Sample records for management plan project

  1. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  2. Project Management Plan

    SciTech Connect

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  3. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  4. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  5. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  6. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  7. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  8. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  9. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  10. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  11. Uranium Mill Tailings Remedial Action Project surface project management plan

    SciTech Connect

    Not Available

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials.

  12. Geothermal energy projects - Planning and management

    SciTech Connect

    Goodman, L.J.; Love, R.N.

    1980-01-01

    A presentation is made of management requirements for the development of geothermal resources by citing three major, and successful, projects: the Wairakei geothermal power project of New Zealand, the Hawaii geothermal project of the United States, and the Tiwi geothermal project of the Philippines. The three case studies are presented according to a format in which the history of each project falls into four phases: (1) planning, appraisal and design (2) section, approval and activation (3) operation, control and handover and (4) evaluation and refinement. Each case study furnishes extensive performance and economic figures, along with consideration of such related issues as geothermal effluent chemical content, infrastructural requirements, and environmental impact.

  13. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  14. AVLIS Production Plant Project Management Plan

    SciTech Connect

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  15. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  16. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  17. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  18. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  19. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  20. Breckinridge Project, initial effort. Report VI. Project Management Plan

    SciTech Connect

    1982-01-01

    Report VI presents a comprehensive plan for the management of the Breckinridge Project. For the purpose of this report, the project work is divided into five major project phases: Development, Engineering, Procurement, Construction, and Operations. The results of the Development Phase (Initial Effort) of the project are discussed in Section 1.0. This phase of the project was performed under a Cooperative Agreement with US Department of Energy and has produced 43 volumes of documentation. Fifteen volumes contain information of proprietary nature for patented processes and are therefore classified as Limited Access; however, twenty-eight volumes are not classified and are suitable for public dissemination. This Project Management Plan is a volume of the unclassified documentation. The other twenty-seven volumes contain comprehensive data on technical, financial, and environmental aspects of the project. Each of the four remaining project phases is presented starting with the extensive planning that will be performed and continuing through to the execution and completion of each phase. The major roles of the Operator, Ashland Synthetic Fuels, Inc. (ASFI), and the Managing Contractor are defined. Although a contract has not yet been executed with a Managing Contractor, the procedures, controls, organization and management philosophy of Bechtel Petroleum, Inc., are presented in this report as being representative of those used by contractors in the business of performing the engineering, procurement, and construction of projects of this size and complexity. The organizational structures of the Operator and the Managing Contractor are described, with designation of key project team personnel by job description and organization charts. Provisions for cost, schedule, and material control are described.

  1. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  3. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  4. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  5. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  6. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  7. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  8. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  10. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  12. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  13. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... this announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans... water conservation best management practices that shall ``develop criteria for evaluating the ] adequacy of all water conservation plans developed by project contractors, including those plans required...

  14. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  15. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  16. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  17. Spent nuclear fuel project high-level information management plan

    SciTech Connect

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  18. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... Water Conservation Plans. The above entities have developed a Plan, which Reclamation has evaluated and... on Central Valley Project water conservation best management practices that shall ``* * * develop criteria for ] evaluating the adequacy of all water conservation plans developed by project...

  19. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... the same as Water Conservation Plans. The above entities ] have developed a Plan, which Reclamation... Project water conservation best management practices that shall `` * * * develop criteria for evaluating the adequacy of all water conservation plans developed by project contractors, including those...

  20. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    ERIC Educational Resources Information Center

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  1. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  2. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  3. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  4. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  5. 7 CFR 275.18 - Project area/management unit corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit...

  6. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  7. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  8. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  9. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of...

  10. Fluid management plan for the Project Shoal Area Offsites Subproject

    SciTech Connect

    1996-08-01

    The US Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Offsites Subproject to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). A primary Subproject objective is to gather adequate data to characterize the various Subproject sites through the collection of surface and subsurface soil samples and by drilling several wells for the collection of groundwater data. The Project Shoal Area (PSA) is one of the Subproject`s Nevada sites and is subject to the requirements set forth in the Federal Facility Compliance Agreement and Consent Order (FFACO) (DOE, 1996a). In accordance with the FFACO, a Corrective Action Investigation Plan (CAIP) has been developed for work at the PSA (designated as Corrective Action Unit Number 416). This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from wells constructed at the PSA. Long-term monitoring and future activities at the site, if required, will be set forth in additional documents as required by the FFACO. The ultimate method for disposition of fluids generated by site operations depends upon sample analysis and process knowledge in relation to fluid management criteria. Section 2 describes well site operations; Section 3 discusses fluid management criteria; Section 4 includes the fluid monitoring program; Section 5 presents the fluid management strategy; Section 6 provides for fluid management during routine well monitoring; and Section 7 contains reporting criteria.

  11. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    PubMed

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  12. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans. The above... the Interior to establish and administer an office on Central Valley Project water conservation best... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau...

  13. Solid waste information and tracking system server conversion project management plan

    SciTech Connect

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  14. PUREX/UO{sub 3} deactivation project management plan

    SciTech Connect

    Washenfelder, D.J.

    1993-12-01

    From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO{sub 3}) Plant, which converted the PUREX liquid uranium nitrate product to solid UO{sub 3} powder. Final UO{sub 3} Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO{sub 3} Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO{sub 3} Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings.

  15. Solid Waste Information and Tracking System Client Server Conversion Project Management Plan

    SciTech Connect

    GLASSCOCK, J.A.

    2000-02-10

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  16. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  17. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    SciTech Connect

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  18. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    SciTech Connect

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  19. EMAP information management strategic plan: 1993-1997. Project report

    SciTech Connect

    Shepanek, R.F.

    1994-03-01

    The Information Management Strategic Plan for the Environmental Monitoring and Assessment Program (EMAP) describes how EMAP information will be managed from field sampling through the delivery of products to the user. This plan cuts across the entire EMAP program and explains the process for developing an information management infrastructure which will enable EMAP to achieve its long-term objectives. The Plan provides a strategy for meeting hardware, software, documentation support, and system designs that will meet EMAP Resource and Coordinating Group requirements. Users of EMAP data and information are discussed in the Plan as well as the process and technology with which they can access EMAP data and other data sources.

  20. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... level and flow upward to the State. (e) Planning processes developed with assistance under this section... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects....

  1. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  2. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  3. FRG sealed isotopic heat sources project (C-229) project management plan

    SciTech Connect

    Metcalf, I.L.

    1997-05-16

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC).

  4. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314

    SciTech Connect

    MCGREW, D.L.

    2000-04-19

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

  5. Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314

    SciTech Connect

    MCGREW, D.L.

    2000-04-19

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

  6. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... announcement, Water Management Plans (Plans) are considered the same as Water Conservation Plans. The above... establish and administer an office on Central Valley Project water conservation best management practices that shall ``develop criteria for evaluating the adequacy of all water conservation plans developed...

  7. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  8. Uranium mill tailings remedial action project real estate management plan

    SciTech Connect

    Not Available

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  9. Planning and managing future space facility projects. [management by objectives and group dynamics

    NASA Technical Reports Server (NTRS)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  10. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    .... James Irrigation District. Tranquility Irrigation District. Kaweah Delta Water Conservation District. To... considered the same as Water Conservation Plans. The above entities have each developed a Plan, which... Central Valley Project water conservation best management practices that shall ``develop criteria...

  11. Spent nuclear fuel project systems engineering management plan

    SciTech Connect

    Womack, J.C., Westinghouse Hanford

    1996-07-19

    The purpose of this document is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices. The methodology promotes and ensures sound management of the SNF Project. The scope of the document encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project including risk management process, design authority/design agent concept, and documentation responsibilities. This implementation applies to, and is tailored to the needs of the SNF Project and all its Subprojects, including all current and future Subprojects.

  12. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...) are considered the same as Water Conservation Plans. The above entities have each developed a Plan... an office on Central Valley Project water conservation best management practices that shall ``develop criteria for evaluating the adequacy of all water conservation plans developed by project...

  13. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Water Conservation Plans. The above entities have each developed a Plan, which Reclamation has evaluated... conservation best management practices that shall ``develop criteria for evaluating the adequacy of all water... Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau...

  14. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    .../District managers, biologists, water conservation specialists, engineers, the CALFED Bay-Delta Program, and... Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water... ``Criteria for Developing Refuge Water Management Plans'' (Refuge Criteria) are now available for...

  15. Automated Procurement System (APS) revised project management plan (DS-03)

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  16. Using Open Plan with integrated Xbase applications for effective project management solutions

    SciTech Connect

    Freier, K.D.; Hirschi, E.J.

    1994-04-01

    Open Plan`s open architecture allows the user many advantages that are not available from other project management software. One of these advantages is its ability to interface with various database management systems, thereby allowing the user to develop a project management system tailored to their specific needs. This open architecture offers maximum flexability to the user to personalize reports, screens, data structures, and develop customized management systems. Using Xbase, applications can be developed for every facet of a complete project management system including baseline development, performance measurement, reporting, and analysis. These applications can range from simple routines such as user-defined status worksheets, milestone logs and other reports, to complex cost,and schedule control systems. The combined power of Xbase and Open Plan can be used to produce effective project management solutions. Customized applications are easily obtainable allowing the user to gather information more timely and efficiently, produce customized reports, and analyze project management information more effectively.

  17. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  18. Project plan, Hazardous Materials Management and Emergency Response Training Center: Project 95L-EWT-100

    SciTech Connect

    Borgeson, M.E.

    1994-11-09

    The Hazardous Materials Management and Emergency Response (HAMMER) Training Center will provide for classroom lectures and hands-on practical training in realistic situations for workers and emergency responders who are tasked with handling and cleanup of toxic substances. The primary objective of the HAMMER project is to provide hands-on training and classroom facilities for hazardous material workers and emergency responders. This project will also contribute towards complying with the planning and training provisions of recent legislation. In March 1989 Title 29 Code of Federal Regulations Occupational Safety and Health Administration 1910 Rules and National Fire Protection Association Standard 472 defined professional requirements for responders to hazardous materials incidents. Two general types of training are addressed for hazardous materials: training for hazardous waste site workers and managers, and training for emergency response organizations.

  19. Project management for complex ground-based instruments: MEGARA plan

    NASA Astrophysics Data System (ADS)

    García-Vargas, María. Luisa; Pérez-Calpena, Ana; Gil de Paz, Armando; Gallego, Jesús; Carrasco, Esperanza; Cedazo, Raquel; Iglesias, Jorge

    2014-08-01

    The project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from different administrative departments at the funding centers worldwide distributed. The complexity of the organizations, the technological and scientific return to the Consortium partners and the participation in the project of all kind of professional centers working in astronomical instrumentation: universities, research centers, small and large private companies, workshops and providers, etc. make the project management strategy, and the tools and procedures tuned to the project needs, crucial for success. MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi-Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain). MEGARA is being developed under contract with GRANTECAN.

  20. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY... Refuge Water Management Plans (Refuge Criteria). Several entities have each developed a Refuge Water... requirements of these Refuge Criteria (see list in Supplementary Information below). Willow Creek Mutual...

  1. 76 FR 18213 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... Energy Regulatory Commission Idaho Power; Notice of Availability of Land Management Plan Update for the... inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2778-062. c. Date Filed... a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to...

  2. 76 FR 18214 - Idaho Power; Notice of Availability of Land Management Plan Update for the Shoshone Falls Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... Energy Regulatory Commission Idaho Power; Notice of Availability of Land Management Plan Update for the... inspection: a. Application Type: Land Management Plan Update. b. Project No.: 2055-087. c. Date Filed... a Land Management Plan (LMP) update for the project. The LMP is a comprehensive plan to...

  3. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    SciTech Connect

    Wecks, M.D.

    1998-04-15

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented.

  4. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    SciTech Connect

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  5. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    SciTech Connect

    Childs, Allen

    2002-03-01

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.

  6. Project Management Plan 105-KE Basin sludge retrieval and packaging

    SciTech Connect

    McWethy, L.M.

    1994-11-07

    The KE Basin contains over 1,100 metric tons of spent nuclear fuel (SNF). The bulk of this inventory consists of over 50,000 zircaloy clad, uranium metal N-Reactor fuel element assemblies, along with less than half a metric ton of single-pass reactor fuel elements, stored in over 3,600 open top canister assemblies. In addition, sludge containing fissile and fission product material from damaged/degraded fuel has accumulated in the basin. The sludge, particularly the fines, impacts basin operations by clouding the water and making activities requiring a clear view impossible to complete until after sludge settles. Packaging would get the sludge out of the operator`s way and allow it to be moved within the basin in a more manageable state. The primary project objective is to develop, procure, and quality the equipment needed to remove all sludge from the KE Basin with minimal dose commitment, minimal cost, and on schedule. The project will provide: (1) the development, testing, and installation of equipment for sludge retrieval and packaging; (2) understanding of and experience with actual sludge through near-term sludge packaging feature tests in the KE Basin; (3) sludge removal and handling equipment required to support debris removal, fuel handling, and other activities involving sludge within the KE Basin; and (4) enlist industry expertise in all phases of the project. This Project Management Plant establishes the organizational responsibilities, control systems, and procedures for the execution of project activities for KE Basin sludge retrieval packaging, to meet programmatic requirements within authorized funding and approved schedules.

  7. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  8. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  9. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    SciTech Connect

    Childs, Allen B.

    2002-03-01

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is

  10. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  11. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2009-04-03

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

  12. Project management plan, double-shell tank system specification development

    SciTech Connect

    Conrads, T.J.

    1998-01-26

    The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Energy (DOE) to support removal of wastes from the Hanford Site 200 Area tanks in two phases. The schedule for these phases allows focusing on requirements for the first phase of providing feed to the privatized vitrification plants. The Tank Waste Retrieval Division near-term goal is to focus on the activities to support Phase 1. These include developing an integrated (technical, schedule, and cost) baseline and, with regard to private contractors, establishing interface agreements, constructing infrastructure systems, retrieving and delivering waste feed, and accepting immobilized waste products for interim onsite storage. This document describes the process for developing an approach to designing a system for retrieving waste from double-shell tanks. It includes a schedule and cost account for the work breakdown structure task.

  13. Planning in context: A situated view of children's management of science projects

    NASA Astrophysics Data System (ADS)

    Marshall, Susan Katharine

    This study investigated children's collaborative planning of a complex, long-term software design project. Using sociocultural methods, it examined over time the development of design teams' planning negotiations and tools to document the coconstruction of cultural frameworks to organize teams' shared understanding of what and how to plan. Results indicated that student teams developed frameworks to address a set of common planning functions that included design planning, project metaplanning (things such as division of labor or sharing of computer resources) and team collaboration management planning. There were also some between-team variations in planning frameworks, within a bandwidth of options. Teams engaged in opportunistic planning, which reflected shifts in strategies in response to new circumstances over time. Team members with past design project experience ("oldtimers") demonstrated the transfer of their planning framework to the current design task, and they supported the developing participation of "newcomers." Teams constructed physical tools (e.g. planning boards) that acted as visual representations of teams' planning frameworks, and inscriptions of team thinking. The assigned functions of the tools also shifted over time with changing project circumstances. The discussion reexamines current approaches to the study of planning and discusses their educational implications.

  14. Project Management Plan for the Hawaii Geothermal Project Environmental Impact Statement

    SciTech Connect

    Reed, R.M.; Saulsbury, J.W.

