Science.gov

Sample records for management program section

  1. 75 FR 4098 - Section 8 Management Assessment Program (SEMAP) Certification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... URBAN DEVELOPMENT Section 8 Management Assessment Program (SEMAP) Certification AGENCY: Office of the... performance in administering a housing choice voucher program. Assessment ratings are used as tool in.... This notice also lists the following information: Title of Proposal: Section 8 Management...

  2. 76 FR 5830 - FBI Records Management Division; National Name Check Program Section; New User Fees Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Final Rule establishing the process for setting fees (75 FR 24796 (May 6, 2010)). The ABC methodology is... effective March 4, 2011. FOR FURTHER INFORMATION CONTACT: FBI, RMD, National Name Check Program Section, 170... (CRS) through the National Name Check Program (NNCP) of the Records Management Division (RMD)....

  3. 75 FR 24970 - FBI Records Management Division National Name Check Program Section User Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... INFORMATION CONTACT: FBI, RMD, National Name Check Program Section, 170 Marcel Drive, Winchester, VA 22602... Program (NNCP) of the Records Management Division (RMD). The final rule, to be codified under 28 CFR 20.31... provides the user fees for name-based CRS checks by the NNCP through the FBI's RMD. Name-based NNCP...

  4. Program Management.

    ERIC Educational Resources Information Center

    United Tribes Educational Technical Center, Bismarck, ND.

    The program management guide to Title IV Indian Education projects acquaints participants with program management concepts relative to application forms and encourages the development of management plans and objectives. Sections provide discussions, charts, and examples for the following: regulatory authorities, administrative organizational…

  5. 76 FR 59069 - Revision to the Section 8 Management Assessment Program Lease-Up Indicator

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... URBAN DEVELOPMENT 24 CFR Part 985 RIN 2577-AC76 Revision to the Section 8 Management Assessment Program... Urban Development, 451 7th Street, SW., Room 10276, Washington, DC 20410-0500. Communications should... and Urban Development, 451 7th Street, SW., Room 10276, Washington, DC 20410-0500. 2....

  6. Setting the Course for Clean Water: A Citizen's Guide to the Section 208 Water Quality Management Program.

    ERIC Educational Resources Information Center

    Donley, Diane L.; Albright, Catherine

    This is a citizen's guide to the section 208 water quality management program. Section 208 refers to that section of the Federal Water Pollution Control Act of 1972 (the Clean Water Act) which calls for public participation in water quality management planning. Included in this guide are chapters on controlling pollution through the Clean Water…

  7. 78 FR 52964 - 30-Day Notice of Proposed Information Collection: Section 8 Management Assessment Program (SEMAP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... URBAN DEVELOPMENT 30-Day Notice of Proposed Information Collection: Section 8 Management Assessment... of Management and Budget (OMB) for review, in accordance with the Paperwork Reduction Act. The... Officer, Office of Management and Budget, New Executive Office Building, Washington, DC 20503; fax:...

  8. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1995 annual report.

    SciTech Connect

    Young, Franklin R.

    1997-04-01

    Report on progress on evaluation of the Columbia River Northern Squawfish Management Program in 1995. The objectives in 1995 were to (1) evaluate exploitation rate and size composition of northern squawfish captured in various fisheries, and estimate reductions in predation on juvenile salmonids since implementation of the Northern Squawfish Management Program; and (2) evaluate changes through 1995 in relative abundance, consumption, size and age structure, growth, and fecundity of northern squawfish in lower Columbia and Snake River reservoirs and in the Columbia River downstream from Bonneville Dam.

  9. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1994 Annual Report.

    SciTech Connect

    Young, Franklin R.; Willis, Charles F.

    1995-09-01

    Report on the progress on evaluation of the Northern Squawfish Management Program in 1994. The objectives in 1994 were to (1) evaluate exploitation rate, size composition, and incidental catch of northern squawfish (Ptychocheilus oregonensis) captured in the various fisheries and estimate reductions in predation on juvenile salmonids since implementation of the management program, and (2) evaluate changes through 1994 in relative abundance, smolt consumption rate, size and age structure, growth, and fecundity of northern squawfish in lower Columbia and Snake River reservoirs and the Columbia River downstream from Bonneville Dam.

  10. 77 FR 32015 - Revision to the Section 8 Management Assessment Program Lease-Up Indicator

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-31

    ... published in the Federal Register a proposed rule, at 76 FR 59069, that proposed to revise the process by... proposal to align the SEMAP lease-up indicator with the process for measuring voucher management system..., approved December 8, 2004) addressed the subject of voucher management system leasing and cost data....

  11. 78 FR 79310 - Partial Section Eight Management Assessment Program (SEMAP) Indicator Waiver; Family Self...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... and social policy research organization dedicated to learning what works to improve programs that... Waiver; Family Self-Sufficiency (FSS) Program Demonstration AGENCY: Office of Policy Development and..., 2013. FOR FURTHER INFORMATION CONTACT: Regina Gray, Ph.D., Office of Policy Development and...

  12. Environmental Impact Research Program and Defense Natural Resources Program: Section 7. 5. 7, US Army Corps of Engineers Wildlife Resources Management manual. Final report. [ELAEAGNUS UMBELLATA

    SciTech Connect

    Dittberner, P.L.; Dietz, D.R.; Wasser, C.H.; Martin, C.O.; Mitchell, W.A.

    1992-02-01

    A plant materials report on autumn olive (Elaeagnus umbellata) is provided as Section 7.5.7 of the US Army Corps of Engineers Wildlife Resources management Manual. The report was prepared as a guide to assist project/installation natural resources personnel with the selection, establishment, and management of appropriate plant materials for wildlife and habitat development programs. Major topics covered are description, distribution, habitat requirements, wildlife and land management value, establishment, maintenance, and cautions and limitations. Autumn olive is a hardy shrub or small tree introduced into the United States from Asia. It is widely used in the East in habitat improvement projects designed to attract wildlife, provide barriers, beautify existing landscapes, and reclaim disturbed sites. Autumn olive is tolerant of a wide range of soils and climatic conditions. Plants grow best on well-drained soils that are deep, sandy, loamy, or moderately fine-textured. Establishment of autumn olive is often recommended for borders, hedgerows, windbreaks, and disturbed sites. Planting stock of autumn olive is readily available, and some commercial nurseries produce propagules in quantity. Four cultivars (Cardinal, Ellagood, Elsberry, and Redwing) have been developed and are adapted to geographically specific regions. This report provides information on management objectives, site selection and preparation, propagule selection, planting methods, and maintenance requirements for autumn olive throughout its area of potential use. Management cautions and limitations are discussed, and guidelines are provided on the appropriate use of autumn olive in wildlife and habitat management programs.

  13. Development of a Systemwide Predator Control Program Section I : Northern Squawfish Management Program Implementation, 1995 Annual Report.

    SciTech Connect

    Young, Franklin R.

    1997-04-01

    Results from the fifth year of a basinwide program to harvest northern squawfish (Ptychocheilus oregonensis) in an effort to reduce mortality due to northern squawfish predation on juvenile salmonids during their emigration from natal streams to the ocean.

  14. Development of a Systemwide Predator Control Program, Section I : Northern Squawfish Management Program Implementation, 1996 Annual Report.

    SciTech Connect

    Young, Franklin R.

    1997-11-01

    Report on the results from the sixth year of a basinwide program to harvest northern squawfish (Ptychocheilus oregonensis) in an effort to reduce mortality due to northern squawfish predation on juvenile salmonids during their emigration from natal streams to the ocean.

  15. Development of a Systemwide Predator Control Program, Section I : Northern Squawfish Management Program - Implementation, 1997 Annual Report.

    SciTech Connect

    Young, Franklin R.

    1998-10-01

    Report on results from the sixth year of a basin-wide program to harvest northern pikeminnow (Ptychocheilus oregonensis) in an effort to reduce mortality due to northern pikeminnow predation on juvenile salmonids during their emigration from natal streams to the ocean.

  16. Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations

    SciTech Connect

    Witte, M.C.

    1994-10-01

    In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

  17. Development of a Systemwide Predator Control Program, Section I : Northern Squawfish Management Program Implementation, 1994 annual report.

    SciTech Connect

    Willis, Charles F.; Young, Franklin R.

    1995-09-01

    The authors report the results from the forth year of a basinwide program to harvest northern squawfish (Ptychocheilus oregonensis) in an effort to reduce mortality due to northern squawfish predation on juvenile salmonids during their emigration from natal streams to the ocean. Earlier work in the Columbia River Basin suggested predation by northern squawfish on juvenile salmonids may account for most of the 10--20% mortality juvenile salmonids experience in each of eight Columbia and Snake River reservoirs. Modeling simulations based on work in John Day Reservoir from 1982 through 1988 indicated it is not necessary to eradicate northern squawfish to substantially reduce predation-caused mortality of juvenile salmonids. Instead, if northern squawfish were exploited at a 10--20% rate, reductions in numbers of larger, older fish resulting in restructuring of their population could reduce their predation on juvenile salmonids by 50% or more. Consequently, the authors designed and tested a sport-reward angling fishery and a commercial longline fishery in the John Day pool in 1990. They also conducted an angling fishery in areas inaccessible to the public at four dams on the mainstem Columbia River and at Ice Harbor Dam on the Snake River. Based on the success of these limited efforts, they implemented three test fisheries on a multi-pool, or systemwide, scale in 1991--a tribal longline fishery above Bonneville Dam, a sport-reward fishery, and a dam-angling fishery.

  18. Development of a Systemwide Predator Control Program, Section II : Northern Squawfish Management Program Evaluation, 1996 annual report.

    SciTech Connect

    Young, Franklin R.

    1997-11-01

    Predator control fisheries aimed at reducing predation on juvenile salmonids by northern squawfish Ptychocheilus oregonensis were implemented for the seventh consecutive year in the mainstem Columbia and Snake rivers. In this report, we (1) evaluate northern squawfish exploitation and size composition, and compare catch rate of incidentally-harvested fishes among the three major management fisheries in 1996, (2) estimate reductions in predation on juvenile salmonids since implementation of the fisheries, and (3) evaluate changes from 1990-96 in relative abundance, consumption, size and age structure, growth, and fecundity of northern squawfish. Systemwide exploitation of northern squawfish 2 250 mm fork length was 12.1% for sport-reward, 0.3% for dam-angling, and 0.5% for site-specific gill-net fisheries. Total exploitation was lowest in Lower Monumental Reservoir (0.0%) and highest in McNary Reservoir (18.2%). Mean fork length of harvested northern squawfish was 355 mm in the sport-reward, 391 mm in the dam-angling, and 408 mm in the gill-net fisheries. The dam-angling fishery had the lowest percentage (3.6%) of incidental catch relative to the total number of fish caught. Incidental catch was 27.0% in the sport-reward fishery and 54.6% in the gill-net fishery. If exploitation rates remain similar to mean 1991-96 levels, we estimate that potential predation by northern squawfish on juvenile salmonids in 1997 will be approximately 62% of predation levels prior to the implementation of removal fisheries. Further reductions in predation may be small, unless average exploitation in future years is higher than 1994-96 levels. Relative abundance of northern squawfish declined slightly from 1995 in Bonneville Reservoir, Lower Monumental Dam tailrace, and Little Goose Dam tailrace. Mean abundance for 1994-96 was 48-60% of 1990-93 levels among areas sampled at least five years. Indices of consumption were lower than 1995 in all areas except during summer in the tailrace

  19. Quality Management Program

    SciTech Connect

    Not Available

    1991-10-01

    According to {section} 35.32, Quality Management Program,'' of 10 CFR Part 35, Medical Use of Byproduct Material,'' applicants or licensees, as applicable, are required to establish a quality management (QM) program. This regulatory guide provides guidance to licensees and applicants for developing policies and procedures for the QM program. This guide does not restrict or limit the licensee from using other guidance that may be equally useful in developing a QM program, e.g., information available from the Joint Commission on Accreditation of Healthcare Organizations or the American College of Radiology. Any information collection activities mentioned in this regulatory guide are contained as requirements in 10 CFR Part 35, which provides the regulatory basis for this guide. This information collection requirements in 10 CFR Part 35 have been cleared under OMB Clearance No. 3150-0010.

  20. Illinois' nonpoint source management program

    SciTech Connect

    Not Available

    1994-07-01

    The Illinois Nonpoint Source (NPS) Management Program (Program) describes the statewide authorities that give the Illinois Environmental Protection Agency (IEPA) responsibility to develop and implement this Program. It provides a brief summary of the results of the States' NPS assessment as reported in the Illinois Water Quality Report. Included are eleven sections correlated to NPS pollution sources, or to an area of water pollution protection initiatives. These sections outline goals and objectives to be implemented in Illinois to abate NPS pollution, when possible the sections include a descriptive narrative. Included in the Program, is the process or mechanism which Illinois uses to prioritize and fund future projects. Finally, this Program identifies the federal programs that the IEPA currently reviews for consistency with statewide goals and objectives. Revisions to the Program will be made in accordance with state and federal program changes and as needed.

  1. Managing Mentoring Programs.

    ERIC Educational Resources Information Center

    IUME Briefs, 1992

    1992-01-01

    Some programs for helping at-risk youth achieve excellent results, while others do not. One reason for program success can be proper management. Mentoring is a promising strategy for helping at-risk youth. Planners who want to create effective mentoring programs should look at the implementation experiences of other youth programs. Evaluations…

  2. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  3. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  4. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  5. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  6. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  7. 20 CFR 638.800 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management. 638.800 Section 638.800... TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Administrative Provisions § 638.800 Program management. (a) The Job Corps Director shall establish and use internal program management procedures...

  8. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 402.13 Section 402.13... WATER-RESOURCES TECHNOLOGY DEVELOPMENT PROGRAM Application, Evaluation, and Management Procedures § 402.13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant...

  9. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  10. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE CONTRACTS AND ASSISTANCE General § 800.002 Program management. Program management responsibility...

  11. 30 CFR 401.12 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Program management. 401.12 Section 401.12 Mineral Resources GEOLOGICAL SURVEY, DEPARTMENT OF THE INTERIOR STATE WATER RESEARCH INSTITUTE PROGRAM Application and Management Procedures § 401.12 Program management. (a) Upon approval of each fiscal...

  12. Navigator program risk management

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Padilla, Deborah A.

    2004-01-01

    In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

  13. Labor/Management Workplace Education Programs.

    ERIC Educational Resources Information Center

    Chernow, Harneen

    This report includes two sections: (1) an overview of the issues involved in joint labor/management workplace education programs and (2) a description of such a program partnering two union locals, nine hospitals, and Bunker Hill Community College to implement a workplace-based career ladder program. The first section explains that unions and…

  14. Program Management Tool

    NASA Technical Reports Server (NTRS)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  15. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  16. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  17. Acquisition-Management Program

    NASA Technical Reports Server (NTRS)

    Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.

    1987-01-01

    NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

  18. Aircrew team management program

    NASA Technical Reports Server (NTRS)

    Margerison, Charles; Mccann, Dick; Davies, Rod

    1987-01-01

    The key features of the Aircrew Team Management Workshop which was designed for and in consultation with Trans Australia Airlines are outlined. Five major sections are presented dealing with: (1) A profile of the airline and the designers; (2) Aircrew consultation and involvement; (3) Educational design and development; (4) Implementation and instruction; and (5) Evaluation and assessment. These areas are detailed.

  19. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  20. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  1. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  2. 14 CFR 1214.1706 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Program management. 1214.1706 Section 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  3. Actinide cross section program at ORELA

    SciTech Connect

    Dabbs, J. W.T.

    1980-01-01

    The actinide cross section program at ORELA, the Oak Ridge Electron Linear Accelerator, is aimed at obtaining accurate neutron cross sections (primarily fission, capture, and total) for actinide nuclides which occur in fission reactors. Such cross sections, measured as a function of neutron energy over as wide a range of energies as feasible, comprise a data base that permits calculated predictions of the formation and removal of these nuclides in reactors. The present program is funded by the Division of Basic Energy Sciences of DOE, and has components in several divisions at ORNL. For intensively ..cap alpha..-active nuclides, many of the existing fission cross section data have been provided by underground explosions. New measurement techniques, developed at ORELA, now permit linac measurements on fissionable nuclides with alpha half-lives as short as 28 years. Capture and capture-plus-fission measurements utilize scintillation detectors (of capture ..gamma.. rays and fission neutrons) in which pulse shape discrimination plays an important role. Total cross sections can be measured at ORELA on samples of only a few milligrams. A simultaneous program of chemical and isotopic analyses of samples irradiated in EBR-II is in progress to provide benchmarks for the existing differential measurements. These analyses are being studied with updated versions of ORIGEN and with sensitivity determinations. Calculations of the sensitivity to cross section changes of various aspects of the nuclear fuel cycle are also being made. Even in this relatively mature field, many cross sections still require improvements to provide an adequate data base. Examples of recent techniques and measurements are presented. 12 figures, 3 tables.

  4. 14 CFR 91.1003 - Management contract between owner and program manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION,...

  5. 14 CFR 91.1003 - Management contract between owner and program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION,...

  6. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  7. Hawaii Energy Strategy: Program guide. [Contains special sections on analytical energy forecasting, renewable energy resource assessment, demand-side energy management, energy vulnerability assessment, and energy strategy integration

    SciTech Connect

    Not Available

    1992-09-01

    The Hawaii Energy Strategy program, or HES, is a set of seven projects which will produce an integrated energy strategy for the State of Hawaii. It will include a comprehensive energy vulnerability assessment with recommended courses of action to decrease Hawaii's energy vulnerability and to better prepare for an effective response to any energy emergency or supply disruption. The seven projects are designed to increase understanding of Hawaii's energy situation and to produce recommendations to achieve the State energy objectives of: Dependable, efficient, and economical state-wide energy systems capable of supporting the needs of the people, and increased energy self-sufficiency. The seven projects under the Hawaii Energy Strategy program include: Project 1: Develop Analytical Energy Forecasting Model for the State of Hawaii. Project 2: Fossil Energy Review and Analysis. Project 3: Renewable Energy Resource Assessment and Development Program. Project 4: Demand-Side Management Program. Project 5: Transportation Energy Strategy. Project 6: Energy Vulnerability Assessment Report and Contingency Planning. Project 7: Energy Strategy Integration and Evaluation System.

  8. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  9. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  10. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  11. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Program management..., DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities... management: DAEN-CWP (Sections 205, 208, 14, 107 and 103 Authorities) and DAEN-CWO (Section 3 and...

  12. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  13. Integrated Financial Management Program

    NASA Technical Reports Server (NTRS)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  14. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1411 Continuous airworthiness maintenance program use by fractional ownership program manager. Fractional ownership...

  15. 14 CFR 91.1411 - Continuous airworthiness maintenance program use by fractional ownership program manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... program use by fractional ownership program manager. 91.1411 Section 91.1411 Aeronautics and Space FEDERAL... GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1411 Continuous airworthiness maintenance program use by fractional ownership program manager. Fractional ownership...

  16. Program audit, A management tool

    NASA Technical Reports Server (NTRS)

    Miller, T. J.

    1971-01-01

    Program gives in-depth view of organizational performance at all levels of the management structure, and provides means by which managers can effectively and efficiently evaluate adequacy of management direction, policies, and procedures.

  17. Heavy-Section Steel Irradiation Program

    SciTech Connect

    Rosseel, T.M.

    2000-04-01

    Maintaining the integrity of the reactor pressure vessel (RPV) in a light-water-cooled nuclear power plant is crucial in preventing and controlling severe accidents that have the potential for major contamination release. Because the RPV is the only key safety-related component of the plant for which a redundant backup system does not exist, it is imperative to fully understand the degree of irradiation-induced degradation of the RPV's fracture resistance that occurs during service. For this reason, the Heavy-Section Steel Irradiation (HSSI) Program has been established.

  18. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... planning and management activities. Grant administrative requirements for these funds appear in 40 CFR... 40 CFR part 35, subpart J. A State may also use part of the 205(g) funds to administer approved... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Program management. 130.11 Section...

  19. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  20. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1993-01-01

    This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  1. Prevention Program Management. Participant Manual.

    ERIC Educational Resources Information Center

    University Research Corp., Bethesda, MD.

    This training package, which centers on effective management and the operation of valid prevention programs, presents a five-day training experience designed to help managers of substance-abuse prevention programs. In this participant manual, the introduction includes a list of program goals and objectives and a summary of the ten individual…

  2. Fluor Hanford Safety Management Program

    SciTech Connect

    WILLIAMS, J.D.

    2003-02-06

    This document summarizes safety management programs used within the scope of the project Hanford Management Contract (PHMC). The document had been developed to meet the format & content requirements of DOE-STD-3009-94, CH-2.

  3. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  4. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  5. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  6. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  7. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management planning program. 740.4 Section 740.4 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A...

