Sample records for management performance measures

  1. The Development of A Performance Measurement Concept for the Royal Australian Air Force

    DTIC Science & Technology

    1992-09-01

    knowledge of management accounting and performance measurement techniques. As the RAAF currently has no cost management and performance measurement system...provides a review of the current literature on management accounting for performance measurement, specifically referring to the problems of using...traditional management accounting methodologies as a basis for formulating performance measures. Chapter III explains the methodology used to conduct the

  2. Performance measures for a dialysis setting.

    PubMed

    Gu, Xiuzhu; Itoh, Kenji

    2018-03-01

    This study from Japan extracted performance measures for dialysis unit management and investigated their characteristics from professional views. Two surveys were conducted using self-administered questionnaires, in which dialysis managers/staff were asked to rate the usefulness of 44 performance indicators. A total of 255 managers and 2,097 staff responded. Eight performance measures were elicited from dialysis manager and staff responses: these were safety, operational efficiency, quality of working life, financial effectiveness, employee development, mortality, patient/employee satisfaction and patient-centred health care. These performance measures were almost compatible with those extracted in overall healthcare settings in a previous study. Internal reliability, content and construct validity of the performance measures for the dialysis setting were ensured to some extent. As a general trend, both dialysis managers and staff perceived performance measures as highly useful, especially for safety, mortality, operational efficiency and patient/employee satisfaction, but showed relatively low concerns for patient-centred health care and employee development. However, dialysis managers' usefulness perceptions were significantly higher than staff. Important guidelines for designing a holistic hospital/clinic management system were yielded. Performance measures must be balanced for outcomes and performance shaping factors (PSF); a common set of performance measures could be applied to all the healthcare settings, although performance indicators of each measure should be composed based on the application field and setting; in addition, sound causal relationships between PSF and outcome measures/indicators should be explored for further improvement. © 2017 European Dialysis and Transplant Nurses Association/European Renal Care Association.

  3. 41 CFR 102-117.270 - What are agency performance measures for transportation?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What are agency... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 117-TRANSPORTATION MANAGEMENT Performance Measures § 102-117.270 What are agency performance...

  4. 41 CFR 102-117.270 - What are agency performance measures for transportation?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What are agency... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 117-TRANSPORTATION MANAGEMENT Performance Measures § 102-117.270 What are agency performance...

  5. 41 CFR 102-117.270 - What are agency performance measures for transportation?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What are agency... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 117-TRANSPORTATION MANAGEMENT Performance Measures § 102-117.270 What are agency performance...

  6. 41 CFR 102-117.270 - What are agency performance measures for transportation?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What are agency... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 117-TRANSPORTATION MANAGEMENT Performance Measures § 102-117.270 What are agency performance...

  7. 41 CFR 102-117.270 - What are agency performance measures for transportation?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are agency... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 117-TRANSPORTATION MANAGEMENT Performance Measures § 102-117.270 What are agency performance...

  8. Performance measurement for case management: principles and objectives for developing standard measures.

    PubMed

    Howe, Rufus

    2005-01-01

    Developing standardized performance measurements for case management (CM) has become the holy grail of the field. The Council for Case Management Accountability (CCMA), a leadership committee of the Case Management Society of America (CMSA), has been grappling with the concept since early 2003. This article lays out a theoretical framework for performance measurement and then outlines the progress on a specific initiative begun by CCMA to correlate CM practices with improved outcome measures.

  9. Performance measurement: integrating quality management and activity-based cost management.

    PubMed

    McKeon, T

    1996-04-01

    The development of an activity-based management system provides a framework for developing performance measures integral to quality and cost management. Performance measures that cross operational boundaries and embrace core processes provide a mechanism to evaluate operational results related to strategic intention and internal and external customers. The author discusses this measurement process that allows managers to evaluate where they are and where they want to be, and to set a course of action that closes the gap between the two.

  10. Federal Highway Administration Focus States Initiative : traffic incident management performance measures final report

    DOT National Transportation Integrated Search

    2009-12-01

    The Traffic Incident Management Performance Measures Focus States Initiative (TIM PM FSI) involves 11 States that have defined three traffic incident performance measures (PM) and conducted field tests of two of these measures. The following measures...

  11. 77 FR 51762 - Proposed Information Collection; Comment Request; Economic Surveys for U.S. Commercial Fisheries

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... through primary processing; (2) to analyze the economic performance effects of current management measures; and (3) to analyze the economic performance effects of alternative management measures. The measures... used to track economic performance and to evaluate the economic effects of alternative management...

  12. Access management performance measures for Virginia : a practical approach for public accountability.

    DOT National Transportation Integrated Search

    2010-04-01

    In order to develop performance measures to communicate the effect of Virginias access management program, five : tasks were performed: (1) the appropriate literature was reviewed, (2) a catalog of potential performance measures was : developed, (...

  13. Leadership Strategies of Performance Measures Impacts in Public Sector Management: A National Content Analysis.

    ERIC Educational Resources Information Center

    Kubala, James Joseph

    A quantitative and qualitative study examined three leadership strategies found in performance-based management (human resource, scientific management and political strategies used in public sector management); a framework by which performance measurement (PM) supports leadership strategies; and how the strategies impact PM. It examined leadership…

  14. Road weather management performance measures : a way to measure achievement.

    DOT National Transportation Integrated Search

    2010-04-01

    This flyer describes the Road Weather Management Performance Measures that will help the Road Weather Management Program (RWMP) maximize the use of available road weather information and technologies; expand road weather research and development effo...

  15. Strategic performance management: development of a performance measurement system at the Mayo Clinic.

    PubMed

    Curtright, J W; Stolp-Smith, S C; Edell, E S

    2000-01-01

    Managing and measuring performance become exceedingly complex as healthcare institutions evolve into integrated health systems comprised of hospitals, outpatient clinics and surgery centers, nursing homes, and home health services. Leaders of integrated health systems need to develop a methodology and system that align organizational strategies with performance measurement and management. To meet this end, multiple healthcare organizations embrace the performance-indicators reporting system known as a "balanced scorecard" or a "dashboard report." This discrete set of macrolevel indicators gives senior management a fast but comprehensive glimpse of the organization's performance in meeting its quality, operational, and financial goals. The leadership of outpatient operations for Mayo Clinic in Rochester, Minnesota built on this concept by creating a performance management and measurement system that monitors and reports how well the organization achieves its performance goals. Internal stakeholders identified metrics to measure performance in each key category. Through these metrics, the organization links Mayo Clinic's vision, primary value, core principles, and day-to-day operations by monitoring key performance indicators on a weekly, monthly, or quarterly basis.

  16. Performance indicators: healthcare professionals' views.

    PubMed

    Gu, Xiuzhu; Itoh, Kenji

    2016-08-08

    Purpose - The purpose of this paper is to capture factors behind professional views of indicator usefulness as a common structure for assessing healthcare performance and their important characteristics to design limited key performance indicators (PIs) for holistic hospital management. Design/methodology/approach - Two surveys were conducted using self-administered questionnaires, in which hospital manager/staff respondents were asked to rate the 52 PIs' usefulness. In total, 228 manager and 894 staff responses were collected. Findings - Eight factors were elicited from manager and staff responses as performance measures with 72 percent cumulative variance accounted for. Hospital managers and staff showed similar performance measure perceptions: high-utility acknowledgment on safety, operational efficiency and patient/employee satisfaction but relatively low-employee development concerns. Manager indicator usefulness perceptions were rather homogeneous and significantly higher than staff for almost all performance measures. Practical implications - Homogeneous manager views mean that a single key PI set for hospital management may be established regardless of hospital attributes. The following aspects may be measures that should be managed in a healthcare organization based on their key PIs: patient/employee safety, operational efficiency, financial effectiveness and patient/employee satisfaction. Originality/value - This is a pilot study on hospital management PIs in Japan. The eight-dimensional factor structure and findings about healthcare provider perceptions may be useful for healthcare management.

  17. Proposed Performance Measures and Strategies for Implementation of the Fatigue Risk Management Guidelines for Emergency Medical Services.

    PubMed

    Martin-Gill, Christian; Higgins, J Stephen; Van Dongen, Hans P A; Buysse, Daniel J; Thackery, Ronald W; Kupas, Douglas F; Becker, David S; Dean, Bradley E; Lindbeck, George H; Guyette, Francis X; Penner, Josef H; Violanti, John M; Lang, Eddy S; Patterson, P Daniel

    2018-02-15

    Performance measures are a key component of implementation, dissemination, and evaluation of evidence-based guidelines (EBGs). We developed performance measures for Emergency Medical Services (EMS) stakeholders to enable the implementation of guidelines for fatigue risk management in the EMS setting. Panelists associated with the Fatigue in EMS Project, which was supported by the National Highway Traffic Safety Administration (NHTSA), used an iterative process to develop a draft set of performance measures linked to 5 recommendations for fatigue risk management in EMS. We used a cross-sectional survey design and the Content Validity Index (CVI) to quantify agreement among panelists on the wording and content of draft measures. An anonymous web-based tool was used to solicit the panelists' perceptions of clarity and relevance of draft measures. Panelists rated the clarity and relevance separately for each draft measure on a 4-point scale. CVI scores ≥0.78 for clarity and relevance were specified a priori to signify agreement and completion of measurement development. Panelists judged 5 performance measures for fatigue risk management as clear and relevant. These measures address use of fatigue and/or sleepiness survey instruments, optimal duration of shifts, access to caffeine as a fatigue countermeasure, use of napping during shift work, and the delivery of education and training on fatigue risk management for EMS personnel. Panelists complemented performance measures with suggestions for implementation by EMS agencies. Performance measures for fatigue risk management in the EMS setting will facilitate the implementation and evaluation of the EBG for Fatigue in EMS.

  18. Examining the Perceived Value of Integration of Earned Value Management with Risk Management-Based Performance Measurement Baseline

    ERIC Educational Resources Information Center

    Shah, Akhtar H.

    2014-01-01

    Many projects fail despite the use of evidence-based project management practices such as Performance Measurement Baseline (PMB), Earned Value Management (EVM) and Risk Management (RM). Although previous researchers have found that integrated project management techniques could be more valuable than the same techniques used by themselves, these…

  19. Using FTE and RVU performance measures to assess financial viability of academic nurse-managed centers.

    PubMed

    Vonderheid, Susan; Pohl, Joanne; Schafer, Patricia; Forrest, Kathy; Poole, Michele; Barkauskas, Violet; Mackey, Thomas A

    2004-01-01

    Financial performance measures are essential to improve the fiscal management of academic nurse-managed centers (ANMCs). Measures are compared among six ANMCs in a consortium and against an external, self-sustainable, profitable ANMC and national data for family practice physicians. Performance measures help identify a center's strengths and weaknesses facilitating the development of strategies aimed at a variety of targets (business practices related to revenue and costs) to improve financial viability. Using a variety of financial performance measures to inform decision making will aid ANMCs in keeping their doors open for business.

  20. The balanced scorecard--measures that drive performance.

    PubMed

    Kaplan, R S; Norton, D P

    1992-01-01

    Frustrated by the inadequacies of traditional performance measurement systems, some managers have abandoned financial measures like return on equity and earnings per share. "Make operational improvements and the numbers will follow," the argument goes. But managers do not want to choose between financial and operational measures. Executives want a balanced presentation of measures that allow them to view the company from several perspectives simultaneously. During a year-long research project with 12 companies at the leading edge of performance measurement, the authors developed a "balanced scorecard," a new performance measurement system that gives top managers a fast but comprehensive view of the business. The balanced scorecard includes financial measures that tell the results of actions already taken. And it complements those financial measures with three sets of operational measures having to do with customer satisfaction, internal processes, and the organization's ability to learn and improve--the activities that drive future financial performance. Managers can create a balanced scorecard by translating their company's strategy and mission statements into specific goals and measures. To create the part of the scorecard that focuses on the customer perspective, for example, executives at Electronic Circuits Inc. established general goals for customer performance: get standard products to market sooner, improve customers' time-to-market, become customers' supplier of choice through partnerships, and develop innovative products tailored to customer needs. Managers translated these elements of strategy into four specific goals and identified a measure for each.

  1. 41 CFR 102-192.115 - Why must we use performance measures?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Why must we use performance measures? 102-192.115 Section 102-192.115 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS...

  2. Performance measurement for supply chain management and evaluation criteria determination for reverse supply chain management

    NASA Astrophysics Data System (ADS)

    Kongar, N. Elif

    2004-12-01

    Today, since customers are able to obtain similar-quality products for similar prices, the lead time has become the only preference criterion for most of the consumers. Therefore, it is crucial that the lead time, i.e., the time spent from the raw material phase till the manufactured good reaches the customer, is minimized. This issue can be investigated under the title of Supply Chain Management (SCM). An efficiently managed supply chain can lead to reduced response time for customers. To achieve this, continuous observation of supply chain efficiency, i.e., a constant performance evaluation of the current SCM is required. Widely used conventional performance measurement methods lack the ability to evaluate a SCM since the supply chain is a dynamic system that requires a more thorough and flexible performance measurement technique. Balanced Scorecard (BS) is an efficient tool for measuring the performance of dynamic systems and has a proven capability of providing the decision makers with the appropriate feedback data. In addition to SCM, a relatively new management field, namely reverse supply chain management (RSCM), also necessitates an appropriate evaluation approach. RSCM differs from SCM in many aspects, i.e., the criteria used for evaluation, the high level of uncertainty involved etc., not allowing the usage of identical evaluation techniques used for SCM. This study proposes a generic Balanced Scorecard to measure the performance of supply chain management while defining the appropriate performance measures for SCM. A scorecard prototype, ESCAPE, is presented to demonstrate the evaluation process.

  3. 75 FR 35092 - Submission for Review: Performance Measurement Surveys, OMB Control No. 3206-NEW

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... in shaping human resources management systems to effectively recruit, develop, manage and retain a... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Performance Measurement Surveys, OMB Control No. 3206-NEW AGENCY: U.S. Office of Personnel Management. ACTION: 60-Day notice and request for...

  4. Best practices in selecting performance measures and standards for effective asset management.

    DOT National Transportation Integrated Search

    2011-06-01

    "This report assesses and provides guidance on best practices in performance measurement, management and standards : setting for effective Transportation Asset Management (TAM). The study is conducted through a literature review, a : survey of the 50...

  5. Assessing physical functioning on pain management programmes: the unique contribution of directly assessed physical performance measures and their relationship to self-reports

    PubMed Central

    Guildford, Beth J; Jacobs, Clair M; Daly-Eichenhardt, Aisling; Scott, Whitney; McCracken, Lance M

    2016-01-01

    Physical functioning is a recommended outcome domain for pain management programmes. It can be assessed by self-report and by direct assessment of performance. Although physical performance measures may provide unique and useful information about patient functioning over and above self-report measures, it is not entirely clear which of the many possible performances to assess. This study investigated a battery of three directly assessed physical performance measures and their relationship to three currently used self-report measures of general health and functioning. The three performance measures were sensitive to treatment; patients performed significantly better on all three measures following completion of the pain management programme. The three performance measures were shown to represent a single underlying dimension, and there was a significant degree of overlap between them. The performance measures were shown to be relevant in explaining variation in the self-report measures, as well as to offer a clinically relevant different dimension of assessment to self-report. Future research could focus on developing performance-based measures that capture quality of movement and that are sensitive to relevant processes of therapeutic change. PMID:28386404

  6. Performance measurement: A tool for program control

    NASA Technical Reports Server (NTRS)

    Abell, Nancy

    1994-01-01

    Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.

  7. An Ethnostatistical Analysis of Performance Measurement

    ERIC Educational Resources Information Center

    Winiecki, Donald J.

    2008-01-01

    Within the fields of human performance technology (HPT), human resources management (HRM), and management in general, performance measurement is not only foundational but considered necessary at all phases in the process of HPT. In HPT in particular, there is substantial advice literature on what measurement is, why it is essential, and (at a…

  8. Do senior management cultures affect performance? Evidence from Italian public healthcare organizations.

    PubMed

    Prenestini, Anna; Lega, Federico

    2013-01-01

    Healthcare organizations are often characterized by diffuse power, ambiguous goals, and a plurality of actors. In this complex and pluralistic context, senior healthcare managers are expected to provide strategic direction and lead their organizations toward their goals and performance targets. The present work explores the relationship between senior management team culture and performance by investigating Italian public healthcare organizations in the Tuscany region. Our assessment of senior management culture was accomplished through the use of an established framework and a corresponding tool, the competing values framework, which supports the idea that specific aspects of performance are related to a dominant management culture. Organizational performance was assessed using a wide range of measures collected by a multidimensional performance evaluation system, which was developed in Tuscany to measure the performance of its 12 local health authorities (LHAs) and four teaching hospitals (THs). Usable responses were received from 80 senior managers of 11 different healthcare organizations (two THs and nine LHAs). Our findings show that Tuscan healthcare organizations are characterized by various dominant cultures: developmental, clan, rational, and hierarchical. These variations in dominant culture were associated with performance measures. The implications for management theory, professional practice, and public policy are discussed.

  9. Development of Performance Dashboards in Healthcare Sector: Key Practical Issues.

    PubMed

    Ghazisaeidi, Marjan; Safdari, Reza; Torabi, Mashallah; Mirzaee, Mahboobeh; Farzi, Jebraeil; Goodini, Azadeh

    2015-10-01

    Static nature of performance reporting systems in health care sector has resulted in inconsistent, incomparable, time consuming, and static performance reports that are not able to transparently reflect a round picture of performance and effectively support healthcare managers' decision makings. So, the healthcare sector needs interactive performance management tools such as performance dashboards to measure, monitor, and manage performance more effectively. The aim of this article was to identify key issues that need to be addressed for developing high-quality performance dashboards in healthcare sector. A literature review was established to search electronic research databases, e-journals collections, and printed journals, books, dissertations, and theses for relevant articles. The search strategy interchangeably used the terms of "dashboard", "performance measurement system", and "executive information system" with the term of "design" combined with operator "AND". Search results (n=250) were adjusted for duplications, screened based on their abstract relevancy and full-text availability (n=147) and then assessed for eligibility (n=40). Eligible articles were included if they had explicitly focused on dashboards, performance measurement systems or executive information systems design. Finally, 28 relevant articles included in the study. Creating high-quality performance dashboards requires addressing both performance measurement and executive information systems design issues. Covering these two fields, identified contents were categorized to four main domains: KPIs development, Data Sources and data generation, Integration of dashboards to source systems, and Information presentation issues. This study implies the main steps to develop dashboards for the purpose of performance management. Performance dashboards developed on performance measurement and executive information systems principles and supported by proper back-end infrastructure will result in creation of dynamic reports that help healthcare managers to consistently measure the performance, continuously detect outliers, deeply analyze causes of poor performance, and effectively plan for the future.

  10. Everyday Functioning in Huntington's Disease: A Laboratory-Based Study of Financial Management Capacity.

    PubMed

    Sheppard, David P; Pirogovsky-Turk, Eva; Woods, Steven Paul; Holden, Heather M; Nicoll, Diane R; Filoteo, J Vincent; Corey-Bloom, Jody; Gilbert, Paul E

    2017-01-01

    One important limitation of prior studies examining functional decline in Huntington's disease (HD) has been the reliance on self-reported measures of ability. Since report-based methods can be biased by lack of insight, depression, and cognitive impairment, contrasting self-reported ability with measures that assess capacity may lead to a more comprehensive estimation of real-world functioning. The present study examined self-reported ability to perform instrumental activities of daily living (iADLs) and performance-based financial management capacity in 20 patients diagnosed with mild-moderate Huntington's disease (HD) and 20 demographically similar healthy adults. HD patients reported significantly greater declines in their ability to manage finances. On the capacity measure of financial management, HD patients performed significantly below healthy adults. Additionally, in the HD group there were no significant correlations between self-reported ability and capacity measures of financial management. HD patients endorsed declines in global iADL ability and exhibited deficits in functional capacity when performing a financial management task. Capacity measures may aid in assessing the extent to which HD patients accurately estimate real-world iADL performance, and the present findings suggest that such measures of capacity may be related to the cognitive, but not motor or affective, symptoms of HD.

  11. Examining financial performance indicators for acute care hospitals.

    PubMed

    Burkhardt, Jeffrey H; Wheeler, John R C

    2013-01-01

    Measuring financial performance in acute care hospitals is a challenge for those who work daily with financial information. Because of the many ways to measure financial performance, financial managers and researchers must decide which measures are most appropriate. The difficulty is compounded for the non-finance person. The purpose of this article is to clarify key financial concepts and describe the most common measures of financial performance so that researchers and managers alike may understand what is being measured by various financial ratios.

  12. Vital signs: taking the pulse of your managed care contract performance.

    PubMed

    Waymack, Pamela M; Ward, William J

    2005-07-01

    Three essential baseline measures of managed care performance that should be reported on a regular basis are: Overall profitability of the organization's managed care portfolio. Payer mix and profitability. Performance of major managed care contracts.

  13. 41 CFR 102-192.110 - At what level(s) in our agency must we have performance measures?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false At what level(s) in our agency must we have performance measures? 102-192.110 Section 102-192.110 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...

  14. Business Performance Measurements in Asset Management with the Support of Big Data Technologies

    NASA Astrophysics Data System (ADS)

    Campos, Jaime; Sharma, Pankaj; Jantunen, Erkki; Baglee, David; Fumagalli, Luca

    2017-09-01

    The paper reviews the performance measurement in the domain of interest. Important data in asset management are further, discussed. The importance and the characteristics of today's ICTs capabilities are also mentioned in the paper. The role of new concepts such as big data and data mining analytical technologies in managing the performance measurements in asset management are discussed in detail. The authors consequently suggest the use of the modified Balanced Scorecard methodology highlighting both quantitative and qualitative aspects, which is crucial for optimal use of the big data approach and technologies.

  15. Mission possible? The performance of prosocially motivated employees depends on manager trustworthiness.

    PubMed

    Grant, Adam M; Sumanth, John J

    2009-07-01

    The authors propose that in mission-driven organizations, prosocially motivated employees are more likely to perform effectively when trust cues enhance their perceptions of task significance. The authors develop and test a model linking prosocial motivation, trust cues, task significance, and performance across 3 studies of fundraisers using 3 different objective performance measures. In Study 1, perceiving managers as trustworthy strengthened the relationship between employees' prosocial motivation and performance, measured in terms of calls made. This moderated relationship was mediated by employees' perceptions of task significance. Study 2 replicated the interaction of manager trustworthiness and prosocial motivation in predicting a new measure of performance: dollars raised. It also revealed 3-way interactions between prosocial motivation, manager trustworthiness, and dispositional trust propensity, such that high trust propensity compensated for low manager trustworthiness to strengthen the association between employees' prosocial motivation and performance. Study 3 replicated all of the previous mediation and moderation findings in predicting initiative taken by professional fundraisers. Implications for work motivation, work design, and trust in organizations are discussed.

  16. Predictors of performance-based measures of instrumental activities of daily living in nondemented patients with Parkinson's disease.

    PubMed

    Pirogovsky, Eva; Martinez-Hannon, Mercedes; Schiehser, Dawn M; Lessig, Stephanie L; Song, David D; Litvan, Irene; Filoteo, J Vincent

    2013-01-01

    Few studies have examined instrumental activities of daily living (iADLs) in nondemented Parkinson's disease (PD), and the majority of these studies have used report-based measures, which can have limited validity. The present study had two main goals: (a) to examine the performance of nondemented PD patients on two performance-based measures of iADLs, which are considered more objective functional measures, and (b) to examine the cognitive, motor, and psychiatric correlates of iADL impairment in PD. Ninety-eight nondemented PD patients and 47 healthy older adults were administered performance-based measures that assess the ability to manage medications (Medication Management Ability Assessment) and finances (University of California, San Diego, UCSD, Performance-based Skills Assessment), the Mattis Dementia Rating Scale to assess global cognitive functioning, the Unified Parkinson's Disease Rating Scale Part III to assess motor symptom severity, and the Geriatric Depression Scale to assess depressive symptoms. Nondemented PD patients demonstrated significantly impaired scores relative to the healthy comparison group on the performance-based measure of financial management, but there were no significant group differences in medication management. Global cognitive functioning, motor severity, and depressive symptoms did not correlate with scores on either of the functional measures, except for a small correlation between depressive symptoms and financial management. The two performance-based measures of iADL functioning did not correlate with one another. These findings suggest that medication and financial management may not be predicted based on global cognitive functioning and that iADLs may not be represented by a single construct. Furthermore, these findings suggest the potential need for a multidimensional approach to assessing iADLs.

  17. A New Approach of Measuring Hospital Performance for Low- and Middle-income Countries

    PubMed Central

    Sapkota, Vishnu Prasad; Supakankunti, Siripen

    2015-01-01

    Efficiency of the hospitals affects the price of health services. Health care payments have equity implications. Evidence on hospital performance can support to design the policy; however, the recent literature on hospital efficiency produced conflicting results. Consequently, policy decisions are uncertain. Even the most of evidence were produced by using data from high income countries. Conflicting results were produced particularly due to differences in methods of measuring performance. Recently a management approach has been developed to measure the hospital performance. This approach to measure the hospital performance is very useful from policy perspective to improve health system from cost-effective way in low and middle income countries. Measuring hospital performance through management approach has some basic characteristics such as scoring management practices through double blind survey, measuring hospital outputs using various indicators, estimating the relationship between management practices and outputs of the hospitals. This approach has been successfully applied to developed countries; however, some revisions are required without violating the fundamental principle of this approach to replicate in low- and middle-income countries. The process has been clearly defined and applied to Nepal. As the results of this, the approach produced expected results. The paper contributes to improve the approach to measure hospital performance. PMID:26617448

  18. Exercise Performance Measurement with Smartphone Embedded Sensor for Well-Being Management

    PubMed Central

    Liu, Chung-Tse; Chan, Chia-Tai

    2016-01-01

    Regular physical activity reduces the risk of many diseases and improves physical and mental health. However, physical inactivity is widespread globally. Improving physical activity levels is a global concern in well-being management. Exercise performance measurement systems have the potential to improve physical activity by providing feedback and motivation to users. We propose an exercise performance measurement system for well-being management that is based on the accumulated activity effective index (AAEI) and incorporates a smartphone-embedded sensor. The proposed system generates a numeric index that is based on users’ exercise performance: their level of physical activity and number of days spent exercising. The AAEI presents a clear number that can serve as a useful feedback and goal-setting tool. We implemented the exercise performance measurement system by using a smartphone and conducted experiments to assess the feasibility of the system and investigated the user experience. We recruited 17 participants for validating the feasibility of the measurement system and a total of 35 participants for investigating the user experience. The exercise performance measurement system showed an overall precision of 88% in activity level estimation. Users provided positive feedback about their experience with the exercise performance measurement system. The proposed system is feasible and has a positive effective on well-being management. PMID:27727188

  19. Exercise Performance Measurement with Smartphone Embedded Sensor for Well-Being Management.

    PubMed

    Liu, Chung-Tse; Chan, Chia-Tai

    2016-10-11

    Regular physical activity reduces the risk of many diseases and improves physical and mental health. However, physical inactivity is widespread globally. Improving physical activity levels is a global concern in well-being management. Exercise performance measurement systems have the potential to improve physical activity by providing feedback and motivation to users. We propose an exercise performance measurement system for well-being management that is based on the accumulated activity effective index (AAEI) and incorporates a smartphone-embedded sensor. The proposed system generates a numeric index that is based on users' exercise performance: their level of physical activity and number of days spent exercising. The AAEI presents a clear number that can serve as a useful feedback and goal-setting tool. We implemented the exercise performance measurement system by using a smartphone and conducted experiments to assess the feasibility of the system and investigated the user experience. We recruited 17 participants for validating the feasibility of the measurement system and a total of 35 participants for investigating the user experience. The exercise performance measurement system showed an overall precision of 88% in activity level estimation. Users provided positive feedback about their experience with the exercise performance measurement system. The proposed system is feasible and has a positive effective on well-being management.

  20. Managing for Results--Linking Performance Measures and Budgets.

    ERIC Educational Resources Information Center

    McGee, William L.; Fountain, James R., Jr.

    1995-01-01

    The Government Accounting Standards Board notion of service efforts and accomplishments reporting is one step in a process of managing for results that includes strategic planning, development and use of performance measures of managing ongoing programs, and outputs to budgetary appropriation. Reports a trial application to one school district.…

  1. The Exposure Index: Developing firefighter safety performance measures

    Treesearch

    Dave Calkin; John Phipps; Tom Holmes; Jon Rieck; Matt Thompson

    2011-01-01

    A cornerstone of effective institutional learning and accountability is the development, tracking, and analysis of informative performance measures. In a previous issue of Fire Management Today ("A New Look at Risk Management," Winter 2011), a series of articles highlighted the importance of organizational safety and risk management and the challenges of...

  2. Identification of Commercial Items Risk Factors

    DTIC Science & Technology

    2003-03-01

    performance measures, vendors availability of support, testing and managing organizational change . 1. Process Risk Factor: Commercial Standards Military...support, testing and managing organizational change . C. ASSESSING RESULTS Completing the questions and assessing/compiling the results should help...to performance measures, vendors availability of support, testing and managing organizational change . SECTION I Service

  3. 78 FR 78416 - Submission for Review: Performance Measurement Surveys, OMB Control No. 3206-0253

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... INFORMATION: The Office of Personnel Management (OPM) leads Federal agencies in shaping human resources... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Performance Measurement Surveys, OMB Control No. 3206-0253 AGENCY: U.S. Office of Personnel Management. ACTION: 60-Day Notice and request for...

  4. Facts and Fables of Performance Management in the 21st Century.

    ERIC Educational Resources Information Center

    Wingrove, Clinton

    2002-01-01

    Discusses performance management which links the strategic partnership between human resources and line management and enterprise direction. Considers the challenges in measuring an individual's success within an organization and explains 11 different processes that comprise performance management. (Author/LRW)

  5. Developing performance measures for alcohol and other drug services in managed care plans. Washington Circle Group.

    PubMed

    McCorry, F; Garnick, D W; Bartlett, J; Cotter, F; Chalk, M

    2000-11-01

    Monitoring the quality and availability of alcohol and other drug (AOD) services must be a central tenet of any health-related performance measurement system. The Washington Circle Group (WCG), which was convened by the Center for Substance Abuse Treatment Office of Managed Care in March 1998, has developed a core set of performance measures for AOD services for public- and private-sector health plans. It is also collaborating with a broad range of stakeholders to ensure widespread adoption of these performance measures by health plans, private employers, public payers, and accrediting organizations. Four domains were identified, with specific measures developed for each domain: (1) prevention/education, (2) recognition, (3) treatment (including initiation of alcohol and other plan services, linkage of detoxification and AOD plan services, treatment engagement, and interventions for family members/significant others), and (4) maintenance of treatment effects. Four measures that are based on administrative information from health plans and two measures that require a consumer survey of behavioral health care are undergoing extensive pilot testing. The WCG has reached out to a broad range of stakeholders in performance measurement and managed care to acquaint them with the measures and to promote their investigation and adoption. As results of pilot testing become available, these outreach efforts will continue. Performance measures for AOD services need to become an integral part of a comprehensive set of behavioral and physical health performance measures for managed care plans.

  6. Adaptive self-regulation: meeting others' expectations of leadership and performance.

    PubMed

    Sosik, John J; Potosky, Denise; Jung, Dong I

    2002-04-01

    The authors used longitudinal multisource field data to examine core aspects of the adaptive self-regulation model (A. S. Tsui & S. J. Ashford, 1994) in terms of linkages between self-monitoring, discrepancy in manager match-to-position, 5 measures of leadership, and manager performance. At Time 1, 64 superiors of focal managers rated the managers' matches to their positions within the organization; at Time 3, they rated the managers' performance. At Time 2, the 64 focal managers completed a measure of self-monitoring, and 192 subordinates rated the focal managers' leadership behaviors. Results of partial least squares analysis revealed that discrepancy in manager match-to-position was associated with reductions in laissez faire and passive management-by-exception behaviors and increases in transformational leadership behavior. Self-monitoring was positively associated with all 5 leadership behaviors. Performance was related positively to transformational leadership behavior and negatively to passive management-by-exception and contingent-reward behaviors

  7. Strategic Measures of Teacher Performance

    ERIC Educational Resources Information Center

    Milanowski, Anthony

    2011-01-01

    Managing the human capital in education requires measuring teacher performance. To measure performance, administrators need to combine measures of practice with measures of outcomes, such as value-added measures, and three measurement systems are needed: classroom observations, performance assessments or work samples, and classroom walkthroughs.…

  8. Operations-oriented performance measures for freeway management systems : final report.

    DOT National Transportation Integrated Search

    2008-12-01

    This report describes the second and final year activities of the project titled Using Operations-Oriented Performance Measures to Support Freeway Management Systems. Work activities included developing a prototype system architecture for testi...

  9. Data Envelopment Analysis (DEA) Model in Operation Management

    NASA Astrophysics Data System (ADS)

    Malik, Meilisa; Efendi, Syahril; Zarlis, Muhammad

    2018-01-01

    Quality management is an effective system in operation management to develops, maintains, and improves quality from groups of companies that allow marketing, production, and service at the most economycal level as well as ensuring customer satisfication. Many companies are practicing quality management to improve their bussiness performance. One of performance measurement is through measurement of efficiency. One of the tools can be used to assess efficiency of companies performance is Data Envelopment Analysis (DEA). The aim of this paper is using Data Envelopment Analysis (DEA) model to assess efficiency of quality management. In this paper will be explained CCR, BCC, and SBM models to assess efficiency of quality management.

  10. An Integrated Approach Is Needed for Ecosystem Based Fisheries Management: Insights from Ecosystem-Level Management Strategy Evaluation

    PubMed Central

    Fulton, Elizabeth A.; Smith, Anthony D. M.; Smith, David C.; Johnson, Penelope

    2014-01-01

    An ecosystem approach is widely seen as a desirable goal for fisheries management but there is little consensus on what strategies or measures are needed to achieve it. Management strategy evaluation (MSE) is a tool that has been widely used to develop and test single species fisheries management strategies and is now being extended to support ecosystem based fisheries management (EBFM). We describe the application of MSE to investigate alternative strategies for achieving EBFM goals for a complex multispecies fishery in southeastern Australia. The study was undertaken as part of a stakeholder driven process to review and improve the ecological, economic and social performance of the fishery. An integrated management strategy, involving combinations of measures including quotas, gear controls and spatial management, performed best against a wide range of objectives and this strategy was subsequently adopted in the fishery, leading to marked improvements in performance. Although particular to one fishery, the conclusion that an integrated package of measures outperforms single focus measures we argue is likely to apply widely in fisheries that aim to achieve EBFM goals. PMID:24454722

  11. A concept for performance management for Federal science programs

    USGS Publications Warehouse

    Whalen, Kevin G.

    2017-11-06

    The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.

  12. Measuring Organizational Learning Capability in Indian Managers and Establishing Firm Performance Linkage: An Empirical Analysis

    ERIC Educational Resources Information Center

    Bhatnagar, Jyotsna

    2006-01-01

    Purpose: The purpose of this research is to measure Organizational Learning Capability (OLC) perception in the managers of public, private and multinational organizations and establish the link between OLC and firm performance. Design/methodology/approach: The data were collected from a sample of 612 managers randomly drawn from Indian industry,…

  13. Transportation management center data capture for performance and mobility measures guidebook.

    DOT National Transportation Integrated Search

    2013-03-01

    The Guide to Transportation Management Center (TMC) Data Capture for Performance and Mobility Measures is a two-volume document consisting of this summary Guidebook and a Reference Manual. These documents provide technical guidance and recommended pr...

  14. Performance analysis of Supply Chain Management with Supply Chain Operation reference model

    NASA Astrophysics Data System (ADS)

    Hasibuan, Abdurrozzaq; Arfah, Mahrani; Parinduri, Luthfi; Hernawati, Tri; Suliawati; Harahap, Bonar; Rahmah Sibuea, Siti; Krianto Sulaiman, Oris; purwadi, Adi

    2018-04-01

    This research was conducted at PT. Shamrock Manufacturing Corpora, the company is required to think creatively to implement competition strategy by producing goods/services that are more qualified, cheaper. Therefore, it is necessary to measure the performance of Supply Chain Management in order to improve the competitiveness. Therefore, the company is required to optimize its production output to meet the export quality standard. This research begins with the creation of initial dimensions based on Supply Chain Management process, ie Plan, Source, Make, Delivery, and Return with hierarchy based on Supply Chain Reference Operation that is Reliability, Responsiveness, Agility, Cost, and Asset. Key Performance Indicator identification becomes a benchmark in performance measurement whereas Snorm De Boer normalization serves to equalize Key Performance Indicator value. Analiytical Hierarchy Process is done to assist in determining priority criteria. Measurement of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora produces SC. Responsiveness (0.649) has higher weight (priority) than other alternatives. The result of performance analysis using Supply Chain Reference Operation model of Supply Chain Management performance at PT. Shamrock Manufacturing Corpora looks good because its monitoring system between 50-100 is good.

  15. Measuring the Effect of Management on Performance: A Modern Biblical Paradigm

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Corcoran, W.R.

    1999-11-14

    The ability to measure the effect of management on performance enables higher management and regulators to prescribe measures to ensure that actual management practices are compatible with results important to stakeholders. The principal stakeholders of higher management are the owners, and the principal stakeholders of the regulators are the public. Extended shutdowns and confirmatory action letters over the past decade or so at Cook, Millstone, Zion, Haddam Neck, Clinton, South Texas, Calvert Cliffs, Pilgrim, and other stations strongly suggest that neither higher management nor regulators have a firm grasp of the measurement of the effect of management on performance. Effortsmore » in the past have focused on attributes of effective management rather than data. For example, the U.S. Nuclear Regulatory Commission uses Appendix B, and the Institute of Nuclear Power Operations uses its ''Excellence in Human Performance'' among other guidance. In both cases, assessment focuses on the observation of what is going on in an organization and comparing it with the criteria. In this paper, the emphasis is on data, not attributes. The data of concern here are results (consequences, events, precursors). The biblical paradigm is that a good tree bears good fruit. It does not take a botanist to tell that the apples are firm and tasty. ''Not everything that counts can be counted, and not everything that can be counted counts'' is a popular defense of attribute-driven assessment. The validity of attribute-driven assessment is not disputed, but this paper explores data-driven assessment that is becoming more practical as information technology advances rapidly. This paper does not address a complete management effect measurement system but only explores one aspect of such a system. The aspect chosen is regulatory violation performance.« less

  16. Management-by-Results and Performance Measurement in Universities--Implications for Work Motivation

    ERIC Educational Resources Information Center

    Kallio, Kirsi-Mari; Kallio, Tomi J.

    2014-01-01

    The article focuses on the effects of management-by-results from the perspective of the work motivation of university employees. The study is based on extensive survey data among employees at Finnish universities. According to the results, performance measurement is based on quantitative rather than qualitative measures, and the current…

  17. Transportation management center data capture for performance and mobility measures reference manual.

    DOT National Transportation Integrated Search

    2013-03-01

    The Guide to Transportation Management Center (TMC) Data Capture for Performance and Mobility Measures is a two-volume document consisting of a summary Guidebook and this Reference Manual. These documents provide technical guidance and recommended pr...

  18. Prospective Memory Deficits Are Associated With Poorer Everyday Functioning in Parkinson’s Disease

    PubMed Central

    Pirogovsky, Eva; Woods, Steven Paul; Filoteo, J. Vincent; Gilbert, Paul E.

    2013-01-01

    Although individuals with Parkinson’s disease (PD) evidence moderate deficits in prospective memory (PM), it is not known whether PM deficits confer an increased risk of poorer everyday functioning. In the current study, 33 individuals with PD and 26 demographically similar normal controls (NC) were administered performance-based and self-report measures of PM and everyday functioning, including medication and financial management. As compared to NC, PD participants demonstrated significantly lower scores on performance-based measures of PM and financial capacity, worse performance at a trend level on performance-based medication management and endorsed significantly greater self-reported declines in PM and instrumental activities of daily living (iADLs). In the PD sample, the laboratory measure of PM significantly correlated with performance-based measures of financial capacity and medication management and a self-report measure of medication management. Self-reported PM failures significantly correlated with perceived declines in iADLs, worse medication management, and poorer health-related quality of life. Although future studies are needed to examine the incremental ecological validity of PM in PD, findings from this study extend prior research by providing preliminary evidence that PM impairment may play a significant role in a range of critical everyday functions in PD. PMID:22846463

  19. Development of access management performance measures.

    DOT National Transportation Integrated Search

    2009-05-01

    In 2007, the Virginia General Assembly passed legislation calling for Access Management, the : regulation of entrances and intersections along highway corridors in Virginia. Some property owners may oppose : access management. Therefore, performance ...

  20. Flight performance measurement utilizing a figure of merit (FOM)

    NASA Technical Reports Server (NTRS)

    Mosier, Kathleen L.; Zacharias, Greg L.

    1993-01-01

    One of the goals of the NASA Strategic Behavior/Workload Management Program is to develop standardized procedures for constructing figures of merit (FOMs) that describe minimal criteria for flight task performance, as well as summarize overall performance quality. Such a measure could be utilized for evaluating flight crew performance, for assessing the effectiveness of new equipment or technological innovations, or for measuring performance at a particular airport. In this report, we describe the initial phases in the creation of a FOM to be employed in examining crew performance in NASA-Ames Air Ground Compatibility and Strategic Behavior/Workload Management programs.

  1. 76 FR 70653 - Performance Measurement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... Regulations as follows: PART 3055--SERVICE PERFORMANCE AND CUSTOMER SATISFACTION REPORTING 0 1. The authority... entered into the National Customer Management System (NCMS). NCMS manages SFS inventory, general ledger, order history, and customer accounts. A measurement ends when the order is logically closed out in the...

  2. Performance measures for public transit mobility management.

    DOT National Transportation Integrated Search

    2011-12-01

    "Mobility management is an innovative approach for managing and delivering coordinated public : transportation services that embraces the full family of public transit options. At a national level, there are : currently no industry recognized perform...

  3. Preferences of Training Performance Measurement: A Comparative Study of Training Professionals and Non-Training Managers

    ERIC Educational Resources Information Center

    Chapman, Diane D.

    2004-01-01

    This survey-based study addressed a perceived gap between training performance evaluation practice and decision-making criteria required in business. Training professionals and non-training managers in North Carolina were surveyed. The study found that the groups differ in the performance measures that motivate them to act on training issues.…

  4. Nonstructural urban stormwater quality measures: building a knowledge base to improve their use.

    PubMed

    Taylor, André C; Fletcher, Tim D

    2007-05-01

    This article summarizes a research project that investigated the use, performance, cost, and evaluation of nonstructural measures to improve urban stormwater quality. A survey of urban stormwater managers from Australia, New Zealand, and the United States revealed a widespread trend of increasing use of nonstructural measures among leading stormwater management agencies, with at least 76% of 41 types of nonstructural measures being found to be increasing in use. Data gathered from the survey, an international literature review, and a multicriteria analysis highlighted four nonstructural measures of greatest potential value: mandatory town planning controls that promote the adoption of low-impact development principles and techniques; development of strategic urban stormwater management plans for a city, shire, or catchment; stormwater management measures and programs for construction/building sites; and stormwater management activities related to municipal maintenance operations such as maintenance of the stormwater drainage network and manual litter collections. Knowledge gained on the use and performance of nonstructural measures from the survey, literature review, and three trial evaluation projects was used to develop tailored monitoring and evaluation guidelines for these types of measure. These guidelines incorporate a new evaluation framework based on seven alternative styles of evaluation that range from simply monitoring whether a nonstructural measure has been fully implemented to monitoring its impact on waterway health. This research helps to build the stormwater management industry's knowledge base concerning nonstructural measures and provides a practical tool to address common impediments associated with monitoring and evaluating the performance and cost of these measures.

  5. USING BIOASSAYS TO EVALUATE THE PERFORMANCE OF EDC RISK MANAGEMENT METHODS

    EPA Science Inventory

    In Superfund risk management research, the performance of risk management techniques is typically evaluated by measuring "the concentrations of the chemicals of concern before and after risk management efforts. However, using bioassays and chemical data provides a more robust und...

  6. Implementing a Nurse Manager Profile to Improve Unit Performance.

    PubMed

    Krugman, Mary E; Sanders, Carolyn L

    2016-06-01

    Nurse managers face significant pressures in the rapidly changing healthcare environment. Staying current with multiple sources of data, including reports that detail institutional and unit performance outcomes, is particularly challenging. A Nurse Manager Customized Profile was developed at a western academic hospital to provide a 1-page visual of pertinent data to help managers and director supervisors focus coaching to improve unit performance. Use of the Decisional Involvement Scale provided new insights into measuring manager performance.

  7. Performance-based contracting in home-care work in The Netherlands: professionalism under pressure?

    PubMed

    Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie

    2016-07-01

    Our aim was to improve the understanding of the relationships between performance-based contracting, management supportiveness and professionalism in home care. Using path analysis, this article explores the relationships between home-care workers' perceptions of management support, implementation of performance-based contracting (i.e. use of strict time registration rules and cost-efficiency measures) and autonomy and intrinsic job satisfaction. We hypothesised that: use of strict time registration rules and cost-efficiency measures relates to lower levels of autonomy and intrinsic job satisfaction (H1); there is an indirect relationship between use of strict time registration rules and use of cost-efficiency measures and intrinsic job satisfaction via autonomy (H2); higher levels of management support relate to the use of looser time registration rules and less use of cost-efficiency measures (H3); and higher levels of management support relate to higher levels of autonomy and intrinsic job satisfaction (H4). We used data from a cross-sectional survey conducted in 2010 of a sample of Dutch home-care workers (N = 156, response rate = 34%). Overall, our study suggests that the consequences of performance-based contracting for professionalism are ambiguous. More specifically, using strict time registration rules is related to lower levels of autonomy, whereas using cost-efficiency measures does not seem to affect autonomy (H1). Performance-based contracting has no consequences for the level of fulfilment home-care workers find in their job, as neither of the two contracting dimensions measured was directly or indirectly related to intrinsic job satisfaction (H1, H2). The role of managers must be taken into account when studying performance-based contracting, because perceived higher management support is related to managers' less frequent use of both strict time registration rules and of cost-efficiency measures (H3). The insight we gained into the importance of supportive managers for both autonomy and job satisfaction (H4) can help home-care organisations improve the attractiveness of home-care work. © 2015 John Wiley & Sons Ltd.

  8. Crew workload-management strategies - A critical factor in system performance

    NASA Technical Reports Server (NTRS)

    Hart, Sandra G.

    1989-01-01

    This paper reviews the philosophy and goals of the NASA/USAF Strategic Behavior/Workload Management Program. The philosophical foundation of the program is based on the assumption that an improved understanding of pilot strategies will clarify the complex and inconsistent relationships observed among objective task demands and measures of system performance and pilot workload. The goals are to: (1) develop operationally relevant figures of merit for performance, (2) quantify the effects of strategic behaviors on system performance and pilot workload, (3) identify evaluation criteria for workload measures, and (4) develop methods of improving pilots' abilities to manage workload extremes.

  9. Health-care process improvement decisions: a systems perspective.

    PubMed

    Walley, Paul; Silvester, Kate; Mountford, Shaun

    2006-01-01

    The paper seeks to investigate decision-making processes within hospital improvement activity, to understand how performance measurement systems influence decisions and potentially lead to unsuccessful or unsustainable process changes. A longitudinal study over a 33-month period investigates key events, decisions and outcomes at one medium-sized hospital in the UK. Process improvement events are monitored using process control methods and by direct observation. The authors took a systems perspective of the health-care processes, ensuring that the impacts of decisions across the health-care supply chain were appropriately interpreted. The research uncovers the ways in which measurement systems disguise failed decisions and encourage managers to take a low-risk approach of "symptomatic relief" when trying to improve performance metrics. This prevents many managers from trying higher risk, sustainable process improvement changes. The behaviour of the health-care system is not understood by many managers and this leads to poor analysis of problem situations. Measurement using time-series methodologies, such as statistical process control are vital for a better understanding of the systems impact of changes. Senior managers must also be aware of the behavioural influence of similar performance measurement systems that discourage sustainable improvement. There is a risk that such experiences will tarnish the reputation of performance management as a discipline. Recommends process control measures as a way of creating an organization memory of how decisions affect performance--something that is currently lacking.

  10. Investigations on optimization of accident management measures following a station blackout accident in a VVER-1000 pressurized water reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tusheva, P.; Schaefer, F.; Kliem, S.

    2012-07-01

    The reactor safety issues are of primary importance for preserving the health of the population and ensuring no release of radioactivity and fission products into the environment. A part of the nuclear research focuses on improvement of the safety of existing nuclear power plants. Studies, research and efforts are a continuing process at improving the safety and reliability of existing and newly developed nuclear power plants at prevention of a core melt accident. Station blackout (loss of AC power supply) is one of the dominant accidents taken into consideration at performing accident analysis. In case of multiple failures of safetymore » systems it leads to a severe accident. To prevent an accident to turn into a severe one or to mitigate the consequences, accident management measures must be performed. The present paper outlines possibilities for application and optimization of accident management measures following a station blackout accident. Assessed is the behaviour of the nuclear power plant during a station blackout accident without accident management measures and with application of primary/secondary side oriented accident management measures. Discussed are the possibilities for operators ' intervention and the influence of the performed accident management measures on the course of the accident. Special attention has been paid to the effectiveness of the passive feeding and physical phenomena having an influence on the system behaviour. The performed simulations show that the effectiveness of the secondary side feeding procedure can be limited due to an early evaporation or flashing effects in the feed water system. The analyzed cases show that the effectiveness of the accident management measures strongly depends on the initiation criteria applied for depressurization of the reactor coolant system. (authors)« less

  11. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    NASA Astrophysics Data System (ADS)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  12. Self-regulation workshop and Occupational Performance Coaching with teachers: A pilot study.

    PubMed

    Hui, Caroline; Snider, Laurie; Couture, Mélanie

    2016-04-01

    Teachers' occupational role and performance can be undermined when working with students with disruptive classroom behaviours. This pilot study aimed to explore the impact of school-based occupational therapy intervention on teachers' classroom management self-efficacy and perceived performance/satisfaction in their management of students with disruptive behaviours. This pilot study used a multiple-case replication study design. A cohort of regular classroom elementary school teachers (n = 11) participated in a 1-day workshop on sensorimotor strategies for supporting student self-regulation followed by eight individual sessions of Occupational Performance Coaching (OPC). Measurement tools were the Canadian Occupational Performance Measure, Goal Attainment Scaling (GAS), and Teachers' Self-Efficacy Scale-Classroom Management. Improvement in teachers' perception of performance, satisfaction, and classroom management was seen. GAS showed clinically significant improvement. Improvements were sustained at 7 weeks follow-up. Preliminary results support the use of sensorimotor education combined with OPC to enable teachers' occupational performance. © CAOT 2016.

  13. Development of Performance Dashboards in Healthcare Sector: Key Practical Issues

    PubMed Central

    Ghazisaeidi, Marjan; Safdari, Reza; Torabi, Mashallah; Mirzaee, Mahboobeh; Farzi, Jebraeil; Goodini, Azadeh

    2015-01-01

    Background: Static nature of performance reporting systems in health care sector has resulted in inconsistent, incomparable, time consuming, and static performance reports that are not able to transparently reflect a round picture of performance and effectively support healthcare managers’ decision makings. So, the healthcare sector needs interactive performance management tools such as performance dashboards to measure, monitor, and manage performance more effectively. The aim of this article was to identify key issues that need to be addressed for developing high-quality performance dashboards in healthcare sector. Methods: A literature review was established to search electronic research databases, e-journals collections, and printed journals, books, dissertations, and theses for relevant articles. The search strategy interchangeably used the terms of “dashboard”, “performance measurement system”, and “executive information system” with the term of “design” combined with operator “AND”. Search results (n=250) were adjusted for duplications, screened based on their abstract relevancy and full-text availability (n=147) and then assessed for eligibility (n=40). Eligible articles were included if they had explicitly focused on dashboards, performance measurement systems or executive information systems design. Finally, 28 relevant articles included in the study. Results: Creating high-quality performance dashboards requires addressing both performance measurement and executive information systems design issues. Covering these two fields, identified contents were categorized to four main domains: KPIs development, Data Sources and data generation, Integration of dashboards to source systems, and Information presentation issues. Conclusion: This study implies the main steps to develop dashboards for the purpose of performance management. Performance dashboards developed on performance measurement and executive information systems principles and supported by proper back-end infrastructure will result in creation of dynamic reports that help healthcare managers to consistently measure the performance, continuously detect outliers, deeply analyze causes of poor performance, and effectively plan for the future. PMID:26635442

  14. Measuring primary care practice performance within an integrated delivery system: a case study.

    PubMed

    Stewart, Louis J; Greisler, David

    2002-01-01

    This article examines the use of an integrated performance measurement system to plan and control primary care service delivery within an integrated delivery system. We review a growing body of literature that focuses on the development and implementation of management reporting systems among healthcare providers. Our study extends the existing literature by examining the use of performance information generated by an integrated performance measurement system within a healthcare organization. We conduct our examination through a case study of the WMG Primary Care Medicine Group, the primary care medical group practice of WellSpan Health System. WellSpan Health System is an integrated delivery system that serves south central Pennsylvania and northern Maryland. Our study examines the linkage between WellSpan Health's strategic objectives and its primary care medicine group's integrated performance measurement system. The conceptual design of this integrated performance measurement system combines financial metrics with practice management and clinical operating metrics to provide a more complete picture of medical group performance. Our findings demonstrate that WellSpan Health was able to achieve superior financial results despite a weak linkage between its integrated performance measurement system and its strategic objectives. WellSpan Health achieved this objective for its primary care medicine group by linking clinical performance information to physician compensation and reporting practice management performance through the use of statistical process charts. They found that the combined mechanisms of integrated performance measurement and statistical process control charts improved organizational learning and communications between organizational stakeholders.

  15. Performance Measurement and the Governance of American Academic Science

    ERIC Educational Resources Information Center

    Feller, Irwin

    2009-01-01

    Neoliberal precepts of the governance of academic science-deregulation; reification of markets; emphasis on competitive allocation processes have been conflated with those of performance management--if you cannot measure it, you cannot manage it--into a single analytical and consequent single programmatic worldview. As applied to the United…

  16. Private sector data for performance management.

    DOT National Transportation Integrated Search

    2011-07-01

    This report examines and analyzes technical and institutional issues associated with the use of private sector travel time and speed data for public sector performance management. The primary data needs for congestion performance measures are outline...

