40 CFR 130.6 - Water quality management plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...
Birmingham, Jackie
2004-01-01
Discharge planning is a legally mandated function for hospitals and is one of the "basic" hospital roles as outlined in Medicare's Conditions of Participation. This article will define discharge planning; describe the steps in the discharge planning process; list rules and regulations that influence discharge planning in hospitals; and compare hospital-based actions with payer-based actions when planning discharges. Case managers who work for payers interact with hospital-based case managers to facilitate the discharge planning process for patients. Those who form this patient-provider-payer triangle will benefit by reviewing the dynamics of the discharge planning process.
Adoption of Building Information Modelling in project planning risk management
NASA Astrophysics Data System (ADS)
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
DOT National Transportation Integrated Search
1974-02-01
The volume presents the plans for implementing the Satellite-Based Advanced Air Traffic Management System (SAATMS) described in Volumes II, III, and IV. Two plans are presented: an RDT&E plan and a transition plan. The RDT&E plan is presented as a se...
Principles of effective USA federal fire management plans
Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.
2015-01-01
Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.
DOT National Transportation Integrated Search
2009-04-01
The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-09
....YP0000] Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation... the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA Citizens...
Krinn, Kelly; Karaca-Mandic, Pinar; Blewett, Lynn A
2015-01-01
The state-based and federally facilitated health insurance Marketplaces, or exchanges, enrolled more than eight million people during the first open enrollment period, which ended March 31, 2014. There is significant variation in how states have designed and implemented their Marketplaces. We examined how premiums varied with states' involvement in the Marketplaces through governance, plan management authority, and strategy during the first year that the exchanges have been open. State-based Marketplaces using "clearinghouse" plan management models had significantly lower adjusted average premiums for all plans within each metal level compared to state-based Marketplaces using "active purchaser" models and the federally facilitated and partnership Marketplaces. Clearinghouse management models are those in which all health plans that meet published criteria are accepted. Active purchaser models are those in which states negotiate premiums, provider networks, number of plans, and benefits. Our baseline estimates provide valuable benchmarks for evaluating future performance of states' involvement in governance, plan management, and regulatory authority of the insurance Marketplaces. Project HOPE—The People-to-People Health Foundation, Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... we are adding to our docket to revise the South Coast Air Quality Management District (District or... Quality Management Plan (AQMP) is appropriate for determining the base year to evaluate the availability... offsets; and (3) which District Air Quality Management Plan is appropriate for determining the base year...
Management Information System Based on the Balanced Scorecard
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Ismo
2005-01-01
Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…
Design and realization of high quality prime farmland planning and management information system
NASA Astrophysics Data System (ADS)
Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin
2007-06-01
The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.
ERIC Educational Resources Information Center
Yelken, Tugba Yanpar; Kilic, Figen; Ozdemir, Caner
2012-01-01
In recent years, strategic planning has become one of the subjects that many institutions work on to ensure the institutions' appropriate management based on realistic results. Therefore, this planning has to be taken into account and should provide planning direction on the bases of its results. Basically, the manager of strategic planning,…
Marine Planning Benefits the Environment
Coastal and Marine Spatial Planning (CMSP) and Ecosystem-Based Management (EBM) are management approaches that allow sustainable coastal and ocean planning. The basic unit of management under CMSP is a large region, with the United States coastlines and Great Lakes divided into ...
Learning to manage a complex ecosystem: adaptive management and the Northwest Forest Plan.
George H. Stankey; Roger N. Clark; Bernard T. Bormann
2006-01-01
The Northwest Forest Plan (the Plan) identifies adaptive management as a central strategy for effective implementation. Despite this, there has been a lack of any systematic evaluation of its performance. This study is based on an extensive literature review, 50 interviews with resource managers and scientists involved with the Planâs implementation, and a survey of...
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-12-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-02-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
Project management plan for asbestos control at Randolph Air Force Base
DOE Office of Scientific and Technical Information (OSTI.GOV)
Broers, G.J.
1988-02-01
The United States Air Force Air Training Command (ATC) Headquarters requested assistance from the Idaho National Engineering Laboratory (INEL) in February, 1987 to develop processes and procedures and provide program management to minimize and control asbestos hazard at its thirteen bases. This effort was requested by the ATC to comply with Executive Order 12088 under which the USAF is directed to meet all applicable federal, state, and local environmental regulations. In response to that request the efforts identified within this document provide the ATC with a thorough base-wide Asbestos Survey Report, an Asbestos Management Plan and an Operations and Maintenancemore » Plan for Randolph AFB which, when implemented, will comply with current and anticipated federal laws and provide the base with accurate information needed for long range asbestos management. The other twelve bases will be surveyed and sampled in the four years to follow with appropriate asbestos management plans developed for each. 6 figs.« less
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
McDonnell, Diana D; Graham, Carrie L
2015-03-01
In 2011 California began transitioning approximately 340,000 seniors and people with disabilities from Medicaid fee-for-service (FFS) to Medicaid managed care plans. When beneficiaries did not actively choose a managed care plan, the state assigned them to one using an algorithm based on their previous FFS primary and specialty care use. When no clear link could be established, beneficiaries were assigned by default to a managed care plan based on weighted randomization. In this article we report the results of a telephone survey of 1,521 seniors and people with disabilities enrolled in Medi-Cal (California Medicaid) and who were recently transitioned to a managed care plan. We found that 48 percent chose their own plan, 11 percent were assigned to a plan by algorithm, and 41 percent were assigned to a plan by default. People in the latter two categories reported being similarly less positive about their experiences compared to beneficiaries who actively chose a plan. Many states in addition to California are implementing mandatory transitions of Medicaid-only beneficiaries to managed care plans. Our results highlight the importance of encouraging beneficiaries to actively choose their health plan; when beneficiaries do not choose, states should employ robust intelligent assignment algorithms. Project HOPE—The People-to-People Health Foundation, Inc.
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Information Systems for University Planning.
ERIC Educational Resources Information Center
Robinson, Robert J.
This paper proposes construction of a separate data base environment for university planning information, distinct from data bases and systems supporting operational functioning and management. The data base would receive some of its input from the management information systems (MIS)/transactional data bases and systems through a process of…
Evidence-Based Medicine in Managed Care: A Survey of Current and Emerging Strategies
Keckley, Paul H
2004-01-01
Background Evidence-based medicine is the “conscientious application of scientific best practice by clinicians in concert with patient understanding and values.”[1] Recent studies by the Institute of Medicine, RAND, and others have called attention to the gap between scientifically supported approaches to care and day-to-day practice by clinicians. Compounding the problem of non-adherence by providers, researchers have observed that patient compliance also falls short. As a result, avoidable costs from inappropriate variability in practice patterns coupled with patient noncompliance are a significant focus of managed care. Managed care plans play a key role in the selection of providers by consumers and in the design of benefits programs by employers. Avoidable costs from misuse, overuse, and under-use of care from clinicians is a strategic focus for health plans. The evidence upon which a plan makes coverage decisions and the incorporation of evidence in programs targeting providers, employers, and consumers was a focus of this study. Methodology A Delphi survey and 2-day interactive sessions with 128 clinical program directors and medical officers from 89 health plans were the primary methods used in this descriptive analysis. To test participant applications of evidence-based medicine in health plan medical management strategy, 3 conditions were used for illustrative purpose: managing rheumatoid arthritis, increasing remission in depression, and reducing heart disease among diabetics. Each provided a unique challenge to plans in terms of condition prevalence, strength of evidence, and cost. Key Findings Health plans incorporate evidence-based medicine in 5 areas overseen by medical management: (1) coverage decisions wherein improvements in pharmaceutical and therapeutic review processes are sought, (2) disease management efforts wherein increased attention to secondary prevention is desirable, (3) provider profiling wherein increased use of adherence measures comparing practices is a focus, (4) pay-for-performance programs linking physician adherence to financial incentives, and (5) consumer-directed care programs wherein patient compliance to evidence-based treatment directives is the focus. Factors that influence a plan's approach to a patient population include prevalence of the condition, the strength of evidence about a particular diagnostic or prognostic strategy, costs associated with the condition, and the influence of employers in coverage decisions. Conclusion Evidence-based medicine is the foundation for significant activity among plans to increase physician and patient adherence. There remain significant challenges in the implementation of evidence-based care management by plans, including the willingness of plans to agree on evidence-based guidelines, the willingness of employers to pay for evidence-based interventions, the balance of short- and long-term benefits for evidence-based interventions where secondary prevention is a consideration, and substantial distrust among providers. PMID:15266281
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
Nanaumi, Yoko; Onda, Mitsuko; Sakurai, Hidehiko; Tanaka, Rie; Tsubota, Kenichi; Matoba, Shunya; Mukai, Yusuke; Arakawa, Yukio; Hayase, Yukitoshi
2010-11-01
A survey of care managers ("CMs") was conducted to identify top priority issues in promoting the management and guidance of home-visiting by a pharmacist ("management and guidance") by focusing on the experience in incorporating the management and guidance into a care plan and its relevant factors. Major survey items included (1) number of years working as a CM, (2) basic occupation, (3) experience in incorporating the management and guidance into care plans, (4) understanding the management and guidance content, and (5) an awareness of the need for pharmacists' involvement in care plans. A χ² test was conducted to determine if the experience in incorporating the management and guidance into care plans caused a difference in the distribution of the number of years as a CM, the basic occupation, understanding of the management and guidance content, and an awareness of the need for pharmacists' involvement in care plans. A regression analysis was conducted to determine the degree of association between the incorporation experience and each item. The numbers of years working as a CM, the basic occupation, understanding of the management and guidance content, and an awareness of the need for pharmacists' involvement in care plans, were found to be associated with the experience in incorporating the management and guidance into care plans. Understanding of the management and guidance content was most closely associated. To promote pharmacists' management and guidance for home-based care, CMs need to deepen their understanding of this service.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for child care and guidance management and services I and II. Presented first…
Science-based strategic planning for hazardous fuel treatment.
D.L. Peterson; M.C. Johnson
2007-01-01
A scientific foundation coupled with technical support is needed to develop long-term strategic plans for fuel and vegetation treatments on public lands. These plans are developed at several spatial scales and are typically a component of fire management plans and other types of resource management plans. Such plans need to be compatible with national, regional, and...
Developing a web-based forecasting tool for nutrient management
USDA-ARS?s Scientific Manuscript database
Modern nutrient management planning tools provide strategic guidance that, in the best cases, educates farmers and others involved in nutrient management to make prudent management decisions. The strategic guidance provided by nutrient management plans does not provide the day-to-day support require...
Responsibility Center Management: An Assessment of RCM at IUPUI.
ERIC Educational Resources Information Center
Robbins, David L.; Rooney, Patrick Michael
1995-01-01
Indiana University-Purdue University at Indianapolis is the first public institution to implement Responsibility Center Management (RCM), a comprehensive decentralized, incentive-base financial management system. RCM has strengthened academic planning, budget management, general accountability, and multiyear fiscal planning. Organizational…
Groundwater regulation and integrated planning
Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.
2016-01-01
The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.
Place and place-based planning.
Linda E. Kruger; Daniel R. Williams
2007-01-01
Place-related concepts are factors in public involvement, conflict, recreation management, recreation displacement, landscape planning and design. This has captured the attention of researchers and managers. We posit that planning and management of public lands requires an understanding of what it is about the lands that people value and care about. In this paper we...
Halon 1301 management planning guidance
NASA Astrophysics Data System (ADS)
1995-05-01
This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture business and management (ABM) I and II. Presented first are a…
Two for one: a self-management plan coupled with a prescription sheet for children with asthma.
Ducharme, Francine M; Noya, Francisco; McGillivray, David; Resendes, Sandy; Ducharme-Bénard, Stéphanie; Zemek, Roger; Bhogal, Sanjit Kaur; Rouleau, Rachel
2008-10-01
Despite strong recommendations in the asthma guidelines, the use of written self-management plans remains low among asthmatic patients. To develop a written self-management plan, based on scientific evidence and expert opinions, in a format intended to facilitate its dispensing by health care professionals, and to test the perception of its relevance and clarity by asthmatic children, adolescents and adults. Inspired by previously tested self-management plans, surveys of asthma educators, expert opinions and the 2004 Canadian Asthma Guidelines, the authors simultaneously developed French and English versions of a written self-management plan that coupled with a prescription. The self-management plan was tested in parents and their asthmatic children (aged one to 17 years), and it was revised until 85% clarity and perceived relevance was achieved. Ninety-seven children and their parents were interviewed. Twenty per cent had a self-management plan. On the final revision, nearly all items were clear and perceived relevant by 85% or more of the interviewees. Two self-management plans were designed for clinics and acute care settings, respectively. The plans are divided into three control zones identified by symptoms with optional peak flow values and symbolized by traffic light colours. They are designed in triplicate format with a prescription slip, a medical chart copy and a patient copy. The written self-management plans, based on available scientific evidence and expert opinions, are clear and perceived to be relevant by children, adolescents and their parents. By incorporating the prescription and chart copies, they were designed to facilitate dispensing by physicians in both clinics and acute care settings.
Risk Based Framework for Geotechnical Asset Management
DOT National Transportation Integrated Search
2017-12-28
This report presents the outcome from a multi-year research study to incorporate a risk management framework for the Alaska Department of Transportation & Public Facilities Geotechnical Asset Management (GAM) Plan. The GAM Plan was developed by Paul ...
Yvonne Everett
2008-01-01
In 1999, Trinity County CA, initiated a participatory fire management planning effort. Since that time, the Trinity County Fire Safe Council has completed critical portions of a fire safe plan and has begun to implement projects defined in the plan. Completion of a GIS based, landscape scale fuels reduction element in the plan defined by volunteer fire fighters, agency...
Community-based asthma care: trial of a "credit card" asthma self-management plan.
D'Souza, W; Crane, J; Burgess, C; Te Karu, H; Fox, C; Harper, M; Robson, B; Howden-Chapman, P; Crossland, L; Woodman, K
1994-07-01
Although asthma self-management plans are widely recommended as essential in the long-term treatment of adult asthma, there have been few studies examining their use. Our objective was to assess the effect of a "credit card" adult asthma self-management plan in a community experiencing major health problems from asthma, by means of a before and after intervention trial of the efficacy of the "credit card" plan, when introduced through community-based asthma clinics. The participants were 69 Maori people with asthma. The "credit card" plan consisted of written guidelines for the self-management of asthma, based on self-assessment of asthma severity, printed on a plastic card. On one side, management guidelines were based on the interpretation of peak expiratory flow rate (PEFR) recordings, whilst the reverse side was based on symptoms. The outcome measures used were before and after comparison of markers of asthma morbidity and requirement for acute medical treatment; and a structured questionnaire assessing the acceptability and use of the credit card plan. Following the introduction of the plan, the mean PEFR increased from 347 to 389 l.min-1, the percentage of nights woken fell from 30.4 to 16.9%, and the number of days "out of action" fell from 3.8 to 1.7%. The requirements for acute medical treatment also fell during the intervention period. Most participants commented favourably on the content and usefulness of the plan. In the situation of worsening asthma, 28% of subjects found the peak flow side of the card most helpful, 7% the symptoms side, and 48% found both sides equally helpful.(ABSTRACT TRUNCATED AT 250 WORDS)
Natural resource assessment and decision support tools for bird conservation planning
Carl E. Korschgen; Melinda G. Knutson; Timothy J. Fox; Leslie Holland-Bartels; Henry C. Dehaan; Charles H. Theiling; Jason J. Rohweder; Kevin Kenow; Linda E. Leake; Tom Will
2005-01-01
We have used a place-based decision support system for several years to identify bird conservation issues relating to the management and planning needs of resource managers. Public and private land managers are constantly seeking better ways to incorporate landscape, species, and habitat relationships into the conservation planning process. The U.S. Fish and Wildlife...
Efficacy of a Transition Theory-Based Discharge Planning Program for Childhood Asthma Management.
Ekim, Ayfer; Ocakci, Ayse Ferda
2016-02-01
This study tested the efficacy of a nurse-led discharge planning program for childhood asthma management, based on transition theory. A quasi-experimental design was used. The sample comprised 120 children with asthma and their parents (intervention group n = 60, control group n = 60). The asthma management self-efficacy perception level of parents in the intervention group increased significantly and the number of triggers their children were exposed to at home was reduced by 60.8%. The rates of admission to emergency departments and unscheduled outpatient visits were significantly lower in the intervention group compared with the control group. Transition theory-based nursing interventions can provide successful outcomes on childhood asthma management. Transition theory-based discharge planning program can guide nursing interventions to standardize care of the child with asthma. Combining care at home with hospital care strengthens ongoing qualified asthma management. © 2015 NANDA International, Inc.
2014-06-01
21 C . CMMS USE IN THE LCS PROGRAM ......................................................22 D. CBM+ MAINTENANCE MANAGEMENT SYSTEM...45 b. Plan Maintenance Budgeting .................................................45 c . Plan Maintenance Logistics... Maintenance Planning ...................................46 b. Communicate Maintenance Budget .......................................46 c . Communicate
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
ERIC Educational Resources Information Center
Prew, Martin; Quaigrain, Kenneth
2010-01-01
This article looks at a school management tool that allows school managers and education district offices to review the performance of their schools and use the broad-based data to undertake orchestrated planning with districts planning delivery based on the needs of schools and in support of school improvement plans. The review process also…
Strategic Human Resource Planning in Academia
ERIC Educational Resources Information Center
Ulferts, Gregory; Wirtz, Patrick; Peterson, Evan
2009-01-01
A strategic plan guides a college in successfully meeting its mission. Based on the strategic plan, a college can develop a human resource plan that will allow it to make management decisions in the present to support the future direction of the college. The overall purpose of human resource management is to: (1) ensure the organization has…
Comparison of provider and plan-based targeting strategies for disease management.
Annis, Ann M; Holtrop, Jodi Summers; Tao, Min; Chang, Hsiu-Ching; Luo, Zhehui
2015-05-01
We aimed to describe and contrast the targeting methods and engagement outcomes for health plan-delivered disease management with those of a provider-delivered care management program. Health plan epidemiologists partnered with university health services researchers to conduct a quasi-experimental, mixed-methods study of a 2-year pilot. We used semi-structured interviews to assess the characteristics of program-targeting strategies, and calculated target and engagement rates from clinical encounter data. Five physician organizations (POs) with 51 participating practices implemented care management. Health plan member lists were sent monthly to the practices to accept patients, and then the practices sent back data reports regarding targeting and engagement in care management. Among patients accepted by the POs, we compared those who were targeted and engaged by POs with those who met health plan targeting criteria. The health plan's targeting process combined claims algorithms and employer group preferences to identify candidates for disease management; on the other hand, several different factors influenced PO practices' targeting approaches, including clinical and personal knowledge of the patients, health assessment information, and availability of disease-relevant programs. Practices targeted a higher percentage of patients for care management than the health plan (38% vs 16%), where only 7% of these patients met the targeting criteria of both. Practices engaged a higher percentage of their targeted patients than the health plan (50% vs 13%). The health plan's claims-driven targeting approach and the clinically based strategies of practices both provide advantages; an optimal model may be to combine the strengths of each approach to maximize benefits in care management.
Nurse manager succession planning: synthesis of the evidence.
Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria
2013-10-01
The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.
Opportunities for energy conservation in transportation planning and systems management.
DOT National Transportation Integrated Search
1978-01-01
This report is a summary, based primarily on a literature review, of the energy-savings potential of the elements in the transportation planning process and systems management. Within the scope of long-range planning, the energy aspects of land use a...
Performance-based planning and programming guidebook.
DOT National Transportation Integrated Search
2013-09-01
"Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...
Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel
2017-12-15
Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is needed to evaluate the implementation of the plans and, in many cases, the impact of the process on the plan. Performance can be improved with the assistance of policy makers by further developing guidelines, harmonising payment schemes with the conservation measures of the plans and providing training on conflict resolution. The evaluation framework proved to be suitable for the assessment of a large set of conservation related management planning processes, but it also had some limitations, e.g. concerning the incorporation of stakeholders' views in the evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.
Asset management: the big picture.
Deinstadt, Deborah C
2005-10-01
To develop an comprehensive asset management plan, you need, first of all, to understand the asset management continuum. A key preliminary step is to thoroughly assess the existing equipment base. A critical objective is to ensure that there are open lines of communication among the teams charged with managing the plan's various phases.
25 CFR 161.204 - How are carrying capacities and stocking rates established?
Code of Federal Regulations, 2010 CFR
2010-04-01
... be based on forage production, range utilization, the application of land management practices, and range improvements in place to achieve uniformity of grazing under sustained yield management principles... agricultural resource management plan and range unit management plan. (b) BIA, with the concurrence of the...
Preventing readmissions through comprehensive discharge planning.
Hunter, Tabitha; Nelson, James Rex; Birmingham, Jackie
2013-01-01
Case managers, including nurses and social workers, provide essential services to hospitalized patients, including mandated discharge planning that has been shown to impact patient safety and patient outcomes. The heightened attention to readmission is evident in both reimbursement and accreditation initiatives. The Centers for Medicare & Medicaid Services, Office of Clinical Standards & Quality/Survey & Certification Group, is revising worksheets to be used by surveyors to review how hospitals are complying with the Medicare Conditions of Participation with a focus on discharge planning as it relates to patient safety. This is an opportunity for case managers to apply the principles of case management to the targeted problem of readmissions. Now case managers must identify the reasons for readmission on a patient-by-patient basis, collect data, analyze processes, and then change practice in the hospital and work more closely with community-based providers. The purpose of this article is to recommend improvement in a consistent case management practice that will positively influence patient readmissions. Hospital-based case managers who are responsible for discharge planning functions. Hospital administrators will also find this information valuable as a tool to assess strategies to control preventable readmissions and to comply with the Medicare Conditions of Participation for discharge planning. Hospital-based case managers, responsible for discharge planning, have a unique opportunity to interact face-to-face with patients who are readmitted to determine factors that lead to the readmission. Case managers need to change their practice to include assessing patients on the basis of their prior level of care. Pharmacists need to play a bigger role in discharge planning, especially for patients who have experienced a potentially avoidable readmission. Working closely with community-based providers is essential to target reasons for readmission. The Medicare Conditions of Participation for Discharge Planning can be used not only to show compliance but as tools to evaluate current practice and identify areas of improvement. Preventable readmissions or rehospitalizations directly affect patient safety, patient outcome, hospital reimbursement, and hospital accreditation. Preventable readmissions can be controlled by comprehensive discharge planning. Case managers are directly involved in discharge planning and thus have direct accountability regarding readmissions; therefore, they must refine the admission assessment screening to include specific information based on a patient's preadmission level of care. Collaboration with community-based providers is essential to managing readmissions or rehospitalizations. Hospitals will find it beneficial to track readmissions by using specific data points unique to readmissions such as source of admission and previous length of stay. Self-assessment of compliance will help identify opportunities for quality improvement in the case management department. PLEASE NOTE: Rules and regulations are constantly changing. It is critical to monitor changes in standards. Information contained in this article is current at the time of submission, and readers are encouraged to review the content of this article with administration before implementing changes.
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
Harvesting costs for management planning for ponderosa pine plantations.
Roger D. Fight; Alex Gicqueau; Bruce R. Hartsough
1999-01-01
The PPHARVST computer application is Windows-based, public-domain software used to estimate harvesting costs for management planning for ponderosa pine (Pinus ponderosa Dougl. ex Laws.) plantations. The equipment production rates were developed from existing studies. Equipment cost rates were based on 1996 prices for new...
Description of data base management systems activities
NASA Technical Reports Server (NTRS)
1983-01-01
One of the major responsibilities of the JPL Computing and Information Services Office is to develop and maintain a JPL plan for providing computing services to the JPL management and administrative community that will lead to improved productivity. The CISO plan to accomplish this objective has been titled 'Management and Administrative Support Systems' (MASS). The MASS plan is based on the continued use of JPL's IBM 3032 Computer system for administrative computing and for the MASS functions. The current candidate administrative Data Base Management Systems required to support the MASS include ADABASE, Cullinane IDMS and TOTAL. Previous uses of administrative Data Base Systems have been applied to specific local functions rather than in a centralized manner with elements common to the many user groups. Limited capacity data base systems have been installed in microprocessor based office automation systems in a few Project and Management Offices using Ashton-Tate dBASE II. These experiences plus some other localized in house DBMS uses have provided an excellent background for developing user and system requirements for a single DBMS to support the MASS program.
Performance planning for rural planning organizations - final report.
DOT National Transportation Integrated Search
2017-02-01
Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...
Characteristics of health plans that treat psychiatric patients.
Zarin, D A; West, J C; Pincus, H A; Tanielian, T L
1999-01-01
Nationally representative data regarding the organizational, financial, and procedural features of health plans in which psychiatric patients receive treatment indicate that fewer privately insured, Medicaid, and Medicare managed care enrollees receive care from a psychiatrist than is true for "nonmanaged" enrollees. Financial considerations were reported to adversely affect treatment for one-third of all patients. Although utilization management techniques and financial/resource constraints commonly applied to patients in both managed and nonmanaged plans, performance-based incentives were rare in nonmanaged plans. The traditional health plan categories provide limited information to identify salient plan characteristics and guide policy decisions regarding the provision of care.
San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition
NASA Technical Reports Server (NTRS)
Werth, L. F. (Principal Investigator)
1981-01-01
The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.
Ring, Nicola; Jepson, Ruth; Hoskins, Gaylor; Wilson, Caroline; Pinnock, Hilary; Sheikh, Aziz; Wyke, Sally
2011-11-01
To understand better what helps and/or hinders asthma action plan use from the professionals and patients/carers perspective. Systematic review and qualitative synthesis (using meta-ethnography). Nineteen studies (20 papers) were included in an analysis of patients/carers' and professionals' views. Seven main influences on action plan implementation were identified including perceived un-helpfulness and irrelevance of the plans. Translation and synthesis of the original authors' interpretations suggested that action plan promotion and use was influenced by professional and patient/carers' asthma beliefs and attitudes and patient/carer experiences of managing asthma. Action plan use is hindered because professionals and patients/carers have different explanatory models of asthma, its management and their respective roles in the management process. Patients/carers, based on their experiential knowledge of their condition, perceive themselves as capable, effective in managing their asthma, but health professionals do not always share this view. Professionally provided medically focused action plans that do not 'fit' with and incorporate the patients'/carers' views of asthma, and their management strategies, will continue to be under-utilised. Professionals need to develop a more patient-centred, partnership-based, approach to the joint development and review of action plans, recognising the experiential asthma knowledge of patients/carers. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
Design and analysis of advanced flight planning concepts
NASA Technical Reports Server (NTRS)
Sorensen, John A.
1987-01-01
The objectives of this continuing effort are to develop and evaluate new algorithms and advanced concepts for flight management and flight planning. This includes the minimization of fuel or direct operating costs, the integration of the airborne flight management and ground-based flight planning processes, and the enhancement of future traffic management systems design. Flight management (FMS) concepts are for on-board profile computation and steering of transport aircraft in the vertical plane between a city pair and along a given horizontal path. Flight planning (FPS) concepts are for the pre-flight ground based computation of the three-dimensional reference trajectory that connects the city pair and specifies the horizontal path, fuel load, and weather profiles for initializing the FMS. As part of these objectives, a new computer program called EFPLAN has been developed and utilized to study advanced flight planning concepts. EFPLAN represents an experimental version of an FPS. It has been developed to generate reference flight plans compatible as input to an FMS and to provide various options for flight planning research. This report describes EFPLAN and the associated research conducted in its development.
Strategic planning features of subsurface management in Kemerovo Oblast
NASA Astrophysics Data System (ADS)
Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.
2016-09-01
The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.
ERIC Educational Resources Information Center
Obetta, Chukwuemeka K.; Oreh, Catherine I.
2017-01-01
Utilisation of community management strategies is an approach to governance that is based on community and organisational involvement. Communities with development projects have formed community projects management committees (CPMCs) that are encouraged to adopt the community management strategy in the planning and financing of community…
Continental United States Military Housing Inspection National Capital Region
2015-08-13
that was flaking, peeling, or chalking. JBAB did not have an asbestos management program, plan, or an appointed asbestos program manager...housing partner to ensure inspection and maintenance plan is achieved; and • Implement an asbestos management plan and appoint an asbestos program...select environmental health and safety requirements, such as those for drinking water, radon, asbestos , and lead based paint. We conducted this
Test Area C-62 Final Range Environmental Assessment at Eglin Air Force Base, Florida
2015-06-05
requirements to submit with EPCRA reports. Federal agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This...plan establishes procedures for the Eglin Air Force Base (AFB) facility asbestos management program. It contains the policies and procedures used in...controlling the health hazards created by asbestos containing materials (ACM), and the procedures used in ACM removal required to protect the health
The evolving role and care management approaches of safety-net Medicaid managed care plans.
Gusmano, Michael K; Sparer, Michael S; Brown, Lawrence D; Rowe, Catherine; Gray, Bradford
2002-12-01
This article provides new empirical data about the viability and the care management activities of Medicaid managed-care plans sponsored by provider organizations that serve Medicaid and other low-income populations. Using survey and case study methods, we studied these "safety-net" health plans in 1998 and 2000. Although the number of safety-net plans declined over this period, the surviving plans were larger and enjoying greater financial success than the plans we surveyed in 1998. We also found that, based on a partnership with providers, safety-net plans are moving toward more sophisticated efforts to manage the care of their enrollees. Our study suggests that, with supportive state policies, safety-net plans are capable of remaining viable. Contracting with safety-net plans may not be an efficient mechanism for enabling Medicaid recipients to "enter the mainstream of American health care," but it may provide states with an effective way to manage and coordinate the care of Medicaid recipients, while helping to maintain the health care safety-net for the uninsured.
Richard C. Knopf; Kathleen L. Andereck; Karen Tucker; Bill Bottomly; Randy J. Virden
2004-01-01
Purpose of Study This paper demonstrates how a Benefits-Based Management paradigm has been useful in guiding management plan development for an internationally significant natural resource â the Gunnison Gorge National Conservation Area (GGNCA) in Colorado. Through a program of survey research, a database on benefits desired by various stakeholder groups was created....
Christine Esposito
2006-01-01
The public's acceptance of forest management practices, including fuels reduction, is heavily based on how forests look. Fuels managers can improve their chances of success by considering aesthetics when making management decisions. This fact sheet reviews a three-part general strategy for managing fuels and visual quality: planning, implementation, and monitoring...
1991-12-01
AUSTRALIAN AIR FORCE STRATEGIC AIRLIFT PLANNING bY APPLICATION OF A COMPTER BASED MANAGEMENT INFO4ATION SYSTEM THESIS Presented to the Faculty of the...Master of Science in Information Management Neil A. Cooper, BBus Squadron Leader, RAAF December 1991 Approved for public release; distribution unlimited...grateful to the time and honest views given to me by the ADANS manager , Lieutenant Colonel Charlie Davis. For my Canadian research, I relied on the
Faleiro, J. R.; Ashok Kumar, J.