    1993-06-01

    In 1990, Congress appropriated $5 million (Pu 101-514) for the State of Hawaii to use in Phase 3 of the Hawaii Geothermal Project (HGP). As defined by the State in its 1990 proposal to Congress, the HGP would consist of four phases: (1) exploration and testing of the geothermal resource associated with the Kilauea Volcano on the Island of Hawaii (the Big Island), (2) demonstration of deep-water power transmission cable technology in the Alenuihaha Channel between the Big Island and Maui, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands (DBED 1990). Because it considered Phase 3 to be research and not project development or construction, Congress indicated that allocation of this funding would not be considered a major federal action under NEPA and would not require an EIS. However, because the project is highly visible, somewhat controversial, and involves a particularly sensitive environment in Hawaii, Congress directed in 1991 (House Resolution 1281) that ''...the Secretary of Energy shall use such sums as are necessary from amounts previously provided to the State of Hawaii for geothermal resource verification and characterization to conduct the necessary environmental assessments and/or environmental impact statement (EIS) for the geothermal initiative to proceed''. In addition, the U.S. District Court of Hawaii (Civil No. 90-00407, June 25, 1991) ruled that the federal government must prepare an EIS for Phases 3 and 4 before any further disbursement of funds was made to the State for the HGP. This Project Management Plan (PMP) briefly summarizes the background information on the HGP and describes the project management structure, work breakdown structure, baseline budget and schedule, and reporting procedures

  15. WICHE Management Information Systems Program. Higher Education Facilities Planning and Management Manuals Project. (SAM-Space Analysis Manuals Project) Project Description.

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, Boulder, CO.

    This report describes the basic objectives, assumptions, orientation and development of the Space Analysis Manuals Project. The main objective is to write and distribute a series of annuals describing methods and procedures for use by college and university personnel in planning and managing college and university facilities. One of the basic…

  16. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    SciTech Connect

    Burgard, K.G.

    1998-09-24

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

  17. Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)

    SciTech Connect

    IT Corporation, Las Vegas

    2002-04-24

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations.

  18. Lee Hot Springs power project. First topical report management plan

    SciTech Connect

    1996-03-18

    The Lee Hot Springs Project ({open_quotes}the Project{close_quotes}) will use binary cycle turbine-generators supplied by geothermal hot water to make electricity. Two clusters of three (3) 1,000 kilowatt ({open_quotes}kw{close_quotes}) projects, each cluster comprising a {open_quotes}plant,{close_quotes} will use the pumped output of one geothermal well. The plants will tie into Sierra Pacific Power Company`s ({open_quotes}Sierra`s{open_quotes}) transmission system. The Project objectives are designed to demonstrate that geothermal energy is a non-polluting, non-CO{sub 2} emitting form of generation, which if used in larger increments, will significantly reduce the emissions of greenhouse gasses. The Project will also demonstrate the use of modular, {open_quotes}non-grid{close_quotes} or {open_quotes}village{close_quotes} units which can be used throughout the world where geothermal energy is present in remote locations and power is not. The Project was conceived as a 20,000 kw Qualifying Facility, divided into two phases, a 5,000 kw phase one followed by a 15,000 kw phase two. The first phase of the Project now consists of two (2) 3,000 kw plants to generate 6,000 kws.

  19. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  20. 340 waste handling complex: Deactivation project management plan

    SciTech Connect

    Stordeur, R.T.

    1998-06-25

    This document provides an overview of the strategy for deactivating the 340 Waste Handling Complex within Hanford`s 300 Area. The plan covers the period from the pending September 30, 1998 cessation of voluntary radioactive liquid waste (RLW) transfers to the 340 Complex, until such time that those portions of the 340 Complex that remain active beyond September 30, 1998, specifically, the Retention Process Sewer (RPS), can also be shut down and deactivated. Specific activities are detailed and divided into two phases. Phase 1 ends in 2001 after the core RLW systems have been deactivated. Phase 2 covers the subsequent interim surveillance of deactivated and stand-by components during the period of continued RPS operation, through the final transfer of the entire 340 Complex to the Environmental Restoration Contractor. One of several possible scenarios was postulated and developed as a budget and schedule planning case.

  1. DAF Glovebox Project Plan

    SciTech Connect

    Martinez, M.W.; Higgs, R.L.

    2000-11-14

    This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

  2. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    SciTech Connect

    Berger, Matthew T.; Judd, Steven L.

    1999-01-01

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  3. Solid waste information and tracking system client-server conversion project management plan

    SciTech Connect

    May, D.L.

    1998-04-15

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion. It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  4. Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    SciTech Connect

    Fix, N. J.

    2008-02-20

    The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

  5. Sound waste management plan. Restoration project 95115. Exxon Valdez oil spill restoration project final report

    SciTech Connect

    1996-02-01

    The project was designed to address marine pollution that is generated from landbased sources within the Prince William Sound communities of Cordova, Valdez, Whittier Tatitlek, and Chenega Bay. The project recommends ways to improve the management of three different waste streams generated within the communities and which are a chronic source of marine pollution: used oil, household hazardous waste, and solid waste. The recommendations, some of which have already been implemented, include: creation of a comprehensive used oil management system in each community, construction of Environmental Operation Stations to improve the overall management of solid and oily wastes, and the development of a regional household hazardous waste program.

  6. Mixed waste management plans at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Walsh, T.J.; Sattler, J.M.

    1996-07-01

    The Fernald Environmental Management Project (FEMP) is a United States Department of Energy (DOE) facility located in southwestern Ohio. The facility began production of uranium metal products in the early 1950`s and continued processing of uranium ore concentrates until 1989. The facility used a variety of chemical and metallurgical processes to manufacture uranium metals for use at other DOE sites across the country. Because of the chemical and metallurgical processes employed at the site, some hazardous wastes as defined by the Resource Conservation and Recovery Act (RCRA) were generated during the manufacture of the uranium metal products. Because of uranium metal`s radioactive properties, the hazardous wastes generated at the facility typically contain some radioactivity. Wastes which contain both a hazardous component subject to RCRA regulation and a radioactive component subject to the Atomic Energy Act of 1954 are described as mixed waste. In 1989, the FEMP was placed on the National Priorities List (NPL) requiring cleanup of the facility`s radioactive and chemical contamination under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This paper examines the regulatory requirements associated with development of the plan used to manage mixed wastes at the FEMP. In addition, the paper discusses the strategies used to integrate the requirements of the Federal Facility Compliance Act (FFCAct) with CERCLA response actions.

  7. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  8. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    SciTech Connect

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

  9. Project management skills.

    PubMed

    Perce, K H

    1998-08-01

    1. Project management skills are important to develop because occupational and environmental health nurses are increasingly asked to implement and manage health related projects and programs. 2. Project management is the process of planning and managing project tasks and resources, and communicating the progress and results. This requires the coordination of time, tasks, equipment, people, and budget. 3. Three main critical skill areas are needed to be an effective project manager: behavioral skills such as negotiation, conflict resolution, and interpersonal problem solving; use of project management tools to manage project tasks and resources; and effective communication skills. PMID:9748920

  10. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    SciTech Connect

    Not Available

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  11. Rainwater Wildlife Area Management Plan Executive Summary : A Columbia Basin Wildlife Mitigation Project.

    SciTech Connect

    Childs, Allen B.

    2002-02-01

    This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projects (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public

  12. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    SciTech Connect

    SHOOP, D.S.

    1999-09-10

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment.

  13. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  14. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    SciTech Connect

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

  15. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Management Plans are considered the same as Water Conservation Plans. DATES: Submit written comments by April... water conservation best management practices (BMPs) that shall develop Criteria for evaluating the... Bureau of Reclamation Central Valley Project Improvement Act, Standard Criteria for Ag and Urban...

  16. 75 FR 19966 - Boulder Canyon Project-Post-2017 Application of the Energy Planning and Management Program Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... Western Area Power Administration Boulder Canyon Project--Post-2017 Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area Power Administration, DOE. ACTION: Notice... comment period regarding the application of the Energy Planning and Management Program (Program)...

  17. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    SciTech Connect

    DOE /NV

    2000-04-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

  18. Global Threat Reduction Initiative Fuel Thermo-Physical Characterization Project: Sample Management Plan

    SciTech Connect

    Casella, Amanda J.; Pereira, Mario M.; Steen, Franciska H.

    2013-01-01

    This sample management plan provides guidelines for sectioning, preparation, acceptance criteria, analytical path, and end-of-life disposal for the fuel element segments utilized in the Global Threat Reduction Initiative (GTRI), Fuel Thermo-Physical Characterization Project. The Fuel Thermo-Physical Characterization Project is tasked with analysis of irradiated Low Enriched Uranium (LEU) Molybdenum (U-Mo) fuel element samples to support the GTRI conversion program. Sample analysis may include optical microscopy (OM), scanning electron microscopy (SEM) fuel-surface interface analysis, gas pycnometry (density) measurements, laser flash analysis (LFA), differential scanning calorimetry (DSC), thermogravimetry and differential thermal analysis with mass spectroscopy (TG /DTA-MS), Inductively Coupled Plasma Spectrophotometry (ICP), alpha spectroscopy, and Thermal Ionization Mass Spectroscopy (TIMS). The project will utilize existing Radiochemical Processing Laboratory (RPL) operating, technical, and administrative procedures for sample receipt, processing, and analyses. Test instructions (TIs), which are documents used to provide specific details regarding the implementation of an existing RPL approved technical or operational procedure, will also be used to communicate to staff project specific parameters requested by the Principal Investigator (PI). TIs will be developed, reviewed, and issued in accordance with the latest revision of the RPL-PLN-700, RPL Operations Plan. Additionally, the PI must approve all project test instructions and red-line changes to test instructions.

  19. Developing integrated parametric planning models for budgeting and managing complex projects

    NASA Technical Reports Server (NTRS)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  20. Project management plan, Hazardous Materials Management and Emergency Response Training Center

    SciTech Connect

    Borgeson, M.E.

    1994-12-12

    For the next 30 years, the main activities at the Hanford Site will involve the handling and cleanup of toxic substances. Thousands of workers involved in these new activities will need systematic training appropriate to their tasks and associated risks. This project is an important part of the Hanford Site mission and will enable the US Department of Energy (DOE) to meet high standards for safety. The Hazardous Materials Management and Emergency Response Training Center (HAMMER) project will construct a centralized regional training center dedicated to training hazardous materials workers and emergency responders in classrooms and with hands-on, realistic training aids representing actual field conditions. The HAMMER Training Center will provide a cost-effective, high-quality way to meet the Hanford Site training needs. The training center creates a partnership among DOE; government contractors; labor; local, state, and tribal governments; and selected institutions of higher education.

  1. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    SciTech Connect

    Findlay, Rick

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  2. Developing and applying uncertain global climate change projections for regional water management planning

    NASA Astrophysics Data System (ADS)

    Groves, David G.; Yates, David; Tebaldi, Claudia

    2008-12-01

    Climate change may impact water resources management conditions in difficult-to-predict ways. A key challenge for water managers is how to incorporate highly uncertain information about potential climate change from global models into local- and regional-scale water management models and tools to support local planning. This paper presents a new method for developing large ensembles of local daily weather that reflect a wide range of plausible future climate change scenarios while preserving many statistical properties of local historical weather patterns. This method is demonstrated by evaluating the possible impact of climate change on the Inland Empire Utilities Agency service area in southern California. The analysis shows that climate change could impact the region, increasing outdoor water demand by up to 10% by 2040, decreasing local water supply by up to 40% by 2040, and decreasing sustainable groundwater yields by up to 15% by 2040. The range of plausible climate projections suggests the need for the region to augment its long-range water management plans to reduce its vulnerability to climate change.

  3. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    SciTech Connect

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  4. LABCORE post release 1.0 development system project management plan

    SciTech Connect

    Rich, H.S.

    1994-09-29

    The LABCORE post release 1.0 development system project management plan (SPMP) is the primary planning document governing the development of specific enhancements to the LABCORE project. The mission of the Westinghouse Hanford Company (WHC) laboratories is changing from supporting the 200 Area chemical processing plants for process control, waste management, and effluent monitoring to supporting environmental restoration and regulatory compliance commitments. The LABCORE program was implemented as the key element for meeting the commitments by upgrading the laboratories through the implementation of an Automated Data Processing improvement program in January 1994. Scope for LABCORE release 1.0 consisted of hardware and software implementation required to support a minimum number of analyses (Single-Shell Tank [SST] analysis at 222S Laboratory and Performance Evaluation samples at the Waste Sampling Characterization Facility laboratory) using manual entry of data, and to support routine laboratory functions, common to all laboratories. LABCORE post release 1.0 enhancements will expand the functionality presented to the laboratory. Post release 1.0 enhancements will also address the integration of a database for Analytical Services Program Integration, budgeting, and scheduling offices into LABCORE.

  5. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    SciTech Connect

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  6. Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

  7. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  8. HANDI 2000 project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-09-09

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00, Rev. 11, by integrating the major Hanford business processes and their supporting information systems.

  9. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    SciTech Connect

    Jacobsen, P.H.

    1997-09-23

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  10. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  11. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  12. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    SciTech Connect

    Busack, Craig A.; Watson, Bruce; Johnston, Mark

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  13. Waste Management Plan for the Lower East Fork Poplar Creek Remedial Action Project Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Landfill V, and restore the affected floodplain upon completion of remediation activities. This effort will be conducted in accordance with the Record of Decision (ROD) for LEFPC as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) action. The Waste Management Plan addresses management and disposition of all wastes generated during the remedial action for the LEFPC Project Most of the solid wastes will be considered to be sanitary or construction/demolition wastes and will be disposed of at existing Y-12 facilities for those types of waste. Some small amounts of hazardous waste are anticipated, and the possibility of low- level or mixed waste exists (greater than 35 pCi/g), although these are not expected. Liquid wastes will be generated which will be sanitary in nature and which will be capable of being disposed 0214 of at the Oak Ridge Sewage Treatment Plant.

  14. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    SciTech Connect

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  15. Mid-term evaluation of USAID (US Agency for International Development) Sudan Energy Planning and Management Project (650-0059)

    SciTech Connect

    Jones, D.W.; Stovall, J.P.; Raby, J.G.; Younger, D.R.; Pryor, C.A.

    1988-06-01

    In 1984, the United States Agency for International Development's mission in Sudan implemented the Energy Planning and Management Project to strengthen several key institutions in the energy sector of Sudan. One component of the project focused on improving management, billing and collection, pricing, purchasing and stores, and vehicle operation and maintenance in the National Electricity Corporation. The other major component was devoted to strengthening the capability of the National Energy Administration to conduct national energy planning studies, including the analysis of energy issues and policies and the recommendation of policies. Originally the planned date for the midterm evaluation of this project was early 1986, but because political turmoil and other events impeded implementation of the project, that evaluation was only conducted in January and February 1987. ORNL, at the request of the Sudan Mission and the office of Energy of AID, fielded a team in January 1987 to evaluate the progress of the project to that date and make recommendations for the remainder of the project's implementation. This study reports the findings and recommendations of the evaluation team regarding the Sudan Energy Management and Planning Project. 84 refs., 2 figs., 6 tabs.

  16. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    USGS Publications Warehouse

    Hanson, Randall T.; Lockwood, Brian; Schmid, Wolfgang

    2014-01-01

    The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations and assumptions of 2009 urban water demand and land use. Water supplied directly from precipitation, and indirectly from reuse, captured local runoff, and groundwater is necessary but inadequate to satisfy agricultural demand without coastal and regional storage depletion that facilitates seawater intrusion. These facilities reduce potential seawater intrusion by about 45% with groundwater levels in the four regions served by the CDS projected to recover to levels a few feet above sea level. The projected recoveries are not high enough to prevent additional seawater intrusion during dry-year periods or in the deeper aquifers where pumpage is greater. While these facilities could reduce coastal pumpage by about 55% of the historical 2000–2009 pumpage for these regions, and some of the water is delivered in excess of demand, other coastal regions continue to create demands on coastal pumpage that will need to be replaced to reduce seawater intrusion. In addition, inland urban and agricultural demands continue to sustain water levels below sea level causing regional landward gradients that also drive seawater intrusion. Seawater intrusion is reduced by about 45% but it supplies about 55% of the recovery

  17. SNF Project Engineering Process Improvement Plan

    SciTech Connect

    DESAI, S.P.