  17. What's Measured Is Not Necessarily What Matters: A Cautionary Story from Public Health

    PubMed Central

    Schwartz, Robert

    2016-01-01

    A systematic review of the introduction and use of outcome-based performance management systems for public health organizations found differences between their use as a management system (which requires rigorous definition and measurement to allow comparison across organizational units) versus for improvement (which may require more flexibility). What is included in performance measurement/management systems is influenced by ease of measurement, data quality, ability of organization to control outcomes, ability to measure success in terms of doing things (rather than preventing things) and what is already happening. To the extent that most providers wish to do a good job, the availability of good data to enable benchmarking and improvement is an important step forward. However, to the extent that the health of a population is dependent on multiple factors, many beyond the mandate of the health system, too extensive a reliance on performance measurement may risk unintended consequences of marginalizing critical activities. PMID:28032824

  18. Auditing emergency management programmes: Measuring leading indicators of programme performance.

    PubMed

    Tomsic, Heather

    Emergency Management Programmes benefit from review and measurement against established criteria. By measuring current vs required programme elements for their actual currency, completeness and effectiveness, the resulting timely reports of achievements and documentation of identified gaps can effectively be used to rationally support prioritised improvement. Audits, with their detailed, triangulated and objectively weighted processes, are the ultimate approach in terms of programme content measurement. Although Emergency Management is often presented as a wholly separate operational mechanism, distinct and functionally different from the organisation's usual management structure, this characterisation is only completely accurate while managing an emergency itself. Otherwise, an organisation's Emergency Management Programme is embedded within that organisation and dependent upon it. Therefore, the organisation's culture and structure of management, accountability and measurement must be engaged for the programme to exist, much less improve. A wise and successful Emergency Management Coordinator does not let the separate and distinct nature of managing an emergency obscure their realisation of the need for an organisation to understand and manage all of the other programme components as part of its regular business practices. This includes its measurement. Not all organisations are sufficiently large or capable of supporting the use of an audit. This paper proposes that alternate, less formal, yet effective mechanisms can be explored, as long as they reflect and support organisational management norms, including a process of relatively informal measurement focused on the organisation's own perception of key Emergency Management Programme performance indicators.

  19. Manager traits and quality-of-care performance in hospitals.

    PubMed

    Aij, Kjeld Harald; Aernoudts, René L M C; Joosten, Gepke

    2015-07-06

    This paper aims to assess the impact of the leadership traits of chief executive officers (CEOs) on hospital performance in the USA. The effectiveness and efficiency of the CEO is of critical importance to the performance of any organization, including hospitals. Management systems and manager behaviours (traits) are of crucial importance to any organization because of their connection with organizational performance. To identify key factors associated with the quality of care delivered by hospitals, the authors gathered perceptions of manager traits from chief executive officers (CEOs) and followers in three groups of US hospitals delivering different levels of quality of care performance. Three high- and three low-performing hospitals were selected from the top and bottom 20th percentiles, respectively, using a national hospital ranking system based on standard quality of care performance measures. Three lean hospitals delivering intermediate performance were also selected. A survey was used to gather perceptions of manager traits (providing a modern or lean management system inclination) from CEOs and their followers in the three groups, which were compared. Four traits were found to be significantly different (alpha < 0.05) between lean (intermediate-) and low-performing hospitals. The different perceptions between these two hospital groups were all held by followers in the low-performing hospitals and not the CEOs, and all had a modern management inclination. No differences were found between lean (intermediate-) and high-performing hospitals, or between high- and low-performing hospitals. These findings support a need for hospital managers to acquire appropriate traits to achieve lean transformation, support a benefit of measuring manager traits to assess progress towards lean transformation and lend weight to improved quality of care that can be delivered by hospitals adopting a lean system of management.

  20. Data driven performance measures for effective management of complex transportation networks.

    DOT National Transportation Integrated Search

    2014-02-01

    This research aims to explore performance measures quantified based on different transportation data sources. It examined the major : performance measures that can help describe both traffic operations and safety conditions. The available data source...

  1. Exploring the effect of at-risk case management compensation on hospital pay-for-performance outcomes: tools for change.

    PubMed

    Granata, Randy L; Hamilton, Karen

    2015-01-01

    Acute care nurse case managers are charged with compliance oversight, managing throughput, and ensuring safe care transitions. Leveraging the roles of nurse case managers and social workers during care transitions translates into improved fiscal performance under the Affordable Care Act. This article aims to equip leaders in the field of case management with tools to facilitate the alignment of case management systems with hospital pay-for-performance measures. A quality improvement project was implemented at a hospital in south Alabama to examine the question: for acute care case managers, what is the effect of key performance indictors using an at-risk compensation model in comparison to past nonincentive models on hospital readmissions, lengths of stay, and patient satisfaction surrounding the discharge process. Inpatient acute care hospital. The implementation of an at-risk compensation model using key performance indicators, Lean Six Sigma methodology, and Creative Health Care Management's Relationship-Based Care framework demonstrated reduced length of stay, hospital readmissions, and improved patient experiences. Regulatory changes and new models of reimbursement in the acute care environment have created the perfect storm for case management leaders. Hospital fiscal performance is dependent on effective case management processes and the ability to optimize scarce resources. The quality improvement project aimed to further align case management systems and structures with hospital pay-for-performance measures. Tools for change were presented to assist leaders with the change acceleration process.

  2. Towards a balanced performance measurement system in a public health care organization.

    PubMed

    Yuen, Peter P; Ng, Artie W

    2012-01-01

    This article attempts to devise an integrated performance measurement framework to assess the Hong Kong Hospital Authority (HA) management system by harnessing previous performance measurement systems. An integrated evaluative framework based on the balanced score card (BSC) was developed and applied using the case study method and longitudinal data to evaluate the HA's performance management system. The authors unveil evolving HA performance indicators (P1). Despite the HA staffs explicit quality emphasis, cost control remains the primary focus in their performance measurements. RESEARCH LHNITATIONS/IMPLICATIONS: Data used in this study are from secondary sources, disclosed mostly by HA staff. This study shows public sector staff often attach too much importance to cost control and easily measurable activities at the expense of quality and other less easily measurable attributes'. A balanced performance measurement system, linked to health targets, with a complementary budgeting process that supports pertinent resource allocation is yet to be implemented in Hong Kong's public hospitals.

  3. Manage your human sigma.

    PubMed

    Fleming, John H; Coffman, Curt; Harter, James K

    2005-01-01

    If sales and service organizations are to improve, they must learn to measure and manage the quality of the employee-customer encounter. Quality improvement methodologies such as Six Sigma are extremely useful in manufacturing contexts, but they're less useful when it comes to human interactions. To address this problem, the authors have developed a quality improvement approach they refer to as Human Sigma. It weaves together a consistent method for assessing the employee-customer encounter and a disciplined process for managing and improving it. There are several core principles for measuring and managing the employee-customer encounter: It's important not to think like an economist or an engineer when assessing interactions because emotions inform both sides' judgments and behavior. The employee-customer encounter must be measured and managed locally, because there are enormous variations in quality at the work-group and individual levels. And to improve the quality of the employee-customer interaction, organizations must conduct both short-term, transactional interventions and long-term, transformational ones. Employee engagement and customer engagement are intimately connected--and, taken together, they have an outsized effect on financial performance. They therefore need to be managed holistically. That is, the responsibility for measuring and monitoring the health of employee-customer relationships must reside within a single organizational structure, with an executive champion who has the authority to initiate and manage change. Nevertheless, the local manager remains the single most important factor in local group performance. A local manager whose work group shows suboptimal performance should be encouraged to conduct interventions, such as targeted training, performance reviews, action learning, and individual coaching.

  4. Managing hospital doctors and their practice: what can we learn about human resource management from non-healthcare organisations?

    PubMed

    Trebble, Timothy M; Heyworth, Nicola; Clarke, Nicholas; Powell, Timothy; Hockey, Peter M

    2014-11-21

    Improved management of clinicians' time and practice is advocated to address increasing demands on healthcare provision in the UK National Health Service (NHS). Human resource management (HRM) is associated with improvements in organisational performance and outcomes within and outside of healthcare, but with limited use in managing individual clinicians. This may reflect the absence of effective and transferrable models. The current systems of managing the performance of individual clinicians in a secondary healthcare organisation were reviewed through the study of practice in 10 successful partnership organisations, including knowledge worker predominant, within commercial, public and voluntary sector operating environments. Reciprocal visits to the secondary healthcare environment were undertaken. Six themes in performance related HRM were identified across the external organisations representing best practice and considered transferrable to managing clinicians in secondary care organisations. These included: performance measurement through defined outcomes at the team level with decision making through local data interpretation; performance improvement through empowered formal leadership with organisational support; individual performance review (IPR); and reward, recognition and talent management. The role of the executive was considered essential to support and implement effective HRM, with management of staff performance, behaviour and development integrated into organisational strategy, including through the use of universally applied values and effective communication. These approaches reflected many of the key aspects of high performance work systems and strategic HRM. There is the potential to develop systems of HRM of individual clinicians in secondary healthcare to improve practice. This should include both performance measurement and performance improvement but also engagement at an organisational level. This suggests that effective HRM and performance management of individual clinicians may be possible but requires an alternative approach for the NHS.

  5. Synthesis of National and International Methodologies Used for Bridge Health Indices

    DOT National Transportation Integrated Search

    2016-05-01

    Bridge performance measures are important components of any successful Bridge Management System. Different types of performance measures have been developed for various purposes. The types of performance measures are usually a reflection of an agency...

  6. Measurement issues in the evaluation of chronic disease self-management programs.

    PubMed

    Nolte, Sandra; Elsworth, Gerald R; Newman, Stanton; Osborne, Richard H

    2013-09-01

    To provide an in-depth analysis of outcome measures used in the evaluation of chronic disease self-management programs consistent with the Stanford curricula. Based on a systematic review on self-management programs, effect sizes derived from reported outcome measures are categorized according to the quality of life appraisal model developed by Schwartz and Rapkin which classifies outcomes from performance-based measures (e.g., clinical outcomes) to evaluation-based measures (e.g., emotional well-being). The majority of outcomes assessed in self-management trials are based on evaluation-based methods. Overall, effects on knowledge--the only performance-based measure observed in selected trials--are generally medium to large. In contrast, substantially more inconsistent results are found for both perception- and evaluation-based measures that mostly range between nil and small positive effects. Effectiveness of self-management interventions and resulting recommendations for health policy makers are most frequently derived from highly variable evaluation-based measures, that is, types of outcomes that potentially carry a substantial amount of measurement error and/or bias such as response shift. Therefore, decisions regarding the value and efficacy of chronic disease self-management programs need to be interpreted with care. More research, especially qualitative studies, is needed to unravel cognitive processes and the role of response shift bias in the measurement of change.

  7. USING BIOASSAYS TO EVALUATE THE PERFORMANCE OF RISK MANAGEMENT TECHNIQUES

    EPA Science Inventory

    Often, the performance of risk management techniques is evaluated by measuring the concentrations of the chemials of concern before and after risk management effoprts. However, using bioassays and chemical data provides a more robust understanding of the effectiveness of risk man...

  8. Effects of performance measure implementation on clinical manager and provider motivation.

    PubMed

    Damschroder, Laura J; Robinson, Claire H; Francis, Joseph; Bentley, Douglas R; Krein, Sarah L; Rosland, Ann-Marie; Hofer, Timothy P; Kerr, Eve A

    2014-12-01

    Clinical performance measurement has been a key element of efforts to transform the Veterans Health Administration (VHA). However, there are a number of signs that current performance measurement systems used within and outside the VHA may be reaching the point of maximum benefit to care and in some settings, may be resulting in negative consequences to care, including overtreatment and diminished attention to patient needs and preferences. Our research group has been involved in a long-standing partnership with the office responsible for clinical performance measurement in the VHA to understand and develop potential strategies to mitigate the unintended consequences of measurement. Our aim was to understand how the implementation of diabetes performance measures (PMs) influences management actions and day-to-day clinical practice. This is a mixed methods study design based on quantitative administrative data to select study facilities and quantitative data from semi-structured interviews. Sixty-two network-level and facility-level executives, managers, front-line providers and staff participated in the study. Qualitative content analyses were guided by a team-based consensus approach using verbatim interview transcripts. A published interpretive motivation theory framework is used to describe potential contributions of local implementation strategies to unintended consequences of PMs. Implementation strategies used by management affect providers' response to PMs, which in turn potentially undermines provision of high-quality patient-centered care. These include: 1) feedback reports to providers that are dissociated from a realistic capability to address performance gaps; 2) evaluative criteria set by managers that are at odds with patient-centered care; and 3) pressure created by managers' narrow focus on gaps in PMs that is viewed as more punitive than motivating. Next steps include working with VHA leaders to develop and test implementation approaches to help ensure that the next generation of PMs motivate truly patient-centered care and are clinically meaningful.

  9. Measuring, managing and maximizing refinery performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bascur, O.A.; Kennedy, J.P.

    1996-01-01

    Implementing continuous quality improvement is a confluence of total quality management, people empowerment, performance indicators and information engineering. Supporting information technologies allow a refiner to narrow the gap between management objectives and the process control level. Dynamic performance monitoring benefits come from production cost savings, improved communications and enhanced decision making. A refinery workgroup information flow model helps automate continuous improvement of processes, performance and the organization. The paper discusses the rethinking of refinery operations, dynamic performance monitoring, continuous process improvement, the knowledge coordinator and repository manager, an integrated plant operations workflow, and successful implementation.

  10. Proposed Performance Measures and Strategies for Implementation of the Fatigue Risk Management Guidelines for Emergency Medical Services

    DOT National Transportation Integrated Search

    2018-01-11

    Background: Performance measures are a key component of implementation, dissemination, and evaluation of evidence-based guidelines (EBGs). We developed performance measures for Emergency Medical Services (EMS) stakeholders to enable the implementatio...

  11. Managing patient deterioration: assessing teamwork and individual performance.

    PubMed

    Cooper, Simon; Cant, Robyn; Porter, Jo; Missen, Karen; Sparkes, Louise; McConnell-Henry, Tracy; Endacott, Ruth

    2013-05-01

    To assess the ability of rural Australian nurse teams to manage deteriorating patients. This quasi-experimental design used pre- and post-intervention assessments and observation to evaluate nurses' simulated clinical performance. Registered nurses (n=44) from two hospital wards completed a formative knowledge assessment and three team-based video recorded scenarios (Objective Structured Clinical Examinations (OSCE)). Trained patient actors simulated deteriorating patients. Skill performance and situation awareness were measured and team performance was rated using the Team Emergency Assessment Measure. Knowledge in relation to patient deterioration management varied (mean 63%, range 27-100%) with a median score of 64%. Younger nurses with a greater number of working hours scored the highest (p=0.001). OSCE performance was generally low with a mean performance of 54%, but performance was maintained despite the increasing complexity of the scenarios. Situation awareness was generally low (median 50%, mean 47%, range 17-83%, SD 14.03) with significantly higher levels in younger participants (r=-0.346, p=0.021). Teamwork ratings averaged 57% with significant associations between the subscales (Leadership, Teamwork and Task Management) (p<0.006), the global rating scale (p<0.001) and two of the OSCE measures (p<0.049). Feedback from participants following the programme indicated significant improvements in knowledge, confidence and competence (p<0.001). Despite a satisfactory knowledge base, the application of knowledge was low with notable performance deficits in these demanding and stressful situations. The identification and management of patient deterioration needs to be taught in professional development programmes incorporating high fidelity simulation techniques. The Team Emergency assessment tool proved to be a valid measure of team performance in patient deterioration scenarios.

  12. Exploratory data project : freight resiliency performance measures.

    DOT National Transportation Integrated Search

    2010-03-01

    Exploratory Data Project: Freight Resiliency Performance Measures. (2009-10) FHWA's Office of Freight Management : and Operations, through a partnership with the American Transportation Research Institute (ATRI), established a Freight : Performance M...

  13. Look at me, I'm happy and creative: The effect of impression management on behavior in social presence.

    PubMed

    Uziel, Liad

    2010-12-01

    The present research tested competing approaches to individual differences in impression management (as measured with social desirability scales) and their implication for behavior in social contexts. A defensiveness approach argues that impression management is a source of defensive self-presentation, which causes performance impairment in public social settings. The competing adjustment approach argues that impression management measures friendliness and self-control, which should bring about performance facilitation in public social settings. To decide between these approaches, two experiments utilized a social facilitation paradigm, whereby task performance was compared between an alone and a public condition. The results supported the predictions of the adjustment approach. Across different tasks, a high impression management score was associated with performance facilitation in social presence, expressed in greater creativity, positive implicit affect, and high self-control. The results reveal previously unnoticed constructive effects of impression management, supporting the reframing of the trait as reflecting interpersonally oriented self-control.

  14. Applying organization science to assess the management performance of Marine Protected Areas: An exploratory study.

    PubMed

    Scianna, Claudia; Niccolini, Federico; Bianchi, Carlo Nike; Guidetti, Paolo

    2018-06-18

    Marine Protected Areas (MPAs) are important tools to achieve marine conservation and resources management goals. The management effectiveness of MPAs (the degree to which MPAs achieve their goals) is highly variable and can be affected by many MPA attributes, for example their design, enforcement and age. Another key factor possibly affecting MPA management effectiveness is the management performance, here conceived according to Horigue et al. definition (2014) as the "level of effort exerted to enhance and sustain management of MPAs". Organization Science (OS), the discipline that studies organizations, can offer a useful framework to assess and interpret MPA management performance. Using an exploratory multiple case study approach, we applied OS principles to 11 Mediterranean MPAs in order to: i) characterize several MPA organizational features; ii) assess MPA management performance (evaluated as the effort deployed in, for example, planning the future, formalizing measurable goals, and implementing specific strategies). Results show that a number of organizational features and networking attributes are highly variable among the MPAs we have studied. For instance, goals are seldom measurable and the strategy to achieve goals is not systematically pursued. Two relevant outcomes emerge from this exploratory study: i) the management performance of the MPAs considered needs considerable improvements; ii) the methods and the approach proposed could help MPAs' managers and policy makers to understand how to improve their management performance and, consequently, their effectiveness. Copyright © 2018. Published by Elsevier Ltd.

  15. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    PubMed

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  16. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    PubMed Central

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  17. Home Economics. Exploration of Clothing Management, Production and Service Occupations. Performance Objectives. Criterion Measures.

    ERIC Educational Resources Information Center

    Duval County School Board, Jacksonville, FL.

    Several intermediate performance objectives and corresponding criterion measures are presented for each of five terminal objectives for a 12- to 18-week course designed to provide students in grades 8 or 9 with opportunities to explore a broad range of clothing management, production, and service occupations. The course was designed to provide…

  18. Control Strategies for Corridor Management

    DOT National Transportation Integrated Search

    2016-06-28

    Integrated management of travel corridors comprising of freeways and adjacent arterial streets can potentially improve the performance of the highway facilities. However, several research gaps exist in data collection and performance measurement, ana...

  19. Measuring the ROI on Knowledge Management Systems.

    ERIC Educational Resources Information Center

    Wickhorst, Vickie

    2002-01-01

    Defines knowledge management and corporate portals and provides a model that can be applied to assessing return on investment (ROI) for a knowledge management solution. Highlights include leveraging knowledge in an organization; assessing the value of human capital; and the Intellectual Capital Performance Measurement Model. (LRW)

  20. On Performance in Higher Education: Towards Performance Governance

    ERIC Educational Resources Information Center

    Sarrico, Claudia S.

    2010-01-01

    The paper has a conceptual nature, and will depart from the literatures on performance management in general and public management in particular and confront them with the literature on higher education studies. Higher education mirrors the developments of other sectors, such as the increasing interest in performance measurement and the continuous…

  1. Problems in air traffic management. VII., Job training performance of air traffic control specialists - measurement, structure, and prediction.

    DOT National Transportation Integrated Search

    1965-07-01

    A statistical study of training- and job-performance measures of several hundred Air Traffic Control Specialists (ATCS) representing Enroute, Terminal, and Flight Service Station specialties revealed that training-performance measures reflected: : 1....

  2. Whole Building Cost and Performance Measurement: Data Collection Protocol Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, Kimberly M.; Spees, Kathleen L.; Kora, Angela R.

    2009-03-27

    This protocol was written for the Department of Energy’s Federal Energy Management Program (FEMP) to be used by the public as a tool for assessing building cost and performance measurement. The primary audiences are sustainable design professionals, asset owners, building managers, and research professionals within the Federal sector. The protocol was developed based on the need for measured performance and cost data on sustainable design projects. Historically there has not been a significant driver in the public or private sector to quantify whole building performance in comparable terms. The deployment of sustainable design into the building sector has initiated manymore » questions on the performance and operational cost of these buildings.« less

  3. Power Electronics and Thermal Management | Transportation Research | NREL

    Science.gov Websites

    Power Electronics and Thermal Management Power Electronics and Thermal Management This is the March Gearhart's testimony. Optical Thermal Characterization Enables High-Performance Electronics Applications New transient thermoreflectance measures the thermal performance of materials and their interfaces that cannot

  4. Development of performance measurement for freight transportation.

    DOT National Transportation Integrated Search

    2014-09-01

    In this project, the researchers built a set of performance measures that are unified, user-oriented, scalable, systematic, effective, and : calculable for intermodal freight management and developed methodologies to calculate and use the measures. :...

  5. [Supply services at health facilities: measuring performance].

    PubMed

    Dacosta Claro, I

    2001-01-01

    Performance measurement, in their different meanings--either balance scorecard or outputs measurement--have become an essential tool in today's organizations (World-Class organizations) to improve service quality and reduce costs. This paper presents a performance measurement system for the hospital supply chain. The system is organized in different levels and groups of indicators in order to show a hierarchical, coherent and integrated vision of the processes. Thus, supply services performance is measured according to (1) financial aspects, (2) customers satisfaction aspects and (3) internal aspects of the processes performed. Since the informational needs of the managers vary within the administrative structure, the performance measurement system is defined in three hierarchical levels. Firstly, the whole supply chain, with the different interrelation of activities. Secondly, the three main processes of the chain--physical management of products, purchasing and negotiation processes and the local storage units. And finally, the performance measurement of each activity involved. The system and the indicators have been evaluated with the participation of 17 health services of Quebec (Canada), however, and due to the similarities of the operation, could be equally implemented in Spanish hospitals.

  6. Road weather management performance metrics.

    DOT National Transportation Integrated Search

    2008-04-29

    This report presents the results of a study to identify appropriate measures of performance that can be attributed to the Federal Highway Administrations (FHWA) Road Weather Management Program (RWMP) products and activities. Specifically, the stud...

  7. Drivers of coral reef marine protected area performance

    PubMed Central

    Hargreaves-Allen, Venetia Alexa; Mourato, Susana; Milner-Gulland, Eleanor Jane

    2017-01-01

    Coral reefs are severely threatened and a principal strategy for their conservation is marine protected areas (MPAs). However the drivers of MPA performance are complex and there are likely to be trade-offs between different types of performance (e.g. conservation or welfare related outcomes). We compiled a global dataset from expert knowledge for 76 coral reef MPAs in 33 countries and identified a set of performance measures reflecting ecological and socio-economic outcomes, achievement of aims and reduction of threats, using spatial or temporal comparisons wherever possible. We wanted to test the extent to which distinct types of performance occurred simultaneously, understood as win-win outcomes. Although certain performance measures were correlated, most were not, suggesting trade-offs that limit the usefulness of composite performance scores. Hypotheses were generated as to the impact of MPA features, aims, location, management and contextual variables on MPA performance from the literature. A multivariate analysis was used to test hypotheses as to the relative importance of these “drivers” on eight uncorrelated performance measures. The analysis supported some hypotheses (e.g. benefit provision for the local community improved performance), but not others (e.g. higher overall budget and more research activity did not). Factors endogenous to the MPA (such as size of the no-take area) were generally more significant drivers of performance than exogenous ones (such as national GDP). Different types of performance were associated with different drivers, exposing the trade-offs inherent in management decisions. The study suggests that managers are able to influence MPA performance in spite of external threats and could inform adaptive management by providing an approach to test for the effects of MPA features and management actions in different contexts and so to inform decisions for allocation of effort or funds to achieve specific goals. PMID:28644890

  8. Mitigating the Impact of Nurse Manager Large Spans of Control.

    PubMed

    Simpson, Brenda Baird; Dearmon, Valorie; Graves, Rebecca

    Nurse managers are instrumental in achievement of organizational and unit performance goals. Greater spans of control for managers are associated with decreased satisfaction and performance. An interprofessional team measured one organization's nurse manager span of control, providing administrative assistant support and transformational leadership development to nurse managers with the largest spans of control. Nurse manager satisfaction and transformational leadership competency significantly improved following the implementation of large span of control mitigation strategies.

  9. Situation awareness measures for simulated submarine track management.

    PubMed

    Loft, Shayne; Bowden, Vanessa; Braithwaite, Janelle; Morrell, Daniel B; Huf, Samuel; Durso, Francis T

    2015-03-01

    The aim of this study was to examine whether the Situation Present Assessment Method (SPAM) and the Situation Awareness Global Assessment Technique (SAGAT) predict incremental variance in performance on a simulated submarine track management task and to measure the potential disruptive effect of these situation awareness (SA) measures. Submarine track managers use various displays to localize and track contacts detected by own-ship sensors. The measurement of SA is crucial for designing effective submarine display interfaces and training programs. Participants monitored a tactical display and sonar bearing-history display to track the cumulative behaviors of contacts in relationship to own-ship position and landmarks. SPAM (or SAGAT) and the Air Traffic Workload Input Technique (ATWIT) were administered during each scenario, and the NASA Task Load Index (NASA-TLX) and Situation Awareness Rating Technique were administered postscenario. SPAM and SAGAT predicted variance in performance after controlling for subjective measures of SA and workload, and SA for past information was a stronger predictor than SA for current/future information. The NASA-TLX predicted performance on some tasks. Only SAGAT predicted variance in performance on all three tasks but marginally increased subjective workload. SPAM, SAGAT, and the NASA-TLX can predict unique variance in submarine track management performance. SAGAT marginally increased subjective workload, but this increase did not lead to any performance decrement. Defense researchers have identified SPAM as an alternative to SAGAT because it would not require field exercises involving submarines to be paused. SPAM was not disruptive, but it is potentially problematic that SPAM did not predict variance in all three performance tasks. © 2014, Human Factors and Ergonomics Society.

  10. Exploring the state of health and safety management system performance measurement in mining organizations.

    PubMed

    Haas, Emily Joy; Yorio, Patrick

    2016-03-01

    Complex arguments continue to be articulated regarding the theoretical foundation of health and safety management system (HSMS) performance measurement. The culmination of these efforts has begun to enhance a collective understanding. Despite this enhanced theoretical understanding, however, there are still continuing debates and little consensus. The goal of the current research effort was to empirically explore common methods to HSMS performance measurement in mining organizations. The purpose was to determine if value and insight could be added into the ongoing approaches of the best ways to engage in health and safety performance measurement. Nine site-level health and safety management professionals were provided with 133 practices corresponding to 20 HSMS elements, each fitting into the plan, do, check, act phases common to most HSMS. Participants were asked to supply detailed information as to how they (1) assess the performance of each practice in their organization, or (2) would assess each practice if it were an identified strategic imperative. Qualitative content analysis indicated that the approximately 1200 responses provided could be described and categorized into interventions , organizational performance , and worker performance . A discussion of how these categories relate to existing indicator frameworks is provided. The analysis also revealed divergence in two important measurement issues; (1) quantitative vs qualitative measurement and reporting; and (2) the primary use of objective or subjective metrics. In lieu of these findings we ultimately recommend a balanced measurement and reporting approach within the three metric categories and conclude with suggestions for future research.

  11. Exploring the state of health and safety management system performance measurement in mining organizations

    PubMed Central

    Haas, Emily Joy; Yorio, Patrick

    2016-01-01

    Complex arguments continue to be articulated regarding the theoretical foundation of health and safety management system (HSMS) performance measurement. The culmination of these efforts has begun to enhance a collective understanding. Despite this enhanced theoretical understanding, however, there are still continuing debates and little consensus. The goal of the current research effort was to empirically explore common methods to HSMS performance measurement in mining organizations. The purpose was to determine if value and insight could be added into the ongoing approaches of the best ways to engage in health and safety performance measurement. Nine site-level health and safety management professionals were provided with 133 practices corresponding to 20 HSMS elements, each fitting into the plan, do, check, act phases common to most HSMS. Participants were asked to supply detailed information as to how they (1) assess the performance of each practice in their organization, or (2) would assess each practice if it were an identified strategic imperative. Qualitative content analysis indicated that the approximately 1200 responses provided could be described and categorized into interventions, organizational performance, and worker performance. A discussion of how these categories relate to existing indicator frameworks is provided. The analysis also revealed divergence in two important measurement issues; (1) quantitative vs qualitative measurement and reporting; and (2) the primary use of objective or subjective metrics. In lieu of these findings we ultimately recommend a balanced measurement and reporting approach within the three metric categories and conclude with suggestions for future research. PMID:26823642

  12. Integrating Fuel Treatments into Comprehensive Ecosystem Management

    Treesearch

    Kevin Hyde; Greg Jones; Robin Silverstein; Keith Stockmann; Dan Loeffler

    2006-01-01

    To plan fuel treatments in the context of comprehensive ecosystem management, forest managers must meet multiple-use and environmental objectives, address administrative and budget constraints, and reconcile performance measures from multiple policy directives. We demonstrate a multiple criteria approach to measuring success of fuel treatments used in the Butte North...

  13. Are Improvements in Measured Performance Driven by Better Treatment or "Denominator Management"?

    PubMed

    Harris, Alex H S; Chen, Cheng; Rubinsky, Anna D; Hoggatt, Katherine J; Neuman, Matthew; Vanneman, Megan E

    2016-04-01

    Process measures of healthcare quality are usually formulated as the number of patients who receive evidence-based treatment (numerator) divided by the number of patients in the target population (denominator). When the systems being evaluated can influence which patients are included in the denominator, it is reasonable to wonder if improvements in measured quality are driven by expanding numerators or contracting denominators. In 2003, the US Department of Veteran Affairs (VA) based executive compensation in part on performance on a substance use disorder (SUD) continuity-of-care quality measure. The first goal of this study was to evaluate if implementing the measure in this way resulted in expected improvements in measured performance. The second goal was to examine if the proportion of patients with SUD who qualified for the denominator contracted after the quality measure was implemented, and to describe the facility-level variation in and correlates of denominator contraction or expansion. Using 40 quarters of data straddling the implementation of the performance measure, an interrupted time series design was used to evaluate changes in two outcomes. All veterans with an SUD diagnosis in all VA facilities from fiscal year 2000 to 2009. The two outcomes were 1) measured performance-patients retained/patients qualified and 2) denominator prevalence-patients qualified/patients with SUD program contact. Measured performance improved over time (P < 0.001). Notably, the proportion of patients with SUD program contact who qualified for the denominator decreased more rapidly after the measure was implemented (p = 0.02). Facilities with higher pre-implementation denominator prevalence had steeper declines in denominator prevalence after implementation (p < 0.001). These results should motivate the development of measures that are less vulnerable to denominator management, and also the exploration of "shadow measures" to monitor and reduce undesirable denominator management.

  14. Understanding performance management in primary care.

    PubMed

    Rogan, Lisa; Boaden, Ruth

    2017-02-13

    Purpose Principal-agent theory (PAT) has been used to understand relationships among different professional groups and explain performance management between organisations, but is rarely used for research within primary care. The purpose of this paper is to explore whether PAT can be used to attain a better understanding of performance management in primary care. Design/methodology/approach Purposive sampling was used to identify a range of general practices in the North-west of England. Interviews were carried out with directors, managers and clinicians in commissioning and regional performance management organisations and within general practices, and the data analysed using matrix analysis techniques to produce a case study of performance management. Findings There are various elements of the principal-agent framework that can be applied in primary care. Goal alignment is relevant, but can only be achieved through clear, strategic direction and consistent interpretation of objectives at all levels. There is confusion between performance measurement and performance management and a tendency to focus on things that are easy to measure whilst omitting aspects of care that are more difficult to capture. Appropriate use of incentives, good communication, clinical engagement, ownership and trust affect the degree to which information asymmetry is overcome and goal alignment achieved. Achieving the right balance between accountability and clinical autonomy is important to ensure governance and financial balance without stifling innovation. Originality/value The principal-agent theoretical framework can be used to attain a better understanding of performance management in primary care; although it is likely that only partial goal alignment will be achieved, dependent on the extent and level of alignment of a range of factors.

  15. Managing for Results in America's Great City Schools. A Report of the Performance Measurement and Benchmarking Project

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2012

    2012-01-01

    "Managing for Results in America's Great City Schools, 2012" is presented by the Council of the Great City Schools to its members and the public. The purpose of the project was and is to develop performance measures that can improve the business operations of urban public school districts nationwide. This year's report includes data from 61 of the…

  16. Research Frontiers in Public Sector Performance Measurement

    NASA Astrophysics Data System (ADS)

    Zhonghua, Cai; Ye, Wang

    In "New Public Management" era, performance measurement has been widely used in managerial practices of public sectors. From the content and features of performance measurement, this paper aims to explore inspirations on Chinese public sector performance measurement, which based on a review of prior literatures including influencial factors, methods and indicators of public sector performance evaluation. In the end, arguments are presented in this paper pointed out the direction of future researches in this field.

  17. Educational Technology-Related Performance of Teaching Faculty in Higher Education: Implications for eLearning Management

    ERIC Educational Resources Information Center

    Larbi-Apau, Josephine A.; Guerra-Lopez, Ingrid; Moseley, James L.; Spannaus, Timothy; Yaprak, Attila

    2017-01-01

    The study examined teaching faculty's educational technology-related performances (ETRP) as a measure for predicting eLearning management in Ghana. A total of valid data (n = 164) were collected and analyzed on applied ISTE-NETS-T Performance Standards using descriptive and ANOVA statistics. Results showed an overall moderate performance with the…

  18. Evaluating firms' R&D performance using best worst method.

    PubMed

    Salimi, Negin; Rezaei, Jafar

    2018-02-01

    Since research and development (R&D) is the most critical determinant of the productivity, growth and competitive advantage of firms, measuring R&D performance has become the core of attention of R&D managers, and an extensive body of literature has examined and identified different R&D measurements and determinants of R&D performance. However, measuring R&D performance and assigning the same level of importance to different R&D measures, which is the common approach in existing studies, can oversimplify the R&D measuring process, which may result in misinterpretation of the performance and consequently fallacy R&D strategies. The aim of this study is to measure R&D performance taking into account the different levels of importance of R&D measures, using a multi-criteria decision-making method called Best Worst Method (BWM) to identify the weights (importance) of R&D measures and measure the R&D performance of 50 high-tech SMEs in the Netherlands using the data gathered in a survey among SMEs and from R&D experts. The results show how assigning different weights to different R&D measures (in contrast to simple mean) results in a different ranking of the firms and allow R&D managers to formulate more effective strategies to improve their firm's R&D performance by applying knowledge regarding the importance of different R&D measures. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  19. Clinically led performance management in secondary healthcare: evaluating the attitudes of medical and non-clinical managers.

    PubMed

    Trebble, Timothy M; Paul, Maureen; Hockey, Peter M; Heyworth, Nicola; Humphrey, Rachael; Powell, Timothy; Clarke, Nicholas

    2015-03-01

    Improving the quality and activity of clinicians' practice improves patient care. Performance-related human resource management (HRM) is an established approach to improving individual practice but with limited use among clinicians. A framework for performance-related HRM was developed from successful practice in non-healthcare organisations centred on distributive leadership and locally provided, validated and interpreted performance measurement. This study evaluated the response of medical and non-clinical managers to its implementation into a large secondary healthcare organisation. A semistructured qualitative questionnaire was developed from themes identified during framework implementation and included attitudes to previous approaches to measuring doctors' performance, and the structure and response to implementation of the performance-related HRM framework. Responses were analysed through a process of data summarising and categorising. A total of 29, from an invited cohort of 31, medical and non-clinical managers from departmental to executive level were interviewed. Three themes were identified: (1) previous systems of managing clinical performance were considered to be ineffective due to insufficient empowerment of medical managers and poor quality of available performance data; (2) the implemented framework was considered to address these needs and was positively received by medical and non-clinical managers; (3) introduction of performance-related HRM required the involvement of the whole organisation to executive level and inclusion within organisational strategy, structure and training. This study suggests that a performance-related HRM framework may facilitate the management of clinical performance in secondary healthcare, but is dependent on the design and methods of application used. Such approaches contrast with those currently proposed for clinicians in secondary healthcare in the UK and suggest that alternative strategies should be considered. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  20. Managers’ Compensation in a Mixed Ownership Industry: Evidence from Nursing Homes

    PubMed Central

    Huang, Sean Shenghsiu; Hirth, Richard A.; Smith, Dean G.

    2016-01-01

    An extensive literature is devoted to differences between for-profit and non-profit health-care providers’ prices, utilization, and quality. Less is known about for-profit and non-profit managers’ compensation and its relationship with financial and quality performance. The aim of this study is to examine whether for-profit and non-profit nursing homes place differential weights on financial and quality performance in determining managers’ compensation. Using a unique 8-year dataset on Ohio nursing homes, fixed-effect regression models of managers’ compensation include financial and quality performance as well as other explanatory variables concerning firm and market characteristics and manager qualifications. Among for-profit nursing homes, compensation of owner-managers and non-owner managers are compared. Compensation of for-profit managers is significantly positively associated with profit margin and return-on-assets, while compensation of non-profit managers does not exhibit any consistent relationship with financial measures. Compensation of neither for-profit nor non-profit managers is significantly related to quality measures. Nursing home size and managers’ years of experience are the only consistent determinants of compensation. Owner-managers earn significantly higher compensation than non-owner managers and their compensation is less related to nursing home performance. Finding that home size and experience are strong determinants of compensation, and the association with ownership and financial performance for for-profit nursing homes are as expected. The insignificant relationship between compensation and quality performance is potentially troublesome. PMID:28083528

  1. Emissions & Measurements - Black Carbon | Science ...

    EPA Pesticide Factsheets

    Emissions and Measurement (EM) research activities performed within the National Risk Management Research Lab NRMRL) of EPA's Office of Research and Development (ORD) support measurement and laboratory analysis approaches to accurately characterize source emissions, and near source concentrations of air pollutants. They also support integrated Agency research programs (e.g., source to health outcomes) and the development of databases and inventories that assist Federal, state, and local air quality managers and industry implement and comply with air pollution standards. EM research underway in NRMRL supports the Agency's efforts to accurately characterize, analyze, measure and manage sources of air pollution. This pamphlet focuses on the EM research that NRMRL researchers conduct related to black carbon (BC). Black Carbon is a pollutant of concern to EPA due to its potential impact on human health and climate change. There are extensive uncertainties in emissions of BC from stationary and mobile sources. Emissions and Measurement (EM) research activities performed within the National Risk Management Research Lab NRMRL) of EPA's Office of Research and Development (ORD)

  2. Integrated Measurement of Crew Resource Management and Technical Flying Skills

    DOT National Transportation Integrated Search

    1993-08-01

    This report presents the findings of a study designed with two objectives: to produce a prototype performance : measurement instrument (PMI) that integrates the assessment of Crew Resource Management (CRM) and technical flying : skills and to investi...

  3. Promoting Accountability and Continual Improvement: A Review of the Respective Roles of Performance Measurement, Auditing, Evaluation, and Reporting.

    ERIC Educational Resources Information Center

    Reid, William

    1999-01-01

    Provides a synthesis of the literature pertaining to the principles and practices of performance measurement, auditing, evaluation, and reporting. Discusses how bringing these elements together in a performance management system can be achieved through refinement of strategic direction, reporting on key measures, and periodic, systematic…

  4. Transportation performance measures for outcome based system management and monitoring.

    DOT National Transportation Integrated Search

    2014-09-01

    The Oregon Department of Transportation (ODOT) is mature in its development and use of : performance measures, however there was not a standard approach for selecting measures nor : evaluating if existing ones were used to inform decision-making. Thi...

  5. Role delineation study for the American Society for Pain Management Nursing.

    PubMed

    Willens, Joyce S; DePascale, Christine; Penny, James

    2010-06-01

    A role delineation study, or job analysis, is a necessary step in the development of a quality credentialing program. The process requires a logical approach and systematic methods to have an examination that is legally defensible. There are three main phases: initial development and evaluation, validation study, and development of test specifications. In the first phase, the content expert panel discussed performance domains that exist in pain management nursing. The six domains developed were: 1) assessment, monitoring, and evaluation of pain; 2) pharmacologic pain management; 3) nonpharmacologic pain management; 4) therapeutic communication and counseling; 5) patient and family teaching; and 6) collaborative and organizational activities. The panel then produced a list of 70 task statements to develop an online survey which was sent to independent reviewers with expertise in pain management nursing. After the panel reviewed the results of the pilot test, it was decided to clarify a few items that did not perform as expected. After the questionnaire was finalized it was distributed to 1,500 pain management nurses. The final yield was 585 usable returns, for a response rate of 39%. Thirty-three percent of the respondents reported a bachelor's degree in nursing as the highest degree awarded. Over 80% indicated that they were certified in pain management. Over 35% reported working in a staff position, 14% as a nurse practitioner, and 13% as a clinical nurse specialist. Part of the questionnaire asked the participants to rate performance expectation, consequence or the likelihood that the newly certified pain management nurse could cause harm, and the frequency of how often that nurse performs in each of the performance domains. The performance expectation was rated from 0 (the newly certified pain management nurse was not at all expected to perform the domain task) to 2 (after 6 months the newly certified pain management nurse would be expected to perform the domain task). The consequences of the degree would be the inability of the newly certified pain management nurse to perform duties or tasks in each domain was rated from 0 (no harm) to 4 (extreme harm). The first domain received the highest average frequency rating. The pharmacologic domain received the highest mean rating on consequence. The reliability of all scales was 0.95 or higher, which indicated that the questionnaire consistently measured what it was intended to measure. The quality of the questionnaire is an indicator that certification is one measure of nursing excellence. (c) 2010 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  6. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  7. Balanced scorecard as a framework for driving performance in managed care organizations.

    PubMed

    Sahney, V K

    1998-01-01

    Managed care organizations in a highly competitive environment constantly face the pressure of improving their financial performance. At the same time, customers of the organization expect the organization to deliver high-quality outcomes and improve customer service. Payers expect the organization to develop innovative new products to meet their needs. This article presents an approach called "Balanced Scorecard" for measurement, development of strategy, and performance improvement in a managed care organization.

  8. Incentives and Their Dynamics in Public Sector Performance Management Systems

    ERIC Educational Resources Information Center

    Heinrich, Carolyn J.; Marschke, Gerald

    2010-01-01

    We use the principal-agent model as a focal theoretical frame for synthesizing what we know, both theoretically and empirically, about the design and dynamics of the implementation of performance management systems in the public sector. In this context, we review the growing body of evidence about how performance measurement and incentive systems…

  9. A framework for operationalization of strategic plans and metrics for corporate performance measurement in transportation asset management

    NASA Astrophysics Data System (ADS)

    Mteri, Hassan H.

    This thesis investigated the business processes required to translate corporate-level strategic plans into tactical and operational plans in the context of transportation asset management. The study also developed a framework for effective performance measure for departments of transportation. The thesis was based on a case study of transportation agencies in the U.S.A. and Canada. The scope is therefore limited or more directly applicable to transportation assets such as pavement, bridges and culverts. The goal was to address the problem of translating or managing strategic plans, especially in the context of the public sector responsible for operating transportation infrastructure. It was observed that many agencies have been successful in formulating good strategic plans but they have performed relatively poorly in translating such corporate-level strategic plans into operational activities. A questionnaire survey was designed and targeted about 30 state agencies that are currently active in transportation asset management. Twenty one (21) transportation agencies in the USA and Canada responded to the questionnaire. The analysis of the questionnaire data showed that there is a lack of a standard approach to managing corporate strategic plans in transportation agencies. The results also indicated that most transportation agencies operate in three organizational levels but there was no systematic approach of translating goal and objectives from high level to lower levels. Approaches in performance measurement were found to vary from agency to agency. A number of limitations were identified in the existing practice on performance measurements. Key weaknesses include the large number of measures in use (as many as 25 or more), and the disconnection between the measures used and the corporate goals and objectives. Lessons from the private sector were thoroughly reviewed in order to build the groundwork for adapting existing tools to the public sector. The existing literature, assumptions and characteristics that make the Balanced Scorecards and strategy maps work effectively in the private sector were identified. Gaps in implementation of strategic plans and the use of Balanced Scorecard in the public sector were derived. Although Balanced Scorecards have previously been used to a limited extent in transportation agencies, the use of combined Balanced Scorecards and strategy maps with a much broader utility of translating strategic plans into tactical and operational activities for Transportation Asset Management is yet to be established. The thesis presents a framework to operationalize strategic plans through the combined application of Balanced Scorecards and strategy maps. The proposed framework aligns overarching objectives in all organizational levels: corporate, tactical, and operation, in which detail information is delegated from top level to lower levels. Furthermore, the thesis presents a proposed framework for developing and using effective corporate performance measures. The framework for performance measures provides a key tool for tracking progress and ensuring overall operationalization of strategic plans in transportation agencies. The thesis presents a methodology to assess existing performance measures so that agencies can reduce the number of measures, to be more effective and manageable. It was found that among other good characteristics, corporate performance measures must be tied to agency's goals and objectives and must be sensitive or responsive to program delivery activities and to the impacts of decisions about resource allocation.

  10. Using State-Wide Multiple Measures for School Leadership and Management: Costs Incurred vs. Benefits Gained

    ERIC Educational Resources Information Center

    Hentschke, Guilbert; Wohlstetter, Priscilla; Hirman, Jennifer; Zeehandelaar, Dara

    2011-01-01

    In this article, we examine the utility and value of multiple measures of school performance for school leaders and managers. The research was conducted within the context of the state of California through an investigation of how operators, managers and authorisers of autonomous "charter" (publicly financed but privately operated)…

  11. A whole process quality control system for energy measuring instruments inspection based on IOT technology

    NASA Astrophysics Data System (ADS)

    Yin, Bo; Liu, Li; Wang, Jiahan; Li, Xiran; Liu, Zhenbo; Li, Dewei; Wang, Jun; Liu, Lu; Wu, Jun; Xu, Tingting; Cui, He

    2017-10-01

    Electric energy measurement as a basic work, an accurate measurements play a vital role for the economic interests of both parties of power supply, the standardized management of the measurement laboratory at all levels is a direct factor that directly affects the fairness of measurement. Currently, the management of metering laboratories generally uses one-dimensional bar code as the recognition object, advances the testing process by manual management, most of the test data requires human input to generate reports. There are many problems and potential risks in this process: Data cannot be saved completely, cannot trace the status of inspection, the inspection process isn't completely controllable and so on. For the provincial metrology center's actual requirements of the whole process management for the performance test of the power measuring appliances, using of large-capacity RF tags as a process management information media, we developed a set of general measurement experiment management system, formulated a standardized full performance test process, improved the raw data recording mode of experimental process, developed a storehouse automatic inventory device, established a strict test sample transfer and storage system, ensured that all the raw data of the inspection can be traced back, achieved full life-cycle control of the sample, significantly improved the quality control level and the effectiveness of inspection work.

  12. Does your equipment maintenance management program measure up?

    PubMed

    Deinstadt, Deborah C

    2003-01-01

    Identifying a clear maintenance philosophy is the first step toward choosing the right program for your healthcare organization. The second step is gaining a clear understanding of how proposed savings and improvements will be delivered. The third and last step is requiring that the proposed company or manager have specific tools in place for measuring and analyzing program performance. There are three primary philosophies underlying current equipment management options. These include risk-transfer philosophy (e.g., maintenance insurance, service contracts, multi-vendor and outsource programs), asset management philosophy (e.g., programs delivering a management system based on managed time-and-materials), and internal management (in-house managed programs). The last step in selecting the right program is insisting that proper performance measurements be built into the proposed management program. A well-managed program provides results in three general areas: financial outcomes, operational improvements and process improvements. Financial outcomes are the easiest to measure. Operational and process improvements are more challenging to assess but equally important to the program's overall success. To accurately identify results in these three areas, the overall management program should measure the following eight separate components: procedures and support for department staff; equipment inventory, benchmark costs, and budget guidelines; experienced equipment support team; objective, independent analysis of maintenance events; repair documentation and reporting; vendor relations; equipment acquisition analysis; and recommendations for improvement. Do everything you reasonably can to assure that the selected company can work side-by-side with you, providing objective, measurable advice that is ultimately in your best interest. You will then know that you have been thorough in your marketplace selection and can confidently move into implementation, expecting tangible and successful results.

  13. Outpatient management of oral vitamin K antagonist therapy: defining and measuring high-quality management.

    PubMed

    Phillips, Katherine W; Ansell, Jack

    2008-01-01

    Oral anticoagulation therapy with warfarin is the mainstay of prevention and treatment of thromboembolic disease. However, it remains one of the leading causes of harmful medication errors and medication-related adverse events. The beneficial outcomes of oral anticoagulation therapy are directly dependent upon the quality of dose and anticoagulation management, but the literature is not robust with regards to what constitutes such management. This review focuses on, and attempts to define, the parameters of high-quality anticoagulation management and identifies the appropriate outcome measures constituting high-quality management. Elements discussed include the most fundamental measure, time in therapeutic range, along with other parameters including therapy initiation, time to therapeutic range, dosing management when patients are not in therapeutic range, perioperative dosing management, patient education, and other important outcome measures. Healthcare providers who manage oral anticoagulation therapy should utilize these parameters as a measure of their performance in an effort to achieve high-quality anticoagulation management.

  14. Evaluating health service quality: using importance performance analysis.

    PubMed

    Izadi, Azar; Jahani, Younes; Rafiei, Sima; Masoud, Ali; Vali, Leila

    2017-08-14

    Purpose Measuring healthcare service quality provides an objective guide for managers and policy makers to improve their services and patient satisfaction. Consequently, the purpose of this paper is to measure service quality provided to surgical and medical inpatients at Kerman Medical Sciences University (KUMS) in 2015. Design/methodology/approach A descriptive-analytic study, using a cross-sectional method in the KUMS training hospitals, was implemented between October 2 and March 15, 2015. Using stratified random sampling, 268 patients were selected. Data were collected using an importance-performance analysis (IPA) questionnaire, which measures current performance and determines each item's importance from the patients' perspectives. These data indicate overall satisfaction and appropriate practical strategies for managers to plan accordingly. Findings Findings revealed a significant gap between service importance and performance. From the patients' viewpoint, tangibility was the highest priority (mean=3.54), while reliability was given the highest performance (mean=3.02). The least important and lowest performance level was social accountability (mean=1.91 and 1.98, respectively). Practical implications Healthcare managers should focus on patient viewpoints and apply patient comments to solve problems, improve service quality and patient satisfaction. Originality/value The authors applied an IPA questionnaire to measure service quality provided to surgical and medical ward patients. This method identifies and corrects service quality shortcomings and improving service recipient perceptions.

  15. Seven Ways to Make Your Training Department One of the Best.

    ERIC Educational Resources Information Center

    Vander Linde, Karen; And Others

    1997-01-01

    Explains how training organizations in high-performance companies such as Motorola are different from those in low-performing ones. Identifies management practices: customer focus, training closer to customers, leadership, employee involvement, innovation, process improvement, improvement measurement, and change management. (JOW)

  16. Validation of a Quality Management Metric

    DTIC Science & Technology

    2000-09-01

    quality management metric (QMM) was used to measure the performance of ten software managers on Department of Defense (DoD) software development programs. Informal verification and validation of the metric compared the QMM score to an overall program success score for the entire program and yielded positive correlation. The results of applying the QMM can be used to characterize the quality of software management and can serve as a template to improve software management performance. Future work includes further refining the QMM, applying the QMM scores to provide feedback

  17. Application of data mining in performance measures

    NASA Astrophysics Data System (ADS)

    Chan, Michael F. S.; Chung, Walter W.; Wong, Tai Sun

    2001-10-01

    This paper proposes a structured framework for exploiting data mining application for performance measures. The context is set in an airline company is illustrated for the use of such framework. The framework takes in consideration of how a knowledge worker interacts with performance information at the enterprise level to support them to make informed decision in managing the effectiveness of operations. A case study of applying data mining technology for performance data in an airline company is illustrated. The use of performance measures is specifically applied to assist in the aircraft delay management process. The increasingly dispersed and complex operations of airline operation put much strain on the part of knowledge worker in using search, acquiring and analyzing information to manage performance. One major problem faced with knowledge workers is the identification of root causes of performance deficiency. The large amount of factors involved in the analyze the root causes can be time consuming and the objective of applying data mining technology is to reduce the time and resources needed for such process. The increasing market competition for better performance management in various industries gives rises to need of the intelligent use of data. Because of this, the framework proposed here is very much generalizable to industries such as manufacturing. It could assist knowledge workers who are constantly looking for ways to improve operation effectiveness through new initiatives and the effort is required to be quickly done to gain competitive advantage in the marketplace.

  18. 10 CFR 1.35 - Office of Information Services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... are managed in a manner consistent with Federal information resources management (IRM) laws and regulations; (c) Assists senior management in recognizing where information technology can add value while... information technology and information management programs based on applicable performance measures and...

  19. 10 CFR 1.35 - Office of Information Services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... are managed in a manner consistent with Federal information resources management (IRM) laws and regulations; (c) Assists senior management in recognizing where information technology can add value while... information technology and information management programs based on applicable performance measures and...

  20. 10 CFR 1.35 - Office of Information Services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... are managed in a manner consistent with Federal information resources management (IRM) laws and regulations; (c) Assists senior management in recognizing where information technology can add value while... information technology and information management programs based on applicable performance measures and...

  1. 10 CFR 1.35 - Office of Information Services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... are managed in a manner consistent with Federal information resources management (IRM) laws and regulations; (c) Assists senior management in recognizing where information technology can add value while... information technology and information management programs based on applicable performance measures and...

  2. 10 CFR 1.35 - Office of Information Services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... are managed in a manner consistent with Federal information resources management (IRM) laws and regulations; (c) Assists senior management in recognizing where information technology can add value while... information technology and information management programs based on applicable performance measures and...

