Sample records for management programs final

  1. 77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...

  2. 78 FR 70225 - West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... Department of Environmental Protection, (WVDEP), Division of Water and Waste Management, 601 57th Street SE...] West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY... for final authorization of revisions to its hazardous waste program under the Resource Conservation...

  3. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  4. 76 FR 58492 - Agency Information Collection Activities; Proposed Collection; Comment Request; Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-21

    ... Activities; Proposed Collection; Comment Request; Final Authorization for Hazardous Waste Management Programs... Request (ICR) concerning final authorization for State Hazardous Waste Management Programs. This ICR is... potentially affected by this action are States. Title: Final Authorization for Hazardous Waste Management...

  5. 76 FR 6594 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S...

  6. 77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...

  7. 76 FR 6564 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... implement the RCRA hazardous waste management program. We granted authorization for changes to their program..., 06/ 62-730.185(1) F.A.C. Universal Waste Management. 29/07. State Initiated Changes to the 62-730.210...

  8. 77 FR 69788 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). The EPA proposes to grant final authorization to the hazardous waste program changes submitted by the...

  9. 76 FR 6594 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S. Environmental Protection...

  10. 75 FR 81187 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed Rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... Agency (EPA) to authorize states to operate their hazardous waste management programs in lieu of the...

  11. 75 FR 6839 - Technical Service Provider Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...

  12. 78 FR 25579 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... prohibitions imposed by Federal regulations that EPA promulgates pursuant to the Hazardous and Solid Waste...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...

  13. 76 FR 6561 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... authorization during the comment period, the decision to authorize North Carolina's changes to its hazardous...

  14. 78 FR 15299 - New York: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... Solid Waste Amendments of 1984 (HSWA). New Federal requirements and prohibitions imposed by Federal...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental...

  15. 78 FR 15338 - New York: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R02-RCRA-2013-0144; FRL-9693-3] New York: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...

  16. 75 FR 918 - Oregon: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... hazardous waste management program under the Resource Conservation and Recovery Act, as amended (RCRA). On... has decided that the revisions to the Oregon hazardous waste management program satisfy all of the...

  17. Federal Register Notice: Final Rule Establishing Consolidated Permit Program Requirements Under Several Environmental Statutes

    EPA Pesticide Factsheets

    This final rule establishes consolidated permit program requirements governing the Hazardous Waste Management program under the Resource Conservation and Recovery Act (RCRA) and other related programs.

  18. 75 FR 71325 - Wildlife Habitat Incentive Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... Wildlife Habitat Incentive Program AGENCY: Commodity Credit Corporation, Natural Resources Conservation... final rule for the Wildlife Habitat Incentive Program (WHIP). This final rule sets forth how NRCS, using... Albert Cerna, National Wildlife Habitat Incentive Program Manager, Financial Assistance Programs Division...

  19. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  20. Dissemination and Implementation of a Financial Management Program for Adult/Young Farmers in Vocational Agriculture Programs in Missouri. Final Report.

    ERIC Educational Resources Information Center

    Denker, Robert; Stewart, Bob R.

    In addition to an eight-page narrative, this final report contains materials and products from phase 2 of a project to develop, disseminate, and implement a three-year sequenced individualized and group instructional program in financial management for adult/young farmers in vocational agriculture. The narrative section discusses the four project…

  1. 40 CFR 272.1351 - Montana State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Montana § 272.1351... its hazardous waste management program. However, EPA retains the authority to exercise its inspection... this section are incorporated by reference as part of the hazardous waste management program under...

  2. 40 CFR 272.2501 - Wisconsin State-administered program; final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501... cited in this paragraph are incorporated by reference as part of the hazardous waste management program... Applicable to the Hazardous Waste Management Program, (dated August 9, 1993). (2) EPA Approved Wisconsin...

  3. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  4. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  5. 40 CFR 272.1301 - State-administered program; Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Missouri § 272.1301 State... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) Missouri Statutory Requirements Applicable to the Hazardous Waste Management Program...

  6. 40 CFR 272.1301 - State-administered program; Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Missouri § 272.1301 State... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) Missouri Statutory Requirements Applicable to the Hazardous Waste Management Program...

  7. 40 CFR 272.1301 - State-administered program; Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Missouri § 272.1301 State... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) Missouri Statutory Requirements Applicable to the Hazardous Waste Management Program...

  8. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  9. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...

  10. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...

  11. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  12. 40 CFR 272.1301 - State-administered program; Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Missouri § 272.1301 State... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) Missouri Statutory Requirements Applicable to the Hazardous Waste Management Program...

  13. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  14. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  15. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  16. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Indiana § 272.751... the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. This... Applicable to the Hazardous Waste Management Program, dated March 2001. (ii) The EPA approved Indiana...

  17. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  18. 40 CFR 272.501 - Florida State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Florida § 272.501... part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Florida's Statutory Requirements Applicable to the Hazardous Waste Management Program, dated...

  19. 40 CFR 272.1301 - State-administered program; Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Missouri § 272.1301 State... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) Missouri Statutory Requirements Applicable to the Hazardous Waste Management Program...

  20. 40 CFR 272.151 - Arizona State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Arizona § 272.151... the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i) EPA Approved Arizona Statutory Requirements Applicable to the Hazardous Waste Management Program, June 1995...

  1. 40 CFR 272.1801 - State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Ohio § 272.1801 State... regulations are incorporated by reference and codified as part of the hazardous waste management program under..., 1989, is codified as part of the authorized hazardous waste management program under Subtitle C of RCRA...

  2. 40 CFR 272.1201 - Minnesota State-administered program; Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Minnesota § 272.1201... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C... the Hazardous Waste Management Program, dated April 5, 1994. (2) The following statutes and...

  3. 15 CFR 923.94 - Application for program development or implementation grants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Applications for Program...) The cumulative progress toward meeting the requirements for preliminary or final approval of a coastal...

  4. 15 CFR 923.94 - Application for program development or implementation grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS Applications for Program...) The cumulative progress toward meeting the requirements for preliminary or final approval of a coastal...

  5. 40 CFR 272.1151 - State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Michigan § 272.1151 State... hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation, by... part of the authorized hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et...

  6. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho... hazardous waste management program. However, the EPA retains the authority to exercise its inspection and... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C...

  7. 40 CFR 272.1151 - State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Michigan § 272.1151 State... hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation, by... part of the authorized hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et...

  8. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho... hazardous waste management program. However, the EPA retains the authority to exercise its inspection and... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C...

  9. 40 CFR 272.1151 - State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Michigan § 272.1151 State... hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation, by... part of the authorized hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et...

  10. Small Business Management Volume IV: Final Report. An Adult Education Program. Development, Demonstration and Evaluation of Management Education Programs for Small Business Entrepreneurs, Including Minorities.

    ERIC Educational Resources Information Center

    Persons, Edgar A.; Swanson, Gordon I.

    The purpose of the small business management program is to help families improve the effectiveness of their business operation and enable them to reach family and business goals. Similar to a successful program in farm management education operational in Minnesota since 1952, the program includes classroom instruction, small group instruction,…

  11. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...

  12. 76 FR 67991 - Medicare Program; Final Waivers in Connection With the Shared Savings Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... governance, management, and leadership of the ACO, as well as program integrity, transparency, compliance... ACOs to promote accountability for individual Medicare beneficiaries and population health management...-kickback statute safe harbors include, among others, those for employment, personal services and management...

  13. Solar Decathlon 2017: Final Report and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Incorporated, Energetics

    This final report introduces the Solar Decathlon 2017 Program Administrator, Core Advisory Committee, event sponsors and donors, and regional stakeholders that were integral to the success of Solar Decathlon 2017. The substantial balance of this report presents evaluative metrics and lessons learned about the primary aspects of administering Solar Decathlon 2017, including Project Management, Competition and Site Management, Stakeholder Engagement, Communications, Sponsor Management, Education Programming, and Volunteer Coordination. Several appendices compliment the discussion.

  14. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Reserve Select for certain members of the selected reserve; Transitional Assistance Management Program; early eligibility for TRICARE for certain reserve component members. Interim final rule with comment period.

    PubMed

    2005-03-16

    This interim final rule establishes requirements and procedures for implementation of TRICARE Reserve Select. It also revises requirements and procedures for the Transitional Assistance Management Program. In addition, it establishes requirements and procedures for implementation of the earlier TRICARE eligibility for certain reserve component members. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  15. 40 CFR 272.1201 - Minnesota State-administered program; Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Minnesota State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Minnesota § 272.1201 Minnesota State-administered program; Final authorization. Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  16. 40 CFR 272.1201 - Minnesota State-administered program; Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Minnesota State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Minnesota § 272.1201 Minnesota State-administered program; Final authorization. Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  17. 40 CFR 272.1201 - Minnesota State-administered program; Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Minnesota State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Minnesota § 272.1201 Minnesota State-administered program; Final authorization. Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  18. 40 CFR 272.1201 - Minnesota State-administered program; Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Minnesota State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Minnesota § 272.1201 Minnesota State-administered program; Final authorization. Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  19. 40 CFR 272.1651 - New York State-Administered Program: final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false New York State-Administered Program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS New York § 272.1651 New York State-Administered Program: final authorization. (a) Pursuant to section 3006(b) of RCRA, 42...

  20. 40 CFR 272.1601 - New Mexico State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false New Mexico State-Administered Program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS New Mexico § 272.1601 New Mexico State-Administered Program: Final Authorization. (a) Pursuant to section 3006(b) of RCRA...

  1. 40 CFR 272.1601 - New Mexico State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false New Mexico State-Administered Program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS New Mexico § 272.1601 New Mexico State-Administered Program: Final Authorization. (a) Pursuant to section 3006(b) of RCRA...

  2. 40 CFR 272.1601 - New Mexico State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false New Mexico State-Administered Program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS New Mexico § 272.1601 New Mexico State-Administered Program: Final Authorization. (a) Pursuant to section 3006(b) of RCRA...

  3. 40 CFR 272.1601 - New Mexico State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false New Mexico State-Administered Program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS New Mexico § 272.1601 New Mexico State-Administered Program: Final Authorization. (a) Pursuant to section 3006(b) of RCRA...

  4. 40 CFR 272.2501 - Wisconsin State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Wisconsin State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501 Wisconsin State-administered program: Final authorization. (a) Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  5. 40 CFR 272.2501 - Wisconsin State-administered program; final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Wisconsin State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501 Wisconsin State-administered program; final authorization. Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  6. 40 CFR 272.2501 - Wisconsin State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Wisconsin State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501 Wisconsin State-administered program: Final authorization. (a) Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  7. 40 CFR 272.2501 - Wisconsin State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Wisconsin State-administered program... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Wisconsin § 272.2501 Wisconsin State-administered program: Final authorization. (a) Pursuant to section 3006(b) of RCRA, 42 U.S.C...

  8. Development and Implementation of a Model Training Program to Assist Special Educators, Parks and Resource Management Personnel and Parents to Cooperatively Plan and Conduct Outdoor/Environmental Education Programs for Handicapped Children and Youth. Final Report.

    ERIC Educational Resources Information Center

    Vinton, Dennis A.; Zachmeyer, Richard F.

    This final report presents a description of a 3-year project to develop and implement a model training program (for special education personnel, park and resource management personnel, and parents of disabled children) designed to promote outdoor environmental education for disabled children. The project conducted 22 training workshops (2-5 days)…

  9. Business and Management Development Training Program for Hispanic Women. Final Report.

    ERIC Educational Resources Information Center

    Miranda (L.) and Associates, Bethesda, MD.

    A program was conducted to develop and motivate minority women, in particular Hispanic origin women, in the Washington, D.C., metropolitan area to participate in business ownership and management. Offered at no cost to participants, the training program sought to equip potential managers with information and techniques in the fundamental…

  10. 40 CFR 272.701 - State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Illinois § 272.701 State... Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 as part of the hazardous waste management... Administrator on January 26, 1990, is part of the authorized hazardous waste management program under Subtitle C...

  11. 40 CFR 272.701 - State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Illinois § 272.701 State... Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 as part of the hazardous waste management... Administrator on January 26, 1990, is part of the authorized hazardous waste management program under Subtitle C...

  12. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho..., 2008. (b) The State of Idaho has primary responsibility for enforcing its hazardous waste management... part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i...

  13. 40 CFR 272.701 - State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Illinois § 272.701 State... Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 as part of the hazardous waste management... Administrator on January 26, 1990, is part of the authorized hazardous waste management program under Subtitle C...

  14. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho..., 2008. (b) The State of Idaho has primary responsibility for enforcing its hazardous waste management... part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i...

  15. 40 CFR 272.701 - State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Illinois § 272.701 State... Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 as part of the hazardous waste management... Administrator on January 26, 1990, is part of the authorized hazardous waste management program under Subtitle C...

  16. Small Business Management Education. Entrepreneurship Education for Adults-Program Development and Implementation. Final Report.

    ERIC Educational Resources Information Center

    Minnesota Univ., St. Paul. Dept. of Agricultural Education.

    A project was organized around a series of activities to prepare materials or disseminations for small business management education programs. Activities were as follow: (1) prepare needs assessment procedures for determining the number and types of businesses to be served by a small business management education program; prepare model…

  17. 40 CFR 272.701 - State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Illinois § 272.701 State... Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51 as part of the hazardous waste management... Administrator on January 26, 1990, is part of the authorized hazardous waste management program under Subtitle C...

  18. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho..., 2008. (b) The State of Idaho has primary responsibility for enforcing its hazardous waste management... part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i...

  19. 40 CFR 272.951 - Louisiana state-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Louisiana state-administered program: Final authorization. 272.951 Section 272.951 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Louisiana § 272.951...

  20. 76 FR 31303 - Notice of Availability or Record of Decision and Final Findings of Approvability to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... continued comprehensive protection of Washington's coastal resources. OCRM did not select either Alternative... Record of Decision and Final Findings of Approvability to the Washington Coastal Zone Management Program... and Coastal Resource Management. ACTION: Notice of Availability or Record of Decision and Final...

  1. FINAL Progress Report DOE Grant DE-FG02-04ER15587

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mullins, Charles Buddie

    Catalysis Program - Viviane Schwartz Program Manager This Final Report discusses several archival journal articles that have been published that present and discuss the results that were discovered through this DOE grant.

  2. Conflict Management in Schools: Sowing Seeds for a Safer Society. Final Report of the School Conflict Management Demonstration Project 1990-1993.

    ERIC Educational Resources Information Center

    Wheeler, Terrence; And Others

    In August 1990, the Ohio Commission on Dispute Resolution and Conflict Management initiated a three-year School Conflict Management Demonstration Project. This publication is the final report on the Project. Twenty schools, which reflected the state's diversity, were selected to help assess the impact of the conflict management programs. The…

  3. Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witte, M.C.

    1994-10-01

    In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

  4. The Records Management Officer in Local Government. Basic Records Management for Local Government, No. 2.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. State Archives and Records Administration.

    This reports provides local governments with guidelines and suggestions for selecting a Records Management Officer to develop, organize, and direct a records management program. Such a program is described as an over-arching, continuing, administrative effort that manages recorded information from its initial creation to its final disposition.…

  5. Federal Employees Health Benefits Program: members of Congress and Congressional staff. Final rule.

    PubMed

    2013-10-02

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding coverage for Members of Congress and congressional staff.

  6. 20 CFR 411.660 - Is SSA's decision final?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Is SSA's decision final? 411.660 Section 411.660 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program Managers § 411...

  7. 20 CFR 411.660 - Is SSA's decision final?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Is SSA's decision final? 411.660 Section 411.660 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program Managers § 411...

  8. 20 CFR 411.660 - Is SSA's decision final?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Is SSA's decision final? 411.660 Section 411.660 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program Managers § 411...

  9. 20 CFR 411.660 - Is SSA's decision final?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Is SSA's decision final? 411.660 Section 411.660 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program Managers § 411...

  10. 20 CFR 411.660 - Is SSA's decision final?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Is SSA's decision final? 411.660 Section 411.660 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Ticket to Work Program Dispute Resolution Disputes Between Employment Networks and Program Managers § 411...

  11. 40 CFR 272.1851 - Oklahoma State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Oklahoma § 272.1851...)(1)(i) of this section are incorporated by reference as part of the hazardous waste management... Approved Oklahoma Statutory and Regulatory Requirements Applicable to the Hazardous Waste Management...

  12. Controls Over Project Management Oversight Program

    DOT National Transportation Integrated Search

    1997-12-08

    This is the final report on Federal Transit Administration's (FTA) controls over its Project Management Oversight (PMO) Program. This report reflects Office of Inspector General's (OIG) consideration of information provided in FTA's May 29, 1997, rep...

  13. Federal Employees Health Benefits Program miscellaneous changes: Medically Underserved Areas. Direct final rule.

    PubMed

    2014-12-17

    The U.S. Office of Personnel Management (OPM) is issuing a direct final rule to discontinue the annual determination of the Medically Underserved Areas (MUAs) for the Federal Employees Health Benefits (FEHB) Program.

  14. Statewide Geotechnical Asset Management Program Development : Final Report for Rock Slopes, Unstable Soil Slopes and Embankments, Retaining Walls, and Material Sites

    DOT National Transportation Integrated Search

    2017-09-05

    The Alaska Department of Transportation and Public Facilities (AKDOT&PF) has developed the nations first Geotechnical Asset Management Program. The program encompasses rock slopes, unstable slopes and embankments, retaining walls, and material sou...

  15. Medicaid and Children's Health Insurance Programs; Mental Health Parity and Addiction Equity Act of 2008; the Application of Mental Health Parity Requirements to Coverage Offered by Medicaid Managed Care Organizations, the Children's Health Insurance Program (CHIP), and Alternative Benefit Plans. Final rule.

    PubMed

    2016-03-30

    This final rule will address the application of certain requirements set forth in the Public Health Service Act, as amended by the Paul Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008, to coverage offered by Medicaid managed care organizations, Medicaid Alternative Benefit Plans, and Children’s Health Insurance Programs.

  16. Base-level management of radio-frequency radiation-protection program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rademacher, S.E.; Montgomery, N.D.

    1989-04-01

    AFOEHL developed this report to assist the base-level aerospace medical team manage their radio-frequency radiation-protection program. This report supersedes USAFOEHL Report 80-42, 'A Practical R-F Guide for BEES.'

  17. Base-level management of radio-frequency radiation-protection program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rademacher, S.E.; Montgomery, N.D.

    1989-04-01

    AFOEHL developed this report to assist the base-level aerospace medical team manage their radio-frequency radiation protection program. This report supersedes USAFOEHL Report 80-42, 'A practical R-F Guide for BEES.'

  18. 40 CFR 272.401 - State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Delaware § 272.401 State... regulations cited in this paragraph are incorporated by reference and made a part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation by reference was...

  19. 40 CFR 272.401 - State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Delaware § 272.401 State... regulations cited in this paragraph are incorporated by reference and made a part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation by reference was...

  20. 40 CFR 272.401 - State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Delaware § 272.401 State... regulations cited in this paragraph are incorporated by reference and made a part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation by reference was...

  1. 40 CFR 272.401 - State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Delaware § 272.401 State... regulations cited in this paragraph are incorporated by reference and made a part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation by reference was...

  2. 10 CFR 709.17 - Final disposition of CI evaluation findings and recommendations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... recommendations. 709.17 Section 709.17 Energy DEPARTMENT OF ENERGY COUNTERINTELLIGENCE EVALUATION PROGRAM CI... Intelligence and Counterintelligence must recommend, in writing, to the appropriate Program Manager that the covered person's access be approved or retained, or denied or revoked. (b) If the Program Manager agrees...

  3. 40 CFR 272.401 - State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Delaware § 272.401 State... regulations cited in this paragraph are incorporated by reference and made a part of the hazardous waste management program under Subtitle C of RCRA, 42 U.S.C. 6921 et seq. This incorporation by reference was...

  4. Final Report on the Development of the Long Beach Fire Department Company Officer Orientation Program.

    ERIC Educational Resources Information Center

    Rupe, Marvin L.; And Others

    The Long Beach Fire Department (California), developed a program to foster and improve the development of future fire department managers who are promoted from within the department. A 10-day orientation program was developed. The competency-based program featured a mix of management-leadership training (the nature of leadership, personnel…

  5. United States Air Force Summer Research Program -- 1993 Summer Research Program Final Reports. Volume 10. Wright Laboratory

    DTIC Science & Technology

    1993-01-01

    LABORATORIES 5800 Uplander Way Culver City, CA 90230-6608 Program Director, RDL Program Manager , AFOSR Gary Moore Col. Hal Rhoades Program Manager , RDL...Laboratory: PL/RK Aerospace Engineering University of Cinc nati Vol-Page No: 8-10 Cincinnati, OH 45221-0000 Burns, Paul Field: Electrical Engineering as...Laboratory: PL/GP Electrical Engineering Boston University Vol-Page No: a- 5 Boston, MA 2215-0000 GSRP Participant Data Stauffer, Joseph Field: Management MS

  6. DON Mentor-Protege Program

    DTIC Science & Technology

    2011-08-23

    The HCA Small Business Office should forward endorsed agreements for evaluation to the Mentor-Protégé Program Manager for final review by close of...PROGRAM MANAGER Oreta Stinson Small Business Programs Office of the Secretary of the Navy 720 Kennon Ave S.E. Building 36, Room 207 Washington...DON Mentor-Protégé Program August 23, 2011 Oreta Stinson Deputy Director, Department of the Navy Office of Small Business Programs Report

  7. Stage I Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume I).

    ERIC Educational Resources Information Center

    Puma, Michael J.; And Others

    The third phase of SISFAP (Study on the Impact of Student Financial Aid Programs), the primary purpose of this study is to evaluate federal and institutional management policies and practices for Basic Educational Opportunity Grant (BEOG) and campus-based programs as they impact on the extent to which the programs are meeting their legislative…

  8. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    PubMed

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  9. 78 FR 58988 - Louisiana: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-25

    ... Waste Management Program AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... Hazardous Waste Management Programs'', Louisiana's authorized hazardous waste program. The EPA will...), 3006, and 7004(b) of the Solid Waste Disposal Act, as amended, 42 U.S.C. 6912(a), 6926, and 6974(b...

  10. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  11. Federal employees dental and vision insurance program. Final rule.

    PubMed

    2008-08-26

    The Office of Personnel Management (OPM) is issuing final regulations to administer the Federal Employee Dental and Vision Benefits Enhancement Act of 2004, signed into law December 23, 2004. This law establishes dental and vision benefits programs for Federal employees, annuitants, and their eligible family members.

  12. Records Legislation for Local Governments.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. State Archives and Records Administration.

    This information leaflet provides local governments with guidelines and suggestions for writing an ordinance, resolution, or local law to establish a records management program. Such a program is an over-arching, continuing, administrative effort which manages recorded information from initial creation to final disposition. It includes…

  13. KSC-2010-4885

    NASA Image and Video Library

    2010-09-28

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Bill McArthur, (left) Space Shuttle Program Orbiter Projects manager; John Casper, Assistant Space Shuttle Program manager; John Shannon, Space Shuttle Program manager and Canadian Space Agency astronaut Chris Hadfield attend a ceremony being held to commemorate the move from Kennedy's Assembly Refurbishment Facility (ARF) to the Vehicle Assembly Building (VAB) of the Space Shuttle Program's final solid rocket booster structural assembly -- the right-hand forward. The move was postponed because of inclement weather. Photo credit: NASA/Kim Shiflett

  14. 78 FR 54200 - Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... take effect. We will then respond to public comments in a later final rule based on this proposal. You... Programs, U.S. EPA Region III, 1650 Arch Street, Philadelphia, PA 19103-2029. 4. Hand Delivery: At the... 3LC50, Office of State Programs, U.S. EPA Region III, 1650 Arch Street, Philadelphia, PA 19103-2029...

  15. Student pharmacists' perceptions of community pharmacy residency programs.

    PubMed

    Datar, Manasi V; Holmes, Erin R; Adams, Alex J; Stolpe, Samuel F

    2013-01-01

    To compare penultimate-year (next-to-last) and final-year student pharmacists' perceptions of the educational value of community pharmacy residency programs (CPRPs) and to compare student pharmacists' perceptions of the educational value of CPRPs and health-system residency programs (HSRPs). A self-administered online survey was sent to administrators at 119 Accreditation Council for Pharmacy Education-accredited schools of pharmacy for ultimate distribution to penultimate- and final-year student pharmacists. The survey included demographic measures and a 20-item residency program "perceived value of skill development" scale developed for this study. 1,722 completed surveys were received and analyzed. Penultimate-year students attributed greater value to CPRPs more frequently than final-year students. Students more often attributed higher value to CPRPs for skills related to business management, practice management, and medication therapy management, while they attributed higher value to HSRPs for skills related to teaching, research, and clinical knowledge. The results of this study suggest students' perceived value of CPRPs may be related to their year of pharmacy school and the pharmacy practice skill in question.

  16. Final Natural Resource Actions Environmental Assessment

    DTIC Science & Technology

    2005-06-22

    populations through use of insecticides and rodenticides would be accomplished under the supervision of the Base Pest Management Office and coordinated... Insecticide , Fungicide, and Rodenticide Act; DoD Directive 4150.7, DoD Pest Management Program; AFI 32-1053, Pest Management Program; and the North... insecticide and herbicide. Grand Forks AFB constructed a 2,400-square-foot pest management facility in 1996 in accor- dance with the guidelines

  17. 77 FR 60137 - Lee Metcalf National Wildlife Refuge, Ravalli County, MT; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    .... The final plan identifies goals, objectives, and strategies that describe the future management of the... management purpose, for migratory birds'' (Migratory Bird Conservation Act); and (2) ``for (a) incidental... participate in interpretive programs in the indoor and outdoor classrooms. The Refuge provides habitat for...

  18. The Vocational Education Component of the Rhode Island Educational Management Information System.

    ERIC Educational Resources Information Center

    Galamaga, Donald P.; Bartolomeo, Paul A.

    The document describes the implementation (Phase Two) of the Vocational Educational module--one component of an educational management information system. Phase Two entails the technical effort of final system design, final output specifications, edit specifications, system software selection, computer programing, systems documentation and the…

  19. Models and Procedures for Improving the Planning, Management, and Evaluation of Cooperative Education Programs. Final Report. Volume I.

    ERIC Educational Resources Information Center

    Blaschke, Charles L.; Steiger, JoAnn

    This report of a project to design a set of training guidelines for planning, managing, and evaluating cooperative education programs describes briefly the procedures used in developing the guidelines and model; discusses the various components of the planning, management, and evaluation process; and presents guidelines and criteria for designing…

  20. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  1. The Records Advisory Board in Local Government.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. State Archives and Records Administration.

