Space station human productivity study. Volume 5: Management plans
NASA Technical Reports Server (NTRS)
1985-01-01
The 67 Management Plans represent recommended study approaches for resolving 108 of the 305 Issues which were identified. Each study Management Plan is prepared in three formats: Management Plan Overview (lists the subsumed Issues, study background, and related overview information); Study Plan (details the study approach by tasks, lists special needs, and describes expected study products); Schedule-Task Flow (provides a time-lined schedule for the study tasks and resource requirements). The Management Relationships Matrix, included in this volume, shows the data input-output relationships among all recommended studies. A listing is also included which cross-references the unresolved requirements to Issues to management plans. A glossary of all abbreviations utilized is provided.
DOT National Transportation Integrated Search
1995-12-01
Development Center in evaluating current Coast Guard policies and development plans for : Waterways Management, a "Waterways Management Research and Planning" task plan was : established as Task Area A in FY '94. The purpose of this task area is to d...
Still Not Enough Time in the Day: Media Specialists, Program Planning and Time Management, Part II
ERIC Educational Resources Information Center
Fitzgerald, Mary Ann; Waldrip, Andrea
2004-01-01
The ways in which one can keep the library media plan on track in the face of the realistic challenges faced by media are discussed. A system for prioritizing tasks, both planned goal-related tasks and tasks that walk in the door in varying degrees of emergency status and by need of more time management strategies could be used. [For Part I, see…
Hazardous waste management at the local level; The Anchorage, Alaska experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wigglesworth, D.
1989-07-01
The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less
Task analysis of information technology-mediated medication management in outpatient care.
van Stiphout, F; Zwart-van Rijkom, J E F; Maggio, L A; Aarts, J E C M; Bates, D W; van Gelder, T; Jansen, P A F; Schraagen, J M C; Egberts, A C G; ter Braak, E W M T
2015-09-01
Educating physicians in the procedural as well as cognitive skills of information technology (IT)-mediated medication management could be one of the missing links for the improvement of patient safety. We aimed to compose a framework of tasks that need to be addressed to optimize medication management in outpatient care. Formal task analysis: decomposition of a complex task into a set of subtasks. First, we obtained a general description of the medication management process from exploratory interviews. Secondly, we interviewed experts in-depth to further define tasks and subtasks. Outpatient care in different fields of medicine in six teaching and academic medical centres in the Netherlands and the United States. 20 experts. Tasks were divided up into procedural, cognitive and macrocognitive tasks and categorized into the three components of dynamic decision making. The medication management process consists of three components: (i) reviewing the medication situation; (ii) composing a treatment plan; and (iii) accomplishing and communicating a treatment and surveillance plan. Subtasks include multiple cognitive tasks such as composing a list of current medications and evaluating the reliability of sources, and procedural tasks such as documenting current medication. The identified macrocognitive tasks were: planning, integration of IT in workflow, managing uncertainties and responsibilities, and problem detection. All identified procedural, cognitive and macrocognitive skills should be included when designing education for IT-mediated medication management. The resulting framework supports the design of educational interventions to improve IT-mediated medication management in outpatient care. © 2015 The Authors. British Journal of Clinical Pharmacology published by John Wiley & Sons Ltd on behalf of The British Pharmacological Society.
Analysis of Workplace Health Education Performed by Occupational Health Managers in Korea.
Kim, Yeon-Ha; Jung, Moon-Hee
2016-09-01
To evaluate workplace health education as practiced by occupational health managers based on standardized job tasks and suggest priority tasks and areas to be trained. The study was conducted between November 10, 2013 and April 30, 2014. The tool used in this study was standardized job tasks of workplace health education for occupational health managers which was developed through methodological steps. It was evaluated by 233 worksite occupational health managers. Data were analyzed using SPSS 21.0. Predicting variables of workplace health education performance were the "analysis and planning" factor, type of enterprise, and form of management. Healthcare professionals and occupational health managers who managed the nonmanufacturing industry showed high importance and low performance level in "analysis and planning" factor. "Analysis and planning" skill is priority training area for healthcare professionals and occupational health managers who managed nonmanufacturing industry. It is necessary to develop a training curriculum for occupational health managers that include improving analysis of worksites and plans for a health education program. Copyright © 2016. Published by Elsevier B.V.
Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan
NASA Technical Reports Server (NTRS)
Smith, Janice F. (Compiler); Forrest, Larry
1993-01-01
A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Planning and Managing Learning Tasks and Activities. Advances in Research on Teaching. Volume 3.
ERIC Educational Resources Information Center
Brophy, Jere, Ed.
This publication is the third volume in the "Advanced in Research on Teaching" series, which has been established to provide state-of-the-art conceptualization and analysis of the processes involved in functioning as a classroom teacher. This volume focuses on the planning and managing of learning tasks and activities, in particular,…
Planning for the Business of Education.
ERIC Educational Resources Information Center
Nutt, Andy
There are two levels of planning: strategic and operational. Strategic planning takes place at the upper levels of management and relates to the longrange objectives of an organization. Operational planning takes place at the middle, or lower, management echelon and deals with the implementation of strategic plans. It is the task of the chief…
USDOT guidance summary for connected vehicle deployments : safety management.
DOT National Transportation Integrated Search
2016-07-01
This document provides guidance material in regards to safety management plan for the CV Pilots DeploymentConcept Development Phase. This guidance provides key concepts and references in developing the SafetyManagement Plan in Task 4, lists relevant ...
Planning and task management in Parkinson's disease: differential emphasis in dual-task performance.
Bialystok, Ellen; Craik, Fergus I M; Stefurak, Taresa
2008-03-01
Seventeen patients diagnosed with Parkinson's disease completed a complex computer-based task that involved planning and management while also performing an attention-demanding secondary task. The tasks were performed concurrently, but it was necessary to switch from one to the other. Performance was compared to a group of healthy age-matched control participants and a group of young participants. Parkinson's patients performed better than the age-matched controls on almost all measures and as well as the young controls in many cases. However, the Parkinson's patients achieved this by paying relatively less attention to the secondary task and focusing attention more on the primary task. Thus, Parkinson's patients can apparently improve their performance on some aspects of a multidimensional task by simplifying task demands. This benefit may occur as a consequence of their inflexible exaggerated attention to some aspects of a complex task to the relative neglect of other aspects.
Conservation Education Timber Management Wildland Fire & Aviation Burn Permits Firewise Alaska Brochure (PDF) Fire Management Plans Fire Assignments Annual Fire Statistics Fire Terms Glossary Incident Business Management Grants Become an Alaska Firewise Community Community Wildland Fire Protection Plans
Major Events Leading to Establishment of The National Task Bank.
ERIC Educational Resources Information Center
Upjohn (W.E.) Inst. for Employment Research, Washington, DC.
This document describes how the plan for a National Task Bank evolved as part of an effort to encourage State and local public welfare agencies to adopt new approaches to staff planning and utilization. The task bank is an outgrowth of the application of systems approach and functional job analysis to agency management. Individualized data banks…
How To Build a Strategic Plan: A Step-by-Step Guide for School Managers.
ERIC Educational Resources Information Center
Clay, Katherine; And Others
Strategic planning techniques for administrators, with a focus on process managers, are presented in this guidebook. The three major tasks of the strategic planning process include the assessment of the current organizational situation, goal setting, and the development of strategies to accomplish this. Strategic planning differs from long-range…
Next-generation simulation and optimization platform for forest management and analysis
Antti Makinen; Jouni Kalliovirta; Jussi Rasinmaki
2009-01-01
Late developments in the objectives and the data collection methods of forestry create new challenges and possibilities in forest management planning. Tools in forest management and forest planning systems must be able to make good use of novel data sources, use new models, and solve complex forest planning tasks at different scales. The SIMulation and Optimization (...
China Report, Economic Affairs
1987-01-28
further that while relaxing control over the microeconomy , we must make corresponding improvements in the work of planned management and stretigthen...borne out by practice that in the course of reforming the economic structure, it is necessary to further invigorate the microeconomy while...the microeconomy . This is the current new task for planned management. The establishment of a new system of planned management that suits the commodity
Case Management: Let Us Count the Ways.
ERIC Educational Resources Information Center
Austin, Carol D.
Case management as implemented in programs for the elderly, has focused on interactions between the client and case manager in the areas of assessment, care planning, service plan implementation, and follow-up. Variation in these case management tasks suggests that no single model can be implemented in all local delivery systems. This emphasis on…
Using principles from emergency management to improve emergency response plans for research animals.
Vogelweid, Catherine M
2013-10-01
Animal research regulatory agencies have issued updated requirements for emergency response planning by regulated research institutions. A thorough emergency response plan is an essential component of an institution's animal care and use program, but developing an effective plan can be a daunting task. The author provides basic information drawn from the field of emergency management about best practices for developing emergency response plans. Planners should use the basic principles of emergency management to develop a common-sense approach to managing emergencies in their facilities.
SmartStaff: A Support Concept for Staff Planning
2000-11-01
facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff
ERIC Educational Resources Information Center
Doyle, Walter; And Others
This report describes the conceptual background, design, and methodology for a study of management of academic tasks in junior high school. Previous research suggests that tasks students accomplish in classrooms determine what they actually learn, and acquisition of higher cognitive skills related to interpretation and planning is essential for…
Water Management Plan for Fort Buchanan, Puerto Rico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chvala, William D.; Sullivan, Gregory P.; Mcmordie, Katherine
2004-06-01
This document reports findings and recommendations as a result of a design assistance project with Fort Buchanan with the goals of developing a Water Management Plan (WMP). The WRMP developed during this task is an amalgam of the templates and guidelines from the Federal Energy Management Program and Army regulations.
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
Appendix X. ComField Information Management System.
ERIC Educational Resources Information Center
Coffin, Robert W.
This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2011 CFR
2011-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2012 CFR
2012-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
33 CFR 385.11 - Implementation process for projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...
Applicability Evaluation of Job Standards for Diabetes Nutritional Management by Clinical Dietitian.
Baek, Young Jin; Oh, Na Gyeong; Sohn, Cheong-Min; Woo, Mi-Hye; Lee, Seung Min; Ju, Dal Lae; Seo, Jung-Sook
2017-04-01
This study was conducted to evaluate applicability of job standards for diabetes nutrition management by hospital clinical dietitians. In order to promote the clinical nutrition services, it is necessary to present job standards of clinical dietitian and to actively apply these standardized tasks to the medical institution sites. The job standard of clinical dietitians for diabetic nutrition management was distributed to hospitals over 300 beds. Questionnaire was collected from 96 clinical dietitians of 40 tertiary hospitals, 47 general hospitals, and 9 hospitals. Based on each 5-point scale, the importance of overall duty was 4.4 ± 0.5, performance was 3.6 ± 0.8, and difficulty was 3.1 ± 0.7. 'Nutrition intervention' was 4.5 ± 0.5 for task importance, 'nutrition assessment' was 4.0 ± 0.7 for performance, and 'nutrition diagnosis' was 3.4 ± 0.9 for difficulty. These 3 items were high in each category. Based on the grid diagram, the tasks of both high importance and high performance were 'checking basic information,' 'checking medical history and therapy plan,' 'decision of nutritional needs,' 'supply of foods and nutrients,' and 'education of nutrition and self-management.' The tasks with high importance but low performance were 'derivation of nutrition diagnosis,' 'planning of nutrition intervention,' 'monitoring of nutrition intervention process.' The tasks of both high importance and high difficulty were 'derivation of nutrition diagnosis,' 'planning of nutrition intervention,' 'supply of foods and nutrients,' 'education of nutrition and self-management,' and 'monitoring of nutrition intervention process.' The tasks of both high performance and high difficulty were 'documentation of nutrition assessment,' 'supply of foods and nutrients,' and 'education of nutrition and self-management.'
[New professional field in France: Analysis of the training needs of case managers].
Somme, Dominique; Corvol, Aline; Couturier, Yves; Pimouguet, Clément; Moreau, Olivier; Perivier, Samuel; Balard, Frédéric; de Stampa, Matthieu
2015-01-01
Case management is a relatively new career field in France. It was first introduced on an experimental basis in 2007-2008, and was then developedfollowing the National Alzheimer Plan and finally enshrined in legislation in 2012. This careerfield is based on a set of tasks widely described internationally: identifying the right level of intervention, standardized multidimensional assessment, planning all aid (care and social services), implementation of the plan, monitoring and reassessment and periodic reassessment of all needs in a continuous and long-term process. The specific, systematic and dedicated nature of these tasks to these tasks makes training essential. Regulations also stipulate that the professional must acquire additional training by a dedicated inter-university degree. This requirement is a French specificity The authors present the history of case management and training in France and analyze the various international training frameworks identified by an Internet search. Moreover, based on the opinions expressed by case managers at different times of the scientific assessment and a review ofseveral studies conducted by inter-university case management program students, this article highlights the specific training needs of case managers and how the proposed training can meet these needs.
Task-level control for autonomous robots
NASA Technical Reports Server (NTRS)
Simmons, Reid
1994-01-01
Task-level control refers to the integration and coordination of planning, perception, and real-time control to achieve given high-level goals. Autonomous mobile robots need task-level control to effectively achieve complex tasks in uncertain, dynamic environments. This paper describes the Task Control Architecture (TCA), an implemented system that provides commonly needed constructs for task-level control. Facilities provided by TCA include distributed communication, task decomposition and sequencing, resource management, monitoring and exception handling. TCA supports a design methodology in which robot systems are developed incrementally, starting first with deliberative plans that work in nominal situations, and then layering them with reactive behaviors that monitor plan execution and handle exceptions. To further support this approach, design and analysis tools are under development to provide ways of graphically viewing the system and validating its behavior.
Autonomous mission management for UAVs using soar intelligent agents
NASA Astrophysics Data System (ADS)
Gunetti, Paolo; Thompson, Haydn; Dodd, Tony
2013-05-01
State-of-the-art unmanned aerial vehicles (UAVs) are typically able to autonomously execute a pre-planned mission. However, UAVs usually fly in a very dynamic environment which requires dynamic changes to the flight plan; this mission management activity is usually tasked to human supervision. Within this article, a software system that autonomously accomplishes the mission management task for a UAV will be proposed. The system is based on a set of theoretical concepts which allow the description of a flight plan and implemented using a combination of Soar intelligent agents and traditional control techniques. The system is capable of automatically generating and then executing an entire flight plan after being assigned a set of objectives. This article thoroughly describes all system components and then presents the results of tests that were executed using a realistic simulation environment.
NASA Technical Reports Server (NTRS)
Yao, S. S. (Principal Investigator)
1981-01-01
The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.
DOT National Transportation Integrated Search
1981-06-01
The purpose of Task 5 in the Extended System Operations Studies Project, DPM Failure Management, is to enhance the capabilities of the Downtown People Mover Simulation (DPMS) and the Discrete Event Simulation Model (DESM) by increasing the failure mo...
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
A transportation-scheduling system for managing silvicultural projects
Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald
2005-01-01
A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
DOT National Transportation Integrated Search
1998-10-11
This paper describes a preliminary cognitive task analysis (CTA) that is being conducted to examine how experienced train dispatchers manage and schedule trains. The CTA uses ethnographic field observations and structured interview techniques. The ob...
The Battlefield Commander’s Assistant Project: Research in Terrain Reasoning
1987-05-22
order dissemination. In order to restrict the survey problem to a manageable level, we made the a priori decision to focus on activities related to...models Manages tools for: Conmander , tactical a explanations * situation assessment1Lplans s plan and plan option " a query/edit capabilities...from our work on the Air Land Battle Management Study ( ’Stachnick 87:) which was tasked to compare Al planning techniques with the requirements of
ERIC Educational Resources Information Center
Noll, Gayle
In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…
The Surinamese Ministry of Physical Planning, Land and Forest Management (De minister van Ruimtelijke ordening, Grond- en Bosbeheer (Ministry RGB)) is tasked with a wide range of critical environmental duties. This ministry is responsible for monitoring and protecting federally ...
MSFC personnel management tasks: Recruitment and orientation of new employees
NASA Technical Reports Server (NTRS)
Brindley, T. A.
1980-01-01
In order to encourage highly motivated young students to learn about NASA and consider it for a career, a formal program is to be initiated whereby selected students can work on a voluntary basis at Marshall Space Flight Center (MSFC). The first task was to develop the working plan and procedures for this program, called Student Volunteer Service Program, in the writing of MSFC official guidelines, the Marshall Management Instruction (the MMI) which is a binding document that defines policy and establishes procedures and guidelines. Particular considerations written into the MMI after numerous consultations, interviews, and discussions about a satisfactory policy, include: arrangements to be made between the student, the school authorities, and concerned MSFC employees; management of the work assignments; and procedures for the student's welfare and safety. The second task was the development of a recruitment brochure for the attraction of new employees, especially scientists and engineers. The third task assigned was to develop a plan called Orientation of New Employees.
Applicability Evaluation of Job Standards for Diabetes Nutritional Management by Clinical Dietitian
2017-01-01
This study was conducted to evaluate applicability of job standards for diabetes nutrition management by hospital clinical dietitians. In order to promote the clinical nutrition services, it is necessary to present job standards of clinical dietitian and to actively apply these standardized tasks to the medical institution sites. The job standard of clinical dietitians for diabetic nutrition management was distributed to hospitals over 300 beds. Questionnaire was collected from 96 clinical dietitians of 40 tertiary hospitals, 47 general hospitals, and 9 hospitals. Based on each 5-point scale, the importance of overall duty was 4.4 ± 0.5, performance was 3.6 ± 0.8, and difficulty was 3.1 ± 0.7. ‘Nutrition intervention’ was 4.5 ± 0.5 for task importance, ‘nutrition assessment’ was 4.0 ± 0.7 for performance, and ‘nutrition diagnosis’ was 3.4 ± 0.9 for difficulty. These 3 items were high in each category. Based on the grid diagram, the tasks of both high importance and high performance were ‘checking basic information,’ ‘checking medical history and therapy plan,’ ‘decision of nutritional needs,’ ‘supply of foods and nutrients,’ and ‘education of nutrition and self-management.’ The tasks with high importance but low performance were ‘derivation of nutrition diagnosis,’ ‘planning of nutrition intervention,’ ‘monitoring of nutrition intervention process.’ The tasks of both high importance and high difficulty were ‘derivation of nutrition diagnosis,’ ‘planning of nutrition intervention,’ ‘supply of foods and nutrients,’ ‘education of nutrition and self-management,’ and ‘monitoring of nutrition intervention process.’ The tasks of both high performance and high difficulty were ‘documentation of nutrition assessment,’ ‘supply of foods and nutrients,’ and ‘education of nutrition and self-management.’ PMID:28503506
NASA Technical Reports Server (NTRS)
Vairo, Daniel M.
1998-01-01
The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.
Air Force Geophysics Laboratory Management Information System Study.
1985-11-01
management information system (MIS) at AFGL. The study summarizes current management and administrative practices at AFGL. Requirements have been identified for automating several currently manual functions to compile accurate and timely information to better manage and plan AFGL programs. This document describes the functions and relative priorities of five MIS subsystems and provides suggestions for implementation solutions. Creation of a detailed Development Plan is recommended as the follow-on task.
Becoming an effective clinical engineering or biomedical technology manager.
Brush, L C
1992-01-01
The BMET or CE Supervisor is a technical manager who is close to the actual work of a biomedical or clinical engineering department. The MPTI is a management training tool that has identified differences between the effective and less-effective technical managers. These behaviors or styles can be considered and applied to the clinical engineering and BMET work environments. Effective BMET or CE Supervisors have a management identity. They are both people-oriented and task-oriented. They are good problem-solvers, and will plan and structure the work tasks and environment. When the situation requires a change in plans, however, they can adapt to the new situation easily. If a decision needs to be made that affects the organization, they will check with higher management or peer managers. Less-effective BMET or CE Supervisors will make important decisions alone, without checking with others. They plan and structure tasks and the work environment, but they are less willing to change when faced with a new situation. They are not people-oriented, and their ability to assess social situations is low. Their need for achievement recognition is often too high. The work environment has an effect on how the competence of a manager is perceived. A "one-desk manager" in a small, one-person biomedical engineering department has more autonomy than a CE Supervisor in a large department. Working for a medical device manufacturing firm often requires a greater management identity. An engineering consultant is often a managing specialist, rather than a traditional manager.(ABSTRACT TRUNCATED AT 250 WORDS)
NASA Technical Reports Server (NTRS)
Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)
2009-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.
ERIC Educational Resources Information Center
Handy, Alice Evans; Yucht, Alice H.
1993-01-01
Includes two articles that discuss time management and mail management strategies for librarians. Highlights include identifying personal work styles; planning and prioritizing; using calendars and computers; reexamining traffic patterns; delegating; and sorting and handling mail. (Contains eight references.) (LRW)
Long Range Planning for Computer Use--A Task Force Model.
ERIC Educational Resources Information Center
Raucher, S. M.; Koehler, T. J.
A Management Operations Review and Evaluation (MORE) study of the Department of Management Information and Computer Services, which was completed in the fall of 1980, strongly recommended that the Montgomery County Public Schools (MCPS) develop a long-range plan to meet the computer needs of schools and central offices. In response to this…
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Automating a Detailed Cognitive Task Analysis for Structuring Curriculum
1991-08-01
1991-- ] Aleeo/i ISM’-19# l Title: Automating a Detailed Cognitive Task Analysis for Structuring Curriculum Activities: To date we have completed task...The Institute for Management Sciences. Although the particular application of the modified GOMS cognitive task analysis technique under development is...Laboratories 91 9 23 074 Automnating a Detailed Cognitive Task Analysis For Stucuring Curriculum Research Plan Year 1 Task 1.0 Design Task 1.1 Conduct body
Commonwealth of the Northern Mariana Islands Energy Action Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, M. D.; Ness, J. E.
2013-07-01
This document describes the three near-term energy strategies selected by the CNMI Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. The three energy strategies selected by the task force are (1) designing a demand-side management program focusing on utility, residential and commercial sectors, (2) developing an outreach and education plan focused on energy conservation in government agencies and businesses, including workplace rules, and (3) exploring waste-to-energy options. The task force also discussed several other medium- and long-term energy strategies that could be explored at a future date.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Usage Analysis of a Shared Care Planning System
Warren, Jim; Gu, Yulong; Humphrey, Gayl
2012-01-01
We examined the content of electronically mediated communications in a trial of shared care planning (SCP) for long-term condition management. Software supports SCP by sharing patient records and care plans among members of the multidisciplinary care team (with patient access). Our analysis focuses on a three-month period with 73 enrolled patients, 149 provider-assigned tasks, 64 clinical notes and 48 care plans with 162 plan elements. Results show that content of notes entries is often related to task assignment and that nurses are the most active users. Directions for refinement of the SCP technology are indicated, including better integration of notes, tasks and care team notifications, as well as the central role of nurses for design use cases. Broader issues are raised about workforce roles and responsibilities for SCP, integrating patient-provider and provider-provider communications, and the centrality of care plans as the key entity in mediation of the care team. PMID:23304370
Josh Hyde; Eva K. Strand; Andrew T. Hudak; Dale Hamilton
2015-01-01
The use of fire as a land management tool is well recognized for its ecological benefits in many natural systems. To continue to use fire while complying with air quality regulations, land managers are often tasked with modeling emissions from fire during the planning process. To populate such models, the Landscape Fire and Resource Management Planning Tools (...
Life Sciences Research Facility automation requirements and concepts for the Space Station
NASA Technical Reports Server (NTRS)
Rasmussen, Daryl N.
1986-01-01
An evaluation is made of the methods and preliminary results of a study on prospects for the automation of the NASA Space Station's Life Sciences Research Facility. In order to remain within current Space Station resource allocations, approximately 85 percent of planned life science experiment tasks must be automated; these tasks encompass specimen care and feeding, cage and instrument cleaning, data acquisition and control, sample analysis, waste management, instrument calibration, materials inventory and management, and janitorial work. Task automation will free crews for specimen manipulation, tissue sampling, data interpretation and communication with ground controllers, and experiment management.
DOT National Transportation Integrated Search
2006-02-06
for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed as a result of extensive and methodical pre-planning. This approach, however, does not adequately s...
Data Science in Supply Chain Management: Data-Related Influences on Demand Planning
ERIC Educational Resources Information Center
Jin, Yao
2013-01-01
Data-driven decisions have become an important aspect of supply chain management. Demand planners are tasked with analyzing volumes of data that are being collected at a torrential pace from myriad sources in order to translate them into actionable business intelligence. In particular, demand volatilities and planning are vital for effective and…
KCBX Quality Assurance Project Plan - October 2014
This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.
KCBX Quality Assurance Project Plan - February 2014
This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.
Levaux, M.-N.; Larøi, F.; Malmedier, M.; Offerlin-Meyer, I.; Danion, J.-M.; Van der Linden, M.
2012-01-01
The aim was to assess the efficacy of a modified version of Goal Management Training (GMT) in a person with schizophrenia who had difficulties in attaining the final goal for new and multitasking daily-life situations. GMT is designed to improve abilities in establishing goal-directed plans and carrying them out effectively. Beneficial effects of GMT were measured for several clinical questionnaires, laboratory tasks, and three real-life situations: meal preparation (trained, familiar); washing (nontrained, familiar); meeting preparation (nontrained, unfamiliar). The results revealed improvement in planning and on trained laboratory and meal preparation tasks and a generalization of GMT effects on nontrained laboratory and everyday tasks. Self-esteem also improved. Finally, a two-year followup indicated the durability of the beneficial effects. PMID:23094177
LANL surveillance requirements management and surveillance requirements from NA-12 tasking memo
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hills, Charles R
2011-01-25
Surveillance briefing to NNSA to support a tasking memo from NA-12 on Surveillance requirements. This talk presents the process for developing surveillance requirements, discusses the LANL requirements that were issued as part of that tasking memo, and presents recommendations on Component Evaluation and Planning Committee activities for FY11.
SUMO: operation and maintenance management web tool for astronomical observatories
NASA Astrophysics Data System (ADS)
Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa
2014-08-01
SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.
Lee, Youngjin; Choo, Jina; Cho, Jeonghyun; Kim, So-Nam; Lee, Hye-Eun; Yoon, Seok-Jun; Seomun, GyeongAe
2014-03-01
This study aimed to develop a job description for healthcare managers of metabolic syndrome management programs using task analysis. Exploratory research was performed by using the Developing a Curriculum method, the Intervention Wheel model, and focus group discussions. Subsequently, we conducted a survey of 215 healthcare workers from 25 community health centers to verify that the job description we created was accurate. We defined the role of healthcare managers. Next, we elucidated the tasks of healthcare managers and performed needs analysis to examine the frequency, importance, and difficulty of each of their duties. Finally, we verified that our job description was accurate. Based on the 8 duties, 30 tasks, and 44 task elements assigned to healthcare managers, we found that the healthcare managers functioned both as team coordinators responsible for providing multidisciplinary health services and nurse specialists providing health promotion services. In terms of importance and difficulty of tasks performed by the healthcare managers, which were measured using a determinant coefficient, the highest-ranked task was planning social marketing (15.4), while the lowest-ranked task was managing human resources (9.9). A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs. Copyright © 2014. Published by Elsevier B.V.
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
Siirala, Eriikka; Peltonen, Laura-Maria; Lundgrén-Laine, Heljä; Salanterä, Sanna; Junttila, Kristiina
2016-09-01
To describe the tactical and the operational decisions made by nurse managers when managing the daily unit operation in peri-operative settings. Management is challenging as situations change rapidly and decisions are constantly made. Understanding decision-making in this complex environment helps to develop decision support systems to support nurse managers' operative and tactical decision-making. Descriptive cross-sectional design. Data were collected from 20 nurse managers with the think-aloud method during the busiest working hours and analysed using thematic content analysis. Nurse managers made over 700 decisions; either ad hoc (n = 289), near future (n = 268) or long-term (n = 187) by nature. Decisions were often made simultaneously with many interruptions. Ad hoc decisions covered staff allocation, ensuring adequate staff, rescheduling surgical procedures, confirmation tangible resources and following-up the daily unit operation. Decisions in the near future were: planning of surgical procedures and tangible resources, and planning staff allocation. Long-term decisions were: human recourses, nursing development, supplies and equipment, and finances in the unit. Decision-making was vulnerable to interruptions, which sometimes complicated the managing tasks. The results can be used when planning decision support systems and when defining the nurse managers' tasks in peri-operative settings. © 2016 John Wiley & Sons Ltd.
76 FR 5141 - Pacific Fishery Management Council (Council); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-28
... Fishery Management Council (Council); Public Meeting AGENCY: National Marine Fisheries Service (NMFS.... SUMMARY: The Pacific Fishery Management Council (Pacific Council) will convene a meeting of the Ecosystem... Fishery Management Plan (EFMP). At the September 2010 Council meeting, the Council tasked the EPDT with a...
Planning for Applications of Communications Satellites in Education.
ERIC Educational Resources Information Center
O'Connell, William K.
This report of a project to develop and test a prototype system for the delivery of continuing education (CE) to two defined target groups of registered dietitians includes user needs, alternative approaches, the operational plan, the management plan, and personnel. Major tasks involved in the project are described: (1) development,…
Design of an ecological monitoring strategy for the Forest Plan in the Pacific Northwest
Paul L. Ringold; Barry Mulder; Jim Alegria; Raymond L. Czaplewski; Tim Tolle; Kelly Burnett
2003-01-01
The growing literature on ecosystem management describes an adaptive system in which monitoring measures progress toward goals, increases our knowledge, and improves our plans (e.g., Holling 1978; Walters 1986; Duffus III 1994; Everett et al. 1994; Grumbine 1994; Bormann et al. 1995; Gunderson et al. 1995; Interagency Ecosystem Management Task Force 1995; Montgomery et...
Development of a Space Station Operations Management System
NASA Technical Reports Server (NTRS)
Brandli, A. E.; Mccandless, W. T.
1988-01-01
To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.
Development of a Space Station Operations Management System
NASA Astrophysics Data System (ADS)
Brandli, A. E.; McCandless, W. T.
To enhance the productivity of operations aboard the Space Station, a means must be provided to augment, and frequently to supplant, human effort in support of mission operations and management, both on the ground and onboard. The Operations Management System (OMS), under development at the Johnson Space Center, is one such means. OMS comprises the tools and procedures to facilitate automation of station monitoring, control, and mission planning tasks. OMS mechanizes, and hence rationalizes, execution of tasks traditionally performed by mission planners, the mission control center team, onboard System Management software, and the flight crew.
NASA Technical Reports Server (NTRS)
Ebersole, M. M.
1983-01-01
JPL's management and administrative support systems have been developed piece meal and without consistency in design approach over the past twenty years. These systems are now proving to be inadequate to support effective management of tasks and administration of the Laboratory. New approaches are needed. Modern database management technology has the potential for providing the foundation for more effective administrative tools for JPL managers and administrators. Plans for upgrading JPL's management and administrative systems over a six year period evolving around the development of an integrated management and administrative data base are discussed.
ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks
NASA Technical Reports Server (NTRS)
Hall, Timothy A.
2011-01-01
In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow, archiving f data, and generating console logs. This technology called OCAMS (OCA (Orbital Communication System) Management System), is now considered TRL level 9 and is in daily use in the Mission Control Center in support of ISS operations. These solutions have not only allowed for improved efficiency on console; but since many of the previously manual data transfers are now automated, many of the human error prone steps have been removed, and the quality of the planning products has improved tremendously. This has also allowed our Planning Flight Controllers more time to focus on the abstract areas of the job, (like the complexities of planning a mission for 6 international crew members with a global planning team), instead of being burdened with the administrative tasks that took significant time each console shift to process. The resulting automation solutions have allowed the Operations and Planning organization to realize significant cost savings for the ISS program through 2020 and many of these solutions could be a viable
Training Packages: The Scientific Management of Education.
ERIC Educational Resources Information Center
Hunter, John
The theory of scientific management was established as a way to increase workers' productivity. The following are among the key principles underpinning scientific management: task simplification and division of labor boost productivity; management must control the planning of work down to its minutiae; and remuneration should be based on output.…
Allocating time to future tasks: the effect of task segmentation on planning fallacy bias.
Forsyth, Darryl K; Burt, Christopher D B
2008-06-01
The scheduling component of the time management process was used as a "paradigm" to investigate the allocation of time to future tasks. In three experiments, we compared task time allocation for a single task with the summed time allocations given for each subtask that made up the single task. In all three, we found that allocated time for a single task was significantly smaller than the summed time allocated to the individual subtasks. We refer to this as the segmentation effect. In Experiment 3, we asked participants to give estimates by placing a mark on a time line, and found that giving time allocations in the form of rounded close approximations probably does not account for the segmentation effect. We discuss the results in relation to the basic processes used to allocate time to future tasks and the means by which planning fallacy bias might be reduced.
NASA Technical Reports Server (NTRS)
Gallagher, Seana; Olson, Matt; Blythe, Doug; Heletz, Jacob; Hamilton, Griff; Kolb, Bill; Homans, Al; Zemrowski, Ken; Decker, Steve; Tegge, Cindy
2000-01-01
This document is the NASA AATT Task Order 24 Final Report. NASA Research Task Order 24 calls for the development of eleven distinct task reports. Each task was a necessary exercise in the development of comprehensive communications systems architecture (CSA) for air traffic management and aviation weather information dissemination for 2015, the definition of the interim architecture for 2007, and the transition plan to achieve the desired End State. The eleven tasks are summarized along with the associated Task Order reference. The output of each task was an individual task report. The task reports that make up the main body of this document include Task 5, Task 6, Task 7, Task 8, Task 10, and Task 11. The other tasks provide the supporting detail used in the development of the architecture. These reports are included in the appendices. The detailed user needs, functional communications requirements and engineering requirements associated with Tasks 1, 2, and 3 have been put into a relational database and are provided electronically.
1991-02-01
theory orients command leadership for the enormous task of managing organizations in our environment fraught with volatility, uncertainty...performance and organizational ethics. A THEORY OF MANAGEMENT BACKGROUND BASIC MANAGEMENT BEHAVIORAL Definitions FUNCTIONS ASPECTS History Planning Leadership ...the best way to manage in their theory of managerial leadership . To them, the 9,9 position on their model, "is acknowledged by managers as the
Grant, Michele; Ponsford, Jennie; Bennett, Pauleen C
2012-01-01
Executive functions encompass planning, problem-solving and self-monitoring abilities, abilities that are implicit in goal attainment and often compromised in individuals with traumatic brain injury (TBI). Goal Management Training (GMT) is a theoretically based rehabilitation protocol that was developed to improve goal-directed behaviour. To date, there is evidence to support the efficacy of GMT in healthy older adults and in one previously high functioning individual with acquired brain injury. However, there is no evidence that, in individuals with TBI and severe cognitive impairments, GMT leads to sustained improvement on everyday tasks requiring planning and organisation. The current study was conducted to explore the efficacy of GMT in helping individuals with TBI to improve aspects of their day-to-day financial management. Four participants with severe TBI completed a modified GMT module. Outcomes were assessed using Goal Attainment Scaling. Five control participants were also recruited as a comparison group for the Multiple Errands Task which was used to measure generalisation. The outcomes in each case were variable. Overall the results showed that the structured GMT intervention assisted some TBI individuals to improve their performance on financial management tasks, with evidence of generalisation in some cases.
Asthma management self-efficacy in parents of primary school-age children.
Brown, Nicola; Gallagher, Robyn; Fowler, Cathrine; Wales, Sandra
2014-06-01
The aim of this study was to investigate asthma management self-efficacy in parents of primary school-age children with asthma and to explore possible associations between parent asthma management self-efficacy, parent and child characteristics, asthma task difficulty and asthma management responsibility. A cross-sectional descriptive survey of 113 parents was conducted to assess the level of parent asthma management self-efficacy, asthma task difficulty and confidence, asthma responsibility and socio-demographic characteristics. The findings indicate that parents had higher self-efficacy for attack prevention than attack management. Parents had higher self-efficacy for asthma management tasks that are simple, skills based and performed frequently such as medication administration and less confidence and greater difficulty with tasks associated with judgement and decision-making. Multivariate linear regression analysis identified English language, child asthma responsibility and parent education as predictors of higher asthma management self-efficacy, while an older child was associated with lower parent asthma management self-efficacy. The implications of these results for planning and targeting health education and self-management interventions for parents and children are discussed. © The Author(s) 2013.
33 CFR 385.30 - Master Implementation Sequencing Plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... projects of the Plan, including pilot projects and operational elements, based on the best scientific... Florida Water Management District shall also consult with the South Florida Ecosystem Restoration Task...; (ii) Information obtained from pilot projects; (iii) Updated funding information; (iv) Approved...
Education for All: National Plan of Action, 2003-2015
ERIC Educational Resources Information Center
Online Submission, 2005
2005-01-01
Background: The Lao People's Democratic Republic (PDR) Education for All National Plan of Action (EFA NPA) for 2003-2015 seeks to accomplish three major tasks: equitable access, improved quality and relevance and strengthened education management. Purpose: To design a National Education For All Action Plan for basic education in Lao PDR which…
Developing an effective business plan.
Lehman, L B
1996-06-01
At some time, virtually all managed care executives, and most physician executives, will be asked to develop business plans. Business plans are thoughtful, comprehensive, and realistic descriptions of the many aspects of the formulation of a new business product or line for market. The author describes what goes into the writing of a business plan and how the physician executive should approach this task.
1989-07-01
incorporated into the sys- Kotler88 tem. Several interesting concepts are presented, but Kotler , P. Marketing Planning: Analysis, Planning, the bulk of the...Metzger87 Mantei, M. "The Effect of Programming Team Metzger, Philip W. Managing Programming Structures on Programming Tasks." Comm. ACM People: A Personal... Philips . Software Engi- Classic approach in organization theory. neering. Englewood Cliffs, N.J.: Prentice-Hall, 1988. Shannon75 An industrial approach
Barrier Beach Breaching from the Lagoon Side, With Reference to Northern California
2008-01-01
northwest of San Francisco in Sonoma County . Near the mouth of the Russian River, the coast is punctuated by small pocket beaches separating steep...management plan.” Prepared for U.S. Army Corps of Engineers, San Fran- cisco District and Sonoma County Water Agency, Walnut Creek, CA, 50 p. Goodwin, P...Planning Sonoma County and California Coastal Con- servancy under the direction of the Russian River Estuary Task Interagency Task Force. Phillip
Planning the FUSE Mission Using the SOVA Algorithm
NASA Technical Reports Server (NTRS)
Lanzi, James; Heatwole, Scott; Ward, Philip R.; Civeit, Thomas; Calvani, Humberto; Kruk, Jeffrey W.; Suchkov, Anatoly
2011-01-01
Three documents discuss the Sustainable Objective Valuation and Attainability (SOVA) algorithm and software as used to plan tasks (principally, scientific observations and associated maneuvers) for the Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. SOVA is a means of managing risk in a complex system, based on a concept of computing the expected return value of a candidate ordered set of tasks as a product of pre-assigned task values and assessments of attainability made against qualitatively defined strategic objectives. For the FUSE mission, SOVA autonomously assembles a week-long schedule of target observations and associated maneuvers so as to maximize the expected scientific return value while keeping the satellite stable, managing the angular momentum of spacecraft attitude- control reaction wheels, and striving for other strategic objectives. A six-degree-of-freedom model of the spacecraft is used in simulating the tasks, and the attainability of a task is calculated at each step by use of strategic objectives as defined by use of fuzzy inference systems. SOVA utilizes a variant of a graph-search algorithm known as the A* search algorithm to assemble the tasks into a week-long target schedule, using the expected scientific return value to guide the search.
Managing the "Performance" in Performance Management.
ERIC Educational Resources Information Center
Repinski, Marilyn; Bartsch, Maryjo
1996-01-01
Describes a five-step approach to performance management which includes (1) redefining tasks; (2) identifying skills; (3) determining what development tools are necessary; (4) prioritizing skills development; and (5) developing an action plan. Presents a hiring model that includes job analysis, job description, selection, goal setting, evaluation,…
A Management Information Systems Needs Analysis for the University of Nevada Reno.
ERIC Educational Resources Information Center
Nevada Univ., Reno.
Results of a needs assessment for administrative computing at the University of Nevada, Reno, are presented. The objectives of the Management Information Systems Task Force are identified, along with 17 problems in existing operational and management data systems, and institutional goals for future planning and management systems. In addition to…
Why are You Late?: Investigating the Role of Time Management in Time-Based Prospective Memory
Waldum, Emily R; McDaniel, Mark A.
2016-01-01
Time-based prospective memory tasks (TBPM) are those that are to be performed at a specific future time. Contrary to typical laboratory TBPM tasks (e.g., “hit the “z” key every 5 minutes”), many real-world TBPM tasks require more complex time-management processes. For instance to attend an appointment on time, one must estimate the duration of the drive to the appointment and then utilize this estimate to create and execute a secondary TBPM intention (e.g., “I need to start driving by 1:30 to make my 2:00 appointment on time”). Future under- and overestimates of drive time can lead to inefficient TBPM performance with the former lending to missed appointments and the latter to long stints in the waiting room. Despite the common occurrence of complex TBPM tasks in everyday life, to date, no studies have investigated how components of time management, including time estimation, affect behavior in such complex TBPM tasks. Therefore, the current study aimed to investigate timing biases in both older and younger adults and further to determine how such biases along with additional time management components including planning and plan fidelity influence complex TBPM performance. Results suggest for the first time that younger and older adults do not always utilize similar timing strategies, and as a result, can produce differential timing biases under the exact same environmental conditions. These timing biases, in turn, play a vital role in how efficiently both younger and older adults perform a later TBPM task that requires them to utilize their earlier time estimate. PMID:27336325
Army Task Force on Behavioral Health: Corrective Action Plan
2013-01-01
Veterans Affairs Legal Section KNOWLEDGE MGMT SECTION • KMO • CAA Analyst Figure I-1. Task Force Organization. ACRONYM Key ASA(M&RA): Assistant...Army Audit Agency OTIG: Office of the Inspector General OTSG: Office of the Surgeon General KMO : Knowledge Management Officer CAA: Center for
75 FR 72863 - Motor Carrier Safety Advisory Committee Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-26
... MCSAC will complete action on Task 10-02, regarding Fatigue Management Plans for Commercial Motor Vehicle Drivers. Additionally, the MCSAC will commence work on Task 11-01, regarding Patterns of Safety... officer, safety director, vehicle maintenance supervisor, and driver supervisor of a motor carrier...
Planning and management of the Nido Reef Complex Oil Field development, Philippines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harry, R.Y.
1981-01-01
As Operator for the Northeast Palawan consortium, Philippines-Cities Service, Inc., commenced the Philippines first commercial offshore oil production from the Nido Reef Complex Oil Field on February 1, 1979, some 11 months after a decision by management to start development. The relative speed at which design, fabrication, and construction were accomplished is attributed to the use of the concepts of project planning, task force approach, and project management. This paper presents the above concepts as applied to the Nido Complex.
