13 CFR 124.701 - What is the purpose of the 7(j) management and technical assistance program?
Code of Federal Regulations, 2010 CFR
2010-01-01
...) management and technical assistance program? 124.701 Section 124.701 Business Credit and Assistance SMALL...) Business Development Management and Technical Assistance Program § 124.701 What is the purpose of the 7(j) management and technical assistance program? Section 7(j)(1) of the Small Business Act, 15 U.S.C. 636(j)(1...
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn
2012-01-01
In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Contractor Facilities 242.7400 General. (a) Program managers may conclude that they need technical... manager may assign technical representatives under the procedures in 242.7401. (b) A technical representative is a representative of a DoD program, project, or system office performing non-CAS technical...
USAF/SCEEE Graduate Student Summer Support Program (1982). Management and Technical Report.
1982-10-01
AD-A130 767 USAF/SCEEE GRADUATE STUDENT SUMMER SUPPORT PROGRAM (1982) MANAGEMENT AND..(U) SOUTHEASTERN CENTER FORELECTRICAL ENGINEERING EDUCATION INC...SUMMER SUPPORT PROGRAM Conducted by Southeastern Center for Electrical Engineering Education under USAF Contract Number F49620-82-C-0035 MANAGEMENT ...UNITED STATES AIR FORCE GRADUATE STUDENT SL24MER SUPPORT PROGRAM 1982 PROGRAM MANAGEMENT AND TECHNICAL REPORT SOUTHEASTERN CENTER FOR ELECTRICAL
NASA Technical Reports Server (NTRS)
English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.
1977-01-01
The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.
25 CFR 286.11 - Management and technical assistance.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...
25 CFR 286.11 - Management and technical assistance.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...
25 CFR 286.11 - Management and technical assistance.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Management and technical assistance. 286.11 Section 286.11... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...
25 CFR 286.11 - Management and technical assistance.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Management and technical assistance. 286.11 Section 286... DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making... insure that competent management and technical assistance is available to the grantee in the preparation...
TWRS Configuration management program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
The Office of Environmental Management technical reports: a bibliography
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-07-01
The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.
NASA Technical Reports Server (NTRS)
Hernon, Peter (Editor); Mcclure, Charles R. (Editor); Pinelli, Thomas E. (Editor)
1990-01-01
NASA scientific and technical information (STI) programs are discussed. Topics include management of information in a research and development agency, the new space and Earth science information systems at NASA's archive, scientific and technical information management, and technology transfer of NASA aerospace technology to other industries.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
10 CFR 905.40 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Technical assistance. 905.40 Section 905.40 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Energy Services § 905.40 Technical assistance. Western shall establish a program that provides technical assistance to customers to conduct integrated...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
MSFC Skylab Apollo Telescope Mount. [a technical history and management critique
NASA Technical Reports Server (NTRS)
Morse, A. R.
1974-01-01
A technical history and management critique of the Skylab Apollo Telescope Mount (ATM) from initial conception through the design, manufacturing, testing and prelaunch phases is presented. A mission performance summary provides a general overview of the ATM's achievements in relationship to its design goals. Recommendations and conclusions applicable to hardware design, test program philosophy and performance, and program management techniques for the ATM with potential application to future programs are also discussed.
25 CFR 286.11 - Management and technical assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Management and technical assistance. 286.11 Section 286.11 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ECONOMIC ENTERPRISES INDIAN BUSINESS DEVELOPMENT PROGRAM § 286.11 Management and technical assistance. (a) Prior to and concurrent with the making...
2011-12-01
systems engineering technical and technical management processes. Technical Planning, Stakeholders Requirements Development, and Architecture Design were...Stakeholder Requirements Definition, Architecture Design and Technical Planning. A purposive sampling of AFRL rapid development program managers and engineers...emphasize one process over another however Architecture Design , Implementation scored higher among Technical Processes. Decision Analysis, Technical
Support Equipment Management in the F/A-18 Program
1986-12-01
or character (such as manuals and drawings) of a scientific or technical nature. Computer programs and related software are not technical data...documentation of computer programs and related software are. Also excluded are financial data or other information related to contract administration. 6...management in the F/A-18 program . Graeser, Kenneth S. http://hdl.handle.net/10945/22133 Downloaded from NPS Archive: Calhoun NAVAL POSTGRADUATE SCHOOL Monterey
ITS/CVO technical project management for non-technical managers : participant guide
DOT National Transportation Integrated Search
1998-09-01
In 1996, the FHWA Office of Motor Carriers (OMC) identified the need to develop a Technical Training Program to support the deployment of Intelligent Transportation System (ITS) technologies for Commercial Vehicle Operations (CVO). The workforce -...
Technical and Management Information System (TMIS)
NASA Technical Reports Server (NTRS)
Rau, Timothy R.
1987-01-01
The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.
DOE scientific and technical information management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beasly, M.
The objective of this paper was a discussion of the mission objectives and program activities of the DOE Office of Scientific and Technical Information. Topics of discussion were: (1) program direction and structure; (2) representation in gov`t and international organizations; (3) management of information; and (4) consultation and assistance.
NASA STI Program Seminar: Electronic documents
NASA Technical Reports Server (NTRS)
1994-01-01
The theme of this NASA Scientific and Technical Information Program Seminar was electronic documents. Topics covered included Electronic Documents Management at the CASI, the Impact of Electronic Publishing on User Expectations and Searching Image Record Management, Secondary Publisher Considerations for Electronic Journal Literature, and the Technical Manual Publishing On Demand System (TMPODS).
A success paradigm for project managers in the aerospace industry
NASA Astrophysics Data System (ADS)
Bauer, Barry Jon
Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.
On-line Naval Engineering Skills Supplemental Training Program
2010-01-01
Defense Technical University ( DTU ), the technical content for courses would have to be provided by the Naval technical authorities...of technological knowledge related to design engineering such as the DTU , or expanded within the mission scope of an existing organization such as...management program as a training tool for naval design engineers such as the DTU or a technical extension of the DAU program for acquisition training
Security and emergency management technical assistance for the top 50 transit agencies
DOT National Transportation Integrated Search
2007-04-01
Between May 2002 and July 2006, the Federal Transit Administration (FTA) provided technical assistance to the top 50 transit agencies through the Security and Emergency Management Technical Assistance Program (SEMTAP). The scope and purpose of the pr...
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
77 FR 32013 - Truck Size and Weight; Technical Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-31
...-2012-0037] RIN 2125-AF45 Truck Size and Weight; Technical Correction AGENCY: Federal Highway...: This rule makes a technical correction to the regulations that govern Longer Combination Vehicles (LCV... INFORMATION CONTACT: John Nicholas, Truck Size and Weight Program Manager, Office of Freight Management and...
Teaching Leadership in Technical Programs at Community Colleges
ERIC Educational Resources Information Center
DeBlauw, Amanda L.; Daugherty, Jenny L.
2017-01-01
This descriptive study explored how community colleges are teaching leadership in technical programs. Leadership education curricular offerings were identified via a survey and selected programs reviewed. 68 Deans, Directors, or Chairpersons of a Business, Management, or Technology program completed the survey, representing 61 community colleges.…
25 CFR 170.170 - How are Indian LTAP centers managed?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ROADS PROGRAM Indian Reservation Roads Program Policy and Eligibility Indian Local Technical Assistance... Center Director and staff, with the advice of its technical panel under the Indian LTAP agreements. FHWA... technical panel consisting of one BIA Regional Road Engineer, one FHWA representative, one state DOT...
Urban Rail Supporting Technology Program Fiscal Year 1974 Year End Summary
DOT National Transportation Integrated Search
1975-03-01
Major areas include program management, technical support and application engineering, facilities development, test and evaluation, and technology development. Specific technical discussion includes track measurement systems; UMTA facilities developm...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
... Directorate; Technical Assistance Request and Evaluation AGENCY: National Protection and Programs Directorate... assistance requests from each State and territory. OEC will use the Technical Assistance Evaluation Form to... electronically. Evaluation forms may be submitted electronically or in paper form. The Office of Management and...
Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans
The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.
ERIC Educational Resources Information Center
Poston, Robin S.; Richardson, Sandra M.
2011-01-01
The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…
Mapping the global health employment market: an analysis of global health jobs.
Keralis, Jessica M; Riggin-Pathak, Brianne L; Majeski, Theresa; Pathak, Bogdan A; Foggia, Janine; Cullinen, Kathleen M; Rajagopal, Abbhirami; West, Heidi S
2018-02-27
The number of university global health training programs has grown in recent years. However, there is little research on the needs of the global health profession. We therefore set out to characterize the global health employment market by analyzing global health job vacancies. We collected data from advertised, paid positions posted to web-based job boards, email listservs, and global health organization websites from November 2015 to May 2016. Data on requirements for education, language proficiency, technical expertise, physical location, and experience level were analyzed for all vacancies. Descriptive statistics were calculated for the aforementioned job characteristics. Associations between technical specialty area and requirements for non-English language proficiency and overseas experience were calculated using Chi-square statistics. A qualitative thematic analysis was performed on a subset of vacancies. We analyzed the data from 1007 global health job vacancies from 127 employers. Among private and non-profit sector vacancies, 40% (n = 354) were for technical or subject matter experts, 20% (n = 177) for program directors, and 16% (n = 139) for managers, compared to 9.8% (n = 87) for entry-level and 13.6% (n = 120) for mid-level positions. The most common technical focus area was program or project management, followed by HIV/AIDS and quantitative analysis. Thematic analysis demonstrated a common emphasis on program operations, relations, design and planning, communication, and management. Our analysis shows a demand for candidates with several years of experience with global health programs, particularly program managers/directors and technical experts, with very few entry-level positions accessible to recent graduates of global health training programs. It is unlikely that global health training programs equip graduates to be competitive for the majority of positions that are currently available in this field.
Technical assistance for hazardous-waste reduction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, F.M.; McComas, C.A.
1987-12-01
Minnesota's Waste Management Board has established, developed, and funded the Minnesota Technical Assistance Program (MnTAP). The MnTAP programs offers technical assistance to generators of hazardous waste by offering telephone and onsite consultation, a waste reduction resource bank, information dissemination, a student intern program, and research awards for waste reduction projects. The program has completed three years of successful operation. The increasing interest in and use of MnTAP's services by hazardous-waste generators has justified the belief that state technical assistance programs have an important role to play in helping generators to reduce their waste production.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... revised the application of Risk- Managed Technical Specifications to Technical Specification 3.7.7, ``Control Room Makeup and Cleanup Filtration System.'' The purpose of the change was to correct a misapplication of the Configuration Risk Management Program that is currently allowed by the Technical...
ERCMExpress. Volume 1, Issue 1
ERIC Educational Resources Information Center
US Department of Education, 2005
2005-01-01
This is the inaugural issue of the Emergency Response and Crisis Management (ERCM) Technical Assistance Center's "ERCMExpress," and it focuses on the new technical assistance center. The center will support 243 grantees funded under the Emergency Response and Crisis Management program in managing and implementing their projects, and in sustaining…
Nuclear facility decommissioning and site remedial actions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knox, N.P.; Webb, J.R.; Ferguson, S.D.
1990-09-01
The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3)more » Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.« less
ERIC Educational Resources Information Center
National Alliance of Business, Inc., Washington, DC.
This guide offers a practical approach for operating summer youth employment programs that involves cooperation among private businesses and local organizations. A timetable provides a month-by-month schedule. Seven sections discuss management responsibilities. Program Planning covers scope, goals, and coordination. Program Management addresses…
Nutritional Management of Acute Diarrhea in Infants and Children.
ERIC Educational Resources Information Center
National Academy of Sciences-National Research Council, Washington, DC. Food and Nutrition Board.
Written primarily for health professionals advising on programs and policy related to nutrition and diarrhea therapy, this report is aimed at management of diarrhea in less-developed countries, but its information and technical insights are relevant to an understanding of diarrhea and its management throughout the world. Technical in orientation…
Project management in the Apollo program: An interdisciplinary study
NASA Technical Reports Server (NTRS)
Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.
1972-01-01
Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
...), National Protection and Programs Directorate (NPPD), Office of Infrastructure Protection (IP.../IP/IICD, 245 Murray Lane SW., Mailstop 0602, Arlington, VA 20598-0602. Email requests should go to... Technical Assistance Program (CAPTAP) is offered jointly by the NPPD/IP and the Federal Emergency Management...
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.
In 1988, a review was conducted of the business component of associate in arts and associate in science (AS) degree programs, and of the certificate programs in business in Florida community colleges and area vocational-technical centers. Focusing primarily on business programs in marketing, general business management, and small business…
Repository-based software engineering program: Concept document
NASA Technical Reports Server (NTRS)
1992-01-01
This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.
Lessons Learned from the Everglades Collaborative Adaptive Management Program
Recent technical papers explore whether adaptive management (AM) is useful for environmental management and restoration efforts and discuss the many challenges to overcome for successful implementation, especially for large-scale restoration programs (McLain and Lee 1996; Levine ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919.7013 Reports. (a) Prior to performing an evaluation of a Mentor's performance under its Mentor-Protege Agreement for use in award fee evaluations, the Mentor-Protege Program Manager must consult with the cognizant DOE technical program manager...
5 CFR 362.204 - Development, evaluation, promotion, and certification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... be placed, with full-time management and/or technical responsibilities consistent with the Fellow's... certification. 362.204 Section 362.204 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PRESIDENTIAL MANAGEMENT FELLOWS PROGRAM Program Administration § 362.204 Development, evaluation...
NASA Technical Standards Program
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.; Parker, Nelson C. (Technical Monitor)
2002-01-01
The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program's function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned-standards integration system. The Program maintains a 'one stop-shop' Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.
NASA Technical Standards Program
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, WIlliam W.
2003-01-01
The NASA Technical Standards Program was officially established in 1997 as result of a directive issued by the Administrator. It is responsible for Agency wide technical standards development, adoption (endorsement), and conversion of Center-unique standards for Agency wide use. One major element of the Program is the review of NSA technical standards products and replacement with non-Government Voluntary Consensus Standards in accordance with directions issued by the Office of Management and Budget. As part of the Program s function, it developed a NASA Integrated Technical Standards Initiative that consists of and Agency wide full-text system, standards update notification system, and lessons learned - standards integration system. The Program maintains a "one stop-shop" Website for technical standards ad related information on aerospace materials, etc. This paper provides information on the development, current status, and plans for the NAS Technical Standards Program along with metrics on the utility of the products provided to both users within the nasa.gov Domain and the Public Domain.
Marketing: Managing the Marketing Mix. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Fleming, Lian; And Others
This courseware evaluation rates the Marketing: Managing the Marketing Mix program developed by Control Data Limited. (This program--not contained in this document--is designed to introduce decisions made by marketing managers during the implementation phase of marketing.) Part A describes the program in terms of subject area (marketing, decision…
45 CFR 2524.10 - For what purposes will technical assistance and training funds be made available?
Code of Federal Regulations, 2011 CFR
2011-10-01
... programs; (6) Encourage AmeriCorps programs to adhere to risk management procedures, including the training of participants in appropriate risk management practices; and (7) Assist in such other manner as the... such programs to build an ethic of civic responsibility; (4) Develop the management and budgetary...
24 CFR 901.235 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 901.235... DEVELOPMENT PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM § 901.235 Technical assistance. (a) The Department may provide technical assistance to a PHA that is in substantial default. (b) The Department may...
Management of optics. [for HEAO-2 X ray telescope
NASA Technical Reports Server (NTRS)
Kirchner, T. E.; Russell, M.
1981-01-01
American Science and Engineering, Inc., designed the large X-ray optic for the HEAO-2 X-ray Telescope. The key element in this project was the High Resolution Mirror Assembly (HRMA), subcontracting the fabrication of the optical surfaces and their assembly and alignment. The roles and organization of the key participants in the creation of HRMA are defined, and the degree of interaction between the groups is described. Management of this effort was extremely complex because of the intricate weaving of responsibilities, and AS&E, as HEAO-2 Program managers, needed to be well versed in the scientific objectives, the technical requirements, the program requirements, and the subcontract management. Understanding these factors was essential for implementing both technical and management controls, such as schedule and budget constraints, in-process control, residence requirements, and scientist review and feedback. Despite unforeseen technical problems and interaction differences, the HEAO-2 was built on schedule and to specification.
Study of Online Instruction Methodologies for the DTIC Training Program.
1981-02-01
Lockheed Information Retrieval Service (LIRS) (2 programs) b. University of Denver Graduate School of Librarianship and Information Management (GSLIM) c...program -for a reasonably typical lecture-based academic program University of Denver Graduate School of Librarianship and Information Management (GSLIM...Lockheed Information Retrieval Service (LIRS) University of Denver Graduate School of Librarianship and Information Management (GSLIM) Defense Technical
Technical Leadership Development Program
2010-12-13
the traditional tenets of leadership and management , systems thinking, understanding SOS issues, and thinking and acting holistically. Our research...international element 2.0 Enterprise Leadership and Management UNCLASSIFIED Contract Number: H98230-08-D-0171 DO 002. TO002, RT 004 Report No...mechanisms for leadership of the overall technical effort, for systems engineering, for requirements, management , and for systems integration. o Develop
2008-09-01
ITP . Assessment Indicators: • Has the risk management team (RMT) provided a risk management plan (RMP)? − Does the RMP provide an organized...processes. Diskettes, which contain the necessary programs for accessing BMP◊NET from IBM -compatible or Macintosh computers with a modem, and answers to
Ohio Business Management. Technical Competency Profile (TCP).
ERIC Educational Resources Information Center
Ray, Gayl M.; Wilson, Nick; Mangini, Rick
This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in business management. Ohio College Tech Prep Program standards are described, and a key to profile codes is provided. Sample occupations in this career area, such as management trainee, product manager, and advertising…
Building Staff Competencies and Selecting Communications Methods for Waste Management Programs.
ERIC Educational Resources Information Center
Richardson, John G.
The Waste Management Institute provided in-service training to interested County Extension agents in North Carolina to enable them to provide leadership in developing and delivering a comprehensive county-level waste management program. Training included technical, economic, environmental, social, and legal aspects of waste management presented in…
Defense Research: Improved Management of DOD’s Technical Corrosion Collaboration Program Needed
2014-05-01
Education and Research on Corrosion and Material Performance TCC Technical Corrosion Collaboration UCC University Corrosion Collaboration This is...is the successor to the University Corrosion Collaboration ( UCC ) pilot program, established in 2008. The TCC program builds on efforts of the UCC ...going from a pilot to a full program. They indicated that the UCC pilot program naturally evolved into the TCC pilot program in 2011, and the pilot
The Leadership Improvement Modules of the Precommissioning Leadership Assessment Program
1986-02-01
Institute - Patricia Knight Davis Development Dimensions International DTIC ELECTE SEP 0 3W U5 D Leadership and Management Technical Area Manpower and... Management skills Development Management training Interpersonal skills Remedial training Leadership skills Role playing IL ASISRACT (Cl -ewi rebb emem II by...Burke Army Research Institute Patricia Knight Davis Development Dimensions International Leadership and Management Technical Area William W. Haythorn
Installation Restoration Program Preliminary Assessment, Big Mountain Radio Relay Station, Alaska
1989-04-01
DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design, project management and implementation of various...management functions, as well as direct involvement in project marketing, corporate computer and CAD operations, and company R&D efforts. 5 DETOX , Inc...interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as sale and management of several substantial and
ERIC Educational Resources Information Center
Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.
This document outlines the curriculum of Louisiana's accounting technology associate degree program, which is a 6-term (77-credit hour) competency-based program designed to prepare students for employment as accounting technicians providing technical administrative support to professional accountants and other financial management personnel.…
12 CFR 1805.303 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... proposes to become a CDFI. Such technical assistance may include training for management and other... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Technical assistance. 1805.303 Section 1805.303... COMMUNITY DEVELOPMENT FINANCIAL INSTITUTIONS PROGRAM Use of Funds/Eligible Activities § 1805.303 Technical...
78 FR 44104 - Notice of Intent To Issue a Funding Opportunity Announcement; Technical Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... Funding Opportunity Announcement; Technical Assistance AGENCY: Federal Energy Management Program, Office.... This notice also is to inform Federal agencies of the availability of technical assistance in advance.... FOR FURTHER INFORMATION CONTACT: For requests for technical assistance regarding CHP, please contact...
Management of information in a research and development agency
NASA Technical Reports Server (NTRS)
Keene, Wallace O.
1990-01-01
The NASA program for managing scientific and technical information (STI) is examined, noting the technological, managerial, educational, and legal aspects of transferring and disseminating information. A definition of STI is introduced and NASA's STI-related management programs are outlined. Consideration is given to the role of STI management in NASA mission programs, research efforts supporting the management and use of STI, STI program interfaces, and the Automated Information Management Program to eliminate redundant automation efforts in common administrative functions. The infrastructure needed to manage the broad base of NASA information and the interfaces between NASA's STI management and external organizations are described.
National Aeronautics and Space Administration Scientific and Technical Information Programs.
ERIC Educational Resources Information Center
Pinelli, Thomas E., Ed.
1990-01-01
Eleven articles discuss informational and educational programs of the National Aeronautics and Space Administration (NASA). Some of the areas discussed include scientific and technical information management, the new Space and Earth Science Information Systems, transfer of technology to other industries, intellectual property issues, and the…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-20
... of 20 hours of individual or group counseling sessions to small businesses per month. (D) Planning... training programs, such as, business assessment, management training, counseling, technical assistance... business counseling, and technical assistance with small businesses currently doing business with public...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-27
... contracts and subcontracts portfolio. 3. Provide a minimum of 20 hours of individual or group counseling... training programs, such as, business assessment, management training, counseling, technical assistance... information dissemination, small business counseling, and technical assistance with small businesses currently...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-03
... contracts and subcontracts portfolio. 3. Provide a minimum of 20 hours of individual or group counseling... programs, such as, business assessment, management training, counseling, technical assistance, marketing... dissemination, small business counseling, and technical assistance with small businesses currently doing...
75 FR 6839 - Technical Service Provider Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-12
... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...
Fashion Production and Management Program Guide.
ERIC Educational Resources Information Center
Georgia Univ., Athens. Div. of Vocational Education.
This program guide presents the standard fashion production and management curriculum for technical institutes in Georgia. It is designed to relate primarily to the development of those skills needed to become a qualified alterationist, clothing design assistant, home textiles assistant, fashion management assistant, or tailoring assistant. A…
1991-05-01
Bio/Molecular Science & Engineering High Resolution Patterning Program Manager Archaebacteria Research Program Manager ONT Receptor Based Biosensor...CMC) in discharging their responsibilities on matters of general scientific and technical interest to the United States in the United Kingdom , Europe
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S.
This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.
UW-Stout's Bachelor's in Industrial Management
ERIC Educational Resources Information Center
Dittmann, Wendy
2008-01-01
The Bachelor of Science in Industrial Management (BSIM) was designed for technical college graduates with work experience because the University of Wisconsin-Stout (UW-Stout) recognized a need among adult students with technical college degrees. The program was developed to provide these students with an opportunity to earn baccalaureate degrees…
45 CFR 2524.10 - For what purposes will technical assistance and training funds be made available?
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Promote leadership development in such programs; (3) Improve the instructional and programmatic quality of such programs to build an ethic of civic responsibility; (4) Develop the management and budgetary... programs; (6) Encourage AmeriCorps programs to adhere to risk management procedures, including the training...
1990-01-01
RI 02871 Program Manager: T. DEEGAN Contract #: Title: LF DETECTION OF AIRCRAFT Topic #: DARPA90-049 Office: ID #: 50506 TECHNICAL ABSTRACT - COMBAT...INNOVATION RESEARCH PROGRAM - PHASE I SDIO Solicitation 90.1 TORRANCE, CA 90505 Program Manager: JAMES E CRAIG Contract #: Title: NONINTRUSIVE OPTICAL
Student Flow Model SFM-IA: System Documentation. Technical Report 41B. Preliminary Edition.
ERIC Educational Resources Information Center
Busby, John C.; Johnson, Richard S.
Technical specifications, operating procedures, and reference information for the National Center for Higher Education Management Systems' (NCHEMS) Student Flow Model (SFM) computer programs are presented. Included are narrative descriptions of the system and its modules, specific program documentation for each of the modules, system flowcharts,…
[Assessment of the Space Station Program
NASA Technical Reports Server (NTRS)
Kerrebrock, Jack L.
1994-01-01
This letter report by the National Research Council's (NRC's) Aeronautics and Space Engineering Board addresses comments on NASA's response to the Board's 1993 letter report, NASA's response to technical and management recommendations from previous NRC technical reports on the Space Station, and an assessment of the current International Space Station Alpha (ISSA) program.
ERIC Educational Resources Information Center
Rocker, JoAnne; Roncaglia, George J.; Heimerl, Lynn N.; Nelson, Michael L.
Interoperability and data-exchange are critical for the survival of government information management programs. E-government initiatives are transforming the way the government interacts with the public. More information is to be made available through Web-enabled technologies. Programs such as the NASA's Scientific and Technical Information (STI)…
Officer Computer Utilization Report
1992-03-01
Shipboard Non-tactical ADP Program (SNAP),Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM)). Mainframe - An extremely...ADP Program (SNAP), Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM), etc.) @0230@6 7 7. Technical/tactical systems (e.g
Annual Technical Symposium (27th) on Challenges of the Nineties - Accomplishing More with Less
1990-05-23
Cycle Manager , Surface Ship Silencing, Steam Propulsion Surface Combatant Program Office, NAVSEA r~~CONTENTS TAB . "ORDNANCE INDUSTRIAL AND FACILITY...EXTENSION PROGRAM"- 5 CDR Miles Kikuta, Assistant Program Manager , Aircraft Carrier Program Office, Surface Combatants Directorate, NAVSEA _(..-I"DESIGN...MAINTENANCE INTERFACE: A KEY TO NAVAL 6 SHIPYARD PERFORMANCE%-3 Philip R. Green, Industrial Specialist, Industrial and Facility Management Directorate
Nuclear waste management. Semiannual progress report, October 1982-March 1983
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chikalla, T.D.; Powell, J.A.
1983-06-01
This document is one of a series of technical progress reports designed to report radioactive waste management programs at the Pacific Northwest Laboratory. Accomplishments in the following programs are reported: waste stabilization; Materials Characterization Center; waste isolation; low-level waste management; remedial action; and supporting studies.
Apollo lunar orbital sciences program alpha and X-ray spectrometers
NASA Technical Reports Server (NTRS)
1972-01-01
The development of the alpha and X-ray spectrometers which were used on the Apollo 15 and 16 flights is discussed. Specific subjects presented are: (1) lunar program management, (2) scientific and technical approach, (3) major test programs, (4) reliability, quality assurance, and safety, and (5) subcontract management.
Installation Restoration Program Preliminary Assessment Naknek Recreational Camps, Alaska
1989-04-01
training, as well as other environmental matters. DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design...operations, and company R&D efforts. 3 DETOX . Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United States, responsibilities...resulted in establishing a widespread customer interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as
Ohio Medical Office Management. Technical Competency Profile (TCP).
ERIC Educational Resources Information Center
Ray, Gayl M.; Wilson, Nick; Mangini, Rick
This document provides a framework for a broad-based secondary and postsecondary curriculum to prepare students for employment in medical office management. The first part of the technical competency profile (TCP) contains the following items: an explanation of the purpose and scope of Ohio's TCPs; college tech prep program standards; an overview…
Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills
ERIC Educational Resources Information Center
Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth
2008-01-01
Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…
ERIC Educational Resources Information Center
Scott, Paul; Moye, Mike
Developed to assist the building-level administrator in implementing a curriculum management system, this handbook considers two of five duties the vocational administrator must perform to meet the obligations of curriculum management: (1) performing curriculum management functions for the vocational program and (2) implementing and conducting an…
Selected Technical Spin Offs from the Space Program
NASA Technical Reports Server (NTRS)
Gilmore, H. L.
1970-01-01
The report describes some of the problems which the National Aeronautics and Space Administration has encountered in getting people to understand how the general public has profited from the technical discoveries of the space program. Next, it describes NASA's Technology Utilization Program and comments on it. It then describes some of the many spin-offs from the space program. These include examples from management technology, communications, aeronautics, medicine, fabrics highway safety, and weather forecasting.
NASA Technical Reports Server (NTRS)
Montoya, G.; Boldon, P.
1985-01-01
The Space Station Program is highly complex not only in its technological goals and requirements but also in its organizational structure. Eight Contractor teams supporting four NASA centers plus Headquarters must depend on effective exchange of information--the lifeblood of the program. The Technical and Management Information System (TMIS) is the means by which this exchange can take place. Value of the TMIS in increasing productivity comes primarily from its ability to make the right information available to whomever needs it when it is needed. Productivity of the aerospace professional and how it can be enhanced by the use of specifically recommended techniques and procedures for information management using the TMIS are discussed.
ERIC Educational Resources Information Center
Maylath, Bruce, Ed.
