Finance and supply management project execution plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.
Technologies for ECLSS Evolution
NASA Technical Reports Server (NTRS)
Diamant, Bryce L.
1990-01-01
Viewgraphs and discussion on technologies for Environmental Control and Life Support System (ECLSS) evolution are presented. Topics covered include: atmosphere revitalization including CO2 removal, CO2 reduction, O2 generation, and trace contaminant control; water recovery and management including urine processing, hygiene water processing, and potable water processing; and waste management. ECLSS technology schematics, process diagrams, and fluid interfaces are included.
TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook
1989-08-01
This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.
2006-06-01
research will cover an overview of business process engineering (BPR) and operation management . The focus will be on the basic process of BPR, inventory...management and improvement of the process of business operation management to appropriately provide a basic model for the Indonesian Air Force in...discuss the operation management aspects of inventory management and process improvement, including Economic Order Quantity, Material Requirement
Problem Solving Teams in a Total Quality Management Environment.
ERIC Educational Resources Information Center
Towler, Constance F.
1993-01-01
Outlines the problem-solving team training process used at Harvard University (Massachusetts), including the size and formation of teams, roles, and time commitment. Components of the process are explained, including introduction to Total Quality Management (TQM), customer satisfaction, meeting management, Parker Team Player Survey, interactive…
Quality data collection and management technology of aerospace complex product assembly process
NASA Astrophysics Data System (ADS)
Weng, Gang; Liu, Jianhua; He, Yongxi; Zhuang, Cunbo
2017-04-01
Aiming at solving problems of difficult management and poor traceability for discrete assembly process quality data, a data collection and management method is proposed which take the assembly process and BOM as the core. Data collection method base on workflow technology, data model base on BOM and quality traceability of assembly process is included in the method. Finally, assembly process quality data management system is developed and effective control and management of quality information for complex product assembly process is realized.
NASA Astrophysics Data System (ADS)
Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles
2015-04-01
In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.
7 Processes that Enable NASA Software Engineering Technologies: Value-Added Process Engineering
NASA Technical Reports Server (NTRS)
Housch, Helen; Godfrey, Sally
2011-01-01
The presentation reviews Agency process requirements and the purpose, benefits, and experiences or seven software engineering processes. The processes include: product integration, configuration management, verification, software assurance, measurement and analysis, requirements management, and planning and monitoring.
An Extensible Information Grid for Risk Management
NASA Technical Reports Server (NTRS)
Maluf, David A.; Bell, David G.
2003-01-01
This paper describes recent work on developing an extensible information grid for risk management at NASA - a RISK INFORMATION GRID. This grid is being developed by integrating information grid technology with risk management processes for a variety of risk related applications. To date, RISK GRID applications are being developed for three main NASA processes: risk management - a closed-loop iterative process for explicit risk management, program/project management - a proactive process that includes risk management, and mishap management - a feedback loop for learning from historical risks that escaped other processes. This is enabled through an architecture involving an extensible database, structuring information with XML, schemaless mapping of XML, and secure server-mediated communication using standard protocols.
The evolving science of hydrogeomorphology encompasses the interaction of water with landforms in time and space. This includes the processes of surface and mass erosion as well as the effects of land management. These hydrogeomorphic processes and management effects are examined...
Radwaste desk reference - Volume 3, Part 2: Liquid waste management. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deltete, D.; Fisher, S.; Kelly, J.J.
1994-05-01
EPRI began, in late in 1987, to produce a Radwaste Desk Reference that would allow each of the member utilities access to the available information and expertise on radwaste management. EPRI considers this important because radwaste management involves a wide variety of scientific and engineering disciplines. These include chemical and mechanical engineering, chemistry, and health physics. Radwaste management also plays a role in implementing a wide variety of regulatory requirements. These include plant-specific technical specifications, NRC standards for protection against radiation, DOT transportation regulations and major environmental legislation such as the Resource Conservation and Recovery Act. EPRI chose a questionmore » and answer format because it could be easily accessed by radwaste professionals with a variety of interests. The questions were generated at two meetings of utility radwaste professionals and EPRI contractors. Volume 1, which is already in publication, addresses dry active waste generation, processing and measurement. Volume 2 addresses low level waste storage, transportation and disposal. This volume, Volume 3, is being issued in two parts. Part 1 concentrates on the processing of liquid radioactive waste, whereas Part 2, included here, addresses liquid waste management. It includes extensive information and operating practices related to liquid waste generation and control, liquid waste processing systems at existing U.S. nuclear plants, processes for managing wet wastes (handling, dewatering, solidifying, processing, and packaging), and liquid waste measurement and analysis.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... management information system (MMIS) means a mechanized claims processing and information retrieval system—referred to as Medicaid Management Information Systems (MMIS)—that meets specified requirements and that... include claims processing and retrieval of utilization and management information necessary for program...
Kim, Kkotbong; Yang, Jinhyang
2017-06-01
After being diagnosed with breast cancer, women must make a number of decisions about their treatment and management. When the decision-making process among breast cancer patients is ineffective, it results in harm to their health. Little is known about the decision-making process of breast cancer patients during the entire course of treatment and management. We investigated women with breast cancer to explore the decision-making processes related to treatment and management. Eleven women participated, all of whom were receiving treatment or management in Korea. The average participant age was 43.5years. For data collection and analysis, a grounded theory methodology was used. Through constant comparative analyses, a core category emerged that we referred to as "finding the right individualized healthcare trajectory." The decision-making process occurred in four phases: turmoil, exploration, balance, and control. The turmoil phase included weighing the credibility of information and lowering the anxiety level. The exploration phase included assessing the expertise/promptness of medical treatment and evaluating the effectiveness of follow-up management. The balance phase included performing analyses from multiple angles and rediscovering value as a human being. The control phase included constructing an individualized management system and following prescribed and other management options. It is important to provide patients with accurate information related to the treatment and management of breast cancer so that they can make effective decisions. Healthcare providers should engage with patients on issues related to their disease, understand the burden placed on patients because of issues related to their sex, and ensure that the patient has a sufficient support system. The results of this study can be used to develop phase-specific, patient-centered, and tailored interventions for breast cancer patients. Copyright © 2017 Elsevier Inc. All rights reserved.
Strategic survey framework for the Northwest Forest Plan survey and manage program.
Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler
2003-01-01
This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...
Including information technology project management in the nursing informatics curriculum.
Sockolow, Paulina; Bowles, Kathryn H
2008-01-01
Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.
Management Challenges Fiscal Year 2016
2017-01-01
of Office of Inspector General Management Challenges 14 │ FY 2016 classified information revealed “methods to our adversaries that could impact our...electronic data to perform operations and to process, maintain, and report essential information . Office of Inspector General Management ...that collects, processes, stores, disseminates, and manages critical information . It includes owned and leased communications and computing
Visual management system and timber management application
Warren R. Bacon; Asa D. (Bud) Twombly
1979-01-01
This paper includes an illustration of a planning process to guide vegetation management throughout a travel route seen area and over the time period of a total management rotation (100-300 years). The process will produce direction on visual characteristics to be created and maintained within the biological potential and coordinated with associated re-source...
Multimedia environmental management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soesilo, J.A.; Wiley, W.D.
1999-09-01
This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; andmore » environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.« less
An Application of Business Process Management to Health Care Facilities.
Hassan, Mohsen M D
The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.
NASA Astrophysics Data System (ADS)
Huang, Hong-bin; Liu, Wei-ping; Chen, Shun-er; Zheng, Liming
2005-02-01
A new type of CATV network management system developed by universal MCU, which supports SNMP, is proposed in this paper. From the point of view in both hardware and software, the function and method of every modules inside the system, which include communications in the physical layer, protocol process, data process, and etc, are analyzed. In our design, the management system takes IP MAN as data transmission channel and every controlled object in the management structure has a SNMP agent. In the SNMP agent developed, there are four function modules, including physical layer communication module, protocol process module, internal data process module and MIB management module. In the paper, the structure and function of every module are designed and demonstrated while the related hardware circuit, software flow as well as the experimental results are tested. Furthermore, by introducing RTOS into the software programming, the universal MCU procedure can conducts such multi-thread management as fast Ethernet controller driving, TCP/IP process, serial port signal monitoring and so on, which greatly improves efficiency of CPU.
Engineering the Business of Defense Acquisition: An Analysis of Program Office Processes
2015-05-01
Information Technology and Business Process Redesign | MIT Sloan Management Review . MIT Sloan Management Review . Retrieved from http://sloanreview.mit.edu...links systems management to process execution Three Phases/ Multi-Year Effort (This Phase) Literature review Model development— Formal and...estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining
Adaptive management: Chapter 1
Allen, Craig R.; Garmestani, Ahjond S.; Allen, Craig R.; Garmestani, Ahjond S.
2015-01-01
Adaptive management is an approach to natural resource management that emphasizes learning through management where knowledge is incomplete, and when, despite inherent uncertainty, managers and policymakers must act. Unlike a traditional trial and error approach, adaptive management has explicit structure, including a careful elucidation of goals, identification of alternative management objectives and hypotheses of causation, and procedures for the collection of data followed by evaluation and reiteration. The process is iterative, and serves to reduce uncertainty, build knowledge and improve management over time in a goal-oriented and structured process.
Allen, Craig R.; Garmestani, Ahjond S.
2015-01-01
Adaptive management is an approach to natural resource management that emphasizes learning through management where knowledge is incomplete, and when, despite inherent uncertainty, managers and policymakers must act. Unlike a traditional trial and error approach, adaptive management has explicit structure, including a careful elucidation of goals, identification of alternative management objectives and hypotheses of causation, and procedures for the collection of data followed by evaluation and reiteration. The process is iterative, and serves to reduce uncertainty, build knowledge and improve management over time in a goal-oriented and structured process.
Busse, Jason W; Dolinschi, Roman; Clarke, Andrew; Scott, Liz; Hogg-Johnson, Sheilah; Amick, Benjamin C; Rivilis, Irina; Cole, Donald
2011-01-01
Return to work after a leave on disability is a common phenomenon, but little is known about the attitudes of employees or their supervisors towards the disability management process. We report on employee and supervisor feedback from one disability management experience. 389 consecutive employees from the Ontario offices of a single private Canadian insurance company returning to work from short-term disability, and their supervisors. We surveyed employees and their supervisors about their experience with, and attitudes towards, the disability management process. Of those surveyed, 88 employees and 75 supervisors provided data (response rates of 22.6% and 19.3% respectively). The majority of respondents (79.1% of employees and supervisors) endorsed positive attitudes towards their disability management experience. More than 25% of employees disagreed with the following three items: case managers contributed to recovery, case managers removed barriers to recovery, and sufficient support was provided in the return to work process. More than 25% of employees and managers reported that a commitment to modify an unhelpful work situation was not followed through. The majority of participating employees returning to work from short-term disability, and their supervisors, reported a high level of satisfaction with the disability management process. Areas that may benefit from attention include some aspects of case manager-employee interaction and ensuring that support during the return to work process is provided, including modification to work situations when appropriate.
Don't break the chain: importance of supply chain management in the operating room setting.
Bilyk, Candis
2008-09-01
Management of supplies within the operating room (OR) has considerable implications for decreasing healthcare costs while maintaining high-quality patient care. This area of healthcare therefore requires more monitoring by end-users including OR management, physicians, and nursing staff. This article is based on understanding supply chain management in the OR setting. Information provided throughout the article can be applied to small or large health care centers. It defines supply chain management and contains a brief overview of supply chain processes. It reviews the benefits of following these processes. The article also includes recommendations for improving the supply chain in the OR.
Managing internode data communications for an uninitialized process in a parallel computer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Archer, Charles J; Blocksome, Michael A; Miller, Douglas R
2014-05-20
A parallel computer includes nodes, each having main memory and a messaging unit (MU). Each MU includes computer memory, which in turn includes, MU message buffers. Each MU message buffer is associated with an uninitialized process on the compute node. In the parallel computer, managing internode data communications for an uninitialized process includes: receiving, by an MU of a compute node, one or more data communications messages in an MU message buffer associated with an uninitialized process on the compute node; determining, by an application agent, that the MU message buffer associated with the uninitialized process is full prior tomore » initialization of the uninitialized process; establishing, by the application agent, a temporary message buffer for the uninitialized process in main computer memory; and moving, by the application agent, data communications messages from the MU message buffer associated with the uninitialized process to the temporary message buffer in main computer memory.« less
Managing internode data communications for an uninitialized process in a parallel computer
Archer, Charles J; Blocksome, Michael A; Miller, Douglas R; Parker, Jeffrey J; Ratterman, Joseph D; Smith, Brian E
2014-05-20
A parallel computer includes nodes, each having main memory and a messaging unit (MU). Each MU includes computer memory, which in turn includes, MU message buffers. Each MU message buffer is associated with an uninitialized process on the compute node. In the parallel computer, managing internode data communications for an uninitialized process includes: receiving, by an MU of a compute node, one or more data communications messages in an MU message buffer associated with an uninitialized process on the compute node; determining, by an application agent, that the MU message buffer associated with the uninitialized process is full prior to initialization of the uninitialized process; establishing, by the application agent, a temporary message buffer for the uninitialized process in main computer memory; and moving, by the application agent, data communications messages from the MU message buffer associated with the uninitialized process to the temporary message buffer in main computer memory.
A conceptual persistent healthcare quality improvement process for software development management.
Lin, Jen-Chiun; Su, Mei-Ju; Cheng, Po-Hsun; Weng, Yung-Chien; Chen, Sao-Jie; Lai, Jin-Shin; Lai, Feipei
2007-01-01
This paper illustrates a sustained conceptual service quality improvement process for the management of software development within a healthcare enterprise. Our proposed process is revised from Niland's healthcare quality information system (HQIS). This process includes functions to survey the satisfaction of system functions, describe the operation bylaws on-line, and provide on-demand training. To achieve these goals, we integrate five information systems in National Taiwan University Hospital, including healthcare information systems, health quality information system, requirement management system, executive information system, and digital learning system, to form a full Deming cycle. A preliminary user satisfaction survey showed that our outpatient information system scored an average of 71.31 in 2006.
Laadan, Oren; Nieh, Jason; Phung, Dan
2012-10-02
Methods, media and systems for managing a distributed application running in a plurality of digital processing devices are provided. In some embodiments, a method includes running one or more processes associated with the distributed application in virtualized operating system environments on a plurality of digital processing devices, suspending the one or more processes, and saving network state information relating to network connections among the one or more processes. The method further include storing process information relating to the one or more processes, recreating the network connections using the saved network state information, and restarting the one or more processes using the stored process information.
Synthesis of an integrated cockpit management system
NASA Technical Reports Server (NTRS)
Dasaro, J. A.; Elliott, C. T.
1982-01-01
The process used in the synthesis of an integrated cockpit management system was discussed. Areas covered included flight displays, subsystem management, checklists, and procedures (both normal and emergency). The process of evolving from the unintegrated conventional system to the integrated system is examined and a brief description of the results presented.
Managing Automation: A Process, Not a Project.
ERIC Educational Resources Information Center
Hoffmann, Ellen
1988-01-01
Discussion of issues in management of library automation includes: (1) hardware, including systems growth and contracts; (2) software changes, vendor relations, local systems, and microcomputer software; (3) item and authority databases; (4) automation and library staff, organizational structure, and managing change; and (5) environmental issues,…
Participation process and outcome interactions: Exploring participation in water resource management
NASA Astrophysics Data System (ADS)
Carr, G.; Loucks, D. P.; Blöschl, G.
2012-04-01
Evaluating participation programmes, projects and activities aids understanding of effective mechanisms and enables the identification of improvements to current strategies. Characteristics of participation processes, such whether the process is cost effective, adequately facilitated, accessible, includes a representative section of society or interest groups and allocates power equivalently between participants, are commonly described and evaluated in the literature. A key question concerns whether effective processes lead to desirable outcomes. Two types of outcomes can be identified from participation programmes - tangible and non-tangible. Tangible outcomes include resource management changes or resource quality changes. Non tangible outcomes include developing and strengthening communication and action networks, building trust between individuals and/or organisations, developing innovative solutions, or developing shared knowledge and understandings of issues. To better understand how participation impacts upon resource management it is necessary to identify i) how non-tangible outcomes lead to resource management outcomes and ii) which characteristics of the participation process are connected to achieving non-tangible outcomes. This has been attempted with a literature based meta-analysis. Literature has been analysed to identify outcomes from participations programmes, and the process characteristics present that are associated with promoting or inhibiting their achievement. Preliminary analysis shows that process characteristics such as representation, facilitation and accessibility are important for achieving non-tangible outcomes. The relationship between non-tangible outcomes and resource management outcomes is less clear in the literature. This may be due to the different timescales over which the different types of outcomes emerge (resource management outcomes emerge over longer time periods) and the different contexts or settings in which participation takes place.
41 CFR 102-38.140 - What must we include in the public notice on sale of personal property?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What must we include in... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Advertising § 102-38.140 What must we...
41 CFR 102-38.140 - What must we include in the public notice on sale of personal property?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What must we include in... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Advertising § 102-38.140 What must we...
41 CFR 102-38.140 - What must we include in the public notice on sale of personal property?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What must we include in... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Advertising § 102-38.140 What must we...
41 CFR 102-38.140 - What must we include in the public notice on sale of personal property?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What must we include in... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Advertising § 102-38.140 What must we...
41 CFR 102-38.140 - What must we include in the public notice on sale of personal property?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What must we include in... Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL PROPERTY Sales Process Advertising § 102-38.140 What must we...
[Does clinical risk management require a structured conflict management?].
Neumann, Stefan
2015-01-01
A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.
College & University Business Administration. Third Edition.
ERIC Educational Resources Information Center
National Association of College and University Business Officers, Washington, DC.
This text presents indepth coverage of five areas of college and university business administration, including administrative management, business management, fiscal management, and financial accounting and reporting. The section on administrative management encompasses institutional planning, management information systems and data processing,…
An adaptive management process for forest soil conservation.
Michael P. Curran; Douglas G. Maynard; Ronald L. Heninger; Thomas A. Terry; Steven W. Howes; Douglas M. Stone; Thomas Niemann; Richard E. Miller; Robert F. Powers
2005-01-01
Soil disturbance guidelines should be based on comparable disturbance categories adapted to specific local soil conditions, validated by monitoring and research. Guidelines, standards, and practices should be continually improved based on an adaptive management process, which is presented in this paper. Core components of this process include: reliable monitoring...
ERIC Educational Resources Information Center
Milwaukee Area Technical Coll., WI.
A study was conducted to develop a curriculum to meet the information processing/management training needs of persons entering or continuing careers in the information marketing area. The process used for the study was based on Stufflebeam's Context, Input, Process, Product (CIPP) model of evaluation. The information gathering process included a…
The Perfect Marriage: Integrated Word Processing and Data Base Management Programs.
ERIC Educational Resources Information Center
Pogrow, Stanley
1983-01-01
Discussion of database integration and how it operates includes recommendations on compatible brand name word processing and database management programs, and a checklist for evaluating essential and desirable features of the available programs. (MBR)
Integrated management of thesis using clustering method
NASA Astrophysics Data System (ADS)
Astuti, Indah Fitri; Cahyadi, Dedy
2017-02-01
Thesis is one of major requirements for student in pursuing their bachelor degree. In fact, finishing the thesis involves a long process including consultation, writing manuscript, conducting the chosen method, seminar scheduling, searching for references, and appraisal process by the board of mentors and examiners. Unfortunately, most of students find it hard to match all the lecturers' free time to sit together in a seminar room in order to examine the thesis. Therefore, seminar scheduling process should be on the top of priority to be solved. Manual mechanism for this task no longer fulfills the need. People in campus including students, staffs, and lecturers demand a system in which all the stakeholders can interact each other and manage the thesis process without conflicting their timetable. A branch of computer science named Management Information System (MIS) could be a breakthrough in dealing with thesis management. This research conduct a method called clustering to distinguish certain categories using mathematics formulas. A system then be developed along with the method to create a well-managed tool in providing some main facilities such as seminar scheduling, consultation and review process, thesis approval, assessment process, and also a reliable database of thesis. The database plays an important role in present and future purposes.
NASA Technical Reports Server (NTRS)
1979-01-01
The functions performed by the systems management (SM) application software are described along with the design employed to accomplish these functions. The operational sequences (OPS) control segments and the cyclic processes they control are defined. The SM specialist function control (SPEC) segments and the display controlled 'on-demand' processes that are invoked by either an OPS or SPEC control segment as a direct result of an item entry to a display are included. Each processing element in the SM application is described including an input/output table and a structured control flow diagram. The flow through the module and other information pertinent to that process and its interfaces to other processes are included.
Design distributed simulation platform for vehicle management system
NASA Astrophysics Data System (ADS)
Wen, Zhaodong; Wang, Zhanlin; Qiu, Lihua
2006-11-01
Next generation military aircraft requires the airborne management system high performance. General modules, data integration, high speed data bus and so on are needed to share and manage information of the subsystems efficiently. The subsystems include flight control system, propulsion system, hydraulic power system, environmental control system, fuel management system, electrical power system and so on. The unattached or mixed architecture is changed to integrated architecture. That means the whole airborne system is regarded into one system to manage. So the physical devices are distributed but the system information is integrated and shared. The process function of each subsystem are integrated (including general process modules, dynamic reconfiguration), furthermore, the sensors and the signal processing functions are shared. On the other hand, it is a foundation for power shared. Establish a distributed vehicle management system using 1553B bus and distributed processors which can provide a validation platform for the research of airborne system integrated management. This paper establishes the Vehicle Management System (VMS) simulation platform. Discuss the software and hardware configuration and analyze the communication and fault-tolerant method.
What is the Right RFID for Your Process?
2006-04-30
chain efficiency at the US Department of Defense (DoD) and at major retailers such as Wal-Mart, Tesco and others has prompted these organizations...areas of expertise include global operations, supply- chain management, sustainable technologies, product stewardship, reverse logistics and...time MBA programs. Areas of Apte’s research interests include managing service operations, supply- chain management, technology management, and
NASA Astrophysics Data System (ADS)
The effective integration of processes, systems, and procedures used in the production of aerospace systems using computer technology is managed by the Integration Technology Division (MTI). Under its auspices are the Information Management Branch, which is actively involved with information management, information sciences and integration, and the Implementation Branch, whose technology areas include computer integrated manufacturing, engineering design, operations research, and material handling and assembly. The Integration Technology Division combines design, manufacturing, and supportability functions within the same organization. The Processing and Fabrication Division manages programs to improve structural and nonstructural materials processing and fabrication. Within this division, the Metals Branch directs the manufacturing methods program for metals and metal matrix composites processing and fabrication. The Nonmetals Branch directs the manufacturing methods programs, which include all manufacturing processes for producing and utilizing propellants, plastics, resins, fibers, composites, fluid elastomers, ceramics, glasses, and coatings. The objective of the Industrial Base Analysis Division is to act as focal point for the USAF industrial base program for productivity, responsiveness, and preparedness planning.
Managing for climate change on protected areas: An adaptive management decision making framework.
Tanner-McAllister, Sherri L; Rhodes, Jonathan; Hockings, Marc
2017-12-15
Current protected area management is becoming more challenging with advancing climate change and current park management techniques may not be adequate to adapt for effective management into the future. The framework presented here provides an adaptive management decision making process to assist protected area managers with adapting on-park management to climate change. The framework sets out a 4 step process. One, a good understanding of the park's context within climate change. Secondly, a thorough understanding of the park management systems including governance, planning and management systems. Thirdly, a series of management options set out as an accept/prevent change style structure, including a systematic assessment of those options. The adaptive approaches are defined as acceptance of anthropogenic climate change impact and attempt to adapt to a new climatic environment or prevention of change and attempt to maintain current systems under new climatic variations. Last, implementation and monitoring of long term trends in response to ecological responses to management interventions and assessing management effectiveness. The framework addresses many issues currently with park management in dealing with climate change including the considerable amount of research focussing on 'off-reserve' strategies, and threats and stress focused in situ park management. Copyright © 2017 Elsevier Ltd. All rights reserved.
Exploitation and Benefits of BIM in Construction Project Management
NASA Astrophysics Data System (ADS)
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
23 CFR 450.320 - Congestion management process in transportation management areas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... travel demand reduction and operational management strategies. (b) The development of a congestion... appropriate analysis of reasonable (including multimodal) travel demand reduction and operational management... the analysis demonstrates that travel demand reduction and operational management strategies cannot...
NASA Technical Reports Server (NTRS)
Perera, Jeevan S.
2013-01-01
Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.
Implementing Lean Six Sigma to achieve inventory control in supply chain management
NASA Astrophysics Data System (ADS)
Hong, Chen
2017-11-01
The inventory cost has important impact on the production cost. In order to get the maximum circulation of funds of enterprise with minimum inventory cost, the inventory control with Lean Six Sigma is presented in supply chain management. The inventory includes both the raw material and the semi-finished parts in manufacturing process. Though the inventory is often studied, the inventory control in manufacturing process is seldom mentioned. This paper reports the inventory control from the perspective of manufacturing process by using statistical techniques including DMAIC, Control Chart, and Statistical Process Control. The process stability is evaluated and the process capability is verified with Lean Six Sigma philosophy. The demonstration in power meter production shows the inventory is decreased from 25% to 0.4%, which indicates the inventory control can be achieved with Lean Six Sigma philosophy and the inventory cost in production can be saved for future sustainable development in supply chain management.
43 CFR 2804.21 - What other factors will BLM consider in determining processing and monitoring fees?
Code of Federal Regulations, 2012 CFR
2012-10-01
... Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) RIGHTS-OF-WAY UNDER THE FEDERAL LAND POLICY MANAGEMENT ACT Applying for FLPMA Grants § 2804... factors. If you include this information in your application, in arriving at your processing or monitoring...
43 CFR 2804.21 - What other factors will BLM consider in determining processing and monitoring fees?
Code of Federal Regulations, 2013 CFR
2013-10-01
... Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) RIGHTS-OF-WAY UNDER THE FEDERAL LAND POLICY MANAGEMENT ACT Applying for FLPMA Grants § 2804... factors. If you include this information in your application, in arriving at your processing or monitoring...
43 CFR 2804.21 - What other factors will BLM consider in determining processing and monitoring fees?
Code of Federal Regulations, 2014 CFR
2014-10-01
... Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) RIGHTS-OF-WAY UNDER THE FEDERAL LAND POLICY MANAGEMENT ACT Applying for FLPMA Grants § 2804... factors. If you include this information in your application, in arriving at your processing or monitoring...
43 CFR 2804.21 - What other factors will BLM consider in determining processing and monitoring fees?
Code of Federal Regulations, 2011 CFR
2011-10-01
... Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) RIGHTS-OF-WAY UNDER THE FEDERAL LAND POLICY MANAGEMENT ACT Applying for FLPMA Grants § 2804... factors. If you include this information in your application, in arriving at your processing or monitoring...
Strategic Information Resources Management: Fundamental Practices.
ERIC Educational Resources Information Center
Caudle, Sharon L.
1996-01-01
Discusses six fundamental information resources management (IRM) practices in successful organizations that can improve government service delivery performance. Highlights include directing changes, integrating IRM decision making into a strategic management process, performance management, maintaining an investment philosophy, using business…
Risk Management for the International Space Station
NASA Technical Reports Server (NTRS)
Sebastian, J.; Brezovic, Philip
2002-01-01
The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.
Information Security Management (ISM)
NASA Astrophysics Data System (ADS)
Šalgovičová, Jarmila; Prajová, Vanessa
2012-12-01
Currently, all organizations have to tackle the issue of information security. The paper deals with various aspects of Information Security Management (ISM), including procedures, processes, organizational structures, policies and control processes. Introduction of Information Security Management should be a strategic decision. The concept and implementation of Information Security Management in an organization are determined by the corporate needs and objectives, security requirements, the processes deployed as well as the size and structure of the organization. The implementation of ISM should be carried out to the extent consistent with the needs of the organization.
Innovation Process Design: A Change Management and Innovation Dimension Perspective
NASA Astrophysics Data System (ADS)
Peisl, Thomas; Reger, Veronika; Schmied, Juergen
The authors propose an innovative approach to the management of innovation integrating business, process, and maturity dimensions. Core element of the concept is the adaptation of ISO/IEC 15504 to the innovation process including 14 innovation drivers. Two managerial models are applied to conceptualize and visualize the respective innovation strategies, the Balanced Scorecard and a Barriers in Change Processes Model. An illustrative case study shows a practical implementation process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management.
RMP Guidance for Warehouses - Chapter 5: Management System
Your management system should oversee the implementation of the risk management program elements, and designate and assign responsibility in order to make process safety a constant priority. Includes sample documentation.
Reengineering outcomes management: an integrated approach to managing data, systems, and processes.
Neuman, K; Malloch, K; Ruetten, V
1999-01-01
The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.
50 CFR 600.235 - Financial disclosure.
Code of Federal Regulations, 2010 CFR
2010-10-01
....235 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC.... Council decision means approval of a fishery management plan (FMP) or FMP amendment (including any.... Financial interest in harvesting, processing, or marketing (1) includes: (i) Stock, equity, or other...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-12
... of performing the technical analysis, management assessment, and program evaluation tasks required to.... Analysis of elements of the review process (including the presubmission process, and investigational device... time to facilitate a more efficient process. This includes analysis of root causes for inefficiencies...
Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions
NASA Technical Reports Server (NTRS)
Carl, John G.
1973-01-01
This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.
NASA Astrophysics Data System (ADS)
Maksimov, N. V.; Tikhomirov, G. V.; Golitsyna, O. L.
2017-01-01
The main problems and circumstances that influence the processes of creating effective knowledge management systems were described. These problems particularly include high species diversity of instruments for knowledge representation, lack of adequate lingware, including formal representation of semantic relationships. For semantic data descriptions development a conceptual model of the subject area and a conceptual-lexical system should be designed on proposals of ISO-15926 standard. It is proposed to conduct an information integration of educational and production processes on the basis of information systems technologies. Integrated knowledge management system information environment combines both traditional information resources and specific information resources of subject domain including task context and implicit/tacit knowledge.
Nichols, J.D.; Runge, M.C.; Johnson, F.A.; Williams, B.K.; Schodde, Richard; Hannon, Susan; Scheiffarth, Gregor; Bairlein, Franz
2006-01-01
The history of North American waterfowl harvest management has been characterized by attempts to use population monitoring data to make informed harvest management decisions. Early attempts can be characterized as intuitive decision processes, and later efforts were guided increasingly by population models and associated predictions. In 1995, a formal adaptive management process was implemented, and annual decisions about duck harvest regulations in the United States are still based on this process. This formal decision process is designed to deal appropriately with the various forms of uncertainty that characterize management decisions, environmental uncertainty, structural uncertainty, partial controllability and partial observability. The key components of the process are (1) objectives, (2) potential management actions, (3) model(s) of population response to management actions, (4) credibility measures for these models, and (5) a monitoring program. The operation of this iterative process is described, and a brief history of a decade of its use is presented. Future challenges range from social and political issues such as appropriate objectives and management actions, to technical issues such as multispecies management, geographic allocation of harvest, and incorporation of actions that include habitat acquisition and management.
Management: A continuing literature survey with indexes, March 1976
NASA Technical Reports Server (NTRS)
1976-01-01
Management is a compilation of references to selected reports, journal articles, and other documents on the subject of management. This publication lists 368 documents originally announced in the 1975 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). It includes references on the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. It also includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.
The six critical attributes of the next generation of quality management software systems.
Clark, Kathleen
2011-07-01
Driven by both the need to meet regulatory requirements and a genuine desire to drive improved quality, quality management systems encompassing standard operating procedure, corrective and preventative actions and related processes have existed for many years, both in paper and electronic form. The impact of quality management systems on 'actual' quality, however, is often reported as far less than desired. A quality management software system that moves beyond formal forms-driven processes to include a true closed loop design, manage disparate processes across the enterprise, provide support for collaborative processes and deliver insight into the overall state of control has the potential to close the gap between simply accomplishing regulatory compliance and delivering measurable improvements in quality and efficiency.
Management Styles and Techniques: People.
ERIC Educational Resources Information Center
DeLoach, Marva L.; And Others
1987-01-01
Three articles discuss management of library technical processes personnel. The first article focuses on the employer employee relationship and communication; the second explores management trends, including participative decision making, personnel evaluation, management by objectives, and the collegial system; and the third focuses on the…
Cleanroom Software Engineering Reference Model. Version 1.0.
1996-11-01
teams. It also serves as a baseline for continued evolution of Cleanroom practice. The scope of the CRM is software management , specification...addition to project staff, participants include management , peer organization representatives, and customer representatives as appropriate for...2 Review the status of the process with management , the project team, peer groups, and the customer . These verification activities include
NASA Technical Reports Server (NTRS)
Perera, Jeevan S.
2011-01-01
Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.
Risk Management Issues - An Aerospace Perspective
NASA Technical Reports Server (NTRS)
Perera, Jeevan S.
2011-01-01
Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.
Protocol and practice in the adaptive management of waterfowl harvests
Johnson, F.; Williams, K.
1999-01-01
Waterfowl harvest management in North America, for all its success, historically has had several shortcomings, including a lack of well-defined objectives, a failure to account for uncertain management outcomes, and inefficient use of harvest regulations to understand the effects of management. To address these and other concerns, the U.S. Fish and Wildlife Service began implementation of adaptive harvest management in 1995. Harvest policies are now developed using a Markov decision process in which there is an explicit accounting for uncontrolled environmental variation, partial controllability of harvest, and structural uncertainty in waterfowl population dynamics. Current policies are passively adaptive, in the sense that any reduction in structural uncertainty is an unplanned by-product of the regulatory process. A generalization of the Markov decision process permits the calculation of optimal actively adaptive policies, but it is not yet clear how state-specific harvest actions differ between passive and active approaches. The Markov decision process also provides managers the ability to explore optimal levels of aggregation or "management scale" for regulating harvests in a system that exhibits high temporal, spatial, and organizational variability. Progress in institutionalizing adaptive harvest management has been remarkable, but some managers still perceive the process as a panacea, while failing to appreciate the challenges presented by this more explicit and methodical approach to harvest regulation. Technical hurdles include the need to develop better linkages between population processes and the dynamics of landscapes, and to model the dynamics of structural uncertainty in a more comprehensive fashion. From an institutional perspective, agreement on how to value and allocate harvests continues to be elusive, and there is some evidence that waterfowl managers have overestimated the importance of achievement-oriented factors in setting hunting regulations. Indeed, it is these unresolved value judgements, and the lack of an effective structure for organizing debate, that present the greatest threat to adaptive harvest management as a viable means for coping with management uncertainty. Copyright ?? 1999 by The Resilience Alliance.
NASA Astrophysics Data System (ADS)
Levchenko, N. G.; Glushkov, S. V.; Sobolevskaya, E. Yu; Orlov, A. P.
2018-05-01
The method of modeling the transport and logistics process using fuzzy neural network technologies has been considered. The analysis of the implemented fuzzy neural network model of the information management system of transnational multimodal transportation of the process showed the expediency of applying this method to the management of transport and logistics processes in the Arctic and Subarctic conditions. The modular architecture of this model can be expanded by incorporating additional modules, since the working conditions in the Arctic and the subarctic themselves will present more and more realistic tasks. The architecture allows increasing the information management system, without affecting the system or the method itself. The model has a wide range of application possibilities, including: analysis of the situation and behavior of interacting elements; dynamic monitoring and diagnostics of management processes; simulation of real events and processes; prediction and prevention of critical situations.
General RMP Guidance - Appendix D: OSHA Guidance on PSM
OSHA's Process Safety Management (PSM) Guidance on providing complete and accurate written information concerning process chemicals, process technology, and process equipment; including process hazard analysis and material safety data sheets.
Process Reengineering for Quality Improvement in ICU Based on Taylor's Management Theory.
Tao, Ziqi
2015-06-01
Using methods including questionnaire-based surveys and control analysis, we analyzed the improvements in the efficiency of ICU rescue, service quality, and patients' satisfaction, in Xuzhou Central Hospital after the implementation of fine management, with an attempt to further introduce the concept of fine management and implement the brand construction. Originating in Taylor's "Theory of Scientific Management" (1982), fine management uses programmed, standardized, digitalized, and informational approaches to ensure each unit of an organization is running with great accuracy, high efficiency, strong coordination, and at sustained duration (Wang et al., Fine Management, 2007). The nature of fine management is a process that breaks up the strategy and goal, and executes it. Strategic planning takes place at every part of the process. Fine management demonstrates that everybody has a role to play in the management process, every area must be examined through the management process, and everything has to be managed (Zhang et al., The Experience of Hospital Nursing Precise Management, 2006). In other words, this kind of management theory demands all people to be involved in the entire process (Liu and Chen, Med Inf, 2007). As public hospital reform is becoming more widespread, it becomes imperative to "build a unified and efficient public hospital management system" and "improve the quality of medical services" (Guidelines on the Pilot Reform of Public Hospitals, 2010). The execution of fine management is of importance in optimizing the medical process, improving medical services and building a prestigious hospital brand.
RMP Guidance for Chemical Distributors - Appendix D: OSHA Guidance on PSM
Guidance on the Process Safety Management standard says information (including MSDS) about chemicals, including process intermediates, must enable accurate assessment of fire/explosion characteristics, reactivity hazards, and corrosing/erosion effects.
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2012 CFR
2012-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2011 CFR
2011-10-01
... Application Processing and Information Retrieval System Guide. The initial advance automatic data processing... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
43 CFR 3935.10 - Accounting records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... processing plant and retort; (3) Mineral products produced and sold; (4) Shale oil products, shale gas, and... mined or processed and of all products including synthetic petroleum, shale oil, shale gas, and shale..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MANAGEMENT OF OIL SHALE EXPLORATION AND LEASES...
43 CFR 3935.10 - Accounting records.
Code of Federal Regulations, 2014 CFR
2014-10-01
... processing plant and retort; (3) Mineral products produced and sold; (4) Shale oil products, shale gas, and... mined or processed and of all products including synthetic petroleum, shale oil, shale gas, and shale..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MANAGEMENT OF OIL SHALE EXPLORATION AND LEASES...
43 CFR 3935.10 - Accounting records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... processing plant and retort; (3) Mineral products produced and sold; (4) Shale oil products, shale gas, and... mined or processed and of all products including synthetic petroleum, shale oil, shale gas, and shale..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MANAGEMENT OF OIL SHALE EXPLORATION AND LEASES...
Nurse-Managed Clinics: A Blueprint for Success Using the Covey Framework.
