40 CFR 130.9 - Designation and de-designation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...; (iv) Open space and recreation; (v) Energy use and conservation; (vi) Floodplain and wetlands...
Design and realization of high quality prime farmland planning and management information system
NASA Astrophysics Data System (ADS)
Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin
2007-06-01
The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Eligible planning, urban... ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...
76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-01
... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...
Aviation Human-in-the-Loop Simulation Studies: Experimental Planning, Design, and Data Management
2014-01-01
Aviation Human-in-the-Loop Simulation Studies: Experimental Planning, Design , and Data Management Kevin W. Williams1 Bonny Christopher2 Gena...Simulation Studies: Experimental Planning, Design , and Data Management January 2014 6. Performing Organization Code 7. Author(s) 8. Performing...describe the process by which we designed our human-in-the-loop (HITL) simulation study and the methodology used to collect and analyze the results
Solid Waste Management Planning--A Methodology
ERIC Educational Resources Information Center
Theisen, Hilary M.; And Others
1975-01-01
This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)
Integrating fire management analysis into land management planning
Thomas J. Mills
1983-01-01
The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
ERIC Educational Resources Information Center
Moore, Robin C., Ed.; Goltsman, Susan M., Ed.; Iacofano, Daniel S., Ed.
These guidelines assist professional designers, park and recreation managers, and community groups when making decisions about the planning, design, and ongoing management of children's public play environments. The guidelines are updated to meet or exceed the requirements of the Americans with Disabilities Act Guidelines (July 26, 1991) and the…
Management Information System Based on the Balanced Scorecard
ERIC Educational Resources Information Center
Kettunen, Juha; Kantola, Ismo
2005-01-01
Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…
Planning, Designing and Managing Higher Education Institutions
ERIC Educational Resources Information Center
Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig
2005-01-01
The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…
Urban Planning and Management Information Systems Analysis and Design Based on GIS
NASA Astrophysics Data System (ADS)
Xin, Wang
Based on the analysis of existing relevant systems on the basis of inadequate, after a detailed investigation and research, urban planning and management information system will be designed for three-tier structure system, under the LAN using C/S mode architecture. Related functions for the system designed in accordance with the requirements of the architecture design of the functional relationships between the modules. Analysis of the relevant interface and design, data storage solutions proposed. The design for small and medium urban planning information system provides a viable building program.
75 FR 76345 - Risk Reduction Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Management Plan Each RRPP must include a Fatigue Management Plan (FMP) that will be designed to reduce the... organizations to develop voluntary proactive safety programs designed to improve railroad safety and build... contractors. A railroad's RRPP may be required to specify how the railroad will periodically review the design...
Efficiency improvement of technological preparation of power equipment manufacturing
NASA Astrophysics Data System (ADS)
Milukov, I. A.; Rogalev, A. N.; Sokolov, V. P.; Shevchenko, I. V.
2017-11-01
Competitiveness of power equipment primarily depends on speeding-up the development and mastering of new equipment samples and technologies, enhancement of organisation and management of design, manufacturing and operation. Actual political, technological and economic conditions cause the acute need in changing the strategy and tactics of process planning. At that the issues of maintenance of equipment with simultaneous improvement of its efficiency and compatibility to domestically produced components are considering. In order to solve these problems, using the systems of computer-aided process planning for process design at all stages of power equipment life cycle is economically viable. Computer-aided process planning is developed for the purpose of improvement of process planning by using mathematical methods and optimisation of design and management processes on the basis of CALS technologies, which allows for simultaneous process design, process planning organisation and management based on mathematical and physical modelling of interrelated design objects and production system. An integration of computer-aided systems providing the interaction of informative and material processes at all stages of product life cycle is proposed as effective solution to the challenges in new equipment design and process planning.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-14
... Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency..., Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S... Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental...
DOT National Transportation Integrated Search
1988-09-01
THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
Two for one: a self-management plan coupled with a prescription sheet for children with asthma.
Ducharme, Francine M; Noya, Francisco; McGillivray, David; Resendes, Sandy; Ducharme-Bénard, Stéphanie; Zemek, Roger; Bhogal, Sanjit Kaur; Rouleau, Rachel
2008-10-01
Despite strong recommendations in the asthma guidelines, the use of written self-management plans remains low among asthmatic patients. To develop a written self-management plan, based on scientific evidence and expert opinions, in a format intended to facilitate its dispensing by health care professionals, and to test the perception of its relevance and clarity by asthmatic children, adolescents and adults. Inspired by previously tested self-management plans, surveys of asthma educators, expert opinions and the 2004 Canadian Asthma Guidelines, the authors simultaneously developed French and English versions of a written self-management plan that coupled with a prescription. The self-management plan was tested in parents and their asthmatic children (aged one to 17 years), and it was revised until 85% clarity and perceived relevance was achieved. Ninety-seven children and their parents were interviewed. Twenty per cent had a self-management plan. On the final revision, nearly all items were clear and perceived relevant by 85% or more of the interviewees. Two self-management plans were designed for clinics and acute care settings, respectively. The plans are divided into three control zones identified by symptoms with optional peak flow values and symbolized by traffic light colours. They are designed in triplicate format with a prescription slip, a medical chart copy and a patient copy. The written self-management plans, based on available scientific evidence and expert opinions, are clear and perceived to be relevant by children, adolescents and their parents. By incorporating the prescription and chart copies, they were designed to facilitate dispensing by physicians in both clinics and acute care settings.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... DEPARTMENT OF THE INTERIOR National Park Service General Management Plan; Joshua Tree National... National Park Service is updating the General Management Plan (GMP) for Joshua Tree National Park... park management and resource analysis, other designations such as establishment of 594,502 acres by...
NYC CV Pilot Deployment : Safety Management Plan : New York City.
DOT National Transportation Integrated Search
2016-04-22
This safety management plan identifies preliminary safety hazards associated with the New York City Connected Vehicle Pilot Deployment project. Each of the hazards is rated, and a plan for managing the risks through detailed design and deployment is ...
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.; Brandt, C.; Calfee, J.
1994-03-01
The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less
Simulating traffic for incident management and ITS investment decisions
DOT National Transportation Integrated Search
1998-08-01
UTPS-type models were designed to adequately support planning activities typical of the 1960s and 1970s. However, these packages were not designed to model intelligent transportation systems (ITS) and support incident management planning. To ov...
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
Renovating Interior Office Space: What a Manager Needs To Consider.
ERIC Educational Resources Information Center
Babey, Evelyn R.
When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…
Theory and Practice Meets in Industrial Process Design -Educational Perspective-
NASA Astrophysics Data System (ADS)
Aramo-Immonen, Heli; Toikka, Tarja
Software engineer should see himself as a business process designer in enterprise resource planning system (ERP) re-engineering project. Software engineers and managers should have design dialogue. The objective of this paper is to discuss the motives to study the design research in connection of management education in order to envision and understand the soft human issues in the management context. Second goal is to develop means of practicing social skills between designers and managers. This article explores the affective components of design thinking in industrial management domain. In the conceptual part of this paper are discussed concepts of network and project economy, creativity, communication, use of metaphors, and design thinking. Finally is introduced empirical research plan and first empirical results from design method experiments among the multi-disciplined groups of the master-level students of industrial engineering and management and software engineering.
ERIC Educational Resources Information Center
Salazar, LeRoy; And Others
This resource for trainers involved in irrigated agriculture training for Peace Corps volunteers consists of two parts: irrigation training manual and irrigation reference manual. The complete course should fully prepare volunteers serving as irrigation, specialists to plan, implement, evaluate and manage small-scale irrigation projects in arid,…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-03
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Resource Management Plan/General Plan Draft... Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2012 CFR
2012-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2013 CFR
2013-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
5 CFR 412.202 - Systematic training and development of supervisors, managers, and executives.
Code of Federal Regulations, 2014 CFR
2014-01-01
... MANAGEMENT CIVIL SERVICE REGULATIONS SUPERVISORY, MANAGEMENT, AND EXECUTIVE DEVELOPMENT Succession Planning... the agencies' succession plans. Agencies also must issue written policies to ensure they: (a) Design...
Planning in context: A situated view of children's management of science projects
NASA Astrophysics Data System (ADS)
Marshall, Susan Katharine
This study investigated children's collaborative planning of a complex, long-term software design project. Using sociocultural methods, it examined over time the development of design teams' planning negotiations and tools to document the coconstruction of cultural frameworks to organize teams' shared understanding of what and how to plan. Results indicated that student teams developed frameworks to address a set of common planning functions that included design planning, project metaplanning (things such as division of labor or sharing of computer resources) and team collaboration management planning. There were also some between-team variations in planning frameworks, within a bandwidth of options. Teams engaged in opportunistic planning, which reflected shifts in strategies in response to new circumstances over time. Team members with past design project experience ("oldtimers") demonstrated the transfer of their planning framework to the current design task, and they supported the developing participation of "newcomers." Teams constructed physical tools (e.g. planning boards) that acted as visual representations of teams' planning frameworks, and inscriptions of team thinking. The assigned functions of the tools also shifted over time with changing project circumstances. The discussion reexamines current approaches to the study of planning and discusses their educational implications.
77 FR 21161 - National Forest System Land Management Planning
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-09
... ecosystem services and multiple uses. The planning rule is designed to ensure that plans provide for the... adaptive and science-based, engages the public, and is designed to be efficient, effective, and within the..., the new rule is designed to make planning more efficient and effective. Purpose and Need for the New...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2010 CFR
2010-07-01
... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Interior planning and...
Guidelines for developing transportation management plans in Virginia.
DOT National Transportation Integrated Search
2005-01-01
A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2013 CFR
2013-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2012 CFR
2012-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2011 CFR
2011-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
41 CFR 101-26.506 - Interior planning and design services.
Code of Federal Regulations, 2014 CFR
2014-07-01
... design services. 101-26.506 Section 101-26.506 Public Contracts and Property Management Federal Property... SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.506 Interior planning and design services. In... various phases of interior planning and design. These services will be provided either directly or through...
Planning and design of a knowledge based system for green manufacturing management
NASA Astrophysics Data System (ADS)
Kamal Mohd Nawawi, Mohd; Mohd Zuki Nik Mohamed, Nik; Shariff Adli Aminuddin, Adam
2013-12-01
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization.
Code of Federal Regulations, 2010 CFR
2010-07-01
... quality management plans. (1) In order to be approved the POTW Pretreatment Program shall be consistent with any approved water quality management plan developed in accordance with 40 CFR parts 130, 131, as revised, where such 208 plan includes Management Agency designations and addresses pretreatment in a...
75 FR 22047 - Intent To Initiate Consultation and Coordinate the National Oceanic and Atmospheric...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-27
... purposes and policies of the NMSA (73 FR 53161). The management plan review process occurs concurrently... management plan was written as part of the sanctuary designation process and published in the Final... Environmental Impact Statement under the authority of NEPA (73 FR 53161). The management plan review process is...
Place and place-based planning.
Linda E. Kruger; Daniel R. Williams
2007-01-01
Place-related concepts are factors in public involvement, conflict, recreation management, recreation displacement, landscape planning and design. This has captured the attention of researchers and managers. We posit that planning and management of public lands requires an understanding of what it is about the lands that people value and care about. In this paper we...
The United Kingdom's School Asset Management Plans.
ERIC Educational Resources Information Center
Jones, Alan
1999-01-01
Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…
41 CFR 102-76.15 - What are design and construction services?
Code of Federal Regulations, 2010 CFR
2010-07-01
... construction services are— (a) Site planning and landscape design; (b) Architectural and interior design; and... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are design and... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN AND...
Code of Federal Regulations, 2012 CFR
2012-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... whether a modification is minor include the value and size of the modification and the comparative value...
Code of Federal Regulations, 2010 CFR
2010-07-01
... utilize an interdisciplinary team with leadership by planning, and participation from engineering, design.... Subsequent aspects of planning, development, and management for the specific project will be directed to... management plans for each specific water resource project, including at least one public meeting. The...
RANGE RAM: a long-term planning method for managing grazing lands
Henricus C. Jansen
1976-01-01
Range RAM (Resource Allocation Method) is a computerized planning method designed to assist range managers in developing and selecting alternatives in spatial and temporal allocation of resources. The technique is applicable at the frest or district management levels, or their equivalents. Range RAM can help formulate plans that maximize the production of range outputs...
ERIC Educational Resources Information Center
New York State Education Dept., Albany. Div. of Elementary and Secondary Education Planning.
Designed to provide assistance to school district personnel who seek to develop a plan for information management and related applications of technology, this guide presents the School District Information Study (SDIS) model for the review of management policies, procedures, and activities related to information processing done by school district…
ERIC Educational Resources Information Center
Blaschke, Charles L.; Steiger, JoAnn
This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
Code of Federal Regulations, 2013 CFR
2013-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...
Code of Federal Regulations, 2014 CFR
2014-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...
Strategic planning for health care management information systems.
Rosenberger, H R; Kaiser, K M
1985-01-01
Using a planning methodology and a structured design technique for analyzing data and data flow, information requirements can be derived to produce a strategic plan for a management information system. Such a long-range plan classifies information groups and assigns them priorities according to the goals of the organization. The approach emphasizes user involvement.
The Marketing Plan: An Integrative Device for Teaching Marketing Management.
ERIC Educational Resources Information Center
Berdine, W. R.; Petersen, James C.
1980-01-01
The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...
Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.
West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra
2017-01-01
The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.
40 CFR 255.11 - Criteria for identifying agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... quality management planning agencies designated under section 208 of the Federal Water Pollution Control... State water quality management agencies. (d) Planning objectives will influence agency selection... IDENTIFICATION OF REGIONS AND AGENCIES FOR SOLID WASTE MANAGEMENT Criteria for Identifying Regions and Agencies...
40 CFR 130.9 - Designation and de-designation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Designation and de-designation. 130.9... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... approval in accordance with section 208(a)(7) of the Act. (b) De-designation. The Governor may modify or...
Atkinson, A.J.; Trenham, P.C.; Fisher, R.N.; Hathaway, S.A.; Johnson, B.S.; Torres, S.G.; Moore, Y.C.
2004-01-01
critical management uncertainties; and 3) implementing long-term monitoring and adaptive management. Ultimately, the success of regional conservation planning depends on the ability of monitoring programs to confront the challenges of adaptively managing and monitoring complex ecosystems and diverse arrays of sensitive species.
New Map Symbol System for Disaster Management
NASA Astrophysics Data System (ADS)
Marinova, Silvia T.
2018-05-01
In the last 10 years Bulgaria was frequently affected by natural and man-made disasters that caused considerable losses. According to the Bulgarian Disaster Management Act (2006) disaster management should be planned at local, regional and national level. Disaster protection is based on plans that include maps such as hazard maps, maps for protection, maps for evacuation planning, etc. Decision-making and cooperation between two or more neighboring municipalities or regions in crisis situation are still rendered difficult because the maps included in the plans differ in scale, colors, map symbols and cartographic design. To improve decision-making process in case of emergency and to reduce the number of human loss and property damages disaster management plans at local and regional level should be supported by detailed thematic maps created in accordance with uniform contents, map symbol system and design. The paper proposes a new symbol system for disaster management that includes a four level hierarchical classification of objects and phenomena according to their type and origin. All objects and phenomena of this classification are divided into five categories: disasters; infrastructure; protection services and infrastructure for protection; affected people and affected infrastructure; operational sites and activities. The symbols of these categories are shown with different background colors and shapes so that they are identifiable. All the symbols have simple but associative design. The new symbol system is used in the design of a series of maps for disaster management at local and regional level.
45 CFR 205.36 - State plan requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... account for— (1) All the factors in the total eligibility determination process under the plan for aid...
Code of Federal Regulations, 2012 CFR
2012-01-01
... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...
Code of Federal Regulations, 2013 CFR
2013-01-01
... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...
Code of Federal Regulations, 2014 CFR
2014-01-01
... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
15 CFR 921.31 - Supplemental acquisition and development awards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AND COASTAL RESOURCE MANAGEMENT NATIONAL ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Reserve... Estuarine Research Reserve designation, and as specified in the approved management plan, a coastal state... interests identified in the management plan as necessary to strengthen protection of key land and water...
Design and analysis of advanced flight planning concepts
NASA Technical Reports Server (NTRS)
Sorensen, John A.
1987-01-01
The objectives of this continuing effort are to develop and evaluate new algorithms and advanced concepts for flight management and flight planning. This includes the minimization of fuel or direct operating costs, the integration of the airborne flight management and ground-based flight planning processes, and the enhancement of future traffic management systems design. Flight management (FMS) concepts are for on-board profile computation and steering of transport aircraft in the vertical plane between a city pair and along a given horizontal path. Flight planning (FPS) concepts are for the pre-flight ground based computation of the three-dimensional reference trajectory that connects the city pair and specifies the horizontal path, fuel load, and weather profiles for initializing the FMS. As part of these objectives, a new computer program called EFPLAN has been developed and utilized to study advanced flight planning concepts. EFPLAN represents an experimental version of an FPS. It has been developed to generate reference flight plans compatible as input to an FMS and to provide various options for flight planning research. This report describes EFPLAN and the associated research conducted in its development.
Space Station thermal management system development status and plans
NASA Technical Reports Server (NTRS)
Rankin, J. G.
1985-01-01
The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.
Sample transportation management plans and templates.
DOT National Transportation Integrated Search
2010-08-01
This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...
7 CFR 634.13 - Project applications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... State or areawide 208 water quality management plan. (c) Applications shall contain the following... water-quality management agency designated by the Governor to carry out the approved agricultural portion of the 208 water quality management plan for the area or source certifying that the BMPs to be...
7 CFR 634.13 - Project applications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... State or areawide 208 water quality management plan. (c) Applications shall contain the following... water-quality management agency designated by the Governor to carry out the approved agricultural portion of the 208 water quality management plan for the area or source certifying that the BMPs to be...
Choudhry, Niteesh K; Fischer, Michael A; Smith, Benjamin F; Brill, Gregory; Girdish, Charmaine; Matlin, Olga S; Brennan, Troyen A; Avorn, Jerry; Shrank, William H
2014-03-01
Value-based insurance design (VBID) plans selectively lower cost sharing to increase medication adherence. Existing plans have been structured in a variety of ways, and these variations could influence the effectiveness of VBID plans. We evaluated seventy-six plans introduced by a large pharmacy benefit manager during 2007-10. We found that after we adjusted for the other features and baseline trends, VBID plans that were more generous, targeted high-risk patients, offered wellness programs, did not offer disease management programs, and made the benefit available only for medication ordered by mail had a significantly greater impact on adherence than plans without these features. The effects were as large as 4-5 percentage points. These findings can provide guidance for the structure of future VBID plans.
DOT National Transportation Integrated Search
1995-12-01
Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...
Yolasığmaz, Hacı Ahmet; Keleş, Sedat
2009-01-01
In Turkey, the understanding of planning focused on timber production has given its place on Multiple Use Management (MUM). Because the whole infrastructure of forestry with inventory system leading the way depends on timber production, some cases of bottle neck are expected during the transition period. Database design, probably the most important stage during the transition to MUM, together with the digital basic maps making up the basis of this infrastructure constitute the main point of this article. Firstly, the forest management philosophy of Turkey in the past was shortly touched upon in the article. Ecosystem Based Multiple Use Forest Management (EBMUFM) approaches was briefly introduced. The second stage of the process of EBMUFM, database design was described by examining the classical planning infrastructure and the coverage to be produced and consumed were suggested in the form of lists. At the application stage, two different geographical databases were established with GIS in Balcı Planning Unit of the years 1984 and 2006. Following that the related basic maps are produced. Timely diversity of the planning unit of 20 years is put forward comparatively with regard to the stand parameters such as tree types, age class, development stage, canopy closure, mixture, volume and increment.
DOT National Transportation Integrated Search
2017-12-01
In designing an effective traffic management plan for non-recurrent congestion, it is critical for responsible highway agencies to have some vital information, such as estimated incident duration, resulting traffic queues, and the expected delays. Ov...
Congestion management system/IVHS program study Birmingham, Alabama : phase 1, report
DOT National Transportation Integrated Search
1995-04-01
The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...
Congestion Management System/IVHS Program Study for Birmingham, Alabama. Phase 1 Report
DOT National Transportation Integrated Search
1995-04-01
The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...
ERIC Educational Resources Information Center
McCabe, Gerard B.
This book on public library design and construction contains the following chapters: (1) "Beginning the Plan"; (2) "Data for Planning"; (3) "Location: Finding a Site"; (4) "Interior Design"; (5) "Furnishing and Equipping the Library and Its Environs"; (6) "Other Views," including "Using Small College Library Planning Techniques in Public Library…
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Water Management Plan for Fort Buchanan, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine
2004-06-01
This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...
Appendix X. ComField Information Management System.
ERIC Educational Resources Information Center
Coffin, Robert W.
This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…
NASA Astrophysics Data System (ADS)
Bereskie, Ty; Rodriguez, Manuel J.; Sadiq, Rehan
2017-08-01
Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.
Bereskie, Ty; Rodriguez, Manuel J; Sadiq, Rehan
2017-08-01
Drinking water management in Canada is complex, with a decentralized, three-tiered governance structure responsible for safe drinking water throughout the country. The current approach has been described as fragmented, leading to governance gaps, duplication of efforts, and an absence of accountability and enforcement. Although there have been no major waterborne disease outbreaks in Canada since 2001, a lack of performance improvement, especially in small drinking water systems, is evident. The World Health Organization water safety plan approach for drinking water management represents an alternative preventative management framework to the current conventional, reactive drinking water management strategies. This approach has seen successful implementation throughout the world and has the potential to address many of the issues with drinking water management in Canada. This paper presents a review and strengths-weaknesses-opportunities-threats analysis of drinking water management and governance in Canada at the federal, provincial/territorial, and municipal levels. Based on this analysis, a modified water safety plan (defined as the plan-do-check-act (PDCA)-WSP framework) is proposed, established from water safety plan recommendations and the principles of PDCA for continuous performance improvement. This proposed framework is designed to strengthen current drinking water management in Canada and is designed to fit within and incorporate the existing governance structure.
Vehicle management and mission planning systems with shuttle applications
NASA Technical Reports Server (NTRS)
1972-01-01
A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
Towards Knowledge Management for Smart Manufacturing.
Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard
2017-09-01
The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.
ERIC Educational Resources Information Center
Peace Corps, Washington, DC. Information Collection and Exchange Div.
A french language version of a training manual that presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first…
ERIC Educational Resources Information Center
Virginia Polytechnic Inst. and State Univ., Blacksburg. Div. of Vocational-Technical Education.
This self-instructional module on developing your sales promotion plan is the fifth in a set of twelve modules designed for small business owner-managers. Competencies for this module are (1) describe the role of advertising, display, and personal selling in a sales promotion plan and (2) develop an effective sales promotion plan which…
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
48 CFR 36.601-4 - Implementation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...
Factors affecting strategic plan implementation using interpretive structural modeling (ISM).
Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba
2018-06-11
Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.
43 CFR 37.11 - Nomination, evaluation, and designation of significant caves.
Code of Federal Regulations, 2010 CFR
2010-10-01
... organizations interested in the management and use of cave resources, within the limits imposed by the... caves are afforded protection and will be managed in compliance with approved resource management plans... in part due to cave resources found therein, all caves within the so-designated special management...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Strategic survey framework for the Northwest Forest Plan survey and manage program.
Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler
2003-01-01
This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-18
... Conservation Area (NCA), addressed in the September 2008 Resource Management Plan (RMP) and Record of Decision... an array of management actions designed to conserve natural and cultural resources on BLM... cultural resources within the NCA as described in the NCA Management Plan; to allow for safe public...
Conceptual design of an in-space cryogenic fluid management facility, executive summary
NASA Technical Reports Server (NTRS)
Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.
1981-01-01
The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is summarized. The preliminary facility definition, conceptual design and design analysis, and facility development plan, including schedule and cost estimates for the facility, are presented.
SDO Delta H Mode Design and Analysis
NASA Technical Reports Server (NTRS)
Mason, Paul A.; Starin, Scott R.
2007-01-01
While on orbit, disturbance torques on a three axis stabilized spacecraft tend to increase the system momentum, which is stored in the reaction wheels. Upon reaching the predefined momentum capacity (or maximum wheel speed) of the reaction wheel, an external torque must be used to unload the momentum. The purpose of the Delta H mode is to manage the system momentum. This is accomplished by driving the reaction wheels to a target momentum state while the attitude thrusters, which provide an external torque, are used to maintain the attitude. The Delta H mode is designed to meet the mission requirements and implement the momentum management plan. Changes in the requirements or the momentum management plan can lead to design changes in the mode. The momentum management plan defines the expected momentum buildup trend, the desired momentum state and how often the system is driven to the desired momentum state (unloaded). The desired momentum state is chosen based on wheel capacity, wheel configuration, thruster layout and thruster sizing. For the Solar Dynamics Observatory mission, the predefined wheel momentum capacity is a function of the jitter requirements, power, and maximum momentum capacity. Changes in jitter requirements or power limits can lead to changes in the desired momentum state. These changes propagate into the changes in the momentum management plan and therefore the Delta H mode design. This paper presents the analysis and design performed for the Solar Dynamics Observatory Delta H mode. In particular, the mode logic and processing needed to meet requirements is described along with the momentum distribution formulation. The Delta H mode design is validated using the Solar Dynamics Observatory High Fidelity simulator. Finally, a summary of the design is provided along with concluding remarks.
