Sample records for management system evms

  1. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  2. Improved cost monitoring and control through the Earned Value Management System

    NASA Astrophysics Data System (ADS)

    Hunter, Howard; Fitzgerald, Richard; Barlow, Dewey

    2014-01-01

    As economic pressure and competition for budget among federal agencies has increased, there has been an increasing need for more granular data and robust management information systems. This is especially true for the execution of major civilian space programs. This need has resulted in new program management requirements being implemented in an attempt to limit cost and schedule growth. In particular, NASA Procedural Requirements (NPR) 7120.5D requires the implementation of an Earned Value Management System (EVMS) compliant with the requirements of American National Standards Institute (ANSI)/Electronic Industries Alliance Standard 748-B. The Radiation Belt Storm Probes (RBSP) program management team at The Johns Hopkins University Applied Physics Laboratory (JHU/APL) made a decision to implement an EVMS on RBSP during Phase B—a year earlier than specified in the contractual Phase C reporting requirement as defined in the NPR. This decision was made so that the project would have the benefit of 12 months of training and hands-on implementation during Phase B. Although there were a number of technical and process hurdles encountered during Phase B and into Phase C, the system was working well when the Integrated Baseline Review (IBR) was held in August 2009. The IBR was a success because it met the review requirements. It was also clear to all IBR participants that the EVMS was providing value to the project management team. Although the IBR pointed out some areas of concern regarding process and ANSI compliance, the system had markedly improved the project's ability to monitor cost and schedule. This, in turn, allowed the project team to foresee problems in advance, formulate corrective actions, and implement course corrections without causing significant adverse impact to the project. Opponents of EVMS systems often communicate the unfavorable opinion that EVMS systems create unnecessary cost and administration. Although it is undeniable that EVMS implementation does not occur without cost, the cost is minimal in comparison to the benefits of successful implementation. This paper will focus on the implementation of EVMS on the RBSP project, explain EV processes and the implementation's cost, and analyze the benefits of EVMS to provide insight into cost/benefit considerations for other projects considering EVMS implementation. This paper will do this by focusing on the following points: (1) RBSP is the first full-up implementation of earned value management (EVM) at JHU/APL; (2) RBSP EVM started in Phase B; (3) RBSP EVM implementation has been working well in Phase C/D; (4) RBSP EVM implementation has been recognized by Goddard Space Flight Center and NASA Headquarters as successful; and (5) an assessment of the benefits of EVMS to the project management team and sponsor shows that the system's benefits outweigh the cost of implementation.

  3. NASA Earned Value Management (EVM) Update

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald

    2013-01-01

    Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.

  4. Results of a NASA Kennedy Space Center Earned Value Management Pilot Project

    NASA Technical Reports Server (NTRS)

    Delgado, Hector N.; Rhodeside, Glenn R.

    2004-01-01

    The Earn Value Management Pilot provided a tremendous amount of data on the strengths and weaknesses of the new financial system, the ability to support EVM from many viewpoints, the lack of tools for small to medium projects implementing EVM, and the training and environment necessary to successfully deploy EVM to all projects. This data along with other pilots will prove invaluable. Deploying EVM should not be taken lightly - a full assessment of capabilities and supporting infrastructure should be done prior to any deployment, and some very basic questions should be asked. For instance, will sufficient training be provided? Can the project managers readily and easily obtain all the necessary data? If EVM is to thrive in all projects regardless of cost, the transition should be as seamless as possible, minimizing cost and effort, and with the end user in mind. In setting up an EVM implementation, the question, "How does the project manager benefit from this process?" must remain at the forefront. Further research in this area is needed to answer the question,"Is EVM cost effective in small projects?" The authors welcome knowledge sharing with other organizations that are striving to gain the benefits of EVM on small projects.

  5. De-mystifying earned value management for ground based astronomy projects, large and small

    NASA Astrophysics Data System (ADS)

    Norton, Timothy; Brennan, Patricia; Mueller, Mark

    2014-08-01

    The scale and complexity of today's ground based astronomy projects have justifiably required Principal Investigator's and their project teams to adopt more disciplined management processes and tools in order to achieve timely and accurate quantification of the progress and relative health of their projects. Earned Value Management (EVM) is one such tool. Developed decades ago and used extensively in the defense and construction industries, and now a requirement of NASA projects greater than $20M; EVM has gained a foothold in ground-based astronomy projects. The intent of this paper is to de-mystify EVM by discussing the fundamentals of project management, explaining how EVM fits with existing principles, and describing key concepts every project can use to implement their own EVM system. This paper also discusses pitfalls to avoid during implementation and obstacles to its success. The authors report on their organization's most recent experience implementing EVM for the GMT-Consortium Large Earth Finder (G-CLEF) project. G-CLEF is a fiber-fed, optical echelle spectrograph that has been selected as a first light instrument for the Giant Magellan Telescope (GMT), planned for construction at the Las Campanas Observatory in Chile's Atacama Desert region.

  6. 48 CFR 1334.201-70 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... criticality, or risk potential. (b) If a project manager considers the use of an EVMS to be necessary for a... the Department's Information Technology Investment Performance Measurement and Performance Reporting Policy, the use of an Earned Value Management System (EVMS) is required for major acquisitions for...

  7. Earned Value Management Considering Technical Readiness Level and Its Application to New Space Launcher Program

    NASA Astrophysics Data System (ADS)

    Choi, Young-In; Ahn, Jaemyung

    2018-04-01

    Earned value management (EVM) is a methodology for monitoring and controlling the performance of a project based on a comparison between planned and actual cost/schedule. This study proposes a concept of hybrid earned value management (H-EVM) that integrates the traditional EVM metrics with information on the technology readiness level. The proposed concept can reflect the progress of a project in a sensitive way and provides short-term perspective complementary to the traditional EVM metrics. A two-dimensional visualization on the cost/schedule status of a project reflecting both of the traditional EVM (long-term perspective) and the proposed H-EVM (short-term perspective) indices is introduced. A case study on the management of a new space launch vehicle development program is conducted to demonstrate the effectiveness of the proposed H-EVM concept, associated metrics, and the visualization technique.

  8. Deficient Contractor Business Systems: Applying the Value at Risk (VAR) Model to Earned Value Management Systems

    DTIC Science & Technology

    2013-06-01

    measuring numerical risk to the government ( Galway , 2004). However, quantitative risk analysis is rarely utilized in DoD acquisition programs because the...quantitative assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost...Kindle version]. Retrieved from Amazon.com 83 Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review

  9. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Federal Agency (CFA) as being compliant with the guidelines in ANSI/EIA Standard-748 (current version at... and accepted by the CFA at the time of award, see paragraph (b) of this clause. The Contractor shall..., the Contractor's EVM system has not been validated and accepted by the CFA as complying with EVMS...

  10. Deficient Contractor Business Systems: Applying the Value at Risk (VaR) Model to Earned Value Management Systems

    DTIC Science & Technology

    2013-06-30

    QUANTITATIVE RISK ANALYSIS The use of quantitative cost risk analysis tools can be valuable in measuring numerical risk to the government ( Galway , 2004...assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost, schedule, and...www.amazon.com Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review (RAND Working Paper WR-112-RC

  11. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  12. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    Terrell, Stefanie M.; Richards, Brad W.

    2018-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  13. Civilian Agency Industry Working Group EVM World Update

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald

    2013-01-01

    Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.

  14. 48 CFR 1034.201 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.201 Policy. (a) (1) An Earned Value Management System (EVMS) is required for major acquisitions for development/modernization/enhancement (DME..., Earned Value Management System; and, as appropriate, 1052.234-4, Earned Value Management System Alternate...

  15. 48 CFR 1034.201 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.201 Policy. (a) (1) An Earned Value Management System (EVMS) is required for major acquisitions for development/modernization/enhancement (DME..., Earned Value Management System; and, as appropriate, 1052.234-4, Earned Value Management System Alternate...

  16. 48 CFR 1034.201 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.201 Policy. (a) (1) An Earned Value Management System (EVMS) is required for major acquisitions for development/modernization/enhancement (DME..., Earned Value Management System; and, as appropriate, 1052.234-4, Earned Value Management System Alternate...

  17. Defense AT and L Magazine. Vol. 46, no. 2, March-April 2017

    DTIC Science & Technology

    2017-03-01

    Regulation Supplement, system and reporting) are placed within the solicitation. Once under contract, PARCA has a new issue resolution ( IR ) pro- cess...PARCA has a new issue resolution ( IR ) process that has helped contractors interpret the expectations of the EIA-748 EVMS standard guidelines and EVM...interpretive guide which better clarified the requirements for an earned value management system. Through industry outreach and Web -based clearinghouse

  18. Thoughts on Earned Value Assessments

    NASA Technical Reports Server (NTRS)

    Pido, Kelle

    2009-01-01

    This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

  19. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  20. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  1. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (MAY 2014) (a) The Contractor shall use an earned value management system (EVMS...

  2. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  3. 48 CFR 52.234-4 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Earned Value Management....234-4 Earned Value Management System. As prescribed in 34.203(c), insert the following clause: Earned Value Management System (JUL 2006) (a) The Contractor shall use an earned value management system (EVMS...

  4. 75 FR 75549 - Defense Federal Acquisition Regulation Supplement; Business Systems-Definition and Administration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-03

    ... systems as accounting systems, estimating systems, purchasing systems, earned value management systems (EVMS), material management and accounting systems (MMAS), and property management systems. 2. DoD is... percent. 2. Accounting System Comment: A number of respondents expressed concern about the criteria to be...

  5. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  6. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  7. 48 CFR 1052.234-72 - Core Earned Value Management System AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System AUG 2011 1052.234-72 Section 1052.234-72 Federal Acquisition Regulations System DEPARTMENT... and Clauses 1052.234-72 Core Earned Value Management System AUG 2011 As prescribed in DTAR 1034.203... an earned value management system (EVMS). (a) The Contractor shall use an earned value management...

  8. 48 CFR 334.201 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 334.201 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 334.201 Policy. (a) For acquisitions for... Earned Value Management System (EVMS) is required as follows: (1) For individual cost-reimbursement or...

  9. 48 CFR 334.201 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 334.201 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 334.201 Policy. (a) For acquisitions for... Earned Value Management System (EVMS) is required as follows: (1) For individual cost-reimbursement or...

  10. 48 CFR 334.201 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 334.201 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 334.201 Policy. (a) For acquisitions for... Earned Value Management System (EVMS) is required as follows: (1) For individual cost-reimbursement or...

  11. 48 CFR 334.201 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 334.201 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 334.201 Policy. (a) For acquisitions for... Earned Value Management System (EVMS) is required as follows: (1) For individual cost-reimbursement or...

  12. Procedures to Help Program Offices with Earned Value Management

    EPA Pesticide Factsheets

    EPA’s Earned Value Management (EVM) Procedures describe the Agency methods for collecting and reporting performance information on major IT investments. The EVM Procedures explain how EPA Program Offices are to receive, organize, analyze, and report cost.

  13. 48 CFR 1034.201 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.201 Policy. (a) (1) An Earned Value Management System (EVMS) is required for major acquisitions for development/modernization/enhancement (DME... certified; and (4) Whether a Full Integrated Baseline Review (IBR) will be completed within 90 days when the...

  14. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  15. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  16. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  17. 48 CFR 1052.234-71 - Notice of Earned Value Management System-Post-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System-Post-Award IBR (Core) AUG 2011 1052.234-71 Section 1052.234-71 Federal Acquisition... Texts of Provisions and Clauses 1052.234-71 Notice of Earned Value Management System—Post-Award IBR... require the contractor to use an earned value management system (EVMS) and for which the Government...

  18. 48 CFR 34.203 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.203... substantially the same as the provision at FAR 52.234-2, Notice of Earned Value Management System - Pre-Award... System (EVMS) and for which the Government requires an Integrated Baseline Review (IBR) prior to award...

  19. 48 CFR 34.203 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.203... substantially the same as the provision at FAR 52.234-2, Notice of Earned Value Management System - Pre-Award... System (EVMS) and for which the Government requires an Integrated Baseline Review (IBR) prior to award...

  20. 48 CFR 34.203 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.203... substantially the same as the provision at FAR 52.234-2, Notice of Earned Value Management System - Pre-Award... System (EVMS) and for which the Government requires an Integrated Baseline Review (IBR) prior to award...

  1. 48 CFR 34.203 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.203... substantially the same as the provision at FAR 52.234-2, Notice of Earned Value Management System - Pre-Award... System (EVMS) and for which the Government requires an Integrated Baseline Review (IBR) prior to award...

  2. 48 CFR 34.203 - Solicitation provisions and contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATION SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 34.203... substantially the same as the provision at FAR 52.234-2, Notice of Earned Value Management System - Pre-Award... System (EVMS) and for which the Government requires an Integrated Baseline Review (IBR) prior to award...

  3. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  4. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  5. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  6. 48 CFR 1052.234-70 - Notice of Earned Value Management System-Pre-Award IBR (Core) AUG 2011

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System-Pre-Award IBR (Core) AUG 2011 1052.234-70 Section 1052.234-70 Federal Acquisition... Texts of Provisions and Clauses 1052.234-70 Notice of Earned Value Management System—Pre-Award IBR (Core... require the Contractor to use an earned value management system (EVMS) and for which the Government...

  7. Comparing the Predictive Capabilities of Level Three EVM Cost Data with Level Five EVM Cost Data

    DTIC Science & Technology

    2014-03-27

    Management (EVM) Data Manual , 2008). Performance Assessments and Root Cause Analysis (PARCA) directly oversees EVM- CR. A contractor must submit seven...Massive Ordance Penetrator (F33657-99-D-0028) 126 66 17 9 7 Chem Demil - CMA (DAAA09-97-C-0025) 2494 1520 63 19 9 Chem Demil - CMA (DACA87-89-C-0076) 441...Engagement Capability N00024-05-C-5100 1 50 Army Chem Demil - CMA DACA87-89-C-0076 0 1 Army Chem Demil - CMA DAAA09-97-C-0025 1 2 Navy DDG 1000 - ZUMWALT

  8. 48 CFR 252.234-7001 - Notice of Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... documentation that the Cognizant Federal Agency (CFA) has determined that the proposed Earned Value Management... compliance with ANSI/EIA-748. (2) If the offeror proposes to use an EVMS that has been determined by the CFA...

  9. 48 CFR 334.203-70 - HHS solicitation provisions and contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provisions and contract clauses. 334.203-70 Section 334.203-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management... Value Management System—Pre-Award IBR, in solicitations that will require the contractor to use an EVMS...

  10. 48 CFR 334.203-70 - HHS solicitation provisions and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provisions and contract clauses. 334.203-70 Section 334.203-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management... Value Management System—Pre-Award IBR, in solicitations that will require the contractor to use an EVMS...

  11. 48 CFR 334.203-70 - HHS solicitation provisions and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provisions and contract clauses. 334.203-70 Section 334.203-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management... Value Management System—Pre-Award IBR, in solicitations that will require the contractor to use an EVMS...

  12. 48 CFR 334.203-70 - HHS solicitation provisions and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provisions and contract clauses. 334.203-70 Section 334.203-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management... Value Management System—Pre-Award IBR, in solicitations that will require the contractor to use an EVMS...

  13. 48 CFR 334.203-70 - HHS solicitation provisions and contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provisions and contract clauses. 334.203-70 Section 334.203-70 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management... Value Management System—Pre-Award IBR, in solicitations that will require the contractor to use an EVMS...

  14. World Record Earned Value Management System Certification for Cleanup of the East Tennessee Technology Park, Oak Ridge, Tennessee, USA - 13181

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haynes, Ray; Hirschy, Anita

    On projects that require Earned Value Management (EVMS) Certification, it is critical to quickly prepare for and then successfully obtain certification. This is especially true for government contracts. Projects that do poorly during the review are subject to financial penalties to their company and they lose creditability with their customer creating problems with the project at the outset. At East Tennessee Technology Park (ETTP), we began preparing for Department of Energy (DOE) certification early during proposal development. Once the contract was awarded, while still in transition phase from the previous contractor to our new company, we immediately began reviewing themore » project controls systems that were in place on the project and determined if any replacements needed to be made immediately. The ETTP contract required the scheduling software to be upgraded to Primavera P6 and we determined that no other software changes would be done prior to certification. Next, preparation of the Project Controls System Description (PCSD) and associated procedures began using corporate standards as related to the project controls systems. During the transition phase, development was started on the Performance Measurement Baseline which is the resource loaded schedule used to measure our performance on the project and which is critical to good Earned Value Management of the project. Early on, and throughout the baseline review, there was positive feedback from the Department of Energy that the quality of the new baseline was good. Having this superior baseline also contributed to our success in EVMS certification. The combined companies of URS and CH2M Hill had recent experience with certifications at other Department of Energy sites and we were able to capitalize on that knowledge and experience. Generic PCSD and procedures consistent with our co-operations approach to Earned Value Management were available to us and were easily tailorable to the specifics of our contract and site. We also had corporate EVMS experts available to us so as to draw upon their recent certification experiences with lessons learned. This knowledge was especially helpful for training of personnel that were involved in the certification which included Project Controls, Project Management and Control Account Managers. We were also able to bring in these corporate experts to assist with our training efforts. To assure our readiness for the review, we conducted a 'White Hat' review. The 'White Hat' team consisted of corporate experts in EVMS along with an industry expert in EVMS from Humphrey and Associates. This review identified early any weaknesses that we had so corrections could be enacted prior to the EVMS Certification Readiness Review. It also helped give the evaluators confidence that we had done proper due diligence prior to their arrival. Also critical to our success, was early communication with our evaluators. It is important to start the communications early to ensure you understand the expectations of the certification team and the process that will be used during the certification. Communication through the entire process is critical to understand expectations and issues along the way. Very important to the overall process was management commitment, support and reinforcement. Management made sure that all personnel involved knew the importance and made preparations a priority. This was noted as a key strength by the evaluators during the out-brief. As a result of our preparation, our review yielded one Corrective Action Report (CAR) and two Continuous Improvement Opportunities (CIOs). The Certification team in their out-brief explained that this was the lowest number of CARs and CIOs in the history of EVMS certifications in the DOE Complex. (authors)« less

  15. 76 FR 7526 - Major System Acquisition; Earned Value Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-10

    ... for engineering support services, steady state operations, basic and applied research, and routine... the requirements in the NASA NPR to apply EVM principles at the program/project level; nor is it...

  16. Earned Value-Added

    NASA Technical Reports Server (NTRS)

    Jansen, Michael

    2005-01-01

    Earned value management [EVM] ...either you swear by it, or swear at it. Either way, there s no getting around the fact that EVM can be one of the most efficient and insightful methods of synthesizing cost, schedule, and technical status information into a single set of program health metrics. Is there a way of implementing EVM that allows a program to reap its early warning benefits while avoiding the pitfalls that make it infamous to its detractors? That s the question recently faced by the International Space Station [ISS] program.

  17. Ectromelia virus encodes a novel family of F-box proteins that interact with the SCF complex.

    PubMed

    van Buuren, Nick; Couturier, Brianne; Xiong, Yue; Barry, Michele

    2008-10-01

    Poxviruses are notorious for encoding multiple proteins that regulate cellular signaling pathways, including the ubiquitin-proteasome system. Bioinformatics indicated that ectromelia virus, the causative agent of lethal mousepox, encoded four proteins, EVM002, EVM005, EVM154, and EVM165, containing putative F-box domains. In contrast to cellular F-box proteins, the ectromelia virus proteins contain C-terminal F-box domains in conjunction with N-terminal ankyrin repeats, a combination that has not been previously reported for cellular proteins. These observations suggested that the ectromelia virus F-box proteins interact with SCF (Skp1, cullin-1, and F-box) ubiquitin ligases. We focused our studies on EVM005, since this protein had only one ortholog in cowpox virus. Using mass spectrometry, we identified cullin-1 as a binding partner for EVM005, and this interaction was confirmed by overexpression of hemagglutinin (HA)-cullin-1. During infection, Flag-EVM005 and HA-cullin-1 colocalized to distinct cellular bodies. Significantly, EVM005 coprecipitated with endogenous Skp1, cullin-1, and Roc1 and associated with conjugated ubiquitin, suggesting that EVM005 interacted with the components of a functional ubiquitin ligase. Interaction of EVM005 with cullin-1 and Skp1 was abolished upon deletion of the F-box, indicating that the F-box played a crucial role in interaction with the SCF complex. Additionally, EVM002 and EVM154 interacted with Skp1 and conjugated ubiquitin, suggesting that ectromelia virus encodes multiple F-box-containing proteins that regulate the SCF complex. Our results indicate that ectromelia virus has evolved multiple proteins that interact with the SCF complex.

  18. Government Accounting

    DTIC Science & Technology

    1999-06-22

    Commercial Industry • Financial Standards Accounting Board (GAAP) • Internal Revenue Service - Tax Accounting • DoD - Cost Accounting Standards...internal management control systems, managers shall focus on results, not process” Government Accounting • Intent EVM Accounting Criteria : – Record costs ...consistent with established budgets – Insure control of indirect costs – Insure disciplined accumulation of cost – Insure proper material accounting and

  19. Manage Toward Success - Utilization of Analytics in Acquisition Decision Making

    DTIC Science & Technology

    2015-04-01

    on the concept of knowledge- based acquisition described by the GAO. In the GAO (2005) report for National Aeronautics and Space Administration ( NASA ...acquisition programs, GAO recommended to NASA , and NASA subsequently con- curred, that transition to a knowledge-based acquisition framework will...Certification and Accreditation Process; ERAM = Enterprise Risk Assessment Manager; EVMS = Earned Value Management System; GOV = Government; POA&M = Plan of

  20. Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

    NASA Technical Reports Server (NTRS)

    Counts, Stacy; Kerby, Jerald

    2006-01-01

    Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

  1. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Cognizant Federal Agency (CFA) as being compliant with the schedule-related guidelines in ANSI/EIA Standard... has not been validated and accepted by the CFA at the time of award, see paragraph (b) of this clause..., at the time of award, the Contractor's EVM system has not been validated and accepted by the CFA as...

  2. Ectromelia Virus BTB/kelch Proteins, EVM150 and EVM167, Interact with Cullin-3 Based Ubiquitin Ligases

    PubMed Central

    Wilton, Brianne A.; Campbell, Stephanie; Van Buuren, Nicholas; Garneau, Robyn; Furukawa, Manabu; Xiong, Yue; Barry., Michele

    2008-01-01

    Cellular proteins containing BTB and kelch domains have been shown to function as adapters for the recruitment of substrates to cullin-3-based ubiquitin ligases. Poxviruses are the only family of viruses known to encode multiple BTB/kelch proteins, suggesting that poxviruses may modulate the ubiquitin pathway through interaction with cullin-3. Ectromelia virus encodes four BTB/kelch proteins and one BTB-only protein. Here we demonstrate that two of the ectromelia virus encoded BTB/kelch proteins, EVM150 and EVM167, interacted with cullin-3. Similar to cellular BTB proteins, the BTB domain of EVM150 and EVM167 was necessary and sufficient for cullin-3 interaction. During infection, EVM150 and EVM167 localized to discrete cytoplasmic regions, which co-localized with cullin-3. Furthermore, EVM150 and EVM167 co-localized and interacted with conjugated ubiquitin, as demonstrated by confocal microscopy and co-immunoprecipitation. Our findings suggest that the ectromelia virus encoded BTB/kelch proteins, EVM150 and EVM167, interact with cullin-3 potentially functioning to recruit unidentified substrates for ubiquitination. PMID:18221766

  3. Agile Metrics: Progress Monitoring of Agile Contractors

    DTIC Science & Technology

    2014-01-01

    epic. The short timeframe is usually called an itera- tion or, in Scrum -based teams, a sprint; multiple iterations make up a release [Lapham 2011...9769 [Rawsthorne 2012] Rawsthorne, Dan. Monitoring Scrum Projects with AgileEVM and Earned Business Value Metrics (EBV). 2012. http...AgileEVM – Earned Value Manage- ment in Scrum Projects.” Presented at Agile2006, 23-28 July 2006. [USAF 2008] United States Air Force. United

  4. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  5. Automated eukaryotic gene structure annotation using EVidenceModeler and the Program to Assemble Spliced Alignments

    PubMed Central

    Haas, Brian J; Salzberg, Steven L; Zhu, Wei; Pertea, Mihaela; Allen, Jonathan E; Orvis, Joshua; White, Owen; Buell, C Robin; Wortman, Jennifer R

    2008-01-01

    EVidenceModeler (EVM) is presented as an automated eukaryotic gene structure annotation tool that reports eukaryotic gene structures as a weighted consensus of all available evidence. EVM, when combined with the Program to Assemble Spliced Alignments (PASA), yields a comprehensive, configurable annotation system that predicts protein-coding genes and alternatively spliced isoforms. Our experiments on both rice and human genome sequences demonstrate that EVM produces automated gene structure annotation approaching the quality of manual curation. PMID:18190707

  6. [Orthopoxvirus genes for kelch-like proteins. III. Construction of mousepox (ectromelia) virus variants with targeted gene deletions].