2008-01-01
The red palm weevil Rhynchophorus ferrugineus Olivier (Curculionidae/Rhynchophoridae/Dryophthoridae) is a lethal pest of young coconut palms, Cocos nucifera L. (Arecales: Arecaceae), with a highly aggregated population distribution pattern. R. ferrugineus is managed in several coconut growing countries using area-wide pheromone based programmes that need a substantial commitment of funds over a period of time. Often, decisions to implement area-wide management of R. ferrugineus are based on pheromone trap captures in surveillance traps and or infestation reports. Implementing area-wide management of this pest on the basis of such data can be inaccurate, as it may either under or over estimate the pest intensity in the field. This study presents sampling plans for rapid and accurate classification of R. ferrugineus infestation in coconut plantations of India by inspecting palms to detect infestation in a sequence until a decision to either implement or not to initiate area-wide management of R. ferrugineus can be made. The sampling plans are based on a common aggregation index of 3.45, assumed action threshold values of either 1.0 (plan A) or 0.5 (plan B) per cent infested palms and a risk factor of making the wrong decision set at 0.05. Using plans A and B, if the cummulative number of infested palms in a young 1 hectare coconut plantation is zero out of 150 palms for both plans, then area-wide management is not required, while on the other hand, if the cummulative number of infested palms for the same area is 6 (plan A), or 5 (plan B), then area-wide management of R. ferrugineus is essential. The proposed sampling plans are efficient tools in decision making, particularly at very low and high levels of infestation and can also be used to assess the performance of R. ferrugineus IPM programmes that are in progress. These plans not only save time and money as only a small area needs to be sampled to arrive at a correct decision, but are also efficient in rating the infestation level accurately. PMID:20337561
Faleiro, J R; Ashok Kumar, J
2008-01-01
The red palm weevil Rhynchophorus ferrugineus Olivier (Curculionidae/Rhynchophoridae/Dryophthoridae) is a lethal pest of young coconut palms, Cocos nucifera L. (Arecales: Arecaceae), with a highly aggregated population distribution pattern. R. ferrugineus is managed in several coconut growing countries using area-wide pheromone based programmes that need a substantial commitment of funds over a period of time. Often, decisions to implement area-wide management of R. ferrugineus are based on pheromone trap captures in surveillance traps and or infestation reports. Implementing area-wide management of this pest on the basis of such data can be inaccurate, as it may either under or over estimate the pest intensity in the field. This study presents sampling plans for rapid and accurate classification of R. ferrugineus infestation in coconut plantations of India by inspecting palms to detect infestation in a sequence until a decision to either implement or not to initiate area-wide management of R. ferrugineus can be made. The sampling plans are based on a common aggregation index of 3.45, assumed action threshold values of either 1.0 (plan A) or 0.5 (plan B) per cent infested palms and a risk factor of making the wrong decision set at 0.05. Using plans A and B, if the cumulative number of infested palms in a young 1 hectare coconut plantation is zero out of 150 palms for both plans, then area-wide management is not required, while on the other hand, if the cumulative number of infested palms for the same area is 6 (plan A), or 5 (plan B), then area-wide management of R. ferrugineus is essential. The proposed sampling plans are efficient tools in decision making, particularly at very low and high levels of infestation and can also be used to assess the performance of R. ferrugineus IPM programmes that are in progress. These plans not only save time and money as only a small area needs to be sampled to arrive at a correct decision, but are also efficient in rating the infestation level accurately.
Being Prepared for Climate Change: A Workbook for Developing Risk-Based Adaptation Plans
This workbook is a guide for environmental professionals to construct a climate change adaptation plan based on identifying risks and their consequences. It incorporates watershed management, vulnerability assessments and action planning.
Natural Resource Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, T.; Schwager, K.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less
Ponderosa pine forest structure and northern goshawk reproduction: Response to Beier et al
Richard T. Reynolds; Douglas A. Boyce; Russell T. Graham
2012-01-01
Ecosystem-based forest management requires long planning horizons to incorporate forest dynamics - changes resulting from vegetation growth and succession and the periodic resetting of these by natural and anthropogenic disturbances such as fire, wind, insects, and timber harvests. Given these dynamics, ecosystem-based forest management plans should specify desired...
Results-Based Monitoring and Evaluation at the Commonwealth of Learning: A Handbook
ERIC Educational Resources Information Center
Farrell, Glen M.
2009-01-01
Results-based management (RBM) is an approach to programme planning and management that integrates strategy, people, resources, processes and measurements to improve decision-making, transparency and accountability. The Commonwealth of Learning (COL) began the adoption of a RBM model with its 2003-2006 Three-Year Plan. This led to a significantly…
Planning actions in robot automated operations
NASA Technical Reports Server (NTRS)
Das, A.
1988-01-01
Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.
Developing standardized strategic response categories for fire management units
Matthew P. Thompson; Crystal S. Stonesifer; Robert C. Seli; Marlena Hovorka
2013-01-01
Federal wildland fire policy requires that publicly owned lands with burnable vegetation have a fire management plan (FMP); this applies to the five primary Federal fire agencies (Bureau of Indian Affairs, Bureau of Land Management, National Park Service, U.S. Fish and Wildlife Service, and Forest Service). FMPs are based on land and resource management plans and are...
Choudhry, Niteesh K; Fischer, Michael A; Smith, Benjamin F; Brill, Gregory; Girdish, Charmaine; Matlin, Olga S; Brennan, Troyen A; Avorn, Jerry; Shrank, William H
2014-03-01
Value-based insurance design (VBID) plans selectively lower cost sharing to increase medication adherence. Existing plans have been structured in a variety of ways, and these variations could influence the effectiveness of VBID plans. We evaluated seventy-six plans introduced by a large pharmacy benefit manager during 2007-10. We found that after we adjusted for the other features and baseline trends, VBID plans that were more generous, targeted high-risk patients, offered wellness programs, did not offer disease management programs, and made the benefit available only for medication ordered by mail had a significantly greater impact on adherence than plans without these features. The effects were as large as 4-5 percentage points. These findings can provide guidance for the structure of future VBID plans.
77 FR 32672 - Exemptions From Certain Prohibited Transaction Restrictions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-01
... (Principal Trust), 2012-11; D-11677, Weyerhaeuser Company (Weyerhaeuser) and Federalway Asset Management LP... interest in a Collective Fund and the receipt by Principal, thereby, of any investment management fee, any...; or (ii) Pays to Principal a Plan-Level Management Fee, based on total assets of such Client Plan...
Emergency management in health: key issues and challenges in the UK.
Lee, Andrew C K; Phillips, Wendy; Challen, Kirsty; Goodacre, Steve
2012-10-19
Emergency planning in the UK has grown considerably in recent years, galvanised by the threat of terrorism. However, deficiencies in NHS emergency planning were identified and the evidence-base that underpins it is questionable. Inconsistencies in terminologies and concepts also exist. Different models of emergency management exist internationally but the optimal system is unknown. This study examines the evidence-base and evidence requirements for emergency planning in the UK health context. The study involved semi-structured interviews with key stakeholders and opinion leaders. Purposive sampling was used to obtain a breadth of views from various agencies involved in emergency planning and response. Interviews were then analysed using a grounded approach using standard framework analysis techniques. We conducted 17 key informant interviews. Interviewees identified greater gaps in operational than technical aspects of emergency planning. Social and behavioural knowledge gaps were highlighted with regards to how individuals and organisations deal with risk and behave in emergencies. Evidence-based approaches to public engagement and for developing community resilience to disasters are lacking. Other gaps included how knowledge was developed and used. Conflicting views with regards to the optimal configuration and operation of the emergency management system were voiced. Four thematic categories for future research emerged:(i) Knowledge-base for emergency management: Further exploration is needed of how knowledge is acquired, valued, disseminated, adopted and retained.(ii) Social and behavioural issues: Greater understanding of how individuals approach risk and behave in emergencies is required.(iii) Organisational issues in emergencies: Several conflicting organisational issues were identified; value of planning versus plans, flexible versus standardized procedures, top-down versus bottom-up engagement, generic versus specific planning, and reactive versus proactive approaches to emergencies.(iv) Emergency management system: More study is required of system-wide issues relating to system configuration and operation, public engagement, and how emergency planning is assessed.
Yolasığmaz, Hacı Ahmet; Keleş, Sedat
2009-01-01
In Turkey, the understanding of planning focused on timber production has given its place on Multiple Use Management (MUM). Because the whole infrastructure of forestry with inventory system leading the way depends on timber production, some cases of bottle neck are expected during the transition period. Database design, probably the most important stage during the transition to MUM, together with the digital basic maps making up the basis of this infrastructure constitute the main point of this article. Firstly, the forest management philosophy of Turkey in the past was shortly touched upon in the article. Ecosystem Based Multiple Use Forest Management (EBMUFM) approaches was briefly introduced. The second stage of the process of EBMUFM, database design was described by examining the classical planning infrastructure and the coverage to be produced and consumed were suggested in the form of lists. At the application stage, two different geographical databases were established with GIS in Balcı Planning Unit of the years 1984 and 2006. Following that the related basic maps are produced. Timely diversity of the planning unit of 20 years is put forward comparatively with regard to the stand parameters such as tree types, age class, development stage, canopy closure, mixture, volume and increment.
Manpower Goals Planning and Accountability. Research Report 34.
ERIC Educational Resources Information Center
Niehaus, R. J.; Nitterhouse, D.
Based on previous application of goal programming models to manpower goals planning for large organizations, this paper structures the extensions from the planning process to the operations and control aspects of the management cycle. Emphasis is on the accountability necessary to make such a system an effective management control tool. In order…
Dynamic Strategic Planning in a Professional Knowledge-Based Organization
ERIC Educational Resources Information Center
Olivarius, Niels de Fine; Kousgaard, Marius Brostrom; Reventlow, Susanne; Quelle, Dan Grevelund; Tulinius, Charlotte
2010-01-01
Professional, knowledge-based institutions have a particular form of organization and culture that makes special demands on the strategic planning supervised by research administrators and managers. A model for dynamic strategic planning based on a pragmatic utilization of the multitude of strategy models was used in a small university-affiliated…
Tompkins, Emma L; Few, Roger; Brown, Katrina
2008-09-01
Climate change poses many challenges for ecosystem and resource management. In particular, coastal planners are struggling to find ways to prepare for the potential impacts of future climate change while dealing with immediate pressures. Decisions on how to respond to future risks are complicated by the long time horizons and the uncertainty associated with the distribution of impacts. Existing coastal zone management approaches in the UK either do not adequately incorporate changing stakeholder preferences, or effectively ensure that stakeholders are aware of the trade-offs inherent in any coastal management decision. Using a novel method, scenario-based stakeholder engagement, which brings together stakeholder analysis, climate change management scenarios and deliberative techniques, the necessary trade-offs associated with long term coastal planning are explored. The method is applied to two case studies of coastal planning in Christchurch Bay on the south coast of England and the Orkney Islands off the north coast of Scotland. A range of conflicting preferences exist on the ideal governance structure to manage the coast under different climate change scenarios. In addition, the results show that public understanding of the trade-offs that have to be made is critical in gaining some degree of public support for long term coastal decision-making. We conclude that scenario-based stakeholder engagement is a useful tool to facilitate coastal management planning that takes into account the complexities and challenges of climate change, and could be used in conjunction with existing approaches such as the Shoreline Management Planning process.
The Method of Multiple Spatial Planning Basic Map
NASA Astrophysics Data System (ADS)
Zhang, C.; Fang, C.
2018-04-01
The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.
Results from a national survey on chronic care management by health plans.
Mattke, Soeren; Higgins, Aparna; Brook, Robert
2015-05-01
The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.
Site-Based Management: Crisis or Opportunity?
ERIC Educational Resources Information Center
Lausberg, Clement H.
1990-01-01
If appropriate planning occurs, business officials can support site-based management. Districts need to develop new working relationships that appropriately balance the responsibility of the business office for district finances and support services with more site-based management at the school level. (MLF)
Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy
2016-01-01
We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.
Christina Kakoyannis; Bruce Shindler; George Stankey
2001-01-01
Natural resource managers are being confronted with increasing conflict and litigation with those who find their management plans unacceptable. Compatible and sustainable management decisions necessitate that natural resource agencies generate plans that are not only biologically possible and economically feasible but also socially acceptable. Currently, however, we...
J. John Stadt; Jim Schieck; Harry Stelfox
2006-01-01
The Alberta Biodiversity Monitoring Program is a rigorous science-based initiative that is being developed to monitor and report on biodiversity status and trends throughout the province of Alberta, Canada. Forest management plans in Alberta are required to monitor and report on the achievement of stated sustainable forest management objectives; however, the...
51. Roof plans, General Services Administration, Construction Management Division, Region ...
51. Roof plans, General Services Administration, Construction Management Division, Region 2, New York, October 29, 1976. Scale 1/31=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
34 CFR 607.21 - What are the selection criteria for planning grants?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Management. The Secretary reviews each application to determine the quality of the plan to manage the project... implement the project; and (4) The planning process is likely to achieve its intended results. (b) Key... in the project based on the extent to which— (1) The past experience and training of key personnel...
The use of recreation planning tools in U.S. Forest Service NEPA assessments
Lee K. Cerveny; Dale J. Blahna; Marc J. Stern; Michael J. Mortimer; S. Andrew Predmore; James Freeman
2011-01-01
U.S. Forest Service managers are required to incorporate social and biophysical science information in planning and environmental analysis. The use of science is mandated by the National Environmental Policy Act (NEPA), the National Forest Management Act, and U.S. Forest Service planning rules. Despite the agency's emphasis on "science-based"...
Cost accounting, management control, and planning in health care.
Siegrist, R B; Blish, C S
1988-02-01
Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)
2013-01-28
and coordination services by planning for and adapting to a rapidly changing military mission. 2. Restore the longleaf pine ecosystem and recover...success by supporting the Eglin AFB NRS adaptive management efforts through statistically sound, scientifically based monitoring of community...conservation targets, including sandhills, flatwoods, steepheads, seepage slopes, and stream habitats. Ecological monitoring supports adaptive
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory that describes the processes for planning and operating a total experience-based career education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experience in Career Education (CE)2. The area of…
Charles G. Shaw; Fred H. Everest; Douglas N. Swanston
2000-01-01
An innovative, knowledge-based partnership between research scientists and resource managers in the U.S. Forest Service provided the foundation upon which the Forest Plan was developed that will guide management on the Tongass National Forest for the next 10-15 years. Criteria developed by the scientists to evaluate if management decisions were consistent with the...
Weather integration in TMC operations : a self-evaluation and planning guide.
DOT National Transportation Integrated Search
2009-04-01
This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...
Best management practices for creating a community wildfire protection plan
Pamela J. Jakes; Christine Esposito; Sam Burns; Antony S. Cheng; Kristen C. Nelson; Victoria E. Sturtevant; Daniel R. Williams
2012-01-01
A community wildfire protection plan (CWPP) is a means of bringing local solutions to wildland fire management. In developing and implementing CWPPs, communities assume a leadership role in reducing wildfi re risk on federal and nonfederal land. In this publication, we identify best management practices for CWPP development and implementation based on the experiences...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... mission; and is consistent with principles of sound fish and wildlife management. Based on the associated...-acre Refuge was officially established on July 11, 1974, following approval of a general management plan for the Refuge by the Service and the Navy. Refuge purposes include preservation and management of...
John H. Cissel; Frederick J. Swanson; Gordon E. Grant; Deanna H. Olson; Gregory V. Stanley; Steven L. Garman; Linda R. Ashkenas; Matthew G. Hunter; Jane A. Kertis; James H. Mayo; Michelle D. McSwain; Sam G. Swetland; Keith A. Swindle; David O. Wallin
1998-01-01
The Augusta Creek project was initiated to establish and integrate landscape and watershed objectives into a landscape plan to guide management activities within a 7600-hectare (19,000-acre) planning area in western Oregon. Primary objectives included the maintenance of native species, ecosystem processes and structures, and long-term ecosystem productivity in a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zorpas, Antonis A., E-mail: antonis.zorpas@ouc.ac.cy; Lasaridi, Katia, E-mail: klasaridi@hua.gr; Voukkali, Irene
Highlights: • Waste framework directive has set clear waste prevention procedures. • Household Compositional analysis. • Waste management plans. • Zero waste approach. • Waste generation. - Abstract: Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impactmore » on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes.« less
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.
Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan
2017-03-01
Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.
General RMP Guidance - Chapter 9: Risk Management Plan
You must submit one risk management plan (RMP) to EPA for all of your covered processes. The internet-based RMP*eSubmit allows you to submit your RMP in EPA's Central Data Exchange (CDX), where you can access and change/correct existing RMPs.
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
Testing the robustness of management decisions to uncertainty: Everglades restoration scenarios.
Fuller, Michael M; Gross, Louis J; Duke-Sylvester, Scott M; Palmer, Mark
2008-04-01
To effectively manage large natural reserves, resource managers must prepare for future contingencies while balancing the often conflicting priorities of different stakeholders. To deal with these issues, managers routinely employ models to project the response of ecosystems to different scenarios that represent alternative management plans or environmental forecasts. Scenario analysis is often used to rank such alternatives to aid the decision making process. However, model projections are subject to uncertainty in assumptions about model structure, parameter values, environmental inputs, and subcomponent interactions. We introduce an approach for testing the robustness of model-based management decisions to the uncertainty inherent in complex ecological models and their inputs. We use relative assessment to quantify the relative impacts of uncertainty on scenario ranking. To illustrate our approach we consider uncertainty in parameter values and uncertainty in input data, with specific examples drawn from the Florida Everglades restoration project. Our examples focus on two alternative 30-year hydrologic management plans that were ranked according to their overall impacts on wildlife habitat potential. We tested the assumption that varying the parameter settings and inputs of habitat index models does not change the rank order of the hydrologic plans. We compared the average projected index of habitat potential for four endemic species and two wading-bird guilds to rank the plans, accounting for variations in parameter settings and water level inputs associated with hypothetical future climates. Indices of habitat potential were based on projections from spatially explicit models that are closely tied to hydrology. For the American alligator, the rank order of the hydrologic plans was unaffected by substantial variation in model parameters. By contrast, simulated major shifts in water levels led to reversals in the ranks of the hydrologic plans in 24.1-30.6% of the projections for the wading bird guilds and several individual species. By exposing the differential effects of uncertainty, relative assessment can help resource managers assess the robustness of scenario choice in model-based policy decisions.
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
Harrison, Donald L
2007-01-01
To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.
Are We Using Abdominal Radiographs Appropriately in the Management of Pediatric Constipation?
Beinvogl, Beate; Sabharwal, Sabina; McSweeney, Maireade; Nurko, Samuel
2017-12-01
To identify the reasons why pediatric gastroenterologists obtain abdominal radiographs in the management of pediatric constipation. This was a prospective study surveying providers regarding their rationale, interpretation, resultant change, and confidence in their management before and after obtaining KUBs in patients seen for suspected constipation. Demographics and clinical findings were obtained from medical records. A total of 24 providers were surveyed after 72 patient encounters. Reasons for obtaining an abdominal radiograph included evaluation of stool burden (70%), need for a clean out (35%), fecal impaction (27%), cause of abdominal pain (24%), demonstration of stool burden to families (14%), assessment of response to therapy (13%), or encopresis (10%). The plan was changed in 47.6% of cases based on radiographic findings. In cases in which a plan was outlined before obtaining the radiograph (69%), the initial plan was implemented on average in 52.5%. In cases with no plans before obtaining the radiograph, previously unconsidered plans were implemented in 8.7%. Provider confidence in the management plan increased from 2.4 ± 2.7 to 4.1 ± 1.8 (P < .05) after the abdominal radiograph. Abdominal radiographs commonly are obtained by pediatric gastroenterologists in the evaluation and management of constipation. The majority used it to make a diagnosis, and nearly one-half changed their management based on the imaging findings. Overall, they reported an improved confidence in their management plan, despite evidence that radiographic findings poorly correlate with clinical severity. This study highlights the need for further provider education regarding the recommendations delineated in existing constipation guidelines. Copyright © 2017 Elsevier Inc. All rights reserved.
Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...
Rocky Mountain Research Station USDA Forest Service
2004-01-01
The software described in this fact sheet provides managers with tools for visualizing forest and fuels information. Computer-based landscape simulations can help visualize stand and landscape conditions and the effects of different management treatments and fuel changes over time. These visualizations can assist forest planning by considering a range of management...
Chen, Xiujuan; Huang, Guohe; Zhao, Shan; Cheng, Guanhui; Wu, Yinghui; Zhu, Hua
2017-11-01
In this study, a stochastic fractional inventory-theory-based waste management planning (SFIWP) model was developed and applied for supporting long-term planning of the municipal solid waste (MSW) management in Xiamen City, the special economic zone of Fujian Province, China. In the SFIWP model, the techniques of inventory model, stochastic linear fractional programming, and mixed-integer linear programming were integrated in a framework. Issues of waste inventory in MSW management system were solved, and the system efficiency was maximized through considering maximum net-diverted wastes under various constraint-violation risks. Decision alternatives for waste allocation and capacity expansion were also provided for MSW management planning in Xiamen. The obtained results showed that about 4.24 × 10 6 t of waste would be diverted from landfills when p i is 0.01, which accounted for 93% of waste in Xiamen City, and the waste diversion per unit of cost would be 26.327 × 10 3 t per $10 6 . The capacities of MSW management facilities including incinerators, composting facility, and landfills would be expanded due to increasing waste generation rate.
Evaluative methodology for comprehensive water quality management planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dyer, H. L.
Computer-based evaluative methodologies have been developed to provide for the analysis of coupled phenomena associated with natural resource comprehensive planning requirements. Provisions for planner/computer interaction have been included. Each of the simulation models developed is described in terms of its coded procedures. An application of the models for water quality management planning is presented; and the data requirements for each of the models are noted.
Test Area C-74 Complex Final Range Environmental Assessment at Eglin Air Force Base, Florida
2015-08-21
LAWS, REGULATIONS, AND POLICIES ACRONYMS AND ABBREVIATIONS ACHP Advisory Council on Historic Preservation ACM asbestos -containing materials...agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This plan establishes procedures for the Eglin AFB...facility asbestos management program. It contains the policies and procedures used in controlling the health hazards created by asbestos containing
ERIC Educational Resources Information Center
Brown, Joshua W.; Rud, A. G.
2006-01-01
The development of course management plans and student behavioral guidelines are a necessary component for the foundation of any school or learning community. In this article the authors explore a few of the principal foundations of creating these plans based on the qualities Erasmus described in his great friend Thomas More. Teachers and…
The Northwest Forest Plan as a model for broad-scale ecosystem management: a social perspective.
Susan Charnley
2006-01-01
I evaluated the Northwest Forest Plan as a model for ecosystem management to achieve social and economic goals in communities located around federal forests in the US. Pacific Northwest. My assessment is based on the results of socioeconomic monitoring conducted to evaluate progress in achieving the plan's goals during its past 10 years. The assessment criteria I...
The Northwest Forest Plan as a model for broad-scale ecosystem management: a social perspective.
Susan Charnely
2006-01-01
I evaluated the Northwest Forest Plan as a model for ecosystem management to achieve social and economic goals in communities located around federal forests in the U.S. Pacific Northwest. My assessment is based on the results of socioeconomic monitoring conducted to evaluate progress in achieving the plan's goals during its past 10 years. The assessment criteria I...
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
Visual Decision Support Tool for Supporting Asset ...
Abstract:Managing urban water infrastructures faces the challenge of jointly dealing with assets of diverse types, useful life, cost, ages and condition. Service quality and sustainability require sound long-term planning, well aligned with tactical and operational planning and management. In summary, the objective of an integrated approach to infrastructure asset management is to assist utilities answer the following questions:•Who are we at present?•What service do we deliver?•What do we own?•Where do we want to be in the long-term?•How do we get there?The AWARE-P approach (www.aware-p.org) offers a coherent methodological framework and a valuable portfolio of software tools. It is designed to assist water supply and wastewater utility decision-makers in their analyses and planning processes. It is based on a Plan-Do-Check-Act process and is in accordance with the key principles of the International Standards Organization (ISO) 55000 standards on asset management. It is compatible with, and complementary to WERF’s SIMPLE framework. The software assists in strategic, tactical, and operational planning, through a non-intrusive, web-based, collaborative environment where objectives and metrics drive IAM planning. It is aimed at industry professionals and managers, as well as at the consultants and technical experts that support them. It is easy to use and maximizes the value of information from multiple existing data sources, both in da
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
Attachment Theory and Neuroscience for Care Managers.
Blakely, Thomas J; Dziadosz, Gregory M
2016-09-01
This article describes a model for care managers that is based on attachment theory supplemented by knowledge from neuroscience. Together, attachment theory and basic knowledge from neuroscience provide for both an organizing conceptual framework and a scientific, measureable approach to assessment and planning interventions in a care plan.
POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE
NRMRL QMP Training Course
Contact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov)
NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...
20 strategies for marketing your managed care plan.
Firshein, J
1996-01-01
In today's fiercely competitive managed care marketplace, healthcare executives must find a way to set their plans apart from the competition and build a sufficient customer base. At the same time, they must confront a growing anti-managed care backlash among a wary and confused public. Healthcare executive magazine talked with managed care experts to gather their views on key strategies to help executives meet both of these challenges. Here's what they suggest.
NASA Astrophysics Data System (ADS)
White, E.; Peterson, T. J.; Costelloe, J. F.; Western, A. W.; Carrara, E.
2017-12-01
Regulation of groundwater through the use of management plans is becoming increasingly prevalent as global groundwater levels decline. But plans are seldom systematically and quantitatively assessed for effectiveness. Instead, the state of an aquifer is commonly considered a proxy for plan effectiveness despite a lack of casaulity. Groundwater managers face myraid challenges such as finite resources, conflicting uses and the uncertainty inherent in any groundwater investigation. Groundwater models have been used to provide insights into what may happen to the aquifer under various levels of stress. Generally, these models simulate the impact of predefined stresses for a certain time-span. However, this is not how management occurs in reality. Managers only see a fraction of the aquifer and use this limited knowledgeto make aquifer-wide decisions. Also, management changes over time in response to aquifer state, and groundwater management plans commonly contain trigger levels in monitoring wells that prompt management intervention. In this way there is a feedback between the aquifer state and management that is rarely captured by groundwater management models. To capture this management/aquifer feedback, groundwater management was structured as a systems control problem, and using this framework, a testability assessment rubric developed. The rubric was applied to 15 Australian groundwater management plans and 47% of plans were found to be testable. To numerically quantify the effectiveness of groundwater managment, the impact of extraction restrictions was probabilistically assessed by simulating "the act of management" of a simple unconfined groundwater system using MODFLOW and Flopy. Water managers were privy only to head levels in a varying number of grid cells assigned as monitoring wells, and used that limited information to make allocation decisions at each time step. Extraction rates for each simulated management period were determined based upon the observed heads from the previous management period and adjusted depending upon triggers outlined in the management plan. The effectiveness of water restrictions as a management technique for the purpose of maintaining supply reliability under various decision making frequencies, aquifer response times and climate scenarios was explored.
Modeling Off-Nominal Recovery in NextGen Terminal-Area Operations
NASA Technical Reports Server (NTRS)
Callantine, Todd J.
2011-01-01
Robust schedule-based arrival management requires efficient recovery from off-nominal situations. This paper presents research on modeling off-nominal situations and plans for recovering from them using TRAC, a route/airspace design, fast-time simulation, and analysis tool for studying NextGen trajectory-based operations. The paper provides an overview of a schedule-based arrival-management concept and supporting controller tools, then describes TRAC implementations of methods for constructing off-nominal scenarios, generating trajectory options to meet scheduling constraints, and automatically producing recovery plans.
Neumann, Peter J
2005-07-01
Managed care plans have traditionally resisted using economic evidence explicitly in drug formulary decisions, even as they used ever more aggressive and sophisticated processes for managing care. In recent years, this has changed as health plans have begun to adopt evidence-based and value-based formulary submission guidelines. The guidelines have the potential to serve as a national unifying template for pharmacy and therapeutics committees to consider clinical and economic information in a systematic and rigorous fashion. However, many questions remain about their use and about the nature of communications (called "unsolicited requests") from plans to drug companies for information. This article describes the unsolicited request process and its potential impact on the use of economic evidence in formulary decisions.
Effectiveness of participatory planning for community management of fisheries in Bangladesh.
Sultana, Parvin; Abeyasekera, Savitri
2008-01-01
This study provides statistical evidence that support for community-based management of resources was more effective when initiated through a process known as participatory action plan development (PAPD). Thirty-six sites were studied where community management of fisheries was facilitated by NGOs. All involved community participation and establishing local fisheries management institutions. However, communities were able to take up more conservation-related interventions and faced fewer conflicts in the 18 sites where a PAPD was the basis for collective action and institution development. This indicates the value and effectiveness of adopting good practice in participatory planning, such as PAPD, which helps diverse stakeholders find common problems and solutions for natural resource management.
Risk-based water resources planning: Incorporating probabilistic nonstationary climate uncertainties
NASA Astrophysics Data System (ADS)
Borgomeo, Edoardo; Hall, Jim W.; Fung, Fai; Watts, Glenn; Colquhoun, Keith; Lambert, Chris
2014-08-01
We present a risk-based approach for incorporating nonstationary probabilistic climate projections into long-term water resources planning. The proposed methodology uses nonstationary synthetic time series of future climates obtained via a stochastic weather generator based on the UK Climate Projections (UKCP09) to construct a probability distribution of the frequency of water shortages in the future. The UKCP09 projections extend well beyond the range of current hydrological variability, providing the basis for testing the robustness of water resources management plans to future climate-related uncertainties. The nonstationary nature of the projections combined with the stochastic simulation approach allows for extensive sampling of climatic variability conditioned on climate model outputs. The probability of exceeding planned frequencies of water shortages of varying severity (defined as Levels of Service for the water supply utility company) is used as a risk metric for water resources planning. Different sources of uncertainty, including demand-side uncertainties, are considered simultaneously and their impact on the risk metric is evaluated. Supply-side and demand-side management strategies can be compared based on how cost-effective they are at reducing risks to acceptable levels. A case study based on a water supply system in London (UK) is presented to illustrate the methodology. Results indicate an increase in the probability of exceeding the planned Levels of Service across the planning horizon. Under a 1% per annum population growth scenario, the probability of exceeding the planned Levels of Service is as high as 0.5 by 2040. The case study also illustrates how a combination of supply and demand management options may be required to reduce the risk of water shortages.
