Sample records for management process management

  1. 23 CFR 450.320 - Congestion management process in transportation management areas.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Congestion management process in transportation... Programming § 450.320 Congestion management process in transportation management areas. (a) The transportation planning process in a TMA shall address congestion management through a process that provides for safe and...

  2. 23 CFR 450.320 - Congestion management process in transportation management areas.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Congestion management process in transportation... Programming § 450.320 Congestion management process in transportation management areas. (a) The transportation planning process in a TMA shall address congestion management through a process that provides for safe and...

  3. 23 CFR 450.320 - Congestion management process in transportation management areas.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Congestion management process in transportation... Programming § 450.320 Congestion management process in transportation management areas. (a) The transportation planning process in a TMA shall address congestion management through a process that provides for safe and...

  4. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  5. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  6. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  7. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  8. TQM (Total Quality Management) SPARC (Special Process Action Review Committees) Handbook

    DTIC Science & Technology

    1989-08-01

    This document describes the techniques used to support and guide the Special Process Action Review Committees for accomplishing their goals for Total Quality Management (TQM). It includes concepts and definitions, checklists, sample formats, and assessment criteria. Keywords: Continuous process improvement; Logistics information; Process analysis; Quality control; Quality assurance; Total Quality Management ; Statistical processes; Management Planning and control; Management training; Management information systems.

  9. Business Process Reengineering in the Inventory Management to Improve Aircraft Maintenance Operations in the Indonesian Air Force

    DTIC Science & Technology

    2006-06-01

    research will cover an overview of business process engineering (BPR) and operation management . The focus will be on the basic process of BPR, inventory...management and improvement of the process of business operation management to appropriately provide a basic model for the Indonesian Air Force in...discuss the operation management aspects of inventory management and process improvement, including Economic Order Quantity, Material Requirement

  10. An Application of Business Process Management to Health Care Facilities.

    PubMed

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  11. Survey process quality: a question of healthcare manager approach.

    PubMed

    Nilsson, Petra; Blomqvist, Kerstin

    2017-08-14

    Purpose The purpose of this paper is to explore how healthcare first-line managers think about and act regarding workplace survey processes. Design/methodology/approach This interview study was performed at a hospital in south Sweden. First-line healthcare managers ( n=24) volunteered. The analysis was inspired by phenomenography, which aims to describe the ways in which different people experience a phenomenon. The phenomenon was a workplace health promotion (WHP) survey processes. Findings Four main WHP survey process approaches were identified among the managers: as a possibility, as a competition, as a work task among others and as an imposition. For each, three common subcategories emerged; how managers: stated challenges and support from hospital management; described their own work group and collaboration with other managers; and expressed themselves and their situation in their roles as first-line managers. Practical implications Insights into how hospital management can understand their first-line managers' motivation for survey processes and practical suggestions and how managers can work proactively at organizational, group and individual level are presented. Originality/value Usually these studies focus on those who should respond to a survey; not those who should run the survey process. Focusing on managers and not co-workers can lead to more committed and empowered managers and thereby success in survey processes.

  12. Health care managers' views on and approaches to implementing models for improving care processes.

    PubMed

    Andreasson, Jörgen; Eriksson, Andrea; Dellve, Lotta

    2016-03-01

    To develop a deeper understanding of health-care managers' views on and approaches to the implementation of models for improving care processes. In health care, there are difficulties in implementing models for improving care processes that have been decided on by upper management. Leadership approaches to this implementation can affect the outcome. In-depth interviews with first- and second-line managers in Swedish hospitals were conducted and analysed using grounded theory. 'Coaching for participation' emerged as a central theme for managers in handling top-down initiated process development. The vertical approach in this coaching addresses how managers attempt to sustain unit integrity through adapting and translating orders from top management. The horizontal approach in the coaching refers to managers' strategies for motivating and engaging their employees in implementation work. Implementation models for improving care processes require a coaching leadership built on close manager-employee interaction, mindfulness regarding the pace of change at the unit level, managers with the competence to share responsibility with their teams and engaged employees with the competence to share responsibility for improving the care processes, and organisational structures that support process-oriented work. Implications for nursing management are the importance of giving nurse managers knowledge of change management. © 2015 John Wiley & Sons Ltd.

  13. 44 CFR 204.23 - Processing a request for a fire management assistance declaration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.23 Processing a request for a fire management assistance... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Processing a request for a fire management assistance declaration. 204.23 Section 204.23 Emergency Management and Assistance...

  14. 44 CFR 204.23 - Processing a request for a fire management assistance declaration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.23 Processing a request for a fire management assistance... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Processing a request for a fire management assistance declaration. 204.23 Section 204.23 Emergency Management and Assistance...

  15. 44 CFR 204.23 - Processing a request for a fire management assistance declaration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.23 Processing a request for a fire management assistance... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Processing a request for a fire management assistance declaration. 204.23 Section 204.23 Emergency Management and Assistance...

  16. 44 CFR 204.23 - Processing a request for a fire management assistance declaration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.23 Processing a request for a fire management assistance... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Processing a request for a fire management assistance declaration. 204.23 Section 204.23 Emergency Management and Assistance...

  17. Understanding and managing organizational change: implications for public health management.

    PubMed

    Thompson, Jon M

    2010-01-01

    Managing organizational change has become a significant responsibility of managers. Managing the change process within public health organizations is important because appropriately and systematically managing change is linked to improved organizational performance. However, change is difficult and the change process poses formidable challenges for managers. Managers themselves face increased pressure to respond to environmental influences and provide the necessary leadership to their organizations in the change process. In fact, managing organizational change has become a key competency for healthcare managers. This article addresses the important topic of organizational change in public health organizations. It provides a conceptual foundation for understanding organizational change and its relationship to healthcare organizational performance, and then discusses the types and nature of change, using some examples and evidence from those organizations that have successfully managed change. A framework for guiding public health managers in the change management process is provided. The article concludes with suggested management competencies to establish a change-oriented organization with the culture and capacity for change.

  18. An Extensible Information Grid for Risk Management

    NASA Technical Reports Server (NTRS)

    Maluf, David A.; Bell, David G.

    2003-01-01

    This paper describes recent work on developing an extensible information grid for risk management at NASA - a RISK INFORMATION GRID. This grid is being developed by integrating information grid technology with risk management processes for a variety of risk related applications. To date, RISK GRID applications are being developed for three main NASA processes: risk management - a closed-loop iterative process for explicit risk management, program/project management - a proactive process that includes risk management, and mishap management - a feedback loop for learning from historical risks that escaped other processes. This is enabled through an architecture involving an extensible database, structuring information with XML, schemaless mapping of XML, and secure server-mediated communication using standard protocols.

  19. Process Reengineering for Quality Improvement in ICU Based on Taylor's Management Theory.

    PubMed

    Tao, Ziqi

    2015-06-01

    Using methods including questionnaire-based surveys and control analysis, we analyzed the improvements in the efficiency of ICU rescue, service quality, and patients' satisfaction, in Xuzhou Central Hospital after the implementation of fine management, with an attempt to further introduce the concept of fine management and implement the brand construction. Originating in Taylor's "Theory of Scientific Management" (1982), fine management uses programmed, standardized, digitalized, and informational approaches to ensure each unit of an organization is running with great accuracy, high efficiency, strong coordination, and at sustained duration (Wang et al., Fine Management, 2007). The nature of fine management is a process that breaks up the strategy and goal, and executes it. Strategic planning takes place at every part of the process. Fine management demonstrates that everybody has a role to play in the management process, every area must be examined through the management process, and everything has to be managed (Zhang et al., The Experience of Hospital Nursing Precise Management, 2006). In other words, this kind of management theory demands all people to be involved in the entire process (Liu and Chen, Med Inf, 2007). As public hospital reform is becoming more widespread, it becomes imperative to "build a unified and efficient public hospital management system" and "improve the quality of medical services" (Guidelines on the Pilot Reform of Public Hospitals, 2010). The execution of fine management is of importance in optimizing the medical process, improving medical services and building a prestigious hospital brand.

  20. Sustaining a Mature Risk Management Process: Ensuring the International Space Station for a Vibrant Future

    NASA Technical Reports Server (NTRS)

    Raftery, Michael; Carter-Journet, Katrina

    2013-01-01

    The International Space Station (ISS) risk management methodology is an example of a mature and sustainable process. Risk management is a systematic approach used to proactively identify, analyze, plan, track, control, communicate, and document risks to help management make risk-informed decisions that increase the likelihood of achieving program objectives. The ISS has been operating in space for over 14 years and permanently crewed for over 12 years. It is the longest surviving habitable vehicle in low Earth orbit history. Without a mature and proven risk management plan, it would be increasingly difficult to achieve mission success throughout the life of the ISS Program. A successful risk management process must be able to adapt to a dynamic program. As ISS program-level decision processes have evolved, so too has the ISS risk management process continued to innovate, improve, and adapt. Constant adaptation of risk management tools and an ever-improving process is essential to the continued success of the ISS Program. Above all, sustained support from program management is vital to risk management continued effectiveness. Risk management is valued and stressed as an important process by the ISS Program.

  1. Adaptive Management for Urban Watersheds: The Slavic Village Pilot Project

    EPA Science Inventory

    Adaptive management is an environmental management strategy that uses an iterative process of decision-making to reduce the uncertainty in environmental management via system monitoring. A central tenet of adaptive management is that management involves a learning process that ca...

  2. An Investigation of the Applicability of Modern Management Processes by Industrial Managers in Turkey.

    ERIC Educational Resources Information Center

    Lauter, Geza Peter

    This study noted American concepts of modern management which Turkish industrial managers tend to find difficult: identified cultural, economic, and other factors that impede application of modern management processes; and compared the practices of American overseas managers with those of Turkish managers of domestic firms. Managerial performance…

  3. [Definition and stabilization of processes I. Management processes and support in a Urology Department].

    PubMed

    Pascual, Carlos; Luján, Marcos; Mora, José Ramón; Chiva, Vicente; Gamarra, Manuela

    2015-01-01

    The implantation of total quality management models in clinical departments can better adapt to the 2009 ISO 9004 model. An essential part of implantation of these models is the establishment of processes and their stabilization. There are four types of processes: key, management, support and operative (clinical). Management processes have four parts: process stabilization form, process procedures form, medical activities cost estimation form and, process flow chart. In this paper we will detail the creation of an essential process in a surgical department, such as the process of management of the surgery waiting list.

  4. Weaknesses in Applying a Process Approach in Industry Enterprises

    NASA Astrophysics Data System (ADS)

    Kučerová, Marta; Mĺkva, Miroslava; Fidlerová, Helena

    2012-12-01

    The paper deals with a process approach as one of the main principles of the quality management. Quality management systems based on process approach currently represents one of a proofed ways how to manage an organization. The volume of sales, costs and profit levels are influenced by quality of processes and efficient process flow. As results of the research project showed, there are some weaknesses in applying of the process approach in the industrial routine and it has been often only a formal change of the functional management to process management in many organizations in Slovakia. For efficient process management it is essential that companies take attention to the way how to organize their processes and seek for their continuous improvement.

  5. Quality data collection and management technology of aerospace complex product assembly process

    NASA Astrophysics Data System (ADS)

    Weng, Gang; Liu, Jianhua; He, Yongxi; Zhuang, Cunbo

    2017-04-01

    Aiming at solving problems of difficult management and poor traceability for discrete assembly process quality data, a data collection and management method is proposed which take the assembly process and BOM as the core. Data collection method base on workflow technology, data model base on BOM and quality traceability of assembly process is included in the method. Finally, assembly process quality data management system is developed and effective control and management of quality information for complex product assembly process is realized.

  6. Configuration and Data Management Process and the System Safety Professional

    NASA Technical Reports Server (NTRS)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  7. Dissociated neural processing for decisions in managers and non-managers.

    PubMed

    Caspers, Svenja; Heim, Stefan; Lucas, Marc G; Stephan, Egon; Fischer, Lorenz; Amunts, Katrin; Zilles, Karl

    2012-01-01

    Functional neuroimaging studies of decision-making so far mainly focused on decisions under uncertainty or negotiation with other persons. Dual process theory assumes that, in such situations, decision making relies on either a rapid intuitive, automated or a slower rational processing system. However, it still remains elusive how personality factors or professional requirements might modulate the decision process and the underlying neural mechanisms. Since decision making is a key task of managers, we hypothesized that managers, facing higher pressure for frequent and rapid decisions than non-managers, prefer the heuristic, automated decision strategy in contrast to non-managers. Such different strategies may, in turn, rely on different neural systems. We tested managers and non-managers in a functional magnetic resonance imaging study using a forced-choice paradigm on word-pairs. Managers showed subcortical activation in the head of the caudate nucleus, and reduced hemodynamic response within the cortex. In contrast, non-managers revealed the opposite pattern. With the head of the caudate nucleus being an initiating component for process automation, these results supported the initial hypothesis, hinting at automation during decisions in managers. More generally, the findings reveal how different professional requirements might modulate cognitive decision processing.

  8. Dissociated Neural Processing for Decisions in Managers and Non-Managers

    PubMed Central

    Caspers, Svenja; Heim, Stefan; Lucas, Marc G.; Stephan, Egon; Fischer, Lorenz; Amunts, Katrin; Zilles, Karl

    2012-01-01

    Functional neuroimaging studies of decision-making so far mainly focused on decisions under uncertainty or negotiation with other persons. Dual process theory assumes that, in such situations, decision making relies on either a rapid intuitive, automated or a slower rational processing system. However, it still remains elusive how personality factors or professional requirements might modulate the decision process and the underlying neural mechanisms. Since decision making is a key task of managers, we hypothesized that managers, facing higher pressure for frequent and rapid decisions than non-managers, prefer the heuristic, automated decision strategy in contrast to non-managers. Such different strategies may, in turn, rely on different neural systems. We tested managers and non-managers in a functional magnetic resonance imaging study using a forced-choice paradigm on word-pairs. Managers showed subcortical activation in the head of the caudate nucleus, and reduced hemodynamic response within the cortex. In contrast, non-managers revealed the opposite pattern. With the head of the caudate nucleus being an initiating component for process automation, these results supported the initial hypothesis, hinting at automation during decisions in managers. More generally, the findings reveal how different professional requirements might modulate cognitive decision processing. PMID:22927984

  9. The peculiarities of process-based approach realization in transport sector company management

    NASA Astrophysics Data System (ADS)

    Khripko, Elena; Sidorov, Gennadiy

    2017-10-01

    In the present article we study the phenomena of multiple meaning in understanding process-based management method in construction of transport infrastructure facilities. The idea of multiple meaning is in distortions which appear during reception of the management process paradigm in organizational environment of transport sector. The cause of distortion in process management is organizational resistance. The distortions of management processes are discovered at the level of diffusion among spheres of responsibility, collision in forms of functional, project and process interaction between the owner of the process and its participants. The level of distortion is affected by the attitude towards the result of work which means that process understanding of the result is replaced by the functional one in practice of management. This transfiguration is the consequence of regressive defensive mechanisms of the organizational environment. On the base of experience of forming process management in construction of transport infrastructure facilities company of the issues of diagnostics of various forms of organizational resistance and ways of reducing the destructive influence on managing processes are reviewed.

  10. A combined disease management and process modeling approach for assessing and improving care processes: a fall management case-study.

    PubMed

    Askari, Marjan; Westerhof, Richard; Eslami, Saied; Medlock, Stephanie; de Rooij, Sophia E; Abu-Hanna, Ameen

    2013-10-01

    To propose a combined disease management and process modeling approach for evaluating and improving care processes, and demonstrate its usability and usefulness in a real-world fall management case study. We identified essential disease management related concepts and mapped them into explicit questions meant to expose areas for improvement in the respective care processes. We applied the disease management oriented questions to a process model of a comprehensive real world fall prevention and treatment program covering primary and secondary care. We relied on interviews and observations to complete the process models, which were captured in UML activity diagrams. A preliminary evaluation of the usability of our approach by gauging the experience of the modeler and an external validator was conducted, and the usefulness of the method was evaluated by gathering feedback from stakeholders at an invitational conference of 75 attendees. The process model of the fall management program was organized around the clinical tasks of case finding, risk profiling, decision making, coordination and interventions. Applying the disease management questions to the process models exposed weaknesses in the process including: absence of program ownership, under-detection of falls in primary care, and lack of efficient communication among stakeholders due to missing awareness about other stakeholders' workflow. The modelers experienced the approach as usable and the attendees of the invitational conference found the analysis results to be valid. The proposed disease management view of process modeling was usable and useful for systematically identifying areas of improvement in a fall management program. Although specifically applied to fall management, we believe our case study is characteristic of various disease management settings, suggesting the wider applicability of the approach. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  11. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  12. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  13. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  14. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  15. 15 CFR 923.13 - Energy facility planning process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Energy facility planning process. 923... RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Uses Subject to Management § 923.13 Energy facility planning process. The management program must contain a planning process for energy facilities...

  16. Leading processes of patient care and treatment in hierarchical healthcare organizations in Sweden--process managers' experiences.

    PubMed

    Nilsson, Kerstin; Sandoff, Mette

    2015-01-01

    The purpose of this study is to gain better understanding of the roles and functions of process managers by describing Swedish process managers' experiences of leading processes involving patient care and treatment when working in a hierarchical health-care organization. This study is based on an explorative design. The data were gathered from interviews with 12 process managers at three Swedish hospitals. These data underwent qualitative and interpretative analysis with a modified editing style. The process managers' experiences of leading processes in a hierarchical health-care organization are described under three themes: having or not having a mandate, exposure to conflict situations and leading process development. The results indicate a need for clarity regarding process manager's responsibility and work content, which need to be communicated to all managers and staff involved in the patient care and treatment process, irrespective of department. There also needs to be an emphasis on realistic expectations and orientation of the goals that are an intrinsic part of the task of being a process manager. Generalizations from the results of the qualitative interview studies are limited, but a deeper understanding of the phenomenon was reached, which, in turn, can be transferred to similar settings. This study contributes qualitative descriptions of leading care and treatment processes in a functional, hierarchical health-care organization from process managers' experiences, a subject that has not been investigated earlier.

  17. [Does clinical risk management require a structured conflict management?].

    PubMed

    Neumann, Stefan

    2015-01-01

    A key element of clinical risk management is the analysis of errors causing near misses or patient damage. After analyzing the causes and circumstances, measures for process improvement have to be taken. Process management, human resource development and other established methods are used. If an interpersonal conflict is a contributory factor to the error, there is usually no structured conflict management available which includes selection criteria for various methods of conflict processing. The European University Viadrina in Frankfurt (Oder) has created a process model for introducing a structured conflict management system which is suitable for hospitals and could fill the gap in the methodological spectrum of clinical risk management. There is initial evidence that a structured conflict management reduces staff fluctuation and hidden conflict costs. This article should be understood as an impulse for discussion on to what extent the range of methods of clinical risk management should be complemented by conflict management.

  18. Methods for assessing fish populations

    Treesearch

    Kevin L. Pope; Steve E. Lochmann; Michael K. Young

    2010-01-01

    Fisheries managers are likely to assess fish populations at some point during the fisheries management process. Managers that follow the fisheries management process (see Chapter 5) might find their knowledge base insufficient during the steps of problem identification or management action and must assess a population before appropriate actions can be taken. Managers...

  19. 49 CFR 659.31 - Hazard management process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Hazard management process. 659.31 Section 659.31... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency..., operational changes, or other changes within the rail transit environment. (b) The hazard management process...

  20. 49 CFR 659.31 - Hazard management process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Hazard management process. 659.31 Section 659.31... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency..., operational changes, or other changes within the rail transit environment. (b) The hazard management process...

  1. 49 CFR 659.31 - Hazard management process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Hazard management process. 659.31 Section 659.31... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency..., operational changes, or other changes within the rail transit environment. (b) The hazard management process...

  2. Establishment of Textbook Information Management System Based on Active Server Page

    ERIC Educational Resources Information Center

    Geng, Lihua

    2011-01-01

    In the process of textbook management of universities, the flow of storage, collection and check of textbook is quite complicated and daily management flow and system also seriously constrains the efficiency of the management process. Thus, in order to combine the information management model and the traditional management model, it is necessary…

  3. [Relationship Between Members Satisfaction with Service Club Management Processes and Perception of Club Management System.

    ERIC Educational Resources Information Center

    Dawson, Frances Trigg

    A study was made to determine the relationships between (1) satisfaction of members with service club management processes and member's perception of management systems, (2) perception of service club management system to selected independent variables, and (3) satisfaction to perception of service club management systems with independent…

  4. Building a competent health manager at district level: a grounded theory study from Eastern Uganda.

    PubMed

    Tetui, Moses; Hurtig, Anna-Karin; Ekirpa-Kiracho, Elizabeth; Kiwanuka, Suzanne N; Coe, Anna-Britt

    2016-11-21

    Health systems in low-income countries are often characterized by poor health outcomes. While many reasons have been advanced to explain the persistently poor outcomes, management of the system has been found to play a key role. According to a WHO framework, the management of health systems is central to its ability to deliver needed health services. In this study, we examined how district managers in a rural setting in Uganda perceived existing approaches to strengthening management so as to provide a pragmatic and synergistic model for improving management capacity building. Twenty-two interviews were conducted with district level administrative and political managers, district level health managers and health facility managers to understand their perceptions and definitions of management and capacity building. Kathy Charmaz's constructive approach to grounded theory informed the data analysis process. An interative, dynamic and complex model with three sub-process of building a competent health manager was developed. A competent manager was understood as one who knew his/her roles, was well informed and was empowered to execute management functions. Professionalizing health managers which was viewed as the foundation, the use of engaging learning approaches as the inside contents and having a supportive work environment the frame of the model were the sub-processes involved in the model. The sub-processes were interconnected although the respondents agreed that having a supportive work environment was more time and effort intensive relative to the other two sub-processes. The model developed in our study makes four central contributions to enhance the WHO framework and the existing literature. First, it emphasizes management capacity building as an iterative, dynamic and complex process rather than a set of characteristics of competent managers. Second, our model suggests the need for professionalization of health managers at different levels of the health system. Third, our model underscores the benefits that could be accrued from the use of engaging learning approaches through prolonged and sustained processes that act in synergy. Lastly, our model postulates that different resource investments and a varied range of stakeholders could be required at each of the sub-processes.

  5. Assessment of Navy Contract Management Processes

    DTIC Science & Technology

    2016-02-22

    Assessment of Navy Contract Management Processes 22 February 2016 Dr. Rene G. Rendon, Associate Professor Graduate School of Business ...Know) for each survey item in each contract management process area. Acquisition Research Program Graduate School of Business ...management process . Figure 1. U.S. Navy CMMM Maturity Levels Acquisition Research Program Graduate School of Business

  6. Adaptive harvest management of North American waterfowl populations - recent successes and future prospects

    USGS Publications Warehouse

    Nichols, J.D.; Runge, M.C.; Johnson, F.A.; Williams, B.K.; Schodde, Richard; Hannon, Susan; Scheiffarth, Gregor; Bairlein, Franz

    2006-01-01

    The history of North American waterfowl harvest management has been characterized by attempts to use population monitoring data to make informed harvest management decisions. Early attempts can be characterized as intuitive decision processes, and later efforts were guided increasingly by population models and associated predictions. In 1995, a formal adaptive management process was implemented, and annual decisions about duck harvest regulations in the United States are still based on this process. This formal decision process is designed to deal appropriately with the various forms of uncertainty that characterize management decisions, environmental uncertainty, structural uncertainty, partial controllability and partial observability. The key components of the process are (1) objectives, (2) potential management actions, (3) model(s) of population response to management actions, (4) credibility measures for these models, and (5) a monitoring program. The operation of this iterative process is described, and a brief history of a decade of its use is presented. Future challenges range from social and political issues such as appropriate objectives and management actions, to technical issues such as multispecies management, geographic allocation of harvest, and incorporation of actions that include habitat acquisition and management.

  7. [Process management in the hospital pharmacy for the improvement of the patient safety].

    PubMed

    Govindarajan, R; Perelló-Juncá, A; Parès-Marimòn, R M; Serrais-Benavente, J; Ferrandez-Martí, D; Sala-Robinat, R; Camacho-Calvente, A; Campabanal-Prats, C; Solà-Anderiu, I; Sanchez-Caparrós, S; Gonzalez-Estrada, J; Martinez-Olalla, P; Colomer-Palomo, J; Perez-Mañosas, R; Rodríguez-Gallego, D

    2013-01-01

    To define a process management model for a hospital pharmacy in order to measure, analyse and make continuous improvements in patient safety and healthcare quality. In order to implement process management, Igualada Hospital was divided into different processes, one of which was the Hospital Pharmacy. A multidisciplinary management team was given responsibility for each process. For each sub-process one person was identified to be responsible, and a working group was formed under his/her leadership. With the help of each working group, a risk analysis using failure modes and effects analysis (FMEA) was performed, and the corresponding improvement actions were implemented. Sub-process indicators were also identified, and different process management mechanisms were introduced. The first risk analysis with FMEA produced more than thirty preventive actions to improve patient safety. Later, the weekly analysis of errors, as well as the monthly analysis of key process indicators, permitted us to monitor process results and, as each sub-process manager participated in these meetings, also to assume accountability and responsibility, thus consolidating the culture of excellence. The introduction of different process management mechanisms, with the participation of people responsible for each sub-process, introduces a participative management tool for the continuous improvement of patient safety and healthcare quality. Copyright © 2012 SECA. Published by Elsevier Espana. All rights reserved.

  8. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  9. Public Managers Should Be Proactive

    ERIC Educational Resources Information Center

    Carlson, Thomas S.

    1976-01-01

    Future public managers should be proactive by creating management processes before problems arise. Planning prevents reactive or crisis managing. Future managers should also be prepared to meet dilemmas and paradoxes such as centralization versus decentralization of decision-making and work processes, politics versus administration dichotomy, and…

  10. Configuration Management Plan for the Tank Farm Contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    WEIR, W.R.

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less

  11. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  12. Risk Management Issues - An Aerospace Perspective

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks--risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements.. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner, Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  13. Design of distributed systems of hydrolithosphere processes management. A synthesis of distributed management systems

    NASA Astrophysics Data System (ADS)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The paper considers an important problem of designing distributed systems of hydrolithosphere processes management. The control actions on the hydrolithosphere processes under consideration are implemented by a set of extractive wells. The article shows the method of defining the approximation links for description of the dynamic characteristics of hydrolithosphere processes. The structure of distributed regulators, used in the management systems by the considered processes, is presented. The paper analyses the results of the synthesis of the distributed management system and the results of modelling the closed-loop control system by the parameters of the hydrolithosphere process.

  14. 49 CFR 659.31 - Hazard management process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., operational changes, or other changes within the rail transit environment. (b) The hazard management process must, at a minimum: (1) Define the rail transit agency's approach to hazard management and the... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency...

  15. 49 CFR 659.31 - Hazard management process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., operational changes, or other changes within the rail transit environment. (b) The hazard management process must, at a minimum: (1) Define the rail transit agency's approach to hazard management and the... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency...

  16. Adaptive management: Chapter 1

    USGS Publications Warehouse

    Allen, Craig R.; Garmestani, Ahjond S.; Allen, Craig R.; Garmestani, Ahjond S.

    2015-01-01

    Adaptive management is an approach to natural resource management that emphasizes learning through management where knowledge is incomplete, and when, despite inherent uncertainty, managers and policymakers must act. Unlike a traditional trial and error approach, adaptive management has explicit structure, including a careful elucidation of goals, identification of alternative management objectives and hypotheses of causation, and procedures for the collection of data followed by evaluation and reiteration. The process is iterative, and serves to reduce uncertainty, build knowledge and improve management over time in a goal-oriented and structured process.

  17. Adaptive management

    USGS Publications Warehouse

    Allen, Craig R.; Garmestani, Ahjond S.

    2015-01-01

    Adaptive management is an approach to natural resource management that emphasizes learning through management where knowledge is incomplete, and when, despite inherent uncertainty, managers and policymakers must act. Unlike a traditional trial and error approach, adaptive management has explicit structure, including a careful elucidation of goals, identification of alternative management objectives and hypotheses of causation, and procedures for the collection of data followed by evaluation and reiteration. The process is iterative, and serves to reduce uncertainty, build knowledge and improve management over time in a goal-oriented and structured process.

  18. Knowledge Management Enablers and Process in Hospital Organizations.

    PubMed

    Lee, Hyun-Sook

    2017-02-01

    This research aimed to investigate the effects of knowledge management enablers, such as organizational structure, leadership, learning, information technology systems, trust, and collaboration, on the knowledge management process of creation, storage, sharing, and application. Using data from self-administered questionnaires in four Korean tertiary hospitals, this survey investigated the main organizational factors affecting the knowledge management process in these organizations. A total of 779 questionnaires were analyzed using SPSS 18.0 and AMOS 18.0. The results showed that organizational factors affect the knowledge management process differently in each hospital organization. From a managerial perspective, the implications of these factors for developing organizational strategies that encourage and foster the knowledge management process are discussed.

  19. 36 CFR 1225.3 - What standards are used as guidance for this part?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... retain records), 9.10 (Documenting records management processes), 10 (Records management processes and... RECORDS ADMINISTRATION RECORDS MANAGEMENT SCHEDULING RECORDS § 1225.3 What standards are used as guidance... documentation—Records management. Paragraphs 4 (Benefits of records management), 6.3 (Responsibilities), 7.1...

  20. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  1. Spectrum Situational Awareness Capability: The Military Need and Potential Implementation Issues

    DTIC Science & Technology

    2006-10-01

    Management Sensor Systems Frequency Management EW Systems Frequency Management Allied Battlespace Spectrum Management Restricted Frequency List Frequency...Management Restricted Frequency List Frequency Allocation Table Civil Frequency Use Data Inputs Negotiation and allocation process © Dstl 2006 26th...Management Restricted Frequency List Data Inputs Negotiation and allocation process Frequency Allocation Table SSA ES INT COP etc WWW Spectrum

  2. Experimental application of Business Process Management technology to manage clinical pathways: a pediatric kidney transplantation follow up case.

    PubMed

    Andellini, Martina; Fernandez Riesgo, Sandra; Morolli, Federica; Ritrovato, Matteo; Cosoli, Piero; Petruzzellis, Silverio; Rosso, Nicola

    2017-11-03

    To test the application of Business Process Management technology to manage clinical pathways, using a pediatric kidney transplantation as case study, and to identify the benefits obtained from using this technology. Using a Business Process Management platform, we implemented a specific application to manage the clinical pathway of pediatric patients, and monitored the activities of the coordinator in charge of the case management during a 6-month period (from June 2015 to November 2015) using two methodologies: the traditional procedure and the one under study. The application helped physicians and nurses to optimize the amount of time and resources devoted to management purposes. In particular, time reduction was close to 60%. In addition, the reduction of data duplication, the integrated event management and the efficient data collection improved the quality of the service. The use of Business Process Management technology, usually related to well-defined processes with high management costs, is an established procedure in multiple environments; its use in healthcare, however, is innovative. The use of already accepted clinical pathways is known to improve outcomes. The combination of these two techniques, well established in their respective areas of application, could represent a revolution in clinical pathway management. The study has demonstrated that the use of this technology in a clinical environment, using a proper architecture and identifying a well-defined process, leads to real benefits in terms of resources optimization and quality improvement.

  3. 75 FR 26920 - Mid-Atlantic Fishery Management Council; Spiny Dogfish Amendment 3 Scoping Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... Fishery Management Council; Spiny Dogfish Amendment 3 Scoping Process AGENCY: National Marine Fisheries... the Spiny Dogfish Fishery Management Plan (FMP). This notice announces a public process to solicit... and New England Fishery Management Councils (Councils), in cooperation with NMFS, announce that they...

  4. A Practical Decision-Analysis Process for Forest Ecosystem Management

    Treesearch

    H. Michael Rauscher; F. Thomas Lloyd; David L. Loftis; Mark J. Twery

    2000-01-01

    Many authors have pointed out the need to firm up the 'fuzzy' ecosystem management paradigm and develop operationally practical processes to allow forest managers to accommodate more effectively the continuing rapid change in societal perspectives and goals. There are three spatial scales where clear, precise, practical ecosystem management processes are...

  5. Bridging the gap between finance and clinical operations with activity-based cost management.

    PubMed

    Storfjell, J L; Jessup, S

    1996-12-01

    Activity-based cost management (ABCM) is an exciting management tool that links financial information with operations. By determining the costs of specific activities and processes, nurse managers accurately determine true costs of services more accurately than traditional cost accounting methods, and then can target processes for improvement and monitor them for change and improvement. The authors describe the ABCM process applied to nursing management situations.

  6. 75 FR 50713 - Procedural Changes to the Fire Management Assistance Declaration Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    ... FEMA-2010-0036] RIN-1660-AA72 Procedural Changes to the Fire Management Assistance Declaration Process... Federal Emergency Management Agency (FEMA) is updating its Fire Management Assistance Grant Program regulations to reflect a change in the internal delegation of authority for fire management assistance...

  7. Outdoor Recreation Management

    ERIC Educational Resources Information Center

    Jubenville, Alan

    The complex problems facing the manager of an outdoor recreation area are outlined and discussed. Eighteen chapters cover the following primary concerns of the manager of such a facility: (1) an overview of the management process; (2) the basic outdoor recreation management model; (3) the problem-solving process; (4) involvement of the public in…

  8. 44 CFR 204.23 - Processing a request for a fire management assistance declaration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management assistance declaration. The Principal Advisor may consult with State agencies, usually emergency... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Processing a request for a fire management assistance declaration. 204.23 Section 204.23 Emergency Management and Assistance...

  9. Adaptive management for ecosystem services (j/a) | Science ...

    EPA Pesticide Factsheets

    Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with manage

  10. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  11. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  12. Clinical engineering and risk management in healthcare technological process using architecture framework.

    PubMed

    Signori, Marcos R; Garcia, Renato

    2010-01-01

    This paper presents a model that aids the Clinical Engineering to deal with Risk Management in the Healthcare Technological Process. The healthcare technological setting is complex and supported by three basics entities: infrastructure (IS), healthcare technology (HT), and human resource (HR). Was used an Enterprise Architecture - MODAF (Ministry of Defence Architecture Framework) - to model this process for risk management. Thus, was created a new model to contribute to the risk management in the HT process, through the Clinical Engineering viewpoint. This architecture model can support and improve the decision making process of the Clinical Engineering to the Risk Management in the Healthcare Technological process.