ERIC Educational Resources Information Center
Starck, Patricia L.; And Others
1995-01-01
Describes the process from inception to successful operation of a university-based, nurse-managed clinic, based on Covey's seven habits of highly effective people. Includes information on the planning process, financing, political strategies for gaining approval, and ongoing development of services. (JOW)
Stream dynamics: An overview for land managers
Burchard H. Heede
1980-01-01
Concepts of stream dynamics are demonstrated through discussion of processes and process indicators; theory is included only where helpful to explain concepts. Present knowledge allows only qualitative prediction of stream behavior. However, such predictions show how management actions will affect the stream and its environment.
ERIC Educational Resources Information Center
Natale, Joseph L.
This chapter of "Principles of School Business Management" discusses the effective management of purchasing processes in a school district. These processes include obtaining materials, supplies, and equipment of maximum value for the least expense, and receiving, storing, and distributing the items obtained. The chapter opens with an overview of…
Electronic Handbooks Simplify Process Management
NASA Technical Reports Server (NTRS)
2012-01-01
Getting a multitude of people to work together to manage processes across many organizations for example, flight projects, research, technologies, or data centers and others is not an easy task. Just ask Dr. Barry E. Jacobs, a research computer scientist at Goddard Space Flight Center. He helped NASA develop a process management solution that provided documenting tools for process developers and participants to help them quickly learn, adapt, test, and teach their views. Some of these tools included editable files for subprocess descriptions, document descriptions, role guidelines, manager worksheets, and references. First utilized for NASA's Headquarters Directives Management process, the approach led to the invention of a concept called the Electronic Handbook (EHB). This EHB concept was successfully applied to NASA's Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs, among other NASA programs. Several Federal agencies showed interest in the concept, so Jacobs and his team visited these agencies to show them how their specific processes could be managed by the methodology, as well as to create mockup versions of the EHBs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Management Systems: Good Practices for Development and Implementation.” 3 An effective SMS should include, at... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.108 SMS. An SMS is a systematic process with the goal of reducing the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Management Systems: Good Practices for Development and Implementation.” 3 An effective SMS should include, at... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.108 SMS. An SMS is a systematic process with the goal of reducing the...
MATRIS Indexing and Retrieval Thesaurus (MIRT): Definitions of Indexing Terms
1994-08-01
use strategies ; may include simple manual systems for personnel management. • Bgc Marginal manpower utilization The utilization of various types of...resources. Bgg Manpower management evaluation Evaluation process including manpower plans, strategies , methods of execution, and decision making with...specialties. I I I I I I I I I U I I I I 6 MANPOWER I I I RECRUITMENT I C RECRUITMENT Process involving developing requirements and strategies for
1994-05-01
LOGISTICS MANAGEMENT INSTITUTE An Approach for Meeting Customer Standards Under Executive Order 12862 Summary Executive Order 12862, Setting...search Centers all operate and manage wind tunnels for both NASA and indus- try customers . Nonetheless, a separate wind-tunnel process should be...could include the man- ager of the process, selected members of the manager’s staff, a key customer , and a survey expert. The manager and staff would
Evidence-based management - healthcare manager viewpoints.
Janati, Ali; Hasanpoor, Edris; Hajebrahimi, Sakineh; Sadeghi-Bazargani, Homayoun
2018-06-11
Purpose Hospital manager decisions can have a significant impact on service effectiveness and hospital success, so using an evidence-based approach can improve hospital management. The purpose of this paper is to identify evidence-based management (EBMgt) components and challenges. Consequently, the authors provide an improving evidence-based decision-making framework. Design/methodology/approach A total of 45 semi-structured interviews were conducted in 2016. The authors also established three focus group discussions with health service managers. Data analysis followed deductive qualitative analysis guidelines. Findings Four basic themes emerged from the interviews, including EBMgt evidence sources (including sub-themes: scientific and research evidence, facts and information, political-social development plans, managers' professional expertise and ethical-moral evidence); predictors (sub-themes: stakeholder values and expectations, functional behavior, knowledge, key competencies and skill, evidence sources, evidence levels, uses and benefits and government programs); EBMgt barriers (sub-themes: managers' personal characteristics, decision-making environment, training and research system and organizational issues); and evidence-based hospital management processes (sub-themes: asking, acquiring, appraising, aggregating, applying and assessing). Originality/value Findings suggest that most participants have positive EBMgt attitudes. A full evidence-based hospital manager is a person who uses all evidence sources in a six-step decision-making process. EBMgt frameworks are a good tool to manage healthcare organizations. The authors found factors affecting hospital EBMgt and identified six evidence sources that healthcare managers can use in evidence-based decision-making processes.
New Ideas on Facilities Management.
ERIC Educational Resources Information Center
Grimm, James C.
1986-01-01
Examines trends in facilities management relating to products and people. Reviews new trends in products, including processes, techniques, and programs that are being expounded by business and industry. Discusses the "people factors" involved in facilities management. (ABB)
Implementation of a pavement management system in Virginia.
DOT National Transportation Integrated Search
1987-01-01
The report summarizes the developments in pavement management in the Virginia Department of Transportation through late 1986. Included are discussions of the pavement management process with examples of priority programming, long-range projection of ...
5 CFR 294.107 - Places to obtain records.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Financial Officer Financial management. Director for Human Resources Development Training, education, and... 294.107 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS AVAILABILITY... Administration Administrative services; information management, including automated data processing; equal...
5 CFR 294.107 - Places to obtain records.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Financial Officer Financial management. Director for Human Resources Development Training, education, and... 294.107 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS AVAILABILITY... Administration Administrative services; information management, including automated data processing; equal...
5 CFR 294.107 - Places to obtain records.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Financial Officer Financial management. Director for Human Resources Development Training, education, and... 294.107 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS AVAILABILITY... Administration Administrative services; information management, including automated data processing; equal...
ALMA Array Operations Group process overview
NASA Astrophysics Data System (ADS)
Barrios, Emilio; Alarcon, Hector
2016-07-01
ALMA Science operations activities in Chile are responsibility of the Department of Science Operations, which consists of three groups, the Array Operations Group (AOG), the Program Management Group (PMG) and the Data Management Group (DMG). The AOG includes the Array Operators and have the mission to provide support for science observations, operating safely and efficiently the array. The poster describes the AOG process, management and operational tools.
The Careful Puppet Master: Reducing risk and fortifying acceptance testing with Jenkins CI
NASA Astrophysics Data System (ADS)
Smith, Jason A.; Richman, Gabriel; DeStefano, John; Pryor, James; Rao, Tejas; Strecker-Kellogg, William; Wong, Tony
2015-12-01
Centralized configuration management, including the use of automation tools such as Puppet, can greatly increase provisioning speed and efficiency when configuring new systems or making changes to existing systems, reduce duplication of work, and improve automated processes. However, centralized management also brings with it a level of inherent risk: a single change in just one file can quickly be pushed out to thousands of computers and, if that change is not properly and thoroughly tested and contains an error, could result in catastrophic damage to many services, potentially bringing an entire computer facility offline. Change management procedures can—and should—be formalized in order to prevent such accidents. However, like the configuration management process itself, if such procedures are not automated, they can be difficult to enforce strictly. Therefore, to reduce the risk of merging potentially harmful changes into our production Puppet environment, we have created an automated testing system, which includes the Jenkins CI tool, to manage our Puppet testing process. This system includes the proposed changes and runs Puppet on a pool of dozens of RedHat Enterprise Virtualization (RHEV) virtual machines (VMs) that replicate most of our important production services for the purpose of testing. This paper describes our automated test system and how it hooks into our production approval process for automatic acceptance testing. All pending changes that have been pushed to production must pass this validation process before they can be approved and merged into production.
43 CFR 3935.10 - Accounting records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... processing plant and retort; (3) Mineral products produced and sold; (4) Shale oil products, shale gas, and... mined or processed and of all products including synthetic petroleum, shale oil, shale gas, and shale..., DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) MANAGEMENT OF OIL SHALE EXPLORATION AND LEASES Production...
The Organizational Communication Consulting Spectrum.
ERIC Educational Resources Information Center
Tubbs, Stewart L.
Surveys of businesses and business managers indicate that developing communication skills within organizations is a priority. Communication consulting exists over a wide spectrum of activities that include guest speaking, conducting workshops, and conducting management training programs. These three processes can include a "canned program" that…
Land Use Management for Solid Waste Programs
ERIC Educational Resources Information Center
Brown, Sanford M., Jr.
1974-01-01
The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)
Askari, Marjan; Westerhof, Richard; Eslami, Saied; Medlock, Stephanie; de Rooij, Sophia E; Abu-Hanna, Ameen
2013-10-01
To propose a combined disease management and process modeling approach for evaluating and improving care processes, and demonstrate its usability and usefulness in a real-world fall management case study. We identified essential disease management related concepts and mapped them into explicit questions meant to expose areas for improvement in the respective care processes. We applied the disease management oriented questions to a process model of a comprehensive real world fall prevention and treatment program covering primary and secondary care. We relied on interviews and observations to complete the process models, which were captured in UML activity diagrams. A preliminary evaluation of the usability of our approach by gauging the experience of the modeler and an external validator was conducted, and the usefulness of the method was evaluated by gathering feedback from stakeholders at an invitational conference of 75 attendees. The process model of the fall management program was organized around the clinical tasks of case finding, risk profiling, decision making, coordination and interventions. Applying the disease management questions to the process models exposed weaknesses in the process including: absence of program ownership, under-detection of falls in primary care, and lack of efficient communication among stakeholders due to missing awareness about other stakeholders' workflow. The modelers experienced the approach as usable and the attendees of the invitational conference found the analysis results to be valid. The proposed disease management view of process modeling was usable and useful for systematically identifying areas of improvement in a fall management program. Although specifically applied to fall management, we believe our case study is characteristic of various disease management settings, suggesting the wider applicability of the approach. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.
Knowledge Management in Instructional Design. ERIC Digest.
ERIC Educational Resources Information Center
Spector, J. Michael; Edmonds, Gerald S.
This digest reviews what instructional designers do, describes knowledge management, and indicates how knowledge management is influencing instructional design. The first section defines instructional design (ID) and briefly describes the ID process. The second section covers knowledge management (KM), including definitions of KM and systems,…
Service Contract Compliance Management in Business Process Management
NASA Astrophysics Data System (ADS)
El Kharbili, Marwane; Pulvermueller, Elke
Compliance management is a critical concern for corporations, required to respect contracts. This concern is particularly relevant in the context of business process management (BPM) as this paradigm is getting adopted more widely for-designing and building IT systems. Enforcing contractual compliance needs to be modeled at different levels of a BPM framework, which also includes the service layer. In this paper, we discuss requirements and methods for modeling contractual compliance for an SOA-supported BPM. We also show how business rule management integrated into an industry BPM tool allows modeling and processing functional and non-functional-property constraints which may be extracted from business process contracts. This work proposes a framework that responds to the requirements identified and proposes an architecture implementing it. Our approach is also illustrated by an example.
A PBOM configuration and management method based on templates
NASA Astrophysics Data System (ADS)
Guo, Kai; Qiao, Lihong; Qie, Yifan
2018-03-01
The design of Process Bill of Materials (PBOM) holds a hinge position in the process of product development. The requirements of PBOM configuration design and management for complex products are analysed in this paper, which include the reuse technique of configuration procedure and urgent management need of huge quantity of product family PBOM data. Based on the analysis, the function framework of PBOM configuration and management has been established. Configuration templates and modules are defined in the framework to support the customization and the reuse of configuration process. The configuration process of a detection sensor PBOM is shown as an illustration case in the end. The rapid and agile PBOM configuration and management can be achieved utilizing template-based method, which has a vital significance to improve the development efficiency for complex products.
E-documentation as a process management tool for nursing care in hospitals.
Rajkovic, Uros; Sustersic, Olga; Rajkovic, Vladislav
2009-01-01
Appropriate documentation plays a key role in process management in nursing care. It includes holistic data management based on patient's data along the clinical path with regard to nursing care. We developed an e-documentation model that follows the process method of work in nursing care. It assesses the patient's status on the basis of Henderson's theoretical model of 14 basic living activities and is aligned with internationally recognized nursing classifications. E-documentation development requires reengineering of existing documentation and facilitates process reengineering. A prototype solution of an e-nursing documentation, already being in testing process at University medical centres in Ljubljana and Maribor, will be described.
Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN
NASA Technical Reports Server (NTRS)
Hall, Wayne
2011-01-01
Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.
NASA Technical Reports Server (NTRS)
Raiman, Laura B.
1992-01-01
Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .
NASA Astrophysics Data System (ADS)
Raiman, Laura B.
1992-12-01
Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .
Adaptive management for ecosystem services (j/a) | Science ...
Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with manage
Management: A continuing literature survey with indexes
NASA Technical Reports Server (NTRS)
1978-01-01
This bibliography lists 782 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1977. The citations, and abstracts when available, are reproduced exactly as they appeared originally in IAA and STAR, including the original accession numbers from the respective announcement journals. Topics cover the management of research and development contracts, production, logistics, personnel, safety, reliability and quality control citations. Includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.
DOT National Transportation Integrated Search
2009-04-01
The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...
Data management procedures for Tiepoint Registration, pre and post processing, and ICD116
NASA Technical Reports Server (NTRS)
Nowakowski, B. S.
1983-01-01
The data management procedures for tiepoint registration, pre and post processing, and "ICD116' are described. With each procedure description, the pertinent execs are listed and purposes defined. An example run of each of the 32 execs is included with user inputs identified.
Direct Loan Cash Management and Data Matching (Reconciliation).
ERIC Educational Resources Information Center
Department of Education, Washington, DC.
This guide for institutions of higher education and other schools receiving funds under the William D. Ford Direct Loan Program details required and recommended procedures for the reconciliation process. The reconciliation process is explained to include cash management (the accounting for Direct Loan funds drawn down and disbursed to borrowers)…
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
Configuration Management, Capacity Planning Decision Support, Modeling and Simulation
1988-12-01
flow includes both top-down and bottom-up requirements. The flow also includes hardware, software and transfer acquisition, installation, operation ... management and upgrade as required. Satisfaction of a users needs and requirements is a difficult and detailed process. The key assumptions at this
IEC 61511 and the capital project process--a protective management system approach.
Summers, Angela E
2006-03-17
This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.
Including policy and management in socio-hydrology models: initial conceptualizations
NASA Astrophysics Data System (ADS)
Hermans, Leon; Korbee, Dorien
2017-04-01
Socio-hydrology studies the interactions in coupled human-water systems. So far, the use of dynamic models that capture the direct feedback between societal and hydrological systems has been dominant. What has not yet been included with any particular emphasis, is the policy or management layer, which is a central element in for instance integrated water resources management (IWRM) or adaptive delta management (ADM). Studying the direct interactions between human-water systems generates knowledges that eventually helps influence these interactions in ways that may ensure better outcomes - for society and for the health and sustainability of water systems. This influence sometimes occurs through spontaneous emergence, uncoordinated by societal agents - private sector, citizens, consumers, water users. However, the term 'management' in IWRM and ADM also implies an additional coordinated attempt through various public actors. This contribution is a call to include the policy and management dimension more prominently into the research focus of the socio-hydrology field, and offers first conceptual variables that should be considered in attempts to include this policy or management layer in socio-hydrology models. This is done by drawing on existing frameworks to study policy processes throughout both planning and implementation phases. These include frameworks such as the advocacy coalition framework, collective learning and policy arrangements, which all emphasis longer-term dynamics and feedbacks between actor coalitions in strategic planning and implementation processes. A case about longter-term dynamics in the management of the Haringvliet in the Netherlands is used to illustrate the paper.
5 CFR 251.201 - Associations of management officials and/or supervisors.
Code of Federal Regulations, 2014 CFR
2014-01-01
.../or supervisors. 251.201 Section 251.201 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL... managers should be included in the decision-making process and notified of executive-level decisions on a... consultation with its supervisors and managers. Agencies must also establish consultative relationships with...
5 CFR 251.201 - Associations of management officials and/or supervisors.
Code of Federal Regulations, 2012 CFR
2012-01-01
.../or supervisors. 251.201 Section 251.201 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL... managers should be included in the decision-making process and notified of executive-level decisions on a... consultation with its supervisors and managers. Agencies must also establish consultative relationships with...
DOE Office of Scientific and Technical Information (OSTI.GOV)
ROOT, R.W.
1999-05-18
This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.
Use of multi-node wells in the Groundwater-Management Process of MODFLOW-2005 (GWM-2005)
Ahlfeld, David P.; Barlow, Paul M.
2013-01-01
Many groundwater wells are open to multiple aquifers or to multiple intervals within a single aquifer. These types of wells can be represented in numerical simulations of groundwater flow by use of the Multi-Node Well (MNW) Packages developed for the U.S. Geological Survey’s MODFLOW model. However, previous versions of the Groundwater-Management (GWM) Process for MODFLOW did not allow the use of multi-node wells in groundwater-management formulations. This report describes modifications to the MODFLOW–2005 version of the GWM Process (GWM–2005) to provide for such use with the MNW2 Package. Multi-node wells can be incorporated into a management formulation as flow-rate decision variables for which optimal withdrawal or injection rates will be determined as part of the GWM–2005 solution process. In addition, the heads within multi-node wells can be used as head-type state variables, and, in that capacity, be included in the objective function or constraint set of a management formulation. Simple head bounds also can be defined to constrain water levels at multi-node wells. The report provides instructions for including multi-node wells in the GWM–2005 data-input files and a sample problem that demonstrates use of multi-node wells in a typical groundwater-management problem.
Knowledge Management: An Introduction.
ERIC Educational Resources Information Center
Mac Morrow, Noreen
2001-01-01
Discusses issues related to knowledge management and organizational knowledge. Highlights include types of knowledge; the knowledge economy; intellectual capital; knowledge and learning organizations; knowledge management strategies and processes; organizational culture; the role of technology; measuring knowledge; and the role of the information…
NASA Technical Reports Server (NTRS)
Jellicorse, John J.; Rahman, Shamin A.
2016-01-01
NASA is currently developing the next generation crewed spacecraft and launch vehicle for exploration beyond earth orbit including returning to the Moon and making the transit to Mars. Managing the design integration of major hardware elements of a space transportation system is critical for overcoming both the technical and programmatic challenges in taking a complex system from concept to space operations. An established method of accomplishing this is formal interface management. In this paper we set forth an argument that the interface management process implemented by NASA between the Orion Multi-Purpose Crew Vehicle (MPCV) and the Space Launch System (SLS) achieves the Level 3 tier of the EIA 731.1 System Engineering Capability Model (SECM) for Generic Practices. We describe the relevant NASA systems and associated organizations, and define the EIA SECM Level 3 Generic Practices. We then provide evidence for our compliance with those practices. This evidence includes discussions of: NASA Systems Engineering Interface (SE) Management standard process and best practices; the tailoring of that process for implementation on the Orion to SLS interface; changes made over time to improve the tailored process, and; the opportunities to take the resulting lessons learned and propose improvements to our institutional processes and best practices. We compare this evidence against the practices to form the rationale for the declared SECM maturity level.
Designing a Digital Instructional Management System To Optimize Early Education.
ERIC Educational Resources Information Center
Mooij, Ton
2002-01-01
Discusses digital instructional management systems (DIMSs) and describes a pilot study conducted in two Dutch kindergartens with a prototype DIMS that included individualization and optimization, that is matching curriculum with learner characteristics. Topics include learning processes for children at risk; and future plans. (LRW)
Sens, Brigitte
2010-01-01
The concept of general process orientation as an instrument of organisation development is the core principle of quality management philosophy, i.e. the learning organisation. Accordingly, prestigious quality awards and certification systems focus on process configuration and continual improvement. In German health care organisations, particularly in hospitals, this general process orientation has not been widely implemented yet - despite enormous change dynamics and the requirements of both quality and economic efficiency of health care processes. But based on a consistent process architecture that considers key processes as well as management and support processes, the strategy of excellent health service provision including quality, safety and transparency can be realised in daily operative work. The core elements of quality (e.g., evidence-based medicine), patient safety and risk management, environmental management, health and safety at work can be embedded in daily health care processes as an integrated management system (the "all in one system" principle). Sustainable advantages and benefits for patients, staff, and the organisation will result: stable, high-quality, efficient, and indicator-based health care processes. Hospitals with their broad variety of complex health care procedures should now exploit the full potential of total process orientation. Copyright © 2010. Published by Elsevier GmbH.
Anatomy of a Security Operations Center
NASA Technical Reports Server (NTRS)
Wang, John
2010-01-01
Many agencies and corporations are either contemplating or in the process of building a cyber Security Operations Center (SOC). Those Agencies that have established SOCs are most likely working on major revisions or enhancements to existing capabilities. As principle developers of the NASA SOC; this Presenters' goals are to provide the GFIRST community with examples of some of the key building blocks of an Agency scale cyber Security Operations Center. This presentation viII include the inputs and outputs, the facilities or shell, as well as the internal components and the processes necessary to maintain the SOC's subsistence - in other words, the anatomy of a SOC. Details to be presented include the SOC architecture and its key components: Tier 1 Call Center, data entry, and incident triage; Tier 2 monitoring, incident handling and tracking; Tier 3 computer forensics, malware analysis, and reverse engineering; Incident Management System; Threat Management System; SOC Portal; Log Aggregation and Security Incident Management (SIM) systems; flow monitoring; IDS; etc. Specific processes and methodologies discussed include Incident States and associated Work Elements; the Incident Management Workflow Process; Cyber Threat Risk Assessment methodology; and Incident Taxonomy. The Evolution of the Cyber Security Operations Center viII be discussed; starting from reactive, to proactive, and finally to proactive. Finally, the resources necessary to establish an Agency scale SOC as well as the lessons learned in the process of standing up a SOC viII be presented.
Understanding and Managing the Assessment Process
Gene Lessard; Scott Archer; John R. Probst; Sandra Clark
1999-01-01
Taking an ecological approach to management, or ecosystem management, is a developing approach for managing natural resources within the context of large geogaphic scales and over multiple time frames. Recently, the Council on Environmental Quality (CEQ) (IEMTF 1995) defined an ecosystem as "...an interconnected community of living things, including humans, and...
Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Urban, Mary Elizabeth
Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less
Computers and Library Management.
ERIC Educational Resources Information Center
Cooke, Deborah M.; And Others
1985-01-01
This five-article section discusses changes in the management of the school library resulting from use of the computer. Topics covered include data management programs (record keeping, word processing, and bibliographies); practical applications of a database; evaluation of "Circulation Plus" software; ergonomics and computers; and…
77 FR 20871 - Audit and Financial Management Advisory (AFMAC)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-06
... Agency's financial management, including the financial reporting process, systems of internal controls... the meeting is to discuss the SBA's Financial Reporting, Audit Findings Remediation, Ongoing OIG... SMALL BUSINESS ADMINISTRATION Audit and Financial Management Advisory (AFMAC) AGENCY: U.S. Small...
Value-driven process management: using value to improve processes.
Melnyk, S A; Christensen, R T
2000-08-01
Every firm can be viewed as consisting of various processes. These processes affect everything that the firm does from accepting orders and designing products to scheduling production. In many firms, the management of processes often reflects considerations of efficiency (cost) rather than effectiveness (value). In this article, we introduce a well-structured process for managing processes that begins not with the process, but rather with the customer and the product and the concept of value. This process progresses through a number of steps which include issues such as defining value, generating the appropriate metrics, identifying the critical processes, mapping and assessing the performance of these processes, and identifying long- and short-term areas for action. What makes the approach presented in this article so powerful is that it explicitly links the customer to the process and that the process is evaluated in term of its ability to effectively serve the customers.
Ge Sun; Johnny Boggs; Steven G. McNulty; Devendra M. Amatya; Carl C. Trettin; Zhaohua Dai; James M. Vose; Ileana B. La Torre Torres; Timothy Callahan
2008-01-01
Understanding the hydrologic processes is the first step in making sound watershed management decisions including designing Best Management Practices for nonpoint source pollution control. Over the past fifty years, various forest experimental watersheds have been instrumented across the Carolinas through collaborative studies among federal, state, and private...
How To Build a Strategic Plan: A Step-by-Step Guide for School Managers.
ERIC Educational Resources Information Center
Clay, Katherine; And Others
Strategic planning techniques for administrators, with a focus on process managers, are presented in this guidebook. The three major tasks of the strategic planning process include the assessment of the current organizational situation, goal setting, and the development of strategies to accomplish this. Strategic planning differs from long-range…
ERIC Educational Resources Information Center
Cho, Sei Hyoung; Song, Ji Hoon; Yun, Suk Chun; Lee, Cheol Ki
2013-01-01
The primary purpose of this research is to examine the structural relationships among several workplace-related constructs, including strategic human resource management (HRM) practices, organizational learning processes, and performance improvement in the Korean business context. More specifically, the research examined the mediating effect of…
Integrating fire management into land management planning for west-side forests
Peter D. Teensma
1996-01-01
Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...
2012-01-01
307–308) define kaizen as “continuous, incremental improvement of an activity to create more value with less muda.” They define muda as “any activity...approaches, kaizen events, Six Sigma, total quality management (TQM) for continuous improvement, kaikaku,6 process reengineering for discontinuous...them fix problems and develop capabilities. These efforts may include kaizen (i.e., continuous, incremental improvement) events, process mapping, work
Management of local economic and ecological system of coal processing company
NASA Astrophysics Data System (ADS)
Kiseleva, T. V.; Mikhailov, V. G.; Karasev, V. A.
2016-10-01
The management issues of local ecological and economic system of coal processing company - coal processing plant - are considered in the article. The objectives of the research are the identification and the analysis of local ecological and economic system (coal processing company) performance and the proposals for improving the mechanism to support the management decision aimed at improving its environmental safety. The data on the structure of run-of-mine coal processing products are shown. The analysis of main ecological and economic indicators of coal processing enterprises, characterizing the state of its environmental safety, is done. The main result of the study is the development of proposals to improve the efficiency of local enterprise ecological and economic system management, including technical, technological and business measures. The results of the study can be recommended to industrial enterprises to improve their ecological and economic efficiency.
Field Impact Evaluation Process on Electronic Tabular Display Subsystem (ETABS).
1979-10-01
structural and process techniques are described. These include a diagonal slice approach to team formulation and several different methods of team building, process control and conflict management . (Author)
Ecosystem services as a common language for coastal ecosystem-based management.
Granek, Elise F; Polasky, Stephen; Kappel, Carrie V; Reed, Denise J; Stoms, David M; Koch, Evamaria W; Kennedy, Chris J; Cramer, Lori A; Hacker, Sally D; Barbier, Edward B; Aswani, Shankar; Ruckelshaus, Mary; Perillo, Gerardo M E; Silliman, Brian R; Muthiga, Nyawira; Bael, David; Wolanski, Eric
2010-02-01
Ecosystem-based management is logistically and politically challenging because ecosystems are inherently complex and management decisions affect a multitude of groups. Coastal ecosystems, which lie at the interface between marine and terrestrial ecosystems and provide an array of ecosystem services to different groups, aptly illustrate these challenges. Successful ecosystem-based management of coastal ecosystems requires incorporating scientific information and the knowledge and views of interested parties into the decision-making process. Estimating the provision of ecosystem services under alternative management schemes offers a systematic way to incorporate biogeophysical and socioeconomic information and the views of individuals and groups in the policy and management process. Employing ecosystem services as a common language to improve the process of ecosystem-based management presents both benefits and difficulties. Benefits include a transparent method for assessing trade-offs associated with management alternatives, a common set of facts and common currency on which to base negotiations, and improved communication among groups with competing interests or differing worldviews. Yet challenges to this approach remain, including predicting how human interventions will affect ecosystems, how such changes will affect the provision of ecosystem services, and how changes in service provision will affect the welfare of different groups in society. In a case study from Puget Sound, Washington, we illustrate the potential of applying ecosystem services as a common language for ecosystem-based management.
NPTool: Towards Scalability and Reliability of Business Process Management
NASA Astrophysics Data System (ADS)
Braghetto, Kelly Rosa; Ferreira, João Eduardo; Pu, Calton
Currently one important challenge in business process management is provide at the same time scalability and reliability of business process executions. This difficulty becomes more accentuated when the execution control assumes complex countless business processes. This work presents NavigationPlanTool (NPTool), a tool to control the execution of business processes. NPTool is supported by Navigation Plan Definition Language (NPDL), a language for business processes specification that uses process algebra as formal foundation. NPTool implements the NPDL language as a SQL extension. The main contribution of this paper is a description of the NPTool showing how the process algebra features combined with a relational database model can be used to provide a scalable and reliable control in the execution of business processes. The next steps of NPTool include reuse of control-flow patterns and support to data flow management.
Physiotherapists' experiences of the management of anterior cruciate ligament injuries.
von Aesch, Arlene V; Perry, Meredith; Sole, Gisela
2016-05-01
While extensive research has been reported for management of anterior cruciate ligament (ACL) injuries, variation in treatment by physiotherapists is evident. To explore physiotherapists' experiences regarding ACL injury rehabilitation and factors that influenced physiotherapists' decision making for ACL rehabilitation, and to elicit what research physiotherapists perceived would support their management of these patients. Qualitative study. Fifteen physiotherapists from six private clinics in New Zealand participated in semi-structured interviews. The interviews were recorded, transcribed verbatim and the general inductive approach was used to develop key themes. Participant's management strengths were evident by their intent and commitment to provide expert rehabilitation, using a biopsychosocial approach and evidence-informed practice. The lengthy management process (including prolonged rehabilitation and referral processes) and interprofessional disconnect concerned participants. Translational research was needed for clear directions for exercise prescription and milestones for return to sports and occupation following ACL injury. Participants provided a biopsychosocial and evidence-based approach to ACL injury management. Potential areas of improvement include simplifying the referral process and enhancing communication between physiotherapists and other health professionals. Future research should focus on clarifying areas of ACL rehabilitation uncertainty, or collating results in an accessible and usable format for clinical practice. Copyright © 2015 Elsevier Ltd. All rights reserved.
2000-11-22
This is a final rule amending the NASA FAR Supplement (NFS) to emphasize considerations of risk management, including safety, security (including information technology security), health, export control, and damage to the environment, within the acquisition process. This final rule addresses risk management within the context of acquisition planning, selecting sources, choosing contract type, structuring award fee incentives, administering contracts, and conducting contractor surveillance.
Case management information systems: how to put the pieces together now and beyond year 2000.
Matthews, Pamela
2002-01-01
The case management process is a critical management and operational component in the delivery of customer services across the patient care continuum. Case management has transcended time and will continue to be a viable infrastructure process for successful organizations in the future. A key component of the case management infrastructure is information systems and technology support. Case management challenges include effective deployment and use of systems and technology. As more sophisticated, integrated systems are made available, case managers can use these tools to continue to expand effectively beyond the patient's episodic event to provide greater levels of cradle-to-grave management of healthcare. This article explores methods for defining case management system needs and identifying automation options available to the case manager.
Adaptive management for ecosystem services.
Birgé, Hannah E; Allen, Craig R; Garmestani, Ahjond S; Pope, Kevin L
2016-12-01
Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with management designed to meet the demands of a growing human population. Copyright © 2016 Elsevier Ltd. All rights reserved.
Code of Federal Regulations, 2010 CFR
2010-07-01
... public funds. Overview will also include review of the State management process to ensure it is efficient... management of the wastewater treatment works construction grant program to the maximum extent possible consistent with the objectives of the Act, prudent fiscal management, and EPA's overall national...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2014 CFR
2014-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2012 CFR
2012-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2013 CFR
2013-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
10 CFR 1.31 - Office of the Chief Financial Officer.
Code of Federal Regulations, 2011 CFR
2011-01-01
... planning, budgeting, and performance management process; (f) Develops and maintains an integrated agency accounting and financial management system, including an accounting system, and financial reporting and...— (a) Oversees all financial management activities relating to NRC's programs and operations and...
Reinvention/reengineering of business and technical processes
NASA Technical Reports Server (NTRS)
Olsen, Eugene A.
1996-01-01
The changing marketplace as evidenced by global competition is requiring American organizations to rethink, regroup, and redesign their processes. The umbrella of total quality management (TQM) includes many quality methods, techniques, tools, and approaches. There is no right way for every situation or circumstance. Adaptability and experimentation of several tools is necessary. Process management when properly applied can lead to continuous quality improvements. But some processes simply need to be discarded and new ones developed. This reengineering often results in vertical compression and job redesign and restructuring. Work activities must be designed around processes, not processes around work activities. Reengineering and process management do not stand alone--they support each other. Senior executive leadership and empowerment of workers at all organizational levels is vital for both short-term and long-term success.
A leadership-management training curriculum for pathology residents.
Sims, K L; Darcy, T P
1997-07-01
Leadership and management skills are increasingly critical to the success of pathologists in and outside of academic centers. We describe a leadership and management curriculum in a combined anatomic and clinical pathology residency program. The mentor-based approach incorporates leadership and management skills throughout the residency with a dedicated 2-month rotation during the final year of training. This 2-month rotation is led by a senior faculty pathologist mentor and includes active participation in management activities, small group discussions, reading, and a management process project. The topics for the small group discussions, reading list, mentor-based activities, and completed management process projects are described. Outcomes and evaluations are reported for residents who have completed this curriculum in leadership and management.
7 CFR 3565.304 - Lender loan processing responsibilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., management and disposition. Unless otherwise permitted by the Agency, the originating lender must perform all loan functions during the period of the guarantee. These functions include servicing, asset management...
An Examination of the Construct Validity of the Inventory of Classroom Management Style.
ERIC Educational Resources Information Center
Martin, Nancy K.; Baldwin, Beatrice
Confirmatory factor analysis was used to examine the construct validity of a new instrument measuring perceptions toward classroom management: the Inventory of Classroom Management Style (ICMS). Classroom management was defined as a multifaceted process that includes three broad dimensions: (1) what teachers believe about students as persons; (2)…
23 CFR 630.1106 - Policy and procedures for work zone safety management.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Policy and procedures for work zone safety management... Policy and procedures for work zone safety management. (a) Each agency's policy and processes, procedures... established in accordance with 23 CFR 630.1006, shall include the consideration and management of road user...
Thresholds for conservation and management: structured decision making as a conceptual framework
Nichols, James D.; Eaton, Mitchell J.; Martin, Julien; Edited by Guntenspergen, Glenn R.
2014-01-01
changes in system dynamics. They are frequently incorporated into ecological models used to project system responses to management actions. Utility thresholds are components of management objectives and are values of state or performance variables at which small changes yield substantial changes in the value of the management outcome. Decision thresholds are values of system state variables at which small changes prompt changes in management actions in order to reach specified management objectives. Decision thresholds are derived from the other components of the decision process.We advocate a structured decision making (SDM) approach within which the following components are identified: objectives (possibly including utility thresholds), potential actions, models (possibly including ecological thresholds), monitoring program, and a solution algorithm (which produces decision thresholds). Adaptive resource management (ARM) is described as a special case of SDM developed for recurrent decision problems that are characterized by uncertainty. We believe that SDM, in general, and ARM, in particular, provide good approaches to conservation and management. Use of SDM and ARM also clarifies the distinct roles of ecological thresholds, utility thresholds, and decision thresholds in informed decision processes.
Pinto, Isabela Cardoso de Matos; Teixeira, Carmen Fontes
2011-09-01
The construction of Brazil's Unified National Health System (SUS) has raised a set of challenges for the health sector's administrators and personnel, including issues of work management and continuing education for health workers, in view of the financial, political, and organizational constraints in the process of changing the healthcare model. The current study aimed to analyze the process of formulating the Health Work and Education Management Policy by the Bahia State Health Department. Public policy cycle was used as the theoretical framework. The study analyzed data from institutional documents and records of participant observation by one of the authors. The results include mapping the governmental and nongovernmental stakeholders that participated in the process. The analysis highlights a series of problems in the SUS in Bahia related to work management and health workers' profile, taken as the point of departure for priority-setting in the State Strategic Agenda and Health Plan for 2008-2011.
Promoting quality: the health-care organization from a management perspective.
Glickman, Seth W; Baggett, Kelvin A; Krubert, Christopher G; Peterson, Eric D; Schulman, Kevin A
2007-12-01
Although agreement about the need for quality improvement in health care is almost universal, the means of achieving effective improvement in overall care is not well understood. Avedis Donabedian developed the structure-process-outcome framework in which to think about quality-improvement efforts. There is now a robust evidence-base in the quality-improvement literature on process and outcomes, but structure has received considerably less attention. The health-care field would benefit from expanding the current interpretation of structure to include broader perspectives on organizational attributes as primary determinants of process change and quality improvement. We highlight and discuss the following key elements of organizational attributes from a management perspective: (i) executive management, including senior leadership and board responsibilities (ii) culture, (iii) organizational design, (iv) incentive structures and (v) information management and technology. We discuss the relevant contributions from the business and medical literature for each element, and provide this framework as a roadmap for future research in an effort to develop the optimal definition of 'structure' for transforming quality-improvement initiatives.
NASA Astrophysics Data System (ADS)
Lyu, H.; Ni, G.; Sun, T.
2016-12-01
Urban stormwater management contributes to recover water cycle to a nearly natural situation. It is a challenge for analyzing the hydrologic performance in a watershed scale, since the measures are various of sorts and scales and work in different processes. A three processes framework is developed to simplify the urban hydrologic process on the surface and evaluate the urban stormwater management. The three processes include source utilization, transfer regulation and terminal detention, by which the stormwater is controlled in order or discharged. Methods for analyzing performance are based on the water controlled proportions by each process, which are calculated using USEPA Stormwater Management Model. A case study form Beijing is used to illustrate how the performance varies under a set of designed events of different return periods. This framework provides a method to assess urban stormwater management as a whole system considering the interaction between measures, and to examine if there is any weak process of an urban watershed to be improved. The results help to make better solutions of urban water crisis.
Beck, Susan L; Eaton, Linda H; Echeverria, Christina; Mooney, Kathi H
2017-10-01
SymptomCare@Home, an integrated symptom monitoring and management system, was designed as part of randomized clinical trials to help patients with cancer who receive chemotherapy in ambulatory clinics and often experience significant symptoms at home. An iterative design process was informed by chronic disease management theory and features of assessment and clinical decision support systems used in other diseases. Key stakeholders participated in the design process: nurse scientists, clinical experts, bioinformatics experts, and computer programmers. Especially important was input from end users, patients, and nurse practitioners participating in a series of studies testing the system. The system includes both a patient and clinician interface and fully integrates two electronic subsystems: a telephone computer-linked interactive voice response system and a Web-based Decision Support-Symptom Management System. Key features include (1) daily symptom monitoring, (2) self-management coaching, (3) alerting, and (4) nurse practitioner follow-up. The nurse practitioner is distinctively positioned to provide assessment, education, support, and pharmacologic and nonpharmacologic interventions to intensify management of poorly controlled symptoms at home. SymptomCare@Home is a model for providing telehealth. The system facilitates using evidence-based guidelines as part of a comprehensive symptom management approach. The design process and system features can be applied to other diseases and conditions.
NASA Technical Reports Server (NTRS)
Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.