1978-10-01
Information ; Logistics Planning; Management Planning and Control; Management Information Systems; Management; Military Supplies; Acquisition; JO...Arlington, Virginia 22202 Contract DAHC 15-73C-0200 Task 78-II-1 CONTENTS GLOSSARY : v SUMMARY ix I. INTRODUCTION 1 II. MARINE CORPS SUPPORT OP...Materiel Command Navy Cost Information System/FYDP Subsystem Non-Industrial Fund Non-Telecommunications Offfice of the Assistant Secretary of Defense
Somme, Dominique; Hébert, Réjean; Bravo, Gina; Blanchard, François; Saint-Jean, Olivier
2007-01-01
Introduction One aspect of clinical integration involves case managers' tools and particularly the individualized service plan. Methods We examined individualized service plan content and use in the PRISMA experiment. We analyzed 50 charts, and conducted and recorded interviews regarding individualized service plan use with all the case managers concerned (n=13). Results Delays between starting case management and writing the individualized service plan were long and varied (0–596 days, mean: 117 days). During the interviews, the individualized service plan was described as the ‘last step’ once the active planning phase was over. The reasons for formulating plans were mainly administrative. From a clinical viewpoint, individualized service plans were used as memoranda and not to describe services (842 interventions not mentioned in the plans) or needs (694 active problems not mentioned). Case managers felt uncomfortable with the individualized planning task and expected a tool more adapted to their needs. Conclusion Although a majority of the case managers' charts contained an individualized service plan, implementation of this tool seems tenuous. Because of the discrepancy between the potential usefulness expected by case managers and their actual use, a working committee was created to develop proposals for modifying the instrument. PMID:19503736
Evacuation transportation management : task five : operational concept.
DOT National Transportation Integrated Search
2009-06-26
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Evacuation transportation management. Task five, Operational concept
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Infrastructure Task Force Tribal Solid Waste Management
These documents describe 1) issues to consider when planning and designing community engagement approaches for tribal integrated waste management programs and 2) a proposed approach to improve tribal open dumps data and solid waste projects, and 3) an MOU.
Summaries of Minnehaha Creek Watershed District Plans/Studies/Reports
2004-01-30
34+ Management of all wetland functional assessment data in a Microsoft Access© database "+ Development of a GIS wetland data management system "+ Recommendations...General Task B Design GIS -Based Decision Making Model: Scenario-Based $125,000 $125,000 Model of Landuse Hydro Data Monitoring Task C Water Quality...Landuse and Land cover data + Watershed GIS data layers + Flood Insurance Rate Maps + Proposed project locations + Stream miles, reaches and conditions
NASA Technical Reports Server (NTRS)
Murphy, M. R.
1980-01-01
A resource management approach to aircrew performance is defined and utilized in structuring an analysis of 84 exemplary incidents from the NASA Aviation Safety Reporting System. The distribution of enabling and associated (evolutionary) and recovery factors between and within five analytic categories suggests that resource management training be concentrated on: (1) interpersonal communications, with air traffic control information of major concern; (2) task management, mainly setting priorities and appropriately allocating tasks under varying workload levels; and (3) planning, coordination, and decisionmaking concerned with preventing and recovering from potentially unsafe situations in certain aircraft maneuvers.
Thermal management for high power space platform systems
NASA Technical Reports Server (NTRS)
Gualdoni, R. A.
1980-01-01
With future spacecraft power requirements expected to be in the order of 100 to 250 kilowatts and orbital lifetimes in the order of five to ten years, new approaches and concepts will be required that can efficiently and cost effectively provide the required heat rejection and temperature control capabilities. A plan was established to develop the commensurate technologies necessary for the thermal management of a high power space platform representative of future requirements and to achieve technology readiness by 1987. The approach taken in developing the program was to view the thermal requirements of the spacecraft as a spacecraft system rather than each as an isolated thermal problem. The program plan proposes 45 technology tasks required to achieve technology readiness. Of this total, 24 tasks were subsequently identified as being pacing technology tasks and were recommended for initiation in FY 1980 and FY 1981.
ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks
NASA Technical Reports Server (NTRS)
Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)
2011-01-01
In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.
1987-09-01
The AFV ACRMP is the Task Force Director’s (08) tool to manage command, control, communication (C3) automation system life cycle developments for the...responsibilities, development management, acquisition strategy, testing , life cycle support, technology assessment and work group relationships. ACRMP
Nursing and the Management Function.
ERIC Educational Resources Information Center
Sherman, V. Clayton
The report describes a study designed to analyze nurses' management duties and to identify their tasks in planning, organizing, staffing. leading, communication, decision making, and controlling. A total of 117 supervisory nurses and unit managers from four Western Michigan short-term general hospitals in the 410-540 bed range participated in the…
Planning actions in robot automated operations
NASA Technical Reports Server (NTRS)
Das, A.
1988-01-01
Action planning in robot automated operations requires intelligent task level programming. Invoking intelligence necessiates a typical blackboard based architecture, where, a plan is a vector between the start frame and the goal frame. This vector is composed of partially ordered bases. A partial ordering of bases presents good and bad sides in action planning. Partial ordering demands the use of a temporal data base management system.
Limits of acceptable change planning in the Selway-Bitterroot Wilderness: 1985 to 1997 (FIDL)
Dan Ritter
1997-01-01
In 1985 the Forest Supervisors and staff of the Bitterroot, Clearwater, and Nez Perce National Forests met and agreed to an action plan for implementing a Limits of Acceptable Change (LAC) planning process for the Selway-Bitterroot Wilderness (SBW). The process, which was to include a citizens task force, was to produce a completed management plan in 2 years. Eight...
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Smith, Kevin J.
1988-01-01
This paper addresses the development of new planning methodologies which will evolve to serve the Space Station Freedom program; these planning processes will focus on the complex task of effectively managing the resources provided by the Space Station Freedom and will be made available to the diverse international community of space station users in support of their ongoing investigative activities.
The Use of Avian Focal Species for Conservation Planning in California
Mary K. Chase; Geoffrey R. Geupel
2005-01-01
Conservationists often try to facilitate the complex task of protecting biological diversity by choosing a subset of species from a larger community to help them plan their conservation objectives. Biological knowledge about these species then is used to plan reserve systems or to guide habitat restoration and management efforts, with the assumption that the...
Identification of Tasks in Home Economics Related Occupations: Food Service.
ERIC Educational Resources Information Center
Iowa State Univ. of Science and Technology, Ames. Dept. of Home Economics Education.
The study was made to obtain curriculum development data for food service education programs below the baccalaureate level. Tasks related to the job functions of service, production, sanitation/safety, menu planning, procurement, supervision, and management were studied for five job categories of full-time personnel: middle-level service,…
77 FR 66077 - Notice of ACHP Quarterly Business Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-01
... Credits B. Rightsizing Task Force Report C. Sustainability Task Force Report D. ACHP Plan in Response to... a.m. I. Chairman's Welcome II. Chairman's Award III. Chairman's Report IV. ACHP Management Issues A. ACHP FY 2013 and 2014 Budget B. Alumni Foundation Report C. Credentials Committee Review of Designee...
Integrated corridor management I-15 San Diego, California : analysis plan.
DOT National Transportation Integrated Search
2010-02-01
This AMS Analysis Plan for the I-15 Corridor outlines the various tasks associated with the application of the ICM AMS tools and strategies to this corridor in order to support benefit-cost assessment for the successful implementation of ICM. The rep...
Evacuation transportation management : task four: interview and survey results.
DOT National Transportation Integrated Search
2006-06-26
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Evacuation transportation management. Task four, Interview and survey results
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan
NASA Technical Reports Server (NTRS)
Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.
1981-01-01
The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.
Production practices affecting worker task demands in concrete operations: A case study.
Memarian, Babak; Mitropoulos, Panagiotis
2015-01-01
Construction work involves significant physical, mental, and temporal task demands. Excessive task demands can have negative consequences for safety, errors and production. This exploratory study investigates the magnitude and sources of task demands on a concrete operation, and examines the effect of the production practices on the workers' task demands. The NASA Task Load Index was used to measure the perceived task demands of two work crews. The operation involved the construction of a cast-in-place concrete building under high schedule pressures. Interviews with each crew member were used to identify the main sources of the perceived demands. Extensive field observations and interviews with the supervisors and crews identified the production practices. The workers perceived different level of task demands depending on their role. The production practices influenced the task demands in two ways: (1) practices related to work organization, task design, resource management, and crew management mitigated the task demands; and (2) other practices related to work planning and crew management increased the crew's ability to cope with and adapt to high task demands. The findings identify production practices that regulate the workers' task demands. The effect of task demands on performance is mitigated by the ability to cope with high demands.
A Conceptual Framework for Adaptive Project Management in the Department of Defense
2016-04-30
schedule work) established a core set of principles that went unchallenged until the start of the 21st century. This belief that managing...detailed planning, task decomposition and assignment of hours at the start of a project as unnecessary, often wasted effort that sacrifices accuracy...with the illusion of precision. Work, at the task level, is best assigned by the team performing the work as close as possible to the actual start
2007-01-01
gency Management Association ( NEMA ) to explore application of the Emergency Management Assistance Compact (EMAC) model to the task of identifying...organizations combined—are the norm . The challenge for government and the private sector is to ensure that donated goods and services from the latter...Association ( NEMA ). EOC – Emergency Operations Center – the central command and control facility responsible for carrying out emergency preparedness and
Proposal of Constraints Analysis Method Based on Network Model for Task Planning
NASA Astrophysics Data System (ADS)
Tomiyama, Tomoe; Sato, Tatsuhiro; Morita, Toyohisa; Sasaki, Toshiro
Deregulation has been accelerating several activities toward reengineering business processes, such as railway through service and modal shift in logistics. Making those activities successful, business entities have to regulate new business rules or know-how (we call them ‘constraints’). According to the new constraints, they need to manage business resources such as instruments, materials, workers and so on. In this paper, we propose a constraint analysis method to define constraints for task planning of the new business processes. To visualize each constraint's influence on planning, we propose a network model which represents allocation relations between tasks and resources. The network can also represent task ordering relations and resource grouping relations. The proposed method formalizes the way of defining constraints manually as repeatedly checking the network structure and finding conflicts between constraints. Being applied to crew scheduling problems shows that the method can adequately represent and define constraints of some task planning problems with the following fundamental features, (1) specifying work pattern to some resources, (2) restricting the number of resources for some works, (3) requiring multiple resources for some works, (4) prior allocation of some resources to some works and (5) considering the workload balance between resources.
Improving Hospital Discharge Planning for Elderly Patients
Potthoff, Sandra; Kane, Robert L.; Franco, Sheila J.
1997-01-01
Hospital discharge planning has become increasingly important in an era of prospective payment and managed care. Given the changes in tasks, decisions, and environments involved, it is important to identify how to move such planning from an art to an empirically based decisionmaking process. The authors use a decision-sciences framework to review the state-of-the-art of hospital discharge planning and to suggest methods for improvement. PMID:10345406
48 CFR 1034.004 - Acquisition strategy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Order, Task Order, or Interagency Agreement) to the overall investment requirements and management... investment; (3) A description of the effort, by acquisition, and the plans to include required clauses in the... requirements to manage the acquisition processes through the investment lifecycle; (7) Consideration of optimal...
Aviation human-in-the-loop simulation studies : experimental planning, design, and data management.
DOT National Transportation Integrated Search
2014-01-01
Researchers from the NASAAmes Flight Cognition Laband the FAAs Aerospace Human Factors Research Lab at the Civil Aerospace Medical Instituteexamined task and workload management by single pilots in very light jets, also called entry-level jets.Thi...
Cost accounting, management control, and planning in health care.
Siegrist, R B; Blish, C S
1988-02-01
Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)
Hospital renovation projects: phased construction requires planning at its best.
Cox, J C
1986-01-01
Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.
Callie Schweitzer; Stacy L. Clark; Kurt W. Gottschalk; Jeff Stringer; Robbie Sitzlar
2014-01-01
Determining targets in forest restoration is a complicated task that can be facilitated by cooperative partnerships. Too often restoration plans are implemented after adverse events that cause widespread tree mortality, such as drought or insect outbreaks, have occurred. Reactive management precludes the use of preemptive management techniques that can result in more...
ERIC Educational Resources Information Center
Johnson, Adam W.
2016-01-01
As a growing entity within higher education organizational structures, enrollment managers (EMs) are primarily tasked with projecting, recruiting, and retaining the student population of their campuses. Enrollment managers are expected by institutional presidents as well as through industry standards to make data-driven planning decisions to reach…
The ground vehicle manager's associate
NASA Technical Reports Server (NTRS)
Edwards, Gary R.; Burnard, Robert H.; Bewley, William L.; Bullock, Bruce L.
1994-01-01
An overview of MAX, a software framework for manager's associate systems, is presented. MAX is used to develop and execute a problem-solving strategy for the task planning of semi-autonomous agents with the assistance of human performance. This paper describes the use of MAX in the supervisory management of robotic vehicles as they explore a planetary surface.
ERIC Educational Resources Information Center
Johnson, Adam W.
2013-01-01
As a growing entity within higher education organizational structures, enrollment managers (EMs) are primarily tasked with projecting, recruiting, and retaining the student population of their campuses. Enrollment managers are expected by institutional presidents as well as through industry standards to make data-driven planning decisions to reach…
Why are you late? Investigating the role of time management in time-based prospective memory.
Waldum, Emily R; McDaniel, Mark A
2016-08-01
Time-based prospective memory tasks (TBPM) are those that are to be performed at a specific future time. Contrary to typical laboratory TBPM tasks (e.g., hit the Z key every 5 min), many real-world TBPM tasks require more complex time-management processes. For instance, to attend an appointment on time, one must estimate the duration of the drive to the appointment and then use this estimate to create and execute a secondary TBPM intention (e.g., "I need to start driving by 1:30 to make my 2:00 appointment on time"). Future under- and overestimates of drive time can lead to inefficient TBPM performance with the former lending to missed appointments and the latter to long stints in the waiting room. Despite the common occurrence of complex TBPM tasks in everyday life, to date, no studies have investigated how components of time management, including time estimation, affect behavior in such complex TBPM tasks. Therefore, the current study aimed to investigate timing biases in both older and younger adults and, further, to determine how such biases along with additional time management components including planning and plan fidelity influence complex TBPM performance. Results suggest for the first time that younger and older adults do not always utilize similar timing strategies, and as a result, can produce differential timing biases under the exact same environmental conditions. These timing biases, in turn, play a vital role in how efficiently both younger and older adults perform a later TBPM task that requires them to utilize their earlier time estimate. (PsycINFO Database Record (c) 2016 APA, all rights reserved).
Duty Module Methodology for Officer Career Management System Development: Task Data Bank, Task List.
1975-11-01
and supply of communications equipment. O-G-1 0427 Prepare communications portion of unit SOP, operations orders, and plans. O-G-1 0428 Interpret...property for sale into commrercial categories. 0-FF-10 1307 Prepare formal advertising and invitations to bid and make other authorized arrangements for
NASA Technical Reports Server (NTRS)
Chu, Y. Y.
1978-01-01
A unified formulation of computer-aided, multi-task, decision making is presented. Strategy for the allocation of decision making responsibility between human and computer is developed. The plans of a flight management systems are studied. A model based on the queueing theory was implemented.
A Cyclical Plan for Using Study Strategies.
ERIC Educational Resources Information Center
Hayes, David A.; Alvermann, Donna E.
1984-01-01
A cyclical plan for studying that takes into account information processing strategies and their effective management by students consists of (1) specifying study purposes, (2) previewing the materials, (3) proceeding through the task incrementally, and (4) connecting the content to be learned to other knowledge about the material studied. Setting…
Nine steps towards a better water meter management.
Arregui, F J; Soriano, J; Cabrera, E; Cobacho, R
2012-01-01
The paper provides a comprehensive perspective of the critical aspects to be taken into account when planning the long-term management of water meters in a utility. In order to facilitate their quick understanding and practical implementation, they have been structured into nine steps. Ranging from an initial audit up to the final periodic meter replacement planning, these steps cover three aspects of the problem - field work, laboratory work and management tasks; and each one is developed in detail paying attention to the particular data needed and noting the practical outcome it will yield.
A task control architecture for autonomous robots
NASA Technical Reports Server (NTRS)
Simmons, Reid; Mitchell, Tom
1990-01-01
An architecture is presented for controlling robots that have multiple tasks, operate in dynamic domains, and require a fair degree of autonomy. The architecture is built on several layers of functionality, including a distributed communication layer, a behavior layer for querying sensors, expanding goals, and executing commands, and a task level for managing the temporal aspects of planning and achieving goals, coordinating tasks, allocating resources, monitoring, and recovering from errors. Application to a legged planetary rover and an indoor mobile manipulator is described.
Smith, A F; Wild, C; Law, J
2005-04-01
To document the organisational response of Furness General Hospital to the large outbreak of legionnaire's disease in April 2002 and assess the contribution made by the hospital's major incident plan. Qualitative analysis of interview transcripts and written comments from some staff involved in the management of the incident. Documentary analysis of major incident plan and other written materials. The incident posed considerable managerial and clinical problems and this paper describes how they were overcome. In particular, strategies for dealing with supply (of staff, beds, and resources) and managing demand (by liaising with primary care and the public) seem to have been successful. Many functions necessary for managing the incident were poorly dealt with in the plan, especially procedures for handling the news media and liaison with agencies outside the hospital. Lack of explicit guidance appeared not to hinder the organisational response. There may have been an unspoken high level decision to allow staff to draw on their skills and experience in improvising a response to the initial challenge and learning adaptively as the incident unfolded. There was also evidence that staff disregarded existing job and role boundaries and focused instead on tasks, working flexibly to ensure that these tasks were completed. Protracted major incidents pose particular management challenges and may benefit from an approach different from that set out in typical major incident plans. Staff must be able to act flexibly and responsively. Some form of checklist or toolkit may be preferable to a detailed plan for some types of incident.
Smith, A; Wild, C; Law, J
2005-01-01
Objective: To document the organisational response of Furness General Hospital to the large outbreak of legionnaire's disease in April 2002 and assess the contribution made by the hospital's major incident plan. Method: Qualitative analysis of interview transcripts and written comments from some staff involved in the management of the incident. Documentary analysis of major incident plan and other written materials. Results: The incident posed considerable managerial and clinical problems and this paper describes how they were overcome. In particular, strategies for dealing with supply (of staff, beds, and resources) and managing demand (by liaising with primary care and the public) seem to have been successful. Many functions necessary for managing the incident were poorly dealt with in the plan, especially procedures for handling the news media and liaison with agencies outside the hospital. Lack of explicit guidance appeared not to hinder the organisational response. There may have been an unspoken high level decision to allow staff to draw on their skills and experience in improvising a response to the initial challenge and learning adaptively as the incident unfolded. There was also evidence that staff disregarded existing job and role boundaries and focused instead on tasks, working flexibly to ensure that these tasks were completed. Conclusions: Protracted major incidents pose particular management challenges and may benefit from an approach different from that set out in typical major incident plans. Staff must be able to act flexibly and responsively. Some form of checklist or toolkit may be preferable to a detailed plan for some types of incident. PMID:15788822
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
ERIC Educational Resources Information Center
Murphy, Linda; Della Corte, Suzanne
1991-01-01
This newsletter issue discusses time management techniques for parents of special needs children. Techniques include changing one's attitudes about perfection, prioritizing tasks, having a back-up plan, learning to say "no," asking for help, keeping things simple, hiring others, using waiting time wisely, and doing two things at once. Household…
Larsson, Lena Gunvor; Bäck-Pettersson, Siv; Kylén, Sven; Marklund, Bertil; Carlström, Eric
2017-01-01
The aim of this study was to investigate primary care managers' perceptions of their capability in providing care planning to patients with complex needs. Care planning is defined as a process where the patient, family and health professionals engage in dialogue about the patient's care needs and plan care interventions together. Semi-structured interviews with 18 primary care managers in western Sweden were conducted using Westrin's theoretical cooperation model. Data were analysed using a qualitative deductive method. Results reveal that the managers' approach to care planning was dominated by non-cooperation and separation. The managers were permeated by uncertainty about the meaning of the task of care planning as such. They did not seem to be familiar with the national legislation stipulating that every healthcare provider must meet patients' need for care interventions and participate in the care planning. To accomplish care planning, the process needs to cross - and overcome - both professional and organisational boundaries. There is also a need for incentives to develop working methods that promote local cooperation in order to facilitate optimal care for patients with complex needs. Copyright © 2016. Published by Elsevier Ireland Ltd.
MO-F-CAMPUS-T-05: SQL Database Queries to Determine Treatment Planning Resource Usage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, C; Gladstone, D
2015-06-15
Purpose: A radiation oncology clinic’s treatment capacity is traditionally thought to be limited by the number of machines in the clinic. As the number of fractions per course decrease and the number of adaptive plans increase, the question of how many treatment plans a clinic can plan becomes increasingly important. This work seeks to lay the ground work for assessing treatment planning resource usage. Methods: Care path templates were created using the Aria 11 care path interface. Care path tasks included key steps in the treatment planning process from the completion of CT simulation through the first radiation treatment. SQLmore » Server Management Studio was used to run SQL queries to extract task completion time stamps along with care path template information and diagnosis codes from the Aria database. 6 months of planning cycles were evaluated. Elapsed time was evaluated in terms of work hours within Monday – Friday, 7am to 5pm. Results: For the 195 validated treatment planning cycles, the average time for planning and MD review was 22.8 hours. Of those cases 33 were categorized as urgent. The average planning time for urgent plans was 5 hours. A strong correlation between diagnosis code and range of elapsed planning time was as well as between elapsed time and select diagnosis codes was observed. It was also observed that tasks were more likely to be completed on the date due than the time that they were due. Follow-up confirmed that most users did not look at the due time. Conclusion: Evaluation of elapsed planning time and other tasks suggest that care paths should be adjusted to allow for different contouring and planning times for certain diagnosis codes and urgent cases. Additional clinic training around task due times vs dates or a structuring of care paths around due dates is also needed.« less
The integrated rangeland fire management strategy actionable science plan
Aldridge, Cameron L.; Berg, Ken; Boyd, Chad S.; Boyte, Stephen P.; Bradford, John B.; Brunson, Ed; Cissel, John H.; Conway, Courtney J.; Chalfoun, Anna D.; Chambers, Jeanne C.; Clark, Patrick; Coates, Peter S.; Crist, Michele R.; Davis, Dawn M.; DeCrappeo, Nicole; Deibert, Patricia A.; Doherty, Kevin E.; Evers, Louisa B.; Finch, Deborah M.; Finn, Sean P.; Germino, Matthew J.; Glenn, Nancy F.; Gucker, Corey; Hall, John A.; Hanser, Steven E.; Havlina, Douglas W.; Heinrichs, Julie; Heller, Matt; Homer, Collin G.; Hunter, Molly E.; Jacobs, Ruth W.; Karl, Jason W.; Kearney, Richard; Kemp, Susan K; Kilkenny, Francis F.; Knick, Steven T.; Launchbaugh, Karen; Manier, Daniel J.; Mayer, Kenneth E.; Meyer, Susan E.; Monroe, Adrian; MontBlanc, Eugénie; Newingham, Beth A.; Pellant, Michael L.; Phillips, Susan L.; Pilliod, David S.; Ricca, Mark A.; Richardson, Bryce A.; Rose, Jeffrey A.; Shaw, Nancy; Sheley, Roger L.; Shinneman, Douglas J.; Wiechman , Lief A.; Wylie, Bruce K.
2016-01-01
The Integrated Rangeland Fire Management Strategy (hereafter Strategy, DOI 2015) outlined the need for coordinated, science-based adaptive management to achieve long-term protection, conservation, and restoration of the sagebrush (Artemisia spp.) ecosystem. A key component of this management approach is the identification of knowledge gaps that limit implementation of effective strategies to meet current management challenges. The tasks and actions identified in the Strategy address several broad topics related to management of the sagebrush ecosystem. This science plan is organized around these topics and specifically focuses on fire, invasive plant species and their effects on altering fire regimes, restoration, sagebrush and greater sage-grouse (Centrocercus urophasianus), and climate and weather.
NASA Astrophysics Data System (ADS)
The U.S. Integrated Ocean Observing System (IOOS) is encouraging public comment on the draft plan for its Data Management and Communications (DMAC∥ component. The deadline for receipt of comments has been extended to 18 November 2003. The plan can be found at http://www.dmac.ocean.us/dacsc/imp_plan.jsp. The plan was developed by the DMAC Steering Committee, which includes representatives from federal and state agencies, private industry, and academia. This committee was tasked by Ocean.US (the national office for IOOS) with the preparation of a detailed, phased DMAC implementation plan, and initial oversight of its implementation. The scope of the plan includes the IOOS DMAC infrastructure, data archive and access, and basic information products needed for assessing the availability and quality of data within IOOS. Four expert teams (Data Transport, Metadata and Data Discovery, Data Archive and Access, Applications and Products), and two outreach teams (Data Facilities Management, and User Outreach), were assembled to assist in developing material for the plan.
NASA Technical Reports Server (NTRS)
1976-01-01
The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.
Handling Emergency Management in [an] Object Oriented Modeling Environment
NASA Technical Reports Server (NTRS)
Tokgoz, Berna Eren; Cakir, Volkan; Gheorghe, Adrian V.
2010-01-01
It has been understood that protection of a nation from extreme disasters is a challenging task. Impacts of extreme disasters on a nation's critical infrastructures, economy and society could be devastating. A protection plan itself would not be sufficient when a disaster strikes. Hence, there is a need for a holistic approach to establish more resilient infrastructures to withstand extreme disasters. A resilient infrastructure can be defined as a system or facility that is able to withstand damage, but if affected, can be readily and cost-effectively restored. The key issue to establish resilient infrastructures is to incorporate existing protection plans with comprehensive preparedness actions to respond, recover and restore as quickly as possible, and to minimize extreme disaster impacts. Although national organizations will respond to a disaster, extreme disasters need to be handled mostly by local emergency management departments. Since emergency management departments have to deal with complex systems, they have to have a manageable plan and efficient organizational structures to coordinate all these systems. A strong organizational structure is the key in responding fast before and during disasters, and recovering quickly after disasters. In this study, the entire emergency management is viewed as an enterprise and modelled through enterprise management approach. Managing an enterprise or a large complex system is a very challenging task. It is critical for an enterprise to respond to challenges in a timely manner with quick decision making. This study addresses the problem of handling emergency management at regional level in an object oriented modelling environment developed by use of TopEase software. Emergency Operation Plan of the City of Hampton, Virginia, has been incorporated into TopEase for analysis. The methodology used in this study has been supported by a case study on critical infrastructure resiliency in Hampton Roads.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, K.A.; Mitchell, M.M.; Jean, D.
1997-09-01
This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations.
Simulating Mission Command for Planning and Analysis
2015-06-01
mission plan. 14. SUBJECT TERMS Mission Planning, CPM , PERT, Simulation, DES, Simkit, Triangle Distribution, Critical Path 15. NUMBER OF...Battalion Task Force CO Company CPM Critical Path Method DES Discrete Event Simulation FA BAT Field Artillery Battalion FEL Future Event List FIST...management tools that can be utilized to find the critical path in military projects. These are the Critical Path Method ( CPM ) and the Program Evaluation and
DOT National Transportation Integrated Search
2017-12-01
Traffic incidents have long been recognized as the main contributor to congestion in highway networks. Thus, contending with non-recurrent congestion has been a priority task for most highway agencies over the past decades. Under most incident scenar...
NASA Technical Reports Server (NTRS)
Sapp, T. P.; Davin, D. E.
1977-01-01
The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.
Energy and Power Aware Computing Through Management of Computational Entropy
2008-01-01
18 2.4.1 ACIP living framework forum task...This research focused on two sub- tasks: (1) Assessing the need and planning for a potential “Living Framework Forum ” (LFF) software architecture...probabilistic switching with plausible device realizations to save energy in our patent application [35]. In [35], we showed an introverted switch in
Fetal Alcohol Spectrum Disorders (FASDs): Diagnosis
... reactions. Executive functioning deficits These deficits involve the thinking processes that help a person manage life tasks. Such deficits include poor organization and planning, lack of inhibition, difficulty grasping cause ...
77 FR 29593 - North Pacific Fishery Management Council; Public Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Particular Concern (HAPC) skate egg sites. 4. BSAI Crab Rebuilding Crab Plan Team report on Set catch Specifications for 4 stocks; Final action on Pribilof Bristol Bay Red King Crab rebuilding plan. 5. Freezer... and tasking. 8. Other Business The SSC agenda will include the following issues: 1. EFH 2. BSAI Crab...
ERIC Educational Resources Information Center
Valente, Mario Manuel
2011-01-01
Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…
Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success
NASA Astrophysics Data System (ADS)
Perera, Jeevan; Holsomback, Jerry D.
2005-12-01
Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
NASA Astrophysics Data System (ADS)
Ladaniuk, Anatolii; Ivashchuk, Viacheslav; Kisała, Piotr; Askarova, Nursanat; Sagymbekova, Azhar
2015-12-01
Conditions of diversification of enterprise products are involving for changes of higher levels of management hierarchy, so it's leading by tasks correcting and changing schedule for operating of production plans. Ordinary solve by combination of enterprise resource are planning and management execution system often has exclusively statistical content. So, the development of decision support system, that helps to use knowledge about subject for capabilities estimating and order of operation of production object is relevant in this time.
2004-07-01
sampler, project manager, data reviewer, statistician , risk assessor, assessment personnel, and laboratory QC manager. In addition, a complete copy of...sample • Corrective actions to be taken if the QC sample fails these criteria • A description of how the QC data and results are to be documented and...Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans Evaluating, Assessing, and Documenting
NASA Astrophysics Data System (ADS)
Romanyuk, Vera; Karyakina, Anna; Vershkova, Elena; Grinkevish, Larisa; Pozdeeva, Galina
2016-09-01
The article deals with the financial planning of oil and gas company activities including capital structure optimization. One of the main tasks of up-to-date financial management is to optimize the capital structure of an organization and minimize the weighted average cost of capital. The applied method in capital structure optimization affects the research quality results, as well as management decisions. The study was conducted on the basis of OJSC "Surgutneftegas" financial statements.
NASA Technical Reports Server (NTRS)
Tenney, Yvette J.; Rogers, William H.; Pew, Richard W.
1995-01-01
There has been much concern in recent years about the rapid increase in automation on commercial flight decks. The survey was composed of three major sections. The first section asked pilots to rate different automation components that exist on the latest commercial aircraft regarding their obtrusiveness and the attention and effort required in using them. The second section addressed general 'automation philosophy' issues. The third section focused on issues related to levels and amount of automation. The results indicate that pilots of advanced aircraft like their automation, use it, and would welcome more automation. However, they also believe that automation has many disadvantages, especially fully autonomous automation. They want their automation to be simple and reliable and to produce predictable results. The biggest needs for higher levels of automation were in pre-flight, communication, systems management, and task management functions, planning as well as response tasks, and high workload situations. There is an irony and a challenge in the implications of these findings. On the one hand pilots would like new automation to be simple and reliable, but they need it to support the most complex part of the job--managing and planning tasks in high workload situations.
ERIC Educational Resources Information Center
Rodgers, Kenneth W.; Rhodes, Isabelle N.
The impact of NCHEMS (National Center for Higher Education Management Systems) products upon planning and management tasks is examined in this study performed at a sample of 126 institutions. The institutions have used one or more of the following NCHEMS products: Program Classification of Structure (PCS); Resource Requirements Prediction Model…
1996-1997 TEMA/DOE oversite annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-01-01
The Tennessee Emergency Management Agency (TEMA) has entered into a five-year agreement with the Department of Energy (DOE) to provide emergency response activities associated with the Oak Ridge Reservation (ORR). The Agreement in Principle (AIP) delineates the duties and responsibilities of the parties. The agreement tasked TEMA with the following responsibilities: develop offsite emergency plans; conduct emergency management training; develop offsite emergency organizations; develop emergency communications; develop emergency facilities; conduct exercises and drills; provide detection and protection equipment; and develop an emergency staff. This document reports on progress on these tasks during the past year.
Plan for conducting an international machine tool task force
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sutton, G.P.; McClure, E.R.; Schuman, J.F.
1978-08-28
The basic objectives of the Machine Tool Task Force (MTTF) are to characterize and summarize the state of the art of cutting machine tool technology and to identify promising areas of future R and D. These goals will be accomplished with a series of multidisciplinary teams of prominent experts and individuals experienced in the specialized technologies of machine tools or in the management of machine tool operations. Experts will be drawn from all areas of the machine tool community: machine tool users or buyer organizations, builders, and R and D establishments including universities and government laboratories, both domestic and foreign.more » A plan for accomplishing this task is presented. The area of machine tool technology has been divided into about two dozen technology subjects on which teams of one or more experts will work. These teams are, in turn, organized into four principal working groups dealing, respectively, with machine tool accuracy, mechanics, control, and management systems/utilization. Details are presented on specific subjects to be covered, the organization of the Task Force and its four working groups, and the basic approach to determining the state of the art of technology and the future directions of this technology. The planned review procedure, the potential benefits, our management approach, and the schedule, as well as the key participating personnel and their background are discussed. The initial meeting of MTTF members will be held at a plenary session on October 16 and 17, 1978, in Scottsdale, AZ. The MTTF study will culminate in a conference on September 1, 1980, in Chicago, IL, immediately preceeding the 1980 International Machine Tool Show. At this time, our results will be released to the public; a series of reports will be published in late 1980.« less
The Strategic Attitude: Integrating Strategic Planning into Daily University Worklife
ERIC Educational Resources Information Center
Dickmeyer, Nathan
2004-01-01
Chief financial officers in today's universities are so busy with the challenges of day-to-day management that strategic thinking often takes a back seat. Planning for strategic change can go a long way toward streamlining the very daily tasks that obscure the "big picture." Learning how to integrate strategic thinking into day-to-day management…
Training Community Modeling and Simulation Business Plan: 2008 Edition
2009-12-01
Collaborative information environment. Collaborative tools will help CCDRs and joint staffs plan and disseminate operations, link the staffs to subject matter...anticipating direct and indirect effects as they propagate through political, military, economic, sociological, and information infrastructures. Capabilities...will also 5-11 enhance training for joint staffs and task forces; crisis management; JUO; information warfare; interagency, intergovernmental, and
A Web Browser Interface to Manage the Searching and Organizing of Information on the Web by Learners
ERIC Educational Resources Information Center
Li, Liang-Yi; Chen, Gwo-Dong
2010-01-01
Information Gathering is a knowledge construction process. Web learners make a plan for their Information Gathering task based on their prior knowledge. The plan is evolved with new information encountered and their mental model is constructed through continuously assimilating and accommodating new information gathered from different Web pages. In…
Space station data system analysis/architecture study. Task 3: Trade studies, DR-5, volume 2
NASA Technical Reports Server (NTRS)
1985-01-01
Results of a Space Station Data System Analysis/Architecture Study for the Goddard Space Flight Center are presented. This study, which emphasized a system engineering design for a complete, end-to-end data system, was divided into six tasks: (1); Functional requirements definition; (2) Options development; (3) Trade studies; (4) System definitions; (5) Program plan; and (6) Study maintenance. The Task inter-relationship and documentation flow are described. Information in volume 2 is devoted to Task 3: trade Studies. Trade Studies have been carried out in the following areas: (1) software development test and integration capability; (2) fault tolerant computing; (3) space qualified computers; (4) distributed data base management system; (5) system integration test and verification; (6) crew workstations; (7) mass storage; (8) command and resource management; and (9) space communications. Results are presented for each task.
Empirical yield tables for spruce-fir cut-over lands in the Northeast
Marinus Westveld
1953-01-01
Predicting future timber yields is an unavoidable task for the forest manager who is interested in growing timber as a long-term investment. He must predict yields as a basis for formulating management plans and policies. And he must predict yields from lands that differ greatly in productivity.
Space station data system analysis/architecture study. Task 5: Program plan
NASA Technical Reports Server (NTRS)
1985-01-01
Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.
Kiefer, Stephan; Schäfer, Michael; Bransch, Marco; Brimmers, Peter; Bartolomé, Diego; Baños, Janie; Orr, James; Jones, Dave; Jara, Maximilian; Stockmann, Martin
2014-01-01
A personal health system platform for the management of patients with chronic liver disease that incorporates a novel approach to integrate decision support and guidance through care pathways for patients and their doctors is presented in this paper. The personal health system incorporates an integrated decision support engine that guides patients and doctors through the management of the disease by issuing tasks and providing recommendations to both the care team and the patient and by controlling the execution of a Care Flow Plan based on the results of tasks and the monitored health status of the patient. This Care Flow Plan represents a formal, business process based model of disease management designed off-line by domain experts on the basis of clinical guidelines, knowledge of care pathways and an organisational model for integrated, patient-centred care. In this way, remote monitoring and treatment are dynamically adapted to the patient's actual condition and clinical symptoms and allow flexible delivery of care with close integration of specialists, therapists and care-givers.
Strategic Planning: A Practical Primer for the Healthcare Provider: Part I.
Baum, Neil; Brockmann, Erich N; Lacho, Kenneth J
2016-01-01
Entrepreneurs are known for opportunity recognition--that is, "How can I start a business to make money from this opportunity?" However, once a commercial entity is formed to take advantage of an opportunity, the leadership priority shifts from entrepreneurial to strategic. A strategic perspective leverages limited resources to position a business for future success relative to rivals in a competitive environment. Often, the talents needed for one priority are not the same as those needed for the other. This article, the first part of a two-part article, intends to simplify the transition from an entrepreneurial to a strategic focus. It walks an entrepreneur through the strategic management planning process using a fictional business. The various tasks in the process (i.e., mission, vision, internal analysis, external analysis) are illustrated with examples from a typical primary physician's private practice. The examples show how the strategic management tasks are interrelated and ultimately lead to a philosophical approach to managing a business.
Federal, provincial and territorial public health response plan for biological events.
McNeill, R; Topping, J
2018-01-04
The Federal/Provincial/Territorial (FPT) Public Health Response Plan for Biological Events was developed for the Public Health Network Council (PHNC). This plan outlines how the national response to public health events caused by biological agents will be conducted and coordinated, with a focus on implementation of responses led by senior-level FPT public health decision-makers. The plan was developed by an expert task group and was approved by PHNC in October, 2017. The plan describes roles, responsibilities and authorities of FPT governments for public health and emergency management, a concept of operations outlining four scalable response levels and a governance structure that aims to facilitate an efficient, timely, evidence-informed and consistent approach across jurisdictions. Improving effective engagement amongst public health, health care delivery and health emergency management authorities is a key objective of the plan.
Federal, provincial and territorial public health response plan for biological events
McNeill, R; Topping, J
2018-01-01
The Federal/Provincial/Territorial (FPT) Public Health Response Plan for Biological Events was developed for the Public Health Network Council (PHNC). This plan outlines how the national response to public health events caused by biological agents will be conducted and coordinated, with a focus on implementation of responses led by senior-level FPT public health decision-makers. The plan was developed by an expert task group and was approved by PHNC in October, 2017. The plan describes roles, responsibilities and authorities of FPT governments for public health and emergency management, a concept of operations outlining four scalable response levels and a governance structure that aims to facilitate an efficient, timely, evidence-informed and consistent approach across jurisdictions. Improving effective engagement amongst public health, health care delivery and health emergency management authorities is a key objective of the plan. PMID:29770090
2016-11-01
personnel, career paths for program managers, plans to strengthen program management, and use of special hiring authorities) Monitor and report...agencies with direct hiring authority for program managers and directed OPM to create a specialized career path. OMB also tasked agencies with...guidance for developing career paths for IT program managers.14 OPM’s career path guide was to build upon its IT Program Management Competency Model
Expert Systems in Contract Management. A Pilot Study.
1985-10-01
and appropriately selected .1 ~..they can provide valuable assistance to managers in their tasks of planning and control. If these techniques are to ...the programs that would affect their relevance -> . to construction management applications in general. We also ascertained which programs have... further experience of SAVOIR applied in a fairly complex real-world domain This has, in their view, confirmed the suitability of SAVOIR for the domain
Scheduling Operational Operational-Level Courses of Action
2003-10-01
Process modelling and analysis – process synchronisation techniques Information and knowledge management – Collaborative planning systems – Workflow...logistics – Some tasks may consume resources The military user may wish to impose synchronisation constraints among tasks A military end state can be...effects, – constrained with resource and synchronisation considerations, and – lead to the achievement of conditions set in the end state. The COA is
Feasibility study for early removal of HEU from CPP-651-Phase II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, C.V.; Henry, R.; Milligan, C.
1997-09-01
A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology andmore » the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.« less
Approach of Decision Making Based on the Analytic Hierarchy Process for Urban Landscape Management
NASA Astrophysics Data System (ADS)
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Approach of decision making based on the analytic hierarchy process for urban landscape management.
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Labor of love. A model for planning human resource needs.
Brady, F J
1989-01-01
Typically, the annual budgeting process is the hospital's only attempt to forecast human resource requirements. In times of rapid change, this traditional ad hoc approach is incapable of satisfying either the Catholic hospital's ethical obligations as an employer or its responsibilities to provide healthcare to the poor and suffering. Assumptions about future activity, including volume projections on admissions, patient days, and other services, influence the budgeting process to a large degree. Because the amount of work to be done and the number of employees required to do it are related, changes in demand for service immediately and directly affect staffing requirements. A hospital cannot achieve ethical human resource management or provide high-quality healthcare if inadequate planning forces management into a cycle of crisis-coping--reacting to this year's nursing shortage with a major recruiting effort and next year's financial crunch with a traumatic reduction in force. The human resource planning approach outlined here helps the hospital meet legitimate business needs while satisfying its ethical obligations. The model has four phases and covers a charge to the planning committee; committee appointments; announcements; the establishment of ground rules, focus, and task forces; and the work of each task force.
MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laub, S; Dunn, M; Galbreath, G
2015-06-15
Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less
RDMO - Research Data Management Organiser
NASA Astrophysics Data System (ADS)
Klar, Jochen; Engelhardt, Claudia; Neuroth, Heike; Enke, Harry; Ludwig, Jens
2017-04-01
The Research Data Management Organiser (RDMO) is a new tool to support the structured planning and implementation of the research data management in a scientific project and, in addition, provide the scientist with a textual Data Management Plan (DMP). While DMP are in principle a great tool to optimise the data management during all stages of a research project and to serve as a roadmap for the various data management tasks, their current usage is strongly focused on the requirements of funding agencies. Existing software tools for DMP creation and editing are useful in that respect, but do not sufficiently support the full data life cycle of a project. The RDMO is meant to be a companion for data management issues during and after the whole project. Starting from a structured interview about the project and the data involved, it organizes the data management along tasks and comprises all relevant stakeholders, i.e. researchers, PIs, institutional data managers, IT departments. Adaptations to discipline-specific or institutional needs are supported. The installation of the tool into local environments and its integration into existing administrative IT infrastructure and work flows is given special consideration. The tool is multilingual (at first German and English). In my talk, I will present the different features of the software, show its current stage of development, and how RDMO can be deployed for your institution.