  13. Defense Depot Tracy Total Quality Management Plan

    DTIC Science & Technology

    1989-07-01

    PAGES TQM (Total Quality Management ), Depot Operations, Continuous Process Improvement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...make up our pcrceptions of Total Quality Management . Our goal is to improve those proven management processes that have brought us success while being...MANIAGEMENT F. QUALITY AUDITS OF PRODUCTS AND OPERATIONS ASSETS MANAGEMENT 00 i .......... / ~899 29 03 1 EFENSE DEPOT TACY TOTAL QUALITY MANAGEMENT PLAN

  14. Knowledge Management: A Model to Enhance Combatant Command Effectiveness

    DTIC Science & Technology

    2011-02-15

    implementing the change that is required to achieve the knowledge management vision.43 The Chief Knowledge Management Officer ( KMO ) is overall responsible for...the processes, people/culture and technology in the organization. The Chief KMO develops policy and leads the organization’s knowledge management...integrates team. Reporting directly to the Chief KMO is the Chief Process Manager, Chief Learning Manager and Chief Technology Officer

  15. Introducing the CERT (Trademark) Resiliency Engineering Framework: Improving the Security and Sustainability Processes

    DTIC Science & Technology

    2007-05-01

    business processes and services. 4. Security operations management addresses the day-to-day activities that the organization performs to protect the...Management TM – Technology Management Security Operations Management SOM – Security Operations Management 5.7.2 Important Operations Competency...deals with the provision of access rights to informa- tion and technical assets SOM – Security Operations Management , which addresses the fundamental

  16. A Comparative History of Department of Defense Management Reform from 1947 to 2005

    DTIC Science & Technology

    2006-12-01

    type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas from the business ...introduce some type of management reform agenda to improve the Department of Defense business processes and incorporate recent management ideas...Steering Group BMMP Business Management Modernization Plan BRAC Base Realignment and Closure C3I Command, Control, Communications, and Intelligence

  17. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  18. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  19. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  20. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  1. 25 CFR 1200.15 - What is the approval process for management plans?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 2 2014-04-01 2014-04-01 false What is the approval process for management plans? 1200... INTERIOR AMERICAN INDIAN TRUST FUND MANAGEMENT REFORM ACT Withdrawing Tribal Funds From Trust § 1200.15 What is the approval process for management plans? The Secretary will approve or disapprove each...

  2. Ready-to-Use Simulation: Demystifying Statistical Process Control

    ERIC Educational Resources Information Center

    Sumukadas, Narendar; Fairfield-Sonn, James W.; Morgan, Sandra

    2005-01-01

    Business students are typically introduced to the concept of process management in their introductory course on operations management. A very important learning outcome here is an appreciation that the management of processes is a key to the management of quality. Some of the related concepts are qualitative, such as strategic and behavioral…

  3. Issues Management and the Role of Strategic Planning. AIR 1985 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Lozier, G. Gregory; Chittipeddi, Kumar

    The integration of issues management into the institutional strategic planning process at Pennsylvania State University is discussed. The significance of issues management as an organizational process is also considered. Stages of the issues management process are: (1) scanning the external environment to identify strategic issues; (2) analyzing…

  4. Time Management and the Military Decision Making Process

    DTIC Science & Technology

    1992-12-18

    This monograph analyzes the military decision making process in terms of time management in order to determine if a timeline will expedite the...process. The monograph begins by establishing the importance of time and time management in planning. This section provides a general discussion of time, an...Perhaps using some of the techniques that other armies use will facilitate time management .... Time management , Decision making, Timeline, Mission analysis, Wargaming, Courses of action, OPORD, Brigade OPS.

  5. Identifying critical issues in recreation planning and management: improving the management-research partnership

    Treesearch

    John H. Schomaker; David W. Lime

    1988-01-01

    The "nominal group" process is a proven technique to systematically arrive at a consensus about critical information needs in recreation planning and management. Using this process, 41 managers who attended a 1983 conference on river management identified 114 specific information needs grouped under 11 general questions. Clearly, some concerns of...

  6. Innovation adoption processes for third party property management companies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shockman, Chris; Piette, Mary Ann

    2000-07-01

    Innovation adoption studies have never been applied to third party property management companies. These companies manage buildings for a fee as their primary business. Property management companies are influential in the adoption process for new technologies because they act as gatekeepers for technical information. This study analyzes radical and routine adoption process that are found in large, professionally operated property management companies. The process is explicated. The technical managers, and their role as technology gate keepers, are described. The distinction to the technical managers between routine and radical technology is that routine technologies do something in a new way andmore » radical technologies do something new. Observations concerning evaluation and adoption of information technologies are described. The findings suggest methods of successfully tailoring and introducing technologies to this market.« less

  7. The relationship between quality management practices and organisational performance: A structural equation modelling approach

    NASA Astrophysics Data System (ADS)

    Jamaluddin, Z.; Razali, A. M.; Mustafa, Z.

    2015-02-01

    The purpose of this paper is to examine the relationship between the quality management practices (QMPs) and organisational performance for the manufacturing industry in Malaysia. In this study, a QMPs and organisational performance framework is developed according to a comprehensive literature review which cover aspects of hard and soft quality factors in manufacturing process environment. A total of 11 hypotheses have been put forward to test the relationship amongst the six constructs, which are management commitment, training, process management, quality tools, continuous improvement and organisational performance. The model is analysed using Structural Equation Modeling (SEM) with AMOS software version 18.0 using Maximum Likelihood (ML) estimation. A total of 480 questionnaires were distributed, and 210 questionnaires were valid for analysis. The results of the modeling analysis using ML estimation indicate that the fits statistics of QMPs and organisational performance model for manufacturing industry is admissible. From the results, it found that the management commitment have significant impact on the training and process management. Similarly, the training had significant effect to the quality tools, process management and continuous improvement. Furthermore, the quality tools have significant influence on the process management and continuous improvement. Likewise, the process management also has a significant impact to the continuous improvement. In addition the continuous improvement has significant influence the organisational performance. However, the results of the study also found that there is no significant relationship between management commitment and quality tools, and between the management commitment and continuous improvement. The results of the study can be used by managers to prioritize the implementation of QMPs. For instances, those practices that are found to have positive impact on organisational performance can be recommended to managers so that they can allocate resources to improve these practices to get better performance.

  8. The sensitivity of current and future forest managers to climate-induced changes in ecological processes.

    PubMed

    Seidl, Rupert; Aggestam, Filip; Rammer, Werner; Blennow, Kristina; Wolfslehner, Bernhard

    2016-05-01

    Climate vulnerability of managed forest ecosystems is not only determined by ecological processes but also influenced by the adaptive capacity of forest managers. To better understand adaptive behaviour, we conducted a questionnaire study among current and future forest managers (i.e. active managers and forestry students) in Austria. We found widespread belief in climate change (94.7 % of respondents), and no significant difference between current and future managers. Based on intended responses to climate-induced ecosystem changes, we distinguished four groups: highly sensitive managers (27.7 %), those mainly sensitive to changes in growth and regeneration processes (46.7 %), managers primarily sensitive to regeneration changes (11.2 %), and insensitive managers (14.4 %). Experiences and beliefs with regard to disturbance-related tree mortality were found to particularly influence a manager's sensitivity to climate change. Our findings underline the importance of the social dimension of climate change adaptation, and suggest potentially strong adaptive feedbacks between ecosystems and their managers.

  9. The association between effectiveness of the management processes and quality of health services from the perspective of the managers in the university hospitals of Ahvaz, Iran

    PubMed Central

    Faraji-Khiavi, F; Ghobadian, S; Moradi-Joo, E

    2015-01-01

    Background and Objective: Knowledge management is introduced as a key element of quality improvement in organizations. There was no such research in university hospitals of Ahvaz. This study aimed to determine the association between the effectiveness of the processes of knowledge management and the health services quality from the managers’ view in the educational hospitals of Ahvaz city. Materials and Methods: in this correlational and research, the research population consisted of 120 managers from hospitals in University of Medical Sciences Ahvaz. Due to the limited population, the census was run. Three questionnaires were used for data collection: Demographic characteristics, the effectiveness of knowledge management processes and the quality of medical services. To analyze the data, the Spearman association analysis, The Kruskal-Wallis, the Mann–Whitney U test, were used in SPSS. Results: estimation of average scoring of the effectiveness of knowledge management processes and its components were relatively appropriate. Quality of medical services was estimated as relatively appropriate. Relationship of quality of health services with the effectiveness of knowledge management processes showed a medium and positive correlation (p < 0.001). Managers with different genders showed significant differences in knowledge development and transfer (P = 0.003). Conclusion: a significant and positive association was observed between the effectiveness of knowledge management processes and health care quality. To improve the health care quality in university hospitals, managers should pay more attention to develop the cultures of innovation, encourage teamwork, and improve communication and creative thinking in the knowledge management context PMID:28316735

  10. [Design of medical devices management system supporting full life-cycle process management].

    PubMed

    Su, Peng; Zhong, Jianping

    2014-03-01

    Based on the analysis of the present status of medical devices management, this paper optimized management process, developed a medical devices management system with Web technologies. With information technology to dynamic master the use of state of the entire life-cycle of medical devices. Through the closed-loop management with pre-event budget, mid-event control and after-event analysis, improved the delicacy management level of medical devices, optimized asset allocation, promoted positive operation of devices.

  11. Nurse manager cognitive decision-making amidst stress and work complexity.

    PubMed

    Shirey, Maria R; Ebright, Patricia R; McDaniel, Anna M

    2013-01-01

      The present study provides insight into nurse manager cognitive decision-making amidst stress and work complexity.   Little is known about nurse manager decision-making amidst stress and work complexity. Because nurse manager decisions have the potential to impact patient care quality and safety, understanding their decision-making processes is useful for designing supportive interventions.   This qualitative descriptive study interviewed 21 nurse managers from three hospitals to answer the research question: What decision-making processes do nurse managers utilize to address stressful situations in their nurse manager role? Face-to-face interviews incorporating components of the Critical Decision Method illuminated expert-novice practice differences. Content analysis identified one major theme and three sub-themes.   The present study produced a cognitive model that guides nurse manager decision-making related to stressful situations. Experience in the role, organizational context and situation factors influenced nurse manager cognitive decision-making processes.   Study findings suggest that chronic exposure to stress and work complexity negatively affects nurse manager health and their decision-making processes potentially threatening individual, patient and organizational outcomes.   Cognitive decision-making varies based on nurse manager experience and these differences have coaching and mentoring implications. This present study contributes a current understanding of nurse manager decision-making amidst stress and work complexity. © 2012 Blackwell Publishing Ltd.

  12. The Birth, Death, and Resurrection of an SPI Project

    NASA Astrophysics Data System (ADS)

    Carlsson, Sven; Schönström, Mikael

    Commentators on contemporary themes of strategic management and firm competitiveness stress that a firm's competitive advantage flows from its unique knowledge and how it manages knowledge, and for many firms their ability to create, share, exchange, and use knowledge have a major impact on their competitiveness (Nonaka & Teece 2001). In software development, knowledge management (KM) plays an increasingly important role. It has been argued that the KM-field is an important source for creating new perspectives on the software development process (Iivari 2000). Several Software Process Improvement (SPI) approaches stress the importance of managing knowledge and experiences as a way for improving software processes (Ahem et al. 2001). Another SPI-trend is the use of ideas from process management like in the Capability Maturity Model (CMM). Unfortunately, little research on the effects of the use of process management ideas in SPI exists. Given the influx of process management ideas to SPI, the impact of these ideas should be addressed.

  13. Managing Risk for Cassini During Mission Operations and Data Analysis (MOandDA)

    NASA Technical Reports Server (NTRS)

    Witkowski, Mona M.

    2002-01-01

    A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.

  14. Implementation of Integrated System Fault Management Capability

    NASA Technical Reports Server (NTRS)

    Figueroa, Fernando; Schmalzel, John; Morris, Jon; Smith, Harvey; Turowski, Mark

    2008-01-01

    Fault Management to support rocket engine test mission with highly reliable and accurate measurements; while improving availability and lifecycle costs. CORE ELEMENTS: Architecture, taxonomy, and ontology (ATO) for DIaK management. Intelligent Sensor Processes; Intelligent Element Processes; Intelligent Controllers; Intelligent Subsystem Processes; Intelligent System Processes; Intelligent Component Processes.

  15. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  16. Multimedia environmental management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soesilo, J.A.; Wiley, W.D.

    1999-09-01

    This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; andmore » environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.« less

  17. Integrated Work Management: Overview, Course 31881

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, Lewis Edward

    Integrated work management (IWM) is the process used for formally implementing the five-step process associated with integrated safety management (ISM) and integrated safeguards and security management (ISSM) at Los Alamos National Laboratory (LANL). IWM also directly supports the LANL Environmental Management System (EMS). IWM helps all workers and managers perform work safely and securely and in a manner that protects people, the environment, property, and the security of the nation. The IWM process applies to all work activities at LANL, from working in the office to designing experiments to assembling and detonating explosives. The primary LANL document that establishes andmore » describes IWM requirements is Procedure (P) 300, Integrated Work Management.« less

  18. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  19. 41 CFR 102-33.90 - What is the process for budgeting to acquire a Federal aircraft (including a Federal aircraft...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...

  20. 41 CFR 102-33.90 - What is the process for budgeting to acquire a Federal aircraft (including a Federal aircraft...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...

  1. 41 CFR 102-33.90 - What is the process for budgeting to acquire a Federal aircraft (including a Federal aircraft...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...

  2. 41 CFR 102-33.90 - What is the process for budgeting to acquire a Federal aircraft (including a Federal aircraft...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...

  3. 41 CFR 102-33.90 - What is the process for budgeting to acquire a Federal aircraft (including a Federal aircraft...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the process for... agency)? 102-33.90 Section 102-33.90 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF GOVERNMENT...

  4. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS FOREST SERVICE... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases...

  5. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS NATIONAL PARK... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases...

  6. Adaptive management for ecosystem services.

    PubMed

    Birgé, Hannah E; Allen, Craig R; Garmestani, Ahjond S; Pope, Kevin L

    2016-12-01

    Management of natural resources for the production of ecosystem services, which are vital for human well-being, is necessary even when there is uncertainty regarding system response to management action. This uncertainty is the result of incomplete controllability, complex internal feedbacks, and non-linearity that often interferes with desired management outcomes, and insufficient understanding of nature and people. Adaptive management was developed to reduce such uncertainty. We present a framework for the application of adaptive management for ecosystem services that explicitly accounts for cross-scale tradeoffs in the production of ecosystem services. Our framework focuses on identifying key spatiotemporal scales (plot, patch, ecosystem, landscape, and region) that encompass dominant structures and processes in the system, and includes within- and cross-scale dynamics, ecosystem service tradeoffs, and management controllability within and across scales. Resilience theory recognizes that a limited set of ecological processes in a given system regulate ecosystem services, yet our understanding of these processes is poorly understood. If management actions erode or remove these processes, the system may shift into an alternative state unlikely to support the production of desired services. Adaptive management provides a process to assess the underlying within and cross-scale tradeoffs associated with production of ecosystem services while proceeding with management designed to meet the demands of a growing human population. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. The why, what, and how of management innovation.

    PubMed

    Hamel, Gary

    2006-02-01

    For organizations like GE, P&G, and Visa, management innovation is the secret to success. But what is management innovation? Why is it so important? And how can other companies learn to become management innovators? This article from expert Gary Hamel answers those questions. A management breakthrough can deliver a strong advantage to the innovating company and produce a major shift in industry leadership. Few companies, however, have been able to come up with a formal process for fostering management innovation. The biggest challenge seems to be generating truly unique ideas. Four components can help: a big problem that demands fresh thinking, creative principles or paradigms that can reveal new approaches, an evaluation of the conventions that constrain novel thinking, and examples and analogies that help redefine what can be done. No doubt there are existing management processes in your organization that exacerbate the big problems you're hoping to solve. So how can you learn to identify them? Start by asking a series of questions for each one. For instance, Who owns the process? What are its objectives? What are the metrics for success? What are the decision-making criteria? How are decisions communicated, and to whom? After documenting these details, ask the people involved with the process to weigh in. This exploration may reveal opportunities to reinventyour management processes. A management innovation, the author says, creates long-lasting advantage when it meets at least one of three conditions: It is based on a novel principle that challenges the orthodoxy; it is systemic, involving a range of processes and methods; or it is part of a program of invention, where progress compounds over time. So far, management in this century isn't much different from management in the previous one, says Hamel. Therein lies the opportunity. You can wait for a competitor to come upon the next great management process and drive you out of business-or you can become a management innovator right now.

  8. An Information-Processing Model of Crisis Management.

    ERIC Educational Resources Information Center

    Egelhoff, William G.; Sen, Falguni

    1992-01-01

    Develops a contingency model for managing a variety of corporate crises. Views crisis management as an information-processing situation and organizations that must cope with crisis as information-processing systems. Attempts to fit appropriate information-processing mechanisms to different categories of crises. (PRA)

  9. Common Workflow Service: Standards Based Solution for Managing Operational Processes

    NASA Astrophysics Data System (ADS)

    Tinio, A. W.; Hollins, G. A.

    2017-06-01

    The Common Workflow Service is a collaborative and standards-based solution for managing mission operations processes using techniques from the Business Process Management (BPM) discipline. This presentation describes the CWS and its benefits.

  10. Adaptive management: The U.S. Department of the Interior technical guide

    USGS Publications Warehouse

    Williams, B K; Szaro, Robert C.; Shapiro, Carl D.

    2009-01-01

    The purpose of this technical guide is to present an operational definition of adaptive management, identify the conditions in which adaptive management should be considered, and describe the process of using adaptive management for managing natural resources. The guide is not an exhaustive discussion of adaptive management, nor does it include detailed specifications for individual projects. However, it should aid U.S. Department of the Interior (DOI) managers and practitioners in determining when and how to apply adaptive management. Adaptive management is framed within the context of structured decision making, with an emphasis on uncertainty about resource responses to management actions and the value of reducing that uncertainty to improve management. Though learning plays a key role in adaptive management, it is seen here as a means to an end, namely good management, and not an end in itself. The operational definition used in the guide is adopted from the National Research Council, which characterizes adaptive management as an iterative learning process producing improved understanding and improved management over time: Adaptive management [is a decision process that] promotes flexible decision making that can be adjusted in the face of uncertainties as outcomes from management actions and other events become better understood. Careful monitoring of these outcomes both advances scientific understanding and helps adjust policies or operations as part of an iterative learning process. Adaptive management also recognizes the importance of natural variability in contributing to ecological resilience and productivity. It is not a ‘trial and error’ process, but rather emphasizes learning while doing. Adaptive management does not represent an end in itself, but rather a means to more effective decisions and enhanced benefits. Its true measure is in how well it helps meet environmental, social, and economic goals, increases scientific knowledge, and reduces tensions among stakeholders. Adaptive management as defined here involves ongoing, real-time learning and knowledge creation, both in a substantive sense and in terms of the adaptive process itself. It is described in what follows in a series of 9 steps, as summarized in section 4.1, involving stakeholder involvement, management objectives, management alternatives, predictive models, monitoring plans, decision making, monitoring responses to management, assessment, and adjustment to management actions. An adaptive approach actively engages stakeholders in all phases of a project over its timeframe, facilitating mutual learning and reinforcing the commitment to learning-based management. Adaptive management in DOI is implemented within a legal context that includes statutory authorities such as the National Environmental Policy Act (NEPA), the Endangered Species Act, and the Federal Advisory Committee Act. For many important problems now facing the resource management community, adaptive management holds great promise in reducing the uncertainties that limit the effective management of natural resource systems. For many conservation and management problems, utilizing management itself in an experimental context may be the only feasible way to gain the system understanding needed to improve management. Though it is commonly thought that an adaptive approach can produce results quickly at low cost, the opposite is more likely to be true. An initial investment of time and effort will increase the likelihood of better decision making and resource stewardship in the future, but patience, flexibility, and support are needed over the life of an adaptive management project. For these reasons it is important to carefully consider the potential use of an adaptive approach, and to engage in careful planning and evaluation when adaptive management is used.

  11. Total Quality Management in a Knowledge Management Perspective.

    ERIC Educational Resources Information Center

    Johannsen, Carl Gustav

    2000-01-01

    Presents theoretical considerations on both similarities and differences between information management and knowledge management and presents a conceptual model of basic knowledge management processes. Discusses total quality management and quality control in the context of information management. (Author/LRW)

  12. 77 FR 62218 - Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Management 1. NMFS Report 2. Exempted Fishing Permit (EFP) Process 3. Pacific Sardine Stock Assessment and... Groundfish Management Process) 3. Progress Report on Using Descending Devices to Mitigate Barotrauma in... Fishery Management Council; Public Meetings AGENCY: National Marine Fisheries Service (NMFS), National...

  13. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  14. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  15. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  16. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  17. Conceptual framework for the mapping of management process with information technology in a business process.

    PubMed

    Rajarathinam, Vetrickarthick; Chellappa, Swarnalatha; Nagarajan, Asha

    2015-01-01

    This study on component framework reveals the importance of management process and technology mapping in a business environment. We defined ERP as a software tool, which has to provide business solution but not necessarily an integration of all the departments. Any business process can be classified as management process, operational process and the supportive process. We have gone through entire management process and were enable to bring influencing components to be mapped with a technology for a business solution. Governance, strategic management, and decision making are thoroughly discussed and the need of mapping these components with the ERP is clearly explained. Also we suggest that implementation of this framework might reduce the ERP failures and especially the ERP misfit was completely rectified.

  18. Conceptual Framework for the Mapping of Management Process with Information Technology in a Business Process

    PubMed Central

    Chellappa, Swarnalatha; Nagarajan, Asha

    2015-01-01

    This study on component framework reveals the importance of management process and technology mapping in a business environment. We defined ERP as a software tool, which has to provide business solution but not necessarily an integration of all the departments. Any business process can be classified as management process, operational process and the supportive process. We have gone through entire management process and were enable to bring influencing components to be mapped with a technology for a business solution. Governance, strategic management, and decision making are thoroughly discussed and the need of mapping these components with the ERP is clearly explained. Also we suggest that implementation of this framework might reduce the ERP failures and especially the ERP misfit was completely rectified. PMID:25861688

  19. Understanding the challenges to implementing case management for people with dementia in primary care in England: a qualitative study using Normalization Process Theory.

    PubMed

    Bamford, Claire; Poole, Marie; Brittain, Katie; Chew-Graham, Carolyn; Fox, Chris; Iliffe, Steve; Manthorpe, Jill; Robinson, Louise

    2014-11-08

    Case management has been suggested as a way of improving the quality and cost-effectiveness of support for people with dementia. In this study we adapted and implemented a successful United States' model of case management in primary care in England. The results are reported elsewhere, but a key finding was that little case management took place. This paper reports the findings of the process evaluation which used Normalization Process Theory to understand the barriers to implementation. Ethnographic methods were used to explore the views and experiences of case management. Interviews with 49 stakeholders (patients, carers, case managers, health and social care professionals) were supplemented with observation of case managers during meetings and initial assessments with patients. Transcripts and field notes were analysed initially using the constant comparative approach and emerging themes were then mapped onto the framework of Normalization Process Theory. The primary focus during implementation was on the case managers as isolated individuals, with little attention being paid to the social or organizational context within which they worked. Barriers relating to each of the four main constructs of Normalization Process Theory were identified, with a lack of clarity over the scope and boundaries of the intervention (coherence); variable investment in the intervention (cognitive participation); a lack of resources, skills and training to deliver case management (collective action); and limited reflection and feedback on the case manager role (reflexive monitoring). Despite the intuitive appeal of case management to all stakeholders, there were multiple barriers to implementation in primary care in England including: difficulties in embedding case managers within existing well-established community networks; the challenges of protecting time for case management; and case managers' inability to identify, and act on, emerging patient and carer needs (an essential, but previously unrecognised, training need). In the light of these barriers it is unclear whether primary care is the most appropriate setting for case management in England. The process evaluation highlights key aspects of implementation and training to be addressed in future studies of case management for dementia.

  20. 41 CFR 102-193.25 - What type of records management business process improvements should my agency strive to achieve?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What type of records management business process improvements should my agency strive to achieve? 102-193.25 Section 102-193.25...-193.25 What type of records management business process improvements should my agency strive to...

  1. 41 CFR 102-193.25 - What type of records management business process improvements should my agency strive to achieve?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What type of records management business process improvements should my agency strive to achieve? 102-193.25 Section 102-193.25...-193.25 What type of records management business process improvements should my agency strive to...

  2. 41 CFR 102-193.25 - What type of records management business process improvements should my agency strive to achieve?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What type of records management business process improvements should my agency strive to achieve? 102-193.25 Section 102-193.25...-193.25 What type of records management business process improvements should my agency strive to...

  3. 41 CFR 102-193.25 - What type of records management business process improvements should my agency strive to achieve?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What type of records management business process improvements should my agency strive to achieve? 102-193.25 Section 102-193.25...-193.25 What type of records management business process improvements should my agency strive to...

  4. A Process Model of Small Business Owner-Managers' Learning in Peer Networks

    ERIC Educational Resources Information Center

    Zhang, Jing; Hamilton, Eleanor

    2009-01-01

    Purpose: The purpose of this study is to explore how owner-managers of small businesses can learn in peer networks to improve their management skills. It aims to offer a new way of understanding owner-managers' learning as part of a social process, by highlighting the complex, interactive relationship that exists between the owner-manager, his or…

  5. Attaining and maintaining data integrity with configuration management

    NASA Astrophysics Data System (ADS)

    Huffman, Dorothy J.; Jeane, Shirley A.

    1993-08-01

    Managers and scientists are concerned about data integrity because they draw conclusions from data that can have far reaching effects. Projects managers use Configuration Management to insure that hardware, software, and project information are controlled. They have not, as yet, applied its rigorously to data. However, there is ample opportunity in the data collection and production process to jeopardize data integrity. Environmental changes, tampering and production problems can all affect data integrity. There are four functions included in the Configuration Management process: configuration identification, control, auditing and status accounting. These functions provide management the means to attain data integrity and the visibility into engineering processes needed to maintain data integrity. When project managers apply Configuration Management processes to data, the data user can trace back through history to validate data integrity. The user knows that the project allowed only orderly changes to the data. He is assured that project personnel followed procedures to maintain data quality. He also has access to status information about the data. The user receives data products with a known integrity level and a means to assess the impact of past events ont he conclusions derived from the data. To obtain these benefits, project managers should apply the Configuration Management discipline to data.

  6. An architecture for heuristic control of real-time processes

    NASA Technical Reports Server (NTRS)

    Raulefs, P.; Thorndyke, P. W.

    1987-01-01

    Abstract Process management combines complementary approaches of heuristic reasoning and analytical process control. Management of a continuous process requires monitoring the environment and the controlled system, assessing the ongoing situation, developing and revising planned actions, and controlling the execution of the actions. For knowledge-intensive domains, process management entails the potentially time-stressed cooperation among a variety of expert systems. By redesigning a blackboard control architecture in an object-oriented framework, researchers obtain an approach to process management that considerably extends blackboard control mechanisms and overcomes limitations of blackboard systems.

  7. Introduction to School Business Management.

    ERIC Educational Resources Information Center

    Miles, F. Mike

    This chapter of "Principles of School Business Management" reviews the historical development of the school business management process and the role, responsibilities, and training of the administrators assigned to carry out the process. The origins of school management in colonial America and the subsequent growth and increasing…

  8. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  9. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  10. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  11. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  12. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and a USA technician examine cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and a USA technician examine cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  13. Application fields for the new Object Management Group (OMG) Standards Case Management Model and Notation (CMMN) and Decision Management Notation (DMN) in the perioperative field.

    PubMed

    Wiemuth, M; Junger, D; Leitritz, M A; Neumann, J; Neumuth, T; Burgert, O

    2017-08-01

    Medical processes can be modeled using different methods and notations. Currently used modeling systems like Business Process Model and Notation (BPMN) are not capable of describing the highly flexible and variable medical processes in sufficient detail. We combined two modeling systems, Business Process Management (BPM) and Adaptive Case Management (ACM), to be able to model non-deterministic medical processes. We used the new Standards Case Management Model and Notation (CMMN) and Decision Management Notation (DMN). First, we explain how CMMN, DMN and BPMN could be used to model non-deterministic medical processes. We applied this methodology to model 79 cataract operations provided by University Hospital Leipzig, Germany, and four cataract operations provided by University Eye Hospital Tuebingen, Germany. Our model consists of 85 tasks and about 20 decisions in BPMN. We were able to expand the system with more complex situations that might appear during an intervention. An effective modeling of the cataract intervention is possible using the combination of BPM and ACM. The combination gives the possibility to depict complex processes with complex decisions. This combination allows a significant advantage for modeling perioperative processes.

  14. Adaptive harvest management of North American waterfowl populations: a brief history and future prospects

    USGS Publications Warehouse

    Nichols, J.D.; Runge, M.C.; Johnson, F.A.; Williams, B.K.

    2007-01-01

    Since 1995, the US Fish and Wildlife Service has used an adaptive approach to the management of sport harvest of mid-continent Mallard ducks (Anas platyrhynchos) in North America. This approach differs from many current approaches to conservation and management in requiring close collaboration between managers and scientists. Key elements of this process are objectives, alternative management actions, models permitting prediction of system responses, and a monitoring program. The iterative process produces optimal management decisions and leads to reduction in uncertainty about response of populations to management. This general approach to management has a number of desirable features and is recommended for use in many other programs of management and conservation.

  15. Reputation Management in Children on the Autism Spectrum.

    PubMed

    Cage, Eilidh; Bird, Geoffrey; Pellicano, Elizabeth

    2016-12-01

    Being able to manage reputation is an important social skill, but it is unclear whether autistic children can manage reputation. This study investigated whether 33 autistic children matched to 33 typical children could implicitly or explicitly manage reputation. Further, we examined whether cognitive processes-theory of mind, social motivation, inhibitory control and reciprocity-contribute to reputation management. Results showed that neither group implicitly managed reputation, and there was no group difference in explicit reputation management. Results suggested different mechanisms contribute to reputation management in these groups-social motivation in typical children and reciprocity in autistic children. Explicit reputation management is achievable for autistic children, and there are individual differences in its relationship to underlying cognitive processes.

  16. A ten-step process to develop case management plans.

    PubMed

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  17. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of public... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  18. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION: Notice of publication. SUMMARY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk...

  19. A Process Management System for Networked Manufacturing

    NASA Astrophysics Data System (ADS)

    Liu, Tingting; Wang, Huifen; Liu, Linyan

    With the development of computer, communication and network, networked manufacturing has become one of the main manufacturing paradigms in the 21st century. Under the networked manufacturing environment, there exist a large number of cooperative tasks susceptible to alterations, conflicts caused by resources and problems of cost and quality. This increases the complexity of administration. Process management is a technology used to design, enact, control, and analyze networked manufacturing processes. It supports efficient execution, effective management, conflict resolution, cost containment and quality control. In this paper we propose an integrated process management system for networked manufacturing. Requirements of process management are analyzed and architecture of the system is presented. And a process model considering process cost and quality is developed. Finally a case study is provided to explain how the system runs efficiently.

  20. [Methodology for construction of a panel of indicators for monitoring and evaluation of unified health system (SUS) management].

    PubMed

    Tamaki, Edson Mamoru; Tanaka, Oswaldo Yoshimi; Felisberto, Eronildo; Alves, Cinthia Kalyne de Almeida; Drumond Junior, Marcos; Bezerra, Luciana Caroline de Albuquerque; Calvo, Maria Cristina Marino; Miranda, Alcides Silva de

    2012-04-01

    This study sought to develop methodology for the construction of a Panel for the Monitoring and Evaluation of Management of the Unified Health System (SUS). The participative process used in addition to the systematization conducted made it possible to identify an effective strategy for building management tools in partnership with researchers, academic institutions and managers of the SUS. The final systematization of the Panel selected indicators for the management of the SUS in terms of Demand, Inputs, Processes, Outputs and Outcomes in order to provide a simple, versatile and useful tool for evaluation at any level of management and more transparent and easier communication with all stakeholders in decision-making. Taking the management of the SUS as the scope of these processes and practices in all normative aspects enabled dialog between systemic theories and those which consider the centrality of the social actor in the decision-making process.

  1. How patients with gout become engaged in disease management: a constructivist grounded theory study.

    PubMed

    Howren, Alyssa; Cox, Susan M; Shojania, Kam; Rai, Sharan K; Choi, Hyon K; De Vera, Mary A

    2018-06-01

    Prior qualitative research on gout has focused primarily on barriers to disease management. Our objective was to use patients' perspectives to construct an explanatory framework to understand how patients become engaged in the management of their gout. We recruited a sample of individuals with gout who were participating in a proof-of-concept study of an eHealth-supported collaborative care model for gout involving rheumatology, pharmacy, and dietetics. Semistructured interviews were used. We analyzed transcripts using principles of constructivist grounded theory involving initial coding, focused coding and categorizing, and theoretical coding. Twelve participants with gout (ten males, two females; mean age, 66.5 ± 13.3 years) were interviewed. The analysis resulted in the construction of three themes as well as a framework describing the dynamically linked themes on (1) processing the diagnosis and management of gout, (2) supporting management of gout, and (3) interfering with management of gout. In this framework, patients with gout transition between each theme in the process of becoming engaged in the management of their gout and may represent potential opportunities for healthcare intervention. Findings derived from this study show that becoming engaged in gout management is a dynamic process whereby patients with gout experience factors that interfere with gout management, process their disease and its management, and develop the practical and perceptual skills necessary to manage their gout. By understanding this process, healthcare providers can identify points to adapt care delivery and thereby improve health outcomes.

  2. Knowledge Management Orientation: An Innovative Perspective to Hospital Management.

    PubMed

    Ghasemi, Matina; Ghadiri Nejad, Mazyar; Bagzibagli, Kemal

    2017-12-01

    By considering innovation as a new project in hospitals, all the project management's standard steps should be followed in execution. This study investigated the validation of a new set of measures in terms of providing a procedure for knowledge management-oriented innovation that enriches the hospital management system. The relation between innovation and all the knowledge management areas, as the main constructs of project management, was illustrated by referring to project management standard steps and previous studies. Through consultations and meetings with a committee of professional project managers, a questionnaire was developed to measure ten knowledge management areas in hospital's innovation process. Additionally, a group of experts from hospital managers were invited to comment on the applicability of the questionnaires by considering if the items are measurable in hospitals practically. A close-ended, Likert-type scale items, consisted of ten sections, were developed based on project management body of knowledge thorough Delphi technique. It enables the managers to evaluate hospitals' situation to be aware whether the organization follows the knowledge management standards in innovation process or not. By pilot study, confirmatory factor analysis and exploratory factor analysis were conducted to ensure the validity and reliability of the measurement items. The developed items seem to have a potential to help hospital managers and subsequently delivering new products/services successfully based on the standard procedures in their organization. In all innovation processes, the knowledge management areas and their standard steps help hospital managers by a new tool as questionnaire format.

