Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Planning documents: a business planning strategy.
Kaehrle, P A
2000-06-01
Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.
Solid waste information and tracking system client-server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
May, D.L.
1998-04-15
This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
An Inventory of Documents on Educational Planning and Management in Asia and the Pacific.
ERIC Educational Resources Information Center
Mellor, Warren L., Ed.
This document comprises a UNESCO-sponsored inventory of documents on educational planning and management in Asia and the Pacific. The database consists of 714 documents from participating countries, divided into 10 subsections by country and indexed according to author and subject. The main entries are grouped alphabetically by country, as…
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
Dodge, Kent A.; Lambing, John H.
2006-01-01
A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.
Data management and processing plan, Department of Applied Geodesy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-08-01
This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.
Rhode Island congestion management plan : executive summary
DOT National Transportation Integrated Search
1997-09-01
This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...
Information security management system planning for CBRN facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.
The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the second of five volumes of the Information System Life-Cycle and Documentation Standards. This volume provides a well-organized, easily used standard for management plans used in acquiring, assuring, and developing information systems and software, hardware, and operational procedures components, and related processes.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.
This document abstracts and reviews 32 publications that describe population education programs developed for Asia and the Pacific region. The documents are grouped under three sections: (1) management; (2) planning; and (3) monitoring/evaluation. Section 1 consists of 12 selected titles that deal with management of population education programs.…
DOT National Transportation Integrated Search
2003-10-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...
76 FR 53149 - North American Waterfowl Management Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-25
... fundamental objectives for waterfowl management from a list of 31 candidate objectives. During Round Two... American Waterfowl Management Plan AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document... availability of the draft North American Waterfowl Management Plan Revision (draft Plan Revision) for public...
Region 7 Quality Management Plan
To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.
DOT National Transportation Integrated Search
2004-01-01
The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...
Suicide Management Plan--Post Suicide Response.
ERIC Educational Resources Information Center
Imhoff, Robert; Royster, Sharon
This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…
NASA software documentation standard software engineering program
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
Government Materials on Enrollment Management and Planning in Higher Education: A Resource Guide.
ERIC Educational Resources Information Center
Lewis, David G.
The guide is intended to provide admissions directors, academic deans, institutional planning officers, and faculty with access to government sources of information concerning college enrollment management. Sections provide information on: using the guide; additional government document information sources; using government documents; acquiring…
Legislative Framework for Landscape Planning in Latvia
NASA Astrophysics Data System (ADS)
Nitavska, Natalija; Zigmunde, Daiga
2017-10-01
With the adoption and the ratification of the European Landscape Convention a legally justified need for a clear landscape policy was grounded in the European countries. It includes the elaboration of the new and the improvement of the existing legislative documents on landscape planning, protection and management. The aim of the particular study is to analyse the existing legislative documents in Latvia influencing landscape planning on different scales / and the implementation of the European Landscape Convention. The study emphasizes the complex structure of the Latvian legislative framework affected by the distribution of the normative documents under the various ministries. Therefore, the main problem is unclear responsibility levels and organizational system for solving the issues regarding landscape planning, protection and management. Thus the various discussions between the involved disciplines and responsible institutions are arising. Two groups of the legislative documents influencing the implementation of the landscape policy in Latvia are detected within the study. The first group is strategic documents determining main landscape planning principles and directions at European, national, regional and professional or sectoral level. The second group is operational documents providing a set of actions for the landscape planning, protection and management at the local or the municipality level. The study concludes that operational documents developed by the municipalities are in high importance because of their direct influence on the landscape planning in Latvia. This often leads to the different landscape planning requirements included in the normative documents of the neighbouring municipalities, although the spatial and ecological borders of the visual landscape do not fit with the formal borders of the municipalities. Thus, it is essential to develop the common principles and actions that would be incumbent on all municipalities to provide the landscape integrity and to protect its values according to the main principles defined in the European Landscape Convention.
30 CFR 254.4 - May I reference other documents in my response plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false May I reference other documents in my response plan? 254.4 Section 254.4 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR... May I reference other documents in my response plan? You may reference information contained in other...
77 FR 44144 - National Forest System Land Management Planning; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-27
... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendments. SUMMARY: The Department of Agriculture (USDA) published a National Forest System land management planning rule in the... document may be sent to the Director, Ecosystem Management Coordination Staff, USDA Forest Service, 1400...
Solid Waste Information and Tracking System Client Server Conversion Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
GLASSCOCK, J.A.
2000-02-10
The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion
FY 2016 - Stockpile Stewardship and Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-03-01
This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.
NASA Technical Reports Server (NTRS)
Nichol, Janet; King, Bruce; Xiaoli, Ding; Dowman, Ian; Quattrochi, Dale; Ehlers, Manfred
2007-01-01
A policy document on earth observation for urban planning and management resulting from a workshop held in Hong Kong in November 2006 is presented. The aim of the workshop was to provide a forum for researchers and scientists specializing in earth observation to interact with practitioners working in different aspects of city planning, in a complex and dynamic city, Hong Kong. A summary of the current state of the art, limitations, and recommendations for the use of earth observation in urban areas is presented here as a policy document.
DOT National Transportation Integrated Search
2004-03-03
The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kaloko-Honokohau Historic Park pursuant to the National Parks Air Tour Management ...
Recommended HSE-7 documents hierarchy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klein, R.B.; Jennrich, E.A.; Lund, D.M.
1990-12-12
This report recommends a hierarchy of waste management documents at Los Alamos National Laboratory (LANL or Laboratory''). The hierarchy addresses documents that are required to plan, implement, and document waste management programs at Los Alamos. These documents will enable the waste management group and the six sections contained within that group to satisfy requirements that are imposed upon them by the US Department of Energy (DOE), DOE Albuquerque Operations, US Environmental Protection Agency, various State of New Mexico agencies, and Laboratory management.
Recommended HSE-7 documents hierarchy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klein, R.B.; Jennrich, E.A.; Lund, D.M.
1990-12-12
This report recommends a hierarchy of waste management documents at Los Alamos National Laboratory (LANL or ``Laboratory``). The hierarchy addresses documents that are required to plan, implement, and document waste management programs at Los Alamos. These documents will enable the waste management group and the six sections contained within that group to satisfy requirements that are imposed upon them by the US Department of Energy (DOE), DOE Albuquerque Operations, US Environmental Protection Agency, various State of New Mexico agencies, and Laboratory management.
Document Management in Local Government.
ERIC Educational Resources Information Center
Williams, Bernard J. S.
1998-01-01
The latest in electronic document management in British local government is discussed. Finance, revenues, and benefits systems of leading vendors to local authorities are highlighted. A planning decisions archive management system and other information services are discussed. (AEF)
Hallett, Nutmeg; Huber, Jörg W; Sixsmith, Judith; Dickens, Geoffrey L
2016-12-01
This paper describes an audit of prevention and management of violence and aggression care plans and incident reporting forms which aimed to: (i) report the compliance rate of completion of care plans; (ii) identify the extent to which patients contribute to and agree with their care plan; (iii) describe de-escalation methods documented in care plans; and (iv) ascertain the extent to which the de-escalation methods described in the care plan are recorded as having been attempted in the event of an incident. Care plans and incident report forms were examined for all patients in men's and women's mental health care pathways who were involved in aggressive incidents between May and October 2012. In total, 539 incidents were examined, involving 147 patients and 121 care plans. There was no care plan in place at the time of 151 incidents giving a compliance rate of 72%. It was documented that 40% of patients had contributed to their care plans. Thematic analysis of de-escalation methods documented in the care plans revealed five de-escalation themes: staff interventions, interactions, space/quiet, activities and patient strategies/skills. A sixth category, coercive strategies, was also documented. Evidence of adherence to de-escalation elements of the care plan was documented in 58% of incidents. The reasons for the low compliance rate and very low documentation of patient involvement need further investigation. The inclusion of coercive strategies within de-escalation documentation suggests that some staff fundamentally misunderstand de-escalation. © 2016 Australian College of Mental Health Nurses Inc.
DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
NASA Technical Reports Server (NTRS)
Jester, Peggy L.; Hancock, David W., III
1999-01-01
This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... Statement for the General Management Plan (DEIS/GMP), Canaveral National Seashore, FL AGENCY: National Park... General Management Plan (DEIS/GMP), Canaveral National Seashore (Seashore). SUMMARY: Pursuant to 42 U.S.C... DEIS/GMP for Canaveral National Seashore, Florida. The document provides a framework for management...
Asset Management Plans, Appraisal Guidance for 2003-04.
ERIC Educational Resources Information Center
Department for Education and Skills, London (England).
This document is one in a series which aims to assist Local Authorities in Britain with asset management planning (AMPs) for schools. AMPs set out the information needed, and the criteria used, to make decisions about spending on school premises. The document provides guidance on the appraisal of school AMPs in 2002 to inform 3-year formulaic…
NIF Operations Management Plan, August 2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Wonterghem, Bruno M.
Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in themore » laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.« less
Decoupling the use and meaning of strategic plans in public healthcare
2013-01-01
Background The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? Methods An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. Results The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. Conclusions The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities. PMID:23289527
Decoupling the use and meaning of strategic plans in public healthcare.
Lega, Federico; Longo, Francesco; Rotolo, Andrea
2013-01-04
The culture of New Public Management has promoted the diffusion of strategic management tools throughout Public Healthcare Organisations (PHOs). There is consensus that better strategic planning tools are required to achieve higher levels of organisational performance. This paper provides evidence and understanding of the emergent uses and scope of strategic planning in PHOs, in order to answer three research questions: (i) has the New Public Management approach changed the organisational culture of PHOs in terms of how they adopt, diffuse, and use strategic planning documents? (ii) how coherent are strategic planning documents in PHOs? and (iii) what are the main purposes of strategic documents in PHOs? An analysis was carried out in three Italian Local Health Authorities. We analysed the number and types of formal strategic documents adopted between 2004 and 2012, evaluating their degree of coherence and coordination, their hierarchy, their degree of disclosure, and the consistency of their strategic goals. A content analysis was performed to investigate overlap in terms of content and focus, and a qualitative analysis was carried out to study and represent the relationships between documents. The analysis showed that a rich set of strategic documents were adopted by each PHO. However, these are often uncoordinated and overlap in terms of content. They adopt different language and formats for various stakeholders. The presence of diverse external drivers may explain the divergent focus, priorities and inconsistent goals in the strategic documents. This planning complexity makes it difficult to determine how the overall goals and mission of an organisation are defined and made visible. The evidence suggests that PHOs use a considerable number of strategic documents. However, they employ no clear or explicit overarching strategy currently, and strategic planning appears to be externally oriented. All the documents communicate similar topics to different stakeholders, although they use different language to answer to the different expectations of each stakeholder. Therefore, strategic planning and plans seem to be driven by neo-institutional approaches, as they are means to build consensus and negotiate ground for strategic actions, rather than means to identify strategic choices and priorities.
2004-07-01
sampler, project manager, data reviewer, statistician , risk assessor, assessment personnel, and laboratory QC manager. In addition, a complete copy of...sample • Corrective actions to be taken if the QC sample fails these criteria • A description of how the QC data and results are to be documented and...Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Evaluating, Assessing, and Documenting
EPA Guidance for Geospatially Related Quality Assurance Project Plans
This March 2003 document discusses EPA's Quality Assurance (QA) Project Plan as a tool for project managers and planners to document the type and quality of data and information needed for making environmental decisions
Software Management Environment (SME): Components and algorithms
NASA Technical Reports Server (NTRS)
Hendrick, Robert; Kistler, David; Valett, Jon
1994-01-01
This document presents the components and algorithms of the Software Management Environment (SME), a management tool developed for the Software Engineering Branch (Code 552) of the Flight Dynamics Division (FDD) of the Goddard Space Flight Center (GSFC). The SME provides an integrated set of visually oriented experienced-based tools that can assist software development managers in managing and planning software development projects. This document describes and illustrates the analysis functions that underlie the SME's project monitoring, estimation, and planning tools. 'SME Components and Algorithms' is a companion reference to 'SME Concepts and Architecture' and 'Software Engineering Laboratory (SEL) Relationships, Models, and Management Rules.'
Haleakala National Park Air Tour Management Plan: Planning and NEPA Scoping Document
DOT National Transportation Integrated Search
2004-03-03
The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of Air Tour Management Plans (ATMPs) for Haleakala National Park, Hawaii Volcanoes National Park and Kalaupapa National Hist...
NASA Software Documentation Standard
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
Hawaii Volcanoes National Park Air Tour Management Plan: Planning and NEPA Scoping Document
DOT National Transportation Integrated Search
2004-03-03
The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of Air Tour Management Plans (ATMPs) for Haleakala National Park, Hawaii Volcanoes National Park, Puukohola Heiau National H...
USDOT guidance summary for connected vehicle deployments : safety management.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...
Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.
2014-01-01
As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.
Contingency Management Requirements Document: Preliminary Version. Revision F
NASA Technical Reports Server (NTRS)
2005-01-01
This is the High Altitude, Long Endurance (HALE) Remotely Operated Aircraft (ROA) Contingency Management (CM) Functional Requirements document. This document applies to HALE ROA operating within the National Airspace System (NAS) limited at this time to enroute operations above 43,000 feet (defined as Step 1 of the Access 5 project, sponsored by the National Aeronautics and Space Administration). A contingency is an unforeseen event requiring a response. The unforeseen event may be an emergency, an incident, a deviation, or an observation. Contingency Management (CM) is the process of evaluating the event, deciding on the proper course of action (a plan), and successfully executing the plan.
Sybill Amelon; Robert T. Brooks; Jessie Glaeser; Megan Friggens; Daniel Lindner; Susan C. Loeb; Ann Lynch; Drew Minnis; Roger Perry; Mary M. Rowland; Monica Tomosy; Ted Weller
2012-01-01
The National Plan for Assisting States, Federal Agencies, and Tribes in Managing White-Nose Syndrome in Bats (National WNS Plan), is a document prepared jointly by the U.S. Departments of the Interior, Agriculture, and Defense, along with the Association of Fish and Wildlife Agencies. This document provides a strategic framework for the investigation and management of...
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan
DOT National Transportation Integrated Search
2017-10-17
This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...
Code of Federal Regulations, 2010 CFR
2010-07-01
... pursuant to the provisions of this subpart. Comprehensive Management Plan is the document that establishes... Wallowa-Whitman National Forest Land and Resource Management Plan. Cultural resources means historic and... ecosystem approach to management being a primary consideration. Suitable means it is appropriate to apply...
0-6683 : develop a pavement project evaluation index to support the 4-year pavement management plan.
DOT National Transportation Integrated Search
2013-08-01
A pavement management plan (PMP) identifies : candidate maintenance and rehabilitation (M&R) : projects for a particular roadway network over a : multi-year planning period. The PMP is a living : document because projects are reevaluated and : reprio...
Congestion Management System Process Report
DOT National Transportation Integrated Search
1996-03-01
In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...
40 CFR 262.214 - Laboratory management plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...
40 CFR 262.214 - Laboratory management plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...
40 CFR 262.214 - Laboratory management plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...
Clean Air Act Section 112(r) Inspection Guidance Distribution Memorandum
This memorandum issues and makes immediately effective the document, Guidance for Conducting Risk Management Program Inspections under Clean Air Act Section 112(r), which supersedes the 1999 document on auditing risk management plans/programs.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
...Pursuant to 42 U.S.C. 4332(2)(C) of the National Environmental Policy Act of 1969 and National Park Service (NPS) policy in Director's Order Number 2 (Park Planning) and Director's Order Number 12 (Conservation Planning, Environmental Impact Analysis, and Decision- making) the NPS announces the availability of a DEIS/GMP for Buck Island Reef National Monument, Virgin Islands. The document provides a framework for management, use, and development options for Buck Island Reef National Monument by the NPS for the next 15 to 20 years. It describes four management alternatives for consideration, including a No-Action Alternative that continues current management policies and the NPS's preferred alternative. The document analyzes the environmental impacts of the alternatives.
LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Noonan, Christine F.; Henry, Michael J.; Corley, Courtney D.
2014-01-14
The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this documentmore » to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-09
... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket... for Exploration Plans, Development and Production Plans, and Development Operations Coordination Documents on the OCS NTL, Renewal of a Collection; Submitted for Office of Management and Budget (OMB...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... Documents Access and Management System (ADAMS): You may access publicly available documents online in the... Management Plans for Digital Computer Software used in Safety Systems of Nuclear Power Plants,'' issued for... Used in Safety Systems of Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Revision...
49 CFR 633.25 - Contents of a project management plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
...; (e) A change order procedure which includes a documented, systematic approach to the handling of... covering the project management organization, appropriate consultants, property acquisition, utility... 49 Transportation 7 2011-10-01 2011-10-01 false Contents of a project management plan. 633.25...
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
Non-Profit/Higher Education Project Management Series: The Project Plan
ERIC Educational Resources Information Center
Burgher, Karl E.; Snyder, Michael
2012-01-01
This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department`s mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE`s new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department`s commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM`s efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE`s commitment to the culture change by involving the general public in its development.« less
'Take Ten' improving the surgical post-take ward round: a quality improvement project.
Banfield, Danielle Alice; Adamson, Carly; Tomsett, Amy; Povey, James; Fordham, Tony; Richards, Sarah Kathryn
2018-01-01
The surgical post-take ward round is a complex multidisciplinary interaction in which new surgical patients are reviewed and management plans formulated. Its fast-paced nature can lead to poor communication and inaccurate or incomplete documentation with potential detriment to patient safety. Junior team members often do not fully understand the diagnosis and management plan. The aims of this project were to improve both communication and documentation on the surgical post-take ward round, influencing patient safety. The ward round was deconstructed to identify individual roles and determine where intervention would have the most impact. Ten important points were identified that should be documented in the management of an acute surgical patient; observations, examination, impression, investigations, antibiotics, intravenous fluids, VTE assessment, nutrition status, estimated length of stay and ceiling of treatment. A 'Take Ten' checklist was devised with these items to be used as a 'time out' after each patient with the whole team for discussion, clarification and clear documentation. Four plan do study act cycles were completed over a period of a year. A retrospective review of post-take documentation preintervention and postintervention was performed, and the percentage of points that were accurately documented was calculated. For further clarification, 2 weekends were compared-one where the checklist was used and one where it was not. Results showed documentation postintervention varied between categories but there was improvement in documentation of VTE assessment, fluids, observations and investigations. On direct comparison of weekends the checklist showed improved documentation in all categories except length of stay. Junior team members found the checklist improved understanding of diagnosis and management plan, and encouraged a more effective ward round. The 'Take Ten' checklist has been well received. Three years on from its inception, the checklist has become an integral part of the post-take ward round, thanks to the multidisciplinary engagement in the project.
DOT National Transportation Integrated Search
2004-04-19
The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Lake Mead National Recreation Area (LAME) pursuant to the National Parks Air Tour ...
Digital document imaging systems: An overview and guide
NASA Technical Reports Server (NTRS)
1990-01-01
This is an aid to NASA managers in planning the selection of a Digital Document Imaging System (DDIS) as a possible solution for document information processing and storage. Intended to serve as a manager's guide, this document contains basic information on digital imaging systems, technology, equipment standards, issues of interoperability and interconnectivity, and issues related to selecting appropriate imaging equipment based upon well defined needs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
Water Management Plan for Fort Buchanan, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine
2004-06-01
This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Winning performance improvement strategies--linking documentation and accounts receivable.
Braden, J H; Swadley, D
1996-01-01
When the HIM department at The University of Texas Medical Branch set out to improve documentation and accounts receivable management, it established a plan that encompassed a broad spectrum of data management process changes. The department examined and acknowledged the deficiencies in data management processes and used performance improvement tools to achieve successful results.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
..., and Butterfish Fishery Management Plan (MSB FMP), which was developed and adopted by the Mid-Atlantic Fishery Management Council and submitted to NMFS for approval. This action proposes broadening the scope... supporting documents used by the Mid-Atlantic Fishery Management Council, including the Framework Document...