This proceedings presents 43 papers delivered at the 2001 annual meeting of the Council for Programs in Technical and Scientific Communication (CPTSC). Papers in the proceedings include the following: "Act IV: On Being Less Invisible" (Bill Karis); "Building a Community of Professional Communicators by Mapping Needs and Assets"…
NASA Technical Reports Server (NTRS)
Kaye, Karen
1993-01-01
Multimedia initiative objectives for the NASA Scientific and Technical Information (STI) program are described. A multimedia classification scheme was developed and the types of non-print media currently in use are inventoried. The NASA STI Program multimedia initiative is driven by a changing user population and technical requirements in the areas of publications, dissemination, and user and management support.
1983-07-01
TEST CHART NATIONAL BVIREAU OF StANARS-1963- I AQUATIC PLANT CONTROL RESEARCH PROGRAM TECHNICAL REPORT A-78-2 LARGE-SCALE OPERATIONS MANAGEMENT TEST OF...Waterways Experiment Station P. 0. Box 631, Vicksburg, Miss. 39180 83 11 01 018 - I ., lit I III I | LARGE-SCALE OPERATIONS MANAGEMENT TEST OF USE OF THE...No. 3. RECIPIENT’S CATALOG NUMBER Technical Report A-78-2 Aa 1 Lj 19 ________5!1___ A. TITLE (Ad Subtitle) LARGE-SCALE OPERATIONS MANAGEMENT S. TYPE
5 CFR 362.201 - Agency programs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency programs. 362.201 Section 362.201 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PRESIDENTIAL MANAGEMENT FELLOWS... short-, medium-, and long-term senior leadership and related (senior policy, professional, technical...
40 CFR 501.12 - Program description.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 501.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SEWAGE SLUDGE STATE... technical support, except where a State is seeking authorization for an established sewage sludge management... section, except where a State is seeking authorization for an established sewage sludge management program...
SBA’s 7(j) Management Assistance Program: Changes Needed to Improve Efficiency and Effectiveness.
1981-09-29
Ctanges Needed;( im6 prove Efficiency nd Effectiveness. The Small Business Administration provides management and technical assistance to small busi ...Representatives This report, which was prepared pursuant to Public Law 95-507, discusses the Small Business Administration’s 7(j) Management Assistance...Program. The report discusses the need for better program planning and management and recommends that the Small Business Administration make a number of
One System for Blood Program Information Management
Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.
1980-01-01
A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
ERIC Educational Resources Information Center
Rossing, Rainer C.
Owners or managers of 34 small and medium-sized hotels and restaurants in the Assiniboine Community College area were interviewed to acquire information for an entrepreneurial, regional hotel and restaurant (H/R) management training program in Manitoba. A literature review revealed the following: employability, vocational technical, and business…
The Development of a Planning, Programming and Budgeting System. Technical Report.
ERIC Educational Resources Information Center
Appelquist, Claes-Goran; Zandren, S.
In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…
World Energy Data System (WENDS). Volume XI. Nuclear fission program summaries
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-06-01
Brief management and technical summaries of nuclear fission power programs are presented for nineteen countries. The programs include the following: fuel supply, resource recovery, enrichment, fuel fabrication, light water reactors, heavy water reactors, gas cooled reactors, breeder reactors, research and test reactors, spent fuel processing, waste management, and safety and environment. (JWR)
2010-08-01
NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND...management; leads military in case of specialized survey; supervises more than 25 local civilian employees ; acts as technical expert during contract...Security Assistance Force Head- quarters Camp. I knew I could handle the job of project manager, but wondered about acting as contract manager, technical ex
2007-12-01
Program Manager PMO Program Manager Office POM Program Objective Memorandum PPE Personal Protective Equipment PPT Production Prove...test • Technical feasibility test • Engineering development test • Production prove-out test ( PPT ) • Software qualification test 22 • Live fire...improvement BIDS (P3I) system is equipped with a detection suite to include high volume samplers, a fluorescent particle counter/sizer, a flow
ERIC Educational Resources Information Center
Blakely, Gerald L.; And Others
1994-01-01
Consensus of survey responses from 155 of 600 human resource managers was as follows: management development programs emphasized technical skills at lower levels, entrepreneurial skills at senior levels; organizations with corporate growth strategies focused on more areas than those with stability or retrenchment strategies. (Muschewske's reaction…
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations : for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and E...
Establishing a scientific and technical information program: Planning and resource management
NASA Technical Reports Server (NTRS)
Blados, Walter R.
1992-01-01
In the last 50 years, technological advances have accelerated at a rate unprecedented in history. We are experiencing a tremendous expansion of scientific and technological effort in many directions, and the result is a fantastic increase in the accumulation of scientific and technical information (STI) and knowledge. An integral part of the research and development (R&D) process is the STI associated with it. STI is both a raw material (input) and a product (output) of this process. The topics addressed include the following: the value of STI, management of an STI program, program policy and guidance, organizational structure, data sources, training/orientation, and the current information environment.
1991-04-11
Perplexed: Think Energy Again. Video Enhanced SECAT - An Energy Program; Quality Ship Service Power with an Integrated Diesel Electric Propulsion...DIesign Branch (5011), NAVSEA * "Think Energy Again! Video Enhanced SECAT - 5 An Energy Program"’ Hasan Pehlivan, Mechanical Engineer/Ship Trials, Surface...1.015, or 1.5% increase.) Association of Scientists and Engineers 28th Annual Technical Symposium, 11 April 1991 THINK ENERGY AGAIN! A VIDEO ENHANCED
ERIC Educational Resources Information Center
Chen, Su-Chang
2010-01-01
This study aims to conduct experimental instruction on the human resource management unit of business management in practical competencies-oriented business program developed by Chen (2005). This study is based on the quasi-experiment method and the subjects are two classes of students in a four-year technical university who have completed the…
The NASA Scientific and Technical Information Program: Exploring challenges, creating opportunities
NASA Technical Reports Server (NTRS)
Sepic, Ronald P.
1993-01-01
The NASA Scientific and Technical Information (STI) Program offers researchers access to the world's largest collection of aerospace information. An overview of Program activities, products and services, and new directions is presented. The R&D information cycle is outlined and specific examples of the NASA STI Program in practice are given. Domestic and international operations and technology transfer activities are reviewed and an agenda for the STI Program NASA-wide is presented. Finally, the incorporation of Total Quality Management and evaluation metrics into the STI Program is discussed.
The Use of Workforce Assessment as a Component of Career and Technical Education Program Evaluation
ERIC Educational Resources Information Center
Bartlett, Kenneth R.; Schleif, Nicole L.; Bowen, Mauvalyn M.
2011-01-01
This research project examined the extent to which Career and Technical Education (CTE)-related programs use workforce needs assessment as a component of their evaluation activities. An employer perspective was used to develop a conceptual framework drawing on strategic human resource management theory. The extent and methods utilized for…
2010 Wind Program Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swisher, Randy; Clark, Charlton; Beaudry-Losique, Jacques
This report documents the evaluation of the technical, scientific, and business results of over 80 projects of the Wind Program, as well as the productivity and management effectiveness of the Wind Program itself.
Teaching Managers How to Manage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hylko, J.M.
2006-07-01
Following graduation from a college or university with a technical degree, or through years of experience, an individual's training and career development activities typically focus on enhancing technical problem-solving skills. However, as these technical professionals, herein referred to as 'Techies', advance throughout their careers, they may be required to accept and adapt to the role of being a manager, and must undergo a transition to learn and rely on new problem-solving skills. However, unless a company has a specific manager-trainee class to address this subject and develop talent from within, an employee's management style is learned and developed 'on themore » job'. Both positive and negative styles are nurtured by those managers having similar qualities. Unfortunately, a negative style often contributes to the deterioration of employee morale and ultimate closing of a department or company. This paper provides the core elements of an effective management training program for 'Teaching Managers How to Manage' derived from the Department of Energy's Integrated Safety Management System and the Occupational Safety and Health Administration 's Voluntary Protection Program. Discussion topics and real-life examples concentrate on transitioning an employee from a 'Techie' to a manager; common characteristics of being a manager; the history and academic study of management; competition, change and the business of waste management; what to do after taking over a department by applying Hylko's Star of Success; command media; the formal and informal organizational charts; chain of command; hiring and developing high-degree, autonomous employees through effective communication and delegation; periodic status checks; and determining if the program is working successfully. These common characteristics of a strong management/leadership culture and practical career tips discussed herein provide a solid foundation for any company or department that is serious about developing an effective management training program for its employees. In turn, any employee in any work environment can begin using this information immediately if they want to become a better manager. (authors)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... management of human error in its operations and system safety programs, and the status of PTC implementation... UP's safety management policies and programs associated with human error, operational accident and... Chairman of the Board of Inquiry 2. Introduction of the Board of Inquiry and Technical Panel 3...
75 FR 70966 - Transit Asset Management (TAM) Pilot Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... interoperability between diverse types of information technology systems through use of open data formats and... to develop asset management plans, technical assistance, data collection and a pilot program as... condition assessment methodologies, as well as new data collection and analysis activities. $3 million has...
48 CFR 903.104-1 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 903.104-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL IMPROPER BUSINESS... program manager. Program manager means the individual within DOE who: (1) Exercises authority on a day-to...) Is generally the person at the lowest organizational level who has authority to make technical and...
From the Shop Floor to the Executive Suite.
ERIC Educational Resources Information Center
Lemons, William L.
1985-01-01
Describes the Productivity Group, created by the Oklahoma State Department of Vocational and Technical Education. The Group boosts small businesses by making available quality management development programs and human resource consulting services. The article discusses program management, costs, and the business community's response. (CT)
Rescuing Dogs in the Frederick Community | Poster
Many Frederick National Lab employees have a favorite cause to which they volunteer a significant amount of time. For Dianna Kelly, IT program manager/scientific program analyst, Office of Scientific Operations, and Courtney Kennedy, associate technical project manager, Business Enterprise Systems, that cause is dog rescue.
INDOT Technical Training Plan : Appendix B
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix M
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix P
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix F
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix H
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix E
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix O
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix J
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix L
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix A
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix D
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix K
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix G
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix I
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix N
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
INDOT Technical Training Plan : Appendix C
DOT National Transportation Integrated Search
2012-04-01
The study provides the background documents necessary for the development of a Technical Training Plan and makes recommendations for the content and structure of such a plan for the District Operations, Operations, Capital Program Management, and Eng...
Environmental Measurements Laboratory fiscal year 1998: Accomplishments and technical activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erickson, M.D.
1999-01-01
The Environmental Measurements Laboratory (EML) is government-owned, government-operated, and programmatically under the DOE Office of Environmental Management. The Laboratory is administered by the Chicago Operations Office. EML provides program management, technical assistance and data quality assurance for measurements of radiation and radioactivity relating to environmental restoration, global nuclear nonproliferation, and other priority issues for the Department of Energy, as well as for other government, national, and international organizations. This report presents the technical activities and accomplishments of EML for Fiscal Year 1998.
Methods and Models of the Hanford Internal Dosimetry Program, PNNL-MA-860
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, Eugene H.; Bihl, Donald E.; Maclellan, Jay A.
2009-09-30
The Hanford Internal Dosimetry Program (HIDP) provides internal dosimetry support services for operations at the Hanford Site. The HIDP is staffed and managed by the Radiation and Health Technology group, within the Pacific Northwest National Laboratory (PNNL). Operations supported by the HIDP include research and development, the decontamination and decommissioning of facilities formerly used to produce and purify plutonium, and waste management activities. Radioelements of particular interest are plutonium, uranium, americium, tritium, and the fission and activation product radionuclides 137Cs, 90Sr, and 60Co. This manual describes the technical basis for the design of the routine bioassay monitoring program and formore » assessment of internal dose. The purposes of the manual are as follows: • Provide assurance that the HIDP derives from a sound technical base. • Promote the consistency and continuity of routine program activities. • Provide a historical record. • Serve as a technical reference for radiation protection personnel. • Aid in identifying and planning for future needs.« less
Nuclear facility decommissioning and site remedial actions: A selected bibliography, volume 9
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Knox, N.P.; Michelson, D.C.
1988-09-01
The 604 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the ninth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's remedial action programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilitiesmore » Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Subsections for sections 1, 2, 5, and 6 include: Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at (615) 576-0568 or FTS 626-0568.« less
Management. Program CIP: Business Management: 52.0204
ERIC Educational Resources Information Center
Murdock, Ashleigh Barbee, Ed.
2008-01-01
Secondary career-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…
ERIC Educational Resources Information Center
Public Technology, Inc., Washington, DC.
This technical guide is part of a packet of tools designed to assist state or local government practitioners in organizing and managing an energy conservation program. It gives information on adapting energy conservation methods to existing public buildings and on designing new public buildings with energy conservation in mind. It also discusses…
ERIC Educational Resources Information Center
Albashiry, Nabeel M.; Voogt, Joke M.; Pieters, Jules M.
2015-01-01
Learning about curriculum development is critical for middle managers of technical vocational institutions in order to assume curriculum leadership in maintaining and enhancing the quality and relevance of their educational programs. This case study reports on the design and effects of a professional development arrangement (PDA), with such a…
Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Michelson, D.C.; Knox, N.P.
1987-09-01
The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less
Technology Program Management Model (TPMM) Overview
2006-05-10
1 1 “Secure the High Ground” Jeff Craver Project Manager Space and Missile Defense Technical Center Jeff.Craver@US.Army.Mil ff r r r j t r i il...f i l t r ff. r r . r . il UNCLASSIFIED UNCLASSIFIED Technology Program Management Model (TPMM) Overview 05-10-2006 Report Documentation Page Form...DATES COVERED 00-00-2006 to 00-00-2006 4. TITLE AND SUBTITLE Technology Program Management Model (TPMM) Overview 5a. CONTRACT NUMBER 5b. GRANT
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
Environment, Safety and Health Self-Assessment Report Fiscal Year 2010
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robinson, Scott
2011-03-23
The Lawrence Berkeley National Laboratory (LBNL) Environment, Safety, and Health (ES&H) Self-Assessment Program was established to ensure that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The ES&H Self-Assessment Program, managed by the Office of Contractor Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The primary objective of the program is to ensure that work is conducted safely and with minimal negative impact to workers, the public, and the environment. Self-assessment follows the five core functions and guiding principles of ISM. Self-assessment is the mechanism used to promote the continuousmore » improvement of the Laboratory's ES&H programs. The process is described in the Environment, Safety, and Health Assurance Plan (PUB-5344) and is composed of three types of self-assessments: Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review. The Division ES&H Self-Assessment Manual (PUB-3105) provides the framework by which divisions conduct formal ES&H self-assessments to systematically identify program deficiencies. Issue-specific assessments are designed and implemented by the divisions and focus on areas of interest to division management. They may be conducted by teams and involve advance planning to ensure that appropriate resources are available. The ES&H Technical Assurance Program Manual (PUB-913E) provides the framework for systematic reviews of ES&H programs and processes. The ES&H Technical Assurance Program Assessment is designed to evaluate whether ES&H programs and processes are compliant with guiding regulations, are effective, and are properly implemented by LBNL divisions. The Division ES&H Peer Review Manual provides the framework by which division ISM systems are evaluated and improved. Peer Reviews are conducted by teams under the direction of senior division management and focus on higher-level management issues. Peer Review teams are selected on the basis of members knowledge and experience in the issues of interest to the division director. LBNL periodically requests in-depth independent assessments of selected ES&H programs. Such assessments augment LBNL's established assessment processes and provide an objective view of ES&H program effectiveness. Institutional Findings, Observations, and Noteworthy Practices identified during independent assessments are specifically intended to help LBNL identify opportunities for program improvement. This report includes the results of the Division ES&H Self-Assessment, ES&H Technical Assurance Program Assessment, and Division ES&H Peer Review, respectively.« less
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Annual Report Fiscal Year 1980--Office of Technical Assistance and Training.
ERIC Educational Resources Information Center
Bureau of Indian Affairs, Brigham City, UT.
The technical assistance and training services which the Office of Technical Assistance and Training (OTAT) offered for Alaskan Natives, Indian Tribes, and the Bureau of Indian Affairs personnel during 1980 are highlighted in this report. The Real Property Management and the Forestry training programs, developed in cooperation with the Office of…
Urban Rail Supporting Technology Program Fiscal Year 1975 - Year End Summary
DOT National Transportation Integrated Search
1975-12-01
The Urban Rail Supporting Technology Program is described for the 1975 fiscal year period. Important areas include program management, technical support and applications engineering, facilities development, test and evaluation, and technology develop...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This technical note describes the current capabilities and availability of the Automated Dredging and Disposal Alternatives Management System (ADDAMS). The technical note replaces the earlier Technical Note EEDP-06-12, which should be discarded. Planning, design, and management of dredging and dredged material disposal projects often require complex or tedious calculations or involve complex decision-making criteria. In addition, the evaluations often must be done for several disposal alternatives or disposal sites. ADDAMS is a personal computer (PC)-based system developed to assist in making such evaluations in a timely manner. ADDAMS contains a collection of computer programs (applications) designed to assist in managingmore » dredging projects. This technical note describes the system, currently available applications, mechanisms for acquiring and running the system, and provisions for revision and expansion.« less
Idaho National Laboratory Directed Research and Development FY-2009
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2010-03-01
The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefitmore » each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are appropriately handled. The LDRD Program is assessed annually for both output and process efficiency to ensure the investment is providing expected returns on technical capability enhancement. The call for proposals and project selection process for the INL LDRD program begins typically in April, with preliminary budget allocations, and submittal of the technical requests for preproposals. A call for preproposals is made at this time as well, and the preparation of full proposals follows in June and closes in July. The technical and management review follows this, and the portfolio is submitted for DOE-ID concurrence in early September. Project initiation is in early October. The technical review process is independent of, and in addition to the management review. These review processes are very stringent and comprehensive, ensuring technical viability and suitable technical risk are encompassed within each project that is selected for funding. Each proposal is reviewed by two or three anonymous technical peers, and the reviews are consolidated into a cohesive commentary of the overall research based on criteria published in the call for proposals. A grade is assigned to the technical review and the review comments and grade are released back to the principal investigators and the managers interested in funding the proposals. Management criteria are published in the call for proposals, and management comments and selection results are available for principal investigator and other interested management as appropriate. The DOE Idaho Operations Office performs a final review and concurs on each project prior to project authorization, and on major scope/budget changes should they occur during the project's implementation. This report begins with several research highlights that exemplify the diversity of scientific and engineering research performed at the INL in FY 2009. Progress summaries for all projects are organized into sections reflecting the major areas of research focus at the INL. These sections begin with the DOE-NE Nuclear Science and Technology mission support area, followed by the National and Homeland Security and the Energy and Environmental Science and Technology areas. The major INL initiatives and the INL's Distinctive Signatures areas complete the project summaries. The appendices provide information on project relevance to DOE missions and major national programs as well as an author index, list of refereed publications and index of key terms.« less
Strategic Plan for Information Systems and Technology, Fiscal Years 1994-1998.
ERIC Educational Resources Information Center
National Archives and Records Administration, Washington, DC.
The information systems and technology management program of the National Archives and Records Administration (NARA) establishes broad policy guidance and technical standards for information management to ensure that appropriate resource sharing can occur, while providing cost-effective support for mission requirements of program offices. The NARA…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-10
...) Removal for Commercial Users To Access Electronic Transportation Acquisition (ETA) AGENCY: Department of...: Submit comments to SDDC/G6/IMA/ES, 1 Soldier Way, Scott AFB, IL 62225 ATTN: ETA Program Manager. FOR FURTHER INFORMATION CONTACT: ETA Program Manager at [email protected] . Technical questions...
THE IMPORTANCE OF A SUCCESSFUL QUALITY ASSURANCE (QA) PROGRAM FROM A RESEARCH MANAGER'S PERSPECTIVE
The paper discusses the Air Pollution Prevention and Control Division's Quality Assurance (QA) program and the approaches used to meet QA requirements in the Division. The presentation is a technical manager's perspective of the Division's requirements for and approach to QA in i...
Building a Sustainable Project Management Capacity in Cyprus
ERIC Educational Resources Information Center
Kelly, Steven J.; Esque, Timm J.; Novak, M. Mari; Cermakova, Anna
2012-01-01
The performance-driven project management program examined in this article was funded to support a variety of technical assistance efforts designed to strengthen the performance of small and medium enterprises in the Turkish Cypriot community in Cyprus. The customized program combined progressive workshops with hands-on and distance coaching by…
15 CFR 923.126 - Pre-application procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Coastal Zone Enhancement Grants Program § 923.126 Pre... one or more of the coastal zone enhancement objectives. (8) If the sum of estimated project costs for...) The Assistant Administrator may seek advice from technical experts in the fields of the coastal zone...
ERIC Educational Resources Information Center
Moodie, Gavin; Wheelahan, Leesa; Billett, Stephen; Kelly, Ann
2009-01-01
A project funded through the National Vocational Education and Training Research and Evaluation program investigated higher education programs--mostly bachelor's and associate degrees--offered by technical and further education (TAFE) institutes. This overview highlights the implications for TAFE management identified through this project. [This…
SOFIA Program SE and I Lessons Learned
NASA Technical Reports Server (NTRS)
Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.
2011-01-01
Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.
Sediment Management Methods to Reduce Dredging: Part 2, Sediment Collector Technology
2017-04-01
Approved for public release; distribution is unlimited. ERDC TN-DOER-T13 April 2017 Sediment Management Methods to Reduce Dredging: Part 2...DOER) Program technical note (TN) is the second in a series evaluating sediment management methods to reduce dredging through a research task (RT...in the DOER Program.1 This TN presents an evaluation of sediment collector technology, one promising new device that may help better manage
Urban Rail Supporting Technology Program - Fiscal Year 1973 - Year-End Summary
DOT National Transportation Integrated Search
1974-01-01
The Urban Rail Supporting Technology Program, being conducted for the Department of Transportation Urban Mass Transportation Administration (UMTA) is described for the 1973 Fiscal Year period. Major areas covered include program management, technical...
7 CFR 1944.547 - Management assistance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 13 2013-01-01 2013-01-01 false Management assistance. 1944.547 Section 1944.547...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.547 Management assistance. The District Director will see that each TSA grantee receives management assistance to help...
7 CFR 1944.547 - Management assistance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 13 2012-01-01 2012-01-01 false Management assistance. 1944.547 Section 1944.547...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.547 Management assistance. The District Director will see that each TSA grantee receives management assistance to help...
7 CFR 1944.547 - Management assistance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 13 2014-01-01 2013-01-01 true Management assistance. 1944.547 Section 1944.547...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.547 Management assistance. The District Director will see that each TSA grantee receives management assistance to help...
7 CFR 1944.547 - Management assistance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 13 2011-01-01 2009-01-01 true Management assistance. 1944.547 Section 1944.547...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.547 Management assistance. The District Director will see that each TSA grantee receives management assistance to help...
A Model for the Management of Technical Risk in New Technology Development Programs
1989-09-01
Heppenheimer , T. A . "Requiem for a Heavy-weight," Air and Snace/Smithsonian, 4: 50-55-- June/July 1989). 91. Jane’s Information Group, Inc. Jane’s...8217-- A MODEL FOR THE MANAGEMENT OF TECHNICAL RISK IN NEW TECHNOLOGY DEVELOPMENT PROGRAMS THESIS Peter B. King Captain, USA~F A FIT /G SM /L SR /89...S-22 1 DISI~1UT0N TAEMEN A , S’o11 _44110h, eea;EL ECTE EApproVed 0 ulcrl~;DC2 0 1989 Dis-,irbuticf Unlimited D DEPARTMENT OF THE AIR FORCE-- - AIR
1987-06-01
in chlorine contact chambers were not sensit ive to experimentil procedure, and ’"When the dye test was repeated on the same hsin undcr ident i ; I I...neither YA t 1idth nor Ienzth ar’ 1n t -r,1ined i u , nd i t ion, costs are , iunti , t ion I .< and N . ( u yen % and Iltl ;I<,, r[i,. hte used tc com...DREDGING OPERATIONS TECHNICAL SUPPORT PROGRAM TEHIA REPORT D-87-2 DESIGN AND MANAGEMENT OF DREDGED MATERIAL CONTAINMENT AREAS TO% N IMPROVE
Spacelab: An International Success Story
NASA Technical Reports Server (NTRS)
Lord, Douglas R.
1987-01-01
Spacelab is a European-developed and U.S.-operated space laboratory carried in the cargo bay of the Space Shuttle Orbiter. This story of the Spacelab Development Program traces the program from the origin of the Spacelab concept, describing negotiations and agreements for European participation and the role of Europe and the United States in system development, operational capability development, and utilization planning. It also considers the joint management structure, coordination, and experience in solving management and technical interface problems. The book is not an exhaustive historical treatise, but an informative and readable story of the evolution and technical accomplishments of this unique program in manned space flight and of some of the unusual political and human interest aspects of the program from the viewpoint of one of the key participants.
ERIC Educational Resources Information Center
Gardner, David C.; And Others
Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…
ERIC Educational Resources Information Center
Valle, Victor M.
The success of development programs in educational systems is dependent, to a large extent, on the quality and relevancy of their management. Many worthwhile, well conceived and planned educational reforms have failed due to poor management. Therefore, both ministries of education and international organizations of technical cooperation have…
Risk-Informed Decision Making: Application to Technology Development Alternative Selection
NASA Technical Reports Server (NTRS)
Dezfuli, Homayoon; Maggio, Gaspare; Everett, Christopher
2010-01-01
NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.
How to manage without being a manager
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sweeney, M.A.
1997-06-01
In the author`s current position at Sandia National Laboratories within the Pulsed Power Sciences Center, much of the author`s time is spent in composing short (one page) technical reports and long (> 20 page) technical contracts and program plans for transmission to the Department of Energy and to upper management and also in reviewing long technical documents for accuracy. A major requirement of these efforts is to complete them on a timely basis, often within a few hours or a few days. In this talk, the author reveals some communication {open_quotes}secrets{close_quotes} that have been learned. The idea behind these twelvemore » {open_quotes}secrets{close_quotes} is to get the answers you, as a nonmanager, need quickly from a manager without creating stress either on your part or the manager`s part.« less
2014-08-05
The Assistant Secretary for the Office of Special Education and Rehabilitative Services (OSERS) announces a priority under the Technical Assistance on State Data Collection program. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to fund a cooperative agreement to establish and operate an IDEA Data Management Center (Center) that will provide technical assistance (TA) to improve the capacity of States to meet the data collection requirements of the Individuals with Disabilities Education Act (IDEA).
78 FR 41812 - Office of the Secretary of Transportation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
... portfolio. 3. Provide a minimum of 20 hours of individual or group counseling sessions to small businesses... technical assistance, business training programs, business assessment, management training, counseling... activities such as information dissemination, small business counseling, and technical assistance with small...
7 CFR 2003.26 - Functional organization of RBS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... on cooperative marketing. The division conducts research and analysis and gives technical assistance... cooperative resource management. The division conducts research and analysis and gives technical assistance to... service to cooperative associations by administering a program of research and analysis of economic...
Weatherization Assistance Program Technical Assistance Center
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Adams
2009-01-07
The following is a synopsis of the major achievements attributed to the operation of the Weatherization Assistance Program Technical Assistance Center (WAPTAC) by the National Association for State Community Services Programs (NASCSP). During the past five years, the WAPTAC has developed into the premier source for information related to operating the Weatherization Assistance Program (WAP) at the state and local levels. The services provide through WAPTAC include both virtual technical support as well as hands-on training and instruction in classroom and in the field. The WAPTAC achieved several important milestones during its operation including the establishment of a national Weatherizationmore » Day now celebrated in most states, the implementation of a comprehensive Public Information Campaign (PIC) to raise the awareness of the Program among policy makers and the public, the training of more than 150 new state managers and staff as they assume their duties in state offices around the country, and the creation and support of a major virtual information source on the Internet being accessed by thousands of staff each month. The Weatherization Assistance Program Technical Assistance Center serves the Department of Energy's (DOE) Office of Weatherization and Intergovernmental Program as a valuable training and technical assistance resource for the network of 54 direct state grantees (50 states, District of Columbia and three Native American tribes) and the network of 900 local subgrantees (comprised of community action agencies, units of local government, and other non-profit organizations). The services provided through WAPTAC focus on standardizing and improving the daily management of the WAP. Staff continually identify policies changes and best practices to help the network improve its effectiveness and enhance the benefits of the Program for the customers who receive service and the federal and private investors. The operations of WAPTAC are separated into six distinct areas: (1) Orientation for New WAP State Directors and Staff; (2) Pollution Occurrence Insurance Project; (3) Public Information Campaign; (4) State Management Training Project; (5) System for Integrating and Reviewing Technologies and Techniques; and (6) WAPTAC Services.« less
Photo of Neil Snyder Neil Snyder Manager III-Program Management Research Neil.Snyder@nrel.gov management. He has chiefly focused on developing complex systems and his specific expertise is leadership. As has acquired familiarity level expertise in many technical fields including environmental management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bissani, M; Fischer, R; Kidd, S
2006-04-03
The primary goal of this visit was to perform a joint assessment of the Renewable Energy and Water Desalination Center's (REWDC) program in radioactive waste management. The visit represented the fourth technical and scientific interaction with Libya under the DOE/NNSA Sister Laboratory Arrangement. Specific topics addressed during the visit focused on Action Sheet P-05-5, ''Radioactive Waste Management''. The Team, comprised of Mo Bissani (Team Lead), Robert Fischer, Scott Kidd, and Jim Merrigan, consulted with REWDC management and staff. The team collected information, discussed particulars of the technical collaboration and toured the Tajura facility. The tour included the waste treatment facility,more » waste storage/disposal facility, research reactor facility, hot cells and analytical labs. The assessment team conducted the first phase of Task A for Action Sheet 5, which involved a joint assessment of the Radioactive Waste Management Program. The assessment included review of the facilities dedicated to the management of radioactive waste at the Tourja site, the waste management practices, proposed projects for the facility and potential impacts on waste generation and management.« less
Jaffré, Yannick; Suh, Siri
2016-05-01
Despite impressive global investment in reproductive health programs in West Africa, maternal mortality remains unacceptably high and obstetric care is often inadequate. Fertility is among the highest in the world, while contraceptive prevalence remains among the lowest. This paper explores the social and technical dimensions of this situation. We argue that effective reproductive health programs require analyzing the interfaces between technical programs and the social logics and behaviors of health professionals and client populations. Significant gaps between health programs' goals and the behaviors of patients and health care professionals have been observed. While public health projects aim to manage reproduction, sexuality, fertility, and professional practices are regulated socially. Such projects may target technical practices, but access to care is greatly influenced by social norms and ethics. This paper shows how an empirical anthropology that investigates the social and technical interfaces of reproduction can contribute to improved global health. Copyright © 2016 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Chambers, Jay G.; Parrish, Thomas B.