  3. Attitudes towards disability management: A survey of employees returning to work and their supervisors.

    PubMed

    Busse, Jason W; Dolinschi, Roman; Clarke, Andrew; Scott, Liz; Hogg-Johnson, Sheilah; Amick, Benjamin C; Rivilis, Irina; Cole, Donald

    2011-01-01

    Return to work after a leave on disability is a common phenomenon, but little is known about the attitudes of employees or their supervisors towards the disability management process. We report on employee and supervisor feedback from one disability management experience. 389 consecutive employees from the Ontario offices of a single private Canadian insurance company returning to work from short-term disability, and their supervisors. We surveyed employees and their supervisors about their experience with, and attitudes towards, the disability management process. Of those surveyed, 88 employees and 75 supervisors provided data (response rates of 22.6% and 19.3% respectively). The majority of respondents (79.1% of employees and supervisors) endorsed positive attitudes towards their disability management experience. More than 25% of employees disagreed with the following three items: case managers contributed to recovery, case managers removed barriers to recovery, and sufficient support was provided in the return to work process. More than 25% of employees and managers reported that a commitment to modify an unhelpful work situation was not followed through. The majority of participating employees returning to work from short-term disability, and their supervisors, reported a high level of satisfaction with the disability management process. Areas that may benefit from attention include some aspects of case manager-employee interaction and ensuring that support during the return to work process is provided, including modification to work situations when appropriate.

  4. Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure.

    PubMed

    Mickelson, Robin S; Unertl, Kim M; Holden, Richard J

    2016-10-12

    Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. We identified 5 high-level macrocognitive processes affecting medication management-sensemaking, planning, coordination, monitoring, and decision making-and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation.

  5. Testing Components of a Self-Management Theory in Adolescents With Type 1 Diabetes Mellitus.

    PubMed

    Verchota, Gwen; Sawin, Kathleen J

    The role of self-management in adolescents with type 1 diabetes mellitus is not well understood. The purpose of the research was to examine the relationship of key individual and family self-management theory, context, and process variables on proximal (self-management behaviors) and distal (hemoglobin A1c and diabetes-specific health-related quality of life) outcomes in adolescents with type 1 diabetes. A correlational, cross-sectional study was conducted to identify factors contributing to outcomes in adolescents with Type 1 diabetes and examine potential relationships between context, process, and outcome variables delineated in individual and family self-management theory. Participants were 103 adolescent-parent dyads (adolescents ages 12-17) with Type 1 diabetes from a Midwest, outpatient, diabetes clinic. The dyads completed a self-report survey including instruments intended to measure context, process, and outcome variables from individual and family self-management theory. Using hierarchical multiple regression, context (depressive symptoms) and process (communication) variables explained 37% of the variance in self-management behaviors. Regimen complexity-the only significant predictor-explained 11% of the variance in hemoglobin A1c. Neither process variables nor self-management behaviors were significant. For the diabetes-specific health-related quality of life outcome, context (regimen complexity and depressive symptoms) explained 26% of the variance at step 1; an additional 9% of the variance was explained when process (self-efficacy and communication) variables were added at step 2; and 52% of the variance was explained when self-management behaviors were added at Step 3. In the final model, three variables were significant predictors: depressive symptoms, self-efficacy, and self-management behaviors. The individual and family self-management theory can serve as a cogent theory for understanding key concepts, processes, and outcomes essential to self-management in adolescents and families dealing with Type 1 diabetes mellitus.

  6. Total Quality Management Implementation Plan: Defense Depot, Ogden

    DTIC Science & Technology

    1989-07-01

    NUMBERS Total Quality Management Implementation Plan Defense Depot Ogden 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...PAGES TQM (Total Quality Management ), Continuous Process Improvement, Depot Operations, Process Action Teams 16. PRICE CODE 17. SECURITY...034 A Message From The Commander On Total Quality Management i fully support the DLA aoproacii to Total Quality Management . As stated by General

  7. Project management process.

    DOT National Transportation Integrated Search

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  8. [Meanings attributed to management as an explanation for clinician managers' attitudes and professional identity].

    PubMed

    Cascón-Pereira, Rosalía; Valverde, Mireia

    2014-01-01

    To understand the process by which clinician managers construct their professional identities and develop their attitudes toward managing. A qualitative study was performed, based on grounded theory, through in-depth interviews with 20 clinician managers selected through theoretical sampling in two public hospitals of Catalonia (Spain), participant observation, and documentation. Clinician managers' role meanings are constructed by comparing their roles with those of senior managers and clinicians. In this process, clinician managers seek to differentiate themselves from senior managers through the meanings constructed. In particular, they use proximity with reality and clinical knowledge as the main sources of differentiation. This study sheds light on why clinician managers develop adverse attitudes to managing and why they define themselves as clinicians rather than as managers. The explanation lies in the construction of the meanings they assign to managing as the basis of their attitudes to this role and professional identity. These findings have some practical implications for healthcare management. Copyright © 2014. Published by Elsevier Espana.

  9. The clinical nurse specialist as resuscitation process manager.

    PubMed

    Schneiderhahn, Mary Elizabeth; Fish, Anne Folta

    2014-01-01

    The purpose of this article was to describe the history and leadership dimensions of the role of resuscitation process manager and provide specific examples of how this role is implemented at a Midwest medical center. In 1992, a medical center in the Midwest needed a nurse to manage resuscitation care. This role designation meant that this nurse became central to all quality improvement efforts in resuscitation care. The role expanded as clinical resuscitation guidelines were updated and as the medical center grew. The role became known as the critical care clinical nurse specialist as resuscitation process manager. This clinical care nurse specialist was called a manager, but she had no direct line authority, so she accomplished her objectives by forming a multitude of collaborative networks. Based on a framework by Finkelman, the manager role incorporated specific leadership abilities in quality improvement: (1) coordination of medical center-wide resuscitation, (2) use of interprofessional teams, (3) integration of evidence into practice, and (4) staff coaching to develop leadership. The manager coordinates resuscitation care with the goals of prevention of arrests if possible, efficient and effective implementation of resuscitation protocols, high quality of patient and family support during and after the resuscitation event, and creation or revision of resuscitation policies for in-hospital and for ambulatory care areas. The manager designs a comprehensive set of meaningful and measurable process and outcome indicators with input from interprofessional teams. The manager engages staff in learning, reflecting on care given, and using the evidence base for resuscitation care. Finally, the manager role is a balance between leading quality improvement efforts and coaching staff to implement and sustain these quality improvement initiatives. Revisions to clinical guidelines for resuscitation care since the 1990s have resulted in medical centers developing improved resuscitation processes that require management. The manager enhances collaborative quality improvement efforts that are in line with Institute of Medicine recommendations. The role of resuscitation process manager may be of interest to medical centers striving for excellence in evidence-based resuscitation care.

  10. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach.

    PubMed

    Bai, Libiao; Wang, Hailing; Huang, Ning; Du, Qiang; Huang, Youdan

    2018-06-23

    The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP) based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP) environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP)-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  11. Optimizing the discovery organization for innovation.

    PubMed

    Sams-Dodd, Frank

    2005-08-01

    Strategic management is the process of adapting organizational structure and management principles to fit the strategic goal of the business unit. The pharmaceutical industry has generally been expert at optimizing its organizations for drug development, but has rarely implemented different structures for the early discovery process, where the objective is innovation and the transformation of innovation into drug projects. Here, a set of strategic management methods is proposed, covering team composition, organizational structure, management principles and portfolio management, which are designed to increase the level of innovation in the early drug discovery process.

  12. 41 CFR 101-26.506-4 - Acceptance and processing of requests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Acceptance and processing of requests. 101-26.506-4 Section 101-26.506-4 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26...

  13. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  14. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  15. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  16. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  17. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  18. Case management information systems: how to put the pieces together now and beyond year 2000.

    PubMed

    Matthews, Pamela

    2002-01-01

    The case management process is a critical management and operational component in the delivery of customer services across the patient care continuum. Case management has transcended time and will continue to be a viable infrastructure process for successful organizations in the future. A key component of the case management infrastructure is information systems and technology support. Case management challenges include effective deployment and use of systems and technology. As more sophisticated, integrated systems are made available, case managers can use these tools to continue to expand effectively beyond the patient's episodic event to provide greater levels of cradle-to-grave management of healthcare. This article explores methods for defining case management system needs and identifying automation options available to the case manager.

  19. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  20. Total Quality Management (TQM): Training Module on "Focus on Processes."

    ERIC Educational Resources Information Center

    Leigh, David

    This module for a 1-semester Total Quality Management (TQM) course for high school or community college students contains a brief overview of the definition of processes, a section on process flow diagrams, and a section on process management as well as a description of process variation. Examples are used throughout the module to make processes…

  1. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...

  2. Research on the Intensive Material Management System of Biomass Power Plant

    NASA Astrophysics Data System (ADS)

    Zhang, Ruosi; Hao, Tianyi; Li, Yunxiao; Zhang, Fangqing; Ding, Sheng

    2017-05-01

    In view of the universal problem which the material management is loose, and lack of standardization and interactive real-time in the biomass power plant, a system based on the method of intensive management is proposed in this paper to control the whole process of power plant material. By analysing the whole process of power plant material management and applying the Internet of Things, the method can simplify the management process. By making use of the resources to maximize and data mining, material utilization, circulation rate and quality control management can be improved. The system has been applied in Gaotang power plant, which raised the level of materials management and economic effectiveness greatly. It has an important significance for safe, cost-effective and highly efficient operation of the plant.

  3. The cost management organization: the next step for materiel management.

    PubMed

    Schuweiler, R C

    1997-06-01

    With Materiel Management's transition over the last decade from simple logistics to analysis and cost management, it has gained recognition as a key part of the management team responsible for supplies, equipment, standards, and associated processes to identify, purchase, store, distribute, issue, and dispose of supplies and equipment. The materiel manager's job consists of putting the right product in the right place at the right time and in the right quantity at the best total delivered cost. In this context, Materiel Management has made powerful impacts to lower costs associated with: Distribution--costs have been lowered by actively adopting advanced supply channel management techniques such as primary suppliers, JIT, stockless programs, case cart/custom kit/procedure based delivery systems, modified stockless programs as well as margin management through cost plus, flat fee, or margins paid per activity. Cost of goods--lowered through aggregated purchasing in the forms of regional and national purchasing alliances and local capitation or other gain/risk share programs. Internal process costs--lowered by out-sourcing and/or integrating supplier processes and personnel into operations via partnership approaches. We have also reduced transactional costs through EDI transaction sets and the emerging use of the inter and intranet/electronic commerce, procurement cards, and evaluated receipt settlement processes. De-layering--We have lowered the operating costs of Materiel Management overhead by re-design/re-engineering, resulting in reduced management and greater front line authority. Quality--We have learned to identify and respond to customer and supplier needs by using quality improvement tools and ongoing measurement and monitoring techniques. Through this we have identified the waste of non-beneficial products and services. We have adopted supplier certification measurers to ensure quality is built into processes and outcomes. With so much already accomplished, it should be easy to rest on these laurels and simply operate. However, we believe that this is just a beginning. A new generation of highly educated leaders are emerging and taking advantage of the contributions of pioneers who laid the ground work. These new leaders will have advanced management, statistics, and behavioral sciences skills. They will be analysts and organizational motivators. Their goal will be to improve financial and clinical performance measured by real time process and performance data. The new leaders will have information at their fingertips thanks to significant leaps forward in data collection, automated continuous replenishment processes, and software designed for better management of clinical and cost outcomes. This article documents significant Materiel management accomplishments and conceptualizes cost management processes. The cost management organization is the logical evolution in our efforts for better outcomes in healthcare Materiel management.

  4. 76 FR 57723 - Electricity Sector Cybersecurity Risk Management Process Guideline

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... DEPARTMENT OF ENERGY Electricity Sector Cybersecurity Risk Management Process Guideline AGENCY... public comment on DOE's intent to publish the Electricity Sector Cybersecurity Risk Management Process... electricity sector organizations and adds to the body of resources that help refine the definition and...

  5. US EPA Base Study Standard Operating Procedure for Data Processing and Data Management

    EPA Pesticide Factsheets

    The purpose of the Standard Operating Procedures (SOP) for data management and data processing is to facilitate consistent documentation and completion of data processing duties and management responsibilities in order to maintain a high standard of data quality.

  6. Information systems for material flow management in construction processes

    NASA Astrophysics Data System (ADS)

    Mesároš, P.; Mandičák, T.

    2015-01-01

    The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.

  7. Assessment of Army Contracting Command’s Contract Management Processes (TACOM and RDECOM)

    DTIC Science & Technology

    2011-04-01

    Management Processes (TACOM and RDECOM)” was prepared for and funded by the Acquisition Program, Graduate School of Business & Public Policy, Naval...system and the Evolved Expendable Launch Vehicle rocket program. Rendon has taught contract management courses for the UCLA Government Contracts...program; he was also a senior faculty member for the Keller Graduate School of Management, where he taught MBA courses in project management and

  8. Participative management in health care services.

    PubMed

    Muller, M

    1995-03-01

    The need and demand for the highest-quality management of all health care delivery activities requires a participative management approach. The purpose with this article is to explore the process of participative management, to generate and describe a model for such management, focusing mainly on the process of participative management, and to formulate guidelines for operationalization of the procedure. An exploratory, descriptive and theory-generating research design is pursued. After a brief literature review, inductive reasoning is mainly employed to identify and define central concepts, followed by the formulation of a few applicable statements and guidelines. Participative management is viewed as a process of that constitutes the elements of dynamic interactive decision-making and problem-solving, shared governance, empowerment, organisational transformation, and dynamic communication within the health care organisation. The scientific method of assessment, planning, implementation and evaluation is utilised throughout the process of participative management. A continuum of interactive decision-making and problem-solving is described, the different role-players involved, as well as the levels of interactive decision-making and problem-solving. The most appropriate decision-making strategy should be employed in pro-active and reactive decision-making. Applicable principles and assumptions in each element of participative management is described. It is recommended that this proposed model for participative management be refined by means of a literature control, interactive dialogue with experts and a model case description or participative management, to ensure the trustworthiness of this research.

  9. Pain management: a review of organisation models with integrated processes for the management of pain in adult cancer patients.

    PubMed

    Brink-Huis, Anita; van Achterberg, Theo; Schoonhoven, Lisette

    2008-08-01

    This paper reports a review of the literature conducted to identify organisation models in cancer pain management that contain integrated care processes and describe their effectiveness. Pain is experienced by 30-50% of cancer patients receiving treatment and by 70-90% of those with advanced disease. Efforts to improve pain management have been made through the development and dissemination of clinical guidelines. Early improvements in pain management were focussed on just one or two single processes such as pain assessment and patient education. Little is known about organisational models with multiple integrated processes throughout the course of the disease trajectory and concerning all stages of the care process. Systematic review. The review involved a systematic search of the literature, published between 1986-2006. Subject-specific keywords used to describe patients, disease, pain management interventions and integrated care processes, relevant for this review were selected using the thesaurus of the databases. Institutional models, clinical pathways and consultation services are three alternative models for the integration of care processes in cancer pain management. A clinical pathway is a comprehensive institutionalisation model, whereas a pain consultation service is a 'stand-alone' model that can be integrated in a clinical pathway. Positive patient and process outcomes have been described for all three models, although the level of evidence is generally low. Evaluation of the quality of pain management must involve standardised measurements of both patient and process outcomes. We recommend the development of policies for referrals to a pain consultation service. These policies can be integrated within a clinical pathway. To evaluate the effectiveness of pain management models standardised outcome measures are needed.

  10. Science in the public process of ecosystem management: lessons from Hawaii, Southeast Asia, Africa and the US Mainland.

    PubMed

    Gutrich, John; Donovan, Deanna; Finucane, Melissa; Focht, Will; Hitzhusen, Fred; Manopimoke, Supachit; McCauley, David; Norton, Bryan; Sabatier, Paul; Salzman, Jim; Sasmitawidjaja, Virza

    2005-08-01

    Partnerships and co-operative environmental management are increasing worldwide as is the call for scientific input in the public process of ecosystem management. In Hawaii, private landowners, non-governmental organizations, and state and federal agencies have formed watershed partnerships to conserve and better manage upland forested watersheds. In this paper, findings of an international workshop convened in Hawaii to explore the strengths of approaches used to assess stakeholder values of environmental resources and foster consensus in the public process of ecosystem management are presented. Authors draw upon field experience in projects throughout Hawaii, Southeast Asia, Africa and the US mainland to derive a set of lessons learned that can be applied to Hawaiian and other watershed partnerships in an effort to promote consensus and sustainable ecosystem management. Interdisciplinary science-based models can serve as effective tools to identify areas of potential consensus in the process of ecosystem management. Effective integration of scientific input in co-operative ecosystem management depends on the role of science, the stakeholders and decision-makers involved, and the common language utilized to compare tradeoffs. Trust is essential to consensus building and the integration of scientific input must be transparent and inclusive of public feedback. Consideration of all relevant stakeholders and the actual benefits and costs of management activities to each stakeholder is essential. Perceptions and intuitive responses of people can be as influential as analytical processes in decision-making and must be addressed. Deliberative, dynamic and iterative decision-making processes all influence the level of stakeholder achievement of consensus. In Hawaii, application of lessons learned can promote more informed and democratic decision processes, quality scientific analysis that is relevant, and legitimacy and public acceptance of ecosystem management.

  11. Structured decision making as a framework for large-scale wildlife harvest management decisions

    USGS Publications Warehouse

    Robinson, Kelly F.; Fuller, Angela K.; Hurst, Jeremy E.; Swift, Bryan L.; Kirsch, Arthur; Farquhar, James F.; Decker, Daniel J.; Siemer, William F.

    2016-01-01

    Fish and wildlife harvest management at large spatial scales often involves making complex decisions with multiple objectives and difficult tradeoffs, population demographics that vary spatially, competing stakeholder values, and uncertainties that might affect management decisions. Structured decision making (SDM) provides a formal decision analytic framework for evaluating difficult decisions by breaking decisions into component parts and separating the values of stakeholders from the scientific evaluation of management actions and uncertainty. The result is a rigorous, transparent, and values-driven process. This decision-aiding process provides the decision maker with a more complete understanding of the problem and the effects of potential management actions on stakeholder values, as well as how key uncertainties can affect the decision. We use a case study to illustrate how SDM can be used as a decision-aiding tool for management decision making at large scales. We evaluated alternative white-tailed deer (Odocoileus virginianus) buck-harvest regulations in New York designed to reduce harvest of yearling bucks, taking into consideration the values of the state wildlife agency responsible for managing deer, as well as deer hunters. We incorporated tradeoffs about social, ecological, and economic management concerns throughout the state. Based on the outcomes of predictive models, expert elicitation, and hunter surveys, the SDM process identified management alternatives that optimized competing objectives. The SDM process provided biologists and managers insight about aspects of the buck-harvest decision that helped them adopt a management strategy most compatible with diverse hunter values and management concerns.

  12. The research and realization of digital management platform for ultra-precision optical elements within life-cycle

    NASA Astrophysics Data System (ADS)

    Wang, Juan; Wang, Jian; Li, Lijuan; Zhou, Kun

    2014-08-01

    In order to solve the information fusion, process integration, collaborative design and manufacturing for ultra-precision optical elements within life-cycle management, this paper presents a digital management platform which is based on product data and business processes by adopting the modern manufacturing technique, information technique and modern management technique. The architecture and system integration of the digital management platform are discussed in this paper. The digital management platform can realize information sharing and interaction for information-flow, control-flow and value-stream from user's needs to offline in life-cycle, and it can also enhance process control, collaborative research and service ability of ultra-precision optical elements.

  13. Managing clinical integration in integrated delivery systems: a framework for action.

    PubMed

    Young, D W; Barrett, D

    1997-01-01

    An integrated delivery system (IDS) in healthcare must coordinate patient care across multiple functions, activities, and operating units. To achieve this clinical integration, senior management confronts many challenges. This paper uses a cross-functional-process (CFP) framework to discuss these challenges. There are ten CFPs that fall into three categories: planning processes (strategy formulation, program adaptation, budget formulation), organizational processes (authority and influence, client management, conflict resolution, motivation, and cultural maintenance), and measurement and reporting processes (financial and programmatic). Each process typically spans several functional units. Senior management must consider how to improve both the functioning of each CFP, as well as its "fit" with the other nine. The result can be greater clinical integration, improved cost management, and more coordinated care for enrollees.

  14. Engaging stakeholders for adaptive management using structured decision analysis

    USGS Publications Warehouse

    Irwin, Elise R.; Kathryn, D.; Kennedy, Mickett

    2009-01-01

    Adaptive management is different from other types of management in that it includes all stakeholders (versus only policy makers) in the process, uses resource optimization techniques to evaluate competing objectives, and recognizes and attempts to reduce uncertainty inherent in natural resource systems. Management actions are negotiated by stakeholders, monitored results are compared to predictions of how the system should respond, and management strategies are adjusted in a “monitor-compare-adjust” iterative routine. Many adaptive management projects fail because of the lack of stakeholder identification, engagement, and continued involvement. Primary reasons for this vary but are usually related to either stakeholders not having ownership (or representation) in decision processes or disenfranchisement of stakeholders after adaptive management begins. We present an example in which stakeholders participated fully in adaptive management of a southeastern regulated river. Structured decision analysis was used to define management objectives and stakeholder values and to determine initial flow prescriptions. The process was transparent, and the visual nature of the modeling software allowed stakeholders to see how their interests and values were represented in the decision process. The development of a stakeholder governance structure and communication mechanism has been critical to the success of the project.

  15. Risk-Informed Decision Making: Application to Technology Development Alternative Selection

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon; Maggio, Gaspare; Everett, Christopher

    2010-01-01

    NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

  16. Optimization and standardization of pavement management processes.

    DOT National Transportation Integrated Search

    2004-08-01

    This report addresses issues related to optimization and standardization of current pavement management processes in Kentucky. Historical pavement management records were analyzed, which indicates that standardization is necessary in future pavement ...

  17. Managing for resilience

    EPA Science Inventory

    Early efforts in wildlife management focused on reducing population variability and maximizing yields of select species. Aldo Leopold proposed the concept of habitat management as superior to population management. More recently, ecosystem management, whereby ecological processes...

  18. A support architecture for reliable distributed computing systems

    NASA Technical Reports Server (NTRS)

    Mckendry, Martin S.

    1986-01-01

    The Clouds kernel design was through several design phases and is nearly complete. The object manager, the process manager, the storage manager, the communications manager, and the actions manager are examined.

  19. The potential of disease management for neuromuscular hereditary disorders.

    PubMed

    Chouinard, Maud-Christine; Gagnon, Cynthia; Laberge, Luc; Tremblay, Carmen; Côté, Charlotte; Leclerc, Nadine; Mathieu, Jean

    2009-01-01

    Neuromuscular hereditary disorders require long-term multidisciplinary rehabilitation management. Although the need for coordinated healthcare management has long been recognized, most neuromuscular disorders are still lacking clinical guidelines about their long-term management and structured evaluation plan with associated services. One of the most prevalent adult-onset neuromuscular disorders, myotonic dystrophy type 1, generally presents several comorbidities and a variable clinical picture, making management a constant challenge. This article presents a healthcare follow-up plan and proposes a nursing case management within a disease management program as an innovative and promising approach. This disease management program and model consists of eight components including population identification processes, evidence-based practice guidelines, collaborative practice, patient self-management education, and process outcomes evaluation (Disease Management Association of America, 2004). It is believed to have the potential to significantly improve healthcare management for neuromuscular hereditary disorders and will prove useful to nurses delivering and organizing services for this population.

  20. KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 1, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (right) are briefed by a USA technician (center) on Shuttle processing in the payload bay of orbiter Atlantis. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 1, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (right) are briefed by a USA technician (center) on Shuttle processing in the payload bay of orbiter Atlantis. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  1. Electronic Handbooks Simplify Process Management

    NASA Technical Reports Server (NTRS)

    2012-01-01

    Getting a multitude of people to work together to manage processes across many organizations for example, flight projects, research, technologies, or data centers and others is not an easy task. Just ask Dr. Barry E. Jacobs, a research computer scientist at Goddard Space Flight Center. He helped NASA develop a process management solution that provided documenting tools for process developers and participants to help them quickly learn, adapt, test, and teach their views. Some of these tools included editable files for subprocess descriptions, document descriptions, role guidelines, manager worksheets, and references. First utilized for NASA's Headquarters Directives Management process, the approach led to the invention of a concept called the Electronic Handbook (EHB). This EHB concept was successfully applied to NASA's Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs, among other NASA programs. Several Federal agencies showed interest in the concept, so Jacobs and his team visited these agencies to show them how their specific processes could be managed by the methodology, as well as to create mockup versions of the EHBs.

  2. Assessing and managing multiple risks in a changing world ...

    EPA Pesticide Factsheets

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk—Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological c

  3. Assessing and Managing Multiple Risks in a Changing World ...

    EPA Pesticide Factsheets

    Roskilde University hosted a November 2015 workshop on “Environmental Risk – Assessing and Managing Multiple Risks in a Changing World”. Thirty attendees from 9 countries developed consensus recommendations regarding: implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process involving both universal and site-, region-, or problem-specific protection goals; addressing societal issues; risk management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. We encourage both cross- and inter-disciplinary approaches to address 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and non-chemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk assessment process; 4) fully integrate risk assessors and communities of interest into the risk management process; 5) consider socio-economics and increase transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference con

  4. Diffusion of Policy Discourse into Rural Spheres Through Co-Management of State Forestlands: Two Cases from West Java, Indonesia

    NASA Astrophysics Data System (ADS)

    Kubo, Hideyuki

    2008-07-01

    In the context of state forestland management in tropical regions, the implementation of a co-management approach has been widely advocated in order to include the voices of local people and accommodate their interests in management decision-making. Most co-management literatures, however, underestimate the significance of statutory authority held by state to control forestlands and resources. By clarifying the implications of state ownership of forestland, this article aims to critically examine co-management processes with reference to Foucault’s notion of power and subject. Case studies were conducted at two co-management pilot sites in Gunung Halimun-Salak National Park, West Java, Indonesia. Findings demonstrate that co-management processes actually materialize shared decision-making arrangements between state forest bureaucracy and rural people through the application of equity approaches, such as deliberation, negotiation, and experimentation. At the same time, these processes can also function to diffuse state policy discourse in rural spheres, which makes rural subjects who accept and practice the policy discourse. The research also reveals that the diffusion process is complex and does not necessarily make a durable subject unless they are pertinently organized. The results of this research indicate that co-management of state forestlands is a double-edged process for local people who risk becoming a proxy of state bureaucracy in the implementation of state policy. Proponents of co-management should, therefore, critically examine whether new institutional arrangements, which are developed through co-management, truly reflect values and needs of local people and assist them to develop a pertinent subject to deal with it.

  5. Manager`s views of public involvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Branch, K.M.; Heerwagen, J.; Bradbury, J.

    1995-12-01

    Four issues commonly form the framework for debates about the acceptability of proposed projects or technologies--the substantive decision or technological choice; the treatment of the community by the proponent organization; the way the decision-making process has been structured and managed; and the status of institutional safeguards and protection. One of the clear messages of cultural theory is that differences in perspectives are a normal and inevitable part of society, and that attempts to resolve differences by persuasion are not likely to work. These findings are useful when considering the goals and possibilities of public involvement as a decision-making tool, andmore » when designing or evaluating public involvement training programs for managers. The research reported here examines the viewpoints and concerns of managers and decision-makers about the four issues identified above, with particular emphasis on their perspectives and concerns about opening decision-making processes to the public and about managers` roles and responsibilities for structuring and managing open decision-making processes. Implications of these findings for public involvement training for managers is also discussed. The data presented in this paper were obtained from face-to-face interviews with managers and decision-makers with experience managing a variety of hazardous waste management decision-making processes. We conducted these interviews in the course of four separate research projects: needs assessments to support the design and development of a public involvement training program for managers; a study of community residents` and managers` perspectives on the chemical stockpile disposal program; an evaluation of the effectiveness of public involvement training for managers in the Department of Energy; and a study to develop indicators of the benefits and costs of public involvement.« less

  6. An integrated operational definition and conceptual model of asthma self-management in teens.

    PubMed

    Mammen, Jennifer; Rhee, Hyekyun; Norton, Sally A; Butz, Arlene M; Halterman, Jill S; Arcoleo, Kimberly

    2018-01-19

    A previous definition of adolescent asthma self-management was derived from interviews with clinicians/researchers and published literature; however, it did not incorporate perspectives of teens or parents. Therefore, we conducted in-depth interviews with teens and parents and synthesized present findings with the prior analysis to develop a more encompassing definition and model. Focal concepts were qualitatively extracted from 14-day self-management voice-diaries (n = 14) and 1-hour interviews (n = 42) with teens and parents (28 individuals) along with concepts found in the previous clinical/research oriented analysis. Conceptual structure and relationships were identified and key findings synthesized to develop a revised definition and model of adolescent asthma self-management. There were two primary self-management constructs: processes of self-management and tasks of self-management. Self-management was defined as the iterative process of assessing, deciding, and responding to specific situations in order to achieve personally important outcomes. Clinically relevant asthma self-management tasks included monitoring asthma, managing active issues through pharmacologic and non-pharmacologic strategies, preventing future issues, and communicating with others as needed. Self-management processes were reciprocally influenced by intrapersonal factors (both cognitive and physical), interpersonal factors (family, social and physical environments), and personally relevant asthma and non-asthma outcomes. This is the first definition of asthma self-management incorporating teen, parent, clinician, and researcher perspectives, which suggests that self-management processes and behaviors are influenced by individually variable personal and interpersonal factors, and are driven by personally important outcomes. Clinicians and researchers should investigate teens' symptom perceptions, medication beliefs, current approaches to symptom management, relevant outcomes, and personal priorities.

  7. Management Challenges Fiscal Year 2016

    DTIC Science & Technology

    2017-01-01

    of Office of Inspector General Management Challenges 14 │ FY 2016 classified information revealed “methods to our adversaries that could impact our...electronic data to perform operations and to process, maintain, and report essential information . Office of Inspector General Management ...that collects, processes, stores, disseminates, and manages critical information . It includes owned and leased communications and computing

  8. 44 CFR 204.22 - Submitting a request for a fire management assistance declaration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.22 Submitting a request for a fire management assistance.... To ensure that we can process a State's request for a fire management assistance declaration as... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Submitting a request for a...

  9. 44 CFR 204.22 - Submitting a request for a fire management assistance declaration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.22 Submitting a request for a fire management assistance.... To ensure that we can process a State's request for a fire management assistance declaration as... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Submitting a request for a...

  10. 44 CFR 204.22 - Submitting a request for a fire management assistance declaration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.22 Submitting a request for a fire management assistance.... To ensure that we can process a State's request for a fire management assistance declaration as... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Submitting a request for a...

  11. 44 CFR 204.22 - Submitting a request for a fire management assistance declaration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.22 Submitting a request for a fire management assistance.... To ensure that we can process a State's request for a fire management assistance declaration as... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Submitting a request for a...

  12. 44 CFR 204.22 - Submitting a request for a fire management assistance declaration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.22 Submitting a request for a fire management assistance.... To ensure that we can process a State's request for a fire management assistance declaration as... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Submitting a request for a...

  13. A Curriculum of Value Creation and Management in Engineering

    ERIC Educational Resources Information Center

    Yannou, Bernard; Bigand, Michel

    2004-01-01

    As teachers and researchers belonging to two sister French engineering schools, we are convinced that the processes of value creation and management are essential in today's teaching of industrial engineering and project managers. We believe that such processes may be embedded in a three-part curriculum composed of value management and innovation…

  14. Visual management system and timber management application

    Treesearch

    Warren R. Bacon; Asa D. (Bud) Twombly

    1979-01-01

    This paper includes an illustration of a planning process to guide vegetation management throughout a travel route seen area and over the time period of a total management rotation (100-300 years). The process will produce direction on visual characteristics to be created and maintained within the biological potential and coordinated with associated re-source...

  15. The Design and Management of an Organisation's Lifelong Learning Curriculum

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2009-01-01

    Purpose: The purpose of this paper is to examine the successful design and management of high performance work-based lifelong learning processes. Design: The paper summarises the process management practices and contextual parameters that are being applied in the successful design and management of high performance work based lifelong learning…

  16. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  17. 78 FR 15931 - Sunshine Act Meeting; Request for Comments on Draft Evaluation of Recommended Practice on Fatigue...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Evaluation of Recommended Practice on Fatigue Risk Management Systems for Personnel in the Refining and... and Health Administration: 2001-05-I-DE-1 (Process Safety Management coverage of atmospheric storage tanks); 2005-04-I-TX-9 (Process Safety Management requirement for organizational management of change...

  18. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  19. KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician briefs NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, USA Vice President and Space Shuttle Program Manager Howard DeCastro, and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik on the use of cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician briefs NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, USA Vice President and Space Shuttle Program Manager Howard DeCastro, and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik on the use of cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  20. Coordinating cancer care: patient and practice management processes among surgeons who treat breast cancer.

    PubMed

    Katz, Steven J; Hawley, Sarah T; Morrow, Monica; Griggs, Jennifer J; Jagsi, Reshma; Hamilton, Ann S; Graff, John J; Friese, Christopher R; Hofer, Timothy P

    2010-01-01

    The Institute of Medicine has called for more coordinated cancer care models that correspond to initiatives led by cancer providers and professional organizations. These initiatives parallel those underway to integrate the management of patients with chronic conditions. We developed 5 breast cancer patient and practice management process measures based on the Chronic Care Model. We then performed a survey to evaluate patterns and correlates of these measures among attending surgeons of a population-based sample of patients diagnosed with breast cancer between June 2005 and February 2007 in Los Angeles and Detroit (N = 312; response rate, 75.9%). Surgeon practice specialization varied markedly with about half of the surgeons devoting 15% or less of their total practice to breast cancer, whereas 16.2% of surgeons devoted 50% or more. There was also large variation in the extent of the use of patient and practice management processes with most surgeons reporting low use. Patient and practice management process measures were positively associated with greater levels of surgeon specialization and the presence of a teaching program. Cancer program status was weakly associated with patient and practice management processes. Low uptake of patient and practice management processes among surgeons who treat breast cancer patients may indicate that surgeons are not convinced that these processes matter, or that there are logistical and cost barriers to implementation. More research is needed to understand how large variations in patient and practice management processes might affect the quality of care for patients with breast cancer.

  1. Managing frame diversity in environmental participatory processes - Example from the Fogera woreda in Ethiopia.

    PubMed

    Hassenforder, Emeline; Brugnach, Marcela; Cullen, Beth; Ferrand, Nils; Barreteau, Olivier; Daniell, Katherine Anne; Pittock, Jamie

    2016-07-15

    Many participatory processes fail to generate social change and collaborative outcomes. This failure can partly be explained by how divergent stakeholders' frames are handled. This paper builds on the framing and participation literature to explain how facilitators can manage frame diversity and foster collaborative outcomes. It suggests two pragmatic steps: identifying frames and managing frames. The two steps are applied to a participatory process for natural resource management in Fogera, Ethiopia. Effectiveness of facilitators' strategies to manage frame diversity in the Fogera case is discussed. Two main elements challenging effectiveness are identified: counter-strategies used by facilitators and most-powerful stakeholders, and the constraining factors knowledge, champions and frame sponsorship. We argue that these elements need to be taken into account by participatory process facilitators when managing frame diversity. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Protocol and practice in the adaptive management of waterfowl harvests

    USGS Publications Warehouse

    Johnson, F.; Williams, K.