  8. Hanford Environmental Management Program Plan

    SciTech Connect

    DeFigh-Price, C.

    1989-09-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office (DOE-RL). Westinghouse Hanford Company (WHC) has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as reporting and planning and to facilitate compliance with environmental regulations. This document describes the scope of work funded by this program for Fiscal Year (FY) 1990, presents the prioritized tasks covered, the management structure in place and the assessment allocation methodology used to determine the FY 1990 assessments. 15 refs., 3 figs., 2 tabs.

  9. Section 4: Evaluation of carbon management requirements

    NASA Astrophysics Data System (ADS)

    The chapters in this section are perhaps the broadest of the book. They discuss the integrated set of factors that affect carbon management in general. Roed-Larsen and Flach start the section with a detailed summary of current accreditation schemes. Verification of carbon credits is critical for validation of monetary sequestration incentives. Commercial-scale geologic sequestration will likely not advance unless such financial incentives are implemented. The type of incentive also is critical. For example, in the one country where a carbon tax is in place, Norway, commercial geologic sequestration has been underway since 1996. In other countries, where a cap-and-trade system is in place, and of course in countries where no incentives are offered, no commercial carbon sequestration is taking place.

  10. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  11. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management systems. 632.76 Section... for the overall management of all programs including: (1) Eligibility verification systems...

  12. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section... for the overall management of all programs including: (1) Eligibility verification systems...

  13. Prevention Program Management. Trainer Manual.

    ERIC Educational Resources Information Center

    University Research Corp., Bethesda, MD.

    This training package, which centers on effective management and the operation of valid prevention programs, presents a five-day training experience designed to help managers of substance-abuse prevention programs. In this trainer manual, the introduction includes a list of course goals and objectives, a summary of the ten individual training…

  14. Stress Management. Program Evaluation Handbook.

    ERIC Educational Resources Information Center

    IOX Assessment Associates, Culver City, CA.

    Intended as a resource for individuals wishing to evaluate stress management programs, this handbook, one of a series of seven, provides a collection of measuring devices that can improve the quality of such evaluations. Chapter 1 introduces the handbook's contents and outlines evaluation related issues specific to stress management programs.…

  15. Managing Management Training Programs in Gerontology.

    ERIC Educational Resources Information Center

    Lowy, Louis; And Others

    A graduate-level management training program in gerontology is presented through a description of a consortium of two universities (Boston University and Brandeis University) and consisting of three types of training (gerontology and aging, sociology and social work, and management techniques). The areas of interest described in these materials…

  16. 14 CFR 91.1017 - Amending program manager's management specifications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Ownership Operations Program Management § 91.1017 Amending program manager's management specifications. (a... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Amending program manager's management... specifications; or (2) The program manager applies for the amendment of any management specifications, and...

  17. GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION.

    SciTech Connect

    PAQUETTE,D.E.; BENNETT,D.B.; DORSCH,W.R.; GOODE,G.A.; LEE,R.J.; KLAUS,K.; HOWE,R.F.; GEIGER,K.

    2002-05-31

    THE DEPARTMENT OF ENERGY ORDER 5400.1, GENERAL ENVIRONMENTAL PROTECTION PROGRAM, REQUIRES THE DEVELOPMENT AND IMPLEMENTATION OF A GROUNDWATER PROTECTION PROGRAM. THE BNL GROUNDWATER PROTECTION MANAGEMENT PROGRAM DESCRIPTION PROVIDES AN OVERVIEW OF HOW THE LABORATORY ENSURES THAT PLANS FOR GROUNDWATER PROTECTION, MONITORING, AND RESTORATION ARE FULLY DEFINED, INTEGRATED, AND MANAGED IN A COST EFFECTIVE MANNER THAT IS CONSISTENT WITH FEDERAL, STATE, AND LOCAL REGULATIONS.

  18. Asthma management programs in managed care organizations.

    PubMed

    Hartmann, Christine W; Maio, Vittorio; Goldfarb, Neil I; Cobb, Nicole; Nash, David B

    2005-12-01

    The aim of this work was to investigate how managed care organizations (MCOs) currently approach asthma treatment and management and to determine factors affecting asthma outcomes. A Web-based survey was administered to a national sample of 351 medical directors of MCOs to investigate the asthma management program components in their organizations as well as gaps and barriers in the management of patients with asthma. All 134 (38.2%) responding medical directors reported that their organizations monitor asthma patients. Plans use a variety of asthma management activities, including general member education (90%), member education by mail (87%), self-management education (85%), and provider education (82%). Educational resources (89%) and telephone advice nurse (77%) were the most common self-management strategies offered. Among factors impeding the provision of effective asthma care, noncompliance with asthma treatment, the inappropriate use of medications, and the need for multiple medications were cited by virtually all respondents. Health plans rely on an array of strategies to manage asthma patients. Education encouraging patient self-management is a key component of asthma management programs. However, a considerable number of treatment approach barriers are impeding the achievement of proper asthma care. Without innovative approaches to care, it appears that current MCOs' asthma management efforts may not result in substantial improvements in asthma outcomes.

  19. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  20. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  1. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  2. 10 CFR 800.002 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Program management. 800.002 Section 800.002 Energy DEPARTMENT OF ENERGY LOANS FOR BID OR PROPOSAL PREPARATION BY MINORITY BUSINESS ENTERPRISES SEEKING DOE... financial assistance awarded under this regulation has been assigned to the Office of Minority...

  3. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  4. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  5. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  6. 40 CFR 130.11 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS WATER QUALITY... 106, 205(j) and 205(g) to carry out water quality planning and management activities. Interstate agencies may apply for grants under section 106 to carry out water quality planning and...

  7. Wildlife Management Assistance Program

    SciTech Connect

    Caudell, M.B.

    1992-08-01

    This report details activities in administering Savannah River Site public lands for wildlife management. Accomplishments in administering hunts, gathering biological data, and in coordinating land use are described.

  8. Communicating Risk to Program Managers

    NASA Technical Reports Server (NTRS)

    Shivers, C. Herbert

    2005-01-01

    Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

  9. Environmental Management Science Program Workshop

    SciTech Connect

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  10. 10 CFR 905.1 - What are the purposes of the Energy Planning and Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Management Program? 905.1 Section 905.1 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM General Provisions § 905.1 What are the purposes of the Energy Planning and Management Program? The purposes of the Energy Planning and Management Program (EPAMP) are to meet the objectives of Section 114...

  11. 33 CFR 263.16 - Program management responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Program management responsibilities. 263.16 Section 263.16 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE CONTINUING AUTHORITIES PROGRAMS General § 263.16 Program management responsibilities. (a) Office, Chief of Engineers. Two...

  12. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... management program and entry into the program must be filed within 10 days of the effective date of the...

  13. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... management program and entry into the program must be filed within 10 days of the effective date of the...

  14. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... management program and entry into the program must be filed within 10 days of the effective date of the...

  15. The NASA Risk Management Program

    NASA Technical Reports Server (NTRS)

    Buchbinder, Benjamin

    1990-01-01

    This paper describes the NASA Risk Management Program established by the Headquarters Office of Safety and Mission Quality (MSQ). Current agency policy is outlined, risk management assistance to the field is described, and examples are given of independent risk assessments conducted by SMQ. The motivation for and the structure of the program is placed in the historical context of pre- and post-Challenger environments.

  16. A Program Management Framework for Facilities Managers

    ERIC Educational Resources Information Center

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  17. Heavy-Section Steel Technology program overview

    SciTech Connect

    Pennell, W.E.

    1990-01-01

    This paper presents a status review of ongoing HSST program tasks aimed at refining the technology used in analysis of reactor pressure vessel fracture margins under pressurized thermal-shock (PTS) loading. Specific fracture-technology issues addressed include vessel flaw density and distribution, shallow flaws, fracture-toughness data transfer, circumferential cracks, ductile tearing and the influence of low-tearing toughness in stainless steel cladding. Preliminary results from the analysis and test programs are presented, together with interim assessments of their potential impact on a reactor vessel PTS analysis. 31 refs., 23 figs., 1 tab.

  18. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  19. 38 CFR 49.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program management. 49.20 Section 49.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... Program Management § 49.20 Purpose of financial and program management. Sections 49.21 through 49.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  20. 38 CFR 49.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... program management. 49.20 Section 49.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... Program Management § 49.20 Purpose of financial and program management. Sections 49.21 through 49.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  1. 29 CFR 95.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Purpose of financial and program management. 95.20 Section...-Award Requirements Financial and Program Management § 95.20 Purpose of financial and program management. Sections 95.21 through 95.28 prescribe standards for financial management systems, methods for...

  2. 29 CFR 95.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Purpose of financial and program management. 95.20 Section...-Award Requirements Financial and Program Management § 95.20 Purpose of financial and program management. Sections 95.21 through 95.28 prescribe standards for financial management systems, methods for...

  3. 29 CFR 95.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Purpose of financial and program management. 95.20 Section...-Award Requirements Financial and Program Management § 95.20 Purpose of financial and program management. Sections 95.21 through 95.28 prescribe standards for financial management systems, methods for...

  4. 36 CFR 1210.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program management. 1210.20 Section 1210.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND... Financial and Program Management § 1210.20 Purpose of financial and program management. Sections 1210.21 through 1210.28 prescribe standards for financial management systems, methods for making payments...

  5. 29 CFR 95.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Purpose of financial and program management. 95.20 Section...-Award Requirements Financial and Program Management § 95.20 Purpose of financial and program management. Sections 95.21 through 95.28 prescribe standards for financial management systems, methods for...

  6. 36 CFR 1210.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... program management. 1210.20 Section 1210.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND... Financial and Program Management § 1210.20 Purpose of financial and program management. Sections 1210.21 through 1210.28 prescribe standards for financial management systems, methods for making payments...

  7. 29 CFR 95.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Purpose of financial and program management. 95.20 Section...-Award Requirements Financial and Program Management § 95.20 Purpose of financial and program management. Sections 95.21 through 95.28 prescribe standards for financial management systems, methods for...

  8. 38 CFR 49.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... program management. 49.20 Section 49.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... Program Management § 49.20 Purpose of financial and program management. Sections 49.21 through 49.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  9. 36 CFR 1210.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program management. 1210.20 Section 1210.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND... Financial and Program Management § 1210.20 Purpose of financial and program management. Sections 1210.21 through 1210.28 prescribe standards for financial management systems, methods for making payments...

  10. Performance Demonstration Program Management Plan

    SciTech Connect

    Carlsbad Field Office

    2005-07-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by

  11. Managing Adult and Continuing Education Programs and Staff.

    ERIC Educational Resources Information Center

    Langerman, Philip D., Ed.; Smith, Douglas H., Ed.

    Developed to assist managers of adult and continuing education programs, this management guide contains thirteen chapters written by several authors selected for their expertise in their respective areas. These chapters are divided into three major sections. The first section includes three introductory chapters providing (1) an overview of this…

  12. 14 CFR § 1214.1706 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Program management. § 1214.1706 Section § 1214.1706 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT Space Flight Participants § 1214.1706 Program management. The Associate Administrator for Space Flight is responsible...

  13. 18 CFR 141.500 - Cash management programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Cash management programs. 141.500 Section 141.500 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... agreements with the Commission. The documentation establishing the cash management program and entry into...

  14. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management programs. 357.5 Section 357.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... the Commission. The documentation establishing the cash management program and entry into the...

  15. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Cash management programs. 357.5 Section 357.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... the Commission. The documentation establishing the cash management program and entry into the...

  16. 18 CFR 141.500 - Cash management programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Cash management programs. 141.500 Section 141.500 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... agreements with the Commission. The documentation establishing the cash management program and entry into...

  17. 18 CFR 141.500 - Cash management programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Cash management programs. 141.500 Section 141.500 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... agreements with the Commission. The documentation establishing the cash management program and entry into...

  18. 18 CFR 357.5 - Cash management programs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Cash management programs. 357.5 Section 357.5 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... the Commission. The documentation establishing the cash management program and entry into the...

  19. CRC handbook of management of radiation protection programs

    SciTech Connect

    Miller, K.L.; Weider, W.A.

    1985-01-01

    This volume details the organization and management of radiation safety programs, including both preventive and emergency response measures. Included are guidelines and checklists for managing radioactive waste processing programs, dealing with litigation, and responding to public or news media concerns. The last sections list state, federal, and international requirements for transportation of radioactive materials.

  20. Hazardous Materials Management Program Report- 2005.

    SciTech Connect

    Brynildson, Mark E.

    2005-06-01

    The annual program report provides detailed information about all aspects of the SNL/CA Hazardous Materials Management Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  1. Clean Water Act (section 319): An evaluation of program implementation in region 10

    SciTech Connect

    Barfeld, E.

    1992-09-01

    Nonpoint source pollution, long overlooked in federal water pollution regulation, has now become a centerpiece of pollution control efforts. Congress added Section 319 -- the nonpoint source management programs section -- to the Clean Water Act in the 1987 Amendments to demonstrate federal commitment to nonpoint source control activities. Section 319(h) grant money, provided by EPA to individual states, forms an integral part of the federal nonpoint source program. EPA national and regional guidance give direction to the Section 319(h) grant program. As an evolving federal program Section 319 must carve out a niche for itself in relation to ongoing statewide nonpoint source control efforts. This paper provides an analysis of the Section 319 program and the effectiveness of Section 319(h)-funded projects in protecting water quality in Region 10 states, which include Washington, Oregon, Idaho, and Alaska. The report identifies characteristics of successful Section 319 projects, reviews selected Section 319 projects, highlights several important issues surrounding the Section 319 program, and makes recommendations for program improvement.

  2. Indoor Air Quality Management Program.

    ERIC Educational Resources Information Center

    Anne Arundel County Public Schools, Annapolis, MD.

    In an effort to provide Indoor Air Quality (IAQ) management guidance, Anne Arundel County Public Schools was selected by the Maryland State Department of Education to develop a program that could be used by other school systems. A major goal was to produce a handbook that was "user friendly." Hence, its contents are a mix of history, philosophy,…

  3. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 12 2014-10-01 2014-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  4. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 12 2012-10-01 2012-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  5. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 12 2013-10-01 2013-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  6. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  7. 50 CFR 648.85 - Special management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Special management programs. 648.85 Section 648.85 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the NE Multispecies and...

  8. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  9. Sport Management Graduate Programs: Characteristics of Effectiveness.

    ERIC Educational Resources Information Center

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  10. Guidance: Requirements for Installing Renewable Fuel Pumps at Federal Fleet Fueling Centers under EISA Section 246: Federal Fleet Program, Federal Energy Management Program, U.S. Department of Energy, March 2011

    SciTech Connect

    Not Available

    2011-03-01

    On December 19, 2007, the Energy Independence and Security Act of 2007 (EISA) was signed into law as Public Law 110-140. Section 246(a) of EISA directs Federal agencies to install at least one renewable fuel pump at each Federal fleet fueling center under their jurisdiction by January 1, 2010. Section 246(b) requires the President to submit an annual report to Congress on Federal agency progress in meeting this renewable fuel pump installation mandate. This guidance document provides guidelines to help agencies understand these requirements and how to comply with EISA Section 246.

  11. Should Special Program Students Be Placed in Separate Course Sections?

    ERIC Educational Resources Information Center

    Brothen, Thomas

    2012-01-01

    This article describes the evaluation of separate discussion sections for special admissions students participating in a developmental program and attending an introduction to psychology course. In year one, the special admissions students were segregated into separate small enrollment discussion sections within the larger course. In year two,…

  12. CONIC program user's manual. [conic-section orbit calculation

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A user's manual for the current CONIC computer program is presented. The program was written in FORTRAN for use on the TRW Time Share system. The CONIC program is used to calculate the relative motion of two bodies in any conic-section orbit (circular, elliptical, parabolic, or hyperbolic). This manual describes the basic equations used for trajectory propagation and defines the input and output parameters of the program. Sample runs with corresponding figures and a detailed flow chart of the program are included.

  13. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  14. Nuclear Waste Management Program summary document, FY 1981

    SciTech Connect

    Meyers, Sheldon

    1980-03-01

    The Nuclear Waste Management Program Summary Document outlines the operational and research and development (R and D) activities of the Office of Nuclear Waste Management (NEW) under the Assistant Secretary for Nuclear Energy, US Department of Energy (DOE). This document focuses on the current and planned activities in waste management for FY 1981. This Program Summary Document (PSD) was prepared in order to explain the Federal nuclear waste management and spent fuel storage programs to Congress and its committees and to interested members of the public, the private sector, and the research community. The national energy policy as it applies to waste management and spent fuel storage is presented first. The program strategy, structure, budget, management approach, and public participation programs are then identified. The next section describes program activities and outlines their status. Finally, the applicability of departmental policies to NEW programs is summarized, including field and regional activities, commercialization plans, and environmental and socioeconomic implications of waste management activities, and international programs. This Nuclear Waste Management Program Summary Document is meant to serve as a guide to the progress of R and D and other energy technology programs in radioactive waste management. The R and D objective is to provide the Nation with acceptable solutions to short- and long-term management problems for all forms of radioactive waste and spent fuel.

  15. 38 CFR 49.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.20 Purpose of financial and program management. Sections 49.21 through 49.28... program management. 49.20 Section 49.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF...

  16. Home audit program: management manual

    SciTech Connect

    Not Available

    1980-09-01

    Many public power systems have initiated home energy audit programs in response to the requests of their consumers. The manual provides smaller public power systems with the information and specific skills needed to design and develop a program of residential energy audits. The program is based on the following precepts: locally owned public systems are the best, and in many cases the only agencies available to organize and coordinate energy conservation programs in many smaller communities; consumers' rights to energy conservation information and assistance should not hinge on the size of the utility that serves them; in the short run, public power systems of all sizes should offer residential energy conservation assistance to their consumers, because such assistance is desirable, necessary, and in the public interest; and in the long run, such programs will complement national energy goals and will produce economic benefits for both consumers and the public power system. A detailed description of home audit program planning, organization, and management are given. (MCW)

  17. 40 CFR 30.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management. 30.20 Section 30.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... Program Management § 30.20 Purpose of financial and program management. Sections 30.21 through 30.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  18. 40 CFR 30.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management. 30.20 Section 30.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... Program Management § 30.20 Purpose of financial and program management. Sections 30.21 through 30.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  19. About the Federal Energy Management Program

    SciTech Connect

    Richard Kidd

    2009-04-23

    Richard Kidd, Program Manager for the Federal Energy Management Program (FEMP), presents a discussion on FEMP direction and its future role, federal funding trends, future financing trends, and Earth Day observations.

  20. Management of a coordinated parts program

    NASA Technical Reports Server (NTRS)

    Krishnan, G. S.

    1997-01-01

    The organization of the management of a parts program is discussed. The organizational structure faced by the parts manager and the advantages and disadvantages of managing a coordinated parts program are analyzed. The reliable operation of an instrument is the key to the success of the mission, together with the management of the parts program. The analysis led to the conclusion that the setting up of the decision support model will aid the parts manager in the decision making and the process control.

  1. 75 FR 9017 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  2. 75 FR 52590 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  3. 76 FR 34124 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  4. 76 FR 11847 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  5. 75 FR 29811 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-27

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  6. 76 FR 58077 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  7. 76 FR 27743 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of RTCA Program Management Committee meeting. SUMMARY: The FAA is issuing this notice to advise the public of a meeting of the RTCA Program Management Committee. DATES:...

  8. Management of acute neurorehabilitation programs.

    PubMed

    Vogl, Susan M

    2011-06-01

    Outcome management, performance improvement, evidence-based practice, and policy payment mechanisms are critical operational drivers at every level of health care delivery. It is essential that all health care providers involved in patient care have a working knowledge of health care operations, including the policies and reimbursement mechanisms that drive their particular clinical practice. Providing excellent patient care includes understanding health care policies, regulations, and outcomes that have a historical and current impact on health care delivery. Some of these factors include patient access, patient safety, and information measurement and management. Inpatient acute neurorehabilitation programs have standard outcome measures and a unique set of fiscal rules and regulations. This article discusses the most common variables and terms found in program evaluation systems for acute neurorehabilitation programs as well as some of the clinical and regulatory requirements and reimbursement and level-of-care considerations that are critical for neurorehabilitation health care practitioners. The current health care environment requires providers to understand and continually evaluate quality outcomes, patient access, and patient safety, all within the confines of an efficacy-based care delivery system. PMID:22810871

  9. Hospitality Management. Florida Vocational Program Guide.

    ERIC Educational Resources Information Center

    Florida State Univ., Tallahassee. Center for Instructional Development and Services.

    This program guide is intended for the implementation of a hospitality management program in Florida secondary and postsecondary schools. The program guide describes the program content and structure, provides a program description, describes jobs under the program, and includes a curriculum framework and student performance standards for…

  10. Total quality management program planning

    SciTech Connect

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  11. 22 CFR 518.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods...