The Resource Cost Model (RCM) is a resource management system that combines the technical advantages of sophisticated computer simulation software with the practical benefits of group decision making to provide detailed information about educational program costs. The first section of this document introduces the conceptual framework underlying…
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
Answering the Call of the Wild
ERIC Educational Resources Information Center
Zaiglin, Robert
2006-01-01
In order to become a professional wildlife manager, one must make several choices in order to reach their objectives. The first choice is to select a college that has a wildlife management program in place. For those interested in a two-year technical program, Southwest Texas Junior College is offering an applied science degree in wildlife…
Model Adoption Exchange Payment System: Technical Specifications and User Instructions.
ERIC Educational Resources Information Center
Ambrosino, Robert J.
This user's manual, designed to meet the needs of adoption exchange administrators and program managers for a formal tool to assist them in the overall management and operation of their program, presents the Model Adoption Exchange Payment System (MAEPS), which was developed to improve the delivery of adoption exchange services throughout the…
Ohio Financial Services and Risk Management. Technical Competency Profile (TCP).
ERIC Educational Resources Information Center
Ray, Gayl M.; Wilson, Nick; Mangini, Rick
This document describes the essential competencies from secondary through post-secondary associate degree programs for a career in financial services and risk management. Ohio College Tech Prep Program standards are described, and a key to profile codes is provided. Sample occupations in this career area, such as financial accountant, loan…
Parent Managed Day Care. Indian-Style.
ERIC Educational Resources Information Center
Taylor, Helen L. Sally
The efforts of a group of Quinault parents and the Early Childhood Education program of Edmonds College resulted in the establishment of a quality child care program which is parent managed, relevant to the community, and able to meet state requirements for day care. Funded by a Technical Assistance Contract and administered by Alaska Federated…
40 CFR 63.95 - Additional approval criteria for accidental release prevention programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... basis. (3) Procedures for reviewing risk management plans and providing technical assistance to... chapter; and (ii) A requirement that any source subject to the State's part 68 program submit a Risk Management Plan (RMP) that reports at least the same information in the same format as required under part 68...
NASA management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Peters, F.
1975-01-01
The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.
The Role of Leadership in Navy Program Offices. Executive Summary
1973-05-01
PROGRAM MANAGEMENT COURSE- SSTUDENT STUDY PROGRAM Fort Beivoir, Virginia, 22060 THE ROLE OF LEADERSHIP IN NAVY PROGRAM OFFICES STUDY REPORT PMC 73-1...jLa I1 • 1. Men at the Top. Osborne kLliott 1 2. "Understanding Leadership ". W. 0. H. Prentice, HBR Sep- Oct 1966 j 3. "A Theory of Human Motivation...Drucker, IMI reprint 9. Technical Management Institute Thifnkpiece, " Leadership " 1 • 0. "The Effective Manager ". Peter Drucker, LMI r~print 11. Sur-ival In
7 CFR 1944.547 - Management assistance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Management assistance. 1944.547 Section 1944.547 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...) PROGRAM REGULATIONS (CONTINUED) HOUSING Technical and Supervisory Assistance Grants § 1944.547 Management...
Seven Key Principles of Program and Project Success: A Best Practices Survey
NASA Technical Reports Server (NTRS)
Bilardo, Vincent J.; Korte, John J.; Dankhoff, Walter; Langan, Kevin; Branscome, Darrell R.; Fragola, Joseph R.; Dugal, Dale J.; Gormley, Thomas J.; Hammond, Walter E.; Hollopeter, James J.;
2008-01-01
The National Aeronautics and Space Administration (NASA) Organization Design Team (ODT), consisting of 20 seasoned program and project managers and systems engineers from a broad spectrum of the aerospace industry, academia, and government, was formed to support the Next Generation Launch Technology (NGLT) Program and the Constellation Systems Program. The purpose of the ODT was to investigate organizational factors that can lead to success or failure of complex government programs, and to identify tools and methods for the design, modeling, and analysis of new and more-efficient program and project organizations. The ODT conducted a series of workshops featuring invited lectures from seasoned program and project managers representing 25 significant technical programs spanning 50 years of experience. The result was the identification of seven key principles of program success that can be used to help design and operate future program organizations. This paper presents the success principles and examples of best practices that can significantly improve the design of program, project, and performing technical line organizations, the assessment of workforce needs and organization performance, and the execution of programs and projects.
[The Engineering and Technical Services Directorate at the Glenn Research Center
NASA Technical Reports Server (NTRS)
Moon, James
2004-01-01
My name is James Moon and I am a senior at Tennessee State University where my major is Aeronautical and Industrial Technology with a concentration in industrial electronics. I am currently serving my internship in the Engineering and Technical Services Directorate at the Glenn Research Center (GRC). The Engineering and Technical Service Directorate provides the services and infrastructure for the Glenn Research Center to take research concepts to reality. They provide a full range of integrated services including engineering, advanced prototyping and testing, facility management, and information technology for NASA, industry, and academia. Engineering and Technical Services contains the core knowledge in Information Technology (IT). This includes data systems and analysis, inter and intranet based systems design and data security. Including the design and development of embedded real-time s o h a r e applications for flight and supporting ground systems, Engineering and Technical Services provide a wide range of IT services and products specific to the Glenn Research Center research and engineering community. In the 7000 Directorate I work directly in the 7611 organization. This organization is known as the Aviation Environments Technical Branch. My mentor is Vincent Satterwhite who is also the Branch Chief of the Aviation Environments Technical Branch. In this branch, I serve as the Assistant program manager of the Engineering Technology Program. The Engineering Technology Program (ETP) is one of three components of the High School L.E.R.C.I.P. This is an Agency-sponsored, eight-week research-based apprenticeship program designed to attract traditionally underrepresented high school students that demonstrate an aptitude for and interest in mathematics, science, engineering, and technology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P. T.; Webb, J. R.; Knox, N. P.
The 664 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the twelfth in a series of reports prepared annually for the US Department of Energy Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy Remedial Action Programs. Major sections are (1) Decontamination and Decommissioning Program, (2) Nuclear Facilities Decommissioning, (3)more » Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and key word. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects, analyzes, and disseminates information on environmental restoration and remedial actions. RAPIC staff and resources are available to meet a variety of information needs. Contact the center at FTS 624-7764 or (615) 574-7764.« less
A Technical History of the SEI
2017-01-01
service-oriented architecture concepts by leading a team of technical ex - perts from several Air Force financial management programs of record in...the application of computing, that trend re- versed dramatically in the 1970s for a variety of reasons, including the difficulty the DoD was ex ...implement it in programming languages other than Ada. The lessons learned from the testbed ex - periments were incorporated into a comprehensive guide
Actionable Science in the Gulf of Mexico: Connecting Researchers and Resource Managers
NASA Astrophysics Data System (ADS)
Lartigue, J.; Parker, F.; Allee, R.; Young, C.
2017-12-01
The National Oceanic and Atmospheric Administration (NOAA) RESTORE Science Program was established in the wake of the Deepwater Horizon oil spill to to carry out research, observation, and monitoring to support the long-term sustainability of the Gulf of Mexico ecosystem, including its fisheries. Administered in partnership with the US Fish and Wildlife Service, the Science Program emphasizes a connection between science and decision-making. This emphasis translated into an engagement process that allowed for resource managers and other users of information about the ecosystem to provide direct input into the science plan for the program. In developing funding opportunities, the Science Program uses structured conversations with resource managers and other decision makers to focus competitions on specific end user needs. When evaluating proposals for funding, the Science Program uses criteria that focus on applicability of a project's findings and products, end user involvement in project planning, and the approach for transferring findings and products to the end user. By including resource managers alongside scientific experts on its review panels, the Science Program ensures that these criteria are assessed from both the researcher and end user perspectives. Once funding decisions are made, the Science Program assigns a technical monitor to each award to assist with identifying and engaging end users. Sharing of best practices among the technical monitors has provided the Science Program insight on how best to bridge the gap between research and resource management and how to build successful scientist-decision maker partnerships. During the presentation, we will share two case studies: 1) design of a cooperative (fisheries scientist, fisheries managers, and fishers), Gulf-wide conservation and monitoring program for fish spawning aggregations and 2) development of habitat-specific ecosystem indicators for use by federal and state resource managers.
Atomic- and Device-Scale Physics of Ion-Transport Memristors
2017-02-02
ASSIGNED DISTRIBUTION STATEMENT. //SIGNED// //SIGNED// ARTHUR EDWARDS DAVID CARDIMONA Program Manager Technical Advisor, Space Based Advanced...in the interest of scientific and technical information exchange, and its publication does not constitute the Government’s approval or disapproval...is available to the general public, including foreign nationals. Copies may be obtained from the Defense Technical Information Center (DTIC) (http://www.dtic.mil).
ERIC Educational Resources Information Center
Norwich Regional Vocational Technical School, CT.
Responding to a Small Business Administration statement that technical school graduates lack knowledge of business principles, the Norwich (Connecticut) Regional Vocational Technical School conducted a course in small business ownership/management for all of its seniors. The required course, a fifty-four-hour module, replaced one English,…
ECOSYSTEM RESTORATION RESEARCH THROUGH THE NATIONAL RISK MANAGEMENT RESEARCH LABORATORY (NRMRL)
The Ecosystem Restoration Research Program underway through ORD's National Risk Management Research Laboratory (NRMRL) has the long-term goal of providing watershed managers with "..state-of-the-science field-evaluated tools, technical guidance, and decision-support systems for s...
Site Characterization and Monitoring Technical Support Center FY16 Report
SCMTSC’s primary goal is to provide technical assistance to regional programs on complex hazardous waste site characterization issues. This annual report illustrates the range and extent of projects that SCMTSC supported in FY 2016. Our principal audiences are site project manage...
Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan
NASA Technical Reports Server (NTRS)
1974-01-01
The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.
41 CFR 102-192.130 - What are your general responsibilities as an agency mail manager?
Code of Federal Regulations, 2012 CFR
2012-01-01
... as a Contracting Officer's Technical Representative), other agency mail managers, and the GSA Office... responsibilities as an agency mail manager? 102-192.130 Section 102-192.130 Public Contracts and Property... ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Agency Mail Manager Requirements § 102-192.130 What are your general...
41 CFR 102-192.130 - What are your general responsibilities as an agency mail manager?
Code of Federal Regulations, 2013 CFR
2013-07-01
... as a Contracting Officer's Technical Representative), other agency mail managers, and the GSA Office... responsibilities as an agency mail manager? 102-192.130 Section 102-192.130 Public Contracts and Property... ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Agency Mail Manager Requirements § 102-192.130 What are your general...
41 CFR 102-192.130 - What are your general responsibilities as an agency mail manager?
Code of Federal Regulations, 2011 CFR
2011-01-01
... as a Contracting Officer's Technical Representative), other agency mail managers, and the GSA Office... responsibilities as an agency mail manager? 102-192.130 Section 102-192.130 Public Contracts and Property... ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Agency Mail Manager Requirements § 102-192.130 What are your general...
41 CFR 102-192.130 - What are your general responsibilities as an agency mail manager?
Code of Federal Regulations, 2014 CFR
2014-01-01
... as a Contracting Officer's Technical Representative), other agency mail managers, and the GSA Office... responsibilities as an agency mail manager? 102-192.130 Section 102-192.130 Public Contracts and Property... ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT Agency Mail Manager Requirements § 102-192.130 What are your general...
NASA Technical Reports Server (NTRS)
Baldwin, Evelyn
2008-01-01
The Johnson Space Center s (JSC) International Space Station (ISS) Space Flight Resource Management (SFRM) training program is designed to teach the team skills required to be an effective flight controller. It was adapted from the SFRM training given to Shuttle flight controllers to fit the needs of a "24 hours a day/365 days a year" flight controller. More recently, the length reduction of technical training flows for ISS flight controllers impacted the number of opportunities for fully integrated team scenario based training, where most SFRM training occurred. Thus, the ISS SFRM training program is evolving yet again, using a new approach of teaching and evaluating SFRM alongside of technical materials. Because there are very few models in other industries that have successfully tied team and technical skills together, challenges are arising. Despite this, the Mission Operations Directorate of NASA s JSC is committed to implementing this integrated training approach because of the anticipated benefits.
78 FR 56132 - Human Reliability Program: Technical Amendments
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-12
....'' In addition, the definition of ``Manager'' in the current rule does not reflect recent changes within...'' authorities, but are not listed in the definition of ``Manager.'' DOE has decided to substitute the following definition of ``Manager'' for the current listing in Sec. 712.3: ``Manager means the senior Federal line...
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
Consistent Criteria are Needed to Assess Small-Business Innovation Initiatives.
1981-07-07
Federal programs designed to provide funding or technical and management assistance directly to small busi - nesses (such as the National Science...activities to support small businesses as innovators 33 Efforts to influence economy-wide factors 35 Programs that provide funding or management and... Management : A Guide to Entrepreneurship (Boston: Houghton Mifflin, 1977), p. 61. 2/H. Stoll and J. Walter, Tax Incentives for Small Businesses (Chicago
ERIC Educational Resources Information Center
Puma, Michael J.; Ellis, Richard
Part of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant programs reports on the design of the site visit component of the study and the results of the student survey, both in terms of the yield obtained and the quality of the data. Chapter 2 describes the design of sampling methodology employed…
Human Systems Integration in Practice: Constellation Lessons Learned
NASA Technical Reports Server (NTRS)
Zumbado, Jennifer Rochlis
2012-01-01
NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.
ERIC Educational Resources Information Center
Bruce, Lady Anne; Chandler, Mark; Nichols, Raynette; Nevill, Becky
2005-01-01
Secondary vocational-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…
ERIC Educational Resources Information Center
Research for Better Schools, Inc., Philadelphia, PA.
Based on the assumption that educational research and development (R&D) requires the same technical managerial skills as any other business organization, this survey examined fifty management training programs for women and/or minorities in eighteen business, academic, and industrial settings. Information gathered on courses, workshops, and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deeb, Rula A.; Hawley, Elisabeth L.
The goal of United States (U.S.) Department of Energy's (DOE)'s environmental remediation programs is to restore groundwater to beneficial use, similar to many other Federal and state environmental cleanup programs. Based on past experience, groundwater remediation to pre-contamination conditions (i.e., drinking water standards or non-detectable concentrations) can be successfully achieved at many sites. At a subset of the most complex sites, however, complete restoration is not likely achievable within the next 50 to 100 years using today's technology. This presentation describes several approaches used at complex sites in the face of these technical challenges. Many complex sites adopted a long-termmore » management approach, whereby contamination was contained within a specified area using active or passive remediation techniques. Consistent with the requirements of their respective environmental cleanup programs, several complex sites selected land use restrictions and used risk management approaches to accordingly adopt alternative cleanup goals (alternative endpoints). Several sites used long-term management designations and approaches in conjunction with the alternative endpoints. Examples include various state designations for groundwater management zones, technical impracticability (TI) waivers or greater risk waivers at Superfund sites, and the use of Monitored Natural Attenuation (MNA) or other passive long-term management approaches over long time frames. This presentation will focus on findings, statistics, and case studies from a recently-completed report for the Department of Defense's Environmental Security Technology Certification Program (ESTCP) (Project ER-0832) on alternative endpoints and approaches for groundwater remediation at complex sites under a variety of Federal and state cleanup programs. The primary objective of the project was to provide environmental managers and regulators with tools, metrics, and information needed to evaluate alternative endpoints for groundwater remediation at complex sites. A statistical analysis of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) sites receiving TI waivers will be presented as well as case studies of other types of alternative endpoints and alternative remedial strategies that illustrate the variety of approaches used at complex sites and the technical analyses used to predict and document cost, time frame, and potential remedial effectiveness. This presentation is intended to inform DOE program managers, state regulators, practitioners and other stakeholders who are evaluating technical cleanup challenges within their own programs, and establishing programmatic approaches to evaluating and implementing long-term management approaches. Case studies provide examples of long-term management designations and strategies to manage and remediate groundwater at complex sites. At least 13 states consider some designation for groundwater containment in their corrective action policies, such as groundwater management zones, containment zones, and groundwater classification exemption areas. Long-term management designations are not a way to 'do nothing' or walk away from a site. Instead, soil and groundwater within the zone is managed to be protective of human health and the environment. Understanding when and how to adopt a long-term management approach can lead to cost savings and the more efficient use of resources across DOE and at numerous other industrial and military sites across the U.S. This presentation provides context for assessing the use and appropriate role of alternative endpoints and supporting long-term management designations in final remedies. (authors)« less
Overviews of the Apollo Program and Its Management
NASA Technical Reports Server (NTRS)
2004-01-01
This special bibliography includes items individually selected by scientific and technical information professionals that provide an overview of the history, events, and results of the Apollo missions. Planning, scheduling, and management are also included.
This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.
A new generation of real-time DOS technology for mission-oriented system integration and operation
NASA Technical Reports Server (NTRS)
Jensen, E. Douglas
1988-01-01
Information is given on system integration and operation (SIO) requirements and a new generation of technical approaches for SIO. Real-time, distribution, survivability, and adaptability requirements and technical approaches are covered. An Alpha operating system program management overview is outlined.
Common Standards for Career Education Programs
ERIC Educational Resources Information Center
Missouri Department of Elementary and Secondary Education, 2012
2012-01-01
The Office of College and Career Readiness has developed the "Common Standards for Career Education Programs." The six common standards are: (1) Program Management and Planning; (2) Curriculum; (3) Instruction; (4) Professional Development; (5) Career and Technical Student Organizations; and (6) Instructional Facilities and Equipment.…
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, J.P.
1991-01-01
This paper reports that science education has long been a critical element in the U.S. Department of Energy's (DOE) Civilian Radioactive Waste Management Program. OCRWM has developed educational programs aimed at improving the science literacy of students from kindergarten through college and post-graduate levels, enhancing the skills of teachers, encouraging careers in science and engineering, and developing a keener awareness of science issues among the general population. Activities include interaction with educators in the development of curricula material; workshops for elementary and secondary students; cooperative agreements and projects with universities; OCRWM exhibit showings at technical and non-technical meetings and atmore » national and regional teacher/educator conferences; the OCRWM Fellowship Program; and support for Historically Black Colleges and Universities.« less
Technical Support for Contaminated Sites | Science Inventory ...
In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled ORD to provide effective technical assistance by ensuring ORD scientists and engineers were accessible to the Agency’s Office and Regional decision makers, including Remedial Project Managers, On-Scene Coordinators, and corrective action staff. Five ORD Technical Support Centers (TSCs) were created to facilitate this technical assistance. Three of the five TSCs are supported by the Sustainable and Healthy Communities Research Program, and are summarized in the poster being presented:• Engineering Technical Support Center (ETSC) in Cincinnati, Ohio• Ground Water Technical Support Center (GWTSC) in Ada, Oklahoma• Site Characterization and Monitoring Technical Support Center (SCMTSC) in Atlanta, GeorgiaOver the past 29 years, the Technical Support Centers have provided numerous influential products to its internal Agency clients and to those at the State level (through the EPA Regions). These products include, but are not limited to the following: Annual TSC reports from the three Centers, a hard-rock mining conference every other year, PRO-UCL software development for site characterization statistics, groundwater modeling using state-of-the-art modeling software, numerical mo
Bridging the Divide between Safety and Risk Management for your Project or Program
NASA Technical Reports Server (NTRS)
Lutomski, Mike
2005-01-01
This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Evaluation of simparteam - a needs-orientated team training format for obstetrics and neonatology.
Zech, Alexandra; Gross, Benedict; Jasper-Birzele, Céline; Jeschke, Katharina; Kieber, Thomas; Lauterberg, Jörg; Lazarovici, Marc; Prückner, Stephan; Rall, Marcus; Reddersen, Silke; Sandmeyer, Benedikt; Scholz, Christoph; Stricker, Eric; Urban, Bert; Zobel, Astrid; Singer, Ingeborg
2017-04-01
A standardized team-training program for healthcare professionals in obstetric units was developed based on an analysis of common causes for adverse events found in claims registries. The interdisciplinary and inter-professional training concept included both technical and non-technical skill training. Evaluation of the program was carried out in hospitals with respect to the immediate personal learning of participants and also regarding changes in safety culture. Trainings in n=7 hospitals including n=270 participants was evaluated using questionnaires. These were administered at four points in time to staff from participating obstetric units: (1) 10 days ahead of the training (n=308), (2) on training day before (n=239), (3) right after training (n=248), and (4) 6 months after (n=188) the intervention. Questionnaires included several questions for technical and non-technical skills and the Hospital Survey on Patient Safety (HSOPS). Strong effects were found in the participants' perception of their own competence regarding technical skills and handling of emergencies. Small effects could be observed in the scales of the HSOPS questionnaire. Most effects differed depending on professional groups and hospitals. Integrated technical and team management training can raise employees' confidence with complex emergency management skills and processes. Some indications for improvements on the patient safety culture level were detected. Furthermore, differences between professional groups and hospitals were found, indicating the need for more research on contributing factors for patient safety and for the success of crew resource management (CRM) trainings.
Environmental Management in Mainland China.
ERIC Educational Resources Information Center
Shen, Thomas T.
1984-01-01
Provides an overview of China's environmental pollution management by discussing: China's Environmental Protection Organization; laws and regulations; environmental protection program; education and manpower training; and research into environmental pollution problems. (The author provided technical assistance to China's environmental pollution…
Kanawha River Basin Water Quality Modeling
1986-07-01
was performed by Mr. R. G. Willey with the technical assistance of Mr. Keith Knight. Mr. Don Smith of Resource Management Associates provided advice...during critical parts of the study. The study was managed under the direcLion of Dr. Richard Punnett of the Huntington District who was also responsible...to provide better system water quality analysis capabilities in support of the Corps’ water control management program. The focus of this program is
Bill Williams; Tracey S. Frescino; Larry T. DeBlander; Sharon W. Woudenberg; Michael Wilson
2006-01-01
The Bureau of Land Management (BLM) does not have a consistent internal program or source of vegetation data to use for strategic level planning, such as in resource management plans. This technical note discusses and evaluates the potential of the USDA Forest Service Forest Inventory and Analysis (FIA) Program to assist the BLM in filling this data gap. The FIA...
ERIC Educational Resources Information Center
Thomas, Charles R.
This document is one of the 5 sections of the Data Element Dictionary developed as part of the WICHE Management Information Systems (MIS) Program. The elements in this section apply to both the current and historical data concerning finance. The purpose of the WICHE MIS Program is to make it possible to derive data which will be truly comparable…
Region 9 Tribal Clean Water Act Programs and Grants
EPA's Tribal Water Office in Region 9 manages all grants related to the Clean Water Act for over 100 federally recognized tribes and provides programmatic and technical assistance for water quality standards and CWA grant programs.
Continuing Education -- A Management Point of View.
ERIC Educational Resources Information Center
Williams, J. D.
The needs for continuing engineering education to avoid technical obsolescence and the programs offered by one company to fill this need are discussed. Ten educational alternative programs of the Sandia Laboratories, Albuquerque (New Mexico) are described. (CP)
NASA Technical Reports Server (NTRS)
1973-01-01
Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.
US forest service technical cooperation visit Badia Rangeland and irrigation analysis
USDA-ARS?s Scientific Manuscript database
A US Forest Service (USFS) team comprised of a rangeland management advisor, a dryland water resource, and irrigation specialist, and a Middle East program specialist visited Jordan to provide technical assistance to the Ministry of Agriculture-Water Harvesting Directorate (MoA) and the Hashemite Fu...
44 CFR 65.15 - List of communities submitting new technical data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false List of communities... Program IDENTIFICATION AND MAPPING OF SPECIAL HAZARD AREAS § 65.15 List of communities submitting new technical data. This section provides a cumulative list of communities where modifications of the base flood...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
... hours of individual or group counseling sessions to small businesses per month. (D) Planning Committee 1..., such as, business assessment, management training, counseling, technical assistance, marketing and... counseling, and technical assistance with small businesses currently doing business with public and private...
Teaching Graduate Business Students to Write Clearly about Technical Topics
ERIC Educational Resources Information Center
Dyrud, Marilyn A.; Worley, Rebecca B.; Jameson, Daphne
2006-01-01
Graduate programs in business emphasize technical analysis in finance, accounting, marketing, and other core courses. Important business decisions--what market to target, which products to offer, how to finance an acquisition, whether to lease or buy equipment--require mathematical and statistical problem solving. Management communication courses…
Achieving Adaptability through Inquiry Based Learning
2010-06-01
BLACK, Ph.D. MICHELLE SAMS, Ph.D. Research Program Manager Director Training and Leader Development Division Technical review by Marisa...Learning 5a. CONTRACT OR GRANT NUMBER 5b. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) Thomas M. Duffy (Indiana University) and Pamela...ORGANIZATION NAME( S ) AND ADDRESS(ES) School of Education Army Management Staff College Indiana University 5500 21st Street 201
NASA Technical Reports Server (NTRS)
1973-01-01
Results of the design and manufacturing reviews on the maturity of the Skylab modules are presented along with results of investigations on the scope of the cluster risk assessment efforts. The technical management system and its capability to assess and resolve problems are studied.
2017-05-23
We experienced some technical issues during our live stream of Behind The Scenes at NASA’s Kennedy Space Center. In case you missed it, please enjoy the show with Director Bob Cabana, and an exclusive tour inside the Vehicle Assembly Building (VAB) with Ground Systems Development Office (GSDO) Associate Program Manager Shawn Quinn
Manual of Accreditation Standards for Adventure Programs 1995.
ERIC Educational Resources Information Center
Williamson, John E., Comp.; Gass, Michael, Comp.
This manual presents standards for adventure education programs seeking accreditation from the Association for Experiential Education. The manual is set up sequentially, focusing both on objective standards such as technical risk management aspects, and on subjective standards such as teaching approaches used in programs. Chapter titles provide…
Student War Loans Program: Final Report. Bulletin, 1946, No. 14
ERIC Educational Resources Information Center
Flynt, R. C. M.
1946-01-01
The Student War Loans Program, officially "Loans to Students in Technical and Professional Fields (National Defense)," was one of five essential wartime programs administered by the U. S. Office of Education. The Division of Higher Education administered two of these programs, namely, the Engineering, Science and Management War Training Program…
The Apollo Experience Lessons Learned for Constellation Lunar Dust Management
NASA Technical Reports Server (NTRS)
Wagner, Sandra
2008-01-01
In 2008, NASA was embarking on its Exploration Vision, knowing that many technical challenges would be encountered. For lunar exploration missions, one challenge was to learn to manage lunar dust. References to problems associated with lunar dust during the Apollo Program were found on many of pages of the mission reports and technical debriefs. All engineers designing hardware that would come into contact with lunar dust had to mitigate its effects in the design.
Assessing the quality of cost management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fayne, V.; McAllister, A.; Weiner, S.B.
1995-12-31
Managing environmental programs can be effective only when good cost and cost-related management practices are developed and implemented. The Department of Energy`s Office of Environmental Management (EM), recognizing this key role of cost management, initiated several cost and cost-related management activities including the Cost Quality Management (CQM) Program. The CQM Program includes an assessment activity, Cost Quality Management Assessments (CQMAs), and a technical assistance effort to improve program/project cost effectiveness. CQMAs provide a tool for establishing a baseline of cost-management practices and for measuring improvement in those practices. The result of the CQMA program is an organization that has anmore » increasing cost-consciousness, improved cost-management skills and abilities, and a commitment to respond to the public`s concerns for both a safe environment and prudent budget outlays. The CQMA program is part of the foundation of quality management practices in DOE. The CQMA process has contributed to better cost and cost-related management practices by providing measurements and feedback; defining the components of a quality cost-management system; and helping sites develop/improve specific cost-management techniques and methods.« less
Training and Maintaining System-Wide Reliability in Outcome Management.