1983-01-01
Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.
Attaining and maintaining data integrity with configuration management
NASA Astrophysics Data System (ADS)
Huffman, Dorothy J.; Jeane, Shirley A.
1993-08-01
Managers and scientists are concerned about data integrity because they draw conclusions from data that can have far reaching effects. Projects managers use Configuration Management to insure that hardware, software, and project information are controlled. They have not, as yet, applied its rigorously to data. However, there is ample opportunity in the data collection and production process to jeopardize data integrity. Environmental changes, tampering and production problems can all affect data integrity. There are four functions included in the Configuration Management process: configuration identification, control, auditing and status accounting. These functions provide management the means to attain data integrity and the visibility into engineering processes needed to maintain data integrity. When project managers apply Configuration Management processes to data, the data user can trace back through history to validate data integrity. The user knows that the project allowed only orderly changes to the data. He is assured that project personnel followed procedures to maintain data quality. He also has access to status information about the data. The user receives data products with a known integrity level and a means to assess the impact of past events ont he conclusions derived from the data. To obtain these benefits, project managers should apply the Configuration Management discipline to data.
Small Business Innovations (Automated Information)
NASA Technical Reports Server (NTRS)
1992-01-01
Bruce G. Jackson & Associates Document Director is an automated tool that combines word processing and database management technologies to offer the flexibility and convenience of text processing with the linking capability of database management. Originally developed for NASA, it provides a means to collect and manage information associated with requirements development. The software system was used by NASA in the design of the Assured Crew Return Vehicle, as well as by other government and commercial organizations including the Southwest Research Institute.
Project Management in Higher Education
ERIC Educational Resources Information Center
Alpert, Shannon Atkinson
2011-01-01
This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…
Defense Management Education and Training Catalog.
ERIC Educational Resources Information Center
Office of the Assistant Secretary of Defense for Manpower and Reserve Affairs (DOD), Washington, DC.
This catalog provides information on a wide variety of courses, programs, and school made available by Department of Defense organizations. The program consists of eighteen primarily service-operated schools offering joint training in management covering a wide variety of subjects including automatic data processing, production management,…
Process and Outcomes of School Nurse Case Management for Students with Asthma
ERIC Educational Resources Information Center
Engelke, Martha Keehner; Swanson, Melvin; Guttu, Martha
2014-01-01
There have been many studies that have examined the impact of school-based asthma programs on students with asthma. However, most studies do not provide adequate elaboration on the components of the program. Therefore, replication of these programs is difficult. This study examines the process of school nurse case management, which includes the…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-21
...-management process involving the Service, the Alaska Department of Fish and Game, and Alaska Native... developed under a co-management process involving the Service, the Alaska Department of Fish and Game, and... Fish and Game's request to expand the Fairbanks North Star Borough excluded area to include the Central...
Improving the claims process with EDI.
Moynihan, J J
1993-01-01
Electronic data interchange (EDI) is redefining the healthcare claims process. The traditional managerial approach to claims processing emphasizes information flow within the patient accounting department and between patient accounting and other departments. EDI enlarges the scope of the claims process to include information exchange between providers and payers. Using EDI to improve both external and internal information exchange makes the claims process more efficient and less expensive. This article is excerpted from "The Healthcare Financial Manager's Guide to Healthcare EDI," by James J. Moynihan, published by the Healthcare Financial Management Association.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... supply of services like or directly competitive with the customer relationship management and business... subject worker group includes workers involved in employment related to the supply of customer relationship management and business process outsourcing services. The subject worker group does not include on...
NASA Astrophysics Data System (ADS)
Adeleke, Adeyinka
The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to the decision-making process. Some recommendations for future studies were presented based on the need to intensify the importance of the current study and enlarge the body of knowledge regarding decision-making process in oil and gas industry.
Improving data collection processes for routine evaluation of treatment cost-effectiveness.
Monto, Sari; Penttilä, Riku; Kärri, Timo; Puolakka, Kari; Valpas, Antti; Talonpoika, Anna-Maria
2016-04-01
The healthcare system in Finland has begun routine collection of health-related quality of life (HRQoL) information for patients in hospitals to support more systematic cost-effectiveness analysis (CEA). This article describes the systematic collection of HRQoL survey data, and addresses challenges in the implementation of patient surveys and acquisition of cost data in the case hospital. Challenges include problems with incomplete data and undefined management processes. In order to support CEA of hospital treatments, improvements are sought from the process management literature and in the observation of healthcare professionals. The article has been written from an information system and process management perspective, concluding that process ownership, automation of data collection and better staff training are keys to generating more reliable data.
Managing patient complaints in China: a qualitative study in Shanghai
Jiang, Yishi; Ying, Xiaohua; Zhang, Qian; Tang, Sirui Rae; Kane, Sumit; Mukhopadhyay, Maitrayee; Qian, Xu
2014-01-01
Objectives To examine the handling system for patient complaints and to identify existing barriers that are associated with effective management of patient complaints in China. Setting Key stakeholders of the handling system for patient complaints at the national, Shanghai municipal and hospital levels in China. Participants 35 key informants including policymakers, hospital managers, healthcare providers, users and other stakeholders in Shanghai. Primary and secondary outcome measures Semistructured interviews were conducted to understand the process of handling patient complaints and factors affecting the process and outcomes of patient complaint management. Results The Chinese handling system for patient complaints was established in the past decade. Hospitals shoulder the most responsibility of patient complaint handling. Barriers to effective management of patient complaints included service users’ low awareness of the systems in the initial stage of the process; poor capacity and skills of healthcare providers, incompetence and powerlessness of complaint handlers and non-transparent exchange of information during the process of complaint handling; conflicts between relevant actors and regulations and unjustifiable complaints by patients during solution settlements; and weak enforcement of regulations, deficient information for managing patient complaints and unwillingness of the hospitals to effectively handle complaints in the postcomplaint stage. Conclusions Barriers to the effective management of patient complaints vary at the different stages of complaint handling and perspectives on these barriers differ between the service users and providers. Information, procedure design, human resources, system arrangement, unified legal system and regulations and factors shaping the social context all play important roles in effective patient complaint management. PMID:25146715
Putting the process of care into practice.
Houck, S; Baum, N
1997-01-01
"Putting the process of care into practice" provides an interactive, visual model of outpatient resources and processes. It illustrates an episode of care from a fee-for-service as well as managed care perspective. The Care Process Matrix can be used for planning and staffing, as well as retrospectively to assess appropriate resource use within a practice. It identifies effective strategies for reducing the cost per episode of care and optimizing quality while moving from managing costs to managing the care process. Because of an overbuilt health care system, including an oversupply of physicians, success in the future will require redesigning the process of care and a coherent customer service strategy. The growing complexities of practice will require physicians to focus on several key competencies while outsourcing other functions such as billing and contracting.
NASA Astrophysics Data System (ADS)
Buletti, Nora; Utz, Stephan; Ejderyan, Olivier; Graefe, Olivier; Lane, Stuart; Reynard, Emmanuel
2014-05-01
This research explores participatory processes in the domain of river management in Switzerland. The main objective is to better understand how participatory processes are incorporated into river management practice. Switzerland being a federal state, river management is a cantonal (regional) responsibility, under the supervision (and co-funding) of the State (a Confederation). The federal funding includes the opportunity to fund additional participatory activities to aid river management, not least because the federal authorities consider the involvement of wider stakeholders and the public in decision-making as a means of aiding the progression of projects. This is a particularly important goal in a Swiss setting where direct democracy (the possibility of calling the decision of any level of government into question through a popular vote) means that a reasonable level of project acceptance is a necessary element of project progression. River management in Switzerland now includes both flood protection and river restoration objectives, which has served to increase its controversy: river corridors contain competing interests with different objectives (e.g. ecological enhancement, protection of agricultural land, flood risk reduction). We were asked by the Confederation to evaluate participatory processes it sponsored and one element of this evaluation aimed to develop a typology of stakeholder participation. We conducted interviews with the 26 cantonal officers in charge of river management. These interviews were based upon thematically structured open ended questions, with the responses analyzed qualitatively. We have identified significant divergence in the implementation of participatory processes between the cantons. These appear to be related to two factors: (1) the canton's historical experience of river management; and (2) the methods used to select stakeholders for inclusion in the decisional process. Cantons that refer to guidelines or pre-established handbooks for the selection of stakeholders often conduct instrumental participation, limited to information dissemination. On the other hand, in some cantons participatory processes characterized by normative rationales take place. Here the goals of participatory processes are not limited to outcomes (e.g. acceptance of the project), but value the process of participation in itself. In these cantons actors are selected via social connections and the claimed 'common sense' of cantonal project officers. Here, the opportunity of public debate opens up, the inclusion of actors often start earlier in the decision-making processes and objectives are defined publicly and collectively. Cantonal authorities involved in river management do not all consider participatory processes as important. The acknowledgment of participatory processes is less related to an authority's recognition of the importance of participation and more to specific local experience.
technology areas that included: nanotechnology, nanomaterials, thin-film photovoltaics, thin-film processing , and program management. This includes extensive experience in nanotechnology, materials science
Varsi, Cecilie; Ekstedt, Mirjam; Gammon, Deede; Børøsund, Elin; Ruland, Cornelia M
2015-06-01
The role of nurse and physician managers is considered crucial for implementing eHealth interventions in clinical practice, but few studies have explored this. The aim of the current study was to examine the perceptions of nurse and physician managers regarding facilitators, barriers, management role, responsibility, and action taken in the implementation of an eHealth intervention called Choice into clinical practice. Individual qualitative interviews were conducted with six nurses and three physicians in management positions at five hospital units. The findings revealed that nurse managers reported conscientiously supporting the implementation, but workloads prevented them from participating in the process as closely as they wanted. Physician managers reported less contribution. The implementation process was influenced by facilitating factors such as perceptions of benefits from Choice and use of implementation strategies, along with barriers such as physician resistance, contextual factors and difficulties for front-line providers in learning a new way of communicating with the patients. The findings suggest that role descriptions for both nurse and physician managers should include implementation knowledge and implementation skills. Managers could benefit from an implementation toolkit. Implementation management should be included in management education for healthcare managers to prepare them for the constant need for implementation and improvement in clinical practice.
NASA Technical Reports Server (NTRS)
Lohr, Gary W.; Williams, Daniel M.
2008-01-01
Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.
32 CFR 855.2 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... authority. All decisions are subject to the environmental impact analysis process as directed by the... instructions. The decision process includes consultation with other affected functional area managers when...
12 CFR 741.12 - Liquidity and contingency funding plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
.../liability policy, a funds management policy, or a business continuity policy. The CFP must address, at a...; (3) Policies to manage a range of stress environments, identification of some possible stress events... the institution to respond to liquidity events; (5) Management processes that include clear...
15 CFR 923.52 - Consideration of the national interest in facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public..., and managing the coastal zone, including the siting of facilities such as energy facilities which are... to or affect a state's coastal zone. (4) Describe the process for continued consideration of the...
15 CFR 923.52 - Consideration of the national interest in facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coordination, Public..., and managing the coastal zone, including the siting of facilities such as energy facilities which are... to or affect a state's coastal zone. (4) Describe the process for continued consideration of the...
Automated Instructional Management Systems (AIMS) Version III, Users Manual.
ERIC Educational Resources Information Center
New York Inst. of Tech., Old Westbury.
This document sets forth the procedures necessary to utilize and understand the operating characteristics of the Automated Instructional Management System - Version III, a computer-based system for management of educational processes. Directions for initialization, including internal and user files; system and operational input requirements;…
Institutional Research: The Key to Successful Enrollment Management.
ERIC Educational Resources Information Center
Clagett, Craig A.
Enrollment management includes the processes and activities that influence the size, shape, and characteristics of a student body by directing institutional efforts in marketing, recruitment, admissions, pricing, and financial aid. Institutional research plays an essential, if not the key, role in enrollment management. This report discusses the…
Code of Federal Regulations, 2012 CFR
2012-04-01
... of complaints to the local office complaint specialist or local officer manager; (v) Referral to... office manager for processing in accordance with § 653.113. (l) Outreach workers shall be trained in... local office manager and maintained on file for at least two years. These records shall include the...
Code of Federal Regulations, 2013 CFR
2013-04-01
... of complaints to the local office complaint specialist or local officer manager; (v) Referral to... office manager for processing in accordance with § 653.113. (l) Outreach workers shall be trained in... local office manager and maintained on file for at least two years. These records shall include the...
Code of Federal Regulations, 2014 CFR
2014-04-01
... of complaints to the local office complaint specialist or local officer manager; (v) Referral to... office manager for processing in accordance with § 653.113. (l) Outreach workers shall be trained in... local office manager and maintained on file for at least two years. These records shall include the...
Code of Federal Regulations, 2011 CFR
2011-04-01
... of complaints to the local office complaint specialist or local officer manager; (v) Referral to... office manager for processing in accordance with § 653.113. (l) Outreach workers shall be trained in... local office manager and maintained on file for at least two years. These records shall include the...
Top 40 priorities for science to inform conservation and management policy in the United States
Fleishman, Erica; Blockstein, David E.; Hall, John A.; Mascia, Michael B.; Rudd, Murray A.; Scott, J. Michael; Sutherland, William J.; Bartuska, Ann M.; Brown, A. Gordon; Christen, Catherine A.; Clement, Joel P.; DellaSala, Dominick; Duke, Clifford D.; Fiske, Shirley J.; Gosnell, Hannah; Haney, J. Christopher; Hutchins, Michael; Klein, Mary L.; Marqusee, Jeffrey; Noon, Barry R.; Nordgren, John R.; Orbuch, Paul M.; Powell, Jimmie; Quarles, Steven P.; Saterson, Kathryn A.; Stein, Bruce A.; Webster, Michael S.; Vedder, Amy
2011-01-01
To maximize the utility of research to decisionmaking, especially given limited financial resources, scientists must set priorities for their efforts. We present a list of the top 40 high-priority, multidisciplinary research questions directed toward informing some of the most important current and future decisions about management of species, communities, and ecological processes in the United States. The questions were generated by an open, inclusive process that included personal interviews with decisionmakers, broad solicitation of research needs from scientists and policymakers, and an intensive workshop that included scientifically oriented individuals responsible for managing and developing policy related to natural resources. The process differed from previous efforts to set priorities for conservation research in its focus on the engagement of decisionmakers in addition to researchers. The research priorities emphasized the importance of addressing societal context and exploration of trade-offs among alternative policies and actions, as well as more traditional questions related to ecological processes and functions.
50 CFR 648.5 - Operator permits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...
What's Happening: Exemplary Programs in Business Education, Part III.
ERIC Educational Resources Information Center
Smiley, Anita; And Others
1984-01-01
The third in a series on exemplary programs in business education, this article includes brief descriptions of seven programs in word processing, information management, small business management, and office microcomputer specialist. (JOW)
50 CFR 648.5 - Operator permits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...
Methods and Management of the Healthy Brain Study: A Large Multisite Qualitative Research Project
ERIC Educational Resources Information Center
Laditka, Sarah B.; Corwin, Sara J.; Laditka, James N.; Liu, Rui; Friedman, Daniela B.; Mathews, Anna E.; Wilcox, Sara
2009-01-01
Purpose of the study: To describe processes used in the Healthy Brain project to manage data collection, coding, and data distribution in a large qualitative project, conducted by researchers at 9 universities in 9 states. Design and Methods: Project management protocols included: (a) managing audiotapes and surveys to ensure data confidentiality,…
Changsheng Li; Jianbo Cui
2004-01-01
A process- based model, Wetland-DNDC, was modified to enhance its capacity to predict the impacts of management practices on carbon sequestration in and trace gas emissions from forested wetland ecosystems. The modifications included parameterization of management practices fe.g., forest harvest, chopping, burning, water management, fertilization, and tree planting),...
Engaging stakeholders for adaptive management using structured decision analysis
Irwin, Elise R.; Kathryn, D.; Kennedy, Mickett
2009-01-01
Adaptive management is different from other types of management in that it includes all stakeholders (versus only policy makers) in the process, uses resource optimization techniques to evaluate competing objectives, and recognizes and attempts to reduce uncertainty inherent in natural resource systems. Management actions are negotiated by stakeholders, monitored results are compared to predictions of how the system should respond, and management strategies are adjusted in a “monitor-compare-adjust” iterative routine. Many adaptive management projects fail because of the lack of stakeholder identification, engagement, and continued involvement. Primary reasons for this vary but are usually related to either stakeholders not having ownership (or representation) in decision processes or disenfranchisement of stakeholders after adaptive management begins. We present an example in which stakeholders participated fully in adaptive management of a southeastern regulated river. Structured decision analysis was used to define management objectives and stakeholder values and to determine initial flow prescriptions. The process was transparent, and the visual nature of the modeling software allowed stakeholders to see how their interests and values were represented in the decision process. The development of a stakeholder governance structure and communication mechanism has been critical to the success of the project.
Implementation of a Project Management Office (PMO)--experiences from year 1.
Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann
2006-01-01
Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.
Chronic Disease Management in Family Practice: Clinical Note.
1998-03-01
disease management in the family practice selling. This paper discusses chronic disease management in the family practice selling....Chronic disease management is the process of evaluating and treating a medical condition or disease state which can not be readily cured so as to...minimize it’s negative impact on the individual. Examples of chronic disease management include the treatment of hypertension, diabetes, osteoporosis
Waste Management Information System (WMIS) User Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. E. Broz
2008-12-22
This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.
HACCP-Based Programs for Preventing Disease and Injury from Premise Plumbing: A Building Consensus
McCoy, William F.; Rosenblatt, Aaron A.
2015-01-01
Thousands of preventable injuries and deaths are annually caused by microbial, chemical and physical hazards from building water systems. Water is processed in buildings before use; this can degrade the quality of the water. Processing steps undertaken on-site in buildings often include conditioning, filtering, storing, heating, cooling, pressure regulation and distribution through fixtures that restrict flow and temperature. Therefore, prevention of disease and injury requires process management. A process management framework for buildings is the hazard analysis and critical control point (HACCP) adaptation of failure mode effects analysis (FMEA). It has been proven effective for building water system management. Validation is proof that hazards have been controlled under operating conditions and may include many kinds of evidence including cultures of building water samples to detect and enumerate potentially pathogenic microorganisms. However, results from culture tests are often inappropriately used because the accuracy and precision are not sufficient to support specifications for control limit or action triggers. A reliable negative screen is based on genus-level Polymerase Chain Reaction (PCR) for Legionella in building water systems; however, building water samples with positive results from this test require further analysis by culture methods. PMID:26184325
HACCP-Based Programs for Preventing Disease and Injury from Premise Plumbing: A Building Consensus.
McCoy, William F; Rosenblatt, Aaron A
2015-07-09
Thousands of preventable injuries and deaths are annually caused by microbial, chemical and physical hazards from building water systems. Water is processed in buildings before use; this can degrade the quality of the water. Processing steps undertaken on-site in buildings often include conditioning, filtering, storing, heating, cooling, pressure regulation and distribution through fixtures that restrict flow and temperature. Therefore, prevention of disease and injury requires process management. A process management framework for buildings is the hazard analysis and critical control point (HACCP) adaptation of failure mode effects analysis (FMEA). It has been proven effective for building water system management. Validation is proof that hazards have been controlled under operating conditions and may include many kinds of evidence including cultures of building water samples to detect and enumerate potentially pathogenic microorganisms. However, results from culture tests are often inappropriately used because the accuracy and precision are not sufficient to support specifications for control limit or action triggers. A reliable negative screen is based on genus-level Polymerase Chain Reaction (PCR) for Legionella in building water systems; however, building water samples with positive results from this test require further analysis by culture methods.
Consumer managed care appeals: are the available procedural protections fundamentally fair?
Nevers, A H
2000-01-01
Managed care incentives to reduce costs have also resulted in incentives to deny care. Anecdotes concerning managed care denials of care have led to a consumer outcry for protection either through the use of procedural due process or by the establishment of patient rights that would include appeal and grievance protections. This Article reviews the procedural protections of constitutional due process, the Consumer Due Process Protocol, and the Patient Bill of Rights. The Article then extensively discusses the availability of these procedural protections in various public and private forums. The discussion of public forums includes proposals contained in recent national legislative initiatives. The author then reviews relevant federal and state law, as well as Uniform Law proposals. Next, the Article analyzes the protections provided by accreditation agencies, dispute resolution organizations, professional organizations, and health insurers. Finally, the author recommends criteria to be used to determine whether a procedure is fundamentally fair.
Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure.
Mickelson, Robin S; Unertl, Kim M; Holden, Richard J
2016-10-12
Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. We identified 5 high-level macrocognitive processes affecting medication management-sensemaking, planning, coordination, monitoring, and decision making-and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation.
Development of risk-based air quality management strategies under impacts of climate change.
Liao, Kuo-Jen; Amar, Praveen; Tagaris, Efthimios; Russell, Armistead G
2012-05-01
Climate change is forecast to adversely affect air quality through perturbations in meteorological conditions, photochemical reactions, and precursor emissions. To protect the environment and human health from air pollution, there is an increasing recognition of the necessity of developing effective air quality management strategies under the impacts of climate change. This paper presents a framework for developing risk-based air quality management strategies that can help policy makers improve their decision-making processes in response to current and future climate change about 30-50 years from now. Development of air quality management strategies under the impacts of climate change is fundamentally a risk assessment and risk management process involving four steps: (1) assessment of the impacts of climate change and associated uncertainties; (2) determination of air quality targets; (3) selections of potential air quality management options; and (4) identification of preferred air quality management strategies that minimize control costs, maximize benefits, or limit the adverse effects of climate change on air quality when considering the scarcity of resources. The main challenge relates to the level of uncertainties associated with climate change forecasts and advancements in future control measures, since they will significantly affect the risk assessment results and development of effective air quality management plans. The concept presented in this paper can help decision makers make appropriate responses to climate change, since it provides an integrated approach for climate risk assessment and management when developing air quality management strategies. Development of climate-responsive air quality management strategies is fundamentally a risk assessment and risk management process. The risk assessment process includes quantification of climate change impacts on air quality and associated uncertainties. Risk management for air quality under the impacts of climate change includes determination of air quality targets, selections of potential management options, and identification of effective air quality management strategies through decision-making models. The risk-based decision-making framework can also be applied to develop climate-responsive management strategies for the other environmental dimensions and assess costs and benefits of future environmental management policies.
Data Management Facility Operations Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keck, Nicole N
2014-06-30
The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.
Quality Management and Control of Low Pressure Cast Aluminum Alloy
NASA Astrophysics Data System (ADS)
Zhang, Dianxi; Zhang, Yanbo; Yang, Xiufan; Chen, Zhaosong; Jiang, Zelan
2018-01-01
This paper briefly reviews the history of low pressure casting and summarizes the major production processes of low pressure casting. It briefly introduces the quality management and control of low pressure cast aluminum alloy. The main processes include are: preparation of raw materials, Melting, refining, physical and chemical analysis, K-mode inspection, sand core, mold, heat treatment and so on.
Using Agile Project Management to Enhance the Performance of Instructional Design Teams
ERIC Educational Resources Information Center
Sweeney, David S.; Cifuentes, Lauren
2010-01-01
Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…
Non-Procedural Languages for Information Resource Management.
ERIC Educational Resources Information Center
Bearley, William L.
The future of information resources management requires new approaches to implementing systems which will include a type of data base management that frees users to solve data processing problems logically by telling the system what they want, together with powerful non-procedural languages that will permit communication in simple, concise…
Project Management in Instructional Design: ADDIE Is Not Enough
ERIC Educational Resources Information Center
Van Rooij, Shahron Williams
2010-01-01
In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…
Managing for Results--Linking Performance Measures and Budgets.
ERIC Educational Resources Information Center
McGee, William L.; Fountain, James R., Jr.
1995-01-01
The Government Accounting Standards Board notion of service efforts and accomplishments reporting is one step in a process of managing for results that includes strategic planning, development and use of performance measures of managing ongoing programs, and outputs to budgetary appropriation. Reports a trial application to one school district.…
Research and management issues in large-scale fire modeling
David L. Peterson; Daniel L. Schmoldt
2000-01-01
In 1996, a team of North American fire scientists and resource managers convened to assess the effects of fire disturbance on ecosystems and to develop scientific recommendations for future fire research and management activities. These recommendations - elicited with the Analytic Hierarchy Process - include numerically ranked scientific and managerial questions and...
76 FR 78691 - Notice of Public Meeting; Wyoming Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... agenda topics include an overview of the BLM's planning process, the Casper Resource Management Plan, a... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWY910000 L16100000 XX0000] Notice of Public Meeting; Wyoming Resource Advisory Council AGENCY: Bureau of Land Management, Interior. ACTION...
The Need for Technology Management Education for Undergraduate Programs: A Conceptual Framework
ERIC Educational Resources Information Center
Tas, Murat; Yeloglu, H. Okan
2018-01-01
As the National Research Council [17] described the technology management as "a process, which includes planning, directing, control and coordination of the development and implementation of technological capabilities to shape and accomplish the strategic and operational objectives of an organization'', Technology Management education is…
The potential of disease management for neuromuscular hereditary disorders.
Chouinard, Maud-Christine; Gagnon, Cynthia; Laberge, Luc; Tremblay, Carmen; Côté, Charlotte; Leclerc, Nadine; Mathieu, Jean
2009-01-01
Neuromuscular hereditary disorders require long-term multidisciplinary rehabilitation management. Although the need for coordinated healthcare management has long been recognized, most neuromuscular disorders are still lacking clinical guidelines about their long-term management and structured evaluation plan with associated services. One of the most prevalent adult-onset neuromuscular disorders, myotonic dystrophy type 1, generally presents several comorbidities and a variable clinical picture, making management a constant challenge. This article presents a healthcare follow-up plan and proposes a nursing case management within a disease management program as an innovative and promising approach. This disease management program and model consists of eight components including population identification processes, evidence-based practice guidelines, collaborative practice, patient self-management education, and process outcomes evaluation (Disease Management Association of America, 2004). It is believed to have the potential to significantly improve healthcare management for neuromuscular hereditary disorders and will prove useful to nurses delivering and organizing services for this population.
Coordination and standardization of federal sedimentation activities
Glysson, G. Douglas; Gray, John R.
1997-01-01
- precipitation information critical to water resources management. Memorandum M-92-01 covers primarily freshwater bodies and includes activities, such as "development and distribution of consensus standards, field-data collection and laboratory analytical methods, data processing and interpretation, data-base management, quality control and quality assurance, and water- resources appraisals, assessments, and investigations." Research activities are not included.
Code of Federal Regulations, 2010 CFR
2010-04-01
... project management office in accordance with §§ 966.54 and 966.55(a). (c) Elements of due process shall... includes a resident management corporation. [40 FR 33406, Aug. 7, 1975. Redesignated at 49 FR 6714, Feb. 23...
Informational Webinar on Dredging and Dredged Material Management in Long Island Sound
EPA Region 1 and Region 2 informational webinar on dredging and dredged material management in Long Island Sound. Topics include: dredging permit process, dredged material testing, and dredged material disposal.
Code of Federal Regulations, 2014 CFR
2014-04-01
... project management office in accordance with §§ 966.54 and 966.55(a). (c) Elements of due process shall... includes a resident management corporation. [40 FR 33406, Aug. 7, 1975. Redesignated at 49 FR 6714, Feb. 23...
Code of Federal Regulations, 2012 CFR
2012-04-01
... project management office in accordance with §§ 966.54 and 966.55(a). (c) Elements of due process shall... includes a resident management corporation. [40 FR 33406, Aug. 7, 1975. Redesignated at 49 FR 6714, Feb. 23...
Code of Federal Regulations, 2013 CFR
2013-04-01
... project management office in accordance with §§ 966.54 and 966.55(a). (c) Elements of due process shall... includes a resident management corporation. [40 FR 33406, Aug. 7, 1975. Redesignated at 49 FR 6714, Feb. 23...
Code of Federal Regulations, 2011 CFR
2011-04-01
... project management office in accordance with §§ 966.54 and 966.55(a). (c) Elements of due process shall... includes a resident management corporation. [40 FR 33406, Aug. 7, 1975. Redesignated at 49 FR 6714, Feb. 23...
Prolong Your Roof's Performance: Roof Asset Management.
ERIC Educational Resources Information Center
Teitsma, Jerry
2001-01-01
Discusses the roof asset management process for maintaining a roof system's integrity and value in a cost-effective manner. Included is a breakdown of roofing surface characteristics for multiply and single ply roofing systems. (GR)
The neglected role of distress in pain management: qualitative research on a gastrointestinal ward.
Drake, Gareth; Williams, Amanda C de C
2018-05-09
Pain management for hospital inpatients remains suboptimal. Previously identified barriers to optimal pain management include staff communication difficulties, confusion around pain management roles and a lack of suitable resources for clinical staff. The emotional, relational and contextual complexities of gastrointestinal (GI) pain create particular challenges for frontline clinical staff attempting to implement a biopsychosocial approach to its management. The current study took place over 2 years, comprised an ethnographic and a feedback phase, and aimed to examine pain management processes with clinical staff in order to generate hypotheses and initiatives for improvement. This paper focuses on two overarching themes identified in the ethnographic phase of the study, centred on the neglected role of both staff and patient distress in GI pain management. Grounded theory and thematic analysis methods were used as part of action research, which involves collaborative working with clinical staff. The study took place on a 60 bed GI ward in a university hospital in London. Participants were clinical staff who were either ward-based or involved in the care of particular patients. This latter group included doctors, nurses, psychologists and physiotherapists from the Acute and Complex Pain Teams. Qualitative data on pain management processes was gathered from staff interviews, consultation groups, and observations of patient-staff interactions. Recruitment was purposive and collaborative in that early participants suggested targets and staff groups for subsequent enquiry. Following the identification of initial ethnographic themes, further analysis and the use of existing literature led to the identification of two overarching pain management processes. As such the results are divided into three sections: (i) illustration of initial ethnographic themes, (ii) summary of relevant theory used, (iii) exploration of hypothesised overarching processes. Initially, two consultation groups, five nursing staff and five junior doctors, provided key issues that were included in subsequent interviews (n=18) and observations (n=5). Initial ethnographic themes were divided into challenges and resources, reflecting the emergent structure of interviews and observations. Drawing on attachment, psychodynamic and evolutionary theories, themes were then regrouped around two overarching processes, centred on the neglected role of distress in pain management. The first process elucidates the lack of recognition during pain assessment of the emotional impact of patient distress on staff decision-making and pain management practice. The second process demonstrates that, as a consequence of resultant staff distress, communication between staff groups was fraught and resources, such as expert team referral and pharmacotherapy, appeared to function, at times, to protect staff rather than to help patients. Interpersonal skills used by staff to relieve patient distress were largely outside systems for pain care. Findings suggest that identified "barriers" to optimal pain management likely serve an important defensive function for staff and organisations. Unless the impact of patient distress on staff is recognised and addressed within the system, these barriers will persist.
Bouska, Kristin L.; Lindner, Garth; Paukert, Craig P.; Jacobson, Robert B.
2016-01-01
Floodplains pose challenges to managers of conservation lands because of constantly changing interactions with their rivers. Although scientific knowledge and understanding of the dynamics and drivers of river-floodplain systems can provide guidance to floodplain managers, the scientific process often occurs in isolation from management. Further, communication barriers between scientists and managers can be obstacles to appropriate application of scientific knowledge. With the coproduction of science in mind, our objectives were the following: (1) to document management priorities of floodplain conservation lands, and (2) identify science needs required to better manage the identified management priorities under nonstationary conditions, i.e., climate change, through stakeholder queries and interactions. We conducted an online survey with 80 resource managers of floodplain conservation lands along the Upper and Middle Mississippi River and Lower Missouri River, USA, to evaluate management priority, management intensity, and available scientific information for management objectives and conservation targets. Management objectives with the least information available relative to priority included controlling invasive species, maintaining respectful relationships with neighbors, and managing native, nongame species. Conservation targets with the least information available to manage relative to management priority included pollinators, marsh birds, reptiles, and shore birds. A follow-up workshop and survey focused on clarifying science needs to achieve management objectives under nonstationary conditions. Managers agreed that metrics of inundation, including depth and extent of inundation, and frequency, duration, and timing of inundation would be the most useful metrics for management of floodplain conservation lands with multiple objectives. This assessment provides guidance for developing relevant and accessible science products to inform management of highly dynamic floodplain environments. Although the problems facing managers of these lands are complex, products focused on a small suite of inundation metrics were determined to be the most useful to guide the decision making process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energy’s (DOE’s) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LM’s goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer ofmore » records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.« less
Workflow management systems in radiology
NASA Astrophysics Data System (ADS)
Wendler, Thomas; Meetz, Kirsten; Schmidt, Joachim
1998-07-01
In a situation of shrinking health care budgets, increasing cost pressure and growing demands to increase the efficiency and the quality of medical services, health care enterprises are forced to optimize or complete re-design their processes. Although information technology is agreed to potentially contribute to cost reduction and efficiency improvement, the real success factors are the re-definition and automation of processes: Business Process Re-engineering and Workflow Management. In this paper we discuss architectures for the use of workflow management systems in radiology. We propose to move forward from information systems in radiology (RIS, PACS) to Radiology Management Systems, in which workflow functionality (process definitions and process automation) is implemented through autonomous workflow management systems (WfMS). In a workflow oriented architecture, an autonomous workflow enactment service communicates with workflow client applications via standardized interfaces. In this paper, we discuss the need for and the benefits of such an approach. The separation of workflow management system and application systems is emphasized, and the consequences that arise for the architecture of workflow oriented information systems. This includes an appropriate workflow terminology, and the definition of standard interfaces for workflow aware application systems. Workflow studies in various institutions have shown that most of the processes in radiology are well structured and suited for a workflow management approach. Numerous commercially available Workflow Management Systems (WfMS) were investigated, and some of them, which are process- oriented and application independent, appear suitable for use in radiology.
Donnelly, Lane F
Deploying an intentional daily management process is a key part to create high-reliability culture. Key components described in the literature for a successfully daily management process include leadership standard work, visual controls, daily accountability processes, and the discipline to stick to the process over the long term. We believe that the institution of a daily readiness huddle has helped us better coordinate and communicate as a department and improved our ability to deliver imaging services on a daily basis. The daily readiness huddle has enabled us to more rapidly identify issues and has brought accountability to seeing solutions to those issues brought to fruition. In addition, it has helped with team building, including between the radiologists and the nonphysician staff. Copyright © 2017 Elsevier Inc. All rights reserved.
Participatory modeling and structured decision making
Robinson, Kelly F.; Fuller, Angela K.
2016-01-01
Structured decision making (SDM) provides a framework for making sound decisions even when faced with uncertainty, and is a transparent, defensible, and replicable method used to understand complex problems. A hallmark of SDM is the explicit incorporation of values and science, which often includes participation from multiple stakeholders, helping to garner trust and ultimately result in a decision that is more likely to be implemented. The core steps in the SDM process are used to structure thinking about natural resources management choices, and include: (1) properly defining the problem and the decision context, (2) determining the objectives that help describe the aspirations of the decision maker, (3) devising management actions or alternatives that can achieve those objectives, (4) evaluating the outcomes or consequences of each alternative on each of the objectives, (5) evaluating trade-offs, and (6) implementing the decision. Participatory modeling for SDM includes engaging stakeholders in some or all of the steps of the SDM process listed above. In addition, participatory modeling often is crucial for creating qualitative and quantitative models of how the system works, providing data for these models, and eliciting expert opinion when data are unavailable. In these ways, SDM provides a framework for decision making in natural resources management that includes participation from stakeholder groups throughout the process, including the modeling phase.
NASA Technical Reports Server (NTRS)
Kelle, Pido I.; Ratterman, Christian; Gibbs, Cecil
2009-01-01
This slide presentation reviews the Constellation Program Problem Reporting, Analysis and Corrective Action Process and System (Cx PRACA). The goal of the Cx PRACA is to incorporate Lessons learned from the Shuttle, ISS, and Orbiter programs by creating a single tool for managing the PRACA process, that clearly defines the scope of PRACA applicability and what must be reported, and defines the ownership and responsibility for managing the PRACA process including disposition approval authority. CxP PRACA is a process, supported by a single information gathering data module which will be integrated with a single CxP Information System, providing interoperability, import and export capability making the CxP PRACA a more effective and user friendly technical and management tool.
Initiatives and Challenges in Consequence Management after a WMD Attack
2004-08-01
Challenges in Consequence Management people to seek shelter or other protection when possible, to avoid exposure to weapons of mass destruction effects . The...Potential Effects .........................................9 V. Methods for Managing the Consequences of WMD Use.................14 VI. Toward a...mass destruction (WMD). Consequence management1 is a process to mitigate the effects of the use of weapons of mass destruction, including
Theory of Constraints for Services: Past, Present, and Future
NASA Astrophysics Data System (ADS)
Ricketts, John A.
Theory of constraints (TOC) is a thinking process and a set of management applications based on principles that run counter to conventional wisdom. TOC is best known in the manufacturing and distribution sectors where it originated. Awareness is growing in some service sectors, such as Health Care. And it's been adopted in some high-tech industries, such as Computer Software. Until recently, however, TOC was barely known in the Professional, Scientific, and Technical Services (PSTS) sector. Professional services include law, accounting, and consulting. Scientific services include research and development. And Technical services include development, operation, and support of various technologies. The main reason TOC took longer to reach PSTS is it's much harder to apply TOC principles when services are highly customized. Nevertheless, with the management applications described in this chapter, TOC has been successfully adapted for PSTS. Those applications cover management of resources, projects, processes, and finances.
Cochrane, Anita J; Dick, Bob; King, Neil A; Hills, Andrew P; Kavanagh, David J
2017-10-16
There have been consistent recommendations for multicomponent and multidisciplinary approaches for obesity management. However, there is no clear agreement on the components, disciplines or processes to be considered within such an approach. In this study, we explored multicomponent and multidisciplinary approaches through an examination of knowledge, skills, beliefs, and recommendations of stakeholders involved in obesity management. These stakeholders included researchers, practitioners, educators, and patients. We used qualitative action research methods, including convergent interviewing and observation, to assist the process of inquiry. The consensus was that a multicomponent and multidisciplinary approach should be based on four central meta-components (patient, practitioner, process, and environmental factors), and specific components of these factors were identified. Psychologists, dieticians, exercise physiologists and general practitioners were nominated as key practitioners to be included. A complex condition like obesity requires that multiple components be addressed, and that both patients and multiple disciplines are involved in developing solutions. Implementing cycles of continuous improvement to deal with complexity, instead of trying to control for it, offers an effective way to deal with complex, changing multisystem problems like obesity.