40 CFR 230.94 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...
40 CFR 230.94 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...
40 CFR 230.94 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...
40 CFR 230.94 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and...
36 CFR 219.54 - Filing an objection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... or regulation. (2) Forest Service Directive System documents and land management plans or other... the objection process. (b) Including documents by reference is not allowed, except for the following... relevant section of the cited document. All other documents or Web links to those documents, or both must...
36 CFR 219.54 - Filing an objection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... or regulation. (2) Forest Service Directive System documents and land management plans or other... the objection process. (b) Including documents by reference is not allowed, except for the following... relevant section of the cited document. All other documents or Web links to those documents, or both must...
ERIC Educational Resources Information Center
Kirchner, Charles, Ed.
This document identifies the information that should be included in a business plan, and in what order, to make it an effective management tool and an effective tool to communicate a proposed or existing company's strengths and potential to potential financiers. Following an introduction, the document explains the following sections of a business…
Guidance and Control Software Project Data - Volume 1: Planning Documents
NASA Technical Reports Server (NTRS)
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
Connected vehicle pilot deployment program phase 1, safety management plan – Tampa (THEA).
DOT National Transportation Integrated Search
2016-04-01
This document presents the Safety Management Plan for the THEA Connected Vehicle (CV) Pilot Deployment. The THEA CV Pilot Deployment goal is to advance and enable safe, interoperable, networked wireless communications among vehicles, the infrastructu...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department's mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE's new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department's commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM's efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE's commitment to the culture change by involving the general public in its development.« less
Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, J.W.
1993-12-01
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY)more » 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.
Integrated Baseline System (IBS), Version 1. 03. [Chemical Stockpile Emergency Preparedness Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bailey, B.M.; Burford, M.J.; Downing, T.R.
The Integrated Baseline System (IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planing and analysis. This document is the user guide for the IBS and explains how to operate the IBS system. The fundamental function of the IBS is to provide tools that civilian emergency management personnel can use in developing emergency plans and in supporting emergency management activities to cope with a chemical-releasing event at a military chemical stockpile. Emergency management planners can evaluate concepts and ideas using the IBS system. The results of that experience can then be factoredmore » into refining requirements and plans. This document provides information for the general system user, and is the primary reference for the system features of the IBS. It is designed for persons who are familiar with general emergency management concepts, operations, and vocabulary. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other LBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary. IBS is a dynamic system. Its capabilities are in a state of continuing expansion and enhancement.« less
Software Management Environment (SME) concepts and architecture, revision 1
NASA Technical Reports Server (NTRS)
Hendrick, Robert; Kistler, David; Valett, Jon
1992-01-01
This document presents the concepts and architecture of the Software Management Environment (SME), developed for the Software Engineering Branch of the Flight Dynamic Division (FDD) of GSFC. The SME provides an integrated set of experience-based management tools that can assist software development managers in managing and planning flight dynamics software development projects. This document provides a high-level description of the types of information required to implement such an automated management tool.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan
1989-07-01
This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)
Strategic survey framework for the Northwest Forest Plan survey and manage program.
Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler
2003-01-01
This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...
The planning and control of NASA programs and resources
NASA Technical Reports Server (NTRS)
1983-01-01
The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.
NASA Technical Reports Server (NTRS)
Mckay, Charles
1991-01-01
This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.
Alvarado Flood Risk Management Modifications to Existing Project Section 408 Review. Review Plan
2012-12-26
Digital Flood Insurance Rate Maps) through the Nationa l Flood Insurance Program ( NFIP ). In order to obtain FEMA accreditation, the levee owner...compliance documentation for meeting NFIP requirements. Barr conducted a thorough review of relevant documents to gain a better understanding of...compliance documentation for meeting NFIP requirements. Barr Engineering has prepared a Phase I Engineer’s Report and is developing plans and
Sources and Information: Strategic Management.
ERIC Educational Resources Information Center
Palmer, Jim
1983-01-01
Provides an annotated bibliography of ERIC documents on strategic management, with emphasis on institutional responses to change, the role of the administrator in strategic management, budgeting and financial management, and institutional planning. (DMM)
Becker, CoraLynn; Bjornson, Darrel C; Kuhle, Julie W
2004-01-01
To document drug therapy problems and their causes and assess pharmacist follow-up of patients with identified drug therapy problems. Cross-sectional analysis. Iowa. 160 pharmacists who submitted 754 pharmaceutical care plans in an effort to qualify for participation in the Iowa Pharmaceutical Case Management program. Care plans were assessed for drug therapy problems and causes and for documentation of pharmacist follow-up (actual, none, or intent to follow up). Pharmacists documented a wide variety of drug therapy problems and causes, including adverse drug reactions (20.1% of care plans), need for additional drug therapy (18.9%), lack of patient adherence to therapy (16.3%), incorrect medication being prescribed (14.1%), and drug dose too high (10.0%). Pharmacist follow-up with patients was not optimal, with 31% of care plans providing documentation of actual follow-up. Another 42.2% of plans indicated that the pharmacist intended to contact the patient for follow-up but either did not do so or did not record the intervention. No actual follow-up or intent to follow up was recorded in 26.8% of care plans. Pharmacists practicing in independent pharmacies followed up with patients more frequently than those in other settings (36.4% of care plans, compared with 22.7%, 23.2%, and 28.4% for chain, clinic, and franchise pharmacies). Pharmacists were more likely to follow up when the identified problem involved drug safety rather than effectiveness (36.2% versus 28.3% of care plans). Documentation of pharmacist follow-up with patients was less than optimal. In addition to identifying drug therapy problems and causes, pharmacists must complete the care continuum through documentation of patient monitoring and follow-up to transform the philosophy and vision of the pharmaceutical care concept into a practice of pharmacy recognized and rewarded by patients and payers.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for child care and guidance management and services I and II. Presented first…
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
Development Plans in Turkey and a Managerial Analysis on Education (1963-2013 Years)
ERIC Educational Resources Information Center
Çakir, Rahman
2015-01-01
The purpose of this study is that to evaluate nine educational management plans between the years 1963-2013 and one plan in the process of implementation educational management. Document analysis technique from the qualitative research methods was used in this research. Data was analyzed as three stages: description, analysis and interpretation.…
29 CFR 2520.102-3 - Contents of summary plan description.
Code of Federal Regulations, 2010 CFR
2010-07-01
... document that accompanies the plan's SPD, provided that the document satisfies the style and format... descriptive provisions in addition to those prescribed in paragraph (t)(2) of this section. However, the style... Office of Management and Budget under control number 1210-0039) [42 FR 37180, July 19, 1977, as amended...
Software Management Environment (SME) installation guide
NASA Technical Reports Server (NTRS)
Kistler, David; Jeletic, Kellyann
1992-01-01
This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.
77 FR 37672 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... EIS, NOAA, AS, Fagatele Bay National Marine Sanctuary Management Plan, Implementation, Tutuila Island.... 20120195, Draft EIS, NPS, FL, Fort Matanzas National Monument General Management Plan, Implementation, St... filing documents online and providing feedback on the process. To participate in the pilot, register at...
Code of Federal Regulations, 2011 CFR
2011-01-01
... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...
Code of Federal Regulations, 2010 CFR
2010-01-01
... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...
Strategic Planning for Management Information Systems.
ERIC Educational Resources Information Center
Ein-Dor, Phillip; Segev, Eli
1978-01-01
Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)
Recommendations for Emergency Management Planning for School Facilities.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
Numerous events, such as hurricanes, floods, and tornadoes, constitute a natural disaster for public schools. Human-caused disasters include hazardous-material emergencies, civil riots, fires, and nuclear accidents. This document contains emergency-management planning guidelines, developed by the Texas Education Agency, to help local school…
ERIC Educational Resources Information Center
Bray, Mark; Atchoarena, David
Part of Round Table IV, this document consists of two articles presented at an international congress in Mexico. Each deals with planning and management of education in small countries. The purpose of the congress was to review the evolution of educational planning and management since a previous conference held in 1968. The participants hoped to…
Electronic Document Management Systems: Where Are They Today?
ERIC Educational Resources Information Center
Koulopoulos, Thomas M.; Frappaolo, Carl
1993-01-01
Discusses developments in document management systems based on a survey of over 400 corporations and government agencies. Text retrieval and imaging markets, architecture and integration, purchasing plans, and vendor market leaders are covered. Five graphs present data on user preferences for improvements. A sidebar article reviews the development…
Data Supporting Creation of Office of Communications Management.
ERIC Educational Resources Information Center
Turner, Alan
Designed to support the formation of a New York State Office of Communications Management, this document contains official recommendations, cost justifications, public hearing testimonies, and government documents which address the need for a statewide control of telecommunications. A year-long, 12-step plan for implementation of a State Office of…
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
NASA Technical Reports Server (NTRS)
2005-01-01
The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture business and management (ABM) I and II. Presented first are a…
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
DOT National Transportation Integrated Search
2008-06-23
This document presents the notes taken at the USDOT Integrated Corridor Management (ICM) Transit Data Gaps for Rail Transit Systems Initial Planning Workshop. Different scenarios for handling increased demand on rail and bus transit systems are discu...
Guidelines for Local Governments on Solid Waste Management.
ERIC Educational Resources Information Center
National Association of Counties, Washington, DC. Research Foundation.
This document consists of ten guides on Solid Waste Management to assist local elected and appointed policy-making officials. They are entitled: Areawide Approaches; Legal Authority, Planning, Organization Design and Operation, Financing, Technical and Financial Assistance, Citizen Support, Personnel, and Action Plan and Bibliography. The guides…
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bailey, B.M.; Burford, M.J.; Downing, T.R.
The Integrated Baseline System (IBS), operated by the Federal Emergency Management Agency (FEMA), is a system of computerized tools for emergency planing and analysis. This document is the user guide for the IBS and explains how to operate the IBS system. The fundamental function of the IBS is to provide tools that civilian emergency management personnel can use in developing emergency plans and in supporting emergency management activities to cope with a chemical-releasing event at a military chemical stockpile. Emergency management planners can evaluate concepts and ideas using the IBS system. The results of that experience can then be factoredmore » into refining requirements and plans. This document provides information for the general system user, and is the primary reference for the system features of the IBS. It is designed for persons who are familiar with general emergency management concepts, operations, and vocabulary. Although the IBS manual set covers basic and advanced operations, it is not a complete reference document set. Emergency situation modeling software in the IBS is supported by additional technical documents. Some of the other LBS software is commercial software for which more complete documentation is available. The IBS manuals reference such documentation where necessary. IBS is a dynamic system. Its capabilities are in a state of continuing expansion and enhancement.« less
Information Technology Resources Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
The Information Technology Resources Assessment (ITRA) is being published as a companion document to the Department of Energy (DOE) FY 1994--FY 1998 Information Resources Management Long-Range Plan. This document represents a collaborative effort between the Office of Information Resources Management and the Office of Energy Research that was undertaken to achieve, in part, the Technology Strategic Objective of IRM Vision 21. An integral part of this objective, technology forecasting provides an understanding of the information technology horizon and presents a perspective and focus on technologies of particular interest to DOE program activities. Specifically, this document provides site planners with anmore » overview of the status and use of new information technology for their planning consideration.« less
Semantic Metadata for Heterogeneous Spatial Planning Documents
NASA Astrophysics Data System (ADS)
Iwaniak, A.; Kaczmarek, I.; Łukowicz, J.; Strzelecki, M.; Coetzee, S.; Paluszyński, W.
2016-09-01
Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa). The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less
Planning and Time Management: Keys to Effective Educational Leadership.
ERIC Educational Resources Information Center
Sergiovanni, Thomas J.
1980-01-01
Educational administrators' concern with planning and time management results from the fragmentation of their daily activities, which research has documented, and their consequent search for order and control. Time is important because its scarcity affects productivity and its use has social-psychological effects on staffs' perceptions of…
ERIC Educational Resources Information Center
Himes, Dottie
This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…
77 FR 22286 - Western Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
... Team (PPT) in Honolulu, HI to discuss fishery issues and develop recommendations for future management... and Central Pacific Fishery Commission 8. Other business 9. Public comment 10. Pelagic Plan Team... meetings. Plan Team action will be restricted to those issues specifically listed in this document and any...
Bibliography on Life/Career Planning.
ERIC Educational Resources Information Center
Snyder, Jane
Developed for use in a university life/career planning course, this bibliography applies the principles of business management to personal and occupational planning and career development. The first part of the document contains the model for life/career planning which includes student activities in decisionmaking, personal and environmental…
Spent nuclear fuel project high-level information management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Main, G.C.
1996-09-13
This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less
Guidelines clarify managed care accounting procedures.
Cheramy, S J; Garner, M
1989-08-01
Two new documents offer guidance for accounting issues involved in managed care programs. The American Institute of Certified Public Accountants' Statement of Position 89-5 and HFMA's Principles and Practices Board Statement No. 11 address risk contracting from the perspective of the managed care program and the healthcare provider, respectively. One key issue addressed in the documents is the timing of expense recognition of the costs of providing health services to members of managed care plans.
The Wildland Fire Decision Support System: Integrating science, technology, and fire management
Morgan Pence; Tom Zimmerman
2011-01-01
Federal agency policy requires documentation and analysis of all wildland fire response decisions. In the past, planning and decision documentation for fires were completed using multiple unconnected processes, yielding many limitations. In response, interagency fire management executives chartered the development of the Wildland Fire Decision Support System (WFDSS)....
Enrollment Management Strategies at Four-Year Open Enrollment Institutions of Higher Education
ERIC Educational Resources Information Center
Santoro, Dana S.
2017-01-01
Enrollment management plans have been researched and documented for the last fifty years and literature verifies that the use of these plans has only become more relevant in the 21st century. Strategies and activities for managing enrollment have been defined and shared for most types of institutions, however, there is limited research on the best…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental, LLC
2009-09-01
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less
Air Force Geophysics Laboratory Management Information System Study.
1985-11-01
management information system (MIS) at AFGL. The study summarizes current management and administrative practices at AFGL. Requirements have been identified for automating several currently manual functions to compile accurate and timely information to better manage and plan AFGL programs. This document describes the functions and relative priorities of five MIS subsystems and provides suggestions for implementation solutions. Creation of a detailed Development Plan is recommended as the follow-on task.
Guidelines for the development of a Project Data Management Plan (PDMP)
NASA Technical Reports Server (NTRS)
Green, James L.; King, Joseph H.
1988-01-01
The purpose of this document is to assist NASA Project personnel in the preparation of their Project Data Management Plans (PDMP) in accordance with NASA Management Instruction (NMI) 8030.3A. In addition, this report summarizes the scope of a PDMP and establishes important aspects that must be addressed for the long term management and archiving of the data from a NASA space flight investigation.
Some guidance on preparing validation plans for the DART Full System Models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy
2009-03-01
Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less
Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2012-10-24
This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less
Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)
NASA Technical Reports Server (NTRS)
1992-01-01
Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.
Hanford Site Groundwater Protection Management Program: Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Groundwater protection is a national priority that is promulgated in a variety of environmental regulations at local, state, and federal levels. To effectively coordinate and ensure compliance with applicable regulations, the US Department of Energy has issued DOE Order 5400.1 (now under revision) that requires all US Department of Energy facilities to prepare separate groundwater protection program descriptions and plans. This document describes the Groundwater Protection Management Program for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the Groundwater Protection Management Program cover the following general topical areas: (1) documentation of the groundwater regime,more » (2) design and implementation of a groundwater monitoring program to support resource management and comply with applicable laws and regulations, (3) a management program for groundwater protection and remediation, (4) a summary and identification of areas that may be contaminated with hazardous waste, (5) strategies for controlling these sources, (6) a remedial action program, and (7) decontamination and decommissioning and related remedial action requirements. Many of the above elements are covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing groundwater protection activities. Additionally, it describes how information needs are identified and can be incorporated into existing or proposed new programs. The Groundwater Protection Management Program provides the general scope, philosophy, and strategies for groundwater protection/management at the Hanford Site. Subtier documents provide the detailed plans for implementing groundwater-related activities and programs. Related schedule and budget information are provided in the 5-year plan for environmental restoration and waste management at the Hanford Site.« less
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France).
A major purpose of the Congress was to take stock of developments in the planning and management of education since the International Conference of Educational Planning (Paris 1968). Another was to identify new approaches and trends in the field in light of decisions adopted during the World Conference on Education for All (Jomtien, Thailand,…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
[Infrastructure and contents of clinical data management plan].
Shen, Tong; Xu, Lie-dong; Fu, Hai-jun; Liu, Yan; He, Jia; Chen, Ping-yan; Song, Yu-fei
2015-11-01
Establishment of quality management system (QMS) plays a critical role in the clinical data management (CDM). The objectives of CDM are to ensure the quality and integrity of the trial data. Thus, every stage or element that may impact the quality outcomes of clinical studies should be in the controlled manner, which is referred to the full life cycle of CDM associated with the data collection, handling and statistical analysis of trial data. Based on the QMS, this paper provides consensus on how to develop a compliant clinical data management plan (CDMP). According to the essential requirements of the CDM, the CDMP should encompass each process of data collection, data capture and cleaning, medical coding, data verification and reconciliation, database monitoring and management, external data transmission and integration, data documentation and data quality assurance and so on. Creating and following up data management plan in each designed data management steps, dynamically record systems used, actions taken, parties involved will build and confirm regulated data management processes, standard operational procedures and effective quality metrics in all data management activities. CDMP is one of most important data management documents that is the solid foundation for clinical data quality.
Waters, Keith P; Zuber, Alexandra; Willy, Rankesh M; Kiriinya, Rose N; Waudo, Agnes N; Oluoch, Tom; Kimani, Francis M; Riley, Patricia L
2013-09-01
Countries worldwide are challenged by health worker shortages, skill mix imbalances, and maldistribution. Human resources information systems (HRIS) are used to monitor and address these health workforce issues, but global understanding of such systems is minimal and baseline information regarding their scope and capability is practically non-existent. The Kenya Health Workforce Information System (KHWIS) has been identified as a promising example of a functioning HRIS. The objective of this paper is to document the impact of KHWIS data on human resources policy, planning and management. Sources for this study included semi-structured interviews with senior officials at Kenya's Ministry of Medical Services (MOMS), Ministry of Public Health and Sanitation (MOPHS), the Department of Nursing within MOMS, the Nursing Council of Kenya, Kenya Medical Practitioners and Dentists Board, Kenya's Clinical Officers Council, and Kenya Medical Laboratory Technicians and Technologists Board. Additionally, quantitative data were extracted from KHWIS databases to supplement the interviews. Health sector policy documents were retrieved from MOMS and MOPHS websites, and reviewed to assess whether they documented any changes to policy and practice as having been impacted by KHWIS data. Interviews with Kenyan government and regulatory officials cited health workforce data provided by KHWIS influenced policy, regulation, and management. Policy changes include extension of Kenya's age of mandatory civil service retirement from 55 to 60 years. Data retrieved from KHWIS document increased relicensing of professional nurses, midwives, medical practitioners and dentists, and interviewees reported this improved compliance raised professional regulatory body revenues. The review of Government records revealed few references to KHWIS; however, documentation specifically cited the KHWIS as having improved the availability of human resources for health information regarding workforce planning, management, and development. KHWIS data have impacted a range of improvements in health worker regulation, human resources management, and workforce policy and planning at Kenya's ministries of health. Published by Elsevier Ireland Ltd.
Planning for School Emergencies.
ERIC Educational Resources Information Center
Della-Giustina, Daniel E.
This document is designed to provide civil leaders and school administrators with a resource that will enable them to develop comprehensive contingency plans for specific emergency situations. A discussion of disaster and emergency management planning includes an outline of the objectives of emergency planning that were established for this guide.…
Software Management Environment (SME) release 9.4 user reference material
NASA Technical Reports Server (NTRS)
Hendrick, R.; Kistler, D.; Manter, K.
1992-01-01
This document contains user reference material for the Software Management Environment (SME) prototype, developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division (FDD) of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides an overview of the SME, a description of all functions, and detailed instructions concerning the software's installation and use.