NASA Astrophysics Data System (ADS)
Azarov, A. V.; Zhukova, N. S.; Kozlovtseva, E. Yu; Dobrinsky, D. R.
2018-05-01
The article considers obtaining mathematical models to assess the efficiency of the dust collectors using an integrated system of analysis and data management STATISTICA Design of Experiments. The procedure for obtaining mathematical models and data processing is considered by the example of laboratory studies on a mounted installation containing a dust collector in counter-swirling flows (CSF) using gypsum dust of various fractions. Planning of experimental studies has been carried out in order to reduce the number of experiments and reduce the cost of experimental research. A second-order non-position plan (Box-Bencken plan) was used, which reduced the number of trials from 81 to 27. The order of statistical data research of Box-Benken plan using standard tools of integrated system for analysis and data management STATISTICA Design of Experiments is considered. Results of statistical data processing with significance estimation of coefficients and adequacy of mathematical models are presented.
75 FR 66780 - Suisun Marsh Habitat Management, Preservation, and Restoration Plan, California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the... comprehensive 30-year plan designed to address various conflicts regarding use of resources within approximately... comprehensive plan designed to address the various conflicts regarding use of Marsh resources, with the focus on...
Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parr, P.D.; Evans, J.W.
1992-06-01
A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burgard, K.G.
This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less
26 CFR 54.9812-1 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) Formulary design for prescription drugs; (C) For plans with multiple network tiers (such as preferred providers and participating providers), network tier design; (D) Standards for provider admission to.... (i) Facts. A plan considers a wide array of factors in designing medical management techniques for...
75 FR 391 - Statement of Organization, Functions and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-05
... cards; (4) provides planning, management and oversight of all interior design projects, move services... in all equal employment opportunity (EEO) areas; (2) administers affirmative action programs designed... problems in terms of financial management information; (6) analyzes the design, implementation, enhancement...
43 CFR 1610.7 - Designation of areas.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Designation of areas. 1610.7 Section 1610.7 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management...
Mittler, Jessica N.; Landon, Bruce E.; Zaslavsky, Alan M.; Cleary, Paul D.
2011-01-01
Background Medicare beneficiaries' awareness of Medicare managed care plans is critical for realizing the potential benefits of coverage choices. Objectives To assess the relationships of the number of Medicare risk plans, managed care penetration, and stability of plans in an area with traditional Medicare beneficiaries' awareness of the program. Research Design Cross-sectional analysis of Medicare Current Beneficiary Survey data about beneficiaries' awareness and knowledge of Medicare managed care plan availability. Logistic regression models used to assess the relationships between awareness and market characteristics. Subjects Traditional Medicare beneficiaries (n = 3,597) who had never been enrolled in Medicare managed care, but had at least one plan available in their area in 2002, and excluding beneficiaries under 65, receiving Medicaid, or with end stage renal disease. Measures Traditional Medicare beneficiaries' knowledge of Medicare managed care plans in general and in their area. Results Having more Medicare risk plans available was significantly associated with greater awareness, and having an intermediate number of plans (2-4) was significantly associated with more accurate knowledge of Medicare risk plan availability than was having fewer or more plans. Conclusions Medicare may have more success engaging consumers in choice and capturing the benefits of plan competition by more actively selecting and managing the plan choice set. PMID:22340776
Huang, Chunkai; Zeng, Ping; Yang, Sen; Shao, Yanxi; Liu, Yang
2016-10-01
A review of the literature published in 2015 on topics relating to water reclamation and reuse is presented. The review is divided into the following sections: (1) General: extent of reuse, research needs, guidelines and monitoring, health effects; (2) Treatment technologies: integrated process design, membrane treatment, membrane bioreactors, electrocoagulation, ion exchange and adsorption, disinfection, wetlands, managed aquifer recharge; (3) Planning and management: public acceptance and education, economics/pricing, water quality planning and management and project/case studies. Much of the water treatment research focuses on membrane treatment, integrated designs, and other innovative technologies.
45 CFR 205.36 - State plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., of an automated statewide management information system designed effectively and efficiently, to assist management in the administration of an approved AFDC State plan. The submission process to amend... aid or services is changed. (c) To electronically refer and exchange information with programs under...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
.... This proposed amendment to the 2006 Land Management Plans is limited in scope and designed to address... Agency (including the Departments of Fish and Game, Parks and Recreation, and Forestry and Fire [[Page...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... Wilderness in Red Rock Canyon National Conservation Area, Clark County, NV AGENCY: Bureau of Land Management... designated as wilderness and are no longer WSAs governed by the IMP. The planning area is located in Clark...
VDOT manual of practice for planning stormwater management.
DOT National Transportation Integrated Search
1992-01-01
The final report is in the form of a manual of practice for the VDOT to use in planning its stormwater management strategies. The manual was proposed to aid in the selection and design of erosion control practices and stormwater control practices for...
48 CFR 1318.270 - Emergency acquisition flexibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Procurement Executive. (b) Continuity of Operations Plan. Each Contracting Activity shall have an updated Continuity of Operations Plan, in place designating emergency personnel with warrant levels. (c) Management... appropriate management controls are established and maintained to support the use of the increased thresholds...
Recreation Carrying Capacity Handbook Methods and Techniques for Planning, Design, and Management.
1980-07-01
0 CU U ___ Imp W B’ m Type of Wildlife 1’ 0 -0 0 a 0 0 0 Type of Vegetation 0 0 0 0 1 0 1 1 00 rAmount of Tree Cover/Shade of 0 l 0 010 is Is Type...Thorough identification and clarifi- Emphasize controlling vehicle Identifying And Clarifying cation of management objectives re- use rather than... identification and clarifi- planners and resource managers cation of management objectives per- early in the master planning process Plan so the capacity
Adaptive management of forest ecosystems: did some rubber hit the road?
B.T. Bormann; R.W. Haynes; J.R. Martin
2007-01-01
Although many scientists recommend adaptive management for large forest tracts, there is little evidence that its use has been effective at this scale. One exception is the 10-million-hectare Northwest Forest Plan, which explicitly included adaptive management in its design. Evidence from 10 years of implementing the plan suggests that formalizing adaptive steps and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
... Conservation Area (NCA), addressed in the September 2008 Resource Management Plan (RMP) and Record of Decision... an array of management actions designed to conserve natural and cultural resources on BLM... analysis can be found in Chapter 4 of the Proposed Resource Management Plan and Final Environmental Impact...
Shanmugasundaram, Jothiganesh; Soulalay, Vongdeuane; Chettiyappan, Visvanathan
2012-06-01
In Lao People's Democratic Republic (Lao PDR), a growth of healthcare centres, and the environmental hazards and public health risks typically accompanying them, increased the need for healthcare waste (HCW) management planning. An effective planning of an HCW management system including components such as the treatment plant siting and an optimized routeing system for collection and transportation of waste is deemed important. National government offices at developing countries often lack the proper tools and methodologies because of the high costs usually associated with them. However, this study attempts to demonstrate the use of an inexpensive GIS modelling tool for healthcare waste management in the country. Two areas were designed for this study on HCW management, including: (a) locating centralized treatment plants and designing optimum travel routes for waste collection from nearby healthcare facilities; and (b) utilizing existing hospital incinerators and designing optimum routes for collecting waste from nearby healthcare facilities. Spatial analysis paved the way to understand the spatial distribution of healthcare wastes and to identify hotspots of higher waste generating locations. Optimal route models were designed for collecting and transporting HCW to treatment plants, which also highlights constraints in collecting and transporting waste for treatment and disposal. The proposed model can be used as a decision support tool for the efficient management of hospital wastes by government healthcare waste management authorities and hospitals.
NASA Astrophysics Data System (ADS)
Zuloaga, P.; Ordoñez, M.; Andrade, C.; Castellote, M.
2011-04-01
The generic design of the centralised spent fuel storage facility was approved by the Spanish Safety Authority in 2006. The planned operational life is 60 years, while the design service life is 100 years. Durability studies and surveillance of the behaviour have been considered from the initial design steps, taking into account the accessibility limitations and temperatures involved. The paper presents an overview of the ageing management program set in support of the Performance Assessment and Safety Review of El Cabril low and intermediate level waste (LILW) disposal facility. Based on the experience gained for LILW, ENRESA has developed a preliminary definition of the Ageing Management Plan for the Centralised Interim Storage Facility of spent Fuel and High Level Waste (HLW), which addresses the behaviour of spent fuel, its retrievability, the confinement system and the reinforced concrete structure. It includes tests plans and surveillance design considerations, based on the El Cabril LILW disposal facility.
15 CFR 923.47 - Designated State agency.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Authorities and Organization § 923.47 Designated State... coordinate other State or local programs, plans and/or policies within the coastal zone; (ii) To what extent... management or regulatory authorities affecting the coastal zone presently are administered by the agency; and...
15 CFR 923.47 - Designated State agency.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Authorities and Organization § 923.47 Designated State... coordinate other State or local programs, plans and/or policies within the coastal zone; (ii) To what extent... management or regulatory authorities affecting the coastal zone presently are administered by the agency; and...
DOT National Transportation Integrated Search
1997-06-19
NASA and the Federal Aviation Administration (FAA) have designed and developed an automation tool known as the Traffic Management Advisor (TMA). The TMA is a time-based strategic planning tool that provides Traffic Management Coordinators (TMCs) and ...
Sustainable urban development in Brisbane City--the Holy Grail?
Rahman, K; Weber, T
2003-01-01
Impacts from urban stormwater runoff on receiving environments have been well documented, particularly through specific regional scientific studies. Using various local government planning and management elements, urban developments in Brisbane City are now able to address stormwater management in an increasingly holistic context. One key initiative includes facilitating Water Sensitive Urban Design (WSUD) components within an Integrated Water Management Strategy that looks at policy formation, planning strategies, design option, community marketing and acceptance, maintenance programs and finally evaluation of various WSUD approaches. These can include the use of Natural Channel Designs, grassed swales, bio-filtration systems, porous pavements and roofwater tanks in several economic combinations. By linking with the Cooperative Research Centre for Catchment Hydrology, Brisbane City Council has influenced the design of WSUD planning tools and benefited the city with academic inputs into extensive evaluation programs. As well, it has also contributed to the Cooperative Research Centre's research outcomes. These evaluation programs are increasingly providing better understanding of various stormwater quality best management practices throughout Australia. As part of the overall implementation process, active involvement by a range of stakeholders has been crucial. These stakeholders have included internal planning, development assessment and design staff, external consultants, developers, and other local and state government agencies. The latter two groups are assisting in the important task of "regionalisation" of Brisbane City Council's policies and guidelines. Implementation of WSUD initiatives and stormwater re-use strategies under Council's new "Integrated Water Management" agenda are showing some excellent results, suggesting that sustainable urban development is no longer like the search for the Holy Grail.
DOT National Transportation Integrated Search
2016-08-01
The purpose of this research report is to develop a Strategic Enterprise Architecture (EA) Design and Implementation Plan for the Montana Department of Transportation (MDT). Information management systems are vital to maintaining the States transp...
Triple Science GCSEs: Curriculum Planning and Design. GCSEs in Biology, Chemistry and Physics
ERIC Educational Resources Information Center
Morris, Pam; Quill, John
2007-01-01
This publication will provide managers and others with practical advice on how to plan, develop and model the Triple Science requirement, taking into account all the critical factors that need to be considered. This guidance concentrates on curriculum planning and design, including the use of the new (2006) specifications to provide Triple Science…
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
77 FR 38801 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...
75 FR 1405 - National Park Service
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
...: Notice of availability of the Record of Decision for the General Management Plan/Environmental Impact...) announces the availability of a Record of Decision (ROD) for the General Management Plan/Environmental... Arch grounds by water taxi. A new external and internal visitor transportation system will be designed...
The flight planning - flight management connection
NASA Technical Reports Server (NTRS)
Sorensen, J. A.
1984-01-01
Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.
Halon 1301 management planning guidance
NASA Astrophysics Data System (ADS)
1995-05-01
This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.
An Empty Toolbox? Changes in Health Plans’ Approaches for Managing Costs and Care
Mays, Glen P; Hurley, Robert E; Grossman, Joy M
2003-01-01
Objective To examine how health plans have changed their approaches for managing costs and utilization in the wake of the recent backlash against managed care. Data Sources/Study Setting Semistructured interviews with health plan executives, employers, providers, and other health care decision makers in 12 metropolitan areas that were randomly selected to be nationally representative of communities with more than 200,000 residents. Longitudinal data were collected as part of the Community Tracking Study during three rounds of site visits in 1996–1997, 1998–1999, and 2000–2001. Study Design Interviews probed about changes in the design and operation of health insurance products—including provider contracting and network development, benefit packages, and utilization management processes—and about the rationale and perceived impact of these changes. Data Collection/Extraction Methods Data from more than 850 interviews were coded, extracted, and analyzed using computerized text analysis software. Principal Findings Health plans have begun to scale back or abandon their use of selected managed care tools in most communities, with selective contracting and risk contracting practices fading most rapidly and completely. In turn, plans increasingly have sought cost savings by shifting costs to consumers. Some plans have begun to experiment with new provider networks, payment systems, and referral practices designed to lower costs and improve service delivery. Conclusions These changes promise to lighten administrative and financial burdens for physicians and hospitals, but they also threaten to increase consumers’ financial burdens. PMID:12650372
of Expertise Customer service Technically savvy Event planning Word processing/desktop publishing Database management Research Interests Website design Database design Computational science Technology Consulting, Westminster, CO (2007-2012) Administrative Assistant, Source One Management, Denver, CO (2005
Managing aggression in a psychiatric hospital using a behaviour plan: a case study.
Bisconer, S W; Green, M; Mallon-Czajka, J; Johnson, J S
2006-10-01
This paper focuses on the critical role of nursing in implementing a behaviour plan in a psychiatric hospital. The plan was implemented with a 40-year-old man with a long history of aggression towards others and self. The study used a single-subject research design with baseline and intervention phases (AB Design). Data were collected on (1) frequency of incidents of aggression towards others and self; (2) use of restrictive interventions to manage aggression (i.e. restraints, pro re nata medication, 1:1 special observation); and (3) frequency of staff injury. The data show a decrease in frequency of aggression towards others and self, a concurrent reduction in the use of restrictive interventions to manage aggression, and a decrease in incidents of staff injury. The behaviour plan helped staff maintain a safe and therapeutic milieu. The behaviour plan has given the patient an opportunity to learn positive replacement behaviours and skills, and the opportunity eventually to leave the hospital to live in a less restrictive community home.
DOT National Transportation Integrated Search
2008-12-01
Users guide for a sketch planning tool for exploring policy alternatives. It is intended for an audience of transportation professionals responsible for planning, designing, funding, operating, enforcing, monitoring, and managing HOV and HOT lanes...
The site designation for the Western and Central Long Island Sound disposal sites requires the completion of a Dredged Material Management Plan (DMMP) and EPA to conduct an annual review of progress toward completion of the DMMP.
Guidelines for Local Governments on Solid Waste Management.
ERIC Educational Resources Information Center
National Association of Counties, Washington, DC. Research Foundation.
This document consists of ten guides on Solid Waste Management to assist local elected and appointed policy-making officials. They are entitled: Areawide Approaches; Legal Authority, Planning, Organization Design and Operation, Financing, Technical and Financial Assistance, Citizen Support, Personnel, and Action Plan and Bibliography. The guides…
Management Planning and Control: Supporting Knowledge-Intensive Organizations
ERIC Educational Resources Information Center
Herremans, Irene M.; Isaac, Robert G.
2005-01-01
Purpose: The purpose of this paper is to develop propositions for empirical validation regarding appropriate management planning and control systems (MPACS) in knowledge-intensive organizations. Design/methodology/approach: The propositions were developed from interviews with members of a knowledge-intensive virtual organization that is known for…
ERIC Educational Resources Information Center
Nowrasteh, Daryush M.
This publication is designed to serve state-level planners interested in reviewing the key concepts of state planning and management systems. The compact nature of the review and its organization in guideline format should provide a ready reference for the practitioner seeking to develop and improve management systems for vocational education in…
ERIC Educational Resources Information Center
APPA: Association of Higher Education Facilities Officers, Alexandria, VA.
The 23 papers presented in this Proceedings are grouped into four categories: business management; facilities planning, design, and construction; human resource management; and energy and environment. Papers are: (1) "A Business Approach to the Facility Function" (Alan B. Abramson); (2) "Management by Strategic Planning" (Jerry C. Black); (3)…
Planning in the human ecotone: Managing wild places on the Togiak National Wildlife Refuge
Stewart Allen
2002-01-01
The U.S. Fish and Wildlife Service is revising the long-range plan for Alaskaâs Togiak National Wildlife Refuge, over half of which is designated as the Togiak Wilderness Area. Many of the planning issues are social rather than biological, involving public use and its effects on Refuge resources and opportunities. Planners, managers, and stakeholders are finding...
Integrating Personalized and Community Services for Mobile Travel Planning and Management
NASA Astrophysics Data System (ADS)
Yu, Chien-Chih
Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.
Fetterolf, Donald E; Terry, Rachel
2007-02-01
Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.
NASA Technical Reports Server (NTRS)
Knighton, Donna L.
1992-01-01
A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Public Contracts and Property Management Federal Property Management Regulations System (Continued... an expansion need is identified to exist; (e) Create a landscape design that is a pleasant, dynamic...
25 CFR 170.500 - What program reviews do the Secretaries conduct?
Code of Federal Regulations, 2010 CFR
2010-04-01
... Section 170.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... planning; (3) Design; (4) Contract administration; (5) Construction; (6) Financial management; and (7...
NASA Astrophysics Data System (ADS)
Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry
2001-07-01
SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.
An Update on Asset Management Plans in the United Kingdom.
ERIC Educational Resources Information Center
Patel, Mukund
1999-01-01
Describes a current project in the United Kingdom designed to improve school buildings. The use of Asset Management Plans (AMPs) in providing the means through which likely future needs are assessed, criteria for prioritization are set, and informed decisions on local spending are made are examined. (GR)
Examining the Planning and Management of Principal Succession
ERIC Educational Resources Information Center
Zepeda, Sally J.; Bengtson, Ed; Parylo, Oksana
2012-01-01
Purpose: The purpose of this study is to examine principal succession planning and management by analyzing current practices of handling school leader succession in four Georgia school systems. Design/methodology/approach: Looking through the lens of organizational leadership succession theory, the practices of school systems as they experienced…
State of Alaska Skip to main content myAlaska Departments State Employees Statewide Links Recreation Search DNR State of Alaska Home Menu Parks Home Alaska State Trails Boating Safety Design and Information Strategic Plan Division Organization Chart State Parks History Park Management Management Plans
An empty toolbox? Changes in health plans' approaches for managing costs and care.
Mays, Glen P; Hurley, Robert E; Grossman, Joy M
2003-02-01
To examine how health plans have changed their approaches for managing costs and utilization in the wake of the recent backlash against managed care. Semistructured interviews with health plan executives, employers, providers, and other health care decision makers in 12 metropolitan areas that were randomly selected to be nationally representative of communities with more than 200,000 residents. Longitudinal data were collected as part of the Community Tracking Study during three rounds of site visits in 1996-1997, 1998-1999, and 2000-2001. Interviews probed about changes in the design and operation of health insurance products--including provider contracting and network development, benefit packages, and utilization management processes--and about the rationale and perceived impact of these changes. Data from more than 850 interviews were coded, extracted, and analyzed using computerized text analysis software. Health plans have begun to scale back or abandon their use of selected managed care tools in most communities, with selective contracting and risk contracting practices fading most rapidly and completely. In turn, plans increasingly have sought cost savings by shifting costs to consumers. Some plans have begun to experiment with new provider networks, payment systems, and referral practices designed to lower costs and improve service delivery. These changes promise to lighten administrative and financial burdens for physicians and hospitals, but they also threaten to increase consumers' financial burdens.
Maas-Hebner, Kathleen G.; Schreck, Carl B.; Hughes, Robert M.; Yeakley, Alan; Molina, Nancy
2016-01-01
We discuss the importance of addressing diffuse threats to long-term species and habitat viability in fish conservation and recovery planning. In the Pacific Northwest, USA, salmonid management plans have typically focused on degraded freshwater habitat, dams, fish passage, harvest rates, and hatchery releases. However, such plans inadequately address threats related to human population and economic growth, intra- and interspecific competition, and changes in climate, ocean, and estuarine conditions. Based on reviews conducted on eight conservation and/or recovery plans, we found that though threats resulting from such changes are difficult to model and/or predict, they are especially important for wide-ranging diadromous species. Adaptive management is also a critical but often inadequately constructed component of those plans. Adaptive management should be designed to respond to evolving knowledge about the fish and their supporting ecosystems; if done properly, it should help improve conservation efforts by decreasing uncertainty regarding known and diffuse threats. We conclude with a general call for environmental managers and planners to reinvigorate the adaptive management process in future management plans, including more explicitly identifying critical uncertainties, implementing monitoring programs to reduce those uncertainties, and explicitly stating what management actions will occur when pre-identified trigger points are reached.
Embedding ecosystem services in coastal planning leads to better outcomes for people and nature
Arkema, Katie K.; Verutes, Gregory M.; Wood, Spencer A.; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M.; Griffin, Robert; Guerry, Anne D.
2015-01-01
Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize’s coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions. PMID:26082545
Embedding ecosystem services in coastal planning leads to better outcomes for people and nature.
Arkema, Katie K; Verutes, Gregory M; Wood, Spencer A; Clarke-Samuels, Chantalle; Rosado, Samir; Canto, Maritza; Rosenthal, Amy; Ruckelshaus, Mary; Guannel, Gregory; Toft, Jodie; Faries, Joe; Silver, Jessica M; Griffin, Robert; Guerry, Anne D
2015-06-16
Recent calls for ocean planning envision informed management of social and ecological systems to sustain delivery of ecosystem services to people. However, until now, no coastal and marine planning process has applied an ecosystem-services framework to understand how human activities affect the flow of benefits, to create scenarios, and to design a management plan. We developed models that quantify services provided by corals, mangroves, and seagrasses. We used these models within an extensive engagement process to design a national spatial plan for Belize's coastal zone. Through iteration of modeling and stakeholder engagement, we developed a preferred plan, currently under formal consideration by the Belizean government. Our results suggest that the preferred plan will lead to greater returns from coastal protection and tourism than outcomes from scenarios oriented toward achieving either conservation or development goals. The plan will also reduce impacts to coastal habitat and increase revenues from lobster fishing relative to current management. By accounting for spatial variation in the impacts of coastal and ocean activities on benefits that ecosystems provide to people, our models allowed stakeholders and policymakers to refine zones of human use. The final version of the preferred plan improved expected coastal protection by >25% and more than doubled the revenue from fishing, compared with earlier versions based on stakeholder preferences alone. Including outcomes in terms of ecosystem-service supply and value allowed for explicit consideration of multiple benefits from oceans and coasts that typically are evaluated separately in management decisions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vugrin, K.W.; Twitchell, Ch.A.
2008-07-01
Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This papermore » discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZ910000.L13400000.DT0000.LXSS058A0000] Notice of Availability of the Final Environmental Impact Statement for the Restoration Design Energy Project and Proposed Resource Management Plan Amendments, AZ AGENCY: Bureau of Land Management, Interior...
ERIC Educational Resources Information Center
Rabin, Colette; Smith, Grinell
2016-01-01
As teacher educators, the authors developed an assignment focused on care ethics to prepare teacher candidates to design classroom-management procedures aimed at cultivating caring community. The teacher candidates revised traditional classroom-management processes, such as class rules, into cocreated norms. They also designed original management…
On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process
NASA Astrophysics Data System (ADS)
Hongzhi, Zhao; Jian, Zhang
2018-03-01
The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.
AAFES Shopping Center Environmental Assessment
2009-08-01
Plan H2S Hydrogen Sulfide SO2 Sulfur Dioxide HWMP Hazardous Waste Management Plan SMW Strategic Missile Wing ICBM Intercontinental Ballistic Missile...the no-action alternative. Land Management and Use. A waiver would be needed prior to construction to change the land use designation from Open...occur under the no-action alternative. Hazardous Materials and Waste Management . No changes to hazardous materials or waste streams would occur
Study of airborne science experiment management concepts for application to space shuttle, volume 2
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Reller, J. O., Jr.; Neel, C. B.; Haughney, L. C.