Dahm, Maria R; Georgiou, Andrew; Westbrook, Johanna I; Greenfield, David; Horvath, Andrea R; Wakefield, Denis; Li, Ling; Hillman, Ken; Bolton, Patrick; Brown, Anthony; Jones, Graham; Herkes, Robert; Lindeman, Robert; Legg, Michael; Makeham, Meredith; Moses, Daniel; Badmus, Dauda; Campbell, Craig; Hardie, Rae-Anne; Li, Julie; McCaughey, Euan; Sezgin, Gorkem; Thomas, Judith; Wabe, Nasir
2018-02-15
The failure to follow-up pathology and medical imaging test results poses patient-safety risks which threaten the effectiveness, quality and safety of patient care. The objective of this project is to: (1) improve the effectiveness and safety of test-result management through the establishment of clear governance processes of communication, responsibility and accountability; (2) harness health information technology (IT) to inform and monitor test-result management; (3) enhance the contribution of consumers to the establishment of safe and effective test-result management systems. This convergent mixed-methods project triangulates three multistage studies at seven adult hospitals and one paediatric hospital in Australia.Study 1 adopts qualitative research approaches including semistructured interviews, focus groups and ethnographic observations to gain a better understanding of test-result communication and management practices in hospitals, and to identify patient-safety risks which require quality-improvement interventions.Study 2 analyses linked sets of routinely collected healthcare data to examine critical test-result thresholds and test-result notification processes. A controlled before-and-after study across three emergency departments will measure the impact of interventions (including the use of IT) developed to improve the safety and quality of test-result communication and management processes.Study 3 adopts a consumer-driven approach, including semistructured interviews, and the convening of consumer-reference groups and community forums. The qualitative data will identify mechanisms to enhance the role of consumers in test-management governance processes, and inform the direction of the research and the interpretation of findings. Ethical approval has been granted by the South Eastern Sydney Local Health District Human Research Ethics Committee and Macquarie University. Findings will be disseminated in academic, industry and consumer journals, newsletters and conferences. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
Adaptive management of urban watersheds
NASA Astrophysics Data System (ADS)
Garmestani, A.; Shuster, W.; Green, O. O.
2013-12-01
Consent decree settlements for violations of the Clean Water Act (1972) increasingly include provisions for redress of combined sewer overflow activity through hybrid approaches that incorporate the best of both gray (e.g., storage tunnels) and green infrastructure (e.g., rain gardens). Adaptive management is an environmental management strategy that uses an iterative process of decision-making to improve environmental management via system monitoring. A central tenet of adaptive management is that management involves a learning process that can help regulated communities achieve environmental quality objectives. We are using an adaptive management approach to guide a green infrastructure retrofit of a neighborhood in the Slavic Village Development Corporation area (Cleveland, Ohio). We are in the process of gathering hydrologic and ecosystem services data and will use this data as a basis for collaboration with area citizens on a plan to use green infrastructure to contain stormflows. Monitoring data provides researchers with feedback on the impact of green infrastructure implementation and suggest where improvements can be made.
A review of risk management process in construction projects of developing countries
NASA Astrophysics Data System (ADS)
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
Proposal for a Security Management in Cloud Computing for Health Care
Dzombeta, Srdan; Brandis, Knud
2014-01-01
Cloud computing is actually one of the most popular themes of information systems research. Considering the nature of the processed information especially health care organizations need to assess and treat specific risks according to cloud computing in their information security management system. Therefore, in this paper we propose a framework that includes the most important security processes regarding cloud computing in the health care sector. Starting with a framework of general information security management processes derived from standards of the ISO 27000 family the most important information security processes for health care organizations using cloud computing will be identified considering the main risks regarding cloud computing and the type of information processed. The identified processes will help a health care organization using cloud computing to focus on the most important ISMS processes and establish and operate them at an appropriate level of maturity considering limited resources. PMID:24701137
Proposal for a security management in cloud computing for health care.
Haufe, Knut; Dzombeta, Srdan; Brandis, Knud
2014-01-01
Cloud computing is actually one of the most popular themes of information systems research. Considering the nature of the processed information especially health care organizations need to assess and treat specific risks according to cloud computing in their information security management system. Therefore, in this paper we propose a framework that includes the most important security processes regarding cloud computing in the health care sector. Starting with a framework of general information security management processes derived from standards of the ISO 27000 family the most important information security processes for health care organizations using cloud computing will be identified considering the main risks regarding cloud computing and the type of information processed. The identified processes will help a health care organization using cloud computing to focus on the most important ISMS processes and establish and operate them at an appropriate level of maturity considering limited resources.
Clinical laboratory waste management in Shiraz, Iran.
Askarian, Mehrdad; Motazedian, Nasrin; Palenik, Charles John
2012-06-01
Clinical laboratories are significant generators of infectious waste, including microbiological materials, contaminated sharps, and pathologic wastes such as blood specimens and blood products. Most waste produced in laboratories can be disposed of in the general solid waste stream. However, improper management of infectious waste, including mixing general wastes with infectious wastes and improper handling or storage, could lead to disease transmission. The aim of this study was to assess waste management processes used at clinical laboratories in Shiraz, Iran. One hundred and nine clinical laboratories participated In this cross sectional study, Data collection was by questionnaire and direct observation. Of the total amount of waste generated, 52% (by weight) was noninfectious domestic waste, 43% was non-sharps infectious waste and 5% consisted of sharps. There was no significant relationship between laboratory staff or manager education and the score for quality of waste collection and disposal at clinical laboratories. Improvements in infectious waste management processes should involve clearer, more uniformly accepted definitions of infectious waste and increased staff training.
Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure
2016-01-01
Background Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. Objective The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. Methods We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. Results We identified 5 high-level macrocognitive processes affecting medication management—sensemaking, planning, coordination, monitoring, and decision making—and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Conclusions Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation. PMID:27733331
Schumacher, Karen L; Plano Clark, Vicki L; West, Claudia M; Dodd, Marylin J; Rabow, Michael W; Miaskowski, Christine
2014-11-01
Despite the increasing complexity of medication regimens for persistent cancer pain, little is known about how oncology outpatients and their family caregivers manage pain medications at home. To describe the day-to-day management of pain medications from the perspectives of oncology outpatients and their family caregivers who participated in a randomized clinical trial of a psychoeducational intervention called the Pro-Self(©) Plus Pain Control Program. In this article, we focus on pain medication management in the context of highly individualized home environments and lifestyles. This qualitative study was conducted as part of a randomized clinical trial, in which an embedded mixed methods research design was used. Audio-recorded dialogue among patients, family caregivers, and intervention nurses was analyzed using qualitative research methods. Home and lifestyle contexts for managing pain medications included highly individualized home environments, work and recreational activities, personal routines, and family characteristics. Pain medication management processes particularly relevant in these contexts included understanding, organizing, storing, scheduling, remembering, and taking the medications. With the exception of their interactions with the intervention nurses, most study participants had little involvement with clinicians as they worked through these processes. Pain medication management is an ongoing multidimensional process, each step of which has to be mastered by patients and their family caregivers when cancer treatment and supportive care are provided on an outpatient basis. Realistic patient- and family-centered skill-building interventions are needed to achieve effective and safe pain medication management in the contexts of individual home environments and lifestyles. Copyright © 2014 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
VanNoord, Jonathan L.; Soulas, George C.; Sovey, James S.
2010-01-01
The results of the NEXT wear test are presented. This test was conducted with a 36-cm ion engine (designated PM1R) and an engineering model propellant management system. The thruster operated with beam extraction for a total of 1680 hr and processed 30.5 kg of xenon during the wear test, which included performance testing and some operation with an engineering model power processing unit. A total of 1312 hr was accumulated at full power, 277 hr at low power, and the remainder was at intermediate throttle levels. Overall ion engine performance, which includes thrust, thruster input power, specific impulse, and thrust efficiency, was steady with no indications of performance degradation. The propellant management system performed without incident during the wear test. The ion engine and propellant management system were also inspected following the test with no indication of anomalous hardware degradation from operation.
Maternal management behaviors for young children with type 1 diabetes.
Sullivan-Bolyai, Susan; Knafl, Kathleen; Deatrick, Janet; Grey, Margaret
2003-01-01
To describe the process that mothers raising young (0-4 years old) children who are newly diagnosed with type 1 diabetes move through to attain the necessary skills to care for their children. A mixed methods design was used, including qualitative interviews with 28 mothers of young children with type 1 diabetes. Principles of naturalistic inquiry were used to guide the data collection process, management, and analysis of the qualitative findings. The process paralleled two of three management approaches and associated behaviors previously described by Gallo and Knafl. Strict adherence behaviors included rigidly following the team recommendations and avoiding strange environments outside the home. Flexible adherence behaviors strove to bring spontaneity back into family life. Selective adherence was not used by this population. Nurses working with these mothers can provide information and support to help them transition from using strict adherence to the more user-friendly flexible adherence, while avoiding the pitfalls of the possibly harmful third approach of selective adherence. Nurses need to remember to praise the parents' efforts at managing their children's diabetes, for our acknowledgment of their work is empowering and affirming.
Institutionalizing Lessons Learned
NASA Technical Reports Server (NTRS)
McBrayer, Robert O.; Thomas, Dale
2001-01-01
The NASA Integrated Action Team (NIAT) was formed by the NASA Administrator in March 2000. The purpose of this team was to identify the actions that NASA must take to address systemic findings reported in 4 different anomaly investigations. Team membership represented senior managers from all the field centers and NASA Headquarters. NIAT report addressed 165 findings and developed 17 action plans that are described in five themes: people and teams, technology, risk, formulation rigor, and communications. The NIAT actions present a systems solution for strengthening formulation and implementation of programs and improving the environment for their support. NIAT results included: enhancing success by avoiding failures that could have been prevented through good planning and sound practice; ensuring that prudent risks do not compromise safety; and ensuring that mission risks are objectively assessed, appropriately mitigated and consciously accepted by the program team and customers. Definitions of Faster, Better, Cheaper and Success Criteria were also developed and included as part of the NIAT report. As a result of the NIAT report, program and project management process changes were incorporated into NASA's quality system documentation, including NPG 7120.513, "NASA Program and Project Management Processes and Requirements. This paper describes the NIAT results and the resulting updates to NPG 7120.5 that keep this program and project management description a living process.
ERIC Educational Resources Information Center
Chitrangsan, Nadrudee; Sawekngam, Wichai; Thongthew, Sumlee
2015-01-01
This research aims to study and develop a curriculum management process by applying Lean concept for waste elimination to enhance curriculum implementation of primary school teacher. This study was conducted with a focus on qualitative data collection by dividing into 2 phases, including (1) analyze and synthesize relevant notions, theories,…
Patrick Withen
2007-01-01
This paper offers an analysis of the strengths, weaknesses, opportunities, and threats in the risk management process, decision support systems (DSSs), and other types of decisionmaking, including recognition primed decisionmaking, bricolage with the goal of improving DSSs and decisionmaking. DSSs may be thought of as any technology or knowledge that is used as an aid...
Requirement analysis for the one-stop logistics management of fresh agricultural products
NASA Astrophysics Data System (ADS)
Li, Jun; Gao, Hongmei; Liu, Yuchuan
2017-08-01
Issues and concerns for food safety, agro-processing, and the environmental and ecological impact of food production have been attracted many research interests. Traceability and logistics management of fresh agricultural products is faced with the technological challenges including food product label and identification, activity/process characterization, information systems for the supply chain, i.e., from farm to table. Application of one-stop logistics service focuses on the whole supply chain process integration for fresh agricultural products is studied. A collaborative research project for the supply and logistics of fresh agricultural products in Tianjin was performed. Requirement analysis for the one-stop logistics management information system is studied. The model-driven business transformation, an approach uses formal models to explicitly define the structure and behavior of a business, is applied for the review and analysis process. Specific requirements for the logistic management solutions are proposed. Development of this research is crucial for the solution of one-stop logistics management information system integration platform for fresh agricultural products.
Reengineering health care: management systems for survivors.
Griffith, J R
1994-01-01
To survive in the coming era, health care organizations must support the powerful concepts of continuous quality improvement with better internal management systems that include: (1) new processes for making decisions from mission to clinical guidelines; (2) hoshin planning, which emphasizes strong financial management and innovation to meet customer needs; (3) new organizations that make cross-disciplinary teams as important as traditional clinical support services; and (4) expanded information covering several new dimensions, including enhanced analytic capability, and supporting both traditional organization and cross-disciplinary teams.
Guiding principles for management of forested, agricultural, and urban watersheds
Pamela J. Edwards; Jon E. Schoonover; Karl W.J. Williard
2015-01-01
Human actions must be well planned and include consideration of their potential influences on water and aquatic ecosystems - such consideration is the foundation of watershed management. Watersheds are the ideal land unit for managing and protecting water resources and aquatic health because watersheds integrate the physical, biological and chemical processes within...
The Impact of Organisational Change on the Nature and Extent of Training in Australian Enterprises
ERIC Educational Resources Information Center
Smith, Andrew; Oczkowski, Edward; Noble, Charles; Macklin, Robert
2004-01-01
This article reports on a study investigating the relationship between the introduction of new management practices and the training provided by Australian enterprises for their employees. The new management practices investigated include teamworking, total quality management, lean production, business process re-engineering and the learning…
Transforming for Distribution Based Logistics
2005-05-26
distribution process, and extracts elements of distribution and distribution management . Finally characteristics of an effective Army distribution...eventually evolve into a Distribution Management Element. Each organization is examined based on their ability to provide centralized command, with an...distribution and distribution management that together form the distribution system. Clearly all of the physical distribution activities including
Integration of Women into Management Positions: A Research Review.
ERIC Educational Resources Information Center
Terborg, James R.
This paper reviews the literature on the psychological and social processes involved in the integration of women into management positions. The author concentrates on two areas. First is the entry of women into management (including women's career choices, choice of organization, and the effects of these choices on the organization. These effects…
From Process to Product: Your Risk Process at Work
NASA Technical Reports Server (NTRS)
Kundrot, Craig E.; Fogarty, Jenifer; Charles, John; Buquo, Lynn; Sibonga, Jean; Alexander, David; Horn, Wayne G.; Edwards, J. Michelle
2010-01-01
The Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) at the NASA/Johnson Space Center work together to address and manage the human health and performance risks associated with human space flight. This includes all human system requirements before, during, and after space flight, providing for research, and managing the risk of adverse long-term health outcomes for the crew. We previously described the framework and processes developed for identifying and managing these human system risks. The focus of this panel is to demonstrate how the implementation of the framework and associated processes has provided guidance in the management and communication of human system risks. The risks of early onset osteoporosis, CO2 exposure, and intracranial hypertension in particular have all benefitted from the processes developed for human system risk management. Moreover, we are continuing to develop capabilities, particularly in the area of information architecture, which will also be described. We are working to create a system whereby all risks and associated actions can be tracked and related to one another electronically. Such a system will enhance the management and communication capabilities for the human system risks, thereby increasing the benefit to researchers and flight surgeons.
Ahlfeld, David P.; Barlow, Paul M.; Baker, Kristine M.
2011-01-01
Many groundwater-management problems are concerned with the control of one or more variables that reflect the state of a groundwater-flow system or a coupled groundwater/surface-water system. These system state variables include the distribution of heads within an aquifer, streamflow rates within a hydraulically connected stream, and flow rates into or out of aquifer storage. This report documents the new State Variables Package for the Groundwater-Management Process of MODFLOW-2005 (GWM-2005). The new package provides a means to explicitly represent heads, streamflows, and changes in aquifer storage as state variables in a GWM-2005 simulation. The availability of these state variables makes it possible to include system state in the objective function and enhances existing capabilities for constructing constraint sets for a groundwater-management formulation. The new package can be used to address groundwater-management problems such as the determination of withdrawal strategies that meet water-supply demands while simultaneously maximizing heads or streamflows, or minimizing changes in aquifer storage. Four sample problems are provided to demonstrate use of the new package for typical groundwater-management applications.
Cardiac catheterization laboratory management: the fundamentals.
Newell, Amy
2012-01-01
Increasingly, imaging administrators are gaining oversight for the cardiac cath lab as part of imaging services. Significant daily challenges include physician and staff demands, as well as patients who in many cases require higher acuity care. Along with strategic program driven responsibilities, the management role is complex. Critical elements that are the major impacts on cath lab management, as well as the overall success of a cardiac and vascular program, include program quality, patient safety, operational efficiency including inventory management, and customer service. It is critically important to have a well-qualified cath lab manager who acts as a leader by example, a mentor and motivator of the team, and an expert in the organization's processes and procedures. Such qualities will result in a streamlined cath lab with outstanding results.
NASA Technical Reports Server (NTRS)
1987-01-01
Potential applications of robots for cost effective commercial microelectronic processes in space were studied and the associated robotic requirements were defined. Potential space application areas include advanced materials processing, bulk crystal growth, and epitaxial thin film growth and related processes. All possible automation of these processes was considered, along with energy and environmental requirements. Aspects of robot capabilities considered include system intelligence, ROM requirements, kinematic and dynamic specifications, sensor design and configuration, flexibility and maintainability. Support elements discussed included facilities, logistics, ground support, launch and recovery, and management systems.
Computer Sciences and Data Systems, volume 1
NASA Technical Reports Server (NTRS)
1987-01-01
Topics addressed include: software engineering; university grants; institutes; concurrent processing; sparse distributed memory; distributed operating systems; intelligent data management processes; expert system for image analysis; fault tolerant software; and architecture research.
9 CFR 318.306 - Processing and production records.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and style; container code; container size and type; and the process schedule, including the minimum... product temperature. (Approved by the Office of Management and Budget under control number 0583-0015) ...
SAM 2 and SAGE data management and processing
NASA Technical Reports Server (NTRS)
Osborn, M. T.; Trepte, C. R.
1987-01-01
The data management and processing supplied by ST Systems Corporation (STX) for the Stratospheric Aerosol Measurement 2 (SAM 2) and Stratospheric Aerosol and Gas Experiment (SAGE) experiments for the years 1983 to 1986 are described. Included are discussions of data validation, documentation, and scientific analysis, as well as the archival schedule met by the operational reduction of SAM 2 and SAGE data. Work under this contract resulted in the archiving of the first seven years of SAM 2 data and all three years of SAGE data. A list of publications and presentations supported was also included.
Sapunar, Damir; Grković, Ivica; Lukšić, Davor; Marušić, Matko
2016-05-01
Our aim was to describe a comprehensive model of internal quality management (QM) at a medical school founded on the business process analysis (BPA) software tool. BPA software tool was used as the core element for description of all working processes in our medical school, and subsequently the system served as the comprehensive model of internal QM. The quality management system at the University of Split School of Medicine included the documentation and analysis of all business processes within the School. The analysis revealed 80 weak points related to one or several business processes. A precise analysis of medical school business processes allows identification of unfinished, unclear and inadequate points in these processes, and subsequently the respective improvements and increase of the QM level and ultimately a rationalization of the institution's work. Our approach offers a potential reference model for development of common QM framework allowing a continuous quality control, i.e. the adjustments and adaptation to contemporary educational needs of medical students. Copyright © 2016 by Academy of Sciences and Arts of Bosnia and Herzegovina.
Clinical process analysis and activity-based costing at a heart center.
Ridderstolpe, Lisa; Johansson, Andreas; Skau, Tommy; Rutberg, Hans; Ahlfeldt, Hans
2002-08-01
Cost studies, productivity, efficiency, and quality of care measures, the links between resources and patient outcomes, are fundamental issues for hospital management today. This paper describes the implementation of a model for process analysis and activity-based costing (ABC)/management at a Heart Center in Sweden as a tool for administrative cost information, strategic decision-making, quality improvement, and cost reduction. A commercial software package (QPR) containing two interrelated parts, "ProcessGuide and CostControl," was used. All processes at the Heart Center were mapped and graphically outlined. Processes and activities such as health care procedures, research, and education were identified together with their causal relationship to costs and products/services. The construction of the ABC model in CostControl was time-consuming. However, after the ABC/management system was created, it opened the way for new possibilities including process and activity analysis, simulation, and price calculations. Cost analysis showed large variations in the cost obtained for individual patients undergoing coronary artery bypass grafting (CABG) surgery. We conclude that a process-based costing system is applicable and has the potential to be useful in hospital management.
The technology management process at the European space agency
NASA Astrophysics Data System (ADS)
Guglielmi, M.; Williams, E.; Groepper, P.; Lascar, S.
2010-03-01
Technology is developed at the European Space Agency (ESA) under several programmes: corporate and domain specific, mandatory and optional, with different time horizons and covering different levels of the TRL scale. To improve the transparency and efficiency of the complete process, it was felt necessary to establish an agreed end to end process for the management of all technology R&D activity that could: Include all ESA programmes and consider the requirements of European users Lead to coordinated multi-year work plan and yearly procurement plans Prepare and enable future European space programmes Be harmonized with national initiatives in Europe Thereby establishing the basis for a product policy to reduce risks to technology users, reduce costs and delays, and enhance industrial competitiveness and non-dependence. In response to the above needs, ESA has developed a technology management process called the ESA End-to-End process (E2E), from establishment of the strategy to the monitoring and evaluation of R&D results. In this paper, the complete process will be described in detail including a discussion on its strengths and limitations, and its links to the wider European Harmonization process. The paper will be concluded with the introduction of the ESA Technology Tree: a basic tool to structure and facilitate communication about technology issues.
Waste Management Decision-Making Process During a Homeland Security Incident Response
A step-by-step guide on how to make waste management-related decisions including how waste can be minimized, collected and treated, as well as where waste can be sent for staging, storage and final disposal.
The Microcomputer and School Transportation.
ERIC Educational Resources Information Center
Dembowski, Frederick L.
1984-01-01
Microcomputers have many cost- and time-saving uses in school transportation management. Applications include routing and scheduling, demographic analysis, fleet maintenance, and personnel and contract management. Word processing is especially promising for storing and updating documents like specifications. Enrollment forecasting and inventory…
Code of Federal Regulations, 2010 CFR
2010-10-01
... ASSISTANCE PROGRAMS UTILIZATION CONTROL Drug Use Review (DUR) Program and Electronic Claims Management System... outpatient DUR program that includes prospective drug review, retrospective drug use review, and an... optional point-of-sale electronic claims management system for processing claims for covered outpatient...
Methods of Responsibly Managing End-of-Life Foams and Plastics Containing Flame Retardants: Part II.
Lucas, Donald; Petty, Sara M; Keen, Olya; Luedeka, Bob; Schlummer, Martin; Weber, Roland; Yazdani, Ramin; Riise, Brian; Rhodes, James; Nightingale, Dave; Diamond, Miriam L; Vijgen, John; Lindeman, Avery; Blum, Arlene; Koshland, Catherine P
2018-06-01
This is Part II of a review covering the wide range of issues associated with all aspects of the use and responsible disposal of foam and plastic wastes containing toxic or potentially toxic flame retardants. We identify basic and applied research needs in the areas of responsible collection, pretreatment, processing, and management of these wastes. In Part II, we explore alternative technologies for the management of halogenated flame retardant (HFR) containing wastes, including chemical, mechanical, and thermal processes for recycling, treatment, and disposal.
2011-09-01
DOD Financial Management Abbreviations AFB Air Force Base COSO Committee of Sponsoring Organizations of the Treadway... Management and mismanagement.11 All of DOD’s programs on GAO’s High- Risk List relate to its business operations, including systems and processes... Management maintains audit readiness through risk -based periodic testing of internal controls utilizing the OMB Circular No. A-123, Appendix A
Teaching Case: MiHotel--Applicant Processing System Design Case
ERIC Educational Resources Information Center
Miller, Robert E.; Dunn, Paul
2018-01-01
This teaching case describes the functionality of an applicant processing system designed for a fictitious hotel chain. The system detailed in the case includes a webform where applicants complete and submit job applications. The system also includes a desktop application used by hotel managers and Human Resources to track applications and process…
2002-08-16
advances in information technology. Customer Relationship Management ( CRM ) is a concept that has personalized the marketing process over the Internet. An...even newer concept, Employee Relationship Management (ERM), seeks to turn the lessons learned from CRM inwards to a company’s own employees, not to...within the Navy, resulting in Sailor Relationship Management (SRM.) The work included focus group interviews that led to the development of a survey
Sustainable data and metadata management at the BD2K-LINCS Data Coordination and Integration Center
Stathias, Vasileios; Koleti, Amar; Vidović, Dušica; Cooper, Daniel J.; Jagodnik, Kathleen M.; Terryn, Raymond; Forlin, Michele; Chung, Caty; Torre, Denis; Ayad, Nagi; Medvedovic, Mario; Ma'ayan, Avi; Pillai, Ajay; Schürer, Stephan C.
2018-01-01
The NIH-funded LINCS Consortium is creating an extensive reference library of cell-based perturbation response signatures and sophisticated informatics tools incorporating a large number of perturbagens, model systems, and assays. To date, more than 350 datasets have been generated including transcriptomics, proteomics, epigenomics, cell phenotype and competitive binding profiling assays. The large volume and variety of data necessitate rigorous data standards and effective data management including modular data processing pipelines and end-user interfaces to facilitate accurate and reliable data exchange, curation, validation, standardization, aggregation, integration, and end user access. Deep metadata annotations and the use of qualified data standards enable integration with many external resources. Here we describe the end-to-end data processing and management at the DCIC to generate a high-quality and persistent product. Our data management and stewardship solutions enable a functioning Consortium and make LINCS a valuable scientific resource that aligns with big data initiatives such as the BD2K NIH Program and concords with emerging data science best practices including the findable, accessible, interoperable, and reusable (FAIR) principles. PMID:29917015
NASA Astrophysics Data System (ADS)
Halbe, Johannes; Pahl-Wostl, Claudia; Adamowski, Jan
2018-01-01
Multiple barriers constrain the widespread application of participatory methods in water management, including the more technical focus of most water agencies, additional cost and time requirements for stakeholder involvement, as well as institutional structures that impede collaborative management. This paper presents a stepwise methodological framework that addresses the challenges of context-sensitive initiation, design and institutionalization of participatory modeling processes. The methodological framework consists of five successive stages: (1) problem framing and stakeholder analysis, (2) process design, (3) individual modeling, (4) group model building, and (5) institutionalized participatory modeling. The Management and Transition Framework is used for problem diagnosis (Stage One), context-sensitive process design (Stage Two) and analysis of requirements for the institutionalization of participatory water management (Stage Five). Conceptual modeling is used to initiate participatory modeling processes (Stage Three) and ensure a high compatibility with quantitative modeling approaches (Stage Four). This paper describes the proposed participatory model building (PMB) framework and provides a case study of its application in Québec, Canada. The results of the Québec study demonstrate the applicability of the PMB framework for initiating and designing participatory model building processes and analyzing barriers towards institutionalization.
Grounding explanations in evolving, diagnostic situations
NASA Technical Reports Server (NTRS)
Johannesen, Leila J.; Cook, Richard I.; Woods, David D.
1994-01-01
Certain fields of practice involve the management and control of complex dynamic systems. These include flight deck operations in commercial aviation, control of space systems, anesthetic management during surgery or chemical or nuclear process control. Fault diagnosis of these dynamic systems generally must occur with the monitored process on-line and in conjunction with maintaining system integrity.This research seeks to understand in more detail what it means for an intelligent system to function cooperatively, or as a 'team player' in complex, dynamic environments. The approach taken was to study human practitioners engaged in the management of a complex, dynamic process: anesthesiologists during neurosurgical operations. The investigation focused on understanding how team members cooperate in management and fault diagnosis and comparing this interaction to the situation with an Artificial Intelligence(AI) system that provides diagnoses and explanations. Of particular concern was to study the ways in which practitioners support one another in keeping aware of relevant information concerning the state of the monitored process and of the problem solving process.
Modeling of ETL-Processes and Processed Information in Clinical Data Warehousing.
Tute, Erik; Steiner, Jochen
2018-01-01
Literature describes a big potential for reuse of clinical patient data. A clinical data warehouse (CDWH) is a means for that. To support management and maintenance of processes extracting, transforming and loading (ETL) data into CDWHs as well as to ease reuse of metadata between regular IT-management, CDWH and secondary data users by providing a modeling approach. Expert survey and literature review to find requirements and existing modeling techniques. An ETL-modeling-technique was developed extending existing modeling techniques. Evaluation by exemplarily modeling existing ETL-process and a second expert survey. Nine experts participated in the first survey. Literature review yielded 15 included publications. Six existing modeling techniques were identified. A modeling technique extending 3LGM2 and combining it with openEHR information models was developed and evaluated. Seven experts participated in the evaluation. The developed approach can help in management and maintenance of ETL-processes and could serve as interface between regular IT-management, CDWH and secondary data users.
Financial management and dental school equity, Part II: Tactics.
Chambers, David W; Bergstrom, Roy
2004-04-01
Financial management includes all processes that build organizations' equity through accumulating assets in strategically important areas. The tactical aspects of financial management are budget deployment and monitoring. Budget deployment is the process of making sure that costs are fairly allocated. Budget monitoring addresses issues of effective uses and outcomes of resources. This article describes contemporary deployment and monitoring mechanisms, including revenue positive and marginal analysis, present value, program phases, options logic, activity-based costing, economic value added, cost of quality, variance reconciliation, and balanced scorecards. The way financial decisions are framed affects comparative decision-making and even influences the arithmetic of accounting. Familiarity with these concepts should make it possible for dental educators to more fully participate in discussions about the relationships between budgeting and program strategy.
Commentary on the reimbursement paradox.
Reaven, Nancy L; Rosenbloom, Judy
2009-07-01
Reimbursement policies are a critical step in the incorporation of new technologies and therapies into the clinical armamentarium. Reimbursement is an umbrella concept describing the process to manage and pay for healthcare services, including benefit coverage, coding, and payment processes. The technologies and services used in therapeutic temperature management are not directly reimbursed, leading to challenges by hospitals and physicians that the services are too expensive to use. The reimbursement models used in the United States make it increasingly difficult for new technologies and therapies to gain direct reimbursement, part of a strategy by insurers, including Medicare and private insurance companies, to manage access to health care services. Insurers, physicians, hospitals, and other providers face conflicting financial incentives in current reimbursement systems. Aligning the financial incentives underlying reimbursement systems is necessary to adequately support new technologies of merit.
Zurba, Melanie; Ross, Helen; Izurieta, Arturo; Rist, Philip; Bock, Ellie; Berkes, Fikret
2012-06-01
Collaborative problem solving has increasingly become important in the face of the complexities in the management of resources, including protected areas. The strategy undertaken by Girringun Aboriginal Corporation in north tropical Queensland, Australia, for developing co-management demonstrates the potential for a problem solving approach involving sequential initiatives, as an alternative to the more familiar negotiated agreements for co-management. Our longitudinal case study focuses on the development of indigenous ranger units as a strategic mechanism for the involvement of traditional owners in managing their country in collaboration with government and other interested parties. This was followed by Australia's first traditional use of marine resources agreement, and development of a multi-jurisdictional, land to sea, indigenous protected area. In using a relationship building approach to develop regional scale co-management, Girringun has been strengthening its capabilities as collaborator and regional service provider, thus, bringing customary decision-making structures into play to 'care for country'. From this evolving process we have identified the key components of a relationship building strategy, 'the pillars of co-management'. This approach includes learning-by-doing, the building of respect and rapport, sorting out responsibilities, practical engagement, and capacity-building.
NASA Astrophysics Data System (ADS)
Zurba, Melanie; Ross, Helen; Izurieta, Arturo; Rist, Philip; Bock, Ellie; Berkes, Fikret
2012-06-01
Collaborative problem solving has increasingly become important in the face of the complexities in the management of resources, including protected areas. The strategy undertaken by Girringun Aboriginal Corporation in north tropical Queensland, Australia, for developing co-management demonstrates the potential for a problem solving approach involving sequential initiatives, as an alternative to the more familiar negotiated agreements for co-management. Our longitudinal case study focuses on the development of indigenous ranger units as a strategic mechanism for the involvement of traditional owners in managing their country in collaboration with government and other interested parties. This was followed by Australia's first traditional use of marine resources agreement, and development of a multi-jurisdictional, land to sea, indigenous protected area. In using a relationship building approach to develop regional scale co-management, Girringun has been strengthening its capabilities as collaborator and regional service provider, thus, bringing customary decision-making structures into play to `care for country'. From this evolving process we have identified the key components of a relationship building strategy, `the pillars of co-management'. This approach includes learning-by-doing, the building of respect and rapport, sorting out responsibilities, practical engagement, and capacity-building.
A Statewide Survey Report of Roles and Responsibilities in Current Utah Care Management Processes.
Luther, Brenda; Martial, Marc-Aurel; Barra, Joyce
Measure current roles and responsibilities of care managers in the state of Utah. All settings of health care including inpatient, outpatient, community, payer, post-acute, and transitional care settings. A quantitative descriptive survey design was used to assess and describe current care management roles and responsibilities of 191 care managers within the state of Utah. Quantitative variables of roles and responsibilities were collected an electronic database (REDCap). Major results conclude that care managers spend most of their time on direct patient interactions including discharge planning, population care, and utilization review. These care managers are highly experienced in their field, with most being in their professional practice for more than 10 years. Most of the care managers are bachelor's prepared nurses. To create or expand care management processes to meet the goals of health care reform, systems first need to know what care managers/coordinators are doing and where their current focus on care presides. Educators, leaders, and, indeed, the care managers themselves are a part of preparing this dynamic workforce. The major responsibility of care management continues to be direct patient interactions, meaning that care managers are performing vital interpersonal patient interaction needed to achieve highly personalized patient care with assurances of quality and safety. No matter the name-care management, case management, or care coordination-these activities are an essential part of health care, with highly specialized skills that promote patient engagement and activation.
Hemens, Brian J; Holbrook, Anne; Tonkin, Marita; Mackay, Jean A; Weise-Kelly, Lorraine; Navarro, Tamara; Wilczynski, Nancy L; Haynes, R Brian
2011-08-03
Computerized clinical decision support systems (CCDSSs) for drug therapy management are designed to promote safe and effective medication use. Evidence documenting the effectiveness of CCDSSs for improving drug therapy is necessary for informed adoption decisions. The objective of this review was to systematically review randomized controlled trials assessing the effects of CCDSSs for drug therapy management on process of care and patient outcomes. We also sought to identify system and study characteristics that predicted benefit. We conducted a decision-maker-researcher partnership systematic review. We updated our earlier reviews (1998, 2005) by searching MEDLINE, EMBASE, EBM Reviews, Inspec, and other databases, and consulting reference lists through January 2010. Authors of 82% of included studies confirmed or supplemented extracted data. We included only randomized controlled trials that evaluated the effect on process of care or patient outcomes of a CCDSS for drug therapy management compared to care provided without a CCDSS. A study was considered to have a positive effect (i.e., CCDSS showed improvement) if at least 50% of the relevant study outcomes were statistically significantly positive. Sixty-five studies met our inclusion criteria, including 41 new studies since our previous review. Methodological quality was generally high and unchanged with time. CCDSSs improved process of care performance in 37 of the 59 studies assessing this type of outcome (64%, 57% of all studies). Twenty-nine trials assessed patient outcomes, of which six trials (21%, 9% of all trials) reported improvements. CCDSSs inconsistently improved process of care measures and seldomly improved patient outcomes. Lack of clear patient benefit and lack of data on harms and costs preclude a recommendation to adopt CCDSSs for drug therapy management.
Hooshmand, Elaheh; Tourani, Sogand; Ravaghi, Hamid; Vafaee Najar, Ali; Meraji, Marziye; Ebrahimipour, Hossein
2015-04-08
The purpose of implementing a system such as Clinical Governance (CG) is to integrate, establish and globalize distinct policies in order to improve quality through increasing professional knowledge and the accountability of healthcare professional toward providing clinical excellence. Since CG is related to change, and change requires money and time, CG implementation has to be focused on priority areas that are in more dire need of change. The purpose of the present study was to validate and determine the significance of items used for evaluating CG implementation. The present study was descriptive-quantitative in method and design. Items used for evaluating CG implementation were first validated by the Delphi method and then compared with one another and ranked based on the Analytical Hierarchy Process (AHP) model. The items that were validated for evaluating CG implementation in Iran include performance evaluation, training and development, personnel motivation, clinical audit, clinical effectiveness, risk management, resource allocation, policies and strategies, external audit, information system management, research and development, CG structure, implementation prerequisites, the management of patients' non-medical needs, complaints and patients' participation in the treatment process. The most important items based on their degree of significance were training and development, performance evaluation, and risk management. The least important items included the management of patients' non-medical needs, patients' participation in the treatment process and research and development. The fundamental requirements of CG implementation included having an effective policy at national level, avoiding perfectionism, using the expertise and potentials of the entire country and the coordination of this model with other models of quality improvement such as accreditation and patient safety. © 2015 by Kerman University of Medical Sciences.
Hashim, Muhammad Jawad; Prinsloo, Adrianna; Mirza, Deen M
2013-01-01
Chronic disease services may be improved if care management processes (CMPs), such as disease-specific flowsheets and chronic disease registries, are used. The newly industrialized Gulf state health service has underdeveloped primary care but higher diabetes prevalence. This paper's aim is to investigate care management processes in United Arab Emirates (UAE) primary care clinics to explore these issues. A cross-sectional survey using self-administered questionnaires given to family physicians and nurses attending a UAE University workshop was used to collect data. All 38 participants completed the questionnaire: 68 per cent were women and 81 per cent physicians. Care management processes in use included: medical records, 76 per cent; clinical guidelines, 74 per cent; chronic disease care rooms, 74 per cent; disease-specific flowsheets, 61 per cent; medical record audits, 57 per cent; chronic disease nurse-educators, 58 per cent; electronic medical records (EMR), 34 per cent; and incentive plans based on clinical performance, 21 per cent. Only 62 per cent and 48 per cent reported that flowsheets and problem lists, respectively, were completed by physicians. Responses to the open-ended question included using traditional quality improvement (QI) approaches such as continuing education and staff meetings, but not proactive systems such as disease registries and self-management. The study used a small, non-random sample and the survey instrument's psychometric properties were not collected. Chronic disease care CMPs are present in UAE clinics but use is limited. Quality improvement should include disease registries, reminder-tracking systems, patient self-management support and quality incentives. This report highlights the lag regarding adopting more effective CMPs in developing countries.
28 CFR 512.14 - Submission and processing of proposal.
Code of Federal Regulations, 2011 CFR
2011-07-01
... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.14 Submission and processing of proposal. (a) An... subjects' behavior and the research will not involve stress to subjects. Such research would include test...
28 CFR 512.14 - Submission and processing of proposal.
Code of Federal Regulations, 2013 CFR
2013-07-01
... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.14 Submission and processing of proposal. (a) An... subjects' behavior and the research will not involve stress to subjects. Such research would include test...
28 CFR 512.14 - Submission and processing of proposal.
Code of Federal Regulations, 2012 CFR
2012-07-01
... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.14 Submission and processing of proposal. (a) An... subjects' behavior and the research will not involve stress to subjects. Such research would include test...
