Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
TWRS Configuration management program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
Management of technical date in Nihon Doro kodan
NASA Astrophysics Data System (ADS)
Hanada, Jun'ichi
Nihon Doro Kodan Laboratory has collected and contributed technical data (microfiches, aerial photographs, books and literature) on plans, designs, constructions and maintenance of the national expressways and the ordinary toll roads since 1968. This work is systematized on computer to retrieve and contribute data faster. Now Laboratory operates Technical Data Management System which manages all of technical data and Technical Document Management System which manages technical documents. These systems stand on users' on-line retrieval and data accumuration by microfiches and optical disks.
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
Forest Resource Management Plans: A Sustainability Approach
ERIC Educational Resources Information Center
Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.
2012-01-01
Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…
The Method of Multiple Spatial Planning Basic Map
NASA Astrophysics Data System (ADS)
Zhang, C.; Fang, C.
2018-04-01
The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
Succession Planning for Management Staff at a Western Canadian Postsecondary Technical Institute.
ERIC Educational Resources Information Center
Cembrowski, Barbara Joan; da Costa, Jose L.
This study used naturalistic inquiry to gain an understanding of how managerial personnel perceived career development and succession planning at a postsecondary technical institute in Canada. A total of nine individuals in three different career development stages completed semistructured interviews. It was found that managers perceived the…
Succession Planning for Management Staff at a Canadian Post Secondary Technical Institute.
ERIC Educational Resources Information Center
da Costa, Jose; Cembrowski, Barbara
2001-01-01
Analyzed interviews to explore how nine administrators, at three different career stages, perceived career-development and succession planning at a Canadian postsecondary technical institute. Managers attribute career success to possession of varied personal attributes, diverse work experiences, serendipity, and a fulfilling work environment. Job…
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan
NASA Technical Reports Server (NTRS)
1974-01-01
The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
Academic Unit Planning and Management. Technical Report No. 75.
ERIC Educational Resources Information Center
Miyataki, Glenn K.; Byers, Maureen L.
Intended to provide a systematic aid for planning and managing academic units (schools, colleges, departments, or divisions) within an institution, the Academic Unit Planning and Management (AUPM) manual consists of a multifaceted set of techniques and procedures that can be used by academic unit administrators. Data regarding academic unit…
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
7 CFR 610.32 - Technical assistance furnished.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE CONSERVATION OPERATIONS TECHNICAL ASSISTANCE Conservation of Private Grazing Land... managers to plan and implement resource conservation on grazing land. The objective of planning on grazing...
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
1991-02-01
to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as
Science-based strategic planning for hazardous fuel treatment.
D.L. Peterson; M.C. Johnson
2007-01-01
A scientific foundation coupled with technical support is needed to develop long-term strategic plans for fuel and vegetation treatments on public lands. These plans are developed at several spatial scales and are typically a component of fire management plans and other types of resource management plans. Such plans need to be compatible with national, regional, and...
Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans
The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.
77 FR 77121 - Hispanic Council on Federal Employment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-31
.... Reviewing leading practices in strategic human resources management planning; b. Providing advice on ways to... technical expertise regarding strategic human resources management planning and the merit systems principles... OFFICE OF PERSONNEL MANAGEMENT Hispanic Council on Federal Employment AGENCY: Office of Personnel...
Advanced Air Traffic Management System Study - Technical Summary
DOT National Transportation Integrated Search
1975-03-01
This report summarizes the U.S. Department of Transportation study and development plans for the air traffic management system of the late 1980's and beyond. The plans are presented in the framework of an evolutionary system concept of traffic manage...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
33 CFR 385.21 - Quality control.
Code of Federal Regulations, 2014 CFR
2014-07-01
... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project Management Plan and shall describe the procedures to be used to ensure compliance with technical and policy requirements during implementation. (b) During development of the Project Management Plan for each project, the...
Report of the Tape Recorder Action Plan Committee, 21 March 1972
NASA Technical Reports Server (NTRS)
1972-01-01
A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.
Engineering Technical Review Planning Briefing
NASA Technical Reports Server (NTRS)
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
10 CFR 905.40 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...
13 CFR 124.107 - What is potential for success?
Code of Federal Regulations, 2010 CFR
2010-01-01
... eligibility is based have substantial business management experience; (ii) The applicant has demonstrated technical experience to carry out its business plan with a substantial likelihood for success if admitted to... will also consider the technical and managerial experience of the applicant concern's managers, the...
Annual Report of the Metals and Ceramics Information Center, 1 May 1979-30 April 1980.
1980-07-01
MANAGEMENT AND ECONOMIC ANALYSIS DEPT. * Computer and Information SyslemsiD. C Operations 1 Battelle Technical Inputs to Planning * Computer Systems 0...Biomass Resources * Education 0 Business Planning * Information Systems * Economics , Planning and Policy Analysis * Statistical and Mathematical Modelrng...Metals and Ceramics Information Center (MCIC) is one of several technical information analysis centers (IAC’s) chartered and sponsored by the
Management and Planning for Small Community Wastewater
Operators Small Systems Management and Planning for Small Community Wastewater The NESC has provided information below. If you have a technical question we can help. Call us toll free at (304) 293-4191. or e of Clean Water Agencies (NACWA) Achieving Environmental Excellence: An Environmental Management
2008-09-01
ITP . Assessment Indicators: • Has the risk management team (RMT) provided a risk management plan (RMP)? − Does the RMP provide an organized...processes. Diskettes, which contain the necessary programs for accessing BMP◊NET from IBM -compatible or Macintosh computers with a modem, and answers to
15 CFR 295.6 - Criteria for selection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... innovation, the technical approach, major technical hurdles, the attendant risks, and clearly establish... project and project's organizational structure and management plan, including the extent to which...
75 FR 4122 - Data Collection Available for Public Comments and Recommendations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-26
... disadvantaged businesses with management and technical assistance to enhance their ability to compete in the..., and management and technical assistance through 7(j) designated funds) to foster the business growth... questions to legal land insurance, business planning, financing, marketing and business operations) that...
NASA Technical Reports Server (NTRS)
Pryor, H. E.
1975-01-01
Current problems and future trends in information management are briefly summarized in relation to scientific and technical information management systems and management of management information (planning, marketing, and operations).
44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Provision of technical... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance... technical assistance to the licensee. Such assistance may be provided during the pendency of an appeal under...
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burgard, K.G.
This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less
A National Periodicals Center Technical Development Plan.
ERIC Educational Resources Information Center
Council on Library Resources, Inc., Washington, DC.
This technical plan for developing, managing, and operating a national periodicals center (NPC), which was prepared at the request of the Library of Congress, is designed so that it could be used by the Library or any other agency prepared to assume responsibility for the creation of a major periodicals facility. The overall goal of the NPC is to…
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
A consumer guide: tools to manage vegetation and fuels.
David L. Peterson; Louisa Evers; Rebecca A. Gravenmier; Ellen Eberhardt
2007-01-01
Current efforts to improve the scientific basis for fire management on public lands will benefit from more efficient transfer of technical information and tools that support planning, implementation, and effectiveness of vegetation and hazardous fuel treatments. The technical scope, complexity, and relevant spatial scale of analytical and decision support tools differ...
ERIC Educational Resources Information Center
Crump, Kelvin
This paper presents a case study of the process of capital investment strategic planning at the Gold Coast Institute of Technical and Further Education (TAFE), Queensland, Australia. Capital investment strategic planning is a means of contributing to success by providing strategies to ensure that assets are managed efficiently, effectively, and…
Guidelines for Local Governments on Solid Waste Management.
ERIC Educational Resources Information Center
National Association of Counties, Washington, DC. Research Foundation.
This document consists of ten guides on Solid Waste Management to assist local elected and appointed policy-making officials. They are entitled: Areawide Approaches; Legal Authority, Planning, Organization Design and Operation, Financing, Technical and Financial Assistance, Citizen Support, Personnel, and Action Plan and Bibliography. The guides…
Strategic Mobility 21 Project Management Plan
2006-09-29
California Association of Governments (SCAG), and other stakeholders to transform the former military installation into a modern in-land distribution node... governments , including adversary governments , and may be exported. c. This statement may not be used on technical documents that formerly were...required updates of both the ICD and the Technical Plan. SM21 has established a consortium of public and private, governmental and non
ERIC Educational Resources Information Center
Wedderburn, Dorothy
Forty case studies made by research teams of independents or governmental agencies in Austria, Canada, France, Germany, Norway, Sweden, United Kingdom, and the United States were analyzed to provide managements and trade unions with illustrations of present systems of technical and manpower changes at the enterprise level and to describe the…
NASA Astrophysics Data System (ADS)
Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.
2017-08-01
In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.
ERIC Educational Resources Information Center
Himes, Dottie
This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…
33 CFR 385.5 - Guidance memoranda.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sources of water will occur as a result of implementation of the Plan (§ 385.36(b)). (b) Special processes..., implementation, and management of one specific individual feature of the Plan, this section does not require... § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
1994-07-18
09 Software Product Training 3 .4 .11 Physical Cues Segment Development3 .01 Technical Management .02 SW Requirements Analysis .03 Preliminary Design...Mission Planning Subsystem Development3 .01 Technical Management .02 SW Requirements Analysis .03 Preliminary Design - .04 Detailed Design .05 Code & CSU
Impact of Automation on Technical Services.
ERIC Educational Resources Information Center
Rooks, Dana C.; Thompson, Linda L.
1988-01-01
Discusses the impact of automation on library technical services, and the need for library managers to be aware of the issues involved and to plan for future developments. The discussion focuses on the areas of job related concerns of technical staff, organizational structures, recruitment and training, and ergonomic considerations. (CLB)
ERIC Educational Resources Information Center
Nowrasteh, Daryush M.
This publication is designed to serve state-level planners interested in reviewing the key concepts of state planning and management systems. The compact nature of the review and its organization in guideline format should provide a ready reference for the practitioner seeking to develop and improve management systems for vocational education in…
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase 1 Technical Report
1990-04-05
MANAGEMENT INFORMATION , COMMUNICATIONS, AND COMPUTER SCIENCES Visual Knowledge in Tactical Planning: Preliminary Knowledge Acquisition Phase I Technical...perceived provides information in multiple modalities and, in fact, we may rely on a non-verbal mode for much of our understanding of the situation...some tasks, almost all the pertinent information is provided via diagrams, maps, znd other illustrations. Visual Knowledge Visual experience forms a
DOT National Transportation Integrated Search
1997-02-01
This technical memorandum was developed as part of the study, Systems Planning for Automated Commercial Vehicle Licensing and Permitting Systems. The objective of this study was to define the requirements and develop a plan for a national progr...
ERIC Educational Resources Information Center
Salazar, LeRoy; And Others
This resource for trainers involved in irrigated agriculture training for Peace Corps volunteers consists of two parts: irrigation training manual and irrigation reference manual. The complete course should fully prepare volunteers serving as irrigation, specialists to plan, implement, evaluate and manage small-scale irrigation projects in arid,…
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
The Development of a Planning, Programming and Budgeting System. Technical Report.
ERIC Educational Resources Information Center
Appelquist, Claes-Goran; Zandren, S.
In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…
Modular space station phase B extension program master plan
NASA Technical Reports Server (NTRS)
Munsey, E. H.
1971-01-01
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
DOT National Transportation Integrated Search
2016-08-01
The Participant Training and Stakeholder Education Plan is a high-level plan for the recruitment and training of all automobile drivers, pedestrians, transit drivers, traffic management center (TMC) operators, and installation and maintenance technic...
1989-08-01
Include in this plan the role of the Defense Technical Information Center (DTIC), the Defense Technology Security Administration ( DTSA ), and ODDR&E’s...DTIC = Defense Technical Information Center DTSA = Defense Technology Security Administration DUSD = Deputy Under Secretary of Defense Gloss. 2 DUSD...technologically sensitive requests. The Defense Technology Security Administi ation ( DTSA ) is developing a large system to track foreign military sales
Using computer software to improve group decision-making.
Mockler, R J; Dologite, D G
1991-08-01
This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.
A Hierarchy of Management Training Requirements: The Competency Domain Model.
ERIC Educational Resources Information Center
Sandwith, Paul
1993-01-01
The Competency Domain Model has five domains of management competencies: conceptual/creative, leadership, interpersonal, administrative, and technical. Specific competencies and training plans can be identified in each domain for different levels--first line supervisor, field office manager, assistant manager, area manager, director of operations.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
Managing the TDM process : developing MPO institutional capacity - technical report.
DOT National Transportation Integrated Search
2015-04-01
Within Texas, the development of urban travel demand models (TDMs) is a cooperative process between the : Texas Department of Transportation and Metropolitan Planning Organizations (MPOs). Though TxDOT-Transportation Planning and Programming Division...
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
DOT National Transportation Integrated Search
2006-02-06
for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed as a result of extensive and methodical pre-planning. This approach, however, does not adequately s...
ERIC Educational Resources Information Center
Valle, Victor M.
The success of development programs in educational systems is dependent, to a large extent, on the quality and relevancy of their management. Many worthwhile, well conceived and planned educational reforms have failed due to poor management. Therefore, both ministries of education and international organizations of technical cooperation have…
ERIC Educational Resources Information Center
Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.
This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…
25 CFR 1200.1 - Purpose of this regulation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... processes by which Indian tribes can manage tribal funds currently held in trust by the United States. It... they may request technical assistance or grants to help prepare plans to manage funds or to ensure the capability to manage those funds. ...
25 CFR 1200.1 - Purpose of this regulation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... processes by which Indian tribes can manage tribal funds currently held in trust by the United States. It... they may request technical assistance or grants to help prepare plans to manage funds or to ensure the capability to manage those funds. ...
25 CFR 1200.1 - Purpose of this regulation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... processes by which Indian tribes can manage tribal funds currently held in trust by the United States. It... they may request technical assistance or grants to help prepare plans to manage funds or to ensure the capability to manage those funds. ...
25 CFR 1200.1 - Purpose of this regulation.
Code of Federal Regulations, 2014 CFR
2014-04-01
... processes by which Indian tribes can manage tribal funds currently held in trust by the United States. It... they may request technical assistance or grants to help prepare plans to manage funds or to ensure the capability to manage those funds. ...
25 CFR 1200.1 - Purpose of this regulation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... processes by which Indian tribes can manage tribal funds currently held in trust by the United States. It... they may request technical assistance or grants to help prepare plans to manage funds or to ensure the capability to manage those funds. ...
Technical Overview of Ecological Risk Assessment: Problem Formulation
Before the ecological risk assessment is conducted, risk assessors and risk managers engage in a planning dialogue to ensure that the risk assessment will enable the risk managers to make informed environmental decisions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This technical note describes the current capabilities and availability of the Automated Dredging and Disposal Alternatives Management System (ADDAMS). The technical note replaces the earlier Technical Note EEDP-06-12, which should be discarded. Planning, design, and management of dredging and dredged material disposal projects often require complex or tedious calculations or involve complex decision-making criteria. In addition, the evaluations often must be done for several disposal alternatives or disposal sites. ADDAMS is a personal computer (PC)-based system developed to assist in making such evaluations in a timely manner. ADDAMS contains a collection of computer programs (applications) designed to assist in managingmore » dredging projects. This technical note describes the system, currently available applications, mechanisms for acquiring and running the system, and provisions for revision and expansion.« less
NASA Astrophysics Data System (ADS)
Weintraub, C.; Christian-Smith, J.; Dobbin, K.; Cullen, K.
2017-12-01
This presentation will share content from UCS's new publication, Getting Involved in Groundwater; A Guide to Effective Engagement in California's Groundwater Sustainability Plans, as well as lessons learned from collaborating with community organizations to provide technical assistance to Groundwater Sustainability Agency (GSA) board members and stakeholders in the San Joaquin Valley on Groundwater Sustainability Plan (GSP) development. California's Sustainable Groundwater Management Act (SGMA) mandates extensive stakeholder engagement, presenting an opportunity for unincorporated, low-income communities that have historically been affected by but not included in water decisions. However, implementation requires a concerted, thoughtful effort. Through technical assistance and strategic outreach, the Union of Concerned Scientists (UCS) is working to ensure stakeholder engagement in GSP development is robust, diverse, and supported by the best science available. UCS created the GSP stakeholder engagement guide to equip GSA members, scientists and interested community members to meaningfully engage in the GSP development process. The guide serves as a technical primer on SGMA's GSP process and as a resource for understanding groundwater management in California. The guide is just one component of a larger effort to overcome barriers to effective engagement in sustainable groundwater management, especially those presented by technical information. In April, UCS co-hosted a technical assistance workshop for GSA and advisory committee members in Visalia, CA with the Community Water Center (CWC), a local environmental justice non-profit. The workshop was well received and UCS and the CWC were invited to host a second workshop in June. To deepen this engagement and provide one-on-one technical assistance, UCS developed a program to match relevant water experts in the UCS Science Network with GSA members or involved community members in need of specific technical support. Through these efforts, UCS is working to break down barriers to participation and ensure sound science is incorporated into the GSP process.
7 CFR 4280.42 - Application evaluation and selection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Project plans, its management, and, if applicable, its products and operating plans. (The business plan...) Nature of the Project. Rural Development will award up to 60 points based on whether the Project: (i) Is... connection project (such as streets or utilities)—20 points; (ii) Provides Technical Assistance to rural...
Using Research To Inform Business and Strategic Decisions.
ERIC Educational Resources Information Center
Young, Graeme
This paper examines and reviews research techniques used to support business and strategic planning at a large metropolitan technical and further education (TAFE) college. Section 1 is an outline of the structure of Chisholm Institute's planning and research processes. It discusses the management structure, strategic plan, and departments within…
Tsofa, Benjamin; Molyneux, Sassy; Gilson, Lucy; Goodman, Catherine
2017-09-15
A common challenge for health sector planning and budgeting has been the misalignment between policies, technical planning and budgetary allocation; and inadequate community involvement in priority setting. Health system decentralisation has often been promoted to address health sector planning and budgeting challenges through promoting community participation, accountability, and technical efficiency in resource management. In 2010, Kenya passed a new constitution that introduced 47 semi-autonomous devolved county governments, and a substantial transfer of responsibility for healthcare from the central government to these counties. This study analysed the effects of this major political decentralization on health sector planning, budgeting and overall financial management at county level. We used a qualitative, case study design focusing on Kilifi County, and were guided by a conceptual framework which drew on decentralisation and policy analysis theories. Qualitative data were collected through document reviews, key informant interviews, and participant and non-participant observations conducted over an eighteen months' period. We found that the implementation of devolution created an opportunity for local level prioritisation and community involvement in health sector planning and budgeting hence increasing opportunities for equity in local level resource allocation. However, this opportunity was not harnessed due to accelerated transfer of functions to counties before county level capacity had been established to undertake the decentralised functions. We also observed some indication of re-centralisation of financial management from health facility to county level. We conclude by arguing that, to enhance the benefits of decentralised health systems, resource allocation, priority setting and financial management functions between central and decentralised units are guided by considerations around decision space, organisational structure and capacity, and accountability. In acknowledging the political nature of decentralisation polices, we recommend that health sector policy actors develop a broad understanding of the countries' political context when designing and implementing technical strategies for health sector decentralisation.
Bill Williams; Tracey S. Frescino; Larry T. DeBlander; Sharon W. Woudenberg; Michael Wilson
2006-01-01
The Bureau of Land Management (BLM) does not have a consistent internal program or source of vegetation data to use for strategic level planning, such as in resource management plans. This technical note discusses and evaluates the potential of the USDA Forest Service Forest Inventory and Analysis (FIA) Program to assist the BLM in filling this data gap. The FIA...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental, LLC
2009-09-01
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less
7 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Environmental Protection Agency (EPA) will— (1) Approve 208 water quality management plans, (2) Participate in... enter into contracts to install and maintain best management practices to control agricultural nonpoint... Secretary may designate, (3) Provide technical assistance and share the cost of carrying out best management...
Code of Federal Regulations, 2010 CFR
2010-01-01
... a contract, and which is operated by the producer with equipment, labor, management, and production... management facility means a structural conservation practice, implemented in the context of a Comprehensive Nutrient Management Plan and consistent with the Field Office Technical Guide, which is used for storing...
ERIC Educational Resources Information Center
National Aeronautics and Space Administration, Washington, DC. Scientific and Technical Information Branch.
This information resources management (IRM) bibliography provides abstracts of reports and journal articles entered in the National Aeronautics and Space Administration (NASA) scientific and technical information system over a 6-year period. These abstracts are presented in 10 areas: (1) IRM activities and planning; (2) computers,…
Overviews of the Apollo Program and Its Management
NASA Technical Reports Server (NTRS)
2004-01-01
This special bibliography includes items individually selected by scientific and technical information professionals that provide an overview of the history, events, and results of the Apollo missions. Planning, scheduling, and management are also included.
Opti-Tool: EPA Region 1's Stormwater Management Optimization Tool
Opti-Tool assists stormwater managers & consulting engineers in preparing technically sound & cost-effective watershed SW mgmt plans to achieve needed pollutant & volume reductions more affordably from developed landscapes throughout the New England Region
Joseph E. de Steiguer; Leslie Liberti; Albert Schuler; Bruce Hansen
2003-01-01
Foresters and natural resource managers must balance conflicting objectives when developing land-management plans. Conflicts may encompass economic, environmental, social, cultural, technical, and aesthetic objectives. Selecting the best combination of management uses from numerous objectives is difficult and challenging. Multi-Criteria Decision Models (MCDM) provide a...
How to manage without being a manager
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sweeney, M.A.
1997-06-01
In the author`s current position at Sandia National Laboratories within the Pulsed Power Sciences Center, much of the author`s time is spent in composing short (one page) technical reports and long (> 20 page) technical contracts and program plans for transmission to the Department of Energy and to upper management and also in reviewing long technical documents for accuracy. A major requirement of these efforts is to complete them on a timely basis, often within a few hours or a few days. In this talk, the author reveals some communication {open_quotes}secrets{close_quotes} that have been learned. The idea behind these twelvemore » {open_quotes}secrets{close_quotes} is to get the answers you, as a nonmanager, need quickly from a manager without creating stress either on your part or the manager`s part.« less
Research and Technology Operating Plan Summary: Fiscal Year 1973 Research and Technology Program
NASA Technical Reports Server (NTRS)
1972-01-01
Abstracts are presented of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA. This RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The summary is arranged in five sections consisting of citations and abstracts of the RTOPs and subject, technical monitor, responsible NASA organization, and RTOP number indexes.
McDonald, G; Weston, N; Dorrington, B
2003-01-01
This paper reports on work in progress on the new Wet Tropics Regional Natural Resource Management Plan and its potential to deliver river management and water quality outcomes. The plan is being prepared in accordance with the guidelines of the Nation Action Plan for Salinity and Water Quality/Natural Heritage Trust (NAP/NHT2). In particular the paper discusses the technical basis for priorities, target setting and implementation and the most effective instruments for achieving river improvement and water quality outcomes in the region.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-20
... of 20 hours of individual or group counseling sessions to small businesses per month. (D) Planning... training programs, such as, business assessment, management training, counseling, technical assistance... business counseling, and technical assistance with small businesses currently doing business with public...
of Expertise Customer service Technically savvy Event planning Word processing/desktop publishing Database management Research Interests Website design Database design Computational science Technology Consulting, Westminster, CO (2007-2012) Administrative Assistant, Source One Management, Denver, CO (2005
Succession Planning in a Two-Year Technical College System
ERIC Educational Resources Information Center
Neefe, Diane Osterhaus
2009-01-01
The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…
NASA software documentation standard software engineering program
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
1996-04-30
CJCS Chairman of the Joint Chiefs of Staff CMP Configuration Management Plan COTS Commercial-off-the-Shelf DA Data Administrator DASD (IM) Deputy...Staff ( CJCS ) representing the unified combatant commands. " Technical: The system can evolve (migrate) to be supported by the integrated, standards...s) (PSAs), or CJCS , having functional responsibility for the missions and functions supported by the system, with the participation of affected DoD
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
44 CFR 352.24 - Provision of technical assistance and Federal facilities and resources.
Code of Federal Regulations, 2011 CFR
2011-10-01
... assistance and Federal facilities and resources. 352.24 Section 352.24 Emergency Management and Assistance... PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal Participation § 352.24 Provision of technical assistance and Federal facilities and resources. (a) Under a determination under subpart A (44 CFR 352.5(f) and...
Efficiency in Resource Utilization in Education. Education and Development Technical Reports.
ERIC Educational Resources Information Center
Organisation for Economic Cooperation and Development, Paris (France). Directorate for Scientific Affairs.
This volume consists of papers presented at a meeting of scientific and technical personnel who examined and evaluated applications of systems analysis and operational research, and who related techniques to practical educational planning. Topics represent a variety of new management techniques available to educational administrators including…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... hours of individual or group counseling sessions to small businesses per month. (D) Planning Committee 1..., such as, business assessment, management training, counseling, technical assistance, marketing and... counseling, and technical assistance with small businesses currently doing business with public and private...
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1982-01-01
A compilation of summary portions of each of the Research and Technology Objectives and Plans (RTOPS) used for management review and control of research currently in progress throughout NASA is presented. Subject, technical monitors, responsible NASA organization, and RTOP number indexes are included.
ERIC Educational Resources Information Center
Osborn, John E.
2006-01-01
Colleges and universities face a wide range of environmental risk. In spite of this, with proper planning, they can avoid emergencies or surprises. Advanced planning, coupled with strategic, technical environmental and legal advice, enable higher-education institutions to keep their environmental budgets under control and predictable. This article…
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1981-01-01
A compilation of the summary portions of each of the Research and Technology Objective Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented. Indexes include: subject, technical monitor, responsible NASA organization, and RTOP number.
Research and Technology Objectives and Plans (RTOP), summary
NASA Technical Reports Server (NTRS)
1982-01-01
A compilation of summary portions of each of the Research and Technology Operating Plans (RTOPS) used for management review and control of research currently in progress throughout NASA is presented. Subject, technical monitor, responsible NASA organization, and RTOP number indexes are included.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1980-01-01
A compilation of the summary portions of each of the Research and Technology Objectives and Plans (RTOPS) used for management review and control research currently in progress throughout NASA is presented. Indexes include: subject, technical monitor, responsible NASA organization, and RTOP number.
On the design of computer-based models for integrated environmental science.
McIntosh, Brian S; Jeffrey, Paul; Lemon, Mark; Winder, Nick
2005-06-01
The current research agenda in environmental science is dominated by calls to integrate science and policy to better understand and manage links between social (human) and natural (nonhuman) processes. Freshwater resource management is one area where such calls can be heard. Designing computer-based models for integrated environmental science poses special challenges to the research community. At present it is not clear whether such tools, or their outputs, receive much practical policy or planning application. It is argued that this is a result of (1) a lack of appreciation within the research modeling community of the characteristics of different decision-making processes including policy, planning, and (2) participation, (3) a lack of appreciation of the characteristics of different decision-making contexts, (4) the technical difficulties in implementing the necessary support tool functionality, and (5) the socio-technical demands of designing tools to be of practical use. This article presents a critical synthesis of ideas from each of these areas and interprets them in terms of design requirements for computer-based models being developed to provide scientific information support for policy and planning. Illustrative examples are given from the field of freshwater resources management. Although computer-based diagramming and modeling tools can facilitate processes of dialogue, they lack adequate simulation capabilities. Component-based models and modeling frameworks provide such functionality and may be suited to supporting problematic or messy decision contexts. However, significant technical (implementation) and socio-technical (use) challenges need to be addressed before such ambition can be realized.
da Silva, Vania Eugênia; Mafra, Simone Caldas Tavares; Mafra, Cláudio Lísias; de Souza, Amaury Paulo
2012-01-01
This study looked for to lift information regarding laundries inserted in industries of animal products origin, to understand the activities developed in the section and to structure a Manual of Planning and Technical Information for laundries to industries of animal products origin, with the intention of subsidizing the planning, structuring and control of this work place, because norms or regulations that supervise don't exist or aid their managers and workers as for the operation of this work place.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1990-01-01
The NASA research and technology program for FY 1990 is presented. The summary portions is compiled of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The first section containing citations and abstracts of the RTOPs is followed by four indices: Subject; Technical Monitor; Responsible NASA Organization; and RTOP number.