    PubMed

    Kochneva, G V; Kolosova, I V; Lupan, T A; Sivolobova, G F; Iudin, P V; Grazhdantseva, A A; Riabchikova, E I; Kandrina, N Iu; Shchelkunov, S N

    2009-01-01

    Mousepox (ectromelia) virus genome contains four genes encoding for kelch-like proteins EVM018, EVM027, EVM150 and EVM167. A complete set of insertion plasmids was constructed to allow the production of recombinant ectromelia viruses with targeted deletions of one to four genes of kelch family both individually (single mutants) and in different combinations (double, triple and quadruple mutants). It was shown that deletion of any of the three genes EVMO18, EVM027 or EVM167 resulted in reduction of 50% lethal dose (LD50) by five and more orders in outbred white mice infected intraperitoneally. Deletion of mousepox kelch-gene EVM150 did not influence the virus virulence. Two or more kelch-genes deletion also resulted in high level of attenuation, which could evidently be due to the lack of three genes EVM167, EVM018 and/or EVM027 identified as virulence factors. The local inflammatory process on the model of intradermal injection of mouse ear pinnae (vasodilatation level, hyperemia, cutaneous edema, arterial thrombosis) was significantly more intensive for wild type virus and virulent mutant deltaEVM150 in comparison with avirulent mutant AEVM167.

  7. Medical pluralism and livestock health: ethnomedical and biomedical veterinary knowledge among East African agropastoralists.

    PubMed

    Caudell, Mark A; Quinlan, Marsha B; Quinlan, Robert J; Call, Douglas R

    2017-01-21

    Human and animal health are deeply intertwined in livestock dependent areas. Livestock health contributes to food security and can influence human health through the transmission of zoonotic diseases. In low-income countries diagnosis and treatment of livestock diseases is often carried out by household members who draw upon both ethnoveterinary medicine (EVM) and contemporary veterinary biomedicine (VB). Expertise in these knowledge bases, along with their coexistence, informs treatment and thus ultimately impacts animal and human health. The aim of the current study was to determine how socio-cultural and ecological differences within and between two livestock-keeping populations, the Maasai of northern Tanzania and Koore of southwest Ethiopia, impact expertise in EVM and VB and coexistence of the two knowledge bases. An ethnoveterinary research project was conducted to examine dimensions of EVM and VB knowledge among the Maasai (N = 142 households) and the Koore (N = 100). Cultural consensus methods were used to quantify expertise and the level of agreement on EVM and VB knowledge. Ordinary least squares regression was used to model patterns of expertise and consensus across groups and to examine associations between knowledge and demographic/sociocultural attributes. Maasai and Koore informants displayed high consensus on EVM but only the Koore displayed consensus on VB knowledge. EVM expertise in the Koore varied across gender, herd size, and level of VB expertise. EVM expertise was highest in the Maasai but was only associated with age. The only factor associated with VB expertise was EVM expertise in the Koore. Variation in consensus and the correlates of expertise across the Maassi and the Koore are likely related to differences in the cultural transmission of EVM and VB knowledge. Transmission dynamics are established by the integration of livestock within the socioecological systems of the Maasai and Koore and culture historical experiences with livestock disease. Consideration of the nature and coexistence of EVM and VB provides insight into the capacity of groups to cope with disease outbreaks, pharmaceutical use patterns, and the development of community health interventions.

  8. Ectromelia virus encodes a family of Ankyrin/F-box proteins that regulate NFκB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burles, Kristin, E-mail: burles@ualberta.ca; Buuren, Nicholas van; Barry, Michele

    2014-11-15

    A notable feature of poxviruses is their ability to inhibit the antiviral response, including the nuclear factor kappa B (NFκB) pathway. NFκB is a transcription factor that is sequestered in the cytoplasm until cell stimulation, and relies on the SCF (Skp1, culllin-1, F-box) ubiquitin ligase to target its inhibitor, IκBα, for degradation. IκBα is recruited to the SCF by the F-box domain-containing protein βTrCP. Here, we show that ectromelia virus, the causative agent of mousepox, encodes four F-box-containing proteins, EVM002, EVM005, EVM154, and EVM165, all of which contain Ankyrin (Ank) domains. The Ank/F-box proteins inhibit NFκB nuclear translocation, and thismore » inhibition is dependent on the F-box domain. We also demonstrate that EVM002, EVM005, EVM154, and EVM165 prevent IκBα degradation, suggesting that they target the SCF. This study identifies a new mechanism by which ectromelia virus inhibits NFκB. - Highlights: • Ectromelia virus encodes four Ank/F-box proteins, EVM002, EVM005, EVM154 and EVM165. • The Ank/F-box proteins inhibit NFκB nuclear translocation, dependent on the F-box. • The Ank/F-box proteins prevent IκBα degradation, suggesting they target the SCF. • Deletion of a single Ank/F-box gene from ECTV does not prevent viral NFκB inhibition. • This study identifies a new mechanism by which ectromelia virus inhibits NFκB.« less

  9. Characterization of ectromelia virus deficient in EVM036, the homolog of vaccinia virus F13L, and its application for rapid generation of recombinant viruses.

    PubMed

    Roscoe, Felicia; Xu, Ren-Huan; Sigal, Luis J

    2012-12-01

    The orthopoxvirus (OPV) vaccinia virus (VACV) requires an intact F13L gene to produce enveloped virions (EV) and to form plaques in cell monolayers. Simultaneous introduction of an exogenous gene and F13L into F13L-deficient VACV results in expression of the foreign gene and restoration of plaque size. This is used as a method to rapidly generate VACV recombinants without the need for drug selection. However, whether other OPVs require the orthologs of F13L to generate EV and form plaques, whether F13L orthologs and EV are important for OPV pathogenesis in natural hosts, and whether a system based on F13L ortholog deficiency can be used to generate recombinant OPVs other than VACV have not been reported. The F13L ortholog in ectromelia virus (ECTV), the agent of mousepox, is EVM036. We show that ECTV lacking EVM036 formed small plaques and was highly attenuated in vivo but still induced strong antibody responses. Reintroduction of EVM036 in tandem with the DsRed gene resulted in a virus that expressed DsRed in infected cells but was indistinguishable from wild-type ECTV in terms of plaque size and in vivo virulence. Thus, our data show that, like F13L in VACV, EVM036 is required for ECTV plaque formation and that EVM036 and EV are important for ECTV virulence. Our experiments also suggest that OPVs deficient in F13L orthologs could serve as safer anti-OPV vaccines. Further, our results demonstrate that ECTV deficient in EVM036 can be exploited for the rapid generation of fully virulent ECTV expressing foreign genes of interest.

  10. Ectromelia virus encodes a family of Ankyrin/F-box proteins that regulate NFκB.

    PubMed

    Burles, Kristin; van Buuren, Nicholas; Barry, Michele

    2014-11-01

    A notable feature of poxviruses is their ability to inhibit the antiviral response, including the nuclear factor kappa B (NFκB) pathway. NFκB is a transcription factor that is sequestered in the cytoplasm until cell stimulation, and relies on the SCF (Skp1, culllin-1, F-box) ubiquitin ligase to target its inhibitor, IκBα, for degradation. IκBα is recruited to the SCF by the F-box domain-containing protein βTrCP. Here, we show that ectromelia virus, the causative agent of mousepox, encodes four F-box-containing proteins, EVM002, EVM005, EVM154, and EVM165, all of which contain Ankyrin (Ank) domains. The Ank/F-box proteins inhibit NFκB nuclear translocation, and this inhibition is dependent on the F-box domain. We also demonstrate that EVM002, EVM005, EVM154, and EVM165 prevent IκBα degradation, suggesting that they target the SCF. This study identifies a new mechanism by which ectromelia virus inhibits NFκB. Copyright © 2014 Elsevier Inc. All rights reserved.

  11. EVM005: an ectromelia-encoded protein with dual roles in NF-κB inhibition and virulence.

    PubMed

    van Buuren, Nicholas; Burles, Kristin; Schriewer, Jill; Mehta, Ninad; Parker, Scott; Buller, R Mark; Barry, Michele

    2014-08-01

    Poxviruses contain large dsDNA genomes encoding numerous open reading frames that manipulate cellular signalling pathways and interfere with the host immune response. The NF-κB signalling cascade is an important mediator of innate immunity and inflammation, and is tightly regulated by ubiquitination at several key points. A critical step in NF-κB activation is the ubiquitination and degradation of the inhibitor of kappaB (IκBα), by the cellular SCFβ-TRCP ubiquitin ligase complex. We show here that upon stimulation with TNFα or IL-1β, Orthopoxvirus-infected cells displayed an accumulation of phosphorylated IκBα, indicating that NF-κB activation was inhibited during poxvirus infection. Ectromelia virus is the causative agent of lethal mousepox, a natural disease that is fatal in mice. Previously, we identified a family of four ectromelia virus genes (EVM002, EVM005, EVM154 and EVM165) that contain N-terminal ankyrin repeats and C-terminal F-box domains that interact with the cellular SCF ubiquitin ligase complex. Since degradation of IκBα is catalyzed by the SCFβ-TRCP ubiquitin ligase, we investigated the role of the ectromelia virus ankyrin/F-box protein, EVM005, in the regulation of NF-κB. Expression of Flag-EVM005 inhibited both TNFα- and IL-1β-stimulated IκBα degradation and p65 nuclear translocation. Inhibition of the NF-κB pathway by EVM005 was dependent on the F-box domain, and interaction with the SCF complex. Additionally, ectromelia virus devoid of EVM005 was shown to inhibit NF-κB activation, despite lacking the EVM005 open reading frame. Finally, ectromelia virus devoid of EVM005 was attenuated in both A/NCR and C57BL/6 mouse models, indicating that EVM005 is required for virulence and immune regulation in vivo.

  12. EVM005: An Ectromelia-Encoded Protein with Dual Roles in NF-κB Inhibition and Virulence

    PubMed Central

    Schriewer, Jill; Mehta, Ninad; Parker, Scott; Buller, R. Mark; Barry, Michele

    2014-01-01

    Poxviruses contain large dsDNA genomes encoding numerous open reading frames that manipulate cellular signalling pathways and interfere with the host immune response. The NF-κB signalling cascade is an important mediator of innate immunity and inflammation, and is tightly regulated by ubiquitination at several key points. A critical step in NF-κB activation is the ubiquitination and degradation of the inhibitor of kappaB (IκBα), by the cellular SCFβ-TRCP ubiquitin ligase complex. We show here that upon stimulation with TNFα or IL-1β, Orthopoxvirus-infected cells displayed an accumulation of phosphorylated IκBα, indicating that NF-κB activation was inhibited during poxvirus infection. Ectromelia virus is the causative agent of lethal mousepox, a natural disease that is fatal in mice. Previously, we identified a family of four ectromelia virus genes (EVM002, EVM005, EVM154 and EVM165) that contain N-terminal ankyrin repeats and C-terminal F-box domains that interact with the cellular SCF ubiquitin ligase complex. Since degradation of IκBα is catalyzed by the SCFβ-TRCP ubiquitin ligase, we investigated the role of the ectromelia virus ankyrin/F-box protein, EVM005, in the regulation of NF-κB. Expression of Flag-EVM005 inhibited both TNFα- and IL-1β-stimulated IκBα degradation and p65 nuclear translocation. Inhibition of the NF-κB pathway by EVM005 was dependent on the F-box domain, and interaction with the SCF complex. Additionally, ectromelia virus devoid of EVM005 was shown to inhibit NF-κB activation, despite lacking the EVM005 open reading frame. Finally, ectromelia virus devoid of EVM005 was attenuated in both A/NCR and C57BL/6 mouse models, indicating that EVM005 is required for virulence and immune regulation in vivo. PMID:25122471

  13. Naval Postgraduate School Research. Volume 14, Number 1, February 2004

    DTIC Science & Technology

    2004-02-01

    PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...this review were to ensure officers continue to receive high quality, relevant, and responsive graduate education aligned to defense needs...Initiative (COSSI), Earned Value Management System (EVMS), Activity-Based Costing (ABC), Value Engineering, and lessons from R-TOC Pilots. Sponsored

  14. Ectromelia virus encodes a BTB/kelch protein, EVM150, that inhibits NF-κB signaling.

    PubMed

    Wang, Qian; Burles, Kristin; Couturier, Brianne; Randall, Crystal M H; Shisler, Joanna; Barry, Michele

    2014-05-01

    The NF-κB signaling pathway plays a critical role in inflammation and innate immunity. Consequently, many viruses have evolved strategies to inhibit NF-κB in order to facilitate replication and evasion of the host immune response. Recently, we determined that ectromelia virus, the causative agent of mousepox, contains a family of four BTB/kelch proteins that interact with cullin-3-based ubiquitin ligases. We demonstrate here that expression of EVM150, one of the four BTB/kelch proteins, inhibited NF-κB activation induced by tumor necrosis factor alpha (TNF-α) and interleukin-1β (IL-1β). Although EVM150 inhibited NF-κB p65 nuclear translocation, IκBα degradation was observed, indicating that EVM150 functioned downstream of IκBα degradation. Significantly, expression of the BTB-only domain of EVM150 blocked NF-κB activation, demonstrating that EVM150 functioned independently of the kelch domain and its role as an adapter for cullin-3-based ubiquitin ligases. Furthermore, cullin-3 knockdown by small interfering RNA demonstrated that cullin-3-based ubiquitin ligases are dispensable for TNF-α-induced NF-κB activation. Interestingly, nuclear translocation of IRF3 and STAT1 still occurred in the presence of EVM150, indicating that EVM150 prevented NF-κB nuclear translocation specifically. In addition to identifying EVM150 as an inhibitor of the NF-κB pathway, this study provides new insights into the role of BTB/kelch proteins during virus infection. With the exception of virulence studies, little work has been done to determine the role of poxviral BTB/kelch proteins during infection. This study, for the first time, has identified a mechanism for the ectromelia virus BTB/kelch protein EVM150. Here, we show that EVM150 is a novel inhibitor of the cellular NF-κB pathway, an important component of the antiviral response. This study adds EVM150 to the growing list of NF-κB inhibitors in poxviruses and provides new insights into the role of BTB/kelch proteins during virus infection.

  15. Examining the Perceived Value of Integration of Earned Value Management with Risk Management-Based Performance Measurement Baseline

    ERIC Educational Resources Information Center

    Shah, Akhtar H.

    2014-01-01

    Many projects fail despite the use of evidence-based project management practices such as Performance Measurement Baseline (PMB), Earned Value Management (EVM) and Risk Management (RM). Although previous researchers have found that integrated project management techniques could be more valuable than the same techniques used by themselves, these…

  16. 48 CFR 1834.201 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .../project manager. (iv) EVM is not required on contracts for non-developmental engineering support services, steady state operations, basic and applied research, and routine services such as janitorial services or...

  17. A Novel Adaptive Modulation Based on Nondata-Aided Error Vector Magnitude in Non-Line-Of-Sight Condition of Wireless Sensor Network.

    PubMed

    Yang, Fan; Zeng, Xiaoping; Mao, Haiwei; Jian, Xin; Tan, Xiaoheng; Du, Derong

    2018-01-15

    The high demand for multimedia applications in environmental monitoring, invasion detection, and disaster aid has led to the rise of wireless sensor network (WSN). With the increase of reliability and diversity of information streams, the higher requirements on throughput and quality of service (QoS) have been put forward in data transmission between two sensor nodes. However, lower spectral efficiency becomes a bottleneck in non-line-of-sight (NLOS) transmission of WSN. This paper proposes a novel nondata-aided error vector magnitude based adaptive modulation (NDA-EVM-AM) to solve the problem. NDA-EVM is considered as a new metric to evaluate the quality of NLOS link for adaptive modulation in WSN. By modeling the NLOS scenario as the η - μ fading channel, a closed-form expression for the NDA-EVM of multilevel quadrature amplitude modulation (MQAM) signals over the η - μ fading channel is derived, and the relationship between SER and NDA-EVM is also formulated. Based on these results, NDA-EVM state machine is designed for adaptation strategy. The algorithmic complexity of NDA-EVM-AM is analyzed and the outage capacity of NDA-EVM-AM in an NLOS scenario is also given. The performances of NDA-EVM-AM are compared by simulation, and the results show that NDA-EVM-AM is an effective technique to be used in the NLOS scenarios of WSN. This technique can accurately reflect the channel variations and efficiently adjust modulation order to better match the channel conditions, hence, obtaining better performance in average spectral efficiency.

  18. The Awareness of the International Veterinary Profession of Evidence-Based Veterinary Medicine and Preferred Methods of Training

    PubMed Central

    Huntley, Selene J.; Dean, Rachel S.; Brennan, Marnie L.

    2017-01-01

    Evidence-based veterinary medicine (EVM) is an evolving discipline in veterinary medicine so it is important to periodically “benchmark” opinion about EVM across the profession. An international survey to assess veterinarians’ awareness of EVM was conducted. Veterinarians were surveyed via an online questionnaire (all countries) or a postal questionnaire (UK only). Participants were asked whether they had heard of EVM, where they had first heard the term, and their preferences of method for receiving continuing professional development (CPD). There were 6310 respondents, of which 4579 (72.5%) worked in the UK and 5384 (85.3%) were clinicians. Veterinarians that had heard of EVM (n = 5420, 85.9%) were most likely to be clinicians (OR = 4.00; 95% CI: 3.37, 4.75), respondents working in the UK (OR = 1.32; CI: 1.13, 1.54), or respondents with a postgraduate degree or qualification (OR = 1.77; CI: 1.51, 2.08). The most common sources from which respondents had heard of EVM were at vet school or university (n = 1207, 29.8%), via literature (peer-reviewed papers or other publications) (n = 1074, 26.5%), and via CPD courses (n = 564, 13.9%). Most respondents were interested in finding out more about EVM (n = 4256 of 6173, 69%). The preferred methods of CPD were day or evening seminars (n = 2992 of 6017, 49.7%), conferences (n = 1409, 23.4%), and online courses (n = 524, 8.7%), although the order of preference differed slightly between groups. There appears to be substantial awareness of EVM amongst veterinarians internationally. However, it appears that further training in EVM would be welcomed. Preferences on how CPD in general is received differs between groups, so this should be borne in mind by training providers when formulating a strategy for the dissemination of EVM training across the global profession. PMID:29056674

  19. Characterization of a 300-GHz Transmission System for Digital Communications

    NASA Astrophysics Data System (ADS)

    Hudlička, Martin; Salhi, Mohammed; Kleine-Ostmann, Thomas; Schrader, Thorsten

    2017-08-01

    The paper presents the characterization of a 300-GHz transmission system for modern digital communications. The quality of the modulated signal at the output of the system (error vector magnitude, EVM) is measured using a vector signal analyzer. A method using a digital real-time oscilloscope and consecutive mathematical processing in a computer is shown for analysis of signals with bandwidths exceeding that of state-of-the-art vector signal analyzers. The uncertainty of EVM measured using the real-time oscilloscope is open to analysis. Behaviour of the 300-GHz transmission system is studied with respect to various modulation schemes and different signal symbol rates.

  20. Ectromelia virus encodes an anti-apoptotic protein that regulates cell death.

    PubMed

    Mehta, Ninad; Taylor, John; Quilty, Douglas; Barry, Michele

    2015-01-15

    Apoptosis serves as a powerful defense against damaged or pathogen-infected cells. Since apoptosis is an effective defense against viral infection, many viruses including poxviruses, encode proteins to prevent or delay apoptosis. Here we show that ectromelia virus, the causative agent of mousepox encodes an anti-apoptotic protein EVM025. Here we demonstrate that expression of functional EVM025 is crucial to prevent apoptosis triggered by virus infection and staurosporine. We demonstrate that the expression of EVM025 prevents the conformational activation of the pro-apoptotic proteins Bak and Bax, allowing the maintenance of mitochondrial membrane integrity upon infection with ECTV. Additionally, EVM025 interacted with intracellular Bak. We were able to demonstrate that EVM025 ability to inhibit Bax activation is a function of its ability to inhibit the activity of an upstream BH3 only protein Bim. Collectively, our data indicates that EVM025 inhibits apoptosis by sequestering Bak and inhibiting the activity of Bak and Bax. Copyright © 2014 Elsevier Inc. All rights reserved.

  1. Using Eulerian video magnification to enhance detection of fasciculations in people with amyotrophic lateral sclerosis.

    PubMed

    Van Hillegondsberg, Ludo; Carr, Jonathan; Brey, Naeem; Henning, Franclo

    2017-12-01

    This study seeks to determine whether the use of Eulerian video magnification (EVM) increases the detection of muscle fasciculations in people with amyotrophic lateral sclerosis (PALS) compared with direct clinical observation (DCO). Thirty-second-long video recordings were taken of 9 body regions of 7 PALS and 7 controls, and fasciculations were counted by DCO during the same 30-s period. The video recordings were then motion magnified and reviewed by 2 independent assessors. In PALS, median fasciculation count per body region was 1 by DCO (range 0-10) and 3 in the EVM recordings (range 0-15; P < 0.0001). EVM revealed more fasciculations than DCO in 61% of recordings. In controls, median fasciculation count was 0 for both DCO and EVM. Compared with DCO, EVM significantly increased the detection of fasciculations in body regions of PALS. When it is used to supplement clinical examination, EVM has the potential to facilitate the diagnosis of ALS. Muscle Nerve 56: 1063-1067, 2017. © 2017 Wiley Periodicals, Inc.

  2. Spectrally efficient digitized radio-over-fiber system with k-means clustering-based multidimensional quantization.

    PubMed

    Zhang, Lu; Pang, Xiaodan; Ozolins, Oskars; Udalcovs, Aleksejs; Popov, Sergei; Xiao, Shilin; Hu, Weisheng; Chen, Jiajia

    2018-04-01

    We propose a spectrally efficient digitized radio-over-fiber (D-RoF) system by grouping highly correlated neighboring samples of the analog signals into multidimensional vectors, where the k-means clustering algorithm is adopted for adaptive quantization. A 30  Gbit/s D-RoF system is experimentally demonstrated to validate the proposed scheme, reporting a carrier aggregation of up to 40 100 MHz orthogonal frequency division multiplexing (OFDM) channels with quadrate amplitude modulation (QAM) order of 4 and an aggregation of 10 100 MHz OFDM channels with a QAM order of 16384. The equivalent common public radio interface rates from 37 to 150  Gbit/s are supported. Besides, the error vector magnitude (EVM) of 8% is achieved with the number of quantization bits of 4, and the EVM can be further reduced to 1% by increasing the number of quantization bits to 7. Compared with conventional pulse coding modulation-based D-RoF systems, the proposed D-RoF system improves the signal-to-noise-ratio up to ∼9  dB and greatly reduces the EVM, given the same number of quantization bits.

  3. Integrated Baseline Review (IBR) Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.

  4. Ethnoveterinary health management practices using medicinal plants in South Asia - a review.

    PubMed

    Suroowan, Shanoo; Javeed, Faisal; Ahmad, Mushtaq; Zafar, Muhammad; Noor, Mehwish Jamil; Kayani, Sadaf; Javed, Ali; Mahomoodally, Mohamad Fawzi

    2017-06-01

    Animal rearing is the major occupation of most population of South Asian countries. Due to lack of resources and limited approach to modern medicine, most of the livestock raisers prefer to use plant-based traditional medicine also referred to as ethnoveterinary medicine (EVM). Indeed, the use of medicinal plants in South Asia dates back to several centuries with documented evidences. However, there is currently a dearth of documentation and compilation of use of medicinal plants for animal diseases in this part of the world. This review aims to provide an up-to-date compilation of common medicinal plants used for the treatment and/or management of common animal diseases in South Asian countries. Extensive literature search was conducted online and relevant data was retrieved from well-known scientific databases. A total of 276 plants belonging to 95 families have been documented to be in common use for managing 14 different categories of animal diseases. Solanaceae, Lamiaceae, Fabaceae, and Leguminosae were most common plant families in terms of their plant species used for EVM. Gastric diseases were commonly reported and accounted for 72 species of plants used for its treatment followed by the miscellaneous disorders category and skin diseases comprising of 65 and 39 plant species respectively. Herbs accounted for 46% of the total plant species, followed by trees (33%), and shrubs (18%). The EVM were applied through different routes of administration; oral administration accounted for 72% followed by topical application 27%, while burning of plant parts to create smoke around animals to repel insects was less common (1%). It is anticipated that the present review will stimulate further ethnoveterinary research among livestock disease management practices in South Asia.

  5. Evaluating Federal Information Technology Program Success Based on Earned Value Management

    ERIC Educational Resources Information Center

    Moy, Mae N.

    2016-01-01

    Despite the use of earned value management (EVM) techniques to track development progress, federal information (IT) software programs continue to fail by not meeting identified business requirements. The purpose of this logistic regression study was to examine, using IT software data from federal agencies from 2011 to 2014, whether a relationship…

  6. Quantification of MDL-induced signal degradation in MIMO-OFDM mode-division multiplexing systems.

    PubMed

    Tian, Yu; Li, Juhao; Zhu, Paikun; Wu, Zhongying; Chen, Yuanxiang; He, Yongqi; Chen, Zhangyuan

    2016-08-22

    Mode-division multiplexing (MDM) transmission over few-mode optical fiber has emerged as a promising technology to enhance transmission capacity, in which multiple-input-multiple-output (MIMO) digital signal processing (DSP) after coherent detection is used to demultiplex the signals. Compared with conventional single-mode systems, MIMO-MDM systems suffer non-recoverable signal degradation induced by mode-dependent loss (MDL). In this paper, the MDL-induced signal degradation in orthogonal-frequency-division-multiplexing (OFDM) MDM systems is theoretically quantified in terms of mode-average error vector magnitude (EVM) through frequency domain norm analysis. A novel scalar MDL metric is proposed considering the probability distribution of the practical MDM input signals, and a closed-form expression for EVM measured after zero-force (ZF) MIMO equalization is derived. Simulation results show that the EVM estimations utilizing the novel MDL metric remain unbiased for unrepeated links. For a 6 × 100 km 20-mode MDM transmission system, the estimation accuracy is improved by more than 90% compared with that utilizing traditional condition number (CN) based MDL metric. The proposed MDL metric can be used to predict the MDL-induced SNR penalty in a theoretical manner, which will be beneficial for the design of practical MIMO-MDM systems.