Rolling capital: managing investments in a value-based care world.
Jasuta, Lynette
2016-06-01
The importance of capital planning is increasing as the healthcare industry moves toward value-based care. Replacing unwieldy and inflexible traditional capital planning processes with a rolling capital planning approach can result in: Greater standardization, facilitating better strategic planning across the whole system. Reduced labor intensity in the planning and budgeting process. Reduced costs through being able to plan better for replacement purchases and take advantage of group purchasing and bundling opportunities. Increased transparency in the decision-making process.
Assumption-Based Planning; A Planning Tool for Very Uncertain Times
1993-01-01
Ansoff , Igor H,, "Conceptual Underpinnings of Systematic Strategic Management," European Journal of Operational Research, Vol. 1, 1985, pp. 2-19...2Ansoff, Igor fI., *Conceptual Underpinnings of Systematic Strategic Management," European Journal ofOperational Resarch, Vol. 1, 1995, pp. 2-19. 72
Analysis of Workplace Health Education Performed by Occupational Health Managers in Korea.
Kim, Yeon-Ha; Jung, Moon-Hee
2016-09-01
To evaluate workplace health education as practiced by occupational health managers based on standardized job tasks and suggest priority tasks and areas to be trained. The study was conducted between November 10, 2013 and April 30, 2014. The tool used in this study was standardized job tasks of workplace health education for occupational health managers which was developed through methodological steps. It was evaluated by 233 worksite occupational health managers. Data were analyzed using SPSS 21.0. Predicting variables of workplace health education performance were the "analysis and planning" factor, type of enterprise, and form of management. Healthcare professionals and occupational health managers who managed the nonmanufacturing industry showed high importance and low performance level in "analysis and planning" factor. "Analysis and planning" skill is priority training area for healthcare professionals and occupational health managers who managed nonmanufacturing industry. It is necessary to develop a training curriculum for occupational health managers that include improving analysis of worksites and plans for a health education program. Copyright © 2016. Published by Elsevier B.V.
Annual Plan - Fiscal Year 2009
Includes Strategic Plan Update and Draft Plans for Oversight of the American Recovery and Reinvestment Act of 2009 Based Upon the Enterprise Risk Management Integrated Framework Model Developed by the Committee of Sponsoring Orgs of the Treadway Commission
Information for Institutional Renewal.
ERIC Educational Resources Information Center
Spencer, Richard L.
1979-01-01
Discusses a planning, management, and evaluation system, an objective-based planning process, research databases, analytical reports, and transactional data as state-of-the-art tools available to generate data which link research directly to planning for institutional renewal. (RC)
Taheri, Safoura; Ehsanpour, Soheila; Kohan, Shahnaze; Farzi, Saba; Jaafarpour, Molouk; Direkvand-Moghaddam, Ashraf
2014-03-01
Family planning is a lifestyle that is selected voluntarily and is based on the knowledge, attitude and responsible decision making by couples in order to promote the health and welfare of the family and the advancement of the society. In this regard, family planning counseling plays an important role in making informed decisions if used properly and in a responsible way. Detection of individual barriers in family planning counseling based on the viewpoints of managers, employees and clients who are key participants in the healthcare service provision is a major step towards appropriate planning to modify or eliminate such barriers. The present study was conducted with the goal of comparing managers', employees' and clients' viewpoints about individual barriers in family planning counseling in health care centers in Isfahan in 2012. This was a cross-sectional one-step three-group comparative descriptive study conducted on 295 subjects including 59 managers, 110 employees and 126 clients in medical health care centers in Isfahan in 2012. The managers and employees were selected by census sampling, and the clients were recruited through convenient random sampling. The data collection tool was a researcher-designed questionnaire, which was designed in two sections of fertility and personal characteristics, and viewpoint measurement. Descriptive and inferential statistical tests were used to analyze the data. The obtained results showed significant differences between mean scores of viewpoints in three groups of managers, employees and clients concerning individual barriers in family planning counseling. In addition, most of the managers, employees and clients reported individual barriers as an intermediate level barrier in the process of family planning counseling. Results indicate that subjects in three studied groups hold different views regarding the individual barriers in family planning counseling. This difference in the perspectives may be a factor that affects the quality of the provided services. Therefore, it is necessary for the healthcare providers to consider the main concerns of their clients regarding family planning.
Pattern-based information portal for business plan co-creation
NASA Astrophysics Data System (ADS)
Bontchev, Boyan; Ruskov, Petko; Tanev, Stoyan
2011-03-01
Creation of business plans helps entrepreneurs in managing identification of business opportunities and committing necessary resources for process evolution. Applying patterns in business plan creation facilitates the identification of effective solutions that were adopted in the past and may provide a basis for adopting similar solutions in the future within given business context. The article presents the system design of an information portal for business plan co-creation based on patterns. The portal is going to provide start-up and entrepreneurs with ready-to-modify business plan patterns in order to help them in development of effective and efficient business plans. It will facilitate entrepreneurs in co-experimenting and co-learning more frequently and faster. Moreover, the paper focuses on the software architecture of the pattern based portal and explains the functionality of its modules, namely the pattern designer, pattern repository services and agent-based pattern implementers. It explains their role for business process co-creation, storing and managing patterns described formally, and selecting patterns best suited for specific business case. Thus, innovative entrepreneurs will be guided by the portal in co-writing winning business plans and staying competitive in the present day dynamic globalized environment.
Pattern-based information portal for business plan co-creation
NASA Astrophysics Data System (ADS)
Bontchev, Boyan; Ruskov, Petko; Tanev, Stoyan
2010-10-01
Creation of business plans helps entrepreneurs in managing identification of business opportunities and committing necessary resources for process evolution. Applying patterns in business plan creation facilitates the identification of effective solutions that were adopted in the past and may provide a basis for adopting similar solutions in the future within given business context. The article presents the system design of an information portal for business plan co-creation based on patterns. The portal is going to provide start-up and entrepreneurs with ready-to-modify business plan patterns in order to help them in development of effective and efficient business plans. It will facilitate entrepreneurs in co-experimenting and co-learning more frequently and faster. Moreover, the paper focuses on the software architecture of the pattern based portal and explains the functionality of its modules, namely the pattern designer, pattern repository services and agent-based pattern implementers. It explains their role for business process co-creation, storing and managing patterns described formally, and selecting patterns best suited for specific business case. Thus, innovative entrepreneurs will be guided by the portal in co-writing winning business plans and staying competitive in the present day dynamic globalized environment.
A positive risk approach when clients choose to live at risk: a palliative case discussion.
De Bono, Christopher E; Henry, Blair
2016-09-01
The article discusses recent approaches in the literature about clients who chose to live at risk in their homes. It argues for a positive risk-based approach and a tool to help manage risk in the home, and applies these to a hypothetical end-of-life scenario. Historically, safety plans to consider risk management involved a culture of risk aversion supported by sometimes paternalistic motives intended to protect vulnerable clients. New findings in the literature engage in a process that respects the ethical principles underlying harm reduction philosophies. The literature also argues for a perspective that moves away from viewing risk as only harmful, to one that supports a positive understanding of risk as part of a client's informed choice. A risk support management plan, based on a positive approach, can provide a way to both support a client's choice to live at risk, anticipate for expected complications, and inform the creation of a contingency plan to address concerns as they may arise. The added value of a structured approach like the one proposed here for risk support management plans is that it provides adequate due diligence and informed decision-making when planning for risk-taking in complex situations.
30 CFR 282.21 - Plans, general.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... provide comments on proposed Delineation, Testing, and Mining Plans and any proposal for a significant... Mining Plan if the lessee has sufficient data and information on which to base a Testing or Mining Plan...
Hannan, M A; Abdulla Al Mamun, Md; Hussain, Aini; Basri, Hassan; Begum, R A
2015-09-01
In the backdrop of prompt advancement, information and communication technology (ICT) has become an inevitable part to plan and design of modern solid waste management (SWM) systems. This study presents a critical review of the existing ICTs and their usage in SWM systems to unfold the issues and challenges towards using integrated technologies based system. To plan, monitor, collect and manage solid waste, the ICTs are divided into four categories such as spatial technologies, identification technologies, data acquisition technologies and data communication technologies. The ICT based SWM systems classified in this paper are based on the first three technologies while the forth one is employed by almost every systems. This review may guide the reader about the basics of available ICTs and their application in SWM to facilitate the search for planning and design of a sustainable new system. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Ebersole, M. M.
1983-01-01
JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.
Natural Resource Management Plan for Brookhaven National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
green, T.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).« less
Evaluation of waterfowl conservation under the North American Waterfowl Management Plan
Williams, B.K.; Koneff, M.D.; Stith, David A.
1999-01-01
In 1986, the North American Waterfowl Management Plan (Plan) was signed by the U.S. Secretary of the Interior and the Canadian Minister of the Environment, with a goal of restoring waterfowl populations to levels of the 1970s via habitat conservation. Central to the Plan is a set of ambitious continental population goals and habitat objectives to be met through broad-based public-private partnerships. Inadequate attention has been paid to evaluation of the Plan, despite the fact that Plan delivery can be enhanced via improved understanding of the effects of habitat conservation on waterfowl population dynamics. Several factors confound the effort to evaluate the Plan at regional and continental levels, including difficulties in accounting for national land-use policies. To date, evaluation has proceeded along 2 avenues of investigation: (1) the study of conservation actions at local-regional levels, and (2) statistical assessment of Plan assumptions. Among other things, results thus far indicate duck production from the U.S. Northern Great Plains has increased in recent years, and intensive treatments such as planted cover have had positive effects on local reproductive success. Many duck species currently exceed Plan population goals; however, population levels of some species, most notably northern pintail (Anas acuta), remain below expectations based on historic relationships with precipitation. Management implications include the need for ongoing and more carefully prioritized conservation efforts, broader partnerships, and improved understanding of the linkages between habitats and biological processes. Delivery of the Plan must involve collaboration among the Continental Evaluation Team, joint Venture partners, the Adaptive Management and Assessment Team of the U.S. Fish and Wildlife Service, and other conservation groups. Although the challenges and projected costs of Plan conservation efforts are considerable, the long-term potential benefits to waterfowl conservation are great.
Lam, Sean Shao Wei; Zhang, Ji; Zhang, Zhong Cheng; Oh, Hong Choon; Overton, Jerry; Ng, Yih Yng; Ong, Marcus Eng Hock
2015-02-01
Dynamically reassigning ambulance deployment locations throughout a day to balance ambulance availability and demands can be effective in reducing response times. The objectives of this study were to model dynamic ambulance allocation plans in Singapore based on the system status management (SSM) strategy and to evaluate the dynamic deployment plans using a discrete event simulation (DES) model. The geographical information system-based analysis and mathematical programming were used to develop the dynamic ambulance deployment plans for SSM based on ambulance calls data from January 1, 2011, to June 30, 2011. A DES model that incorporated these plans was used to compare the performance of the dynamic SSM strategy against static reallocation policies under various demands and travel time uncertainties. When the deployment plans based on the SSM strategy were followed strictly, the DES model showed that the geographical information system-based plans resulted in approximately 13-second reduction in the median response times compared to the static reallocation policy, whereas the mathematical programming-based plans resulted in approximately a 44-second reduction. The response times and coverage performances were still better than the static policy when reallocations happened for only 60% of all the recommended moves. Dynamically reassigning ambulance deployment locations based on the SSM strategy can result in superior response times and coverage performance compared to static reallocation policies even when the dynamic plans were not followed strictly. Copyright © 2014 Elsevier Inc. All rights reserved.
Use of Web Technology to Access and Update College Plans
ERIC Educational Resources Information Center
Valeau, Edward J.; Luan, Jing
2007-01-01
In this study, the process and outcome of a web-based planning application, called Ports of Call, are discussed. The application allows college management to create, edit, and report out activities relating to college plans, all through a web browser. Its design was based on best practices in modern web technology and the application can be easily…
Discharge planning, nursing home placement, and the Internet.
Collier, Eric J; Harrington, Charlene
2005-01-01
Effective discharge planning and well-coordinated case management related to nursing home (NH) placement are key services in acute-care hospitals. (1) identify the individuals and important factors involved in the discharge planning process; (2) describe the types/sources of information used by discharge planners to recommend specific nursing homes for patients and families; and (3) determine which methods are used to evaluate the quality of US nursing homes (NHs). Descriptive study, with a convenience sample of 41 discharge planners and case managers from California acute-care hospitals. This study found that patients, families, friends, and physicians are all involved in the discharge planning process along with discharge planners and/or case managers. Discharge planners/case managers were generally concerned about NH bed availability, geographic location, and financial considerations. Although the discharge planners and case managers were able to articulate important indicators of quality in NHs, such information was not routinely considered during discharge planning activities. Discharge planners and case managers need to play a more central role in the decision-making process related to the selection of a NH, especially because decisions are time-limited and can benefit from a well-planned discharge planning program that uses a variety of data on quality and costs. The widespread use of Internet-based information sources can be expanded to aid this process.
The U.S. National Plan for Civil Earth Observations
NASA Astrophysics Data System (ADS)
Stryker, T.; Clavin, C.; Gallo, J.
2014-12-01
Globally, the United Sates Government is one of the largest providers of environmental and Earth-system data. As the nation's Earth observation capacity has grown, so have the complexity and challenges associated with managing Earth observation systems and related data holdings. In July 2014, the White House Office of Science and Technology Policy released the first-ever National Plan for Civil Earth Observations to address these challenges. The Plan provides a portfolio management-based framework for maximizing the value of Federal Earth observations. The Plan identifies Federal priorities for Earth observations and improved management of their data. Through routine assessments, expanding data management efforts, interagency planning, and international collaboration, OSTP and its partner agencies will seek ensure the continued provision of and access to key Earth observation data, which support a broad range of public services and research programs. The presenters will provide a detailed review of the components of the National Plan, its impacts across the Federal agencies involved in Earth observations, and associated efforts to enable interagency coordination.
Integrating impact assessment and conflict management in urban planning: Experiences from Finland
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peltonen, Lasse, E-mail: lasse.peltonen@tkk.f; Sairinen, Rauno, E-mail: rauno.sairinen@joensuu.f
2010-09-15
The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impactmore » assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.« less
Resource Management in Constrained Dynamic Situations
NASA Astrophysics Data System (ADS)
Seok, Jinwoo
Resource management is considered in this dissertation for systems with limited resources, possibly combined with other system constraints, in unpredictably dynamic environments. Resources may represent fuel, power, capabilities, energy, and so on. Resource management is important for many practical systems; usually, resources are limited, and their use must be optimized. Furthermore, systems are often constrained, and constraints must be satisfied for safe operation. Simplistic resource management can result in poor use of resources and failure of the system. Furthermore, many real-world situations involve dynamic environments. Many traditional problems are formulated based on the assumptions of given probabilities or perfect knowledge of future events. However, in many cases, the future is completely unknown, and information on or probabilities about future events are not available. In other words, we operate in unpredictably dynamic situations. Thus, a method is needed to handle dynamic situations without knowledge of the future, but few formal methods have been developed to address them. Thus, the goal is to design resource management methods for constrained systems, with limited resources, in unpredictably dynamic environments. To this end, resource management is organized hierarchically into two levels: 1) planning, and 2) control. In the planning level, the set of tasks to be performed is scheduled based on limited resources to maximize resource usage in unpredictably dynamic environments. In the control level, the system controller is designed to follow the schedule by considering all the system constraints for safe and efficient operation. Consequently, this dissertation is mainly divided into two parts: 1) planning level design, based on finite state machines, and 2) control level methods, based on model predictive control. We define a recomposable restricted finite state machine to handle limited resource situations and unpredictably dynamic environments for the planning level. To obtain a policy, dynamic programing is applied, and to obtain a solution, limited breadth-first search is applied to the recomposable restricted finite state machine. A multi-function phased array radar resource management problem and an unmanned aerial vehicle patrolling problem are treated using recomposable restricted finite state machines. Then, we use model predictive control for the control level, because it allows constraint handling and setpoint tracking for the schedule. An aircraft power system management problem is treated that aims to develop an integrated control system for an aircraft gas turbine engine and electrical power system using rate-based model predictive control. Our results indicate that at the planning level, limited breadth-first search for recomposable restricted finite state machines generates good scheduling solutions in limited resource situations and unpredictably dynamic environments. The importance of cooperation in the planning level is also verified. At the control level, a rate-based model predictive controller allows good schedule tracking and safe operations. The importance of considering the system constraints and interactions between the subsystems is indicated. For the best resource management in constrained dynamic situations, the planning level and the control level need to be considered together.
Current and future directions in Medi-Cal chronic disease care management: a view from the top.
Goldman, L Elizabeth; Handley, Margaret; Rundall, Thomas G; Schillinger, Dean
2007-05-01
To determine the extent to which Medicaid managed care (MMC) organizations are engaged in chronic disease care management (CDCM), tailor CDCM for diverse populations, or plan to expand CDCM. Web-based survey of 23 eligible California MMC health plan executives in fall 2005. Frequency distributions of survey responses. Nineteen (83%) of 23 executives responded, representing 2.5 million beneficiaries. Eighteen (95%) MMC plans reported implementing 1 or more elements of CDCM. Although plans used a wide range of CDCM strategies to reach performance goals, most implemented provider awareness activities such as offering guidelines or disease-specific feedback to physician groups. More than half of the plans reported interest in expanding CDCM to include more active interventions such as disease registries, pay for performance, telephone counseling to patients, and other self-management support programs. Few plans reported tailoring their CDCM to vulnerable member populations such as those with limited literacy or limited English proficiency. Executives reported that insufficient financial resources at the plan level, lack of organizational leadership and commitment in physician organizations, and limited information technology in physician offices were barriers to CDCM expansion. California MMC health plans reported substantial interest in CDCM and a desire to increase CDCM. Representatives reported intentions to expand to strategies that more directly engage providers and patients. To ensure that the growing number of vulnerable enrollees with chronic disease receive high-quality care, policy efforts should focus on enabling MMC health plans to more consistently implement and target population-based strategies such as CDCM.
Need for evaluative methodologies in land use, regional resource and waste management planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Croke, E. J.
The transfer of planning methodology from the research community to the practitioner very frequently takes the form of analytical and evaluative techniques and procedures. In the end, these become operational in the form of data acquisition, management and display systems, computational schemes that are codified in the form of manuals and handbooks, and computer simulation models. The complexity of the socioeconomic and physical processes that govern environmental resource and waste management have reinforced the need for computer assisted, scientifically sophisticated planning models that are fully operational, dependent on an attainable data base and accessible in terms of the resources normallymore » available to practitioners of regional resource management, waste management, and land use planning. A variety of models and procedures that attempt to meet one or more of the needs of these practitioners are discussed.« less
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
Management strategies in hospitals: scenario planning.
Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph
2015-01-01
Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.
ERIC Educational Resources Information Center
Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.
2018-01-01
Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…
Policy, Planning and Management of Education in Small States.
ERIC Educational Resources Information Center
Lillis, Kevin M., Ed.
This book offers a range of original perspectives on issues of planning and managing education in small systems. It is based on the proceedings of a conference held at the University of London's Institute for Education, supported by the European Community Directorate General for Development. The conference addressed a range of themes relevant to…
What Are the Attributes and Duties of the School Crisis Intervention Team?
ERIC Educational Resources Information Center
Gullatt, David E.; Long, Douglas
1996-01-01
Physical measures such as weapons checks and metal detectors are inadequate to forestall school violence. The key to managing crises is a trained, broad-based crisis-intervention team and a crisis-management plan. Team responsibilities include developing an intervention plan, coordinating with community services, educating and training staff, and…
ERIC Educational Resources Information Center
Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha
2012-01-01
This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…
A Model for Talent Management and Career Planning
ERIC Educational Resources Information Center
Waheed, Sajjad; Zaim, A. Halim
2015-01-01
This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…
DOT National Transportation Integrated Search
2010-02-01
This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...
Designing the role of the embedded care manager.
Hines, Patricia; Mercury, Marge
2013-01-01
: The role of the professional case manager is changing rapidly. Health reform has called upon the industry to ensure that care is delivered in an efficient, effective, and high-quality and low cost manner. As a means to achieve this objective, health plans and health systems are moving the care manager out of a centralized location within their organizations to "embedding" them into physician offices. This move enables the care manager to work alongside the primary care physicians and their high-risk patients. This article discusses the framework for designing and implementing an embedded care manager role into a physician practice. Key elements of the program are discussed. IMPLICATIONS FOR CARE MANAGEMENT:: Historically care management has played a foundational role in improving the quality of care for individuals and populations via the efficient and effective use of resources. Now with the goals of health care reform, a successful transition from a volume-based to value-based reimbursement system requires primary care physicians to welcome care managers into their practices to improve patient care, quality, and costs through care coordination across health care settings and populations. : As patient-centered medical homes and integrated delivery systems formulate their plans for population health management, their efforts have included embedding a care manager in the primary practice setting. Having care managers embedded at the physician offices increases their ability to collaborate with the physician and their staff in the implementation and monitoring care plans for their patients. : Implementing an embedded care manager into an existing physician's practice requires the following:Although the embedded care manager is a highly evolving role, physician groups are beginning to realize the benefits from their care management collaborations. Examples cited include improved outreach and coordination, patient adherence to care plans, and improved quality of life.
Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.
West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra
2017-01-01
The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.
Software Management Environment (SME): Components and algorithms
NASA Technical Reports Server (NTRS)
Hendrick, Robert; Kistler, David; Valett, Jon
1994-01-01
This document presents the components and algorithms of the Software Management Environment (SME), a management tool developed for the Software Engineering Branch (Code 552) of the Flight Dynamics Division (FDD) of the Goddard Space Flight Center (GSFC). The SME provides an integrated set of visually oriented experienced-based tools that can assist software development managers in managing and planning software development projects. This document describes and illustrates the analysis functions that underlie the SME's project monitoring, estimation, and planning tools. 'SME Components and Algorithms' is a companion reference to 'SME Concepts and Architecture' and 'Software Engineering Laboratory (SEL) Relationships, Models, and Management Rules.'
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... waste management provisions that are sufficient to comply with the requirements of this part. The owner... that the plan be based on the National Response Team's Integrated Contingency Plan Guidance (“One Plan”). When modifications are made to non-RCRA provisions in an integrated contingency plan, the changes do...
76 FR 69707 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... implementation of Ecosystem Based Fishery Management. A specific topic to be discussed will be the Council plan for moving forward with the development of ecosystem based fishery management approach in 2012. In... final topic to be discussed will be potential revisions to the Council's Statement of Organization...
2014-01-01
Background Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. Methods We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Results Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Conclusions Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process. PMID:24428945
Rutten, Geert M; Harting, Janneke; Bartholomew, Leona K; Braspenning, Jozé C; van Dolder, Rob; Heijmans, Marcel Fgj; Hendriks, Erik Jm; Kremers, Stef Pj; van Peppen, Roland Ps; Rutten, Steven Tj; Schlief, Angelique; de Vries, Nanne K; Oostendorp, Rob Ab
2014-01-15
Systematic planning could improve the generally moderate effectiveness of interventions to enhance adherence to clinical practice guidelines. The aim of our study was to demonstrate how the process of Intervention Mapping was used to develop an intervention to address the lack of adherence to the national CPG for low back pain by Dutch physical therapists. We systematically developed a program to improve adherence to the Dutch physical therapy guidelines for low back pain. Based on multi-method formative research, we formulated program and change objectives. Selected theory-based methods of change and practical applications were combined into an intervention program. Implementation and evaluation plans were developed. Formative research revealed influential determinants for physical therapists and practice quality managers. Self-regulation was appropriate because both the physical therapists and the practice managers needed to monitor current practice and make and implement plans for change. The program stimulated interaction between practice levels by emphasizing collective goal setting. It combined practical applications, such as knowledge transfer and discussion-and-feedback, based on theory-based methods, such as consciousness raising and active learning. The implementation plan incorporated the wider environment. The evaluation plan included an effect and process evaluation. Intervention Mapping is a useful framework for formative data in program planning in the field of clinical guideline implementation. However, a decision aid to select determinants of guideline adherence identified in the formative research to analyse the problem may increase the efficiency of the application of the Intervention Mapping process.
Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts
Parker, Gene W.; Pinson, Harlow
1993-01-01
A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.
Typology and indicators of ecosystem services for marine spatial planning and management.
Böhnke-Henrichs, Anne; Baulcomb, Corinne; Koss, Rebecca; Hussain, S Salman; de Groot, Rudolf S
2013-11-30
The ecosystem services concept provides both an analytical and communicative tool to identify and quantify the link between human welfare and the environment, and thus to evaluate the ramifications of management interventions. Marine spatial planning (MSP) and Ecosystem-based Management (EBM) are a form of management intervention that has become increasingly popular and important globally. The ecosystem service concept is rarely applied in marine planning and management to date which we argue is due to the lack of a well-structured, systematic classification and assessment of marine ecosystem services. In this paper we not only develop such a typology but also provide guidance to select appropriate indicators for all relevant ecosystem services. We apply this marine-specific ecosystem service typology to MSP and EBM. We thus provide not only a novel theoretical construct but also show how the ecosystem services concept can be used in marine planning and management. Copyright © 2013 Elsevier Ltd. All rights reserved.
Kimura, Joe; DaSilva, Karen; Marshall, Richard
2008-02-01
The increasing prevalence of chronic illnesses in the United States requires a fundamental redesign of the primary care delivery system's structure and processes in order to meet the changing needs and expectations of patients. Population management, systems-based practice, and planned chronic illness care are 3 potential processes that can be integrated into primary care and are compatible with the Chronic Care Model. In 2003, Harvard Vanguard Medical Associates, a multispecialty ambulatory physician group practice based in Boston, Massachusetts, began implementing all 3 processes across its primary care practices. From 2004 to 2006, the overall diabetes composite quality measures improved from 51% to 58% for screening (HgA1c x 2, low-density lipoprotein, blood pressure in 12 months) and from 13% to 17% for intermediate outcomes (HgA1c
Planning and Preparation for CD-ROM Implementation: The Citadel Library.
ERIC Educational Resources Information Center
Maynard, J. Edmund
Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…
The challenges associated with developing science-based landscape scale management plans.
Robert C. Szaro; Douglas A. Jr. Boyce; Thomas Puchlerz
2005-01-01
Planning activities over large landscapes poses a complex of challenges when trying to balance the implementation of a conservation strategy while still allowing for a variety of consumptive and nonconsumptive uses. We examine a case in southeast Alaska to illustrate the breadth of these challenges and an approach to developing a science-based resource plan. Not only...
Water resources planning based on complex system dynamics: A case study of Tianjin city
NASA Astrophysics Data System (ADS)
Zhang, X. H.; Zhang, H. W.; Chen, B.; Chen, G. Q.; Zhao, X. H.
2008-12-01
A complex system dynamic (SD) model focusing on water resources, termed as TianjinSD, is developed for the integrated and scientific management of the water resources of Tianjin, which contains information feedback that governs interactions in the system and is capable of synthesizing component-level knowledge into system behavior simulation at an integrated level, thus presenting reasonable predictive results for policy-making on water resources allocation and management. As for the Tianjin city, interactions among 96 components for 12 years are explored and four planning alternatives are chosen, one of which is based on the conventional mode assuming that the existing pattern of human activities will be prevailed, while the others are alternative planning designs based on the interaction of local authorities and planning researchers. Optimal mode is therefore obtained according to different scenarios when compared the simulation results for evaluation of different decisions and dynamic consequences.
NASA Astrophysics Data System (ADS)
Kolahi, Mahdi; Sakai, Tetsuro; Moriya, Kazuyuki; Makhdoum, Majid F.; Koyama, Lina
2013-08-01
The requirement to assess the management effectiveness (ME) in protected areas (PAs) is increasing around the world to help improve management and accountability. An evaluation of ME for Khojir National Park (KNP), one of the Iran's oldest PAs, was conducted using a multi-method approach that consisted of structured interviews, open interviews, and site visits. This was the first ME evaluation in Iran. The structured interview was based on the management effectiveness tracking tool methodology. KNP received an average score of 43 %, which is lower than the global average, illustrating that its general management was in the low-intermediate level. The indices of legal status, resource inventory, planning for land and water use, regulations, and objectives received the highest average scores, whereas education and awareness, community co-management, regular work plan, boundary demarcation, visitor facilities, budget sources, staff training, protection systems, and management plan received the lowest ones. The management system of KNP was generally established, but many problems of the management still need to be resolved. To improve ME, some countermeasures should be taken, such as increasing funding, strengthening capacity building, planning, and adaptive management, and implementing community participation.
NASA Technical Reports Server (NTRS)
1998-01-01
Under an SBIR (Small Business Innovative Research) contract with Johnson Space Center, Knowledge Based Systems Inc. (KBSI) developed an intelligent software environment for modeling and analyzing mission planning activities, simulating behavior, and, using a unique constraint propagation mechanism, updating plans with each change in mission planning activities. KBSI developed this technology into a commercial product, PROJECTLINK, a two-way bridge between PROSIm, KBSI's process modeling and simulation software and leading project management software like Microsoft Project and Primavera's SureTrak Project Manager.
Shegog, Ross; Begley, Charles E
2017-01-01
Epilepsy is a neurological disorder involving recurrent seizures. It affects approximately 5 million people in the U.S. To optimize their quality of life people with epilepsy are encouraged to engage in self-management (S-M) behaviors. These include managing their treatment (e.g., adhering to anti-seizure medication and clinical visit schedules), managing their seizures (e.g., responding to seizure episodes), managing their safety (e.g., monitoring and avoiding environmental seizure triggers), and managing their co-morbid conditions (e.g., anxiety, depression). The clinic-based Management Information Decision Support Epilepsy Tool (MINDSET) is a decision-support system founded on theory and empirical evidence. It is designed to increase awareness by adult patients (≥18 years) and their health-care provider regarding the patient's epilepsy S-M behaviors, facilitate communication during the clinic visit to prioritize S-M goals and strategies commensurate with the patient's needs, and increase the patient's self-efficacy to achieve those goals. The purpose of this paper is to describe the application of intervention mapping (IM) to develop, implement, and formatively evaluate the clinic-based MINDSET prototype and in developing implementation and evaluation plans. Deliverables comprised a logic model of the problem (IM Step 1); matrices of program objectives (IM Step 2); a program planning document comprising scope, sequence, theory-based methods, and practical strategies (IM Step 3); a functional MINDSET program prototype (IM Step 4); plans for implementation (IM Step 5); and evaluation (IM Step 6). IM provided a logical and systematic approach to developing and evaluating clinic-based decision support toward epilepsy S-M.