  12. 2 CFR 215.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Purpose of financial and program management... Financial and Program Management § 215.20 Purpose of financial and program management. Sections 215.21 through 215.28 prescribe standards for financial management systems, methods for making payments and...

  13. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office...

  14. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office...

  15. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office...

  16. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office...

  17. 41 CFR 109-1.5002 - Personal property management program objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Personal property management program objectives. 109-1.5002 Section 109-1.5002 Public Contracts and Property Management Federal... program objectives. The objectives of the DOE personal property management program are to provide: (a)...

  18. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office...

  19. 22 CFR 145.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Purpose of financial and program management... Financial and Program Management § 145.20 Purpose of financial and program management. Sections 145.21 through 145.28 prescribe standards for financial management systems, methods for making payments and...

  20. 32 CFR 32.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Purpose of financial and program management. 32... Program Management § 32.20 Purpose of financial and program management. Sections 32.21 through 32.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  1. 7 CFR 3019.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Purpose of financial and program management. 3019.20... Requirements Financial and Program Management § 3019.20 Purpose of financial and program management. Sections 3019.21 through 3019.28 prescribe standards for financial management systems, methods for...

  2. 22 CFR 145.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Purpose of financial and program management... Financial and Program Management § 145.20 Purpose of financial and program management. Sections 145.21 through 145.28 prescribe standards for financial management systems, methods for making payments and...

  3. 7 CFR 3019.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Purpose of financial and program management. 3019.20... Requirements Financial and Program Management § 3019.20 Purpose of financial and program management. Sections 3019.21 through 3019.28 prescribe standards for financial management systems, methods for...

  4. 32 CFR 32.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Purpose of financial and program management. 32... Program Management § 32.20 Purpose of financial and program management. Sections 32.21 through 32.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  5. 34 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Purpose of financial and program management. 74.20... Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making...

  6. 7 CFR 3019.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Purpose of financial and program management. 3019.20... Requirements Financial and Program Management § 3019.20 Purpose of financial and program management. Sections 3019.21 through 3019.28 prescribe standards for financial management systems, methods for...

  7. 34 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Purpose of financial and program management. 74.20... Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making...

  8. 7 CFR 3019.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Purpose of financial and program management. 3019.20... Requirements Financial and Program Management § 3019.20 Purpose of financial and program management. Sections 3019.21 through 3019.28 prescribe standards for financial management systems, methods for...

  9. 32 CFR 32.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 1 2014-07-01 2014-07-01 false Purpose of financial and program management. 32... Program Management § 32.20 Purpose of financial and program management. Sections 32.21 through 32.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  10. 22 CFR 518.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods...

  11. 22 CFR 518.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods...

  12. 7 CFR 3019.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Purpose of financial and program management. 3019.20... Requirements Financial and Program Management § 3019.20 Purpose of financial and program management. Sections 3019.21 through 3019.28 prescribe standards for financial management systems, methods for...

  13. 34 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Purpose of financial and program management. 74.20... Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making...

  14. 32 CFR 32.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 1 2013-07-01 2013-07-01 false Purpose of financial and program management. 32... Program Management § 32.20 Purpose of financial and program management. Sections 32.21 through 32.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  15. 22 CFR 518.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods...

  16. 22 CFR 145.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Purpose of financial and program management... Financial and Program Management § 145.20 Purpose of financial and program management. Sections 145.21 through 145.28 prescribe standards for financial management systems, methods for making payments and...

  17. 32 CFR 32.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Purpose of financial and program management. 32... Program Management § 32.20 Purpose of financial and program management. Sections 32.21 through 32.28 prescribe standards for financial management systems, methods for making payments and rules for:...

  18. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2002-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education.

  19. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2001-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA' objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  20. University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2004-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  1. Education outreach programs at the Eastern Washington Section

    SciTech Connect

    Schwarz, R.A.

    1998-09-01

    The Eastern Washington Section of the American Nuclear Society (ANS) has tried a number of different approaches to reach out to the local communities and to work alongside educators to increase their awareness of nuclear technology. Some of the programs that the authors have started may serve as examples for other sections in their outreach activities. The Eastern Washington Section of the ANS has an education committee coordinator who is assigned the task of working with high school and college students to increase the awareness of nuclear energy. The most effective approach that the authors have found to reach out to the area schools is to get directly involved with community activities that already interface with the schools and get to know the science teachers at the local schools. The Hanford project has a student internship program called ``Inquiry into Science``. The program allows students to work at Hanford for Science credits. Another program that the local section sponsors is grants to high schools to promote the awareness of nuclear technology. The local section has also worked alongside local community groups to increase nuclear science education. For years the authors have been active in the local science fair, providing awards to nuclear-related science projects. Other community events that the ANS has been involved in include the US Department of Energy Knowledge Bowl and National Engineers.

  2. Florida Statewide Assessment Program 1971-72 Technical Report; Section 1: Introduction, Procedures, and Program Recommendations.

    ERIC Educational Resources Information Center

    Haynes, Judy L.; Impara, James C.

    The first section of a four-part technical report of Florida's statewide program for assessing reading-related skills in grades 2 and 4 provides an introduction to the program, a description of procedures used, and recommendations regarding program operation. Program background, design, and responsibility for assessment activities are discussed in…

  3. Programs for the Gifted - Site Management. Revised 1977.

    ERIC Educational Resources Information Center

    Heppell, Helen M.

    The manual is designed to help educational personnel handle day-to-day responsibilities and managment of programs for the gifted in the San Diego City schools. The first section explores program maintenance and describes services, identifies departmental sources, and offers suggestions for optimum use of services. The second and third sections…

  4. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Section 3 Program Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ... Implementation and Coordination Grant AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice... of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department... receive funds under the Section 3 Program Implementation and Coordination NOFA. The information...

  5. Emerging Accountability Systems within Part C and Section 619 Programs

    ERIC Educational Resources Information Center

    Freund, Maxine; Ohlson, Cheryl; Browne, Barbara; Kavulic, Christy

    2006-01-01

    Within recent years, federal legislation has required schools to develop and implement standards-based accountability systems for the purposes of evaluating their performance. Although the implementation of accountability systems for K-12 programs is well underway, the design and implementation of such systems for Part C and Section 619 programs…

  6. Cryogenic fluid management program at MSFC

    NASA Technical Reports Server (NTRS)

    Schmidt, G. R.; Hastings, L. J.

    1990-01-01

    Cryogenic fluid management (CFM) is an important aspect in the design and operation of spacecraft propellant systems. Consequently, it represents a key technology in the development of future vehicles for orbital transfer, lunar transit and manned interplanetary (i.e., Mars) missions. Because of Marshall Space Flight Center's (MSFC's) leading role in the definition of such vehicles, the center is currently managing and conducting a variety of tests to support development of this technology. The purpose of this paper is to summarize these activities and present their status within the context of CFM technology requirements. The first section reviews MSFC's role, identifies the major emphases and thrusts of its program, and presents the overall schedule. The final part comprises the bulk of the report, and describes at length the objectives, approach and status of each project.

  7. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  8. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  9. 75 FR 63480 - Medicaid Program: Implementation of Section 614 of the Children's Health Insurance Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... HUMAN SERVICES Medicaid Program: Implementation of Section 614 of the Children's Health Insurance... Children's Health Insurance Program Reauthorization Act of 2009 (CHIPRA), Public Law 111-3. Section 614... Security Act and for child health assistance expenditures under the Children's Health Insurance...

  10. 15 CFR 14.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management. 14.20 Section 14.20 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.20 Purpose of financial and program management. Sections 14.21 through 14.28 prescribe standards...

  11. 28 CFR 70.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management. 70.20 Section 70.20 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) UNIFORM..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards...

  12. 28 CFR 70.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management. 70.20 Section 70.20 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) UNIFORM..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards...

  13. 15 CFR 14.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... management. 14.20 Section 14.20 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.20 Purpose of financial and program management. Sections 14.21 through 14.28 prescribe standards...

  14. 28 CFR 70.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management. 70.20 Section 70.20 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) UNIFORM..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards...

  15. 28 CFR 70.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management. 70.20 Section 70.20 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) UNIFORM..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards...

  16. 15 CFR 14.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... management. 14.20 Section 14.20 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.20 Purpose of financial and program management. Sections 14.21 through 14.28 prescribe standards...

  17. 40 CFR 30.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.20 Purpose of financial and program management. Sections 30.21 through 30.28... management. 30.20 Section 30.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND...

  18. 28 CFR 70.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards for... management. 70.20 Section 70.20 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED)...

  19. Management Training Program in a Discount Store.

    ERIC Educational Resources Information Center

    Sethi, Manmohan Singh

    This study inquired into the objectives of management training programs in two chains of discount stores, and whether those who complete training believe that program objectives have been met. Questionnaire interviews were held with two managers and four trainees from one chain, and with two managers and two trainees from the other. Ten hypotheses…

  20. Waste Management Technician Partnership Program. Final Report.

    ERIC Educational Resources Information Center

    Campbell, Donna

    This final report for Columbia Basin College's waste management technician partnership program outlines 4 objectives: (1) develop at least 4 waste management competency-based curriculum modules; (2) have 50 participants complete at least 1 module; (3) have 100 participants complete a training and/or certification program and 200 managers complete…

  1. 76 FR 74842 - RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... Federal Aviation Administration RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management Committee... Management Committee DATES: The meeting will be held December 13, 2011, from 8:30 a.m.-1:30 p.m....

  2. Evaluating and Selecting Sport Management Undergraduate Programs.

    ERIC Educational Resources Information Center

    Cuneen, Jacquelyn; Sidwell, M. Joy

    1998-01-01

    States that the accelerated growth of sport management undergraduate programs that began in the 1980s has continued into the current decade. There are currently 180 sport management major programs in American colleges and universities. Describes the sports management approval process and suggests useful strategies to evaluate sport management…

  3. Disease management: program design, development, and implementation.

    PubMed

    Harvey, N; DePue, D M

    1997-06-01

    Disease management is an emerging approach to patient management, customer satisfaction, and cost containment that comprises disease modeling; patient segmentation and risk assessment; clinical protocols; and wellness, self-management, and education. Implementing a disease management program poses significant challenges to healthcare organizations. To successfully implement a disease management program, a tightly integrated continuum of care, sophisticated information systems, and disease management support systems must be in place. Strategic partnerships with outside vendors may speed program implementation and provide opportunities to develop risk-sharing relationships. PMID:10167840

  4. Student Loan Programs: Management and Collection.

    ERIC Educational Resources Information Center

    Dorian, James C.; Ward, Diane M.

    This guide to undergraduate and graduate student loan programs focuses primarily on program administration and management in the context of student loan repayment and collection. By incorporating regulatory requirements with practical suggestions on managing student loan programs, the book provides a framework and a guide for those who are…

  5. Program Management Collection. "LINCS" Resource Collection News

    ERIC Educational Resources Information Center

    Literacy Information and Communication System, 2011

    2011-01-01

    This edition of "'LINCS' Resource Collection News" features the Program Management Collection, which covers the topics of Assessment, Learning Disabilities, and Program Improvement. Each month Collections News features one of the three "LINCS" (Literacy Information and Communication System) Resource Collections--Basic Skills, Program Management,…

  6. Evaluation of the Arkansas Medicaid Primary Care Physician Management Program

    PubMed Central

    Muller, Andreas; Baker, John A.

    1996-01-01

    Arkansas implemented a primary-care case-management program in February 1994. This study evaluates the program during its first 17 months. Using quarterly data collected for the Health Care Financing Administration (HCFA), a pooled cross-sectional time series analysis (1991:4-1995:2) estimates the effect of eligibles' program enrollment on expenditure (total, inpatient hospital, outpatient hospital, physicians, prescription drugs, laboratory and X-ray) and utilization measures (outpatient visits, physician visits, prescription drugs). The Arkansas Medicaid managed care program appears to have somewhat reduced growth in total vendor payments and also appears to have improved access to primary medical services. PMID:10165704

  7. Total quality management -- Remedial actions planning program

    SciTech Connect

    Petty, J.L.; Horne, T.E.

    1989-01-01

    This paper describes the management approach being taken within the Hazardous Waste Remedial Actions Program (HAZWRAP) Support Contractor Office (SCO) to ensure quality of services in a highly competitive waste management environment. An overview is presented of the contractor support role assigned to Martin Marietta Energy Systems, Inc., by the Department of Energy (DOE) national program for managing hazardous waste. The HAZWRAP SCO mission, organizational structure, and major programs are outlined, with emphasis on waste management planning for the DOE Work for Others (WFO) Program. The HAZWRAP SCO provides waste management technical support, via interagency agreements between DOE and various Department of Defense (DOD) agencies for DOD sponsors planning remedial response actions. The remainder of the paper focuses on how the concept of Total Quality Management is applied to the HAZWRAP Remedial Actions Planning (RAP) Program. The management challenge is to achieve quality on a ''system'' basis where all functional elements of program management synergistically contribute to the total quality of the effort. The quality assurance (QA) program requirements applied to the RAP Program and its subcontractors are discussed. The application of management principles in the areas of program management, procurement, and QA to achieve total quality is presented. 3 refs.

  8. Health Careers Opportunity Program (HCOP). Section 787 (Public Health Service Act). Program Guide.

    ERIC Educational Resources Information Center

    Department of Health and Human Services, Washington, DC.

    This document summarizes the requirements and guidelines for the Health Careers Opportunity Program (HCOP). This program is authorized by Section 787 of the Public Health Service Act to make grants to and contracts with postsecondary institutions to carry out programs which assist individuals from disadvantaged backgrounds to enter and graduate…

  9. Material Management Program Can Attract Local Industry

    ERIC Educational Resources Information Center

    Magad, Eugene L.

    1978-01-01

    Describes the material management certificate and the associate in applied science degree programs at William Rainey Harper College, Palatine, Illinois. Material management functions include purchasing, production control, inventory control, material handling, warehousing, packaging, computer applications, and transportation. (MF)

  10. Adaptive Management Implementation: Glen Canyon Dam Adaptive Management Program Trinity River Restoration Program

    USGS Publications Warehouse

    Wittler, R.; McBain, S.; Stalnaker, C.; Bizier, P.; DeBarry, P.

    2003-01-01

    Two adaptive management programs, the Glen Canyon Dam Adaptive Management Program (GCDAMP) and the Trinity River Restoration Program (TRRP) are examined. In both cases, the focus is on managing the aquatic and riparian systems downstream of a large dam and water supply project. The status of the two programs, lessons learned by the program managers and the Adaptive Environmental Assessment and Management (AEAM) evolution of the TRRP are discussed. The Trinity River illustrates some of the scientific uncertainities that a program faces and the ways the program evolves from concept through implementation.

  11. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  12. Mixed Waste Management Facility (MWMF) closure, Savannah River Plant: Clay cap test section construction report

    SciTech Connect

    Not Available

    1988-02-26

    This report contains appendices 3 through 6 for the Clay Cap Test Section Construction Report for the Mixed Waste Management Facility (MWMF) closure at the Savannah River Plant. The Clay Cap Test Program was conducted to evaluate the source, lab. permeability, in-situ permeability, and compaction characteristics, representative of kaolin clays from the Aiken, South Carolina vicinity. (KJD)

  13. Horse Training and Management: Program of Excellence.

    ERIC Educational Resources Information Center

    Lane, Marvin

    This report on Lamar Community College's Horse Training and Management (HTM) program assesses the quality of the educational experience provided by the program, the quality of the faculty and students, institutional financial commitment to the program, contribution of the HTM program to state and local economic development, and external funding…

  14. 41 CFR 301-73.1 - What does the Federal travel management program include?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... travel management program include? 301-73.1 Section 301-73.1 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 73-TRAVEL PROGRAMS General Rules § 301-73.1 What does the Federal travel management program include? The...

  15. 30 CFR 556.20 - Consideration of coastal zone management program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Consideration of coastal zone management program. 556.20 Section 556.20 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE... Program § 556.20 Consideration of coastal zone management program. In the development of the...

  16. 30 CFR 556.20 - Consideration of coastal zone management program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Consideration of coastal zone management program. 556.20 Section 556.20 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE... Program § 556.20 Consideration of coastal zone management program. In the development of the...

  17. 30 CFR 556.20 - Consideration of coastal zone management program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Consideration of coastal zone management program. 556.20 Section 556.20 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE... Program § 556.20 Consideration of coastal zone management program. In the development of the...

  18. 20 CFR 435.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Purpose of financial and program management... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.20 Purpose of financial and program management. Sections 435.21 through 435.28 prescribe standards...

  19. 45 CFR 2543.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Purpose of financial and program management. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards...

  20. 20 CFR 435.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Purpose of financial and program management... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.20 Purpose of financial and program management. Sections 435.21 through 435.28 prescribe standards...

  1. 45 CFR 2543.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Purpose of financial and program management. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards...

  2. 45 CFR 2543.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Purpose of financial and program management. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards...

  3. 20 CFR 435.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Purpose of financial and program management... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.20 Purpose of financial and program management. Sections 435.21 through 435.28 prescribe standards...

  4. 20 CFR 435.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Purpose of financial and program management... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.20 Purpose of financial and program management. Sections 435.21 through 435.28 prescribe standards...

  5. 45 CFR 2543.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Purpose of financial and program management. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards...

  6. 34 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74... 34 Education 1 2010-07-01 2010-07-01 false Purpose of financial and program management....

  7. 45 CFR 2543.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.20 Purpose of financial and program management. Sections 2543.21 through 2543.25 prescribe standards for... 45 Public Welfare 4 2010-10-01 2010-10-01 false Purpose of financial and program management....

  8. 45 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Purpose of financial and program management. 74.20... Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments, and rules for satisfying...

  9. 45 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Purpose of financial and program management. 74.20... Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments, and rules for satisfying...

  10. 45 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Purpose of financial and program management. 74.20... Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments, and rules for satisfying...

  11. Program and Curriculum Trends in Sport Management.

    ERIC Educational Resources Information Center

    Case, Bob; And Others

    A study assessed the present status of professional preparation programs in sport management at 134 four-year colleges and universities throughout the United States. The study survey attempted to find answers to four questions: (1) Has the number of professional preparation programs in sport management increased during the past three years? (2) Is…

  12. Program Evaluation: Two Management-Oriented Samples

    ERIC Educational Resources Information Center

    Alford, Kenneth Ray

    2010-01-01

    Two Management-Oriented Samples details two examples of the management-oriented approach to program evaluation. Kenneth Alford, a doctorate candidate at the University of the Cumberlands, details two separate program evaluations conducted in his school district and seeks to compare and contrast the two evaluations based upon the characteristics of…

  13. Guide for Managers of Adult Education Programs.

    ERIC Educational Resources Information Center

    Hudson River Center for Program Development, Glenmont, NY.

    This document is intended to help adult education program managers throughout New York become oriented to the world of adult education, handle their new responsibilities as program managers, and obtain up-to-date information to assist them in making educational and administrative decisions. The following are among the topics discussed in the…

  14. Hospital program weds case, disease management.

    PubMed

    1997-10-01

    To lower its readmission rates and inpatient length of stay for three high-volume chronic conditions, Memorial Hospital in Colorado Springs, CO, developed a program that combines clinical pathways with a cross-continuum disease management program. Community physicians refer patients to the program. Hospital-based care managers guide patients in the acute setting before handing them off to outpatient case managers, who coordinate the patient's transition to home care. Clinicians at Memorial sold administrators on the "care-case management" approach by arguing that increased inpatient efficiency would offset potential revenue shortfalls due to fewer admissions.