28 CFR 512.14 - Submission and processing of proposal.
Code of Federal Regulations, 2014 CFR
2014-07-01
... MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.14 Submission and processing of proposal. (a) An... subjects' behavior and the research will not involve stress to subjects. Such research would include test...
Wang, Henry E.; Prince, David; Stephens, Shannon W.; Herren, Heather; Daya, Mohamud; Richmond, Neal; Carlson, Jestin; Warden, Craig; Colella, M. Riccardo; Brienza, Ashley; Aufderheide, Tom P.; Idris, Ahamed; Schmicker, Robert; May, Susanne; Nichol, Graham
2016-01-01
Airway management is an important component of resuscitation from out-of-hospital cardiac arrest (OHCA). The optimal approach to advanced airway management is unknown. The Pragmatic Airway Resuscitation Trial (PART) will compare the effectiveness of endotracheal intubation (ETI) and Laryngeal Tube (LT) insertion upon 72-hour survival in adult OHCA. Encompassing United States Emergency Medical Services agencies affiliated with the Resuscitation Outcomes Consortium (ROC), PART will use a cluster-crossover randomized design. Participating subjects will include adult, non-traumatic OHCA requiring bag-valve-mask ventilation. Trial interventions will include 1) initial airway management with ETI and 2) initial airway management with LT. The primary and secondary trial outcomes are 72-hour survival and return of spontaneous circulation. Additional clinical outcomes will include airway management process and adverse events. The trial will enroll a total of 3,000 subjects. Results of PART may guide the selection of advanced airway management strategies in OHCA. PMID:26851059
MacNeil Vroomen, Janet; Van Mierlo, Lisa D; van de Ven, Peter M; Bosmans, Judith E; van den Dungen, Pim; Meiland, Franka J M; Dröes, Rose-Marie; Moll van Charante, Eric P; van der Horst, Henriëtte E; de Rooij, Sophia E; van Hout, Hein P J
2012-05-28
Dementia care in the Netherlands is shifting from fragmented, ad hoc care to more coordinated and personalised care. Case management contributes to this shift. The linkage model and a combination of intensive case management and joint agency care models were selected based on their emerging prominence in the Netherlands. It is unclear if these different forms of case management are more effective than usual care in improving or preserving the functioning and well-being at the patient and caregiver level and at the societal cost. The objective of this article is to describe the design of a study comparing these two case management care models against usual care. Clinical and cost outcomes are investigated while care processes and the facilitators and barriers for implementation of these models are considered. Mixed methods include a prospective, observational, controlled, cohort study among persons with dementia and their primary informal caregiver in regions of the Netherlands with and without case management including a qualitative process evaluation. Inclusion criteria for the cohort study are: community-dwelling individuals with a dementia diagnosis who are not terminally-ill or anticipate admission to a nursing home within 6 months and with an informal caregiver who speaks fluent Dutch. Person with dementia-informal caregiver dyads are followed for two years. The primary outcome measure is the Neuropsychiatric Inventory for the people with dementia and the General Health Questionnaire for their caregivers. Secondary outcomes include: quality of life and needs assessment in both persons with dementia and caregivers, activity of daily living, competence of care, and number of crises. Costs are measured from a societal perspective using cost diaries. Process indicators measure the quality of care from the participant's perspective. The qualitative study uses purposive sampling methods to ensure a wide variation of respondents. Semi-structured interviews with stakeholders based on the theoretical model of adaptive implementation are planned. This study provides relevant insights into care processes, description of two case management models along with clinical and economic data from persons with dementia and caregivers to clarify important differences in two case management care models compared to usual care.
2012-01-01
Background Dementia care in the Netherlands is shifting from fragmented, ad hoc care to more coordinated and personalised care. Case management contributes to this shift. The linkage model and a combination of intensive case management and joint agency care models were selected based on their emerging prominence in the Netherlands. It is unclear if these different forms of case management are more effective than usual care in improving or preserving the functioning and well-being at the patient and caregiver level and at the societal cost. The objective of this article is to describe the design of a study comparing these two case management care models against usual care. Clinical and cost outcomes are investigated while care processes and the facilitators and barriers for implementation of these models are considered. Design Mixed methods include a prospective, observational, controlled, cohort study among persons with dementia and their primary informal caregiver in regions of the Netherlands with and without case management including a qualitative process evaluation. Inclusion criteria for the cohort study are: community-dwelling individuals with a dementia diagnosis who are not terminally-ill or anticipate admission to a nursing home within 6 months and with an informal caregiver who speaks fluent Dutch. Person with dementia-informal caregiver dyads are followed for two years. The primary outcome measure is the Neuropsychiatric Inventory for the people with dementia and the General Health Questionnaire for their caregivers. Secondary outcomes include: quality of life and needs assessment in both persons with dementia and caregivers, activity of daily living, competence of care, and number of crises. Costs are measured from a societal perspective using cost diaries. Process indicators measure the quality of care from the participant’s perspective. The qualitative study uses purposive sampling methods to ensure a wide variation of respondents. Semi-structured interviews with stakeholders based on the theoretical model of adaptive implementation are planned. Discussion This study provides relevant insights into care processes, description of two case management models along with clinical and economic data from persons with dementia and caregivers to clarify important differences in two case management care models compared to usual care. PMID:22640695
Integrated Computer System of Management in Logistics
NASA Astrophysics Data System (ADS)
Chwesiuk, Krzysztof
2011-06-01
This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.
ERIC Educational Resources Information Center
England, Lenore; Fu, Li
2011-01-01
A critical part of electronic resources management, the electronic resources evaluation process is multi-faceted and includes a seemingly endless range of resources and tools involving numerous library staff. A solution is to build a Web site to bring all of the components together that can be implemented quickly and result in an organizational…
Bibliography. College and University Business Administration.
ERIC Educational Resources Information Center
National Association of College and University Business Officers, Washington, DC.
This regularly-updated bibliography is organized by chapter and is generally limited to publications that have specific application to colleges and universities. The chapters include: business administration in higher education; institutional planning; management information systems and data processing; risk management and insurance;…
Myths, Misconceptions, and Realities about Public Procurement Automation.
ERIC Educational Resources Information Center
Bonner, Larry
1989-01-01
Meaningful public procurement and inventory management automation encompasses all purchasing and materials management processes, including bidder selection; bidder responsiveness tracking; preparation of bid solicitations; bid tabulation; the tracking of requisitions, bid solicitations, and deliveries; and item purchasing history reports. (MLH)
Strategies for Hard Times in Higher Education.
ERIC Educational Resources Information Center
Desfosses, Louis R.
1996-01-01
Planning and management strategies used in the private sector have practical applications for higher education in a period of systemic and organizational stress. Promising strategies include organizational delayering; employee empowerment; boundless thinking, problem-solving teams; accelerated processes; quality management and improvement; and…
Code of Federal Regulations, 2011 CFR
2011-07-01
... System Land and Resource Management Planning The Framework for Planning § 219.3 Overview. (a) The planning framework. Land and resource management planning is a flexible process for fitting solutions to... responsible for national planning. National planning includes the Forest Service national strategic plan...
NASA Astrophysics Data System (ADS)
Kubo, Hideyuki
2008-07-01
In the context of state forestland management in tropical regions, the implementation of a co-management approach has been widely advocated in order to include the voices of local people and accommodate their interests in management decision-making. Most co-management literatures, however, underestimate the significance of statutory authority held by state to control forestlands and resources. By clarifying the implications of state ownership of forestland, this article aims to critically examine co-management processes with reference to Foucault’s notion of power and subject. Case studies were conducted at two co-management pilot sites in Gunung Halimun-Salak National Park, West Java, Indonesia. Findings demonstrate that co-management processes actually materialize shared decision-making arrangements between state forest bureaucracy and rural people through the application of equity approaches, such as deliberation, negotiation, and experimentation. At the same time, these processes can also function to diffuse state policy discourse in rural spheres, which makes rural subjects who accept and practice the policy discourse. The research also reveals that the diffusion process is complex and does not necessarily make a durable subject unless they are pertinently organized. The results of this research indicate that co-management of state forestlands is a double-edged process for local people who risk becoming a proxy of state bureaucracy in the implementation of state policy. Proponents of co-management should, therefore, critically examine whether new institutional arrangements, which are developed through co-management, truly reflect values and needs of local people and assist them to develop a pertinent subject to deal with it.
Testing Components of a Self-Management Theory in Adolescents With Type 1 Diabetes Mellitus.
Verchota, Gwen; Sawin, Kathleen J
The role of self-management in adolescents with type 1 diabetes mellitus is not well understood. The purpose of the research was to examine the relationship of key individual and family self-management theory, context, and process variables on proximal (self-management behaviors) and distal (hemoglobin A1c and diabetes-specific health-related quality of life) outcomes in adolescents with type 1 diabetes. A correlational, cross-sectional study was conducted to identify factors contributing to outcomes in adolescents with Type 1 diabetes and examine potential relationships between context, process, and outcome variables delineated in individual and family self-management theory. Participants were 103 adolescent-parent dyads (adolescents ages 12-17) with Type 1 diabetes from a Midwest, outpatient, diabetes clinic. The dyads completed a self-report survey including instruments intended to measure context, process, and outcome variables from individual and family self-management theory. Using hierarchical multiple regression, context (depressive symptoms) and process (communication) variables explained 37% of the variance in self-management behaviors. Regimen complexity-the only significant predictor-explained 11% of the variance in hemoglobin A1c. Neither process variables nor self-management behaviors were significant. For the diabetes-specific health-related quality of life outcome, context (regimen complexity and depressive symptoms) explained 26% of the variance at step 1; an additional 9% of the variance was explained when process (self-efficacy and communication) variables were added at step 2; and 52% of the variance was explained when self-management behaviors were added at Step 3. In the final model, three variables were significant predictors: depressive symptoms, self-efficacy, and self-management behaviors. The individual and family self-management theory can serve as a cogent theory for understanding key concepts, processes, and outcomes essential to self-management in adolescents and families dealing with Type 1 diabetes mellitus.
Martin, J.; Runge, M.C.; Nichols, J.D.; Lubow, B.C.; Kendall, W.L.
2009-01-01
Thresholds and their relevance to conservation have become a major topic of discussion in the ecological literature. Unfortunately, in many cases the lack of a clear conceptual framework for thinking about thresholds may have led to confusion in attempts to apply the concept of thresholds to conservation decisions. Here, we advocate a framework for thinking about thresholds in terms of a structured decision making process. The purpose of this framework is to promote a logical and transparent process for making informed decisions for conservation. Specification of such a framework leads naturally to consideration of definitions and roles of different kinds of thresholds in the process. We distinguish among three categories of thresholds. Ecological thresholds are values of system state variables at which small changes bring about substantial changes in system dynamics. Utility thresholds are components of management objectives (determined by human values) and are values of state or performance variables at which small changes yield substantial changes in the value of the management outcome. Decision thresholds are values of system state variables at which small changes prompt changes in management actions in order to reach specified management objectives. The approach that we present focuses directly on the objectives of management, with an aim to providing decisions that are optimal with respect to those objectives. This approach clearly distinguishes the components of the decision process that are inherently subjective (management objectives, potential management actions) from those that are more objective (system models, estimates of system state). Optimization based on these components then leads to decision matrices specifying optimal actions to be taken at various values of system state variables. Values of state variables separating different actions in such matrices are viewed as decision thresholds. Utility thresholds are included in the objectives component, and ecological thresholds may be embedded in models projecting consequences of management actions. Decision thresholds are determined by the above-listed components of a structured decision process. These components may themselves vary over time, inducing variation in the decision thresholds inherited from them. These dynamic decision thresholds can then be determined using adaptive management. We provide numerical examples (that are based on patch occupancy models) of structured decision processes that include all three kinds of thresholds. ?? 2009 by the Ecological Society of America.
NASA Technical Reports Server (NTRS)
Sayers, R. S.
1972-01-01
An information management system is proposed for use in the space shuttle sortie, the modular space station, the tracking data relay satellite and associated ground support systems. Several different information management functions, including data acquisition, transfer, storage, processing, control and display are integrated in the system.
ERIC Educational Resources Information Center
Shea, Mary Lou; And Others
This learning module, which is part of a staff development program for health occupations clinical instructors, discusses the process of managing the physical clinical environment and students' experiences within the clinical environment. It includes learning activities dealing with various aspects of managing the physical environment and student…
ERIC Educational Resources Information Center
Lee, Stephen
2010-01-01
The purpose of this study was to evaluate the implementation of enrollment management at two public universities. The theoretical framework was conceptual and centered on the effectiveness of the implementation process as a pivotal factor in the development of a comprehensive enrollment management operation. This multi-site case study included 14…
Code of Federal Regulations, 2011 CFR
2011-04-01
... effective cash management or cost controls resulting in excess cash on hand; (11) Failure to ensure that a... consider the organization's history with regard to the management of other grants, including DOL grants... management system as required by Federal regulations; (4) Willful obstruction of the audit process; (5...
Schumacher, Karen L; Plano Clark, Vicki L; West, Claudia M; Dodd, Marylin J; Rabow, Michael W; Miaskowski, Christine
2014-11-01
Oncology patients with persistent pain treated in outpatient settings and their family caregivers have significant responsibility for managing pain medications. However, little is known about their practical day-to-day experiences with pain medication management. The aim was to describe day-to-day pain medication management from the perspectives of oncology outpatients and their family caregivers who participated in a randomized clinical trial of a psychoeducational intervention called the Pro-Self(©) Plus Pain Control Program. In this article, we focus on pain medication management by patients and family caregivers in the context of multiple complex health systems. We qualitatively analyzed audio-recorded intervention sessions that included extensive dialogue between patients, family caregivers, and nurses about pain medication management during the 10-week intervention. The health systems context for pain medication management included multiple complex systems for clinical care, reimbursement, and regulation of analgesic prescriptions. Pain medication management processes particularly relevant to this context were getting prescriptions and obtaining medications. Responsibilities that fell primarily to patients and family caregivers included facilitating communication and coordination among multiple clinicians, overcoming barriers to access, and serving as a final safety checkpoint. Significant effort was required of patients and family caregivers to insure safe and effective pain medication management. Health systems issues related to access to needed analgesics, medication safety in outpatient settings, and the effort expended by oncology patients and their family caregivers require more attention in future research and health-care reform initiatives. Copyright © 2014 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Falke, Stefan; Husar, Rudolf
2011-01-01
The goal of this REASoN applications and technology project is to deliver and use Earth Science Enterprise (ESE) data and tools in support of air quality management. Its scope falls within the domain of air quality management and aims to develop a federated air quality information sharing network that includes data from NASA, EPA, US States and others. Project goals were achieved through a access of satellite and ground observation data, web services information technology, interoperability standards, and air quality community collaboration. In contributing to a network of NASA ESE data in support of particulate air quality management, the project will develop access to distributed data, build Web infrastructure, and create tools for data processing and analysis. The key technologies used in the project include emerging web services for developing self describing and modular data access and processing tools, and service oriented architecture for chaining web services together to assemble customized air quality management applications. The technology and tools required for this project were developed within DataFed.net, a shared infrastructure that supports collaborative atmospheric data sharing and processing web services. Much of the collaboration was facilitated through community interactions through the Federation of Earth Science Information Partners (ESIP) Air Quality Workgroup. The main activities during the project that successfully advanced DataFed, enabled air quality applications and established community-oriented infrastructures were: develop access to distributed data (surface and satellite), build Web infrastructure to support data access, processing and analysis create tools for data processing and analysis foster air quality community collaboration and interoperability.
Pacheco, José Márcio da Cunha; Gomes, Romeu
2016-08-01
This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice.
Structured decision making for managing pneumonia epizootics in bighorn sheep
Sells, Sarah N.; Mitchell, Michael S.; Edwards, Victoria L.; Gude, Justin A.; Anderson, Neil J.
2016-01-01
Good decision-making is essential to conserving wildlife populations. Although there may be multiple ways to address a problem, perfect solutions rarely exist. Managers are therefore tasked with identifying decisions that will best achieve desired outcomes. Structured decision making (SDM) is a method of decision analysis used to identify the most effective, efficient, and realistic decisions while accounting for values and priorities of the decision maker. The stepwise process includes identifying the management problem, defining objectives for solving the problem, developing alternative approaches to achieve the objectives, and formally evaluating which alternative is most likely to accomplish the objectives. The SDM process can be more effective than informal decision-making because it provides a transparent way to quantitatively evaluate decisions for addressing multiple management objectives while incorporating science, uncertainty, and risk tolerance. To illustrate the application of this process to a management need, we present an SDM-based decision tool developed to identify optimal decisions for proactively managing risk of pneumonia epizootics in bighorn sheep (Ovis canadensis) in Montana. Pneumonia epizootics are a major challenge for managers due to long-term impacts to herds, epistemic uncertainty in timing and location of future epizootics, and consequent difficulty knowing how or when to manage risk. The decision tool facilitates analysis of alternative decisions for how to manage herds based on predictions from a risk model, herd-specific objectives, and predicted costs and benefits of each alternative. Decision analyses for 2 example herds revealed that meeting management objectives necessitates specific approaches unique to each herd. The analyses showed how and under what circumstances the alternatives are optimal compared to other approaches and current management. Managers can be confident that these decisions are effective, efficient, and realistic because they explicitly account for important considerations managers implicitly weigh when making decisions, including competing management objectives, uncertainty in potential outcomes, and risk tolerance.
The Design of a High Performance Earth Imagery and Raster Data Management and Processing Platform
NASA Astrophysics Data System (ADS)
Xie, Qingyun
2016-06-01
This paper summarizes the general requirements and specific characteristics of both geospatial raster database management system and raster data processing platform from a domain-specific perspective as well as from a computing point of view. It also discusses the need of tight integration between the database system and the processing system. These requirements resulted in Oracle Spatial GeoRaster, a global scale and high performance earth imagery and raster data management and processing platform. The rationale, design, implementation, and benefits of Oracle Spatial GeoRaster are described. Basically, as a database management system, GeoRaster defines an integrated raster data model, supports image compression, data manipulation, general and spatial indices, content and context based queries and updates, versioning, concurrency, security, replication, standby, backup and recovery, multitenancy, and ETL. It provides high scalability using computer and storage clustering. As a raster data processing platform, GeoRaster provides basic operations, image processing, raster analytics, and data distribution featuring high performance computing (HPC). Specifically, HPC features include locality computing, concurrent processing, parallel processing, and in-memory computing. In addition, the APIs and the plug-in architecture are discussed.
Adaptive management: The U.S. Department of the Interior technical guide
Williams, B K; Szaro, Robert C.; Shapiro, Carl D.
2009-01-01
The purpose of this technical guide is to present an operational definition of adaptive management, identify the conditions in which adaptive management should be considered, and describe the process of using adaptive management for managing natural resources. The guide is not an exhaustive discussion of adaptive management, nor does it include detailed specifications for individual projects. However, it should aid U.S. Department of the Interior (DOI) managers and practitioners in determining when and how to apply adaptive management. Adaptive management is framed within the context of structured decision making, with an emphasis on uncertainty about resource responses to management actions and the value of reducing that uncertainty to improve management. Though learning plays a key role in adaptive management, it is seen here as a means to an end, namely good management, and not an end in itself. The operational definition used in the guide is adopted from the National Research Council, which characterizes adaptive management as an iterative learning process producing improved understanding and improved management over time: Adaptive management [is a decision process that] promotes flexible decision making that can be adjusted in the face of uncertainties as outcomes from management actions and other events become better understood. Careful monitoring of these outcomes both advances scientific understanding and helps adjust policies or operations as part of an iterative learning process. Adaptive management also recognizes the importance of natural variability in contributing to ecological resilience and productivity. It is not a ‘trial and error’ process, but rather emphasizes learning while doing. Adaptive management does not represent an end in itself, but rather a means to more effective decisions and enhanced benefits. Its true measure is in how well it helps meet environmental, social, and economic goals, increases scientific knowledge, and reduces tensions among stakeholders. Adaptive management as defined here involves ongoing, real-time learning and knowledge creation, both in a substantive sense and in terms of the adaptive process itself. It is described in what follows in a series of 9 steps, as summarized in section 4.1, involving stakeholder involvement, management objectives, management alternatives, predictive models, monitoring plans, decision making, monitoring responses to management, assessment, and adjustment to management actions. An adaptive approach actively engages stakeholders in all phases of a project over its timeframe, facilitating mutual learning and reinforcing the commitment to learning-based management. Adaptive management in DOI is implemented within a legal context that includes statutory authorities such as the National Environmental Policy Act (NEPA), the Endangered Species Act, and the Federal Advisory Committee Act. For many important problems now facing the resource management community, adaptive management holds great promise in reducing the uncertainties that limit the effective management of natural resource systems. For many conservation and management problems, utilizing management itself in an experimental context may be the only feasible way to gain the system understanding needed to improve management. Though it is commonly thought that an adaptive approach can produce results quickly at low cost, the opposite is more likely to be true. An initial investment of time and effort will increase the likelihood of better decision making and resource stewardship in the future, but patience, flexibility, and support are needed over the life of an adaptive management project. For these reasons it is important to carefully consider the potential use of an adaptive approach, and to engage in careful planning and evaluation when adaptive management is used.
Natural Resource Information System. Volume 1: Overall description
NASA Technical Reports Server (NTRS)
1972-01-01
A prototype computer-based Natural Resource Information System was designed which could store, process, and display data of maximum usefulness to land management decision making. The system includes graphic input and display, the use of remote sensing as a data source, and it is useful at multiple management levels. A survey established current decision making processes and functions, information requirements, and data collection and processing procedures. The applications of remote sensing data and processing requirements were established. Processing software was constructed and a data base established using high-altitude imagery and map coverage of selected areas of SE Arizona. Finally a demonstration of system processing functions was conducted utilizing material from the data base.
Birds of a Feather: Supporting Secure Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Braswell III, H V
2006-04-24
Over the past few years Lawrence Livermore National Laboratory has begun the process of moving to a diskless environment in the Secure Computer Support realm. This movement has included many moving targets and increasing support complexity. We would like to set up a forum for Security and Support professionals to get together from across the Complex and discuss current deployments, lessons learned, and next steps. This would include what hardware, software, and hard copy based solutions are being used to manage Secure Computing. The topics to be discussed include but are not limited to: Diskless computing, port locking and management,more » PC, Mac, and Linux/UNIX support and setup, system imaging, security setup documentation and templates, security documentation and management, customer tracking, ticket tracking, software download and management, log management, backup/disaster recovery, and mixed media environments.« less
Ahluwalia, Sangeeta C; Harris, Benjamin J; Lewis, Valerie A; Colla, Carrie H
2018-06-01
To measure the extent to which accountable care organizations (ACOs) have adopted end-of-life (EOL) care planning processes and characterize those ACOs that have established processes related to EOL. This study uses data from three waves (2012-2015) of the National Survey of ACOs. Respondents were 397 ACOs participating in Medicare, Medicaid, and commercial ACO contracts. This is a cross-sectional survey study using multivariate ordered logit regression models. We measured the extent to which the ACO had adopted EOL care planning processes as well as organizational characteristics, including care management, utilization management, health informatics, and shared decision-making capabilities, palliative care, and patient-centered medical home experience. Twenty-one percent of ACOs had few or no EOL care planning processes, 60 percent had some processes, and 19.6 percent had advanced processes. ACOs with a hospital in their system (OR: 3.07; p = .01), and ACOs with advanced care management (OR: 1.43; p = .02), utilization management (OR: 1.58, p = .00), and shared decision-making capabilities (OR: 16.3, p = .000) were more likely to have EOL care planning processes than those with no hospital or few to no capabilities. There remains considerable room for today's ACOs to increase uptake of EOL care planning, possibly by leveraging existing care management, utilization management, and shared decision-making processes. © Health Research and Educational Trust.
Total Quality Management, DLA Finance Center
1989-07-01
ton. DC 20503. DATE 3. REPORT TYPE AND DATES COVERED SJuly 1989 4. TITLE AND SUBTIT’LE 5. FUNDING NUMBERS Total Quality Management , DLA Finance Center 6...1989 ~ D 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Continuous Process Improvement. ., I Management 16. PRICE CODE 17...CONCEPTS TQM BASICS Total Quality Management (TQM) is a concept which is based on the work of a variety of people in a variety of fields. It includes
Meta-manager: a requirements analysis.
Cook, J F; Rozenblit, J W; Chacko, A K; Martinez, R; Timboe, H L
1999-05-01
The digital imaging network-picture-archiving and communications system (DIN-PACS) will be implemented in ten sites within the Great Plains Regional Medical Command (GPRMC). This network of PACS and teleradiology technology over a shared T1 network has opened the door for round the clock radiology coverage of all sites. However, the concept of a virtual radiology environment poses new issues for military medicine. A new workflow management system must be developed. This workflow management system will allow us to efficiently resolve these issues including quality of care, availability, severe capitation, and quality of the workforce. The design process of this management system must employ existing technology, operate over various telecommunication networks and protocols, be independent of platform operating systems, be flexible and scaleable, and involve the end user at the outset in the design process for which it is developed. Using the unified modeling language (UML), the specifications for this new business management system were created in concert between the University of Arizona and the GPRMC. These specifications detail a management system operating through a common object request brokered architecture (CORBA) environment. In this presentation, we characterize the Meta-Manager management system including aspects of intelligence, interfacility routing, fail-safe operations, and expected improvements in patient care and efficiency.
Advanced Manufacturing Processes in the Motor Vehicle Industry
DOT National Transportation Integrated Search
1983-05-01
Advanced manufacturing processes, which include a range of automation and management techniques, are aiding U.S. motor vehicle manufacturers to reduce vehicle costs. This report discusses these techniques in general and their specific applications in...
75 FR 18788 - Malcolm Baldrige National Quality Award Panel of Judges
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
... prominent in the fields of quality, innovation, and performance management and appointed by the Secretary of... Award. The agenda will include: Review of the 2009 Judging Process, Baldrige Program and Judging Process...
NASA Astrophysics Data System (ADS)
Podimata, Marianthi V.; Yannopoulos, Panayotis C.
2015-04-01
Water managers, decision-makers, water practitioners and others involved in Integrated Water Resources Management often encounter the problem of finding a joint agreement among stakeholders concerning the management of a common water body. Handling conflict situations/disputes over water issues and finding an acceptable joint solution remain a thorny issue in water negotiation processes, since finding a formula for wise, fair and sustainable management of a water resource is a complex process that includes environmental, economic, technical, socio-political criteria and their uncertainties. Decision Support Systems and Adaptive Management are increasingly used in that direction. To assist decision makers in handling water disputes and execute negotiations, a conceptual tool is required. The Graph Model for Conflict Resolution is a Decision Support flexible tool for negotiation support regarding water conflicts. It includes efficient algorithms for estimating strategic moves of water stakeholders, even though there is a lack of detail concerning their real motives and prospects. It calculates the stability of their states and encourages what-if analyses. This paper presents a case study of water decision makers' evaluations concerning the management of up-coming technical infrastructure Peiros-Parapeiros Dam, in Achaia Region (Greece). The continuous consultations between institutions and representatives revealed that the formation of a joint agreement between stakeholders is not easy, due to arising conflicts and contradictions regarding the jurisdiction and legal status of the dam operator and the cost undertaking of the dam operation. This paper analyzes the positions of the parties involved in the consultation process and examines possible conflict resolution states, using GMCR II. This methodology tries to minimize uncertainty to a certain extent concerning the possible moves/decisions of involved parties regarding the operation and management of the dam by developing and simulating potential strategic interactions and multilateral negotiations and finding confidence-building cooperation schemes (cooperative arrangements) over water use and management.
NASA Technical Reports Server (NTRS)
Russell, Yvonne; Falsetti, Christine M.
1991-01-01
Customer requirements are presented through three viewgraphs. One graph presents the range of services, which include requirements management, network engineering, operations, and applications support. Another viewgraph presents the project planning process. The third viewgraph presents the programs and/or projects actively supported including life sciences, earth science and applications, solar system exploration, shuttle flight engineering, microgravity science, space physics, and astrophysics.
Sustainable intensification by managing microbial communities and processes in agroecosystems
USDA-ARS?s Scientific Manuscript database
By focusing on soil biology and biochemistry, agroecosystem management strategies are implemented which include reduced soil disturbance, diverse and adaptable crop rotations, retention of residue, and incorporation of livestock, cover crops, or both This systems approach is required to sustainably ...
Managing an Academic Library. Parts I and II.
ERIC Educational Resources Information Center
Werner, Gloria; Brudvig, Glenn
1985-01-01
Describes management experiences at University of California--Los Angeles (UCLA), University of Minnesota Biomedical Library, and California Institute of Technology. Discussions include development of ORION (UCLA's online technical processing and information system); organizational changes occurring as result of large-scale automation;…
Special Report: Part One. New Tools for Professionals.
ERIC Educational Resources Information Center
Liskin, Miriam; And Others
1984-01-01
This collection of articles includes an examination of word-processing software; project management software; new expert systems that turn microcomputers into logical, well-informed consultants; simulated negotiation software; telephone management systems; and the physical design of an efficient microcomputer work space. (MBR)
TECHNOLOGY TRANSFER HANDBOOK: MANAGEMENT OF WATER TREATMENT PLANT RESIDUALS
Potable water treatment processes produce safe drinking water and generate a wide variety of waste products known as residuals, including organic and inorganic compounds in liquid, solid, and gaseous forms. In the current regulatory climate, a complete management program for a w...
IRM in the Federal Government: Opinions and Reflections.
ERIC Educational Resources Information Center
Haney, Glenn P.
1989-01-01
Evaluates various aspects of federal information resources management and reviews technological changes within the Department of Agriculture to illustrate current issues and future trends in information resources management. Topics discussed include telecommunications and networking; distributed processing and field office automation; the role of…
48 CFR 1034.004 - Acquisition strategy.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Order, Task Order, or Interagency Agreement) to the overall investment requirements and management... investment; (3) A description of the effort, by acquisition, and the plans to include required clauses in the... requirements to manage the acquisition processes through the investment lifecycle; (7) Consideration of optimal...
Integrated Modeling Environment
NASA Technical Reports Server (NTRS)
Mosier, Gary; Stone, Paul; Holtery, Christopher
2006-01-01
The Integrated Modeling Environment (IME) is a software system that establishes a centralized Web-based interface for integrating people (who may be geographically dispersed), processes, and data involved in a common engineering project. The IME includes software tools for life-cycle management, configuration management, visualization, and collaboration.
Applications of image processing and visualization in the evaluation of murder and assault
NASA Astrophysics Data System (ADS)
Oliver, William R.; Rosenman, Julian G.; Boxwala, Aziz; Stotts, David; Smith, John; Soltys, Mitchell; Symon, James; Cullip, Tim; Wagner, Glenn
1994-09-01
Recent advances in image processing and visualization are of increasing use in the investigation of violent crime. The Digital Image Processing Laboratory at the Armed Forces Institute of Pathology in collaboration with groups at the University of North Carolina at Chapel Hill are actively exploring visualization applications including image processing of trauma images, 3D visualization, forensic database management and telemedicine. Examples of recent applications are presented. Future directions of effort include interactive consultation and image manipulation tools for forensic data exploration.
Landscape moderation of biodiversity patterns and processes - eight hypotheses.
Tscharntke, Teja; Tylianakis, Jason M; Rand, Tatyana A; Didham, Raphael K; Fahrig, Lenore; Batáry, Péter; Bengtsson, Janne; Clough, Yann; Crist, Thomas O; Dormann, Carsten F; Ewers, Robert M; Fründ, Jochen; Holt, Robert D; Holzschuh, Andrea; Klein, Alexandra M; Kleijn, David; Kremen, Claire; Landis, Doug A; Laurance, William; Lindenmayer, David; Scherber, Christoph; Sodhi, Navjot; Steffan-Dewenter, Ingolf; Thies, Carsten; van der Putten, Wim H; Westphal, Catrin
2012-08-01
Understanding how landscape characteristics affect biodiversity patterns and ecological processes at local and landscape scales is critical for mitigating effects of global environmental change. In this review, we use knowledge gained from human-modified landscapes to suggest eight hypotheses, which we hope will encourage more systematic research on the role of landscape composition and configuration in determining the structure of ecological communities, ecosystem functioning and services. We organize the eight hypotheses under four overarching themes. Section A: 'landscape moderation of biodiversity patterns' includes (1) the landscape species pool hypothesis-the size of the landscape-wide species pool moderates local (alpha) biodiversity, and (2) the dominance of beta diversity hypothesis-landscape-moderated dissimilarity of local communities determines landscape-wide biodiversity and overrides negative local effects of habitat fragmentation on biodiversity. Section B: 'landscape moderation of population dynamics' includes (3) the cross-habitat spillover hypothesis-landscape-moderated spillover of energy, resources and organisms across habitats, including between managed and natural ecosystems, influences landscape-wide community structure and associated processes and (4) the landscape-moderated concentration and dilution hypothesis-spatial and temporal changes in landscape composition can cause transient concentration or dilution of populations with functional consequences. Section C: 'landscape moderation of functional trait selection' includes (5) the landscape-moderated functional trait selection hypothesis-landscape moderation of species trait selection shapes the functional role and trajectory of community assembly, and (6) the landscape-moderated insurance hypothesis-landscape complexity provides spatial and temporal insurance, i.e. high resilience and stability of ecological processes in changing environments. Section D: 'landscape constraints on conservation management' includes (7) the intermediate landscape-complexity hypothesis-landscape-moderated effectiveness of local conservation management is highest in structurally simple, rather than in cleared (i.e. extremely simplified) or in complex landscapes, and (8) the landscape-moderated biodiversity versus ecosystem service management hypothesis-landscape-moderated biodiversity conservation to optimize functional diversity and related ecosystem services will not protect endangered species. Shifting our research focus from local to landscape-moderated effects on biodiversity will be critical to developing solutions for future biodiversity and ecosystem service management. © 2012 The Authors. Biological Reviews © 2012 Cambridge Philosophical Society.
The role of business process reengineering in health care.
Kohn, D
1994-02-01
Business process reengineering (BPR) is a management philosophy capturing attention in health care. It combines some new, old, and recycled management philosophies, and, more often than not, is yielding positive results. BPR's emphasis is on the streamlining of cross-functional processes to significantly reduce time and/or cost, increase revenue, improve quality and service, and reduce risk. Therefore, it has many applications in health care. This article provides an introduction to the concept of BPR, including the definition of BPR, its origin, its champions, and factors for its success.
Auditing emergency management programmes: Measuring leading indicators of programme performance.
Tomsic, Heather
Emergency Management Programmes benefit from review and measurement against established criteria. By measuring current vs required programme elements for their actual currency, completeness and effectiveness, the resulting timely reports of achievements and documentation of identified gaps can effectively be used to rationally support prioritised improvement. Audits, with their detailed, triangulated and objectively weighted processes, are the ultimate approach in terms of programme content measurement. Although Emergency Management is often presented as a wholly separate operational mechanism, distinct and functionally different from the organisation's usual management structure, this characterisation is only completely accurate while managing an emergency itself. Otherwise, an organisation's Emergency Management Programme is embedded within that organisation and dependent upon it. Therefore, the organisation's culture and structure of management, accountability and measurement must be engaged for the programme to exist, much less improve. A wise and successful Emergency Management Coordinator does not let the separate and distinct nature of managing an emergency obscure their realisation of the need for an organisation to understand and manage all of the other programme components as part of its regular business practices. This includes its measurement. Not all organisations are sufficiently large or capable of supporting the use of an audit. This paper proposes that alternate, less formal, yet effective mechanisms can be explored, as long as they reflect and support organisational management norms, including a process of relatively informal measurement focused on the organisation's own perception of key Emergency Management Programme performance indicators.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... IFQ cost recovery process. This action proposes regulatory changes to Sec. 648.294(h) to reconcile the... different aspects of the cost recovery fee collection process, including Payment Responsibility, IFQ Fee... process for appealing the cost recovery fee. Under the appeals process, an IFQ allocation permit holder...
Applications of Geomatics in Surface Mining
NASA Astrophysics Data System (ADS)
Blachowski, Jan; Górniak-Zimroz, Justyna; Milczarek, Wojciech; Pactwa, Katarzyna
2017-12-01
In terms of method of extracting mineral from deposit, mining can be classified into: surface, underground, and borehole mining. Surface mining is a form of mining, in which the soil and the rock covering the mineral deposits are removed. Types of surface mining include mainly strip and open-cast methods, as well as quarrying. Tasks associated with surface mining of minerals include: resource estimation and deposit documentation, mine planning and deposit access, mine plant development, extraction of minerals from deposits, mineral and waste processing, reclamation and reclamation of former mining grounds. At each stage of mining, geodata describing changes occurring in space during the entire life cycle of surface mining project should be taken into consideration, i.e. collected, analysed, processed, examined, distributed. These data result from direct (e.g. geodetic) and indirect (i.e. remote or relative) measurements and observations including airborne and satellite methods, geotechnical, geological and hydrogeological data, and data from other types of sensors, e.g. located on mining equipment and infrastructure, mine plans and maps. Management of such vast sources and sets of geodata, as well as information resulting from processing, integrated analysis and examining such data can be facilitated with geomatic solutions. Geomatics is a discipline of gathering, processing, interpreting, storing and delivering spatially referenced information. Thus, geomatics integrates methods and technologies used for collecting, management, processing, visualizing and distributing spatial data. In other words, its meaning covers practically every method and tool from spatial data acquisition to distribution. In this work examples of application of geomatic solutions in surface mining on representative case studies in various stages of mine operation have been presented. These applications include: prospecting and documenting mineral deposits, assessment of land accessibility for a potential large-scale surface mining project, modelling mineral deposit (granite) management, concept of a system for management of conveyor belt network technical condition, project of a geoinformation system of former mining terrains and objects, and monitoring and control of impact of surface mining on mine surroundings with satellite radar interferometry.
ERIC Educational Resources Information Center
Dalrymple, Prudence W.; Roderer, Nancy K.
1994-01-01
Highlights the changes that have occurred from 1987-93 in database access systems. Topics addressed include types of databases, including CD-ROMs; enduser interface; database selection; database access management, including library instruction and use of primary literature; economic issues; database users; the search process; and improving…
May, Stephen; Withers, Sarah; Reeve, Sarah; Greasley, Alison
2010-01-01
The aim of this study was to explore the clinical reasoning process used by novice physical therapists in specific patient problems. Nine physical therapists in the UK with limited experience of managing musculoskeletal problems were included. Semi-structured interviews were conducted on how novice physical therapists would assess and manage a patient with a shoulder problem; interviews were transcribed and analyzed using framework analysis. To be included as a final theme at least 50% of participants had to mention that theme. A large number of items (n = 93) were excluded as fewer than 50% of participants referred to each item. Included items related to seven main themes: history (16), physical exam (13), investigations (1), diagnostic reasoning (1), clinical reasoning process (diagnostic pathway) (3), clinical reasoning process (management pathway) (5) and treatment options (1). Items mostly related to information gathering, although there was some use of hypothetico-deductive clinical reasoning there appeared to be limited understanding of the clinical implications of data gathered, and clinical reasoning through use of pattern recognition was minimal. Major weaknesses were apparent in the clinical reasoning skills of these novice therapists compared to previous reports of expert clinical reasoning, indicating areas for development in the education of student and junior physical therapists. PMID:21655390
Designing cost effective water demand management programs in Australia.