    2000-02-09

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities.

  18. Management self assessment plan

    SciTech Connect

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  19. Successful Corporate ID Project Management.

    ERIC Educational Resources Information Center

    Liang, Chaoyun Chaucer; Schwen, Thomas M.

    1999-01-01

    Provides a literature review on project management related to corporate instructional design activities. Highlights include project integration, strategic planning, resource allocation, optimizing performance and quality, constructing a project team, generating a productive working climate, and implementation strategies. (LRW)

  20. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    NASA Astrophysics Data System (ADS)

    Hanson, R. T.; Lockwood, B.; Schmid, Wolfgang

    2014-11-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori. The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations

  1. Project: MOBILITY: A Federally Funded Research and Design Project for Disadvantaged and Handicapped Vocational Education Students. Long Range Planning Process. Management Plans.

    ERIC Educational Resources Information Center

    Corrigan, Robert E.; Wood, R. Ronald

    A management plan developed for the district-wide coordination of vocational education program planning in the State Center Community College District, California, is presented. Following a discussion of the planning process (in memo form) and a section on how to read flow-block diagrams, the mission profile and narrative description of this model…

  2. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    SciTech Connect

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

  3. Developing an Effective Crisis Management Plan: The Role of a Project Manager.

    ERIC Educational Resources Information Center

    Orifici, J. Michael

    2000-01-01

    After fire and smoke damaged an upstate New York school's cafeteria, kitchen, and administrative offices, the district superintendent contacted a professional construction-management firm to begin restoration and reopen the school within days. Safety and sensitivity to building occupants' needs were paramount. (MLH)

  4. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  5. Project Execution Plan, Rev. 3

    SciTech Connect

    IT Corporation, Las Vegas

    2002-08-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls.

  6. Risk Management Plan

    SciTech Connect

    G. R. Stephenson

    2001-12-01

    The purpose of this Risk Management Plan (RMP) is to establish the concept and define the process to assure that National Nuclear Security Administration Nevada Operations Office Environmental Management (NNSA/NV EM) programs and projects incorporate appropriate, efficient, cost-effective measures to mitigate the impact of program-and/or project-related risks. In addition, it describes the roles and responsibilities of program personnel in performing the risk management functions, and defines reporting and tracking requirements for risk-related information. The product of this risk analysis will be a risk analysis report listing the various risks with their classification, mitigation and handling strategies, impact on cost and schedule, and action items. The risk management process will identify potential risk sources; assess individual risks and impacts on performance, cost, and schedule; evaluate alternative approaches to mitigate high and moderate risks; develop action plans to handle individual risks; and interface risks with other programs and/or projects. Risk management and risk assessment will be consistent with DOE Orders 430.1 and 413.3 and their associated guidance documentation. The RMP will remain valid for the life cycle of the program and/or projects and will be under configuration control with revisions to be conducted as required and approved.

  7. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    SciTech Connect

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  8. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    SciTech Connect

    Adamson, M. G.

    1997-10-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted.

  9. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  10. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  11. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  12. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  13. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  14. Project resources planning and control

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1984-01-01

    This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

  15. Quality Assurance Project Plan

    SciTech Connect

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  16. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9

    SciTech Connect

    GREEN, J.W.

    2000-05-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.

  17. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  18. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    NASA Technical Reports Server (NTRS)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  19. Planning Complex Projects Automatically

    NASA Technical Reports Server (NTRS)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  20. Project management controls

    SciTech Connect

    Hardin, D.S.; Carnes, W.S.

    1990-12-31

    Project management controls are utilized to enhance the probability that a project will be successful. The control system used by a project manager can take many forms and can be applied at different times to varying degrees on a given project depending upon its complexity. The Consolidated Incineration Facility (CIF) is one project of many at the Savannah River Site (SRS). The United States Department of Energy Order 4700.1 is a project management system that is applied on a site-wide basis, thus including the CIF. The control system required by this order is proceduralized to ensure that it is applied in a consistent manner and will produce reliable results. These results provide the project manager with a correlation of both costs and schedule within the defined scope to adequately asses the status of the project. This is an iterative process and can be simply stated: plan, actual, variance, corrective action, prediction, and revision. This paper presents the basis for the project management controls applied at the Savannah River Site.

  1. Project management controls

    SciTech Connect

    Hardin, D.S. ); Carnes, W.S. )

    1990-01-01

    Project management controls are utilized to enhance the probability that a project will be successful. The control system used by a project manager can take many forms and can be applied at different times to varying degrees on a given project depending upon its complexity. The Consolidated Incineration Facility (CIF) is one project of many at the Savannah River Site (SRS). The United States Department of Energy Order 4700.1 is a project management system that is applied on a site-wide basis, thus including the CIF. The control system required by this order is proceduralized to ensure that it is applied in a consistent manner and will produce reliable results. These results provide the project manager with a correlation of both costs and schedule within the defined scope to adequately asses the status of the project. This is an iterative process and can be simply stated: plan, actual, variance, corrective action, prediction, and revision. This paper presents the basis for the project management controls applied at the Savannah River Site.

  2. Yakima/Klickitat Production Project Preliminary Design Report, Appendix A: Refined Project Goals and Harvest Managment Plan : Experimental Design Plan : Genetic Risk Assessment.

    SciTech Connect

    Yakima Indian Nation; Pacific Northwest Laboratory; Washington Department of Fisheries

    1990-03-01

    The purpose of the project as stated by the Northwest Power Planning Council is 'to test the assumption that new artificial production in the Yakima and Klickitat subbasins can be used to increase harvest and enhance natural production while maintaining genetic resources.'

  3. Energy Management Plan.

    ERIC Educational Resources Information Center

    Tasmania Dept. of Education, Hobart (Australia). Facilities Services Section.

    This report presents an overview of the energy management plan for Tasmanian schools designed to minimize the costs of all forms of energy usage within these facilities. The policy and objectives of the plan are provided along with details of the plan itself and its current status. Appendices contain an extract from Asset Management Plan for Real…

  4. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  5. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  6. Planning for Project Continuation.

    ERIC Educational Resources Information Center

    Berry, Grant, Jr.

    Designed to help colleges plan for the successful continuation of educational improvement projects beyond the end of their original funding period, this report presents a case study of Pennsylvania College of Technology's (PCT's) efforts to ensure the continuation of a Title III faculty development program. After describing the the Title III…

  7. Energy planning and management plan

    SciTech Connect

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

  8. A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process

    NASA Technical Reports Server (NTRS)

    Vairo, Daniel M.

    1998-01-01

    The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.

  9. Integrated Project Management System description. [UMTRAP Project

    SciTech Connect

    Not Available

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office ( Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs.

  10. Pend Oreille Wetlands Wildlife Mitigation Project Management Plan for the "Dilling Addition".

    SciTech Connect

    Entz, Ray D.

    1999-01-15

    This report is a recommendation from the Kalispel Tribe to the Bonneville Power Administration (BPA) and the Columbia Basin Fish and Wildlife Authority (CBFWA) for management of the Pend Oreille Wetland Wildlife Mitigation project II (Dilling Addition) for the extensive habitat losses caused by Albeni Falls Dam on Kalispel Ceded Lands. Albeni Falls Dam is located on the Pend Oreille River near the Washington-Idaho border, about 25 miles upstream of the Kalispel Indian Reservation. The dam controls the water level on Lake Pend Oreille. The lake was formerly the center of subsistence use by the Kalispel Tribe. Flooding of wetlands, and water fluctuations both on the lake and downstream on the river, has had adverse impacts to wildlife and wildlife habitat. An extensive process was followed to formulate and prioritize wildlife resource goals. The Kalispel Natural Resource Department provided guidance in terms of opportunities onsite. To prioritize specific goals, the Albeni Falls Interagency Work Group and the Columbia Basin Fish and Wildlife Authority Wildlife Caucus were consulted. From this process, the top priority goal for the Kalispel Tribe is: Protect and develop riparian forest and shrub, and freshwater wetlands, to mitigate losses resulting from reservoir inundation and river level fluctuations due to Albeni Falls Dam. Indicator species used to determine the initial construction/inundation loses and mitigation project gains include Bald Eagle (breeding and wintering), Black-capped Chickadee, Canada Goose, Mallard, muskrat, white-tailed deer, and Yellow Warbler.

  11. Planning a Multimedia Documentation Project.

    ERIC Educational Resources Information Center

    Rockley, Ann

    1994-01-01

    Outlines the process of planning and developing a multimedia documentation project. Discusses audience, task, and information analysis; selection of the most appropriate media; effective design; establishment of the development team; hardware and software requirements; costs; and project planning. (SR)

  12. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  13. Tank waste remediation system configuration management plan

    SciTech Connect

    Vann, J.M.

    1998-01-08

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

  14. Yucca Mountain Site Characterization Project Plan

    SciTech Connect

    Gertz, C.P.; Bartlett, J.

    1992-01-01

    The purpose of this document is to describe the Yucca Mountain Site Characterization Project (YMP) and establish an approved YMP baseline against which overall YMP progress and management effectiveness shall be measured. For the sake of brevity, this document will be referred to as the Project Plan throughout this document. This Project Plan only addresses activities up to the submittal of the repository license application (LA) to the Nuclear Regulatory Commission (NRC). A new Project Plan will be submitted to establish the technical, cost, and schedule baselines for the final design and construction phase of development extending through the start of repository operations, assuming that the site is determined to be suitable.

  15. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  16. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  17. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    NASA Technical Reports Server (NTRS)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  18. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    SciTech Connect

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  19. Demil planning and management system

    SciTech Connect

    Huber, C.C.; Bormet, S.M.; Whitfield, R.G.; Bowen, M.; Chun, K.C.; Golden, R.E.; Fuller, R.

    1997-08-01

    The National Maintenance Point (NMP) Branch of the US Army Industrial Operations Command (IOC) serves as the Single Manager for Conventional Ammunition (SMCA) agent for managing the renovation, modification, recycling, and disposal of conventional ammunition, thereby improving readiness. The mission of the NMP includes program management for demilitarization (demil) activities, ammunition maintenance, and ammunition peculiar equipment (APE) projects. Through an Interagency Agreement between the US Army and the US Department of Energy, Argonne National Laboratory (ANL) is developing an integrated data management system, called the Demil Planning and Management System (DPMS), for IOC. DPMS is intended to help NMP efficiently manage information on ongoing demil project activities and asset inventories, plan future projects, and allocate budgets. This system, when fully implemented, will also make it possible for the user community to interactively access the DPMS database; perform data entry and queries; and run reports through network, modem, and Internet access to the system. This paper describes the principal components of the DPMS, current capabilities, and planned enhancements.

  20. Creating project plans to focus product development.

    PubMed

    Wheelwright, S C; Clark, K B

    1992-01-01

    The long-term competitiveness of most manufacturers depends on their product development capabilities. Yet few companies approach the development process systematically or strategically. They end up with an unruly collection of projects that do not match long-term business objectives and that consume far more development resources than are available. Instead of working on important projects, development engineers spend their time fighting fires. Their productivity sinks, and products are invariably late to market. To attack development malaise and reinvigorate the process, companies should put together an "aggregate project plan." The plan helps managers restructure the development process so they no longer think in terms of individual projects but in terms of the "set" of projects. It is the set, not individual projects, that shapes the creation of a successful product line. The aggregate project plan also helps managers allocate resources, sequence projects, and build critical development capabilities. A central element of the aggregate project plan is the project map. The map categorizes projects into five types: breakthrough, platform, derivative, research and development, and partnerships. Each project type has its own unique characteristics and requires a different amount of development time. Companies should have projects in all categories to ensure a robust development process. PMID:10117370

  1. Risk Management for Enterprise Resource Planning System Implementations in Project-Based Firms

    ERIC Educational Resources Information Center

    Zeng, Yajun

    2010-01-01

    Enterprise Resource Planning (ERP) systems have been regarded as one of the most important information technology developments in the past decades. While ERP systems provide the potential to bring substantial benefits, their implementations are characterized with large capital outlay, long duration, and high risks of failure including…

  2. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  3. Overview of the Hanford risk management plan

    SciTech Connect

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  4. Conforth Ranch (Wanaket) Wildlife Mitigation Project : Draft Management Plan and Draft Environmental Assessment.

    SciTech Connect

    United States. Bonneville Power Administration; Confederated Tribes of the Umatilla Reservation, Oregon.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI).

  5. GSC configuration management plan

    NASA Technical Reports Server (NTRS)

    Withers, B. Edward

    1990-01-01

    The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.

  6. Advanced Life Support Project Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  7. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  8. Coping with urban growth and development through environmental planning and management (EPM): the sustainable Dar es Salaam project.

    PubMed

    Majani, B B

    1996-03-01

    This article discusses the Urban Management Program (UMP) in Dar es Salaam, Tanzania. The UMP is a joint effort of UNCHS (Habitat), UNDP, and the World Bank. The UMP established the Sustainable Cities Program (SCP) in August 1990. The aim was to provide city officials and their partners in private, public, and popular sectors with improved environmental planning and management capacity. Dar es Salaam has 4 major land formations that constrain management options. About 70% of urban population live in unplanned areas with marginal access to piped water, sanitation, drainage, or basic social services. Improper waste disposal has contributed to water pollution. Under 3% of the city's solid waste is collected. Low lying areas along the coast become flooded, and poor drainage causes continually flooded road systems. SCP began a 4-stage process to identify issues, develop and implement strategy and action plans, and institutionalize the process. An environmental profile was established in 1992. Plans were developed for solid waste management, upgrading unplanned settlements, servicing planned land and city center renewal, and managing open spaces, wastes, and petty trading. These efforts were institutionalized. The efforts are noteworthy for their active participation in plan preparation by key urban managers, multisectoral coordination on environmental issues, involvement of the private sector, establishment of priorities, and detailed action plans. Political support at the highest levels combined with community participation were key to program success. The lessons learned are identified.

  9. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  10. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  11. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  12. Project Management; Part 1--The Soft Skills.

    ERIC Educational Resources Information Center

    Bailey, Harold J.; Ergott, Kathleen A.

    1998-01-01

    Presents the first of a three-part series of articles on the life of a project manager. Discussion in Part 1 deals with the people and related skills involved in the project, including: interrelationships between the client, project manager, and executive management; oral, written, and body-language communication forms; and planning and…

  13. Neste plans three projects

    SciTech Connect

    Not Available

    1993-02-03

    Neste Chemicals (Helsinki) is discussing three joint ventures with local authorities in China, says Mikko Haapavaara, v.p./Asia. The projects should help the Finnish producer to increase sales in Asia by a considerable amount by 2000, he says. The plan involves production of polyethylene (PE), unsaturated polyester resins and PE compounding-all core operations. Sites have not been selected, but Shanghai is the favored location for the PE operations. The company is also looking at a site in the south, near Hong Kong, and at locations near Beijing. The PE plant would need to be near an ethylene unit, says Haapavaara. The PE resin plant would be designed to produce about 150,000 m.t./year and would cost about No. 150 million. A part of the output would need to be exported to take care of the financing, the company says. A feasibility study now under way with the potential Chinese partners should be completed by the end of March. The plant would use Neste's linear low-density PE process, proved in a world-scale plant at Beringen, Belgium. The compounding units would produce specialty PE material for the wire and cable and pipe industry. The company is a joint venture partner in a propane dehydrogenation/polypropylene (PP) plant and a minority partner in a Qualipoly, the 20,000 m.t./year unsaturated polyester resin producer.

  14. Project Specific Quality Assurance Plan

    SciTech Connect

    Pedersen, K.S.

    1995-09-27

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291.