Management of technical date in Nihon Doro kodan
NASA Astrophysics Data System (ADS)
Hanada, Jun'ichi
Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.
ERIC Educational Resources Information Center
Bruley, Karina
1996-01-01
Provides a checklist of considerations for installing document image processing with an electronic document management system. Other topics include scanning; indexing; the image file life cycle; benefits of imaging; document-driven workflow; and planning for workplace changes like postsorting, creating a scanning room, redeveloping job tasks and…
Code of Federal Regulations, 2014 CFR
2014-01-01
... the timely, cost-effective management of document discovery (including, if applicable, electronically... discovery plan shall specify the form of electronic productions, if any. Documents are to be produced in... proceeding under this part may obtain document discovery by serving upon any other party in the proceeding a...
Code of Federal Regulations, 2012 CFR
2012-01-01
... the timely, cost-effective management of document discovery (including, if applicable, electronically... discovery plan shall specify the form of electronic productions, if any. Documents are to be produced in... proceeding under this part may obtain document discovery by serving upon any other party in the proceeding a...
Code of Federal Regulations, 2013 CFR
2013-01-01
... the timely, cost-effective management of document discovery (including, if applicable, electronically... discovery plan shall specify the form of electronic productions, if any. Documents are to be produced in... proceeding under this part may obtain document discovery by serving upon any other party in the proceeding a...
Continuous Risk Management Course. Revised
NASA Technical Reports Server (NTRS)
Hammer, Theodore F.
1999-01-01
This document includes a course plan for Continuous Risk Management taught by the Software Assurance Technology Center along with the Continuous Risk Management Guidebook of the Software Engineering Institute of Carnegie Mellon University and a description of Continuous Risk Management at NASA.
PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
Natural Resource Management Plan for Brookhaven National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
green, T.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).« less
Reducing environmental noise impacts: A USAREUR noise management program handbook
NASA Astrophysics Data System (ADS)
Feather, Timothy D.; Shekell, Ted K.
1991-06-01
Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.
222-S Laboratory Quality Assurance Plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meznarich, H.K.
1995-07-31
This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A qualitymore » assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.« less
7 CFR 3560.154 - Tenant selection.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., ethnicity, and sex of individual applicants on the basis of visual observation or surname,” and (10) Social... documented in the housing project's management plan and Affirmative Fair Housing Marketing Plan. (d...
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Reller, J. O., Jr.; Neel, C. B.; Haughney, L. C.
1973-01-01
The management concepts and operating procedures are documented as they apply to the planning of shuttle spacelab operations. Areas discussed include: airborne missions; formulation of missions; management procedures; experimenter involvement; experiment development and performance; data handling; safety procedures; and applications to shuttle spacelab planning. Characteristics of the airborne science experience are listed, and references and figures are included.
Study of airborne science experiment management concepts for application to space shuttle, volume 2
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Reller, J. O., Jr.; Neel, C. B.; Haughney, L. C.
1973-01-01
Airborne research management and shuttle sortie planning at the Ames Research Center are reported. Topics discussed include: basic criteria and procedures for the formulation and approval of airborne missions; ASO management structure and procedures; experiment design, development, and testing aircraft characteristics and experiment interfaces; information handling for airborne science missions; mission documentation requirements; and airborne science methods and shuttle sortie planning.
36 CFR 215.11 - Decisions subject to appeal.
Code of Federal Regulations, 2010 CFR
2010-07-01
... applicants for special use authorizations for use or occupancy of National Forest System lands (§ 251.86) and... for projects and activities implementing land and resource management plans (§ 215.2) documented in a... amendment to a land and resource management plan as a part of the decision; (b) A new DN after revision of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
... environmental impact statement (EIS) for the Mount Rushmore National Memorial General Management Plan (GMP) and will be preparing an Environmental Assessment (EA) instead. DATES: The draft GMP EA is expected to be... the appropriate level of environmental documentation for the GMP. Preliminary analysis of alternatives...
78 FR 48504 - Proposed Revisions to Maintenance Rule Standard Review Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-08
... Review Plan AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan-draft section revision... Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,'' Section 17... and Management System (ADAMS): You may access publicly available documents online in the NRC Library...
NASA Technical Reports Server (NTRS)
1981-01-01
The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.
30 CFR 250.109 - What documents must I prepare and maintain related to welding?
Code of Federal Regulations, 2010 CFR
2010-07-01
... related to welding? 250.109 Section 250.109 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF... Performance Standards § 250.109 What documents must I prepare and maintain related to welding? (a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Wichita Mountains Wildlife Refuge - Comprehensive Alternative Transportation Plan
DOT National Transportation Integrated Search
2014-05-01
The Comprehensive Alternative Transportation Plan for Wichita Mountains Wildlife Refuge in southwestern Oklahoma analyzes a range of transportation and resource management challenges and documents a holistic set of alternative transportation strategi...
78 FR 72903 - Collection of Information Under Review by Office of Management and Budget
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-04
... will address them accordingly. Viewing Comments and Documents To view comments, as well as documents.... This information is required to control vessel traffic, develop contingency plans and enforce...
Knowledge enabled plan of care and documentation prototype.
DaDamio, Rebecca; Gugerty, Brian; Kennedy, Rosemary
2006-01-01
There exist significant challenges in integrating the plan of care into documentation and point of care operational processes. A plan of care is often a static artifact that meets regulatory standards with limited influence on supporting goal-directed care delivery processes. Although this prototype is applicable to many clinical disciplines, we will highlight nursing processes in demonstrating a knowledge-driven computerized solution that fully integrates the plan of care within documentation. The knowledge-driven solution reflects evidenced-based practice; is an effective tool for managing problems, orders/interventions, and the patient's progress towards expected outcomes; meets regulatory standards; and drives quality and process improvement. The knowledge infrastructure consists of fully represented terminology, structured clinical expressions utilizing the controlled terminology and clinical knowledge representing evidence-based practice.
NASA Technical Reports Server (NTRS)
Hancock, David W., III
1999-01-01
This document provides the Software Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Terminal (IST) Software. For the I-SIPS Software, the SDS will produce Level 0, Level 1, and Level 2 data products as well as the associated product quality assessments and descriptive information. For the IST Software, the SDS will accommodate the GLAS instrument support areas of engineering status, command, performance assessment, and instrument health status.
36 CFR 218.8 - Filing an objection.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Forest Service directives and land management plans, (3) Documents referenced by the Forest Service in... objection process. (b) Incorporation of documents by reference is not allowed, except for the following list of items which may be provided by including date, page, and section of the cited document. All other...
36 CFR 218.8 - Filing an objection.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Forest Service directives and land management plans, (3) Documents referenced by the Forest Service in... objection process. (b) Incorporation of documents by reference is not allowed, except for the following list of items which may be provided by including date, page, and section of the cited document. All other...
36 CFR 218.8 - Filing an objection.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Forest Service directives and land management plans, (3) Documents referenced by the Forest Service in... objection process. (b) Incorporation of documents by reference is not allowed, except for the following list of items which may be provided by including date, page, and section of the cited document. All other...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
...This document contains a notice of pendency before the Department of Labor (the Department) of a proposed amendment to PTE 96- 23. The exemption permits various transactions involving employee benefit plans whose assets are managed by in-house asset managers (INHAMs), provided the conditions of the exemption are met. The proposed amendment would affect participants and beneficiaries of employee benefit plans, the sponsoring employers of such plans, INHAMs, and other persons engaging in the described transactions.
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
44 CFR 302.3 - Documentation of eligibility.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS CIVIL DEFENSE-STATE AND LOCAL EMERGENCY MANAGEMENT ASSISTANCE... administrative plan, an emergency operations plan for civil defense, and an annual submission (including a... national plan (i.e., program) for civil defense and as meeting the requirements of the regulations in this...
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
Code of Federal Regulations, 2012 CFR
2012-07-01
... OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information General Information § 550.200 Definitions... of Safety and Environmental Enforcement. CID means Conservation Information Document. CZMA means Coastal Zone Management Act. DOCD means Development Operations Coordination Document. DPP means...
System integration test plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.
75 FR 21221 - Plan Revision for Kaibab National Forest; Coconino, Yavapai, and Mojave Counties; AZ
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... available at: http://fs.usda.gov/goto/kaibab/plan_rev_docs . The Comprehensive Evaluation Report (CER) that... the existing Forest Plan and the proposed action for the plan revision. The CER supplementary document, which supplemented the CER with additional information to conform to the Analysis of Management...
Handbook to strategy 1 fungal taxa from the Northwest Forest Plan.
Michael A. Castellano; Jane E. Smith; Thom O' Dell; Efrén Cázares; Susan Nugent
1999-01-01
There are 234 fungal species listed in the record of decision (ROD) for amendments to Forest Service and Bureau of Land Management planning documents within the range of the northern spotted owl. There are four strategies to established guidelines for the survey and management of various organisms, including amphibians, mammals, bryophytes, mollusks, vascular plants,...
30 CFR 250.109 - What documents must I prepare and maintain related to welding?
Code of Federal Regulations, 2013 CFR
2013-07-01
... related to welding? 250.109 Section 250.109 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL... welding? (a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan...
30 CFR 250.109 - What documents must I prepare and maintain related to welding?
Code of Federal Regulations, 2014 CFR
2014-07-01
... related to welding? 250.109 Section 250.109 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL... welding? (a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan...
30 CFR 250.109 - What documents must I prepare and maintain related to welding?
Code of Federal Regulations, 2012 CFR
2012-07-01
... related to welding? 250.109 Section 250.109 Mineral Resources BUREAU OF SAFETY AND ENVIRONMENTAL... welding? (a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan...
VDOT manual of practice for stormwater management.
DOT National Transportation Integrated Search
2004-01-01
This document is a revision of the VDOT Manual of Practice for Planning Stormwater Management prepared in 1991. The objective of this revised manual is to provide updated information regarding the management of stormwater at VDOT projects and facilit...
High resolution microwave spectrometer sounder (HIMSS), volume 1, book 2
NASA Technical Reports Server (NTRS)
1990-01-01
The following topics are presented with respect to the high resolution microwave spectrometer sounder (HIMSS) that is to be used as an instrument for NASA's Earth Observing System (EOS): (1) preliminary program plans; (2) contract end item (CEI) specification; and (3) the instrument interface description document. Under the preliminary program plans section, plans dealing with the following subject areas are discussed: spares, performance assurance, configuration management, software implementation, contamination, calibration management, and verification.
Managemant of NASA's major projects
NASA Technical Reports Server (NTRS)
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
DOT National Transportation Integrated Search
2008-03-01
This document, the AMS Experimental Plan, lays out the scope of analysis that will be conducted through the application of the AMS methodology to the Test Corridor. The specific objectives of the Experimental Plan are: create an AMS framework that id...
Job Creation through Entrepreneurship. Instructional Package.
ERIC Educational Resources Information Center
Chippewa Valley Technical Coll., Eau Claire, WI.
This document contains materials for teachers and students for a 12-session workshop course on entrepreneurship and small business management. Lesson plans for the 12 sessions cover the following topics: business plan and goals; planning, goal setting, and identifying your business; financing; physically setting up business; advertising;…
Site scientific mission plan for the Southern Great Plains CART site, January-June 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.
1994-12-01
The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less
2008 U.S. Coast Guard Innovation Expo
2008-11-20
for Capability (CG-7) Public Release Authorized DCO Outcomes • Mission Performance Plans, policies, strategic analysis and planning, assessments and...Untitled Document 2008 U.S.htm[5/26/ 2016 2:24:38 PM] 2008 U.S. Coast Guard Innovation Expo “Collaboration Fuels Innovation” Virginia Beach, Virginia...Untitled Document 2008 U.S.htm[5/26/ 2016 2:24:38 PM] Panelists: Mr. Tom Tomaiko, Maritime Security Program Manager, Borders and Maritime Security
Support to LANL: Cost estimation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less
Los Alamos National Laboratory emergency management plan. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramsey, G.F.
1998-07-15
The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents,more » transportation accidents, electrical accidents, and natural disasters.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... Management Regulations concerning Open Burning, Permits and Regulation of Volatile Organic Compounds. TDEC... interested in commenting on this document should do so at this time. DATES: Written comments must be received... document. Any parties interested in commenting on this document should do so at this time. Dated: February...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less
RISK MANAGEMENT RESEARCH PLAN FOR ECOSYSTEM RESTORATION IN WATERSHEDS
This document outlines the scope of National Risk Management Laboratory (NRMRL) risk management research in the area of ecosystem restoration. NRMRL is uniquely positioned to make substantial contributions to ecosystem science because of its in-house expertise relative to surfac...
Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dickerson, L.S.
1988-05-01
The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less
Recommendations for a Chicago River traffic plan
DOT National Transportation Integrated Search
2004-01-01
This report documents recent efforts to examine the vessel traffic conditions on the Chicago River and to develop recommendations to the City of Chicago, Department of Transportation for establishing a River Management Plan. Interviews were held with...
NASA Technical Reports Server (NTRS)
Olsen, C. D.
1972-01-01
Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.
Business planning: can the health service move from strategy into action?
Bennett, A R
1994-01-01
Advances the case for the use of one particular business planning technique within a National Health Service Trust. At the present time, NHS trusts are required to write strategic direction statements. Evidence suggests that these documents provide an accurate account of past performance and present position of the trust, but do not express the future position intended to be achieved. These documents also tend to be lengthy and lack strategic focus, which means that they are not helpful to managers who want clear organizational goals and objectives to which to work. Attempts to address the difficulties associated with determining how existing skills and resources can be used as the platform for future growth strategies by using the Ansoff Matrix and SWOT Analysis planning tools, given the external changes in the marketplace. Also attempts to shed light on some of the important links between busines strategy and management development by extending planning theory into practice.
ERIC Educational Resources Information Center
Spencer, Richard L.; And Others
Within this document, and presented in their entirety, are five reports which depict differing views of Delaware County Community College (DCCC) from 1974 through 1980. The reports consist of both historical and predictive data, evolved from staff work related to long and short range planning. The general framework for this activity revolved about…
Analytical Approaches to Guide SLS Fault Management (FM) Development
NASA Technical Reports Server (NTRS)
Patterson, Jonathan D.
2012-01-01
Extensive analysis is needed to determine the right set of FM capabilities to provide the most coverage without significantly increasing the cost, reliability (FP/FN), and complexity of the overall vehicle systems. Strong collaboration with the stakeholders is required to support the determination of the best triggers and response options. The SLS Fault Management process has been documented in the Space Launch System Program (SLSP) Fault Management Plan (SLS-PLAN-085).
Planning for Change in Higher Education.
ERIC Educational Resources Information Center
Ostergren, Bertil
This document, adapted to readers who are not familiar with institutional details in Swedish higher education, outlines planning and management at regional and central levels. Emphasis is placed on qualitative aspects of planning and on identification of obstacles and possibilities of change and innovation. A central problem for the study is to…
National Weather- RFC Development Management
Map News Organization Search NWS ALL NOAA Go RFC Development Management Presentations Projects & ; Plans RFC Development Program RFC Archive Database Documentation Outline Workshops Contact Us resources and services. Description Graphic The RFC Development Management component of the Office of
17 CFR 75.3 - Prohibition on proprietary trading.
Code of Federal Regulations, 2014 CFR
2014-04-01
... (CONTINUED) PROPRIETARY TRADING AND CERTAIN INTERESTS IN AND RELATIONSHIPS WITH COVERED FUNDS Proprietary... of liquidity management in accordance with a documented liquidity management plan of the banking... liquidity management purposes, the amount, types, and risks of these securities that are consistent with...
17 CFR 255.3 - Prohibition on proprietary trading.
Code of Federal Regulations, 2014 CFR
2014-04-01
... (CONTINUED) PROPRIETARY TRADING AND CERTAIN INTERESTS IN AND RELATIONSHIPS WITH COVERED FUNDS Proprietary... purpose of liquidity management in accordance with a documented liquidity management plan of the banking... liquidity management purposes, the amount, types, and risks of these securities that are consistent with...
Natural Resource Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green, T.; Schwager, K.
This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less
Orr, Richard H.; Pings, Vern M.; Pizer, Irwin H.; Olson, Edwin E.; Spencer, Carol C.
1968-01-01
A method of measuring a library's capability for providing the documents its users need has been developed. The library is tested with a representative sample of such documents to determine how long would be required for users to obtain these documents. Test results are expressed in terms of a Capability Index, which has a maximal value of 100 only if all the sample documents are found “on shelf.” Specific tests employing samples of 300 documents have been developed that are appropriate for academic and for “reservoir” biomedical libraries. Realistic field trials have demonstrated that these two tests are practical to administer and that test results are adequately reproducible. When strict comparability is not important, a library can test itself. In assessing a reservoir library, test results are supplemented by data on its typical processing time for interlibrary loan requests. Currently these tests are being used in a national survey. The general method is applicable to other types of libraries, provided appropriate test samples are established. If their limitations are clearly understood, these “Document Delivery Tests” can be valuable tools for planning and managing library services. PMID:5665969
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less
The Interior Columbia Basin Ecosystem Management Project: scientific assessment.
1999-01-01
This CD-ROM contains digital versions (PDF) of the major scientific documents prepared for the Interior Columbia Basin Ecosystem Management Project (ICBEMP). "A Framework for Ecosystem Management in the Interior Columbia Basin and Portions of the Klamath and Great Basins" describes a general planning model for ecosystem management. The "Highlighted...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Comptroller imposes a quantitative limitation on the conduct of such activity by the federal branch; (3) Is... study, management plan, financial projections, business plan, or similar document concerning the conduct...
Appendix to project memorandum : metropolitan planning reviews : examples of MPO documentation
DOT National Transportation Integrated Search
1995-05-16
On November 26, 1991 Congress enacted the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). This legislation mandates that Transportation Management Areas (urbanized areas with populations over 200,000) include as part of the planning...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 246.401 General. The requirement for a quality assurance surveillance plan shall be addressed and documented in the contract file... services, the contracting officer should prepare a quality assurance surveillance plan to facilitate...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-10
... site. This document contains pertinent and descriptive information regarding planning issues... any participant who wishes to clarify the views he or she expressed. The BLM will evaluate identified...
Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2014-01-01
North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-04
... document is available on the internet at the NPS Planning, Environment, and Public Comment Web site at http.../EIS assesses impacts to soil resources, water quality, soundscapes, vegetation and wildlife...
AQUATIC STRESSORS: FRAMEWORK AND IMPLEMENTATION PLAN FOR EFFECTS RESEARCH
This document describes the framework and research implementation plans for ecological effects research on aquatic stressors within the National Health and Environmental Effects Laboratory. The context for the research identified within the framework is the common management goal...
NOSC Program Managers Handbook. Revision 1
1988-02-01
cost. The effects of application of life-cycle cost analysis through the planning and RIDT&E phases of a program, and the " design to cost" concept on...is the plan for assuring the quality of the design , design documentation, and fabricated/assembled hardware and associated computer software. 13.5.3.2...listings and printouts, which document the n. requirements, design , or details of compute : software; explain the capabilities and limitations of the
Data categories for marine planning
Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.
2015-01-01
The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.
National Airspace System interface management plan
DOT National Transportation Integrated Search
1986-01-01
This document is intended to implement Interface Management for interfacing subsystems of the National Airspace System (NAS) and for external NAS interfaces by establishing a process which assures that: Interface requirements are agreed to by interfa...
Language Universalization for Improved Information Management: The Necessity for Esperanto.
ERIC Educational Resources Information Center
Jones, R. Kent
1978-01-01
Discusses problems for information management in dealing with multilingual documentation. The planned language, Esperanto, is suggested as a universal working language because of its neutrality, rational structure, clarity, and expressive power. (Author/CWM)
TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BURBANK, D.A.
This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less
Development and evaluation of an aged care specific Advance Care Plan.