Barwick, Melanie A; Urajnik, Diana J; Moore, Julia E
2014-01-01
The Child and Adolescent Functional Assessment Scale (CAFAS) is widely used for outcome management, for providing real time client and program level data, and the monitoring of evidence-based practices. Methods of reliability training and the assessment of rater drift are critical for service decision-making within organizations and systems of care. We assessed two approaches for CAFAS training: external technical assistance and internal technical assistance. To this end, we sampled 315 practitioners trained by external technical assistance approach from 2,344 Ontario practitioners who had achieved reliability on the CAFAS. To assess the internal technical assistance approach as a reliable alternative training method, 140 practitioners trained internally were selected from the same pool of certified raters. Reliabilities were high for both practitioners trained by external technical assistance and internal technical assistance approaches (.909-.995, .915-.997, respectively). 1 and 3-year estimates showed some drift on several scales. High and consistent reliabilities over time and training method has implications for CAFAS training of behavioral health care practitioners, and the maintenance of CAFAS as a global outcome management tool in systems of care.
Investigation of Fuel Oil/Lube Oil Spray Fires On Board Vessels. Volume 3.
1998-11-01
U.S. Coast Guard Research and Development Center 1082 Shennecossett Road, Groton, CT 06340-6096 Report No. CG-D-01-99, III Investigation of Fuel ...refinery). Developed the technical and mathematical specifications for BRAVO™2.0, a state-of-the-art Windows program for performing event tree and fault...tree analyses. Also managed the development of and prepared the technical specifications for QRA ROOTS™, a Windows program for storing, searching K-4
Energy Materials Coordinating Committee (EMaCC). Annual technical report, Fiscal Year 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2002-08-01
The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations.
NASA Risk Management Handbook. Version 1.0
NASA Technical Reports Server (NTRS)
Dezfuli, Homayoon; Benjamin, Allan; Everett, Christopher; Maggio, Gaspare; Stamatelatos, Michael; Youngblood, Robert; Guarro, Sergio; Rutledge, Peter; Sherrard, James; Smith, Curtis;
2011-01-01
The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \\Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.
NASA Technical Reports Server (NTRS)
Menrad, Robert J.; Larson, Wiley J.
2008-01-01
This paper shares the findings of NASA's Integrated Learning and Development Program (ILDP) in its effort to reinvigorate the HANDS-ON practice of space systems engineering and project/program management through focused coursework, training opportunities, on-the job learning and special assignments. Prior to March 2005, NASA responsibility for technical workforce development (the program/project manager, systems engineering, discipline engineering, discipline engineering and associated communities) was executed by two parallel organizations. In March 2005 these organizations merged. The resulting program-ILDP-was chartered to implement an integrated competency-based development model capable of enhancing NASA's technical workforce performance as they face the complex challenges of Earth science, space science, aeronautics and human spaceflight missions. Results developed in collaboration with NASA Field Centers are reported on. This work led to definition of the agency's first integrated technical workforce development model known as the Requisite Occupation Competence and Knowledge (the ROCK). Critical processes and products are presented including: 'validation' techniques to guide model development, the Design-A-CUrriculuM (DACUM) process, and creation of the agency's first systems engineering body-of-knowledge. Findings were validated via nine focus groups from industry and government, validated with over 17 space-related organizations, at an estimated cost exceeding $300,000 (US). Masters-level programs and training programs have evolved to address the needs of these practitioner communities based upon these results. The ROCK reintroduced rigor and depth to the practitioner's development in these critical disciplines enabling their ability to take mission concepts from imagination to reality.
Solid Waste Management Available Information Materials. Total Listing 1966-1976.
ERIC Educational Resources Information Center
Larsen, Julie L.
This publication is a compiled and indexed bibliography of solid waste management documents produced in the last ten years. This U.S. Environmental Protection Agency (EPA) publication is compiled from the Office of Solid Waste Management Programs (OSWMP) publications and the National Technical Information Service (NTIS) reports. Included are…
75 FR 38793 - Office of Postsecondary Education
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... funds to improve and strengthen the institution's academic quality, institutional management and fiscal... other institutions. Invitational Priority 3. Develop academic programs to improve course completion... and college or career pathway programs that integrate basic academic instruction with technical or...
Adapting Project Management Practices to Research-Based Projects
NASA Technical Reports Server (NTRS)
Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.
2007-01-01
From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.
Anderson, Malcolm; Holcombe, Liz
2006-01-01
This article stresses the importance of within-government capacity build as the optimal approach to minimizing landslide risk to the most vulnerable communities in the developing world. Landslide risk is an integrated issue that demands strong managerial leadership and multidisciplinary inclusion to develop structures that deliver sustainable improvements in the reduction of risk. The tension between projects demanding international technical and financial intervention and those capable of "within-country" solutions are examined. More particularly, the challenges of developing a management methodology capable of energizing inter-ministry collaboration to achieve community-level action is examined in the context of a recently established program of slope stability management in St. Lucia. The program, Management of Slope Stability in Communities (MoSSaiC), is shown to have successfully fostered not only extensive technical collaboration within government but also to have energized local communities in the shared mission of capacity build through their direct involvement in the management process.
NASA Astrophysics Data System (ADS)
Anderson, Malcolm; Holcombe, Liz
2006-01-01
This article stresses the importance of within-government capacity build as the optimal approach to minimizing landslide risk to the most vulnerable communities in the developing world. Landslide risk is an integrated issue that demands strong managerial leadership and multidisciplinary inclusion to develop structures that deliver sustainable improvements in the reduction of risk. The tension between projects demanding international technical and financial intervention and those capable of “within-country” solutions are examined. More particularly, the challenges of developing a management methodology capable of energizing inter-ministry collaboration to achieve community-level action is examined in the context of a recently established program of slope stability management in St. Lucia. The program, Management of Slope Stability in Communities (MoSSaiC), is shown to have successfully fostered not only extensive technical collaboration within government but also to have energized local communities in the shared mission of capacity build through their direct involvement in the management process.
Accountability and Other CAUSES of Total Quality Management.
ERIC Educational Resources Information Center
Aamot, Karen; Piotrowski, Craig
1995-01-01
Describes Total Quality Management (TQM) techniques implemented at Waukesha County Technical College (Wisconsin). The CAUSES program focuses on customers, accountability, understanding, self-improvement, education, and searching. Describes application of TQM to the fixed-asset team project. Four figures are included. (LMI)
Management Auditing. Evaluation of the Marine Corps Task Analysis Program. Technical Report No. 5.
ERIC Educational Resources Information Center
Hemphill, John M., Jr.; Yoder, Dale
The management audit is described for possible application as an extension of the mission of the Office of Manpower Utilization (OMU) of the U.S. Marine Corps. The present mission of OMU is viewed as a manpower research program to conduct task analysis of Marine Corps occupational fields. Purpose of the analyses is to improve the functional areas…
Chips: A Tool for Developing Software Interfaces Interactively.
1987-10-01
of the application through the objects on the screen. Chips makes this easy by supplying simple and direct access to the source code and data ...object-oriented programming, user interface management systems, programming environments. Typographic Conventions Technical terms appearing in the...creating an environment in which we could do our work. This project could not have happened without him. Jeff Bonar started and managed the Chips
Forest health monitoring: 2006 national technical report
Mark J. Ambrose; Barbara L. Conkling
2009-01-01
The Forest Health Monitoring Programâs annual national technical report presents results of forest health analyses from a national perspective using data from a variety of sources. The report is organized according to the Criteria and Indicators for the Conservation and Sustainable Management of Temperate and Boreal Forests of the...
DOT National Transportation Integrated Search
2016-08-01
This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...
Forest health monitoring: 2005 national technical report
Mark J. Ambrose; Barbara L. Conkling
2007-01-01
The Forest Health Monitoring program's annual national technical report presents results of forest health analyses from a national perspective using data from a variety of sources. The report is organized according to the Criteria and Indicators for the Conservation and Sustainable Management of Temperate and Boreal Forests of the Santiago Declaration. The results...
Community Colleges in an Aging Society.
ERIC Educational Resources Information Center
Ventura-Merkel, Catherine; Doucette, Don
1993-01-01
According to survey responses from 388 of 1,288 community and technical colleges, only one-fourth offer programs specifically for older adults. Most programs stress recreation, enrichment, and financial management, which do not necessarily reflect the educational needs of this population. (SK)
Transitioning HIV care and treatment programs in southern Africa to full local management.
Vermund, Sten H; Sidat, Mohsin; Weil, Lori F; Tique, José A; Moon, Troy D; Ciampa, Philip J
2012-06-19
Global AIDS programs such as the US President's Emergency Plan for AIDS Relief (PEPFAR) face a challenging health care management transition. HIV care must evolve from vertically-organized, externally-supported efforts to sustainable, locally controlled components that are integrated into the horizontal primary health care systems of host nations. We compared four southern African nations in AIDS care, financial, literacy, and health worker capacity parameters (2005 to 2009) to contrast in their capacities to absorb the huge HIV care and prevention endeavors that are now managed with international technical and fiscal support. Botswana has a relatively high national income, a small population, and an advanced HIV/AIDS care program; it is well poised to take on management of its HIV/AIDS programs. South Africa has had a slower start, given HIV denialism philosophies of the previous government leadership. Nonetheless, South Africa has the national income, health care management, and health worker capacity to succeed in fully local management. The sheer magnitude of the burden is daunting, however, and South Africa will need continuing fiscal assistance. In contrast, Zambia and Mozambique have comparatively lower per capita incomes, many fewer health care workers per capita, and lower national literacy rates. It is improbable that fully independent management of their HIV programs is feasible on the timetable being contemplated by donors, nor is locally sustainable financing conceivable at present. A tailored nation-by-nation approach is needed for the transition to full local capacitation; donor nation policymakers must ensure that global resources and technical support are not removed prematurely.
Solar heating and cooling technical data and systems analysis
NASA Technical Reports Server (NTRS)
Christensen, D. L.
1976-01-01
The acquisition and processing of selected parametric data for inclusion in a computerized Data Base using the Marshall Information Retrieval and Data System (MIRADS) developed by NASA-MSFC is discussed. This data base provides extensive technical and socioeconomic information related to solar energy heating and cooling on a national scale. A broadly based research approach was used to assist in the support of program management and the application of a cost-effective program for solar energy development and demonstration.
External Tank Program Legacy of Success
NASA Technical Reports Server (NTRS)
Welzyn, Ken; Pilet, Jeff
2010-01-01
I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.
Laboratory Directed Research and Development 1998 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pam Hughes; Sheila Bennett eds.
1999-07-14
The Laboratory's Directed Research and Development (LDRD) program encourages the advancement of science and the development of major new technical capabilities from which future research and development will grow. Through LDRD funding, Pacific Northwest continually replenishes its inventory of ideas that have the potential to address major national needs. The LDRD program has enabled the Laboratory to bring to bear its scientific and technical capabilities on all of DOE's missions, particularly in the arena of environmental problems. Many of the concepts related to environmental cleanup originally developed with LDRD funds are now receiving programmatic support from DOE, LDRD-funded work inmore » atmospheric sciences is now being applied to DOE's Atmospheric Radiation Measurement Program. We also have used concepts initially explored through LDRD to develop several winning proposals in the Environmental Management Science Program. The success of our LDRD program is founded on good management practices that ensure funding is allocated and projects are conducted in compliance with DOE requirements. We thoroughly evaluate the LDRD proposals based on their scientific and technical merit, as well as their relevance to DOE's programmatic needs. After a proposal is funded, we assess progress annually using external peer reviews. This year, as in years past, the LDRD program has once again proven to be the major enabling vehicle for our staff to formulate new ideas, advance scientific capability, and develop potential applications for DOE's most significant challenges.« less
Maintenance manager's manual for small transit agencies. Special report 1985-1986
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fowler, W.
1988-03-01
This publication contains information to assist operators of transit agencies providing public transportation in rural and smaller urban areas to better manage their vehicle maintenance programs. The report includes discussions of maintenance management, maintenance programs preventive maintenance, recordkeeping, selection of type of maintenance operation, in-house maintenance, and maintenance practices. Also included are appendixes giving supplementary information about tire loads; lubrication oil; mechanic hand tools; shop tools; mechanic aptitude tests; technical training resources; maintenance management training resources; and lists of manufacturers of air-conditioning systems, wheelchair lifts and wheelchair ramps.
The Two-Year Colleges' Role in Building the Future Geoscience Technical Workforce
NASA Astrophysics Data System (ADS)
Wolfe, B.
2014-12-01
Careers in energy science related fields represent significant job growth in the U.S. Yet post-secondary career and technical programs have not kept pace with demand and energy science curriculum, including fundamental concepts of energy generation and environmental impact, lacks a firm position among general or career and technical education courses. Many of these emerging energy related jobs are skilled labor and entry level technical positions requiring less than a bachelor's degree. These include jobs such as solar/photovoltaic design and installation, solar water and space heating installation, energy management, efficiency and conservation auditor, environmental technician, etc. These energy related career pathways fit naturally within the geosciences discipline. Many of these jobs can be filled by individuals from HVAC, Industrial technology, welding, and electrical degree programs needing some additional specialized training and curriculum focused on fundamental concepts of energy, fossil fuel exploration and use, atmospheric pollution, energy generation, alternative energy sources, and energy conservation. Two-year colleges (2ycs) are uniquely positioned to train and fill these workforce needs as they already have existing career and technical programs and attract both recent high school graduates, as well as non-traditional students including displaced workers and returning veterans. We have established geoscience related workforce certificate programs that individuals completing the traditional industrial career and technical degrees can obtain to meet these emerging workforce needs. This presentation will discuss the role of geosciences programs at 2ycs in training these new workers, developing curriculum, and building a career/technical program that is on the forefront of this evolving industry.
Managing the Podcast Lecture: A Hybrid Approach for Online Lectures in the Business Classroom
ERIC Educational Resources Information Center
Hollandsworth, Randall J.
2007-01-01
This article discusses a pilot project applying podcast technology to a management course. The project was designed, implemented, and evaluated in spring 2006 in conjunction with the Management and Supervisory Development program at Athens Technical College (Athens, Georgia). The project goals were to evaluate the pedagogical, logistical, and…
Office of Management Services 1989 Annual Report.
ERIC Educational Resources Information Center
Association of Research Libraries, Washington, DC. Office of Management Studies.
Designed to serve both as an activity report on Office of Management Services (OMS) progress during 1989 and a catalog of OMS services and products, this annual report focuses on the management of human and technical resources in a scholarly environment. Programs and services are reported in four sections: (1) Applied Research and Development (the…
Guidance includes technical assistance to state, local, and tribal program managers on means of reducing nonpoint source pollution of surface and ground water through the protection and restoration of wetlands and riparian areas.
PCs: Key to the Future. Business Center Provides Sound Skills and Good Attitudes.
ERIC Educational Resources Information Center
Pay, Renee W.
1991-01-01
The Advanced Computing/Management Training Program at Jordan Technical Center (Sandy, Utah) simulates an automated office to teach five sets of skills: computer architecture and operating systems, word processing, data processing, communications skills, and management principles. (SK)
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
The AEC-NASA Nuclear Rocket Program
NASA Astrophysics Data System (ADS)
Finger, Harold B.
2002-01-01
The early days and years of the National Aeronautics and Space Administration (NASA), its assigned missions its organization and program development, provided major opportunities for still young technical people to participate in and contribute to making major technological advances and to broaden and grow their technical, management, and leadership capabilities for their and our country's and the world's benefit. Being one of those fortunate beneficiaries while I worked at NASA's predecessor, the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory in Cleveland and then when I was transferred to the NASA Headquarters on October 1, 1958, the day NASA was formally activated, this paper will describe some of my experiences and their significant results, including the personal benefits I derived from that fabulous period of our major national accomplishments. Although I had a broad range of responsibility in NASA which changed and grew over time, I concentrate my discussion in this paper on those activities conducted by NASA and the Atomic Energy Committee (AEC) in the development of the technology of nuclear rocket propulsion to enable the performance of deep space missions. There are two very related but distinct elements of this memoir. One relates to NASA's and the U.S. missions in those very early years and some of the technical and administrative elements as well as the political influences and interagency activities, including primarily the AEC and NASA, as well as diverse industrial and governmental capabilities and activities required to permit the new NASA to accomplish its assigned mission responsibilities. The other concerns the more specific technical and management assignments used to achieve the program's major technological successes. I will discuss first, how and why I was assigned to manage those nuclear rocket propulsion program activities and, then, how we achieved our very significant and successful program progress. There is no question that the entire program reflects the outstanding contributions of a tremendously effective and diversely capable team of organizations and people. I will then try to sum up the broad benefits that I, personally, had as a result of that experience, how it influenced my future activities throughout my working career, the management principles and lessons that guided me through all the diverse activities I led, as well as emphasizing the major national space system and mission capability benefits that we achieved in that nuclear rocket program and some of the international recognition of that work. There is no question that my assignment to lead the joint AEC-NASA nuclear rocket development when responsibility for nuclear propulsion was transferred from the Air Corps to NASA, on its establishment, involved significant persistence on the part of the then NASA Administrator, Dr. T. Keith Glennan, to overcome the very strong political preferences of powerful congressional figures. Some of that surprised me and I will review that period. Once named to the position of Manager of the joint AEC-NASA Nuclear Propulsion Office, I still had to prove myself to those powerful figures, including Senator Clinton Anderson, which the record and history indicate I did. But the real proof of my contribution to the program was in the positions I took to assure that the program was conducted in a consistently sound technological and management way to overcome and avoid technical problems that were encountered in the program. That required standing firmly with conviction for what I considered sound development.
Heimeshoff, Mareike; Schreyögg, Jonas; Kwietniewski, Lukas
2014-06-01
This is the first study to use stochastic frontier analysis to estimate both the technical and cost efficiency of physician practices. The analysis is based on panel data from 3,126 physician practices for the years 2006 through 2008. We specified the technical and cost frontiers as translog function, using the one-step approach of Battese and Coelli to detect factors that influence the efficiency of general practitioners and specialists. Variables that were not analyzed previously in this context (e.g., the degree of practice specialization) and a range of control variables such as a patients' case-mix were included in the estimation. Our results suggest that it is important to investigate both technical and cost efficiency, as results may depend on the type of efficiency analyzed. For example, the technical efficiency of group practices was significantly higher than that of solo practices, whereas the results for cost efficiency differed. This may be due to indivisibilities in expensive technical equipment, which can lead to different types of health care services being provided by different practice types (i.e., with group practices using more expensive inputs, leading to higher costs per case despite these practices being technically more efficient). Other practice characteristics such as participation in disease management programs show the same impact throughout both cost and technical efficiency: participation in disease management programs led to an increase in both, technical and cost efficiency, and may also have had positive effects on the quality of care. Future studies should take quality-related issues into account.
Library-Specific Microcomputer Software.
ERIC Educational Resources Information Center
Levert, Virginia M.
1985-01-01
Discusses number and type of microcomputer software programs useful to libraries and types of hardware on which they run, as identified by Nolan Information Management Services. Highlights include general application programs, applications designed to support library technical processes, producers of library software, and choosing among options.…
Review of literature and practices for incident management programs : technical report.
DOT National Transportation Integrated Search
2016-06-01
The project team examined project evaluations, best practice summaries, and synthesis documents, and derived a summary of key elements of programs to speed the time to find and clear stalled vehicles and crashes from freeway shoulders and main lanes....
The MetSkill Program — Rapidly Developing Effective Young Engineers in the Workplace
NASA Astrophysics Data System (ADS)
Drinkwater, Diana; Bianco, Nina
MetSkill is a professional development program for metallurgical engineers that integrates with normal duties in their first one or two years of service. Graduates work together on a structured technical project, facilitated by specialists and supported by formal learning, and ultimately reported to their technical managers. The program enables graduates to "fill the gaps" in their undergraduate education, which is increasingly pertinent as engineering degrees become more general. Participants report that they enjoy the focus on more challenging (rewarding) aspects of their jobs and feel more confident about problem solving. Sponsor companies add that the relationships developed with external technical specialists enhances opportunities for innovation and development. MetSkill was delivered to two major resource companies in Australia in 2012. This paper provides an outline of the program and the reasons for its success, and demonstrates how the learning model could be applied to groups of graduates in other engineering disciplines.
77 FR 14955 - DoD Information Assurance Scholarship Program (IASP)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
... IA and information technology (IT) management, technical, digital and multimedia forensics, cyber..., digital and multimedia forensics, electrical engineering, electronics engineering, information security...
NASA Technical Reports Server (NTRS)
Gavert, Raymond B.
1990-01-01
Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.
Hefelfinger, Jenny; Patty, Alice; Ussery, Ann; Young, Walter
2013-10-24
This study assessed the value of technical assistance provided by state health department expert advisors and by the staff of the National Association of Chronic Disease Directors (NACDD) to community groups that participated in the Action Communities for Health, Innovation, and Environmental Change (ACHIEVE) Program, a CDC-funded health promotion program. We analyzed quantitative and qualitative data reported by community project coordinators to assess the nature and value of technical assistance provided by expert advisors and NACDD staff and the usefulness of ACHIEVE resources in the development and implementation of community action plans. A grounded theory approach was used to analyze and categorize phrases in text data provided by community coordinators. Open coding placed conceptual labels on text phrases. Frequency distributions of the quantitative data are described and discussed. The most valuable technical assistance and program support resources were those determined to be in the interpersonal domain (ie, interactions with state expert advisors, NACDD staff, and peer-to-peer support). The most valuable technical assistance events were action institutes, coaches' meetings, webinars, and technical assistance conference calls. This analysis suggests that ACHIEVE communities valued the management and training assistance provided by expert advisors and NACDD staff. State health department expert advisors provided technical guidance and support, including such skills or knowledge-based services as best-practice strategies, review and discussion of community assessment data, sustainability planning, and identification of possible funding opportunities. NACDD staff led development and implementation of technical assistance events.
ERIC Educational Resources Information Center
Hepburn, Larry; Shin, Masako
This document, one of eight in a multi-cultural competency-based vocational/technical curricula series, is on food service. This program is designed to run 24 weeks and cover 15 instructional areas: orientation, sanitation, management/planning, preparing food for cooking, preparing beverages, cooking eggs, cooking meat, cooking vegetables,…
ERIC Educational Resources Information Center
Ford, Julie Dyke; Newmark, Julianne
2011-01-01
This article presents follow-up information to a previous publication regarding ways to increase emphasis on research skills in undergraduate Technical Communication curricula. We detail the ways our undergraduate program highlights research by requiring majors to complete senior thesis projects that culminate in submission to an online…
ERIC Educational Resources Information Center
Bailey, Anthony
2011-01-01
This paper investigates teaching practices at the Australia-Pacific Technical College (APTC), which comprise a unique official development assistance (ODA) program funded by the Government of Australia (GoA) and managed through the Australian Agency for International Development (AusAid) with the aim of training and equipping workers from the…
40 CFR 1.33 - Office of Administration and Resources Management.
Code of Federal Regulations, 2011 CFR
2011-07-01
... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
DOT National Transportation Integrated Search
2015-04-01
Research done through the Second Strategic Highway Research Program (SHRP 2) determined that agencies with the most effective transportation systems management and operations (TSM&O) activities were differentiated not by budgets or technical skills a...
40 CFR 1.33 - Office of Administration and Resources Management.
Code of Federal Regulations, 2012 CFR
2012-07-01
... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...
40 CFR 1.33 - Office of Administration and Resources Management.
Code of Federal Regulations, 2014 CFR
2014-07-01
... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...
40 CFR 1.33 - Office of Administration and Resources Management.
Code of Federal Regulations, 2013 CFR
2013-07-01
... provides national program policy and technical guidance for: The acquisition of all information technology... acquired by grantees and contractors using Agency funds; the operation of all Agency computers and... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce...
ERIC Educational Resources Information Center
Arkansas Univ., Fayetteville.
This guide for instruction in the basics of entrepreneurship is intended for use in adult education programs, and secondary and postsecondary business education programs. It can be used as integrative material for all vocational-technical programs as well, since it provides a beginning point for those who are interested in self-employment and for…
An Overview of NASA's Program of Future M&S VV&A Outreach and Training Activities
NASA Technical Reports Server (NTRS)
Caine, Lisa; Hale, Joseph P.
2006-01-01
NASA's Exploration Systems Mission Directorate (ESMD) is implementing a management approach for modeling and simulation (M&S) that will provide decision-makers information on the model s fidelity, credibility, and quality. The Integrated Modeling & Simulation Verification, Validation and Accreditation (IM&S W&A) process will allow the decision-maker to understand the risks involved in using a model s results for mission-critical decisions. The W&A Technical Working Group (W&A TWG) has been identified to communicate this process throughout the agency. As the W&A experts, the W&A NVG will be the central resource for support of W&A policy, procedures, training and templates for documentation. This presentation will discuss the W&A Technical Working Group s outreach approach aimed at educating M&S program managers, developers, users and proponents on the W&A process, beginning at MSFC with the CLV program.
Space station attached payload program support
NASA Technical Reports Server (NTRS)
Estes, Maurice G., Jr.; Brown, Bardle D.
1989-01-01
The USRA is providing management and technical support for the peer review of the Space Station Freedom Attached Payload proposals. USRA is arranging for consultants to evaluate proposals, arranging meeting facilities for the reviewers to meet in Huntsville, Alabama and management of the actual review meetings. Assistance in developing an Experiment Requirements Data Base and Engineering/Technical Assessment support for the MSFC Technical Evaluation Team is also being provided. The results of the project will be coordinated into a consistent set of reviews and reports by USRA. The strengths and weaknesses analysis provided by the peer panel reviewers will by used NASA personnel in the selection of experiments for implementation on the Space Station Freedom.
TECHNICAL GUIDANCE DOCUMENT: INSPECTION TECHNIQUES FOR THE FABRICATION OF GEOMEMBRANE FIELD SEAMS
Subtitle C of the Resource Conservation and Recovery Act (RCRA) requires the U.S. Environmental Protection Agency (EPA) to establish a Federal hazardous waste management program. This program must ensure that hazardous wastes are handled safely from generation until final dispos...
DOT National Transportation Integrated Search
1999-10-31
In May, 1997, the National Private Truck Councils (NPTC) Private Fleet Management Institute (PFMI) began a research program in cooperation with Sue Roberts Health Concepts, Inc., ATA Foundation, Inc., and the Federal Motor Carrier Safety Administr...
Program budgeting and marginal analysis: a case study in chronic airflow limitation.
Crockett, A; Cranston, J; Moss, J; Scown, P; Mooney, G; Alpers, J
1999-01-01
Program budgeting and marginal analysis is a method of priority-setting in health care. This article describes how this method was applied to the management of a disease-specific group, chronic airflow limitation. A sub-program flow chart clarified the major cost drivers. After assessment of the technical efficiency of the sub-programs and careful and detailed analysis, incremental and decremental wish lists of activities were established. Program budgeting and marginal analysis provides a framework for rational resource allocation. The nurturing of a vigorous program management group, with members representing all participants in the process (including patients/consumers), is the key to a successful outcome.
Nuclear facility decommissioning and site remedial actions. Volume 6. A selected bibliography
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Michelson, D.C.; Knox, N.P.
1985-09-01
This bibliography of 683 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the sixth in a series of annual reports prepared for the US Department of Energy's Remedial Action Programs. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's remedial action program. Majormore » chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Facilities Contaminated with Natural Radioactivity; (5) Uranium Mill Tailings Remedial Action Program; (6) Grand Junction Remedial Action Program; (7) Uranium Mill Tailings Management; (8) Technical Measurements Center; and (9) General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 7 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate affiliation or by publication description.« less
Energy materials coordinating committee (EMACC) Fiscal Year 1982. Annual technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
1983-03-01
The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further the effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/ workshops on selected topics involving both DOE and major contractors. In addition, the EMaCC aids in obtaining materials - related inputs for both intra- and interagency compilations. Membership in the EMaCC is open to any Department organizational unit; participants are appointed by Division or Office Directors. The current membership is listed inmore » Table 1. The EMACC reports to the Director of the Office of Energy Research in his capacity as overseer of the technical programs of the Department. This annual technical report is mandated by the EMACC terms of reference. In this report are described 1) EMACC activities for FY 1982; 2) a summary of materials funding in the Department from FY 1978 to the present; and 3) on-going materials programs in the Department.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... unclassified information, shall, in response to specific threat data and based on risk management principles... most economical means in the various TSCM programs, departments and agencies shall exchange technical...
Septic Systems Guidance, Policy, and Regulations
EPA has developed several documents outlining its mission, priorities and regulatory authorities as well as guidance and technical information to help communities establish comprehensive septic (onsite) management programs.
Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Na; Goel, Supriya; Makhmalbaf, Atefe
The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in amore » way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.« less
NASA Technical Reports Server (NTRS)
Rocker, JoAnne; Roncaglia, George J.; Heimerl, Lynn N.; Nelson, Michael L.
2002-01-01
Interoperability and data-exchange are critical for the survival of government information management programs. E-government initiatives are transforming the way the government interacts with the public. More information is to be made available through web-enabled technologies. Programs such as the NASA's Scientific and Technical Information (STI) Program Office are tasked to find more effective ways to disseminate information to the public. The NASA STI Program is an agency-wide program charged with gathering, organizing, storing, and disseminating NASA-produced information for research and public use. The program is investigating the use of a new protocol called the Open Archives Initiative (OAI) as a means to improve data interoperability and data collection. OAI promotes the use of the OAI harvesting protocol as a simple way for data sharing among repositories. In two separate initiatives, the STI Program is implementing OAI In collaboration with the Air Force, Department of Energy, and Old Dominion University, the NASA STI Program has funded research on implementing the OAI to exchange data between the three organizations. The second initiative is the deployment of OAI for the NASA technical report server (TRS) environment. The NASA TRS environment is comprised of distributed technical report servers with a centralized search interface. This paper focuses on the implementation of OAI to promote interoperability among diverse data repositories.
ERIC Educational Resources Information Center
British Council, London (England).
Proceedings of a seminar on the management of English second language training (ELT) in British technical assistance programs are presented in the form of narrative summaries. An introductory section gives an overview of the conference. Four subsequent chapters summarize presentations and discussions on these topics: project management,…
DOT National Transportation Integrated Search
2002-04-01
Louisianan has established a traffic monitoring program, compliant with FHWA incentives, that is designed to collect and manage the traffic data needed for the design and management of LADOTD's network of current and future highways. In the early 198...
78 FR 25252 - Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
... nonprofit corporations to fund the development of drinking water, wastewater, and solid waste disposal...), section 310B authorizes Solid Waste Management grants. Grants are made for 100 percent of the cost of assistance. The Technical Assistance and Training Grants and Solid Waste Management Grants programs are...
Ohio Legal Office Managment. Technical Competency Profile (TCP).
ERIC Educational Resources Information Center
Ray, Gayl M.; Wilson, Nick; Mangini, Rick
This document, which lists core business and legal office management competencies identified by representatives from education and business and industry throughout Ohio, is intended to assist individuals and organizations in developing college tech prep programs that will prepare students from secondary through post-secondary associate degree…
A Compendium of Energy Conservation Success Stories
DOE R&D Accomplishments Database
1988-09-01
Three-quarters of DOE's Conservation R and D funds have been devoted to technology research and development: basic and applied research, exploratory R and D, engineering feasibility studies, pilot-scale prototype R and D, and technology demonstration. Non R and D projects have involved technology assessment program planning and analysis, model development, technology transfer and consumer information, health effects and safety research, and technical support for rule making. The success stories summarized in this compendium fall into three general categories: Completed Technology Success Stories, projects that have resulted in new energy-saving technologies that are presently being used in the private sector; Technical Success Stories, projects that have produced or disseminated important scientific/technical information likely to result in future energy savings; Program Success Stories, non-R and D activities that have resulted in nationally significant energy benefits. The Energy Conservation research and development program at DOE is managed by the Office of Conservation under the direction of the Deputy Assistant Secretary for Conservation. Three subordinate Program Offices correspond to the buildings, transportation, and industrial end-use sectors. A fourth subordinate Program Office{endash}Energy Utilization Research{endash}sponsors research and technical inventions for all end-use sectors.
Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1
NASA Technical Reports Server (NTRS)
Estes, Ronald H. (Editor)
1993-01-01
This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.
Baiden, F; Malm, K; Bart-Plange, C; Hodgson, A; Chandramohan, D; Webster, J; Owusu-Agyei, S
2014-06-01
The presumptive approach was the World Health Organisation (WHO) recommended to the management of malaria for many years and this was incorporated into syndromic guidelines such as the Integrated Management of Childhood Illnesses (IMCI). In early 2010 however, WHO issued revised treatment guidelines that call for a shift from the presumptive to the test-based approach. Practically, this implies that in all suspected cases, the diagnosis of uncomplicated malaria should be confirmed using rapid test before treatment is initiated. This revision effectively brings to an end an era of clinical practice that span several years. Its implementation has important implications for the health systems in malaria-endemic countries. On the basis of research in Ghana and other countries, and evidence from program work, the Ghana National Malaria Control Program has issued revised national treatment guidelines that call for implementation of test-based management of malaria in all cases, and across all age groups. This article reviews the evidence and the technical basis for the shift to test-based management and examines the implications for malaria control in Ghana.
ERIC Educational Resources Information Center
Wisconsin State Board of Vocational, Technical and Adult Education, Madison. Wisconsin Technical Coll. System.
The Wisconsin Workplace Partnership Training Program involved the state's technical college system board, state chapter of the AFL-CIO, Wisconsin Manufacturers and Commerce, and Madison Center on Education and Work. The state-level education-labor-management partnership was mirrored at the local level in 28 worksite education centers. Instruction…
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
MINE WASTE TECHNOLOGY PROGRAM:HISTORICAL PERSPECTIVES. CURRENT HIGHLIGHTS, FUTURE OPPORTUNITIES
For the past 13 years, the Mine Waste Technology Program has been technically driven by the National Risk Management Research Lab. A portion of the MWTP funding has been used to perform field demonstrations of innovative technologies with the potential to address mine waste issue...
Information Exchange Procedures. Outcomes Study Procedures. Technical Report No. 66.
ERIC Educational Resources Information Center
Byers, Maureen
The Information Exchange Procedures (IEP) developed by the National Center for Higher Education Management Systems (NCHEMS) are a set of standard definitions and procedures for collecting information about disciplines and student degree programs, outcomes of instructional programs, and general institutional characteristics. A fundamental purpose…
Technical implementation of an Internet address database with online maintenance module.
Mischke, K L; Bollmann, F; Ehmer, U
2002-01-01
The article describes the technical implementation and management of the Internet address database of the center for ZMK (University of Münster, Dental School) Münster, which is integrated in the "ZMK-Web" website. The editorially maintained system guarantees its topicality primarily due to the electronically organized division of work with the aid of an online maintenance module programmed in JavaScript/PHP, as well as a database-related feedback function for the visitor to the website through configuration-independent direct mail windows programmed in JavaScript/PHP.
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
International Space Station ECLSS Technical Task Agreement Summary Report
NASA Technical Reports Server (NTRS)
Ray, C. D. (Compiler); Salyer, B. H. (Compiler)
1999-01-01
This Technical Memorandum provides a summary of current work accomplished under Technical Task Agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the International Space Station (ISS) Environmental Control and Life Support System (ECLSS). Current activities include ECLSS component design and development, computer model development, subsystem/integrated system testing, life testing, and general test support provided to the ISS program. Under ECLSS design, MSFC was responsible for the six major ECLSS functions, specifications and standard, component design and development, and was the architectural control agent for the ISS ECLSS. MSFC was responsible for ECLSS analytical model development. In-house subsystem and system level analysis and testing were conducted in support of the design process, including testing air revitalization, water reclamation and management hardware, and certain nonregenerative systems. The activities described herein were approved in task agreements between MSFC and NASA Headquarters Space Station Program Management Office and their prime contractor for the ISS, Boeing. These MSFC activities are in line to the designing, development, testing, and flight of ECLSS equipment planned by Boeing. MSFC's unique capabilities for performing integrated systems testing and analyses, and its ability to perform some tasks cheaper and faster to support ISS program needs, are the basis for the TTA activities.
ERIC Educational Resources Information Center
Pressley, Warren H., Jr.
In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…
Program objectives for the National Water Data Exchange (NAWDEX) for fiscal year 1979
Edwards, Melvin D.
1978-01-01
This report describes the program objectives of the National Water Data Exchange (NAWDEX) for Fiscal Year 1979. These objectives include NAWDEX membership, program administration, management, and coordination, NAWDEX services, identification of sources of water data, indexing of water data, programs and systems documentation, recommended methods for the handling and exchange of water data, training, and technical assistance to NAWDEX members. (Woodard-USGS)
ERIC Educational Resources Information Center
Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.
This document outlines the curriculum of Louisiana's office systems technology associate degree program, which is a 6-term (75-credit hour) competency-based program designed to prepare students for employment as special assistants for business executives and top management. Presented first are a description of the program and a list of the general…
Contracting Officer's Technical Representatives
NASA Technical Reports Server (NTRS)
Brisbin, Steve
1997-01-01
The Breakout Session is a traditional conference instrument used by the NASA Occupational Health Program (OHP) as a method to convene people with common interests. Typically these sessions provide discussion of current topics of high priority and currency and allow multiple views and opinions to be shared and evaluated by all participants. Since the Contracting Officer's Technical Representatives (COTRs) occupy the technical focus of support contract management, this particular group, attended by 20 representatives, addressed issues and topics at the forefront of operational concerns.
1993-12-01
Iaporta .. y be definitive for the tubjoct proaentod, exploratory in natura, or an evaluation of critical Aubayato• or of technical problema , 4...International Security 9 Social and Natural Science Studies Field 41 Edit: (Type 3) -Entry of an invalid code when Performance Type is "C" or "M" will...analysis SF Foreign area social science research SP Foreign area policy planAing research BF Identifies databases with data on foreign forces or
Engineering the System and Technical Integration
NASA Technical Reports Server (NTRS)
Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.
2011-01-01
Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.
41 CFR 128-1.8004 - Seismic Safety Coordinators.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program... individual with technical training, engineering experience and a seismic background as the Department of...
Environmental Science and Research Foundation, Inc. annual technical report: Calendar year 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reynolds, R.D.; Warren, R.W.
This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The Foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provides environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs includingmore » Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. Summaries are included of the individual research projects.« less
NASA Technical Reports Server (NTRS)
Taylor, Robert W.; Nash, Sally K.
2007-01-01
While technical training and advanced degree's assure proficiency at specific tasks within engineering disciplines, they fail to address the potential for communication breakdown and decision making errors familiar to multicultural environments where language barriers, intimidating personalities and interdisciplinary misconceptions exist. In an effort to minimize these pitfalls to effective panel review, NASA's lead safety engineers to the ISS Safety Review Panel (SRP), and Payload Safety Review Panel (PSRP) initiated training with their engineers, in conjunction with the panel chairs, and began a Panel Resource Management (PRM) program. The intent of this program focuses on the ability to reduce the barriers inhibiting effective participation from all panel attendees by bolstering participants confidence levels through increased communication skills, situational awareness, debriefing, and a better technical understanding of requirements and systems.
Allan, Catherine K; Thiagarajan, Ravi R; Beke, Dorothy; Imprescia, Annette; Kappus, Liana J; Garden, Alexander; Hayes, Gavin; Laussen, Peter C; Bacha, Emile; Weinstock, Peter H
2010-09-01
Resuscitation of pediatric cardiac patients involves unique and complex physiology, requiring multidisciplinary collaboration and teamwork. To optimize team performance, we created a multidisciplinary Crisis Resource Management training course that addressed both teamwork and technical skill needs for the pediatric cardiac intensive care unit. We sought to determine whether participation improved caregiver comfort and confidence levels regarding future resuscitation events. We developed a simulation-based, in situ Crisis Resource Management curriculum using pediatric cardiac intensive care unit scenarios and unit-specific resuscitation equipment, including an extracorporeal membrane oxygenation circuit. Participants replicated the composition of a clinical team. Extensive video-based debriefing followed each scenario, focusing on teamwork principles and technical resuscitation skills. Pre- and postparticipation questionnaires were used to determine the effects on participants' comfort and confidence regarding participation in future resuscitations. A total of 182 providers (127 nurses, 50 physicians, 2 respiratory therapists, 3 nurse practitioners) participated in the course. All participants scored the usefulness of the program and scenarios as 4 of 5 or higher (5 = most useful). There was significant improvement in participants' perceived ability to function as a code team member and confidence in a code (P < .001). Participants reported they were significantly more likely to raise concerns about inappropriate management to the code leader (P < .001). We developed a Crisis Resource Management training program in a pediatric cardiac intensive care unit to teach technical resuscitation skills and improve team function. Participants found the experience useful and reported improved ability to function in a code. Further work is needed to determine whether participation in the Crisis Resource Management program objectively improves team function during real resuscitations. 2010 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Kerby, Jerald; Counts, Stacy
2005-01-01
IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.
Guidance Manual: Asbestos Operations & Maintenance Work Practices. Second Edition.
ERIC Educational Resources Information Center
National Inst. of Building Sciences, Washington, DC.
This technical manual provides detailed guidance to building owners, asbestos program managers, and operations and maintenance (O&M) workers for managing asbestos-containing materials (ACM) in buildings. The manual addresses four different types of ACM found in buildings and three different levels of precaution which may be warranted by…
The Vocational Education Component of the Rhode Island Educational Management Information System.
ERIC Educational Resources Information Center
Galamaga, Donald P.; Bartolomeo, Paul A.
The document describes the implementation (Phase Two) of the Vocational Educational module--one component of an educational management information system. Phase Two entails the technical effort of final system design, final output specifications, edit specifications, system software selection, computer programing, systems documentation and the…
Energy Management Controls. Course Syllabus.
ERIC Educational Resources Information Center
Bergen County Vocational-Technical High School, Hackensack, NJ.
This course is one of four in a solar systems and energy management program developed by the Bergen County Vocational-Technical Schools to help tradespeople (heating, ventilation, and air conditioning; mechanics; plumbers; and electricians) to develop an awareness of alternate energy sources and to gain skills in the areas of solar installations…
76 FR 584 - Glen Canyon Dam Adaptive Management Program Work Group (AMWG)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-05
... 2010 expenditures, (2) updates on High Flow Experimental Protocol and the Non-native Fish Control... Group (AMWG) AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The... committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon...
Human Resource Management in Australian Registered Training Organisations
ERIC Educational Resources Information Center
Smith, Andrew; Hawke Geof
2008-01-01
This report forms part of a comprehensive research program that has examined issues related to building the organisational capability of vocational education and training providers. In particular, this report focuses on the current state of human resource management practice in both technical and further education and private registered training…
Librarians' Perspectives on the Factors Influencing Research Data Management Programs
ERIC Educational Resources Information Center
Faniel, Ixchel M.; Connaway, Lynn Silipigni
2018-01-01
This qualitative research study examines librarians' research data management (RDM) experiences, specifically the factors that influence their ability to support researchers' needs. Findings from interviews with 36 academic library professionals in the United States identify 5 factors of influence: (1) technical resources; (2) human resources; (3)…
The United States Postal Service (USPS) in cooperation with EPA's National Risk Management Research Laboratory (NRMRL) is engaged in an effort to integrate waste prevention and recycling activities into the waste management programs at Postal facilities. This report describes the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... have national significance and improve the performance of State vocational rehabilitation (VR) agencies... that State VR agencies and their partners, need national TA opportunities to improve program management and to keep informed about current effective and promising practices and research in the field of VR...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... programs, Homeless Management Information System (HMIS) data collection, reporting and research, including..., HUD. ACTION: Notice. SUMMARY: HUD announces the availability of the applicant information, deadline information, and other requirements for the Fiscal Year (FY) 2010 Special Needs Assistance Programs Technical...
Procedures for Determining Historical Full Costs. Technical Report 65. Second Edition.
ERIC Educational Resources Information Center
National Association of College and University Business Officers, Washington, DC.
The procedures form the costing component of the National Center for Higher Education Management Systems'"Information Exchange Procedures" (IEP). The IEP are a set of standard definitions and procedures for collecting information about disciplines and student degree programs, outcomes of instructional programs, and general institutional…
Managing Food Service Costs and Satisfying Customers.
ERIC Educational Resources Information Center
Reuther, Anne; Otto, Ione
1987-01-01
Milwaukee Area Technical College, Wisconsin, has four campuses, each with its own food service operation that, combined, serve nearly 3,000 people daily. Several food service-related programs are part of the curriculum. Cost containment and customer satisfaction are the two overriding goals of the food service programs. (MLF)
18 CFR 740.10 - Program review and assistance.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 2 2011-04-01 2011-04-01 false Program review and assistance. 740.10 Section 740.10 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE... the request of the State, specific technical assistance in water resources management; (ii) Determine...
18 CFR 740.10 - Program review and assistance.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Program review and assistance. 740.10 Section 740.10 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE... the request of the State, specific technical assistance in water resources management; (ii) Determine...
18 CFR 740.10 - Program review and assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Program review and assistance. 740.10 Section 740.10 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE... the request of the State, specific technical assistance in water resources management; (ii) Determine...
18 CFR 740.10 - Program review and assistance.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Program review and assistance. 740.10 Section 740.10 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE... the request of the State, specific technical assistance in water resources management; (ii) Determine...
18 CFR 740.10 - Program review and assistance.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Program review and assistance. 740.10 Section 740.10 Conservation of Power and Water Resources WATER RESOURCES COUNCIL STATE... the request of the State, specific technical assistance in water resources management; (ii) Determine...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
... Minority Business Development Agency's (MBDA) Native American Business Enterprise Center (NABEC) Program... collaboration among the NABECs and Minority Business Enterprises (MBEs) to achieve the same program goals, and... offering management and technical assistance through a nationwide network of 40 business centers. Among the...
Hefelfinger, Jenny; Patty, Alice; Ussery, Ann
2013-01-01
Introduction This study assessed the value of technical assistance provided by state health department expert advisors and by the staff of the National Association of Chronic Disease Directors (NACDD) to community groups that participated in the Action Communities for Health, Innovation, and Environmental Change (ACHIEVE) Program, a CDC-funded health promotion program. Methods We analyzed quantitative and qualitative data reported by community project coordinators to assess the nature and value of technical assistance provided by expert advisors and NACDD staff and the usefulness of ACHIEVE resources in the development and implementation of community action plans. A grounded theory approach was used to analyze and categorize phrases in text data provided by community coordinators. Open coding placed conceptual labels on text phrases. Frequency distributions of the quantitative data are described and discussed. Results The most valuable technical assistance and program support resources were those determined to be in the interpersonal domain (ie, interactions with state expert advisors, NACDD staff, and peer-to-peer support). The most valuable technical assistance events were action institutes, coaches’ meetings, webinars, and technical assistance conference calls. Conclusion This analysis suggests that ACHIEVE communities valued the management and training assistance provided by expert advisors and NACDD staff. State health department expert advisors provided technical guidance and support, including such skills or knowledge-based services as best-practice strategies, review and discussion of community assessment data, sustainability planning, and identification of possible funding opportunities. NACDD staff led development and implementation of technical assistance events. PMID:24157078
About the Board of Scientific Counselors (BOSC)
The EPA Board of Scientific Counselors (BOSC) provides advice, information, and recommendations to EPA’s Office of Research and Development (ORD) on technical and management issues of its research programs.
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Surveying Requirements Meeting Management Sessions, 1-5 February 1982,
1983-02-01
organized and conducted by the Engineering Division, Directorate of Civil Works, Office of the Chief of Engineers, to improve management and...Development) 1. Technical User Groups Overview - M. K. Miles, OCE 2. Organizing a Successful Computer Aided Applications Program - Dr. N. Radhakrishnan...2. Organization Structure 3. In-House Capabilities 4. Expertise Requirements 5. Professionalism TUESDAY-2 FEBRUARY No Management Activities WEDNESDAY
Thermal Transport in Diamond Films for Electronics Thermal Management
2018-03-01
AFRL-RY-WP-TR-2017-0219 THERMAL TRANSPORT IN DIAMOND FILMS FOR ELECTRONICS THERMAL MANAGEMENT Samuel Graham Georgia Institute of Technology MARCH...general public, including foreign nationals. Copies may be obtained from the Defense Technical Information Center (DTIC) (http://www.dtic.mil...Signature// JOHN D. BLEVINS, Program Manager ROSS W. DETTMER, Chief Devices for Sensing Branch Devices for Sensing Branch Aerospace Components
ERIC Educational Resources Information Center
Nowrasteh, Daryush M.
This publication is designed to serve state-level planners interested in reviewing the key concepts of state planning and management systems. The compact nature of the review and its organization in guideline format should provide a ready reference for the practitioner seeking to develop and improve management systems for vocational education in…
People Management. Final Report of the People Management Committee
1975-04-25
Objective Memorandum Planning, Programming, C Budgeting System Personnel Priority Model Projected Requisitioning Authority Prior ServIce Quality ...April 1975 PREPARED FOR - G THE DEPARTMENT OF ARMY OFFICE OF THE DEPUTY CHIEF OF STAFF FOR PERSONNEL NATIONAL TECHNICAL INFORMATION SERVICE US... service accessions and reenllstees. (3) Manage the DEP. (4) Bolster systems discipline. d. RecommendetIons; (1) That manpower objectives
NASA Technical Reports Server (NTRS)
Ervin, G. F.; Blomeyer, L. S.
1972-01-01
The Four Cities Program has completed the first year of the planned two-year program. At the beginning of the first year, a variety of program initiation activities were accomplished. Contracts were negotiated; science and technology advisors were interviewed, selected and assigned; general indoctrination and integration of the advisors into city affairs occurred; technical needs were identified and related projects pursued; pilot projects for the second year were identified; inter-city coordination on technical problems began to emerge; and the general soundness of the four cities program seems to have been established. Above all, the inter-personal relationships between the advisors and their interfaces in city government appear to be functioning smoothly. The establishment of such mutual respect, trusts, and confidences are believed essential to the success of the program.
A Microdata Model of Delayed Entry Program (DEP) Behavior. Technical Report 666.
ERIC Educational Resources Information Center
Phillips, Chester E.; Schmitz, Edward J.
High personnel loss rates among recruits who have signed up for the Army's Delayed Entry Program (DEP) are becoming an increasing problem for DEP program managers. Therefore, a research project was conducted to examine DEP loss as a function of sociodemography and policy variables at the microdata level. Two DEP loss models were created. The first…
NASA Astrophysics Data System (ADS)
Kennedy, Mike O.
An internship with the Martin Marietta Astronautics Group that was performed in partial fulfillment of the requirements for the Doctor of Engineering degree is documented. The internship included assignments with two Martin Marietta companies, on three different programs and in four areas of engineering. A first-hand look is taken at system engineering, SDI and advanced program management, and the way Martin Marietta conducts business. The five internship objectives were related to assignments in system modeling, system integration, engineering analysis and technical management: (1) The effects of thermally and mechanically induced mirror surface distortions upon the wavefront intensity field of a high energy laser beam passing through the optical train of a space-based laser system were modeled. (2) The restrictive as opposed to the broad interpretation of the 1972 ABM Treaty, and the capability of the Strategic Defense Initiative Zenith Star Program to comply with the Treaty were evaluated. (3) The capability of Martin Marietta to develop an automated analysis system to integrate and analyze Superconducting Super Collider detector designs was investigated. (4) The thermal models that were developed in support of the Small Intercontinental Ballistic Missile flight tests were described. (5) The technical management role of the Product Integrity Engineer assigned to the Zenith Star spacecraft's Beam Control and Transfer Subsystem was discussed. The relationships between the engineering, business, security and social concerns associated with the practice of engineering and the management of programs by a major defense contractor are explored.
Risk Management for the International Space Station
NASA Technical Reports Server (NTRS)
Sebastian, J.; Brezovic, Philip
2002-01-01
The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.
technological and implementation barriers faced by the residential construction industry. Prior to working at provides technical research management for DOE's Building America Program. In this role, she works to
NASA Astrophysics Data System (ADS)
Zadkov, Victor N.; Koroteev, Nikolai I.
1995-10-01
An experience of managing the continuing education and retraining programs at the International Laser Center (ILC) of Moscow State University is discussed. The offered programs are in a wide range of areas, namely laser physics and technology, laser biophysics and biomedicine, laser chemistry, and computers in laser physics. The attendees who are presumably scientists, engineers, technical managers, and graduate students can join these programs through the annual ILC term (6 months), individual training and research programs (up to a year), annual ILC Laser Graduate School, graduate study, and post-docs program, which are reviewed in the paper. A curriculum that includes basic and specialized courses is described in detail. A brief description of the ILC Laser Teaching and Computer Labs that support all the educational courses is given as well.
Management. A continuing bibliography with indexes. [March 1980
NASA Technical Reports Server (NTRS)
1980-01-01
This bibliography cites 604 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1979 covering the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. Program, project, and systems management; management policy, philosophy, tools, and techniques; decision making processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting are also covered. Abstracts are provided as well as subject, personal author, and corporate source indexes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Germain, Shawn W.; Farris, Ronald K.; Whaley, April M.
This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear powermore » plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.« less
Civilian Radioactive Waste Management System Requirements Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
C.A. Kouts
2006-05-10
The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less
2014 SRNL LDRD Annual Report, Rev. 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mcwhorter, S.
2015-03-15
Laboratory Directed Research and Development is a congressionally authorized program that provides the ‘innovation inspiration’ from which many of the Laboratory’s multi-discipline advancements are made in both science and engineering technology. The program is the backbone for insuring that scientific, technical and engineering capabilities can meet current and future needs. It is an important tool in reducing the probability of technological surprise by allowing laboratory technical staff room to innovate and keep abreast of scientific breakthroughs. Drawing from the synergism among the EM and NNSA missions, and work from other federal agencies ensures that LDRD is the key element inmore » maintaining the vitality of SRNL’s technical programs. The LDRD program aims to position the Laboratory for new business in clean energy, national security, nuclear materials management and environmental stewardship by leveraging the unique capabilities of the Laboratory to yield foundational scientific research in core business areas, while aligning with SRS strategic initiatives and maintaining a vision for ultimate DOE applications.« less
Environmental regulations: Technical reference manual TRM 016.01, September 15, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-15
This TRM is divided into two primary sections. The first section entitled Environmental Programs provides a synopsis of each environmental Act (Federal Law). The second section of the TRM is entitled Environmental Operations. This section is in effect the nuts and bolts of the regulatory compliance programs. In this section, the program manager can reference specific requirements which will aid in structuring the compliance program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Palermo, M.R.; Schroeder, P.R.
This technical note describes a technique for comparison of the predicted quality of effluent discharged from confined dredged material disposal areas with applicable water quality standards. This note also serves as documentation of a computer program called EFQUAL written for that purpose as part of the Automated Dredging and Disposal Alternatives Management System (ADDAMS).
A Study of Placing Army Requirements on Contract
2016-04-01
perhaps being unable to control the external environment, has management authority over business and technical aspects of a specific program. The PM...research is the last element of the planning phase addressing both business and technical considerations. The acquisition team equips themselves with...report is the final product utilizing documented findings and supports the business strategy (DoD, Guidebook for the Acquisition of Services, 2011
NASA's Management and Utilization of the Small Business Innovative Research (SBIR) Program
NASA Technical Reports Server (NTRS)
Mexcur, Winfield Paul
2003-01-01
The United Space Congress established the SBIR program in 1982 for the following purposes: ( 1) Stimulate technological innovation (2) Increase private-sector commercialization derived from federal R&D (3) Use small business to meet federal R&D needs (4) Foster and encourage participation by disadvantaged persons and women in technological innovation The STTR program was established in 1992 with the additional requirement of having a small business partner with a research institution (usually a university) for the purpose of transferring intellectual property from the research institution to the small business concern for enabling a government technical need and furthering the technological development for the purpose of developing commercial products. The government of Japan has established a program that models portions of the U.S. SBIR and STTR programs. They are very interested in how NASA has been so successful in fulfilling the Congressional objectives of these programs. In particular, they want to understand the management practices and incentives that are provided to enable partnerships between business enterprises, academia and government. The speech will also focus on some of the many successful technologies (on a conceptual level) that have been developed through NASA s SBIR and STTR programs and mechanisms used to promote cooperation between small businesses, large businesses, academia and government agencies within the United States. The speech is on a conceptual level, focusing on U.S. and NASA policies and management implementation practices. No enabling technical discussion will be held.
7 CFR 2.18 - Under Secretary for Food Safety.
Code of Federal Regulations, 2010 CFR
2010-01-01
... poultry and edible products thereof; voluntary inspection and certification of technical animal fat... programs in the agricultural sciences (7 U.S.C. 3318). (2) Related to committee management. Establish and...