  15. The Xyrem risk management program.

    PubMed

    Fuller, David E; Hornfeldt, Carl S; Kelloway, Judy S; Stahl, Pamela J; Anderson, Todd F

    2004-01-01

    Sodium oxybate, also known as gamma-hydroxybutyric acid (GHB), was discovered in 1960 and has been described both as a therapeutic agent with high medical value and, more recently, a substance of abuse. The naturally occurring form of this drug is found in various body tissues but has been studied most extensively in the CNS where its possible function as a neurotransmitter continues to be studied. Sodium oxybate has been approved in different countries for such varied uses as general anaesthesia, the treatment of alcohol withdrawal and addiction, and, most recently, cataplexy associated with narcolepsy. During the 1980s, easy access to GHB-containing products led to various unapproved uses, including weight loss, bodybuilding and the treatment of sleeplessness, sometimes with serious long-term effects. The availability of these unapproved and unregulated forms of the drug led to GHB and its analogues being popularised as substances of abuse and subsequent notoriety as agents used in drug-facilitated sexual assault, or 'date rape', eventually leading to the prohibition of GHB sales in the US. Legal efforts to control the sale and distribution of GHB and its analogues nearly prevented the clinical development of sodium oxybate for narcolepsy in the US. However, following extensive discussions with a variety of interested parties, a satisfactory solution was devised, including legislative action and the development of the Xyrem Risk Management Program. Amendments to the US Controlled Substances Act made GHB a schedule I drug, but also contained provisions that allow US FDA-approved products to be placed under schedule III. This unique, bifurcated schedule for sodium oxybate/GHB allowed the clinical development of sodium oxybate to proceed and, in July 2002, it was approved by the FDA as an orphan drug for the treatment of cataplexy in patients with narcolepsy as Xyrem(sodium oxybate) oral solution. To promote the safe use of sodium oxybate, as well as alleviate

  16. The Xyrem risk management program.

    PubMed

    Fuller, David E; Hornfeldt, Carl S; Kelloway, Judy S; Stahl, Pamela J; Anderson, Todd F

    2004-01-01

    Sodium oxybate, also known as gamma-hydroxybutyric acid (GHB), was discovered in 1960 and has been described both as a therapeutic agent with high medical value and, more recently, a substance of abuse. The naturally occurring form of this drug is found in various body tissues but has been studied most extensively in the CNS where its possible function as a neurotransmitter continues to be studied. Sodium oxybate has been approved in different countries for such varied uses as general anaesthesia, the treatment of alcohol withdrawal and addiction, and, most recently, cataplexy associated with narcolepsy. During the 1980s, easy access to GHB-containing products led to various unapproved uses, including weight loss, bodybuilding and the treatment of sleeplessness, sometimes with serious long-term effects. The availability of these unapproved and unregulated forms of the drug led to GHB and its analogues being popularised as substances of abuse and subsequent notoriety as agents used in drug-facilitated sexual assault, or 'date rape', eventually leading to the prohibition of GHB sales in the US. Legal efforts to control the sale and distribution of GHB and its analogues nearly prevented the clinical development of sodium oxybate for narcolepsy in the US. However, following extensive discussions with a variety of interested parties, a satisfactory solution was devised, including legislative action and the development of the Xyrem Risk Management Program. Amendments to the US Controlled Substances Act made GHB a schedule I drug, but also contained provisions that allow US FDA-approved products to be placed under schedule III. This unique, bifurcated schedule for sodium oxybate/GHB allowed the clinical development of sodium oxybate to proceed and, in July 2002, it was approved by the FDA as an orphan drug for the treatment of cataplexy in patients with narcolepsy as Xyrem(sodium oxybate) oral solution. To promote the safe use of sodium oxybate, as well as alleviate

  17. Do employee health management programs work?

    PubMed

    Serxner, Seth; Gold, Daniel; Meraz, Angela; Gray, Ann

    2009-01-01

    Current peer review literature clearly documents the economic return and Return-on-Investment (ROI) for employee health management (EHM) programs. These EHM programs are defined as: health promotion, self-care, disease management, and case management programs. The evaluation literature for the sub-set of health promotion and disease management programs is examined in this article for specific evidence of the level of economic return in medical benefit cost reduction or avoidance. The article identifies the methodological challenges associated with determination of economic return for EHM programs and summarizes the findings from 23 articles that included 120 peer review study results. The article identifies the average ROI and percent health plan cost impact to be expected for both types of EHM programs, the expected time period for its occurrence, and caveats related to its measurement.

  18. Cost reduction programs for capital asset management.

    PubMed

    Bluemke, D H

    1993-01-01

    Mr. Bluemke argues that healthcare institutions should include capital asset management in their CQI/TQM programs to gain the best cost reduction from those programs. He cites a recent survey of hospital executives that asked which of the potential benefits of capital asset management programs would have the most value for their institutions. Mr. Bluemke believes that cost reduction can be better achieved by hospitals finding more efficient ways of doing business than through government intervention.

  19. 10 CFR 600.120 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose of financial and program management. 600.120 Section 600.120 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS FINANCIAL ASSISTANCE RULES... financial and program management. Sections 600.121 through 600.128 prescribe standards for...

  20. Heavy-section steel technology program. Semiannual progress report, October 1994--March 1995

    SciTech Connect

    Pennell, W.E.

    1996-07-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the Nuclear Regulatory Commission (NRC) by Oak Ridge National Laboratory (ORNL). The program focus is on the development and validation of technology for the assessment of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in seven tasks: (1) program management (2) constraint effects analytical development and validation, (3) evaluation of cladding effects, (4) ductile-to-cleavage fracture-mode conversion, (5) fracture analysis methods development and applications, (6) material property data and test methods, and (7) integration of results. The program tasks have been structured to place emphasis on the resolution of fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel Irradiation Program at ORNL and with related research programs both in the United States and abroad. This report provides an overview of principal developments in each of the seven program tasks from October 1994-March 1995.

  1. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Program Management Plans. 385.25 Section 385.25 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP...

  2. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) §...

  3. 18 CFR 260.400 - Cash management programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Cash management programs. 260.400 Section 260.400 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) §...

  4. 41 CFR 102-194.5 - What is the Standard and Optional Forms Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is the Standard and Optional Forms Management Program? 102-194.5 Section 102-194.5 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION...

  5. 24 CFR 5.615 - Public housing program and Section 8 tenant-based assistance program: How welfare benefit...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Public housing program and Section... Development GENERAL HUD PROGRAM REQUIREMENTS; WAIVERS Section 8 and Public Housing, and Other HUD Assisted... Section 8 Project-Based Assistance Family Income § 5.615 Public housing program and Section 8...

  6. Hanford Environmental Management Program plan; Revision 1

    SciTech Connect

    DeFigh-Price, C.

    1990-08-01

    The Hanford Environmental Management Program (HEMP) was established in November 1986 by the US Department of Energy-Richland Operations Office. Westinghouse Hanford Company has been assigned responsibility to manage this program. The program`s goal is to integrate environmental activities such as regulatory reporting and planning and to facilitate compliance with environmental regulations. Key activities include preparing and/or coordinating waste management and environmental restoration site-wide planning documents, maintaining the Waste Inventory Data System, coordinating site-wide regulatory reporting (SARA Title III, Dangerous Waste Report, etc.), Tri-Party Agreement Administration and Base (nonprogram specific) regulatory permitting and National Environmental Policy Act activities. Fiscal year (FY) 1991 is the first year this activity will be directly funded. This document describes accomplishments in FY 1990, the scope of work funded by this program for FY 1991, the prioritized tasks covered, and the management structure in place. 16 refs., 4 figs., 1 tab.

  7. The NBS data management technology program

    NASA Technical Reports Server (NTRS)

    Wood, H. M.

    1984-01-01

    The National Bureau of Standards (NBS) Data Management Technology Program is discussed. The NBS Data Management Technology Program addresses major problems encountered during the following stages of an application's lifetime: requirements analysis and data base design, system selection and implementation, operations management and conversion. Products developed include standard software specifications, guides to best practice, standard data elements and representations, and reports documenting the experiences of other organizations as they attempt to improve the management of their computing resources. Data base Laboratory facilities are maintained for the investigation and analysis of state of the art data base technology. These facilities support collaborative testing with researchers, vendors, users, and standards developers.

  8. Interdisciplinary Programs Focused Populations: The Case of Health Management Program

    ERIC Educational Resources Information Center

    Davidovitch, Nitza; Yavich, Roman

    2015-01-01

    The Ariel University has a unique interdisciplinary program in healthcare management that targets experienced healthcare professionals who wish to earn an academic degree. Only one academic study has been held so far on the integration of graduates of an academic university-level school in healthcare management in the field. In the current study,…

  9. 43 CFR 12.920 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management. 12.920 Section 12.920 Public Lands: Interior Office of the Secretary of the Interior... Organizations Post-Award Requirements § 12.920 Purpose of financial and program management. Sections 12.921 through 12.928 prescribe standards for financial management systems, methods for making payments and...

  10. 43 CFR 12.920 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management. 12.920 Section 12.920 Public Lands: Interior Office of the Secretary of the Interior... Organizations Post-Award Requirements § 12.920 Purpose of financial and program management. Sections 12.921 through 12.928 prescribe standards for financial management systems, methods for making payments and...

  11. 43 CFR 12.920 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management. 12.920 Section 12.920 Public Lands: Interior Office of the Secretary of the Interior... Organizations Post-Award Requirements § 12.920 Purpose of financial and program management. Sections 12.921 through 12.928 prescribe standards for financial management systems, methods for making payments and...

  12. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  13. 45 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Purpose of financial and program management. 74.20... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER... Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28...

  14. 24 CFR 84.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Program Management § 84.20 Purpose of financial and program management. Sections 84.21 through 84.28 prescribe standards for financial management systems, methods for making payments and rules for... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Purpose of financial and...

  15. 36 CFR 1210.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Financial and Program Management § 1210.20 Purpose of financial and program management. Sections 1210.21 through 1210.28 prescribe standards for financial management systems, methods for making payments and... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Purpose of financial...

  16. 10 CFR 600.310 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose of financial and program management. 600.310... Requirements § 600.310 Purpose of financial and program management. Sections 600.311 through 600.318 prescribe standards for financial management systems; methods for making payments; and rules for cost sharing...

  17. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Which program levels should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... volume of outgoing mail that is put into the mail stream by the program itself or by printers,...

  18. 41 CFR 102-192.145 - Which program levels should have a mail manager?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Which program levels should have a mail manager? 102-192.145 Section 102-192.145 Public Contracts and Property Management... volume of outgoing mail that is put into the mail stream by the program itself or by printers,...

  19. 49 CFR 19.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Purpose of financial and program management. 19.20... ORGANIZATIONS Post-Award Requirements § 19.20 Purpose of financial and program management. Sections 19.21 through 19.28 prescribe standards for financial management systems, methods for making payments and...

  20. 49 CFR 19.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Purpose of financial and program management. 19.20... ORGANIZATIONS Post-Award Requirements § 19.20 Purpose of financial and program management. Sections 19.21 through 19.28 prescribe standards for financial management systems, methods for making payments and...

  1. 49 CFR 19.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Purpose of financial and program management. 19.20... ORGANIZATIONS Post-Award Requirements § 19.20 Purpose of financial and program management. Sections 19.21 through 19.28 prescribe standards for financial management systems, methods for making payments and...

  2. 49 CFR 19.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Purpose of financial and program management. 19.20... ORGANIZATIONS Post-Award Requirements § 19.20 Purpose of financial and program management. Sections 19.21 through 19.28 prescribe standards for financial management systems, methods for making payments and...

  3. 10 CFR 600.120 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Purpose of financial and program management. 600.120... financial and program management. Sections 600.121 through 600.128 prescribe standards for financial management systems, methods for making payments and rules for satisfying cost sharing and...

  4. 10 CFR 600.120 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Purpose of financial and program management. 600.120... financial and program management. Sections 600.121 through 600.128 prescribe standards for financial management systems, methods for making payments and rules for satisfying cost sharing and...

  5. 49 CFR 19.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Purpose of financial and program management. 19.20... ORGANIZATIONS Post-Award Requirements § 19.20 Purpose of financial and program management. Sections 19.21 through 19.28 prescribe standards for financial management systems, methods for making payments and...

  6. 43 CFR 12.920 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Purpose of financial and program management... Organizations Post-Award Requirements § 12.920 Purpose of financial and program management. Sections 12.921 through 12.928 prescribe standards for financial management systems, methods for making payments and...

  7. 10 CFR 600.120 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Purpose of financial and program management. 600.120... financial and program management. Sections 600.121 through 600.128 prescribe standards for financial management systems, methods for making payments and rules for satisfying cost sharing and...

  8. 10 CFR 600.120 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Purpose of financial and program management. 600.120... financial and program management. Sections 600.121 through 600.128 prescribe standards for financial management systems, methods for making payments and rules for satisfying cost sharing and...

  9. Economic value evaluation in disease management programs.

    PubMed

    Magnezi, Racheli; Reicher, Sima; Shani, Mordechai

    2008-05-01

    Chronic disease management has been a rapidly growing entity in the 21st century as a strategy for managing chronic illnesses in large populations. However, experience has shown that disease management programs have not been able to demonstrate their financial value. The objectives of disease management programs are to create quality benchmarks, such as principles and guidelines, and to establish a uniform set of metrics and a standardized methodology for evaluating them. In order to illuminate the essence of disease management and its components, as well as the complexity and the problematic nature of performing economic calculations of their profitability and value, we collected data from several reports that dealt with the economic intervention of disease management programs. The disease management economic evaluation is composed of a series of steps, including the following major categories: data/information technology, information generation, assessment/recommendations, actionable customer plans, and program assessment/reassessment. We demonstrate the elements necessary for economic analysis. Disease management is one of the most innovative tools in the managed care environment and is still in the process of being defined. Therefore, objectives should include the creation of quality measures, such as principles and guidelines, and the establishment of a uniform set of metrics and a standardized methodology for evaluating them.

  10. 40 CFR 501.11 - Elements of a sludge management program submission.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Elements of a sludge management program submission. 501.11 Section 501.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Programs § 501.11 Elements of a sludge management program submission. (a) Any State that seeks...

  11. 40 CFR 501.11 - Elements of a sludge management program submission.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Elements of a sludge management program submission. 501.11 Section 501.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Programs § 501.11 Elements of a sludge management program submission. (a) Any State that seeks...

  12. 40 CFR 501.11 - Elements of a sludge management program submission.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Elements of a sludge management program submission. 501.11 Section 501.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Programs § 501.11 Elements of a sludge management program submission. (a) Any State that seeks...

  13. 40 CFR 501.11 - Elements of a sludge management program submission.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Elements of a sludge management program submission. 501.11 Section 501.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Programs § 501.11 Elements of a sludge management program submission. (a) Any State that seeks...

  14. 40 CFR 501.11 - Elements of a sludge management program submission.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Elements of a sludge management program submission. 501.11 Section 501.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Programs § 501.11 Elements of a sludge management program submission. (a) Any State that seeks...

  15. 30 CFR 256.20 - Consideration of coastal zone management program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... program. 256.20 Section 256.20 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE LEASING OF SULPHUR OR OIL AND GAS IN THE OUTER CONTINENTAL SHELF Oil and Gas Leasing Program § 256.20 Consideration of coastal zone management program. In the development of the leasing...

  16. 22 CFR 145.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.20 Purpose of financial and program management. Sections 145.21... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose of financial and program...

  17. Data warehousing in disease management programs.

    PubMed

    Ramick, D C

    2001-01-01

    Disease management programs offer the benefits of lower disease occurrence, improved patient care, and lower healthcare costs. In such programs, the key mechanism used to identify individuals at risk for targeted diseases is the data warehouse. This article surveys recent warehousing techniques from HMOs to map out critical issues relating to the preparation, design, and implementation of a successful data warehouse. Discussions of scope, data cleansing, and storage management are included in depicting warehouse preparation and design; data implementation options are contrasted. Examples are provided of data warehouse execution in disease management programs that identify members with preexisting illnesses, as well as those exhibiting high-risk conditions. The proper deployment of successful data warehouses in disease management programs benefits both the organization and the member. Organizations benefit from decreased medical costs; members benefit through an improved quality of life through disease-specific care.

  18. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  19. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  20. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  1. 30 CFR 402.13 - Program management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....13 Program management. (a) After the conclusion of negotiations, the USGS will transmit a grant or... or USGS acquisition policy documents. OMB Circular A-67 will also apply to some contract awards...

  2. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  3. One System for Blood Program Information Management

    PubMed Central

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  4. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  5. Heavy-Section Steel Technology Program fracture issues

    SciTech Connect

    Pennell, W.E.

    1991-01-01

    Large-scale fracture mechanics tests have resulted in the identification of a number of fracture-technology issues. Identification of additional issues has come from the reactor vessel materials-irradiation test program and from reactor operating experience. This paper provides a review of fracture issues with an emphasis on their potential impact on a reactor vessel pressurized-thermal-shock (PTS) analysis. Mixed-mode crack propagation emerges as a major issue, due in large measure to the poor performance of existing models for the prediction of ductile tearing. Rectification of ductile tearing technology deficiencies may require extending the technology to include a more complete treatment of stress-state and loading history effects. The effect of cladding on vessel fracture remains uncertain to the point that it is not possible to determine at this time if the net effect will be positive or negative. Enhanced fracture toughness for shallow flaws has been demonstrated for low-strength structural steels. Demonstration of a similar effect in reactor pressure vessel steels could have a significant beneficial effect on the probabilistic analysis of reactor vessel fracture. Further development of existing fracture-mechanics models and concepts is required to meet the special requirements for fracture evaluation of circumferential flaws in the welds of ring-forged vessels. Fracture technology advances required to address the issues discussed in this paper are the major objective for the ongoing Heavy-Section Steel Technology (HSST) Program at Oak Ridge National Laboratory (ORNL). 22 refs., 18 figs.

  6. Mixed Waste Management Facility (MWMF) closure, Savannah River Plant: Clay cap test section construction report

    SciTech Connect

    Not Available

    1988-02-26

    This report contains appendix 2 for the Clay Cap Test Section Construction Report for the Mixed Waste Management Facility (MWMF) closure at the Savannah River Plant. The Clay Cap Test Program was conducted to evaluate the source, Laboratory permeability, and compaction characteristics representative of Kaolin clays from the aiken, South Carolina vicinity. Included in this report are daily field reports Nos. 1 to 54. (KJD)

  7. Cryogenic fluid management program flight concept definition

    NASA Technical Reports Server (NTRS)

    Kroeger, Erich

    1987-01-01

    The Lewis Research Center's cryogenic fluid management program flight concept definition is presented in viewgraph form. Diagrams are given of the cryogenic fluid management subpallet and its configuration with the Delta launch vehicle. Information is given in outline form on feasibility studies, requirements definition, and flight experiments design.

  8. UNBC: Outdoor Recreation and Tourism Management Program

    ERIC Educational Resources Information Center

    Maher, Pat

    2007-01-01

    This article describes the University of Northern British Columbia's (UNBC's) Outdoor Recreation and Tourism Management (ORTM) Program, which focuses squarely on the management of outdoor recreation as it relates to conservation (i.e., in and around parks and protected areas), tourism that is both based in and concerned with the natural/cultural…

  9. Fashion Production and Management Program Guide.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Div. of Vocational Education.

    This program guide presents the standard fashion production and management curriculum for technical institutes in Georgia. It is designed to relate primarily to the development of those skills needed to become a qualified alterationist, clothing design assistant, home textiles assistant, fashion management assistant, or tailoring assistant. A…

  10. Software Program: Software Management Guidebook

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

  11. Computer-Aided Corrosion Program Management

    NASA Technical Reports Server (NTRS)

    MacDowell, Louis

    2010-01-01

    This viewgraph presentation reviews Computer-Aided Corrosion Program Management at John F. Kennedy Space Center. The contents include: 1) Corrosion at the Kennedy Space Center (KSC); 2) Requirements and Objectives; 3) Program Description, Background and History; 4) Approach and Implementation; 5) Challenges; 6) Lessons Learned; 7) Successes and Benefits; and 8) Summary and Conclusions.

  12. Community Energy Management Programs for Commercial Building Owners and Managers.

    ERIC Educational Resources Information Center

    Chick, Walter S.

    1987-01-01

    A voluntary program in Ontario encourages the private sector to reduce its energy consumption in commercial buildings by experimenting with innovative building operation techniques. Charts and tables illustrate the outstanding results achieved by program participants. Yearly energy management forums are convened in Toronto and Ottawa. (MLF)

  13. A Natural Resources Management Program

    ERIC Educational Resources Information Center

    Lancaster, George B.

    1977-01-01

    Three years of instruction in natural resources management (NRM) are offered at Louisa County High School, Mineral, Virginia, with 30 acres of land for use as outdoor classrooms. Instructional areas are grouped under forestry; crops and soils; and surveying, air, water, recreation, and general. Two years of basic agriculture science and mechanics…

  14. Risk Management for Wilderness Programs.

    ERIC Educational Resources Information Center

    Schimelpfenig, Tod

    This paper discusses subjective hazards in wilderness activities and suggests means of assessing and managing related risks. Wilderness educators conveniently group hazards into objective and subjective ones. Objective hazards such as rockfall, moving water, and weather, while not necessarily predictable, are visible and understandable. Subjective…

  15. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  16. 76 FR 39857 - Alaska Coastal Management Program Withdrawal From the National Coastal Management Program Under...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... National Oceanic Atmospheric Administration Alaska Coastal Management Program Withdrawal From the National... Coastal Resource Management (OCRM), National Ocean Service (NOS), National Oceanic Atmospheric Administration (NOAA), Department of Commerce (Commerce). ACTION: Notice. SUMMARY: By operation of Alaska...

  17. NASA management of the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Peters, F.

    1975-01-01

    The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.

  18. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  19. Hybrid Power Management Program Continued

    NASA Technical Reports Server (NTRS)

    Eichenberg, Dennis J.