    1999-01-01

    Waterfowl harvest management in North America, for all its success, historically has had several shortcomings, including a lack of well-defined objectives, a failure to account for uncertain management outcomes, and inefficient use of harvest regulations to understand the effects of management. To address these and other concerns, the U.S. Fish and Wildlife Service began implementation of adaptive harvest management in 1995. Harvest policies are now developed using a Markov decision process in which there is an explicit accounting for uncontrolled environmental variation, partial controllability of harvest, and structural uncertainty in waterfowl population dynamics. Current policies are passively adaptive, in the sense that any reduction in structural uncertainty is an unplanned by-product of the regulatory process. A generalization of the Markov decision process permits the calculation of optimal actively adaptive policies, but it is not yet clear how state-specific harvest actions differ between passive and active approaches. The Markov decision process also provides managers the ability to explore optimal levels of aggregation or "management scale" for regulating harvests in a system that exhibits high temporal, spatial, and organizational variability. Progress in institutionalizing adaptive harvest management has been remarkable, but some managers still perceive the process as a panacea, while failing to appreciate the challenges presented by this more explicit and methodical approach to harvest regulation. Technical hurdles include the need to develop better linkages between population processes and the dynamics of landscapes, and to model the dynamics of structural uncertainty in a more comprehensive fashion. From an institutional perspective, agreement on how to value and allocate harvests continues to be elusive, and there is some evidence that waterfowl managers have overestimated the importance of achievement-oriented factors in setting hunting regulations. Indeed, it is these unresolved value judgements, and the lack of an effective structure for organizing debate, that present the greatest threat to adaptive harvest management as a viable means for coping with management uncertainty. Copyright ?? 1999 by The Resilience Alliance.

  3. Reengineering outcomes management: an integrated approach to managing data, systems, and processes.

    PubMed

    Neuman, K; Malloch, K; Ruetten, V

    1999-01-01

    The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.

  4. A management, leadership, and board road map to transforming care for patients.

    PubMed

    Toussaint, John

    2013-01-01

    Over the last decade I have studied 115 healthcare organizations in II countries, examining them from the boardroom to the patient bedside. In that time, I have observed one critical element missing from just about every facility: a set of standards that could reliably produce zero-defect care for patients. This lack of standards is largely rooted in the Sloan management approach, a top-down management and leadership structure that is void of standardized accountability. This article offers an alternative approach: management by process--an operating system that engages frontline staff in decisions and imposes standards and processes on the act of managing. Organizations that have adopted management by process have seen quality improve and costs decrease because the people closest to the work are expected to identify problems and solve them. Also detailed are the leadership behaviors required for an organization to successfully implement the management-by-process operating system and the board of trustees' role in supporting the transformation.

  5. Evaluating the effects of ecosystem management: a case study in a Missouri Ozark forest

    Treesearch

    Wendy K. Gram; Victoria L. Sork; Robert J. Marquis; Rochelle B. Renken; Richard L. Clawson; et. al.

    2002-01-01

    Many federal and state management agencies have shifted from commodity-based management systems to multiple resource-based management systems that emphasize sustainable ecosystem management. Long-term sustainability of ecosystem functions and processes is at the core of ecosystem management, but a blueprint for assessing sustainability under different management...

  6. Medication Management: The Macrocognitive Workflow of Older Adults With Heart Failure

    PubMed Central

    2016-01-01

    Background Older adults with chronic disease struggle to manage complex medication regimens. Health information technology has the potential to improve medication management, but only if it is based on a thorough understanding of the complexity of medication management workflow as it occurs in natural settings. Prior research reveals that patient work related to medication management is complex, cognitive, and collaborative. Macrocognitive processes are theorized as how people individually and collaboratively think in complex, adaptive, and messy nonlaboratory settings supported by artifacts. Objective The objective of this research was to describe and analyze the work of medication management by older adults with heart failure, using a macrocognitive workflow framework. Methods We interviewed and observed 61 older patients along with 30 informal caregivers about self-care practices including medication management. Descriptive qualitative content analysis methods were used to develop categories, subcategories, and themes about macrocognitive processes used in medication management workflow. Results We identified 5 high-level macrocognitive processes affecting medication management—sensemaking, planning, coordination, monitoring, and decision making—and 15 subprocesses. Data revealed workflow as occurring in a highly collaborative, fragile system of interacting people, artifacts, time, and space. Process breakdowns were common and patients had little support for macrocognitive workflow from current tools. Conclusions Macrocognitive processes affected medication management performance. Describing and analyzing this performance produced recommendations for technology supporting collaboration and sensemaking, decision making and problem detection, and planning and implementation. PMID:27733331

  7. Knowledge Management Orientation: An Innovative Perspective to Hospital Management

    PubMed Central

    GHASEMI, Matina; GHADIRI NEJAD, Mazyar; BAGZIBAGLI, Kemal

    2017-01-01

    Background: By considering innovation as a new project in hospitals, all the project management’s standard steps should be followed in execution. This study investigated the validation of a new set of measures in terms of providing a procedure for knowledge management-oriented innovation that enriches the hospital management system. Methods: The relation between innovation and all the knowledge management areas, as the main constructs of project management, was illustrated by referring to project management standard steps and previous studies. Through consultations and meetings with a committee of professional project managers, a questionnaire was developed to measure ten knowledge management areas in hospital’s innovation process. Additionally, a group of experts from hospital managers were invited to comment on the applicability of the questionnaires by considering if the items are measurable in hospitals practically. Results: A close-ended, Likert-type scale items, consisted of ten sections, were developed based on project management body of knowledge thorough Delphi technique. It enables the managers to evaluate hospitals’ situation to be aware whether the organization follows the knowledge management standards in innovation process or not. By pilot study, confirmatory factor analysis and exploratory factor analysis were conducted to ensure the validity and reliability of the measurement items. Conclusion: The developed items seem to have a potential to help hospital managers and subsequently delivering new products/services successfully based on the standard procedures in their organization. In all innovation processes, the knowledge management areas and their standard steps help hospital managers by a new tool as questionnaire format. PMID:29259938

  8. Risk Management Structured for Today's Environment

    NASA Technical Reports Server (NTRS)

    Greenfield, Michael A.

    1998-01-01

    In NPG (NASA Procedures and Guidelines) 7120.5A, we define risk management as "an organized, systematic decision-making process that efficiently identifies, analyzes, plans, tracks, controls, and communicates and documents risk in order to increase the likelihood of achieving program/project goals." Effective risk management depends upon a thorough understanding of the concept of risk, the principles of risk management and the formation of a disciplined risk management process. In human spaceflight programs, NASA has always maintained a rigorous and highly structured risk management effort. When lives are at stake, NASA's missions must be 100% safe; the risk management approach used in human spaceflight has always been comprehensive.

  9. [Development of whole process quality control and management system of traditional Chinese medicine decoction pieces based on traditional Chinese medicine quality tree].

    PubMed

    Yu, Wen-Kang; Dong, Ling; Pei, Wen-Xuan; Sun, Zhi-Rong; Dai, Jun-Dong; Wang, Yun

    2017-12-01

    The whole process quality control and management of traditional Chinese medicine (TCM) decoction pieces is a system engineering, involving the base environment, seeds and seedlings, harvesting, processing and other multiple steps, so the accurate identification of factors in TCM production process that may induce the quality risk, as well as reasonable quality control measures are very important. At present, the concept of quality risk is mainly concentrated in the aspects of management and regulations, etc. There is no comprehensive analysis on possible risks in the quality control process of TCM decoction pieces, or analysis summary of effective quality control schemes. A whole process quality control and management system for TCM decoction pieces based on TCM quality tree was proposed in this study. This system effectively combined the process analysis method of TCM quality tree with the quality risk management, and can help managers to make real-time decisions while realizing the whole process quality control of TCM. By providing personalized web interface, this system can realize user-oriented information feedback, and was convenient for users to predict, evaluate and control the quality of TCM. In the application process, the whole process quality control and management system of the TCM decoction pieces can identify the related quality factors such as base environment, cultivation and pieces processing, extend and modify the existing scientific workflow according to their own production conditions, and provide different enterprises with their own quality systems, to achieve the personalized service. As a new quality management model, this paper can provide reference for improving the quality of Chinese medicine production and quality standardization. Copyright© by the Chinese Pharmaceutical Association.

  10. 44 CFR 204.21 - Fire management assistance declaration criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Declaration Process § 204.21 Fire management assistance declaration criteria. (a) Determinations. We will... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Fire management assistance declaration criteria. 204.21 Section 204.21 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT...

  11. 44 CFR 204.21 - Fire management assistance declaration criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Declaration Process § 204.21 Fire management assistance declaration criteria. (a) Determinations. We will... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Fire management assistance declaration criteria. 204.21 Section 204.21 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT...

  12. 44 CFR 204.21 - Fire management assistance declaration criteria.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Declaration Process § 204.21 Fire management assistance declaration criteria. (a) Determinations. We will... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Fire management assistance declaration criteria. 204.21 Section 204.21 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT...

  13. 44 CFR 204.21 - Fire management assistance declaration criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Declaration Process § 204.21 Fire management assistance declaration criteria. (a) Determinations. We will... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Fire management assistance declaration criteria. 204.21 Section 204.21 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT...

  14. 44 CFR 204.21 - Fire management assistance declaration criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Declaration Process § 204.21 Fire management assistance declaration criteria. (a) Determinations. We will... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Fire management assistance declaration criteria. 204.21 Section 204.21 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT...

  15. An Investigation on the Competences of School Managers in Managing the Emotions of Teachers

    ERIC Educational Resources Information Center

    Helvaci, Mehmet Akif; Takmak, Hazal

    2016-01-01

    The emotion management of others is among the new competences of school managers. Therefore, the purpose of this study is to determine the Competences of Managing the Emotions of Teachers by School Managers in terms of management processes according to the viewpoints of teachers and managers. The questionnaire was administrated to 261 teachers and…

  16. General overview of the disaster management framework in Cameroon.

    PubMed

    Bang, Henry Ngenyam

    2014-07-01

    Efficient and effective disaster management will prevent many hazardous events from becoming disasters. This paper constitutes the most comprehensive document on the natural disaster management framework of Cameroon. It reviews critically disaster management in Cameroon, examining the various legislative, institutional, and administrative frameworks that help to facilitate the process. Furthermore, it illuminates the vital role that disaster managers at the national, regional, and local level play to ease the process. Using empirical data, the study analyses the efficiency and effectiveness of the actions of disaster managers. Its findings reveal inadequate disaster management policies, poor coordination between disaster management institutions at the national level, the lack of trained disaster managers, a skewed disaster management system, and a top-down hierarchical structure within Cameroon's disaster management framework. By scrutinising the disaster management framework of the country, policy recommendations based on the research findings are made on the institutional and administrative frameworks. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  17. [The balanced scorecard used as a management tool in a clinical laboratory: internal business processes indicators].

    PubMed

    Salinas La Casta, Maria; Flores Pardo, Emilio; Uris Selles, Joaquín

    2009-01-01

    to propose a set of indicators as a management tool for a clinical laboratory, by using the balanced scorecard internal business processes perspective. indicators proposed are obtained from different sources; external proficiency testing of the Valencia Community Government, by means of internal surveys and laboratory information system registers. One year testing process proportion indicators results are showed. internal management indicators are proposed (process, appropriateness and proficiency testing). The process indicators results show gradual improvement since its establishment. after one years of using a conceptually solid Balanced Scorecard Internal business processes perspective indicators, the obtained results validate the usefulness as a laboratory management tool.

  18. 78 FR 4478 - Federal Employees Dental and Vision Insurance Program: Application Process for Contract Awards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... OFFICE OF PERSONNEL MANAGEMENT Federal Employees Dental and Vision Insurance Program: Application Process for Contract Awards AGENCY: U.S. Office of Personnel Management. ACTION: Notice of Application.... Office of Personnel Management (OPM) is changing its contract awards process from a full solicitation to...

  19. Process for Managing and Customizing HPC Operating Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, David ML

    2014-04-02

    A process for maintaining a custom HPC operating system was developed at the Environmental Molecular Sciences Laboratory (EMSL) over the past ten years. This process is generic and flexible to manage continuous change as well as keep systems updated while managing communication through well defined pieces of software.

  20. Hydogeomorphic Processes in Mountainous Terrain: Effects of Land Management and Implications for Sustainability and Hazards

    EPA Science Inventory

    The evolving science of hydrogeomorphology encompasses the interaction of water with landforms in time and space. This includes the processes of surface and mass erosion as well as the effects of land management. These hydrogeomorphic processes and management effects are examined...

  1. Configuration Management Policy

    EPA Pesticide Factsheets

    This Policy establishes an Agency-wide Configuration Management Program and to provide responsibilities, compliance requirements, and overall principles for Configuration and Change Management processes to support information technology management.

  2. A leadership-management training curriculum for pathology residents.

    PubMed

    Sims, K L; Darcy, T P

    1997-07-01

    Leadership and management skills are increasingly critical to the success of pathologists in and outside of academic centers. We describe a leadership and management curriculum in a combined anatomic and clinical pathology residency program. The mentor-based approach incorporates leadership and management skills throughout the residency with a dedicated 2-month rotation during the final year of training. This 2-month rotation is led by a senior faculty pathologist mentor and includes active participation in management activities, small group discussions, reading, and a management process project. The topics for the small group discussions, reading list, mentor-based activities, and completed management process projects are described. Outcomes and evaluations are reported for residents who have completed this curriculum in leadership and management.

  3. Factors influencing exacerbation-related self-management in patients with COPD: a qualitative study.

    PubMed

    Korpershoek, Yjg; Vervoort, Scjm; Nijssen, Lit; Trappenburg, Jca; Schuurmans, M J

    2016-01-01

    In patients with COPD, self-management skills are important to reduce the impact of exacerbations. However, both detection and adequate response to exacerbations appear to be difficult for some patients. Little is known about the underlying process of exacerbation-related self-management. Therefore, the objective of this study was to identify and explain the underlying process of exacerbation-related self-management behavior. A qualitative study using semi-structured in-depth interviews was performed according to the grounded theory approach, following a cyclic process in which data collection and data analysis alternated. Fifteen patients (male n=8; age range 59-88 years) with mild to very severe COPD were recruited from primary and secondary care settings in the Netherlands, in 2015. Several patterns in exacerbation-related self-management behavior were identified, and a conceptual model describing factors influencing exacerbation-related self-management was developed. Acceptance, knowledge, experiences with exacerbations, perceived severity of symptoms and social support were important factors influencing exacerbation-related self-management. Specific factors influencing recognition of exacerbations were heterogeneity of exacerbations and habituation to symptoms. Feelings of fear, perceived influence on exacerbation course, patient beliefs, ambivalence toward treatment, trust in health care providers and self-empowerment were identified as specific factors influencing self-management actions. This study provided insight into factors influencing exacerbation-related self-management behavior in COPD patients. The conceptual model can be used as a framework for health care professionals providing self-management support. In the development of future self-management interventions, factors influencing the process of exacerbation-related self-management should be taken into account.

  4. Impression Management in Survey Responding: Easier for Collectivists or Individualists?

    PubMed

    Riemer, Hila; Shavitt, Sharon

    2011-04-01

    Three experiments indicate that when individualists and collectivists engage in impression management on self-reports, they do so through different psychological mechanism s. Collectivists do so through a relatively automatic process. Thus, they can impression manage even when cognitively busy. Individualists impression manage through a more effortful process. Therefore, they can do so only when the situation permits effortful processing. These findings highlight distinct conditions under which social norms may influence consumer self-reports across cultures.

  5. Enabling Healthcare IT Governance: Human Task Management Service for Administering Emergency Department's Resources for Efficient Patient Flow.

    PubMed

    Rodriguez, Salvador; Aziz, Ayesha; Chatwin, Chris

    2014-01-01

    The use of Health Information Technology (HIT) to improve healthcare service delivery is constantly increasing due to research advances in medical science and information systems. Having a fully automated process solution for a Healthcare Organization (HCO) requires a combination of organizational strategies along with a selection of technologies that facilitate the goal of improving clinical outcomes. HCOs, requires dynamic management of care capability to realize the full potential of HIT. Business Process Management (BPM) is being increasingly adopted to streamline the healthcare service delivery and management processes. Emergency Departments (EDs) provide a case in point, which require multidisciplinary resources and services to deliver effective clinical outcomes. Managed care involves the coordination of a range of services in an ED. Although fully automated processes in emergency care provide a cutting edge example of service delivery, there are many situations that require human interactions with the computerized systems; e.g. Medication Approvals, care transfer, acute patient care. This requires a coordination mechanism for all the resources, computer and human, to work side by side to provide the best care. To ensure evidence-based medical practice in ED, we have designed a Human Task Management service to model the process of coordination of ED resources based on the UK's NICE Clinical guideline for managing the care of acutely ill patients. This functionality is implemented using Java Business process Management (jBPM).

  6. Report: EPA Managers Did Not Hold Supervisors and Project Officers Accountable for Grants Management

    EPA Pesticide Factsheets

    Report #2005-P-00027, September 27, 2005. Managers did not sufficiently hold supervisors and project officers accountable for grants management because there is no process to measure most grants management activity.

  7. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  8. How do line managers experience and handle the return to work of employees on sick leave due to work-related stress? A one-year follow-up study.

    PubMed

    Ladegaard, Yun; Skakon, Janne; Elrond, Andreas Friis; Netterstrøm, Bo

    2017-08-28

    To examine how line managers experience and manage the return to work process of employees on sick leave due to work-related stress and to identify supportive and inhibiting factors. Semi-structured interviews with 15 line managers who have had employees on sick leave due to work-related stress. The grounded theory approach was employed. Even though managers may accept the overall concept of work-related stress, they focus on personality and individual circumstances when an employee is sick-listed due to work-related stress. The lack of a common understanding of stress creates room for this focus. Line managers experience cross-pressure, discrepancies between strategic and human-relationship perspectives and a lack of organizational support in the return to work process. Organizations should aim to provide support for line managers. Research-based knowledge and guidelines on work-related stress and return to work process are essential, as is the involvement of coworkers. A commonly accepted definition of stress and a systematic risk assessment is also important. Cross-pressure on line managers should be minimized and room for adequate preventive actions should be provided as such an approach could support both the return to work process and the implementation of important interventions in the work environment. Implication for rehabilitation Organizations should aim to provide support for line managers handling the return to work process. Cross-pressure on line managers should be minimized and adequate preventive actions should be provided in relation to the return to work process. Research-based knowledge and guidelines on work-related stress and return to work are essential. A common and formal definition of stress should be emphasized in the workplace.

  9. Are we measuring what matters in health technology assessment of disease management? Systematic literature review.

    PubMed

    Steuten, Lotte; Vrijhoef, Bert; Severens, Hans; van Merode, Frits; Spreeuwenberg, Cor

    2006-01-01

    An overview was produced of indicators currently used to assess disease management programs and, based on these findings, provide a framework regarding sets of indicators that should be used when taking the aims and types of disease management programs into account. A systematic literature review was performed. Thirty-six studies met the inclusion criteria. It appeared that a link between aims of disease management and evaluated structure, process, as well as outcome indicators does not exist in a substantial part of published studies on disease management of diabetes and asthma/chronic obstructive pulmonary disease, especially when efficiency of care is concerned. Furthermore, structure indicators are largely missing from the evaluations, although these are of major importance for the interpretation of outcomes for purposes of decision-making. Efficiency of disease management is mainly evaluated by means of process indicators; the use of outcome indicators is less common. Within a framework, structure, process, and outcome indicators for effectiveness and efficiency are recommended for each type of disease management program. The link between aims of disease management and evaluated structure, process, and outcome indicators does not exist in a substantial part of published studies on disease management. The added value of this study mainly lies in the development of a framework to guide the choice of indicators for health technology assessment of disease management.

  10. [Medical record management and risk management processes. State of the art and new normative guidelines about the organization and the management of the sanitary documentation in the National Health System or Hospital Trusts].

    PubMed

    Spolaore, P; Murolo, G; Sommavilla, M

    2003-01-01

    Recent health care reforms, the start of accreditation processes of health institutions, and the introduction also in the health system of risk management concepts and instruments, borrowed from the enterprise culture and the emphasis put on the protection of privacy, render evident the need and the urgency to define and to implement improvement processes of the organization and management of the medical documentation in the hospital with the aim of facilitation in fulfilment of regional and local health authorities policies about protection of the safety and improvement of quality of care. Currently the normative context that disciplines the management of medical records inside the hospital appears somewhat fragmentary, incomplete and however not able to clearly orientate health operators with the aim of a correct application of the enforced norms in the respect of the interests of the user and of local health authority. In this job we individuate the critical steps in the various phases of management process of the clinical folder and propose a new model of regulations, with the purpose to improve and to simplify the management processes and the modalities of compilation, conservation and release to entitled people of all clinical documentation.

  11. Going from "paper and pen" to ICT systems: Perspectives on managing the change process.

    PubMed

    Andersson Marchesoni, Maria; Axelsson, Karin; Fältholm, Ylva; Lindberg, Inger

    2017-03-01

    Lack of participation from staff when developing information and communication technologies (ICT) has been shown to lead to negative consequences and might be one explanation for failure. Management during development processes has rarely been empirically studied, especially when introducing ICT systems in a municipality context. To describe and interpret experiences of the management during change processes where ICT was introduced among staff and managers in elderly care. A qualitative interpretive method was chosen for this study and content analysis for analyzing the interviews. "Clear focus-unclear process" demonstrated that focus on ICT solutions was clear but the process of introducing the ICT was not. "First-line managers receiving a system of support" gave a picture of the first-line manager as not playing an active part in the projects. First-line managers and staff described "Low power to influence" when realizing that for some reasons, they had not contributed in the change projects. "Low confirmation" represented the previous and present feelings of staff not being listened to. Lastly, "Reciprocal understanding" pictures how first-line managers and staff, although having some expectations on each other, understood each other's positions. Empowerment could be useful in creating an organization where critical awareness and reflection over daily practice becomes a routine.

  12. [Process orientation as a tool of strategic approaches to corporate governance and integrated management systems].

    PubMed

    Sens, Brigitte

    2010-01-01

    The concept of general process orientation as an instrument of organisation development is the core principle of quality management philosophy, i.e. the learning organisation. Accordingly, prestigious quality awards and certification systems focus on process configuration and continual improvement. In German health care organisations, particularly in hospitals, this general process orientation has not been widely implemented yet - despite enormous change dynamics and the requirements of both quality and economic efficiency of health care processes. But based on a consistent process architecture that considers key processes as well as management and support processes, the strategy of excellent health service provision including quality, safety and transparency can be realised in daily operative work. The core elements of quality (e.g., evidence-based medicine), patient safety and risk management, environmental management, health and safety at work can be embedded in daily health care processes as an integrated management system (the "all in one system" principle). Sustainable advantages and benefits for patients, staff, and the organisation will result: stable, high-quality, efficient, and indicator-based health care processes. Hospitals with their broad variety of complex health care procedures should now exploit the full potential of total process orientation. Copyright © 2010. Published by Elsevier GmbH.

  13. Workflow management systems in radiology

    NASA Astrophysics Data System (ADS)

    Wendler, Thomas; Meetz, Kirsten; Schmidt, Joachim

    1998-07-01

    In a situation of shrinking health care budgets, increasing cost pressure and growing demands to increase the efficiency and the quality of medical services, health care enterprises are forced to optimize or complete re-design their processes. Although information technology is agreed to potentially contribute to cost reduction and efficiency improvement, the real success factors are the re-definition and automation of processes: Business Process Re-engineering and Workflow Management. In this paper we discuss architectures for the use of workflow management systems in radiology. We propose to move forward from information systems in radiology (RIS, PACS) to Radiology Management Systems, in which workflow functionality (process definitions and process automation) is implemented through autonomous workflow management systems (WfMS). In a workflow oriented architecture, an autonomous workflow enactment service communicates with workflow client applications via standardized interfaces. In this paper, we discuss the need for and the benefits of such an approach. The separation of workflow management system and application systems is emphasized, and the consequences that arise for the architecture of workflow oriented information systems. This includes an appropriate workflow terminology, and the definition of standard interfaces for workflow aware application systems. Workflow studies in various institutions have shown that most of the processes in radiology are well structured and suited for a workflow management approach. Numerous commercially available Workflow Management Systems (WfMS) were investigated, and some of them, which are process- oriented and application independent, appear suitable for use in radiology.

  14. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.

  15. Decision making in a human population living sustainably.

    PubMed

    Hicks, John S; Burgman, Mark A; Marewski, Julian N; Fidler, Fiona; Gigerenzer, Gerd

    2012-10-01

    The Tiwi people of northern Australia have managed natural resources continuously for 6000-8000 years. Tiwi management objectives and outcomes may reflect how they gather information about the environment. We qualitatively analyzed Tiwi documents and management techniques to examine the relation between the social and physical environment of decision makers and their decision-making strategies. We hypothesized that principles of bounded rationality, namely, the use of efficient rules to navigate complex decision problems, explain how Tiwi managers use simple decision strategies (i.e., heuristics) to make robust decisions. Tiwi natural resource managers reduced complexity in decision making through a process that gathers incomplete and uncertain information to quickly guide decisions toward effective outcomes. They used management feedback to validate decisions through an information loop that resulted in long-term sustainability of environmental use. We examined the Tiwi decision-making processes relative to management of barramundi (Lates calcarifer) fisheries and contrasted their management with the state government's management of barramundi. Decisions that enhanced the status of individual people and their attainment of aspiration levels resulted in reliable resource availability for Tiwi consumers. Different decision processes adopted by the state for management of barramundi may not secure similarly sustainable outcomes. ©2012 Society for Conservation Biology.

  16. Medical Management: Process Analysis Study Report

    DTIC Science & Technology

    2011-10-28

    in Medical Management (care coordinator, case manager, PCM, clinic nurses , referral management shop, utilization management?, etc). The goal is to...Enterprise Nursing Procedure Manual, revealed that fact from the Navy’s perspective. An OASD(HA) TRICARE Management Activity (TMA) Senior...Requirements Analyst, Clinical Information Management (IM) and retired Army Colonel Nurse , Patricia Kinder, essentially told us no single application suite

  17. Air Quality Management Process Cycle

    EPA Pesticide Factsheets

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  18. Predictive Analytics to Support Real-Time Management in Pathology Facilities.

    PubMed

    Lessard, Lysanne; Michalowski, Wojtek; Chen Li, Wei; Amyot, Daniel; Halwani, Fawaz; Banerjee, Diponkar

    2016-01-01

    Predictive analytics can provide valuable support to the effective management of pathology facilities. The introduction of new tests and technologies in anatomical pathology will increase the volume of specimens to be processed, as well as the complexity of pathology processes. In order for predictive analytics to address managerial challenges associated with the volume and complexity increases, it is important to pinpoint the areas where pathology managers would most benefit from predictive capabilities. We illustrate common issues in managing pathology facilities with an analysis of the surgical specimen process at the Department of Pathology and Laboratory Medicine (DPLM) at The Ottawa Hospital, which processes all surgical specimens for the Eastern Ontario Regional Laboratory Association. We then show how predictive analytics could be used to support management. Our proposed approach can be generalized beyond the DPLM, contributing to a more effective management of pathology facilities and in turn to quicker clinical diagnoses.

  19. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, United Space Alliance (USA) Director of Orbiter Operations Patty Stratton, and NASA Space Shuttle Program Manager William Parsons view the underside of Shuttle Discovery in Orbiter Processing Facility Bay 3. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, United Space Alliance (USA) Director of Orbiter Operations Patty Stratton, and NASA Space Shuttle Program Manager William Parsons view the underside of Shuttle Discovery in Orbiter Processing Facility Bay 3. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  20. Information Seeking in Uncertainty Management Theory: Exposure to Information About Medical Uncertainty and Information-Processing Orientation as Predictors of Uncertainty Management Success.

    PubMed

    Rains, Stephen A; Tukachinsky, Riva

    2015-01-01

    Uncertainty management theory outlines the processes through which individuals cope with health-related uncertainty. Information seeking has been frequently documented as an important uncertainty management strategy. The reported study investigates exposure to specific types of medical information during a search, and one's information-processing orientation as predictors of successful uncertainty management (i.e., a reduction in the discrepancy between the level of uncertainty one feels and the level one desires). A lab study was conducted in which participants were primed to feel more or less certain about skin cancer and then were allowed to search the World Wide Web for skin cancer information. Participants' search behavior was recorded and content analyzed. The results indicate that exposure to two health communication constructs that pervade medical forms of uncertainty (i.e., severity and susceptibility) and information-processing orientation predicted uncertainty management success.

  1. Predictive Analytics to Support Real-Time Management in Pathology Facilities

    PubMed Central

    Lessard, Lysanne; Michalowski, Wojtek; Chen Li, Wei; Amyot, Daniel; Halwani, Fawaz; Banerjee, Diponkar

    2016-01-01

    Predictive analytics can provide valuable support to the effective management of pathology facilities. The introduction of new tests and technologies in anatomical pathology will increase the volume of specimens to be processed, as well as the complexity of pathology processes. In order for predictive analytics to address managerial challenges associated with the volume and complexity increases, it is important to pinpoint the areas where pathology managers would most benefit from predictive capabilities. We illustrate common issues in managing pathology facilities with an analysis of the surgical specimen process at the Department of Pathology and Laboratory Medicine (DPLM) at The Ottawa Hospital, which processes all surgical specimens for the Eastern Ontario Regional Laboratory Association. We then show how predictive analytics could be used to support management. Our proposed approach can be generalized beyond the DPLM, contributing to a more effective management of pathology facilities and in turn to quicker clinical diagnoses. PMID:28269873

  2. Decision making for wildfires: A guide for applying a risk management process at the incident level

    Treesearch

    Mary A. Taber; Lisa M. Elenz; Paul G. Langowski

    2013-01-01

    This publication focuses on the thought processes and considerations surrounding a risk management process for decision making on wildfires. The publication introduces a six element risk management cycle designed to encourage sound risk-informed decision making in accordance with Federal wildland fire policy, although the process is equally applicable to non-Federal...

  3. Understanding human management of automation errors

    PubMed Central

    McBride, Sara E.; Rogers, Wendy A.; Fisk, Arthur D.

    2013-01-01

    Automation has the potential to aid humans with a diverse set of tasks and support overall system performance. Automated systems are not always reliable, and when automation errs, humans must engage in error management, which is the process of detecting, understanding, and correcting errors. However, this process of error management in the context of human-automation interaction is not well understood. Therefore, we conducted a systematic review of the variables that contribute to error management. We examined relevant research in human-automation interaction and human error to identify critical automation, person, task, and emergent variables. We propose a framework for management of automation errors to incorporate and build upon previous models. Further, our analysis highlights variables that may be addressed through design and training to positively influence error management. Additional efforts to understand the error management process will contribute to automation designed and implemented to support safe and effective system performance. PMID:25383042

  4. Understanding human management of automation errors.

    PubMed

    McBride, Sara E; Rogers, Wendy A; Fisk, Arthur D

    2014-01-01

    Automation has the potential to aid humans with a diverse set of tasks and support overall system performance. Automated systems are not always reliable, and when automation errs, humans must engage in error management, which is the process of detecting, understanding, and correcting errors. However, this process of error management in the context of human-automation interaction is not well understood. Therefore, we conducted a systematic review of the variables that contribute to error management. We examined relevant research in human-automation interaction and human error to identify critical automation, person, task, and emergent variables. We propose a framework for management of automation errors to incorporate and build upon previous models. Further, our analysis highlights variables that may be addressed through design and training to positively influence error management. Additional efforts to understand the error management process will contribute to automation designed and implemented to support safe and effective system performance.

  5. The six critical attributes of the next generation of quality management software systems.

    PubMed

    Clark, Kathleen

    2011-07-01

    Driven by both the need to meet regulatory requirements and a genuine desire to drive improved quality, quality management systems encompassing standard operating procedure, corrective and preventative actions and related processes have existed for many years, both in paper and electronic form. The impact of quality management systems on 'actual' quality, however, is often reported as far less than desired. A quality management software system that moves beyond formal forms-driven processes to include a true closed loop design, manage disparate processes across the enterprise, provide support for collaborative processes and deliver insight into the overall state of control has the potential to close the gap between simply accomplishing regulatory compliance and delivering measurable improvements in quality and efficiency.

  6. College & University Business Administration. Third Edition.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    This text presents indepth coverage of five areas of college and university business administration, including administrative management, business management, fiscal management, and financial accounting and reporting. The section on administrative management encompasses institutional planning, management information systems and data processing,…

  7. A holistic strategy for adaptive land management

    USDA-ARS?s Scientific Manuscript database

    Adaptive management is widely applied to natural resources management. Adaptive management can be generally defined as an iterative decision-making process that incorporates formulation of management objectives, actions designed to address these objectives, monitoring of results, and repeated adapta...

  8. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  9. Research and Implementation of Key Technologies in Multi-Agent System to Support Distributed Workflow

    NASA Astrophysics Data System (ADS)

    Pan, Tianheng

    2018-01-01

    In recent years, the combination of workflow management system and Multi-agent technology is a hot research field. The problem of lack of flexibility in workflow management system can be improved by introducing multi-agent collaborative management. The workflow management system adopts distributed structure. It solves the problem that the traditional centralized workflow structure is fragile. In this paper, the agent of Distributed workflow management system is divided according to its function. The execution process of each type of agent is analyzed. The key technologies such as process execution and resource management are analyzed.

  10. Application of fuzzy neural network technologies in management of transport and logistics processes in Arctic

    NASA Astrophysics Data System (ADS)

    Levchenko, N. G.; Glushkov, S. V.; Sobolevskaya, E. Yu; Orlov, A. P.

    2018-05-01

    The method of modeling the transport and logistics process using fuzzy neural network technologies has been considered. The analysis of the implemented fuzzy neural network model of the information management system of transnational multimodal transportation of the process showed the expediency of applying this method to the management of transport and logistics processes in the Arctic and Subarctic conditions. The modular architecture of this model can be expanded by incorporating additional modules, since the working conditions in the Arctic and the subarctic themselves will present more and more realistic tasks. The architecture allows increasing the information management system, without affecting the system or the method itself. The model has a wide range of application possibilities, including: analysis of the situation and behavior of interacting elements; dynamic monitoring and diagnostics of management processes; simulation of real events and processes; prediction and prevention of critical situations.

  11. Hispanic parents' experiences of the process of caring for a child undergoing routine surgery: a focus on pain and pain management.

    PubMed

    Olshansky, Ellen; Zender, Robynn; Kain, Zeev N; Rosales, Alvina; Guadarrama, Josue; Fortier, Michelle A

    2015-07-01

    The purpose was to understand the processes Hispanic parents undergo in managing postoperative care of children after routine surgical procedures. Sixty parents of children undergoing outpatient surgery were interviewed. Data were analyzed using grounded theory methodology. Parents experienced five subprocesses that comprised the overall process of caring for a child after routine surgery: (a) becoming informed; (b) preparing; (c) seeking reassurance; (d) communicating with one's child; and (e) making pain management decisions. Addressing cultural factors related to pain management in underserved families may instill greater confidence in managing pain. © 2015, Wiley Periodicals, Inc.