33 CFR 385.5 - Guidance memoranda.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Water Management District shall, in consultation with the Department of the Interior, the Environmental... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General Provisions § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...
33 CFR 385.5 - Guidance memoranda.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Water Management District shall, in consultation with the Department of the Interior, the Environmental... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General Provisions § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...
33 CFR 385.5 - Guidance memoranda.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Water Management District shall, in consultation with the Department of the Interior, the Environmental... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN General Provisions § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...
Creating partnerships with local communities to manage and preserve corridors : technical report.
DOT National Transportation Integrated Search
2008-07-01
There is a serious need in Texas for better integration of land use and transportation planning, and better : coordination of land use and transportation decision making. Coordinated local-state partnerships in corridor : management and preservation ...
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
Social and economic profile technical guide
David Seesholtz; Denise Wickwar; John C. Russell
2006-01-01
A social and economic profile is a key element of a social assessment. A social and economic assessment or profile is used by line officers, planning staff social scientists, and others to inform both forest planning activities and project-level work. It is important to discover how planning and management decisions made by National Forest System staff will affect...
Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.
ERIC Educational Resources Information Center
Jacobs, Linda
This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…
NASA Astrophysics Data System (ADS)
D'Elia, I.; Bencardino, M.; Ciancarella, L.; Contaldi, M.; Vialetto, G.
2009-12-01
The Italian Air Quality legislation underwent sweeping changes with the implementation of the 1996 European Air Quality Framework Directive when the Italian administrative Regions were entrusted with air quality management tasks. The most recent Regional Air Quality Management Plans (AQMPs) highlighted the importance of Non-Technical Measures (NTMs), in addition to Technical Measures (TMs), in meeting environmental targets. The aim of the present work is to compile a list of all the TMs and NTMs taken into account in the Italian Regional AQMPs and to give in the target year, 2010, an estimation of SO 2, NO x and PM 10 emission reductions, of PM 10 concentration and of the health impact of PM 2.5 concentrations in terms of Life Expectancy Reduction. In order to do that, RAINS-Italy, as part of the National Integrated Modeling system for International Negotiation on atmospheric pollution (MINNI), has been applied. The management of TMs and NTMs inside RAINS have often obliged both the introduction of exogenous driving force scenarios and the control strategy modification. This has inspired a revision of the many NTM definitions and a clear choice of the definition adopted. It was finally highlighted that only few TMs and NTMs implemented in the AQMPs represent effective measures in reaching the environmental targets.
OSD CALS Architecture Master Plan Study. Concept Paper. Configuration Management. Volume 28
DOT National Transportation Integrated Search
1989-10-01
The mission of CALS is to enhance operational readiness of DoD weapon systems through application of information technology to the management of technical information. CALS will automate the current paper-intensive processes involved in weapon system...
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...
An Assessment of the College Market Spring-Summer 1980.
1983-05-01
access to jobs which lead to upper management in business or finance. Men are more likely than women to choose technical majors, plan on technical... feminism in society, the women in the sample strongly endorsed equality in jobs and rejected traditional female roles. They were ambivalent about the...appreciation of the difficulties women would face in selecting technical occupations, as well as business occupations. It is generally accepted, though it
Hazardous waste management at the local level; The Anchorage, Alaska experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wigglesworth, D.
1989-07-01
The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Li, Jun
This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less
Integrated watershed planning across jurisdictional boundaries
NASA Astrophysics Data System (ADS)
Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.
2014-12-01
We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.
Final recovery plan of the southwestern willow flycatcher (Empidonax traillii extimus)
Deborah M. Finch; Stephen I. Rothstein; Jon C. Boren; William L. Graf; Jerry L. Holechek; Barbara E. Kus; Robert M. Marshall; Molly M. Pohl; Susan J. Sferra; Mark K. Sogge; Julie C. Stromberg; Bradley A. Valentine; Mary J. Whitfield; Sartor O. Williams
2002-01-01
The Southwestern Willow Flycatcher Recovery Team is composed of a Technical Subgroup (pg. ii), six Implementation Subgroups (Appendix A), and a Tribal Working Group. The Technical Subgroup consists of 14 academic scientists, researchers, and resource managers with a wide range of expertise in avian biology and ecology, southwestern willow flycatcher ecology, cowbird...
A Visit to the Wasteland of Federal Scientific and Technical Information Policy.
ERIC Educational Resources Information Center
Aines, Andrew A.
1984-01-01
Outlines retreat from overall planning and management of federal scientific and technical information which began during the Nixon administration in early 1970s. Participation of the Office of Science and Technology and committees of Federal Council for Science and Technology and National Academy of Sciences-National Academy of Engineering is…
1992-04-15
World Military and Social Expenditures. 1991. 4. Republica de Colombia, Departamento Nacional de Planeacion , Documento DNP-2570-UIP-MinHacienda...Center, The Planning. Programmina and Budgeting System (PPBS), Technical Report, 1991. Departamento Nacional de Planeacion de Colombia, Plan ouinuenal
ERCMExpress. Volume 2, Issue 3
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
This issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress" promotes emergency exercises as an effective way to validate school safety plans. Simulations of emergency situations, or emergency exercises, are integral to a sound school safety plan. They offer opportunities for district and schools to…
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less
Data Management & Decision Making. Technical Report No. 14.
ERIC Educational Resources Information Center
Speedie, Stuart M.; Sanders, Susan
"Data Management and Decision Making" is a set of instructional materials designed to teach practicing and potential educational administrators about the uses of operations research in educational administration. It consists of five units--"Operations Research in Education,""PERT/CPM: A Planning and Analysis…
15 CFR 291.3 - Environmental tools and techniques projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... demonstrated access to relevant technical or information sources external to the organization. (3) Degree of.... Applicants should specify plans for proper organization, staffing, and management of the implementation... managing organization to conduct the proposed activities; qualifications of the project team and its...
Organization Development: Concept, Process, and Applications in the Department of Defense
1989-04-01
collection, the consultant performs an organizational diagnosis in which the focus is on identifying ways to improve the technical, administrative, and...dynamics, and organizational diagnosis . 2. Action/Planning Workshops. This activity consisted of management conferences and management/worker conferences
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saleh, Lydia Ilaiza, E-mail: lydiailaiza@gmail.com; Ryong, Kim Tae
The whole cycle of the decommissioning process development of repository requires the relevant bodies to have a financial system to ensure that it has sufficient funds for its whole life cycle (over periods of many decades). Therefore, the financing mechanism and management system shall respect the following status: the national position, institutional and legislative environment, technical capabilities, the waste origin, ownership, characteristics and inventories. The main objective of the studies is to focus on the cost considerations, alternative funding managements and mechanisms, technical and non-technical factors that may affect the repository life-cycle costs. As a conclusion, the outcomes of thismore » paper is to make a good recommendation and could be applied to the national planners, regulatory body, engineers, or the managers, to form a financial management plan for the decommissioning of the Nuclear Installation.« less
Enrollment Management Issue Analysis: Operating in a Post-Katrina Higher Education Environment
ERIC Educational Resources Information Center
Jones, Jacqueline; Das, Nabakrishna; Huggins, Desiree'; McNeely, Stanton, III
2008-01-01
A definition and brief history of enrollment management are presented. The challenges represented by Hurricane Katrina for enrollment management at one community technical college and a private 4-year college are identified along with three cases that illuminate the challenges. The need for rapid response planning is articulated. (Contains 1…
An ergonomic approach to improve work conditions of older employees in social housing.
Biquand, Sylvain; Heddad, Nadia
2012-01-01
French companies are legally required to develop action plans to improve employment and work conditions for older workers ("plans seniors"). These plans contain measures oriented towards recruiting, career evolution, skills developme1nt, knowledge transmission and improvement of work conditions. A tool for assessing work situations experienced by council buildings caretakers ("gardiens") was used in such a plan on behalf of the main agency of council housing in Paris, and we developed. This assessment tool was developed after ergonomic work analysis on a sample of 36 older caretakers (age > 57 y.o). The technical inspectors in charge of technical interventions on buildings and managing caretakers were trained to use the assessment tool and apply it to all caretakers aged 50 and over.
Benjamin Skolnik; David Wiedenfeld; Randy Dettmers; Constantino Aucca; Lina Daza; Heidy Valle; Francisco Sornoza; Javier Robayo; David Diaz; Jane Fitzgerald; Daniel Lebbin; Paul B. Hamel
2012-01-01
Vital to the work of the Cerulean Warbler Technical Group has been the collaboration among members to evaluate population status and coordinate planning for future activities, principally in conservation implementation. Two plans have been produced, one a general strategy for the conservation and management of the species over its entire range, and a more restricted...
National strategic plan: modeling and data systems for wildland fire and air quality.
David V. Sandberg; Colin C. Hardy; Roger D. Ottmar; J.A. Kendall Snell; Ann Acheson; Janice L. Peterson; Paula Seamon; Peter Lahm; Dale Wade
1999-01-01
This strategic plan is a technical discussion of the implementation and development of models and data systems used to manage the air quality impacts of wildland and prescribed fires. Strategies and priorities in the plan were generated by the Express Team (chartered by the National Wildfire Coordinating Group) and a diverse group of 86 subject matter experts who...
Naval Training Equipment Center Index of Technical Reports,
1982-09-01
741 RECOMMENDED PROCEDURES AND TRAINING NAVAL TRAINING AIDS. tAMPHIBIOUS OPERATIONS PROCEDURES AND RESEARCH PLANNING AD- 642 590 TRAINING DEVICES FOR...PROCEDURES AND RESEARCH PLANNING OBSERVATION AND FIRE CONTROL WITH FOR ANTI-AIR WARFARE TRAINING SPECIFIC REFERENCE TO THE TRAINING *AMPUTEES PROGRAM...619 AD- 707 757 NAVAL PERSONNEL *COMMUNICATION SATELLITES PROCEDURES AND RESEARCH PLANNING *COMBUSTION PRODUCTS Computer Managed Instruction by FOR
ERIC Educational Resources Information Center
Groff, Warren H.
North Central Technical College's (NCTC's) strategic planning and human resource development model is described in this paper in terms of its role in assisting the college's service area in adapting to new technologies. First, background information is presented on NCTC's planning process with respect to the strategic goal areas of: (1)…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... Development. Appendix A Recipient State Amount APD Urban Planning Management, FL $500,000 LLC. Capital Access... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5499-FA-01] Announcement of Funding...) 2011 AGENCY: Office of the Assistant Secretary for Community Planning and Development, HUD. ACTION...
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1979-01-01
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented along with citations and abstracts of the RTOPs. Indexes include: subject; technical monitor; responsible NASA organization; and RTOP number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1992-01-01
This publication represents the NASA research and technology program for FY92. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and technology objectives and plans: Summary fiscal year 1991
NASA Technical Reports Server (NTRS)
1991-01-01
This publication represents the NASA research and technology program for FY 1991. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and in universities. The first section contains citations and abstracts of the RTOP's and is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1993-01-01
This publication represents the NASA research and technology program for FY-93. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1988-01-01
This publication represents the NASA research and technology program for FY88. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1989-01-01
This publication represents the NASA research and technology program for FY89. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1985-01-01
This publication represents the NASA research and technology program for FY 1985. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1987-01-01
This publication represents the NASA research and technology program for FY87. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
75 FR 70966 - Transit Asset Management (TAM) Pilot Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... interoperability between diverse types of information technology systems through use of open data formats and... to develop asset management plans, technical assistance, data collection and a pilot program as... condition assessment methodologies, as well as new data collection and analysis activities. $3 million has...
Managing the Community College with an Entrepreneurial Spirit.
ERIC Educational Resources Information Center
Kotula, John R.; Decker, Henry J.
Drawing from experiences at Delaware Technical and Community College (DTCC), these papers discuss the institution's entrepreneurial approach to two aspects of college administration: developing relationships with business and industry, and management planning. Entrepreneurship is defined as the ability to find and evaluate opportunities, locate…
Software And Systems Engineering Risk Management
2010-04-01
RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software
ERIC Educational Resources Information Center
Hepburn, Larry; Shin, Masako
This document, one of eight in a multi-cultural competency-based vocational/technical curricula series, is on food service. This program is designed to run 24 weeks and cover 15 instructional areas: orientation, sanitation, management/planning, preparing food for cooking, preparing beverages, cooking eggs, cooking meat, cooking vegetables,…
The key to successful management of STS operations: An integrated production planning system
NASA Technical Reports Server (NTRS)
Johnson, W. A.; Thomasen, C. T.
1985-01-01
Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.
Becoming an effective clinical engineering or biomedical technology manager.
Brush, L C
1992-01-01
The BMET or CE Supervisor is a technical manager who is close to the actual work of a biomedical or clinical engineering department. The MPTI is a management training tool that has identified differences between the effective and less-effective technical managers. These behaviors or styles can be considered and applied to the clinical engineering and BMET work environments. Effective BMET or CE Supervisors have a management identity. They are both people-oriented and task-oriented. They are good problem-solvers, and will plan and structure the work tasks and environment. When the situation requires a change in plans, however, they can adapt to the new situation easily. If a decision needs to be made that affects the organization, they will check with higher management or peer managers. Less-effective BMET or CE Supervisors will make important decisions alone, without checking with others. They plan and structure tasks and the work environment, but they are less willing to change when faced with a new situation. They are not people-oriented, and their ability to assess social situations is low. Their need for achievement recognition is often too high. The work environment has an effect on how the competence of a manager is perceived. A "one-desk manager" in a small, one-person biomedical engineering department has more autonomy than a CE Supervisor in a large department. Working for a medical device manufacturing firm often requires a greater management identity. An engineering consultant is often a managing specialist, rather than a traditional manager.(ABSTRACT TRUNCATED AT 250 WORDS)
NASA Astrophysics Data System (ADS)
Mitroi, V.; de Coninck, A.; Vinçon-Leite, B.; Deroubaix, J.-F.
2014-09-01
The (re)construction of the ecological continuity is stated as one of the main objectives of the European Water Framework Directive for watershed management in Europe. Analysing the social, political, technical and scientific processes characterising the implementation of different projects of ecological continuity in two adjacent peri-urban territories in Ile-de-France, we observed science-driven approaches disregarding the social contexts. We show that, in urbanized areas, ecological continuity requires not only important technical and ecological expertise, but also social and political participation to the definition of a common vision and action plan. Being a challenge for both, technical water management institutions and "classical" ecological policies, we propose some social science contributions to deal with ecological unpredictability and reconsider stakeholder resistance to this kind of project.
75 FR 1839 - Departmental Offices; Debt Management Advisory Committee Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-13
... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of..., financing estimates and technical charts. This briefing will give the press an opportunity to ask questions...
Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Urban, Mary Elizabeth
Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less
2009-01-01
management. Forest and Natural Resources Management: USDA has provided technical guidance to assist MAIL in developing a pistachio forest management...plan for rehabilitating degraded pistachio woodlands. In 2006, target villages realized a 65 percent increase in income from pistachio nuts, with
ERIC Educational Resources Information Center
National Alliance of Business, Inc., Washington, DC.
This guide offers a practical approach for operating summer youth employment programs that involves cooperation among private businesses and local organizations. A timetable provides a month-by-month schedule. Seven sections discuss management responsibilities. Program Planning covers scope, goals, and coordination. Program Management addresses…
1993-01-01
and various DOD sites. I From 1984 to 1987, Mr. Pincock was a Certified Radiation and Chemistry Technician for United Nuclear Industries. He performed...in 1983, Mr. Pincock assisted the senior technical staff in radiation protection as a Junior Health Physics Technician at the Nuclear Support Services...SCOPE OF PROGRAM This plan contains a description of the personnel and procedures for managing the Remedial Investigation/Feasibility Study (RI/FS) at
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
Technical complications of implant-causes and management: A comprehensive review
Gupta, Swati; Gupta, Hemant; Tandan, Amrit
2015-01-01
Given the increasing popularity of dental implants, the number of failures due to late implant fracture is also expected to increase. Hence, the scope for prevention and management needs to be emphasized. The objective of this review article is to analyze the various causes of failure of dental implants due to implant fixture/abutment screw fractures and also to enumerate the management and the preventive options for these failures, thereby aiming to help the clinicians to properly plan the implant-supported prosthesis treatment by considering the important biomechanical aspects of this type of rehabilitation. The present review emphasizes the causes and management of technical complications and not the incidence of such complications. PMID:26668445
Planning for Worker Re-Adjustment: A Technical Assistance Guide for States.
ERIC Educational Resources Information Center
Balfe, Kevin
This guide summarizes key principles drawn from successful programs for helping unemployed workers find new jobs and presents a systematic approach to help states plan and manage their worker readjustment efforts. The guide contains two major sections. The first section is an overview and summary that includes background on the dislocation…
7 CFR 631.9 - Conservation plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management systems that will achieve the applicant's objectives and provide protection of soil, water, and... control agriculture-related pollution. (c) Technical assistance will be provided by NRCS, as needed by the...
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
Strategic Plan for Information Systems and Technology, Fiscal Years 1994-1998.
ERIC Educational Resources Information Center
National Archives and Records Administration, Washington, DC.
The information systems and technology management program of the National Archives and Records Administration (NARA) establishes broad policy guidance and technical standards for information management to ensure that appropriate resource sharing can occur, while providing cost-effective support for mission requirements of program offices. The NARA…
Designing the Regional College Management Information System.
ERIC Educational Resources Information Center
Kin Maung Kywe; And Others
Beginning in 1976, Regional Colleges were formed in Burma to implement career and technical education at the post-secondary level. This paper describes the Regional Colleges and explores the possible use of a systemic management information process that could assist in the complex planning required to develop second-year vocational and technical…
Space Geodesy Project Information and Configuration Management Procedure
NASA Technical Reports Server (NTRS)
Merkowitz, Stephen M.
2016-01-01
This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.
ERCMExpress. Volume 2, Issue 1
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
This issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress" focuses on integrating students with special needs and disabilities into emergency response and crisis management planning. Meeting the needs of students with disabilities and special needs in the event of an emergency does not have to be…
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
NASA Technical Reports Server (NTRS)
Grindle, Laurie; Hackenberg, Davis L.
2016-01-01
UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.
NASA Astrophysics Data System (ADS)
Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan
2016-07-01
The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.
NASA Technical Reports Server (NTRS)
Simon, Tom
2009-01-01
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
[Management of human resources, materials, and organization processes in radioprotection].
Coppola, V
1999-06-01
The radiologist must learn to face daily management responsibilities and therefore he/she needs the relevant knowledge. Aside from the mechanisms of management accounting, which differ only slightly from similar analysis methods used in other centers, the managing radiologist (the person in charge) is directly responsible for planning, organizing, coordinating and controlling radiation protection, a major discipline characterizing diagnostic imaging. We will provide some practical management hints, keeping in mind that radiation protection must not be considered a simple (or annoying) technical task, but rather an extraordinary positive element for the radiologist's cultural differentiation and professional identity. The managing radiologist can use the theory and practice of management techniques successfully applied in business, customizing them to the ethics and economics of health care. Meeting the users' needs must obviously prevail on balancing the budget from both a logical and an accounting viewpoints, since non-profit organizations are involved. In radiological practice, distinguishing the management of human from structural resources (direct funding is not presently available) permits to use internal benchmarking for the former and controlled acquisition and planned replacement of technologies in the latter, obviously after evaluation of specific indicators and according to the relevant laws and technical guidelines. Managing human resources means safeguarding the patient, the operator and the population, which can be achieved or improved using benchmarking in a diagnostic imaging department. The references for best practice will be set per tabulas based on the relevant laws and (inter)national guidelines. The physical-technical and bureaucratic-administrative factors involved will be considered as process indices to evaluate the gap from normal standards. Among the different elements involved in managing structural resources, the appropriate acquisition of a piece of radiological equipment is important from both a radiation protection and an economic viewpoints. In the acquisition process, the first and the last steps (technology assessment and planned replacement, respectively) are specifically important for the radiologist and play a major role in global management. In both cases the radiologist must be able to lay out autonomous and objective working projects, also using evaluation algorithms.
1993-12-01
Iaporta .. y be definitive for the tubjoct proaentod, exploratory in natura, or an evaluation of critical Aubayato• or of technical problema , 4...International Security 9 Social and Natural Science Studies Field 41 Edit: (Type 3) -Entry of an invalid code when Performance Type is "C" or "M" will...analysis SF Foreign area social science research SP Foreign area policy planAing research BF Identifies databases with data on foreign forces or
NPDES Permit Writers' Manual for Concentrated Animal Feeding Operations
This manual is designed to provide general information on the CWA and NPDES requirements for CAFOs, explain CAFO permitting, and provide technical information to understand options for nutrients management planning.
Entrepreneurship Education: A Shining Opportunity for Collaboration.
ERIC Educational Resources Information Center
Ely, Vivien King
1984-01-01
Characteristics of successful entrepreneurs are technical competence, business management skills, self-confidence, and intellectual honesty. Entrepreneurship education can be planned to coincide with the individual's life stages and readiness for entrepreneurship. (SK)
Enterprise Framework for the Disciplined Evolution of Legacy Systems
1997-10-01
out important global issues early in the planning cycle and provides insight for developing a synergistic set of management and technical practices to achieve a disciplined approach to system evolution.
Lisa J. Petit; Daniel R. Petit; Thomas E. Martin
1993-01-01
Habitat relationships of birds are well known compared to those of other taxa. However, a major obstacle to developing rigorous management plans for birds is the collation and transfer of information from widely scattered technical and academic publications to a form that can be applied directly to the management of species. Recognizing this dilemma, Hamel (1992)...
People Management. Final Report of the People Management Committee
1975-04-25
Objective Memorandum Planning, Programming, C Budgeting System Personnel Priority Model Projected Requisitioning Authority Prior ServIce Quality ...April 1975 PREPARED FOR - G THE DEPARTMENT OF ARMY OFFICE OF THE DEPUTY CHIEF OF STAFF FOR PERSONNEL NATIONAL TECHNICAL INFORMATION SERVICE US... service accessions and reenllstees. (3) Manage the DEP. (4) Bolster systems discipline. d. RecommendetIons; (1) That manpower objectives
Technical-economic modelling of integrated water management: wastewater reuse in a French island.
Xu, P; Valette, F; Brissaud, F; Fazio, A; Lazarova, V
2001-01-01
An integrated technical-economic model is used to address water management issues in the French island of Noirmoutier. The model simulates potable water production and supply, potable and non potable water demand and consumption, wastewater collection, treatment and disposal, water storage, transportation and reuse. A variety of water management scenarios is assessed through technical, economic and environmental evaluation. The scenarios include wastewater reclamation and reuse for agricultural and landscape irrigation as well as domestic non potable application, desalination of seawater and brackish groundwater for potable water supply. The study shows that, in Noirmoutier, wastewater reclamation and reuse for crop irrigation is the most cost-effective solution to the lack of water resources and the protection of sensitive environment. Some water management projects which are regarded as having less economic benefit in the short-term may become competitive in the future, as a result of tightened environmental policy, changed public attitudes and advanced water treatment technologies. The model provides an appropriate tool for water resources planning and management.
The Role of the Technical Specialist in Disaster Response and Recovery
NASA Astrophysics Data System (ADS)
Curtis, J. C.
2017-12-01
Technical Specialists provide scientific expertise for making operational decisions during natural hazards emergencies. Technical Specialists are important members of any Incident Management Team (IMT) as is described in in the National Incident Management System (NIMS) that has been designed to respond to emergencies. Safety for the responders and the threatened population is the foremost consideration in command decisions and objectives, and the Technical Specialist is on scene and in the command post to support and promote safety while aiding decisions for incident objectives. The Technical Specialist's expertise can also support plans, logistics, and even finance as well as operations. This presentation will provide actual examples of the value of on-scene Technical Specialists, using National Weather Service "Decision Support Meteorologists" and "Incident Meteorologists". These examples will demonstrate the critical role of scientists that are trained in advising and presenting life-critical analysis and forecasts during emergencies. A case will be made for local, state, and/or a national registry of trained and deployment-ready scientists that can support emergency response.
CALS Infrastructure Analysis. Draft. Volume 21
DOT National Transportation Integrated Search
1990-03-01
This executive overview to the DoD CALS Infrastructure Analysis Report summarizes the Components' current effort to modernize the DoD technical data infrastructure. This infrastructure includes all existing and planned capabilities to acquire, manage...
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1976-01-01
A compilation of the summary portion of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA is presented along with citations and abstracts of the RTOPs. Four indexes are included: (1) subject; (2) technical monitor; (3) responsible NASA organization; and (4) RTOP number.
Design and Implementation of Collaborative Research Approaches
NASA Technical Reports Server (NTRS)
Venti, Mike W.; Berger, David E.
2009-01-01
This poster reviews the collarborative research approaches that NASA has been designing and implementing for the Integrated Vehicle Health Management (IVHM) Project. The inputs for the technical plan are reviewed, the Research Test and Integration Plan (RTIP) WIKI, is used to create and propose a multi-themed and multi-partner research testing opportunities. The outputs are testing opportunities.
EPA Technical Support Centers (TSC): FY14 Lessons ...
EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this information to users in both direct applications (i.e., site-specific technical support) and general applications (i.e., technical transfer activities such as technical guidance documents, conferences, or workshops) . The TSCs are charged with providing solutions by: 1) linking EPA research to Agency decision-makers; 2) applying best practices to real world field applications; and 3) channeling feedback from field application to research communities. The TSP goal is to provide Regional Remedial Project Managers (RPMs), Corrective Action Staff, and On-Scene Coordinators (OSCs) with a diverse set of readily-accessible resources for technical assistance. This research summary provides six case studies – two from each of the three TSCs (Ground Water Technical Support Center, Engineering Technical Support Center, and Site Characterization Technical Support Center) – to exemplify and summarize the variety of TSC approaches that contribute to fulfilling the TSP mission. EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this informati
Promoting family planning through women's development.
Gulhati, K
1986-12-01
Private initiatives in developing countries have been successful in increasing women's desire for family planning by enabling them to earn more income. These approaches have incorporated a woman-to-woman strategy in which women train others not only in how to earn an income from producing and marketing products, but also in the skills needed to establish and manage their own organizations. Private voluntary organizations play an especially crucial role in training project managers. The Center for Development and Population Activities, for example, has held 19 Women in Management workshops and channels funds and technical assistance for projects in health, family planning, nutrition, and income generation. Women who move from managerial to policymaking positions are most able to help other women raise their political, social, and economic status.
Metals and Ceramics Information Center.
1981-07-01
Systems RESOURCE MANAGEMENT AND ECONOMIC ANALYSIS a Ordnance Technology a Space Systems and Applications a Biomass Resources 6 Business Planning • Economics ...r 19 KEY WORDS (Cwintince on reverse side 4 neressery and identify by block numnber) Technical Information Center Composites DoD Information Analysis ...The Metals and Ceramics Information Center (MCIC) is one of the technical Information Analysis Centers (IAC’s) chartered and sponsored by the
A Study of Placing Army Requirements on Contract
2016-04-01
perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011
Computer and Network Security in Small Libraries: A Guide for Planning.
ERIC Educational Resources Information Center
Williams, Robert L.
This manual is intended to provide a free resource on essential network security concepts for non-technical managers of small libraries. Managers of other small nonprofit or community organizations will also benefit from it. An introduction defines network security; outlines three goals of network security; discusses why a library should be…
Succession planning for technical experts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirk, Bernadette Lugue; Cain, Ronald A.; Dewji, Shaheen A.
This report describes a methodology for identifying, evaluating, and mitigating the loss of key technical skills at nuclear operations facilities. The methodology can be adapted for application within regulatory authorities and research and development organizations, and can be directly applied by international engagement partners of the Department of Energy’s National Nuclear Security Administration (NNSA). The resultant product will be of direct benefit to two types of NNSA missions: (1) domestic human capital development programs tasked to provide focused technical expertise to succeed an aging nuclear operations workforce, and (2) international safeguards programs charged with maintaining operational safeguards for developing/existing nuclearmore » power program in nations where minimal available resources must be used effectively. This report considers succession planning and the critical skills necessary to meet an institution’s goals and mission. Closely tied to succession planning are knowledge management and mentorship. In considering succession planning, critical skill sets are identified and are greatly dependent on the subject matter expert in question. This report also provides examples of critical skills that are job specific.« less
Rani, Manju; Nusrat, Sharmin; Hawken, Laura H
2012-10-16
Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.