  3. Ability of physicians to diagnose and manage illness due to category A bioterrorism agents.

    PubMed

    Cosgrove, Sara E; Perl, Trish M; Song, Xiaoyan; Sisson, Stephen D

    2005-09-26

    Early recognition of a terrorist attack with biologic agents will rely on physician diagnosis. Physicians' ability to diagnose and care for patients presenting after a bioterror event is unknown. The role of online case-based didactics to measure and improve knowledge in the diagnosis and treatment of these patients is unknown. A multicenter online educational intervention was completed by 631 physicians at 30 internal medicine residency programs in 16 states and Washington, DC, between July 1, 2003, and June 10, 2004. Participants completed a pretest, assessing ability to diagnose and manage potential cases of smallpox, anthrax, botulism, and plague. A didactic module reviewing diagnosis and management of these diseases was then completed, followed by a posttest. Pretest performance measured baseline knowledge. Posttest performance compared with pretest performance measured effectiveness of the educational intervention. Results were compared based on year of training and geographic location of the residency program. Correct diagnoses of diseases due to bioterrorism agents were as follows: smallpox, 50.7%; anthrax, 70.5%; botulism, 49.6%; and plague, 16.3% (average, 46.8%). Correct diagnosis averaged 79.0% after completing the didactic module (P<.001). Correct management of smallpox was 14.6%; anthrax, 17.0%; botulism, 60.2%; and plague, 9.7% (average, 25.4%). Correct management averaged 79.1% after completing the didactic module (P<.001). Performance did not differ based on year of training (P = .54) or geographic location (P = .64). Attending physicians performed better than residents (P<.001). Physician diagnosis and management of diseases caused by bioterrorism agents is poor. An online didactic module may improve diagnosis and management of diseases caused by these agents.

  4. Developing a Three Processes Framework to Analyze Hydrologic Performance of Urban Stormwater Management in a Watershed Scale

    NASA Astrophysics Data System (ADS)

    Lyu, H.; Ni, G.; Sun, T.

    2016-12-01

    Urban stormwater management contributes to recover water cycle to a nearly natural situation. It is a challenge for analyzing the hydrologic performance in a watershed scale, since the measures are various of sorts and scales and work in different processes. A three processes framework is developed to simplify the urban hydrologic process on the surface and evaluate the urban stormwater management. The three processes include source utilization, transfer regulation and terminal detention, by which the stormwater is controlled in order or discharged. Methods for analyzing performance are based on the water controlled proportions by each process, which are calculated using USEPA Stormwater Management Model. A case study form Beijing is used to illustrate how the performance varies under a set of designed events of different return periods. This framework provides a method to assess urban stormwater management as a whole system considering the interaction between measures, and to examine if there is any weak process of an urban watershed to be improved. The results help to make better solutions of urban water crisis.

  5. Benchmarking, Total Quality Management, and Libraries.

    ERIC Educational Resources Information Center

    Shaughnessy, Thomas W.

    1993-01-01

    Discussion of the use of Total Quality Management (TQM) in higher education and academic libraries focuses on the identification, collection, and use of reliable data. Methods for measuring quality, including benchmarking, are described; performance measures are considered; and benchmarking techniques are examined. (11 references) (MES)

  6. The "wins" of change: evaluating the impact of predicted changes on case management practice.

    PubMed

    Stanton, Marietta P; Barnett Lammon, Carol Ann

    2008-01-01

    A variety of strategies were employed to identify current and future trends that would impact the practice of case management. Historical review, consultation with case management experts, literature review, and environmental scanning by practicing case managers were strategies employed to determine the impact of current and future trends on case management. The trends identified in this article have implications for case managers in a variety of settings. Case managers participating in the environmental scanning process to evaluate the impact of the identified trends on their organization included representation from acute care, home care, behavioral health, workers' compensation, and private insurance settings. The top 7 trends identified by experts in the field of case management included pay for performance, recovery audit contractors, Medicare demonstration projects, transitions of care, informatics in healthcare and case management, metrics for case management, and the impact of an aging population in case management. Practicing case managers were asked to react to these trends in terms of likelihood of occurrence in their organization and impact of these trends on their case management practice. Case management will ultimately have a higher degree of accountability for its practice if metrics to evaluate and reimbursement for case management become a reality. A multitude of performance measures exist that will be monitored and be tied to reimbursement. To ensure that agencies are accomplishing these performance measures, case management will potentially have a growing importance. Case managers perceive that these trends have a predominantly positive impact on case management.

  7. Research performance measures and program evaluation.

    DOT National Transportation Integrated Search

    2003-10-01

    The Iowa Department of Transportation hosted a Peer Exchange on October 8-9, 2003. The : purpose of this exchange was to give research managers from several state departments of : transportation the opportunity to discuss research performance measure...

  8. The association between quality of care and the intensity of diabetes disease management programs.

    PubMed

    Mangione, Carol M; Gerzoff, Robert B; Williamson, David F; Steers, W Neil; Kerr, Eve A; Brown, Arleen F; Waitzfelder, Beth E; Marrero, David G; Dudley, R Adams; Kim, Catherine; Herman, William; Thompson, Theodore J; Safford, Monika M; Selby, Joe V

    2006-07-18

    Although disease management programs are widely implemented, little is known about their effectiveness. To determine whether disease management by physician groups is associated with diabetes care processes, control of intermediate outcomes, or the amount of medication used when intermediate outcomes are above target levels. Cross-sectional study. Patients were randomly sampled from 63 physician groups nested in 7 health plans sponsored by Translating Research into Action for Diabetes (87%) and from 4 health plans with individual physician contracts (13%). 8661 adults with diabetes who completed a survey (2000-2001) and had medical record data. Physician group and health plan directors described their organizations' use of physician reminders, performance feedback, and structured care management on a survey; their responses were used to determine measures of intensity of disease management. The current study measured 8 processes of care, including most recent hemoglobin A1c level, systolic blood pressure, serum low-density lipoprotein cholesterol level, and several measures of medication use. Increased use of any of 3 disease management strategies was significantly associated with higher adjusted rates of retinal screening, nephropathy screening, foot examinations, and measurement of hemoglobin A1c levels. Serum lipid level testing and influenza vaccine administration were associated with greater use of structured care management and performance feedback. Greater use of performance feedback correlated with an increased rate of foot examinations (difference, 5 percentage points [95% CI, 1 to 8 percentage points]), and greater use of physician reminders was associated with an increased rate of nephropathy screening (difference, 15 percentage points [CI, 6 to 23 percentage points]). No strategies were associated with intermediate outcome levels or level of medication management. Physician groups were not randomly sampled from population-based listings, and disease management strategies were not randomly allocated across groups. Disease management strategies were associated with better processes of diabetes care but not with improved intermediate outcomes or level of medication management. A greater focus on direct measurement, feedback, and reporting of intermediate outcome levels or of level of medication management may enhance the effectiveness of these programs.

  9. 48 CFR 1334.201-70 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... criticality, or risk potential. (b) If a project manager considers the use of an EVMS to be necessary for a... the Department's Information Technology Investment Performance Measurement and Performance Reporting Policy, the use of an Earned Value Management System (EVMS) is required for major acquisitions for...

  10. Attachment at work and performance.

    PubMed

    Neustadt, Elizabeth A; Chamorro-Premuzic, Tomas; Furnham, Adrian

    2011-09-01

    This paper examines the relations between self-reported attachment orientation at work and personality, self-esteem, trait emotional intelligence (aka emotional self-efficacy), and independently assessed career potential and job performance. Self-report data were collected from 211 managers in an international business in the hospitality industry; independent assessments of these managers' job performance and career potential were separately obtained from the organization. A self-report measure of romantic attachment was adapted for application in the work context; a two-factor solution was found for this measure. Secure/autonomous attachment orientation at work was positively related to self-esteem, trait emotional intelligence, extraversion, agreeableness, and conscientiousness, and also to job performance. Not only was secure/autonomous attachment orientation at work statistically predictive of job performance, but the new measure also made a distinct contribution, beyond conscientiousness, to this prediction.

  11. Improving educational objectives of the Industrial and Management Systems Engineering programme at Kuwait University

    NASA Astrophysics Data System (ADS)

    Aldowaisan, Tariq; Allahverdi, Ali

    2016-05-01

    This paper describes the process of developing programme educational objectives (PEOs) for the Industrial and Management Systems Engineering programme at Kuwait University, and the process of deployment of these PEOs. Input of the four constituents of the programme, faculty, students, alumni, and employers, is incorporated in the development and update of the PEOs. For each PEO an assessment process is employed where performance measures are defined along with target attainment levels. Results from assessment tools are compared with the target attainment levels to measure performance with regard to the PEOs. The assessment indicates that the results meet or exceed the target attainment levels of the PEOs' performance measures.

  12. Impact tests of crash energy management passenger rail cars: analysis and structural measurements

    DOT National Transportation Integrated Search

    2004-11-13

    Two full-scale impact tests were conducted to measure the : crashworthiness performance of Crash Energy Management : (CEM) passenger rail cars. On December 3, 2003 a single car : impacted a fixed barrier at approximately 35 mph and on : February 26, ...

  13. Evaluating the Impact of Classroom Education on the Management of Septic Shock Using Human Patient Simulation.

    PubMed

    Lighthall, Geoffrey K; Bahmani, Dona; Gaba, David

    2016-02-01

    Classroom lectures are the mainstay of imparting knowledge in a structured manner and have the additional goals of stimulating critical thinking, lifelong learning, and improvements in patient care. The impact of lectures on patient care is difficult to examine in critical care because of the heterogeneity in patient conditions and personnel as well as confounders such as time pressure, interruptions, fatigue, and nonstandardized observation methods. The critical care environment was recreated in a simulation laboratory using a high-fidelity mannequin simulator, where a mannequin simulator with a standardized script for septic shock was presented to trainees. The reproducibility of this patient and associated conditions allowed the evaluation of "clinical performance" in the management of septic shock. In a previous study, we developed and validated tools for the quantitative analysis of house staff managing septic shock simulations. In the present analysis, we examined whether measures of clinical performance were improved in those cases where a lecture on the management of shock preceded a simulated exercise on the management of septic shock. The administration of the septic shock simulations allowed for performance measurements to be calculated for both medical interns and for subsequent management by a larger resident-led team. The analysis revealed that receiving a lecture on shock before managing a simulated patient with septic shock did not produce scores higher than for those who did not receive the previous lecture. This result was similar for both interns managing the patient and for subsequent management by a resident-led team. We failed to find an immediate impact on clinical performance in simulations of septic shock after a lecture on the management of this syndrome. Lectures are likely not a reliable sole method for improving clinical performance in the management of complex disease processes.

  14. Parents' self-efficacy, outcome expectations, and self-reported task performance when managing atopic dermatitis in children: instrument reliability and validity.

    PubMed

    Mitchell, Amy E; Fraser, Jennifer A

    2011-02-01

    Support and education for parents faced with managing a child with atopic dermatitis is crucial to the success of current treatments. Interventions aiming to improve parent management of this condition are promising. Unfortunately, evaluation is hampered by lack of precise research tools to measure change. To develop a suite of valid and reliable research instruments to appraise parents' self-efficacy for performing atopic dermatitis management tasks; outcome expectations of performing management tasks; and self-reported task performance in a community sample of parents of children with atopic dermatitis. The Parents' Eczema Management Scale (PEMS) and the Parents' Outcome Expectations of Eczema Management Scale (POEEMS) were developed from an existing self-efficacy scale, the Parental Self-Efficacy with Eczema Care Index (PASECI). Each scale was presented in a single self-administered questionnaire, to measure self-efficacy, outcome expectations, and self-reported task performance related to managing child atopic dermatitis. Each was tested with a community sample of parents of children with atopic dermatitis, and psychometric evaluation of the scales' reliability and validity was conducted. A community-based convenience sample of 120 parents of children with atopic dermatitis completed the self-administered questionnaire. Participants were recruited through schools across Australia. Satisfactory internal consistency and test-retest reliability was demonstrated for all three scales. Construct validity was satisfactory, with positive relationships between self-efficacy for managing atopic dermatitis and general perceived self-efficacy; self-efficacy for managing atopic dermatitis and self-reported task performance; and self-efficacy for managing atopic dermatitis and outcome expectations. Factor analyses revealed two-factor structures for PEMS and PASECI alike, with both scales containing factors related to performing routine management tasks, and managing the child's symptoms and behaviour. Factor analysis was also applied to POEEMS resulting in a three-factor structure. Factors relating to independent management of atopic dermatitis by the parent, involving healthcare professionals in management, and involving the child in the management of atopic dermatitis were found. Parents' self-efficacy and outcome expectations had a significant influence on self-reported task performance. Findings suggest that PEMS and POEEMS are valid and reliable instruments worthy of further psychometric evaluation. Likewise, validity and reliability of PASECI was confirmed. Copyright © 2010 Elsevier Ltd. All rights reserved.

  15. Family physicians' ability to perform population management is associated with adoption of other aspects of the patient-centered medical home.

    PubMed

    Ottmar, Jessica; Blackburn, Brenna; Phillips, Robert L; Peterson, Lars E; Jaén, Carlos Roberto

    2015-04-01

    The patient-centered medical home (PCMH) model is considered a promising approach to improving population health, but how elements of these advanced practice models relate to population health capability is unknown. To measure associations between family physicians' performance of population management with PCMH components, a cross-sectional survey was conducted with physicians accessing the American Board of Family Medicine Web site in 2011. Bivariate analysis and logistic regression tested associations between physician and practice demographics and specific PCMH features. The primary outcome was performance of population management. The final sample included 3855 physicians, 37.3% of whom reported performing population management. Demographic characteristics significantly associated with greater use of population management were female sex and graduation from an international medical school. PCMH components that remained associated with population management after adjustment were access to clinical case managers (odds ratio [OR]=2.01, 95% confidence interval [95% CI]: 1.69, 2.39), behavioral health collaboration (OR=1.49, 95% CI: 1.26, 1.77), having an electronic health record that supports meaningful use (OR=1.47, 95% CI: 1.25, 1.74), recent participation in a quality improvement project (OR=2.47, 95% CI: 2.12, 2.89), and routine measurement of patient difficulty securing an appointment (OR=2.87, 95% CI: 2.45, 3.37). Performance of population management was associated with several PCMH elements and resources not present in traditional primary care offices. Attention to these elements likely will enhance delivery of population management services in primary care.

  16. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  17. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... in the communication of the success of improvements to other management and operating contractors in... management and operation of the contract. This may entail the alteration of existing practices or the... approaches consistent with the statement of work and performance measures of this contract. (b) The...

  18. Benchmark for Strategic Performance Improvement.

    ERIC Educational Resources Information Center

    Gohlke, Annette

    1997-01-01

    Explains benchmarking, a total quality management tool used to measure and compare the work processes in a library with those in other libraries to increase library performance. Topics include the main groups of upper management, clients, and staff; critical success factors for each group; and benefits of benchmarking. (Author/LRW)

  19. Incentive regulation and performance measurement of the Portuguese solid waste management services.

    PubMed

    Marques, Rui Cunha; Simões, Pedro

    2009-03-01

    Measuring the performance of solid waste management services usually uncovers very high potential for gains in efficiency and productivity. This circumstance occurs, naturally, due to the fact that these services are outside the market and because they are subjected to various market failures in their organizational framework. The aim of this study was to examine the Portuguese regulatory model and to measure the performance of the Portuguese solid waste management services in order to identify the major reforms carried out and their outcomes. As a first objective, the sunshine regulatory approach adopted in Portugal, in which performance comparison and its public discussion are the main tools, was investigated. The second objective was to compute the efficiency of the Portuguese solid waste management services by means of the non-parametric technique of data envelopment analysis (DEA), evaluating the Portuguese regulatory model and the existing market structure, as well as the influence of the operational environment on efficiency. The benchmarking frontier technique of DEA is particularly useful in the efficiency measurement of public utilities, in which knowledge of the production function is relatively scarce. Several DEA models were used and they all depicted significant inefficiency. The study also proved that efficiency did not depend on ownership (public or private) and that there was no difference in efficiency between the players, irrespective of whether they were regulated or not.

  20. The Performance Blueprint: An Integrated Logic Model Developed To Enhance Performance Measurement Literacy: The Case of Performance-Based Contract Management.

    ERIC Educational Resources Information Center

    Longo, Paul J.

    This study explored the mechanics of using an enhanced, comprehensive multipurpose logic model, the Performance Blueprint, as a means of building evaluation capacity, referred to in this paper as performance measurement literacy, to facilitate the attainment of both service-delivery oriented and community-oriented outcomes. The application of this…

  1. The effects of Crew Resource Mangement (CRM) training in airline maintenance: Results following three years' experience

    NASA Technical Reports Server (NTRS)

    Taylor, J. C.; Robertson, M. M.

    1995-01-01

    This report describes three years' evaluation of the effects of one airline's Crew Resources Management (CRM) training operation for maintenance. This evaluation focuses on the post-training attitudes of maintenance managers' and technical support professionals, their reported behaviors, and the safety, efficiency and dependable maintenance performance of their units. The results reveal a strong positive effect of the training. The overall program represents the use of CRM training as a long-term commitment to improving performance through effective communication at all levels in airline maintenance operations. The initial findings described in our previous progress reports are reinforced and elaborated here. The current results benefit from the entire pre-post training survey, which now represents total attendance of all managers and staff professionals. Additionally there are now full results from the two-month, six-month, and 12-month follow-up questionnaires, together with as many as 33 months of post-training performance data, using several indicators. In this present report, we examine participants' attitudes, their reported behaviors following the training, the performance of their work units, and the relationships among these variables. Attitudes include those measured immediately before and after the training as well as participants' attitudes months after their training. Performance includes measures, by work units, of on-time flight departures, on-schedule maintenance releases, occupational and aircraft safety, and efficient labor costs. We report changes in these performance measures following training, as well their relationships with the training participants' attitudes. Highlights of results from this training program include increased safety and improved costs associated with positive attitudes about the use of more assertive communication, and the improved management of stress. Improved on-time performance is also related to those improved attitudes, as well as favorable attitudes about participative management.

  2. Scale development of safety management system evaluation for the airline industry.

    PubMed

    Chen, Ching-Fu; Chen, Shu-Chuan

    2012-07-01

    The airline industry relies on the implementation of Safety Management System (SMS) to integrate safety policies and augment safety performance at both organizational and individual levels. Although there are various degrees of SMS implementation in practice, a comprehensive scale measuring the essential dimensions of SMS is still lacking. This paper thus aims to develop an SMS measurement scale from the perspective of aviation experts and airline managers to evaluate the performance of company's safety management system, by adopting Schwab's (1980) three-stage scale development procedure. The results reveal a five-factor structure consisting of 23 items. The five factors include documentation and commands, safety promotion and training, executive management commitment, emergency preparedness and response plan and safety management policy. The implications of this SMS evaluation scale for practitioners and future research are discussed. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. Lessons Learned from Military Performance Assessment.

    ERIC Educational Resources Information Center

    Wise, Lauress L.

    Lessons derived from the Job Performance Measurement (JPM) Project, which is overseen by the Office of the Assistant Secretary of Defense for Force Management and Personnel, for educational assessment are explored. The JPM Project was initiated to develop high fidelity measures of performance on the job that can be used to evaluate personnel…

  4. A Prototype Tool to Enable Farmers to Measure and Improve the Welfare Performance of the Farm Animal Enterprise: The Unified Field Index

    PubMed Central

    Colditz, Ian G.; Ferguson, Drewe M.; Collins, Teresa; Matthews, Lindsay; Hemsworth, Paul H.

    2014-01-01

    Simple Summary Benchmarking is a tool widely used in agricultural industries that harnesses the experience of farmers to generate knowledge of practices that lead to better on-farm productivity and performance. We propose, by analogy with production performance, a method for measuring the animal welfare performance of an enterprise and describe a tool for farmers to monitor and improve the animal welfare performance of their business. A general framework is outlined for assessing and monitoring risks to animal welfare based on measures of animals, the environment they are kept in and how they are managed. The tool would enable farmers to continually improve animal welfare. Abstract Schemes for the assessment of farm animal welfare and assurance of welfare standards have proliferated in recent years. An acknowledged short-coming has been the lack of impact of these schemes on the welfare standards achieved on farm due in part to sociological factors concerning their implementation. Here we propose the concept of welfare performance based on a broad set of performance attributes of an enterprise and describe a tool based on risk assessment and benchmarking methods for measuring and managing welfare performance. The tool termed the Unified Field Index is presented in a general form comprising three modules addressing animal, resource, and management factors. Domains within these modules accommodate the principle conceptual perspectives for welfare assessment: biological functioning; emotional states; and naturalness. Pan-enterprise analysis in any livestock sector could be used to benchmark welfare performance of individual enterprises and also provide statistics of welfare performance for the livestock sector. An advantage of this concept of welfare performance is its use of continuous scales of measurement rather than traditional pass/fail measures. Through the feedback provided via benchmarking, the tool should help farmers better engage in on-going improvement of farm practices that affect animal welfare. PMID:26480317

  5. Managing employee performance.

    PubMed

    McConnell, Charles R

    2004-01-01

    Performance management consists of significantly more than periodic evaluation of performance. It is the art and science of dealing with employees in a manner intended to positively influence their thinking and behavior to achieve a desired level of performance. It is essential for the manager to always model positive behavior concerning performance; what one does or says as a manager always has an influence on others. The kinds of employee behavior most likely encountered relative to performance management efforts stem from resistance to change and lack of complete understanding of what is expected. Employee participation must be elicited whenever possible for performance improvement; as far as the inner working details of a specific job are concerned, there is no one who knows the job better than the person who does it everyday. For each task to be done, an employee needs to know what output is expected, how this output will be measured, and what standards are applied in assessing the output. Managing employee performance requires ongoing contact with each employee, regular feedback, and whatever coaching, counseling, and training are necessary to bring an employee back on track when a problem appears. Sustaining efficient and effective employee performance requires the manager's ongoing attention and involvement.

  6. Performance Analysis of Hospital Managers Using Fuzzy AHP and Fuzzy TOPSIS: Iranian Experience.

    PubMed

    Shafii, Milad; Hosseini, Seyed Mostafa; Arab, Mohammad; Asgharizadeh, Ezzatollah; Farzianpour, Fereshteh

    2015-06-12

    Hospitals are complex organizations that require strong and effective management. The success of such organizations depends on the performance of managers. This study provides a comprehensive set of indicators to assess the performance of hospital managers in Iranian Ministry of Health owned hospitals. This research was a cross-sectional study. First, reviewing the literature and using experts' viewpoints and convening a panel of experts, the dimensions of performance have been selected and came in the form of a performance model. Then, using Fuzzy Analytic Hierarchy Process (FAHP), the chosen dimensions were weighted. Finally, based on the weighted performance dimensions, a questionnaire was designed and after confirming the reliability and validity, through a census, 407 senior and middle managers from 10 hospitals in Yazd, Iran completed it and performance of CEOs in these hospitals was evaluated using the Fuzzy Technique for Order Preference by Similarity Ideal Solution (FTOPSIS). To measure the performance of hospital managers, a performance assessment model consisted of 19 sub-dimensions in 5 main dimensions (Functional, Professional, Organizational, Individual and Human) was developed. The functional area had the most weight and the individual area had the least weight, as well. The hospital managers had different performance levels in each category and sub-dimensions. In terms of overall performance, the hospital managers C and H had the best and the worst performance, respectively. The use of appropriate dimensions for performance, prioritizing them and evaluating the performance of hospital managers using appropriate techniques, can play an effective role in the selection of qualified managers, identifying strengths and weaknesses in performance and continuous improvement of them.

  7. Social Technologies in Shipbuilding Workshop

    DTIC Science & Technology

    1983-05-01

    Study Discussion 31 Employee -managed Work Redesign 33 Behavior Modification: Performance Management 36 Discussion 37 Supporting & Sustaining Change in...found, however, that these distinctly Japanese social organizational variables have less causal impact on performance than do the more universal social...production figures and might even share the information with his employees . This, to be sure, is measure- ment and feedback — but not in the Performance

  8. Testing the Feasibility of a Low-Cost Network Performance Measurement Infrastructure

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chevalier, Scott; Schopf, Jennifer M.; Miller, Kenneth

    2016-07-01

    Todays science collaborations depend on reliable, high performance networks, but monitoring the end-to-end performance of a network can be costly and difficult. The most accurate approaches involve using measurement equipment in many locations, which can be both expensive and difficult to manage due to immobile or complicated assets. The perfSONAR framework facilitates network measurement making management of the tests more reasonable. Traditional deployments have used over-provisioned servers, which can be expensive to deploy and maintain. As scientific network uses proliferate, there is a desire to instrument more facets of a network to better understand trends. This work explores low costmore » alternatives to assist with network measurement. Benefits include the ability to deploy more resources quickly, and reduced capital and operating expenditures. Finally, we present candidate platforms and a testing scenario that evaluated the relative merits of four types of small form factor equipment to deliver accurate performance measurements.« less

  9. Benchmarking and Performance Measurement.

    ERIC Educational Resources Information Center

    Town, J. Stephen

    This paper defines benchmarking and its relationship to quality management, describes a project which applied the technique in a library context, and explores the relationship between performance measurement and benchmarking. Numerous benchmarking methods contain similar elements: deciding what to benchmark; identifying partners; gathering…

  10. Relationship between Managers' Performance and Organizational Health

    ERIC Educational Resources Information Center

    Mohammadisadr, Mohammad; Siadat, Seyyedali; Arbabisarjou, Azizollah

    2012-01-01

    The main purpose of this paper is to study the relationship between managers' performance in the field of interpersonal, informational and decision-making tasks with organizational health. To measure the indicators of the model, a questionnaire was prepared and distributed among 113 company of Tehran stock Exchange Market. According to the…

  11. Is having quality as an item on the executive board agenda associated with the implementation of quality management systems in European hospitals: a quantitative analysis

    PubMed Central

    Botje, Daan; Klazinga, N.S.; Suñol, R.; Groene, O.; Pfaff, H.; Mannion, R.; Depaigne-Loth, A.; Arah, O.A.; Dersarkissian, M.; Wagner, C.; Klazinga, N.; Kringos, D.S.; Lombarts, M.J.M.H.; Plochg, T.; Lopez, M.A.; Vallejo, P.; Saillour-Glenisson, F.; Car, M.; Jones, S.; Klaus, E.; Bottaro, S.; Garel, P.; Saluvan, M.; Bruneau, C.; Depaigne-Loth, A.; Hammer, A.; Ommen, O.; Pfaff, H.; Botje, D.; Escoval, A.; Lívio, A.; Eiras, M.; Franca, M.; Leite, I.; Almeman, F.; Kus, H.; Ozturk, K.; Mannion, R.; Wang, A.; Thompson, A.

    2014-01-01

    Objective To assess whether there is a relationship between having quality as an item on the board's agenda, perceived external pressure (PEP) and the implementation of quality management in European hospitals. Design A quantitative, mixed method, cross-sectional study in seven European countries in 2011 surveying CEOs and quality managers and data from onsite audits. Participants One hundred and fifty-five CEOs and 155 quality managers. Setting One hundred and fifty-five randomly selected acute care hospitals in seven European countries (Czech Republic, France, Germany, Poland, Portugal, Spain and Turkey). Main outcome measure(s) Three constructs reflecting quality management based on questionnaire and audit data: (i) Quality Management System Index, (ii) Quality Management Compliance Index and (iii) Clinical Quality Implementation Index. The main predictor was whether quality performance was on the executive board's agenda. Results Discussing quality performance at executive board meetings more often was associated with a higher quality management system score (regression coefficient b = 2.53; SE = 1.16; P = 0.030). We found a trend in the associations of discussing quality performance with quality compliance and clinical quality implementation. PEP did not modify these relationships. Conclusions Having quality as an item on the executive board's agenda allows them to review and discuss quality performance more often in order to improve their hospital's quality management. Generally, and as this study found, having quality on the executive board's agenda matters. PMID:24550260

  12. Is having quality as an item on the executive board agenda associated with the implementation of quality management systems in European hospitals: a quantitative analysis.

    PubMed

    Botje, Daan; Klazinga, N S; Suñol, R; Groene, O; Pfaff, H; Mannion, R; Depaigne-Loth, A; Arah, O A; Dersarkissian, M; Wagner, C

    2014-04-01

    To assess whether there is a relationship between having quality as an item on the board's agenda, perceived external pressure (PEP) and the implementation of quality management in European hospitals. A quantitative, mixed method, cross-sectional study in seven European countries in 2011 surveying CEOs and quality managers and data from onsite audits. One hundred and fifty-five CEOs and 155 quality managers. One hundred and fifty-five randomly selected acute care hospitals in seven European countries (Czech Republic, France, Germany, Poland, Portugal, Spain and Turkey). Main outcome measure(s) Three constructs reflecting quality management based on questionnaire and audit data: (i) Quality Management System Index, (ii) Quality Management Compliance Index and (iii) Clinical Quality Implementation Index. The main predictor was whether quality performance was on the executive board's agenda. Discussing quality performance at executive board meetings more often was associated with a higher quality management system score (regression coefficient b = 2.53; SE = 1.16; P = 0.030). We found a trend in the associations of discussing quality performance with quality compliance and clinical quality implementation. PEP did not modify these relationships. Having quality as an item on the executive board's agenda allows them to review and discuss quality performance more often in order to improve their hospital's quality management. Generally, and as this study found, having quality on the executive board's agenda matters.

  13. Phonomicrosurgery in singers and performing artists: treatment outcomes, management theories, and future directions.

    PubMed

    Zeitels, Steven M; Hillman, Robert E; Desloge, Rosemary; Mauri, Marcello; Doyle, Patricia B

    2002-12-01

    Phonomicrosurgery in performing artists has historically been approached with great trepidation, and vocal outcome data are sparse. The vocal liability of surgically disturbing the superficial lamina propria (SLP) and epithelium must be balanced with the inherent detrimental vocal effect of the lesion(s). A prospective investigation was performed on 185 performing artists who underwent phonomicrosurgical resection of 365 lesions: 201 nodules, 71 polyps, 66 varices and ectasias, 13 cysts, 8 keratotic lesions, 2 granulomas, 2 Reinke's edema, and 2 papillomas. Nearly all patients with SLP lesions reported improvement in their postsurgical vocal function. This subjective result was supported by objective acoustic and aerodynamic measures. All postsurgical objective vocal function measures fell within normal limits, including a few that displayed presurgical abnormalities. However, given the relative insensitivity of standard objective measures to assess higher-level vocal performance-related factors, it is even more noteworthy that 8 of 24 objective measures displayed statistically significant postsurgical improvements in vocal function. Such changes in objective measures mostly reflect overall enhancement in the efficiency of voice production. Phonomicrosurgical resection of vocal fold lesions in performing artists is enjoying an expanding role because of a variety of improvements in diagnostic assessment, surgical instrumentation and techniques, and specialized rehabilitation. Most of these lesions are the result of phonotrauma and arise within the SLP. Successful management depends on prudent patient selection and counseling, ultraprecise technique, and vigorqus vocal rehabilitation. Furthermore, an understanding of the vocal function and dysfunction of this high-performance population provides all otolaryngologists who manage laryngeal problems with valuable information that they can extrapolate for use in their practices.

  14. Association between quality management and performance indicators in Dutch diabetes care groups: a cross-sectional study.

    PubMed

    Campmans-Kuijpers, Marjo J E; Baan, Caroline A; Lemmens, Lidwien C; Klomp, Maarten L H; Romeijnders, Arnold C M; Rutten, Guy E H M

    2015-05-11

    To enhance the quality of diabetes care in the Netherlands, so-called care groups with three to 250 general practitioners emerged to organise and coordinate diabetes care. This introduced a new quality management level in addition to the quality management of separate general practices. We hypothesised that this new level of quality management might be associated with the aggregate performance indicators on the patient level. Therefore, we aimed to explore the association between quality management at the care group level and its aggregate performance indicators. A cross-sectional study. All Dutch care groups (n=97). 23 care groups provided aggregate register-based performance indicators of all their practices as well as data on quality management measured with a questionnaire filled out by 1 or 2 of their quality managers. The association between quality management, overall and in 6 domains ('organisation of care', 'multidisciplinary teamwork', 'patient centredness', 'performance management', 'quality improvement policy' and 'management strategies') on the one hand and 3 process indicators (the percentages of patients with at least 1 measurement of glycated haemoglobin, lipid profile and systolic blood pressure), and 3 intermediate outcome indicators (the percentages of patients with glycated haemoglobin below 53 mmol/mol (7%); low-density lipoprotein cholesterol below 2.5 mmol/L; and systolic blood pressure below 140 mm Hg) by weighted univariable linear regression. The domain 'management strategies' was significantly associated with the percentage of patients with a glycated haemoglobin <53 mmol/mol (β 0.28 (0.09; 0.46) p=0.01) after correction for multiple testing. The other domains as well as overall quality management were not associated with aggregate process or outcome indicators. This first exploratory study on quality management showed weak or no associations between quality management of diabetes care groups and their performance. It remains uncertain whether this second layer on quality management adds to better quality of care. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  15. Performance monitor system functional simulator, environmental data, orbiter 101(HFT)

    NASA Technical Reports Server (NTRS)

    Parker, F. W.

    1974-01-01

    Information concerning the environment component of the space shuttle performance monitor system simulator (PMSS) and those subsystems operational on the shuttle orbiter 101 used for horizontal flight test (HFT) is provided, along with detailed data for the shuttle performance monitor system (PMS) whose software requirements evolve from three basic PMS functions: (1) fault detection and annunciation; (2) subsystem measurement management; and (3) subsystem configuration management. Information relative to the design and operation of Orbiter systems for HFT is also presented, and the functional paths are identified to the lowest level at which the crew can control the system functions. Measurement requirements are given which are necessary to adequately monitor the health status of the system. PMS process requirements, relative to the measurements which are necessary for fault detection and annunciation of a failed functional path, consist of measurement characteristics, tolerance limits, precondition tests, and correlation measurements.

  16. Automating Performance Measures and Clinical Practice Guidelines: Differences and Complementarities.

    PubMed

    Tu, Samson W; Martins, Susana; Oshiro, Connie; Yuen, Kaeli; Wang, Dan; Robinson, Amy; Ashcraft, Michael; Heidenreich, Paul A; Goldstein, Mary K

    2016-01-01

    Through close analysis of two pairs of systems that implement the automated evaluation of performance measures (PMs) and guideline-based clinical decision support (CDS), we contrast differences in their knowledge encoding and necessary changes to a CDS system that provides management recommendations for patients failing performance measures. We trace the sources of differences to the implementation environments and goals of PMs and CDS.

  17. An Analysis of the Navy Regional Data Automation Center (NARDAC) chargeback System

    DTIC Science & Technology

    1986-09-01

    addition, operational control is concerned with performing predefined activities whereas management control relates to the organiza- tion’s goals and...In effect, the management control system monitors the progress of operations and alerts the "appropriate management level" when performance as measured...architecture, the financial control processes, and the audit function ( Brandon , 1978; Anderson, 1983). In an operating DP environment, however, non-financial

  18. Assessing the effect of increased managed care on hospitals.

    PubMed

    Mowll, C A

    1998-01-01

    This study uses a new relative risk methodology developed by the author to assess and compare certain performance indicators to determine a hospital's relative degree of financial vulnerability, based on its location, to the effects of increased managed care market penetration. The study also compares nine financial measures to determine whether hospital in states with a high degree of managed-care market penetration experience lower levels of profitability, liquidity, debt service, and overall viability than hospitals in low managed care states. A Managed Care Relative Financial Risk Assessment methodology composed of nine measures of hospital financial and utilization performance is used to develop a high managed care state Composite Index and to determine the Relative Financial Risk and the Overall Risk Ratio for hospitals in a particular state. Additionally, financial performance of hospitals in the five highest managed care states is compared to hospitals in the five lowest states. While data from Colorado and Massachusetts indicates that hospital profitability diminishes as the level of managed care market penetration increases, the overall study results indicate that hospitals in high managed care states demonstrate a better cash position and higher profitability than hospitals in low managed care states. Hospitals in high managed care states are, however, more heavily indebted in relation to equity and have a weaker debt service coverage capacity. Moreover, the overall financial health and viability of hospitals in high managed care states is superior to that of hospitals in low managed care states.

  19. Measuring Healthcare Providers' Performances Within Managed Competition Using Multidimensional Quality and Cost Indicators.

    PubMed

    Portrait, France R M; van der Galiën, Onno; Van den Berg, Bernard

    2016-04-01

    The Dutch healthcare system is in transition towards managed competition. In theory, a system of managed competition involves incentives for quality and efficiency of provided care. This is mainly because health insurers contract on behalf of their clients with healthcare providers on, potentially, quality and costs. The paper develops a strategy to comprehensively analyse available multidimensional data on quality and costs to assess and report on the relative performance of healthcare providers within managed competition. We had access to individual information on 2409 clients of 19 Dutch diabetes care groups on a broad range of (outcome and process related) quality and cost indicators. We carried out a cost-consequences analysis and corrected for differences in case mix to reduce incentives for risk selection by healthcare providers. There is substantial heterogeneity between diabetes care groups' performances as measured using multidimensional indicators on quality and costs. Better quality diabetes care can be achieved with lower or higher costs. Routine monitoring using multidimensional data on quality and costs merged at the individual level would allow a systematic and comprehensive analysis of healthcare providers' performances within managed competition. Copyright © 2015 John Wiley & Sons, Ltd.

  20. Civilian Workforce 2020: Strategies for Modernizing Human Resources Management in the Department of the Navy

    DTIC Science & Technology

    2000-08-18

    heavy reliance on contractors to perform much of the work performed by civilian employees . While this trend is expected to continue, a critical mass...manage, and, if necessary, terminate non- performing employees . Accountability measures should be clear and have consequences. ◆ Investments in human...complexity of work increas- es and the performance of industrial-type functions is shifted to contractors. The impact of this shift on the occupational

  1. Association between quality management and performance indicators in Dutch diabetes care groups: a cross-sectional study

    PubMed Central

    Campmans-Kuijpers, Marjo J E; Baan, Caroline A; Lemmens, Lidwien C; Klomp, Maarten L H; Romeijnders, Arnold C M; Rutten, Guy E H M

    2015-01-01

    Objectives To enhance the quality of diabetes care in the Netherlands, so-called care groups with three to 250 general practitioners emerged to organise and coordinate diabetes care. This introduced a new quality management level in addition to the quality management of separate general practices. We hypothesised that this new level of quality management might be associated with the aggregate performance indicators on the patient level. Therefore, we aimed to explore the association between quality management at the care group level and its aggregate performance indicators. Design A cross-sectional study. Setting All Dutch care groups (n=97). Participants 23 care groups provided aggregate register-based performance indicators of all their practices as well as data on quality management measured with a questionnaire filled out by 1 or 2 of their quality managers. Primary outcomes The association between quality management, overall and in 6 domains (‘organisation of care’, ‘multidisciplinary teamwork’, ‘patient centredness’, ‘performance management’, ‘quality improvement policy’ and ‘management strategies’) on the one hand and 3 process indicators (the percentages of patients with at least 1 measurement of glycated haemoglobin, lipid profile and systolic blood pressure), and 3 intermediate outcome indicators (the percentages of patients with glycated haemoglobin below 53 mmol/mol (7%); low-density lipoprotein cholesterol below 2.5 mmol/L; and systolic blood pressure below 140 mm Hg) by weighted univariable linear regression. Results The domain ‘management strategies’ was significantly associated with the percentage of patients with a glycated haemoglobin <53 mmol/mol (β 0.28 (0.09; 0.46) p=0.01) after correction for multiple testing. The other domains as well as overall quality management were not associated with aggregate process or outcome indicators. Conclusions This first exploratory study on quality management showed weak or no associations between quality management of diabetes care groups and their performance. It remains uncertain whether this second layer on quality management adds to better quality of care. PMID:25968001

  2. Constructing an adaptive care model for the management of disease-related symptoms throughout the course of multiple sclerosis--performance improvement CME.

    PubMed

    Miller, Aaron E; Cohen, Bruce A; Krieger, Stephen C; Markowitz, Clyde E; Mattson, David H; Tselentis, Helen N

    2014-01-01

    Symptom management remains a challenging clinical aspect of MS. To design a performance improvement continuing medical education (PI CME) activity for better clinical management of multiple sclerosis (MS)-related depression, fatigue, mobility impairment/falls, and spasticity. Ten volunteer MS centers participated in a three-stage PI CME model: A) baseline assessment; B) practice improvement CME intervention; C) reassessment. Expert faculty developed performance measures and activity intervention tools. Designated MS center champions reviewed patient charts and entered data into an online database. Stage C data were collected eight weeks after implementation of the intervention and compared with Stage A baseline data to measure change in performance. Aggregate data from the 10 participating MS centers (405 patient charts) revealed performance improvements in the assessment of all four MS-related symptoms. Statistically significant improvements were found in the documented assessment of mobility impairment/falls (p=0.003) and spasticity (p<0.001). For documentation of care plans, statistically significant improvements were reported for fatigue (p=0.007) and mobility impairment/falls (p=0.040); non-significant changes were noted for depression and spasticity. Our PI CME interventions demonstrated performance improvement in the management of MS-related symptoms. This PI CME model (available at www.achlpicme.org/ms/toolkit) offers a new perspective on enhancing symptom management in patients with MS.

  3. DOD Acquisition Information Management

    DTIC Science & Technology

    1994-09-30

    instead of on a real- time management information flow. The process of identifying risks and implementing corrective actions is lengthened by using the current system; performance measurement and reporting are impeded.

  4. CrossTalk: The Journal of Defense Software Engineering. Volume 21, Number 4

    DTIC Science & Technology

    2008-04-01

    stability characteristics to those extensively reported for the Cost Performance Index in Earned Value Management . by Kym Henderson and Dr. Ofer...Zwikael Schedule Adherence:A Useful Measure for Project Management This article utilizes the new practice of Earned Schedule to discuss a proposed...measure for further enhancing the practice of Earned Value Management . by Walt Lipke A Review of Boundary Value Analysis Techniques This article reviews

  5. Management Practices. U.S. Companies Improve Performance through Quality Efforts. Report to the Honorable Donald Ritter, House of Representatives.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. National Security and International Affairs Div.

    The General Accounting Office (GAO) examined the impact of formal total quality management (TQM) practices on the performance of 20 selected U.S. companies that were among the highest-scoring applicants in 1988 and 1989 for the Malcolm Baldridge National Quality Award. Several key indicators used by companies to measure performance were analyzed.…

  6. Research on the Countermeasures Based on TTPM Theory for the Improvement of the Basic Education Teachers Training Performance

    ERIC Educational Resources Information Center

    Huabai, Bu; Dengyu, Zhang; Xiuying, Shen; Hao, Tu

    2012-01-01

    Many elements of the basic education teachers' training performance are embedded in the training interaction and sharing, so the enhancement of the training performance needs a whole process management and control. Based on TTPM theory, this paper has put forward four measures that must be pay attention to during the management of the basic…

  7. Squaring the Project Management Circle: Updating the Cost, Schedule, and Performance Methodology

    DTIC Science & Technology

    2016-04-30

    success is measured as achieving technical performance and/or mission performance goals, coupled with customer (warfighter) satisfaction (De Wit, 1988...studies added criteria such as customer satisfaction , efficiency of execution, and effectiveness of the project organization (Pinto & Slevin, 1998...team and the user customer organization, management policy and project control. This clustering of success factors represents the amalgamation of the

  8. Six steps to an effective denials management program.

    PubMed

    Robertson, Brian; Doré, Alexander

    2005-09-01

    The following six steps can help you manage denials management issues in your organization: Create standard definitions of denial types. Establish a denial hierarchy. Establish a centralized denial database. Develop key performance indicators. Build responsibility matrices. Measure, monitor, and take action.

  9. Performance Measurement and Investment Objectives for Educational Endowment Funds.

    ERIC Educational Resources Information Center

    Williamson, J. Peter

    This book is one of a series of projects developed to increase understanding of the management of educational endowment funds. Specifics of performance measurement and the setting of objectives are emphasized. Part one deals with measurement of the rate of return, or profitability, of an endowment fund. Part two reviews some statistical measures…

  10. Innovative Way to Test Batteries Fills a Market Niche | News | NREL

    Science.gov Websites

    researchers, performs precise thermal measurements needed to design safer, longer-lasting, and more cost NREL researchers, are capable of performing the precise thermal measurements needed to make safer . Batteries cannot survive heat, and they need thermal management; IBCs are essential in measuring how much

  11. From mission to measures: performance measure development for a Teen Pregnancy Prevention Program.

    PubMed

    Farb, Amy Feldman; Burrus, Barri; Wallace, Ina F; Wilson, Ellen K; Peele, John E

    2014-03-01

    The Office of Adolescent Health (OAH) sought to create a comprehensive set of performance measures to capture the performance of the Teen Pregnancy Prevention (TPP) program. This performance measurement system needed to provide measures that could be used internally (by both OAH and the TPP grantees) for management and program improvement as well as externally to communicate the program's progress to other interested stakeholders and Congress. This article describes the selected measures and outlines the considerations behind the TPP measurement development process. Issues faced, challenges encountered, and lessons learned have broad applicability for other federal agencies and, specifically, for TPP programs interested in assessing their own performance and progress. Published by Elsevier Inc.

  12. Patient ratings of case managers in a medical home: associations with patient satisfaction and health care utilization.

    PubMed

    Jubelt, Lindsay E; Graham, Jove; Maeng, Daniel D; Li, Huilin; Epstein, Andrew J; Metlay, Joshua P

    2014-11-18

    Case managers are employed in medical homes to coordinate care for clinically complex patients. To measure the association of patient perceptions of case manager performance with overall satisfaction and subsequent health care utilization. Retrospective cohort study. Integrated health system in Pennsylvania. Members of the health system-owned health plan who 1) received primary care in the health system's clinics, 2) were exposed to clinic-embedded case managers, and 3) completed a survey of satisfaction with care. Survey assessment of case manager performance and overall satisfaction with care and claims-based assessment of case manager performance and subsequent hospitalizations or emergency department visits. Survey measures were dichotomized into very good versus less than very good. A total of 1755 patients (44%) completed the survey and 1415 met study criteria. Survey respondents who reported very good ratings of case manager performance across all items had a higher probability of reporting very good overall satisfaction with care (92.2% vs. 62.5%; P < 0.001) and had a lower incidence of subsequent emergency department visits (incidence rate ratio, 0.79 [95% CI, 0.64 to 0.98]; P = 0.029) but not hospitalizations (incidence rate ratio, 0.92 [CI, 0.75 to 1.11]; P = 0.37) up to 2 years after the survey compared with survey respondents who reported less-than-very good case manager performance on 1 or more questions on the survey. Satisfaction data demonstrated substantial ceiling effects. Survey nonresponse may have introduced bias in the results. Patients' favorable perceptions of case managers are associated with higher overall satisfaction with care and may lower risk for future acute care use. Robert Wood Johnson Foundation and the U.S. Department of Veterans Affairs.

  13. Designing Flood Management Systems for Joint Economic and Ecological Robustness

    NASA Astrophysics Data System (ADS)

    Spence, C. M.; Grantham, T.; Brown, C. M.; Poff, N. L.

    2015-12-01

    Freshwater ecosystems across the United States are threatened by hydrologic change caused by water management operations and non-stationary climate trends. Nonstationary hydrology also threatens flood management systems' performance. Ecosystem managers and flood risk managers need tools to design systems that achieve flood risk reduction objectives while sustaining ecosystem functions and services in an uncertain hydrologic future. Robust optimization is used in water resources engineering to guide system design under climate change uncertainty. Using principles introduced by Eco-Engineering Decision Scaling (EEDS), we extend robust optimization techniques to design flood management systems that meet both economic and ecological goals simultaneously across a broad range of future climate conditions. We use three alternative robustness indices to identify flood risk management solutions that preserve critical ecosystem functions in a case study from the Iowa River, where recent severe flooding has tested the limits of the existing flood management system. We seek design modifications to the system that both reduce expected cost of flood damage while increasing ecologically beneficial inundation of riparian floodplains across a wide range of plausible climate futures. The first robustness index measures robustness as the fraction of potential climate scenarios in which both engineering and ecological performance goals are met, implicitly weighting each climate scenario equally. The second index builds on the first by using climate projections to weight each climate scenario, prioritizing acceptable performance in climate scenarios most consistent with climate projections. The last index measures robustness as mean performance across all climate scenarios, but penalizes scenarios with worse performance than average, rewarding consistency. Results stemming from alternate robustness indices reflect implicit assumptions about attitudes toward risk and reveal the tradeoffs between using structural and non-structural flood management strategies to ensure economic and ecological robustness.

  14. Performance Analysis of Hospital Managers Using Fuzzy AHP and Fuzzy TOPSIS: Iranian Experience

    PubMed Central

    Shafii, Milad; Hosseini, Seyed Mostafa; Arab, Mohammad; Asgharizadeh, Ezzatollah; Farzianpour, Fereshteh

    2016-01-01

    Background and Objectives: Hospitals are complex organizations that require strong and effective management. The success of such organizations depends on the performance of managers. This study provides a comprehensive set of indicators to assess the performance of hospital managers in Iranian Ministry of Health owned hospitals. Methods: This research was a cross-sectional study. First, reviewing the literature and using experts’ viewpoints and convening a panel of experts, the dimensions of performance have been selected and came in the form of a performance model. Then, using Fuzzy Analytic Hierarchy Process (FAHP), the chosen dimensions were weighted. Finally, based on the weighted performance dimensions, a questionnaire was designed and after confirming the reliability and validity, through a census, 407 senior and middle managers from 10 hospitals in Yazd, Iran completed it and performance of CEOs in these hospitals was evaluated using the Fuzzy Technique for Order Preference by Similarity Ideal Solution (FTOPSIS). Results: To measure the performance of hospital managers, a performance assessment model consisted of 19 sub-dimensions in 5 main dimensions (Functional, Professional, Organizational, Individual and Human) was developed. The functional area had the most weight and the individual area had the least weight, as well. The hospital managers had different performance levels in each category and sub-dimensions. In terms of overall performance, the hospital managers C and H had the best and the worst performance, respectively. Conclusions: The use of appropriate dimensions for performance, prioritizing them and evaluating the performance of hospital managers using appropriate techniques, can play an effective role in the selection of qualified managers, identifying strengths and weaknesses in performance and continuous improvement of them. PMID:26383216

  15. Does hospital financial performance measure up?

    PubMed

    Cleverley, W O; Harvey, R K

    1992-05-01

    Comparisons are continuously being made between the financial performance, products and services, of the healthcare industry and those of non-healthcare industries. Several useful measures of financial performance--profitability, liquidity, financial risk, asset management and replacement, and debt capacity, are used by the authors to compare the financial performance of the hospital industry with that of the industrial, transportation and utility sectors. Hospitals exhibit weaknesses in several areas. Goals are suggested for each measure to bring hospitals closer to competitive levels.

  16. Improving Pediatric Rapid Response Team Performance Through Crew Resource Management Training of Team Leaders.

    PubMed

    Siems, Ashley; Cartron, Alexander; Watson, Anne; McCarter, Robert; Levin, Amanda

    2017-02-01

    Rapid response teams (RRTs) improve the detection of and response to deteriorating patients. Professional hierarchies and the multidisciplinary nature of RRTs hinder team performance. This study assessed whether an intervention involving crew resource management training of team leaders could improve team performance. In situ observations of RRT activations were performed pre- and post-training intervention. Team performance and dynamics were measured by observed adherence to an ideal task list and by the Team Emergency Assessment Measure tool, respectively. Multiple quartile (median) and logistic regression models were developed to evaluate change in performance scores or completion of specific tasks. Team leader and team introductions (40% to 90%, P = .004; 7% to 45%, P = .03), floor team presentations in Situation Background Assessment Recommendation format (20% to 65%, P = .01), and confirmation of the plan (7% to 70%, P = .002) improved after training in patients transferred to the ICU (n = 35). The Team Emergency Assessment Measure metric was improved in all 4 categories: leadership (2.5 to 3.5, P < .001), teamwork (2.7 to 3.7, P < .001), task management (2.9 to 3.8, P < .001), and global scores (6.0 to 9.0, P < .001) for teams caring for patients who required transfer to the ICU. Targeted crew resource management training of the team leader resulted in improved team performance and dynamics for patients requiring transfer to the ICU. The intervention demonstrated that training the team leader improved behavior in RRT members who were not trained. Copyright © 2017 by the American Academy of Pediatrics.

  17. Conceptualizing and communicating ecological river restoration: Chapter 2

    USGS Publications Warehouse

    Jacobson, Robert B.; Berkley, Jim

    2011-01-01

    We present a general conceptual model for communicating aspects of river restoration and management. The model is generic and adaptable to most riverine settings, independent of size. The model has separate categories of natural and social-economic drivers, and management actions are envisioned as modifiers of naturally dynamic systems. The model includes a decision-making structure in which managers, stakeholders, and scientists interact to define management objectives and performance evaluation. The model depicts a stress to the riverine ecosystem as either (1) deviation in the regimes (flow, sediment, temperature, light, biogeochemical, and genetic) by altering the frequency, magnitude, duration, timing, or rate of change of the fluxes or (2) imposition of a hard structural constraint on channel form. Restoration is depicted as naturalization of those regimes or removal of the constraint. The model recognizes the importance of river history in conditioning future responses. Three hierarchical tiers of essential ecosystem characteristics (EECs) illustrate how management actions typically propagate through physical/chemical processes to habitat to biotic responses. Uncertainty and expense in modeling or measuring responses increase in moving from tiers 1 to 3. Social-economic characteristics are shown in a parallel structure that emphasizes the need to quantify trade-offs between ecological and social-economic systems. Performance measures for EECs are also hierarchical, showing that selection of measures depend on participants’ willingness to accept uncertainty. The general form is of an adaptive management loop in which the performance measures are compared to reference conditions or success criteria and the information is fed back into the decision-making process.

  18. Measuring emergency physicians' work: factoring in clinical hours, patients seen, and relative value units into 1 metric.

    PubMed

    Silich, Bert A; Yang, James J

    2012-05-01

    Measuring workplace performance is important to emergency department management. If an unreliable model is used, the results will be inaccurate. Use of inaccurate results to make decisions, such as how to distribute the incentive pay, will lead to rewarding the wrong people and will potentially demoralize top performers. This article demonstrates a statistical model to reliably measure the work accomplished, which can then be used as a performance measurement.