    This information leaflet provides local governments with guidelines and suggestions for appointing a Records Advisory Board to assist in establishing and supporting a records management program. Such a program is an over-arching, continuing, administrative effort which manages recorded information from initial creation to final disposition. It…

  2. [The use of systematic review to develop a self-management program for CKD].

    PubMed

    Lee, Yu-Chin; Wu, Shu-Fang Vivienne; Lee, Mei-Chen; Chen, Fu-An; Yao, Yen-Hong; Wang, Chin-Ling

    2014-12-01

    Chronic kidney disease (CKD) has become a public health issue of international concern due to its high prevalence. The concept of self-management has been comprehensively applied in education programs that address chronic diseases. In recent years, many studies have used self-management programs in CKD interventions and have investigated the pre- and post-intervention physiological and psychological effectiveness of this approach. However, a complete clinical application program in the self-management model has yet to be developed for use in clinical renal care settings. A systematic review is used to develop a self-management program for CKD. Three implementation steps were used in this study. These steps include: (1) A systematic literature search and review using databases including CEPS (Chinese Electronic Periodical Services) of Airiti, National Digital Library of Theses and Dissertations in Taiwan, CINAHL, Pubmed, Medline, Cochrane Library, and Joanna Briggs Institute. A total of 22 studies were identified as valid and submitted to rigorous analysis. Of these, 4 were systematic literature reviews, 10 were randomized experimental studies, and 8 were non-randomized experimental studies. (2) Empirical evidence then was used to draft relevant guidelines on clinical application. (3) Finally, expert panels tested the validity of the draft to ensure the final version was valid for application in practice. This study designed a self-management program for CKD based on the findings of empirical studies. The content of this program included: design principles, categories, elements, and the intervention measures used in the self-management program. This program and then was assessed using the content validity index (CVI) and a four-point Liker's scale. The content validity score was .98. The guideline of self-management program to CKD was thus developed. This study developed a self-management program applicable to local care of CKD. It is hoped that the guidelines developed in this study offer a reference for clinical caregivers to improve their healthcare practices.

  3. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  4. The Development of Productivity Practical Management Model at Automotive Mechanical Technology Skill Program in Semarang Vocational Schools, Indonesia

    ERIC Educational Resources Information Center

    Hadromi; Rachman, Maman; Soesanto; Kartana, Tri Jaka

    2015-01-01

    The purpose of this research is to develop automotive Mechanical Technology Skill Program (TMO) in Vocational School. The Research and Development (R&D) object was done in SMK 1, 4 and 7 Semarang, Indonesia. The result was achieved productivity Practical Management Final Model at TMO skill Program in Vocational school named momanticproter.…

  5. 77 FR 69765 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... revised program application, subject to the limitations of the Hazardous and Solid Waste Amendments of... under the authority of sections 2002(a), 3006, and 7004(b) of the Solid Waste Disposal Act as amended 42...

  6. 10 CFR 709.17 - Final disposition of CI evaluation findings and recommendations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and recommendations. (a) Following completion of a CI evaluation, the Director of the Office of Intelligence and Counterintelligence must recommend, in writing, to the appropriate Program Manager that the covered person's access be approved or retained, or denied or revoked. (b) If the Program Manager agrees...

  7. 40 CFR 272.1151 - State-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management and Budget's Publication Office, 7461 Crowner Drive, Lansing, Michigan 48913, Phone: (517) 322..., DC 20460. Phone: (202) 382-5926; U.S. EPA, Region V, Waste, Pesticides and Toxics Division, Program Management Branch, 7th floor, 77 West Jackson Boulevard, Chicago, IL. Phone: Ms. Judy Feigler, (312) 886-4179...

  8. 78 FR 79654 - Vermont: Proposed Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ...EPA proposes to grant final authorization to the State of Vermont for changes to its hazardous waste program. In the ``Rules and Regulations'' section of this Federal Register we are authorizing the changes to the Vermont hazardous waste program under the Resource Conservation and Recovery Act (RCRA) as a direct final rule without prior proposed rule. EPA has determined that these changes satisfy all requirements needed to qualify for final authorization. If we receive no adverse comment, we will not take further action on this proposed rule.

  9. 76 FR 23498 - Suspension of Community Eligibility

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 64 [Docket ID FEMA... Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: This rule identifies communities, where the... floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives...

  10. Quantification of the benefits of access management for Kentucky : final report.

    DOT National Transportation Integrated Search

    2006-07-01

    This report describes the benefits quantification performed for the proposed access management plan for Kentucky. This study evaluates the capacity, safety and economic impacts associated with access management programs. The proposed Kentucky access ...

  11. Development of an Individualized and Group Instructional Program Based on Financial Management for Adult/Young Farmers in Vocational Agriculture Programs in Missouri. Final Report.

    ERIC Educational Resources Information Center

    Nolting, Greg; And Others

    A study was conducted to develop competency-based curriculum materials and a computer-based analysis system for farm business records to assist local vocational agriculture teachers of adult/young farmers in their group and individualized instructional programs. A list of thirty-five competencies in financial management were validated using…

  12. 78 FR 27 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ...-2012-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  13. 75 FR 78926 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ...-2010-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  14. 77 FR 74610 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-17

    ...-2012-0003] Final Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Final rule. SUMMARY: Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made... effect in order to qualify or remain qualified for participation in the National Flood Insurance Program...

  15. Suspension of enrollment in the Federal Employees Health Benefits (FEHB) Program for Peace Corps volunteers. Final rule.

    PubMed

    2006-11-17

    The Office of Personnel Management is issuing a final regulation to allow Peace Corps volunteers who are FEHB Program enrolled annuitants, survivors, and former spouses to suspend their FEHB enrollments and then return to the FEHB Program during the Open Season, or return to FEHB coverage immediately, if they involuntarily lose health benefits coverage under the Peace Corps. The intent of this final rule is to allow these beneficiaries to avoid the expense of continuing to pay FEHB Program premiums while they have other health coverage as Peace Corps volunteers, without endangering their ability to return to the FEHB Program in the future.

  16. EPA Region 2 SEMS_CERCLIS Sites All [R2] and SEMS_CERCLIS Sites NPL [R2] GIS Layers

    EPA Pesticide Factsheets

    The Region 2 SEMS_CERCLIS Sites All [R2] GIS layer contains unique Superfund Enterprise Management System (SEMS) site records. These records have the following NPL_STATUS designations: CURRENTLY ON FINAL NPL, DELETED FROM FINAL NPL, NOT ON NPL, PROPOSED FOR NPL, REMOVED FROM PROPOSED NPL, and SITE IS PART OF NPL SITE. The Region 2 SEMS_CERCLIS NPL Sites [R2] GIS layer only has SEMS records with the following NPL_STATUS designations: 'CURRENTLY ON FINAL NPL', 'DELETED FROM FINAL NPL', 'PROPOSED FOR NPL'.The Superfund Enterprise Management System (SEMS) is EPA's official record for tracking hazardous waste sites, potentially hazardous waste sites, and remedial activities performed in support of the Superfund Program across the nation. This includes sites that are on the National Priorities List (NPL) or are being considered for the NPL. SEMS represents a joint development and ongoing collaboration between Superfund's Remedial, Removal, Federal Facilities, Enforcement, and Emergency Response programs. It provides its wide audience base with a means of ongoing analysis of Superfund Program activities and informational needs at the site, regional management, and national management levels. The customers of SEMS or SEMS data are five EPA Headquarters offices and regional staff, citizens, the regulated community, other Federal agencies, States, Tribes, local agencies, and industry. SEMS stakeholders are States, Congress, other Federal agencies, industry groups, and cit

  17. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  18. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  19. Traffic management centers : the state-of-the-practice : task A : final working paper for design of support systems for advanced traffic management systems

    DOT National Transportation Integrated Search

    1999-02-01

    The goal of the Federal Highway Administration (FHWA) Expert Systems for Crash Data Collection Program was to use expert system technology to improve the accuracy and consistency of police-reported data. The program included the development and evalu...

  20. 24 CFR 200.935 - Administrator qualifications and procedures for HUD building products certification programs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... guidelines in any quality assurance review: (1) ASQC Q9000-1-1994 Quality Management and Quality Assurance... Systems—Model for Quality Assurance in Final Inspection and Test; (5) ASQC Q9004-1-1994 Quality Management... in interpreting testing standards, test methods, evaluating test reports and quality control programs...

  1. 10 CFR 709.16 - Application of Counterintelligence Evaluation Review Boards in reaching conclusions regarding CI...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... his/her designee) and includes representation from the appropriate line Program Managers, lab/site... site or operations office. (c) Process. When making a final recommendation under § 709.17 of this part, to a Program Manager, the Director of Intelligence and Counterintelligence shall report on the...

  2. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    PubMed

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  3. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  4. [Problems in implementing a pain management program for rheumatoid patients and studies of its effectiveness].

    PubMed

    Cziske, R; Jäckel, W; Jacobi, E

    1987-01-01

    A pain management program is presented which enables patients to reduce pain by means of relaxation and attention-diversion, etc. The problems arising from applying a psychological training to organic diseases, and the most favourable therapist's behaviour in facing these difficulties are elucidated. Finally, controlled studies are cited showing that pain can be reduced and the emotional state improved by pain management techniques.

  5. 78 FR 70255 - West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ..., and they will not take effect. We will then respond to public comments in a later final rule based on..., U.S. EPA Region III, 1650 Arch Street, Philadelphia, PA 19103-2029. 4. Hand Delivery: At the..., Office of State Programs, U.S. EPA Region III, 1650 Arch Street, Philadelphia, PA 19103-2029, Phone...

  6. Federal employees health benefits program; revision of contract cost principles and procedures, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The U.S. Office of Personnel Management (OPM) is issuing a final regulation amending the Federal Employees Health Benefits (FEHB) Acquisition Regulation (FEHBAR). This regulation provides additional contract cost principles and procedures for FEHB Program experience-rated contracts and is intended to clarify our requirements and enhance our oversight of FEHB carriers.

  7. Semiautomated Management Of Arriving Air Traffic

    NASA Technical Reports Server (NTRS)

    Erzberger, Heinz; Nedell, William

    1992-01-01

    System of computers, graphical workstations, and computer programs developed for semiautomated management of approach and arrival of numerous aircraft at airport. System comprises three subsystems: traffic-management advisor, used for controlling traffic into terminal area; descent advisor generates information integrated into plan-view display of traffic on monitor; and final-approach-spacing tool used to merge traffic converging on final approach path while making sure aircraft are properly spaced. Not intended to restrict decisions of air-traffic controllers.

  8. Final Environmental Impact Statement Establishment and Operation of an Intelligence, Surveillance, Reconnaissance, and Strike Capability Andersen Air Force Base, Guam

    DTIC Science & Technology

    2007-01-01

    Mariana Fruit Bat Pup Recruitment at Pati Point Colony; • Brown Tree Snake Interdiction and Control; and • Adaptive Management and Ground Track...establishment of a mitigation monitoring plan and adaptive management program. FUTURE ACTIONS As discussed in the Final EIS, the Air Force recognizes that...would initiate modifications to aircraft ground tracks and profiles over sensitive areas through an adaptive management strategy. This adaptive

  9. 44 CFR 67.9 - Final determination in the absence of an appeal by the community.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program APPEALS FROM PROPOSED FLOOD ELEVATION DETERMINATIONS § 67.9 Final determination in the...

  10. 44 CFR 67.9 - Final determination in the absence of an appeal by the community.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program APPEALS FROM PROPOSED FLOOD ELEVATION DETERMINATIONS § 67.9 Final determination in the...

  11. Simulation of Behavioral Variations in the Submission of Student Financial Statements: Effects on BEOG Costs. Stage I Draft Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume IV).

    ERIC Educational Resources Information Center

    Ellis, Richard

    Volume IV of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant (BEOG) programs deals with a set of simulated modifications in the statements made by BEOG applicants about their financial circumstances. Various kinds of misrepresentation of income, assets, and other factors are postulated, and the…

  12. A management system for evaluating the Virginia periodic motor vehicle inspection program : software manual and implementation procedures : final report.

    DOT National Transportation Integrated Search

    1978-01-01

    This report deals with the Periodic Motor Vehicle Inspection Management Evaluation System software documentation and implementation procedures. A companion report entitled "A Management System for Evaluating the Virginia Periodic Motor Vehicle Inspec...

  13. Federal employees health benefits program modification of eligibility to certain employees on temporary appointments and certain employees on seasonal and intermittent schedules. Final rule.

    PubMed

    2014-10-17

    The United States Office of Personnel Management (OPM) is issuing a final rule to modify eligibility for enrollment under the Federal Employees Health Benefits (FEHB) Program to certain temporary, seasonal, and intermittent employees who are identified as full-time employees. This final rule follows a notice of proposed rulemaking published July 29, 2014. This regulation will allow newly eligible Federal employees to enroll no later than January 2015.

  14. Redding Responder phase I final report.

    DOT National Transportation Integrated Search

    2005-12-19

    The Redding Responder Study was initiated as a component of the Redding Incident : Management Enhancement (RIME) Program. The goals of the RIME program are to leverage : technology and communications deployments for emergency communication providers ...

  15. A Management Workshop for Institutional Administrators in Optometric and Podiatric Education. Final Report and Compendium of Presentation Papers and Related Materials.

    ERIC Educational Resources Information Center

    Smith, Lee W.; Muntone, John C.

    A final report and compendium of presentation papers and related materials on a management workshop for institutional administrators in optometric and podiatric education is presented. Place and dates of the workshop are listed as are the participants, and the program agenda is provided. A synopsis of the curriculum content of the workshop…

  16. Vocational Curriculum Modification. Teaching Technical Language to Learning Handicapped Students. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 1.

    ERIC Educational Resources Information Center

    Gardner, David C.; And Others

    Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…

  17. Management of radioactive material safety programs at medical facilities. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camper, L.W.; Schlueter, J.; Woods, S.

    A Task Force, comprising eight US Nuclear Regulatory Commission and two Agreement State program staff members, developed the guidance contained in this report. This report describes a systematic approach for effectively managing radiation safety programs at medical facilities. This is accomplished by defining and emphasizing the roles of an institution`s executive management, radiation safety committee, and radiation safety officer. Various aspects of program management are discussed and guidance is offered on selecting the radiation safety officer, determining adequate resources for the program, using such contractual services as consultants and service companies, conducting audits, and establishing the roles of authorized usersmore » and supervised individuals; NRC`s reporting and notification requirements are discussed, and a general description is given of how NRC`s licensing, inspection and enforcement programs work.« less

  18. Matrix management in hospitals: testing theories of matrix structure and development.

    PubMed

    Burns, L R

    1989-09-01

    A study of 315 hospitals with matrix management programs was used to test several hypotheses concerning matrix management advanced by earlier theorists. The study verifies that matrix management involves several distinctive elements that can be scaled to form increasingly complex types of lateral coordinative devices. The scalability of these elements is evident only cross-sectionally. The results show that matrix complexity is not an outcome of program age, nor does matrix complexity at the time of implementation appear to influence program survival. Matrix complexity, finally, is not determined by the organization's task diversity and uncertainty. The results suggest several modifications in prevailing theories of matrix organization.

  19. 77 FR 71004 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ..., which begins with, ``Office of Business Management and Transformation (AJJ),'' delete the second and... Department-wide multi- sector workforce management activities previously performed by the Office of Business Management and Transformation to the Program Support Center. Finally, this notice also updates information...

  20. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  1. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Hazardous Waste Management System; Testing and Monitoring Activities (Checklist 158) 62 FR 32452 June 13... Management System; Carbamate Production, Identification and Listing of Hazardous Waste; Land Disposal... Indiana Department of Environmental Management, signed by the Commissioner of the IDEM on February 14...

  2. Computer-Based Educational Software System. Final Report.

    ERIC Educational Resources Information Center

    Brandt, Richard C.; Davis, Bradley N.

    CBESS (Computer-Based Educational Software System) is a set of 22 programs addressing authoring, instructional delivery, and instructional management. The programs are divided into five groups: (1) Computer-Based Memorization System (CBMS), which helps students acquire and maintain declarative (factual) knowledge (11 programs); (2) Language Skills…

  3. 30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...

  4. Institute for Training in Library Management and Communication Skills. Final Report.

    ERIC Educational Resources Information Center

    Chang, Henry C.; And Others

    An institute held December 10-16, 1978, in the United States Virgin Islands, trained 25 middle-level library administrators in the use of communications as a management tool. The institute was part of an on-going program of staff development in a multi-cultural, disadvantaged area. The program was based on these objectives: (1) to introduce basic…

  5. Design of a Model Management Information System (MIS) for California's Regional Occupational Centers and Programs. Final Report.

    ERIC Educational Resources Information Center

    Dick, James C.; And Others

    The management information system (MIS) development project for California's Regional Occupational Centers and Programs (ROC/Ps) was conducted in 3 phases over a 12-month period. Phase I involved a literature review and field study to match MIS design features and development strategy with existing conditions in ROC/Ps. A decision support system…

  6. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - calibration Report for Phoenix Testbed : Final Report. [supporting datasets - Phoenix Testbed

    DOT National Transportation Integrated Search

    2017-07-26

    The datasets in this zip file are in support of FHWA-JPO-16-379, Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Program...

  7. 76 FR 68499 - Draft WaterSMART Cooperative Watershed Management Program Funding Opportunity Announcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... local watersheds through collaborative conservation. We plan to publish a final announcement as soon as... watershed needs. Through this program, we provide Federal leadership and assistance on; Efficient use of...

  8. A pavement management research program for Oregon highways : final report.

    DOT National Transportation Integrated Search

    1989-12-01

    An extensive program was developed to measure pavement deflection skid resistance, and rideability throughout Oregon. The data from those "objective" measures were then evaluated for correlations with observed pavement distress and traffic factors. :...

  9. 76 FR 3831 - Crew Resource Management Training for Crewmembers in Part 135 Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    ... training in the use of crew resource management principles, as appropriate for their operation. This final...; Amendment No.: 135-122] RIN 2120-AJ32 Crew Resource Management Training for Crewmembers in Part 135... include in their training programs crew resource management training for crewmembers, including pilots and...

  10. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pava, Daniel S.

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less

  11. 76 FR 72431 - Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency [Docket ID FEMA-2008-0022... Preparedness Program Manual AGENCY: Federal Emergency Management Agency, DHS. ACTION: Notice of availability. SUMMARY: The Federal Emergency Management Agency (FEMA) is issuing two final guidance documents...

  12. Student War Loans Program: Final Report. Bulletin, 1946, No. 14

    ERIC Educational Resources Information Center

    Flynt, R. C. M.

    1946-01-01

    The Student War Loans Program, officially "Loans to Students in Technical and Professional Fields (National Defense)," was one of five essential wartime programs administered by the U. S. Office of Education. The Division of Higher Education administered two of these programs, namely, the Engineering, Science and Management War Training Program…

  13. 78 FR 55061 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-09

    ... paper on GOA Trawl Bycatch Management; Final action on GOA Trawl Data Collection; Initial review of GOA... following issues: 1. BS/AI Crab 2. Groundfish Specifications 3. Observer Program 4. GOA Trawl Issues In...

  14. Implementation of transportation asset management in Grandview, Missouri : final report.

    DOT National Transportation Integrated Search

    2017-02-01

    The successful implementation of transportation asset management (TAM) by local governments facilitates the optimization of limited resources. The use of a data-driven TAM program helps to identify and prioritize needs, identify and dedicate resource...

  15. Individualized Foreign Language Program.

    ERIC Educational Resources Information Center

    Joint School District No. 1, West Bend, WI.

    A summary of project objectives, procedures, and dissemination is developed in this report of work initiated in June 1968. Programs in French, German, and Spanish for students in junior and senior high schools are evaluated with special reference to attitudes, aptitude, achievement, and program management. A final section reviews procedures and…

  16. NASA/Drexel program. [research effort in large-scale technical programs management for application to urban problems

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The results are reported of the NASA/Drexel research effort which was conducted in two separate phases. The initial phase stressed exploration of the problem from the point of view of three primary research areas and the building of a multidisciplinary team. The final phase consisted of a clinical demonstration program in which the research associates consulted with the County Executive of New Castle County, Delaware, to aid in solving actual problems confronting the County Government. The three primary research areas of the initial phase are identified as technology, management science, and behavioral science. Five specific projects which made up the research effort are treated separately. A final section contains the conclusions drawn from total research effort as well as from the specific projects.

  17. 15 CFR 923.60 - Review/approval procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL RESOURCE... management program are not required, OCRM will prepare draft and final environmental impact statements, in... preparation and dissemination of draft and final environmental impact statements and lengthy Federal agency...

  18. Transportation asset management : organizational performance and risk review : final report.

    DOT National Transportation Integrated Search

    2012-11-15

    The 2012 Federal reauthorization of surface transportation programs, Moving Ahead for Progress in the 21st : Century (MAP-21) formally introduced performance-based decision making for investments in surface : transportation programs. This report revi...

  19. The Industrial Base and National Security: A New Strategy

    DTIC Science & Technology

    1993-04-01

    addresses this issue in her article entitled, " Managing Innovation on the Factory Floor": Manufacturing managers often buy the most advanced...Incentives Program." Government Contract Number MDA903-85-C-0139 Final Report, 1986. 31 11. Tyre, Marcie J. " Managing Innovation On The Factory Floor

  20. 76 FR 10338 - Evaluation of State Coastal Management Programs and National Estuarine Research Reserves

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Evaluation of State Coastal... Administration (NOAA), Office of Ocean and Coastal Resource Management, National Ocean Service, Commerce. ACTION... to its Reserve final management plan approved by the Secretary of Commerce, and adhered to the terms...

  1. The Development and Validation of a Special Education Intelligent Administration Support Program. Final Report.

    ERIC Educational Resources Information Center

    Utah State Univ., Logan. Center for Persons with Disabilities.

    This project studied the effects of implementing a computerized management information system developed for special education administrators. The Intelligent Administration Support Program (IASP), an expert system and database program, assisted in information acquisition and analysis pertaining to the district's quality of decisions and procedures…

  2. Massachusetts Workplace Education Initiative. Year 3 Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Rayman, Paula; And Others

    An evaluation of the Massachusetts Workplace Education Initiative brings together three phases: (1) a pilot outcome study conducted with a sample of six local workplace education programs and featuring the perspectives of workers, labor, and management; (2) program profiles for seven federally funded workplace education programs coordinated by the…

  3. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  4. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  5. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  6. 20 CFR 411.250 - How will SSA evaluate a PM?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 411.250 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM Use of One or More Program Managers To Assist in Administration of the Ticket to Work Program... determine the PM's final rating. (c) These performance evaluations will be made part of our database on...

  7. Incident management assistance patrols - assessment of benefits/costs, route selection, and prioritization : final report.

    DOT National Transportation Integrated Search

    2016-09-21

    The North Carolina Department of Transportation's (NCDOTs) Incident Management Assistance Patrol (IMAP) program provides a critically important service to North Carolinas traveling public. The highly trained and well-equipped IMAP operators pro...

  8. Idea Project Final Report, Passive Optical Lane Position Monitor

    DOT National Transportation Integrated Search

    1996-01-01

    INTELLIGENT VEHICLE INITIATIVE OR IVI : THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM, WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUS...

  9. 40 CFR 272.2201 - Texas State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Program, June, 2005. Copies of the document can be obtained from U.S. EPA Region 6, 1445 Ross... Statement dated November 21, 1986, July 21, 1988, December 4, 1989, April 11, 1990, July 31, 1991, February...

  10. 78 FR 33986 - Indiana: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R05-RCRA-2012-0377; FRL-9817-9] Indiana... Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is granting the State of Indiana final... and copy Indiana's application from 9:00 a.m. to 4:00 p.m. at the following addresses: U.S. EPA Region...

  11. 75 FR 57188 - Rhode Island: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... regarding EPA's Zinc Fertilizer Rule in a separate final rule (following the proposed rule) as it... the Zinc Fertilizer Rule. Today's action responds to that comment but does not agree with it and, thus, finalizes the Agency's decision to authorize Rhode Island for EPA's Zinc Fertilizer Rule. In addition, the...

  12. Development of a self-management program for employees with complaints of the arm, neck, and/or shoulder: an intervention mapping approach.

    PubMed

    Hutting, Nathan; Detaille, Sarah I; Engels, Josephine A; Heerkens, Yvonne F; Staal, J Bart; Nijhuis-van der Sanden, Maria Wg

    2015-01-01

    To develop a self-management program with an additional eHealth module, using the six steps of the intervention mapping (IM) protocol, to help employees with complaints of the arm, neck, and/or shoulder (CANS) cope with their problems. In Step 1 of the IM protocol, a needs assessment was performed consisting of a review of the Dutch multidisciplinary guidelines on CANS, and of focus group sessions with employees with CANS (n=15) and with relevant experts (n=17). After the needs assessment, the objectives of the intervention and the determinants of self-management at work were formulated (Step 2). Furthermore, theory-based intervention methods and practical strategies were selected (Step 3), and an intervention program (including the eHealth module) was developed (Step 4). Finally, plans for implementation and evaluation of the program were developed (Steps 5 and 6). Step 1 of the IM protocol revealed that employees with CANS should be stimulated to search for information about the cause of their complaints, about how to deal with their complaints, and in which manner they can influence their complaints themselves. In Step 2, the overall goal of the intervention was defined as "self-management behavior at work" with the aim to alleviate the perceived disability of the participants. Step 3 described how the intervention methods were translated into practical strategies, and goal setting was introduced as an important method for increasing self-efficacy. The product of Step 4 was the final program plan, consisting of 6-weekly group sessions of 2.5 hours each and an eHealth module. In Step 5, a recruitment plan and course materials were developed, a steering committee was set up, trainers were recruited, and the final program was tested. In Step 6, an evaluation plan was developed, which consists of a randomized controlled trial with a 12-month follow-up period and a qualitative evaluation (interviews) with some of the participants. This study resulted in a theory- and practice-based self-management program, based on behavioral change theories, guideline-related evidence, and practice-based knowledge that fits the needs of employees with CANS.

  13. Warrants, design, and safety of road ranger service patrols : draft final report.

    DOT National Transportation Integrated Search

    2016-11-01

    This research project created a decision support system for managers who must decide if a roadway warrants the addition of the Safety Service Patrol (SSP). Meetings with Florida Department of Transportation (FDOT) service patrol program manager...

  14. 44 CFR 67.10 - Rates during pendency of final determination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program APPEALS FROM PROPOSED FLOOD ELEVATION DETERMINATIONS § 67.10 Rates during pendency of final... a participating community shall be denied the right to purchase flood insurance at the subsidized...

  15. Idea Project Final Report, Driver-Adaptive Warning System

    DOT National Transportation Integrated Search

    1995-03-31

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM, WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULTS FOR THE DEVEL...