2012-01-01
Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232
EOS Laser Atmosphere Wind Sounder (LAWS) investigation
NASA Technical Reports Server (NTRS)
Emmitt, George D.
1991-01-01
The related activities of the contract are outlined for the first year. These include: (1) attend team member meetings; (2) support EOS Project with science related activities; (3) prepare and Execution Phase plan; and (4) support LAWS and EOSDIS related work. Attached to the report is an appendix, 'LAWS Algorithm Development and Evaluation Laboratory (LADEL)'. Also attached is a copy of a proposal to the NASA EOS for 'LAWS Sampling Strategies and Wind Computation Algorithms -- Storm-Top Divergence Studies. Volume I: Investigation and Technical Plan, Data Plan, Computer Facilities Plan, Management Plan.'
Laparoscopic partial nephrectomy: Technical considerations and an update
Dominguez-Escrig, Jose L; Vasdev, Nikhil; O’Riordon, Anna; Soomro, Naeem
2011-01-01
The widespread use of radiological imaging (ultrasound, computed tomography and magnetic resonance imaging) has resulted in a steady increase in the incidental diagnosis of small renal masses. While open partial nephrectomy (OPN) remains the reference standard for the management of small renal masses, laparoscopic partial nephrectomy (LPN) continues to evolve. LPN is currently advocated to be at par with OPN oncologically. The steep learning curve and technical demand of LPN make it challenging to establish this as a new procedure. We present a detailed up-to-date review on the previous, current and planned technical considerations for the use of LPN, highlighting important surgical techniques, including single-port and robotic surgery, techniques on improving intra-operative haemostasis and the management of complications specific to LPN. PMID:22022109
Test plan : I-40 TTIS tourist intercept survey
DOT National Transportation Integrated Search
1998-06-01
This document assembles best practices and presents practical advice on how to acquire the software components of Intelligent Transportation Systems (ITS). The intended audience is the "customers" - the project leaders, technical contract managers, d...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., climate, and related crop monitoring activities. (d) Remote sensing. (1) Provide technical assistance, coordination, and guidance to Department agencies in planning, developing, and carrying out satellite remote... administrative, management, and budget information relating to Department's remote sensing activities. ...
An Organization Design for the PERSPAY Consolidated Data Center.
1983-06-01
GENERAL 25 B. PROGRAM DEVELOPMENT 30 C. COMPUTER OPERATIONS 33 D. TECHNICAL SUPPORT BRANCH 36 E. MANAGEMENT OF THE D.P. ORGANIZATION...support, and 4) management , including planning, administration, and control ( Brandon , Norton Gaydasch, Frank). The following list shows the... Management policy on just what the ADP installation is expected to do is an information requirement that must be satisfied in order for the operation to
The RITE Approach to Agile Acquisition
2013-04-01
SSCPAC. He currently provides project management and technical support to the Global Command and Control System–Joint (GCCS-J) Integrated Imagery and...the Strike Planning and Execution Systems Program Office (PMA-281). Boyce has a Bachelor of Science degree in information systems management and is...has since provided dedicated professional service to the USAF, NAVSUP, and SSCPAC. Roussel has a Bachelor of Science degree in management and a Master
Irrigator responses to groundwater resource management in northern Victoria, southeastern Australia
NASA Astrophysics Data System (ADS)
Gill, Bruce C.; Webb, John; Wilkinson, Roger; Cherry, Don
2014-10-01
In northern Victoria, farmers are the biggest users of groundwater and therefore the main stakeholders in plans that seek to sustainably manage the resource. Interviews with 30 irrigation farmers in two study areas, analysed using qualitative social research methods, showed that the overwhelming majority of groundwater users agreed with the need for groundwater management and thought that the current plans had achieved sustainable resource use. The farmers also expressed a strong need for clear technical explanations for management decisions, in particular easily understood water level data. The social licence to implement the management plans arose through effective consultation with the community during plan development. Several additional factors combined to gain acceptance for the plans: good data on groundwater usage and aquifer levels is available; irrigation farmers had been exposed to usage restrictions since the late 1990s; an ‘adaptive’ management approach is in use which allowed refinements to be readily incorporated and fortuitously, plan development coincided with the 1998-2009 drought, when declines in groundwater levels reinforced the usefulness of the plans. The imposition of a nation-wide water use reduction plan in 2012 had relatively little impact in Victoria because of the early implementation of effective groundwater management plans. However, economic difficulties that reduce groundwater users’ capacity to pay groundwater management charges mean that the future of the plans in Victoria is not assured. Nevertheless, the high level of trust that exists between Victorian irrigation farmers and the management agencies suggests that the continued use of a consultative approach will continue to produce workable outcomes. Lessons from the Victorian experience may be difficult to apply in other areas of groundwater use in Australia and overseas, where there may be a quite different history of development and culture of groundwater management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, Daniel; Berzins, Martin; Pennington, Robert
On November 19, 2014, the Advanced Scientific Computing Advisory Committee (ASCAC) was charged with reviewing the Department of Energy’s conceptual design for the Exascale Computing Initiative (ECI). In particular, this included assessing whether there are significant gaps in the ECI plan or areas that need to be given priority or extra management attention. Given the breadth and depth of previous reviews of the technical challenges inherent in exascale system design and deployment, the subcommittee focused its assessment on organizational and management issues, considering technical issues only as they informed organizational or management priorities and structures. This report presents the observationsmore » and recommendations of the subcommittee.« less
An Introduction to Quality Management: Selected Readings.
total quality management (TQM). Through the kind permission of a number of publishers, we have been able to reproduce here some key articles about...TQM. It is not the intent of this technical note to provide a comprehensive study of quality management , but rather to aid in planning for an...implementation of the Deming approach to TQM. Although the Navy aviation community chose the Deming approach to quality management , as reflected in the selected
SBA’s 7(j) Management Assistance Program: Changes Needed to Improve Efficiency and Effectiveness.
1981-09-29
Ctanges Needed;( im6 prove Efficiency nd Effectiveness. The Small Business Administration provides management and technical assistance to small busi ...Representatives This report, which was prepared pursuant to Public Law 95-507, discusses the Small Business Administration’s 7(j) Management Assistance...Program. The report discusses the need for better program planning and management and recommends that the Small Business Administration make a number of
Denver P. Burns
1986-01-01
Contains 23 papers presented in six technical sessions on forestry research management planning and evaluation. Primary topics focus on nontraditional views and sources of information and emerging technologies affecting forestry research; methods for identifying research needs and strategies required for implementation; and research evaluation at the individual,...
Policy Level Information on Logistics-Oriented Research.
1980-08-01
Logistics Planann and System Long-Range Management Technology Planning Evaluation of Rold Miasion of Support Organizacion Effective Cross-Service Policies...guidelines, solution procedures, etc. The documentation format (technical report, user’s manual , briefing slides, etc.) also falls into this category...CHECK AT LEAST ONE) PhD Dissertation SMaster’s Thesis 7 Memorandum L Briefing Q Technical Report 7 Software Product O Hardware Product Q7 User’s Manual
Code of Federal Regulations, 2011 CFR
2011-01-01
... eligible to receive 8(a) contracts, including: (a) Assistance to develop comprehensive business plans with... Participant's growth and development, including loan packaging; and (c) Assistance in obtaining equity and...
Geotechnical Asset Management Plan : Technical Report
DOT National Transportation Integrated Search
2017-06-30
Geotechnical assets which include rock and soil slopes, retaining walls, and material sites support and protect the Department's pavements and bridges, and provide the material from which these assets are built. They are the front line of the...
2015 Consequence Management Advisory Division's (CMAD) Annual Report
CMAD annual report for 2015 which covers activities such as providing technical support to the Ebola response decontamination planning and preparation efforts; the ricin responses in Regions 5 and 6; the Burkholderia pseudomallei response in Region.
Approach to the E-ELT dome and main structure challenges
NASA Astrophysics Data System (ADS)
Bilbao, Armando; Murga, Gaizka; Gómez, Celia; Llarena, Javier
2014-07-01
The E-ELT as a whole could be classified as an extremely challenging project. More precisely, it should be defined as an array of many different sub-challenges, which comprise technical, logistical and managerial matters. This paper reviews some of these critical challenges, in particular those related to the Dome and the Main Structure, suggesting ways to face them in the most pragmatic way possible. Technical challenges for the Dome and the Main Structure are mainly related to the need to upscale current design standards to an order of magnitude larger design. Trying a direct design escalation is not feasible; it would not work. A design effort is needed to cross hybridize current design standards with technologies coming from other different applications. Innovative design is therefore not a wish but a must. And innovative design comes along with design risk. Design risk needs to be tackled from two angles: on the one hand through thorough design validation analysis and on the other hand through extensive pre-assembly and testing. And, once again, full scale integrated pre-assembly and testing of extremely large subsystems is not always possible. Therefore, defining a comprehensive test plan for critical components, critical subsystems and critical subassemblies becomes essential. Logistical challenges are linked to the erection site. Cerro Armazones is a remote site and this needs to be considered when evaluating transport and erection requirements. But it is not only the remoteness of the site that needs to be considered. The size of both Dome and Main Structure require large construction cranes and a well defined erection plan taking into account pre-assembly strategies, limited plan area utilization, erection sequence, erection stability during intermediate stages and, very specifically, efficient coordination between the Dome and the Main Structure erection processes. Managerial issues pose another set of challenges in this project. Both the size of the project and its special technical characteristics require specific managerial skills. Due to the size of the project it becomes essential to effectively manage and integrate a large number of suppliers and fabricators, of very different nature and geographically distributed. Project management plans need to cope with this situation. Also, extensive on site activities require intensive on site organization in line with large construction management strategies. Finally, the technical edge of the project requires deep technical understanding at management level in order to be able to take sound strategic decisions throughout the project in terms of the overall project quality, cost and schedule.
DOT National Transportation Integrated Search
2006-01-01
Much of what is known about evacuations is based on preparations for incidents, such as hurricanes, for which there is advance warning. With advance warning, evacuations can be planned and managed using procedures and systems that have been developed...
Summary appraisals of the Nation's ground-water resources; Texas Gulf region
Baker, E.T.; Wall, James Ray
1974-01-01
Because significant amounts of ground water are available, the opportunities for expanded and conjunctive use of ground water and surface water should be considered in regional plans for water development and conservation. The complexities of water management and the difficulties of achieving an integrated system of total water management will require additional technical information.
Summary appraisals of the Nation's ground-water resources; Texas-Gulf region
Baker, E.T.; Wall, J.R.
1976-01-01
Because significant amounts of ground water are available, the opportunities for expanded and conjunctive use of ground water and surface water should be considered in regional plans for water development and conservation. The complexities of water management and the difficulties of achieving an integrated system of total-water management will require additional technical information.
Cumulative watershed effects of fuels management: a western synthesis
Robert Rummer
2006-01-01
Fuels management is an active term. It is an intentional, planned activity defined by consideration of fire behavior, silvicultural principles, ecological constraints, and the economic and technical limitations of the tools selected to implement the treatment. A forest operation is a tool used to manipulate vegetation or site condition in order to achieve some desired...
CERT Resiliency Engineering Framework
2007-03-01
Heightened threat level and increasing uncertainty Shorter-lived skills 5 Operational risk management problems Poor planning and execution No asset...increasingly effective & efficient Today’s operational environment No operational boundaries Pervasive & rapidly changing technology Dynamic & expanding risks ...management function Seen as a technical function or responsibility Searching for magic bullet: CobiT , ITIL, ISO17799, NFP1600 Poorly defined and measured
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less
NASA Astrophysics Data System (ADS)
Salazar, Sergio; Hernández, Sebastián
2015-04-01
Only until 2010 was enacted the first national policy related to the integrated management of water resources in Colombia. In 2011 was established the Directorate for Integrated Water Resources Management within the Ministry of Environment and Sustainable Development. Between 2010 to 2013 were adopted the regulatory instruments to be developed within the hierarchical structure for spatial environmental planning around the water resources, considering both a transdisciplinary framework and a multi-ethnic and multi-participatory approach. In this context, there is a breakthrough in the development of strategic and tactic actions summarized as follows: i) technical guidelines or projects were developed for the spatial environmental planning at the macroscale river basins (i.e. Magdalena-Cauca river basin with 2.3 million hectares), meso-scale (river basins from 50.000 to 2 million hectares and aquifers) and local scale (catchments areas less than 50.000 hectares); ii) there is an advance in the knowledge of key hydrological processes in the basins of the country as well as actions to restore and preserve ecosystems essential for the regulation of water supply and ecosystem services; iii) demand characterization introducing regional talks with socio-economic stakeholders and promoting water efficiency actions; iv) water use regulation as a way for decontamination and achieving quality standards for prospective uses; v) introduction of risks analysis associated with water resources in the spatial environmental planning and establishment of mitigation and adaptation measures; vi) strengthening the monitoring network of water quality and hydrometeorological variables; vii) strengthening interactions with national and international research as well as the implementation of a national information system of water resources; viii) steps towards water governance with the introduction of socio-economic stakeholder in the spatial environmental planning and implementation of actions to a water culture and water use conflict management. With the premise that "access to information and research are crucial for the integrated water resources management", different planning tools have been implemented in several case studies, considering several hydro-climatic, bio-geographic and socio-cultural contexts. It was supported with a transdisciplinary approach (integrated visions from disciplines such as hydrology, biology, ecology, pedology, geomorphology, geology, economy and social sciences among others) with a key protagonist: the technical and scientific capacity available in the country. From this practical experiences at different spatial scales, we have identified a battery of key challenges: i) extend the spatial and temporal coverage of hydrometeorological and water quality monitoring networks at regional scale; ii) expand the knowledge base of aquatic and transition ecosystem as well as the environmental baseline from regional to local scales; iii) researches about the state of subterranean water resources and their interactions with lotic and lentic systems; iv) move towards the establishment of decision support systems that integrate policy objectives at different scales; v) strengthening technical and scientific capacity of the country expanding academic and research public offer; vi) unifying technical criteria and standards environment management policy; vii) institutional architecture redesign. If there is a political and socio-economical consensus about the urgency to move towards the key aspect summarized here, Colombian people will be giving the definitive step towards integrated water resources management as a cornerstone of spatial environmental planning and water governance. Disclaimer: The views and opinions expressed in this abstract are those of the authors and do not necessarily reflect the official position of the Colombian Ministry of Environment and Sustainable Development or any agency of the Colombian government.
Monitoring and Evaluating Nonpoint Source Watershed Projects
This guide is written primarily for those who develop and implement monitoring plans for watershed management projects. it can also be used evaluate the technical merits of monitoring proposals they might sponsor. It is an update to the 1997 Guide.
Code of Federal Regulations, 2013 CFR
2013-01-01
... economic planning activities to determine the viability of a potential value-added venture, and... and sufficient to evidence the viability of the venture. It may also contain background information... analysis by a qualified consultant of the economic, market, technical, financial, and management...
Code of Federal Regulations, 2014 CFR
2014-01-01
... economic planning activities to determine the viability of a potential value-added venture, and... and sufficient to evidence the viability of the venture. It may also contain background information... analysis by a qualified consultant of the economic, market, technical, financial, and management...
Code of Federal Regulations, 2012 CFR
2012-01-01
... economic planning activities to determine the viability of a potential value-added venture, and... and sufficient to evidence the viability of the venture. It may also contain background information... analysis by a qualified consultant of the economic, market, technical, financial, and management...
Administrative Information Systems Plan for FY89
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-11-01
The Administrative Information Systems (AIS) Plan was developed to prioritize, track, and control the cost of AIS activities. This annually published plan, in conjunction with quarterly status reports, measures projected AIS activities and progress. The AIS Plan and quarterly reporting are administered jointly by the Director of Computing and an Organization 30 director. Priority development projects are clearly defined and closely managed efforts that consume significant resources. Directorate supplementals describe other AIS activity within each directorate, which may include: production support; technical support; development activity; and other AIS effort.
Nkengasong, John N; Mesele, Tsehaynesh; Orloff, Sherry; Kebede, Yenew; Fonjungo, Peter N; Timperi, Ralph; Birx, Deborah
2009-06-01
Medical laboratory services are an essential, yet often neglected, component of health systems in developing countries. Their central role in public health, disease control and surveillance, and patient management is often poorly recognized by governments and donors. However, medical laboratory services in developing countries can be strengthened by leveraging funding from other sources of HIV/AIDS prevention, care, surveillance, and treatment programs. Strengthening these services will require coordinated efforts by national governments and partners and can be achieved by establishing and implementing national laboratory strategic plans and policies that integrate laboratory systems to combat major infectious diseases. These plans should take into account policy, legal, and regulatory frameworks; the administrative and technical management structure of the laboratories; human resources and retention strategies; laboratory quality management systems; monitoring and evaluation systems; procurement and maintenance of equipment; and laboratory infrastructure enhancement. Several countries have developed or are in the process of developing their laboratory plans, and others, such as Ethiopia, have implemented and evaluated their plan.
NASA Software Documentation Standard
NASA Technical Reports Server (NTRS)
1991-01-01
The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.
CrossTalk: The Journal of Defense Software Engineering. Volume 20, Number 3, March 2007
2007-03-01
Capability Maturity Model ® Integration (CMMI®). CMU Software Engineering Institute <www.sei.cmu.edu/cmmi>. 5. ISO /IEC 27001 :2005. Information Security...international standards bodies – International Organization for Standardi- zation ( ISO ) and International Electro- technical Commission (IEC) – are working on a...number of projects that affect soft- ware security: • The ISO Technical Management Board (TMB) performs strategic planning and coordination for ISO
[Development of a service on line advice and information technology management for health].
Berrospi Polo, Victor; Rodriguez Abad, Juan; Bobadilla Aguilar, Juan; Di Liberto Moreno, Carlos; Díaz Arroyo, Cecilia; Rafael Quipan, Carlos
2015-10-01
To validate an advisory service and online information technology management for health and helps to make assessment and acquisition processes an informed medical equipment according to the market and the needs of the health institutions. Internet via a technological solution supported ona data base containing systematic and updated information on technical specifications of 25 compared medical equipment, the same reference prices, list of suppliers, agents and / or producers and technical standards are developed. The"virtual" technical assistance was made with the support of a team of specialists in Health Technology Management, the decision makers in the planning, evaluation and procurement of biomedical equipment. The validation of the service was conducted by involving specialists in the field of Health Technology Management, from different disciplines and institutions who worked in health, public and private. They used the service for a period of time to verify its feasibility of use as well as its usefulness for their planning, evaluation and procurement of biomedical equipment. To these experts we applied a survey before and after them about the software developed in this project. We found that it is common to use the internet to search for information on medical equipment.Also,an increase on the view that the application will help in procurement of biomedical equipment(40% to 78%) was observed, it will improve the information system(40% to 89%) and communication among physicians,nurses, planners, engineers and other professionals involved in this process(20% to 78%). There is a need for a technological tool available with such features contribute to technology management in Peru.
Harahsheh, Ashraf S; O'Byrne, Michael L; Pastor, Bill; Graham, Dionne A; Fulton, David R
2017-11-01
We conducted a study to assess test characteristics of red-flag criteria for identifying cardiac disease causing chest pain and technical charges of low-probability referrals. Accuracy of red-flag criteria was ascertained through study of chest pain Standardized Clinical Assessment and Management Plans (SCAMPs®) data. Patients were divided into 2 groups: Group1 (concerning clinical elements) and Group2 (without). We compared incidence of cardiac disease causing chest pain between these 2 groups. Technical charges of Group 2 were analyzed using the Pediatric Health Information System database. Potential savings for the US population was estimated using National Ambulatory Medical Care Survey data. Fifty-two percent of subjects formed Group 1. Cardiac disease causing chest pain was identified in 8/1656 (0.48%). No heart disease was identified in patients in Group 2 ( P = .03). Applying red-flags in determining need for referral identified patients with cardiac disease causing chest pain with 100% sensitivity. Median technical charges for Group 2, over a 4-year period, were US2014$775 559. Eliminating cardiac testing of low-probability referrals would save US2014$3 775 182 in technical charges annually. Red-flag criteria were an effective screen for children with chest pain. Eliminating cardiac testing in children without red-flags for referral has significant technical charge savings.
NASA Technical Reports Server (NTRS)
1981-01-01
The Infrared Telescope (IRT) is designed to survey extended celestial sources of infrared radiation between 4 and 120 micrometers wavelength. It will provide data regarding Space Shuttle induced environmental contamination and the zodical light. And, it will provide experience in the management of large volumes of superfluid helium in the space environment.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)
NASA Technical Reports Server (NTRS)
1992-01-01
Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.
ERCMExpress. Volume 2, Issue 2
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
This issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress" introduces the National Clearinghouse for Educational Facilities (NCEF), a free public service that provides information on planning, designing, funding, building, improving and maintaining safe, healthy, high-performance schools. NCEF is…
Department of Defense Software Factbook
2017-07-07
parameters, these rules of thumb may not provide a lot of value to project managers estimating their software efforts. To get the information useful to them...organization determine the total cost of a particular project , but it is a useful metric to technical managers when they are required to submit an annual...outcome. It is most likely a combination of engineering, management , and funding factors. Although a project may resist planning a schedule slip, this
Establishing a scientific and technical information program: Planning and resource management
NASA Technical Reports Server (NTRS)
Blados, Walter R.
1992-01-01
In the last 50 years, technological advances have accelerated at a rate unprecedented in history. We are experiencing a tremendous expansion of scientific and technological effort in many directions, and the result is a fantastic increase in the accumulation of scientific and technical information (STI) and knowledge. An integral part of the research and development (R&D) process is the STI associated with it. STI is both a raw material (input) and a product (output) of this process. The topics addressed include the following: the value of STI, management of an STI program, program policy and guidance, organizational structure, data sources, training/orientation, and the current information environment.
SERC 2014 2018 Technical Plan: 2016 Update
2016-02-18
Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents
The Australian response: pandemic influenza preparedness.
Horvath, John S; McKinnon, Moira; Roberts, Leslee
2006-11-20
Australia's preparedness for a potential influenza pandemic involves many players, from individual health carers to interdepartmental government committees. It embraces a wide number of strategies from the management of the disease to facilitating business continuity. The key strategy underlying Australia's planned response is an intensive effort to reduce transmission of the virus. This includes actions to reduce the likelihood of entry of the virus into the country and to contain outbreaks when they occur. Containment will provide time to allow production of a matched vaccine. The health strategies are outlined in the Australian health management plan for pandemic influenza. The plan is accompanied by technical annexes setting out key considerations and guidelines in the areas of clinical management and infection control. National plans present overall strategies and guidance, but the operational details can only be determined by individual states and territories, regions, and the services themselves. Primary health care practices will be on the frontline of an influenza pandemic. Every practice needs a plan that defines the roles of staff, incorporates infection control and staff protection measures, and considers business continuity. Most importantly, a practice needs to know how to implement that plan.
This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986. The Superfund Enterprise Management System (SEMS) contains basic site description, location, schedule of activities, enforcement and settlement data, contaminants and selected remedy and much more, as well as the records that clearly document site decisions. This asset also includes sampling data and lab results (CLPSS, EDDs), redevelopment and technical assistance case studies, site reuse and land revitalization information, EPAOSC.net information, Superfund Technical Assistance Grants information, site management information records (RODs, Remediation plans, cleanup directives), contract management information, and more.Superfund site management information can also be found in agency wide systems such as EAS and COMPASS.
Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1
NASA Technical Reports Server (NTRS)
Estes, Ronald H. (Editor)
1993-01-01
This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.
Research and Technology Operating Plan Summary, Fiscal Year 1972 Research and Technology Program
NASA Technical Reports Server (NTRS)
1971-01-01
The NASA Research and Technology program for FY 1972 is presented. It is a compilation of the summary portions of each of the RTOPs (Research and Technology Operating Plan) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities.
Research and Technology Operating Plan. Summary: Fiscal year 1976 research and technology program
NASA Technical Reports Server (NTRS)
1976-01-01
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA was presented. The document is arranged in five sections. The first one contains citations and abstracts of the RTOP. This is followed by four indexes: subject, technical monitor, responsible NASA organization, and RTOP number.
Energy Materials Coordinating Committee (EMaCC). Annual technical report, Fiscal Year 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2002-08-01
The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations.
ERIC Educational Resources Information Center
McLellan, Vin
1980-01-01
The Wang Institute of Graduate Studies plans to offer a master's degree in software engineering. The development of an academic program to produce superior, technically qualified managers for the computer industry's software production is discussed. (Journal availability: Datamation, 666 Fifth Ave., New York, NY 10103.) (MLW)
Probe interface design consideration. [for interplanetary spacecraft missions
NASA Technical Reports Server (NTRS)
Casani, E. K.
1974-01-01
Interface design between a probe and a spacecraft requires not only technical considerations but also management planning and mission analysis interactions. Two further aspects of importance are the flyby versus the probe trade-off, and the relay link design and data handling optimization.
Uncertainty Management in Urban Water Engineering Adaptation to Climate Change
Current water resource planning and engineering assume a stationary climate, in which the observed historical water flow rate and water quality variations are often used to define the technical basis. When the non-stationarity is considered, however, climate change projection co...
76 FR 30229 - Shipping Coordinating Committee; Notice of Committee Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
.... --Strategy and planning. --Organizational reforms. --Resource management. --Technical Co-operation Fund--biennial allocation to support the ITCP Programme for 2012-2013. --Results-based budget. --Voluntary IMO... FSS Code for communication equipment for fire-fighting teams. --Development of guidelines for use of...
DOT National Transportation Integrated Search
1998-11-01
The purpose of this working paper is to present estimates of potential safety benefits resulting from full implementation of Intelligent Transportation Systems (ITS) in the United States. These estimates were derived by integrating results from a num...
48 CFR 1352.215-75 - Evaluation criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
... relative importance among the technical evaluation factors.] Based upon the results of the integrated... as the offeror's planned management of consultants and subcontractors, if applicable. Factor 2... likelihood that that offeror can successfully perform the contract requirements and the degree of the risk of...
Feasibility of lane closures using probe data : technical brief.
DOT National Transportation Integrated Search
2017-04-01
This study developed an on-line system analysis tool called the Work Zone Interactive : Management Application - Planning (WIMAP-P), an easy-to-use and easy-to-learn tool for : predicting the traffic impact caused by work zone lane closures on freewa...
The Spanish General Radioactive Waste Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Espejo, J.M.; Abreu, A.
This paper mainly describes the strategies, the necessary actions and the technical solutions to be developed by ENRESA in the short, medium and long term, aimed at ensuring the adequate management of radioactive waste, the dismantling and decommissioning of nuclear and radioactive facilities and other activities, including economic and financial measures required to carry them out. Starting with the Spanish administrative organization in this field, which identifies the different agents involved and their roles, and after referring to the waste generation, the activities to be performed in the areas of LILW, SF and HLW management, decommissioning of installations and othersmore » are summarized. Finally, the future management costs are estimated and the financing system currently in force is explained. The so-called Sixth General Radioactive Waste Plan (6. GRWP), approved by the Spanish Government, is the 'master document' of reference where all the above mentioned issues are contemplated. In summary: The 6. GRWP includes the strategies and actions to be performed by Enresa in the coming years. The document, revised by the Government and subject to a process of public information, underlines the fact that Spain possesses an excellent infrastructure for the safe and efficient management of radioactive waste, from the administrative, technical and economic-financial points of view. From the administrative point of view there is an organisation, supported by ample legislative developments, that contemplates and governs the main responsibilities of the parties involved in the process (Government, CSN, ENRESA and waste producers). As regards the technical aspect, the experience accumulated to date by Enresa is particularly significant, as are the technologies now available in the field of management and for dismantling processes. As regards the economic-financial basis, a system is in place that guarantees the financing of radioactive waste management costs. This system is based on the generation of funds up front, during the operating lifetime of the facilities, through the application of fees established by Statutory provisions. Finally, a mandatory mechanism of annual revision for both technical issues and economic and financial aspects, allows to have updated all the courses of action. (authors)« less
Contraceptive security, information flow, and local adaptations: family planning Morocco.