    2002-01-01

    Hybrid Power Management (HPM) is the innovative integration of diverse, state-of-the-art power devices in an optimal configuration for space and terrestrial applications. The appropriate application and control of the various power devices significantly improves overall system performance and efficiency. The advanced power devices include ultracapacitors and photovoltaics. HPM has extremely wide potential with applications including power-generation, transportation, biotechnology, and space power systems. It may significantly alleviate global energy concerns, improve the environment, and stimulate the economy.

  20. Uterocutaneous Fistula Following Cesarean Section: Successful Management of a Case

    PubMed Central

    Maddah, Ghodratollah; Fattahi, Asieh Sadat; Rahnama, Ali; Jamshidi, Shirin Taraz

    2016-01-01

    A uterocutaneous fistula is a rare clinical presentation that occurs following Cesarean section and other pelvic operations. There are only a few reports discussing the treatments. We describe a patient with successful surgical management and review the literature. A 25-year-old woman referred to our department 13 months after her first Cesarean section. She had a history of an abdominal mass and collection 2 months after surgery and some fistula opening with discharge from her previous incision. She had a previous surgical operation and antibiotic therapy without complete response. We performed fistulography to evaluate the tracts. In the operation — she had fistula tracts, one of which was between the uterus and skin. We debrided the necrotic tissue in the uterus, excised the fistula tracts, and drained the uterine cavity. At 8 months’ postoperative follow-up, she had no recurrence. A uterocutaneous fistula is a rare condition with many causes and needs proper investigation and timely medical and surgical management. PMID:26989289

  1. 41 CFR 105-72.300 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Purpose of financial and program management. 105-72.300 Section 105-72.300 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  2. 41 CFR 105-72.300 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Purpose of financial and program management. 105-72.300 Section 105-72.300 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  3. 41 CFR 105-72.300 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Purpose of financial and program management. 105-72.300 Section 105-72.300 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  4. 41 CFR 105-72.300 - Purpose of financial and program management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Purpose of financial and program management. 105-72.300 Section 105-72.300 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  5. 41 CFR 105-72.300 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Purpose of financial and program management. 105-72.300 Section 105-72.300 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional...

  6. Real estate management program implementation handbook

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This handbook provides a ready reference to pertinent policy and guidance for the management of real estate activities in NASA. Real property means buildings, structures, utility systems, and land, along with its permanently connected appurtenances and improvements. The Real Estate Management Program is designed to provide a uniform and orderly process for meeting NASA's programmatic and institutional real estate needs and other real estate management requirements. The purpose of this Real Estate Management Program Implementation Handbook (REMPIH) is to provide guidance and assistance to NASA officials in carrying out their responsibilities for the review, reporting, accounting, acquisition, and disposal of NASA controlled/occupied real estate in accordance with the applicable procedures of 14 CFR 1204.501, 1204.503, 1204.504, and Attachment A to NMI 8800.14. The REMPIH provides a concise, non-technical, and authoritative reference for the efficient management of NASA real estate.

  7. Continuous Risk Management: A NASA Program Initiative

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  8. Nuclear Materials Management Program at the NNSS

    SciTech Connect

    ,

    2012-06-08

    The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was established in 1951 mainly for weapons testing; because special nuclear materials (SNM) were expended during the tests, a nuclear material management program was not required. That changed in December 2004 with the receipt of Category I SNM for purposes other than weapons testing. At that time, Material Control and Accountability and Nuclear Material Management were a joint laboratory (Los Alamos and Lawrence Livermore) effort with nuclear material management being performed at the laboratories. That changed in March 2006 when the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office appointed sole responsibility to the Management and Operations (M&O) contractor, National Security Technologies, LLC (NSTec). Since 2006 the basic nuclear material management work was completed by a combination of M&O employees and subcontractors, but a true Nuclear Material Management (NMM) Program was not determined to be necessary until recently. With expanding missions and more nuclear material (NM) coming to the NNSS, it became imperative to have an organization to manage these materials; therefore, an NMM Manager was officially appointed by NSTec in 2012. In June 2011 a Gap Analysis and white paper was completed by a subcontractor; this presentation will include highlights from those documents along with our plans to resolve the “gaps” and stand up a functional and compliant NMM Program at the NNSS.

  9. Heavy-section steel irradiation program. Progress report, October 1994--March 1995

    SciTech Connect

    Corwin, W.R.

    1995-10-01

    This document is the October 1994-March 1995 Progress Report for the Heavy Section Steel Irradiation Program. The report contains a summary of activities in each of the 14 tasks of the HSSI Program, including: (1) Program management, (2) Fracture toughness shifts in high-copper weldments, (3) Fracture toughness shifts in low upper-shelf welds, (4) Irradiation effects in a commercial low upper-shelf weld, (5) Irradiation effects on weld heat-affected zone and plate materials, (6) Annealing effects in low upper-shelf welds, (7) Microstructural analysis of radiation effects, (8) In-service irradiated and aged material evaluations, (9) Japanese power development reactor vessel steel examination, (10) fracture toughness curve shift method, (11) Special technical assistance, (12) Technical assistance for JCCCNRS, (13) Correlation monitor materials, and (14) Test reactor irradiation coordination. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  10. The configuration management program for the Emergency Management Support System

    SciTech Connect

    Probasco, K M; Stephan, E G

    1991-08-01

    Emergency response software is used increasingly by the US Department of Energy's (DOE's) Emergency Management Project (EMP) personnel at Hanford Site. This software must be reliable, of high quality, and capable of performing critical functions to support assessment of actual or potential consequences of any hazardous accidents onsite or events having potential offsite impacts. To better control the software and ensure its suitability for use as a tool to protect employees, the public, and environment, a method for specifying and certifying its capabilities and documenting its development and implementation was needed. A team of EMP staff, composed of personnel from Pacific Northwest Laboratory (PNL) and Boeing Computer Services- Richland (BCSR) under the direction of PNL EMP, responded to this need by developing a software configuration management program (CMP). This report documents the development of the CMP, including the strategies upon which the CMP is based, and describes the program as it has been implemented for EMS System software. The program relies on the integration of its three primary elements: the configuration management staff, tools, and process. Configuration management staff run the program, using specially designed configuration management forms to guide, document, and track the life cycle of the software. The configuration management process itself is reflected in the instructive forms and summarized in flowcharts representing each phase of the process -- from requirements specification through implementation and maintenance. 7 refs., 9 figs., 1 tab.

  11. 47 CFR 1.1805 - Federal Communications Commission Section 504 Programs and Activities Accessibility Handbook.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Programs and Activities Accessibility Handbook. 1.1805 Section 1.1805 Telecommunication FEDERAL... Communications Commission Section 504 Programs and Activities Accessibility Handbook. The Consumer & Governmental... Accessibility Handbook” (“Section 504 Handbook”) for Commission staff, and shall update the Section 504...

  12. 47 CFR 1.1805 - Federal Communications Commission Section 504 Programs and Activities Accessibility Handbook.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Programs and Activities Accessibility Handbook. 1.1805 Section 1.1805 Telecommunication FEDERAL... Communications Commission Section 504 Programs and Activities Accessibility Handbook. The Consumer & Governmental... Accessibility Handbook” (“Section 504 Handbook”) for Commission staff, and shall update the Section 504...

  13. 76 FR 12217 - Exempt Discretionary Program Grants (Section 5309) for Urban Circulator Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Federal Transit Administration Exempt Discretionary Program Grants (Section 5309) for Urban Circulator Systems AGENCY: Federal Transit Administration (FTA), DOT. ] ACTION: Urban Circulator Systems Announcement... program funds for the Urban Circulator program in support of DOT's Livability Initiative, which...

  14. Organization and management of space grant programs

    NASA Technical Reports Server (NTRS)

    Sheppard, Sallie; Nichols, Steve

    1990-01-01

    The 21 Space Grant Programs represent a broad range of organizational structures which operate programs ranging in size from single university organizations to organizations including up to 41 members involving a composite of industrial organizations such as state agencies, and universities. Some of the space grant awards were made to organizations already in existence with on-going programs while other awards were made to consortia newly formed for the purpose of applying to the Space Grant Program. The workshop on organization and management of Space Grant Programs provided an opportunity for directors and program representatives to discuss and compare the relative advantages and disadvantages of the various models being used. This paper offers examples of the diversity of organizations, summarizes the common concerns to be met by each organizational model, and provides a case study of the Texas Space Grant Consortium organization.

  15. The Marshall Islands Data Management Program

    SciTech Connect

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  16. Cost reduction potential in space program management

    NASA Astrophysics Data System (ADS)

    Tischler, Adelbert O.

    The barrier to low cost space programs has been identified, and we are it. Principal among the causes for escalation of space program costs is the 'system' which has evolved to control programs. The 'system' includes not only the procedures and documents that constitute the flow of paper, the reviews and approvals necessary to initiate actions, and the entire methodology of the decision-making and approval processes but, necessarily, the people, including political as well as industrial counterparts, who populate these environments. This complex 'system' has proliferated so that it now promotes time-taking routines, obstructs prompt action, inhibits decisions, extends schedules and escalates costs. Designed to aid and abet management by supplying information necessary to maintain cognizance of program status the 'system' has taken over the role of management. Problems and their solutions must now be addressed to the 'system' as aided and abetted by management. Most of the evident causes of program cost problems have long since been recognized. Attacking them will produce second-order effects until management is willing to face up to the internal cost driver.

  17. Programmed environment management of confined microsocieties

    NASA Technical Reports Server (NTRS)

    Emurian, Henry H.

    1988-01-01

    A programmed environment is described that assists the implementation and management of schedules governing access to all resources and information potentially available to members of a confined microsociety. Living and work schedules are presented that were designed to build individual and group performance repertoires in support of study objectives and sustained adaptation by participants. A variety of measurement requirements can be programmed and standardized to assure continuous assessment of the status and health of a confined microsociety.

  18. Ada programming guidelines for deterministic storage management

    NASA Technical Reports Server (NTRS)

    Auty, David

    1988-01-01

    Previous reports have established that a program can be written in the Ada language such that the program's storage management requirements are determinable prior to its execution. Specific guidelines for ensuring such deterministic usage of Ada dynamic storage requirements are described. Because requirements may vary from one application to another, guidelines are presented in a most-restrictive to least-restrictive fashion to allow the reader to match appropriate restrictions to the particular application area under investigation.

  19. Pediatric CT quality management and improvement program.

    PubMed

    Larson, David B; Molvin, Lior Z; Wang, Jia; Chan, Frandics P; Newman, Beverley; Fleischmann, Dominik

    2014-10-01

    Modern CT is a powerful yet increasingly complex technology that continues to rapidly evolve; optimal clinical implementation as well as appropriate quality management and improvement in CT are challenging but attainable. This article outlines the organizational structure on which a CT quality management and improvement program can be built, followed by a discussion of common as well as pediatric-specific challenges. Organizational elements of a CT quality management and improvement program include the formulation of clear objectives; definition of the roles and responsibilities of key personnel; implementation of a technologist training, coaching and feedback program; and use of an efficient and accurate monitoring system. Key personnel and roles include a radiologist as the CT director, a qualified CT medical physicist, as well as technologists with specific responsibilities and adequate time dedicated to operation management, CT protocol management and CT technologist education. Common challenges in managing a clinical CT operation are related to the complexity of newly introduced technology, of training and communication and of performance monitoring. Challenges specific to pediatric patients include the importance of including patient size in protocol and dose considerations, a lower tolerance for error in these patients, and a smaller sample size from which to learn and improve.

  20. FDA Compliance Program Guidance Manual. Section VI. Radiological health

    SciTech Connect

    Not Available

    1981-10-01

    The FDA Compliance Program Guidance Manual provides a system for issuing and filing written program plans and instructions directed to Food and Drug Administration field operations for project implementation.

  1. 75 FR 30106 - Terrorism Risk Insurance Program; Litigation Management Submissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... Terrorism Risk Insurance Program; Litigation Management Submissions AGENCY: Departmental Offices. ACTION..., the Terrorism Risk Insurance Program Office is seeking comments regarding Litigation Management..., preferably an original and two copies) to: Terrorism Risk Insurance Program, Public Comment Record,...

  2. Industrial Safety. MAS-123. Waste Isolation Division (WID). Management and Supervisor Training (MAST) Program.

    ERIC Educational Resources Information Center

    Westinghouse Electric Corp., Carlsbad, NM.

    This learning module, which is part of a management and supervisor training program for managers and supervisors employed at the Department of Energy's Waste Isolation Division, is designed to prepare trainees to promote and monitor the industrial safety program at their plant. The following topics are covered in the module's individual sections:…

  3. 12 CFR 615.5181 - Bank interest rate risk management program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Bank interest rate risk management program. 615.5181 Section 615.5181 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM FUNDING AND....5181 Bank interest rate risk management program. (a) The board of directors of each Farm Credit...

  4. 22 CFR 145.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Purpose of financial and program management. 145.20 Section 145.20 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management §...

  5. Federal Government Energy Management and Conservation Programs Fiscal Year 2008

    SciTech Connect

    None, None

    2014-03-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  6. Federal Government Energy Management and Conservation Programs Fiscal Year 2009

    SciTech Connect

    None, None

    2014-03-01

    Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

  7. Sandia National Laboratories, California Waste Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2010-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  8. Sandia National Laboratories, California Hazardous Materials Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2011-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Hazardous Materials Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Hazardous Materials Management Program, one of six programs that supports environmental management at SNL/CA.

  9. Parents are Teachers: A Child Management Program.

    ERIC Educational Resources Information Center

    Becker, Wesley C.

    This manual is designed to help parents apply reinforcement theory in managing their children. The program explains how parents can systematically use consequences to teach children in positive ways. Units include: When to Reinforce; How to Reinforce; Reinforcement and Punishment in Everyday Life; and Why Parents (and Teachers) Goof; the Criticism…

  10. Choosing the Right Database Management Program.

    ERIC Educational Resources Information Center

    Vockell, Edward L.; Kopenec, Donald

    1989-01-01

    Provides a comparison of four database management programs commonly used in schools: AppleWorks, the DOS 3.3 and ProDOS versions of PFS, and MECC's Data Handler. Topics discussed include information storage, spelling checkers, editing functions, search strategies, graphs, printout formats, library applications, and HyperCard. (LRW)

  11. Management System for EMR Work Study Program.

    ERIC Educational Resources Information Center

    Columbia County Board of Public Instruction, Lake City, FL. Exceptional Child Education Dept.

    A computerized information management system involving the specification of objectives, the coding of teacher evaluations of students, and a variety of possible outputs has been used in a work study program for educable mentally retarded adolescents. Instructional objectives are specified and coded by number and category. Evaluation is by means of…

  12. Health Occupations Education Program Management Guide.

    ERIC Educational Resources Information Center

    Iowa Univ., Iowa City. Coll. of Education.

    This final report describes a project to develop a secondary education program management guide for health occupations education in Iowa. Introductory material includes the following: a summary sheet on project objectives, a description of how the objectives were met, the audience served, an educational equity statement, a statement that the…

  13. IMP-32--An Interactive Management Program.

    ERIC Educational Resources Information Center

    Hayes, L. Susan; Vogel, Judith A.

    1982-01-01

    Describes the development by Gould, Inc., S.E.L. Computer Systems Division, of an Information Management Package (IMP-32) for use in administration of the company's technical information center. Designing the system, the programs which are components of the system, and system functions are discussed. Included are eight figures illustrating system…

  14. Toward a Distinctive Christian Undergraduate Management Program

    ERIC Educational Resources Information Center

    Smith, Thomas M.; VanderVeen, Steve

    2008-01-01

    We motivate and develop a theoretical framework for creating a distinctive Christian undergraduate management program that is directed toward providing (a) the necessary intellectual characteristics to do "well" and (b) the necessary emotional characteristics to do "good." This framework consists of seven propositions that connect the learning…

  15. FDA (Food and Drug Administration) Compliance Program Guidance Manual. Section 4. Medical and radiological devices. Basic section. (FY-89)

    SciTech Connect

    Not Available

    1989-01-01

    The Food and Drug Administration (FDA) Compliance Program Guidance Manual provides a system for issuing and filing program plans and instructions directed to the Food and Drug Administration Field operations for project implementation. Section IV provides those chapters of the Compliance Program Guidance Manual which pertain to the areas of medical and radiological devices. Some of the areas of coverage include laser and sunlamp standards inspections, compliance testing of various radiation-emitting products such as television receivers and microwave ovens, emergency response planning and policy, premarket approval and device manufacturers inspections, device problem reporting, sterilization of devices, and consumer education programs on medical and radiological devices.

  16. 78 FR 25291 - Announcement of Funding Awards; Section 3 Program Coordination and Implementation; Fiscal Year 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ... URBAN DEVELOPMENT Announcement of Funding Awards; Section 3 Program Coordination and Implementation... the Section 3 Program Coordination and Implementation for Fiscal Year (FY) 2010. This announcement... Coordination and Implementation Notice of Funding Availability (Section 3 NOFA) on June 7, 2011 announcing...

  17. 75 FR 75693 - Rehabilitation Mortgage Insurance Underwriting Program Section 203(k); Notice of Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-06

    ... URBAN DEVELOPMENT Rehabilitation Mortgage Insurance Underwriting Program Section 203(k); Notice of... information: Title of Proposal: Rehabilitation Mortgage Insurance Underwriting Program Section 203(k). OMB.... Specifically, under Section 203(k) of the Act, the Secretary is authorized to insure mortgages that fund...

  18. 30 CFR 250.1912 - What criteria for management of change must my SEMS program meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... SHELF Safety and Environmental Management Systems (SEMS) § 250.1912 What criteria for management of... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What criteria for management of change must my SEMS program meet? 250.1912 Section 250.1912 Mineral Resources BUREAU OF SAFETY AND...

  19. 30 CFR 250.1912 - What criteria for management of change must my SEMS program meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... SHELF Safety and Environmental Management Systems (SEMS) § 250.1912 What criteria for management of... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What criteria for management of change must my SEMS program meet? 250.1912 Section 250.1912 Mineral Resources BUREAU OF SAFETY AND...

  20. 30 CFR 250.1912 - What criteria for management of change must my SEMS program meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... SHELF Safety and Environmental Management Systems (SEMS) § 250.1912 What criteria for management of... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What criteria for management of change must my SEMS program meet? 250.1912 Section 250.1912 Mineral Resources BUREAU OF SAFETY AND...

  1. 2 CFR 215.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false Purpose of financial and program management. 215.20 Section 215.20 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS...

  2. 2 CFR 215.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Purpose of financial and program management. 215.20 Section 215.20 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved UNIFORM...

  3. 2 CFR 215.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false Purpose of financial and program management. 215.20 Section 215.20 Grants and Agreements Office of Management and Budget Guidance for Grants and Agreements OFFICE OF MANAGEMENT AND BUDGET CIRCULARS AND GUIDANCE Reserved UNIFORM...

  4. Review of Section XI inservice inspection program effectiveness

    SciTech Connect

    Cook, J.F. Sr.

    1993-08-01

    To evaluate the effectiveness of Section XI, Division 1, {open_quotes}Rules for Inservice Inspection of Nuclear Power Plant Components,{close_quotes} of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, searches were performed of the Licensing Event Report and Nuclear Plant Reliability Data System computerized data bases, and a review was made of inservice inspection summary reports. It was found that the Section XI examinations and tests detect flaws in welds and plant components and result in subsequent corrective action. This study also shows that the format and topics of information provided in Section XI-prescribed inservice inspection summary reports vary widely.

  5. 20 CFR 633.321 - Performance standards for section 402 programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Performance standards for section 402 programs. 633.321 Section 633.321 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR MIGRANT AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures §...

  6. FEMP (Federal Energy Management Program) Update, Spring 1989

    SciTech Connect

    Not Available

    1989-04-01

    The FEMP Update, published quarterly by the Federal Energy Management Program (FEMP), provides information that will assist federal managers in their energy management responsibilities. The Update is distributed primarily to federal facility and energy management personnel.