  7. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    DTIC Science & Technology

    2017-12-01

    carefully to ensure only minimum information needed for effective management control is requested.  Requires cost-benefit analysis and PM...baseline offers metrics that highlights performance treads and program variances. This information provides Program Managers and higher levels of...The existing training philosophy is effective only if the managers using the information have well trained and experienced personnel that can

  8. Comparison of Insecticide-Treated Nets and Indoor Residual Spraying to Control the Vector of Visceral Leishmaniasis in Mymensingh District, Bangladesh

    PubMed Central

    Chowdhury, Rajib; Dotson, Ellen; Blackstock, Anna J.; McClintock, Shannon; Maheswary, Narayan P.; Faria, Shyla; Islam, Saiful; Akter, Tangin; Kroeger, Axel; Akhter, Shireen; Bern, Caryn

    2011-01-01

    Integrated vector management is a pillar of the South Asian visceral leishmaniasis (VL) elimination program, but the best approach remains a matter of debate. Sand fly seasonality was determined in 40 houses sampled monthly. The impact of interventions on Phlebotomus argentipes density was tested from 2006–2007 in a cluster-randomized trial with four arms: indoor residual spraying (IRS), insecticide-treated nets (ITNs), environmental management (EVM), and no intervention. Phlebotomus argentipes density peaked in March with the highest proportion of gravid females in May. The EVM (mud plastering of wall and floor cracks) showed no impact. The IRS and ITNs were associated with a 70–80% decrease in male and female P. argentipes density up to 5 months post intervention. Vector density rebounded by 11 months post-IRS, whereas ITN-treated households continued to show significantly lower density compared with households without intervention. Our data suggest that both IRS and ITNs may help to improve VL control in Bangladesh. PMID:21540372

  9. Thermal design verification testing for the ATS-F and -G spacecraft.

    NASA Technical Reports Server (NTRS)

    Coyle, M.; Greenwell, J.

    1972-01-01

    There is a wide fluctuation in the internal power dissipation from the components within the earth viewing module (EVM). The electronic component functional reliability required for a two-to-five year mission is the most significant factor for the thermal design criteria. A mathematical thermal model of the EVM and the orbital environment is used to predict the performance of the thermal control system. Comparisons of the results obtained in chamber thermal balance tests with the data computed on the basis of the theoretical model provide the means for validating the thermal design.

  10. EVMS Self-Surveillance of Remote Handled Low Level Waste (RHLLW) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Michael L.; Case, Kimberly; Hergesheimer, Linda

    2013-07-01

    DOE G 413.3-10A, Section 3.a states: “The Contractor has primary responsibility for implementing and maintaining a surveillance program to ensure continued compliance of the system with ANSI/EIA-748B. DOE O 413.3B requires the FPD to ensure the contractor conducts a Self-Surveillance annually. This annual Self-Surveillance,…should cover all 32 guidelines of the ANSI/EIA748B. Documentation of the Self-Surveillance is sent to the CO and the PMSO (copy to OECM) confirming the continued compliance of their EVMS ANSI/EIA748B...” This review, and the associated report, is deemed to satisfy this requirement.

  11. School Security Solutions: Bringing Corporate Safety to Schools and Colleges with EasyLobbyTM Software.

    ERIC Educational Resources Information Center

    Pendzick, Richard E.; Downs, Robert L.

    2002-01-01

    Describes software for electronic visitor management (EVM) called EasyLobbyTM, currently in use in thousands of federal and corporate installations throughout the world and its application for school and campus environments. Explains EasyLobbyTM's use to replace visitor logs, capture and store visitor data electronically, and provide badges that…

  12. Understanding the policy environment for immunization supply chains: Lessons learned from landscape analyses in Uganda and Senegal.

    PubMed

    Luzze, Henry; Badiane, Ousseynou; Mamadou Ndiaye, El Hadji; Ndiaye, Annette Seck; Atuhaire, Brian; Atuhebwe, Phionah; Guinot, Phillippe; Fry Sosne, Erin; Gueye, Abdoulaye

    2017-04-19

    As immunization programs around the world undergo rapid change and expansion, supply chain and logistics systems have become strained, making it increasingly challenging for national public health systems to provide reliable, safe, and efficient access to vaccines. Governments and immunization partners have been aware of this problem for several years, and in 2010, the World Health Organization (WHO) launched the Effective Vaccine Management (EVM) process to help countries identify shortcomings in their immunization supply chains and develop plans for systematic improvement. EVM improvement plans now exist in all Gavi-eligible countries plus many middle- and upper-income countries; however, implementation has been slow and in many cases fraught with financial, managerial, structural, and political roadblocks. Recognizing that significant change of any kind requires a supportive policy environment and strong leadership, PATH began working in Uganda and Senegal to landscape the policy environment around immunization and identify relevant policies, administrative and technical roles and responsibilities, and other issues that may be affecting the supply chain for immunization. The policy landscape assessments included a desk review and a series of structured, in-depth interviews with key international, national, and local stakeholders. The findings highlighted a number of critical issues and challenges in both countries that may be preventing supply chains from functioning optimally. These challenges include a need for better coordination and planning between immunization programs and supply chain managers; the need for sufficient, timely and reliable financing for all aspects of immunization programs; the need for high-level managers trained in immunization supply chain management; and an urgent need for better, more timely data for decision-making. Overcoming these challenges will require the involvement of high-level political actors-including ministers of health and finance, parliamentarians, and other officials who have the ability to approve and influence policy, personnel, and structural changes; ensure work plans are backed with adequate resources for implementation; and hold program managers accountable for achieving agreed indicators. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  13. Comparison of numerical predictions of horizontal nonisothermal jet in a room with three turbulence models -- {kappa}-{epsilon} EVM, ASM, and DSM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murakami, Shuzo; Kato, Shinsuke; Ooka, Ryozo

    1994-12-31

    A three-dimensional nonisothermal jet in a room is analyzed numerically by the standard {kappa}-{epsilon} eddy viscosity model (EVM) and two second-moment closure models-the algebraic stress model (ASM) (Hossain and Rodi 1982) and the differential stress model (DSM) (Launder et al. 1975). Numerical results given by these turbulence models are compared with experimental results, and the prediction errors existing in the results are examined, thus clarifying the relative structural differences between the {kappa}-{epsilon} EVM and the second-moment closure models. Since the second moment closure models clearly manifest the turbulence structures of the flow field, they are more accurate than the {kappa}-{epsilon}more » EVM. A small difference between the DSM and the ASM -- one based on an inappropriate approximation of the convection and diffusion terms in the Reynolds stress transport equations in the ASM -- is also observed.« less

  14. Applying EVM to Satellite on Ground and In-Orbit Testing - Better Data in Less Time

    NASA Technical Reports Server (NTRS)

    Peters, Robert; Lebbink, Elizabeth-Klein; Lee, Victor; Model, Josh; Wezalis, Robert; Taylor, John

    2008-01-01

    Using Error Vector Magnitude (EVM) in satellite integration and test allows rapid verification of the Bit Error Rate (BER) performance of a satellite link and is particularly well suited to measurement of low bit rate satellite links where it can result in a major reduction in test time (about 3 weeks per satellite for the Geosynchronous Operational Environmental Satellite [GOES] satellites during ground test) and can provide diagnostic information. Empirical techniques developed to predict BER performance from EVM measurements and lessons learned about applying these techniques during GOES N, O, and P integration test and post launch testing, are discussed.

  15. Innovative Approaches to Remote Sensing in NASA's Earth System Science Pathfinder (ESSP) Program

    NASA Technical Reports Server (NTRS)

    Peri, Frank; Volz, Stephen

    2013-01-01

    NASA's Earth Venture class (EV) of mission are competitively selected, Principal Investigator (PI) led, relatively low cost and narrowly focused in scientific scope. Investigations address a full spectrum of earth science objectives, including studies of the atmosphere, oceans, land surface, polar ice regions, and solid Earth. EV has three program elements: EV-Suborbital (EVS) are suborbital/airborne investigations; EV-Mission (EVM) element comprises small complete spaceborne missions; and EV-Instrument (EVI) element develops spaceborne instruments for flight as missions-of-opportunity (MoO). To ensure the success of EV, the management approach of each element is tailored according to the specific needs of the element.

  16. Applying the Expectancy-Value Model to understand health values.

    PubMed

    Zhang, Xu-Hao; Xie, Feng; Wee, Hwee-Lin; Thumboo, Julian; Li, Shu-Chuen

    2008-03-01

    Expectancy-Value Model (EVM) is the most structured model in psychology to predict attitudes by measuring attitudinal attributes (AAs) and relevant external variables. Because health value could be categorized as attitude, we aimed to apply EVM to explore its usefulness in explaining variances in health values and investigate underlying factors. Focus group discussion was carried out to identify the most common and significant AAs toward 5 different health states (coded as 11111, 11121, 21221, 32323, and 33333 in EuroQol Five-Dimension (EQ-5D) descriptive system). AAs were measured in a sum of multiplications of subjective probability (expectancy) and perceived value of attributes with 7-point Likert scales. Health values were measured using visual analog scales (VAS, range 0-1). External variables (age, sex, ethnicity, education, housing, marital status, and concurrent chronic diseases) were also incorporated into survey questionnaire distributed by convenience sampling among eligible respondents. Univariate analyses were used to identify external variables causing significant differences in VAS. Multiple linear regression model (MLR) and hierarchical regression model were used to investigate the explanatory power of AAs and possible significant external variable(s) separately or in combination, for each individual health state and a mixed scenario of five states, respectively. Four AAs were identified, namely, "worsening your quality of life in terms of health" (WQoL), "adding a burden to your family" (BTF), "making you less independent" (MLI) and "unable to work or study" (UWS). Data were analyzed based on 232 respondents (mean [SD] age: 27.7 [15.07] years, 49.1% female). Health values varied significantly across 5 health states, ranging from 0.12 (33333) to 0.97 (11111). With no significant external variables identified, EVM explained up to 62% of the variances in health values across 5 health states. The explanatory power of 4 AAs were found to be between 13% and 28% in separate MLR models (P < 0.05). When data were analyzed for each health state, variances in health values became small and explanatory power of EVM was reduced to a range between 8% and 23%. EVM was useful in explaining variances of health values and predicting important factors. Its power to explain small variances might be restricted due to limitations of 7-point Likert scale to measure AAs accurately. With further improvement and validation of a compatible continuous scale for more accurate measurement, EVM is expected to explain health values to a larger extent.

  17. 48 CFR 334.201 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... & Validation services), steady state operations, basic and applied research, and routine services (e.g... of the cognizant HCA. (b) EVM is not required, but may be applied with prior written approval of the...(s) under FAR Part 12. (c) When full EVM is required on a prime contract, it applies to subcontracts...

  18. Characterization of dual-polarization LTE radio over a free-space optical turbulence channel.

    PubMed

    Bohata, J; Zvanovec, S; Korinek, T; Mansour Abadi, M; Ghassemlooy, Z

    2015-08-10

    A dual polarization (DP) radio over a free-space optical (FSO) communication link using a long-term evolution (LTE) radio signal is proposed and analyzed under different turbulence channel conditions. Radio signal transmission over the DP FSO channel is experimentally verified by means of error vector magnitude (EVM) statistics. We demonstrate that such a system, employing a 64 quadrature amplitude modulation at the frequency bands of 800 MHz and 2.6 GHz, evinces reliability with <8% of EVM in a turbulent channel. Based on the results, we show that transmitting the LTE signal over the FSO channel is a potential solution for last-mile access or backbone networks, when using multiple-input multiple-output based DP signals.

  19. Numerical modelling of multimode fibre-optic communication lines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sidelnikov, O S; Fedoruk, M P; Sygletos, S

    The results of numerical modelling of nonlinear propagation of an optical signal in multimode fibres with a small differential group delay are presented. It is found that the dependence of the error vector magnitude (EVM) on the differential group delay can be reduced by increasing the number of ADC samples per symbol in the numerical implementation of the differential group delay compensation algorithm in the receiver. The possibility of using multimode fibres with a small differential group delay for data transmission in modern digital communication systems is demonstrated. It is shown that with increasing number of modes the strong couplingmore » regime provides a lower EVM level than the weak coupling one. (fibre-optic communication lines)« less

  20. The U.S. Department of Defenses Earned Value ManagementAnalyst Workforce

    DTIC Science & Technology

    2016-01-01

    as best suits each component’s unique acquisition requirements and culture. As the functional lead for this diverse and cross- functional workforce ...EVM workforces in unique arrangements, as best suits each component’s unique acquisition requirements and culture. As the FL for this diverse and...quality of the data collected by gathering insights into the diverse organization of the acquisition workforce and unique data structure across DoD

  1. 24-26  GHz radio-over-fiber and free-space optics for fifth-generation systems.

    PubMed

    Bohata, Jan; Komanec, Matěj; Spáčil, Jan; Ghassemlooy, Zabih; Zvánovec, Stanislav; Slavík, Radan

    2018-03-01

    This Letter outlines radio-over-fiber combined with radio-over-free-space optics (RoFSO) and radio frequency free-space transmission, which is of particular relevance for fifth-generation networks. Here, the frequency band of 24-26 GHz is adopted to demonstrate a low-cost, compact, and high-energy-efficient solution based on the direct intensity modulation and direct detection scheme. For our proof-of-concept demonstration, we use 64 quadrature amplitude modulation with a 100 MHz bandwidth. We assess the link performance by exposing the RoFSO section to atmospheric turbulence conditions. Further, we show that the measured minimum error vector magnitude (EVM) is 4.7% and also verify that the proposed system with the free-space-optics link span of 100 m under strong turbulence can deliver an acceptable EVM of <9% with signal-to-noise ratio levels of 22 dB and 10 dB with and without turbulence, respectively.

  2. Effect of Rubber Polarity on Cluster Formation in Rubbers Cross-Linked with Diels–Alder Chemistry

    PubMed Central

    2017-01-01

    Diels–Alder chemistry has been used for the thermoreversible cross-linking of furan-functionalized ethylene/propylene (EPM) and ethylene/vinyl acetate (EVM) rubbers. Both furan-functionalized elastomers were successfully cross-linked with bismaleimide to yield products with a similar cross-link density. NMR relaxometry and SAXS measurements both show that the apolar EPM-g-furan precursor contains phase-separated polar clusters and that cross-linking with polar bismaleimide occurs in these clusters. The heterogeneously cross-linked network of EPM-g-furan contrasts with the homogeneous network in the polar EVM-g-furan. The heterogeneous character of the cross-links in EPM-g-furan results in a relatively high Young’s modulus, whereas the more uniform cross-linking in EVM-g-furan results in a higher tensile strength and elongation at break. PMID:29213149

  3. Juggling Act: Re-Planning and Building on Observatory...Simultaneously!

    NASA Technical Reports Server (NTRS)

    Zavala, Eddie; Daws, Patricia

    2011-01-01

    SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.

  4. Putting EVM to the Test

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald; Counts, Stacy

    2005-01-01

    IN MANY INSTANCES THERE IS NO FOREWARNING; SCHEDULES slip, costs soar, and the project manager is faced with the near impossible task of explaining why each impact occurred. With contractors performing the majority of the work, the management job can become even more obscure. The simple lack of proximity to the contractor can limit effective communication. Add to that a mixture of cultural differences and a desire for the contractor to portray the most optimistic view of their performance, and you create an even more difficult task for the project manager. This was the scenario when the Habitat Holding Rack (HHR) manager at Marshall Space Flight Center (MSFC), Stacy Counts, was introduced to the overall concept of Earned Value Management (EVM). Faced with increased costs (which eventually resulted in decreased scope of the project), continued schedule slides, and several technical anomalies, she was looking for a way to gain a better handle on the project performance. As a component of the Space Station Biological Research Program (SSBRP), the HHR project is an integral piece of the Program content. The HHR is the first rack hardware to be delivered for the Program and has therefore been the first rack to move through the trials of test and verification-documenting anomalies and technical difficulties that will benefit the other SSBRP rack projects. For these reasons, the HHR maintained high visibility throughout the manufacturing and assembly process, continuing through test and verification activities. Needless to say, the higher visibility emphasized the need for improved performance on this project. And to improve project performance, Stacy first had to figure out how to measure the cost, schedule and technical objectives effectively.

  5. Field-programmable gate array implementation of an all-digital IEEE 802.15.4-compliant transceiver

    NASA Astrophysics Data System (ADS)

    Cornetta, Gianluca; Touhafi, Abdellah; Santos, David J.; Vázquez, José M.

    2010-12-01

    An architecture for a low-cost, low-complexity digital transceiver is presented in this article. The proposed architecture targets the IEEE 802.15.4 standard for short-range wireless personal area networks and has been implemented as a synthesisable VHDL register transfer level description. The system has been evaluated and tested using a Xilinx 90 nm Virtex-4 field-programmable gate array as the target technology. Bit error rate (BER) and error vector magnitude (EVM) have been used as the figures of merit for modem performance. Simulations show that the recommended minimum BER is achieved at E b/N 0 = 8.7 dB, whereas the EVM is 19.5%. The implemented device occupies 10% of the target FPGA and has a normalised maximum power consumption of 44 mW in transmit mode and 53 mW in receiver mode.

  6. Real100G.RF: A Fully Packaged 240 GHz Transmitter with In-Antenna Power Combining in 0.13 μm SiGe Technology

    NASA Astrophysics Data System (ADS)

    Malz, Stefan; Goettel, Benjamin; Eisenbeis, Joerg; Boes, Florian; Grzyb, Janusz; Vazquez, Pedro Rodriguez; Zwick, Thomas; Pfeiffer, Ullrich R.

    2017-09-01

    This paper reports on the research activities during the first phase of the project Real100G.RF, which is part of the German Research Foundation (DFG) priority programm SPP1655. The project's main objective is to research silicon-based wireless communication above 200 GHz to enable data rates in excess of 100 gigabit per second (Gbps). To that end, this paper presents a fully packaged 240 GHz RF transmitter front-end with power combining antenna in 0.13 μm SiGe technology. The design of circuit building blocks, passives, antenna and high-speed packaging is discussed. Communication measurements show data rates of 8 Gbps with an EVM of 12.4% using 16-QAM, 24 Gbps with 26.5% EVM using QPSK and 30 Gbps with 27.9% EVM using 8-PSK.

  7. Investigation of broadband digital predistortion for broadband radio over fiber transmission systems

    NASA Astrophysics Data System (ADS)

    Zhang, Xiupu; Liu, Taijun; Shen, Dongya

    2016-12-01

    In future broadband cloud radio access networks (C-RAN), front-haul transmission systems play a significant role in performance and cost of C-RAN. Broadband and high linearity radio over fiber (RoF) transmission systems are considered a promising solution for the front-haul. Digital linearization is one possible solution for RoF front-haul. In this paper, we investigate RF domain digital predistortion (DPD) linearization for broadband RoF front-haul. The implemented DPD is first investigated in 2.4 GHz WiFi over fiber transmission systems at 36 Mb/s, and more than 8-dB and 5.6-dB improvements of error vector magnitude (EVM) are achieved in back to back (BTB) and after 10 km single mode fiber (SMF) transmission. Further, both WiFi and ultra wide band (UWB) wireless signals are transmitted together, in which the DPD has linearization bandwidth of 2.4 GHz. It is shown that the implemented DPD leads to EVM improvements of 4.5-dB (BTB) and 3.1-dB (10 km SMF) for the WiFi signal, and 4.6-dB (BTB) and 4-dB (10 km SMF) for the broadband UWB signal.

  8. Algorithm-Based Motion Magnification for Video Processing in Urological Laparoscopy.

    PubMed

    Adams, Fabian; Schoelly, Reto; Schlager, Daniel; Schoenthaler, Martin; Schoeb, Dominik S; Wilhelm, Konrad; Hein, Simon; Wetterauer, Ulrich; Miernik, Arkadiusz

    2017-06-01

    Minimally invasive surgery is in constant further development and has replaced many conventional operative procedures. If vascular structure movement could be detected during these procedures, it could reduce the risk of vascular injury and conversion to open surgery. The recently proposed motion-amplifying algorithm, Eulerian Video Magnification (EVM), has been shown to substantially enhance minimal object changes in digitally recorded video that is barely perceptible to the human eye. We adapted and examined this technology for use in urological laparoscopy. Video sequences of routine urological laparoscopic interventions were recorded and further processed using spatial decomposition and filtering algorithms. The freely available EVM algorithm was investigated for its usability in real-time processing. In addition, a new image processing technology, the CRS iimotion Motion Magnification (CRSMM) algorithm, was specifically adjusted for endoscopic requirements, applied, and validated by our working group. Using EVM, no significant motion enhancement could be detected without severe impairment of the image resolution, motion, and color presentation. The CRSMM algorithm significantly improved image quality in terms of motion enhancement. In particular, the pulsation of vascular structures could be displayed more accurately than in EVM. Motion magnification image processing technology has the potential for clinical importance as a video optimizing modality in endoscopic and laparoscopic surgery. Barely detectable (micro)movements can be visualized using this noninvasive marker-free method. Despite these optimistic results, the technology requires considerable further technical development and clinical tests.

  9. USSR and Eastern Europe Scientific Abstracts, Cybernetics, Computers, and Automation Technology, Number 26

    DTIC Science & Technology

    1977-01-26

    Sisteme Matematicheskogo Obespecheniya YeS EVM [ Applied Programs in the Software System for the Unified System of Computers], by A. Ye. Fateyev, A. I...computerized systems are most effective in large production complexes , in which the level of utilization of computers can be as high as 500,000...performance of these tasks could be furthered by the complex introduction of electronic computers in automated control systems. The creation of ASU

  10. Opportunities for Small Satellites in NASA's Earth System Science Pathfinder (ESSP) Program

    NASA Technical Reports Server (NTRS)

    Peri, Frank; Law, Richard C.; Wells, James E.

    2014-01-01

    NASA's Earth Venture class (EV) of missions are competitively selected, Principal Investigator (PI) led, relatively low cost and narrowly focused in scientific scope. Investigations address a full spectrum of earth science objectives, including studies of the atmosphere, oceans, land surface, polar ice regions, and solid Earth. EV has three program elements: EV-Suborbital (EVS) are suborbital/airborne investigations; EV-Mission (EVM) element comprises small complete spaceborne missions; and EV-Instrument (EVI) element develops spaceborne instruments for flight as Missions-of-Opportunity (MoO). To ensure the success of EV, frequent opportunities for selecting missions has been established in NASA's Earth Science budget. This paper will describe those opportunities and how the management approach of each element is tailored according to the specific needs of the element.

  11. 802.11ac WLAN MIMO radio-over-fiber distributed antenna system for in-building networks based on multicore fiber

    NASA Astrophysics Data System (ADS)

    Morant, Maria; Llorente, Roberto

    2017-01-01

    In this work we propose and evaluate experimentally the performance of IEEE 802.11ac WLAN standard signals in radio-over-fiber (RoF) distributed-antenna systems based on multicore fiber (MCF) for in-building WLAN connectivity. The RoF performance of WLAN signals with different bandwidth is investigated considering up to IEEE 802.11ac maximum of 160 MHz per user. We evaluate experimentally the performance of WLAN signals employing different modulation and coding schemes achieving bitrates from 78 Mbps to 1404 Mbps per user in distances up to 300 m in a 4-core MCF. The performance of the wireless standard multiple-input multiple-output (MIMO) processing algorithms included in WLAN signals applied to the RoF transmission in MCF optical systems is also evaluated. The impact on the quality of the signal from one of the cores in the MIMO processing is investigated and compared with the results achieved with single-input single-output (SISO) transmission in each core. We measured the error vector magnitude (EVM) and the OFDM data burst information of the received WLAN signals after RoF transmission for different distributed-antenna systems with uni- and bi-directional MCF communication. Finally, we compare the received EVM of a single-antenna system (SISO arrangement) with WLAN systems using two antennas (2×2 MIMO) and four antennas (4×4 MIMO).

  12. Growth of a Large Composite Magma System: the EJB Pluton, Eastern California.

    NASA Astrophysics Data System (ADS)

    Matty, D. J.; Vervoort, J.; Dufrane, A.; Hart, G.; Student, J.; Morgan, S.