Gordon, Debra B; Dahl, June L; Miaskowski, Christine; McCarberg, Bill; Todd, Knox H; Paice, Judith A; Lipman, Arthur G; Bookbinder, Marilyn; Sanders, Steve H; Turk, Dennis C; Carr, Daniel B
2005-07-25
The American Pain Society (APS) set out to revise and expand its 1995 Quality Improvement Guidelines for the Treatment of Acute Pain and Cancer Pain and to facilitate improvements in the quality of pain management in all care settings. Eleven multidisciplinary members of the APS with expertise in quality improvement or measurement participated in the update. Five experts from organizations that focus on health care quality reviewed the final recommendations. MEDLINE and Cumulative Index to Nursing and Allied Health Literature databases were searched (1994-2004) to identify articles on pain quality measurement and quality improvement published after the development of the 1995 guidelines. The APS task force revised and expanded recommendations on the basis of the systematic review of published studies. The more than 3000 members of the APS were invited to provide input, and the 5 experts provided additional comments. The task force synthesized reviewers' comments into the final set of recommendations. The recommendations specify that all care settings formulate structured, multilevel systems approaches (sensitive to the type of pain, population served, and setting of care) that ensure prompt recognition and treatment of pain, involvement of patients and families in the pain management plan, improved treatment patterns, regular reassessment and adjustment of the pain management plan as needed, and measurement of processes and outcomes of pain management. Efforts to improve the quality of pain management must move beyond assessment and communication of pain to implementation and evaluation of improvements in pain treatment that are timely, safe, evidence based, and multimodal.
Program definition and assessment overview. [for thermal energy storage project management
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1980-01-01
The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.
An Expert Supervisor For A Robotic Work Cell
NASA Astrophysics Data System (ADS)
Moed, M. C.; Kelley, R. B.
1988-02-01
To increase task flexibility in a robotic assembly environment, a hierarchical planning and execution system is being developed which will map user specified 3D part assembly tasks into various target robotic work cells, and execute these tasks efficiently using manipulators and sensors available in the work cell. One level of this hierarchy, the Supervisor, is responsible for assigning subtasks of a system generated Task Plan to a set of task specific Specialists and on-line coordination of the activity of these Specialists to accomplish the user specified assembly. The design of the Supervisor can be broken down into five major functional blocks: resource management; concurrency detection; task scheduling; error recovery; and interprocess communication. The Supervisor implementation has been completed on a VAX 11/750 under a Unix environment. PC card Pick-Insert experiments were performed to test this implementation. To test the robustness of the architecture, the Supervisor was then transported to a new work cell under a VMS environment. The experiments performed under Supervisor control in both implementations are discussed after a brief explanation of the functional blocks of the Supervisor and the other levels in the hierarchy.
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Programme Costing - A Logical Step Toward Improved Management.
ERIC Educational Resources Information Center
McDougall, Ronald N.
The analysis of costs of university activities from a functional or program point of view, rather than an organizational unit basis, is not only an imperative for the planning and management of universities, but also a logical method of examing the costs of university operations. A task force of the Committee of Finance Officers-Universities of…
Participative management and shared leadership: implementing a model.
Noonan, D
1995-01-01
The author identifies the development, implementation and outcomes of a task subgroup model of management that provides a mechanism for shared leadership, planning, decision making, implementation and evaluation by staff, patients and families on a program level. The conceptual model and its operationalization are outlined within the context of the rehabilitation program at the Providence Centre in Scarborough, Ontario.
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Crop Identification Technolgy Assessment for Remote Sensing (CITARS). Volume 1: Task design plan
NASA Technical Reports Server (NTRS)
Hall, F. G.; Bizzell, R. M.
1975-01-01
A plan for quantifying the crop identification performances resulting from the remote identification of corn, soybeans, and wheat is described. Steps for the conversion of multispectral data tapes to classification results are specified. The crop identification performances resulting from the use of several basic types of automatic data processing techniques are compared and examined for significant differences. The techniques are evaluated also for changes in geographic location, time of the year, management practices, and other physical factors. The results of the Crop Identification Technology Assessment for Remote Sensing task will be applied extensively in the Large Area Crop Inventory Experiment.
Agent-Based Simulations for Project Management
NASA Technical Reports Server (NTRS)
White, J. Chris; Sholtes, Robert M.
2011-01-01
Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.
NASA Astrophysics Data System (ADS)
1980-09-01
The energy emergency management information system (EEMIS) has responsibility for providing special information and communication services to government officials at Federal and state levels, who must deal with energy emergencies. Because of proprietary information residing in the data base used for federal purposes, a special system (EEMIS-S) must be established for use by the states. It is planned to acquire teleprocessing services for EEMIS-S from a time-sharing commercial vendor, and the process for procurement must meet guidelines for approval. The work plan and schedule for meeting these guidelines are discussed. Tasks to be included contain estimates of time, cost, and resources required, all of which are briefly described.
Parke, Michael R; Weinhardt, Justin M; Brodsky, Andrew; Tangirala, Subrahmaniam; DeVoe, Sanford E
2018-03-01
Does planning for a particular workday help employees perform better than on other days they fail to plan? We investigate this question by identifying 2 distinct types of daily work planning to explain why and when planning improves employees' daily performance. The first type is time management planning (TMP)-creating task lists, prioritizing tasks, and determining how and when to perform them. We propose that TMP enhances employees' performance by increasing their work engagement, but that these positive effects are weakened when employees face many interruptions in their day. The second type is contingent planning (CP) in which employees anticipate possible interruptions in their work and plan for them. We propose that CP helps employees stay engaged and perform well despite frequent interruptions. We investigate these hypotheses using a 2-week experience-sampling study. Our findings indicate that TMP's positive effects are conditioned upon the amount of interruptions, but CP has positive effects that are not influenced by the level of interruptions. Through this study, we help inform workers of the different planning methods they can use to increase their daily motivation and performance in dynamic work environments. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
He, Ji; Dai, Xinbin; Zhao, Xuechun
2007-02-09
BLAST searches are widely used for sequence alignment. The search results are commonly adopted for various functional and comparative genomics tasks such as annotating unknown sequences, investigating gene models and comparing two sequence sets. Advances in sequencing technologies pose challenges for high-throughput analysis of large-scale sequence data. A number of programs and hardware solutions exist for efficient BLAST searching, but there is a lack of generic software solutions for mining and personalized management of the results. Systematically reviewing the results and identifying information of interest remains tedious and time-consuming. Personal BLAST Navigator (PLAN) is a versatile web platform that helps users to carry out various personalized pre- and post-BLAST tasks, including: (1) query and target sequence database management, (2) automated high-throughput BLAST searching, (3) indexing and searching of results, (4) filtering results online, (5) managing results of personal interest in favorite categories, (6) automated sequence annotation (such as NCBI NR and ontology-based annotation). PLAN integrates, by default, the Decypher hardware-based BLAST solution provided by Active Motif Inc. with a greatly improved efficiency over conventional BLAST software. BLAST results are visualized by spreadsheets and graphs and are full-text searchable. BLAST results and sequence annotations can be exported, in part or in full, in various formats including Microsoft Excel and FASTA. Sequences and BLAST results are organized in projects, the data publication levels of which are controlled by the registered project owners. In addition, all analytical functions are provided to public users without registration. PLAN has proved a valuable addition to the community for automated high-throughput BLAST searches, and, more importantly, for knowledge discovery, management and sharing based on sequence alignment results. The PLAN web interface is platform-independent, easily configurable and capable of comprehensive expansion, and user-intuitive. PLAN is freely available to academic users at http://bioinfo.noble.org/plan/. The source code for local deployment is provided under free license. Full support on system utilization, installation, configuration and customization are provided to academic users.
Thoma, Jorun E; Waite, Marion A
2018-03-01
To gain knowledge of nurse case managers' experiences within the German acute care context of collaboration with patients and physicians in a discharge planning role; further to learn about patients' assignment to the management of the nurse case managers; and explicitly to explore critical incidences of interactions between nurse case managers, patients and healthcare practitioner in discharge planning to understand the factor that contributes to effective collaboration. The defined role of nurse case managers in many contexts is a patient-centred responsibility for a central task of discharge management of patients with complex physical and social needs. Some studies have indicated that the general impact of the role reduces readmission rates. Given the necessity to work interprofessionally to achieve a safe discharge, little is known about how nurse case managers achieve this collaboratively. A qualitative case study within a German teaching hospital of nurse case managers (N = 8). Data were collected through semi-structured interviews prompted by a critical incident technique and rigorously analysed through the lenses of sociocultural theory. Consistent object being worked upon was a safe and effective discharge from hospital with a focus on patient advocacy. Significant themes were a self-value or recognition by others of professional expertise, reciprocal value on the capabilities of others thorough relational expertise and negotiation with patients and an identification of case trajectories. More continuity of nurse case managers' care and management, clarity of role and transparency to peers, physicians and other professionals would be beneficial in ensuring appropriate referral of complex patients to nurse case managers responsibility. Clearer role description and benefit realisation of the nurse case managers could be achieved by interventions that are interprofessional and focus on the tasks that matter from a collaborative perspective. This could lead to refinement of available indicators and policy developments. © 2018 John Wiley & Sons Ltd.
Sweeney, Siobhan; Kersel, Denyse; Morris, Robin G; Manly, Tom; Evans, Jonathan J
2010-04-01
Executive functions have been argued to be the most vulnerable to brain injury. In providing an analogue of everyday situations amenable to control and management virtual reality (VR) may offer better insights into planning deficits consequent upon brain injury. Here 17 participants with a non-progressive brain injury and reported executive difficulties in everyday life were asked to perform a VR task (working in a furniture storage unit) that emphasised planning, rule following and prospective memory tasks. When compared with an age and IQ-matched control group, the patients were significantly poorer in terms of their strategy, their time-based prospective memory, the overall time required and their propensity to break rules. An examination of sensitivity and specificity of the VR task to group membership (brain-injured or control) showed that, with specificity set at maximum, sensitivity was only modest (at just over 50%). A second component to the study investigated whether the patients' performance could be improved by periodic auditory alerts. Previous studies have demonstrated that such cues can improve performance on laboratory tests, executive tests and everyday prospective memory tasks. Here, no significant changes in performance were detected. Potential reasons for this finding are discussed, including symptom severity and differences in the tasks employed in previous studies.
Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report
1990-04-05
MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a
Sustaining staff nurse support for a patient care ergonomics program in critical care.
Haney, Linda L; Wright, Laurette
2007-06-01
Applying management concepts from marketing and business sources can assist critical care units with establishing a planned change in the way nurses perform manual handling tasks, and thus, help insure that it is sustained.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less
Cordonnier, Aline; Barnier, Amanda J; Sutton, John
2016-01-01
Research on future thinking has emphasized how episodic details from memories are combined to create future thoughts, but has not yet examined the role of semantic scripts. In this study, participants recalled how they planned a past camping trip in Australia (past planning task) and imagined how they would plan a future camping trip (future planning task), set either in a familiar (Australia) or an unfamiliar (Antarctica) context. Transcripts were segmented into information units that were coded according to semantic category (e.g., where, when, transport, material, actions). Results revealed a strong interaction between tasks and their presentation order. Starting with the past planning task constrained the future planning task when the context was familiar. Participants generated no new information when the future camping trip was set in Australia and completed second (after the past planning task). Conversely, starting with the future planning task facilitated the past planning task. Participants recalled more information units of their past plan when the past planning task was completed second (after the future planning task). These results shed new light on the role of scripts in past and future thinking and on how past and future thinking processes interact.
Advanced Technologies for Future Spacecraft Cockpits and Space-based Control Centers
NASA Technical Reports Server (NTRS)
Garcia-Galan, Carlos; Uckun, Serdar; Gregory, William; Williams, Kerry
2006-01-01
The National Aeronautics and Space Administration (NASA) is embarking on a new era of Space Exploration, aimed at sending crewed spacecraft beyond Low Earth Orbit (LEO), in medium and long duration missions to the Lunar surface, Mars and beyond. The challenges of such missions are significant and will require new technologies and paradigms in vehicle design and mission operations. Current roles and responsibilities of spacecraft systems, crew and the flight control team, for example, may not be sustainable when real-time support is not assured due to distance-induced communication lags, radio blackouts, equipment failures, or other unexpected factors. Therefore, technologies and applications that enable greater Systems and Mission Management capabilities on-board the space-based system will be necessary to reduce the dependency on real-time critical Earth-based support. The focus of this paper is in such technologies that will be required to bring advance Systems and Mission Management capabilities to space-based environments where the crew will be required to manage both the systems performance and mission execution without dependence on the ground. We refer to this concept as autonomy. Environments that require high levels of autonomy include the cockpits of future spacecraft such as the Mars Exploration Vehicle, and space-based control centers such as a Lunar Base Command and Control Center. Furthermore, this paper will evaluate the requirements, available technology, and roadmap to enable full operational implementation of onboard System Health Management, Mission Planning/re-planning, Autonomous Task/Command Execution, and Human Computer Interface applications. The technology topics covered by the paper include enabling technology to perform Intelligent Caution and Warning, where the systems provides directly actionable data for human understanding and response to failures, task automation applications that automate nominal and Off-nominal task execution based on human input or integrated health state-derived conditions. Shifting from Systems to Mission Management functions, we discuss the role of automated planning applications (tactical planning) on-board, which receive data from the other cockpit automation systems and evaluate the mission plan against the dynamic systems and mission states and events, to provide the crew with capabilities that enable them to understand, change, and manage the timeline of their mission. Lastly, we discuss the role of advanced human interface technologies that organize and provide the system md mission information to the crew in ways that maximize their situational awareness and ability to provide oversight and control of aLl the automated data and functions.
Closing unprofitable services: ethical issues and management responses.
Summers, James W
1985-01-01
Closing unprofitable services often requires as much analysis, public relations, marketing, and planning as any expansion. Further, issues about ethics, indigents, and the hospital mission force the consideration of values explicitly if a marketing fiasco is to be avoided. By integrating values analysis with more traditional management tasks, the challenges of service closure can be converted into opportunities to demonstrate how your institution has met or exceeded its ethical obligations. A case involving OB is developed to show how ethical and management issues blend into one another. Specific strategies for consensus building and marketing of the legitimacy of the hospital's position are given. Institutional ethics committees are one primary mechanism for developing a plan to benefit from unpleasant decisions.
Enhanced project management tool
NASA Technical Reports Server (NTRS)
Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)
2012-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.
Byrd, Dana L.; Reuther, Erin T.; McNamara, Joseph P. H.; DeLucca, Teri L.; Berg, William K.
2015-01-01
The current study examines similarity or disparity of a frontally mediated physiological response of mental effort among multiple executive functioning tasks between children and adults. Task performance and phasic heart rate variability (HRV) were recorded in children (6 to 10 years old) and adults in an examination of age differences in executive functioning skills during periods of increased demand. Executive load levels were varied by increasing the difficulty levels of three executive functioning tasks: inhibition (IN), working memory (WM), and planning/problem solving (PL). Behavioral performance decreased in all tasks with increased executive demand in both children and adults. Adults’ phasic high frequency HRV was suppressed during the management of increased IN and WM load. Children’s phasic HRV was suppressed during the management of moderate WM load. HRV was not suppressed during either children’s or adults’ increasing load during the PL task. High frequency phasic HRV may be most sensitive to executive function tasks that have a time-response pressure, and simply requiring performance on a self-paced task requiring frontal lobe activation may not be enough to generate HRV responsitivity to increasing demand. PMID:25798113
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
SOLON: An autonomous vehicle mission planner
NASA Technical Reports Server (NTRS)
Dudziak, M. J.
1987-01-01
The State-Operator Logic Machine (SOLON) Planner provides an architecture for effective real-time planning and replanning for an autonomous vehicle. The highlights of the system, which distinguish it from other AI-based planners that have been designed previously, are its hybrid application of state-driven control architecture and the use of both schematic representations and logic programming for the management of its knowledge base. SOLON is designed to provide multiple levels of planning for a single autonomous vehicle which is supplied with a skeletal, partially-specified mission plan at the outset of the vehicle's operations. This mission plan consists of a set of objectives, each of which will be decomposable by the planner into tasks. These tasks are themselves comparatively complex sets of actions which are executable by a conventional real-time control system which does not perform planning but which is capable of making adjustments or modifications to the provided tasks according to constraints and tolerances provided by the Planner. The current implementation of the SOLON is in the form of a real-time simulation of the Planner module of an Intelligent Vehicle Controller (IVC) on-board an autonomous underwater vehicle (AUV). The simulation is embedded within a larger simulator environment known as ICDS (Intelligent Controller Development System) operating on a Symbolics 3645/75 computer.
Implementation plan for underground waste storage tank surveillance and stabilization improvements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dukelow, G.T.; Maupin, V.D.; Mihalik, L.A.
1989-04-01
Several studies have addressed the need to upgrade the methods currently used for surveillance of underground waste storage tanks, particularly single-shell tanks (SST), which are susceptible to leaks and intrusions. Fifty tasks were proposed to enhance the existing surveillance program; however, prudent budget management dictates that only the tasks with the highest potential for success be selected and funded. This plan identifies fourteen inexpensive improvements that may be implemented in less than two years. Recent developments stress the need to complete interim stabilization of these tanks more quickly than now budgeted and to identify methods to salvage or eliminate themore » interstitial liquid left behind after saltwell jet-pumping. The plan calls for the use of available resources to remove saltwell liquid from SSTs as rapidly as possible rather than committing to new surveillance technologies that might not lead to near-term improvements. This plan describes the selection criteria and provides cost estimates and schedules for implementing the recommendations of the task forces. The proposed improvements result in completion of jet-pumping in FY 1994, two years ahead of the current FY 1996 milestone. While the accelerated plan requires more funding in the early years, the total cost will be the same as completing the work in FY 1996.« less
Development and demonstration of an on-board mission planner for helicopters
NASA Technical Reports Server (NTRS)
Deutsch, Owen L.; Desai, Mukund
1988-01-01
Mission management tasks can be distributed within a planning hierarchy, where each level of the hierarchy addresses a scope of action, and associated time scale or planning horizon, and requirements for plan generation response time. The current work is focused on the far-field planning subproblem, with a scope and planning horizon encompassing the entire mission and with a response time required to be about two minutes. The far-feld planning problem is posed as a constrained optimization problem and algorithms and structural organizations are proposed for the solution. Algorithms are implemented in a developmental environment, and performance is assessed with respect to optimality and feasibility for the intended application and in comparison with alternative algorithms. This is done for the three major components of far-field planning: goal planning, waypoint path planning, and timeline management. It appears feasible to meet performance requirements on a 10 Mips flyable processor (dedicated to far-field planning) using a heuristically-guided simulated annealing technique for the goal planner, a modified A* search for the waypoint path planner, and a speed scheduling technique developed for this project.
Valls-Serrano, Carlos; Caracuel, Alfonso; Verdejo-Garcia, Antonio
2016-08-01
We have previously shown that Goal Management Training+Mindfulness Meditation (GMT+MM) improves executive functions in polysubstance users enrolled in outpatient treatment. The aim of this study was to establish if GMT+MM has similar positive effects on executive functions in polysubstance users in residential treatment, and if executive functions' gains transfer to more ecologically valid goal-oriented tasks. Thirty-two polysbustance users were randomly allocated to eight weeks of GMT+MM (n=16) or control, i.e., no-intervention (n=16); both groups received treatment as usual. Outcome measures included performance in laboratory tasks of basic and complex executive functions (i.e., basic: working memory and inhibition; complex: planning and self-regulation) and in an ecological task of goal-directed behavior (the Multiple Errands Test - contextualized version, MET-CV) measured post-interventions. Results showed that GMT+MM was superior to control in improving basic measures of working memory (Letter-number sequencing; F=4.516, p=0.049) and reflection impulsivity (Information Sampling Test; F=6.217, p=0.018), along with initial thinking times during planning (Zoo Map Test; F=8.143, p=0.008). In addition, GMT+MM was superior to control in improving performance in the MET-CV (task failures; F=8.485, p=0.007). Our findings demonstrate that GMT+MM increases reflective processes and the achievement of goals in daily activities, furthermore ecological test can detects changes easily than laboratory tasks. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Report of the LSPI/NASA Workshop on Lunar Base Methodology Development
NASA Technical Reports Server (NTRS)
Nozette, Stewart; Roberts, Barney
1985-01-01
Groundwork was laid for computer models which will assist in the design of a manned lunar base. The models, herein described, will provide the following functions for the successful conclusion of that task: strategic planning; sensitivity analyses; impact analyses; and documentation. Topics addressed include: upper level model description; interrelationship matrix; user community; model features; model descriptions; system implementation; model management; and plans for future action.
Planning and Resource Management in an Intelligent Automated Power Management System
NASA Technical Reports Server (NTRS)
Morris, Robert A.
1991-01-01
Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.
He, Ji; Dai, Xinbin; Zhao, Xuechun
2007-01-01
Background BLAST searches are widely used for sequence alignment. The search results are commonly adopted for various functional and comparative genomics tasks such as annotating unknown sequences, investigating gene models and comparing two sequence sets. Advances in sequencing technologies pose challenges for high-throughput analysis of large-scale sequence data. A number of programs and hardware solutions exist for efficient BLAST searching, but there is a lack of generic software solutions for mining and personalized management of the results. Systematically reviewing the results and identifying information of interest remains tedious and time-consuming. Results Personal BLAST Navigator (PLAN) is a versatile web platform that helps users to carry out various personalized pre- and post-BLAST tasks, including: (1) query and target sequence database management, (2) automated high-throughput BLAST searching, (3) indexing and searching of results, (4) filtering results online, (5) managing results of personal interest in favorite categories, (6) automated sequence annotation (such as NCBI NR and ontology-based annotation). PLAN integrates, by default, the Decypher hardware-based BLAST solution provided by Active Motif Inc. with a greatly improved efficiency over conventional BLAST software. BLAST results are visualized by spreadsheets and graphs and are full-text searchable. BLAST results and sequence annotations can be exported, in part or in full, in various formats including Microsoft Excel and FASTA. Sequences and BLAST results are organized in projects, the data publication levels of which are controlled by the registered project owners. In addition, all analytical functions are provided to public users without registration. Conclusion PLAN has proved a valuable addition to the community for automated high-throughput BLAST searches, and, more importantly, for knowledge discovery, management and sharing based on sequence alignment results. The PLAN web interface is platform-independent, easily configurable and capable of comprehensive expansion, and user-intuitive. PLAN is freely available to academic users at . The source code for local deployment is provided under free license. Full support on system utilization, installation, configuration and customization are provided to academic users. PMID:17291345
Evaluation of the Trajectory Operations Applications Software Task (TOAST)
NASA Technical Reports Server (NTRS)
Perkins, Sharon; Martin, Andrea; Bavinger, Bill
1990-01-01
The Trajectory Operations Applications Software Task (TOAST) is a software development project under the auspices of the Mission Operations Directorate. Its purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle program. As an Application Manager, TOAST provides an isolation layer between the underlying Unix operating system and the series of user programs. It provides two main services: a common interface to operating system functions with semantics appropriate for C or FORTRAN, and a structured input and output package that can be utilized by user application programs. In order to evaluate TOAST as an Application Manager, the task was to assess current and planned capabilities, compare capabilities to functions available in commercially-available off the shelf (COTS) and Flight Analysis Design System (FADS) users for TOAST implementation. As a result of the investigation, it was found that the current version of TOAST is well implemented and meets the needs of the real-time users. The plans for migrating TOAST to the X Window System are essentially sound; the Executive will port with minor changes, while Menu Handler will require a total rewrite. A series of recommendations for future TOAST directions are included.
Artificial intelligence - New tools for aerospace project managers
NASA Technical Reports Server (NTRS)
Moja, D. C.
1985-01-01
Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.
NASA Astrophysics Data System (ADS)
Bravo-Torija, Beatriz; Jiménez-Aleixandre, María-Pilar
2012-01-01
Sustainable management of marine resources raises great challenges. Working with this socio-scientific issue in the classroom requires students to apply complex models about energy flow and trophic pyramids in order to understand that food chains represent transfer of energy, to construct meanings for sustainable resources management through discourse, and to connect them to actions and decisions in a real-life context. In this paper we examine the process of elaboration of plans for resources management in a marine ecosystem by 10th grade students (15-16 year) in the context of solving an authentic task. A complete class ( N = 14) worked in a sequence about ecosystems. Working in small groups, the students made models of energy flow and trophic pyramids, and used them to solve the problem of feeding a small community for a long time. Data collection included videotaping and audiotaping of all of the sessions, and collecting the students' written productions. The research objective is to examine the process of designing a plan for sustainable resources management in terms of the discursive moves of the students across stages in contextualizing practices, or different degrees of complexity (Jiménez-Aleixandre & Reigosa International Journal of Science Education, 14(1): 51-61 2006), understood as transformations from theoretical statements to decisions about the plan. The analysis of students' discursive moves shows how the groups progressed through stages of connecting different models, between them and with the context, in order to solve the task. The challenges related to taking this sustainability issue to the classroom are discussed.
The indexed time table approach for planning and acting
NASA Technical Reports Server (NTRS)
Ghallab, Malik; Alaoui, Amine Mounir
1989-01-01
A representation is discussed of symbolic temporal relations, called IxTeT, that is both powerful enough at the reasoning level for tasks such as plan generation, refinement and modification, and efficient enough for dealing with real time constraints in action monitoring and reactive planning. Such representation for dealing with time is needed in a teleoperated space robot. After a brief survey of known approaches, the proposed representation shows its computational efficiency for managing a large data base of temporal relations. Reactive planning with IxTeT is described and exemplified through the problem of mission planning and modification for a simple surveying satellite.
2005 8th Annual Systems Engineering Conference. Volume 1, Tuesday
2005-10-27
Services NCES Discovery Services Federated Search Denotes interface Service NCCP Oktoberfest 2004 101 Task: Global Strike Mission Planning NCCP Oktoberfest...Enterprise Service Management Security Services NCES Discovery Services Federated Search Service Test, cert and accreditation needs to be focused on small
Theresa K. Burcsu; Joshua S. Halofsky; Simon A. Bisrat; Treg A. Christopher; Megan K. Creutzburg; Emilie B. Henderson; Miles A. Hemstrom; F. Jack Triepke; Melissa Whitman
2014-01-01
Land management planning at broad scales requires integrative techniques to understand and synthesize the effects of different land management activities and address socioeconomic and conservation concerns. The Integrated Landscape Assessment Project was developed to support the vital but complex task of broadscale integration of information to assess ecological...
Planning in context: A situated view of children's management of science projects
NASA Astrophysics Data System (ADS)
Marshall, Susan Katharine
This study investigated children's collaborative planning of a complex, long-term software design project. Using sociocultural methods, it examined over time the development of design teams' planning negotiations and tools to document the coconstruction of cultural frameworks to organize teams' shared understanding of what and how to plan. Results indicated that student teams developed frameworks to address a set of common planning functions that included design planning, project metaplanning (things such as division of labor or sharing of computer resources) and team collaboration management planning. There were also some between-team variations in planning frameworks, within a bandwidth of options. Teams engaged in opportunistic planning, which reflected shifts in strategies in response to new circumstances over time. Team members with past design project experience ("oldtimers") demonstrated the transfer of their planning framework to the current design task, and they supported the developing participation of "newcomers." Teams constructed physical tools (e.g. planning boards) that acted as visual representations of teams' planning frameworks, and inscriptions of team thinking. The assigned functions of the tools also shifted over time with changing project circumstances. The discussion reexamines current approaches to the study of planning and discusses their educational implications.
NASA Astrophysics Data System (ADS)
Feeley, J.; Zajic, J.; Metcalf, A.; Baucom, T.
2009-12-01
The National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP) Calibration and Validation (Cal/Val) team is planning post-launch activities to calibrate the NPP sensors and validate Sensor Data Records (SDRs). The IPO has developed a web-based data collection and visualization tool in order to effectively collect, coordinate, and manage the calibration and validation tasks for the OMPS, ATMS, CrIS, and VIIRS instruments. This tool is accessible to the multi-institutional Cal/Val teams consisting of the Prime Contractor and Government Cal/Val leads along with the NASA NPP Mission team, and is used for mission planning and identification/resolution of conflicts between sensor activities. Visualization techniques aid in displaying task dependencies, including prerequisites and exit criteria, allowing for the identification of a critical path. This presentation will highlight how the information is collected, displayed, and used to coordinate the diverse instrument calibration/validation teams.
Nøhr, C; Bygholm, A; Hejlesen, O
1998-06-01
Education is essentially giving people new skills and qualifications to fulfil certain tasks. In planning and managing educational programmes it is crucial to know what skills and what qualifications are needed to carry out the tasks in question, not to mention the importance of knowing what tasks are relevant to carry out. The programme in health informatics at Aalborg University produces health informatics professionals. The students are developing skills in solving informatics problems in health care organisations. The programme has been running for 3 years now and to maintain the perception of the aim for the programme a number of activities have been launched. In the following, the programme will be presented, the activities to obtain information on how to keep the programme targeted and updated will be described and the changes that are going to be introduced will be outlined.
Troyer, Caitlin M; Gerber, Leah R
2015-10-01
The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning. © 2015 Society for Conservation Biology.
Automated personnel data base system specifications, Task V. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartley, H.J.; Bocast, A.K.; Deppner, F.O.
1978-11-01
The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.
Space station common module power system network topology and hardware development
NASA Technical Reports Server (NTRS)
Landis, D. M.
1985-01-01
Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.
Enhancing Brigade Combat Team Adaptability
2010-06-11
S3 DUTIES AND RESPONSIBILITIES S3 SGM S3 Operations Fires and EffectsS3 Training S3 Plans CYCLIC TNG GUIDANCE UNIT ASSESSMENT APPROVE DTU TOC/TAC SET...UP TEAM LEADER COURSE BOC MTT Requests/Tracking MTT OVERSIGHT TMPs RECLAMAS LOE OVERSIGHT MONITOR DIV O&I DTU /Task Management TOP 5 CALENDAR...referenced in Chapter 5 to this thesis. SLIDE: 1FOR OFFICIAL USE ONLY OPERATIONAL TASKS/SYSTEMS BOC Shift Change MONITOR DIV O&I DTU SDO BRIEFING
Dörr, Harald; Meineke, Viktor
2012-10-01
Radiation accidents are fortunately infrequent occurrences, but since their consequences can be very serious as in the Chernobyl and the Fukushima nuclear accidents, medical management of radiation accidents is of great importance. Besides several other tasks, medical management of radiation accidents is one of the key tasks of the Bundeswehr Institute of Radiobiology. Within a Task Force Unit for medical chemical, biological, radiological, and nuclear (CBRN) Defense, the institute provides designated personnel who will perform clinical investigations on the scene and will liaise with the institute, where different methods for biological dosimetry and dose reconstruction will be performed. The most important aspects of efficient medical management of radiation accidents are diagnosis of radiation-induced health damage, determination of the cause, dealing with contamination/incorporation, pathophysiological and therapeutic principles, preparatory planning, national and international cooperation and training. Military and non-military institutions have to work closely together when it comes to radiation accidents and since national resources are limited and could be exhausted, international networks can help to ensure medical treatment for radiation accident victims.
A Human-in-the-Loop Evaluation of Multi-Sector Planning in Mixed Equipage Airspace (MSP III)
NASA Technical Reports Server (NTRS)
Smith, Nancy; Prevot, Tom; Kessell, Angela; Homola, Jeff; Lee, Hwasoo; Mercer, Joey; Brasil, Connie; Mainini, Matt; Lee, Paul
2011-01-01
A human-in-the-loop (HITL) simulation was conducted in May 2010 to determine the feasibility and value 01 conducting multi-sector planning (MSP) operations in a mixed equipage environment. Aircraft were categorized as equipped or unequipped based on the presence or absence of an air-ground data communications (Data Comm) capability for receiving auto-loadable clearances and transfer of communication messages from the air navigation service provider (ANSP). The purpose of the study was to determine the feasibility and possible benefits of introducing multi-sector planning in a mixed equipage context, or whether Data Comm equipage was required for MSP operations. Each test scenario presented one of three different equipage levels to the controllers (10%, 50% or 90% equipped aircraft), so that the operational impact of different equipage levels could be observed. Operational feasibility assessment addressed two related questions: (1) are MSP operations feasible for unequipped aircraft, and (2) are they feasible in a mixed equipage context. Similarly, two categories of potential benefits were explored: (1) system performance improvements (e.g., throughput, workload) associated with MSP at different equipage levels, and (2) the possibility of providing differential service for equipage through MSP operations. Tool requirements (for both planning and controller stations), as well as planning and coordination procedures - within facility (traffic management unit/operational area) and within sector (R-Side/D-Side) - were two other topics addressed in the study. Overall, results suggested that MSP operations were feasible in a mixed equipage environment and that the tools were effective with both equipped and unequipped aircraft. Using the MSP tools, traffic management coordinators were able to manage controller task load, effectively balancing throughput with complexity and controller task load at each of the three equipage levels tested.
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2010 CFR
2010-10-01
... related performance budgets, resources, and schedules. It should provide a mutual understanding of the inherent risks in offerors'/contractors' performance plans and the underlying management control systems... objectives of the scope of work; (2) Adequacy of the time allocated for performing the defined tasks to...
ERIC Educational Resources Information Center
Good, Rebecca
2008-01-01
Instructional leadership is defined in a broader yet more intense definition today than it was 20 years ago. Originally, the role involved traditional tasks such as setting clear goals, allocating resources to instruction, managing the curriculum, monitoring lesson plans, and evaluating teachers. Today it includes much deeper involvement in the…
Professional Development and TransLink[R]. Final Report.
ERIC Educational Resources Information Center
Kuhn, Beverly T.; Jasek, Deborah
This report covers one segment of a larger professional development program for transportation professionals that addresses the need to develop a larger cadre of transportation professionals capable of designing, planning, managing, operating, and maintaining the transportation infrastructure nationwide. Three specific tasks were undertaken and…
ERIC Educational Resources Information Center
Bruley, Karina
1996-01-01
Provides a checklist of considerations for installing document image processing with an electronic document management system. Other topics include scanning; indexing; the image file life cycle; benefits of imaging; document-driven workflow; and planning for workplace changes like postsorting, creating a scanning room, redeveloping job tasks and…
Concurrent planning and execution for a walking robot
NASA Astrophysics Data System (ADS)
Simmons, Reid
1990-07-01
The Planetary Rover project is developing the Ambler, a novel legged robot, and an autonomous software system for walking the Ambler over rough terrain. As part of the project, we have developed a system that integrates perception, planning, and real-time control to navigate a single leg of the robot through complex obstacle courses. The system is integrated using the Task Control Architecture (TCA), a general-purpose set of utilities for building and controlling distributed mobile robot systems. The walking system, as originally implemented, utilized a sequential sense-plan-act control cycle. This report describes efforts to improve the performance of the system by concurrently planning and executing steps. Concurrency was achieved by modifying the existing sequential system to utilize TCA features such as resource management, monitors, temporal constraints, and hierarchical task trees. Performance was increased in excess of 30 percent with only a relatively modest effort to convert and test the system. The results lend support to the utility of using TCA to develop complex mobile robot systems.
Plans and status of the NASA-Lewis Research Center wind energy project
NASA Technical Reports Server (NTRS)
Thomas, R.; Puthoff, R.; Savino, J.; Johnson, W.
1975-01-01
Wind energy is investigated as a source of energy. The wind energy program that is managed by the NASA-Lewis Research Center is described. The Lewis Research Center's Wind Power Office, its organization, plans, and status are discussed. Major elements of the wind power project included are: an experimental 100 kW wind-turbine generator; first generation industry-built and user-operated wind turbine generators; and supporting research and technology tasks.
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
The Impact of Time Management on Students’ Academic Achievement
NASA Astrophysics Data System (ADS)
Razali, S. N. A. M.; Rusiman, M. S.; Gan, W. S.; Arbin, N.
2018-04-01
Time management is very important and it may actually affect individual’s overall performance and achievements. Students nowadays always commented that they do not have enough time to complete all the tasks assigned to them. In addition, a university environment’s flexibility and freedom can derail students who have not mastered time management skills. Therefore, the aim of this study is to determine the relationship between the time management and academic achievement of the students. The factor analysis result showed three main factors associated with time management which can be classified as time planning, time attitudes and time wasting. The result also indicated that gender and races of students show no significant differences in time management behaviours. While year of study and faculty of students reveal the significant differences in the time management behaviours. Meanwhile, all the time management behaviours are significantly positively related to academic achievement of students although the relationship is weak. Time planning is the most significant correlated predictor.
ALARA and planning of interventions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rocaboy, A.
1995-03-01
The implementation of ALARA programs implies integration of radiation protection criterion at all stages of outage management. Within the framework of its ALARA policy, Electricide de France (EDF) has given an incentive to all of its nuclear power plants to develop {open_quotes}good practices{close_quotes} in this domain, and to exchange their experience by the way of a national feed back file. Among the developments in the field of outage organization, some plants have focused on the planning stage of activities because of its influence on the radiological conditions of interventions and on the good succession of tasks within the radiological controlledmore » areas. This paper presents the experience of Chinon nuclear power plant. At Chinon, we are pursuing this goal through careful outage planning. We want the ALARA program during outages to be part of the overall maintenance task planning. This planning includes the provision of the availability of every safety-related component, and of the variations of water levels in hthereactor and steam generators to take advantage of the shield created by the water. We have developed a computerized data base with the exact position of all the components in the reactor building in order to avoid unnecessary interactions between different tasks performed in the same room. A common language between Operation and Maintenance had been established over the past years, using {open_quotes}Milestones and Corridors{close_quotes}. A real time dose rate counting system enables the Radiation Protection (RP) Department to do an accurate and efficient follow up during the outage for all the {open_quotes}ALARA{close_quotes} maintenance tasks.« less
[The case manager--from words to deeds?].
Lindegaard, Birthe Rosenkrantz; Qvist, Peter
2010-04-19
Allocation of a case manager is now mandatory for both in- and outpatients in Denmark. Case manager allocation is reported quarterly to the regions and results are generally satisfying. Knowledge about fulfillment of the case manager role is, however, sparse. This study aims to examine the degree of fulfillment of the case manager role for a sample of inpatients. Two medical and two surgical wards participated. Patients were interviewed in relation to discharge while staff assigned as case managers completed a survey. Both patients and case managers answered questions regarding the defined roles as case managers: Planning/coordination, continuous information and discharge planning. 107 of 125 eligible patients were interviewed. Only 25 declared themselves informed about the allocation of a case manager. The patients' assessment of the service provided by the staff in relation to case manager tasks was generally good, but the services were seldom provided by the named case manager. 22% of patients did not experience continuous information, while only 13% did not experience a generally coherent stay in hospital. 110 case managers completed the survey. Less than half felt themselves well informed about the case manager role. Only a few case managers feel that they succeed in fulfilling the role, particularly regarding the participation in discharge planning. There seems to be a need for a targeted effort to improve the conditions for case managers in Danish hospitals in order to meet the intentions of this initiative.
Wienand, I; Nolting, U; Kistemann, T
2009-01-01
Following international developments and the new WHO Drinking Water Guidelines (WHO 2004) a process-orientated concept for risk, monitoring and incident management has been developed and implemented in this study. The concept will be reviewed with special consideration for resource protection (first barrier of the multi-barrier system) and in turn, for the Water Safety Plan (WSP) which adequately considers-beyond the current framework of legal requirements-possible new hygienic-microbiologically relevant risks (especially emerging pathogens) for the drinking water supply. The development of a WSP within the framework of risk, monitoring and incident management includes the application of Geographical Information Systems (GIS). In the present study, GIS was used for visualization and spatial analysis in decisive steps in the WSP. The detailed process of GIS-supported implementation included the identification of local participants and their tasks and interactions as an essential part of risk management. A detailed ecological investigation of drinking water conditions in the catchment area was conducted in addition to hazard identification, risk assessment and the monitoring of control measures. The main task of our study was to find out in which steps of the WSP the implementation of GIS could be integrated as a useful, and perhaps even an essential tool.
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
Air Force Tech Order Management System (AFTOMS). Automation Plan-Final Report. Version 1.0
DOT National Transportation Integrated Search
1988-02-01
Computer aided Acquisition and Logistics Support (CALS) is a Department of Defense (DoD) program designed to improve weapon systems support through digital automation. In June 1985, the joint industry/DoD Task Force on CALS issued a five volume repor...
Quantitative software models for the estimation of cost, size, and defects
NASA Technical Reports Server (NTRS)
Hihn, J.; Bright, L.; Decker, B.; Lum, K.; Mikulski, C.; Powell, J.
2002-01-01
The presentation will provide a brief overview of the SQI measurement program as well as describe each of these models and how they are currently being used in supporting JPL project, task and software managers to estimate and plan future software systems and subsystems.
1984-05-01
61[- ~%.- ~ * ’.. e. ,* .C . . -. . %~*, S . ** P~~ "’K . 5, FOREWORD This investigation was performed as a reimbursable project for the Hunts...Installation Overhead Rates to EA,CA Reimbursable Rates 102 **53 Comparison of Shop Costs 104 54 Cost of Equipment Acquisition (Replacement Value and Annual...B3 Task "C"--Develop the Detailed Financial Management Plan To Include Establishment of a Revolving Fund for Reimbursement 143 Z B4 Task "D"--Develop
Chanu, A; Caron, A; Ficheur, G; Berkhout, C; Duhamel, A; Rochoy, M
2018-05-01
A general practitioner's office is an economic unit where task delegation is an essential component in improving the quality and performance of work. To classify the preferences of general practitioners regarding the delegation of medical-administrative tasks to assistant medical-social secretaries. Conjoint analysis was applied to a random sample of 175 general practitioners working in metropolitan France. Ten scenarios were constructed based on seven attributes: training for medical secretaries, logistical support during the consultation, delegation of management planning, medical records, accounting, maintenance, and taking initiative on the telephone. A factorial design was used to reduce the number of scenarios. Physicians' socio-demographic variables were collected. One hundred and three physicians responded and the analysis included 90 respondents respecting the transitivity of preferences hypothesis. Perceived difficulty was scored 2.8 out of 5. The high rates of respondents (59%; 95% CI [51.7-66.3]) and transitivity (87.5%; 95% CI [81.1-93.9]) showed physicians' interest in this topic. Delegation of tasks concerning management planning (OR=2.91; 95% CI [2.40-13.52]) and medical records (OR=1.88; 95% CI [1.56-2.27]) were the two most important attributes for physicians. The only variable for which the choice of a secretary was not taken into account was logistical support. This is a first study examining the choices of general practitioners concerning the delegation of tasks to assistants. These findings are helpful to better understand the determinants of practitioners' choices in delegating certain tasks or not. They reveal doctors' desire to limit their ancillary tasks in order to favor better use of time for "medical" tasks. They also expose interest for training medical secretaries and widening their field of competence, suggesting the emergence of a new professional occupation that could be called "medical assistant". Copyright © 2018 Elsevier Masson SAS. All rights reserved.
Mission planning for autonomous systems
NASA Technical Reports Server (NTRS)
Pearson, G.
1987-01-01
Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.