  19. A Simulation-Based Approach for Teaching the Systems Perspective of Strategic Performance Management

    ERIC Educational Resources Information Center

    Capelo, Carlos; Lopes, Ana; Mata, Ana

    2015-01-01

    Kaplan and Norton introduced the balanced scorecard (BSC), which is based on a systems perspective of the business strategy and performance measurement. Many organisations around the world use the BSC to define, implement and manage strategy. Nevertheless, there are studies that identify problems and limitations associated with the implementation…

  20. Amenable Performance Management in Higher Education: Integrating Principles of Agency and Stewardship Theories

    ERIC Educational Resources Information Center

    Seyama, Sadi Mokhaneli

    2015-01-01

    The considerable transformation of higher education (HE), driven by the South African government's demand for accountability of resources for the attainment of its mandate has altered the "business" of academia. In response to the financial austerity measures, performance management (PM) systems have been implemented in South African HE…

  1. Systematic review: work-related stress and the HSE management standards.

    PubMed

    Brookes, K; Limbert, C; Deacy, C; O'Reilly, A; Scott, S; Thirlaway, K

    2013-10-01

    The Health and Safety Executive (HSE) has defined six management standards representing aspects of work that, if poorly managed, are associated with lower levels of employee health and productivity, and increased sickness absence. The HSE indicator tool aims to measure organizations' performance in managing the primary stressors identified by the HSE management standards. The aims of the study are to explore how the HSE indicator tool has been implemented within organizations and to identify contexts in which the tool has been used, its psychometric properties and relationships with alternative measures of well-being and stress. Studies that matched specific criteria were included in the review. Abstracts were considered by two researchers to ensure a reliable process. Full texts were obtained when abstracts met the inclusion criteria. Thirteen papers were included in the review. Using factor analysis and measures of reliability, the studies suggest that the HSE indicator tool is a psychometrically sound measure. The tool has been used to measure work-related stress across different occupational groups, with a clear relationship between the HSE tool and alternative measures of well-being. Limitations of the tool and recommendations for future research are discussed. The HSE indicator tool is a psychometrically sound measure of organizational performance against the HSE management standards. As such it can provide a broad overview of sources of work-related stress within organizations. More research is required to explore the use of the tool in the design of interventions to reduce stress, and its use in different contexts and with different cultural and gender groups.

  2. Freeway performance measurement system : an operational analysis tool

    DOT National Transportation Integrated Search

    2001-07-30

    PeMS is a freeway performance measurement system for all of California. It processes 2 : GB/day of 30-second loop detector data in real time to produce useful information. Managers : at any time can have a uniform, and comprehensive assessment of fre...

  3. Organizational Productivity Measurement: The Development and Evaluation of an Integrated Approach.

    DTIC Science & Technology

    1987-07-01

    measurement and aggregation strategy also has applications in management r information systems, performance appraisal , and other situations where multiple...larger organizational units. The basic measurement and aggregation strategy also has applications in manage- "".". ment information systems, criterion...much has been written on the subject of organizational productiv- ity, there is little consensus concerning its definition ( Tuttle , 1983). Such a lack

  4. Measuring Cooperative Biological Engagement Program (CBEP) Performance: Capacities, Capabilities, and Sustainability Enablers for Biorisk Management and Biosurveillance

    DTIC Science & Technology

    2014-01-01

    valid OMB control number. 1. REPORT DATE 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE Measuring...should approaches to monitoring program performance. Recognizing this, Congress requested that the Department of Defense improve metrics for measuring...Cooperative Biological Engagement Program Performance broader community of program evaluation practitioners, the work advances innovative approaches

  5. Managing for Results in America's Great City Schools 2014: Results from Fiscal Year 2012-13. A Report of the Performance Measurement and Benchmarking Project

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2014

    2014-01-01

    In 2002 the "Council of the Great City Schools" and its members set out to develop performance measures that could be used to improve business operations in urban public school districts. The Council launched the "Performance Measurement and Benchmarking Project" to achieve these objectives. The purposes of the project was to:…

  6. Engineering performance metrics

    NASA Astrophysics Data System (ADS)

    Delozier, R.; Snyder, N.

    1993-03-01

    Implementation of a Total Quality Management (TQM) approach to engineering work required the development of a system of metrics which would serve as a meaningful management tool for evaluating effectiveness in accomplishing project objectives and in achieving improved customer satisfaction. A team effort was chartered with the goal of developing a system of engineering performance metrics which would measure customer satisfaction, quality, cost effectiveness, and timeliness. The approach to developing this system involved normal systems design phases including, conceptual design, detailed design, implementation, and integration. The lessons teamed from this effort will be explored in this paper. These lessons learned may provide a starting point for other large engineering organizations seeking to institute a performance measurement system accomplishing project objectives and in achieving improved customer satisfaction. To facilitate this effort, a team was chartered to assist in the development of the metrics system. This team, consisting of customers and Engineering staff members, was utilized to ensure that the needs and views of the customers were considered in the development of performance measurements. The development of a system of metrics is no different than the development of any type of system. It includes the steps of defining performance measurement requirements, measurement process conceptual design, performance measurement and reporting system detailed design, and system implementation and integration.

  7. Project UCARE : Uniform Commuter Assistance Reporting and Evaluation for transportation demand management programs.

    DOT National Transportation Integrated Search

    2013-09-01

    Moving Ahead for Progress in the 21st Century Act (MAP-21) places emphasis upon results and better management of programs for effective and efficient service delivery. With an increased focus on measuring performance, the transportation demand manage...

  8. What's working, what's not: The monitoring and reporting system for Tasmania's national parks and reserves

    Treesearch

    Glenys Jones

    2015-01-01

    This paper describes the Australian State of Tasmania's management effectiveness Monitoring and Reporting System for national parks and reserves. This jurisdictional performance measurement system is designed to provide all interested parties with reliable factual information and measured evidence about reserve management achievements, progress and challenges. Key...

  9. 41 CFR 102-192.175 - What types of support does GSA offer to Federal agency mail management programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with Federal agencies; (c) Developing and providing access to a Governmentwide management information system for mail; (d) Helping agencies develop performance measures and management information systems for... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What types of support...

  10. [Controlling systems for operating room managers].

    PubMed

    Schüpfer, G; Bauer, M; Scherzinger, B; Schleppers, A

    2005-08-01

    Management means developing, shaping and controlling of complex, productive and social systems. Therefore, operating room managers also need to develop basic skills in financial and managerial accounting as a basis for operative and strategic controlling which is an essential part of their work. A good measurement system should include financial and strategic concepts for market position, innovation performance, productivity, attractiveness, liquidity/cash flow and profitability. Since hospitals need to implement a strategy to reach their business objectives, the performance measurement system has to be individually adapted to the strategy of the hospital. In this respect the navigation system developed by Gälweiler is compared to the "balanced score card" system of Kaplan and Norton.

  11. Western Cape Primary Care Assessment Tool (PCAT) study: Measuring primary care organisation and performance in the Western Cape Province, South Africa (2013)

    PubMed Central

    Sayed, Abdul-Rauf; le Grange, Cynthia; Bhagwan, Susheela; Manga, Nayna; Hellenberg, Derek

    2016-01-01

    Background Major health sector reform and the need for baseline measures of performance to determine impact. Aim Baseline audit of primary healthcare (PHC) performance. Setting Cape Town and Cape Winelands (rural) PHC facilities (PCFs) in Western Cape Province, South Africa. Method The South African cross-culturally validated ZA PCAT to audit PHC performance on 11 subdomains associated with improved health and reduced costs. Adult PCF users systematically sampled. All full-time doctors and nurse practitioners in PCFs sampled and all PCF managers in sub-districts sampled invited into the study. Results Data from 1432 users, 100 clinicians and 64 managers from 13 PCFs in 10 sub-districts analysed (figures show stakeholder percentages scoring subdomain performance ‘acceptable to good’). 11.5% users scored access ‘acceptable to good’; community orientation and comprehensive services provided 20.8% and 39.9%, respectively. Total PHC score for users 50.2%; for managers and practitioners 82.8% and 88.0%, respectively. Among practitioners access was lowest (33.3%); PHC team (98.0%) and comprehensive services available (100.0%) highest. Among managers, access (13.5%) and family centredness (45.6%) are lowest; PHC team (85.9%) and comprehensive services available (90.6%) highest. Managers scored access, family centredness and cultural competence significantly lower than practitioners. Users scored comprehensive services available, comprehensive services provided and community orientation significantly lower than practitioners and managers. Conclusion Gaps between users’ experience and providers’ assessments of PHC performance are identified. Features that need strengthening and alignment with best practice, provincial and national, and health policies are highlighted with implications for practitioner and manager training, health policy, and research. PMID:27247157

  12. Measuring, managing and maximizing performance of mineral processing plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bascur, O.A.; Kennedy, J.P.

    1995-12-31

    The implementation of continuous quality improvement is the confluence of Total Quality Management, People Empowerment, Performance Indicators and Information Engineering. The supporting information technologies allow a mineral processor to narrow the gap between management business objectives and the process control level. One of the most important contributors is the user friendliness and flexibility of the personal computer in a client/server environment. This synergistic combination when used for real time performance monitoring translates into production cost savings, improved communications and enhanced decision support. Other savings come from reduced time to collect data and perform tedious calculations, act quickly with fresh newmore » data, generate and validate data to be used by others. This paper presents an integrated view of plant management. The selection of the proper tools for continuous quality improvement are described. The process of selecting critical performance monitoring indices for improved plant performance are discussed. The importance of a well balanced technological improvement, personnel empowerment, total quality management and organizational assets are stressed.« less

  13. Maximizing Energy Savings Reliability in BC Hydro Industrial Demand-side Management Programs: An Assessment of Performance Incentive Models

    NASA Astrophysics Data System (ADS)

    Gosman, Nathaniel

    For energy utilities faced with expanded jurisdictional energy efficiency requirements and pursuing demand-side management (DSM) incentive programs in the large industrial sector, performance incentive programs can be an effective means to maximize the reliability of planned energy savings. Performance incentive programs balance the objectives of high participation rates with persistent energy savings by: (1) providing financial incentives and resources to minimize constraints to investment in energy efficiency, and (2) requiring that incentive payments be dependent on measured energy savings over time. As BC Hydro increases its DSM initiatives to meet the Clean Energy Act objective to reduce at least 66 per cent of new electricity demand with DSM by 2020, the utility is faced with a higher level of DSM risk, or uncertainties that impact the costeffective acquisition of planned energy savings. For industrial DSM incentive programs, DSM risk can be broken down into project development and project performance risks. Development risk represents the project ramp-up phase and is the risk that planned energy savings do not materialize due to low customer response to program incentives. Performance risk represents the operational phase and is the risk that planned energy savings do not persist over the effective measure life. DSM project development and performance risks are, in turn, a result of industrial economic, technological and organizational conditions, or DSM risk factors. In the BC large industrial sector, and characteristic of large industrial sectors in general, these DSM risk factors include: (1) capital constraints to investment in energy efficiency, (2) commodity price volatility, (3) limited internal staffing resources to deploy towards energy efficiency, (4) variable load, process-based energy saving potential, and (5) a lack of organizational awareness of an operation's energy efficiency over time (energy performance). This research assessed the capacity of alternative performance incentive program models to manage DSM risk in BC. Three performance incentive program models were assessed and compared to BC Hydro's current large industrial DSM incentive program, Power Smart Partners -- Transmission Project Incentives, itself a performance incentive-based program. Together, the selected program models represent a continuum of program design and implementation in terms of the schedule and level of incentives provided, the duration and rigour of measurement and verification (M&V), energy efficiency measures targeted and involvement of the private sector. A multi criteria assessment framework was developed to rank the capacity of each program model to manage BC large industrial DSM risk factors. DSM risk management rankings were then compared to program costeffectiveness, targeted energy savings potential in BC and survey results from BC industrial firms on the program models. The findings indicate that the reliability of DSM energy savings in the BC large industrial sector can be maximized through performance incentive program models that: (1) offer incentives jointly for capital and low-cost operations and maintenance (O&M) measures, (2) allow flexible lead times for project development, (3) utilize rigorous M&V methods capable of measuring variable load, process-based energy savings, (4) use moderate contract lengths that align with effective measure life, and (5) integrate energy management software tools capable of providing energy performance feedback to customers to maximize the persistence of energy savings. While this study focuses exclusively on the BC large industrial sector, the findings of this research have applicability to all energy utilities serving large, energy intensive industrial sectors.

  14. Medication and finance management among HIV-infected adults: the impact of age and cognition.

    PubMed

    Thames, April D; Kim, Michelle S; Becker, Brian W; Foley, Jessica M; Hines, Lindsay J; Singer, Elyse J; Heaton, Robert K; Castellon, Steven A; Hinkin, Charles H

    2011-02-01

    This study examined the effects of aging and cognitive impairment on medication and finance management in an HIV sample. We observed main effects of age (older < younger) and neuropsychological impairment on functional task performance. Interactions between age and cognition demonstrated that older impaired individuals performed significantly more poorly than all other comparison groups. There were no relationships between laboratory performance and self-reported medication and finance management. The interaction of advancing age and cognitive impairment may confer significant functional limitations for HIV individuals that may be better detected by performance-based measures of functional abilities rather than patient self-report.

  15. Medication and finance management among HIV-infected adults: The impact of age and cognition

    PubMed Central

    Thames, April D.; Kim, Michelle S.; Becker, Brian W.; Foley, Jessica M.; Hines, Lindsay J.; Singer, Elyse J.; Heaton, Robert K.; Castellon, Steven A.; Hinkin, Charles H.

    2013-01-01

    This study examined the effects of aging and cognitive impairment on medication and finance management in an HIV sample. We observed main effects of age (older < younger) and neuropsychological impairment on functional task performance. Interactions between age and cognition demonstrated that older impaired individuals performed significantly more poorly than all other comparison groups. There were no relationships between laboratory performance and self-reported medication and finance management. The interaction of advancing age and cognitive impairment may confer significant functional limitations for HIV individuals that may be better detected by performance-based measures of functional abilities rather than patient self-report. PMID:20694873

  16. Auditing Staff-Management Communication in Schools: A Framework for Evaluating Performance.

    ERIC Educational Resources Information Center

    Tourish, Dennis; Hargie, Owen

    1998-01-01

    Outlines the principles and procedures of an organizational communication audit as a measure of the effectiveness of personnel management in elementary and secondary schools, examining the principal tools used and the benefits that this approach offers to school management teams. (Author/MSE)

  17. Resource, quality and safety management.

    PubMed

    Hovenga, Evelyn J S

    2010-01-01

    This chapter gives an educational overview of: * Resource management relative to sustainability and the use casemix systems * Types of resources and their information system needs to support their optimal management * Quality, performance measurement options and associated information needs * Casemix systems' characteristics, usage and need for enterprise systems.

  18. 75 FR 49942 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ..., performance measurement, and improvement of SAMHSA administrative and management services; (3) provides...) coordinates and manages General Accounting Office (GAO) and Office of Inspector General (OIG) reviews of the...

  19. Cognitive Determinants of Academic Performance in Nigerian Pharmacy Schools.

    PubMed

    Ubaka, Chukwuemeka M; Sansgiry, Sujit S; Ukwe, Chinwe V

    2015-09-25

    Objective. To evaluate cognitive factors that might influence academic performance of students in Nigerian pharmacy schools. Methods. A cross-sectional, multi-center survey of Nigerian pharmacy students from 7 schools of pharmacy was conducted using 2 validated questionnaires measuring cognitive constructs such as test anxiety, academic competence, test competence, time management, and strategic study habits. Results. Female students and older students scored significantly better on time management skills and study habits, respectively. Test anxiety was negatively associated with academic performance while test competence, academic competence, and time management were positively associated with academic performance. These 4 constructs significantly discriminated between the lower and higher performing students, with the first 2 contributing to the most differences. Conclusion. Test and academic competence, test anxiety, and time management were significant factors associated with low and high academic performance among Nigerian pharmacy students. The study also demonstrated the significant effects of age, gender, and marital status on these constructs.

  20. Cognitive Determinants of Academic Performance in Nigerian Pharmacy Schools

    PubMed Central

    Sansgiry, Sujit S.; Ukwe, Chinwe V.

    2015-01-01

    Objective. To evaluate cognitive factors that might influence academic performance of students in Nigerian pharmacy schools. Methods. A cross-sectional, multi-center survey of Nigerian pharmacy students from 7 schools of pharmacy was conducted using 2 validated questionnaires measuring cognitive constructs such as test anxiety, academic competence, test competence, time management, and strategic study habits. Results. Female students and older students scored significantly better on time management skills and study habits, respectively. Test anxiety was negatively associated with academic performance while test competence, academic competence, and time management were positively associated with academic performance. These 4 constructs significantly discriminated between the lower and higher performing students, with the first 2 contributing to the most differences. Conclusion. Test and academic competence, test anxiety, and time management were significant factors associated with low and high academic performance among Nigerian pharmacy students. The study also demonstrated the significant effects of age, gender, and marital status on these constructs. PMID:27168614

  1. Electric Motor Thermal Management R&D; NREL (National Renewable Energy Laboratory)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennion, Kevin

    2015-06-09

    Thermal constraints place significant limitations on how electric motors ultimately perform. Without the ability to remove heat, the motor cannot operate without sacrificing performance, efficiency, and reliability. Finite element analysis and computational fluid dynamics modeling approaches are being increasingly utilized in the design and analysis of electric motors. As the models become more sophisticated, it is important to have detailed and accurate knowledge of both the passive thermal performance and the active cooling performance. In this work, we provide an overview of research characterizing both passive and active thermal elements related to electric motor thermal management. To better characterize themore » passive thermal performance, work is being performed to measure motor material thermal properties and thermal contact resistances. The active cooling performance of automatic transmission fluid (ATF) jets is also being measured to better understand the heat transfer coefficients of ATF impinging on motor copper windings.« less

  2. Emissions & Measurements - Black Carbon

    EPA Science Inventory

    Emissions and Measurement (EM) research activities performed within the National Risk Management Research Lab NRMRL) of EPA's Office of Research and Development (ORD) support measurement and laboratory analysis approaches to accurately characterize source emissions, and near sour...

  3. Perceptions of Community College Presidents: Total Quality Management Performance Measures at Their Colleges

    ERIC Educational Resources Information Center

    Riccardi, Mark T.

    2009-01-01

    Continuous Quality Improvement (CQI) measures such as Total Quality Management (TQM), Strategic Planning, Six Sigma, and the Balanced Scorecard are often met with skepticism among leaders of higher education. This study attempts to fill a gap in the literature regarding the study of relationships among specific variables, or building blocks,…

  4. Measuring urban forestry performance and demographic associations in Massachusetts, USA

    Treesearch

    David Rines; Brian Kane; David B. Kittredge; H. Dennis P. Ryan; Brett Butler

    2011-01-01

    The United States Forest Service measures successful management of the urban forest by the number of communities that have achieved some or all of four parameters described by the Community Accomplishment Reporting System. The four parameters address whether a community has: (1) a management plan, (2) professional staff, (3) urban forestry ordinances/policies, and (4)...

  5. 77 FR 36577 - Agency Information Collection Activities; Submission for OMB Review; Comment Request; Tax...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... PERFORMS, the performance management system for the UI program. UI PERFORMS incorporates a strategic planning process of identifying priorities; ongoing collection and monitoring of valid data to measure...

  6. Designing a balanced scorecard for a tertiary care hospital in Pakistan: a modified Delphi group exercise.

    PubMed

    Rabbani, Fauziah; Jafri, Syed M Wasim; Abbas, Farhat; Shah, Mairaj; Azam, Syed Iqbal; Shaikh, Babar Tasneem; Brommels, Mats; Tomson, Goran

    2010-01-01

    Balanced Scorecards (BSC) are being implemented in high income health settings linking organizational strategies with performance data. At this private university hospital in Pakistan an elaborate information system exists. This study aimed to make best use of available data for better performance management. Applying the modified Delphi technique an expert panel of clinicians and hospital managers reduced a long list of indicators to a manageable size. Indicators from existing documents were evaluated for their importance, scientific soundness, appropriateness to hospital's strategic plan, feasibility and modifiability. Panel members individually rated each indicator on a scale of 1-9 for the above criteria. Median scores were assigned. Of an initial set of 50 indicators, 20 were finally selected to be assigned to the four BSC quadrants. These were financial (n = 4), customer or patient (n = 4), internal business or quality of care (n = 7) and innovation/learning or employee perspectives (n = 5). A need for stringent definitions, international benchmarking and standardized measurement methods was identified. BSC compels individual clinicians and managers to jointly work towards improving performance. This scorecard is now ready to be implemented by this hospital as a performance management tool for monitoring indicators, addressing measurement issues and enabling comparisons with hospitals in other settings. Copyright 2010 John Wiley & Sons, Ltd.

  7. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  8. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  9. Benchmarking management practices in Australian public healthcare.

    PubMed

    Agarwal, Renu; Green, Roy; Agarwal, Neeru; Randhawa, Krithika

    2016-01-01

    The purpose of this paper is to investigate the quality of management practices of public hospitals in the Australian healthcare system, specifically those in the state-managed health systems of Queensland and New South Wales (NSW). Further, the authors assess the management practices of Queensland and NSW public hospitals jointly and globally benchmark against those in the health systems of seven other countries, namely, USA, UK, Sweden, France, Germany, Italy and Canada. In this study, the authors adapt the unique and globally deployed Bloom et al. (2009) survey instrument that uses a "double blind, double scored" methodology and an interview-based scoring grid to measure and internationally benchmark the management practices in Queensland and NSW public hospitals based on 21 management dimensions across four broad areas of management - operations, performance monitoring, targets and people management. The findings reveal the areas of strength and potential areas of improvement in the Queensland and NSW Health hospital management practices when compared with public hospitals in seven countries, namely, USA, UK, Sweden, France, Germany, Italy and Canada. Together, Queensland and NSW Health hospitals perform best in operations management followed by performance monitoring. While target management presents scope for improvement, people management is the sphere where these Australian hospitals lag the most. This paper is of interest to both hospital administrators and health care policy-makers aiming to lift management quality at the hospital level as well as at the institutional level, as a vehicle to consistently deliver sustainable high-quality health services. This study provides the first internationally comparable robust measure of management capability in Australian public hospitals, where hospitals are run independently by the state-run healthcare systems. Additionally, this research study contributes to the empirical evidence base on the quality of management practices in the Australian public healthcare systems of Queensland and NSW.

  10. A theoretical framework for holistic hospital management in the Japanese healthcare context.

    PubMed

    Liu, Hu-Chen

    2013-11-01

    This paper develops a conceptual framework for performance measurement as a pilot study on holistic hospital management in the Japanese healthcare context. We primarily used two data sources as well as expert statements obtained through interviews: a systematic review of literature and a questionnaire survey to healthcare experts. The systematic survey searched PubMed and PubMed Central, and 24 relevant papers were elicited. The expert questionnaire asked respondents to rate the degree of "usefulness" for each of 66 indicators on a three-point scale. Applying the theoretical framework, a minimum set of performance indicators was selected for holistic hospital management, which well fit the healthcare context in Japan. This indicator set comprised 35 individual indicators and several factors measured through questionnaire surveys. The indicators were confirmed by expert judgments from viewpoints of face, content and construct validities as well as their usefulness. A theoretical framework of performance measurement was established from primary healthcare stakeholders' perspectives. Performance indicators were largely divided into healthcare outcomes and performance shaping factors. Indicators in the former category may be applied for the detection of operational problems, while their latent causes can be effectively addressed by the latter category in terms of process, structure and culture/climate within the organization. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  11. Diagnostic-management system and test pulse acquisition for WEST plasma measurement system

    NASA Astrophysics Data System (ADS)

    Wojenski, A.; Kasprowicz, G.; Pozniak, K. T.; Byszuk, A.; Juszczyk, B.; Zabolotny, W.; Zienkiewicz, P.; Chernyshova, M.; Czarski, T.; Mazon, D.; Malard, P.

    2014-11-01

    This paper describes current status of electronics, firmware and software development for new plasma measurement system for use in WEST facility. The system allows to perform two dimensional plasma visualization (in time) with spectrum measurement. The analog front-end is connected to Gas Electron Multiplier detector (GEM detector). The system architecture have high data throughput due to use of PCI-Express interface, Gigabit Transceivers and sampling frequency of ADC integrated circuits. The hardware is based on several years of experience in building X-ray spectrometer system for Joint European Torus (JET) facility. Data streaming is done using Artix7 FPGA devices. The system in basic configuration can work with up to 256 channels, while the maximum number of measurement channels is 2048. Advanced firmware for the FPGA is required in order to perform high speed data streaming and analog signal sampling. Diagnostic system management has been developed in order to configure measurement system, perform necessary calibration and prepare hardware for data acquisition.

  12. The Relationship of Individual Difference and Group Process Variables with Self-Managed Team Performance: A Field Investigation

    DTIC Science & Technology

    2001-12-15

    emotional stability, openness to experience, agreeableness, learning and performance goal orientation) and process variables ( social cohesion and group...both subjective performance measures and 6 of the 7 objective performance measures over that of social cohesion . Social cohesion predicted unique...variance in team member satisfaction over that of group potency. Additionally, social cohesion mediated the relationship between agreeableness and team

  13. Rationalization and the Individuals with Disabilities Education Act: Exploring the Characteristics of Multi-Level Performance Monitoring and Improvement

    ERIC Educational Resources Information Center

    Mahu, Robert J.

    2017-01-01

    Performance measurement has emerged as a management tool that, accompanied by advances in technology and data analysis, has allowed public officials to control public policy at multiple levels of government. In the United States, the federal government has used performance measurement as part of an accountability strategy that enables Congress and…

  14. Tools for Measuring and Improving Performance.

    ERIC Educational Resources Information Center

    Jurow, Susan

    1993-01-01

    Explains the need for meaningful performance measures in libraries and the Total Quality Management (TQM) approach to data collection. Five tools representing different stages of a TQM inquiry are covered (i.e., the Shewhart Cycle, flowcharts, cause-and-effect diagrams, Pareto charts, and control charts), and benchmarking is addressed. (Contains…

  15. Developing a Performance Measurement System for University Central Administrative Services

    ERIC Educational Resources Information Center

    Arena, Marika; Arnaboldi, Michela; Azzone, Giovanni; Carlucci, Paola

    2009-01-01

    Central administrative services have recently received increasing attention from practitioners and academics due to the challenging need to both manage scarce resources and provide high-quality services. In this context, performance measurement systems (PMSs) may assume a central role, although an unresolved debate remains on the claimed benefits…

  16. Performance management of the public healthcare services in Ireland: a review.

    PubMed

    Mesabbah, Mohammed; Arisha, Amr

    2016-01-01

    Performance Management (PM) processes have become a potent part of strategic and service quality decisions in healthcare organisations. In 2005, the management of public healthcare in Ireland was amalgamated into a single integrated management body, named the Health Service Executive (HSE). Since then, the HSE has come up with a range of strategies for healthcare developments and reforms, and has developed a PM system as part of its strategic planning. The purpose of this paper is to review the application of PM in the Irish Healthcare system, with a particular focus on Irish Hospitals and Emergency Services. An extensive review of relevant HSE's publications from 2005 to 2013 is conducted. Studies of the relevant literature related to the application of PM and of international best practices in healthcare performance systems are also presented. PM and performance measurement systems used by the HSE include many performance reports designed to monitor performance trends and strategic goals. Issues in the current PM system include inconsistency of measures and performance reporting, unclear strategy alignment, and deficiencies in reporting (e.g. feedback and corrective actions). Furthermore, PM processes have not been linked adequately into Irish public hospitals' management systems. The HSE delivers several services such as mental health, social inclusion, etc. This study focuses on the HSE's PM framework, with a particular interest in acute hospitals and emergency services. This is the first comprehensive review of Irish healthcare PM since the introduction of the HSE. A critical analysis of the HSE reports identifies the shortcomings in its current PM system.

  17. Eight essentials of performance measurement.

    PubMed

    Moullin, Max

    2004-01-01

    A well-designed performance measurement system is vital for ensuring that organisations deliver cost-effective, high-quality services that meet the needs of service users. Without feedback on all important aspects and a system for ensuring that the organisation acts on that information, managers are struggling in the dark to improve services. However, performance measurement is not easy, particularly in health and public services where a wide range of stakeholders is involved. This article discusses what the author considers to be the eight essentials of performance measurement. Though described in the context of health and social care, they are important for organisations in all sectors.

  18. Breaking the barriers to adopting satellite remote sensing for water quality management: ?monitoring cyanobacteria blooms

    EPA Science Inventory

    Remote sensing technology has the potential to inform and accelerate the engagement of communities and managers in the implementation and performance of best management practices. Over the last few decades, satellite technology has allowed measurements on a global scale over long...

  19. Measuring Operational Resilience Using the CERT(Registered) Resilience Management Model

    DTIC Science & Technology

    2010-09-01

    such as ISO 27002 [ ISO 2005]) and then measure the implementation and performance of practices contained in the standard. This checklist-based ap...Security techniques – Code of practice for information security management. ISO /IEC 27002 :2005, June 2005. Also known as ISO /IEC 17799:2005. [ ISO 2007...Table 23: ISO 15939 Process Activities and Tasks 54 Table 24: CERT-RMM Measurement and Analysis Process Area Goals and Practices 55 CMU/SEI

  20. Identifying Key Performance Indicators for Holistic Hospital Management with a Modified DEMATEL Approach.

    PubMed

    Si, Sheng-Li; You, Xiao-Yue; Liu, Hu-Chen; Huang, Jia

    2017-08-19

    Performance analysis is an important way for hospitals to achieve higher efficiency and effectiveness in providing services to their customers. The performance of the healthcare system can be measured by many indicators, but it is difficult to improve them simultaneously due to the limited resources. A feasible way is to identify the central and influential indicators to improve healthcare performance in a stepwise manner. In this paper, we propose a hybrid multiple criteria decision making (MCDM) approach to identify key performance indicators (KPIs) for holistic hospital management. First, through integrating evidential reasoning approach and interval 2-tuple linguistic variables, various assessments of performance indicators provided by healthcare experts are modeled. Then, the decision making trial and evaluation laboratory (DEMATEL) technique is adopted to build an interactive network and visualize the causal relationships between the performance indicators. Finally, an empirical case study is provided to demonstrate the proposed approach for improving the efficiency of healthcare management. The results show that "accidents/adverse events", "nosocomial infection", ''incidents/errors", "number of operations/procedures" are significant influential indicators. Also, the indicators of "length of stay", "bed occupancy" and "financial measures" play important roles in performance evaluation of the healthcare organization. The proposed decision making approach could be considered as a reference for healthcare administrators to enhance the performance of their healthcare institutions.

  1. OLEM Performance Assessment Information

    EPA Pesticide Factsheets

    This asset includes a variety of data sets that measure the performance of Office of Land and Emergency Management (OLEM) programs in support of the Office of the Chief Financial Officer's Annual Commitment System (ACS) and Performance Evaluation Reporting System (PERS). Information is drawn from OLEM's ACRES, RCRAInfo, CERCLIS/SEMS, ICIS, and LUST4 systems, as well as input manually by authorized individuals in OLEM's program offices. Information is reviewed by OLEM program staff prior to being pushed to ACS and entered into PERS. This data asset also pulls in certain performance information input directly by Regional Office staff into ACS. Information is managed by the Performance Assessment Tool (PAT) and displayed in the PAT Dashboard.Information in this asset include:--Government Performance and Results Act (GPRA) of 1993: Measures reported for Innovations, Partnerships and Communications Office (IPCO), the Office of Brownfields and Land Revitalization (OBLR), the Office of Emergency Management (OEM), the Office of Resource Conservation and Recovery (ORCR), the Office of Superfund Remediation and Technology Innovation (OSRTI), and the Office of Underground Storage Tanks (OUST).-- Performance and Environmental Results System (PERS): Includes OLEM's information on performance results and baselines for the EPA Annual Plan and Budget.--Key Performance Indicators: OLEM has identified five KPIs that are tracked annually.--Integrated Cleanup Initiative: A pilot pe

  2. Analysis relating to pavement material characterizations and their effects on pavement performance.

    DOT National Transportation Integrated Search

    1998-01-01

    This report presents the analysis conducted on relating pavement performance or response measures and design considerations to specific pavement layers utilizing data contained in the Long-Term Pavement Performance Program National Information Manage...

  3. Ecosystem performance monitoring of rangelands by integrating modeling and remote sensing

    USGS Publications Warehouse

    Wylie, Bruce K.; Boyte, Stephen P.; Major, Donald J.

    2012-01-01

    Monitoring rangeland ecosystem dynamics, production, and performance is valuable for researchers and land managers. However, ecosystem monitoring studies can be difficult to interpret and apply appropriately if management decisions and disturbances are inseparable from the ecosystem's climate signal. This study separates seasonal weather influences from influences caused by disturbances and management decisions, making interannual time-series analysis more consistent and interpretable. We compared the actual ecosystem performance (AEP) of five rangeland vegetation types in the Owyhee Uplands for 9 yr to their expected ecosystem performance (EEP). Integrated growing season Normalized Difference Vegetation Index data for each of the nine growing seasons served as a proxy for annual AEP. Regression-tree models used long-term site potential, seasonal weather, and land cover data sets to generate annual EEP, an estimate of ecosystem performance incorporating annual weather variations. The difference between AEP and EEP provided a performance measure for each pixel in the study area. Ecosystem performance anomalies occurred when the ecosystem performed significantly better or worse than the model predicted. About 14% of the Owyhee Uplands showed a trend of significant underperformance or overperformance (P<0.10). Land managers can use results from weather-based rangeland ecosystem performance models to help support adaptive management strategies.

  4. The relationship between organizational culture and performance in acute hospitals.

    PubMed

    Jacobs, Rowena; Mannion, Russell; Davies, Huw T O; Harrison, Stephen; Konteh, Fred; Walshe, Kieran

    2013-01-01

    This paper examines the relationship between senior management team culture and organizational performance in English acute hospitals (NHS Trusts) over three time periods between 2001/2002 and 2007/2008. We use a validated culture rating instrument, the Competing Values Framework, to measure senior management team culture. Organizational performance is assessed using a wide range of routinely collected indicators. We examine the associations between organizational culture and performance using ordered probit and multinomial logit models. We find that organizational culture varies across hospitals and over time, and this variation is at least in part associated in consistent and predictable ways with a variety of organizational characteristics and routine measures of performance. Moreover, hospitals are moving towards more competitive culture archetypes which mirror the current policy context, though with a stronger blend of cultures. The study provides evidence for a relationship between culture and performance in hospital settings. Copyright © 2012 Elsevier Ltd. All rights reserved.

  5. A Public-Private Partnership Improves Clinical Performance In A Hospital Network In Lesotho.

    PubMed

    McIntosh, Nathalie; Grabowski, Aria; Jack, Brian; Nkabane-Nkholongo, Elizabeth Limakatso; Vian, Taryn

    2015-06-01

    Health care public-private partnerships (PPPs) between a government and the private sector are based on a business model that aims to leverage private-sector expertise to improve clinical performance in hospitals and other health facilities. Although the financial implications of such partnerships have been analyzed, few studies have examined the partnerships' impact on clinical performance outcomes. Using quantitative measures that reflected capacity, utilization, clinical quality, and patient outcomes, we compared a government-managed hospital network in Lesotho, Africa, and the new PPP-managed hospital network that replaced it. In addition, we used key informant interviews to help explain differences in performance. We found that the PPP-managed network delivered more and higher-quality services and achieved significant gains in clinical outcomes, compared to the government-managed network. We conclude that health care public-private partnerships may improve hospital performance in developing countries and that changes in management and leadership practices might account for differences in clinical outcomes. Project HOPE—The People-to-People Health Foundation, Inc.

  6. Project officer's perspective: quality assurance as a management tool.

    PubMed

    Heiby, J

    1993-06-01

    Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.

  7. Validation of a Self-Efficacy Instrument and Its Relationship to Performance of Crisis Resource Management Skills

    ERIC Educational Resources Information Center

    Plant, Jennifer L.; van Schaik, Sandrijn M.; Sliwka, Diane C.; Boscardin, Christy K.; O'Sullivan, Patricia S.

    2011-01-01

    Self-efficacy is thought to be important for resuscitation proficiency in that it influences the development of and access to the associated medical knowledge, procedural skills and crisis resource management (CRM) skills. Since performance assessment of CRM skills is challenging, self-efficacy is often used as a measure of competence in this…

  8. Public Management Reform and Organizational Performance: An Empirical Assessment of the U.K. Labour Government's Public Service Improvement Strategy

    ERIC Educational Resources Information Center

    Walker, Richard M.; Boyne, George A.

    2006-01-01

    We present the first empirical assessment of the U.K. Labour government's program of public management reform. This reform program is based on rational planning, devolution and delegation, flexibility and incentives, and enhanced choice. Measures of these variables are tested against external and internal indicators of organizational performance.…

  9. Assessment of the psychometric properties of the Family Management Measure.

    PubMed

    Knafl, Kathleen; Deatrick, Janet A; Gallo, Agatha; Dixon, Jane; Grey, Margaret; Knafl, George; O'Malley, Jean

    2011-06-01

    This paper reports development of the Family Management Measure (FaMM) of parental perceptions of family management of chronic conditions. By telephone interview, 579 parents of children age 3 to 19 with a chronic condition (349 partnered mothers, 165 partners, 65 single mothers) completed the FaMM and measures of child functional status and behavioral problems and family functioning. Analyses addressed reliability, factor structure, and construct validity. Exploratory factor analysis yielded six scales: Child's Daily Life, Condition Management Ability, Condition Management Effort, Family Life Difficulty, Parental Mutuality, and View of Condition Impact. Internal consistency reliability ranged from .72 to .91, and test-retest reliability from .71 to .94. Construct validity was supported by significant correlations in hypothesized directions between FaMM scales and established measures. Results support FaMM's; reliability and validity, indicating it performs in a theoretically meaningful way and taps distinct aspects of family response to childhood chronic conditions.

  10. Angler satisfaction in South Dakota

    USGS Publications Warehouse

    Henderson, Kjetil R.; Gigliotti, Larry M.

    2015-01-01

    Many industries use satisfaction measures to evaluate performance. The South Dakota Department of Game, Fish and Parks identified satisfaction as one of their performance measures for evaluating fishing in South Dakota. In fisheries management, the perspectives’ of license buyers are valuable to determine if management activities are providing the benefits anticipated by biologists. Surveys of South Dakota anglers are conducted to better understand licensees in order to promote satisfying angling experiences. Internet surveys were distributed to all license buyers providing email addresses in 2011 and 2012. Angler satisfaction was analyzed by angler type (demographics and fishing characteristics) to further clarify performance measures. Most anglers (> 70%) were satisfied with their angling experiences. Nonresidents expressed higher levels of satisfaction with fishing in South Dakota in 2011 and 2012 than residents. Anglers’ rating of fishing quality was more strongly correlated with satisfaction than their reported number of fish harvested, which suggests that strategies to influence angler perceptions and expectations can also be employed to influence satisfaction (in addition to techniques influencing fish populations). This research further integrates sociological data into South Dakota fisheries management processes.

  11. Integrating automated support for a software management cycle into the TAME system

    NASA Technical Reports Server (NTRS)

    Sunazuka, Toshihiko; Basili, Victor R.

    1989-01-01

    Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system.

  12. Factors influencing the choice of performance measures for the oil and gas supply chain – exploratory study

    NASA Astrophysics Data System (ADS)

    Menhat, Masha; Yusuf, Y.

    2018-04-01

    The current value of the oil price per barrel has severely impacted the oil and gas industry around the world. This has worsened the situation due to the fact that it has long been the backbone of the country through the energy supply, employability and also its role as the major economic contributor. Due to multiple external factors that affect this industry such as crude oil availability, oil price fluctuation, high transportation cost, as well as exposure to high uncertainties, it is sensible for the supply chain practitioner to shift their focus in managing their resources and capabilities. To maximise the potential of supply chain activities in improving overall company performance, it is important to pay extra attention on their performance management. This includes the design of meaningful performance measurement framework to assess organisational performance. This study will explore the influencing factors in choosing performance measures for the oil and gas supply chain. Five in-depth interviews were conducted with supply chain experts within the industry. Eight influencing factors have been identified through the interviews.

  13. The Uniform Chart of Accounts and Its Use in Management Control.

    DTIC Science & Technology

    1982-10-01

    accounting reports [Ref. 10: p.45]. Horngren [Ref. 5: p. 162] notes that a common complaint of *, managers is that they are unfairly charged with costs ...aids of amsst 0W somir IM WOR M oo Owp U CA Hospital Management Control Uniform Chart of Accounts Performance Measurement Hospital Cost Accounting ...Output Measurement HCU 30. he.T ACT fCamnnus m .. s ado It 09000*Min d IdWOReeO 661 eammeei ~Full implementation of thc Uniform Chart of Accounts (UCA

  14. The balanced scorecard: an integrative approach to performance evaluation.

    PubMed

    Oliveira, J

    2001-05-01

    In addition to strict financial outcomes, healthcare financial managers should assess intangible assets that affect the organization's bottom line, such as clinical processes, staff skills, and patient satisfaction and loyalty. The balanced scorecard, coupled with data-warehousing capabilities, offers a way to measure an organization's performance against its strategic objectives while focusing on building capabilities to achieve these objectives. The balanced scorecard examines performance related to finance, human resources, internal processes, and customers. Because the balanced scorecard requires substantial amounts of data, it is a necessity to establish an organizational data warehouse of clinical, operational, and financial data that can be used in decision support. Because it presents indicators that managers and staff can influence directly by their actions, the balanced-scorecard approach to performance measurement encourages behavioral changes aimed at achieving corporate strategies.

  15. Developing a planning model to estimate future cash flows.

    PubMed

    Barenbaum, L; Monahan, T F

    1988-03-01

    Financial managers are discovering that net income and other traditional measures of cash flow may not provide them with the flexibility needed for comprehensive internal planning and control. By using a discretionary cash flow model, financial managers have a forecasting tool that can help them measure anticipated cash flows, and make better decisions concerning financing alternatives, capital expansion, and performance appraisal.

  16. Approaches to chronic disease management evaluation in use in Europe: a review of current methods and performance measures.

    PubMed

    Conklin, Annalijn; Nolte, Ellen; Vrijhoef, Hubertus

    2013-01-01

    An overview was produced of approaches currently used to evaluate chronic disease management in selected European countries. The study aims to describe the methods and metrics used in Europe as a first to help advance the methodological basis for their assessment. A common template for collection of evaluation methods and performance measures was sent to key informants in twelve European countries; responses were summarized in tables based on template evaluation categories. Extracted data were descriptively analyzed. Approaches to the evaluation of chronic disease management vary widely in objectives, designs, metrics, observation period, and data collection methods. Half of the reported studies used noncontrolled designs. The majority measure clinical process measures, patient behavior and satisfaction, cost and utilization; several also used a range of structural indicators. Effects are usually observed over 1 or 3 years on patient populations with a single, commonly prevalent, chronic disease. There is wide variation within and between European countries on approaches to evaluating chronic disease management in their objectives, designs, indicators, target audiences, and actors involved. This study is the first extensive, international overview of the area reported in the literature.

  17. Cultural characteristics of "high" and "low" performing hospitals.

    PubMed

    Mannion, R; Davies, H T O; Marshall, M N

    2005-01-01

    To compare and contrast the cultural characteristics of "high" and "low" performing hospitals in the UK National Health Service (NHS). A multiple case study design incorporating a purposeful sample of "low" and "high" performing acute hospital Trusts, as assessed by the star performance rating system. These case studies suggest that "high" and "low" performing acute hospital organisations may be very different environments in which to work. Although each case possessed its own unique character, significant patternings were observed within cases grouped by performance to suggest considerable cultural divergence. The key points of divergence can be grouped under four main headings: leadership and management orientation; accountability and information systems; human resources policies; and relationships within the local health economy. As with any study, interpretation of findings should be tempered with a degree of caution because of methodological considerations. First, there are the limitations of case study which proceeds on the basis of theoretical rather than quantitative generalisation. Second, organisational culture was assessed by exploring the views of middle and senior managers. While one should in no way suggest that such an approach can capture all important cultural characteristics of organisations, it is believed that it may be at least partially justified, given the agenda-setting powers and influence of the senior management team. Finally "star" performance measures are far from a perfect measure of organisational performance. Despite such reservations, the findings indicate that organisational culture is associated in a variety of non-trivial ways with the measured performance of hospital organisations. Highlights considerable cultural divergence within UK NHS hospitals.

  18. Job Performance Tests for CH-53E Helicopter Mechanics. Volume 2: Administrative Duties and Job Knowledge Tests

    DTIC Science & Technology

    1992-01-01

    SUBTmI.E 5 FU.NDING NUMBERS Job Performance Tests for CII-53E Helicopter Miechanacs - Volume I1: Admiutstrative Duties and Job Knowlede Tests C - N...performance measures to Marine Corps personnel managers . training instructors, and interested researchers who may find them useful. This work comprises...Corps personnel managers , training instructors, and interested researchers who may find them useful. 3. This work comprises two parts: volume I

  19. Performance management: People, productivity, and careers (notes from presentation)

    Treesearch

    Gerhardus P. Smith

    1999-01-01

    The challenge for management is to ensure that the value and impact of people's outputs are greater than the cost of their inputs. Some measurements can include finances, growth, and employee satisfaction surveys. The role of a manager is sometimes that of an an expert and other times as a facilitator/ coach. A manager helps align organizational goals with an...

  20. The Second Stroke Audit of Catalonia shows improvements in many, but not all quality indicators.

    PubMed

    Abilleira, Sònia; Ribera, Aida; Sánchez, Emília; Tresserras, Ricard; Gallofré, Miquel

    2012-01-01

    Periodic audits allow monitoring of healthcare quality by comparing performances at different time points. Aims To assess quality of in-hospital stroke care in Catalonia in 2007 and compare it with 2005 (post-/preguidelines delivery, respectively). Data on 13 evidence-based performance measures were collected by a retrospective review of medical records of consecutive stroke admissions (January-December 2007) to 47 acute hospitals in Catalonia. Adherence was calculated according to the ratio (patients with documented performance measures' compliance) (valid cases for that measure). Sampling weights were applied to produce estimates of compliance. The proportions of compliance with performance measures in both audits were compared using random-effects logistic regressions, with each performance measure as the dependent variable and audit edition as the explanatory variable to determine whether changes in stroke care quality occurred along time. We analyzed 1767 events distributed among 47 hospitals. In 2007, there was an increase in tissue plasminogen activator administrations (2·8% vs. 5·9%) and stroke unit admissions (16·6% vs. 22·6%) and a reduction in seven-day mortality (9·5% vs. 6·8%). Logistic regression models provided evidence of improved adherences to seven performance measures (screening of dysphagia, management of hyperthermia, baseline computed tomography scan, baseline glycemia, rehabilitation needs, early mobilization, and anticoagulants for atrial fibrillation), but worsening of management of hypertension, dyslipidemia, and antithrombotics at discharge. The remaining three performance measures showed no changes. The Second Stroke Audit showed improvements in most dimensions of care, although unexpectedly a few but relevant performance measures became worse. Therefore, periodic stroke audits are needed to check changes in quality of care over time. © 2011 The Authors. International Journal of Stroke © 2011 World Stroke Organization.

  1. Surgical Crisis Management Skills Training and Assessment

    PubMed Central

    Moorthy, Krishna; Munz, Yaron; Forrest, Damien; Pandey, Vikas; Undre, Shabnam; Vincent, Charles; Darzi, Ara

    2006-01-01

    Background: Intraoperative surgical crisis management is learned in an unstructured manner. In aviation, simulation training allows aircrews to coordinate and standardize recovery strategies. Our aim was to develop a surgical crisis simulation and evaluate its feasibility, realism, and validity of the measures used to assess performance. Methods: Surgical trainees were exposed to a bleeding crisis in a simulated operating theater. Assessment of performance consisted of a trainee’s technical ability to control the bleeding and of their team/human factors skills. This assessment was performed in a blinded manner by 2 surgeons and one human factors expert. Other measures consisted of time measures such as time to diagnose the bleeding (TD), inform team members (TT), achieve control (TC), and close the laceration (TL). Blood loss was used as a surrogate outcome measures. Results: There were considerable variations within both senior (n = 10) and junior (n = 10) trainees for technical and team skills. However, while the senior trainees scored higher than the juniors for technical skills (P = 0.001), there were no differences in human factors skills. There were also significant differences between the 2 groups for TD (P = 0.01), TC (P = 0.001), and TL (0.001). The blood loss was higher in the junior group. Conclusions: We have described the development of a novel simulated setting for the training of crisis management skills and the variability in performance both in between and within the 2 groups. PMID:16794399

  2. A Map for Clinical Laboratories Management Indicators in the Intelligent Dashboard.

    PubMed

    Azadmanjir, Zahra; Torabi, Mashallah; Safdari, Reza; Bayat, Maryam; Golmahi, Fatemeh

    2015-08-01

    management challenges of clinical laboratories are more complicated for educational hospital clinical laboratories. Managers can use tools of business intelligence (BI), such as information dashboards that provide the possibility of intelligent decision-making and problem solving about increasing income, reducing spending, utilization management and even improving quality. Critical phase of dashboard design is setting indicators and modeling causal relations between them. The paper describes the process of creating a map for laboratory dashboard. the study is one part of an action research that begins from 2012 by innovation initiative for implementing laboratory intelligent dashboard. Laboratories management problems were determined in educational hospitals by the brainstorming sessions. Then, with regard to the problems key performance indicators (KPIs) specified. the map of indicators designed in form of three layered. They have a causal relationship so that issues measured in the subsequent layers affect issues measured in the prime layers. the proposed indicator map can be the base of performance monitoring. However, these indicators can be modified to improve during iterations of dashboard designing process.

  3. Determining the causal relationships among balanced scorecard perspectives on school safety performance: case of Saudi Arabia.

    PubMed

    Alolah, Turki; Stewart, Rodney A; Panuwatwanich, Kriengsak; Mohamed, Sherif

    2014-07-01

    In the public schools of many developing countries, numerous accidents and incidents occur because of poor safety regulations and management systems. To improve the educational environment in Saudi Arabia, the Ministry of Education seeks novel approaches to measure school safety performance in order to decrease incidents and accidents. The main objective of this research was to develop a systematic approach for measuring Saudi school safety performance using the balanced scorecard framework philosophy. The evolved third generation balanced scorecard framework is considered to be a suitable and robust framework that captures the system-wide leading and lagging indicators of business performance. The balanced scorecard architecture is ideal for adaptation to complex areas such as safety management where a holistic system evaluation is more effective than traditional compartmentalised approaches. In developing the safety performance balanced scorecard for Saudi schools, the conceptual framework was first developed and peer-reviewed by eighteen Saudi education experts. Next, 200 participants, including teachers, school executives, and Ministry of Education officers, were recruited to rate both the importance and the performance of 79 measurement items used in the framework. Exploratory factor analysis, followed by the confirmatory partial least squares method, was then conducted in order to operationalise the safety performance balanced scorecard, which encapsulates the following five salient perspectives: safety management and leadership; safety learning and training; safety policy, procedures and processes; workforce safety culture; and safety performance. Partial least squares based structural equation modelling was then conducted to reveal five significant relationships between perspectives, namely, safety management and leadership had a significant effect on safety learning and training and safety policy, procedures and processes, both safety learning and training and safety policy, procedures and processes had significant effects on workforce safety culture, and workforce safety culture had a significant effect on safety performance. Copyright © 2014 Elsevier Ltd. All rights reserved.

  4. Energy saving in WWTP: Daily benchmarking under uncertainty and data availability limitations.

    PubMed

    Torregrossa, D; Schutz, G; Cornelissen, A; Hernández-Sancho, F; Hansen, J

    2016-07-01

    Efficient management of Waste Water Treatment Plants (WWTPs) can produce significant environmental and economic benefits. Energy benchmarking can be used to compare WWTPs, identify targets and use these to improve their performance. Different authors have performed benchmark analysis on monthly or yearly basis but their approaches suffer from a time lag between an event, its detection, interpretation and potential actions. The availability of on-line measurement data on many WWTPs should theoretically enable the decrease of the management response time by daily benchmarking. Unfortunately this approach is often impossible because of limited data availability. This paper proposes a methodology to perform a daily benchmark analysis under database limitations. The methodology has been applied to the Energy Online System (EOS) developed in the framework of the project "INNERS" (INNovative Energy Recovery Strategies in the urban water cycle). EOS calculates a set of Key Performance Indicators (KPIs) for the evaluation of energy and process performances. In EOS, the energy KPIs take in consideration the pollutant load in order to enable the comparison between different plants. For example, EOS does not analyse the energy consumption but the energy consumption on pollutant load. This approach enables the comparison of performances for plants with different loads or for a single plant under different load conditions. The energy consumption is measured by on-line sensors, while the pollutant load is measured in the laboratory approximately every 14 days. Consequently, the unavailability of the water quality parameters is the limiting factor in calculating energy KPIs. In this paper, in order to overcome this limitation, the authors have developed a methodology to estimate the required parameters and manage the uncertainty in the estimation. By coupling the parameter estimation with an interval based benchmark approach, the authors propose an effective, fast and reproducible way to manage infrequent inlet measurements. Its use enables benchmarking on a daily basis and prepares the ground for further investigation. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Development, implementation, and evaluation of a mental rehearsal strategy to improve clinical performance and reduce stress: A mixed methods study.