    2008-12-01

    The composite EJB pluton crops out in the White-Inyo Mountains of eastern California, and comprises the Eureka Valley monzonite (EVM), the Joshua Flat quartz monzonite (JFQM), the Beer Creek granite (BCG), and an unnamed diorite. While sometimes equivocal, field relationships suggest that the EVM was emplaced first, followed by the JFQM, and finally the BCG; the diorite predates the BCG. Sylvester and others (GSAB, 1978) reported zircon U-Pb ages of 179±2 Ma for the EVM and 174±5 Ma for the JFQM. Coleman and others (GSAB, 2003) determined a U-Pb age of 179±3 Ma (via Pb-loss trajectory) for the BCG. Because of the uncertainty in the ages and ambiguous field relations, the sequence and duration of EJB magmatism remain unclear. To understand more fully the timing of EJB magmatism, we separated zircons from 12 samples collected from each of the main EJB units. These samples were characterized using light microscopy, SEM and CL techniques. U-Pb ages were determined from individual zircons by LA-ICP-MS following the method of Chang and others (G3, 2006). For the ages reported below, the reported uncertainties are based on factors within the analysis, but do not include external factors such as sample/standard bias or other matrix effects. Overall uncertainty in LA-ICPMS U-Pb geochronology is hard to assess, but we estimate that all ages reported below are subject to a minimum 2% uncertainty. We determined a concordant U-Pb age of 180±2 Ma for the EVM, which agrees with the results of Sylvester and others (1978). The unnamed diorite produced a concordant U-Pb age of 177±3 Ma. Concordant U-Pb ages of 172±2, 172±3, 173±2, 174±2, and 175±2 Ma were determined for individual samples of the JFQM and agree with the age reported by Sylvester and others (1978) of 174±5 Ma. Concordant U-Pb ages of 168±4, 168±3, 169±1, 172±2, and 172±2 Ma were determined for individual BCG samples. Within the reported error, there is no difference in age between individual samples of the BCG, but taken as absolute, the ages tantalizingly decrease from NW to SE within the exposed area of the BCG. No such pattern is suggested within the JFQM. Collectively, these new LA-ICP-MS zircon age data support the observed field relationships and suggest that the EJB magma system was periodically active for as long as 10-12 million years. This time scale agrees well with current models of incremental growth of plutons and has important implications for strain accumulation in mid-crustal arc environments.

  13. Improved Measurement of Ejection Velocities From Craters Formed in Sand

    NASA Technical Reports Server (NTRS)

    Cintala, Mark J.; Byers, Terry; Cardenas, Francisco; Montes, Roland; Potter, Elliot E.

    2014-01-01

    A typical impact crater is formed by two major processes: compression of the target (essentially equivalent to a footprint in soil) and ejection of material. The Ejection-Velocity Measurement System (EVMS) in the Experimental Impact Laboratory has been used to study ejection velocities from impact craters formed in sand since the late 1990s. The original system used an early-generation Charge-Coupled Device (CCD) camera; custom-written software; and a complex, multicomponent optical system to direct laser light for illumination. Unfortunately, the electronic equipment was overtaken by age, and the software became obsolete in light of improved computer hardware.

  14. Francis-99 turbine numerical flow simulation of steady state operation using RANS and RANS/LES turbulence model

    NASA Astrophysics Data System (ADS)

    Minakov, A.; Platonov, D.; Sentyabov, A.; Gavrilov, A.

    2017-01-01

    We performed numerical simulation of flow in a laboratory model of a Francis hydroturbine at three regimes, using two eddy-viscosity- (EVM) and a Reynolds stress (RSM) RANS models (realizable k-ɛ, k-ω SST, LRR) and detached-eddy-simulations (DES), as well as large-eddy simulations (LES). Comparison of calculation results with the experimental data was carried out. Unlike the linear EVMs, the RSM, DES, and LES reproduced well the mean velocity components, and pressure pulsations in the diffusor draft tube. Despite relatively coarse meshes and insufficient resolution of the near-wall region, LES, DES also reproduced well the intrinsic flow unsteadiness and the dominant flow structures and the associated pressure pulsations in the draft tube.

  15. Aerogel Antennas Communications Study Using Error Vector Magnitude Measurements

    NASA Technical Reports Server (NTRS)

    Miranda, Felix A.; Mueller, Carl H.; Meador, Mary Ann B.

    2014-01-01

    This presentation discusses an aerogel antennas communication study using error vector magnitude (EVM) measurements. The study was performed using 2x4 element polyimide (PI) aerogel-based phased arrays designed for operation at 5 GHz as transmit (Tx) and receive (Rx) antennas separated by a line of sight (LOS) distance of 8.5 meters. The results of the EVM measurements demonstrate that polyimide aerogel antennas work appropriately to support digital communication links with typically used modulation schemes such as QPSK and 4 DQPSK. As such, PI aerogel antennas with higher gain, larger bandwidth and lower mass than typically used microwave laminates could be suitable to enable aerospace-to- ground communication links with enough channel capacity to support voice, data and video links from CubeSats, unmanned air vehicles (UAV), and commercial aircraft.

  16. Aerogel Antennas Communications Study Using Error Vector Magnitude Measurements

    NASA Technical Reports Server (NTRS)

    Miranda, Felix A.; Mueller, Carl H.; Meador, Mary Ann B.

    2014-01-01

    This paper discusses an aerogel antennas communication study using error vector magnitude (EVM) measurements. The study was performed using 4x2 element polyimide (PI) aerogel-based phased arrays designed for operation at 5 GHz as transmit (Tx) and receive (Rx) antennas separated by a line of sight (LOS) distance of 8.5 meters. The results of the EVM measurements demonstrate that polyimide aerogel antennas work appropriately to support digital communication links with typically used modulation schemes such as QPSK and pi/4 DQPSK. As such, PI aerogel antennas with higher gain, larger bandwidth and lower mass than typically used microwave laminates could be suitable to enable aerospace-to-ground communication links with enough channel capacity to support voice, data and video links from cubesats, unmanned air vehicles (UAV), and commercial aircraft.

  17. A polarization-division multiplexing SSB-OFDM system with beat interference cancellation receivers

    NASA Astrophysics Data System (ADS)

    Yang, Peiling; Ma, Jianxin; Zhang, Junyi

    2018-06-01

    In this paper, we have proposed a polarization-division multiplexing (PDM) single-sideband optical orthogonal frequency division multiplexing (SSB-OOFDM) scheme with signal-signal beat interference cancellation receivers with balanced detection (ICRBD). This system can double channel capacity and improve spectrum efficiency (SE) with the reduced guard band (GB) due to the PDM. Multiple input multiple output (MIMO) technique is used to solve polarization mode dispersion (PMD) associated with channel estimation and equalization. By simulation, we demonstrate the efficacy of the proposed technique for a 2 ×40 Gbit/s 16-QAM SSB-PDM-OOFDM system according to the error vector magnitude (EVM) and the constellation diagrams.

  18. Enabling technologies for millimeter-wave radio-over-fiber systems in next generation heterogeneous mobile access networks

    NASA Astrophysics Data System (ADS)

    Zhang, Junwen; Yu, Jianjun; Wang, Jing; Xu, Mu; Cheng, Lin; Lu, Feng; Shen, Shuyi; Yan, Yan; Cho, Hyunwoo; Guidotti, Daniel; Chang, Gee-kung

    2017-01-01

    Fifth-generation (5G) wireless access network promises to support higher access data rate with more than 1,000 times capacity with respect to current long-term evolution (LTE) systems. New radio-access-technologies (RATs) based on higher carrier frequencies to millimeter-wave (MMW) radio-over-fiber, and carrier-aggregation (CA) using multi-band resources are intensively studied to support the high data rate access and effectively use of frequency resources in heterogeneous mobile network (Het-Net). In this paper, we investigate several enabling technologies for MMW RoF systems in 5G Het-Net. Efficient mobile fronthaul (MFH) solutions for 5G centralized radio access network (C-RAN) and beyond are proposed, analyzed and experimentally demonstrated based on the analog scheme. Digital predistortion based on memory polynomial for analog MFH linearization are presented with improved EVM performances and receiver sensitivity. We also propose and experimentally demonstrate a novel inter-/intra- RAT CA scheme for 5G Het- Net. The real-time standard 4G-LTE signal is carrier-aggregated with three broadband 60GHz MMW signals based on proposed optical-domain band-mapping method. RATs based on new waveforms have also been studied here to achieve higher spectral-efficiency (SE) in asynchronous environments. Full-duplex asynchronous quasi-gapless carrier aggregation scheme for MMW ROF inter-/intra-RAT based on the FBMC is also presented with 4G-LTE signals. Compared with OFDM-based signals with large guard-bands, FBMC achieves higher spectral-efficiency with better EVM performance at less received power and smaller guard-bands.

  19. A reduced successive quadratic programming strategy for errors-in-variables estimation.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tjoa, I.-B.; Biegler, L. T.; Carnegie-Mellon Univ.

    Parameter estimation problems in process engineering represent a special class of nonlinear optimization problems, because the maximum likelihood structure of the objective function can be exploited. Within this class, the errors in variables method (EVM) is particularly interesting. Here we seek a weighted least-squares fit to the measurements with an underdetermined process model. Thus, both the number of variables and degrees of freedom available for optimization increase linearly with the number of data sets. Large optimization problems of this type can be particularly challenging and expensive to solve because, for general-purpose nonlinear programming (NLP) algorithms, the computational effort increases atmore » least quadratically with problem size. In this study we develop a tailored NLP strategy for EVM problems. The method is based on a reduced Hessian approach to successive quadratic programming (SQP), but with the decomposition performed separately for each data set. This leads to the elimination of all variables but the model parameters, which are determined by a QP coordination step. In this way the computational effort remains linear in the number of data sets. Moreover, unlike previous approaches to the EVM problem, global and superlinear properties of the SQP algorithm apply naturally. Also, the method directly incorporates inequality constraints on the model parameters (although not on the fitted variables). This approach is demonstrated on five example problems with up to 102 degrees of freedom. Compared to general-purpose NLP algorithms, large improvements in computational performance are observed.« less

  20. System redesign of the immunization supply chain: Experiences from Benin and Mozambique.

    PubMed

    Prosser, Wendy; Jaillard, Philippe; Assy, Emmanuelle; Brown, Shawn T; Matsinhe, Graça; Dekoun, Mawutondji; Lee, Bruce Y

    2017-04-19

    Evidence suggests that immunization supply chains are becoming outdated and unable to deliver needed vaccines due to growing populations and new vaccine introductions. Redesigning a supply chain could result in meeting current demands. The Ministries of Health in Benin in Mozambique recognized known barriers to the immunization supply chain and undertook a system redesign to address those barriers. Changes were made to introduce an informed push system while consolidating storage points, introducing transport loops, and increasing human resource capacity for distribution. Evaluations were completed in each country. Evaluation in each country indicated improved performance of the supply chain. The Effective Vaccine Management (EVM) assessment in Benin documented notable improvements in the distribution criteria of the tool, increasing from 40% to 100% at the district level. In Mozambique, results showed reduced stockouts at health facility level from 79% at baseline to less than 1% at endline. Coverage rates of DTP3 also increased from 68.9% to 92.8%. Benin and Mozambique are undertaking system redesign in order to respond to constraints identified in the vaccine supply chain. Results and learnings show improvements in supply chain performance and make a strong case for system redesign. These countries demonstrate the feasibility of system redesign for other countries considering how to address outdated supply chains. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  1. A normal stress subgrid-scale eddy viscosity model in large eddy simulation

    NASA Technical Reports Server (NTRS)

    Horiuti, K.; Mansour, N. N.; Kim, John J.

    1993-01-01

    The Smagorinsky subgrid-scale eddy viscosity model (SGS-EVM) is commonly used in large eddy simulations (LES) to represent the effects of the unresolved scales on the resolved scales. This model is known to be limited because its constant must be optimized in different flows, and it must be modified with a damping function to account for near-wall effects. The recent dynamic model is designed to overcome these limitations but is compositionally intensive as compared to the traditional SGS-EVM. In a recent study using direct numerical simulation data, Horiuti has shown that these drawbacks are due mainly to the use of an improper velocity scale in the SGS-EVM. He also proposed the use of the subgrid-scale normal stress as a new velocity scale that was inspired by a high-order anisotropic representation model. The testing of Horiuti, however, was conducted using DNS data from a low Reynolds number channel flow simulation. It was felt that further testing at higher Reynolds numbers and also using different flows (other than wall-bounded shear flows) were necessary steps needed to establish the validity of the new model. This is the primary motivation of the present study. The objective is to test the new model using DNS databases of high Reynolds number channel and fully developed turbulent mixing layer flows. The use of both channel (wall-bounded) and mixing layer flows is important for the development of accurate LES models because these two flows encompass many characteristic features of complex turbulent flows.

  2. Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM - 13120

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schubert, A.L.

    2013-07-01

    On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation in Tennessee. UCOR will close out cleanup operations that began in 1998 under a previous contract. When the Contract Base scope of work [1] is completed in 2016, the K-25 gaseous diffusion building will have been demolished and all waste dispositioned, demolition will have started on the K-27 gaseous diffusion building, all contact-handled and remote-handled transuranic waste in inventory (approximately 500 cubic meters) will havemore » been transferred to the Transuranic Waste Processing Center, previously designated 'No-Path-To-Disposition Waste' will have been dispositioned to the extent possible, and UCOR will have managed DOE Office of Environmental Management (EM)- owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and the Y-12 National Security Complex in a safe and cost-effective manner. Since assuming its responsibilities as the ETTP cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; advanced the deactivation and demolition (D and D) of the K-25 gaseous diffusion building; recovered and completed the Tank W-1A and K-1070-B Burial Ground remediation projects; characterized, packaged, and shipped contact-handled transuranic waste to the Transuranic Waste Processing Center; disposed of more than 90,000 cubic yards of cleanup waste while managing the Environmental Management Waste Management Facility (EMWMF); and provided operations, surveillance, and maintenance activities at DOE EM facilities at ETTP, ORNL, and the Y-12 National Security Complex. Project performance as of December 31, 2012 has been excellent: - Cost Performance Index - 1.06; - Schedule Performance Index - 1.02. At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand in hand with its excellent project performance. Through calendar year 2012, UCOR's recordable injury rate was 0.33, and the company has worked close to 4 million hours without a lost work day injury. UCOR's safety record is one of the best in the DOE EM Complex. This performance was due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key approaches included: - Selected and deployed experienced staff in key leadership positions throughout the organization; - Approached 'Transition' as the 'true' beginning of the cleanup project - kicking off a number of project initiatives such as Partnering, PMB development, D and D Plan execution, etc. - Established a project baseline for performance measurement and obtained EVMS certification in record time; - Determined material differences and changed conditions that warranted contract change - then quickly addressed these changes with the DOE client; - Aligned the project and the contract within one year - also done in record time; - Implemented Safety Trained Supervisor and Safety Conscious Work Environment Programs, and kicked off the pursuit of certification under DOE's Voluntary Protection Program. (authors)« less

  3. Purification, crystallization and preliminary diffraction studies of an ectromelia virus glutaredoxin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bacik, John-Paul; Brigley, Angela M.; Channon, Lisa D.

    2005-06-01

    Ectromelia virus glutaredoxin has been crystallized in the presence of the reducing agent DTT. A diffraction data set has been collected and processed to 1.8 Å resolution. Ectromelia, vaccinia, smallpox and other closely related viruses of the orthopoxvirus genus encode a glutaredoxin gene that is not present in poxviruses outside of this genus. The vaccinia glutaredoxin O2L has been implicated as the reducing agent for ribonucleotide reductase and may thus play an important role in viral deoxyribonucleotide synthesis. As part of an effort to understand nucleotide metabolism by poxviruses, EVM053, the O2L ortholog of the ectromelia virus, has been crystallized.more » EVM053 crystallizes in space group C222{sub 1}, with unit-cell parameters a = 61.98, b = 67.57, c = 108.55 Å. Diffraction data have been processed to 1.8 Å resolution and a self-rotation function indicates that there are two molecules per asymmetric unit.« less

  4. Remote beating of parallel or orthogonally polarized dual-wavelength optical carriers for 5G millimeter-wave radio-over-fiber link.

    PubMed

    Wang, Huai-Yung; Chi, Yu-Chieh; Lin, Gong-Ru

    2016-08-08

    A novel millimeter-wave radio over fiber (MMW-RoF) link at carrier frequency of 35-GHz is proposed with the use of remotely beating MMW generation from reference master and injected slave colorless laser diode (LD) carriers at orthogonally polarized dual-wavelength injection-locking. The slave colorless LD supports lasing one of the dual-wavelength master modes with orthogonal polarizations, which facilitates the single-mode direct modulation of the quadrature amplitude modulation (QAM) orthogonal frequency division multiplexing (OFDM) data. Such an injected single-carrier encoding and coupled dual-carrier transmission with orthogonal polarization effectively suppresses the cross-heterodyne mode-beating intensity noise, the nonlinear modulation (NLM) and four-wave mixing (FWM) sidemodes during injection locking and fiber transmission. In 25-km single-mode fiber (SMF) based wireline system, the dual-carrier under single-mode encoding provides baseband 24-Gbit/s 64-QAM OFDM transmission with an error vector magnitude (EVM) of 8.8%, a bit error rate (BER) of 3.7 × 10-3, a power penalty of <1.5 dB. After remotely self-beating for wireless transmission, the beat MMW carrier at 35 GHz can deliver the passband 16-QAM OFDM at 4 Gbit/s to show corresponding EVM and BER of 15.5% and 1.4 × 10-3, respectively, after 25-km SMF and 1.6-m free-space transmission.

  5. Using 4th order Runge-Kutta method for solving a twisted Skyrme string equation

    NASA Astrophysics Data System (ADS)

    Hadi, Miftachul; Anderson, Malcolm; Husein, Andri

    2016-03-01

    We study numerical solution, especially using 4th order Runge-Kutta method, for solving a twisted Skyrme string equation. We find numerically that the value of minimum energy per unit length of vortex solution for a twisted Skyrmion string is 20.37 × 1060 eV/m.

  6. Wireless Intrusion Detection

    DTIC Science & Technology

    2007-03-01

    32 4.4 Algorithm Pseudo - Code ...................................................................................34 4.5 WIND Interface With a...difference estimates of xc temporal derivatives, or by using a polynomial fit to the previous values of xc. 34 4.4 ALGORITHM PSEUDO - CODE Pseudo ...Phase Shift Keying DQPSK Differential Quadrature Phase Shift Keying EVM Error Vector Magnitude FFT Fast Fourier Transform FPGA Field Programmable

  7. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... EVMS is required (see FAR 34.202(a)) and a pre-award IBR is contemplated, the acquisition plan must discuss— (i) How the pre-award IBR will be considered in the source selection decision; (ii) How it will... directly compensated for the costs of participating in a pre-award IBR. (4) Acquisition considerations. (i...

  8. 48 CFR 7.105 - Contents of written acquisition plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... EVMS is required (see FAR 34.202(a)) and a pre-award IBR is contemplated, the acquisition plan must discuss— (i) How the pre-award IBR will be considered in the source selection decision; (ii) How it will... directly compensated for the costs of participating in a pre-award IBR. (5) Acquisition considerations. (i...

  9. Space-division-multiplexed transmission of 3x3 multiple-input multiple-output wireless signals over conventional graded-index multimode fiber.

    PubMed

    Lei, Yi; Li, Jianqiang; Fan, Yuting; Yu, Dawei; Fu, Songnian; Yin, Feifei; Dai, Yitang; Xu, Kun

    2016-12-12

    In this paper, we experimentally demonstrate space-division-multiplexed (SDM) transmission of IEEE 802.11ac-compliant 3-spatial-stream WLAN signals over 3 spatial modes of conventional 50um graded-index (GI) multimode fiber (MMF) employing non-mode-selective 3D-waveguide photonic lantern. Two kinds of scenarios, including fiber-only transmission and fiber-wireless hybrid transmission, were investigated by measuring error vector magnitude (EVM) performance for each stream and condition number (CN) of the channel matrix. The experimental results show that, SDM-based MMF link could offer a CN< 20dB well-conditioned MIMO channel over up to 1km fiber length within 0-6GHz, achieving as low as 2.38%, 2.97% and 2.11% EVM performance for 1km MMF link at 2.4GHz, 5.8GHz, and 200m MMF link followed by 1m air distance at 2.7GHz, respectively. These results indicate the possibility to distribute wireless MIMO signals over existing in-building commercially-available MMFs with enormous cost-saving.

  10. Remote heterodyne millimeter-wave over fiber based OFDM-PON with master-to-slave injected dual-mode colorless FPLD pair.

    PubMed

    Chen, Hsiang-Yu; Chi, Yu-Chieh; Lin, Gong-Ru

    2015-08-24

    A remote heterodyne millimeter-wave (MMW) carrier at 47.7 GHz over fiber synthesized with the master-to-slave injected dual-mode colorless FPLD pair is proposed, which enables the future connection between the wired fiber-optic 64-QAM OFDM-PON at 24 Gb/s with the MMW 4-QAM OFDM wireless network at 2 Gb/s. Both the single- and dual-mode master-to-slave injection-locked colorless FPLD pairs are compared to optimize the proposed 64-QAM OFDM-PON. For the unamplified single-mode master, the slave colorless FPLD successfully performs the 64-QAM OFDM data at 24 Gb/s with EVM, SNR and BER of 8.5%, 21.5 dB and 2.9 × 10(-3), respectively. In contrast, the dual-mode master-to-slave injection-locked colorless FPLD pair with amplified and unfiltered master can transmit 64-QAM OFDM data at 18 Gb/s over 25-km SMF to provide EVM, SNR and BER of 8.2%, 21.8 dB and 2.2 × 10(-3), respectively. For the dual-mode master-to-slave injection-locked colorless FPLD pair, even though the modal dispersion occurred during 25-km SMF transmission makes it sacrifice the usable OFDM bandwidth by only 1 GHz, which guarantees the sufficient encoding bitrate for the optically generated MMW carrier to implement the fusion of MMW wireless LAN and DWDM-PON with cost-effective and compact architecture. As a result, the 47.7-GHz MMW carrier remotely beat from the dual-mode master-to-slave injection-locked colorless FPLD pair exhibits an extremely narrow bandwidth of only 0.48 MHz. After frequency down-conversion operation, the 47.7-GHz MMW carrier successfully delivers 4-QAM OFDM data up to 2 Gb/s with EVM, SNR and BER of 33.5%, 9.51 dB and 1.4 × 10(-3), respectively.

  11. The use of wild vertebrates in contemporary Spanish ethnoveterinary medicine.

    PubMed

    González, José A; Amich, Francisco; Postigo-Mota, Salvador; Vallejo, José Ramón

    2016-09-15

    This review documents the wide and varied repertoire of traditional practices based on the use of wild vertebrates in Spanish ethnoveterinary medicine (EVM) from the early 20th century to the present. Empirical practices, both ritual and magical, are recorded, and these EVM data are compared with those of other countries in the Mediterranean Region and Latin America. The data collected here could form a scientific foundation for future inventories of traditional knowledge and help in the discovery of new drugs for livestock. A qualitative systematic review of international and national databases in the fields of ethnobiology, ethnoveterinary medicine, folklore and ethnography was made. Information was obtained from more than 60 documentary sources. We recorded the use of 30 wild vertebrates and a total of 84 empirical remedies based on the use of a single species. The two most relevant zoological groups are reptiles and mammals. A wide diversity of body parts or products have been and are used. The meat and skin of snakes are the animal products most commonly used. These zootherapeutic resources have been and are used to treat or prevent ca. 50 animal diseases or conditions, in particular digestive and reproductive ailments, together with some infectious diseases. Sheep, cattle and equines form the group of domestic animals in which the greatest number of useful species are employed. In addition, many remedies and practices of the magical type are documented. In comparison with other culturally related areas, this is a rich heritage. Contemporary Spanish EVM practices amass a great richness of wild animal-based remedies. A diversity of animal parts or products have been used, offering a cultural heritage that could be a fundamental step in the discovery of new and low-cost drugs for treating livestock and alternative materials for pharmaceutical purposes. This overview contributes to the inventory of some uses and rituals seriously threatened by the progressive loss of local veterinary knowledge. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  12. Optical frequency comb based multi-band microwave frequency conversion for satellite applications.

    PubMed

    Yang, Xinwu; Xu, Kun; Yin, Jie; Dai, Yitang; Yin, Feifei; Li, Jianqiang; Lu, Hua; Liu, Tao; Ji, Yuefeng

    2014-01-13

    Based on optical frequency combs (OFC), we propose an efficient and flexible multi-band frequency conversion scheme for satellite repeater applications. The underlying principle is to mix dual coherent OFCs with one of which carrying the input signal. By optically channelizing the mixed OFCs, the converted signal in different bands can be obtained in different channels. Alternatively, the scheme can be configured to generate multi-band local oscillators (LO) for widely distribution. Moreover, the scheme realizes simultaneous inter- and intra-band frequency conversion just in a single structure and needs only three frequency-fixed microwave sources. We carry out a proof of concept experiment in which multiple LOs with 2 GHz, 10 GHz, 18 GHz, and 26 GHz are generated. A C-band signal of 6.1 GHz input to the proposed scheme is successfully converted to 4.1 GHz (C band), 3.9 GHz (C band) and 11.9 GHz (X band), etc. Compared with the back-to-back (B2B) case measured at 0 dBm input power, the proposed scheme shows a 9.3% error vector magnitude (EVM) degradation at each output channel. Furthermore, all channels satisfy the EVM limit in a very wide input power range.