2013-01-01
Background Many brain-injured patients referred for outpatient rehabilitation have executive deficits, notably difficulties with planning, problem-solving and goal directed behaviour. Goal Management Training (GMT) has proven to be an efficacious cognitive treatment for these problems. GMT entails learning and applying an algorithm, in which daily tasks are subdivided into multiple steps. Main aim of the present study is to examine whether using an errorless learning approach (preventing the occurrence of errors during the acquisition phase of learning) contributes to the efficacy of Goal Management Training in the performance of complex daily tasks. Methods/Design The study is a double blind randomized controlled trial, in which the efficacy of Goal Management Training with an errorless learning approach will be compared with conventional Goal Management Training, based on trial and error learning. In both conditions 32 patients with acquired brain injury of mixed etiology will be examined. Main outcome measure will be the performance on two individually chosen everyday-tasks before and after treatment, using a standardized observation scale and goal attainment scaling. Discussion This is the first study that introduces errorless learning in Goal Management Training. It is expected that the GMT-errorless learning approach will improve the execution of complex daily tasks in brain-injured patients with executive deficits. The study can contribute to a better treatment of executive deficits in cognitive rehabilitation. Trial registration (Dutch Trial Register): http://NTR3567 PMID:23786651
Management Study of the Office of the Secretary of Defense.
1987-10-01
work . If DoD is unable to acquire an individual with similar broad experience in both the C3 and Intelligence areas, consideration should be given to...ORGANIZATION (If applicable) N/A N/A 8c. ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS PROGRAM N PROJECT TASK WORK UNIT ELMN...political-military assinumptions, apd improve civilian control over operations planning. Concerns about the sensitivity of the plans should be balanced
Development of a Mixed Scanning Interactive System for Decision Support.
1984-07-01
strategic planning, management control , and i I gineering design of information systems for planning and deci- operational control . The method-of-evidence...Nvstrom 13351 _ . "The functional equivalence of prohlem soiing skills." and W I. Starbuck. Eds.. llandhoot of Or’ani:ational Design . (’,gnitite P’ iihol...concerns make design means do we necessarily learn well from ex- and application of the aforementioned adju- perience [10]. vants a non routine task
Literature review on medical incident command.
Rimstad, Rune; Braut, Geir Sverre
2015-04-01
It is not known what constitutes the optimal emergency management system, nor is there a consensus on how effectiveness and efficiency in emergency response should be measured or evaluated. Literature on the role and tasks of commanders in the prehospital emergency services in the setting of mass-casualty incidents has not been summarized and published. This comprehensive literature review addresses some of the needs for future research in emergency management through three research questions: (1) What are the basic assumptions underlying incident command systems (ICSs)? (2) What are the tasks of ambulance and medical commanders in the field? And (3) How can field commanders' performances be measured and assessed? A systematic literature search in MEDLINE, PubMed, PsycINFO, Embase, Cochrane Central Register of Controlled Trials, Cochrane Library, ISI Web of Science, Scopus, International Security & Counter Terrorism Reference Center, Current Controlled Trials, and PROSPERO covering January 1, 1990 through March 1, 2014 was conducted. Reference lists of included literature were hand searched. Included papers were analyzed using Framework synthesis. The literature search identified 6,049 unique records, of which, 76 articles and books where included in qualitative synthesis. Most ICSs are described commonly as hierarchical, bureaucratic, and based on military principles. These assumptions are contested strongly, as is the applicability of such systems. Linking of the chains of command in cooperating agencies is a basic difficulty. Incident command systems are flexible in the sense that the organization may be expanded as needed. Commanders may command by direction, by planning, or by influence. Commanders' tasks may be summarized as: conducting scene assessment, developing an action plan, distributing resources, monitoring operations, and making decisions. There is considerable variation between authors in nomenclature and what tasks are included or highlighted. There are no widely acknowledged measurement tools of commanders' performances, though several performance indicators have been suggested. The competence and experience of the commanders, upon which an efficient ICS has to rely, cannot be compensated significantly by plans and procedures, or even by guidance from superior organizational elements such as coordination centers. This study finds that neither a certain system or structure, or a specific set of plans, are better than others, nor can it conclude what system prerequisites are necessary or sufficient for efficient incident management. Commanders need to be sure about their authority, responsibility, and the functional demands posed upon them.
Effects of Planning on Task Load, Knowledge, and Tool Preference: A Comparison of Two Tools
ERIC Educational Resources Information Center
Bonestroo, Wilco J.; de Jong, Ton
2012-01-01
Self-regulated learners are expected to plan their own learning. Because planning is a complex task, it is not self-evident that all learners can perform this task successfully. In this study, we examined the effects of two planning support tools on the quality of created plans, planning behavior, task load, and acquired knowledge. Sixty-five…
Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J
2007-03-01
To assist high school and college athletic programs prepare for and respond to sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. SCA is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishing an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of onsite responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.
Management of the aging of critical safety-related concrete structures in light-water reactor plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Naus, D.J.; Oland, C.B.; Arndt, E.G.
1990-01-01
The Structural Aging Program has the overall objective of providing the USNRC with an improved basis for evaluating nuclear power plant safety-related structures for continued service. The program consists of a management task and three technical tasks: materials property data base, structural component assessment/repair technology, and quantitative methodology for continued-service determinations. Objectives, accomplishments, and planned activities under each of these tasks are presented. Major program accomplishments include development of a materials property data base for structural materials as well as an aging assessment methodology for concrete structures in nuclear power plants. Furthermore, a review and assessment of inservice inspection techniquesmore » for concrete materials and structures has been complete, and work on development of a methodology which can be used for performing current as well as reliability-based future condition assessment of concrete structures is well under way. 43 refs., 3 tabs.« less
ERIC Educational Resources Information Center
Tatsuki, Donna
Popular films can be used successfully in a wide range of language, content, and culture classes. Creating support materials in order to use a movie in such a class is an enormous task, but with careful planning it can be broken into four manageable components: contemplation, selection, segmentation, and construction. This brief paper provides a…
Tailoring Small IT Projects in the Project Planning Phase
ERIC Educational Resources Information Center
Mulhearn, Michael F.
2011-01-01
Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…
Chapter 4 - The LANDFIRE Prototype Project reference database
John F. Caratti
2006-01-01
This chapter describes the data compilation process for the Landscape Fire and Resource Management Planning Tools Prototype Project (LANDFIRE Prototype Project) reference database (LFRDB) and explains the reference data applications for LANDFIRE Prototype maps and models. The reference database formed the foundation for all LANDFIRE tasks. All products generated by the...
Planning and Preparing for Training in Reserve Component Units
2002-04-01
Maneuver should be emphasized over gunnery because maneuver is more difficult. • BCBST (brigade command and battle staff training) can be the funding ... model for delivery of management training to Guard company and battalion members. • Training tasks should be spread out over a longer cycle. The year is
78 FR 11670 - Notice of ACHP Quarterly Business Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... Preservation Awards IV. Chairman's Report V. ACHP Management Issues A. ACHP FY 2013 and 2014 Budget B. Alumni Foundation Report VI. Historic Preservation Policy and Programs A. ACHP Plan To Support the United Nations... War to Civil Rights Initiative F. Future Directions for the ACHP in Sustainability G. Rightsizing Task...
Making Schools Safe: The Role of the Modern Business Officer.
ERIC Educational Resources Information Center
Stephens, Ronald D.
1990-01-01
School business officials are held responsible for school safety. After conducting a school security audit, the following strategies are recommended: establishing a local school security task force; forming a comprehensive crisis management plan; establishing a school communication network; and providing school staff with inservice training on…
Jail Management. Book 6: Jail Planning.
ERIC Educational Resources Information Center
Blumer, Alice Howard
The course is for independent study by jail officers who must learn that, in addition to their rountine tasks, they must be prepared to be well-trained, responsible professionals, making important decisions and avoiding the mistakes and disproven beliefs of the past. The jail administrator must continually wrestle with the problems of conflicting…
A Blueprint for Student Recruitment
ERIC Educational Resources Information Center
Chamberlain, Frank M.
1977-01-01
A marketing plan from the Young Presidents' Organization Task Force is offered: define the market; identify the target student; clarify the college selection process; assess the competition; define the college in terms of market needs; develop a recruiting strategy; develop objectives for the year; spell out the tactics; and manage for results.…
Project Administration Techniques for Successful Classroom Collaborative Writing.
ERIC Educational Resources Information Center
Kryder, LeeAnne Giannone
1991-01-01
Focuses on the collaborative writing done for a large report or proposal over a period of several weeks or months in a business writing course. Discusses short-term writing projects and nonwriting tasks for project administration, meeting management, student/instructor conference, project planning and time estimates, and oral presentations. (PRA)
Clarke, Damian Luiz
2015-01-03
Improving the delivery of efficient and effective surgical care in rural South Africa is a mammoth task bedevilled by conflict between the stakeholders, who include rural doctors, surgeons, ancillary staff, researchers, educators and administrators. Management training is not part of most medical school curricula, yet as they progress in their careers, many clinicians are required to manage a health system and find the shift from caring for individual patients to managing a complex system difficult. Conflict arises when management-type interventions are imposed in a top-down manner on surgical staff suspicious of an unfamiliar field of study. Another area of conflict concerns the place of surgical research. Researchers are often accused of not being sufficiently focused on or concerned about the tasks of service delivery. This article provides an overview of management theory and describes a comprehensive management structure that integrates a model for health systems with a strategic planning process, strategic planning tools and appropriate quality metrics, and shows how the Pietermaritzburg Metropolitan Trauma Service in KwaZulu-Natal Province, South Africa, successfully used this structure to facilitate and contextualise a diverse number of quality improvement programmes and research initiatives in the realm of rural acute surgery and trauma. We have found this structure to be useful, and hope that it may be applied to other acute healthcare systems.
International Space Station Increment Operations Services
NASA Astrophysics Data System (ADS)
Michaelis, Horst; Sielaff, Christian
2002-01-01
The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.
Cangialose, C B; Blair, A E; Borchardt, J S; Ades, T B; Bennett, C L; Dickersin, K; Gesme, D H; Henderson, I C; McGinnis, L S; Mooney, K; Mortenson, L E; Sperduto, P; Winkenwerder, W; Ballard, D J
2000-06-15
A multidisciplinary panel representing various stakeholders in the health care delivery and oncology services marketplace was convened to develop specific criteria for healthcare purchasers to consider when evaluating the structures and processes of health plans. These rank ordered criteria also can be used by oncologic service providers and health plan designers as a yardstick for the services they offer. A multidisciplinary 31-member Task Force was assembled by the Kerr L. White Institute and the American Cancer Society in March 1997. Task Force members were selected for their ability to offer expert insight as purchasers, suppliers, policymakers, consumers, or stakeholders in the health care marketplace. A preference-weighted majority voting rule was used to identify the three most important recommendations of the 10 that were generated through a modified Delphi technique. To test the practicality of the top three recommendations, leaders of large managed care organizations (MCOs) were surveyed; the results of this survey then were compared with the results of the Task Force survey. The three most important recommendations from the Task Force were that health plans provide access to: 1) comprehensive cancer care, 2) preventive and screening services, and 3) second opinions and treatment options supported by scientific evidence. The difference between the responses of the Task Force and the MCOs was that MCOs placed the highest importance on evidence-based decision-making, with their next three rankings coinciding with those identified by the Task Force. The value of these summary recommendations will be realized through their use by both purchasers and suppliers to influence the structure and content of the delivery of oncologic services.
A case study of assigning conservation value to dispersed habitat units for conservation planning
Rohweder, Jason J.; Sara C. Vacek,; Crimmins, Shawn M.; Thogmartin, Wayne E.
2015-01-01
Resource managers are increasingly tasked with developing habitat conservation plans in the face of numerous, sometimes competing, objectives. These plans must often be implemented across dispersed habitat conservation units that may contribute unequally to overall conservation objectives. Using U.S. Fish and Wildlife Service waterfowl production areas (WPA) in western Minnesota as our conservation landscape, we develop a landscape-scale approach for evaluating the conservation value of dispersed habitat conservation units with multiple conservation priorities. We evaluated conservation value based on a suite of variables directly applicable to conservation management practices, thus providing a direct link between conservation actions and outcomes. We developed spatial models specific to each of these conservation objectives and also developed two freely available prioritization tools to implement these analyses. We found that some WPAs provided high conservation value across a range of conservation objectives, suggesting that managing these specific areas would achieve multiple conservation goals. Conversely, other WPAs provided low conservation value for some objectives, suggesting they would be most effectively managed for a distinct set of specific conservation goals. Approaches such as ours provide a direct means of assessing the conservation value of dispersed habitat conservation units and could be useful in the development of habitat management plans, particularly when faced with multiple conservation objectives.
Aircrew-aircraft integration: A summary of US Army research programs and plans
NASA Technical Reports Server (NTRS)
Key, D. L.; Aiken, E. W.
1984-01-01
A review of selected programs which illustrate the research efforts of the U.S. Army Aeromechanics Laboratory in the area of aircrew-aircraft integration is presented. Plans for research programs to support the development of future military rotorcraft are also described. The crew of a combat helicopter must, in general, perform two major functions during the conduct of a particular mission: flightpath control and mission management. Accordingly, the research programs described are being conducted in the same two major categories: (1) flightpath control, which encompasses the areas of handling qualities, stability and control, and displays for the pilot's control of the rotorcraft's flightpath, and (2) mission management, which includes human factors and cockpit integration research topics related to performance of navigation, communication, and aircraft systems management tasks.
NASA Astrophysics Data System (ADS)
Festiyed; Djamas, D.; Pilendia, D.
2018-04-01
The purpose of this study is to enhance the problem solving and self-management abilities of student teachers through individual and group authentic task. Preliminary results showed that the learning outcomes in high category, nevertheless problem solving and self-management abilities are still low and average categories (scattered at interval 40 ≤ N ≤ 65). Initiative to improve this condition is needed. Action research is the alternative solution for that condition through planning, acting, evaluating, and reflecting. This study is allowed in 4 cycles. The acting step result with integrated discuss method, case study, and presentation including self-assessment for individual and group. This method was effective to enhance problem solving and self-management abilities. The final learning outcomes seen from the correlation between student self-assessment and lecture-assessment (r=0.19). Its means there are unidirectional relationship between the result of self-assessment and lecture-assessment. The Conclusion of the research was effective to enhance problem solving and self-management ability.
Kalhor, Rohollah; Tajnesaei, Mahsa; Kakemam, Edris; Keykaleh, Mesam Safi; Kalhor, Leila
2016-12-01
Hospital managers should have enough managerial competencies to coordinate the complex environment. The underlying assumption is that there is a potential gap in management capacity between public and private hospitals in Iran. This study aims to evaluate competency level of hospital managers and to compare their competencies in public and private hospitals. This study was descriptive-analytic, carried out in 2015. A survey using a self-administered questionnaire was conducted among 127 public and private hospitals managers in Tehran Province, Iran. Respondents were asked to rate their competencies in a five-key subscale that included people-related skills, health delivery, self-management, task-related skills, and strategic planning and management. Ratings were based on a five-point Likert scale ranging from very low to excellent competency level. Self-assessment of competencies level showed that managers in all state hospitals evaluate their competency at a low level. Managers felt most competent in health-delivery skills (3.71), people-related skills (3.61), and strategic planning and management (3.57), relatively less competent in self-management (3.54) and task-related skills (3.49). While being the mean total competency levels were significantly higher among male managers, those who participated in the healthcare/hospital management training courses, and those whose primary formal qualification was management in healthcare/hospital management (P<0.05). Similarly, managers who had more experience in their current position were more likely to report higher competencies level (P<0.05). Managers in private hospitals perceived themselves to be significantly more competent than their public hospitals colleagues in most of the management facets (P<0.001). There is a perceived lack of management capacity by managers of both public and private hospitals and the gap between public and private hospitals is small. There is widespread need for management training to be made available in Iran.
Encoding and choice in the task span paradigm.
Reiman, Kaitlin M; Weaver, Starla M; Arrington, Catherine M
2015-03-01
Cognitive control during sequences of planned behaviors requires both plan-level processes such as generating, maintaining, and monitoring the plan, as well as task-level processes such as selecting, establishing and implementing specific task sets. The task span paradigm (Logan in J Exp Psychol Gen 133:218-236, 2004) combines two common cognitive control paradigms, task switching and working memory span, to investigate the integration of plan-level and task-level processes during control of sequential behavior. The current study expands past task span research to include measures of encoding processes and choice behavior with volitional sequence generation, using the standard task span as well as a novel voluntary task span paradigm. In two experiments, we consider how sequence complexity, defined separately for plan-level and task-level complexity, influences sequence encoding (Experiment 1), sequence choice (Experiment 2), sequence memory, and task performance of planned sequences of action. Results indicate that participants were sensitive to sequence complexity, but that different aspects of behavior are most strongly influenced by different types of complexity. Hierarchical complexity at the plan level best predicts voluntary sequence generation and memory; while switch frequency at the task level best predicts encoding of externally defined sequences and task performance. Furthermore, performance RTs were similar for externally and internally defined plans, whereas memory was improved for internally defined sequences. Finally, participants demonstrated a significant sequence choice bias in the voluntary task span. Consistent with past research on choice behavior, volitional selection of plans was markedly influenced by both the ease of memory and performance.
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.
2013-01-01
In a series of papers, Nairne and colleagues have demonstrated that tasks encouraging participants to judge words for relevance to survival led to better recall than did tasks lacking survival relevance. Klein, Robertson, and Delton (2010) presented data suggesting that the future-directed temporal orientation of the survival task (e.g., planning), rather than survival per se, accounts for the good recall found with the task. In the present studies we manipulated the amount of survival and planning processing encouraged by a set of encoding tasks. Participants performed tasks that encouraged processing stimuli for their relevance to (a) both survival and planning, (b) planning, but not survival, or (c) survival but not planning. We predicted, and found, that recall performance associated with tasks encouraging planning (i.e., survival with planning and planning without survival) should exceed tasks that encouraged survival but not planning (i.e., survival without planning). We draw several conclusions. First, planning is a necessary component of the superior recall found in the survival paradigm. Second, memory, from an evolutionary perspective, is inherently prospective—tailored by natural selection to support future decisions and judgements that cannot be known in advance with certainty. PMID:21229456
Daugherty, Elizabeth L; Rubinson, Lewis
2011-11-01
In recent years, healthcare disaster planning has grown from its early place as an occasional consideration within the manuals of emergency medical services and emergency department managers to a rapidly growing field, which considers continuity of function, surge capability, and process changes across the spectrum of healthcare delivery. A detailed examination of critical care disaster planning was undertaken in 2007 by the Task Force for Mass Critical Care of the American College of Chest Physicians Critical Care Collaborative Initiative. We summarize the Task Force recommendations and available updated information to answer a fundamental question for critical care disaster planners: What is a prepared intensive care unit and how do I ensure my unit's readiness? Database searches and review of relevant published literature. Preparedness is essential for successful response, but because intensive care units face many competing priorities, without defining "preparedness for what," the task can seem overwhelming. Intensive care unit disaster planners should, therefore, along with the entire hospital, participate in a hospital or regionwide planning process to 1) identify critical care response vulnerabilities; and 2) clarify the hazards for which their community is most at risk. The process should inform a comprehensive written preparedness plan targeting the most worrisome scenarios and including specific guidance on 1) optimal use of space, equipment, and staffing for delivery of critical care to significantly increased patient volumes; 2) allocation of resources for provision of essential critical care services under conditions of absolute scarcity; 3) intensive care unit evacuation; and 4) redundant internal communication systems and means for timely data collection. Critical care disaster planners have a complex, challenging task. Experienced planners will agree that no disaster response is perfect, but careful planning will enable the prepared intensive care unit to respond effectively in times of crisis.
Addressing the gaps in preparation for quarantine.
Nathawad, Rita; Roblin, Patricia M; Pruitt, Darrin; Arquilla, Bonnie
2013-04-01
In the event of an outbreak of a communicable respiratory illness, quarantine may become necessary. The New York Institute for All Hazard Preparedness (NYIAHP) of the State University of New York (SUNY) Downstate Medical Center, in cooperation with the New York City Department of Health and Mental Hygiene's Healthcare Emergency Preparedness Program, (NYC DOHMH-HEPP) quarantine working group, has developed a series of clinical protocols to help health care facilities respond to such an event. Two full-scale exercises (FSEs) were designed and conducted a year apart in the quarantine unit at Kings County Hospital Center (KCHC) to test the efficacy and feasibility of these quarantine protocols. The goal of these exercises was to identify the gaps in preparedness for quarantine and increase hospital readiness for such an event. Evaluators monitored for efficient management of critical physical plants, personnel and material resources. Players were expected to integrate and practice emergency response plans and protocols specific to quarantine. In developing the exercise objectives, five activities were selected for evaluation: Activation of the Unit, Staffing, Charting/Admission, Symptom Monitoring and Infection Control, and Client Management. The results of the initial FSE found that there were incomplete critical tasks within all five protocols: These deficiencies were detailed in an After Action Report and an Improvement Plan was presented to the KCHC Disaster Preparedness Committee a month after the initial FSE. In the second FSE a year later, all critical tasks for Activation of the unit, Staffing and Charting/Admission were achieved. Completion of critical tasks related to Symptom Monitoring and Infection Control and Client Management was improved in the second FSE, but some tasks were still not performed appropriately. In short, these exercises identified critical needs in disaster preparedness of the KCHC Quarantine Unit. The lessons learned from this logistical exercise enabled the planning group to have a better understanding of leadership needs, communication capabilities, and infection control procedures. Kings County Hospital Center performed well during these exercises. It was clear that performance in the second exercise was improved, and many problems noted in the first exercise were corrected. Staff also felt better prepared the second time. This supports the idea that frequent exercises are vital to maintain disaster readiness.
Telerobotic management system: coordinating multiple human operators with multiple robots
NASA Astrophysics Data System (ADS)
King, Jamie W.; Pretty, Raymond; Brothers, Brendan; Gosine, Raymond G.
2003-09-01
This paper describes an application called the Tele-robotic management system (TMS) for coordinating multiple operators with multiple robots for applications such as underground mining. TMS utilizes several graphical interfaces to allow the user to define a partially ordered plan for multiple robots. This plan is then converted to a Petri net for execution and monitoring. TMS uses a distributed framework to allow robots and operators to easily integrate with the applications. This framework allows robots and operators to join the network and advertise their capabilities through services. TMS then decides whether tasks should be dispatched to a robot or a remote operator based on the services offered by the robots and operators.
Amplifying human ability through autonomics and machine learning in IMPACT
NASA Astrophysics Data System (ADS)
Dzieciuch, Iryna; Reeder, John; Gutzwiller, Robert; Gustafson, Eric; Coronado, Braulio; Martinez, Luis; Croft, Bryan; Lange, Douglas S.
2017-05-01
Amplifying human ability for controlling complex environments featuring autonomous units can be aided by learned models of human and system performance. In developing a command and control system that allows a small number of people to control a large number of autonomous teams, we employ an autonomics framework to manage the networks that represent mission plans and the networks that are composed of human controllers and their autonomous assistants. Machine learning allows us to build models of human and system performance useful for monitoring plans and managing human attention and task loads. Machine learning also aids in the development of tactics that human supervisors can successfully monitor through the command and control system.
Research priorities and plans for the International Space Station-results of the 'REMAP' Task Force
NASA Technical Reports Server (NTRS)
Kicza, M.; Erickson, K.; Trinh, E.
2003-01-01
Recent events in the International Space Station (ISS) Program have resulted in the necessity to re-examine the research priorities and research plans for future years. Due to both technical and fiscal resource constraints expected on the International Space Station, it is imperative that research priorities be carefully reviewed and clearly articulated. In consultation with OSTP and the Office of Management and budget (OMB), NASA's Office of Biological and Physical Research (OBPR) assembled an ad-hoc external advisory committee, the Biological and Physical Research Maximization and Prioritization (REMAP) Task Force. This paper describes the outcome of the Task Force and how it is being used to define a roadmap for near and long-term Biological and Physical Research objectives that supports NASA's Vision and Mission. Additionally, the paper discusses further prioritizations that were necessitated by budget and ISS resource constraints in order to maximize utilization of the International Space Station. Finally, a process has been developed to integrate the requirements for this prioritized research with other agency requirements to develop an integrated ISS assembly and utilization plan that maximizes scientific output. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.
Program on State Agency Remote Sensing Data Management (SARSDM). [missouri
NASA Technical Reports Server (NTRS)
Eastwood, L. F., Jr.; Gotway, E. O.
1978-01-01
A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri.
Action planning and position sense in children with Developmental Coordination Disorder.
Adams, Imke L J; Ferguson, Gillian D; Lust, Jessica M; Steenbergen, Bert; Smits-Engelsman, Bouwien C M
2016-04-01
The present study examined action planning and position sense in children with Developmental Coordination Disorder (DCD). Participants performed two action planning tasks, the sword task and the bar grasping task, and an active elbow matching task to examine position sense. Thirty children were included in the DCD group (aged 6-10years) and age-matched to 90 controls. The DCD group had a MABC-2 total score ⩽5th percentile, the control group a total score ⩾25th percentile. Results from the sword-task showed that children with DCD planned less for end-state comfort. On the bar grasping task no significant differences in planning for end-state comfort between the DCD and control group were found. There was also no significant difference in the position sense error between the groups. The present study shows that children with DCD plan less for end-state comfort, but that this result is task-dependent and becomes apparent when more precision is needed at the end of the task. In that respect, the sword-task appeared to be a more sensitive task to assess action planning abilities, than the bar grasping task. The action planning deficit in children with DCD cannot be explained by an impaired position sense during active movements. Copyright © 2016 Elsevier B.V. All rights reserved.
NASA Astrophysics Data System (ADS)
Curci, Vita; Dassisti, Michele; Josefa, Mula Bru; Manuel, Díaz Madroñero
2014-10-01
Supply chain model (SCM) are potentially capable to integrate different aspects in supporting decision making for enterprise management tasks. The aim of the paper is to propose an hybrid mathematical programming model for optimization of production requirements resources planning. The preliminary model was conceived bottom-up from a real industrial case analysed oriented to maximize cash flow. Despite the intense computational effort required to converge to a solution, optimisation done brought good result in solving the objective function.
Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions
NASA Technical Reports Server (NTRS)
1994-01-01
In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.
Implementing the EU Floods Directive (2007/60/EC) in Austria: Flood Risk Management Plans
NASA Astrophysics Data System (ADS)
Neuhold, Clemens
2013-04-01
he Directive 2007/60/EC of the European Parliament and of the Council of 23 October 2007 on the assessment and management of flood risks (EFD) aims at the reduction of the adverse consequences for human health, the environment, cultural heritage and economic activity associated with floods in the Community. This task is to be achieved based on three process steps (1) preliminary flood risk assessment (finalised by the end of 2011), (2) flood hazard maps and flood risk maps (due 2013) and (3) flood risk management plans (due 2015). Currently, an interdisciplinary national working group is defining the methodological framework for flood risk management plans in Austria supported by a constant exchange with international bodies and experts. Referring to the EFD the components of the flood risk management plan are (excerpt): 1. conclusions of the preliminary flood risk assessment 2. flood hazard maps and flood risk maps and the conclusions that can be drawn from those maps 3. a description of the appropriate objectives of flood risk management 4. a summary of measures and their prioritisation aiming to achieve the appropriate objectives of flood risk management The poster refers to some of the major challenges in this process, such as the legal provisions, coordination of administrative units, definition of public relations, etc. The implementation of the EFD requires the harmonisation of legal instruments of various disciplines (e.g. water management, spatial planning, civil protection) enabling a coordinated - and ideally binding - practice of flood risk management. This process is highly influenced by the administrative organisation in Austria - federal, provincial and municipality level. The Austrian approach meets this organisational framework by structuring the development of the flood risk management plan into 3 time-steps: (a) federal blueprint, (b) provincial editing and (c) federal finishing as well as reporting to the European Commission. Each time-step addresses different administrative levels and spatial scales accompanied by the active involvement of interested parties.
Mitchell, Geoffrey K; Brown, Robyn M; Erikssen, Lars; Tieman, Jennifer J
2008-01-01
Background Chronic disease management requires input from multiple health professionals, both specialist and primary care providers. This study sought to assess the impact of co-ordinated multidisciplinary care in primary care, represented by the delivery of formal care planning by primary care teams or shared across primary-secondary teams, on outcomes in stroke, relative to usual care. Methods A Systematic review of Medline, EMBASE, CINAHL (all 1990–2006), Cochrane Library (Issue 1 2006), and grey literature from web based searching of web sites listed in the CCOHA Health Technology Assessment List Analysis used narrative analysis of findings of randomised and non-randomised trials, and observational and qualitative studies of patients with completed stroke in the primary care setting where care planning was undertaken by 1) a multi-disciplinary primary care team or 2) through shared care by primary and secondary providers. Results One thousand and forty-five citations were retrieved. Eighteen papers were included for analysis. Most care planning took part in the context of multidisciplinary team care based in hospitals with outreach to community patients. Mortality rates are not impacted by multidisciplinary care planning. Functional outcomes of the studies were inconsistent. It is uncertain whether the active engagement of GPs and other primary care professionals in the multidisciplinary care planning contributed to the outcomes in the studies showing a positive effect. There may be process benefits from multidisciplinary care planning that includes primary care professionals and GPs. Few studies actually described the tasks and roles GPs fulfilled and whether this matched what was presumed to be provided. Conclusion While multidisciplinary care planning may not unequivocally improve the care of patients with completed stroke, there may be process benefits such as improved task allocation between providers. Further study on the impact of active GP involvement in multidisciplinary care planning is warranted. PMID:18681977
Sanders, Chad; Low, Christina; Schmitter-Edgecombe, Maureen
2014-01-01
There is currently limited research evaluating planning abilities, a core subcomponent of executive functioning, in individuals with mild cognitive impairment (MCI). In the present study, we utilized the "Amap Task," an open-ended problem-solving task, to separately evaluate the formulation and execution components of planning ability in individuals with MCI. Thirty-seven cognitively healthy older adults and 37 individuals with MCI used a map layout of a university apartment to develop and write out a strategy (formulation stage) to successfully complete a list of tasks (e.g., retrieve and fill a water pitcher before placing it in the refrigerator). Subsequently, participants carried out the tasks in the apartment with the aid of their formulated plan (execution stage). MCI participants performed more poorly than older adult (OA) controls during both the formulation and execution stages on measures of task accuracy and task efficiency. However, both groups were able to adjust and improve task accuracy and efficiency from formulation to task execution. Finally, MCI participants took significantly longer to complete the task and adhered less to their formulated plans during task completion. Using an open-ended problem-solving task, the findings revealed that individuals with MCI experienced difficulties with both the formulation and execution components of planning. Like controls, participants with MCI were able to successfully modify their plan online, improving their performance from task formulation to task execution.
An efficient temporal logic for robotic task planning
NASA Technical Reports Server (NTRS)
Becker, Jeffrey M.
1989-01-01
Computations required for temporal reasoning can be prohibitively expensive if fully general representations are used. Overly simple representations, such as totally ordered sequence of time points, are inadequate for use in a nonlinear task planning system. A middle ground is identified which is general enough to support a capable nonlinear task planner, but specialized enough that the system can support online task planning in real time. A Temporal Logic System (TLS) was developed during the Intelligent Task Automation (ITA) project to support robotic task planning. TLS is also used within the ITA system to support plan execution, monitoring, and exception handling.
Optimization-based decision support to assist in logistics planning for hospital evacuations.
Glick, Roger; Bish, Douglas R; Agca, Esra
2013-01-01
The evacuation of the hospital is a very complex process and evacuation planning is an important part of a hospital's emergency management plan. There are numerous factors that affect the evacuation plan including the nature of threat, availability of resources and staff the characteristics of the evacuee population, and risk to patients and staff. The safety and health of patients is of fundamental importance, but safely moving patients to alternative care facilities while under threat is a very challenging task. This article describes the logistical issues and complexities involved in planning and execution of hospital evacuations. Furthermore, this article provides examples of how optimization-based decision support tools can help evacuation planners to better plan for complex evacuations by providing real-world solutions to various evacuation scenarios.
ERIC Educational Resources Information Center
Yuan, Fangyuan; Ellis, Rod
2003-01-01
Investigated the effects of both pre-task and on-line planning on second language (L2) oral production. Results show that pre-task planning enhances grammatical complexity while on-line planning positively influences accuracy and grammatical complexity. Pre-task planners also produced more fluent and lexically varied language than the on-line…
Information Management For Tactical Reconnaissance
NASA Astrophysics Data System (ADS)
White, James P.
1984-12-01
The expected battlefield tactics of the 1980's and 1990's will be fluid and dynamic. If tactical reconnaissance is to meet this challenge, it must explore all ways of accelerating the flow of information through the reconnaissance cycle, from the moment a tasking request is received to the time the mission results are delivered to the requestor. In addition to near real-time dissemination of reconnaissance information, the mission planning phase needs to be more responsive to the rapidly changing battlefield scenario. By introducing Artificial Intelligence (AI) via an expert system to the mission planning phase, repetitive and computational tasks can be more readily performed by the ground-based mission planning system, thereby permitting the aircrew to devote more of their time to target study. Transporting the flight plan, plus other mission data, to the aircraft is simple with the Fairchild Data Transfer Equipment (DTE). Aircrews are relieved of the tedious, error-prone, and time-consuming task of manually keying-in avionics initialization data. Post-flight retrieval of mission data via the DTE will permit follow-on aircrews, just starting their mission planning phase, to capitalize on current threat data collected by the returning aircrew. Maintenance data retrieved from the recently flown mission will speed-up the aircraft turn-around by providing near-real time fault detection/isolation. As future avionics systems demand more information, a need for a computer-controlled, smart data base or expert system on-board the aircraft will emerge.
Teaching Case: Analysis of an Electronic Voting System
ERIC Educational Resources Information Center
Thompson, Nik; Toohey, Danny
2014-01-01
This teaching case discusses the analysis of an electronic voting system. The development of the case was motivated by research into information security and management, but as it includes procedural aspects, organizational structure and personnel, it is a suitable basis for all aspects of systems analysis, planning and design tasks. The material…
Courage in the Classroom: Exploring a New Framework Predicting Academic Performance and Engagement
ERIC Educational Resources Information Center
Martin, Andrew J.
2011-01-01
In the context of 7,637 high school students, the present study explored an hypothesized formulation of academic courage (defined as perseverance in the face of academic difficulty and fear) and its role in predicting academic performance (literacy and arithmetic) and various academic engagement measures (planning, task management,…
Revisiting Communication during a Crisis: Insights from Kenneth Trump
ERIC Educational Resources Information Center
Kowalski, Theodore J.
2005-01-01
In the aftermath of several tragic incidents of school violence, school administrators began focusing more directly on crisis management. Those who actually had to activate their plans often discovered that communication--with the media and with the general community--was one of the most challenging tasks they faced. In an effort to determine if…
78 FR 39300 - Notice of Advisory Council on Historic Preservation Quarterly Business Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-01
... V. Chairman's Report VI. ACHP Management Issues A. ACHP FY 2013 and 2014 Budget B. Alumni Foundation Report C. ACHP Office Relocation Update VII. Historic Preservation Policy and Programs A. Building a More.... Planning for 50th Anniversary of the National Historic Preservation Act D. Rightsizing Task Force Report E...
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.
ERIC Educational Resources Information Center
Linford, Maxine D.; And Others
The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…
Coherence between harvest and habitat management -- Joint venture perspectives
Baxter, C.K.; Nelson, J.W.; Reinecke, K.J.; Stephens, S.E.
2006-01-01
Introduction: In recent months, an ad hoc group of waterfowl scientists, representing the International Association of Fish and Wildlife Agencies (IAFWA) Adaptive Harvest Management (ARM) Task Force and the North American Waterfowl Management Plan (NAWMP) Committee, have collaborated as a Joint Task Group (JTG) to assess options for unifying the population goals guiding waterfowl harvest management and habitat management. The JTG has been charged with bringing coherence to the population goals of the two programs. Characterizing the problem as one of coherence indicates value judgments exist regarding its significance or perhaps existence. For purposes of this paper, we characterize the lack of coherence as the absence of consistent population goals in the two related components of waterfowl conservation habitat and harvest management. Our purpose is to support continued dialogue on the respective goals of these programs and the possible implications of discordant goals to habitat joint ventures. Our objectives are two-fold: (1) illustrate how NAWMP habitat management goals and strategies have been interpreted and pursued in both breeding and wintering areas, and (2) provide perspectives on the linkages between regional habitat management programs and harvest management. The Lower Mississippi Valley and the Prairie Pothole joint ventures (LMVJV and PPJV, respectively) will be used as examples.
Science Goals of the U.S. Department of the Interior Southeast Climate Science Center
Dalton, Melinda S.
2011-01-01
In 2011, the U.S. Department of the Interior Southeast Climate Science Center (CSC) finalized the first draft of its goals for research needed to address the needs of natural and cultural partners for climate science in the Southeastern United States. The science themes described in this draft plan were established to address the information needs of ecoregion conservation partnerships, such as the Landscape Conservation Cooperatives (LCCs) and other regional conservation-science and resource-management partners. These themes were developed using priorities defined by partners and stakeholders in the Southeast and on a large-scale, multidisciplinary project-the Southeast Regional Assessment Project (SERAP)-developed in concert with those partners. Science products developed under these themes will provide models of potential future conditions, assessments of likely impacts, and tools that can be used to inform the conservation management decisions of LCCs and other partners. This information will be critical as managers try to anticipate and adapt to climate change. Resource managers in the Southeast are requesting this type of information, in many cases as a result of observed climate change effects. The Southeast CSC draft science plan identifies six science themes and frames the activities (tasks, with examples of recommended near-term work for each task included herein) related to each theme that are needed to achieve the objectives of the Southeast CSC.
Air System Information Management
NASA Technical Reports Server (NTRS)
Filman, Robert E.
2004-01-01
I flew to Washington last week, a trip rich in distributed information management. Buying tickets, at the gate, in flight, landing and at the baggage claim, myriad messages about my reservation, the weather, our flight plans, gates, bags and so forth flew among a variety of travel agency, airline and Federal Aviation Administration (FAA) computers and personnel. By and large, each kind of information ran on a particular application, often specialized to own data formats and communications network. I went to Washington to attend an FAA meeting on System-Wide Information Management (SWIM) for the National Airspace System (NAS) (http://www.nasarchitecture.faa.gov/Tutorials/NAS101.cfm). NAS (and its information infrastructure, SWIM) is an attempt to bring greater regularity, efficiency and uniformity to the collection of stovepipe applications now used to manage air traffic. Current systems hold information about flight plans, flight trajectories, weather, air turbulence, current and forecast weather, radar summaries, hazardous condition warnings, airport and airspace capacity constraints, temporary flight restrictions, and so forth. Information moving among these stovepipe systems is usually mediated by people (for example, air traffic controllers) or single-purpose applications. People, whose intelligence is critical for difficult tasks and unusual circumstances, are not as efficient as computers for tasks that can be automated. Better information sharing can lead to higher system capacity, more efficient utilization and safer operations. Better information sharing through greater automation is possible though not necessarily easy.
Li, Qing-na; Huang, Xiu-ling; Gao, Rui; Lu, Fang
2012-08-01
Data management has significant impact on the quality control of clinical studies. Every clinical study should have a data management plan to provide overall work instructions and ensure that all of these tasks are completed according to the Good Clinical Data Management Practice (GCDMP). Meanwhile, the data management plan (DMP) is an auditable document requested by regulatory inspectors and must be written in a manner that is realistic and of high quality. The significance of DMP, the minimum standards and the best practices provided by GCDMP, the main contents of DMP based on electronic data capture (EDC) and some key factors of DMP influencing the quality of clinical study were elaborated in this paper. Specifically, DMP generally consists of 15 parts, namely, the approval page, the protocol summary, role and training, timelines, database design, creation, maintenance and security, data entry, data validation, quality control and quality assurance, the management of external data, serious adverse event data reconciliation, coding, database lock, data management reports, the communication plan and the abbreviated terms. Among them, the following three parts are regarded as the key factors: designing a standardized database of the clinical study, entering data in time and cleansing data efficiently. In the last part of this article, the authors also analyzed the problems in clinical research of traditional Chinese medicine using the EDC system and put forward some suggestions for improvement.
What physicians reason about during admission case review.
Juma, Salina; Goldszmidt, Mark
2017-08-01
Research suggests that physicians perform multiple reasoning tasks beyond diagnosis during patient review. However, these remain largely theoretical. The purpose of this study was to explore reasoning tasks in clinical practice during patient admission review. The authors used a constant comparative approach-an iterative and inductive process of coding and recoding-to analyze transcripts from 38 audio-recorded case reviews between junior trainees and their senior residents or attendings. Using a previous list of reasoning tasks, analysis focused on what tasks were performed, when they occurred, and how they related to the other tasks. All 24 tasks were observed in at least one review with a mean of 17.9 (Min = 15, Max = 22) distinct tasks per review. Two new tasks-assess illness severity and patient decision-making capacity-were identified, thus 26 tasks were examined. Three overarching tasks were identified-assess priorities, determine and refine the most likely diagnosis and establish and refine management plans-that occurred throughout all stages of the case review starting from patient identification and continuing through to assessment and plan. A fourth possible overarching task-reflection-was also identified but only observed in four instances across three cases. The other 22 tasks appeared to be context dependent serving to support, expand, and refine one or more overarching tasks. Tasks were non-sequential and the same supporting task could serve more than one overarching task. The authors conclude that these findings provide insight into the 'what' and 'when' of physician reasoning during case review that can be used to support professional development, clinical training and patient care. In particular, they draw attention to the iterative way in which each task is addressed during a case review and how this finding may challenge conventional ways of teaching and assessing clinical communication and reasoning. They also suggest that further research is needed to explore how physicians decide why a supporting task is required in a particular context.
Marshall Space Flight Center Ground Systems Development and Integration
NASA Technical Reports Server (NTRS)
Wade, Gina
2016-01-01
Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.
Tagliabue, Michele; Pedrocchi, Alessandra; Pozzo, Thierry; Ferrigno, Giancarlo
2008-01-01
In spite of the complexity of human motor behavior, difficulties in mathematical modeling have restricted to rather simple movements attempts to identify the motor planning criterion used by the central nervous system. This paper presents a novel-simulation technique able to predict the "desired trajectory" corresponding to a wide range of kinematic and kinetic optimality criteria for tasks involving many degrees of freedom and the coordination between goal achievement and balance maintenance. Employment of proper time discretization, inverse dynamic methods and constrained optimization technique are combined. The application of this simulator to a planar whole body pointing movement shows its effectiveness in managing system nonlinearities and instability as well as in ensuring the anatomo-physiological feasibility of predicted motor plans. In addition, the simulator's capability to simultaneously optimize competing movement aspects represents an interesting opportunity for the motor control community, in which the coexistence of several controlled variables has been hypothesized.
Automated personnel data base system specifications, Task V. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartley, H.J.; Bocast, A.K.; Deppner, F.O.