White, S B; Fane, S A
2002-01-01
This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.
Repository-Based Software Engineering Program: Working Program Management Plan
NASA Technical Reports Server (NTRS)
1993-01-01
Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.
Saeid, Nazemi; Roudbari, Aliakbar; Yaghmaeian, Kamyar
2014-01-14
The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems.
ERIC Educational Resources Information Center
Brewer, Julie; And Others
1995-01-01
Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…
Reducing the Teacher Workforce: A Management Perspective.
ERIC Educational Resources Information Center
Collins, Philip; Nelson, Dorothy Q.
1983-01-01
Discusses substantive and procedural restraints, including legal pitfalls, due process, and no-layoff clauses, within which public employers must decide questions of reduction in workforce (RIF). Describes elements of a sound RIF policy and considers ways of using the collective bargaining process to facilitate the RIF process. (JBM)
Improving the medical records department processes by lean management.
Ajami, Sima; Ketabi, Saeedeh; Sadeghian, Akram; Saghaeinnejad-Isfahani, Sakine
2015-01-01
Lean management is a process improvement technique to identify waste actions and processes to eliminate them. The benefits of Lean for healthcare organizations are that first, the quality of the outcomes in terms of mistakes and errors improves. The second is that the amount of time taken through the whole process significantly improves. The purpose of this paper is to improve the Medical Records Department (MRD) processes at Ayatolah-Kashani Hospital in Isfahan, Iran by utilizing Lean management. This research was applied and an interventional study. The data have been collected by brainstorming, observation, interview, and workflow review. The study population included MRD staff and other expert staff within the hospital who were stakeholders and users of the MRD. The MRD were initially taught the concepts of Lean management and then formed into the MRD Lean team. The team then identified and reviewed the current processes subsequently; they identified wastes and values, and proposed solutions. The findings showed that the MRD units (Archive, Coding, Statistics, and Admission) had 17 current processes, 28 wastes, and 11 values were identified. In addition, they offered 27 comments for eliminating the wastes. The MRD is the critical department for the hospital information system and, therefore, the continuous improvement of its services and processes, through scientific methods such as Lean management, are essential. The study represents one of the few attempts trying to eliminate wastes in the MRD.
Integrating Personalized and Community Services for Mobile Travel Planning and Management
NASA Astrophysics Data System (ADS)
Yu, Chien-Chih
Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.
Magnetic Field Satellite (Magsat) data processing system specifications
NASA Technical Reports Server (NTRS)
Berman, D.; Gomez, R.; Miller, A.
1980-01-01
The software specifications for the MAGSAT data processing system (MDPS) are presented. The MDPS is divided functionally into preprocessing of primary input data, data management, chronicle processing, and postprocessing. Data organization and validity, and checks of spacecraft and instrumentation are dicussed. Output products of the MDPS, including various plots and data tapes, are described. Formats for important tapes are presented. Dicussions and mathematical formulations for coordinate transformations and field model coefficients are included.
Agricultural drainage and wetland management in Ontario.
Walters, Dan; Shrubsole, Dan
2003-12-01
Land drainage is recognized as an integral part of agricultural activity throughout the world. However, the increase in agricultural production has resulted in the loss of wetland functions and values. Therefore, wetland management and agricultural drainage illustrate the conflict between economic development and natural values. This research assesses the approval process for agricultural land drainage in Ontario, Canada, to determine how the benefits of increased agricultural production are balanced against the loss of wetland values. A permit review of drainage applications was conducted from 1978 to 1997 in Zorra Township, Ontario, Canada. Data collection also included the document reviews, interviews with government agencies and wetland evaluation files. The selected criteria include efficiency, equity, consistency and adequacy. The results indicate that while the process is efficient, fundamental problems remain with the bargaining process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ebberts, Blaine D.; Zelinsky, Ben D.; Karnezis, Jason P.
We successfully implemented and institutionalized an adaptive management (AM) process for the Columbia Estuary Ecosystem Restoration Program, which is a large-scale restoration program focused on improving ecosystem conditions in the 234-km lower Columbia River and estuary. For our purpose, “institutionalized” means the AM process and restoration program are embedded in the work flow of the implementing agencies and affected parties. While plans outlining frameworks, processes, or approaches to AM of ecosystem restoration programs are commonplace, establishment for the long term is not. This paper presents the basic AM framework and explains how AM was implemented and institutionalized. Starting with amore » common goal, we pursued included a well-understood governance and decision-making structure, routine coordination and communication activities, data and information sharing, commitment from partners and upper agency management to the AM process, and meaningful cooperation among program managers and partners. The overall approach and steps to implement and institutionalize AM for ecosystem restoration explained here are applicable to situations where it has been less than successful or, as in our case, the restoration program is just getting started.« less
Resolving a Prickly Situation: Involving Stakeholders in Invasive Cactus Management in South Africa
NASA Astrophysics Data System (ADS)
Novoa, Ana; Kaplan, Haylee; Wilson, John R. U.; Richardson, David M.
2016-05-01
The regulation and management of alien species can be contentious, particularly when the stakeholders who benefit from alien species are different from those who suffer the costs. We propose a consultative process involving relevant stakeholders in invasive species management decisions. The process involves (1) the identification of relevant stakeholders, (2) assessing their perceptions, (3) enhancing interaction between stakeholders, (4) assessing changes in stakeholders' perceptions following interactions with other stakeholders, and (5) developing management recommendations in collaboration with stakeholders. We demonstrate the application of the process using the family Cactaceae (`cacti') in South Africa. Many species of cacti have been introduced to the country over the past two centuries, mostly for horticulture, food and fodder, and hundreds of other species have been introduced in the past few decades (or are likely to be introduced soon) for horticulture. Using the proposed process enabled the negotiation and participation of all stakeholders in decision making and helped minimize contentious situations by clarifying stakeholder's beliefs and exploring consensus solutions. Consequently, management objectives were broadly supported by all stakeholders. These results will be included in a national cactus management strategy for South Africa.
Resolving a Prickly Situation: Involving Stakeholders in Invasive Cactus Management in South Africa.
Novoa, Ana; Kaplan, Haylee; Wilson, John R U; Richardson, David M
2016-05-01
The regulation and management of alien species can be contentious, particularly when the stakeholders who benefit from alien species are different from those who suffer the costs. We propose a consultative process involving relevant stakeholders in invasive species management decisions. The process involves (1) the identification of relevant stakeholders, (2) assessing their perceptions, (3) enhancing interaction between stakeholders, (4) assessing changes in stakeholders' perceptions following interactions with other stakeholders, and (5) developing management recommendations in collaboration with stakeholders. We demonstrate the application of the process using the family Cactaceae ('cacti') in South Africa. Many species of cacti have been introduced to the country over the past two centuries, mostly for horticulture, food and fodder, and hundreds of other species have been introduced in the past few decades (or are likely to be introduced soon) for horticulture. Using the proposed process enabled the negotiation and participation of all stakeholders in decision making and helped minimize contentious situations by clarifying stakeholder's beliefs and exploring consensus solutions. Consequently, management objectives were broadly supported by all stakeholders. These results will be included in a national cactus management strategy for South Africa.
Intelligent Sensors for Integrated Systems Health Management (ISHM)
NASA Technical Reports Server (NTRS)
Schmalzel, John L.
2008-01-01
IEEE 1451 Smart Sensors contribute to a number of ISHM goals including cost reduction achieved through: a) Improved configuration management (TEDS); and b) Plug-and-play re-configuration. Intelligent Sensors are adaptation of Smart Sensors to include ISHM algorithms; this offers further benefits: a) Sensor validation. b) Confidence assessment of measurement, and c) Distributed ISHM processing. Space-qualified intelligent sensors are possible a) Size, mass, power constraints. b) Bus structure/protocol.
Advances in the control and management of the southern pine bark beetles
T. Evan Nebeker
2004-01-01
Management of members of the southern pine bark beetle guild, which consists of five species, is a continually evolving process. A number of management strategies and tactics have remained fairly constant over time as new ones are being added. These basic practices include doing nothing, direct control, and indirect control. This chapter focuses primarily on the latter...
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
ERIC Educational Resources Information Center
Rist, Stephan; Chidambaranathan, Mani; Escobar, Cesar; Wiesmann, Urs; Zimmermann, Anne
2007-01-01
The present paper discusses a conceptual, methodological and practical framework within which the limitations of the conventional notion of natural resource management (NRM) can be overcome. NRM is understood as the application of scientific ecological knowledge to resource management. By including a consideration of the normative imperatives that…
USDA-ARS?s Scientific Manuscript database
The Soil and Water Assessment Tool (SWAT) model is widely used for simulation of hydrologic processes at various temporal and spatial scales. Less common are long-term simulation analyses of water balance components including agricultural management practices such as irrigation management. In the se...
R. Governo; B. G. Lockaby; Robert B. Rummer; C. Colson
2004-01-01
The purpose of this watershed study on three intermittent streams was to evaluate responses of riparian processes to three streamside management zone (SMZ) treatments; no harvest, clearcut, and partial hawest (50% basal area removal). Riparian response variables measured included litter$all, leaf litter decomposition, understory vegetation, soil temperature and water...
Maalouf, Amani; El-Fadel, Mutasem
2017-11-01
In this study, the carbon footprint of introducing a food waste disposer (FWD) policy was examined in the context of its implications on solid waste and wastewater management with economic assessment of environmental externalities emphasizing potential carbon credit and increased sludge generation. For this purpose, a model adopting a life cycle inventory approach was developed to integrate solid waste and wastewater management processes under a single framework and test scenarios for a waste with high organic food content typical of developing economies. For such a waste composition, the results show that a FWD policy can reduce emissions by nearly ∼42% depending on market penetration, fraction of food waste ground, as well as solid waste and wastewater management schemes, including potential energy recovery. In comparison to baseline, equivalent economic gains can reach ∼28% when environmental externalities including sludge management and emissions variations are considered. The sensitivity analyses on processes with a wide range in costs showed an equivalent economic impact thus emphasizing the viability of a FWD policy although the variation in the cost of sludge management exhibited a significant impact on savings. Copyright © 2017 Elsevier Ltd. All rights reserved.
A review of the fate of engineered nanomaterials in municipal solid waste streams.
Part, Florian; Berge, Nicole; Baran, Paweł; Stringfellow, Anne; Sun, Wenjie; Bartelt-Hunt, Shannon; Mitrano, Denise; Li, Liang; Hennebert, Pierre; Quicker, Peter; Bolyard, Stephanie C; Huber-Humer, Marion
2018-05-01
Significant knowledge and data gaps associated with the fate of product-embedded engineered nanomaterials (ENMs) in waste management processes exist that limit our current ability to develop appropriate end-of-life management strategies. This review paper was developed as part of the activities of the IWWG ENMs in Waste Task Group. The specific objectives of this review paper are to assess the current knowledge associated with the fate of ENMs in commonly used waste management processes, including key processes and mechanisms associated with ENM fate and transport in each waste management process, and to use that information to identify the data gaps and research needs in this area. Literature associated with the fate of ENMs in wastes was reviewed and summarized. Overall, results from this literature review indicate a need for continued research in this area. No work has been conducted to quantify ENMs present in discarded materials and an understanding of ENM release from consumer products under conditions representative of those found in relevant waste management process is needed. Results also indicate that significant knowledge gaps associated with ENM behaviour exist for each waste management process investigated. There is a need for additional research investigating the fate of different types of ENMs at larger concentration ranges with different surface chemistries. Understanding how changes in treatment process operation may influence ENM fate is also needed. A series of specific research questions associated with the fate of ENMs during the management of ENM-containing wastes have been identified and used to direct future research in this area. Copyright © 2018 Elsevier Ltd. All rights reserved.
Training Physicians in Palliative Care.
ERIC Educational Resources Information Center
Muir, J. Cameron; Krammer, Lisa M.; von Gunten, Charles F.
1999-01-01
Describes the elements of a program in hospice and palliative medicine that may serve as a model of an effective system of physician education. Topics for the palliative-care curriculum include hospice medicine, breaking bad news, pain management, the process of dying, and managing personal stress. (JOW)
Strategic plan to optimize the management of right-of-way parcel and utility information at FDOT.
DOT National Transportation Integrated Search
2013-05-01
The Florida Department of Transportation (FDOT) manages a huge right-of-way asset. Examples of core : processes related to this asset include determining right-of-way boundaries; inventorying roadside features; : preparing right-of-way maps; acquirin...
Strategies of Successful Technology Integrators. Part I: Streamlining Classroom Management.
ERIC Educational Resources Information Center
McNally, Lynn; Etchison, Cindy
2000-01-01
Discussion of how to develop curriculum that successfully integrates technology into elementary and secondary school classrooms focuses on solutions for school and classroom management tasks. Highlights include Web-based solutions; student activities; word processing; desktop publishing; draw and paint programs; spreadsheets; and database…
Teaching Business Management at the Secondary Level
ERIC Educational Resources Information Center
Brown, Betty J.
1978-01-01
A suggested secondary business curriculum for future entrepreneurs should include a foundations course in the private enterprise system and courses in accounting, distributive education, data processing, and perhaps business law, leading to a capstone course in small business management. Some career possibilities are also noted. (MF)
13 CFR 307.9 - Revolving Loan Fund Plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... lending area under § 307.18, a change in critical management staff, or a change to the strategic purpose...-approved economic development plan, if applicable, for the Region. (2) The Plan must identify the strategic... management procedures, including loan processing, underwriting, closing, disbursements, collections...
Calculating cost savings in utilization management.
MacMillan, Donna
2014-01-01
A major motivation for managing the utilization of laboratory testing is to reduce the cost of medical care. For this reason it is important to understand the basic principles of cost accounting in the clinical laboratory. The process of laboratory testing includes three distinct components termed the pre-analytic, analytic and post-analytic phases. Utilization management efforts may impact the cost structure of these three phases in different ways depending on the specific details of the initiative. Estimates of cost savings resulting from utilization management programs reported in the literature have often been fundamentally flawed due to a failure to understand basic concepts such as the difference between laboratory costs versus charges and the impact of reducing laboratory test volumes on the average versus marginal cost structure in the laboratory. This article will provide an overview of basic cost accounting principles in the clinical laboratory including both job order and process cost accounting. Specific examples will be presented to illustrate these concepts in various different scenarios. © 2013.
Approach of Decision Making Based on the Analytic Hierarchy Process for Urban Landscape Management
NASA Astrophysics Data System (ADS)
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Approach of decision making based on the analytic hierarchy process for urban landscape management.
Srdjevic, Zorica; Lakicevic, Milena; Srdjevic, Bojan
2013-03-01
This paper proposes a two-stage group decision making approach to urban landscape management and planning supported by the analytic hierarchy process. The proposed approach combines an application of the consensus convergence model and the weighted geometric mean method. The application of the proposed approach is shown on a real urban landscape planning problem with a park-forest in Belgrade, Serbia. Decision makers were policy makers, i.e., representatives of several key national and municipal institutions, and experts coming from different scientific fields. As a result, the most suitable management plan from the set of plans is recognized. It includes both native vegetation renewal in degraded areas of park-forest and continued maintenance of its dominant tourism function. Decision makers included in this research consider the approach to be transparent and useful for addressing landscape management tasks. The central idea of this paper can be understood in a broader sense and easily applied to other decision making problems in various scientific fields.
Revisit, revamp and revitalize your business plan: Part 4.
Waldron, David
2011-01-01
A best practice for all imaging leaders working on a management development program should be to invest enough time to complete a detailed planthatsetsgoals, objectives, step targets, landmarks, and a timetable for their achievements. Keys to success for a management development program include no surprises, active participation, and preparation by both the facilitator and the managers involved. A successful management team will have trained staff and lean processes mapped and documented, as well as be comfortable in a coaching, delegating, and consensus management style.
Malvey, Donna; Fottler, Myron D; Slovensky, Donna J
2002-01-01
In the highly competitive health care environment, the survival of an organization may depend on how well powerful stakeholders are managed. Yet, the existing strategic stakeholder management process does not include evaluation of stakeholder management performance. To address this critical gap, this paper proposes a systematic method for evaluation using a stakeholder report card. An example of a physician report card based on this methodology is presented.
Cartmill, Randi S; Walker, James M; Blosky, Mary Ann; Brown, Roger L; Djurkovic, Svetolik; Dunham, Deborah B; Gardill, Debra; Haupt, Marilyn T; Parry, Dean; Wetterneck, Tosha B; Wood, Kenneth E; Carayon, Pascale
2012-11-01
To examine the effect of implementing electronic order management on the timely administration of antibiotics to critical-care patients. We used a prospective pre-post design, collecting data on first-dose IV antibiotic orders before and after the implementation of an integrated electronic medication-management system, which included computerized provider order entry (CPOE), pharmacy order processing and an electronic medication administration record (eMAR). The research was performed in a 24-bed adult medical/surgical ICU in a large, rural, tertiary medical center. Data on the time of ordering, pharmacy processing and administration were prospectively collected and time intervals for each stage and the overall process were calculated. The overall turnaround time from ordering to administration significantly decreased from a median of 100 min before order management implementation to a median of 64 min after implementation. The first part of the medication use process, i.e., from order entry to pharmacy processing, improved significantly whereas no change was observed in the phase from pharmacy processing to medication administration. The implementation of an electronic order-management system improved the timeliness of antibiotic administration to critical-care patients. Additional system changes are required to further decrease the turnaround time. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
Integrated Risk Management Within NASA Programs/Projects
NASA Technical Reports Server (NTRS)
Connley, Warren; Rad, Adrian; Botzum, Stephen
2004-01-01
As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.
Woods, Phillip; Gapp, Rod; King, Michelle A
2015-01-01
Australian community pharmacies are experiencing challenges, including government prescription pricing reform and a dramatically increasing competitive environment. Enacting appropriate responsive actions requires capable pharmacy managers. 'Capability' implies managing effectively in the present, but with unknown or emerging contexts and with new problems. A conceptual understanding of managerial capability as practiced by pharmacist owner-managers is unavailable in the literature. This research aimed to address the question: How can we understand managerial capability in relation to effective community pharmacy management? The study's objective was to develop preliminary theoretical departure points for continuing research responding to the research question. The objective was approached by exploring how 5 top Australian pharmacy owner-managers accomplish the management of their businesses in a changing business environment. Qualitative research methods were employed to develop a social process perspective of how the managers enact their management practices. In-depth semi-structured life-world interviews were undertaken as the major method of data collection. Interview text thematic analysis was carried out identifying rich conceptual properties and dimensions, which 'dimensionalized' 3 key integrated categories. The findings show how the managers are immersed in their business, managerial and personal practices in a holistic and relational manner. Managerial processes, reported through three conceptual categories, their properties and dimensions, reveal the highly situational nature of the reality the managers were experiencing, including their need to express their personal/professional identity. The properties and dimensions of the category 'learning generatively' in particular, reveal how the pharmacy owner-managers shape their business activities and their emerging context as time passes. The preliminary interpretive view of managerial capability describes the phenomenon as an emergent human accomplishment rather than a possessed ability. This social process perspective enables the inclusion of context with time. The study acts as a formative departure point for continuing research of pharmacist managerial capability which seeks to better understand the linkage between 'knowing' and 'doing'. Copyright © 2015 Elsevier Inc. All rights reserved.
Speers, Christopher; Seth, Ajai Narain; Patel, Kiran Chhaganbhai; Rakhit, Dhrubo Jyoti; Gillett, Mark James
2017-12-14
Retrospectively analyze the cardiac assessment process for elite soccer players, and provide team physicians with a systematic guide to managing longitudinal cardiac risk. Descriptive Epidemiology Study. Cardiac assessments incorporating clinical examination, 12-lead ECG, echocardiography, and health questionnaire. Soccer players at 5 professional clubs in England, the United Kingdom. Data was retrospectively collected, inspected, and analyzed to determine their clinical management and subsequent follow-up. Over 2 years, 265 soccer players, aged 13 to 37 years with 66% of white European ethnicity, were included in the cohort. Eleven percent had "not-normal" assessments, of these assessments, 83% were considered gray screens, falling into three broad categories: structural cardiac features (including valvular abnormalities), functional cardiac features, and electrocardiogram changes. After cardiology consultation, all assessments were grouped into low, enhanced and high-risk categories for ongoing longitudinal risk management. Overall clear-cut pathology was identified in 2%. Cardiovascular assessment is a vital tool in identifying athletes at risk of sudden cardiac death to mitigate their risk through surveillance, intervention, or participation restriction. The decision whether a player is fit to play or not requires a robust risk assessment followed by input from a multidisciplinary team that includes both the team physician and cardiologist. This educational article proposes a clinical management pathway to aid clinicians with this process. Sudden cardiac death is the important medical cause of death during exercise. The team physician should assume responsibility for the management of the longitudinal risk of their players' cardiac assessments in conjunction with sports cardiologist.
Rojo, Marcial García; Rolón, Elvira; Calahorra, Luis; García, Felix Oscar; Sánchez, Rosario Paloma; Ruiz, Francisco; Ballester, Nieves; Armenteros, María; Rodríguez, Teresa; Espartero, Rafael Martín
2008-07-15
Process orientation is one of the essential elements of quality management systems, including those in use in healthcare. Business processes in hospitals are very complex and variable. BPMN (Business Process Modelling Notation) is a user-oriented language specifically designed for the modelling of business (organizational) processes. Previous experiences of the use of this notation in the processes modelling within the Pathology in Spain or another country are not known. We present our experience in the elaboration of the conceptual models of Pathology processes, as part of a global programmed surgical patient process, using BPMN. With the objective of analyzing the use of BPMN notation in real cases, a multidisciplinary work group was created, including software engineers from the Dep. of Technologies and Information Systems from the University of Castilla-La Mancha and health professionals and administrative staff from the Hospital General de Ciudad Real. The work in collaboration was carried out in six phases: informative meetings, intensive training, process selection, definition of the work method, process describing by hospital experts, and process modelling. The modelling of the processes of Anatomic Pathology is presented using BPMN. The presented subprocesses are those corresponding to the surgical pathology examination of the samples coming from operating theatre, including the planning and realization of frozen studies. The modelling of Anatomic Pathology subprocesses has allowed the creation of an understandable graphical model, where management and improvements are more easily implemented by health professionals.
Rojo, Marcial García; Rolón, Elvira; Calahorra, Luis; García, Felix Óscar; Sánchez, Rosario Paloma; Ruiz, Francisco; Ballester, Nieves; Armenteros, María; Rodríguez, Teresa; Espartero, Rafael Martín
2008-01-01
Background Process orientation is one of the essential elements of quality management systems, including those in use in healthcare. Business processes in hospitals are very complex and variable. BPMN (Business Process Modelling Notation) is a user-oriented language specifically designed for the modelling of business (organizational) processes. Previous experiences of the use of this notation in the processes modelling within the Pathology in Spain or another country are not known. We present our experience in the elaboration of the conceptual models of Pathology processes, as part of a global programmed surgical patient process, using BPMN. Methods With the objective of analyzing the use of BPMN notation in real cases, a multidisciplinary work group was created, including software engineers from the Dep. of Technologies and Information Systems from the University of Castilla-La Mancha and health professionals and administrative staff from the Hospital General de Ciudad Real. The work in collaboration was carried out in six phases: informative meetings, intensive training, process selection, definition of the work method, process describing by hospital experts, and process modelling. Results The modelling of the processes of Anatomic Pathology is presented using BPMN. The presented subprocesses are those corresponding to the surgical pathology examination of the samples coming from operating theatre, including the planning and realization of frozen studies. Conclusion The modelling of Anatomic Pathology subprocesses has allowed the creation of an understandable graphical model, where management and improvements are more easily implemented by health professionals. PMID:18673511
Assessment of reservoir system variable forecasts
NASA Astrophysics Data System (ADS)
Kistenmacher, Martin; Georgakakos, Aris P.
2015-05-01
Forecast ensembles are a convenient means to model water resources uncertainties and to inform planning and management processes. For multipurpose reservoir systems, forecast types include (i) forecasts of upcoming inflows and (ii) forecasts of system variables and outputs such as reservoir levels, releases, flood damage risks, hydropower production, water supply withdrawals, water quality conditions, navigation opportunities, and environmental flows, among others. Forecasts of system variables and outputs are conditional on forecasted inflows as well as on specific management policies and can provide useful information for decision-making processes. Unlike inflow forecasts (in ensemble or other forms), which have been the subject of many previous studies, reservoir system variable and output forecasts are not formally assessed in water resources management theory or practice. This article addresses this gap and develops methods to rectify potential reservoir system forecast inconsistencies and improve the quality of management-relevant information provided to stakeholders and managers. The overarching conclusion is that system variable and output forecast consistency is critical for robust reservoir management and needs to be routinely assessed for any management model used to inform planning and management processes. The above are demonstrated through an application from the Sacramento-American-San Joaquin reservoir system in northern California.
2006-06-23
KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis
Materials management information systems.
1996-01-01
The hospital materials management function--ensuring that goods and services get from a source to an end user--encompasses many areas of the hospital and can significantly affect hospital costs. Performing this function in a manner that will keep costs down and ensure adequate cash flow requires effective management of a large amount of information from a variety of sources. To effectively coordinate such information, most hospitals have implemented some form of materials management information system (MMIS). These systems can be used to automate or facilitate functions such as purchasing, accounting, inventory management, and patient supply charges. In this study, we evaluated seven MMISs from seven vendors, focusing on the functional capabilities of each system and the quality of the service and support provided by the vendor. This Evaluation is intended to (1) assist hospitals purchasing an MMIS by educating materials managers about the capabilities, benefits, and limitations of MMISs and (2) educate clinical engineers and information system managers about the scope of materials management within a healthcare facility. Because software products cannot be evaluated in the same manner as most devices typically included in Health Devices Evaluations, our standard Evaluation protocol was not applicable for this technology. Instead, we based our ratings on our observations (e.g., during site visits), interviews we conducted with current users of each system, and information provided by the vendor (e.g., in response to a request for information [RFI]). We divided the Evaluation into the following sections: Section 1. Responsibilities and Information Requirements of Materials Management: Provides an overview of typical materials management functions and describes the capabilities, benefits, and limitations of MMISs. Also includes the supplementary article, "Inventory Cost and Reimbursement Issues" and the glossary, "Materials Management Terminology." Section 2. The MMIS Selection Process: Outlines steps to follow and describes factors to consider when selecting an MMIS. Also includes our Materials Management Process Evaluation and Needs Assessment Worksheet (which is also available online through ECRInet(TM)) and a list of suggested interview questions to be used when gathering user experience information for systems under consideration. Section 3A. MMIS Vendor Profiles: Presents information for the evaluated systems in a standardized, easy-to-compare format. Profiles include an Executive Summary describing our findings, a discussion of user comments, a listing of MMIS specifications, and information on the vendor's business background. Section 3B. Discussion of Vendor Profile Conclusions and Ratings: Presents our ratings and summarizes our rationale for all evaluated systems. Also includes a blank Vendor Profile Template to be used when gathering information on other vendors and systems. We found that, in general, all of the evaluated systems are able to meet most of the functional needs of a materials management department. However, we did uncover significant differences in the quality of service and support provided by each vendor, and our ratings reflect these differences: we rated two of the systems Acceptable--Preferred and four of the systems Acceptable. We have not yet rated the seventh system because our user experience information may not reflect the vendor's new ownership and management. When this vendor provides the references we requested, we will interview users and supply a rating. We caution readers against basing purchasing decisions solely on our ratings. Each hospital must consider the unique needs of its users and its overall strategic plans--a process that can be aided by using our Process Evaluation and Needs Assessment Worksheet. Our conclusions can then be used to narrow down the number of vendors under consideration...
An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach.
Bai, Libiao; Wang, Hailing; Huang, Ning; Du, Qiang; Huang, Youdan
2018-06-23
The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP) based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP) environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP)-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.
Bamford, Claire; Poole, Marie; Brittain, Katie; Chew-Graham, Carolyn; Fox, Chris; Iliffe, Steve; Manthorpe, Jill; Robinson, Louise
2014-11-08
Case management has been suggested as a way of improving the quality and cost-effectiveness of support for people with dementia. In this study we adapted and implemented a successful United States' model of case management in primary care in England. The results are reported elsewhere, but a key finding was that little case management took place. This paper reports the findings of the process evaluation which used Normalization Process Theory to understand the barriers to implementation. Ethnographic methods were used to explore the views and experiences of case management. Interviews with 49 stakeholders (patients, carers, case managers, health and social care professionals) were supplemented with observation of case managers during meetings and initial assessments with patients. Transcripts and field notes were analysed initially using the constant comparative approach and emerging themes were then mapped onto the framework of Normalization Process Theory. The primary focus during implementation was on the case managers as isolated individuals, with little attention being paid to the social or organizational context within which they worked. Barriers relating to each of the four main constructs of Normalization Process Theory were identified, with a lack of clarity over the scope and boundaries of the intervention (coherence); variable investment in the intervention (cognitive participation); a lack of resources, skills and training to deliver case management (collective action); and limited reflection and feedback on the case manager role (reflexive monitoring). Despite the intuitive appeal of case management to all stakeholders, there were multiple barriers to implementation in primary care in England including: difficulties in embedding case managers within existing well-established community networks; the challenges of protecting time for case management; and case managers' inability to identify, and act on, emerging patient and carer needs (an essential, but previously unrecognised, training need). In the light of these barriers it is unclear whether primary care is the most appropriate setting for case management in England. The process evaluation highlights key aspects of implementation and training to be addressed in future studies of case management for dementia.
Koontz, Tomas M; Bodine, Jennifer
2008-02-01
Ecosystem management was formally adopted over a decade ago by many U.S. natural resource agencies, including the Forest Service and the Bureau of Land Management. This approach calls for management based on stakeholder collaboration; interagency cooperation; integration of scientific, social, and economic information; preservation of ecological processes; and adaptive management. Results of previous studies indicate differences in the extent to which particular components of ecosystem management would be implemented within the U.S. Forest Service and the Bureau of Land Management and suggest a number of barriers thought to impede implementation. Drawing on survey and interview data from agency personnel and stakeholders, we compared levels of ecosystem-management implementation in the Forest Service and Bureau of Land Management and identified the most important barriers to implementation. Agency personnel perceived similarly high levels of implementation on many ecosystem-management components, whereas stakeholders perceived lower levels. Agencies were most challenged by implementation of preservation of ecological processes, adaptive management, and integration of social and economic information, whereas the most significant barriers to implementation were political, cultural, and legal.
Sustainable wetland management and support of ecosystem services
Smith, Loren M.; Euliss, Ned H.; Wilcox, Douglas A.; Brinson, Mark M.
2009-01-01
This article is a follow-up on a previous piece in the National Wetlands Newsletter in which we outlined problems associated with a static, local approach to wetland management versus an alternative that proposes a temporal and geomorphic approach (Euliss et al. 2009). We extend that concept by drawing on companion papers recently published in the journal Wetlands (Euliss et al. 2008, Smith et al. 2008). Here we highlight reasons for the failure of many managed wetlands to provide a suite of ecosystem services (e.g., carbon storage, diodiversity, ground-water recharge, contaminant filtering, floodwater storage). Our principal theme is that wetland management is best approached by giving consideration to the hydrogeomorphic processes that maintain productive ecosystems and by removing physical and social impediments to those processes. Traditional management actions are often oriented toward maintaining static conditions in wetlands without considering the temporal cycles that wetlands need to undergo or achieve productivity for specific groups of wildlife, such as waterfowl. Possibly more often, a manager's ability to influence hydrogeomorphic processes is restricted by activities in surrounding watersheds. These could be dams, for example, which do not allow management of flood-pulse processes essential to productivity of riparian systems. In most cases, sediments and nutrients associated with land use in contributing watersheds complicate management of wetlands for a suite of services, including wildlife. Economic or policy forces far-removed from a wetland often interact to prevent occurrence of basic ecosystem processes. Our message is consistent with recommendation of supply-side sustainability of Allen et al. (2002) in which ecosystems are managed "for the system that produces outputs rather than the outputs themselves."
Exemplars in the use of technology for management of depression in primary care.
Serrano, Neftali; Molander, Rachel; Monden, Kimberley; Grosshans, Ashley; Krahn, Dean D
2012-06-01
Depression care management as part of larger efforts to integrate behavioral health care into primary care has been shown to be effective in helping patients and primary care clinicians achieve improved outcomes within the primary care environment. Central to care management systems is the use of registries which enable effective clinic population management. The aim of this article is to detail the methods and utility of technology in depression care management processes while also highlighting the real-world variations and barriers that exist in different clinical environments, namely a federally qualified health center and a Veterans Administration clinic. We analyzed descriptive data from the registries of Access Community Health Centers and the William S. Middleton Veterans Administration clinics along with historical reviews of their respective care management processes. Both registry reviews showed trend data indicating improvement in scores of depression and provided baseline data on important system variables, such as the number of patients who are not making progress, the percentage of patients who are unreachable by phone, and the kind of actions needed to ensure evidence-based and efficient care. Both sites also highlighted systemic technical barriers to more complete implementation of care management processes. Care management processes are an effective and efficient part of population-based care for depression in primary care. Implementation depends on available resources including hardware, software, and clinical personnel. Additionally, care management processes and technology have evolved over time based on local needs and are part of an integrated method to support the work of primary care clinicians in providing care for patients with depression.
A proposed group management scheme for XTP multicast
NASA Technical Reports Server (NTRS)
Dempsey, Bert J.; Weaver, Alfred C.
1990-01-01
The purpose of a group management scheme is to enable its associated transfer layer protocol to be responsive to user determined reliability requirements for multicasting. Group management (GM) must assist the client process in coordinating multicast group membership, allow the user to express the subset of the multicast group that a particular multicast distribution must reach in order to be successful (reliable), and provide the transfer layer protocol with the group membership information necessary to guarantee delivery to this subset. GM provides services and mechanisms that respond to the need of the client process or process level management protocols to coordinate, modify, and determine attributes of the multicast group, especially membership. XTP GM provides a link between process groups and their multicast groups by maintaining a group membership database that identifies members in a name space understood by the underlying transfer layer protocol. Other attributes of the multicast group useful to both the client process and the data transfer protocol may be stored in the database. Examples include the relative dispersion, most recent update, and default delivery parameters of a group.
Real association of factors with inappropriate hospital days.
Huet, Bernard; Cauterman, Maxime
2005-01-01
Several studies of inappropriate (in the sense of the AEP) hospital days highlighted associations between two factors (rate of inappropriateness and reasons for inappropriateness, rate of inappropriateness and appropriate setting of care,..). The aim of this communication is to present a study on real associations, at constant factor, between five factors associated with hospital inappropriate days: medical management process, reason for inappropriateness, scheduled admission, rate of inappropriateness, length of stay. We used the European version of Appropriateness Evaluation Protocol for evaluation of inappropriate days and the French protocol ;for analysis of inappropriate days. The study set in three Parisian hospitals, four clinical departments, three specialities. 523 patients were included in the study, 5663 days were evaluated on a wide variety of pathologies: 27 Medical Management Processes. Results show that there are real associations (elimination of transitive associations) between five factors : medical management process and discharge processes, reason for inappropriateness, scheduled admission, rate of inappropriate days, length of stay. Multiple Correspondence Analysis on all "groups of contiguous days related with the same reason for inappropriateness" shows five profiles of queues integrating various medical management processes.
An Introduction to Flight Software Development: FSW Today, FSW 2010
NASA Technical Reports Server (NTRS)
Gouvela, John
2004-01-01
Experience and knowledge gained from ongoing maintenance of Space Shuttle Flight Software and new development projects including Cockpit Avionics Upgrade are applied to projected needs of the National Space Exploration Vision through Spiral 2. Lessons learned from these current activities are applied to create a sustainable, reliable model for development of critical software to support Project Constellation. This presentation introduces the technologies, methodologies, and infrastructure needed to produce and sustain high quality software. It will propose what is needed to support a Vision for Space Exploration that places demands on the innovation and productivity needed to support future space exploration. The technologies in use today within FSW development include tools that provide requirements tracking, integrated change management, modeling and simulation software. Specific challenges that have been met include the introduction and integration of Commercial Off the Shelf (COTS) Real Time Operating System for critical functions. Though technology prediction has proved to be imprecise, Project Constellation requirements will need continued integration of new technology with evolving methodologies and changing project infrastructure. Targets for continued technology investment are integrated health monitoring and management, self healing software, standard payload interfaces, autonomous operation, and improvements in training. Emulation of the target hardware will also allow significant streamlining of development and testing. The methodologies in use today for FSW development are object oriented UML design, iterative development using independent components, as well as rapid prototyping . In addition, Lean Six Sigma and CMMI play a critical role in the quality and efficiency of the workforce processes. Over the next six years, we expect these methodologies to merge with other improvements into a consolidated office culture with all processes being guided by automated office assistants. The infrastructure in use today includes strict software development and configuration management procedures, including strong control of resource management and critical skills coverage. This will evolve to a fully integrated staff organization with efficient and effective communication throughout all levels guided by a Mission-Systems Architecture framework with focus on risk management and attention toward inevitable product obsolescence. This infrastructure of computing equipment, software and processes will itself be subject to technological change and need for management of change and improvement,
33 CFR 385.12 - Pilot projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...
Integrated Communications at America's Leading Total Quality Management Corporations.
ERIC Educational Resources Information Center
Gronstedt, Anders
1996-01-01
Examines how to create organizational processes that allow communication professionals with a variety of expertise to support each other through coordination and integration. Studies eight of America's leading total quality management corporations, including AT&T, Federal Express, Saturn, and Xerox. Explores how various total quality…
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
Collaboration in national forest management
Susan Charnley; Jonathan W. Long; Frank K. Lake
2014-01-01
National forest management efforts have generally moved toward collaborative and participatory approaches at a variety of scales. This includes, at a larger scale, greater public participation in transparent and inclusive democratic processes and, at a smaller scale, more engagement with local communities. Participatory approaches are especially important for an all-...
Benchmark for Strategic Performance Improvement.