Silvester, William; Parslow, Ruth A; Lewis, Virginia J; Fullam, Rachael S; Sjanta, Rebekah; Jackson, Lynne; White, Vanessa; Hudson, Rosalie
2013-06-01
To report on the quality of advance care planning (ACP) documents in use in residential aged care facilities (RACF) in areas of Victoria Australia prior to a systematic intervention; to report on the development and performance of an aged care specific Advance Care Plan template used during the intervention. An audit of the quality of pre-existing documentation used to record resident treatment preferences and end-of-life wishes at participating RACFs; development and pilot of an aged care specific Advance Care Plan template; an audit of the completeness and quality of Advance Care Plans completed on the new template during a systematic ACP intervention. 19 selected RACFs (managed by 12 aged care organisations) in metropolitan and regional areas of Victoria. Documentation in use at facilities prior to the ACP intervention most commonly recorded preferences regarding hospital transfer, life prolonging treatment and personal/cultural/religious wishes. However, 7 of 12 document sets failed to adequately and clearly specify the resident's preferences as regards life prolonging medical treatment. The newly developed aged care specific Advance Care Plan template was met with approval by participating RACFs. Of 203 Advance Care Plans completed on the template throughout the project period, 49% included the appointment of a Medical Enduring Power of Attorney. Requests concerning medical treatment were specified in almost all completed documents (97%), with 73% nominating the option of refusal of life-prolonging treatment. Over 90% of plans included information concerning residents' values and beliefs, and future health situations that the resident would find to be unacceptable were specified in 78% of completed plans. Standardised procedures and documentation are needed to improve the quality of processes, documents and outcomes of ACP in the residential aged care sector.
ERIC Educational Resources Information Center
Department of Commerce, Washington, DC.
The first of two volumes, this document describes the planning process of a 5-year plan for meeting the telecommunications and automatic data processing (ADP) needs of the federal government, examines the planning efforts of several typical agencies, and explores issues involved in managing new technology as it evolves. For each agency,…
NASA Technical Reports Server (NTRS)
Laudeman, Irene V.; Brasil, Connie L.; Stassart, Philippe
1998-01-01
The Planview Graphical User Interface (PGUI) is the primary display of air traffic for the Conflict Prediction and Trial Planning, function of the Center TRACON Automation System. The PGUI displays air traffic information that assists the user in making decisions related to conflict detection, conflict resolution, and traffic flow management. The intent of this document is to outline the human factors issues related to the design of the conflict prediction and trial planning portions of the PGUI, document all human factors related design changes made to the PGUI from December 1996 to September 1997, and outline future plans for the ongoing PGUI design.
NSF-Sponsored Biological and Chemical Oceanography Data Management Office
NASA Astrophysics Data System (ADS)
Allison, M. D.; Chandler, C. L.; Copley, N.; Galvarino, C.; Gegg, S. R.; Glover, D. M.; Groman, R. C.; Wiebe, P. H.; Work, T. T.; Biological; Chemical Oceanography Data Management Office
2010-12-01
Ocean biogeochemistry and marine ecosystem research projects are inherently interdisciplinary and benefit from improved access to well-documented data. Improved data sharing practices are important to the continued exploration of research themes that are a central focus of the ocean science community and are essential to interdisciplinary and international collaborations that address complex, global research themes. In 2006, the National Science Foundation Division of Ocean Sciences (NSF OCE) funded the Biological and Chemical Oceanography Data Management Office (BCO-DMO) to serve the data management requirements of scientific investigators funded by the National Science Foundation’s Biological and Chemical Oceanography Sections. BCO-DMO staff members work with investigators to manage marine biogeochemical, ecological, and oceanographic data and information developed in the course of scientific research. These valuable data sets are documented, stored, disseminated, and protected over short and intermediate time frames. One of the goals of the BCO-DMO is to facilitate regional, national, and international data and information exchange through improved data discovery, access, display, downloading, and interoperability. In May 2010, NSF released a statement to the effect that in October 2010, it is planning to require that all proposals include a data management plan in the form of a two-page supplementary document. The data management plan would be an element of the merit review process. NSF has long been committed to making data from NSF-funded research publicly available and the new policy will strengthen this commitment. BCO-DMO is poised to assist in creating the data management plans and in ultimately serving the data and information resulting from NSF OCE funded research. We will present an overview of the data management system capabilities including: geospatial and text-based data discovery and access systems; recent enhancements to data search tools; data export and download utilities; and strategic use of controlled vocabularies to facilitate data integration and improve interoperability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
NASA Technical Reports Server (NTRS)
Idris, Husni; Vivona, Robert A.; Al-Wakil, Tarek
2009-01-01
This document describes exploratory research on a distributed, trajectory oriented approach for traffic complexity management. The approach is to manage traffic complexity based on preserving trajectory flexibility and minimizing constraints. In particular, the document presents metrics for trajectory flexibility; a method for estimating these metrics based on discrete time and degree of freedom assumptions; a planning algorithm using these metrics to preserve flexibility; and preliminary experiments testing the impact of preserving trajectory flexibility on traffic complexity. The document also describes an early demonstration capability of the trajectory flexibility preservation function in the NASA Autonomous Operations Planner (AOP) platform.
DISC (Defense Industrial Supply Center) TQM (Total Quality Management) Operations Plan
1989-07-01
This document represents the continuance of the Defense Industrial Supply Center implementation of Total Quality Management which began in 1986. It...outlines how DISC intends to emphasize process improvement through the integration of all TQM initiates. Quality management at DISC prescribes defining
Maintaining Research Documents with Database Management Software.
ERIC Educational Resources Information Center
Harrington, Stuart A.
1999-01-01
Discusses taking notes for research projects and organizing them into card files; reviews the literature on personal filing systems; introduces the basic process of database management; and offers a plan for managing research notes. Describes field groups and field definitions, data entry, and creating reports. (LRW)
Hazards Associated with Legacy Nitrate Salt Waste Drums Managed under the Container Isolation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Funk, David John; Clark, David Lewis
At present, there are 29 drums of nitrate waste salts (oxidizers with potentially acidic liquid bearing RCRA characteristics D001 and D002) that are awaiting processing, specifically to eliminate these characteristics and to allow for ultimate disposition at WIPP. As a result of the Feb. 14th, 2014 drum breach at WIPP, and the subsequent identification of the breached drum as a product ofLANL TRU waste disposition on May 15th, 2014, these 29 containers were moved into the Perrnacon in Dome 231 at TA-54 Area G, as part of the New Mexico Environment Department (NMED) approved container isolation plan. The plan ismore » designed to mitigate hazards associated with the nitrate salt bearing waste stream. The purpose of this document is to articulate the hazards associated with un-remediated nitrate salts while in storage at LANL. These hazards are distinctly different from the Swheat-remediated nitrate salt bearing drums, and this document is intended to support the request to remove the un-remediated drums from management under the container isolation plan. Plans to remediate and/or treat both of these waste types are being developed separately, and are beyond the scope of this document.« less
Basic Training Course/Emergency Medical Technician (Second Edition). Instructor's Lesson Plan.
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
This document containing instructor lesson plans is one of three prepared to update a basic training program for emergency medical technicians (EMTs). (A course guide containing planning and management information and a study guide are available separately.) Material covers all emergency medical techniques currently considered to be within the…
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
Guideline for the Comprehensive Campus Master Plan System.
ERIC Educational Resources Information Center
State Univ. System of Florida, Tallahassee.
This document is a guideline for institutions in the Florida State University System to use as they comply with state mandates requiring them to develop campus master plans and land management plans. It supplements the minimum criteria in the state's Administrative Code. For each element the guide offers description of its purpose, data…
Evolution & Status of Approval Plans. SPEC Kit 221.
ERIC Educational Resources Information Center
Flood, Susan, Comp.
This report documents the results of a survey on the current use and management of approval plans, and compares them with similar studies published in SPEC kits in 1982 and 1988. Overall, Association of Research Libraries (ARL) institutions still consider approval plans to be efficient and cost effective. Survey results include: (1) the percentage…
Development and Reliability of the Comprehensive Crisis Plan Checklist
ERIC Educational Resources Information Center
Aspiranti, Kathleen B.; Pelchar, Taylor K.; McCLeary, Daniel F.; Bain, Sherry K.; Foster, Lisa N.
2011-01-01
It is of vital importance that children are educated in a safe environment. Every school needs to have a well-developed crisis management document containing plans for prevention, intervention, and postvention. We developed the Comprehensive Crisis Plan Checklist (CCPC) to serve as a valuable tool that can be used to assist practitioners with…
Evaluation and Follow-Up of Policies, Plans and Reforms of Education: Round Table V.
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Paris (France). Div. of Educational Policy and Planning.
The proceedings from a round table held at an international symposium focuses on the planning and management of educational development. The following papers are included in this document: "Overall View on the Evaluation of Educational Plans and Reforms (Ingemar Fagerlind); "Evaluation and Research Capacity-Building in Education Meeting…
An aquatic multiscale assessment and planning framework approach—forest plan revision case study
Kerry Overton; Ann D. Carlson; Cynthia Tait
2010-01-01
The Aquatic Multiscale Assessment and Planning Framework is a Web-based decision-support tool developed to assist aquatic practitioners in managing fisheries and watershed information. This tool, or framework, was designed to assist resource assessments and planning efforts from the broad scale to the fine scale, to document procedures, and to link directly to relevant...
Kennedy Space Center Florida Scrub-Jay Compensation Plan
NASA Technical Reports Server (NTRS)
Pitcock, Taylor Morgan (Compiler)
2014-01-01
Many organizations have interest in using NASA property on KSC. The purpose of this document is to consolidate the goals of ecosystem management associated with Florida Scrub-Jays and compliance with the Endangered Species Act (ESA) in order to streamline and reduce the costs of facility planning, impact assessment, and impact minimization. This will simplify the process and reduce regulatory uncertainty.However, the resulting process must be consistent with the Merritt Island National Wildlife Refuge (MINWR) Comprehensive Conservation Plan (CCP). In addition, this document considers anticipated construction impacts on KSC during the next 10 years and summarizes priorities in a spatially explicit manner. The document describes anticipated compensation requirements to facilitate restoration of degraded habitat in areas most important to the KSC Scrub-Jay population through resources provided to MINWR. The plan assumes that all construction on KSC is compensated on KSC.
Long Island Transportation Plan to Manage Congestion: Study Goals and Objectives
DOT National Transportation Integrated Search
2002-04-20
This three page document sets out five goals for the Long Island Transportation Plan Study and corresponding objectives. Those goals are (1) Create a framework to develop an integrated multi-modal transportation program for Long Island which coordina...
Théroux, Jean; Le May, Sylvie; Fortin, Carole; Labelle, Hubert
2015-01-01
BACKGROUND: Back pain (BP) has often been associated with adolescent idiopathic scoliosis (AIS), which is a three-dimensional deviation of the vertebral column. In adolescents, chronic pain appears to be a predictor of health care utilization and has a negative impact on physical, psychological and family well-being. In this population, BP tends to be persistent and may be a predictor of BP in adulthood. OBJECTIVE: To document the prevalence and management of BP in AIS patients. METHODS: A retrospective chart review of AIS patients who were referred to Sainte-Justine University Teaching Hospital (Montreal, Quebec) from 2006 to 2011 was conducted. RESULTS: A total of 310 randomly selected charts were reviewed. Nearly one-half of the patients (47.3%) mentioned that they experienced BP, most commonly in the lumbar (19.7%) and thoracic regions (7.7%). The type of BP was documented in only 36% (n=112) of the charts. Pain intensity was specified in only 21% (n=65) of the charts. In approximately 80% (n=248) of the charts, no pain management treatment plan was documented. CONCLUSIONS: The prevalence of BP was moderately high among the present sample of adolescents with AIS. An improved system for documenting BP assessment, type, treatment plan and treatment effectiveness would improve pain management for these patients. PMID:25831076
Douglas N. Swanston; Charles G. Shaw; Winston P. Smith; Kent R. Julin; Guy A. Cellier; Fred H. Everest
1996-01-01
This document highlights key items of information obtained from the published literature and from specific assessments, workshops, resource analyses, and various risk assessment panels conducted as part of the Tongass land management planning process. None of this information dictates any particular decision; however, it is important to consider during decisionmaking...
ERIC Educational Resources Information Center
Peters, Howard
This document presents the data gathered by the author when he made an international study tour in 1970. The purpose of the tour was the investigation of planning and management in tertiary education, with particular reference to the cost effectiveness of colleges of higher education in Australia. The tour began with visits to the cities of…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matuszak, M; Anderson, C; Lee, C
Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less
Assessing hospital emergency management plans: a guide for infection preventionists.
Rebmann, Terri
2009-11-01
Hospital emergency management plans are essential and must include input from an infection preventionist (IP). Multiple hospital planning documents exist, but many do not address infection prevention issues, combine them with noninfection prevention issues, or are disease/event specific. An all-encompassing emergency management planning guide for IPs is needed. A literature review and Internet search were conducted in December 2008. Data from relevant sources were extracted. A spreadsheet was created that delineated hospital emergency management plan components of interest to IPs. Of the sources screened, 49 were deemed relevant. Eleven domains were identified: (1) having a plan; (2) assessing hospital readiness; (3) having infection prevention policies and procedures; (4) having occupational health policies and procedures; (5) conducting surveillance and triage; (6) reporting incidents, having a communication plan, and managing information; (7) having laboratory support; (8) addressing surge capacity issues; (9) having anti-infective therapy and/or vaccines; (10) providing infection prevention education; and (11) managing physical plant issues. Infection preventionists should use this article as an assessment tool for evaluating their hospital emergency management plan and for developing policies and procedures that will decrease the risk of infection transmission during a mass casualty event.
NASA Technical Reports Server (NTRS)
Callender, E. David; Steinbacher, Jody
1989-01-01
This is the fourth of five volumes on Information System Life-Cycle and Documentation Standards. This volume provides a well organized, easily used standard for assurance documentation for information systems and software, hardware, and operational procedures components, and related processes. The specifications are developed in conjunction with the corresponding management plans specifying the assurance activities to be performed.
40 CFR Appendix V to Part 51 - Criteria for Determining the Completeness of Plan Submissions
Code of Federal Regulations, 2010 CFR
2010-07-01
... an exact duplicate of the hard copy with changes indicated, signed documents need to be in portable document format, rules need to be in text format and files need to be submitted in manageable amounts (e.g...
Personnel Management: Two Year Colleges.
ERIC Educational Resources Information Center
Ohio Board of Regents, Columbus. Management Improvement Program.
This document is one of five manuals designed to improve management practices in Ohio two-year colleges. A chapter on organizing for personnel management discusses basic personnel functions, roles and responsibilities of administrators, and the need for a central statewide office of personnel affairs. A chapter on planning, policies, and…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2008-0022... Preparedness Program Manual AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice of availability. SUMMARY: The Federal Emergency Management Agency (FEMA) is issuing two final guidance documents...
Report on a Knowledge-Based Software Assistant.
1983-08-01
maintainers, project managers , and end-users). In this paradigm, software activities, including definition, management , and validation will be...project management . This report also presents a plan for the development of the KBSA, along with a description of the necessary supporting technology...Activity Coordination .. .. .. ..... ...... ..... .... 19 3.2 Project Management and Documentation. .. ... ........ 20 3.2.1 Project Management Facet
Managers Handbook for Software Development
NASA Technical Reports Server (NTRS)
Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.
1984-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.
Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleman, L.I.
1990-06-01
This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
Aligning Strategic and Information Systems Planning: A Review of Navy Efforts
1990-03-01
plans." [Ref. 11:p. 6] The results of the component level IR planning process are documented in Component Information Management Plans ( CIMP ). In mid...August, the CIMP’s are presented to the IR Planning Committee at the annual IR Planning Conference. Each CIMP is then distributed to all organizations...objectives promulgated in the CIMP or FASP will, if approved for development or acquisition, be further refined in project plans, which in turn, form the
Cline, Robert; Sexton, Natalie; Stewart, Susan C.
2007-01-01
The following report was prepared for the U.S. Fish and Wildlife Service National Refuge System in support of their Comprehensive Conservation Planning (CCP) efforts by the Policy Analysis and Science Assistance Branch (PASA), Fort Collins Science Center, U.S. Geological Survey. While this document provides a summary of contemporary recreation management literature and methodologies, relevant to the subject of managing wildlife disturbances on national wildlife refuges, this document should be viewed as a starting point for management administrators. This document identifies general issues relating to wildlife disturbance and visitor impacts including a description of disturbance, recreational impacts, related human dimensions applications, management frameworks, and a general summary of management solutions. The section on descriptions of wildlife disturbance and impacts draws heavily from the report entitled 'Managing the Impacts of Visitor Use on Waterbirds -- A Literature Review of Impacts and Mitigation' (DeLong, 2002; Delong and Adamcik, in press) and is referenced in the text. This document is more comprehensive in its review of wildlife response to disturbance. This document is intended to discuss the human-dimensions aspect of wildlife disturbance, summarizing human dimensions and recreation management literature as it applies to this topic.
NASA Technical Reports Server (NTRS)
1971-01-01
A description is given of the proposed project organization, documentation and reports, project planning, direction and control, related experience and facilities, and cost estimate data and options for the implementation of the bioresearch module development program.
ANALYTICAL METHOD CHECKLIST FOR VOLATILE ORGANIC COMPOUNDS BY GC/MS (HANDOUT)
The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...
SDC DOCUMENTS APPLICABLE TO STATE AND LOCAL GOVERNMENT PROBLEMS.
Public administration , Urban and regional planning, The administration of justice, Bio-medical systems, Educational systems, Computer program systems, The development and management of computer-based systems, Information retrieval, Simulation. AD numbers are provided for those documents which can be obtained from the Defense Documentation Center or the Department of Commerce’s Clearinghouse for Federal Scientific and Technical Information.
Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carr, Adrianne E.; Wuthrich, Kelsey K.; Ziech, Angela M.
2013-03-01
This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use ormore » with monitoring data.« less
Infrastructure Task Force Tribal Solid Waste Management
These documents describe 1) issues to consider when planning and designing community engagement approaches for tribal integrated waste management programs and 2) a proposed approach to improve tribal open dumps data and solid waste projects, and 3) an MOU.
Analysis and preliminary design of Kunming land use and planning management information system
NASA Astrophysics Data System (ADS)
Li, Li; Chen, Zhenjie
2007-06-01
This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.
Berkeley Lab - Materials Sciences Division
? Click Here! Resources for MSD Safety MSD Safety MSD's Integrated Safety Management Plan [PDF] Safety culture and policies at MSD MSD0010: Integrated Safety Management: Principles and Case Studies Calendar for MSD classes on Integrated Safety Management MSD0015 Handout - Waste Briefing Document [PDF] Waste
Vision and Strategic Planning.
ERIC Educational Resources Information Center
Lumby, Jacky
This document is a chapter in "The Principles and Practice of Educational Management," which aims to provide a systematic and analytical introduction to the study of educational management. The structure of the book reflects the main substantive areas of educational leadership and management, and most of the major themes are covered in the…
ERIC Educational Resources Information Center
Department for Education and Employment, London (England).
The aim of these documents is to assist Local Authorities in Britain with asset management planning (AMPs) for schools. AMPs set out the information needed, and the criteria used, to make decisions about spending on school premises which will: raise standards of educational attainment; provide sustainable and energy-efficient buildings that are…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-27
... Standard Review Plan, Section 1.0 on Introduction and Interfaces AGENCY: Nuclear Regulatory Commission (NRC... Revision 2 to Standard Review Plan (SRP), Section 1.0, ``Introduction and Interfaces'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110110573). The Office of New Reactors (NRO...
Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.
ERIC Educational Resources Information Center
Jacobs, Linda
This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…
Beall, Robert M.