Cooperative global security programs modeling & simulation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Briand, Daniel
2010-05-01
The national laboratories global security programs implement sustainable technical solutions for cooperative nonproliferation, arms control, and physical security systems worldwide. To help in the development and execution of these programs, a wide range of analytical tools are used to model, for example, synthetic tactical environments for assessing infrastructure protection initiatives and tactics, systematic approaches for prioritizing nuclear and biological threat reduction opportunities worldwide, and nuclear fuel cycle enrichment and spent fuel management for nuclear power countries. This presentation will describe how these models are used in analyses to support the Obama Administration's agenda and bilateral/multinational treaties, and ultimately, to reducemore » weapons of mass destruction and terrorism threats through international technical cooperation.« less
Environment, Safety, and Health Self-Assessment Report, Fiscal Year 2008
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chernowski, John
2009-02-27
Lawrence Berkeley National Laboratory's Environment, Safety, and Health (ES&H) Self-Assessment Program ensures that Integrated Safety Management (ISM) is implemented institutionally and by all divisions. The Self-Assessment Program, managed by the Office of Contract Assurance (OCA), provides for an internal evaluation of all ES&H programs and systems at LBNL. The functions of the program are to ensure that work is conducted safely, and with minimal negative impact to workers, the public, and the environment. The Self-Assessment Program is also the mechanism used to institute continuous improvements to the Laboratory's ES&H programs. The program is described in LBNL/PUB 5344, Environment, Safety, andmore » Health Self-Assessment Program and is composed of four distinct assessments: the Division Self-Assessment, the Management of Environment, Safety, and Health (MESH) review, ES&H Technical Assurance, and the Appendix B Self-Assessment. The Division Self-Assessment uses the five core functions and seven guiding principles of ISM as the basis of evaluation. Metrics are created to measure performance in fulfilling ISM core functions and guiding principles, as well as promoting compliance with applicable regulations. The five core functions of ISM are as follows: (1) Define the Scope of Work; (2) Identify and Analyze Hazards; (3) Control the Hazards; (4) Perform the Work; and (5) Feedback and Improvement. The seven guiding principles of ISM are as follows: (1) Line Management Responsibility for ES&H; (2) Clear Roles and Responsibilities; (3) Competence Commensurate with Responsibilities; (4) Balanced Priorities; (5) Identification of ES&H Standards and Requirements; (6) Hazard Controls Tailored to the Work Performed; and (7) Operations Authorization. Performance indicators are developed by consensus with OCA, representatives from each division, and Environment, Health, and Safety (EH&S) Division program managers. Line management of each division performs the Division Self-Assessment annually. The primary focus of the review is workplace safety. The MESH review is an evaluation of division management of ES&H in its research and operations, focusing on implementation and effectiveness of the division's ISM plan. It is a peer review performed by members of the LBNL Safety Review Committee (SRC), with staff support from OCA. Each division receives a MESH review every two to four years, depending on the results of the previous review. The ES&H Technical Assurance Program (TAP) provides the framework for systematic reviews of ES&H programs and processes. The intent of ES&H Technical Assurance assessments is to provide assurance that ES&H programs and processes comply with their guiding regulations, are effective, and are properly implemented by LBNL divisions. The Appendix B Performance Evaluation and Measurement Plan (PEMP) requires that LBNL sustain and enhance the effectiveness of integrated safety, health, and environmental protection through a strong and well-deployed system. Information required for Appendix B is provided by EH&S Division functional managers. The annual Appendix B report is submitted at the close of the fiscal year. This assessment is the Department of Energy's (DOE) primary mechanism for evaluating LBNL's contract performance in ISM.« less
77 FR 43117 - Glen Canyon Dam Adaptive Management Work Group
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... [email protected] . SUPPLEMENTARY INFORMATION: The Glen Canyon Dam Adaptive Management Program (AMP) was...-575) of 1992. The AMP includes a Federal advisory committee, the AMWG, a technical work group (TWG), a... the AMP. To view a copy of the agenda and documents related to the above meeting, please visit...
75 FR 20381 - Glen Canyon Dam Adaptive Management Work Group (AMWG)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-19
... call). SUMMARY: The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of... AMP includes a Federal advisory committee (AMWG), a technical work group (TWG), a monitoring and... visit Reclamation's Web site at: http://www.usbr.gov/uc/rm/amp/amwg/mtgs/10may06CC/index.html...
Modular space station phase B extension program master plan
NASA Technical Reports Server (NTRS)
Munsey, E. H.
1971-01-01
The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.
75 FR 62809 - Transmission Vegetation Management Practices; Notice of Technical Conference
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-13
... the conference is to discuss current vegetation management programs and practices as required under... locating this event in the Calendar. The event will contain a link to the Webcast. The Capitol Connection... for a fee. If you have any questions, visit http://www.CapitolConnection.org or call 703-993-3100...
2002-06-01
time, the monkey would eventually produce the collected works of Shakespeare . Unfortunately for the analogist, systems, even live ones, do not work...limited his simulated computer monkey to producing, in a single random step, the sentence uttered by Polonius in the play Hamlet : “Methinks it is
ERIC Educational Resources Information Center
Emporia State Univ., KS.
This curriculum guide is intended to aid community colleges, area vocational technical schools, and other institutions that provide mid-management educational programs in the state of Kansas to eliminate duplication between various institutions and to provide standard titles and standard content from institution to institution. Following an…
77 FR 74862 - OneCPD Technical Assistance and Capacity Building Needs Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-18
... the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The... programs funded by CPD and enable HUD and the TA provider to better understand the scope of assistance... Desk Officer, Office of Management and Budget, New Executive Office Building, Washington, DC 20503; fax...
Environmental Resource Management Issues in Agronomy: A Lecture/Laboratory Course
ERIC Educational Resources Information Center
Munn, D. A.
2004-01-01
Environmental Sciences Technology T272 is a course with a laboratory addressing problems in soil and water quality and organic wastes utilization to serve students from associate degree programs in laboratory science and environmental resources management at a 2-year technical college. Goals are to build basic lab skills and understand the role…
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less
Pathfinder Technologies Specialist, X-37
NASA Technical Reports Server (NTRS)
French, James R.
2001-01-01
The X-37 is a technology demonstrator sponsored by NASA. It includes a number of experiments both imbedded (i.e., essential aspects of the vehicle) and separate. The technologies demonstrated will be useful in future operational versions as well as having broad applications to other programs. Mr. James R. French, of JRF Engineering Services and as a consultant to SAIC, has provided technical support to the X-37 NASA Program office since the beginning of the program. In providing this service, Mr. French has maintained close contact with the Boeing Seal Beach and Rocketdyne technical teams via telephone, e-mail, and periodic visits. His interfaces were primarily with the working engineers in order to provide NASA sponsors with a different view than that achieved through management channels. Mr. French's periodic and highly detailed technical reports were submitted to NASA and SAIC (Science Applications International Corporation) on a weekly/monthly basis. These reports addressed a wide spectrum of programmatic and technical interests related to the X-37 Program including vehicle design, flight sciences, propulsion, thermal protection, Guidance Navigation & Control (GN&C), structures, and operations. This deliverable is presented as a consolidation of the twelve monthly reports submitted during the Contract's Option Year,
NASA's computer science research program
NASA Technical Reports Server (NTRS)
Larsen, R. L.
1983-01-01
Following a major assessment of NASA's computing technology needs, a new program of computer science research has been initiated by the Agency. The program includes work in concurrent processing, management of large scale scientific databases, software engineering, reliable computing, and artificial intelligence. The program is driven by applications requirements in computational fluid dynamics, image processing, sensor data management, real-time mission control and autonomous systems. It consists of university research, in-house NASA research, and NASA's Research Institute for Advanced Computer Science (RIACS) and Institute for Computer Applications in Science and Engineering (ICASE). The overall goal is to provide the technical foundation within NASA to exploit advancing computing technology in aerospace applications.
Dr. William Tumas - Associate Laboratory Director, Materials and Chemical
Chemical Science and Technology Dr. William Tumas - Associate Laboratory Director, Materials and Chemical , technical direction, and workforce development of the materials and chemical science and technology , program management, and program execution. He joined NREL in December 2009 as Director of the Chemical and
Evaluation Research in Basic Skills with Incarcerated Adults. Technical Report No. 303.
ERIC Educational Resources Information Center
Meyer, Linda A.; And Others
To evaluate the relative effectiveness of traditional versus computer managed instruction (CMI) basic skills programs for incarcerated adults, 359 male inmates from three traditional self-paced and three PLATO/CMI programs were given pretests in the Test of Adult Basic Education (TABE) and the Tennessee Self-Concept Scale (TSCS). Following three…
ERIC Educational Resources Information Center
Foster-Turley, Pat
This discussion paper is intended for policy makers, program managers, technical specialists, and others seeking new tools and ideas with which to achieve environmentally sustainable development. Effective techniques from the field of environmental education and communication (EE&C) that can help biodiversity conservationists and program managers…
Workplace Literacy Programs: A Review of the Literature.
ERIC Educational Resources Information Center
Dunn-Rankin, Patricia; Beil, Drake
This literature review observes that (1) there is an increasing need for enhancing job literacy skills among workers; (2) workplace literacy programs cover both basic literacy and job-related technical training; (3) successful curricula use job-related tasks and materials; and (4) management needs to be heavily involved and committed if a program…
ERIC Educational Resources Information Center
Duncan, Dennis W.; Ricketts, John C.
2008-01-01
The purpose of this study was to determine agriculture teachers' perceived levels of efficacy as they relate to managing the total program of agricultural education, both for traditionally and alternatively certified teachers. The constructs used in this study were technical content, FFA/leadership development/SAE, teaching and learning, and…
Programmatic Knowledge Management: Technology, Literacy, and Access in 21st-Century Writing Programs
ERIC Educational Resources Information Center
York, Eric James
2015-01-01
Growing out of research in Technical Communication, Composition Studies, and Writing Program Administration, the articles in this dissertation explicitly seek to address changes in the practices and products of writing and writing studies wrought by the so-called "digital revolution" in communication technology, which has been ongoing in…
ERIC Educational Resources Information Center
Wang, Margaret C., Ed.
The studies in this monograph are designed to examine the implementation processes of an innovative instructional program and the relationship between the implementation process and the achievement of certain program goals in school settings. The monograph is a contribution to the technical aspects of designing and implementing innovative…
Technical assistance for intensive culture of northern forest types
Timothy G. OKeffe
1977-01-01
During this Bicentennial celebration, it is interesting to note that in America TA programs in forestry have evolved from both a formal and an informal foundation. European foresters, attempting to motivate many small forest landowners to practice more intensive forest management, have learned that incentive and educational TA programs are far more effective than...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... Medicare Advantage and Prescription Drug Program: Part C Explanation of Benefits CFR 422.111(b)(12)'' that... period for the document entitled ``The Medicare Advantage and Prescription Drug Program: Part C Explanation of Benefits CFR 422.111(b)(12).'' There were technical delays with making the information...
Popular Education, Work Training, and the Path to Women's Empowerment in Chile.
ERIC Educational Resources Information Center
Bosch, Anna E.
1998-01-01
Educacion y Trabajo is a Chilean popular education program that provides participants, ages 15-30, with basic technical-skills training, personal-development training (to promote consciousness raising and self-evaluation), on-the-job training, and management training in microenterprises. A study of six female participants showed the program's…
Hazardous Materials Technology: A Community College's Response to a Critical Employment Need.
ERIC Educational Resources Information Center
Friedel, Janice N.; And Others
Studies conducted by the Eastern Iowa Community College District in 1986 revealed a lack of credit programs and curricula for training individuals in the technical aspects of hazardous materials management and need for hazardous materials technicians by local industry. In response, an associate of applied science (AAS) degree program in Hazardous…
The Next Linear Collider Program
. Records including program management records, financial records, technical and R&D data needed to international collaboration including BINP (Protvino), DESY, FNAL, KEK, LAL d'Orsay, MPI (Munich) and SLAC. SLAC scientific records for proper NLC documentation. Both paper and electronic files are archived in conjunction
NASA Technical Reports Server (NTRS)
Fitz, Rhonda; Whitman, Gerek
2016-01-01
Research into complexities of software systems Fault Management (FM) and how architectural design decisions affect safety, preservation of assets, and maintenance of desired system functionality has coalesced into a technical reference (TR) suite that advances the provision of safety and mission assurance. The NASA Independent Verification and Validation (IVV) Program, with Software Assurance Research Program support, extracted FM architectures across the IVV portfolio to evaluate robustness, assess visibility for validation and test, and define software assurance methods applied to the architectures and designs. This investigation spanned IVV projects with seven different primary developers, a wide range of sizes and complexities, and encompassed Deep Space Robotic, Human Spaceflight, and Earth Orbiter mission FM architectures. The initiative continues with an expansion of the TR suite to include Launch Vehicles, adding the benefit of investigating differences intrinsic to model-based FM architectures and insight into complexities of FM within an Agile software development environment, in order to improve awareness of how nontraditional processes affect FM architectural design and system health management.
Ugwoke, Samuel C; Eseadi, Chiedu; Igbokwe, Chima C; Chiaha, Gertrude T U; Nwaubani, Okechukwu O; Orji, Chibueze Tobias; Ugwuanyi, Leonard T; Chukwuma, Ifeoma S; Edikpa, Edith C; Ogakwu, Vera N; Onu, Eucharia A; Agu, Patricia; Nwobi, Ujunwa A; Omeke, Faith; Okeke, Francisca C; Ezema, Rita N; Abugu, Lawretta I
2017-08-01
Stress is the product of how an individual reacts and adapts to the specific demands and threats they encounter while carrying out given tasks. The main purpose of this study was to investigate the effects of a rational-emotive health education intervention (REHEI) on stress management, and irrational beliefs in a sample of technical college teachers in Southeast Nigeria. The study design was a pretest-posttest control group. Repeated measures analysis of variance, paired t test and Mann-Whitney U tests were used to analyze the data collected. The REHEI significantly reduced teacher stress in those teaching staff exposed to the treatment intervention, relative to a waitlist control group. Furthermore, the REHEI program significantly decreased irrational beliefs about teaching in those teaching staff exposed to the treatment intervention compared to a waitlist control group. The REHEI program can be used to coach teachers on how to manage and cope with stress and overcome irrational beliefs in teaching.
RMP Guidance for Chemical Distributors - Appendix C: Technical Assistance
Resources available to assist warehousing facilities include the Office of Emergency Management website, EPCRA/Superfund/RCRA/CAA hotline, OSHA website and documents and training program, and American Institute of Chemical Engineers publications.
California four cities program, 1971 - 1973. [aerospace-to-urban technology application
NASA Technical Reports Server (NTRS)
Macomber, H. L.; Wilson, J. H.
1974-01-01
A pilot project in aerospace-to-urban technology application is reported. Companies assigned senior engineering professionals to serve as Science and Technology Advisors to participating city governments. Technical support was provided by the companies and JPL. The cities, Anaheim, Fresno, Pasadena, and San Hose, California, provided the working environment and general service support. Each city/company team developed and carried out one or more technical or management pilot projects together with a number of less formalized technology efforts and studies. An account and evaluation is provided of the initial two-year phase of the program.
Eletrobras management program in ergonomics: the pursuit of excellence through maturity levels.
Pires, Paulo Roberto de Oliveira Bassil; Rezende, Fagner Fagundes
2012-01-01
Ergonomics for Eletrobras arose from the need in having an environment more suitable to the characteristics and circumstances of employees, in compliance with Regulation Standard no. 17 - Ergonomics (NR17) of the Ministry of Labor and Employment. Being a mixed economy company with regionalized anthropometric characteristics of its employees, the study of ergonomic adjustments and improvement of the concept of Ergonomics were and have been of great importance to the company's production environment. These advances have contributed to the development of specific technical criteria for the purchase of furniture and work tools (accessories), apart from their possible effects on the user. Ergonomics has been perceived as a technical-scientific tool, aimed to study labor interactions, new technologies and specific characteristics of the activities performed. To meet these demands a multidisciplinary Ergonomics Committee was created in Eletrobras, and effectively established the Ergonomics Management Program in the company; This program is marked by well-defined phases with great success in making use of these studies for other types of corporate activities and also facilitating the program control and its maturity levels, even at a business level.
Environmental Science and Research Foundation annual technical report: Calendar year 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morris, R.C.; Blew, R.D.
1997-07-01
This Annual Technical Report describes work conducted for the Department of Energy, Idaho Operations Office (DOE-ID), by the Environmental Science and Research Foundation (Foundation). The Foundation`s mission to DOE-ID provides support in several key areas. The authors conduct an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain, and provide environmental education and support services related to Idaho National Engineering and Environmental Laboratory (INEEL) natural resource issues. Also, the Foundation, with its University Affiliates, conducts ecological and radioecological research in the Idaho National Environmental Research Park. This research benefits major DOE-ID programs includingmore » Waste Management, Environmental Restoration, Spent Nuclear Fuels, and Land Management Issues. The major accomplishments of the Foundation and its University Affiliates during the calendar year 1996 are discussed.« less
Grid-Scale Energy Storage Demonstration of Ancillary Services Using the UltraBattery Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seasholtz, Jeff
2015-08-20
The collaboration described in this document is being done as part of a cooperative research agreement under the Department of Energy’s Smart Grid Demonstration Program. This document represents the Final Technical Performance Report, from July 2012 through April 2015, for the East Penn Manufacturing Smart Grid Program demonstration project. This Smart Grid Demonstration project demonstrates Distributed Energy Storage for Grid Support, in particular the economic and technical viability of a grid-scale, advanced energy storage system using UltraBattery ® technology for frequency regulation ancillary services and demand management services. This project entailed the construction of a dedicated facility on the Eastmore » Penn campus in Lyon Station, PA that is being used as a working demonstration to provide regulation ancillary services to PJM and demand management services to Metropolitan Edison (Met-Ed).« less
An Organization Design for the PERSPAY Consolidated Data Center.
1983-06-01
GENERAL 25 B. PROGRAM DEVELOPMENT 30 C. COMPUTER OPERATIONS 33 D. TECHNICAL SUPPORT BRANCH 36 E. MANAGEMENT OF THE D.P. ORGANIZATION...support, and 4) management , including planning, administration, and control ( Brandon , Norton Gaydasch, Frank). The following list shows the... Management policy on just what the ADP installation is expected to do is an information requirement that must be satisfied in order for the operation to
The RITE Approach to Agile Acquisition
2013-04-01
SSCPAC. He currently provides project management and technical support to the Global Command and Control System–Joint (GCCS-J) Integrated Imagery and...the Strike Planning and Execution Systems Program Office (PMA-281). Boyce has a Bachelor of Science degree in information systems management and is...has since provided dedicated professional service to the USAF, NAVSUP, and SSCPAC. Roussel has a Bachelor of Science degree in management and a Master
Perrin, Karen M; Burke, Somer Goad; O'Connor, Danielle; Walby, Gary; Shippey, Claire; Pitt, Seraphine; McDermott, Robert J; Forthofer, Melinda S
2006-10-26
Disease self-management programs have been a popular approach to reducing morbidity and mortality from chronic disease. Replicating an evidence-based disease management program successfully requires practitioners to ensure fidelity to the original program design. The Florida Health Literacy Study (FHLS) was conducted to investigate the implementation impact of the Pfizer, Inc. Diabetes Mellitus and Hypertension Disease Self-Management Program based on health literacy principles in 14 community health centers in Florida. The intervention components discussed include health educator recruitment and training, patient recruitment, class sessions, utilization of program materials, translation of program manuals, patient retention and follow-up, and technical assistance. This report describes challenges associated with achieving a balance between adaptation for cultural relevance and fidelity when implementing the health education program across clinic sites. This balance was necessary to achieve effectiveness of the disease self-management program. The FHLS program was implemented with a high degree of fidelity to the original design and used original program materials. Adaptations identified as advantageous to program participation are discussed, such as implementing alternate methods for recruiting patients and developing staff incentives for participation. Effective program implementation depends on the talent, skill and willing participation of clinic staff. Program adaptations that conserve staff time and resources and recognize their contribution can increase program effectiveness without jeopardizing its fidelity.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, Garth M.; Saunders, Scott A.
2013-07-01
The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)« less
MSFC Skylab program engineering and integration
NASA Technical Reports Server (NTRS)
1974-01-01
A technical history and managerial critique of the MSFC role in the Skylab program is presented. The George C. Marshall Space Flight Center had primary hardware development responsibility for the Saturn Workshop Modules and many of the designated experiments in addition to the system integration responsibility for the entire Skylab Orbital Cluster. The report also includes recommendations and conclusions applicable to hardware design, test program philosophy and performance, and program management techniques with potential application to future programs.
Program Plan for 2005: NASA Scientific and Technical Information Program
NASA Technical Reports Server (NTRS)
2005-01-01
Throughout 2005 and beyond, NASA will be faced with great challenges and even greater opportunities. Following a period of reevaluation, reinvention, and transformation, we will move rapidly forward to leverage new partnerships, approaches, and technologies that will enhance the way we do business. NASA's Scientific and Technical Information (STI) Program, which functions under the auspices of the Agency's Chief Information Officer (CIO), is an integral part of NASA's future. The program supports the Agency's missions to communicate scientific knowledge and understanding and to help transfer NASA's research and development (R&D) information to the aerospace and academic communities and to the public. The STI Program helps ensure that the Agency will remain at the leading edge of R&D by quickly and efficiently capturing and sharing NASA and worldwide STI to use for problem solving, awareness, and knowledge management and transfer.
1996 DOE technical standards program workshop: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The workshop theme is `The Strategic Standardization Initiative - A Technology Exchange and Global Competitiveness Challenge for DOE.` The workshop goal is to inform the DOE technical standards community of strategic standardization activities taking place in the Department, other Government agencies, standards developing organizations, and industry. Individuals working on technical standards will be challenged to improve cooperation and communications with the involved organizations in response to the initiative. Workshop sessions include presentations by representatives from various Government agencies that focus on coordination among and participation of Government personnel in the voluntary standards process; reports by standards organizations, industry, and DOEmore » representatives on current technology exchange programs; and how the road ahead appears for `information superhighway` standardization. Another session highlights successful standardization case studies selected from several sites across the DOE complex. The workshop concludes with a panel discussion on the goals and objectives of the DOE Technical Standards Program as envisioned by senior DOE management. The annual workshop on technical standards has proven to be an effective medium for communicating information related to standards throughout the DOE community. Technical standards are used to transfer technology and standardize work processes to produce consistent, acceptable results. They provide a practical solution to the Department`s challenge to protect the environment and the health and safety of the public and workers during all facility operations. Through standards, the technologies of industries and governments worldwide are available to DOE. The DOE Technical Standards Program, a Department-wide effort that crosscuts all organizations and disciplines, links the Department to those technologies.« less
Forum on Workforce Development
NASA Technical Reports Server (NTRS)
Hoffman, Edward
2010-01-01
APPEL Mission: To support NASA's mission by promoting individual, team, and organizational excellence in program/project management and engineering through the application of learning strategies, methods, models, and tools. Goals: a) Provide a common frame of reference for NASA s technical workforce. b) Provide and enhance critical job skills. c) Support engineering, program and project teams. d) Promote organizational learning across the agency. e) Supplement formal educational programs.
ERIC Educational Resources Information Center
Schultz, Tom; And Others
An era of substantial growth in investment of resources, program development, and research has led to tangible gains in the scope and quality of early childhood education programs. However, the system of early childhood education programs is plagued by unequal access and inconsistent, inadequate levels of quality. Additionally, the focus of…
Program for advanced study in public science policy and administration
NASA Technical Reports Server (NTRS)
Rosenthal, A. H.
1976-01-01
The results and conclusions of the six-year effort concerned with the development and implementation of a university educational program intended to prepare scientists and engineers for upper-level management and administrative positions (as distinct from senior technical positions) were presented. This interdisciplinary program is at the graduate level, leading to a Master of Arts degree, and is given within a Division of Public Administration.
Cooperative Fish and Wildlife Research Units - A model partnership program
Dennerline, Donald E.; Childs, Dawn E.
2017-04-20
The U.S. Geological Survey (USGS) Cooperative Fish and Wildlife Research Units (CRU) program is a unique model of cooperative partnership among the USGS, other U.S. Department of the Interior and Federal agencies, universities, State fish and wildlife agencies, and the Wildlife Management Institute. These partnerships are maintained as one of the USGS’s strongest links to Federal and State land and natural resource management agencies.Established in 1935 to meet the need for trained professionals in the growing field of wildlife management, the program currently consists of 40 Cooperative Fish and Wildlife Research Units located on university campuses in 38 States and supports 119 research scientist positions when fully funded. The threefold mission of the CRU program is to (1) conduct scientific research for the management of fish, wildlife, and other natural resources; (2) provide technical assistance to natural resource managers in the application of scientific information to natural resource policy and management; and (3) train future natural resource professionals.
Engineering directorate technical facilities catalog
NASA Technical Reports Server (NTRS)
Maloy, Joseph E.
1993-01-01
The Engineering Directorate Technical Facilities Catalog is designed to provide an overview of the technical facilities available within the Engineering Directorate at the National Aeronautics and Space Administration (NASA), Lyndon B. Johnson Space Center (JSC) in Houston, Texas. The combined capabilities of these engineering facilities are essential elements of overall JSC capabilities required to manage and perform major NASA engineering programs. The facilities are grouped in the text by chapter according to the JSC division responsible for operation of the facility. This catalog updates the facility descriptions for the JSC Engineering Directorate Technical Facilities Catalog, JSC 19295 (August 1989), and supersedes the Engineering Directorate, Principle test and Development Facilities, JSC, 19962 (November 1984).
Mannella, Paolo; Palla, Giulia; Cuttano, Armando; Boldrini, Antonio; Simoncini, Tommaso
2016-12-01
To determine the effect of a simulation training program for residents in obstetrics and gynecology in terms of technical and nontechnical skills for the management of shoulder dystocia. A prospective study was performed at a center in Italy in April-May 2015. Thirty-two obstetrics and gynecology residents were divided into two groups. Residents in the control group were immediately exposed to an emergency shoulder dystocia scenario, whereas those in the simulation group completed a 2-hour training session with the simulator before being exposed to the scenario. After 8weeks, the residents were again exposed to the shoulder dystocia scenario and reassessed. Participants were scored on their demonstration of technical and nontechnical skills. In the first set of scenarios, the mean score was higher in the simulation group than the control group in terms of both technical skills (P=0.008) and nontechnical skills (P<0.001). This difference was retained after 8weeks. High-fidelity simulation programs could be used for the training of residents in obstetrics and gynecology to diagnose and manage obstetric emergencies such as shoulder dystocia. Copyright © 2016 International Federation of Gynecology and Obstetrics. Published by Elsevier Ireland Ltd. All rights reserved.
2014 Wind Program Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
The Wind Program Peer Review Meeting was held March 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department, National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of Wind Program funded projects, as well as the productivity and management effectiveness of the Wind Program itself.
NASA Technical Reports Server (NTRS)
1976-01-01
Safety management areas of concern include the space shuttle main engine, shuttle avionics, orbiter thermal protection system, the external tank program, and the solid rocket booster program. The ground test program and ground support equipment system were reviewed. Systems integration and technical 'conscience' were of major priorities for the investigating teams.
Saudi Arabia's experience in solar energy applications
NASA Astrophysics Data System (ADS)
Huraib, Fahad S.
The progress in solar energy research in Saudi Arabia is discussed with emphasis on the efforts of a government research entity - King Adbulaziz City for Science and Technology (KACST). Three programs currently underway at KACST are considered: the continuation of activities initiated under the Solar Energy Research American/Saudi (SOLERAS) program, a Saudi/German program, and projects developed and conducted completely by KACST. The objectives, management structure, and program organization of SOLEARS are outlined, and attention is focused on urban, rural/agricultural, and industrial applications as well as resource development activities and accomplishments. Solar-hydrogen projects pursued together with Germany are reviewed, and their objectives, program management, and technical plans are covered. Domestic programs dealing with photovoltaic-powered lightning and hot-water systems are summarized.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schroeder, P.R.; Gibson, A.C.; Dardeau, E.A.
This technical note has a twofold purpose: to describe a technique for comparing the predicted quality of surface runoff from confined dredged material disposal areas with applicable water quality standards and to document a computer program called RUNQUAL, written for that purpose as a part of the Automated Dredging and Disposal Alternatives Management System (ADDAMS).
Managing the TDM process : developing MPO institutional capacity - technical report.
DOT National Transportation Integrated Search
2015-04-01
Within Texas, the development of urban travel demand models (TDMs) is a cooperative process between the : Texas Department of Transportation and Metropolitan Planning Organizations (MPOs). Though TxDOT-Transportation Planning and Programming Division...
78 FR 40760 - 60-Day Notice of Proposed Information Collection: Training Evaluation Form
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
... Indian Housing, HUD. ACTION: Notice. SUMMARY: HUD is seeking approval from the Office of Management and... instrument to evaluate learners' reactions to training or technical assistance programs. With the information...
GREMEX- GODDARD RESEARCH AND ENGINEERING MANAGEMENT EXERCISE SIMULATION SYSTEM
NASA Technical Reports Server (NTRS)
Vaccaro, M. J.