  16. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  17. Idea Project Final Report, Laser Vehicle Detector-Classifier

    DOT National Transportation Integrated Search

    1995-11-28

    WEIGH-IN-MOTION OR WIM, COMMERCIAL VEHICLE OPERATIONS OR CVO : THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM, WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFAC...

  18. 75 FR 43478 - Rhode Island: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... submitting comments. E-mail: biscaia.robin@epa.gov . Fax: (617) 918-0642, to the attention of Robin Biscaia. Mail: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07... Delivery or Courier: Deliver your comments to: Robin Biscaia, RCRA Waste Management Section, Office of Site...

  19. [Impact of interventions in the pressure ulcer rate].

    PubMed

    Araya Farías, I; Febré, N

    To evaluate the impact of a risk management program for prevention of pressure ulcers (PUs) in an adult Intensive Care Unit (ICU). A quantitative, prospective study performed with a «before and after» evaluation, and designed in three stages: 1) PU incidence study; 2) Intervention by implementing a risk management program, and 3) Assessment of the impact. Adherence to the preventive measures showed a significant increase (11.7%) between the first month of the program and the final month (58.5%) of the assessment. Initial PU rate was 20.9, with a decrease in the rate to 14.0 per 1000 bed occupancy days (P<.05) after the risk management program. The data show that the risk management program, using prevention measures, was effective in reducing the rate of PU in the period under study by more than 33%. Copyright © 2017 SECA. Publicado por Elsevier España, S.L.U. All rights reserved.

  20. Disease management programs for CKD patients: the potential and pitfalls.

    PubMed

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  1. Study 2.5 final report. DORCA computer program. Volume 4: Executive summary report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The functions and capabilities of the Dynamic Operational Requirements and Cost Analysis Program are explained. The existence and purpose of the program are presented to provide an evaluation of program applicability to areas of responsibility for potential users. The implementation of the program on the Univac 1108 computer is discussed. The application of the program for mission planning and project management is described.

  2. Preparation of Leadership Personnel: Combined Deaf Education/Learning Disabilities. Final Performance Report.

    ERIC Educational Resources Information Center

    Luetke-Stahlman, Barbara

    This report describes activities and accomplishments of a four-year project to develop a doctoral program at the University of Kansas Medical Center to prepare teacher educators, researchers, supervisors/managers, and clinicians in programs in either deafness or learning disabilities and in a combined deafness and learning disabilities program.…

  3. Access management research and awareness program : phase IV final report

    DOT National Transportation Integrated Search

    1999-11-01

    Access management involves balancing the dual roles that roadways must play - through travel and access to property and economic activity. When these roles are not in proper balance, the result is a roadway system that functions sub-optimally. The Io...

  4. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  5. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  6. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  7. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  8. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  9. 5 CFR 890.1071 - Further appeal rights after final decision to impose penalties and assessments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administrative Sanctions Imposed Against Health Care Providers Civil Monetary Penalties and... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Further appeal rights after final...

  10. 5 CFR 890.1071 - Further appeal rights after final decision to impose penalties and assessments.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administrative Sanctions Imposed Against Health Care Providers Civil Monetary Penalties and... 5 Administrative Personnel 2 2014-01-01 2014-01-01 false Further appeal rights after final...

  11. 5 CFR 890.1071 - Further appeal rights after final decision to impose penalties and assessments.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administrative Sanctions Imposed Against Health Care Providers Civil Monetary Penalties and... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Further appeal rights after final...

  12. 5 CFR 890.1071 - Further appeal rights after final decision to impose penalties and assessments.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administrative Sanctions Imposed Against Health Care Providers Civil Monetary Penalties and... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Further appeal rights after final...

  13. 5 CFR 890.1071 - Further appeal rights after final decision to impose penalties and assessments.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES HEALTH BENEFITS PROGRAM Administrative Sanctions Imposed Against Health Care Providers Civil Monetary Penalties and... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Further appeal rights after final...

  14. 77 FR 27435 - Certain Frozen Fish Fillets From the Socialist Republic of Vietnam: Final Results of the New...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ..., through Matthew Renkey, Acting Program Manager, AC/CVD Operations, Office 9, from Emeka Chukwudebe, Case... after the date of publication of the final results of review. Pursuant to 19 CFR 351.212(b)(1), we will...

  15. 76 FR 15941 - Certain Frozen Fish Fillets From the Socialist Republic of Vietnam: Final Results of the Sixth...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... ``Memorandum to the File, through Alex Villanueva, Program Manager, AC/CVD Operations, Office 9, from Javier... the date of publication of the final results of review. Pursuant to 19 CFR 351.212(b)(1), we will...

  16. 78 FR 14577 - Final Flood Hazard Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... regulatory floodways on the Flood Insurance Rate Maps (FIRMs) and where applicable, in the supporting Flood Insurance Study (FIS) reports have been made final for the communities listed in the table below. The FIRM... participation in the Federal Emergency Management Agency's (FEMA's) National Flood Insurance Program (NFIP). In...

  17. Patient Protection and Affordable Care Act; establishment of the Multi-State Plan Program for the Affordable Insurance Exchanges. Final rule.

    PubMed

    2014-02-24

    The U.S. Office of Personnel Management (OPM) is issuing a final rule implementing modifications to the Multi-State Plan (MSP) Program based on the experience of the Program to date. OPM established the MSP Program pursuant to the Affordable Care Act. This rule clarifies the approach used to enforce the applicable standards of the Affordable Care Act with respect to health insurance issuers that contract with OPM to offer MSP options; amends MSP standards related to coverage area, benefits, and certain contracting provisions under section 1334 of the Affordable Care Act; and makes non-substantive technical changes.

  18. Feasibility study of a campus-based bikesharing program at UNLV : final report.

    DOT National Transportation Integrated Search

    2017-07-01

    Bikesharing systems have been deployed worldwide as a transportation demand management strategy to encourage active modes and reduce single-occupant vehicle travel. These systems have been deployed at universities, both as part of a city program or a...

  19. Idea Project Final Report, Autoalert: Automated Acoustic Detection Of Incidents

    DOT National Transportation Integrated Search

    1995-12-26

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM, WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULTS FOR THE DEVEL...

  20. Idea Project Final Report, Three-In-One Vehicle Operator Sensor

    DOT National Transportation Integrated Search

    1995-09-30

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  1. Idea Project Final Report, An Improved Metropolitan Area Transportation System (Imats)

    DOT National Transportation Integrated Search

    1995-01-20

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM, WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULTS FOR THE DEVEL...

  2. Final Guidance on Awards of Grants to Indian Tribes under Section 106 of the Clean Water Act

    EPA Pesticide Factsheets

    Guidance to help tribal water quality program managers, staff, and other tribal environmental decision makers design and implement effective and successful water quality programs. Also assists EPA Regions to award and administer tribal grants.

  3. Disease management for chronically ill beneficiaries in traditional Medicare.

    PubMed

    Bott, David M; Kapp, Mary C; Johnson, Lorraine B; Magno, Linda M

    2009-01-01

    We summarize the Centers for Medicare and Medicaid Services' (CMS's) experience with disease management (DM) in fee-for-service Medicare. Since 1999, the CMS has conducted seven DM demonstrations involving some 300,000 beneficiaries in thirty-five programs. Programs include provider-based, third-party, and hybrid models. Reducing costs sufficient to cover program fees has proved particularly challenging. Final evaluations on twenty programs found three with evidence of quality improvement at or near budget-neutrality, net of fees. Interim monitoring covering at least twenty-one months on the remaining fifteen programs suggests that four are close to covering their fees. Characteristics of the traditional Medicare program present a challenge to these DM models.

  4. Cost allocation methodology applicable to the temporary assistance for needy families program. Final rule.

    PubMed

    2008-07-23

    This final rule applies to the Temporary Assistance for Needy Families (TANF) program and requires States, the District of Columbia and the Territories (hereinafter referred to as the "States") to use the "benefiting program" cost allocation methodology in U.S. Office of Management and Budget (OMB) Circular A-87 (2 CFR part 225). It is the judgment and determination of HHS/ACF that the "benefiting program" cost allocation methodology is the appropriate methodology for the proper use of Federal TANF funds. The Personal Responsibility and Work Opportunity Reconciliation Act (PRWORA) of 1996 gave federally-recognized Tribes the opportunity to operate their own Tribal TANF programs. Federally-recognized Indian tribes operating approved Tribal TANF programs have always followed the "benefiting program" cost allocation methodology in accordance with OMB Circular A-87 (2 CFR part 225) and the applicable regulatory provisions at 45 CFR 286.45(c) and (d). This final rule contains no substantive changes to the proposed rule published on September 27, 2006.

  5. Mithras Studies of the Boundary Between Open and Closed Field Lines.

    DTIC Science & Technology

    1994-01-31

    I ¸ . . A- : - Final Report • March 1995 MITHRAS STUDIES OF THE BOUNDARY BETWEEN OPEN AND CLOSED FIELD LINES John D. Kelly, Program Manager Richard A...Kelly, Program Manager Richard A. Doe, Research Physicist Geoscience and Engineering Center SRI Project 3245 Prepared for: Department of the Air...characteristic energy, energy flux, and an estimate for upward field-aligned current. On the basis of coordinated radar/optical experiments, Vallance Jones et al

  6. 78 FR 20625 - Spent Nuclear Fuel Management at the Savannah River Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... processing is a chemical separations process that involves dissolving spent fuel in nitric acid and... Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact... chemical properties, and radionuclide inventory. The fuel groups and the seven technologies that could be...

  7. Connected Vehicle Pilot Deployment Program phase 1 : security management operating concept : New York City : final report.

    DOT National Transportation Integrated Search

    2016-05-18

    This document describes the Security Management Operating Concept (SMOC) for the New York City Department of Transportation (NYCDOT) Connected Vehicle Pilot Deployment (CVPD) Project. This SMOC outlines the security mechanisms that will be used to pr...

  8. 77 FR 61326 - Indiana: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-09

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R05-RCRA-2012-0377; FRL-9739-6] Indiana... Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: Indiana has applied to EPA for Final Authorization...). EPA has reviewed Indiana's application with regards to federal requirements, and is proposing to...

  9. 76 FR 37048 - Louisiana; Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... the preamble to the immediate final rule. Unless we get written comments which oppose this... your written comments by July 25, 2011. ADDRESSES: Send written comments to Alima Patterson, Region 6... hand delivery/courier; please follow the detailed instructions in the ADDRESSES section of the...

  10. A New Look at Preservice Teachers' Conceptions of Classroom Management and Organization: Uncovering Complexity and Dissonance

    ERIC Educational Resources Information Center

    Kaufman, Douglas; Moss, David M.

    2010-01-01

    This article examines preservice teachers' conceptions of classroom management and organization in light of their training and beliefs about good teaching. Students in their final year of a 5-year program discussed their definitions and conceptions of classroom management, organization, and rule systems through an open-ended questionnaire.…

  11. 76 FR 14376 - Evaluation of State Coastal Management Programs and National Estuarine Research Reserves

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Management (OCRM) announces its intent to evaluate the performance of the ACE Basin (South Carolina) National... Reserve final management plan approved by the Secretary of Commerce, and adhered to the terms of financial... CFR part 923, subpart L. The CZMA requires continuing review of the performance of States with respect...

  12. 75 FR 35720 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ...: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07-1... Restoration and Remediation (OSRR 07-1), EPA New England--Region 1, 5 Post Office Square, Suite 100, Boston... Management Section, Office of Site Remediation and Restoration (OSRR 07-1), EPA New England--Region 1, 5 Post...

  13. Cooperative Program and Facilities Planning, Southern Maine Vocational Technical Institute--University of Maine at Portland-Gorham. Final Report: Higher Education Facilities Planning Grant.

    ERIC Educational Resources Information Center

    Pressley, Warren H., Jr.

    In response to the great need for less than baccalaureate degree programs in Maine, a grant was made to finance the development of the three programs described here. Offered are a AA degree program in Hotel, Motel, and Restaurant Management, a program of inservice education in Respiratory Therapy which should serve as a model for programs in other…

  14. Idea Project Final Report, A Prototype System For Real-Time Incident Likelihood Prediction

    DOT National Transportation Integrated Search

    1995-02-28

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  15. Program Evaluation Grant. Final Report.

    ERIC Educational Resources Information Center

    Quadco Rehabilitation Center, Inc., Stryker, OH.

    The purpose of the project was to increase the effectiveness and efficiency of those rehabilitation facilities which were utilized by the Ohio Rehabilitation Services Commission (RSC) through the development, installation, and utilization of a program evaluation system and a management information system. The two systems were developed and…

  16. Development and field test of a responsible alcohol service program. Volume 3, Final results

    DOT National Transportation Integrated Search

    1988-08-01

    A Program of Responsible Alcohol Service was developed to enable servers and managers in establishments selling alcoholic beverages to exercise responsibility in their service of alcohol in order to prevent injury to and by intoxicated patrons. The P...

  17. TECHNICAL GUIDANCE DOCUMENT: INSPECTION TECHNIQUES FOR THE FABRICATION OF GEOMEMBRANE FIELD SEAMS

    EPA Science Inventory

    Subtitle C of the Resource Conservation and Recovery Act (RCRA) requires the U.S. Environmental Protection Agency (EPA) to establish a Federal hazardous waste management program. This program must ensure that hazardous wastes are handled safely from generation until final dispos...

  18. A survey of driver improvement programs in the fifty states : final report.

    DOT National Transportation Integrated Search

    1991-01-01

    In the fall of 1989, the content and statutory/regulatory provisions for other states' driver improvement programs were examined. This was done by both surveying the driver improvement managers in the various states and by conducting an analysis of t...

  19. Federal Employees Health Benefits Program: Removal of Eligible and Ineligible Individuals From Existing Enrollments. Final rule.

    PubMed

    2018-01-23

    The United States Office of Personnel Management (OPM) is issuing a final rule amending Federal Employees Health Benefits (FEHB) Program regulations to provide a process for removal of certain identified individuals who are found not to be eligible as family members from FEHB enrollments. This process would apply to individuals for whom there is a failure to provide adequate documentation of eligibility when requested. This action also amends Federal Employees Health Benefits (FEHB) Program regulations to allow certain eligible family members to be removed from existing self and family or self plus one enrollments.

  20. Wisconsin Workplace Partnership Training Program (National Workplace Literacy Program). June 1, 1992-December 31, 1993. Final Report.

    ERIC Educational Resources Information Center

    Wisconsin State Board of Vocational, Technical and Adult Education, Madison. Wisconsin Technical Coll. System.

    The Wisconsin Workplace Partnership Training Program involved the state's technical college system board, state chapter of the AFL-CIO, Wisconsin Manufacturers and Commerce, and Madison Center on Education and Work. The state-level education-labor-management partnership was mirrored at the local level in 28 worksite education centers. Instruction…

  1. 76 FR 13205 - Piedmont National Wildlife Refuge, Jones and Jasper Counties, GA; Final Comprehensive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ..., reptiles and amphibians. We will initiate basic inventories for fish species and invertebrates, including... maintain current fire management programs but intensify management of a 5,000-acre Piedmont savanna focus... (law enforcement), refuge operations specialist, prescribed fire/fuels technician, engineering...

  2. Idea Project Final Report, Efficient Use Of Narrowband Radio Channels For Mobile Digital Communications

    DOT National Transportation Integrated Search

    1996-02-05

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  3. Idea Project Final Report, Vehicle-To-Vehicle Communication For Collision Avoidance And Improved Traffic Flow

    DOT National Transportation Integrated Search

    1995-05-14

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  4. Idea Project Final Report, Development Of An Intelligent Air Brake Warning System For Commercial Vehicles

    DOT National Transportation Integrated Search

    1996-05-31

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  5. Human Research Program: 2010 Annual Report

    NASA Technical Reports Server (NTRS)

    2010-01-01

    2010 was a year of solid performance for the Human Research Program in spite of major changes in NASA's strategic direction for Human Spaceflight. Last year, the Program completed the final steps in solidifying the management foundation, and in 2010 we achieved exceptional performance from all elements of the research and technology portfolio. We transitioned from creating building blocks to full execution of the management tools for an applied research and technology program. As a team, we continue to deliver the answers and technologies that enable human exploration of space. While the Agency awaits strategic direction for human spaceflight, the Program is well positioned and critically important to helping the Agency achieve its goals.

  6. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    PubMed

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  7. Development of a self-management program for employees with complaints of the arm, neck, and/or shoulder: an intervention mapping approach

    PubMed Central

    Hutting, Nathan; Detaille, Sarah I; Engels, Josephine A; Heerkens, Yvonne F; Staal, J Bart; Nijhuis-van der Sanden, Maria WG

    2015-01-01

    Purpose To develop a self-management program with an additional eHealth module, using the six steps of the intervention mapping (IM) protocol, to help employees with complaints of the arm, neck, and/or shoulder (CANS) cope with their problems. Methods In Step 1 of the IM protocol, a needs assessment was performed consisting of a review of the Dutch multidisciplinary guidelines on CANS, and of focus group sessions with employees with CANS (n=15) and with relevant experts (n=17). After the needs assessment, the objectives of the intervention and the determinants of self-management at work were formulated (Step 2). Furthermore, theory-based intervention methods and practical strategies were selected (Step 3), and an intervention program (including the eHealth module) was developed (Step 4). Finally, plans for implementation and evaluation of the program were developed (Steps 5 and 6). Results Step 1 of the IM protocol revealed that employees with CANS should be stimulated to search for information about the cause of their complaints, about how to deal with their complaints, and in which manner they can influence their complaints themselves. In Step 2, the overall goal of the intervention was defined as “self-management behavior at work” with the aim to alleviate the perceived disability of the participants. Step 3 described how the intervention methods were translated into practical strategies, and goal setting was introduced as an important method for increasing self-efficacy. The product of Step 4 was the final program plan, consisting of 6-weekly group sessions of 2.5 hours each and an eHealth module. In Step 5, a recruitment plan and course materials were developed, a steering committee was set up, trainers were recruited, and the final program was tested. In Step 6, an evaluation plan was developed, which consists of a randomized controlled trial with a 12-month follow-up period and a qualitative evaluation (interviews) with some of the participants. Conclusion This study resulted in a theory- and practice-based self-management program, based on behavioral change theories, guideline-related evidence, and practice-based knowledge that fits the needs of employees with CANS. PMID:26170689

  8. People Management. Final Report of the People Management Committee

    DTIC Science & Technology

    1975-04-25

    Objective Memorandum Planning, Programming, C Budgeting System Personnel Priority Model Projected Requisitioning Authority Prior ServIce Quality ...April 1975 PREPARED FOR - G THE DEPARTMENT OF ARMY OFFICE OF THE DEPUTY CHIEF OF STAFF FOR PERSONNEL NATIONAL TECHNICAL INFORMATION SERVICE US... service accessions and reenllstees. (3) Manage the DEP. (4) Bolster systems discipline. d. RecommendetIons; (1) That manpower objectives

  9. 77 FR 47797 - Arkansas: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... the preamble to the immediate final rule. Unless we get written comments which oppose this... comment. If you want to comment on this action, you must do so at this time. DATES: Send your written comments by September 10, 2012. ADDRESSES: Send written comments to Alima Patterson, Region 6, Regional...

  10. 7 CFR 1710.115 - Final maturity.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... implementation of programs for demand side management and energy resource conservation and on and off grid renewable energy sources not owned by the borrower will be determined by RUS. Due to the uncertainty of... operation of a new system are a separate class of loans and usually have a final maturity of less than 10...

  11. 7 CFR 1710.115 - Final maturity.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... implementation of programs for demand side management and energy resource conservation and on and off grid renewable energy sources not owned by the borrower will be determined by RUS. Due to the uncertainty of... operation of a new system are a separate class of loans and usually have a final maturity of less than 10...

  12. 7 CFR 1710.115 - Final maturity.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementation of programs for demand side management and energy resource conservation and on and off grid renewable energy sources not owned by the borrower will be determined by RUS. Due to the uncertainty of... operation of a new system are a separate class of loans and usually have a final maturity of less than 10...

  13. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  14. 75 FR 12726 - Certain Frozen Fish Fillets from the Socialist Republic of Vietnam: Final Results of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ... Ray, Case Analyst, through Alex Villanueva, Program Manager, Final Results Analysis for QVD Food... administrative review and new shipper reviews include four companies, the mandatory respondents, QVD Food Company... upon our analysis of the comments and information received, we made changes to the dumping margin...

  15. Federal employees health benefits program: discontinuance of health plan in an emergency. Final regulation.

    PubMed

    2007-01-17

    The Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) regulations regarding discontinuance of a health plan to include situations in which a health plan becomes incapacitated, either temporarily or permanently, as the result of a disaster.

  16. Oregon regional intelligent transportation systems (ITS) integration program. Final phase III report, I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project

    DOT National Transportation Integrated Search

    2005-07-01

    This report presents the results of the evaluation of the I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project, a cooperative project between the Oregon Department of Transportation (ODOT) and the City of Portland to integr...

  17. MERC Report: State Management Evaluation Reviews for Compliance. Final Report.

    ERIC Educational Resources Information Center

    Sierra Planning and Research Associates, Reno, NV.

    A process assessment was conducted to determine the effectiveness of the procedure used by the Bureau of Occupational and Adult Education, U.S. Office of Education (USOE), in conducting State Management Evaluation Reviews for Compliance (MERC) with Federal legislation and regulations governing public vocational and adult education programs. The…

  18. Support for the development and implementation of an access management program through research and analysis of collision data : final report.

    DOT National Transportation Integrated Search

    2015-11-11

    The South Carolina Access and Roadside Management Standards (ARMS) provides standards and guidelines for : permitting access encroachments onto SCDOT right-of-way. In April, 2013, SCDOT initiated research that would be : used to update this manual wi...

  19. 75 FR 17155 - Preparation of an Environmental Assessment (EA) for Proposed Outer Continental Shelf (OCS) Oil...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ... all requirements of NEPA, the Coastal Zone Management Act, Outer Continental Shelf Lands Act, and... consistent with each affected state's federally approved Coastal Zone Management program. Finally, the MMS...-circulation modeling, ecological effects of oil and gas activities, and hurricane impacts on coastal...

  20. The Ohio Schools Pest Management Survey: A Final Report.

    ERIC Educational Resources Information Center

    2001

    In 2001, the Environmental Studies Senior Capstone Seminar class at Denison University helped the state of Ohio work to prevent harmful pesticide use in schools. In cooperation with Ohio State University's Integrated Pest Management (IPM) in Schools Program, Denison conducted a statewide survey of school districts to determine current pest…

  1. 40 CFR 272.2201 - Texas State-Administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...); Chapter 371, Texas Oil Collection, Management, and Recycling Act, sections 371.0025(b) and (c), 371.024(a..., Management, and Recycling Act, sections 371.021, 371.022, 371.024(e), 371.0245, 371.0246, 371.025, and 371... Designate New Treatment Subcategories for Radioactively Contaminated Cadmium, Mercury-Containing Batteries...

  2. 77 FR 9690 - Willamette Valley National Wildlife Refuge Complex, Corvallis, OR; Final Comprehensive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... sanctuary or for any other management purpose, for migratory birds * * * to conserve and protect migratory... program to provide forage for wintering Canada geese; Managing wetland habitats and providing sanctuary... area closed to wintertime public access to provide sanctuary during the wintering waterfowl season...

  3. Management of Classroom Behaviors: Perceived Readiness of Education Interns

    ERIC Educational Resources Information Center

    Garland, Dennis; Garland, Krista Vince; Vasquez, Eleazar, III

    2013-01-01

    Education students at a large research university participated in internships during their final semesters as part of their respective programs of study as a capstone experience. Qualitative and quantitative methods were used to collect data on the perceptions of interns' readiness and knowledge of evidence-based practices to manage classroom…

  4. Final test report for traffic management data dictionary (TMDD) and related standards as deployed by the Utah department of transportation.

    DOT National Transportation Integrated Search

    2008-05-23

    This report presents the results of the ITS Standards Testing Program for the field testing, assessment, and evaluation of the three volumes comprising the Standards for Traffic Management Center to Center Communications (TMDD) version 2.1 and the NT...

  5. 75 FR 8989 - Meeting Announcements: North American Wetlands Conservation Council; Neotropical Migratory Bird...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... Wildlife Service, on the strategic direction and management of the NMBCA program. Proposal due dates... Avenue L'Auberge, Lake Charles, LA 70601. FOR FURTHER INFORMATION CONTACT: Michael J. Johnson, Council... management projects for recommendation to, and final funding approval by, the Commission. Project proposal...

  6. Leadership development programs for health care middle managers: An exploration of the top management team member perspective.

    PubMed

    Whaley, Alan; Gillis, William E

    Hospitals throughout the United States establish leadership and management programs for their middle managers. Despite their pervasiveness and an increased emphasis on physician leadership, there is limited research regarding the development programs designed for clinical and nonclinical health care middle managers. Using two theoretical lenses, signaling and institutional theory, this exploratory study investigates mid-sized hospital development programs from the perspective of top management team (TMT) members. Our objective is to find out what types of programs hospitals have, how they are developed, and how they are evaluated. We conducted semistructured interviews with 13 TMT members in six purposefully selected hospitals and matched these interviews with program curricula. Careful coding of the data allowed us not only to show our data in a meaningful visual representation but also to show the progression of the data from raw form to aggregate themes in the qualitative research process. We identified four types of development programs used in the selected hospitals: (a) ongoing series, (b) curriculum-based, (c) management orientation, and (d) mentoring. Challenges existed in aligning the need for the program with program content. Communication occurred both through direct messaging regarding policies and procedures and through hidden signals. TMT members referenced other programs for guidance but were not always clear about what it is they wanted the programs to accomplish. Finally, there was limited program outcome measurement. Our small sample indicates that specific, structured, and comprehensive programs perform best. The better programs were always trying to improve but that most needed better accountability of tracking outcomes. In setting up a program, a collaborative approach among TMT members to establish what the needs are and how to measure outcomes worked well. Successful programs also tied in their leadership development with overall employee development.

  7. Idea Project Final Report, A Sequential Hypothesis Testing-Based Decision-Making System For Freeway Incident Response

    DOT National Transportation Integrated Search

    1995-10-01

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  8. 78 FR 57841 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... B. Guam Coral Reef Fish Productivity Susceptibility Analysis C. Hawaii Parrotfish Stock Assessment D... Project 2. Crown-of-Thorns Eradication Project 3. Coral Reef Monitoring Program Final Report E. Public.... Council Coral Reef Ecosystem Program and Proposal D. Revision and Re-Prioritization of the WPRFMC 5-Year...