  13. Analysis of Soot Propensity in Combustion Processes Using Optical Sensors and Video Magnification.

    PubMed

    Garcés, Hugo O; Fuentes, Andrés; Reszka, Pedro; Carvajal, Gonzalo

    2018-05-11

    Industrial combustion processes are an important source of particulate matter, causing significant pollution problems that affect human health, and are a major contributor to global warming. The most common method for analyzing the soot emission propensity in flames is the Smoke Point Height (SPH) analysis, which relates the fuel flow rate to a critical flame height at which soot particles begin to leave the reactive zone through the tip of the flame. The SPH and is marked by morphological changes on the flame tip. SPH analysis is normally done through flame observations with the naked eye, leading to high bias. Other techniques are more accurate, but are not practical to implement in industrial settings, such as the Line Of Sight Attenuation (LOSA), which obtains soot volume fractions within the flame from the attenuation of a laser beam. We propose the use of Video Magnification techniques to detect the flame morphological changes and thus determine the SPH minimizing observation bias. We have applied for the first time Eulerian Video Magnification (EVM) and Phase-based Video Magnification (PVM) on an ethylene laminar diffusion flame. The results were compared with LOSA measurements, and indicate that EVM is the most accurate method for SPH determination.

  14. Sit Still and Pay Attention! Trunk Movement and Attentional Resources in Infants with Typical and Delayed Development.

    PubMed

    Berger, Sarah E; Harbourne, Regina T; Guallpa Lliguichuzhca, Carmen L

    2018-02-21

    (1) examine infant movement during an early posture (sitting) utilizing a novel video assessment technique; and (2) document the differences between infants with typical development (TD), premature infants with motor delay, and infants with cerebral palsy (CP) during focused and nonfocused attention (NFA). Infants were tested when they began to sit independently. We utilized Eulerian Video Magnification (EVM) to accentuate small trunk and pelvic movements for visual coding from video taken during a natural play task with and without focused attention (FA). Trunk/pelvic movement varied as a function of both motor skill and attention. Infants with TD and CP made fewer trunk movements during periods of FA than NFA. Preterm infants exhibited more trunk/pelvic movement than the other groups and their movement did not differ based on attention type. The EVM technique allowed for replicable coding of real-time "hidden" motor adjustments from video. The capacity to minimize extraneous movements in infants, or "sitting still" may allow greater attention to the task at hand, similar to older children and adults. Premature infants' excessive trunk/pelvic movement that did not adapt to task requirements could, in the long term, impact tasks requiring attentional resources.

  15. Error vector magnitude based parameter estimation for digital filter back-propagation mitigating SOA distortions in 16-QAM.

    PubMed

    Amiralizadeh, Siamak; Nguyen, An T; Rusch, Leslie A

    2013-08-26

    We investigate the performance of digital filter back-propagation (DFBP) using coarse parameter estimation for mitigating SOA nonlinearity in coherent communication systems. We introduce a simple, low overhead method for parameter estimation for DFBP based on error vector magnitude (EVM) as a figure of merit. The bit error rate (BER) penalty achieved with this method has negligible penalty as compared to DFBP with fine parameter estimation. We examine different bias currents for two commercial SOAs used as booster amplifiers in our experiments to find optimum operating points and experimentally validate our method. The coarse parameter DFBP efficiently compensates SOA-induced nonlinearity for both SOA types in 80 km propagation of 16-QAM signal at 22 Gbaud.

  16. Experiential and authentic learning approaches in vaccine management.

    PubMed

    Kartoglu, Umit; Vesper, James; Teräs, Hanna; Reeves, Thomas

    2017-04-19

    A high level of concern is placed on the storage, handling, transportation, and distribution of vaccines and other pharmaceutical products, particularly those that are time and temperature sensitive. While active and passive cooling equipment and monitoring devices are important, it is the various personnel responsible for executing and writing procedures, designing and operating systems, and investigating problems and helping prevent them who are paramount in establishing and maintaining a "cold chain" for time and temperature sensitive pharmaceutical products (TTSPPs). These professionals must possess the required competencies, knowledge, skills and abilities so they can effectively perform these activities with appropriate levels of expertise. These are complex tasks that require the development of higher cognitive skills that cannot be adequately addressed through professional development opportunities based on simple information delivery and content acquisition. This paper describes two unique learning solutions (one on a bus called the "wheels course" and the other online called "e-learning") that have been developed by WHO Global Learning Opportunities (WHO/GLO) to provide participants with opportunities not just to learn about cold chain systems or vaccine management, but, rather, to develop high levels of expertise in their respective fields through experiential and authentic learning activities. In these interactive learning environments, participants have opportunities to address real-life situations in contexts similar to what they may face in their own work environments and develop solutions and critical thinking skills they can apply when they return to their jobs. This paper further delineates the managerial and operational vaccine management functions encompassed in these two unique learning environments. The paper also describes the alignment of the objectives addressed in the "wheels course" and the e-learning version with effective vaccine management (EVM) criteria as prescribed by WHO. The paper concludes with an example of a real world product developed by course graduates (specifically a decision tree that is now used by some national programmes). These types of products, valuable in their own right, often emerge when learning environments based on authentic learning principles are designed and implemented as they were by WHO/GLO. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  17. Estimation of turbulence characteristics of the low-level eyewall and outer-core regions in intense Hurricanes Allen (1980) and Hugo (1989)

    NASA Astrophysics Data System (ADS)

    Zhang, J. A.; Marks, F. D.; Montgomery, M.; Lorsolo, S.

    2010-12-01

    Turbulent transport processes in the atmospheric boundary layer play an important role in the intensification and maintenance of a hurricane vortex. However, direct measurement of turbulence in the hurricane boundary layer has been scarce. This study analyzes the flight-level data collected by research aircraft that penetrated the eyewalls of Category 5 Hurricane Hugo (1989) and Category 4 Hurricane Allen (1980) between 1 km and the sea surface. Momentum flux, turbulent kinetic energy (TKE) and vertical eddy diffusivity are estimated before and during the eyewall penetrations. Spatial scales of turbulent eddies are determined through spectral analysis. The turbulence parameters estimated for the eyewall penetration leg are found to be nearly an order of magnitude larger than those for the leg outside the eyewall at similar altitudes. In the low-level intense eyewall region, the horizontal length scale of dominant turbulent eddies is found to be between 500 - 3000 m and the corresponding vertical length scale is approximately 100 - 200 m. The results suggest also that it is unwise to include the eyewall vorticity maximum (EVM) in the turbulence parameter estimation, since the EVMs are likely to be quasi two-dimensional vortex structures that are embedded within the three dimensional turbulence on the inside edge of the eyewall.

  18. Analysis of Soot Propensity in Combustion Processes Using Optical Sensors and Video Magnification

    PubMed Central

    Fuentes, Andrés; Reszka, Pedro; Carvajal, Gonzalo

    2018-01-01

    Industrial combustion processes are an important source of particulate matter, causing significant pollution problems that affect human health, and are a major contributor to global warming. The most common method for analyzing the soot emission propensity in flames is the Smoke Point Height (SPH) analysis, which relates the fuel flow rate to a critical flame height at which soot particles begin to leave the reactive zone through the tip of the flame. The SPH and is marked by morphological changes on the flame tip. SPH analysis is normally done through flame observations with the naked eye, leading to high bias. Other techniques are more accurate, but are not practical to implement in industrial settings, such as the Line Of Sight Attenuation (LOSA), which obtains soot volume fractions within the flame from the attenuation of a laser beam. We propose the use of Video Magnification techniques to detect the flame morphological changes and thus determine the SPH minimizing observation bias. We have applied for the first time Eulerian Video Magnification (EVM) and Phase-based Video Magnification (PVM) on an ethylene laminar diffusion flame. The results were compared with LOSA measurements, and indicate that EVM is the most accurate method for SPH determination. PMID:29751625

  19. Towards 5G: A Photonic Based Millimeter Wave Signal Generation for Applying in 5G Access Fronthaul.

    PubMed

    Alavi, S E; Soltanian, M R K; Amiri, I S; Khalily, M; Supa'at, A S M; Ahmad, H

    2016-01-27

    5G communications require a multi Gb/s data transmission in its small cells. For this purpose millimeter wave (mm-wave) RF signals are the best solutions to be utilized for high speed data transmission. Generation of these high frequency RF signals is challenging in electrical domain therefore photonic generation of these signals is more studied. In this work, a photonic based simple and robust method for generating millimeter waves applicable in 5G access fronthaul is presented. Besides generating of the mm-wave signal in the 60 GHz frequency band the radio over fiber (RoF) system for transmission of orthogonal frequency division multiplexing (OFDM) with 5 GHz bandwidth is presented. For the purpose of wireless transmission for 5G application the required antenna is designed and developed. The total system performance in one small cell was studied and the error vector magnitude (EVM) of the system was evaluated.

  20. Towards 5G: A Photonic Based Millimeter Wave Signal Generation for Applying in 5G Access Fronthaul

    PubMed Central

    Alavi, S. E.; Soltanian, M. R. K.; Amiri, I. S.; Khalily, M.; Supa’at, A. S. M.; Ahmad, H.

    2016-01-01

    5G communications require a multi Gb/s data transmission in its small cells. For this purpose millimeter wave (mm-wave) RF signals are the best solutions to be utilized for high speed data transmission. Generation of these high frequency RF signals is challenging in electrical domain therefore photonic generation of these signals is more studied. In this work, a photonic based simple and robust method for generating millimeter waves applicable in 5G access fronthaul is presented. Besides generating of the mm-wave signal in the 60 GHz frequency band the radio over fiber (RoF) system for transmission of orthogonal frequency division multiplexing (OFDM) with 5 GHz bandwidth is presented. For the purpose of wireless transmission for 5G application the required antenna is designed and developed. The total system performance in one small cell was studied and the error vector magnitude (EVM) of the system was evaluated. PMID:26814621

  1. Towards 5G: A Photonic Based Millimeter Wave Signal Generation for Applying in 5G Access Fronthaul

    NASA Astrophysics Data System (ADS)

    Alavi, S. E.; Soltanian, M. R. K.; Amiri, I. S.; Khalily, M.; Supa'At, A. S. M.; Ahmad, H.

    2016-01-01

    5G communications require a multi Gb/s data transmission in its small cells. For this purpose millimeter wave (mm-wave) RF signals are the best solutions to be utilized for high speed data transmission. Generation of these high frequency RF signals is challenging in electrical domain therefore photonic generation of these signals is more studied. In this work, a photonic based simple and robust method for generating millimeter waves applicable in 5G access fronthaul is presented. Besides generating of the mm-wave signal in the 60 GHz frequency band the radio over fiber (RoF) system for transmission of orthogonal frequency division multiplexing (OFDM) with 5 GHz bandwidth is presented. For the purpose of wireless transmission for 5G application the required antenna is designed and developed. The total system performance in one small cell was studied and the error vector magnitude (EVM) of the system was evaluated.

  2. Mach-Zehnder modulator modulated radio-over-fiber transmission system using dual wavelength linearization

    NASA Astrophysics Data System (ADS)

    Zhu, Ran; Hui, Ming; Shen, Dongya; Zhang, Xiupu

    2017-02-01

    In this paper, dual wavelength linearization (DWL) technique is studied to suppress odd and even order nonlinearities simultaneously in a Mach-Zehnder modulator (MZM) modulated radio-over-fiber (RoF) transmission system. A theoretical model is given to analyze the DWL employed for MZM. In a single-tone test, the suppressions of the second order harmonic distortion (HD2) and third order harmonic distortion (HD3) at the same time are experimentally verified at different bias voltages of the MZM. The measured spurious-free dynamic ranges (SFDRs) with respect to the HD2 and HD3 are improved simultaneously compared to using a single laser. The output P1 dB is also improved by the DWL technique. Moreover, a WiFi signal is transmitted in the RoF system to test the linearization for broadband signal. The result shows that more than 1 dB improvement of the error vector magnitude (EVM) is obtained by the DWL technique.

  3. Spaceflight Ka-Band High-Rate Radiation-Hard Modulator

    NASA Technical Reports Server (NTRS)

    Jaso, Jeffery M.

    2011-01-01

    A document discusses the creation of a Ka-band modulator developed specifically for the NASA/GSFC Solar Dynamics Observatory (SDO). This flight design consists of a high-bandwidth, Quadriphase Shift Keying (QPSK) vector modulator with radiation-hardened, high-rate driver circuitry that receives I and Q channel data. The radiationhard design enables SDO fs Ka-band communications downlink system to transmit 130 Mbps (300 Msps after data encoding) of science instrument data to the ground system continuously throughout the mission fs minimum life of five years. The low error vector magnitude (EVM) of the modulator lowers the implementation loss of the transmitter in which it is used, thereby increasing the overall communication system link margin. The modulator comprises a component within the SDO transmitter, and meets the following specifications over a 0 to 40 C operational temperature range: QPSK/OQPSK modulator, 300-Msps symbol rate, 26.5-GHz center frequency, error vector magnitude less than or equal to 10 percent rms, and compliance with the NTIA (National Telecommunications and Information Administration) spectral mask.

  4. Centralized light-source optical access network based on polarization multiplexing.

    PubMed

    Grassi, Fulvio; Mora, José; Ortega, Beatriz; Capmany, José

    2010-03-01

    This paper presents and demonstrates a centralized light source optical access network based on optical polarization multiplexing technique. By using two optical sources emitting light orthogonally polarized in the Central Node for downstream and upstream operations, the Remote Node is kept source-free. EVM values below telecommunication standard requirements have been measured experimentally when bidirectional digital signals have been transmitted over 10 km of SMF employing subcarrier multiplexing technique in the electrical domain.

  5. Applying Acquisition Lessons Learned to Operational Energy Initiatives

    DTIC Science & Technology

    2013-03-01

    current and future platforms to meet the demands of Energy-Informed Operations. Endnotes 1 Charles F. Wald , and Tom Captain, Energy Security America’s...2013); Wald and Captain, Energy Security America’s Best Defense, 1. 3 The Army’s agile process involves seven phases and three decision points to...https://acc.dau.mil/adl/en- US/329976/file/47235/EVM_Report_to_Congress.pdf (accessed January 14, 2013). 22 Lisa Pracchia, “The AV-8B Team Learns Synergy

  6. Preparation and thermal properties of mineral-supported polyethylene glycol as form-stable composite phase change materials (CPCMs) used in asphalt pavements.

    PubMed

    Jin, Jiao; Lin, Feipeng; Liu, Ruohua; Xiao, Ting; Zheng, Jianlong; Qian, Guoping; Liu, Hongfu; Wen, Pihua

    2017-12-05

    Three kinds of mineral-supported polyethylene glycol (PEG) as form-stable composite phase change materials (CPCMs) were prepared to choose the most suitable CPCMs in asphalt pavements for the problems of asphalt pavements rutting diseases and urban heat islands. The microstructure and chemical structure of CPCMs were characterized by SEM, FT-IR and XRD. Thermal properties of the CPCMs were determined by TG and DSC. The maximum PEG absorption of diatomite (DI), expanded perlite (EP) and expanded vermiculite (EVM) could reach 72%, 67% and 73.6%, respectively. The melting temperatures and latent heat of CPCMs are in the range of 52-55 °C and 100-115 J/g, respectively. The results show that PEG/EP has the best thermal and chemical stability after 100 times of heating-cooling process. Moreover, crystallization fraction results show that PEG/EP has slightly higher latent heats than that of PEG/DI and PEG/EVM. Temperature-adjusting asphalt mixture was prepared by substituting the fine aggregates with PEG/EP CPCMs. The upper surface maximum temperature difference of temperature-adjusting asphalt mixture reaches about 7.0 °C in laboratory, and the surface peak temperature reduces up to 4.3 °C in the field experiment during a typical summer day, indicating a great potential application for regulating pavement temperature field and alleviating the urban heat islands.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burles, Kristin; Irwin, Chad R.; Burton, Robyn-Lee

    Currently, little is known about the ankyrin/F-box protein B4. Here, we report that B4R-null viruses exhibited reduced plaque size in tissue culture, and decreased ability to spread, as assessed by multiple-step growth analysis. Electron microscopy indicated that B4R-null viruses still formed mature and extracellular virions; however, there was a slight decrease of virions released into the media following deletion of B4R. Deletion of B4R did not affect the ability of the virus to rearrange actin; however, VACV811, a large vaccinia virus deletion mutant missing 55 open reading frames, had decreased ability to produce actin tails. Using ectromelia virus, a naturalmore » mouse pathogen, we demonstrated that virus devoid of EVM154, the B4R homolog, showed decreased spread to organs and was attenuated during infection. This initial characterization suggests that B4 may play a role in virus spread, and that other unidentified mediators of actin tail formation may exist in vaccinia virus. - Highlights: • B4R-null viruses show reduced plaque size, and decreased ability to spread. • B4R-null viruses formed mature and extracellular virions; and rearranged actin. • Virus devoid of EVM154, the B4R homolog, was attenuated during infection. • Initial characterization suggests that B4 may play a role in virus spread. • Unidentified mediators of actin tail formation may exist in vaccinia virus.« less

  8. Next-generation bidirectional Triple-play services using RSOA based WDM Radio on Free-Space Optics PON

    NASA Astrophysics Data System (ADS)

    Mandal, Gour Chandra; Mukherjee, Rahul; Das, Binoy; Patra, Ardhendu Sekhar

    2018-03-01

    An innovative low cost reflective semiconductor amplifier (RSOA) based bidirectional Triple-play services (TPS) using wavelength division multiplexed radio on free-space-optics passive optical network (WDM-RoFSO-PON) is proposed and experimentally demonstrated to transmit data, voice and video services simultaneously. In this paper, the TPS (10 Gb/s data/voice and 1.49 Gb/s HDTV signal) are successfully transmitted over a 500 m free-space link in downstream and RSOA is utilized at the receiving site to broadcast 1.25 Gb/s data/voice signal over same free-space link in upstream by reusing the carrier, that makes the system cost-effective. High receiver sensitivity and signal-to-noise ratio (SNR), low bit-error-rate (BER) and low error vector magnitude (EVM), and excellent eye-diagrams in our proposed network build the system more reliable and stable with acceptable performance. Therefore, proposed WDM-RoFSO-PON could be the viable solution for future ubiquitous multiservice wireless network in the scenario of TPS.

  9. SHARP's systems engineering challenge: rectifying integrated product team requirements with performance issues in an evolutionary spiral development acquisition

    NASA Astrophysics Data System (ADS)

    Kuehl, C. Stephen

    2003-08-01

    Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.

  10. Trial densities for the extended Thomas-Fermi model

    NASA Astrophysics Data System (ADS)

    Yu, An; Jimin, Hu

    1996-02-01

    A new and simplified form of nuclear densities is proposed for the extended Thomas-Fermi method (ETF) and applied to calculate the ground-state properties of several spherical nuclei, with results comparable or even better than other conventional density profiles. With the expectation value method (EVM) for microscopic corrections we checked our new densities for spherical nuclei. The binding energies of ground states almost reproduce the Hartree-Fock (HF) calculations exactly. Further applications to nuclei far away from the β-stability line are discussed.

  11. Fiber-wireless integrated mobile backhaul network based on a hybrid millimeter-wave and free-space-optics architecture with an adaptive diversity combining technique.

    PubMed

    Zhang, Junwen; Wang, Jing; Xu, Yuming; Xu, Mu; Lu, Feng; Cheng, Lin; Yu, Jianjun; Chang, Gee-Kung

    2016-05-01

    We propose and experimentally demonstrate a novel fiber-wireless integrated mobile backhaul network based on a hybrid millimeter-wave (MMW) and free-space-optics (FSO) architecture using an adaptive combining technique. Both 60 GHz MMW and FSO links are demonstrated and fully integrated with optical fibers in a scalable and cost-effective backhaul system setup. Joint signal processing with an adaptive diversity combining technique (ADCT) is utilized at the receiver side based on a maximum ratio combining algorithm. Mobile backhaul transportation of 4-Gb/s 16 quadrature amplitude modulation frequency-division multiplexing (QAM-OFDM) data is experimentally demonstrated and tested under various weather conditions synthesized in the lab. Performance improvement in terms of reduced error vector magnitude (EVM) and enhanced link reliability are validated under fog, rain, and turbulence conditions.

  12. Conductance Change Induced by the Rashba Effect in the LaAlO3/SrTiO3 Interface.

    PubMed

    Kim, Taeyueb; Kim, Shin-Ik; Baek, Seung-Hyub; Hong, Jinki; Koo, Hyun Cheol

    2015-11-01

    The LaAlO3/SrTiO3 (LAO/STO) heterostructure has an inherent space inversion asymmetry causing an internal electric field near the interface. The Rashba spin-orbit coupling arising from this structural characteristic has a considerable influence on spin transport. With application of an external magnetic field, we observed conductance change in the LAO/STO interface which depends on the sign and magnitude of the field. Our systematic study revealed that these results come from spin dependent transport, by which we obtained quantitative strength of the Rashba effect. The Rashba strength in this system depends on the temperature: it varies from 2.6 x 10(-12) eVm to negligible value in the temperature range of 1.8 K-12 K. This method for detecting Rashba effect covers a wider temperature range in comparison with those obtained from Shubnikov-de Haas oscillation or weak antilocalization measurements.

  13. Presence of herpesvirus DNA in cerebrospinal fluid of patients with tick-borne encephalitis and enteroviral meningoencephalitis.

    PubMed

    Labská, Klára; Roubalová, Kateřina; Pícha, Dušan; Marešová, Vilma

    2015-07-01

    Reactivation of HHVs in the CNS due to inflammation has not been well described yet. The primary aim of this study was to investigate the frequency of HHV DNA detection in the cerebrospinal fluid (CSF) of immunocompetent patients with meningoencephalitis of other than HHV origin. The secondary aim of this study was to evaluate the impact of herpesvirus co-infection on the clinical course and patient outcome. Ninety-six patients with clinically and laboratory proven tick-borne encephalitis (TBE) and 77 patients with a confirmed diagnosis of enteroviral meningitis (EVM), along with a control group of 107 patients without evidence of inflammation in the CSF were retrospectively tested by nested PCR for the presence of DNA of the neurotropic herpesviruses HSV1, HSV2, VZV, and HHV6 in the CSF. The clinical course, laboratory tests, antiviral treatment, and neurological complications in a 6-month follow-up were compared between the groups positive or negative for HHV DNA in the CSF. HHV DNA was found in the CSF of 12 (6.9%) patients (6.3% and 7.8% in the TBE and EVM groups, respectively) and in 1 (0.9%) control patient. None of the patients had recent blisters or rash. The clinical course was comparably mild in all patients. No permanent neurological sequelae were observed. Only the CSF total protein level was significantly higher in HHV DNA-positive than in HHV-negative patients. © 2015 Wiley Periodicals, Inc.

  14. High-fidelity and low-latency mobile fronthaul based on segment-wise TDM and MIMO-interleaved arraying.

    PubMed

    Li, Longsheng; Bi, Meihua; Miao, Xin; Fu, Yan; Hu, Weisheng

    2018-01-22

    In this paper, we firstly demonstrate an advanced arraying scheme in the TDM-based analog mobile fronthaul system to enhance the signal fidelity, in which the segment of the antenna carrier signal (AxC) with an appropriate length is served as the granularity for TDM aggregation. Without introducing extra processing, the entire system can be realized by simple DSP. The theoretical analysis is presented to verify the feasibility of this scheme, and to evaluate its effectiveness, the experiment with ~7-GHz bandwidth and 20 8 × 8 MIMO group signals are conducted. Results show that the segment-wise TDM is completely compatible with the MIMO-interleaved arraying, which is employed in an existing TDM scheme to improve the bandwidth efficiency. Moreover, compared to the existing TDM schemes, our scheme can not only satisfy the latency requirement of 5G but also significantly reduce the multiplexed signal bandwidth, hence providing higher signal fidelity in the bandwidth-limited fronthaul system. The experimental result of EVM verifies that 256-QAM is supportable using the segment-wise TDM arraying with only 250-ns latency, while with the ordinary TDM arraying, only 64-QAM is bearable.

  15. 450-nm GaN laser diode enables high-speed visible light communication with 9-Gbps QAM-OFDM.

    PubMed

    Chi, Yu-Chieh; Hsieh, Dan-Hua; Tsai, Cheng-Ting; Chen, Hsiang-Yu; Kuo, Hao-Chung; Lin, Gong-Ru

    2015-05-18

    A TO-38-can packaged Gallium nitride (GaN) blue laser diode (LD) based free-space visible light communication (VLC) with 64-quadrature amplitude modulation (QAM) and 32-subcarrier orthogonal frequency division multiplexing (OFDM) transmission at 9 Gbps is preliminarily demonstrated over a 5-m free-space link. The 3-dB analog modulation bandwidth of the TO-38-can packaged GaN blue LD biased at 65 mA and controlled at 25°C is only 900 MHz, which can be extended to 1.5 GHz for OFDM encoding after throughput intensity optimization. When delivering the 4-Gbps 16-QAM OFDM data within 1-GHz bandwidth, the error vector magnitude (EVM), signal-to-noise ratio (SNR) and bit-error-rate (BER) of the received data are observed as 8.4%, 22.4 dB and 3.5 × 10(-8), respectively. By increasing the encoded bandwidth to 1.5 GHz, the TO-38-can packaged GaN blue LD enlarges its transmission capacity to 6 Gbps but degrades its transmitted BER to 1.7 × 10(-3). The same transmission capacity of 6 Gbps can also be achieved with a BER of 1 × 10(-6) by encoding 64-QAM OFDM data within 1-GHz bandwidth. Using the 1.5-GHz full bandwidth of the TO-38-can packaged GaN blue LD provides the 64-QAM OFDM transmission up to 9 Gbps, which successfully delivers data with an EVM of 5.1%, an SNR of 22 dB and a BER of 3.6 × 10(-3) passed the forward error correction (FEC) criterion.