1974-01-01
Urban water planning, development, and management are many sectored, costly efforts, subject to a multitude of controls and demands including those imposed by nature. One primary concern in development is for providing a dependable and safe water supply. In spite of a bountiful natural availability, the process of satisfying consumer needs involves the resolution of a variety of problems, not the least of which are cooperation and coordination among suppliers. One of the fundamental requisites in seeking sound solutions to developmental and environmental problems is inventory documentation. This map is one facet of documentation; the data listing, given on sheet 2, is the companion inventory. These supplement State, regional, and local efforts directed toward both long-range planning and current evaluation programs. Such documentation also assists the assessment of the effect of one water-management subsystem on hydrologic characteristics.
Chemotherapy extravasations: prevention, identification, management, and documentation.
Gonzalez, Tulia
2013-02-01
The nurses' role in safe and effective practice of chemotherapy administration is paramount. The purpose of this article is to present nurses administering chemotherapy with evidence-based information useful in eliminating or reducing the severity of an injury from a chemotherapy extravasation. Nurse education is essential to prevent, recognize, manage, and document chemotherapy extravasations. The classification of the cytotoxic drug and its mechanism of action is useful when selecting the IV access device and also will direct the nurse's intervention to manage the injury. The Oncology Nursing Society's Chemotherapy and Biotherapy Guidelines and Recommendations for Practice and the drug manufacturer are the best sources offering pharmacologic and nonpharmacologic recommendations. The nurse's best ally in the prevention, prompt recognition, and management of an extravasation is the educated patient. Documenting chemotherapy extravasation is another important step to guide the treatment plan; therefore, the document must provide complete details and the extent of the event.
Horne, Avril C; Szemis, Joanna M; Webb, J Angus; Kaur, Simranjit; Stewardson, Michael J; Bond, Nick; Nathan, Rory
2018-03-01
One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.
NASA Astrophysics Data System (ADS)
Horne, Avril C.; Szemis, Joanna M.; Webb, J. Angus; Kaur, Simranjit; Stewardson, Michael J.; Bond, Nick; Nathan, Rory
2018-03-01
One important aspect of adaptive management is the clear and transparent documentation of hypotheses, together with the use of predictive models (complete with any assumptions) to test those hypotheses. Documentation of such models can improve the ability to learn from management decisions and supports dialog between stakeholders. A key challenge is how best to represent the existing scientific knowledge to support decision-making. Such challenges are currently emerging in the field of environmental water management in Australia, where managers are required to prioritize the delivery of environmental water on an annual basis, using a transparent and evidence-based decision framework. We argue that the development of models of ecological responses to environmental water use needs to support both the planning and implementation cycles of adaptive management. Here we demonstrate an approach based on the use of Conditional Probability Networks to translate existing ecological knowledge into quantitative models that include temporal dynamics to support adaptive environmental flow management. It equally extends to other applications where knowledge is incomplete, but decisions must still be made.
Quality assurance planning for lunar Mars exploration
NASA Technical Reports Server (NTRS)
Myers, Kay
1991-01-01
A review is presented of the tools and techniques required to meet the challenge of total quality in the goal of traveling to Mars and returning to the moon. One program used by NASA to ensure the integrity of baselined requirements documents is configuration management (CM). CM is defined as an integrated management process that documents and identifies the functional and physical characteristics of a facility's systems, structures, computer software, and components. It also ensures that changes to these characteristics are properly assessed, developed, approved, implemented, verified, recorded, and incorporated into the facility's documentation. Three principal areas are discussed that will realize significant efficiencies and enhanced effectiveness, change assessment, change avoidance, and requirements management.
40 CFR 62.14620 - What site-specific documentation is required?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) Procedures for receiving, handling, and charging waste. (3) Incinerator startup, shutdown, and malfunction... limits. (7) Reporting and recordkeeping procedures. (8) The waste management plan required under §§ 62...
NASA Technical Reports Server (NTRS)
1994-01-01
The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.
GSC configuration management plan
NASA Technical Reports Server (NTRS)
Withers, B. Edward
1990-01-01
The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.
NASCOM system development plan: System description, capabilities, and plans, FY 94-2
NASA Technical Reports Server (NTRS)
1994-01-01
The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.
NASA Technical Reports Server (NTRS)
Connelly, L. C.
1977-01-01
The mission planning processor is a user oriented tool for consumables management and is part of the total consumables subsystem management concept. The approach to be used in developing a working model of the mission planning processor is documented. The approach includes top-down design, structured programming techniques, and application of NASA approved software development standards. This development approach: (1) promotes cost effective software development, (2) enhances the quality and reliability of the working model, (3) encourages the sharing of the working model through a standard approach, and (4) promotes portability of the working model to other computer systems.
DOT National Transportation Integrated Search
1994-01-01
The Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991 required that states develop systems for managing highway pavement, bridges, safety, congestion, public transportation, and intermodal transportation. This document is Virginia's wo...
Capacity Assurance - A Twenty Year Planning Tool for the Future Management of Hazardous Waste
This page contains information about the assessment of national capacity is intended to reflect the reality of waste flows and needs for future management capacity along with the 2015 report, previous reports, and supporting documents
ERIC Educational Resources Information Center
Bishoff, Liz; Allen, Nancy
2004-01-01
The purpose of this document is to present a framework and resource guide to help cultural heritage institutions plan sustainable access to their digital cultural assets and to do so by means that link their missions to planning modes and models. To aid cultural heritage organizations in the business-planning process, this resource will do the…
36 CFR 9.17 - Public inspection of documents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.17 Public inspection of documents. (a) Upon receipt of the plan of operations the Superintendent shall publish a notice in the Federal Register... Superintendent during normal business hours. The availability of such records for inspection shall be governed by...
NASA Astrophysics Data System (ADS)
Hindrayani, Aniek; Purwanto
2018-02-01
The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.
TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook
1989-08-01
This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.
Program and Project Management Framework
NASA Technical Reports Server (NTRS)
Butler, Cassandra D.
2002-01-01
The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.
NASA Technical Reports Server (NTRS)
Vairo, Daniel M.
1998-01-01
The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.
This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collectedmore » from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).« less
Dolan, R; Broadbent, P
2016-02-01
Ward round documentation provides one of the most important means of communication between healthcare professionals. We aimed to establish if the use of a problem based standardised proforma can improve documentation in acute surgical receiving. Gold standards were established using the RCSE record keeping guidelines. We audited documentation for seven days using the following headings: patient name/identification number, subjective findings, objective findings, clinical impression/diagnosis, plan, diet status, discharge decision, discharge planning, signature, and grade. After the initial audit cycle, a ward round proforma was introduced using the above headings and re-audited over a seven day period. The pre-intervention arm contained 50 patients and the post intervention arm contained 47. The following headings showed an improvement in documentation compliance to 100%: patient name/identification number vs 96%, subjective findings vs 84%, objective findings vs 48%, plan vs 98%, signature vs 96%, and grade vs 62%. Documentation of the clinical impression/diagnosis improved to 98% vs 30%, diet status rose to 83% vs 16%, discharge decision to 66% vs 16%, and discharge planning to 40% vs 20%. Standardised proformas improve the documentation of post-take ward round notes. This helps to clarify the onward management plan for all aspects of a patient's care and will help avoid adverse events and litigation. This should improve the quality and safety of Patient Care.
Mississippi Curriculum Framework for Family Dynamics. Secondary Programs.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family dynamics. The course uses skills in critical thinking, decision…
78 FR 49359 - Pay Under the General Schedule and Recruitment, Relocation, and Retention Incentives
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-14
.... Agencies may, in their agency retention incentive plans, require documentation of private-sector job offers... Schedule and Recruitment, Relocation, and Retention Incentives AGENCY: U.S. Office of Personnel Management... to improve oversight of recruitment and retention incentive determinations; add succession planning...
DOT National Transportation Integrated Search
2001-04-01
This document affirms the U.S. Department of Transportation's (DOT) commitment to managing for results. It is DOT's second annual performance report and fourth annual performance plan. By combining the DOT performance report on 2000 results with the ...
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
ERIC Educational Resources Information Center
Strong, Gary E.
1987-01-01
Examples of problems encountered in a new library building--including rats and humidity--and a description of the library's collections provide a framework for this presentation of the California State Library's emergency management planning. Current preservation efforts are documented and the library's disaster and security plans are described.…
Underwood, Steven G.; Khalil, Syed M.; Byrnes, Mark R.; Steyer, Gregory D.; Raynie, Richard C
2015-01-01
Development of a comprehensive and stakeholder-driven Regional Sediment Management plan can provide the basis for long-term sustainable resource use and protection. This paper highlights three operational components that can positively influence sediment management at a regional scale, including (1) integration of an operational sediment budget, (2) development of a monitoring and adaptive management plan, and (3) development of a regional sediment availability and allocation program. These components seek to incorporate science and adaptive management through implementation of an organized and well-documented decision making process. They represent a coordinated framework that could serve as a guide for unifying financial investments in regional sediment management plans. Collectively, they establish an integrated process for addressing uncertainties about future system change in light of shrinking federal and state budgets, competing demands for sediment resources within riverine and marine waters, and policy considerations related to sediment/water use (e.g., navigation and commerce versus environmental management).
Kuwata, Shigeki; Yamada, Hitomi; Park, Keunsik
2011-01-01
Document management systems (DMS) have widespread in major hospitals in Japan as a platform to digitize the paper-based records being out of coverage by EPR. This study aimed to examine longitudinal trends of actual use of DMS in a hospital in which EPR had been in operation, which would be conducive to planning the further information management system in the hospital. Degrees of utilization of electronic documents and templates with DMS were analyzed based on data extracted from a university-affiliated hospital with EPR. As a result, it was found that the number of electronic documents as well as scanned documents circulating at the hospital tended to increase. The result indicated that replacement of paper-based documents with electronic documents did not occur. Therefore it was anticipated that the need for DMS would continue to increase in the hospital. The methods used this study to analyze the trend of DMS utilization would be applicable to other hospitals with with a variety of DMS implementation, such as electronic storage by scanning documents or paper preservation that is compatible with EPR.
Evaluation of Evidence-Based Nursing Pain Management Practice
Song, Wenjia; Eaton, Linda H.; Gordon, Debra B.; Hoyle, Christine; Doorenbos, Ardith Z.
2014-01-01
Background It is important to ensure that cancer pain management is based on the best evidence. Nursing evidence-based pain management can be examined through an evaluation of pain documentation. Aims This study aimed to (a) modify and test an evaluation tool for nursing cancer pain documentation, and (b) describe the frequency and quality of nursing pain documentation in one oncology unit via electronic medical system. Design and Setting A descriptive cross-sectional design was used for this study at an oncology unit of an academic medical center in the Pacific Northwest. Methods Medical records were examined for 37 adults hospitalized during April and May of 2013. Nursing pain documentations (N = 230) were reviewed using an evaluation tool modified from the Cancer Pain Practice Index to consist of 13 evidence-based pain management indicators, including pain assessment, care plan, pharmacologic and nonpharmacologic interventions, monitoring and treatment of analgesic side effects, communication with physicians, and patient education. Individual nursing documentation was assigned a score from 0 (worst possible) to 13 (best possible), to reflect the delivery of evidence-based pain management. Results The participating nurses documented 90% of the recommended evidence-based pain management indicators. Documentation was suboptimal for pain reassessment, pharmacologic interventions, and bowel regimen. Conclusions The study results provide implications for enhancing electronic medical record design and highlight a need for future research to understand the reasons for suboptimal nursing documentation of cancer pain management. For the future use of the data evaluation tool, we recommend additional modifications according to study settings. PMID:26256215
Management self assessment plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Debban, B.L.
Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled tomore » begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.« less
Spent Nuclear Fuel Project Configuration Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reilly, M.A.
This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.
Code of Federal Regulations, 2010 CFR
2010-04-01
... following: (a) Successful completion of a planning phase and a planning report. The requirements for both of these are described in § 1000.19 and § 1000.20. A Consortium's planning activities satisfy this... financial stability and financial management capability for the previous 3 fiscal years. This will be done...
Groundwater regulation and integrated planning
Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.
2016-01-01
The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses to prepare Mississippi vocational students for…
Planning the School Library Media Center Budget.
ERIC Educational Resources Information Center
Buckingham, Betty Jo; McCurdy, Susan
As a result of an Iowa state mandate for budgeting of school library media centers, the publication "Planning the School Library Media Center Budget" was updated in 1991. Since that time, the Uniform Financial Accounting's document has phased in a management information system which includes different numbers and dimensions from those…
Formulation of consumables management models. Consumables flight planning worksheet utilization
NASA Technical Reports Server (NTRS)
Newman, C. M.
1977-01-01
The updated and reformatted consumables flight planning worksheet is documented. An instruction set for applying the worksheet, and a sample application of the worksheet is disclosed. The particular application is for the STS interfacing with sortie payloads and typifies the interfacing of the delivery system and payloads.
NASA Technical Reports Server (NTRS)
Newman, C. M.
1977-01-01
The updated consumables flight planning worksheet (CFPWS) is documented. The update includes: (1) additional consumables: ECLSS ammonia, APU propellant, HYD water; (2) additional on orbit activity for development flight instrumentation (DFI); (3) updated use factors for all consumables; and (4) sources and derivations of the use factors.
U.S. Department of Education Federal Student Aid Five-Year Plan, 2006-2010
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
This document reflects Federal Student Aid's solid progress in meeting strategic objectives since becoming a Performance-Based Organization. Specifically, the plan addresses continuing efforts to increase program integrity, improve customer service and achieve measurable results in the management and administration of the Title IV student…
Evaluation of Evidence-based Nursing Pain Management Practice.
Song, Wenjia; Eaton, Linda H; Gordon, Debra B; Hoyle, Christine; Doorenbos, Ardith Z
2015-08-01
It is important to ensure that cancer pain management is based on the best evidence. Nursing evidence-based pain management can be examined through an evaluation of pain documentation. The aim of this study was to modify and test an evaluation tool for nursing cancer pain documentation, and describe the frequency and quality of nursing pain documentation in one oncology unit via the electronic medical system. A descriptive cross-sectional design was used for this study at an oncology unit of an academic medical center in the Pacific Northwest. Medical records were examined for 37 adults hospitalized during April and May 2013. Nursing pain documentations (N = 230) were reviewed using an evaluation tool modified from the Cancer Pain Practice Index to consist of 13 evidence-based pain management indicators, including pain assessment, care plan, pharmacologic and nonpharmacologic interventions, monitoring and treatment of analgesic side effects, communication with physicians, and patient education. Individual nursing documentation was assigned a score ranging from 0 (worst possible) to 13 (best possible), to reflect the delivery of evidence-based pain management. The participating nurses documented 90% of the recommended evidence-based pain management indicators. Documentation was suboptimal for pain reassessment, pharmacologic interventions, and bowel regimen. The study results provide implications for enhancing electronic medical record design and highlight a need for future research to understand the reasons for suboptimal nursing documentation of cancer pain management. For the future use of the data evaluation tool, we recommend additional modifications according to study settings. Copyright © 2015 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.
Factors associated with integrating self-management support into primary care.
Crespo, Richard; Shrewsberry, Molly
2007-06-01
The purpose of this article is to expand the understanding of self-management support by describing factors that contribute to implementing a comprehensive self-management program in primary care. Four rural health centers in medically underserved areas participated in a study to document the implementation of a self-management program. This program consisted of a social marketing plan and decision-making tools to guide patients in making self-management behavior changes. The stages of change constructs of the transtheoretical model were used to design the social marketing plan. Key informant interviews were conducted at 6-month and 9-month intervals to document the implementation process. A standardized set of questions was used in the interviews. The data from the interviews were analyzed using content analysis techniques. One of the principle findings is that self-management support requires putting a system in place, not just adding a new component to primary care. The health centers that fully implemented the self-management program made an organizational commitment to keep self-management on the agenda in management meetings, clinical staff set the example by adopting self-management behaviors, and patient self-management support was implemented in multiple patient care venues. Primary care centers with limited financial resources are able to integrate self-management support into their system of chronic illness care.
Semachew, Ayele
2018-03-13
The purpose of this survey was to evaluate the implementation of the nursing process at three randomly selected governmental hospitals found in Amhara Region North West Ethiopia. From the total 338 reviewed documents, 264 (78.1%) have a nursing process format attached with the patient's profile/file, 107 (31.7%) had no nursing diagnosis, 185 (54.7%) of nurses stated their plan of care based on priority, 173 (51.2%) of nurses did not document their interventions based on plan and 179 (53.0%) of nurses did not evaluate their interventions. The overall implementation of nursing process among Felege Hiwot Referal hospital, Debretabor general hospital and Finoteselam general hospitals were 49.12, 68.18, and 69.42% respectively. Nursing professionals shall improve documentation required in implementing the nursing process. Nursing managers (matron, ward heads) shall supervise the overall implementation of nursing process. Hospital nursing services managers (matrons) shall arrange and facilitate case presentations by the nursing staffs which focus on documentation and updates on nursing process. Hospitals need to establish and support nursing process coordinating staff in their institution.
Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less
Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Shane
Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less
Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A) software management plan
NASA Technical Reports Server (NTRS)
Schwantje, Robert
1994-01-01
This document defines the responsibilites for the management of the like-cycle development of the flight software installed in the AMSU-A instruments, and the ground support software used in the test and integration of the AMSU-A instruments.
Topical Backgrounder: Chemical Safety in Your Community: EPA's New Risk Management Program
This May 1999 document is part of a series of publications on the RMP and issues related to chemical emergency management. Explains how the RMP requirements pick up where the Emergency Planning and Community Right-to-Know Act left off.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Using and Maintaining Requirements Documents 211.273... representatives of the contractor, the Defense Contract Management Agency, the Defense Contract Audit Agency, and...
Higgins, Agnes; Doyle, Louise; Morrissey, Jean; Downes, Carmel; Gill, Ailish; Bailey, Sive
2016-08-01
Despite the articulated need for policies and processes to guide risk assessment and safety planning, limited guidance exists on the processes or procedures to be used to develop such policies, and there is no body of research that examines the quality or content of the risk-management policies developed. The aim of the present study was to analyse the policies of risk and safety management used to guide mental health nursing practice in Ireland. A documentary analysis was performed on 123 documents received from 22 of the 23 directors of nursing contacted. Findings from the analysis revealed a wide variation in how risk, risk assessment, and risk management were defined. Emphasis within the risk documentation submitted was on risk related to self and others, with minimal attention paid to other types of risks. In addition, there was limited evidence of recovery-focused approaches to positive risk taking that involved service users and their families within the risk-related documentation. Many of the risk-assessment tools had not been validated, and lacked consistency or guidance in relation to how they were to be used or applied. The tick-box approach and absence of space for commentary within documentation have the potential to impact severely on the quality of information collected and documented, and subsequent clinical decision-making. Managers, and those tasked with ensuring safety and quality, need to ensure that policies and processes are, where possible, informed by best evidence and are in line with national mental health policy on recovery. © 2016 Australian College of Mental Health Nurses Inc.
Aviation System Analysis Capability Quick Response System Report
NASA Technical Reports Server (NTRS)
Roberts, Eileen; Villani, James A.; Ritter, Paul
1998-01-01
The purpose of this document is to present the additions and modifications made to the Aviation System Analysis Capability (ASAC) Quick Response System (QRS) in FY 1997 in support of the ASAC ORS development effort. This document contains an overview of the project background and scope and defines the QRS. The document also presents an overview of the Logistics Management Institute (LMI) facility that supports the QRS, and it includes a summary of the planned additions to the QRS in FY 1998. The document has five appendices.
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
Maya Quinones; William Gould; Carlos D. Rodriguez-Pedraza
2007-01-01
This report documents the type and source of geospatial data available for Haiti. It was compiled to serve as a resource for geographic information system (GIS)-based land management and planning. It will be useful for conservation planning, reforestation efforts, and agricultural extension projects. Our study indicates that there is a great deal of geospatial...
Planning guidance for the Chemical Stockpile Emergency Preparedness Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.
1995-02-01
This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less
ERIC Educational Resources Information Center
Clarke, Marion L., Ed.; Crysdale, Richard A., Ed.