1978-09-01
This document is the General Research Corporation report on Task V of a study for the Office of Inspection and Enforcement of the Nuclear Regulatory Commission (NRC/IE). The full title of this study is ''Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.'' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirementsmore » Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.« less
Brazilian adaptation of the Hotel Task: A tool for the ecological assessment of executive functions.
Cardoso, Caroline de Oliveira; Zimmermann, Nicolle; Paraná, Camila Borges; Gindri, Gigiane; de Pereira, Ana Paula Almeida; Fonseca, Rochele Paz
2015-01-01
Over recent years, neuropsychological research has been increasingly concerned with the need to develop more ecologically valid instruments for the assessment of executive functions. The Hotel Task is one of the most widely used ecological measures of executive functioning, and provides an assessment of planning, organization, self-monitoring and cognitive flexibility. The goal of this study was to adapt the Hotel Task for use in the Brazilian population. The sample comprised 27 participants (three translators, six expert judges, seven healthy adults, ten patients with traumatic brain injuries and one hotel manager). The adaptation process consisted of five steps, which were repeated until a satisfactory version of the task was produced. The steps were as follows:(1) Translation;(2) Development of new stimuli and brainstorming among the authors;(3) Analysis by expert judges;(4) Pilot studies;(5) Assessment by an expert in business administration and hotel management. The adapted version proved adequate and valid for the assessment of executive functions. However, further research must be conducted to obtain evidence of the reliability, as well as the construct and criterion validity, sensitivity and specificity, of the Hotel Task. Many neurological and/or psychiatric populations may benefit from the adapted task, since it may make significant contributions to the assessment of dysexecutive syndromes and their impact on patient functioning.
Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J
2007-01-01
To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishment of an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of on-site responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.
Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J
2007-01-01
To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishing an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination, and integration of on-site responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.
Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J
2007-04-01
To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishing an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of onsite responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated.
Drezner, Jonathan A; Courson, Ron W; Roberts, William O; Mosesso, Vincent N; Link, Mark S; Maron, Barry J
2007-01-01
Objective: To assist high school and college athletic programs prepare for and respond to a sudden cardiac arrest (SCA). This consensus statement summarizes our current understanding of SCA in young athletes, defines the necessary elements for emergency preparedness, and establishes uniform treatment protocols for the management of SCA. Background: Sudden cardiac arrest is the leading cause of death in young athletes. The increasing presence of and timely access to automated external defibrillators (AEDs) at sporting events provides a means of early defibrillation and the potential for effective secondary prevention of sudden cardiac death. An Inter-Association Task Force was sponsored by the National Athletic Trainers' Association to develop consensus recommendations on emergency preparedness and management of SCA in athletes. Recommendations: Comprehensive emergency planning is needed for high school and college athletic programs to ensure an efficient and structured response to SCA. Essential elements of an emergency action plan include establishment of an effective communication system, training of anticipated responders in cardiopulmonary resuscitation and AED use, access to an AED for early defibrillation, acquisition of necessary emergency equipment, coordination and integration of on-site responder and AED programs with the local emergency medical services system, and practice and review of the response plan. Prompt recognition of SCA, early activation of the emergency medical services system, the presence of a trained rescuer to initiate cardiopulmonary resuscitation, and access to early defibrillation are critical in the management of SCA. In any collapsed and unresponsive athlete, SCA should be suspected and an AED applied as soon as possible for rhythm analysis and defibrillation if indicated. PMID:17597956
Phoenix, Michelle; Rosenbaum, Peter; Watson, Denise; Camden, Chantal
2016-01-01
Pediatric rehabilitation centers constantly reorganize services to accommodate changes in funding, client needs, evidence-based practices, accountability requirements, theoretical models, and values. However, there are few service delivery models or descriptions of how organizations plan for change to guide organizations through this complex task. This case report presents the "5Rs of Reorganization," a novel process for planning service delivery reorganization projects in pediatric rehabilitation centers. The 5Rs include: 1. Recognize the need for change, 2. Reallocate resources for project management, 3. Review the reality of clients, service delivery, and the community, 4. Reconstruct reality, and 5. Report results. The implementation and outcomes of the "5Rs of Reorganization" process are described for one pediatric rehabilitation center to illustrate how use of this process led to effective service delivery reorganization planning. The resulting multi-component customized service delivery plan reflects high levels of stakeholder involvement. Principles of project management can be applied to support service delivery reorganization planning within pediatric rehabilitation centers using the "5Rs of Reorganization." Strong communication throughout the planning phase is key to developing and sharing a plan for service delivery reorganization. Communication can be supported through use of the 5R process.
Oncentra brachytherapy planning system.
Yang, Jack
2018-03-27
In modern cancer management, treatment planning has progressed as a contemporary tool with all the advances in computing power in recent years. One of the advanced planning tools uses 3-dimensional (3D) data sets for accurate dose distributions in patient prescription. Among these planning processes, brachytherapy has been a very important part of a successful cancer management program, offering clinical benefits with specific or combined treatments with external beam therapy. In this chapter, we mainly discussed the Elekta Oncentra planning system, which is the main treatment planning tool for high-dose rate (HDR) modality in our facility and in many other facilities in the United States. HDR is a technically advanced form of brachytherapy; a high-intensity radiation source (3.6 mm in length) is delivered with step motor in submillimeter precision under computer guidance directly into the tumor areas while minimizing injury to surrounding normal healthy tissue. Oncentra planning is the key component to generate a deliverable brachytherapy procedure, which is executed on the microSelectron V3 remote afterloader treatment system. Creating a highly conformal plan can be a time-consuming task. The development of Oncentra software (version 4.5.3) offers a variety of useful tools that facilitate many of the clinical challenging tasks for planning, such as contouring and image reconstruction, as well as rapid planning calculations with dose and dose volume histogram analysis. Oncentra Brachy module creates workflow and optimizes the planning accuracy for wide varieties of clinical HDR treatments, such as skin, gynecologic (GYN), breast, prostate, and many other applications. The treatment file can also be transferred to the afterloader control station for speedy delivery. The design concept, calculation algorithms, and optimization modules presented some key characteristics to plan and treat the patients effectively and accurately. The dose distribution and accuracy of several clinical sample cases were discussed to illustrate the effectiveness and clinical efficacy. The American Association of Physicists in Medicine brachytherapy reports of TG-43 and TG-186 were also described and compared in evaluations of fundamental calculation methodologies. Copyright © 2018 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
Applying the metro map to software development management
NASA Astrophysics Data System (ADS)
Aguirregoitia, Amaia; Dolado, J. Javier; Presedo, Concepción
2010-01-01
This paper presents MetroMap, a new graphical representation model for controlling and managing the software development process. Metromap uses metaphors and visual representation techniques to explore several key indicators in order to support problem detection and resolution. The resulting visualization addresses diverse management tasks, such as tracking of deviations from the plan, analysis of patterns of failure detection and correction, overall assessment of change management policies, and estimation of product quality. The proposed visualization uses a metaphor with a metro map along with various interactive techniques to represent information concerning the software development process and to deal efficiently with multivariate visual queries. Finally, the paper shows the implementation of the tool in JavaFX with data of a real project and the results of testing the tool with the aforementioned data and users attempting several information retrieval tasks. The conclusion shows the results of analyzing user response time and efficiency using the MetroMap visualization system. The utility of the tool was positively evaluated.
A farm-level precision land management framework based on integer programming
Li, Qi; Hu, Guiping; Jubery, Talukder Zaki; Ganapathysubramanian, Baskar
2017-01-01
Farmland management involves several planning and decision making tasks including seed selection and irrigation management. A farm-level precision farmland management model based on mixed integer linear programming is proposed in this study. Optimal decisions are designed for pre-season planning of crops and irrigation water allocation. The model captures the effect of size and shape of decision scale as well as special irrigation patterns. The authors illustrate the model with a case study on a farm in the state of California in the U.S. and show the model can capture the impact of precision farm management on profitability. The results show that threefold increase of annual net profit for farmers could be achieved by carefully choosing irrigation and seed selection. Although farmers could increase profits by applying precision management to seed or irrigation alone, profit increase is more significant if farmers apply precision management on seed and irrigation simultaneously. The proposed model can also serve as a risk analysis tool for farmers facing seasonal irrigation water limits as well as a quantitative tool to explore the impact of precision agriculture. PMID:28346499
SU-F-P-03: Management of Time to Treatment Inititation: Case for An Electronic Whiteboard
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adnani, N
2016-06-15
Purpose: To determine if data mining of an electronic whiteboard improves the management of the Time to Treatment Initiation (TTI) in radiation oncology. Methods: An electronic whiteboard designed to help in managing the planning workflow and improves communication regarding patient planning progress was used to record the dates at which each phase of the planning process began or completed. These are CT Sim date, Plan Start, Physician Review, Physicist Review, Approval for Treatment Delivery, Setup or Verification of Simulation. Results: During clinical implementation, the electronic whiteboard was able to fulfill its primary objective of providing a transparent account of themore » planning progress of each patient. Peer pressure also meant that individual tasks, such as contouring, were easily brought to the attention of the responsible party and prioritized accordingly. Data mining to analyze the electronic whiteboard per patient (figure 1), per diagnosis (figure 2), per treatment modality (figure 3), per physician (figure 4), per planner (figure 5), etc., added another sophisticated tool in the management of Time to Treatment Initiation without compromising quality of the plans being generated. A longer than necessary time between CT Sim and Plan Start can be discussed among the members of the treatment team as an indication of inadequate/outdated CT Simulator, Contouring Tools, Image Fusion Tools, Other Imaging Studies (MRI, PET/CT) performed, etc. The same for the Plan Start to Physician Review where an extended time than expected may be due unrealistic planning goals, limited planning system features, etc. Conclusion: An Electronic Whiteboard in radiation oncology is not only helping with organizing planning workflow, it is also a potent tool that can be used to reduce the Time to Treatment Initiation by providing the clinic with hard data about the duration of each phase treatment planning as a function of different variable affecting the planning process. The work is supported by the Global Medical Physics Institute.« less
The Lunar Mapping and Modeling Project
NASA Technical Reports Server (NTRS)
Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.
2009-01-01
The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.
Task planning and control synthesis for robotic manipulation in space applications
NASA Technical Reports Server (NTRS)
Sanderson, A. C.; Peshkin, M. A.; Homem-De-mello, L. S.
1987-01-01
Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.
The Task Is Not Enough: Processing Approaches to Task-Based Performance
ERIC Educational Resources Information Center
Skehan, Peter; Xiaoyue, Bei; Qian, Li; Wang, Zhan
2012-01-01
This article reports on three research studies, all of which concern second language task performance. The first focuses on planning, and compares on-line and strategic planning as well as task repetition. The second study examines the role of familiarity on task performance, and compares this with conventional strategic planning. The third study…
DE-EE0006714 Final Report-Project Icebreaker™
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wagner, Lorry; Karpinski, David; Nagusky, Beth
Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less
A New Methodology for Modeling National Command Level Decisionmaking in War Games and Simulations.
1986-07-01
Conclusions about Utility and Development Options, The Rand Corporation, R-2945-DNA, March 1983. Drucker , Peter F., Management : Tasks, Responsibilities...looks to the worst case can readily find himself paralyzed. Of course, it is also true ’The effort to affect an opponent’s image of oneself is part of...how to manage forces on a continuing basis. So long as the broad features of the NCL-specified plan continue to appear valid, it is the military com
Quarterly report for the NGA FFCA project, April 1, 1994--June 30, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-31
Summaries of activities and agendas of meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project are presented. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities included collection and review of state work plans, coordination with the National Association of Attorneys General to identify areas of overlap in working on DOE issues related to environmental management, and the writing of task force meeting summaries for distribution.
Effects of planning strategies on writing dynamics and final texts.
Limpo, Teresa; Alves, Rui A
2018-06-12
Expert writing involves the interaction among three cognitively demanding processes: planning, translating, and revising. To manage the cognitive load brought on by these processes, writers frequently use strategies. Here, we examined the effects of planning strategies on writing dynamics and final texts. Before writing an argumentative text with the triple-task technique, 63 undergraduates were asked either to elaborate an outline with the argumentative structure embedded (structure-based planning condition), to provide a written list of ideas for the text (list-based planning condition), or to do a non-writing-related filler task (no planning condition). Planning showed no effects on the length of the pre-writing pause and cognitive effort, but influenced writing processes occurrences. Compared to participants in the no-planning condition, those in the planning conditions showed a later activation of revising. Moreover, participants in the structure-based condition were mainly focused on translating in the beginning and middle of composition, whereas their peers tended to distribute their attention among all processes. Planning ahead of writing also resulted in texts with longer words, produced at a higher rate. Only the structure-based planning strategy led to an increase in the number of argumentation elements as well as in essays' persuasiveness and overall quality. There was, however, no indication that these improvements in final texts were associated with changes in the dynamics of writing. Overall, the use of structure-based plans seems to be an effective and efficient way of improving undergraduates' argumentative writing. Copyright © 2018 Elsevier B.V. All rights reserved.
ERIC Educational Resources Information Center
Ricci, Frederick A.
2011-01-01
The vision of academic and business leaders often sets a pattern for all activities to follow. Organizational objectives, tasks, performance, and uses of resources are needed to obtain and reach current and future society trends influencing organizational goals. This paper identifies 5 steps leaders need to create a systems approach toward…
General of the Army George C. Marshall’s Strategic Leadership
2017-03-15
coordinate organizational activities… structure tasks, engage in planning, build vision, acquire resources to achieve goals, manage crises, personal...organization while initiating massive changes in organizational structure and ideology in spite of conflicting traditions and preferences. His enabling...immediately upon taking the position, Marshall realized that an antiquated organizational structure interfered with daily operations. He told his
Plans and status of the NASA-Lewis Research Center wind energy project
NASA Technical Reports Server (NTRS)
Thomas, R.; Puthoff, R.; Savino, J.; Johnson, W.
1975-01-01
This report describes that portion of the national five-year wind energy program that is being managed by the NASA-Lewis Research Center for the ERDA. The Lewis Research Center's Wind Power Office, its organization and plans and status are briefly described. The three major elements of the wind energy project at Lewis are the experimental 100 kW wind-turbine generator; the first generation industry-built and user-operated wind turbine generators; and the supporting research and technology tasks which are each briefly described.
Yield Model Development (YMD) implementation plan for fiscal years 1981 and 1982
NASA Technical Reports Server (NTRS)
Ambroziak, R. A. (Principal Investigator)
1981-01-01
A plan is described for supporting USDA crop production forecasting and estimation by (1) testing, evaluating, and selecting crop yield models for application testing; (2) identifying areas of feasible research for improvement of models; and (3) conducting research to modify existing models and to develop new crop yield assessment methods. Tasks to be performed for each of these efforts are described as well as for project management and support. The responsibilities of USDA, USDC, USDI, and NASA are delineated as well as problem areas to be addressed.
A dynamic case-based planning system for space station application
NASA Technical Reports Server (NTRS)
Oppacher, F.; Deugo, D.
1988-01-01
We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).
An integrated decision support system for TRAC: A proposal
NASA Technical Reports Server (NTRS)
Mukkamala, Ravi
1991-01-01
Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
Final consolidated action plan to Tiger Team. Volume 1, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
Final consolidated action plan to Tiger Team. Volume 2, Change 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-04-01
Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less
Consider long-term care as service alternative.
Loria, L S
1987-04-01
The increasing demand for elderly care services, pressures on inpatient average length of stay and payment levels, and potential financial rewards from providing additional services, makes long-term care look attractive to hospitals. Long-term care, however, is not for every hospital. Before deciding to establish long-term care services, management should examine how the service fits within the hospital's strategic plan. The action plan below provides guidance in evaluating a decision to use hospital facilities for long-term care. Examine how long-term care services fit within the hospital's strategic plan. Study area demographics and competitors to assess the need and supply of long-term care services. Survey the medical staff, consumers and payers to determine attitudes, perceptions and interests regarding long-term care services. Develop a facility plan that identifies areas of excess capacity that can be most easily converted into long-term care with minimal effects on hospital operations. Prepare a financial feasibility analysis of the contribution margin and return on investment attributable to long-term care services. Include an impact analysis on hospital operations. Establish a management task force to develop a detailed implementation plan including assigned individual responsibilities and related timetable. Develop an effective marketing plan designed to generate increased patient market share.
Huq, M. Saiful; Fraass, Benedick A.; Dunscombe, Peter B.; Gibbons, John P.; Mundt, Arno J.; Mutic, Sasa; Palta, Jatinder R.; Rath, Frank; Thomadsen, Bruce R.; Williamson, Jeffrey F.; Yorke, Ellen D.
2016-01-01
The increasing complexity of modern radiation therapy planning and delivery challenges traditional prescriptive quality management (QM) methods, such as many of those included in guidelines published by organizations such as the AAPM, ASTRO, ACR, ESTRO, and IAEA. These prescriptive guidelines have traditionally focused on monitoring all aspects of the functional performance of radiotherapy (RT) equipment by comparing parameters against tolerances set at strict but achievable values. Many errors that occur in radiation oncology are not due to failures in devices and software; rather they are failures in workflow and process. A systematic understanding of the likelihood and clinical impact of possible failures throughout a course of radiotherapy is needed to direct limit QM resources efficiently to produce maximum safety and quality of patient care. Task Group 100 of the AAPM has taken a broad view of these issues and has developed a framework for designing QM activities, based on estimates of the probability of identified failures and their clinical outcome through the RT planning and delivery process. The Task Group has chosen a specific radiotherapy process required for “intensity modulated radiation therapy (IMRT)” as a case study. The goal of this work is to apply modern risk-based analysis techniques to this complex RT process in order to demonstrate to the RT community that such techniques may help identify more effective and efficient ways to enhance the safety and quality of our treatment processes. The task group generated by consensus an example quality management program strategy for the IMRT process performed at the institution of one of the authors. This report describes the methodology and nomenclature developed, presents the process maps, FMEAs, fault trees, and QM programs developed, and makes suggestions on how this information could be used in the clinic. The development and implementation of risk-assessment techniques will make radiation therapy safer and more efficient. PMID:27370140
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huq, M. Saiful, E-mail: HUQS@UPMC.EDU
The increasing complexity of modern radiation therapy planning and delivery challenges traditional prescriptive quality management (QM) methods, such as many of those included in guidelines published by organizations such as the AAPM, ASTRO, ACR, ESTRO, and IAEA. These prescriptive guidelines have traditionally focused on monitoring all aspects of the functional performance of radiotherapy (RT) equipment by comparing parameters against tolerances set at strict but achievable values. Many errors that occur in radiation oncology are not due to failures in devices and software; rather they are failures in workflow and process. A systematic understanding of the likelihood and clinical impact ofmore » possible failures throughout a course of radiotherapy is needed to direct limit QM resources efficiently to produce maximum safety and quality of patient care. Task Group 100 of the AAPM has taken a broad view of these issues and has developed a framework for designing QM activities, based on estimates of the probability of identified failures and their clinical outcome through the RT planning and delivery process. The Task Group has chosen a specific radiotherapy process required for “intensity modulated radiation therapy (IMRT)” as a case study. The goal of this work is to apply modern risk-based analysis techniques to this complex RT process in order to demonstrate to the RT community that such techniques may help identify more effective and efficient ways to enhance the safety and quality of our treatment processes. The task group generated by consensus an example quality management program strategy for the IMRT process performed at the institution of one of the authors. This report describes the methodology and nomenclature developed, presents the process maps, FMEAs, fault trees, and QM programs developed, and makes suggestions on how this information could be used in the clinic. The development and implementation of risk-assessment techniques will make radiation therapy safer and more efficient.« less
Huq, M Saiful; Fraass, Benedick A; Dunscombe, Peter B; Gibbons, John P; Ibbott, Geoffrey S; Mundt, Arno J; Mutic, Sasa; Palta, Jatinder R; Rath, Frank; Thomadsen, Bruce R; Williamson, Jeffrey F; Yorke, Ellen D
2016-07-01
The increasing complexity of modern radiation therapy planning and delivery challenges traditional prescriptive quality management (QM) methods, such as many of those included in guidelines published by organizations such as the AAPM, ASTRO, ACR, ESTRO, and IAEA. These prescriptive guidelines have traditionally focused on monitoring all aspects of the functional performance of radiotherapy (RT) equipment by comparing parameters against tolerances set at strict but achievable values. Many errors that occur in radiation oncology are not due to failures in devices and software; rather they are failures in workflow and process. A systematic understanding of the likelihood and clinical impact of possible failures throughout a course of radiotherapy is needed to direct limit QM resources efficiently to produce maximum safety and quality of patient care. Task Group 100 of the AAPM has taken a broad view of these issues and has developed a framework for designing QM activities, based on estimates of the probability of identified failures and their clinical outcome through the RT planning and delivery process. The Task Group has chosen a specific radiotherapy process required for "intensity modulated radiation therapy (IMRT)" as a case study. The goal of this work is to apply modern risk-based analysis techniques to this complex RT process in order to demonstrate to the RT community that such techniques may help identify more effective and efficient ways to enhance the safety and quality of our treatment processes. The task group generated by consensus an example quality management program strategy for the IMRT process performed at the institution of one of the authors. This report describes the methodology and nomenclature developed, presents the process maps, FMEAs, fault trees, and QM programs developed, and makes suggestions on how this information could be used in the clinic. The development and implementation of risk-assessment techniques will make radiation therapy safer and more efficient.
Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.
West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra
2017-01-01
The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.
Valls-Serrano, C; Verdejo-García, A; Caracuel, A
2016-05-01
Polysubstance use is associated with alterations in different components of executive functioning such as working memory and response inhibition. Nevertheless, less attention has been given to executive planning skills, which are required to benefit of low structured interventions. This study examines the association between severity of use of cocaine, heroin, alcohol, fluid and crystallized intelligence and planning tasks varying on degree of structure. Data were collected from 60 polysubstance users and 30 healthy controls. Cognitive assessment consisted of three planning tasks with different structure levels: Stockings of Cambridge, Zoo Map test, and Multiple Errands Test. Polysubstance users had significant planning deficits across the three tasks compared to healthy controls. Hierarchical regression models showed that severity of drug use and fluid and crystallized intelligence significantly explained performance in all the planning tasks. However, these associations were higher for low-structured real world tasks. These low-structured tasks also showed a unique association with crystallized but not fluid intelligence. Drug abuse is negatively associated with planning abilities, and intelligence is positively associated with planning performance in real-world tasks. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Zhang, Rubo; Yang, Yu
2017-01-01
Research on distributed task planning model for multi-autonomous underwater vehicle (MAUV). A scroll time domain quantum artificial bee colony (STDQABC) optimization algorithm is proposed to solve the multi-AUV optimal task planning scheme. In the uncertain marine environment, the rolling time domain control technique is used to realize a numerical optimization in a narrowed time range. Rolling time domain control is one of the better task planning techniques, which can greatly reduce the computational workload and realize the tradeoff between AUV dynamics, environment and cost. Finally, a simulation experiment was performed to evaluate the distributed task planning performance of the scroll time domain quantum bee colony optimization algorithm. The simulation results demonstrate that the STDQABC algorithm converges faster than the QABC and ABC algorithms in terms of both iterations and running time. The STDQABC algorithm can effectively improve MAUV distributed tasking planning performance, complete the task goal and get the approximate optimal solution. PMID:29186166
Li, Jianjun; Zhang, Rubo; Yang, Yu
2017-01-01
Research on distributed task planning model for multi-autonomous underwater vehicle (MAUV). A scroll time domain quantum artificial bee colony (STDQABC) optimization algorithm is proposed to solve the multi-AUV optimal task planning scheme. In the uncertain marine environment, the rolling time domain control technique is used to realize a numerical optimization in a narrowed time range. Rolling time domain control is one of the better task planning techniques, which can greatly reduce the computational workload and realize the tradeoff between AUV dynamics, environment and cost. Finally, a simulation experiment was performed to evaluate the distributed task planning performance of the scroll time domain quantum bee colony optimization algorithm. The simulation results demonstrate that the STDQABC algorithm converges faster than the QABC and ABC algorithms in terms of both iterations and running time. The STDQABC algorithm can effectively improve MAUV distributed tasking planning performance, complete the task goal and get the approximate optimal solution.
Analysis of post-mining excavations as places for municipal waste
NASA Astrophysics Data System (ADS)
Górniak-Zimroz, Justyna
2018-01-01
Waste management planning is an interdisciplinary task covering a wide range of issues including costs, legal requirements, spatial planning, environmental protection, geography, demographics, and techniques used in collecting, transporting, processing and disposing of waste. Designing and analyzing this issue is difficult and requires the use of advanced analysis methods and tools available in GIS geographic information systems containing readily available graphical and descriptive databases, data analysis tools providing expert decision support while selecting the best-designed alternative, and simulation models that allow the user to simulate many variants of waste management together with graphical visualization of the results of performed analyzes. As part of the research study, there have been works undertaken concerning the use of multi-criteria data analysis in waste management in areas located in southwestern Poland. These works have proposed the inclusion in waste management of post-mining excavations as places for the final or temporary collection of waste assessed in terms of their suitability with the tools available in GIS systems.
Advanced Materials for Exploration Task Research Results
NASA Technical Reports Server (NTRS)
Cook, M. B. (Compiler); Murphy, K. L.; Schneider, T.
2008-01-01
The Advanced Materials for Exploration (AME) Activity in Marshall Space Flight Center s (MSFC s) Exploration Science and Technology Directorate coordinated activities from 2001 to 2006 to support in-space propulsion technologies for future missions. Working together, materials scientists and mission planners identified materials shortfalls that are limiting the performance of long-term missions. The goal of the AME project was to deliver improved materials in targeted areas to meet technology development milestones of NASA s exploration-dedicated activities. Materials research tasks were targeted in five areas: (1) Thermal management materials, (2) propulsion materials, (3) materials characterization, (4) vehicle health monitoring materials, and (5) structural materials. Selected tasks were scheduled for completion such that these new materials could be incorporated into customer development plans.
Ballhausen, Nicola; Mahy, Caitlin E V; Hering, Alexandra; Voigt, Babett; Schnitzspahn, Katharina M; Lagner, Prune; Ihle, Andreas; Kliegel, Matthias
2017-01-01
A minimal amount of research has examined the cognitive predictors of children's performance in naturalistic, errand-type planning tasks such as the Zoo Map task of the Behavioral Assessment of the Dysexecutive Syndrome for Children (BADS-C). Thus, the current study examined prospection (i.e., the ability to remember to carry out a future intention), executive functioning, and intelligence markers as predictors of performance in this widely used naturalistic planning task in 56 children aged 7- to 12-years-old. Measures of planning, prospection, inhibition, crystallized intelligence, and fluid intelligence were collected in an individual differences study. Regression analyses showed that prospection (rather than traditional measures of intelligence or inhibition) predicted planning, suggesting that naturalistic planning tasks such as the Zoo Map task may rely on future-oriented cognitive processes rather than executive problem solving or general knowledge.
NASA Astrophysics Data System (ADS)
Zadeh, S. M.; Powers, D. M. W.; Sammut, K.; Yazdani, A. M.
2016-12-01
Autonomous Underwater Vehicles (AUVs) are capable of spending long periods of time for carrying out various underwater missions and marine tasks. In this paper, a novel conflict-free motion planning framework is introduced to enhance underwater vehicle's mission performance by completing maximum number of highest priority tasks in a limited time through a large scale waypoint cluttered operating field, and ensuring safe deployment during the mission. The proposed combinatorial route-path planner model takes the advantages of the Biogeography-Based Optimization (BBO) algorithm toward satisfying objectives of both higher-lower level motion planners and guarantees maximization of the mission productivity for a single vehicle operation. The performance of the model is investigated under different scenarios including the particular cost constraints in time-varying operating fields. To show the reliability of the proposed model, performance of each motion planner assessed separately and then statistical analysis is undertaken to evaluate the total performance of the entire model. The simulation results indicate the stability of the contributed model and its feasible application for real experiments.
A mission planning concept and mission planning system for future manned space missions
NASA Technical Reports Server (NTRS)
Wickler, Martin
1994-01-01
The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.
Rose, Danielle E; Tisnado, Diana M; Tao, May L; Malin, Jennifer L; Adams, John L; Ganz, Patricia A; Kahn, Katherine L
2012-06-01
Physician co-management, representing joint participation in the planning, decision-making, and delivery of care, is often cited in association with coordination of care. Yet little is known about how physicians manage tasks and how their management style impacts patient outcomes. To describe physician practice style using breast cancer as a model. We characterize correlates and predictors of physician practice style for 10 clinical tasks, and then test for associations between physician practice style and patient ratings of care. We queried 347 breast cancer physicians identified by a population-based cohort of women with incident breast cancer regarding care using a clinical vignette about a hypothetical 65-year-old diabetic woman with incident breast cancer. To test the association between physician practice style and patient outcomes, we linked medical oncologists' responses to patient ratings of care (physician n=111; patient n=411). After adjusting for physician and practice setting characteristics, physician practice style varied by physician specialty, practice setting, financial incentives, and barriers to referrals. Patients with medical oncologists who co-managed tasks had higher patient ratings of care. Physician practice style for breast cancer is influenced by provider and practice setting characteristics, and it is an important predictor of patient ratings. We identify physician and practice setting factors associated with physician practice style and found associations between physician co-management and patient outcomes (e.g., patient ratings of care). © Health Research and Educational Trust.
Brazilian adaptation of the Hotel Task: A tool for the ecological assessment of executive functions
Cardoso, Caroline de Oliveira; Zimmermann, Nicolle; Paraná, Camila Borges; Gindri, Gigiane; de Pereira, Ana Paula Almeida; Fonseca, Rochele Paz
2015-01-01
Over recent years, neuropsychological research has been increasingly concerned with the need to develop more ecologically valid instruments for the assessment of executive functions. The Hotel Task is one of the most widely used ecological measures of executive functioning, and provides an assessment of planning, organization, self-monitoring and cognitive flexibility. Objective The goal of this study was to adapt the Hotel Task for use in the Brazilian population. Methods The sample comprised 27 participants (three translators, six expert judges, seven healthy adults, ten patients with traumatic brain injuries and one hotel manager). The adaptation process consisted of five steps, which were repeated until a satisfactory version of the task was produced. The steps were as follows: (1) Translation; (2) Development of new stimuli and brainstorming among the authors; (3) Analysis by expert judges; (4) Pilot studies; (5) Assessment by an expert in business administration and hotel management. Results The adapted version proved adequate and valid for the assessment of executive functions. However, further research must be conducted to obtain evidence of the reliability, as well as the construct and criterion validity, sensitivity and specificity, of the Hotel Task. Conclusion Many neurological and/or psychiatric populations may benefit from the adapted task, since it may make significant contributions to the assessment of dysexecutive syndromes and their impact on patient functioning. PMID:29213957
Baldziki, Mike; Brown, Jeff; Chan, Hungching; Cheetham, T Craig; Conn, Thomas; Daniel, Gregory W; Hendrickson, Mark; Hilbrich, Lutz; Johnson, Ayanna; Miller, Steven B; Moore, Tom; Motheral, Brenda; Priddy, Sarah A; Raebel, Marsha A; Randhawa, Gurvaneet; Surratt, Penny; Walraven, Cheryl; White, T Jeff; Bruns, Kevin; Carden, Mary Jo; Dragovich, Charlie; Eichelberger, Bernadette; Rosato, Edith; Sega, Todd
2015-01-01
The Biologics Price Competition and Innovation Act, introduced as part of the Affordable Care Act, directed the FDA to create an approval pathway for biologic products shown to be biosimilar or interchangeable with an FDA-approved innovator drug. These biosimilars will not be chemically identical to the reference agent. Investigational studies conducted with biosimilar agents will likely provide limited real-world evidence of their effectiveness and safety. How do we best monitor effectiveness and safety of biosimilar products once approved by the FDA and used more extensively by patients? To determine the feasibility of developing a distributed research network that will use health insurance plan and health delivery system data to detect biosimilar safety and effectiveness signals early and be able to answer important managed care pharmacy questions from both the government and managed care organizations. Twenty-one members of the AMCP Task Force on Biosimilar Collective Intelligence Systems met November 12, 2013, to discuss issues involved in designing this consortium and to explore next steps. The task force concluded that a managed care biosimilars research consortium would be of significant value. Task force members agreed that it is best to use a distributed research network structurally similar to existing DARTNet, HMO Research Network, and Mini-Sentinel consortia. However, for some surveillance projects that it undertakes, the task force recognizes it may need supplemental data from managed care and other sources (i.e., a "hybrid" structure model). The task force believes that AMCP is well positioned to lead the biosimilar-monitoring effort and that the next step to developing a biosimilar-innovator collective intelligence system is to convene an advisory council to address organizational governance.
ERIC Educational Resources Information Center
Amiryousefi, Mohammad
2017-01-01
The current study aimed at investigating the effects of three types of prewriting planning conditions, namely teacher-monitored collaborative planning (TMCP), student-led collaborative planning (SLCP), and individual planning (IP) on EFL learners' computer-mediated L2 written production and learning transfer from a pedagogic task to a new task of…
NASA Technical Reports Server (NTRS)
Chappell, Steven P.; Abercromby, Andrew F.; Miller, Matthew J.; Halcon, Christopher; Gernhardt, Michael L.
2016-01-01
OBJECTIVES: NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of varying operations concepts and tasks type and complexity on representative communication latencies associated with Mars missions were studied. METHODS: 12 subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science backroom team (SBT) to provide input and direction during exploration activities. Exploration traverses were planned in advance based on precursor data collected. Subjects completed science-related tasks including presampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, SBT assimilation time (defined as time available for SBT to discuss data/imagery after it has been collected, in addition to the time taken to watch imagery streaming over latency). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for presampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across long communication latencies and can be done with minimal crew idle time. Imagery and information from the EVA crew that is transmitted real-time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide further instructions to the crew from a SBT on sampling priorities, additional tasks, and changes to the plan. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency. Autonomous crew planning tools can be effective at modifying existing plans if the objectives and constraints are clearly defined.
Yanaoka, Kaichi
2016-02-01
This research examined the effects of planning and executive functions on young children's (ages 3-to 5-years) strategies in changing scripts. Young children (N = 77) performed a script task (doll task), three executive function tasks (DCCS, red/blue task, and nine box task), a planning task, and a receptive vocabulary task. In the doll task, young children first enacted a "changing clothes" script, and then faced a situation in which some elements of the script were inappropriate. They needed to enact a script by compensating inappropriate items for the other-script items or by changing to the other script in advance. The results showed that shifting, a factor of executive function, had a positive influence on whether young children could compensate inappropriate items. In addition, planning was also an important factor that helped children to change to the other script in advance. These findings suggest that shifting and planning play different roles in using the two strategies appropriately when young children enact scripts in unexpected situations.
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
Resource Allocation with the Use of the Balanced Scorecard and the Triple Bottom Line in Education
ERIC Educational Resources Information Center
Nguyen, Chi Hong
2007-01-01
In terms of the economic bottom line, effective school leaders are now supposed to pay close attention to two central tasks which involve managing resources and devising operational strategies in their action plans. Taking a postmodern viewpoint, the first part of this paper aims to discuss the significance of resource allocation in education and…
ERIC Educational Resources Information Center
Kaya, Fatih; Delen, Erhan; Ritter, Nicola L.
2012-01-01
This article presents a review of the Children's Organizational Skills Scales (COSS) which were designed to assess how children organize their time, materials, and actions to accomplish important tasks at home and school. The scale quantifies children's skills in organization, time management, and planning (OTMP). The COSS is a multi-informant…
ERIC Educational Resources Information Center
Schumann, Wolfgang; Schwarz, Gerhard
This historical review considers the rise of the German Democratic Republic's (GDR) system of libraries since its inception in 1945. Sections detail the following: (1) background; (2) tasks of the state organs in the development of the library network, with attention to legislation, planning, and management of the system; (3) role of the GDR…
Voices of Women in the Field: External Factors Can Affect Goals
ERIC Educational Resources Information Center
Fuller, Nancy
2006-01-01
This author prided herself as being one who embraced change, and often became disgusted with her fellow teachers when they dragged their feet and resisted district initiatives. She also believed in setting goals and then managing the tasks that allows one to reach the goals. She thought it was merely a matter of purposeful planning, effort, and…
A Global Space Control Strategy
2014-12-01
ASAT testing and development before significant pushback is enacted. Further, a growing body of literature suggests that space-based intelligence...management process must be the foundation of plan- ning space operations and responses. Second, we must realize that in order to conduct effective space...end state where commanders considering multiple courses of action have a sensor architecture and a tasking, collection, processing , exploitation, and
Wildlife monitoring program plan
NASA Technical Reports Server (NTRS)
Sebesta, P.; Arno, R.
1979-01-01
A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.
ERIC Educational Resources Information Center
Piri, Faramarz; Barati, Hossein; Ketabi, Saeed
2012-01-01
Previous studies on the effect of planning on language production have revealed that planning does have a positive effect on language performance in terms of fluency, complexity, and accuracy. The present study was an attempt to investigate the effects of pre-task, on-line, and both pre-task and on-line planning on fluency, accuracy, and…
Xiao, Yan; Schenkel, Stephen; Faraj, Samer; Mackenzie, Colin F; Moss, Jacqueline
2007-10-01
Highly reliable, efficient collaborative work relies on excellent communication. We seek to understand how a traditional whiteboard is used as a versatile information artifact to support communication in rapid-paced, highly dynamic collaborative work. The similar communicative demands of the trauma operating suite and an emergency department (ED) make the findings applicable to both settings. We took photographs and observed staff's interaction with a whiteboard in a 6-bed surgical suite dedicated to trauma service. We analyzed the integral role of artifacts in cognitive activities as when workers configure and manage visual spaces to simplify their cognitive tasks. We further identified characteristics of the whiteboard as a communicative information artifact in supporting coordination in fast-paced environments. We identified 8 ways in which the whiteboard was used by physicians, nurses, and with other personnel to support collaborative work: task management, team attention management, task status tracking, task articulation, resource planning and tracking, synchronous and asynchronous communication, multidisciplinary problem solving and negotiation, and socialization and team building. The whiteboard was highly communicative because of its location and installation method, high interactivity and usability, high expressiveness, and ability to visualize transition points to support work handoffs. Traditional information artifacts such as whiteboards play significant roles in supporting collaborative work. How these artifacts are used provides insights into complicated information needs of teamwork in highly dynamic, high-risk settings such as an ED.
González-Ferrer, Arturo; ten Teije, Annette; Fdez-Olivares, Juan; Milian, Krystyna
2013-02-01
This paper describes a methodology which enables computer-aided support for the planning, visualization and execution of personalized patient treatments in a specific healthcare process, taking into account complex temporal constraints and the allocation of institutional resources. To this end, a translation from a time-annotated computer-interpretable guideline (CIG) model of a clinical protocol into a temporal hierarchical task network (HTN) planning domain is presented. The proposed method uses a knowledge-driven reasoning process to translate knowledge previously described in a CIG into a corresponding HTN Planning and Scheduling domain, taking advantage of HTNs known ability to (i) dynamically cope with temporal and resource constraints, and (ii) automatically generate customized plans. The proposed method, focusing on the representation of temporal knowledge and based on the identification of workflow and temporal patterns in a CIG, makes it possible to automatically generate time-annotated and resource-based care pathways tailored to the needs of any possible patient profile. The proposed translation is illustrated through a case study based on a 70 pages long clinical protocol to manage Hodgkin's disease, developed by the Spanish Society of Pediatric Oncology. We show that an HTN planning domain can be generated from the corresponding specification of the protocol in the Asbru language, providing a running example of this translation. Furthermore, the correctness of the translation is checked and also the management of ten different types of temporal patterns represented in the protocol. By interpreting the automatically generated domain with a state-of-art HTN planner, a time-annotated care pathway is automatically obtained, customized for the patient's and institutional needs. The generated care pathway can then be used by clinicians to plan and manage the patients long-term care. The described methodology makes it possible to automatically generate patient-tailored care pathways, leveraging an incremental knowledge-driven engineering process that starts from the expert knowledge of medical professionals. The presented approach makes the most of the strengths inherent in both CIG languages and HTN planning and scheduling techniques: for the former, knowledge acquisition and representation of the original clinical protocol, and for the latter, knowledge reasoning capabilities and an ability to deal with complex temporal and resource constraints. Moreover, the proposed approach provides immediate access to technologies such as business process management (BPM) tools, which are increasingly being used to support healthcare processes. Copyright © 2012 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frenkel, G.; Paterson, T.S.; Smith, M.E.
The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less
International Space Station ECLSS Technical Task Agreement Summary Report
NASA Technical Reports Server (NTRS)
Ray, C. D. (Compiler); Salyer, B. H. (Compiler)
1999-01-01
This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.
Interference due to shared features between action plans is influenced by working memory span.
Fournier, Lisa R; Behmer, Lawrence P; Stubblefield, Alexandra M
2014-12-01
In this study, we examined the interactions between the action plans that we hold in memory and the actions that we carry out, asking whether the interference due to shared features between action plans is due to selection demands imposed on working memory. Individuals with low and high working memory spans learned arbitrary motor actions in response to two different visual events (A and B), presented in a serial order. They planned a response to the first event (A) and while maintaining this action plan in memory they then executed a speeded response to the second event (B). Afterward, they executed the action plan for the first event (A) maintained in memory. Speeded responses to the second event (B) were delayed when it shared an action feature (feature overlap) with the first event (A), relative to when it did not (no feature overlap). The size of the feature-overlap delay was greater for low-span than for high-span participants. This indicates that interference due to overlapping action plans is greater when fewer working memory resources are available, suggesting that this interference is due to selection demands imposed on working memory. Thus, working memory plays an important role in managing current and upcoming action plans, at least for newly learned tasks. Also, managing multiple action plans is compromised in individuals who have low versus high working memory spans.
The K-8 Aeronautics Internet Testbook: Project Plan-Year 3
NASA Technical Reports Server (NTRS)
Pallis, Jani Macari
1997-01-01
The Project Plan - Year 3 includes: the major tasks and milestones, the assignment of tasks, and the key personnel assigned to each task, a description of the milestone and major task, and the deliverables for the project. Milestones have project numbers ending in "0.0", such as "25.0.0 Phase III Development". Major tasks under that milestone begin with the same first number such as, "25.0.1 Develop Future Of Aeronautics". The assignment of tasks included in the Year 3 project plan contains the names of the key personnel responsible for the task and others participating on the task. Although the PI has the overall and ultimately responsible for all the tasks and milestones, the name of the first individual on a task or milestone is the person responsible for that task. Other names listed under that task will be participating on the task. Since there are two individuals at Cislunar Aerospace, Inc. with the name "J. Pallis", the principal investigator, Jani Macari Pallis is designated as PI in the Project Plan and James Pallis is designated as J. Pallis.
NASA Technical Reports Server (NTRS)
Perkins, Sharon; Martin, Andrea; Bavinger, Bill
1990-01-01
The Trajectory Operations Applications Software Task (TOAST) is a software development project whose purpose is to provide trajectory operation pre-mission and real-time support for the Space Shuttle. The purpose of the evaluation was to evaluate TOAST as an Application Manager - to assess current and planned capabilities, compare capabilities to commercially-available off the shelf (COTS) software, and analyze requirements of MCC and Flight Analysis Design System (FADS) for TOAST implementation. As a major part of the data gathering for the evaluation, interviews were conducted with NASA and contractor personnel. Real-time and flight design users, orbit navigation users, the TOAST developers, and management were interviewed. Code reviews and demonstrations were also held. Each of these interviews was videotaped and transcribed as appropriate. Transcripts were edited and are presented chronologically.
Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1
NASA Technical Reports Server (NTRS)
Estes, Ronald H. (Editor)
1993-01-01
This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.
Validating the Electric Maze Task as a Measure of Planning
ERIC Educational Resources Information Center
Sheppard, Kelly W.; Cheatham, Carol L.
2017-01-01
The Electric Maze Task (EMT) is a novel planning task designed to allow flexible testing of planning abilities across a broad age range and to incorporate manipulations to test underlying planning abilities, such as working-memory and inhibitory control skills. The EMT was tested in a group of 63 typically developing 7- to 12-year-olds.…
Planning and Enacting Mathematical Tasks of High Cognitive Demand in the Primary Classroom
ERIC Educational Resources Information Center
Georgius, Kelly
2013-01-01
This study offers an examination of two primary-grades teachers as they learn to transfer knowledge from professional development into their classrooms. I engaged in planning sessions with each teacher to help plan tasks of high cognitive demand, including anticipating and planning for classroom discourse that would occur around the task. A…
Software Schedules Missions, Aids Project Management
NASA Technical Reports Server (NTRS)
2008-01-01
NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.
Science and Sandy: Lessons Learned
NASA Astrophysics Data System (ADS)
Werner, K.
2013-12-01
Following Hurricane Sandy's impact on the mid-Atlantic region, President Obama established a Task Force to '...ensure that the Federal Government continues to provide appropriate resources to support affected State, local, and tribal communities to improve the region's resilience, health, and prosperity by building for the future.' The author was detailed from NOAA to the Task Force between January and June 2013. As the Task Force and others began to take stock of the region's needs and develop plans to address them, many diverse approaches emerged from different areas of expertise including: infrastructure, management and construction, housing, public health, and others. Decision making in this environment was complex with many interests and variables to consider and balance. Although often relevant, science and technical expertise was not always at the forefront of this process. This talk describes the author's experience with the Sandy Task Force focusing on organizing scientific expertise to support the work of the Task Force. This includes a description of federal activity supporting Sandy recovery efforts, the role of the Task Force, and lessons learned from developing a science support function within the Task Force.
Hignett, Sue; Edmunds Otter, Mary; Keen, Christine
2016-07-01
To explore the safety risks associated with physical interactions between patients and caregivers during treatment and care delivery in Home Care settings. Seven-stage framework from the PRISMA statement for research question, eligibility (definition), search, identification of relevant papers from title and abstract, selection and retrieval of papers, appraisal and synthesis. British Nursing Index (BNI), Allied and Complementary Medicine Database (AMED), Applied Social Sciences Index and Abstracts (ASSIA), Cinahl, Cochrane Library, Embase, Ergonomics Abstracts, Health Business Elite, Health Management Information Consortium (HMIC), Medline, PsycInfo, Scopus, Social Care online, Social Science Citation Index. The included references (n=42) were critically appraised using a modified version of Downs and Black checklist and the Mixed Methods Appraisal Tool. The risk factors are reported using the modified model of human factors of health care in the home to represent the roles of both patients and caregivers in the system. The results are grouped as environment (health policy, physical and social), artefacts (equipment and technology), tasks (procedures and work schedules) and care recipient/provider. These include permanent and temporary building design and access, communication and lone working, provision of equipment and consumables, and clinical tasks. The topics with strong evidence from at least 2 papers relate to risks associated with awkward working positions, social environment issues (additional tasks and distractions), abuse and violence, inadequate team (peer) support, problems with workload planning, needle stick injuries and physical workload (moving and handling patients). As home care increases, there is a need to ensure the safety of both patients and caregivers with an understanding of the physical interactions and tasks to manage safety risks and plan safer care delivery systems. Copyright © 2016 Elsevier Ltd. All rights reserved.
An overview of the information management component of RICIS
NASA Technical Reports Server (NTRS)
Bishop, Peter C.
1987-01-01
Information management is the RICIS (Research Institute for Computing and Information Systems) research area which covers four types of tasks initiated during the first year of research: (1) surveys - a description of the existing state of some area in computing and information systems; (2) forecasts - a description of the alternative future states of some area; (3) plans - an approach to accomplishing some objective in the future; and (4) demonstrations - working prototypes and field trials to study the feasibility and the benefits of a particular information system. The activity in these research areas is described.
Data Management System (DMS) Evolution Analysis
NASA Technical Reports Server (NTRS)
Douglas, Katherine
1990-01-01
The all encompassing goal for the Data Management System (DMS) Evolution Analysis task is to develop an advocacy for ensuring that growth and technology insertion issues are properly and adequately addressed during DMS requirements specification, design, and development. The most efficient methods of addressing those issues are via planned and graceful evolution, technology transparency, and system growth margins. It is necessary that provisions, such as those previously mentioned, are made to accommodate advanced missions requirements (e.g., Human Space Exploration Programs) in addition to evolving Space Station Freedom operations and user requirements .
1996--1997 TEMA/DOE oversight annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-06-01
The Tennessee Emergency Management Agency (TEMA) has entered into a five-year agreement with the Department of Energy (DOE) to provide emergency response activities associated with the Oak Ridge Reservation (ORR). The Agreement in Principle (AIP) delineates the duties and responsibilities of the parties. The agreement tasked TEMA with the following responsibilities: develop offsite emergency plans; conduct emergency management training; develop offsite emergency organizations; develop emergency communications; develop emergency facilities; conduct exercises and drills; provide detection and protection equipment; and develop an emergency staff. This report describes progress on the 14 deliverables connected with this contract.
Hypoxia in the Northern Gulf of Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dale, Virginia H
2010-01-01
Since 1985, scientists have been documenting a hypoxic zone in the Gulf of Mexico each year. The hypoxic zone, an area of low dissolved oxygen that cannot support marine life, generally manifests itself in the spring. Since marine species either die or flee the hypoxic zone, the spread of hypoxia reduces the available habitat for marine species, which are important for the ecosystem as well as commercial and recreational fishing in the Gulf. Since 2001, the hypoxic zone has averaged 16,500 km{sup 2} during its peak summer months, an area slightly larger than the state of Connecticut, and ranged frommore » a low of 8,500 km{sup 2} to a high of 22,000 km{sup 2}. To address the hypoxia problem, the Mississippi River/Gulf of Mexico Watershed Nutrient Task Force (or Task Force) was formed to bring together representatives from federal agencies, states, and tribes to consider options for responding to hypoxia. The Task Force asked the White House Office of Science and Technology Policy to conduct a scientific assessment of the causes and consequences of Gulf hypoxia through its Committee on Environment and Natural Resources (CENR). In 2000 the CENR completed An Integrated Assessment: Hypoxia in the Northern Gulf of Mexico (or Integrated Assessment), which formed the scientific basis for the Task Force's Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico (Action Plan, 2001). In its Action Plan, the Task Force pledged to implement ten management actions and to assess progress every 5 years. This reassessment would address the nutrient load reductions achieved, the responses of the hypoxic zone and associated water quality and habitat conditions, and economic and social effects. The Task Force began its reassessment in 2005. In 2006 as part of the reassessment, USEPA's Office of Water, on behalf of the Task Force, requested that the U.S. Environmental Protection Agency (USEPA) Science Advisory Board (SAB) convene an independent panel to evaluate the state-of-the-science regarding hypoxia in the Northern Gulf of Mexico and potential nutrient mitigation and control options in the Mississippi-Atchafalaya River basin (MARB). The Task Force was particularly interested in scientific advances since the Integrated Assessment and posed questions in three areas: characterization of hypoxia; nutrient fate, transport and sources; and the scientific basis for goals and management options. The Hypoxia Study Group began its deliberations in September of 2006 and completed its report in August of 2007 while operating under the 'sunshine' requirements of the Federal Advisory Committee Act, which include providing public access to advisory meetings and opportunities for public comment. This Executive Summary summarizes the Hypoxia Study Group's major findings and recommendations.« less
Larson, Silva; De Freitas, Debora M; Hicks, Christina C
2013-03-15
Integrating people's values and perceptions into planning is essential for the successful management of natural resources. However, successful implementation of natural resources management decisions on the ground is a complex task, which requires a comprehensive understanding of a system's social and ecological linkages. This paper investigates the relationship between sense of place and people's attitudes towards their natural environment. Sense of place contributes towards shaping peoples' beliefs, values and commitments. Here, we set out to explore how these theoretical contributions can be operationalized for natural resources management planning in the Great Barrier Reef region of Australia. We hypothesise that the region's diverse range of natural resources, conservation values and management pressures might be reflected in people's attachment to place. To tests this proposition, variables capturing socio-demographics, personal wellbeing and a potential for sense of place were collected via mail-out survey of 372 residents of the region, and tested for relationships using multivariate regression and redundancy orientation analyses. Results indicate that place of residence within the region, involvement in community activities, country of birth and the length of time respondents lived in the region are important determinants of the values assigned to factors related to the natural environment. This type of information is readily available from National Census and thus could be incorporated into the planning of community engagement strategies early in the natural resources management planning process. A better understanding of the characteristics that allow sense of place meanings to develop can facilitate a better understanding of people's perceptions towards environmental and biodiversity issues. We suggest that the insights gained from this study can benefit environmental decision making and planning in the Great Barrier Reef region; and that sense of place is a concept worthy of further investigation elsewhere. Copyright © 2012 Elsevier Ltd. All rights reserved.
Controlling uncertainty: a review of human behavior in complex dynamic environments.
Osman, Magda
2010-01-01
Complex dynamic control (CDC) tasks are a type of problem-solving environment used for examining many cognitive activities (e.g., attention, control, decision making, hypothesis testing, implicit learning, memory, monitoring, planning, and problem solving). Because of their popularity, there have been many findings from diverse domains of research (economics, engineering, ergonomics, human-computer interaction, management, psychology), but they remain largely disconnected from each other. The objective of this article is to review theoretical developments and empirical work on CDC tasks, and to introduce a novel framework (monitoring and control framework) as a tool for integrating theory and findings. The main thesis of the monitoring and control framework is that CDC tasks are characteristically uncertain environments, and subjective judgments of uncertainty guide the way in which monitoring and control behaviors attempt to reduce it. The article concludes by discussing new insights into continuing debates and future directions for research on CDC tasks.
Developing a culturally competent health network: a planning framework and guide.
Gertner, Eric J; Sabino, Judith N; Mahady, Erica; Deitrich, Lynn M; Patton, Jarret R; Grim, Mary Kay; Geiger, James F; Salas-Lopez, Debbie
2010-01-01
The number of cultural competency initiatives in healthcare is increasing due to many factors, including changing demographics, quality improvement and regulatory requirements, equitable care missions, and accreditation standards. To facilitate organization-wide transformation, a hospital or healthcare system must establish strategic goals, objectives, and implementation tasks for culturally competent provision of care. This article reports the largely successful results of a cultural competency program instituted at a large system in eastern Pennsylvania. Prior to the development of its cultural competency initiative, Lehigh Valley Health Network, Allentown, Pennsylvania, saw isolated activities producing innovative solutions to diversity and culture issues in the provision of equitable care. But it took a transformational event to support an organization-wide program in cultural competency by strengthening leadership buy-in and providing a sense of urgency, excitement, and shared vision among multiple stakeholders. A multidisciplinary task force, including senior leaders and a diverse group of employees, was created with the authority and responsibility to enact changes. Through a well-organized strategic planning process, existing patient and community demographic data were reviewed to describe existing disparities, a baseline assessment was completed, a mission statement was created, and clear metrics were developed. The strategic plan, which focused on five key areas (demographics, language-appropriate services, employees, training, and education/communication), was approved by the network's chief executive officer and senior managers to demonstrate commitment prior to implementation. Strategic plan implementation proceeded through a project structure consisting of subproject teams charged with achieving the following specific objectives: develop a cultural material repository, enhance employee recruitment/retention, establish a baseline assessment, standardize data collection, provide language-appropriate services, and develop an education program. Change management and project management methodologies; defined roles and responsibilities; and specific, measurable, attainable, realistic, and time-bound goals were used in the implementation. This process has supported organizational change, thereby promoting high-quality, safe, and equitable care through widespread expectations of culturally competent care delivery across the entire network. Using this "ecologic approach" will ensure long-term success.
Automated plant, production management system
NASA Astrophysics Data System (ADS)
Aksenova, V. I.; Belov, V. I.
1984-12-01
The development of a complex of tasks for the operational management of production (OUP) within the framework of an automated system for production management (ASUP) shows that it is impossible to have effective computations without reliable initial information. The influence of many factors involving the production and economic activity of the entire enterprise upon the plan and course of production are considered. It is suggested that an adequate model should be available which covers all levels of the hierarchical system: workplace, section (bridgade), shop, enterprise, and the model should be incorporated into the technological sequence of performance and there should be provisions for an adequate man machine system.
Investigating the Effects of Planning on L2 Text Chat Performance
ERIC Educational Resources Information Center
Hsu, Hsiu-Chen
2012-01-01
Over the last decade, a small body of SLA research has examined the effects of task planning on L2 production. This research has revealed positive results concerning the effect of pre-task and online planning on oral and written production. However, no studies to date have investigated the joint effects of pre-task and online planning. In…
Freydefont, Laure; Gollwitzer, Peter M; Oettingen, Gabriele
2016-09-01
Two experiments investigate the influence of goal and implementation intentions on effort mobilization during task performance. Although numerous studies have demonstrated the beneficial effects of setting goals and making plans on performance, the effects of goals and plans on effort-related cardiac activity and especially the cardiac preejection period (PEP) during goal striving have not yet been addressed. According to the Motivational Intensity Theory, participants should increase effort mobilization proportionally to task difficulty as long as success is possible and justified. Forming goals and making plans should allow for reduced effort mobilization when participants perform an easy task. However, when the task is difficult, goals and plans should differ in their effect on effort mobilization. Participants who set goals should disengage, whereas participants who made if-then plans should stay in the field showing high effort mobilization during task performance. As expected, using an easy task in Experiment 1, we observed a lower cardiac PEP in both the implementation intention and the goal intention condition than in the control condition. In Experiment 2, we varied task difficulty and demonstrated that while participants with a mere goal intention disengaged from difficult tasks, participants with an implementation intention increased effort mobilization proportionally with task difficulty. These findings demonstrate the influence of goal striving strategies (i.e., mere goals vs. if-then plans) on effort mobilization during task performance. Copyright © 2016 Elsevier B.V. All rights reserved.
D Applications in Disaster Mitigation and Management: Core Results of Ditac Project
NASA Astrophysics Data System (ADS)
Kaptan, K.; Kavlak, U.; Yilmaz, O.; Celik, O. T.; Manesh, A. K.; Fischer, P.; Lupescu, O.; Ingrassia, P. L.; Ammann, W. J.; Ashkenazi, M.; Arculeo, C.; Komadina, R.; Lechner, K.; Arnim, G. v.; Hreckovski, B.
2013-08-01
According to statistical data, natural disasters as well as the number of people affected by them are occurring with increasing frequency compared to the past. This situation is also seen in Europe Union; So, Strengthening the EU capacity to respond to Disasters is very important. This paper represents the baseline results of the FP-7 founded DITAC project, which aims to develop a holistic and highly structured curriculum for responders and strategic crisis managers. Up-to-date geospatial information is required in order to create an effective disaster response plan. Common sources for geospatial information such as Google Earth, GIS databases, and aerial surveys are frequently outdated, or insufficient. This limits the effectiveness of disaster planning. Disaster Management has become an issue of growing importance. Planning for and managing large scale emergencies is complex. The number of both victims and relief workers is large and the time pressure is extreme. Emergency response and triage systems with 2D user interfaces are currently under development and evaluation. Disasters present a number of spatially related problems and an overwhelming quantity of information. 3D user interfaces are well suited for intuitively solving basic emergency response tasks. Such tasks include commanding rescue agents and prioritizing the disaster victims according to the severity of their medical condition. Further, 3D UIs hold significant potential for improving the coordination of rescuers as well as their awareness of relief workers from other organizations. This paper describes the outline of a module in a Disaster Management Course related to 3D Applications in Disaster Mitigation and Management. By doing this, the paper describes the gaps in existing systems and solutions. Satellite imageries and digital elevation data of Turkey are investigated for detecting sites prone to natural hazards. Digital image processing methods used to enhance satellite data and to produce morphometric maps in order to contribute to the detection of causal factors related to landslides, local site conditions influencing and/or experiencing earthquake damage intensity or those of tsunami and storm surge hazard sites at the coasts.
The Transition from VMS to Unix Operations for STScI's Science Planning and Scheduling Team
NASA Astrophysics Data System (ADS)
Adler, D. S.; Taylor, D. K.
The Science Planning and Scheduling Team of the Space Telescope Science Institute currently uses the VMS operating system. SPST began a transition to Unix-based operations in the summer of 1999. The main tasks for SPST to address in the Unix transition are: (1) converting the current SPST operational tools from DCL to Python; (2) converting our database report scripts from SQL; (3) adopting a Unix-based code management system; and (4) training the SPST staff. The goal is to fully transition the team to Unix operations by the end of 2001.
Rest requirements and rest management of personnel in shift work
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hammell, B.D.; Scheuerle, A.
1995-12-31
A difficulty-weighted shift assignment scheme is proposed for use in prolonged and strenuous field operations such as emergency response, site testing, and short term hazardous waste remediation projects. The purpose of the work rotation plan is to increase productivity, safety, and moral of workers. Job weighting is accomplished by assigning adjustments to the mental and physical intensity of the task, the protective equipment worn, and the climatic conditions. The plan is based on medical studies of sleep deprivation, the effects of rest adjustments, and programs to reduce sleep deprivation and normalize shift schedules.
From the microscope to the macroscopic: changing from the bench to portfolio management
Sachs, Michael
2017-01-01
A role in portfolio management is ideal for individuals who enjoy tackling challenges that have both technical and business components. Portfolio management provides objective insights and analytics to support research and development decision making and planning. Successful practitioners usually have strong analytical abilities developed from a background in either science or business. Portfolio managers often advise key decision makers at both the team and senior management level and thus require robust oral, written, and interpersonal communication skills. Day-to-day tasks are rarely the same, and comfort with change and the unknown is essential. Here I will discuss my experience as a portfolio manager in a larger biopharmaceutical company and the skills from academic research I leveraged to make the transition. PMID:29084911
Report by the International Space Station (ISS) Management and Cost Evaluation (IMCE) Task Force
NASA Technical Reports Server (NTRS)
Young, A. Thomas; Kellogg, Yvonne (Technical Monitor)
2001-01-01
The International Space Station (ISS) Management and Cost Evaluation Task Force (IMCE) was chartered to conduct an independent external review and assessment of the ISS cost, budget, and management. In addition, the Task Force was asked to provide recommendations that could provide maximum benefit to the U.S. taxpayers and the International Partners within the President's budget request. The Task Force has made the following principal findings: (1) The ISS Program's technical achievements to date, as represented by on-orbit capability, are extraordinary; (2) The Existing ISS Program Plan for executing the FY 02-06 budget is not credible; (3) The existing deficiencies in management structure, institutional culture, cost estimating, and program control must be acknowledged and corrected for the Program to move forward in a credible fashion; (4) Additional budget flexibility, from within the Office of Space Flight (OSF) must be provided for a credible core complete program; (5) The research support program is proceeding assuming the budget that was in place before the FY02 budget runout reduction of $1B; (6) There are opportunities to maximize research on the core station program with modest cost impact; (7) The U.S. Core Complete configuration (three person crew) as an end-state will not achieve the unique research potential of the ISS; (8) The cost estimates for the U.S.-funded enhancement options (e.g., permanent seven person crew) are not sufficiently developed to assess credibility. After these findings, the Task Force has formulated several primary recommendations which are published here and include: (1) Major changes must be made in how the ISS program is managed; (2) Additional cost reductions are required within the baseline program; (3) Additional funds must be identified and applied from the Human Space Flight budget; (4) A clearly defined program with a credible end-state, agreed to by all stakeholders, must be developed and implemented.
Managing Research in a Risk World
NASA Technical Reports Server (NTRS)
Anton, W.; Havenhill, M.
2014-01-01
The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.
NASA Technical Reports Server (NTRS)
Simon, Tom
2009-01-01
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
Predicting physiological capacity of human load carriage - a review.
Drain, Jace; Billing, Daniel; Neesham-Smith, Daniel; Aisbett, Brad
2016-01-01
This review article aims to evaluate a proposed maximum acceptable work duration model for load carriage tasks. It is contended that this concept has particular relevance to physically demanding occupations such as military and firefighting. Personnel in these occupations are often required to perform very physically demanding tasks, over varying time periods, often involving load carriage. Previous research has investigated concepts related to physiological workload limits in occupational settings (e.g. industrial). Evidence suggests however, that existing (unloaded) workload guidelines are not appropriate for load carriage tasks. The utility of this model warrants further work to enable prediction of load carriage durations across a range of functional workloads for physically demanding occupations. If the maximum duration for which personnel can physiologically sustain a load carriage task could be accurately predicted, commanders and supervisors could better plan for and manage tasks to ensure operational imperatives were met whilst minimising health risks for their workers. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.
Automated power management and control
NASA Technical Reports Server (NTRS)
Dolce, James L.
1991-01-01
A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.
ERIC Educational Resources Information Center
Juhri, A. M.; Tri, Y. H.; Agus, S.
2017-01-01
The study aims to obtain empirical evidence of the differences in the effectiveness of work on several aspects, including preparing and planning learning activities, the implementation of public administration, responsibility, and task. The study was carried out between the two groups, which were permanent and nonpermanent teachers in Muhamamdiyah…
David Pilliod
2004-01-01
Managers face a difficult task in predicting the effects of fuels treatments on wildlife populations, mostly because information on how animals respond to fuels treatments is scarce or does not exist. This paper discusses key considerations-aspects of an animal's ecology and available information-that, despite the scarcity of information, may make predictions of...
Yield model development project implementation plan
NASA Technical Reports Server (NTRS)
Ambroziak, R. A.
1982-01-01
Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.
THE INTERNATIONAL LEAGUE AGAINST EPILEPSY AT THE THRESHOLD OF ITS SECOND CENTURY: YEAR 1
MOSHÉ, Solomon L.; PERUCCA, EMILIO; WIEBE, SAMUEL; MATHERN, GARY W.
2010-01-01
In July 2009, the International League against Epilepsy (ILAE) developed its four-year strategic plan in collaboration with past, current, and future leaders (www.ilae-epilepsy.org). This is the first yearly progress report, prepared by the management committee and the chair of the Strategic Task Force, to highlight progress toward achieving the plan’s goals. PMID:21219305
The Effects of Guided vs. Unguided Pressured Planning on EFL Learners' Writing Fluency
ERIC Educational Resources Information Center
Mohammadnia, Zhila; Ayaz, Parisa
2015-01-01
Task-based planning can be conceptualized as the opportunity to work out task performance before the actual performance. It allows learners to process the content and language of their planned production at a deeper and more meaningful level. In the face of the wide range of research conducted on the effects of pre-task planning on L2 production,…
Railroad safety program, volume 1
NASA Technical Reports Server (NTRS)
1985-01-01
Since 1981, the Federal Railroad Administration (FRA) has annually prepared a National Inspection Plan (NIP) whose purpose is to summarize regional efforts to improve railroad transportation safety. The research concluded on the following tasks including the problems, conclusions and recommendations associated with these tasks is summarized: (1) the preparation of the 1983 NIP, with recommended procedures for improving future NIPs; (2) the development of an outline for the 1984 NIP, including a methodology for the allocation of inspection resources and other specialized regional activities; (3) the management and development of the 1984 NIP; and (4) the development of an instruction manual to be used in the preparation of future NIPs.
Comprehensive Fault Tolerance and Science-Optimal Attitude Planning for Spacecraft Applications
NASA Astrophysics Data System (ADS)
Nasir, Ali
Spacecraft operate in a harsh environment, are costly to launch, and experience unavoidable communication delay and bandwidth constraints. These factors motivate the need for effective onboard mission and fault management. This dissertation presents an integrated framework to optimize science goal achievement while identifying and managing encountered faults. Goal-related tasks are defined by pointing the spacecraft instrumentation toward distant targets of scientific interest. The relative value of science data collection is traded with risk of failures to determine an optimal policy for mission execution. Our major innovation in fault detection and reconfiguration is to incorporate fault information obtained from two types of spacecraft models: one based on the dynamics of the spacecraft and the second based on the internal composition of the spacecraft. For fault reconfiguration, we consider possible changes in both dynamics-based control law configuration and the composition-based switching configuration. We formulate our problem as a stochastic sequential decision problem or Markov Decision Process (MDP). To avoid the computational complexity involved in a fully-integrated MDP, we decompose our problem into multiple MDPs. These MDPs include planning MDPs for different fault scenarios, a fault detection MDP based on a logic-based model of spacecraft component and system functionality, an MDP for resolving conflicts between fault information from the logic-based model and the dynamics-based spacecraft models" and the reconfiguration MDP that generates a policy optimized over the relative importance of the mission objectives versus spacecraft safety. Approximate Dynamic Programming (ADP) methods for the decomposition of the planning and fault detection MDPs are applied. To show the performance of the MDP-based frameworks and ADP methods, a suite of spacecraft attitude planning case studies are described. These case studies are used to analyze the content and behavior of computed policies in response to the changes in design parameters. A primary case study is built from the Far Ultraviolet Spectroscopic Explorer (FUSE) mission for which component models and their probabilities of failure are based on realistic mission data. A comparison of our approach with an alternative framework for spacecraft task planning and fault management is presented in the context of the FUSE mission.
Review of Issues Associated with Safe Operation and Management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Johnstone, Paul M.; Blomberg, Richard D.; Gleghorn, George J.; Krone, Norris J.; Voltz, Richard A.; Dunn, Robert F.; Donlan, Charles J.; Kauderer, Bernard M.; Brill, Yvonne C.; Englar, Kenneth G.;
1996-01-01
At the request of the President of the United States through the Office of Science and Technology Policy (OSTP), the NASA Administrator tasked the Aerospace Safety Advisory Panel with the responsibility to identify and review issues associated with the safe operation and management of the Space Shuttle program arising from ongoing efforts to improve and streamline operations. These efforts include the consolidation of operations under a single Space Flight Operations Contract (SFOC), downsizing the Space Shuttle workforce and reducing costs of operations and management. The Panel formed five teams to address the potentially significant safety impacts of the seven specific topic areas listed in the study Terms of Reference. These areas were (in the order in which they are presented in this report): Maintenance of independent safety oversight; implementation plan for the transition of Shuttle program management to the Lead Center; communications among NASA Centers and Headquarters; transition plan for downsizing to anticipated workforce levels; implementation of a phased transition to a prime contractor for operations; Shuttle flight rate for Space Station assembly; and planned safety and performance upgrades for Space Station assembly. The study teams collected information through briefings, interviews, telephone conversations and from reviewing applicable documentation. These inputs were distilled by each team into observations and recommendations which were then reviewed by the entire Panel.
NASA Technical Reports Server (NTRS)
Keitz, J. F.
1982-01-01
The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This summary report discusses the results of each of the four major tasks of the study. Task 1 compared airline flight plans based on operational forecasts to plans based on the verifying analyses and found that average fuel savings of 1.2 to 2.5 percent are possible with improved forecasts. Task 2 consisted of similar comparisons but used a model developed for the FAA by SRI International that simulated the impact of ATc diversions on the flight plans. While parts of Task 2 confirm the Task I findings, inconsistency with other data and the known impact of ATC suggests that other Task 2 findings are the result of errors in the model. Task 3 compares segment weather data from operational flight plans with the weather actually observed by the aircraft and finds the average error could result in fuel burn penalties (or savings) of up to 3.6 percent for the average 8747 flight. In Task 4 an in-depth analysis of the weather forecast for the 33 days included in the study finds that significant errors exist on 15 days. Wind speeds in the area of maximum winds are underestimated by 20 to 50 kts., a finding confirmed in the other three tasks.
ERIC Educational Resources Information Center
Yildiz, Mine; Yesilyurt, Savas
2017-01-01
Based on Robinson's Triadic Componential Framework and the definition of task planning by Ellis (2005), this study was carried out to find out the effects of task planning and rhetorical mode on lexical and syntactic complexity, and overall writing quality of writing production of EFL learners. Following a repeated-measures design, the present…
NASA Astrophysics Data System (ADS)
Smith, R.; Kasprzyk, J. R.; Zagona, E. A.
2015-12-01
Instead of building new infrastructure to increase their supply reliability, water resource managers are often tasked with better management of current systems. The managers often have existing simulation models that aid their planning, and lack methods for efficiently generating and evaluating planning alternatives. This presentation discusses how multiobjective evolutionary algorithm (MOEA) decision support can be used with the sophisticated water infrastructure model, RiverWare, in highly constrained water planning environments. We first discuss a study that performed a many-objective tradeoff analysis of water supply in the Tarrant Regional Water District (TRWD) in Texas. RiverWare is combined with the Borg MOEA to solve a seven objective problem that includes systemwide performance objectives and individual reservoir storage reliability. Decisions within the formulation balance supply in multiple reservoirs and control pumping between the eastern and western parts of the system. The RiverWare simulation model is forced by two stochastic hydrology scenarios to inform how management changes in wet versus dry conditions. The second part of the presentation suggests how a broader set of RiverWare-MOEA studies can inform tradeoffs in other systems, especially in political situations where multiple actors are in conflict over finite water resources. By incorporating quantitative representations of diverse parties' objectives during the search for solutions, MOEAs may provide support for negotiations and lead to more widely beneficial water management outcomes.
Asymptotically Optimal Motion Planning for Learned Tasks Using Time-Dependent Cost Maps
Bowen, Chris; Ye, Gu; Alterovitz, Ron
2015-01-01
In unstructured environments in people’s homes and workspaces, robots executing a task may need to avoid obstacles while satisfying task motion constraints, e.g., keeping a plate of food level to avoid spills or properly orienting a finger to push a button. We introduce a sampling-based method for computing motion plans that are collision-free and minimize a cost metric that encodes task motion constraints. Our time-dependent cost metric, learned from a set of demonstrations, encodes features of a task’s motion that are consistent across the demonstrations and, hence, are likely required to successfully execute the task. Our sampling-based motion planner uses the learned cost metric to compute plans that simultaneously avoid obstacles and satisfy task constraints. The motion planner is asymptotically optimal and minimizes the Mahalanobis distance between the planned trajectory and the distribution of demonstrations in a feature space parameterized by the locations of task-relevant objects. The motion planner also leverages the distribution of the demonstrations to significantly reduce plan computation time. We demonstrate the method’s effectiveness and speed using a small humanoid robot performing tasks requiring both obstacle avoidance and satisfaction of learned task constraints. Note to Practitioners Motivated by the desire to enable robots to autonomously operate in cluttered home and workplace environments, this paper presents an approach for intuitively training a robot in a manner that enables it to repeat the task in novel scenarios and in the presence of unforeseen obstacles in the environment. Based on user-provided demonstrations of the task, our method learns features of the task that are consistent across the demonstrations and that we expect should be repeated by the robot when performing the task. We next present an efficient algorithm for planning robot motions to perform the task based on the learned features while avoiding obstacles. We demonstrate the effectiveness of our motion planner for scenarios requiring transferring a powder and pushing a button in environments with obstacles, and we plan to extend our results to more complex tasks in the future. PMID:26279642
Minimization In Digital Design As A Meta-Planning Problem
NASA Astrophysics Data System (ADS)
Ho, William P. C.; Wu, Jung-Gen
1987-05-01
In our model-based expert system for automatic digital system design, we formalize the design process into three sub-processes - compiling high-level behavioral specifications into primitive behavioral operations, grouping primitive operations into behavioral functions, and grouping functions into modules. Consideration of design minimization explicitly controls decision-making in the last two subprocesses. Design minimization, a key task in the automatic design of digital systems, is complicated by the high degree of interaction among the time sequence and content of design decisions. In this paper, we present an AI approach which directly addresses these interactions and their consequences by modeling the minimization prob-lem as a planning problem, and the management of design decision-making as a meta-planning problem.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-06-01
Following a planning period during which the Lawrence Livermore Laboratory and the Department of Defense managing sponsor, the USAF Materials Laboratory, agreed on work statements, the Department of Defense Tri-Service Precision Machine-Tool Program began in February 1978. Milestones scheduled for the first quarter have been met. Tasks and manpower requirements for two basic projects, precision-machining commercialization (PMC) and a machine-tool task force (MTTF), were defined. Progress by PMC includes: (1) documentation of existing precision machine-tool technology by initiation and compilation of a bibliography containing several hundred entries: (2) identification of the problems and needs of precision turning-machine builders and ofmore » precision turning-machine users interested in developing high-precision machining capability; and (3) organization of the schedule and content of the first seminar, to be held in October 1978, which will bring together representatives from the machine-tool and optics communities to address the problems and begin the process of high-precision machining commercialization. Progress by MTTF includes: (1) planning for the organization of a team effort of approximately 60 to 80 international experts to contribute in various ways to project objectives, namely, to summarize state-of-the-art cutting-machine-tool technology and to identify areas where future R and D should prove technically and economically profitable; (2) preparation of a comprehensive plan to achieve those objectives; and (3) preliminary arrangements for a plenary session, also in October, when the task force will meet to formalize the details for implementing the plan.« less
NASA Astrophysics Data System (ADS)
Dohaney, J. A.; kennedy, B.; Brogt, E.; Gravley, D.; Wilson, T.; O'Steen, B.
2011-12-01
This qualitative study investigates behaviors and experiences of upper-year geosciences undergraduate students during an intensive role-play simulation, in which the students interpret geological data streams and manage a volcanic crisis event. We present the development of the simulation, its academic tasks, (group) role assignment strategies and planned facilitator interventions over three iterations. We aim to develop and balance an authentic, intensive and highly engaging capstone activity for volcanology and geo-hazard courses. Interview data were collected from academic and professional experts in the fields of Volcanology and Hazard Management (n=11) in order to characterize expertise in the field, characteristics of key roles in the simulation, and to validate the authenticity of tasks and scenarios. In each iteration, observations and student artifacts were collected (total student participants: 68) along with interviews (n=36) and semi-structured, open-ended questionnaires (n=26). Our analysis of these data indicates that increasing the structure (i.e. organization, role-specific tasks and responsibilities) lessens non-productive group dynamics, which allows for an increase in difficulty of academic tasks within the simulation without increasing the cognitive load on students. Under these conditions, students exhibit professional expert-like behaviours, in particular in the quality of decision-making, communication skills and task-efficiency. In addition to illustrating the value of using this simulation to teach geosciences concepts, this study has implications for many complex situated-learning activities.
Task planning with uncertainty for robotic systems. Thesis
NASA Technical Reports Server (NTRS)
Cao, Tiehua
1993-01-01
In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.
Sustainable urban development in Brisbane City--the Holy Grail?
Rahman, K; Weber, T
2003-01-01
Impacts from urban stormwater runoff on receiving environments have been well documented, particularly through specific regional scientific studies. Using various local government planning and management elements, urban developments in Brisbane City are now able to address stormwater management in an increasingly holistic context. One key initiative includes facilitating Water Sensitive Urban Design (WSUD) components within an Integrated Water Management Strategy that looks at policy formation, planning strategies, design option, community marketing and acceptance, maintenance programs and finally evaluation of various WSUD approaches. These can include the use of Natural Channel Designs, grassed swales, bio-filtration systems, porous pavements and roofwater tanks in several economic combinations. By linking with the Cooperative Research Centre for Catchment Hydrology, Brisbane City Council has influenced the design of WSUD planning tools and benefited the city with academic inputs into extensive evaluation programs. As well, it has also contributed to the Cooperative Research Centre's research outcomes. These evaluation programs are increasingly providing better understanding of various stormwater quality best management practices throughout Australia. As part of the overall implementation process, active involvement by a range of stakeholders has been crucial. These stakeholders have included internal planning, development assessment and design staff, external consultants, developers, and other local and state government agencies. The latter two groups are assisting in the important task of "regionalisation" of Brisbane City Council's policies and guidelines. Implementation of WSUD initiatives and stormwater re-use strategies under Council's new "Integrated Water Management" agenda are showing some excellent results, suggesting that sustainable urban development is no longer like the search for the Holy Grail.
Zwirowicz-Rutkowska, Agnieszka; Michalik, Anna
2016-10-01
Today's technology plays a crucial role in the effective use of environmental information. This includes geographic information systems and infrastructures. The purpose of this research is to identify the way in which the Polish spatial data infrastructure (PSDI) supports policies and activities that may have an impact on the environment in relation to one group of users, namely urban planners, and their tasks concerning environmental management. The study is based on a survey conducted in July and August, 2014. Moreover, the authors' expert knowledge gained through urban development practice and the analysis of the environmental conservation regulations and spatial planning in Poland has been used to define the scope of environmental management in both spatial planning studies and spatial data sources. The research included assessment of data availability, infrastructure usability, and its impact on decision-making process. The results showed that the PSDI is valuable because it allows for the acquisition of data on environmental monitoring, agricultural and aquaculture facilities. It also has a positive impact on decision-making processes and improves numerous planners' activities concerning both the inclusion of environmental indicators in spatial plans and the support of nature conservation and environmental management in the process of working on future land use. However, even though the infrastructure solves certain problems with data accessibility, further improvements might be proposed. The importance of the SDI in environmental management is noticeable and could be considered from many standpoints: Data, communities engaged in policy or decision-making concerning environmental issues, and data providers.
Blowout control: Response, intervention and management; Part 2, Logistics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flak, L.H.; Wright, J.W.; Tuppen, J.A.
1993-12-01
This paper represents part two of a series regarding the development of emergency response and contingency plans for oil and gas well blowouts. The first paper dealt with developing plans to prevent blowouts and developing blowout task forces to respond when one occurred. This paper deals with the logistics of the transport of personnel and equipment to the blowout site. The paper describes a plan to identify the best sources of personnel, equipment, and services prior to a blowout. Services include methods for establishing emergency billing, cash flow and credit assistance, hazardous duty pay, welding and fabrication equipment, etc. Themore » paper also discusses the need to plan and establish base camps at the blowout sites, the logistics of establishing this base camp, and establishing viable communications to these base camps.« less
O'Nions, Elizabeth; Happé, Francesca; Evers, Kris; Boonen, Hannah; Noens, Ilse
2018-04-01
Although there is increasing research interest in the parenting of children with ASD, at present, little is known about everyday strategies used to manage problem behaviour. We conducted a meta-synthesis to explore what strategies parents use to manage irritability, non-compliance, challenging behaviour and anxiety in their children with ASD. Approaches included: (1) accommodating the child; (2) modifying the environment; (3) providing structure, routine and occupation; (4) supervision and monitoring; (5) managing non-compliance with everyday tasks; (6) responding to problem behaviour; (7) managing distress; (8) maintaining safety and (9) analysing and planning. Results suggest complex parenting demands in children with ASD and problem behaviour. Findings will inform the development of a new measure to quantify parenting strategies relevant to ASD.
An Internationally Coordinated Science Management Plan for Samples Returned from Mars
NASA Astrophysics Data System (ADS)
Haltigin, T.; Smith, C. L.
2015-12-01
Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.
Kenow, Kevin P.; Gretchen Benjamin,; Tim Schlagenhaft,; Ruth Nissen,; Mary Stefanski,; Gary Wege,; Scott A. Jutila,; Newton, Teresa J.
2016-01-01
The Upper Mississippi River (UMR) has been developed and subsequently managed for commercial navigation by the U.S. Army Corps of Engineers (USACE). The navigation pools created by a series of lock and dams initially provided a complex of aquatic habitats that supported a variety of fish and wildlife. However, biological productivity declined as the pools aged. The River Resources Forum, an advisory body to the St. Paul District of the USACE, established a multiagency Water Level Management Task Force (WLMTF) to evaluate the potential of water level management to improve ecological function and restore the distribution and abundance of fish and wildlife habitat. The WLMTF identified several water level management options and concluded that summer growing season drawdowns at the pool scale offered the greatest potential to provide habitat benefits over a large area. Here we summarize the process followed to plan and implement pool-wide drawdowns on the UMR, including involvement of stakeholders in decision making, addressing requirements to modify reservoir operating plans, development and evaluation of drawdown alternatives, pool selection, establishment of a monitoring plan, interagency coordination, and a public information campaign. Three pool-wide drawdowns were implemented within the St. Paul District and deemed successful in providing ecological benefits without adversely affecting commercial navigation and recreational use of the pools. Insights are provided based on more than 17 years of experience in planning and implementing drawdowns on the UMR.
Efficient Symbolic Task Planning for Multiple Mobile Robots
2016-12-13
Efficient Symbolic Task Planning for Multiple Mobile Robots Yuqian Jiang December 13, 2016 Abstract Symbolic task planning enables a robot to make...high-level deci- sions toward a complex goal by computing a sequence of actions with minimum expected costs. This thesis builds on a single- robot ...time complexity of optimal planning for multiple mobile robots . In this thesis we first investigate the performance of the state-of-the-art solvers of
NASA Technical Reports Server (NTRS)
Balaban, Edward; Orosz, Michael; Kichkaylo, Tatiana; Goforth, Andre; Sweet, Adam; Neches, Robert
2006-01-01
Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.
NASA Astrophysics Data System (ADS)
Klar, Jochen; Engelhardt, Claudia; Neuroth, Heike; Enke, Harry
2016-04-01
Following the call to make the results of publicly funded research openly accessible, more and more funding agencies demand the submission of a data management plan (DMP) as part of the application process. These documents specify, how the data management of the project is organized and what datasets will be published when. Of particular importance for European researchers is the Open Data Research Pilot of Horizon 2020 which requires data management plans for a set of 9 selected research fields from social sciences to nanotechnology. In order to assist the researchers creating these documents, several institutions developed dedicated software tools. The most well-known are DMPonline by the Digital Curation Centre (DCC) and DMPtool by the California Digital Library (CDL) - both extensive and well received web applications. The core functionality of these tools is the assisted editing of the DMP templates provided by the particular funding agency.While this is certainly helpful, especially in an environment with a plethora of different funding agencies like the UK or the USA, these tools are somewhat limited to this particular task and don't utilise the full potential of DMP. Beyond the purpose of fulfilling funder requirements, DMP can be useful for a number of additional tasks. In the initial conception phase of a project, they can be used as a planning tool to determine which date management activities and measures are necessary throughout the research process, to assess which resources are needed, and which institutions (computing centers, libraries, data centers) should be involved. During the project, they can act as a constant reference or guideline for the handling of research data. They also determine where the data will be stored after the project has ended and whether it can be accessed by the public, helping to take into account resulting requirements of the data center or actions necessary to ensure re-usability by others from early on. Ideally, a DMP acts as information source for all stakeholders involved during the complete life cycle of the project. The aim our project is the development of a web application called DMPwerkzeug, which enables this structured planning, implementation and administration of the research data management in a scientific project and, in addition, provides the scientist with a textual DMP. Building upon a generic set of content, DMPwerkzeug will be customizable to serve specific disciplinary and institutional requirements. The tool will not only be available at a central web site, but will be able to be installed and integrated into the existing infrastructure of a university or research institution. The tool will be multilingual, with a first version being published in English and German.