1973-01-01
Airborne research management and shuttle sortie planning at the Ames Research Center are reported. Topics discussed include: basic criteria and procedures for the formulation and approval of airborne missions; ASO management structure and procedures; experiment design, development, and testing aircraft characteristics and experiment interfaces; information handling for airborne science missions; mission documentation requirements; and airborne science methods and shuttle sortie planning.
IPG Job Manager v2.0 Design Documentation
NASA Technical Reports Server (NTRS)
Hu, Chaumin
2003-01-01
This viewgraph presentation provides a high-level design of the IPG Job Manager, and satisfies its Master Requirement Specification v2.0 Revision 1.0, 01/29/2003. The presentation includes a Software Architecture/Functional Overview with the following: Job Model; Job Manager Client/Server Architecture; Job Manager Client (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Job Manager Server (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Development Environment; Project Plan; Requirement Traceability.
Flexibility in flood management design: proactive planning under uncertainty
NASA Astrophysics Data System (ADS)
Smet, K.; de Neufville, R.; van der Vlist, M.
2016-12-01
This paper presents a value-enhancing approach for proactive planning and design of long-lived flood management infrastructure given uncertain future flooding threats. Designing infrastructure that can be adapted over time is a method to safeguard the efficacy of current design decisions given future uncertainties. We explore the value of embedding "options" in a physical structure, where an option is the right but not the obligation to do something at a later date (e.g. over-dimensioning a floodwall foundation now facilitates a future height addition in response to observed increases in sea level; building extra pump bays in a drainage pumping station enables the easy addition of pumping capacity whenever increased precipitation warrants an expansion.) The proposed approach couples a simulation model that captures future climate induced changes to the hydrologic operating environment of a structure, with an economic model that estimates the lifetime economic performance of alternative investment strategies. The economic model uses Real "In" Options analysis, a type of cash flow analysis that quantifies the implicit value of options and the flexibility they provide. We demonstrate the approach using replacement planning for the multi-functional pumping station IJmuiden on the North Sea Canal in the Netherlands. The analysis models flexibility in design decisions, varying the size and specific options included in the new structure. Results indicate that the incorporation of options within the structural design has the potential to improve its economic performance, as compared to more traditional, "build it once and build it big" designs where flexibility is not an explicit design criterion. The added value resulting from the incorporation of flexibility varies with the range of future conditions considered, and the specific options examined. This approach could be applied to explore investment strategies for the design of other flood management structures, as well as be expanded to look more at flexibility within an infrastructure network rather than a single structure. Flexibility in flood management design:proactive planning under uncertainty
Planning for School Emergencies.
ERIC Educational Resources Information Center
Della-Giustina, Daniel E.
This document is designed to provide civil leaders and school administrators with a resource that will enable them to develop comprehensive contingency plans for specific emergency situations. A discussion of disaster and emergency management planning includes an outline of the objectives of emergency planning that were established for this guide.…
Principal Challenges Facing Electronic Records Management in Federal Agencies Today.
ERIC Educational Resources Information Center
Patterson, Giovanna; Sprehe, J. Timothy
2002-01-01
Discusses electronic records management in the federal government. Highlights include managing electronic mail; information technology planning, systems design, and architecture; updating conventional records management; integrating electronic records management with other information technology systems; challenges of end-user training; business…
Deployment strategies of managed lanes on arterials.
DOT National Transportation Integrated Search
2015-02-01
This report investigates issues related to planning, financing, deployment, and operation of managed : lanes on arterials. In this report, a strategy for managed lanes refers to a combination of the managed : lane type, the design and implementation,...
DOT National Transportation Integrated Search
2010-02-01
This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...
Design of an advanced flight planning system
NASA Technical Reports Server (NTRS)
Sorensen, J. A.; Goka, T.
1985-01-01
The demand for both fuel conservation and four-dimensional traffic management require that the preflight planning process be designed to account for advances in airborne flight management and weather forecasting. The steps and issues in designing such an advanced flight planning system are presented. Focus is placed on the different optimization options for generating the three-dimensional reference path. For the cruise phase, one can use predefined jet routes, direct routes based on a network of evenly spaced grid points, or a network where the grid points are existing navaid locations. Each choice has its own problem in determining an optimum solution. Finding the reference path is further complicated by choice of cruise altitude levels, use of a time-varying weather field, and requiring a fixed time-of-arrival (four-dimensional problem).
Modular space station phase B extension program master plan
NASA Technical Reports Server (NTRS)
Munsey, E. H.
1971-01-01
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
..., management, maintenance, and monitoring of conservation lands used to mitigate the effects of the other.... The LOHCP is a comprehensive plan designed to provide long-term conservation and management of... Maintenance: Public and private utility company activities to operate and maintain, including repair and...
A Model for Talent Management and Career Planning
ERIC Educational Resources Information Center
Waheed, Sajjad; Zaim, A. Halim
2015-01-01
This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…
Designing Therapeutic Recreation Programs in the Community.
ERIC Educational Resources Information Center
Carter, Marcia Jean; And Others
This publication is designed to assist in the development of therapeutic recreation services in the community and may also be used in the preparation of procedural manuals or risk management plans. Therapeutic recreation is defined as the process of assessment, planning, implementation, and evaluation, applied through a helping relationship to…
7 CFR 25.204 - Evaluation of the strategic plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and design. The extent to which the plan considers issues of design and amenities that will foster a..., land and water uses, waste management, environmental protection and the vitality of life of the... participants and contributors to their community, and to succeed in an increasingly competitive global economy...
75 FR 13275 - Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
... Designation, Motorized Travel Management, (Formerly Motorized Route Designation), Implementation, Siskiyou... travel management planning process and season of use and wet weather closures, and recommended the action... Yosemite Institute Environment Education Campus, Implementation, Mariposa County, CA. Summary: No formal...
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda Shaller; Willoughby, John K.
1991-01-01
Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
...-9460. 4. Mail: Steven Brown, Atmospheric Section, Air Planning and Development Branch, Air and Waste..., Kansas 66101. 5. Hand Delivery or Courier: Steven Brown, Atmospheric Section, Air Planning and... Atmospheric Section, Air Planning and Development Branch, Air Waste and Management Division, U.S...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2010 CFR
2010-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2011 CFR
2011-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2012 CFR
2012-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2013 CFR
2013-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
25 CFR 170.502 - Are management systems required for the IRR Program?
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...
Integrated Advanced Sounding Unit-A (AMSU-A). Configuration Management Plan
NASA Technical Reports Server (NTRS)
Cavanaugh, J.
1996-01-01
The purpose of this plan is to identify the baseline to be established during the development life cycle of the integrated AMSU-A, and define the methods and procedures which Aerojet will follow in the implementation of configuration control for each established baseline. Also this plan establishes the Configuration Management process to be used for the deliverable hardware, software, and firmware of the Integrated AMSU-A during development, design, fabrication, test, and delivery.
NASA Astrophysics Data System (ADS)
Liang, Likai; Bi, Yushen
Considered on the distributed network management system's demand of high distributives, extensibility and reusability, a framework model of Three-tier distributed network management system based on COM/COM+ and DNA is proposed, which adopts software component technology and N-tier application software framework design idea. We also give the concrete design plan of each layer of this model. Finally, we discuss the internal running process of each layer in the distributed network management system's framework model.
The Internet and managed care: a new wave of innovation.
Goldsmith, J
2000-01-01
Managed care firms have been under siege in the political system and the marketplace for the past few years. The rise of the Internet has brought into being powerful new electronic tools for automating administrative and financial processes in health insurance. These tools may enable new firms or employers to create custom-designed networks connecting their workers and providers, bypassing health plans altogether. Alternatively, health plans may use these tools to create a new consumer-focused business model. While some disintermediation of managed care plans may occur, the barriers to adoption of Internet tools by established plans are quite low. Network computing may provide important leverage for health plans not only to retain their franchises but also to improve their profitability and customer service.
NASA Technical Reports Server (NTRS)
Ebersole, M. M.
1983-01-01
JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... rehabilitation specialist, and the veteran. (c) Implementation of the plan. The vocational rehabilitation specialist or counseling psychologist designated as case manager has the primary role in carrying out...
Krinn, Kelly; Karaca-Mandic, Pinar; Blewett, Lynn A
2015-01-01
The state-based and federally facilitated health insurance Marketplaces, or exchanges, enrolled more than eight million people during the first open enrollment period, which ended March 31, 2014. There is significant variation in how states have designed and implemented their Marketplaces. We examined how premiums varied with states' involvement in the Marketplaces through governance, plan management authority, and strategy during the first year that the exchanges have been open. State-based Marketplaces using "clearinghouse" plan management models had significantly lower adjusted average premiums for all plans within each metal level compared to state-based Marketplaces using "active purchaser" models and the federally facilitated and partnership Marketplaces. Clearinghouse management models are those in which all health plans that meet published criteria are accepted. Active purchaser models are those in which states negotiate premiums, provider networks, number of plans, and benefits. Our baseline estimates provide valuable benchmarks for evaluating future performance of states' involvement in governance, plan management, and regulatory authority of the insurance Marketplaces. Project HOPE—The People-to-People Health Foundation, Inc.
Managed Care Quality of Care and Plan Choice in New York SCHIP
Liu, Hangsheng; Phelps, Charles E; Veazie, Peter J; Dick, Andrew W; Klein, Jonathan D; Shone, Laura P; Noyes, Katia; Szilagyi, Peter G
2009-01-01
Objective To examine whether low-income parents of children enrolled in the New York State Children's Health Insurance Program (SCHIP) choose managed care plans with better quality of care. Data Sources 2001 New York SCHIP evaluation data; 2001 New York State Managed Care Plan Performance Report; 2000 New York State Managed Care Enrollment Report. Study Design Each market was defined as a county. A final sample of 2,325 new enrollees was analyzed after excluding those in markets with only one SCHIP plan. Plan quality was measured using seven Consumer Assessment of Health Plans Survey (CAHPS) and three Health Plan Employer Data and Information Set (HEDIS) scores. A conditional logit model was applied with plan and individual/family characteristics as covariates. Principle Findings There were 30 plans in the 45 defined markets. The choice probability increased 2.5 percentage points for each unit increase in the average CAHPS score, and the association was significantly larger in children with special health care needs. However, HEDIS did not show any statistically significant association with plan choice. Conclusions Low-income parents do choose managed care plans with higher CAHPS scores for their newly enrolled children, suggesting that overall quality could improve over time because of the dynamics of enrollment. PMID:19208091
Groundwater regulation and integrated planning
Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.
2016-01-01
The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.
Optimizing Security of Cloud Computing within the DoD
2010-12-01
information security governance and risk management; application security; cryptography; security architecture and design; operations security; business ...governance and risk management; application security; cryptography; security architecture and design; operations security; business continuity...20 7. Operational Security (OPSEC).........................................................20 8. Business Continuity Planning (BCP) and Disaster
The Automated Logistics Element Planning System (ALEPS)
NASA Technical Reports Server (NTRS)
Schwaab, Douglas G.
1991-01-01
The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.
1994-07-18
09 Software Product Training 3 .4 .11 Physical Cues Segment Development3 .01 Technical Management .02 SW Requirements Analysis .03 Preliminary Design...Mission Planning Subsystem Development3 .01 Technical Management .02 SW Requirements Analysis .03 Preliminary Design - .04 Detailed Design .05 Code & CSU
Taheri, Safoura; Ehsanpour, Soheila; Kohan, Shahnaze; Farzi, Saba; Jaafarpour, Molouk; Direkvand-Moghaddam, Ashraf
2014-03-01
Family planning is a lifestyle that is selected voluntarily and is based on the knowledge, attitude and responsible decision making by couples in order to promote the health and welfare of the family and the advancement of the society. In this regard, family planning counseling plays an important role in making informed decisions if used properly and in a responsible way. Detection of individual barriers in family planning counseling based on the viewpoints of managers, employees and clients who are key participants in the healthcare service provision is a major step towards appropriate planning to modify or eliminate such barriers. The present study was conducted with the goal of comparing managers', employees' and clients' viewpoints about individual barriers in family planning counseling in health care centers in Isfahan in 2012. This was a cross-sectional one-step three-group comparative descriptive study conducted on 295 subjects including 59 managers, 110 employees and 126 clients in medical health care centers in Isfahan in 2012. The managers and employees were selected by census sampling, and the clients were recruited through convenient random sampling. The data collection tool was a researcher-designed questionnaire, which was designed in two sections of fertility and personal characteristics, and viewpoint measurement. Descriptive and inferential statistical tests were used to analyze the data. The obtained results showed significant differences between mean scores of viewpoints in three groups of managers, employees and clients concerning individual barriers in family planning counseling. In addition, most of the managers, employees and clients reported individual barriers as an intermediate level barrier in the process of family planning counseling. Results indicate that subjects in three studied groups hold different views regarding the individual barriers in family planning counseling. This difference in the perspectives may be a factor that affects the quality of the provided services. Therefore, it is necessary for the healthcare providers to consider the main concerns of their clients regarding family planning.
DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
NASA Technical Reports Server (NTRS)
Vicroy, D. D.; Knox, C. E.
1983-01-01
A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight management descent algorithm and the vertical performance modeling required for the DC-10 airplane is described.
15 CFR 921.32 - Operation and management: Implementation of the management plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management of...
ERIC Educational Resources Information Center
Lam, Yan Yan
2010-01-01
This paper focuses on the impact of globalization in the domain of higher education, particularly, design education. It reviews how globalization may affect educational policy and planning in Hong Kong by drawing on an empirical study involving senior management, a course leader and a design trainer/facilitator. This paper not only illustrates the…
NOSC Program Managers Handbook. Revision 1
1988-02-01
cost. The effects of application of life-cycle cost analysis through the planning and RIDT&E phases of a program, and the " design to cost" concept on...is the plan for assuring the quality of the design , design documentation, and fabricated/assembled hardware and associated computer software. 13.5.3.2...listings and printouts, which document the n. requirements, design , or details of compute : software; explain the capabilities and limitations of the
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Modular space station, phase B extension. Program operations plan
NASA Technical Reports Server (NTRS)
1971-01-01
An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-29
... plan decisions were adopted. For example, the EPA's CCMA Asbestos Exposure and Human Health Risk... to asbestos by reducing airborne emissions of asbestos. For example, the CCMA Proposed RMP designates... asbestos; and use would be limited to highway-licensed vehicles by permit only. Under the Proposed RMP, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... acres of pine stands using a variety of methods to treat MPB infested stands, reduce the overall density... actions proposed are in direct response to management direction provided by the Black Hills National Forest Land and Resource Management Plan (Forest Plan). The site specific actions are designed, based on...
ERIC Educational Resources Information Center
Cotter, Barbara
Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…
Plan-Do-Check-Act and the Management of Institutional Research. AIR 1992 Annual Forum Paper.
ERIC Educational Resources Information Center
McLaughlin, Gerald W.; Snyder, Julie K.
This paper describes the application of a Total Quality Management strategy called Plan-Do-Check-Act (PDCA) to the projects and activities of an institutional research office at the Virginia Polytechnic Institute and State University. PDCA is a cycle designed to facilitate incremental continual improvement through change. The specific steps are…
An alternate property tax program requiring a forest management plan and scheduled harvesting
D.F. Dennis; P.E. Sendak
1991-01-01
Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...
ERIC Educational Resources Information Center
Abikoff, Howard; Nissley-Tsiopinis, Jenelle; Gallagher, Richard; Zambenedetti, Maurizio; Seyffert, Michael; Boorady, Roy; McCarthy, John
2009-01-01
A double-blind, placebo-controlled, crossover design study was done to evaluate the effects of methylphenidate-osmotic-release oral systems (MPH-OROS) on the organization, time management, and planning (OTMP) of children with attention deficit hyperactivity disorder (ADHD). Results show significant improvements on the OTMP of children with ADHD in…
Brown, Mark J F; Sainsbury, Anthony W; Vaughan-Higgins, Rebecca J; Measures, Gavin H; Jones, Catherine M; Gammans, Nikki
2017-03-01
Reintroductions can play a key role in the conservation of endangered species. Parasites may impact reintroductions, both positively and negatively, but few case studies of how to manage parasites during reintroductions exist. Bumblebees are in decline at regional and global scales, and reintroductions can be used to re-establish extinct local populations. Here we report on how the risks associated with parasites are being managed in an ongoing reintroduction of the short-haired bumblebee, Bombus subterraneus, to the UK. Disease risk analysis was conducted and disease risk management plans constructed to design a capture-quarantine-release system that minimised the impacts on both the bumblebees and on their natural parasites. Given that bumblebee parasites are (i) generalists, (ii) geographically ubiquitous, and (iii) show evidence of local adaptation, the disease risk management plan was designed to limit the co-introduction of parasites from the source population in Sweden to the destination site in the UK. Results suggest that this process at best eliminated, or at least severely curtailed the co-introduction of parasites, and ongoing updates of the plan enabled minimization of impacts on natural host-parasite dynamics in the Swedish source population. This study suggests that methods designed for reintroductions of vertebrate species can be successfully applied to invertebrates. Future reintroductions of invertebrates where the parasite fauna is less well known should take advantage of next-generation barcoding and multiple survey years prior to the start of reintroductions, to develop comprehensive disease risk management plans.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-24
... Incinerators'' (HMIWI). The Indiana Department of Environmental Management (IDEM) submitted the revised State... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0086; FRL-9663-2] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...
NASA Astrophysics Data System (ADS)
Pries-Heje, Jan; Baskerville, Richard L.
This paper elaborates a design science approach for management planning anchored to the concept of a management design theory. Unlike the notions of design theories arising from information systems, management design theories can appear as a system of technological rules, much as a system of hypotheses or propositions can embody scientific theories. The paper illus trates this form of management design theories with three grounded cases. These grounded cases include a software process improvement study, a user involvement study, and an organizational change study. Collectively these studies demonstrate how design theories founded on technological rules can not only improve the design of information systems, but that these concepts have great practical value for improving the framing of strategic organi zational design decisions about such systems. Each case is either grounded in an empirical sense, that is to say, actual practice, or it is grounded to practices described extensively in the practical literature. Such design theories will help managers more easily approach complex, strategic decisions.
Designing the role of the embedded care manager.
Hines, Patricia; Mercury, Marge
2013-01-01
: The role of the professional case manager is changing rapidly. Health reform has called upon the industry to ensure that care is delivered in an efficient, effective, and high-quality and low cost manner. As a means to achieve this objective, health plans and health systems are moving the care manager out of a centralized location within their organizations to "embedding" them into physician offices. This move enables the care manager to work alongside the primary care physicians and their high-risk patients. This article discusses the framework for designing and implementing an embedded care manager role into a physician practice. Key elements of the program are discussed. IMPLICATIONS FOR CARE MANAGEMENT:: Historically care management has played a foundational role in improving the quality of care for individuals and populations via the efficient and effective use of resources. Now with the goals of health care reform, a successful transition from a volume-based to value-based reimbursement system requires primary care physicians to welcome care managers into their practices to improve patient care, quality, and costs through care coordination across health care settings and populations. : As patient-centered medical homes and integrated delivery systems formulate their plans for population health management, their efforts have included embedding a care manager in the primary practice setting. Having care managers embedded at the physician offices increases their ability to collaborate with the physician and their staff in the implementation and monitoring care plans for their patients. : Implementing an embedded care manager into an existing physician's practice requires the following:Although the embedded care manager is a highly evolving role, physician groups are beginning to realize the benefits from their care management collaborations. Examples cited include improved outreach and coordination, patient adherence to care plans, and improved quality of life.
Newig, Jens; Kochskämper, Elisa; Challies, Edward; Jager, Nicolas W
2016-01-01
The importance of designing suitable participatory governance processes is generally acknowledged. However, less emphasis has been put on how decision-makers design such processes, and how they learn about doing so. While the policy learning literature has tended to focus on the substance of policy, little research is available on learning about the design of governance. Here, we explore different approaches to learning among German policymakers engaged in implementing the European Floods Directive. We draw on official planning documents and expert interviews with state-level policymakers to focus on learning about the procedural aspects of designing and conducting participatory flood risk management planning. Drawing on the policy learning and evidence-based governance literatures, we conceptualise six types of instrumental 'governance learning' according to sources of learning (endogenous and exogenous) and modes of learning (serial and parallel). We empirically apply this typology in the context of diverse participatory flood risk management planning processes currently unfolding across the German federal states. We find that during the first Floods Directive planning cycle, policymakers have tended to rely on prior experience in their own federal states with planning under the Water Framework Directive to inform the design and carrying out of participatory processes. In contrast, policymakers only sporadically look to experiences from other jurisdictions as a deliberate learning strategy. We argue that there is scope for more coordinated and systematic learning on designing effective governance, and that the latter might benefit from more openness to experimentation and learning on the part of policymakers.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham fine... implementation plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
... the Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham... implementation plan (SIP) to include the 2006 24-hour PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...
Currie, Kay; Grundy, Maggie
2011-10-01
To highlight implications for managers from the implementation of a national advanced practice succession planning development pathway within Scotland. Internationally, advanced practice posts have often developed in an ad-hoc manner, with little organizational attention to succession planning. Evaluation of a pilot national succession planning development pathway identified mechanisms which facilitate or hamper effective planning for advanced practice roles. A responsive evaluation design incorporating semi-structured questionnaires to pathway participants (n = 15) and semi-structured telephone interviews with case-site pathway participants (n = 7) and their line managers. Managers believed the development pathway was worthwhile; however, there was limited strategic planning to match individuals' development to service need. Practitioners generally perceived managers as interested in their development, although levels of practical support varied. There is concern from both managers and practitioners regarding ongoing funding for advanced practice development. The present evaluation study reiterates the need for organizational commitment to succession planning including robust service needs analysis mechanisms and adequate funding for development processes. Nurse managers are viewed as the 'gatekeepers' to opportunities for developing advanced nurse practitioners; scare resources must be targeted effectively to support succession planning through the development of selected individuals for future advanced practice posts, justified by service need. © 2011 Blackwell Publishing Ltd.
Applying the concept of wilderness character to national forest planning, monitoring, and management
Peter Landres; Mary Beth Hennessy; Kimberly Schlenker; David N. Cole; Steve Boutcher
2008-01-01
The U.S. Forest Service is responsible for managing over 35 million acres of designated wilderness, about 18 percent of all the land managed by the agency. Nearly all (90 percent) of the National Forests and Grasslands administer designated wilderness. Although the central mandate from the 1964 Wilderness Act is that the administering agencies preserve the wilderness...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... the 10 (C) area beyond the 3 year standard and guideline timeframe identified in the Plan; [[Page... Management Area 10 (C) Route and Area Designation AGENCY: Forest Service, USDA. ACTION: Notice of intent to... Off Road Vehicle (ORV) routes within Management Area (MA) 10 (C) of the Oregon Dunes National...
Pest Management Specialist (AFSC 56650).
ERIC Educational Resources Information Center
Air Univ., Gunter AFS, Ala. Extension Course Inst.
This eight-volume student text is designed for use by Air Force personnel enrolled in a self-study extension course for pest management specialists. Covered in the individual volumes are civil engineering; pest management (entomology, pest management planning and coordination, and safety and protective equipment); pest management chemicals and…
NASA Astrophysics Data System (ADS)
Kouziokas, Georgios N.
2016-09-01
It is generally agreed that the governmental authorities should actively encourage the development of an efficient framework of information and communication technology initiatives so as to advance and promote sustainable development and planning strategies. This paper presents a prototype Information System for public administration which was designed to facilitate public management and decision making for sustainable development and planning. The system was developed by using several programming languages and programming tools and also a Database Management System (DBMS) for storing and managing urban data of many kinds. Furthermore, geographic information systems were incorporated into the system in order to make possible to the authorities to deal with issues of spatial nature such as spatial planning. The developed system provides a technology based management of geospatial information, environmental and crime data of urban environment aiming at improving public decision making and also at contributing to a more efficient sustainable development and planning.
Resource management plan for the Oak Ridge Reservation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parr, P.D.; Evans, J.W.
1992-06-01
A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.« less
Solid waste information and tracking system client-server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, D.L.
1998-04-15
This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less
Minimization In Digital Design As A Meta-Planning Problem
NASA Astrophysics Data System (ADS)
Ho, William P. C.; Wu, Jung-Gen
1987-05-01
In our model-based expert system for automatic digital system design, we formalize the design process into three sub-processes - compiling high-level behavioral specifications into primitive behavioral operations, grouping primitive operations into behavioral functions, and grouping functions into modules. Consideration of design minimization explicitly controls decision-making in the last two subprocesses. Design minimization, a key task in the automatic design of digital systems, is complicated by the high degree of interaction among the time sequence and content of design decisions. In this paper, we present an AI approach which directly addresses these interactions and their consequences by modeling the minimization prob-lem as a planning problem, and the management of design decision-making as a meta-planning problem.