    PubMed

    Ignacio, Jeanette; Dolmans, Diana; Scherpbier, Albert; Rethans, Jan-Joost; Lopez, Violeta; Liaw, Sok Ying

    2016-02-01

    Mental rehearsal is a form of mental training that has been used by physicians and nurses to improve performance of clinical skills, and as a vital component of stress management training. To help novice nurses deal with often stressful clinical events that require the processing of information essential to patient management, a mental rehearsal strategy was developed and implemented in a Year 3 nursing simulation program. Inherent to mental rehearsal is imagery, which facilitates cognitive and affective modification, and reduction of extraneous cognitive load. As such, it was expected that the mental rehearsal strategy would improve students' performance and reduce stress in managing deteriorating patients. The study used a mixed methods design. Eighteen Year 3 nursing students participated in the pre- and post-design study, which consisted of the development and implementation of a mental rehearsal strategy. The Rescuing A Patient In Deteriorating Situations (RAPIDS) tool was used to assess performance. Heart rates and systolic blood pressures were used to measure stress. The State-Trait Anxiety Inventory (STAI) was used as a psychological measure of stress/anxiety. Five participants were involved in a focus group discussion that evaluated the usefulness of the mental rehearsal strategy. There was a significant improvement in performance (P<0.05). However, post-test heart rate and systolic blood pressure were not significantly different from pre-test measures. A comparison of STAI results did not show significant differences between pre- and post-test state anxiety and pre- and post-test trait anxiety. Three themes emerged from the focus group interview: managing stress, using a mental framework, and integrating realistic simulations with the mental rehearsal strategy. The mental rehearsal strategy for deteriorating patient management can be valuable based on the findings on performance and based on the participants' feedback. Its role in reducing stress, however, needs further evaluation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  6. The E-Balanced Scorecard (e-BSC) for Measuring Academic Staff Performance Excellence

    ERIC Educational Resources Information Center

    Yu, May Leen; Hamid, Suraya; Ijab, Mohamad Taha; Soo, Hsaio Pei

    2009-01-01

    This research paper is a pilot study that investigated the suitability of adopting an automated balanced scorecard for managing and measuring the performance excellence of academic staffs in the higher education setting. A comprehensive study of related literature with requirements elicited from the target population in a selected premier…

  7. Doctors or technicians: assessing quality of medical education

    PubMed Central

    Hasan, Tayyab

    2010-01-01

    Medical education institutions usually adapt industrial quality management models that measure the quality of the process of a program but not the quality of the product. The purpose of this paper is to analyze the impact of industrial quality management models on medical education and students, and to highlight the importance of introducing a proper educational quality management model. Industrial quality management models can measure the training component in terms of competencies, but they lack the educational component measurement. These models use performance indicators to assess their process improvement efforts. Researchers suggest that the performance indicators used in educational institutions may only measure their fiscal efficiency without measuring the quality of the educational experience of the students. In most of the institutions, where industrial models are used for quality assurance, students are considered as customers and are provided with the maximum services and facilities possible. Institutions are required to fulfill a list of recommendations from the quality control agencies in order to enhance student satisfaction and to guarantee standard services. Quality of medical education should be assessed by measuring the impact of the educational program and quality improvement procedures in terms of knowledge base development, behavioral change, and patient care. Industrial quality models may focus on academic support services and processes, but educational quality models should be introduced in parallel to focus on educational standards and products. PMID:23745059

  8. Doctors or technicians: assessing quality of medical education.

    PubMed

    Hasan, Tayyab

    2010-01-01

    Medical education institutions usually adapt industrial quality management models that measure the quality of the process of a program but not the quality of the product. The purpose of this paper is to analyze the impact of industrial quality management models on medical education and students, and to highlight the importance of introducing a proper educational quality management model. Industrial quality management models can measure the training component in terms of competencies, but they lack the educational component measurement. These models use performance indicators to assess their process improvement efforts. Researchers suggest that the performance indicators used in educational institutions may only measure their fiscal efficiency without measuring the quality of the educational experience of the students. In most of the institutions, where industrial models are used for quality assurance, students are considered as customers and are provided with the maximum services and facilities possible. Institutions are required to fulfill a list of recommendations from the quality control agencies in order to enhance student satisfaction and to guarantee standard services. Quality of medical education should be assessed by measuring the impact of the educational program and quality improvement procedures in terms of knowledge base development, behavioral change, and patient care. Industrial quality models may focus on academic support services and processes, but educational quality models should be introduced in parallel to focus on educational standards and products.

  9. What should DOE do to help establish voluntary consensus standards for measuring and rating the performance of PV modules?

    NASA Technical Reports Server (NTRS)

    Runkle, L. D.

    1984-01-01

    In response to concern expressed by the photovoltaics community over progress toward the establishment and issuance of concensus standards on photovoltaic performance measurements, a review of the status of and progress in developing these standards was conducted. It examined the roles of manufacturers, and consumers and the national laboratories funded by the U.S. Department of Energy (DOE) in supporting this effort. This was done by means of a series of discussions with knowledgeable members of the photovoltaic community. Results of these interviews are summarized and a new approach to managing support of standards activity is recommended that responds to specific problems found in the performance measurement standards area. The study concludes that there is a positive role to be played by the U.S. Department of Energy in establishing collector performance measurement standards. It recommends that DOE continue to provide direct financial support for selected committees and for research at national laboratories, and that management of the activity be restructured to increase the authority and responsibility of the consensus committees.

  10. Performance management models for public health: Public Health Accreditation Board/Baldrige connections, alignment, and distinctions.

    PubMed

    Gorenflo, Grace G; Klater, David M; Mason, Marlene; Russo, Pamela; Rivera, Lillian

    2014-01-01

    The nationally known Malcolm Baldrige Award for Excellence ("Baldrige program") recognizes outstanding performance management and is specifically cited by the Public Health Accreditation Board (PHAB) as a potential framework for PHAB's requisite performance management system. The authors developed a crosswalk that identifies alignments between the 2 programs and is a highlight of the Quest for Exceptional Performance tool that is intended to help health departments capitalize on the connections between the 2 programs. To provide deeper insight into the most robust connections between the 2 programs. The authors developed a crosswalk by listing the PHAB measures, identifying corresponding Baldrige areas to address, and assigning a rating regarding the strength of the alignment. Subsequently, they generated a matrix with numerical scores reflecting the strength of the PHAB-Baldrige alignments that were then analyzed for frequency and strength of alignment by PHAB domain and by Baldrige category. The tool developers and 3 public health leaders with experience in the Baldrige program contributed to both the design and the analyses. The measures used reflected both the frequency and strength of alignments. Of the 123 alignments identified in the crosswalk, 39 were rated as high, 40 as medium, and 44 as low. The strongest connections were in the areas of performance management, quality improvement, strategic planning, workforce development, assessment and analysis, and customer service. While the areas with the most frequent and strongest connections provide the most useful basis for health departments pursuing Baldrige recognition or using Baldrige criteria as a framework for performance management, all alignments could be considered for both purposes.

  11. One Paradox in District Accountability and Site-Based Management.

    ERIC Educational Resources Information Center

    Shellman, David W.

    The paradox of site-based school management with use of standardized tests or instructional management systems that restrict teacher choices was evident in one school district in North Carolina in which measurement of student success has centered on student performance on state-mandated tests. A study was conducted to see if students whose…

  12. Managing Marginal School Employees: Applying Standards-Based Performance Measures

    ERIC Educational Resources Information Center

    Fields, Lynette; Reck, Brianne; Egley, Robert

    2006-01-01

    This book contains a collection of case studies that provide a variety of situations in managing or working with marginal employees in a school system. Managing Marginal School Employees will serve as a primary or companion text for administrator candidates or current administrators that include dilemmas for the student to think about, discuss,…

  13. An observational analysis of provider adherence to AUA guidelines on the management of benign prostatic hyperplasia.

    PubMed

    Auffenberg, Gregory B; Gonzalez, Chris M; Wolf, J Stuart; Clemens, J Quentin; Meeks, William; McVary, Kevin T

    2014-11-01

    We retrospectively evaluated urologist adherence to the AUA guidelines on the management of new patients with benign prostatic hyperplasia related lower urinary tract symptoms in a large university urology group. All first time benign prostatic hyperplasia/lower urinary tract symptom visits to the urology clinic at the Northwestern Medical Faculty Foundation between January 1, 2008 and December 31, 2012 were evaluated using an institutionally managed electronic medical record data repository. Clinical documentation and orders from each encounter were assessed to determine the rate of performance of guideline measures. Approximately 1% of all results were manually reviewed in a validation process designed to determine the reliability of the electronic medical record based system. A total of 3,494 eligible encounters were evaluated in the final analysis. Provider adherence rates with the 9 measures recommended in the guidelines varied by measure from 53.0% to 92.8%. The rate of performance of 5 not routinely recommended measures was 10.2% or less. Post-void residual and urinary flow measurement were optional measures, and were performed on 68.1% and 4.6% of new encounters respectively. Manual validation revealed the electronic medical record data extraction was concordant with manual review in 96.7% of cases (95% CI 94.8-98.5). Using electronic medical record based data extraction techniques, we reliably document a baseline adherence rate with AUA guidelines on the management of benign prostatic hyperplasia. Establishing this benchmark will be important for future investigation into patient outcomes related to guideline adherence and into methods for improving provider adherence. Copyright © 2014 American Urological Association Education and Research, Inc. Published by Elsevier Inc. All rights reserved.

  14. Reconsidering the measurement of ancillary service performance.

    PubMed

    Griffin, D T; Rauscher, J A

    1987-08-01

    Prospective payment reimbursement systems have forced hospitals to review their costs more carefully. The result of the increased emphasis on costs is that many hospitals use costs, rather than margin, to judge the performance of ancillary services. However, arbitrary selection of performance measures for ancillary services can result in managerial decisions contrary to hospital objectives. Managerial accounting systems provide models which assist in the development of performance measures for ancillary services. Selection of appropriate performance measures provides managers with the incentive to pursue goals congruent with those of the hospital overall. This article reviews the design and implementation of managerial accounting systems, and considers the impact of prospective payment systems and proposed changes in capital reimbursement on this process.

  15. Development of Generic Aircrew Measures of Performance for Distributed Mission Training

    DTIC Science & Technology

    2003-03-31

    collecte de données utiles sur les performances humaines représente des défis considérables. De plus, on ne trouvera pas deux essais d’IMD exactement...weapons Countered bandits offensive Very sound energy management and aircraft manoeuvering Quickly capitalized on offensive position...Effectively countered bandits offensive to a neutral position Ideal Aircraft energy management and manoeuvering Expeditiously capitalized on

  16. Integrated corridor management modeling results report : Dallas, Minneapolis, and San Diego.

    DOT National Transportation Integrated Search

    2012-02-01

    This executive summary documents the analysis methodologies, tools, and performance measures used to analyze Integrated Corridor Management (ICM) strategies; and presents high-level results for the successful implementation of ICM at three Stage 2 Pi...

  17. Assuring the Quality of Test Results in the Field of Nuclear Techniques and Ionizing Radiation. The Practical Implementation of Section 5.9 of the EN ISO/IEC 17025 Standard

    NASA Astrophysics Data System (ADS)

    Cucu, Daniela; Woods, Mike

    2008-08-01

    The paper aims to present a practical approach for testing laboratories to ensure the quality of their test results. It is based on the experience gained in assessing a large number of testing laboratories, discussing with management and staff, reviewing results obtained in national and international PTs and ILCs and exchanging information in the EA laboratory committee. According to EN ISO/IEC 17025, an accredited laboratory has to implement a programme to ensure the quality of its test results for each measurand. Pre-analytical, analytical and post-analytical measures shall be applied in a systematic manner. They shall include both quality control and quality assurance measures. When designing the quality assurance programme a laboratory should consider pre-analytical activities (like personnel training, selection and validation of test methods, qualifying equipment), analytical activities ranging from sampling, sample preparation, instrumental analysis and post-analytical activities (like decoding, calculation, use of statistical tests or packages, management of results). Designed on different levels (analyst, quality manager and technical manager), including a variety of measures, the programme shall ensure the validity and accuracy of test results, the adequacy of the management system, prove the laboratory's competence in performing tests under accreditation and last but not least show the comparability of test results. Laboratory management should establish performance targets and review periodically QC/QA results against them, implementing appropriate measures in case of non-compliance.

  18. Report: Performance Track Could Improve Program Design and Management to Ensure Value

    EPA Pesticide Factsheets

    Report #2007-P-00013, March 29, 2007. We found that Performance Track did not have clear plans that connected activities with its goals, and did not have performance measures that show if it achieves anticipated results.

  19. Chasing the silver bullet: measuring driver fatigue using simple and complex tasks.

    PubMed

    Baulk, S D; Biggs, S N; Reid, K J; van den Heuvel, C J; Dawson, D

    2008-01-01

    Driver fatigue remains a significant cause of motor-vehicle accidents worldwide. New technologies are increasingly utilised to improve road safety, but there are no effective on-road measures for fatigue. While simulated driving tasks are sensitive, and simple performance tasks have been used in industrial fatigue management systems (FMS) to quantify risk, little is known about the relationship between such measures. Establishing a simple, on-road measure of fatigue, as a fitness-to-drive tool, is an important issue for road safety and accident prevention, particularly as many fatigue related accidents are preventable. This study aimed to measure fatigue-related performance decrements using a simple task (reaction time - RT) and a complex task (driving simulation), and to determine the potential for a link between such measures, thus improving FMS success. Fifteen volunteer participants (7 m, 8 f) aged 22-56 years (mean 33.6 years), underwent 26 h of supervised wakefulness before an 8h recovery sleep opportunity. Participants were tested using a 30-min interactive driving simulation test, bracketed by a 10-min psychomotor vigilance task (PVT) at 4, 8, 18 and 24h of wakefulness, and following recovery sleep. Extended wakefulness caused significant decrements in PVT and driving performance. Although these measures are clearly linked, our analyses suggest that driving simulation cannot be replaced by a simple PVT. Further research is needed to closely examine links between performance measures, and to facilitate accurate management of fitness to drive, which requires more complex assessments of performance than RT alone.

  20. Hospital implementation of health information technology and quality of care: are they related?

    PubMed

    Restuccia, Joseph D; Cohen, Alan B; Horwitt, Jedediah N; Shwartz, Michael

    2012-09-27

    Recently, there has been considerable effort to promote the use of health information technology (HIT) in order to improve health care quality. However, relatively little is known about the extent to which HIT implementation is associated with hospital patient care quality. We undertook this study to determine the association of various HITs with: hospital quality improvement (QI) practices and strategies; adherence to process of care measures; risk-adjusted inpatient mortality; patient satisfaction; and assessment of patient care quality by hospital quality managers and front-line clinicians. We conducted surveys of quality managers and front-line clinicians (physicians and nurses) in 470 short-term, general hospitals to obtain data on hospitals' extent of HIT implementation, QI practices and strategies, assessments of quality performance, commitment to quality, and sufficiency of resources for QI. Of the 470 hospitals, 401 submitted complete data necessary for analysis. We also developed measures of hospital performance from several publicly data available sources: Hospital Compare adherence to process of care measures; Medicare Provider Analysis and Review (MEDPAR) file; and Hospital Consumer Assessment of Healthcare Providers and Systems HCAHPS® survey. We used Poisson regression analysis to examine the association between HIT implementation and QI practices and strategies, and general linear models to examine the relationship between HIT implementation and hospital performance measures. Controlling for potential confounders, we found that hospitals with high levels of HIT implementation engaged in a statistically significant greater number of QI practices and strategies, and had significantly better performance on mortality rates, patient satisfaction measures, and assessments of patient care quality by hospital quality managers; there was weaker evidence of higher assessments of patient care quality by front-line clinicians. Hospital implementation of HIT was positively associated with activities intended to improve patient care quality and with higher performance on four of six performance measures.

  1. Making Health System Performance Measurement Useful to Policy Makers: Aligning Strategies, Measurement and Local Health System Accountability in Ontario

    PubMed Central

    Veillard, Jeremy; Huynh, Tai; Ardal, Sten; Kadandale, Sowmya; Klazinga, Niek S.; Brown, Adalsteinn D.

    2010-01-01

    This study examined the experience of the Ontario Ministry of Health and Long-Term Care in enhancing its stewardship and performance management role by developing a health system strategy map and a strategy-based scorecard through a process of policy reviews and expert consultations, and linking them to accountability agreements. An evaluation of the implementation and of the effects of the policy intervention has been carried out through direct policy observation over three years, document analysis, interviews with decision-makers and systematic discussion of findings with other authors and external reviewers. Cascading strategies at health and local health system levels were identified, and a core set of health system and local health system performance indicators was selected and incorporated into accountability agreements with the Local Health Integration Networks. despite the persistence of such challenges as measurement limitations and lack of systematic linkage to decision-making processes, these activities helped to strengthen substantially the ministry's performance management function. PMID:21286268

  2. The role of disease management in pay-for-performance programs for improving the care of chronically ill patients.

    PubMed

    Beich, Jeff; Scanlon, Dennis P; Ulbrecht, Jan; Ford, Eric W; Ibrahim, Ibrahim A

    2006-02-01

    To date, pay-for-performance programs targeting the care of persons with chronic conditions have primarily been directed at physicians and provide an alternative to health plan-sponsored chronic disease management (DM) programs. Both approaches require similar infrastructure, and each has its own advantages and disadvantages for program implementation. Pay-for-performance programs use incentives based on patient outcomes; however, an alternative system might incorporate measures of structure and process. Using a conceptual framework, the authors explore the variation in 50 diabetes DM programs using data from the 2002 National Business Coalition on Health's eValue8 Request for Information (RFI). The authors raise issues relevant to the assignment of accountability for patient outcomes to either health plans or physicians. They analyze the association between RFI scores measuring structures and processes, and HEDIS diabetes intermediate outcome measures. Finally, the strengths and weaknesses of using the RFI scores as an alternative metric for pay-for-performance programs are discussed.

  3. [Organizational climate in management teams and its relationship with health care outcomes].

    PubMed

    Peña-Viveros, Raúl; Hernández-Hernández, Dulce María; Vélez-Moreno, Ana María Luz; García-Sandoval, Martha Gabriela; Reyes-Tellez, María Araceli; Ureña-Bogarin, Enrique L

    2015-01-01

    To identify the relationship between organizational climate of management teams and the performance of health services. A transversal and analytical study was designed. The Organizational Climate Scale (OCS) was utilized and performance was assessed by the achievement indicators through correlation analysis and multiple regression. Thirty four medical benefits services headquarters (JSPM) were measured of the Mexican Social Security Institute. Of 862 participating, 238 (27.6%) evaluated the climate of their organizations with a high level; the maximal score was 56%. Average performance value was 0.79 ± 0.07 (minimal: 0.65; maximal: 0.92). A positive correlation was demonstrated between organizational climate level and performance (r=0.4; p=0.008). The organizational climate of the health services managers (JSPM) is directly related with performance in health care.

  4. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  5. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less

  6. "Building the Perfect Beast": Assessing the Effects of CMI (Computer-Managed Instruction) on the Teaching of, and Student Writing about, Literature.

    ERIC Educational Resources Information Center

    Widdicombe, Richard Toby

    Measuring the effects of computer-managed instruction (CMI) on the teaching of and student writing about literature involves more than having students write and then evaluating their performance. Measurement is made difficult by the fact that the computer technology used in instruction is in a state of flux. Variation of computer technology,…

  7. Useful measures and models for analytical quality management in medical laboratories.

    PubMed

    Westgard, James O

    2016-02-01

    The 2014 Milan Conference "Defining analytical performance goals 15 years after the Stockholm Conference" initiated a new discussion of issues concerning goals for precision, trueness or bias, total analytical error (TAE), and measurement uncertainty (MU). Goal-setting models are critical for analytical quality management, along with error models, quality-assessment models, quality-planning models, as well as comprehensive models for quality management systems. There are also critical underlying issues, such as an emphasis on MU to the possible exclusion of TAE and a corresponding preference for separate precision and bias goals instead of a combined total error goal. This opinion recommends careful consideration of the differences in the concepts of accuracy and traceability and the appropriateness of different measures, particularly TAE as a measure of accuracy and MU as a measure of traceability. TAE is essential to manage quality within a medical laboratory and MU and trueness are essential to achieve comparability of results across laboratories. With this perspective, laboratory scientists can better understand the many measures and models needed for analytical quality management and assess their usefulness for practical applications in medical laboratories.

  8. Typological review of environmental performance metrics (with illustrative examples for oil spill response).

    PubMed

    Seager, Thomas P; Satterstrom, F Kyle; Linkov, Igor; Tuler, Seth P; Kay, Rebecca

    2007-07-01

    An intensification of interest in environmental assessment during the last 2 decades has driven corporate efforts to better document environmental goals, improve environmental management systems, and increase awareness of the environmental and ecological effects of business operations. This trend has been motivated partly by regulatory requirements (such as the Toxics Release Inventory in the United States) and partly by the inclination of some large manufacturing firms to embrace a broader social and environmental mission characterized as "sustainability" or "ecoefficiency." Moreover, the importance of measurable objectives in the US government has been recognized at least since the Government Performance Results Act of 1993, which was intended to both improve the efficiency of government and the confidence of the American public in government managers. However, in management of environmental crises - such as catastrophic oil or chemical spills - development of measurable performance standards has lagged. Consequently, government spill managers are unable to define success in terms that are easily communicated to public and other stakeholder groups, and they could be disadvantaged in their efforts to deploy response resources with maximum efficiency. In this paper, we present a typological review of environmental assessment measures and summarize some of the current practices and strategic goals among federal agencies with regard to oil and chemical spills. A general approach to organizing metrics for oil spill response, restoration, and recovery is also presented. The results could improve planning efforts and communication among different federal, state, and local agencies and public or stakeholder groups involved in spill management.

  9. Observing practice leadership in intellectual and developmental disability services.

    PubMed

    Beadle-Brown, J; Bigby, C; Bould, E

    2015-12-01

    Improving staff performance is an issue in services for people with intellectual disability. Practice leadership, where the front line leader of a staff team focuses on service user outcomes in everything they do and provides coaching, modeling, supervision and organisation to the team, has been identified as important in improving staff performance. To date this finding is based only on self-report measures. This paper describes and tests an observational measure of practice leadership based on an interview with the front-line manager, a review of paperwork and observations in 58 disability services in Australia. The measure showed good internal consistency and acceptable inter-rater reliability. Practice leadership was associated with staff practice and outcomes for service users. The observed measure of practice leadership appears to be a useful tool for assessing whether leadership within a service promotes enabling and empowering support by staff. It was found to discriminate higher and lower performing services in terms of active support. The measure had good reliability and validity although some further testing is required to give a complete picture of the possible uses and reliability of the measure. The measure is potentially useful in contexts of both research and service development. The confirmation of previous findings from self-report measures that practice leadership is related to the quality of staff practice and outcomes for service users has implications for policy and practice in terms of the training of managers and structures for organisational management. © 2015 MENCAP and International Association of the Scientific Study of Intellectual and Developmental Disabilities and John Wiley & Sons Ltd.

  10. Comparison of information theoretic divergences for sensor management

    NASA Astrophysics Data System (ADS)

    Yang, Chun; Kadar, Ivan; Blasch, Erik; Bakich, Michael

    2011-06-01

    In this paper, we compare the information-theoretic metrics of the Kullback-Leibler (K-L) and Renyi (α) divergence formulations for sensor management. Information-theoretic metrics have been well suited for sensor management as they afford comparisons between distributions resulting from different types of sensors under different actions. The difference in distributions can also be measured as entropy formulations to discern the communication channel capacity (i.e., Shannon limit). In this paper, we formulate a sensor management scenario for target tracking and compare various metrics for performance evaluation as a function of the design parameter (α) so as to determine which measures might be appropriate for sensor management given the dynamics of the scenario and design parameter.

  11. Performance of residents and anesthesiologists in a simulation-based skill assessment.

    PubMed

    Murray, David J; Boulet, John R; Avidan, Michael; Kras, Joseph F; Henrichs, Bernadette; Woodhouse, Julie; Evers, Alex S

    2007-11-01

    Anesthesiologists and anesthesia residents are expected to acquire and maintain skills to manage a wide range of acute intraoperative anesthetic events. The purpose of this study was to determine whether an inventory of simulated intraoperative scenarios provided a reliable and valid measure of anesthesia residents' and anesthesiologists' skill. Twelve simulated acute intraoperative scenarios were designed to assess the performance of 64 residents and 35 anesthesiologists. The participants were divided into four groups based on their training and experience. There were 31 new CA-1, 12 advanced CA-1, and 22 CA-2/CA-3 residents as well as a group of 35 experienced anesthesiologists who participated in the assessment. Each participant managed a set of simulated events. The advanced CA-1 residents, CA-2/CA-3 residents, and 35 anesthesiologists managed 8 of 12 intraoperative simulation exercises. The 31 CA-1 residents each managed 3 intraoperative scenarios. The new CA-1 residents received lower scores on the simulated intraoperative events than the other groups of participants. The advanced CA-1 residents, CA-2/CA-3 residents, and anesthesiologists performed similarly on the overall assessment. There was a wide range of scores obtained by individuals in each group. A number of the exercises were difficult for the majority of participants to recognize and treat, but most events effectively discriminated among participants who achieved higher and lower overall scores. This simulation-based assessment provided a valid method to distinguish the skills of more experienced anesthesia residents and anesthesiologists from residents in early training. The overall score provided a reliable measure of a participant's ability to recognize and manage simulated acute intraoperative events. Additional studies are needed to determine whether these simulation-based assessments are valid measures of clinical performance.

  12. In Vivo Monitoring Program Manual, PNL-MA-574

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynch, Timothy P.

    2010-07-01

    An overview of the administration for the In Vivo Monitoring Program (IVMP) for Hanford. This includes organizational structure and program responsibilities; coordination of in vivo measurements; scheduling measurements; performing measurements; reporting results; and quality assurance. Overall responsibility for the management of the IVMP rests with the Program Manager (PM). The PM is responsible for providing the required in vivo counting services for Hanford Site contractor employees in accordance with Department of Energy (DOE) requirements and the specific statements of work.

  13. Evaluating Library Staff: A Performance Appraisal System.

    ERIC Educational Resources Information Center

    Belcastro, Patricia

    This manual provides librarians and library managers with a performance appraisal system that measures staff fairly and objectively and links performance to the goals of the library. The following topics are addressed: (1) identifying expectations for quality service or standards of performance; (2) the importance of a library's code of service,…

  14. Identifying instruments to quantify financial management skills in adults with acquired cognitive impairments.

    PubMed

    Engel, Lisa; Bar, Yael; Beaton, Dorcas E; Green, Robin E; Dawson, Deirdre R

    2016-01-01

    Financial management skills-that is, the skills needed to handle personal finances such as banking and paying bills-are essential to a person's autonomy, independence, and community living. To date, no comprehensive review of financial management skills instruments exists, making it difficult for clinicians and researchers to choose relevant instruments. The objectives of this review are to: (a) identify all available instruments containing financial management skill items that have been used with adults with acquired cognitive impairments; (b) categorize the instruments by source (i.e., observation based, self-report, proxy report); and (c) describe observation-based performance instruments by populations, overarching concepts measured, and comprehensiveness of financial management items. Objective (c) focuses on observation-based performance instruments as these measures can aid in situations where the person with cognitive impairment has poor self-awareness or where the proxy has poor knowledge of the person's current abilities. Two reviewers completed two systematic searches of five databases. Instruments were categorized by reviewing published literature, copies of the instruments, and/or communication with instrument authors. Comprehensiveness of items was based on nine key domains of financial management skills developed by the authors. A total of 88 discrete instruments were identified. Of these, 44 were categorized as observation-based performance and 44 as self- and/or proxy-reports. Of the 44 observation-based performance instruments, 8 had been developed for acquired brain injury populations and 24 for aging and dementia populations. Only 7 of the observation-based performance instruments had items spanning 6 or more of the 9 financial management skills domains. The majority of instruments were developed for aging and dementia populations, and few were comprehensive. This review provides foundation for future instrument psychometric and clinimetric reviews. It a necessary first step in providing information to support decision making for clinicians and researchers selecting financial management skills instruments.

  15. Management by Objectives: A Program of Measured Performance.

    ERIC Educational Resources Information Center

    Block, Philip

    1980-01-01

    Management by objectives (MBO) is defined and an MBO program adapted for clinic services of a college of podiatric medicine is presented. Major steps with specific examples for goal setting, action planning, self-control, and periodic review are outlined. (Author/MLW)

  16. [OR-management and self-improvement - a discrepancy?].

    PubMed

    Casutt, Mattias; Konrad, Christoph; Schüpfer, Guido

    2014-10-01

    Today, operating room management is essential for a modern hospital. The strategic controls of this cost-intensive area and the ongoing cost pressure have necessitated management attention to this area. Economical, processual and quality data are well-known and established, although analysis of different health delivering organisations by benchmarking is still difficult. It remains still a severe task for the management of an OR and anaesthesia department. For these fields data is needed to identify and measure the performance of these departments in the dimensions of finances, development, processes and patient's needs. The key performance indicators are exemplified for an anaesthesia department and discussed. © Georg Thieme Verlag Stuttgart · New York.

  17. Disease management as a performance improvement strategy.

    PubMed

    McClatchey, S

    2001-11-01

    Disease management is a strategy of organizing care and services for a patient population across the continuum. It is characterized by a population database, interdisciplinary and interagency collaboration, and evidence-based clinical information. The effectiveness of a disease management program has been measured by a combination of clinical, financial, and quality of life outcomes. In early 1997, driven by a strategic planning process that established three Centers of Excellence (COE), we implemented disease management as the foundation for a new approach to performance improvement utilizing five key strategies. The five implementation strategies are outlined, in addition to a review of the key elements in outcome achievement.

  18. Introducing the Balanced Scorecard: Creating Metrics to Measure Performance

    ERIC Educational Resources Information Center

    Gumbus, Andra

    2005-01-01

    This experiential exercise presents the concept of the Balanced Scorecard (BSC) and applies it in a university setting. The Balanced Scorecard was developed 12 years ago and has grown in popularity and is used by more than 50% of the Fortune 500 companies as a performance measurement and strategic management tool. The BSC expands the traditional…

  19. Faustmann and the forestry tradition of outcome-based performance measures

    Treesearch

    Peter J. Ince

    1999-01-01

    The concept of land expectation value developed by Martin Faustmann may serve as a paradigm for outcome-based performance measures in public forest management if the concept of forest equity value is broadened to include social and environmental benefits and costs, and sustainability. However, anticipation and accurate evaluation of all benefits and costs appears to...

  20. Intelligent Performance Analysis with a Natural Language Interface

    NASA Astrophysics Data System (ADS)

    Juuso, Esko K.

    2017-09-01

    Performance improvement is taken as the primary goal in the asset management. Advanced data analysis is needed to efficiently integrate condition monitoring data into the operation and maintenance. Intelligent stress and condition indices have been developed for control and condition monitoring by combining generalized norms with efficient nonlinear scaling. These nonlinear scaling methodologies can also be used to handle performance measures used for management since management oriented indicators can be presented in the same scale as intelligent condition and stress indices. Performance indicators are responses of the process, machine or system to the stress contributions analyzed from process and condition monitoring data. Scaled values are directly used in intelligent temporal analysis to calculate fluctuations and trends. All these methodologies can be used in prognostics and fatigue prediction. The meanings of the variables are beneficial in extracting expert knowledge and representing information in natural language. The idea of dividing the problems into the variable specific meanings and the directions of interactions provides various improvements for performance monitoring and decision making. The integrated temporal analysis and uncertainty processing facilitates the efficient use of domain expertise. Measurements can be monitored with generalized statistical process control (GSPC) based on the same scaling functions.

  1. Indicator-based systems of performance management in the National Health Service: a comparison of the perceptions of local- and national-level managers.

    PubMed

    Jones, G T

    2000-02-01

    Historically, the UK Government has policed the use of National Health Service (NHS) resources through the centralization of control. With the majority of resource-draining decisions being taken by clinicians, however, professional financial accountability is becoming more important within the NHS management structure. Variations in clinical performance can be monitored through the use of performance indicators, although these are not without their problems. The use of league tables of such indicators in the national press is now infamous and there is much anecdotal evidence about the intraorganizational conflict arising from the use of such tables. A questionnaire survey and interview study of clinical directors, clinical service directors and business managers in several Scottish NHS Trusts was undertaken to ascertain the perceptions of local-level managers on the issue of performance indicators. Interviews were also carried out with a number of personnel in the Scottish Office Department of Economics and Information, the Division of Health Gain and the Finance Directorate. This paper explores the differences between the perceptions of the managers at these two levels of the NHS with regards to issues of performance measurement, intraorganizational conflict and corporate vision.

  2. Measuring Information Security Performance with 10 by 10 Model for Holistic State Evaluation.

    PubMed

    Bernik, Igor; Prislan, Kaja

    Organizations should measure their information security performance if they wish to take the right decisions and develop it in line with their security needs. Since the measurement of information security is generally underdeveloped in practice and many organizations find the existing recommendations too complex, the paper presents a solution in the form of a 10 by 10 information security performance measurement model. The model-ISP 10×10M is composed of ten critical success factors, 100 key performance indicators and 6 performance levels. Its content was devised on the basis of findings presented in the current research studies and standards, while its structure results from an empirical research conducted among information security professionals from Slovenia. Results of the study show that a high level of information security performance is mostly dependent on measures aimed at managing information risks, employees and information sources, while formal and environmental factors have a lesser impact. Experts believe that information security should evolve systematically, where it's recommended that beginning steps include technical, logical and physical security controls, while advanced activities should relate predominantly strategic management activities. By applying the proposed model, organizations are able to determine the actual level of information security performance based on the weighted indexing technique. In this manner they identify the measures they ought to develop in order to improve the current situation. The ISP 10×10M is a useful tool for conducting internal system evaluations and decision-making. It may also be applied to a larger sample of organizations in order to determine the general state-of-play for research purposes.

  3. 48 CFR 4.602 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and the general public; (2) A means of measuring and assessing the effect of Federal contracting on... means of measuring and assessing the effect of Federal contracting for promoting sustainable... measuring and assessing the effect of other policy and management initiatives (e.g., performance based...

  4. 48 CFR 4.602 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and the general public; (2) A means of measuring and assessing the effect of Federal contracting on... means of measuring and assessing the effect of Federal contracting for promoting sustainable... measuring and assessing the effect of other policy and management initiatives (e.g., performance based...

  5. New thinking on how to link executive pay with performance.

    PubMed

    Rappaport, A

    1999-01-01

    As the stock market began its ascent in the mid-1990s, executive pay--always the subject of heated debate--mounted along with it. That's because among the largest U.S. companies, stock options now account for more than half of total CEO compensation and about 30% of senior operating managers' pay. One problem became particularly clear during the bull market's astonishing run: even below-average performers reap huge gains from stock options when the market is rising rapidly. The author proposes steps to close the gap between existing compensation practices and those needed to promote higher levels of achievement at all levels of the corporation. For top managers, he recommends replacing conventional stock options with options that are tied to a market or peer index. Below-average performers would not be rewarded under such plans; superior performers could, depending on the way plans were structured, receive even more. He notes that managers at the business unit level should not be judged on the company's stock price--over which they have little control--and advocates an approach that accurately measures the value added by each unit. Finally, he suggests how certain indicators of value can be used to measure the contribution of frontline managers and employees. The concept of pay for performance has gained wide acceptance, but the link between incentive pay and superior performance is still too weak. Reforms must be adopted at all levels of the organization. Shareholders will applaud changes in pay schemes that motivate companies to deliver more value.

  6. Performance assessment in complex individual and team tasks

    NASA Technical Reports Server (NTRS)

    Eddy, Douglas R.

    1992-01-01

    Described here is an eclectic, performance based approach to assessing cognitive performance from multiple perspectives. The experience gained from assessing the effects of antihistamines and scenario difficulty on C (exp 2) decision making performance in Airborne Warning and Control Systems (AWACS) weapons director (WD) teams can serve as a model for realistic simulations in space operations. Emphasis is placed on the flexibility of measurement, hierarchical organization of measurement levels, data collection from multiple perspectives, and the difficulty of managing large amounts of data.

  7. Analyses Relating to Pavement Material Characterizations and Their Effects......

    DOT National Transportation Integrated Search

    1998-01-01

    This report presents the analysis conducted on relating pavement performance or response measures and design considerations to specific pavement layers utilizing data contained in the Long Term Pavement Performance Program National Information Manage...

  8. Mobility and reliability performance measurement.

    DOT National Transportation Integrated Search

    2013-06-01

    This project grew out of the fact that mobility was identified early on as one of the key performance focus areas of NCDOTs : strategic transformation effort. The Transformation Management Team (TMT) established a TMT Mobility Workstream Team : in...

  9. Next Generation Performance Monitoring Data Needs for Nevada DOT

    DOT National Transportation Integrated Search

    2014-12-24

    This report examines state-of-practice for performance measurement and focuses on federal requirements for traveler information mandated by SAFETEA-LU Section 1201 Real-Time System Management Information Program. Guidance for November 2016 compliance...

  10. The structure of cockpit management attitudes

    NASA Technical Reports Server (NTRS)

    Gregorich, S. E.; Helmreich, R. L.; Wilhelm, J. A.

    1990-01-01

    A revised version of the Cockpit Management Attitudes Questionnaire (CMAQ) is introduced. Factor analyses of responses from 3 different samples reveal comparable factor structure (previous attempts to factor analyze this measure had produced equivocal results). Implications for the measurement of attitudes and the assessment of attitude change are discussed. It is argued that the CMAQ will benefit both special training programs and efforts to explore attitude-performance linkages in air-transport operations.

  11. Child Protection and Case Management Team Performance Evaluation Tool (CPCMT P.E.T.).

    DTIC Science & Technology

    1982-05-01

    audit): ( 1 ) Structural measures - the environment, physical facilities, personnel capability, and organizational characteristics of the program (e.g...Need objective criteria for the measurement - define terms . Examples: Under organization, what is ( 1 ) "complete interdisciplinary composition" and (5...VATALOG NUMBER Health Care Studies Div Rpt #82-00 1 4. TITLE (and SubtUo) S. TYPE OF REPORT & PERIOD COVERED Child Protection and Case Management Team

  12. Combat Mission Training Research at the 58th Special Operations Wing: A Summary

    DTIC Science & Technology

    1998-07-01

    Air Force Base during 1995-1997. The first study examined the relationship between crew resource management ( CRM ) processes and mission performance for...next three sections, we summarize the three major empirical studies that were conducted: (a) measuring crew resource management ( CRM ) behaviors... customized measurement procedures and data collection instruments. At the squadron level, there are two problems in implementing an effective CRM training

  13. Improving transportation systems management and operations (TSM&O), capability maturity model workshop white paper : performance measurement.

    DOT National Transportation Integrated Search

    2015-04-01

    Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...

  14. Internet Training Resulted in Improved Trainee Performance in a Simulated Opioid-Poisoned Patient as Measured by Checklist.

    PubMed

    Kim, Hong; Heverling, Harry; Cordeiro, Michael; Vasquez, Vanessa; Stolbach, Andrew

    2016-09-01

    Opioid overdose is a leading cause of death in the USA. Internet-based teaching can improve medical knowledge among trainees, but there are limited data to show the effect of Internet-based teaching on clinical competence in medical training, including management of opioid poisoning. We used an ecological design to assess the effect of an Internet-based teaching module on the management of a simulated opioid-poisoned patient. We enrolled two consecutive classes of post-graduate year-1 residents from a single emergency medicine program. The first group (RA) was instructed to read a toxicology textbook chapter and the second group (IT) took a brief Internet training module. All participants subsequently managed a simulated opioid-poisoned patient. The participants' performance was evaluated with two types of checklist (simple and time-weighted), along with global assessment scores. Internet-trained participants performed better on both checklist scales. The difference between mean simple checklist scores by the IT and RA groups was 0.23 (95 % CI, 0.016-0.44). The difference between mean time-weighted checklist scores was 0.27 (95 % CI, 0.048-0.49). When measured by global assessment, there was no statistically significant difference between RA and IT participants. These data suggest that the Internet module taught basic principles of management of the opioid-poisoned patient. In this scenario, global assessment and checklist assessment may not measure the same proficiencies. These encouraging results are not sufficient to show that this Internet tool improves clinical performance. We should assess the impact of the Internet module on performance in a true clinical environment.

  15. Health maintenance organization (HMO) performance and consumer complaints: an empirical study of frustrating HMO activities.

    PubMed

    Born, Patricia H; Query, J Tim

    2004-01-01

    Growing public interest in the operations of managed care plans has fueled a variety of activities to collect and analyze their performance. These activities include studies of financial performance, analysis of enrollment decisions, and, more recently, the development of systems for measuring healthcare quality to improve accountability to consumers. In this study, the authors focus on the activities of managed care plans that may frustrate patients and providers and, subsequently, motivate patients to file complaints. Using data from three sources, they evaluate the relationships between complaints against managed care plans and two metrics of performance: (a) the financial performance of the plan, and (b) the quality of care provided. Their findings indicate that complaints against health maintenance organizations are significantly related to the plans' levels of quality and to actions that may impede access to care.

  16. Business process performance measurement: a structured literature review of indicators, measures and metrics.

    PubMed

    Van Looy, Amy; Shafagatova, Aygun

    2016-01-01

    Measuring the performance of business processes has become a central issue in both academia and business, since organizations are challenged to achieve effective and efficient results. Applying performance measurement models to this purpose ensures alignment with a business strategy, which implies that the choice of performance indicators is organization-dependent. Nonetheless, such measurement models generally suffer from a lack of guidance regarding the performance indicators that exist and how they can be concretized in practice. To fill this gap, we conducted a structured literature review to find patterns or trends in the research on business process performance measurement. The study also documents an extended list of 140 process-related performance indicators in a systematic manner by further categorizing them into 11 performance perspectives in order to gain a holistic view. Managers and scholars can consult the provided list to choose the indicators that are of interest to them, considering each perspective. The structured literature review concludes with avenues for further research.

  17. Measuring the Value Added of Management: A Knowledge Value Added Approach

    DTIC Science & Technology

    2006-12-31

    Dark Matter ” ................................................................3 Difficult-to-track Dark Matter Outputs .................................................5 Computing Metaphor..........................................................................6 Dark Matter Correlates with Market Performance ..............................8 Outputs of Dark Matter .......................................................................9 Operationalizing: The Measurement of Dark

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prod'homme, A.; Drouvot, O.; Gregory, J.

    In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) atmore » the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)« less

  19. Dutch healthcare reform: did it result in performance improvement of health plans? A comparison of consumer experiences over time.

    PubMed

    Hendriks, Michelle; Spreeuwenberg, Peter; Rademakers, Jany; Delnoij, Diana M J

    2009-09-17

    Many countries have introduced elements of managed competition in their healthcare system with the aim to accomplish more efficient and demand-driven health care. Simultaneously, generating and reporting of comparative healthcare information has become an important quality-improvement instrument. We examined whether the introduction of managed competition in the Dutch healthcare system along with public reporting of quality information was associated with performance improvement in health plans. Experiences of consumers with their health plan were measured in four consecutive years (2005-2008) using the CQI(R) health plan instrument 'Experiences with Healthcare and Health Insurer'. Data were available of 13,819 respondents (response = 45%) of 30 health plans in 2005, of 8,266 respondents (response = 39%) of 32 health plans in 2006, of 8,088 respondents (response = 34%) of 32 health plans in 2007, and of 7,183 respondents (response = 31%) of 32 health plans in 2008. We performed multilevel regression analyses with three levels: respondent, health plan and year of measurement. Per year and per quality aspect, we estimated health plan means while adjusting for consumers' age, education and self-reported health status. We tested for linear and quadratic time effects using chi-squares. The overall performance of health plans increased significantly from 2005 to 2008 on four quality aspects. For three other aspects, we found that the overall performance first declined and then increased from 2006 to 2008, but the performance in 2008 was not better than in 2005. The overall performance of health plans did not improve more often for quality aspects that were identified as important areas of improvement in the first year of measurement. On six out of seven aspects, the performance of health plans that scored below average in 2005 increased more than the performance of health plans that scored average and/or above average in that year. We found mixed results concerning the effects of managed competition on the performance of health plans. To determine whether managed competition in the healthcare system leads to quality improvement in health plans, it is important to examine whether and for what reasons health plans initiate improvement efforts.

  20. Rethinking Social Desirability Scales: From Impression Management to Interpersonally Oriented Self-Control.

    PubMed

    Uziel, Liad

    2010-05-01

    Social desirability (specifically, impression management) scales are widely used by researchers and practitioners to screen individuals who bias self-reports in a self-favoring manner. These scales also serve to identify individuals at risk for psychological and health problems. The present review explores the evidence with regard to the ability of these scales to achieve these objectives. In the first part of the review, I present six criteria to evaluate impression management scales and conclude that they are unsatisfactory as measures of response style. Next, I explore what individual differences in impression management scores actually do measure. I compare two approaches: a defensiveness approach, which argues that these scales measure defensiveness that stems from vulnerable self-esteem, and an adjustment approach, which suggests that impression management is associated with personal well-being and interpersonal adjustment. Data from a wide variety of fields including social behavior, affect and well-being, health, and job performance tend to favor the adjustment approach. Finally, I argue that scales measuring impression management should be redefined as measures of interpersonally oriented self-control that identify individuals who demonstrate high levels of self-control, especially in social contexts. © The Author(s) 2010.

  1. Influence of organizational factors on safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haber, S.B.; Metlay, D.S.; Crouch, D.A.

    There is a need for a better understanding of exactly how organizational management factors at a nuclear power plant (NPP) affect plant safety performance, either directly or indirectly, and how these factors might be observed, measured, and evaluated. The purpose of this research project is to respond to that need by developing a general methodology for characterizing these organizational and management factors, systematically collecting information on their status and integrating that information into various types of evaluative activities. Research to date has included the development of the Nuclear Organization and Management Analysis Concept (NOMAC) of a NPP, the identification ofmore » key organizational and management factors, and the identification of the methods for systematically measuring and analyzing the influence of these factors on performance. Most recently, two field studies, one at a fossil fuel plant and the other at a NPP, were conducted using the developed methodology. Results are presented from both studies highlighting the acceptability, practicality, and usefulness of the methods used to assess the influence of various organizational and management factors including culture, communication, decision-making, standardization, and oversight. 6 refs., 3 figs., 1 tab.« less

  2. A Map for Clinical Laboratories Management Indicators in the Intelligent Dashboard

    PubMed Central

    Azadmanjir, Zahra; Torabi, Mashallah; Safdari, Reza; Bayat, Maryam; Golmahi, Fatemeh

    2015-01-01

    Introduction: management challenges of clinical laboratories are more complicated for educational hospital clinical laboratories. Managers can use tools of business intelligence (BI), such as information dashboards that provide the possibility of intelligent decision-making and problem solving about increasing income, reducing spending, utilization management and even improving quality. Critical phase of dashboard design is setting indicators and modeling causal relations between them. The paper describes the process of creating a map for laboratory dashboard. Methods: the study is one part of an action research that begins from 2012 by innovation initiative for implementing laboratory intelligent dashboard. Laboratories management problems were determined in educational hospitals by the brainstorming sessions. Then, with regard to the problems key performance indicators (KPIs) specified. Results: the map of indicators designed in form of three layered. They have a causal relationship so that issues measured in the subsequent layers affect issues measured in the prime layers. Conclusion: the proposed indicator map can be the base of performance monitoring. However, these indicators can be modified to improve during iterations of dashboard designing process. PMID:26483593

  3. Status quo and current trends of operating room management in Germany.

    PubMed

    Baumgart, André; Schüpfer, Guido; Welker, Andreas; Bender, Hans-Joachim; Schleppers, Alexander

    2010-04-01

    Ongoing healthcare reforms in Germany have required strenuous efforts to adapt hospital and operating room organizations to the needs of patients, new technological developments, and social and economic demands. This review addresses the major developments in German operating room management research and current practice. The introduction of the diagnosis-related group system in 2003 has changed the incentive structure of German hospitals to redesign their operating room units. The role of operating room managers has been gradually changing in hospitals in response to the change in the reimbursement system. Operating room managers are today specifically qualified and increasingly externally hired staff. They are more and more empowered with authority to plan and control operating rooms as profit centers. For measuring performance, common perioperative performance indicators are still scarcely implemented in German hospitals. In 2008, a concerted time glossary was established to enable consistent monitoring of operating room performance with generally accepted process indicators. These key performance indicators are a consistent way to make a procedure or case - and also the effectiveness of the operating room management - more transparent. In the presence of increasing financial pressure, a hospital's executives need to empower an independent operating room management function to achieve the hospital's economic goals. Operating room managers need to adopt evidence-based methods also from other scientific fields, for example management science and information technology, to further sustain operating room performance.

  4. Emergency in the clinic: a simulation curriculum to improve outpatient safety.

    PubMed

    Espey, Eve; Baty, Gillian; Rask, John; Chungtuyco, Michelle; Pereda, Brenda; Leeman, Lawrence

    2017-12-01

    Emergency response skills are essential when events such as seizure, anaphylaxis, or hemorrhage occur in the outpatient setting. As services and procedures increasingly move outside the hospital, training to manage complications may improve outcomes. The objective of this study was to evaluate a simulation-based curriculum in outpatient emergency management skills with the outcome measures of graded objective performance and learner self-efficacy. This pre- and postcurriculum study enrolled residents and fellows in Obstetrics and Gynecology and Family Medicine in a simulation-based, outpatient emergency management curriculum. Learners completed self-efficacy questionnaires and were videotaped managing 3 medical emergency scenarios (seizure, over-sedation/cardiopulmonary arrest, and hemorrhage) in the simulation laboratory both before and after completion of the curriculum. Evaluators who were blinded to training level scored the simulation performance videotapes using a graded rubric with critical action checklists. Scenario scores were assigned in 5 domains and globally. Paired t-tests were used to determine differences pre- and postcurriculum. Thirty residents completed the curriculum and pre- and postcurriculum testing. Subjects' objective performance scores improved in all 5 domains (P<.05) in all scenarios. When scores were stratified by level of training, all participants demonstrated global improvement. When scores were stratified by previous outpatient simulation experience, subjects with previous experience improved in all but management of excess sedation. Pre- and postcurriculum self-efficacy evaluations demonstrated improvement in all 7 measured areas: confidence, use of appropriate resources, communication skills, complex airway management, bag mask ventilation, resuscitation, and hemorrhage management. Self-efficacy assessment showed improvement in confidence managing outpatient emergencies (P=.001) and ability to communicate well in emergency situations (P<.001). A simulation-based curriculum improved both self-efficacy and objectively rated performance scores in management of outpatient medical emergencies. Simulation-based curricula should be incorporated into residency education. Copyright © 2017 Elsevier Inc. All rights reserved.

  5. Hypergol Maintenance Facility Hazardous Waste South Staging Areas, SWMU 070 Corrective Measures Implementation

    NASA Technical Reports Server (NTRS)

    Miller, Ralinda R.

    2016-01-01

    This document presents the Corrective Measures Implementation (CMI) Year 10 Annual Report for implementation of corrective measures at the Hypergol Maintenance Facility (HMF) Hazardous Waste South Staging Areas at Kennedy Space Center, Florida. The work is being performed by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity (IDIQ) NNK12CA15B, Task Order (TO) 07. Mr. Harry Plaza, P.E., of NASA's Environmental Assurance Branch is the Remediation Project Manager for John F. Kennedy Space Center. The Tetra Tech Program Manager is Mr. Mark Speranza, P.E., and the Tetra Tech Project Manager is Robert Simcik, P.E.

  6. Air Conditioning. Performance Objectives. Intermediate Course.

    ERIC Educational Resources Information Center

    Long, William

    Several intermediate performance objectives and corresponding criterion measures are listed for each of seven terminal objectives for an intermediate air conditioning course. The titles of the seven terminal objectives are Refrigeration Cycle, Job Requirement Skills, Air Conditioning, Trouble Shooting, Performance Test, Shop Management, and S.I.E.…

  7. Managing for Results in America's Great City Schools. A Report of the Performance Measurement and Benchmarking Project

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2008

    2008-01-01

    This report describes statistical indicators developed by the Council of the Great City Schools and its member districts to measure big-city school performance on a range of operational functions in business, finance, human resources and technology. The report also presents data city-by-city on those indicators. This is the second time that…

  8. Portable multi-node LQCD Monte Carlo simulations using OpenACC

    NASA Astrophysics Data System (ADS)

    Bonati, Claudio; Calore, Enrico; D'Elia, Massimo; Mesiti, Michele; Negro, Francesco; Sanfilippo, Francesco; Schifano, Sebastiano Fabio; Silvi, Giorgio; Tripiccione, Raffaele

    This paper describes a state-of-the-art parallel Lattice QCD Monte Carlo code for staggered fermions, purposely designed to be portable across different computer architectures, including GPUs and commodity CPUs. Portability is achieved using the OpenACC parallel programming model, used to develop a code that can be compiled for several processor architectures. The paper focuses on parallelization on multiple computing nodes using OpenACC to manage parallelism within the node, and OpenMPI to manage parallelism among the nodes. We first discuss the available strategies to be adopted to maximize performances, we then describe selected relevant details of the code, and finally measure the level of performance and scaling-performance that we are able to achieve. The work focuses mainly on GPUs, which offer a significantly high level of performances for this application, but also compares with results measured on other processors.

  9. Productivity Measurement: An Analytic Approach

    DTIC Science & Technology

    1983-09-01

    LMDC-TR-83-4 6a. NAME OF PERFORMING ORGANIZATION Leadership and Management Development Center (AU) 6b. OFFICE SYMBOL (If applicable) 7a. NAME...Charles R. White, USAFRES September 1983 Approved for public release; distribution unlimited. \\\\ LEADERSHIP AND MANAGEMENT DEVELOPMENT CENTER, AIR...UNIVERSITY Maxwell Air Force Base, Alabama 36112 0 007 LMDC-TR-83-4 Technical Reports prepared by the Leadership and Management Development

  10. Comparative field permeability measurement of permeable pavements using ASTM C1701 and NCAT permeameter methods.

    PubMed

    Li, Hui; Kayhanian, Masoud; Harvey, John T

    2013-03-30

    Fully permeable pavement is gradually gaining support as an alternative best management practice (BMP) for stormwater runoff management. As the use of these pavements increases, a definitive test method is needed to measure hydraulic performance and to evaluate clogging, both for performance studies and for assessment of permeability for construction quality assurance and maintenance needs assessment. Two of the most commonly used permeability measurement tests for porous asphalt and pervious concrete are the National Center for Asphalt Technology (NCAT) permeameter and ASTM C1701, respectively. This study was undertaken to compare measured values for both methods in the field on a variety of permeable pavements used in current practice. The field measurements were performed using six experimental section designs with different permeable pavement surface types including pervious concrete, porous asphalt and permeable interlocking concrete pavers. Multiple measurements were performed at five locations on each pavement test section. The results showed that: (i) silicone gel is a superior sealing material to prevent water leakage compared with conventional plumbing putty; (ii) both methods (NCAT and ASTM) can effectively be used to measure the permeability of all pavement types and the surface material type will not impact the measurement precision; (iii) the permeability values measured with the ASTM method were 50-90% (75% on average) lower than those measured with the NCAT method; (iv) the larger permeameter cylinder diameter used in the ASTM method improved the reliability and reduced the variability of the measured permeability. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Ability to manage everyday technology after acquired brain injury.