ERIC Educational Resources Information Center
Gohlke, Annette
1997-01-01
Explains benchmarking, a total quality management tool used to measure and compare the work processes in a library with those in other libraries to increase library performance. Topics include the main groups of upper management, clients, and staff; critical success factors for each group; and benefits of benchmarking. (Author/LRW)
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
33 CFR 385.19 - Environmental and economic equity.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...
75 FR 2488 - Mid-Atlantic Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-15
... Mid-Atlantic Fishery Management Council's (MAFMC) Scientific and Statistical Committee (SSC) will hold... include new member orientation (overview of Council process and role of the SSC), review and adoption of SSC Standard Operating Practices and Procedures, ABC Control Rule Framework and Council Risk Policy...
43 CFR 3420.3-1 - Area identification process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) COMPETITIVE LEASING Competitive Leasing... tracts that meet the leasing level established by the Secretary, and identify all alternative tract..., including: (1) The regional coal team meeting to recommend initial leasing levels (see § 3420.2(a)(4)); (2...
NASA Technical Reports Server (NTRS)
2004-01-01
NASA's complex and highly technical missions rely on effective project teams and managers. Since 1993, through its Project Management Development Process (PMDP), the Academy of Program and Project Leadership (APPL) has offered direction to the Agency's project practitioners as they advance in their careers. PMDP helps identify and sequence professional experiences, courses, and other project-based learning experiences that support individual career goals and center activities by outlining competencies at four levels of development. The result is that PMDP provides NASA project practitioners with a road map to the knowledge and competencies appropriate for their job and the jobs to which they aspire. Plus, new this year, APPL has rolled out its electronic Project Management Development Process (ePMDP) tool, a learning management system that includes a dynamic presentation of the PMDP levels, competency areas, competency organizational structures, Individual Development Plans (IDP), and online PMDP enrollment. APPL's website, www.appl.nasa.gov, provides access to ePMDP as well as other online resources for NASA practitioners enrolled in the Project Management Development Process.
Application of Risk Assessment Tools in the Continuous Risk Management (CRM) Process
NASA Technical Reports Server (NTRS)
Ray, Paul S.
2002-01-01
Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) is currently implementing the Continuous Risk Management (CRM) Program developed by the Carnegie Mellon University and recommended by NASA as the Risk Management (RM) implementation approach. The four most frequently used risk assessment tools in the center are: (a) Failure Modes and Effects Analysis (FMEA), Hazard Analysis (HA), Fault Tree Analysis (FTA), and Probabilistic Risk Analysis (PRA). There are some guidelines for selecting the type of risk assessment tools during the project formulation phase of a project, but there is not enough guidance as to how to apply these tools in the Continuous Risk Management process (CRM). But the ways the safety and risk assessment tools are used make a significant difference in the effectiveness in the risk management function. Decisions regarding, what events are to be included in the analysis, to what level of details should the analysis be continued, make significant difference in the effectiveness of risk management program. Tools of risk analysis also depends on the phase of a project e.g. at the initial phase of a project, when not much data are available on hardware, standard FMEA cannot be applied; instead a functional FMEA may be appropriate. This study attempted to provide some directives to alleviate the difficulty in applying FTA, PRA, and FMEA in the CRM process. Hazard Analysis was not included in the scope of the study due to the short duration of the summer research project.
Lopes, Carla; Antelo, Luis T; Franco-Uría, Amaya; Alonso, Antonio A; Pérez-Martín, Ricardo
2015-12-01
Reuse and valorisation of fish by-products is a key process for marine resources conservation. Usually, fishmeal and oil processing factories collect the by-products generated by fishing port and industry processing activities, producing an economical benefit to both parts. In the same way, different added-value products can be recovered by the valorisation industries whereas fishing companies save the costs associated with the management of those wastes. However, it is important to estimate the advantages of valorisation processes not only in terms of economic income, but also considering the environmental impacts. This would help to know if the valorisation of a residue provokes higher impact than other waste management options, which means that its advantages are probably not enough for guarantying a sustainable waste reuse. To that purpose, there are several methodologies to evaluate the environmental impacts of processes, including those of waste management, providing different indicators which give information on relevant environmental aspects. In the current study, a comparative environmental assessment between a valorisation process (fishmeal and oil production) and different waste management scenarios (composting, incineration and landfilling) was developed. This comparison is a necessary step for the development and industrial implementation of these processes as the best alternative treatment for fish by-products. The obtained results showed that both valorisation process and waste management treatments presented similar impacts. However, a significant benefit can be achieved through valorisation of fish by-products. Additionally, the implications of the possible presence of pollutants were discussed. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Space Engineering Research Center for Utilization of Local Planetary Resources
NASA Technical Reports Server (NTRS)
Ramohalli, Kumar; Lewis, John S.
1989-01-01
Progress toward the goal of exploiting extraterrestrial resources for space missions is documented. Some areas of research included are as follows: Propellant and propulsion optimization; Automation of propellant processing with quantitative simulation; Ore reduction through chlorination and free radical production; Characterization of lunar ilmenite and its simulants; Carbothermal reduction of ilmenite with special reference to microgravity chemical reactor design; Gaseous carbonyl extraction and purification of ferrous metals; Overall energy management; and Information management for space processing.
Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. Options to treat, package, and store this material are discussed. The material included in this EIS consists of approximately 68 metric tons heavy metal (MTHM) of spent nuclear fuel 20 MTHM of aluminum-based spent nuclear fuel at SRS, as much as 28 MTHM of aluminum-clad spent nuclear fuel from foreign andmore » domestic research reactors to be shipped to SRS through 2035, and 20 MTHM of stainless-steel or zirconium-clad spent nuclear fuel and some Americium/Curium Targets stored at SRS. Alternatives considered in this EIS encompass a range of new packaging, new processing, and conventional processing technologies, as well as the No Action Alternative. A preferred alternative is identified in which DOE would prepare about 97% by volume (about 60% by mass) of the aluminum-based fuel for disposition using a melt and dilute treatment process. The remaining 3% by volume (about 40% by mass) would be managed using chemical separation. Impacts are assessed primarily in the areas of water resources, air resources, public and worker health, waste management, socioeconomic, and cumulative impacts.« less
Crisis management aspects of bam catastrophic earthquake: review article.
Sadeghi-Bazargani, Homayoun; Azami-Aghdash, Saber; Kazemi, Abdolhassan; Ziapour, Behrad
2015-01-01
Bam earthquake was the most catastrophic natural disasters in recent years. The aim of this study was to review different aspects of crisis management during and after the catastrophic earthquake in Bam City, Iran. Data needed for this systematic review were collected through searching PubMed, EMBASE and SID databases, for the period from 2003 to 2011. Keywords included earthquake, Iran and Bam earthquake. The data were summarized and were analyzed using Content Analysis. Out of 422 articles, 25 articles were included in the study. Crisis Management aspects and existing pitfalls were classified into seven categories including planning and organization, human resource management, management of logistics, international humanitarian aids, field performance of the military and security forces, health and medical service provision, and information management. Positive aspects and major pitfalls of crisis management have been introduced in all the mentioned categories. The available evidence indicated poor crisis management during Bam earthquake that resulted in aggravating the losses as well as diminishing the effect of interventions. Thus, concerning the importance of different aspects of the crisis management and the high prevalence of disasters in Iran, the observed vulnerability in disaster management process should be addressed.
JPL Project Information Management: A Continuum Back to the Future
NASA Technical Reports Server (NTRS)
Reiz, Julie M.
2009-01-01
This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.
Management of the water balance and quality in mining areas
NASA Astrophysics Data System (ADS)
Pasanen, Antti; Krogerus, Kirsti; Mroueh, Ulla-Maija; Turunen, Kaisa; Backnäs, Soile; Vento, Tiia; Veijalainen, Noora; Hentinen, Kimmo; Korkealaakso, Juhani
2015-04-01
Although mining companies have long been conscious of water related risks they still face environmental management problems. These problems mainly emerge because mine sites' water balances have not been adequately assessed in the stage of the planning of mines. More consistent approach is required to help mining companies identify risks and opportunities related to the management of water resources in all stages of mining. This approach requires that the water cycle of a mine site is interconnected with the general hydrologic water cycle. In addition to knowledge on hydrological conditions, the control of the water balance in the mining processes require knowledge of mining processes, the ability to adjust process parameters to variable hydrological conditions, adaptation of suitable water management tools and systems, systematic monitoring of amounts and quality of water, adequate capacity in water management infrastructure to handle the variable water flows, best practices to assess the dispersion, mixing and dilution of mine water and pollutant loading to receiving water bodies, and dewatering and separation of water from tailing and precipitates. WaterSmart project aims to improve the awareness of actual quantities of water, and water balances in mine areas to improve the forecasting and the management of the water volumes. The study is executed through hydrogeological and hydrological surveys and online monitoring procedures. One of the aims is to exploit on-line water quantity and quality monitoring for the better management of the water balances. The target is to develop a practical and end-user-specific on-line input and output procedures. The second objective is to develop mathematical models to calculate combined water balances including the surface, ground and process waters. WSFS, the Hydrological Modeling and Forecasting System of SYKE is being modified for mining areas. New modelling tools are developed on spreadsheet and system dynamics platforms to systematically integrate all water balance components (groundwater, surface water, infiltration, precipitation, mine water facilities and operations etc.) into overall dynamic mine site considerations. After coupling the surface and ground water models (e.g. Feflow and WSFS) with each other, they are compared with Goldsim. The third objective is to integrate the monitoring and modelling tools into the mine management system and process control. The modelling and predictive process control can prevent flood situations, ensure water adequacy, and enable the controlled mine water treatment. The project will develop a constantly updated management system for water balance including both natural waters and process waters.
A systems engineering management approach to resource management applications
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda Shaller
1989-01-01
The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.
An integrated operational definition and conceptual model of asthma self-management in teens.
Mammen, Jennifer; Rhee, Hyekyun; Norton, Sally A; Butz, Arlene M; Halterman, Jill S; Arcoleo, Kimberly
2018-01-19
A previous definition of adolescent asthma self-management was derived from interviews with clinicians/researchers and published literature; however, it did not incorporate perspectives of teens or parents. Therefore, we conducted in-depth interviews with teens and parents and synthesized present findings with the prior analysis to develop a more encompassing definition and model. Focal concepts were qualitatively extracted from 14-day self-management voice-diaries (n = 14) and 1-hour interviews (n = 42) with teens and parents (28 individuals) along with concepts found in the previous clinical/research oriented analysis. Conceptual structure and relationships were identified and key findings synthesized to develop a revised definition and model of adolescent asthma self-management. There were two primary self-management constructs: processes of self-management and tasks of self-management. Self-management was defined as the iterative process of assessing, deciding, and responding to specific situations in order to achieve personally important outcomes. Clinically relevant asthma self-management tasks included monitoring asthma, managing active issues through pharmacologic and non-pharmacologic strategies, preventing future issues, and communicating with others as needed. Self-management processes were reciprocally influenced by intrapersonal factors (both cognitive and physical), interpersonal factors (family, social and physical environments), and personally relevant asthma and non-asthma outcomes. This is the first definition of asthma self-management incorporating teen, parent, clinician, and researcher perspectives, which suggests that self-management processes and behaviors are influenced by individually variable personal and interpersonal factors, and are driven by personally important outcomes. Clinicians and researchers should investigate teens' symptom perceptions, medication beliefs, current approaches to symptom management, relevant outcomes, and personal priorities.
A design for a new catalog manager and associated file management for the Land Analysis System (LAS)
NASA Technical Reports Server (NTRS)
Greenhagen, Cheryl
1986-01-01
Due to the larger number of different types of files used in an image processing system, a mechanism for file management beyond the bounds of typical operating systems is necessary. The Transportable Applications Executive (TAE) Catalog Manager was written to meet this need. Land Analysis System (LAS) users at the EROS Data Center (EDC) encountered some problems in using the TAE catalog manager, including catalog corruption, networking difficulties, and lack of a reliable tape storage and retrieval capability. These problems, coupled with the complexity of the TAE catalog manager, led to the decision to design a new file management system for LAS, tailored to the needs of the EDC user community. This design effort, which addressed catalog management, label services, associated data management, and enhancements to LAS applications, is described. The new file management design will provide many benefits including improved system integration, increased flexibility, enhanced reliability, enhanced portability, improved performance, and improved maintainability.
Adaptive management for soil ecosystem services
Birge, Hannah E.; Bevans, Rebecca A.; Allen, Craig R.; Angeler, David G.; Baer, Sara G.; Wall, Diana H.
2016-01-01
Ecosystem services provided by soil include regulation of the atmosphere and climate, primary (including agricultural) production, waste processing, decomposition, nutrient conservation, water purification, erosion control, medical resources, pest control, and disease mitigation. The simultaneous production of these multiple services arises from complex interactions among diverse aboveground and belowground communities across multiple scales. When a system is mismanaged, non-linear and persistent losses in ecosystem services can arise. Adaptive management is an approach to management designed to reduce uncertainty as management proceeds. By developing alternative hypotheses, testing these hypotheses and adjusting management in response to outcomes, managers can probe dynamic mechanistic relationships among aboveground and belowground soil system components. In doing so, soil ecosystem services can be preserved and critical ecological thresholds avoided. Here, we present an adaptive management framework designed to reduce uncertainty surrounding the soil system, even when soil ecosystem services production is not the explicit management objective, so that managers can reach their management goals without undermining soil multifunctionality or contributing to an irreversible loss of soil ecosystem services.
Financial risk management of pharmacy benefits.
Saikami, D
1997-10-01
Financial risk management of pharmacy benefits in integrated health systems is explained. A managed care organization should assume financial risk for pharmacy benefits only if it can manage the risk. Horizontally integrated organizations often do not have much control over the management of drug utilization and costs. Vertically integrated organizations have the greatest ability to manage pharmacy financial risk; virtual integration may also be compatible. Contracts can be established in which the provider is incentivized or placed at partial or full risk. The main concerns that health plans have with respect to pharmacy capitation are formulary management and the question of who should receive rebates from manufacturers. The components needed to managed pharmacy financial risk depend on the type of contract negotiated. Health-system pharmacists are uniquely positioned to take advantage of opportunities opening up through pharmacy risk contracting. Functions most organizations must provide when assuming pharmacy financial risk can be divided into internal and external categories. Internally performed functions include formulary management, clinical pharmacy services and utilization management, and utilization reports for physicians. Functions that can be outsourced include claims processing and administration, provider- and customer support services, and rebates. Organizations that integrate the pharmacy benefit across the health care continuum will be more effective in controlling costs and improving outcomes than organizations that handle this benefit as separate from others. Patient care should not focus on payment mechanisms and unit costs but on developing superior processes and systems that improve health care.
Operation Windshield and the simplification of emergency management.
Andrews, Michael
2016-01-01
Large, complex, multi-stakeholder exercises are the culmination of years of gradual progression through a comprehensive training and exercise programme. Exercises intended to validate training, refine procedures and test processes initially tested in isolation are combined to ensure seamless response and coordination during actual crises. The challenges of integrating timely and accurate situational awareness from an array of sources, including response agencies, municipal departments, partner agencies and the public, on an ever-growing range of media platforms, increase information management complexity in emergencies. Considering that many municipal emergency operations centre roles are filled by staff whose day jobs have little to do with crisis management, there is a need to simplify emergency management and make it more intuitive. North Shore Emergency Management has accepted the challenge of making emergency management less onerous to occasional practitioners through a series of initiatives aimed to build competence and confidence by making processes easier to use as well as by introducing technical tools that can simplify processes and enhance efficiencies. These efforts culminated in the full-scale earthquake exercise, Operation Windshield, which preceded the 2015 Emergency Preparedness and Business Continuity Conference in Vancouver, British Columbia.
Clausen, Christina; Lavoie-Tremblay, Melanie; Purden, Margaret; Lamothe, Lise; Ezer, Héléne; McVey, Lynne
2017-09-01
The aim of this study was to describe the process of how nurse and physician managers in formalized dyads work together to address clinical management issues in the surgical division of one hospital setting. Nurse and physician managers are uniquely positioned to co-lead and transform healthcare delivery. However, little is known about how this management dyad functions in the healthcare setting. A constructivist grounded theory approach was used to investigate the process of how nurse and physician managers work together in formalized dyads in an urban Canadian university affiliated teaching hospital. Data collection occurred from September 2013-August 2014. Data included participant observation (n = 142 hours) and intensive interviews (n = 36) with nurse-physician manager dyads (12 nurses, 9 physicians) collected in a surgical department. Theoretical sampling was used to elaborate on properties of emerging concepts and categories. A substantive theory on 'intentional partnering' was generated. Nurses' and physicians' professional agendas, which included their interests and purposes for working with each other served as the starting point of 'intentional partnering'. The theory explains how nurse and physician managers align their professional agendas through the processes of 'accepting mutual necessity', 'daring to risk (together)' and 'constructing a shared responsibility'. Being credible, earning trust and safeguarding respect were fundamental to communicating effectively. Intentional partnering elucidates the relational components of working together and the strategizing that occurs as each partner deliberates on what he or she is willing to accept, risk and put into place to reap the benefits of collaborating. © 2017 John Wiley & Sons Ltd.
Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew
2017-01-01
An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research community. It is freely available under the GNU GPL v3 licence and can be accessed from, https://muccg.github.io/mastr-ms/.
Assessing the quality of cost management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fayne, V.; McAllister, A.; Weiner, S.B.
1995-12-31
Managing environmental programs can be effective only when good cost and cost-related management practices are developed and implemented. The Department of Energy`s Office of Environmental Management (EM), recognizing this key role of cost management, initiated several cost and cost-related management activities including the Cost Quality Management (CQM) Program. The CQM Program includes an assessment activity, Cost Quality Management Assessments (CQMAs), and a technical assistance effort to improve program/project cost effectiveness. CQMAs provide a tool for establishing a baseline of cost-management practices and for measuring improvement in those practices. The result of the CQMA program is an organization that has anmore » increasing cost-consciousness, improved cost-management skills and abilities, and a commitment to respond to the public`s concerns for both a safe environment and prudent budget outlays. The CQMA program is part of the foundation of quality management practices in DOE. The CQMA process has contributed to better cost and cost-related management practices by providing measurements and feedback; defining the components of a quality cost-management system; and helping sites develop/improve specific cost-management techniques and methods.« less
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
The Preparedness Web: Utilizing Regional Collaborative Networks for Homeland Security Preparedness
2007-09-01
Hughes’ conflict strategies could then be used to develop methodologies for improved conflict management . 45 D. ORGANIZATIONAL CHANGE Emergency...has training in place to develop collaborative skills (e.g., conflict management , team process skills). * 2.3 (0.7) * 4 point scale; 1...included (a) knowledge of other agencies’ capabilities, (b) communication, (c) inter-agency trust and respect, and (d) conflict management . Further
Burning for conservation values: should the goal be to mimic a natural fire regime?
Sharon M. Hermann; John S. Kush; John C. Gilbert; Rebecca J. Barlow
2015-01-01
Managers are often asked to include conservation values in forest management plans. In the upland coastal plain of the southeastern United States, fire is an important natural process and a vital land management tool. Many native ecosystems are dependent on frequent burns. It is often suggested that mimicking a natural fire regime is the best way to improve and...
An agent based architecture for high-risk neonate management at neonatal intensive care unit.
Malak, Jaleh Shoshtarian; Safdari, Reza; Zeraati, Hojjat; Nayeri, Fatemeh Sadat; Mohammadzadeh, Niloofar; Farajollah, Seide Sedighe Seied
2018-01-01
In recent years, the use of new tools and technologies has decreased the neonatal mortality rate. Despite the positive effect of using these technologies, the decisions are complex and uncertain in critical conditions when the neonate is preterm or has a low birth weight or malformations. There is a need to automate the high-risk neonate management process by creating real-time and more precise decision support tools. To create a collaborative and real-time environment to manage neonates with critical conditions at the NICU (Neonatal Intensive Care Unit) and to overcome high-risk neonate management weaknesses by applying a multi agent based analysis and design methodology as a new solution for NICU management. This study was a basic research for medical informatics method development that was carried out in 2017. The requirement analysis was done by reviewing articles on NICU Decision Support Systems. PubMed, Science Direct, and IEEE databases were searched. Only English articles published after 1990 were included; also, a needs assessment was done by reviewing the extracted features and current processes at the NICU environment where the research was conducted. We analyzed the requirements and identified the main system roles (agents) and interactions by a comparative study of existing NICU decision support systems. The Universal Multi Agent Platform (UMAP) was applied to implement a prototype of our multi agent based high-risk neonate management architecture. Local environment agents interacted inside a container and each container interacted with external resources, including other NICU systems and consultation centers. In the NICU container, the main identified agents were reception, monitoring, NICU registry, and outcome prediction, which interacted with human agents including nurses and physicians. Managing patients at the NICU units requires online data collection, real-time collaboration, and management of many components. Multi agent systems are applied as a well-known solution for management, coordination, modeling, and control of NICU processes. We are currently working on an outcome prediction module using artificial intelligence techniques for neonatal mortality risk prediction. The full implementation of the proposed architecture and evaluation is considered the future work.
Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1
NASA Technical Reports Server (NTRS)
Dodson, D. B.
1975-01-01
The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.
Building physician resilience.
Jensen, Phyllis Marie; Trollope-Kumar, Karen; Waters, Heather; Everson, Jennifer
2008-05-01
To explore the dimensions of family physician resilience. Qualitative study using in-depth interviews with family physician peers. Hamilton, Ont. Purposive sample of 17 family physicians. An iterative process of face-to-face, in-depth interviews that were audiotaped and transcribed. The research team independently reviewed each interview for emergent themes with consensus reached through discussion and comparison. Themes were grouped into conceptual categories. Four main aspects of physician resilience were identified: 1) attitudes and perspectives, which include valuing the physician role, maintaining interest, developing self-awareness, and accepting personal limitations; 2) balance and prioritization, which include setting limits, taking effective approaches to continuing professional development, and honouring the self;3) practice management style, which includes sound business management, having good staff, and using effective practice arrangements; and 4) supportive relations, which include positive personal relationships, effective professional relationships, and good communication. Resilience is a dynamic, evolving process of positive attitudes and effective strategies.
Unpaved road dust management, a successful practitioner’s handbook
Jones, David; Kociolek, Angela; Surdahl, Roger; Bolander, Peter; Drewes, Bruce; Duran, Matthew; Fay, Laura; Huntington, George; James, David; Milne, Clark; Nahra, Mark; Scott, Andrew; Vitale, Bob; Williams, Bethany
2013-01-01
This handbook provides broad programmatic aspects of unpaved road management. It is based on observations made during a national scan tour and provides useful and insightful excerpts of realworld examples and includes practical how-to instructions for determining what type of treatment may be needed for different situations. It ultimately strives to encourage road managers to think broadly about the process of unpaved road management rather than just focusing on a specific type of chemical treatment.
A randomized trial of an acid-peptic disease management program in a managed care environment.
Ofman, Joshua J; Segal, Richard; Russell, Wayne L; Cook, Deborah J; Sandhu, Meenu; Maue, Susan K; Lowenstein, Edward H; Pourfarzib, Ray; Blanchette, Erv; Ellrodt, Gray; Weingarten, Scott R
2003-06-01
To study the effectiveness of a disease management program for patients with acid-related disorders. A cluster-randomized clinical trial of 406 patients comparing a disease management program with "usual practice." Enrolled patients included those presenting with new dyspepsia and chronic users of antisecretory drugs in 8 geographically separate physician offices associated with the Orlando Health Care Group. There were 35 providers in the intervention group and 48 in the control group. The disease management program included evidence-based practice guidelines implemented by using physician champions, academic detailing, and multidisciplinary teams. Processes of care, patient symptoms, quality of life, costs, and work days lost were measured 6 months after patient enrollment. Compared with usual practice, disease management was associated with improvements in Helicobacter pylori testing (61% vs 9%; P = .001), use of recommended H pylori treatment regimens (96% vs 10%; P = .001), and discontinuation rates of proton pump therapy after treatment (70% vs 36%; P = .04). There were few differences in patient quality of life or symptoms between the 2 study groups. Disease management resulted in fewer days of antisecretory therapy (71.7 vs 88.1 days; P = .02) but no difference in total costs. This disease management program for patients with acid-related disorders led to improved processes of care. The effectiveness of such a program in other settings requires further study.
Benchmarking processes for managing large international space programs
NASA Technical Reports Server (NTRS)
Mandell, Humboldt C., Jr.; Duke, Michael B.
1993-01-01
The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.
NASA Technical Reports Server (NTRS)
Shipman, D. L.
1972-01-01
The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.
Frameworks for amending reservoir water management
Mower, Ethan; Miranda, Leandro E.
2013-01-01
Managing water storage and withdrawals in many reservoirs requires establishing seasonal targets for water levels (i.e., rule curves) that are influenced by regional precipitation and diverse water demands. Rule curves are established as an attempt to balance various water needs such as flood control, irrigation, and environmental benefits such as fish and wildlife management. The processes and challenges associated with amending rule curves to balance multiuse needs are complicated and mostly unfamiliar to non-US Army Corps of Engineers (USACE) natural resource managers and to the public. To inform natural resource managers and the public we describe the policies and process involved in amending rule curves in USACE reservoirs, including 3 frameworks: a general investigation, a continuing authority program, and the water control plan. Our review suggests that water management in reservoirs can be amended, but generally a multitude of constraints and competing demands must be addressed before such a change can be realized.
Study on HOPE Management Mode of Coal Enterprises Based on Systematic Thinking
NASA Astrophysics Data System (ADS)
Zhaoran, Zhang; Tianzhu, Zhang; Wenjing, Tong
2018-02-01
The extensive management mode of coal enterprises is no longer applicable to the demand of enterprise development under the new economic situation. Combined with the characteristics of coal mine production, based on the system of thinking, integration of lean, people, comprehensive, job management theory, formed HOPE management model, including a core system and three support systems and 18 elements. There are three stages in the development and implementation of this model. To 6S site management for the initial stage to job process reengineering for the intermediate stage to post value process control for the advanced stage. The successful implementation of HOPE model in coal enterprises needs comprehensive control from five aspects: lean culture construction, flattening organizational structure, cost control system, performance appraisal system and lean information management platform. HOPE model can be implemented smoothly and make “win-win” between enterprises and employees.
A fully integrated SWAT-MODFLOW hydrologic model
USDA-ARS?s Scientific Manuscript database
The Soil and Water Assessment Tool (SWAT) and MODFLOW models are being used worldwide for managing surface and groundwater water resources. The SWAT models hydrological processes occurring at the surface including shallow aquifers, while MODFLOW simulate groundwater processes. However, neither SWAT ...
RMP Guidance for Warehouses - Appendix D: OSHA Guidance on PSM
This text is taken directly from OSHA's appendix C to the Process Safety Management standard (29 CFR 1910.119). Compiled information required by this standard, including material safety data sheets (MSDS), is essential to process hazards analysis (PHA).
76 FR 20336 - Defense Audit Advisory Committee (DAAC)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... DEPARTMENT OF DEFENSE Office of the Secretary Defense Audit Advisory Committee (DAAC) AGENCY... following Federal advisory committee meeting of the Defense Audit Advisory Committee will be held. DATES... management to include financial reporting processes, systems of internal controls, audit processes, and...
77 FR 74834 - Office of the Secretary
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-18
... DEPARTMENT OF DEFENSE Office of the Secretary Defense Audit Advisory Committee (DAAC); Notice of... Defense announces the following Federal advisory committee meeting of the Defense Audit Advisory Committee... financial management to include financial reporting processes, systems of internal controls, audit processes...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-03-01
This report covers the H-Coal Pilot Plant facility located in Catlettsburg, Kentucky. The authorization for this project was under DOE contract No. DE-AC05-78ET11052, formally ET-78-C-01-3224. Badger Plants, Inc. carried out the construction management of this facility. The estimated total cost is $147,265,013. A brief process/technical description of the Pilot Plant covers subjects such as objectives, capacity, expected life, etc. A brief technical description of each processing unit, including its purpose in the overall operations of the plant is given. A general description of the organizational history of the project is given. Current overall organization and a description of the responsibilitiesmore » of each participant are included. Badger Plant's organization at manager level is shown.« less
Marshall Space Flight Center Ground Systems Development and Integration
NASA Technical Reports Server (NTRS)
Wade, Gina
2016-01-01
Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.
NASA Technical Reports Server (NTRS)
Watson, Andrew B.
1988-01-01
Two types of research issues are involved in image management systems with space station applications: image processing research and image perception research. The image processing issues are the traditional ones of digitizing, coding, compressing, storing, analyzing, and displaying, but with a new emphasis on the constraints imposed by the human perceiver. Two image coding algorithms have been developed that may increase the efficiency of image management systems (IMS). Image perception research involves a study of the theoretical and practical aspects of visual perception of electronically displayed images. Issues include how rapidly a user can search through a library of images, how to make this search more efficient, and how to present images in terms of resolution and split screens. Other issues include optimal interface to an IMS and how to code images in a way that is optimal for the human perceiver. A test-bed within which such issues can be addressed has been designed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
...NMFS approves Framework Adjustment 47 (Framework 47) to the Northeast (NE) Multispecies Fishery Management Plan (FMP) and implements the approved measures. The New England Fishery Management Council (Council) developed and adopted Framework 47 based on the biennial review process established in the NE Multispecies FMP to develop annual catch limits (ACLs) and revise management measures necessary to rebuild overfished groundfish stocks and achieve the goals and objectives of the FMP. This action also implements management measures and revises existing regulations that are not included in Framework 47, including common pool management measures for fishing year (FY) 2012, modification of the Ruhle trawl definition, and clarification of the regulations for charter/party and recreational groundfish vessels fishing in groundfish closed areas. This action is intended to prevent overfishing, rebuild overfished stocks, achieve optimum yield, and ensure that management measures are based on the best available scientific information at the time Framework 47 was submitted.
NASA Technical Reports Server (NTRS)
Beckham, W. S., Jr.; Keune, F. A.
1974-01-01
The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.
Microvax-based data management and reduction system for the regional planetary image facilities
NASA Technical Reports Server (NTRS)
Arvidson, R.; Guinness, E.; Slavney, S.; Weiss, B.
1987-01-01
Presented is a progress report for the Regional Planetary Image Facilities (RPIF) prototype image data management and reduction system being jointly implemented by Washington University and the USGS, Flagstaff. The system will consist of a MicroVAX with a high capacity (approx 300 megabyte) disk drive, a compact disk player, an image display buffer, a videodisk player, USGS image processing software, and SYSTEM 1032 - a commercial relational database management package. The USGS, Flagstaff, will transfer their image processing software including radiometric and geometric calibration routines, to the MicroVAX environment. Washington University will have primary responsibility for developing the database management aspects of the system and for integrating the various aspects into a working system.
NONMEMory: a run management tool for NONMEM.
Wilkins, Justin J
2005-06-01
NONMEM is an extremely powerful tool for nonlinear mixed-effect modelling and simulation of pharmacokinetic and pharmacodynamic data. However, it is a console-based application whose output does not lend itself to rapid interpretation or efficient management. NONMEMory has been created to be a comprehensive project manager for NONMEM, providing detailed summary, comparison and overview of the runs comprising a given project, including the display of output data, simple post-run processing, fast diagnostic plots and run output management, complementary to other available modelling aids. Analysis time ought not to be spent on trivial tasks, and NONMEMory's role is to eliminate these as far as possible by increasing the efficiency of the modelling process. NONMEMory is freely available from http://www.uct.ac.za/depts/pha/nonmemory.php.
Natural resources information system.
NASA Technical Reports Server (NTRS)
Leachtenauer, J. C.; Woll, A. M.
1972-01-01
A computer-based Natural Resources Information System was developed for the Bureaus of Indian Affairs and Land Management. The system stores, processes and displays data useful to the land manager in the decision making process. Emphasis is placed on the use of remote sensing as a data source. Data input consists of maps, imagery overlays, and on-site data. Maps and overlays are entered using a digitizer and stored as irregular polygons, lines and points. Processing functions include set intersection, union and difference and area, length and value computations. Data output consists of computer tabulations and overlays prepared on a drum plotter.
2016-11-15
During a ribbon cutting ceremony in the high bay of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, center director Bob Cabana, far left, is joined by Bill Dowdell, Kennedy's International Space Station technical director, Josephine Burnett, director of Exploration Research and Technology, Andy Allen, Jacobs vice president and general manager and Test and Operations Support Contract program manager, and Jeff McAlear, Jacobs director of Processing Services. The event celebrated completion of facility modifications to improve processing and free up zones tailored to a variety of needs supporting a robust assortment of space-bound hardware including NASA programs and commercial space companies.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... information that is used to assess inherent risks and internal control processes. Such activities include... management and information systems; and internal controls. The financial condition rating is supported by... appropriate standards of capitalization, liquidity, and risk management consistent with the principles of...
TQM in Rural Education: Managing Schools from a Business Perspective.
ERIC Educational Resources Information Center
Nelson, William
1994-01-01
Outlines the 14 points of Deming's business philosophy of Total Quality Management in terms of rural education, including adoption of a common mission, movement from mass inspection (standardized testing) to individualized assessment, constant system improvement, training for those involved in the process, improved communication, employee rewards…
Cyber-Evaluation: Evaluating a Distance Learning Program.
ERIC Educational Resources Information Center
Henderson, Denise L.
This paper examines how the process of soliciting evaluation feedback from nonresident students in the Army Management Staff College (Virginia) program on leadership and management for civilian employees of the Army has evolved since 1995. Course design is briefly described, including the use of video-teleconferences, chat rooms, an electronic…
Leading People, Managing Processes: School Business Administrators in the 21st Century.
ERIC Educational Resources Information Center
DiBella, Cecilia M.
1999-01-01
School business administrators must be both business managers and educators. As the school district's chief financial officer, the school business administrator must have strong communication and interpersonal skills. Spheres of involvement include working with school staff, parents, the district office, town officials and committees, vendors, and…
Managing Technological Change in Libraries and Information Services.
ERIC Educational Resources Information Center
Klobas, Jane E.
1990-01-01
Examines factors to be considered in the management of technological change in libraries and information services. The organizational climate for change is discussed, and factors to consider when developing a strategy for introducing a new product, service, or system are described, including leadership, goals, political processes, marketing, and…
The Impact of In-Prison Therapeutic Community Programs on Prison Management.
ERIC Educational Resources Information Center
Prendergast, Michael; Farabee, David; Cartier, Jerome
2001-01-01
Presents findings of a process evaluation of the California Substance Abuse Treatment Facility. Measures from the evaluation suggest that the presence of a therapeutic community within a prison is associated with significant advantages for management of the institution-including lower rates of infractions, reduced absenteeism among correctional…
Proceedings-1979 third annual practical conference on communication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-04-01
Topics covered at the meeting include: nonacademic writing, writer and editor training in technical publications, readability of technical documents, guide for beginning technical editors, a visual aids data base, newsletter publishing, style guide for a project management organization, word processing, computer graphics, text management for technical documentation, and typographical terminology.
Optical Disc Technology for Information Management.
ERIC Educational Resources Information Center
Brumm, Eugenia K.
1991-01-01
This summary of the literature on document image processing from 1988-90 focuses on WORM (write once read many) technology and on rewritable (i.e., erasable) optical discs, and excludes CD-ROM. Highlights include vendors and products, standards, comparisons of storage media, software, legal issues, records management, indexing, and computer…
The Changing Business Environment: Implications for Vocational Curricula. State-of-the-Art Paper.
ERIC Educational Resources Information Center
Smith, E. Ray; Stallard, John J.
The widespread use of the micro/personal computer and related technological advancements are having important impacts on information management in the modern electronic office. Some of the most common software applications include word processing, spread sheet analysis, data management, graphics, and communications. Ancillary hardware/software…
Collective Decision Making in Organizations.
ERIC Educational Resources Information Center
Svenning, Lynne L.
Based on the assumption that educators can adopt new patterns of organization and management to improve the quality of decision and change in education, this paper attempts to make decision theory and small group process theory relevant to practical decision situations confronting educational managers. Included are (1) a discussion of the…
Do You Have a Crisis Management Plan?
ERIC Educational Resources Information Center
Pleviak, Walter; Milkevitch, Frank
2001-01-01
Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)
5 CFR 1320.9 - Agency certifications for proposed collections of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Agency certifications for proposed collections of information. 1320.9 Section 1320.9 Administrative Personnel OFFICE OF MANAGEMENT AND BUDGET OMB... efficient and effective management and use of the information to be collected, including the processing of...
Development of cropland management dataset to support U.S. SWAT assessments
USDA-ARS?s Scientific Manuscript database
The Soil and Water Assessment Tool (SWAT) is a widely used hydrologic/water quality simulation model in the U.S. Process-based models like SWAT require a great deal of data to accurately represent the natural world, including topography, landuse, soils, weather, and management. With the exception ...
Foglia, Mary Beth; Pearlman, Robert A; Bottrell, Melissa M; Altemose, Jane A; Fox, Ellen
2008-01-01
Setting priorities and the subsequent allocation of resources is a major ethical issue facing healthcare facilities, including the Veterans Health Administration (VHA), the largest integrated healthcare delivery network in the United States. Yet despite the importance of priority setting and its impact on those who receive and those who provide care, we know relatively little about how clinicians and managers view allocation processes within their facilities. The purpose of this secondary analysis of survey data was to characterize staff members' perceptions regarding the fairness of healthcare ethics practices related to resource allocation in Veterans Administration (VA) facilities. The specific aim of the study was to compare the responses of clinicians, clinician managers, and non-clinician managers with respect to these survey items. We utilized a paper and web-based survey and a cross-sectional design of VHA clinicians and managers. Our sample consisted of a purposive stratified sample of 109 managers and a stratified random sample of 269 clinicians employed 20 or more hours per week in one of four VA medical centers. The four medical centers were participating as field sites selected to test the logistics of administering and reporting results of the Integrated Ethics Staff Survey, an assessment tool aimed at characterizing a broad range of ethical practices within a healthcare organization. In general, clinicians were more critical than clinician managers or non-clinician managers of the institutions' allocation processes and of the impact of resource decisions on patient care. Clinicians commonly reported that they did not (a) understand their facility's decision-making processes, (b) receive explanations from management regarding the reasons behind important allocation decisions, or (b) perceive that they were influential in allocation decisions. In addition, clinicians and managers both perceived that education related to the ethics of resource allocation was insufficient and that their facilities could increase their effectiveness in identifying and resolving ethical problems related to resource allocation. How well a healthcare facility ensures fairness in the way it allocates its resources across programs and services depends on multiple factors, including awareness by decision makers that setting priorities and allocating resources is a moral enterprise (moral awareness), the availability of a consistent process that includes important stakeholder groups (procedural justice), and concurrence by stakeholders that decisions represent outcomes that fairly balance competing interests and have a positive net effect on the quality of care (distributive justice). In this study, clinicians and managers alike identified the need for improvement in healthcare ethics practices related to resource allocation.