  15. Project Execution Plan

    SciTech Connect

    DOE /NV

    1999-03-22

    Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of organizations from both the public and private

  16. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    SciTech Connect

    Not Available

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  17. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  18. Plutonium Vulnerability Management Plan

    SciTech Connect

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  19. Design and implementation of a CO{sub 2} flood utilizing advanced reservoir characterization and horizontal injection wells in a shallow shelf carbonate approaching waterflood depletion: Project management/evaluation plan

    SciTech Connect

    Hallenbeck, L.D.; Harpole, K.J.; Gerard, M.G.

    1995-05-03

    The objectives of the Management/Evaluation Plan are: (1) clarify management structure, task responsibilities and schedules, and (2) to be used as a basis for judging the Project Evaluation Report submitted as a part of the continuation application. The components addressed in the report are: management structure; project staff organization; management procedure; quality assurance plan; ES and H plan and environmental compliance reporting; task WBS and logic flow diagram; list and schedule of planned deliverables; diagram of existing facilities; industry interaction; and evaluation of technical and economic feasibility.

  20. PLANNING QUALITY IN GEOSPATIAL PROJECTS

    EPA Science Inventory

    This presentation will briefly review some legal drivers and present a structure for the writing of geospatial Quality Assurance Projects Plans. In addition, the Geospatial Quality Council geospatial information life-cycle and sources of error flowchart will be reviewed.

  1. Project W-320 ALARA Plan

    SciTech Connect

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  2. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  3. PRE-QUALITY ASSURANCE PROJECT PLAN (QAPP) AGREEMENT (PQA) (HANDOUT)

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  4. National Ignition Facility project acquisition plan revision 1

    SciTech Connect

    Clobes, A.R.

    1996-10-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager.

  5. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  6. National Security Technology Incubation Project Continuation Plan

    SciTech Connect

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  7. Medical waste management plan.

    SciTech Connect

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  8. Biohazardous waste management plan.

    SciTech Connect

    Lane, Todd W.

    2004-01-01

    This plan describes the process for managing non-medical biohazardous waste at Sandia National Laboratories California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of biohazardous waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to non-medical biohazardous waste.

  9. Hungry Horse Dam Wildlife Habitat Enhancement Project: Long-Term Habitat Management Plan, Elk and Mule Deer Winter Range Enhancement, Firefighter Mountain and Spotted Bear Winter Ranges.

    SciTech Connect

    Casey, Daniel; Malta, Patrick

    1990-06-01

    Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area. Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.

  10. National Ignition Facility Configuration Management Plan

    SciTech Connect

    Cabral, S G; Moore, T L

    2002-10-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  11. Strategic Planning and Financial Management

    ERIC Educational Resources Information Center

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  12. FLEXI Project Management Survey

    NASA Astrophysics Data System (ADS)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  13. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  14. Single Shell Tank (SST) Interim Stabilization Project Plan

    SciTech Connect

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  15. Tips for Project Management.

    ERIC Educational Resources Information Center

    Thornley, James

    1996-01-01

    Presents ideas regarding instructional design project management for performance technologists that are likely to increase client satisfaction. Topics include a project kickoff summary; maintaining communication, including submitting reports, talking to the client, addressing problems quickly, and follow-up; and closing the project effectively.…

  16. Project implementation plan: ASTD remote deployment

    SciTech Connect

    CRASS, D.W.

    1999-08-18

    This Project Implementation Plan (PIP) shall be the controlling document for the Accelerated Site Technology Deployment (ASTD) supported project to procure and qualify a remote/robotic work platform for large hot cell deactivation in the 324 Building B-Cell. This plan will be integrated into the 324/327 Buildings Stabilization/Deactivation Project, Project Management Plan, (HNF-IP-1289, Rev. 1) and shall comply with the base requirements established in that document. This PIP establishes the baseline and defines the scope, schedule, budget, organizational responsibilities, reporting requirements, deliverables, and end points for the implementation of new technology into B-Cell. This shall include procurement, safety, quality assurance, training, documentation, record management, and facility modifications applicable to this project. Specifically this plan controls and executes the procurement and acceptance, qualification, and turnover of a remote/robotic work platform for 324 Building B-Cell. This includes the development of functional parameters, performance requirements, evaluation criteria, procurement specifications, acceptance and qualification test procedures, training requirements, and turnover responsibilities. The 324/237 Buildings Stabilization/Deactivation Project is currently in its second year of a nine-year project to complete deactivation and closure of the facility for long-term surveillance and maintenance. A major obstacles for the project is the inability to effectively perform deactivation tasks within high radioactively contaminated hot cells. The current strategies utilize inefficient and resource intensive technologies that significantly impact the cost and schedule for stabilization and deactivation. The ASTD Remote Deployment Project shall identify, procure, and turnover, to the B-Cell project, a remote/robot work platform to improve B-Cell cleanup productivity and enhance worker safety and health.

  17. Draft of the PHENIX Management Plan

    SciTech Connect

    Not Available

    1994-03-10

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants.

  18. PFP Interface identification and management planning guide

    SciTech Connect

    SINCLAIR, J.C.

    1999-05-20

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required.

  19. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  20. Shippingport Station Decommissioning Project decommissioning plan. Volume XII

    SciTech Connect

    Not Available

    1983-01-01

    Information is presented concerning allowable residual contamination levels in soil for decommissioning the Shippingport reactor site; draft statement of work for the decommissioning operations contractor; the Shippingport Station Decommissioning Project Change Control Board charter; the surplus facilities management program; the Shippingport Station Decommissioning Project charter; DOE-RL/DOE-PNR program management agreement; and draft occupational medical plan for the decommissioning project.

  1. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  2. A reservoir management plan

    SciTech Connect

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  3. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  4. Fluid Management Plan for the Project Shoal Area, Off-sites Subproject, CAU 447, Revision 0 (with Record of Technical Change No. 1, 2, and 3)

    SciTech Connect

    USDOE /NV

    1999-04-01

    The U.S. Department of Energy, Nevada Operations Office (DOE/NV) has initiated the Off-Site Project to characterize the hazards posed to human health and the environment as a result of underground nuclear testing activities at facilities other than the Nevada Test Site (NTS). The Project Shoal Area (PSA) is one of the Off-Sites Project areas located off the NTS, but within the state of Nevada. The PSA is located approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. Four wells were drilled at the PSA in 1996 as part of the site investigation administered through the Federal Facility Agreement and Consent Order (FFACO) (1996). The hydrogeologic data gathered from these wells was used to support the groundwater flow and contaminant transport modeling of the PSA. However, the subsequent evaluation of the groundwater model concluded that further delineation of the subsurface was required to reduce uncertainties in the model. In accordance with the FFACO, an addendum to the Corrective Action Investigation Plan (CAIP) for the proposed PSA subsurface investigation, Corrective Action Unit 447, was developed. The addendum proposed the drilling and construction of four additional wells and the conduct of hydrologic testing at the PSA. This Fluid Management Plan (FMP) provides guidance for the management of fluids generated from the well construction and testing activities at the PSA.

  5. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    SciTech Connect

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  6. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  7. Solid waste management complex site development plan

    SciTech Connect

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  8. Best management practices plan for the Lower East Fork Poplar Creek remedial action project, Oak Ridge, Tennessee

    SciTech Connect

    1996-08-01

    The U.S. Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee: the Oak Ridge Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL) managed by Lockheed Martin Environmental Research Corporation. All facilities are managed by Lockheed Martin Energy Systems, Incorporated (Energy Systems) for the DOE. The Y-12 Plant is adjacent to the city of Oak Ridge and is also upstream from Oak Ridge along East Fork Poplar Creek. The portion of the creek downstream from the Y-12 Plant is Lower East Fork Poplar Creek (LEFPC). This project will remove mercury-contaminated soils from the LEFPC floodplain, transport the soils to Industrial Landfill V (ILF-V), and restore any affected areas. This project contains areas that were designated in 1989 as a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site. The site includes DOE property and portions of commercial, residential, agricultural, and miscellaneous areas within the city of Oak Ridge.

  9. Catchment Area Treatment (CAT) Plan and Crop Area Optimization for Integrated Management in a Water Resource Project

    NASA Astrophysics Data System (ADS)

    Jaiswal, R. K.; Thomas, T.; Galkate, R. V.; Ghosh, N. C.; Singh, S.

    2013-09-01

    A scientifically developed catchment area treatment (CAT) plan and optimized pattern of crop areas may be the key for sustainable development of water resource, profitability in agriculture and improvement of overall economy in drought affected Bundelkhand region of Madhya Pradesh (India). In this study, an attempt has been made to develop a CAT plan using spatial variation of geology, geomorphology, soil, drainage, land use in geographical information system for selection of soil and water conservation measures and crop area optimization using linear programming for maximization of return considering water availability, area affinity, fertilizers, social and market constraints in Benisagar reservoir project of Chhatarpur district (M.P.). The scientifically developed CAT plan based on overlaying of spatial information consists of 58 mechanical measure (49 boulder bunds, 1 check dam, 7 cully plug and 1 percolation tank), 2.60 km2 land for agro forestry, 2.08 km2 land for afforestation in Benisagar dam and 67 mechanical measures (45 boulder bunds and 22 gully plugs), 7.79 km2 land for agro forestry, 5.24 km2 land for afforestation in Beniganj weir catchment with various agronomic measures for agriculture areas. The linear programming has been used for optimization of crop areas in Benisagar command for sustainable development considering various scenarios of water availability, efficiencies, affinity and fertilizers availability in the command. Considering present supply condition of water, fertilizers, area affinity and making command self sufficient in most of crops, the net benefit can be increase to Rs. 1.93 crores from 41.70 km2 irrigable area in Benisagar command by optimizing cropping pattern and reducing losses during conveyance and application of water.

  10. Tank waste remediation system privatization phase 1 infrastructure project W-519, project execution plan

    SciTech Connect

    Parazin, R.J.

    1998-08-28

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented.

  11. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-01-01

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.

  12. Management and Evaluation Plan for Instructional Systems Development for Vocational-Technical Education. Project ABLE: Development and Evaluation of an Experimental Curriculum for the New Quincy (Mass.) Vocational-Technical School.

    ERIC Educational Resources Information Center

    Ullery, J. William

    Intended to serve as a manual for the developmental and evaluative activities of Project ABLE, this report presents the management and evaluation plan for instructional system development. Major emphasis of the plan is the formation of evaluative procedures drawing on student performance data as the primary source of feedback. To insure continuous…

  13. National Ignition Facility Risk Management Plan

    SciTech Connect

    Brereton, S.J.

    1997-02-01

    The NIF Risk Management Plan has been prepared in accordance with the DOE Life Cycle Asset Management Good Practice Guide to support Critical Decision 3 of the NIF Project. The objectives of the plan are to: 1) identify the risks to the completion of the Project in terms of meeting technical and regulatory requirements, cost, and schedule, 2) assess the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H (environment, safety and health), costs, and schedule, and 3) address each identified risk in terms of suitable risk mitigation measures. The documents that form the basis for this risk assessment are as follows: 1. Final Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (DOE, 1996a) and Record of Decision (DOE, 1996b), 2. Preliminary Hazards Analysis (Brereton, 1993), 3. Fire Hazards Analysis (Jensen, 1997), 4. Preliminary Safety Analysis Report (LLNL, 1996a), 5. Reliability, Availability and Maintainability Report, 6. Radiation Protection Evaluation, 7. Primary Criteria and Functional Requirements (LLNL, 1996b), 8. Project Execution Plan (DOE, 1996c), 9. Schedule Risk Assessment, 10. Construction Safety Program (LLNL, 1997), 11. Title I Design Media, 12. Congressional Data Sheet. The process used in developing this plan was to form a Risk Assessment team of knowledgeable project personnel. This included: Assurances Manager, Systems Integration Manager, Project Control Manager, a Risk Management consultant, Deputy Associate Project Engineer for Activation and Start-up (Co-chairperson), and Lead Engineer for Safety Analysis (Co-chairperson). They were familiar with the risk basis documents and developed a list of the key risk elements. A methodology for assigning likelihoods, consequences, and risks was developed. Risk elements were then reviewed, and likelihoods, consequences, and risks were assigned. Risk mitigation measures were then developed. Comments were obtained

  14. QUEST2: Release 1: Project plan deliverable set

    SciTech Connect

    Braaten, F.D.

    1995-02-10

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19.

  15. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  16. Nutritional considerations in project planning.

    PubMed

    Mason, J; Garcia, M; Mitchell, J; Test, K; Henderson, C; Tabatabai, H

    1985-05-01

    procedures are seen to be important if they can be fully integrated with the overall project planning.

  17. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  18. The mixed waste management facility, FY95 plan

    SciTech Connect

    Streit, R.

    1994-12-01

    This document contains the Fiscal Year 1995 Plan for the Mixed Waste Management Facility (MWMF) at Lawrence Livermore National Laboratory. Major objectives to be completed during FY 1995 for the MWMF project are listed and described. This report also contains a budget plan, project task summaries, a milestone control log, and a responsibility assignment matrix for the MWMF project.

  19. Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: a case study using simulation modelling

    NASA Astrophysics Data System (ADS)

    Fryling, Meg

    2010-11-01

    Organisations often make implementation decisions with little consideration for the maintenance phase of an enterprise resource planning (ERP) system, resulting in significant recurring maintenance costs. Poor cost estimations are likely related to the lack of an appropriate framework for enterprise-wide pre-packaged software maintenance, which requires an ongoing relationship with the software vendor (Markus, M.L., Tanis, C., and Fenema, P.C., 2000. Multisite ERP implementation. CACM, 43 (4), 42-46). The end result is that critical project decisions are made with little empirical data, resulting in substantial long-term cost impacts. The product of this research is a formal dynamic simulation model that enables theory testing, scenario exploration and policy analysis. The simulation model ERPMAINT1 was developed by combining and extending existing frameworks in several research domains, and by incorporating quantitative and qualitative case study data. The ERPMAINT1 model evaluates tradeoffs between different ERP project management decisions and their impact on post-implementation total cost of ownership (TCO). Through model simulations a variety of dynamic insights were revealed that could assist ERP project managers. Major findings from the simulation show that upfront investments in mentoring and system exposure translate to long-term cost savings. The findings also indicate that in addition to customisations, add-ons have a significant impact on TCO.

  20. Department of Energy Project Management System

    SciTech Connect

    Not Available

    1981-01-08

    This manual provides guidance to all appropriate personnel for implementation of DOE Project Management Policy. It sets forth the principles and requirements that govern the development, approval, and execution of DOE's outlay programs as embodied within the Project Management System (PMS). Its primary goal is to assure application of sound management principles providing a disciplined, systematic, and coordinated approach resulting in efficient planning, organization, coordination, budgeting, management, review, and control of DOE projects. The provisions of this manual are mandatory for the Department's Major Systems Acquisitions (MSA's) and Major Projects and will be used for other projects to the extent practicable. Department's project-management task is over 250 projects, with a total estimated cost in excess of $24 billion at completion. This diverse array of project activities requires a broad spectrum of scientific, engineering, and management skills to assure that they meet planned technical and other objectives and are accomplished on schedule, within cost and scope, and that they serve the purposes intended. In recognition of these requirements and the Department's ever-increasing magnitude of responsibilities, an interim Project Management System was established and has been in use for over a year. This manual constitutes an update of the system based on the experience gained and lessons learned during this initial period.

  1. Project Management Methodology in Human Resource Management

    ERIC Educational Resources Information Center

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  2. Update on Service Management project

    SciTech Connect

    2011-02-28

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  3. Update on Service Management project

    ScienceCinema

    None

    2016-07-12

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS⁢ Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS⁢ Service Management Teams Reinoud Martens, Mats Moller

  4. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  5. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes. PMID:15682672

  6. Types of Managed Care Plans

    MedlinePlus

    ... AAP Find a Pediatrician Family Life Medical Home Health Insurance Pediatric Specialists Family Dynamics Media Work & Play Getting ... Your Community Healthy Children > Family Life > Medical Home > Health Insurance > Types of Managed Care Plans Family Life Listen ...