    PubMed

    Kassberg, Ann-Charlotte; Malinowsky, Camilla; Jacobsson, Lars; Lund, Maria Larsson

    2013-01-01

    To investigate and describe how persons with an acquired brain injury (ABI) manage everyday technology (ET) in their daily activities and to explore whether the ability to manage ET was related to the severity of the disability. Eighty-one persons with ABI were observed while managing ET by using the Management of Everyday Technology Assessment (META). The Glasgow Outcome Scale-Extended (GOSE) was used to assess the severity of disability after the ABI. A computer application of a Rasch measurement model was used to generate measures of the participants' ability to manage ET and the measures were compared groupwise with analysis of covariance (ANCOVA). The degree of severity of disability had a significant main effect on the ability to manage ET. The groups with severe and moderate disability exhibited a significantly lower ability to manage ET compared to the group with good recovery. The result indicates that the ability to manage ET in daily activities can be related to the global severity of disability after ABI. This demonstrates the importance of considering the ability to manage ET to support the performance of activities at home, at work and in society in persons with ABI.

  12. Clinical evaluation of pacemaker automatic capture management and atrioventricular interval extension algorithm.

    PubMed

    Chen, Ke-ping; Xu, Geng; Wu, Shulin; Tang, Baopeng; Wang, Li; Zhang, Shu

    2013-03-01

    The present study was to assess the accuracy of automatic atrial and ventricular capture management (ACM and VCM) in determining pacing threshold and the performance of a second-generation automatic atrioventricular (AV) interval extension algorithm for reducing unnecessary ventricular pacing. A total of 398 patients at 32 centres who received an EnPulse dual-chamber pacing/dual-chamber adaptive rate pacing pacemaker (Medtronic, Minneapolis, MN, USA) were enrolled. The last amplitude thresholds as measured by ACM and VCM prior to the 6-month follow-up were compared with manually measured thresholds. Device diagnostics were used to evaluate ACM and VCM and the percentage of ventricular pacing with and without the AV extension algorithm. Modelling was performed to assess longevity gains relating to the use of automaticity features. Atrial and ventricular capture management performed accurately and reliably provided complete capture management in 97% of studied patients. The AV interval extension algorithm reduced the median per cent of right ventricular pacing in patients with sinus node dysfunction from 99.7 to 1.5% at 6-month follow-up and in patients with intermittent AV block (excluding persistent 3° AV block) from 99.9 to 50.2%. On the basis of validated modelling, estimated device longevity could potentially be extended by 1.9 years through the use of the capture management and AV interval extension features. Both ACM and VCM features reliably measured thresholds in nearly all patients; the AV extension algorithm significantly reduced ventricular pacing; and the use of pacemaker automaticity features potentially extends device longevity.

  13. A Global Evaluation of Coral Reef Management Performance: Are MPAs Producing Conservation and Socio-Economic Improvements?

    NASA Astrophysics Data System (ADS)

    Hargreaves-Allen, Venetia; Mourato, Susana; Milner-Gulland, Eleanor Jane

    2011-04-01

    There is a consensus that Marine Protected Area (MPA) performance needs regular evaluation against clear criteria, incorporating counterfactual comparisons of ecological and socio-economic performance. However, these evaluations are scarce at the global level. We compiled self-reports from managers and researchers of 78 coral reef-based MPAs world-wide, on the conservation and welfare improvements that their MPAs provide. We developed a suite of performance measures including fulfilment of design and management criteria, achievement of aims, the cessation of banned or destructive activities, change in threats, and measurable ecological and socio-economic changes in outcomes, which we evaluated with respect to the MPA's age, geographical location and main aims. The sample was found to be broadly representative of MPAs generally, and suggests that many MPAs do not achieve certain fundamental aims including improvements in coral cover over time (in 25% of MPAs), and conflict reduction (in 25%). However, the large majority demonstrated improvements in terms of slowing coral loss, reducing destructive uses and increasing tourism and local employment, despite many being small, underfunded and facing multiple large scale threats beyond the control of managers. However spatial comparisons suggest that in some regions MPAs are simply mirroring outside changes, with demonstrates the importance of testing for additionality. MPA benefits do not appear to increase linearly over time. In combination with other management efforts and regulations, especially those relating to large scale threat reduction and targeted fisheries and conflict resolution instruments, MPAs are an important tool to achieve coral reef conservation globally. Given greater resources and changes which incorporate best available science, such as larger MPAs and no-take areas, networks and reduced user pressure, it is likely that performance could further be enhanced. Performance evaluation should test for the generation of additional ecological and socio-economic improvements over time and compared to unmanaged areas as part of an adaptive management regime.

  14. Measurement error in performance studies of health information technology: lessons from the management literature.

    PubMed

    Litwin, A S; Avgar, A C; Pronovost, P J

    2012-01-01

    Just as researchers and clinicians struggle to pin down the benefits attendant to health information technology (IT), management scholars have long labored to identify the performance effects arising from new technologies and from other organizational innovations, namely the reorganization of work and the devolution of decision-making authority. This paper applies lessons from that literature to theorize the likely sources of measurement error that yield the weak statistical relationship between measures of health IT and various performance outcomes. In so doing, it complements the evaluation literature's more conceptual examination of health IT's limited performance impact. The paper focuses on seven issues, in particular, that likely bias downward the estimated performance effects of health IT. They are 1.) negative self-selection, 2.) omitted or unobserved variables, 3.) mis-measured contextual variables, 4.) mismeasured health IT variables, 5.) lack of attention to the specific stage of the adoption-to-use continuum being examined, 6.) too short of a time horizon, and 7.) inappropriate units-of-analysis. The authors offer ways to counter these challenges. Looking forward more broadly, they suggest that researchers take an organizationally-grounded approach that privileges internal validity over generalizability. This focus on statistical and empirical issues in health IT-performance studies should be complemented by a focus on theoretical issues, in particular, the ways that health IT creates value and apportions it to various stakeholders.

  15. Performance management and goal ambiguity: managerial implications in a single payer system.

    PubMed

    Calciolari, Stefano; Cantù, Elena; Fattore, Giovanni

    2011-01-01

    Goal ambiguity influences the effectiveness of performance management systems to drive organizations toward enhanced results. The literature analyzes the antecedents of goal ambiguity and shows the influence of goal ambiguity on the performance of U.S. federal agencies. However, no study has analyzed goal ambiguity in other countries or in health care systems. This study has three aims: to test the validity of a measurement instrument for goal ambiguity, to investigate its main antecedents, and to explore the relationship between goal ambiguity and organizational performance in a large, public, Beveridge-type health care system. A nationwide survey of general managers of the Italian national health system was performed. A factor analysis was used to validate the mono-dimensionality of an instrument that measured goal ambiguity. Structural equation modeling was used to test both the antecedents and the influence of goal ambiguity on organizational performance. Data from 135 health care organizations (53% response rate) were available for analysis. The results confirm the mono-dimensionality of the instrument, the existence of two environmental sources of ambiguity (political endorsement and governance commitment), and the negative relationship between goal ambiguity and organizational performance. Goal ambiguity matters because it may hamper organizational performance. Therefore, performance should be fostered by reducing goal ambiguity (e.g., goal-setting model, funding arrangements, and political support). Mutatis mutandis, our results may apply to public health care systems of other countries or other "public interest" sectors, such as social care and education.

  16. Sensor Needs for Control and Health Management of Intelligent Aircraft Engines

    NASA Technical Reports Server (NTRS)

    Simon, Donald L.; Gang, Sanjay; Hunter, Gary W.; Guo, Ten-Huei; Semega, Kenneth J.

    2004-01-01

    NASA and the U.S. Department of Defense are conducting programs which support the future vision of "intelligent" aircraft engines for enhancing the affordability, performance, operability, safety, and reliability of aircraft propulsion systems. Intelligent engines will have advanced control and health management capabilities enabling these engines to be self-diagnostic, self-prognostic, and adaptive to optimize performance based upon the current condition of the engine or the current mission of the vehicle. Sensors are a critical technology necessary to enable the intelligent engine vision as they are relied upon to accurately collect the data required for engine control and health management. This paper reviews the anticipated sensor requirements to support the future vision of intelligent engines from a control and health management perspective. Propulsion control and health management technologies are discussed in the broad areas of active component controls, propulsion health management and distributed controls. In each of these three areas individual technologies will be described, input parameters necessary for control feedback or health management will be discussed, and sensor performance specifications for measuring these parameters will be summarized.

  17. Managing Performance to Change Behavior

    ERIC Educational Resources Information Center

    Denisi, Angelo S.

    2011-01-01

    Performance appraisal systems are often considered primarily in their role as criterion measures for validation studies. Even when they are considered in other organizational roles, there has traditionally been a strong focus on improving the accuracy of the appraisals. The present article argues that the proper focus of performance appraisal is…

  18. The five traps of performance measurement.

    PubMed

    Likierman, Andrew

    2009-10-01

    Evaluating a company's performance often entails wading through a thicket of numbers produced by a few simple metrics, writes the author, and senior executives leave measurement to those whose specialty is spreadsheets. To take ownership of performance assessment, those executives should find qualitative, forward-looking measures that will help them avoid five common traps: Measuring against yourself. Find data from outside the company, and reward relative, rather than absolute, performance. Enterprise Rent-A-Car uses a service quality index to measure customers' repeat purchase intentions. Looking backward. Use measures that lead rather than lag the profits in your business. Humana, a health insurer, found that the sickest 10% of its patients account for 80% of its costs; now it offers customers incentives for early screening. Putting your faith in numbers. The soft drinks company Britvic evaluates its executive coaching program not by trying to assign it an ROI number but by tracking participants' careers for a year. Gaming your metrics. The law firm Clifford Chance replaced its single, easy-to-game metric of billable hours with seven criteria on which to base bonuses. Sticking to your numbers too long. Be precise about what you want to assess and explicit about what metrics are assessing it. Such clarity would have helped investors interpret the AAA ratings involved in the financial meltdown. Really good assessment will combine finance managers' relative independence with line managers' expertise.

  19. A systematic approach to sound decision making starts with financial reporting.

    PubMed

    Taylor, R B

    1989-11-01

    Managers and supervisors need information to measure departmental performance. Designing a reporting system requires managers to obtain needed information without being flooded by extraneous data. A reporting framework designed to examine five control points is a necessary tool, and a good place to start.

  20. Assessing BMP Performance Using Microtox Toxicity Analysis

    EPA Science Inventory

    Best Management Practices (BMPs) have been shown to be effective in reducing runoff and pollutants from urban areas and thus provide a mechanism to improve downstream water quality. Currently, BMP performance regarding water quality improvement is assessed through measuring each...

  1. Keeping Score for Organizational Performance.

    ERIC Educational Resources Information Center

    Prewitt, Vana

    2001-01-01

    Discussion of the balanced scorecard (BSC) as a performance management tool focuses on common mistakes and problems with implementing it. Topics include the need for intraorganizational communication and collaboration; strategic thinking; organizational goals; purposes of measurements; individual accountability; and setting priorities. (LRW)

  2. Electric Motor Thermal Management R&D (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennion, K.

    2014-11-01

    Thermal constraints place significant limitations on how electric motors ultimately perform. Without the ability to remove heat, the motor cannot operate without sacrificing performance, efficiency, and reliability. Finite element analysis and computational fluid dynamics modeling approaches are being increasingly utilized in the design and analysis of electric motors. As the models become more sophisticated, it is important to have detailed and accurate knowledge of both the passive thermal performance and the active cooling performance. In this work, we provide an overview of research characterizing both passive and active thermal elements related to electric motor thermal management. To better characterize themore » passive thermal performance, the effective thermal properties and inter-lamination thermal contact resistances were measured for different stator lamination materials. The active cooling performance of automatic transmission fluid (ATF) jets was also measured to better understand the heat transfer coefficients of ATF impinging on motor copper windings. Ford's Mercon LV was the ATF evaluated in this study. The presentation provides an overview of prior work with a focus on describing future plans for research to be performed during FY15.« less

  3. Measuring Information Security Performance with 10 by 10 Model for Holistic State Evaluation

    PubMed Central

    2016-01-01

    Organizations should measure their information security performance if they wish to take the right decisions and develop it in line with their security needs. Since the measurement of information security is generally underdeveloped in practice and many organizations find the existing recommendations too complex, the paper presents a solution in the form of a 10 by 10 information security performance measurement model. The model—ISP 10×10M is composed of ten critical success factors, 100 key performance indicators and 6 performance levels. Its content was devised on the basis of findings presented in the current research studies and standards, while its structure results from an empirical research conducted among information security professionals from Slovenia. Results of the study show that a high level of information security performance is mostly dependent on measures aimed at managing information risks, employees and information sources, while formal and environmental factors have a lesser impact. Experts believe that information security should evolve systematically, where it’s recommended that beginning steps include technical, logical and physical security controls, while advanced activities should relate predominantly strategic management activities. By applying the proposed model, organizations are able to determine the actual level of information security performance based on the weighted indexing technique. In this manner they identify the measures they ought to develop in order to improve the current situation. The ISP 10×10M is a useful tool for conducting internal system evaluations and decision-making. It may also be applied to a larger sample of organizations in order to determine the general state-of-play for research purposes. PMID:27655001

  4. An Analysis of the Impact of Total Quality Management on Employee Performance with mediating role of Process Innovation

    NASA Astrophysics Data System (ADS)

    Nadia Dedy, Aimie; Zakuan, Norhayati; Zaleha Omain, Siti; Rahim, Kamaruzzaman Abdul; Ariff, Mohd Shoki Md; Sulaiman, Zuraidah; Zameri Mat Saman, Muhamad

    2016-05-01

    TQM practices are important to provide customer satisfaction by improved product performance and sustained towards the organizational goal. The objective of this study was to analyse the relationship between TQM practices, process innovation and employee performance. In this study, six critical success factors of TQM have been identified namely customer focus, leadership, training, teamwork, communication, and top management. Based on thorough literature review, employee performances have been measured by two constructs which are job satisfaction and workplace environment. The study used methodology of quantitative approach. The questionnaires for this study were randomly distributed to 102 employees in the selected car manufacturer companies. The respondents were choosing from management team, supervisor, technician and others worker. Results of the study support the proposed hypotheses that there are significant relationship between TQM practices, process innovation and employee performance.

  5. Performance Measurement and Target-Setting in California's Safety Net Health Systems.

    PubMed

    Hemmat, Shirin; Schillinger, Dean; Lyles, Courtney; Ackerman, Sara; Gourley, Gato; Vittinghoff, Eric; Handley, Margaret; Sarkar, Urmimala

    Health policies encourage implementing quality measurement with performance targets. The 2010-2015 California Medicaid waiver mandated quality measurement and reporting. In 2013, California safety net hospitals participating in the waiver set a voluntary performance target (the 90th percentile for Medicare preferred provider organization plans) for mammography screening and cholesterol control in diabetes. They did not reach the target, and the difference-in-differences analysis suggested that there was no difference for mammography ( P = .39) and low-density lipoprotein control ( P = .11) performance compared to measures for which no statewide quality improvement initiative existed. California's Medicaid waiver was associated with improved performance on a number of metrics, but this performance was not attributable to target setting on specific health conditions. Performance may have improved because of secular trends or systems improvements related to waiver funding. Relying on condition-specific targets to measure performance may underestimate improvements and disadvantage certain health systems. Achieving ambitious targets likely requires sustained fiscal, management, and workforce investments.

  6. Barriers and facilitators of evidence-based management of patients with bacterial infections among general dental practitioners: a theory-informed interview study.

    PubMed

    Newlands, Rumana; Duncan, Eilidh M; Prior, Maria; Elouafkaoui, Paula; Elders, Andrew; Young, Linda; Clarkson, Jan E; Ramsay, Craig R

    2016-01-29

    General dental practitioners (GDPs) regularly prescribe antibiotics to manage dental infections although most infections can be treated successfully by local measures. Published guidance to support GDPs to make appropriate prescribing decisions exists but there continues to be wide variation in dental antibiotic prescribing. An interview study was conducted as part of the Reducing Antibiotic Prescribing in Dentistry (RAPiD) trial to understand the barriers and facilitators of using local measures instead of prescribing antibiotics to manage bacterial infections. Thirty semi-structured one-to-one telephone interviews were conducted using the Theoretical Domains Framework (TDF). Responses were coded into domains of the TDF and sub-themes. Priority domains (high frequency: ≥50 % interviewees discussed) relevant to behaviour change were identified as targets for future intervention efforts and mapped onto 'intervention functions' of the Behaviour Change Wheel system. Five domains (behavioural regulation, social influences, reinforcement, environmental context and resources, and beliefs about consequences) with seven sub-themes were identified as targets for future intervention. All participants had knowledge about the evidence-based management of bacterial infections, but they reported difficulties in following this due to patient factors and time management. Lack of time was found to significantly influence their decision processes with regard to performing local measures. Beliefs about their capabilities to overcome patient influence, beliefs that performing local measures would impact on subsequent appointment times as well as there being no incentives for performing local measures were also featured. Though no knowledge or basic skills issues were identified, the participants suggested some continuous professional development programmes (e.g. time management, an overview of published guidance) to address some of the barriers. The domain results suggest a number of intervention functions through which future interventions could change GDPs' antibiotic prescribing for bacterial infections: imparting skills through training, providing an example for GDPs to imitate (i.e. modelling) or creating the expectation of a reward (i.e. incentivisation). This is the first theoretically informed study to identify barriers and facilitators of evidence-based management of patients with bacterial infections among GDPs. A pragmatic approach is needed to address the modifiable barriers in future interventions intended to change dentists' inappropriate prescribing behaviour.

  7. Management Strategy Evaluation Applied to Coral Reef Ecosystems in Support of Ecosystem-Based Management.

    PubMed

    Weijerman, Mariska; Fulton, Elizabeth A; Brainard, Russell E

    2016-01-01

    Ecosystem modelling is increasingly used to explore ecosystem-level effects of changing environmental conditions and management actions. For coral reefs there has been increasing interest in recent decades in the use of ecosystem models for evaluating the effects of fishing and the efficacy of marine protected areas. However, ecosystem models that integrate physical forcings, biogeochemical and ecological dynamics, and human induced perturbations are still underdeveloped. We applied an ecosystem model (Atlantis) to the coral reef ecosystem of Guam using a suite of management scenarios prioritized in consultation with local resource managers to review the effects of each scenario on performance measures related to the ecosystem, the reef-fish fishery (e.g., fish landings) and coral habitat. Comparing tradeoffs across the selected scenarios showed that each scenario performed best for at least one of the selected performance indicators. The integrated 'full regulation' scenario outperformed other scenarios with four out of the six performance metrics at the cost of reef-fish landings. This model application quantifies the socio-ecological costs and benefits of alternative management scenarios. When the effects of climate change were taken into account, several scenarios performed equally well, but none prevented a collapse in coral biomass over the next few decades assuming a business-as-usual greenhouse gas emissions scenario.

  8. Management Strategy Evaluation Applied to Coral Reef Ecosystems in Support of Ecosystem-Based Management

    PubMed Central

    Weijerman, Mariska; Fulton, Elizabeth A.; Brainard, Russell E.

    2016-01-01

    Ecosystem modelling is increasingly used to explore ecosystem-level effects of changing environmental conditions and management actions. For coral reefs there has been increasing interest in recent decades in the use of ecosystem models for evaluating the effects of fishing and the efficacy of marine protected areas. However, ecosystem models that integrate physical forcings, biogeochemical and ecological dynamics, and human induced perturbations are still underdeveloped. We applied an ecosystem model (Atlantis) to the coral reef ecosystem of Guam using a suite of management scenarios prioritized in consultation with local resource managers to review the effects of each scenario on performance measures related to the ecosystem, the reef-fish fishery (e.g., fish landings) and coral habitat. Comparing tradeoffs across the selected scenarios showed that each scenario performed best for at least one of the selected performance indicators. The integrated ‘full regulation’ scenario outperformed other scenarios with four out of the six performance metrics at the cost of reef-fish landings. This model application quantifies the socio-ecological costs and benefits of alternative management scenarios. When the effects of climate change were taken into account, several scenarios performed equally well, but none prevented a collapse in coral biomass over the next few decades assuming a business-as-usual greenhouse gas emissions scenario. PMID:27023183

  9. Modeling and dynamic monitoring of ecosystem performance in the Yukon River Basin

    USGS Publications Warehouse

    Wylie, Bruce K.; Zhang, L.; Ji, Lei; Tieszen, Larry L.; Bliss, N.B.

    2008-01-01

    Central Alaska is ecologically sensitive and experiencing stress in response to marked regional warming. Resource managers would benefit from an improved ability to monitor ecosystem processes in response to climate change, fire, insect damage, and management policies and to predict responses to future climate scenarios. We have developed a method for analyzing ecosystem performance as represented by the growing season integral of normalized difference vegetation index (NDVI), which is a measure of greenness that can be interpreted in terms of plant growth or photosynthetic activity (gross primary productivity). The approach illustrates the status and trends of ecosystem changes and separates the influences of climate and local site conditions from the influences of disturbances and land management.We emphasize the ability to quantify ecosystem processes, not simply changes in land cover, across the entire period of the remote sensing archive (Wylie and others, 2008). The method builds upon remotely sensed measures of vegetation greenness for each growing season. By itself, however, a time series of greenness often reflects annual climate variations in temperature and precipitation. Our method seeks to remove the influence of climate so that changes in underlying ecological conditions are identified and quantified. We define an "expected ecosystem performance" to represent the greenness response expected in a particular year given the climate of that year. We distinguish "performance anomalies" as cases where the ecosystem response is significantly different from the expected ecosystem performance. Maps of the performance anomalies (fig. 1) and trends in the anomalies give valuable information on the ecosystems for land managers and policy makers at a resolution of 1 km to 250 m.

  10. Reverse quality management: developing evidence-based best practices in health emergency management.

    PubMed

    Lynch, Tim; Cox, Paul

    2006-01-01

    The British Columbia Ministry of Health's Framework for Core Functions in Public Health was the catalyst that inspired this review of best practices in health emergency management. The fieldwork was conducted in the fall of 2005 between hurricane Katrina and the South Asia earthquake. These tragedies, shown on 24/7 television news channels, provided an eyewitness account of disaster management, or lack of it, in our global village world. It is not enough to just have best practices in place. There has to be a governance structure that can be held accountable. This review of best practices lists actions in support of an emergency preparedness culture at the management, executive, and corporate/governance levels of the organization. The methodology adopted a future quality management approach of the emergency management process to identify the corresponding performance indictors that correlated with practices or sets of practices. Identifying best practice performance indictors needed to conduct a future quality management audit is described as reverse quality management. Best practices cannot be assessed as stand-alone criteria; they are influenced by organizational culture. The defining of best practices was influenced by doubt about defining a practice it is hoped will never be performed, medical staff involvement, leadership, and an appreciation of the resources required and how they need to be managed. Best practice benchmarks are seen as being related more to "measures" of performance defined locally and agreed on by 2 or more parties rather than to achieving industrial standards. Relating practices to performance indicators and then to benchmarks resulted in the development of a Health Emergency Management Best Practices Matrix that lists specific practice in the different phases of emergency management.

  11. Measuring the performance of Internet companies using a two-stage data envelopment analysis model

    NASA Astrophysics Data System (ADS)

    Cao, Xiongfei; Yang, Feng

    2011-05-01

    In exploring the business operation of Internet companies, few researchers have used data envelopment analysis (DEA) to evaluate their performance. Since the Internet companies have a two-stage production process: marketability and profitability, this study employs a relational two-stage DEA model to assess the efficiency of the 40 dot com firms. The results show that our model performs better in measuring efficiency, and is able to discriminate the causes of inefficiency, thus helping business management to be more effective through providing more guidance to business performance improvement.

  12. Relationship between quality improvement processes and clinical performance.

    PubMed

    Damberg, Cheryl L; Shortell, Stephen M; Raube, Kristiana; Gillies, Robin R; Rittenhouse, Diane; McCurdy, Rodney K; Casalino, Lawrence P; Adams, John

    2010-08-01

    To examine the association between performance on clinical process measures and intermediate outcomes and the use of chronic care management processes (CMPs), electronic medical record (EMR) capabilities, and participation in external quality improvement (QI) initiatives. Cross-sectional analysis of linked 2006 clinical performance scores from the Integrated Healthcare Association's pay-for-performance program and survey data from the 2nd National Study of Physician Organizations among 108 California physician organizations (POs). Controlling for differences in PO size, organization type (medical group or independent practice association), and Medicaid revenue, we used ordinary least squares regression analysis to examine the association between the use of CMPs, EMR capabilities, and external QI initiatives and performance on the following 3 clinical composite measures: diabetes management, processes of care, and intermediate outcomes (diabetes and cardiovascular). Greater use of CMPs was significantly associated with clinical performance: among POs using more than 5 CMPs, we observed a 3.2-point higher diabetes management score on a performance scale with scores ranging from 0 to 100 (P <.001), while for each 1.0-point increase on the CMP index, we observed a 1.0-point gain in intermediate outcomes (P <.001). Participation in external QI initiatives was positively associated with improved delivery of clinical processes of care: a 1.0-point increase on the QI index translated into a 1.4-point gain in processes-of-care performance (P = .02). No relationship was observed between EMR capabilities and performance. Greater investments in CMPs and QI interventions may help POs raise clinical performance and achieve success under performance-based accountability schemes.

  13. Managing for Results in America's Great City Schools. A Report of the Performance Measurement and Benchmarking Project, Spring 2008

    ERIC Educational Resources Information Center

    Council of the Great City Schools, 2008

    2008-01-01

    This report describes statistical indicators developed by the Council of the Great City Schools and its member districts to measure big-city school performance on a range of operational functions in business, finance, human resources and technology. The report also presents data city-by-city on those indicators. This is the second time that…

  14. What difference does ("good") HRM make?

    PubMed

    Buchan, James

    2004-06-07

    The importance of human resources management (HRM) to the success or failure of health system performance has, until recently, been generally overlooked. In recent years it has been increasingly recognised that getting HR policy and management "right" has to be at the core of any sustainable solution to health system performance. In comparison to the evidence base on health care reform-related issues of health system finance and appropriate purchaser/provider incentive structures, there is very limited information on the HRM dimension or its impact.Despite the limited, but growing, evidence base on the impact of HRM on organisational performance in other sectors, there have been relatively few attempts to assess the implications of this evidence for the health sector. This paper examines this broader evidence base on HRM in other sectors and examines some of the underlying issues related to "good" HRM in the health sector.The paper considers how human resource management (HRM) has been defined and evaluated in other sectors. Essentially there are two sub-themes: how have HRM interventions been defined? and how have the effects of these interventions been measured in order to identify which interventions are most effective? In other words, what is "good" HRM?The paper argues that it is not only the organisational context that differentiates the health sector from many other sectors, in terms of HRM. Many of the measures of organisational performance are also unique. "Performance" in the health sector can be fully assessed only by means of indicators that are sector-specific. These can focus on measures of clinical activity or workload (e.g. staff per occupied bed, or patient acuity measures), on measures of output (e.g. number of patients treated) or, less frequently, on measures of outcome (e.g. mortality rates or rate of post-surgery complications).The paper also stresses the need for a "fit" between the HRM approach and the organisational characteristics, context and priorities, and for recognition that so-called "bundles" of linked and coordinated HRM interventions will be more likely to achieve sustained improvements in organisational performance than single or uncoordinated interventions.

  15. 75 FR 40763 - Federal Management Regulation; Sale of Personal Property

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... Sec. Sec. 102- 38.365 and 102-38.370 must report quarterly sales performance measures to the GSA...; Sequence 1] RIN 3090-AJ04 Federal Management Regulation; Sale of Personal Property AGENCY: Office of... the sale of personal property through Federal Asset Sales (FAS) Sales Centers. DATES: Interested...

  16. TQ What?: Applying Total Quality Management to Child Care.

    ERIC Educational Resources Information Center

    Hewes, Dorothy

    1994-01-01

    Discusses the concept of Total Quality Management (TQM), developed by W. Edward Deming and Joseph Juran in 1940s, and its applications for child care centers. Discusses how TQM focuses on customer satisfaction, measuring performance, benchmarking, employee empowerment, and continuous training. Includes a list of suggested readings on TQM. (MDM)

  17. Crash energy management : one- and two-car passenger rail impact tests - summary of structural and occupant test results

    DOT National Transportation Integrated Search

    2016-12-01

    Two full-scale impact tests were conducted to measure the crashworthiness performance of Crash Energy Management (CEM) equipped passenger rail cars. On December 3, 2003, a single car impacted a fixed barrier at approximately 35 mph and on February 26...

  18. Performance Measurement: Does Education Impact Productivity?

    ERIC Educational Resources Information Center

    Larbi-Apau, Josephine A.; Sarpong, Daniel Bruce

    2010-01-01

    This study investigated the impact of managers' educational levels on productivity in the commercial poultry industry in Ghana. The level of education of 33 production managers of the poultry farms were factored into a Cobb-Douglas production function with other explanatory variables. The computed percentage change in productivity due to higher…

  19. 24 CFR 902.1 - Purpose, scope, and general matters.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... agencies (PHAs), public housing residents, and the general public, by providing a management tool for... requirements for poor performers. (b) Scope. PHAS is a strategic measure of the essential housing operations of... indicators, which are more fully addressed in § 902.9: Physical condition, financial condition, management...

  20. Lost Hills Field Trial - incorporating new technology for resevoir management

    NASA Technical Reports Server (NTRS)

    Fielding, E. J.; Brink, J. L.; Patzek, T. W.; Silin, D. B.

    2002-01-01

    This paper will discuss how Chevron U.S.A. Production Company is implementing a field trial that will use Supervisory Control and Data Acquisition (SCADA)on injection wells, in conjunction with satellite images to measure ground elevation changes, to perform real-time resevoir management in the Lost Hills Field.

  1. Assessing BMP Performance Using Microtox Toxicity Analysis - Rhode Island

    EPA Science Inventory

    Best Management Practices (BMPs) have been shown to be effective in reducing runoff and pollutants from urban areas and thus provide a mechanism to improve downstream water quality. Currently, BMP performance regarding water quality improvement is assessed through measuring each...

  2. Assessing BMP Performance Using Microtox® Toxicity Analysis

    EPA Science Inventory

    Best Management Practices (BMPs) have been shown to be effective in reducing runoff and pollutants from urban areas and thus provide a mechanism to improve downstream water quality. Currently, BMP performance regarding water quality improvement is assessed through measuring each...

  3. Quality improvement in childhood obesity management through the maintenance of certification process.

    PubMed

    Huang, Jeannie S; Chun, Stanford; Sandhu, Amanpreet; Terrones, Laura

    2013-11-01

    To assess the Health and Obesity: Prevention and Education (HOPE) Curriculum Project, a web-based clinician education program that promotes appropriate screening, prevention, and management of weight among youth by pediatric practitioners, based on the 2007 Expert Committee recommendations. The project currently provides Maintenance of Certification (MOC) Part 4 credit through the American Board of Pediatrics. Participants identified themselves to the HOPE MOC Part 4 program. Enrollees were required to complete all continuing medical education modules (10.5 hours). Knowledge acquisition and self-reported confidence levels related to screening, prevention, and management practices of pediatric obesity were measured using preknowledge and postknowledge questionnaires. Participants were also required to perform a quality improvement project and submit practice performance data from repeated medical chart reviews over time. Knowledge acquisition, self-efficacy, and practice performance data were analyzed using repeated-measures analyses. The 51 participants demonstrated significant improvements in knowledge acquisition and self-efficacy scores after viewing individual modules. In addition, participants demonstrated significant improvements in measured clinical compliance with recommended practices over time. Participation in the HOPE MOC Part 4 program appeared to improve knowledge acquisition, self-efficacy, and physician compliance with recommended practice recommendations for the screening, prevention, and management of pediatric obesity. Further data are required to determine whether such practice-based improvements translate into actual reduction in patient weight and/or reduction in health-related costs related to overweight and obesity in youth. Copyright © 2013 Mosby, Inc. All rights reserved.

  4. Evaluating the fair market value of pay for performance.

    PubMed

    Johnson, Jen; Higgins, Alexandra

    2014-04-01

    When assessing a pay-for-performance arrangement, the following factors should be considered: Existence and/or size of minimum savings threshold before savings are allocated. Savings allocation percentage available to physicians. Benchmarks used to measure quality against past performance and/or medical evidence. Ways in which quality outcomes are measured and paid for. Per member per month payments for patient management. Physician investment (participation fee, time, or capital). Existence of downside risk to physicians. Employed compensation structure (if applicable).

  5. The impact of health plan delivery system organization on clinical quality and patient satisfaction.

    PubMed

    Gillies, Robin R; Chenok, Kate Eresian; Shortell, Stephen M; Pawlson, Gregory; Wimbush, Julian J

    2006-08-01

    The purpose of this study was to examine the extent to which measures of health plan clinical performance and measures of patient perceptions of care are associated with health plan organizational characteristics, including the percentage of care provided based on a group or staff model delivery system, for-profit (tax) status, and affiliation with a national managed care firm. Data describing health plans on region, age of health plan, for-profit status, affiliation with a national managed care firm, percentage of Medicare business, total enrollment, ratio of primary care physicians to specialists, HMO penetration, and form of health care delivery system (e.g., IPA, network, mixed, staff, group) were obtained from InterStudy. Clinical performance measures for women's health screening rates, child and adolescent immunization rates, heart disease screening rates, diabetes screening rates, and smoking cessation were developed from HEDIS data. Measures of patient perceptions of care are obtained from CAHPS survey data submitted as Healthplan Employer Data and Information Set, Consumer Assessment of Health Plans 2.0 H. Multivariate regression cross-sectional analysis of 272 health plans was used to evaluate the relationship of health plan characteristics with measures of clinical performance and patient perceptions of care. The form of delivery system, measured by percent of care delivered by staff and group model systems, is significantly related (p < or = .05) with four of the five clinical performance indices but none of the three satisfaction performance indices. Other variables significantly associated with performance were being geographically located in the Northeast, having nonprofit status, and for patient satisfaction, not being part of a larger insurance company. These comparative results provide evidence suggesting that the type of delivery system used by health plans is related to many clinical performance measures but is not related to patient perceptions of care. These findings underscore the importance of the form of the delivery system and the need for further inquiry that examines the relationship between organizational form and performance.

  6. The balanced scorecard: an incremental approach model to health care management.

    PubMed

    Pineno, Charles J

    2002-01-01

    The balanced scorecard represents a technique used in strategic management to translate an organization's mission and strategy into a comprehensive set of performance measures that provide the framework for implementation of strategic management. This article develops an incremental approach for decision making by formulating a specific balanced scorecard model with an index of nonfinancial as well as financial measures. The incremental approach to costs, including profit contribution analysis and probabilities, allows decisionmakers to assess, for example, how their desire to meet different health care needs will cause changes in service design. This incremental approach to the balanced scorecard may prove to be useful in evaluating the existence of causality relationships between different objective and subjective measures to be included within the balanced scorecard.

  7. The Proposal of Key Performance Indicators in Facility Management and Determination the Weights of Significance

    NASA Astrophysics Data System (ADS)

    Rimbalová, Jarmila; Vilčeková, Silvia

    2013-11-01

    The practice of facilities management is rapidly evolving with the increasing interest in the discourse of sustainable development. The industry and its market are forecasted to develop to include non-core functions, activities traditionally not associated with this profession, but which are increasingly being addressed by facilities managers. The scale of growth in the built environment and the consequential growth of the facility management sector is anticipated to be enormous. Key Performance Indicators (KPI) are measure that provides essential information about performance of facility services delivery. In selecting KPI, it is critical to limit them to those factors that are essential to the organization reaching its goals. It is also important to keep the number of KPI small just to keep everyone's attention focused on achieving the same KPIs. This paper deals with the determination of weights of KPI of FM in terms of the design and use of sustainable buildings.

  8. A Hierarchical structure of key performance indicators for operation management and continuous improvement in production systems

    PubMed Central

    Kang, Ningxuan; Zhao, Cong; Li, Jingshan; Horst, John A.

    2018-01-01

    Key performance indicators (KPIs) are critical for manufacturing operation management and continuous improvement (CI). In modern manufacturing systems, KPIs are defined as a set of metrics to reflect operation performance, such as efficiency, throughput, availability, from productivity, quality and maintenance perspectives. Through continuous monitoring and measurement of KPIs, meaningful quantification and identification of different aspects of operation activities can be obtained, which enable and direct CI efforts. A set of 34 KPIs has been introduced in ISO 22400. However, the KPIs in a manufacturing system are not independent, and they may have intrinsic mutual relationships. The goal of this paper is to introduce a multi-level structure for identification and analysis of KPIs and their intrinsic relationships in production systems. Specifically, through such a hierarchical structure, we define and layer KPIs into levels of basic KPIs, comprehensive KPIs and their supporting metrics, and use it to investigate the relationships and dependencies between KPIs. Such a study can provide a useful tool for manufacturing engineers and managers to measure and utilize KPIs for CI. PMID:29398722

  9. A Hierarchical structure of key performance indicators for operation management and continuous improvement in production systems.

    PubMed

    Kang, Ningxuan; Zhao, Cong; Li, Jingshan; Horst, John A

    2016-01-01

    Key performance indicators (KPIs) are critical for manufacturing operation management and continuous improvement (CI). In modern manufacturing systems, KPIs are defined as a set of metrics to reflect operation performance, such as efficiency, throughput, availability, from productivity, quality and maintenance perspectives. Through continuous monitoring and measurement of KPIs, meaningful quantification and identification of different aspects of operation activities can be obtained, which enable and direct CI efforts. A set of 34 KPIs has been introduced in ISO 22400. However, the KPIs in a manufacturing system are not independent, and they may have intrinsic mutual relationships. The goal of this paper is to introduce a multi-level structure for identification and analysis of KPIs and their intrinsic relationships in production systems. Specifically, through such a hierarchical structure, we define and layer KPIs into levels of basic KPIs, comprehensive KPIs and their supporting metrics, and use it to investigate the relationships and dependencies between KPIs. Such a study can provide a useful tool for manufacturing engineers and managers to measure and utilize KPIs for CI.

  10. Does teaching crisis resource management skills improve resuscitation performance in pediatric residents?*.

    PubMed

    Blackwood, Jaime; Duff, Jonathan P; Nettel-Aguirre, Alberto; Djogovic, Dennis; Joynt, Chloe

    2014-05-01

    The effect of teaching crisis resource management skills on the resuscitation performance of pediatric residents is unknown. The primary objective of this pilot study was to determine if teaching crisis resource management to residents leads to improved clinical and crisis resource management performance in simulated pediatric resuscitation scenarios. A prospective, randomized control pilot study. Simulation facility at tertiary pediatric hospital. Junior pediatric residents. Junior pediatric residents were randomized to 1 hour of crisis resource management instruction or no additional training. Time to predetermined resuscitation tasks was noted in simulated resuscitation scenarios immediately after intervention and again 3 months post intervention. Crisis resource management skills were evaluated using the Ottawa Global Rating Scale. Fifteen junior residents participated in the study, of which seven in the intervention group. The intervention crisis resource management group placed monitor leads 24.6 seconds earlier (p = 0.02), placed an IV 47.1 seconds sooner (p = 0.04), called for help 50.4 seconds faster (p = 0.03), and checked for a pulse after noticing a rhythm change 84.9 seconds quicker (p = 0.01). There was no statistically significant difference in time to initiation of cardiopulmonary resuscitation (p = 0.264). The intervention group had overall crisis resource management performance scores 1.15 points higher (Ottawa Global Rating Scale [out of 7]) (p = 0.02). Three months later, these differences between the groups persisted. A 1-hour crisis resource management teaching session improved time to critical initial steps of pediatric resuscitation and crisis resource management performance as measured by the Ottawa Global Rating Scale. The control group did not develop these crisis resource management skills over 3 months of standard training indicating that obtaining these skills requires specific education. Larger studies of crisis resource education are required.

  11. Transient probabilities for queues with applications to hospital waiting list management.

    PubMed

    Joy, Mark; Jones, Simon

    2005-08-01

    In this paper we study queuing systems within the NHS. Recently imposed government performance targets lead NHS executives to investigate and instigate alternative management strategies, thereby imposing structural changes on the queues. Under such circumstances, it is most unlikely that such systems are in equilibrium. It is crucial, in our opinion, to recognise this state of affairs in order to make a balanced assessment of the role of queue management in the modern NHS. From a mathematical perspective it should be emphasised that measures of the state of a queue based upon the assumption of statistical equilibrium (a pervasive methodology in the study of queues) are simply wrong in the above scenario. To base strategic decisions around such ideas is therefore highly questionable and it is one of the purposes of this paper to offer alternatives: we present some (recent) research whose results generate performance measures and measures of risk, for example, of waiting-times growing unacceptably large; we emphasise that these results concern the transient behaviour of the queueing model-there is no asssumption of statistical equilibrium. We also demonstrate that our results are computationally tractable.

  12. 78 FR 79697 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... new initiatives based on emerging issues, science, and policy; (6) supports the harmonization and..., and programmatic efforts; (10) manages evaluation fellowship; (11) guides performance-based strategic... improvement based on effective program evaluation, and performance measurement; (14) supports evidence-driven...

  13. A Tutorial on Probablilistic Risk Assessement and its Role in Risk-Informed Decision Making

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon

    2010-01-01

    This slide presentation reviews risk assessment and its role in risk-informed decision making. It includes information on probabilistic risk assessment, typical risk management process, origins of risk matrix, performance measures, performance objectives and Bayes theorem.

  14. Development of a standardized job description for healthcare managers of metabolic syndrome management programs in Korean community health centers.

    PubMed

    Lee, Youngjin; Choo, Jina; Cho, Jeonghyun; Kim, So-Nam; Lee, Hye-Eun; Yoon, Seok-Jun; Seomun, GyeongAe

    2014-03-01

    This study aimed to develop a job description for healthcare managers of metabolic syndrome management programs using task analysis. Exploratory research was performed by using the Developing a Curriculum method, the Intervention Wheel model, and focus group discussions. Subsequently, we conducted a survey of 215 healthcare workers from 25 community health centers to verify that the job description we created was accurate. We defined the role of healthcare managers. Next, we elucidated the tasks of healthcare managers and performed needs analysis to examine the frequency, importance, and difficulty of each of their duties. Finally, we verified that our job description was accurate. Based on the 8 duties, 30 tasks, and 44 task elements assigned to healthcare managers, we found that the healthcare managers functioned both as team coordinators responsible for providing multidisciplinary health services and nurse specialists providing health promotion services. In terms of importance and difficulty of tasks performed by the healthcare managers, which were measured using a determinant coefficient, the highest-ranked task was planning social marketing (15.4), while the lowest-ranked task was managing human resources (9.9). A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs. Copyright © 2014. Published by Elsevier B.V.

  15. Rule Driven Multi-Objective Management (RDMOM) - An Alternative Form for Describing and Developing Effective Water Resources Management Strategies

    NASA Astrophysics Data System (ADS)

    Sheer, D. P.

    2011-12-01

    Economics provides a model for describing human behavior applied to the management of water resources, but that model assumes, among other things, that managers have a way of directly relating immediate actions to long-term economic outcomes. This is rarely the case in water resources problems where uncertainty has significant impacts on the effectiveness of management strategies and where the management objectives are very difficult to commensurate. The difficulty in using economics is even greater in multiparty disputes, where each party has a different relative value for each of the management objectives, and many of the management objectives are shared. A three step approach to collaborative decision making can overcome these difficulties. The first step involves creating science based performance measures and evaluation tools to estimate the effect of alternative management strategies on each of the non-commensurate objectives. The second step involves developing short-term surrogate operating objectives that implicitly deal with all of the aspects of the long term uncertainty. Management that continually "optimizes" the short-term objectives subject to physical and other constraints that change through time can be characterized as Rule Driven Multi-Objective Management (RDMOM). RDMOM strategies are then tested in simulation models to provide the basis for evaluating performance measures. Participants in the collaborative process then engage in multiparty discussions that create new alternatives, and "barter" a deal. RDMOM does not assume that managers fully understand the link between current actions and long term goals. Rather, it assumes that managers operate to achieve short-term surrogate objectives which they believe will achieve an appropriate balance of both short and long-term incommensurable benefits. A reservoir rule curve is a simple, but often not particularly effective, example of the real-world implementation of RDMOM. Water managers find they can easily describe and explain their written and unwritten protocols using the RDMOM, and that the use of short-term surrogates is both intellectually appealing and pragmatic. The identification of operating targets as short-term surrogates leads naturally to a critical discussion of long-term objectives, and to the development of performance measures for the long-term objectives. The transparency and practical feasibility RDMOM based strategies is often crucial to the success of collaborative efforts. Complex disputes in the Delaware and Susquehanna Basins, the Everglades and Lower East Coast South Florida, Southern Nevada, Washington DC and many others have been resolved using RDMOM strategies.

  16. Development of an Integrated Performance Measurement (PM) Model for Pharmaceutical Industry

    PubMed Central

    Shabaninejad, Hosein; Mirsalehian, Mohammad Hossein; Mehralian, Gholamhossein

    2014-01-01

    With respect to special characteristics of pharmaceutical industry and lack of reported performance measure, this study tries to design an integrated PM model for pharmaceutical companies. For generating this model; we first identified the key performance indicators (KPIs) and the key result indicators (KRIs) of a typical pharmaceutical company. Then, based on experts᾽ opinions, the identified indicators were ranked with respect to their importance, and the most important of them were selected to be used in the proposed model; In this model, we identified 25 KPIs and 12 KRIs. Although, this model is mostly appropriate to measure the performances of pharmaceutical companies, it can be also used to measure the performances of other industries with some modifications. We strongly recommend pharmaceutical managers to link these indicators with their payment and reward system, which can dramatically affect the performance of employees, and consequently their organization`s success. PMID:24711848

  17. A Correlation Between Quality Management Metrics and Technical Performance Measurement

    DTIC Science & Technology

    2007-03-01

    Engineering Working Group SME Subject Matter Expert SoS System of Systems SPI Schedule performance Index SSEI System of Systems Engineering and...and stated as such [Q, M , M &G]. The QMM equation is given by: 12 QMM=0.92RQM+0.67EPM+0.55RKM+1.86PM, where: RGM is the requirements management...schedule. Now if corrective action is not taken, the project/task will be completed behind schedule and over budget. m . As well as the derived

  18. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  19. Performance appraisal & promotion process: A measured approach

    NASA Astrophysics Data System (ADS)

    Kumar, Jitendra

    2012-06-01

    Most of the companies have yearly performance appraisal process for their employees. This process involves rating of employees by their manager. And Companies rely purely on managerís state of thinking and perception. Humans have tendency to become biased, corrupt, give favor to some employees whom they like. This favor is due to some other reasons e.g. personal reason, social reason, political reason, flattering. All these reasons are not related to the work that the employee is doing for the organization.

  20. The coronary artery disease quality dashboard: a chronic care disease management tool in an electronic health record.

    PubMed

    Jung, Eunice; Schnipper, Jeffrey L; Li, Qi; Linder, Jeffrey A; Rose, Alan F; Li, Ruzhuo; Eskin, Michael S; Housman, Dan; Middleton, Blackford; Einbinder, Jonathan S

    2007-10-11

    Quality reporting tools, integrated with ambulatory electronic health records (EHRs), may help clinicians understand performance, manage populations, and improve quality. The Coronary Artery Disease Quality Dash board (CAD QD) is a secure web report for performance measurement of a chronic care condition delivered through a central data warehouse and custom-built reporting tool. Pilot evaluation of the CAD Quality Dash board indicates that clinicians prefer a quality report that combines not only structured data from EHRs but one that facilitates actions to be taken on individual patients or on a population, i.e., for case management.

  1. Redundancy management of electrohydraulic servoactuators by mathematical model referencing

    NASA Technical Reports Server (NTRS)

    Campbell, R. A.

    1971-01-01

    A description of a mathematical model reference system is presented which provides redundancy management for an electrohydraulic servoactuator. The mathematical model includes a compensation network that calculates reference parameter perturbations induced by external disturbance forces. This is accomplished by using the measured pressure differential data taken from the physical system. This technique was experimentally verified by tests performed using the H-1 engine thrust vector control system for Saturn IB. The results of these tests are included in this report. It was concluded that this technique improves the tracking accuracy of the model reference system to the extent that redundancy management of electrohydraulic servosystems may be performed using this method.

  2. A Framework for Managing Resources To Advance Mission.

    ERIC Educational Resources Information Center

    Salluzzo, Ronald E.; Prager, Frederic J.

    1999-01-01

    The principles of ratio analysis can help measure use of financial resources to achieve college mission by quantifying status, sources, and use of resources and the institution's relative ability to repay current and future debt. Business officers and boards can use these measures to measure institutional performance; ratios can also help focus…

  3. If brands are built over years, why are they managed over quarters?

    PubMed

    Lodish, Leonard M; Mela, Carl F

    2007-01-01

    Brands are on the wane. Many consumer-goods companies blame the big-box discount retailers, but the Wharton School's Leonard Lodish and the Fuqua School's Carl Mela have a different explanation. Their research suggests that companies have damaged their brands by investing too much in short-term price promotions and too little in long-term brand building. To rescue their brands and increase profitability, corporate managers must arm themselves with long-term measures of brand performance and use them to make smarter marketing decisions. Several factors explain the short-sightedness of brand management: the increased availability of weekly, or even hourly, scanner data, which show a clear link between discounts and immediate boosts in sales; the relative difficulty of measuring the effects of advertising, new-product development, and distribution--all of which can contribute to a brand's long-term health; the short tenure of most brand managers; and the near-term orientation of Wall Street analysts. Although discounts do increase sales in the short-term, they ultimately lower profit margins. If a product is often discounted, consumers learn to buy it only when it's on sale. Moreover, when one firm increases its discounts, others usually follow suit, lowering everyone's margins. Executives can monitor a brand's long-term performance by watching a dashboard of measures. Only after examining such measures, for example, did managers at Clorox discover that the company's heavy discounting and decreased advertising had caused a steady decline in overall bleach sales and profit margins. In response, Clorox reduced discounting and increased television advertising, moves that ultimately strengthened the brand and reversed the firm's downward trends.

  4. Using Performance Measures to Allocate Consumable Funding

    DTIC Science & Technology

    2007-06-01

    The Air Force is now using the Customer Oriented Leveling Technique (COLT) to determine levels for consumable items at its bases. COLT is an...Overview • COLT is a system to set AF retail stock levels for DLA-managed consumable parts to minimize expected customer wait time (ECWT) • COLT...changed please list both.) Original title on 712 A/B: Using Performance Measures to Allocate Consumable Funding If the title was revised

  5. 7 CFR 600.3 - Regional offices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementation, consistency, and accountability; (3) Region-wide strategic planning, performance measurement, and operations management; (4) Administrative operations and support; (5) Fund integrity and accountability; (6...

  6. Care management for Type 2 diabetes in the United States: a systematic review and meta-analysis.

    PubMed

    Egginton, Jason S; Ridgeway, Jennifer L; Shah, Nilay D; Balasubramaniam, Saranya; Emmanuel, Joann R; Prokop, Larry J; Montori, Victor M; Murad, Mohammad Hassan

    2012-03-22

    This systematic review and meta-analysis aims at assessing the composition and performance of care management models evaluated in the last decade and their impact on patient important outcomes. A comprehensive literature search of electronic bibliographic databases was performed to identify care management trials in type 2 diabetes. Random effects meta-analysis was used when feasible to pool outcome measures. Fifty-two studies were eligible. Most commonly reported were surrogate outcomes (such as HbA1c and LDL), followed by process measures (clinic visit or testing frequency). Less frequently reported were quality of life, patient satisfaction, self-care, and healthcare utilization. Most care management modalities were carved out from primary care. Meta-analysis demonstrated a statistically significant but trivial reduction of HbA1c (weighted difference in means -0.21%, 95% confidence interval -0.40 to -0.03, p < .03) and LDL-cholesterol (weighted difference in means -3.38 mg/dL, 95% confidence interval -6.27 to -0.49, p < .02). Most care management programs for patients with type 2 diabetes are 'carved-out', accomplish limited effects on metabolic outcomes, and have unknown effects on patient important outcomes. Comparative effectiveness research of different models of care management is needed to inform the design of medical homes for patients with chronic conditions.

  7. 7 CFR 3403.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and any small business concern for the performance of experimental, developmental, or research work... in determining power to control its management. Outcomes are the measure of long-term, eventual, program impact. Outputs are the measures of near-term program impact. Peer review group means experts or...

  8. Engineering graduates' skill sets in the MENA region: a gap analysis of industry expectations and satisfaction

    NASA Astrophysics Data System (ADS)

    Ramadi, Eric; Ramadi, Serge; Nasr, Karim

    2016-01-01

    This study explored gaps between industry expectations and perceptions of engineering graduates' skill sets in the Middle East and North Africa (MENA) region. This study measured the importance that managers of engineers placed on 36 skills relevant to engineers. Also measured was managers' satisfaction with engineering graduates' skill sets. Importance and satisfaction were used to calculate skill gaps for each skill. A principal components analysis was then performed, consolidating the 36 skills into 8 categories. The means of importance, satisfaction, and skill gaps were ranked to determine the areas in which graduates needed improvement. Results showed significant gaps between managers' expectations of and satisfaction with all 36 skills. The areas in which managers felt that graduates needed most improvement were communication, time management, and continuous learning. Managers reported that recent engineering graduates exhibited low overall preparedness for employment. These findings may help to inform curricular reform in engineering education.

  9. Management accounting for advanced technological environments.

    PubMed

    Kaplan, R S

    1989-08-25

    Management accounting systems designed decades ago no longer provide timely, relevant information for companies in today's highly competitive environment. New operational control and performance measurement systems are recognizing the importance of direct measurement of quality, manufacturing lead times, flexibility, and customer responsiveness, as well as more accurate measures of the actual costs of consumed resources. Activity-based cost systems can assign the costs of indirect and support resources to the specific products and activities that benefit from these resources. Both operational control and activity-based systems represent new opportunities for improved managerial information in complex, technologically advanced environments.