Path planning and energy management of solar-powered unmanned ground vehicles
NASA Astrophysics Data System (ADS)
Kaplan, Adam
Many of the applications pertinent to unmanned vehicles, such as environmental research and analysis, communications, and information-surveillance and reconnaissance, benefit from prolonged vehicle operation time. Conventional efforts to increase the operational time of electric-powered unmanned vehicles have traditionally focused on the design of energy-efficient components and the identification of energy efficient search patterns, while little attention has been paid to the vehicle's mission-level path plan and power management. This thesis explores the formulation and generation of integrated motion-plans and power-schedules for solar-panel equipped mobile robots operating under strict energy constraints, which cannot be effectively addressed through conventional motion planning algorithms. Transit problems are considered to design time-optimal paths using both Balkcom-Mason and Pseudo-Dubins curves. Additionally, a more complicated problem to generate mission plans for vehicles which must persistently travel between certain locations, similar to the traveling salesperson problem (TSP), is presented. A comparison between one of the common motion-planning algorithms and experimental results of the prescribed algorithms, made possible by use of a test environment and mobile robot designed and developed specifically for this research, are presented and discussed.
Organisation of Management Development Programmes.
ERIC Educational Resources Information Center
Markwell, D. S.; Roberts, T. J.
The purpose of this book is to provide practical guidelines for planning and implementing management development activities. In Part 1 Markwell establishes the framework for designing and organizing management development programs. The section covers the following topics: Practical Starting-Point for Management Development, Establishing Management…
7 CFR 1948.59 - Ineligible activities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... Program § 1948.59 Ineligible activities. (a) Growth management and housing planning grant funds may not be... Governments;” (5) Planning for areas other than approved designated areas; (6) Planning other than growth...
Coal gasification systems engineering and analysis, volume 2
NASA Technical Reports Server (NTRS)
1980-01-01
The major design related features of each generic plant system were characterized in a catalog. Based on the catalog and requirements data, approximately 17 designs and cost estimates were developed for MBG and alternate products. A series of generic trade studies was conducted to support all of the design studies. A set of cost and programmatic analyses were conducted to supplement the designs. The cost methodology employed for the design and sensitivity studies was documented and implemented in a computer program. Plant design and construction schedules were developed for the K-T, Texaco, and B&W MBG plant designs. A generic work breakdown structure was prepared, based on the K-T design, to coincide with TVA's planned management approach. An extensive set of cost sensitivity analyses was completed for K-T, Texaco, and B&W design. Product price competitiveness was evaluated for MBG and the alternate products. A draft management policy and procedures manual was evaluated. A supporting technology development plan was developed to address high technology risk issues. The issues were identified and ranked in terms of importance and tractability, and a plan developed for obtaining data or developing technology required to mitigate the risk.
Decision support frameworks and tools for conservation
Schwartz, Mark W.; Cook, Carly N.; Pressey, Robert L.; Pullin, Andrew S.; Runge, Michael C.; Salafsky, Nick; Sutherland, William J.; Williamson, Matthew A.
2018-01-01
The practice of conservation occurs within complex socioecological systems fraught with challenges that require transparent, defensible, and often socially engaged project planning and management. Planning and decision support frameworks are designed to help conservation practitioners increase planning rigor, project accountability, stakeholder participation, transparency in decisions, and learning. We describe and contrast five common frameworks within the context of six fundamental questions (why, who, what, where, when, how) at each of three planning stages of adaptive management (project scoping, operational planning, learning). We demonstrate that decision support frameworks provide varied and extensive tools for conservation planning and management. However, using any framework in isolation risks diminishing potential benefits since no one framework covers the full spectrum of potential conservation planning and decision challenges. We describe two case studies that have effectively deployed tools from across conservation frameworks to improve conservation actions and outcomes. Attention to the critical questions for conservation project planning should allow practitioners to operate within any framework and adapt tools to suit their specific management context. We call on conservation researchers and practitioners to regularly use decision support tools as standard practice for framing both practice and research.
Developing Tribal Integrated Waste Management Plans
An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
Zhao, Linping; Patel, Pravin K; Cohen, Mimis
2012-07-01
Computer aided design and manufacturing (CAD/CAM) technology today is the standard in manufacturing industry. The application of the CAD/CAM technology, together with the emerging 3D medical images based virtual surgical planning (VSP) technology, to craniomaxillofacial reconstruction has been gaining increasing attention to reconstructive surgeons. This article illustrates the components, system and clinical management of the VSP and CAD/CAM technology including: data acquisition, virtual surgical and treatment planning, individual implant design and fabrication, and outcome assessment. It focuses primarily on the technical aspects of the VSP and CAD/CAM system to improve the predictability of the planning and outcome.
NASA Technical Reports Server (NTRS)
Laudeman, Irene V.; Brasil, Connie L.; Stassart, Philippe
1998-01-01
The Planview Graphical User Interface (PGUI) is the primary display of air traffic for the Conflict Prediction and Trial Planning, function of the Center TRACON Automation System. The PGUI displays air traffic information that assists the user in making decisions related to conflict detection, conflict resolution, and traffic flow management. The intent of this document is to outline the human factors issues related to the design of the conflict prediction and trial planning portions of the PGUI, document all human factors related design changes made to the PGUI from December 1996 to September 1997, and outline future plans for the ongoing PGUI design.
Adoption of Building Information Modelling in project planning risk management
NASA Astrophysics Data System (ADS)
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
Designing a Decision-Support System for Enrollment Management. AIR 1985 Annual Forum Paper.
ERIC Educational Resources Information Center
Glover, Robert H.
University of Hartford's decision-support system for enrollment management, which uses fourth-generation software tools, is described, with attention to the conceptual framework, design and implementation plan, and progress to date. The university's planners, institutional researchers, and admissions and financial aid officers are cooperating in…
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... purpose in developing this planning process is to give special attention to erosion issues. This special management attention may be achieved by designating erosion areas as areas of particular concern pursuant to...
2011-01-01
Objectives. To develop a relationship between a pharmacy management course and a mass merchandiser and to determine whether involving pharmacy managers from the mass merchandiser in the course would enhance student skills in developing a business plan for medication therapy management services. Design. The pharmacy managers from the mass merchandiser participated in lectures, provided panel discussions, and conducted a business plan competition. Learning was assessed by means of 4 examinations and 1 project (ie, the business plan). At the conclusion of the semester, surveys were administered to solicit student input and gain insight from pharmacy managers on the perceived value of this portion of the course. Assessment. Students’ average grade on the business plan assignment, which included the oral presentation, the peer assessment, and the written proposal, was 92.2%. Approximately 60% (n = 53) of surveyed students agreed or strongly agreed that their management skills had improved because of the participation of pharmacy managers from the mass merchandiser. All of the managers enjoyed participating in the experience. Conclusions. The involvement of pharmacy managers from a mass merchandiser enhanced student learning in the classroom, and managers felt that their participation was an important contribution to the development of future pharmacists. PMID:21969719
Hannan, M A; Abdulla Al Mamun, Md; Hussain, Aini; Basri, Hassan; Begum, R A
2015-09-01
In the backdrop of prompt advancement, information and communication technology (ICT) has become an inevitable part to plan and design of modern solid waste management (SWM) systems. This study presents a critical review of the existing ICTs and their usage in SWM systems to unfold the issues and challenges towards using integrated technologies based system. To plan, monitor, collect and manage solid waste, the ICTs are divided into four categories such as spatial technologies, identification technologies, data acquisition technologies and data communication technologies. The ICT based SWM systems classified in this paper are based on the first three technologies while the forth one is employed by almost every systems. This review may guide the reader about the basics of available ICTs and their application in SWM to facilitate the search for planning and design of a sustainable new system. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-12-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-02-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
Marketing and Distributive Education Curriculum Planning Guide.
ERIC Educational Resources Information Center
Northern Illinois Univ., DeKalb. Dept. of Business Education and Administration Services.
This planning guide in marketing and distributive education is designed to provide the curriculum coordinator and instructor with a basis for planning a comprehensive program in the career field of marketing. Such programs require competencies in sales, sales promotion, buying, transporting, storing, financing, marketing research, and management.…
Design of an ecological monitoring strategy for the Forest Plan in the Pacific Northwest
Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett
2003-01-01
The growing literature on ecosystem management describes an adaptive system in which monitoring measures progress toward goals, increases our knowledge, and improves our plans (e.g., Holling 1978; Walters 1986; Duffus III 1994; Everett et al. 1994; Grumbine 1994; Bormann et al. 1995; Gunderson et al. 1995; Interagency Ecosystem Management Task Force 1995; Montgomery et...
Storm Water Management Model (SWMM)
EPA's Storm Water Management Model (SWMM) is used throughout the world for planning, analysis and design related to stormwater runoff, combined and sanitary sewers, and other drainage systems in urban areas.
NASA Technical Reports Server (NTRS)
Cavanaugh, J.
1994-01-01
This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.
An Approach to Meeting Managements Needs for Financial Information
ERIC Educational Resources Information Center
Norberg, Douglas; Spilka, Leonard S.
1973-01-01
A discussion of the Automated Management Planning and Controls System (AMPACS) that is being designed for public television stations in order to provide much needed timely and complete information upon which management can base its decisions. (Author/HB)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-19
... (see, e.g., the PM 10 area designations in 40 CFR 81.305 for Coso Junction planning area, Owens Valley..., this action: Is not ``significant regulatory actions'' subject to review by the Office of Management..., 1999); Is not economically significant regulatory actions based on health or safety risks subject to...
Design and Implementation of Collaborative Research Approaches
NASA Technical Reports Server (NTRS)
Venti, Mike W.; Berger, David E.
2009-01-01
This poster reviews the collarborative research approaches that NASA has been designing and implementing for the Integrated Vehicle Health Management (IVHM) Project. The inputs for the technical plan are reviewed, the Research Test and Integration Plan (RTIP) WIKI, is used to create and propose a multi-themed and multi-partner research testing opportunities. The outputs are testing opportunities.
Career Survival: Strategic Job and Role Planning. Pfeiffer Career Series.
ERIC Educational Resources Information Center
Schein, Edgar H.
This book was designed to help managers and employees to decipher the two crucial elements in work design and human resource planning: the role network that surrounds every position and the key stakeholders whose expectations define the essence of the job. It provides a structured process for analyzing one's own job as well as the jobs of…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-03
... allows certain uses (including grazing, measures to control fire, insects and disease) to continue in... designation as Wild, Scenic, or Recreational under the Wild and Scenic Rivers Act? What Visual Resource... emergency or fire access; Designating all public lands within the planning area as open, limited, or closed...
NASA Technical Reports Server (NTRS)
Simon, Tom
2009-01-01
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
Optimizing diabetes management: managed care strategies.
Tzeel, E Albert
2013-06-01
Both the prevalence of type 2 diabetes mellitus (DM) and its associated costs have been rising over time and are projected to continue to escalate. Therefore, type 2 DM (T2DM) management costs represent a potentially untenable strain on the healthcare system unless substantial, systemic changes are made. Managed care organizations (MCOs) are uniquely positioned to attempt to make the changes necessary to reduce the burdens associated with T2DM by developing policies that align with evidence-based DM management guidelines and other resources. For example, MCOs can encourage members to implement healthy lifestyle choices, which have been shown to reduce DM-associated mortality and delay comorbidities. In addition, MCOs are exploring the strengths and weaknesses of several different benefit plan designs. Value-based insurance designs, sometimes referred to as value-based benefit designs, use both direct and indirect data to invest in incentives that change behaviors through health information technologies, communications, and services to improve health, productivity, quality, and financial trends. Provider incentive programs, sometimes referred to as "pay for performance," represent a payment/delivery paradigm that places emphasis on rewarding value instead of volume to align financial incentives and quality of care. Accountable care organizations emphasize an alignment between reimbursement and implementation of best practices through the use of disease management and/ or clinical pathways and health information technologies. Consumer-directed health plans, or high-deductible health plans, combine lower premiums with high annual deductibles to encourage members to seek better value for health expenditures. Studies conducted to date on these different designs have produced mixed results.
ERIC Educational Resources Information Center
Rothwell, William J.; Cookson, Peter S.
This book introduces key issues in program planning as practiced in business and educational settings. Two chapters in part 1 introduce two foundational models--Lifelong Education Program Planning (LEPP) model and Contingency-Based Program Planning--and provide background on models designed by Houle, Knowles, Boyle, and Nadler. Parts 2-5 focus on…
How to inject consumerism into your existing health plans.
Havlin, Linda J; McAllister, Michael F; Slavney, David H
2003-09-01
Consumerism seeks to create a behavior change on the part of consumers so that they become accountable, knowledgeable and actively engaged in managing their health. It can be used in any existing health plan through targeted plan design changes and consumer education efforts. Employers have many options in addition to consumer-directed health plans (CDHPs).
On the role of model-based monitoring for adaptive planning under uncertainty
NASA Astrophysics Data System (ADS)
Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn
2016-04-01
Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory, triggered by the challenge of uncertainty in operational control, may offer solutions from which monitoring for adaptive planning can benefit. Specifically: (i) in control, observations are incorporated into the model through data assimilation, updating the present state, boundary conditions, and parameters based on new observations, diminishing the shadow of the past; (ii) adaptive control is a way to modify the characteristics of the internal model, incorporating new knowledge on the system, countervailing the inhibition of learning; and (iii) in closed-loop control, a continuous system update equips the controller with "inherent robustness", i.e. to capacity to adapts to new conditions even when these were not initially considered. We aim to explore how inherent robustness addresses the challenge of surprise. Innovations in model-based control might help to improve and adapt the models used to support adaptive delta management to new information (reducing uncertainty). Moreover, this would offer a starting point for using these models not only in the design of adaptive plans, but also as part of the monitoring. The proposed research requires multidisciplinary cooperation between control theory, the policy sciences, and integrated assessment modeling.
NASA Technical Reports Server (NTRS)
Knox, C. E.
1983-01-01
A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight tests flown with a T-39A (Sabreliner) airplane are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vicroy, D.D.; Knox, C.E.
A simplified flight management descent algorithm was developed and programmed on a small programmable calculator. It was designed to aid the pilot in planning and executing a fuel conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight management descent algorithm and the vertical performance modelingmore » required for the DC-10 airplane is described.« less
Conceptual design of an orbital propellant transfer experiment. Volume 2: Study results
NASA Technical Reports Server (NTRS)
Drake, G. L.; Bassett, C. E.; Merino, F.; Siden, L. E.; Bradley, R. E.; Carr, E. J.; Parker, R. E.
1980-01-01
The OTV configurations, operations and requirements planned for the period from the 1980's to the 1990's were reviewed and a propellant transfer experiment was designed that would support the needs of these advanced OTV operational concepts. An overall integrated propellant management technology plan for all NASA centers was developed. The preliminary cost estimate (for planning purposes only) is $56.7 M, of which approximately $31.8 M is for shuttle user costs.
Ferguson, Cliff
2018-01-01
Within South Africa, few public service departments understand the concepts of business continuity management (BCM) and what it takes to implement a well-constructed business continuity plan. Likewise, few of these entities understand the purpose of designing and maintaining resilient systems that are immune to incidents. This paper discusses the integration of the South African Disaster Management Act 2002, the Disaster Management Framework and the National Development Plan, linking these to BCM, through a resilience period model, as a means for the implementation of resilience strategies. The goals of the National Development Plan are outlined with a view to how resilience can be achieved in each. A resilience period model has been advocated for the implementation of projects within the public sector in order to provide continuity and sustainability.
ERIC Educational Resources Information Center
Farmer, D. W.
1983-01-01
An effective collegial and relatively noncompetitive approach to integrated planning developed at King's College is discussed. The development of a structured system of intensive oral communication; an organizational design integrating planning, budgeting, marketing, and evaluation, and a modified matrix management system are described. (MLW)
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
34 CFR 606.10 - What activities may and may not be carried out under a grant?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., and student service programs designed to improve academic success. (6) Funds management... development courses. (6) Developing or improving community-based or community services programs, unless the...) Planning grants. Under a planning grant, a grantee shall formulate— (1) A comprehensive development plan...
Li, Qing-na; Huang, Xiu-ling; Gao, Rui; Lu, Fang
2012-08-01
Data management has significant impact on the quality control of clinical studies. Every clinical study should have a data management plan to provide overall work instructions and ensure that all of these tasks are completed according to the Good Clinical Data Management Practice (GCDMP). Meanwhile, the data management plan (DMP) is an auditable document requested by regulatory inspectors and must be written in a manner that is realistic and of high quality. The significance of DMP, the minimum standards and the best practices provided by GCDMP, the main contents of DMP based on electronic data capture (EDC) and some key factors of DMP influencing the quality of clinical study were elaborated in this paper. Specifically, DMP generally consists of 15 parts, namely, the approval page, the protocol summary, role and training, timelines, database design, creation, maintenance and security, data entry, data validation, quality control and quality assurance, the management of external data, serious adverse event data reconciliation, coding, database lock, data management reports, the communication plan and the abbreviated terms. Among them, the following three parts are regarded as the key factors: designing a standardized database of the clinical study, entering data in time and cleansing data efficiently. In the last part of this article, the authors also analyzed the problems in clinical research of traditional Chinese medicine using the EDC system and put forward some suggestions for improvement.
25 CFR 700.722 - Grazing associations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... range unit livestock associations in the management of livestock and range resources. (b) These... management plans, (3) To express their wishes through designated officers or committees, (4) To share costs... rules needed to assure cooperation and resource management. (c) The requirements for receiving...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-13
... DEPARTMENT OF THE INTERIOR Bureau of Land Management Notice of Intent To Prepare an Environmental Impact Statement for the Restoration Design Energy Project and Possible Land Use Plan Amendment AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: In compliance with the National...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... Project (RDEP) Record of Decision (ROD)/approved Resource Management Plan (RMP) amendments for BLM... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZ910000.L13400000.DT0000.LXSS058A0000] Notice of Availability of the Restoration Design Energy Project Record of Decision/Approved Resource...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... export of goods and services for the design and construction of an aquarium. Brief non-proprietary... industry. Parties: Principal Supplier: International Concept Management. Obligor: State of Cear[aacute... Planning, Budget and Management. Description of Items Being Exported: Design, engineering and construction...
Report of the First National Conference on PPBES in Education, June 10, 1969.
ERIC Educational Resources Information Center
Foster, Charles W., Ed.
This document contains proceedings of a conference that presented a design for applying a program planning-budgeting-evaluating system (PPBES) to educational management. Included are (1) the keynote address, tracing the origin and future of program budgeting; (2) the presentation of the educational management design developed by the Research…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZ910000.L14300000.DB0000.LXSS058A0000] Notice of Availability of the Draft Environmental Impact Statement for the Restoration Design Energy Project and Land Use Plan Amendments AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...
Operational modes, health, and status monitoring
NASA Astrophysics Data System (ADS)
Taljaard, Corrie
2016-08-01
System Engineers must fully understand the system, its support system and operational environment to optimise the design. Operations and Support Managers must also identify the correct metrics to measure the performance and to manage the operations and support organisation. Reliability Engineering and Support Analysis provide methods to design a Support System and to optimise the Availability of a complex system. Availability modelling and Failure Analysis during the design is intended to influence the design and to develop an optimum maintenance plan for a system. The remote site locations of the SKA Telescopes place emphasis on availability, failure identification and fault isolation. This paper discusses the use of Failure Analysis and a Support Database to design a Support and Maintenance plan for the SKA Telescopes. It also describes the use of modelling to develop an availability dashboard and performance metrics.
NASA Technical Reports Server (NTRS)
Connelly, L. C.
1977-01-01
The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.
1995-03-01
This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance.more » Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.« less
Barriers to the implementation of self management support in long term lung conditions
Roberts, NJ; Younis, I; Kidd, L
2012-01-01
Background Self-management improves outcomes in asthma and COPD and is strongly recommended in national and international guidelines; however implementation of the guidelines such as use of written action plans in practice is often poor. Setting A questionnaire survey was undertaken to identify the healthcare professional barriers to implementation of self-management for asthma and COPD in West London. Question Why is self-management education not being undertaken in respiratory conditions? Methods A questionnaire was designed to elicit healthcare professionals' views about barriers to implementation of self-management in asthma and COPD. Results Response rates were 33% (58/175). Results showed strong support for guideline recommendations, however implementation was patchy. Seventy six percent of respondents discussed asthma self-management with patients; however only 47.8% of patients received a written action plan. For COPD patients, 55.1% discussed self-management, with 41% receiving a written action plan. In COPD, there was greater GP involvement and less delegation of self-management. Barriers to implementation included patient factors (compliance, literacy and patient understanding), time constraints and insufficient resources. Those who believed they had witnessed improved health outcomes with self-management (53%, 31/58) were more likely to give written action plans (78%, 24/31, ‘nearly always/sometimes’ gave written action plans), Nearly a third of healthcare professionals reported lacking confidence in constructing written action plans (33% 19/58; GPs 43%, nurses 43%). Conclusion Despite overwhelming evidence self-management support is still not being implemented into routine clinical practice, identified barriers included time constraints, lack of training, lack of belief in patients ability to self-manage and lack of confidence completing self-management plans. Practice implications These issues need to be addressed if self-management support is to be delivered in a meaningful and effective way. PMID:25949665
Planning and management of the Nido Reef Complex Oil Field development, Philippines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harry, R.Y.
1981-01-01
As Operator for the Northeast Palawan consortium, Philippines-Cities Service, Inc., commenced the Philippines first commercial offshore oil production from the Nido Reef Complex Oil Field on February 1, 1979, some 11 months after a decision by management to start development. The relative speed at which design, fabrication, and construction were accomplished is attributed to the use of the concepts of project planning, task force approach, and project management. This paper presents the above concepts as applied to the Nido Complex.
Region 4 ATMS local evaluation report
DOT National Transportation Integrated Search
2005-07-01
In March, 1996, the Rochester Areawide Advanced Transportation Management System Report (6) established the need for an ITS as well as a strategic implementation/deployment plan. This plan has, in part, been implemented through the design and constru...
40 CFR 62.14575 - What must I do if I close my CISWI unit and then restart it?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration... necessary process changes and air pollution control devices operate as designed. Waste Management Plan ...
Corrosion Prevention and Control Planning Guidebook Spiral 3
2007-09-01
programs. 5. Develop and recommend corrective and preventive procedures based on reliability and maintainability analyses of field data on similar in...One of the many challenges facing the Program/Acquisition Managers is the ability to develop a meaningful Corrosion Prevention and Control Plan...designated program manager of all activities associated with the acquisition, development , production, fielding , sustainment, and disposal of a DoD weapon
Clinical Effectiveness Research in Managed-care Systems: Lessons from the Pediatric Asthma Care PORT
Finkelstein, Jonathan A; Lozano, Paula; Streiff, Kachen A; Arduino, Kelly E; Sisk, Cynthia A; Wagner, Edward H; Weiss, Kevin B; Inui, Thomas S
2002-01-01
Objective To highlight the unique challenges of evaluative research on practice behavior change in the “real world” settings of contemporary managed-care organizations, using the experience of the Pediatric Asthma Care PORT (Patient Outcomes Research Team). Study Setting The Pediatric Asthma Care PORT is a five-year initiative funded by the Agency for Healthcare Research and Quality to study strategies for asthma care improvement in three managed-care plans in Chicago, Seattle, and Boston. At its core is a randomized trial of two care improvement strategies compared with usual care: (1) a targeted physician education program using practice based Peer Leaders (PL) as change agents, (2) adding to the PL intervention a “Planned Asthma Care Intervention” incorporating joint “asthma check-ups” by nurse-physician teams. During the trial, each of the participating organizations viewed asthma care improvement as an immediate priority and had their own corporate improvement programs underway. Data Collection Investigators at each health plan described the organizational and implementation challenges in conducting the PAC PORT randomized trial. These experiences were reviewed for common themes and “lessons” that might be useful to investigators planning interventional research in similar care-delivery settings. Conclusions Randomized trials in “real world” settings represent the most robust design available to test care improvement strategies. In complex, rapidly changing managed-care organizations, blinding is not feasible, corporate initiatives may complicate implementation, and the assumption that a “usual care” arm will be static is highly likely to be mistaken. Investigators must be prepared to use innovative strategies to maintain the integrity of the study design, including: continuous improvement within the intervention arms, comanagement by researchers and health plan managers of condition-related quality improvement initiatives, procedures for avoiding respondent burden in health plan enrollees, and anticipation and minimization of risks from experimental arm contamination and major organizational change. With attention to these delivery system issues, as well as the usual design features of randomized trials, we believe managed-care organizations can serve as important laboratories to test care improvement strategies. PMID:12132605
Ridgely, M Susan; Giard, Julienne; Shern, David; Mulkern, Virginia; Burnam, M Audrey
2002-01-01
Objective To develop an instrument to characterize public sector managed behavioral health care arrangements to capture key differences between managed and “unmanaged” care and among managed care arrangements. Study Design The instrument was developed by a multi-institutional group of collaborators with participation of an expert panel. Included are six domains predicted to have an impact on access, service utilization, costs, and quality. The domains are: characteristics of the managed care plan, enrolled population, benefit design, payment and risk arrangements, composition of provider networks, and accountability. Data are collected at three levels: managed care organization, subcontractor, and network of service providers. Data Collection Methods Data are collected through contract abstraction and key informant interviews. A multilevel coding scheme is used to organize the data into a matrix along key domains, which is then reviewed and verified by the key informants. Principal Findings This instrument can usefully differentiate between and among Medicaid fee-for-service programs and Medicaid managed care plans along key domains of interest. Beyond documenting basic features of the plans and providing contextual information, these data will support the refinement and testing of hypotheses about the impact of public sector managed care on access, quality, costs, and outcomes of care. Conclusions If managed behavioral health care research is to advance beyond simple case study comparisons, a well-conceptualized set of instruments is necessary. PMID:12236386
7 CFR 25.401 - Responsibility of lead managing entity.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 1 2013-01-01 2013-01-01 false Responsibility of lead managing entity. 25.401 Section... COMMUNITIES Post-Designation Requirements § 25.401 Responsibility of lead managing entity. (a) Financial. The lead managing entity will be responsible for strategic plan program activities and monitoring the...