  7. Health professional's role in disaster planning: a strategic management approach.

    PubMed

    Meyer, M U; Graeter, C J

    1995-05-01

    1. The Strategic Management for Total Quality in Health Care model incorporates strategic management methods and total quality principles to enhance management of complex, interdisciplinary projects. 2. The purpose of disaster planning is to provide an effective and efficient plan to prevent personal injury and limit property damage and capital losses, as well as return to full production after a disaster. 3. Participation in disaster response planning provides health professionals with an opportunity to demonstrate the benefits they can provide for meeting their company's business needs. 4. Disaster planning is a complex, interdisciplinary project that requires a strategic management framework to facilitate development of high quality, cost effective programs.

  8. Environmental Restoration Program project management plan for the DOE Oak Ridge Field Office Major System Acquisition OR-1. Revision 1, Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-12-01

    In the early 1940s, the Manhattan Project was conducted in a regulatory and operational environment less sophisticated than today. Less was known of the measures needed to protect human health and safety and the environment from the dangers posed by radioactive and hazardous wastes, and experience in dealing with these hazardous materials has grown slowly. Certain hazards were recognized and dealt with from the beginning. However, the techniques used, though standard practices at the time, are now known to have been inadequate. Consequently, the DOE has committed to an aggressive program for cleaning up the environment and has initiated an Environmental Restoration Program involving all its field offices. The objective of this program is to ensure that inactive and surplus DOE facilities and sites meet current standards to protect human health and the environment. The objective of these activities is to ensure that risks posed to human health and safety and the environment by inactive sites and surplus facilities contaminated with radioactive, hazardous, and/or mixed wastes are either eliminated or reduced to prescribed safe levels. This Project Management Plan for Major System Acquisition OR-1 Project documents, communicates, and contributes to the evolution of, the management organizations, systems, and tools necessary to carry out effectively the long-range complex cleanup of the DOE sites on the Oak Ridge Reservation, and at the Paducah, Kentucky, and Piketon, Ohio, uranium enrichment plants managed by the Department of Energy Oak Ridge Field Office; the cleanup of off-site contamination resulting from past releases; and the Decontamination and Decommissioning of surplus DOE facilities at these installations.

  9. AVLIS production plant waste management plan

    SciTech Connect

    Not Available

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  10. NIF Project Management System Description

    SciTech Connect

    Wolfe, C.R.

    1997-08-01

    This document has been prepared for two purposes: 1. To demonstrate compliance with the project management requirements of DOE Order 430. 1, Life-Cycle Asset Management (LCAM). 2. To summarize in one place the approved Project documents which, taken as a whole, describe the NIF Project Management System.

  11. Site systems engineering: Systems engineering management plan

    SciTech Connect

    Grygiel, M.L.

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  12. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  13. Minerals Management Service: Strategic plan

    SciTech Connect

    1997-09-30

    This plan addresses the management of the mineral resources on the Outer Continental Shelf in an environmentally sound and safe manner and the timely collection, verification, and distribution of mineral revenues from Federal and Indian lands. The Minerals Management Service (MMS) manages the Nation`s natural gas, oil and other mineral resources on the Outer Continental Shelf (OCS), and collects, accounts for, and disburses revenues from offshore federal mineral leases and from onshore mineral leases on Federal and Indian lands.

  14. Business System Planning Project, Alternatives Analysis

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files.

  15. Underground storage tank management plan

    SciTech Connect

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  16. 76 FR 55939 - Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Bureau of Land Management Notice of Availability of the Draft Resource Management Plan and Associated Environmental Impact Statement for the Lander Resource Management Plan Revision Project, Lander Field Office...: You may submit comments related to the Lander Resource Management Plan Revision Project by any of...

  17. Fast flux test facility, transition project plan

    SciTech Connect

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  18. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... responsibility for housing project operations. Borrowers that plan to self-manage a housing project also must... requirements. (4) If a borrower enters into an agreement with a management agent or begins to self-manage prior... will require the borrower to immediately terminate the contract with the management agent. (f)...

  19. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... responsibility for housing project operations. Borrowers that plan to self-manage a housing project also must... requirements. (4) If a borrower enters into an agreement with a management agent or begins to self-manage prior... will require the borrower to immediately terminate the contract with the management agent. (f)...

  20. IAIMS at Columbia: a strategic plan and model project.

    PubMed

    Hendrickson, G L; Anderson, R K; Levy, R I

    1986-07-01

    This report describes the Integrated Academic Information Management System (IAIMS) prototype project at the Columbia-Presbyterian Medical Center, the factors that led to the selection of this particular project, and the planning for its implementation. The lessons learned to date and implications for the library are summarized.

  1. Study on project schedule management based on comprehensive comparison methods

    NASA Astrophysics Data System (ADS)

    Ge, Jun-ying

    2011-10-01

    Project schedule management is the central content in project organization plan, which affects the project time and investment. The traditional representation methods of schedule are gant chart, network chart, S curve, etc. With the engineering scale increasing constantly, techniques and management level are improving, single method can not meet the requirements of project schedule management. Comprehensive comparison method gets more and more attention, and has become one symbol of project management modernization with its vivacity and brevity form. The paper analyzes the factors that affect the project, and then compare the progress of the different control methods, finally it made some management measures of project schedule.

  2. Waste Management Quality Assurance Plan

    SciTech Connect

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  3. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    SciTech Connect

    Not Available

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  4. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  5. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  6. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  7. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... management planning. Before grant assistance can be awarded for any treatment works project, the Regional... under sections 303(e) and 305(b) of the Act....

  8. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Water quality management planning. 35... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2102 Water quality... Administrator shall first determine that the project is: (a) Included in any water quality management plan...

  9. Planning a change project in mental health nursing.

    PubMed

    Thorpe, Rebecca

    2015-09-01

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  10. Planning a change project in mental health nursing.

    PubMed

    Thorpe, Rebecca

    2015-09-01

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project. PMID:26329087

  11. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  12. 78 FR 54949 - Major Project Financial Plan Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... TRANSPORTATION Federal Highway Administration Major Project Financial Plan Guidance AGENCY: Federal Highway... Major Project Financial Plan Guidance outlining the procedures the FHWA will follow when reviewing and approving Financial Plans. The proposed Major Project Financial Plan Guidance incorporates changes...

  13. Stratosphere-troposphere exchange project management

    NASA Technical Reports Server (NTRS)

    Russell, Philip B.; Condon, Estelle; Pfister, Leonhard

    1990-01-01

    The purpose is to manage the Stratosphere Troposphere Exchange Project (STEP). This includes holding and planning science team meetings, organizing sessions at conferences devoted to the results and objectives of STEP field programs, putting together special journal issues or special sections of journal issues devoted to the results of STEP, and planning and producing technical memoranda on STEP. Summary of progress and results are given.

  14. UMTRA Project: Environment, Safety, and Health Plan

    SciTech Connect

    Not Available

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project`s ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors` evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations.

  15. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  16. Make safety programs work efficiently with an effective management plan

    SciTech Connect

    Lyle, D.

    1995-07-01

    Like budgets or any other major projects, safety works better when everyone in the company commits to manage the program effectively. Let someone overspend a budget or miss a projected revenue plan and a company moves quickly to correct the problem. However, there is a tendency to ignore a manager whose department has a poor safety record, as though it`s bad luck.

  17. Management Planning: Innovation on Campus.

    ERIC Educational Resources Information Center

    Hall, Stephen S. J.

    1973-01-01

    Management planning is a body of concepts and techniques designed to facilitate the analytical and forecasting processes within a department, to increase the decision-making prerogatives of the department director within predetermined guidelines, and to encourage and reinforce communication both among the departments and between the departments…

  18. MSFC Propulsion Systems Department Knowledge Management Project

    NASA Technical Reports Server (NTRS)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  19. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    SciTech Connect

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  20. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  1. Forest Resource Management Plans: A Sustainability Approach

    ERIC Educational Resources Information Center

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  2. Payload/orbiter contamination control requirement study: Preliminary contamination mission support plan. [a management analysis of project planning of spacecraft sterilization

    NASA Technical Reports Server (NTRS)

    Bareiss, L. E.; Hooper, V. W.; Ress, E. B.

    1976-01-01

    Progress is reported on the mission support plan and those support activities envisioned to be applicable and necessary during premission and postmission phases of the Spacelab program. The purpose, role, and requirements of the contamination control operations for the first two missions of the Spacelab equipped Space Transportation System are discussed. The organization of the contamination control operation and its relationship to and interfaces with other mission support functions is also discussed. Some specific areas of contamination to be investigated are treated. They are: (1) windows and viewports, (2) experiment equipment, (3) thermal control surfaces, (4) the contaminant induced atmosphere (as differentiated from the normal ambient atmosphere at the orbit altitude), and (5) optical navigation instruments.

  3. Performance Demonstration Program Management Plan

    SciTech Connect

    Carlsbad Field Office

    2005-07-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by

  4. Business System Planning Project System Requirements Specification

    SciTech Connect

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  5. Guidance and Control Software Project Data - Volume 1: Planning Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  6. Power Extension Package (PEP) system definition extension, orbital service module systems analysis study. Volume 10: PEP project plan

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.

  7. The Project Manager's Tool Kit

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2003-01-01

    Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

  8. Waste Management Quality Assurance Plan

    SciTech Connect

    Waste Management Group

    2006-08-14

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs.

  9. A strategic planning framework for endowment management.

    PubMed

    McLean, R A

    1990-01-01

    New techniques in portfolio management can be used to integrate the management of long-term investments into implementation of the strategic plan. This integration requires cash-flow planning, portfolio restructuring, and continuous monitoring.

  10. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  11. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  12. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  13. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  14. Tank waste remediation system configuration management implementation plan

    SciTech Connect

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.

  15. Life sciences space biology project planning

    NASA Technical Reports Server (NTRS)

    Primeaux, G.; Newkirk, K.; Miller, L.; Lewis, G.; Michaud, R.

    1988-01-01

    The Life Sciences Space Biology (LSSB) research will explore the effect of microgravity on humans, including the physiological, clinical, and sociological implications of space flight and the readaptations upon return to earth. Physiological anomalies from past U.S. space flights will be used in planning the LSSB project.The planning effort integrates science and engineering. Other goals of the LSSB project include the provision of macroscopic view of the earth's biosphere, and the development of spinoff technology for application on earth.

  16. Waste Management Process Improvement Project

    SciTech Connect

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-02-25

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle.

  17. Solid Waste Management Plan. Revision 4

    SciTech Connect

    1995-04-26

    The waste types discussed in this Solid Waste Management Plan are Municipal Solid Waste, Hazardous Waste, Low-Level Mixed Waste, Low-Level Radioactive Waste, and Transuranic Waste. The plan describes for each type of solid waste, the existing waste management facilities, the issues, and the assumptions used to develop the current management plan.

  18. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  19. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  20. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  1. 40 CFR 763.93 - Management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Management plans. 763.93 Section 763... ASBESTOS Asbestos-Containing Materials in Schools § 763.93 Management plans. (a)(1) On or before October 12, 1988, each local education agency shall develop an asbestos management plan for each school,...

  2. PRE-QAPP AGREEMENT (PQA) AND ANALYTICAL METHOD CHECKLISTS (AMCS): TOOLS FOR PLANNING RESEARCH PROJECTS

    EPA Science Inventory

    The Land Remediation and Pollution Control Division (LRPCD) QA Manager strives to assist LRPCD researchers in developing functional planning documents for their research projects. As part of the planning process, several pieces of information are needed, including information re...

  3. Deworming/family planning project launched on estate.

    PubMed

    Siva, V

    1979-01-01

    A deworming/family planning project funded by JOICFP was successfully initiated in Kerling Estate, Kuala Kubu Bahru, Malaysia. Rapport between estate management, workers, and the National Family Planning Board helped establish the project. A recent Gotong-Royong or community self-help project had encouraged enthusiasm among workers to clean up the estate. Mothers were exhorted to plan their families and devote attention to the health and welfare of the children. The need for parents to understand the causes of infestation and educate their children to wear slippers or shoes and develop good toilet habits was emphasized by Dr. Nor Laily Aziz. Continuing National Family Planning Board and Government support was pledged.

  4. PFP deactivation project management plan

    SciTech Connect

    Bogen, D.M.

    1997-07-28

    This document identifies the overall approach for deactivation of the Plutonium Finishing Plant (PFP) Complex, excluding the vaults, and includes a draft set of End Point Criteria for all buildings being deactivated.

  5. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  6. The New Project Design and Management Workshop Training Manual.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    This training manual presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first six sections contain the…

  7. Planning and Implementing Social Service Information Systems: A Guide for Management and Users. Human Services Monograph Series Number 25. Project Share.

    ERIC Educational Resources Information Center

    Cotter, Barbara

    Intended to aid administrators and users of social services in establishing information systems, this comprehensive guide to the design of such systems identifies the elements, effective strategies, and potential pitfalls involved in their planning, implementation, and utilization. Detailed discussions of management strategies for system…

  8. Integrated monitoring plan for the Hanford groundwater monitoring project

    SciTech Connect

    Hartman, M.J.; Dresel, P.E.; McDonald, J.P.; Mercer, R.B.; Newcomer, D.R.; Thornton, E.C.

    1998-09-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy (DOE) manages these activities through the Hanford Groundwater Monitoring Project (groundwater project), which is the responsibility of Pacific Northwest National Laboratory. The groundwater project does not include all of the monitoring to assess performance of groundwater remediation or all monitoring associated with active facilities. This document is the first integrated monitoring plan for the groundwater project and contains: well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; other, established monitoring plans by reference; and a master well/constituent/frequency matrix for the entire Hanford Site.

  9. NETting an Ally: Cooperative Planning Enhances Projects.

    ERIC Educational Resources Information Center

    Turner, Pat; Hendrix, Beasey

    1996-01-01

    Describes a social studies project cooperatively planned and taught by the library media specialist and a classroom teacher at the Cartersville Middle School in Cartersville, Georgia. The project teaches seventh graders to use traditional research skills as well as technological computer-based research skills to identify, locate, select,…

  10. Project Management: Essential Skill of Nurse Informaticists.

    PubMed

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed.

  11. Project Management: Essential Skill of Nurse Informaticists.

    PubMed

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed. PMID:27332201

  12. ICDF Complex Operations Waste Management Plan

    SciTech Connect

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  13. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  14. Project Specific Quality Assurance Plan (QAPP)

    SciTech Connect

    Huston, J.J.

    1994-11-01

    The Project QAPP`s describe the program and the planned actions which WHC will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C. The Project involves retrieving the high-heat waste from Tank 241-C-106 to close the safety issue associate with the tank, demonstrate initial waste retrieval technology for a Single Shell Tank, and provide feed for the Hanford Waste Vitrification Plant.

  15. 36 CFR 219.15 - Project and activity consistency with the plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Project and activity consistency with the plan. 219.15 Section 219.15 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.15 Project...

  16. 36 CFR 219.15 - Project and activity consistency with the plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Project and activity consistency with the plan. 219.15 Section 219.15 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.15 Project...

  17. 36 CFR 219.15 - Project and activity consistency with the plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Project and activity consistency with the plan. 219.15 Section 219.15 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land Management Planning § 219.15 Project...