Chandani, Y; Breton, G
2001-12-01
Many developing countries increasingly recognize and acknowledge family planning as a critical part of socio-economic development. However, with few health dollars to go around, countries tend to provide essential drugs for curative care, rather than for family planning products. Donors have historically provided free contraceptives for family planning services. Whether products are donated or purchased by the country, a successful family planning program depends on an uninterrupted supply of products, beginning with the manufacturer and ending with the customer. Any break in the supply chain may cause a family planning program to fail. A well-functioning logistics system can manage the supply chain and ensure that the customers have the products they need, when they need them. Morocco was selected for the case study. The researchers had ready access to key informants and information about the Logistics Management Information System. Because the study had time and resource constraints, research included desktop reviews and interview, rather than data collection in the field. The case study showed that even in a challenging environment an LMIS can be successfully deployed and fully supported by the users. It is critical to customize the system to a country-specific situation to ensure buy-in for the implementation. Significant external support funding and technical expertise are critical components to ensure the initial success of the system. Nonetheless, evidence from the case study shows that, after a system has been implemented, the benefits may not ensure its institutionalization. Other support, including local funding and technical expertise, is required.
Stewart D. Allen; Denise A. Wickwar; Fred P. Clark; Robert R. Dow; Robert Potts; Stephanie A. Snyder
2009-01-01
In recent years, the Forest Service and the public have placed increasing priority on making sure that management of public lands takes into account the needs of nearby communities, regional residents, national residents, and even members of the public who may not currently visit public lands. As awareness and commitment to this wide range of stakeholders grows, so...
Introduction to Defense Acquisition Management
1989-03-01
the system after Most new systems follow the same formatted and its usefullness in the weapon inventory predictable life cycle, and fit the model...natives for system concept development Statement (MNS) setting forth requirements need- -An acquisition strategy is developed to guide ed to meet the...6 BUSINESS, FINANCIAL AND TECHNICAL ASPECTS OF SYSTEMS ACQUISITION Management of the systems acquisition process The acquisition planning phase of the
1978-08-01
weeding I I ORGANISATION & MANAGEMENT Aims and objectives, staffing, promotional activities, identifying u;ers 12 NETWORKS & EXTERNAL SOURCES OF...Acquisition Clerks with typing capability are required for meticulous recordkeeping. Typing capability of 50 words per minute and a working knowledge ...81 Adminhistration and Management Includes management planning and research. 64 Numerical Analysis Includes iteration, difference equations, and 82
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
Resources planning for radiological incidents management
NASA Astrophysics Data System (ADS)
Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.
2017-01-01
Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.
DOT National Transportation Integrated Search
1999-10-31
In May, 1997, the National Private Truck Councils (NPTC) Private Fleet Management Institute (PFMI) began a research program in cooperation with Sue Roberts Health Concepts, Inc., ATA Foundation, Inc., and the Federal Motor Carrier Safety Administr...
Uncertainty Management in Urban Water Engineering Adaptation to Climate Change - abstract
Current water resource planning and engineering assume a stationary climate, in which the observed historical water flow rate and water quality variations are often used to define the technical basis. When the non-stationarity is considered, however, climate change projection co...
Common Standards for Career Education Programs
ERIC Educational Resources Information Center
Missouri Department of Elementary and Secondary Education, 2012
2012-01-01
The Office of College and Career Readiness has developed the "Common Standards for Career Education Programs." The six common standards are: (1) Program Management and Planning; (2) Curriculum; (3) Instruction; (4) Professional Development; (5) Career and Technical Student Organizations; and (6) Instructional Facilities and Equipment.…
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
Integrated Data & Analysis in Support of Informed and Transparent Decision Making
NASA Astrophysics Data System (ADS)
Guivetchi, K.
2012-12-01
The California Water Plan includes a framework for improving water reliability, environmental stewardship, and economic stability through two initiatives - integrated regional water management to make better use of local water sources by integrating multiple aspects of managing water and related resources; and maintaining and improving statewide water management systems. The Water Plan promotes ways to develop a common approach for data standards and for understanding, evaluating, and improving regional and statewide water management systems, and for common ways to evaluate and select from alternative management strategies and projects. The California Water Plan acknowledges that planning for the future is uncertain and that change will continue to occur. It is not possible to know for certain how population growth, land use decisions, water demand patterns, environmental conditions, the climate, and many other factors that affect water use and supply may change by 2050. To anticipate change, our approach to water management and planning for the future needs to consider and quantify uncertainty, risk, and sustainability. There is a critical need for information sharing and information management to support over-arching and long-term water policy decisions that cross-cut multiple programs across many organizations and provide a common and transparent understanding of water problems and solutions. Achieving integrated water management with multiple benefits requires a transparent description of dynamic linkages between water supply, flood management, water quality, land use, environmental water, and many other factors. Water Plan Update 2013 will include an analytical roadmap for improving data, analytical tools, and decision-support to advance integrated water management at statewide and regional scales. It will include recommendations for linking collaborative processes with technical enhancements, providing effective analytical tools, and improving and sharing data and information. Specifically, this includes achieving better integration and consistency with other planning activities; obtaining consensus on quantitative deliverables; building a common conceptual understanding of the water management system; developing common schematics of the water management system; establishing modeling protocols and standards; and improving transparency and exchange of Water Plan information.
Reducing environmental noise impacts: A USAREUR noise management program handbook
NASA Astrophysics Data System (ADS)
Feather, Timothy D.; Shekell, Ted K.
1991-06-01
Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.
[Implementation of a safety and health planning system in a teaching hospital].
Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P
2007-01-01
University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taylor, Antoniette J
Los Alamos National Laboratory (LANL) uses external peer review to measure and continuously improve the quality of its science, technology and engineering (STE). LANL uses capability reviews to assess the STE quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. STE capabilities are define to cut across directorates providing a more holistic view of the STE quality, integration to achieve mission requirements, and mission relevance. The scope of these capabilities necessitate that there will be significant overlap inmore » technical areas covered by capability reviews (e.g ., materials research and weapons science and engineering). In addition, LANL staff may be reviewed in different capability reviews because of their varied assignments and expertise. LANL plans to perform a complete review of the Laboratory's STE capabilities (hence staff) in a three-year cycle. The principal product of an external review is a report that includes the review committee's assessments, commendations, and recommendations for STE. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). This report will be used by Laboratory Management for STE assessment and planning. The report is also provided to the Department of Energy (DOE) as part of LANL's Annual Performance Plan and to the Los Alamos National Security (LANS) LLC's Science and Technology Committee (STC) as part of its responsibilities to the LANS Board of Governors. LANL has defined fourteen STE capabilities. Table 1 lists the five STE capabilities that LANL Management (Director, PADSTE, technical Associate Directors) have identified for review in Fiscal Year (FY) 2009.« less
WastePlan model implementation for New York State. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Visalli, J.R.; Blackman, D.A.
1995-07-01
WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less
2013-07-01
water resource project planning and management; the authors also seek to identify any research needs to accommodate that goal. This technical note and...review of the state of the science of EGS and highlights the types of analytical tools, techniques, and considerations that would be needed within a...instructions, searching existing data sources, gathering and maintaining the data needed , and completing and reviewing the collection of information. Send
ERIC Educational Resources Information Center
Pressley, Warren H., Jr.
In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…
2007-05-01
National Association of Clean Water Agencies Shelly Foston Meridian Institute Michael Gritzuk Pima County (AZ) Wastewater Management Department Genevieve...agencies to assist small and medium systems, and it has helped fund and develop a variety of Web casts and security trainings. Although drinking water...trainings, conference calls, Web casts , and other communica- tions; (2) provide administrative support; (3) provide technical support; and (4
A Literature Review On Multimodal Freight Transportation Planning Under Disruptions
NASA Astrophysics Data System (ADS)
Rosyida, E. E.; Santosa, B.; Pujawan, I. N.
2018-04-01
This paper reviews publication that focuses on multimodal freight transportation planning under disruptions. In this paper, disruptions are specified by the level of the disruptions occurs and the scope of its effect. This becomes an important distinction since the cause and effect that may occur at different levels. The failure to make this distinction has implications for how we understand and manage. The reviewed papers include those that develop framework, model, and technical procedure for freight transportation. Finally, we provide an outlook of future research directions on the domain of transportation planning.
Work management plan for data systems and analysis directorate
NASA Technical Reports Server (NTRS)
Nichols, L. R.
1979-01-01
A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.
Chaffin, Brian C; Mahler, Robert L; Wulfhorst, J D; Shafii, Bahman
2015-01-01
Collaborative watershed group experiences reveal commonalities in their approaches to facilitate decentralized and inclusive watershed planning and management in the United States, and increasingly around the world. Although watershed groups are widely recognized in the United States for positive accomplishments across local, state, and regional scales, the role of government agencies as watershed group partners often remains ambiguous and inconsistent. This paper details results of a survey used to determine the status of Pacific Northwest (PNW) watershed group-agency partnerships relative to planning and management. Specific inquiry was directed toward: (1) the role of technical information flow; and (2) watershed group needs. Mail surveys were administered to 304 watershed group participants in Idaho, Oregon, and Washington. Sixty-nine percent of the surveys were completed and returned. Based on the collected survey data, PNW watershed groups rely heavily on agency officials for technical watershed information. Respondents perceive support of state government to be the highest relative to federal agencies, local governments, and university Extension offices. However, evidence from the survey suggests that partnerships are underutilized across all agencies and organizations concurrently vested in watershed planning and management in the PNW. Sustained operational funding, increased group participation, and baseline watershed data are the most pressing needs of PNW watershed groups and present a significant opportunity for expanding watershed group-agency partnerships.
NASA Astrophysics Data System (ADS)
Chaffin, Brian C.; Mahler, Robert L.; Wulfhorst, J. D.; Shafii, Bahman
2015-01-01
Collaborative watershed group experiences reveal commonalities in their approaches to facilitate decentralized and inclusive watershed planning and management in the United States, and increasingly around the world. Although watershed groups are widely recognized in the United States for positive accomplishments across local, state, and regional scales, the role of government agencies as watershed group partners often remains ambiguous and inconsistent. This paper details results of a survey used to determine the status of Pacific Northwest (PNW) watershed group-agency partnerships relative to planning and management. Specific inquiry was directed toward: (1) the role of technical information flow; and (2) watershed group needs. Mail surveys were administered to 304 watershed group participants in Idaho, Oregon, and Washington. Sixty-nine percent of the surveys were completed and returned. Based on the collected survey data, PNW watershed groups rely heavily on agency officials for technical watershed information. Respondents perceive support of state government to be the highest relative to federal agencies, local governments, and university Extension offices. However, evidence from the survey suggests that partnerships are underutilized across all agencies and organizations concurrently vested in watershed planning and management in the PNW. Sustained operational funding, increased group participation, and baseline watershed data are the most pressing needs of PNW watershed groups and present a significant opportunity for expanding watershed group-agency partnerships.
Project resources planning and control
NASA Technical Reports Server (NTRS)
Sibbers, C. W.
1984-01-01
This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.
Visual Decision Support Tool for Supporting Asset ...
Abstract:Managing urban water infrastructures faces the challenge of jointly dealing with assets of diverse types, useful life, cost, ages and condition. Service quality and sustainability require sound long-term planning, well aligned with tactical and operational planning and management. In summary, the objective of an integrated approach to infrastructure asset management is to assist utilities answer the following questions:•Who are we at present?•What service do we deliver?•What do we own?•Where do we want to be in the long-term?•How do we get there?The AWARE-P approach (www.aware-p.org) offers a coherent methodological framework and a valuable portfolio of software tools. It is designed to assist water supply and wastewater utility decision-makers in their analyses and planning processes. It is based on a Plan-Do-Check-Act process and is in accordance with the key principles of the International Standards Organization (ISO) 55000 standards on asset management. It is compatible with, and complementary to WERF’s SIMPLE framework. The software assists in strategic, tactical, and operational planning, through a non-intrusive, web-based, collaborative environment where objectives and metrics drive IAM planning. It is aimed at industry professionals and managers, as well as at the consultants and technical experts that support them. It is easy to use and maximizes the value of information from multiple existing data sources, both in da
Vulnerability Management for an Enterprise Resource Planning System
NASA Astrophysics Data System (ADS)
Goel, Shivani; Kiran, Ravi; Garg, Deepak
2012-09-01
Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.
Azorbo, S; Muna, C
1993-01-01
The training and technical assistance programs of the Center for African Family Studies (CAFS), which is part of the International Planned Parenthood Federation for the African Region, were described. Programs included service delivery, management development, family life education, family planning communication, and research monitoring and evaluation. Several courses were offered: a week-long contraceptive technology update course for trainers and supervisors of family planning programs. Management training needs were filled through a 6-week middle level management course, a 2-week senior level management course, a 4-week community based family planning program course, a 6-week financial management of family planning and reproductive health programs course, and a 5-week course in leadership skills for management of women and health programs. Family life education courses were offered under the CAFS Women and Health Program for teachers, curriculum developers, youth leaders, and those working with young people for 3 weeks. Course issues of discussion included population and development, the family in contemporary African life, and policy legislation and laws to promote young people's health and social psychological and ethical aspects of adolescent sexuality. Family planning communication training programs were directed to strengthening IEC knowledge and skills over a 4-week period for senior and middle level personnel. The 3-week press course aimed to train journalists in print and electronic media for French-speaking countries who could gain cover population and family planning issues. The family planning research and evaluation course over 4 weeks aimed to increase the knowledge and skills of health personnel in project design, implementation, monitoring, and evaluation, in order to conduct assessment of program effectiveness. The course was directed to senior and middle level manager researchers, population project directors, and personnel of women-centered projects.
TMT approach to observatory software development process
NASA Astrophysics Data System (ADS)
Buur, Hanne; Subramaniam, Annapurni; Gillies, Kim; Dumas, Christophe; Bhatia, Ravinder
2016-07-01
The purpose of the Observatory Software System (OSW) is to integrate all software and hardware components of the Thirty Meter Telescope (TMT) to enable observations and data capture; thus it is a complex software system that is defined by four principal software subsystems: Common Software (CSW), Executive Software (ESW), Data Management System (DMS) and Science Operations Support System (SOSS), all of which have interdependencies with the observatory control systems and data acquisition systems. Therefore, the software development process and plan must consider dependencies to other subsystems, manage architecture, interfaces and design, manage software scope and complexity, and standardize and optimize use of resources and tools. Additionally, the TMT Observatory Software will largely be developed in India through TMT's workshare relationship with the India TMT Coordination Centre (ITCC) and use of Indian software industry vendors, which adds complexity and challenges to the software development process, communication and coordination of activities and priorities as well as measuring performance and managing quality and risk. The software project management challenge for the TMT OSW is thus a multi-faceted technical, managerial, communications and interpersonal relations challenge. The approach TMT is using to manage this multifaceted challenge is a combination of establishing an effective geographically distributed software team (Integrated Product Team) with strong project management and technical leadership provided by the TMT Project Office (PO) and the ITCC partner to manage plans, process, performance, risk and quality, and to facilitate effective communications; establishing an effective cross-functional software management team composed of stakeholders, OSW leadership and ITCC leadership to manage dependencies and software release plans, technical complexities and change to approved interfaces, architecture, design and tool set, and to facilitate effective communications; adopting an agile-based software development process across the observatory to enable frequent software releases to help mitigate subsystem interdependencies; defining concise scope and work packages for each of the OSW subsystems to facilitate effective outsourcing of software deliverables to the ITCC partner, and to enable performance monitoring and risk management. At this stage, the architecture and high-level design of the software system has been established and reviewed. During construction each subsystem will have a final design phase with reviews, followed by implementation and testing. The results of the TMT approach to the Observatory Software development process will only be preliminary at the time of the submittal of this paper, but it is anticipated that the early results will be a favorable indication of progress.
1987-04-01
managerial talent and management style and behaviour on the basis of fixed and practised managerial principles. However, the material aspect, that is...motivation is encouraged by - immaterial incentives extrinsic motivation - material incentives on the one hand and by - management style and bihaviour...Logistics Management & Information Programs 26 Bid Victor Division 75996 Pans Armees NASA Headquarters (Code NIT) France Washington DC 20546 USA
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...
IPM for Pennsylvania Schools: A How-To Manual.
ERIC Educational Resources Information Center
Martz, Eston, Ed.
This manual presents practical advice on planning and adopting an integrated pest management (IPM) program for Pennsylvania educational facilities. The manual covers how to implement a school IPM, school IPM operational information for the school administrator, and technical information for Pennsylvania schools concerning various pests found in…
Developing a Total Quality Improvement Course for the Preparation of Technical-Management Personnel.
ERIC Educational Resources Information Center
Zargari, Ahmad
1997-01-01
Presents information about the need for, planning, and implementation of a total quality improvement course for undergraduate technology education students. The course involves the study of total quality concepts and their impact on the quality and competitiveness of industrial products. (JOW)
78 FR 68022 - Notice of Request for Extension of a Currently Approved Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-13
... Business Opportunity Grant (RBOG) program is to promote sustainable economic development in rural areas... economic development planning and technical assistance for rural businesses. The regulations contain... may be sent to Jeanne Jacobs, Regulations and Paperwork Management Branch, Rural Development, U.S...
NASA management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Peters, F.
1975-01-01
The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.
The Large Space Structures Technology Program
1992-04-01
Organization and Plan--The LSSTP was initiated in July 1985. It was conceived by Jerome Pearson, who, as leader of the Vibration Group, was responsible... Jerome Pearson was named project manager and Terry Hertz from the Analysis and Optimization Branch was his deputy. The technical disciplines and the...continued until the end of 1990. The LSSTP was originally managed by Jerome Pearson, in addition to his responsibilities as Vibration Group leader. Terry
2007-11-27
underlying technical problem—perhaps as a syndrome (collection of symptoms ) or perhaps in terms of the underlying mechanism. The medical analogy is...be noted that the procuring contracting officer ( PCO ) at the Major Command headquarters, where the services acquisition was centrally planned and...executed, delegated the contract to the administrative contracting officer at the installation where the contract was administered. Thus, the PCO
Ernest Orlando Lawrence Berkeley National Laboratory Institutional Plan FY 2000-2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chartock, Mike; Hansen, Todd
1999-08-01
The FY 2000-2004 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategicmore » management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.« less
NASA Technical Reports Server (NTRS)
1973-01-01
Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
Hefelfinger, Jenny; Patty, Alice; Ussery, Ann; Young, Walter
2013-10-24
This study assessed the value of technical assistance provided by state health department expert advisors and by the staff of the National Association of Chronic Disease Directors (NACDD) to community groups that participated in the Action Communities for Health, Innovation, and Environmental Change (ACHIEVE) Program, a CDC-funded health promotion program. We analyzed quantitative and qualitative data reported by community project coordinators to assess the nature and value of technical assistance provided by expert advisors and NACDD staff and the usefulness of ACHIEVE resources in the development and implementation of community action plans. A grounded theory approach was used to analyze and categorize phrases in text data provided by community coordinators. Open coding placed conceptual labels on text phrases. Frequency distributions of the quantitative data are described and discussed. The most valuable technical assistance and program support resources were those determined to be in the interpersonal domain (ie, interactions with state expert advisors, NACDD staff, and peer-to-peer support). The most valuable technical assistance events were action institutes, coaches' meetings, webinars, and technical assistance conference calls. This analysis suggests that ACHIEVE communities valued the management and training assistance provided by expert advisors and NACDD staff. State health department expert advisors provided technical guidance and support, including such skills or knowledge-based services as best-practice strategies, review and discussion of community assessment data, sustainability planning, and identification of possible funding opportunities. NACDD staff led development and implementation of technical assistance events.
Educational Accountability and the Need for Comprehensive Evaluation in TAFE.
ERIC Educational Resources Information Center
White, J. L.
This paper seeks to provide a rationale for evaluating Technical and Further Education (TAFE) programs by using a management system approach that is based on corporate planning. The first section reviews the sources of increased demands for accountability in TAFE (societal, economic, government, and legislative sources) and examines various…
Helping the Public Decide: The Case of Radioactive Waste Management.
ERIC Educational Resources Information Center
Abrams, Nancy E.; Primack, Joel R.
1980-01-01
The model proposed in the article"critical review of public assessment" would encourage participation of varied publics in the review process at stages most appropriate for their own special interests and expertise. The authors suggest the outcome would be a high quality technical plan enjoying widespread public understanding and…
A Technical Infrastructure to Integrate Dynamics AX ERP and CRM into University Curriculum
ERIC Educational Resources Information Center
Wimmer, Hayden; Hall, Kenneth
2016-01-01
Enterprise Resource Planning and Customer Relationship Management are becoming important topics at the university level, and are increasingly receiving course-level attention in the curriculum. In fact, the Information Systems Body of Knowledge specifically identifies Enterprise Architecture as an Information Systems-specific knowledge area. The…
NASA Technical Reports Server (NTRS)
Gavin, Thomas R.
2006-01-01
This viewgraph presentation reviews the many parts of the JPL mission planning process that the project manager has to work with. Some of them are: NASA & JPL's institutional requirements, the mission systems design requirements, the science interactions, the technical interactions, financial requirements, verification and validation, safety and mission assurance, and independent assessment, review and reporting.
78 FR 24730 - New England Fishery Management Council (NEFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... the exclusive economic zone (EEZ). Recommendations from this group will be brought to the full Council... additional information provided to it by the Council's Monkfish Plan Development Team. The Committee also will review the approach used by the Council's Groundfish Closed Area Technical Team to spatially...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... SECURITIES AND EXCHANGE COMMISSION 17 CFR Parts 230 and 270 [Release No. 33-9503; IC-30845...; Applications Regarding Joint Enterprises or Arrangements and Certain Profit-Sharing Plans AGENCY: Securities and Exchange Commission. ACTION: Final rule; technical amendments. SUMMARY: The Securities and...
Strategies for monitoring terrestrial animals and habitats
Richard Holthausen; Raymond L. Czaplewski; Don DeLorenzo; Greg Hayward; Winifred B. Kessler; Pat Manley; Kevin S. McKelvey; Douglas S. Powell; Leonard F. Ruggiero; Michael K. Schwartz; Bea Van Horne; Christina D. Vojta
2005-01-01
This General Technical Report (GTR) addresses monitoring strategies for terrestrial animals and habitats. It focuses on monitoring associated with National Forest Management Act planning and is intended to apply primarily to monitoring efforts that are broader than individual National Forests. Primary topics covered in the GTR are monitoring requirements; ongoing...
The Chancellor's Biennial Report: Two Years of Progress, 1983-85.
ERIC Educational Resources Information Center
Alabama State Dept. of Postsecondary Education, Montgomery.
This report summarizes the activities and accomplishments of Alabama's community, junior, and technical college system for 1983 to 1985. Following an introduction by the chancellor, Charles L. Payne, the report highlights major achievements in the following areas: (1) strategic planning and management, covering activities related to critical…
75 FR 54857 - Meeting of the Chief of Naval Operations Executive Panel
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... Operations (CNO) Executive Panel will deliberate on the findings and proposed recommendations of the... Navy strategy, plans, and policies regarding the utilization of technically diverse systems, primarily associated with information management systems. DATES: The meeting will be held on September 30, 2010, from 9...
Report on the "Proposed Library Reorganization".
ERIC Educational Resources Information Center
Lowry, Charles; And Others
A proposed reorganization plan for the J. Murrey Atkins Library of the University of North Carolina at Charlotte would organize the library in the collegial mold with two departments, Public Services and Technical Services. Within each department, librarians would form a faculty with emphasis on participatory management. Decisions involving the…
Zhao, Linping; Patel, Pravin K; Cohen, Mimis
2012-07-01
Computer aided design and manufacturing (CAD/CAM) technology today is the standard in manufacturing industry. The application of the CAD/CAM technology, together with the emerging 3D medical images based virtual surgical planning (VSP) technology, to craniomaxillofacial reconstruction has been gaining increasing attention to reconstructive surgeons. This article illustrates the components, system and clinical management of the VSP and CAD/CAM technology including: data acquisition, virtual surgical and treatment planning, individual implant design and fabrication, and outcome assessment. It focuses primarily on the technical aspects of the VSP and CAD/CAM system to improve the predictability of the planning and outcome.
Ghazali, Daniel Aiham; Ragot, Stéphanie; Breque, Cyril; Guechi, Youcef; Boureau-Voultoury, Amélie; Petitpas, Franck; Oriot, Denis
2016-03-25
Human error and system failures continue to play a substantial role in adverse outcomes in healthcare. Simulation improves management of patients in critical condition, especially if it is undertaken by a multidisciplinary team. It covers technical skills (technical and therapeutic procedures) and non-technical skills, known as Crisis Resource Management. The relationship between stress and performance is theoretically described by the Yerkes-Dodson law as an inverted U-shaped curve. Performance is very low for a low level of stress and increases with an increased level of stress, up to a point, after which performance decreases and becomes severely impaired. The objectives of this randomized trial are to study the effect of stress on performance and the effect of repeated simulation sessions on performance and stress. This study is a single-center, investigator-initiated randomized controlled trial including 48 participants distributed in 12 multidisciplinary teams. Each team is made up of 4 persons: an emergency physician, a resident, a nurse, and an ambulance driver who usually constitute a French Emergency Medical Service team. Six multidisciplinary teams are planning to undergo 9 simulation sessions over 1 year (experimental group), and 6 multidisciplinary teams are planning to undergo 3 simulation sessions over 1 year (control group). Evidence of the existence of stress will be assessed according to 3 criteria: biological, electrophysiological, and psychological stress. The impact of stress on overall team performance, technical procedure and teamwork will be evaluated. Participant self-assessment of the perceived impact of simulations on clinical practice will be collected. Detection of post-traumatic stress disorder will be performed by self-assessment questionnaire on the 7(th) day and after 1 month. We will concomitantly evaluate technical and non-technical performance, and the impact of stress on both. This is the first randomized trial studying repetition of simulation sessions and its impact on both clinical performance and stress, which is explored by objective and subjective assessments. We expect that stress decreases team performance and that repeated simulation will increase it. We expect no variation of stress parameters regardless of the level of performance. ClinicalTrials.gov registration number NCT02424890.
Management Overview of System Technical Support Plan for the FIREFINDER System Support Center.
1980-08-06
34.. /b , UNCLASSIFIED SECU ITY CLASSIFICATION OF THIS PAGE (When Data Entered) READ INSTRUCTIONSREPORT DOCUMENTATION PAGE BEFORE COMPLETING FORM I. REPORT...Evaluation Agency USASA U.S. Army Security Agency UTM Universal Transverse Mercator V Volts V&V Verification and Validation VCSA Vice-Chief of Staff, Army VDD... classification , configuration audits, and so forth. INSTR 5010.27 Management of Automatic Data System 9 November 1971 Development Establishes uniform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green,T.
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policymore » for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.« less
NASA Technical Standards Program
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)
2002-01-01
The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.
NASA Technical Standards Program
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, WIlliam W.
2003-01-01
The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.
Category mistakes: A barrier to effective environmental management.
Wallace, Ken J; Jago, Mark
2017-09-01
How entities, the things that exist, are defined and categorised affects all aspects of environmental management including technical descriptions, quantitative analyses, participatory processes, planning, and decisions. Consequently, ambiguous definitions and wrongly assigning entities to categories, referred to as category mistakes, are barriers to effective management. Confusion caused by treating the term 'biodiversity' variously as the property of an area, the biota of an area, and a preferred end state (a value) - quite different categories of entities - is one example. To overcome such difficulties, we develop and define four entity categories - elements, processes, properties, and values - and two derived categories - states and systems. We argue that adoption of these categories and definitions will significantly improve environmental communication and analysis, and thus strengthen planning and decision-making. Copyright © 2017 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chevallier, J.J.; Quetier, F.P.; Marshall, D.W.
Sedco Forex has developed an integrated computer system to enhance the technical performance of the company at various operational levels and to increase the understanding and knowledge of the drill crews. This paper describes the system and how it is used for recording and processing drilling data at the rig site, for associated technical analyses, and for well design, planning, and drilling performance studies at the operational centers. Some capabilities related to the statistical analysis of the company's operational records are also described, and future development of rig computing systems for drilling applications and management tasks is discussed.