  12. High-volume workflow management in the ITN/FBI system

    NASA Astrophysics Data System (ADS)

    Paulson, Thomas L.

    1997-02-01

    The Identification Tasking and Networking (ITN) Federal Bureau of Investigation system will manage the processing of more than 70,000 submissions per day. The workflow manager controls the routing of each submission through a combination of automated and manual processing steps whose exact sequence is dynamically determined by the results at each step. For most submissions, one or more of the steps involve the visual comparison of fingerprint images. The ITN workflow manager is implemented within a scaleable client/server architecture. The paper describes the key aspects of the ITN workflow manager design which allow the high volume of daily processing to be successfully accomplished.

  13. Evidence-based management - healthcare manager viewpoints.

    PubMed

    Janati, Ali; Hasanpoor, Edris; Hajebrahimi, Sakineh; Sadeghi-Bazargani, Homayoun

    2018-06-11

    Purpose Hospital manager decisions can have a significant impact on service effectiveness and hospital success, so using an evidence-based approach can improve hospital management. The purpose of this paper is to identify evidence-based management (EBMgt) components and challenges. Consequently, the authors provide an improving evidence-based decision-making framework. Design/methodology/approach A total of 45 semi-structured interviews were conducted in 2016. The authors also established three focus group discussions with health service managers. Data analysis followed deductive qualitative analysis guidelines. Findings Four basic themes emerged from the interviews, including EBMgt evidence sources (including sub-themes: scientific and research evidence, facts and information, political-social development plans, managers' professional expertise and ethical-moral evidence); predictors (sub-themes: stakeholder values and expectations, functional behavior, knowledge, key competencies and skill, evidence sources, evidence levels, uses and benefits and government programs); EBMgt barriers (sub-themes: managers' personal characteristics, decision-making environment, training and research system and organizational issues); and evidence-based hospital management processes (sub-themes: asking, acquiring, appraising, aggregating, applying and assessing). Originality/value Findings suggest that most participants have positive EBMgt attitudes. A full evidence-based hospital manager is a person who uses all evidence sources in a six-step decision-making process. EBMgt frameworks are a good tool to manage healthcare organizations. The authors found factors affecting hospital EBMgt and identified six evidence sources that healthcare managers can use in evidence-based decision-making processes.

  14. Towards adaptive and integrated management paradigms to meet the challenges of water governance.

    PubMed

    Halbe, J; Pahl-Wostl, C; Sendzimir, J; Adamowski, J

    2013-01-01

    Integrated Water Resource Management (IWRM) aims at finding practical and sustainable solutions to water resource issues. Research and practice have shown that innovative methods and tools are not sufficient to implement IWRM - the concept needs to also be integrated in prevailing management paradigms and institutions. Water governance science addresses this human dimension by focusing on the analysis of regulatory processes that influence the behavior of actors in water management systems. This paper proposes a new methodology for the integrated analysis of water resources management and governance systems in order to elicit and analyze case-specific management paradigms. It builds on the Management and Transition Framework (MTF) that allows for the examination of structures and processes underlying water management and governance. The new methodology presented in this paper combines participatory modeling and analysis of the governance system by using the MTF to investigate case-specific management paradigms. The linking of participatory modeling and research on complex management and governance systems allows for the transfer of knowledge between scientific, policy, engineering and local communities. In this way, the proposed methodology facilitates assessment and implementation of transformation processes towards IWRM that require also the adoption of adaptive management principles. A case study on flood management in the Tisza River Basin in Hungary is provided to illustrate the application of the proposed methodology.

  15. Software And Systems Engineering Risk Management

    DTIC Science & Technology

    2010-04-01

    RSKM 2004 COSO Enterprise RSKM Framework 2006 ISO/IEC 16085 Risk Management Process 2008 ISO/IEC 12207 Software Lifecycle Processes 2009 ISO/IEC...1 Software And Systems Engineering Risk Management John Walz VP Technical and Conferences Activities, IEEE Computer Society Vice-Chair Planning...Software & Systems Engineering Standards Committee, IEEE Computer Society US TAG to ISO TMB Risk Management Working Group Systems and Software

  16. Lakes and ponds recreation management: a state-wide application of the visitor impact management process

    Treesearch

    Jerry J. Vaske; Rodney R. Zwick; Maureen P. Donnelly

    1992-01-01

    The Visitor Impact Management (VIM) process is designed to identify unacceptable changes occurring as a result of visitor use and to develop management strategies to keep visitor impacts within acceptable levels. All previous attempts to apply the VIM planning framework have concentrated on specific resources. This paper expands this focus to an entire state. Based on...

  17. 41 CFR 102-193.25 - What type of records management business process improvements should my agency strive to achieve?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS 193-CREATION, MAINTENANCE, AND USE OF RECORDS § 102... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What type of records management business process improvements should my agency strive to achieve? 102-193.25 Section 102-193.25...

  18. 30 CFR 585.647 - How will my GAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consistency under the Coastal Zone Management Act? 585.647 Section 585.647 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING... Management Act? Your GAP will be processed based on how your limited lease, ROW grant, or RUE grant was...

  19. 30 CFR 585.647 - How will my GAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... consistency under the Coastal Zone Management Act? 585.647 Section 585.647 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING... Management Act? Your GAP will be processed based on how your limited lease, ROW grant, or RUE grant was...

  20. 30 CFR 585.612 - How will my SAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... consistency under the Coastal Zone Management Act? 585.612 Section 585.612 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING... Plan § 585.612 How will my SAP be processed for Federal consistency under the Coastal Zone Management...

  1. 30 CFR 585.612 - How will my SAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... consistency under the Coastal Zone Management Act? 585.612 Section 585.612 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING... Plan § 585.612 How will my SAP be processed for Federal consistency under the Coastal Zone Management...

  2. Chapter 13 Application of landscape and habitat suitability models to conservation: the Hoosier National Forest land-management plan

    Treesearch

    Chadwick D. Rittenhouse; Stephen R. Shifley; William D. Dijak; Zhaofei Fan; Frank R., III Thompson; Joshua J. Millspaugh; Judith A. Perez; Cynthia M. Sandeno

    2011-01-01

    We demonstrate an approach to integrated land-management planning and quantify differences in vegetation and avian habitat conditions among 5 management alternatives as part of the Hoosier National Forest planning process. The alternatives differed in terms of the type, extent, magnitude, frequency, and location of management activities. We modeled ecological processes...

  3. Development of risk-based air quality management strategies under impacts of climate change.

    PubMed

    Liao, Kuo-Jen; Amar, Praveen; Tagaris, Efthimios; Russell, Armistead G

    2012-05-01

    Climate change is forecast to adversely affect air quality through perturbations in meteorological conditions, photochemical reactions, and precursor emissions. To protect the environment and human health from air pollution, there is an increasing recognition of the necessity of developing effective air quality management strategies under the impacts of climate change. This paper presents a framework for developing risk-based air quality management strategies that can help policy makers improve their decision-making processes in response to current and future climate change about 30-50 years from now. Development of air quality management strategies under the impacts of climate change is fundamentally a risk assessment and risk management process involving four steps: (1) assessment of the impacts of climate change and associated uncertainties; (2) determination of air quality targets; (3) selections of potential air quality management options; and (4) identification of preferred air quality management strategies that minimize control costs, maximize benefits, or limit the adverse effects of climate change on air quality when considering the scarcity of resources. The main challenge relates to the level of uncertainties associated with climate change forecasts and advancements in future control measures, since they will significantly affect the risk assessment results and development of effective air quality management plans. The concept presented in this paper can help decision makers make appropriate responses to climate change, since it provides an integrated approach for climate risk assessment and management when developing air quality management strategies. Development of climate-responsive air quality management strategies is fundamentally a risk assessment and risk management process. The risk assessment process includes quantification of climate change impacts on air quality and associated uncertainties. Risk management for air quality under the impacts of climate change includes determination of air quality targets, selections of potential management options, and identification of effective air quality management strategies through decision-making models. The risk-based decision-making framework can also be applied to develop climate-responsive management strategies for the other environmental dimensions and assess costs and benefits of future environmental management policies.

  4. Models of expert assessments and their study in problems of choice and decision-making in management of motor transport processes

    NASA Astrophysics Data System (ADS)

    Belokurov, V. P.; Belokurov, S. V.; Korablev, R. A.; Shtepa, A. A.

    2018-05-01

    The article deals with decision making concerning transport tasks on search iterations in the management of motor transport processes. An optimal selection of the best option for specific situations is suggested in the management of complex multi-criteria transport processes.

  5. 75 FR 22047 - Intent To Initiate Consultation and Coordinate the National Oceanic and Atmospheric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-27

    ... purposes and policies of the NMSA (73 FR 53161). The management plan review process occurs concurrently... management plan was written as part of the sanctuary designation process and published in the Final... Environmental Impact Statement under the authority of NEPA (73 FR 53161). The management plan review process is...

  6. Strategic survey framework for the Northwest Forest Plan survey and manage program.

    Treesearch

    Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler

    2003-01-01

    This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...

  7. 20 CFR 663.510 - Who is responsible for managing the eligible provider process?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Who is responsible for managing the eligible provider process? 663.510 Section 663.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... Eligible Training Providers § 663.510 Who is responsible for managing the eligible provider process? (a...

  8. 41 CFR 101-6.2109 - How does the Administrator receive and respond to comments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 6... transmits a State process recommendation for a program selected under § 101-6.2106. (b)(1) The single point... and entities where there is no State process recommendation. (2) If a State process recommendation is...

  9. Impression Management in Survey Responding: Easier for Collectivists or Individualists?

    PubMed Central

    Riemer, Hila; Shavitt, Sharon

    2012-01-01

    Three experiments indicate that when individualists and collectivists engage in impression management on self-reports, they do so through different psychological mechanism s. Collectivists do so through a relatively automatic process. Thus, they can impression manage even when cognitively busy. Individualists impression manage through a more effortful process. Therefore, they can do so only when the situation permits effortful processing. These findings highlight distinct conditions under which social norms may influence consumer self-reports across cultures. PMID:23175618

  10. Performance measurement: integrating quality management and activity-based cost management.

    PubMed

    McKeon, T

    1996-04-01

    The development of an activity-based management system provides a framework for developing performance measures integral to quality and cost management. Performance measures that cross operational boundaries and embrace core processes provide a mechanism to evaluate operational results related to strategic intention and internal and external customers. The author discusses this measurement process that allows managers to evaluate where they are and where they want to be, and to set a course of action that closes the gap between the two.

  11. 44 CFR 352.29 - Appeal process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Appeal process. 352.29 Section 352.29 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY PREPAREDNESS COMMERCIAL NUCLEAR POWER PLANTS: EMERGENCY PREPAREDNESS PLANNING Federal...

  12. 42 CFR 495.302 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management information system (MMIS) means a mechanized claims processing and information retrieval system—referred to as Medicaid Management Information Systems (MMIS)—that meets specified requirements and that... include claims processing and retrieval of utilization and management information necessary for program...

  13. Systems approach provides management control of complex programs

    NASA Technical Reports Server (NTRS)

    Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.

    1970-01-01

    Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

  14. General RMP Guidance - Chapter 5: Management System

    EPA Pesticide Factsheets

    If you have at least one Program 2 or Program 3 process, you are required to develop a management system to oversee the implementation of the risk management program elements, and designate responsibility for making process safety a constant priority.

  15. Adopting public values and climate change adaptation strategies in urban forest management: A review and analysis of the relevant literature.

    PubMed

    Ordóñez Barona, Camilo

    2015-12-01

    Urban trees are a dominant natural element in cities; they provide important ecosystem services to urban citizens and help urban areas adapt to climate change. Many rationales have been proposed to provide a purpose for urban forest management, some of which have been ineffective in addressing important ecological and social management themes. Among these rationales we find a values-based perspective, which sees management as a process where the desires of urban dwellers are met. Another perspective is climate change adaptation, which sees management as a process where urban forest vulnerability to climate change is reduced and resilience enhanced. Both these rationales have the advantage of complementing, enhancing, and broadening urban forest management objectives. A critical analysis of the literature on public values related to urban forests and climate change adaptation in the context of urban forests is undertaken to discuss what it means to adopt these two issues in urban forest management. The analysis suggests that by seeing urban forest management as a process by which public values are satisfied and urban-forest vulnerabilities to climate change are reduced, we can place issues such as naturalization, adaptive management, and engaging people in management at the centre of urban forest management. Focusing urban forest management on these issues may help ensure the success of programs focused on planting more trees and increasing citizen participation in urban forest management. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. 23 CFR 450.320 - Congestion management process in transportation management areas.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... travel demand reduction and operational management strategies. (b) The development of a congestion... appropriate analysis of reasonable (including multimodal) travel demand reduction and operational management... the analysis demonstrates that travel demand reduction and operational management strategies cannot...

  17. How Differences Between Manager and Clinician Perceptions of Safety Culture Impact Hospital Processes of Care.

    PubMed

    Richter, Jason; Mazurenko, Olena; Kazley, Abby Swanson; Ford, Eric W

    2017-11-04

    Evidenced-based processes of care improve patient outcomes, yet universal compliance is lacking, and perceptions of the quality of care are highly variable. The purpose of this study is to examine how differences in clinician and management perceptions on teamwork and communication relate to adherence to hospital processes of care. Hospitals submitted identifiable data for the 2012 Hospital Survey on Patient Safety Culture and the Centers for Medicare and Medicaid Services' Hospital Compare. The dependent variable was a composite, developed from the scores on adherence to acute myocardial infarction, heart failure, and pneumonia process of care measures. The primary independent variables reflected 4 safety culture domains: communication openness, feedback about errors, teamwork within units, and teamwork between units. We assigned each hospital into one of 4 groups based on agreement between managers and clinicians on each domain. Each hospital was categorized as "high" (above the median) or "low" (below) for clinicians and managers in communication and teamwork. We found a positive relationship between perceived teamwork and communication climate and processes of care measures. If managers and clinicians perceived the communication openness as high, the hospital was more likely to adhere with processes of care. Similarly, if clinicians perceived teamwork across units as high, the hospital was more likely to adhere to processes of care. Manager and staff perceptions about teamwork and communications impact adherence to processes of care. Policies should recognize the importance of perceptions of both clinicians and managers on teamwork and communication and seek to improve organizational climate and practices. Clinician perceptions of teamwork across units are more closely linked to processes of care, so managers should be cognizant and try to improve their perceptions.

  18. Land management: data availability and process understanding for global change studies.

    PubMed

    Erb, Karl-Heinz; Luyssaert, Sebastiaan; Meyfroidt, Patrick; Pongratz, Julia; Don, Axel; Kloster, Silvia; Kuemmerle, Tobias; Fetzel, Tamara; Fuchs, Richard; Herold, Martin; Haberl, Helmut; Jones, Chris D; Marín-Spiotta, Erika; McCallum, Ian; Robertson, Eddy; Seufert, Verena; Fritz, Steffen; Valade, Aude; Wiltshire, Andrew; Dolman, Albertus J

    2017-02-01

    In the light of daunting global sustainability challenges such as climate change, biodiversity loss and food security, improving our understanding of the complex dynamics of the Earth system is crucial. However, large knowledge gaps related to the effects of land management persist, in particular those human-induced changes in terrestrial ecosystems that do not result in land-cover conversions. Here, we review the current state of knowledge of ten common land management activities for their biogeochemical and biophysical impacts, the level of process understanding and data availability. Our review shows that ca. one-tenth of the ice-free land surface is under intense human management, half under medium and one-fifth under extensive management. Based on our review, we cluster these ten management activities into three groups: (i) management activities for which data sets are available, and for which a good knowledge base exists (cropland harvest and irrigation); (ii) management activities for which sufficient knowledge on biogeochemical and biophysical effects exists but robust global data sets are lacking (forest harvest, tree species selection, grazing and mowing harvest, N fertilization); and (iii) land management practices with severe data gaps concomitant with an unsatisfactory level of process understanding (crop species selection, artificial wetland drainage, tillage and fire management and crop residue management, an element of crop harvest). Although we identify multiple impediments to progress, we conclude that the current status of process understanding and data availability is sufficient to advance with incorporating management in, for example, Earth system or dynamic vegetation models in order to provide a systematic assessment of their role in the Earth system. This review contributes to a strategic prioritization of research efforts across multiple disciplines, including land system research, ecological research and Earth system modelling. © 2016 John Wiley & Sons Ltd.

  19. Vegetation management and protection research: Disturbance processes and ecosystem management

    Treesearch

    Robert D. Averill; Louise Larson; Jim Saveland; Philip Wargo; Jerry Williams; Melvin Bellinger

    1994-01-01

    This paper is intended to broaden awareness and help develop consensus among USDA Forest Service scientists and resource managers about the role and significance of disturbance in ecosystem dynamics and, hence, resource management. To have an effective ecosystem management policy, resource managers and the public must understand the nature of ecological resiliency and...

  20. Integrating fire management analysis into land management planning

    Treesearch

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  1. Implementing ecosystem management in public agencies: lessons from the U.S. Bureau of Land Management and the Forest Service.

    PubMed

    Koontz, Tomas M; Bodine, Jennifer

    2008-02-01

    Ecosystem management was formally adopted over a decade ago by many U.S. natural resource agencies, including the Forest Service and the Bureau of Land Management. This approach calls for management based on stakeholder collaboration; interagency cooperation; integration of scientific, social, and economic information; preservation of ecological processes; and adaptive management. Results of previous studies indicate differences in the extent to which particular components of ecosystem management would be implemented within the U.S. Forest Service and the Bureau of Land Management and suggest a number of barriers thought to impede implementation. Drawing on survey and interview data from agency personnel and stakeholders, we compared levels of ecosystem-management implementation in the Forest Service and Bureau of Land Management and identified the most important barriers to implementation. Agency personnel perceived similarly high levels of implementation on many ecosystem-management components, whereas stakeholders perceived lower levels. Agencies were most challenged by implementation of preservation of ecological processes, adaptive management, and integration of social and economic information, whereas the most significant barriers to implementation were political, cultural, and legal.

  2. 76 FR 43987 - Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... usable approach emerges from this process, the Pacific Council may consider a fishery management plan (FMP) amendment process beginning after November 2011 to adopt the approach as a formal conservation... Conservation and Management Act, provided the public [[Page 43988

  3. Ambiguous meanings of projects as facilitators of sensegiving.

    PubMed

    Lunkka, Nina; Suhonen, Marjo

    2015-10-01

    To describe mid-level nurse managers' experiences of sensegiving in the context of hospital projects. Sensegiving is about shaping and affecting how employees see themselves, their work and issues related to their work. It has been little studied in the context of hospital projects from mid-level nurse managers' point of view. Mid-level nurse managers (n = 10) were interviewed about their experiences of projects from the viewpoint of sensegiving during change processes. Data was analysed using discourse analysis. Three repertoires were constructed from the data: the repertoires of regeneration, control and humane. Projects were considered as appropriate ways for sensegiving in hospitals from the viewpoint of mid-level nurse managers. In order to use projects effectively in hospitals as means for change management mid-level nurse managers ought to enhance their role as interpreters during the change process (i.e. strengthen their visioning, talk and dialogue skills). Training on the nature of change as a social and interactive process could deepen mid-level nurse managers' understanding of the change process in the context of hospital projects. © 2014 John Wiley & Sons Ltd.

  4. 44 CFR 204.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information on the procedures for the declaration and grants management processes for the Fire Management... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Purpose. 204.1 Section 204.1 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY...

  5. The rhetoric and realities of integrating air quality into the local transport planning process in English local authorities.

    PubMed

    Olowoporoku, Dotun; Hayes, Enda; Longhurst, James; Parkhurst, Graham

    2012-06-30

    Regardless of its intent and purposes, the first decade of the Local Air Quality Management (LAQM) framework had little or no effect in reducing traffic-related air pollution in the UK. Apart from the impact of increased traffic volumes, the major factor attributed to this failure is that of policy disconnect between the process of diagnosing air pollution and its management, thereby limiting the capability of local authorities to control traffic-related sources of air pollution. Integrating air quality management into the Local Transport Plan (LTP) process therefore presents opportunities for enabling political will, funding and joined-up policy approach to reduce this limitation. However, despite the increased access to resources for air quality measures within the LTP process, there are local institutional, political and funding constraints which reduce the impact of these policy interventions on air quality management. This paper illustrate the policy implementation gaps between central government policy intentions and the local government process by providing evidence of the deprioritisation of air quality management compared to the other shared priorities in the LTP process. We draw conclusions on the policy and practice of integrating air quality management into transport planning. The evidence thereby indicate the need for a policy shift from a solely localised hotspot management approach, in which the LAQM framework operates, to a more holistic management of vehicular emissions within wider spatial administrative areas. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. Guidelines for developing NASA (National Aeronautics and Space Administration) ADP security risk management plans

    NASA Technical Reports Server (NTRS)

    Tompkins, F. G.

    1983-01-01

    This report presents guidance to NASA Computer security officials for developing ADP security risk management plans. The six components of the risk management process are identified and discussed. Guidance is presented on how to manage security risks that have been identified during a risk analysis performed at a data processing facility or during the security evaluation of an application system.

  7. The Finnish healthcare services lean management.

    PubMed

    Hihnala, Susanna; Kettunen, Lilja; Suhonen, Marjo; Tiirinki, Hanna

    2018-02-05

    Purpose The purpose of this paper is to discuss health services managers' experiences of management in a special health-care unit and development efforts from the point of view of the Lean method. Additionally, the aim is to deepen the knowledge of the managers' work and nature of the Lean method development processes in the workplace. The research focuses on those aspects and results of Lean method that are currently being used in health-care environments. Design/methodology/approach These data were collected through a number of thematic interviews. The participants were nurse managers ( n = 7) and medical managers ( n = 7) who applied Lean management in their work at the University Hospital in the Northern Ostrobothnia Health Care District. The data were analysed with a qualitative content analysis. Findings A common set of values in specialized health-care services, development of activities and challenges for management in the use of the Lean manager development model to improve personal management skills. Practical implications Managers in specialized health-care services can develop and systematically manage with the help of the Lean method. This emphasizes assumptions, from the point of view of management, about systems development when the organization uses the Lean method. The research outcomes originate from specialized health-care settings in Finland in which the Lean method and its associated management principles have been implemented and applied to the delivery of health care. Originality/value The study shows that the research results and in-depth knowledge on Lean method principles can be applied to health-care management and development processes. The research also describes health services managers' experiences of using the Lean method. In the future, these results can be used to improve Lean management skills, identify personal professional competencies and develop skills required in development processes. Also, the research findings can be used in the training of health services managers in the health-care industry worldwide and to help them survive the pressure to change repeatedly.

  8. Evaluating the Facilities Planning, Design, and Construction Department: The Capital Programs Management Audit.

    ERIC Educational Resources Information Center

    Kaiser, Harvey H.; Kirkwood, Dennis M.

    2000-01-01

    Presents a diagnostic model for assessing the state of an institution's capital programs management (CPM) by delineating "work processes" which comprise that function. What capital programs management is, its resources, and its phases and work processes are described, followed by case studies of the CPM Process Model as an assessment tool. (GR)

  9. The Role of Threat Assessment and Management in College Counseling: How's That Net Working?

    ERIC Educational Resources Information Center

    Pollard, Jeffrey W.; Flynn, Christopher; Eells, Gregory T.

    2015-01-01

    The authors respond to Goodwin's (2014) "Threat Assessment: Are We Using the Wrong Nets?" and use that article as a springboard to discuss various aspects of the threat assessment and management process. We find that Goodwin misses critical elements of the threat assessment and management process, conflates the process with two types of…

  10. Uncertainty Concerning the Efficiency and Effectiveness of Red Clay's Data Management and Processing Services

    ERIC Educational Resources Information Center

    Ammann, Charles

    2010-01-01

    For twenty-nine years, Red Clay Consolidated School District has managed data processing in a unique manner. Red Clay participates in the Data Service Center consortium to provide data management and processing services. This consortium is more independent than a department in the district but not as autonomous as an outsourced arrangement. While…

  11. The Impact of Knowledge Management and Technology: An Analysis of Administrative Behaviours

    ERIC Educational Resources Information Center

    Nurluoz, Ozdem; Birol, Cem

    2011-01-01

    Knowledge management is crucial in higher education practices that refer knowledge sharing, feedback and communication process as part of the quality improvements. In this process, technology has a role to diffuse knowledge and create a link for sharing within the knowledge management process. In this respect, this research study aims to examine…

  12. Design of distributed systems of hydrolithospere processes management. Selection of optimal number of extracting wells

    NASA Astrophysics Data System (ADS)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The article considers the important issue of designing the distributed systems of hydrolithospere processes management. Control effects on the hydrolithospere processes are implemented by a set of extractive wells. The article shows how to determine the optimal number of extractive wells that provide a distributed control impact on the management object.

  13. 44 CFR Appendix A to Part 9 - Decision-making Process for E.O. 11988

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Decision-making Process for E.O. 11988 A Appendix A to Part 9 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT..., App. A Appendix A to Part 9—Decision-making Process for E.O. 11988 EC02FE91.074 ...

  14. Database management systems for process safety.

    PubMed

    Early, William F

    2006-03-17

    Several elements of the process safety management regulation (PSM) require tracking and documentation of actions; process hazard analyses, management of change, process safety information, operating procedures, training, contractor safety programs, pre-startup safety reviews, incident investigations, emergency planning, and compliance audits. These elements can result in hundreds of actions annually that require actions. This tracking and documentation commonly is a failing identified in compliance audits, and is difficult to manage through action lists, spreadsheets, or other tools that are comfortably manipulated by plant personnel. This paper discusses the recent implementation of a database management system at a chemical plant and chronicles the improvements accomplished through the introduction of a customized system. The system as implemented modeled the normal plant workflows, and provided simple, recognizable user interfaces for ease of use.

  15. Service Contract Compliance Management in Business Process Management

    NASA Astrophysics Data System (ADS)

    El Kharbili, Marwane; Pulvermueller, Elke

    Compliance management is a critical concern for corporations, required to respect contracts. This concern is particularly relevant in the context of business process management (BPM) as this paradigm is getting adopted more widely for-designing and building IT systems. Enforcing contractual compliance needs to be modeled at different levels of a BPM framework, which also includes the service layer. In this paper, we discuss requirements and methods for modeling contractual compliance for an SOA-supported BPM. We also show how business rule management integrated into an industry BPM tool allows modeling and processing functional and non-functional-property constraints which may be extracted from business process contracts. This work proposes a framework that responds to the requirements identified and proposes an architecture implementing it. Our approach is also illustrated by an example.

  16. A PBOM configuration and management method based on templates

    NASA Astrophysics Data System (ADS)

    Guo, Kai; Qiao, Lihong; Qie, Yifan

    2018-03-01

    The design of Process Bill of Materials (PBOM) holds a hinge position in the process of product development. The requirements of PBOM configuration design and management for complex products are analysed in this paper, which include the reuse technique of configuration procedure and urgent management need of huge quantity of product family PBOM data. Based on the analysis, the function framework of PBOM configuration and management has been established. Configuration templates and modules are defined in the framework to support the customization and the reuse of configuration process. The configuration process of a detection sensor PBOM is shown as an illustration case in the end. The rapid and agile PBOM configuration and management can be achieved utilizing template-based method, which has a vital significance to improve the development efficiency for complex products.

  17. Managing for climate change on protected areas: An adaptive management decision making framework.

    PubMed

    Tanner-McAllister, Sherri L; Rhodes, Jonathan; Hockings, Marc

    2017-12-15

    Current protected area management is becoming more challenging with advancing climate change and current park management techniques may not be adequate to adapt for effective management into the future. The framework presented here provides an adaptive management decision making process to assist protected area managers with adapting on-park management to climate change. The framework sets out a 4 step process. One, a good understanding of the park's context within climate change. Secondly, a thorough understanding of the park management systems including governance, planning and management systems. Thirdly, a series of management options set out as an accept/prevent change style structure, including a systematic assessment of those options. The adaptive approaches are defined as acceptance of anthropogenic climate change impact and attempt to adapt to a new climatic environment or prevention of change and attempt to maintain current systems under new climatic variations. Last, implementation and monitoring of long term trends in response to ecological responses to management interventions and assessing management effectiveness. The framework addresses many issues currently with park management in dealing with climate change including the considerable amount of research focussing on 'off-reserve' strategies, and threats and stress focused in situ park management. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Insect pest management decisions in food processing facilities

    USDA-ARS?s Scientific Manuscript database

    Pest management decision making in food processing facilities such as flour mills, rice mills, human and pet food manufacturing facilities, distribution centers and warehouses, and retail stores is a challenging undertaking. Insect pest management programs require an understanding of the food facili...

  19. Meeting the needs of customers with health CRM.

    PubMed

    Phillips, Jon; Panchal, Samir

    2002-01-01

    Customer relationship management (CRM) is a business strategy, supported by applications and technologies, that can fundamentally transform how healthcare delivery organizations manage patient and physician interactions, reduce cost, improve customer-facing processes, drive market and revenue growth, and manage regulatory compliance processes.

  20. Teaching Strategic Management with a Business Game.

    ERIC Educational Resources Information Center

    Knotts, Ulysses S., Jr.; Keys, J. Bernard

    1997-01-01

    Management games are increasingly used to teaching strategic management by integrating functional areas of business and providing a working knowledge of the strategic management process. This article summarizes the experience of two veteran instructors, presenting course learning objectives, game pedagogy, team organization and management, game…

  1. Identification and induction of human, social, and cultural capitals through an experimental approach to stormwater management

    EPA Science Inventory

    Decentralized stormwater management is based on the dispersal of stormwater management practices (SWMP) throughout a watershed to manage stormwater runoff volume and potentially restore natural hydrologic processes. This approach to stormwater management is increasingly popular b...

  2. KENNEDY SPACE CENTER, FLA. -- NASA and United Space Alliance (USA) Space Shuttle program managers attend a briefing, part of activities during a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC. Starting third from left are NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, USA Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Space Shuttle Program Manager William Parsons, and USA Associate Program Manager of Ground Operations Andy Allen.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- NASA and United Space Alliance (USA) Space Shuttle program managers attend a briefing, part of activities during a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC. Starting third from left are NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, USA Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Space Shuttle Program Manager William Parsons, and USA Associate Program Manager of Ground Operations Andy Allen.

  3. Application of the enterprise management tools Lean Six Sigma and PMBOK in developing a program of research management.

    PubMed

    Hors, Cora; Goldberg, Anna Carla; Almeida, Ederson Haroldo Pereira de; Babio Júnior, Fernando Galan; Rizzo, Luiz Vicente

    2012-01-01

    Introduce a program for the management of scientific research in a General Hospital employing the business management tools Lean Six Sigma and PMBOK for project management in this area. The Lean Six Sigma methodology was used to improve the management of the institution's scientific research through a specific tool (DMAIC) for identification, implementation and posterior analysis based on PMBOK practices of the solutions found. We present our solutions for the management of institutional research projects at the Sociedade Beneficente Israelita Brasileira Albert Einstein. The solutions were classified into four headings: people, processes, systems and organizational culture. A preliminary analysis of these solutions showed them to be completely or partially compliant to the processes described in the PMBOK Guide. In this post facto study, we verified that the solutions drawn from a project using Lean Six Sigma methodology and based on PMBOK enabled the improvement of our processes dealing with the management of scientific research carried out in the institution and constitutes a model to contribute to the search of innovative science management solutions by other institutions dealing with scientific research in Brazil.

  4. A proposal for amending administrative law to facilitate adaptive management

    NASA Astrophysics Data System (ADS)

    Craig, Robin K.; Ruhl, J. B.; Brown, Eleanor D.; Williams, Byron K.

    2017-07-01

    In this article we examine how federal agencies use adaptive management. In order for federal agencies to implement adaptive management more successfully, administrative law must adapt to adaptive management, and we propose changes in administrative law that will help to steer the current process out of a dead end. Adaptive management is a form of structured decision making that is widely used in natural resources management. It involves specific steps integrated in an iterative process for adjusting management actions as new information becomes available. Theoretical requirements for adaptive management notwithstanding, federal agency decision making is subject to the requirements of the federal Administrative Procedure Act, and state agencies are subject to the states’ parallel statutes. We argue that conventional administrative law has unnecessarily shackled effective use of adaptive management. We show that through a specialized ‘adaptive management track’ of administrative procedures, the core values of administrative law—especially public participation, judicial review, and finality— can be implemented in ways that allow for more effective adaptive management. We present and explain draft model legislation (the Model Adaptive Management Procedure Act) that would create such a track for the specific types of agency decision making that could benefit from adaptive management.

  5. A proposal for amending administrative law to facilitate adaptive management

    USGS Publications Warehouse

    Craig, Robin K.; Ruhl, J.B.; Brown, Eleanor D.; Williams, Byron K.

    2017-01-01

    In this article we examine how federal agencies use adaptive management. In order for federal agencies to implement adaptive management more successfully, administrative law must adapt to adaptive management, and we propose changes in administrative law that will help to steer the current process out of a dead end. Adaptive management is a form of structured decision making that is widely used in natural resources management. It involves specific steps integrated in an iterative process for adjusting management actions as new information becomes available. Theoretical requirements for adaptive management notwithstanding, federal agency decision making is subject to the requirements of the federal Administrative Procedure Act, and state agencies are subject to the states' parallel statutes. We argue that conventional administrative law has unnecessarily shackled effective use of adaptive management. We show that through a specialized 'adaptive management track' of administrative procedures, the core values of administrative law—especially public participation, judicial review, and finality— can be implemented in ways that allow for more effective adaptive management. We present and explain draft model legislation (the Model Adaptive Management Procedure Act) that would create such a track for the specific types of agency decision making that could benefit from adaptive management.

  6. BPM 3.0

    NASA Astrophysics Data System (ADS)

    Scheer, August-Wilhelm; Klueckmann, Joerg

    Business Process Management (BPM) is an established management discipline. Since today’s organizations expect every employee to think and act like an entrepreneur, i.e., like a manager, BPM is also increasingly becoming part of everyday operations. But merely adopting a process-based approach across the enterprise is not enough to enable BPM at every level. What is needed is a combination of organizational forms and technologies that support distributed BPM initiatives while simultaneously consolidating them company-wide. Every employee must be empowered to model and optimize their own processes. At the same time, the entire BPM community needs a platform that brings together all the individual initiatives. This is the only way to leverage the full potential of process-oriented management. In the following article, the authors describe the trends in BPM development that are turning users into process managers and supporting the creation of a BPM community.