An intensive 2-week recreation management institute plan, with proceedings of 20 sessions, is presented in this 1967 document. The primary goal of the institute was to provide systematic methods for (1) upgrading and improving the recreation knowledge of middle management recreation personnel and (2) developing or refining their recreation…
30 CFR 250.109 - What documents must I prepare and maintain related to welding?
Code of Federal Regulations, 2011 CFR
2011-07-01
... related to welding? 250.109 Section 250.109 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT... maintain related to welding? (a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has...
Asiki, Gershim; Shao, Shuai; Wainana, Carol; Khayeka-Wandabwa, Christopher; Haregu, Tilahun N; Juma, Pamela A; Mohammed, Shukri; Wambui, David; Gong, Enying; Yan, Lijing L; Kyobutungi, Catherine
2018-05-09
In Kenya, cardiovascular diseases (CVDs) accounted for more than 10% of total deaths and 4% of total Disability-Adjusted Life Years (DALYs) in 2015 with a steady increase over the past decade. The main objective of this paper was to review the existing policies and their content in relation to prevention, control and management of CVDs at primary health care (PHC) level in Kenya. A targeted document search in Google engine using keywords "Kenya national policy on cardiovascular diseases" and "Kenya national policy on non-communicable diseases (NCDs)" was conducted in addition to key informant interviews with Kenyan policy makers. Relevant regional and international policy documents were also included. The contents of documents identified were reviewed to assess how well they aligned with global health policies on CVD prevention, control and management. Thematic content analysis of the key informant interviews was also conducted to supplement the document reviews. A total of 17 documents were reviewed and three key informants interviewed. Besides the Tobacco Control Act (2007), all policy documents for CVD prevention, control and management were developed after 2013. The national policies were preceded by global initiatives and guidelines and were similar in content with the global policies. The Kenya health policy (2014-2030), The Kenya Health Sector Strategic and Investment Plan (2014-2018) and the Kenya National Strategy for the Prevention and Control of Non-communicable diseases (2015-2020) had strategies on NCDs including CVDs. Other policy documents for behavioral risk factors (The Tobacco Control Act 2007, Alcoholic Drinks Control (Licensing) Regulations (2010)) were available. The National Nutrition Action Plan (2012-2017) was available as a draft. Although Kenya has a tiered health care system comprising primary healthcare, integration of CVD prevention and control at PHC level was not explicitly mentioned in the policy documents. This review revealed important gaps in the policy environment for prevention, control and management of CVDs in PHC settings in Kenya. There is need to continuously engage the ministry of health and other sectors to prioritize inclusion of CVD services in PHC.
76 FR 32330 - Reducing Regulatory Burden; Retrospective Review Under Executive Order 13563
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-06
... and Human Services, Office of Documents and Regulations Management, 200 Independence Avenue, SW... they are outmoded, ineffective, insufficient, or excessively burdensome. The President required each agency to submit its preliminary plan to the Office of Management and Budget's Office of Information and...
Managing Colleges into the Next Century. Coombe Lodge Report.
ERIC Educational Resources Information Center
Brace, Diane; And Others
1990-01-01
This document contains seven papers about managing Great Britain's further education colleges in the next century. The papers examine a wide range of administrative issues, including building on human resources investments through strategic planning, maintaining relationships with local education authorities, customer satisfaction as a marketing…
Natural Disaster & Crisis Management in School Districts and Community Colleges.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.
This document provides school districts and community colleges in Florida with guidance on disaster preparedness planning and management for all types of disasters. Procedures include those for insurance coverage, emergency shelters, command centers and disaster team organization, emergency communications, security, preparation prior to disaster,…
ERIC Educational Resources Information Center
Brick, Michael, Ed.; Bushko, Andrew A., Ed.
The main body of this document consists of three presentations given at a conference on the management of change. The conference provided each participant the opportunity to formulate, plan, and implement desired change at particular institutions in a more sophisticated fashion. In the first presentation, three conceptual models of executive…
ERIC Educational Resources Information Center
Keep America Beautiful, Inc., New York, NY.
Corporations, government agencies, communities, and individuals are involved in waste management. Education about waste--where it comes from, how we dispose of it, and management alternatives--is needed. This document provides a series of educational resources which deal with these issues. Using these factsheets, lesson plans, lists of sources for…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
Revealing Adaptive Management of Environmental Flows
NASA Astrophysics Data System (ADS)
Allan, Catherine; Watts, Robyn J.
2018-03-01
Managers of land, water, and biodiversity are working with increasingly complex social ecological systems with high uncertainty. Adaptive management (learning from doing) is an ideal approach for working with this complexity. The competing social and environmental demands for water have prompted interest in freshwater adaptive management, but its success and uptake appear to be slow. Some of the perceived "failure" of adaptive management may reflect the way success is conceived and measured; learning, rarely used as an indicator of success, is narrowly defined when it is. In this paper, we document the process of adaptive flow management in the Edward-Wakool system in the southern Murray-Darling Basin, Australia. Data are from interviews with environmental water managers, document review, and the authors' structured reflection on their experiences of adaptive management and environmental flows. Substantial learning occurred in relation to the management of environmental flows in the Edward-Wakool system, with evidence found in planning documents, water-use reports, technical reports, stakeholder committee minutes, and refereed papers, while other evidence was anecdotal. Based on this case, we suggest it may be difficult for external observers to perceive the success of large adaptive management projects because evidence of learning is dispersed across multiple documents, and learning is not necessarily considered a measure of success. We suggest that documentation and sharing of new insights, and of the processes of learning, should be resourced to facilitate social learning within the water management sector, and to help demonstrate the successes of adaptive management.
Revealing Adaptive Management of Environmental Flows.
Allan, Catherine; Watts, Robyn J
2018-03-01
Managers of land, water, and biodiversity are working with increasingly complex social ecological systems with high uncertainty. Adaptive management (learning from doing) is an ideal approach for working with this complexity. The competing social and environmental demands for water have prompted interest in freshwater adaptive management, but its success and uptake appear to be slow. Some of the perceived "failure" of adaptive management may reflect the way success is conceived and measured; learning, rarely used as an indicator of success, is narrowly defined when it is. In this paper, we document the process of adaptive flow management in the Edward-Wakool system in the southern Murray-Darling Basin, Australia. Data are from interviews with environmental water managers, document review, and the authors' structured reflection on their experiences of adaptive management and environmental flows. Substantial learning occurred in relation to the management of environmental flows in the Edward-Wakool system, with evidence found in planning documents, water-use reports, technical reports, stakeholder committee minutes, and refereed papers, while other evidence was anecdotal. Based on this case, we suggest it may be difficult for external observers to perceive the success of large adaptive management projects because evidence of learning is dispersed across multiple documents, and learning is not necessarily considered a measure of success. We suggest that documentation and sharing of new insights, and of the processes of learning, should be resourced to facilitate social learning within the water management sector, and to help demonstrate the successes of adaptive management.
Putnam, James E.; Hansen, Cristi V.
2014-01-01
As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.
78 FR 23491 - National Forest System Land Management Planning; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
... April 19, 2013. ADDRESSES: Written inquiries about this correction document may be sent to the Director..., Indians, Intergovernmental relations, National forests, Reporting and recordkeeping requirements, Science...
Reference frameworks for the health management of measles, breast cancer and diabetes (type II).
Brand, Helmut; Schröder, Peter; Davies, John K; Escamilla, Ixhel; Hall, Caroline; Hickey, Kieran; Jelastopulu, Eleni; Mechtler, Reli; Yared, Wendy Tse; Volf, Jaroslav; Weihrauch, Birgit
2006-03-01
This paper presents reference frameworks which order effective and feasible policies and interventions for the health management of measles, breast cancer and diabetes (type II). These reference frameworks can be used to rapidly appraise regional health policy documents and existing health management systems. Furthermore, the reference frameworks can serve health policy makers for the planning of health management measures.
Defence Capability Plan 2006-2016
2006-06-14
and supply chain management ; and • developing strategies focussing on critical industry capabilities and Defence’s ability to manage supply and... managers undertake pre-approval study activity and prepare the necessary departmental documentation. More formal industry solicitation would continue...Defence Management Systems Improvement Less than $10m JP 2085 Phase 1B Explosive Ordnance Warstock $150m to $200m JP 2090 Phase 1B Combined Information
Manager's handbook for software development, revision 1
NASA Technical Reports Server (NTRS)
1990-01-01
Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.
ERIC Educational Resources Information Center
Goddard, Tessa; Murray, Jennifer
This self-instructional unit for supervisors and managers in the British hotel and catering industry contains information on all the important stages in the process of recruiting staff. The document begins with an introduction and advice on how to use the unit. Five sections cover the following topics: (1) the cost of employment; (2) planning for…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for metal trades I, IIA (advanced welding), and IIB (advanced machine shop).…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for horticulture I and II. Presented first are a program description and…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
... NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants... Procedures--General,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101340264... review of amendment applications and review of design certification and combined license applications for...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriculture production I and II. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in the building trades: building trades I and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for welding I and II. Presented first are a program description and course…
ERIC Educational Resources Information Center
Cleven, Arlene M.
The course guide has been prepared to aid in planning and conducting a training program in emergency medical care for first responders to traffic accidents (expected to be patrolling law enforcement officers). This document contains a detailed description of the training program; suggestions for course planning including class size, scheduling…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for agriscience I and II. Presented first are a program description and…
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
Recent population decline of the Marbled Murrelet in the Pacific Northwest
Sherri L. Miller; Martin G. Raphael; Gary A. Falxa; Craig Strong; Jim Baldwin; Thomas Bloxton; Beth M. Galleher; Monique Lance; Deanna Lynch; Scott F. Pearson; C. John Ralph; Richard D. Young
2012-01-01
We document here a decline of nearly 30% in the Marbled Murrelet (Brachyramphus marmoratus) population of Washington, Oregon, and northern California between 2000 and 2010. The Northwest Forest Plan is an ecosystem-management plan for federal forest lands in the Pacific Northwest of the United States that incorporates monitoring to determine if...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive mechanics I and II. Presented first are a program description…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for allied health I and II. Presented first are a program description and…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for the introduction to agriscience program. Presented first are a program…
A Quality Assurance Project Plan (QAPP) was prepared to document the primary objectives and data collection and interpretation efforts for two landfill bioreactor studies at the Outer Loop Landfill in Louisville, KY, operated by Waste Management, Inc. WMI). The two multi-year stu...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in electronics: electronics I and II.…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in carpentry: carpentry I and II. Presented…
Action Planning and Recording Achievement.
ERIC Educational Resources Information Center
Green, Muriel
This document examines strategies and procedures that British further education (FE) colleges can use to develop and enhance systems and structures for guiding and supporting learners and learning. It is based on the findings of a field test of the Managing Learning model for planning and recording the process of FE students. First, the importance…
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-12-01
The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less
Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success
NASA Astrophysics Data System (ADS)
Perera, Jeevan; Holsomback, Jerry D.
2005-12-01
Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, K.; Tsai, H.; Decision and Information Sciences
The technical basis for extending the Model 9977 shipping package periodic maintenance beyond the one-year interval to a maximum of five years is based on the performance of the O-ring seals and the environmental conditions. The DOE Packaging Certification Program (PCP) has tasked Argonne National Laboratory to develop a Radio-Frequency Identification (RFID) temperature monitoring system for use by the facility personnel at DAF/NTS. The RFID temperature monitoring system, depicted in the figure below, consists of the Mk-1 RFId tags, a reader, and a control computer mounted on a mobile platform that can operate as a stand-alone system, or it canmore » be connected to the local IT network. As part of the Conditions of Approval of the CoC, the user must complete the prescribed training to become qualified and be certified for operation of the RFID temperature monitoring system. The training course will be administered by Argonne National Laboratory on behalf of the Headquarters Certifying Official. This is a complete documentation package for the RFID temperature monitoring system of the Model 9977 packagings at NTS. The documentation package will be used for training and certification. The table of contents are: Acceptance Testing Procedure of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Acceptance Testing Result of MK-1 RFID Tags for DOE/EM Nuclear Materials Management Applications; Performance Test of the Single Bolt Seal Sensor for the Model 9977 Packaging; Calibration of Built-in Thermistors in RFID Tags for Nevada Test Site; Results of Calibration of Built-in Thermistors in RFID Tags; Results of Thermal Calibration of Second Batch of MK-I RFID Tags; Procedure for Installing and Removing MK-1 RFID Tag on Model 9977 Drum; User Guide for RFID Reader and Software for Temperature Monitoring of Model 9977 Drums at NTS; Software Quality Assurance Plan (SQAP) for the ARG-US System; Quality Category for the RFID Temperature Monitoring System; The Documentation Package for the RFID Temperature Monitoring System; Software Test Plan and Results for ARG-US OnSite; Configuration Management Plan (CMP) for the ARG-US System; Requirements Management Plan for the ARG-US System; and Design Management Plan for ARG-US.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise
2006-09-01
The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR 1.3.2 and 1.3.6 and to a Department of Energy document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines. This document also identifies ASC management and software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.
IPG Job Manager v2.0 Design Documentation
NASA Technical Reports Server (NTRS)
Hu, Chaumin
2003-01-01
This viewgraph presentation provides a high-level design of the IPG Job Manager, and satisfies its Master Requirement Specification v2.0 Revision 1.0, 01/29/2003. The presentation includes a Software Architecture/Functional Overview with the following: Job Model; Job Manager Client/Server Architecture; Job Manager Client (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Job Manager Server (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Development Environment; Project Plan; Requirement Traceability.
Microgravity strategic planning exercise
NASA Technical Reports Server (NTRS)
Halpern, Richard; Downey, Jim; Harvey, Harold
1991-01-01
The Center for Space and Advanced Technology supported a planning exercise for the Microgravity Program management at the Marshall Space Flight Center. The effort focused on the status of microgravity work at MSFC and elsewhere with the objective of preparing a goal-oriented strategic planning document which could be used for informational/brochure purposes. The effort entailed numerous interactions and presentations with Field Center programmatic components and Headquarters personnel. Appropriate material was consolidated in a draft format for a MSFC Strategic Plan.
We Scrum Every Day: Using Scrum Project Management Framework for Group Projects
ERIC Educational Resources Information Center
Pope-Ruark, Rebecca
2012-01-01
Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…
Using a Course Management System to Improve Classroom Communication
ERIC Educational Resources Information Center
Perkins, Matthew; Pfaffman, Jay
2006-01-01
Course management systems (CMSs) enable teachers to easily post assignments, lesson plans, announcements, and course documents. They also allow students to participate in online discussions and chats and turn in assignments online. Unfortunately, commercial systems are often expensive to purchase and maintain, removing them from the reach of many…
Space Geodesy Project Information and Configuration Management Procedure
NASA Technical Reports Server (NTRS)
Merkowitz, Stephen M.
2016-01-01
This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.
7 CFR 1484.33 - Must Cooperators follow certain financial management guidelines?
Code of Federal Regulations, 2010 CFR
2010-01-01
... management system that conforms to generally accepted accounting principles. (b) A Cooperator shall institute... documents relating to program activities for 5 calendar years following the end of the applicable marketing... that allows it to provide information by marketing plan year, country or region, activity number, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-02
... data about visitors that can be used to prepare resource management planning documents. Lessons learned... Information Collection; Comment Request; Cape Lookout National Park Visitor and Community Survey AGENCY...) will ask the Office of Management and Budget (OMB) to approve the Information Collection (IC) described...
Environmental Technology Verification Program Quality Management Plan, Version 3.0
The ETV QMP is a document that addresses specific policies and procedures that have been established for managing quality-related activities in the ETV program. It is the “blueprint” that defines an organization’s QA policies and procedures; the criteria for and areas of QA appli...
Data Element Dictionary: Staff. Second Edition.
ERIC Educational Resources Information Center
Martin, James S.
This document is intended to serve as a guide for institutions in the development of data bases to support the implementation of planning and management systems. This publication serves to identify and describe those staff-related data elements: (1) required to support current National Center for Higher Education Management Systems (NCHEMS)…
Data Element Dictionary: Facilities. Second Edition.
ERIC Educational Resources Information Center
Martin, James S.
This document is intended to serve as a guide for institutions in the development of data bases to support the implementation of planning and management systems. This publication serves to identify and describe those facilities-related data elements: (1) required to support current National Center for Higher Education Management Systems (NCHEMS)…
Data Element Dictionary: Course. Second Edition.
ERIC Educational Resources Information Center
Martin, James S.
This document is intended to serve as a guide for institutions in the development of data bases to support the implementation of planning and management systems. This publication serves to identify and describe those course-related data elements: (1) required to support current National Center for Higher Education Management Systems (NCHEMS)…
Data Element Dictionary: Finance. Second Edition.
ERIC Educational Resources Information Center
Martin, James S.
This document is intended to serve as a guide for institutions in the development of data bases to support the implementation of planning and management systems. This publication serves to identify and describe those finance-related data elements: (1) required to support current National Center for Higher Education Management Systems (NCHEMS)…
A Wildlife Habitat Improvement Plan.
ERIC Educational Resources Information Center
Rogers, S. Elaine
The document presents an overview of Stony Acres, a "sanctuary" for wildlife as well as a place for recreation enjoyment and education undertakings. A review of the history of wildlife habitat management at Stony Acres and the need for continued and improved wildlife habitat management for the property are discussed in Chapter I. Chapter…
78 FR 4836 - Endangered and Threatened Species; Take of Anadromous Fish
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-23
...NMFS has evaluated the Tribal Resource Management Plan (Plan) submitted by the Shoshone-Bannock Tribes (Tribes) to NMFS pursuant to the limitation on take prohibitions for actions conducted under the Tribal Rule of section 4(d) for salmon and steelhead promulgated under the Endangered Species Act (ESA). The plan specifies fishery management activities in the Salmon River sub basin of Idaho. This document serves to notify the public that NMFS, by delegated authority from the Secretary of Commerce, has determined pursuant to the ESA Tribal 4(d) Rule for salmon and steelhead that implementing and enforcing the Plan will not appreciably reduce the likelihood of survival and recovery of ESA-listed salmon and steelhead.
Project management plan for asbestos control at Randolph Air Force Base
DOE Office of Scientific and Technical Information (OSTI.GOV)
Broers, G.J.
1988-02-01
The United States Air Force Air Training Command (ATC) Headquarters requested assistance from the Idaho National Engineering Laboratory (INEL) in February, 1987 to develop processes and procedures and provide program management to minimize and control asbestos hazard at its thirteen bases. This effort was requested by the ATC to comply with Executive Order 12088 under which the USAF is directed to meet all applicable federal, state, and local environmental regulations. In response to that request the efforts identified within this document provide the ATC with a thorough base-wide Asbestos Survey Report, an Asbestos Management Plan and an Operations and Maintenancemore » Plan for Randolph AFB which, when implemented, will comply with current and anticipated federal laws and provide the base with accurate information needed for long range asbestos management. The other twelve bases will be surveyed and sampled in the four years to follow with appropriate asbestos management plans developed for each. 6 figs.« less
Institutional plan. Fiscal year, 1997--2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-10-01
The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.
Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
PARSONS, J.E.
1999-10-28
The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; andmore » protect human health and the environment.« less
The General Mission Analysis Tool (GMAT) System Test Plan
NASA Technical Reports Server (NTRS)
Conway, Darrel J.; Hughes, Steven P.
2007-01-01
This document serves as the System Test Approach for the GMAT Project. Preparation for system testing consists of three major stages: 1) The Test Approach sets the scope of system testing, the overall strategy to be adopted, the activities to be completed, the general resources required and the methods and processes to be used to test the release. It also details the activities, dependencies and effort required to conduct the System Test. 2) Test Planning details the activities, dependencies and effort required to conduct the System Test. 3) Test Cases documents the tests to be applied, the data to be processed, the automated testing coverage and the expected results. This document covers the first two of these items, and established the framework used for the GMAT test case development. The test cases themselves exist as separate components, and are managed outside of and concurrently with this System Test Plan.