Agha, Sohail; Do, Mai
2009-04-01
To compare the quality of family planning services delivered at public and private facilities in Kenya. Data from the 2004 Kenya Service Provision Assessment were analysed. The Kenya Service Provision Assessment is a representative sample of health facilities in the public and private sectors, and comprises data obtained from a facility inventory, service provider interviews, observations of client-provider interactions and exit interviews. Quality-of-care indicators are compared between the public and private sectors along three dimensions: structure, process and outcome. Private facilities were superior to public sector facilities in terms of physical infrastructure and the availability of services. Public sector facilities were more likely to have management systems in place. There was no difference between public and private providers in the technical quality of care provided. Private providers were better at managing interpersonal aspects of care. The higher level of client satisfaction at private facilities could not be explained by differences between public and private facilities in structural and process aspects of care. Formal private sector facilities providing family planning services exhibit greater readiness to provide services and greater attention to client needs than public sector facilities in Kenya. Consistent with this, client satisfaction is much higher at private facilities. Technical quality of care provided is similar in public and private facilities.
Why some family planning program fail.
1976-04-01
40 experts representing Nepal, Malaysia, Thailand, Singapore, Korea, and the Philippines participated in a 3-day workshop in Manila in March 1976 for the purpose of discussing and proposing ways of dealing with the financial problems confronting the population programs of the individual countries. The Inter-Governmental Coordinating Committee for Southeast Asia Family/Population Planning sponsored the workshop. The recommendations made at the meeting were: 1) standardization of financing reporting procedures by the region's country programs on family planning; 2) closer coordination between donor agencies and policy-making bodies of country programs in the disbursement of funds; 3) frequent exchanges of experiences, ideas, technicaL knowledge, and other matters pertaining to the financial management of such programs; and 4) inclusion of applicable financial management topics in the training of clinical staffs and those involved in follow-up operations. Additionally, a proposal was made that national population organizations or committees develop research and evaluation units. Workshop discussion sessions focused on financial planning and management, accounting and disbursement of funds, use and control of foreign aid, cost of effectiveness and benefit analysis, and financial reporting.
Earned Value Management (EVM) Implementation Handbook
NASA Technical Reports Server (NTRS)
2013-01-01
The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.
Earned Value Management (EVM) Implementation Handbook
NASA Technical Reports Server (NTRS)
Terrell, Stefanie M.; Richards, Brad W.
2018-01-01
The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.
Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less
The Database Business: Managing Today--Planning for Tomorrow. Optimizing Human Resource Factors.
ERIC Educational Resources Information Center
Clark, Joseph E.; And Others
1988-01-01
The first paper describes the National Technical Information Service productivity improvement system and its emphasis on human resources development. The second addresses the benefits of telecommuting to employers and employees. The third discusses the problems generated by the baby boom work force pressing for advancement at a time when many…
NASA Technical Reports Server (NTRS)
1980-01-01
The planning and implementation of activities associated with lead center management role and the technical accomplishments pertaining to high temperature thermal energy storage subsystems are described. Major elements reported are: (1) program definition and assessment; (2) research and technology development; (3) industrial storage applications; (4) solar thermal power storage applications; and (5) building heating and cooling applications.
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
75 FR 62759 - Notice of Proposed Change to Section IV of the Virginia State Technical Guide
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-13
... following practice standards: 314, Brush Management, 324, Deep Tillage, 330, Contour Farming, 332, Contour.... These practices will be used to plan and install conservation practices. DATES: Comments will be...-1737. Copies of the practice standards will be made available upon written request to the address shown...
ERIC Educational Resources Information Center
Woodward, Belle S.; Sendall, Patricia; Ceccucci, Wendy
2010-01-01
Contemporary Information Systems graduates will be more marketable in the workplace upon graduation if they have combined competencies in both technical and soft skills: interpersonal communication, teamwork, time management, planning and organizational skills. Team and project-based learning can be used to incorporate soft skill competencies with…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less
CDC Support for Global Public Health Emergency Management.
Brencic, Daniel J; Pinto, Meredith; Gill, Adrienne; Kinzer, Michael H; Hernandez, Luis; Pasi, Omer G
2017-12-01
Recent pandemics and rapidly spreading outbreaks of infectious diseases have illustrated the interconnectedness of the world and the importance of improving the international community's ability to effectively respond. The Centers for Disease Control and Prevention (CDC), building on a strong foundation of lessons learned through previous emergencies, international recognition, and human and technical expertise, has aspired to support nations around the world to strengthen their public health emergency management (PHEM) capacity. PHEM principles streamline coordination and collaboration in responding to infectious disease outbreaks, which align with the core capacities outlined in the International Health Regulations 2005. CDC supports PHEM by providing in-country technical assistance, aiding the development of plans and procedures, and providing fellowship opportunities for public health emergency managers. To this end, CDC partners with US agencies, international partners, and multilateral organizations to support nations around the world to reduce illness and death from outbreaks of infectious diseases.
CIM's bridge from CADD to CAM: Data management requirements for manufacturing engineering
NASA Technical Reports Server (NTRS)
Ford, S. J.
1984-01-01
Manufacturing engineering represents the crossroads of technical data management in a Computer Integrated Manufacturing (CIM) environment. Process planning, numerical control programming and tool design are the key functions which translate information from as engineered to as assembled. In order to transition data from engineering to manufacturing, it is necessary to introduce a series of product interpretations which contain an interim introduction of technical parameters. The current automation of the product definition and the production process places manufacturing engineering in the center of CAD/CAM with the responsibility of communicating design data to the factory floor via a manufacturing model of the data. A close look at data management requirements for manufacturing engineering is necessary in order to establish the overall specifications for CADD output, CAM input, and CIM integration. The functions and issues associated with the orderly evolution of computer aided engineering and manufacturing are examined.
Sousa, V; Matos, J P; Almeida, N; Saldanha Matos, J
2014-01-01
Operation, maintenance and rehabilitation comprise the main concerns of wastewater infrastructure asset management. Given the nature of the service provided by a wastewater system and the characteristics of the supporting infrastructure, technical issues are relevant to support asset management decisions. In particular, in densely urbanized areas served by large, complex and aging sewer networks, the sustainability of the infrastructures largely depends on the implementation of an efficient asset management system. The efficiency of such a system may be enhanced with technical decision support tools. This paper describes the role of artificial intelligence tools such as artificial neural networks and support vector machines for assisting the planning of operation and maintenance activities of wastewater infrastructures. A case study of the application of this type of tool to the wastewater infrastructures of Sistema de Saneamento da Costa do Estoril is presented.
Programming of Urban Revitalization
NASA Astrophysics Data System (ADS)
Biliński, Tadeusz
2016-12-01
The planning stage of the investment-construction process is of a crucial importance. Its overall impact on the costs, construction time and the quality of design solutions is huge. However, in practice, little attention is given to this pre-design stage, except for public buildings or other buildings of particular importance. In consequence, the results of investment and construction activities are unsatisfactory. Therefore, the issue has been given careful consideration in this paper. The paper discusses the issue of programming urban revitalization, emphasizing its socio-economic importance. To illustrate the complexity of revitalization projects planning, the author draws attention to social, economic, technical and organisational factors, such as public participation, reorganization and revaluation of land use planning, rationalization of energy use, organization and management of revitalization processes, as well as technical progress. Summarising the paper, the author concludes that in order to improve the quality of life of town residents and to protect material national heritage, it is indispensable to continuously revitalize subsequent town areas.
Hefelfinger, Jenny; Patty, Alice; Ussery, Ann
2013-01-01
Introduction This study assessed the value of technical assistance provided by state health department expert advisors and by the staff of the National Association of Chronic Disease Directors (NACDD) to community groups that participated in the Action Communities for Health, Innovation, and Environmental Change (ACHIEVE) Program, a CDC-funded health promotion program. Methods We analyzed quantitative and qualitative data reported by community project coordinators to assess the nature and value of technical assistance provided by expert advisors and NACDD staff and the usefulness of ACHIEVE resources in the development and implementation of community action plans. A grounded theory approach was used to analyze and categorize phrases in text data provided by community coordinators. Open coding placed conceptual labels on text phrases. Frequency distributions of the quantitative data are described and discussed. Results The most valuable technical assistance and program support resources were those determined to be in the interpersonal domain (ie, interactions with state expert advisors, NACDD staff, and peer-to-peer support). The most valuable technical assistance events were action institutes, coaches’ meetings, webinars, and technical assistance conference calls. Conclusion This analysis suggests that ACHIEVE communities valued the management and training assistance provided by expert advisors and NACDD staff. State health department expert advisors provided technical guidance and support, including such skills or knowledge-based services as best-practice strategies, review and discussion of community assessment data, sustainability planning, and identification of possible funding opportunities. NACDD staff led development and implementation of technical assistance events. PMID:24157078
Towards Knowledge Management for Smart Manufacturing.
Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard
2017-09-01
The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.
SOFIA Program SE and I Lessons Learned
NASA Technical Reports Server (NTRS)
Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.
2011-01-01
Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.
Adaptive management: a paradigm for remediation of public facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B
2009-01-01
Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less
Optimal planning for the sustainable utilization of municipal solid waste.
Santibañez-Aguilar, José Ezequiel; Ponce-Ortega, José María; Betzabe González-Campos, J; Serna-González, Medardo; El-Halwagi, Mahmoud M
2013-12-01
The increasing generation of municipal solid waste (MSW) is a major problem particularly for large urban areas with insufficient landfill capacities and inefficient waste management systems. Several options associated to the supply chain for implementing a MSW management system are available, however to determine the optimal solution several technical, economic, environmental and social aspects must be considered. Therefore, this paper proposes a mathematical programming model for the optimal planning of the supply chain associated to the MSW management system to maximize the economic benefit while accounting for technical and environmental issues. The optimization model simultaneously selects the processing technologies and their location, the distribution of wastes from cities as well as the distribution of products to markets. The problem was formulated as a multi-objective mixed-integer linear programing problem to maximize the profit of the supply chain and the amount of recycled wastes, where the results are showed through Pareto curves that tradeoff economic and environmental aspects. The proposed approach is applied to a case study for the west-central part of Mexico to consider the integration of MSW from several cities to yield useful products. The results show that an integrated utilization of MSW can provide economic, environmental and social benefits. Copyright © 2013 Elsevier Ltd. All rights reserved.
Human Factors and Ergonomics for the Dental Profession.
Ross, Al
2016-09-01
This paper proposes that the science of Human Factors and Ergonomics (HFE) is suitable for wide application in dental education, training and practice to improve safety, quality and efficiency. Three areas of interest are highlighted. First it is proposed that individual and team Non-Technical Skills (NTS), such as communication, leadership and stress management can improve error rates and efficiency of procedures. Secondly, in a physically and technically challenging environment, staff can benefit from ergonomic principles which examine design in supporting safe work. Finally, examination of organizational human factors can help anticipate stressors and plan for flexible responses to multiple, variable demands, and fluctuating resources. Clinical relevance: HFE is an evidence-based approach to reducing error rates and procedural complications, and avoiding problems associated with stress and fatigue. Improved teamwork and organizational planning and efficiency can impact directly on patient outcomes.
Methods and Models of the Hanford Internal Dosimetry Program, PNNL-MA-860
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.
2009-09-30
The Hanford Internal Dosimetry Program (HIDP) provides internal dosimetry support services for operations at the Hanford Site. The HIDP is staffed and managed by the Radiation and Health Technology group, within the Pacific Northwest National Laboratory (PNNL). Operations supported by the HIDP include research and development, the decontamination and decommissioning of facilities formerly used to produce and purify plutonium, and waste management activities. Radioelements of particular interest are plutonium, uranium, americium, tritium, and the fission and activation product radionuclides 137Cs, 90Sr, and 60Co. This manual describes the technical basis for the design of the routine bioassay monitoring program and formore » assessment of internal dose. The purposes of the manual are as follows: • Provide assurance that the HIDP derives from a sound technical base. • Promote the consistency and continuity of routine program activities. • Provide a historical record. • Serve as a technical reference for radiation protection personnel. • Aid in identifying and planning for future needs.« less
Technical support plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The PassPort (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, and Purchasing. The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources, Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HAND1 2000 Project, is referred to asmore » Business Management System (BMS) and Chemical Management.« less
Spacelab: An International Success Story
NASA Technical Reports Server (NTRS)
Lord, Douglas R.
1987-01-01
Spacelab is a European-developed and U.S.-operated space laboratory carried in the cargo bay of the Space Shuttle Orbiter. This story of the Spacelab Development Program traces the program from the origin of the Spacelab concept, describing negotiations and agreements for European participation and the role of Europe and the United States in system development, operational capability development, and utilization planning. It also considers the joint management structure, coordination, and experience in solving management and technical interface problems. The book is not an exhaustive historical treatise, but an informative and readable story of the evolution and technical accomplishments of this unique program in manned space flight and of some of the unusual political and human interest aspects of the program from the viewpoint of one of the key participants.
Multiparametric prostate MRI: technical conduct, standardized report and clinical use.
Manfredi, Matteo; Mele, Fabrizio; Garrou, Diletta; Walz, Jochen; Fütterer, Jurgen J; Russo, Filippo; Vassallo, Lorenzo; Villers, Arnauld; Emberton, Mark; Valerio, Massimo
2018-02-01
Multiparametric prostate MRI (mp-MRI) is an emerging imaging modality for diagnosis, characterization, staging, and treatment planning of prostate cancer (PCa). The technique, results reporting, and its role in clinical practice have been the subject of significant development over the last decade. Although mp-MRI is not yet routinely used in the diagnostic pathway, almost all urological guidelines have emphasized the potential role of mp-MRI in several aspects of PCa management. Moreover, new MRI sequences and scanning techniques are currently under evaluation to improve the diagnostic accuracy of mp-MRI. This review presents an overview of mp-MRI, summarizing the technical applications, the standardized reporting systems used, and their current roles in various stages of PCa management. Finally, this critical review also reports the main limitations and future perspectives of the technique.
Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, J.W.
1993-12-01
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY)more » 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.« less
Advanced consequence management program: challenges and recent real-world implementations
NASA Astrophysics Data System (ADS)
Graser, Tom; Barber, K. S.; Williams, Bob; Saghir, Feras; Henry, Kurt A.
2002-08-01
The Enhanced Consequence Management, Planning and Support System (ENCOMPASS) was developed under DARPA's Advanced Consequence Management program to assist decision-makers operating in crisis situations such as terrorist attacks using conventional and unconventional weapons and natural disasters. ENCOMPASS provides the tools for first responders, incident commanders, and officials at all levels to share vital information and consequently, plan and execute a coordinated response to incidents of varying complexity and size. ENCOMPASS offers custom configuration of components with capabilities ranging from map-based situation assessment, situation-based response checklists, casualty tracking, and epidemiological surveillance. Developing and deploying such a comprehensive system posed significant challenges for DARPA program management, due to an inherently complex domain, a broad spectrum of customer sites and skill sets, an often inhospitable runtime environment, demanding development-to-deployment transition requirements, and a technically diverse and geographically distributed development team. This paper introduces ENCOMPASS and explores these challenges, followed by an outline of selected ENCOMPASS deployments, demonstrating how ENCOMPASS can enhance consequence management in a variety real world contexts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip
Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less
National Transonic Facility: A review of the operational plan
NASA Technical Reports Server (NTRS)
Liepmann, H. W.; Black, R. E.; Dietz, R. O.; Kirchner, M. E.; Sears, W. R.
1980-01-01
The proposed National Transonic Facility (NTF) operational plan is reviewed. The NTF will provide an aerodynamic test capability significantly exceeding that of other transonic regime wind tunnels now available. A limited number of academic research program that might use the NTF are suggested. It is concluded that the NTF operational plan is useful for management, technical, instrumentation, and model building techniques available in the specialized field of aerodynamic analysis and simulation. It is also suggested that NASA hold an annual conference to discuss wind tunnel research results and to report on developments that will further improve the utilization and cost effectiveness of the NTF and other wind tunnels.
Research and technology operating plan: A summary Fiscal Year 1974. [bibliography
NASA Technical Reports Server (NTRS)
1973-01-01
A compilation is presented of the summary portions of RTOPs used for management review and control of research. Citations and abstracts of RTOPs are included. A list is presented of RTOPs which have been changed, completed, or terminated since the last summary. Indexes presented include: subject, technical monitor, responsible NASA organization, and RTOP number.
This project will provide technical assistance to support implementation of GI in U.S. communities and information on best practices for GI approaches that protect ground water supplies. Case studies that can be more broadly applied to other communities will be conducted. The pro...
DOT National Transportation Integrated Search
2005-04-01
This Guidebook was developed at the request of the transit industry. It provides best practices for both transit managers and technical staff with respect to planning, implementing and using geographic data in transit. The Guidebook discusses issues ...
Accountability and the Kepler Public Schools. A Technical-Behavioral Analysis. Appendix A.
ERIC Educational Resources Information Center
Levine, Donald M.; Hahn, Peter T.
This study examines the effectiveness of an accountability system--Alter--whose aim is to facilitate long-term planning. The purpose of the study was to develop a model that school systems can use in implementing accountability systems. The project explored the idea that when formal management systems are introduced into schools, they ignore…
Evaluating the forest stewardship program through a national survey of participants
J.D. Esseks; R.J. Moulton
2000-01-01
This paper reports findings from a national survey of 1,231 participants in the Forest Stewardship Program (FSP) of USDA's Forest Service. Launched in 1991, the FSP provides technical assistance through state forestry agencies to help landowners develop management plans for their non-industrial forestland. The survey allowed us to address five main evaluative...
ERIC Educational Resources Information Center
Miller, Linda Wise; Winn, Richard
This document contains Idaho's marketing education (ME) core curriculum. Presented first are a list of 22 ME strategies that are aligned with the Idaho State Division of Vocational-Technical Education's strategic plan and a chart detailing the career pathways of ME in Idaho (arts and communication, business and management, health services, human…
This course will introduce students to the fundamental principles of water system adaptation to hydrological changes, with emphasis on data analysis and interpretation, technical planning, and computational modeling. Starting with real-world scenarios and adaptation needs, the co...
Beginning the Principalship. A Practical Guide for New School Leaders. Third Edition
ERIC Educational Resources Information Center
Daresh, John C.
2006-01-01
This new edition of John C. Daresh's bestseller provides the resources needed to become a strong and effective leader. The reader will find out have they can: (1) Manage others' expectations as principal; (2) Master the technical skills necessary to run a school; (3) Create and clarify a personal professional growth plan; (4) Work effectively…
What have we learned, and what is new in watershed science?
Robert R. Ziemer; Leslie M. Reid
1997-01-01
Abstract - Important new lessons are not in technical details, but in how to scale up the details to apply to large watersheds and landscapes. Nearly three years of experience with the Northwest Forest Plan have revealed some major new challenges in the fields of watershed science. In particular, managers and resource specialists engaged in watershed analysis...
Job Entry Level Competencies of a One Year Barber School Graduate. Final Report.
ERIC Educational Resources Information Center
Swerman, Richard A.; Wurtzel, Norbert K.
To determine the competency level required of a one-year graduate from barber school and to obtain information that would enable vocational-technical schools to plan their curriculum to better meet student barber needs, a survey was conducted in Wisconsin of 629 barber shop managers, 75 journeymen, and 200 apprentices. Picked at random, these…
ERIC Educational Resources Information Center
Marlowe, Edward; And Others
This is the fourth report in a series which describes the results and progress in a long-term program to develop a Data Management System (DMS) and a Student Management System (SMS) for use in the Naval Student Pilot Training System. The DMS will contain all of the student naval aviator's data files needed to support an improved student training…
NASA Technical Reports Server (NTRS)
Tompkins, F. G.
1984-01-01
Guidance is presented to NASA Computer Security Officials for determining the acceptability or unacceptability of ADP security risks based on the technical, operational and economic feasibility of potential safeguards. The risk management process is reviewed as a specialized application of the systems approach to problem solving and information systems analysis and design. Reporting the results of the risk reduction analysis to management is considered. Report formats for the risk reduction study are provided.
Starkl, Markus; Brunner, Norbert; López, Eduardo; Martínez-Ruiz, José Luis
2013-12-15
DPSIR and the three-pillar model are well-established frameworks for sustainability assessment. This paper proposes a planning-oriented sustainability assessment framework (POSAF). It is informed by those frameworks but differs insofar as it puts more emphasis on a constructivist conception which recognises that sustainability needs to be defined anew for each planning problem. In finding such a consensus definition, POSAF uses participatory scenario analysis and participatory planning, technical feasibility study, participatory assessment, analysis of trade-offs and social networks in an unusual combination and for goals that differ from the original conceptions of these methods. POSAF was applied in a peri-urban area of Mexico City for the design of improved water service provision, integrating solid waste management. It supported consensus amongst users about the importance of environmental issues, informed planners about the values of stakeholders and users, detected local differences, and identified possible conflicts at an early stage of decision-making. Copyright © 2013 Elsevier Ltd. All rights reserved.
Fernández, Marcela T; Gómez, Adrián R; Santojanni, Américo M; Cancio, Alfredo H; Luna, Daniel R; Benítez, Sonia E
2015-01-01
Electronic Health Record system downtimes may have a great impact on patient care continuity. This paper describes the analysis and actions taken to redesign the Contingency Plan Procedure for the Electronic Health Record System of Hospital Italiano de Buenos Aires. After conducting a thorough analysis of the data gathered at post-contingency meetings, weaknesses were identified in the procedure; thus, strategic actions were recommended to redesign the Contingency Plan to secure an effective communications channel, as well as a formal structure for functions that may support the decision-making process. The main actions were: 1) to incorporate the IT Contingencies Committee (Plan management); 2) to incorporate the Coordinator (general supervision of the procedure); and 3) to redefine the role of the Clinical Informatics Resident, who will be responsible for managing communication between the technical team and Electronic Health Record users. As users need the information for continuity of care, key users evaluated the impact of the new strategy with an adapted survey.
Disaster recovery plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support formore » the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.« less
Huamán-Angulo, Lizardo; Liendo-Lucano, Lindaura; Nuñez-Vergara, Manuel
2011-06-01
Human resources are the backbone of health sector actions; however, they are not necessarily the area with the greatest attention, therefore, the Ministry of Health of Peru (MINSA) together with regional governments, led the Decentralized and Agreed Sector Plan for the Capacity Development in Health 2010-2014 (PLANSALUD) with the aim of strengthening the capacities of Human Resources for Health (HRH) and contribute to health care efficient development, quality, relevance, equity and multiculturalism, in the context of descentralization, the Universal Health Insurance (AUS) and health policies. To achieve this goal, they have proposed three components (technical assistance, joint training and education - health articulation) that bring together an important set of interventions, which are planned and defined according to the national, regional and local levels, thus contributing to improve the government capacity, capability management and delivery of health services. This paper presents a first approach of PLANSALUD, including aspects related to planning, management, financing, structure and functioning, as well as monitoring and evaluation measures.
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Sankey, Joel B.; Yackulic, Charles B.; Schmidt, John C.
2017-01-18
IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and provides technical advice to the AMWG. It is composed of technical and science representatives from the same agencies and stakeholder groups who serve on the AMWG. GCMRC is the primary science provider to the GCDAMP and also coordinates many aspects of the science performed by cooperators and partner agencies. The Science Advisors Program provides independent science reviews and advice at the request of the GCDAMP.The plan proposed here necessarily depends on (1) the protocol for decision-making and the requirements for scientific data reporting described in the LTEMP ROD, (2) the priorities of the GCDAMP as directed by the LTEMP ROD (see Department of the Interior, 2016b, section 6.1), (3) the priorities for monitoring and research in the conservation measures section of the Biological Opinion for the LTEMP (U.S. Department of the Interior, 2016b, LTEMP ROD attachment E), (4) the priorities for resource management and information needs established by Federal and State resource-management agencies within the GCDAMP, (5) scientific understanding about the linkage between the status of those resources and operations of Glen Canyon Dam, and (6) the need to resolve existing scientific uncertainties about the linkage between dam operations and the condition of resources. We note that resource-management prioritization is fundamentally a policy decision charged specifically to DOI for the Colorado River in Glen and Grand Canyons, as outlined most recently in the LTEMP ROD, and is not the responsibility of the GCMRC. However, it is the responsibility of the GCMRC to describe the nature of scientific understanding, the nature of scientific uncertainty, and the risk of making resourcemanagement decisions in the face of existing scientific uncertainty. The goals of science activities in the next 20 years are to inform operational decisions regarding Glen Canyon Dam operations described in the LTEMP ROD, resolve remaining scientific uncertainties, and to monitor resource trends that are affected entirely, or in part, by dam operations.
External Tank Program Legacy of Success
NASA Technical Reports Server (NTRS)
Welzyn, Ken; Pilet, Jeff
2010-01-01
I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda Shaller; Willoughby, John K.
1991-01-01
Traditional practice of systems engineering management assumes requirements can be precisely determined and unambiguously defined prior to system design and implementation; practice further assumes requirements are held static during implementation. Human-computer decision support systems for service planning and scheduling applications do not conform well to these assumptions. Adaptation to the traditional practice of systems engineering management are required. Basic technology exists to support these adaptations. Additional innovations must be encouraged and nutured. Continued partnership between the programmatic and technical perspective assures proper balance of the impossible with the possible. Past problems have the following origins: not recognizing the unusual and perverse nature of the requirements for planning and scheduling; not recognizing the best starting point assumptions for the design; not understanding the type of system that being built; and not understanding the design consequences of the operations concept selected.
Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
Actionable Science in the Gulf of Mexico: Connecting Researchers and Resource Managers
NASA Astrophysics Data System (ADS)
Lartigue, J.; Parker, F.; Allee, R.; Young, C.
2017-12-01
The National Oceanic and Atmospheric Administration (NOAA) RESTORE Science Program was established in the wake of the Deepwater Horizon oil spill to to carry out research, observation, and monitoring to support the long-term sustainability of the Gulf of Mexico ecosystem, including its fisheries. Administered in partnership with the US Fish and Wildlife Service, the Science Program emphasizes a connection between science and decision-making. This emphasis translated into an engagement process that allowed for resource managers and other users of information about the ecosystem to provide direct input into the science plan for the program. In developing funding opportunities, the Science Program uses structured conversations with resource managers and other decision makers to focus competitions on specific end user needs. When evaluating proposals for funding, the Science Program uses criteria that focus on applicability of a project's findings and products, end user involvement in project planning, and the approach for transferring findings and products to the end user. By including resource managers alongside scientific experts on its review panels, the Science Program ensures that these criteria are assessed from both the researcher and end user perspectives. Once funding decisions are made, the Science Program assigns a technical monitor to each award to assist with identifying and engaging end users. Sharing of best practices among the technical monitors has provided the Science Program insight on how best to bridge the gap between research and resource management and how to build successful scientist-decision maker partnerships. During the presentation, we will share two case studies: 1) design of a cooperative (fisheries scientist, fisheries managers, and fishers), Gulf-wide conservation and monitoring program for fish spawning aggregations and 2) development of habitat-specific ecosystem indicators for use by federal and state resource managers.
Flat-plate solar array project. Volume 8: Project analysis and integration
NASA Technical Reports Server (NTRS)
Mcguire, P.; Henry, P.
1986-01-01
Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.
NASA Astrophysics Data System (ADS)
Rice, J. L.; Woodhouse, C.; Lukas, J.
2008-12-01
Current climate variability, potential impacts of climate change, and limited resources in the face of growing demand are increasingly prompting water managers in the western United States to consider and use data from climate-related research in water resource planning. Much of these data are produced by stakeholder- driven science programs, such as NOAA's Regional Integrated Science Assessments (RISAs), but there have been few efforts to evaluate the effectiveness of these science-to-application efforts. Over the past several years, researchers with the Western Water Assessment (WWA) RISA have been providing tree-ring reconstructions of streamflow to water managers in Colorado and other western states, and presenting technical workshops explaining the applications of these tree-ring data for water management and planning. Using in-depth interviews and a survey questionnaire, we have assessed the effectiveness and outcomes of these engagements, addressing (1) the factors that have prompted water managers to seek out tree-ring data, (2) how paleoclimate data has been made relevant and accessible for water resource planning, and (3) how tree-ring data and information have been utilized by water managers and other workshop participants. We also provide an assessment of challenges and opportunities that exist in the translation of climate science for decision-making, including how tree-ring data are interpreted in the context of water planning paradigms, issues of credibility and acceptance of tree ring data, and what data needs exist in different planning environments. These findings have broader application in improving and evaluating science-policy interactions related to climate and climate change.