  9. Idea Project Final Report, Engineered Visibility Warning Signals: Tests Of Time To React, Detectability, Identifiability And Salience

    DOT National Transportation Integrated Search

    1996-05-01

    THIS INVESTIGATION WAS COMPLETED AS PART OF THE ITS-IDEA PROGRAM WHICH IS ONE OF THREE IDEA PROGRAMS MANAGED BY THE TRANSPORTATION RESEARCH BOARD (TRB) TO FOSTER INNOVATIONS IN SURFACE TRANSPORTATION. IT FOCUSES ON PRODUCTS AND RESULT FOR THE DEVELOP...

  10. 77 FR 76034 - National Water Program 2012 Strategy: Response to Climate Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OW-2011-0943; FRL9716-6] National Water Program 2012... availability. SUMMARY: The Environmental Protection Agency (EPA) is publishing the final ``National Water...-term visions and goals for the management of water resources in light of climate change and charts key...

  11. 78 FR 79567 - Food Distribution Program on Indian Reservations: Income Deductions and Resource Eligibility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ...The final rule entitled Food Distribution Program on Indian Reservations: Income Deductions and Resource Eligibility was published on August 27, 2013. The Office of Management and Budget cleared the associated information collection requirements (ICR) on September 26, 2013. This document announces approval of the ICR.

  12. 75 FR 43409 - Rhode Island: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ..., nickel-cadmium batteries or lithium batteries. Rhode Island has decided to regulate circuit boards, as... universal waste program, Rhode Island regulates certain dry cell batteries (i.e., waste-nickel cadmium, mercuric oxide, and lead acid dry cell batteries), used electronics, mercury containing equipment and...

  13. Foreign Language/Area Studies Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Felker, William; Fuller, Clark

    The Foreign Language/Area Studies Enhancement Program at Central State University (Ohio) is an experience-centered work and study program in Africa designed to give students training in language, culture, and technology. It parallels and supports the university's northern Senegal water management project designed to promote self-sufficiency among…

  14. Potential revenue sources for Virginia's transportation safety programs : review of Virginia's revenue sources and a survey of other states : final report.

    DOT National Transportation Integrated Search

    1992-01-01

    Fearful that inflation and the gradual erosion of federal support for highway safety programs were undermining Virginia's historic position of national leadership in highway safety; management directed a study of potential sources of new revenue for ...

  15. Accounting Cluster Demonstration Program at Aloha High School. Final Report.

    ERIC Educational Resources Information Center

    Beaverton School District 48, OR.

    A model high school accounting cluster program was planned, developed, implemented, and evaluated in the Beaverton, Oregon, school district. The curriculum was developed with the help of representatives from the accounting occupations in the Portland metropolitan area. Through management interviews, identification of on-the job requirements, and…

  16. Bridges to Business. Fund for the Improvement of Postsecondary Education Final Report.

    ERIC Educational Resources Information Center

    Ironfield, Elaine

    Bridges to Business is a dual admissions program between Holyoke Community College (HCC) (Massachusetts) and the School of Management at the University of Massachusetts-Amherst (UMass). Established to attract, educate, and graduate linguistic minority students, the FIPSE-funded program addressed the major problems faced by limited English…

  17. A World of Fashion Course for Fashion-Oriented Students. Career Education in Home Economics. Final Report.

    ERIC Educational Resources Information Center

    Pew, Lou Ann

    The document consists of a brief project report, copies of program publicity and related correspondence, and one of the nine learning packets developed for use in the program. The purpose of the project was to develop guidelines for planning, conducting, managing, and evaluating a simulation program for teaching the skills and competencies…

  18. Health Care Financing Administration--Medicaid program; Medicaid management information systems. Final rule.

    PubMed

    1980-03-05

    These regulations set forth a new procedure to improve Medicaid management by explicitly authorizing HCFA to expand or revise State Medicaid Management Information Systems (MMIS) as necessary to meet program needs. Under this procedure, HCFA will publish major new requirements for comment before deciding to adopt them, and will provide increased Federal matching and reasonable phase-in time for their implementation. HCFA will also periodically review ongoing systems to determine whether all system requirements and performance standards are being met and may reduce the level of Federal matching for those MMIS systems which do not meet prescribed standards.

  19. Proceedings of the drug testing laboratory managers symposium, 28 January--1 February 1974. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noe, E.R.; Romanchick, W.A.; Ainsworth, C.A. III

    1975-06-01

    This report deals with broad concepts of managing mass screening programs for drugs of abuse; e.g., morphine, barbiturate, amphetamine, cocaine, and methaqualone. The interactions of the screening process and of the rehabilitation program were covered. Psychotherapy and group therapy are both utilized in rehabilitation programs. The semiautomated radioimmunoassay (RIA) screening procedures are both sensitive and specific at nanogram quantities. Future evaluations of a wafer disk transferral system and of a latex test for morphine are presented. The unique quality control system employed by military drug abuse testing laboratories is discussed. (Author) (GRA)

  20. Infrastructure support for a waste management institute. Final project report, September 12, 1994--September 11, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    North Carolina A and T State University has completed the development of an infrastructure for the interdisciplinary Waste Management Institute (WMI). The Interdisciplinary Waste Management Institute (WMI) was approved in June, 1994 by the General Administration of the University of North Carolina as an academic support unit with research and public service functions. The mission of the WMI is to enhance awareness and understanding of waste management issues and to provide instructional support including research and outreach. The goals of WMI are as follows: increase the number of minority professionals who will work in waste management fields; develop cooperative andmore » exchange programs involving faculty, students, government, and industry; serve as institutional sponsor of public awareness workshops and lecture series; and support interdisciplinary research programs. The vision of the WMI is to provide continued state-of-the art environmental educational programs, research, and outreach.« less

  1. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  2. Medicaid integrity program; limitation on contractor liability. Final rule.

    PubMed

    2007-11-30

    The Medicaid Integrity Program (the Program) provides that the Secretary promote the integrity of the Medicaid program by entering into contracts with contractors that will review the actions of individuals or entities furnishing items or services (whether fee-for-service, risk, or other basis) for which payment may be made under an approved State plan and/or any waiver of the plan approved under section 1115 of the Social Security Act; audit claims for payment of items or services furnished, or administrative services furnished, under a State plan; identify overpayments of individuals or entities receiving Federal funds; and educate providers of services, managed care entities, beneficiaries, and other individuals with respect to payment integrity and quality of care. This final rule will provide for limitations on a contractor's liability while performing these services under the Program. The final rule will, to the extent possible, employ the same or comparable standards and other substantive and procedural provisions as are contained in section 1157 (Limitation on Liability) of the Social Security Act.

  3. 78 FR 33144 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... by SC-227. Final Draft, New Document, Operational and Functional Requirements and Safety Objectives... & Synthetic Vision Systems-- Discussion--Revised Terms of Reference. SC-214--Standards for Air Traffic Data...

  4. Fault management for data systems

    NASA Technical Reports Server (NTRS)

    Boyd, Mark A.; Iverson, David L.; Patterson-Hine, F. Ann

    1993-01-01

    Issues related to automating the process of fault management (fault diagnosis and response) for data management systems are considered. Substantial benefits are to be gained by successful automation of this process, particularly for large, complex systems. The use of graph-based models to develop a computer assisted fault management system is advocated. The general problem is described and the motivation behind choosing graph-based models over other approaches for developing fault diagnosis computer programs is outlined. Some existing work in the area of graph-based fault diagnosis is reviewed, and a new fault management method which was developed from existing methods is offered. Our method is applied to an automatic telescope system intended as a prototype for future lunar telescope programs. Finally, an application of our method to general data management systems is described.

  5. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs. PCEVAL User`s Manual, A computer code for evaluating the economics of nuclear plant protective clothing programs: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs.more » The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User`s Manual, provides detailed instruction on use of the software.« less

  6. Final priority; Technical Assistance on State Data Collection--IDEA Data Management Center. Final priority.

    PubMed

    2014-08-05

    The Assistant Secretary for the Office of Special Education and Rehabilitative Services (OSERS) announces a priority under the Technical Assistance on State Data Collection program. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to fund a cooperative agreement to establish and operate an IDEA Data Management Center (Center) that will provide technical assistance (TA) to improve the capacity of States to meet the data collection requirements of the Individuals with Disabilities Education Act (IDEA).

  7. 76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    .... January 4, 1989, 54 FR 246.... NESHAPS: Final Standards for May 14, 2001, 66 FR 24270..... OAC 3745-50-41...; Checklist 188.1. NESHAPS: Interim Standards for February 13, 2002, 67 FR 6792. OAC 3745-50-44; 3745-50-66... Waste Combustors 2009. (Interim Standards Rule); Checklist 197. NESHAPS: Standards for Hazardous...

  8. Case study and lessons learned for the Great Lakes ITS Program, Airport ITS Integration and the Road Infrastructure Management System projects, final report, Wayne County, Michigan

    DOT National Transportation Integrated Search

    2007-03-02

    This report presents the case study and lessons learned for the national evaluation of the Great Lakes Intelligent Transportation Systems (GLITS) Airport ITS Integration and Road Infrastructure Management System (RIMS) projects. The Airport ITS Integ...

  9. 76 FR 70374 - List of Approved Spent Fuel Storage Casks: MAGNASTOR® System, Revision 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... Trussell, Office of Federal and State Materials and Environmental Management Programs, U.S. Nuclear... Management System (ADAMS): Publicly available documents created or received at the NRC are available online... protection of public health and safety continues to be ensured. The direct final rule will become effective...

  10. 40 CFR 272.2201 - Texas State-Administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...); Chapter 371, Texas Oil Collection, Management, and Recycling Act, sections 371.0025(b) and (c), 371.024(a..., Management, and Recycling Act, sections 371.021, 371.022, 371.024(e), 371.0245, 371.0246, 371.025, and 371...-Containing Batteries and Silver-Containing Batteries (HSWA) (Checklist 201) 67 FR 62618 October 7, 2002...

  11. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - Pasadena testbed analysis plan : final report.

    DOT National Transportation Integrated Search

    2016-06-30

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  12. KSC-2009-2211

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The booster segments for the Ares I-X test rocket were delivered to NASA's Kennedy Space Center in Florida by the Florida East Coast Railroad and the NASA Railroad. Accompanying the train on its route from Jacksonville, Fla., were NASA and ATK officials. Standing here, from left, are ATK Ares I Flight Tests Program Director Joe Oliva, ATK Ares I-X Florida Program Manager Russ Page, NASA Ares Program Manager Steve Cook, ATK Deputy Site Director in Florida Ted Shaffner, NASA KSC Ares I-X Deputy Mission Manager Jon Cowart, ATK Vice President of Space Launch Propulson Cary Ralston, ATK Ares I First Stage program Director Fred Brasfield, ATK Vice President Space Launch Systems Charlie Precourt, ATK Ares I Flight Tests Deputy Program Director Kathy Philpot, NASA Marshall Space Flight Center Reusable Solid Rocket Booster Integration Lead Roy Worthy, ATK Florida Site Director Bob Herman, NASA Res First Stage Project Manager Alex Priskos and NASA KSC Shuttle Launch Director Mike Leinbach. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  13. Early Childhood Reform in Seven Communities: Front-Line Practice, Agency Management, and Public Policy. [Volume I: Final Technical Report.] Studies of Education Reform.

    ERIC Educational Resources Information Center

    Schultz, Tom; And Others

    An era of substantial growth in investment of resources, program development, and research has led to tangible gains in the scope and quality of early childhood education programs. However, the system of early childhood education programs is plagued by unequal access and inconsistent, inadequate levels of quality. Additionally, the focus of…

  14. Case management's value is finally recognized. What happens now? .

    PubMed

    2015-10-01

    In recent years, case management has been recognized as a key in improving healthcare quality and reducing costs, but while hospitals are giving case managers more responsibilities, many administrators are not approving an increase in staff to handle the extra work. Case managers can help their hospital succeed with the Centers for Medicare & Medicaid Services' Value-based Purchasing program, the readmission reduction program, and bundled payments. Case management directors should make sure the hospital's senior leadership understands the roles and responsibilities of case managers and how their interventions can affect outcomes and the bottom line. The number of caseloads depends on the case management model, the responsibilities of case managers, and whether they have assistants or case management extenders who can take over some tasks and allow the licensed staff to work at the top of their licenses. Don't let technology replace communication and patient-centered interactions.

  15. Curriculum Development for the Tourism Option of the Hospitality, Restaurant Management Program. Final Report.

    ERIC Educational Resources Information Center

    Walk, Mary

    A project was undertaken to develop classroom materials for a tourism program that would integrate work experience and classroom instruction. After reviewing available literature, conferring with other educators, and conducting a series of interviews with persons employed in the hospitality industry, the researcher developed a set of instructional…

  16. 78 FR 5035 - Final Priorities; Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... flexibility where possible, and develop and implement a study design that would answer important questions... basic design requirements--for both program management and evaluation purposes--for data and account... commenter stated that based on its experience with schools, local governments, and others in the design and...

  17. 75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...

  18. Evaluation and use of the Materials and Test (MATT) Data System for quality of construction and management review : final report.

    DOT National Transportation Integrated Search

    1985-12-01

    This report documents the review of the MATerials and Test (MATT) Data System to check the validity of data within the system. A computer program to generate the quality level of a construction material was developed. Programs were also developed to ...

  19. A Systems Analysis of the MDTA Institutional Training Program. Final Report.

    ERIC Educational Resources Information Center

    North American Rockwell Information Systems Co., Anaheim, CA.

    An industrial study group was contracted to perform a systems analysis of institutional training conducted under the Manpower Development and Training Act (MDTA) of 1962, as amended, in order to: (1) illuminate management decisions in the areas of program priorities, alternative methods of administration, and allocation of resources, and (2)…

  20. 75 FR 78988 - Post-2014 Resource Pool-Loveland Area Projects, Allocation Procedures and Call for Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), is publishing this... allocation of Federal electric power. Subpart C of the Energy Planning and Management Program (Program... for applications, in conjunction with the Loveland Area Projects (LAP) Final Post-1989 Marketing Plan...

  1. Performance testing of elastomeric seal materials under low and high temperature conditions: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BRONOWSKI,DAVID R.

    The US Department of Energy Offices of Defense Programs and Civilian Radioactive Waste Management jointly sponsored a program to evaluate elastomeric O-ring seal materials for radioactive material shipping containers. The report presents the results of low- and high-temperature tests conducted on 27 common elastomeric compounds.

  2. 77 FR 13200 - Texas: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ....1. Such wastes are termed ``oil and gas wastes.'' The TCEQ has responsibility to administer the RCRA program, however, hazardous waste generated at natural gas or natural gas liquids processing plants or... with the exploration, development, or production of oil or gas or geothermal resources and other...

  3. Texas Nutrition Education and Training Program for Federal Fiscal Year 1996. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Ahmad, Mahassen

    The Texas Nutrition Education and Training Program (NET) provides: (1) workshops to teach children about good eating habits in school and in child care facilities; (2) a circulating NET library collection; (3) instructional and promotional materials on nutrition and food service management; (4) presentations, exhibits, and publications on…

  4. Final Environmental Assessment, Assured Aerospace Fuels Research Facility, Wright-Patterson Air Force Base, Ohio

    DTIC Science & Technology

    2008-09-01

    Fish and Wildlife Services Amir Mott Program Manager 88 ABW/CECW Zachary Olds WPAFB Air and Water Program Technician 88 ABW/CEV Warren Richardson...Building 22 Wright Patterson AFB, OH 45433-5209 Dear Mr. Baker: BOARD OF DIRECTORS William E. Lukens Gayle B. Price, Jr. Thomas B. Rentschler GENERAL

  5. 77 FR 13248 - Texas: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ..., 2012. ADDRESSES: Send written comments to Alima Patterson, Region 6, Regional Authorization Coordinator... Federal Register. FOR FURTHER INFORMATION CONTACT: Alima Patterson (214) 665-8533. SUPPLEMENTARY...

  6. Towards Excellence in Asthma Management: final report of an eight-year program aimed at reducing care gaps in asthma management in Quebec.

    PubMed

    Boulet, Louis-Philippe; Dorval, E; Labrecque, M; Turgeon, M; Montague, T; Thivierge, R L

    2008-09-01

    Asthma care in Canada and around the world persistently falls short of optimal treatment. To optimize care, a systematic approach to identifying such shortfalls or 'care gaps', in which all stakeholders of the health care system (including patients) are involved, was proposed. Several projects of a multipartner, multidisciplinary disease management program, developed to optimize asthma care in Quebec, was conducted in a period of eight years. First, two population maps were produced to identify regional variations in asthma-related morbidity and to prioritize interventions for improving treatment. Second, current care was evaluated in a physician-patient cohort, confirming the many care gaps in asthma management. Third, two series of peer-reviewed outcome studies, targeting high-risk populations and specific asthma care gaps, were conducted. Finally, a process to integrate the best interventions into the health care system and an agenda for further research on optimal asthma management were proposed. Key observations from these studies included the identification of specific patterns of noncompliance in using inhaled corticosteroids, the failure of increased access to spirometry in asthma education centres to increase the number of education referrals, the transient improvement in educational abilities of nurses involved with an asthma hotline telephone service, and the beneficial effects of practice tools aimed at facilitating the assessment of asthma control and treatment needs by general practitioners. Disease management programs such as Towards Excellence in Asthma Management can provide valuable information on optimal strategies for improving treatment of asthma and other chronic diseases by identifying care gaps, improving guidelines implementation and optimizing care.

  7. Office of the Secretary; Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); transitional assistance management program; early eligibility for TRICARE for certain reserve component members. Final rule.

    PubMed

    2006-06-02

    This final rule revises requirements and procedures for the Transitional Assistance Management Program, which was temporarily revised by section 704 of the National Defense Authorization Act for Fiscal Year 2004 (NDAA-04) (Pub. L. 108-136) and section 1117 of the Emergency Supplemental Appropriations Act for the Reconstruction of Iraq and Afghanistan, 2004 (Emergency Supplemental) (Pub. L. 108-106), which revisions were made permanent by section 706(a) of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA-05) (Pub. L. 108-375). In addition, it establishes requirements and procedures for implementation of the earlier TRICARE eligibility for certain reserve component members authorized by section 703 of NDAA-04 and section 1116 of the Emergency Supplemental, which provisions were made permanent by section 703 of NDAA-05. The rule adopts the interim rule published in the Federal Register on March 16, 2005 (70 FR 12798).

  8. Managers' Support for Employee Wellness Programs: An Integrative Review.

    PubMed

    Passey, Deborah G; Brown, Meagan C; Hammerback, Kristen; Harris, Jeffrey R; Hannon, Peggy A

    2018-01-01

    The aim of this integrative literature review is to synthesize the existing evidence regarding managers' support for employee wellness programs. The search utilized multiple electronic databases and libraries. Inclusion criteria comprised peer-reviewed research published in English, between 1990 and 2016, and examining managers' support in the context of a worksite intervention. The final sample included 21 articles for analysis. Two researchers extracted and described results from each of the included articles using a content analysis. Two researchers independently rated the quality of the included articles. Researchers synthesized data into a summary table by study design, sample, data collected, key findings, and quality rating. Factors that may influence managers' support include their organization's management structure, senior leadership support, their expected roles, training on health topics, and their beliefs and attitudes toward wellness programs and employee health. Managers' support may influence the organizational culture, employees' perception of support, and employees' behaviors. When designing interventions, health promotion practitioners and researchers should consider strategies that target senior, middle, and line managers' support. Interventions need to include explicit measures of managers' support as part of the evaluation plan.

  9. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  10. 40 CFR 272.751 - Indiana state-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Metal Wastes and Mineral Processing Wastes (Checklist 167A), Hazardous Soils Treatment Standards and...)), 270.1, 270.14(a), and 270.28 are non-HSWA provisions. Hazardous Remediation Waste Management...

  11. 78 FR 32223 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ..., 2013. ADDRESSES: Send written comments to Alima Patterson, Region 6, Regional Authorization Coordinator... the Rules section of this Federal Register. FOR FURTHER INFORMATION CONTACT: Alima Patterson (214) 665...

  12. 77 FR 38566 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-28

    ... comments by July 30, 2012. ADDRESSES: Send written comments to Alima Patterson, Region 6, Regional... CONTACT: Alima Patterson (214) 665-8533. SUPPLEMENTARY INFORMATION: For additional information, please see...

  13. 77 FR 15343 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    ... written comments by April 16, 2012. ADDRESSES: Send written comments to Alima Patterson, Region 6... Patterson (214) 665-8533. SUPPLEMENTARY INFORMATION: For additional information, please see the immediate...

  14. Apollo experience report: Very high frequency ranging system

    NASA Technical Reports Server (NTRS)

    Panter, W. C.; Shores, P. W.

    1972-01-01

    The history of the Apollo very-high-frequency ranging system development program is presented from the program-planning stage through the final-test and flight-evaluation stages. Block diagrams of the equipment are presented, and a description of the theory of operation is outlined. A sample of the distribution of errors measured in the aircraft-flight test program is included. The report is concluded with guidelines or recommendations for the management of development programs having the same general constraints.

  15. Development of a standardized job description for healthcare managers of metabolic syndrome management programs in Korean community health centers.

    PubMed

    Lee, Youngjin; Choo, Jina; Cho, Jeonghyun; Kim, So-Nam; Lee, Hye-Eun; Yoon, Seok-Jun; Seomun, GyeongAe

    2014-03-01

    This study aimed to develop a job description for healthcare managers of metabolic syndrome management programs using task analysis. Exploratory research was performed by using the Developing a Curriculum method, the Intervention Wheel model, and focus group discussions. Subsequently, we conducted a survey of 215 healthcare workers from 25 community health centers to verify that the job description we created was accurate. We defined the role of healthcare managers. Next, we elucidated the tasks of healthcare managers and performed needs analysis to examine the frequency, importance, and difficulty of each of their duties. Finally, we verified that our job description was accurate. Based on the 8 duties, 30 tasks, and 44 task elements assigned to healthcare managers, we found that the healthcare managers functioned both as team coordinators responsible for providing multidisciplinary health services and nurse specialists providing health promotion services. In terms of importance and difficulty of tasks performed by the healthcare managers, which were measured using a determinant coefficient, the highest-ranked task was planning social marketing (15.4), while the lowest-ranked task was managing human resources (9.9). A job description for healthcare managers may provide basic data essential for the development of a job training program for healthcare managers working in community health promotion programs. Copyright © 2014. Published by Elsevier B.V.

  16. 76 FR 50918 - Final Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...Base (1% annual-chance) Flood Elevations (BFEs) and modified BFEs are made final for the communities listed below. The BFEs and modified BFEs are the basis for the floodplain management measures that each community is required either to adopt or to show evidence of being already in effect in order to qualify or remain qualified for participation in the National Flood Insurance Program (NFIP).

  17. DoD Consumer Affairs Program

    DTIC Science & Technology

    1982-08-12

    Suggestion boxes. 11 Customer "Want" slips. (c) Communications to Consumers on Issues and Decisions. Consumers are informed of issues and pending final...of Federal Consumer Programs," September 26, 1979 (c) DoD Directive 5000. 19, "Policies for the Management and Control of Intotmation Requirements...b) to update responsibilities and guidelines for the DoD Consumer Affairs Program. B. APPLICABILITY This Directive applies to the Office of the

  18. Low-Cost, Net-Shape Ceramic Radial Turbine Program

    DTIC Science & Technology

    1985-05-01

    PROGRAM ELEMENT. PROJECT. TASK Garrett Turbine Engine Company AE OKUI UBR 111 South 34th Street, P.O. Box 2517 Phoenix, Arizona 85010 %I. CONTROLLING...processing iterations. Program management and materials characterization were conducted at Garrett Turbine Engine Company (GTEC), test bar and rotor...automotive gas turbine engine rotor development efforts at ACC. xvii PREFACE This is the final technical report of the Low-Cost, Net- Shape Ceramic

  19. Medicare Program: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Organ Procurement Organization Reporting and Communication; Transplant Outcome Measures and Documentation Requirements; Electronic Health Record (EHR) Incentive Programs; Payment to Nonexcepted Off-Campus Provider-Based Department of a Hospital; Hospital Value-Based Purchasing (VBP) Program; Establishment of Payment Rates Under the Medicare Physician Fee Schedule for Nonexcepted Items and Services Furnished by an Off-Campus Provider-Based Department of a Hospital. Final rule with comment period and interim final rule with comment period.

    PubMed

    2016-11-14

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2017 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program and the ASC Quality Reporting (ASCQR) Program. Further, in this final rule with comment period, we are making changes to tolerance thresholds for clinical outcomes for solid organ transplant programs; to Organ Procurement Organizations (OPOs) definitions, outcome measures, and organ transport documentation; and to the Medicare and Medicaid Electronic Health Record Incentive Programs. We also are removing the HCAHPS Pain Management dimension from the Hospital Value-Based Purchasing (VBP) Program. In addition, we are implementing section 603 of the Bipartisan Budget Act of 2015 relating to payment for certain items and services furnished by certain off-campus provider-based departments of a provider. In this document, we also are issuing an interim final rule with comment period to establish the Medicare Physician Fee Schedule payment rates for the nonexcepted items and services billed by a nonexcepted off-campus provider-based department of a hospital in accordance with the provisions of section 603.

  20. Lessons Learned from the Mothers' Overweight Management Study in 4 West Virginia WIC Offices

    ERIC Educational Resources Information Center

    Krummel, Debra; Semmens, Elizabeth; MacBride, Anne M.; Fisher, Brenda

    2010-01-01

    A pilot was conducted to test the feasibility and compare the effectiveness of a group approach (facilitated group discussions) to that of a self-guided approach (newsletters) to weight management in postpartum women enrolled in the Special Supplemental Nutrition Program for Women, Infants, and Children (baseline n = 151; final n = 64). Mean group…

  1. Overview of the Parent Child Center Management Information System. Final Report.

    ERIC Educational Resources Information Center

    Abt Associates, Inc., Cambridge, MA.

    The Parent Child Center Management Information System, the first operational MIS for a social action program relating to child welfare, consists of three interlocking components: a standard set of recordkeeping forms for the local Parent Child Center; a set of quarterly reporting forms that interface with the recordkeeping forms; and a series of…

  2. 78 FR 63408 - List of Approved Spent Fuel Storage Casks: Transnuclear, Inc. Standardized NUHOMS® Cask System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ...: Gregory R. Trussell, Office of Federal and State Materials and Environmental Management Programs, U.S... Access and Management System (ADAMS): You may access publicly-available documents online in the NRC... continues to be ensured. The direct final rule will become effective on January 7, 2014. However, if the NRC...