  10. Cooperation for a competitive position: The impact of hospital cooperation behavior on organizational performance.

    PubMed

    Büchner, Vera Antonia; Hinz, Vera; Schreyögg, Jonas

    2015-01-01

    Several public policy initiatives, particularly those involving managed care, aim to enhance cooperation between partners in the health care sector because it is expected that such cooperation will reduce costs and generate additional revenue. However, empirical evidence regarding the effects of cooperation on hospital performance is scarce, particularly with respect to creating a comprehensive measure of cooperation behavior. The aim of this study is to investigate the impact of hospital cooperation behavior on organizational performance. We differentiate between horizontal and vertical cooperation using two alternative measures-cooperation depth and cooperation breadth-and include the interaction effects between both cooperation directions. Data are derived from a survey of German hospitals and combined with objective performance information from annual financial statements. Generalized linear regression models are used. The study findings provide insight into the nature of hospitals' cooperation behavior. In particular, we show that there are negative synergies between horizontal administrative cooperation behavior and vertical cooperation behavior. Whereas the depth and breadth of horizontal administrative cooperation positively affect financial performance (when there is no vertical cooperation), vertical cooperation positively affects financial performance (when there is no horizontal administrative cooperation) only when cooperation is broad (rather than deep). Horizontal cooperation is generally more effective than vertical cooperation at improving financial performance. Hospital managers should consider the negative interaction effect when making decisions about whether to recommend a cooperative relationship in a horizontal or vertical direction. In addition, managers should be aware of the limited financial benefit of cooperation behavior.

  11. ‘Wasteaware’ benchmark indicators for integrated sustainable waste management in cities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, David C., E-mail: waste@davidcwilson.com; Rodic, Ljiljana; Cowing, Michael J.

    Highlights: • Solid waste management (SWM) is a key utility service, but data is often lacking. • Measuring their SWM performance helps a city establish priorities for action. • The Wasteaware benchmark indicators: measure both technical and governance aspects. • Have been developed over 5 years and tested in more than 50 cities on 6 continents. • Enable consistent comparison between cities and countries and monitoring progress. - Abstract: This paper addresses a major problem in international solid waste management, which is twofold: a lack of data, and a lack of consistent data to allow comparison between cities. The papermore » presents an indicator set for integrated sustainable waste management (ISWM) in cities both North and South, to allow benchmarking of a city’s performance, comparing cities and monitoring developments over time. It builds on pioneering work for UN-Habitat’s solid waste management in the World’s cities. The comprehensive analytical framework of a city’s solid waste management system is divided into two overlapping ‘triangles’ – one comprising the three physical components, i.e. collection, recycling, and disposal, and the other comprising three governance aspects, i.e. inclusivity; financial sustainability; and sound institutions and proactive policies. The indicator set includes essential quantitative indicators as well as qualitative composite indicators. This updated and revised ‘Wasteaware’ set of ISWM benchmark indicators is the cumulative result of testing various prototypes in more than 50 cities around the world. This experience confirms the utility of indicators in allowing comprehensive performance measurement and comparison of both ‘hard’ physical components and ‘soft’ governance aspects; and in prioritising ‘next steps’ in developing a city’s solid waste management system, by identifying both local strengths that can be built on and weak points to be addressed. The Wasteaware ISWM indicators are applicable to a broad range of cities with very different levels of income and solid waste management practices. Their wide application as a standard methodology will help to fill the historical data gap.« less

  12. Training and Validation of Standardized Patients for Unannounced Assessment of Physicians' Management of Depression

    ERIC Educational Resources Information Center

    Shirazi, Mandana; Sadeghi, Majid; Emami, A.; Kashani, A. Sabouri; Parikh, Sagar; Alaeddini, F.; Arbabi, Mohammad; Wahlstrom, Rolf

    2011-01-01

    Objective: Standardized patients (SPs) have been developed to measure practitioner performance in actual practice settings, but results have not been fully validated for psychiatric disorders. This study describes the process of creating reliable and valid SPs for unannounced assessment of general-practitioners' management of depression disorders…

  13. An Analytical Method for Measuring Competence in Project Management

    ERIC Educational Resources Information Center

    González-Marcos, Ana; Alba-Elías, Fernando; Ordieres-Meré, Joaquín

    2016-01-01

    The goal of this paper is to present a competence assessment method in project management that is based on participants' performance and value creation. It seeks to close an existing gap in competence assessment in higher education. The proposed method relies on information and communication technology (ICT) tools and combines Project Management…

  14. Evaluation of CSM-CROPGRO-Cotton for simulating effects of management and climate change on cotton growth and evapotranspiration in an arid environment

    USDA-ARS?s Scientific Manuscript database

    Originally developed for simulating soybean growth and development, the CROPGRO model was recently re-parameterized for cotton. However, further efforts are necessary to evaluate the model's performance against field measurements for new environments and management options. The objective of this stu...

  15. Technical Performance Measurement, Earned Value, and Risk Management: An Integrated Diagnostic Tool for Program Management

    DTIC Science & Technology

    2002-06-01

    time, the monkey would eventually produce the collected works of Shakespeare . Unfortunately for the analogist, systems, even live ones, do not work...limited his simulated computer monkey to producing, in a single random step, the sentence uttered by Polonius in the play Hamlet : “Methinks it is

  16. The Value of Information: Approaches in Economics, Accounting, and Management Science.

    ERIC Educational Resources Information Center

    Repo, Aatto J.

    1989-01-01

    This review and analysis of research on the economics of information performed by economists, accounting researchers, and management scientists focuses on their approaches to describing and measuring the value of information. The discussion includes comparisons of research approaches based on cost effectiveness and on the value of information. (77…

  17. Case management redesign in an urban facility.

    PubMed

    Almaden, Stefany; Freshman, Brenda; Quaye, Beverly

    2011-01-01

    To explore strategies for improving patient throughput and to redesign case management processes to facilitate level of care transitions and safe discharges. Large Urban Medical Center in South Los Angeles County, with 384 licensed beds that services poor, underserved communities. Both qualitative and quantitative methods were applied. Combined theoretical frameworks were used for needs assessment, intervention strategies, and change management. Observations, interviews, surveys, and database extraction methods were used. The sample consisted of case management staff members and several other staff from nursing, social work, and emergency department staff. Postintervention measures indicated improvement in reimbursements for services, reduction in length of stay, increased productivity, improved patients' access to care, and avoiding unnecessary readmission or emergency department visits. Effective change management strategies must consider multiple factors that influence daily operations and service delivery. Creating accountability by using performance measures associated with patient transitions is highlighted by the case study results. The authors developed a process model to assist in identifying and tracking outcome measures related to patient throughput, front-end assessments, and effective patient care transitions. This model can be used in future research to further investigate best case management practices.

  18. Sustainability of quality improvement following removal of pay-for-performance incentives.

    PubMed

    Benzer, Justin K; Young, Gary J; Burgess, James F; Baker, Errol; Mohr, David C; Charns, Martin P; Kaboli, Peter J

    2014-01-01

    Although pay-for-performance (P4P) has become a central strategy for improving quality in US healthcare, questions persist about the effectiveness of these programs. A key question is whether quality improvement that occurs as a result of P4P programs is sustainable, particularly if incentives are removed. To investigate sustainability of performance levels following removal of performance-based incentives. Observational cohort study that capitalized on a P4P program within the Veterans Health Administration (VA) that included adoption and subsequent removal of performance-based incentives for selected inpatient quality measures. The study sample comprised 128 acute care VA hospitals where performance was assessed between 2004 and 2010. VA system managers set annual performance goals in consultation with clinical leaders, and report performance scores to medical centers on a quarterly basis. These scores inform performance-based incentives for facilities and their managers. Bonuses are distributed based on the attainment of these performance goals. Seven quality of care measures for acute coronary syndrome, heart failure, and pneumonia linked to performance-based incentives. Significant improvements in performance were observed for six of seven quality of care measures following adoption of performance-based incentives and were maintained up to the removal of the incentive; subsequently, the observed performance levels were sustained. This is a quasi-experimental study without a comparison group; causal conclusions are limited. The maintenance of performance levels after removal of a performance-based incentive has implications for the implementation of Medicare's value-based purchasing initiative and other P4P programs. Additional research is needed to better understand human and system-level factors that mediate sustainability of performance-based incentives.

  19. Assessing reliability and validity measures in managed care studies.

    PubMed

    Montoya, Isaac D

    2003-01-01

    To review the reliability and validity literature and develop an understanding of these concepts as applied to managed care studies. Reliability is a test of how well an instrument measures the same input at varying times and under varying conditions. Validity is a test of how accurately an instrument measures what one believes is being measured. A review of reliability and validity instructional material was conducted. Studies of managed care practices and programs abound. However, many of these studies utilize measurement instruments that were developed for other purposes or for a population other than the one being sampled. In other cases, instruments have been developed without any testing of the instrument's performance. The lack of reliability and validity information may limit the value of these studies. This is particularly true when data are collected for one purpose and used for another. The usefulness of certain studies without reliability and validity measures is questionable, especially in cases where the literature contradicts itself

  20. 15 CFR 291.2 - Environmental integration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... activity, and “customer satisfaction” measures of performance. (5) Management experience and plans... defined. The manufacturing center must demonstrate that it understands the populations environmentally...

  1. Empowerment at Pacific Gas & Electric.

    ERIC Educational Resources Information Center

    Kaufman, Steven B.

    1991-01-01

    Pacific Gas and Electric's employee involvement program aggressively focuses on customer service, performance measurement tied to management bonuses, and commitment to change in the organizational culture. (SK)

  2. Correlation between safety climate and contractor safety assessment programs in construction

    PubMed Central

    Sparer, EH1; Murphy, LA; Taylor, KM; Dennerlein, Jt

    2015-01-01

    Background Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Methods 401 construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. Results There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers’ safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. Conclusions A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. PMID:24038403

  3. Measuring Institutional Performance in Higher Education.

    ERIC Educational Resources Information Center

    Meyerson, Joel W., Ed.; Massy, William F., Ed.

    This collection of seven essays from the Stanford Forum for Higher Education Futures focuses on how downsizing, quality management, and reengineering have are affecting higher education. An introductory paper, "Introduction: Change in Higher Education: Its Effect on Institutional Performance," (Joel W. Meyerson and Sandra L. Johnson)…

  4. The Role of Reliability, Vulnerability and Resilience in the Management of Water Quality Systems

    NASA Astrophysics Data System (ADS)

    Lence, B. J.; Maier, H. R.

    2001-05-01

    The risk based performance indicators reliability, vulnerability and resilience provide measures of the frequency, magnitude and duration of the failure of water resources systems, respectively. They have been applied primarily to water supply problems, including the assessment of the performance of reservoirs and water distribution systems. Applications to water quality case studies have been limited, although the need to consider the length and magnitude of violations of a particular water quality standard has been recognized for some time. In this research, the role of reliability, vulnerability and resilience in water quality management applications is investigated by examining their significance as performance measures for water quality systems and assessing their potential for assisting in decision making processes. The importance of each performance indicator is discussed and a framework for classifying such systems, based on the relative significance of each of these indicators, is introduced and illustrated qualitatively with various case studies. Quantitative examples drawn from both lake and river water quality modeling exercises are then provided.

  5. Using info-Gap Decision Theory for Water Resources Planning Under Severe Uncertainty

    NASA Astrophysics Data System (ADS)

    Korteling, B.; Brazier, R.; Kapelan, Z.; Dessai, S.

    2012-12-01

    Water resource managers are required to develop comprehensive water resource plans based on severely uncertain information of the effects of climate change on local hydrology and future socio-economic changes on localised demand. In England and Wales, current water resource planning methodologies include a headroom estimation process that quantifies uncertainty based on only one point of an assumed range of deviations from the expected climate and projected demand 25 years into the future. There are many situations where there is not enough knowledge to be able to estimate a representative probability of occurrence, or to be confident that the tails of an assumed probability distribution will not exhibit unexpected skewness, or that the kurtosis of a distribution differs from the norm. These situations can be considered severely uncertain. Information-Gap decision theory offers a method to sample a wider range of uncertainty than with traditional methods, and as a result, compare the robustness of various water resource management options under conditions of severe uncertainty. A more robust management option is one that delivers the same level of performance as other options at higher levels of uncertainty. A case study is based on a Water Supply Area that encompasses the county of Cornwall in southwest England containing 17 reservoirs and 19 demand nodes. The performance success of management options are evaluated primarily by measures of water availability including a reservoir risk measure that tests the probability and magnitude that strategic reservoir storage levels fall below the drought management curve under adverse conditions and also a safety margin deficit that tests how quickly reservoir levels can return to optimum operating levels in favourable conditions. Multi-Criteria Decision Analysis (MCDA) is used to test the effectiveness of different management options with different weightings for metrics other than water availability including; capital and operating costs, costs to customers, carbon emissions, environmental impact and social acceptability. Findings show that beyond the uncertainty range explored with the traditional headroom method, preference reversals can occur, i.e. some management options that underperform at lower uncertainties, outperform at higher levels of uncertainty. This study also shows that when 50% or more of the population adopts demand side management, efficiency related measures and innovative options such as rainwater collection can perform equally well or better than some supply side options. The additional use of MCDA shifts the focus away from reservoir expansion options that perform best with respect to water availability, to combined strategies that include innovative demand side management actions of rainwater collection and greywater reuse as well as efficiency measures and additional regional transfers. This research illustrates how an Info-Gap based approach can offer a comprehensive picture of potential supply/demand futures and a rich variety of information to support adaptive management of water systems under severe uncertainty.

  6. Simulation-based Assessment of the Management of Critical Events by Board-certified Anesthesiologists.

    PubMed

    Weinger, Matthew B; Banerjee, Arna; Burden, Amanda R; McIvor, William R; Boulet, John; Cooper, Jeffrey B; Steadman, Randolph; Shotwell, Matthew S; Slagle, Jason M; DeMaria, Samuel; Torsher, Laurence; Sinz, Elizabeth; Levine, Adam I; Rask, John; Davis, Fred; Park, Christine; Gaba, David M

    2017-09-01

    We sought to determine whether mannequin-based simulation can reliably characterize how board-certified anesthesiologists manage simulated medical emergencies. Our primary focus was to identify gaps in performance and to establish psychometric properties of the assessment methods. A total of 263 consenting board-certified anesthesiologists participating in existing simulation-based maintenance of certification courses at one of eight simulation centers were video recorded performing simulated emergency scenarios. Each participated in two 20-min, standardized, high-fidelity simulated medical crisis scenarios, once each as primary anesthesiologist and first responder. Via a Delphi technique, an independent panel of expert anesthesiologists identified critical performance elements for each scenario. Trained, blinded anesthesiologists rated video recordings using standardized rating tools. Measures included the percentage of critical performance elements observed and holistic (one to nine ordinal scale) ratings of participant's technical and nontechnical performance. Raters also judged whether the performance was at a level expected of a board-certified anesthesiologist. Rater reliability for most measures was good. In 284 simulated emergencies, participants were rated as successfully completing 81% (interquartile range, 75 to 90%) of the critical performance elements. The median rating of both technical and nontechnical holistic performance was five, distributed across the nine-point scale. Approximately one-quarter of participants received low holistic ratings (i.e., three or less). Higher-rated performances were associated with younger age but not with previous simulation experience or other individual characteristics. Calling for help was associated with better individual and team performance. Standardized simulation-based assessment identified performance gaps informing opportunities for improvement. If a substantial proportion of experienced anesthesiologists struggle with managing medical emergencies, continuing medical education activities should be reevaluated.

  7. Strategic management system in a healthcare setting--moving from strategy to results.

    PubMed

    Devitt, Rob; Klassen, Wolf; Martalog, Julian

    2005-01-01

    One of the historical challenges in the healthcare system has been the identification and collection of meaningful data to measure an organization's progress towards the achievement of its strategic goals and the concurrent alignment of internal operating practices with this strategy. Over the last 18 months the Toronto East General Hospital (TEGH) has adopted a strategic management system and organizing framework that has led to a metric-based strategic plan. It has allowed for formal and measurable linkages across a full range of internal business processes, from the annual operating plan to resource allocation decisions, to the balanced scorecard and individual performance evaluations. The Strategic Management System (SMS) aligns organizational planning and performance measurement, facilitates an appropriate balance between organizational priorities and resolving "local" problems, and encourages behaviours that are consistent with the values upon which the organization is built. The TEGH Accountability Framework serves as the foundation for the entire system. A key tool of the system is the rolling three-year strategic plan for the organization that sets out specific annual improvement targets on a number of key strategic measures. Individual program/department plans with corresponding measures ensure that the entire organization is moving forward strategically. Each year, all plans are reviewed, with course adjustments made to reflect changes in the hospital's environment and with re-calibration of performance targets for the next three years to ensure continued improvement and organizational progress. This system has been used through one annual business cycle. Results from the past year show measurable success. The hospital has improved on 12 of the 15 strategic plan metrics, including achieving the targeted 1% operating surplus while operating in an environment of tremendous change and uncertainty. This article describes the strategic management system used at TEGH and demonstrates the formal integration of the plan into its operating and decision making processes. It also provides examples of the metrics, their use in decision-making and the variance reporting and improvement mechanisms. The article also demonstrates that a measurement-oriented approach to the planning and delivery of community hospital service is both achievable and valuable in terms of accountability and organizational responsiveness.

  8. Disability management: the application of preventive measures, health promotion and case management in Italy.

    PubMed

    La Torre, G; De Giusti, M; Mannocci, A; De Waure, C; Agostinelli, A; Schena, S; Capelli, G; Ricciardi, W; Boccia, A; Damiani, G; von Pinoci, M; Fanton, C; Federico, B

    2009-03-01

    Disability Management can be defined as a practice to improve workers' health and to reduce the impact and costs of disability. The aim of the study was to estimate the diffusion of DM in Italian companies. A survey was conducted using a questionnaire, the Worksite Disability Management Audit. The questionnaire was structured into five parts addressing the following domains: 1) characteristics of the company; 2) health promotion activities; 3) preventive measures; 4) case management; 5) disability management. We selected public and private companies and collected information by direct interview. Twenty companies entered the survey. Twelve Companies (60%) indicated that health promotion programs and sensibilisation campaigns are usually carried out. The presence of an individual who provided workplace safety indications and materials was stated by 19 companies (95%). Periodical medical examinations are carried out by 19 companies (95%); 16 (80%) have an evaluation process for ergonomics concerns. Risk assessment and analysis are performed by all companies and the security procedures and policies are updated at least once in a year in 40% of cases. Health status monitoring of injured workers is performed in eight (40%) of the companies, while Disability Management is present as a whole in only three companies. This survey highlights that Disability Management is not undertaken in most companies and that, where applied, there is still confusion and disorganization about ways to promote health and manage workers' illness and disability. Hence, there is still the need to promote an all-inclusive evaluation and management of workers' safety, illness and disabilities.

  9. Validation of Storm Water Management Model Storm Control Measures Modules

    NASA Astrophysics Data System (ADS)

    Simon, M. A.; Platz, M. C.

    2017-12-01

    EPA's Storm Water Management Model (SWMM) is a computational code heavily relied upon by industry for the simulation of wastewater and stormwater infrastructure performance. Many municipalities are relying on SWMM results to design multi-billion-dollar, multi-decade infrastructure upgrades. Since the 1970's, EPA and others have developed five major releases, the most recent ones containing storm control measures modules for green infrastructure. The main objective of this study was to quantify the accuracy with which SWMM v5.1.10 simulates the hydrologic activity of previously monitored low impact developments. Model performance was evaluated with a mathematical comparison of outflow hydrographs and total outflow volumes, using empirical data and a multi-event, multi-objective calibration method. The calibration methodology utilized PEST++ Version 3, a parameter estimation tool, which aided in the selection of unmeasured hydrologic parameters. From the validation study and sensitivity analysis, several model improvements were identified to advance SWMM LID Module performance for permeable pavements, infiltration units and green roofs, and these were performed and reported herein. Overall, it was determined that SWMM can successfully simulate low impact development controls given accurate model confirmation, parameter measurement, and model calibration.

  10. Implementation of ANP Method in Determining Supplier to Improve Service towards Supermarket Consumers

    NASA Astrophysics Data System (ADS)

    Mulyanto, A.; Amalia, T. H.; Novian, D.; Kaluku, M. R. A.

    2017-03-01

    Performance assessment on the supplier by the supermarket manager is relatively difficult to conduct and implies subjectivity, because there is no measureable and objective performance indicator. This study aims to assist in the decision making process and to look for alternative solutions in assessing the performance of each supplier, so that the service towards the customers will improve as well. ANP method is used to find the weight of each sub-criteria that will be used to measure the supplier performance. The weight result of each sub-criteria derived from the ANP method is used again in measuring the performance and to rank the performance of each supplier by using TOPSIS method. Performance measuring by using the ANP and TOPSIS that generates the highest value of the supplier is 0.71666 while the lowest value is 0.24825. The result of this study shows that the ANP and TOPSIS methods can be used to measure the supplier performance therefore it can assist the selection of supplier which can increase service towards the mart’s consumers.

  11. Splint: the efficacy of orthotic management in rest to prevent equinus in children with cerebral palsy, a randomised controlled trial.

    PubMed

    Maas, Josina C; Dallmeijer, Annet J; Huijing, Peter A; Brunstrom-Hernandez, Janice E; van Kampen, Petra J; Jaspers, Richard T; Becher, Jules G

    2012-03-26

    Range of motion deficits of the lower extremity occur in about the half of the children with spastic cerebral palsy (CP). Over time, these impairments can cause joint deformities and deviations in the children's gait pattern, leading to limitations in moblity. Preventing a loss of range of motion is important in order to reduce secondary activity limitations and joint deformities. Sustained muscle stretch, imposed by orthotic management in rest, might be an effective method of preventing a decrease in range of motion. However, no controlled study has been performed. A single blind randomised controlled trial will be performed in 66 children with spastic CP, divided over three groups with each 22 participants. Two groups will be treated for 1 year with orthoses to prevent a decrease in range of motion in the ankle (either with static or dynamic knee-ankle-foot-orthoses) and a third group will be included as a control group and will receive usual care (physical therapy, manual stretching). Measurements will be performed at baseline and at 3, 6, 9 and 12 months after treatment allocation. The primary outcome measure will be ankle dorsiflexion at full knee extension, measured with a custom designed hand held dynamometer. Secondary outcome measures will be i) ankle and knee flexion during gait and ii) gross motor function. Furthermore, to gain more insight in the working mechanism of the orthotic management in rest, morphological parameters like achilles tendon length, muscle belly length, muscle fascicle length, muscle physiological cross sectional area length and fascicle pennation angle will be measured in a subgroup of 18 participants using a 3D imaging technique. This randomised controlled trial will provide more insight into the efficacy of orthotic management in rest and the working mechanisms behind this treatment. The results of this study could lead to improved treatments. Nederlands Trial Register NTR2091.

  12. Developing an Index to Measure Health System Performance: Measurement for Districts of Nepal.

    PubMed

    Kandel, N; Fric, A; Lamichhane, J

    2014-01-01

    Various frameworks for measuring health system performance have been proposed and discussed. The scope of using performance indicators are broad, ranging from examining national health system to individual patients at various levels of health system. Development of innovative and easy index is essential to measure multidimensionality of health systems. We used indicators, which also serve as proxy to the set of activities, whose primary goal is to maintain and improve health. We used eleven indicators of MDGs, which represent all dimensions of health to develop index. These indicators are computed with similar methodology that of human development index. We used published data of Nepal for computation of the index for districts of Nepal as an illustration. To validate our finding, we compared the indices of these districts with other development indices of Nepal. An index for each district has been computed from eleven indicators. Then indices are compared with that of human development index, socio-economic and infrastructure development indices and findings has shown the similarity on distribution of districts. Categories of low and high performing districts on health system performance are also having low and high human development, socio-economic, and infrastructure indices respectively. This methodology of computing index from various indicators could assist policy makers and program managers to prioritize activities based on their performance. Validation of the findings with that of other development indicators show that this can be one of the tools, which can assist on assessing health system performance for policy makers, program managers and others.

  13. Cost sharing and HEDIS performance.

    PubMed

    Chernew, Michael; Gibson, Teresa B

    2008-12-01

    Physicians, health plans, and health systems are increasingly evaluated and rewarded based on Health Plan Effectiveness Data and Information Set (HEDIS) and HEDIS-like performance measures. Concurrently, employers and health plans continue to try to control expenditures by increasing out-of-pocket costs for patients. The authors use fixed-effect logit models to assess how rising copayment rates for physician office visits and prescription drugs affect performance on HEDIS measures. Findings suggest that the increase in copayment rates lowers performance scores, demonstrating the connection between financial aspects of plan design and quality performance, and highlighting the potential weakness of holding plans and providers responsible for performance when payers and benefit plan managers also influence performance. Yet the effects are not consistent across all domains and, in many cases, are relatively modest in magnitude. This may reflect the HEDIS definitions and suggests that more sensitive measures may capture the impact of benefit design changes on performance.

  14. Facilities | Transportation Research | NREL

    Science.gov Websites

    detailed chemical characterization, performance property measurements, and stability research. Photo of Technology Evaluation Center This off-network data center provides secure management, storage, and processing

  15. Autonomic Management in a Distributed Storage System

    NASA Astrophysics Data System (ADS)

    Tauber, Markus

    2010-07-01

    This thesis investigates the application of autonomic management to a distributed storage system. Effects on performance and resource consumption were measured in experiments, which were carried out in a local area test-bed. The experiments were conducted with components of one specific distributed storage system, but seek to be applicable to a wide range of such systems, in particular those exposed to varying conditions. The perceived characteristics of distributed storage systems depend on their configuration parameters and on various dynamic conditions. For a given set of conditions, one specific configuration may be better than another with respect to measures such as resource consumption and performance. Here, configuration parameter values were set dynamically and the results compared with a static configuration. It was hypothesised that under non-changing conditions this would allow the system to converge on a configuration that was more suitable than any that could be set a priori. Furthermore, the system could react to a change in conditions by adopting a more appropriate configuration. Autonomic management was applied to the peer-to-peer (P2P) and data retrieval components of ASA, a distributed storage system. The effects were measured experimentally for various workload and churn patterns. The management policies and mechanisms were implemented using a generic autonomic management framework developed during this work. The experimental evaluations of autonomic management show promising results, and suggest several future research topics. The findings of this thesis could be exploited in building other distributed storage systems that focus on harnessing storage on user workstations, since these are particularly likely to be exposed to varying, unpredictable conditions.

  16. Predictors and Effects of Knowledge Management in U.S. Colleges and Schools of Pharmacy

    NASA Astrophysics Data System (ADS)

    Watcharadamrongkun, Suntaree

    Public demands for accountability in higher education have placed increasing pressure on institutions to document their achievement of critical outcomes. These demands also have had wide-reaching implications for the development and enforcement of accreditation standards, including those governing pharmacy education. The knowledge management (KM) framework provides perspective for understanding how organizations evaluate themselves and guidance for how to improve their performance. In this study, we explore knowledge management processes, how these processes are affected by organizational structure and by information technology resources, and how these processes affect organizational performance. This is done in the context of Accreditation Standards and Guidelines for the Professional Program in Pharmacy Leading to the Doctor of Pharmacy Degree (Standards 2007). Data were collected using an online census survey of 121 U.S. Colleges and Schools of Pharmacy and supplemented with archival data. A key informant method was used with CEO Deans and Assessment leaders serving as respondents. The survey yielded a 76.0% (92/121) response rate. Exploratory factor analysis was used to construct scales (and scales) describing core KM processes: Knowledge Acquisition, Knowledge Integration, and Institutionalization; all scale reliabilities were found to be acceptable. Analysis showed that, as expected, greater Knowledge Acquisition predicts greater Knowledge Integration and greater Knowledge Integration predicts greater Institutionalization. Predictive models were constructed using hierarchical multiple regression and path analysis. Overall, information technology resources had stronger effects on KM processes than did characteristics of organizational structure. Greater Institutionalization predicted better outcomes related to direct measures of performance (i.e., NAPLEX pass rates, Accreditation actions) but Institutionalization was unrelated to an indirect measure of performance (i.e., USNWR ratings). Several organizational structure characteristics (i.e., size, age, and being part of an academic health center) were significant predictors of organizational performance; in contrast, IT resources had no direct effects on performance. Findings suggest that knowledge management processes, organizational structures and IT resources are related to better performance for Colleges and Schools of Pharmacy. Further research is needed to understand mechanisms through which specific knowledge management processes translate into better performance and, relatedly, to establish how enhancing KM processes can be used to improve institutional quality.

  17. Managing for Results in America's Great City Schools: A Report of the Performance Measurement and Benchmarking Project of the Council of the Great City Schools

    ERIC Educational Resources Information Center

    Eugene, Michael; Carlson, Robert; Hrowal, Heidi; Fahey, John; Ronnei, Jean; Young, Steve; Gomez, Joseph; Thomas, Michael

    2007-01-01

    This report describes 50 initial statistical indicators developed by the Council of the Great City Schools and its member districts to measure big-city school performance on a range of operational and business functions, and presents data city-by-city on those indicators. The analysis marks the first time that such indicators have been developed…

  18. Technology transfer through performance management: the effects of graphical feedback and positive reinforcement on drug treatment counselors' behavior.

    PubMed

    Andrzejewski, M E; Kirby, K C; Morral, A R; Iguchi, M Y

    2001-07-01

    After drug treatment counselors at a community-based methadone treatment clinic were trained in implementing a contingency management (CM) intervention, baseline measures of performance revealed that, on average, counselors were meeting the performance criteria specified by the treatment protocol about 42% of the time. Counselors were exposed to graphical feedback and a drawing for cash prizes in an additive within-subjects design to assess the effectiveness of these interventions in improving protocol adherence. Counselor performance measures increased to 71% during the graphical feedback condition, and to 81% during the drawing. Each counselor's performance improved during the intervention conditions. Additional analyses suggested that counselors did not have skill deficits that hindered implementation. Rather, protocol implementation occurred more frequently when consequences were added, thereby increasing the overall proportion of criteria met. Generalizations, however, may be limited due to a small sample size and possible confounding of time and intervention effects. Nonetheless, present results show promise that feedback and positive reinforcement could be used to improve technology transfer of behavioral interventions into community clinic settings.

  19. NASA Performance Plan

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The Government Performance and Results Act (GPRA) passed by Congress and signed by the President in 1993 provides a new tool to improve the efficiency of all Federal agencies. The goals of GPRA are to: Improve citizen confidence in Government performance; Improve Federal program management, effectiveness, and public accountability; and Improve congressional decisionmaking on where to commit the Nation's financial and human resources. The Act directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The first plans were submitted in September 1998 as part of the Fiscal Year 1999 (FY99) budget process. These budget submissions were expected to support the goals expressed in the agency strategic plans. The Act also directs agencies to manage and measure results to justify congressional appropriations and authorizations. Six months after the completion of the fiscal year, agencies will report on the degree of success in achieving the goals and evaluation measures defined in the strategic and performance plans. The plans required by GPRA have been submitted to the Office of Management and Budget (OMB) and to Congress. Copies of NASA plans are available from the Office of Policy and Plans at NASA Headquarters and can be accessed on the i nterinet web sites identified in the Appendix.

  20. Operator strategies under varying conditions of workload

    NASA Technical Reports Server (NTRS)

    Arnegard, Ruth J.

    1991-01-01

    An attempt was made to operationally define and measure strategic behavior in a complex multiple task environment. The Multi-Attribute Task battery was developed to simulate various aspects of flight and consisted of an auditory communication task, monitoring tasks, a tracking tasks, a resource management task which allowed a wide range of responding patterns, and a scheduling window which allowed operators to predict changes in workload. This battery was validated for its sensitivity to strategic behavior, and baseline measures for each individual task were collected. Twenty-four undergraduate and graduate students then performed the battery for four 64 minute sessions which took place over a period of 2 days. Each subject performed the task battery under four levels of workload, which were presented for equal lengths of time during all four sessions. Results indicated that in general, performance improves as a function of experience with the battery, but that performance decreased as workload level increased. The data also showed that subjects developed strategies for responding to the resource management task which allowed them to manage the high workload levels more efficiently. This particular strategy developed over time but was also associated with errors of complacency. These results are presented along with implications for the aviation field and areas of future research.

  1. Stress management standards: a warning indicator for employee health.

    PubMed

    Kazi, A; Haslam, C O

    2013-07-01

    Psychological stress is a major cause of lost working days in the UK. The Health & Safety Executive (HSE) has developed management standards (MS) to help organizations to assess work-related stress. To investigate the relationships between the MS indicator tool and employee health, job attitudes, work performance and environmental outcomes. The first phase involved a survey employing the MS indicator tool, General Health Questionnaire-12 (GHQ-12), job attitudes, work performance and environmental measures in a call centre from a large utility company. The second phase comprised six focus groups to investigate what employees believed contributed to their perceived stress. Three hundred and four call centre employees responded with a response rate of 85%. Significant negative correlations were found between GHQ-12 and two MS dimensions; demands (Rho = -0.211, P < 0.001) and relationships (Rho= -0.134, P < 0.05). Other dimensions showed no significant relationship with GHQ-12. Higher levels of stress were associated with reduced job performance, job motivation and increased intention to quit but low stress levels were associated with reduced job satisfaction. Lack of management support, recognition and development opportunities were identified as sources of stress. The findings support the utility of the MS as a measure of employee attitudes and performance.

  2. Value acceleration: lessons from private-equity masters.

    PubMed

    Rogers, Paul; Holland, Tom; Haas, Dan

    2002-06-01

    The most successful private-equity firms regularly spearhead dramatic business transformations, creating exceptional returns for their investors. To understand how those firms do it, the authors studied more than 2,000 PE transactions over the past ten years and discovered that the top performers' success stems from the rigor with which they manage their businesses. This article describes the four management disciplines vital to the success of the best PE firms. First, for each business, they define an investment thesis: a brief, clear statement of how to make the business more valuable within three to five years. The thesis, which guides all actions by the company, usually focuses on growth. PE firms know that the demonstration of a path to strong growth produces the big returns on investment. Second, they don't measure too much. They zero in on a few financial indicators that most clearly reveal the business's progress in increasing its value. They watch cash more closely than earnings and tailor performance measures to each business, rather than imposing one set of measures across their entire portfolio. Third, they work their balance sheets, mining undervalued assets, turning fixed assets into sources of financing, and aggressively managing their physical capital. Last, they make the center the shareholder. Corporate staffs in PE firms make unsentimental investment decisions, buying and selling businesses when the price is right and bringing in new management when performance falters. These firms also keep their corporate centers extremely lean. By adopting these four disciplines, executives at public companies should be able to reap significantly greater returns from their own business units.

  3. The Strategic Data Project's Strategic Performance Indicators

    ERIC Educational Resources Information Center

    Page, Lindsay C.; Fullerton, Jon; Bacher-Hicks, Andrew; Owens, Antoniya; Cohodes, Sarah R.; West, Martin R.; Glover, Sarah

    2013-01-01

    Strategic Performance Indicators (SPIs) are summary measures derived from parallel, descriptive analyses conducted across educational agencies. The SPIs are designed to inform agency management and efforts to improve student outcomes. We developed the SPIs to reveal patterns common across partner agencies, to highlight exceptions to those…

  4. Learning strategies, study habits and social networking activity of undergraduate medical students.

    PubMed

    Bickerdike, Andrea; O'Deasmhunaigh, Conall; O'Flynn, Siun; O'Tuathaigh, Colm

    2016-07-17

    To determine learning strategies, study habits, and online social networking use of undergraduates at an Irish medical school, and their relationship with academic performance. A cross-sectional study was conducted in Year 2 and final year undergraduate-entry and graduate-entry students at an Irish medical school. Data about participants' demographics and educational background, study habits (including time management), and use of online media was collected using a self-report questionnaire. Participants' learning strategies were measured using the 18-item Approaches to Learning and Studying Inventory (ALSI). Year score percentage was the measure of academic achievement. The association between demographic/educational factors, learning strategies, study habits, and academic achievement was statistically analysed using regression analysis. Forty-two percent of students were included in this analysis (n=376). A last-minute "cramming" time management study strategy was associated with increased use of online social networks. Learning strategies differed between undergraduate- and graduate-entrants, with the latter less likely to adopt a 'surface approach' and more likely adopt a 'study monitoring' approach. Year score percentage was positively correlated with the 'effort management/organised studying' learning style. Poorer academic performance was associated with a poor time management approach to studying ("cramming") and increased use of the 'surface learning' strategy. Our study demonstrates that effort management and organised studying should be promoted, and surface learning discouraged, as part of any effort to optimise academic performance in medical school. Excessive use of social networking contributes to poor study habits, which are associated with reduced academic achievement.

  5. Evaluating success criteria and project monitoring in river enhancement within an adaptive management framework

    USGS Publications Warehouse

    O'Donnell, T. K.; Galat, D.L.

    2008-01-01

    Objective setting, performance measures, and accountability are important components of an adaptive-management approach to river-enhancement programs. Few lessons learned by river-enhancement practitioners in the United States have been documented and disseminated relative to the number of projects implemented. We conducted scripted telephone surveys with river-enhancement project managers and practitioners within the Upper Mississippi River Basin (UMRB) to determine the extent of setting project success criteria, monitoring, evaluation of monitoring data, and data dissemination. Investigation of these elements enabled a determination of those that inhibited adaptive management. Seventy river enhancement projects were surveyed. Only 34% of projects surveyed incorporated a quantified measure of project success. Managers most often relied on geophysical attributes of rivers when setting project success criteria, followed by biological communities. Ninety-one percent of projects that performed monitoring included biologic variables, but the lack of data collection before and after project completion and lack of field-based reference or control sites will make future assessments of ecologic success difficult. Twenty percent of projects that performed monitoring evaluated ???1 variable but did not disseminate their evaluations outside their organization. Results suggest greater incentives may be required to advance the science of river enhancement. Future river-enhancement programs within the UMRB and elsewhere can increase knowledge gained from individual projects by offering better guidance on setting success criteria before project initiation and evaluation through established monitoring protocols. ?? 2007 Springer Science+Business Media, LLC.

  6. Analysis of collaborative communication for linguistic cues of cognitive load.

    PubMed

    Khawaja, M Asif; Chen, Fang; Marcus, Nadine

    2012-08-01

    Analyses of novel linguistic and grammatical features, extracted from transcribed speech of people working in a collaborative environment, were performed for cognitive load measurement Prior studies have attempted to assess users' cognitive load with several measures, but most of them are intrusive and disrupt normal task flow. An effective measurement of people's cognitive load can help improve their performance by deploying appropriate output and support strategies accordingly. The authors studied 33 members of bushfire management teams working collaboratively in computerized incident control rooms and involved in complex bushfire management tasks. The participants' communication was analyzed for some novel linguistic features as potential indices of cognitive load, which included sentence length, use of agreement and disagreement phrases, and use of personal pronouns, including both singular and plural pronoun types. Results showed users' different linguistic and grammatical patterns with various cognitive load levels. Specifically, with high load, people spoke more and used longer sentences, used more words that indicated disagreement with other team members, and exhibited increased use of plural personal pronouns and decreased use of singular pronouns. The article provides encouraging evidence for the use of linguistic and grammatical analysis for measuring users' cognitive load and proposes some novel features as cognitive load indices. The proposed approach may be applied to many data-intense and safety-critical task scenarios, such as emergency management departments, for example, bushfire or traffic incident management centers; air traffic control rooms; and call centers, where speech is used as part of everyday tasks.

  7. Improving trends in gender disparities in the Department of Veterans Affairs: 2008-2013.

    PubMed

    Whitehead, Alison M; Czarnogorski, Maggie; Wright, Steve M; Hayes, Patricia M; Haskell, Sally G

    2014-09-01

    Increasing numbers of women veterans using Department of Veterans Affairs (VA) services has contributed to the need for equitable, high-quality care for women. The VA has evaluated performance measure data by gender since 2006. In 2008, the VA launched a 5-year women's health redesign, and, in 2011, gender disparity improvement was included on leadership performance plans. We examined data from VA Office of Analytics and Business Intelligence quarterly gender reports for trends in gender disparities in gender-neutral performance measures from 2008 to 2013. Through reporting of data by gender, leadership involvement, electronic reminders, and population management dashboards, VA has seen a decreasing trend in gender inequities on most Health Effectiveness Data and Information Set performance measures.

  8. The Fishery Performance Indicators: A Management Tool for Triple Bottom Line Outcomes

    PubMed Central

    Anderson, James L.; Anderson, Christopher M.; Chu, Jingjie; Meredith, Jennifer; Asche, Frank; Sylvia, Gil; Smith, Martin D.; Anggraeni, Dessy; Arthur, Robert; Guttormsen, Atle; McCluney, Jessica K.; Ward, Tim; Akpalu, Wisdom; Eggert, Håkan; Flores, Jimely; Freeman, Matthew A.; Holland, Daniel S.; Knapp, Gunnar; Kobayashi, Mimako; Larkin, Sherry; MacLauchlin, Kari; Schnier, Kurt; Soboil, Mark; Tveteras, Sigbjorn; Uchida, Hirotsugu; Valderrama, Diego

    2015-01-01

    Pursuit of the triple bottom line of economic, community and ecological sustainability has increased the complexity of fishery management; fisheries assessments require new types of data and analysis to guide science-based policy in addition to traditional biological information and modeling. We introduce the Fishery Performance Indicators (FPIs), a broadly applicable and flexible tool for assessing performance in individual fisheries, and for establishing cross-sectional links between enabling conditions, management strategies and triple bottom line outcomes. Conceptually separating measures of performance, the FPIs use 68 individual outcome metrics—coded on a 1 to 5 scale based on expert assessment to facilitate application to data poor fisheries and sectors—that can be partitioned into sector-based or triple-bottom-line sustainability-based interpretative indicators. Variation among outcomes is explained with 54 similarly structured metrics of inputs, management approaches and enabling conditions. Using 61 initial fishery case studies drawn from industrial and developing countries around the world, we demonstrate the inferential importance of tracking economic and community outcomes, in addition to resource status. PMID:25946194

  9. Assessing Practical Intelligence in Business School Admissions: A Supplement to the Graduate Management Admissions Test

    ERIC Educational Resources Information Center

    Hedlund, Jennifer; Wilt, Jeanne M.; Nebel, Kristina L.; Ashford, Susan J.; Sternberg, Robert J.

    2006-01-01

    The Graduate Management Admission Test (GMAT) is the most widely used measure of managerial potential in MBA admissions. GMAT scores, although predictive of grades in business school, leave much of the variance in graduate school performance unexplained. The GMAT also produces disparities in test scores between groups, generating the potential for…

  10. Information Management and Governance in UK Higher Education Institutions: Bringing IT in from the Cold

    ERIC Educational Resources Information Center

    Coen, Michael; Kelly, Ursula

    2007-01-01

    In the 21st Century, IT Governance is, within the broader corporate governance context, critical for all organisations. Those without an IT governance strategy face significant risks; those with one perform measurably better (Calder 2005). There has been little field based research on IT governance, and few publications help managers understand…

  11. 76 FR 59069 - Revision to the Section 8 Management Assessment Program Lease-Up Indicator

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ...-AC76 Revision to the Section 8 Management Assessment Program Lease-Up Indicator AGENCY: Office of the... process by which HUD measures and verifies performance under the SEMAP lease-up indicator. Specifically... (PHA) leasing indicator will be based on a calendar year cycle, rather than a fiscal year cycle, which...

  12. Prospective memory in schizophrenia: relationship to medication management skills, neurocognition, and symptoms in individuals with schizophrenia.

    PubMed

    Raskin, Sarah A; Maye, Jacqueline; Rogers, Alexandra; Correll, David; Zamroziewicz, Marta; Kurtz, Matthew

    2014-05-01

    Impaired adherence to medication regimens is a serious concern for individuals with schizophrenia linked to relapse and poorer outcomes. One possible reason for poor adherence to medication is poor ability to remember future intentions, labeled prospective memory skills. It has been demonstrated in several studies that individuals with schizophrenia have impairments in prospective memory that are linked to everyday life skills. However, there have been no studies, to our knowledge, examining the relationship of a clinical measure of prospective memory to medication management skills, a key element of successful adherence. In this Study 41 individuals with schizophrenia and 25 healthy adults were administered a standardized test battery that included measures of prospective memory, medication management skills, neurocognition, and symptoms. Individuals with schizophrenia demonstrated impairments in prospective memory (both time and event-based) relative to healthy controls. Performance on the test of prospective memory was correlated with the standardized measure of medication management in individuals with schizophrenia. Moreover, the test of prospective memory predicted skills in medication adherence even after measures of neurocognition were accounted for. This suggests that prospective memory may play a key role in medication management skills and thus should be a target of cognitive remediation programs.

  13. Nonprice competition and quality of care in managed care: the New York SCHIP market.

    PubMed

    Liu, Hangsheng; Phelps, Charles E

    2008-06-01

    To examine the effect of nonprice competition among managed care plans on the quality of care in the New York SCHIP market. U.S. Census 2000; 2002 New York State Managed Care Plan Performance Report; and 2001 New York State Managed Care Annual Enrollment Report. Each market is defined as a county, and competition is measured as the number of plans in a market. Quality of care is measured in percentages using three Consumer Assessment of Health Plans Survey and three Health Plan Employer Data and Information Set scores. Two-stage least squares is applied to address the endogeneity between competition and the quality of care, using population as an instrument. We find a negative association between competition and quality of care. An additional managed care plan is significantly associated with a decrease of 0.40-2.31 percentage points in four out of six quality measures. After adjusting for production cost, a positive correlation is observed between price and quality measures across different pricing regions. It seems likely that pricing policy is a constraint on quality production, although it may not be interpreted as a causal relationship and further study is needed.

  14. Using organizational and clinical performance data to increase the value of mental health care.

    PubMed

    Schmidt, Eric M; Krahn, Dean D; McGuire, Marsden H; Tavakoli, Sara; Wright, David M; Solares, Hugo E; Lemke, Sonne; Trafton, Jodie

    2017-02-01

    U.S. health systems, policy makers, and patients increasingly demand high-value care that improves health outcomes at lower cost. This study describes the initial design and analysis of the Mental Health Management System (MHMS), a performance data and quality improvement tool used by the Veterans Health Administration (VHA) to increase the value of its mental health care. The MHMS evaluates access to and quality of mental health care, organizational structure and efficiency, implementation of innovative treatment options, and, in collaboration with management, resource needs for delivering care. Performance on 31 measures was calculated for all U.S. VHA facilities (N = 139). Pearson correlations revealed that better access to care was significantly associated with fewer mental health provider staffing vacancies (r = -.24) and higher staff-to-patient ratios for psychiatrists (r = .19) and other outpatient mental health providers (r = .27). Higher staff-to-patient ratios were significantly associated with higher performance on a number of patient and provider satisfaction measures (range of r = .18-.51) and continuity of care measures (range of r = .26-.43). Relationships observed between organizational and clinical performance measures suggest that the MHMS is a robust informatics and quality improvement tool that can serve as a model for health systems planning to adopt a value perspective. Future research should expand the MHMS framework to measure patient and health systems costs and psychosocial outcomes, as well as evaluate whether quality improvement solutions implemented as a result of using organizational information leads to higher-value mental health care. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  15. 76 FR 34745 - Delegation of Authority to the Chief Operating Officer

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... Information Act processing, budgeting, accounting, hiring and training employees, modernizing information... strategic planning, and performance management and measurement. Section B. Authority Excepted The authority...

  16. A model for evaluating the social performance of construction waste management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuan Hongping, E-mail: hpyuan2005@gmail.com

    Highlights: Black-Right-Pointing-Pointer Scant attention is paid to social performance of construction waste management (CWM). Black-Right-Pointing-Pointer We develop a model for assessing the social performance of CWM. Black-Right-Pointing-Pointer With the model, the social performance of CWM can be quantitatively simulated. - Abstract: It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamicsmore » (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects.« less

  17. Applying Tacit Knowledge Management Techniques for Performance Assessment

    ERIC Educational Resources Information Center

    Mitri, Michel

    2003-01-01

    Performance assessment is an important task in all levels of education, both as input for identifying remedial needs of individual students and for improving general quality of education. Although explicit assessment measures can be obtained through objective standardized testing, it is much more difficult to capture fuzzier, or tacit, performance…

  18. Collegiate and Departmental Performance Indicators: The Measures That Matter! AIR 1997 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Moloney, Daniel P.; Grotevant, Susan M.

    In response to changing management and budgetary strategies that have been driving decision making to the lowest administrative levels, institutional researchers have been attempting to identify indicators which can be used to evaluate institutional performance and progress. This paper reviews efforts to introduce departmental operational…

  19. Developing a health care strategy: a results-based approach.

    PubMed

    Sperling, K L

    1995-01-01

    In today's corporate environment, health care managers will be evaluated on performance--and forward-thinking companies are already quantifying their health care success. How this performance is defined and measured will differ from company to company, but shaping the definition and aligning it with the overall business strategy ensures success.

  20. Stress and Performance: Effects of Subjective Work Load and Time Urgency.

    ERIC Educational Resources Information Center

    Friend, Kenneth E.

    1982-01-01

    Measured subjective work load, time urgency, and other stress/motivation variables for management personnel taking a demanding problem-solving exam. Data suggest increases in psychological stresses like subjectively high work load and time urgency uniformly impair performance across the whole range of these variables. (Author)

  1. Getting the Best Out of Your Competencies.

    ERIC Educational Resources Information Center

    Strebler, Marie; And Others

    A study explored practical issues in the use of competencies in performance review and in assessment and measurement of competencies by eight leading British employers at different stages in their use of competencies. The practices of 5 organizations using competencies for performance review of their managers were evaluated through feedback from…

  2. The Balanced Scorecard: A Management System for Wilford Hall Medical Center - The Premier Air Force Medical Enterprise

    DTIC Science & Technology

    1999-04-01

    meanings and functions of human actions. These meanings and functions take the form of qualitative descriptions and explanations ( Denzin , Lincoln 1994...a value-free framework ( Denzin , 1994). Equally important was the learning and educating about performance drivers versus outcome measures. Performance

  3. Toward an Ecological Perspective of Resident Teaching Clinic

    ERIC Educational Resources Information Center

    Smith, C. Scott; Francovich, Chris; Morris, Magdalena; Hill, William; Langlois-Winkle, Francine; Rupper, Randall; Roth, Craig; Wheeler, Stephanie; Vo, Anthony

    2010-01-01

    Teaching clinic managers struggle to convert performance data into meaningful behavioral change in their trainees, and quality improvement measures in medicine have had modest results. This may be due to several factors including clinical performance being based more on team function than individual action, models of best practice that are…

  4. Implementation of a real option in a sustainable supply chain: an empirical study of alkaline battery recycling

    NASA Astrophysics Data System (ADS)

    Cucchiella, Federica; D'Adamo, Idiano; Gastaldi, Massimo; Lenny Koh, S. C.

    2014-06-01

    Green supply chain management (GSCM) has emerged as a key approach for enterprises seeking to become environmentally sustainable. This paper aims to evaluate and describe the advantages of a GSCM approach by analysing practices and performance consequences in the battery recycling sector. It seeks to integrate works in supply chain management (SCM), environmental management, performance management and real option (RO) theory into one framework. In particular, life cycle assessment (LCA) is applied to evaluate the environmental impact of a battery recycling plant project, and life cycle costing (LCC) is applied to evaluate its economic impact. Firms, also understanding the relevance of GSCM, have often avoided applying the green principles because of the elevated costs that such management involved. Such costs could also seem superior to the potential advantages since standard performance measurement systems are internally and business focused; for these reasons, we consider all the possible value deriving also by uncertainty associated to a green project using the RO theory. This work is one of the few and pioneering efforts to investigate GSCM practices in the battery recycling sector.

  5. Successful ingredients in the SMILE study: resident, staff, and management factors influence the effects of humor therapy in residential aged care.

    PubMed

    Brodaty, Henry; Low, Lee-Fay; Liu, Zhixin; Fletcher, Jennifer; Roast, Joel; Goodenough, Belinda; Chenoweth, Lynn

    2014-12-01

    To test the hypothesis that individual and institutional-level factors influence the effects of a humor therapy intervention on aged care residents. Data were from the humor therapy group of the Sydney Multisite Intervention of LaughterBosses and ElderClowns, or SMILE, study, a single-blind cluster randomized controlled trial of humor therapy conducted over 12 weeks; assessments were performed at baseline, week 13, and week 26. One hundred eighty-nine individuals from 17 Sydney residential aged care facilities were randomly allocated to the humor therapy intervention. Professional performers called "ElderClowns" provided 9-12 weekly humor therapy 2-hour sessions, augmented by trained staff, called "LaughterBosses." Outcome measures were as follows: Cornell Scale for Depression in Dementia, Cohen-Mansfield Agitation Inventory, Neuropsychiatric Inventory, the withdrawal subscale of Multidimensional Observation Scale for Elderly Subjects, and proxy-rated quality of life in dementia population scale. Facility-level measures were as follows: support of the management for the intervention, commitment levels of LaughterBosses, Environmental Audit Tool scores, and facility level of care provided (high/low). Resident-level measures were engagement, functional ability, disease severity, and time-in-care. Multilevel path analyses simultaneously modeled resident engagement at the individual level (repeated measures) and the effects of management support and staff commitment to humor therapy at the cluster level. Models indicated flow-on effects, whereby management support had positive effects on LaughterBoss commitment, and LaughterBoss commitment increased resident engagement. Higher resident engagement was associated with reduced depression, agitation, and neuropsychiatric scores. Effectiveness of psychosocial programs in residential aged care can be enhanced by management support, staff commitment, and active resident engagement. Copyright © 2014 American Association for Geriatric Psychiatry. Published by Elsevier Inc. All rights reserved.

  6. From Information Management to Information Visualization

    PubMed Central

    Karami, Mahtab

    2016-01-01

    Summary Objective The development and implementation of a dashboard of medical imaging department (MID) performance indicators. Method Several articles discussing performance measures of imaging departments were searched for this study. All the related measures were extracted. Then, a panel of imaging experts were asked to rate these measures with an open ended question to seek further potential indicators. A second round was performed to confirm the performance rating. The indicators and their ratings were then reviewed by an executive panel. Based on the final panel’s rating, a list of indicators to be used was developed. A team of information technology consultants were asked to determine a set of user interface requirements for the building of the dashboard. In the first round, based on the panel’s rating, a list of main features or requirements to be used was determined. Next, Qlikview was utilized to implement the dashboard to visualize a set of selected KPI metrics. Finally, an evaluation of the dashboard was performed. Results 92 MID indicators were identified. On top of this, 53 main user interface requirements to build of the prototype of dashboard were determined. Then, the project team successfully implemented a prototype of radiology management dashboards into study site. The visual display that was designed was rated highly by users. Conclusion To develop a dashboard, management of information is essential. It is recommended that a quality map be designed for the MID. It can be used to specify the sequence of activities, their related indicators and required data for calculating these indicators. To achieve both an effective dashboard and a comprehensive view of operations, it is necessary to design a data warehouse for gathering data from a variety of systems. Utilizing interoperability standards for exchanging data among different systems can be also effective in this regard. PMID:27437043

  7. The medical communications officer. A resource for data collection, quality management and medical control.

    PubMed

    Gunderson, Michael; Barnard, Jeff; McPherson, John; Kearns, Conrad T

    2002-08-01

    Pinellas County EMS' Medical Communications Officers provide a wide variety of services to patients, field clinicians, managers and their medical director. The concurrent data collection processes used in the MCO program for performance measurement of resuscitation efforts, intubations, submersion incidents and aeromedical transports for trauma cases have been very effective in the integration of data from multiple computer databases and telephone follow-ups with field crews and receiving emergency department staffs. This has facilitated significant improvements in the performance of these and many other aspects of our EMS system.