  16. Multi-purpose greenhouse of changeable geometry (MGCG)

    NASA Astrophysics Data System (ADS)

    Kordium, V.; Kornejchuk, A.

    In the frames of scientific program of National Cosmic Agency of Ukraine the multipurpose greenhouse is being developed. It is destined for the performance of biological and biotechnological experiments as well as for planting of fast growing vegetable cultures for crew ration enrichment and positive psychological influence under the conditions of long-term flight in the international space station or in other cosmic flying objects. Main principle of greenhouse arrangement is the existence of unified modules. Their sets and combinations permit to form executively different space greenhouse configurations. The minimal structural greenhouse unit suitable either for construction of total configuration or for autonomous functioning, is a carrying composite platform (CCP). The experimental vegetative module (EVM) and the module, supporting microclimate needed inside EVM, are launched to CCP. The amount of these modules and their configuration depend on quantity and complexity of tasks to be solved as well as on duration of their performance. These modules form the experimental block. Four modules of much larger sizes, which form experimentally technological block, are used for further studies of objectives approved in the experimental block. The technologies developed for growing plants are used in the third, technological block, which is a one large vegetative module. All three greenhouse blocks can be changed in their sizes in three dimensions, and function either in a complete greenhouse structure, or autonomously. The control is performed from a board computer, or, if necessary, it is governed with automation devices placed on a front panel of blocks. All three blocks are pulled out along the directing base into the station passage, and this makes free access to the base modules, convenient work with them, and à good survey.

  17. All-optical and broadband microwave fundamental/sub-harmonic I/Q down-converters.

    PubMed

    Gao, Yongsheng; Wen, Aijun; Jiang, Wei; Fan, Yangyu; He, You

    2018-03-19

    Microwave I/Q down-converters are frequently used in image-reject super heterodyne receivers, zero intermediate frequency (zero-IF) receivers, and phase/frequency discriminators. However, due to the electronic bottleneck, conventional microwave I/Q mixers face a serious bandwidth limitation, I/Q imbalance, and even-order distortion. In this paper, photonic microwave fundamental and sub-harmonic I/Q down-converters are presented using a polarization division multiplexing dual-parallel Mach-Zehnder modulator (PDM-DPMZM). Thanks to all-optical manipulation, the proposed system features an ultra-wide operating band (7-40 GHz in the fundamental I/Q down-converter, and 10-40 GHz in the sub-harmonic I/Q down-converter) and an excellent I/Q balance (maximum 0.7 dB power imbalance and 1 degree phase imbalance). The conversion gain, noise figure (NF), even-order distortion, and spurious free dynamic range (SFDR) are also improved by LO power optimization and balanced detection. Using the proposed system, a high image rejection ratio is demonstrated for a super heterodyne receiver, and good EVMs over a wide RF power range is demonstrated for a zero-IF receiver. The proposed broadband photonic microwave fundamental and sub-harmonic I/Q down-converters may find potential applications in multi-band satellite, ultra-wideband radar and frequency-agile electronic warfare systems.

  18. Parallel PWMs Based Fully Digital Transmitter with Wide Carrier Frequency Range

    PubMed Central

    Zhou, Bo; Zhang, Kun; Zhou, Wenbiao; Zhang, Yanjun; Liu, Dake

    2013-01-01

    The carrier-frequency (CF) and intermediate-frequency (IF) pulse-width modulators (PWMs) based on delay lines are proposed, where baseband signals are conveyed by both positions and pulse widths or densities of the carrier clock. By combining IF-PWM and precorrected CF-PWM, a fully digital transmitter with unit-delay autocalibration is implemented in 180 nm CMOS for high reconfiguration. The proposed architecture achieves wide CF range of 2 M–1 GHz, high power efficiency of 70%, and low error vector magnitude (EVM) of 3%, with spectrum purity of 20 dB optimized in comparison to the existing designs. PMID:24223503

  19. WDM-PON access network with lightwave source centralized full-duplex link based on SSB-OOFDM for wired and 60 GHz band wireless alternative accesses

    NASA Astrophysics Data System (ADS)

    Ma, Jianxin; Wang, Zhao; Zheng, Guoli

    2014-04-01

    A novel lightwave centralized full-duplex WDM-PON access network based on single sideband optical orthogonal frequency-division multiplexing (SSB-OOFDM) is proposed for providing wired and 60-GHz band wireless accesses alternately. At the OLT, the multi-channels with 10-Gb/s 4-QAM-RF-OFDM signals are SSB modulated on the optical local oscillators (OLOs). At the RN, one OOFDM signal along with two OLOs is abstracted and switched to the corresponding HONU, where the signal can be downconverted to the 10-GHz or 60-GHz band RF-OFDM signal by one OLO for wired or wireless access, while the other one is used to bear the uplink signal. Since the HONU is free from the light sources, the system complexity and cost are reduced. Full duplex transmission over 25 km fiber have been demonstrated that the error vector magnitude (EVM) of the down- and up-link signals are much below the FEC limit for both the wired and 60-GHz band wireless access services.

  20. An experimental study on digital predistortion for radio-over-fiber links

    NASA Astrophysics Data System (ADS)

    Vieira, Luis C.; Gomes, Nathan J.; Nkansah, Anthony

    2010-12-01

    Radio-over-fiber (RoF) has been proposed as an enabling technology for broadband networks, such as WiMAX and WiFi. Besides the inherent high bandwidth and reliability of RoF systems, they also allow the reduction of installation and maintenance cost of the remote antenna units (RAUs) and improvement in the coverage area of the base station/access point. However, the nonlinear distortion of the optical link, which stems mainly from the laser diode, may impose serious limitations on the system performance, especially when high PAPR, wideband signals are used. Thus, distortion compensation is a key issue in order to facilitate the application of the RoF technology for broadband networks. In this work, digital predistortion for directly modulated RoF links is experimentally investigated. A memory-polynomial- based predistorter model is identified from measurements of the baseband OFDM input-output signals and through the use of an indirect learning architecture. Then, a predistorted signal is generated and fed to the RoF link for comparing its output with that of the non-predistorted one. As a result of this compensation technique, an improvement of the static link linearity and the output constellation diagram has been found, with an EVM reduction of 1.73 %.

  1. Stress and stability of plate-screw fixation and screw fixation in the treatment of Schatzker type IV medial tibial plateau fracture: a comparative finite element study.

    PubMed

    Huang, Xiaowei; Zhi, Zhongzheng; Yu, Baoqing; Chen, Fancheng

    2015-11-25

    The purpose of this study is to compare the stress and stability of plate-screw fixation and screw fixation in the treatment of Schatzker type IV medial tibial plateau fracture. A three-dimensional (3D) finite element model of the medial tibial plateau fracture (Schatzker type IV fracture) was created. An axial force of 2500 N with a distribution of 60% to the medial compartment was applied to simulate the axial compressive load on an adult knee during single-limb stance. The equivalent von Mises stress, displacement of the model relative to the distal tibia, and displacement of the implants were used as the output measures. The mean stress value of the plate-screw fixation system was 18.78 MPa, which was significantly (P < 0.001) smaller than that of the screw fixation system. The maximal value of displacement (sum) in the plate-screw fixation system was 2.46 mm, which was lower than that in the screw fixation system (3.91 mm). The peak stress value of the triangular fragment in the plate-screw fixation system model was 42.04 MPa, which was higher than that in the screw fixation model (24.18 MPa). But the mean stress of the triangular fractured fragment in the screw fixation model was significantly higher in terms of equivalent von Mises stress (EVMS), x-axis, and z-axis (P < 0.001). This study demonstrated that the load transmission mechanism between plate-screw fixation system and screw fixation system was different and the stability provided by the plate-screw fixation system was superior to the screw fixation system.

  2. A Fully Integrated Sensor SoC with Digital Calibration Hardware and Wireless Transceiver at 2.4 GHz

    PubMed Central

    Kim, Dong-Sun; Jang, Sung-Joon; Hwang, Tae-Ho

    2013-01-01

    A single-chip sensor system-on-a-chip (SoC) that implements radio for 2.4 GHz, complete digital baseband physical layer (PHY), 10-bit sigma-delta analog-to-digital converter and dedicated sensor calibration hardware for industrial sensing systems has been proposed and integrated in a 0.18-μm CMOS technology. The transceiver's building block includes a low-noise amplifier, mixer, channel filter, receiver signal-strength indicator, frequency synthesizer, voltage-controlled oscillator, and power amplifier. In addition, the digital building block consists of offset quadrature phase-shift keying (OQPSK) modulation, demodulation, carrier frequency offset compensation, auto-gain control, digital MAC function, sensor calibration hardware and embedded 8-bit microcontroller. The digital MAC function supports cyclic redundancy check (CRC), inter-symbol timing check, MAC frame control, and automatic retransmission. The embedded sensor signal processing block consists of calibration coefficient calculator, sensing data calibration mapper and sigma-delta analog-to-digital converter with digital decimation filter. The sensitivity of the overall receiver and the error vector magnitude (EVM) of the overall transmitter are −99 dBm and 18.14%, respectively. The proposed calibration scheme has a reduction of errors by about 45.4% compared with the improved progressive polynomial calibration (PPC) method and the maximum current consumption of the SoC is 16 mA. PMID:23698271

  3. Finite element analysis of intramedullary nailing and double locking plate for treating extra-articular proximal tibial fractures.

    PubMed

    Chen, Fancheng; Huang, Xiaowei; Ya, Yingsun; Ma, Fenfen; Qian, Zhi; Shi, Jifei; Guo, Shuolei; Yu, Baoqing

    2018-01-16

    Proximal tibia fractures are one of the most familiar fractures. Surgical approaches are usually needed for anatomical reduction. However, no single treatment method has been widely established as the standard care. Our present study aims to compare the stress and stability of intramedullary nails (IMN) fixation and double locking plate (DLP) fixation in the treatment of extra-articular proximal tibial fractures. A three-dimensional (3D) finite element model of the extra-articular proximal tibial fracture, whose 2-cm bone gap began 7 cm from the tibial plateau articular surface, was created fixed by different fixation implants. The axial compressive load on an adult knee during single-limb stance was imitated by an axial force of 2500 N with a distribution of 60% to the medial compartment, while the distal end was fixed effectively. The equivalent von Mises stress and displacement of the model was used as the output measures for analysis. The maximal equivalent von Mises stress value of the system in the IMN model was 293.23 MPa, which was higher comparing against that in the DLP fixation model (147.04 MPa). And the mean stress of the model in the IMN model (9.25 MPa) was higher than that of the DLP fixation system in terms of equivalent von Mises stress (EVMS) (P < 0.0001). The maximal value of displacement (sum) in the IMN system was 8.82 mm, which was lower than that in the DLP fixation system (9.48 mm). This study demonstrated that the stability provided by the locking plate fixation system was superior to the intramedullary nails fixation system and served as an alternative fixation for the extra-articular proximal tibial fractures of young patients.

  4. Experimental demonstration of OFDM/OQAM transmission with DFT-based channel estimation for visible laser light communications

    NASA Astrophysics Data System (ADS)

    He, Jing; Shi, Jin; Deng, Rui; Chen, Lin

    2017-08-01

    Recently, visible light communication (VLC) based on light-emitting diodes (LEDs) is considered as a candidate technology for fifth-generation (5G) communications, VLC is free of electromagnetic interference and it can simplify the integration of VLC into heterogeneous wireless networks. Due to the data rates of VLC system limited by the low pumping efficiency, small output power and narrow modulation bandwidth, visible laser light communication (VLLC) system with laser diode (LD) has paid more attention. In addition, orthogonal frequency division multiplexing/offset quadrature amplitude modulation (OFDM/OQAM) is currently attracting attention in optical communications. Due to the non-requirement of cyclic prefix (CP) and time-frequency domain well-localized pulse shapes, it can achieve high spectral efficiency. Moreover, OFDM/OQAM has lower out-of-band power leakage so that it increases the system robustness against inter-carrier interference (ICI) and frequency offset. In this paper, a Discrete Fourier Transform (DFT)-based channel estimation scheme combined with the interference approximation method (IAM) is proposed and experimentally demonstrated for VLLC OFDM/OQAM system. The performance of VLLC OFDM/OQAM system with and without DFT-based channel estimation is investigated. Moreover, the proposed DFT-based channel estimation scheme and the intra-symbol frequency-domain averaging (ISFA)-based method are also compared for the VLLC OFDM/OQAM system. The experimental results show that, the performance of EVM using the DFT-based channel estimation scheme is improved about 3dB compared with the conventional IAM method. In addition, the DFT-based channel estimation scheme can resist the channel noise effectively than that of the ISFA-based method.

  5. 480 Mbit/s UWB bi-directional radio over fiber CWDM PON using ultra-low cost and power VCSELs.

    PubMed

    Quinlan, Terence; Morant, Maria; Dudley, Sandra; Llorente, Roberto; Walker, Stuart

    2011-12-12

    Radio-over-fiber (RoF) schemes offer the possibility of permitting direct access to native format services for the domestic user. A low power requirement and cost effectiveness are crucial to both the service provider and the end user. Here, we present an ultra-low cost and power RoF scheme using direct modulation of commercially-available 1344 nm and 1547 nm VCSELs by band-group 1 UWB wireless signals (ECMA-368) at near broadcast power levels. As a result, greatly simplified electrical-optical-electrical conversion is accomplished. A successful demonstration over a transmission distance of 20.1 km is described using a SSMF, CWDM optical network. EVMs of better than -18.3 dB were achieved. © 2011 Optical Society of America

  6. Coherent correlator and equalizer using a reconfigurable all-optical tapped delay line.

    PubMed

    Chitgarha, Mohammad Reza; Khaleghi, Salman; Yilmaz, Omer F; Tur, Moshe; Haney, Michael W; Langrock, Carsten; Fejer, Martin M; Willner, Alan E

    2013-07-01

    We experimentally demonstrate a reconfigurable optical tapped delay line in conjunction with coherent detection to search multiple patterns among quadrature phase shift keying (QPSK) symbols in 20 Gbaud data channel and also to equalize 20 and 31 Gbaud QPSK, 20 Gbaud 8 phase shift keying (PSK), and 16 QAM signals. Multiple patterns are searched successfully on QPSK signals, and correlation peaks are obtained at the matched patterns. QPSK, 8 PSK, and 16 QAM signals are also successfully recovered after 25 km of SMF-28 with average EVMs of 8.3%, 8.9%, and 7.8%. A penalty of <1 dB optical signal to noise penalty is achieved for a 20 Gbaud QPSK signal distorted by up to 400  ps/nm dispersion.

  7. Analysis of the possibility of a PGA309 integrated circuit application in pressure sensors

    NASA Astrophysics Data System (ADS)

    Walendziuk, Wojciech; Baczewski, Michal; Idzkowski, Adam

    2016-09-01

    This article present the results of research concerning the analysis of the possibilities of applying a PGA309 integrated circuit in transducers used for pressure measurement. The experiments were done with the use of a PGA309EVM-USB evaluation circuit with a BD|SENSORS pressure sensor. A specially prepared MATLAB script was used in the process of the calibration setting choice and the results analysis. The article discusses the worked out algorithm that processes the measurement results, i.e. the algorithm which calculates the desired gain and the offset adjustment voltage of the transducer measurement bridge in relation to the input signal range of the integrated circuit and the temperature of the environment (temperature compensation). The checking procedure was conducted in a measurement laboratory and the obtained result were analyzed and discussed.

  8. Advances in the NASA Earth Science Division Applied Science Program

    NASA Astrophysics Data System (ADS)

    Friedl, L.; Bonniksen, C. K.; Escobar, V. M.

    2016-12-01

    The NASA Earth Science Division's Applied Science Program advances the understanding of and ability to used remote sensing data in support of socio-economic needs. The integration of socio-economic considerations in to NASA Earth Science projects has advanced significantly. The large variety of acquisition methods used has required innovative implementation options. The integration of application themes and the implementation of application science activities in flight project is continuing to evolve. The creation of the recently released Earth Science Division, Directive on Project Applications Program and the addition of an application science requirement in the recent EVM-2 solicitation document NASA's current intent. Continuing improvement in the Earth Science Applications Science Program are expected in the areas of thematic integration, Project Applications Program tailoring for Class D missions and transfer of knowledge between scientists and projects.

  9. Dynamic Responses of Flexible Cylinders with Low Mass Ratio

    NASA Astrophysics Data System (ADS)

    Olaoye, Abiodun; Wang, Zhicheng; Triantafyllou, Michael

    2017-11-01

    Flexible cylinders with low mass ratios such as composite risers are attractive in the offshore industry because they require lower top tension and are less likely to buckle under self-weight compared to steel risers. However, their relatively low stiffness characteristics make them more vulnerable to vortex induced vibrations. Additionally, numerical investigation of the dynamic responses of such structures based on realistic conditions is limited by high Reynolds number, complex sheared flow profile, large aspect ratio and low mass ratio challenges. In the framework of Fourier spectral/hp element method, the current technique employs entropy-viscosity method (EVM) based large-eddy simulation approach for flow solver and fictitious added mass method for structure solver. The combination of both methods can handle fluid-structure interaction problems at high Reynolds number with low mass ratio. A validation of the numerical approach is provided by comparison with experiments.

  10. Hydrodynamics of primordial black hole formation

    NASA Technical Reports Server (NTRS)

    Nadezhin, D. K.; Novikov, I. D.; Polnarev, A. G.

    1979-01-01

    The hydrodynamic picture of the formation of primordial black holes (PBH) at the early stages of expansion of the Universe is considered. It is assumed that close to singularity, expansion occurs in a quasi-isotropic way. Using an EVM, a spherically symmetrical nonlinear problem of the evolution of primary strong deviation from the Fridman solution was solved. What these deviations must be, so that the formation of PBH occurred was clarified. Attention was devoted to the role of pressure gradients. It is pointed out that at the moment of formation of PBH, only a small part of matter enters into it, primarily the component of perturbation. It is also pointed out that at this moment, the mass of PBH essentially is smaller than the mass considered within the cosmic horizon. The possibility of changing the mass of the PBH as a result of accretion is analyzed.

  11. Heart Rate Detection Using Microsoft Kinect: Validation and Comparison to Wearable Devices.

    PubMed

    Gambi, Ennio; Agostinelli, Angela; Belli, Alberto; Burattini, Laura; Cippitelli, Enea; Fioretti, Sandro; Pierleoni, Paola; Ricciuti, Manola; Sbrollini, Agnese; Spinsante, Susanna

    2017-08-02

    Contactless detection is one of the new frontiers of technological innovation in the field of healthcare, enabling unobtrusive measurements of biomedical parameters. Compared to conventional methods for Heart Rate (HR) detection that employ expensive and/or uncomfortable devices, such as the Electrocardiograph (ECG) or pulse oximeter, contactless HR detection offers fast and continuous monitoring of heart activities and provides support for clinical analysis without the need for the user to wear a device. This paper presents a validation study for a contactless HR estimation method exploiting RGB (Red, Green, Blue) data from a Microsoft Kinect v2 device. This method, based on Eulerian Video Magnification (EVM), Photoplethysmography (PPG) and Videoplethysmography (VPG), can achieve performance comparable to classical approaches exploiting wearable systems, under specific test conditions. The output given by a Holter, which represents the gold-standard device used in the test for ECG extraction, is considered as the ground-truth, while a comparison with a commercial smartwatch is also included. The validation process is conducted with two modalities that differ for the availability of a priori knowledge about the subjects' normal HR. The two test modalities provide different results. In particular, the HR estimation differs from the ground-truth by 2% when the knowledge about the subject's lifestyle and his/her HR is considered and by 3.4% if no information about the person is taken into account.

  12. Heart Rate Detection Using Microsoft Kinect: Validation and Comparison to Wearable Devices

    PubMed Central

    Agostinelli, Angela; Belli, Alberto; Cippitelli, Enea; Fioretti, Sandro; Pierleoni, Paola; Ricciuti, Manola

    2017-01-01

    Contactless detection is one of the new frontiers of technological innovation in the field of healthcare, enabling unobtrusive measurements of biomedical parameters. Compared to conventional methods for Heart Rate (HR) detection that employ expensive and/or uncomfortable devices, such as the Electrocardiograph (ECG) or pulse oximeter, contactless HR detection offers fast and continuous monitoring of heart activities and provides support for clinical analysis without the need for the user to wear a device. This paper presents a validation study for a contactless HR estimation method exploiting RGB (Red, Green, Blue) data from a Microsoft Kinect v2 device. This method, based on Eulerian Video Magnification (EVM), Photoplethysmography (PPG) and Videoplethysmography (VPG), can achieve performance comparable to classical approaches exploiting wearable systems, under specific test conditions. The output given by a Holter, which represents the gold-standard device used in the test for ECG extraction, is considered as the ground-truth, while a comparison with a commercial smartwatch is also included. The validation process is conducted with two modalities that differ for the availability of a priori knowledge about the subjects’ normal HR. The two test modalities provide different results. In particular, the HR estimation differs from the ground-truth by 2% when the knowledge about the subject’s lifestyle and his/her HR is considered and by 3.4% if no information about the person is taken into account. PMID:28767091

  13. Implementing health promotion activities using community-engaged approaches in Asian American faith-based organizations in New York City and New Jersey.

    PubMed

    Kwon, S C; Patel, S; Choy, C; Zanowiak, J; Rideout, C; Yi, S; Wyatt, L; Taher, M D; Garcia-Dia, M J; Kim, S S; Denholm, T K; Kavathe, R; Islam, N S

    2017-09-01

    Faith-based organizations (FBOs) (e.g., churches, mosques, and gurdwaras) can play a vital role in health promotion. The Racial and Ethnic Approaches to Community Health for Asian Americans (REACH FAR) Project is implementing a multi-level and evidence-based health promotion and hypertension (HTN) control program in faith-based organizations serving Asian American (AA) communities (Bangladeshi, Filipino, Korean, Asian Indian) across multiple denominations (Christian, Muslim, and Sikh) in New York/New Jersey (NY/NJ). This paper presents baseline results and describes the cultural adaptation and implementation process of the REACH FAR program across diverse FBOs and religious denominations serving AA subgroups. Working with 12 FBOs, informed by implementation research and guided by a cultural adaptation framework and community-engaged approaches, REACH FAR strategies included (1) implementing healthy food policies for communal meals and (2) delivering a culturally-linguistically adapted HTN management coaching program. Using the Ecological Validity Model (EVM), the program was culturally adapted across congregation and faith settings. Baseline measures include (i) Congregant surveys assessing social norms and diet (n = 946), (ii) HTN participant program surveys (n = 725), (iii) FBO environmental strategy checklists (n = 13), and (iv) community partner in-depth interviews assessing project feasibility (n = 5). We describe the adaptation process and baseline assessments of FBOs. In year 1, we reached 3790 (nutritional strategies) and 725 (HTN program) via AA FBO sites. Most AA FBOs lack nutrition policies and present prime opportunities for evidence-based multi-level interventions. REACH FAR presents a promising health promotion implementation program that may result in significant community reach.

  14. Rapidly reconfigurable high-fidelity optical arbitrary waveform generation in heterogeneous photonic integrated circuits.

    PubMed

    Feng, Shaoqi; Qin, Chuan; Shang, Kuanping; Pathak, Shibnath; Lai, Weicheng; Guan, Binbin; Clements, Matthew; Su, Tiehui; Liu, Guangyao; Lu, Hongbo; Scott, Ryan P; Ben Yoo, S J

    2017-04-17

    This paper demonstrates rapidly reconfigurable, high-fidelity optical arbitrary waveform generation (OAWG) in a heterogeneous photonic integrated circuit (PIC). The heterogeneous PIC combines advantages of high-speed indium phosphide (InP) modulators and low-loss, high-contrast silicon nitride (Si3N4) arrayed waveguide gratings (AWGs) so that high-fidelity optical waveform syntheses with rapid waveform updates are possible. The generated optical waveforms spanned a 160 GHz spectral bandwidth starting from an optical frequency comb consisting of eight comb lines separated by 20 GHz channel spacing. The Error Vector Magnitude (EVM) values of the generated waveforms were approximately 16.4%. The OAWG module can rapidly and arbitrarily reconfigure waveforms upon every pulse arriving at 2 ns repetition time. The result of this work indicates the feasibility of truly dynamic optical arbitrary waveform generation where the reconfiguration rate or the modulator bandwidth must exceed the channel spacing of the AWG and the optical frequency comb.

  15. Receiver sensitivity improvement in spectrally-efficient guard-band twin-SSB-OFDM using an optical IQ modulator

    NASA Astrophysics Data System (ADS)

    Chen, Ming; Peng, Miao; Zhou, Hui; Zheng, Zhiwei; Tang, Xionggui; Maivan, Lap

    2017-12-01

    To further improve receiver sensitivity of spectrally-efficient guard-band direct-detection optical orthogonal frequency-division multiplexing (OFDM) with twin single-side-band (SSB) modulation technique, an optical IQ modulator (IQM) is employed to optimize optical carrier-to-signal power ratio (CSPR). The CSPRs for the guard-band twin-SSB-OFDM signal generated by using dual-drive Mach-Zehnder modulator (DD-MZM) and optical IQM are theoretically analyzed and supported by simulations. The optimal CSPR for the two types of guard-band twin-SSB-OFDM are identified. The simulations exhibit that the error vector magnitude (EVM) performance of the IQM-enabled guard-band twin-SSB-OFDM is improved by more than 4-dB compared to that of the twin-SSB-OFDM enabled by DD-MZM after 80-km single-mode fiber (SMF) transmission. In addition, more than 3-dB and 10 dB receiver sensitivity improvements in terms of received optical power (ROP) and optical signal-to-noise ratio (OSNR) are also achieved, respectively.