7 CFR 25.401 - Responsibility of lead managing entity.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 1 2012-01-01 2012-01-01 false Responsibility of lead managing entity. 25.401 Section... COMMUNITIES Post-Designation Requirements § 25.401 Responsibility of lead managing entity. (a) Financial. The lead managing entity will be responsible for strategic plan program activities and monitoring the...
7 CFR 25.401 - Responsibility of lead managing entity.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 1 2014-01-01 2014-01-01 false Responsibility of lead managing entity. 25.401 Section... COMMUNITIES Post-Designation Requirements § 25.401 Responsibility of lead managing entity. (a) Financial. The lead managing entity will be responsible for strategic plan program activities and monitoring the...
Knowledge Management ERP Curriculum Design/Mapping (Theory and Development Tools)
ERIC Educational Resources Information Center
Swanson, Zane; Hepner, Michelle
2011-01-01
This study proposes a knowledge management framework for developing and managing enterprise resource planning (ERP) curriculum within business schools. Both theory and a practical implementation are addressed. The knowledge management (KM) framework has two components which utilize ERP from a big picture curriculum overview and a ground level…
ERIC Educational Resources Information Center
Cripe, Dennis
1998-01-01
Considers two very different fictional high school newspaper editorships to see how the "maestro" process works. Notes that the process is a management technique similar to brainstorming but in which one person keeps the planning meeting focused. Suggests that the effective maestro asks writers, photographers, and designers to trade places with…
An aquatic multiscale assessment and planning framework approach—forest plan revision case study
Kerry Overton; Ann D. Carlson; Cynthia Tait
2010-01-01
The Aquatic Multiscale Assessment and Planning Framework is a Web-based decision-support tool developed to assist aquatic practitioners in managing fisheries and watershed information. This tool, or framework, was designed to assist resource assessments and planning efforts from the broad scale to the fine scale, to document procedures, and to link directly to relevant...
Corporate buying of health care plans: a framework for marketing theory and practice.
Lindenmuth, L J; Burger, P C
1990-06-01
Much of the research in health care plan and provider selection has focused on the patient's selection process. The authors report on the increasing need to understand the corporation's decision process in selecting health care plans and providers. Managed care marketers need to understand this process in order to design and market such plans successfully.
Adaptation Design Tool for Climate-Smart Management of Coral Reefs and Other Natural Resources.
West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Gibbs, David A; Bradley, Patricia; Julius, Susan H
2018-06-22
Scientists and managers of natural resources have recognized an urgent need for improved methods and tools to enable effective adaptation of management measures in the face of climate change. This paper presents an Adaptation Design Tool that uses a structured approach to break down an otherwise overwhelming and complex process into tractable steps. The tool contains worksheets that guide users through a series of design considerations for adapting their planned management actions to be more climate-smart given changing environmental stressors. Also provided with other worksheets is a framework for brainstorming new adaptation options in response to climate threats not yet addressed in the current plan. Developed and tested in collaboration with practitioners in Hawai'i and Puerto Rico using coral reefs as a pilot ecosystem, the tool and associated reference materials consist of worksheets, instructions and lessons-learned from real-world examples. On the basis of stakeholder feedback from expert consultations during tool development, we present insights and recommendations regarding how to maximize tool efficiency, gain the greatest value from the thought process, and deal with issues of scale and uncertainty. We conclude by reflecting on how the tool advances the theory and practice of assessment and decision-making science, informs higher level strategic planning, and serves as a platform for a systematic, transparent and inclusive process to tackle the practical implications of climate change for management of natural resources.
7 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Environmental Protection Agency (EPA) will— (1) Approve 208 water quality management plans, (2) Participate in... enter into contracts to install and maintain best management practices to control agricultural nonpoint... Secretary may designate, (3) Provide technical assistance and share the cost of carrying out best management...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.1 Purpose. This part implements section 324... receiving assistance from the agency. First, subpart B discusses project management oversight, designed..., subpart C discusses the project management plan (PMP) required of all major capital projects. The PMP is...
45 CFR 1304.51 - Management systems and procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... control program quality, maintain program accountability, and advise governing bodies, policy groups, and... DELEGATE AGENCIES Program Design and Management § 1304.51 Management systems and procedures. (a) Program... program planning that includes consultation with the program's governing body, policy groups, and program...
Code of Federal Regulations, 2012 CFR
2012-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.1 Purpose. This part implements section 324... receiving assistance from the agency. First, subpart B discusses project management oversight, designed..., subpart C discusses the project management plan (PMP) required of all major capital projects. The PMP is...
Code of Federal Regulations, 2011 CFR
2011-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.1 Purpose. This part implements section 324... receiving assistance from the agency. First, subpart B discusses project management oversight, designed..., subpart C discusses the project management plan (PMP) required of all major capital projects. The PMP is...
Code of Federal Regulations, 2013 CFR
2013-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.1 Purpose. This part implements section 324... receiving assistance from the agency. First, subpart B discusses project management oversight, designed..., subpart C discusses the project management plan (PMP) required of all major capital projects. The PMP is...
Code of Federal Regulations, 2014 CFR
2014-10-01
... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.1 Purpose. This part implements section 324... receiving assistance from the agency. First, subpart B discusses project management oversight, designed..., subpart C discusses the project management plan (PMP) required of all major capital projects. The PMP is...
76 FR 14375 - United States Integrated Ocean Observing System Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... coastal resources; and public safety. The System is also designed to promote research to develop, test...; coastal management; fisheries management; coastal and marine spatial planning; geodesy; water levels; and...
Integral stormwater management master plan and design in an ecological community.
Che, Wu; Zhao, Yang; Yang, Zheng; Li, Junqi; Shi, Man
2014-09-01
Urban stormwater runoff nearly discharges directly into bodies of water through gray infrastructure in China, such as sewers, impermeable ditches, and pump stations. As urban flooding, water shortage, and other environment problems become serious, integrated water environment management is becoming increasingly complex and challenging. At more than 200ha, the Oriental Sun City community is a large retirement community located in the eastern side of Beijing. During the beginning of its construction, the project faced a series of serious water environment crises such as eutrophication, flood risk, water shortage, and high maintenance costs. To address these issues, an integral stormwater management master plan was developed based on the concept of low impact development (LID). A large number of LID and green stormwater infrastructure (GSI) approaches were designed and applied in the community to replace traditional stormwater drainage systems completely. These approaches mainly included bioretention (which captured nearly 85th percentile volume of the annual runoff in the site, nearly 5.4×10(5)m(3) annually), swales (which functioned as a substitute for traditional stormwater pipes), waterscapes, and stormwater wetlands. Finally, a stormwater system plan was proposed by integrating with the gray water system, landscape planning, an architectural master plan, and related consultations that supported the entire construction period. After more than 10 years of planning, designing, construction, and operation, Oriental Sun City has become one of the earliest modern large-scale LID communities in China. Moreover, the project not only addressed the crisis efficiently and effectively, but also yielded economic and ecological benefits. Copyright © 2014. Published by Elsevier B.V.
NASA Astrophysics Data System (ADS)
Brown, C.; Ray, P. A.; Freeman, S.
2016-12-01
Societal need for improved water management and concerns for the long-term sustainability of water resources systems are prominent around the world. The continued susceptibility of society to the harmful effects of hydrologic variability, pervasive concerns related to climate change and the emergent awareness of devastating effects of current practice on aquatic ecosystems all illustrate our limited understanding of how water ought to be managed in a dynamic world. To address these challenges, new problem solving approaches are required that acknowledge uncertainties, incorporate best available information, and link engineering design principles, typically based on determinism, with our best geoscience-based understanding of planetary change. In this presentation, we present and demonstrate a framework for developing water planning and management strategies that are resilient in the face of future uncertainties and our limited ability to anticipate the future. The approach begins with stakeholder engagement and decision framing to elicit relevant context, uncertainties, choices and connections that drive planning and serve as an entry point to exploring possible futures. The result is the development of water strategies that are informed by the best available predictive information and designed to perform well over a future of change. Examples from around the world are presented to illustrate the methodology.
Education for All: National Plan of Action, 2003-2015
ERIC Educational Resources Information Center
Online Submission, 2005
2005-01-01
Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…
Inorganic Analysis in Water Quality Control Programs. Instructor's Guide.
ERIC Educational Resources Information Center
Kroner, Audrey
This two-part instructor's guide was designed for a five-day course for chemists and technicians with little or no experience in inorganic analyses. Part I provides information on course planning and management including course description, staff responsibilities, suggested course plan and agenda, timeline for planning and conducting the course,…
Human Resource Planning: An Introduction. Report 312.
ERIC Educational Resources Information Center
Reilly, Peter
This report is designed to give readers an introduction to the principles of human resource planning (HRP) and the areas in which it can be used, including those facing today's managers. Chapter 1 outlines why some organizations no longer plan, describes the background of change and uncertainty that discouraged them, and defines HRP. Chapter 2…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A20-0805-4999-400-00-0-0-2, 2100000] Resource... Reservoir State Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION... Parks and Recreation was given the responsibility to plan, design, construct, maintain, and operate the...
Planning crops and developing propagation protocols [Chapter 3
Douglass F. Jacobs; Kim M. Wilkinson
2009-01-01
Crop planning is an important but often neglected aspect of successful nursery management. Crop planning enables proper scheduling of the necessary time, materials, labor, and space to produce crops. Many painstaking details, such as the careful design of nursery facilities; working with clients; collecting and propagating seeds and cuttings; and making improvements in...
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
Washington State Community College Capital Master Plan, 1985-91. Management Summary.
ERIC Educational Resources Information Center
Washington State Board for Community Coll. Education, Olympia.
Designed for Washington State's decision makers and the trustees and administrators of the community college system, this report extracts information from the community college system's 1985-87 capital budget request and 1985-91 capital master plan to provide a brief description of the budget and plan. Introductory material discusses the…
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
40 CFR 49.154 - Permit application requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...
Research needs in transportation planning and management.
DOT National Transportation Integrated Search
1977-01-01
In 1974, legislation enacted by the General Assembly to expand the responsibilities and duties of the former Virginia Department of Highways, with the main new assignment being in the area of planning. The agency was now designated the Virginia Depar...
ERIC Educational Resources Information Center
Hassell, Kim Dale
2000-01-01
Discusses the common mistakes in school design and construction and how to avoid them. Mistake avoidance in mastering planning, site acquisition, drawing changes, budgeting, school design process, construction management, and the architect's role are highlighted. (GR)
Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan
NASA Technical Reports Server (NTRS)
1972-01-01
A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knox, C.E.
A simplified flight-management descent algorithm, programmed on a small programmable calculator, was developed and flight tested. It was designed to aid the pilot in planning and executing a fuel-conservative descent to arrive at a metering fix at a time designated by the air traffic control system. The algorithm may also be used for planning fuel-conservative descents when time is not a consideration. The descent path was calculated for a constant Mach/airspeed schedule from linear approximations of airplane performance with considerations given for gross weight, wind, and nonstandard temperature effects. The flight-management descent algorithm is described. The results of flight testsmore » flown with a T-39A (Sabreliner) airplane are presented.« less
NASA Technical Reports Server (NTRS)
Hunsucker, J. L.
1993-01-01
The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.
[A medical consumable material management information system].
Tang, Guoping; Hu, Liang
2014-05-01
Medical consumables material is essential supplies to carry out medical work, which has a wide range of varieties and a large amount of usage. How to manage it feasibly and efficiently that has been a topic of concern to everyone. This article discussed about how to design a medical consumable material management information system that has a set of standardized processes, bring together medical supplies administrator, suppliers and clinical departments. Advanced management mode, enterprise resource planning (ERP) applied to the whole system design process.
What You Always Wanted to Know About Monitoring Naval Ship Construction but You Did Not Dare Ask.
1990-06-01
CONCEPTUAL DESIGN For the conceptual design of the management efforts, we quote the Principles of Management , as they were presented by Fayol (Ret. l:p...functional groups. The five basic principles of management theory are: Planning, Organizing, Staffing, Directing, and Controlling. These principles... Principles of Management , McGraw-Hill, 1978. 16. ibid. 70 17. ibid. 18. ibid. 19. ibid. 20. Wolfe, P.M., Cochran E.B., and Thompson, W.J., A BERTS- Based
Development of a Mixed Scanning Interactive System for Decision Support.
1984-07-01
strategic planning, management control , and i I gineering design of information systems for planning and deci- operational control . The method-of-evidence...Nvstrom 13351 _ . "The functional equivalence of prohlem soiing skills." and W I. Starbuck. Eds.. llandhoot of Or’ani:ational Design . (’,gnitite P’ iihol...concerns make design means do we necessarily learn well from ex- and application of the aforementioned adju- perience [10]. vants a non routine task
Development of a nurse case management service: a proposed business plan for rural hospitals.
Adams, Marsha Howell; Crow, Carolyn S
2005-01-01
The nurse case management service (NCMS) for rural hospitals is an entrepreneurial endeavor designed to provide rural patients with quality, cost-effective healthcare. This article describes the development of an NCMS. A detailed marketing and financial plan, a review of industry trends, and the legal structure and risks associated with the development of the venture are presented. The financial plan projects a minimum savings of 223,200 dollars for rural institutions annually. To improve quality and reduce cost for rural hospitals, the authors recommend implementation of an NCMS.
Chapter 2 - An overview of the LANDFIRE Prototype Project
Matthew G. Rollins; Robert E. Keane; Zhiliang Zhu; James P. Menakis
2006-01-01
This chapter describes the background and design of the Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, which was a sub-regional, proof-of-concept effort designed to develop methods and applications for providing the high-resolution data (30-m pixel) needed to support wildland fire management and to implement the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-01
... to increase due to the designation, and whether that increase in threat outweighs the benefit of... information on any impacts on small entities or families, and the benefits of including or excluding areas... natural resources management plan for the Fort currently benefits the jaguar, whether or not management...
ERIC Educational Resources Information Center
Doyle, Walter; And Others
This report describes the conceptual background, design, and methodology for a study of management of academic tasks in junior high school. Previous research suggests that tasks students accomplish in classrooms determine what they actually learn, and acquisition of higher cognitive skills related to interpretation and planning is essential for…
NASA Astrophysics Data System (ADS)
Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea
2017-04-01
Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of different operating strategies.
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL... high quality research within designated National Estuarine Research Reserves, NOAA may provide... with approved final management plans. Although research may be conducted within the immediate watershed...
Maximize Energy Efficiency in Buildings | Climate Neutral Research Campuses
Buildings on a research campus, especially laboratory buildings, often represent the most cost-effective plans, campuses can evaluate the following: Energy Management Building Management New Buildings Design
Coastal Stormwater Management Through Green Infrastructure Handbook for Municipalities
This handbook is designed to assist municipalities within the Massachusetts Bay and Cape Cod Bay areas to incorporate green infrastructure into their stormwater management planning. It can also be readily applied to other states.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT NATIONAL... high quality research within designated National Estuarine Research Reserves, NOAA may provide... with approved final management plans. Although research may be conducted within the immediate watershed...
NASA Technical Reports Server (NTRS)
Rado, B. Q.
1975-01-01
Automatic classification techniques are described in relation to future information and natural resource planning systems with emphasis on application to Georgia resource management problems. The concept, design, and purpose of Georgia's statewide Resource AS Assessment Program is reviewed along with participation in a workshop at the Earth Resources Laboratory. Potential areas of application discussed include: agriculture, forestry, water resources, environmental planning, and geology.
Integrated management of timber and deer: coastal forests of British Columbia and Alaska.
J.B. Nyberg; R.S. McNay; M.D. [and others] Kirchhoff
1989-01-01
Current techniques for integrating timber and deer management in coastal British Columbia and Alaska are reviewed and evaluated. Integration can be improved by setting objectives for deer habitat and timber, improving managers' knowledge of interactions, and providing planning tools to analyze alternative programs of forest management. A handbook designed to...
Pattern-based information portal for business plan co-creation
NASA Astrophysics Data System (ADS)
Bontchev, Boyan; Ruskov, Petko; Tanev, Stoyan
2011-03-01
Creation of business plans helps entrepreneurs in managing identification of business opportunities and committing necessary resources for process evolution. Applying patterns in business plan creation facilitates the identification of effective solutions that were adopted in the past and may provide a basis for adopting similar solutions in the future within given business context. The article presents the system design of an information portal for business plan co-creation based on patterns. The portal is going to provide start-up and entrepreneurs with ready-to-modify business plan patterns in order to help them in development of effective and efficient business plans. It will facilitate entrepreneurs in co-experimenting and co-learning more frequently and faster. Moreover, the paper focuses on the software architecture of the pattern based portal and explains the functionality of its modules, namely the pattern designer, pattern repository services and agent-based pattern implementers. It explains their role for business process co-creation, storing and managing patterns described formally, and selecting patterns best suited for specific business case. Thus, innovative entrepreneurs will be guided by the portal in co-writing winning business plans and staying competitive in the present day dynamic globalized environment.
Pattern-based information portal for business plan co-creation
NASA Astrophysics Data System (ADS)
Bontchev, Boyan; Ruskov, Petko; Tanev, Stoyan
2010-10-01
Creation of business plans helps entrepreneurs in managing identification of business opportunities and committing necessary resources for process evolution. Applying patterns in business plan creation facilitates the identification of effective solutions that were adopted in the past and may provide a basis for adopting similar solutions in the future within given business context. The article presents the system design of an information portal for business plan co-creation based on patterns. The portal is going to provide start-up and entrepreneurs with ready-to-modify business plan patterns in order to help them in development of effective and efficient business plans. It will facilitate entrepreneurs in co-experimenting and co-learning more frequently and faster. Moreover, the paper focuses on the software architecture of the pattern based portal and explains the functionality of its modules, namely the pattern designer, pattern repository services and agent-based pattern implementers. It explains their role for business process co-creation, storing and managing patterns described formally, and selecting patterns best suited for specific business case. Thus, innovative entrepreneurs will be guided by the portal in co-writing winning business plans and staying competitive in the present day dynamic globalized environment.
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... State priority system and list must be designed to achieve optimum water quality management consistent... water quality management (WQM) plans. The State shall hold a public hearing before submission of the... also sets forth the administrative, management, and public participation procedures required to develop...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2010 CFR
2010-10-01
... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information... the requirements under these regulations. (c) If ACF finds that any statewide management information...
Effective Strategic Planning for Community Colleges Founded upon Transformational Management Theory
ERIC Educational Resources Information Center
Joseph, Oscar, III
2013-01-01
The transformational management philosophy creates a culture that has purpose, moral standards, and high achievement outcomes (Yukl, 2006). The primary focus of transformational management theory is to be humane, while exhibiting behavioral characteristics of kindness, care, compassion, and principled centeredness (ethical disposition) designed to…
Personnel Management: Two Year Colleges.
ERIC Educational Resources Information Center
Ohio Board of Regents, Columbus. Management Improvement Program.
This document is one of five manuals designed to improve management practices in Ohio two-year colleges. A chapter on organizing for personnel management discusses basic personnel functions, roles and responsibilities of administrators, and the need for a central statewide office of personnel affairs. A chapter on planning, policies, and…
Prepare to protect: Operating and maintaining a tornado safe room.
Herseth, Andrew; Goldsmith-Grinspoon, Jennifer; Scott, Pataya
2017-06-01
Operating and maintaining a tornado safe room can be critical to the effective continuity of business operations because a firm's most valuable asset is its people. This paper describes aspects of operations and maintenance (O&M) for existing tornado safe rooms as well as a few planning and design aspects that affect the ultimate operation of a safe room for situations where a safe room is planned, but not yet constructed. The information is based on several Federal Emergency Management Agency safe room publications that provide guidance on emergency management and operations, as well as the design and construction of tornado safe rooms.
Computer-aided software development process design
NASA Technical Reports Server (NTRS)
Lin, Chi Y.; Levary, Reuven R.
1989-01-01
The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.
Application of JLab 12GeV helium refrigeration system for the FRIB accelerator at MSU
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ganni, Venkatarao; Knudsen, Peter N.; Arenius, Dana M.
The planned approach to have a turnkey helium refrigeration system for the MSU-FRIB accelerator system, encompassing the design, fabrication, installation and commissioning of the 4.5-K refrigerator cold box(es), cold compression system, warm compression system, gas management, oil removal and utility/ancillary systems, was found to be cost prohibitive. Following JLab’s suggestion, MSU-FRIB accelerator management made a formal request to evaluate the applicability of the recently designed 12GeV JLab cryogenic system for this application. The following paper will outline the findings and the planned approach for the FRIB helium refrigeration system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hannan, M.A., E-mail: hannan@eng.ukm.my; Abdulla Al Mamun, Md., E-mail: md.abdulla@siswa.ukm.edu.my; Hussain, Aini, E-mail: aini@eng.ukm.my
Highlights: • Classification of available technologies for SWM system in four core category. • Organization of technology based SWM systems in three main groups. • Summary of SWM systems with target application, methodology and functional domain. • Issues and challenges are highlighted for further design of a sustainable system. - Abstract: In the backdrop of prompt advancement, information and communication technology (ICT) has become an inevitable part to plan and design of modern solid waste management (SWM) systems. This study presents a critical review of the existing ICTs and their usage in SWM systems to unfold the issues and challengesmore » towards using integrated technologies based system. To plan, monitor, collect and manage solid waste, the ICTs are divided into four categories such as spatial technologies, identification technologies, data acquisition technologies and data communication technologies. The ICT based SWM systems classified in this paper are based on the first three technologies while the forth one is employed by almost every systems. This review may guide the reader about the basics of available ICTs and their application in SWM to facilitate the search for planning and design of a sustainable new system.« less
Designing cost effective water demand management programs in Australia.
White, S B; Fane, S A
2002-01-01
This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.
Rising out-of-pocket costs in disease management programs.
Chernew, Michael E; Rosen, Allison B; Fendrick, A Mark
2006-03-01
To document the rise in copayments for patients in disease management programs and to call attention to the inherent conflicts that exist between these 2 approaches to benefit design. Data from 2 large health plans were used to compare cost sharing in disease management programs with cost sharing outside of disease management programs. The copayments charged to participants in disease management programs usually do not differ substantially from those charged to other beneficiaries. Cost sharing and disease management result in conflicting approaches to benefit design. Increasing copayments may lead to underuse of recommended services, thereby decreasing the clinical effectiveness and increasing the overall costs of disease management programs. Policymakers and private purchasers should consider the use of targeted benefit designs when implementing disease management programs or redesigning cost-sharing provisions. Current information systems and health services research are sufficiently advanced to permit these benefit designs.
The relationship of ecosystem management to NEPA and its goals
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phillips, C.G.; Randolph, J.
The National Environmental Policy Act of 1969 (NEPA) was intended to promote a systematic, comprehensive, interdisciplinary approach to planning and decision making, including the integration of the natural and social sciences and the design arts. NEPA critics have cited three key shortcomings in its implementation: (1) a lack of engagement with the NEPA process early in the planning process through interdisciplinary collaboration; (2) a lack of rigorous science and the incorporation of ecological principles and techniques; and (3) a lack of emphasis on the Act's substantive goals and objectives. In recent years and independent of NEPA, a policy of ecosystemmore » management has been developed, which represents a fundamental change from a fragmented, incremental planning and management approach to a holistic, comprehensive, interdisciplinary land and resource management effort. The authors postulate that by incorporating ecosystem management principles in their planning and decisionmaking, federal agencies can address the shortcomings in NEPA implementation and move closes to NEPA's intent. A case analysis of EISs prepared by the USDA Forest Service before and after adopting an ecosystem management approach supports their hypothesis.« less
NASA Astrophysics Data System (ADS)
Gopalakrishnan, T.; Saravanan, R.