Mapping the global health employment market: an analysis of global health jobs.
Keralis, Jessica M; Riggin-Pathak, Brianne L; Majeski, Theresa; Pathak, Bogdan A; Foggia, Janine; Cullinen, Kathleen M; Rajagopal, Abbhirami; West, Heidi S
2018-02-27
The number of university global health training programs has grown in recent years. However, there is little research on the needs of the global health profession. We therefore set out to characterize the global health employment market by analyzing global health job vacancies. We collected data from advertised, paid positions posted to web-based job boards, email listservs, and global health organization websites from November 2015 to May 2016. Data on requirements for education, language proficiency, technical expertise, physical location, and experience level were analyzed for all vacancies. Descriptive statistics were calculated for the aforementioned job characteristics. Associations between technical specialty area and requirements for non-English language proficiency and overseas experience were calculated using Chi-square statistics. A qualitative thematic analysis was performed on a subset of vacancies. We analyzed the data from 1007 global health job vacancies from 127 employers. Among private and non-profit sector vacancies, 40% (n = 354) were for technical or subject matter experts, 20% (n = 177) for program directors, and 16% (n = 139) for managers, compared to 9.8% (n = 87) for entry-level and 13.6% (n = 120) for mid-level positions. The most common technical focus area was program or project management, followed by HIV/AIDS and quantitative analysis. Thematic analysis demonstrated a common emphasis on program operations, relations, design and planning, communication, and management. Our analysis shows a demand for candidates with several years of experience with global health programs, particularly program managers/directors and technical experts, with very few entry-level positions accessible to recent graduates of global health training programs. It is unlikely that global health training programs equip graduates to be competitive for the majority of positions that are currently available in this field.
Research on large equipment maintenance system in life cycle
NASA Astrophysics Data System (ADS)
Xu, Xiaowei; Wang, Hongxia; Liu, Zhenxing; Zhang, Nan
2017-06-01
In order to change the current disadvantages of traditional large equipment maintenance concept, this article plans to apply the technical method of prognostics and health management to optimize equipment maintenance strategy and develop large equipment maintenance system. Combined with the maintenance procedures of various phases in life cycle, it concluded the formulation methods of maintenance program and implement plans of maintenance work. In the meantime, it takes account into the example of the dredger power system of the Waterway Bureau to establish the auxiliary platform of ship maintenance system in life cycle.
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-12-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
NASA Astrophysics Data System (ADS)
Goldberg, G.; McClintock, W.
2016-02-01
Effective interagency and cross-sector coordination is essential to ecosystem based management which depends on processes characterized by collaboration and science-based information. Many technological barriers that exist in the development of science-based management plans are closely tied to process challenges, such as the sharing of data and information or the inclusion of parties with varied levels of technical experience. The Channel Islands National Marine Sanctuary has convened a diverse working group to develop recommendations for the management of marine shipping in and around the Santa Barbara Channel, as well as recommendations regarding research needs and outreach strategies. Working group members take a multi-issue approach with four distinct goals related to the reduction of ship strikes on whales, emissions and air quality, conflicting ocean uses, and issues of navigational safety. Members range from industry representatives, scientists, and multiple local and federal government entities. The recommended management plans will be based in the best-available science, and will build off of previous efforts, making this an interesting case study of adaptive management. In addition to support from the Sanctuary and professional facilitators, the group is using a decision-support platform, SeaSketch (safepassage.seasketch.org). SeaSketch is a web-based GIS that supports collaborative science-based marine spatial planning (MSP). Each feature supports a step of the MSP process, from data gathering, identification of data needs, the design of spatial plans, evaluation of those plans with analytics, and map-based forums that facilitate data-driven discussions. Working group members are able to access these tools to explore management options and collaborate remotely, in addition to using the platform during in-person meetings and webinars. Empowering diverse audiences to engage in the design of science-based plans is of key importance to developing ecosystem-based management plans where multi-sector participation and inter-agency coordination are critical.
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
A Methodology to Support Decision Making in Flood Plan Mitigation
NASA Astrophysics Data System (ADS)
Biscarini, C.; di Francesco, S.; Manciola, P.
2009-04-01
The focus of the present document is on specific decision-making aspects of flood risk analysis. A flood is the result of runoff from rainfall in quantities too great to be confined in the low-water channels of streams. Little can be done to prevent a major flood, but we may be able to minimize damage within the flood plain of the river. This broad definition encompasses many possible mitigation measures. Floodplain management considers the integrated view of all engineering, nonstructural, and administrative measures for managing (minimizing) losses due to flooding on a comprehensive scale. The structural measures are the flood-control facilities designed according to flood characteristics and they include reservoirs, diversions, levees or dikes, and channel modifications. Flood-control measures that modify the damage susceptibility of floodplains are usually referred to as nonstructural measures and may require minor engineering works. On the other hand, those measures designed to modify the damage potential of permanent facilities are called non-structural and allow reducing potential damage during a flood event. Technical information is required to support the tasks of problem definition, plan formulation, and plan evaluation. The specific information needed and the related level of detail are dependent on the nature of the problem, the potential solutions, and the sensitivity of the findings to the basic information. Actions performed to set up and lay out the study are preliminary to the detailed analysis. They include: defining the study scope and detail, the field data collection, a review of previous studies and reports, and the assembly of needed maps and surveys. Risk analysis can be viewed as having many components: risk assessment, risk communication and risk management. Risk assessment comprises an analysis of the technical aspects of the problem, risk communication deals with conveying the information and risk management involves the decision process. In the present paper we propose a novel methodology for supporting the priority setting in the assessment of such issues, beyond the typical "expected value" approach. Scientific contribution and management aspects are merged to create a simplified method for plan basin implementation, based on risk and economic analyses. However, the economic evaluation is not the sole criterion for flood-damage reduction plan selection. Among the different criteria that are relevant to the decision process, safety and quality of human life, economic damage, expenses related with the chosen measures and environmental issues should play a fundamental role on the decisions made by the authorities. Some numerical indices, taking in account administrative, technical, economical and risk aspects, are defined and are combined together in a mathematical formula that defines a Priority Index (PI). In particular, the priority index defines a ranking of priority interventions, thus allowing the formulation of the investment plan. The research is mainly focused on the technical factors of risk assessment, providing quantitative and qualitative estimates of possible alternatives, containing measures of the risk associated with those alternatives. Moreover, the issues of risk management are analyzed, in particular with respect to the role of decision making in the presence of risk information. However, a great effort is devoted to make this index easy to be formulated and effective to allow a clear and transparent comparison between the alternatives. Summarizing this document describes a major- steps for incorporation of risk analysis into the decision making process: framing of the problem in terms of risk analysis, application of appropriate tools and techniques to obtain quantified results, use of the quantified results in the choice of structural and non-structural measures. In order to prove the reliability of the proposed methodology and to show how risk-based information can be incorporated into a flood analysis process, its application to some middle italy river basins is presented. The methodology assessment is performed by comparing different scenarios and showing that the optimal decision stems from a feasibility evaluation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garnett, Kenisha, E-mail: k.garnett@cranfield.ac.uk; Cooper, Tim, E-mail: t.h.cooper@ntu.ac.uk
2014-12-15
Highlights: • A review of public engagement in waste management decision-making is undertaken. • Enhanced public engagement is explored as a means to legitimise waste decisions. • Analytical–deliberative processes are explored as a tool for effective dialogue. • Considerations for integrating public values with technical analysis are outlined. • Insights into the design of appropriate public engagement processes are provided. - Abstract: The complexity of municipal waste management decision-making has increased in recent years, accompanied by growing scrutiny from stakeholders, including local communities. This complexity reflects a socio-technical framing of the risks and social impacts associated with selecting technologies andmore » sites for waste treatment and disposal facilities. Consequently there is growing pressure on local authorities for stakeholders (including communities) to be given an early opportunity to shape local waste policy in order to encourage swift planning, development and acceptance of the technologies needed to meet statutory targets to divert waste from landfill. This paper presents findings from a research project that explored the use of analytical–deliberative processes as a legitimising tool for waste management decision-making. Adopting a mixed methods approach, the study revealed that communicating the practical benefits of more inclusive forms of engagement is proving difficult even though planning and policy delays are hindering development and implementation of waste management infrastructure. Adopting analytical–deliberative processes at a more strategic level will require local authorities and practitioners to demonstrate how expert-citizen deliberations may foster progress in resolving controversial issues, through change in individuals, communities and institutions. The findings suggest that a significant shift in culture will be necessary for local authorities to realise the potential of more inclusive decision processes. This calls for political actors and civic society to collaborate in institutionalising public involvement in both strategic and local planning structures.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Munasinghe, M.; Meier, P.
1988-01-01
Given the importance of energy in modern economies, the first part of the volume is devoted to examining some of the key conceptual and analytical tools available for energy-policy analysis and planning. Policy tools and institutional frameworks that will facilitate better energy management are also discussed. Energy-policy analysis is explained, while effective energy management techniques are discussed to achieve desirable national objectives, using a selected set of policies and policy instruments. In the second part of the volume, the actual application of the principles set out earlier is explained through a case study of Sri Lanka. The monograph integrates themore » many aspects of the short-term programs already begun with the options for the medium to long term, and ends with the outline of a long-term strategy for Sri Lanka.« less
Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective
NASA Astrophysics Data System (ADS)
Subramanyam, K.; Haridharan, M. K.
2017-07-01
Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.
NASA Astrophysics Data System (ADS)
Frigerio, Simone; Sterlacchini, Simone; Malet, Jean-Philippe; Glade, Thomas
2010-05-01
PETer (Protection and Emergency of the Territory) has been developed since 2006 as a tool to manage all the information available to perform a wide range of Civil Protection activities. Based on MapObjects spatial support, it was relied on capacity to manage data from different sources and at different scale, offering practical GIS-tools for a technical and practical use during crisis state. At the first stages of the development, after different assessment, critical on-field analysis and a direct proof on test area, the approach came into sight like a valid database management for the entire dataset, but quite static, not full-blown for every emergency necessity, too complicate and not enough user-friendly, considering people in charge during emergency management, the quick change of state with many parameters involved and also uncertainty, hesitation, confusion or general panic among decision makers. As a second step of research, a more down-to-earth methodology targeted to cope with the aftermath of critical events is presented here. It takes advantage of Geographical Information Systems (GIS), Decision Support Systems (DSS), and Information and Communication Technology (ICT) to prepare, apply and coordinate Civil Protection plans. The main aim was to set up and manage contingency plans in advance; that is, to identify and prepare people in charge to take action to define the activities to be performed, to be aware of available resources and to optimize the communication system among the people involved, in order to efficiently face a prospective crisis phase. A disaster preparedness plan should anticipate the demands for a disaster relief operation and indicate the most effective way of joining those requirements. Through scientific and technical co-operation between public and private research groups, a new platform was planned and set up, in order to test the aims of the project. The application was based on a cooperative organizational structure by which information was managed at different levels, linking all people in decision-making roles: crews in the field, the mobile command post and the control room. The tool automatically performs organizational and operational activities within a Civil Protection plan, in line with enforceable regulations. It couples: data processing capabilities by GIS; workflow management modules by DSS and communication systems by the ICT. More specifically, the work presents the overall concept and the system architecture of a generic decision-support system in progress of development, displaying the aims of emergency management and then shows a DSS first of all for Civil Protection Plan within Disaster Preparedness and Response framework in a Consortium of Mountain Municipalities (Valtellina di Tirano, Central Alps, Northern Italy). A multi-area approach (involving the management of disaster scenarios at the La Valette landslide in the Barcelonnette Basin, South French Alps) has been introduced to calibrate the platform, to compare available dataset, information details, laws in force in different countries, stakeholders' responsibility and end-users' background. Work in progress involves multi-task tools useful in emergency situation, to enforce open-communication devices (SMS automatic platform, SKYPE interface, visual video), integrate existing monitoring system and web-service to tailor open-sharing information with emergency management demand.
de Castro, Mara Antonio Monteiro; Poi, Wilson Roberto; de Castro, José Carlos Monteiro; Panzarini, Sônia Regina; Sonoda, Celso Koogi; Trevisan, Carolina Lunardelli; Luvizuto, Eloá Rodrigues
2010-06-01
Traumatic tooth injuries involve function and aesthetics and cause damage that range from minimal enamel loss to complex fractures involving the pulp tissue and even loss of the tooth crown. Technical knowledge and clinical experience are essential to establish an accurate diagnosis and provide a rational treatment. The purpose of this study was to evaluate the knowledge of Restorative Dentistry specialists about the management of crown and crown-root fractures based on treatment plans proposed by these professionals for these cases. A descriptive questionnaire was mailed to 245 Restorative Dentistry specialists with questions referring to their professional profile and the treatment plans they would propose for the management of crown and crow-root fractures resulting from dental trauma. One hundred and fifty-four questionnaires were returned properly filled. The data were subjected to descriptive statistics and the chi-square test was used to determine the frequency and the level of the significance among the variables. The analysis of data showed that in spite of having a specialist title, all interviewees had great difficulty in planning the treatments. As much as 42.8% of the participants were unable to treat all types of dental trauma. Complicated and uncomplicated crown-root fractures posed the greatest difficulties for the dentists to establish adequate treatment plans because these fractures require multidisciplinary knowledge and approach for a correct case planning and prognosis.
NASA Astrophysics Data System (ADS)
Osland, Anna Christine
Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable groups within the hazard area. Interestingly, development closer to pipelines was newer than areas farther away, illustrating the failure of land-use planning to reduce development encroachment. Collectively, these results highlight the potential of land-use planning to keep people and development from encroaching on pipeline hazards. While this study indicates that planners in many areas address pipeline hazards, it also illustrates how changes to local practices can further reduce risks to human health, homeland security, and the environment.
Emergency management in health: key issues and challenges in the UK.
Lee, Andrew C K; Phillips, Wendy; Challen, Kirsty; Goodacre, Steve
2012-10-19
Emergency planning in the UK has grown considerably in recent years, galvanised by the threat of terrorism. However, deficiencies in NHS emergency planning were identified and the evidence-base that underpins it is questionable. Inconsistencies in terminologies and concepts also exist. Different models of emergency management exist internationally but the optimal system is unknown. This study examines the evidence-base and evidence requirements for emergency planning in the UK health context. The study involved semi-structured interviews with key stakeholders and opinion leaders. Purposive sampling was used to obtain a breadth of views from various agencies involved in emergency planning and response. Interviews were then analysed using a grounded approach using standard framework analysis techniques. We conducted 17 key informant interviews. Interviewees identified greater gaps in operational than technical aspects of emergency planning. Social and behavioural knowledge gaps were highlighted with regards to how individuals and organisations deal with risk and behave in emergencies. Evidence-based approaches to public engagement and for developing community resilience to disasters are lacking. Other gaps included how knowledge was developed and used. Conflicting views with regards to the optimal configuration and operation of the emergency management system were voiced. Four thematic categories for future research emerged:(i) Knowledge-base for emergency management: Further exploration is needed of how knowledge is acquired, valued, disseminated, adopted and retained.(ii) Social and behavioural issues: Greater understanding of how individuals approach risk and behave in emergencies is required.(iii) Organisational issues in emergencies: Several conflicting organisational issues were identified; value of planning versus plans, flexible versus standardized procedures, top-down versus bottom-up engagement, generic versus specific planning, and reactive versus proactive approaches to emergencies.(iv) Emergency management system: More study is required of system-wide issues relating to system configuration and operation, public engagement, and how emergency planning is assessed.
Dengue Contingency Planning: From Research to Policy and Practice.
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini
2016-09-01
Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.
Additive Manufacturing as a Sustainment Enabler: An Industry Perspective
2016-12-01
30 years with early emphasis and continued usage primarily during design and manufacturing of new systems. However, AM recently received increased...of newly designed AM-produced com- ponents into planned modifications and upgrades is an additional post- production opportunity funded by... manufacturing technology applications to the post- production stage. Putting together the solution relies on technical data management, applica- tion
ERIC Educational Resources Information Center
Barkin, Solomon, Ed.
The 29 case studies in this report seek to define the policies and practices followed by firms in programing technological change and manpower adjustments. The purpose of the report is to make these policies and practices more broadly known and to extend the range of effective adjustments provided by individual managements. The inquiries were…
A Baseline Description of DTIC Scientific and Technical Information Support System
1986-09-01
discussed below. Operations Research And Economic Analysis Office (DTIC-LO) This organizational element is currently being staffed. Its primary planned... Analysis Centers DASIAC - Ed Martin, Dave Reitz GACIAC - Richard Bartl* MCIAC - Helen Pestel * MMIAC - Sarah Ellingsworth...Overall Organization 2-5 Office Of The Administrator And Personal Staff 2-7 Equal Employment Opportunity Manager 2-7 Information Analysis
SDC DOCUMENTS APPLICABLE TO STATE AND LOCAL GOVERNMENT PROBLEMS.
Public administration , Urban and regional planning, The administration of justice, Bio-medical systems, Educational systems, Computer program systems, The development and management of computer-based systems, Information retrieval, Simulation. AD numbers are provided for those documents which can be obtained from the Defense Documentation Center or the Department of Commerce’s Clearinghouse for Federal Scientific and Technical Information.
ERIC Educational Resources Information Center
Schwartz, Stanley F.
This publication introduces electronic document imaging systems and provides guidance for local governments in New York in deciding whether such systems should be adopted for their own records and information management purposes. It advises local governments on how to develop plans for using such technology by discussing its advantages and…
Developing the Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap
2012-10-24
system attributes. These metrics track non-requirements performance, typically relate to production cost per unit, maintenance costs, training costs...immediately implement lessons learned from the training experience to the job, assuming the culture allows this. 1.3 MANAGEMENT PLAN/TECHNICAL OVERVIEW...resolving potential conflicts as they arise. Incrementally implement and continuously integrate capability in priority order, to ensure that final system
Evaluation of DoD Biological Safety and Security Implementation
2016-04-27
biosecurity policy and directives, plans, orders, and guidance across DoD Component laboratories that were conducting research using biological select ...taken, • ensure that all BSAT laboratories are inspected regularly according to a standardized set of criteria , • coordinate external technical and...Biological Select Agent and Toxins laboratory inspections. Management Comments and Our Response The Under Secretary of Defense for Acquisition
Cerulean Warbler Technical Group: Coordinating international research and conservation
Dawson, D.K.; Wigley, T.B.; Keyser, P.D.
2012-01-01
Effective conservation for species of concern requires interchange and collaboration among conservationists and stakeholders. The Cerulean Warbler Technical Group (CWTG) is a consortium of biologists and managers from government agencies, non-governmental organizations, academia, and industry, who are dedicated to finding pro-active, science-based solutions for conservation of the Cerulean Warbler (Setophaga cerulea). Formed in the United States in 2001, CWTG’s scope soon broadened to address the species’ ecology and conservation on both the breeding and non-breeding ranges, in partnership with biologists from South and Central America. In 2004, CWTG launched the Cerulean Warbler Conservation Initiative, a set of activities aimed at addressing information and conservation needs for the species. These include (1) studies in the core breeding range to assess Cerulean Warbler response to forest management practices and to identify mined lands that could be reforested to benefit the species, (2) ecological and demographic studies on the winter range, and (3) surveys of Cerulean Warbler distribution on the breeding and winter ranges and during migration. A rangewide conservation action plan has been completed, along with a more detailed conservation plan for the non-breeding range. CWTG and partners now move forward with on-the-ground conservation, while still addressing unmet information needs.
Scott, Ian A; Sullivan, Clair; Staib, Andrew
2018-05-24
Objective In an era of rapid digitisation of Australian hospitals, practical guidance is needed in how to successfully implement electronic medical records (EMRs) as both a technical innovation and a major transformative change in clinical care. The aim of the present study was to develop a checklist that clearly and comprehensively defines the steps that best prepare hospitals for EMR implementation and digital transformation. Methods The checklist was developed using a formal methodological framework comprised of: literature reviews of relevant issues; an interactive workshop involving a multidisciplinary group of digital leads from Queensland hospitals; a draft document based on literature and workshop proceedings; and a review and feedback from senior clinical leads. Results The final checklist comprised 19 questions, 13 related to EMR implementation and six to digital transformation. Questions related to the former included organisational considerations (leadership, governance, change leaders, implementation plan), technical considerations (vendor choice, information technology and project management teams, system and hardware alignment with clinician workflows, interoperability with legacy systems) and training (user training, post-go-live contingency plans, roll-out sequence, staff support at point of care). Questions related to digital transformation included cultural considerations (clinically focused vision statement and communication strategy, readiness for change surveys), management of digital disruption syndromes and plans for further improvement in patient care (post-go-live optimisation of digital system, quality and benefit evaluation, ongoing digital innovation). Conclusion This evidence-based, field-tested checklist provides guidance to hospitals planning EMR implementation and separates readiness for EMR from readiness for digital transformation. What is known about the topic? Many hospitals throughout Australia have implemented, or are planning to implement, hospital wide electronic medical records (EMRs) with varying degrees of functionality. Few hospitals have implemented a complete end-to-end digital system with the ability to bring about major transformation in clinical care. Although the many challenges in implementing EMRs have been well documented, they have not been incorporated into an evidence-based, field-tested checklist that can practically assist hospitals in preparing for EMR implementation as both a technical innovation and a vehicle for major digital transformation of care. What does this paper add? This paper outlines a 19-question checklist that was developed using a formal methodological framework comprising literature review of relevant issues, proceedings from an interactive workshop involving a multidisciplinary group of digital leads from hospitals throughout Queensland, including three hospitals undertaking EMR implementation and one hospital with complete end-to-end EMR, and review of a draft checklist by senior clinical leads within a statewide digital healthcare improvement network. The checklist distinguishes between issues pertaining to EMR as a technical innovation and EMR as a vehicle for digital transformation of patient care. What are the implications for practitioners? Successful implementation of a hospital-wide EMR requires senior managers, clinical leads, information technology teams and project management teams to fully address key operational and strategic issues. Using an issues checklist may help prevent any one issue being inadvertently overlooked or underemphasised in the planning and implementation stages, and ensure the EMR is fully adopted and optimally used by clinician users in an ongoing digital transformation of care.
A key to success: optimizing the planning process
NASA Astrophysics Data System (ADS)
Turk, Huseyin; Karakaya, Kamil
2014-05-01
By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air operation planning process is analyzed according to a comprehensive approach. The difficulties of planning are identified. Consequently, for optimizing a decisionmaking process of an air operation, a planning process is identified in a virtual command and control structure.
Jones, Michael; Chanturidze, Tata; Franzen, Sam; Manu, Alex; Naylor, Mike
2017-10-01
The Government of Kazakhstan is engaged in a "root and branch" modernisation of the health care sector. One aspect of the raft of modernisation programmes was to revisit the State Guaranteed Health Benefits Package, with the aim to review citizen entitlements to healthcare. This paper reviews the ongoing evolution of the planning of the health benefits package in Kazakhstan, with the main challenges encountered, and critical lessons learned, to be considered for similar attempts elsewhere. The main conclusions are that: the design process requires a blend of technical and socio-political analysis, because it attracts public interest, and therefore political risks; the scale and burden of analysis need to be kept to manageable proportions; and the relationship between the benefits package and funding modalities needs to be carefully managed by the State, to ensure access to declared entitlements to all members, including the most vulnerable, while keeping the package financially feasible. © 2017 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2017 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.
Quevauviller, Philippe; Barceló, Damia; Beniston, Martin; Djordjevic, Slobodan; Harding, Richard J; Iglesias, Ana; Ludwig, Ralf; Navarra, Antonio; Navarro Ortega, Alícia; Mark, Ole; Roson, Roberto; Sempere, Daniel; Stoffel, Markus; van Lanen, Henny A J; Werner, Micha
2012-12-01
The integration of scientific knowledge about possible climate change impacts on water resources has a direct implication on the way water policies are being implemented and evolving. This is particularly true regarding various technical steps embedded into the EU Water Framework Directive river basin management planning, such as risk characterisation, monitoring, design and implementation of action programmes and evaluation of the "good status" objective achievements (in 2015). The need to incorporate climate change considerations into the implementation of EU water policy is currently discussed with a wide range of experts and stakeholders at EU level. Research trends are also on-going, striving to support policy developments and examining how scientific findings and recommendations could be best taken on board by policy-makers and water managers within the forthcoming years. This paper provides a snapshot of policy discussions about climate change in the context of the WFD river basin management planning and specific advancements of related EU-funded research projects. Perspectives for strengthening links among the scientific and policy-making communities in this area are also highlighted. Copyright © 2012 Elsevier B.V. All rights reserved.
Use of multicriteria analysis (MCA) for sustainable hydropower planning and management.
Vassoney, Erica; Mammoliti Mochet, Andrea; Comoglio, Claudio
2017-07-01
Multicriteria analysis (MCA) is a decision-making tool applied to a wide range of environmental management problems, including renewable energy planning and management. An interesting field of application of MCA is the evaluation and analysis of the conflicting aspects of hydropower (HP) exploitation, affecting the three pillars of sustainability and involving several different stakeholders. The present study was aimed at reviewing the state of the art of MCA applications to sustainable hydropower production and related decision-making problems, based on a detailed analysis of the scientific papers published over the last 15 years on this topic. The papers were analysed and compared, focusing on the specific features of the MCA methods applied in the described case studies, highlighting the general aspects of the MCA application (purpose, spatial scale, software used, stakeholders, etc.) and the specific operational/technical features of the selected MCA technique (methodology, criteria, evaluation, approach, sensitivity, etc.). Some specific limitations of the analysed case studies were identified and a set of "quality indexes" of an exhaustive MCA application were suggested as potential improvements for more effectively support decision-making processes in sustainable HP planning and management problems. Copyright © 2017 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looney, B.; Eddy-Dilek, C.; Costanza, J.
2008-12-15
The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less
The Offshore Environmental Studies Program (1973-1989)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hurwitz, N.; Lang, W.; Norman, H.
1990-12-01
This report provides an overview of the first 15 years of the Environmental Studies Program (ESP), conducted initially by the Bureau of Land Management and now as part of the Minerals Management Service. From 1973 to 1988, the ESP spent nearly $500 million on studies directed to better understand the US Outer Continental Shelf (OCS) and coastal environment and to use this information to document or predict effects of offshore oil and gas activities. This report organizes the hundreds of completed studies and thousands of resulting documents into 15 study topic chapters. Each chapter cites selected studies and provides amore » general discussion of program objectives and results. Where appropriate, each topic is discussed by OCS Region (Alaska, Atlantic, Gulf of Mexico, and Pacific). The goal of this report is to provide readers with a general account of the ESP's technical accomplishments and sources of detailed information. An introductory chapter provides background on the history of the ESP, the OCS leasing process, and the planning processes and ongoing objectives of the ESP. Technical chapters explain: geology and hazards; physical oceanography and pollution transport; remote sensing; air quality; water quality; coastal impacts; ecological monitoring; fish and fisheries resources; coastal and marine birds; protected species; archaeological resources; sociology and community planning; economics; visual and recreational resources; and information synthesis, management, and dissemination. Each chapter has been processed separately for inclusion on the data base.« less
Suh, Siri; Moreira, Philippe; Ly, Moussa
2007-11-29
In Senegal, traditional supervision often focuses more on collection of service statistics than on evaluation of service quality. This approach yields limited information on quality of care and does little to improve providers' competence. In response to this challenge, Management Sciences for Health (MSH) has implemented a program of formative supervision. This multifaceted, problem-solving approach collects data on quality of care, improves technical competence, and engages the community in improving reproductive health care. This study evaluated changes in service quality and community involvement after two rounds of supervision in 45 health facilities in four districts of Senegal. We used checklists to assess quality in four areas of service delivery: infrastructure, staff and services management, record-keeping, and technical competence. We also measured community involvement in improving service quality using the completion rates of action plans. The most notable improvement across regions was in infection prevention.Management of staff, services, and logistics also consistently improved across the four districts. Record-keeping skills showed variable but lower improvement by region. The completion rates of action plans suggest that communities are engaged in improving service quality in all four districts. Formative supervision can improve the quality of reproductive health services, especially in areas where there is on-site skill building and refresher training. This approach can also mobilize communities to participate in improving service quality.