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
State-local policy management project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-08-01
The report describes case studies to explore new approaches for increasing state and local coordination in planning and managing programs in areas with significant scientific and technical components such as energy and environment. Specifically, the case studies reveal efforts of various states in the areas of energy conservation, weatherization, emergency preparedness, and air quality. Successes and failures of Maryland's decentralized approach to energy conservation are documented; success of the thermal and lighting efficiency standards program in Texas is discussed; state aid for local energy conservation programs in Clinton County, Michigan, is reviewed; and the success of the weatherization program inmore » Oregon is examined. Pilot programs in weatherization in Pennsylvania are shown to have led a statewide effort. Two Minnesota projects in emergency preparedness are documented and factors for success are listed. In addition, long-range planning for fuel shortages in New York is examined and the benefits of regional planning in Fairfax County, Virgina, are noted. Efforts are examined to improve air quality in Ohio, California, and New Jersey.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-21
... effective 12:01 a.m., local time on July 1, 2012, until 12:01 a.m., local time on January 1, 2013. ADDRESSES: Electronic copies of documents supporting the final temporary rule implementing gray triggerfish management... . SUPPLEMENTARY INFORMATION: The reef fish fishery of the Gulf is managed under the Fishery Management Plan for...
7 CFR 1710.152 - Primary support documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... capital investments required to serve a borrower's planned new loads, improve service reliability and... manager to guide the system toward its financial goals. The forecast submitted in support of a loan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energy’s (DOE’s) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LM’s goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer ofmore » records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.« less
Sandia National Laboratories California Waste Management Program Annual Report February 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brynildson, Mark E.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.
An Evaluation of Leadership and Management Training in the United States Coast Guard
1982-07-06
organizational behavior, operations. research, system theory, applied management P-nalysik, and other courses in economics, planning, and financial management ...continued existence in a period of severe financial stress. 3. If there is no positive impact, document this so that top- management in t•he Coast...Relations InstituIte 5. Drug Education Specialist course 6. U. S. Navy Managkment course 7. A Management course og another service 8. Other formal
Sellars, Marcus; Detering, Karen M; Silvester, William
2015-04-23
Advance care planning (ACP) is the process of planning for future healthcare that is facilitated by a trained healthcare professional, whereby a person's values, beliefs and treatment preferences are made known to guide clinical decision-making at a future time when they cannot communicate their decisions. Despite the potential benefits of ACP for community aged care clients the availability of ACP is unknown, but likely to be low. In Australia many of these clients receive services through Home Care Package (HCP) programs. This study aimed to explore current attitudes, knowledge and practice of advance care planning among HCP service managers and case managers. An invitation to take part in a cross-sectional online survey was distributed by email to all HCP services across Australia in November 2012. Descriptive analyses were used to examine overall patterns of responses to each survey item in the full sample. 120 (response rate 25%) service managers and 178 (response rate 18%) case managers completed the survey. Only 34% of services had written ACP policies and procedures in place and 48% of case managers had previously completed any ACP training. In addition, although most case managers (70%) had initiated an ACP discussion in the past 12 months and viewed ACP as part of their role, the majority of the conversations (80%) did not result in documentation of the client's wishes and most (85%) of the case managers who responded did not believe ACP was done well within their service. This survey shows low organisational ACP systems and support for case managers and a lack of a normative approach to ACP across Australian HCP services. As HCPs become more prevalent it is essential that a model of ACP is developed and evaluated in this setting, so that clients have the opportunity to discuss and document their future healthcare wishes if they choose to.
ERIC Educational Resources Information Center
Jones, Peter
This self-instructional unit for supervisors and managers in the British hotel and catering industry is intended to consolidate work covered in a 1-day course. The document begins with an introduction and advice on how to use the unit. The following topics are covered in the unit: (1) planning the menu; (2) food production systems; (3) kitchen…
NASA Technical Reports Server (NTRS)
1979-01-01
Application software intended to reduce the man-hours required per flight design cycle by producing major flight design documents with little or no manual typing is described. The documentation support software is divided into two separately executable processors. However, since both processors support the same overall functions, and most of the software contained in one is also contained in the other, both are collectively presented.
Davidson, Anne; McKerrow, Alexa; Long, Don; Earnhardt, Todd
2015-01-01
The intended target audience for this document initially is management and project technical specialist and scientists involved in the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - (LANDFIRE) program to help communicate coordination activities to all involved parties. This document is also intended to give background information in other parts of the USGS and beyond, although some details given are relatively oriented to management of the respective programs. Because the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - LANDFIRE programs both rely on characterizations of land cover using similar scales and resolutions, the programs have been coordinating their work to improve scientific consistency and efficiency of production. Initial discussions and informal sharing of ideas and work began in 2008. Although this collaboration was fruitful, there was no formal process for reporting results, plans, or outstanding issues, nor was there any formally-defined coordinated management team that spanned the two programs. In 2012, leadership from the two programs agreed to strengthen the coordination of their respective work efforts. In 2013 the GAP and LANDFIRE programs developed an umbrella plan of objectives and components related to three mutual focus areas for the GAP and LANDFIRE collaboration for the years 2013 and 2014 (GAP/LANDFIRE 2013). The evolution of this partnership resulted in the drafting of an inter-program Memorandum of Understanding (MOU) in 2014. This MOU identified three coordination topics relevant to the two programs participating at this point in the MOU history: Vegetation mappingDisturbance classesFormal quality assessment
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for automotive body repair I and II. Presented first are a program…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for small engine repair I and II. Presented first are a program description…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for secondary-level courses in business and computer technology I-II.…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for marketing I-II and fashion merchandising. Presented first are a program…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-09
... NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants... Procedures--General,'' (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110100193... associated with the review of amendment applications and review of design certification and combined license...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in brick, block, and stonemasonry: brick,…
Implementation plan for HANDI 2000 TWRS master equipment list
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.
Major Events Leading to Establishment of The National Task Bank.
ERIC Educational Resources Information Center
Upjohn (W.E.) Inst. for Employment Research, Washington, DC.
This document describes how the plan for a National Task Bank evolved as part of an effort to encourage State and local public welfare agencies to adopt new approaches to staff planning and utilization. The task bank is an outgrowth of the application of systems approach and functional job analysis to agency management. Individualized data banks…
DOT National Transportation Integrated Search
1997-08-01
This document provides guidelines for the review of state ITS/CVO business plans by the FHWA. The purpose of the review is to ensure that the state business plans have been developed in a manner consistent with the FHWAs intent in awarding ITS/CVO...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Region, what planning information must accompany the DPP? 250.251 Section 250.251 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE... Development Operations Coordination Documents (docd) § 250.251 If I propose activities in the Alaska OCS...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for diesel engine mechanics I and II. Presented first are a program…
Remote sensing techniques aid in preattack planning for fire management
Lucy Anne Salazar
1982-01-01
Remote sensing techniques were investigated as an alternative for documenting selected prettack fire planning information. Locations of fuel models, road systems, and water sources were recorded by Landsat satellite imagery and aerial photography for a portion of the Six Rivers National Forest in northwestern California. The two fuel model groups used were from the...
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for forestry I and II. Presented first are a program description and course…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for family and consumer sciences and related technology (enrichment).…
ERIC Educational Resources Information Center
Rasheed, Saleem A.; Fore, Cecil, III; Jones, Arthur; Smith, Latisha
2012-01-01
The research literature on the use of Functional Behavioral Assessments (FBA) to develop Behavior Intervention Plans (BIP) for students with emotional/behavioral disorders, who present problem classroom behaviors for use in the schools, is well documented. There are school-wide, district-wide, and state-wide plans that are currently being…
New Challenges for Strategy Development in Irish Higher Education Institutions
ERIC Educational Resources Information Center
Lillis, Deirdre; Lynch, Marion
2014-01-01
Strategic planning has become an integral part of the management of higher education institutions worldwide. The experiences of all but one of the Republic of Ireland's 21 universities and institutes of technology with strategic planning are explored from 2000 to 2010. At the starting point in 2000, only two institutions had a documented strategic…
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for machine tool operation/machine shop I and II. Presented first are a…
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Izmaylov, Alexander; Babkin, Vladimir; Shemigon, Nikolai N.
2012-07-14
This paper describes issues related to upgrading the physical protection regulatory basis for Rosatom State Corporation sites. It is underlined that most of the regulatory and methodological documents for this subject area have been developed under the U.S.-Russian MPC&A Program. According to the joint management plan developed and agreed upon by the parties in 2005, nearly 50 physical protection documents were identified to be developed, approved and implemented at Rosatom sites by 2012. It is also noted that, on the whole, the plans have been fulfilled.
NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)
NASA Technical Reports Server (NTRS)
Hoover, Jay C.
2004-01-01
Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.
ERIC Educational Resources Information Center
Schwartz, Stanley F.
This publication introduces electronic document imaging systems and provides guidance for local governments in New York in deciding whether such systems should be adopted for their own records and information management purposes. It advises local governments on how to develop plans for using such technology by discussing its advantages and…
Read-Brown, Sarah; Sanders, David S; Brown, Anna S; Yackel, Thomas R; Choi, Dongseok; Tu, Daniel C; Chiang, Michael F
2013-01-01
Efficiency and quality of documentation are critical in surgical settings because operating rooms are a major source of revenue, and because adverse events may have enormous consequences. Electronic health records (EHRs) have potential to impact surgical volume, quality, and documentation time. Ophthalmology is an ideal domain to examine these issues because procedures are high-throughput and demand efficient documentation. This time-motion study examines nursing documentation during implementation of an EHR operating room management system in an ophthalmology department. Key findings are: (1) EHR nursing documentation time was significantly worse during early implementation, but improved to a level near but slightly worse than paper baseline, (2) Mean documentation time varied significantly among nurses during early implementation, and (3) There was no decrease in operating room turnover time or surgical volume after implementation. These findings have important implications for ambulatory surgery departments planning EHR implementation, and for research in system design.
Read-Brown, Sarah; Sanders, David S.; Brown, Anna S.; Yackel, Thomas R.; Choi, Dongseok; Tu, Daniel C.; Chiang, Michael F.
2013-01-01
Efficiency and quality of documentation are critical in surgical settings because operating rooms are a major source of revenue, and because adverse events may have enormous consequences. Electronic health records (EHRs) have potential to impact surgical volume, quality, and documentation time. Ophthalmology is an ideal domain to examine these issues because procedures are high-throughput and demand efficient documentation. This time-motion study examines nursing documentation during implementation of an EHR operating room management system in an ophthalmology department. Key findings are: (1) EHR nursing documentation time was significantly worse during early implementation, but improved to a level near but slightly worse than paper baseline, (2) Mean documentation time varied significantly among nurses during early implementation, and (3) There was no decrease in operating room turnover time or surgical volume after implementation. These findings have important implications for ambulatory surgery departments planning EHR implementation, and for research in system design. PMID:24551402
Leveraging Interactive Patient Care Technology to Improve Pain Management Engagement.
Rao-Gupta, Suma; Kruger, David; Leak, Lonna D; Tieman, Lisa A; Manworren, Renee C B
2018-06-01
Most children experience pain in hospitals; and their parents report dissatisfaction with how well pain was managed. Engaging patients and families in the development and evaluation of pain treatment plans may improve perceptions of pain management and hospital experiences. The aim of this performance improvement project was to engage patients and families to address hospitalized pediatric patients' pain using interactive patient care technology. The goal was to stimulate conversations about pain management expectations and perceptions of treatment plan effectiveness among patients, parents, and health care teams. Plan-Do-Study-Act was used to design, develop, test, and pilot new workflows to integrate the interactive patient care technology system with the automated medication dispensing system and document actions from both systems into the electronic health record. The pediatric surgical unit and hematology/oncology unit of a free-standing, university-affiliated, urban children's hospital were selected to pilot this performance improvement project because of the high prevalence of pain from surgeries and hematologic and oncologic diseases, treatments, and invasive procedures. Documentation of pain assessments, nonpharmacologic interventions, and evaluation of treatment effectiveness increased. The proportion of positive family satisfaction responses for pain management significantly increased from fiscal year 2014 to fiscal year 2016 (p = .006). By leveraging interactive patient care technologies, patients and families were engaged to take an active role in pain treatment plans and evaluation of treatment outcomes. Improved active communication and partnership with patients and families can effectively change organizational culture to be more sensitive to patients' pain and patients' and families' hospital experiences. Copyright © 2017 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.
Space Station Freedom (SSF) Data Management System (DMS) performance model data base
NASA Technical Reports Server (NTRS)
Stovall, John R.
1993-01-01
The purpose of this document was originally to be a working document summarizing Space Station Freedom (SSF) Data Management System (DMS) hardware and software design, configuration, performance and estimated loading data from a myriad of source documents such that the parameters provided could be used to build a dynamic performance model of the DMS. The document is published at this time as a close-out of the DMS performance modeling effort resulting from the Clinton Administration mandated Space Station Redesign. The DMS as documented in this report is no longer a part of the redesigned Space Station. The performance modeling effort was a joint undertaking between the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) Flight Data Systems Division (FDSD) and the NASA Ames Research Center (ARC) Spacecraft Data Systems Research Branch. The scope of this document is limited to the DMS core network through the Man Tended Configuration (MTC) as it existed prior to the 1993 Clinton Administration mandated Space Station Redesign. Data is provided for the Standard Data Processors (SDP's), Multiplexer/Demultiplexers (MDM's) and Mass Storage Units (MSU's). Planned future releases would have added the additional hardware and software descriptions needed to describe the complete DMS. Performance and loading data through the Permanent Manned Configuration (PMC) was to have been included as it became available. No future releases of this document are presently planned pending completion of the present Space Station Redesign activities and task reassessment.
Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza
2014-09-28
Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.
Strategic Planning, Implementation, and Evaluation Processes in Hospital Systems: A Survey From Iran
Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza
2015-01-01
Aim & Background: Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. Methods: The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. Results: All the investigated hospitals had a strategic plan. The obtained percentages for the items “the rate of the compliance to requirements” and “the quantity of planning facilitators” (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). Conclusion: According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved. PMID:25716385
Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen
This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less
Documenting historical data and accessing it on the World Wide Web
Malchus B. Baker; Daniel P. Huebner; Peter F. Ffolliott
2000-01-01
New computer technologies facilitate the storage, retrieval, and summarization of watershed-based data sets on the World Wide Web. These data sets are used by researchers when testing and validating predictive models, managers when planning and implementing watershed management practices, educators when learning about hydrologic processes, and decisionmakers when...
ERIC Educational Resources Information Center
Davlatov, Ismail D.; Mulloev, Sharif M.
This book provides an indepth description and analysis of financial management and budgetary procedures for education in Tajikistan. This country's case is exceptional even for the group of newly independent post-Soviet countries. In addition to the difficulties of the transition period similar for all former centrally planned economies…
Report of the First National Conference on PPBES in Education, June 10, 1969.
ERIC Educational Resources Information Center
Foster, Charles W., Ed.
This document contains proceedings of a conference that presented a design for applying a program planning-budgeting-evaluating system (PPBES) to educational management. Included are (1) the keynote address, tracing the origin and future of program budgeting; (2) the presentation of the educational management design developed by the Research…
ERIC Educational Resources Information Center
Bouapao, Lytou; Sengchandavong, Ouam; Sihavong, Siphandone
This study provides an indepth description of financial management and budgetary procedures for education as well as a detailed analysis of major problems, recent developments, and new issues in Cambodia, Laos, and Vietnam. Laos, formerly one of the centrally planned economies, was previously considered "dormant" because of its limited…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... visitors that can be used to prepare resource management planning documents. II. Data OMB Control Number...: We (National Park Service) will ask the Office of Management and Budget (OMB) to approve the... visitor groups and local community members about the values they place on cultural and natural resources...
Aging management program of the reactor building concrete at Point Lepreau Generating Station
NASA Astrophysics Data System (ADS)
Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.
2011-04-01
In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.
Balancing Plan-Driven and Agile Methods in Software Engineering Project Courses
NASA Astrophysics Data System (ADS)
Boehm, Barry; Port, Dan; Winsor Brown, A.
2002-09-01
For the past 6 years, we have been teaching a two-semester software engineering project course. The students organize into 5-person teams and develop largely web-based electronic services projects for real USC campus clients. We have been using and evolving a method called Model- Based (System) Architecting and Software Engineering (MBASE) for use in both the course and in industrial applications. The MBASE Guidelines include a lot of documents. We teach risk-driven documentation: if it is risky to document something, and not risky to leave it out (e.g., GUI screen placements), leave it out. Even so, students tend to associate more documentation with higher grades, although our grading eventually discourages this. We are always on the lookout for ways to have students learn best practices without having to produce excessive documentation. Thus, we were very interested in analyzing the various emerging agile methods. We found that agile methods and milestone plan-driven methods are part of a “how much planning is enough?” spectrum. Both agile and plan-driven methods have home grounds of project characteristics where they clearly work best, and where the other will have difficulties. Hybrid agile/plan-driven approaches are feasible, and necessary for projects having a mix of agile and plan-driven home ground characteristics. Information technology trends are going more toward the agile methods' home ground characteristics of emergent requirements and rapid change, although there is a concurrent increase in concern with dependability. As a result, we are currently experimenting with risk-driven combinations of MBASE and agile methods, such as integrating requirements, test plans, peer reviews, and pair programming into “agile quality management.”
Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parr, P.D.; Evans, J.W.
1992-06-01
A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.« less
Emergency Response Capability Baseline Needs Assessment - Compliance Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharry, John A.
This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by LLNL Emergency Management Department Head, James Colson. This document is the second of a two-part analysis on Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2016 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2016more » BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. The 2013 BNA was approved by NNSA’s Livermore Field Office on January 22, 2014.« less
Phased Project Planning Guidelines
NASA Technical Reports Server (NTRS)
1968-01-01
NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farmer, Carl J.
Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.
Database management systems for process safety.
Early, William F
2006-03-17
Several elements of the process safety management regulation (PSM) require tracking and documentation of actions; process hazard analyses, management of change, process safety information, operating procedures, training, contractor safety programs, pre-startup safety reviews, incident investigations, emergency planning, and compliance audits. These elements can result in hundreds of actions annually that require actions. This tracking and documentation commonly is a failing identified in compliance audits, and is difficult to manage through action lists, spreadsheets, or other tools that are comfortably manipulated by plant personnel. This paper discusses the recent implementation of a database management system at a chemical plant and chronicles the improvements accomplished through the introduction of a customized system. The system as implemented modeled the normal plant workflows, and provided simple, recognizable user interfaces for ease of use.
Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giffen, Neil R
This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department ofmore » Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.« less
2015-05-01
in consultation with the site management . 4.0 DATA TYPES AND QUALITY CONTROL A sampling plan must account for the collection, handling, and...GUIDANCE DOCUMENT Cost-Effective, Ultra-Sensitive Groundwater Monitoring for Site Remediation and Management : Standard Operating Procedures...Groundwater Monitoring for Site Remediation and Management 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Halden, R.U., Roll, I.B. 5d
Master Pump Shutdown MPS Software Quality Assurance Plan (SQAP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
BEVINS, R.R.
2000-09-20
The MPSS Software Quality Assurance (SQAP) describes the tools and strategy used in the development of the MPSS software. The document also describes the methodology for controlling and managing changes to the software.
CAPR - Theresa Guerin | Center for Cancer Research
Theresa Guerin oversees animal colony management and provides support in breeding experimental animal cohort, preparing documentation for CAPR preclinical studies, as well as assistance in designing drug treatment plans. She also maintains multiple database resources. Expertise
Eastern Washington Intermodal Transportation Study Scope of Work
DOT National Transportation Integrated Search
1993-02-04
This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...
Test plan : I-40 TTIS tourist intercept survey
DOT National Transportation Integrated Search
1998-06-01
This document assembles best practices and presents practical advice on how to acquire the software components of Intelligent Transportation Systems (ITS). The intended audience is the "customers" - the project leaders, technical contract managers, d...
ERIC Educational Resources Information Center
Proceedings of the ASIS Annual Meeting, 1996
1996-01-01
Includes abstracts of special interest group (SIG) sessions. Highlights include digital imagery; text summarization; browsing; digital libraries; icons and the Web; information management; curricula planning; interfaces; information systems; theories; scholarly and scientific communication; global development; archives; document delivery;…
An annotated bibliography on river recreation.