2007-07-01
waste, or solid waste management would be expected with implementation of the no-action alternative. Soils and Water. Impacts to soils and water...resources would be negligible. Construction would disturb about 2.5 acres, but best management practices such as silt fencing and soil surface watering...Intergovernmental Coordination for Environmental Planning tpy U.S. tons per year United States IWMP Integrated Waste Management Plan USACE United States
Integrated ocean management as a strategy to meet rapid climate change: the Norwegian case.
Hoel, Alf Håkon; Olsen, Erik
2012-02-01
The prospects of rapid climate change and the potential existence of tipping points in marine ecosystems where nonlinear change may result from them being overstepped, raises the question of strategies for coping with ecosystem change. There is broad agreement that the combined forces of climate change, pollution and increasing economic activities necessitates more comprehensive approaches to oceans management, centering on the concept of ecosystem-based oceans management. This article addresses the Norwegian experience in introducing integrated, ecosystem-based oceans management, emphasizing how climate change, seen as a major long-term driver of change in ecosystems, is addressed in management plans. Understanding the direct effects of climate variability and change on ecosystems and indirect effects on human activities is essential for adaptive planning to be useful in the long-term management of the marine environment.
36 CFR 219.11 - Timber requirements based on the NFMA.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Timber requirements based on the NFMA. 219.11 Section 219.11 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.11 Timber requirements based on the...
36 CFR 219.11 - Timber requirements based on the NFMA.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Timber requirements based on the NFMA. 219.11 Section 219.11 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.11 Timber requirements based on the...
36 CFR 219.11 - Timber requirements based on the NFMA.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Timber requirements based on the NFMA. 219.11 Section 219.11 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.11 Timber requirements based on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... acres of pine stands using a variety of methods to treat MPB infested stands, reduce the overall density... actions proposed are in direct response to management direction provided by the Black Hills National Forest Land and Resource Management Plan (Forest Plan). The site specific actions are designed, based on...
An alternate property tax program requiring a forest management plan and scheduled harvesting
D.F. Dennis; P.E. Sendak
1991-01-01
Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...
Interagency Communication and Collaboration on School Crisis Response Planning and Management
ERIC Educational Resources Information Center
Skavdahl, Britta M.
2010-01-01
Purpose. The purpose of this study was to determine what research-based and federally recommended practices in the area of school crisis response planning and management were being implemented in K-8 school districts in Northern California, as well as the degree with which the recommended practices were being implemented. Finally, the study…
1991-07-30
4 Management reviews, engineering and WBS -Spiral 0 -5 *Risk Management Planning -Spiral 0-5 ,41.- Unrelsi ugt .Proper initial planning -Spiral 0.1...Reusability issues for trusted systems are associated closely with maintenance issues. Reuse theory and practice for highly trusted systems will require
USDA-ARS?s Scientific Manuscript database
This paper presents a new GIS-based Best Management Practice (BMP) Tool developed for watershed managers to assist in the decision making process by simulating various scenarios using various combinations of Best Management Practices (BMPs). The development of this BMPTool is based on the integratio...
NASA Astrophysics Data System (ADS)
Bereskie, Ty; Rodriguez, Manuel J.; Sadiq, Rehan
2017-08-01
Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.
Bereskie, Ty; Rodriguez, Manuel J; Sadiq, Rehan
2017-08-01
Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.
Planning and managing future space facility projects. [management by objectives and group dynamics
NASA Technical Reports Server (NTRS)
Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.
1979-01-01
To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.
Zorpas, Antonis A; Lasaridi, Katia; Voukkali, Irene; Loizia, Pantelitsa; Chroni, Christina
2015-04-01
Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impact on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes. Copyright © 2015 Elsevier Ltd. All rights reserved.
A Teacher's Guide to Individualizing Reading.
ERIC Educational Resources Information Center
Utah System Approach to Individualized Learning Project.
The objective of this teaching guide is to provide a comprehensive system for individualizing reading instruction through planning, organization, management, and skillful teaching. The planning stage involves establishing goals, reality bases, work bases and flows, and review, evaluation, and revision. The organization of program content involves…
NASA Technical Reports Server (NTRS)
Mckay, Charles
1991-01-01
This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.
Strategic planning for aircraft noise route impact analysis: A three dimensional approach
NASA Technical Reports Server (NTRS)
Bragdon, C. R.; Rowan, M. J.; Ahuja, K. K.
1993-01-01
The strategic routing of aircraft through navigable and controlled airspace to minimize adverse noise impact over sensitive areas is critical in the proper management and planning of the U.S. based airport system. A major objective of this phase of research is to identify, inventory, characterize, and analyze the various environmental, land planning, and regulatory data bases, along with potential three dimensional software and hardware systems that can be potentially applied for an impact assessment of any existing or planned air route. There are eight data bases that have to be assembled and developed in order to develop three dimensional aircraft route impact methodology. These data bases which cover geographical information systems, sound metrics, land use, airspace operational control measures, federal regulations and advisories, census data, and environmental attributes have been examined and aggregated. A three dimensional format is necessary for planning, analyzing space and possible noise impact, and formulating potential resolutions. The need to develop this three dimensional approach is essential due to the finite capacity of airspace for managing and planning a route system, including airport facilities. It appears that these data bases can be integrated effectively into a strategic aircraft noise routing system which should be developed as soon as possible, as part of a proactive plan applied to our FAA controlled navigable airspace for the United States.
Managing Uncertainty: Thinking and Planning Strategically.
ERIC Educational Resources Information Center
Lorenzo, Albert L.
1993-01-01
Argues that rapid change and tight resources demand reality-based planning, rather than planning models that ignore internal and external customers or emphasize process over product. Describes the Strategic Guidance Model (SGM) which provides colleges with strategic visioning, organizational assessment, environmental scanning, quality improvement,…
Water Management Planning: A Case Study at Blue Grass Army Depot
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Mcmordie, Katherine
2006-04-03
Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guid¬ance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to “reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Manage¬ment Practices (BMPs).” The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky.more » In accordance with this plan, BGAD must: • Incorporate the plan as a component of the Installation energy conservation plan • Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs • Put into practice all applicable O&M options • Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) • Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.« less
Integrated Natural Resources Management Plan Grand Forks Air Force Base, North Dakota. 2004-2008
2005-12-01
5-37 5.7 Integrated Pest Management...5-44 5.7.3 Animal Pest Control...mph MSL 2005 INRMP Update 319th Civil Engineer Squadron/Environmental Management Automated Civil Engineer System Project Management Air Combat
Future directions: Integrated resource planning
NASA Astrophysics Data System (ADS)
Bauer, D. C.; Eto, J.
Integrated resource planning or IRP is the process for integrating supply- and demand-side resources to provide energy services at a cost that balances the interests of all stakeholders. It now is the resource planning process used by electric utilities in over 30 states. The goals of IRP have evolved from least cost planning and encouragement of demand-side management to broader, more complex issues including core competitive business activity, risk management and sharing, accounting for externalities, and fuel switching between gas and electricity. IRP processes are being extended to other interior regions of the country, to non-investor owned utilities, and to regional (rather than individual utility) planning bases, and to other fuels (natural gas). The comprehensive, multi-valued, and public reasoning characteristics of IRP could be extended to applications beyond energy, e.g., transportation, surface water management, and health care in ways suggested.
77 FR 21161 - National Forest System Land Management Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-09
... ecosystem services and multiple uses. The planning rule is designed to ensure that plans provide for the... adaptive and science-based, engages the public, and is designed to be efficient, effective, and within the..., the new rule is designed to make planning more efficient and effective. Purpose and Need for the New...
ERIC Educational Resources Information Center
Byrd, Terry Anthony; And Others
1992-01-01
Discusses planning for information technology (IT) in state government and reports on the IT planning experiences of eight state agencies in Florida. Florida's Information Resource Commission is described, the information resources management (IRM) planning process is explained, and recommendations for IRM for other states are given. (20…
Central Office and Site-Based Management: An Educator's Guide.
ERIC Educational Resources Information Center
Sewall, Angela Maynard
This book describes changes that must be made in central-office administration to facilitate the movement to site-based management. It is intended for educational administrators in central administration or for those who are planning to work as superintendents, business managers, or supervisors of curriculum and instruction. The book covers all…
Total Water Management: A Watershed Based Approach
In this urbanizing world, municipal water managers need to develop planning and management frameworks to meet challenges such as limiting fresh water supplies, degrading receiving waters, increasing regulatory requirements, flooding, aging infrastructure, rising utility (energy) ...
Total Water Management: A Watershed Based Approach - slides
ABSTRACT In this urbanizing world, municipal water managers need to develop planning and management frameworks to meet challenges such as limiting fresh water supplies, degrading receiving waters, increasing regulatory requirements, flooding, aging infrastructure, rising utility...
Factors affecting strategic plan implementation using interpretive structural modeling (ISM).
Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba
2018-06-11
Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.
Management strategies in hospitals: scenario planning
Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph
2015-01-01
Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735
Starting a research data management program based in a university library.
Henderson, Margaret E; Knott, Teresa L
2015-01-01
As the need for research data management grows, many libraries are considering adding data services to help with the research mission of their institution. The Virginia Commonwealth University (VCU) Libraries created a position and hired a director of research data management in September 2013. The position was new to the libraries and the university. With the backing of the library administration, a plan for building relationships with VCU faculty, researchers, students, service and resource providers, including grant administrators, was developed to educate and engage the community in data management plan writing and research data management training.
Starting a Research Data Management Program Based in a University Library
Henderson, Margaret E.; Knott, Teresa L.
2015-01-01
As the need for research data management grows, many libraries are considering adding data services to help with the research mission of their institution. The VCU Libraries created a position and hired a director of research data management in September 2013. The position was new to the libraries and the university. With the backing of the library administration, a plan for building relationships with VCU faculty, researchers, students, service and resource providers, including grant administrators, was developed to educate and engage the community in data management plan writing and research data management training. PMID:25611440
Maya Quinones; William Gould; Carlos D. Rodriguez-Pedraza
2007-01-01
This report documents the type and source of geospatial data available for Haiti. It was compiled to serve as a resource for geographic information system (GIS)-based land management and planning. It will be useful for conservation planning, reforestation efforts, and agricultural extension projects. Our study indicates that there is a great deal of geospatial...
Planning and programing in the soil conservation service
NASA Technical Reports Server (NTRS)
Gray, R. M.
1972-01-01
The historical base is presented for the framework plan for soil conservation. Conservation effects, resource management systems, and accomplishments, activities, and costs of the Soil Conservation Service are discussed.
Mississippi Curriculum Framework for Family Dynamics. Secondary Programs.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family dynamics. The course uses skills in critical thinking, decision…
Acadia National Park Climate Change Scenario Planning Workshop summary
Star, Jonathan; Fisichelli, Nicholas; Bryan, Alexander; Babson, Amanda; Cole-Will, Rebecca; Miller-Rushing, Abraham J.
2016-01-01
This report summarizes outcomes from a two-day scenario planning workshop for Acadia National Park, Maine (ACAD). The primary objective of the workshop was to help ACAD senior leadership make management and planning decisions based on up-to-date climate science and assessments of future uncertainty. The workshop was also designed as a training program, helping build participants' capabilities to develop and use scenarios. The details of the workshop are given in later sections. The climate scenarios presented here are based on published global climate model output. The scenario implications for resources and management decisions are based on expert knowledge distilled through scientist-manager interaction during workgroup break-out sessions at the workshop. Thus, the descriptions below are from these small-group discussions in a workshop setting and should not be taken as vetted research statements of responses to the climate scenarios, but rather as insights and examinations of possible futures (Martin et al. 2011, McBride et al. 2012).
Emergency planning and management in health care: priority research topics.
Boyd, Alan; Chambers, Naomi; French, Simon; Shaw, Duncan; King, Russell; Whitehead, Alison
2014-06-01
Many major incidents have significant impacts on people's health, placing additional demands on health-care organisations. The main aim of this paper is to suggest a prioritised agenda for organisational and management research on emergency planning and management relevant to U.K. health care, based on a scoping study. A secondary aim is to enhance knowledge and understanding of health-care emergency planning among the wider research community, by highlighting key issues and perspectives on the subject and presenting a conceptual model. The study findings have much in common with those of previous U.S.-focused scoping reviews, and with a recent U.K.-based review, confirming the relative paucity of U.K.-based research. No individual research topic scored highly on all of the key measures identified, with communities and organisations appearing to differ about which topics are the most important. Four broad research priorities are suggested: the affected public; inter- and intra-organisational collaboration; preparing responders and their organisations; and prioritisation and decision making.
Application of a risk management system to improve drinking water safety.
Jayaratne, Asoka
2008-12-01
The use of a comprehensive risk management framework is considered a very effective means of managing water quality risks. There are many risk-based systems available to water utilities such as ISO 9001 and Hazard Analysis and Critical Control Point (HACCP). In 2004, the World Health Organization's (WHO) Guidelines for Drinking Water Quality recommended the use of preventive risk management approaches to manage water quality risks. This paper describes the framework adopted by Yarra Valley Water for the development of its Drinking Water Quality Risk Management Plan incorporating HACCP and ISO 9001 systems and demonstrates benefits of Water Safety Plans such as HACCP. Copyright IWA Publishing 2008.
A Web-based Tool for Transparent, Collaborative Urban Water System Planning for Monterrey, Mexico
NASA Astrophysics Data System (ADS)
Rheinheimer, D. E.; Medellin-Azuara, J.; Garza Díaz, L. E.; Ramírez, A. I.
2017-12-01
Recent rapid advances in web technologies and cloud computing show great promise for facilitating collaboration and transparency in water planning efforts. Water resources planning is increasingly in the context of a rapidly urbanizing world, particularly in developing countries. In such countries with democratic traditions, the degree of transparency and collaboration in water planning can mean the difference between success and failure of water planning efforts. This is exemplified in the city of Monterrey, Mexico, where an effort to build a new long-distance aqueduct to increase water supply to the city dramatically failed due to lack of transparency and top-down planning. To help address, we used a new, web-based water system modeling platform, called OpenAgua, to develop a prototype decision support system for water planning in Monterrey. OpenAgua is designed to promote transparency and collaboration, as well as provide strong, cloud-based, water system modeling capabilities. We developed and assessed five water management options intended to increase water supply yield and/or reliability, a dominant water management concern in Latin America generally: 1) a new long-distance source (the previously-rejected project), 2) a new nearby reservoir, 3) expansion/re-operation of an existing major canal, 4) desalination, and 5) industrial water reuse. Using the integrated modeling and analytic capabilities of OpenAgua, and some customization, we assessed the performance of these options for water supply yield and reliability to help identify the most promising ones. In presenting this assessment, we demonstrate the viability of using online, cloud-based modeling systems for improving transparency and collaboration in decision making, reducing the gap between citizens, policy makers and water managers, and future directions.
NASA Astrophysics Data System (ADS)
Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles
2015-04-01
In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.
Lukersmith, Sue; Fernandez, Ana; Millington, Michael; Salvador-Carulla, Luis
2016-04-01
Case management is a complex intervention. Complexity arises from the interaction of different components: the model (theoretical basis), implementation context (service), population and health condition, focus for the intervention (client and/or their family), case manager's actions (interventions) and the target of case management (integrated care and support, client's community participation). There is a lack of understanding and a common language. To our knowledge there is no classification (taxonomy) for community-based case management. To develop a community-based case management in brain injury taxonomy (BICM-T), as a common language and understanding of case management for use in quality analysis, policy, planning and practice. The mixed qualitative methods used multiple sources of knowledge including scoping, framing and a nominal group technique to iteratively develop the Beta version (draft) of the taxonomy. A two part developmental evaluation involving case studies and mapping to international frameworks assessed the applicability and acceptability (feasibility) before finalization of the BICM-T. The BICM-T includes a definition of community-based case management, taxonomy trees, tables and a glossary. The interventions domain tree has 9 main actions (parent category): engagement, holistic assessment, planning, education, training and skills development, emotional and motivational support, advising, coordination, monitoring; 17 linked actions (children category); 8 related actions; 63 relevant terms defined in the glossary. The BICM-T provides a knowledge map with the definitions and relationships between the core actions (interventions domain). Use of the taxonomy as a common language will benefit practice, quality analysis, evaluation, policy, planning and resource allocation. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
A Vision for the Future: Site-Based Strategic Planning.
ERIC Educational Resources Information Center
Herman, Jerry J.
1989-01-01
Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…
Library Statistical Data Base Formats and Definitions.
ERIC Educational Resources Information Center
Jones, Dennis; And Others
Represented are the detailed set of data structures relevant to the categorization of information, terminology, and definitions employed in the design of the library statistical data base. The data base, or management information system, provides administrators with a framework of information and standardized data for library management, planning,…
76 FR 17383 - Pacific Fishery Management Council; Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... Pacific Fishery Management Council (Pacific Council) will convene meetings of the Ecosystem-Based Management Subcommittee (Subcommittee) of the Scientific and Statistical Committee and the Ecosystem Advisory... recommendations to the Council on the development of an Ecosystem Fishery Management Plan (EFMP). The Subcommittee...
[Occupational health protection in business economics--business plan for health intervention].
Rydlewska-Liszkowska, Izabela
2011-01-01
One of the company's actions for strengthening human capital is the protection of health and safety of its employees. Its implementation needs financial resources, therefore, employers expect tangible effectiveness in terms of health and economics. Business plan as an element of company planning can be a helpful tool for new health interventions management. The aim of this work was to elaborate a business plan framework for occupational health interventions at the company level, combining occupational health practices with company management and economics. The business plan of occupational health interventions was based on the literature review, the author's own research projects and meta-analysis of research reports on economic relations between occupational health status and company productivity. The study resulted in the development of the business plan for occupational health interventions at the company level. It consists of summary and several sections that address such issues as the key elements of the intervention discussed against a background of the company economics and management, occupational health and safety status of the staff, employees' health care organization, organizational plan of providing the employees with health protection, marketing plan, including specificity of health interventions in the company marketing plan and financial plan, reflecting the economic effects of health care interventions on the overall financial management of the company. Business plan defines occupational health and safety interventions as a part of the company activities as a whole. Planning health care interventions without relating them to the statutory goals of the company may have the adverse impact on the financial balance and profitability of the company. Therefore, business plan by providing the opportunity of comparing different options of occupational health interventions to be implemented by employers is a key element of the management of employees' health.
NASA Astrophysics Data System (ADS)
Bremer, Leah L.; Delevaux, Jade M. S.; Leary, James J. K.; J. Cox, Linda; Oleson, Kirsten L. L.
2015-04-01
Incorporating ecosystem services into management decisions is a promising means to link conservation and human well-being. Nonetheless, planning and management in Hawai`i, a state with highly valued natural capital, has yet to broadly utilize an ecosystem service approach. We conducted a stakeholder assessment, based on semi-structured interviews, with terrestrial ( n = 26) and marine ( n = 27) natural resource managers across the State of Hawai`i to understand the current use of ecosystem services (ES) knowledge and decision support tools and whether, how, and under what contexts, further development would potentially be useful. We found that ES knowledge and tools customized to Hawai`i could be useful for communication and outreach, justifying management decisions, and spatial planning. Greater incorporation of this approach is clearly desired and has a strong potential to contribute to more sustainable decision making and planning in Hawai`i and other oceanic island systems. However, the unique biophysical, socio-economic, and cultural context of Hawai`i, and other island systems, will require substantial adaptation of existing ES tools. Based on our findings, we identified four key opportunities for the use of ES knowledge and tools in Hawai`i: (1) linking native forest protection to watershed health; (2) supporting sustainable agriculture; (3) facilitating ridge-to-reef management; and (4) supporting statewide terrestrial and marine spatial planning. Given the interest expressed by natural resource managers, we envision broad adoption of ES knowledge and decision support tools if knowledge and tools are tailored to the Hawaiian context and coupled with adequate outreach and training.
Bremer, Leah L; Delevaux, Jade M S; Leary, James J K; J Cox, Linda; Oleson, Kirsten L L
2015-04-01
Incorporating ecosystem services into management decisions is a promising means to link conservation and human well-being. Nonetheless, planning and management in Hawai'i, a state with highly valued natural capital, has yet to broadly utilize an ecosystem service approach. We conducted a stakeholder assessment, based on semi-structured interviews, with terrestrial (n = 26) and marine (n = 27) natural resource managers across the State of Hawai'i to understand the current use of ecosystem services (ES) knowledge and decision support tools and whether, how, and under what contexts, further development would potentially be useful. We found that ES knowledge and tools customized to Hawai'i could be useful for communication and outreach, justifying management decisions, and spatial planning. Greater incorporation of this approach is clearly desired and has a strong potential to contribute to more sustainable decision making and planning in Hawai'i and other oceanic island systems. However, the unique biophysical, socio-economic, and cultural context of Hawai'i, and other island systems, will require substantial adaptation of existing ES tools. Based on our findings, we identified four key opportunities for the use of ES knowledge and tools in Hawai'i: (1) linking native forest protection to watershed health; (2) supporting sustainable agriculture; (3) facilitating ridge-to-reef management; and (4) supporting statewide terrestrial and marine spatial planning. Given the interest expressed by natural resource managers, we envision broad adoption of ES knowledge and decision support tools if knowledge and tools are tailored to the Hawaiian context and coupled with adequate outreach and training.
Planning to Execution Earned Value Risk Management Tool
2015-09-01
Experiments ............................................................24 b. Result Analysis ...31 B. STAKEHOLDER ANALYSIS .....................................................................33 C. OPERATIONAL-BASED SCENARIO...42 c. Simulation and Analysis Activity ............................................43 2. Project Management Phase
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
Li, Qing-na; Huang, Xiu-ling; Gao, Rui; Lu, Fang
2012-08-01
Data management has significant impact on the quality control of clinical studies. Every clinical study should have a data management plan to provide overall work instructions and ensure that all of these tasks are completed according to the Good Clinical Data Management Practice (GCDMP). Meanwhile, the data management plan (DMP) is an auditable document requested by regulatory inspectors and must be written in a manner that is realistic and of high quality. The significance of DMP, the minimum standards and the best practices provided by GCDMP, the main contents of DMP based on electronic data capture (EDC) and some key factors of DMP influencing the quality of clinical study were elaborated in this paper. Specifically, DMP generally consists of 15 parts, namely, the approval page, the protocol summary, role and training, timelines, database design, creation, maintenance and security, data entry, data validation, quality control and quality assurance, the management of external data, serious adverse event data reconciliation, coding, database lock, data management reports, the communication plan and the abbreviated terms. Among them, the following three parts are regarded as the key factors: designing a standardized database of the clinical study, entering data in time and cleansing data efficiently. In the last part of this article, the authors also analyzed the problems in clinical research of traditional Chinese medicine using the EDC system and put forward some suggestions for improvement.
Site-Based Management in Education: Rochester City School District Case Study.
ERIC Educational Resources Information Center
Gross, Alan
This paper describes outcomes of a partnership between the Rochester City School District (New York) and the Kodak 21st Century Learning Challenge consulting program for improving school-based planning team (S-BPT) operations. The purpose of the school-based planning team is to involve the entire school community in improving school effectiveness.…
Remote-sensing applications as utilized in Florida's coastal zone management program
NASA Technical Reports Server (NTRS)
Worley, D. R.
1975-01-01
Land use maps were developed from photomaps obtained by remote sensing in order to develop a comprehensive state plan for the protection, development, and zoning of coastal regions. Only photographic remote sensors have been used in support of the coastal council's planning/management methodology. Standard photointerpretation and cartographic application procedures for map compilation were used in preparing base maps.
Daniel K. Rosenberg; Raymond J. Davis; Kelli J. Van Norman; Jeffrey R. Dunk; Eric D. Forsman; Robert D. Huff
2016-01-01
Environmental regulations often require wildlife surveys prior to habitat disturbance to avoid impacts or as the basis for planning mitigation, yet project-level surveys may not provide the insights needed to guide long-term management. Management of the red tree vole (Arborimus longicaudus) has largely been based on such surveys. As an alternative...
U.S. Forest Service Leads Climate Change Adaptation in the Western United States
NASA Astrophysics Data System (ADS)
Halofsky, J.; Peterson, D. L.
2014-12-01
Effective climate change engagement on public lands is characterized by (1) an enduring science-management partnership, (2) involvement of key stakeholders, (3) consideration of broad landscapes with multiple landowners, (4) science-based, peer-reviewed assessments of sensitivity of natural resources to climate change, (5) adaptation strategies and tactics developed by resource managers, (6) leadership and a workforce motivated to implement climate-smart practices in resource planning and project management. Using this approach, the U.S. Forest Service, in partnership with other organizations, has developed climate change vulnerability assessments and adaptation plans for diverse ecosystems and multiple resources in national forests and other lands in the western United States, although implementation (step 6) has been slow in some cases. Hundreds of meetings, strategies, plans, and panels have focused on climate change adaptation over the past decade, but only direct engagement between scientists and resource managers (less research, less planning, more action) has resulted in substantive outcomes and increased organizational capacity for climate-smart management.
NASA Astrophysics Data System (ADS)
Kong, X. M.; Huang, G. H.; Fan, Y. R.; Li, Y. P.
2016-04-01
In this study, a duality theorem-based algorithm (DTA) for inexact quadratic programming (IQP) is developed for municipal solid waste (MSW) management under uncertainty. It improves upon the existing numerical solution method for IQP problems. The comparison between DTA and derivative algorithm (DAM) shows that the DTA method provides better solutions than DAM with lower computational complexity. It is not necessary to identify the uncertain relationship between the objective function and decision variables, which is required for the solution process of DAM. The developed method is applied to a case study of MSW management and planning. The results indicate that reasonable solutions have been generated for supporting long-term MSW management and planning. They could provide more information as well as enable managers to make better decisions to identify desired MSW management policies in association with minimized cost under uncertainty.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Two-year outcome of team-based intensive case management for patients with schizophrenia.
Aberg-Wistedt, A; Cressell, T; Lidberg, Y; Liljenberg, B; Osby, U
1995-12-01
Two-year outcomes of patients with schizophrenic disorders who were assigned to an intensive, team-based case management program and patients who received standard psychiatric services were assessed. The case management model featured increased staff contact time with patients, rehabilitation plans based on patients' expressed needs, and patients' attendance at team meetings where their rehabilitation plan was discussed. Forty patients were randomly assigned to either the case management group or the control group that received standard services. Patients' use of emergency and inpatient services, their quality of life, the size of their social networks, and their relatives' burden of care were assessed at assignment to the study groups and at two-year follow-up. Patients in the case management group had significantly fewer emergency visits compared with the two years before the study, and their relatives reported significantly reduced burden of care associated with relationships with psychiatric services over the two-year period. The size of patients' social networks increased for the case management group and decreased for the control group. A team-based intensive case management model is an effective intervention in the rehabilitation of patients with chronic schizophrenia.
[New professional field in France: Analysis of the training needs of case managers].
Somme, Dominique; Corvol, Aline; Couturier, Yves; Pimouguet, Clément; Moreau, Olivier; Perivier, Samuel; Balard, Frédéric; de Stampa, Matthieu
2015-01-01
Case management is a relatively new career field in France. It was first introduced on an experimental basis in 2007-2008, and was then developedfollowing the National Alzheimer Plan and finally enshrined in legislation in 2012. This careerfield is based on a set of tasks widely described internationally: identifying the right level of intervention, standardized multidimensional assessment, planning all aid (care and social services), implementation of the plan, monitoring and reassessment and periodic reassessment of all needs in a continuous and long-term process. The specific, systematic and dedicated nature of these tasks to these tasks makes training essential. Regulations also stipulate that the professional must acquire additional training by a dedicated inter-university degree. This requirement is a French specificity The authors present the history of case management and training in France and analyze the various international training frameworks identified by an Internet search. Moreover, based on the opinions expressed by case managers at different times of the scientific assessment and a review ofseveral studies conducted by inter-university case management program students, this article highlights the specific training needs of case managers and how the proposed training can meet these needs.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses to prepare Mississippi vocational students for…
ERIC Educational Resources Information Center
Rothwell, William J.; Cookson, Peter S.
This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…
Li, Y P; Huang, G H
2010-09-15
Considerable public concerns have been raised in the past decades since a large amount of pollutant emissions from municipal solid waste (MSW) disposal of processes pose risks on surrounding environment and human health. Moreover, in MSW management, various uncertainties exist in the related costs, impact factors and objectives, which can affect the optimization processes and the decision schemes generated. In this study, an interval-based possibilistic programming (IBPP) method is developed for planning the MSW management with minimized system cost and environmental impact under uncertainty. The developed method can deal with uncertainties expressed as interval values and fuzzy sets in the left- and right-hand sides of constraints and objective function. An interactive algorithm is provided for solving the IBPP problem, which does not lead to more complicated intermediate submodels and has a relatively low computational requirement. The developed model is applied to a case study of planning a MSW management system, where mixed integer linear programming (MILP) technique is introduced into the IBPP framework to facilitate dynamic analysis for decisions of timing, sizing and siting in terms of capacity expansion for waste-management facilities. Three cases based on different waste-management policies are examined. The results obtained indicate that inclusion of environmental impacts in the optimization model can change the traditional waste-allocation pattern merely based on the economic-oriented planning approach. The results obtained can help identify desired alternatives for managing MSW, which has advantages in providing compromised schemes under an integrated consideration of economic efficiency and environmental impact under uncertainty. Copyright 2010 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green,T.
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policymore » for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.« less
NASA Technical Reports Server (NTRS)
Maiocco, F. R.; Hume, J. P.
1976-01-01
A system's approach is outlined in the paper to assist facility and Plant Engineers improve their organization's data management system. The six basic steps identified may appear somewhat simple; however, adequate planning, proper resources, and the involvement of management will determine the success of a computerized facility management data base. Helpful suggestions are noted throughout the paper to insure the development of a practical computerized data management system.
Dengue Contingency Planning: From Research to Policy and Practice.
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini
2016-09-01
Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.
Modified allocation capacitated planning model in blood supply chain management
NASA Astrophysics Data System (ADS)
Mansur, A.; Vanany, I.; Arvitrida, N. I.
2018-04-01
Blood supply chain management (BSCM) is a complex process management that involves many cooperating stakeholders. BSCM involves four echelon processes, which are blood collection or procurement, production, inventory, and distribution. This research develops an optimization model of blood distribution planning. The efficiency of decentralization and centralization policies in a blood distribution chain are compared, by optimizing the amount of blood delivered from a blood center to a blood bank. This model is developed based on allocation problem of capacitated planning model. At the first stage, the capacity and the cost of transportation are considered to create an initial capacitated planning model. Then, the inventory holding and shortage costs are added to the model. These additional parameters of inventory costs lead the model to be more realistic and accurate.
Strategic plan : our guide to the future
DOT National Transportation Integrated Search
1997-01-01
The Federal Aviation Administration Logistics Center's strategic plan provides a direction for the future based on analysis of factors affecting current Logistics Center business operations. The FAA Logistics Center management team analyzed the curre...