  7. Design distributed simulation platform for vehicle management system

    NASA Astrophysics Data System (ADS)

    Wen, Zhaodong; Wang, Zhanlin; Qiu, Lihua

    2006-11-01

    Next generation military aircraft requires the airborne management system high performance. General modules, data integration, high speed data bus and so on are needed to share and manage information of the subsystems efficiently. The subsystems include flight control system, propulsion system, hydraulic power system, environmental control system, fuel management system, electrical power system and so on. The unattached or mixed architecture is changed to integrated architecture. That means the whole airborne system is regarded into one system to manage. So the physical devices are distributed but the system information is integrated and shared. The process function of each subsystem are integrated (including general process modules, dynamic reconfiguration), furthermore, the sensors and the signal processing functions are shared. On the other hand, it is a foundation for power shared. Establish a distributed vehicle management system using 1553B bus and distributed processors which can provide a validation platform for the research of airborne system integrated management. This paper establishes the Vehicle Management System (VMS) simulation platform. Discuss the software and hardware configuration and analyze the communication and fault-tolerant method.

  8. Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report. [systems management evaluation and design analysis

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

  9. Integrating automated support for a software management cycle into the TAME system

    NASA Technical Reports Server (NTRS)

    Sunazuka, Toshihiko; Basili, Victor R.

    1989-01-01

    Software managers are interested in the quantitative management of software quality, cost and progress. An integrated software management methodology, which can be applied throughout the software life cycle for any number purposes, is required. The TAME (Tailoring A Measurement Environment) methodology is based on the improvement paradigm and the goal/question/metric (GQM) paradigm. This methodology helps generate a software engineering process and measurement environment based on the project characteristics. The SQMAR (software quality measurement and assurance technology) is a software quality metric system and methodology applied to the development processes. It is based on the feed forward control principle. Quality target setting is carried out before the plan-do-check-action activities are performed. These methodologies are integrated to realize goal oriented measurement, process control and visual management. A metric setting procedure based on the GQM paradigm, a management system called the software management cycle (SMC), and its application to a case study based on NASA/SEL data are discussed. The expected effects of SMC are quality improvement, managerial cost reduction, accumulation and reuse of experience, and a highly visual management reporting system.

  10. Decisionmaking under risk in invasive species management: risk management theory and applications

    Treesearch

    Shefali V. Mehta; Robert G. Haight; Frances R. Homans

    2010-01-01

    Invasive species management is closely entwined with the assessment and management of risk that arises from the inherently random nature of the invasion process. The theory and application of risk management for invasive species with an economic perspective is reviewed in this synthesis. Invasive species management can be delineated into three general categories:...

  11. Improvement of radiology services based on the process management approach.

    PubMed

    Amaral, Creusa Sayuri Tahara; Rozenfeld, Henrique; Costa, Janaina Mascarenhas Hornos; Magon, Maria de Fátima de Andrade; Mascarenhas, Yvone Maria

    2011-06-01

    The health sector requires continuous investments to ensure the improvement of products and services from a technological standpoint, the use of new materials, equipment and tools, and the application of process management methods. Methods associated with the process management approach, such as the development of reference models of business processes, can provide significant innovations in the health sector and respond to the current market trend for modern management in this sector (Gunderman et al. (2008) [4]). This article proposes a process model for diagnostic medical X-ray imaging, from which it derives a primary reference model and describes how this information leads to gains in quality and improvements. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  12. Measuring, managing and maximizing refinery performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bascur, O.A.; Kennedy, J.P.

    1996-01-01

    Implementing continuous quality improvement is a confluence of total quality management, people empowerment, performance indicators and information engineering. Supporting information technologies allow a refiner to narrow the gap between management objectives and the process control level. Dynamic performance monitoring benefits come from production cost savings, improved communications and enhanced decision making. A refinery workgroup information flow model helps automate continuous improvement of processes, performance and the organization. The paper discusses the rethinking of refinery operations, dynamic performance monitoring, continuous process improvement, the knowledge coordinator and repository manager, an integrated plant operations workflow, and successful implementation.

  13. Information Security Management (ISM)

    NASA Astrophysics Data System (ADS)

    Šalgovičová, Jarmila; Prajová, Vanessa

    2012-12-01

    Currently, all organizations have to tackle the issue of information security. The paper deals with various aspects of Information Security Management (ISM), including procedures, processes, organizational structures, policies and control processes. Introduction of Information Security Management should be a strategic decision. The concept and implementation of Information Security Management in an organization are determined by the corporate needs and objectives, security requirements, the processes deployed as well as the size and structure of the organization. The implementation of ISM should be carried out to the extent consistent with the needs of the organization.

  14. Professional commitment to changing chronic illness care: results from disease management programmes.

    PubMed

    Lemmens, Karin; Strating, Mathilde; Huijsman, Robbert; Nieboer, Anna

    2009-08-01

    The aim of this exploratory study was to investigate to what extent primary care professionals are able to change their systems for delivering care to chronic obstructive pulmonary disease (COPD) patients and what professional and organizational factors are associated with the degree of process implementation. Quasi-experimental design with 1 year follow-up after intervention. Three regional COPD management programmes in the Netherlands, in which general practices cooperated with regional hospitals. All participating primary care professionals (n = 52). COPD management programme. Professional commitment, organizational context and degree of process implementation. Professionals significantly changed their systems for delivering care to COPD patients, namely self-management support, decision support, delivery system design and clinical information systems. Associations were found between organizational factors, professional commitment and changes in processes of care. Group culture and professional commitment appeared to be, to a moderate degree, predictors of process implementation. COPD management was effective; all processes improved significantly. Moreover, theoretically expected associations between organizational context and professional factors with the implementation of COPD management were indeed confirmed to some extent. Group culture and professional commitment are important facilitators.

  15. Benefits of an automated GLP final report preparation software solution.

    PubMed

    Elvebak, Larry E

    2011-07-01

    The final product of analytical laboratories performing US FDA-regulated (or GLP) method validation and bioanalysis studies is the final report. Although there are commercial-off-the-shelf (COTS) software/instrument systems available to laboratory managers to automate and manage almost every aspect of the instrumental and sample-handling processes of GLP studies, there are few software systems available to fully manage the GLP final report preparation process. This lack of appropriate COTS tools results in the implementation of rather Byzantine and manual processes to cobble together all the information needed to generate a GLP final report. The manual nature of these processes results in the need for several iterative quality control and quality assurance events to ensure data accuracy and report formatting. The industry is in need of a COTS solution that gives laboratory managers and study directors the ability to manage as many portions as possible of the GLP final report writing process and the ability to generate a GLP final report with the click of a button. This article describes the COTS software features needed to give laboratory managers and study directors such a solution.

  16. Analysis of Management Control Techniques for the Data Processing Department at the Navy Finance Center, Cleveland, Ohio.

    DTIC Science & Technology

    1983-03-01

    Sysiem are: Order processinq coordinators Order processing management Credit and collections Accounts receivable Support management Admin ianagemenr...or sales secretary, then by order processing (OP). Phone-in orders go directly to OP. The infor- mation is next Transcribed onto an order entry... ORDER PROCESSING : The central systems validate The order items and codes t!, processing them against the customer file, the prodicT or PA? ts file, and

  17. Joint Chiefs of Staff > Directorates > Directorates of Management

    Science.gov Websites

    establishes information management requirements and manages the corporate Joint Staff decision process to Force Chief of Staff Chief of National Guard Bureau Biographies Directorates Directorates of Management J8 | Force Structure, Resources & Assessment Contact Directorate of Management Home

  18. 78 FR 20260 - Fisheries of the Northeastern United States; Northeast Multispecies Fishery Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... subsequent fishing years. * * * * * (c) * * * (1) Adjustment process. (i) After a management action has been... Management Plan; Amendment 19 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and... 19 to the Northeast Multispecies Fishery Management Plan. The New England Fishery Management Council...

  19. Integrating Organizational Learning and Business Praxis: A Case for Intelligent Project Management.

    ERIC Educational Resources Information Center

    Cavaleri, Steven A.; Fearon, David S.

    2000-01-01

    Project management provides a natural home for organizational learning, freeing it from mechanical processes. Organizational learning plays a critical role in intelligent project management, which combines manageability, performance outcomes of knowledge management, and innovation. Learning should be integrated into an organization's core…

  20. Managing Conflict in Temporary Management Systems

    ERIC Educational Resources Information Center

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  1. 41 CFR 105-60.405 - Processing requests for confidential commercial information.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Processing requests for confidential commercial information. 105-60.405 Section 105-60.405 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  2. 41 CFR 105-60.405 - Processing requests for confidential commercial information.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Processing requests for confidential commercial information. 105-60.405 Section 105-60.405 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  3. 41 CFR 105-60.405 - Processing requests for confidential commercial information.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Processing requests for confidential commercial information. 105-60.405 Section 105-60.405 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  4. KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician discusses aspects of Shuttle processing performed in the Solid Rocket Booster (SRB) Assembly and Refurbishment Facility (ARF) with USA Vice President and Space Shuttle Program Manager Howard DeCastro and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician discusses aspects of Shuttle processing performed in the Solid Rocket Booster (SRB) Assembly and Refurbishment Facility (ARF) with USA Vice President and Space Shuttle Program Manager Howard DeCastro and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  5. KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (center) are briefed on the use of a cold plate in Orbiter Processing Facility Bay 2 by a USA technician (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (center) are briefed on the use of a cold plate in Orbiter Processing Facility Bay 2 by a USA technician (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  6. PMIS Project. Planning & Management Information System. A Project To Develop a Data Processing System for Support of the Planning and Management Needs of Local School Districts. Final Report, Year 2.

    ERIC Educational Resources Information Center

    Council of the Great City Schools, Washington, DC.

    This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…

  7. Crew interface specifications development functions, phase 3A

    NASA Technical Reports Server (NTRS)

    Carl, J. G.

    1973-01-01

    The findings and data products developed during the crew interface specification study for inflight maintenance and stowage functions are presented. Guidelines are provided for improving the present progress of defining, controlling, and managing the flight crew requirements. The following data products were developed: (1) description of inflight maintenance management process, (2) specifications for inflight maintenance management requirements, and (3) suggested inflight maintenance data processing reports for logistics management.

  8. Tinnitus: a management model.

    PubMed

    Stephens, S D; Hallam, R S; Jakes, S C

    1986-08-01

    A comprehensive model of tinnitus management is proposed. As it is rarely possible to abolish the symptom, management of the tinnitus patient must aim at precipitating the habituation process. The model is split into 'evaluation' and 'remediation' sections. In each section the various aspects of management are discussed. Together with traditional factors, the importance of psychological processes is stressed. The role of the expectations of the patient in limiting remedial possibilities is also discussed.

  9. Requirements for company-wide management

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1980-01-01

    Computing system requirements were developed for company-wide management of information and computer programs in an engineering data processing environment. The requirements are essential to the successful implementation of a computer-based engineering data management system; they exceed the capabilities provided by the commercially available data base management systems. These requirements were derived from a study entitled The Design Process, which was prepared by design engineers experienced in development of aerospace products.

  10. Decision making and senior management: the implementation of change projects covering clinical management in SUS hospitals.

    PubMed

    Pacheco, José Márcio da Cunha; Gomes, Romeu

    2016-08-01

    This paper analyses the decision making process for senior management in public hospitals that are a part of the National Health Service in Brazil (hereafter SUS) in relation to projects aimed at changing clinical management. The methodological design of this study is qualitative in nature taking a hermeneutics-dialectics perspective in terms of results. Hospital directors noted that clinical management projects changed the state of hospitals through: improving their organizations, mobilizing their staff in order to increase a sense of order and systemizing actions and available resources. Technical rationality was the principal basis used in the decision making process for managers. Due to the reality of many hospitals having fragmented organizations, this fact impeded the use of aspects related to rationality, such as economic and financial factors in the decision making process. The incremental model and general politics also play a role in this area. We concluded that the decision making process embraces a large array of factors including rational aspects such as the use of management techniques and the ability to analyze, interpret and summarize. It also incorporates subjective elements such as how to select values and dealing with people's working experiences. We recognized that management problems are wide in scope, ambiguous, complex and do not come with a lot of structure in practice.

  11. Risk Management for the International Space Station

    NASA Technical Reports Server (NTRS)

    Sebastian, J.; Brezovic, Philip

    2002-01-01

    The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.

  12. Business continuity and risk management at a strategic level: Case study of the Flemish government.

    PubMed

    Bouve, Joris; Steens, Herman-Peter; Ruebens, Martin

    2018-01-01

    The Flemish government comprises a number of different departments and agencies with the autonomy to optimise their service level in a proactive and resilient manner. Recently, the Flemish government defined four organisational values: openness, decisiveness, trust and agility. In addition, the Internal Audit Agency developed guidelines concerning internal control and organisational management, in which risk management was emphasised. In combination with goal setting and process management, this paper considers risk management as a starting point for the overall management of Flemish government entities. The paper then develops tools to support the establishment of business continuity and risk management processes. These tools fit into the organisation's strategic framework and are easy to understand, pragmatically designed and flexible in their use. The paper goes on to illustrate how the Department of the Chancellery and Public Governance is implementing BCM and risk management, and how it is integrating BCM, risk management and crisis management. It will then focus on the Flemish government's long-term strategy across the boundaries between the different entities and the question of how risk management can become a useful tool for policy makers.

  13. Sustainable wetland management and support of ecosystem services

    USGS Publications Warehouse

    Smith, Loren M.; Euliss, Ned H.; Wilcox, Douglas A.; Brinson, Mark M.

    2009-01-01

    This article is a follow-up on a previous piece in the National Wetlands Newsletter in which we outlined problems associated with a static, local approach to wetland management versus an alternative that proposes a temporal and geomorphic approach (Euliss et al. 2009). We extend that concept by drawing on companion papers recently published in the journal Wetlands (Euliss et al. 2008, Smith et al. 2008). Here we highlight reasons for the failure of many managed wetlands to provide a suite of ecosystem services (e.g., carbon storage, diodiversity, ground-water recharge, contaminant filtering, floodwater storage). Our principal theme is that wetland management is best approached by giving consideration to the hydrogeomorphic processes that maintain productive ecosystems and by removing physical and social impediments to those processes. Traditional management actions are often oriented toward maintaining static conditions in wetlands without considering the temporal cycles that wetlands need to undergo or achieve productivity for specific groups of wildlife, such as waterfowl. Possibly more often, a manager's ability to influence hydrogeomorphic processes is restricted by activities in surrounding watersheds. These could be dams, for example, which do not allow management of flood-pulse processes essential to productivity of riparian systems. In most cases, sediments and nutrients associated with land use in contributing watersheds complicate management of wetlands for a suite of services, including wildlife. Economic or policy forces far-removed from a wetland often interact to prevent occurrence of basic ecosystem processes. Our message is consistent with recommendation of supply-side sustainability of Allen et al. (2002) in which ecosystems are managed "for the system that produces outputs rather than the outputs themselves."

  14. Exemplars in the use of technology for management of depression in primary care.

    PubMed

    Serrano, Neftali; Molander, Rachel; Monden, Kimberley; Grosshans, Ashley; Krahn, Dean D

    2012-06-01

    Depression care management as part of larger efforts to integrate behavioral health care into primary care has been shown to be effective in helping patients and primary care clinicians achieve improved outcomes within the primary care environment. Central to care management systems is the use of registries which enable effective clinic population management. The aim of this article is to detail the methods and utility of technology in depression care management processes while also highlighting the real-world variations and barriers that exist in different clinical environments, namely a federally qualified health center and a Veterans Administration clinic. We analyzed descriptive data from the registries of Access Community Health Centers and the William S. Middleton Veterans Administration clinics along with historical reviews of their respective care management processes. Both registry reviews showed trend data indicating improvement in scores of depression and provided baseline data on important system variables, such as the number of patients who are not making progress, the percentage of patients who are unreachable by phone, and the kind of actions needed to ensure evidence-based and efficient care. Both sites also highlighted systemic technical barriers to more complete implementation of care management processes. Care management processes are an effective and efficient part of population-based care for depression in primary care. Implementation depends on available resources including hardware, software, and clinical personnel. Additionally, care management processes and technology have evolved over time based on local needs and are part of an integrated method to support the work of primary care clinicians in providing care for patients with depression.

  15. Adaptive management of urban watersheds

    NASA Astrophysics Data System (ADS)

    Garmestani, A.; Shuster, W.; Green, O. O.

    2013-12-01

    Consent decree settlements for violations of the Clean Water Act (1972) increasingly include provisions for redress of combined sewer overflow activity through hybrid approaches that incorporate the best of both gray (e.g., storage tunnels) and green infrastructure (e.g., rain gardens). Adaptive management is an environmental management strategy that uses an iterative process of decision-making to improve environmental management via system monitoring. A central tenet of adaptive management is that management involves a learning process that can help regulated communities achieve environmental quality objectives. We are using an adaptive management approach to guide a green infrastructure retrofit of a neighborhood in the Slavic Village Development Corporation area (Cleveland, Ohio). We are in the process of gathering hydrologic and ecosystem services data and will use this data as a basis for collaboration with area citizens on a plan to use green infrastructure to contain stormflows. Monitoring data provides researchers with feedback on the impact of green infrastructure implementation and suggest where improvements can be made.

  16. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  17. Distributed Information System Development: Review of Some Management Issues

    NASA Astrophysics Data System (ADS)

    Mishra, Deepti; Mishra, Alok

    Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.

  18. Quality management of human resources. Providers should begin by focusing on education, performance management, and reward systems.

    PubMed

    Blair, C S; Fordyce, M; Barney, S M

    1993-10-01

    For a quality management transformation to occur, a healthcare organization must focus on education and development, performance management, and recognition and reward systems during the first years of implementation. Education and development are perhaps the most important human resource management functions when implementing quality management principles and processes because behavioral changes will be required at all organizational levels. Specific programs that support an organization's quality management effort will vary but should include the conceptual, cultural, and technical aspects of quality management. The essence of quality management is to always satisfy the customer and to continuously improve the services and products the organization offers. The approach to performance management should therefore rely on customer feedback and satisfaction. An organization committed to quality management should base its performance management approach on customer orientation, process improvement, employee involvement, decision making with data, and continuous improvement. Managers and trustees are being challenged to provide innovative recognition and reward systems that reinforce the values and behaviors consistent with quality management. Such systems must also be aligned with the behaviors and outcomes that support the philosophy, mission, and values of the Catholic healthcare ministry. The following components should be considered for a recognition and reward system: base pay, incentives, benefits, and nonmonetary rewards.

  19. Engineering the Business of Defense Acquisition: An Analysis of Program Office Processes

    DTIC Science & Technology

    2015-05-01

    Information Technology and Business Process Redesign | MIT Sloan Management Review . MIT Sloan Management Review . Retrieved from http://sloanreview.mit.edu...links systems management to process execution Three Phases/ Multi-Year Effort (This Phase) Literature review Model development— Formal and...estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining

  20. Identifying Training Needs to Improve Indigenous Community Representatives Input into Environmental Resource Management Consultative Processes: A Case Study of the Bundjalung Nation

    ERIC Educational Resources Information Center

    Lloyd, David; Norrie, Fiona

    2004-01-01

    Despite increased engagement of Indigenous representatives as participants on consultative panels charged with processes of natural resource management, concerns have been raised by both Indigenous representatives and management agencies regarding the ability of Indigenous people to have quality input into the decisions these processes produce. In…

  1. Closing Intelligence Gaps: Synchronizing the Collection Management Process

    DTIC Science & Technology

    information flow. The US military divides the world into six distinct geographic areas with corresponding commanders managing risk and weighing...analyzed information , creating a mismatch between supply and demand. The result is a burden on all facets of the intelligence process. However, if the target...system, or problem requiring analysis is not collected, intelligence fails. Executing collection management under the traditional tasking process

  2. PSP, TSP, XP, CMMI...Eating the Alphabet Soup!

    DTIC Science & Technology

    2011-05-19

    Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other...4 Q tit t Continuous process improvement Organizational Performance Management Causal Analysis and Resolution Level Focus Process Areas Requirements...Project Management process standardization Risk management Decision Analysis and Resolution Product Integration 2 M d R i t t anage Basic Project

  3. 30 CFR 285.612 - How will my SAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How will my SAP be processed for Federal consistency under the Coastal Zone Management Act? 285.612 Section 285.612 Mineral Resources MINERALS... Plan § 285.612 How will my SAP be processed for Federal consistency under the Coastal Zone Management...

  4. Software Engineering Guidebook

    NASA Technical Reports Server (NTRS)

    Connell, John; Wenneson, Greg

    1993-01-01

    The Software Engineering Guidebook describes SEPG (Software Engineering Process Group) supported processes and techniques for engineering quality software in NASA environments. Three process models are supported: structured, object-oriented, and evolutionary rapid-prototyping. The guidebook covers software life-cycles, engineering, assurance, and configuration management. The guidebook is written for managers and engineers who manage, develop, enhance, and/or maintain software under the Computer Software Services Contract.

  5. Procedure for Electronic Management of Rulemaking and Other Docketed Records in the Federal Docket Management System

    EPA Pesticide Factsheets

    This procedure identifies the specific requirements, processes and supporting documents EPA uses to electronically manage rulemaking and other docketed records in the Federal Docket Management System (FDMS).

  6. NASA Occupational Health Program FY98 Self-Assessment

    NASA Technical Reports Server (NTRS)

    Brisbin, Steven G.

    1999-01-01

    The NASA Functional Management Review process requires that each NASA Center conduct self-assessments of each functional area. Self-Assessments were completed in June 1998 and results were presented during this conference session. During FY 97 NASA Occupational Health Assessment Team activities, a decision was made to refine the NASA Self-Assessment Process. NASA Centers were involved in the ISO registration process at that time and wanted to use the management systems approach to evaluate their occupational health programs. This approach appeared to be more consistent with NASA's management philosophy and would likely confer status needed by Senior Agency Management for the program. During FY 98 the Agency Occupational Health Program Office developed a revised self-assessment methodology based on the Occupational Health and Safety Management System developed by the American Industrial Hygiene Association. This process was distributed to NASA Centers in March 1998 and completed in June 1998. The Center Self Assessment data will provide an essential baseline on the status of OHP management processes at NASA Centers. That baseline will be presented to Enterprise Associate Administrators and DASHO on September 22, 1998 and used as a basis for discussion during FY 99 visits to NASA Centers. The process surfaced several key management system elements warranting further support from the Lead Center. Input and feedback from NASA Centers will be essential to defining and refining future self assessment efforts.

  7. Visual operations control in administrative environments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carson, M.L.; Levine, L.O.

    1995-03-01

    When asked what comes to mind when they think of ``controlling work`` in the office, people may respond with ``overbearing boss,`` ``no autonomy,`` or ``Theory X management.`` The idea of controlling work in white collar or administrative environments can have a negative connotation. However, office life is often chaotic and miserable precisely because the work processes are out of control, and managers must spend their time looking over people`s shoulders and fighting fires. While management styles and structures vary, the need for control of work processes does not. Workers in many environments are being reorganized into self-managed work teams. Thesemore » teams are expected to manage their own work through increased autonomy and empowerment. However, even empowered work teams must manage their work processes because of process variation. The amount of incoming jobs vary with both expected (seasonal) and unexpected demand. The mixture of job types vary over time, changing the need for certain skills or knowledge. And illness and turnover affect the availability of workers with needed skills and knowledge. Clearly, there is still a need to control work, whether the authority for controlling work is vested in one person or many. Visual control concepts provide simple, inexpensive, and flexible mechanisms for managing processes in work teams and continuous improvement administrative environments.« less

  8. The role of ecological monitoring in managing wilderness

    Treesearch

    Peter B. Landres

    1995-01-01

    Good management requires good information. Monitoring provides this information when it is structured into the process of management, well designed and executed. As federal and state agencies strive to implement a management paradigm based on sustaining ecosystems, ecological information becomes a vital part of managing natural resources. Inventory and monitoring...

  9. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  10. Disturbance processes and ecosystem management

    Treesearch

    Robert D. Averill; Louise Larson; Jim Saveland; Philip Wargo; Jerry Williams; Melvin Bellinger

    1994-01-01

    This paper is intended to broaden awareness and help develop consensus among USDA Forest Service scientists and resource managers about the role and significance of disturbance in ecosystem dynamics and, hence, resource management. To have an effective ecosystem management policy, resource managers and the public must understand the nature of ecological resiliency and...

  11. 44 CFR 204.24 - Determination on request for a fire management assistance declaration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.24 Determination on request for a fire management... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Determination on request for a fire management assistance declaration. 204.24 Section 204.24 Emergency Management and Assistance...

  12. 44 CFR 204.26 - Appeal of fire management assistance declaration denial.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAM Declaration Process § 204.26 Appeal of fire management assistance declaration denial. (a... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Appeal of fire management assistance declaration denial. 204.26 Section 204.26 Emergency Management and Assistance FEDERAL EMERGENCY...

  13. 44 CFR 204.24 - Determination on request for a fire management assistance declaration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.24 Determination on request for a fire management... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Determination on request for a fire management assistance declaration. 204.24 Section 204.24 Emergency Management and Assistance...

  14. 44 CFR 204.26 - Appeal of fire management assistance declaration denial.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAM Declaration Process § 204.26 Appeal of fire management assistance declaration denial. (a... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Appeal of fire management assistance declaration denial. 204.26 Section 204.26 Emergency Management and Assistance FEDERAL EMERGENCY...

  15. 44 CFR 204.26 - Appeal of fire management assistance declaration denial.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAM Declaration Process § 204.26 Appeal of fire management assistance declaration denial. (a... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Appeal of fire management assistance declaration denial. 204.26 Section 204.26 Emergency Management and Assistance FEDERAL EMERGENCY...

  16. 44 CFR 204.26 - Appeal of fire management assistance declaration denial.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAM Declaration Process § 204.26 Appeal of fire management assistance declaration denial. (a... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Appeal of fire management assistance declaration denial. 204.26 Section 204.26 Emergency Management and Assistance FEDERAL EMERGENCY...

  17. 44 CFR 204.24 - Determination on request for a fire management assistance declaration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.24 Determination on request for a fire management... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Determination on request for a fire management assistance declaration. 204.24 Section 204.24 Emergency Management and Assistance...

  18. 44 CFR 204.26 - Appeal of fire management assistance declaration denial.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAM Declaration Process § 204.26 Appeal of fire management assistance declaration denial. (a... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Appeal of fire management assistance declaration denial. 204.26 Section 204.26 Emergency Management and Assistance FEDERAL EMERGENCY...

  19. 44 CFR 204.24 - Determination on request for a fire management assistance declaration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ASSISTANCE GRANT PROGRAM Declaration Process § 204.24 Determination on request for a fire management... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Determination on request for a fire management assistance declaration. 204.24 Section 204.24 Emergency Management and Assistance...

  20. The Management and Demonstration System at Murray State University.

    ERIC Educational Resources Information Center

    Schroeder, Gary G.

    The management system in use at the Murray State University Teacher Corps Project is described. The system uses management by objectives and the demonstration approach, and encourages managers to focus on the development and demonstration of ideas, processes, and structures. The system's operating concepts of time management and human resources…

  1. Management Development and Training Program for Colleges and Universities. Program Handbook, May 1978.

    ERIC Educational Resources Information Center

    Higher Education Management Inst., Coconut Grove, FL.

    A Management Development and Training Program has been developed by the Higher Education Management Institute to improve the overall functioning of higher education organizations. The Institute believes management development and training can: add to individuals' knowledge and skills, increase awareness of management processes and systems;…

  2. Managers' Perceptions of the Importance of Topics for the High School Management Curriculum.

    ERIC Educational Resources Information Center

    Herbert, Bruce E.

    1989-01-01

    Small business managers rated the importance of 60 topics for a high school small business management/entrepreneurship course. Respondents (79 of 130) rated highest the topics related to management principles, human relations, and resource development. Computer/data processing and international business received low ratings. Significant…

  3. Building an Identity Management Governance Process

    ERIC Educational Resources Information Center

    Berg, Joanne E.; Kraemer, Ron; Raatz, Carla; Devoti, Steve

    2009-01-01

    A particular challenge in any campus environment is determining how requests for access to services and resources are managed. Who decides the technology, infrastructure, policy, business process and procedure? The involvement of key institutional leaders and stakeholders in identity management governance is the driving force behind the way the…

  4. Behavioural Change in Type 1 Diabetes Self-Management: Why and How?

    ERIC Educational Resources Information Center

    Wilson, Valerie L.

    2009-01-01

    Objective: To examine whether the communication process between diabetes health professionals and people intensively self-managing their type 1 diabetes influenced behavioural change. Design: Telephone interviews to provide insight into the communication process and its influence on diabetes intensive self-management behaviour. Setting:…

  5. Impression Management Training: Conceptualization and Application to Personal Selling.

    ERIC Educational Resources Information Center

    Leathers, Dale G.

    1988-01-01

    Discusses the importance of impression management, an individual's conscious attempt to exercise control over selected communicative behaviors and cues for purposes of making a desired impression. Provides a comprehensive conceptualization of the impression-management process, and demonstrates how this process can facilitate effective training of…

  6. 76 FR 72691 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... into the DLA accounting and financial management process. Records are used by the DOD Components who...: Financial Compliance and Process Management (J-89), Headquarters, Defense Logistics Agency, 8725 John J... DoD Components who receive accounting and financial management support from DLA under an...

  7. Problem Solving Teams in a Total Quality Management Environment.

    ERIC Educational Resources Information Center

    Towler, Constance F.

    1993-01-01

    Outlines the problem-solving team training process used at Harvard University (Massachusetts), including the size and formation of teams, roles, and time commitment. Components of the process are explained, including introduction to Total Quality Management (TQM), customer satisfaction, meeting management, Parker Team Player Survey, interactive…

  8. Nurse managers and the sandwich support model.

    PubMed

    Chisengantambu, Christine; Robinson, Guy M; Evans, Nina

    2018-03-01

    To explore the interplay between the work of nurse managers and the support they receive and provide. Support is the cornerstone of management practices and is pivotal in employees feeling committed to an organisation. Support for nurse managers is integral to effective health sector management; its characteristics merit more attention. The experiences of 15 nurse managers in rural health institutions in South Australia were explored using structured interviews, observation and document review. Effective decision making requires adequate support, which influences the perceptions and performance of nurse managers, creating an environment in which they feel appreciated and valued. An ideal support system is proposed, the "sandwich support model," to promote effective functioning and desirable patient outcomes via support "from above" and "from below." The need to support nurse managers effectively is crucial to how they function. The sandwich support model can improve management practices, more effectively assisting nurse managers. Organisations should revisit and strengthen support processes for nurse managers to maximize efficiencies. This paper contributes to understanding the importance of supporting nurse managers, identifying the processes used and the type of support offered. It highlights challenges and issues affecting support practices within the health sector. © 2017 John Wiley & Sons Ltd.

  9. A Study of the Air Force’s Exception Management Process: Its Effect on Customer Service and Order Processing

    DTIC Science & Technology

    1991-09-01

    The purpose of this study was two-fold; the first goal was to determine what the SBSS order processing is, and secondly to determine the effect the...current method of ECC management has on the SBSS order processing cycle and the level of customer service rendered by base supply. The research...revealed that exception management is a crucial component of a successful order processing function. Further, it was established that the level of customer

  10. Technologies and problems of reengineering of the business processes of company

    NASA Astrophysics Data System (ADS)

    Silka, Dmitriy

    2017-10-01

    Management of the combination of business processes is a modern approach in the field of business management. Together with a lot of management approaches business processes allow us to identify all the resultant actions. Article reveals the modern view on the essence of business processes as well as the general approaches of their allocation. Principles of construction and business process re-engineering are proposed. Recommendations on how to perform re-engineering under high cyclic dynamics of business activity are provided.

  11. Safety evaluation of access management policies and techniques, TechBrief

    DOT National Transportation Integrated Search

    2015-08-01

    Access management is the process that provides (or manages) access to land development while simultaneously preserving the flow of traffic on the surrounding road network for safety, capacity, and speed. Access management provides important benefits ...

  12. Strategic Information Resources Management: Fundamental Practices.

    ERIC Educational Resources Information Center

    Caudle, Sharon L.

    1996-01-01

    Discusses six fundamental information resources management (IRM) practices in successful organizations that can improve government service delivery performance. Highlights include directing changes, integrating IRM decision making into a strategic management process, performance management, maintaining an investment philosophy, using business…

  13. A guide for local agency pavement managers

    DOT National Transportation Integrated Search

    1994-12-01

    The purpose of this guide is to provide Washington's local agencies with a practical document that will assist pavement managers in understanding the pavement management process and the steps necessary to implement their own pavement management syste...

  14. 47 CFR 0.11 - Functions of the Office.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; information management and processing; organization planning; management analysis; procurement; office space... Bureaus and Offices with respect to management and administrative matters but not substantive regulatory..., and adjudication. (2) Formulate and administer all management and administrative policies, programs...

  15. 47 CFR 0.11 - Functions of the Office.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; information management and processing; organization planning; management analysis; procurement; office space... Bureaus and Offices with respect to management and administrative matters but not substantive regulatory..., and adjudication. (2) Formulate and administer all management and administrative policies, programs...

  16. Integrated Work Management: FOD/RLM, Course 31882

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, Lewis Edward

    The facility operations director (FOD) and responsible line manager (RLM) play leadership and functional roles in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL). This course, Integrated Work Management: FOD/RLM (COURSE 31882), describes the IWM roles and responsibilities of the FOD and the RLM; it also discusses IWM requirements that must be met by the FOD and the RLM. Before taking this course, you may want to take COURSE 31881, Integrated Work Management: Overview. This self-study course would be particularly helpful if you are unfamiliar with the IWM process. You should also read Procedure (P) 300,more » Integrated Work Management. This course briefly covers the roles of the preparer and person in charge (PIC). For more in-depth instruction on the preparer’s role, see COURSE 31883, Integrated Work Management: Preparer. For instruction on the PIC’s role, see COURSE 31884, Integrated Work Management: PIC.« less

  17. Managing implementation: roles of line managers, senior managers, and human resource professionals in an occupational health intervention.

    PubMed

    Hasson, Henna; Villaume, Karin; von Thiele Schwarz, Ulrica; Palm, Kristina

    2014-01-01

    To contrast line managers', senior managers', and (human resource) HR professionals' descriptions of their roles, tasks, and possibilities to perform them during the implementation of an occupational health intervention. Interviews with line managers (n = 13), senior managers (n = 7), and HR professionals (n = 9) 6 months after initiation of an occupational health intervention at nine organizations. The groups' roles were described coherently, except for the HR professionals. These roles were seldom performed in practice, and two main reasons appeared: use of individuals' engagement rather than an implementation strategy, and lack of integration of the intervention with other stakeholders and organizational processes. Evaluation of stakeholders' perceptions of each other's and their own roles is important, especially concerning HR professionals. Clear role descriptions and implementation strategies, and aligning an intervention to organizational processes, are crucial for efficient intervention management.