  18. 11. GENERAL PLAN. Vasona Light Rail Project, Asbuilt Plan, Diridon ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. GENERAL PLAN. Vasona Light Rail Project, As-built Plan, Diridon Station Water Tank. Scale 1:200. Drawing no. SP701, submitted by Biggs Cardoss Associates, Inc., 1871 The Alameda, Suite 200, San Jose, California. Contract no. C326, CADD file 326SP701. Stamped by Roy M. Schnabel, California registered professional engineer no. C46828. - Southern Pacific Depot, Water Tower, 65 Cahill Street, San Jose, Santa Clara County, CA

  19. ART/Ada design project, phase 1: Project plan

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.

    1988-01-01

    The plan and schedule for Phase 1 of the Ada based ESBT Design Research Project is described. The main platform for the project is a DEC Ada compiler on VAX mini-computers and VAXstations running the Virtual Memory System (VMS) operating system. The Ada effort and lines of code are given in tabular form. A chart is given of the entire project life cycle.

  20. Building a Propulsion Experiment Project Management Environment

    NASA Technical Reports Server (NTRS)

    Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara

    2004-01-01

    What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.

  1. SAPHIRE 8 Software Project Plan

    SciTech Connect

    Curtis L.Smith; Ted S. Wood

    2010-03-01

    This project is being conducted at the request of the DOE and the NRC. The INL has been requested by the NRC to improve and maintain the Systems Analysis Programs for Hands-on Integrated Reliability Evaluation (SAPHIRE) tool set concurrent with the changing needs of the user community as well as staying current with new technologies. Successful completion will be upon NRC approved release of all software and accompanying documentation in a timely fashion. This project will enhance the SAPHIRE tool set for the user community (NRC, Nuclear Power Plant operations, Probabilistic Risk Analysis (PRA) model developers) by providing improved Common Cause Failure (CCF), External Events, Level 2, and Significance Determination Process (SDP) analysis capabilities. The SAPHIRE development team at the Idaho National Laboratory is responsible for successful completion of this project. The project is under the supervision of Curtis L. Smith, PhD, Technical Lead for the SAPHIRE application. All current capabilities from SAPHIRE version 7 will be maintained in SAPHIRE 8. The following additional capabilities will be incorporated: • Incorporation of SPAR models for the SDP interface. • Improved quality assurance activities for PRA calculations of SAPHIRE Version 8. • Continue the current activities for code maintenance, documentation, and user support for the code.

  2. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  3. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  4. Nurse manager residency program: an innovative leadership succession plan.

    PubMed

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence. PMID:24704735

  5. Role of strategic planning in engineering management

    NASA Technical Reports Server (NTRS)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  6. Spent Nuclear Fuel Project operational staffing plan

    SciTech Connect

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project`s current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M&O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M&O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins.

  7. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  8. Water Management Plan for Fort Buchanan, Puerto Rico

    SciTech Connect

    Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine

    2004-06-01

    This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.

  9. Project Execution Game (PEG): Training towards Managing Unexpected Events

    ERIC Educational Resources Information Center

    Zwikael, Ofer; Gonen, Amnon

    2007-01-01

    Purpose: Games are an effective teaching and classroom training tool, since they allow students to practise real-life events. In the area of project management, most games focus on the planning phase of a project. The current paper aims to describe a new game, called PEG--Project Execution Game. The uniqueness of this game is its focus on real…

  10. CCSF Management Plan, 2002/2003.

    ERIC Educational Resources Information Center

    City Coll. of San Francisco, CA.

    This is the 2001-2002 management plan for the City College of San Francisco (CCSF), California. The plan contains the following sections: (1) Overview of Planning and Budgeting; (2) Vision, Values, and Mission; (3) College Goals and Strategic Priorities; (4) Annual Institutional Plan CCSF 2002-03; (5) College Core Performance Indicators; and (6)…

  11. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues. PMID:24020323

  12. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  13. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    SciTech Connect

    Fix, N. J.

    2007-01-10

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  14. The Groundwater Performance Assessment Project Quality Assurance Plan

    SciTech Connect

    Luttrell, Stuart P.

    2006-05-11

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  15. Oak Ridge Reservation Waste Management Plan

    SciTech Connect

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  16. Waste management plan for the APT

    SciTech Connect

    England, J.L.

    1997-08-22

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required.

  17. FY 2015 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  18. FY 2016 - Stockpile Stewardship and Management Plan

    SciTech Connect

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  19. Oak Ridge National Laboratory Waste Management Plan

    SciTech Connect

    Not Available

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  20. Energy Strategic Planning & Sufficiency Project

    SciTech Connect

    Retziaff, Greg

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  1. Configuration Management Plan for the Tank Farm Contractor

    SciTech Connect

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  2. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  3. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of...

  4. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  5. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  6. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  7. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  8. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  9. Pecos River Water Management Project

    NASA Astrophysics Data System (ADS)

    Roberts, J. D.; James, S. C.

    2003-12-01

    Sandia National Laboratories is providing technical assistance to farmer members of the Carlsbad Irrigation District (CID) to better plan the storage, delivery, and application of water to the Carlsbad Project. The surface waters along the Pecos River are allocated by the State of New Mexico to three major entities: 1) The State of Texas - each year a percentage of water from the natural river flow must be delivered to Texas as governed by the Interstate Streams Commission; 2) CID farmer members - a fixed portion of water must be delivered to the farming members of the CID; and 3) wildlife - an amount of water must be allocated to support the wildlife habitat in the Pecos River, most notably, the endangered Pecos Bluntnose Shiner Minnow. The Pecos Bluntnose Shiner Minnow habitat preference is under investigation by other state and national agencies and preliminary work has established that water depth, water velocity, and sediment activity (dunes, ripples, etc.) are the key parameters influencing minnow habitat preference. The amount of water (river flow rate) necessary to maintain a preferable habitat to support this species has yet to be determined. With a limited amount of water in the Pecos River and its reservoirs, it is critical to allocate water efficiently such that habitat is maintained, the farmers of the CID are supported, and New Mexico meets its commitments to the State of Texas. This study investigates the relationship between flow rate in the river and water depth, water velocity, and sediment activity. The goal is to establish a predictive tool that supports informed decisions about water management practices along the Pecos River that will maximize water available for agriculture and the State of Texas while maintaining the aquatic habitat.

  10. Project management at a university

    NASA Astrophysics Data System (ADS)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  11. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  12. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    SciTech Connect

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  13. Social Impact Management Plans: Innovation in corporate and public policy

    SciTech Connect

    Franks, Daniel M.; Vanclay, Frank

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  14. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  15. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  16. Environmental planning and management in Greater Johannesburg.

    PubMed

    Von Schirnding, Y E

    1996-03-01

    This article describes the actions among urban environmental, management, and development planners in Greater Johannesburg, South Africa. Initiatives, such as the Healthy Cities Project and Model Communities, are being integrated into an environmental management and development approach that attains the goals of Agenda 21. Greater Johannesburg has housing shortages and homelessness. Priority needs include the areas of housing, water, electricity, public transportation, and sanitation. Clean water and air are inequitably distributed. Other key environmental problems include illegal dumping, inadequate waste disposal, poor environmental hygiene in overcrowded inner city areas, lack of open spaces, flooding, and water scarcities. The newly formed metropolitan authority offers opportunities to improve coordination and integration of environmental problems. Stakeholders from government at all levels, politicians, nongovernmental organizations, and the business sector formed an intersectoral, interdepartmental environment management committee in 1995. Stakeholders will integrate Agenda 21 within broader urban development plans and processes. The executive committee and the full council approved a set of guiding principles on environmental policy and an administrative framework for management. Four workshops were held to ensure a participatory consultation process in 1995. The WHO Collaborating Center for Urban Health will be used to facilitate the work of the Greater Johannesburg Metropolitan Council. Changes are being made in the way local governments work.

  17. Solid Waste Management Planning--A Methodology

    ERIC Educational Resources Information Center

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  18. SNL/CA Cultural Resources Management Plan.

    SciTech Connect

    Larsen, Barbara L.

    2005-11-01

    The SNL/CA Cultural Resources Management Plan satisfies the site's Environmental Management System requirement to promote long-term stewardship of cultural resources. The plan summarizes the cultural and historical setting of the site, identifies existing procedures and processes that support protection and preservation of resources, and outlines actions that would be initiated if cultural resources were discovered onsite in the future.3

  19. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  20. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  1. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  2. Integrated Waste Treatment Unit GFSI Risk Management Plan

    SciTech Connect

    W. A. Owca

    2007-06-21

    This GFSI Risk Management Plan (RMP) describes the strategy for assessing and managing project risks for the Integrated Waste Treatment Unit (IWTU) that are specifically within the control and purview of the U.S. Department of Energy (DOE), and identifies the risks that formed the basis for the DOE contingency included in the performance baseline. DOE-held contingency is required to cover cost and schedule impacts of DOE activities. Prior to approval of the performance baseline (Critical Decision-2) project cost contingency was evaluated during a joint meeting of the Contractor Management Team and the Integrated Project Team for both contractor and DOE risks to schedule and cost. At that time, the contractor cost and schedule risk value was $41.3M and the DOE cost and schedule risk contingency value is $39.0M. The contractor cost and schedule risk value of $41.3M was retained in the performance baseline as the contractor's management reserve for risk contingency. The DOE cost and schedule risk value of $39.0M has been retained in the performance baseline as the DOE Contingency. The performance baseline for the project was approved in December 2006 (Garman 2006). The project will continue to manage to the performance baseline and change control thresholds identified in PLN-1963, ''Idaho Cleanup Project Sodium-Bearing Waste Treatment Project Execution Plan'' (PEP).

  3. Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.

    ERIC Educational Resources Information Center

    Jacobs, Linda

    This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…

  4. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  5. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  6. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Eligible planning, urban... planning, urban environmental design and policy-planning-management-capacity building activities. (a.... Also, costs necessary to comply with the requirements of 24 CFR part 58, including project...

  7. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  8. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management. 206.438... Project management. (a) General. The State serving as grantee has primary responsibility for project management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for...

  9. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438... Project management. (a) General. The State serving as grantee has primary responsibility for project management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for...

  10. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management. 206.438... Project management. (a) General. The State serving as grantee has primary responsibility for project management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for...

  11. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management. 206.438... Project management. (a) General. The State serving as grantee has primary responsibility for project management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for...

  12. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management. 206.438... Project management. (a) General. The State serving as grantee has primary responsibility for project management and accountability of funds as indicated in 44 CFR part 13. The State is responsible for...

  13. Spent Nuclear Fuel (SNF) Project Execution Plan

    SciTech Connect

    LEROY, P.G.

    2000-11-03

    The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities.

  14. [Evaluation model for municipal health planning management].

    PubMed

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  15. 7 CFR 1250.314 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... Research and Promotion Order Definitions § 1250.314 Plans and projects. Plans and projects means those research, consumer and producer education, advertising, marketing, product development, and promotion...

  16. Project Portfolio Management for Academic Libraries: A Gentle Introduction

    ERIC Educational Resources Information Center

    Vinopal, Jennifer

    2012-01-01

    In highly dynamic, service-oriented environments like academic libraries, much staff time is spent on initiatives to implement new products and services to meet users' evolving needs. Yet even in an environment where a sound project management process is applied, if we're not properly planning, managing, and controlling the organization's work in…

  17. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  18. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan. Revised

    SciTech Connect

    Not Available

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level.

  19. Tailoring Small IT Projects in the Project Planning Phase

    ERIC Educational Resources Information Center

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  20. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  1. The flight planning - flight management connection

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.

    1984-01-01

    Airborne flight management systems are currently being implemented to minimize direct operating costs when flying over a fixed route between a given city pair. Inherent in the design of these systems is that the horizontal flight path and wind and temperature models be defined and input into the airborne computer before flight. The wind/temperature model and horizontal path are products of the flight planning process. Flight planning consists of generating 3-D reference trajectories through a forecast wind field subject to certain ATC and transport operator constraints. The interrelationships between flight management and flight planning are reviewed, and the steps taken during the flight planning process are summarized.

  2. Analysis of offsite emergency planning zones project

    SciTech Connect

    Petrocchi, A.J.; Armstrong, C.E. . Rocky Flats Plant); McKinney, J.M.; Verholek, M.G.; Fraser, P.J.; Dalfonso, P.H. )

    1991-07-18

    The Rocky Flats Plant maintains and uses significant nonradioactive chemically hazardous material (HAZMAT) inventories. Some of these materials are used in sufficient quantities to represent a credible risk to the offsite public in the event of an emergency at the facility. In Phase 2 of this project, the EG G Rocky Flats, Inc. and TENERA, L.P. Task Team (Task Team) produced an initial screening-level modeling analysis study and an Emergency Planning Zone (EPZ) encompassing the Vulnerable Zones (VZs) for hazardous materials stored at the facility. The screening-level analysis will be supplemented with more refined evaluations during subsequent phases of the project. The existence of these chemicals in the Rocky Flats Plant Occupational Health Information System (OHIS) chemical inventory database was verified. All liquid and gaseous chemicals were considered as potential hazardous material source terms for further screening analysis. Hazards associated with solid substances were not considered in this phase of the project. 2 figs., 13 tabs.

  3. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    VAN BEEK, J.E.

    2000-04-19

    This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering.

  4. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  5. 14 CFR 152.109 - Project eligibility: Airport planning.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152... TRANSPORTATION (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Eligibility Requirements and Application Procedures § 152.109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for...

  6. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., plans, and projects designed to strengthen the position of the Hass avocado industry in the domestic... 7 Agriculture 10 2014-01-01 2014-01-01 false Budgets, programs, plans, and projects. 1219.50... Order Budgets, Expenses, and Assessments § 1219.50 Budgets, programs, plans, and projects. (a) The...

  7. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., plans, and projects designed to strengthen the position of the Hass avocado industry in the domestic... 7 Agriculture 10 2011-01-01 2011-01-01 false Budgets, programs, plans, and projects. 1219.50... Order Budgets, Expenses, and Assessments § 1219.50 Budgets, programs, plans, and projects. (a) The...

  8. System integration test plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  9. Waste Isolation Pilot Plant, Land Management Plan

    SciTech Connect

    Not Available

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  10. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... Federal Highway Administration Integrated Corridor Management Deployment Planning Grants AGENCY: Federal... is extending the application period for the Integrated Corridor Management Deployment Planning Grants... Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to invite...

  11. 76 FR 53149 - North American Waterfowl Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... Fish and Wildlife Service North American Waterfowl Management Plan AGENCY: Fish and Wildlife Service... Wildlife Service, announce the availability of the draft North American Waterfowl Management Plan Revision... Plan Revision, which was developed in close consultation with the waterfowl management...

  12. Environmental management of water projects

    SciTech Connect

    Gangstad, E.O.; Stanley, R.A.

    1987-01-01

    This book is divided in three parts and contains the following: PART I: ENVIRONMENTAL ASSESSMENTS. Environmental conditions for water resource projects. Characteristics of some large scale reservoirs. Biological parameters of the TVA Eurasian watermilfoil management program. Ecological parameters influencing aquatic plant growth. Biological parameters influencing growth and reproduction of hydrilla. PART II: EVALUATION OF SELECTED AQUATIC HERBICIDES. Technical review of the factors affecting 2,4-D for aquatic use. Technical review of the factors affecting endothall for aquatic use. Technical review of factors affecting diquat for aquatic use. Technical review of the factors affecting use of dicamba. Technical review of the factors affecting aquatic use of dichlobenil. PART III: EVALUATION OF VEGETATION MANAGEMENT PROGRAMS. Strategies for aquatic vegetation management. (A) conversion of factors for U.S. and metric units. (B) Glossary of terms. Index.

  13. CH2M Hill Hanford Group Inc (CHG) Information Resource Management (IRM) Strategic Plan

    SciTech Connect

    NELSON, R.L.

    2000-06-06

    The CH2M HILL Hanford Group, Inc. (CHG), Information Resource Management Strategic Plan is the top-level planning document for applying information and information resource management to achieve the CHG mission for the management of the River Protection Project waste tank farm.