Suh, Siri; Moreira, Philippe; Ly, Moussa
2007-01-01
Background In Senegal, traditional supervision often focuses more on collection of service statistics than on evaluation of service quality. This approach yields limited information on quality of care and does little to improve providers' competence. In response to this challenge, Management Sciences for Health (MSH) has implemented a program of formative supervision. This multifaceted, problem-solving approach collects data on quality of care, improves technical competence, and engages the community in improving reproductive health care. Methods This study evaluated changes in service quality and community involvement after two rounds of supervision in 45 health facilities in four districts of Senegal. We used checklists to assess quality in four areas of service delivery: infrastructure, staff and services management, record-keeping, and technical competence. We also measured community involvement in improving service quality using the completion rates of action plans. Results The most notable improvement across regions was in infection prevention. Management of staff, services, and logistics also consistently improved across the four districts. Record-keeping skills showed variable but lower improvement by region. The completion rates of action plans suggest that communities are engaged in improving service quality in all four districts. Conclusion Formative supervision can improve the quality of reproductive health services, especially in areas where there is on-site skill building and refresher training. This approach can also mobilize communities to participate in improving service quality. PMID:18047678
DOE Office of Scientific and Technical Information (OSTI.GOV)
Certa, P.J.
1998-01-07
Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less
Construction and application research of Three-dimensional digital power grid in Southwest China
NASA Astrophysics Data System (ADS)
Zhou, Yang; Zhou, Hong; You, Chuan; Jiang, Li; Xin, Weidong
2018-01-01
With the rapid development of Three-dimensional (3D) digital design technology in the field of power grid construction, the data foundation and technical means of 3D digital power grid construction approaches perfection. 3D digital power grid has gradually developed into an important part of power grid construction and management. In view of the complicated geological conditions in Southwest China and the difficulty in power grid construction and management, this paper is based on the data assets of Southwest power grid, and it aims at establishing a 3D digital power grid in Southwest China to provide effective support for power grid construction and operation management. This paper discusses the data architecture, technical architecture and system design and implementation process of the 3D digital power grid construction through teasing the key technology of 3D digital power grid. The application of power grid data assets management, transmission line corridor planning, geological hazards risk assessment, environmental impact assessment in 3D digital power grid are also discussed and analysed.
Managed competition: an analysis of consumer concerns. The Working Group on Managed Competition.
1994-01-01
Advocates for health care reform (representing a broad range of constituencies) raise serious concerns about the ability of managed competition to meet the health care needs of the American people. Similarities in managed competition proposals include establishment of a collective purchasing authority, creation of health plans, standardization of rules and requirements, and limitation on tax subsidies. Managed competition proposals vary as to whether they call for true universality, meaningful cost containment, and fair financing. The article raises questions about managed competition, including the technical feasibility; the link to employment; the role for insurance companies; severing the link between insurance and income, age, or health status; comprehensive benefits; cost containment; the role for managed care; universality of coverage; and the role for insurance companies to make treatment decisions.
NASA Technical Reports Server (NTRS)
Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.
1989-01-01
The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.
Spatially explicit data: stewardship and ethical challenges in science.
Hartter, Joel; Ryan, Sadie J; Mackenzie, Catrina A; Parker, John N; Strasser, Carly A
2013-09-01
Scholarly communication is at an unprecedented turning point created in part by the increasing saliency of data stewardship and data sharing. Formal data management plans represent a new emphasis in research, enabling access to data at higher volumes and more quickly, and the potential for replication and augmentation of existing research. Data sharing has recently transformed the practice, scope, content, and applicability of research in several disciplines, in particular in relation to spatially specific data. This lends exciting potentiality, but the most effective ways in which to implement such changes, particularly for disciplines involving human subjects and other sensitive information, demand consideration. Data management plans, stewardship, and sharing, impart distinctive technical, sociological, and ethical challenges that remain to be adequately identified and remedied. Here, we consider these and propose potential solutions for their amelioration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frenkel, G.; Paterson, T.S.; Smith, M.E.
The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less
Technical Assistance Plan (TAP)
A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
Keyes, Emily B; Haile-Mariam, Abonesh; Belayneh, Neghist T; Gobezie, Wasihun A; Pearson, Luwei; Abdullah, Muna; Kebede, Henok
2011-10-01
To describe the methods used to implement Ethiopia's 2008 emergency obstetric and newborn care services (EmONC) assessment; highlight how the collaborative process contributed to immediate integration of results into national and subnational planning; and explain how the experience informed the development of a set of tools providing best practices and guidelines for other countries conducting similar assessments. A team of maternal and newborn health experts from the Federal Ministry of Health (FMOH), the United Nations Children's Fund (UNICEF), the World Health Organization (WHO), and the United Nations Population Fund (UNFPA), together with representatives from the Ethiopian Society of Obstetricians and Gynecologists, provided technical guidance for the 18-month process and facilitated demand for and use of the assessment results. Eighty-four trained data collectors administered 9 data collection modules in 806 public and private facilities. Field work and data were managed by a private firm who, together with the core team, implemented a multi-layered plan for data quality. Columbia University's Averting Maternal Death and Disability Program provided technical assistance. Results were published in national and regional reports and in 1-page facility factsheets informing subnational planning activities. Assessment results-which have been published in journal articles-informed water infrastructure improvements, efforts to expand access to magnesium sulfate, and FMOH and UN planning documents. The assessment also established a permanent database for future monitoring of the health system, including geographic locations of surveyed facilities. Ethiopia's assessment was successful largely because of active local leadership, a collaborative process, ample financial and technical support, and rapid integration of results into health system planning. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
Crew Transportation Technical Management Processes
NASA Technical Reports Server (NTRS)
Mckinnie, John M. (Compiler); Lueders, Kathryn L. (Compiler)
2013-01-01
Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.
Resource Planning Model | Energy Analysis | NREL
balancing authority. An image of a overlapping circles labelled Resource, Technical, Economic, and Market competing electricity technologies. An image of a overlapping circles labelled Resource, Technical, Economic ; Federal Resource Planning. Volume 1: Sectoral, Technical, and Economic Trends, NREL Technical Report (2016
An assessment of PERT as a technique for schedule planning and control
NASA Technical Reports Server (NTRS)
Sibbers, C. W.
1982-01-01
The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.
NASA Astrophysics Data System (ADS)
Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles
2015-04-01
In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.
Transforming an EPA QA/R-2 quality management plan into an ISO 9002 quality management system.
Kell, R A; Hedin, C M; Kassakhian, G H; Reynolds, E S
2001-01-01
The Environmental Protection Agency's (EPA) Office of Emergency and Remedial Response (OERR) requires environmental data of known quality to support Superfund hazardous waste site projects. The Quality Assurance Technical Support (QATS) Program is operated by Shaw Environmental and Infrastructure, Inc. to provide EPA's Analytical Operations Center (AOC) with performance evaluation samples, reference materials, on-site laboratory auditing capabilities, data audits (including electronic media data audits), methods development, and other support services. The new QATS contract awarded in November 2000 required that the QATS Program become ISO 9000 certified. In a first for an EPA contractor, the QATS staff and management successfully transformed EPA's QA/R-2 type Quality Management Plan into a Quality Management System (QMS) that complies with the requirements of the internationally recognized ISO 9002 standard and achieved certification in the United States, Canada, and throughout Europe. The presentation describes how quality system elements of ISO 9002 were implemented on an already existing quality system. The psychological and organizational challenges of the culture change in QATS' day-to-day operations will be discussed for the benefit of other ISO 9000 aspirants.
A Collection of Technical Papers
NASA Technical Reports Server (NTRS)
1995-01-01
Papers presented at the 6th Space Logistics Symposium covered such areas as: The International Space Station; The Hubble Space Telescope; Launch site computer simulation; Integrated logistics support; The Baikonur Cosmodrome; Probabalistic tools for high confidence repair; A simple space station rescue vehicle; Integrated Traffic Model for the International Space Station; Packaging the maintenance shop; Leading edge software support; Storage information management system; Consolidated maintenance inventory logistics planning; Operation concepts for a single stage to orbit vehicle; Mission architecture for human lunar exploration; Logistics of a lunar based solar power satellite scenario; Just in time in space; NASA acquisitions/logistics; Effective transition management; Shuttle logistics; and Revitalized space operations through total quality control management.
NASA Technical Reports Server (NTRS)
1981-01-01
The objectives, procedures, accomplishments, plans, and ultimate uses of information from current projects at the Mississippi Remote Sensing Center are discussed for the following applications: (1) land use planning; (2) strip mine inventory and reclamation; (3) biological management for white tailed deer; (4) forest habitats in potential lignite areas; (5) change discrimination in gravel operations; (6) discrimination of freshwater wetlands for inventory and monitoring; and (7) remote sensing data analysis support systems. The initiation of a conceptual design for a LANDSAT based, state wide information system is proposed.
[Philanthropic hospitals and the operation of provider-owned health plans in Brazil].
Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat
2007-02-01
To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.
Idaho National Laboratory Directed Research and Development FY-2009
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2010-03-01
The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefitmore » each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are appropriately handled. The LDRD Program is assessed annually for both output and process efficiency to ensure the investment is providing expected returns on technical capability enhancement. The call for proposals and project selection process for the INL LDRD program begins typically in April, with preliminary budget allocations, and submittal of the technical requests for preproposals. A call for preproposals is made at this time as well, and the preparation of full proposals follows in June and closes in July. The technical and management review follows this, and the portfolio is submitted for DOE-ID concurrence in early September. Project initiation is in early October. The technical review process is independent of, and in addition to the management review. These review processes are very stringent and comprehensive, ensuring technical viability and suitable technical risk are encompassed within each project that is selected for funding. Each proposal is reviewed by two or three anonymous technical peers, and the reviews are consolidated into a cohesive commentary of the overall research based on criteria published in the call for proposals. A grade is assigned to the technical review and the review comments and grade are released back to the principal investigators and the managers interested in funding the proposals. Management criteria are published in the call for proposals, and management comments and selection results are available for principal investigator and other interested management as appropriate. The DOE Idaho Operations Office performs a final review and concurs on each project prior to project authorization, and on major scope/budget changes should they occur during the project's implementation. This report begins with several research highlights that exemplify the diversity of scientific and engineering research performed at the INL in FY 2009. Progress summaries for all projects are organized into sections reflecting the major areas of research focus at the INL. These sections begin with the DOE-NE Nuclear Science and Technology mission support area, followed by the National and Homeland Security and the Energy and Environmental Science and Technology areas. The major INL initiatives and the INL's Distinctive Signatures areas complete the project summaries. The appendices provide information on project relevance to DOE missions and major national programs as well as an author index, list of refereed publications and index of key terms.« less
Product Definition Data Interface (PDDI) Product Specification
1991-07-01
syntax of the language gives a precise specification of the data without interpretation of it. M - Constituent Read Block. CSECT - Control Section, the...to conform to the PDDI Access Software’s internal data representation so that it may be further processed. JCL - Job Control Language - IBM language...software development and life cycle * phases. OUALITY CONTROL - The planned and systematic application of all actions (management/technical) necessary to
SERDP Ecosystem Management Project (SEMP): 2004 Technical Report
2006-06-01
sustainability and native biological diversity of terrestrial and aquatic, including marine , ecosystems while supporting hu- man needs, including the DoD mission...of DOD lands, 2. contribute baseline level biotic and abiotic data to the integrated monitoring plan of the host site, 3. establish a long-term...been several lessons learned concerning hardware selection, installation, and implemen- tation as well as equipment performance. All of the abiotic
Building Space Power for the Nation: Air Force Achievements Challenges and Opportunities
2006-01-01
since space capabilities play in planning and con- that time , they have advanced from simply ducting.joint military operations. Space forces proving...collect critical this is a relatively short period of time . Addi- itelligence over dtenied areas, primarily the tionally nnmerous changes in military...novative program management ; cutting-edge grams. Shifts in responsibilities, organization, technical and engineering expertise; rapid, and culture created
ERIC Educational Resources Information Center
Mostertman, L. J.
Because of the uncertainty related to water resources development projects, and because of the multitude of factors influencing their performance, the systems analysis approach is often used as an instrument in the planning and design process. The approach will also yield good results in the programming of the maintenance and management of the…
Methodology for Planning Technical Education: With a Case Study of Polytechnics in Bangladesh.
ERIC Educational Resources Information Center
Ritzen, Jozef M.; Balderston, Judith B.
A product of research first begun by one of the authors in Bangladesh, this book develops a comprehensive set of methods for planning technical education. Wherever possible, the authors draw on existing tools, fitting them to the specific context of technical education. When faced with planning problems for which existing methods are ill suited…
Strategic plan for infrastructure optimization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Donley, C.D.
This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-14
... Market and Planning Efficiency Through Improved Software; Notice of Technical Conference To Discuss Increasing Market and Planning Efficiency Through Improved Software May 7, 2010. Take notice that Commission... planning efficiency through improved software. [[Page 27342
Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Michelson, D.C.; Knox, N.P.
1987-09-01
The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less
From the microscope to the macroscopic: changing from the bench to portfolio management
Sachs, Michael
2017-01-01
A role in portfolio management is ideal for individuals who enjoy tackling challenges that have both technical and business components. Portfolio management provides objective insights and analytics to support research and development decision making and planning. Successful practitioners usually have strong analytical abilities developed from a background in either science or business. Portfolio managers often advise key decision makers at both the team and senior management level and thus require robust oral, written, and interpersonal communication skills. Day-to-day tasks are rarely the same, and comfort with change and the unknown is essential. Here I will discuss my experience as a portfolio manager in a larger biopharmaceutical company and the skills from academic research I leveraged to make the transition. PMID:29084911
Hardy, Scott D; Koontz, Tomas M
2008-03-01
Nonpoint source (NPS) pollution has emerged as the largest threat to water quality in the United States, influencing policy makers and resource managers to direct more attention toward NPS prevention and remediation. In response, the United States Environmental Protection Agency (USEPA) spent more than $204 million in fiscal year (FY) 2006 on the Clean Water Act's Section 319 program to combat NPS pollution, much of it on the development and implementation of watershed-based plans. State governments have also increasingly allocated financial and technical resources to collaborative watershed efforts within their own borders to fight NPS pollution. With increased collaboration among the federal government, states, and citizens to combat NPS pollution, more information is needed to understand how public resources are being used, by whom, and for what, and what policy changes might improve effectiveness. Analysis from a 50-state study suggests that, in addition to the average 35% of all Section 319 funds per state that are passed on to collaborative watershed groups, 35 states have provided financial assistance beyond Section 319 funding to support collaborative watershed initiatives. State programs frequently provide technical assistance and training, in addition to financial resources, to encourage collaborative partnerships. Such assistance is typically granted in exchange for requirements to generate a watershed action plan and/or follow a mutually agreed upon work plan to address NPS pollution. Program managers indicated a need for greater fiscal resources and flexibility to achieve water quality goals.
Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)
NASA Technical Reports Server (NTRS)
Niewoehner, Kevin R.; Carter, John (Technical Monitor)
2001-01-01
The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.
State-local policy management project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-08-01
The report describes case studies to explore new approaches for increasing state and local coordination in planning and managing programs in areas with significant scientific and technical components such as energy and environment. Specifically, the case studies reveal efforts of various states in the areas of energy conservation, weatherization, emergency preparedness, and air quality. Successes and failures of Maryland's decentralized approach to energy conservation are documented; success of the thermal and lighting efficiency standards program in Texas is discussed; state aid for local energy conservation programs in Clinton County, Michigan, is reviewed; and the success of the weatherization program inmore » Oregon is examined. Pilot programs in weatherization in Pennsylvania are shown to have led a statewide effort. Two Minnesota projects in emergency preparedness are documented and factors for success are listed. In addition, long-range planning for fuel shortages in New York is examined and the benefits of regional planning in Fairfax County, Virgina, are noted. Efforts are examined to improve air quality in Ohio, California, and New Jersey.« less
ERIC Educational Resources Information Center
Minnesota State Board for Vocational Education, St. Paul.
In March 1982, the Minnesota Division of Vocational-Technical Education received requests from State legislators to develop an action plan to address the problems of declining enrollments and resources. In response to this request, a plan was developed whereby area vocational-technical institutes (AVTIs) in the State would (1) promote a process…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...
A survey of managed care strategies for pregnant smokers.
Barker, D C; Robinson, L A; Rosenthal, A C
2000-01-01
The purpose of this study was to measure the content and comprehensiveness of pregnancy specific smoking cessation strategies within managed care organisations (MCOs) responding affirmatively to the national 1997-98 Addressing Tobacco in Managed Care (ATMC) survey. This cross sectional follow up study consisted of a fax survey sent to medical directors and a 37 question telephone survey of program overseers about the smoking cessation strategy. 147 MCOs identifying a pregnancy specific smoking cessation strategy on the 1997-98 ATMC survey served as the initial sample; 88 MCOs of 128 eligible plans completed both components, with a response rate of 69%. Pregnancy specific smoking cessation strategies varied. 40% of respondents used the Agency for Health Care Policy and Research guidelines for clinical smoking cessation to design their strategy. Strategies included self help materials, quit classes, telephone support and brief counselling by providers, linkages to quality improvement efforts, and use of patient databases for outreach. Only 42% offered a postpartum relapse prevention element. Lack of patient interest, competing clinic priorities, and the lack of a smoker identification system were the most problematic barriers to implementing strategies, common to at least a quarter of respondents. A majority ranked best practice manuals and web site linkages as the most useful form of technical assistance, followed by peer-to-peer counselling, regional workshops, newsletters, on-site assistance, and national conferences. The survey provides the first profile of prenatal tobacco treatment strategies in managed care. While design limitations prevent generalisation of these results to all MCOs, such information can help guide technical assistance to plans interested in reducing smoking among pregnant women.
Putnam, James E.; Hansen, Cristi V.
2014-01-01
As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.
Installation of Groundwater Monitoring Wells TAV-MW15 and TAV-MW16.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lum, Clinton C. L.
This report documents the installation of two groundwater monitoring wells at the Technical Area V Groundwater (TAVG) Area of Concern at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM is managed and operated by National Technology and Engineering Solutions of Sandia, LLC., a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA- 0003525. Well installation activities were conducted in accordance with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB)-approved work plan Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern (Workmore » Plan) (SNL/NM March 2016). The Work Plan was approved by NMED HWB prior to the start of field work (NMED May 2016). Project activities were performed from November 2016 through January 2017 by SNL/NM Environmental Restoration (ER) Operations personnel, and the SNL/NM drilling contractor Cascade Drilling LP. Drilling activities began with borehole drilling and sampling on November 30, 2016. Well construction and development fieldwork was completed on January 31, 2017. Land surveys to establish the location coordinates and elevations of the two wells were completed on March 23, 2017, and transmitted to SNL/NM personnel on April 17, 2017.« less
Quality user support: Supporting quality users
DOE Office of Scientific and Technical Information (OSTI.GOV)
Woolley, T.C.
1994-12-31
During the past decade, fundamental changes have occurred in technical computing in the oil industry. Technical computing systems have moved from local, fragmented quantity, to global, integrated, quality. The compute power available to the average geoscientist at his desktop has grown exponentially. Technical computing applications have increased in integration and complexity. At the same time, there has been a significant change in the work force due to the pressures of restructuring, and the increased focus on international opportunities. The profile of the user of technical computing resources has changed. Users are generally more mature, knowledgeable, and team oriented than theirmore » predecessors. In the 1990s, computer literacy is a requirement. This paper describes the steps taken by Oryx Energy Company to address the problems and opportunities created by the explosive growth in computing power and needs, coupled with the contraction of the business. A successful user support strategy will be described. Characteristics of the program include: (1) Client driven support; (2) Empowerment of highly skilled professionals to fill the support role; (3) Routine and ongoing modification to the support plan; (4) Utilization of the support assignment to create highly trained advocates on the line; (5) Integration of the support role to the reservoir management team. Results of the plan include a highly trained work force, stakeholder teams that include support personnel, and global support from a centralized support organization.« less
Maintaining technical excellence requires a national plan
NASA Technical Reports Server (NTRS)
Davidson, T. F.
1991-01-01
To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.
Dollar, Daniel M; Gallagher, John; Glover, Janis; Marone, Regina Kenny; Crooker, Cynthia
2007-04-01
To support migration from print to electronic resources, the Cushing/Whitney Medical Library at Yale University reorganized its Technical Services Department to focus on managing electronic resources. The library hired consultants to help plan the changes and to present recommendations for integrating electronic resource management into every position. The library task force decided to focus initial efforts on the periodical collection. To free staff time to devote to electronic journals, most of the print subscriptions were switched to online only and new workflows were developed for e-journals. Staff learned new responsibilities such as activating e-journals, maintaining accurate holdings information in the online public access catalog and e-journals database ("electronic shelf reading"), updating the link resolver knowledgebase, and troubleshooting. All of the serials team members now spend significant amounts of time managing e-journals. The serials staff now spends its time managing the materials most important to the library's clientele (e-journals and databases). The team's proactive approach to maintenance work and rapid response to reported problems should improve patrons' experiences using e-journals. The library is taking advantage of new technologies such as an electronic resource management system, and library workflows and procedures will continue to evolve as technology changes.
Between Oais and Agile a Dynamic Data Management Approach
NASA Astrophysics Data System (ADS)
Bennett, V. L.; Conway, E. A.; Waterfall, A. M.; Pepler, S.
2015-12-01
In this paper we decribe an approach to the integration of existing archival activities which lies between compliance with the more rigid OAIS/TRAC standards and a more flexible "Agile" approach to the curation and preservation of Earth Observation data. We provide a high level overview of existing practice and discuss how these procedures can be extended and supported through the description of preservation state. The aim of which is to facilitate the dynamic controlled management of scientific data through its lifecycle. While processes are considered they are not statically defined but rather driven by human interactions in the form of risk management/review procedure that produce actionable plans, which are responsive to change. We then proceed by describing the feasibility testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospheric Data Centre and NERC Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2 Petabytes of data and 137 million individual files, which were analysed and characterised in terms of format, based risk. We are then able to present an overview of the format based risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets We continue by presenting a dynamic data management information model and provide discussion of the following core model entities and their relationships: Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans which support responsive interactions with the community. The Result entities describe the outcomes of the plans. This includes Acquisitions. Mitigations and Accepted Risks. With risk acceptance permitting imperfect but functional solutions that can be realistically supported within an archives resource levels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schonewill, Philip P.; Russell, Renee L.; Daniel, Richard C.
The Low Activity Waste Pretreatment System (LAWPS) is being designed to enable the direct feed of waste to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to be immobilized. Prior to construction of the LAWPS, pilot-scale integrated testing of the key unit operations (crossflow filtration, ion exchange using spherical resorcinol-formaldehyde (sRF) resin) will be conducted by a team led by Washington River Protection Solutions (WRPS) to increase the technology maturation level of the facility’s critical technology elements. As a part of this effort, Pacific Northwest National Laboratory (PNNL) has conducted a series of bench-scalemore » (or engineering-scale) tests to perform two major objectives: (1) support pilot-scale integrated testing of the LAWPS by supplying information or performance data in advance of operating the pilot-scale facility; and (2) collect data needed to establish or confirm assumptions/approaches planned for implementation in the LAWPS safety basis. The first objective was focused in two technical areas: developing simulants that are representative of expected waste feed and can be produced at larger scales, and using these simulants in a bench-scale crossflow filter to establish expected solid-liquid separation performance. The crossflow filter was also used to observe the efficacy (with respect to filter production rate) of selected operational strategies. The second objective also included two technical areas: measuring the effect of sRF resin on hydrogen generation rate under irradiation, and demonstrating that the planned hydrogen management approach is effective and robust. The hydrogen management strategy involves fluidization of the sRF resin bed in the ion exchange columns and recirculating the liquid, a scenario that is planned for testing at full column height. The full height tests at PNNL also supported full-scale IX column testing conducted as part of the technology maturation plan. The experimental approaches used at PNNL in these four technical areas are summarized and selected key preliminary results are provided.« less
ERIC Educational Resources Information Center
Yu, Zuguang; Zeng, Zida
Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…
The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management
NASA Technical Reports Server (NTRS)
Shinn, Stephen A.; Bryson, Jonathan; Klein, Gerald; Lunz-Ruark, Val; Majerowicz, Walt; McKeever, J.; Nair, Param
2016-01-01
Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.
Chanda, Emmanuel; Ameneshewa, Birkinesh; Mihreteab, Selam; Berhane, Araia; Zehaie, Assefash; Ghebrat, Yohannes; Usman, Abdulmumini
2015-12-02
Contemporary malaria vector control relies on the use of insecticide-based, indoor residual spraying (IRS) and long-lasting insecticidal nets (LLINs). However, malaria-endemic countries, including Eritrea, have struggled to effectively deploy these tools due technical and operational challenges, including the selection of insecticide resistance in malaria vectors. This manuscript outlines the processes undertaken in consolidating strategic planning and operational frameworks for vector control to expedite malaria elimination in Eritrea. The effort to strengthen strategic frameworks for vector control in Eritrea was the 'case' for this study. The integrated vector management (IVM) strategy was developed in 2010 but was not well executed, resulting in a rise in malaria transmission, prompting a process to redefine and relaunch the IVM strategy with integration of other vector borne diseases (VBDs) as the focus. The information sources for this study included all available data and accessible archived documentary records on malaria vector control in Eritrea. Structured literature searches of published, peer-reviewed sources using online, scientific, bibliographic databases, Google Scholar, PubMed and WHO, and a combination of search terms were utilized to gather data. The literature was reviewed and adapted to the local context and translated into the consolidated strategic framework. In Eritrea, communities are grappling with the challenge of VBDs posing public health concerns, including malaria. The global fund financed the scale-up of IRS and LLIN programmes in 2014. Eritrea is transitioning towards malaria elimination and strategic frameworks for vector control have been consolidated by: developing an integrated vector management (IVM) strategy (2015-2019); updating IRS and larval source management (LSM) guidelines; developing training manuals for IRS and LSM; training of national staff in malaria entomology and vector control, including insecticide resistance monitoring techniques; initiating the global plan for insecticide resistance management; conducting needs' assessments and developing standard operating procedure for insectaries; developing a guidance document on malaria vector control based on eco-epidemiological strata, a vector surveillance plan and harmonized mapping, data collection and reporting tools. Eritrea has successfully consolidated strategic frameworks for vector control. Rational decision-making remains critical to ensure that the interventions are effective and their choice is evidence-based, and to optimize the use of resources for vector control. Implementation of effective IVM requires proper collaboration and coordination, consistent technical and financial capacity and support to offer greater benefits.
research, analysis, and technical assistance on municipal energy planning and policy, utility-scale Baseline Analysis of Municipal Codification across the U.S., NREL Technical Report (2016) Navajo Generating Station & Federal Resource Planning - Volume 1: Sectoral, Technical, and Economic Trends, NREL
Evolving the Technical Infrastructure of the Planetary Data System for the 21st Century
NASA Technical Reports Server (NTRS)
Beebe, Reta F.; Crichton, D.; Hughes, S.; Grayzeck, E.
2010-01-01
The Planetary Data System (PDS) was established in 1989 as a distributed system to assure scientific oversight. Initially the PDS followed guidelines recommended by the National Academies Committee on Data Management and Computation (CODMAC, 1982) and placed emphasis on archiving validated datasets. But overtime user demands, supported by increased computing capabilities and communication methods, have placed increasing demands on the PDS. The PDS must add additional services to better enable scientific analysis within distributed environments and to ensure that those services integrate with existing systems and data. To face these challenges the Planetary Data System (PDS) must modernize its architecture and technical implementation. The PDS 2010 project addresses these challenges. As part of this project, the PDS has three fundamental project goals that include: (1) Providing more efficient client delivery of data by data providers to the PDS (2) Enabling a stable, long-term usable planetary science data archive (3) Enabling services for the data consumer to find, access and use the data they require in contemporary data formats. In order to achieve these goals, the PDS 2010 project is upgrading both the technical infrastructure and the data standards to support increased efficiency in data delivery as well as usability of the PDS. Efforts are underway to interface with missions as early as possible and to streamline the preparation and delivery of data to the PDS. Likewise, the PDS is working to define and plan for data services that will help researchers to perform analysis in cost-constrained environments. This presentation will cover the PDS 2010 project including the goals, data standards and technical implementation plans that are underway within the Planetary Data System. It will discuss the plans for moving from the current system, version PDS 3, to version PDS 4.