  3. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - calibration report for Dallas testbed : final report.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  4. Develop a Comprehensive Technical Training and Data Collection Program for Structural Welders and Fitters: Technical Proposal

    DTIC Science & Technology

    2006-05-30

    implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails

  5. Review Sessions and Results: Competency Testing in the Capstone Business Class

    ERIC Educational Resources Information Center

    Parente, Diane H.; Brown, Randy C.; Warner, Alfred G.

    2005-01-01

    Capstone is defined in the dictionary as "putting the final stone in place." Business Policy or Strategic Management is typically the capstone class in a business management degree program. As such, there are prerequisite requirements in terms of courses and specific knowledge. We have implemented a competency test for the capstone class and…

  6. 78 FR 25487 - Final License Renewal Interim Staff Guidance LR-ISG-2012-01: Wall Thinning Due to Erosion Mechanisms

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ....'' This LR-ISG revises an NRC staff-recommended aging management program (AMP) in NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging management review procedure and... for piping and components within the scope of the Requirements for Renewal of Operating Licenses for...

  7. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - calibration Report for Phoenix Testbed : Final Report.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  8. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - San Mateo Testbed Analysis Plan : Final Report.

    DOT National Transportation Integrated Search

    2016-06-29

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  9. The NASA Scientific and Technical Information Program: Exploring challenges, creating opportunities

    NASA Technical Reports Server (NTRS)

    Sepic, Ronald P.

    1993-01-01

    The NASA Scientific and Technical Information (STI) Program offers researchers access to the world's largest collection of aerospace information. An overview of Program activities, products and services, and new directions is presented. The R&D information cycle is outlined and specific examples of the NASA STI Program in practice are given. Domestic and international operations and technology transfer activities are reviewed and an agenda for the STI Program NASA-wide is presented. Finally, the incorporation of Total Quality Management and evaluation metrics into the STI Program is discussed.

  10. Core I Materials for Metropolitan Agriculture/Horticulture Programs. Units G-J.

    ERIC Educational Resources Information Center

    Ethridge, Jim; And Others

    These units of instructional materials and teaching aids are the final four of a series of 10 designed for use in metropolitan agriculture/horticulture programs for students in grades 9 and 10. Covered in the unit on growing and managing horticultural crops are watering plants; pruning, pinching, and planting plants; using plant production…

  11. Stormwater Management in Response to Climate Change Impacts: Lessons from the Chesapeake Bay and Great Lakes Regions (Final Report)

    EPA Science Inventory

    This report was prepared by the U.S. Environmental Protection Agency’s (EPA) Air, Climate, and Energy (ACE) research program, located within the Office of Research and Development, with support from ICF International. One of the goals of the ACE research program is to provide sci...

  12. Establish Best Practices for Supervision of Instructors

    DTIC Science & Technology

    2012-09-01

    633. Christen, W. L., & Murphy, T. J. (1987). Inservice training and peer evaluation: An integrated program for faculty development. NASSP...describes the current state of instructional supervision in Special Operations Forces (SOF) initial acquisition training (IAT) language schools. This...leadership and Command Language Program Managers (CLPMs) related to selection, training , and resourcing. Finally, specific recommendations are provided for

  13. Preservation at Stony Brook. Preservation Planning Program. Study Report.

    ERIC Educational Resources Information Center

    Cook, Donald C.; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  14. Human Space Flight Plans Committee

    NASA Image and Video Library

    2009-08-11

    Bohdan Bejmuk, chair, Constellation program Standing Review Board, and former manager of the Boeing Space Shuttle and Sea Launch programs, right, asks a question during the final meeting of the Human Space Flight Review Committee as Dr. Wanda Austin, president and CEO, The Aerospace Corp., looks on at left, Wednesday, Aug. 12, 2009, in Washington. Photo Credit: (NASA/Paul E. Alers)

  15. Supplemental Driver Safety Program Development. Volume I--Development Research and Evaluation. Final Report.

    ERIC Educational Resources Information Center

    McPherson, Kenard; And Others

    Instructional modules for driver education programs were prepared to improve safe driving knowledge, attitudes, and performances of 16- to 18-year-old drivers. These modules were designed to provide supplementary instruction in five content areas critical to the safe and efficient operation of motor vehicles by young drivers--speed management,…

  16. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  17. DOCUMENTATION FOR THE GRIDDED HOURLY ATRAZINE EMISSIONS DATA SET FOR THE LAKE MICHIGAN MASS BALANCE STUDY: A FINAL CONTRACT REPORT

    EPA Science Inventory

    In order to develop effective strategies for toxics management, the Great Lakes National Program Office (GLNPO) of the United States Environmental Protection Agency (U.S. EPA), in 1994, launched an ambitious five year program to conduct a mass balance study of selected toxics p...

  18. 75 FR 62919 - Notice of Final Federal Agency Actions on Proposed Highway in Vermont

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... INFORMATION CONTACT: For FHWA: Mr. Kenneth R. Sikora, Jr., Environmental Program Manager, Federal Highway Administration, P.O. Box 568, Montpelier, Vermont 05601-0568; telephone: (802) 828-4573; e-mail: Kenneth.Sikora....) Authority: 23 U.S.C. 139(l)(1). Issued on: October 6, 2010. Kenneth R. Sikora, Jr., Environmental Program...

  19. Effect of strategic planning education on attitudes and perceptions of independent community pharmacy owners/managers.

    PubMed

    Harrison, Donald L

    2007-01-01

    To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.

  20. FDOT transportation research peer exchange : final report.

    DOT National Transportation Integrated Search

    2013-02-01

    Each of FDOTs peer exchanges has been substantially different in composition and theme. The first focused on overall research program management; the second on opportunities for enhancing the Research Centers relationships with FDOT project man...

  1. 78 FR 79615 - Vermont: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ...); OECD Requirements; Export Shipments of Spent Lead-Acid Batteries [75 FR 1236, January 8, 2010... top crushing is regulated as treatment rather than being considered an exempt recycling activity (this...

  2. 78 FR 45459 - Extension of Sunset Date for Attorney Advisor Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ... conduct certain prehearing procedures and issue decisions that are fully favorable when the documentary... the Office of Management and Budget (OMB) and determined that this final rule does not meet the...

  3. 75 FR 65442 - New Mexico: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... comments by November 24, 2010. ADDRESSES: Send written comments to Alima Patterson, Region 6, Regional... CONTACT: Alima Patterson (214) 665-8533. SUPPLEMENTARY INFORMATION: For additional information, please see...

  4. 76 FR 19004 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... written comments by May 6, 2011. ADDRESSES: Send written comments to Alima Patterson, Region 6, Regional... Patterson (214) 665-8533. SUPPLEMENTARY INFORMATION: For additional information, please see the immediate...

  5. Pharmaceutical company sponsored disease management programs: an alternative for tax-exempt MCOs and hospitals.

    PubMed

    Jedrey, Christopher M; Chaurette, Katherine A; Winn, Lara Beth

    2002-01-01

    On April 25, 2002, the Internal Revenue Service finalized the proposed Corporate Sponsorship regulations. The changes made in the final regulations pertain to the proposed $79 ceiling on disregarded benefits, the 2 percent threshold for disregarded benefits, the scope of disregarded benefits, Web site hyperlinks, the inclusion of certain electronic publications in the definition of periodicals, the valuation date for substantial return benefits, and the scope of use or acknowledgement. The proposed regulations were discussed in the Winter 2002 issue of Managed Care Quarterly in an article titled the same as this one. This article is based on the final IRS regulations and therefore supersedes the original article published in the Winter 2002 issue.

  6. Tiger Team Assessment of the Pantex Plant, Amarillo, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-02-01

    This document contains the findings and associated root causes identified during the Tiger Team Assessment of the Department of Energy's (DOE) Pantex Plant in Amarillo, Texas. This assessment was conducted by the Department's Office of Environment, Safety and Health between October 2 and 31, 1989. The scope of the assessment of the Pantex Plant covered all areas of environment, safety and health (ES H) activities, including compliance with federal, state, and local regulations, requirements, permits, agreements, orders and consent decrees, and DOE ES H Orders. The assessment also included an evaluation of the adequacy of DOE and site contractor ESmore » H management programs. The draft findings were submitted to the Office of Defense Programs, the Albuquerque Operations Office, the Amarillo Area Office, and regulatory agencies at the conclusion of the on-site assessment activities for review and comment on technical accuracy. Final modifications and any other appropriate changes have been incorporated in the final report. The Tiger Team Assessment of the Pantex Plant is part of the larger Tiger Team Assessment program which will encompass over 100 DOE operating facilities. The assessment program is part of a 10-point initiative announced by Secretary of Energy James D. Watkins on June 27, 1989, to strengthen environmental protection and waste management activities in the Department. The results of the program will provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and site contractor ES H management programs, and DOE-wide ES H compliance trends.« less

  7. ERISTAR: Earth Resources Information Storage, Transformation, Analysis, and Retrieval administrative report

    NASA Technical Reports Server (NTRS)

    Vachon, R. I.; Obrien, J. F., Jr.; Lueg, R. E.; Cox, J. E.

    1972-01-01

    The 1972 Systems Engineering program at Marshall Space Flight Center where 15 participants representing 15 U.S. universities, 1 NASA/MSFC employee, and another specially assigned faculty member, participated in an 11-week program is discussed. The Fellows became acquainted with the philosophy of systems engineering, and as a training exercise, used this approach to produce a conceptional design for an Earth Resources Information Storage, Transformation, Analysis, and Retrieval System. The program was conducted in three phases; approximately 3 weeks were devoted to seminars, tours, and other presentations to subject the participants to technical and other aspects of the information management problem. The second phase, 5 weeks in length, consisted of evaluating alternative solutions to problems, effecting initial trade-offs and performing preliminary design studies and analyses. The last 3 weeks were occupied with final trade-off sessions, final design analyses and preparation of a final report and oral presentation.

  8. Final Environmental Assessment: Implementation of the Natural Resources Management Program Clear Air Force Station, Alaska

    DTIC Science & Technology

    2003-06-01

    the management intensity level that would allow for the effective ecosystem management of Clear AFS lands, (2) continue with mission support for...Implementation of Al ternative A would not effect outdoor recreation at Clear AFS. Minimal changes to outdoor recreation would occur under Allemative B...environmental effects of the Proposed Action and Alternatives analyzed are not significant and the preparation of an EIS is not warranted

  9. Water Resources Research Grant Program Project Descriptions: Fiscal Year 1988

    USGS Publications Warehouse

    Lew, Melvin; McCoy, Beverly M.

    1989-01-01

    This report contains information on the 38 new projects funded by the U.S. Geological Survey's Water Resources Research Grant Program in fiscal year 1988 and on 11 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), project duration, and a project description that includes: (1) identification of water-related problems and problem-solution approach, (2) contribution to problem solution, (3) objectives, and (4) approach. The 38 projects include 14 in the area of ground-water quality problems, 10 in the science and technology of water-quality management, 4 in climate variability and the hydrologic cycle, 7 in institutional change in water-resources management, and 3 in miscellaneous water-resources management problems. For the 11 completed projects, the report gives the grant number, project title, performing organization, principal investigator(s), starting date, date of receipt of final report, and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report also contains tables showing (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization.

  10. Water Resources Research Grant Program project descriptions, fiscal year 1987

    USGS Publications Warehouse

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  11. New challenges for grizzly bear management in Yellowstone National Park

    USGS Publications Warehouse

    van Manen, Frank T.; Gunther, Kerry A.

    2016-01-01

    A key factor contributing to the success of grizzly bear Ursus arctos conservation in the Greater Yellowstone Ecosystem has been the existence of a large protected area, Yellowstone National Park. We provide an overview of recovery efforts, how demographic parameters changed as the population increased, and how the bear management program in Yellowstone National Park has evolved to address new management challenges over time. Finally, using the management experiences in Yellowstone National Park, we present comparisons and perspectives regarding brown bear management in Shiretoko National Park.

  12. Towards Excellence in Asthma Management: Final report of an eight-year program aimed at reducing care gaps in asthma management in Quebec

    PubMed Central

    Boulet, Louis-Philippe; Dorval, Eileen; Labrecque, Manon; Turgeon, Michel; Montague, Terrence; Thivierge, Robert L

    2008-01-01

    BACKGROUND AND OBJECTIVES: Asthma care in Canada and around the world persistently falls short of optimal treatment. To optimize care, a systematic approach to identifying such shortfalls or ‘care gaps’, in which all stakeholders of the health care system (including patients) are involved, was proposed. METHODS: Several projects of a multipartner, multidisciplinary disease management program, developed to optimize asthma care in Quebec, was conducted in a period of eight years. First, two population maps were produced to identify regional variations in asthma-related morbidity and to prioritize interventions for improving treatment. Second, current care was evaluated in a physician-patient cohort, confirming the many care gaps in asthma management. Third, two series of peer-reviewed outcome studies, targeting high-risk populations and specific asthma care gaps, were conducted. Finally, a process to integrate the best interventions into the health care system and an agenda for further research on optimal asthma management were proposed. RESULTS: Key observations from these studies included the identification of specific patterns of noncompliance in using inhaled corticosteroids, the failure of increased access to spirometry in asthma education centres to increase the number of education referrals, the transient improvement in educational abilities of nurses involved with an asthma hotline telephone service, and the beneficial effects of practice tools aimed at facilitating the assessment of asthma control and treatment needs by general practitioners. CONCLUSIONS: Disease management programs such as Towards Excellence in Asthma Management can provide valuable information on optimal strategies for improving treatment of asthma and other chronic diseases by identifying care gaps, improving guidelines implementation and optimizing care. PMID:18818784

  13. 75 FR 18261 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ...This final rule implements measures approved under Amendment 16 to the NE Multispecies Fishery Management Plan (FMP). Amendment 16 was developed by the New England Fishery Management Council (Council) as part of the biennial adjustment process in the FMP to update status determination criteria for all regulated NE multispecies or ocean pout stocks; to adopt rebuilding programs for NE multispecies stocks newly classified as being overfished and subject to overfishing; and to revise management measures, including significant revisions to the sector management measures, necessary to end overfishing, rebuild overfished regulated NE multispecies and ocean pout stocks, and mitigate the adverse economic impacts of increased effort controls. This final rule also implements new requirements under Amendment 16 for establishing acceptable biological catch (ABC), annual catch limits (ACLs), and accountability measures (AMs) for each stock managed under the FMP, pursuant to the Magnuson-Stevens Fishery Conservation and Management Act (Magnuson-Stevens Act). Finally, this action adds Atlantic wolffish to the list of species managed by the FMP. This action is necessary to address the results of the most recent stock assessment, which indicate that several additional regulated species are overfished and subject to overfishing, and that stocks currently classified as overfished require additional reductions in fishing mortality to rebuild by the end of their rebuilding periods.

  14. TRICARE; TRICARE sanction authority for third-party billing agents. Final rule.

    PubMed

    2013-02-26

    This final rule will provide the Director, TRICARE Management Activity (TMA), or designee, with the authority to sanction third-party billing agents by invoking the administrative remedy of exclusion or suspension from the TRICARE program. Such sanctions may be invoked in situations involving fraud or abuse on the part of third-party billing agents that prepare or submit claims presented to TRICARE for payment.

  15. 40 CFR 272.2201 - Texas State-Administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...); Chapter 371, Texas Oil Collection, Management, and Recycling Act, sections 371.0025(b) and (c), 371.024(a...) (except the text “§ 39.3 of this title (relating to Purpose) * * * § 55.21 of this title (relating to..., Management, and Recycling Act, sections 371.021, 371.022, 371.024(e), 371.0245, 371.0246, 371.025, and 371...

  16. 75 FR 59787 - Notice of Final Federal Agency Actions on Proposed Highway in New Hampshire

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... CONTACT: For FHWA: Mr. Jamison S. Sikora, Environmental Programs Manager, Federal Highway Administration...-mail: Jamie.Sikora@.dot.gov. For NHDOT: William J. Cass, P.E., Director of Project Development, NH...

  17. Final environmental impact statement. Waste Isolation Pilot Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    This volume contains the appendices for the Final Environmental Impact Statement for the Waste Isolation Pilot Plant (WIPP). Alternative geologic environs are considered. Salt, crystalline rock, argillaceous rock, and tuff are discussed. Studies on alternate geologic regions for the siting of WIPP are reviewed. President Carter's message to Congress on the management of radioactive wastes and the findings and recommendations of the interagency review group on nuclear waste management are included. Selection criteria for the WIPP site including geologic, hydrologic, tectonic, physicochemical compatability, and socio-economic factors are presented. A description of the waste types and the waste processing procedures aremore » given. Methods used to calculate radiation doses from radionuclide releases during operation are presented. A complete description of the Los Medanos site, including archaeological and historic aspects is included. Environmental monitoring programs and long-term safety analysis program are described. (DMC)« less

  18. Identify Skills and Proficiency Levels Necessary for Entry-Level Employment for All Vocational Programs Using Computers to Process Data. Final Report.

    ERIC Educational Resources Information Center

    Crowe, Jacquelyn

    This study investigated computer and word processing operator skills necessary for employment in today's high technology office. The study was comprised of seven major phases: (1) identification of existing community college computer operator programs in the state of Washington; (2) attendance at an information management seminar; (3) production…

  19. Pennsylvania Occupational Competency Assessment Program--1983. Final Report. Vocational-Technical Education Research Report, Volume 22, Number 2. Occupational Competency Evaluation Monograph, Number 15.

    ERIC Educational Resources Information Center

    Walter, Richard A.

    The Pennsylvania State University served as the Pennsylvania Coordinator of Occupational Competency Assessment (OCA). It managed the Pennsylvania OCA Program, which provides the secondary public schools of the state with competent vocational instructors as a component of teacher preparation at Temple University, Indiana University of Pennsylvania,…

  20. From the traditional concept of safety management to safety integrated with quality.

    PubMed

    García Herrero, Susana; Mariscal Saldaña, Miguel Angel; Manzanedo del Campo, Miguel Angel; Ritzel, Dale O

    2002-01-01

    This editorial reviews the evolution of the concepts of safety and quality that have been used in the traditional workplace. The traditional programs of safety are explored showing strengths and weaknesses. The concept of quality management is also viewed. Safety management and quality management principles, stages, and measurement are highlighted. The concepts of quality and safety guarantee are assessed. Total Quality Management concepts are reviewed and applied to safety quality. Total safety management principles are discussed. Finally, an analysis of the relationship between quality and safety from data collected from a company in Spain is presented.

  1. KSC-2013-3517

    NASA Image and Video Library

    2013-09-09

    CAPE CANAVERAL, Fla. -- At the Kennedy Space Center Visitor Complex in Florida, officials pose at the site where a Shuttle Program time capsule has been secured vault within the walls of the Space Shuttle Atlantis home at the Kennedy Space Center Visitor Complex. From the left are: Pete Nickolenko, deputy director of NASA Ground Processing at Kennedy, Patty Stratton of Abacus Technology, currently program manager for the Information Management Communications Support Contract. During the Shuttle Program she was deputy director of Ground Operations for NASA's Space Program Operations Contractor, United Space Alliance, Rita Wilcoxon, NASA's now retired director of Shuttle Processing, Bob Cabana, director of the Kennedy Space Center and George Jacobs, deputy director of Center Operations, who was manager of the agency's Shuttle Transition and Retirement Project Office. The time capsule, containing artifacts and other memorabilia associated with the history of the program is designated to be opened on the 50th anniversary of the shuttle's final landing, STS-135. The new $100 million "Space Shuttle Atlantis" facility includes interactive exhibits that tell the story of the 30-year Space Shuttle Program and highlight the future of space exploration. Photo credit: NASA/Jim Grossmann

  2. Aging Management Guideline for commercial nuclear power plants: Motor control centers; Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toman, G.; Gazdzinski, R.; O`Hearn, E.

    1994-02-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) commercial nuclear power plant motor control centers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specificmore » aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.« less

  3. Final voluntary release assessment/corrective action report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-11-12

    The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resourcemore » Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.« less

  4. Medicare Program: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Short Inpatient Hospital Stays; Transition for Certain Medicare-Dependent, Small Rural Hospitals Under the Hospital Inpatient Prospective Payment System; Provider Administrative Appeals and Judicial Review. Final rule with comment period; final rule.

    PubMed

    2015-11-13

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2016 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program and the ASC Quality Reporting (ASCQR) Program. Further, this document includes certain finalized policies relating to the hospital inpatient prospective payment system: Changes to the 2-midnight rule under the short inpatient hospital stay policy; and a payment transition for hospitals that lost their status as a Medicare-dependent, small rural hospital (MDH) because they are no longer in a rural area due to the implementation of the new Office of Management and Budget delineations in FY 2015 and have not reclassified from urban to rural before January 1, 2016. In addition, this document contains a final rule that finalizes certain 2015 proposals, and addresses public comments received, relating to the changes in the Medicare regulations governing provider administrative appeals and judicial review relating to appropriate claims in provider cost reports.

  5. Financial management challenges for general hospital psychiatry 2001.

    PubMed

    Goldberg, R J

    2001-01-01

    Psychiatry programs are facing significant business and financial challenges. This paper provides an overview of these management challenges in five areas: departmental, hospital, payment system, general finance, and policy. Psychiatric leaders will require skills in a variety of business management areas to ensure their program success. Many programs will need to develop new compensation models with more of an emphasis on revenue collection and overhead management. Programs which cannot master these areas are likely to go out of business. For academic programs, incentive systems must address not only clinical productivity, but academic and teaching output as well. General hospital programs will need to develop increased sophistication in differential cost accounting in order to be able to advocate for their patients and program in the current management climate. Clinical leaders will need the skills (ranging from actuarial to negotiations) to be at the table with contract development, since those decisions are inseparable from clinical care issues. Strategic planning needs to consider the value of improving integration with primary care, along with the ability to understand the advantages and disadvantages of risk-sharing models. Psychiatry leaders need to define and develop useful reports shared with clinical division leadership to track progress and identify problems and opportunities. Leaders should be responsible for a strategy for developing appropriate information system architecture and infrastructure. Finally, it is hoped that some leaders will emerge who can further our needs to address inequities in mental health fee schedules and parity issues which affect our program viability.

  6. Specifics of MS training in the area of nuclear materials safe management for new-comers in nuclear power

    NASA Astrophysics Data System (ADS)

    Geraskin, N. I.; Glebov, V. B.

    2017-01-01

    The issues of specialists training in the field of nuclear materials safe management for the countries, who have taken a way of nuclear power development are analyzed. Arguments in justification of a need of these specialists training for the new-comers are adduced. The general characteristic of the reference MS program “Nuclear materials safe management” is considered. The peculiar features of the program, which is important for graduates from the new-comers have been analyzed. The best practices got as a result of implementation of the program in recent years for the students from Kazakhstan, Belarus, Azerbaijan, Tajikistan, Iran, Turkey and other countries are presented. Finally, the directions of international cooperation in further improvement and development of the program are considered.

  7. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...

  8. 48 CFR 2.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...

  9. 78 FR 35837 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... the docket are listed in the www.regulations.gov index. Although listed in the index, some information... Natural Resources, 217 West Jones Street, Raleigh, North Carolina 27603; telephone number (919) 707-8219...

  10. Research & development, Alabama Department of Transportation : 2005 peer exchange : final report.

    DOT National Transportation Integrated Search

    2005-01-01

    This report documents a 2005 Peer Exchange of the Research & Development Bureau of the Alabama Department of : Transportation (ALDOT). It was conducted with the participation of DOT research program managers from Georgia, : Mississippi, North Carolin...

  11. Road Weather Management Program : connected vehicle-infrastructure research. Final Report

    DOT National Transportation Integrated Search

    2016-04-30

    This report provides insight into how existing vehicle sensor data (e.g., location, heading, road surface and atmospheric conditions) can be utilized by the CVI environment to support transportation safety through road-weather applications. Of specia...

  12. 29 CFR 1952.154 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... determined that in operation the State of North Carolina's occupational safety and health program is at least...-State Integrated Management Information System, the Assistant Secretary evaluated actual operations...

  13. 78 FR 72572 - Operational Contract Support

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ... 0790-AI48 Operational Contract Support AGENCY: Department of Defense (DoD). ACTION: Final rule. SUMMARY: This rule establishes policy, assigns responsibilities, and provides procedures for operational contract support (OCS), including OCS program management, contract support integration, and integration of...

  14. Pacific Armies Management Seminar IV, Held at Honolulu, Hawaii, on 3-7 November 1980. Addendum to Final Report.

    DTIC Science & Technology

    1980-11-07

    qualifications, stepped in to fill the shoes of mentors for the less privileged and this program was later institutionalized as the Army literacy ...program was later institutionalized as the Army literacy patrol program. Conclusion The acceptance of a "protracted struggle" and the commitment of the...other administrative officials can all provide informacion about known or suspected insurgents, organizations, and plans. The intelligence officer does

  15. Medicaid program; Medicaid Management Information Systems; conditions of approval and reapproval and procedures for reduction of Federal financial participation--HCFA. Final rule.

    PubMed

    1985-07-30

    This final rule provides the additional requirements to the conditions and procedures for initial approval and reapproval of Medicaid Management Information Systems (MMIS) that were added by section 1903(r) of the Social Security Act (as amended by section 901 of the Mental Health Systems Act of 1980, Pub. L. 96-398). These provisions are intended to improve States' MMIS, ensure efficient system operations, and make the procedures for detection of fraud, waste, and abuse more effective. In addition, this final rule specifies the procedures we follow in reducing the level of Federal financial participation in State administrative expenditures if a State fails to meet the conditions for initial operation, initial approval, or reapproval of an MMIS.

  16. Medicaid Program; Mechanized Claims Processing and Information Retrieval Systems (90/10). Final rule.

    PubMed

    2015-12-04

    This final rule will extend enhanced funding for Medicaid eligibility systems as part of a state's mechanized claims processing system, and will update conditions and standards for such systems, including adding to and updating current Medicaid Management Information Systems (MMIS) conditions and standards. These changes will allow states to improve customer service and support the dynamic nature of Medicaid eligibility, enrollment, and delivery systems.

  17. Project PEGS! Practices in Effective Guidance Strategies: Interactive CD-ROM Series for Educators To Practice Positive Behavior Management Skills, October 1, 1999-December 30, 2002. Final Performance Report.

    ERIC Educational Resources Information Center

    Quirk, Constance A.