Kilbourne, Amy M; Nord, Kristina M; Kyle, Julia; Van Poppelen, Celeste; Goodrich, David E; Kim, Hyungjin Myra; Eisenberg, Daniel; Un, Hyong; Bauer, Mark S
2014-01-01
Mood disorders represent the most expensive mental disorders for employer-based commercial health plans. Collaborative care models are effective in treating chronic physical and mental illnesses at little to no net healthcare cost, but to date have primarily been implemented by larger healthcare organizations in facility-based models. The majority of practices providing commercially insured care are far too small to implement such models. Health plan-level collaborative care treatment can address this unmet need. The goal of this study is to implement at the national commercial health plan level a collaborative care model to improve outcomes for persons with mood disorders. A randomized controlled trial of a collaborative care model versus usual care will be conducted among beneficiaries of a large national health plan from across the country seen by primary care or behavioral health practices. At discharge 344 patients identified by health plan claims as hospitalized for unipolar depression or bipolar disorder will be randomized to receive collaborative care (patient phone-based self-management support, care management, and guideline dissemination to practices delivered by a plan-level care manager) or usual care from their provider. Primary outcomes are changes in mood symptoms and mental health-related quality of life at 12 months. Secondary outcomes include rehospitalization, receipt of guideline-concordant care, and work productivity. This study will determine whether a collaborative care model for mood disorders delivered at the national health plan level improves outcomes compared to usual care, and will inform a business case for collaborative care models for these settings that can reach patients wherever they receive treatment. ClinicalTrials.gov Identifier: NCT02041962; registered January 3, 2014.
Resource Management in the Microgravity Science Division
NASA Technical Reports Server (NTRS)
Casselle, Justine
2004-01-01
In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.
Arrival metering fuel consumption analysis
DOT National Transportation Integrated Search
2011-01-01
Arrival metering is a method of time-based traffic management that is used by the Federal Aviation Administration to plan and manage streams of arrival traffic during periods of : high demand at busy airports. The Traffic Management Advisor is an aut...
An Approach to Meeting Managements Needs for Financial Information
ERIC Educational Resources Information Center
Norberg, Douglas; Spilka, Leonard S.
1973-01-01
A discussion of the Automated Management Planning and Controls System (AMPACS) that is being designed for public television stations in order to provide much needed timely and complete information upon which management can base its decisions. (Author/HB)
Azorbo, S; Muna, C
1993-01-01
The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
7 CFR 4280.42 - Application evaluation and selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Project plans, its management, and, if applicable, its products and operating plans. (The business plan...) Nature of the Project. Rural Development will award up to 60 points based on whether the Project: (i) Is... connection project (such as streets or utilities)—20 points; (ii) Provides Technical Assistance to rural...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
Nurse-Managed Clinics: A Blueprint for Success Using the Covey Framework.
ERIC Educational Resources Information Center
Starck, Patricia L.; And Others
1995-01-01
Describes the process from inception to successful operation of a university-based, nurse-managed clinic, based on Covey's seven habits of highly effective people. Includes information on the planning process, financing, political strategies for gaining approval, and ongoing development of services. (JOW)
Have Your Computer Call My Computer.
ERIC Educational Resources Information Center
Carabi, Peter
1992-01-01
As more school systems adopt site-based management, local decision makers need greater access to all kinds of information. Microcomputer-based networks can help with classroom management, scheduling, student program design, counselor recommendations, and financial reporting operations. Administrators are provided with planning tips and a sample…
Leadership succession planning: an evidence-based approach for managing the future.
Redman, Richard W
2006-06-01
Leadership succession planning is a key business strategy to help organizational leaders deal effectively with the future. Evidence from industry provides a variety of best practices that can ensure that a pipeline of leaders will be available when they are needed. The author addresses the essential needs that individuals face when developing a cadre of available leaders prepared for managing an uncertain future.
Corrosion Prevention and Control Planning Guidebook Spiral 3
2007-09-01
programs. 5. Develop and recommend corrective and preventive procedures based on reliability and maintainability analyses of field data on similar in...One of the many challenges facing the Program/Acquisition Managers is the ability to develop a meaningful Corrosion Prevention and Control Plan...designated program manager of all activities associated with the acquisition, development , production, fielding , sustainment, and disposal of a DoD weapon
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
The integrated rangeland fire management strategy actionable science plan
Aldridge, Cameron L.; Berg, Ken; Boyd, Chad S.; Boyte, Stephen P.; Bradford, John B.; Brunson, Ed; Cissel, John H.; Conway, Courtney J.; Chalfoun, Anna D.; Chambers, Jeanne C.; Clark, Patrick; Coates, Peter S.; Crist, Michele R.; Davis, Dawn M.; DeCrappeo, Nicole; Deibert, Patricia A.; Doherty, Kevin E.; Evers, Louisa B.; Finch, Deborah M.; Finn, Sean P.; Germino, Matthew J.; Glenn, Nancy F.; Gucker, Corey; Hall, John A.; Hanser, Steven E.; Havlina, Douglas W.; Heinrichs, Julie; Heller, Matt; Homer, Collin G.; Hunter, Molly E.; Jacobs, Ruth W.; Karl, Jason W.; Kearney, Richard; Kemp, Susan K; Kilkenny, Francis F.; Knick, Steven T.; Launchbaugh, Karen; Manier, Daniel J.; Mayer, Kenneth E.; Meyer, Susan E.; Monroe, Adrian; MontBlanc, Eugénie; Newingham, Beth A.; Pellant, Michael L.; Phillips, Susan L.; Pilliod, David S.; Ricca, Mark A.; Richardson, Bryce A.; Rose, Jeffrey A.; Shaw, Nancy; Sheley, Roger L.; Shinneman, Douglas J.; Wiechman , Lief A.; Wylie, Bruce K.
2016-01-01
The Integrated Rangeland Fire Management Strategy (hereafter Strategy, DOI 2015) outlined the need for coordinated, science-based adaptive management to achieve long-term protection, conservation, and restoration of the sagebrush (Artemisia spp.) ecosystem. A key component of this management approach is the identification of knowledge gaps that limit implementation of effective strategies to meet current management challenges. The tasks and actions identified in the Strategy address several broad topics related to management of the sagebrush ecosystem. This science plan is organized around these topics and specifically focuses on fire, invasive plant species and their effects on altering fire regimes, restoration, sagebrush and greater sage-grouse (Centrocercus urophasianus), and climate and weather.
He, Ji; Dai, Xinbin; Zhao, Xuechun
2007-02-09
BLAST searches are widely used for sequence alignment. The search results are commonly adopted for various functional and comparative genomics tasks such as annotating unknown sequences, investigating gene models and comparing two sequence sets. Advances in sequencing technologies pose challenges for high-throughput analysis of large-scale sequence data. A number of programs and hardware solutions exist for efficient BLAST searching, but there is a lack of generic software solutions for mining and personalized management of the results. Systematically reviewing the results and identifying information of interest remains tedious and time-consuming. Personal BLAST Navigator (PLAN) is a versatile web platform that helps users to carry out various personalized pre- and post-BLAST tasks, including: (1) query and target sequence database management, (2) automated high-throughput BLAST searching, (3) indexing and searching of results, (4) filtering results online, (5) managing results of personal interest in favorite categories, (6) automated sequence annotation (such as NCBI NR and ontology-based annotation). PLAN integrates, by default, the Decypher hardware-based BLAST solution provided by Active Motif Inc. with a greatly improved efficiency over conventional BLAST software. BLAST results are visualized by spreadsheets and graphs and are full-text searchable. BLAST results and sequence annotations can be exported, in part or in full, in various formats including Microsoft Excel and FASTA. Sequences and BLAST results are organized in projects, the data publication levels of which are controlled by the registered project owners. In addition, all analytical functions are provided to public users without registration. PLAN has proved a valuable addition to the community for automated high-throughput BLAST searches, and, more importantly, for knowledge discovery, management and sharing based on sequence alignment results. The PLAN web interface is platform-independent, easily configurable and capable of comprehensive expansion, and user-intuitive. PLAN is freely available to academic users at http://bioinfo.noble.org/plan/. The source code for local deployment is provided under free license. Full support on system utilization, installation, configuration and customization are provided to academic users.
Program on State Agency Remote Sensing Data Management (SARSDM). [missouri
NASA Technical Reports Server (NTRS)
Eastwood, L. F., Jr.; Gotway, E. O.
1978-01-01
A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri.
Health plan approach to operationalizing a specialty drug management program.
Tegenu, Mesfin
2008-05-01
Expenditures related to specialty drugs consume a significant percentage of available health care resources. Explain the process of transitioning the management of specialty drugs from medical services to pharmacy services in 2 managed care plans and provide insight into the issues encountered and solutions implemented based on 6 years of experience using traditional and innovative pharmacy utilization management tools to insure appropriate specialty drug use and reimbursement. The level of involvement in a specialty management program varies from managing only products dispensed by the retail, mail, and specialty pharmacy vendor to encompassing a broad list of specialty drugs distributed through a variety of channels. Efficient administrative, operational, and clinical processes are critical to the success of the program. Additionally, an accurate and timely claims processing procedure is also essential for success as is the ability to mine data and effectively report on the use of specialty products. A clinically sound, cost-effective, and patient-friendly program requires input from health plan members, pharmacy service leaders, and physician providers, and must overcome challenges associated with disrupting current relationships and removing competing incentives. A well-constructed and properly funded specialty drug management program results in clinical and financial benefits for the plan.
Final Environmental Assessment. Physical Fitness Center Los Angeles Air Force Base
2000-10-13
Coast Air Quality Management District (SCAQMD). 1996. Final 1997 Air Qaulity Management Plan. November. South Coast Air Quality Management District...resources including land use, geology and soils, water resources, biological resources, air quality, noise, traffic and transportation, waste management ...3-8 3.8 Solid and Hazardous Waste Management and Disposal
Exploring Crisis Management in U.S. Small Businesses
NASA Astrophysics Data System (ADS)
Williams, Jon
As a critical infrastructure, the US electricity grid supplies electricity to 340 million people within eight separate regions. The power infrastructure is vulnerable to many types of disasters capable of severing supplies of electricity. The impact on the employees and communities when small- and medium-size enterprises are shut down due to disasters can be severe. The purpose of the quantitative comparative study was to explore small- and medium-size enterprises crisis management strategies in the case of power infrastructure vulnerabilities. Perceptions of small business leaders were probed about crisis management planning relevant to three secondary factors: prior experience of crises, threat perceptions, and planning self-efficacy. Participants completed an adapted questionnaire instrument based on a five-point Likert scale for six sub-factors including resilience through planning, financial impact, operational crisis management, the perfect storm, the aftermath of survival, and atrophy. The instrument also measured three additional factors to include, prior experience of crises, threat perceptions, and planning self-efficacy, across seven types of crises. The results of this study indicated that of the 276 respondents, 104 had no crisis plans, but 172 did have crisis plans. Of those who had implemented crisis plans, 19% had specific provisions to address power outages or attacks on the electrical grid. Of the respondents who had not planned for power outages nor experienced significant losses of power, a statistically significant number acknowledged an external threat to their business. The majority of respondents indicated that long-term planning was related to resilience; however, the migration of crisis understanding into the planning process or implementation was not implemented. This heightened awareness of potential crises without the corresponding development and implementation of mitigation crisis plans requires additional research to understand drivers effecting the decision making process with crisis managers.
Individual differences and day-to-day fluctuations in goal planning and type 1 diabetes management.
Wiebe, Deborah J; Baker, Ashley C; Suchy, Yana; Stump, Tammy K; Berg, Cynthia A
2018-04-26
To examine whether individual differences and day-to-day fluctuations in diabetes goal planning are associated with Type 1 diabetes (T1D) management during late adolescence, and whether lapses in daily diabetes goal planning are more disruptive to diabetes management among those with poorer executive functioning (EF). Late adolescents with T1D (N = 236, Mage = 17.77 years) completed survey measures assessing individual differences in levels of diabetes goal planning and adherence, as well as survey and performance-based measures of EF; glycemic control was assessed through glycated hemoglobin (HbA1c) assays. Participants then completed a 2-week daily diary, rating items measuring daily diabetes goal planning, goal effort, and adherence, and recording blood-glucose tests from their glucometer at the end of each day. Analyses of survey measures indicated that higher individual differences in diabetes goal planning were associated with better adherence and glycemic control. Analyses of daily data using hierarchical linear modeling indicated that adolescents displayed higher daily adherence and lower blood-glucose levels on days when they had higher-than-their-average levels of daily goal planning and daily goal effort. EF moderated the association between daily goal planning and daily adherence, indicating that lapses in daily goal planning were more disruptive for adolescents with poorer EF. Both individual differences and day-to-day fluctuations in diabetes goal planning are associated with diabetes management, highlighting the challenges of managing T1D in daily life. Youth in late adolescence with poorer EF may especially benefit from planning to attain diabetes goals on a daily basis. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
A Study of the Program Management Responsibility Transfer Process for the F-16.
1975-09-01
Guidance . . . ... 19 Subjective Criteria. .......... 21 Criteria Based on the Principles of Management ....... ........... ... 27 Planning...26 GSM/SM/75S-8 and then they will be fitted to the management structure of the two commands and IIQ USAF. Criteria Based on the Principles Of Management From...with each of these ýunc- tional areas with emphasis on some of the principles of management that are (in the writer’s opinion) important to the PMRT
Planning and design of a knowledge based system for green manufacturing management
NASA Astrophysics Data System (ADS)
Kamal Mohd Nawawi, Mohd; Mohd Zuki Nik Mohamed, Nik; Shariff Adli Aminuddin, Adam
2013-12-01
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization.
An aquatic multiscale assessment and planning framework approach—forest plan revision case study
Kerry Overton; Ann D. Carlson; Cynthia Tait
2010-01-01
The Aquatic Multiscale Assessment and Planning Framework is a Web-based decision-support tool developed to assist aquatic practitioners in managing fisheries and watershed information. This tool, or framework, was designed to assist resource assessments and planning efforts from the broad scale to the fine scale, to document procedures, and to link directly to relevant...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for metal trades I, IIA (advanced welding), and IIB (advanced machine shop).…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for horticulture I and II. Presented first are a program description and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture production I and II. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in the building trades: building trades I and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for welding I and II. Presented first are a program description and course…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriscience I and II. Presented first are a program description and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive mechanics I and II. Presented first are a program description…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for allied health I and II. Presented first are a program description and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for the introduction to agriscience program. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in electronics: electronics I and II.…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in carpentry: carpentry I and II. Presented…
Expert Opinion on Elements Required to Develop a Base Support Plan Training Guide
1989-09-01
Business: An Operating Manual. New York NY: American Management Association Inc. 1976. 18. Lippert , Fred G. "Six (?) Steps to Good Training, Supervision...46: 17--18 (June 1984). 19. Military Airlift Command. Base Reception Planning. MACR 28-6, Vol I. Scott AFB IL. 28 Octoner 1986. 20. Miller, Ernest C
NASA Astrophysics Data System (ADS)
Jing, Changfeng; Liang, Song; Ruan, Yong; Huang, Jie
2008-10-01
During the urbanization process, when facing complex requirements of city development, ever-growing urban data, rapid development of planning business and increasing planning complexity, a scalable, extensible urban planning management information system is needed urgently. PM2006 is such a system that can deal with these problems. In response to the status and problems in urban planning, the scalability and extensibility of PM2006 are introduced which can be seen as business-oriented workflow extensibility, scalability of DLL-based architecture, flexibility on platforms of GIS and database, scalability of data updating and maintenance and so on. It is verified that PM2006 system has good extensibility and scalability which can meet the requirements of all levels of administrative divisions and can adapt to ever-growing changes in urban planning business. At the end of this paper, the application of PM2006 in Urban Planning Bureau of Suzhou city is described.
NASA Astrophysics Data System (ADS)
Anthony, Brandon P.; Shestackova, Elena
2015-07-01
Driven by the underperformance of many protected areas (PAs), protected area management effectiveness (PAME) evaluations are increasingly being conducted to assess PAs in meeting specified objectives. A number of PAME tools have been developed, many of which are based on the IUCN-WCPA framework constituting six evaluative elements (context, planning, input, process, output, and outcomes). In a quest for a more universal tool and using this framework, Leverington et al. (Environ Manag 46(5):685-698, 2010) developed a common scale and list of 33 headline indicators, purported to be representative across a wide range of management effectiveness evaluation tools. The usefulness of such composite tools and the relative weighting of indicators are still being debated. Here, we utilize these headline indicators as a benchmark to assess PAME in 37 PAs of four types in Krasnoyarsk Kray, Russia, and compare these with global results. Moreover, we review the usefulness of these indicators in the Krasnoyarsk context based on the opinions of local PA management teams. Overall, uncorrected management scores for studied PAs were slightly better (mean = 5.66 ± 0.875) than the global average, with output and outcome elements being strongest, and planning and process scores lower. Score variability is influenced by PA size, location, and type. When scores were corrected based on indicator importance, the mean score significantly increased to 5.75 ± 0.858. We emphasize idiosyncrasies of Russian PA management, including the relative absence of formal management plans and limited efforts toward local community beneficiation, and how such contextual differences may confound PAME scores when indicator weights are treated equal.
Disease management: a leap of faith to lower-cost, higher-quality health care.
Short, Ashley; Mays, Glen; Mittler, Jessica
2003-10-01
With managed care's promise to reduce costs and improve quality waning, employers and health plans are exploring more targeted ways to control rapidly rising health costs. Disease management programs, which focus on patients with chronic conditions such as asthma and diabetes, are growing in popularity, according to findings from the Center for Studying Health System Change's (HSC) 2002-03 site visits to 12 nationally representative communities. In addition to condition-based disease management programs, some health plans and employers are using intensive case management services to coordinate care for high-risk patients with potentially costly and complex medical conditions. Despite high expectations, evidence of both disease management and case management programs' success in controlling costs and improving quality remains limited.
ERIC Educational Resources Information Center
Williams, Jeffery R.; Smith, Craig M.; Roe, Josh D.; Leatherman, John C.; Wilson, Robert M.
2012-01-01
"Watershed Manager" is a spreadsheet-based model that is used in extension education programs for learning about and selecting cost-effective watershed management practices to reduce soil, nitrogen, and phosphorus losses from cropland. It can facilitate Watershed Restoration and Protection Strategy (WRAPS) stakeholder groups' development…
Training Packages: The Scientific Management of Education.
ERIC Educational Resources Information Center
Hunter, John
The theory of scientific management was established as a way to increase workers' productivity. The following are among the key principles underpinning scientific management: task simplification and division of labor boost productivity; management must control the planning of work down to its minutiae; and remuneration should be based on output.…
Leadership and management curriculum planning for Iranian general practitioners.
Khosravan, Shahla; Karimi Moonaghi, Hossein; Yazdani, Shahram; Ahmadi, Soleiman; Mansoorian, Mohammad Reza
2015-10-01
Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern's curriculum planning cycle. This study was conducted in 2011- 2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured interviews with key informants to capture their experiences and viewpoints about the necessity of management courses for undergraduate medical students, goals, objectives, and educational strategies according to Kern's curriculum planning cycle. The data was used to develop a questionnaire to be used in a quantitative written survey. Results of these two phases and that of the review of medical curriculum in other countries and management curriculum of other medical disciplines in Iran were used in management and leadership curriculum planning. In the qualitative phase, purposeful sampling and content analysis with constant comparison based on Strauss and Corbin's method were used; descriptive and analytic tests were used for quantitative data by SPSS version 14. In the qualitatively stage of this research, 6 main categories including the necessity of management course, features and objectives of management curriculum, proper educational setting, educational methods and strategies, evolutionary method and feedback result were determined. In the quantitatively stage of the research, from the viewpoints of 51.6% of 126 units of research who filled out the questionnaire, ranked high necessary of management courses. The coordination of care and clinical leadership was determined as the most important role for GPs with a mean of 6.2 from sample viewpoint. Also, team working and group dynamics had the first priority related to the principles and basics of management with a mean of 3.59. Other results were shown in the paper. Results of this study indicated the need to provide educational programs for GPs; it led to a systematic curriculum theory and clinical management using Kern cycle for general practitioner's discipline. Implementation and evaluation of this program is recommended.
Zhang, Xiaodong; Huang, Gordon
2014-03-15
Waste management activities can release greenhouse gases (GHGs) to the atmosphere, intensifying global climate change. Mitigation of the associated GHG emissions is vital and should be considered within integrated municipal solid waste (MSW) management planning. In this study, a fuzzy possibilistic integer programming (FPIM) model has been developed for waste management facility expansion and waste flow allocation planning with consideration of GHG emission trading in an MSW management system. It can address the interrelationships between MSW management planning and GHG emission control. The scenario of total system GHG emission control is analyzed for reflecting the feature that GHG emission credits may be tradable. An interactive solution algorithm is used to solve the FPIM model based on the uncertainty-averse preferences of decision makers in terms of p-necessity level, which represents the certainty degree of the imprecise objective. The FPIM model has been applied to a hypothetical MSW planning problem, where optimal decision schemes for facility expansion and waste flow allocation have been achieved with consideration of GHG emission control. The results indicate that GHG emission credit trading can decrease total system cost through re-allocation of GHG emission credits within the entire MSW management system. This will be helpful for decision makers to effectively determine the allowable GHG emission permits in practices. Copyright © 2014 Elsevier Ltd. All rights reserved.
Autonomous mission management for UAVs using soar intelligent agents
NASA Astrophysics Data System (ADS)
Gunetti, Paolo; Thompson, Haydn; Dodd, Tony
2013-05-01
State-of-the-art unmanned aerial vehicles (UAVs) are typically able to autonomously execute a pre-planned mission. However, UAVs usually fly in a very dynamic environment which requires dynamic changes to the flight plan; this mission management activity is usually tasked to human supervision. Within this article, a software system that autonomously accomplishes the mission management task for a UAV will be proposed. The system is based on a set of theoretical concepts which allow the description of a flight plan and implemented using a combination of Soar intelligent agents and traditional control techniques. The system is capable of automatically generating and then executing an entire flight plan after being assigned a set of objectives. This article thoroughly describes all system components and then presents the results of tests that were executed using a realistic simulation environment.
Using computer software to improve group decision-making.
Mockler, R J; Dologite, D G
1991-08-01
This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.
Collaborative Aviation Weather Statement - An Impact-based Decision Support Tool
NASA Astrophysics Data System (ADS)
Blondin, Debra
2016-04-01
Historically, convection causes the highest number of air traffic constraints on the United States National Air Space (NAS). Increased NAS predictability allows traffic flow managers to more effectively initiate, amend or terminate planned or active traffic management initiatives, resulting in more efficient use of available airspace. A Collaborative Aviation Weather Statement (CAWS) is an impact-based decision support tool used for the timely delivery of high-confidence, high-relevance aviation convective weather forecasts to air traffic managers. The CAWS is a graphical and textual forecast produced by a collaborative team of meteorologists from the Aviation Weather Center (AWC), Center Weather Service Units, and airlines to bring attention to high impact areas of thunderstorms. The CAWS addresses thunderstorm initiation or movement into the airports having the highest volume of traffic or into traffic sensitive jet routes. These statements are assessed by planners at the Federal Aviation Administration's (FAA) Air Route Traffic Control Centers and are used for planning traffic management initiatives to balance air traffic flow across the United States. The FAA and the airline industry use the CAWS to plan, manage, and execute operations in the NAS, thereby improving the system efficiency and safety and also saving dollars for industry and the traveling public.
Markon, Carl J.
1988-01-01
Digital land cover and terrain data for the Upper Kuskokwim Resource Hanagement Area (UKRMA) were produced by the U.S. Geological Survey, Earth Resources Observation Systems Field Office, Anchorage, Alaska for the Bureau of Land Management. These and other environmental data, were incorporated into a digital data base to assist in the management and planning of the UKRMA. The digital data base includes land cover classifications, elevation, slope, and aspect data centering on the UKRMA boundaries. The data are stored on computer compatible tapes at a 50-m pixel size. Additional digital data in the data base include: (a) summer and winter Landsat multispectral scanner (MSS) data registered to a 50-m Universal Transverse Mercator grid; (b) elevation, slope, aspect, and solar illumination data; (c) soils and surficial geology; and (e) study area boundary. The classification of Landsat MSS data resulted in seven major classes and 24 subclasses. Major classes include: forest, shrubland, dwarf scrub, herbaceous, barren, water, and other. The final data base will be used by resource personnel for management and planning within the UKRMA.
NASA Astrophysics Data System (ADS)
Trindade, B. C.; Reed, P. M.
2017-12-01
The growing access and reduced cost for computing power in recent years has promoted rapid development and application of multi-objective water supply portfolio planning. As this trend continues there is a pressing need for flexible risk-based simulation frameworks and improved algorithm benchmarking for emerging classes of water supply planning and management problems. This work contributes the Water Utilities Management and Planning (WUMP) model: a generalizable and open source simulation framework designed to capture how water utilities can minimize operational and financial risks by regionally coordinating planning and management choices, i.e. making more efficient and coordinated use of restrictions, water transfers and financial hedging combined with possible construction of new infrastructure. We introduce the WUMP simulation framework as part of a new multi-objective benchmark problem for planning and management of regionally integrated water utility companies. In this problem, a group of fictitious water utilities seek to balance the use of the mentioned reliability driven actions (e.g., restrictions, water transfers and infrastructure pathways) and their inherent financial risks. Several traits of this problem make it ideal for a benchmark problem, namely the presence of (1) strong non-linearities and discontinuities in the Pareto front caused by the step-wise nature of the decision making formulation and by the abrupt addition of storage through infrastructure construction, (2) noise due to the stochastic nature of the streamflows and water demands, and (3) non-separability resulting from the cooperative formulation of the problem, in which decisions made by stakeholder may substantially impact others. Both the open source WUMP simulation framework and its demonstration in a challenging benchmarking example hold value for promoting broader advances in urban water supply portfolio planning for regions confronting change.
ERIC Educational Resources Information Center
Jones, Dennis; And Others
The National Center for Higher Education Management Systems (NCHEMS) has completed the development and demonstration of a library statistical data base. The data base, or management information system, was developed for administrators of public and academic libraries. The system provides administrators with a framework of information and…
ERIC Educational Resources Information Center
Edwards, Fleur
2012-01-01
This paper explores the nascent field of risk management in higher education, which is of particular relevance in Australia currently, as the Commonwealth Government implements its plans for a risk-based approach to higher education regulation and quality assurance. The literature outlines the concept of risk management and risk-based approaches…
Enrollment Planning Using Computer Decision Model: A Case Study at Grambling State University.
ERIC Educational Resources Information Center
Ghosh, Kalyan; Lundy, Harold W.
Achieving enrollment goals continues to be a major administrative concern in higher education. Enrollment management can be assisted through the use of computerized planning and forecast models. Although commercially available Markov transition type curve fitting models have been developed and used, a microcomputer-based decision planning model…
12 CFR 933.2 - Contents of plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Contents of plan. 933.2 Section 933.2 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS BANK... regulatory risk-based capital requirement after the plan is implemented. [66 FR 8310, Jan. 30, 2001, as...
Research-Based Unit and Lesson Planning: Maximizing Student Achievement
ERIC Educational Resources Information Center
Pagliaro, Marie
2012-01-01
By integrating the best of current research and practice in curriculum planning this book presents that comprehensive topic in a manageable form. Examples throughout are representative of different grade levels and subjects areas. It should be understood at the outset that the content offered for curriculum planning is not a rigid prescriptive…
12 CFR 933.2 - Contents of plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Contents of plan. 933.2 Section 933.2 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN BANK RISK MANAGEMENT AND CAPITAL STANDARDS BANK... regulatory risk-based capital requirement after the plan is implemented. [66 FR 8310, Jan. 30, 2001, as...
Advanced Technologies for Future Spacecraft Cockpits and Space-based Control Centers
NASA Technical Reports Server (NTRS)
Garcia-Galan, Carlos; Uckun, Serdar; Gregory, William; Williams, Kerry
2006-01-01
The National Aeronautics and Space Administration (NASA) is embarking on a new era of Space Exploration, aimed at sending crewed spacecraft beyond Low Earth Orbit (LEO), in medium and long duration missions to the Lunar surface, Mars and beyond. The challenges of such missions are significant and will require new technologies and paradigms in vehicle design and mission operations. Current roles and responsibilities of spacecraft systems, crew and the flight control team, for example, may not be sustainable when real-time support is not assured due to distance-induced communication lags, radio blackouts, equipment failures, or other unexpected factors. Therefore, technologies and applications that enable greater Systems and Mission Management capabilities on-board the space-based system will be necessary to reduce the dependency on real-time critical Earth-based support. The focus of this paper is in such technologies that will be required to bring advance Systems and Mission Management capabilities to space-based environments where the crew will be required to manage both the systems performance and mission execution without dependence on the ground. We refer to this concept as autonomy. Environments that require high levels of autonomy include the cockpits of future spacecraft such as the Mars Exploration Vehicle, and space-based control centers such as a Lunar Base Command and Control Center. Furthermore, this paper will evaluate the requirements, available technology, and roadmap to enable full operational implementation of onboard System Health Management, Mission Planning/re-planning, Autonomous Task/Command Execution, and Human Computer Interface applications. The technology topics covered by the paper include enabling technology to perform Intelligent Caution and Warning, where the systems provides directly actionable data for human understanding and response to failures, task automation applications that automate nominal and Off-nominal task execution based on human input or integrated health state-derived conditions. Shifting from Systems to Mission Management functions, we discuss the role of automated planning applications (tactical planning) on-board, which receive data from the other cockpit automation systems and evaluate the mission plan against the dynamic systems and mission states and events, to provide the crew with capabilities that enable them to understand, change, and manage the timeline of their mission. Lastly, we discuss the role of advanced human interface technologies that organize and provide the system md mission information to the crew in ways that maximize their situational awareness and ability to provide oversight and control of aLl the automated data and functions.
Kevin C. Ryan; Tonja S. Opperman
2013-01-01
LANDFIRE is the working name given to the Landscape Fire and Resource Management Planning Tools Project (http://www.landfire.gov). The project was initiated in response to mega-fires and the need for managers to have consistent, wall-to-wall (i.e., all wildlands regardless of agency/ownership), geospatial data, on vegetation, fuels, and terrain to support use of fire...