Continuous Risk Management: A NASA Program Initiative
NASA Technical Reports Server (NTRS)
Hammer, Theodore F.; Rosenberg, Linda
1999-01-01
NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.
The homeowner view of thinning methods for fire hazard reduction: more positive than many think
Sarah McCaffrey
2008-01-01
With the focus of the National Fire Plan on decreasing fire risk in the wildland-urban interface, fire managers are increasingly tasked with reducing the fuel load in areas where mixed public and private ownership and a growing number of homes can make most fuel reduction methods problematic at best. In many of these intermix areas, use of prescribed burning will be...
ERIC Educational Resources Information Center
Krishnamurthy, Ramesh S.; Mead, Clifford S.
1995-01-01
Presents plan of Oregon State University Libraries to convert all paper documents from the Ava Helen and Linus Pauling archives to digital format. The scope, goals, tasks and objectives set by the project coordinators are outlined, and issues such as protection of equipment, access, copyright and management are discussed. (JKP)
NASA Astrophysics Data System (ADS)
Colladay, R. S.; Carlisle, R. F.
1984-10-01
Some of the most significant advances made in the space station discipline technology program are examined. Technological tasks and advances in the areas of systems/operations, environmental control and life support systems, data management, power, thermal considerations, attitude control and stabilization, auxiliary propulsion, human capabilities, communications, and structures, materials, and mechanisms are discussed. An overview of NASA technology planning to support the initial space station and the evolutionary growth of the space station is given.
Adaptability in Crisis Management: The Role of Organizational Structure
2013-06-01
individuals to make optimal decisions under constraints of high risk, uncertainty, high workload, and time pressure (see, e.g., Brehmer, 2007 ). There is...et al., 2003; Hallam & Stammers , 1981). For instance, Hallam and Stammers (1981) showed that the impact of variations in task complexity on team...each team member. FIRESCOPE, a commonly used crisis intervention plan developed in California (Office of Emergency Services, 2007 ) is a good
Communication strategies and volunteer management for the IAU-OAD
NASA Astrophysics Data System (ADS)
Sankatsing Nava, Tibisay
2015-08-01
The IAU Office of Astronomy for Development will be developing a new communication strategy to promote its projects in a way that is relevant to stakeholders and the general public. Ideas include a magazine featuring best practices within the field of astronomy for development and setting up a workflow of communication that integrates the different outputs of the office and effectively uses the information collection tools developed by OAD team members.To accomplish these tasks the OAD will also develop a community management strategy with existing tools to effectively harness the skills of OAD volunteers for communication purposes. This talk will discuss the new communication strategy of the OAD as well the expanded community management plans.
Ada and software management in NASA: Assessment and recommendations
NASA Technical Reports Server (NTRS)
1989-01-01
Recent NASA missions have required software systems that are larger, more complex, and more critical than NASA software systems of the past. The Ada programming language and the software methods and support environments associated with it are seen as potential breakthroughs in meeting NASA's software requirements. The findings of a study by the Ada and Software Management Assessment Working Group (ASMAWG) are presented. The study was chartered to perform three tasks: (1) assess the agency's ongoing and planned Ada activities; (2) assess the infrastructure (standards, policies, and internal organizations) supporting software management and the Ada activities; and (3) present an Ada implementation and use strategy appropriate for NASA over the next 5 years.
A multi-agent architecture for geosimulation of moving agents
NASA Astrophysics Data System (ADS)
Vahidnia, Mohammad H.; Alesheikh, Ali A.; Alavipanah, Seyed Kazem
2015-10-01
In this paper, a novel architecture is proposed in which an axiomatic derivation system in the form of first-order logic facilitates declarative explanation and spatial reasoning. Simulation of environmental perception and interaction between autonomous agents is designed with a geographic belief-desire-intention and a request-inform-query model. The architecture has a complementary quantitative component that supports collaborative planning based on the concept of equilibrium and game theory. This new architecture presents a departure from current best practices geographic agent-based modelling. Implementation tasks are discussed in some detail, as well as scenarios for fleet management and disaster management.
Immediate and Sustained Effects of Planning in a Problem-Solving Task
ERIC Educational Resources Information Center
Delaney, Peter F.; Ericsson, K. Anders; Knowles, Martin E.
2004-01-01
In 4 experiments, instructions to plan a task (water jugs) that normally produces little planning altered how participants solved the problems and resulted in enhanced learning and memory. Experiment 1 identified planning strategies that allowed participants to plan full solutions to water jugs problems. Experiment 2 showed that experience with…
Nursing Home Self-assessment of Implementation of Emergency Preparedness Standards.
Lane, Sandi J; McGrady, Elizabeth
2016-08-01
Introduction Disasters often overwhelm a community's capacity to respond and recover, creating a gap between the needs of the community and the resources available to provide services. In the wake of multiple disasters affecting nursing homes in the last decade, increased focus has shifted to this vital component of the health care system. However, the long-term care sector has often fallen through the cracks in both planning and response. Problem Two recent reports (2006 and 2012) published by the US Department of Health and Human Services (DHHS), Office of Inspector General (OIG), elucidate the need for improvements in nursing homes' comprehensive emergency preparedness and response. The Center for Medicare and Medicaid Services (CMS) has developed an emergency preparedness checklist as a guidance tool and proposed emergency preparedness regulations. The purpose of this study was to evaluate the progress made in nursing home preparedness by determining the level of completion of the 70 tasks noted on the checklist. The study objectives were to: (1) determine the preparedness levels of nursing homes in North and South Carolina (USA), and (2) compare these findings with the 2012 OIG's report on nursing home preparedness to identify current gaps. A survey developed from the checklist of items was emailed to 418 North Carolina and 193 South Carolina nursing home administrators during 2014. One hundred seventeen were returned/"bounced back" as not received. Follow-up emails and phone calls were made to encourage participation. Sixty-three completed surveys and 32 partial surveys were received. Responses were compared to data obtained in a 2010 study to determine progress. Progress had been made in many of the overall planning and sheltering-in-place tasks, such as having contact information of local emergency managers as well as specifications for availability of potable water. Yet, gaps still persisted, especially in evacuation standards, interfacing with emergency management officials, establishing back-up evacuation sites and evacuation routes, identification of resident care items, and obtaining copies of state and local emergency planning regulations. Nursing homes have made progress in preparedness tasks, however, gaps persist. Compliance may prove challenging for some nursing homes, but closer integration with emergency management officials certainly is a step in the right direction. Further research that guides evacuation or shelter-in-place decision making is needed in light of persistent challenges in completing these tasks. Lane SJ , McGrady E . Nursing home self-assessment of implementation of emergency preparedness standards. Prehosp Disaster Med. 2016;31(4):422-431.
Reliability program requirements for aeronautical and space system contractors
NASA Technical Reports Server (NTRS)
1987-01-01
General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.
Roy, Christopher L; Rothschild, Jeffrey M; Dighe, Anand S; Schiff, Gordon D; Graydon-Baker, Erin; Lenoci-Edwards, Jennifer; Dwyer, Cheryl; Khorasani, Ramin; Gandhi, Tejal K
2013-11-01
The failure of providers to communicate and follow up clinically significant test results (CSTR) is an important threat to patient safety. The Massachusetts Coalition for the Prevention of Medical Errors has endorsed the creation of systems to ensure that results can be received and acknowledged. In 2008 a task force was convened that represented clinicians, laboratories, radiology, patient safety, risk management, and information systems in a large health care network with the goals of providing recommendations and a road map for improvement in the management of CSTR and of implementing this improvement plan during the sub-force sequent five years. In drafting its charter, the task broadened the scope from "critical" results to "clinically significant" ones; clinically significant was defined as any result that requires further clinical action to avoid morbidity or mortality, regardless of the urgency of that action. The task force recommended four key areas for improvement--(1) standardization of policies and definitions, (2) robust identification of the patient's care team, (3) enhanced results management/tracking systems, and (4) centralized quality reporting and metrics. The task force faced many challenges in implementing these recommendations, including disagreements on definitions of CSTR and on who should have responsibility for CSTR, changes to established work flows, limitations of resources and of existing information systems, and definition of metrics. This large-scale effort to improve the communication and follow-up of CSTR in a health care network continues with ongoing work to address implementation challenges, refine policies, prepare for a new clinical information system platform, and identify new ways to measure the extent of this important safety problem.
Strategic Science for Coral Ecosystems 2007-2011
,
2010-01-01
Shallow and deep coral ecosystems are being imperiled by a combination of stressors. Climate change, unsustainable fishing practices, and disease are transforming coral communities at regional to global scales. At local levels, excessive amounts of sediments, nutrients, and contaminants are also impacting the many benefits that healthy coral ecosystems provide. This Plan, Strategic Science for Coral Ecosystems, describes the information needs of resource managers and summarizes current research being conducted by U.S. Geological Survey (USGS) scientists and partners. It outlines important research actions that need to be undertaken over the next five years to achieve more accurate forecasting of future conditions and develop more effective decision-support tools to adaptively manage coral ecosystems. The overarching outcome of this Plan, if fully implemented, would be in transferring relevant knowledge to decision-makers, enabling them to better protect and sustain coral ecosystem services. These services include sources of food, essential habitat for fisheries and protected species, protection of coastlines from wave damage and erosion, recreation, and cultural values for indigenous communities. The USGS has a long history of research and monitoring experience in studying ancient and living coral communities and serving many stakeholders. The research actions in this Plan build on the USGS legacy of conducting integrated multidisciplinary science to address complex environmental issues. This Plan is responsive to Federal legislation and authorities and a variety of external and internal drivers that include the President's Ocean Action Plan, the recommendations of the Coral Reef Task Force, the information needs of Bureaus in the Department of Interior, the USGS Bureau Science Strategy (USGS 2007) and the formal plans of several USGS Programs. To achieve this Plan's desired outcomes will require increased funding and more effective coordination and collaboration among USGS managers and scientists within a national and international framework of partnerships in coral ecosystem science.
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Gallagher, Suzy; Granier, Martin
1984-01-01
A project is described which has as its goal the production of a set of system-independent, discipline-independent, transportable college level courses to educate science and engineering students in the use of large-scale information storage and retrieval systems. This project is being conducted with the cooperation and sponsorship of NASA by R and D teams at the University of Southwest Louisiana and Southern University. Chapter 1 is an introduction, providing an overview and a listing of the management phases. Chapter 2 furnishes general information regarding accomplishments in areas under development. Chapter 3 deals with the development of the course materials by presenting a series of diagrams and keys to depict the progress and interrelationships of various tasks and sub-tasks. Chapter 4 presents plans for activities to be conducted to complete and deliver course materials. The final chapter is a summary of project objectives, methods, plans, and accomplishments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-06-01
The conceptual design of an advanced central receiver power system using liquid sodium as a heat transport medium has been completed by a team consisting of the Energy Systems Group (prime contractor), McDonnell Douglas, Stearns-Roger, The University of Houston, and Salt River Project. The purpose of this study was to determine the technical and economic advantages of this concept for commercial-scale power plants. This final report covers all tasks of the project. These tasks were as follows: (1) review and analysis of preliminary specification; (2) parametric analysis; (3) select commercial configuration; (4) commercial plant conceptual design; (5) assessment of commercialmore » plant; (6) advanced central receiver power system development plan; (7) program plan; (8) reports and data; (9) program management; and (10) safety analysis. A programmatic overview of the accomplishments of this program is given. The 100-MW conceptual commercial plant, the 281-MW optimum plant, and the 10-MW pilot plant are described. (WHK)« less
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
Assessing family planning service-delivery skills in Kenya.
Valadez, J J; Transgrud, R; Mbugua, M; Smith, T
1997-06-01
This report demonstrates the use of Lot Quality Assurance Sampling (LQAS) to evaluate the technical competence of two cohorts of family planning service providers in Kenya trained with a new curriculum. One cohort had just finished training within two months of the study. The other cohort was the first group trained with the new curriculum about one year before the study. LQAS was adapted from industrial and other public health applications to assess both the individual competence of 30 service providers and the competence of each cohort. Results show that Cohorts One and Two did not differ markedly in the number of tasks needing improvement. However, both cohorts exhibited more tasks needing improvement in counseling skills as compared with physical examination skills or with all other skills. Care-givers who were not currently providing services accounted for most service-delivery problems. This result suggests that providers' use of their skills explains their ability to retain service-delivery skills learned in training to a greater degree than does the amount of time elapsed since they were trained. LQAS proved to be a rapid, easy-to-use empirical method for management decisionmaking for improvement of a family planning training curriculum and services.
Swift, Rachel D.; Anaokar, Sameer; Hegg, Lea Anne; Eggers, Rudolf; Cochi, Stephen L.
2017-01-01
Abstract Background. The Polio Eradication and Endgame Strategic Plan (PEESP) established a target that at least 50% of the time of personnel receiving funding from the Global Polio Eradication Initiative (GPEI) for polio eradication activities (hereafter, “GPEI-funded personnel”) should be dedicated to the strengthening of immunization systems. This article describes the self-reported profile of how GPEI-funded personnel allocate their time toward immunization goals and activities beyond those associated with polio, the training they have received to conduct tasks to strengthen routine immunization systems, and the type of tasks they have conducted. Methods. A survey of approximately 1000 field managers of frontline GPEI-funded personnel was conducted by Boston Consulting Group in the 10 focus countries of the PEESP during 2 phases, in 2013 and 2014, to determine time allocation among frontline staff. Country-specific reports on the training of GPEI-funded personnel were reviewed, and an analysis of the types of tasks that were reported was conducted. Results. A total of 467 managers responded to the survey. Forty-seven percent of the time (range, 23%–61%) of GPEI-funded personnel was dedicated to tasks related to strengthening immunization programs, other than polio eradication. Less time was spent on polio-associated activities in countries that had already interrupted wild poliovirus (WPV) transmission, compared with findings for WPV-endemic countries. All countries conducted periodic trainings of the GPEI-funded personnel. The types of non–polio-related tasks performed by GPEI-funded personnel varied among countries and included surveillance, microplanning, newborn registration and defaulter tracing, monitoring of routine immunization activities, and support of district immunization task teams, as well as promotion of health behaviors, such as clean-water use and good hygiene and sanitation practices. Conclusion. In all countries, GPEI-funded personnel perform critical tasks in the strengthening of routine immunization programs and the control of measles and rubella. In certain countries with very weak immunization systems, GPEI-funded personnel provide critical support for the immunization programs, and sudden discontinuation of their employment would potentially disrupt the immunization programs in their countries and create a setback in capacity and effectiveness that would put children at higher risk for vaccine-preventable diseases. PMID:28838165
van den Ent, Maya M V X; Swift, Rachel D; Anaokar, Sameer; Hegg, Lea Anne; Eggers, Rudolf; Cochi, Stephen L
2017-07-01
The Polio Eradication and Endgame Strategic Plan (PEESP) established a target that at least 50% of the time of personnel receiving funding from the Global Polio Eradication Initiative (GPEI) for polio eradication activities (hereafter, "GPEI-funded personnel") should be dedicated to the strengthening of immunization systems. This article describes the self-reported profile of how GPEI-funded personnel allocate their time toward immunization goals and activities beyond those associated with polio, the training they have received to conduct tasks to strengthen routine immunization systems, and the type of tasks they have conducted. A survey of approximately 1000 field managers of frontline GPEI-funded personnel was conducted by Boston Consulting Group in the 10 focus countries of the PEESP during 2 phases, in 2013 and 2014, to determine time allocation among frontline staff. Country-specific reports on the training of GPEI-funded personnel were reviewed, and an analysis of the types of tasks that were reported was conducted. A total of 467 managers responded to the survey. Forty-seven percent of the time (range, 23%-61%) of GPEI-funded personnel was dedicated to tasks related to strengthening immunization programs, other than polio eradication. Less time was spent on polio-associated activities in countries that had already interrupted wild poliovirus (WPV) transmission, compared with findings for WPV-endemic countries. All countries conducted periodic trainings of the GPEI-funded personnel. The types of non-polio-related tasks performed by GPEI-funded personnel varied among countries and included surveillance, microplanning, newborn registration and defaulter tracing, monitoring of routine immunization activities, and support of district immunization task teams, as well as promotion of health behaviors, such as clean-water use and good hygiene and sanitation practices. In all countries, GPEI-funded personnel perform critical tasks in the strengthening of routine immunization programs and the control of measles and rubella. In certain countries with very weak immunization systems, GPEI-funded personnel provide critical support for the immunization programs, and sudden discontinuation of their employment would potentially disrupt the immunization programs in their countries and create a setback in capacity and effectiveness that would put children at higher risk for vaccine-preventable diseases. © The Author 2017. Published by Oxford University Press for the Infectious Diseases Society of America.
Economic Techniques of Occupational Health and Safety Management
NASA Astrophysics Data System (ADS)
Sidorov, Aleksandr I.; Beregovaya, Irina B.; Khanzhina, Olga A.
2016-10-01
The article deals with the issues on economic techniques of occupational health and safety management. Authors’ definition of safety management is given. It is represented as a task-oriented process to identify, establish and maintain such a state of work environment in which there are no possible effects of hazardous and harmful factors, or their influence does not go beyond certain limits. It was noted that management techniques that are the part of the control mechanism, are divided into administrative, organizational and administrative, social and psychological and economic. The economic management techniques are proposed to be classified depending on the management subject, management object, in relation to an enterprise environment, depending on a control action. Technoeconomic study, feasibility study, planning, financial incentives, preferential crediting of enterprises, pricing, profit sharing and equity, preferential tax treatment for enterprises, economic regulations and standards setting have been distinguished as economic techniques.
Logistic Principles Application for Managing the Extraction and Transportation of Solid Minerals
NASA Astrophysics Data System (ADS)
Tyurin, Alexey
2017-11-01
Reducing the cost of resources in solid mineral extraction is an urgent task. For its solution the article proposes logistic approach use to management of mining company all resources, including extraction processes, transport, mineral handling and storage. The account of the uneven operation of mining, transport units and complexes for processing and loading coal into railroad cars allows you to identify the shortcomings in the work of the entire enterprise and reduce resources use at the planned production level. In the article the mining planning model taking into account the dynamics of the production, transport stations and export coal to consumers rail transport on example of Krasnoyarsk region Nazarovo JSC «Razrez Sereul'skiy». Rolling planning methods use and data aggregation allows you to split the planning horizon (month) on equal periods and to use of dynamic programming method for building mining optimal production programme for the month. Coal mining production program definition technique will help align the work of all enterprise units, to optimize resources of all areas, to establish a flexible relationship between manufacturer and consumer, to take into account the irregularity of rail transport.
Strategic and Unpressured Within-Task Planning and Their Associations with Working Memory
ERIC Educational Resources Information Center
Li, Shaofeng; Fu, Mengxia
2018-01-01
This study investigated the comparative effects of strategic and unpressured within-task planning on second language (L2) Chinese oral production and the role of working memory in mediating the effects of the two types of planning. Twenty-nine L2 Chinese learners at a large New Zealand university performed a narrative task after watching a…
NASA Technical Reports Server (NTRS)
Homem De Mello, Luiz S.; Sanderson, Arthur C.
1991-01-01
The authors introduce two criteria for the evaluation and selection of assembly plans. The first criterion is to maximize the number of different sequences in which the assembly tasks can be executed. The second criterion is to minimize the total assembly time through simultaneous execution of assembly tasks. An algorithm that performs a heuristic search for the best assembly plan over the AND/OR graph representation of assembly plans is discussed. Admissible heuristics for each of the two criteria introduced are presented. Some implementation issues that affect the computational efficiency are addressed.
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.
Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.
Rummel, Jan; Smeekens, Bridget A; Kane, Michael J
2017-07-01
Prospective memory (PM) is the cognitive ability to remember to fulfill intended action plans at the appropriate future moment. Current theories assume that PM fulfillment draws on attentional processes. Accordingly, pending PM intentions interfere with other ongoing tasks to the extent to which both tasks rely on the same processes. How do people manage the competition between PM and ongoing-task demands? Based on research relating mind wandering and attentional control (Kane & McVay, 2012), we argue that people may not only change the way they process ongoing-task stimuli when given a PM intention, but they may also engage in less off-task thinking than they otherwise would. That is, people focus more strongly on the tasks at hand and dedicate considerable conscious thought to the PM goal. We tested this hypothesis by asking subjects to periodically report on their thoughts during prototypical PM (and control) tasks. Task-unrelated thought rates dropped when participants performed an ongoing task while holding a PM intention versus performing the ongoing task alone (Experiment 1), even when PM demands were minimized (Experiment 2) and more so when PM execution was especially rewarded (Experiment 3). Our findings suggest that PM demands not only elicit a cost to ongoing-task processing, but they also induce a stronger on-task focus and promote conscious thoughts about the PM intention. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
Amphibian research and monitoring initiative: Concepts and implementation
Corn, P.S.; Adams, M.J.; Battaglin, W.A.; Gallant, Alisa L.; James, D.L.; Knutson, M.; Langtimm, C.A.; Sauer, J.R.
2005-01-01
This report provides the basis for discussion and subsequent articulation of a national plan for the Amphibian Research and Monitoring Initiative (ARMI). The authors were members of a task force formed from within the U.S. Geological Survey (USGS) that included scientists with expertise in biology, cartography, hydrology, and statistics. The assignment of the task force was to extend work begun by the National Amphibian Leadership Group. This group, composed of senior USGS scientists, managers, and external authorities, met in Gainesville, Florida, in February 20001. The product of this meeting was a document outlining the framework for a national program to monitor amphibian populations and to conduct research into the causes of declines.
The management of large cabling campaigns during the Long Shutdown 1 of LHC
NASA Astrophysics Data System (ADS)
Meroli, S.; Machado, S.; Formenti, F.; Frans, M.; Guillaume, J. C.; Ricci, D.
2014-03-01
The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.
NASA Astrophysics Data System (ADS)
Jin, Cheng-Jie; Wang, Wei; Jiang, Rui
2016-08-01
The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.
NASA Astrophysics Data System (ADS)
Hartmann, H.; Morino, K.; Bodner, G.; Markstein, A.; McFarlin, S.
2013-12-01
Land managers and communities struggle to sustain natural landscapes and the benefits they provide--especially in an era of rapid and unpredictable changes being driven by shifts in climate and other drivers that are largely outside the control of local managers and residents. The Cienega Watershed Partnership (CWP) is a long-standing multi-agency partnership involved in managing lands and resources over about 700,000 acres in southeast Arizona, surrounding the Bureau of Land Management's Las Cienegas National Conservation Area. The region forms a vital wildlife corridor connecting the diverse ecosystems of the Sonoran and Chihuahuan deserts and grasslands with the Sierra Madrean and Rocky Mountain forests and woodlands. The CWP has long-standing forums and relationships for considering complex issues and novel approaches for management, including practical implementation of adaptive management, development of monitoring programs and protocols, and the use of nested objectives to adjust management targets. However, current plans have objectives and strategies based on what is known or likely to become known about natural and socio-cultural systems; they do not incorporate uncertainties related to rapid changes in climate or have well developed feedback mechanisms for routinely reconsidering climate information. Since 2011, more than 50 individuals from over 20 federal and local governments, non-governmental organizations, and private landowners have participated in scenario planning for the Cienega Watershed. Scenario planning is an important tool for (1) managing risks in the face of high volatility, uncertainty, complexity, and ambiguity; (2) integrating quantitative climate projections, trend and impact assessments, and local expertise to develop qualitative scenario narratives that can inform decisions even by simply provoking insights; and (3) engaging jurisdictions having different missions, objectives, and planning processes. Participants are helping to extend and refine participatory scenario planning methods from the development of regional qualitative narratives to (1) development of scenario narratives that are relevant at the local management level, (2) creation and evaluation of portfolios of management options that can accommodate changes in management objectives, connect to formal agency planning processes, and that can be adjusted as the future evolves, and (3) explicit identification of the data and information that link qualitative narratives to quantitative scenario and adaptation assessments, which can be used to drive the timing and implementation of activities within the adaptation portfolios, and to prioritize monitoring and research activities to resolve near-term uncertainties. Project tasks are structured around four resource teams that focus on their specific management concerns (Montane, Riparian, Upland and Cultural), but that come together periodically to consider interaction and conflict among their scenarios or prospective adaptation. Participants are finding that embracing uncertainty enables them to approach climate change with a sense of empowerment rather than a sense of reacting to crises, and they appreciate the methods and opportunities for thinking differently and crossing boundaries that the scenario planning exercises provide.
Life sciences payload definition and integration study, task C and D. Volume 1: Management summary
NASA Technical Reports Server (NTRS)
1973-01-01
The findings of a study to define the required payloads for conducting life science experiments in space are presented. The primary objectives of the study are: (1) identify research functions to be performed aboard life sciences spacecraft laboratories and necessary equipment, (2) develop conceptual designs of potential payloads, (3) integrate selected laboratory designs with space shuttle configurations, and (4) establish cost analysis of preliminary program planning.
Annual Report to the President and the Congress
2004-01-01
planning process has determined is needed to meet the military tasks as- signed to the Department by the President in his national security strategy...Commands" document, which formally as- signs forces to combatant commanders. The Global Force Management Process subsumes two developmen- tal measures...www.t2net.org), which was signed by Deputy Secretary of Defense Paul Wolfowitz on June 10, 2003, is a road map to developing and fielding dynamic
Manpower Management: No Tiered Readiness - Enabling The Nation’s Force in Readiness
2013-04-09
physically qualified (medical, dental , panorex) 2,D, D,H,Q Pregnancy (after determination by proper authority) N Postpartum (up to six...identifying surfaces and gaps are elemental to both the Marine Corps Planning Process and this study, and assist in the overall problem framing. Manning...of the Marine Corps on T/Os. To assist the deputy commandants in this task, each occupational field retains an occupational field sponsor. The
Space station System Engineering and Integration (SE and I). Volume 2: Study results
NASA Technical Reports Server (NTRS)
1987-01-01
A summary of significant study results that are products of the Phase B conceptual design task are contained. Major elements are addressed. Study results applicable to each major element or area of design are summarized and included where appropriate. Areas addressed include: system engineering and integration; customer accommodations; test and program verification; product assurance; conceptual design; operations and planning; technical and management information system (TMIS); and advanced development.
Experiments using electronic display information in the NASA terminal configured vehicle
NASA Technical Reports Server (NTRS)
Morello, S. A.
1980-01-01
The results of research experiments concerning pilot display information requirements and visualization techniques for electronic display systems are presented. Topics deal with display related piloting tasks in flight controls for approach-to-landing, flight management for the descent from cruise, and flight operational procedures considering the display of surrounding air traffic. Planned research of advanced integrated display formats for primary flight control throughout the various phases of flight is also discussed.
2011-12-01
Task Based Approach to Planning.” Paper 08F- SIW -033. In Proceed- ings of the Fall Simulation Interoperability Workshop. Simulation Interoperability...Paper 06F- SIW -003. In Proceed- 2597 Blais ings of the Fall Simulation Interoperability Workshop. Simulation Interoperability Standards Organi...MSDL).” Paper 10S- SIW -003. In Proceedings of the Spring Simulation Interoperability Workshop. Simulation Interoperability Standards Organization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holt, V.L.; Burgoa, B.B.
1993-12-01
This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less
Marine data management: a positive evolution from JGOFS to OCEANS
NASA Astrophysics Data System (ADS)
Avril, B.
2003-04-01
The JGOFS project has been highly successful in providing new insights into global biogeochemical cycling of carbon and associated elements in the oceans through a multi-national effort at the regional scale (process studies in the North Atlantic, Arabian Sea, Equatorial Pacific, Southern Ocean and North Pacific), global scale (carbon survey) and from long-term measurements at key ocean sites (time-series). The database thus created is very large and complex in diversity and format, and it is currently managed at the international level, thank to the efforts of the JGOFS Data Management Task Team. To be fully usable for current and future studies, the JGOFS datasets will be organised as a single database (so-called, the International JGOFS Master Dataset), in a single format and in a single location (in the World Data Centre (WDC) system, thanks to an initiative of PANGAEA / WDC-MARE; and on CDs or DVDs) before the end of the project (Dec. 2003). This should be achieved by adapting previously developed tools, especially from the US-JGOFS DMO (for the user query interface) and from ODV/PANGAEA (for the datasets visualization and metadata handling). Whilst the OCEANS project science and implementation plans are being prepared, the international oceanographic community is now hoping to benefit from the JGOFS data management experience and to elaborate beforehand the best design and practices for its data management. The draft OCEANS data management plan (international data policy and recommendations for participating international agencies and national data managers) is presented. This plan should result in the rapid and full availability of data, and its long-term preservation and accessibility, thanks to a better, integrated and fully implemented data management system.
Micromanagement--a costly management style.
Collins, Sandra K; Collins, Kevin S
2002-01-01
Micromanagement can be advantageous in certain short-term situations, such as while training new employees, increasing productivity of underperforming employees, controlling high-risk issues, and when there can be no question of who is in charge. However, the costs associated with long-term micromanagement can be exorbitant. Symptoms such as low employee morale, high staff turnover, reduction of productivity and patient dissatisfaction can be associated with micromanagement. The negative impacts are so intense that it is labeled among the top three reasons employees resign. Ultimately, micromanagement leads to decreased growth potential in a department. Managers who put too much emphasis on daily operational details can miss the broader picture and fail to plan for departmental expansion. Eventually, many micromanagers find themselves at considerable risk of burnout. Changing behavior associated with micromanagement can be a lengthy and difficult process. As with most problems, the first step is to realize that there is behavior that needs to be changed and to understand how it negatively impacts the department. Conducting a self-assessment of one's leadership style can be advantageous in this process. The true task is to find a balance between effectively performing daily obligations and strategically planning for the future. This task typically involves proper delegation of duties, and that in itself is a difficult challenge. Proper delegation of tasks may be the primary key to combating micromanaging behavior, however, some other suggestions include: 1. Develop a vision of what the department will look like in the future. 2. Hire people with the right skills for the job. 3. Develop a policy and procedures manual. 4. Develop solid lines of communication between managers and subordinates. 5. Expect some employee errors. Mistakes are an important process in the learning experience and should be viewed as a training expense. Employees who are allowed to be self-directed will be motivated to be more productive. Staffing issues such as low morale and high turnover will decrease; patient satisfaction will increase simultaneously.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conley, Will
2004-01-01
The overall goal of the Klickitat Watershed Enhancement Project (KWEP) is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of stream reaches and watersheds supporting native anadromous fish production, particularly steelhead (Oncorhyncus mykiss; ESA- listed as 'Threatened' within the Mid-Columbia ESU) and spring Chinook (O. tshawytscha). Habitat restoration activities in the Klickitat subbasin augment goals and objectives of the Yakima Klickitat Fisheries Project (YKFP), NPPC Fish and Wildlife Program, Klickitat Subbasin Summary and the NMFS Biological Opinion (All-H paper). Work is conducted to enhance instream andmore » contributing upland habitat to facilitate increased natural production potential for native salmonid stocks. Efforts in the Klickitat Subbasin fall into two main categories: (1) identification and prioritization of sites for protection and restoration activities, (2) implementation of protection and restoration measures. KWEP personnel also assist monitoring efforts of the YKFP Monitoring & Evaluation Project. During the September 2002-August 2003 reporting period, KWEP personnel continued efforts to address feedback from the August 2000 Provincial Review that indicated a need for better information management and development of geographic priorities by: (1) Assisting development of the Strategic Habitat Plan for the Klickitat Lead Entity (Task A3.1) and Klickitat steelhead EDT model (Task A4.1); (2) Improving the functionality of reference point, habitat unit, and large woody debris modules of the habitat database as well as addition of a temperature module (Tasks A1.1-1.2); (3) Continuing development and acquisition of GIS data (Task A1.3); (4) Ongoing data collection efforts to fill information gaps including streamflow, habitat, and temperature (Objectives C1 and C2); and (5) Completion of planning, field work, and hydrologic modeling associated with roads assessment in the White Creek watershed (Task A4.2). Significant milestones associated with restoration projects during the reporting period included: (1) Completion of the Surveyors Fish Creek Passage Enhancement project (Task B2.3); (2) Completion of interagency agreements for the Klickitat Meadows (Task B2.4) and Klickitat Mill (Task B2.10) projects; (3) Completion of topographic surveys for the Klickitat Meadows (Task B2.4), Klickitat River Meadows (Task B2.5), Trout Creek and Bear Creek culvert replacements (Task B2.7), and Snyder Swale II (Task B2.13) projects; (4) Completion of the Snyder Swale II - Phase 1 project (Task B2.13); (5) Completion of design, planning, and permitting for the Klickitat Mill project (Task B2.10) and initiation of construction; (6) Design for the Trout and Bear Creek culverts (B2.7) were brought to the 60% level; and (7) Completion of design work for the for the Klickitat Meadows (Task B2.4) and Klickitat River Meadows (Task B2.5) projects.« less
Determining robot actions for tasks requiring sensor interaction
NASA Technical Reports Server (NTRS)
Budenske, John; Gini, Maria
1989-01-01
The performance of non-trivial tasks by a mobile robot has been a long term objective of robotic research. One of the major stumbling blocks to this goal is the conversion of the high-level planning goals and commands into the actuator and sensor processing controls. In order for a mobile robot to accomplish a non-trivial task, the task must be described in terms of primitive actions of the robot's actuators. Most non-trivial tasks require the robot to interact with its environment; thus necessitating coordination of sensor processing and actuator control to accomplish the task. The main contention is that the transformation from the high level description of the task to the primitive actions should be performed primarily at execution time, when knowledge about the environment can be obtained through sensors. It is proposed to produce the detailed plan of primitive actions by using a collection of low-level planning components that contain domain specific knowledge and knowledge about the available sensors, actuators, and sensor/actuator processing. This collection will perform signal and control processing as well as serve as a control interface between an actual mobile robot and a high-level planning system. Previous research has shown the usefulness of high-level planning systems to plan the coordination of activities such to achieve a goal, but none have been fully applied to actual mobile robots due to the complexity of interacting with sensors and actuators. This control interface is currently being implemented on a LABMATE mobile robot connected to a SUN workstation and will be developed such to enable the LABMATE to perform non-trivial, sensor-intensive tasks as specified by a planning system.
Information Architecture for Quality Management Support in Hospitals.
Rocha, Álvaro; Freixo, Jorge
2015-10-01
Quality Management occupies a strategic role in organizations, and the adoption of computer tools within an aligned information architecture facilitates the challenge of making more with less, promoting the development of a competitive edge and sustainability. A formal Information Architecture (IA) lends organizations an enhanced knowledge but, above all, favours management. This simplifies the reinvention of processes, the reformulation of procedures, bridging and the cooperation amongst the multiple actors of an organization. In the present investigation work we planned the IA for the Quality Management System (QMS) of a Hospital, which allowed us to develop and implement the QUALITUS (QUALITUS, name of the computer application developed to support Quality Management in a Hospital Unit) computer application. This solution translated itself in significant gains for the Hospital Unit under study, accelerating the quality management process and reducing the tasks, the number of documents, the information to be filled in and information errors, amongst others.
Familiarity and Personal Experience as Mediators of Recall when Planning for Future Contingencies
ERIC Educational Resources Information Center
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.; Lax, Moshe L.
2012-01-01
In this article, we demonstrate that planning tasks enhance recall when the context of planning (a) is self-referential and (b) draws on familiar scenarios represented in episodic memory. Specifically, we show that when planning tasks are sorted according to the degree to which they evoke memories of personally familiar scenarios (e.g., planning a…
State landscape in public health planning and quality improvement: results of the ASTHO survey.
Madamala, Kusuma; Sellers, Katie; Pearsol, Jim; Dickey, Michael; Jarris, Paul E
2010-01-01
Limited data exist on state public health agencies and their use of planning and quality improvement (QI) initiatives. Using the 2007 Association of State and Territorial Health Officials (ASTHO) State Public Health Survey, this article describes how state public health agencies perform tasks related to planning, performance management (PM), and QI. While 82 percent of respondents report having a QI process in place, only 9.8 percent have it fully implemented departmentwide. Seventy-six percent reported having a PM process in place, with 16 percent (n = 8) having it fully implemented departmentwide. A state health improvement plan was used by 80.4 percent of respondents, with 56.9 percent of respondents completing the plan more than 3 years ago. More than two-thirds (68.2%) of the respondents developed the plan by using results of their state health assessment. Analysis of state health department level planning, PM, and QI initiatives can inform states' efforts to ready themselves to meet the proposed national voluntary accreditation standards of the Public Health Accreditation Board.
China's territorial planning problems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cheng Lu
1983-09-01
This article examines China's territorial planning problems. The task of developing and managing national territory means effectively linking manpower resources and natural resources, and accurately coordinating the relationship between man and the natural world. The goals are to examine the state of the national territory, to adapt general methods to local situations in developing soil, water, climatic, biological, mineral, and marine resources, and to develop and allocate productivity in an equitable way. Topics considered include economic zoning as a foundation for national territorial planning, and national territorial plans as a basis for national economic long-range planning. Economic zoning (which ismore » zoning of the entire economy, and which differs from zoning for farming, forestry, and water conservancy) is based on China's natural resources and population distribution, the existing economic foundation for industrial and agricultural production, the condition of communications and transportation, existing major economic centers, and historically formed economic relationships, with the provinces constituting a unit (for convenience in providing direction and making plans). Economic zoning highlights a region's characteristics, points the way toward its economic development, and also provides a scientific basis for territorial planning.« less
Miller, Christopher A; Parasuraman, Raja
2007-02-01
To develop a method enabling human-like, flexible supervisory control via delegation to automation. Real-time supervisory relationships with automation are rarely as flexible as human task delegation to other humans. Flexibility in human-adaptable automation can provide important benefits, including improved situation awareness, more accurate automation usage, more balanced mental workload, increased user acceptance, and improved overall performance. We review problems with static and adaptive (as opposed to "adaptable") automation; contrast these approaches with human-human task delegation, which can mitigate many of the problems; and revise the concept of a "level of automation" as a pattern of task-based roles and authorizations. We argue that delegation requires a shared hierarchical task model between supervisor and subordinates, used to delegate tasks at various levels, and offer instruction on performing them. A prototype implementation called Playbook is described. On the basis of these analyses, we propose methods for supporting human-machine delegation interactions that parallel human-human delegation in important respects. We develop an architecture for machine-based delegation systems based on the metaphor of a sports team's "playbook." Finally, we describe a prototype implementation of this architecture, with an accompanying user interface and usage scenario, for mission planning for uninhabited air vehicles. Delegation offers a viable method for flexible, multilevel human-automation interaction to enhance system performance while maintaining user workload at a manageable level. Most applications of adaptive automation (aviation, air traffic control, robotics, process control, etc.) are potential avenues for the adaptable, delegation approach we advocate. We present an extended example for uninhabited air vehicle mission planning.
Comprehensive planning of data archive in Japanese planetary missions
NASA Astrophysics Data System (ADS)
Yamamoto, Yukio; Shinohara, Iku; Hoshino, Hirokazu; Tateno, Naoki; Hareyama, Makoto; Okada, Naoki; Ebisawa, Ken
Comprehensive planning of data archive in Japanese planetary missions Japan Aerospace Exploration Agency (JAXA) provides HAYABUSA and KAGUYA data as planetary data archives. These data archives, however, were prepared independently. Therefore the inconsistency of data format has occurred, and the knowledge of data archiving activity is not inherited. Recently, the discussion of comprehensive planning of data archive has started to prepare up-coming planetary missions, which indicates the comprehensive plan of data archive is required in several steps. The framework of the comprehensive plan is divided into four items: Preparation, Evaluation, Preservation, and Service. 1. PREPARATION FRAMEWORK Data is classified into several types: raw data, level-0, 1, 2 processing data, ancillary data, and etc. The task of mission data preparation is responsible for instrument teams, but preparations beside mission data and support of data management are essential to make unified conventions and formats over instruments in a mission, and over missions. 2. EVALUATION FRAMEWORK There are two meanings of evaluation: format and quality. The format evaluation is often discussed in the preparation framework. The data quality evaluation which is often called quality assurance (QA) or quality control (QC) must be performed by third party apart from preparation teams. An instrument team has the initiative for the preparation itself, and the third-party group is organized to evaluate the instrument team's activity. 3. PRESERVATION FRAMEWORK The main topic of this framework is document management, archiving structure, and simple access method. The mission produces many documents in the process of the development. Instrument de-velopment is no exception. During long-term development of a mission, many documents are obsoleted and updated repeatedly. A smart system will help instrument team to reduce some troubles of document management and archiving task. JAXA attempts to follow PDS manners to do this management since PDS has highly sophisticated archiving structure. In addition, the access method to archived data must be simple and standard well over a decade. 4. SERVICE FRAMEWORK The service framework including planetary data access protocol, PDAP, has been developed to share a stored data effectively. The sophisticated service framework will work not only for publication data, but also for low-level data. JAXA's data query services is under developed based on PDAP, which means that the low-level data can be published in the same manner as level 2 data. In this presentation, we report the detail structure of these four frameworks adopting upcoming Planet-C, Venus Climate Orbiter, mission.
Discharge Planning Revisited: What Do Social Workers Actually Do in Discharge Planning?
ERIC Educational Resources Information Center
Kadushin, Goldie; Kulys, Regina
1993-01-01
Interviewed 80 social workers in 36 acute care hospitals concerning amount of time they spent on and importance of 73 discharge planning tasks. Findings suggest that discharge planning comprises primarily concrete resource provision with counseling component focused on decision making. Time spent on tasks was influenced by prospective payment…
A Test of Motor (Not Executive) Planning in Developmental Coordination Disorder and Autism
ERIC Educational Resources Information Center
van Swieten, Lisa M.; van Bergen, Elsje; Williams, Justin H. G.; Wilson, Andrew D.; Plumb, Mandy S.; Kent, Samuel W.; Mon-Williams, Mark A.
2010-01-01
Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between "motor" and "executive" planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or anticlockwise.…
ERIC Educational Resources Information Center
Ahmadian, Mohammad Javad; Tavakoli, Mansoor
2011-01-01
This article reports on a study that was primarily aimed at investigating the effects of simultaneous use of careful online planning and task repetition on accuracy, complexity, and fluency in the oral production of learners of English as a foreign language (EFL). The effects of four planning and task repetition conditions (i.e. careful online…
Planning Abilities in Bilingual and Monolingual Children: Role of Verbal Mediation.