    This final report describes the activities and outcomes of a federally funded project designed to produce and field-test two computer-based interactive CD-ROMs: "PEGS! for Preschool" and "PEGS! for Secondary School". These programs, in a game format, provide beginning general and special educators with independent practice in…

  18. Energy Smart Colorado, Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gitchell, John M.; Palmer, Adam L.

    2014-03-31

    Energy Smart Colorado is an energy efficiency program established in 2011 in the central mountain region of Colorado. The program was funded through a grant of $4.9 million, awarded in August 2010 by the U.S. Department of Energy’s Better Buildings Program. As primary grant recipient, Eagle County coordinated program activities, managed the budget, and reported results. Eagle County staff worked closely with local community education and outreach partner Eagle Valley Alliance for Sustainability (now Walking Mountains Science Center) to engage residents in the program. Sub-recipients Pitkin County and Gunnison County assigned local implementation of the program in their regions tomore » their respective community efficiency organizations, Community Office for Resource Efficiency (CORE) in Pitkin County, and Office for Resource Efficiency (ORE) in Gunnison County. Utility partners contributed $166,600 to support Home Energy Assessments for their customers. Program staff opened Energy Resource Centers, engaged a network of qualified contractors, developed a work-flow, an enrollment website, a loan program, and a data management system to track results.« less

  19. Test Area C-74 Complex Final Range Environmental Assessment at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2015-08-21

    LAWS, REGULATIONS, AND POLICIES ACRONYMS AND ABBREVIATIONS ACHP Advisory Council on Historic Preservation ACM asbestos -containing materials...agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This plan establishes procedures for the Eglin AFB...facility asbestos management program. It contains the policies and procedures used in controlling the health hazards created by asbestos containing

  20. Revising the Depreciation and Investment Credit Lessons for Farm Management and Supervised Occupational Experience for Use in Missouri Programs of Vocational Agriculture. Final Report.

    ERIC Educational Resources Information Center

    Rohrbach, Norman; And Others

    This project developed four lessons that reflect the 1981 tax laws as they relate to the use of investment credit and depreciation in farm accounting systems. Project staff reviewed tax laws and related materials and identified four lessons in farm management and supervised occupational experience that needed revision. Materials were then…

  1. Effective Management of Ocean Biogeochemistry and Ecological Data: the BCO-DMO Story

    NASA Astrophysics Data System (ADS)

    Chandler, C. L.; Groman, R. C.; Allison, M. D.; Wiebe, P. H.; Glover, D. M.; Gegg, S. R.

    2012-04-01

    Data availability expectations of the research community, environmental management decision makers, and funding agency representatives are changing. Consequently, data management practices in many science communities are changing as well. In an effort to improve access to data generated by ocean biogeochemistry and ecological researchers funded by the United States (US) National Science Foundation (NSF) Division of Ocean Sciences (OCE), the Biological and Chemical Oceanography Data Management Office (BCO-DMO) was created in late 2006. Currently, the main BCO-DMO objective is to ensure availability of data resulting from select OCE and Office of Polar Programs (OPP) research awards granted by the US NSF. An important requirement for the BCO-DMO data management system is that it provides open access to data that are supported by sufficient metadata to enable data discovery and accurate reuse. The office manages and serves all types of oceanographic data (in situ, experimental, model results) generated during the research process and contributed by the originating investigators from large national programs and medium-sized collaborative research projects, as well as researchers with single investigator awards. BCO-DMO staff members have made strategic use of standards and use of terms from controlled vocabularies while balancing the need to maintain flexible data ingest systems that accommodate the heterogeneous nature of ocean biogeochemistry and ecological research data. Many of the discrete ocean biogeochemistry data sets managed by BCO-DMO are still acquired manually, often with prototype sensor systems. Data sets such as these that are not "born-digital" present a significant management challenge. Use of multiple levels of term-mappings and development of an ontology has enabled BCO-DMO to incorporate a semantically enabled faceted search into the data access system that will improve data access through enhanced data discovery. BCO-DMO involves an ongoing collaboration between data managers and marine scientists funded by the US NSF. BCO-DMO staff members work with investigators throughout the data life cycle, beginning with the data management plan that is part of the original proposal, during cruise planning and experimental design, through data reporting to meet funding agency requirements and finally to submission of final data sets for publication and final archive in a permanent data center. It is important to note that support from and continued active involvement of the NSF program managers has been a significant contributor to the success of this developing system. URL: http://bco-dmo.org/

  2. Final Progress Report for Award DE-FG07-05ID14637.pdf

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cathy Dixon

    2012-03-09

    2004-2011 Final Report for AFCI University Fellowship Program. The goal of this effort was to be supportive of university students and university programs - particularly those students and programs that will help to strengthen the development of nuclear-related fields. The program also supported the stability of the nuclear infrastructure and developed research partnerships that are helping to enlarge the national nuclear science technology base. In this fellowship program, the U.S. Department of Energy sought master's degree students in nuclear, mechanical, or chemical engineering, engineering/applied physics, physics, chemistry, radiochemistry, or fields of science and engineering applicable to the AFCI/Gen IV/GNEP missionsmore » in order to meet future U.S. nuclear program needs. The fellowship program identified candidates and selected full time students of high-caliber who were taking nuclear courses as part of their degree programs. The DOE Academic Program Managers encouraged fellows to pursue summer internships at national laboratories and supported the students with appropriate information so that both the fellows and the nation's nuclear energy objectives were successful.« less

  3. An integrated approach for improving occupational health and safety management: the voluntary protection program in Taiwan.

    PubMed

    Su, Teh-Sheng; Tsai, Way-Yi; Yu, Yi-Chun

    2005-05-01

    A voluntary compliance program for occupational health and safety management, Voluntary Protection Programs (VPP), was implemented with a strategy of cooperation and encouragement in Taiwan. Due to limitations on increasing the human forces of inspection, a regulatory-based guideline addressing the essence of Occupational Health and Safety Management Systems (OHSMS) was promulgated, which combined the resources of third parties and insurance providers to accredit a self-improving worksite with the benefits of waived general inspection and a merit contributing to insurance premium payment reduction. A designated institute accepts enterprise's applications, performs document review and organizes the onsite inspection. A final review committee of Council of Labor Affairs (CLA) confers a two-year certificate on an approved site. After ten years, the efforts have shown a dramatic reduction of occupational injuries and illness in the total number of 724 worksites granted certification. VPP worksites, in comparison with all industries, had 49% lower frequency rate in the past three years. The severity rate reduction was 80% in the same period. The characteristics of Taiwan VPP program and international occupational safety and health management programs are provided. A Plan-Do-Check-Act management cycle was employed for pursuing continual improvements to the culture fostered. The use of a quantitative measurement for assessing the performance of enterprises' occupational safety and health management showed the efficiency of the rating. The results demonstrate that an employer voluntary protection program is a promising strategy for a developing country.

  4. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  5. Application of the Convergence Technique to Basic Studies of the Reading Process. Final Report.

    ERIC Educational Resources Information Center

    Gephart, William J.

    This study covers a program of research on problems in the area of reading undertaken and supported by the U. S. Office of Education. Due to the effectiveness of the Convergence Technique in the planning and management of complex programs of bio-medical research, this project is undertaken to develop plans for the application of this technique in…

  6. E-Quality in the Workplace: Quality Circles or Quality of Working Life Programs in the US.

    ERIC Educational Resources Information Center

    Savage, Grant T.; Romano, Richard

    Quality Circle (QC) and Quality of Working Life (QWL) in the United States are similar in that both stress participative decision making, preserve management's prerogative to have the final say, and are voluntary. QC and QWL programs differ, however, in that labor unions are more involved in QWLs; QCs deal only with technical problems related to…

  7. An Analysis of Competencies for Managing Science and Technology Programs

    DTIC Science & Technology

    2008-03-19

    competency modeling through a two-year task force commissioned by the Society for Industrial and Organizational Psychology (Shippmann and others, 2000:704...positions—specifically within Research and Development (R&D) programs. If so, the final investigative question tests whether those differences are...statistics are used to analyze the comparisons through hypothesis testing and t- tests relevant to the research investigative questions. These

  8. Appendixes L-P. Vol. II, A Plan for Managing the Development, Implementation and Operation of a Model Elementary Teacher Education Program.

    ERIC Educational Resources Information Center

    Oregon Coll. of Education, Monmouth.

    Five appendixes make up this part of the final report on the elementary teacher education program. Appendix L is a summary chart of the orientation meetings, giving dates, locations, and participants. Appendix M is a listing of the seven school districts actively participating in the OCE coalition, with a brief description of their essential…

  9. Using Classroom Management to Improve Preschoolers' Social and Emotional Skills: Final Impact and Implementation Findings from the Foundations of Learning Demonstration in Newark and Chicago

    ERIC Educational Resources Information Center

    Morris, Pamela; Lloyd, Chrishana M.; Millenky, Megan; Leacock, Nicole; Raver, C. Cybele; Bangser, Michael

    2013-01-01

    Investments in early childhood programs are widely viewed as a promising strategy to improve the future educational achievement of disadvantaged young children. However, it can be difficult for teachers to maintain program quality if children in the classroom display challenging behaviors. For example, when some children act out aggressively or…

  10. Defense Acquisition Research Journal (ARJ). Volume 22, Number 3, Issue 74, July 2015

    DTIC Science & Technology

    2016-04-05

    DoD acquisition system and is not limited to government or contractor personnel. • Employees of the federal government (including military personnel...Incentives • Agile Program Management • Incorporating Foreign Military Sales and Direct Contractor Sales Strategies into Programs • Controlling...projected final cost overruns estimated by contractor and government personnel. The comparison shows that the overruns projected by the contractor and

  11. Optimization Research of Generation Investment Based on Linear Programming Model

    NASA Astrophysics Data System (ADS)

    Wu, Juan; Ge, Xueqian

    Linear programming is an important branch of operational research and it is a mathematical method to assist the people to carry out scientific management. GAMS is an advanced simulation and optimization modeling language and it will combine a large number of complex mathematical programming, such as linear programming LP, nonlinear programming NLP, MIP and other mixed-integer programming with the system simulation. In this paper, based on the linear programming model, the optimized investment decision-making of generation is simulated and analyzed. At last, the optimal installed capacity of power plants and the final total cost are got, which provides the rational decision-making basis for optimized investments.

  12. 75 FR 50932 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... town of Gay Head (Aquinnah), Massachusetts, taken into trust by the Department of the Interior for the Wampanoag Tribal Council of Gay Head, Inc., as authorized by the Wampanoag Tribal Council of Gay Head, Inc...

  13. Marketing Education Computer Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. School of Education.

    A project developed computer software based upon Interstate Distributive Education Curriculum Consortium (IDECC) competency-based materials to produce a new curriculum management system for Pennsylvania secondary marketing education programs. During the project, an advisory committee composed of secondary marketing teachers, business people, and…

  14. Shuttle era waste management and biowaste monitoring

    NASA Technical Reports Server (NTRS)

    Sauer, R. L.; Fogal, G. L.

    1976-01-01

    The acquisition of crew biomedical data has been an important task on manned space missions. The monitoring of biowastes from the crew to support water and mineral balance studies and endocrine studies has been a valuable part of this activity. This paper will present a review of waste management systems used in past programs. This past experience will be cited as to its influence on the Shuttle design. Finally, the Shuttle baseline waste management system and the proposed Shuttle biomedical measurement and sampling systems will be presented.

  15. Cockpit management and Specific Behavioral Objectives (SBOs)

    NASA Technical Reports Server (NTRS)

    Mudge, R. W.

    1987-01-01

    One of the primary tools used to accomplish the task of effective training is the specific behavioral objective (SBO). An SBO is simply a statement which specifically identifies a small segment of the final behavior sought, and a little more. The key word is specific. The company pinpoints exactly what it is it wants the pilot to do after completing training, and what it should evaluate from the point of view of both the program and the pilot. It tells the junior crewmember exactly, specifically, what he should monitor and support insofar as the management function is concerned. It gives greater meaning to the term second in command. And finally, it tells the supervisory pilot exactly what he should observe, evaluate, and instruct, insofar as the management function is concerned.

  16. Needs assessment final report

    NASA Technical Reports Server (NTRS)

    Sepulveda, Jose A.

    1992-01-01

    The stated purposes of the Management Science Faculty Fellowship Project were to: (1) provide a comprehensive analysis of KSC management training for engineers and other management professionals from project/program lead through executive levels; and (2) development of evaluation methodologies which can be used to perform ongoing program-wide course-to-course assessments. This report will focus primarily in the first stated purpose for the project. Ideally, the analysis of KSC management training will build in the current system and efficiently propose improvements to achieve existing goals and objectives while helping to identify new visions and new outcomes for the Center's Management Training Mission. Section 2 describes the objectives, approach, and specific tasks used to analyze KSC's Management training System. Section 3 discusses the main conclusions derived from an analysis of the available training data. Section 4 discusses the characteristics and benefits envisioned for a Management Training System. Section 5 proposes a Training System as identified by the results of a Needs Assessment exercise conducted at KSC this summer. Section 6 presents a number of recommendations for future work.

  17. Intervention mapping protocol for developing a theory-based diabetes self-management education program.

    PubMed

    Song, Misoon; Choi, Suyoung; Kim, Se-An; Seo, Kyoungsan; Lee, Soo Jin

    2015-01-01

    Development of behavior theory-based health promotion programs is encouraged with the paradigm shift from contents to behavior outcomes. This article describes the development process of the diabetes self-management program for older Koreans (DSME-OK) using intervention mapping (IM) protocol. The IM protocol includes needs assessment, defining goals and objectives, identifying theory and determinants, developing a matrix to form change objectives, selecting strategies and methods, structuring the program, and planning for evaluation and pilot testing. The DSME-OK adopted seven behavior objectives developed by the American Association of Diabetes Educators as behavioral outcomes. The program applied an information-motivation-behavioral skills model, and interventions were targeted to 3 determinants to change health behaviors. Specific methods were selected to achieve each objective guided by IM protocol. As the final step, program evaluation was planned including a pilot test. The DSME-OK was structured as the 3 determinants of the IMB model were intervened to achieve behavior objectives in each session. The program has 12 weekly 90-min sessions tailored for older adults. Using the IM protocol in developing a theory-based self-management program was beneficial in terms of providing a systematic guide to developing theory-based and behavior outcome-focused health education programs.

  18. The role of disease management in pay-for-performance programs for improving the care of chronically ill patients.

    PubMed

    Beich, Jeff; Scanlon, Dennis P; Ulbrecht, Jan; Ford, Eric W; Ibrahim, Ibrahim A

    2006-02-01

    To date, pay-for-performance programs targeting the care of persons with chronic conditions have primarily been directed at physicians and provide an alternative to health plan-sponsored chronic disease management (DM) programs. Both approaches require similar infrastructure, and each has its own advantages and disadvantages for program implementation. Pay-for-performance programs use incentives based on patient outcomes; however, an alternative system might incorporate measures of structure and process. Using a conceptual framework, the authors explore the variation in 50 diabetes DM programs using data from the 2002 National Business Coalition on Health's eValue8 Request for Information (RFI). The authors raise issues relevant to the assignment of accountability for patient outcomes to either health plans or physicians. They analyze the association between RFI scores measuring structures and processes, and HEDIS diabetes intermediate outcome measures. Finally, the strengths and weaknesses of using the RFI scores as an alternative metric for pay-for-performance programs are discussed.

  19. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  20. Programming Deep Brain Stimulation for Tremor and Dystonia: The Toronto Western Hospital Algorithms.

    PubMed

    Picillo, Marina; Lozano, Andres M; Kou, Nancy; Munhoz, Renato Puppi; Fasano, Alfonso

    2016-01-01

    Deep brain stimulation (DBS) is an effective treatment for essential tremor (ET) and dystonia. After surgery, a number of extensive programming sessions are performed, mainly relying on neurologist's personal experience as no programming guidelines have been provided so far, with the exception of recommendations provided by groups of experts. Finally, fewer information is available for the management of DBS in ET and dystonia compared with Parkinson's disease. Our aim is to review the literature on initial and follow-up DBS programming procedures for ET and dystonia and integrate the results with our current practice at Toronto Western Hospital (TWH) to develop standardized DBS programming protocols. We conducted a literature search of PubMed from inception to July 2014 with the keywords "balance", "bradykinesia", "deep brain stimulation", "dysarthria", "dystonia", "gait disturbances", "initial programming", "loss of benefit", "micrographia", "speech", "speech difficulties" and "tremor". Seventy-six papers were considered for this review. Based on the literature review and our experience at TWH, we refined three algorithms for management of ET, including: (1) initial programming, (2) management of balance and speech issues and (3) loss of stimulation benefit. We also depicted algorithms for the management of dystonia, including: (1) initial programming and (2) management of stimulation-induced hypokinesia (shuffling gait, micrographia and speech impairment). We propose five algorithms tailored to an individualized approach to managing ET and dystonia patients with DBS. We encourage the application of these algorithms to supplement current standards of care in established as well as new DBS centers to test the clinical usefulness of these algorithms in supplementing the current standards of care. Copyright © 2016 Elsevier Inc. All rights reserved.

  1. Measuring conflict management, emotional self-efficacy, and problem solving confidence in an evaluation of outdoor programs for inner-city youth in Baltimore, Maryland.

    PubMed

    Caldas, Stephanie V; Broaddus, Elena T; Winch, Peter J

    2016-08-01

    Substantial evidence supports the value of outdoor education programs for promoting healthy adolescent development, yet measurement of program outcomes often lacks rigor. Accurately assessing the impacts of programs that seek to promote positive youth development is critical for determining whether youth are benefitting as intended, identifying best practices and areas for improvement, and informing decisions about which programs to invest in. We generated brief, customized instruments for measuring three outcomes among youth participants in Baltimore City Outward Bound programs: conflict management, emotional self-efficacy, and problem solving confidence. Measures were validated through exploratory and confirmatory factor analyses of pilot-testing data from two groups of program participants. We describe our process of identifying outcomes for measurement, developing and adapting measurement instruments, and validating these instruments. The finalized measures support evaluations of outdoor education programs serving urban adolescent youth. Such evaluations enhance accountability by determining if youth are benefiting from programs as intended, and strengthen the case for investment in programs with demonstrated success. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Evaluation Results of the CDC/ASPH Institute for HIV Prevention Leadership: A Capacity-building Educational Program for HIV Prevention Program Managers

    PubMed Central

    Richter, Donna L.; Dauner, Kim Nichols; Lindley, Lisa L.; Reininger, Belinda M.; Oglesby, Willie H.; Prince, Mary S.; Thompson-Robinson, Melva; Jones, Rhondette; Potts, Linda H.

    2011-01-01

    Objective The goal of this research was to evaluate changes over time in the capacity of participants of the CDC/ASPH Institute for HIV Prevention Leadership (Institute), a capacity-building program for HIV prevention program managers in minority-based, community-based organizations, Capacity was defined as the application of new skills and knowledge to participants’ jobs and confidence in using those new skills and knowledge to strategically manage and apply “best practices” to their HIV prevention activities. Methods This is a longitudinal study involving measuring scholar capacity at three points in time; pre-Institute, post-Institute, and 6 months’ post-Institute. Only responses from participants who completed all three surveys are included in this final analysis of the data (N = 94). Results Results indicate that participants from 3 years of the institute (2002–2004) increased their capacity in HIV prevention programming and strategic planning and management. Significant changes were seen in the frequency and self-efficacy with which participants conduct several HIV prevention programming activities. Participants also reported conducting strategic planning activities at more appropriate intervals and were significantly more confident in conducting these activities. Conclusion The Institute has positively and significantly increased the capacity of participants to conduct more effective HIV prevention programs on a national level. PMID:17159470

  3. 76 FR 36879 - Minnesota: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... Phase II--Universal Treatment Standards, and Treatment Standards for Organic Toxicity Characteristic... Disposal Facilities and Hazardous Waste Generators; Organic Air Emissions Standards for Tanks, Surface... Generators; Organic Air Emissions Standards for Tanks, Surface Impoundments, and Containers; Clarification...

  4. New Concepts in Electromagnetic Materials and Antennas

    DTIC Science & Technology

    2015-01-01

    Bae-Ian Wu Antennas & Electromagnetics Technology Branch Multispectral Sensing & Detection Division JANUARY 2015 Final Report...Signature// //Signature// BRADLEY A. KRAMER, Program Manager TONY C. KIM, Branch Chief Antenna & Electromagnetic Technology ...Branch Antenna & Electromagnetic Technology Branch Multispectral Sensing & Detection Division Multispectral Sensing & Detection Division

  5. Evaluation of the commercial vehicle information systems and networks (CVISN) model deployment initiative. Volume I, Final report

    DOT National Transportation Integrated Search

    2002-03-01

    The Commercial Vehicle Information Systems and Networks Model Deployment Initiative (CVISN MDI) is funded by the Intelligent Transportation Systems Joint Program Office (ITS JPO) and managed by the Federal Motor Carrier Safety Administration (FMCSA),...

  6. 75 FR 38985 - Certain Frozen Fish Fillets From the Socialist Republic of Vietnam: Final Results of the Fifth...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... to the File, through Alex Villanueva, Program Manager, AC/CVD Operations, Office 9, from Javier... assess, antidumping duties on all appropriate entries, pursuant to 19 CFR 351.212(b). We have calculated...

  7. Sustainable Range Management of RDX and TNT by Phytoremediation with Engineered Plants

    DTIC Science & Technology

    2016-04-01

    FINAL REPORT Sustainable Range Management of RDX and TNT by Phytoremediation with Engineered Plants SERDP Project ER-1498 APRIL 2016...specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its...by Phyoremediation with Engineered Plants 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER ER-1498 Neil C

  8. JPL-20170915-CASSINf-0002-Cassini End of Mission Post Event Press ConferenceAVAIL

    NASA Image and Video Library

    2017-09-15

    This press briefing summarizes the end of NASA-ESA's Cassini-Huygens mission to Saturn and presents the final images made by the spacecraft before its planned disintegration in Saturn's atmosphere on September 15, 2017. Featured: Earl Maize, Cassini Program Manager, JPL; Linda Spilker, Cassini Project Scientist, JPL; Julie Webster, Cassini Spacecraft operations Manager, JPL; and Thomas Zurbuchen, Associate Administrator, Science Mission Directorate, NASA HQ.

  9. Discovery management workshop

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Two dozen participants assembled under the direction of the NASA Solar System Exploration Division (SEED) April 13-15, 1993. Participants supported the goals of cheaper and faster solar system exploration. The workshop concluded that the Discovery Program concept and goals are viable. Management concerns are articulated in the final report. Appendix A includes lists of participants in alphabetical order, by functional area, and by organization type. Appendix B includes the agenda for the meeting.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Mark J; Efroymson, Rebecca Ann; Adams, Marshall

    The long-term ecological recovery of an impaired stream in response to an industrial facility's pollution abatement actions and the implications of the biological monitoring effort to environmental management is the subject of this special issue of Environmental Management. This final article focuses on the synthesis of the biological monitoring program's components and methods, the efficacy of various biological monitoring techniques to environmental management, and the lessons learned from the program that might be applicable to the design and application of other programs. The focus of the 25-year program has been on East Fork Poplar Creek, an ecologically impaired stream inmore » Oak Ridge, Tennessee with varied and complex stressors from a Department of Energy facility in its headwaters. Major components of the long-term program included testing and monitoring of invertebrate and fish toxicity, bioindicators of fish health, fish contaminant accumulation, and instream communities (including periphyton, benthic macroinvertebrate, and fish). Key parallel components of the program include water chemistry sampling and data management. Multiple lines of evidence suggested positive ecological responses during three major pollution abatement periods. Based on this case study and the related literature, effective environmental management of impaired streams starts with program design that is consistent across space and time, but also adaptable to changing conditions. The biological monitoring approaches used for the program provided a strong basis for assessments of recovery from remedial actions, and the likely causes of impairment. This case study provides a unique application of multidisciplinary and quantitative techniques to address multiple and complex regulatory and programmatic goals, environmental stressors, and remedial actions.« less

  11. A coordinated teaching program for future dairy practitioners at the university of Wisconsin-Madison, School of Veterinary Medicine.

    PubMed

    Cook, Nigel B; Eisele, Christian O; Klos, Rachel F; Bennett, Thomas B; McGuirk, Sheila M; Goodger, William J; Oetzel, Garrett R; Nordlund, Kenneth V

    2004-01-01

    The University of Wisconsin School of Veterinary Medicine (UW-SVM) has implemented a variety of strategies to optimize teaching in dairy herd medicine. These include the provision of opportunities for dairy cow handling and management using a dairy teaching herd for veterinary students throughout the four-year curriculum, exposure for all students in their final year to a substantial first-opinion dairy case load using a private practice-based ambulatory clinic rotation, and, finally, the teaching of dairy herd health management and problem solving in a group of four final-year elective production medicine clinical rotations. On average, since 1986, 32.6% of each graduating class attended at least one elective production medicine rotation, with a range from 19.0% to 43.4%. For those University of Wisconsin students who could be traced, 65% were still actively involved in some aspect of dairy practice, representing a range of between seven and 17 students per year since the start of the program. The advantages and disadvantages of operating a "regional center of excellence" for training students from out-of-state institutions are discussed.

  12. Methods for Streamlining Intervention Fidelity Checklists: An Example from the Chronic Disease Self-Management Program

    PubMed Central

    Ahn, SangNam; Smith, Matthew Lee; Altpeter, Mary; Belza, Basia; Post, Lindsey; Ory, Marcia G.