  18. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  19. Integrated Work Management: PIC, Course 31884

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpson, Lewis Edward

    The person-in-charge (PIC) plays a key role in the integrated work management (IWM) process at Los Alamos National Laboratory (LANL, or the Laboratory) because the PIC is assigned responsibility and authority by the responsible line manager (RLM) for the overall validation, coordination, release, execution, and closeout of a work activity in accordance with IWM. This course, Integrated Work Management: PIC (Course 31884), describes the PIC’s IWM roles and responsibilities. This course also discusses IWM requirements that the PIC must meet. For a general overview of the IWM process, see self-study Course 31881, Integrated Work Management: Overview. For instruction on themore » preparer’s role, see self-study Course 31883, Integrated Work Management: Preparer.« less

  20. Total Quality Management (TQM). Process Action Team Course

    DTIC Science & Technology

    1990-05-30

    SHET SC EXHAUSTE May 30,1990 DEPARTMENT OF DEFENSE Lfl N CI TOTAL QUALITY MANAGEMENT (TQM) Process Action Team Coursef ©990, Booz.Allen & Hamilton Inc...organization’s TQM infrastructure. If you need additional information, please refer to the student manual, Total Quality Management (TOM) Awareness Seminar that...Programs. These efforts were identified in Appendix A of Booz, Allen’s training manual Qtl Quality Management Awareness Seminar. Revision 5, November 15

  1. Capacity shortfalls hinder the performance of marine protected areas globally

    NASA Astrophysics Data System (ADS)

    Gill, David A.; Mascia, Michael B.; Ahmadia, Gabby N.; Glew, Louise; Lester, Sarah E.; Barnes, Megan; Craigie, Ian; Darling, Emily S.; Free, Christopher M.; Geldmann, Jonas; Holst, Susie; Jensen, Olaf P.; White, Alan T.; Basurto, Xavier; Coad, Lauren; Gates, Ruth D.; Guannel, Greg; Mumby, Peter J.; Thomas, Hannah; Whitmee, Sarah; Woodley, Stephen; Fox, Helen E.

    2017-03-01

    Marine protected areas (MPAs) are increasingly being used globally to conserve marine resources. However, whether many MPAs are being effectively and equitably managed, and how MPA management influences substantive outcomes remain unknown. We developed a global database of management and fish population data (433 and 218 MPAs, respectively) to assess: MPA management processes; the effects of MPAs on fish populations; and relationships between management processes and ecological effects. Here we report that many MPAs failed to meet thresholds for effective and equitable management processes, with widespread shortfalls in staff and financial resources. Although 71% of MPAs positively influenced fish populations, these conservation impacts were highly variable. Staff and budget capacity were the strongest predictors of conservation impact: MPAs with adequate staff capacity had ecological effects 2.9 times greater than MPAs with inadequate capacity. Thus, continued global expansion of MPAs without adequate investment in human and financial capacity is likely to lead to sub-optimal conservation outcomes.

  2. Principles and processes for effecting change in environmental management in New Zealand.

    PubMed

    Valentine, Ian; Hurley, Evelyn; Reid, Janet; Allen, Will

    2007-02-01

    In New Zealand environmental management is essentially the responsibility of land managers. Management decisions affect both production/productivity and the environment. However, responsibility for ensuring positive environmental outcomes falls on both local (Regional) and Central Government, and both they and international agencies such as the OECD would wish to monitor and report on changes. In terms of policy, strong links have been established via Central and Regional Government to land managers. Consumers in the market place are also, increasingly, requiring responsibility for positive environmental outcomes of those who purchase and process primary products. Strong links for responsibility have been established between our international markets and processing businesses and there is a noticeable strengthening of the links from the processors to the land manager/producer. In New Zealand a range of initiatives has been developed and implemented over recent times, whereby land managers are taking increasing responsibility for accounting for the environmental outcomes of their production activities. The range covers the spectrum from voluntary to compulsory (e.g., in order to meet market requirements) and from those initiated by customers to processor and/or producer initiatives. This paper follows the evolution of the principles that drove the predominant activities of the period and the processes that initiated the changes in environmental management. As the focus of agriculturalists changed from pioneering in a new world, to establishing a production base, to economic reality, and finally to environmental responsibility, the processes of extension adapted to meet the new challenge.

  3. Passive Thermal Management for a Fuel Cell Reforming Process

    DTIC Science & Technology

    2006-06-01

    American Institute of Aeronautics and Astronautics 1 PASSIVE THERMAL MANAGEMENT FOR A FUEL CELL REFORMING PROCESS David B. Sarraf * and...REPORT DATE JUN 2006 2. REPORT TYPE 3. DATES COVERED 00-00-2006 to 00-00-2006 4. TITLE AND SUBTITLE Passive Thermal Management for a Fuel Cell

  4. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  5. 76 FR 46774 - Privacy Act of 1974; System of Records-Federal Student Aid Application File

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Information and Regulatory Affairs in the Office of Management and Budget (OMB), on July 21, 2011. This... altered system of records to: Director, Application Processing Division, Program Management Systems...: Director, Application Processing Division, Program Management Systems, Federal Student Aid, U.S. Department...

  6. Rangeland Riparian Systems

    Treesearch

    Wayne Elmore

    1989-01-01

    The management and recovery of degraded riparian systems is a major conservation issue. Presently there are many grazing management strategies being applied based on the name of the technique with little incorporation of basic stream processes. Managers must understand the exact workings of grazing strategies and the individual processes of each stream before...

  7. A Longitudinal Study of Total Quality Management Processes in Business Colleges.

    ERIC Educational Resources Information Center

    Vazzana, Gary; Elfrink, John; Bachmann, Duane P.

    2000-01-01

    Surveys of business school deans in 1995 (n=243) and 1998 (n=151) regarding total quality management (TQM) practices revealed increases in mission and strategy development, goal setting, and use of advisory boards and cross-functional teams. Few are using TQM to manage core learning processes. (SK)

  8. 76 FR 33705 - Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... approach emerges from this process, the Pacific Council may consider a fishery management plan (FMP) amendment process beginning after November 2011 to adopt the approach as a formal conservation objective in... Conservation and Management Act, provided the public has been notified of the intent to take final action to...

  9. Scrapping Patched Computer Systems: Integrated Data Processing for Information Management.

    ERIC Educational Resources Information Center

    Martinson, Linda

    1991-01-01

    Colleges and universities must find a way to streamline and integrate information management processes across the organization. The Georgia Institute of Technology responded to an acute problem of dissimilar operating systems with a campus-wide integrated administrative system using a machine independent relational database management system. (MSE)

  10. 44 CFR 206.37 - Processing requests for declarations of a major disaster or emergency.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Processing requests for declarations of a major disaster or emergency. 206.37 Section 206.37 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE FEDERAL DISASTER...

  11. 44 CFR 206.37 - Processing requests for declarations of a major disaster or emergency.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Processing requests for declarations of a major disaster or emergency. 206.37 Section 206.37 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE FEDERAL DISASTER...

  12. 44 CFR 206.37 - Processing requests for declarations of a major disaster or emergency.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Processing requests for declarations of a major disaster or emergency. 206.37 Section 206.37 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE FEDERAL DISASTER...

  13. 44 CFR 206.37 - Processing requests for declarations of a major disaster or emergency.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Processing requests for declarations of a major disaster or emergency. 206.37 Section 206.37 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE FEDERAL DISASTER...

  14. 49 CFR 1242.83 - Officers-general superintendence; accounting, auditing and finance; management services and data...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Officers-general superintendence; accounting, auditing and finance; management services and data processing; personnel and labor relations; legal and..., auditing and finance; management services and data processing; personnel and labor relations; legal and...

  15. 49 CFR 1242.83 - Officers-general superintendence; accounting, auditing and finance; management services and data...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Officers-general superintendence; accounting, auditing and finance; management services and data processing; personnel and labor relations; legal and..., auditing and finance; management services and data processing; personnel and labor relations; legal and...

  16. 49 CFR 1242.83 - Officers-general superintendence; accounting, auditing and finance; management services and data...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Officers-general superintendence; accounting, auditing and finance; management services and data processing; personnel and labor relations; legal and..., auditing and finance; management services and data processing; personnel and labor relations; legal and...

  17. 49 CFR 1242.83 - Officers-general superintendence; accounting, auditing and finance; management services and data...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Officers-general superintendence; accounting, auditing and finance; management services and data processing; personnel and labor relations; legal and..., auditing and finance; management services and data processing; personnel and labor relations; legal and...

  18. Synthesis of an integrated cockpit management system

    NASA Technical Reports Server (NTRS)

    Dasaro, J. A.; Elliott, C. T.

    1982-01-01

    The process used in the synthesis of an integrated cockpit management system was discussed. Areas covered included flight displays, subsystem management, checklists, and procedures (both normal and emergency). The process of evolving from the unintegrated conventional system to the integrated system is examined and a brief description of the results presented.

  19. A comparative analysis of protected area planning and management frameworks

    Treesearch

    Per Nilsen; Grant Tayler

    1997-01-01

    A comparative analysis of the Recreation Opportunity Spectrum (ROS), Limits of Acceptable Change (LAC), a Process for Visitor Impact Management (VIM), Visitor Experience and Resource Protection (VERP), and the Management Process for Visitor Activities (known as VAMP) decision frameworks examines their origins; methodology; use of factors, indicators, and standards;...

  20. The sage-grouse habitat mortgage: effective conifer management in space and time

    USDA-ARS?s Scientific Manuscript database

    Management of conservation-reliant species can be complicated by the need to manage ecosystem processes that operate at extended temporal horizons. One such process is the role of fire in regulating abundance of expanding conifers that disrupt sage-grouse habitat in the northern Great Basin of the ...

  1. A New Process for Organizing Assessments of Social, Economic, and Environmental Outcomes: Case Study of Wildland Fire Management in the USA

    EPA Science Inventory

    Ecological risk assessments typically are organized using the processes of planning (a discussion among managers, stakeholders, and analysts to clarify ecosystem management goals and assessment scope) and problem formulation (evaluation of existing information to generate hypothe...

  2. Ecosystem management and its role in linking science, policy, and management

    Treesearch

    Matthew Skroch

    2005-01-01

    The scientific community has recently emphasized the importance of ecological process, structure, and scale in the maintenance of biological diversity. Humans have affected most natural landscapes, and many naturally occurring processes, structures, and species may not rebound to naturally sustaining function without intervention. Ecosystem management relies on science...

  3. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  4. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  5. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  6. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  7. Changing Role of the Personnel Manager

    ERIC Educational Resources Information Center

    Schein, Edgar H.

    1975-01-01

    Arguing that the personnel manager will increasingly have to become a change agent and process consultant, the author discusses tasks involved and skills required for the new role. A shift in focus toward top management as the primary client and utilization of more flexible intervention into organizational processes are predicted. (JT)

  8. Managing Dualities in Planned Change Initiatives

    ERIC Educational Resources Information Center

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  9. 44 CFR 206.37 - Processing requests for declarations of a major disaster or emergency.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Processing requests for declarations of a major disaster or emergency. 206.37 Section 206.37 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE FEDERAL DISASTER...

  10. A new process for organizing assessments of social, economic and environmental outcomes: case study of wildland fire management in the U.S.A.

    EPA Science Inventory

    Ecological risk assessments typically are organized using the processes of planning (a discussion among managers, stakeholders and analysis to clarify ecosystem management goals and assessment scope) and problem formulation (evaluation of existing information to generate hypothes...

  11. Certifying leaders? high-quality management practices and healthy organisations: an ISO-9000 based standardisation approach

    PubMed Central

    MONTANO, Diego

    2016-01-01

    The present study proposes a set of quality requirements to management practices by taking into account the empirical evidence on their potential effects on health, the systemic nature of social organisations, and the current conceptualisations of management functions within the framework of comprehensive quality management systems. Systematic reviews and meta-analyses focusing on the associations between leadership and/or supervision and health in occupational settings are evaluated, and the core elements of an ISO 9001 standardisation approach are presented. Six major occupational health requirements to high-quality management practices are identified pertaining to communication processes, organisational justice, role clarity, decision making, social influence processes and management support. It is concluded that the quality of management practices may be improved by developing a quality management system of management practices that ensures not only conformity to product but also to occupational safety and health requirements. Further research may evaluate the practicability of the proposed approach. PMID:26860787

  12. Certifying leaders? high-quality management practices and healthy organisations: an ISO-9000 based standardisation approach.

    PubMed

    Montano, Diego

    2016-08-05

    The present study proposes a set of quality requirements to management practices by taking into account the empirical evidence on their potential effects on health, the systemic nature of social organisations, and the current conceptualisations of management functions within the framework of comprehensive quality management systems. Systematic reviews and meta-analyses focusing on the associations between leadership and/or supervision and health in occupational settings are evaluated, and the core elements of an ISO 9001 standardisation approach are presented. Six major occupational health requirements to high-quality management practices are identified pertaining to communication processes, organisational justice, role clarity, decision making, social influence processes and management support. It is concluded that the quality of management practices may be improved by developing a quality management system of management practices that ensures not only conformity to product but also to occupational safety and health requirements. Further research may evaluate the practicability of the proposed approach.

  13. Service management at CERN with Service-Now

    NASA Astrophysics Data System (ADS)

    Toteva, Z.; Alvarez Alonso, R.; Alvarez Granda, E.; Cheimariou, M.-E.; Fedorko, I.; Hefferman, J.; Lemaitre, S.; Clavo, D. Martin; Martinez Pedreira, P.; Pera Mira, O.

    2012-12-01

    The Information Technology (IT) and the General Services (GS) departments at CERN have decided to combine their extensive experience in support for IT and non-IT services towards a common goal - to bring the services closer to the end user based on Information Technology Infrastructure Library (ITIL) best practice. The collaborative efforts have so far produced definitions for the incident and the request fulfilment processes which are based on a unique two-dimensional service catalogue that combines both the user and the support team views of all services. After an extensive evaluation of the available industrial solutions, Service-now was selected as the tool to implement the CERN Service-Management processes. The initial release of the tool provided an attractive web portal for the users and successfully implemented two basic ITIL processes; the incident management and the request fulfilment processes. It also integrated with the CERN personnel databases and the LHC GRID ticketing system. Subsequent releases continued to integrate with other third-party tools like the facility management systems of CERN as well as to implement new processes such as change management. Independently from those new development activities it was decided to simplify the request fulfilment process in order to achieve easier acceptance by the CERN user community. We believe that due to the high modularity of the Service-now tool, the parallel design of ITIL processes e.g., event management and non-ITIL processes, e.g., computer centre hardware management, will be easily achieved. This presentation will describe the experience that we have acquired and the techniques that were followed to achieve the CERN customization of the Service-Now tool.

  14. GWM-VI: groundwater management with parallel processing for multiple MODFLOW versions

    USGS Publications Warehouse

    Banta, Edward R.; Ahlfeld, David P.

    2013-01-01

    Groundwater Management–Version Independent (GWM–VI) is a new version of the Groundwater Management Process of MODFLOW. The Groundwater Management Process couples groundwater-flow simulation with a capability to optimize stresses on the simulated aquifer based on an objective function and constraints imposed on stresses and aquifer state. GWM–VI extends prior versions of Groundwater Management in two significant ways—(1) it can be used with any version of MODFLOW that meets certain requirements on input and output, and (2) it is structured to allow parallel processing of the repeated runs of the MODFLOW model that are required to solve the optimization problem. GWM–VI uses the same input structure for files that describe the management problem as that used by prior versions of Groundwater Management. GWM–VI requires only minor changes to the input files used by the MODFLOW model. GWM–VI uses the Joint Universal Parameter IdenTification and Evaluation of Reliability Application Programming Interface (JUPITER-API) to implement both version independence and parallel processing. GWM–VI communicates with the MODFLOW model by manipulating certain input files and interpreting results from the MODFLOW listing file and binary output files. Nearly all capabilities of prior versions of Groundwater Management are available in GWM–VI. GWM–VI has been tested with MODFLOW-2005, MODFLOW-NWT (a Newton formulation for MODFLOW-2005), MF2005-FMP2 (the Farm Process for MODFLOW-2005), SEAWAT, and CFP (Conduit Flow Process for MODFLOW-2005). This report provides sample problems that demonstrate a range of applications of GWM–VI and the directory structure and input information required to use the parallel-processing capability.

  15. Exploring the effect of at-risk case management compensation on hospital pay-for-performance outcomes: tools for change.

    PubMed

    Granata, Randy L; Hamilton, Karen

    2015-01-01

    Acute care nurse case managers are charged with compliance oversight, managing throughput, and ensuring safe care transitions. Leveraging the roles of nurse case managers and social workers during care transitions translates into improved fiscal performance under the Affordable Care Act. This article aims to equip leaders in the field of case management with tools to facilitate the alignment of case management systems with hospital pay-for-performance measures. A quality improvement project was implemented at a hospital in south Alabama to examine the question: for acute care case managers, what is the effect of key performance indictors using an at-risk compensation model in comparison to past nonincentive models on hospital readmissions, lengths of stay, and patient satisfaction surrounding the discharge process. Inpatient acute care hospital. The implementation of an at-risk compensation model using key performance indicators, Lean Six Sigma methodology, and Creative Health Care Management's Relationship-Based Care framework demonstrated reduced length of stay, hospital readmissions, and improved patient experiences. Regulatory changes and new models of reimbursement in the acute care environment have created the perfect storm for case management leaders. Hospital fiscal performance is dependent on effective case management processes and the ability to optimize scarce resources. The quality improvement project aimed to further align case management systems and structures with hospital pay-for-performance measures. Tools for change were presented to assist leaders with the change acceleration process.

  16. New Tools and Methods for Assessing Risk-Management Strategies

    DTIC Science & Technology

    2004-03-01

    Theories to evaluate the risks and benefits of various acquisition alternatives and allowed researchers to monitor the process students used to make a...revealed distinct risk-management strategies. 15. SUBJECT TERMS risk managements, acquisition process, expected value theory , multi-attribute utility theory ...Utility Theories to evaluate the risks and benefits of various acquisition alternatives, and allowed us to monitor the process subjects used to arrive at

  17. 30 CFR 285.612 - How will my SAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false How will my SAP be processed for Federal consistency under the Coastal Zone Management Act? 285.612 Section 285.612 Mineral Resources BUREAU OF OCEAN... the Coastal Zone Management Act? Your SAP will be processed based on how your commercial lease was...

  18. 30 CFR 285.647 - How will my GAP be processed for Federal consistency under the Coastal Zone Management Act?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false How will my GAP be processed for Federal consistency under the Coastal Zone Management Act? 285.647 Section 285.647 Mineral Resources BUREAU OF OCEAN... under the Coastal Zone Management Act? Your GAP will be processed based on how your limited lease, ROW...

  19. Issues in the Medication Management Process in People Who Have Intellectual and Developmental Disabilities: A Qualitative Study of the Caregivers' Perspective

    ERIC Educational Resources Information Center

    Erickson, Steven R.; Salgado, Teresa M.; Tian, Xi

    2016-01-01

    People who have intellectual and developmental disabilities (IDD) often rely on caregivers to assist in the medication management process. The aim of this study was to learn from caregivers, who are either family or support staff, what major issues arise throughout the process of managing medication and how these might be addressed. Problems…

  20. An Integrated Information System for Supporting Quality Management Tasks

    NASA Astrophysics Data System (ADS)

    Beyer, N.; Helmreich, W.

    2004-08-01

    In a competitive environment, well defined processes become the strategic advantage of a company. Hence, targeted Quality Management ensures efficiency, trans- parency and, ultimately, customer satisfaction. In the particular context of a Space Test Centre, a num- ber of specific Quality Management standards have to be applied. According to the revision of ISO 9001 dur- ing 2000, and due to the adaptation of ECSS-Q20-07, process orientation and data analysis are key tasks for ensuring and evaluating the efficiency of a company's processes. In line with these requirements, an integrated management system for accessing the necessary infor- mation to support Quality Management and other proc- esses has been established. Some of its test-related fea- tures are presented here. Easy access to the integrated management system from any work place at IABG's Space Test Centre is ensured by means of an intranet portal. It comprises a full set of quality-related process descriptions, information on test facilities, emergency procedures, and other relevant in- formation. The portal's web interface provides direct access to a couple of external applications. Moreover, easy updating of all information and low cost mainte- nance are features of this integrated information system. The timely and transparent management of non- conformances is covered by a dedicated NCR database which incorporates full documentation capability, elec- tronic signature and e-mail notification of concerned staff. A search interface allows for queries across all documented non-conformances. Furthermore, print ver- sions can be generated at any stage in the process, e.g. for distribution to customers. Feedback on customer satisfaction is sought through a web-based questionnaire. The process is initiated by the responsible test manager through submission of an e- mail that contains a hyperlink to a secure website, ask- ing the customer to complete the brief online form, which is directly fed to a database for subsequent evaluation by the Quality Manager. All such information can be processed and presented in an appropriate manner for internal or external audits, as well as for regular management reviews.

  1. Service management: New Zealand's model of resource management.

    PubMed

    Malcolm, L

    1990-12-01

    The health system in New Zealand, which in many respects is similar to that of the United Kingdom NHS, is currently undergoing massive change. In 1989 fourteen area health boards were formed, each board being accountable to the minister of health for achieving health goals and providing comprehensive health services for its defined population. This process has been assisted by the promulgation of a set of national health goals and a national health charter. Within area health boards the principle of general management is being implemented. Organisational structures are moving away from hospitals to services in a process which is being called service management which may be defined as the decentralisation of general management to the clinical workface. Similar in many respects to the resource management initiatives in the NHS it brings together medical, nursing and business management at the operational level with one person being accountable for the achievement of quality of care objectives within a budgetary framework. Budgetary restraints in excess of 10% have been achieved in the last 12 months partly through the service management process. Service management is seen to be a major paradigm shift in health services organisation and could be of international significance in its potential for achieving medical accountability for cost containment and quality assurance, and for coordinating care across agency and disciplinary boundaries.

  2. Developing a Three Processes Framework to Analyze Hydrologic Performance of Urban Stormwater Management in a Watershed Scale

    NASA Astrophysics Data System (ADS)

    Lyu, H.; Ni, G.; Sun, T.

    2016-12-01

    Urban stormwater management contributes to recover water cycle to a nearly natural situation. It is a challenge for analyzing the hydrologic performance in a watershed scale, since the measures are various of sorts and scales and work in different processes. A three processes framework is developed to simplify the urban hydrologic process on the surface and evaluate the urban stormwater management. The three processes include source utilization, transfer regulation and terminal detention, by which the stormwater is controlled in order or discharged. Methods for analyzing performance are based on the water controlled proportions by each process, which are calculated using USEPA Stormwater Management Model. A case study form Beijing is used to illustrate how the performance varies under a set of designed events of different return periods. This framework provides a method to assess urban stormwater management as a whole system considering the interaction between measures, and to examine if there is any weak process of an urban watershed to be improved. The results help to make better solutions of urban water crisis.

  3. Design and practice of a comprehensively functional integrated management information system for major construction

    NASA Astrophysics Data System (ADS)

    Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan

    2017-08-01

    This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the design of syllabus is reasonable or not. The Management Information System changes the management object from the education results to the entire education processes. And it improves the efficiency of the management. It provides an effective method to promote curriculum construction management by supervision and evaluation, which improves students' learning outcomes and the quality of curriculums. As a result, it promotes the quality system of education obviously.

  4. Assessing and managing multiple risks in a changing world-The Roskilde recommendations.

    PubMed

    Selck, Henriette; Adamsen, Peter B; Backhaus, Thomas; Banta, Gary T; Bruce, Peter K H; Burton, G Allen; Butts, Michael B; Boegh, Eva; Clague, John J; Dinh, Khuong V; Doorn, Neelke; Gunnarsson, Jonas S; Hauggaard-Nielsen, Henrik; Hazlerigg, Charles; Hunka, Agnieszka D; Jensen, John; Lin, Yan; Loureiro, Susana; Miraglia, Simona; Munns, Wayne R; Nadim, Farrokh; Palmqvist, Annemette; Rämö, Robert A; Seaby, Lauren P; Syberg, Kristian; Tangaa, Stine R; Thit, Amalie; Windfeld, Ronja; Zalewski, Maciej; Chapman, Peter M

    2017-01-01

    Roskilde University (Denmark) hosted a November 2015 workshop, Environmental Risk-Assessing and Managing Multiple Risks in a Changing World. This Focus article presents the consensus recommendations of 30 attendees from 9 countries regarding implementation of a common currency (ecosystem services) for holistic environmental risk assessment and management; improvements to risk assessment and management in a complex, human-modified, and changing world; appropriate development of protection goals in a 2-stage process; dealing with societal issues; risk-management information needs; conducting risk assessment of risk management; and development of adaptive and flexible regulatory systems. The authors encourage both cross-disciplinary and interdisciplinary approaches to address their 10 recommendations: 1) adopt ecosystem services as a common currency for risk assessment and management; 2) consider cumulative stressors (chemical and nonchemical) and determine which dominate to best manage and restore ecosystem services; 3) fully integrate risk managers and communities of interest into the risk-assessment process; 4) fully integrate risk assessors and communities of interest into the risk-management process; 5) consider socioeconomics and increased transparency in both risk assessment and risk management; 6) recognize the ethical rights of humans and ecosystems to an adequate level of protection; 7) determine relevant reference conditions and the proper ecological context for assessments in human-modified systems; 8) assess risks and benefits to humans and the ecosystem and consider unintended consequences of management actions; 9) avoid excessive conservatism or possible underprotection resulting from sole reliance on binary, numerical benchmarks; and 10) develop adaptive risk-management and regulatory goals based on ranges of uncertainty. Environ Toxicol Chem 2017;36:7-16. © 2016 SETAC. © 2016 SETAC.

  5. Incident management successful practices : a cross-cutting study : improving mobility and saving lives

    DOT National Transportation Integrated Search

    2000-04-01

    Incident management is the process of managing multi-agency, multi-jurisdictional responses to highway traffic disruptions. Efficient and coordinated management of incidents reduces their adverse impacts on public safety, traffic conditions, and the ...

  6. Steve Nixon | NREL

    Science.gov Websites

    NREL. Steve has an extensive background in facilities engineering, facilities management, and Energy Manager, and a Project Management Professional. Prior to joining NREL, Steve was the Facilities manufacturing engineering, business application programming, and business process management positions

  7. 43 CFR 3922.10 - Application processing fee.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL SHALE LEASING Application Processing... process for a competitive oil shale lease is as follows: (1) The applicant nominating the tract for...

  8. 43 CFR 3922.10 - Application processing fee.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR RANGE MANAGEMENT (4000) OIL SHALE LEASING Application Processing... process for a competitive oil shale lease is as follows: (1) The applicant nominating the tract for...

  9. 43 CFR 3922.10 - Application processing fee.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL SHALE LEASING Application Processing... process for a competitive oil shale lease is as follows: (1) The applicant nominating the tract for...

  10. 43 CFR 3922.10 - Application processing fee.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) OIL SHALE LEASING Application Processing... process for a competitive oil shale lease is as follows: (1) The applicant nominating the tract for...

  11. [Application of supply chain integration management of medical consumables].

    PubMed

    Zhang, Jian

    2013-07-01

    This paper introduces the background, the content, the information management system of material supply chain integration management and the consumables management process. The system helps to expand the selection of hospital supplies varieties, to reduce consumables management costs, to improve the efficiency of supplies, to ensure supplies safety, reliability and traceability.

  12. 44 CFR 204.25 - FEMA-State agreement for fire management assistance grant program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GRANT PROGRAM Declaration Process § 204.25 FEMA-State agreement for fire management assistance grant... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false FEMA-State agreement for fire management assistance grant program. 204.25 Section 204.25 Emergency Management and Assistance FEDERAL...

  13. 44 CFR 204.25 - FEMA-State agreement for fire management assistance grant program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... GRANT PROGRAM Declaration Process § 204.25 FEMA-State agreement for fire management assistance grant... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false FEMA-State agreement for fire management assistance grant program. 204.25 Section 204.25 Emergency Management and Assistance FEDERAL...

  14. 44 CFR 204.25 - FEMA-State agreement for fire management assistance grant program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GRANT PROGRAM Declaration Process § 204.25 FEMA-State agreement for fire management assistance grant... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false FEMA-State agreement for fire management assistance grant program. 204.25 Section 204.25 Emergency Management and Assistance FEDERAL...

  15. 44 CFR 204.25 - FEMA-State agreement for fire management assistance grant program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... GRANT PROGRAM Declaration Process § 204.25 FEMA-State agreement for fire management assistance grant... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true FEMA-State agreement for fire management assistance grant program. 204.25 Section 204.25 Emergency Management and Assistance FEDERAL...

  16. 44 CFR 204.25 - FEMA-State agreement for fire management assistance grant program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... GRANT PROGRAM Declaration Process § 204.25 FEMA-State agreement for fire management assistance grant... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false FEMA-State agreement for fire management assistance grant program. 204.25 Section 204.25 Emergency Management and Assistance FEDERAL...

  17. Knowledge Management in Preserving Ecosystems: The Case of Seoul

    ERIC Educational Resources Information Center

    Lee, Jeongseok

    2009-01-01

    This study explores the utility of employing knowledge management as a framework for understanding how public managers perform ecosystem management. It applies the grounded theory method to build a model. The model is generated by applying the concept of knowledge process to an investigation of how the urban ecosystem is publicly managed by civil…

  18. Total Quality Management and Organizational Behavior Management: An Integration for Continual Improvement.

    ERIC Educational Resources Information Center

    Mawhinney, Thomas C.

    1992-01-01

    The history and main features of organizational behavior management (OBM) are compared and integrated with those of total quality management (TQM), with emphasis on W.E. Deming's 14 points and OBM's operant-based approach to performance management. Interventions combining OBM, TQM, and statistical process control are recommended. (DB)

  19. 40 CFR 430.03 - Best management practices (BMPs) for spent pulping liquor, soap, and turpentine management, spill...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... spent pulping liquor, soap, and turpentine management, spill prevention, and control. 430.03 Section 430... management practices (BMPs) for spent pulping liquor, soap, and turpentine management, spill prevention, and... Liquor, Soap, and Turpentine Service: Any process vessel, storage tank, pumping system, evaporator, heat...

  20. 40 CFR 430.03 - Best management practices (BMPs) for spent pulping liquor, soap, and turpentine management, spill...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... spent pulping liquor, soap, and turpentine management, spill prevention, and control. 430.03 Section 430... management practices (BMPs) for spent pulping liquor, soap, and turpentine management, spill prevention, and... Liquor, Soap, and Turpentine Service: Any process vessel, storage tank, pumping system, evaporator, heat...

  1. Progress on the Journey to Total Quality Management: Using the Myers-Briggs Type Indicator and the Adjective Check List in Management Development.

    ERIC Educational Resources Information Center

    Mani, Bonnie G.

    1995-01-01

    In an Internal Revenue Service office using total quality management (TQM), the management development program uses Myers Briggs Type Indicator and Adjective Check List for manager self-assessment. Because management commitment is essential to TQM, the process is a way of enhancing leadership skills and demonstrating appreciation of diversity. (SK)

  2. A Proactive and Top-Down Approach to Managing Risk at NASA

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon

    2010-01-01

    Our ultimate goal is to manage risk in a holistic and coherent fashion across the Agency: a) The RIDM process is intended to risk-inform direction-setting decisions. c) The CRM process is intended to manage risk associated with the implementation of baseline performance requirements. Currently we are working on: a) Enhancements to the CRM process. b) Better integration of the RIDM and CRM processes. c) Better integration of institutional risk considerations into RM framework.

  3. A whole process quality control system for energy measuring instruments inspection based on IOT technology

    NASA Astrophysics Data System (ADS)

    Yin, Bo; Liu, Li; Wang, Jiahan; Li, Xiran; Liu, Zhenbo; Li, Dewei; Wang, Jun; Liu, Lu; Wu, Jun; Xu, Tingting; Cui, He

    2017-10-01

    Electric energy measurement as a basic work, an accurate measurements play a vital role for the economic interests of both parties of power supply, the standardized management of the measurement laboratory at all levels is a direct factor that directly affects the fairness of measurement. Currently, the management of metering laboratories generally uses one-dimensional bar code as the recognition object, advances the testing process by manual management, most of the test data requires human input to generate reports. There are many problems and potential risks in this process: Data cannot be saved completely, cannot trace the status of inspection, the inspection process isn't completely controllable and so on. For the provincial metrology center's actual requirements of the whole process management for the performance test of the power measuring appliances, using of large-capacity RF tags as a process management information media, we developed a set of general measurement experiment management system, formulated a standardized full performance test process, improved the raw data recording mode of experimental process, developed a storehouse automatic inventory device, established a strict test sample transfer and storage system, ensured that all the raw data of the inspection can be traced back, achieved full life-cycle control of the sample, significantly improved the quality control level and the effectiveness of inspection work.

  4. 7 Processes that Enable NASA Software Engineering Technologies: Value-Added Process Engineering

    NASA Technical Reports Server (NTRS)

    Housch, Helen; Godfrey, Sally

    2011-01-01

    The presentation reviews Agency process requirements and the purpose, benefits, and experiences or seven software engineering processes. The processes include: product integration, configuration management, verification, software assurance, measurement and analysis, requirements management, and planning and monitoring.

  5. Resource Management Scheme Based on Ubiquitous Data Analysis

    PubMed Central

    Lee, Heung Ki; Jung, Jaehee

    2014-01-01

    Resource management of the main memory and process handler is critical to enhancing the system performance of a web server. Owing to the transaction delay time that affects incoming requests from web clients, web server systems utilize several web processes to anticipate future requests. This procedure is able to decrease the web generation time because there are enough processes to handle the incoming requests from web browsers. However, inefficient process management results in low service quality for the web server system. Proper pregenerated process mechanisms are required for dealing with the clients' requests. Unfortunately, it is difficult to predict how many requests a web server system is going to receive. If a web server system builds too many web processes, it wastes a considerable amount of memory space, and thus performance is reduced. We propose an adaptive web process manager scheme based on the analysis of web log mining. In the proposed scheme, the number of web processes is controlled through prediction of incoming requests, and accordingly, the web process management scheme consumes the least possible web transaction resources. In experiments, real web trace data were used to prove the improved performance of the proposed scheme. PMID:25197692

  6. Decision-making process related to treatment and management in Korean women with breast cancer: Finding the right individualized healthcare trajectory.

    PubMed

    Kim, Kkotbong; Yang, Jinhyang

    2017-06-01

    After being diagnosed with breast cancer, women must make a number of decisions about their treatment and management. When the decision-making process among breast cancer patients is ineffective, it results in harm to their health. Little is known about the decision-making process of breast cancer patients during the entire course of treatment and management. We investigated women with breast cancer to explore the decision-making processes related to treatment and management. Eleven women participated, all of whom were receiving treatment or management in Korea. The average participant age was 43.5years. For data collection and analysis, a grounded theory methodology was used. Through constant comparative analyses, a core category emerged that we referred to as "finding the right individualized healthcare trajectory." The decision-making process occurred in four phases: turmoil, exploration, balance, and control. The turmoil phase included weighing the credibility of information and lowering the anxiety level. The exploration phase included assessing the expertise/promptness of medical treatment and evaluating the effectiveness of follow-up management. The balance phase included performing analyses from multiple angles and rediscovering value as a human being. The control phase included constructing an individualized management system and following prescribed and other management options. It is important to provide patients with accurate information related to the treatment and management of breast cancer so that they can make effective decisions. Healthcare providers should engage with patients on issues related to their disease, understand the burden placed on patients because of issues related to their sex, and ensure that the patient has a sufficient support system. The results of this study can be used to develop phase-specific, patient-centered, and tailored interventions for breast cancer patients. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Assessment of reservoir system variable forecasts

    NASA Astrophysics Data System (ADS)

    Kistenmacher, Martin; Georgakakos, Aris P.