  14. Project X Accelerator R&D Plan

    SciTech Connect

    Not Available

    2008-01-31

    Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R&D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H{sup -} stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10{sup 13} H{sup -} ions delivered per pulse. H{sup -} are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10{sup 14} protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds

  15. Emergency management: expanding the disaster plan.

    PubMed

    Ross, Kevin L; Bing, Caryn M

    2007-06-01

    A comprehensive emergency management plan (CEMP) is key to minimizing the disruption of patient care and services during and after a natural or man-made disaster. The home health nurse can play a key role in enhancing, expanding, and evaluating the effectiveness of the organization's disaster plan. The components of a CEMP and lessons learned from actual implementation of disaster plans in home care are addressed. The disasters and emergencies of the past few years, such as threats of terrorism, hurricanes, floods, wildfires, tornadoes, and earthquakes, have validated the need to extend the emergency preparedness plan to a more comprehensive approach to emergency management. Communities, healthcare providers, and individuals/families all have been urged to take a more comprehensive look at their readiness for these types of events. Home healthcare organizations, including home health agencies, hospice providers, infusion providers, and medical equipment companies, can take a fresh and comprehensive look at their emergency management plan.

  16. Incorporating climate change projections into riparian restoration planning and design

    USGS Publications Warehouse

    Perry, Laura G.; Lindsay V. Reynolds,; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.

    2015-01-01

    Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.

  17. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    SciTech Connect

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  18. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  19. Hanford Sampling Quality Management Plan (HSQMP)

    SciTech Connect

    Hyatt, J.E.

    1995-04-28

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user`s guide to the Data Quality Objective process, and a self-assessment checklist.

  20. Special event planning for the emergency manager.

    PubMed

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan. PMID:20378490

  1. 76 FR 67400 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... TRANSPORTATION Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY... Capital Project Management to December 2, 2011, to allow interested parties time to carefully review the...) proposing to transform the current FTA rule for project management oversight into a discrete set...

  2. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  3. Time-Management Planning for Educational Facilities.

    ERIC Educational Resources Information Center

    McIsaac, Donald N.; And Others

    Three conference papers concerned with systems analysis and time management planning. One paper is concerned with techniques, especially the application of the "critical path method" or PERT (Program Evaluation Review Technique) in planning construction activities. A second paper concerns problems associated with collecting and communicating…

  4. Planning and Managing School Facilities. Second Edition.

    ERIC Educational Resources Information Center

    Kowalski, Theodore J.

    This book addresses the administrative procedures associated with planning and managing school facilities. As noted at the outset, practitioner interest in school facilities has been growing rapidly in recent years because decades of neglect, poor planning, and cost cutting have created a situation in which large numbers of America's school…

  5. Do You Have a Crisis Management Plan?

    ERIC Educational Resources Information Center

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  7. Production roll out plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects, General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.

  8. Tank Waste Remediation System Projects Document Control Plan

    SciTech Connect

    Slater, G.D.; Halverson, T.G.

    1994-09-30

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project.

  9. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  10. Managing the Challenges of Leadership in ERP Implementations: An Exploratory Study of the Leadership Challenges Encountered by Project Managers Involved in ERP Implementation Projects

    ERIC Educational Resources Information Center

    Wanjagi, James K.

    2013-01-01

    Increasingly, organizations are conducting more Enterprise Resource Planning (ERP) projects in order to promote organizational efficiencies. Meanwhile, minimal research has been conducted on the leadership challenges faced by project managers during the ERP project implementations and how these challenges are managed. The existing project…

  11. Incentive pay plans boost managers' performance.

    PubMed

    Biggs, D P

    1987-03-01

    Incentive compensation, which has become commonplace in highly competitive industries, is gradually being introduced in health care settings. Although it has not been used extensively in not-for-profit hospitals, its advantages make it a natural tool for administrators who want to retain their best managers and to achieve important special objectives. Management incentives--awards based on the accomplishment of special objectives--enable boards of trustees and senior managers not only to meet difficult hospital objectives but also to attract and motivate key managers and to promote participative management and teamwork. An effective management incentive compensation program requires five support systems: strategic and operating plans; annual objectives for each manager derived from the strategic and operating plans; measureable performance standards; management action plans, which incorporate the objectives and performance standards and are used in directing each manager's efforts; and a performance evaluation system that forces tough yet reasonable evaluations. In addition to these systems, senior managers must exhibit commitment to change, and objectives must go beyond simply managing individual units well, targeting such goals as improvement of outpatient care utilization, recruitment of specialized staff physicians, and the creation of preferred provider and health maintenance organizations.

  12. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... National Park Service General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final... Management Plan/Wilderness Study/Off-Road Vehicle Management Plan (FEIS/GMP/WS/ORV Plan), Big Cypress... proposed wilderness (about 37,567 acres), and develop limited new hiking-only trails. The entire...

  13. Hanford Waste Vitrification Plant Project Plan. Revision 1

    SciTech Connect

    Brown, R.W.

    1993-06-01

    A major mission of the US DOE is the permanent disposal of Hanford defense wastes by safe, environmentally acceptable, and cost effective methods which meet applicable regulations. The Hanford Waste Vitrification Plant (HWVP) Project was initiated to immobilize the Hanford high-level waste (HLW) and provide interim storage. The HWVP will vitrify the pre-treated HLW into borosilicate glass, cast the glass into stainless steel canisters, and store the canisters on site until they are shipped to a federal geologic repository. The HWVP project objective is to design, construct, and operate a facility for immobilizing defense high-level waste for storage. Technical objectives include using the Defense Waste Processing Facility designed plants systems or elements, where practical, and the exchange and review of information on plants in foreign countries. More definitive objectives for quality, reliability, environmental, and safety are provided in the HWVP Project Management Plan.

  14. Tank waste remediation system privatization phase 1 infrastructure project, systems engineering implementation plan

    SciTech Connect

    Schaus, P.S.

    1998-08-19

    This Systems Engineering Implementation Plan (SEIP) describes the processes, products, and organizational responsibilities implemented by Project W-519 to further define how the project`s mission, defined initially by the Tank Waste Remediation System Phase 1 Privatization Infrastructure Project W-503 Mission Analysis Report (Hoertkorn 1997), will be accomplished using guidance provided by the Tank Waste Remediation System Systems Engineering Management Plan (SEMP) (Peck 1998). This document describes the implementation plans for moving from a stated mission to an executable cost, schedule, and technical baseline and to help ensure its successful completion of those baselines.

  15. Planning, Designing and Managing Higher Education Institutions

    ERIC Educational Resources Information Center

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  16. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  17. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    SciTech Connect

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed

  18. Oregon Wildlife Planning Coordination Project, October 1, 1998 to September 30, 1999 Annual Report.

    SciTech Connect

    Barnes, Susan P.

    1999-10-05

    The intent of the Oregon Wildlife Planning Coordination project is to fund Oregon Department of Fish and Wildlife (ODFW) staff to facilitate wildlife mitigation coordination and planning between Oregon wildlife managers. The primary goal of ODFW wildlife mitigation planning/coordination staff is to foster, facilitate, and manage a statewide cooperative wildlife mitigation planning and implementation effort between the Oregon wildlife managers (the Oregon Wildlife Coalition or OWC) to mitigate for wildlife losses in Oregon caused by the development and operation of the hydropower system.

  19. OCRWM Systems Engineering Management Plan (SEMP). Revision 3

    SciTech Connect

    Not Available

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.

  20. The readability of federal land management plans

    NASA Astrophysics Data System (ADS)

    Gallagher, Thomas J.; Patrick-Riley, Kent

    1989-01-01

    Regulations to implement the National Environmental Policy Act state that environmental impact statements shall be written in “plain language”. Federal land management agencies operate under this guideline when they prepare plans for their lands. We examined 23 agency plans, using the Flesch Reading Ease Scale, to determine if they met this criterion. The scores show that the plans are written for people with three to six years of college education, far beyond the reading ability of the average person. The results suggest that the plans may limit or bias who participates in agency planning. National policy on the readability of the plans needs to be clarified, and agencies need to evaluate, and defend or revise, their writing programs.

  1. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    SciTech Connect

    HALL, L.R.

    2000-02-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents.

  2. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  3. Database Design for Preservation Project Management: The California Newspaper Project.

    ERIC Educational Resources Information Center

    Hayman, Lynne M.

    1997-01-01

    Describes a database designed to manage a serials preservation project in which issues from multiple repositories are gathered and collated for preservation microfilming. Management information, added to bibliographic and holdings records, supports the production of reports tracking preservation activity. (Author)

  4. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  5. Real-Time Projection to Verify Plan Success During Execution

    NASA Technical Reports Server (NTRS)

    Wagner, David A.; Dvorak, Daniel L.; Rasmussen, Robert D.; Knight, Russell L.; Morris, John R.; Bennett, Matthew B.; Ingham, Michel D.

    2012-01-01

    The Mission Data System provides a framework for modeling complex systems in terms of system behaviors and goals that express intent. Complex activity plans can be represented as goal networks that express the coordination of goals on different state variables of the system. Real-time projection extends the ability of this system to verify plan achievability (all goals can be satisfied over the entire plan) into the execution domain so that the system is able to continuously re-verify a plan as it is executed, and as the states of the system change in response to goals and the environment. Previous versions were able to detect and respond to goal violations when they actually occur during execution. This new capability enables the prediction of future goal failures; specifically, goals that were previously found to be achievable but are no longer achievable due to unanticipated faults or environmental conditions. Early detection of such situations enables operators or an autonomous fault response capability to deal with the problem at a point that maximizes the available options. For example, this system has been applied to the problem of managing battery energy on a lunar rover as it is used to explore the Moon. Astronauts drive the rover to waypoints and conduct science observations according to a plan that is scheduled and verified to be achievable with the energy resources available. As the astronauts execute this plan, the system uses this new capability to continuously re-verify the plan as energy is consumed to ensure that the battery will never be depleted below safe levels across the entire plan.

  6. Myopia management: multihospital portfolio planning.

    PubMed

    Irish, G G

    1987-10-01

    The acquisition and divestiture of organizational business units demonstrate management's strategy in response to an evolving marketplace. From a strategic perspective, the most significant danger to a corporation is not having the "right" portfolio of businesses or products to respond to the marketplace. This article describes a conceptual model that a multihospital system executive might use to determine the growth and diversification of the organization's portfolio of businesses. The model involves the application of market, financial, and microeconomic theories in a logical sequence to assist management in making business acquisition and divestiture decisions.

  7. Project Plan for Vertical Lift Machine

    SciTech Connect

    Ellsworth, G F

    2002-08-05

    This document describes the Project Plan for the development and manufacture of a Vertical Lift Machine. It is assumed by this project plan that the Vertical Lift Machine will be developed, designed, manufactured, and tested by a qualified vendor. LLNL will retain review and approval authority for each step given in this project plan. The Vertical Lift Machine is a single linear axis positioning device capable of lifting objects vertically at controlled rates and positioning them repeatedly at predetermined heights, in relation to other objects suspended from above, for high neutron multiplication experiments. Operation of the machine during the experiments is done remotely. The lift mechanism shall accommodate various platforms (tables) that support the objects to be raised. A frame will support additional subassemblies from above such that the lower subassembly can be raised close to and/or interface with those above. The structure must be stiff and motion of the table linear such that radial alignment is maintained (e.g. concentricity). The safe position for the Vertical Lift Machine is the lift mechanism fully retracted with the subassemblies fully separated. The machine shall reside in this position when not in use. It must return to this safe condition from any position upon failure of power sources, open safety interlocks, or operator initiated SCRAM. The Vertical Lift Machine shall have the capability of return to the safe position with no externally applied power. The Vertical Lift Machine shall have dual operator interfaces, one near the machine and another located in a remote control room. Conventional single key, key-lock switching shall be implemented to lock out the control interface not in use. The interface at the machine will be used for testing and ''dry running'' experimental setup(s) with inert subassemblies (i.e. Setup Mode). The remote interface shall provide full control and data recording capability (i.e. Assembly Mode). The control system

  8. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    PubMed

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy. PMID:25474668

  9. Planning for a smooth transition: evaluation of a succession planning program for prospective nurse unit managers.

    PubMed

    Manning, Vicki; Jones, Alan; Jones, Pamela; Fernandez, Ritin S

    2015-01-01

    The current and projected nurse workforce shortage has created significant pressure on health care organizations to examine their approach to managing talent. This includes the need for strategic development of new formal leaders. This article reports on a succession planning program for prospective nursing unit managers. Eight prospective management candidates participated in a Future Nursing Unit Managers program. The effectiveness of the program was measured through a comparison of pre- and postprogram surveys relating to participants' perception of personal managerial and leadership skills. Significant differences in scores from baseline to 6-month follow-up surveys were observed in the participants' confidence in undertaking the nursing unit manager role and in their management skills. Investment in structured programs to prepare nurses for leadership roles is strongly recommended as a management workforce strategy.

  10. Basic Project Management Methodologies for Survey Researchers.

    ERIC Educational Resources Information Center

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  11. Parallels between Project Management and Instructional Design.

    ERIC Educational Resources Information Center

    Layng, Jacqueline

    1997-01-01

    Describes the stages of project management and instructional design. Outlines and compares the roles of project managers and instructional designers, and discusses how designers need to use a systematic approach which combines the stages of each process to remain detail-oriented while being cognizant of the entire project. (AEF)

  12. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  13. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  14. 78 FR 16460 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal... revise the agency's project management oversight regulations, in light of the recent, fundamental changes... Progress in the 21st Century Act (``MAP-21''). FTA will reinitiate a rulemaking for project...

  15. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  16. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  17. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  18. Management plan for Facility Effluent Monitoring Plan activities

    SciTech Connect

    Nickels, J.M.; Pratt, D.R.

    1991-08-01

    The DOE/RL 89-19, United States Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (1989), requires the Hanford Site to prepare an Environmental Monitoring Plan (EMP) by November 9, 1991. The DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (1991), provides additional guidance and requires implementation of the EMP within 36 months of the effective data of the rule. DOE Order 5400.1, General Environmental Protection Program, requires each US Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials to prepare an EMP. This EMP is to identify and discuss two major activities: (1) effluent monitoring and (2) environmental surveillance. At the Hanford Site, the site-wide EMP will consist of the following elements: (1) A conceptual plan addressing effluent monitoring and environmental surveillance; (2) Pacific Northwest Laboratory (PNL) site-wide environmental surveillance program; (3) Westinghouse Hanford Company (Westinghouse Hanford) effluent monitoring program consisting of the near-field operations environmental monitoring activities and abstracts of each Facility Effluent Monitoring Plan (FEMP). This management plan addresses the third of these three elements of the EMP, the FEMPs.

  19. 12 strategies for managing capital projects.

    PubMed

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods. PMID:23678692

  20. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  1. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  2. Waste management for Shippingport Station Decommissioning Project: Extended summary

    SciTech Connect

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station (SSDP) is demonstrating that the techniques and methodologies of waste management, which are currently employed by the nuclear industry, provide adequate management and control of waste activities for the decommissioning of a large scale nuclear plant. The SSDP has some unique aspects in that as part of the objective to promote technology transfer, multiple subcontractors are being utilized in the project. The interfaces resulting from multiple subcontractors require additional controls. Effective control has been accomplished by the use of a process control and inventory system, coupled with personnel training in waste management activities. This report summarizes the waste management plan and provides a status of waste management activities for SSDP.

  3. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  4. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  5. Hanford cultural resources management plan

    SciTech Connect

    Chatters, J.C.

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  6. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.105 What must be... Management Standard. (6) Ensure that: (i) Its Environmental Management Plan is available to laboratory..., Laboratory Environmental Management Standard performance data, assessment and audit results and...