Wise, Meg; Gustafson, David H.; Sorkness, Christine A.; Molfenter, Todd; Staresinic, Anthony; Meis, Tracy; Hawkins, Robert P.; Shanovich, Kathleen Kelly; Walker, Nola P.
2008-01-01
This article reports on the development of a personalized, Web-based asthma-education program for parents whose 4- to 12-year-old children have moderate to severe asthma. Personalization includes computer-based tailored messages and a human coach to build asthma self-management skills. Computerized features include the Asthma Manager, My Calendar/Reminder, My Goals, and a tailored home page. These are integrated with monthly asthma-education phone calls from an asthmanurse case manager. The authors discuss the development process and issues and describe the current randomized evaluation study to test whether the yearlong integrated intervention can improve adherence to a daily asthma controller medication, asthma control, and parent quality of life to reduce asthma-related healthcare utilization. Implications for health education for chronic disease management are raised. PMID:16928987
[Selected aspects of computer-assisted literature management].
Reiss, M; Reiss, G
1998-01-01
We want to report about our own experiences with a database manager. Bibliography database managers are used to manage information resources: specifically, to maintain a database to references and create bibliographies and reference lists for written works. A database manager allows to enter summary information (record) for articles, book sections, books, dissertations, conference proceedings, and so on. Other features that may be included in a database manager include the ability to import references from different sources, such as MEDLINE. The word processing components allow to generate reference list and bibliographies in a variety of different styles, generates a reference list from a word processor manuscript. The function and the use of the software package EndNote 2 for Windows are described. Its advantages in fulfilling different requirements for the citation style and the sort order of reference lists are emphasized.
FORUM: Effective management of ecological resilience – are we there yet?
Spears, Bryan M.; Ives, Stephen C.; Angeler, David G.; Allen, Craig R.; Birk, Sebastian; Carvalho, Laurence; Cavers, Stephen; Daunt, Francis; Morton, R. Daniel; Pocock, Michael J. O.; Rhodes, Glenn; Thackeray, Stephen J.
2015-01-01
Ecological resilience is developing into a credible paradigm for policy development and environmental management for preserving natural capital in a rapidly changing world. However, resilience emerges from complex interactions, limiting the translation of theory into practice.Main limitations include the following: (i) difficulty in quantification and detection of changes in ecological resilience, (ii) a lack of empirical evidence to support preventative or proactive management and (iii) difficulties in managing processes operating across socio-ecological systems that vary in space and time.We highlight recent research with the potential to address these limitations including new and/or improved indicators of resilience and tools to assess scale as a driver of resilience.Synthesis and applications. Effective resilience-based management must be adaptive in nature. To support this, we propose an operational model using resilience-based iterative management actions operating across scales.
NASA Astrophysics Data System (ADS)
McNeil, Ronald D.; Miele, Renato; Shaul, Dennis
2000-10-01
Information technology is driving improvements in manufacturing systems. Results are higher productivity and quality. However, corporate strategy is driven by a number of factors and includes data and pressure from multiple stakeholders, which includes employees, managers, executives, stockholders, boards, suppliers and customers. It is also driven by information about competitors and emerging technology. Much information is based on processing of data and the resulting biases of the processors. Thus, stakeholders can base inputs on faulty perceptions, which are not reality based. Prior to processing, data used may be inaccurate. Sources of data and information may include demographic reports, statistical analyses, intelligence reports (e.g., marketing data), technology and primary data collection. The reliability and validity of data as well as the management of sources and information is critical element to strategy formulation. The paper explores data collection, processing and analyses from secondary and primary sources, information generation and report presentation for strategy formulation and contrast this with data and information utilized to drive internal process such as manufacturing. The hypothesis is that internal process, such as manufacturing, are subordinate to corporate strategies. The impact of possible divergence in quality of decisions at the corporate level on IT driven, quality-manufacturing processes based on measurable outcomes is significant. Recommendations for IT improvements at the corporate strategy level are given.
Improving the medical records department processes by lean management
Ajami, Sima; Ketabi, Saeedeh; Sadeghian, Akram; Saghaeinnejad-Isfahani, Sakine
2015-01-01
Background: Lean management is a process improvement technique to identify waste actions and processes to eliminate them. The benefits of Lean for healthcare organizations are that first, the quality of the outcomes in terms of mistakes and errors improves. The second is that the amount of time taken through the whole process significantly improves. Aims: The purpose of this paper is to improve the Medical Records Department (MRD) processes at Ayatolah-Kashani Hospital in Isfahan, Iran by utilizing Lean management. Materials and Methods: This research was applied and an interventional study. The data have been collected by brainstorming, observation, interview, and workflow review. The study population included MRD staff and other expert staff within the hospital who were stakeholders and users of the MRD. Statistical Analysis Used: The MRD were initially taught the concepts of Lean management and then formed into the MRD Lean team. The team then identified and reviewed the current processes subsequently; they identified wastes and values, and proposed solutions. Results: The findings showed that the MRD units (Archive, Coding, Statistics, and Admission) had 17 current processes, 28 wastes, and 11 values were identified. In addition, they offered 27 comments for eliminating the wastes. Conclusion: The MRD is the critical department for the hospital information system and, therefore, the continuous improvement of its services and processes, through scientific methods such as Lean management, are essential. Originality/Value: The study represents one of the few attempts trying to eliminate wastes in the MRD. PMID:26097862
Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success
NASA Astrophysics Data System (ADS)
Perera, Jeevan; Holsomback, Jerry D.
2005-12-01
Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.
Applying Data Mining Principles to Library Data Collection.
ERIC Educational Resources Information Center
Guenther, Kim
2000-01-01
Explains how libraries can use data mining techniques for more effective data collection. Highlights include three phases: data selection and acquisition; data preparation and processing, including a discussion of the use of XML (extensible markup language); and data interpretation and integration, including database management systems. (LRW)
2014-01-01
Background The aim of the study was to design and implementation of integrated solid wastes management pattern in Shahroud industrial zone, evaluates the results and determine possible performance problems. This cross - sectional study was carried out for 4 years in Shahroud industrial zone and the implementation process included:1- Qualitative and quantitative analysis of all solid waste generated in the city, 2- determine the current state of solid waste management in the zone and to identify programs conducted, 3- Design and implementation of integrated solid wastes management pattern including design and implementation of training programs, laws, penalties and incentives and explain and implement programs for all factories and 4- The monitoring of the implementation process and determine the results. Results Annually, 1,728 tons of solid wastes generated in the town including 1603 tons of industrial wastes and 125 tons of municipal wastes. By implementing this pattern, the two separated systems of collection and recycling of domestic and industrial wastes was launched in this zone. Also consistent with the goals, the amount of solid wastes generated and disposed in 2009 was 51.5 and 28.6 kg per 100 million Rials production, respectively. Conclusion Results showed that implementation of pattern of separated collection, training programs, capacity building, providing technical services, completing chain of industries and strengthening the cooperation between industrial estate management and industrial units could greatly reduce the waste management problems. PMID:24423020
NASA Astrophysics Data System (ADS)
James, C. Andrew; Kershner, Jessi; Samhouri, Jameal; O'Neill, Sandra; Levin, Phillip S.
2012-03-01
Ecosystem-based Management (EBM) is an approach that includes different management priorities and requires a balance between anthropogenic and ecological resource demands. Indicators can be used to monitor ecosystem status and trends, and assess whether projects and/or programs are leading to the achievement of management goals. As such, the careful selection of a suite of indicators is a crucial exercise. In this paper we describe an indicator evaluation and selection process designed to support the EBM approach in Puget Sound. The first step in this process was the development of a general framework for selecting indicators. The framework, designed to transparently include both scientific and policy considerations into the selection and evaluation process, was developed and then utilized in the organization and determination of a preliminary set of indicators. Next, the indicators were assessed against a set of nineteen distinct criteria that describe the model characteristics of an indicator. A literature review was performed for each indicator to determine the extent to which it satisfied each of the evaluation criteria. The result of each literature review was summarized in a numerical matrix, allowing comparison, and demonstrating the extent of scientific reliability. Finally, an approach for ranking indicators was developed to explore the effects of intended purpose on indicator selection. We identified several sets of scientifically valid and policy-relevant indicators that included metrics such as annual-7 day low flow and water system reliability, which are supportive of the EBM approach in the Puget Sound.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
... performing the technical analysis, management assessment, and program evaluation tasks required to address... premarket reviews that meet regulatory review standards. 2. Analysis of elements of the review process... process. This includes analysis of root causes for inefficiencies that may affect review performance and...
Ceramics in nuclear waste management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chikalla, T D; Mendel, J E
1979-05-01
Seventy-three papers are included, arranged under the following section headings: national programs for the disposal of radioactive wastes, waste from stability and characterization, glass processing, ceramic processing, ceramic and glass processing, leaching of waste materials, properties of nuclear waste forms, and immobilization of special radioactive wastes. Separate abstracts were prepared for all the papers. (DLC)
The need for spatially explicit quantification of benefits in invasive-species management.
Januchowski-Hartley, Stephanie R; Adams, Vanessa M; Hermoso, Virgilio
2018-04-01
Worldwide, invasive species are a leading driver of environmental change across terrestrial, marine, and freshwater environments and cost billions of dollars annually in ecological damages and economic losses. Resources limit invasive-species control, and planning processes are needed to identify cost-effective solutions. Thus, studies are increasingly considering spatially variable natural and socioeconomic assets (e.g., species persistence, recreational fishing) when planning the allocation of actions for invasive-species management. There is a need to improve understanding of how such assets are considered in invasive-species management. We reviewed over 1600 studies focused on management of invasive species, including flora and fauna. Eighty-four of these studies were included in our final analysis because they focused on the prioritization of actions for invasive species management. Forty-five percent (n = 38) of these studies were based on spatial optimization methods, and 35% (n = 13) accounted for spatially variable assets. Across all 84 optimization studies considered, 27% (n = 23) explicitly accounted for spatially variable assets. Based on our findings, we further explored the potential costs and benefits to invasive species management when spatially variable assets are explicitly considered or not. To include spatially variable assets in decision-making processes that guide invasive-species management there is a need to quantify environmental responses to invasive species and to enhance understanding of potential impacts of invasive species on different natural or socioeconomic assets. We suggest these gaps could be filled by systematic reviews, quantifying invasive species impacts on native species at different periods, and broadening sources and enhancing sharing of knowledge. © 2017 Society for Conservation Biology.
Managers and the new definition of quality.
Chilgren, Allison A
2008-01-01
The manager, particularly the mid-level manager, has a vital role in the success of any healthcare organization, especially in the realm of patient perception of quality. To patients, "quality" means how well a service was delivered, not how technically superior the actual service or clinical component turned out. This definition of quality can also be referred to as patient satisfaction. Managers, with help of an integrative team, can develop quality processes geared toward patient expectations by doing a number of things, including the following: clearly identify outcomes, and empower employees to achieve those goals; form an integrated quality development team to establish quality metrics; build in cultural competence into quality processes; and align the organization's mission to the overall quality program. With a successful quality program, managers can expect a considerable return on investment, satisfied patients and staff, and improved clinical outcomes.
Los Alamos Plutonium Facility Waste Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, K.; Montoya, A.; Wieneke, R.
1997-02-01
This paper describes the new computer-based transuranic (TRU) Waste Management System (WMS) being implemented at the Plutonium Facility at Los Alamos National Laboratory (LANL). The Waste Management System is a distributed computer processing system stored in a Sybase database and accessed by a graphical user interface (GUI) written in Omnis7. It resides on the local area network at the Plutonium Facility and is accessible by authorized TRU waste originators, count room personnel, radiation protection technicians (RPTs), quality assurance personnel, and waste management personnel for data input and verification. Future goals include bringing outside groups like the LANL Waste Management Facilitymore » on-line to participate in this streamlined system. The WMS is changing the TRU paper trail into a computer trail, saving time and eliminating errors and inconsistencies in the process.« less
Al Shemeili, Saeed; Klein, Susan; Strath, Alison; Fares, Saleh; Stewart, Derek
2016-10-01
The structures and processes around the management of medicines for elderly, hospitalized patients are ill defined. This study aimed to determine consensus related to strategic and operational approaches in the United Arab Emirates. A modified Delphi technique, consensus study with first round statements developed from systematic reviews related to medicines management. Normalization process theory and the theoretical domains framework were applied in the construction of statements, organized into key elements of medicines management: guidelines for medicines management, medicines reconciliation, medicines selection, prescribing and review, medicines adherence, medicines counselling, health professional training and evaluation research. Seventy per cent (summative agree and strongly agree) was set as the target for consensus. Thirty panellists were recruited, representing senior physicians working within geriatrics, hospital pharmacy and nursing directors, chief health professionals (including social workers) and policy makers within the Health Authority of Abu Dhabi and academics. A high level of consensus was obtained for most statements relating to the structures and processes of medicines management. While consensus was not achieved for targeting only those patients with medicines related issues, it was achieved for focusing on all elderly admissions. Similarly, consensus was not achieved for which professions were most suited to roles but was achieved for trained and competent staff. High levels of consensus were obtained for structures and processes of medicines management relating to elderly hospitalized patients. Trained and competent health professionals were preferred to specific professions for any tasks and that all elderly patients and not targeted patients should be the focus for medicines management. © 2016 John Wiley & Sons, Ltd.
A Recipe for Streamlining Mission Management
NASA Technical Reports Server (NTRS)
Mitchell, Andrew E.; Semancik, Susan K.
2004-01-01
This paper describes a project's design and implementation for streamlining mission management with knowledge capture processes across multiple organizations of a NASA directorate. Thc project's focus is on standardizing processes and reports; enabling secure information access and case of maintenance; automating and tracking appropriate workflow rules through process mapping; and infusing new technologies. This paper will describe a small team's experiences using XML technologies through an enhanced vendor suite of applications integrated on Windows-based platforms called the Wallops Integrated Scheduling and Document Management System (WISDMS). This paper describes our results using this system in a variety of endeavors, including providing range project scheduling and resource management for a Range and Mission Management Office; implementing an automated Customer Feedback system for a directorate; streamlining mission status reporting across a directorate; and initiating a document management, configuration management and portal access system for a Range Safety Office's programs. The end result is a reduction of the knowledge gap through better integration and distribution of information, improved process performance, automated metric gathering, and quicker identification of problem areas and issues. However, the real proof of the pudding comes through overcoming the user's reluctance to replace familiar, seasoned processes with new technology ingredients blended with automated procedures in an untested recipe. This paper shares some of the team's observations that led to better implementation techniques, as well as an IS0 9001 Best Practices citation. This project has provided a unique opportunity to advance NASA's competency in new technologies, as well as to strategically implement them within an organizational structure, while wetting the appetite for continued improvements in mission management.
1992-12-01
rights or on management issues such as personnel and infrastructure investments are addresseud in the directive only at the broadest level, or in many...area with investments , including information systems. c. Functional processes improvements shall be accomplished though activity modeling and busi ass...an enterprise has invested considerable time, money and effort into the current system and has limited funds to upgrade the system (111:37). Software
Charting the Course: Life Cycle Management of Mars Mission Digital Information
NASA Technical Reports Server (NTRS)
Reiz, Julie M.
2003-01-01
This viewgraph presentation reviews the life cycle management of MER Project information. This process was an essential key to the successful launch of the MER Project rovers. Incorporating digital information archive requirements early in the project life cycle resulted in: Design of an information system that included archive metadata, Reduced the risk of information loss through in-process appraisal, Easier transfer of project information to institutional online archive and Project appreciation for preserving information for reuse by future projects
Electric power processing, distribution, management and energy storage
NASA Astrophysics Data System (ADS)
Giudici, R. J.
1980-07-01
Power distribution subsystems are required for three elements of the SPS program: (1) orbiting satellite, (2) ground rectenna, and (3) Electric Orbiting Transfer Vehicle (EOTV). Power distribution subsystems receive electrical power from the energy conversion subsystem and provide the power busses rotary power transfer devices, switchgear, power processing, energy storage, and power management required to deliver control, high voltage plasma interactions, electric thruster interactions, and spacecraft charging of the SPS and the EOTV are also included as part of the power distribution subsystem design.
Electric power processing, distribution, management and energy storage
NASA Technical Reports Server (NTRS)
Giudici, R. J.
1980-01-01
Power distribution subsystems are required for three elements of the SPS program: (1) orbiting satellite, (2) ground rectenna, and (3) Electric Orbiting Transfer Vehicle (EOTV). Power distribution subsystems receive electrical power from the energy conversion subsystem and provide the power busses rotary power transfer devices, switchgear, power processing, energy storage, and power management required to deliver control, high voltage plasma interactions, electric thruster interactions, and spacecraft charging of the SPS and the EOTV are also included as part of the power distribution subsystem design.
Erickson, Steven R; Salgado, Teresa M; Tan, Xi
2016-12-01
People who have intellectual and developmental disabilities (IDD) often rely on caregivers to assist in the medication management process. The aim of this study was to learn from caregivers, who are either family or support staff, what major issues arise throughout the process of managing medication and how these might be addressed. Problems identified by caregivers include (a) prescribers understanding of insurance and agency policies regarding medication utilization; (b) lack of continuity of care and accuracy of the medication record as well as clinical records; (c) poor communication among patients, caregivers, and clinicians; (d) patient willingness to take medication; (e) caregiver understanding and training of medication-related topics; and (f) the health system being unprepared to work with people who have IDD.
Draper, Andrew
2011-04-01
Results of Medicare's ACE demonstration project and Geisinger Health System's ProvenCare initiative provide insight into the challenges hospitals will face as bundled payment proliferates. An early analysis of these results suggests that hospitals would benefit from bringing full automation using clinical IT tools to bear in their efforts to meet these challenges. Other important factors contributing to success include board and physician leadership, organizational structure, pricing methodology for bidding, evidence-based medical practice guidelines, supply cost management, process efficiency management, proactive and aggressive case management, business development and marketing strategy, and the financial management system.
Dermatology practice management assures practice development and efficiency.
Wagener, D L
2000-09-01
This article provides an overview of the disciplines involved in managing a dermatology practice today. Several key management processes, including strategic planning, financial analysis, advertising and public relations, information systems management, and compliance program development and monitoring are addressed. This article explores several possible tactics that can be used to help guide your practice in the right direction without overtaxing your resources. Also offered are possible solutions for creating an organization that is poised for success, and a management team capable of steering the practice through the sea of change ahead.
Fifth anniversary of the first element of the International Spac
2003-12-03
Members of the media (at left) were invited to commemorate the fifth anniversary of the launch of the first element of the International Space Station by touring the Space Station Processing Facility (SSPF) at KSC. Giving an overview of Space Station processing are, at right, David Bethay (white shirt), Boeing/ISS Florida Operations; Charlie Precourt, deputy manager of the International Space Station Program; and Tip Talone, director of Space Station and Payload Processing at KSC. Reporters also had the opportunity to see Space Station hardware that is being processed for deployment once the Space Shuttles return to flight. The facility tour also included an opportunity for reporters to talk with NASA and Boeing mission managers about the various hardware elements currently being processed for flight.
Fifth anniversary of the first element of the International Spac
2003-12-03
Members of the media (at right) were invited to commemorate the fifth anniversary of the launch of the International Space Station by touring the Space Station Processing Facility (SSPF) at KSC. Giving an overview of Space Station processing are, at left, David Bethay (white shirt), Boeing/ISS Florida Operations; Charlie Precourt, deputy manager of the International Space Station Program; and Tip Talone, director of Space Station and Payload Processing at KSC. Reporters also had the opportunity to see Space Station hardware that is being processed for deployment once the Space Shuttles return to flight. The facility tour also included an opportunity for reporters to talk with NASA and Boeing mission managers about the various hardware elements currently being processed for flight.
Intelligent Work Process Engineering System
NASA Technical Reports Server (NTRS)
Williams, Kent E.
2003-01-01
Optimizing performance on work activities and processes requires metrics of performance for management to monitor and analyze in order to support further improvements in efficiency, effectiveness, safety, reliability and cost. Information systems are therefore required to assist management in making timely, informed decisions regarding these work processes and activities. Currently information systems regarding Space Shuttle maintenance and servicing do not exist to make such timely decisions. The work to be presented details a system which incorporates various automated and intelligent processes and analysis tools to capture organize and analyze work process related data, to make the necessary decisions to meet KSC organizational goals. The advantages and disadvantages of design alternatives to the development of such a system will be discussed including technologies, which would need to bedesigned, prototyped and evaluated.
NASA Technical Reports Server (NTRS)
Carnahan, Richard S., Jr.; Corey, Stephen M.; Snow, John B.
1989-01-01
Applications of rapid prototyping and Artificial Intelligence techniques to problems associated with Space Station-era information management systems are described. In particular, the work is centered on issues related to: (1) intelligent man-machine interfaces applied to scientific data user support, and (2) the requirement that intelligent information management systems (IIMS) be able to efficiently process metadata updates concerning types of data handled. The advanced IIMS represents functional capabilities driven almost entirely by the needs of potential users. Space Station-era scientific data projected to be generated is likely to be significantly greater than data currently processed and analyzed. Information about scientific data must be presented clearly, concisely, and with support features to allow users at all levels of expertise efficient and cost-effective data access. Additionally, mechanisms for allowing more efficient IIMS metadata update processes must be addressed. The work reported covers the following IIMS design aspects: IIMS data and metadata modeling, including the automatic updating of IIMS-contained metadata, IIMS user-system interface considerations, including significant problems associated with remote access, user profiles, and on-line tutorial capabilities, and development of an IIMS query and browse facility, including the capability to deal with spatial information. A working prototype has been developed and is being enhanced.
[Business organization theory: its potential use in the organization of the operating room].
Bartz, H-J
2005-07-01
The paradigm of patient care in the German health system is changing. The introduction of German Diagnosis Related Groups (G-DRGs), a diagnosis-related coding system, has made process-oriented thinking increasingly important. The treatment process is viewed and managed as a whole from the admission to the discharge of the patient. The interfaces of departments and sectors are diminished. A main objective of these measures is to render patient care more cost efficient. Within the hospital, the operating room (OR) is the most expensive factor accounting for 25 - 50 % of the costs of a surgical patient and is also a bottleneck in the surgical patient care. Therefore, controlling of the perioperative treatment process is getting more and more important. Here, the business organisation theory can be a very useful tool. Especially the concepts of process organisation and process management can be applied to hospitals. Process-oriented thinking uncovers and solves typical organisational problems. Competences, responsibilities and tasks are reorganised by process orientation and the enterprise is gradually transformed to a process-oriented system. Process management includes objective-oriented controlling of the value chain of an enterprise with regard to quality, time, costs and customer satisfaction. The quality of the process is continuously improved using process-management techniques. The main advantage of process management is consistent customer orientation. Customer orientation means to be aware of the customer's needs at any time during the daily routine. The performance is therefore always directed towards current market requirements. This paper presents the basics of business organisation theory and to point out its potential use in the organisation of the OR.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
Managing the construction bidding process : a move to simpler construction plan sets
DOT National Transportation Integrated Search
2001-01-31
This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...
Design for waste-management system
NASA Technical Reports Server (NTRS)
Guarneri, C. A.; Reed, A.; Renman, R.
1973-01-01
Study was made and system defined for water-recovery and solid-waste processing for low-rise apartment complexes. System can be modified to conform with unique requirements of community, including hydrology, geology, and climate. Reclamation is accomplished by treatment process that features reverse-osmosis membranes.
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2011 CFR
2011-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2012 CFR
2012-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2014 CFR
2014-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
10 CFR 70.72 - Facility changes and change process.
Code of Federal Regulations, 2013 CFR
2013-01-01
... management system to evaluate, implement, and track each change to the site, structures, processes, systems, equipment, components, computer programs, and activities of personnel. This system must be documented in... licensed material; (3) Modifications to existing operating procedures including any necessary training or...
77 FR 6122 - Providing Refurbishment Services to Federal Agencies
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... equipment? 5. Describe the process for disposing and recycling of failed equipment. Have all facilities in your recycling and disposal process been certified to safely recycle and manage electronics? If so... firms offering refurbishment services, including those developed specifically for recycling facilities...
Requirements Management for Net-Centric Enterprises. Phase 1
2011-04-28
These include Business Process Modeling Notation ( BPMN ) (White and Miers 2008) and Business Process Execution Language (BPEL) (Sarang, Juric et al...UML: Modeling, Analysis, Design, Morgan Kaufmann/The OMG Press. White, S. A. and D. Miers (2008). BPMN Modeling and Reference Guide, Future
NASA Astrophysics Data System (ADS)
Strotov, Valery V.; Taganov, Alexander I.; Konkin, Yuriy V.; Kolesenkov, Aleksandr N.
2017-10-01
Task of processing and analysis of obtained Earth remote sensing data on ultra-small spacecraft board is actual taking into consideration significant expenditures of energy for data transfer and low productivity of computers. Thereby, there is an issue of effective and reliable storage of the general information flow obtained from onboard systems of information collection, including Earth remote sensing data, into a specialized data base. The paper has considered peculiarities of database management system operation with the multilevel memory structure. For storage of data in data base the format has been developed that describes a data base physical structure which contains required parameters for information loading. Such structure allows reducing a memory size occupied by data base because it is not necessary to store values of keys separately. The paper has shown architecture of the relational database management system oriented into embedment into the onboard ultra-small spacecraft software. Data base for storage of different information, including Earth remote sensing data, can be developed by means of such database management system for its following processing. Suggested database management system architecture has low requirements to power of the computer systems and memory resources on the ultra-small spacecraft board. Data integrity is ensured under input and change of the structured information.
Grošelj, Petra; Zadnik Stirn, Lidija
2015-09-15
Environmental management problems can be dealt with by combining participatory methods, which make it possible to include various stakeholders in a decision-making process, and multi-criteria methods, which offer a formal model for structuring and solving a problem. This paper proposes a three-phase decision making approach based on the analytic network process and SWOT (strengths, weaknesses, opportunities and threats) analysis. The approach enables inclusion of various stakeholders or groups of stakeholders in particular stages of decision making. The structure of the proposed approach is composed of a network consisting of an objective cluster, a cluster of strategic goals, a cluster of SWOT factors and a cluster of alternatives. The application of the suggested approach is applied to a management problem of Pohorje, a mountainous area in Slovenia. Stakeholders from sectors that are important for Pohorje (forestry, agriculture, tourism and nature protection agencies) who can offer a wide range of expert knowledge were included in the decision-making process. The results identify the alternative of "sustainable development" as the most appropriate for development of Pohorje. The application in the paper offers an example of employing the new approach to an environmental management problem. This can also be applied to decision-making problems in various other fields. Copyright © 2015 Elsevier Ltd. All rights reserved.
Fifth anniversary of the first element of the International Spac
2003-12-03
In the Space Station Processing Facility, (from left) David Bethay, Boeing/ISS Florida Operations; Charlie Precourt, deputy manager of the International Space Station Program; and Tip Talone, director of Space Station and Payload Processing, give an overview of Space Station processing for the media. Members of the media were invited to commemorate the fifth anniversary of the launch of the first element of the International Space Station by touring the Space Station Processing Facility (SSPF) at KSC. Reporters also had the opportunity to see Space Station hardware that is being processed for deployment once the Space Shuttles return to flight. The facility tour also included an opportunity for reporters to talk with NASA and Boeing mission managers about the various hardware elements currently being processed for flight.
Land management: data availability and process understanding for global change studies.
Erb, Karl-Heinz; Luyssaert, Sebastiaan; Meyfroidt, Patrick; Pongratz, Julia; Don, Axel; Kloster, Silvia; Kuemmerle, Tobias; Fetzel, Tamara; Fuchs, Richard; Herold, Martin; Haberl, Helmut; Jones, Chris D; Marín-Spiotta, Erika; McCallum, Ian; Robertson, Eddy; Seufert, Verena; Fritz, Steffen; Valade, Aude; Wiltshire, Andrew; Dolman, Albertus J
2017-02-01
In the light of daunting global sustainability challenges such as climate change, biodiversity loss and food security, improving our understanding of the complex dynamics of the Earth system is crucial. However, large knowledge gaps related to the effects of land management persist, in particular those human-induced changes in terrestrial ecosystems that do not result in land-cover conversions. Here, we review the current state of knowledge of ten common land management activities for their biogeochemical and biophysical impacts, the level of process understanding and data availability. Our review shows that ca. one-tenth of the ice-free land surface is under intense human management, half under medium and one-fifth under extensive management. Based on our review, we cluster these ten management activities into three groups: (i) management activities for which data sets are available, and for which a good knowledge base exists (cropland harvest and irrigation); (ii) management activities for which sufficient knowledge on biogeochemical and biophysical effects exists but robust global data sets are lacking (forest harvest, tree species selection, grazing and mowing harvest, N fertilization); and (iii) land management practices with severe data gaps concomitant with an unsatisfactory level of process understanding (crop species selection, artificial wetland drainage, tillage and fire management and crop residue management, an element of crop harvest). Although we identify multiple impediments to progress, we conclude that the current status of process understanding and data availability is sufficient to advance with incorporating management in, for example, Earth system or dynamic vegetation models in order to provide a systematic assessment of their role in the Earth system. This review contributes to a strategic prioritization of research efforts across multiple disciplines, including land system research, ecological research and Earth system modelling. © 2016 John Wiley & Sons Ltd.
Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel
2016-03-01
This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.
NASA Astrophysics Data System (ADS)
Escriva-Bou, A.; Lund, J. R.; Pulido-Velazquez, M.; Medellin-Azuara, J.
2015-12-01
Most individual processes relating water and energy interdependence have been assessed in many different ways over the last decade. It is time to step up and include the results of these studies in management by proportionating a tool for integrating these processes in decision-making to effectively understand the tradeoffs between water and energy from management options and scenarios. A simple but powerful decision support system (DSS) for water management is described that includes water-related energy use and GHG emissions not solely from the water operations, but also from final water end uses, including demands from cities, agriculture, environment and the energy sector. Because one of the main drivers of energy use and GHG emissions is water pumping from aquifers, the DSS combines a surface water management model with a simple groundwater model, accounting for their interrelationships. The model also explicitly includes economic data to optimize water use across sectors during shortages and calculate return flows from different uses. Capabilities of the DSS are demonstrated on a case study over California's intertied water system. Results show that urban end uses account for most GHG emissions of the entire water cycle, but large water conveyance produces significant peaks over the summer season. Also the development of more efficient water application on the agricultural sector has increased the total energy consumption and the net water use in the basins.
Space station operations task force. Panel 4 report: Management integration
NASA Technical Reports Server (NTRS)
1987-01-01
The Management Integration Panel of the Space Station Operations Task Force was chartered to provide a structure and ground rules for integrating the efforts of the other three panels and to address a number of cross cutting issues that affect all areas of space station operations. Issues addressed include operations concept implementation, alternatives development and integration process, strategic policy issues and options, and program management emphasis areas.
Risk Management Considerations for Interoperable Acquisition
2006-08-01
Electronics Engineers (IEEE) to harmonize the standards for software (IEEE 12207 ) and system (IEEE 15288) life-cycle processes. A goal of this harmonization...management ( ISO /IEC 16085) is being generalized to apply to the systems level. The revised, generalized standard will add require- ments and guidance for the...risk management. The documents include the following: • ISO /IEC Guide 73: Risk Management—Vocabulary—Guidelines for use in stan- dards [ ISO 02
Soliciting scientific information and beliefs in predictive modeling and adaptive management
NASA Astrophysics Data System (ADS)
Glynn, P. D.; Voinov, A. A.; Shapiro, C. D.
2015-12-01
Post-normal science requires public engagement and adaptive corrections in addressing issues with high complexity and uncertainty. An adaptive management framework is presented for the improved management of natural resources and environments through a public participation process. The framework solicits the gathering and transformation and/or modeling of scientific information but also explicitly solicits the expression of participant beliefs. Beliefs and information are compared, explicitly discussed for alignments or misalignments, and ultimately melded back together as a "knowledge" basis for making decisions. An effort is made to recognize the human or participant biases that may affect the information base and the potential decisions. In a separate step, an attempt is made to recognize and predict the potential "winners" and "losers" (perceived or real) of any decision or action. These "winners" and "losers" include present human communities with different spatial, demographic or socio-economic characteristics as well as more dispersed or more diffusely characterized regional or global communities. "Winners" and "losers" may also include future human communities as well as communities of other biotic species. As in any adaptive management framework, assessment of predictions, iterative follow-through and adaptation of policies or actions is essential, and commonly very difficult or impossible to achieve. Recognizing beforehand the limits of adaptive management is essential. More generally, knowledge of the behavioral and economic sciences and of ethics and sociology will be key to a successful implementation of this adaptive management framework. Knowledge of biogeophysical processes will also be essential, but by definition of the issues being addressed, will always be incomplete and highly uncertain. The human dimensions of the issues addressed and the participatory processes used carry their own complexities and uncertainties. Some ideas and principles are provided that may help guide and implement the proposed adaptive management framework and its public and stakeholder engagement processes. Examples and characteristics of issues that could be beneficially addressed through the proposed framework will also be presented.
2010-01-01
Abstract Background The home-management of malaria strategy seeks to improve prompt and effective anti-malarial drug use through the informal sector, with a potential channel being the Private Medicine Retailers (PMRs). Previous evaluations of PMR programmes focused on their impact on retailer knowledge and practices, with limited evidence about the influence of implementation processes on the impacts at scale. This paper examines how the implementation processes of three PMR programmes in Kenya, each scaled up within a district, contributed to the outcomes observed. These were a Ministry of Health programme in Kwale district; and two programmes supported by non-governmental organizations in collaboration with government in Kisii Central and Bungoma districts. Methods The research methods included 24 focus group discussions with clients and PMRs, 19 in-depth interviews with implementing actors, document review and a diary of events. The data were analysed using the combination of a broad policy analysis framework and more specific scaling up/diffusion of innovations frameworks. Results The Kisii programme, a case study of successful implementation, was underpinned by good relationships between district health managers and a “resource team”, supported by a memorandum of understanding which enabled successful implementation. It had flexible budgetary and decision making processes which were responsive to local contexts, and took account of local socio-economic activities. In contrast, the Kwale programme, which had implementation challenges, was characterised by a complex funding process, with lengthy timelines, that was tied to the government financial management system which constrained implementation Although there was a flexible funding system in Bungoma, a perceived lack of transparency in fund management, inadequate management of inter-organisational relationships, and inability to adapt and respond to changing circumstances led to implementation difficulties. Conclusions For effective scaling up of PMR programmes, the provision of technical support and adequate resources are vital, but not sufficient on their own. An active strategy to manage relationships between implementing actors through effective communication mechanisms is essential. Successful outcomes may be realised if a strong and transparent management system, including management of financial resources, is put in place. This study provides evidence of the value of assessing implementation processes as part of impact evaluation for public health programmes. PMID:20594373
Abuya, Timothy; Amin, Abdinasir; Molyneux, Sassy; Akhwale, Willis; Marsh, Vicki; Gilson, Lucy
2010-07-02
The home-management of malaria strategy seeks to improve prompt and effective anti-malarial drug use through the informal sector, with a potential channel being the Private Medicine Retailers (PMRs). Previous evaluations of PMR programmes focused on their impact on retailer knowledge and practices, with limited evidence about the influence of implementation processes on the impacts at scale. This paper examines how the implementation processes of three PMR programmes in Kenya, each scaled up within a district, contributed to the outcomes observed. These were a Ministry of Health programme in Kwale district; and two programmes supported by non-governmental organizations in collaboration with government in Kisii Central and Bungoma districts. The research methods included 24 focus group discussions with clients and PMRs, 19 in-depth interviews with implementing actors, document review and a diary of events. The data were analysed using the combination of a broad policy analysis framework and more specific scaling up/diffusion of innovations frameworks. The Kisii programme, a case study of successful implementation, was underpinned by good relationships between district health managers and a "resource team", supported by a memorandum of understanding which enabled successful implementation. It had flexible budgetary and decision making processes which were responsive to local contexts, and took account of local socio-economic activities. In contrast, the Kwale programme, which had implementation challenges, was characterised by a complex funding process, with lengthy timelines, that was tied to the government financial management system which constrained implementation Although there was a flexible funding system in Bungoma, a perceived lack of transparency in fund management, inadequate management of inter-organisational relationships, and inability to adapt and respond to changing circumstances led to implementation difficulties. For effective scaling up of PMR programmes, the provision of technical support and adequate resources are vital, but not sufficient on their own. An active strategy to manage relationships between implementing actors through effective communication mechanisms is essential. Successful outcomes may be realised if a strong and transparent management system, including management of financial resources, is put in place. This study provides evidence of the value of assessing implementation processes as part of impact evaluation for public health programmes.
NASA Astrophysics Data System (ADS)
Biddoccu, Marcella; Ferraris, Stefano; Opsi, Francesca; Cavallo, Eugenio
2014-05-01
Long-term data have been collected by IMAMOTER-CNR from field-scale vineyard plots within the Tenuta Cannona Vine and Wine Experimental Centre of Regione Piemonte, which is located in a valuable vine production area in north-western Italy. Since 2000, runoff and soil erosion monitoring has been carried out under natural rainfall conditions on three parallel field plots (75 m long and 16,5 m wide, slope gradient about 15%) that are conducted with different inter-rows soil management techniques (conventional tillage, reduced tillage, controlled grass cover). Experimental plots are part of a 16-hectars experimental vineyard, managed in according to conventional farming for wine production. Recurrent surveys have been carried out in the runoff plots to investigate spatial and temporal variability of the soil bulk density, soil moisture and penetration resistance. The primary intent of the program was to evaluate the effects of agricultural management practices and tractor traffic on the hydrologic, soil erosion and soil compaction processes in vineyard. The Cannona Data Base (CDB) represents a data collection which is unique in Italy, showing the response of soil to rainfall in terms of runoff and soil erosion over more than a decade. It includes data for more than 200 runoff events and over 70 soil loss events; moreover, periodic measurements for soil physical characteristics are included for the three plots. The CDB can now be accessed via a website supported by the CNR, that is addressed to water and land management researchers and professionals. The CDB is currently used to calibrate a model for runoff and soil erosion prediction in vineyard environment. The CDB website includes a descriptive and informative section, which contains results of over than 10 years of experimental activity, reports and presentations, addressed to enhance the awareness of citizens and stakeholders about land degradation processes and about impacts of different soil management practices on water and soil conservation. The monitoring activities at the Cannona Experimental Site are currently carried out and implemented in order to improve the understanding of the soil management effects on soil hydrology, erosion and compaction in sloping vineyards. Land use and soil management strongly influence the hydrologic processes in the soil. In Italy vines are widely cultivated on hills and mountain slopes, within areas which are frequently affected by landslides. Such natural events are strictly related to hydrologic behavior of the soil, that drives the runoff formation on slopes and the consequent sediment delivery to water courses. Data from the CDB could be used in a multidisciplinary approach to investigate interactions among land use/ soil management and natural processes at different scales.