Dorothy H Anderson; Earl C. Leatherberry; David W. Lime
1978-01-01
River recreation is experiencing widespread growth and popularity and, as a result, has become a major area for planning, management, and research. More than 300 citations documenting various aspects of the river recreation resource are presented.
Peregrine falcon management plan 2002-2007
DOT National Transportation Integrated Search
2002-01-01
The Oregon Department of Transportation (ODOT) owns and maintains facilities that have or are located near nesting territories for the American peregrine falcon (Falco peregrinus anatum), which is listed as endangered in Oregon. This document will se...
A survey of anti-icing practice in Virginia.
DOT National Transportation Integrated Search
1997-01-01
This study documents the current Virginia Department of Transportation's anti-icing practice so that development of a coordinated statewide plan for implementing anti-icing technology can be considered. The researcher surveyed VDOT managers to determ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).
Emergency management training program: Guide to good practice
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-07-01
The Emergency Management Training Program Guide to Good Practice is a project of the Training Resources and Data Exchange (TRADE) Emergency Management Issues Special Interest Group (EMI SIG). EMI SIG members expressed interest in a resource to assist in development of a comprehensive emergency management training program. This publication provides guidelines, methods, and materials for EMI SIG members to use, assisting in complete and effective emergency management programs. The purposes of the Emergency Management Training Program Guide to Good Practice are: Provide guidance in the development and management of Emergency Management (EM) training programs; Assist EM trainers to incorporate componentsmore » of the DOE Emergency Management System philosophy of planning, preparedness, readiness assurance, and response into EM training programs; Help EM training managers meet EM training requirements and conditions established by current regulations and policies; Supplement other TRADE EMI SIG documents and complement individual facility training documents. This program is designed for emergency management personnel who are responsible for providing or overseeing EM training but who do not necessarily possess expertise in developing training. It provides good practices from the manager`s point of view on how to produce, administer, and document facility EM training programs in the spirit of the DOE EM system philosophy. Basic guidance is also included for personnel who design, develop, deliver, and/or evaluate EM training programs or parts. This guidance includes key points of EM training programs and identifies other documents that contain useful and/or more detailed training information.« less
Strategic Mobility 21 Project Management Plan
2006-09-29
California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non
ERIC Educational Resources Information Center
Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.
This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for vehicle and mobile equipment mechanics I and II. Presented first are a…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... White-Nose Syndrome in Bats; Draft National Plan; Extension of Public Comment Period AGENCY: Fish and... plan to assist States, Federal agencies, and Tribes in managing white-nose syndrome (WNS) in bats. See... available online at http:[sol][sol]www.fws.gov/WhiteNoseSyndrome/. The document is also available from the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minana, Molly A.; Sturtevant, Judith E.; Heaphy, Robert
2005-01-01
The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in DOE/AL Quality Criteria (QC-1) as conformance to customer requirements and expectations. This quality plan defines the ASC program software quality practices and provides mappings of these practices to the SNL Corporate Process Requirements (CPR 1.3.2 and CPR 1.3.6) and the Department of Energy (DOE) document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines (GP&G). This quality plan identifies ASC management andmore » software project teams' responsibilities for cost-effective software engineering quality practices. The SNL ASC Software Quality Plan establishes the signatories commitment to improving software products by applying cost-effective software engineering quality practices. This document explains the project teams opportunities for tailoring and implementing the practices; enumerates the practices that compose the development of SNL ASC's software products; and includes a sample assessment checklist that was developed based upon the practices in this document.« less
[Requirements for the successful installation of an data management system].
Benson, M; Junger, A; Quinzio, L; Hempelmann, G
2002-08-01
Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-05-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-02-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Emergency management training program: Guide to good practice
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-07-01
The Emergency Management Training Program Guide to Good Practice is a project of the Training Resources and Data Exchange (TRADE) Emergency Management Issues Special Interest Group (EMI SIG). EMI SIG members expressed interest in a resource to assist in development of a comprehensive emergency management training program. This publication provides guidelines, methods, and materials for EMI SIG members to use, assisting in complete and effective emergency management programs. The purposes of the Emergency Management Training Program Guide to Good Practice are: Provide guidance in the development and management of Emergency Management (EM) training programs; Assist EM trainers to incorporate componentsmore » of the DOE Emergency Management System philosophy of planning, preparedness, readiness assurance, and response into EM training programs; Help EM training managers meet EM training requirements and conditions established by current regulations and policies; Supplement other TRADE EMI SIG documents and complement individual facility training documents. This program is designed for emergency management personnel who are responsible for providing or overseeing EM training but who do not necessarily possess expertise in developing training. It provides good practices from the manager's point of view on how to produce, administer, and document facility EM training programs in the spirit of the DOE EM system philosophy. Basic guidance is also included for personnel who design, develop, deliver, and/or evaluate EM training programs or parts. This guidance includes key points of EM training programs and identifies other documents that contain useful and/or more detailed training information.« less
Space Station Systems Technology Study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1984-01-01
The four study areas addressed are: (1) attitude control, (2) data management, (3) long-life thermal management, and (4) automated housekeeping integration. The design concepts in each area were refined. The cost benefits, schedules, and life cycle costs for the options were evaluated. Technology advancement plans were prepared for each of the selected items, and documentation was prepared.
Donald G. MacGregor; David N. Seesholtz
2008-01-01
Prior to the existence of the National Environmental Policy Act (NEPA), Forest Service district rangers had considerable latitude to make resource management decisions and execute management plans with relatively little encumbrance by documentation and process requirements. Today there appear to be differences not only in the district ranger population, but in the...
DOT National Transportation Integrated Search
1997-09-30
This document has been prepared to describe how the U.S. Department of Transportations (US DOT) Five- Year Strategic Plan for Professional Capacity Building for ITS Transportation Management and Traveler Information Services is being implemented, ...
Revisit, revamp and revitalize your business plan: Part 4.
Waldron, David
2011-01-01
A best practice for all imaging leaders working on a management development program should be to invest enough time to complete a detailed planthatsetsgoals, objectives, step targets, landmarks, and a timetable for their achievements. Keys to success for a management development program include no surprises, active participation, and preparation by both the facilitator and the managers involved. A successful management team will have trained staff and lean processes mapped and documented, as well as be comfortable in a coaching, delegating, and consensus management style.
76 FR 35433 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... Oil and Gas Management Plan, Implementation, KY and TN, Comment Period Ends: 08/15/ 2011, Contact: Dan... available on the Internet at: http://www.udot.utah.gov/bangerter600west/documents.html . Revision to FR...
Space Shuttle wind tunnel testing program
NASA Technical Reports Server (NTRS)
Whitnah, A. M.; Hillje, E. R.
1984-01-01
A major phase of the Space Shuttle Vehicle (SSV) Development Program was the acquisition of data through the space shuttle wind tunnel testing program. It became obvious that the large number of configuration/environment combinations would necessitate an extremely large wind tunnel testing program. To make the most efficient use of available test facilities and to assist the prime contractor for orbiter design and space shuttle vehicle integration, a unique management plan was devised for the design and development phase. The space shuttle program is reviewed together with the evolutional development of the shuttle configuration. The wind tunnel testing rationale and the associated test program management plan and its overall results is reviewed. Information is given for the various facilities and models used within this program. A unique posttest documentation procedure and a summary of the types of test per disciplines, per facility, and per model are presented with detailed listing of the posttest documentation.
,; ,; ,; ,; ,
2011-01-01
The impetus for developing this document is through implementing the Rocky Reach Pacific Lamprey Management Plan (PLMP), a component of the Rocky Reach Comprehensive Settlement Agreement, both of which are discussed more thoroughly in Section 1.2. The ultimate goal of the PLMP is to achieve No Net Impact (NNI) to Pacific lamprey of ongoing operations of the Rocky Reach Hydroelectric Project. Conducting artificial propagation of Pacific lamprey was considered by the state and federal fishery agencies and Tribes that are parties to the Settlement Agreement as a potential Protection, Mitigation, and Enhancement measure (PME) for achieving NNI during the term of the current Rocky Reach license. This document is intended to provide guidance as to the feas ibility of culturing Pacific lamprey, the associated facilities necessary for culture practices, and identifying uncertainties for monitoring culture efficacy and rationale for implementing Pacific lamprey artificial propagation
Oak Ridge National Laboratory Health and Safety Long-Range Plan: Fiscal years 1989--1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-06-01
The health and safety of its personnel is the first concern of ORNL and its management. The ORNL Health and Safety Program has the responsibility for ensuring the health and safety of all individuals assigned to ORNL activities. This document outlines the principal aspects of the ORNL Health and Safety Long-Range Plan and provides a framework for management use in the future development of the health and safety program. Each section of this document is dedicated to one of the health and safety functions (i.e., health physics, industrial hygiene, occupational medicine, industrial safety, nuclear criticality safety, nuclear facility safety, transportationmore » safety, fire protection, and emergency preparedness). Each section includes functional mission and objectives, program requirements and status, a summary of program needs, and program data and funding summary. Highlights of FY 1988 are included.« less
[Ethical principles of management and planning during influenza pandemic].
Kubar', O I; Asatrian, A Zh
2012-01-01
The article is dedicated to an actual problem of ethical component inclusion into the system of management and planning of epidemic control measures during threat emergence and in the course of influenza pandemic (epidemic) progress. Data regarding development of international ethical guidelines during influenza including WHO recommendations are presented and analysis of normative documents in Russian Federation is given. A necessity of comprehension and accounting of ethical values in pandemic preparedness is shown, main directions of action and responsibility are revealed. Key ethical positions of planning and implementation of measures during influenza pandemic are outlined, compliance with those determines the level of public support and thus provides the effectiveness of the implemented measures.
To tell the truth: disclosing the incentives and limits of managed care.
Morreim, E H
1997-01-01
As managed care becomes more prevalent in the United States, concerns have arisen over the business practices of managed care companies. A particular concern is whether patients should be made aware of the financial incentives and treatment limits of their healthcare plan. At present, managed care organizations are not legally required to make such disclosures. However, such disclosures would be advisable for reasons of ethical fidelity, contractual clarity, and practical prudence. Physicians themselves may also have a fiduciary responsibility to discuss incentives and limits with their patients. Once the decision to disclose has been made, the managed care organization must draft a document that explains, clearly and honestly, limits of care in the plan and physician incentives that might restrict the care a patient receives.
A case management tool for occupational health nurses: development, testing, and application.
Mannon, J A; Conrad, K M; Blue, C L; Muran, S
1994-08-01
1. Case management is a process of coordinating an individual client's health care services to achieve optimal, quality care delivered in a cost effective manner. The case manager establishes a provider network, recommends treatment plans that assure quality and efficacy while controlling costs, monitors outcomes, and maintains a strong communication link among all the parties. 2. Through development of audit tools such as the one presented in this article, occupational health nurses can document case management activities and provide employers with measurable outcomes. 3. The Case Management Activity Checklist was tested using data from 61 firefighters' musculoskeletal injury cases. 4. The activities on the checklist are a step by step process: case identification/case disposition; assessment; return to work plan; resource identification; collaborative communication; and evaluation.
GCS plan for software aspects of certification
NASA Technical Reports Server (NTRS)
Shagnea, Anita M.; Lowman, Douglas S.; Withers, B. Edward
1990-01-01
As part of the Guidance and Control Software (GCS) research project being sponsored by NASA to evaluate the failure processes of software, standard industry software development procedures are being employed. To ensure that these procedures are authentic, the guidelines outlined in the Radio Technical Commission for Aeronautics (RTCA/DO-178A document entitled, software considerations in airborne systems and equipment certification, were adopted. A major aspect of these guidelines is proper documentation. As such, this report, the plan for software aspects of certification, was produced in accordance with DO-178A. An overview is given of the GCS research project, including the goals of the project, project organization, and project schedules. It also specifies the plans for all aspects of the project which relate to the certification of the GCS implementations developed under a NASA contract. These plans include decisions made regarding the software specification, accuracy requirements, configuration management, implementation development and verification, and the development of the GCS simulator.
Kuperman, Gilad J; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D; Cooper, Mary
2006-01-01
At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality.
Kuperman, Gilad J.; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D.; Cooper, Mary
2006-01-01
At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality. PMID:17238381
14 CFR 77.75 - Establishment of antenna farm areas.
Code of Federal Regulations, 2011 CFR
2011-01-01
... indicated on an FAA planning document or military service military airport planning document. Planned or...; any other FAA planning document, or military service military airport planning document. Public use... layout plan, a military service approved military airport layout plan, or by any planning document...
Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Brandt, C M
1999-12-01
The second in a series of three articles devoted to the development, maintenance, and implementation of the National Association of School Nurses 1998-2001 Strategic Plan and how it relates to the practice of school nurses. Information about the development of a mission/vision statement for the organization is given along with strategies for developing a local school district school health program strategic plan. A previous Nursing Practice Management section article discussed the development of the Association's strategic plan considering the changing health care climate, the shifting needs of school children, and the economic climate for school funding. A future Nursing Practice Management section article will discuss the implementation of the seven goal areas in the National Association of School Nurses 1998-2001 Strategic Plan.
NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREEN,T.ET AL.
2003-12-31
Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetationmore » of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.« less
Head and neck multidisciplinary team meetings: Effect on patient management.
Brunner, Markus; Gore, Sinclair M; Read, Rebecca L; Alexander, Ashlin; Mehta, Ankur; Elliot, Michael; Milross, Chris; Boyer, Michael; Clark, Jonathan R
2015-07-01
The purpose of this study was for us to present our findings on the prospectively audited impact of head and neck multidisciplinary team meetings on patient management. We collected clinical data, the pre-multidisciplinary team meeting treatment plan, the post-multidisciplinary team meeting treatment plans, and follow-up data from all patients discussed at a weekly multidisciplinary team meeting and we recorded the changes in management. One hundred seventy-two patients were discussed in 39 meetings. In 52 patients (30%), changes in management were documented of which 20 (67%) were major. Changes were statistically more likely when the referring physician was a medical or radiation oncologist, when the initial treatment plan did not include surgery, and when the histology was neither mucosal squamous cell cancer nor a skin malignancy. Compliance to the multidisciplinary team meeting treatment recommendation was 84% for all patients and 70% for patients with changes in their treatment recommendation. Head and neck multidisciplinary team meetings changed management in almost a third of the cases. © 2014 Wiley Periodicals, Inc.
Comprehensive planning of data archive in Japanese planetary missions
NASA Astrophysics Data System (ADS)
Yamamoto, Yukio; Shinohara, Iku; Hoshino, Hirokazu; Tateno, Naoki; Hareyama, Makoto; Okada, Naoki; Ebisawa, Ken
Comprehensive planning of data archive in Japanese planetary missions Japan Aerospace Exploration Agency (JAXA) provides HAYABUSA and KAGUYA data as planetary data archives. These data archives, however, were prepared independently. Therefore the inconsistency of data format has occurred, and the knowledge of data archiving activity is not inherited. Recently, the discussion of comprehensive planning of data archive has started to prepare up-coming planetary missions, which indicates the comprehensive plan of data archive is required in several steps. The framework of the comprehensive plan is divided into four items: Preparation, Evaluation, Preservation, and Service. 1. PREPARATION FRAMEWORK Data is classified into several types: raw data, level-0, 1, 2 processing data, ancillary data, and etc. The task of mission data preparation is responsible for instrument teams, but preparations beside mission data and support of data management are essential to make unified conventions and formats over instruments in a mission, and over missions. 2. EVALUATION FRAMEWORK There are two meanings of evaluation: format and quality. The format evaluation is often discussed in the preparation framework. The data quality evaluation which is often called quality assurance (QA) or quality control (QC) must be performed by third party apart from preparation teams. An instrument team has the initiative for the preparation itself, and the third-party group is organized to evaluate the instrument team's activity. 3. PRESERVATION FRAMEWORK The main topic of this framework is document management, archiving structure, and simple access method. The mission produces many documents in the process of the development. Instrument de-velopment is no exception. During long-term development of a mission, many documents are obsoleted and updated repeatedly. A smart system will help instrument team to reduce some troubles of document management and archiving task. JAXA attempts to follow PDS manners to do this management since PDS has highly sophisticated archiving structure. In addition, the access method to archived data must be simple and standard well over a decade. 4. SERVICE FRAMEWORK The service framework including planetary data access protocol, PDAP, has been developed to share a stored data effectively. The sophisticated service framework will work not only for publication data, but also for low-level data. JAXA's data query services is under developed based on PDAP, which means that the low-level data can be published in the same manner as level 2 data. In this presentation, we report the detail structure of these four frameworks adopting upcoming Planet-C, Venus Climate Orbiter, mission.
FOIAonline allows the public to electronically submit/modify a FOIA request, check its status, search previously submitted requests, view responsive documents that are cleared for release, and file an appeal.
VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN
This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-28
... included climate change, sea level rise, refuge marshes, habitat and wildlife species management, mosquito... adulticides for mosquito control when there is a documented human disease threat, instead of only when a...
Effects of a towaway reporting threshold on crash analysis results
DOT National Transportation Integrated Search
1994-11-01
This guidebook is designed to be a hands-on, planner-friendly document that answers hard questions about intermodal management system planning in practice. The guidebook is written from the perspective of the Commonwealth of Massachusetts' developmen...
Special population planner 4 : an open source release.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuiper, J.; Metz, W.; Tanzman, E.
2008-01-01
Emergencies like Hurricane Katrina and the recent California wildfires underscore the critical need to meet the complex challenge of planning for individuals with special needs and for institutionalized special populations. People with special needs and special populations often have difficulty responding to emergencies or taking protective actions, and emergency responders may be unaware of their existence and situations during a crisis. Special Population Planner (SPP) is an ArcGIS-based emergency planning system released as an open source product. SPP provides for easy production of maps, reports, and analyses to develop and revise emergency response plans. It includes tools to manage amore » voluntary registry of data for people with special needs, integrated links to plans and documents, tools for response planning and analysis, preformatted reports and maps, and data on locations of special populations, facility and resource characteristics, and contacts. The system can be readily adapted for new settings without programming and is broadly applicable. Full documentation and a demonstration database are included in the release.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less
ERIC Educational Resources Information Center
Bennion, Paul
2013-01-01
This study focused on the perspectives of senior enrollment management administrators in relation to institutional strategic planning documents in order to gain insight into the extent to which "neoliberalism" is influencing the values and practices of private, nonprofit liberal arts institutions. The researcher focused on senior…
Coordination and Data Management of the International Arctic Buoy Programme (IABP)
2000-09-30
Coordination and Data Management of the International Arctic Buoy Programme ( IABP ) Ignatius G. Rigor 1013 NE 40th Street Polar Science Center...Coordination of the IABP falls into the categories of information, resource management, and meeting planning. Information is primarily distributed via a monthly...data and other research products of the IABP are available on the World Wide Web at http://iabp.apl.washington.edu/. Report Documentation Page Form
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less
CWA 15793 2011 Planning and Implementation Tool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gross, Alan; Nail, George
This software, built on an open source platform called Electron (runs on Chromium and Node.js), is designed to assist organizations in the implementation of a biorisk management system consistent with the requirements of the international, publicly available guidance document CEN Workshop Agreement 15793:2011 (CWA 15793). The software includes tools for conducting organizational gap analysis against CWA 15793 requirements, planning tools to support the implementation of CWA 15793 requirements, and performance monitoring support. The gap analysis questions are based on the text of CWA 15793, and its associated guidance document, CEN Workshop Agreement 16393:2012. The authors have secured permission from themore » publisher of CWA 15793, the European Committee for Standardization (CEN), to use language from the document in the software, with the understanding that the software will be made available freely, without charge.« less
Emergency Response Capability Baseline Needs Assessment Compliance Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sharry, John A.
2013-09-16
This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2013 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2009 BNA, the 2012 BNA document, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, firemore » department training records, and fire department policies and procedures.« less