  7. Data Management Facility Operations Plan

    SciTech Connect

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  8. ORNL long-range environmental and waste management plan

    SciTech Connect

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  9. 75 FR 11508 - Revision of Land Management Plan for the Uwharrie National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... activities on the forests is not a decision made in the forest plan but occurs through subsequent project... involvement and collaboration on revising the Uwharrie's Forest Plan has already occurred. Discussions with... Forest Service Revision of Land Management Plan for the Uwharrie National Forest AGENCY: Forest...

  10. Projectizing the development and/or maintenance process for emergency response/contingency plans

    SciTech Connect

    A. A. Francis

    2000-07-01

    The attainment of established goals and objects is essential and paramount for all successful projects in business and industry, including the development and/or maintenance of emergency response/contingency plans. The need for effective project management is an ongoing effort. As with any aspect of business, better ways of managing projects have been and are being developed. Those organizations that take the lead in implementing these capabilities consistently perform their projects better, and in the case of emergency management, provide better protection to employees, property, and the environment.

  11. Plan for CELSS test bed project

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1986-01-01

    The Closed Ecological Life Support Systems (CELSS) testbed project will achieve two major goals: It will develop the knowledge and technology needed to build and test biological or combined biological physiochemical regenerative life support systems. It will fabricate, test, and operate ground based facilities to accomplish proof-of-concent testing and evaluation leading to flight experimentation. The project will combine basic research and applied research/engineering to achieve a phased, integrated development of hardware, systems, and techniques for food and oxygen production, food processing, and waste processing in closed systems. The project will design, fabricate, and operate within three years a botanical production system scaled to a sufficient size to verify oxygen and nutrient load production (carbohydrates, fats, proteins) at a useable level. It will develop within five years a waste management system compatible with the botanical production system and a food processing system that converts available biomass into edible products. It will design, construct, and operate within ten years a ground based candidate CELSS that includes man as an active participant in the system. It will design a flight CELSS module within twelve years and construct and conduct initial flight tests within fifteen years.

  12. Teaching family planning management and evaluation skills.

    PubMed

    Gorosh, M E; Helbig, D W; Revson, J E

    1980-01-01

    In the last several years the need for training schemes in family planning programme administration has become increasingly apparent with the rapid growth of family planning services throughout the world. This paper reports on the development and use of a series of 16 practical classroom training exercises designed for teaching planning, management and evaluation skills. Each exercise can be introduced, worked and discussed in a morning or an afternoon. It is available in an individual booklet, which contains worksheets, blank tables and step-by-step instructions for working the exercise, along with a discussion of the skills being taught. Topics covered include demographic rates and concepts, the Dryfoos-Polgar-Varkey formula, risk factor analysis, target-setting, case load forecasting, service statistics, contraceptive supplies, manpower planning, couple-year of protection, cost-effectiveness, contraceptive use-effectiveness, life table techniques, numerator analysis, fertility pattern method, sampling methods and questionnaire design. These curriculum materials concentrate on imparting through the medium of actual experience a series of specific management techniques of a quantitative nature that will enhance the ability of the trainees to plan, administer and evaluate any family planning programme anywhere in the world. The exercises in this series have been tested in the family planning training programmes at Columbia University and at Downstate Medical Center in New York. They have also been used in WHO workshops in Thailand and Tanzania and in training programmes in France, Kenya and Nicaragua.

  13. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  14. Savannah River Site Geographic Information System management plan

    SciTech Connect

    Gordon, D.E.

    1992-02-01

    A plan for managing the development of Geographic Information System (GIS) applications at the Savannah River Site (SRS) in a coordinated, integrated fashion has been developed. Included in the plan are discussions on the guidance for GIS activities at the site, the overall strategy for managing GIS applications development, the specific administrative and programmatic tasks with projected completion schedules, and the organizational structure in place to direct this GIS effort. The Department of Energy-Savannah River Field Office (DOE-SR) has encouraged all primary subcontracting organizations at SRS involved with the mapping of spatial data to coordinate their efforts and be more cost effective. This plan provides a description of organized activities in 1992 for establishing a coordinated approach for developing and implementing GIS technology.

  15. Developing Instructional Technology Products Using Effective Project Management Practices

    ERIC Educational Resources Information Center

    Allen, Stephanie; Hardin, Paul C.

    2008-01-01

    Delivering a successful instructional technology (IT) product depends on more than just having an extremely creative instructional solution or following an instructional systems design (ISD) model. Proper planning, direction, and execution of the project are require, as well. We present a model of management that encompasses the ISD process. Five…

  16. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  17. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  18. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  19. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  20. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  1. 7 CFR 1220.117 - Plans and projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE SOYBEAN PROMOTION, RESEARCH, AND CONSUMER INFORMATION Soybean Promotion and Research Order Definitions § 1220.117 Plans and projects....

  2. Oregon Projections, Appendix C. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Buck, James E.

    The purpose of this report is to provide the ComField Project with realistic, current data for future Oregon elementary education contexts, which will serve as partial verification and support for the program, set procedure for future local predictions, and provide local projections for the Phase 2 final report. It covers nine general areas: 1)…

  3. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Hayley, Elizabeth; Curley, Su; Walsh, Mary

    2011-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

  4. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  6. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  7. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  8. River Protection Project (RPP) Dangerous Waste Training Plan

    SciTech Connect

    POHTO, R.E.

    2000-03-09

    This supporting document contains the training plan for dangerous waste management at River Protection Project TSD Units. This document outlines the dangerous waste training program developed and implemented for all Treatment, Storage, and Disposal (TSD) Units operated by River Protection Project (RPP) in the Hanford 200 East, 200 West and 600 Areas and the <90 Day Accumulation Area at 209E. Operating TSD Units managed by RPP are: the Double-Shell Tank (DST) System, 204-AR Waste Unloading Facility, Grout, and the Single-Shell Tank (SST) System. The program is designed in compliance with the requirements of Washington Administrative Code (WAC) 173-303-330 and Title 40 Code of Federal Regulations (CFR) 265.16 for the development of a written dangerous waste training program and the Hanford Facility Permit. Training requirements were determined by an assessment of employee duties and responsibilities. The RPP training program is designed to prepare employees to operate and maintain the Tank Farms in a safe, effective, efficient, and environmentally sound manner. In addition to preparing employees to operate and maintain the Tank Farms under normal conditions, the training program ensures that employees are prepared to respond in a prompt and effective manner should abnormal or emergency conditions occur. Emergency response training is consistent with emergency responses outlined in the following Building Emergency Plans: HNF-IP-0263-TF and HNF-=IP-0263-209E.

  9. Fast Flux Test Facility project plan. Revision 2

    SciTech Connect

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  10. Environmental restoration and waste management department independent safety review committee program management plan

    SciTech Connect

    Not Available

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER WMD). The ISRC performs independent safety reviews for the ER WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term program'' to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER WMD Implementing Program Management Plan, EGG-WM-10220.

  11. Environmental restoration and waste management department independent safety review committee program management plan

    SciTech Connect

    Not Available

    1992-10-01

    This Program Management Plan (PMP) describes and governs the Independent Safety Review Committee (ISRC) established within the Environmental Restoration and Waste Management Department (ER&WMD). The ISRC performs independent safety reviews for the ER&WMD as required and specified by the governing documents mentioned above. This PMP defines the ISRC organization, work plan, and scope of work. The PMP is organized consistent with the requirements of DOE Order 4700.1, Project Management System. For the purpose of readability, this document shall use the term ``program`` to include not only the chartered activities of the ISRC, but also the related activities conducted by the chairman and staff. This PMP is subordinate to the ER&WMD Implementing Program Management Plan, EGG-WM-10220.

  12. Hanford site integrated pest management plan

    SciTech Connect

    Giddings, R.F.

    1996-04-09

    The Hanford Site Integrated Pest Management Plan (HSIPMP) defines the Integrated Pest Management (IPM) decision process and subsequent strategies by which pest problems are to be solved at all Hanford Site properties per DOE-RL Site Infrastructure Division memo (WHC 9505090). The HSIPMP defines the roles that contractor organizations play in supporting the IPM process. In short the IPM process anticipates and prevents pest activity and infestation by combining several strategies to achieve long-term pest control solutions.

  13. Integrated development and testing plan for the plutonium immobilization project

    SciTech Connect

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology, this is accomplished by encapsulating the plutonium

  14. Data management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  15. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  16. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  17. Developing a strategic marketing plan for physical and occupational therapy services: a collaborative project between a critical access hospital and a graduate program in health care management.

    PubMed

    Kash, Bita A; Deshmukh, A A

    2013-01-01

    The purpose of this study was to develop a marketing plan for the Physical and Occupational Therapy (PT/OT) department at a Critical Access Hospital (CAH). We took the approach of understanding and analyzing the rural community and health care environment, problems faced by the PT/OT department, and developing a strategic marketing plan to resolve those problems. We used hospital admissions data, public and physician surveys, a SWOT analysis, and tools to evaluate alternative strategies. Lack of awareness and negative perception were key issues. Recommended strategies included building relationships with physicians, partnering with the school district, and enhancing the wellness program.

  18. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  19. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  20. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    ERIC Educational Resources Information Center

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  1. Mini-Muddling: Learning from Project Plan Deviations

    ERIC Educational Resources Information Center

    Hallgren, Markus; Wilson, Timothy L.

    2007-01-01

    Purpose: This paper aims to contribute to the understanding of the informal and incidental learning that takes place in project work among individuals who must adapt to deviations from project plans. Design/methodology/approach: Reflections in the study are built on four power plant projects found in an integrated provider of projects of this…

  2. Management Matters: Planning Goals and Time

    ERIC Educational Resources Information Center

    Pappas, Marjorie L.

    2004-01-01

    This article discusses the importance of setting and implementing goals that can help change and improve a library media program over time--goals that go beyond merely keeping the library media center running. Suggestions for developing an action plan and strategies for effective time management are also presented.

  3. Hanford emergency management plan - release 15

    SciTech Connect

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  4. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  5. National ignition facility environment, safety, and health management plan

    SciTech Connect

    1995-11-01

    The ES&H Management Plan describes all of the environmental, safety, and health evaluations and reviews that must be carried out in support of the implementation of the National Ignition Facility (NIF) Project. It describes the policy, organizational responsibilities and interfaces, activities, and ES&H documents that will be prepared by the Laboratory Project Office for the DOE. The only activity not described is the preparation of the NIF Project Specific Assessment (PSA), which is to be incorporated into the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (PEIS). This PSA is being prepared by Argonne National Laboratory (ANL) with input from the Laboratory participants. As the independent NEPA document preparers ANL is directly contracted by the DOE, and its deliverables and schedule are agreed to separately with DOE/OAK.

  6. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    SciTech Connect

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports.

  7. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  8. National Ignition Facility Risk Management Plan, Revision 2

    SciTech Connect

    Brereton, S J

    2002-06-01

    The National Ignition Facility (NIF) Risk Management Plan (LLNL, 1997a) was originally prepared in 1997 in accordance with the Department of Energy (DOE) Life Cycle Asset Management Good Practice Guide (DOE, 1996a) and supported NIF Critical Decision 3, approval to initiate construction (DOE, 1997a). The plan was updated in 1998 to reflect realized risks such as the finding and successful clean up of polychlorinated biphenyl (PCB)-filled electrical capacitors at the NIF excavation during initial construction and the litigation of the Programmatic Environmental Impact Statement for Stockpile Stewardship (DOE, 1996b) by a group of non-governmental organizations led by the Natural Resources Defense Council. The current update of the Risk Management Plan brings it into compliance with the applicable DOE Orders and Standards and addresses new risks, such as assuring safety during the period when construction, special equipment installation, and commissioning are occurring simultaneously at the NIF site, and the extensive use of models to manage technical performance risk. The objectives of the updated plan are to: (1) Identify the risks to the completion of the Project in terms of meeting performance and regulatory requirements, ES&H, cost, and schedule; (2) Assess or the risks in terms of likelihood of occurrence and their impact potential relative to technical performance, ES&H, costs, and schedule; and (3) Address suitable risk mitigation measures for each identified risk.

  9. Trade-Offs, Biases, and Uncertainty in Project Planning and Execution: A Problem-Based Simulation Exercise

    ERIC Educational Resources Information Center

    Smith-Daniels, Dwight E.; Smith-Daniels, Vicki L.

    2008-01-01

    The ability to plan and execute projects is a fundamental skill required among managers and business school graduates. In the opening phase of a project, the project team makes decisions about the relative priority of project time, cost, and performance objectives, oftentimes without complete information about customer and stakeholder…

  10. Issues in NASA program and project management. Special Report: 1993 conference

    NASA Technical Reports Server (NTRS)

    Hoffman, ED (Editor); Kishiyama, Jenny S. (Editor)

    1993-01-01

    This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

  11. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  12. Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

    SciTech Connect

    Alleman, Glen B.; Nosbisch, Michael R.

    2012-07-01

    DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

  13. 7 CFR 1209.40 - Programs, plans, and projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., marketing, and use of mushrooms and mushroom products, and the creation of new products thereof, to the end... mushrooms or mushroom product shall be made. In addition, no program, plan, or project shall make use of... 7 Agriculture 10 2010-01-01 2010-01-01 false Programs, plans, and projects. 1209.40 Section...

  14. Nevada Test Site Resource Management Plan

    SciTech Connect

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  15. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  16. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  17. 324 Building liquid waste handling and removal system project plan

    SciTech Connect

    Ham, J.E.

    1998-07-29

    This report evaluates the modification options for handling radiological liquid waste generated during decontamination and cleanout of the 324 Building. Recent discussions indicate that the Hanford site railroad system will be closed by the end of FY 1998 necessitating the need for an alternate transfer method. The issue of handling of Radioactive Liquid Waste (RLW) from the 324 Building (assuming the 340 Facility is not available to accept the RLW) has been examined in at least two earlier engineering studies (Parsons 1997a and Hobart 1997). Each study identified a similar preferred alternative that included modifying the 324 Building RLWS to allow load-out of wastewater to a truck tanker, while making maximum use of existing piping, tanks, instrumentation, controls and other features to minimize costs and physical changes to the building. This alternative is accepted as the basis for further discussion presented in this study. The goal of this engineering study is to verify the path forward presented in the previous studies and assure that the selected alternative satisfies the 324 Building deactivation goals and objectives as currently described in the project management plan. This study will also evaluate options available to implement the preferred alternative and select the preferred option for implementation of the entire system. Items requiring further examination will also be identified. Finally, the study will provide a conceptual design, schedule and cost estimate for the required modifications to the 324 Building to allow removal of RLW. Attachment 5 is an excerpt from the project baseline schedule found in the Project Management Plan.

  18. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    SciTech Connect

    Golder Associates, Inc.

    2003-04-22

    four-year schedule for acquisition, protection, and restoration of the 25 highest ranked properties. The proposed acquisition order recognizes the outstanding character of habitat and apparent connectivity benefits among the 15 highest-ranking parcels. The time critical nature of subdivision and zoning changes of specific parcels within the UGA has also been considered. Priority area properties are considered to have the highest need for immediate acquisition and preservation and are recommended for acquisition as a group. The remaining ten properties were grouped as medium and low priority within the acquisition order and are recommended for acquisition on an individual basis. This plan also details the importance of long-term land management, restoration and monitoring of properties acquired and protected through the Yakima Habitat Improvement Project.

  19. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  20. Management by Objectives and Program Planning and Budgeting Systems: A Guidebook for Developing a Model Local Annual Plan and a Model Local Five-Year Plan for Vocational Education.

    ERIC Educational Resources Information Center

    Ignas, Edward

    The guidebook is intended to acquaint vocational educators with two specific management strategies: Management by Objectives (MBO) and the Program Planning and Budget System (PPBS). The long range goal of this project is the formation of a model local annual plan and model five year plan for vocational education in local school districts…