  7. Mississippi Curriculum Framework for Marketing Management Technology (Program CIP: 52.1401--Business Mkt. & Mkt. Mgmt.). Postsecondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for the course sequences in the state's marketing management technology program. Presented in the introduction are a program description and suggested course sequence. Section I lists baseline competencies for the…

  8. The Indiana Chronic Disease Management Program

    PubMed Central

    Rosenman, Marc B; Holmes, Ann M; Ackermann, Ronald T; Murray, Michael D; Doebbeling, Caroline Carney; Katz, Barry; Li, Jingjin; Zillich, Alan; Prescott, Victoria M; Downs, Stephen M; Inui, Thomas S

    2006-01-01

    The Indiana Chronic Disease Management Program (ICDMP) is intended to improve the quality and cost-effectiveness of care for Medicaid members with congestive heart failure (chronic heart failure), diabetes, asthma, and other conditions. The ICDMP is being assembled by Indiana Medicaid primarily from state and local resources and has seven components: (1) identification of eligible participants to create regional registries, (2) risk stratification of eligible participants, (3) nurse care management for high-risk participants, (4) telephonic intervention for all participants, (5) an Internet-based information system, (6) quality improvement collaboratives for primary care practices, and (7) program evaluation. The evaluation involves a randomized controlled trial in two inner-city group practices, as well as a statewide observational design. This article describes the ICDMP, highlights challenges, and discusses approaches to its evaluation. PMID:16529571

  9. Thin section casting program. Volume 3: Vertical TSC (Thin-Section Casting) approach

    NASA Astrophysics Data System (ADS)

    1989-01-01

    A prototype vertical twin belt caster was designed, constructed and tested at Bethlehem Steel Corporation's Homer Research Laboratory for the development of a thin section casting process. In the prototype caster, the moving mold was aligned vertically and each of the two endless steel belts was tensioned around an upper and a lower large pulley by means of a third smaller pulley. The mold consisted of a long parallel lower section and a shorter V-shaped top section into which liquid steel was fed from a tundish via a submerged refractory nozzle. Mold length, defined as the distance from the meniscus in the V-mouth to the tangent point of the lower pulleys, was about eleven feet. The length of the V-mouth was 27 in. The belts were continuously supported between the upper and lower pulleys by a unique back-up system. Downstream support consisted of two pairs of foot rolls and a vertical water-cooled steel structure that would permit a cast length of about nineteen feet. A chain driven bar was used to start a cast and support the slab. The aim was to cast 1 in. by 17 in. sections at 250 in./min. The details of the prototype vertical caster, except the end walls, are given.

  10. Coastal Zone Management program in Kerala, India

    SciTech Connect

    Mallik, T.K. )

    1987-01-01

    The physiographic setting of Kerala State, India, is unique. A narrow strip of the state contains a chain of lagoons and estuaries with a very high population density. The strip is subjected to severe coastal erosion during the monsoon season. A number of other problems are also associated with the coastal zone of Kerala, such as irregular dredging of black sands from the beaches, coastal flooding, hazards due to developmental activities, etc. A Coastal Zone Management Program was developed and administered by the Centre for Earth Science Studies, Trivandrum, to provide efficient coastal management and solve some of these problems. Various programs included under the Coastal Zone Management are the following: (1) Sedimentological, bathymetric, and geochemical studies of lagoons and estuaries; (2) monitoring of planimetric changes of beaches by profiling beaches during different seasons all along the coast; (3) studies of the nature, distribution, and provenance of black sand deposits from beaches; (4) studies of the peculiar occurrence of patchy, calm, turbid areas of water in the offshore containing high suspended sediment concentrate known as mud banks; (5) wave studies involving continuous monitoring of wave data all along the coast in order to understand wave climate and erosion; (6) sediment movement studies using fluorescent tracer to aid in the development of ports and harbors; (7) studies on various aspects of offshore. The outlines of the various programs discussed in this article will help other states and countries to develop a coastal zone management program according to the needs of the state or country and the nature of the problem occurring in the coastal zone.

  11. Supplement Analysis for the Transmission System Vegetation Management Program FEIS

    SciTech Connect

    N /A

    2001-04-01

    BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attachment. BPA is clearing the danger trees to prevent them from falling or growing into the lines causing outages. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (EIS) and Record of Decision (ROD). The planning step are described in the attached checklist. This Supplement Analysis finds that (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD, and; (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  12. 1998 Environmental Management Science Program Annual Report

    SciTech Connect

    1999-03-01

    The Environmental Management Science Program (EMSP) is a collaborative partnership between the DOE Office of Environmental Management (EM), Office of Science (DOE-SC), and the Idaho Operations Office (DOE-ID) to sponsor basic environmental and waste management related research. Results are expected to lead to reduction of the costs, schedule, and risks associated with cleaning up the nation's nuclear complex. The EMSP research portfolio addresses the most challenging technical problems of the EM program related to high level waste, spent nuclear fuel, mixed waste, nuclear materials, remedial action, decontamination and decommissioning, and health, ecology, or risk. The EMSP was established in response to a mandate from Congress in the fiscal year 1996 Energy and Water Development Appropriations Act. Congress directed the Department to ''provide sufficient attention and resources to longer-term basic science research which needs to be done to ultimately reduce cleanup costs, develop a program that takes advantage of laboratory and university expertise, and seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective''. This mandate followed similar recommendations from the Galvin Commission to the Secretary of Energy Advisory Board. The EMSP also responds to needs identified by National Academy of Sciences experts, regulators, citizen advisory groups, and other stakeholders.

  13. Urban energy management: a course on the administration of public energy programs. An instructor's guide

    SciTech Connect

    Mandelbaum, Dr., Len; Olsen, Dr., Marvin; Hyman, Dr., Barry; Sheridan, Mimi; Dahlberg, Judy; O'Brien, Jeremy

    1980-12-01

    The course provides local government administrators, staff, and students with the background knowledge to deal with a broad range of energy management concerns and is not to train technical energy conservation specialists. Section II contains the Instructor's Guide and Section III provides the Student Outlines and Handouts on the following subjects: The Energy Problem; National Energy Politics and Programs; State and Local Energy Programs; Techniques of Energy Planning; Techniques of Energy Conservation; Techniques of Renewable Energy Production; Strategies for Voluntary Energy Management; Strategies for Finan. Energy Management; and Strategies for Mandatory Energy Management. (MCW)

  14. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  15. An integrated scheduling and program management system

    NASA Astrophysics Data System (ADS)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  16. Thin section casting program: Volume 3, Vertical TSC (thin-section casting) approach: Final report

    SciTech Connect

    Not Available

    1989-01-01

    A prototype vertical twin belt caster was designed, constructed and tested at Bethlehem Steel Corporation's Homer Research Laboratory for the development of a thin section casting process. In the prototype caster the moving mold was aligned vertically and each of the two endless steel belts was tensioned around an upper and a lower large pulley by means of a third smaller pulley. The mold consisted of a long parallel lower section and a shorter V-shaped top section into which liquid steel was fed from a tundish via a submerged refractory nozzle. Mold length, defined as the distance from the meniscus in the V-mouth to the tangent point of the lower pulleys, was about eleven feet. The length of the V-mouth was 27 in. The belts were continuously supported between the upper and lower pulleys by a unique back-up system. Downstream support consisted of two pairs of foot rolls and a vertical water-cooled steel structure that would permit a cast length of about nineteen feet. A chain driven bar was used to start a cast and support the slab. The aim was to cast 1 in. /times/ 17 in. sections at 250 in./min. The details of the prototype vertical caster, except the end walls, are given. The water modeling studies conducted at USSteel to establish tundish nozzle port sizes, inclinations and depth of submergence below the meniscus for optimum flow pattern in the V-mouth are included. The design analyses of the copper end walls and the 10-ton liquid steel trials conducted with the refractory end walls are presented. The fourteen liquid steel trials conducted with the vertical caster and the concluding remarks on vertical feeding system development are discussed.

  17. University Program Management Information System: NASA's University Program Active Projects

    NASA Technical Reports Server (NTRS)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  18. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  19. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    1999-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. (See the bar chart on the next page). This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.

  20. Thin section casting program. Volume 1: Executive summary and overview

    NASA Astrophysics Data System (ADS)

    1989-01-01

    The objective of this project which started in September 1984 was to develop a new casting technology which could be both applied to the total range of hot- and cold-rolled sheet steels, and be successfully developed within a five-year project time scale. These requirements resulted in the choice of a thin section casting (TSC) approach (casting around 1-inch-thick) over the alternative strip casting approach (casting around 0.1-inch-thick). The TSC approach was expected to result in significant capital cost, operating cost, and energy savings over current 10-inch-thick slab casting technology.

  1. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    2000-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA:s objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA:s Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data.* This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  2. NASA University Program Management Information System

    NASA Technical Reports Server (NTRS)

    Gans, Gary

    1997-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well-being. NASA field codes and certain Headquarters program offices provide funds for those activities in universities which contribute to the mission needs of that particular NASA element. Although NASA has no predetermined amount of money to devote to university activities, the effort funded each year is substantial. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Education Division/FE, Office of Human Resources and Education, using a management information system which was modernized during FY 1993.

  3. IFLA General Conference, 1991. Division of Management and Technology: Section of Conservation; Section of Information Technology; Section of Library Buildings and Equipment; Section of Statistics; Management of Library Associations. Booklet 6.

    ERIC Educational Resources Information Center

    International Federation of Library Associations and Institutions, The Hague (Netherlands).

    The eight papers in this collection were presented at five sections of the Division of Management and Technology: (1) "The State Conservation Programme (Concept Approach)" (Tamara Burtseva and Zinaida Dvoriashina, USSR); (2) "La communication a distance de banques d'images pour le grand public (Public Access to Image Databases via…

  4. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  5. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  6. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  7. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  8. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  9. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  10. 49 CFR 237.33 - Content of bridge management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Content of bridge management programs. 237.33... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.33 Content of bridge management programs. Each bridge management program adopted in compliance with this...

  11. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  12. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  13. 49 CFR 237.31 - Adoption of bridge management programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Adoption of bridge management programs. 237.31... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Railroad Bridge Safety Assurance § 237.31 Adoption of bridge management programs. Each track owner shall adopt a bridge safety management program...

  14. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  15. An Analysis of the Radio Program Manager Occupation.

    ERIC Educational Resources Information Center

    Friedberg, Jerry; Stella, Phillip.

    This occupational analysis data was assembled to help broadcasting arts teachers develop a course of study in program management for junior and senior high school students. Following a job description for a program manager, the remainder of the content in standard task analysis format presents an analysis of nine program management duties (tasks).…

  16. 77 FR 12905 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Program Management Committee. DATES: The meeting will be held March 21, 2012, from 8:30 a.m.-1:30...

  17. 20 CFR 633.102 - Scope and purpose of title IV, section 402 programs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Scope and purpose of title IV, section 402 programs. 633.102 Section 633.102 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR MIGRANT AND SEASONAL FARMWORKER PROGRAMS Introductory Provisions § 633.102 Scope and purpose...

  18. A generic hazardous waste management training program

    SciTech Connect

    Carter, R.J.; Karnofsky, B.

    1988-01-01

    The main purpose of this training program element is to familiarize personnel involved in hazardous waste management with the goals of RCRA and how they are to be achieved. These goals include: to protect health and the environment; to conserve valuable material and energy resources; to prohibit future open dumping on the land; to assure that hazardous waste management practices are conducted in a manner which protects human health and the environment; to insure that hazardous waste is properly managed thereby reducing the need for corrective actions in the future; to establish a national policy to reduce or eliminate the generation of hazardous waste, wherever feasible. Another objective of this progam element is to present a brief overview of the RCRA regulations and how they are implemented/enforced by the Environmental Protection Agency (EPA) and each of the fifty states. This element also discusses where the RCRA regulations are published and how they are updated. In addition it details who is responsible for compliance with the regulations. Finally, this part of the training program provides an overview of the activities and materials that are regulated. 1 ref.

  19. 41 CFR 102-194.30 - What role does my agency play in the Standard and Optional Forms Management Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... What role does my agency play in the Standard and Optional Forms Management Program? Your agency head... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What role does my agency play in the Standard and Optional Forms Management Program? 102-194.30 Section 102-194.30...

  20. Issues in NASA program and project management. Special Report: 1993 conference

    NASA Technical Reports Server (NTRS)

    Hoffman, ED (Editor); Kishiyama, Jenny S. (Editor)

    1993-01-01

    This volume is the seventh in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1993 Conference: perspectives in NASA program/project management; the best job in aerospace; improvements in project management at NASA; strategic planning...mapping the way to NASA's future; new NASA procurement initiatives; international cooperation; and industry, government and university partnership. A section on resources for NASA managers rounds out the publication.

  1. 76 FR 57022 - Coastal Zone Management Program: Illinois

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Oceanic And Atmospheric Administration Coastal Zone Management Program: Illinois AGENCY: Office of Ocean and Coastal Resource Management (OCRM), National Oceanic and Atmospheric Administration (NOAA... Impact Statement (DEIS) prepared by NOAA's Office of Ocean and Coastal Resource Management. The...

  2. IFLA General Conference, 1989. Division of Management and Technology. Section on Conservation; Section on Information Technology; Section on Library Buildings and Equipment; Section on Statistics; Round Table on Audiovisual Media; Round Table for the Management of Library Associations. Booklet 60.

    ERIC Educational Resources Information Center

    International Federation of Library Associations, The Hague (Netherlands).

    There are 15 papers in this collection from the Division of Management and Technology: (1) "Les Activites de formation dans les centres regionaux du Programme PAC" (Training Activities in the Regional Centers of the Preservation and Conservation Program) (Jean-Marie Arnoult); (2) "Professional Education for Preservation: An Overview" (John…

  3. Heavy-Section Steel Technology Program Semiannual progress report, April--September 1993. Volume 10, No. 2

    SciTech Connect

    Pennell, W.E.

    1995-05-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the Nuclear Regulatory Commission by Oak Ridge National Laboratory (ORNL). The program focuses on the development and validation of technology for the assessment of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in 12 tasks: Program management, fracture methodology and analysis, material characterizations and properties, special technical assistance, fracture analysis computer programs, cleavage-crack initiation, cladding evaluations, pressurized-thermal-shock technology, analysis methods validation, fracture evaluation tests, warm prestressing, and biaxial loading effects on fracture toughness. The program tasks have been structured to emphasize the resolution fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel Irradiation Program at ORNL and with related research programs both in the United States and abroad. This report provide s an overview of principal developments in each of the 12 program tasks from April -- September 1993.

  4. Heavy-Section Steel Technology Program. Semiannual progress report, October 1991--March 1992: Volume 9, No. 1

    SciTech Connect

    Pennell, W E

    1992-11-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the Nuclear Regulatory Commission (NRC) by Oak Ridge National Laboratory (ORNL). The program focus is on the development and validation of technology for the assessment of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in 11 tasks: program management, fracture methodology and analysis, material characterization and properties, special technical assistance, fracture analysis computer programs, cleavage-crack initiation, cladding evaluations, pressurized-thermal-shock technology, analysis methods validation, fracture evaluation tests, and warm prestressing. The program tasks have been structured to place emphasis on the resolution fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel Irradiation (HSSI) Program at ORNL and with related research programs both in the United States and abroad. This report provides an overview of principal developments in each of the II program tasks from October 1, 1991 to March 31, 1992.

  5. The role of the case manager in a disease management program.

    PubMed

    Huston, Carol J

    2002-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  6. The role of the case manager in a disease management program.

    PubMed

    Huston, C J

    2001-01-01

    Disease management programs provide new opportunities and roles for case managers to provide population-based healthcare to the chronically ill. This article identifies common components of disease management programs and examines roles assumed by case managers in disease management programs such as baseline assessment, performing economic analyses of diseases and their respective associated resource utilization, developing and/or implementing care guidelines or algorithms, educational interventions, disease management program implementation, and outcomes assessment. Areas of expertise needed to be an effective case manager in a disease management program are also identified.

  7. Heavy-Section Steel Irradiation Program. Volume 5, No. 2, Progress report, April 1994--September 1994.

    SciTech Connect

    Corwin, W.R.

    1995-07-01

    The Heavy-Section Steel Irradiation (HSSI) Program has been established with its primary goal to provide a thorough, quantitative assessment of the effects of neutron irradiation on the material behavior and the fracture toughness properties of typical pressure-vessel steels as they relate to light-water RPV integrity. Effects of specimen size; material chemistry; product form and microstructure; irradiation fluence, flux, temperature, and spectrum; and postirradiation annealing are being examined on a wide range of fracture properties. The HSSI Program is arranged into 14 tasks: (1) program management, (2) fracture toughness curve shift in high-copper weldments (Series 5 and 6), (3) K{sub lc} and K{sub la} curve shifts in low upper-shelf (LUS) welds (Series 8), (4) irradiation effects in a commercial LUS weld (Series 10), (5) irradiation effects on weld heat-affected zone and plate materials (Series 11), (6) annealing effects in LUS welds (Series 9), (7) microstructural and microfracture analysis of irradiation effects, (8) in-service irradiated and aged material evaluations, (9) Japan Power Development Reactor (JPDR) steel examination, (10) fracture toughness curve shift method, (11) special technical assistance, (12) technical assistance for Joint Coordinating Committee on Civilian Nuclear Reactor Safety (JCCCNRS) Working Groups 3 and 12, (13) correlation monitor materials, and (14) test reactor coordination. Progress on each task is reported.

  8. The watershed and river systems management program

    USGS Publications Warehouse

    Markstrom, S.L.; Frevert, D.; Leavesley, G.H.; ,

    2005-01-01

    The Watershed and River System Management Program (WaRSMP), a joint effort between the U.S. Geological Survey (USGS) and the U.S. Bureau of Reclamation (Reclamation), is focused on research and development of decision support systems and their application to achieve an equitable balance among diverse water resource management demands. Considerations include: (1) legal and political constraints; (2) stake holder and consensus-building; (3) sound technical knowledge; (4) flood control, consumptive use, and hydropower; (5) water transfers; (6) irrigation return flows and water quality; (7) recreation; (8) habitat for endangered species; (9) water supply and proration; (10) near-surface groundwater; and (11) water ownership, accounting, and rights. To address the interdisciplinary and multi-stake holder needs of real-time watershed management, WaRSMP has developed a decision support system toolbox. The USGS Object User Interface facilitates the coupling of Reclamation's RiverWare reservoir operations model with the USGS Modular Modeling and Precipitation Runoff Modeling Systems through a central database. This integration is accomplished through the use of Model and Data Management Interfaces. WaRSMP applications include Colorado River Main stem and Gunnison Basin, the Yakima Basin, the Middle Rio Grande Basin, the Truckee-Carson Basin, and the Umatilla Basin.

  9. Program Helps Generate And Manage Graphics

    NASA Technical Reports Server (NTRS)

    Truong, L. V.

    1994-01-01

    Living Color Frame Maker (LCFM) computer program generates computer-graphics frames. Graphical frames saved as text files, in readable and disclosed format, easily retrieved and manipulated by user programs for wide range of real-time visual information applications. LCFM implemented in frame-based expert system for visual aids in management of systems. Monitoring, diagnosis, and/or control, diagrams of circuits or systems brought to "life" by use of designated video colors and intensities to symbolize status of hardware components (via real-time feedback from sensors). Status of systems can be displayed. Written in C++ using Borland C++ 2.0 compiler for IBM PC-series computers and compatible computers running MS-DOS.

  10. Mixed Waste Focus Area program management plan

    SciTech Connect

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  11. The Oak Ridge Refrigerant Management Program

    NASA Technical Reports Server (NTRS)

    Kevil, Thomas H.

    1995-01-01

    For many years, chlorofluorocarbons (CFC's) have been used by the Department of Energy's (DOE) Oak Ridge Y-12 Plant in air conditioning and process refrigeration systems. However, Title 6 of the Clean Air Act Amendments (CAAA) and Executive Order 12843 (Procurement Requirements and Policies for Federal Agencies for Ozone Depleting Substances) signed by President Clinton require, as policy, that all federal agencies maximize their use of safe, alternate refrigerants and minimize, where economically practical, the use of Class 1 refrigerants. Unfortunately, many government facilities and industrial plants have no plan or strategy in place to make this changeover, even though their air conditioning and process refrigeration equipment may not be sustainable after CFC production ends December 31, 1995. The Y-12 Plant in Oak Ridge, Tennessee, has taken an aggressive approach to complying with the CAAA and is working with private industry and other government agencies to solve tough manufacturing and application problems associated with CFC and hydrochlorofluorocarbon (HCFC) alternatives. Y-12 was the first DOE Defense Program (DP) facility to develop a long-range Stratospheric Ozone Protection Plan for refrigerant management for compliance with the CAAA. It was also the first DOE DP facility to complete detailed engineering studies on retrofitting and replacing all air conditioning and process refrigeration equipment to enable operation with alternate refrigerants. The management plan and engineering studies are models for use by other government agencies, manufacturing plants, and private industry. This presentation identifies some of the hidden pitfalls to be encountered in the accelerated phaseout schedule of CFC's and explains how to overcome and prevent these problems. In addition, it outlines the general issues that must be considered when addressing the phase-out of ozone depleting substances and gives some 'lessons learned' by Y-12 from its Refrigerant Management

  12. Florida Department of Corrections' Distance Learning Program. Florida Corrections Commission 1999 Annual Report, Section 7.

    ERIC Educational Resources Information Center

    Florida State Corrections Commission, Tallahassee.