  16. A highly linear power amplifier for WLAN

    NASA Astrophysics Data System (ADS)

    Jie, Jin; Jia, Shi; Baoli, Ai; Xuguang, Zhang

    2016-02-01

    A three-stage power amplifier (PA) for WLAN application in 2.4-2.5 GHz is presented. The proposed PA employs an adaptive bias circuit to adjust the operating point of the PA to improve the linearity of the PA. Two methods to short the 2nd harmonic circuit are compared in the area of efficiency and gain of the PA. The PA is taped out in the process of 2 μm InGaP/GaAs HBT and is tested by the evaluation board. The measured results show that 31.5 dB power gain and 29.3 dBm P1dB with an associated 40.4% power added efficiency (PAE) under the single tone stimulus. Up to 26.5 dBm output power can be achieved with an error vector magnitude (EVM) of lower than 3% under the 64QAM/OFDM WLAN stimulus. Project supported by the National Natural Science Foundation of China (No. 61201244) and the Natural Science Fund of SUES (No. E1-0501-14-0168).

  17. Local knowledge held by farmers in Eastern Tyrol (Austria) about the use of plants to maintain and improve animal health and welfare.

    PubMed

    Vogl, Christian R; Vogl-Lukasser, Brigitte; Walkenhorst, Michael

    2016-09-12

    The sustainable management of animal health and welfare is of increasing importance to consumers and a key topic in the organic farming movement. Few systematic studies have been undertaken investigating farmers' local knowledge related to this issue. Ethnoveterinary medicine (EVM) is a discipline focusing on local knowledge and folk methods in veterinary medicine, however most ethnoveterinarian studies primarily address the treatment of animal diseases. Very few studies have explored prophylactic methods. An ethnoveterinary research project in Eastern Tyrol (Austria) was conducted in 2004 and 2005 to gather information about local knowledge of animal husbandry from 144 informants, with the emphasis on plants that maintain livestock health and welfare. Informants mentioned a total of 87 plants and 22 plant-based generic terms in the context of maintaining and improving livestock health and welfare. The most important preventive measures for maintaining and improving animal health and welfare were practices related to "fodder" and "feeding". In this category the plants mentioned could be grouped according to three different perceptions about their effect on animals: "Good or bad fodder", "Functional fodder" and "Fodder medicine". In addition to fodder, environmental management, the human-animal relationship, household remedies and cultural/religious activities were also mentioned. When asked about practices in the past that maintained animal health and well-being, interviewees mentioned, for example, the importance of the diversity of sources that used to be available to obtain feed and fodder. The informants' approach that feeding is central to livestock welfare is in line with the standard scientific literature on animal health, including in organic farming. Various scientific studies into common fodder evaluate the nutritive and dietary value, efficiency and safety of fodder. Future studies also have to consider the evaluation of traditional, local fodder resources. In fact, the value of 'food as medicine' for humans in the context of local knowledge has been widely assessed, but the potential health benefits of fodder and nutraceuticals in local and traditional ethnoveterinary methods require further attention.

  18. Radio over fiber transceiver employing phase modulation of an optical broadband source.

    PubMed

    Grassi, Fulvio; Mora, José; Ortega, Beatriz; Capmany, José

    2010-10-11

    This paper proposes a low-cost RoF transceiver for multichannel SCM/WDM signal distribution suitable for future broadband access networks. The transceiver is based on the phase modulation of an optical broadband source centered at third transmission window. Prior to phase modulation the optical broadband source output signal is launched into a Mach-Zehnder interferometer structure, as key device enabling radio signals propagation over the optical link. Furthermore, an optical CWDM is employed to create a multichannel scenario by performing the spectral slicing of the modulated optical signal into a number of channels each one conveying the information from the central office to different base stations. The operation range is up to 20 GHz with a modulation bandwidth around of 500 MHz. Experimental results of the transmission of SCM QPSK and 64-QAM data through 20 Km of SMF exhibit good EVM results in the operative range determined by the phase-to-intensity conversion process. The proposed approach shows a great suitability for WDM networks based on RoF signal transport and also represents a cost-effective solution for passive optical networks.

  19. Hole mobilities and the effective Hall factor in p-type GaAs

    NASA Astrophysics Data System (ADS)

    Wenzel, M.; Irmer, G.; Monecke, J.; Siegel, W.

    1997-06-01

    We prove the effective Hall factor in p-GaAs to be larger than values discussed in the literature up to now. The scattering rates for the relevant scattering mechanisms in p-GaAs have been recalculated after critical testing the existing models. These calculations allow to deduce theoretical drift and theoretical Hall mobilities as functions of temperature which can be compared with measured data. Theoretical Hall factors in the heavy and light hole bands and an effective Hall factor result. The calculated room temperature values of the drift mobility and of the effective Hall factor are 118 cm2/V s and 3.6, respectively. The fitted acoustic deformation potential E1=7.9 eV and the fitted optical coupling constant DK=1.24×1011 eV/m are close to values published before. It is shown that the measured strong dependence of the Hall mobility on the Hall concentration is not mainly caused by scattering by ionized impurities but by the dependence of the effective Hall factor on the hole concentration.

  20. Coherently wavelength injection-locking a 600-μm long cavity colorless laser diode for 16-QAM OFDM at 12 Gbit/s over 25-km SMF.

    PubMed

    Li, Yi-Cheng; Chi, Yu-Chieh; Cheng, Min-Chi; Lu, I-Cheng; Chen, Jason; Lin, Gong-Ru

    2013-07-15

    The coherent injection-locking and directly modulation of a long-cavity colorless laser diode with 1% end-facet reflectance and weak-resonant longitudinal modes is employed as an universal optical transmitter to demonstrated for optical 16-QAM OFDM transmission at 12 Gbit/s over 25 km in a DWDM-PON system. The optimized bias current of 30 mA (~1.5Ith) with corresponding extinction ratio (ER) of 6 dB and the external injection power of -9 dBm is (are) required for such a wavelength-locked universal transmitter to carry the 16-QAM and 122-subcarrier formatted OFDM and data-stream. By increasing external injection-locking from -9 dBm to 0 dBm, the peak-to-peak chirp of the OFDM data stream reduces from 7.7 to 5.4 GHz. The side mode suppression ratio (SMSR) of up to 50 dB is achieved with wider detuning range between -0.5 nm to 2.0 nm under an injection power of 0 dBm. By modulating such a colorless laser diode with an OFDM data stream of 122 subcarriers at a central carrier frequency of 1.5625 GHz and a total bandwidth of 3 GHz, the transmission data rate of up to 12 Gbit/s in standard single-mode fiber over 25 km is demonstrated to achieve an error vector magnitude (EVM) of 5.435%. Such a universal colorless DWDM-PON transmitter can deliver the optical OFDM data-stream at 12 Gbit/s QAM-OFDM data after 25-km transmission with a receiving power sensitivity of -7 dBm at BER of 3.6 × 10(-7) when pre-amplifying the OFDM data by 5 dB.

  1. Strategies for P2P connectivity in reconfigurable converged wired/wireless access networks.

    PubMed

    Puerto, Gustavo; Mora, José; Ortega, Beatriz; Capmany, José

    2010-12-06

    This paper presents different strategies to define the architecture of a Radio-Over-Fiber (RoF) Access networks enabling Peer-to-Peer (P2P) functionalities. The architectures fully exploit the flexibility of a wavelength router based on the feedback configuration of an Arrayed Waveguide Grating (AWG) and an optical switch to broadcast P2P services among diverse infrastructures featuring dynamic channel allocation and enabling an optical platform for 3G and beyond wireless backhaul requirements. The first architecture incorporates a tunable laser to generate a dedicated wavelength for P2P purposes and the second architecture takes advantage of reused wavelengths to enable the P2P connectivity among Optical Network Units (ONUs) or Base Stations (BS). While these two approaches allow the P2P connectivity in a one at a time basis (1:1), the third architecture enables the broadcasting of P2P sessions among different ONUs or BSs at the same time (1:M). Experimental assessment of the proposed architecture shows approximately 0.6% Error Vector Magnitude (EVM) degradation for wireless services and 1 dB penalty in average for 1 x 10(-12) Bit Error Rate (BER) for wired baseband services.

  2. A saw-less direct conversion long term evolution receiver with 25% duty-cycle LO in 130 nm CMOS technology

    NASA Astrophysics Data System (ADS)

    Siyuan, He; Changhong, Zhang; Liang, Tao; Weifeng, Zhang; Longyue, Zeng; Wei, Lü; Haijun, Wu

    2013-03-01

    A CMOS long-term evolution (LTE) direct convert receiver that eliminates the interstage SAW filter is presented. The receiver consists of a low noise variable gain transconductance amplifier (TCA), a quadrature passive current commutating mixer with a 25% duty-cycle LO, a trans-impedance amplifier (TIA), a 7th-order Chebyshev filter and programmable gain amplifiers (PGAs). A wide dynamic gain range is allocated in the RF and analog parts. A current commutating passive mixer with a 25% duty-cycle LO improves gain, noise, and linearity. An LPF based on a Tow-Thomas biquad suppresses out-of-band interference. Fabricated in a 0.13 μm CMOS process, the receiver chain achieves a 107 dB maximum voltage gain, 2.7 dB DSB NF (from PAD port), -11 dBm IIP3, and > +65 dBm IIP2 after calibration, 96 dB dynamic control range with 1 dB steps, less than 2% error vector magnitude (EVM) from 2.3 to 2.7 GHz. The total receiver (total I Q path) draws 89 mA from a 1.2-V LDO on chip supply.

  3. Wideband LTE power amplifier with integrated novel analog pre-distorter linearizer for mobile wireless communications.

    PubMed

    Uthirajoo, Eswaran; Ramiah, Harikrishnan; Kanesan, Jeevan; Reza, Ahmed Wasif

    2014-01-01

    For the first time, a new circuit to extend the linear operation bandwidth of a LTE (Long Term Evolution) power amplifier, while delivering a high efficiency is implemented in less than 1 mm2 chip area. The 950 µm × 900 µm monolithic microwave integrated circuit (MMIC) power amplifier (PA) is fabricated in a 2 µm InGaP/GaAs process. An on-chip analog pre-distorter (APD) is designed to improve the linearity of the PA, up to 20 MHz channel bandwidth. Intended for 1.95 GHz Band 1 LTE application, the PA satisfies adjacent channel leakage ratio (ACLR) and error vector magnitude (EVM) specifications for a wide LTE channel bandwidth of 20 MHz at a linear output power of 28 dBm with corresponding power added efficiency (PAE) of 52.3%. With a respective input and output return loss of 30 dB and 14 dB, the PA's power gain is measured to be 32.5 dB while exhibiting an unconditional stability characteristic from DC up to 5 GHz. The proposed APD technique serves to be a good solution to improve linearity of a PA without sacrificing other critical performance metrics.

  4. Wideband LTE Power Amplifier with Integrated Novel Analog Pre-Distorter Linearizer for Mobile Wireless Communications

    PubMed Central

    Uthirajoo, Eswaran; Ramiah, Harikrishnan; Kanesan, Jeevan; Reza, Ahmed Wasif

    2014-01-01

    For the first time, a new circuit to extend the linear operation bandwidth of a LTE (Long Term Evolution) power amplifier, while delivering a high efficiency is implemented in less than 1 mm2 chip area. The 950 µm × 900 µm monolithic microwave integrated circuit (MMIC) power amplifier (PA) is fabricated in a 2 µm InGaP/GaAs process. An on-chip analog pre-distorter (APD) is designed to improve the linearity of the PA, up to 20 MHz channel bandwidth. Intended for 1.95 GHz Band 1 LTE application, the PA satisfies adjacent channel leakage ratio (ACLR) and error vector magnitude (EVM) specifications for a wide LTE channel bandwidth of 20 MHz at a linear output power of 28 dBm with corresponding power added efficiency (PAE) of 52.3%. With a respective input and output return loss of 30 dB and 14 dB, the PA’s power gain is measured to be 32.5 dB while exhibiting an unconditional stability characteristic from DC up to 5 GHz. The proposed APD technique serves to be a good solution to improve linearity of a PA without sacrificing other critical performance metrics. PMID:25033049

  5. Going beyond 4 Gbps data rate by employing RGB laser diodes for visible light communication.

    PubMed

    Janjua, Bilal; Oubei, Hassan M; Durán Retamal, Jose R; Ng, Tien Khee; Tsai, Cheng-Ting; Wang, Huai-Yung; Chi, Yu-Chieh; Kuo, Hao-Chung; Lin, Gong-Ru; He, Jr-Hau; Ooi, Boon S

    2015-07-13

    With increasing interest in visible light communication, the laser diode (LD) provides an attractive alternative, with higher efficiency, shorter linewidth and larger bandwidth for high-speed visible light communication (VLC). Previously, more than 3 Gbps data rate was demonstrated using LED. By using LDs and spectral-efficient orthogonal frequency division multiplexing encoding scheme, significantly higher data rates has been achieved in this work. Using 16-QAM modulation scheme, in conjunction with red, blue and green LDs, data rates of 4.4 Gbps, 4 Gbps and 4 Gbps, with the corresponding BER/SNR/EVM of 3.3 × 10⁻³/15.3/17.9, 1.4 × 10⁻³/16.3/15.4 and 2.8 × 10⁻³/15.5/16.7were obtained over transmission distance of ~20 cm. We also simultaneously demonstrated white light emission using red, blue and green LDs, after passing through a commercially available diffuser element. Our work highlighted that a tradeoff exists in operating the blue LDs at optimum bias condition while maintaining good color temperature. The best results were obtained when encoding red LDs which gave both the strongest received signal amplitude and white light with CCT value of 5835K.

  6. A 400 MHz Wireless Neural Signal Processing IC With 625 $\\times$ On-Chip Data Reduction and Reconfigurable BFSK/QPSK Transmitter Based on Sequential Injection Locking.

    PubMed

    Teng, Kok-Hin; Wu, Tong; Liu, Xiayun; Yang, Zhi; Heng, Chun-Huat

    2017-06-01

    An 8-channel wireless neural signal processing IC, which can perform real-time spike detection, alignment, and feature extraction, and wireless data transmission is proposed. A reconfigurable BFSK/QPSK transmitter (TX) at MICS/MedRadio band is incorporated to support different data rate requirement. By using an Exponential Component-Polynomial Component (EC-PC) spike processing unit with an incremental principal component analysis (IPCA) engine, the detection of neural spikes with poor SNR is possible while achieving 625× data reduction. For the TX, a dual-channel at 401 MHz and 403.8 MHz are supported by applying sequential injection locked techniques while attaining phase noise of -102 dBc/Hz at 100 kHz offset. From the measurement, error vector magnitude (EVM) of 4.60%/9.55% with power amplifier (PA) output power of -15 dBm is achieved for the QPSK at 8 Mbps and the BFSK at 12.5 kbps. Fabricated in 65 nm CMOS with an active area of 1 mm 2 , the design consumes a total current of 5  ∼ 5.6 mA with a maximum energy efficiency of 0.7 nJ/b.

  7. Game theory based models to analyze water conflicts in the Middle Route of the South-to-North Water Transfer Project in China.

    PubMed

    Wei, Shouke; Yang, Hong; Abbaspour, Karim; Mousavi, Jamshid; Gnauck, Albrecht

    2010-04-01

    This study applied game theory based models to analyze and solve water conflicts concerning water allocation and nitrogen reduction in the Middle Route of the South-to-North Water Transfer Project in China. The game simulation comprised two levels, including one main game with five players and four sub-games with each containing three sub-players. We used statistical and econometric regression methods to formulate payoff functions of the players, economic valuation methods (EVMs) to transform non-monetary value into economic one, cost-benefit Analysis (CBA) to compare the game outcomes, and scenario analysis to investigate the future uncertainties. The validity of game simulation was evaluated by comparing predictions with observations. The main results proved that cooperation would make the players collectively better off, though some player would face losses. However, players were not willing to cooperate, which would result in a prisoners' dilemma. Scenarios simulation results displayed that players in water scare area could not solve its severe water deficit problem without cooperation with other players even under an optimistic scenario, while the uncertainty of cooperation would come from the main polluters. The results suggest a need to design a mechanism to reduce the risk of losses of those players by a side payment, which provides them with economic incentives to cooperate. Copyright (c) 2010 Elsevier Ltd. All rights reserved.

  8. Examining in vivo tympanic membrane mobility using smart phone video-otoscopy and phase-based Eulerian video magnification

    NASA Astrophysics Data System (ADS)

    Janatka, Mirek; Ramdoo, Krishan S.; Tatla, Taran; Pachtrachai, Krittin; Elson, Daniel S.; Stoyanov, Danail

    2017-03-01

    The tympanic membrane (TM) is the bridging element between the pressure waves of sound in air and the ossicular chain. It allows for sound to be conducted into the inner ear, achieving the human sense of hearing. Otitis media with effusion (OME, commonly referred to as `glue ear') is a typical condition in infants that prevents the vibration of the TM and causes conductive hearing loss, this can lead to stunting early stage development if undiagnosed. Furthermore, OME is hard to identify in this age group; as they cannot respond to typical audiometry tests. Tympanometry allows for the mobility of the TM to be examined without patient response, but requires expensive apparatus and specialist training. By combining a smartphone equipped with a 240 frames per second video recording capability with an otoscopic clip-on accessory, this paper presents a novel application of Eulerian Video Magnification (EVM) to video-otology, that could provide assistance in diagnosing OME. We present preliminary results showing a spatio-temporal slice taken from an exaggerated video visualization of the TM being excited in vivo on a healthy ear. Our preliminary results demonstrate the potential for using such an approach for diagnosing OME under visual inspection as alternative to tympanometry, which could be used remotely and hence help diagnosis in a wider population pool.

  9. Determining the Time of Flight and Speed of Sound on Different types of Edible Oil

    NASA Astrophysics Data System (ADS)

    Azman, N. A.; Hamid, S. B. Abd

    2017-11-01

    Edible oil is most often plant-based oils that have been extracted from various seeds. There are cases where the fully virgin edible oil was found to be a fraud. The adulterated edible oil indicates the intentional, fraudulent addition of extraneous, improper or cheaper ingredients puts into the oil or the dilution or removal of some valuable ingredient of the oil in order to increase profits. Hence, decrease the reliability of the Malaysian food product quality. This research was done by using the method of time of flight obtained using the Texas Instrument board, TDC1000-TDC7200 EVM connected to an ultrasonic transducer with 1 MHz frequency. The authors measured the time of flight and temperatures controlled from 20°C to 40°C of five vegetable oils (olive oil, sunflower oil, corn oil, coconut oil, and mustard oil). The value is observed and compared with other research from the literature review. From the study, time of flight values decreases exponentially while speed of sound value increases. This relationship will be useful in spectrum unfolding method to investigate the adulteration in different type of edible oil.This research outcome is to investigate the quality value of the different type of edible oil while eliminates the issues where the quality of Malaysian food product is not reliable.

  10. A Low Cost Bluetooth Low Energy Transceiver for Wireless Sensor Network Applications with a Front-end Receiver-Matching Network-Reusing Power Amplifier Load Inductor.

    PubMed

    Liang, Zhen; Li, Bin; Huang, Mo; Zheng, Yanqi; Ye, Hui; Xu, Ken; Deng, Fangming

    2017-04-19

    In this work, a low cost Bluetooth Low Energy (BLE) transceiver for wireless sensor network (WSN) applications, with a receiver (RX)-matching network-reusing power amplifier (PA) load inductor, is presented. In order to decrease the die area, only two inductors were used in this work. Besides the one used in the voltage control oscillator (VCO), the PA load inductor was reused as the RX impedance matching component in the front-end. Proper controls have been applied to achieve high transmitter (TX) input impedance when the transceiver is in the receiving mode, and vice versa. This allows the TRX-switch/matching network integration without significant performance degradation. The RX adopted a low-IF structure and integrated a single-ended low noise amplifier (LNA), a current bleeding mixer, a 4th complex filter and a delta-sigma continuous time (CT) analog-to-digital converter (ADC). The TX employed a two-point PLL-based architecture with a non-linear PA. The RX achieved a sensitivity of -93 dBm and consumes 9.7 mW, while the TX achieved a 2.97% error vector magnitude (EVM) with 9.4 mW at 0 dBm output power. This design was fabricated in a 0.11 μm complementary metal oxide semiconductor (CMOS) technology and the front-end circuit only occupies 0.24 mm². The measurement results verify the effectiveness and applicability of the proposed BLE transceiver for WSN applications.

  11. 5 CFR 430.304 - SES performance management systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false SES performance management systems. 430... PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.304 SES performance management systems. (a... or more performance management systems for its senior executives. (b) Performance management systems...

  12. 5 CFR 430.304 - SES performance management systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false SES performance management systems. 430... PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.304 SES performance management systems. (a... or more performance management systems for its senior executives. (b) Performance management systems...

  13. 5 CFR 430.304 - SES performance management systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false SES performance management systems. 430... PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.304 SES performance management systems. (a... or more performance management systems for its senior executives. (b) Performance management systems...

  14. 5 CFR 430.304 - SES performance management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false SES performance management systems. 430... PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.304 SES performance management systems. (a... or more performance management systems for its senior executives. (b) Performance management systems...

  15. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...

  16. Learning an Eddy Viscosity Model Using Shrinkage and Bayesian Calibration: A Jet-in-Crossflow Case Study

    DOE PAGES

    Ray, Jaideep; Lefantzi, Sophia; Arunajatesan, Srinivasan; ...

    2017-09-07

    In this paper, we demonstrate a statistical procedure for learning a high-order eddy viscosity model (EVM) from experimental data and using it to improve the predictive skill of a Reynolds-averaged Navier–Stokes (RANS) simulator. The method is tested in a three-dimensional (3D), transonic jet-in-crossflow (JIC) configuration. The process starts with a cubic eddy viscosity model (CEVM) developed for incompressible flows. It is fitted to limited experimental JIC data using shrinkage regression. The shrinkage process removes all the terms from the model, except an intercept, a linear term, and a quadratic one involving the square of the vorticity. The shrunk eddy viscositymore » model is implemented in an RANS simulator and calibrated, using vorticity measurements, to infer three parameters. The calibration is Bayesian and is solved using a Markov chain Monte Carlo (MCMC) method. A 3D probability density distribution for the inferred parameters is constructed, thus quantifying the uncertainty in the estimate. The phenomenal cost of using a 3D flow simulator inside an MCMC loop is mitigated by using surrogate models (“curve-fits”). A support vector machine classifier (SVMC) is used to impose our prior belief regarding parameter values, specifically to exclude nonphysical parameter combinations. The calibrated model is compared, in terms of its predictive skill, to simulations using uncalibrated linear and CEVMs. Finally, we find that the calibrated model, with one quadratic term, is more accurate than the uncalibrated simulator. The model is also checked at a flow condition at which the model was not calibrated.« less

  17. Learning an Eddy Viscosity Model Using Shrinkage and Bayesian Calibration: A Jet-in-Crossflow Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ray, Jaideep; Lefantzi, Sophia; Arunajatesan, Srinivasan

    In this paper, we demonstrate a statistical procedure for learning a high-order eddy viscosity model (EVM) from experimental data and using it to improve the predictive skill of a Reynolds-averaged Navier–Stokes (RANS) simulator. The method is tested in a three-dimensional (3D), transonic jet-in-crossflow (JIC) configuration. The process starts with a cubic eddy viscosity model (CEVM) developed for incompressible flows. It is fitted to limited experimental JIC data using shrinkage regression. The shrinkage process removes all the terms from the model, except an intercept, a linear term, and a quadratic one involving the square of the vorticity. The shrunk eddy viscositymore » model is implemented in an RANS simulator and calibrated, using vorticity measurements, to infer three parameters. The calibration is Bayesian and is solved using a Markov chain Monte Carlo (MCMC) method. A 3D probability density distribution for the inferred parameters is constructed, thus quantifying the uncertainty in the estimate. The phenomenal cost of using a 3D flow simulator inside an MCMC loop is mitigated by using surrogate models (“curve-fits”). A support vector machine classifier (SVMC) is used to impose our prior belief regarding parameter values, specifically to exclude nonphysical parameter combinations. The calibrated model is compared, in terms of its predictive skill, to simulations using uncalibrated linear and CEVMs. Finally, we find that the calibrated model, with one quadratic term, is more accurate than the uncalibrated simulator. The model is also checked at a flow condition at which the model was not calibrated.« less

  18. United States Army Medical Materiel Development Activity: 1997 Annual Report.

    DTIC Science & Technology

    1997-01-01

    business planning and execution information management system (Project Management Division Database ( PMDD ) and Product Management Database System (PMDS...MANAGEMENT • Project Management Division Database ( PMDD ), Product Management Database System (PMDS), and Special Users Database System:The existing...System (FMS), were investigated. New Product Managers and Project Managers were added into PMDS and PMDD . A separate division, Support, was

  19. Development of Participative Management System in Learning Environment Management for Small Sized Primary Schools

    ERIC Educational Resources Information Center

    Hernthaisong, Prasertsak; Sirisuthi, Chaiyuth; Wisetrinthong, Kanjana

    2017-01-01

    The research aimed to: 1) study the factors of a participative management system in learning environment management, 2) study the current situation, desirable outcomes, and further needs for developing a participative management system in learning management, 3) develop a working participative management system, and 4) assess the system's…

  20. Resource Management for Distributed Parallel Systems

    NASA Technical Reports Server (NTRS)

    Neuman, B. Clifford; Rao, Santosh

    1993-01-01

    Multiprocessor systems should exist in the the larger context of distributed systems, allowing multiprocessor resources to be shared by those that need them. Unfortunately, typical multiprocessor resource management techniques do not scale to large networks. The Prospero Resource Manager (PRM) is a scalable resource allocation system that supports the allocation of processing resources in large networks and multiprocessor systems. To manage resources in such distributed parallel systems, PRM employs three types of managers: system managers, job managers, and node managers. There exist multiple independent instances of each type of manager, reducing bottlenecks. The complexity of each manager is further reduced because each is designed to utilize information at an appropriate level of abstraction.