    2015-05-01

    Forecast ensembles are a convenient means to model water resources uncertainties and to inform planning and management processes. For multipurpose reservoir systems, forecast types include (i) forecasts of upcoming inflows and (ii) forecasts of system variables and outputs such as reservoir levels, releases, flood damage risks, hydropower production, water supply withdrawals, water quality conditions, navigation opportunities, and environmental flows, among others. Forecasts of system variables and outputs are conditional on forecasted inflows as well as on specific management policies and can provide useful information for decision-making processes. Unlike inflow forecasts (in ensemble or other forms), which have been the subject of many previous studies, reservoir system variable and output forecasts are not formally assessed in water resources management theory or practice. This article addresses this gap and develops methods to rectify potential reservoir system forecast inconsistencies and improve the quality of management-relevant information provided to stakeholders and managers. The overarching conclusion is that system variable and output forecast consistency is critical for robust reservoir management and needs to be routinely assessed for any management model used to inform planning and management processes. The above are demonstrated through an application from the Sacramento-American-San Joaquin reservoir system in northern California.

  8. Forecasting the effects of land-use and climate change on wildlife communities and habitats in the lower Mississippi Valley

    USGS Publications Warehouse

    Faulkner, Stephen P.

    2010-01-01

    Landscape patterns and processes reflect both natural ecosystem attributes and the policy and management decisions of individual Federal, State, county, and private organizations. Land-use regulation, water management, and habitat conservation and restoration efforts increasingly rely on landscape-level approaches that incorporate scientific information into the decision-making process. Since management actions are implemented to affect future conditions, decision-support models are necessary to forecast potential future conditions resulting from these decisions. Spatially explicit modeling approaches enable testing of different scenarios and help evaluate potential outcomes of management actions in conjunction with natural processes such as climate change. The ability to forecast the effects of changing land use and climate is critically important to land and resource managers since their work is inherently site specific, yet conservation strategies and practices are expressed at higher spatial and temporal scales that must be considered in the decisionmaking process.

  9. Compound management beyond efficiency.

    PubMed

    Burr, Ian; Winchester, Toby; Keighley, Wilma; Sewing, Andreas

    2009-06-01

    Codeveloping alongside chemistry and in vitro screening, compound management was one of the first areas in research recognizing the need for efficient processes and workflows. Material management groups have centralized, automated, miniaturized and, importantly, found out what not to do with compounds. While driving down cost and improving quality in storage and processing, researchers still face the challenge of interfacing optimally with changing business processes, in screening groups, and with external vendors and focusing on biologicals in many companies. Here we review our strategy to provide a seamless link between compound acquisition and screening operations and the impact of material management on quality of the downstream processes. Although this is driven in part by new technologies and improved quality control within material management, redefining team structures and roles also drives job satisfaction and motivation in our teams with a subsequent positive impact on cycle times and customer feedback.

  10. Contingency Management and Deliberative Decision-Making Processes.

    PubMed

    Regier, Paul S; Redish, A David

    2015-01-01

    Contingency management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of contingency management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that contingency management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by contingency management, and suggests improvements in its implementation.

  11. Contingency Management and Deliberative Decision-Making Processes

    PubMed Central

    Regier, Paul S.; Redish, A. David

    2015-01-01

    Contingency management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of contingency management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that contingency management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by contingency management, and suggests improvements in its implementation. PMID:26082725

  12. A Model for Effective Performance in the Indonesian Navy.

    DTIC Science & Technology

    1987-06-01

    Navy LMET I AWBRAC’ (COAGAU0 OAl reVerie of necoiuary and .dfmtk by block num"ber) 7,- This thesis describes a process of designing a management ...effective from ineffective manager . In the process of building the model two main steps are taken. First, a literature study of the empirical analysis of... management competencies was conducted to identify management competencies in the United States in general and the U.S. Navy in particular. Second, a

  13. The Requirement for Acquisition and Logistics Integration: An Examination of Reliability Management Within the Marine Corps Acquisition Process

    DTIC Science & Technology

    2002-12-01

    HMMWV family of vehicles, LVS family of vehicles, and the M198 Howitzer). The analysis is limited to an assessment of reliability management issues...AND LOGISTICS INTEGRATION: AN EXAMINATION OF RELIABILITY MANAGEMENT WITHIN THE MARINE CORPS ACQUISITION PROCESS by Marvin L. Norcross, Jr...Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction

  14. National Aeronautics and Space Administration: An Approach for Meeting Customer Standards Under Executive Order 12862.

    DTIC Science & Technology

    1994-05-01

    LOGISTICS MANAGEMENT INSTITUTE An Approach for Meeting Customer Standards Under Executive Order 12862 Summary Executive Order 12862, Setting...search Centers all operate and manage wind tunnels for both NASA and indus- try customers . Nonetheless, a separate wind-tunnel process should be...could include the man- ager of the process, selected members of the manager’s staff, a key customer , and a survey expert. The manager and staff would

  15. Improvement of hospital processes through business process management in Qaem Teaching Hospital: A work in progress.

    PubMed

    Yarmohammadian, Mohammad H; Ebrahimipour, Hossein; Doosty, Farzaneh

    2014-01-01

    In a world of continuously changing business environments, organizations have no option; however, to deal with such a big level of transformation in order to adjust the consequential demands. Therefore, many companies need to continually improve and review their processes to maintain their competitive advantages in an uncertain environment. Meeting these challenges requires implementing the most efficient possible business processes, geared to the needs of the industry and market segments that the organization serves globally. In the last 10 years, total quality management, business process reengineering, and business process management (BPM) have been some of the management tools applied by organizations to increase business competiveness. This paper is an original article that presents implementation of "BPM" approach in the healthcare domain that allows an organization to improve and review its critical business processes. This project was performed in "Qaem Teaching Hospital" in Mashhad city, Iran and consists of four distinct steps; (1) identify business processes, (2) document the process, (3) analyze and measure the process, and (4) improve the process. Implementing BPM in Qaem Teaching Hospital changed the nature of management by allowing the organization to avoid the complexity of disparate, soloed systems. BPM instead enabled the organization to focus on business processes at a higher level.

  16. From Process to Product: Your Risk Process at Work

    NASA Technical Reports Server (NTRS)

    Kundrot, Craig E.; Fogarty, Jenifer; Charles, John; Buquo, Lynn; Sibonga, Jean; Alexander, David; Horn, Wayne G.; Edwards, J. Michelle

    2010-01-01

    The Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) at the NASA/Johnson Space Center work together to address and manage the human health and performance risks associated with human space flight. This includes all human system requirements before, during, and after space flight, providing for research, and managing the risk of adverse long-term health outcomes for the crew. We previously described the framework and processes developed for identifying and managing these human system risks. The focus of this panel is to demonstrate how the implementation of the framework and associated processes has provided guidance in the management and communication of human system risks. The risks of early onset osteoporosis, CO2 exposure, and intracranial hypertension in particular have all benefitted from the processes developed for human system risk management. Moreover, we are continuing to develop capabilities, particularly in the area of information architecture, which will also be described. We are working to create a system whereby all risks and associated actions can be tracked and related to one another electronically. Such a system will enhance the management and communication capabilities for the human system risks, thereby increasing the benefit to researchers and flight surgeons.

  17. Management Styles and Techniques: People.

    ERIC Educational Resources Information Center

    DeLoach, Marva L.; And Others

    1987-01-01

    Three articles discuss management of library technical processes personnel. The first article focuses on the employer employee relationship and communication; the second explores management trends, including participative decision making, personnel evaluation, management by objectives, and the collegial system; and the third focuses on the…

  18. Ecological Principles for Invasive Plant Management

    USDA-ARS?s Scientific Manuscript database

    Invasive annual grasses continue to advance at an alarming rate despite efforts of control by land managers. Ecologically-based invasive plant management (EBIPM) is a holistic framework that integrates ecosystem health assessment, knowledge of ecological processes and adaptive management into a succ...

  19. 76 FR 79565 - Management Contracts-Background Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Management Contracts--Background Investigations AGENCY: National Indian Gaming Commission. ACTION: Notice of... investigation process required for management contracts. The proposed revision may reduce duplication of efforts... to clarify that a management contractor should be required to submit background information when the...

  20. Why Rules Matter in Complex Event Processing...and Vice Versa

    NASA Astrophysics Data System (ADS)

    Vincent, Paul

    Many commercial and research CEP solutions are moving beyond simple stream query languages to more complete definitions of "process" and thence to "decisions" and "actions". And as capabilities increase in event processing capabilities, there is an increasing realization that the humble "rule" is as relevant to the event cloud as it is to specific services. Less obvious is how much event processing has to offer the process and rule execution and management technologies. Does event processing change the way we should manage businesses, processes and services, together with their embedded (and hopefully managed) rulesets?

  1. Application of SNMP on CATV

    NASA Astrophysics Data System (ADS)

    Huang, Hong-bin; Liu, Wei-ping; Chen, Shun-er; Zheng, Liming

    2005-02-01

    A new type of CATV network management system developed by universal MCU, which supports SNMP, is proposed in this paper. From the point of view in both hardware and software, the function and method of every modules inside the system, which include communications in the physical layer, protocol process, data process, and etc, are analyzed. In our design, the management system takes IP MAN as data transmission channel and every controlled object in the management structure has a SNMP agent. In the SNMP agent developed, there are four function modules, including physical layer communication module, protocol process module, internal data process module and MIB management module. In the paper, the structure and function of every module are designed and demonstrated while the related hardware circuit, software flow as well as the experimental results are tested. Furthermore, by introducing RTOS into the software programming, the universal MCU procedure can conducts such multi-thread management as fast Ethernet controller driving, TCP/IP process, serial port signal monitoring and so on, which greatly improves efficiency of CPU.

  2. CERES AuTomAted job Loading SYSTem (CATALYST): An automated workflow manager for satellite data production

    NASA Astrophysics Data System (ADS)

    Gleason, J. L.; Hillyer, T. N.; Wilkins, J.

    2012-12-01

    The CERES Science Team integrates data from 5 CERES instruments onboard the Terra, Aqua and NPP missions. The processing chain fuses CERES observations with data from 19 other unique sources. The addition of CERES Flight Model 5 (FM5) onboard NPP, coupled with ground processing system upgrades further emphasizes the need for an automated job-submission utility to manage multiple processing streams concurrently. The operator-driven, legacy-processing approach relied on manually staging data from magnetic tape to limited spinning disk attached to a shared memory architecture system. The migration of CERES production code to a distributed, cluster computing environment with approximately one petabyte of spinning disk containing all precursor input data products facilitates the development of a CERES-specific, automated workflow manager. In the cluster environment, I/O is the primary system resource in contention across jobs. Therefore, system load can be maximized with a throttling workload manager. This poster discusses a Java and Perl implementation of an automated job management tool tailored for CERES processing.

  3. Management: A continuing literature survey with indexes, March 1976

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Management is a compilation of references to selected reports, journal articles, and other documents on the subject of management. This publication lists 368 documents originally announced in the 1975 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). It includes references on the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. It also includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.

  4. Resource Management for Distributed Parallel Systems

    NASA Technical Reports Server (NTRS)

    Neuman, B. Clifford; Rao, Santosh

    1993-01-01

    Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.

  5. Managing Conflict with Peers. An Ideas Into Action Guidebook.

    ERIC Educational Resources Information Center

    Cartwright, Talula

    This short publication provides a process for managing conflict among managerial peers. It focuses more on conflicts among managers that involve personal values, office politics, power struggles, and emotional reactions than on conflicts that arise from incompatible goals or from different views on how to accomplish a task. The process described…

  6. Project Management, Critical Praxis, and Process-Oriented Approach to Teamwork

    ERIC Educational Resources Information Center

    Ding, Huiling; Ding, Xin

    2008-01-01

    To help alleviate issues of free-riding and conflicts in team projects, this study proposes the systematic incorporation of project management methods to introduce a process-oriented approach to and a critical praxis in team projects. We examined how the systematic use of project management methods influenced students' performance in team…

  7. Supply Operations (DLA-O) Total Quality Management (TQM) Master Plan

    DTIC Science & Technology

    1989-07-01

    This document briefly outlines the DLA Directorate of Supply Operations plan to implement total quality management . It seeks to provide better...service to customers at a lower cost through continuous process improvement and commitment from everyone in the organization. Keywords: TQM (total Quality Management ), Supply operations; Continuous process improvement. (KR)

  8. Validation of a Turkish Version of the Profiles of Organizational Influence Strategies

    ERIC Educational Resources Information Center

    Cetin, Saadet Kuru; Cinkir, Sakir

    2016-01-01

    Influencing others is at the heart of the management process. Managers use the influencing process for the purposes of controlling workers, using limited sources, implementing organizational change, breaking down the resistance of workers to this change, and enhancing the performance of workers of different from the managers' backgrounds. This…

  9. Developing and Managing University-Industry Research Collaborations through a Process Methodology/Industrial Sector Approach

    ERIC Educational Resources Information Center

    Philbin, Simon P.

    2010-01-01

    A management framework has been successfully utilized at Imperial College London in the United Kingdom to improve the process for developing and managing university-industry research collaborations. The framework has been part of a systematic approach to increase the level of research contracts from industrial sources, to strengthen the…

  10. Introduction to the Management Process (NS 222): Competency-Based Course Syllabus.

    ERIC Educational Resources Information Center

    Brady, Marilyn H.

    "Introduction to the Management Process" (NS 222) is an associate degree nursing course offered at Chattanooga State Technical Community College to introduce students to basic management concepts, methods of nursing care delivery, patient classification systems, and methods of enacting change and working as a change agent. Upon completion of the…

  11. 76 FR 24911 - Notice of Submission of Proposed Information Collection to OMB; Public Housing Assessment System...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ... submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction... found through the PHAS assessment process (management, financial, physical, or resident related) and any... in a PHA's operations found through the PHAS assessment process (management, financial, physical, or...

  12. 20 CFR 663.510 - Who is responsible for managing the eligible provider process?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Who is responsible for managing the eligible provider process? 663.510 Section 663.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... INVESTMENT ACT Eligible Training Providers § 663.510 Who is responsible for managing the eligible provider...

  13. Applying Fourth Generation Management to Access Services: Reinventing Customer Service and Process Management

    ERIC Educational Resources Information Center

    Hasty, Douglas F.

    2004-01-01

    Are librarians doing all they can to ensure that customer services are delivered with the customer in mind? Librarians are great at helping, but we sometimes need help with identifying customers, defining their needs, developing services, and reviewing the processes behind the services. Fourth Generation Management provides new insight for…

  14. Winning performance improvement strategies--linking documentation and accounts receivable.

    PubMed

    Braden, J H; Swadley, D

    1996-01-01

    When the HIM department at The University of Texas Medical Branch set out to improve documentation and accounts receivable management, it established a plan that encompassed a broad spectrum of data management process changes. The department examined and acknowledged the deficiencies in data management processes and used performance improvement tools to achieve successful results.

  15. An Ontology and a Software Framework for Competency Modeling and Management

    ERIC Educational Resources Information Center

    Paquette, Gilbert

    2007-01-01

    The importance given to competency management is well justified. Acquiring new competencies is the central goal of any education or knowledge management process. Thus, it must be embedded in any software framework as an instructional engineering tool, to inform the runtime environment of the knowledge that is processed by actors, and their…

  16. Beyond the Rational: The Strategic Management Process, Cultural Change and Post-Incorporation Further Education.

    ERIC Educational Resources Information Center

    Watson, George; Crossley, Michael

    2001-01-01

    Examines the introduction and evolution of the Strategic Management Process in England's further education sector. Critiques the transfer of business-sector management models to postsecondary education, reviews related policy literature, and summarizes a detailed longitudinal study of cultural change in one college embarking upon incorporation.…

  17. Administrators in Action--Managing Public Monies and Processing Emotion in School Activities: A Teaching Case Study

    ERIC Educational Resources Information Center

    Tenuto, Penny L.; Gardiner, Mary E.; Yamamoto, Julie K.

    2015-01-01

    This teaching case describes school administrators in action performing day-to-day leadership tasks, managing public funds in school activities, and interacting with others appropriately. The case focuses on administrative challenges in handling and managing school activity funds. A method for processing emotion is discussed to assist…

  18. The Management-Business Process: Cultural Considerations.

    ERIC Educational Resources Information Center

    Ruiz, Reynaldo

    The effect of culture on the business management process in a Hispanic setting is explored for the benefit of persons in business in Latin America or with Hispanic groups in the United States. Understanding of cultural differences is important for business managers who work with Spanish speaking employees or clients because of the wide-ranging and…

  19. Institutional Researchers as Knowledge Managers in Universities: Envisioning New Roles for the IR Profession

    ERIC Educational Resources Information Center

    Teodorescu, Daniel

    2006-01-01

    Using concepts from Davenport and Prusak's "Working Knowledge" and other recent research on knowledge management, this article discusses the processes through which institutional knowledge is created, managed and transferred throughout the university and ways in which institutional researchers can improve these processes. A special emphasis is…

  20. Environmental effectiveness of swine sewage management: a multicriteria AHP-based model for a reliable quick assessment.

    PubMed

    Vizzari, Marco; Modica, Giuseppe

    2013-10-01

    Environmental issues related to swine production are still a major concern for the general public and represent a key challenge for the swine industry. The environmental impact of higher livestock concentration is particularly significant where it coincides with weaker policy standards and poor manure management. Effective tools for environmental monitoring of the swine sewage management process become essential for verifying the environmental compatibility of farming facilities and for defining suitable policies aimed at increasing swine production sustainability. This research aims at the development and application of a model for a quick assessment of the environmental effectiveness of the pig farming sewage management process. In order to define the model, multicriteria techniques, and in particular, Saaty's analytic hierarchy process, were used to develop an iterative process in which the various key factors influencing the process under investigation were analyzed. The model, named EASE (Environmental Assessment of Sewages management Effectiveness), was optimized and applied to the Lake Trasimeno basin (Umbria, Italy), an area of high natural, environmental and aesthetic value. In this context, inadequate disposal of pig sewage represents a potential source of very considerable pollution. The results have demonstrated how the multicriteria model can represent a very effective and adaptable tool also in those decision-making processes aimed at the sustainable management of livestock production.

  1. Environmental Effectiveness of Swine Sewage Management: A Multicriteria AHP-Based Model for a Reliable Quick Assessment

    NASA Astrophysics Data System (ADS)

    Vizzari, Marco; Modica, Giuseppe

    2013-10-01

    Environmental issues related to swine production are still a major concern for the general public and represent a key challenge for the swine industry. The environmental impact of higher livestock concentration is particularly significant where it coincides with weaker policy standards and poor manure management. Effective tools for environmental monitoring of the swine sewage management process become essential for verifying the environmental compatibility of farming facilities and for defining suitable policies aimed at increasing swine production sustainability. This research aims at the development and application of a model for a quick assessment of the environmental effectiveness of the pig farming sewage management process. In order to define the model, multicriteria techniques, and in particular, Saaty's analytic hierarchy process, were used to develop an iterative process in which the various key factors influencing the process under investigation were analyzed. The model, named EASE (Environmental Assessment of Sewages management Effectiveness), was optimized and applied to the Lake Trasimeno basin (Umbria, Italy), an area of high natural, environmental and aesthetic value. In this context, inadequate disposal of pig sewage represents a potential source of very considerable pollution. The results have demonstrated how the multicriteria model can represent a very effective and adaptable tool also in those decision-making processes aimed at the sustainable management of livestock production.

  2. Effectiveness of Telebehavioral Health Program Nurse Case Managers (NCM): Data Collection Tools and the Process for NCM-Sensitive Outcome Measures.

    PubMed

    Carlson, Judy; Cohen, Roslyn; Bice-Stephens, Wynona

    2014-01-01

    As a part of our nation's pursuit of improvements in patient care outcomes, continuity of care, and cost containment, the case manager has become a vital member on interdisciplinary teams and in health care agencies. Telebehavioral health programs, as a relatively new method of delivering behavioral health care, have recently begun to incorporate case management into their multidisciplinary teams. To determine the efficacy and efficiency of healthcare programs, program managers are charged with the determination of the outcomes of the care rendered to patient populations. However, programs that use telehealth methods to deliver care have unique structures in place that impact ability to collect outcome data. A military medical center that serves the Pacific region developed surveys and processes to distribute, administer, and collect information about a telehealth environment to obtain outcome data for the nurse case manager. This report describes the survey development and the processes created to capture nurse case manager outcomes. Additionally, the surveys and processes developed in this project for measuring outcomes may be useful in other settings and disciplines.

  3. Managing the three 'P's to improve patient safety: nursing administration's role in managing information technology.

    PubMed

    Simpson, Roy L

    2004-08-01

    The Institute of Medicine's landmark report asserted that medical error is seldom the fault of individuals, but the result of faulty healthcare policy/procedure systems. Numerous studies have shown that information technology (IT) can shore up weak systems. For nursing, IT plays a key role in eliminating nursing mistakes. However, managing IT is a function of managing the people who use it. For nursing administrators, successful IT implementations depend on adroit management of the three 'P's: People, processes and (computer) programs. This paper examines critical issues for managing each entity. It discusses the importance of developing trusting organizations, the requirements of process change, how to implement technology in harmony with the organization and the significance of vision.

  4. Development of Integrated Programs for Aerospace-vehicle design (IPAD): Integrated information processing requirements

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1979-01-01

    The engineering-specified requirements for integrated information processing by means of the Integrated Programs for Aerospace-Vehicle Design (IPAD) system are presented. A data model is described and is based on the design process of a typical aerospace vehicle. General data management requirements are specified for data storage, retrieval, generation, communication, and maintenance. Information management requirements are specified for a two-component data model. In the general portion, data sets are managed as entities, and in the specific portion, data elements and the relationships between elements are managed by the system, allowing user access to individual elements for the purpose of query. Computer program management requirements are specified for support of a computer program library, control of computer programs, and installation of computer programs into IPAD.

  5. Automated management for pavement inspection system (AMPIS)

    NASA Astrophysics Data System (ADS)

    Chung, Hung Chi; Girardello, Roberto; Soeller, Tony; Shinozuka, Masanobu

    2003-08-01

    An automated in-situ road surface distress surveying and management system, AMPIS, has been developed on the basis of video images within the framework of GIS software. Video image processing techniques are introduced to acquire, process and analyze the road surface images obtained from a moving vehicle. ArcGIS platform is used to integrate the routines of image processing and spatial analysis in handling the full-scale metropolitan highway surface distress detection and data fusion/management. This makes it possible to present user-friendly interfaces in GIS and to provide efficient visualizations of surveyed results not only for the use of transportation engineers to manage road surveying documentations, data acquisition, analysis and management, but also for financial officials to plan maintenance and repair programs and further evaluate the socio-economic impacts of highway degradation and deterioration. A review performed in this study on fundamental principle of Pavement Management System (PMS) and its implementation indicates that the proposed approach of using GIS concept and its tools for PMS application will reshape PMS into a new information technology-based system providing a convenient and efficient pavement inspection and management.

  6. GIS-based automated management of highway surface crack inspection system

    NASA Astrophysics Data System (ADS)

    Chung, Hung-Chi; Shinozuka, Masanobu; Soeller, Tony; Girardello, Roberto

    2004-07-01

    An automated in-situ road surface distress surveying and management system, AMPIS, has been developed on the basis of video images within the framework of GIS software. Video image processing techniques are introduced to acquire, process and analyze the road surface images obtained from a moving vehicle. ArcGIS platform is used to integrate the routines of image processing and spatial analysis in handling the full-scale metropolitan highway surface distress detection and data fusion/management. This makes it possible to present user-friendly interfaces in GIS and to provide efficient visualizations of surveyed results not only for the use of transportation engineers to manage road surveying documentations, data acquisition, analysis and management, but also for financial officials to plan maintenance and repair programs and further evaluate the socio-economic impacts of highway degradation and deterioration. A review performed in this study on fundamental principle of Pavement Management System (PMS) and its implementation indicates that the proposed approach of using GIS concept and its tools for PMS application will reshape PMS into a new information technology-based system that can provide convenient and efficient pavement inspection and management.

  7. Studying Associations Between Heart Failure Self-Management and Rehospitalizations Using Natural Language Processing.

    PubMed

    Topaz, Maxim; Radhakrishnan, Kavita; Blackley, Suzanne; Lei, Victor; Lai, Kenneth; Zhou, Li

    2016-09-14

    This study developed an innovative natural language processing algorithm to automatically identify heart failure (HF) patients with ineffective self-management status (in the domains of diet, physical activity, medication adherence, and adherence to clinician appointments) from narrative discharge summary notes. We also analyzed the association between self-management status and preventable 30-day hospital readmissions. Our natural language system achieved relatively high accuracy (F-measure = 86.3%; precision = 95%; recall = 79.2%) on a testing sample of 300 notes annotated by two human reviewers. In a sample of 8,901 HF patients admitted to our healthcare system, 14.4% (n = 1,282) had documentation of ineffective HF self-management. Adjusted regression analyses indicated that presence of any skill-related self-management deficit (odds ratio [OR] = 1.3, 95% confidence interval [CI] = [1.1, 1.6]) and non-specific ineffective self-management (OR = 1.5, 95% CI = [1.2, 2]) was significantly associated with readmissions. We have demonstrated the feasibility of identifying ineffective HF self-management from electronic discharge summaries with natural language processing. © The Author(s) 2016.

  8. Does recyclable separation reduce the cost of municipal waste management in Japan?

    PubMed

    Chifari, Rosaria; Lo Piano, Samuele; Matsumoto, Shigeru; Tasaki, Tomohiro

    2017-02-01

    Municipal solid waste (MSW) management is a system involving multiple sub-systems that typically require demanding inputs, materials and resources to properly process generated waste throughput. For this reason, MSW management is generally one of the most expensive services provided by municipalities. In this paper, we analyze the Japanese MSW management system and estimate the cost elasticity with respect to the waste volumes at three treatment stages: collection, processing, and disposal. Although we observe economies of scale at all three stages, the collection cost is less elastic than the disposal cost. We also examine whether source separation at home affects the cost of MSW management. The empirical results show that the separate collection of the recyclable fraction leads to reduced processing costs at intermediate treatment facilities, but does not change the overall waste management cost. Our analysis also reveals that the cost of waste management systems decreases when the service is provided by private companies through a public tender. The cost decreases even more when the service is performed under the coordination of adjacent municipalities. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. A review of the fate of engineered nanomaterials in municipal solid waste streams.

    PubMed

    Part, Florian; Berge, Nicole; Baran, Paweł; Stringfellow, Anne; Sun, Wenjie; Bartelt-Hunt, Shannon; Mitrano, Denise; Li, Liang; Hennebert, Pierre; Quicker, Peter; Bolyard, Stephanie C; Huber-Humer, Marion

    2018-05-01

    Significant knowledge and data gaps associated with the fate of product-embedded engineered nanomaterials (ENMs) in waste management processes exist that limit our current ability to develop appropriate end-of-life management strategies. This review paper was developed as part of the activities of the IWWG ENMs in Waste Task Group. The specific objectives of this review paper are to assess the current knowledge associated with the fate of ENMs in commonly used waste management processes, including key processes and mechanisms associated with ENM fate and transport in each waste management process, and to use that information to identify the data gaps and research needs in this area. Literature associated with the fate of ENMs in wastes was reviewed and summarized. Overall, results from this literature review indicate a need for continued research in this area. No work has been conducted to quantify ENMs present in discarded materials and an understanding of ENM release from consumer products under conditions representative of those found in relevant waste management process is needed. Results also indicate that significant knowledge gaps associated with ENM behaviour exist for each waste management process investigated. There is a need for additional research investigating the fate of different types of ENMs at larger concentration ranges with different surface chemistries. Understanding how changes in treatment process operation may influence ENM fate is also needed. A series of specific research questions associated with the fate of ENMs during the management of ENM-containing wastes have been identified and used to direct future research in this area. Copyright © 2018 Elsevier Ltd. All rights reserved.

  10. DESC (Defense Electronics Supply Center) Total Quality Management Plan

    DTIC Science & Technology

    1989-04-01

    Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM (Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement

  11. Automating the Air Force Retail-Level Equipment Management Process: An Application of Microcomputer-Based Information Systems Techniques

    DTIC Science & Technology

    1988-09-01

    could use the assistance of a microcomputer-based management information system . However, adequate system design and development requires an in-depth...understanding of the Equipment Management Section and the environment in which it functions were asked and answered. Then, a management information system was...designed, developed, and tested. The management information system is called the Equipment Management Information System (EMIS).

  12. Middle Managers' Experiences and Role in Implementing an Interactive Tailored Patient Assessment eHealth Intervention in Clinical Practice.

    PubMed

    Varsi, Cecilie; Ekstedt, Mirjam; Gammon, Deede; Børøsund, Elin; Ruland, Cornelia M

    2015-06-01

    The role of nurse and physician managers is considered crucial for implementing eHealth interventions in clinical practice, but few studies have explored this. The aim of the current study was to examine the perceptions of nurse and physician managers regarding facilitators, barriers, management role, responsibility, and action taken in the implementation of an eHealth intervention called Choice into clinical practice. Individual qualitative interviews were conducted with six nurses and three physicians in management positions at five hospital units. The findings revealed that nurse managers reported conscientiously supporting the implementation, but workloads prevented them from participating in the process as closely as they wanted. Physician managers reported less contribution. The implementation process was influenced by facilitating factors such as perceptions of benefits from Choice and use of implementation strategies, along with barriers such as physician resistance, contextual factors and difficulties for front-line providers in learning a new way of communicating with the patients. The findings suggest that role descriptions for both nurse and physician managers should include implementation knowledge and implementation skills. Managers could benefit from an implementation toolkit. Implementation management should be included in management education for healthcare managers to prepare them for the constant need for implementation and improvement in clinical practice.

  13. Effective Schools through Effective Management. The School Board's Responsibility. Revised Edition.

    ERIC Educational Resources Information Center

    Genck, Fredric H.; Klingenberg, Allen J.

    The management principles set forth in this handbook encourage broad public and employee involvement. The first of three sections, "Management in Education," looks at the current state of the art, the potential benefits of sound management, and what school boards can do to encourage development of a true management process for their districts. The…

  14. Total Quality Management (TQM) as the Procedure for Management of Integrated Academics.

    ERIC Educational Resources Information Center

    Anderson, Lowell D.

    Total Quality Management (TQM) is a way of doing business that involves every employee, both labor and management, in an effort to improve quality and productivity. The quality management concept consists of common principles: (1) customer focus; (2) process focus; (3) failure prevention; (4) mobilization of work force; (5) decision making based…

  15. Chore to Champions: The Making of Better People Managers. IES Report.

    ERIC Educational Resources Information Center

    Tamkin, P.; Hirsh, W.; Tyers, C.

    The process of making better people managers was examined. Data were collected through interviews with managers and staff at five case study organizations in the United Kingdom and through interviews with a sample of business schools and management developers. The study established that managers must be able to do the following things: (1) empower…

  16. Integrating fire management into land management planning for west-side forests

    Treesearch

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...

  17. Expanding horizons of forest ecosystem management: proceedings of the third habitat futures workshop; 1992 October; Vernon, B.C.

    Treesearch

    Mark H. Huff; Lisa K. Norris; J. Brian Nyberg; Nancy L. Wilkin; coords.

    1994-01-01

    New approaches and technologies to evaluate wildlife-habitat relations, implement integrated forest management, and improve public participation in the process are needed to implement ecosystem management. Presented here are five papers that examine ecosystem management concepts at international, national, regional, and local scales. Two general management problems...

  18. Adaptive management on public lands in the United States: commitment or rhetoric?

    Treesearch

    William H. Moir; William M. Block

    2001-01-01

    Adaptive management (AM is the process of implementing land management activities in incremental steps and evaluating whether desired outcomes are being achieved at each step. If conditions deviate substantially from predictions, management activities are adjusted to achieve the desired outcomes. Thus, AM is a kind of monitoring, an activity that land management...

  19. Application of a geomorphic and temporal perspective to wetland management in North America

    USGS Publications Warehouse

    Smith, L.M.; Euliss, N.H.; Wilcox, D.A.; Brinson, M.M.

    2008-01-01

    The failure of managed wetlands to provide a broad suite of ecosystem services (e.g., carbon storage, wildlife habitat, ground-water recharge, storm-water retention) valuable to society is primarily the result of a lack of consideration of ecosystem processes that maintain productive wetland ecosystems or physical and social forces that restrict a manager's ability to apply actions that allow those processes to occur. Therefore, we outline a course of action that considers restoration of ecosystem processes in those systems where off-site land use or physical alterations restrict local management. Upon considering a wetland system, or examining a particular management regime, there are several factors that will allow successful restoration of wetland services. An initial step is examination of the political/social factors that have structured the current ecological condition and whether those realities can be addressed. Most successful restorations of wetland ecosystem services involve cooperation among multiple agencies, acquisition of funds from non-traditional sources, seeking of scientific advice on ecosystem processes, and cultivation of good working relationships among biologists, managers, and maintenance staff. Beyond that, in on-site wetland situations, management should examine the existing hydrogeomorphic situation and processes (e.g., climatic variation, tides, riverine flood-pulse events) responsible for maintenance of ecosystem services within a given temporal framework appropriate for that wetland's hydrologic pattern. We discuss these processes for five major wetland types (depressional, lacustrine, estuarine, riverine, and man-made impoundments) and then provide two case histories in which this approach was applied: Seney National Wildlife Refuge with a restored fen system and Bosque del Apache National Wildlife Refuge where riverine processes have been simulated to restore native habitat. With adequate partnerships and administrative and political support, managers faced with degraded and/or disconnected wetland processes will be able to restore ecosystem services for society in our highly altered landscape by considering wetlands in their given hydrogeomorphic setting and temporal stage. ?? 2008 The Society of Wetland Scientists.

  20. Clinical operations management in radiology.

    PubMed

    Ondategui-Parra, Silvia; Gill, Ileana E; Bhagwat, Jui G; Intrieri, Lisa A; Gogate, Adheet; Zou, Kelly H; Nathanson, Eric; Seltzer, Steven E; Ros, Pablo R

    2004-09-01

    Providing radiology services is a complex and technically demanding enterprise in which the application of operations management (OM) tools can play a substantial role in process management and improvement. This paper considers the benefits of an OM process in a radiology setting. Available techniques and concepts of OM are addressed, along with gains and benefits that can be derived from these processes. A reference framework for the radiology processes is described, distinguishing two phases in the initial assessment of a unit: the diagnostic phase and the redesign phase.

Top