Minehart, Rebecca D; Pian-Smith, May C M; Walzer, Toni B; Gardner, Roxane; Rudolph, Jenny W; Simon, Robert; Raemer, Daniel B
2012-06-01
Organizational behavior and management fields have long realized the importance of teamwork and team-building skills, but only recently has health care training focused on these critical elements. Communication styles and strategies are a common focus of team training but have not yet been consistently applied to medicine. We sought to determine whether such communication strategies, specifically "advocacy" and "inquiry," were used de novo by medical professionals in a simulation-based teamwork and crisis resource management course. Explicit expression of a jointly managed clinical plan between providers, a strategy shown to improve patient safety, was also evaluated. Forty-four of 54 videotaped performances of an ongoing team-building skills course were viewed and analyzed for presence of advocacy and/or inquiry that related to information or a plan; inclusion criteria were participation of a nonconfederate obstetrician and an anesthesiologist. Verbal statement of a jointly managed clinical plan was also recorded. Anesthesiologists advocated information in 100% of cases and advocated their plans in 93% of cases but inquired information in 30% of cases and inquired about the obstetricians' plans in 11% of cases. Obstetricians advocated information in 73% of cases, advocated their plans in 73% of cases, inquired information in 75% of cases, and inquired about the anesthesiologists' plans in 59% of cases. An explicitly stated joint team plan was formed in 45% of cases. Anesthesiologists advocated more frequently than obstetricians, while obstetricians inquired and advocated in more balanced proportions. However, fewer than half of the teams explicitly agreed on a joint plan. Increasing awareness of communication styles, and possibly incorporating these skills into medical training, may help teams arrive more efficiently at jointly managed clinical plans in crisis situations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP thatmore » details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.« less
Population-based medical and disease management: an evaluation of cost and quality.
Wise, Christopher G; Bahl, Vinita; Mitchell, Rita; West, Brady T; Carli, Thomas
2006-02-01
Reports by the Institute of Medicine and the Health Care Financing Administration have emphasized that the integration of medical care delivery, evidence-based medicine, and chronic care disease management may play a significant role in improving the quality of care and reducing medical care costs. The specific aim of this project is to assess the impact of an integrated set of care coordination tools and chronic disease management interventions on utilization, cost, and quality of care for a population of beneficiaries who have complementary health coverage through a plan designed to apply proactive medical and disease management processes. The utilization of health care services by the study population was compared to another population from the same geographic service area and covered by a traditional fee-for-service indemnity insurance plan that provided few medical or disease management services. Evaluation of the difference in utilization was based on the difference in the cost per-member-per-month (PMPM) in a 1-year measurement period, after adjusting for differences in fee schedules, case-mix and healthcare benefit design. After adjustments for both case-mix and benefit differences, the study group is $63 PMPM less costly than the comparison population for all members. Cost differences are largest in the 55-64 and 65 and above age groups. The study group is $115 PMPM lower than the comparison population for the age category of 65 years and older, after adjustments for case-mix and benefits. Health Plan Employer and Data Information Set (HEDIS)-based quality outcomes are near the 90th percentile for most indications. The cost outcomes of a population served by proactive, population-based disease management and complex care management, compared to an unmanaged population, demonstrates the potential of coordinated medical and disease management programs. Further studies utilizing appropriate methodologies would be beneficial.
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ji, H; Lorio, V; Cernica, G
2016-06-15
Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity indexmore » and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable improvement in the plan quality.« less
Priority scheme planning for the robust SSM/PMAD testbed
NASA Technical Reports Server (NTRS)
Elges, Michael R.; Ashworth, Barry R.
1991-01-01
Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.
43 CFR 46.110 - Incorporating consensus-based management.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., whenever practicable, use a consensus-based management approach to the NEPA process. (d) If the Responsible... to implementation of the bureau decision. It seeks to achieve agreement from diverse interests on the goals of, purposes of, and needs for bureau plans and activities, as well as the methods anticipated to...
43 CFR 46.110 - Incorporating consensus-based management.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., whenever practicable, use a consensus-based management approach to the NEPA process. (d) If the Responsible... to implementation of the bureau decision. It seeks to achieve agreement from diverse interests on the goals of, purposes of, and needs for bureau plans and activities, as well as the methods anticipated to...
Between Oais and Agile a Dynamic Data Management Approach
NASA Astrophysics Data System (ADS)
Bennett, V. L.; Conway, E. A.; Waterfall, A. M.; Pepler, S.
2015-12-01
In this paper we decribe an approach to the integration of existing archival activities which lies between compliance with the more rigid OAIS/TRAC standards and a more flexible "Agile" approach to the curation and preservation of Earth Observation data. We provide a high level overview of existing practice and discuss how these procedures can be extended and supported through the description of preservation state. The aim of which is to facilitate the dynamic controlled management of scientific data through its lifecycle. While processes are considered they are not statically defined but rather driven by human interactions in the form of risk management/review procedure that produce actionable plans, which are responsive to change. We then proceed by describing the feasibility testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospheric Data Centre and NERC Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2 Petabytes of data and 137 million individual files, which were analysed and characterised in terms of format, based risk. We are then able to present an overview of the format based risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets We continue by presenting a dynamic data management information model and provide discussion of the following core model entities and their relationships: Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans which support responsive interactions with the community. The Result entities describe the outcomes of the plans. This includes Acquisitions. Mitigations and Accepted Risks. With risk acceptance permitting imperfect but functional solutions that can be realistically supported within an archives resource levels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hannan, M.A., E-mail: hannan@eng.ukm.my; Abdulla Al Mamun, Md., E-mail: md.abdulla@siswa.ukm.edu.my; Hussain, Aini, E-mail: aini@eng.ukm.my
Highlights: • Classification of available technologies for SWM system in four core category. • Organization of technology based SWM systems in three main groups. • Summary of SWM systems with target application, methodology and functional domain. • Issues and challenges are highlighted for further design of a sustainable system. - Abstract: In the backdrop of prompt advancement, information and communication technology (ICT) has become an inevitable part to plan and design of modern solid waste management (SWM) systems. This study presents a critical review of the existing ICTs and their usage in SWM systems to unfold the issues and challengesmore » towards using integrated technologies based system. To plan, monitor, collect and manage solid waste, the ICTs are divided into four categories such as spatial technologies, identification technologies, data acquisition technologies and data communication technologies. The ICT based SWM systems classified in this paper are based on the first three technologies while the forth one is employed by almost every systems. This review may guide the reader about the basics of available ICTs and their application in SWM to facilitate the search for planning and design of a sustainable new system.« less
Review of the Water Resources Information System of Argentina
Hutchison, N.E.
1987-01-01
A representative of the U.S. Geological Survey traveled to Buenos Aires, Argentina, in November 1986, to discuss water information systems and data bank implementation in the Argentine Government Center for Water Resources Information. Software has been written by Center personnel for a minicomputer to be used to manage inventory (index) data and water quality data. Additional hardware and software have been ordered to upgrade the existing computer. Four microcomputers, statistical and data base management software, and network hardware and software for linking the computers have also been ordered. The Center plans to develop a nationwide distributed data base for Argentina that will include the major regional offices as nodes. Needs for continued development of the water resources information system for Argentina were reviewed. Identified needs include: (1) conducting a requirements analysis to define the content of the data base and insure that all user requirements are met, (2) preparing a plan for the development, implementation, and operation of the data base, and (3) developing a conceptual design to inform all development personnel and users of the basic functionality planned for the system. A quality assurance and configuration management program to provide oversight to the development process was also discussed. (USGS)
Computer Assisted Chronic Disease Management: Does It Work? A Pilot Study Using Mixed Methods
Jones, Kay M.; Biezen, Ruby; Piterman, Leon
2013-01-01
Background. Key factors for the effective chronic disease management (CDM) include the availability of practical and effective computer tools and continuing professional development/education. This study tested the effectiveness of a computer assisted chronic disease management tool, a broadband-based service known as cdmNet in increasing the development of care plans for patients with chronic disease in general practice. Methodology. Mixed methods are the breakthrough series methodology (workshops and plan-do-study-act cycles) and semistructured interviews. Results. Throughout the intervention period a pattern emerged suggesting GPs use of cdmNet initially increased, then plateaued practice nurses' and practice managers' roles expanded as they became more involved in using cdmNet. Seven main messages emerged from the GP interviews. Discussion. The overall use of cdmNet by participating GPs varied from “no change” to “significant change and developing many the GPMPs (general practice management plans) using cdmNet.” The variation may be due to several factors, not the least, allowing GPs adequate time to familiarise themselves with the software and recognising the benefit of the team approach. Conclusion. The breakthrough series methodology facilitated upskilling GPs' management of patients diagnosed with a chronic disease and learning how to use the broadband-based service cdmNet. PMID:24959576
Approach of Decision Making Based on the Analytic Hierarchy Process for Urban Landscape Management
NASA Astrophysics Data System (ADS)
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Approach of decision making based on the analytic hierarchy process for urban landscape management.
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Report on a Knowledge-Based Software Assistant.
1983-08-01
maintainers, project managers , and end-users). In this paradigm, software activities, including definition, management , and validation will be...project management . This report also presents a plan for the development of the KBSA, along with a description of the necessary supporting technology...Activity Coordination .. .. .. ..... ...... ..... .... 19 3.2 Project Management and Documentation. .. ... ........ 20 3.2.1 Project Management Facet
ERIC Educational Resources Information Center
Her Majesty's Inspectorate of Education, 2010
2010-01-01
This report evaluates college programmes within a wide range of disciplines subsumed within the business, management and administration (BMA) area. The disciplines covered are: business and finance; economics; law; management; public administration; international business studies; enterprise; management skills; management planning and control…
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
Intervention into a turbulent urban situation: A case study. Ph.D. Thesis
NASA Technical Reports Server (NTRS)
Caldwell, G. M., Jr.
1973-01-01
The application is reported of NASA management philosophy and techniques within New Castle County, Delaware, to meet actual problems of community violence. It resulted in restructuring the county approach to problems of this nature, and development of a comprehensive system for planning, based on the NASA planning process. The method involved federal, state, and local resources with community representatives in solving the problems. The concept of a turbulent environment is presented with parallels drawn between NASA management experience and problems of management within an urban arena.
Digital spatial soil and land information for agriculture development
NASA Astrophysics Data System (ADS)
Sharma, R. K.; Laghathe, Pankaj; Meena, Ranglal; Barman, Alok Kumar; Das, Satyendra Nath
2006-12-01
Natural resource management calls for study of natural system prevailing in the country. In India floods and droughts visit regularly, causing extensive damages of natural wealth including agriculture that are crucial for sustenance of economic growth. The Indian Sub-continent drained by many major rivers and their tributaries where watershed, the hydrological unit forms a natural system that allows management and development of land resources following natural harmony. Acquisition of various kinds and levels of soil and land characteristics using both conventional and remote sensing techniques and subsequent development of digital spatial data base are essential to evolve strategy for planning watershed development programmes, their monitoring and impact evaluation. The multi-temporal capability of remote sensing sensors helps to update the existing data base which are of dynamic in nature. The paper outlines the concept of spatial data base development, generation using remote sensing techniques, designing of data structure, standardization and integration with watershed layers and various non spatial attribute data for various applications covering watershed development planning, alternate land use planning, soil and water conservation, diversified agriculture practices, generation of soil health card, soil and land reclamation, etc. The soil and land characteristics are vital to derive various interpretative groupings or master table that helps to generate the desired level of information of various clients using the GIS platform. The digital spatial data base on soils and watersheds generated by All India Soil and Land Use Survey will act as a sub-server of the main GIS based Web Server being hoisted by the planning commission for application of spatial data for planning purposes under G2G domain. It will facilitate e-governance for natural resource management using modern technology.
Gold and Silver Health Plans: Accommodating Demand Heterogeneity in Managed Competition
Glazer, Jacob; McGuire, Thomas G.
2011-01-01
New regulation of health insurance markets creates multiple levels of health plans, with designations like “Gold” and “Silver”. The underlying rationale for the heavy-metal approach to insurance regulation is that heterogeneity in demand for health care is not only due to health status (sick demand more than the healthy) but also to other, “taste” related factors (rich demand more than the poor). This paper models managed competition with demand heterogeneity to consider plan payment and enrollee premium policies in relation to efficiency (net consumer benefit) and fairness (the European concept of “solidarity”). Specifically, this paper studies how to implement a “Silver” and “Gold” health plan efficiently and fairly in a managed competition context. We show that there are sharp tradeoffs between efficiency and fairness. When health plans cannot or may not (because of regulation) base premiums on any factors affecting demand, enrollees do not choose the efficient plan. When taste (e.g. income) can be used as a basis of payment, a simple tax can achieve both efficiency and fairness. When only health status (and not taste) can be used as a basis of payment, health status-based taxes and subsidies are required and efficiency can only be achieved with a modified version of fairness we refer to as “weak solidarity.” An overriding conclusion is that the regulation of premiums for both the basic and the higher level plans is necessary for efficiency. PMID:21767887
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive body repair I and II. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for small engine repair I and II. Presented first are a program description…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses in business and computer technology I-II.…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for marketing I-II and fashion merchandising. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in brick, block, and stonemasonry: brick,…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for diesel engine mechanics I and II. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for forestry I and II. Presented first are a program description and course…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family and consumer sciences and related technology (enrichment).…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for machine tool operation/machine shop I and II. Presented first are a…
ERIC Educational Resources Information Center
Misfeldt, Morten
2015-01-01
In this paper I describe how students use a project management simulation game based on an attack-defense mechanism where two teams of players compete by challenging each other's projects. The project management simulation game is intended to be played by pre-service construction workers and engineers. The gameplay has two parts: a planning part,…
Manage Toward Success - Utilization of Analytics in Acquisition Decision Making
2015-04-01
on the concept of knowledge- based acquisition described by the GAO. In the GAO (2005) report for National Aeronautics and Space Administration ( NASA ...acquisition programs, GAO recommended to NASA , and NASA subsequently con- curred, that transition to a knowledge-based acquisition framework will...Certification and Accreditation Process; ERAM = Enterprise Risk Assessment Manager; EVMS = Earned Value Management System; GOV = Government; POA&M = Plan of
Noble, Bram F
2004-03-01
Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.
Integrated Watershed Management using the Watershed Management Optimization Support Tool (WMOST)
Integrated watershed management is an effective planning strategy to balance tradeoffs between competing water uses within a watershed. WMOST is an Excel-based decision tool to aid planners in making cost effective decisions that meet water quantity and quality regulations. WMOST...
Nevada Test Site Resource Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-12-01
The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of themore » RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.« less
Resource analysis applications in Michigan. [NASA remote sensing
NASA Technical Reports Server (NTRS)
Schar, S. W.; Enslin, W. R.; Sattinger, I. J.; Robinson, J. G.; Hosford, K. R.; Fellows, R. S.; Raad, J. H.
1974-01-01
During the past two years, available NASA imagery has been applied to a broad spectrum of problems of concern to Michigan-based agencies. These demonstrations include the testing of remote sensing for the purposes of (1) highway corridor planning and impact assessments, (2) game management-area information bases, (3) multi-agency river basin planning, (4) timber resource management information systems, (5) agricultural land reservation policies, and (6) shoreline flooding damage assessment. In addition, cost accounting procedures have been developed for evaluating the relative costs of utilizing remote sensing in land cover and land use analysis data collection procedures.
Managers Handbook for Software Development
NASA Technical Reports Server (NTRS)
Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.
1984-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.
NASA Astrophysics Data System (ADS)
Boisvert-Chouinard, J.; Halbe, J.; Baig, A. I.; Adamowski, J. F.
2014-12-01
The principles of Integrated Water Resource Management outline the importance of stakeholder participation in water management processes, but in practice, there is a lack of meaningful engagement in water planning and implementation, and participation is often limited to public consultation and education. When models are used to support water planning, stakeholders are usually not involved in their development and use, and the models commonly fail to represent important feedbacks between socio-economic and physical processes. This paper presents the development of holistic models of the Du Chêne basin in Quebec, and the Rechna Doab basin in Pakistan, that simulate socio-economic and physical processes related to, respectively, water quality management, and soil salinity management. The models each consists of two sub-components: a System Dynamics (SD) model, and a physically based model. The SD component was developed in collaboration with key stakeholders in the basins. The Du Chêne SD model was coupled with a Soil and Water Assessment Tool (SWAT) model, while the Rechna Doab SD model was coupled with SahysMod, a soil salinity model. The coupled models were used to assess the environmental and socio-economic impacts of different management scenarios proposed by stakeholders. Results indicate that coupled SD - physically-based models can be used as effective tools for participatory water planning and implementation. The participatory modeling process provides a structure for meaningful stakeholder engagement, and the models themselves can be used to transparently and coherently assess and compare different management options.
Integrated Workforce Planning Model: A Proof of Concept
NASA Technical Reports Server (NTRS)
Guruvadoo, Eranna K.
2001-01-01
Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.
Embedding ecosystem services in coastal planning leads to better outcomes for people and nature
Arkema, Katie K.; Verutes, Gregory M.; Wood, Spencer A.; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M.; Griffin, Robert; Guerry, Anne D.
2015-01-01
Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize’s coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions. PMID:26082545
Embedding ecosystem services in coastal planning leads to better outcomes for people and nature.
Arkema, Katie K; Verutes, Gregory M; Wood, Spencer A; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M; Griffin, Robert; Guerry, Anne D
2015-06-16
Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize's coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions.
The potential of disease management for neuromuscular hereditary disorders.
Chouinard, Maud-Christine; Gagnon, Cynthia; Laberge, Luc; Tremblay, Carmen; Côté, Charlotte; Leclerc, Nadine; Mathieu, Jean
2009-01-01
Neuromuscular hereditary disorders require long-term multidisciplinary rehabilitation management. Although the need for coordinated healthcare management has long been recognized, most neuromuscular disorders are still lacking clinical guidelines about their long-term management and structured evaluation plan with associated services. One of the most prevalent adult-onset neuromuscular disorders, myotonic dystrophy type 1, generally presents several comorbidities and a variable clinical picture, making management a constant challenge. This article presents a healthcare follow-up plan and proposes a nursing case management within a disease management program as an innovative and promising approach. This disease management program and model consists of eight components including population identification processes, evidence-based practice guidelines, collaborative practice, patient self-management education, and process outcomes evaluation (Disease Management Association of America, 2004). It is believed to have the potential to significantly improve healthcare management for neuromuscular hereditary disorders and will prove useful to nurses delivering and organizing services for this population.
Personalised Care Plan Management Utilizing Guideline-Driven Clinical Decision Support Systems.
Laleci Erturkmen, Gokce Banu; Yuksel, Mustafa; Sarigul, Bunyamin; Lilja, Mikael; Chen, Rong; Arvanitis, Theodoros N
2018-01-01
Older age is associated with an increased accumulation of multiple chronic conditions. The clinical management of patients suffering from multiple chronic conditions is very complex, disconnected and time-consuming with the traditional care settings. Integrated care is a means to address the growing demand for improved patient experience and health outcomes of multimorbid and long-term care patients. Care planning is a prevalent approach of integrated care, where the aim is to deliver more personalized and targeted care creating shared care plans by clearly articulating the role of each provider and patient in the care process. In this paper, we present a method and corresponding implementation of a semi-automatic care plan management tool, integrated with clinical decision support services which can seamlessly access and assess the electronic health records (EHRs) of the patient in comparison with evidence based clinical guidelines to suggest personalized recommendations for goals and interventions to be added to the individualized care plans.
Pharmacy management of vaccines.
Cannon, H Eric
2007-09-01
Although standard vaccines have traditionally been granted full coverage in managed care, the recent introduction of several novel vaccine products has necessitated the revision of pharmacy management strategies throughout the nation. To review pharmacy management strategies for a number of emerging vaccines, with unique plan perspectives from SelectHealth, an Intermountain Healthcare company serving approximately 500,000 members in Utah. Because several recently introduced vaccines target previously unaddressed diseases and carry higher costs than traditional vaccines, several plans have adapted a novel approach to manage vaccine coverage on an individual product basis. At SelectHealth, recently introduced vaccines for rotavirus, respiratory syncytial virus (RSV), herpes zoster, and human papillomavirus (HPV) have required special attention in terms of pharmacy management. After carefully weighing acquisition and administration costs, anticipated uptake and use, direct and indirect health care costs averted, and quality of life issues, plan leadership decided to cover many of the new vaccines (i.e., rotavirus, RSV, and herpes zoster) under a nonstandard vaccination benefit. However, because substantial cost savings and high use of the quadrivalent HPV vaccine was anticipated within SelectHealth, the plan decided to fully cover the product. Although they complicate traditional pharmacy management, novel vaccines provide clinical benefit that managed care organizations cannot ignore. One universal strategy will not suffice in managing all the different vaccines entering the market, and a tailored approach should be employed based on the individual characteristics and use of each product.
Edwards, Helen; Walsh, Anne; Courtney, Mary; Monaghan, Sarah; Wilson, Jenny; Young, Jeanine
2007-10-01
This study examined effectiveness of a theoretically based education programme in reducing inappropriate antipyretic use in fever management. Paediatric nurses' inconsistent, ritualistic antipyretic use in fever management is influenced by many factors including inconsistent beliefs and parental requests. Determinants of antipyretic administration, identified by the theory of planned behaviour, were belief-based attitudes and subjective norms. A quasi-experiment explored group effects of a peer education programme, based on the theory of planned behaviour, on factors influencing paediatric nurses' antipyretic administration. Surveys and chart audits collected data from medical wards at experimental and control hospitals one month pre and one and four months postpeer education programme. All nurses employed in targeted wards were eligible to participate in surveys and all eligible charts were audited. The peer education programme consisted of four one-hour sessions targeting evidence-based knowledge, myths and misconceptions, normative, attitudinal and control influences over and rehearsal of evidence-based fever management. All nurses in experimental hospital targeted wards were eligible to attend. Peer education and support facilitated session information reaching those unable to attend sessions. Two-way univariate anovas explored between subject, experimental and control group and within subject factors, pre, post and latency data. Significant interactions in normative influence (p = 0.01) and intentions (p = 0.01), a significant main group effect in control influence (p = 0.01) and a significant main effect between audit data across time points (p = 0.03) highlight peer education programme effectiveness in behaviour change. Normative, control and intention changes postpeer education programme were maintained in latency data; mean temperature was not. The peer education programme, based on a behaviour change theory, initiated and maintained evidence-based intentions for antipyretics use in fever management. The promotion of evidence-based change in organizational unit intentions and behaviour highlights the crucial role peer support and education can play in continuing educational programmes.
ABM and GIS-based multi-scenarios volcanic evacuation modelling of Merapi
NASA Astrophysics Data System (ADS)
Jumadi, Carver, Steve; Quincey, Duncan
2016-05-01
Conducting effective evacuation is one of the successful keys to deal with such crisis. Therefore, a plan that considers the probability of the spatial extent of the hazard occurrences is needed. Likewise, the evacuation plan in Merapi is already prepared before the eruption on 2010. However, the plan could not be performed because the eruption magnitude was bigger than it was predicted. In this condition, the extent of the hazardous area was increased larger than the prepared hazard model. Managing such unpredicted situation need adequate information that flexible and adaptable to the current situation. Therefore, we applied an Agent-based Model (ABM) and Geographic Information System (GIS) using multi-scenarios hazard model to support the evacuation management. The methodology and the case study in Merapi is provided.
[Infrastructure and contents of clinical data management plan].
Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei
2015-11-01
Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality.
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
43 CFR 1610.4 - Resource management planning process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...
NASA Astrophysics Data System (ADS)
Zuloaga, P.; Ordoñez, M.; Andrade, C.; Castellote, M.
2011-04-01
The generic design of the centralised spent fuel storage facility was approved by the Spanish Safety Authority in 2006. The planned operational life is 60 years, while the design service life is 100 years. Durability studies and surveillance of the behaviour have been considered from the initial design steps, taking into account the accessibility limitations and temperatures involved. The paper presents an overview of the ageing management program set in support of the Performance Assessment and Safety Review of El Cabril low and intermediate level waste (LILW) disposal facility. Based on the experience gained for LILW, ENRESA has developed a preliminary definition of the Ageing Management Plan for the Centralised Interim Storage Facility of spent Fuel and High Level Waste (HLW), which addresses the behaviour of spent fuel, its retrievability, the confinement system and the reinforced concrete structure. It includes tests plans and surveillance design considerations, based on the El Cabril LILW disposal facility.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
NASA Technical Reports Server (NTRS)
Golden, Keith; Clancy, Dan (Technical Monitor)
2001-01-01
The data management problem comprises data processing and data tracking. Data processing is the creation of new data based on existing data sources. Data tracking consists of storing metadata descriptions of available data. This paper addresses the data management problem by casting it as an AI planning problem. Actions are data-processing commands, plans are dataflow programs and goals are metadata descriptions of desired data products. Data manipulation is simply plan generation and execution, and a key component of data tracking is inferring the effects of an observed plan. We introduce a new action language for data management domains, called ADILM. We discuss the connection between data processing and information integration and show how a language for the latter must be modified to support the former. The paper also discusses information gathering within a data-processing framework, and show how ADILM metadata expressions are a generalization of Local Completeness.
Development of transportation asset management decision support tools : final report.
DOT National Transportation Integrated Search
2017-08-09
This study developed a web-based prototype decision support platform to demonstrate the benefits of transportation asset management in monitoring asset performance, supporting asset funding decisions, planning budget tradeoffs, and optimizing resourc...
David E. Busch; Jon R. Martin
2006-01-01
Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...
Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2005-03-02
This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soilmore » at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for former waste management units, legacy contamination source areas and distribution of contamination in soils, and environmental infrastructure (e.g., caps, monitoring systems, etc.) that is in place or planned in association with RAs. (3) Regulatory considerations and processes for management and disposition of waste soil upon generation, including regulatory drivers, best management practices (BMPs), waste determination protocols, waste acceptance criteria, and existing waste management procedures and BMPs for Y-12. This Soil Management Plan provides information to project planners to better coordinate their activities with other organizations and programs with a vested interest in soil disturbance activities at Y-12. The information allows project managers and maintenance personnel to evaluate and anticipate potential contaminant levels that may be present at a proposed soil disturbance site prior to commencement of activities and allows a more accurate assessment of potential waste management requirements.« less
44 CFR 351.27 - The Department of Defense.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true The Department of Defense. 351.27 Section 351.27 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT... Assignments § 351.27 The Department of Defense. (a) Determine appropriate planning bases for Department of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
... DAS and sector-based management because of fundamental differences between these groups of vessels.... SUPPLEMENTARY INFORMATION: Background Amendment 16 to the Northeast Multispecies Fisheries Management Plan... year 2013, the New England Fishery Management Council (Council) included a measure in Framework...
75 FR 4348 - Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... Pacific Fishery Management Council (Pacific Council) will convene a joint meeting of the Ecosystem Plan Development Team (EPDT) and Ecosystem Advisory Subpanel (EAS) which is open to the public. DATES: The meeting... review Pacific Council guidance and make recommendations on implementing an ecosystem-based management...
78 FR 53731 - North Pacific Fishery Management Council; Notice of Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... meetings. SUMMARY: The North Pacific Fishery Management Council (Council) Ecosystem Committee will meet in... agenda will be as follows: Development of Ecosystem-based management (EMB) vision statement; Operationalizing EBM in Council projects, including the Aleutian Islands Fishery Ecosystem Plan, the Arctic Fishery...
Knowledge management: an application to wildfire prevention planning
Daniel L Schmoldt
1989-01-01
Residential encroachment into wildland areas places an additional burden on fire management activities. Prevention programs, fuel management efforts, and suppression strategies, previously employed in wildland areas, require modification for protection of increased values at risk in this interface area. Knowledge-based computer systems are being investigated as...
DOT National Transportation Integrated Search
1997-06-19
NASA and the Federal Aviation Administration (FAA) have designed and developed an automation tool known as the Traffic Management Advisor (TMA). The TMA is a time-based strategic planning tool that provides Traffic Management Coordinators (TMCs) and ...
Facilities Management: A Program for the 1980s.
ERIC Educational Resources Information Center
Kaiser, Harvey H.
1980-01-01
Successful facilities management is described as based on a 10-point comprehensive program including: (1) physical planning policy; (2) facilities analysis; (3) management audit; (4) space utilization; (5) capital programs; (6) deferred maintenance; (7) controlled maintenance; (8) energy conservation; (9) environmental quality, health, and safety;…
33 CFR 385.30 - Master Implementation Sequencing Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... projects of the Plan, including pilot projects and operational elements, based on the best scientific... Florida Water Management District shall also consult with the South Florida Ecosystem Restoration Task...; (ii) Information obtained from pilot projects; (iii) Updated funding information; (iv) Approved...
A Comparative History of Department of Defense Management Reform from 1947 to 2005
2006-12-01
type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas from the business ...introduce some type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas...Steering Group BMMP Business Management Modernization Plan BRAC Base Realignment and Closure C3I Command, Control, Communications, and Intelligence
Women in water management: the need for local planning.
Bhatt, M R
1995-08-01
This article on women's role in water resource management is based on a paper delivered at a seminar organized at the Water and Land Management Institute in Anand, India, in 1994. The article reflects Family Planning International's (FPI) experience in community-based water resource development. Most analyses of village and household water management data exclude women's role. The reasons are identified as the lack of inclusion of women's thinking in land-development research and planning, the dominance of males in planning and consequent male assumptions made about women's work and use of water, the lack of valuation of the nonmonetary nature of women's relationship to water, and the ease of ignoring women. Women's roles that are obstacles to inclusion in research and planning are identified as the lack of effective women's lobbies, the undervaluation by women of their work, and the lack of professional recognition of women as potential users of water or spokespersons for more than their own self-interests as women. National water policies are shifting to community-based management because local authorities are in daily contact with users, of whom about 50% are women. Historically national policy shifted from attention to distribution of investments in the water sector to reorganization of water agencies and to building up the capacity of private or voluntary agencies. The local context allows for more efficient and effective responses to local conditions. Local institutions and groups are better equipped to solicit local participation. One primary lesson learned by FPI is that local water resource planning is very important in strengthening the economic and individual capacity of poor people in underdeveloped areas. FPI's experience in Mahesana, Banaskantha, and Sabarkantha in Gujarat state supports this lesson learned. Water resource development policies resulted in mixed outcomes, and national control has been inefficient and disrespectful to local authorities. Another obstacle in Gujarat to water resource development is identified as increased demand for public water services and inadequate provision of services due to remoteness of the area and financial limitations of central agencies. Infrastructure is poorly maintained.