    2015-01-01

    Maintaining intervention fidelity should be part of any programmatic quality assurance (QA) plan and is often a licensure requirement. However, fidelity checklists designed by original program developers are often lengthy, which makes compliance difficult once programs become widely disseminated in the field. As a case example, we used Stanford’s original Chronic Disease Self-Management Program (CDSMP) fidelity checklist of 157 items to demonstrate heuristic procedures for generating shorter fidelity checklists. Using an expert consensus approach, we sought feedback from active master trainers registered with the Stanford University Patient Education Research Center about which items were most essential to, and also feasible for, assessing fidelity. We conducted three sequential surveys and one expert group-teleconference call. Three versions of the fidelity checklist were created using different statistical and methodological criteria. In a final group-teleconference call with seven national experts, there was unanimous agreement that all three final versions (e.g., a 34-item version, a 20-item version, and a 12-item version) should be made available because the purpose and resources for administering a checklist might vary from one setting to another. This study highlights the methodology used to generate shorter versions of a fidelity checklist, which has potential to inform future QA efforts for this and other evidence-based programs (EBP) for older adults delivered in community settings. With CDSMP and other EBP, it is important to differentiate between program fidelity as mandated by program developers for licensure, and intervention fidelity tools for providing an “at-a-glance” snapshot of the level of compliance to selected program indicators. PMID:25964941

  13. Digital Equipment Corporation VAX/VMS Version 4.3

    DTIC Science & Technology

    1986-07-30

    operating system performs process-oriented paging that allows execution of programs that may be larger than the physical memory allocated to them... to higher privileged modes. (For an explanation of how the four access modes provide memory access protection see page 9, "Memory Management".) A... to optimize program performance for real-time applications or interactive environments. July 30, 1986 - 4 - Final Evaluation Report Digital VAX/VMS

  14. KSC-2010-4883

    NASA Image and Video Library

    2010-09-28

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, John Casper, Assistant Space Shuttle Program manager and Kennedy Center Director Bob Cabana talk with each other during a ceremony being held to commemorate the move from Kennedy's Assembly Refurbishment Facility (ARF) to the Vehicle Assembly Building (VAB) of the Space Shuttle Program's final solid rocket booster structural assembly -- the right-hand forward. The move was postponed because of inclement weather. Photo credit: NASA/Kim Shiflett

  15. The Army Pollution Prevention Program: Improving Performance Through Benchmarking.

    DTIC Science & Technology

    1995-06-01

    Washington, DC 20503. 1. AGENCY USE ONLY (Leave Blank) 2. REPORT DATE June 1995 3. REPORT TYPE AND DATES COVERED Final 4. TITLE AND SUBTITLE...unlimited 12b. DISTRIBUTION CODE 13. ABSTRACT (Maximum 200 words) This report investigates the feasibility of using benchmarking as a method for...could use to determine to what degree it should integrate benchmarking with other quality management tools to support the pollution prevention program

  16. Effectiveness of Pavement Management System and its Effects to the Closing of Final Account in Construction Project in Malaysia

    NASA Astrophysics Data System (ADS)

    Zakaria, Zarabizan; Ismail, Syuhaida; Yusof, Aminah Md

    2013-04-01

    Federal roads maintenance needs a systematic and effective mechanism to ensure that the roads are in good condition and provide comfort to the road user. In implementing effective maintenance, budget is main the factor limiting this endeavor. Thus Public Works Department (PWD) Malaysia used Highway Development and Management (HDM-4) System to help the management of PWD Malaysia in determining the location and length of the road to be repaired according to the priority based on its analysis. For that purpose, PWD Malaysia has applied Pavement Management System (PMS) which utilizes HDM-4 as the analysis engine to conduct technical and economic analysis in generating annual work programs for pavement maintenance. As a result, a lot of feedback and comment have been received from Supervisory and Roads Maintenance Unit (UPPJ) Zonal on the accuracy of the system output and problems that arise in the closing of final account. Therefore, the objective of this paper is to evaluate current system accuracy in terms of generating the annual work program for periodic pavement maintenance, to identify factors contributing to the system inaccuracy in selecting the location and length of roads that require for treatment and to propose improvement measures for the system accuracy. The factors affecting the closing of final account caused by result received from the pavement management system are also defined. The scope of this paper is on the existing HDM-4 System which cover four states specifically Perlis, Selangor, Kelantan and Johor which is analysed via the work program output data for the purpose of evaluating the system accuracy. The method used in this paper includes case study, interview, discussion and analysis of the HDM-4 System output data. This paper has identified work history not updated and the analysis is not using the current data as factors contributing to the system accuracy. From the result of this paper, it is found that HDM-4's system accuracy used by PWD Malaysia attains average 65 per cent only and had not achieved level that had been set by PWD Malaysia namely 80 per cent. Hence, this paper has revealed the causes of the occurrances in the pavement management system in construction project in Malaysia and investigated the consequences of the late payments and final account problems confronted by contractors in Malaysia, which eventually proposed strategic actions that could be taken by the contractors in securing their payments.

  17. Mobilizable RDF/d-RDF burning program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niemann, K.; Campbell, J.

    1982-03-01

    The Mobilizable RDF/d-RDF Burning Program was conceived to promote the utilization of refuse-derived fuels (RDF) as a supplement to existing fossil fuel sources in industrial-sized boilers. The program explores the design, development, and eventual construction of densified-RDF (d-RDF) for use in boiler combustion testing as a supplement to stoker coal or wood wastes. The equipment would be mounted on trailers and assembled and operated at preselected sites throughout the country where approximately 750 tons of RDF would be produced and test burned in a local boiler. The equipment, to include a transportable RDF boiler metering and feed system, would thenmore » be moved and operated at two to three test sites annually. The program is intended to encourage the construction of permanent resource recovery facilities by involving local waste handling groups in operating the equipment and producing fuel, and potential local fuel users in testing the fuel in their boilers. The Mobilizable Program was developed from two separate tasks. The first task developed the concept behind the program and defined its operational and organizational structure. The second task, a follow-up to the first, was intended principally to finalize test locations, develop equipment designs and specifications, and formalize a management program. This report summarizes the principal findings of both tasks. It identifies the criteria used to identify test locations, outlines the program's management structure, presents design and performance specifications for both the fuel production equipment and boiler fuel feed systems, and provides a detailed evaluation of the parameters involved in burning RDF in industrial-sized boilers. Final conclusions and recommendations identify problem areas encountered in the program, and discuss possible future directions for such a program.« less

  18. Impact of home-based, patient-centered support for people with advanced illness in an open health system: A retrospective claims analysis of health expenditures, utilization, and quality of care at end of life.

    PubMed

    Sudat, Sylvia Ek; Franco, Anjali; Pressman, Alice R; Rosenfeld, Kenneth; Gornet, Elizabeth; Stewart, Walter

    2018-02-01

    Home-based care coordination and support programs for people with advanced illness work alongside usual care to promote personal care goals, which usually include a preference for home-based end-of-life care. More research is needed to confirm the efficacy of these programs, especially when disseminated on a large scale. Advanced Illness Management is one such program, implemented within a large open health system in northern California, USA. To evaluate the impact of Advanced Illness Management on end-of-life resource utilization, cost of care, and care quality, as indicators of program success in supporting patient care goals. A retrospective-matched observational study analyzing medical claims in the final 3 months of life. Medicare fee-for-service 2010-2014 decedents in northern California, USA. Final month total expenditures for Advanced Illness Management enrollees ( N = 1352) were reduced by US$4824 (US$3379, US$6268) and inpatient payments by US$6127 (US$4874, US$7682). Enrollees also experienced 150 fewer hospitalizations/1000 (101, 198) and 1361 fewer hospital days/1000 (998, 1725). The percentage of hospice enrollees increased by 17.9 percentage points (14.7, 21.0), hospital deaths decreased by 8.2 percentage points (5.5, 10.8), and intensive care unit deaths decreased by 7.1 percentage points (5.2, 8.9). End-of-life chemotherapy use and non-inpatient expenditures in months 2 and 3 prior to death did not differ significantly from the control group. Advanced Illness Management has a positive impact on inpatient utilization, cost of care, hospice enrollment, and site of death. This suggests that home-based support programs for people with advanced illness can be successful on a large scale in supporting personal end-of-life care choices.

  19. Professional Development and TransLink[R]. Final Report.

    ERIC Educational Resources Information Center

    Kuhn, Beverly T.; Jasek, Deborah

    This report covers one segment of a larger professional development program for transportation professionals that addresses the need to develop a larger cadre of transportation professionals capable of designing, planning, managing, operating, and maintaining the transportation infrastructure nationwide. Three specific tasks were undertaken and…

  20. 78 FR 48048 - Student Assistance General Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... DEPARTMENT OF EDUCATION 34 CFR Part 668 RIN 1880-AA87 Student Assistance General Provisions AGENCY: Office of Hearings & Appeals, Office of Management, Department of Education. ACTION: Final regulations... participation in the student financial assistance programs authorized under Title IV of the Higher Education Act...

  1. Best management practices for establishment of salt-tolerant grasses on roadsides : final report.

    DOT National Transportation Integrated Search

    2017-07-01

    Roadsides are a unique growing environment for turf grasses and can be a challenge to establish and maintain. The University of Minnesota turf grass research program has been investigating low-input turf grasses that are better adapted for roadsides ...

  2. 76 FR 62303 - California: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-07

    ...) Land Disposal Restrictions Phase IV--Treatment Standards for Wood Preserving Wastes, Paperwork... the Carbamate Land Disposal Restrictions; (5) Clarification of Standards for Hazardous Waste LDR...) Emergency Revision of the Land Disposal Restrictions (LDR) Treatment Standards for Listed Hazardous Wastes...

  3. Notes from the field: the economic value chain in disease management organizations.

    PubMed

    Fetterolf, Donald

    2006-12-01

    The disease management (DM) "value chain" is composed of a linear series of steps that include operational milestones in the development of knowledge, each stage evolving from the preceding one. As an adaptation of Michael Porter's "value chain" model, the process flow in DM moves along the following path: (1) data/information technology, (2) information generation, (3) analysis, (4) assessment/recommendations, (5) actionable customer plan, and (6) program assessment/reassessment. Each of these stages is managed as a major line of product operations within a DM company or health plan. Metrics around each of the key production variables create benchmark milestones, ongoing management insight into program effectiveness, and potential drivers for activity-based cost accounting pricing models. The value chain process must remain robust from early entry of data and information into the system, through the final presentation and recommendations for our clients if the program is to be effective. For individuals involved in the evaluation or review of DM programs, this framework is an excellent method to visualize the key components and sequence in the process. The value chain model is an excellent way to establish the value of a formal DM program and to create a consultancy relationship with a client involved in purchasing these complex services.

  4. Environmental management requirements/defensible costs project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operationsmore » Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.« less

  5. Cryogenic fluid management program at MSFC

    NASA Technical Reports Server (NTRS)

    Schmidt, G. R.; Hastings, L. J.

    1990-01-01

    Cryogenic fluid management (CFM) is an important aspect in the design and operation of spacecraft propellant systems. Consequently, it represents a key technology in the development of future vehicles for orbital transfer, lunar transit and manned interplanetary (i.e., Mars) missions. Because of Marshall Space Flight Center's (MSFC's) leading role in the definition of such vehicles, the center is currently managing and conducting a variety of tests to support development of this technology. The purpose of this paper is to summarize these activities and present their status within the context of CFM technology requirements. The first section reviews MSFC's role, identifies the major emphases and thrusts of its program, and presents the overall schedule. The final part comprises the bulk of the report, and describes at length the objectives, approach and status of each project.

  6. Advanced Commercial Buildings Initiative Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Sydney G.

    The Southface Advanced Commercial Buildings Initiative has developed solutions to overcome market barriers to energy reductions in small commercial buildings by building on the success of four local and Southeast regional energy efficiency deployment programs. These programs address a variety of small commercial building types, efficiency levels, owners, facility manager skills and needs for financing. The deployment programs also reach critical private sector, utility, nonprofit and government submarkets, and have strong potential to be replicated at scale. During the grant period, 200 small commercial buildings participated in Southface-sponsored energy upgrade programs, saving 166,736,703 kBtu of source energy.

  7. Implementing Laboratory Quality Management Systems in Mozambique: The Becton Dickinson-US President's Emergency Plan for AIDS Relief Public-Private Partnership Initiative.

    PubMed

    Skaggs, Beth; Pinto, Isabel; Masamha, Jessina; Turgeon, David; Gudo, Eduardo Samo

    2016-04-15

    Mozambique's ministry of health (MOH) recognized the need to establish a national laboratory quality assurance (NLQA) program to improve the reliability and accuracy of laboratory testing. The Becton Dickinson-US President's Emergency Plan for AIDS Relief Public-Private Partnership (PPP) was used to garner MOH commitment and train a cadre of local auditors and managers to support sustainability and country ownership of a NLQA program. From January 2011 to April 2012, the World Health Organization Regional Office for Africa Stepwise Laboratory Quality Improvement Process Towards Accreditation (SLIPTA) checklist and the Strengthening Laboratory Management Towards Accreditation (SLMTA) curriculum were used in 6 MOH laboratories. PPP volunteers provided training and mentorship to build the capacity of local auditors and program managers to promote institutionalization and sustainability of the program within the MOH. SLIPTA was launched in 6 MOH laboratories, and final audits demonstrated improvements across the 13 quality system essentials, compared with baseline. Training and mentorship of MOH staff by PPP volunteers resulted in 18 qualified auditors and 28 managers/quality officers capacitated to manage the improvement process in their laboratories. SLIPTA helps laboratories improve the quality and reliability of their service even in the absence of full accreditation. Local capacity building ensures sustainability by creating country buy-in, reducing costs of audits, and institutionalizing program management. Published by Oxford University Press for the Infectious Diseases Society of America 2016. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frenkel, G.; Paterson, T.S.; Smith, M.E.

    The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less

  9. A leadership-management training curriculum for pathology residents.

    PubMed

    Sims, K L; Darcy, T P

    1997-07-01

    Leadership and management skills are increasingly critical to the success of pathologists in and outside of academic centers. We describe a leadership and management curriculum in a combined anatomic and clinical pathology residency program. The mentor-based approach incorporates leadership and management skills throughout the residency with a dedicated 2-month rotation during the final year of training. This 2-month rotation is led by a senior faculty pathologist mentor and includes active participation in management activities, small group discussions, reading, and a management process project. The topics for the small group discussions, reading list, mentor-based activities, and completed management process projects are described. Outcomes and evaluations are reported for residents who have completed this curriculum in leadership and management.

  10. Test Area C-62 Final Range Environmental Assessment at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2015-06-05

    requirements to submit with EPCRA reports. Federal agencies must comply. Air Armament Center Plan 32-3; January 2004; Asbestos Management Plan; This...plan establishes procedures for the Eglin Air Force Base (AFB) facility asbestos management program. It contains the policies and procedures used in...controlling the health hazards created by asbestos containing materials (ACM), and the procedures used in ACM removal required to protect the health

  11. Final Environmental Assessment and Finding of No Significant Impact Proposed Running Track Hanscom AFB, Bedford, Massachusetts

    DTIC Science & Technology

    2004-09-01

    agency response letters are included in Appendix B. Mr. Robert W. GoUedge, Jr. Commissioner, MADEP: No Comment Mr. Garry C. Waldeck MADEP...Headquarters: -Requested copy of Environmental Assessment ( No comment ). Mr. David Shakespeare MADEP - BWSC: No Comment Mr. James Sprague , ·. MADEP, NERO...Division of Watershed Management - Wetlands Program: No Comment · Mr. John Zajac MADEP, NERO Division ofWatershed Management: No Comment Mr. Todd

  12. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  13. Alcohol management in community sports clubs: impact on viability and participation.

    PubMed

    Crundall, Ian

    2012-08-01

    Whether improved alcohol management delivers additional benefits to clubs in the form of financial viability, expanded membership, increased spectators and greater capacity for competition. Measures were derived from 657 Australian community sporting clubs enrolled in the Good Sports program. The program assists clubs to manage alcohol through an accreditation process that sets minimum standards for regulatory compliance, club practices and policies. Measures were taken from survey information collected prior to Level 1 accreditation and at the third and final level of club accreditation. Income was found to increase and reliance on alcohol as a funding source was found to diminish over time. Membership increased and was accelerated among females, young people and non-players. No changes in the number of junior and senior teams or players were found. Improved alcohol management can produce a range of benefits beyond responsible drinking patterns that add to club sustainability.

  14. Accounting for location and timing in NO{sub x} emission trading programs. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nichols, A.L.

    1997-12-01

    This report describes approaches to designing emission trading programs for nitrogen oxides (NO{sub x}) to account for the locations of emission sources. When a trading region is relatively small, program managers can assume that the location of the sources engaging in trades has little or no effect. However, if policy makers extend the program to larger regions, this assumption may be questioned. Therefore, EPRI has undertaken a survey of methods for incorporating location considerations into trading programs. Application of the best method may help to preserve, and even enhance, the flexibility and savings afforded utilities by emission trading.

  15. Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-10-01

    This document is the second volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of failure modes and effects analysis; accident analysis; operational safety requirements; quality assurance program; ES&H management program; environmental, safety, and health systems critical to safety; summary of waste-management program; environmental monitoring program; facility expansion, decontamination, and decommissioning; summary of emergency response plan; summary plan for employee training; summary plan for operating procedures; glossary; and appendices A and B.« less

  16. Public relations effectiveness in public health institutions.

    PubMed

    Springston, Jeffrey K; Weaver Lariscy, Ruth Ann

    2005-01-01

    This article explores public relations effectiveness in public health institutions. First, the two major elements that comprise public relations effectiveness are discussed: reputation management and stakeholder relations. The factors that define effective reputation management are examined, as are the roles of issues and crisis management in building and maintaining reputation. The article also examines the major facets of stakeholder relations, including an inventory of stakeholder linkages and key audiences, such as the media. Finally, methods of evaluating public relations effectiveness at both the program level and the institutional level are explored.

  17. Final Creech Air Force Base Capital Improvements Program Environmental Assessment

    DTIC Science & Technology

    2013-11-01

    acts as a shell to softer, more vulnerable soils below. Lenses of caliche (sediment cemented together with sodium salts) and clay are also known to be...requirements. Contact Air Quality Program Manager YES Page 2 WATER QUALITY 99 CES/CEIEC, 652-2834 Any process that discharges to sanitary or industrial... Sanitary Wastewater Will the project result in the discharge of any sanitary wastewaters (e.g., wastewater from sinks, showers, toilets, etc)? A

  18. Solid Earth and Natural Hazards (SENH) Research and Applications Program and Internation

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This is a final report for grant NAG5-8627 entitled 'Joint UNAVCO and JPL proposal to NASA for support of the Solid Earth and Natural Hazards Research and Applications Program and Internation'. This report consists of the following sections: (1) new installations (with site visits); (2) upgrades (with site visits; (3) upcoming upgrades (with site visits); and (4) data management and archive efforts during the performance period.

  19. USAF Summer Research Program - 1994 Summer Faculty Research Program, Final Reports, Volume 5A, Wright Laboratory

    DTIC Science & Technology

    1994-12-01

    Developing an Object-oriented S DRGuoxiangGu WL/MNAG 5- 24 Louisiana State University , Baton Rouge , LA Gain Scheduled Missile Autopilot...candidates being notified of their acceptance after scheduled deadlines. The total applicants and participants for 1994 are shown in this table. Table 2...planning and scheduling literature to identify developments that might apply to the design of a sensor manager. Applications examined primarily come

  20. Adult Basic Education Outreach Project. Final Report (Executive Summary).

    ERIC Educational Resources Information Center

    Alberta Vocational Centre, Edmonton.

    An executive report summarizes the Alberta Vocational Centre's development of a portable individualized, competency-based learning system for use in an adult basic education program in a non-institutional community location. The report deals with the project's rationale, development (including management, curricular development, budget, and site…

  1. 24 CFR 266.515 - Record retention.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management... insurance remains in force. (b) Defaults and claims. Records pertaining to a mortgage default and claim must be retained from the date of default through final settlement of the claim for a period of no less...

  2. Air Force Tech Order Management System (AFTOMS). Automation Plan-Final Report. Version 1.0

    DOT National Transportation Integrated Search

    1988-02-01

    Computer aided Acquisition and Logistics Support (CALS) is a Department of Defense (DoD) program designed to improve weapon systems support through digital automation. In June 1985, the joint industry/DoD Task Force on CALS issued a five volume repor...

  3. 5 CFR 890.107 - Court review.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... EMPLOYEES HEALTH BENEFITS PROGRAM Administration and General Provisions § 890.107 Court review. (a) A suit... against the Office of Personnel Management. (c) Federal Employees Health Benefits (FEHB) carriers resolve... judicial review of OPM's final action on the denial of a health benefits claim. A legal action to review...

  4. 77 FR 15039 - Certain Frozen Fish Fillets From the Socialist Republic of Vietnam: Final Results and Partial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... Memo and ``Memorandum to the File, through Matthew Renkey, Acting Program Manager, AC/CVD Operations... Pursuant to section 751(a)(2)(A) of the Act and 19 CFR 351.212(b), the Department will determine, and U.S...

  5. 43 CFR 32.4 - Program operation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for the management of each Corps camp and project, final selection of enrollees, determination of... refer all candidates who self-certify that they meet eligibility requirements to Grantees for selection of those to be enrolled. Self-certification by applicants ages 16 through 18 who have left school...

  6. 29 CFR 1952.354 - Final approval determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... satisfactorily providing reports to OSHA through participation in the Federal-State Unified Management Information System, the Assistant Secretary evaluated actual operations under the State plan for a period of... enterprise; and Indian reservations. (c) Arizona is required to maintain a State program which is at least as...

  7. 29 CFR 1952.354 - Final approval determination.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... satisfactorily providing reports to OSHA through participation in the Federal-State Unified Management Information System, the Assistant Secretary evaluated actual operations under the State plan for a period of... enterprise; and Indian reservations. (c) Arizona is required to maintain a State program which is at least as...

  8. 29 CFR 1952.354 - Final approval determination.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... satisfactorily providing reports to OSHA through participation in the Federal-State Unified Management Information System, the Assistant Secretary evaluated actual operations under the State plan for a period of... enterprise; and Indian reservations. (c) Arizona is required to maintain a State program which is at least as...

  9. Resource Allocation in High Schools. Final Report.

    ERIC Educational Resources Information Center

    Hartman, William T.

    This study investigated the resource allocation process--how school administrators obtain the proper resources to operate their schools, distribute the available resources among the various school programs appropriately, and manage resources for effective educational results--in four high schools during the 1984-85 school year. Information was…

  10. Outdoorsman, Unit III.

    ERIC Educational Resources Information Center

    Alberta Dept. of Agriculture, Edmonton.

    The third and final unit of the 4-H Outdoorsman Program covers the most advanced and challenging campcraft skills for 4-H members in British Columbia, Alberta, Saskatchewan and Manitoba. Survival camping (including building shelters and finding food), in-depth map-reading and orienteering, game management, hiking themes and recordkeeping are all…

  11. An innovative, multidisciplinary educational program in interactive information storage and retrieval. Presentation visuals. M.S. Thesis Final Report, 1 Jul. 1985 - 31 Dec. 1987

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Gallagher, Mary C.

    1985-01-01

    This Working Paper Series entry represents a collection of presentation visuals associated with the companion report entitled An Innovative, Multidisciplinary Educational Program in Interactive Information Storage and Retrieval, USL/DBMS NASA/RECON Working Paper Series report number DBMS.NASA/RECON-12. The project objectives are to develop a set of transportable, hands-on, data base management courses for science and engineering students to facilitate their utilization of information storage and retrieval programs.

  12. Leadership Development Program Final Project

    NASA Technical Reports Server (NTRS)

    Parrish, Teresa C.

    2016-01-01

    TOSC is NASA's prime contractor tasked to successfully assemble, test, and launch the EM1 spacecraft. TOSC success is highly dependent on design products from the other NASA Programs manufacturing and delivering the flight hardware; Space Launch System(SLS) and Multi-Purpose Crew Vehicle(MPCV). Design products directly feed into TOSC's: Procedures, Personnel training, Hardware assembly, Software development, Integrated vehicle test and checkout, Launch. TOSC senior management recognized a significant schedule risk as these products are still being developed by the other two (2) programs; SVE and ACE positions were created.

  13. Implementation of a data management software system for SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, Kenneth

    1986-01-01

    The implementation of a software system for managing Space Shuttle Main Engine (SSME) test/flight historical data is presented. The software system uses the database management system RIM7 for primary data storage and routine data management, but includes several FORTRAN programs, described here, which provide customized access to the RIM7 database. The consolidation, modification, and transfer of data from the database THIST, to the RIM7 database THISRM is discussed. The RIM7 utility modules for generating some standard reports from THISRM and performing some routine updating and maintenance are briefly described. The FORTRAN accessing programs described include programs for initial loading of large data sets into the database, capturing data from files for database inclusion, and producing specialized statistical reports which cannot be provided by the RIM7 report generator utility. An expert system tutorial, constructed using the expert system shell product INSIGHT2, is described. Finally, a potential expert system, which would analyze data in the database, is outlined. This system could use INSIGHT2 as well and would take advantage of RIM7's compatibility with the microcomputer database system RBase 5000.

  14. Medicaid Integrity Program; eligible entity and contracting requirements for the Medicaid Integrity audit program. Final rule.

    PubMed

    2008-09-26

    Section 1936 of the Social Security Act (the Act) (as added by section 6034 of the Deficit Reduction Act of 2005 (DRA) established the Medicaid Integrity Program to promote the integrity of the Medicaid program by requiring CMS to enter into contracts with eligible entities to: (1) Review the actions of individuals or entities furnishing items or services (whether on a fee-for-service, risk, or other basis) for which payment may be made under an approved State plan and/or any waiver of such plan approved under section 1115 of the Act; (2) audit claims for payment of items or services furnished, or administrative services rendered, under a State plan; (3) identify overpayments to individuals or entities receiving Federal funds; and (4) educate providers of services, managed care entities, beneficiaries, and other individuals with respect to payment integrity and quality of care. This final rule will provide requirements for an eligible entity to enter into a contract under the Medicaid integrity audit program. The final rule will also establish the contracting requirements for eligible entities. The requirements will include procedures for identifying, evaluating, and resolving organizational conflicts of interest that are generally applicable to Federal acquisition and procurement; competitive procedures to be used; and procedures under which a contract may be renewed.

  15. RCRA Sustainable Materials Management Information

    EPA Pesticide Factsheets

    This asset includes a broad variety of documents, descriptive data, technical analyses and guidance materials relative to voluntary improvements in resource conservation, the beneficial use of sustainable materials and the management of non-hazardous wastes and materials. Included in this asset are participant information and outreach materials of various voluntary programs relating to better materials and waste management programs. An example is the WasteWise program and Sustainable Materials Management (SMM) Challenges, which help organizations and businesses apply sustainable materials management practices to reduce municipal and select industrial wastes. Also included in this asset are guidance materials to assist municipalities in recycling and reuse of municipal solid waste, including diverting materials to composting, and the use of conversion methods such as anaerobic digestion. Another component are the data necessary to compile reports on the characterization of municipal solid waste (including such waste streams as food waste, yard and wood waste, discarded electronics, and household non-hazardous waste), the recycled content of manufactured goods, and other analyses performed using such tools as the Waste Assessment Reduction Model (WARM).For industrial non-hazardous waste, this asset includes guidance and outreach materials on industrial materials recycling and waste minimization. Finally, this asset includes research analyses on sustainable materia

  16. The "expert patient" approach for non-communicable disease management in low and middle income settings: When the reality confronts the rhetoric.

    PubMed

    Xiao, Yue

    2015-09-01

    This paper seeks to explore the relevance between the Western "expert patient" rhetoric and the reality of non-communicable diseases (NCDs) control and management in low and middle income settings from the health sociological perspective. It firstly sets up a conceptual framework of the "expert patient" or the patient self-management approach, showing the rhetoric of the initiative in the developed countries. Then by examining the situation of NCDs control and management in low income settings, the paper tries to evaluate the possibilities of implementing the "expert patient" approach in these countries. Kober and Van Damme's study on the relevance of the "expert patient" for an HIV/AIDS program in low income settings is critically studied to show the relevance of the developed countries' rhetoric of the "expert patient" approach for the reality of developing countries. In addition, the MoPoTsyo diabetes peer educator program is analyzed to show the challenges faced by the low income countries in implementing patient self-management programs. Finally, applications of the expert patient approach in China are discussed as well, to remind us of the possible difficulties in introducing it into rural settings.