2017-03-01
Powerful management concepts step-up the quality of the product, time saving in producing the product thereby increase the production rate, improves tools and techniques, work culture, work place and employee motivation and morale. In this paper discussed about the case study of optimizing the tool design, tool parameters to cast off expansion plan according ECRS technique. The proposed designs and optimal tool parameters yielded best results and meet the customer demand without expansion plan. Hence the work yielded huge savings of money (direct and indirect cost), time and improved the motivation and more of employees significantly.
The Lunar Mapping and Modeling Project
NASA Technical Reports Server (NTRS)
Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.
2009-01-01
The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.
David E. Busch; Jon R. Martin
2006-01-01
Based on ten years of Northwest Forest Plan implementation, we focus on key scientifically-oriented questions relating to improving Plan monitoring. The questions, which fall into groups concerning issues of scale, integration, and efficiency, have applicability to monitoring programs being designed and implemented throughout the world. Progress toward answering such...
Use of Web Technology to Access and Update College Plans
ERIC Educational Resources Information Center
Valeau, Edward J.; Luan, Jing
2007-01-01
In this study, the process and outcome of a web-based planning application, called Ports of Call, are discussed. The application allows college management to create, edit, and report out activities relating to college plans, all through a web browser. Its design was based on best practices in modern web technology and the application can be easily…
Preservation Planning Program. Study Report. Iowa State University Library. Final Report.
ERIC Educational Resources Information Center
Galejs, John; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…
ERIC Educational Resources Information Center
Social and Rehabilitation Service (DHEW), Washington, DC.
The Social Work Education Planning and Assessment (SWEPA) System is an information system designed to function within social work education toward two main purposes: (1) to help schools more effectively specify their own educational objectives, plan their social work education projects to achieve these objectives, mark their progress toward this…
ERIC Educational Resources Information Center
Illinois Inst. for Environmental Quality, Chicago.
This master plan for environmental and energy higher education in Illinois is a direct result of a mandate from the Illinois General Assembly. To prepare students to confront our nation's environmental problems, each university will submit a management and development plan, designed to preserve existing environmental values and provide…
Issues in the Management of Distance Education.
ERIC Educational Resources Information Center
Murgatroyd, Stephen; Woudstra, Andrew
1989-01-01
Examines key issues facing administrators at Athabasca University and discusses their implications for distance education organizations. Topics discussed include strategic planning; accountability and cost effectiveness; consortia and cooperation; instructional design; managing technological innovation; marketing; quality assurance; and…
Coastal Stormwater Management Through Green Infrastructure: A Handbook for Municipalities
The handbook is designed to assist municipalities within the Massachusetts Bay and Cape Cod Bay areas to incorporate green infrastructure into their stormwater management planning. It can also be readily applied to other states.
ERIC Educational Resources Information Center
Cowin, Roy; Reyes-Guerra, David
1977-01-01
Engineers may be involved in various functions such as research, development, planning, design (analysis and synthesis), construction, operation and management of engineering projects. This article discusses some branches of accredited engineering curricula, employment opportunities, the preparation for management, minimum education needed, women…
1974-11-01
management, organization, and operation of activities designed to achieve the mission/function covered by the measure. An important use of the...presents an evaluation plan designed to assist the Army in the overall assessment of its effectiveness in terms of the goals of the CONUS...ongoing operations plus encourage the design and imple- mentation of any needed changes in the future without excessive delav and turbulence
Rosenthal, Meredith; Milstein, Arnold
2004-01-01
Context Despite widespread publicity of consumer-directed health plans, little is known about their prevalence and the extent to which their designs adequately reflect and support consumerism. Objective We examined three types of consumer-directed health plans: health reimbursement accounts (HRAs), premium-tiered, and point-of-care tiered benefit plans. We sought to measure the extent to which these plans had diffused, as well as to provide a critical look at the ways in which these plans support consumerism. Consumerism in this context refers to efforts to enable informed consumer choice and consumers' involvement in managing their health. We also wished to determine whether mainstream health plans—health maintenance organization (HMO), point of service (POS), and preferred provider organization (PPO) models—were being influenced by consumerism. Data Sources/Study Setting Our study uses national survey data collected by Mercer Human Resource Consulting from 680 national and regional commercial health benefit plans on HMO, PPO, POS, and consumer-directed products. Study Design We defined consumer-directed products as health benefit plans that provided (1) consumer incentives to select more economical health care options, including self-care and no care, and (2) information and support to inform such selections. We asked health plans that offered consumer-directed products about 2003 enrollment, basic design features, and the availability of decision support. We also asked mainstream health plans about their activities that supported consumerism (e.g., proactive outreach to inform or influence enrollee behavior, such as self-management or preventive care, reminders sent to patients with identified medical conditions.) Data Collection/Extraction Methods We analyzed survey responses for all four product lines in order to identify those plans that offer health reimbursement accounts (HRAs), premium-tiered, or point-of-care tiered models as well as efforts of mainstream health plans to engage informed consumer decision making. Principal Findings The majority of enrollees in consumer-directed health plans are in tiered models (primarily point-of-care tiered networks) rather than HRAs. Tiers are predominantly determined based on both cost and quality criteria. Enrollment in HRAs has grown substantially, in part because of the entry of mainstream managed care plans into the consumer-directed market. Health reimbursement accounts, tiered networks, and traditional managed care plans vary in their capacity to support consumers in managing their health risks and selection of provider and treatment options, with HRAs providing the most and mainstream plans the least. Conclusions While enrollment in consumer-directed health plans continues to grow steadily, it remains a tiny fraction of all employer-sponsored coverage. Decision support in these plans, a critical link to help consumers make more informed choices, is also still limited. This lack may be of concern in light of the fact that only a minority of such plans report that they monitor claims to protect against underuse. Tiered benefit models appear to be more readily accepted by the market than HRAs. If they are to succeed in optimizing consumers' utility from health benefit spending, careful attention needs to be paid to how well these models inform consumers about the consequences of their selections. PMID:15230911
Probe interface design consideration. [for interplanetary spacecraft missions
NASA Technical Reports Server (NTRS)
Casani, E. K.
1974-01-01
Interface design between a probe and a spacecraft requires not only technical considerations but also management planning and mission analysis interactions. Two further aspects of importance are the flyby versus the probe trade-off, and the relay link design and data handling optimization.
Sustainability for the Americas Initiative: Land Design Institute, Ball State University
J. L. Motloch; Pedro Pacheco; Eloy F. Jr. Casagrande
2006-01-01
The Ball State University Land Design Institute (LDI) pursues ecologically and culturally sustainable land design through education, research, outreach, and demonstration. LDI seeks to lead communities (local, regional, global) to sustainable futures. It connects communities and sustainability experts to optimize education about land management, planning, and design...
43 CFR 1610.7-2 - Designation of areas of critical environmental concern.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Designation of areas of critical..., PROGRAMMING, BUDGETING Resource Management Planning § 1610.7-2 Designation of areas of critical environmental concern. Areas having potential for Areas of Critical Environmental Concern (ACEC) designation and...
NASA Technical Reports Server (NTRS)
1971-01-01
A description is given of the proposed project organization, documentation and reports, project planning, direction and control, related experience and facilities, and cost estimate data and options for the implementation of the bioresearch module development program.
EPA Cape Cod 208 Plan 2015 Update Approval Letter
EPA approval letter re: certification by the Governor of MA that the Cape Cod WQM Plan Update is consistent with CWA section 208(b)(3) & accepted the Commonwealth’s reaffirmation of the existing designations of Cape Cod Towns as waste management agencies.
The First International Biosphere Reserve Congress.
ERIC Educational Resources Information Center
Laird, John
1984-01-01
Presents objectives (and related activities) of a plan designed for international collaboration in conserving key natural areas (biosphere reserves) of the globe. The plan (focusing on such areas as management, conservation, research, monitoring, and environmental education/training) was formulated during the First International Biosphere Reserve…
ERIC Educational Resources Information Center
Glasser, Ralph
Management is concerned with the conception and choice of goals. A manager must first determine his own goals within the framework of overriding organizational objectives and limitations. Second, a manager must determine what methods he will use to achieve his goals--on the basis of cost-benefit comparisons. Third, the manager must design his…
ERIC Educational Resources Information Center
Morrison, James L.; Ashley, William C.
This handbook was designed to accompany a three-day workshop for senior administrators in higher education on proactive management techniques in higher education. Proactive management allows for anticipating change and managing uncertainty in place of crisis management or reactive actions. The workshop covered: (1) strategic thinking; (2)…
Redefining thermal regimes to design reserves for coral reefs in the face of climate change.
Chollett, Iliana; Enríquez, Susana; Mumby, Peter J
2014-01-01
Reef managers cannot fight global warming through mitigation at local scale, but they can use information on thermal patterns to plan for reserve networks that maximize the probability of persistence of their reef system. Here we assess previous methods for the design of reserves for climate change and present a new approach to prioritize areas for conservation that leverages the most desirable properties of previous approaches. The new method moves the science of reserve design for climate change a step forwards by: (1) recognizing the role of seasonal acclimation in increasing the limits of environmental tolerance of corals and ameliorating the bleaching response; (2) using the best proxy for acclimatization currently available; (3) including information from several bleaching events, which frequency is likely to increase in the future; (4) assessing relevant variability at country scales, where most management plans are carried out. We demonstrate the method in Honduras, where a reassessment of the marine spatial plan is in progress.
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
Redefining Thermal Regimes to Design Reserves for Coral Reefs in the Face of Climate Change
Chollett, Iliana; Enríquez, Susana; Mumby, Peter J.
2014-01-01
Reef managers cannot fight global warming through mitigation at local scale, but they can use information on thermal patterns to plan for reserve networks that maximize the probability of persistence of their reef system. Here we assess previous methods for the design of reserves for climate change and present a new approach to prioritize areas for conservation that leverages the most desirable properties of previous approaches. The new method moves the science of reserve design for climate change a step forwards by: (1) recognizing the role of seasonal acclimation in increasing the limits of environmental tolerance of corals and ameliorating the bleaching response; (2) using the best proxy for acclimatization currently available; (3) including information from several bleaching events, which frequency is likely to increase in the future; (4) assessing relevant variability at country scales, where most management plans are carried out. We demonstrate the method in Honduras, where a reassessment of the marine spatial plan is in progress. PMID:25333380
Lower Gila South Resource Management Plan, La Paz, Maricopa, Pima, Pinal and Yuma Counties, Arizona
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-08-01
Implementation of a resource management plan is proposed for 2.0 million surface acres and 1.9 million acres of subsurface minerals in the Lower Gila South resource area, located in La Paz, Maricopa, Pima, Pinal, and Yuma counties, Arizona. The preferred alternative would involve range land improvements consisting of construction of 47 miles of fence, 10 reservoirs and 7 wells. Portions of the New Water Mountains, Eagletail Mountains, Woosley Peak, and Table Top Mountains wilderness study areas (WSAs), totaling 190,391 acres, would be designated as wilderness. The remaining portions of these WSAs and eight other WSAs, totaling 431,540 acres, would notmore » be recommended for wilderness designation and would revert to multiple-use management. Approximately 72,123 acres of isolated land parcels would be made available for sale or exchange, approximately 36,845 acres of nonpublic lands would be acquired, 112,160 acres of state and private mineral estate would be acquired, and 23,645 acres of federal minerals would be disposed of to facilitate management. Ten utility corridors would be designated. Mineral access and off-road vehicle use would be restricted on the lands proposed for wilderness designation.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-27
... Monitoring Branch, Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency... Management Division, U.S. Environmental Protection Agency, Region 4, 61 Forsyth Street SW., Atlanta, Georgia..., Air, Pesticides and Toxics Management Division, U.S. Environmental Protection Agency, Region 4, 61...
Does PDC Belong in Facilities Management?
ERIC Educational Resources Information Center
Dessoff, Alan
2012-01-01
Whether planning, design, and construction (PDC) of buildings should be part of facilities management, with its traditional operations and maintenance functions, or separated from it, has been a divisive question on many campuses for a long time. Now, although it is not happening everywhere, facilities managers at a number of institutions, public…
23 CFR 660.105 - Planning and route designation.
Code of Federal Regulations, 2013 CFR
2013-04-01
...) regarding the establishment and implementation of pavement, bridge, and safety management systems for FHs... pavement management systems for FHs on Federal-aid highways are to be provided by the SHAs for... pavement management results for FHs which are not Federal-aid highways. (c) The FHWA, in consultation with...
23 CFR 660.105 - Planning and route designation.
Code of Federal Regulations, 2014 CFR
2014-04-01
...) regarding the establishment and implementation of pavement, bridge, and safety management systems for FHs... pavement management systems for FHs on Federal-aid highways are to be provided by the SHAs for... pavement management results for FHs which are not Federal-aid highways. (c) The FHWA, in consultation with...
23 CFR 660.105 - Planning and route designation.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) regarding the establishment and implementation of pavement, bridge, and safety management systems for FHs... pavement management systems for FHs on Federal-aid highways are to be provided by the SHAs for... pavement management results for FHs which are not Federal-aid highways. (c) The FHWA, in consultation with...
23 CFR 660.105 - Planning and route designation.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) regarding the establishment and implementation of pavement, bridge, and safety management systems for FHs... pavement management systems for FHs on Federal-aid highways are to be provided by the SHAs for... pavement management results for FHs which are not Federal-aid highways. (c) The FHWA, in consultation with...
23 CFR 660.105 - Planning and route designation.
Code of Federal Regulations, 2012 CFR
2012-04-01
...) regarding the establishment and implementation of pavement, bridge, and safety management systems for FHs... pavement management systems for FHs on Federal-aid highways are to be provided by the SHAs for... pavement management results for FHs which are not Federal-aid highways. (c) The FHWA, in consultation with...
Monitoring components of GypsES
Lukas P. Schaub; F. William Ravlin; Jesse A. Logan; Shelby J. Fleischer
1991-01-01
The manager needs tools for assistance in planning and interpreting monitoring systems. We are building a system that designs sampling programs by interpreting data about Gypsy Moth, stand condition and management objectives. The system prioritizes areas within the management unit within budgetary constraints and defines the areas to be monitored. The system proposes...
Nursing and the Management Function.
ERIC Educational Resources Information Center
Sherman, V. Clayton
The report describes a study designed to analyze nurses' management duties and to identify their tasks in planning, organizing, staffing. leading, communication, decision making, and controlling. A total of 117 supervisory nurses and unit managers from four Western Michigan short-term general hospitals in the 410-540 bed range participated in the…
Classroom Management for Early Childhood Music Settings
ERIC Educational Resources Information Center
Koops, Lisa Huisman
2018-01-01
Classroom management is a common concern for preservice teachers and can be a key to success for in-service teachers. In this article, I discuss six strategies for classroom management: design and lead engaging music activities, employ music-rich transitions, balance familiarity and novelty, plan for success, communicate clear expectations, and…
Facilities Management: A Manual for Plant Administration.
ERIC Educational Resources Information Center
Evans, Teresa Burnau, Ed.
Major aspects of the management of the physical plant of campuses are considered in 42 chapters. The five major sections cover: personnel services; budgeting and accounting; maintenance management; plant operations; and planning, design, and construction. A conclusion describes proven methods and criteria for self-evaluation of the physical plant.…
A National Strategic Plan for Natural Resources and Environmental Management Education.
ERIC Educational Resources Information Center
Fridgen, Cynthia
1995-01-01
The Natural Resources and Environmental Management Program is designed to help people understand their relationship to the environment, practice stewardship, make informed decisions, and appreciate biodiversity. Areas of emphasis include air, land, and water quality; citizen responsibility; conflict management; approaches to land use and species…
Medical management of youth baseball and softball tournaments.
Kanaan, Matthew; Ray, Tracy R
2013-01-01
The medical management of youth baseball and softball tournaments requires both proper planning and a basic awareness of commonly seen sport-specific injuries. While youth sporting events are designed to be a fun experience for all, injuries and emergencies will occur. With proper planning, and supplies, the impact of these issues can be minimized. This article will outline some basic principles for the medical personnel that may be involved in youth baseball and softball events.
1981-07-01
including a recreation impact analysis, aquatic and terrestrial ecosystems assessment and a fish and wildlife management plan), social and cultural...APPENDIX G - DESIGN AND COST ESTIMATES VOLUME III - APPENDIX H - RECREATION AND NATURAL RESOURCES Section 1 - Recreation Impact Analysis Section 2 - Aquatic... Ecosystem Assessment Section 3 - Terrestrial Ecosystem Assessment Section 4 - Fish and Wildlife Management Plan APPENDIX I - SOCIAL AND CULTURAL
A Decision-Support System for Sustainable Water Distribution System Planning.
Freund, Alina; Aydin, Nazli Yonca; Zeckzer, Dirk; Hagen, Hans
2017-01-01
An interactive decision-support system (DSS) can help experts prepare water resource management plans for decision makers and stakeholders. The design of the proposed prototype incorporates visualization techniques such as circle views, grid layout, small multiple maps, and node simplification to improve the data readability of water distribution systems. A case study with three urban water management and sanitary engineering experts revealed that the proposed DSS is satisfactory, efficient, and effective.
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Initiatives to Develop Web Sites Including Information about Brownfields Properties
This web site was created to assist in planning, designing, and operating web sites that include information about individual brownfields properties. The report is of value to parties designing or managing such sites.
Brownfields Recommendations for Sustainable Site Design — Green Landscape Plan
The assessment of conditions contained in this report focuses on site-specific environmental and soil conditions that might affect recommendations related to sustainable landscaping and site design, stormwater management, and stormwater reuse.
NASA Astrophysics Data System (ADS)
Jeuken, Ad; Mendoza, Guillermo; Matthews, John; Ray, Patrick; Haasnoot, Marjolijn; Gilroy, Kristin; Olsen, Rolf; Kucharski, John; Stakhiv, Gene; Cushing, Janet; Brown, Casey
2016-04-01
Engineers and water managers have always incorporated uncertainty in water resources operations, design and planning. In recent years, concern has been growing concern that many of the fundamental principles to address uncertainty in planning and design are insufficient for coping with unprecedented shifts in climate, especially given the long lifetimes of water investments - spanning decades, even centuries. Can we design and operate new flood risk management, energy, water supply and sanitation, and agricultural projects that are robust to shifts over 20, 50, or more years? Since about 2009, better approaches to planning and designing under climate uncertainty have been gaining ground worldwide. The main challenge is to operationalize these approaches and bring them from science to practice, embed them within the existing decision-making processes of particular institutions, and shift from highly specialized "boutique" applications to methods that result in consistent, replicable outcomes accessible to water managers worldwide. With CRIDA a serious step is taken to achieve these goals. CRIDA is built on two innovative but complementary approaches that have developed in isolation across the Atlantic over the past seven years: diagnosing and assessing risk (decision scaling), and developing sequential decision steps to compensate for uncertainty within regulatory / performance standards (adaptation pathways). First, the decision scaling or "bottom up" framework to climate change adaptation was first conceptualized during the US/Canada Great Lakes regulation study and has recently been placed in a decision-making context for water-related investments published by the World Bank Second, the adaptation pathways approach was developed in the Netherlands to cope with the level of climate uncertainty we now face. Adaptation pathways is a tool for maintaining options and flexibility while meeting operational goals by envisioning how sequences of decisions can be navigated over time. They are part of the Dutch adaptive planning approach Adaptive Delta Management, executed and develop by the Dutch Delta program. Both decision scaling and adaptation pathways have been piloted in studies worldwide. The objective of CRIDA is to mainstream effective climate adaptation for professional water managers. The CRIDA publication, due in april 2016, follows the generic water design planning design cycle. At each step, CRIDA describes stepwise guidance for incorporating climate robustness: problem definition, stress test, alternatives formulation and recommendation, evaluation and selection. In the presentation the origin, goal, steps and practical tools available at each step of CRIDA will be explained. In two other abstracts ("Climate Risk Informed Decision Analysis: A Hypothetical Application to the Waas Region" by Gilroy et al., "The Application of Climate Risk Informed Decision Analysis to the Ioland Water Treatment Plant in Lusaka, Zambia, by Kucharski et al.), the application of CRIDA to cases is explained
2002-10-31
NJ: Lawrence Erlbaum. Jamal, T. B. & Getz, D. (1995). Collaboration Theory and Community Tourism Planning. Annals of Tourism Planning...Surveys, 31. Jamal, T. B. & Getz, D. (1995). Collaboration Theory and Community Tourism Planning. Annals of Tourism Planning Research, 22 (1...granum/altdocs/dav_alt.htm. Jorn, L. A., Duin, A. H., & Wahlstrom, B. J. (1996). Designing and Managing Virtual Learning ommunities . IEEE
Efficacy of a Transition Theory-Based Discharge Planning Program for Childhood Asthma Management.
Ekim, Ayfer; Ocakci, Ayse Ferda
2016-02-01
This study tested the efficacy of a nurse-led discharge planning program for childhood asthma management, based on transition theory. A quasi-experimental design was used. The sample comprised 120 children with asthma and their parents (intervention group n = 60, control group n = 60). The asthma management self-efficacy perception level of parents in the intervention group increased significantly and the number of triggers their children were exposed to at home was reduced by 60.8%. The rates of admission to emergency departments and unscheduled outpatient visits were significantly lower in the intervention group compared with the control group. Transition theory-based nursing interventions can provide successful outcomes on childhood asthma management. Transition theory-based discharge planning program can guide nursing interventions to standardize care of the child with asthma. Combining care at home with hospital care strengthens ongoing qualified asthma management. © 2015 NANDA International, Inc.
Managing Curriculum: Rapid Implementation and Sustainability of a Districtwide Data Initiative
ERIC Educational Resources Information Center
Wayman, Jeffrey C.; Conoly, Katherine
2006-01-01
In March 2003, the Corpus Christi Independent School District (CCISD) received a Curriculum Management Audit report from the Texas Curriculum Management Audit Center of the Texas Association of School Administrators. One of the findings of this audit was that CCISD lacked a clear comprehensive management plan to define and guide the design,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-10
... Critical Environmental Concern (ACEC); Wild and Scenic River recommendations; Off-Highway Vehicle Area Designations; Special Recreation Management Areas; Wild Horse and Burro management; consideration of non... protective management will be made in accordance with Section 5(d) of the Wild and Scenic Rivers Act and BLM...
ERIC Educational Resources Information Center
Goldblatt, Steven M.; Wood, R. Craig
Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…
Lindberg, Arley
2012-01-01
Federal welfare reform, local service collaborations, and the evolution of statewide information systems inspired agency interest in evidence-informed practice and knowledge sharing systems. Four agency leaders, including the Director, Deputy Director, Director of Planning and Evaluation, and Staff Development Program Manager championed the development of a learning organization based on knowledge management throughout the agency. Internal department restructuring helped to strengthen the Planning and Evaluation, Staff Development, and Personnel units, which have become central to supporting knowledge sharing activities. The Four Pillars of Knowledge framework was designed to capture agency directions in relationship to future knowledge management goals. Featuring People, Practice, Technology and Budget, the framework links the agency's services, mission and goals to the process of becoming a learning organization. Built through an iterative process, the framework was created by observing existing activities in each department rather than being designed from the top down. Knowledge management can help the department to fulfill its mission despite reduced resources. Copyright © Taylor & Francis Group, LLC
Taheri, Safoura; Ehsanpour, Soheila; Kohan, Shahnaz
2014-03-01
Organizational and structural obstacles are a group of major obstacles in achievement of appropriate family planning counseling. Detection of these obstacles from the viewpoint of managers, staffs and clients who are key members in health services providing system is a major step toward appropriate planning to modify or delete this group of obstacles. The present study was conducted with the goal of comparing managers', staffs' and clients' viewpoints about organizational and structural obstacles in family planning counseling in health-care centers in Isfahan in 2012. This is a cross-sectional one-step three-group comparative descriptive study conducted on 295 subjects including 59 managers, 110 staffs and 126 clients in medical health-care centers in Isfahan in 2012. Managers and the staffs were selected by census sampling and the clients were recruited through convenient random sampling. The date collection tool was a researcher made questionnaire, which was designed in two sections of fertility and personal characteristics and viewpoint measurement. Descriptive and inferential statistical test were used to analyze the data. The obtained results showed no significant difference between mean scores of viewpoints in three groups of managers, staffs and clients concerning organizational and structural obstacles in family planning counseling (P = 0.677). In addition, most of the managers, staffs and clients reported organizational and structural obstacles as the obstacles in the process of family planning in moderate level. The results showed the necessity of health services managers' planning to modify or delete organizational and structural obstacles especially the agreed obstacles from the viewpoint of managers, staffs and clients.