Gangopadhyay, Ishanti; McDonald, Margarethe; Ellis Weismer, Susan; Kaushanskaya, Margarita
2018-01-01
We examined the role of verbal mediation in planning performance of English-Spanish-speaking bilingual children and monolingual English-speaking children, between the ages of 9 and 12 years. To measure planning, children were administered the Tower of London (ToL) task. In a dual-task paradigm, children completed ToL problems under three conditions: with no secondary task (baseline), with articulatory suppression, and with non-verbal motor suppression. Analyses revealed generally shorter planning times for bilinguals than monolinguals but both groups performed similarly on number of moves and execution times. Additionally, bilingual children were more efficient at planning throughout the duration of the task while monolingual children showed significant gains with more practice. Children's planning times under articulatory suppression were significantly shorter than under motor suppression as well as the baseline condition, and there was no difference in planning times between monolingual and bilingual children during articulatory suppression. These results demonstrate that bilingualism influences performance on a complex EF measure like planning, and that these effects are not related to verbal mediation.
Planning Abilities in Bilingual and Monolingual Children: Role of Verbal Mediation
Gangopadhyay, Ishanti; McDonald, Margarethe; Ellis Weismer, Susan; Kaushanskaya, Margarita
2018-01-01
We examined the role of verbal mediation in planning performance of English–Spanish-speaking bilingual children and monolingual English-speaking children, between the ages of 9 and 12 years. To measure planning, children were administered the Tower of London (ToL) task. In a dual-task paradigm, children completed ToL problems under three conditions: with no secondary task (baseline), with articulatory suppression, and with non-verbal motor suppression. Analyses revealed generally shorter planning times for bilinguals than monolinguals but both groups performed similarly on number of moves and execution times. Additionally, bilingual children were more efficient at planning throughout the duration of the task while monolingual children showed significant gains with more practice. Children’s planning times under articulatory suppression were significantly shorter than under motor suppression as well as the baseline condition, and there was no difference in planning times between monolingual and bilingual children during articulatory suppression. These results demonstrate that bilingualism influences performance on a complex EF measure like planning, and that these effects are not related to verbal mediation. PMID:29593620
Dehne, K. L.; Snow, R.; O'Reilly, K. R.
2000-01-01
It has been widely believed that, by combining the services for preventing and treating sexually transmitted infections (STI) with those for family planning (FP), STI coverage would increase and the combined service would be of higher quality and more responsive to the needs of women. So far, there is little concrete evidence that integration has had such an impact. Besides the absence of documentation, a clear definition of integration is lacking. We therefore carried out a comprehensive review of concrete experiences with integrated services, and present a summary of our findings in this article. The results indicate that the tasks of STI prevention, such as education for risk reduction and counselling, have been integrated into family planning services much more frequently than the tasks of STI diagnosis and treatment. Some STI/FP integration efforts appear to have been beneficial, for instance when the integration of STI/HIV prevention had a positive impact on client satisfaction, and on the acceptance of family planning. Less clear is whether STI prevention, when concentrated among traditional FP clients, is having a positive impact on STI risk behaviours or condom use. A few projects have reported increases in STI caseloads following integration. In some projects, FP providers were trained in STI case management, but few clients were subsequently treated. PMID:10859857
Managing mapping data using commercial data base management software.
Elassal, A.A.
1985-01-01
Electronic computers are involved in almost every aspect of the map making process. This involvement has become so thorough that it is practically impossible to find a recently developed process or device in the mapping field which does not employ digital processing in some form or another. This trend, which has been evolving over two decades, is accelerated by the significant improvements in capility, reliability, and cost-effectiveness of electronic devices. Computerized mapping processes and devices share a common need for machine readable data. Integrating groups of these components into automated mapping systems requires careful planning for data flow amongst them. Exploring the utility of commercial data base management software to assist in this task is the subject of this paper. -Author
Environmental management strategy: four forces analysis.
Doyle, Martin W; Von Windheim, Jesko
2015-01-01
We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.
Information management system study results. Volume 1: IMS study results
NASA Technical Reports Server (NTRS)
1971-01-01
The information management system (IMS) special emphasis task was performed as an adjunct to the modular space station study, with the objective of providing extended depth of analysis and design in selected key areas of the information management system. Specific objectives included: (1) in-depth studies of IMS requirements and design approaches; (2) design and fabricate breadboard hardware for demonstration and verification of design concepts; (3) provide a technological base to identify potential design problems and influence long range planning (4) develop hardware and techniques to permit long duration, low cost, manned space operations; (5) support SR&T areas where techniques or equipment are considered inadequate; and (6) permit an overall understanding of the IMS as an integrated component of the space station.
Environmental Management Strategy: Four Forces Analysis
NASA Astrophysics Data System (ADS)
Doyle, Martin W.; Von Windheim, Jesko
2015-01-01
We develop an analytical approach for more systematically analyzing environmental management problems in order to develop strategic plans. This approach can be deployed by agencies, non-profit organizations, corporations, or other organizations and institutions tasked with improving environmental quality. The analysis relies on assessing the underlying natural processes followed by articulation of the relevant societal forces causing environmental change: (1) science and technology, (2) governance, (3) markets and the economy, and (4) public behavior. The four forces analysis is then used to strategize which types of actions might be most effective at influencing environmental quality. Such strategy has been under-used and under-valued in environmental management outside of the corporate sector, and we suggest that this four forces analysis is a useful analytic to begin developing such strategy.
Business process study simulation for resource management in an emergency department.
Poomkothammal, Velusamy
2006-01-01
Alexandra Hospital conducted a business process reengineering exercise for all its main processes in order to further improve on their efficiencies with the ultimate aim to provide a higher level of services to patients. The goal of the DEM is to manage an anticipated increase in the volume of patients without much increase in resources. As a start, the Department of Emergency (DEM) medicine studied its AS-IS process and has designed and implemented the new TO-BE process. As part of this continuous improvement effort, staff from Nanyang Polytechnic (NYP) has been assigned the task of applying engineering and analytical techniques to simulate the new process. The simulations were conducted to show on process management and resource planning.
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
Guide to DCP Study Close-Out: Milestones and Tasks | Division of Cancer Prevention
This guide assists Consortium Lead Organization (CLO) planning for DCP study close-out. Study close-out tasks are organized under milestones, which help mark progress toward completion of the close-out process. Once tasks associated with a milestone are underway, planning for the next milestone may begin. Click on a milestone to view the associated close-out tasks. |
ERIC Educational Resources Information Center
Javad Ahmadian, Mohammad; Tavakoli, Mansoor; Vahid Dastjerdi, Hossein
2015-01-01
This study investigates the combined effects of task-based careful online planning and the storyline structure of a task on second language performance (complexity, accuracy and fluency). Sixty intermediate EFL learners were randomly assigned to four groups (n = 15). Participants were asked to perform two tasks with different degrees of storyline…
Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach
NASA Technical Reports Server (NTRS)
Jacobs, Derya, A.; Aasen, Curtis A.
2000-01-01
Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.
Chowdhry, Vivek; Padhi, Manoranjan; Mohanty, B B; Biswal, Suvakanta
2016-01-01
Perioperative management of deaf and dumb patients can be a challenging task. For smooth postoperative recovery, proper care should begin in the preoperative period. Understanding the patients' needs and training him to follow the instructions requires to involve a communication specialist. Judicious use of sedatives and analgesics is essential to keep the patient pain-free and comfortable. Postoperatively, the patient should be kept awake, enough to understand the internal need of the body and to make a meaningful response to external stimuli. Adequate preoperative planning and coordinated team efforts with involvement of specialists can help in delivering better postoperative care.
Management Information Task Group
2002-12-18
Defense Business Practice Implementation Board Management Information Task Group Report...Std Z39-18 Defense Business Practice Implementation Board Management Information Task Group... Business Practice Implementation Board Management Information Task Group Report FY02-2 3
New Zealand Freshwater Management: Changing Policy for a Changing World
NASA Astrophysics Data System (ADS)
Rouse, H. L.; Norton, N.
2014-12-01
Fresh water is essential to New Zealand's economic, environmental, cultural and social well-being. In line with global trends, New Zealand's freshwater resources are under pressure from increased abstraction and changes in land-use which contribute contaminants to our freshwater systems. Recent central government policy reform introduces greater national direction and guidance, to bring about a step-change in freshwater management. An existing national policy for freshwater management introduced in 2011 requires regional authorities to produce freshwater management plans containing clear freshwater objectives (measurable statements about the desired environmental state for water bodies) and associated limits to resource use (such as environmental flows and quantity allocation limits, and loads of contaminants to be discharged). These plans must integrate water quantity and quality management, consider climate change, and incorporate tangata whenua (New Zealand māori) roles and interests. In recent (2014) national policy amendments, the regional authorities are also required to implement national 'bottom-line' standards for certain attributes of the system to be managed; undertake accounting for all water takes and all sources of contaminants; and to develop and implement their plans in a collaborative way with communities. This rapid change in national policy has necessitated a new way of working for authorities tasked with implementation; many obstacles lie in their path. The scientific methods required to help set water quantity limits are well established, but water quality methods are less so. Collaborative processes have well documented benefits but also raise many challenges, particularly for the communication of complex and often uncertain scientific information. This paper provides background on the national policy changes and offers some early lessons learned by the regional authorities implementing collaborative freshwater management in New Zealand.
NASA Technical Reports Server (NTRS)
Rash, James L. (Editor); Dent, Carolyn P. (Editor)
1989-01-01
Theoretical and implementation aspects of AI systems for space applications are discussed in reviews and reports. Sections are devoted to planning and scheduling, fault isolation and diagnosis, data management, modeling and simulation, and development tools and methods. Particular attention is given to a situated reasoning architecture for space repair and replace tasks, parallel plan execution with self-processing networks, the electrical diagnostics expert system for Spacelab life-sciences experiments, diagnostic tolerance for missing sensor data, the integration of perception and reasoning in fast neural modules, a connectionist model for dynamic control, and applications of fuzzy sets to the development of rule-based expert systems.
Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode
Scheib, Jean P. P.; Stoll, Sarah; Thürmer, J. Lukas; Randerath, Jennifer
2018-01-01
The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively. PMID:29593612
Tasks completed by nursing members of a teaching hospital Medical Emergency Team.
Topple, Michelle; Ryan, Brooke; Baldwin, Ian; McKay, Richard; Blythe, Damien; Rogan, John; Radford, Sam; Jones, Daryl
2016-02-01
To assess tasks completed by intensive care medical emergency team nurses. Prospective observational study. Australian teaching hospital. Nursing-related technical and non-technical tasks and level of self-reported confidence and competence. Amongst 400 calls, triggers and nursing tasks were captured in 93.5% and 77.3% of cases, respectively. The median patient age was 73 years. The four most common triggers were hypotension (22.0%), tachycardia (21.1%), low SpO2 (17.4%), and altered conscious state (10.1%). Non-technical skills included investigation review (33.7%), history acquisition (18.4%), contribution to the management plan (40.5%) and explanation to bedside nurses (78.3%), doctors (13.6%), allied health (3.9%) or patient/relative (39.5%). Technical tasks included examining the circulation (32%), conscious state (29.4%), and chest (26.5%). Additional tasks included adjusting oxygen (23.9%), humidification (8.4%), non-invasive ventilation (6.5%), performing an ECG (22%), and administrating fluid as a bolus (17.5%) or maintenance (16, 5.2%), or medication as a statim dose (16.8%) or infusion (5.2%). Self-reported competence and confidence appeared to be high overall amongst our MET nurses. Our findings provide important information on the tasks completed by Medical Emergency Team nurses and will guide future training. Copyright © 2015 Elsevier Ltd. All rights reserved.
Effects of Pretask Modeling on Attention to Form and Question Development
ERIC Educational Resources Information Center
Kim, YouJin
2013-01-01
Over the last two decades, a growing body of research has shown positive impacts for task planning in task-based instruction (e.g., Ellis, 2005; Foster & Skehan, 1996). However, what learners plan during pretask planning, and whether any specific planning strategies are more beneficial in encouraging learners to attend to linguistic forms and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abston, J.P.
1997-04-01
The Lockheed Martin Energy Systems, Inc. (Energy Systems) policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at the Gunite and Associated Tanks (GAAT) in the North and South Tank Farms (NTF and STF) at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to health and safety (H and S) issues. The policy and procedures in this plan apply to all GAAT operations in the NTF and STF. The provisions of this plan are to bemore » carried out whenever activities identifies s part of the GAAT are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices in order to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to the air. This plan explains additional task-specific health and safety requirements such as the Site Safety and health Addendum and Activity Hazard Analysis, which should be used in concert with this plan and existing established procedures.« less
Huskamp, Haiden A; Riedel, Lauren E; Barry, Colleen L; Busch, Alisa B
2018-06-01
Efficacious medications to treat opioid use disorders (OUDs) have been slow to diffuse into practice, and insurance coverage limits may be one important barrier. To compare coverage for medications used to treat OUDs and opioids commonly prescribed for pain management in plans offered on the 2017 Health Insurance Marketplace exchanges. We identified a sample of 100 plans offered in urban and in rural counties on the 2017 Marketplaces, weighting by population. We accessed publicly available plan coverage information on healthcare.gov for states with a federally facilitated exchange, the state exchange website for state-based exchanges, and insurer websites. About 14% of plans do not cover any formulations of buprenorphine/naloxone. Plans were more likely to require prior authorization for any of the covered office-based buprenorphine or naltrexone formulations preferred for maintenance OUD treatment (ie, buprenorphine/naloxone, buprenorphine implants, injectable long-acting naltrexone) than of short-acting opioid pain medications (63.6% vs. 19.4%; P<0.0001). Only 10.6% of plans cover implantable buprenorphine, 26.1% cover injectable naltrexone, and 73.4% cover at least 1 abuse-deterrent opioid pain medication. Many Marketplace plans either do not cover or require prior authorization for coverage of OUD medications, and these restrictions are often more common for OUD medications than for short-acting opioid pain medications. Regulators tasked with enforcement of the Mental Health Parity and Addiction Equity Act, which requires that standards for formulary design for mental health and substance use disorder drugs be comparable to those for other medications, should focus attention on formulary coverage of OUD medications.
Hardie, Rae-Anne; Baysari, Melissa T; Lake, Rebecca; Richardson, Lauren; McCullagh, Cheryl; Westbrook, Johanna I
2017-01-01
The roll-out of a hospital-wide electronic medication management system (eMMS) is a challenging task, requiring planning, coordination, communication and change management. This research aimed to explore the views of doctors and nurses about the strategy used to implement an eMM system in a paediatric hospital. Semi-structured interviews were performed during the first week of the implementation on each ward, and were then followed up three and six weeks post implementation. In total, 90 users (60 nurses and 30 doctors) were asked about their impressions of the implementation, as well as their perceptions of training and IT support. Qualitative thematic analysis was performed by three researchers. Most users perceived the implementation of the eMM to be positive overall. Although perceptions of the implementation process remained largely consistent across the six weeks, users identified several areas where improvements were needed, especially early in implementation, including resources, planning, roll-out strategy and training. These findings are useful for future implementations of eMM systems in paediatric hospitals.
Sharma, Ravi; Manikandhan, R; Sneha, P; Parameswaran, Anantanarayanan; Kumar, J Naveen; Sailer, Hermann F
2017-01-01
Management of temporomandibular joint (TMJ) ankylosis is a challenging and rather daunting task owing to complex abnormal anatomy and its sequel to craniofacial structures. Various autogenous grafts and alloplastic materials have been tried with variable success for creation of a near-normal joint. In recent years, neocondyle distraction has added a new dimension to the management of TMJ ankylosis. The aim of this paper is to describe the role of neocondyle distraction in TMJ ankylosis. Neocondyle distraction was carried out in five patients with TMJ ankylosis following gap arthroplasty. Computed tomogram scans were taken before surgery and 1-year postdistraction for surgical planning and postoperative assessment, respectively. The intraoral distractors (KLS Martin, Jacksonville, FL, USA) were used in this study. All five patients reported with adequate mouth opening and functional jaw movements. The procedure was well tolerated by all the patients. None of the patients underwent reankylosis following neocondyle distraction. With proper surgical planning and distraction protocol, neocondyle distraction is an effective and safe technique for TMJ reconstruction and preventing reankylosis.
Task sharing within a managed clinical network to improve child health in Malawi.
O'Hare, Bernadette; Phiri, Ajib; Lang, Hans-Joerg; Friesen, Hanny; Kennedy, Neil; Kawaza, Kondwani; Jana, Collins E; Chirambo, George; Mulwafu, Wakisa; Heikens, Geert T; Mipando, Mwapatsa
2015-07-21
Eighty per cent of Malawi's 8 million children live in rural areas, and there is an extensive tiered health system infrastructure from village health clinics to district hospitals which refers patients to one of the four central hospitals. The clinics and district hospitals are staffed by nurses, non-physician clinicians and recently qualified doctors. There are 16 paediatric specialists working in two of the four central hospitals which serve the urban population as well as accepting referrals from district hospitals. In order to provide expert paediatric care as close to home as possible, we describe our plan to task share within a managed clinical network and our hypothesis that this will improve paediatric care and child health. Managed clinical networks have been found to improve equity of care in rural districts and to ensure that the correct care is provided as close to home as possible. A network for paediatric care in Malawi with mentoring of non-physician clinicians based in a district hospital by paediatricians based at the central hospitals will establish and sustain clinical referral pathways in both directions. Ultimately, the plan envisages four managed paediatric clinical networks, each radiating from one of Malawi's four central hospitals and covering the entire country. This model of task sharing within four hub-and-spoke networks may facilitate wider dissemination of scarce expertise and improve child healthcare in Malawi close to the child's home. Funding has been secured to train sufficient personnel to staff all central and district hospitals in Malawi with teams of paediatric specialists in the central hospitals and specialist non-physician clinicians in each government district hospital. The hypothesis will be tested using a natural experiment model. Data routinely collected by the Ministry of Health will be corroborated at the district. This will include case fatality rates for common childhood illness, perinatal mortality and process indicators. Data from different districts will be compared at baseline and annually until 2020 as the specialists of both cadres take up posts. If a managed clinical network improves child healthcare in Malawi, it may be a potential model for the other countries in sub-Saharan Africa with similar cadres in their healthcare system and face similar challenges in terms of scarcity of specialists.
RDT&E Progress and Plansfor Hexavalent Chromium (Cr6+)
2011-05-12
RDT&E Progress and Plans for Hexavalent Chromium (Cr6+) Bruce Sartwell Weapons Systems and Platforms Program Manager E2S2 Conference May 12, 2011...2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE RDT&E Progress and Plansfor Hexavalent Chromium (Cr6+) 5a...Tasks/Projects Surface treatments and soluble inhibitors: 1. Fundamental studies of the Trivalent Chrome Process (TCP) 2. Mechanisms of selected
2014-05-01
a cost- effective approach for achieving audit readiness. To help minimize the inefficient use of resources when previously identified deficiencies...System (GFEBS) emphasizing the implementation of effective business processes. However, the Army did not fully complete certain tasks in accordance...represent material portions of future SBRs and, if not auditable, will likely affect the Army’s ability to achieve audit readiness goals as planned
The future of hazardous chemical safety in China: Opportunities, problems, challenges and tasks.
Wang, Bing; Wu, Chao; Reniers, Genserik; Huang, Lang; Kang, Liangguo; Zhang, Laobing
2018-06-20
China is a major country producing and using hazardous chemicals. Unfortunately, the hazardous chemical industry is still one of the most high-risk industries in China. In recent years, especially after two devastating hazardous chemical accidents, namely "Qingdao 11.2 Crude Oil Leaking and Explosion Accident" and "Tianjin Port 8.12 Fire and Explosion Accident" which occurred in 2013 and 2015 respectively, China has attached great importance to hazardous chemical safety. The period between 2016 and 2017 is a crucial period for the future direction of hazardous chemical safety in China because China released a series of important government documents (such as 'Thirteenth Five-Year (2016-2020) Plan for Hazardous Chemical Safety' and 'Comprehensive Plan for Hazardous Chemical Safety Management (December 2016-November 2019)') to promote hazardous chemical safety in the future. What is the future development of China's hazardous chemical safety? To answer this question, this paper attempts to briefly analyze and introduce the opportunities, problems, challenges and tasks of the future of safety with hazardous chemical industrial activities in China, according to the current situation of hazardous chemical safety in China and using the latest government documents and studies. Obviously, this study can provide useful evidence and suggestions for the future of safety management in the hazardous chemical industry both within China and in other countries. Copyright © 2018 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chu, C.I.C.; Gillespie, B.L.
One of the most perplexing problems facing the coal industry is how to properly dispose of the waste and/or even recovery a small fraction of the Btu value of the waste, while minimizing the environmental concerns. UCC Research considers this monumental environmental problems as an opportunity to recovery useable organic materials and reduce the environmental problems created by coal waste. Mild gasification is the method used by UCC Research to realize these objectives. Coal feedstocks are fed into the mild gasification system yielding liquids, char, and gases for commercial application. The program consists of seven tasks: Task 1, Characterize Managementmore » of Coal Preparation Wastes; Task 2, Review Design Specifications and Prepare Preliminary Test Plan; Task 3, Select and Characterize Test Feedstocks; Task 4, Acquire/Construct Process Elements; Task 5, Prepare Final Test Plan; Task 6, Implement Final Test Plan; Task 7, Analyze Test Results and Assess System Economics. A schedule of the program is given. The program was initiated on September 30, 1984. Tasks 1, 2, 3, 4, 5, and 6 have been completed. Work is continuing on Task 7.« less
Advanced automation for in-space vehicle processing
NASA Technical Reports Server (NTRS)
Sklar, Michael; Wegerif, D.
1990-01-01
The primary objective of this 3-year planned study is to assure that the fully evolved Space Station Freedom (SSF) can support automated processing of exploratory mission vehicles. Current study assessments show that required extravehicular activity (EVA) and to some extent intravehicular activity (IVA) manpower requirements for required processing tasks far exceeds the available manpower. Furthermore, many processing tasks are either hazardous operations or they exceed EVA capability. Thus, automation is essential for SSF transportation node functionality. Here, advanced automation represents the replacement of human performed tasks beyond the planned baseline automated tasks. Both physical tasks such as manipulation, assembly and actuation, and cognitive tasks such as visual inspection, monitoring and diagnosis, and task planning are considered. During this first year of activity both the Phobos/Gateway Mars Expedition and Lunar Evolution missions proposed by the Office of Exploration have been evaluated. A methodology for choosing optimal tasks to be automated has been developed. Processing tasks for both missions have been ranked on the basis of automation potential. The underlying concept in evaluating and describing processing tasks has been the use of a common set of 'Primitive' task descriptions. Primitive or standard tasks have been developed both for manual or crew processing and automated machine processing.
Developing an incident management system to support Ebola response -- Liberia, July-August 2014.
Pillai, Satish K; Nyenswah, Tolbert; Rouse, Edward; Arwady, M Allison; Forrester, Joseph D; Hunter, Jennifer C; Matanock, Almea; Ayscue, Patrick; Monroe, Benjamin; Schafer, Ilana J; Poblano, Luis; Neatherlin, John; Montgomery, Joel M; De Cock, Kevin M
2014-10-17
The ongoing Ebola virus disease (Ebola) outbreak in West Africa is the largest and most sustained Ebola epidemic recorded, with 6,574 cases. Among the five affected countries of West Africa (Liberia, Sierra Leone, Guinea, Nigeria, and Senegal), Liberia has had the highest number cases (3,458). This epidemic has severely strained the public health and health care infrastructure of Liberia, has resulted in restrictions in civil liberties, and has disrupted international travel. As part of the initial response, the Liberian Ministry of Health and Social Welfare (MOHSW) developed a national task force and technical expert committee to oversee the management of the Ebola-related activities. During the third week of July 2014, CDC deployed a team of epidemiologists, data management specialists, emergency management specialists, and health communicators to assist MOHSW in its response to the growing Ebola epidemic. One aspect of CDC's response was to work with MOHSW in instituting incident management system (IMS) principles to enhance the organization of the response. This report describes MOHSW's Ebola response structure as of mid-July, the plans made during the initial assessment of the response structure, the implementation of interventions aimed at improving the system, and plans for further development of the response structure for the Ebola epidemic in Liberia.
Bhui, Kamaldeep; Dinos, Sokratis; Galant-Miecznikowska, Magdalena; de Jongh, Bertine; Stansfeld, Stephen
2016-01-01
Aims and method To identify causes of stress at work as well as individual, organisational and personal interventions used by employees to manage stress in public, private and non-governmental organizations (NGOs). Qualitative interviews were conducted with 51 employees from a range of organisations. Results Participants reported adverse working conditions and management practices as common causes of work stress. Stress-inducing management practices included unrealistic demands, lack of support, unfair treatment, low decision latitude, lack of appreciation, effort–reward imbalance, conflicting roles, lack of transparency and poor communication. Organisational interventions were perceived as effective if they improved management styles, and included physical exercise, taking breaks and ensuring adequate time for planning work tasks. Personal interventions used outside of work were important to prevent and remedy stress. Clinical implications Interventions should improve management practices as well as promoting personal interventions outside of the work setting. PMID:28377811
Managing the Earth’s Biggest Mass Gathering Event and WASH Conditions: Maha Kumbh Mela (India)
Baranwal, Annu; Anand, Ankit; Singh, Ravikant; Deka, Mridul; Paul, Abhishek; Borgohain, Sunny; Roy, Nobhojit
2015-01-01
Background: Mass gatherings including a large number of people makes the planning and management of the event a difficult task. Kumbh Mela is one such, internationally famous religious mass gathering. It creates the substantial challenge of creating a temporary city in which millions of people can stay for a defined period of time. The arrangements need to allow this very large number of people to reside with proper human waste disposal, medical services, adequate supplies of food and clean water, transportation etc. Methods: We report a case study of Maha Kumbh, 2013 which focuses on the management and planning that went into the preparation of Kumbh Mela and understanding its water, sanitation and hygiene conditions. It was an observational cross-sectional study, the field work was done for 13 days, from 21 January to 2 February 2013. Results: Our findings suggest that the Mela committee and all other agencies involved in Mela management proved to be successful in supervising the event and making it convenient, efficient and safe. Health care services and water sanitation and hygiene conditions were found to be satisfactory. BhuleBhatke Kendra (Center for helping people who got separated from their families) had the major task of finding missing people and helping them to meet their families. Some of the shortfalls identified were that drainage was a major problem and some fire incidents were reported. Therefore, improvement in drainage facilities and reduction in fire incidents are essential to making Mela cleaner and safer. The number of persons per toilet was high and there were no separate toilets for males and females. Special facilities and separate toilets for men and women will improve their stay in Mela. Conclusion: Inculcation of modern methods and technologies are likely to help in supporting crowd management and improving water, sanitation and hygiene conditions in the continuously expanding KumbhMela, in the coming years. PMID:25932345
Managing the Earth's Biggest Mass Gathering Event and WASH Conditions: Maha Kumbh Mela (India).
Baranwal, Annu; Anand, Ankit; Singh, Ravikant; Deka, Mridul; Paul, Abhishek; Borgohain, Sunny; Roy, Nobhojit
2015-04-13
Mass gatherings including a large number of people makes the planning and management of the event a difficult task. Kumbh Mela is one such, internationally famous religious mass gathering. It creates the substantial challenge of creating a temporary city in which millions of people can stay for a defined period of time. The arrangements need to allow this very large number of people to reside with proper human waste disposal, medical services, adequate supplies of food and clean water, transportation etc. We report a case study of Maha Kumbh, 2013 which focuses on the management and planning that went into the preparation of Kumbh Mela and understanding its water, sanitation and hygiene conditions. It was an observational cross-sectional study, the field work was done for 13 days, from 21 January to 2 February 2013. Our findings suggest that the Mela committee and all other agencies involved in Mela management proved to be successful in supervising the event and making it convenient, efficient and safe. Health care services and water sanitation and hygiene conditions were found to be satisfactory. BhuleBhatke Kendra (Center for helping people who got separated from their families) had the major task of finding missing people and helping them to meet their families. Some of the shortfalls identified were that drainage was a major problem and some fire incidents were reported. Therefore, improvement in drainage facilities and reduction in fire incidents are essential to making Mela cleaner and safer. The number of persons per toilet was high and there were no separate toilets for males and females. Special facilities and separate toilets for men and women will improve their stay in Mela. Inculcation of modern methods and technologies are likely to help in supporting crowd management and improving water, sanitation and hygiene conditions in the continuously expanding KumbhMela, in the coming years.
Fetterolf, Donald E
2003-01-01
Many physicians find hospital or health plan boards of directors to be intimidating arenas for medical quality presentations. This essay presents a number of "pearls" gleaned from successful senior clinician managers who have learned to relate to senior management and advance in their careers. This commentary was developed from research and a presentation of the same title delivered at the American College of Medical Quality Annual Meeting held in Las Vegas in October, 2001. It is important that medical directors who work with financial managers convert quality concepts into "business value" concepts. Talking in the language of business, rather than the language of doctors, makes it much easier to communicate with management (although some translation is often in order). As a clinician presenting to financial managers, you should become familiar with financial terms and how they are used. Indeed, the development of a financial model representing clinical activity results in the highest level of success. There are a number of methods for estimating impact that have been found within general business and health services research areas that are acceptable. Successful presenters of information approach their task effectively. Reports are in a more readable format and convey information for action by the corporation rather than as a scholarly treatise. Approaching senior management, one must consider the psychology of individuals in senior positions. Senior medical executives who are successful report similar approaches to their tasks, and offer helpful insight into career advancement.
Refueling Strategies for a Team of Cooperating AUVs
2011-01-01
manager, and thus the constraint a centrally managed underwater network imposes on the mission. Task management utilizing Robust Decentralized Task ...the computational complexity. A bid based approach to task management has also been studied as a possible means of decentralization of group task ...currently performing another task . In [18], ground robots perform distributed task allocation using the ASyMTRy-D algorithm, which is based on CNP
Advanced systems engineering and network planning support
NASA Technical Reports Server (NTRS)
Walters, David H.; Barrett, Larry K.; Boyd, Ronald; Bazaj, Suresh; Mitchell, Lionel; Brosi, Fred
1990-01-01
The objective of this task was to take a fresh look at the NASA Space Network Control (SNC) element for the Advanced Tracking and Data Relay Satellite System (ATDRSS) such that it can be made more efficient and responsive to the user by introducing new concepts and technologies appropriate for the 1997 timeframe. In particular, it was desired to investigate the technologies and concepts employed in similar systems that may be applicable to the SNC. The recommendations resulting from this study include resource partitioning, on-line access to subsets of the SN schedule, fluid scheduling, increased use of demand access on the MA service, automating Inter-System Control functions using monitor by exception, increase automation for distributed data management and distributed work management, viewing SN operational control in terms of the OSI Management framework, and the introduction of automated interface management.
Siems, Ashley; Cartron, Alexander; Watson, Anne; McCarter, Robert; Levin, Amanda
2017-02-01
Rapid response teams (RRTs) improve the detection of and response to deteriorating patients. Professional hierarchies and the multidisciplinary nature of RRTs hinder team performance. This study assessed whether an intervention involving crew resource management training of team leaders could improve team performance. In situ observations of RRT activations were performed pre- and post-training intervention. Team performance and dynamics were measured by observed adherence to an ideal task list and by the Team Emergency Assessment Measure tool, respectively. Multiple quartile (median) and logistic regression models were developed to evaluate change in performance scores or completion of specific tasks. Team leader and team introductions (40% to 90%, P = .004; 7% to 45%, P = .03), floor team presentations in Situation Background Assessment Recommendation format (20% to 65%, P = .01), and confirmation of the plan (7% to 70%, P = .002) improved after training in patients transferred to the ICU (n = 35). The Team Emergency Assessment Measure metric was improved in all 4 categories: leadership (2.5 to 3.5, P < .001), teamwork (2.7 to 3.7, P < .001), task management (2.9 to 3.8, P < .001), and global scores (6.0 to 9.0, P < .001) for teams caring for patients who required transfer to the ICU. Targeted crew resource management training of the team leader resulted in improved team performance and dynamics for patients requiring transfer to the ICU. The intervention demonstrated that training the team leader improved behavior in RRT members who were not trained. Copyright © 2017 by the American Academy of Pediatrics.
System design of the Pioneer Venus spacecraft. Volume 14: Test planning trades
NASA Technical Reports Server (NTRS)
Pedretti, C. D.
1973-01-01
Pioneer Venus system test plans and trade studies which were first published as Study Tasks (References 1 through 5) are reviewed. The plan and trade studies are presented in a condensed form. Greater detail may be found in the referenced study tasks if desired. All significant conclusions and plan outlines of the original studies are, presented.
Typical and Atypical (Cerebral Palsy) Development of Unimanual and Bimanual Grasp Planning
ERIC Educational Resources Information Center
Janssen, Loes; Steenbergen, Bert
2011-01-01
In the present study we tested 13 children with cerebral palsy (CP) and 24 typically developing children (7-12 years old) in a unimanual and bimanual motor planning task. We focused on two research questions: (1) How does motor planning develop in children with and without CP? and (2) Is motor planning facilitated when the task is performed with…
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Support to LANL: Cost estimation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less
Working memory and organizational skills problems in ADHD.
Kofler, Michael J; Sarver, Dustin E; Harmon, Sherelle L; Moltisanti, Allison; Aduen, Paula A; Soto, Elia F; Ferretti, Nicole
2018-01-01
This study tested model-driven predictions regarding working memory's role in the organizational problems associated with ADHD. Children aged 8-13 (M = 10.33, SD = 1.42) with and without ADHD (N = 103; 39 girls; 73% Caucasian/Non-Hispanic) were assessed on multiple, counterbalanced working memory tasks. Parents and teachers completed norm-referenced measures of organizational problems (Children's Organizational Skills Scale; COSS). Results confirmed large magnitude working memory deficits (d = 1.24) and organizational problems in ADHD (d = 0.85). Bias-corrected, bootstrapped conditional effects models linked impaired working memory with greater parent- and teacher-reported inattention, hyperactivity/impulsivity, and organizational problems. Working memory predicted organization problems across all parent and teacher COSS subscales (R 2 = .19-.23). Approximately 38%-57% of working memory's effect on organization problems was conveyed by working memory's association with inattentive behavior. Unique effects of working memory remained significant for both parent- and teacher-reported task planning, as well as for teacher-reported memory/materials management and overall organization problems. Attention problems uniquely predicted worse organizational skills. Hyperactivity was unrelated to parent-reported organizational skills, but predicted better teacher-reported task planning. Children with ADHD exhibit multisetting, broad-based organizational impairment. These impaired organizational skills are attributable in part to performance deficits secondary to working memory dysfunction, both directly and indirectly via working memory's role in regulating attention. Impaired working memory in ADHD renders it extraordinarily difficult for these children to consistently anticipate, plan, enact, and maintain goal-directed actions. © 2017 Association for Child and Adolescent Mental Health.
Using GOMS and Bayesian plan recognition to develop recognition models of operator behavior
NASA Astrophysics Data System (ADS)
Zaientz, Jack D.; DeKoven, Elyon; Piegdon, Nicholas; Wood, Scott D.; Huber, Marcus J.
2006-05-01
Trends in combat technology research point to an increasing role for uninhabited vehicles in modern warfare tactics. To support increased span of control over these vehicles human responsibilities need to be transformed from tedious, error-prone and cognition intensive operations into tasks that are more supervisory and manageable, even under intensely stressful conditions. The goal is to move away from only supporting human command of low-level system functions to intention-level human-system dialogue about the operator's tasks and situation. A critical element of this process is developing the means to identify when human operators need automated assistance and to identify what assistance they need. Toward this goal, we are developing an unmanned vehicle operator task recognition system that combines work in human behavior modeling and Bayesian plan recognition. Traditionally, human behavior models have been considered generative, meaning they describe all possible valid behaviors. Basing behavior recognition on models designed for behavior generation can offers advantages in improved model fidelity and reuse. It is not clear, however, how to reconcile the structural differences between behavior recognition and behavior modeling approaches. Our current work demonstrates that by pairing a cognitive psychology derived human behavior modeling approach, GOMS, with a Bayesian plan recognition engine, ASPRN, we can translate a behavior generation model into a recognition model. We will discuss the implications for using human performance models in this manner as well as suggest how this kind of modeling may be used to support the real-time control of multiple, uninhabited battlefield vehicles and other semi-autonomous systems.
Interactive multi-objective path planning through a palette-based user interface
NASA Astrophysics Data System (ADS)
Shaikh, Meher T.; Goodrich, Michael A.; Yi, Daqing; Hoehne, Joseph
2016-05-01
n a problem where a human uses supervisory control to manage robot path-planning, there are times when human does the path planning, and if satisfied commits those paths to be executed by the robot, and the robot executes that plan. In planning a path, the robot often uses an optimization algorithm that maximizes or minimizes an objective. When a human is assigned the task of path planning for robot, the human may care about multiple objectives. This work proposes a graphical user interface (GUI) designed for interactive robot path-planning when an operator may prefer one objective over others or care about how multiple objectives are traded off. The GUI represents multiple objectives using the metaphor of an artist's palette. A distinct color is used to represent each objective, and tradeoffs among objectives are balanced in a manner that an artist mixes colors to get the desired shade of color. Thus, human intent is analogous to the artist's shade of color. We call the GUI an "Adverb Palette" where the word "Adverb" represents a specific type of objective for the path, such as the adverbs "quickly" and "safely" in the commands: "travel the path quickly", "make the journey safely". The novel interactive interface provides the user an opportunity to evaluate various alternatives (that tradeoff between different objectives) by allowing her to visualize the instantaneous outcomes that result from her actions on the interface. In addition to assisting analysis of various solutions given by an optimization algorithm, the palette has additional feature of allowing the user to define and visualize her own paths, by means of waypoints (guiding locations) thereby spanning variety for planning. The goal of the Adverb Palette is thus to provide a way for the user and robot to find an acceptable solution even though they use very different representations of the problem. Subjective evaluations suggest that even non-experts in robotics can carry out the planning tasks with a great deal of flexibility using the adverb palette.
Khan, Aliya A; Morrison, Archie; Kendler, David L; Rizzoli, Rene; Hanley, David A; Felsenberg, Dieter; McCauley, Laurie K; O'Ryan, Felice; Reid, Ian R; Ruggiero, Salvatore L; Taguchi, Akira; Tetradis, Sotirios; Watts, Nelson B; Brandi, Maria Luisa; Peters, Edmund; Guise, Teresa; Eastell, Richard; Cheung, Angela M; Morin, Suzanne N; Masri, Basel; Cooper, Cyrus; Morgan, Sarah L; Obermayer-Pietsch, Barbara; Langdahl, Bente L; Dabagh, Rana Al; Davison, K Shawn; Sándor, George K; Josse, Robert G; Bhandari, Mohit; El Rabbany, Mohamed; Pierroz, Dominique D; Sulimani, Riad; Saunders, Deborah P; Brown, Jacques P; Compston, Juliet
Osteonecrosis of the jaw (ONJ) has been associated with antiresorptive therapy in both oncology and osteoporosis patients. This debilitating condition is very rare and advances in diagnosis and management may now effectively reduce the risk of its development and offer valuable treatment options for affected patients. This paper provides a case-based review of ONJ and application of the International Task Force on ONJ (referred to as the "Task Force") recommendations for the diagnosis and management of ONJ. The Task Force was supported by 14 international societies and achieved consensus from representatives of these multidisciplinary societies on key issues pertaining to the diagnosis and management of ONJ. The frequency of ONJ in oncology patients receiving oncology doses of bisphosphonate (BP) or denosumab is estimated at 1%-15%, and the frequency in the osteoporosis patient population receiving much lower doses of BP or denosumab is estimated at 0.001%-0.01%. Although the diagnosis of ONJ is primarily clinical, imaging may be helpful in confirming the diagnosis and staging. In those with multiple risk factors for ONJ for whom major invasive oral surgery is being planned, interruption of BP or denosumab therapy (in cancer patients) is advised, if possible, before surgery, until the surgical site heals. Major oral surgery in this context could include multiple extractions if surgical extractions are required, not simple forceps extractions. ONJ development may be reduced by optimizing oral hygiene and postoperatively using topical and systemic antibiotics as appropriate. Periodontal disease should be managed before starting oncology doses of BP or denosumab. Local debridement may be successful in disease unresponsive to conservative therapy. Successful surgical intervention has been reported in those with stage 3 disease; less severe disease is best managed conservatively. Teriparatide may be helpful in healing ONJ lesions and may be considered in osteoporosis patients at a high fracture risk in the absence of contraindications. Resumption of BP or denosumab therapy following healing of ONJ lesions is recommended, and there have not been reports of subsequent local recurrence. Copyright © 2017. Published by Elsevier Inc.
NEEMO 18-20: Analog Testing for Mitigation of Communication Latency During Human Space Exploration
NASA Technical Reports Server (NTRS)
Chappell, Steven P.; Beaton, Kara H.; Miller, Matthew J.; Graff, Trevor G.; Abercromby, Andrew F. J.; Gernhardt, Michael L.; Halcon, Christopher
2016-01-01
NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of communication latencies on operations concepts, timelines, and tasks were studied. METHODS: Twelve subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science team (ST) to provide input and direction during exploration activities. Exploration traverses were preplanned based on precursor data. Subjects completed science-related tasks including pre-sampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were designed to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, ST assimilation time (defined as time available for ST to discuss data/imagery after data acquisition). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for pre-sampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across communication latencies and can be done with minimal crew idle time. Imagery and contextual information from the EVA crew that is transmitted real-time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide meaningful feedback and instruction to the crew regarding sampling priorities, additional tasks, and changes to the EVA timeline. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency.
The weight of Thai infants exclusively breast-fed and formula-fed from birth to four months.
Chavalittamrong, B; Jirapinyo, P
1987-05-01
The 18-month Industry-Based Family Planning Project, which involved 30 industrial establishments located in Metro Manila (Philippines), combined a heavy interpersonal component, through a network of trained in-plant volunteers (IPVs), with an intensive in-plant information campaign. The latter made use of seminars, audiovisual presentations, posters, brochures, leaflets, photo exhibits, and contests. Training of the project staff -- 5 project officers and a project coordinator -- included providing them with the knowledge, attitudes, and skills necessary to carry out their tasks. Tasks were: to transfer to the IPVs knowledge of the concept of responsible parenthood and the various family planning methods, skills in motivating other workers, and responding to rumors and misconceptions about family planning methods; to act as resource persons on responsible parenthood and family planning methods in the industry setting; and to provide the technical support to the IPVs on responsible parenthood. The campaign plan centered on strategies which would help achieve the project objective, i.e., to increase the demand for and the availability of family planning information and services using nongovernment and government organizations. Basically, the plan addressed 2 segments of the industrial sector: the workers as the primary audience and the company managers as the secondary target. According to the program's pro-choice policy, a wide range of approved family planning services were made available to interested employees either by accredited company clinics or outside family planning service centers. Services by outside family planning service clinics were delivered via referrals or, in some instances, at the company's "doorstep." The end-of-project evaluation and the analysis of data gathered from reports and records maintained by the companies and by the Population Center Foundation (PCF) indicate that, after 18 months of operation, the project was able to substantially achieve its objective. It increased the demand for family planning information and services among workers in 30 industrial establishments located in Metro Manila. The more frequently mentioned sources of information on responsible parenthood and family planning were project-related personnel. Additionally, the different family planning methods became more widely known in the companies.