  17. Planning a multilevel intervention to prevent hearing loss among farmworkers and managers: a systematic approach.

    PubMed

    Fernandez, M E; Bartholomew, L K; Alterman, T

    2009-01-01

    Noise-induced hearing loss (NIHL) is the second most prevalent self-reported occupational illness or injury in the U.S., and agricultural workers experience high rates of hearing loss. This article uses Intervention Mapping (IM), a systematic approach to intervention development, to make recommendations for a program to improve hearing loss protection among farmworkers and managers. Final recommendations, based on previous work in the literature on hearing loss prevention, qualitative formative research, and theoretical considerations, include a specification of a multilevel theory- and evidence-based hearing protection program for farmworkers and farm managers. Twelve performance objectives (e.g., "monitor hearing and hearing loss with regular hearing testing") are specified and crossed with six relevant determinants (knowledge and behavioral capability; perceived exposure and susceptibility and noise annoyance; outcome expectations; barriers; social influence; skills and self-efficacy) to create a highly detailed matrix of change objectives for farmworkers and for their managers. These change objectives are then grouped into five categories: two for both farmworkers and their managers (noticing exposures, taking action) and three only for the latter (surveying and planning, implementation and evaluation, and communication). Theoretical methods and practical strategies, including program materials and activities, are then delineated.

  18. Site Selection for the Disposal of LLW in Taiwan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chuang, W.S.; Chi, L.M.; Tien, N.C.

    2006-07-01

    This paper presents the implementation status of the low-level radioactive waste (LLW) disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes and preliminary disposal concepts. The first phase of site selection for low-level radioactive waste final disposal in Taiwan was implemented between 1992 and 2002. The site selection process adopted a Geographic Information System (GIS), Hierarchical Analysis System, Expert Evaluation System, and site reconnaissance. An incentive program for voluntary sites was also initiated. After a series of evaluations and discussion of 30 potentialmore » candidate sites, including 8 recommended sites, 5 qualified voluntary townships, and several remote uninhabited small islets, Hsiao-chiou islet was selected as the first priority candidate site in February 1998. The geological investigation work in Hsiao-chiou was conducted from March 1999 through October 2000. An Environmental Impact Statement Report (EIS) and the Investment Feasibility Study Report (IFS) were submitted to the Environmental Protection Agency (EPA) in November 2000 and to the Ministry of Economic Affairs (MOEA) in June 2001, respectively. Unfortunately, the site investigation was discontinued in 2002 due to political and public acceptance consideration. After years of planning, the second phase of the site selection process was launched in August 2004 and will be conducted through 2008. It is planned that a repository will be constructed in early 2009 and start to operate in 2014. The site selection process for the second phase is based on the earlier work and four potential candidate sites were selected for evaluation until 2005. A near surface disposal concept is proposed for a site located in the Taiwan strait, and cavern disposal concepts are proposed for three other sites located on the main island. This paper presents the implementation status of the LLW disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes, and preliminary disposal concepts 'NIMBY' (Not in my backyard) is a critical problem for implementation of the final disposal project. Resistance from local communities has been continuously received during site characterization. To overcome this, an incentive program to encourage community acceptance has been approved by the Government. Programs for community promotion are being proposed and negotiations are also underway. (authors)« less

  19. Mesoscale Design of Magnetoelectric Nanocomposites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Viehland, Dwight; Priya, Shashank

    This is a final report for a transient program that was issued to Virginia Tech as a new program (DE-SC0001450), rather than as a renewal to our existing program (DE-FG02-06ER46290). The renewal proposal was submitted in November 2014, but because of confusion in the negotiations got issued as a new program. Subsequently, a correction was made where the new program (DE-SC0001450) was terminated, and a renewal to the existing program (DE-FG02-06ER46290) issued. About $8,000 was expended on the new program before the mistake was discovered, and actions begun to correct it. The Department of Materials Science and Engineering at Virginiamore » Tech issued a ‘Letter of Guarantee’ to the University to continue work while the issues were sorted out. The renewal proposal (DE-FG02-06ER46290) that was eventually funded was the same one as the new proposal (DE-SC0001450) that was initially funded. The $8,000 expended on the new proposal was subtracted from the eventual amount given in the renewal proposal. Here, we submit the final report for this new program (DE-SC0001450) that was terminated. Since the Statement of Work was identical to the renewal proposal (DE-FG02-06ER46290), we submit to you as the final report for the new program (DE-SC0001450) the same information that we submitted as our annual report for DE-FG02-06ER46290 that was submitted to the program manager (Refik Kortan) in June 2016.« less

  20. The development and preliminary effectiveness of a nursing case management e-learning program.

    PubMed

    Liu, Wen-I; Chu, Kuo-Chung; Chen, Shing-Chia

    2014-07-01

    The purpose of this article was to describe the development and preliminary effectiveness of a digital case management education program. The e-learning program was built through the collaboration of a nurse educator and an informatics professor. The program was then developed according to the following steps: (1) building a visual interface, (2) scripting each unit, (3) preparing the course material and assessment tests, (4) using teaching software to record audio and video courses, (5) editing the audio recordings, (6) using instructional media or hyperlinks to finalize the interactions, (7) creating the assessment and obtaining feedback, and (8) testing the overall operation. The digital program consisted of five learning modules, self-assessment questions, learning cases, sharing experiences, and learning resources. Forty nurses participated in this study and fully completed the questionnaires both before and after the program. The knowledge and confidence levels in the experimental group were significantly higher over time than those of the comparison group. The results supported the use of educational technology to provide a more flexible and effective presentation method for continuing education programs.

  1. 77 FR 34229 - Idaho: Final Authorization of State Hazardous Waste Management Program; Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... capability for the disposal of remote-handled low-level radioactive waste ((LLW) generated at the Idaho... (FONSI), for the Remote-Handled Low-Level Radioactive Waste Onsite Disposal (RHLLWOD) on an Environmental... regulating phosphate (mineral processing) plants within the state. In response to this commenter's concerns...

  2. 76 FR 18927 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    .../Tribal Oversight Section (6PD-O), Multimedia Planning and Permitting Division, EPA Region 6, 1445 Ross... and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas, Texas 75202-2733. Instructions: Do... Ross Avenue, Dallas, Texas 75202-2733, phone number (214) 665-8533. Interested persons wanting to...

  3. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-15

    .../Tribal Oversight Section (6PD-O), Multimedia Planning and Permitting Division, EPA Region 6, 1445 Ross... and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas, Texas 75202-2733. Instructions: Do... Ross Avenue, Dallas, Texas 75202-2733, phone number (214) 665-8533. Interested persons wanting to...

  4. 77 FR 47779 - Arkansas: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... Ross Avenue, Dallas, Texas 75202-2733. 4. Hand Delivery or Courier: Deliver your comments to Alima... Planning and Permitting Division, EPA Region 6, 1445 Ross Avenue, Dallas, Texas 75202-2733. Instructions... Ross Avenue, Dallas, Texas 75202-2733, phone number (214) 665-8533. Interested persons wanting to...

  5. Retrodirective Radar Calibration Nanosatellite

    DTIC Science & Technology

    2013-07-01

    Martin (Student Program Manager); Nicholas G. Fisher (Student Systems Engineer) University of Hawaii JULY 2013 Final Report...Cost-Effective, Rapid Design of a Student-Built Radar Calibration Nanosatellite Larry K. Martin , Nicholas G. Fisher, Toy Lim, John...University of Hawaii Reinventing Space Conference AIAA-RS-2012-3001 Martin 1 AIAA Reinventing Space Conference 2012

  6. 78 FR 54178 - Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ...] Perform inspections, and require monitoring, tests, analyses or reports; [cir] Enforce RCRA requirements... (revision Federal Register Analogous Virginia checklists \\1\\) authority RCRA Cluster XVII Hazardous Waste... Cluster XVIII Regulation of Oil-Bearing 73 FR 57, January 9 VAC Sec. Sec. 20- Hazardous Secondary...

  7. The PISA Project: A Final Report.

    ERIC Educational Resources Information Center

    Buhler-Miko, Marina

    With the support of a 3-year grant from the Fund for The Improvement of Postsecondary Education (FIPSE), the Higher Education Strategic Planning Institute has built a shared experience strategic planning database for college and university top-level management. The Performance Improvement through Strategy Analysis (PISA) program began in 1982 with…

  8. Energy Education As We Leave It. Final Report.

    ERIC Educational Resources Information Center

    Education Commission of the States, Denver, CO.

    Since 1978, the Education Commission of the States has worked closely with the U.S. Department of Energy to: collect/disseminate information regarding federal, state, and local energy education/conservation activities; assist states in developing/implementing both energy education and school energy management policies and programs; and better…

  9. 75 FR 35660 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... copyrighted material, is not placed on the Internet and will be publicly available only in hard copy form... hard copy at the following two locations: (i) Massachusetts Department of Environmental Protection...: dredged material exemption at 40 CFR 261.4(g)--State: formatting corrections to previously authorized...

  10. Information Resources Management Skills for Academic Librarians: Final Report.

    ERIC Educational Resources Information Center

    McClure, Charles R.; And Others

    This report summarizes activities conducted from fall 1984 through spring 1985, under a planning grant from the Council on Library Resources for Innovation and Improvement of Basic and Supplementary Education for Academic and Research Libraries. The report includes a review of selected literature related to educational programs for academic…

  11. 7 CFR 1710.115 - Final maturity.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... maturities for loans for the implementation of programs for demand side management and energy resource conservation and on and off grid renewable energy sources not owned by the borrower will be determined by RUS... finance working capital required for the initial operation of a new system are a separate class of loans...

  12. 40 CFR 272.201 - Arkansas State-administered program: Final authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Arkansas Pollution Control and Ecology (APC&E) Commission Regulation No. 23, Hazardous Waste Management, as... Three, Sections 19 and 21, 22; Chapter Five, Section 28. (x) Arkansas Pollution Control and Ecology (APC... Ecology (APC&E) Commission, Regulation No. 8, Administrative Procedures, June 12, 2000. (3) The following...

  13. Enhancing extension recommendations to maximize efficacy of spray programs for the Georgia DOT : final report.

    DOT National Transportation Integrated Search

    2015-12-23

    Research was conducted to evaluate equipment, adjuvants, and water quality used by the : Georgia DOT on herbicide efficacy for roadside management. From 19 DOT stations, 68% had alkaline : (7.1 to 7.9) water, 32% had hard water (>120 ppm), and 10% ha...

  14. The Vermont Guide for Teaching Adolescents with Special Needs. Final Report.

    ERIC Educational Resources Information Center

    Halloran, William E., Comp.; And Others

    Presented for classroom teachers, program supervisors, and resource specialists is a curriculum guide in the areas of home management and career preparation for adolescents with special needs. Introductory information includes explanations of the format and use of the guide and suggestions for evaluating student performance. Guidelines provided…

  15. Instructional Support Software System. Final Report.

    ERIC Educational Resources Information Center

    McDonnell Douglas Astronautics Co. - East, St. Louis, MO.

    This report describes the development of the Instructional Support System (ISS), a large-scale, computer-based training system that supports both computer-assisted instruction and computer-managed instruction. Written in the Ada programming language, the ISS software package is designed to be machine independent. It is also grouped into functional…

  16. Congressional Testimony on School Violence: Early Childhood, Youth and Families Subcommittee.

    ERIC Educational Resources Information Center

    Poland, Scott

    1998-01-01

    School violence has been linked to youth not recognizing the finality of death, extreme violence portrayed in the media, availability of guns, student reluctance to "tell," and lack of curriculum that teaches children anger management and problem-solving skills. Recommendations include making prevention programs a priority and…

  17. Data management and language enhancement for generalized set theory computer language for operation of large relational databases

    NASA Technical Reports Server (NTRS)

    Finley, Gail T.

    1988-01-01

    This report covers the study of the relational database implementation in the NASCAD computer program system. The existing system is used primarily for computer aided design. Attention is also directed to a hidden-surface algorithm for final drawing output.

  18. Passenger Transportation and Travel Curriculum Guide. Final Report.

    ERIC Educational Resources Information Center

    Lininger, Carol

    This curriculum guide provides materials for a course in passenger transportation and travel. The four-credit, competency-based program provides students with skills necessary to obtain employment in the aviation industry, travel agencies, hotel/motel management, and car rental agencies. An overview of vocational-technical education at the school…

  19. Guide to Software Conversion Management. [Final Report.

    ERIC Educational Resources Information Center

    Skall, M., Ed.

    Based mainly on interviews conducted at 14 federal agencies that had completed or were involved in software conversion projects, this publication provides guidelines for the entire process of software conversion. This is defined as the transformation, without functional change, of computer programs or data elements to permit their use on a…

  20. A methodology for producing reliable software, volume 1

    NASA Technical Reports Server (NTRS)

    Stucki, L. G.; Moranda, P. B.; Foshee, G.; Kirchoff, M.; Omre, R.

    1976-01-01

    An investigation into the areas having an impact on producing reliable software including automated verification tools, software modeling, testing techniques, structured programming, and management techniques is presented. This final report contains the results of this investigation, analysis of each technique, and the definition of a methodology for producing reliable software.

  1. 40 CFR 272.201 - Arkansas State-administered program: Final authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Arkansas Pollution Control and Ecology (APC&E) Commission Regulation No. 23, Hazardous Waste Management, as... Three, Sections 19 and 21, 22; Chapter Five, Section 28. (x) Arkansas Pollution Control and Ecology (APC... Ecology (APC&E) Commission, Regulation No. 8, Administrative Procedures, June 12, 2000. (3) The following...

  2. 40 CFR 272.201 - Arkansas State-administered program: Final authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Arkansas Pollution Control and Ecology (APC&E) Commission Regulation No. 23, Hazardous Waste Management, as... Three, Sections 19 and 21, 22; Chapter Five, Section 28. (x) Arkansas Pollution Control and Ecology (APC... Ecology (APC&E) Commission, Regulation No. 8, Administrative Procedures, June 12, 2000. (3) The following...

  3. 40 CFR 272.201 - Arkansas State-administered program: Final authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Arkansas Pollution Control and Ecology (APC&E) Commission Regulation No. 23, Hazardous Waste Management, as... Three, Sections 19 and 21, 22; Chapter Five, Section 28. (x) Arkansas Pollution Control and Ecology (APC... Ecology (APC&E) Commission, Regulation No. 8, Administrative Procedures, June 12, 2000. (3) The following...

  4. 1984 Directory of Experts on Organization and Management of Construction.

    DTIC Science & Technology

    1984-02-01

    Action & Services Expert on the Panal of: World Bank, Asian Development Bank, Commonwealth Fund for Technical Cooneration, U.N. Centre for Human...Hall, Inc., Englewood Cliffs, New Jersey, 1977 Nunnally, S. W., and R. F. DeBruhl, Final Report, North Carolina Home Builders Passive Solar Program

  5. Asset Management Plan: 1998-2003.

    ERIC Educational Resources Information Center

    Jefferson County School District R-1, Denver, CO.

    The Jefferson County School District (Denver, Colorado) presents its final scheduling and funding source information for the 1998-2003 capital improvement program and the status of the 1992-1997 completed capital improvement project costs compared to the budget. Funding data are detailed for each of the district's 182 public schools, special use…

  6. Feasibility of Helicopter Support Seek Frost.

    DTIC Science & Technology

    1980-05-01

    the allowable maximum weight can be used as the payload. The payload is a variable. Small helicopters with full fuel and auxillary tanks can fly...equipment, that the program to obtain icing approval on the S-76 will be finalized for management evaluation, and a decision can be made at that time to

  7. State-local policy management project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-08-01

    The report describes case studies to explore new approaches for increasing state and local coordination in planning and managing programs in areas with significant scientific and technical components such as energy and environment. Specifically, the case studies reveal efforts of various states in the areas of energy conservation, weatherization, emergency preparedness, and air quality. Successes and failures of Maryland's decentralized approach to energy conservation are documented; success of the thermal and lighting efficiency standards program in Texas is discussed; state aid for local energy conservation programs in Clinton County, Michigan, is reviewed; and the success of the weatherization program inmore » Oregon is examined. Pilot programs in weatherization in Pennsylvania are shown to have led a statewide effort. Two Minnesota projects in emergency preparedness are documented and factors for success are listed. In addition, long-range planning for fuel shortages in New York is examined and the benefits of regional planning in Fairfax County, Virgina, are noted. Efforts are examined to improve air quality in Ohio, California, and New Jersey.« less

  8. Final Environmental Assessment for the Airfield Safety Zone Vegetation Clearing at Joint Base McGuire-Dix-Lakehurst

    DTIC Science & Technology

    2011-10-01

    JBMDL’s flying mission. Installation Restoration Program (IRP), Hazardous Materials and Waste Management There are several IRP sites within the...McGuire airfield area; however, none are expected to impact the Proposed Action. Negligible impacts on hazardous materials management during tree clearing...would be expected as only minor quantities of hazardous materials are likely to be used. BMPs would be followed to minimize the possibility of a

  9. Hydrological Monitoring System Design and Implementation Based on IOT

    NASA Astrophysics Data System (ADS)

    Han, Kun; Zhang, Dacheng; Bo, Jingyi; Zhang, Zhiguang

    In this article, an embedded system development platform based on GSM communication is proposed. Through its application in hydrology monitoring management, the author makes discussion about communication reliability and lightning protection, suggests detail solutions, and also analyzes design and realization of upper computer software. Finally, communication program is given. Hydrology monitoring system from wireless communication network is a typical practical application of embedded system, which has realized intelligence, modernization, high-efficiency and networking of hydrology monitoring management.

  10. Report on the Audit of Foreign Military Sales Trust Fund Disbursement Reporting

    DTIC Science & Technology

    1991-09-11

    This is our final report on the Audit of Foreign Military Sales Trust Fund Disbursement Reporting, provided for your information and use. The audit was...made from August 1990 through March 1991. The overall objective of the audit was to determine whether disbursements from the Foreign Military Sales...implementation of the internal management control program required by the Federal Managers’ Financial Integrity Act (FMFIA) as it pertained to the audit objectives.

  11. Jefferson Proving Ground, South of the Fining Line, Final Remedial Investigation/Feasibility Study, Resource Management Plan

    DTIC Science & Technology

    1993-01-01

    and various DOD sites. I From 1984 to 1987, Mr. Pincock was a Certified Radiation and Chemistry Technician for United Nuclear Industries. He performed...in 1983, Mr. Pincock assisted the senior technical staff in radiation protection as a Junior Health Physics Technician at the Nuclear Support Services...SCOPE OF PROGRAM This plan contains a description of the personnel and procedures for managing the Remedial Investigation/Feasibility Study (RI/FS) at

  12. Condensed Matter Physics at ONR - A Nanoelectronics Perspective

    NASA Astrophysics Data System (ADS)

    Baatar, Chagaan

    As a mission agency within the Department of Defense, the Office of Naval Research (ONR) currently does not have a program exclusively dedicated to condensed matter physics (CMP) research. Yet many CMP related topics are being funded under various programs scattered throughout the agency. In this talk I will provide an example of such a program - the ONR Nanoelectronics program, that I currently manage, and highlight some of the CMP related activities within the program. I may also mention a few topics that are funded by other ONR program officers. Finally, in addressing the theme of the session, I will describe the ONR Young Investigator Program (YIP) - its brief history, solicitation and evaluation processes involved, and provide a few examples from recent YIP projects.

  13. Development and validation of a questionnaire to evaluate patient satisfaction with diabetes disease management.

    PubMed

    Paddock, L E; Veloski, J; Chatterton, M L; Gevirtz, F O; Nash, D B

    2000-07-01

    To develop a reliable and valid questionnaire to measure patient satisfaction with diabetes disease management programs. Questions related to structure, process, and outcomes were categorized into 14 domains defining the essential elements of diabetes disease management. Health professionals confirmed the content validity. Face validity was established by a patient focus group. The questionnaire was mailed to 711 patients with diabetes who participated in a disease management program. To reduce the number of questionnaire items, a principal components analysis was performed using a varimax rotation. The Scree test was used to select significant components. To further assess reliability and validity; Cronbach's alpha and product-moment correlations were calculated for components having > or =3 items with loadings >0.50. The validated 73-item mailed satisfaction survey had a 34.1% response rate. Principal components analysis yielded 13 components with eigenvalues > 1.0. The Scree test proposed a 6-component solution (39 items), which explained 59% of the total variation. Internal consistency reliabilities computed for the first 6 components (alpha = 0.79-0.95) were acceptable. The final questionnaire, the Diabetes Management Evaluation Tool (DMET), was designed to assess patient satisfaction with diabetes disease management programs. Although more extensive testing of the questionnaire is appropriate, preliminary reliability and validity of the DMET has been demonstrated.

  14. Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan

    DTIC Science & Technology

    1989-08-30

    QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific

  15. Influencing Nursing Knowledge and Attitudes to Positively Affect Care of Patients with Persistent Pain in the Hospital Setting.

    PubMed

    Keen, Alyson; McCrate, Brian; McLennon, Susan; Ellis, Alexis; Wall, Donna; Jones, Sarah

    2017-06-01

    Hospitalized patients with persistent pain are among the most challenging populations to effectively manage because of coexistence with acute pain. Nurses play a vital role in pain management; however, gaps in knowledge and detrimental attitudes exist. The purpose of this study was to evaluate the effectiveness of a targeted evidence-based pain education program to increase nurses' knowledge and attitudes about pain management. One group, paired, pretest/posttest educational intervention. A convenience sample of nurses from three medical and surgical inpatient units were recruited. Participants completed a pretest, the Knowledge and Attitudes Survey Regarding Pain Scale, to assess education needs. Identified gaps were targeted during program design. The program consisted of two 30-minute interactive educational sessions approximately 1 month apart. The first session, delivered by a pharmacist, covered pharmacology and pathophysiology content. The second session, delivered by trained registered nurses, used case studies paired with video scenarios. A total of 51 nurses completed the pretest. The final sample consisted of 24 nurses who completed both the pretest and posttest. The mean age was 30 years; 88% were female, and 92% were baccalaureate prepared. Paired t tests indicated higher posttest total scores (p < .001) after the education program compared with pretest scores. Overall program satisfaction was positive. This study found improvement in persistent pain management knowledge and attitudes among direct care nurses caring for hospitalized patients. A targeted educational program may be an effective and efficient delivery method. Copyright © 2017 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  16. Diagnosis and Management of Fetal Growth Restriction

    PubMed Central

    Bamfo, Jacqueline E. A. K.; Odibo, Anthony O.

    2011-01-01

    Fetal growth restriction (FGR) remains a leading contributor to perinatal mortality and morbidity and metabolic syndrome in later life. Recent advances in ultrasound and Doppler have elucidated several mechanisms in the evolution of the disease. However, consistent classification and characterization regarding the severity of FGR is lacking. There is no cure, and management is reliant on a structured antenatal surveillance program with timely intervention. Hitherto, the time to deliver is an enigma. In this paper, the challenges in the diagnosis and management of FGR are discussed. The biophysical profile, Doppler, biochemical and molecular technologies that may refine management are reviewed. Finally, a model pathway for the clinical management of pregnancies complicated by FGR is presented. PMID:21547092

  17. 76 FR 28944 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ...EPA is proposing a limited approval and limited disapproval of permitting rules submitted for the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP). The districts are required under Part D of title I of the Clean Air Act (CAA) to adopt and implement a SIP-approved New Source Review (NSR) permit program. These rules update and revise the District's NSR permitting program for new and modified sources of air pollution. If EPA finalizes the limited approval and limited disapproval action, as proposed, then a sanctions clock would be triggered. We are taking comments on this proposal and plan to follow with a final action.

  18. Medicare Disease Management in Policy Context

    PubMed Central

    Linden, Ariel; Adler-Milstein, Julia

    2008-01-01

    Interim results of the Medicare health support (MHS) demonstration projects suggest that commercial disease management (DM) is unable to deliver short-term medical cost savings. This is not surprising given the current DM program focus on compliance with process measures that may only lead to cost savings in the long term. A program focused on reducing near-term hospitalizations is more likely to deliver savings during the initial 3-year phase of MHS. If the early trends in MHS are indicative of the final results, CMS will face the decision of whether to abandon commercial DM in favor of other chronic care management strategies. This article supports the upcoming assessment by describing the characteristics of the current commercial DM model that limit its ability to deliver short-term medical cost savings and the changes required to overcome these limitations. PMID:18567239

  19. ALARA implementation throughout project life cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haynes, M.J.

    1995-03-01

    A strength of radiation protection programs generally has been endorsement and application of the ALARA principle. In Ontario Hydro, which currently operates 20 commercial size nuclear units, great strides have been made in the last three decades in reducing occupational radiation exposure per unit of electricity generated. This paper will discuss specific applications of elements of the overall ALARA program which have most contributed to dose reduction as the nuclear program has expanded. This includes such things as management commitment, ALARA application in the design phase and major rehabilitation work, the benefits of the self protection concept, a specific examplemore » of elimination (or reduction) of the source term and the importance of dose targets. Finally, it is concluded that the major opportunities for further improvements may lie in the area of information management.« less

  20. International Piping Integrity Research Group (IPIRG) Program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkowski, G.; Schmidt, R.; Scott, P.

    1997-06-01

    This is the final report of the International Piping Integrity Research Group (IPIRG) Program. The IPIRG Program was an international group program managed by the U.S. Nuclear Regulatory Commission and funded by a consortium of organizations from nine nations: Canada, France, Italy, Japan, Sweden, Switzerland, Taiwan, the United Kingdom, and the United States. The program objective was to develop data needed to verify engineering methods for assessing the integrity of circumferentially-cracked nuclear power plant piping. The primary focus was an experimental task that investigated the behavior of circumferentially flawed piping systems subjected to high-rate loadings typical of seismic events. Tomore » accomplish these objectives a pipe system fabricated as an expansion loop with over 30 meters of 16-inch diameter pipe and five long radius elbows was constructed. Five dynamic, cyclic, flawed piping experiments were conducted using this facility. This report: (1) provides background information on leak-before-break and flaw evaluation procedures for piping, (2) summarizes technical results of the program, (3) gives a relatively detailed assessment of the results from the pipe fracture experiments and complementary analyses, and (4) summarizes advances in the state-of-the-art of pipe fracture technology resulting from the IPIRG program.« less

Top