    The Florida Department of Corrections Distance Learning Program consists of the Corrections Distance Learning Network; offender programming; staff development; and the Agency Strategic Plan. The Corrections Distance Learning Network offers academic, vocational training, and life management skills programs for offenders and staff development and…

  13. Heavy-section steel technology program: Semiannual progress report, October 1993--March 1994. Volume 11, No. 1

    SciTech Connect

    Pennell, W.E.

    1995-11-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the US Nuclear Regulatory Commission (NRC) by Oak Ridge National Laboratory (ORNL). The Program focus is on the development and validation of technology for the assessment Of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in seven tasks: (1) program management (2) constraint effects analytical development and validation, (3) evaluation of cladding effects, (4) ductile to cleavage fracture mode conversion, (5) fracture analysis methods development and applications, (6) material Property data and test methods, and (7) integration of results into a state-of-the-art methodology. The program tasks have been structured to place emphasis on the resolution fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel Irradiation Program at ORNL and with related research programs both in the United States and abroad. This report provides an overview of principal developments in each of the seven program tasks from October 1993--March 1994.

  14. Heavy-section steel technology program: Semiannual progress report for April--September 1996. Volume 13, Number 2

    SciTech Connect

    Pennell, W.E.

    1998-03-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the US Nuclear Regulatory Commission (NRC) by the Oak Ridge National Laboratory (ORNL). The program focus is on the development and validation of technology for the assessment of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in seven tasks: (1) program management, (2) constraint effects analytical development and validation, (3) evaluation of cladding effects, (4) ductile to cleavage fracture mode conversion, (5) fracture analysis methods development and applications, (6) material property data and test methods, and (7) integration of results into a state-of-the-art methodology. The program tasks have been structured to place emphasis on the resolution fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel irradiation Program at ORNL and with related research programs both in the US and abroad. This report provides an overview of principal developments in each of the seven program tasks from April 1996--September 1996.

  15. Heavy-Section Steel Technology Program: Semiannual progress report for April--September 1994. Volume 11, Number 2

    SciTech Connect

    Pennell, W.E.

    1996-04-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the Nuclear Regulatory Commission (NRC) by Oak Ridge National Laboratory (ORNL). The program focus is on the development and validation of technology for the assessment of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in seven tasks: (1) program management, (2) constraint effects analytical development and validation, (3) evaluation of cladding effects, (4) ductile-to-cleavage fracture-mode conversion, (5) fracture analysis methods development and applications, (6) material property data and test methods, and (7) integration of results. The program tasks have been structured to place emphasis on the resolution fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel Irradiation (HSSI) Program at ORNL and with related research programs both in the US and abroad. This report provides an overview of principal developments in each of the seven program tasks from April 1994 to September 1994.

  16. Heavy-section steel technology program. Semiannual progress report, April--September 1995 Vol. 12, No. 2

    SciTech Connect

    Pennell, W.E.

    1997-01-01

    The Heavy-Section Steel Technology (HSST) Program is conducted for the Nuclear Regulatory Commission by Oak Ridge National Laboratory (ORNL). The program focus is on the development and validation of technology for the assessment of fracture-prevention margins in commercial nuclear reactor pressure vessels. The HSST Program is organized in seven tasks: (1) program management, (2) constraint effects analytical development and validation, (3) evaluation of cladding effects, (4) ductile-to-cleavage fracture-mode conversion, (5) fracture analysis methods development and applications, (6) material property data and test methods, and (7) integration of results. The program tasks have been structured to place emphasis on the resolution of fracture issues with near-term licensing significance. Resources to execute the research tasks are drawn from ORNL with subcontract support from universities and other research laboratories. Close contact is maintained with the sister Heavy-Section Steel Irradiation Program at ORNL and with related research programs both in the United States and abroad. This report provides an overview of principal developments in each of the seven program tasks from April 1995 to September 1995.

  17. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the...

  18. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the...

  19. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the...

  20. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the...

  1. 43 CFR 12.920 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Organizations Post-Award Requirements § 12.920 Purpose of financial and program management. Sections 12.921 through 12.928 prescribe standards for financial management systems, methods for making payments and rules... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Purpose of financial and...

  2. 30 CFR 250.1909 - What are management's general responsibilities for the SEMS program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OUTER CONTINENTAL SHELF Safety and Environmental Management Systems (SEMS) § 250.1909 What are... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What are management's general responsibilities for the SEMS program? 250.1909 Section 250.1909 Mineral Resources BUREAU OF OCEAN ENERGY...

  3. 30 CFR 250.1912 - What criteria for management of change must my SEMS program meet?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OUTER CONTINENTAL SHELF Safety and Environmental Management Systems (SEMS) § 250.1912 What criteria for... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What criteria for management of change must my SEMS program meet? 250.1912 Section 250.1912 Mineral Resources BUREAU OF OCEAN ENERGY...

  4. Purchasing and Accounting. MAS-116. Waste Isolation Division (WID). Management and Supervisor Training (MAST) Program.

    ERIC Educational Resources Information Center

    Westinghouse Electric Corp., Carlsbad, NM.

    This learning module, which is part of a management and supervisor training program for managers and supervisors employed at the Department of Energy's Waste Isolation Division, is designed to prepare trainees to perform purchasing and accounting tasks efficiently and effectively. The first section is an introduction to the module. The next three…

  5. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the...

  6. 15 CFR 14.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management. 14.20 Section 14.20 Commerce and Foreign Trade Office of the Secretary of Commerce UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management §...

  7. 77 FR 15343 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... AGENCY 40 CFR Part 271 Oklahoma: Final Authorization of State Hazardous Waste Management Program... Oklahoma has applied to EPA for Final authorization of the changes to its hazardous waste program under the... Oklahoma. In the ``Rules and Regulations'' section of this Federal Register, EPA is authorizing the...

  8. 40 CFR 30.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Purpose of financial and program management. 30.20 Section 30.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... cost sharing and matching requirements, accounting for program income, budget revision...

  9. 40 CFR 30.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Purpose of financial and program management. 30.20 Section 30.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... cost sharing and matching requirements, accounting for program income, budget revision...

  10. 34 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false Purpose of financial and program management. 74.20 Section 74.20 Education Office of the Secretary, Department of Education ADMINISTRATION OF GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program...

  11. Keeping the dream alive: Managing the Space Station Program, 1982 to 1986

    NASA Technical Reports Server (NTRS)

    Lewin, Thomas J.; Narayanan, V. K.

    1990-01-01

    The management is described and analyzed of the formative years of the NASA Space Station Program (1982 to 1986), beginning with the successful initiative for program approval by Administrator James M. Beggs through to the decision to bring program management to Reston, Virginia. Emphasis is on internal management issues related to the implementation of the various phases of the program. Themes examined are the problem of bringing programmatic and institutional interests together and focusing them to forward the program; centralized versus decentralized control of the program; how the history of NASA and of the individual installations affected the decisions made; and the pressure from those outside NASA. The four sections are: (1) the decision to build the space station, (2) the design of the management experiment, (3) the experiment comes to life, and (4) the decision reversal.

  12. Diabetes disease management in Medicaid managed care: a program evaluation.

    PubMed

    Patric, Kenneth; Stickles, Joyce D; Turpin, Robin S; Simmons, Jeffrey B; Jackson, James; Bridges, Elizabeth; Shah, Manan

    2006-06-01

    The objective of this study was to evaluate the outcomes of a diabetes disease management initiative among TennCare's Medicaid Population. A quasi-experimental group design was conducted using a control group and a diabetes disease management intervention group. Primary outcomes measures were rates for three key recommended tests (ie, microalbuminuria, lipids, and hemoglobin A1c). Secondary performance measures --patient satisfaction and program evaluation issues -- also were assessed. The study was performed among TennCare beneficiaries with diabetes mellitus. It utilized a quasi-experimental nonequivalent control group design, with 993 intervention participants in Knoxville and 1167 control group members in Chattanooga. Variables analyzed included testing rates for hemoglobin A1c, lipids, microalbuminuria, and demographics. A logistic regression model using baseline covariates was constructed to analyze the differences between the intervention and the control groups. Intracluster correlations were accounted for by generalized estimating equations. Statistical process control detected process changes in testing rates over time. There were meaningful changes in the rate of ordering recommended tests. The odds of an individual in the intervention group having at least one microalbuminuria test were 196% more (confidence interval [CI] = 1.50, 5.82; p = 0.002); the odds of having at least one lipid profile were 43% more (CI = 1.01, 2.02; p = 0.042); and the odds of having two or more hemoglobin A1c tests were 39% more (CI = 0.87, 2.23; p = 0.165) than the odds of an individual in the control group. The analysis also showed a high rate of satisfaction among patients in the intervention group. The program was successful in meeting its stated goals of providing effective disease management for TennCare patients with diabetes.

  13. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  14. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  15. Development and Implementation of a Program Management Maturity Model

    SciTech Connect

    Hartwig, Laura; Smith, Matt

    2008-12-15

    In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

  16. Greenhouse Gas Management Program Overview (Fact Sheet)

    SciTech Connect

    Not Available

    2011-11-01

    Program fact sheet highlighting federal requirements for GHG emissions management, FEMP services to help agencies reduce emissions, and additional resources. The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) assists Federal agencies with managing their greenhouse gas (GHG) emissions. GHG management entails measuring emissions and understanding their sources, setting a goal for reducing emissions, developing a plan to meet this goal, and implementing the plan to achieve reductions in emissions. FEMP provides the following services to help Federal agencies meet the requirements of inventorying and reducing their GHG emissions: (1) FEMP offers one-on-one technical assistance to help agencies understand and implement the Federal Greenhouse Gas Accounting and Reporting Guidance and fulfill their inventory reporting requirements. (2) FEMP provides training, tools, and resources on FedCenter to help agencies complete their annual inventories. (3) FEMP serves a leadership role in the interagency Federal Working Group on Greenhouse Gas Accounting and Reporting that develops recommendations to the Council on Environmental Quality (CEQ) for the Federal Greenhouse Gas Accounting and Reporting Guidance. (4) As the focus continues to shift from measuring emissions (completing inventories) to mitigating emissions (achieving reductions), FEMP is developing a strategic planning framework and resources for agencies to prioritize among a variety of options for mitigating their GHG emissions, so that they achieve their reduction goals in the most cost-effective manner. These resources will help agencies analyze their high-quality inventories to make strategic decisions about where to use limited resources to have the greatest impact on reducing emissions. Greenhouse gases trap heat in the lower atmosphere, warming the earth's surface temperature in a natural process known as the 'greenhouse effect.' GHGs include carbon dioxide (CO{sub 2}), methane (CH{sub 4

  17. 78 FR 14151 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held March 20, 2013, from 8:30 a.m.-1:30 p.m. ADDRESSES:...

  18. 78 FR 57673 - RTCA Program Management Committee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... Federal Aviation Administration RTCA Program Management Committee; Meeting AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held October 8, 2013 from 8:30 a.m.-1:30 a.m. ADDRESSES:...

  19. 78 FR 43962 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held August 12, from 10:00 a.m.-2:00 p.m. ADDRESSES:...

  20. 78 FR 72747 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... Federal Aviation Administration Meeting: RTCA Program Management Committee AGENCY: Federal Aviation Administration (FAA), U.S. Department of Transportation (DOT). ACTION: Notice of RTCA Program Management... Management Committee. DATES: The meeting will be held December 18, from 8:30 a.m.-5:00 p.m. ADDRESSES:...

  1. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    ERIC Educational Resources Information Center

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  2. Integration of Risk Management Techniques into Outdoor Adventure Program Design.

    ERIC Educational Resources Information Center

    Bruner, Eric V.

    This paper is designed to acquaint the outdoor professional with the risk management decision making process required for the operation and management of outdoor adventure activities. The document examines the programming implications of fear in adventure activities; the risk management process in adventure programming; a definition of an…

  3. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  4. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  5. 33 CFR 385.25 - Program Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN CERP Implementation... agencies, develop a Program Management Plan prior to initiating a program-level activity. (2) The Program Management Plan shall define the activities, and where appropriate, the subordinate tasks, as well as...

  6. Small Business Microcomputer Programs: Tools for Library Media Center Management.

    ERIC Educational Resources Information Center

    Yerkey, A. Neil

    1984-01-01

    This examination of ways to use general-purpose commercial software to assist in the management of library media centers focuses on database management programs, word processing, authoring systems, and calculator (spreadsheet) programs. System requirements and purchasing information for representative programs (address, price) are provided. Six…

  7. Residue Management: A Computer Program About Conservation Tillage Decisions.

    ERIC Educational Resources Information Center

    Thien, Steve J.

    1986-01-01

    Describes a computer program, Residue Management, which is designed to supplement discussions on the Universal Soil Loss Equation and the impact of tillage on soil properties for introductory soil courses. The program advances the user through three stages of residue management. Information on obtaining the program is also included. (ML)

  8. SNL/CA Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2005-09-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program was developed in accordance with Department of Energy (DOE) Order 450.1 and incorporates the elements of the International Standard on Environmental Management Systems, ISO 14001.

  9. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  10. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  11. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  12. 76 FR 16800 - Notice of Submission of Proposed Information Collection: Section 5(h) Homeownership Program for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... in the Public and Indian Housing Information Center (PIC). The sections in the regulation that impose... Center (PIC). Statutory mandates and Federal program requirements would not be met if the collection...

  13. COMBUSTION TURBINE (CT) HOT SECTION COATING LIFE MANAGEMENT

    SciTech Connect

    R. Viswanathan; K. Krzywosz; S. Cheruvu; E. Wan

    2003-04-01

    The integrity of coatings used in hot section components of combustion turbines is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non destructively; correspondingly, three principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3, with the objective of developing mechanism based algorithms. Task 4 would be aimed at verifying analytical predictions from Task 1 and the NDE predictions from Task 3 against field observations. Task 5 would develop a risk-based decision analysis model to make run/repair decisions. This report is a record of the progress to date on these 3 tasks.

  14. Combustion Turbine (CT) Hot Section Coating Life Management

    SciTech Connect

    R. Viswanathan; D. Gandy; K. Krzywosz; S. Cheruvu; E. Wan

    2003-09-30

    The integrity of coatings used in hot section components of combustion turbines is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non-destructively; correspondingly, three principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3 with the objective of developing mechanism based algorithms. Task 4 would be aimed at verifying analytical predictions from Task 1 and the NDE predictions from Task 3 against field observations. Task 5 would develop a risk-based decision analysis model to make run/repair decisions. This report is a record of the progress to date on these four tasks.

  15. Combustion Turbine (CT) Hot Section Coating Life Management

    SciTech Connect

    R. Viswanathan; D. Gandy; K. Krzywosz; S. Cheruvu; E. Wan

    2004-03-31

    The integrity of coatings used in hot section components of combustion turbines is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non-destructively; correspondingly, three principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3 with the objective of developing mechanism based algorithms. Task 4 would be aimed at verifying analytical predictions from Task 1 and the NDE predictions from Task 3 against field observations. Task 5 would develop a risk-based decision analysis model to make run/repair decisions. This report is a record of the progress to date on these four tasks.

  16. Combustion Turbine (CT) Hot Section Coating Life Management

    SciTech Connect

    S. Cheruvu; K. Krzywosz

    2005-03-31

    The integrity of coatings used in hot section components of combustion turbines is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non-destructively; correspondingly, four principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3 with the objective of developing mechanism based algorithms. Task 4 is aimed at verifying analytical predictions from Task 1 and the NDE predictions from Task 3 against field observations.

  17. COMBUSTION TURBINE (CT) HOT SECTION COATING LIFE MANAGEMENT

    SciTech Connect

    D. Gandy; R. Viswanathan; S. Cheruvu; K. Krzywosz

    2006-03-31

    The integrity of coatings used in hot section components of combustion turbines is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non-destructively; correspondingly, four principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3 with the objective of developing mechanism based algorithms. Task 4 is aimed at verifying analytical predictions from Task 1 and the NDE predictions from Task 3 against field observations.

  18. COMBUSTION TURBINE (CT) HOT SECTION COATING LIFE MANAGEMENT

    SciTech Connect

    R. Viswanathan; D. Gandy; K. Krzywosz; S. Cheruvu; E. Wan

    2002-12-02

    The integrity of coatings used in hot section components of combustion turbine is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non destructively; correspondingly, three principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3, with the objective of developing mechanism based algorithms. This report is a record of the progress to date on these 3 key tasks. Two supporting tasks relating to field validation (Task 4) and economic analysis (Task 5) have not yet been initiated.

  19. COMBUSTION TURBINE (CT) HOT SECTION COATING LIFE MANAGEMENT

    SciTech Connect

    R. Viswanathan; K. Krzywosz; S. Cheruvu; E. Wan

    2002-08-09

    The integrity of coatings used in hot section components of combustion turbine is crucial to the reliability of the buckets. This project was initiated in recognition of the need for predicting the life of coatings analytically, and non destructively; correspondingly, three principal tasks were established. Task 1, with the objective of analytically developing stress, strain and temperature distributions in the bucket and thereby predicting thermal fatigue (TMF) damage for various operating conditions; Task 2 with the objective of developing eddy current techniques to measure both TMF damage and general degradation of coatings and, Task 3, with the objective of developing mechanism based algorithms. This report is a record of the progress to date on these 3 key tasks. Two supporting tasks relating to field validation (Task 4) and economic analysis (Task 5) have not yet been initiated.

  20. 24 CFR 235.1220 - Processing section 235(r) mortgages under the direct endorsement program.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... must meet for the direct endorsement program are contained in 24 CFR 203.5 and 203.255. Under those... processing. There are several provisions of 24 CFR 203.5 and 203.255 which do not apply to section 235(r... in paragraph (a) of this section, the provisions contained in 24 CFR 203.5 and 203.255 apply...

  1. 24 CFR 235.1220 - Processing section 235(r) mortgages under the direct endorsement program.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... must meet for the direct endorsement program are contained in 24 CFR 203.5 and 203.255. Under those... processing. There are several provisions of 24 CFR 203.5 and 203.255 which do not apply to section 235(r... in paragraph (a) of this section, the provisions contained in 24 CFR 203.5 and 203.255 apply...

  2. 24 CFR 235.1220 - Processing section 235(r) mortgages under the direct endorsement program.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... must meet for the direct endorsement program are contained in 24 CFR 203.5 and 203.255. Under those... processing. There are several provisions of 24 CFR 203.5 and 203.255 which do not apply to section 235(r... in paragraph (a) of this section, the provisions contained in 24 CFR 203.5 and 203.255 apply...

  3. 75 FR 5847 - Section 5309 Bus and Bus Facilities Livability Initiative and Urban Circulator Program Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... Federal Transit Administration Section 5309 Bus and Bus Facilities Livability Initiative and Urban... Application Deadline for the Bus and Bus Facilities and Urban Circulator Livability Initiative Programs... discretionary Section 5309 Bus and Bus Facilities grant and New Starts funds in support of the Department...

  4. 24 CFR 235.1220 - Processing section 235(r) mortgages under the direct endorsement program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Processing section 235(r) mortgages under the direct endorsement program. 235.1220 Section 235.1220 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR...

  5. 75 FR 56946 - Medicaid Program; Review and Approval Process for Section 1115 Demonstrations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... approved under section 1115 of the Social Security Act relating to Medicaid and the Children's Health... Protection and Affordable Care Act of 2010 (Pub. L. 111-148) CHIP--The Children's Health Insurance Program... Medical Assistance Programs of the Social Security Act. Title XXI--State Children's Health...

  6. Impacts of Four Title V, Section 510 Abstinence Education Programs. Final Report

    ERIC Educational Resources Information Center

    Trenholm, Christopher; Devaney, Barbara; Fortson, Ken; Quay, Ken; Wheeler, Justin; Clark, Melissa

    2007-01-01

    Since fiscal year 1998, the Title V, Section 510 program has allocated $50 million annually in federal funding for programs that teach abstinence form sexual activity outside of marriage as the expected standard for school-age children. A new impact report from Mathematica's congressionally mandated multi-year evaluation of four abstinence…

  7. Systems approach provides management control of complex programs

    NASA Technical Reports Server (NTRS)

    Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.

    1970-01-01

    Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

  8. PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PHOTOCOPY OF DRAWING (from Cultural Resources Management Program for the Environment Management Division, Directorate of Public Works, Fort Benning, Georgia) Delineator unknown. GARAGES - Fort Benning, Building No. 864, 7325 Miller Loop, Main Post, Fort Benning Military Reservation, Chattahoochee County, GA

  9. Lessons Learned from the Everglades Collaborative Adaptive Management Program

    EPA Science Inventory

    Recent technical papers explore whether adaptive management (AM) is useful for environmental management and restoration efforts and discuss the many challenges to overcome for successful implementation, especially for large-scale restoration programs (McLain and Lee 1996; Levine ...

  10. Learning to Manage: A Program Just for Directors.

    ERIC Educational Resources Information Center

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  11. Successful Management of Public School Capital Improvement Programs.