UTILITY DATA ARCHIVING FOR RISK MANAGEMENT
EPA let a contract for a consultant to collect information about historical changes in operations and maintenance, design and construction, and planning and siting for water and wastewater infrastructure. The goal of this research study is to determine risk management alternativ...
Infrastructure Task Force Tribal Solid Waste Management
These documents describe 1) issues to consider when planning and designing community engagement approaches for tribal integrated waste management programs and 2) a proposed approach to improve tribal open dumps data and solid waste projects, and 3) an MOU.
Relational Database Design in Information Science Education.
ERIC Educational Resources Information Center
Brooks, Terrence A.
1985-01-01
Reports on database management system (dbms) applications designed by library school students for university community at University of Iowa. Three dbms design issues are examined: synthesis of relations, analysis of relations (normalization procedure), and data dictionary usage. Database planning prior to automation using data dictionary approach…
75 FR 7608 - Statement of Organization, Functions and Delegations of Authority
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... cards; (4) provides planning, management and oversight of all interior design projects, move services... program-level HRSA components in the design and conduct of evaluations; (5) develops annual performance... training program, and the mentoring program; (2) develops, designs, and implements a comprehensive...
Social Impact Management Plans: Innovation in corporate and public policy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Franks, Daniel M., E-mail: d.franks@uq.edu.au; Vanclay, Frank, E-mail: frank.vanclay@rug.nl
Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples aremore » analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.« less
Decision Support Systems for Research and Management in Advanced Life Support
NASA Technical Reports Server (NTRS)
Rodriquez, Luis F.
2004-01-01
Decision support systems have been implemented in many applications including strategic planning for battlefield scenarios, corporate decision making for business planning, production planning and control systems, and recommendation generators like those on Amazon.com(Registered TradeMark). Such tools are reviewed for developing a similar tool for NASA's ALS Program. DSS are considered concurrently with the development of the OPIS system, a database designed for chronicling of research and development in ALS. By utilizing the OPIS database, it is anticipated that decision support can be provided to increase the quality of decisions by ALS managers and researchers.
Nonprice Competition and Quality of Care in Managed Care: The New York SCHIP Market
Liu, Hangsheng; Phelps, Charles E
2008-01-01
Objective To examine the effect of nonprice competition among managed care plans on the quality of care in the New York SCHIP market. Data Sources U.S. Census 2000; 2002 New York State Managed Care Plan Performance Report; and 2001 New York State Managed Care Annual Enrollment Report. Study Design Each market is defined as a county, and competition is measured as the number of plans in a market. Quality of care is measured in percentages using three Consumer Assessment of Health Plans Survey and three Health Plan Employer Data and Information Set scores. Two-stage least squares is applied to address the endogeneity between competition and the quality of care, using population as an instrument. Principle Findings We find a negative association between competition and quality of care. An additional managed care plan is significantly associated with a decrease of 0.40–2.31 percentage points in four out of six quality measures. After adjusting for production cost, a positive correlation is observed between price and quality measures across different pricing regions. Conclusions It seems likely that pricing policy is a constraint on quality production, although it may not be interpreted as a causal relationship and further study is needed. PMID:18454776
Code of Federal Regulations, 2011 CFR
2011-04-01
... been taken in accordance with the strategic plan and provide notice of updates and modifications to the strategic plan. In addition to these reports, such other information relating to designated Empowerment... required to submit in accordance with this part. (Approved by the Office of Management and Budget under...
Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter
2009-11-01
This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.
The science of trail surveys: Recreation ecology provides new tools for managing wilderness trails
Marion, Jeffrey L.; Wimpey, Jeremy F.; Park, Logan O.
2011-01-01
Recreation ecology examines the effects of recreation on protected area ecosystems. One core focus of recreation ecology research is trail science, including the development of efficient protocols to assess and monitor the type and severity of resource impacts, analyses to improve knowledge of factors that influence trail conditions, and studies to assist land managers in improving trail design, maintenance, and visitor management. This article reviews alternative trail survey methodologies most useful for the management of wilderness and backcountry trail networks. Illustrations and implications from survey data for trail planning, design, and management are included.
Roman, Lara A; Fristensky, Jason P; Eisenman, Theodore S; Greenfield, Eric J; Lundgren, Robert E; Cerwinka, Chloe E; Hewitt, David A; Welsh, Caitlin C
2017-12-01
Many municipalities are setting ambitious tree canopy cover goals to increase the extent of their urban forests. A historical perspective on urban forest development can help cities strategize how to establish and achieve appropriate tree cover targets. To understand how long-term urban forest change occurs, we examined the history of trees on an urban college campus: the University of Pennsylvania in Philadelphia, PA. Using a mixed methods approach, including qualitative assessments of archival records (1870-2017), complemented by quantitative analysis of tree cover from aerial imagery (1970-2012), our analysis revealed drastic canopy cover increase in the late 20th and early 21st centuries along with the principle mechanisms of that change. We organized the historical narrative into periods reflecting campus planting actions and management approaches; these periods are also connected to broader urban greening and city planning movements, such as City Beautiful and urban sustainability. University faculty in botany, landscape architecture, and urban design contributed to the design of campus green spaces, developed comprehensive landscape plans, and advocated for campus trees. A 1977 Landscape Development Plan was particularly influential, setting forth design principles and planting recommendations that enabled the dramatic canopy cover gains we observed, and continue to guide landscape management today. Our results indicate that increasing urban tree cover requires generational time scales and systematic management coupled with a clear urban design vision and long-term commitments. With the campus as a microcosm of broader trends in urban forest development, we conclude with a discussion of implications for municipal tree cover planning.
NASA Astrophysics Data System (ADS)
Roman, Lara A.; Fristensky, Jason P.; Eisenman, Theodore S.; Greenfield, Eric J.; Lundgren, Robert E.; Cerwinka, Chloe E.; Hewitt, David A.; Welsh, Caitlin C.
2017-12-01
Many municipalities are setting ambitious tree canopy cover goals to increase the extent of their urban forests. A historical perspective on urban forest development can help cities strategize how to establish and achieve appropriate tree cover targets. To understand how long-term urban forest change occurs, we examined the history of trees on an urban college campus: the University of Pennsylvania in Philadelphia, PA. Using a mixed methods approach, including qualitative assessments of archival records (1870-2017), complemented by quantitative analysis of tree cover from aerial imagery (1970-2012), our analysis revealed drastic canopy cover increase in the late 20th and early 21st centuries along with the principle mechanisms of that change. We organized the historical narrative into periods reflecting campus planting actions and management approaches; these periods are also connected to broader urban greening and city planning movements, such as City Beautiful and urban sustainability. University faculty in botany, landscape architecture, and urban design contributed to the design of campus green spaces, developed comprehensive landscape plans, and advocated for campus trees. A 1977 Landscape Development Plan was particularly influential, setting forth design principles and planting recommendations that enabled the dramatic canopy cover gains we observed, and continue to guide landscape management today. Our results indicate that increasing urban tree cover requires generational time scales and systematic management coupled with a clear urban design vision and long-term commitments. With the campus as a microcosm of broader trends in urban forest development, we conclude with a discussion of implications for municipal tree cover planning.
Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel
2016-03-01
This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.
Science-based Forest Management in an Era of Climate Change
NASA Astrophysics Data System (ADS)
Swanston, C.; Janowiak, M.; Brandt, L.; Butler, P.; Handler, S.; Shannon, D.
2014-12-01
Recognizing the need to provide climate adaptation information, training, and tools to forest managers, the Forest Service joined with partners in 2009 to launch a comprehensive effort called the Climate Change Response Framework (www.forestadaptation.org). The Framework provides a structured approach to help managers integrate climate considerations into forest management plans and then implement adaptation actions on the ground. A planning tool, the Adaptation Workbook, is used in conjunction with vulnerability assessments and a diverse "menu" of adaptation approaches to generate site-specific adaptation actions that meet explicit management objectives. Additionally, a training course, designed around the Adaptation Workbook, leads management organizations through this process of designing on-the-ground adaptation tactics for their management projects. The Framework is now being actively pursued in 20 states in the Northwoods, Central Hardwoods, Central Appalachians, Mid-Atlantic, and New England. The Framework community includes over 100 science and management groups, dozens of whom have worked together to complete six ecoregional vulnerability assessments covering nearly 135 million acres. More than 75 forest and urban forest adaptation strategies and approaches were synthesized from peer-reviewed and gray literature, expert solicitation, and on-the-ground adaptation projects. These are being linked through the Adaptation Workbook process to on-the-ground adaptation tactics being planned and employed in more than 50 adaptation "demonstrations". This presentation will touch on the scientific and professional basis of the vulnerability assessments, and showcase efforts where adaptation actions are currently being implemented in forests.
50 CFR 300.65 - Catch sharing plan and domestic management measures in waters in and off Alaska.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Municipality Solomon Census Designated Place South Naknek Census Designated Place St. Michael Municipality... of Sheldon's Point Shishmaref Native Village of Shishmaref Solomon Village of Solomon South Naknek...
Forest landscape description and inventories - a basis for landplanning and design
R. Burton Litton
1968-01-01
Describes six analytical factors and seven compositional types useful in recognition and description of scenic resources. Illustrates their application in two inventories made to aid managers and landscape architects in planning and design.
Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.
Jonathan Thompson
2007-01-01
The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoringâthe systematic observation and measurement of a set...
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Azorbo, S; Muna, C
1993-01-01
The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.
FRAMEWORK DESIGN FOR BMP PLACEMENT IN URBAN WATERSHEDS
BMP processes into one model is highly desirable To assist stormwater management professionals in planning for best management practices (BMPs) implementation, the U.S. Environmental Protection Agency (USEPA) is developing a decision support system for placement of BMPs at strat...
36 CFR 219.27 - Special designations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... National Forest System Land and Resource Management Planning Special Considerations § 219.27 Special... areas within the National Forest System that are identified for their unique or special characteristics... and may have specific requirements for their management. (b) Wilderness area reviews. Unless federal...
Archived data management systems : a cross-cutting study : linking operations and planning data
DOT National Transportation Integrated Search
2005-12-01
This report examines five transportation agencies that have established and are operating successful ADMSs (Archived Data Management Systems), and one that is on the verge of becoming fully operational. This study discusses the design choices, operat...
DOT National Transportation Integrated Search
1994-01-01
The Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 required that states develop systems for managing highway pavement, bridges, safety, congestion, public transportation, and intermodal transportation. This document is Virginia's wo...
A Watershed-scale Design Optimization Model for Stormwater Best Management Practices
U.S. Environmental Protection Agency developed a decision-support system, System for Urban Stormwater Treatment and Analysis Integration (SUSTAIN), to evaluate alternative plans for stormwater quality management and flow abatement techniques in urban and developing areas. SUSTAI...
ERIC Educational Resources Information Center
Barnes, James L.
This curriculum guide is designed to assist junior high school industrial arts teachers in planning new courses and revising existing courses in manufacturing technology. Addressed in the individual units of the guide are the following topics: introduction to manufacturing, materials processing, personnel management, production management,…
The Denver region traffic signal system improvement program : planning for management and operations
DOT National Transportation Integrated Search
2009-04-01
The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...
Design and Implementation of Total Quality Management in a Civil Engineering Squadron
1989-09-01
instruct employees and seek new ways to integrate quality into all functions, such as planning, marketing , and controlling. The second strategy is for...implement a TQM plan that contributes to the overall DOD TQM process. 7 2. Managers at all levels will provide leadership and integrate TQM principles... integral part of our daily activities. 8 3. Quality improvement is the key to productivity improvement and must be pursued with the necessary resources to
Improving Management of Military Construction Planning and Design
1991-10-01
waterfront facilities and operations and its transportation systems, owns and operates JFK Airport . The Port Authority has an extremely capable and...restructured, and many projects are being deferred until the economic picture brightens. Airline user fees are the principal source of income for the JFK ... Airport . This "downsizing" has caused major schedule readjustment and sequencing of designs to ensure compatibility with existing facilities. In managing
Implementing successful strategic plans: a simple formula.
Blondeau, Whitney; Blondeau, Benoit
2015-01-01
Strategic planning is a process. One way to think of strategic planning is to envision its development and design as a framework that will help your hospital navigate through internal and external changing environments over time. Although the process of strategic planning can feel daunting, following a simple formula involving five steps using the mnemonic B.E.G.I.N. (Begin, Evaluate, Goals & Objectives, Integration, and Next steps) will help the planning process feel more manageable, and lead you to greater success.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kleb, H.R.; Zelmer, R.L.
2007-07-01
The Low-Level Radioactive Waste Management Office was established in 1982 to carry out the federal government's responsibilities for low-level radioactive (LLR) waste management in Canada. In this capacity, the Office operates programs to characterize, delineate, decontaminate and consolidate historic LLR waste for interim and long-term storage. The Office is currently the proponent of the Port Hope Area Initiative; a program directed at the development and implementation of a safe, local long-term management solution for historic LLR waste in the Port Hope area. A legal agreement between the Government of Canada and the host community provides the framework for the implementationmore » of the Port Hope Project. Specifically, the agreement requires that the surface of the long-term LLR waste management facility be 'conducive to passive and active recreational uses such as soccer fields and baseball diamonds'. However, there are currently no examples of licensed LLR waste management facilities in Canada that permit recreational use. Such an end use presents challenges with respect to engineering and design, health and safety and landscape planning. This paper presents the cover system design, the environmental effects assessment and the landscape planning processes that were undertaken in support of the recreational end use of the Port Hope long-term LLR waste management facility. (authors)« less
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
38 CFR 21.92 - Preparation of the plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) VOCATIONAL REHABILITATION AND EDUCATION Vocational Rehabilitation and Employment Under 38 U.S.C. Chapter 31... specialist or counseling psychologist designated as case manager has the primary role in carrying out... counseling psychologist has the primary responsibility for the preparation of plans. (Authority: 38 U.S.C...
Science Facilities Bibliography.
ERIC Educational Resources Information Center
National Science Foundation, Washington, DC.
A bibliographic collection on science buildings and facilities is cited with many different reference sources for those concerned with the design, planning, and layout of science facilities. References are given covering a broad scope of information on--(1) physical plant planning, (2) management and safety, (3) building type studies, (4) design…
40 CFR 262.102 - What special definitions are included in this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE University... particularly hazardous substances as designated in a University's Chemical Hygiene Plan under OSHA, or... Management Plan (EMP) means a written program developed and implemented by the university which sets forth...
Towards the 21st Century. Facilities for Tertiary Education.
ERIC Educational Resources Information Center
Corbett, Anne, Ed.
This report presents observations of experts in planning, design, construction or management of tertiary educational facilities about the emerging issues and the appropriate planning and architectural solutions for higher education facilities as the new millennium approaches. Specific topics discuss the current context of tertiary education…
ERIC Educational Resources Information Center
Keebler, Barbara A.
1989-01-01
Urges Catholic educators to develop a crisis communication plan to ensure that all communication with the press and public is handled promptly and thoroughly by a designated spokesperson. Describes workshops which simulate real-life challenges as a means of testing crisis management plans. Offers guidelines for the development of a crisis…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... wind and geothermal energy projects from aplomado falcon habitat and avoidance of wind and geothermal..., including renewable energy siting, outdoor recreation management, special status species habitat, proposals... geothermal leasing; management as VRM Class II; and limitation of vehicle use to designated routes. Brokeoff...
Hunting and Wildlife Management. Issue Pac.
ERIC Educational Resources Information Center
Fish and Wildlife Service (Dept. of Interior), Washington, DC.
The materials in this educational packet are designed for use with students in grades 4 through 7. They consist of an overview, three lesson plans, student data sheets, and a poster. The overview discusses hunting as a tool for wildlife management, the management of wildlife populations and hunter participation in providing research data, and the…
Adaptive monitoring design for ecosystem management
Paul L. Ringold; Jim Alegria; Raymond L. Czaplewski; Barry S. Mulder; Tim Tolle; Kelly Burnett
1996-01-01
Adaptive management of ecosystems (e.g., Holling 1978, Walters 1986, Everett et al. 1994, Grumbine 1994, Yaffee 1994, Gunderson et al. 1995, Frentz et al. 1995, Montgomery et al. 1995) structures a system in which monitoring iteratively improves the knowledge base and helps refine management plans. This adaptive approach acknowledges that action is necessary or...
Webinar summary: Important findings for managers [Chapter 2
Claudia Regan
2014-01-01
This chapter summarizes key findings and offers take-home messages of the Future Forest Webinar Series with regard to resource management planning, analyses, and project design. In the wake of the mountain pine beetle (MPB) epidemic, resource managers are especially concerned with developing more resilient forests, providing for the sustainability of wildlife and fish...
Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; Donald E. Nute
2011-01-01
This is the user's guide for NED-2, which is the latest version of NED, a forest ecosystem management decision support system. This software is part of a family of software products intended to help resource managers develop goals, assess current and future conditions, and produce sustainable management plans for forest properties. Designed for stand-alone Windows...
Mark J. Twery; Peter D. Knopp; Scott A. Thomasma; Donald E. Nute
2012-01-01
This is the reference guide for NED-2, which is the latest version of NED, a forest ecosystem management decision support system. This software is part of a family of software products intended to help resource managers develop goals, assess current and future conditions, and produce sustainable management plans for forest properties. Designed for stand-alone Windows-...
Analysis of Risk Management in Adapted Physical Education Textbooks
ERIC Educational Resources Information Center
Murphy, Kelle L.; Donovan, Jacqueline B.; Berg, Dominck A.
2016-01-01
Physical education teacher education (PETE) programs vary on how the topics of safe teaching and risk management are addressed. Common practices to cover such issues include requiring textbooks, lesson planning, peer teaching, videotaping, reflecting, and reading case law analyses. We used a mixed methods design to examine how risk management is…
ERIC Educational Resources Information Center
Simerly, Robert G.
This book shows how to design and implement a strategic financial management system for any organization that plans conferences, workshops, and meetings. It guides the reader through steps in the budgeting and strategic financial management process. Case studies, hints, and guidelines for avoiding the most common mistakes are given, and…
Jerry J. Vaske; Rodney R. Zwick; Maureen P. Donnelly
1992-01-01
The Visitor Impact Management (VIM) process is designed to identify unacceptable changes occurring as a result of visitor use and to develop management strategies to keep visitor impacts within acceptable levels. All previous attempts to apply the VIM planning framework have concentrated on specific resources. This paper expands this focus to an entire state. Based on...
Simulation of recreational use in backcountry settings: an aid to management planning
David N. Cole
2002-01-01
Simulation models of recreation use patterns can be a valuable tool to managers of backcountry areas, such as wilderness areas and national parks. They can help fine-tune existing management programs, particularly in places that ration recreation use or that require the use of designated campsites. They can assist managers in evaluating the likely effects of increasing...
Nippak, Pria Md; Veracion, Julius Isidro; Muia, Maria; Ikeda-Douglas, Candace J; Isaac, Winston W
2016-06-01
This report is a description of a balanced scorecard design and evaluation process conducted for the health information management department at an urban non-teaching hospital in Canada. The creation of the health information management balanced scorecard involved planning, development, implementation, and evaluation of the indicators within the balanced scorecard by the health information management department and required 6 months to complete. Following the evaluation, the majority of members of the health information management department agreed that the balanced scorecard is a useful tool in reporting key performance indicators. These findings support the success of the balanced scorecard development within this setting and will help the department to better align with the hospital's corporate strategy that is linked to the provision of efficient management through the evaluation of key performance indicators. Thus, it appears that the planning and selection process used to determine the key indicators within the study can aid in the development of a balanced scorecard for a health information management department. In addition, it is important to include the health information management department staff in all stages of the balanced scorecard development, implementation, and evaluation phases. © The Author(s) 2014.
Tabrizi, Jafar-Sadegh; Farahbakhsh, Mostafa; Shahgoli, Javad; Rahbar, Mohammad Reza; Naghavi-Behzad, Mohammad; Ahadi, Hamid-Reza; Azami-Aghdash, Saber
2015-10-01
Excellence and quality models are comprehensive methods for improving the quality of healthcare. The aim of this study was to design excellence and quality model for training centers of primary health care using Delphi method. In this study, Delphi method was used. First, comprehensive information were collected using literature review. In extracted references, 39 models were identified from 34 countries and related sub-criteria and standards were extracted from 34 models (from primary 39 models). Then primary pattern including 8 criteria, 55 sub-criteria, and 236 standards was developed as a Delphi questionnaire and evaluated in four stages by 9 specialists of health care system in Tabriz and 50 specialists from all around the country. Designed primary model (8 criteria, 55 sub-criteria, and 236 standards) were concluded with 8 criteria, 45 sub-criteria, and 192 standards after 4 stages of evaluations by specialists. Major criteria of the model are leadership, strategic and operational planning, resource management, information analysis, human resources management, process management, costumer results, and functional results, where the top score was assigned as 1000 by specialists. Functional results had the maximum score of 195 whereas planning had the minimum score of 60. Furthermore the most and the least sub-criteria was for leadership with 10 sub-criteria and strategic planning with 3 sub-criteria, respectively. The model that introduced in this research has been designed following 34 reference models of the world. This model could provide a proper frame for managers of health system in improving quality.
Licskai, Christopher; Sands, Todd W; Ferrone, Madonna
2013-01-01
Collaborative self-management is a core recommendation of national asthma guidelines; the written action plan is the knowledge tool that supports this objective. Mobile health technologies have the potential to enhance the effectiveness of the action plan as a knowledge translation tool. To design, develop and pilot a mobile health system to support asthma self-management. The present study was a prospective, single-centre, nonrandomized, pilot preintervention-postintervention analysis. System design and development were guided by an expert steering committee. The network included an agnostic web browser-based asthma action plan smartphone application (SPA). Subjects securely transmitted symptoms and peak flow data daily, and received automated control assessment, treatment advice and environmental alerts. Twenty-two adult subjects (mean age 47 years, 82% women) completed the study. Biophysical data were received on 84% of subject days (subject day = 1 subject × 1 day). Subjects viewed their action plan current zone of control on 54% and current air quality on 61% of subject days, 86% followed self-management advice and 50% acted to reduce exposure risks. A large majority affirmed ease of use, clarity and timeliness, and 95% desired SPA use after the study. At baseline, 91% had at least one symptom criterion for uncontrolled asthma and 64% had ≥2, compared with 45% (P=0.006) and 27% (P=0.022) at study close. Mean Asthma Quality of Life Questionnaire score improved from 4.3 to 4.8 (P=0.047). A dynamic, real-time, interactive, mobile health system with an integrated asthma action plan SPA can support knowledge translation at the patient and provider levels.
Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.
Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge
2015-12-01
Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.
Successful healthcare programs and projects: organization portfolio management essentials.
Pickens, Scott; Solak, Jamie
2005-01-01
Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.
Space station WP-04 power system. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hallinan, G. J.
1987-01-01
Major study activities and results of the phase B study contract for the preliminary design of the space station Electrical Power System (EPS) are summarized. The areas addressed include the general system design, man-tended option, automation and robotics, evolutionary growth, software development environment, advanced development, customer accommodations, operations planning, product assurance, and design and development phase planning. The EPS consists of a combination photovoltaic and solar dynamic power generation subsystem and a power management and distribution (PMAD) subsystem. System trade studies and costing activities are also summarized.
Resource Management in Constrained Dynamic Situations
NASA Astrophysics Data System (ADS)
Seok, Jinwoo
Resource management is considered in this dissertation for systems with limited resources, possibly combined with other system constraints, in unpredictably dynamic environments. Resources may represent fuel, power, capabilities, energy, and so on. Resource management is important for many practical systems; usually, resources are limited, and their use must be optimized. Furthermore, systems are often constrained, and constraints must be satisfied for safe operation. Simplistic resource management can result in poor use of resources and failure of the system. Furthermore, many real-world situations involve dynamic environments. Many traditional problems are formulated based on the assumptions of given probabilities or perfect knowledge of future events. However, in many cases, the future is completely unknown, and information on or probabilities about future events are not available. In other words, we operate in unpredictably dynamic situations. Thus, a method is needed to handle dynamic situations without knowledge of the future, but few formal methods have been developed to address them. Thus, the goal is to design resource management methods for constrained systems, with limited resources, in unpredictably dynamic environments. To this end, resource management is organized hierarchically into two levels: 1) planning, and 2) control. In the planning level, the set of tasks to be performed is scheduled based on limited resources to maximize resource usage in unpredictably dynamic environments. In the control level, the system controller is designed to follow the schedule by considering all the system constraints for safe and efficient operation. Consequently, this dissertation is mainly divided into two parts: 1) planning level design, based on finite state machines, and 2) control level methods, based on model predictive control. We define a recomposable restricted finite state machine to handle limited resource situations and unpredictably dynamic environments for the planning level. To obtain a policy, dynamic programing is applied, and to obtain a solution, limited breadth-first search is applied to the recomposable restricted finite state machine. A multi-function phased array radar resource management problem and an unmanned aerial vehicle patrolling problem are treated using recomposable restricted finite state machines. Then, we use model predictive control for the control level, because it allows constraint handling and setpoint tracking for the schedule. An aircraft power system management problem is treated that aims to develop an integrated control system for an aircraft gas turbine engine and electrical power system using rate-based model predictive control. Our results indicate that at the planning level, limited breadth-first search for recomposable restricted finite state machines generates good scheduling solutions in limited resource situations and unpredictably dynamic environments. The importance of cooperation in the planning level is also verified. At the control level, a rate-based model predictive controller allows good schedule tracking and safe operations. The importance of considering the system constraints and interactions between the subsystems is indicated. For the best resource management in constrained dynamic situations, the planning level and the control level need to be considered together.