  8. Evaluating the Effects of Executive Learning and Development on Organisational Performance: Implications for Developing Senior Manager and Executive Capabilities

    ERIC Educational Resources Information Center

    Akrofi, Solomon

    2016-01-01

    In spite of decades of research into high-performance work systems, very few studies have examined the relationship between executive learning and development and organisational performance. In an attempt to close this gap, this study explores the effects of a validated four-dimensional executive learning and development measure on a composite…

  9. Quality measures for the management of hydrocephalus: concepts, simulations, and preliminary field-testing.

    PubMed

    Barton, Spencer E; Campbell, Jeffrey W; Piatt, Joseph H

    2013-04-01

    The authors define and examine the properties of 2 new, practice-based quality measures for the management of hydrocephalus. The Surgical Activity Rate (SAR) is defined as the number of definitive operations for the treatment of hydrocephalus performed in a neurosurgical practice over the course of a year, divided by the number of patients with hydrocephalus seen in follow-up during that year. The Revision Quotient (RQ) is defined as the number of definitive revision operations performed in a neurosurgical practice in the course of a year, divided by the number of definitive initial operations during that year for patients with newly diagnosed hydrocephalus. Using published actuarial shunt survival data, the authors conducted Monte Carlo simulations of a pediatric neurosurgical practice to illustrate the properties and interpretations of the SAR and RQ. They used data from the Kids' Inpatient Database (KID) for 2009 to calculate RQs for hospitals accounting for more than 10 admissions coded for initial CSF shunt insertions. During the initial growth phase of a simulated neurosurgical practice, the SAR approached its steady-state value much earlier than the RQ. Both measures were sensitive to doubling or halving of monthly failure rates. In the 2009 KID, 117 hospitals reported more than 10 initial shunt insertions. The weighted mean (± standard deviation) RQ for these hospitals was 1.79 ± 0.69. Among hospitals performing 50 or more initial shunt insertions, the RQ ranged between 0.71 and 3.65. The SAR and RQ have attractive qualitative features as practice-based quality measures. The RQ, at least, exhibits clinically meaningful interhospital variation as applied to CSF shunt surgery. The SAR and RQ merit prospective field-testing as measures of quality in the management of childhood hydrocephalus.

  10. Strategic planning by independent community pharmacies.

    PubMed

    Harrison, Donald L

    2005-01-01

    (1) To assess the degree and level of use of the strategic planning process (none, partly, fully) by independent community pharmacy owners/managers and (2) to evaluate the relationships between independent community pharmacy owners/managers' level of strategic planning and indicators of pharmacy performance; including new and refill prescriptions filled, gross margin, rated patient care performance, rated dispensing performance, rated non-pharmacy performance, and rated financial performance. Cross-sectional study. United States. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Quality of strategic planning conducted; pharmacy performance measures. Only 141 of 527 (26.8%) usable responses indicated use of some (77 pharmacies, 54.6%) or all (64 pharmacies, 45.4%) of the seven steps typical of strategic planning. Significant associations were observed between the level of strategic planning use and all pharmacy performance variables assessed, including indicators such as greater numbers of new and refill prescriptions dispensed, gross margins, patient care performance, dispensing performance, non-pharmacy performance, and financial performance. Greater ratings of pharmacy performance were significantly associated with the level of strategic planning use. Respondents who fully used strategic planning had significantly higher indicators than partial users; respondents who partly used the process had significantly higher ratings than respondents who did not conduct strategic planning.

  11. Problems in air traffic management. V., Identification and potential aptitude test measures for selection of tower air traffic controller trainees.

    DOT National Transportation Integrated Search

    1965-07-01

    A study of over 200 Terminal Air Traffic Control Specialists indicated that their training performance could be well predicted by a composite of four aptitude tests measuring: numerical ability, non-verbal abstract reasoning, ability to solve simplif...

  12. University Performance Evaluations: What Are We Really Measuring?

    ERIC Educational Resources Information Center

    Bedggood, Rowan E.; Donovan, Jerome D.

    2012-01-01

    Surveying students to garner feedback on teaching and subject quality is a common occurrence in many universities globally. Despite the criticisms surrounding whether measures associated with these surveys are indeed valid, university managers continue to utilise them in key decision making. These surveys mirror business practices where measuring…

  13. The Software Maturity Matrix: A Software Performance Metric

    DTIC Science & Technology

    2003-01-28

    are for Managing n Use Them! n Unused measurements have the same value as last night’s unused hotel room or an empty airline seat. n Be Prepared to...standard measurements are implicit n Organization standard verification is implicit n Organization standard SMM training can be the basis of an

  14. 15 CFR 291.3 - Environmental tools and techniques projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... activity, and “customer satisfaction” measures of performance. (6) Management experience and plans... population must be clearly defined. The proposal must demonstrate that it understands the population's...

  15. Medicaid.gov

    MedlinePlus

    ... Monitoring Review Plans Program Integrity National Correct Coding Initiative Affordable Care Act Program Integrity Provisions Cost Sharing ... to Care Living Well Quality of Care Improvement Initiatives Medicaid Managed Care Performance Measurement Releases & Announcements Enrollment ...

  16. Medicaid Benefits

    MedlinePlus

    ... Monitoring Review Plans Program Integrity National Correct Coding Initiative Affordable Care Act Program Integrity Provisions Cost Sharing ... to Care Living Well Quality of Care Improvement Initiatives Medicaid Managed Care Performance Measurement Releases & Announcements Enrollment ...

  17. Evaluation of the hypertension disease management program in Korea.

    PubMed

    Kim, Younmi; Lee, Kunsei; Shin, Eunyoung; Kim, Hyeongsu; June, Kyung Ja

    2010-07-01

    This study evaluated how the Hypertension Disease Management Program (HDMP) affects patient's blood pressure, knowledge, health behaviors, and use of medical services. Evaluation was performed by 2 measures, which were before and after comparison within the management group (n = 210) and comparison between the management group and control group (n = 1050) in 2005. Systolic and diastolic blood pressure of management group significantly decreased from 137.5 and 86.0 mm Hg to 131.2 and 83.8 mm Hg (P < .001, P < .01), respectively. Dieting, snack control, consumption of low-sodium meals, low-cholesterol meals, and fruits or vegetables, regular checking of blood pressure, and stress management techniques significantly increased after HDMP. However, there was no significant difference in the use of medical service between the disease management group and the control group. This study showed that the HDMP improved lifestyle and reduced blood pressure on the disease management group, but changed neither medical costs nor use of medical services. Long-term evaluation should be performed to determine if the HDMP reduce medical costs and use of medical services.

  18. An examination on the influence of small and medium enterprise (SME) stakeholder on green supply chain management practices

    NASA Astrophysics Data System (ADS)

    Shahlan, M. Z.; Sidek, A. A.; Suffian, S. A.; Hazza, M. H. F. A.; Daud, M. R. C.

    2018-01-01

    In this paper, climate change and global warming are the biggest current issues in the industrial sectors. The green supply chain managements (GSCM) is one of the crucial input to these issues. Effective GSCM can potentially secure the organization’s competitive advantage and improve the environmental performance of the network activities. In this study, the aim is to investigate and examine how a small and medium enterprises (SMEs) stakeholder pressure and top management influence green supply chain management practices. The study is further advance green supply chain management research in Malaysia focusing on SMEs manufacturing sector using structural equation modelling. Structural equation modelling is a multivariate statistical analysis technique used to examine structural relationship. It is the combination of factor analysis and multi regression analysis and used to analyse structural relationship between measure variable and latent factor. This research found that top management support and stakeholder pressure is the major influence for SMEs to adopt green supply chain management. The research also found that top management is fully mediate with the relationship between stakeholder pressure and monitoring supplier environmental performance.

  19. Toward Alternative Metrics for Measuring Performance within Operational Contracting Squadrons: An Application of Benchmarking Techniques

    DTIC Science & Technology

    1993-09-01

    and (6) assistance with special problems by the purchasing department (Cavinato, 1987:10). Szilagyi and Wallace state-that an effective performance...Naval Research, November 1975. Szilagyi , Andrew D. Jr. and Marc J. Wallace , Jr. Organizational Behavior and Performance, Santa Monica CA, Goodyear...evaluation systems will the manager be able to achieve the bottom line--organizational effectiveness ( Szilagyi 1980:457). Benefits of Evaluatin2 Performance

  20. Human factors in safety and business management.

    PubMed

    Vogt, Joachim; Leonhardt, Jorg; Koper, Birgit; Pennig, Stefan

    2010-02-01

    Human factors in safety is concerned with all those factors that influence people and their behaviour in safety-critical situations. In aviation these are, for example, environmental factors in the cockpit, organisational factors such as shift work, human characteristics such as ability and motivation of staff. Careful consideration of human factors is necessary to improve health and safety at work by optimising the interaction of humans with their technical and social (team, supervisor) work environment. This provides considerable benefits for business by increasing efficiency and by preventing incidents/accidents. The aim of this paper is to suggest management tools for this purpose. Management tools such as balanced scorecards (BSC) are widespread instruments and also well known in aviation organisations. Only a few aviation organisations utilise management tools for human factors although they are the most important conditions in the safety management systems of aviation organisations. One reason for this is that human factors are difficult to measure and therefore also difficult to manage. Studies in other domains, such as workplace health promotion, indicate that BSC-based tools are useful for human factor management. Their mission is to develop a set of indicators that are sensitive to organisational performance and help identify driving forces as well as bottlenecks. Another tool presented in this paper is the Human Resources Performance Model (HPM). HPM facilitates the integrative assessment of human factors programmes on the basis of a systematic performance analysis of the whole system. Cause-effect relationships between system elements are defined in process models in a first step and validated empirically in a second step. Thus, a specific representation of the performance processes is developed, which ranges from individual behaviour to system performance. HPM is more analytic than BSC-based tools because HPM also asks why a certain factor is facilitating or obstructing success. A significant need for research and development is seen here because human factors are of increasing importance for organisational success. This paper suggests integrating human factors in safety management of aviation businesses - a top-ranking partner of technology and finance - and managing it with professional tools. The tools HPM and BSC were identified as potentially useful for this purpose. They were successfully applied in case studies briefly presented in this paper. In terms of specific safety-steering tools in the aviation industry, further elaboration and empirical study is crucial. Statement of Relevance: The importance of human factors is recognised by operators at the sharp end of aviation, where flights are conducted or coordinated. At the blunt end, measurement tools are needed to manage operational resources.

  1. Clinical performance improvement series. Classic CQI integrated with comprehensive disease management as a model for performance improvement.

    PubMed

    Joshi, M S; Bernard, D B

    1999-08-01

    In recent years, health and disease management has emerged as an effective means of delivering, integrating, and improving care through a population-based approach. Since 1997 the University of Pennsylvania Health System (UPHS) has utilized the key principles and components of continuous quality improvement (CQI) and disease management to form a model for health care improvement that focuses on designing best practices, using best practices to influence clinical decision making, changing processes and systems to deploy and deliver best practices, and measuring outcomes to improve the process. Experience with 28 programs and more than 14,000 patients indicates significant improvement in outcomes, including high physician satisfaction, increased patient satisfaction, reduced costs, and improved clinical process and outcome measures across multiple diseases. DIABETES DISEASE MANAGEMENT: In three months a UPHS multidisciplinary diabetes disease management team developed a best practice approach for the treatment of all patients with diabetes in the UPHS. After the program was pilot tested in three primary care physician sites, it was then introduced progressively to additional practice sites throughout the health system. The establishment of the role of the diabetes nurse care managers (certified diabetes educators) was central to successful program deployment. Office-based coordinators ensure incorporation of the best practice protocols into routine flow processes. A disease management intranet disseminates programs electronically. Outcomes of the UPHS health and disease management programs so far demonstrate success across multiple dimensions of performance-service, clinical quality, access, and value. The task of health care leadership today is to remove barriers and enable effective implementation of key strategies, such as health and disease management. Substantial effort and resources must be dedicated to gain physician buy-in and achieve compliance. The challenge is to provide leadership support, to reward and recognize best practice performers, and to emphasize the use of data for feedback and improvement. As these processes are implemented successfully, and evidence of improved outcomes is documented, it is likely that this approach will be more widely embraced and that organizationwide performance improvement will increase significantly. Health care has traditionally invested extraordinary resources in developing best practice approaches, including guidelines, education programs, or other tangible products and services. Comparatively little time, effort, and resources have been targeted to implementation and use, the stage at which most efforts fail. CQI's emphasis on data, rapid diffusion of innovative programs, and rapid cycle improvements enhance the implementation and effectiveness of disease management.

  2. Combining control measures for more effective management of fisheries under uncertainty: quotas, effort limitation and protected areas.

    PubMed

    Stefansson, Gunnar; Rosenberg, Andrew A

    2005-01-29

    We consider combinations of three types of control measures for the management of fisheries when the input information for policy decisions is uncertain. The methods considered include effort controls, catch quotas and area closures. We simulated a hypothetical fishery loosely based on the Icelandic cod fishery, using a simple spatially explicit dynamic model. We compared the performance with respect to conserving the resource and economic return for each type of control measure alone and in combination. In general, combining more than one type of primary direct control on fishing provides a greater buffer to uncertainty than any single form of fishery control alone. Combining catch quota control with a large closed area is a most effective system for reducing the risk of stock collapse and maintaining both short and long-term economic performance. Effort controls can also be improved by adding closed areas to the management scheme. We recommend that multiple control methods be used wherever possible and that closed areas should be used to buffer uncertainty. To be effective, these closed areas must be large and exclude all principal gears to provide real protection from fishing mortality.

  3. Creating meaningful business continuity management programme metrics.

    PubMed

    Strong, Brian

    2010-11-01

    The popular axiom, 'what gets measured gets done', is often applied in the quality management and continuous improvement disciplines. This truism is also useful to business continuity practitioners as they continually strive to prove the value of their organisation's investment in a business continuity management (BCM) programme. BCM practitioners must also remain relevant to their organisations as executives focus on the bottom line and maintaining stakeholder confidence. It seems that executives always find a way, whether in a hallway or elevator, to ask BCM professionals about the company's level of readiness. When asked, they must be ready with an informed response. The establishment of a process to measure business continuity programme performance and organisational readiness has emerged as a key component of US Department of Homeland Security 'Voluntary Private Sector Preparedness (PS-Prep) Program' standards where the overarching goal is to improve private sector preparedness for disasters and emergencies. The purpose of this paper is two-fold: to introduce continuity professionals to best practices that should be considered when developing a BCM metrics programme as well as providing a case study of how a large health insurance company researched, developed and implemented a process to measure BCM programme performance and company readiness.

  4. Combining control measures for more effective management of fisheries under uncertainty: quotas, effort limitation and protected areas

    PubMed Central

    Stefansson, Gunnar; Rosenberg, Andrew A.

    2005-01-01

    We consider combinations of three types of control measures for the management of fisheries when the input information for policy decisions is uncertain. The methods considered include effort controls, catch quotas and area closures. We simulated a hypothetical fishery loosely based on the Icelandic cod fishery, using a simple spatially explicit dynamic model. We compared the performance with respect to conserving the resource and economic return for each type of control measure alone and in combination. In general, combining more than one type of primary direct control on fishing provides a greater buffer to uncertainty than any single form of fishery control alone. Combining catch quota control with a large closed area is a most effective system for reducing the risk of stock collapse and maintaining both short and long-term economic performance. Effort controls can also be improved by adding closed areas to the management scheme. We recommend that multiple control methods be used wherever possible and that closed areas should be used to buffer uncertainty. To be effective, these closed areas must be large and exclude all principal gears to provide real protection from fishing mortality. PMID:15713593

  5. Perceptions of Heat Risk to Health: A Qualitative Study of Professional Bus Drivers and Their Managers in Jinan, China

    PubMed Central

    Zhou, Lin; Xin, Zheng; Bai, Li; Wan, Fangjun; Wang, Yongming; Sang, Shaowei; Liu, Shouqin; Zhang, Ji; Liu, Qiyong

    2014-01-01

    Summer extreme heat threatens the health of individuals, especially persons who are involved in outdoor activities. Ensuring the normal function of a city, bus drivers are among those who participate in outdoor physical activities and are exposed to excessive heat in hot summer weather. This qualitative study was performed to explore professional bus drivers’ in-depth views of extreme heat risks to their health, and ultimately develop targeted advice and policy interventions for city bus drivers. An interview-based study was performed among professional bus drivers in Jinan, China, including four focus groups with professional bus drivers (n = 37) and three interviews with their managers (n = 14). Five central themes or categories from the bus driver interviews were found: concerns about summer heat; health effects related to extreme heat; adaptive measures; barriers in implementing these adaptive measures; and suggested interventions. The beneficial role of cooling facilities (particularly air-conditioning) during extreme heat are addressed. The barriers not only impede the implementation of behavioral adaptive measures but also enhance the negative attitudes of bus drivers towards their effectiveness. The responsibilities of managers in promoting preventive actions are addressed. PMID:24477213

  6. The role of pouch compliance measurement in the management of pouch dysfunction.

    PubMed

    Maeda, Yasuko; Molina, María Elena; Norton, Christine; McLaughlin, Simon D; Vaizey, Carolynne J; Laurberg, Søren; Clark, Susan K

    2010-04-01

    Ileal pouch anal anastomosis is an established option for patients who require total proctocolectomy and restoration of bowel continuity. However, the functional results are not always good and low pouch compliance has been suggested as one possible cause. We aimed to review the results of pouch compliance tests over 11 years to assess whether measuring pouch compliance is a useful diagnostic tool to guide management of pouch dysfunction. The results of pouch compliance tests performed between 1996 and 2007 together with the details of symptoms, treatments and outcome were reviewed. One hundred and forty-one pouch compliance tests were performed. There was no difference in pouch compliance between those with overt pathology (pouchitis, pelvic sepsis or anastomotic stricture) and those with idiopathic pouch dysfunction. In this second group, there was no difference in pouch compliance between patients with and without each of the symptoms of increased defaecatory frequency, incontinence and evacuation difficulties. The results of the compliance testing did not influence the clinical decision making on idiopathic pouch dysfunction (p=0.77) nor diverted pouches (p=0.07). Measuring pouch compliance does not offer new information accounting for idiopathic pouch dysfunction and has little influence on the clinical management.

  7. Effects of a One-to-One Fatigue Management Course for People With Chronic Conditions and Fatigue.

    PubMed

    Van Heest, Katy N L; Mogush, Ashley R; Mathiowetz, Virgil G

    We assessed the impact of a one-to-one fatigue management course on participants' fatigue, self-efficacy, quality of life, and energy conservation behaviors. This observational study used a one-group, pretest-posttest, follow-up design. Forty-nine people with chronic conditions and fatigue participated in the one-to-one fatigue management course in outpatient and community-based settings. The Functional Assessment of Chronic Illness Therapy-Fatigue Scale was used to measure fatigue; the Functional Assessment of Cancer Therapy-General measured quality of life; and the Self-Efficacy for Performing Energy Conservation Strategies Assessment was used to measure self-efficacy. Participants showed significant reductions in fatigue and significant increases in self-efficacy and quality of life at posttest. These beneficial effects were maintained at follow-up. The Social Well-Being subscale was the only measure on which outcomes did not change significantly. The one-to-one fatigue management course is a beneficial intervention for people with chronic conditions and fatigue. Copyright © 2017 by the American Occupational Therapy Association, Inc.

  8. Surface knowledge and risks to landing and roving - The scale problem

    NASA Technical Reports Server (NTRS)

    Bourke, Roger D.

    1991-01-01

    The role of surface information in the performance of surface exploration missions is discussed. Accurate surface models based on direct measurements or inference are considered to be an important component in mission risk management. These models can be obtained using high resolution orbital photography or a combination of laser profiling, thermal inertia measurements, and/or radar. It is concluded that strategies for Martian exploration should use high confidence models to achieve maximum performance and low risk.

  9. Quality indicators for the detection and management of chronic kidney disease in primary care in Canada derived from a modified Delphi panel approach.

    PubMed

    Tu, Karen; Bevan, Lindsay; Hunter, Katie; Rogers, Jess; Young, Jacqueline; Nesrallah, Gihad

    2017-01-01

    The detection and management of chronic kidney disease lies within primary care; however, performance measures applicable in the Canadian context are lacking. We sought to develop a set of primary care quality indicators for chronic kidney disease in the Canadian setting and to assess the current state of the disease's detection and management in primary care. We used a modified Delphi panel approach, involving 20 panel members from across Canada (10 family physicians, 7 nephrologists, 1 patient, 1 primary care nurse and 1 pharmacist). Indicators identified from peer-reviewed and grey literature sources were subjected to 3 rounds of voting to develop a set of quality indicators for the detection and management of chronic kidney disease in the primary care setting. The final indicators were applied to primary care electronic medical records in the Electronic Medical Record Administrative data Linked Database (EMRALD) to assess the current state of primary care detection and management of chronic kidney disease in Ontario. Seventeen indicators made up the final list, with 1 under the category Prevalence, Incidence and Mortality; 4 under Screening, Diagnosis and Risk Factors; 11 under Management; and 1 under Referral to a Specialist. In a sample of 139 993 adult patients not on dialysis, 6848 (4.9%) had stage 3 or higher chronic kidney disease, with the average age of patients being 76.1 years (standard deviation [SD] 11.0); 62.9% of patients were female. Diagnosis and screening for chronic kidney disease were poorly performed. Only 27.1% of patients with stage 3 or higher disease had their diagnosis documented in their cumulative patient profile. Albumin-creatinine ratio testing was only performed for 16.3% of patients with a low estimated glomerular filtration rate (eGFR) and for 28.5% of patients with risk factors for chronic kidney disease. Family physicians performed relatively better with the management of chronic kidney disease, with 90.4% of patients with stage 3 or higher disease having an eGFR performed in the previous 18 months and 83.1% having a blood pressure recorded in the previous 9 months. We propose a set of measurable indicators to evaluate the quality of the management of chronic kidney disease in primary care. These indicators may be used to identify opportunities to improve current practice in Canada.

  10. A controllable sensor management algorithm capable of learning

    NASA Astrophysics Data System (ADS)

    Osadciw, Lisa A.; Veeramacheneni, Kalyan K.

    2005-03-01

    Sensor management technology progress is challenged by the geographic space it spans, the heterogeneity of the sensors, and the real-time timeframes within which plans controlling the assets are executed. This paper presents a new sensor management paradigm and demonstrates its application in a sensor management algorithm designed for a biometric access control system. This approach consists of an artificial intelligence (AI) algorithm focused on uncertainty measures, which makes the high level decisions to reduce uncertainties and interfaces with the user, integrated cohesively with a bottom up evolutionary algorithm, which optimizes the sensor network"s operation as determined by the AI algorithm. The sensor management algorithm presented is composed of a Bayesian network, the AI algorithm component, and a swarm optimization algorithm, the evolutionary algorithm. Thus, the algorithm can change its own performance goals in real-time and will modify its own decisions based on observed measures within the sensor network. The definition of the measures as well as the Bayesian network determine the robustness of the algorithm and its utility in reacting dynamically to changes in the global system.

  11. A model for evaluating the social performance of construction waste management.

    PubMed

    Yuan, Hongping

    2012-06-01

    It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamics (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. Does dual task training improve walking performance of older adults with concern of falling?

    PubMed

    Wollesen, B; Schulz, S; Seydell, L; Delbaere, K

    2017-09-11

    Older adults with concerns of falling show decrements of gait stability under single (ST) and dual task (DT) conditions. To compare the effects of a DT training integrating task managing strategies for independent living older adults with and without concern about falling (CoF) to a non-training control group on walking performance under ST and DT conditions. Single center parallel group single blind randomized controlled trial with group-based interventions (DT-managing balance training) compared to a control group (Ninety-five independent living older adults; 71.5 ± 5.2 years). A progressive DT training (12 sessions; 60 min each; 12 weeks) including task-managing strategies was compared to a non-training control group. group based intervention for independent living elderly in a gym. ST and DT walking (visual verbal Stroop task) were measured on a treadmill. Gait parameters (step length, step width, and gait line) and cognitive performance while walking were compared with a 2x2x2 Repeated Measures Analyses of Variance. Participants in the intervention group showed an increased step length under ST and DT conditions following the intervention, for both people with and without CoF compared to their respective control groups. Foot rolling movement and cognitive performance while walking however only improved in participants without CoF. The results showed that DT managing training can improve walking performance under ST and DT conditions in people with and without CoF. Additional treatment to directly address CoF, such as cognitive behavioural therapy, should be considered to further improve the cautious gait pattern (as evidenced by reduced foot rolling movements). The study was retrospectively registered in the German Clinical Trials Register (DRKS; Identification number DRKS00012382 , 11.05.2017).

  13. Managing the deteriorating patient in a simulated environment: nursing students' knowledge, skill and situation awareness.

    PubMed

    Cooper, Simon; Kinsman, Leigh; Buykx, Penny; McConnell-Henry, Tracy; Endacott, Ruth; Scholes, Julie

    2010-08-01

    To examine, in a simulated environment, the ability of final-year nursing students to assess, identify and respond to patients either deteriorating or at risk of deterioration. The early identification and management of patient deterioration has a major impact on patient outcomes. 'Failure to rescue' is of international concern, with significant concerns over nurses' ability to detect deterioration, the reasons for which are unknown. Mixed methods incorporating quantitative measures of performance (knowledge, skill and situation awareness) and, to be reported at a later date, a qualitative reflective review of decision processes. Fifty-one final-year, final-semester student nurses attended a simulation laboratory. Students completed a knowledge questionnaire and two video-recorded simulated scenarios (mannequin based) to assess skill performance. The scenarios simulated deteriorating patients with hypovolaemic and septic shock. Situation awareness was measured by randomly stopping each scenario and asking a series of questions relating to the situation. The mean knowledge score was 74% (range 46-100%) and the mean skill performance score across both scenarios was 60% (range 30-78%). Skill performance improved significantly (p < 0.01) by the second scenario. However, skill performance declined significantly in both scenarios as the patient's condition deteriorated (hypovolaemia scenario: p = 0.012, septic scenario: p = 0.000). The mean situation awareness score across both scenarios was 59% (range 38-82%). Participants tended to identify physiological indicators of deterioration (77%) but had low comprehension scores (44%). Knowledge scores suggest, on average, a satisfactory academic preparation, but this study identified significant deficits in students' ability to manage patient deterioration. This study suggests that student nurses, at the point of qualification, may be inadequately prepared to identify and manage deteriorating patients in the clinical setting.

  14. Surviving annual performance reviews.

    PubMed

    Lazarus, Arthur

    2008-01-01

    Physicians who work in organizational settings can expect to be evaluated at least twice a year. Yet physicians are accustomed to functioning autonomously, and they may resist having their performance measured or become anxious at the thought of it. Several recommendations are made to help physicians survive the ordeal: (1) establish measurable goals and objectives for the year; (2) perform at your very best at all times; (3) obtain feedback about your performance from your colleagues; (4) ask for a mentor if you lack experience; (5) learn to manage upward; (6) let your boss know when other people have praised your work; (7) insist on face-to-face evaluations; and (8) sign your annual performance review and indicate agreement or disagreement.

  15. Payment models to support population health management.

    PubMed

    Huerta, Timothy R; Hefner, Jennifer L; McAlearney, Ann Scheck

    2014-01-01

    To survey the policy-driven financial controls currently being used to drive physician change in the care of populations. This paper offers a review of current health care payment models and discusses the impact of each on the potential success of PHM initiatives. We present the benefits of a multi-part model, combining visit-based fee-for-service reimbursement with a monthly "care coordination payment" and a performance-based payment system. A multi-part model removes volume-based incentives and promotes efficiency. However, it is predicated on a pay-for-performance framework that requires standardized measurement. Application of this model is limited due to the current lack of standardized measurement of quality goals that are linked to payment incentives. Financial models dictated by health system payers are inextricably linked to the organization and management of health care. There is a need for better measurements and realistic targets as part of a comprehensive system of measurement assessment that focuses on practice redesign, with the goal of standardizing measurement of the structure and process of redesign. Payment reform is a necessary component of an accurate measure of the associations between practice transformation and outcomes important to both patients and society.

  16. Electric Motor Thermal Management R&D. Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennion, Kevin

    With the push to reduce component volumes, lower costs, and reduce weight without sacrificing performance or reliability, the challenges associated with thermal management increase for power electronics and electric motors. Thermal management for electric motors will become more important as the automotive industry continues the transition to more electrically dominant vehicle propulsion systems. The transition to more electrically dominant propulsion systems leads to higher-power duty cycles for electric drive systems. Thermal constraints place significant limitations on how electric motors ultimately perform, and as thermal management improves, there will be a direct trade-off between motor performance, efficiency, cost, and the sizingmore » of electric motors to operate within the thermal constraints. The goal of this research project is to support broad industry demand for data, analysis methods, and experimental techniques to improve and better understand motor thermal management. Work in FY15 focused on two areas related to motor thermal management: passive thermal performance and active convective cooling. Passive thermal performance emphasized the thermal impact of materials and thermal interfaces among materials within an assembled motor. The research tasks supported the publication of test methods and data for thermal contact resistances and direction-dependent thermal conductivity within an electric motor. Active convective cooling focused on measuring convective heat-transfer coefficients using automatic transmission fluid (ATF). Data for average convective heat transfer coefficients for direct impingement of ATF jets was published. Also, experimental hardware for mapping local-scale and stator-scale convective heat transfer coefficients for ATF jet impingement were developed.« less

  17. A strategic management model for evaluation of health, safety and environmental performance.

    PubMed

    Abbaspour, Majid; Toutounchian, Solmaz; Roayaei, Emad; Nassiri, Parvin

    2012-05-01

    Strategic health, safety, and environmental management system (HSE-MS) involves systematic and cooperative planning in each phase of the lifecycle of a project to ensure that interaction among the industry group, client, contractor, stakeholder, and host community exists with the highest level of health, safety, and environmental standard performances. Therefore, it seems necessary to assess the HSE-MS performance of contractor(s) by a comparative strategic management model with the aim of continuous improvement. The present Strategic Management Model (SMM) has been illustrated by a case study and the results show that the model is a suitable management tool for decision making in a contract environment, especially in oil and gas fields and based on accepted international standards within the framework of management deming cycle. To develop this model, a data bank has been created, which includes the statistical data calculated by converting the HSE performance qualitative data into quantitative values. Based on this fact, the structure of the model has been formed by defining HSE performance indicators according to the HSE-MS model. Therefore, 178 indicators have been selected which have been grouped into four attributes. Model output provides quantitative measures of HSE-MS performance as a percentage of an ideal level with maximum possible score for each attribute. Defining the strengths and weaknesses of the contractor(s) is another capability of this model. On the other hand, this model provides a ranking that could be used as the basis for decision making at the contractors' pre-qualification phase or during the execution of the project.

  18. Reach and Validity of an Objective Medication Adherence Measure Among Safety Net Health Plan Members with Diabetes: A Cross-Sectional Study.

    PubMed

    Ratanawongsa, Neda; Karter, Andrew J; Quan, Judy; Parker, Melissa M; Handley, Margaret; Sarkar, Urmimala; Schmittdiel, Julie A; Schillinger, Dean

    2015-08-01

    With the expansion of Medicaid and low-cost health insurance plans among diverse patient populations, objective measures of medication adherence using pharmacy claims could advance clinical care and translational research for safety net care. However, safety net patients may experience fluctuating prescription drug coverage, affecting the performance of adherence measures. To evaluate the performance of continuous medication gap (CMG) for diverse, low-income managed care members with diabetes. We conducted this cross-sectional analysis using administrative and clinical data for 680 members eligible for a self-management support trial at a nonprofit, government-sponsored managed care plan. We applied CMG methodology to cardiometabolic medication claims for English- , Cantonese- , or Spanish-speaking members with diabetes. We examined inclusiveness (the proportion with calculable CMG) and selectivity (sociodemographic and medical differences from members without CMG). For validity, we examined unadjusted associations of suboptimal adherence (CMG >  20%) with suboptimal cardiometabolic control. 429 members (63%) had calculable CMG. Compared with members without CMG, members with CMG were younger, more likely employed, and had poorer glycemic control but had better blood pressure and lipid control. Suboptimal adherence occurred more frequently among members with poor cardiometabolic control than among members with optimal control (28% vs. 12%, P = 0.02). CMG demonstrated acceptable inclusiveness and validity in a diverse, low-income safety net population, comparable with its performance in studies among other insured populations. CMG may provide a useful tool to measure adherence among increasingly diverse Medicaid populations, complemented by other strategies to reach those not captured by CMG.

  19. Correlation between safety climate and contractor safety assessment programs in construction.

    PubMed

    Sparer, Emily H; Murphy, Lauren A; Taylor, Kathryn M; Dennerlein, Jack T

    2013-12-01

    Contractor safety assessment programs (CSAPs) measure safety performance by integrating multiple data sources together; however, the relationship between these measures of safety performance and safety climate within the construction industry is unknown. Four hundred and one construction workers employed by 68 companies on 26 sites and 11 safety managers employed by 11 companies completed brief surveys containing a nine-item safety climate scale developed for the construction industry. CSAP scores from ConstructSecure, Inc., an online CSAP database, classified these 68 companies as high or low scorers, with the median score of the sample population as the threshold. Spearman rank correlations evaluated the association between the CSAP score and the safety climate score at the individual level, as well as with various grouping methodologies. In addition, Spearman correlations evaluated the comparison between manager-assessed safety climate and worker-assessed safety climate. There were no statistically significant differences between safety climate scores reported by workers in the high and low CSAP groups. There were, at best, weak correlations between workers' safety climate scores and the company CSAP scores, with marginal statistical significance with two groupings of the data. There were also no significant differences between the manager-assessed safety climate and the worker-assessed safety climate scores. A CSAP safety performance score does not appear to capture safety climate, as measured in this study. The nature of safety climate in construction is complex, which may be reflective of the challenges in measuring safety climate within this industry. Am. J. Ind. Med. 56:1463-1472, 2013. © 2013 Wiley Periodicals, Inc. © 2013 Wiley Periodicals, Inc.

  20. Measuring Performance Of Salaried Salespeople

    ERIC Educational Resources Information Center

    Riola, Peter W.

    1974-01-01

    A Sales By Objectives (SBO) program offers the sales manager results by using the resources around him--his sales personnel--to set their own personal, routine, problem solving, and innovative goals. (MW)

  1. Surveying perceptions of landslide risk management in Norway

    NASA Astrophysics Data System (ADS)

    Chiu, Jessica Ka Yi; Eidsvig, Unni

    2016-04-01

    Enhanced precipitation due to climate change leads to increase in both frequency and intensity of landslides in Norway. A proactive approach to risk management is therefore required to significantly reduce the losses associated with landslides. Opinions and perceptions from practitioners on the performance of landslide risk management can provide insights on areas for improvement in the landslide risk management strategies in Norway. The Risk Management Index (RMI), proposed by Cardona et al. (2004), is a well-established method to measure perceptions of disaster management of selected actors holistically. The RMI is measured based on opinion questionnaires to technical staff, decision-makers, and stakeholders involved in all stages of risk reduction strategies. It is a composite index that considers a wide variety of strategies to manage risks, including structural and non-structural measures, acceptance strategies, disaster management, and risk transfer. The RMI method was modified to be implemented in landslide hazards and to fit with Norwegian conditions. An opinion survey was conducted in autumn 2015 to measure perceptions of landslide risk management in Norway. Perceptions were surveyed for two time periods: 2015 and 2050, and are based on national, county, and municipality levels. Based on the survey results, performance of landslide risk management at any administrative levels in Norway is perceived to improve from `significant' in 2015 to `significant' to `outstanding' in 2050. Knowledge and technology, climate, risk perceptions, and anthropogenic activities are mostly considered by respondents for their 2050 perceptions. Several aspects of landslide risk management in Norway can be improved. For example, landslide hazard evaluation and mapping should be prioritised in Norway. Upgrading, retrofitting, and reconstruction of assets may also be included in the landslide risk reduction strategies. In addition, there should be more focus on inter-institutional organisation as well as allocation and use of financial resources for dealing with landslides at local levels. Although the survey was considered too difficult by some of the respondents, it can be regarded as a starting point to develop a common terminology/language in landslide risk management in Norway that allows mutual understandings among people with different backgrounds. The approach of surveying perceptions of landslide risk management can also be expanded to the public to enable comparisons of perceptions between experts and the public. Furthermore, the methodology can be applied to other types of natural hazards in Norway, such as floods. This project is supported by Klima2050 (http://www.klima2050.no/).

  2. Army Hearing Program Status Report Quarter 3 Fiscal Year 2017

    DTIC Science & Technology

    2017-09-14

    chapter. This provides a vehicle for the collection of Measures of Performance and Measures of Effectiveness (MOE) in order to report the metrics as...Program representatives and managers to visit and inspect these areas regularly for noise exposure and proper protective measures . As evidenced by the...welcome measure to report. RECOMMENDATIONS • Increase participation in the survey as directed by Chief of Staff, U.S. Army Medical Command (MEDCOM

  3. Challenges in performance of food safety management systems: a case of fish processing companies in Tanzania.

    PubMed

    Kussaga, Jamal B; Luning, Pieternel A; Tiisekwa, Bendantunguka P M; Jacxsens, Liesbeth

    2014-04-01

    This study provides insight for food safety (FS) performance in light of the current performance of core FS management system (FSMS) activities and context riskiness of these systems to identify the opportunities for improvement of the FSMS. A FSMS diagnostic instrument was applied to assess the performance levels of FSMS activities regarding context riskiness and FS performance in 14 fish processing companies in Tanzania. Two clusters (cluster I and II) with average FSMS (level 2) operating under moderate-risk context (score 2) were identified. Overall, cluster I had better (score 3) FS performance than cluster II (score 2 to 3). However, a majority of the fish companies need further improvement of their FSMS and reduction of context riskiness to assure good FS performance. The FSMS activity levels could be improved through hygienic design of equipment and facilities, strict raw material control, proper follow-up of critical control point analysis, developing specific sanitation procedures and company-specific sampling design and measuring plans, independent validation of preventive measures, and establishing comprehensive documentation and record-keeping systems. The risk level of the context could be reduced through automation of production processes (such as filleting, packaging, and sanitation) to restrict people's interference, recruitment of permanent high-skilled technological staff, and setting requirements on product use (storage and distribution conditions) on customers. However, such intervention measures for improvement could be taken in phases, starting with less expensive ones (such as sanitation procedures) that can be implemented in the short term to more expensive interventions (setting up assurance activities) to be adopted in the long term. These measures are essential for fish processing companies to move toward FSMS that are more effective.

  4. Evaluating building performance in healthcare facilities: an organizational perspective.

    PubMed

    Steinke, Claudia; Webster, Lynn; Fontaine, Marie

    2010-01-01

    Using the environment as a strategic tool is one of the most cost-effective and enduring approaches for improving public health; however, it is one that requires multiple perspectives. The purpose of this article is to highlight an innovative methodology that has been developed for conducting comprehensive performance evaluations in public sector health facilities in Canada. The building performance evaluation methodology described in this paper is a government initiative. The project team developed a comprehensive building evaluation process for all new capital health projects that would respond to the aforementioned need for stakeholders to be more accountable and to better integrate the larger organizational strategy of facilities. The Balanced Scorecard, which is a multiparadigmatic, performance-based business framework, serves as the underlying theoretical framework for this initiative. It was applied in the development of the conceptual model entitled the Building Performance Evaluation Scorecard, which provides the following benefits: (1) It illustrates a process to link facilities more effectively to the overall mission and goals of an organization; (2) It is both a measurement and a management system that has the ability to link regional facilities to measures of success and larger business goals; (3) It provides a standardized methodology that ensures consistency in assessing building performance; and (4) It is more comprehensive than traditional building evaluations. The methodology presented in this paper is both a measurement and management system that integrates the principles of evidence-based design with the practices of pre- and post-occupancy evaluation. It promotes accountability and continues throughout the life cycle of a project. The advantage of applying this framework is that it engages health organizations in clarifying a vision and strategy for their facilities and helps translate those strategies into action and measurable performance outcomes.

  5. Comparing health system performance assessment and management approaches in the Netherlands and Ontario, Canada

    PubMed Central

    Tawfik-Shukor, Ali R; Klazinga, Niek S; Arah, Onyebuchi A

    2007-01-01

    Background Given the proliferation and the growing complexity of performance measurement initiatives in many health systems, the Netherlands and Ontario, Canada expressed interests in cross-national comparisons in an effort to promote knowledge transfer and best practise. To support this cross-national learning, a study was undertaken to compare health system performance approaches in The Netherlands with Ontario, Canada. Methods We explored the performance assessment framework and system of each constituency, the embeddedness of performance data in management and policy processes, and the interrelationships between the frameworks. Methods used included analysing governmental strategic planning and policy documents, literature and internet searches, comparative descriptive tables, and schematics. Data collection and analysis took place in Ontario and The Netherlands. A workshop to validate and discuss the findings was conducted in Toronto, adding important insights to the study. Results Both Ontario and The Netherlands conceive health system performance within supportive frameworks. However they differ in their assessment approaches. Ontario's Scorecard links performance measurement with strategy, aimed at health system integration. The Dutch Health Care Performance Report (Zorgbalans) does not explicitly link performance with strategy, and focuses on the technical quality of healthcare by measuring dimensions of quality, access, and cost against healthcare needs. A backbone 'five diamond' framework maps both frameworks and articulates the interrelations and overlap between their goals, themes, dimensions and indicators. The workshop yielded more contextual insights and further validated the comparative values of each constituency's performance assessment system. Conclusion To compare the health system performance approaches between The Netherlands and Ontario, Canada, several important conceptual and contextual issues must be addressed, before even attempting any future content comparisons and benchmarking. Such issues would lend relevant interpretational credibility to international comparative assessments of the two health systems. PMID:17319947

  6. Chapter 24: Strategic Energy Management (SEM) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stewart, James

    Strategic energy management (SEM) focuses on achieving energy-efficiency improvements through systematic and planned changes in facility operations, maintenance, and behaviors (OM&B) and capital equipment upgrades in large energy-using facilities, including industrial buildings, commercial buildings, and multi-facility organizations such as campuses or communities. Facilities can institute a spectrum of SEM actions, ranging from a simple process for regularly identifying energy-savings actions, to establishing a formal, third-party recognized or certified SEM framework for continuous improvement of energy performance. In general, SEM programs that would be considered part of a utility program will contain a set of energy-reducing goals, principles, and practices emphasizingmore » continuous improvements in energy performance or savings through energy management and an energy management system (EnMS).« less

  7. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    NASA Astrophysics Data System (ADS)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  8. Heat and Moisture transport of socks

    NASA Astrophysics Data System (ADS)

    Komárková, P.; Glombíková, V.; Havelka, A.

    2017-10-01

    Investigating the liquid moisture transport and thermal properties is essential for understanding physiological comfort of clothes. This study reports on an experimental investigation of moisture management transport and thermal transport on the physiological comfort of commercially available socks. There are subjective evaluation and objective measurements. Subjective evaluation of the physiological comfort of socks is based on individual sensory perception of probands during and after physical exertion. Objective measurements were performed according to standardized methods using Moisture Management tester for measuring the humidity parameters and C-term TCi analyzer for thermal conductivity and thermal effusivity. The obtained values of liquid moisture transport and thermal properties were related to the material composition and structure of the tested socks. In summary, these results show that objective measurement corresponds with probands feelings.

  9. Astronomical Instrumentation Systems Quality Management Planning: AISQMP (Abstract)

    NASA Astrophysics Data System (ADS)

    Goldbaum, J.

    2017-12-01

    (Abstract only) The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  10. Alternative Fuel Vehicles: How Do They Really Measure Up?

    Science.gov Websites

    performance? The National Renewable Energy Laboratory (NREL) asked that question in a 1996 nationwide survey Fleet Managers Survey presents the results of the survey, conducted by Dwights Energydata for NREL with funding from the U.S. Department of Energy (DOE). The survey was sent to 273 fleet managers with a total

  11. Computer-Aided Air-Traffic Control In The Terminal Area

    NASA Technical Reports Server (NTRS)

    Erzberger, Heinz

    1995-01-01

    Developmental computer-aided system for automated management and control of arrival traffic at large airport includes three integrated subsystems. One subsystem, called Traffic Management Advisor, another subsystem, called Descent Advisor, and third subsystem, called Final Approach Spacing Tool. Data base that includes current wind measurements and mathematical models of performances of types of aircraft contributes to effective operation of system.

  12. NCCDS configuration management process improvement

    NASA Technical Reports Server (NTRS)

    Shay, Kathy

    1993-01-01

    By concentrating on defining and improving specific Configuration Management (CM) functions, processes, procedures, personnel selection/development, and tools, internal and external customers received improved CM services. Job performance within the section increased in both satisfaction and output. Participation in achieving major improvements has led to the delivery of consistent quality CM products as well as significant decreases in every measured CM metrics category.

  13. Transforming revenue management.

    PubMed

    Silveria, Richard; Alliegro, Debra; Nudd, Steven

    2008-11-01

    Healthcare organizations that want to undertake a patient administrative/revenue management transformation should: Define the vision with underlying business objectives and key performance measures. Strategically partner with key vendors for business process development and technology design. Create a program organization and governance infrastructure. Develop a corporate design model that defines the standards for operationalizing the vision. Execute the vision through technology deployment and corporate design model implementation.

  14. The Digital Drag and Drop Pillbox: Design and Feasibility of a Skill-based Education Model to Improve Medication Management.

    PubMed

    Granger, Bradi B; Locke, Susan C; Bowers, Margaret; Sawyer, Tenita; Shang, Howard; Abernethy, Amy P; Bloomfield, Richard A; Gilliss, Catherine L

    We present the design and feasibility testing for the "Digital Drag and Drop Pillbox" (D-3 Pillbox), a skill-based educational approach that engages patients and providers, measures performance, and generates reports of medication management skills. A single-cohort convenience sample of patients hospitalized with heart failure was taught pill management skills using a tablet-based D-3 Pillbox. Medication reconciliation was conducted, and aptitude, performance (% completed), accuracy (% correct), and feasibility were measured. The mean age of the sample (n = 25) was 59 (36-89) years, 50% were women, 62% were black, 46% were uninsured, 46% had seventh-grade education or lower, and 31% scored very low for health literacy. However, most reported that the D-3 Pillbox was easy to read (78%), easy to repeat-demonstrate (78%), and comfortable to use (tablet weight) (75%). Accurate medication recognition was achieved by discharge in 98%, but only 25% reported having a "good understanding of my responsibilities." The D-3 Pillbox is a feasible approach for teaching medication management skills and can be used across clinical settings to reinforce skills and medication list accuracy.

  15. Challenges and strategies in applying performance measurement to federal public health programs.

    PubMed

    DeGroff, Amy; Schooley, Michael; Chapel, Thomas; Poister, Theodore H

    2010-11-01

    Performance measurement is widely accepted in public health as an important management tool supporting program improvement and accountability. However, several challenges impede developing and implementing performance measurement systems at the federal level, including the complexity of public health problems that reflect multiple determinants and involve outcomes that may take years to achieve, the decentralized and networked nature of public health program implementation, and the lack of reliable and consistent data sources and other issues related to measurement. All three of these challenges hinder the ability to attribute program results to specific public health program efforts. The purpose of this paper is to explore these issues in detail and offer potential solutions that support the development of robust and practical performance measures to meet the needs for program improvement and accountability. Adapting performance measurement to public health programs is both an evolving science and art. Through the strategies presented here, appropriate systems can be developed and monitored to support the production of meaningful data that will inform effective decision making at multiple levels. Published by Elsevier Ltd.

  16. Egnos Limitations over Central and Eastern Poland - Results of Preliminary Tests of Egnos-Eupos Integration Project

    NASA Astrophysics Data System (ADS)

    Jaworski, Leszek; Swiatek, Anna; Zdunek, Ryszard

    2013-09-01

    The problem of insufficient accuracy of EGNOS correction for the territory of Poland, located at the edge of EGNOS range is well known. The EEI PECS project (EGNOS EUPOS Integration) assumes improving the EGNOS correction by using the GPS observations from Polish ASG-EUPOS stations. One of the EEI project tasks was the identification of EGNOS performance limitations over Poland and services for EGNOSS-EUPOS combination. The two sets of data were used for those goals: statistical, theoretical data obtained using the SBAS simulator software, real data obtained during the measurements. The real measurements were managed as two types of measurements: static and dynamic. Static measurements are continuously managing using Septentrio PolaRx2 receiver. The SRC permanent station works in IMAGE/PERFECT project. Dynamic measurements were managed using the Mobile GPS Laboratory (MGL). Receivers (geodetic and navigation) were working in two modes: determining navigation position from standalone GPS, determining navigation position from GPS plus EGNOS correction. The paper presents results of measurements' analyses and conclusions based on which the next tasks in EEI project are completed

  17. Strategic performance in hospitals: the use of the balanced scorecard by nurse managers.

    PubMed

    Naranjo-Gil, David

    2009-01-01

    The competitive and dynamic health care sector has spurred hospitals into delivering greater flexibility and quality of services while cutting the hospital cost at the same time. However, hospitals differ in the extent to which they achieve these strategic goals. This article explores the use of a new management tool-the balanced scorecard-which facilitates managers to meet multiple strategic goals. It also analyzes how nurse managers use the balanced scorecard in an interactive or diagnostic way and its subsequent effect on strategic goal achievement (cost reduction and flexibility). It also examines how "balanced" is the balanced scorecard in terms of financial versus nonfinancial measures. Data were collected from a mail survey sent to 218 nurse managers in Spanish public hospitals. A satisfactory response rate was achieved, with 114 (52.29%) useful answered questionnaires. The results show that younger, more tenured, and clinically trained nurse managers would be more likely to use the balanced scorecard in an interactive way. Conversely, older, less tenured, and administratively trained managers would use it diagnostically. The results also indicate that the balanced scorecard facilitates the cost reduction and flexibility in hospitals only when it is used interactively. This article provides evidence that not only the technical design of the balanced scorecard matters, but also an appropriate use of the balanced scorecard is paramount for achievement of multiple strategic goals. An effective use of the balanced scorecard requires managers to actively stimulate dialogue and agreement among hospital's staff about desirable financial and nonfinancial performance measures in alignment with multiple strategic goals.

  18. Next level of board accountability in health care quality.

    PubMed

    Pronovost, Peter J; Armstrong, C Michael; Demski, Renee; Peterson, Ronald R; Rothman, Paul B

    2018-03-19

    Purpose The purpose of this paper is to offer six principles that health system leaders can apply to establish a governance and management system for the quality of care and patient safety. Design/methodology/approach Leaders of a large academic health system set a goal of high reliability and formed a quality board committee in 2011 to oversee quality and patient safety everywhere care was delivered. Leaders of the health system and every entity, including inpatient hospitals, home care companies, and ambulatory services staff the committee. The committee works with the management for each entity to set and achieve quality goals. Through this work, the six principles emerged to address management structures and processes. Findings The principles are: ensure there is oversight for quality everywhere care is delivered under the health system; create a framework to organize and report the work; identify care areas where quality is ambiguous or underdeveloped (i.e. islands of quality) and work to ensure there is reporting and accountability for quality measures; create a consolidated quality statement similar to a financial statement; ensure the integrity of the data used to measure and report quality and safety performance; and transparently report performance and create an explicit accountability model. Originality/value This governance and management system for quality and safety functions similar to a finance system, with quality performance documented and reported, data integrity monitored, and accountability for performance from board to bedside. To the authors' knowledge, this is the first description of how a board has taken this type of systematic approach to oversee the quality of care.

  19. Improving Trends in Gender Disparities in the Department of Veterans Affairs: 2008–2013

    PubMed Central

    Czarnogorski, Maggie; Wright, Steve M.; Hayes, Patricia M.; Haskell, Sally G.

    2014-01-01

    Increasing numbers of women veterans using Department of Veterans Affairs (VA) services has contributed to the need for equitable, high-quality care for women. The VA has evaluated performance measure data by gender since 2006. In 2008, the VA launched a 5-year women’s health redesign, and, in 2011, gender disparity improvement was included on leadership performance plans. We examined data from VA Office of Analytics and Business Intelligence quarterly gender reports for trends in gender disparities in gender-neutral performance measures from 2008 to 2013. Through reporting of data by gender, leadership involvement, electronic reminders, and population management dashboards, VA has seen a decreasing trend in gender inequities on most Health Effectiveness Data and Information Set performance measures. PMID:25100416

  20. Managing Science: Management for R&D Laboratories

    NASA Astrophysics Data System (ADS)

    Gelès, Claude; Lindecker, Gilles; Month, Mel; Roche, Christian

    1999-10-01

    A unique "how-to" manual for the management of scientific laboratories This book presents a complete set of tools for the management of research and development laboratories and projects. With an emphasis on knowledge rather than profit as a measure of output and performance, the authors apply standard management principles and techniques to the needs of high-flux, open-ended, separately funded science and technology enterprises. They also propose the novel idea that failure, and incipient failure, is an important measure of an organization's potential. From the management of complex, round-the-clock, high-tech operations to strategies for long-term planning, Managing Science: Management for R&D Laboratories discusses how to build projects with the proper research and development, obtain and account for funding, and deal with rapidly changing technologies, facilities, and trends. The entire second part of the book is devoted to personnel issues and the impact of workplace behavior on the various functions of a knowledge-based organization. Drawing on four decades of involvement with the management of scientific laboratories, the authors thoroughly illustrate their philosophy with real-world examples from the physics field and provide tables and charts. Managers of scientific laboratories as well as scientists and engineers expecting to move into management will find Managing Science: Management for R&D Laboratories an invaluable practical guide.

Top