    ERIC Educational Resources Information Center

    Filardo, Mary

    2000-01-01

    In 1999, the 21st Century School Fund interviewed seven large school districts regarding management of capital-improvement programs. Researchers found three basic models: in-house management, other-public-agency management, and private-sector management. Systematic oversight and quality-control approaches will protect school systems from…

  12. FDA (food and drug administration) compliance program guidance manual (fy 84). Section 6. Radiological health

    SciTech Connect

    Not Available

    1983-10-01

    The FDA Compliance Program Guidance Manual provides a system for issuing and filing written program plans and instructions directed to Food and Drug Administration Field operations for project implementation. Section VI provides those chapters of the Compliance Program Guidance Manual which pertain to the area of radiological health. Some of the areas of coverage include laser standards; compliance testing of x-ray equipment, ultrasonic therapy devices, mercury vapor lamps, television receivers, and microwave ovens; radiation policy; and imported electronic products.

  13. SNL/CA Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2007-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004. Elements of the ISO standard overlap with those of Department of Energy (DOE) Order 450.1, thus SNL/CA's EMS program also meets the DOE requirements.

  14. Managing anesthesia for cesarean section in obese patients: current perspectives.

    PubMed

    Lamon, Agnes M; Habib, Ashraf S

    2016-01-01

    Obesity is a worldwide epidemic. It is associated with increased comorbidities and increased maternal, fetal, and neonatal complications. The risk of cesarean delivery is also increased in obese parturients. Anesthetic management of the obese parturient is challenging and requires adequate planning. Therefore, those patients should be referred to antenatal anesthetic consultation. Anesthesia-related complications and maternal mortality are increased in this patient population. The risk of difficult intubation is increased in obese patients. Neuraxial techniques are the preferred anesthetic techniques for cesarean delivery in obese parturients but can be technically challenging. An existing labor epidural catheter can be topped up for cesarean delivery. In patients who do not have a well-functioning labor epidural, a combined spinal epidural technique might be preferred over a single-shot spinal technique since it is technically easier in obese parturients and allows for extending the duration of the block as required. A continuous spinal technique can also be considered. Studies suggest that there is no need to reduce the dose of spinal bupivacaine in the obese parturient, but there is little data about spinal dosing in super obese parturients. Intraoperatively, patients should be placed in a ramped position, with close monitoring of ventilation and hemodynamic status. Adequate postoperative analgesia is crucial to allow for early mobilization. This can be achieved using a multimodal regimen incorporating neuraxial morphine (with appropriate observations) with scheduled nonsteroidal anti-inflammatory drugs and acetaminophen. Thromboprophylaxis is also important in this patient population due to the increased risk of thromboembolic complications. These patients should be monitored carefully in the postoperative period, since there is increased risk of postoperative complications in the morbidly obese parturients. PMID:27574464

  15. Managing anesthesia for cesarean section in obese patients: current perspectives

    PubMed Central

    Lamon, Agnes M; Habib, Ashraf S

    2016-01-01

    Obesity is a worldwide epidemic. It is associated with increased comorbidities and increased maternal, fetal, and neonatal complications. The risk of cesarean delivery is also increased in obese parturients. Anesthetic management of the obese parturient is challenging and requires adequate planning. Therefore, those patients should be referred to antenatal anesthetic consultation. Anesthesia-related complications and maternal mortality are increased in this patient population. The risk of difficult intubation is increased in obese patients. Neuraxial techniques are the preferred anesthetic techniques for cesarean delivery in obese parturients but can be technically challenging. An existing labor epidural catheter can be topped up for cesarean delivery. In patients who do not have a well-functioning labor epidural, a combined spinal epidural technique might be preferred over a single-shot spinal technique since it is technically easier in obese parturients and allows for extending the duration of the block as required. A continuous spinal technique can also be considered. Studies suggest that there is no need to reduce the dose of spinal bupivacaine in the obese parturient, but there is little data about spinal dosing in super obese parturients. Intraoperatively, patients should be placed in a ramped position, with close monitoring of ventilation and hemodynamic status. Adequate postoperative analgesia is crucial to allow for early mobilization. This can be achieved using a multimodal regimen incorporating neuraxial morphine (with appropriate observations) with scheduled nonsteroidal anti-inflammatory drugs and acetaminophen. Thromboprophylaxis is also important in this patient population due to the increased risk of thromboembolic complications. These patients should be monitored carefully in the postoperative period, since there is increased risk of postoperative complications in the morbidly obese parturients. PMID:27574464

  16. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What is the purpose of the 7(j...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C....

  17. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false What is the purpose of the 7(j...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C....

  18. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false What is the purpose of the 7(j...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C....

  19. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 13 Business Credit and Assistance 1 2012-01-01 2012-01-01 false What is the purpose of the 7(j...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C....

  20. 13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false What is the purpose of the 7(j...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C....

  1. 50 CFR 679.65 - Bering Sea Chinook Salmon Bycatch Management Program Economic Data Report (Chinook salmon EDR...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Bering Sea Chinook Salmon Bycatch Management Program Economic Data Report (Chinook salmon EDR program). 679.65 Section 679.65 Wildlife and... and Aleutian Island Directed Pollock Fishery Management Measures § 679.65 Bering Sea Chinook...

  2. 50 CFR 679.65 - Bering Sea Chinook Salmon Bycatch Management Program Economic Data Report (Chinook salmon EDR...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Bering Sea Chinook Salmon Bycatch Management Program Economic Data Report (Chinook salmon EDR program). 679.65 Section 679.65 Wildlife and... and Aleutian Island Directed Pollock Fishery Management Measures § 679.65 Bering Sea Chinook...

  3. 50 CFR 679.65 - Bering Sea Chinook Salmon Bycatch Management Program Economic Data Report (Chinook salmon EDR...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Bering Sea Chinook Salmon Bycatch Management Program Economic Data Report (Chinook salmon EDR program). 679.65 Section 679.65 Wildlife and... and Aleutian Island Directed Pollock Fishery Management Measures § 679.65 Bering Sea Chinook...

  4. A cross-section plotting program (CSPP) for gridded (map) data

    USGS Publications Warehouse

    Wells, Richard B.; Faust, Charles R.; Mercer, James W.

    1976-01-01

    A FORTRAN program that prepares the Calcomp plotter tape for drawing cross-sections from gridded map data is described and documented. The program accepts gridded data of the form Z(x,y), where Z is the value at the grid intersection, (x,y). Up to 10 sets of Z(x,y) data for a given grid may be drawn on the same section. The positions of the end points of the cross-section are arbitrary. A bilinear interpolation scheme is used to obtain the Z(x,y) values along the specified cross-section. The program was designed to provide a visual aid for interpreting input and output data for two-dimensional (areal) finite-difference models used in aquifer analysis and geothermal reservoir simulation. The program should, however, be useful for drawing cross-sections of any multiple Z(x,y) gridded data. The computer code is called CSPP standing for Cross-Section Plotting Program.

  5. Recommendations for improvements to program and project management

    SciTech Connect

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  6. Improving Voluntary Environmental Management Programs: Facilitating Learning and Adaptation

    NASA Astrophysics Data System (ADS)

    Genskow, Kenneth D.; Wood, Danielle M.

    2011-05-01

    Environmental planners and managers face unique challenges understanding and documenting the effectiveness of programs that rely on voluntary actions by private landowners. Programs, such as those aimed at reducing nonpoint source pollution or improving habitat, intend to reach those goals by persuading landowners to adopt behaviors and management practices consistent with environmental restoration and protection. Our purpose with this paper is to identify barriers for improving voluntary environmental management programs and ways to overcome them. We first draw upon insights regarding data, learning, and adaptation from the adaptive management and performance management literatures, describing three key issues: overcoming information constraints, structural limitations, and organizational culture. Although these lessons are applicable to a variety of voluntary environmental management programs, we then present the issues in the context of on-going research for nonpoint source water quality pollution. We end the discussion by highlighting important elements for advancing voluntary program efforts.

  7. Disease management programs for CKD patients: the potential and pitfalls.

    PubMed

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  8. Heavy-section steel technology and irradiation programs-retrospective and prospective views

    SciTech Connect

    Nanstad, Randy K; Bass, Bennett Richard; Rosseel, Thomas M; Merkle, John Graham; Sokolov, Mikhail A

    2007-01-01

    In 1965, the Atomic Energy Commission (AEC), at the advice of the Advisory Committee on Reactor Safeguards (ACRS), initiated the process that resulted in the establishment of the Heavy Section Steel Technology (HSST) Program at Oak Ridge National Laboratory (ORNL). In 1989, the Heavy-Section Steel Irradiation (HSSI) Program, formerly the HSST task on irradiation effects, was formed as a separate program, and, in 2007, the HSST/HSSI Programs, sponsored by the U.S. Nuclear Regulatory Commission (USNRC), celebrated 40 years of continuous research oriented toward the safety of light-water nuclear reactor pressure vessels (RPV). This paper presents a summary of results from those programs with a view to future activities.

  9. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  10. Paper and Process: How Youth Programs Manage Program Intake, Individual Service Strategy Development, and Case Files.

    ERIC Educational Resources Information Center

    Callahan, Jim; McLaughlin, Brenda

    This guide presents information and materials to help youth programs manage program intake, design an individual service strategy (ISS) as mandated in the Workforce Investment Act, and manage case files. The materials are based on information obtained from staff working in seven successful youth workforce investment programs in Maryland,…

  11. MEKS: A program for computation of inclusive jet cross sections at hadron colliders

    NASA Astrophysics Data System (ADS)

    Gao, Jun; Liang, Zhihua; Soper, Davison E.; Lai, Hung-Liang; Nadolsky, Pavel M.; Yuan, C.-P.

    2013-06-01

    EKS is a numerical program that predicts differential cross sections for production of single-inclusive hadronic jets and jet pairs at next-to-leading order (NLO) accuracy in a perturbative QCD calculation. We describe MEKS 1.0, an upgraded EKS program with increased numerical precision, suitable for comparisons to the latest experimental data from the Large Hadron Collider and Tevatron. The program integrates the regularized patron-level matrix elements over the kinematical phase space for production of two and three partons using the VEGAS algorithm. It stores the generated weighted events in finely binned two-dimensional histograms for fast offline analysis. A user interface allows one to customize computation of inclusive jet observables. Results of a benchmark comparison of the MEKS program and the commonly used FastNLO program are also documented. Program SummaryProgram title: MEKS 1.0 Catalogue identifier: AEOX_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEOX_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland. Licensing provisions: Standard CPC licence, http://cpc.cs.qub.ac.uk/licence/licence.html No. of lines in distributed program, including test data, etc.: 9234 No. of bytes in distributed program, including test data, etc.: 51997 Distribution format: tar.gz Programming language: Fortran (main program), C (CUBA library and analysis program). Computer: All. Operating system: Any UNIX-like system. RAM: ˜300 MB Classification: 11.1. External routines: LHAPDF (https://lhapdf.hepforge.org/) Nature of problem: Computation of differential cross sections for inclusive production of single hadronic jets and jet pairs at next-to-leading order accuracy in perturbative quantum chromodynamics. Solution method: Upon subtraction of infrared singularities, the hard-scattering matrix elements are integrated over available phase space using an optimized VEGAS algorithm. Weighted events are generated and filled

  12. 77 FR 18731 - Public Housing and Section 8 Programs: Housing Choice Voucher Program: Streamlining the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... and docket number (FR-5453) and be sent to: HUD Desk Officer, Office of Management and Budget, New... rent determination based on similar unassisted units. The maximum amount the PHA can pay toward a...

  13. 20 CFR 669.670 - Who is eligible to receive services under the section 167 MSFW youth program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... section 167 MSFW youth program? 669.670 Section 669.670 Employees' Benefits EMPLOYMENT AND TRAINING... INVESTMENT ACT The MSFW Youth Program § 669.670 Who is eligible to receive services under the section 167 MSFW youth program? Disadvantaged youth, ages 14 through 21, who are individually eligible or...

  14. 20 CFR 669.670 - Who is eligible to receive services under the section 167 MSFW youth program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... section 167 MSFW youth program? 669.670 Section 669.670 Employees' Benefits EMPLOYMENT AND TRAINING... INVESTMENT ACT The MSFW Youth Program § 669.670 Who is eligible to receive services under the section 167 MSFW youth program? Disadvantaged youth, ages 14 through 21, who are individually eligible or...

  15. 20 CFR 669.670 - Who is eligible to receive services under the section 167 MSFW youth program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... section 167 MSFW youth program? 669.670 Section 669.670 Employees' Benefits EMPLOYMENT AND TRAINING... INVESTMENT ACT The MSFW Youth Program § 669.670 Who is eligible to receive services under the section 167 MSFW youth program? Disadvantaged youth, ages 14 through 21, who are individually eligible or...

  16. 20 CFR 669.670 - Who is eligible to receive services under the section 167 MSFW youth program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... section 167 MSFW youth program? 669.670 Section 669.670 Employees' Benefits EMPLOYMENT AND TRAINING... ACT The MSFW Youth Program § 669.670 Who is eligible to receive services under the section 167 MSFW youth program? Disadvantaged youth, ages 14 through 21, who are individually eligible or are members...

  17. 20 CFR 669.670 - Who is eligible to receive services under the section 167 MSFW youth program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... section 167 MSFW youth program? 669.670 Section 669.670 Employees' Benefits EMPLOYMENT AND TRAINING... ACT The MSFW Youth Program § 669.670 Who is eligible to receive services under the section 167 MSFW youth program? Disadvantaged youth, ages 14 through 21, who are individually eligible or are members...

  18. Export Management Specialist. A Training Program. Instructor's Edition.

    ERIC Educational Resources Information Center

    Oklahoma State Dept. of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    This publication provides instructors with materials for an export management specialist (EMS) training program. The objective of the training program is to assist companies in reaching their export goals by educating current and potential managers about the basics of exporting. It provides a foundation for considering international trade and for…

  19. 76 FR 42536 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... System Management Information Program on November 8, 2010, at 75 FR 68418. The final rule document also... Federal Highway Administration 23 CFR Part 511 RIN 2125-AF19 Real-Time System Management Information... available and share traffic and travel conditions information via real-time information programs as...

  20. Exercise Clothing for Children in a Weight-Management Program

    ERIC Educational Resources Information Center

    Carroll, Kate; Alexander, Marina; Spencer, Virginia

    2007-01-01

    This study investigated whether clothing can be perceived as a form of encouragement for success in a weight management exercise program. A small (n = 30) sample of children and parents, enrolled in a weight-management exercise program, responded to a survey instrument that included questions regarding fit and comfort of the clothing children wore…

  1. Developing Higher Education Programs in Emergency Management: Ghana's Experience

    ERIC Educational Resources Information Center

    Yakubu, Mariama Bisongu

    2013-01-01

    Ghana is highly vulnerable and threatened by several hazards and has sought ways of minimizing impacts of hazards events over time including demonstrating an interest in developing an emergency management training and an higher education degree program. Yet, as of 2013, the country has not developed a disaster management training program or a…

  2. Sandia National Laboratories, California Chemical Management Program annual report.

    SciTech Connect

    Brynildson, Mark E.

    2012-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

  3. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  4. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  5. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  6. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  7. 24 CFR 5.661 - Section 8 project-based assistance programs: Approval for police or other security personnel to...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... programs: Approval for police or other security personnel to live in project. 5.661 Section 5.661 Housing... assistance programs: Approval for police or other security personnel to live in project. (a) Applicability. This section describes when a Section 8 owner may lease a Section 8 unit to police or other...

  8. Hanford environmental management program multi-year work plan FY1998

    SciTech Connect

    Giese, K.A.

    1997-08-25

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year`s work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ``Work Authorization`` identifies the impacted scope and requires the Contracting Officer`s or Assistant Manager-Contracting Officer`s Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ``Project Summary Section`` and Section Two is titled the ``Additional Sections at the Project Baseline Summaries Level``. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS {number_sign} RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  9. 20 CFR 669.600 - What is the purpose of the WIA section 167 MSFW Youth Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MSFW Youth Program? 669.600 Section 669.600 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... ACT The MSFW Youth Program § 669.600 What is the purpose of the WIA section 167 MSFW Youth Program? The purpose of the MSFW youth program is to provide an effective and comprehensive array...

  10. 20 CFR 669.600 - What is the purpose of the WIA section 167 MSFW Youth Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MSFW Youth Program? 669.600 Section 669.600 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... ACT The MSFW Youth Program § 669.600 What is the purpose of the WIA section 167 MSFW Youth Program? The purpose of the MSFW youth program is to provide an effective and comprehensive array...

  11. 20 CFR 669.600 - What is the purpose of the WIA section 167 MSFW Youth Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... MSFW Youth Program? 669.600 Section 669.600 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... ACT The MSFW Youth Program § 669.600 What is the purpose of the WIA section 167 MSFW Youth Program? The purpose of the MSFW youth program is to provide an effective and comprehensive array...

  12. 45 CFR 1336.30 - Eligibility under sections 804 and 805 of the Native American Programs Act of 1974.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Native American Programs Act of 1974. 1336.30 Section 1336.30 Public Welfare Regulations Relating to... THE ADMINISTRATION FOR NATIVE AMERICANS, NATIVE AMERICAN PROGRAMS NATIVE AMERICAN PROGRAMS Native American Projects § 1336.30 Eligibility under sections 804 and 805 of the Native American Programs Act...

  13. Increasing access and support for emergency management higher education programs.

    PubMed

    Cwiak, Carol L

    2014-01-01

    The number of emergency management higher education programs has grown dramatically since 1994 when the FEMA Higher Education Program was created to propagate and support such growth. Data collected annually since 2007 from emergency management higher education programs shows that these programs face some consistent challenges. These challenges were coupled with annual data on program access and support indicators via dimensional analysis to answer the questions: To what extent are the challenges linked to a lack of access or support? If there is linkage, what can be gleaned from these linkages that can help address the challenges through improving access and support? The analysis showed that lack of access to funding and resources, and lack of support from partner organizations, has an impact on emergency management higher education. Discussion of that impact is followed with detailed recommendations that are focused on strengthening both internal and external access and support relationships for emergency management higher education programs.

  14. Community energy auditing: experience with the comprehensive community energy management program

    SciTech Connect

    Moore, J.L.; Berger, D.A.; Rubin, C.B.; Hutchinson, P.A. Sr.; Griggs, H.M.

    1980-09-01

    The report provides local officials and staff with information on lessons from the audit, projection, and general planning experiences of the Comprehensive Community Energy Management Program (CCEMP) communities and provides ANL and US DOE with information useful to the further development of local energy management planning methods. In keeping with the objectives, the report is organized into the following sections: Section II presents the evaluation issues and key findings based on the communities' experiences from Spring of 1979 to approximately March of 1980; Section III gives an organized review of experience of communities in applying the detailed audit methodology for estimating current community energy consumption and projecting future consumption and supply; Section IV provides a preliminary assessment of how audit information is being used in other CCEMP tasks; Section V presents an organized review of preliminary lessons from development of the community planning processes; and Section VI provides preliminary conclusions on the audit and planning methodology. (MCW)

  15. Children's Fitness. Managing a Running Program.

    ERIC Educational Resources Information Center

    Hinkle, J. Scott; Tuckman, Bruce W.

    1987-01-01

    A running program to increase the cardiovascular fitness levels of fourth-, fifth-, and sixth-grade children is described. Discussed are the running environment, implementation of a running program, feedback, and reinforcement. (MT)

  16. Program Planning Concepts in Solid Waste Management

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  17. Management philosophies as applied to major NASA programs

    NASA Technical Reports Server (NTRS)

    Dannenberg, K. K.

    1974-01-01

    A definition of 'management philosophies' is discussed explaining the position of NASA in the planning and control of space programs and technology. The impact of these philosophies on the Apollo and Saturn 1 programs are described along with the need for the Saturn 5 spacecraft and launch site development. Case studies are included and describe unscheduled events where management decisions were necessary to keep programs on track.

  18. Assurance management program for the 30 Nova laser fusion project

    SciTech Connect

    Levy, A.J.

    1983-11-30

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project.

  19. Management Development and Training Program for Colleges and Universities. Program Handbook, May 1978.

    ERIC Educational Resources Information Center

    Higher Education Management Inst., Coconut Grove, FL.

    A Management Development and Training Program has been developed by the Higher Education Management Institute to improve the overall functioning of higher education organizations. The Institute believes management development and training can: add to individuals' knowledge and skills, increase awareness of management processes and systems;…

  20. 20 CFR 664.410 - Must local programs include each of the ten program elements listed in WIA section 129(c)(2) as...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... program elements listed in WIA section 129(c)(2) as options available to youth participants? 664.410... ACTIVITIES UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Youth Program Design, Elements, and Parameters § 664.410 Must local programs include each of the ten program elements listed in WIA section 129(c)(2)...