A decision support tool for synchronizing technology advances with strategic mission objectives
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.
1992-01-01
Successful accomplishment of the objectives of many long-range future missions in areas such as space systems, land-use planning, and natural resource management requires significant technology developments. This paper describes the development of a decision-support data-derived tool called MisTec for helping strategic planners to determine technology development alternatives and to synchronize the technology development schedules with the performance schedules of future long-term missions. Special attention is given to the operations, concept, design, and functional capabilities of the MisTec. The MisTec was initially designed for manned Mars mission, but can be adapted to support other high-technology long-range strategic planning situations, making it possible for a mission analyst, planner, or manager to describe a mission scenario, determine the technology alternatives for making the mission achievable, and to plan the R&D activity necessary to achieve the required technology advances.
IEC planning: eight state-of-the-art principles.
Middleton, J
1983-12-01
Considerable experience and research has been accumulated in the last 20 years on the ways in which information/education/communication (IEC) programs can be effectively designed, implemented, and evaluated. Possibly more effort has focused on population and family planning IEC than on any other sectoral program of development communication. Several principles have emerged which, taken together, define the state of the art in the field. These principles provide a framework of experience which can guide the development of comprehensive IEC programs. They include: policy and resource assessment; audience analysis; strategy design; message research and pretesting; participation and feedback; management; evaluation; and collaboration. The nature of the national policy base for population and family planning programs will determine the goals and approaches of the IEC program. Strong policies of limitation on popultion growth lead to equally strong and pervasive IEC efforts designed to directly affect contraceptive behavior. Assessment of existing policy is an essential aspect of the design of an effective IEC program. Policies establish the rationale and boundaries for action. Population and family planning programs are concerned with some of the most intimate human behavior. Consequently, structured and sensitive audience analysis has become an integral part of the design of IEC programs. The design of communication strategy requires clearly stated objectives. Principles of human learning are used to structure information appropriately. Message research and pretesting have become integral components of the strategy design process. Small scale research on specific objectives is necessary to establish the basis for message design. Audience participation and feedback in remaining phases of program development and implementation are important. The management of an IEC program requires a specific combination of planning, flexibility, and creativity. Evaluation of program effects--identification of the degree of change toward stated objectives -- is critical to long term assessment of the underlying strategy and the identification both of needed corrections and new directions for the future. Collaboration with and involvement of stakeholders in the design and implementation of a national IEC program significantly raises the probability that support will be forthcoming. Taken together these 8 principles can become the basic building blocks of an effective population/family planning IEC program.
43 CFR 1610.7-2 - Designation of areas of critical environmental concern.
Code of Federal Regulations, 2014 CFR
2014-10-01
... environmental concern. 1610.7-2 Section 1610.7-2 Public Lands: Interior Regulations Relating to Public Lands..., PROGRAMMING, BUDGETING Resource Management Planning § 1610.7-2 Designation of areas of critical environmental concern. Areas having potential for Areas of Critical Environmental Concern (ACEC) designation and...
43 CFR 1610.7-2 - Designation of areas of critical environmental concern.
Code of Federal Regulations, 2013 CFR
2013-10-01
... environmental concern. 1610.7-2 Section 1610.7-2 Public Lands: Interior Regulations Relating to Public Lands..., PROGRAMMING, BUDGETING Resource Management Planning § 1610.7-2 Designation of areas of critical environmental concern. Areas having potential for Areas of Critical Environmental Concern (ACEC) designation and...
43 CFR 1610.7-2 - Designation of areas of critical environmental concern.
Code of Federal Regulations, 2012 CFR
2012-10-01
... environmental concern. 1610.7-2 Section 1610.7-2 Public Lands: Interior Regulations Relating to Public Lands..., PROGRAMMING, BUDGETING Resource Management Planning § 1610.7-2 Designation of areas of critical environmental concern. Areas having potential for Areas of Critical Environmental Concern (ACEC) designation and...
Smart Growth and Transportation
Describes the relationship between smart growth and transportation, focusing smart and sustainable street design, transit-oriented development, parking management, sustainable transportation planning, and related resources.
Storm Water Management Model (SWMM): Performance Review and Gap Analysis
The Storm Water Management Model (SWMM) is a widely used tool for urban drainage design and planning. Hundreds of peer-reviewed articles and conference proceedings have been written describing applications of SWMM. This review focused on collecting information on model performanc...
NTL Data Management Planning "Greenout" Bingo Self Assessment Tool
DOT National Transportation Integrated Search
2016-08-11
This tool is designed to help assess your current data management practices. Pick a dataset or research project, sit down with your data collection team, and discuss each prompt below. This tool can guide DMP improvement by revealing best practices t...
Data Management & Decision Making. Technical Report No. 14.
ERIC Educational Resources Information Center
Speedie, Stuart M.; Sanders, Susan
"Data Management and Decision Making" is a set of instructional materials designed to teach practicing and potential educational administrators about the uses of operations research in educational administration. It consists of five units--"Operations Research in Education,""PERT/CPM: A Planning and Analysis…
Aviation human-in-the-loop simulation studies : experimental planning, design, and data management.
DOT National Transportation Integrated Search
2014-01-01
Researchers from the NASAAmes Flight Cognition Laband the FAAs Aerospace Human Factors Research Lab at the Civil Aerospace Medical Instituteexamined task and workload management by single pilots in very light jets, also called entry-level jets.Thi...
School Food Service Index, 1972-73
ERIC Educational Resources Information Center
Dukiet, Kenneth
1973-01-01
First annual food service index. Should be helpful in guiding administrators in the management of their individual food service operation. Especially designed to be of assistance in planning and evaluating food service facilities and in pinpointing areas of opportunity for food marketing managers. (Author/EA)
FRAMEWORK DESIGN FOR BMP PLACEMENT IN URBAN WATERSHEDS 2005
To assist stormwater management professionals in planning for best management practices (BMPs) implementation, the U.S. Environmental Protection Agency (EPA) began a research project in 2003 to develop a decision support system for selection and placement of BMP/LID at strategic ...
A Climate Change Adaptation Strategy for Management of ...
Sea level rise is causing shoreline erosion, increased coastal flooding, and marsh vulnerability to the impact of storms. Coastal marshes provide flood abatement, carbon and nutrient sequestration, water quality maintenance, and habitat for fish, shellfish, and wildlife, including species of concern, such as the saltmarsh sparrow (Ammodramus caudacutus). We present a climate change adaptation strategy (CCAS) adopted by scientific, management, and policy stakeholders for managing coastal marshes and enhancing system resiliency. A common adaptive management approach previously used for restoration projects was modified to identify climate-related vulnerabilities and plan climate change adaptive actions. As an example of implementation of the CCAS, we describe the stakeholder plans and management actions the US Fish and Wildlife Service and partners developed to build coastal resiliency in the Narrow River Estuary, RI, in the aftermath of Superstorm Sandy. When possible, an experimental BACI (before-after, control-impact) design, described as pre- and post-sampling at the impact site and one or more control sites, was incorporated into the climate change adaptation and implementation plans. Specific climate change adaptive actions and monitoring plans are described and include shoreline stabilization, restoring marsh drainage, increasing marsh elevation, and enabling upland marsh migration. The CCAS provides a framework and methodology for successfully managing coa
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2011 CFR
2011-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2012 CFR
2012-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
14 CFR 1216.302 - Definition of key terms.
Code of Federal Regulations, 2010 CFR
2010-01-01
... performing in-house R&D and for planning, managing, and supporting contractor and grantee R&D), and for other... related facility equipment; design of facilities projects; and advance planning related to future facilities needs. (4) Space Flight, Control and Data Communications (SFCDC). Has similar scope to R&D but...
Evaluating Organizational Change Strategies for University Continuing Education.
ERIC Educational Resources Information Center
Votruba, James C.
The development of a conceptual framework for the design and management of planned institutional change for continuing education programs is described, based on a change project developed by Hanna and Pollicita. Conceptual approaches to planned change in complex organizations and the views of Havelock and Lindquist are considered. The importance…
Developing and Monitoring Individual Education Plans for Handicapped Children.
ERIC Educational Resources Information Center
Armstrong, Mary Lee
The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…
Planning and Designing Safe Facilities
ERIC Educational Resources Information Center
Seidler, Todd
2006-01-01
Those who manage physical education, athletic, and recreation programs have a number of legal duties that they are expected to carry out. Among these are an obligation to take reasonable precautions to ensure safe programs and facilities for all participants, spectators, and staff. Physical education and sports facilities that are poorly planned,…
ERIC Educational Resources Information Center
Green, Stephen; And Others
This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…
Monitoring late-successional forest biodiversity in the Pacific Northwest, U.S.A.
Thomas A. Spies; Jon R. Martin
2006-01-01
The era of ecosystem management for federal forest lands in the Pacific Northwest began in 1994 with the adoption of the Northwest Forest Plan. This plan was designed to maintain and restore species and ecosystems associated with late successional and old-growth forests on over 10 million ha. of federal lands in Washington, Oregon and California. The plan called for...
Information management system study results. Volume 1: IMS study results
NASA Technical Reports Server (NTRS)
1971-01-01
The information management system (IMS) special emphasis task was performed as an adjunct to the modular space station study, with the objective of providing extended depth of analysis and design in selected key areas of the information management system. Specific objectives included: (1) in-depth studies of IMS requirements and design approaches; (2) design and fabricate breadboard hardware for demonstration and verification of design concepts; (3) provide a technological base to identify potential design problems and influence long range planning (4) develop hardware and techniques to permit long duration, low cost, manned space operations; (5) support SR&T areas where techniques or equipment are considered inadequate; and (6) permit an overall understanding of the IMS as an integrated component of the space station.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Munshi, Kiraat D; Mager, Douglas; Ward, Krista M; Mischel, Brian; Henderson, Rochelle R
2018-02-01
Formulary or preferred drug list (PDL) management is an effective strategy to ensure clinically efficient prescription drug management by managed care organizations (MCOs). Medicaid MCOs participating in Florida's Medicaid program were required to use a state-mandated PDL between May and August 2014. To examine differences in prescription drug use and plan costs between a single Florida Medicaid managed care (MMC) health plan that implemented a state-mandated PDL policy on July 1, 2014, and a comparable MMC health plan in another state without a state-mandated PDL, controlling for sociodemographic confounders. A retrospective analysis with a pre-post design was conducted using deidentified administrative claims data from a large pharmacy benefit manager. The prepolicy evaluation period was January 1 through June 30, 2014, and the postpolicy period was January 1 through June 30, 2015. Continuously eligible Florida MMC plan members were matched on sociodemographic and health characteristics to their counterparts enrolled in a comparable MMC health plan in another state without a state-mandated formulary. Outcomes were drug use, measured as the number of 30-day adjusted nonspecialty drug prescriptions per member per period, and total drug plan costs per member per period for all drugs, with separate measures for generic and brand drugs. Bivariate comparisons were conducted using t-tests. Employing a difference-in-differences (DID) analytic approach, multivariate negative binomial regression and generalized estimating equation models were used to analyze prescription drug use and costs. The final analytical sample consisted of 18,372 enrollees, evenly divided between the 2 groups. In the postpolicy evaluation period, overall and generic use declined, while brand use increased for members in the Florida health plan. Drug costs, especially for brands, significantly increased for Florida health plan members. No significant changes were observed over the same time period in the control health plan members. DID analyses indicated that the decline in overall drug use was 6% lower (P = 0.020), and the increase in plan costs was 27% higher (P = 0.002) among Florida health plan members compared with control group members. Members in a Florida Medicaid health plan with a state-mandated PDL saw declines in overall and generic drug use and an increase in drug plan costs. States considering a state-mandated PDL should take into account potential effects of decreased generic drug use and increases in prescription drug plan costs. Funding for this study was provided internally by Express Scripts Holding Company. The authors and acknowledged contributors are employees of Express Scripts Holding Company. All authors contributed to the study concept, and study design was provided by Munshi, Mager, and Henderson. Munshi and Mager collected the data, and Munshi provided the statistical analysis. Data interpretation was performed by Munshi, Mager, and Henderson. The manuscript was written by Munshi, Henderson, and Mager and revised by Munshi, Ward, Mischel, and Henderson.
Tsofa, Benjamin; Molyneux, Sassy; Gilson, Lucy; Goodman, Catherine
2017-09-15
A common challenge for health sector planning and budgeting has been the misalignment between policies, technical planning and budgetary allocation; and inadequate community involvement in priority setting. Health system decentralisation has often been promoted to address health sector planning and budgeting challenges through promoting community participation, accountability, and technical efficiency in resource management. In 2010, Kenya passed a new constitution that introduced 47 semi-autonomous devolved county governments, and a substantial transfer of responsibility for healthcare from the central government to these counties. This study analysed the effects of this major political decentralization on health sector planning, budgeting and overall financial management at county level. We used a qualitative, case study design focusing on Kilifi County, and were guided by a conceptual framework which drew on decentralisation and policy analysis theories. Qualitative data were collected through document reviews, key informant interviews, and participant and non-participant observations conducted over an eighteen months' period. We found that the implementation of devolution created an opportunity for local level prioritisation and community involvement in health sector planning and budgeting hence increasing opportunities for equity in local level resource allocation. However, this opportunity was not harnessed due to accelerated transfer of functions to counties before county level capacity had been established to undertake the decentralised functions. We also observed some indication of re-centralisation of financial management from health facility to county level. We conclude by arguing that, to enhance the benefits of decentralised health systems, resource allocation, priority setting and financial management functions between central and decentralised units are guided by considerations around decision space, organisational structure and capacity, and accountability. In acknowledging the political nature of decentralisation polices, we recommend that health sector policy actors develop a broad understanding of the countries' political context when designing and implementing technical strategies for health sector decentralisation.
Modeling Off-Nominal Recovery in NextGen Terminal-Area Operations
NASA Technical Reports Server (NTRS)
Callantine, Todd J.
2011-01-01
Robust schedule-based arrival management requires efficient recovery from off-nominal situations. This paper presents research on modeling off-nominal situations and plans for recovering from them using TRAC, a route/airspace design, fast-time simulation, and analysis tool for studying NextGen trajectory-based operations. The paper provides an overview of a schedule-based arrival-management concept and supporting controller tools, then describes TRAC implementations of methods for constructing off-nominal scenarios, generating trajectory options to meet scheduling constraints, and automatically producing recovery plans.
NASA Astrophysics Data System (ADS)
Saadé-Sbeih, Myriam; Zwahlen, François; Haj Asaad, Ahmed; Gonzalez, Raoul; Jaubert, Ronald
2016-10-01
Water management is a fundamental issue in post-conflict planning in Syria. Based on historical water balance assessment, this study identifies the drivers of the profound changes that took place in the Lebanese and Syrian parts of the Orontes River basin since the 1930s. Both drastic effects of the conflict on the hydro-system and the strong uncontrolled anthropization of the river basin prior to the crisis have to be considered in the design of recovery interventions.
Kerridge, Joanna
National initiatives have outlined the importance of involving frontline staff in service improvement, and the ability to influence and manage change has been identified as an essential skill for delivering new models of care. Nurses often have to take the lead in managing change in clinical practice. The second in a three-part series is designed to help nurses at all levels develop the knowledge and skills to function as change agents within their organisations. This article focuses on planning the change and dealing with resistance.
Leachate management design in Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lange, D.A.; Broscious, J.C.; Zullo, E.G.
1996-02-01
As part of a project to provide solid waste master plans for 25 cities in Mexico, an American engineering firm, Paul C. Rizzo Associates (Monroeville, Pa.), was contracted to design a comprehensive leachate management system for landfills in the chosen cities. The solid waste master plan project was administered by the Mexican federal government Secretaria de Desarrollo Social (SEDESOL) with funding from the World Bank. While Paul C. Rizzo was the prime contractor for the project, which was completed in 1994, work was also subcontracted to a local Mexican engineering firm. The lack of specific design criteria for leachate managementmore » in current Mexican regulations enabled the use of a creative design for the system based on experience and technical judgment. Important design considerations included the current, primitive open-dump/burning/scavenging method of disposal and recycling of wastes, and the need for a minimal-cost solution in this developing country. The economic situation made the need for minimal expenditures to upgrade infrastructure equally important. The purpose of the design effort was to use evaporation and recirculation methods of landfill leachate management to minimize the amount of leachate that required treatment. Engineers in the project sought an ultimate goal of achieving zero excess leachate at the landfill sites.« less
[Planning a Health Residence for Prison Security Measures, Tuscany (Italy)].
Porfido, Eugenio; Colombai, Renato; Scarpa, Franco; Totaro, Michele; Tani, Luca; Baldini, Claudio; Baggiani, Angelo
2016-01-01
Health Residences for Prison Security Measures are facilities hosting psychotic persons who have committed crimes and providing them with personalized rehabilitation and treatment plans to promote their reinstatement in society. The aim of this study was to describe the criteria for planning and designing a prison health residence in the Tuscany region (Italy), to be managed by the regional healthcare service, in line with current regulations, with dedicated staff for providing specific treatment plans and programmes.
Health Games: A Key Component for the Evolution of Wellness Programs.
Lenihan, David
2012-06-01
Healthcare cost growth has been a major concern for both governments and employers. Considerable efforts have been made to "bend the trend" or find ways to control costs. At the highest levels, this has been the move from indemnity care models to managed care and then to consumer-directed health models using Healthcare Reimbursement Accounts and Healthcare Spending Accounts in plan designs. Accompanying this move in plan design has been an effort to get the consumer/patient/employee more engaged and responsible for his or her health expenditures, health decision-making, and activities. Consumers have gone through the phases of health being doctor-centric (indemnity care model), to health plan-centric (managed care models), to consumer-centric (consumer-directed health models). There is currently a need to incorporate wellness into the equation. Simply put, wellness is intended to keep people out of the health system by reducing the risk factors that would put them into the system in the first place. This includes things like smoking cessation, exercise, weight management, nutrition, and other factors over which individuals have a significant level of control over, as well as condition management such as medication adherence, and condition monitoring (such as glucose monitoring for diabetics). Wellness will become increasingly more common for major buyers, initially large self-funded employers and then health plans that will offer it as a part of their overall Plan Design and Administration services. Wellness initiatives will also be offered by Federal and State governments and will include programs for the elderly and at-risk populations as well as for the general population. The measure of success of wellness programs to actually "bend the trend" will be engagement. How large a piece of the population can be captured and retained will be the critical metric for success…and metrics require real data and will be used by the entire healthcare value-chain to measure efficacy and efficiency of "wellness spending."
[Infrastructure and contents of clinical data management plan].
Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei
2015-11-01
Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality.
The Mechanization of Design and Manufacturing.
ERIC Educational Resources Information Center
Gunn, Thomas G.
1982-01-01
Describes changes in the design of products and in planning, managing, and coordinating their manufacture. Focuses on discrete-products manufacturing industries, encompassing the fabrication and assembly of automobiles, aircraft, computers and microelectric components of computers, furniture, appliances, foods, clothing, building materials, and…
The "Total Immersion" Meeting Environment.
ERIC Educational Resources Information Center
Finkel, Coleman
1980-01-01
The designing of intelligently planned meeting facilities can aid management communication and learning. The author examines the psychology of meeting attendance; architectural considerations (lighting, windows, color, etc.); design elements and learning modes (furniture, walls, audiovisuals, materials); and the idea of "total immersion meeting…
Implementing program-wide awareness about recovery in a large mental health and addictions program.
McVanel-Viney, Sarah; Younger, Jodi; Doyle, Winnie; Kirkpatrick, Helen
2006-01-01
St. Joseph's Healthcare Hamilton conceptualized a multi-step plan for implementing a recovery oriented service delivery approach within their Mental Health and Addictions Program. This brief report discusses the first phase of this plan which included building awareness of recovery utilizing Anthony's (2000) system standards to develop a needs assessment for managers and senior team members. The survey had three purposes: to increase managers' awareness about recovery; to allow managers to express concerns that they had with this paradigm; and to afford managers an opportunity to explore the ways in which their service was and was not operating in a recovery oriented way. Initiatives designed to build awareness throughout the program are discussed.
China's quest for management of academic medicine.
Butler, W T; Ruma, S J
1990-08-01
The China Medical Board organized a management conference for the presidents of China's national medical universities. A three-person consulting team arranged by the Association of American Medical Colleges led the conference. Designed as a preliminary examination of the management problems faced by the national medical universities, the conference covered content similar to that of the AAMC Executive Development Seminars, including governance, financial management, faculty practice plans, technology transfer, information management, and organizational diagnosis. China's national medical universities are strategically managed by the Ministry of Public Health in Beijing, and for several years the ministry has increasingly decentralized the management and operational planning and control of these universities. The universities do not have enough properly trained personnel to absorb the additional management responsibilities, and the university presidents feel that they and their senior staffs need extensive training in adapting western-style management principles and practice to the Chinese setting.
Overview of the Integrated Programs for Aerospace Vehicle Design (IPAD) project
NASA Technical Reports Server (NTRS)
Venneri, S. L.
1983-01-01
To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of data base management technology and associated software for integrated company wide management of engineering and manufacturing information. Results to date on the IPAD project include an in depth documentation of a representative design process for a large engineering project, the definition and design of computer aided design software needed to support that process, and the release of prototype software to manage engineering information. This paper provides an overview of the IPAD project and summarizes progress to date and future plans.
An inventory and monitoring plan for a Sonoran Desert ecosystem; Barry M. Goldwater Range-West
Villarreal, Miguel L.; van Riper, Charles; Lovich, Robert E.; Palmer, Robert L.; Nauman, Travis; Studd, Sarah E.; Drake, Sam; Rosenberg, Abigail S.; Malusa, Jim; Pearce, Ronald L.
2011-01-01
Marine Corps Air Station Yuma manages the Barry M. Goldwater Range-West, which encompasses approximately 2,800 square kilometers of Sonoran Desert habitat in southwestern Arizona. The Barry M. Goldwater Range is a major U.S. military installation designed as an air combat training location for the U.S. Marine Corps and U.S. Air Force, but it also includes some of the most pristine desert habitat in the United States. In an effort to ensure the long-term viability of this unique natural resource, the U.S. Geological Survey (USGS) has developed an Integrated Natural Resources Management Plan and Inventory and Monitoring Plan to guide natural resource management of the Barry M. Goldwater Range-West. This Inventory and Monitoring Plan provides a framework for long-term ecosystem monitoring on Barry M. Goldwater Range-West lands by identifying existing and potential threats to ecosystem function, prioritizing resources for monitoring, and providing information and protocols necessary to initiate a long-term ecosystem monitoring program. The Inventory and Monitoring Plan and related protocols were developed through extensive review of existing Sonoran Desert monitoring programs and monitoring literature and through a 2-day workshop with resource managers, monitoring experts, and other stakeholders. The Barry M. Goldwater Range-West Inventory and Monitoring Plan stresses the importance of regional monitoring partnerships and protocol standardization for understanding landscape-scale ecosystem changes in the Sonoran Desert; information and protocols contained within the plan may also be of interest to land managers engaged in large-scale ecosystem monitoring and adaptive management of other arid regions.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2012 CFR
2012-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
Have Your Computer Call My Computer.
ERIC Educational Resources Information Center
Carabi, Peter
1992-01-01
As more school systems adopt site-based management, local decision makers need greater access to all kinds of information. Microcomputer-based networks can help with classroom management, scheduling, student program design, counselor recommendations, and financial reporting operations. Administrators are provided with planning tips and a sample…
A Writing-Intensive Program for Teaching Retail Management.
ERIC Educational Resources Information Center
Darian, Jean C.; And Others
1992-01-01
Presents the writing-intensive design for a retailing management course developed by its instructor in accordance with writing-across-the-curriculum principles. Provides an overview of the semester-long project. Details project procedures for preparatory activities, field research, and writing the marketing plan. (SR)
7 CFR 650.24 - Scenic beauty (visual resource).
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning assistance to individual landowners, groups, units of government, and watershed and resource... management, access roads, critical area treatment; design and management of ponds, stream margins, odd areas..., erosion control, and recreation or wildlife uses be carried out with full attention to visual resource...