1994-01-01
GREMEX is a man-machine management simulation game of a research and development project. It can be used to depict a project from just after the development of the project plan through the final construction phase. The GREMEX computer programs are basically a program evaluation and review technique (PERT) reporting system. In the usual PERT program, the operator inputs each month the amount of work performed on each activity and the computer does the bookkeeping to determine the expected completion date of the project. GREMEX automatically assumes that all activities due to be worked in the current month will be worked. GREMEX predicts new durations (and costs) each month based on management actions taken by the players and the contractor's abilities. Each activity is assigned the usual cost and duration estimates but must also be assigned three parameters that relate to the probability that the time estimate is correct, the probability that the cost estimate is correct, and the probability of technical success. Management actions usually can be expected to change these probabilities. For example, use of overtime or double shifts in research and development work will decrease duration and increase cost by known proportions and will also decrease the probability of technical success due to an increase in the likelihood of accidents or mistakes. These re-estimating future events and assigning probability factors provides life to the model. GREMEX is not a production job for project management. GREMEX is a game that can be used to train management personnel in the administration of research and development type projects. GREMEX poses no 'best way' to manage a project. The emphasis of GREMEX is to expose participants to many of the factors involved in decision making when managing a project in a government research and development environment. A management team can win the game by surpassing cost, schedule, and technical performance goals established when the simulation began. The serious management experimenter can use GREMEX to explore the results of management methods they could not risk in real life. GREMEX can operate with any research and development type project with up to 15 subcontractors and produces reports simulating monthly or quarterly updates of the project PERT network. Included with the program is a data deck for simulation of a fictitious spacecraft project. Instructions for substituting other projects are also included. GREMEX is written in FORTRAN IV for execution in the batch mode and has been implemented on an IBM 360 with a central memory requirement of approximately 350K (decimal) of 8 bit bytes. The GREMEX system was developed in 1973.
Simulation Based Training Improves Airway Management for Helicopter EMS Teams
NASA Technical Reports Server (NTRS)
Dhindsa, Harinder S.; Reid, Renee; Murray, David; Lovelady, James; Powell, Katie; Sayles, Jeff; Stevenson, Christopher; Baker, Kathy; Solada, Brian; Carroll, Scott;
2011-01-01
The use of paralytic medications in the performance of RSI intubation is a high risk intervention used by many HEMS crews. There is no margin for error in RSI intubation as the results can be fatal. Operating room access for airway management training has become more difficult, and is not representative of the environment in which HEMS crews typically function. LifeEvac of Virginia designed and implemented an SST airway management program to provide a realistic, consistent training platform. The dynamic program incorporates standardized scenarios, and real life challenging cases that this and other programs have encountered. SST is done in a variety of settings including the helicopter, back of ambulances, staged car crashes and simulation centers. The result has been the indoctrination of a well defined, consistent approach to every airway management intervention. The SST program facillitates enhancement of technical skills. as well as team dynamics and communication.
Integrated Risk and Knowledge Management Program -- IRKM-P
NASA Technical Reports Server (NTRS)
Lengyel, David M.
2009-01-01
The NASA Exploration Systems Mission Directorate (ESMD) IRKM-P tightly couples risk management and knowledge management processes and tools to produce an effective "modern" work environment. IRKM-P objectives include: (1) to learn lessons from past and current programs (Apollo, Space Shuttle, and the International Space Station); (2) to generate and share new engineering design, operations, and management best practices through preexisting Continuous Risk Management (CRM) procedures and knowledge-management practices; and (3) to infuse those lessons and best practices into current activities. The conceptual framework of the IRKM-P is based on the assumption that risks highlight potential knowledge gaps that might be mitigated through one or more knowledge management practices or artifacts. These same risks also serve as cues for collection of knowledge particularly, knowledge of technical or programmatic challenges that might recur.
ERIC Educational Resources Information Center
Burke, William P.
A project was conducted to evaluate the effectiveness of the stress-management training given to students in the jumpmaster training course at Fort Benning, Georgia. The course, which trains airborne personnel to conduct landings of men and equipment, features relatively stressful training programs during which instructors grade the performance of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-04
... . SUPPLEMENTARY INFORMATION: The Glen Canyon Dam Adaptive Management Program (AMP) was implemented as a result of... AMP includes a Federal advisory committee, the AMWG, a technical work group (TWG), a Grand Canyon... other administrative and resource issues pertaining to the AMP. To view a copy of the agenda and...
Integrated Project Management: A Case Study in Integrating Cost, Schedule, Technical, and Risk Areas
NASA Technical Reports Server (NTRS)
Smith, Greg
2004-01-01
This viewgraph presentation describes a case study as a model for integrated project management. The ISS Program Office (ISSPO) developed replacement fluid filtration cartridges in house for the International Space Station (ISS). The presentation includes a step-by-step procedure and organizational charts for how the fluid filtration problem was approached.
Classroom Management Competencies of Intern-Teachers in Nigeria Secondary Schools
ERIC Educational Resources Information Center
Ikoya, Peter Onotevure; Akinseinde, Samuel I.
2010-01-01
The purpose of the study was to find out the adequacy of the current classroom management training program for intern teachers in Nigerian Universities. Two hundred and six respondents were used for the study. A structured questionnaire was administered to seventy males and one hundred and thirty-six females drawn from Arts, Science, Technical and…
Expectations and outcome skills of a generalist health care administrator.
Jones, V B; Taylor, L C
1990-01-01
The question of the degree of technical versus managerial competence to be found in future graduates from health administration programs is not easily resolved. In the HIMSS 1988 survey of CIOs the attributes needed for success are listed in descending rank order as follows: leadership ability, vision/imagination, knowledge of hospital systems, business acumen, decisiveness, and technical competence. CIOs ranked technical competence as less important than other attributes associated with general management success. The expectations for attitudes, knowledge, and skills presented in this article support the greater importance of management abilities relative to pure technical competence. However, it is vital that an appropriate level of technical knowledge and skill be maintained to enable future alumni of health administration programs to function effectively as administrators. Depending on their role in a health care organization, greater or lesser technical knowledge may be needed. Those pursuing a career path toward CIO must, of necessity, have greater technical knowledge and skill. We have discussed necessary and expected attitudes, knowledge, and skills that will be needed by the generalist health administration graduate in the future. It will be important to develop and maintain an attitude that MIS is a strategic tool, that health care technology is a corporate asset, and that information is power. Graduates must recognize the necessity of maintaining and enhancing their knowledge and skills through continuing education. The knowledge base of MIS education should focus on determining information needs to support strategic goals, understanding of general systems theory, principles of systems analysis, design, implementation and maintenance, awareness and exposure to standard application software, and an awareness of external sources of data.(ABSTRACT TRUNCATED AT 250 WORDS)
Total Quality Leadership Knowledge, Skills, and Abilities for Surface Warfare Officers
1994-03-01
Leadership Management Training (LMT), continued. The senior enlisted and junior officers received the training, though the course content differed...designed blueprint for the development of the 9 Leadership , Management , Education, and Training program (LMET). (Ref. 6: p. 201] In 1976, the Navy...placing a greater emphasis on leadership , management , and HRM and down-playing the role of technical training. This continuum would consolidate the more
The Use of Computers as a Design Tool.
1980-01-01
design programs for the technical management of complex fighter development projects. AIAA Paper No. 70-364, March 1970 22. J. Kondo: Application of...the scope and effectiveness of their use are sometimes considered suspect, especially by managers and decision makers who must depend, to some...uncertainty and the fact that the measured and calculated data cannot be easily combined often leave the project manager or designer SPIRAL PORTION
Choice modeling: public preferences for enhancing benefits from private forests in the Adirondacks
Donald F. Dennis; Mark J. Twery
2007-01-01
Recognizing the importance of private land in meeting society's needs for forest-related benefits, public agencies fund programs that provide aid to private landowners to enhance public benefits derived from these lands. This may include technical help, education, tax incentives, and cost-share programs for various management activities. It is important that...
Introduction to: The Forest Health monitoring program
Barbara L. Conkling
2011-01-01
The National Forest Health Monitoring (FHM) Program of the Forest Service, U.S. Department of Agriculture, produces an annual technical report on forest health as one of its products. The report is organized using the Criteria and Indicators for the Conservation and Sustainable Management of Temperate and Boreal Forests (Montréal Process Working Group 2007) as a...
Evaluating the forest stewardship program through a national survey of participants
J.D. Esseks; R.J. Moulton
2000-01-01
This paper reports findings from a national survey of 1,231 participants in the Forest Stewardship Program (FSP) of USDA's Forest Service. Launched in 1991, the FSP provides technical assistance through state forestry agencies to help landowners develop management plans for their non-industrial forestland. The survey allowed us to address five main evaluative...
Analysis of structural dynamic data from Skylab. Volume 1: Technical discussion
NASA Technical Reports Server (NTRS)
Demchak, L.; Harcrow, H.
1976-01-01
A compendium of Skylab structural dynamics analytical and test programs is presented. These programs are assessed to identify lessons learned from the structural dynamic prediction effort and to provide guidelines for future analysts and program managers of complex spacecraft systems. It is a synopsis of the structural dynamic effort performed under the Skylab Integration contract and specifically covers the development, utilization, and correlation of Skylab Dynamic Orbital Models.
Aeronautical Systems Division (AFSC) Program Management Resource Document.
1981-09-30
assure that the detail desing adeuately satisfies the requirements contained in the Part I Development Specifications and to allow the PM to formally...disciplines. He becomes a source of integrated information concerning a particular program and an interaction point for coordinating the di- verse...consider cost, schedule, and technical factors not only individually, but also their interaction on each other (5 60). The fact that a program has
Development of Integrated Programs for Aerospace-vehicle design (IPAD): Reference design process
NASA Technical Reports Server (NTRS)
Meyer, D. D.
1979-01-01
The airplane design process and its interfaces with manufacturing and customer operations are documented to be used as criteria for the development of integrated programs for the analysis, design, and testing of aerospace vehicles. Topics cover: design process management, general purpose support requirements, design networks, and technical program elements. Design activity sequences are given for both supersonic and subsonic commercial transports, naval hydrofoils, and military aircraft.
Low-Cost, Net-Shape Ceramic Radial Turbine Program
1985-05-01
PROGRAM ELEMENT. PROJECT. TASK Garrett Turbine Engine Company AE OKUI UBR 111 South 34th Street, P.O. Box 2517 Phoenix, Arizona 85010 %I. CONTROLLING...processing iterations. Program management and materials characterization were conducted at Garrett Turbine Engine Company (GTEC), test bar and rotor...automotive gas turbine engine rotor development efforts at ACC. xvii PREFACE This is the final technical report of the Low-Cost, Net- Shape Ceramic
High Power Magnetohydrodynamic System
1978-07-01
AFAPL/POD as the Program Manager. Dr. Daniel W. Swallom and Dr. Otto K. Sonju of Maxwell Laboratories, Inc. were responsible for the technical work. The...fabricated and tested. Figure 1 shows this hardware installed at the Santa Susana Field Laboratory (SSFL) for develop- ment testing. The cooled wall...development test program was conducted at Santa Susana Field Laboratory (SSFL) and a performance test program is to be conducted at AEDC. AEDC is to
Environmental Management Science Program Workshop. Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1998-07-01
The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as thatmore » performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.« less
[In search of results of technical cooperation].
Jourdan Hidalgo, L; Manuel Sotelo, J
1999-06-01
For the Pan American Health Organization (PAHO), technical cooperation (TC) is the process by which the PAHO Member States work with the Organization, as equal partners, to identify and reach their own health goals and to promote self-sufficiency in health development, through programs that respond to those countries' needs and national priorities. Since 1978, PAHO has used the American Regional Planning, Programming, Monitoring, and Evaluation System (AMPES) to establish management procedures and to facilitate decision-making in health TC. As part of AMPES, PAHO uses a "logical approach to project management" to structure the work program of the Organization and to identify the expected results from TC activities and TC resource investments. This project management approach, which replaces the "functional approaches" system used to date, also helps establish a causative relationship between the programmed activities and the results that PAHO expects, and between the activities and the hoped-for outcomes in the countries. As part of an ongoing process of rethinking international health TC, several years ago PAHO began a four-phase study on the usefulness and validity of functional approaches and on the need to propose new ones or to modify existing ones. The results of the initial phase showed it was difficult to classify the activities because the functional-approaches categories were not mutually exclusive and the TC activities were complex. Further, the expected results did not specify the product for which the PAHO Secretariat was accountable within a certain time frame nor the Secretariat's level of responsibility. Thus, a new and more flexible classification of expected results was proposed, with the following categories: cooperation networks and alliances; surveillance and information systems; standards and guidelines; research and evaluation studies; plans, projects, and policies; methods, models, and technologies; training programs; promotional campaigns and advocacy; and direct support. In the second phase of the study, it was concluded that the proposed classification system made it possible to more precisely identify the products of PAHO technical cooperation projects, the Organization's degree of responsibility, and the bases for estimating needed resources. The new system could also facilitate monitoring and evaluation. In addition, the third phase of analyzing the functional approaches has begun. Its objective is to evaluate the effect of technical cooperation based on the changes incorporated in the programming of activities.
20 CFR 637.230 - Use of incentive bonuses.
Code of Federal Regulations, 2010 CFR
2010-04-01
... in paragraph (d) of this section, technical assistance, data and information collection and compilation, management information systems, post-program followup activities, and research and evaluation... information collection and compilation, recordkeeping, or the preparation of applications for incentive...
General RMP Guidance - Appendix C: Technical Assistance
Contacts for resources available to facilities in complying with 40 CFR part 68 (risk management program) include Office of Emergency Prevention Preparedness and Response, EPCRA/Superfund/RCRA/CAA Call Center, and the Center for Chemical Process Safety.
Hazardous waste management at the local level; The Anchorage, Alaska experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wigglesworth, D.
1989-07-01
The need to manage hazardous wastes in the municipality of Anchorage, Alaska, has become increasingly evident in recent years. A task force, representing a broad cross-section of the community, was appointed by the mayor to develop a waste management plan that would address community concerns. Between 1984 and 1986, the Anchorage Hazardous Waste Task Force, supported by municipal staff, local consultants and volunteers from the community developed a plan emphasizing local responsibility and pollution prevention, using management capabilities and technical assistance. This paper describes the development of a non-regulatory hazardous waste management program in Anchorage, Alaska. Plan elements, program fundingmore » and the key role of the local Hazardous Waste Task Force are discussed.« less
Technical area status report for waste destruction and stabilization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dalton, J.D.; Harris, T.L.; DeWitt, L.M.
1993-08-01
The Office of Environmental Restoration and Waste Management (EM) was established by the Department of Energy (DOE) to direct and coordinate waste management and site remediation programs/activities throughout the DOE complex. In order to successfully achieve the goal of properly managing waste and the cleanup of the DOE sites, the EM was divided into five organizations: the Office of Planning and Resource Management (EM-10); the Office of Environmental Quality Assurance and Resource Management (EM-20); the Office of Waste Operations (EM-30); the Office of Environmental Restoration (EM-40); and the Office of Technology and Development (EM-50). The mission of the Office ofmore » Technology Development (OTD) is to develop treatment technologies for DOE`s operational and environmental restoration wastes where current treatment technologies are inadequate or not available. The Mixed Waste Integrated Program (MWIP) was created by OTD to assist in the development of treatment technologies for the DOE mixed low-level wastes (MLLW). The MWIP has established five Technical Support Groups (TSGs) whose purpose is to identify, evaluate, and develop treatment technologies within five general technical areas representing waste treatment functions from initial waste handling through generation of final waste forms. These TSGs are: (1) Front-End Waste Handling, (2) Physical/Chemical Treatment, (3) Waste Destruction and Stabilization, (4) Second-Stage Destruction and Offgas Treatment, and (5) Final Waste Forms. This report describes the functions of the Waste Destruction and Stabilization (WDS) group. Specifically, the following items are discussed: DOE waste stream identification; summary of previous efforts; summary of WDS treatment technologies; currently funded WDS activities; and recommendations for future activities.« less
The Glen Canyon Dam Adaptive Management Program: An experiment in science-based resource management
NASA Astrophysics Data System (ADS)
kaplinski, m
2001-12-01
In 1996, Glen Canyon Dam Adaptive Management (GCDAMP) program was established to provide input on Glen Canyon Dam operations and their affect on the Colorado Ecosystem in Grand Canyon. The GCDAMP is a bold experiment in federal resource management that features a governing partnership with all relevant stakeholders sitting at the same table. It is a complicated, difficult process where stakeholder-derived management actions must balance resource protection with water and power delivery compacts, the Endangered Species Act, the National Historical Preservation Act, the Grand Canyon Protection Act, National Park Service Policy, and other stakeholder concerns. The program consists of four entities: the Adaptive Management Workgroup (AMWG), the Technical Workgroup (TWG), the Grand Canyon Monitoring and Research Center (GCMRC), and independent review panels. The AMWG and TWG are federal advisory committees that consists of federal and state resource managers, Native American tribes, power, environmental and recreation interests. The AMWG is develops, evaluates and recommends alternative dam operations to the Secretary. The TWG translates AMWG policy and goals into management objectives and information needs, provides questions that serve as the basis for long-term monitoring and research activities, interprets research results from the GCMRC, and prepares reports as required for the AMWG. The GCMRC is an independent science center that is responsible for all GCDAMP monitoring and research activities. The GCMRC utilizes proposal requests with external peer review and an in-house staff that directs and synthesizes monitoring and research results. The GCMRC meets regularly with the TWG and AMWG and provides scientific information on the consequences of GCDAMP actions. Independent review panels consist of external peer review panels that provide reviews of scientific activities and the program in general, technical advice to the GCMRC, TWG and AMWG, and play a critical balancing role to ensure overall scientific credibility to the program. Many lessons have been learned and many challenges remain. Incorporation of social issues such as recreation experience and non-use economic valuation has been especially difficult and not entirely satisfactory to many stakeholders. Adaptive management can be frustrating and a fragile spirit of cooperation exists between stakeholders with opposing interests. Communication and flexibility is the key to program success. Scientific results need to be clearly stated to keep results relevant to managers, and managers must embrace the uncertainty of scientific endeavors. Managers must remain flexible in creating and revising program goals and objectives to incorporate new scientific results into meaningful management strategies.
Management Practices and Tools: 2000-2004
NASA Technical Reports Server (NTRS)
2004-01-01
This custom bibliography from the NASA Scientific and Technical Information Program lists a sampling of records found in the NASA Aeronautics and Space Database. The scope of this topic is divided into four parts and covers the adoption of proven personnel and management reforms to implement the national space exploration vision, including the use of "system-of-systems" approach; policies of spiral, evolutionary development; reliance upon lead systems integrators; and independent technical and cost assessments. This area of focus is one of the enabling technologies as defined by NASA s Report of the President s Commission on Implementation of United States Space Exploration Policy, published in June 2004.
Industrial demand side management: A status report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hopkins, M.F.; Conger, R.L.; Foley, T.J.
This report provides an overview of and rationale for industrial demand side management (DSM) programs. Benefits and barriers are described, and data from the Manufacturing Energy Consumption Survey are used to estimate potential energy savings in kilowatt hours. The report presents types and examples of programs and explores elements of successful programs. Two in-depth case studies (from Boise Cascade and Eli Lilly and Company) illustrate two types of effective DSM programs. Interviews with staff from state public utility commissions indicate the current thinking about the status and future of industrial DSM programs. A comprehensive bibliography is included, technical assistance programsmore » are listed and described, and a methodology for evaluating potential or actual savings from projects is delineated.« less
Fossil energy waste management. Technology status report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bossart, S.J.; Newman, D.A.
1995-02-01
This report describes the current status and recent accomplishments of the Fossil Energy Waste Management (FE WM) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Waste Management Program is to identify and develop optimal strategies to manage solid by-products from advanced coal technologies for the purpose of ensuring the competitiveness of advanced coal technologies as a future energy source. The projects in the Fossil Energy Waste Management Program are divided into three types of activities: Waste Characterization, Disposal Technologies, and Utilization Technologies. This technology status report includesmore » a discussion on barriers to increased use of coal by-products. Also, the major technical and nontechnical challenges currently being addressed by the FE WM program are discussed. A bibliography of 96 citations and a list of project contacts is included if the reader is interested in obtaining additional information about the FE WM program.« less
Solid Waste Management in Nigeria: Problems and Issues.
AGUNWAMBA
1998-11-01
/ This paper is a presentation of the problems of solid waste management in Nigeria and certain important issues that must be addressed in order to achieve success. At the core of the problems of solid waste management are the absence of adequate policies, enabling legislation, and an environmentally stimulated and enlightened public. Government policies on the environment are piecemeal where they exist and are poorly implemented. Public enlightenment programs lacked the needed coverage, intensity, and continuity to correct the apathetic public attitude towards the environment. Up to now the activities of the state environmental agencies have been hampered by poor funding, inadequate facilities and human resources, inappropriate technology, and an inequitable taxation system. Successful solid waste management in Nigeria will require a holistic program that will integrate all the technical, economic, social, cultural, and psychological factors that are often ignored in solid waste programs.KEY WORDS: Solid waste; Management; Problems; Solutions; Nigeria
The importance of scientific literacy to OCRWM's mission
DOE Office of Scientific and Technical Information (OSTI.GOV)
King, G.P.
1990-01-01
The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (CRWM) has the unique mission of finding a permanent solution to the nation's high-level radioactive waste management problems. This paper explores a vital question: will OCRWM have sufficient scientific and technical resources as well as a sufficient level of public support to carry out its mission An affirmative answer to this question will require that adequate numbers of science and engineering students enter the field of radioactive waste management and that overall scientific literacy also be enhanced. This paper outlines current activities and programs within DOE and OCRWMmore » to increase scientific literacy and to recruit and develop scientists and engineers. While this paper offers only a summary inspection of the issues surrounding the solution of developing and maintaining the human technical capabilities to carry forth OCRWM's mission, it is meant to initiate a continuing examination by the American Nuclear Society, DOE, and professional and technical societies of fundamental scientific education issues.« less
Management: A continuing literature survey with indexes, March 1976
NASA Technical Reports Server (NTRS)
1976-01-01
Management is a compilation of references to selected reports, journal articles, and other documents on the subject of management. This publication lists 368 documents originally announced in the 1975 issues of Scientific and Technical Aerospace Reports (STAR) or International Aerospace Abstracts (IAA). It includes references on the management of research and development, contracts, production, logistics, personnel, safety, reliability and quality control. It also includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.
NASA Astrophysics Data System (ADS)
Zakharova, Alexandra A.; Kolegova, Olga A.; Nekrasova, Maria E.
2016-04-01
The paper deals with the issues in program management used for engineering innovative products. The existing project management tools were analyzed. The aim is to develop a decision support system that takes into account the features of program management used for high-tech products: research intensity, a high level of technical risks, unpredictable results due to the impact of various external factors, availability of several implementing agencies. The need for involving experts and using intelligent techniques for information processing is demonstrated. A conceptual model of common information space to support communication between members of the collaboration on high-tech programs has been developed. The structure and objectives of the information analysis system “Geokhod” were formulated with the purpose to implement the conceptual model of common information space in the program “Development and production of new class mining equipment - “Geokhod”.
Space station pressurized laboratory safety guidelines
NASA Technical Reports Server (NTRS)
Mcgonigal, Les
1990-01-01
Before technical safety guidelines and requirements are established, a common understanding of their origin and importance must be shared between Space Station Program Management, the User Community, and the Safety organizations involved. Safety guidelines and requirements are driven by the nature of the experiments, and the degree of crew interaction. Hazard identification; development of technical safety requirements; operating procedures and constraints; provision of training and education; conduct of reviews and evaluations; and emergency preplanning are briefly discussed.
Safety management vs. picking leaves.
Wright, D
1991-09-01
A safety program will generally have as its base a comprehensive written document made available for everyone in the organization. The document should indicate a positive commitment to safety by management. It should not be a "how to" guide, but rather a broad outline to establish responsibilities, goals, and methods. The safety manager is appointed in writing and answers to the highest level of management. As opposed to a "doer," the safety manager acts as a director and administrator of the safety program. This is accomplished through the advisory capacity of the safety program for solicited and unsolicited problems. The focus of the safety manager is on the system and how it contributes to safety problems, rather than individual problems. Management has the ultimate responsibility for safety. Their efforts should reflect a proactive attitude to correct problems in the system. In order to identify areas of interest, technically competent input from the safety manager should be required. The support of the safety program by top management determines the success of the program. Without a clear and firm commitment by the organization, safety will receive no more than lip service from the employees. The benefits of a proactive approach will be realized in the organization's ability to manage safety issues, rather than reacting to them.
An Effective Health and Medical Technical Authority
NASA Technical Reports Server (NTRS)
Fogarty, Jennifer A.
2009-01-01
The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that risk acceptance and risk trades will be acknowledged and sanctioned at the highest appropriate level; this includes Program Managers, Mission Directorate Associate Administrators and the Agency Administrator.
Rani, Manju; Nusrat, Sharmin; Hawken, Laura H
2012-10-16
Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.
2012-01-01
Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232
Perrin, Karen M; Burke, Somer Goad; O'Connor, Danielle; Walby, Gary; Shippey, Claire; Pitt, Seraphine; McDermott, Robert J; Forthofer, Melinda S
2006-01-01
Background and objectives Disease self-management programs have been a popular approach to reducing morbidity and mortality from chronic disease. Replicating an evidence-based disease management program successfully requires practitioners to ensure fidelity to the original program design. Methods The Florida Health Literacy Study (FHLS) was conducted to investigate the implementation impact of the Pfizer, Inc. Diabetes Mellitus and Hypertension Disease Self-Management Program based on health literacy principles in 14 community health centers in Florida. The intervention components discussed include health educator recruitment and training, patient recruitment, class sessions, utilization of program materials, translation of program manuals, patient retention and follow-up, and technical assistance. Results This report describes challenges associated with achieving a balance between adaptation for cultural relevance and fidelity when implementing the health education program across clinic sites. This balance was necessary to achieve effectiveness of the disease self-management program. The FHLS program was implemented with a high degree of fidelity to the original design and used original program materials. Adaptations identified as advantageous to program participation are discussed, such as implementing alternate methods for recruiting patients and developing staff incentives for participation. Conclusion Effective program implementation depends on the talent, skill and willing participation of clinic staff. Program adaptations that conserve staff time and resources and recognize their contribution can increase program effectiveness without jeopardizing its fidelity. PMID:17067388
Engineering Technical Support Center Annual Report Fiscal ...
The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol
Evaluating disease management program effectiveness: an introduction to time-series analysis.
Linden, Ariel; Adams, John L; Roberts, Nancy
2003-01-01
Currently, the most widely used method in the disease management (DM) industry for evaluating program effectiveness is referred to as the "total population approach." This model is a pretest-posttest design, with the most basic limitation being that without a control group, there may be sources of bias and/or competing extraneous confounding factors that offer a plausible rationale explaining the change from baseline. Furthermore, with the current inclination of DM programs to use financial indicators rather than program-specific utilization indicators as the principal measure of program success, additional biases are introduced that may cloud evaluation results. This paper presents a non-technical introduction to time-series analysis (using disease-specific utilization measures) as an alternative, and more appropriate, approach to evaluating DM program effectiveness than the current total population approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-12-01
The results of the system definition studies conducted by NASA as a part of the Department of Energy/National Aeronautics and Space Administration SPS Concept Development and Evaluation Program are summarized. The purpose of the system definition efforts was to identify and define candidate SPS concepts and to evaluate the concepts in terms of technical and cost factors. Although the system definition efforts consisted primarily of evaluation and assessment of alternative technical approaches, a reference system was also defined to facilitate economic, environmental, and societal assessments by the Department of Energy. This reference system was designed to deliver 5 GW ofmore » electrical power to the utility grid. Topics covered include system definition; energy conversion and power management; power transmission and reception; structures, controls, and materials; construction and operations; and space transportation.« less
Annual Report: Photovoltaic Subcontract Program FY 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Summers, K. A.
1991-03-01
This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less
Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho
Packard, F.A.
1996-01-01
To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.
NASA Space Environments Technical Discipline Team Space Weather Activities
NASA Astrophysics Data System (ADS)
Minow, J. I.; Nicholas, A. C.; Parker, L. N.; Xapsos, M.; Walker, P. W.; Stauffer, C.
2017-12-01
The Space Environment Technical Discipline Team (TDT) is a technical organization led by NASA's Technical Fellow for Space Environments that supports NASA's Office of the Chief Engineer through the NASA Engineering and Safety Center. The Space Environments TDT conducts independent technical assessments related to the space environment and space weather impacts on spacecraft for NASA programs and provides technical expertise to NASA management and programs where required. This presentation will highlight the status of applied space weather activities within the Space Environment TDT that support development of operational space weather applications and a better understanding of the impacts of space weather on space systems. We will first discuss a tool that has been developed for evaluating space weather launch constraints that are used to protect launch vehicles from hazardous space weather. We then describe an effort to better characterize three-dimensional radiation transport for CubeSat spacecraft and processing of micro-dosimeter data from the International Space Station which the team plans to make available to the space science community. Finally, we will conclude with a quick description of an effort to maintain access to the real-time solar wind data provided by the Advanced Composition Explorer satellite at the Sun-Earth L1 point.
Space Station Information Systems
NASA Technical Reports Server (NTRS)
Pittman, Clarence W.
1988-01-01
The utility of the Space Station is improved, the ability to manage and integrate its development and operation enhanced, and the cost and risk of developing the software for it is minimized by three major information systems. The Space Station Information System (SSIS) provides for the transparent collection and dissemination of operational information to all users and operators. The Technical and Management Information System (TMIS) provides all the developers with timely and consistent program information and a project management 'window' to assess the project status. The Software Support Environment (SSE) provides automated tools and standards to be used by all software developers. Together, these three systems are vital to the successful execution of the program.