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
Management Plans Technical Appendix - Phase 1 (Central Puget Sound). Volume 4
1988-06-01
measure without substantially more samples and analysis or significantly reducing the desired confidence level . Consequently, the study participants...disposal occurs in ac- (9) An application and a lease fee will be charged at a cordance with permit conditions. Compliance measures rate sufficient to...site are sufficient to characterize the material. The bloassays are a cost effective measure of the biological effects of concern within the disposal
Support increased adoption of green infrastructure into ...
This project will provide technical assistance to support implementation of GI in U.S. communities and information on best practices for GI approaches that protect ground water supplies. Case studies that can be more broadly applied to other communities will be conducted. The project will provide program and regional offices with guidance on GI planning, implementation, and maintenance for stormwater management and capture/aquifer storage. To share information on SSWR research projects
River Protection Project Technology and Innovation Roadmap.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reid, D. S.; Wooley, T. A.; Kelly, S. E.
The Technology and Innovation Roadmap is a planning tool for WRPS management, DOE ORP, DOE EM, and others to understand the risks and technology gaps associated with the RPP mission. The roadmap identifies and prioritizes technical areas that require technology solutions and underscores where timely and appropriate technology development can have the greatest impact to reduce those risks and uncertainties. The roadmap also serves as a tool for determining allocation of resources.
The Lister Hill National Center for Biomedical Communications.
Smith, K A
1994-09-01
On August 3, 1968, the Joint Resolution of the Congress established the program and construction of the Lister Hill National Center for Biomedical Communications. The facility dedicated in 1980 contains the latest in computer and communications technologies. The history, program requirements, construction management, and general planning are discussed including technical issues regarding cabling, systems functions, heating, ventilation, and air conditioning system (HVAC), fire suppression, research and development laboratories, among others.
Technology Transfer: A Compilation of Varied Approaches to the Management of Innovation.
1982-12-01
Objectives. Risk. Technical interest. Social pressure. In Phase Two of the data review, the student-annotated articles were re-ordered by chapter...Type Plans--A. J. Geare Chapter 12. Willingness 71. The Absorption Rate of Ideas--G. Gallup 72. Innovacion -Resisting and Innovation-Producing...their questionable impact on social institu- tions. While technology has been clearly beneficial to many people, it has been of dubious value in
Plow Shop Pond Supplemental Investigation Work Plan
1994-09-01
the results of the TIE, major contributors to sediment toxicity in Plow I Shop will be identified. Site-specific numerical criteria for contaminants in...consume Plow Shop Pond fish is less than 1.3". ABB-ES would use an available software package to generate the probability distributions. 5 If...Fort Devens project. The Project Manager is responsible for confirming the appropriateness and adequacy of the technical or engineering services
ERIC Educational Resources Information Center
System Development Corp., Santa Monica, CA.
A national data program for the marine environment is recommended. Volume 2 includes: (1) objectives, scope, and methodology; (2) summary of the technical development plan; (3) agency development plans - Great Lakes and coastal development and (4) marine data network development plans. (Author)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaminsky, J.; Tschanz, J.F.
In order to adress barriers to community energy-conservation efforts, DOE has established the Comprehensive Community Energy Management (CCEM) program. The role of CCEM is to provide direction and technical support for energy-conservation efforts at the local level. The program to date has included project efforts to develop combinations and variations of community energy planning and management tools applicable to communities of diverse characteristics. This paper describes the salient features of some of the tools and relates them to the testing program soon to begin in several pilot-study communities. Two methodologies that arose within such an actual planning context are takenmore » from DOE-sponsored projects in Clarksburg, West Virginia and the proposed new capital city for Alaska. Energy management in smaller communities and/or communities with limited funding and manpower resources has received special attention. One project of this type developed in general methodology that emphasizes efficient ways for small communities to reach agreement on local energy problems and potential solutions; by this guidance, the community is led to understand where it should concentrate its efforts in subsequent management activities. Another project concerns rapid growth of either a new or an existing community that could easily outstrip the management resources available locally. This methodology strives to enable the community to seize the opportunity for energy conservation through integrating the design of its energy systems and its development pattern. The last methodology creates applicable tools for comprehensive community energy planning. (MCW)« less
ISS Crew Transportation and Services Requirements Document
NASA Technical Reports Server (NTRS)
Lueders, Kathryn L. (Compiler)
2015-01-01
Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document with its sister documents, Crew Transportation Technical Management Processes (CCT-PLN-1120), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), and Crew Transportation Operations Standards (CCT-STD-1150), and International Space Station (ISS) to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase of the NASA Commercial Crew Program (CCP).
NASA Space Environments Technical Discipline Team Space Weather Activities
NASA Astrophysics Data System (ADS)
Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.
2017-12-01
The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.
Environment, Safety and Health Self-Assessment Report Fiscal Year 2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, Scott
2011-03-23
The Lawrence Berkeley National Laboratory (LBNL) Environment, Safety, and Health (ES&H) Self-Assessment Program was established to ensure that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The ES&H Self-Assessment Program, managed by the Office of Contractor Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The primary objective of the program is to ensure that work is conducted safely and with minimal negative impact to workers, the public, and the environment. Self-assessment follows the five core functions and guiding principles of ISM. Self-assessment is the mechanism used to promote the continuousmore » improvement of the Laboratory's ES&H programs. The process is described in the Environment, Safety, and Health Assurance Plan (PUB-5344) and is composed of three types of self-assessments: Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review. The Division ES&H Self-Assessment Manual (PUB-3105) provides the framework by which divisions conduct formal ES&H self-assessments to systematically identify program deficiencies. Issue-specific assessments are designed and implemented by the divisions and focus on areas of interest to division management. They may be conducted by teams and involve advance planning to ensure that appropriate resources are available. The ES&H Technical Assurance Program Manual (PUB-913E) provides the framework for systematic reviews of ES&H programs and processes. The ES&H Technical Assurance Program Assessment is designed to evaluate whether ES&H programs and processes are compliant with guiding regulations, are effective, and are properly implemented by LBNL divisions. The Division ES&H Peer Review Manual provides the framework by which division ISM systems are evaluated and improved. Peer Reviews are conducted by teams under the direction of senior division management and focus on higher-level management issues. Peer Review teams are selected on the basis of members knowledge and experience in the issues of interest to the division director. LBNL periodically requests in-depth independent assessments of selected ES&H programs. Such assessments augment LBNL's established assessment processes and provide an objective view of ES&H program effectiveness. Institutional Findings, Observations, and Noteworthy Practices identified during independent assessments are specifically intended to help LBNL identify opportunities for program improvement. This report includes the results of the Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review, respectively.« less
Design considerations for community mental health management information systems.
Lowe, B H; Sugarman, B
1978-01-01
Many community mental health centers are presently faced with the necessity of implementing a management information system. This article offers guidelines for centers dealing with this situation. Whether a center chooses to adapt an existing system or develop one of its own, careful planning prior to the implementation of the system can help ensure that it will meet the needs of the center and operate successfully. The guidelines are organized into the categories of data considerations, people considerations, and system considerations. The first two categories are of general interest, whereas the last category is more technical in nature.
Atrial Macroreentry in Congenital Heart Disease
Twomey, Darragh J; Sanders, Prashanthan; Roberts-Thomson, Kurt C
2015-01-01
Macroreentrant atrial tachycardia is a common complication following surgery for congenital heart disease (CHD), and is often highly symptomatic with potentially significant hamodynamic consequences. Medical management is often unsuccessful, requiring the use of invasive procedures. Cavotricuspid isthmus dependent flutter is the most common circuit but atypical circuits also exist, involving sites of surgical intervention or areas of scar related to abnormal hemodynamics. Ablation can be technically challenging, due to complex anatomy, and difficulty with catheter stability. A thorough assessment of the pa-tients status and pre-catheter ablation planning is critical to successfully managing these patients. PMID:25308809
Planning as an Iterative Process
NASA Technical Reports Server (NTRS)
Smith, David E.
2012-01-01
Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.
Technical area status report for waste destruction and stabilization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dalton, J.D.; Harris, T.L.; DeWitt, L.M.
1993-08-01
The Office of Environmental Restoration and Waste Management (EM) was established by the Department of Energy (DOE) to direct and coordinate waste management and site remediation programs/activities throughout the DOE complex. In order to successfully achieve the goal of properly managing waste and the cleanup of the DOE sites, the EM was divided into five organizations: the Office of Planning and Resource Management (EM-10); the Office of Environmental Quality Assurance and Resource Management (EM-20); the Office of Waste Operations (EM-30); the Office of Environmental Restoration (EM-40); and the Office of Technology and Development (EM-50). The mission of the Office ofmore » Technology Development (OTD) is to develop treatment technologies for DOE`s operational and environmental restoration wastes where current treatment technologies are inadequate or not available. The Mixed Waste Integrated Program (MWIP) was created by OTD to assist in the development of treatment technologies for the DOE mixed low-level wastes (MLLW). The MWIP has established five Technical Support Groups (TSGs) whose purpose is to identify, evaluate, and develop treatment technologies within five general technical areas representing waste treatment functions from initial waste handling through generation of final waste forms. These TSGs are: (1) Front-End Waste Handling, (2) Physical/Chemical Treatment, (3) Waste Destruction and Stabilization, (4) Second-Stage Destruction and Offgas Treatment, and (5) Final Waste Forms. This report describes the functions of the Waste Destruction and Stabilization (WDS) group. Specifically, the following items are discussed: DOE waste stream identification; summary of previous efforts; summary of WDS treatment technologies; currently funded WDS activities; and recommendations for future activities.« less
Presentation Of Comparative Data for Transportation Planning Studies
DOT National Transportation Integrated Search
1997-01-01
Clear, yet detailed, presentations of transportation planning data to lay groups as well as to technical groups is becoming more and more of a necessity in the planning process. Presentation of technical information in understandable terms has become...
7 CFR 4284.621 - Eligible grant purposes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... by providing technical assistance for business development and economic development planning. Grant...-county economic development planning; (5) Establish centers for training, technology, and trade that will... professional services necessary to conduct the technical assistance, training, or planning functions. (b...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren
2003-10-01
In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations,more » and guilds.« less
New Directions for High School Career and Technical Education in Wyoming: A Strategic Plan
ERIC Educational Resources Information Center
Hoachlander, Gary; Klein, Steven; Studier, Carol
2007-01-01
This report offers a plan for improving career and technical education (CTE) in Wyoming, but it is about more than just technical education. Realizing the potential of CTE to contribute to students' mastery of both academic and technical knowledge depends not only on strengthening the CTE curriculum, but also on embedding CTE in a larger program…
ERIC Educational Resources Information Center
Klose, Traugott
Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…
ERIC Educational Resources Information Center
Colombo Plan Bureau (Sri Lanka).
Focusing on the last in a series of seven seminars conducted by the Colombo Plan Bureau between 1969 and 1975 on the theme, "National Planning of Vocational and Technical Training," this report presents the proceedings of a seminar on the vocational education and training needs of one of the Colombo Plan members, Bhutan. Five working…
Backstop: Shuttle Will Fly with Outstanding Waivers; New Oversight Eases Conflicts on Safety
NASA Technical Reports Server (NTRS)
Morring, Frank, Jr.
2005-01-01
he space shuttle Discovery is carrying some 300 waivers to technical specifications as it enters the home stretch of its planned return to flight next month. There were about 6,000 waivers in place when Columbia crashed. Shuttle managers say they are working to reduce the number of waivers remaining by fixing the problems they highlight, a change prompted by the Columbia Accident Investigation Board. In the wake of the accident, NASA has heeded the CAWS recommendation that waivers be the responsibility of an "independent technical authority" (ITA), rather than the shuttle program itself. To carry out the recommendation of the CAIB-which found an inherent conflict of interest in having the same managers make decisions about cost, schedule and safety-then-Administrator Sean O'Keefe designated the agency's chief engineer as the formal ITA. He is responsible for setting, maintaining and granting waivers across the agency. In mid-January, Fred Gregory, then O'Keefe's deputy and now his acting replacement, launched the ITA within NASA under Chief Engineer Rex Geveden, the former program manager on the Gravity Probe B experiment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Easterbrooks, John A.; Pearsons, Todd N.
2003-03-01
The Yakima/Klickitat Fisheries Project (YKFP) is a supplementation project sponsored by the Northwest Power Planning Council (Columbia River Basin Fish and Wildlife Program 1994, Measure 7.4K). The objectives of the YKFP are: (1) to test the hypothesis that new supplementation techniques can be used in the Yakima River Basin to increase natural production and to improve harvest opportunities while maintaining the long-term genetic fitness of the wild and native salmonid populations and keeping adverse ecological interactions within acceptable limits (Yakima Fisheries Project Final Environment Impact Statement, 1996); (2) provide knowledge about the use of supplementation, so that it may bemore » used to mitigate effects on anadromous fisheries throughout the Columbia River Basin; (3) to maintain and improve the quantity and productivity of salmon and steelhead habitat, including those areas made accessible by habitat improvements; (4) to ensure that Project implementation remains consistent with the Council's Fish and Wildlife Program; and (5) to implement the Project in a prudent and environmentally sound manner. Current YKFP operations have been designed to test the principles of supplementation (Busack et al. 1997). The Project's experimental design has focused on the following critical uncertainties affecting supplementation: (1) The survival and reproductive success of hatchery fish after release from the hatchery; (2) The impacts of hatchery fish as they interact with non-target species and stocks; and, (3) The effects of supplementation on the long-term genetic fitness of fish stocks. The YKFP endorses an adaptive management policy applied through a project management framework as described in the Yakima/Klickitat Fisheries Project Planning Status Report (1995), Fast and Craig (1997), Clune and Dauble 1991. The project is managed by a Policy Group consisting of a representative of the Yakama Nation (YN, lead agency) and a representative of the Washington Department of Fish and Wildlife (WDFW). The functions of the parties are described in an MOU between the YN and the WDFW. A Scientific and Technical Advisory Committee (STAC) consisting of one representative from each management entity reports to the Policy Group and provides technical input on policy and other issues. Additional committee's, such as the Monitoring Implementation and Planning Team (MIPT), serve as the discretion of STAC. The Policy Group and STAC meet periodically (usually monthly) to conduct the business of the YKFP. Although the YKFP is an all stocks initiative (BPA 1996), most effort to date has been directed at spring chinook salmon and coho salmon. This report is a compilation of the year's activities between August 1, 2001 and July 31, 2002. All findings should be considered preliminary until data collection is completed or the information is published in a peer-reviewed journal.« less
Davidson, Anne; McKerrow, Alexa; Long, Don; Earnhardt, Todd
2015-01-01
The intended target audience for this document initially is management and project technical specialist and scientists involved in the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - (LANDFIRE) program to help communicate coordination activities to all involved parties. This document is also intended to give background information in other parts of the USGS and beyond, although some details given are relatively oriented to management of the respective programs. Because the Gap Analysis Program (GAP) and the Landscape Fire and Resource Management Planning Tools - LANDFIRE programs both rely on characterizations of land cover using similar scales and resolutions, the programs have been coordinating their work to improve scientific consistency and efficiency of production. Initial discussions and informal sharing of ideas and work began in 2008. Although this collaboration was fruitful, there was no formal process for reporting results, plans, or outstanding issues, nor was there any formally-defined coordinated management team that spanned the two programs. In 2012, leadership from the two programs agreed to strengthen the coordination of their respective work efforts. In 2013 the GAP and LANDFIRE programs developed an umbrella plan of objectives and components related to three mutual focus areas for the GAP and LANDFIRE collaboration for the years 2013 and 2014 (GAP/LANDFIRE 2013). The evolution of this partnership resulted in the drafting of an inter-program Memorandum of Understanding (MOU) in 2014. This MOU identified three coordination topics relevant to the two programs participating at this point in the MOU history: Vegetation mappingDisturbance classesFormal quality assessment
Marita, Enock; Oule, Jared; Mungai, Margaret; Thiam, Sylla; Ilako, Festus
2016-01-01
Civil Society Organizations (CSOs) contribute to achieving development goals through advocacy, social mobilisation and provision of health services. CSO programming is a key component of Global Fund (GF) grants; however, CSOs face technical and governance capacity challenges in grant utilisation leading to missed opportunities for improving health at community level. Amref Health Africa was appointed Principal Recipient of a GF grant aimed at scaling up community case management of malaria through CSOs as sub-recipients in western Kenya. To identify potential risks and strengthen grant management, Amref Health Africa and the Ministry of Health conducted a capacity needs assessment to determine the capacity of CSOs to effectively utilise grants. 26 selected CSOs participated in this study. Document reviews and on-site assessments and observations were conducted using structured tool. The five main assessment areas were: governance and risk management; strategic and operational planning; monitoring and evaluation; programme management; and financial management. Overall performance was grouped into four categories: 3.0-2.5 (excellent), 2.0-2.4 (good), 1.5-1.9 (fair), and 1.0-1.4 (poor). Data were collected and analysed using Excel software. Twenty five out of 26 CSOs were legally compliant. 14(54%) CSOs were categorized as good; 7(27%) as excellent; 3(12%) as poor and 2(8%) as fair. Most CSOs had good programme management capacity but monitoring and evaluation presented the most capacity gaps. More than 75% of the CSOs were rated as excellent or good. A capacity building plan, programme risk management plan and oversight mechanisms were important for successful grant implementation.
Dengue Contingency Planning: From Research to Policy and Practice
Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini
2016-01-01
Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan. PMID:27653786
2014-02-24
The U.S. Office of Personnel Management (OPM) is issuing a final rule implementing modifications to the Multi-State Plan (MSP) Program based on the experience of the Program to date. OPM established the MSP Program pursuant to the Affordable Care Act. This rule clarifies the approach used to enforce the applicable standards of the Affordable Care Act with respect to health insurance issuers that contract with OPM to offer MSP options; amends MSP standards related to coverage area, benefits, and certain contracting provisions under section 1334 of the Affordable Care Act; and makes non-substantive technical changes.
Transuranic Waste Test Facility Development Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looper, M.G.
1987-05-05
This letter discusses the development and test program planned for the Transuranic Waste Test Facility (TWTF). The planned effort is based on previous work in the ADandD Pilot Facility and testing of TWTF equipment before installation. Input from Waste Management and AED Fairview is included. The program will focus on the following areas: Retrieval; Material Handling; Size Reduction; Operation and Maintenance. The program will take 1-1/2 to 2 years to complete and began in December 1986. Technical Data Summaries (TDS) and basic data reports will be issued periodically to document results and provide basic data for the Transuranic Waste Facilitymore » (TWF). 2 refs., 2 figs.« less
Development of an Updated Strategic Marketing Plan for Fox Valley Technical College.
ERIC Educational Resources Information Center
May, Susan A.
This project was conducted to develop a comprehensive strategic marketing plan for Fox Valley Technical College (FVTC). Components included a review of the literature, establishing criteria for the plan, validation of the criteria, the actual development of the plan involving a formative committee, and the review of institutional marketing plans…
LBNL report of the vetting review of the GRETINA project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.
GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposalmore » received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas that may be incomplete for the current phase in the project and any area of significant risk for the project reaching its objectives. The committee was also asked to review and evaluate the technical status of the project and advise on any concerns or significant technical risks.« less
NASA Astrophysics Data System (ADS)
Rioust, E.; Deroubaix, J. F.; Barroca, B.; Bonierbale, T.; de Gouvello, B.; Deutsch, J. C.; Hubert, G.
2009-04-01
This paper considers the resilience perspective as an approach for understanding social and political vulnerabilities of urban services. The authors examine to what extend uncertainty due to climate change may affect the resilience of these urban services. The resilience perspective is increasingly used for analysing social groups' capacities to adapt to and live with disturbances. A lot of work on resilience has focused on the capacity to absorb shocks and still maintain functions. But there is also another aspect of resilience, which leads to take into account systems vulnerabilities and to aim at understanding their equilibrium and re-organization capacity. The purpose with this paper is to assess sewage systems capacities to adapt to climate change. Indeed, climate change could cause an increase of extreme rain events and, as a matter of consequence, an increase of sewer overflows and flooding of urbanised areas. Sewer systems have to cope with this change that may gravely affect urban planning. In recent studies of political science, risk management has been considered as a public policy involving and resulting from complex social, political and technical processes (Gilbert et al. 2003). From this point of view, the management of wastewaters and storm waters has to be considered not only as a technical but also as a political and a social system. Therefore, political science can be a fruitful perspective to understand the stakeholders perceptions of uncertainty and the way they are going to integrate this issue in their practices. The authors analyse the adaptive capacities of two sewer systems located in the Parisian suburban area. The chosen areas are highly populated. Each network is managed within a political and administrative unit called "Département". Both authorities of these "Départements" implement a public sewage service. Nonetheless these networks are connected and part of the greater Paris sewage policy. In both areas a real time control of urban wastewater systems has been developed. At last, both sewage services have make flood management their prior objective. Both "Départements" have developed retention capacities. One of them has implemented a source control strategy including daywatering while the other one has intent on building up a "culture of risk" on the territory. In this paper we compare how these social and technical systems cope with risks and face to climate change. Relying on interviews conducted with engineers and technical agents of water and sewage services and with a few residents in the concerned areas, we define three types of actors who take part to the social and technical systems. There are, on the one hand, the technical actors, including the agents currently managing the sewer network. On the other hand, there are the political actors in charge of elaborating and implementing a policy of risk prevention and managing the security force. Last but not least, there are the inhabitants who take an important part in the crisis management and in the mobilisations against the existing risk policy. The first part of the paper describes the sewage systems while there is no crisis. We explicit the actors' perceptions of risk and the risk management strategies they develop. The risk perceptions of technicians are truly different than the citizens' ones. For the technicians, floods, and their possible worsening, could be controlled. The problem is generated by the increasing impervious areas but it can be solved with technologies (real time control, best management practices and compensatory measures). In the technicians' perceptions, the risk is inherent to technical failures and can be reduced. For citizens, the concern is more for economics and personal goods losses. However both types of actors deal with the matter of submerged territories as a problem of institutional inertia (lack of financial resource, problem of governance). The second part presents the crisis management in these areas. We explain how various actors cope with flood when the risk occurs. The analysis of the actors' reaction to the flood event contributes (1) to further characterise the social and political system dealing with the flooding risk and, (2) to assess the adaptive capacities of the technicians to the risk. The crisis moment gives a specific role for each actor of the social, political and technical systems. Technical actors manage natural hazard through the remote control system and their major concern is for network disruption. Once flood has occurred, they may assist residents cleaning out public space. Nonetheless, after the crisis, the technical actors are seen by the others as the responsible for the flood. They are considered as the ones in charge of preventing the future flood event, even if they claim that they cannot protect urban areas and population up to a determined risk threshold. Neither technicians nor other actor settle the question of urban planning or existing vulnerability of the flooded areas.
International Space Station ECLSS Technical Task Agreement Summary Report
NASA Technical Reports Server (NTRS)
Ray, C. D. (Compiler); Salyer, B. H. (Compiler)
1999-01-01
This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.
Mattioli, Girolamo; Avanzini, Stefano; Pio, Luca; Costanzo, Sara; Faticato, Maria Grazia; Montobbio, Giovanni; Disma, Nicola; Buffa, Piero
2015-10-01
This study presents a technical report of a standardized approach to the perinephric area in a series of pediatric patients, demonstrating that whatever renal or suprarenal surgery is planned, this can be approached and accomplished laparoscopically with an identical or very similar port triangulation, thus facilitating the learning curve within the same surgical team. All patients undergoing renal and adrenal gland surgery with a minimally invasive approach in the period from October 2008 to November 2013 were retrospectively reviewed and included in the study. Technical details and clinical outcomes are described. In total, 68 patients matched the inclusion criteria and were therefore retrospectively examined. No major intraoperative complication occurred. Two patients developed recurrent pelvic-ureteric junction obstruction and were managed with double J stent positioning and laparoscopic dismembered pyeloplasty, respectively. Two patients presenting with adrenal mass experienced a moderate bleeding that could be treated conservatively. Thanks to the reproducibility of the procedure and on the grounds of the presented experience, we support the proposal that the transperitoneal laparoscopic approach to the kidney and the adrenal gland could represent a relatively easy and safe way to quickly achieve confidence and skill in the management of related diseases.
The Medicare Health Outcomes Survey program: overview, context, and near-term prospects.
Jones, Nathaniel; Jones, Stephanie L; Miller, Nancy A
2004-07-12
In 1996, the Centers for Medicare & Medicaid Services (CMS) initiated the Medicare Health Outcomes Survey (HOS). It is the first national survey to measure the quality of life and functional health status of Medicare beneficiaries enrolled in managed care. The program seeks to gather valid and reliable health status data in Medicare managed care for use in quality improvement activities, public reporting, plan accountability and improving health outcomes based on competition. The context that led to the development of the HOS was formed by the convergence of the following factors: 1) a recognized need to monitor the performance of managed care plans, 2) technical expertise and advancement in the areas of quality measurement and health outcomes assessment, 3) the existence of a tested functional health status assessment tool (SF-36)1, which was valid for an elderly population, 4) CMS leadership, and 5) political interest in quality improvement. Since 1998, there have been six baseline surveys and four follow up surveys. CMS, working with its partners, performs the following tasks as part of the HOS program: 1) Supports the technical/scientific development of the HOS measure, 2) Certifies survey vendors, 3) Collects Health Plan Employer Data and Information Set(HEDIS)2 HOS data, 4) Cleans, scores, and disseminates annual rounds of HOS data, public use files and reports to CMS, Quality Improvement Organizations (QIOs), Medicare+Choice Organizations (M+COs), and other stakeholders, 5) Trains M+COs and QIOs in the use of functional status measures and best practices for improving care, 6) Provides technical assistance to CMS, QIOs, M+COs and other data users, and 7) Conducts analyses using HOS data to support CMS and HHS priorities.CMS has recently sponsored an evaluation of the HOS program, which will provide the information necessary to enhance the future administration of the program. Information collected to date reveals that the HOS program is a valuable tool that provides a rich set of data that is useful for quality monitoring and improvement efforts. To enhance the future of the HOS program, many stakeholders recommend the implementation of incentives to encourage the use of the data, while others identify the need to monitor the health status of plan disenrollees.Overall, the HOS program represents an important vehicle for collecting outcomes data from Medicare beneficiaries. The new Medicare Prescription Drug, Improvement, and Modernization Act (2003) mandates the collection and use of data for outcomes measurement. Consequently, it is important to improve HOS to most effectively meet the mandate.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dragolici, F.; Turcanu, C. N.; Rotarescu, G.
2003-02-25
The proper application of the nuclear techniques and technologies in Romania started in 1957, once with the commissioning of the Research Reactor VVR-S from IFIN-HH-Magurele. During the last 45 years, appear thousands of nuclear application units with extremely diverse profiles (research, biology, medicine, education, agriculture, transport, all types of industry) which used different nuclear facilities containing radioactive sources and generating a great variety of radioactive waste during the decommissioning after the operation lifetime is accomplished. A new aspect appears by the planning of VVR-S Research Reactor decommissioning which will be a new source of radioactive waste generated by decontamination, disassemblingmore » and demolition activities. By construction and exploitation of the Radioactive Waste Treatment Plant (STDR)--Magurele and the National Repository for Low and Intermediate Radioactive Waste (DNDR)--Baita, Bihor county, in Romania was solved the management of radioactive wastes arising from operation and decommissioning of small nuclear facilities, being assured the protection of the people and environment. The present paper makes a review of the present technical status of the Romanian waste management facilities, especially raising on treatment capabilities of ''problem'' wastes such as Ra-266, Pu-238, Am-241 Co-60, Co-57, Sr-90, Cs-137 sealed sources from industrial, research and medical applications. Also, contain a preliminary estimation of quantities and types of wastes, which would result during the decommissioning project of the VVR-S Research Reactor from IFIN-HH giving attention to some special category of wastes like aluminum, graphite and equipment, components and structures that became radioactive through neutron activation. After analyzing the technical and scientific potential of STDR and DNDR to handle big amounts of wastes resulting from the decommissioning of VVR-S Research Reactor and small nuclear facilities, the necessity of up-gradation of these nuclear objectives before starting the decommissioning plan is revealed. A short presentation of the up-grading needs is also presented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.
The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less