He, Ji; Dai, Xinbin; Zhao, Xuechun
2007-01-01
Background BLAST searches are widely used for sequence alignment. The search results are commonly adopted for various functional and comparative genomics tasks such as annotating unknown sequences, investigating gene models and comparing two sequence sets. Advances in sequencing technologies pose challenges for high-throughput analysis of large-scale sequence data. A number of programs and hardware solutions exist for efficient BLAST searching, but there is a lack of generic software solutions for mining and personalized management of the results. Systematically reviewing the results and identifying information of interest remains tedious and time-consuming. Results Personal BLAST Navigator (PLAN) is a versatile web platform that helps users to carry out various personalized pre- and post-BLAST tasks, including: (1) query and target sequence database management, (2) automated high-throughput BLAST searching, (3) indexing and searching of results, (4) filtering results online, (5) managing results of personal interest in favorite categories, (6) automated sequence annotation (such as NCBI NR and ontology-based annotation). PLAN integrates, by default, the Decypher hardware-based BLAST solution provided by Active Motif Inc. with a greatly improved efficiency over conventional BLAST software. BLAST results are visualized by spreadsheets and graphs and are full-text searchable. BLAST results and sequence annotations can be exported, in part or in full, in various formats including Microsoft Excel and FASTA. Sequences and BLAST results are organized in projects, the data publication levels of which are controlled by the registered project owners. In addition, all analytical functions are provided to public users without registration. Conclusion PLAN has proved a valuable addition to the community for automated high-throughput BLAST searches, and, more importantly, for knowledge discovery, management and sharing based on sequence alignment results. The PLAN web interface is platform-independent, easily configurable and capable of comprehensive expansion, and user-intuitive. PLAN is freely available to academic users at . The source code for local deployment is provided under free license. Full support on system utilization, installation, configuration and customization are provided to academic users. PMID:17291345
Improving Hospital Discharge Planning for Elderly Patients
Potthoff, Sandra; Kane, Robert L.; Franco, Sheila J.
1997-01-01
Hospital discharge planning has become increasingly important in an era of prospective payment and managed care. Given the changes in tasks, decisions, and environments involved, it is important to identify how to move such planning from an art to an empirically based decisionmaking process. The authors use a decision-sciences framework to review the state-of-the-art of hospital discharge planning and to suggest methods for improvement. PMID:10345406
Simulation-based modeling of building complexes construction management
NASA Astrophysics Data System (ADS)
Shepelev, Aleksandr; Severova, Galina; Potashova, Irina
2018-03-01
The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.
Zero-Base Budgeting: A Management Tool for School Districts.
ERIC Educational Resources Information Center
Bliss, Sam W.
To help school managers make more efficient use of educational resources, this handbook discusses and describes zero-base budgeting (ZBB). After a brief introductory chapter, the author explores the nature and characteristics of ZBB, gives a little of its historical background, notes its relationship to planning and to educational accountability,…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
...; Submission to the Office of Management and Budget for Review and Approval; Comment Request: Federal Family... of Collection: Federal Family Education Loan (FFEL) Program Income Based Repayment (IBR) Plan Request... Loan) and Federal Family Education Loan (FFEL) Programs may request an Income-Based or Income...
School-Based Management and Accountability Procedures Manual
ERIC Educational Resources Information Center
North Carolina Department of Public Instruction, 2004
2004-01-01
From the mission, several principles were developed to guide the School-Based Management and Accountability Program (the ABCs). (1) The ABCs sets standards for student performance and growth in the basics that are the foundation for further learning and achievement; (2) The accountability system in the ABCs plan is designed to result in improved…
School-Based Management: Promise and Process. CPRE Finance Briefs.
ERIC Educational Resources Information Center
Wohlstetter, Priscilla; Mohrman, Susan Albers
This publication summarizes research that investigated how school-based management (SBM) can be implemented for long-term school improvement. It is argued that a successful SBM plan must be part of a quest for improvement and utilize a "high involvement" model. In addition to having more power, schools need knowledge of the organization,…
Dengue Contingency Planning: From Research to Policy and Practice
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini
2016-01-01
Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan. PMID:27653786
NASA Technical Reports Server (NTRS)
Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)
2009-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.
Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan
NASA Technical Reports Server (NTRS)
1972-01-01
A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.
Use of Knowledge Base Systems (EMDS) in Strategic and Tactical Forest Planning
NASA Astrophysics Data System (ADS)
Jensen, M. E.; Reynolds, K.; Stockmann, K.
2008-12-01
The USDA Forest Service 2008 Planning Rule requires Forest plans to provide a strategic vision for maintaining the sustainability of ecological, economic, and social systems across USFS lands through the identification of desired conditions and objectives. In this paper we show how knowledge-based systems can be efficiently used to evaluate disparate natural resource information to assess desired conditions and related objectives in Forest planning. We use the Ecosystem Management Decision Support (EMDS) system (http://www.institute.redlands.edu/emds/), which facilitates development of both logic-based models for evaluating ecosystem sustainability (desired conditions) and decision models to identify priority areas for integrated landscape restoration (objectives). The study area for our analysis spans 1,057 subwatersheds within western Montana and northern Idaho. Results of our study suggest that knowledge-based systems such as EMDS are well suited to both strategic and tactical planning and that the following points merit consideration in future National Forest (and other land management) planning efforts: 1) Logic models provide a consistent, transparent, and reproducible method for evaluating broad propositions about ecosystem sustainability such as: are watershed integrity, ecosystem and species diversity, social opportunities, and economic integrity in good shape across a planning area? The ability to evaluate such propositions in a formal logic framework also allows users the opportunity to evaluate statistical changes in outcomes over time, which could be very useful for regional and national reporting purposes and for addressing litigation; 2) The use of logic and decision models in strategic and tactical Forest planning provides a repository for expert knowledge (corporate memory) that is critical to the evaluation and management of ecosystem sustainability over time. This is especially true for the USFS and other federal resource agencies, which are likely to experience rapid turnover in tenured resource specialist positions within the next five years due to retirements; 3) Use of logic model output in decision models is an efficient method for synthesizing the typically large amounts of information needed to support integrated landscape restoration. Moreover, use of logic and decision models to design customized scenarios for integrated landscape restoration, as we have demonstrated with EMDS, offers substantial improvements to traditional GIS-based procedures such as suitability analysis. To our knowledge, this study represents the first attempt to link evaluations of desired conditions for ecosystem sustainability in strategic planning to tactical planning regarding the location of subwatersheds that best meet the objectives of integrated landscape restoration. The basic knowledge-based approach implemented in EMDS, with its logic (NetWeaver) and decision (Criterion Decision Plus) engines, is well suited both to multi-scale strategic planning and to multi-resource tactical planning.
Jarmain, Sarah
2016-01-01
The World Health Organization (WHO) defines health human resource planning as "the process of estimating the number of persons and the kinds of knowledge, skills, and attitudes they need to achieve predetermined health targets and ultimately health status objectives" (OHA 2015). Health human resource planning is a critical component of successful organizational and system transformation, and yet little has been written on how to do this for physicians at the local level. This paper will outline a framework for developing and managing key aspects of physician human resource planning related to both the quantity and quality of work within a hospital setting. Using the example of a complex multiphase hospital-based mental health transformation that involved both the reduction and divestment of beds and services, we will outline how we managed the physician human resource aspects to establish the number of psychiatrists needed and the desired attributes of those psychiatrists, and how we helped an existing workforce transition to meet the new expectations. The paper will describe a process for strategically aligning the selection and management of physicians to meet organizational vision and mandate.
36 CFR 219.2 - Levels of planning and responsible officials.
Code of Federal Regulations, 2012 CFR
2012-07-01
... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...
ERIC Educational Resources Information Center
Wang, Yen-Zen
In the current climate of rapid technological advance and social value change, many have suggested that schools should use a school-based approach to curriculum planning. How to design such a curriculum in order to train graduates suited for employment has become an important issue. Many domestic and international enterprises have successfully…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for vehicle and mobile equipment mechanics I and II. Presented first are a…
Implementation of a Project Management Office (PMO)--experiences from year 1.
Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann
2006-01-01
Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.
Planning and Resource Management in an Intelligent Automated Power Management System
NASA Technical Reports Server (NTRS)
Morris, Robert A.
1991-01-01
Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.
Reducing environmental noise impacts: A USAREUR noise management program handbook
NASA Astrophysics Data System (ADS)
Feather, Timothy D.; Shekell, Ted K.
1991-06-01
Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.
Horne, Avril C; Szemis, Joanna M; Webb, J Angus; Kaur, Simranjit; Stewardson, Michael J; Bond, Nick; Nathan, Rory
2018-03-01
One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.
A farm-level precision land management framework based on integer programming
Li, Qi; Hu, Guiping; Jubery, Talukder Zaki; Ganapathysubramanian, Baskar
2017-01-01
Farmland management involves several planning and decision making tasks including seed selection and irrigation management. A farm-level precision farmland management model based on mixed integer linear programming is proposed in this study. Optimal decisions are designed for pre-season planning of crops and irrigation water allocation. The model captures the effect of size and shape of decision scale as well as special irrigation patterns. The authors illustrate the model with a case study on a farm in the state of California in the U.S. and show the model can capture the impact of precision farm management on profitability. The results show that threefold increase of annual net profit for farmers could be achieved by carefully choosing irrigation and seed selection. Although farmers could increase profits by applying precision management to seed or irrigation alone, profit increase is more significant if farmers apply precision management on seed and irrigation simultaneously. The proposed model can also serve as a risk analysis tool for farmers facing seasonal irrigation water limits as well as a quantitative tool to explore the impact of precision agriculture. PMID:28346499
NASA Astrophysics Data System (ADS)
Horne, Avril C.; Szemis, Joanna M.; Webb, J. Angus; Kaur, Simranjit; Stewardson, Michael J.; Bond, Nick; Nathan, Rory
2018-03-01
One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.
The intersection of trust and recreation management
Patricia L. Winter; George T. Cvetkovich
2013-01-01
The management of public land as venues for a wide variety of outdoor recreation interests is a highly complex professional field. Understanding of the relationship between the visitor, general public values, the natural resource base and the politics of management policies requires training, experience and savvy. Recreation planning for forest, park, preserve,...
Action Regulation Theory and Career Self-Management
ERIC Educational Resources Information Center
Raabe, Babette; Frese, Michael; Beehr, Terry A.
2007-01-01
Much of the responsibility for managing careers is shifting from employers to adaptive and proactive employees. A career management intervention based on action regulation theory trained 205 white collar employees to engage actively in their own career building by increasing their self-knowledge, career goal commitment, and career plan quality. As…
Steven E. Smith; Ma.G. Mendoza; Gerardo Zuniga; Kandres Kalbrook; J.L. Hayes; D.N. Byrne
2013-01-01
Understanding the distribution of key biotic elements of forest ecosystems is essential in contemporary forest management and in planning to meet future management needs. Habitat distribution (niche) models based on known occurrences provide geographical structure for such management as the environmental factors change....
Ecosystem-based management practices, along with coastal and marine spatial planning, have been adopted as foundational principles for ocean management in the United States. The success of these practices depends in large measure on a solid foundation of biogeographical informati...
78 FR 4391 - New England Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... current management system based on days-at-sea (DAS) and trip limits. These changes may include adoption of a DAS leasing program, and in that context, the NMFS Regional Office staff will give a presentation on the DAS leasing program adopted in the Northeast Multispecies Fishery Management Plan. The...
Watershed and stormwater managers need modeling tools to evaluate alternative plans for water quality management and flow abatement techniques in urban and developing areas. A watershed-scale, decision-support framework that is based on cost optimization is needed to support gov...
Integrated Rangeland Fire Management Strategy Actionable Science Plan Team
2016-01-01
The Integrated Rangeland Fire Management Strategy (hereafter Strategy, DOI 2015) outlined the need for coordinated, science-based adaptive management to achieve long-term protection, conservation, and restoration of the sagebrush (Artemisia spp.) ecosystem. A key component of this management approach is the identification of knowledge gaps that limit...
Information needs for natural fire management planning
Parsons, David; Bancroft, Larry; Nichols, Thomas; Stohlgren, Thomas
1985-01-01
The development and implementation of an effective natural fire management program require a clear definition of goals and objectives, an ever-expanding information base, and effective program evaluation. Examples are given from Sequoia and Kings Canyon National Parks.
Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans
NASA Astrophysics Data System (ADS)
Neuhold, Clemens
2013-04-01
he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time-step addresses different administrative levels and spatial scales accompanied by the active involvement of interested parties.
76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...
Artificial Intelligent Platform as Decision Tool for Asset Management, Operations and Maintenance.
2018-01-04
An Artificial Intelligence (AI) system has been developed and implemented for water, wastewater and reuse plants to improve management of sensors, short and long term maintenance plans, asset and investment management plans. It is based on an integrated approach to capture data from different computer systems and files. It adds a layer of intelligence to the data. It serves as a repository of key current and future operations and maintenance conditions that a plant needs have knowledge of. With this information, it is able to simulate the configuration of processes and assets for those conditions to improve or optimize operations, maintenance and asset management, using the IViewOps (Intelligent View of Operations) model. Based on the optimization through model runs, it is able to create output files that can feed data to other systems and inform the staff regarding optimal solutions to the conditions experienced or anticipated in the future.
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
Health Promotion Interventions for Low-Income Californians Through Medi-Cal Managed Care Plans, 2012
Kohatsu, Neal D.; Paciotti, Brian M.; Byrne, Jennifer V.; Kizer, Kenneth W.
2015-01-01
Introduction Prevention is the most cost-effective approach to promote population health, yet little is known about the delivery of health promotion interventions in the nation’s largest Medicaid program, Medi-Cal. The purpose of this study was to inventory health promotion interventions delivered through Medi-Cal Managed Care Plans; identify attributes of the interventions that plans judged to have the greatest impact on their members; and determine the extent to which the plans refer members to community assistance programs and sponsor health-promoting community activities. Methods The lead health educator from each managed care plan was asked to complete a 190-item online survey in January 2013; 20 of 21 managed care plans responded. Survey data on the health promotion interventions with the greatest impact were grouped according to intervention attributes and measures of effectiveness; quantitative data were analyzed using descriptive statistics. Results Health promotion interventions judged to have the greatest impact on Medi-Cal members were delivered in various ways; educational materials, one-on-one education, and group classes were delivered most frequently. Behavior change, knowledge gain, and improved disease management were cited most often as measures of effectiveness. Across all interventions, median educational hours were limited (2.4 h), and median Medi-Cal member participation was low (265 members per intervention). Most interventions with greatest impact (120 of 137 [88%]) focused on tertiary prevention. There were mixed results in referring members to community assistance programs and investing in community activities. Conclusion Managed care plans have many opportunities to more effectively deliver health promotion interventions. Establishing measurable, evidence-based, consensus standards for such programs could facilitate improved delivery of these services. PMID:26564012
36 CFR 219.20 - Ecological sustainability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PLANNING National Forest System Land and Resource Management Planning Ecological, Social, and Economic..., as appropriate, assessments of the risks to species viability and the identification of ecological conditions needed to maintain species viability over time based on the following: (A) The viability of each...
36 CFR 219.20 - Ecological sustainability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... PLANNING National Forest System Land and Resource Management Planning Ecological, Social, and Economic..., as appropriate, assessments of the risks to species viability and the identification of ecological conditions needed to maintain species viability over time based on the following: (A) The viability of each...
46 CFR 62.20-3 - Plans for information.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-based system hardware. (3) Safety controls. (4) Automated electric power management. (5) Automation... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Plan... Officer in Charge, Marine Inspection, for use in the evaluation of automated systems provided to replace...
Nguyen, Thanh-Nghia; Trocio, Jeffrey; Kowal, Stacey; Ferrufino, Cheryl P; Munakata, Julie; South, Dell
2016-12-01
Health management is becoming increasingly complex, given a range of care options and the need to balance costs and quality. The ability to measure and understand drivers of costs is critical for healthcare organizations to effectively manage their patient populations. Healthcare decision makers can leverage real-world evidence to explore the value of disease-management interventions in shifting total cost trends. To develop a real-world, evidence-based estimator that examines the impact of disease-management interventions on the total cost of care (TCoC) for a patient population with nonvalvular atrial fibrillation (NVAF). Data were collected from a patient-level real-world evidence data set that uses the IMS PharMetrics Health Plan Claims Database. Pharmacy and medical claims for patients meeting the inclusion or exclusion criteria were combined in longitudinal cohorts with a 180-day preindex and 360-day follow-up period. Descriptive statistics, such as mean and median patient costs and event rates, were derived from a real-world evidence analysis and were used to populate the base-case estimates within the TCoC estimator, an exploratory economic model that was designed to estimate the potential impact of several disease-management activities on the TCoC for a patient population with NVAF. Using Microsoft Excel, the estimator is designed to compare current direct costs of medical care to projected costs by varying assumptions on the impact of disease-management activities and applying the associated changes in cost trends to the affected populations. Disease-management levers are derived from literature-based concepts affecting costs along the NVAF disease continuum. The use of the estimator supports analyses across 4 US geographic regions, age, cost types, and care settings during 1 year. All patients included in the study were continuously enrolled in their health plan (within the IMS PharMetrics Health Plan Claims Database) between July 1, 2010, and June 30, 2012. Patients were included in the final analytic file and were indexed based on (1) the service date of the first claim within the selection window (December 28, 2010-July 11, 2011) with a diagnosis of NVAF, or (2) the service date of the second claim for an NVAF medication of interest during the same selection window. The model estimates the current trends in national benchmark data for a hypothetical health plan with 1 million covered lives. The annual total direct healthcare costs (allowable and patient out-of-pocket costs) of managing patients with NVAF in this hypothetical plan are estimated at $184,981,245 ($25,754 per patient, for 7183 patients). A potential 25% improvement from the base-case disease burden and disease management could translate into TCoC savings from reducing the excess costs related to hypertension (-5.3%) and supporting the use of an appropriate antithrombotic treatment that prevents ischemic stroke (-0.7%) and reduces bleeding events (-0.1%). The use of the TCoC estimator supports population health management by providing real-world evidence benchmark data on NVAF disease burden and by quantifying the potential value of disease-management activities in shifting cost trends.
Nguyen, Thanh-Nghia; Trocio, Jeffrey; Kowal, Stacey; Ferrufino, Cheryl P.; Munakata, Julie; South, Dell
2016-01-01
Background Health management is becoming increasingly complex, given a range of care options and the need to balance costs and quality. The ability to measure and understand drivers of costs is critical for healthcare organizations to effectively manage their patient populations. Healthcare decision makers can leverage real-world evidence to explore the value of disease-management interventions in shifting total cost trends. Objective To develop a real-world, evidence-based estimator that examines the impact of disease-management interventions on the total cost of care (TCoC) for a patient population with nonvalvular atrial fibrillation (NVAF). Methods Data were collected from a patient-level real-world evidence data set that uses the IMS PharMetrics Health Plan Claims Database. Pharmacy and medical claims for patients meeting the inclusion or exclusion criteria were combined in longitudinal cohorts with a 180-day preindex and 360-day follow-up period. Descriptive statistics, such as mean and median patient costs and event rates, were derived from a real-world evidence analysis and were used to populate the base-case estimates within the TCoC estimator, an exploratory economic model that was designed to estimate the potential impact of several disease-management activities on the TCoC for a patient population with NVAF. Using Microsoft Excel, the estimator is designed to compare current direct costs of medical care to projected costs by varying assumptions on the impact of disease-management activities and applying the associated changes in cost trends to the affected populations. Disease-management levers are derived from literature-based concepts affecting costs along the NVAF disease continuum. The use of the estimator supports analyses across 4 US geographic regions, age, cost types, and care settings during 1 year. Results All patients included in the study were continuously enrolled in their health plan (within the IMS PharMetrics Health Plan Claims Database) between July 1, 2010, and June 30, 2012. Patients were included in the final analytic file and were indexed based on (1) the service date of the first claim within the selection window (December 28, 2010-July 11, 2011) with a diagnosis of NVAF, or (2) the service date of the second claim for an NVAF medication of interest during the same selection window. The model estimates the current trends in national benchmark data for a hypothetical health plan with 1 million covered lives. The annual total direct healthcare costs (allowable and patient out-of-pocket costs) of managing patients with NVAF in this hypothetical plan are estimated at $184,981,245 ($25,754 per patient, for 7183 patients). A potential 25% improvement from the base-case disease burden and disease management could translate into TCoC savings from reducing the excess costs related to hypertension (−5.3%) and supporting the use of an appropriate antithrombotic treatment that prevents ischemic stroke (−0.7%) and reduces bleeding events (−0.1%). Conclusions The use of the TCoC estimator supports population health management by providing real-world evidence benchmark data on NVAF disease burden and by quantifying the potential value of disease-management activities in shifting cost trends. PMID:28465775
Buchmueller, Thomas C
2009-12-01
For many years, leading health care reform proposals have been based on market-oriented strategies. In the 1990s, a number of reform proposals were built around the concept of "managed competition," but more recently, "consumer-directed health care" models have received attention. Although price-conscious consumer demand plays a critical role in both the managed competition and consumer-directed health care models, the two strategies are based on different visions of the health care marketplace and the best way to use market forces to achieve greater systemwide efficiencies. This article reviews the research literature that tests the main hypotheses concerning the two policy strategies. Numerous studies provide consistent evidence that consumers' health plan choices are sensitive to out-of-pocket premiums. The elasticity of demand appears to vary with consumers' health risk, with younger, healthier individuals being more price sensitive. This heterogeneity increases the potential for adverse selection. Biased risk selection also is a concern when the menu of health plan options includes consumer-directed health plans. Several studies confirm that such plans tend to attract healthier enrollees. A smaller number of studies test the main hypothesis regarding consumer-directed health plans, which is that they result in lower medical spending than do more generous plans. These studies find little support for this claim. The experiences of employers that have adopted key elements of managed competition are generally consistent with the key hypotheses underlying that strategy. Research in this area, however, has focused on only a narrow range of questions. Because consumer-directed health care is such a recent phenomenon, research on this strategy is even more limited. Additional studies on both topics would be valuable.
Buchmueller, Thomas C
2009-01-01
Context: For many years, leading health care reform proposals have been based on market-oriented strategies. In the 1990s, a number of reform proposals were built around the concept of “managed competition,” but more recently, “consumer-directed health care” models have received attention. Although price-conscious consumer demand plays a critical role in both the managed competition and consumer-directed health care models, the two strategies are based on different visions of the health care marketplace and the best way to use market forces to achieve greater systemwide efficiencies. Methods: This article reviews the research literature that tests the main hypotheses concerning the two policy strategies. Findings: Numerous studies provide consistent evidence that consumers’ health plan choices are sensitive to out-of-pocket premiums. The elasticity of demand appears to vary with consumers’ health risk, with younger, healthier individuals being more price sensitive. This heterogeneity increases the potential for adverse selection. Biased risk selection also is a concern when the menu of health plan options includes consumer-directed health plans. Several studies confirm that such plans tend to attract healthier enrollees. A smaller number of studies test the main hypothesis regarding consumer-directed health plans, which is that they result in lower medical spending than do more generous plans. These studies find little support for this claim. Conclusions: The experiences of employers that have adopted key elements of managed competition are generally consistent with the key hypotheses underlying that strategy. Research in this area, however, has focused on only a narrow range of questions. Because consumer-directed health care is such a recent phenomenon, research on this strategy is even more limited. Additional studies on both topics would be valuable. PMID:20021587
NASA Astrophysics Data System (ADS)
Liang, Likai; Bi, Yushen
Considered on the distributed network management system's demand of high distributives, extensibility and reusability, a framework model of Three-tier distributed network management system based on COM/COM+ and DNA is proposed, which adopts software component technology and N-tier application software framework design idea. We also give the concrete design plan of each layer of this model. Finally, we discuss the internal running process of each layer in the distributed network management system's framework model.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
NASA Astrophysics Data System (ADS)
Höllermann, Britta; Evers, Mariele
2017-04-01
Planning and decision-making under uncertainty is common in water management due to climate variability, simplified models, societal developments, planning restrictions just to name a few. Dealing with uncertainty can be approached from two sites, hereby affecting the process and form of communication: Either improve the knowledge base by reducing uncertainties or apply risk-based approaches to acknowledge uncertainties throughout the management process. Current understanding is that science more strongly focusses on the former approach, while policy and practice are more actively applying a risk-based approach to handle incomplete and/or ambiguous information. The focus of this study is on how water managers perceive and handle uncertainties at the knowledge/decision interface in their daily planning and decision-making routines. How they evaluate the role of uncertainties for their decisions and how they integrate this information into the decision-making process. Expert interviews and questionnaires among practitioners and scientists provided an insight into their perspectives on uncertainty handling allowing a comparison of diverse strategies between science and practice as well as between different types of practitioners. Our results confirmed the practitioners' bottom up approach from potential measures upwards instead of impact assessment downwards common in science-based approaches. This science-practice gap may hinder effective uncertainty integration and acknowledgement in final decisions. Additionally, the implementation of an adaptive and flexible management approach acknowledging uncertainties is often stalled by rigid regulations favouring a predict-and-control attitude. However, the study showed that practitioners' level of uncertainty recognition varies with respect to his or her affiliation to type of employer and business unit, hence, affecting the degree of the science-practice-gap with respect to uncertainty recognition. The level of working experience was examined as a cross-cutting property of science and practice with increasing levels of uncertainty awareness and integration among more experienced researchers and practitioners. In conclusion, our study of water managers' perception and handling of uncertainties provides valuable insights for finding routines for uncertainty communication and integration into planning and decision-making processes by acknowledging the divers perceptions among producers, users and receivers of uncertainty information. These results can contribute to more effective integration of hydrological forecast and improved decisions.
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
Blood management issues using blood management strategies.
Stulberg, Bernard N; Zadzilka, Jayson D
2007-06-01
Blood management strategies is a term used to address a coordinated approach to the management of blood loss in the perioperative period for total joint arthroplasty. The premise of any blood management strategy is that each patient, surgeon, and operative intervention experiences different risks of requiring transfusion, that those risks can be identified, and that a plan can be implemented to address them. A surgeon's decision to transfuse should be based on physiologic assessment of the patient's response to anemia and not on an arbitrary number ("transfusion trigger"). Intervention strategies can be applied preoperatively, intraoperatively, and postoperatively. Patient-specific planning allows for the appropriate use of patient, hospital, and system resources, ensuring that the consequences of anemia are minimized and that the patient's recovery process is optimized.
Chou, Roger; Gordon, Debra B; de Leon-Casasola, Oscar A; Rosenberg, Jack M; Bickler, Stephen; Brennan, Tim; Carter, Todd; Cassidy, Carla L; Chittenden, Eva Hall; Degenhardt, Ernest; Griffith, Scott; Manworren, Renee; McCarberg, Bill; Montgomery, Robert; Murphy, Jamie; Perkal, Melissa F; Suresh, Santhanam; Sluka, Kathleen; Strassels, Scott; Thirlby, Richard; Viscusi, Eugene; Walco, Gary A; Warner, Lisa; Weisman, Steven J; Wu, Christopher L
2016-02-01
Most patients who undergo surgical procedures experience acute postoperative pain, but evidence suggests that less than half report adequate postoperative pain relief. Many preoperative, intraoperative, and postoperative interventions and management strategies are available for reducing and managing postoperative pain. The American Pain Society, with input from the American Society of Anesthesiologists, commissioned an interdisciplinary expert panel to develop a clinical practice guideline to promote evidence-based, effective, and safer postoperative pain management in children and adults. The guideline was subsequently approved by the American Society for Regional Anesthesia. As part of the guideline development process, a systematic review was commissioned on various aspects related to various interventions and management strategies for postoperative pain. After a review of the evidence, the expert panel formulated recommendations that addressed various aspects of postoperative pain management, including preoperative education, perioperative pain management planning, use of different pharmacological and nonpharmacological modalities, organizational policies, and transition to outpatient care. The recommendations are based on the underlying premise that optimal management begins in the preoperative period with an assessment of the patient and development of a plan of care tailored to the individual and the surgical procedure involved. The panel found that evidence supports the use of multimodal regimens in many situations, although the exact components of effective multimodal care will vary depending on the patient, setting, and surgical procedure. Although these guidelines are based on a systematic review of the evidence on management of postoperative pain, the panel identified numerous research gaps. Of 32 recommendations, 4 were assessed as being supported by high-quality evidence, and 11 (in the areas of patient education and perioperative planning, patient assessment, organizational structures and policies, and transitioning to outpatient care) were made on the basis of low-quality evidence. This guideline, on the basis of a systematic review of the evidence on postoperative pain management, provides recommendations developed by a multidisciplinary expert panel. Safe and effective postoperative pain management should be on the basis of a plan of care tailored to the individual and the surgical procedure involved, and multimodal regimens are recommended in many situations. Copyright © 2016 American Pain Society. Published by Elsevier Inc. All rights reserved.
Management of victims of urban chemical attack: the French approach.
Laurent, J F; Richter, F; Michel, A
1999-10-01
Since the early 1980s several disasters involving mass release of toxic substances have focused the attention of different administrations and the fire services into producing protocols and guidelines for action in civilian situations. The bomb attack in the Tokyo subway, in March 1995, made it clear that a terrorist attack using highly toxic agents is now feasible. Management of disasters in the civil sector in France is based upon two interlinked plans: the Red Plan, which covers on-site organisation, and the White Plan, which concerns the interface with hospital services. Special procedures have been developed to adapt the Red and White Plans for use in the event of toxic attack and concern the deployment of emergency responding personnel, the provision of life support and antidotes in the contaminated zone, the prevention of secondary contamination and the transport and reception of victims at the hospital. Based on the established principle of pre-hospital resuscitation and well-tried assistance plans, this doctrine allows a safe and effective response to terrorist attacks as well as to other toxic release incidents.
Ramnarayan, Padmanabhan; Kapoor, Ritika R; Coren, Michael; Nanduri, Vasantha; Tomlinson, Amanda L; Taylor, Paul M; Wyatt, Jeremy C; Britto, Joseph F
2003-01-01
Few previous studies evaluating the benefits of diagnostic decision support systems have simultaneously measured changes in diagnostic quality and clinical management prompted by use of the system. This report describes a reliable and valid scoring technique to measure the quality of clinical decision plans in an acute medical setting, where diagnostic decision support tools might prove most useful. Sets of differential diagnoses and clinical management plans generated by 71 clinicians for six simulated cases, before and after decision support from a Web-based pediatric differential diagnostic tool (ISABEL), were used. A composite quality score was calculated separately for each diagnostic and management plan by considering the appropriateness value of each component diagnostic or management suggestion, a weighted sum of individual suggestion ratings, relevance of the entire plan, and its comprehensiveness. The reliability and validity (face, concurrent, construct, and content) of these two final scores were examined. Two hundred fifty-two diagnostic and 350 management suggestions were included in the interrater reliability analysis. There was good agreement between raters (intraclass correlation coefficient, 0.79 for diagnoses, and 0.72 for management). No counterintuitive scores were demonstrated on visual inspection of the sets. Content validity was verified by a consultation process with pediatricians. Both scores discriminated adequately between the plans of consultants and medical students and correlated well with clinicians' subjective opinions of overall plan quality (Spearman rho 0.65, p < 0.01). The diagnostic and management scores for each episode showed moderate correlation (r = 0.51). The scores described can be used as key outcome measures in a larger study to fully assess the value of diagnostic decision aids, such as the ISABEL system.