Management of CAD/CAM information: Key to improved manufacturing productivity
NASA Technical Reports Server (NTRS)
Fulton, R. E.; Brainin, J.
1984-01-01
A key element to improved industry productivity is effective management of CAD/CAM information. To stimulate advancements in this area, a joint NASA/Navy/industry project designated Intergrated Programs for Aerospace-Vehicle Design (IPAD) is underway with the goal of raising aerospace industry productivity through advancement of technology to integrate and manage information involved in the design and manufacturing process. The project complements traditional NASA/DOD research to develop aerospace design technology and the Air Force's Integrated Computer-Aided Manufacturing (ICAM) program to advance CAM technology. IPAD research is guided by an Industry Technical Advisory Board (ITAB) composed of over 100 representatives from aerospace and computer companies.
Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-05-04
The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroadsmore » of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-06-01
The foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain and provide environmental education and support services related to INEL natural resource issues. Also, the foundation, with its university affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including waste management, environmental restoration, spent nuclear fuels, and land management issues. Major accomplishments during CY1995 can be divided into five categories: environmental surveillance program, environmental education, environmental services and support, ecological risk assessment, and research benefitting the DOE-ID mission.
Evaluation of the Public Transportation Network : Diffusion of Innovative Transit Practices
DOT National Transportation Integrated Search
1988-08-01
This report presents an evaluation of the Public Transportation Network (PTN), a technical assistance program established by the Urban Mass Transportation Administration in 1983 to help public transportation agencies adopt better ways of managing and...
45 CFR 2524.10 - For what purposes will technical assistance and training funds be made available?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 2522 of this chapter to meet educational, public safety, human, or environmental needs in communities... such programs to build an ethic of civic responsibility; (4) Develop the management and budgetary...
45 CFR 2524.10 - For what purposes will technical assistance and training funds be made available?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 2522 of this chapter to meet educational, public safety, human, or environmental needs in communities... such programs to build an ethic of civic responsibility; (4) Develop the management and budgetary...
Managing External Relations: The Lifeblood of Mission Success
NASA Technical Reports Server (NTRS)
Dumbacher, Daniel L.
2007-01-01
The slide presentation examines the role of customer and stakeholder relations in the success of space missions. Topics include agency transformation; an overview of project and program experience with a discussion of positions, technical accomplishments, and management lessons learned; and approaches to project success with emphasis on communication. Projects and programs discussed include the Space Shuttle Main Engine System, DC-XA Flight Demonstrator, X-33 Flight Demonstrator, Space Launch Initiative/2nd Generation Reusable Launch Vehicle, X-37 Flight Demonstrator, Constellation (pre Dr. Griffin), Safety and Mission Assurance, and Exploration Launch Projects.
Hydrologic Resources Management Program and Underground Tests Area Project FY 2003 Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
J., B C; F., E G; K., E B
This report describes FY 2003 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area (UGTA) Project. These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security.more » UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The present report is organized on a topical basis and contains five chapters that reflect the range of technical work performed by LLNL-CBND during FY 2003. Although we have emphasized investigations that were led by CBND, we also participated in a variety of collaborative studies with other UGTA and HRMP contract organizations including the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN).« less
Nuclear facility decommissioning and site remedial actions: a selected bibliography. Volume 5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Knox, N.P.; Chilton, B.D.
1984-09-01
This bibliography of 756 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions is the fifth in a series of annual reports prepared for the US Department of Energy, Division of Remedial Action Projects. Foreign as well as domestic literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department ofmore » Energy's Remedial Action Program. Major chapters are: (1) Surplus Facilities Management Program; (2) Nuclear Facilities Decommissioning; (3) Formerly Utilized Sites Remedial Action Program; (4) Uranium Mill Tailings Remedial Action Program; (5) Grand Junction Remedial Action Program; (6) Uranium Mill Tailings Management; and (7) Technical Measurements Center. Chapter sections for chapters 1, 2, 4, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. The references within each chapter or section are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for the categories of author, corporate affiliation, title, publication description, geographic location, and keywords. The Appendix contains a list of frequently used acronyms.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhu, Charles
In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes ofmore » the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1992-10-01
This appendix contains background information, technical descriptions, economic data, mass and energy balances, and information on environmental releases for the refuse derived fuels (RDF) option in municipal solid waste management alternatives. Demonstration programs at St. Louis, Missouri; Franklin, Ohio; and Delaware are discussed. Information on pellet production and cofiring with coal is also presented.
Technical and Economic Aspects of Designing an Efficient Room Air-Conditioner Program in India
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abhyankar, Nikit; Shah, Nihar; Phadke, Amol
Several studies have projected a massive increase in the demand for air conditioners (ACs) over the next two decades in India. By 2030, room ACs could add 140 GW to the peak load, equivalent to over 30% of the total projected peak load. Therefore, there is significant interest among policymakers, regulators, and utilities in managing room AC demand by enhancing energy efficiency. Building on the historical success of the Indian Bureau of Energy Efficiency’s star-labeling program, Energy Efficiency Services Limited recently announced a program to accelerate the sale of efficient room ACs using bulk procurement, similar to their successful UJALAmore » light-emitting diode (LED) bulk procurement program. This report discusses some of the key considerations in designing a bulk procurement or financial incentive program for enhancing room AC efficiency in India. We draw upon our previous research to demonstrate the overall technical potential and price impact of room AC efficiency improvement and its technical feasibility in India. We also discuss the importance of using low global warming potential (GWP) refrigerants and smart AC equipment that is demand response (DR) ready.« less
Reducing environmental noise impacts: A USAREUR noise management program handbook
NASA Astrophysics Data System (ADS)
Feather, Timothy D.; Shekell, Ted K.
1991-06-01
Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.
NASA Astrophysics Data System (ADS)
Prados, A. I.; Blevins, B.; Hook, E.
2015-12-01
NASA ARSET http://arset.gsfc.nasa.gov has been providing applied remote sensing training since 2008. The goals of the program are to develop the technical and analytical skills necessary to utilize NASA resources for decision-support. The program has reached over 3500 participants, with 1600 stakeholders from 100 countries in 2015 alone. The target audience for the program are professionals engaged in environmental management in the public and private sectors, such as air quality forecasters, public utilities, water managers and non-governmental organizations engaged in conservation. Many program participants have little or no expertise in NASA remote sensing, and it's frequently their very first exposure to NASA's vast resources. One the key challenges for the program has been the evolution and refinement of its approach to communicating NASA data access, research, and ultimately its value to stakeholders. We discuss ARSET's best practices for sharing NASA science, which include 1) training ARSET staff and other NASA scientists on methods for science communication, 2) communicating the proper amount of scientific information at a level that is commensurate with the technical skills of program participants, 3) communicating the benefit of NASA resources to stakeholders, and 4) getting to know the audience and tailoring the message so that science information is conveyed within the context of agencies' unique environmental challenges.
ERIC Educational Resources Information Center
Walter, Richard A.
The Pennsylvania State University served as the Pennsylvania Coordinator of Occupational Competency Assessment (OCA). It managed the Pennsylvania OCA Program, which provides the secondary public schools of the state with competent vocational instructors as a component of teacher preparation at Temple University, Indiana University of Pennsylvania,…
ERIC Educational Resources Information Center
Department of Education, Washington, DC.
This book provides guidance to school business office personnel who handle fiscal recordkeeping, accounting, and reporting functions for federal Title IV student financial aid programs authorized by the Higher Education Act of 1965, as amended. It provides a technical resource for Title IV management responsibilities that are shared among various…
Thakkar, Jay; Barry, Tony; Thiagalingam, Aravinda; Redfern, Julie; McEwan, Alistair L; Rodgers, Anthony
2016-01-01
Background Mobile health (mHealth) has huge potential to deliver preventative health services. However, there is paucity of literature on theoretical constructs, technical, practical, and regulatory considerations that enable delivery of such services. Objectives The objective of this study was to outline the key considerations in the development of a text message-based mHealth program; thus providing broad recommendations and guidance to future researchers designing similar programs. Methods We describe the key considerations in designing the intervention with respect to functionality, technical infrastructure, data management, software components, regulatory requirements, and operationalization. We also illustrate some of the potential issues and decision points utilizing our experience of developing text message (short message service, SMS) management systems to support 2 large randomized controlled trials: TEXT messages to improve MEDication adherence & Secondary prevention (TEXTMEDS) and Tobacco, EXercise and dieT MEssages (TEXT ME). Results The steps identified in the development process were: (1) background research and development of the text message bank based on scientific evidence and disease-specific guidelines, (2) pilot testing with target audience and incorporating feedback, (3) software-hardware customization to enable delivery of complex personalized programs using prespecified algorithms, and (4) legal and regulatory considerations. Additional considerations in developing text message management systems include: balancing the use of customized versus preexisting software systems, the level of automation versus need for human inputs, monitoring, ensuring data security, interface flexibility, and the ability for upscaling. Conclusions A merging of expertise in clinical and behavioral sciences, health and research data management systems, software engineering, and mobile phone regulatory requirements is essential to develop a platform to deliver and manage support programs to hundreds of participants simultaneously as in TEXT ME and TEXTMEDS trials. This research provides broad principles that may assist other researchers in developing mHealth programs. PMID:27847350
Thakkar, Jay; Barry, Tony; Thiagalingam, Aravinda; Redfern, Julie; McEwan, Alistair L; Rodgers, Anthony; Chow, Clara K
2016-11-15
Mobile health (mHealth) has huge potential to deliver preventative health services. However, there is paucity of literature on theoretical constructs, technical, practical, and regulatory considerations that enable delivery of such services. The objective of this study was to outline the key considerations in the development of a text message-based mHealth program; thus providing broad recommendations and guidance to future researchers designing similar programs. We describe the key considerations in designing the intervention with respect to functionality, technical infrastructure, data management, software components, regulatory requirements, and operationalization. We also illustrate some of the potential issues and decision points utilizing our experience of developing text message (short message service, SMS) management systems to support 2 large randomized controlled trials: TEXT messages to improve MEDication adherence & Secondary prevention (TEXTMEDS) and Tobacco, EXercise and dieT MEssages (TEXT ME). The steps identified in the development process were: (1) background research and development of the text message bank based on scientific evidence and disease-specific guidelines, (2) pilot testing with target audience and incorporating feedback, (3) software-hardware customization to enable delivery of complex personalized programs using prespecified algorithms, and (4) legal and regulatory considerations. Additional considerations in developing text message management systems include: balancing the use of customized versus preexisting software systems, the level of automation versus need for human inputs, monitoring, ensuring data security, interface flexibility, and the ability for upscaling. A merging of expertise in clinical and behavioral sciences, health and research data management systems, software engineering, and mobile phone regulatory requirements is essential to develop a platform to deliver and manage support programs to hundreds of participants simultaneously as in TEXT ME and TEXTMEDS trials. This research provides broad principles that may assist other researchers in developing mHealth programs. ©Jay Thakkar, Tony Barry, Aravinda Thiagalingam, Julie Redfern, Alistair L McEwan, Anthony Rodgers, Clara K Chow. Originally published in JMIR Mhealth and Uhealth (http://mhealth.jmir.org), 15.11.2016.
Ugwoke, Samuel C.; Eseadi, Chiedu; Igbokwe, Chima C.; Chiaha, Gertrude T.U.; Nwaubani, Okechukwu O.; Orji, Chibueze Tobias; Ugwuanyi, Leonard T.; Chukwuma, Ifeoma S.; Edikpa, Edith C.; Ogakwu, Vera N.; Onu, Eucharia A.; Agu, Patricia; Nwobi, Ujunwa A.; Omeke, Faith; Okeke, Francisca C.; Ezema, Rita N.; Abugu, Lawretta I.
2017-01-01
Abstract Background: Stress is the product of how an individual reacts and adapts to the specific demands and threats they encounter while carrying out given tasks. The main purpose of this study was to investigate the effects of a rational-emotive health education intervention (REHEI) on stress management, and irrational beliefs in a sample of technical college teachers in Southeast Nigeria. Method: The study design was a pretest–posttest control group. Repeated measures analysis of variance, paired t test and Mann–Whitney U tests were used to analyze the data collected. Results: The REHEI significantly reduced teacher stress in those teaching staff exposed to the treatment intervention, relative to a waitlist control group. Furthermore, the REHEI program significantly decreased irrational beliefs about teaching in those teaching staff exposed to the treatment intervention compared to a waitlist control group. Conclusion: The REHEI program can be used to coach teachers on how to manage and cope with stress and overcome irrational beliefs in teaching. PMID:28767584
Backstop: Shuttle Will Fly with Outstanding Waivers; New Oversight Eases Conflicts on Safety
NASA Technical Reports Server (NTRS)
Morring, Frank, Jr.
2005-01-01
he space shuttle Discovery is carrying some 300 waivers to technical specifications as it enters the home stretch of its planned return to flight next month. There were about 6,000 waivers in place when Columbia crashed. Shuttle managers say they are working to reduce the number of waivers remaining by fixing the problems they highlight, a change prompted by the Columbia Accident Investigation Board. In the wake of the accident, NASA has heeded the CAWS recommendation that waivers be the responsibility of an "independent technical authority" (ITA), rather than the shuttle program itself. To carry out the recommendation of the CAIB-which found an inherent conflict of interest in having the same managers make decisions about cost, schedule and safety-then-Administrator Sean O'Keefe designated the agency's chief engineer as the formal ITA. He is responsible for setting, maintaining and granting waivers across the agency. In mid-January, Fred Gregory, then O'Keefe's deputy and now his acting replacement, launched the ITA within NASA under Chief Engineer Rex Geveden, the former program manager on the Gravity Probe B experiment.
Chung, Bowen; Ngo, Victoria K; Ong, Michael K; Pulido, Esmeralda; Jones, Felica; Gilmore, James; Stoker-Mtume, Norma; Johnson, Megan; Tang, Lingqi; Wells, Kenneth Brooks; Sherbourne, Cathy; Miranda, Jeanne
2015-08-01
Community engagement and planning (CEP) could improve dissemination of depression care quality improvement in underresourced communities, but whether its effects on provider training participation differ from those of standard technical assistance, or resources for services (RS), is unknown. This study compared program- and staff-level participation in depression care quality improvement training among programs enrolled in CEP, which trained networks of health care and social-community agencies jointly, and RS, which provided technical support to individual programs. Matched programs from health care and social-community service sectors in two communities were randomly assigned to RS or CEP. Data were from 1,622 eligible staff members from 95 enrolled programs. Primary outcomes were any staff trained (for programs) and total hours of training (for staff). Secondary staff-level outcomes were hours of training in specific depression collaborative care components. CEP programs were more likely than RS programs to participate in any training (p=.006). Within health care sectors, CEP programs were more likely than RS programs to participate in training (p=.016), but within social-community sectors, there was no difference in training by intervention. Among staff who participated in training, mean training hours were greater among CEP programs versus RS programs for any type of training (p<.001) and for training related to each component of depression care (p<.001) except medication management. CEP may be an effective strategy to promote staff participation in depression care improvement efforts in underresourced communities.
Prerequisite programs at schools: diagnosis and economic evaluation.
Lockis, Victor R; Cruz, Adriano G; Walter, Eduardo H M; Faria, Jose A F; Granato, Daniel; Sant'Ana, Anderson S
2011-02-01
In this study, 20 Brazilian public schools have been assessed regarding good manufacturing practices and standard sanitation operating procedures implementation. We used a checklist comprised of 10 parts (facilities and installations, water supply, equipments and tools, pest control, waste management, personal hygiene, sanitation, storage, documentation, and training), making a total of 69 questions. The implementing modification cost to the found nonconformities was also determined so that it could work with technical data as a based decision-making prioritization. The average nonconformity percentage at schools concerning to prerequisite program was 36%, from which 66% of them own inadequate installations, 65% waste management, 44% regarding documentation, and 35% water supply and sanitation. The initial estimated cost for changing has been U.S.$24,438 and monthly investments of 1.55% on the currently needed invested values. This would result in U.S.$0.015 increase on each served meal cost over the investment replacement within a year. Thus, we have concluded that such modifications are economically feasible and will be considered on technical requirements when prerequisite program implementation priorities are established.
Management: A continuing literature survey with indexes
NASA Technical Reports Server (NTRS)
1978-01-01
This bibliography lists 782 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1977. The citations, and abstracts when available, are reproduced exactly as they appeared originally in IAA and STAR, including the original accession numbers from the respective announcement journals. Topics cover the management of research and development contracts, production, logistics, personnel, safety, reliability and quality control citations. Includes references on: program, project and systems management; management policy, philosophy, tools, and techniques; decisionmaking processes for managers; technology assessment; management of urban problems; and information for managers on Federal resources, expenditures, financing, and budgeting.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cochran, John Russell
The Al Tuwaitha nuclear complex near Baghdad contains a number of facilities from Saddam Hussan's nuclear weapons program. Past military operations, lack of upkeep and looting have created an enormous radioactive waste problem at the Al Tuwaitha complex, which contains various, uncharacterized radioactive wastes, yellow cake, sealed radioactive sources, and contaminated metals that must be constantly guarded. Iraq has never had a radioactive waste disposal facility and the lack of a disposal facility means that ever increasing quantities of radioactive material must be held in guarded storage. The Iraq Nuclear Facility Dismantlement and Disposal Program (the NDs Program) has beenmore » initiated by the U.S. Department of State (DOS) to assist the Government of Iraq (GOI) in eliminating the threats from poorly controlled radioactive materials, while building human capacities so that the GOI can manage other environmental cleanups in their country. The DOS is funding the IAEA to provide technical assistance via Technical Cooperation projects. Program coordination will be provided by the DOS, consistent with GOI policies, and Sandia National Laboratories will be responsible for coordination of participants and waste management support. Texas Tech University will continue to provide in-country assistance, including radioactive waste characterization and the stand-up of the Iraq Nuclear Services Company. The GOI owns the problems in Iraq and will be responsible for implementation of the NDs Program.« less
NASA Technical Reports Server (NTRS)
2005-01-01
This is a listing of recent unclassified RTO technical publications for January 1, 2005 through March 31, 2005 processed by the NASA Center for AeroSpace Center available on the NASA Aeronautics and Space Database. Contents include 1) Electronic Information Management; 2) Decision Support to Combined Joint Task Force and Component Commanders; 3) RTO Technical Publications : A Quarterly Listing (December 2004); 4) The Role of Humans in Intelligent and Automated Systems.
Research and Technology Operating Plan Summary: Fiscal Year 1973 Research and Technology Program
NASA Technical Reports Server (NTRS)
1972-01-01
Abstracts are presented of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA. This RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The summary is arranged in five sections consisting of citations and abstracts of the RTOPs and subject, technical monitor, responsible NASA organization, and RTOP number indexes.
Sea Grant Extension Crucial Link to Coastal Resources.
ERIC Educational Resources Information Center
Stumbos, John
1997-01-01
University of California Sea Grant Extension Program provides training and technical assistance to fishers, farmers, planners, and conservationists on projects such as coastal ecosystem health, marine environmental protection, fisheries management, aquaculture, salmon habitat restoration, and controlling nonpoint-source pollution; supports…
System Engineering of Aerospace and Advanced Technology Programs at AN Astronautics Company
NASA Astrophysics Data System (ADS)
Kennedy, Mike O.
The purpose of this Record of Study is to document an internship with the Martin Marietta Astronautics Group in Denver, Colorado that was performed in partial fulfillment of the requirements for the Doctor of Engineering degree at Texas A&M University, and to demonstrate that the internship objectives have been met. The internship included assignments with two Martin Marietta companies, on three different programs and in four areas of engineering. The Record of Study takes a first-hand look at system engineering, SDI and advanced program management, and the way Martin Marietta conducts business. The five internship objectives were related to assignments in system modeling, system integration, engineering analysis and technical management. In support of the first objective, the effects of thermally and mechanically induced mirror surface distortions upon the wavefront intensity field of a high energy laser beam passing through the optical train of a space-based laser system were modeled. To satisfy the second objective, the restrictive as opposed to the broad interpretation of the 1972 ABM Treaty, and the capability of the Strategic Defense Initiative Zenith Star Program to comply with the Treaty were evaluated. For the third objective, the capability of Martin Marietta to develop an automated analysis system to integrate and analyze Superconducting Super Collider detector designs was investigated. For the fourth objective, the thermal models that were developed in support of the Small Intercontinental Ballistic Missile flight tests were described. And in response to the fifth objective, the technical management role of the Product Integrity Engineer assigned to the Zenith Star spacecraft's Beam Control and Transfer Subsystem was discussed. This Record of Study explores the relationships between the engineering, business, security and social concerns associated with the practice of engineering and the management of programs by a major defense contractor.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Still, C.M.
1996-12-01
The primary waste management alternatives are source reduction, recycling, composting, incineration, and landfilling. Often waste management policies are based entirely on technical considerations and ignore that actual disposal practices depend on individuals` attitudes and behaviors. This research formulated a decision analysis model that incorporates social value measures to determine the waste management strategy that maximizes the individuals` willingness to participate. The social values that are important and that were considered in the decision support model to assist with making decisions about solid waste management were convenience, feeling good about reducing waste, feeling good about leaving a good environment for futuremore » generations, and the value of recreation programs that can be provided with profit from a recycling program.« less
NASA Technical Reports Server (NTRS)
Kelle, Pido I.; Ratterman, Christian; Gibbs, Cecil
2009-01-01
This slide presentation reviews the Constellation Program Problem Reporting, Analysis and Corrective Action Process and System (Cx PRACA). The goal of the Cx PRACA is to incorporate Lessons learned from the Shuttle, ISS, and Orbiter programs by creating a single tool for managing the PRACA process, that clearly defines the scope of PRACA applicability and what must be reported, and defines the ownership and responsibility for managing the PRACA process including disposition approval authority. CxP PRACA is a process, supported by a single information gathering data module which will be integrated with a single CxP Information System, providing interoperability, import and export capability making the CxP PRACA a more effective and user friendly technical and management tool.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kizilyalli, Isik; Evans, Craig; Matocha, Kevin
The ARPA-E model is unique in that the agency does not just provide teams funding. Throughout the lifetime of an ARPA-E award, ARPA-E Program Directors and Tech-to-Market Advisors also provide teams with expert advice through quarterly reviews and onsite visits. This hands-on approach helps ensure teams can meet ambitious milestones, target and tackle problems early on, and advance their technologies towards commercialization. Program Director Dr. Isik Kizilyalli explains the importance of this active project management approach in helping teams identify and overcome barriers. In this video, Energy Storage Systems (ESS) from the GRIDS program and Monolith Semiconductors from the SWITCHESmore » program discuss how ARPA-E’s active project management approach helped them find solutions to technical challenges.« less
Systems identification and the adaptive management of waterfowl in the United States
Williams, B.K.; Nichols, J.D.
2001-01-01
Waterfowl management in the United States is one of the more visible conservation success stories in the United States. It is authorized and supported by appropriate legislative authorities, based on large-scale monitoring programs, and widely accepted by the public. The process is one of only a limited number of large-scale examples of effective collaboration between research and management, integrating scientific information with management in a coherent framework for regulatory decision-making. However, harvest management continues to face some serious technical problems, many of which focus on sequential identification of the resource system in a context of optimal decision-making. The objective of this paper is to provide a theoretical foundation of adaptive harvest management, the approach currently in use in the United States for regulatory decision-making. We lay out the legal and institutional framework for adaptive harvest management and provide a formal description of regulatory decision-making in terms of adaptive optimization. We discuss some technical and institutional challenges in applying adaptive harvest management and focus specifically on methods of estimating resource states for linear resource systems.
,; ,; Ellis, Melvin Y.
1978-01-01
Passage of the Coastal Zone Management Act of 1972 focused attention on the Nation's coastal land and water areas. As plans for more effective management of the coastal zone evolved, it soon became apparent that improved maps and charts of these areas were needed. This handbook was prepared with the requirements of the entire coastal community in mind, giving greatest attention to the needs of coastal zone managers and planners at the State and local levels. Its principal objective is to provide general information and guidance; it is neither a textbook nor a technical manual, but rather a primer on coastal mapping. This handbook should help planners and managers of coastal programs to determine their mapping requirements, select the best maps and charts for their particular needs, and to deal effectively with personnel who gather data and prepare maps. The sections on "Sources of Assistance and Advice" and "Product and Data Sources" should be especially useful to all involved in mapping the coastal zone. Brief summaries of the mapping efforts of several State coastal zone management programs are included. "Future outlook" discusses anticipated progress and changes in mapping procedures and techniques. Illustrations are inserted, where appropriate, to illustrate the products and equipment discussed. Because of printing restrictions, the colors in map illustrations may vary from those in the original publication. The appendixes include substantial material which also should be of interest. In addition a glossary and an index are included to provide easy and quick access to the terms and concepts used in the text. For those interested in more technical detail than is provided in this handbook, the "Selected references" will be useful. Also, the publications of the professional societies listed in appendix 4 will provide technical information in detail.
Independent technical review, handbook
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction,more » and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.« less
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
National briefing summaries: Nuclear fuel cycle and waste management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, K.J.; Lakey, L.T.; Silviera, D.J.
The National Briefing Summaries is a compilation of publicly available information concerning the nuclear fuel cycle and radioactive waste management strategies and programs of 21 nations, including the United States and three international agencies that have publicized their activities in this field. It presents available highlight information with references that may be used by the reader for additional information. The information in this document is compiled primarily for use by the US Department of Energy and other US federal agencies and their contractors to provide summary information on radioactive waste management activities in other countries. This document provides an awarenessmore » to managers and technical staff of what is occurring in other countries with regard to strategies, activities, and facilities. The information may be useful in program planning to improve and benefit United States' programs through foreign information exchange. Benefits to foreign exchange may be derived through a number of exchange activities.« less
Small, Short Duration Technical Team Dynamics
2006-05-01
Organizations and a Strategy of Implementation. Academy of Management Journal. Vol. October, pp. 98-111. Ivancevich , John M. 1974. A Study of a Cognitive...Training Program: Trainer Styles and Group Development. Academy of Management Journal. Vol. 17, No. 3, p. 428. 315 Ivancevich , John M. and J...Vol. 90, pp. 141-153. Lyon , J. Michael. 2003. Mentoring of Scientists and Engineers: Dyadic and Formality Effects on Career Development and
Chakraborty, Sarbani; Frick, Kevin
2002-11-01
In many developing countries, private health practitioners provide a significant portion of curative care for diseases which are of public health importance. Currently, health sector reform efforts in these countries are fostering increased participation of private providers in the delivery of health services, including those of public health importance. Guaranteeing good technical quality of care is critical to the process. However, little is known about private providers' technical quality of care (disease management practices) and the factors influencing these services. The purpose of this study was to contribute information on this topic. The study was conducted among private providers in rural West Bengal, India and focused on providers' disease management practices for acute respiratory infections (ARI) among under-five children. World Health Organization (WHO) guidelines for ARI case management were used as the expected standard of care. Observations of patient-provider encounters and interviews with the providers and mothers were the main sources of data. The study found that private health providers in rural West Bengal have inadequate technical quality of care. The problem was related both to low levels of performance (limited potential) and inconsistency in performance (within-provider variation). Limited potential for good technical quality for ARI among the providers was related to lack of knowledge (technical incompetence). One of the important factors influencing within-provider variation was patient load. Since rural private providers operate on a fee-for-service payment system, there are incentives related to seeing many patients. The study concluded that to bring about sustainable improvements in private providers' ARI disease management practices, training programs and interventions that improved compliance were necessary.
2014 Water Power Program Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2014-08-18
The Water Power Peer Review Meeting was held February 24-28, 2014 in Arlington, VA. Principle investigators from the Energy Department National Laboratories, academic, and industry representatives presented the progress of their DOE-funded research. This report documents the formal, rigorous evaluation process and findings of nine independent reviewers who examined the technical, scientific, and business results of 96 projects of the Water Power Program, as well as the productivity and management effectiveness of the Water Power Program itself.
Embedded Thermal Control for Spacecraft Subsystems Miniaturization
NASA Technical Reports Server (NTRS)
Didion, Jeffrey R.
2014-01-01
Optimization of spacecraft size, weight and power (SWaP) resources is an explicit technical priority at Goddard Space Flight Center. Embedded Thermal Control Subsystems are a promising technology with many cross cutting NSAA, DoD and commercial applications: 1.) CubeSatSmallSat spacecraft architecture, 2.) high performance computing, 3.) On-board spacecraft electronics, 4.) Power electronics and RF arrays. The Embedded Thermal Control Subsystem technology development efforts focus on component, board and enclosure level devices that will ultimately include intelligent capabilities. The presentation will discuss electric, capillary and hybrid based hardware research and development efforts at Goddard Space Flight Center. The Embedded Thermal Control Subsystem development program consists of interrelated sub-initiatives, e.g., chip component level thermal control devices, self-sensing thermal management, advanced manufactured structures. This presentation includes technical status and progress on each of these investigations. Future sub-initiatives, technical milestones and program goals will be presented.