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
40 CFR 60.2620 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Artmann, Martina, E-mail: m.artmann@ioer.de
Managing urban soil sealing is a difficult venture due to its spatial heterogeneity and embedding in a socio-ecological system. A systemic solution is needed to tackle its spatial, ecological and social sub-systems. This study develops a guideline for urban actors to find a systemic solution to soil sealing management based on two case studies in Germany: Munich and Leipzig. Legal-planning, informal-planning, economic-fiscal, co-operative and informational responses were evaluated by indicators to proof which strategy considers the spatial complexity of urban soil sealing (systemic spatial efficiency) and, while considering spatial complexity, to assess what the key management areas for action aremore » to reduce the ecological impacts by urban soil sealing (ecological impact efficiency) and to support an efficient implementation by urban actors (social implementation efficiency). Results suggest framing the systemic solution to soil sealing management through a cross-scale, legal-planning development strategy embedded in higher European policies. Within the socio-ecological system, the key management area for action should focus on the protection of green infrastructure being of high value for actors from the European to local scales. Further efforts are necessary to establish a systemic monitoring concept to optimize socio-ecological benefits and avoid trade-offs such as between urban infill development and urban green protection. This place-based study can be regarded as a stepping stone on how to develop systemic strategies by considering different spatial sub-targets and socio-ecological systems. - Highlights: • Urban soil sealing management is spatially complex. • The legal-planning strategy supports a systemic sealing management. • Urban green infrastructure protection should be in the management focus. • Soil protection requires policies from higher levels of government. • A systemic urban soil sealing monitoring concept is needed.« less
[Lean logistics management in healthcare: a case study].
Aguilar-Escobar, V G; Garrido-Vega, P
2013-01-01
To study the applicability of the principles of Lean Production to manage the supply chain of a hospital. In particular, to determine which Lean practices and principles are applicable, the benefits obtained and the main barriers for its implementation. Managing the hospital supply chain is an important issue, both for its effect on the quality of care and its impact on costs. This study is based on a case study. 2005-10. Hospital Virgen Macarena in Seville. Process of implementing a comprehensive logistics management plan based on Lean principles and technological investments. The implementation of the comprehensive plan has reduced inventory, decreased lead times and improved service quality. Also, there have been other important improvements: enhanced employee satisfaction and increased staff productivity, both dedicated to health and the logistics. The experience analysed has shown the applicability and appropriateness of Lean principles and some of its techniques in managing the logistics of hospitals. It also identifies some of the main difficulties that may arise. Copyright © 2011 SECA. Published by Elsevier Espana. All rights reserved.
Production roll out plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less
Advanced consequence management program: challenges and recent real-world implementations
NASA Astrophysics Data System (ADS)
Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.
2002-08-01
The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.
A Mode of Combined ERP and KMS Knowledge Management System Construction
NASA Astrophysics Data System (ADS)
Yuena, Kang; Yangeng, Wen; Qun, Zhou
The core of ERP and knowledge management is quite similar; both will send appropriate knowledge (goods, funds) to the right people (position) at the right time. It is reasonable to believe that increase the knowledge management system in ERP will help companies achieve their goals better. This paper compares the concept of logical point of hall three-dimensional structure of the knowledge management system and the ERP in methodology level. And found they are very similar in the time dimension, logic dimension and knowledge dimension. This laid the basis of methodology in the simultaneous planning, implementation and applications. And then proposed a knowledge-based ERP Multi-Agent Management System Model. Finally, the paper described the process from planning to implementation of knowledge management ERP system with multi-Agent interaction and impact from three concepts, management thinking, software and system.
2017-03-31
requirements based on valid, approved workload. • Link peacetime and mobilization manpower requirements. 16 Moreover, the purpose of the SMRD is to... research and policy; energy and environment; manpower management; acquisition and cost; infrastructure; and military readiness . CPP-2017 -U-015038-Final...CNA ANALYSIS & SOLUTIONS 31st March 2017 Subject: NAVY MANPOWER PLANNING MONOGRAPH Navy manpower planning is a rich and complex topic that has a
Considerations for planning and conducting clinic-based research in physical therapy.
Fitzgerald, G K; Delitto, A
2001-08-01
There is growing demand to increase the volume of clinic-based research in physical therapy. Special considerations, unique to the planning and conduct of clinic-based research, need to be addressed to increase the likelihood that these studies will be completed successfully. The purposes of this perspective are to discuss factors affecting clinic-based research and to offer suggestions for addressing these problems when designing and conducting research studies in a clinical setting. This perspective discusses issues such as patient management, determining the availability of target patient populations, acquiring support from physical therapists and physicians, reporting and managing research-related injury or illness, and modifying or terminating projects. Some of the points made in this perspective are illustrated using examples from the authors' experiences in conducting clinical research.
Optimizing diabetes management: managed care strategies.
Tzeel, E Albert
2013-06-01
Both the prevalence of type 2 diabetes mellitus (DM) and its associated costs have been rising over time and are projected to continue to escalate. Therefore, type 2 DM (T2DM) management costs represent a potentially untenable strain on the healthcare system unless substantial, systemic changes are made. Managed care organizations (MCOs) are uniquely positioned to attempt to make the changes necessary to reduce the burdens associated with T2DM by developing policies that align with evidence-based DM management guidelines and other resources. For example, MCOs can encourage members to implement healthy lifestyle choices, which have been shown to reduce DM-associated mortality and delay comorbidities. In addition, MCOs are exploring the strengths and weaknesses of several different benefit plan designs. Value-based insurance designs, sometimes referred to as value-based benefit designs, use both direct and indirect data to invest in incentives that change behaviors through health information technologies, communications, and services to improve health, productivity, quality, and financial trends. Provider incentive programs, sometimes referred to as "pay for performance," represent a payment/delivery paradigm that places emphasis on rewarding value instead of volume to align financial incentives and quality of care. Accountable care organizations emphasize an alignment between reimbursement and implementation of best practices through the use of disease management and/ or clinical pathways and health information technologies. Consumer-directed health plans, or high-deductible health plans, combine lower premiums with high annual deductibles to encourage members to seek better value for health expenditures. Studies conducted to date on these different designs have produced mixed results.
Comprehensive Fault Tolerance and Science-Optimal Attitude Planning for Spacecraft Applications
NASA Astrophysics Data System (ADS)
Nasir, Ali
Spacecraft operate in a harsh environment, are costly to launch, and experience unavoidable communication delay and bandwidth constraints. These factors motivate the need for effective onboard mission and fault management. This dissertation presents an integrated framework to optimize science goal achievement while identifying and managing encountered faults. Goal-related tasks are defined by pointing the spacecraft instrumentation toward distant targets of scientific interest. The relative value of science data collection is traded with risk of failures to determine an optimal policy for mission execution. Our major innovation in fault detection and reconfiguration is to incorporate fault information obtained from two types of spacecraft models: one based on the dynamics of the spacecraft and the second based on the internal composition of the spacecraft. For fault reconfiguration, we consider possible changes in both dynamics-based control law configuration and the composition-based switching configuration. We formulate our problem as a stochastic sequential decision problem or Markov Decision Process (MDP). To avoid the computational complexity involved in a fully-integrated MDP, we decompose our problem into multiple MDPs. These MDPs include planning MDPs for different fault scenarios, a fault detection MDP based on a logic-based model of spacecraft component and system functionality, an MDP for resolving conflicts between fault information from the logic-based model and the dynamics-based spacecraft models" and the reconfiguration MDP that generates a policy optimized over the relative importance of the mission objectives versus spacecraft safety. Approximate Dynamic Programming (ADP) methods for the decomposition of the planning and fault detection MDPs are applied. To show the performance of the MDP-based frameworks and ADP methods, a suite of spacecraft attitude planning case studies are described. These case studies are used to analyze the content and behavior of computed policies in response to the changes in design parameters. A primary case study is built from the Far Ultraviolet Spectroscopic Explorer (FUSE) mission for which component models and their probabilities of failure are based on realistic mission data. A comparison of our approach with an alternative framework for spacecraft task planning and fault management is presented in the context of the FUSE mission.
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Optimism in Enrollment Management
ERIC Educational Resources Information Center
Buster-Williams, Kimberley
2016-01-01
Enrollment managers, like most managers, have goals that must be focused on with precision, excitement, and vigor. Enrollment managers must excel at enrollment planning. Typically, enrollment planning unites undergraduate and graduate recruitment plans, out-of-state recruitment plans, marketing plans, retention plans, international enrollment…
Conservation plan based on the concept of integrity
NASA Astrophysics Data System (ADS)
Yen, Y. N.; Cheng, C. F.
2015-08-01
Value based concept has been accepted as a universal principle for the conservation of Cultural Heritage. Authenticity and integrity are two main issues protecting those values. Authenticity is the major tool in the value assessment and integrity plays an important role in the procedure of conservation plan. From the perspective of integrity, this research explores the principle of conservation plan and discusses its relation with the restoration plan and urban plan. A conservation plan in Quing-Lin village, Kinmen, will be taken as an example for implementation. The research shows that a conservation plan with integrity in mind helps to clarify the conservation target areas and their buffer zones. It also serves as a tool for developing control and risk management. Cultural mapping is an efficient tool for the communication with stakeholders in the process of the conservation plan.
Waters, Peter M
2015-01-01
The continuing increases in health care expenditures as well as the importance of providing safe, effective, timely, patient-centered care has brought government and commercial payer pressure on hospitals and providers to document the value of the care they deliver. This article introduces work at Boston Children's Hospital on time-driven activity-based accounting to determine cost of care delivery; combined with Systemic Clinical Assessment and Management Plans to reduce variation and improve outcomes. The focus so far has been on distal radius fracture care for children and adolescents.
NASA and the U.S. climate program - A problem in data management
NASA Technical Reports Server (NTRS)
Quann, J. J.
1978-01-01
NASA's contribution to the total data base for the National Climate Plan will be to produce climate data sets from its experimental space observing systems and to maximize the value of these data for climate analysis and prediction. Validated data sets will be provided to NOAA for inclusion into their overall diagnostic data base. NASA data management for the Climate Plan will involve: (1) cataloging and retrieval of large integrated and distributed data sets upon user demand, and (2) the storage equivalent of 100,000 digital data tapes. It will be the largest, most complex data system ever developed by NASA
U.S. EPA's Watershed Management Research Activities
Watershed and stormwater managers need modeling tools to evaluate alternative plans for environmental quality restoration and protection needs in urban and developing areas. A watershed-scale decision-support system, based on cost optimization, provides an essential tool to suppo...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-04
... Amendment will be based on the principles of Adaptive Management. You may submit comments on issues and..., archaeology, paleontology, wildlife and fisheries, hydrology, soils, sociology and economics, and public...
Evacuation transportation management : task five : operational concept.
DOT National Transportation Integrated Search
2009-06-26
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Evacuation transportation management. Task five, Operational concept
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Implementing AIM-based monitoring for natural resource management
USDA-ARS?s Scientific Manuscript database
Successful monitoring programs are built on clearly-defined objectives, thorough planning, and organized implementation. However, natural resource management decisions need to be made at many different organizational levels and scales – from local to national. Developing separate monitoring programs...
44 CFR 351.27 - The Department of Defense.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false The Department of Defense..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS RADIOLOGICAL EMERGENCY PLANNING AND PREPAREDNESS Interagency Assignments § 351.27 The Department of Defense. (a) Determine appropriate planning bases for Department of...
44 CFR 351.27 - The Department of Defense.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false The Department of Defense..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS RADIOLOGICAL EMERGENCY PLANNING AND PREPAREDNESS Interagency Assignments § 351.27 The Department of Defense. (a) Determine appropriate planning bases for Department of...
44 CFR 351.27 - The Department of Defense.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false The Department of Defense..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS RADIOLOGICAL EMERGENCY PLANNING AND PREPAREDNESS Interagency Assignments § 351.27 The Department of Defense. (a) Determine appropriate planning bases for Department of...
44 CFR 351.27 - The Department of Defense.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false The Department of Defense..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS RADIOLOGICAL EMERGENCY PLANNING AND PREPAREDNESS Interagency Assignments § 351.27 The Department of Defense. (a) Determine appropriate planning bases for Department of...
Emergency Administration and Planning Institute.
ERIC Educational Resources Information Center
Reed, Robert R.
The Emergency Administration and Planning program at the University of North Texas (Denton) is the only undergraduate degree-granting program in emergency management and training in the country. It is a 128-hour program based on a public administration curriculum, with additional coursework in behavioral analysis, sociology, rehabilitative…
Resources planning for radiological incidents management
NASA Astrophysics Data System (ADS)
Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.
2017-01-01
Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.
Project Scheduling Based on Risk of Gas Transmission Pipe
NASA Astrophysics Data System (ADS)
Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.
2018-03-01
The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.
Multi-Criteria GIS Analyses with the Use of Uavs for the Needs of Spatial Planning
NASA Astrophysics Data System (ADS)
Zawieska, D.; Markiewicz, J.; Turek, A.; Bakuła, K.; Kowalczyk, M.; Kurczyński, Z.; Ostrowski, W.; Podlasiak, P.
2016-06-01
Utilization of Unmanned Aerial Systems (UAVs) in agriculture, forestry, or other environmental contexts has recently become common. However, in the case of spatial planning, the role of UAVs still seems to be underestimated. At present, sections of municipal development use UAVs mainly for promotional purposes (films, folders, brochures, etc.). The use of UAVs for spatial management provides results, first of all, in the form of savings in human resources and time; however, more frequently, it is also connected with financial savings (given the decreasing cost of UAVs and photogrammetric software). The performed research presented here relates to the possibilities of using UAVs to update planning documents, and, in particular, to update the study of conditions and directions of spatial management and preparation of local plans for physical management. Based on acquired photographs with a resolution of 3 cm, a cloud of points is generated, as well as 3D models and the true orthophotomap. These data allow multi-criteria spatial analyses. Additionally, directions of development and changes in physical management are analysed for the given area.
A patient centered care plan in the EHR: improving collaboration and engagement.
Chunchu, Kavitha; Mauksch, Larry; Charles, Carol; Ross, Valerie; Pauwels, Judith
2012-09-01
Patients attempting to manage their chronic conditions require ongoing support in changing and adopting self-management behaviors. However, patient values, health goals, and action plans are not well represented in the electronic health record (EHR) impeding the ability of the team (MA and providers) to provide respectful, ongoing self-management support. We evaluated whether a team approach to using an EHR based patient centered care plan (PCCP) improved collaborative self-management planning. An experimental, prospective cohort study was conducted in a family medicine residency clinic. The experimental group included 7 physicians and a medical assistant who received 2 hr of PCCP training. The control group consisted of 7 physicians and a medical assistant. EHR charts were analyzed for evidence of 8 behavior change elements. Follow-up interviews with experimental group patients and physicians and the medical assistant assessed their experiences. We found that PCCP charts had more documented behavior change elements than control charts in all 8 domains (p < .001). Experimental group physicians valued the PCCP model and suggested ways to improve its use. Patient feedback demonstrated support for the model. A PCCP can help team members to engage patients with chronic illnesses in goal setting and action planning to support self-management. An EHR design that stores patient values, health goals, and action plans may strengthen continuity and quality of care between patients and primary care team members. (PsycINFO Database Record (c) 2012 APA, all rights reserved).
Tree injury and mortality in fires: developing process-based models
Bret W. Butler; Matthew B. Dickinson
2010-01-01
Wildland fire managers are often required to predict tree injury and mortality when planning a prescribed burn or when considering wildfire management options; and, currently, statistical models based on post-fire observations are the only tools available for this purpose. Implicit in the derivation of statistical models is the assumption that they are strictly...
ERIC Educational Resources Information Center
Jobes, David A.
2012-01-01
The Collaborative Assessment and Management of Suicidality (CAMS) is an evidence-based clinical intervention that has significantly evolved over 25 years of clinical research. CAMS is best understood as a therapeutic framework that emphasizes a unique collaborative assessment and treatment planning process between the suicidal patient and…
Improving applicant interviewing--using a behavioral-based questioning approach.
Strasser, Patricia B
2005-04-01
Selecting the correct person for the job is crucial for occupational health nurse managers. A successful interview takes time to prepare and implement. A structured, well-planned interview using behavioral-based questioning can significantly increase the amount of information a manager has available to determine how a potential candidate may perform in the intended job.
Mayor de Blasio: Comprehensive Homeless Services Plan Increases Focus on
HRA management structure based on the veterans move out initiative will focus on finding permanent structure based on the veterans move out initiative to promote move outs to reduce the shelter census Focus on Prevention & Rehousing Result of 90-day review includes streamlined management structure
ERIC Educational Resources Information Center
Urgelles, Jessica; Donohue, Brad; Wilks, Chelsey; Van Hasselt, Vincent B.; Azrin, Nathan H.
2012-01-01
Families served within child welfare settings evidence a wide range of emergencies or unexpected crises or circumstances that may lead to danger and make it difficult for them to focus on treatment planning. Mental health treatment providers are often unprepared to effectively manage emergencies during implementation of evidence-based prescribed…
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...
40 CFR 60.2899 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 60.2055 - What is a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
40 CFR 62.14580 - What is a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...
Wolfslehner, Bernhard; Seidl, Rupert
2010-12-01
The decision-making environment in forest management (FM) has changed drastically during the last decades. Forest management planning is facing increasing complexity due to a widening portfolio of forest goods and services, a societal demand for a rational, transparent decision process and rising uncertainties concerning future environmental conditions (e.g., climate change). Methodological responses to these challenges include an intensified use of ecosystem models to provide an enriched, quantitative information base for FM planning. Furthermore, multi-criteria methods are increasingly used to amalgamate information, preferences, expert judgments and value expressions, in support of the participatory and communicative dimensions of modern forestry. Although the potential of combining these two approaches has been demonstrated in a number of studies, methodological aspects in interfacing forest ecosystem models (FEM) and multi-criteria decision analysis (MCDA) are scarcely addressed explicitly. In this contribution we review the state of the art in FEM and MCDA in the context of FM planning and highlight some of the crucial issues when combining ecosystem and preference modeling. We discuss issues and requirements in selecting approaches suitable for supporting FM planning problems from the growing body of FEM and MCDA concepts. We furthermore identify two major challenges in a harmonized application of FEM-MCDA: (i) the design and implementation of an indicator-based analysis framework capturing ecological and social aspects and their interactions relevant for the decision process, and (ii) holistic information management that supports consistent use of different information sources, provides meta-information as well as information on uncertainties throughout the planning process.
NASA Astrophysics Data System (ADS)
Wolfslehner, Bernhard; Seidl, Rupert
2010-12-01
The decision-making environment in forest management (FM) has changed drastically during the last decades. Forest management planning is facing increasing complexity due to a widening portfolio of forest goods and services, a societal demand for a rational, transparent decision process and rising uncertainties concerning future environmental conditions (e.g., climate change). Methodological responses to these challenges include an intensified use of ecosystem models to provide an enriched, quantitative information base for FM planning. Furthermore, multi-criteria methods are increasingly used to amalgamate information, preferences, expert judgments and value expressions, in support of the participatory and communicative dimensions of modern forestry. Although the potential of combining these two approaches has been demonstrated in a number of studies, methodological aspects in interfacing forest ecosystem models (FEM) and multi-criteria decision analysis (MCDA) are scarcely addressed explicitly. In this contribution we review the state of the art in FEM and MCDA in the context of FM planning and highlight some of the crucial issues when combining ecosystem and preference modeling. We discuss issues and requirements in selecting approaches suitable for supporting FM planning problems from the growing body of FEM and MCDA concepts. We furthermore identify two major challenges in a harmonized application of FEM-MCDA: (i) the design and implementation of an indicator-based analysis framework capturing ecological and social aspects and their interactions relevant for the decision process, and (ii) holistic information management that supports consistent use of different information sources, provides meta-information as well as information on uncertainties throughout the planning process.
Beyond cost: 'responsible purchasing' of managed care by employers.
Lo Sasso, A T; Perloff, L; Schield, J; Murphy, J J; Mortimer, J D; Budetti, P P
1999-01-01
We explore the extent of "responsible purchasing" by employers--the degree to which employers collect and use nonfinancial information in selecting and managing employee health plans. Most firms believe that they have some responsibility for assessing the quality of the health plans they offer. Some pay attention to plan characteristics such as the ability to provide adequate access to providers and services and scores on enrollee satisfaction surveys. A more limited but still notable number of firms take specific actions based on responsible purchasing information. Because of countervailing pressures, however, it is not clear whether or not the firms most involved in responsible purchasing are signaling a developing trend.
NASA Astrophysics Data System (ADS)
Zhang, D.; Zhang, W. Y.
2017-08-01
Evacuation planning is an important activity in disaster management. It has to be planned in advance due to the unpredictable occurrence of disasters. It is necessary that the evacuation plans are as close as possible to the real evacuation work. However, the evacuation plan is extremely challenging because of the inherent uncertainty of the required information. There is a kind of vehicle routing problem based on the public traffic evacuation. In this paper, the demand for each evacuation set point is a fuzzy number, and each routing selection of the point is based on the fuzzy credibility preference index. This paper proposes an approximate optimal solution for this problem by the genetic algorithm based on the fuzzy reliability theory. Finally, the algorithm is applied to an optimization model, and the experiment result shows that the algorithm is effective.
On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process
NASA Astrophysics Data System (ADS)
Hongzhi, Zhao; Jian, Zhang
2018-03-01
The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.
Roy, Kakoli; Chen, Zhuo Adam; Crawford, Carol A Gotway
2009-11-01
An organization's workforce--or human capital--is its most valuable asset. The 2002 President's Management Agenda emphasizes the importance of strategic human capital management by requiring all federal agencies to improve performance by enhancing personnel and compensation systems. In response to these directives, the Centers for Disease Control and Prevention (CDC) drafted its strategic human capital management plan to ensure that it is aligned strategically to support the agency's mission and its health protection goals. In this article, we explore the personnel economics literature to draw lessons from research studies that can help CDC enhance its human capital management and planning. To do so, we focus on topics that are of practical importance and empirical relevance to CDC's internal workforce and personnel needs with an emphasis on identifying promising research issues or methodological approaches. The personnel economics literature is rich with theoretically sound and empirically rigorous approaches for shaping an evidence-based approach to human capital management that can enhance incentives to attract, retain, and motivate a talented federal public health workforce, thereby promoting the culture of high-performance government.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-21
...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.
Selecting Statistical Procedures for Quality Control Planning Based on Risk Management.
Yago, Martín; Alcover, Silvia
2016-07-01
According to the traditional approach to statistical QC planning, the performance of QC procedures is assessed in terms of its probability of rejecting an analytical run that contains critical size errors (PEDC). Recently, the maximum expected increase in the number of unacceptable patient results reported during the presence of an undetected out-of-control error condition [Max E(NUF)], has been proposed as an alternative QC performance measure because it is more related to the current introduction of risk management concepts for QC planning in the clinical laboratory. We used a statistical model to investigate the relationship between PEDC and Max E(NUF) for simple QC procedures widely used in clinical laboratories and to construct charts relating Max E(NUF) with the capability of the analytical process that allow for QC planning based on the risk of harm to a patient due to the report of erroneous results. A QC procedure shows nearly the same Max E(NUF) value when used for controlling analytical processes with the same capability, and there is a close relationship between PEDC and Max E(NUF) for simple QC procedures; therefore, the value of PEDC can be estimated from the value of Max E(NUF) and vice versa. QC procedures selected by their high PEDC value are also characterized by a low value for Max E(NUF). The PEDC value can be used for estimating the probability of patient harm, allowing for the selection of appropriate QC procedures in QC planning based on risk management. © 2016 American Association for Clinical Chemistry.
25 CFR 163.11 - Forest management planning and sustained yield management.
Code of Federal Regulations, 2010 CFR
2010-04-01
... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...
Jerry J. Vaske; Rodney R. Zwick; Maureen P. Donnelly
1992-01-01
The Visitor Impact Management (VIM) process is designed to identify unacceptable changes occurring as a result of visitor use and to develop management strategies to keep visitor impacts within acceptable levels. All previous attempts to apply the VIM planning framework have concentrated on specific resources. This paper expands this focus to an entire state. Based on...
Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chartock, Mike; Hansen, Todd
1999-08-01
The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less
NASA Astrophysics Data System (ADS)
Rohde, M. M.; Froend, R.; Howard, J.
2016-12-01
New requirements under California's Sustainable Groundwater Management Act of 2014 (SGMA) requires local Groundwater Sustainability Agencies to identify Groundwater Dependent Ecosystems (GDEs) and consider the interests of environmental beneficial uses and users of groundwater when developing their Groundwater Sustainability Plans. Most local water agencies will be identifying and considering GDEs for the first time under SGMA, and will find this challenging due to a lack of in-house biological and ecologic expertise. Uncertainty around what management triggers and thresholds are needed to prevent harm to GDEs is not only endemic to California, but also worldwide due to a lack of science at the intersection of hydrology and ecology. Australia has, however, has done an exceptional job at reducing uncertainty when selecting management triggers and thresholds for GDEs in their water management plans. This has been achieved by integrating risk assessment into an adaptive management framework that uses monitoring programs to inform management strategies. This "learn by doing" approach has helped close knowledge gaps needed to manage GDEs in response to Australia's national sustainable water management legislation. The two main objectives of this paper are to: 1) synthesize Australia's adaptive management approach of GDEs in state water plans, and 2) highlight opportunities for knowledge transfer from Australia into the California context.
The recreation opportunity spectrum: a framework for planning, management, and research.
Roger N. Clark; George H. Stankey
1979-01-01
The end product of recreation management is a diverse range of opportunities from which people can derive various experiences. This paper offers a framework for managing recreation opportunities based on six physical, biological, social, and managerial factors that, when combined, can be utilized by recreationists to obtain diverse experiences.
Planning for management information systems in drug treatment organizations.
Zalkind, D; Zelon, H; Moore, M; Kaluzny, A
1979-02-01
An attempt to set up a management information system for individual drug abuse programs throughout a state is described. The principles upon which the system is based are discussed along with the problems encountered in its implementation. A series of guidelines for establishing management information systems in operating human services agencies is included.
Adaptive monitoring design for ecosystem management
Paul L. Ringold; Jim Alegria; Raymond L. Czaplewski; Barry S. Mulder; Tim Tolle; Kelly Burnett
1996-01-01
Adaptive management of ecosystems (e.g., Holling 1978, Walters 1986, Everett et al. 1994, Grumbine 1994, Yaffee 1994, Gunderson et al. 1995, Frentz et al. 1995, Montgomery et al. 1995) structures a system in which monitoring iteratively improves the knowledge base and helps refine management plans. This adaptive approach acknowledges that action is necessary or...
Preparing the Host Country Workforce for Expatriate Managers: The Neglected Other Side of the Coin.
ERIC Educational Resources Information Center
Vance, Charles M.; Ring, Peter Smith
1994-01-01
Using an instructional systems development approach, ways to prepare the host country workforce for the assignment of an expatriate manager are discussed. The model is based on a number of perspectives: exchange theory, participatory management, corporate social responsibility, communication theory, and strategic human resource planning. (SK)
New Map Symbol System for Disaster Management
NASA Astrophysics Data System (ADS)
Marinova, Silvia T.
2018-05-01
In the last 10 years Bulgaria was frequently affected by natural and man-made disasters that caused considerable losses. According to the Bulgarian Disaster Management Act (2006) disaster management should be planned at local, regional and national level. Disaster protection is based on plans that include maps such as hazard maps, maps for protection, maps for evacuation planning, etc. Decision-making and cooperation between two or more neighboring municipalities or regions in crisis situation are still rendered difficult because the maps included in the plans differ in scale, colors, map symbols and cartographic design. To improve decision-making process in case of emergency and to reduce the number of human loss and property damages disaster management plans at local and regional level should be supported by detailed thematic maps created in accordance with uniform contents, map symbol system and design. The paper proposes a new symbol system for disaster management that includes a four level hierarchical classification of objects and phenomena according to their type and origin. All objects and phenomena of this classification are divided into five categories: disasters; infrastructure; protection services and infrastructure for protection; affected people and affected infrastructure; operational sites and activities. The symbols of these categories are shown with different background colors and shapes so that they are identifiable. All the symbols have simple but associative design. The new symbol system is used in the design of a series of maps for disaster management at local and regional level.
Better management of Irish hospitals.
Brugha, C M
1991-08-01
The establishment of the Dublin Hospitals Initiative and the Efficiency Review Group as first steps in an "action" plan was based on the report in 1989 of the Commission of Health Funding which suggested that "the solution to the problem facing the Irish health services...(lies) primarily...in the way that services are planned, organised and delivered". Our health service is in transition from the phase of facility management into that of functional management. This will involve facing the fact of the limit on resources, introducing information systems and getting the co-operation of hospital doctors. The most senior executive in a hospital must firstly be a good general manager with sufficient power to manage. Hospitals should be divided into centres of responsibility made up of one or more centres of activity. Formal education for hospital administrators should be extended. There is a need for training at all levels, particularly of those administrative and medical staff who have direct interaction with the computer-based system. There should be a commitment to management development particularly by means of teamwork and action learning.
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Must I prepare a waste management plan... December 1, 2008 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
40 CFR 62.14430 - Must I prepare a waste management plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...
25 CFR 163.11 - Forest management planning and sustained yield management.
Code of Federal Regulations, 2011 CFR
2011-04-01
... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and... 25 Indians 1 2011-04-01 2011-04-01 false Forest management planning and sustained yield management... management planning for Indian forest land shall be carried out through participation in the development and...
NASA Astrophysics Data System (ADS)
Saadé-Sbeih, Myriam; Zwahlen, François; Haj Asaad, Ahmed; Gonzalez, Raoul; Jaubert, Ronald
2016-10-01
Water management is a fundamental issue in post-conflict planning in Syria. Based on historical water balance assessment, this study identifies the drivers of the profound changes that took place in the Lebanese and Syrian parts of the Orontes River basin since the 1930s. Both drastic effects of the conflict on the hydro-system and the strong uncontrolled anthropization of the river basin prior to the crisis have to be considered in the design of recovery interventions.
ERIC Educational Resources Information Center
Brown, Joseph
2006-01-01
In this article, the author discusses a literature-based character education program at the school district of Hillsborough County in Florida. The district recently developed a comprehensive management plan in response to the much-publicized school violence of recent years. The plan addresses school issues including tornado and fire drills,…
Optimizing Global Force Management for Special Operations Forces
2016-12-01
5323 10. SPONSORING / MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of the author and do not...plans and apportions forces to combatant commands based on SecDef’s contingency planning guidance (GFM Division 2016) (Figure 1). 3 The image