  1. 48 CFR 245.105 - Contractors' property management system compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractors' property management system compliance. (a) Definitions— (1) Acceptable property management system...

  2. A system management methodology for building successful resource management systems

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller; Willoughby, John K.

    1989-01-01

    This paper presents a system management methodology for building successful resource management systems that possess lifecycle effectiveness. This methodology is based on an analysis of the traditional practice of Systems Engineering Management as it applies to the development of resource management systems. The analysis produced fifteen significant findings presented as recommended adaptations to the traditional practice of Systems Engineering Management to accommodate system development when the requirements are incomplete, unquantifiable, ambiguous and dynamic. Ten recommended adaptations to achieve operational effectiveness when requirements are incomplete, unquantifiable or ambiguous are presented and discussed. Five recommended adaptations to achieve system extensibility when requirements are dynamic are also presented and discussed. The authors conclude that the recommended adaptations to the traditional practice of Systems Engineering Management should be implemented for future resource management systems and that the technology exists to build these systems extensibly.

  3. 41 CFR 101-39.104 - Notice of establishment of a fleet management system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management system in order to work out any problems pertaining to establishing and operating fleet management... of a fleet management system. 101-39.104 Section 101-39.104 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS AVIATION...

  4. 41 CFR 101-39.104 - Notice of establishment of a fleet management system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management system in order to work out any problems pertaining to establishing and operating fleet management... of a fleet management system. 101-39.104 Section 101-39.104 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS AVIATION...

  5. 41 CFR 101-39.104 - Notice of establishment of a fleet management system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management system in order to work out any problems pertaining to establishing and operating fleet management... of a fleet management system. 101-39.104 Section 101-39.104 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS AVIATION...

  6. 41 CFR 101-39.104 - Notice of establishment of a fleet management system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management system in order to work out any problems pertaining to establishing and operating fleet management... of a fleet management system. 101-39.104 Section 101-39.104 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS AVIATION...

  7. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...

  8. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...

  9. 14 CFR 1212.704 - System manager.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false System manager. 1212.704 Section 1212.704... Authority and Responsibilities § 1212.704 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  10. 77 FR 43100 - Privacy Act of 1974; Department of Homeland Security, Federal Emergency Management Agency-009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... Information System (NEMIS)--Mitigation (MT) Electronic Grants Management System of Records,'' and retitle it... Information System (NEMIS)--Mitigation (MT) Electronic Grants Management System of Records (69 FR 75079... Management Information System (NEMIS)--Mitigation (MT) Electronic Grants Management System (NEMIS--MT eGrants...

  11. 14 CFR 1212.705 - System manager.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false System manager. 1212.705 Section 1212.705... Authority and Responsibilities § 1212.705 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  12. 14 CFR 1212.704 - System manager.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true System manager. 1212.704 Section 1212.704... Authority and Responsibilities § 1212.704 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  13. 14 CFR 1212.704 - System manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false System manager. 1212.704 Section 1212.704... Authority and Responsibilities § 1212.704 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance: (1) Overall...

  14. Information Security Management - Part Of The Integrated Management System

    NASA Astrophysics Data System (ADS)

    Manea, Constantin Adrian

    2015-07-01

    The international management standards allow their integrated approach, thereby combining aspects of particular importance to the activity of any organization, from the quality management systems or the environmental management of the information security systems or the business continuity management systems. Although there is no national or international regulation, nor a defined standard for the Integrated Management System, the need to implement an integrated system occurs within the organization, which feels the opportunity to integrate the management components into a cohesive system, in agreement with the purpose and mission publicly stated. The issues relating to information security in the organization, from the perspective of the management system, raise serious questions to any organization in the current context of electronic information, reason for which we consider not only appropriate but necessary to promote and implement an Integrated Management System Quality - Environment - Health and Operational Security - Information Security

  15. 41 CFR 109-1.5205 - Personal property management system changes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management system changes. 109-1.5205 Section 109-1.5205 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS... Personal property management system changes. Any proposed significant change to a designated contractor's...

  16. Advanced Distribution Management Systems | Grid Modernization | NREL

    Science.gov Websites

    Advanced Distribution Management Systems Advanced Distribution Management Systems Electric utilities are investing in updated grid technologies such as advanced distribution management systems to management testbed for cyber security in power systems. The "advanced" elements of advanced

  17. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management systems. 632.76 Section... management systems. (a) All Native American grantees shall establish management information systems to... for the overall management of all programs including: (1) Eligibility verification systems as...

  18. A systems engineering management approach to resource management applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  19. 41 CFR 101-39.104-1 - Consolidations into a fleet management system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... fleet management system. 101-39.104-1 Section 101-39.104-1 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and...

  20. 44 CFR 13.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management systems. 13.20 Section 13.20 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT... Standards for financial management systems. (a) A State must expand and account for grant funds in... financial management systems of other grantees and subgrantees must meet the following standards: (1...

  1. 14 CFR § 1212.705 - System manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false System manager. § 1212.705 Section § 1212... NASA Authority and Responsibilities § 1212.705 System manager. (a) Each system manager is responsible for the following with regard to the system of records over which the system manager has cognizance...

  2. 48 CFR 2452.242-71 - Contract management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  3. Automating the Air Force Retail-Level Equipment Management Process: An Application of Microcomputer-Based Information Systems Techniques

    DTIC Science & Technology

    1988-09-01

    could use the assistance of a microcomputer-based management information system . However, adequate system design and development requires an in-depth...understanding of the Equipment Management Section and the environment in which it functions were asked and answered. Then, a management information system was...designed, developed, and tested. The management information system is called the Equipment Management Information System (EMIS).

  4. Warrant Officer Orientation Course (WOOC) Evaluation

    DTIC Science & Technology

    1981-10-01

    Army Mainte- nance Management System, Security Awareness, Organizational Effectiveness, Introduction to Management , Enlisted Personnel Management...Orientation Introduction to Management Professional Ethics USA Officer Evaluation Reporting System (OES) Military Correspondence Military...Organizational Effectiveness, Introduction to Management , Enlisted Personnal Management System, and The Army Functional Files System and The Army

  5. 23 CFR 970.214 - Federal lands congestion management system (CMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Federal lands congestion management system (CMS). 970... LANDS HIGHWAYS NATIONAL PARK SERVICE MANAGEMENT SYSTEMS National Park Service Management Systems § 970.214 Federal lands congestion management system (CMS). (a) For purposes of this section, congestion...

  6. 5 CFR 297.103 - Designations of authority by system manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Designations of authority by system manager. 297.103 Section 297.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE... system manager. The responsible Office system manager having jurisdiction over a system of records may...

  7. 25 CFR 276.7 - Standards for grantee financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standards for grantee financial management systems. 276.7... grantee financial management systems. (a) Grantee financial management systems for grants and subgrantee financial management systems for subgrants shall provide for: (1) Accurate, current, and complete disclosure...

  8. 41 CFR 101-39.104-1 - Consolidations into a fleet management system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... fleet management system. 101-39.104-1 Section 101-39.104-1 Public Contracts and Property Management..., TRANSPORTATION, AND MOTOR VEHICLES 39-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet Management Systems § 101-39.104-1 Consolidations into a fleet management...

  9. Distribution Management System Volt/VAR Evaluation | Grid Modernization |

    Science.gov Websites

    NREL Distribution Management System Volt/VAR Evaluation Distribution Management System Volt/VAR Evaluation This project involves building a prototype distribution management system testbed that links a GE Grid Solutions distribution management system to power hardware-in-the-loop testing. This setup is

  10. 33 CFR 96.220 - What makes up a safety management system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.220 What makes up a safety management system? (a) The safety management system must document the responsible person's— (1) Safety and pollution prevention...

  11. 23 CFR 973.210 - Indian lands bridge management system (BMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands bridge management system (BMS). 973.210... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs Management Systems § 973.210 Indian lands bridge management system (BMS...

  12. 23 CFR 973.214 - Indian lands congestion management system (CMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands congestion management system (CMS). 973.214... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs Management Systems § 973.214 Indian lands congestion management system...

  13. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ....204-13 System for Award Management Maintenance. * * * * * System for Award Management Maintenance (Jul...; System for Award Management Name Change, Phase 1 Implementation AGENCY: Department of Defense (DoD... System for Award Management (SAM) database. DATES: Effective Date: July 22, 2013. FOR FURTHER INFORMATION...

  14. Information Requirements for a Procurement Management Information System.

    DTIC Science & Technology

    1975-08-01

    Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be

  15. Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia

    NASA Astrophysics Data System (ADS)

    Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena

    2015-06-01

    In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.

  16. Strategic management of health care information systems: nurse managers' perceptions.

    PubMed

    Lammintakanen, Johanna; Kivinen, Tuula; Saranto, Kaija; Kinnunen, Juha

    2009-01-01

    The aim of this study is to describe nurse managers' perceptions of the strategic management of information systems in health care. Lack of strategic thinking is a typical feature in health care and this may also concern information systems. The data for this study was collected by eight focus group interviews including altogether 48 nurse managers from primary and specialised health care. Five main categories described the strategic management of information systems in health care; IT as an emphasis of strategy; lack of strategic management of information systems; the importance of management; problems in privacy protection; and costs of IT. Although IT was emphasised in the strategies of many health care organisations, a typical feature was a lack of strategic management of information systems. This was seen both as an underutilisation of IT opportunities in health care organisations and as increased workload from nurse managers' perspective. Furthermore, the nurse managers reported that implementation of IT strengthened their managerial roles but also required stronger management. In conclusion, strategic management of information systems needs to be strengthened in health care and nurse managers should be more involved in this process.

  17. 32 CFR 239.10 - Management Controls.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management in formation system to protect the privacy information of Expanded...

  18. 32 CFR 239.10 - Management controls.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management information system to protect the privacy of Expanded HAP...

  19. 32 CFR 239.10 - Management controls.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management information system to protect the privacy of Expanded HAP...

  20. 32 CFR 239.10 - Management controls.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management information system to protect the privacy of Expanded HAP...

  1. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  2. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  3. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  4. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  5. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  6. [Relationship Between Members Satisfaction with Service Club Management Processes and Perception of Club Management System.

    ERIC Educational Resources Information Center

    Dawson, Frances Trigg

    A study was made to determine the relationships between (1) satisfaction of members with service club management processes and member's perception of management systems, (2) perception of service club management system to selected independent variables, and (3) satisfaction to perception of service club management systems with independent…

  7. 41 CFR 302-1.100 - What is a comprehensive, automated relocation management system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... system? A comprehensive, automated relocation management system is a system that integrates into a single... 41 Public Contracts and Property Management 4 2014-07-01 2014-07-01 false What is a comprehensive, automated relocation management system? 302-1.100 Section 302-1.100 Public Contracts and Property Management...

  8. 41 CFR 302-1.100 - What is a comprehensive, automated relocation management system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system? A comprehensive, automated relocation management system is a system that integrates into a single... 41 Public Contracts and Property Management 4 2013-07-01 2012-07-01 true What is a comprehensive, automated relocation management system? 302-1.100 Section 302-1.100 Public Contracts and Property Management...

  9. 41 CFR 302-1.100 - What is a comprehensive, automated relocation management system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system? A comprehensive, automated relocation management system is a system that integrates into a single... 41 Public Contracts and Property Management 4 2011-07-01 2011-07-01 false What is a comprehensive, automated relocation management system? 302-1.100 Section 302-1.100 Public Contracts and Property Management...

  10. 41 CFR 302-1.100 - What is a comprehensive, automated relocation management system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... system? A comprehensive, automated relocation management system is a system that integrates into a single... 41 Public Contracts and Property Management 4 2012-07-01 2012-07-01 false What is a comprehensive, automated relocation management system? 302-1.100 Section 302-1.100 Public Contracts and Property Management...

  11. Environmental Files and Data Bases. Part A. Introduction and Oceanographic Management Information System.

    DTIC Science & Technology

    1981-09-01

    Management Information System Naval Oceanography Program Naval Oceanographic Requirements Acoustic Reference Service Research Vehicle...THE OCEANOGRAPHIC MANAGEMENT INFORMATION SYSTEM . .. .... 2-1 3. ACOUSTIC DATA .. .. .... ......... ...... 3-1 4. GEOLOGICAL AND GEOPHYSICAL DATA...36 CHAPTER 2 THE OCEANOGRAPHIC MANAGEMENT INFORMATION SYSTEM 2-i CHAPTER 2 THE OCEANOGRAPHIC MANAGEMENT INFORMATION SYSTEM CONTENTS Page

  12. 76 FR 76917 - Homeless Management Information Systems Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    ...-P-01] Homeless Management Information Systems Requirements AGENCY: Office of the Assistant Secretary... for the establishment of regulations for Homeless Management Information Systems (HMIS), which are the... community development, Homeless, Information technology system, Management system, Nonprofit organizations...

  13. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section...

  14. A Data-Based Financial Management Information System (FMIS) for Administrative Sciences Department

    DTIC Science & Technology

    1990-12-01

    Financial Management Information System that would result in improved management of financial assets, better use of clerical skills, and more detailed...develops and implements a personal computer-based Management Information System for the Management of the many funding accounts controlled by the...different software programs, into a single all-encompassing Management Information System . The system was written using dBASE IV and is currently operational.

  15. The influence of enterprise resource planning (ERP) systems' performance on earnings management

    NASA Astrophysics Data System (ADS)

    Tsai, Wen-Hsien; Lee, Kuen-Chang; Liu, Jau-Yang; Lin, Sin-Jin; Chou, Yu-Wei

    2012-11-01

    We analyse whether there is a linkage between performance measures of enterprise resource planning (ERP) systems and earnings management. We find that earnings management decreases with the higher performance of ERP systems. The empirical result is as expected. We further analyse how the dimension of the DeLone and McLean model of information systems success affects earnings management. We find that the relationship between the performance of ERP systems and earnings management depends on System Quality after ERP implementation. The more System Quality improves, the more earnings management is reduced.

  16. 48 CFR 245.105 - Contractor's property management system compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management system compliance. 245.105 Section 245.105 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 245.105 Contractor's property management system compliance. The assigned property administrator shall perform...

  17. Integrated Computer System of Management in Logistics

    NASA Astrophysics Data System (ADS)

    Chwesiuk, Krzysztof

    2011-06-01

    This paper aims at presenting a concept of an integrated computer system of management in logistics, particularly in supply and distribution chains. Consequently, the paper includes the basic idea of the concept of computer-based management in logistics and components of the system, such as CAM and CIM systems in production processes, and management systems for storage, materials flow, and for managing transport, forwarding and logistics companies. The platform which integrates computer-aided management systems is that of electronic data interchange.

  18. The Art World's Concept of Negative Space Applied to System Safety Management

    NASA Technical Reports Server (NTRS)

    Goodin, James Ronald (Ronnie)

    2005-01-01

    Tools from several different disciplines can improve system safety management. This paper relates the Art World with our system safety world, showing useful art schools of thought applied to system safety management, developing an art theory-system safety bridge. This bridge is then used to demonstrate relations with risk management, the legal system, personnel management and basic management (establishing priorities). One goal of this presentation/paper is simply to be a fun diversion from the many technical topics presented during the conference.

  19. Analysis of Service Records Management Systems for Rescue and Retention of Cultural Resource Documents

    DTIC Science & Technology

    2009-06-01

    this information was not migrated to the new data- base . The responsible offices were told to destroy the old cards, and thus, vast amounts of...then necessary to examine the online service-specific records management systems , namely Army Records Information Management System (ARIMS ), Air...Force Records Information Management System (AFRIMS), and the Navy Records Management System .3 Each system

  20. 41 CFR 102-34.340 - Do we need a fleet management information system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management information system? 102-34.340 Section 102-34.340 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Federal Fleet Report § 102-34.340 Do we need a fleet management information system? Yes, you must have a fleet management information system at the department or agency level that — (a...

  1. 41 CFR 102-34.340 - Do we need a fleet management information system?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management information system? 102-34.340 Section 102-34.340 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Federal Fleet Report § 102-34.340 Do we need a fleet management information system? Yes, you must have a fleet management information system at the department or agency level that — (a...

  2. 41 CFR 102-34.340 - Do we need a fleet management information system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management information system? 102-34.340 Section 102-34.340 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Federal Fleet Report § 102-34.340 Do we need a fleet management information system? Yes, you must have a fleet management information system at the department or agency level that — (a...

  3. 41 CFR 102-34.340 - Do we need a fleet management information system?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... management information system? 102-34.340 Section 102-34.340 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Federal Fleet Report § 102-34.340 Do we need a fleet management information system? Yes, you must have a fleet management information system at the department or agency level that — (a...

  4. 41 CFR 102-34.340 - Do we need a fleet management information system?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... management information system? 102-34.340 Section 102-34.340 Public Contracts and Property Management Federal... VEHICLE MANAGEMENT Federal Fleet Report § 102-34.340 Do we need a fleet management information system? Yes, you must have a fleet management information system at the department or agency level that — (a...

  5. 48 CFR 970.5232-7 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970.3270(b)(1), insert the following clause: Financial Management System (DEC 2000) The Contractor shall...

  6. 48 CFR 970.5232-7 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintain and administer a financial management system that is suitable to provide proper accounting in... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Financial management... for Management and Operating Contracts 970.5232-7 Financial management system. As prescribed in 970...

  7. Development of the KOSMS management simulation training system and its application

    NASA Astrophysics Data System (ADS)

    Takatsu, Yoshiki

    The use of games which simulate actual corporate management has recently become more common and is now utilized in various ways for in-house corporate training courses. KOSMS (Kobe Steel Management Simulation System), a training system designed to help improve the management skills of senior management staff, is a unique management simulation training system in which the participants, using personal computers, must make decisions concerning a variety of management activities, in simulated competition with other corporations. This report outlines the KOSMS system, and describes the basic structure and detailed contents of the management simulation models, and actual application of the KOSMS management simulation training.

  8. Evaluation of Microcomputer-Based Operation and Maintenance Management Systems for Army Water/Wastewater Treatment Plant Operation.

    DTIC Science & Technology

    1986-07-01

    COMPUTER-AIDED OPERATION MANAGEMENT SYSTEM ................. 29 Functions of an Off-Line Computer-Aided Operation Management System Applications of...System Comparisons 85 DISTRIBUTION 5V J. • 0. FIGURES Number Page 1 Hardware Components 21 2 Basic Functions of a Computer-Aided Operation Management System...Plant Visits 26 4 Computer-Aided Operation Management Systems Reviewed for Analysis of Basic Functions 29 5 Progress of Software System Installation and

  9. 5 CFR 9701.405 - Performance management system requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... performance management systems for DHS employees, subject to the requirements set forth in this subpart. (b) Each DHS performance management system must— (1) Specify the employees covered by the system(s); (2... 5 Administrative Personnel 3 2013-01-01 2013-01-01 false Performance management system...

  10. 5 CFR 9701.405 - Performance management system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... performance management systems for DHS employees, subject to the requirements set forth in this subpart. (b) Each DHS performance management system must— (1) Specify the employees covered by the system(s); (2... 5 Administrative Personnel 3 2011-01-01 2011-01-01 false Performance management system...

  11. 5 CFR 9701.405 - Performance management system requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... performance management systems for DHS employees, subject to the requirements set forth in this subpart. (b) Each DHS performance management system must— (1) Specify the employees covered by the system(s); (2... 5 Administrative Personnel 3 2012-01-01 2012-01-01 false Performance management system...

  12. 5 CFR 9701.405 - Performance management system requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... performance management systems for DHS employees, subject to the requirements set forth in this subpart. (b) Each DHS performance management system must— (1) Specify the employees covered by the system(s); (2... 5 Administrative Personnel 3 2014-01-01 2014-01-01 false Performance management system...

  13. Home and Building Energy Management Systems | Grid Modernization | NREL

    Science.gov Websites

    Home and Building Energy Management Systems Home and Building Energy Management Systems NREL building assets and energy management systems can provide value to the grid. Photo of a pair of NREL researchers who received a record of invention for a home energy management system in a smart home laboratory

  14. Feasibility of Executing MIMS on Interdata 80.

    DTIC Science & Technology

    CDC 6500 computers, CDC 6600 computers, MIMS(Medical Information Management System ), Medical information management system , File structures, Computer...storage managementThe report examines the feasibility of implementing large information management system on mini-computers. The Medical Information ... Management System and the Interdata 80 mini-computer were selected as being representative systems. The FORTRAN programs currently being used in MIMS

  15. Design distributed simulation platform for vehicle management system

    NASA Astrophysics Data System (ADS)

    Wen, Zhaodong; Wang, Zhanlin; Qiu, Lihua

    2006-11-01

    Next generation military aircraft requires the airborne management system high performance. General modules, data integration, high speed data bus and so on are needed to share and manage information of the subsystems efficiently. The subsystems include flight control system, propulsion system, hydraulic power system, environmental control system, fuel management system, electrical power system and so on. The unattached or mixed architecture is changed to integrated architecture. That means the whole airborne system is regarded into one system to manage. So the physical devices are distributed but the system information is integrated and shared. The process function of each subsystem are integrated (including general process modules, dynamic reconfiguration), furthermore, the sensors and the signal processing functions are shared. On the other hand, it is a foundation for power shared. Establish a distributed vehicle management system using 1553B bus and distributed processors which can provide a validation platform for the research of airborne system integrated management. This paper establishes the Vehicle Management System (VMS) simulation platform. Discuss the software and hardware configuration and analyze the communication and fault-tolerant method.

  16. Design of investment management optimization system for power grid companies under new electricity reform

    NASA Astrophysics Data System (ADS)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  17. 75 FR 41798 - Solicitation of Letters of Interest to Participate in Biotechnology Quality Management System...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ...] Solicitation of Letters of Interest to Participate in Biotechnology Quality Management System Program AGENCY... participate in the APHIS Biotechnology Quality Management System Program. The Biotechnology Quality Management..., audit-based compliance assistance program known as the Biotechnology Quality Management System Program...

  18. 75 FR 61413 - Notice of Availability of Biotechnology Quality Management System Audit Standard and Evaluation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ...] Notice of Availability of Biotechnology Quality Management System Audit Standard and Evaluation of... Biotechnology Quality Management System Program (BQMS Program) to assist regulated entities in achieving and... customized biotechnology quality management system (BQMS) to improve their management of domestic research...

  19. 25 CFR 900.54 - Should the property management system prescribe internal controls?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Property Management... contract consistent with the Indian tribe or tribal organization's property management system. ... 25 Indians 2 2010-04-01 2010-04-01 false Should the property management system prescribe internal...

  20. 25 CFR 900.54 - Should the property management system prescribe internal controls?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Property Management... contract consistent with the Indian tribe or tribal organization's property management system. ... 25 Indians 2 2011-04-01 2011-04-01 false Should the property management system prescribe internal...

  1. 41 CFR 105-71.120 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management systems. 105-71.120 Section 105-71.120 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services... management systems. (a) A State must expand and account for grant funds in accordance with State laws and...

  2. 41 CFR 105-71.120 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... management systems. 105-71.120 Section 105-71.120 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services... management systems. (a) A State must expand and account for grant funds in accordance with State laws and...

  3. 22 CFR 145.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Standards for financial management systems. 145... Financial and Program Management § 145.21 Standards for financial management systems. (a) The Department... whenever practical. (b) Recipients' financial management systems shall provide for the following. (1...

  4. 29 CFR 95.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Standards for financial management systems. 95.21 Section 95... Requirements Financial and Program Management § 95.21 Standards for financial management systems. (a... practical. (b) Recipients' financial management systems shall provide for the following: (1) Accurate...

  5. 7 CFR 3019.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Standards for financial management systems. 3019.21... Requirements Financial and Program Management § 3019.21 Standards for financial management systems. (a) Federal... cost information whenever practical. (b) Recipients' financial management systems shall provide for the...

  6. 75 FR 21264 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Defense. A0030-22 AMC System name: Army Food Management Information System Records System location.... 9397, as amended. Purpose(s): The Army Food Management Information System will be used to automate the...: Supervisor, Army Food Management Information System, Program Manager, 401 First Street, Suite 157, Fort Lee...

  7. Transportation infrastructure : states' implementation of transportation management systems

    DOT National Transportation Integrated Search

    1997-01-13

    This report focuses on the U.S. General Accounting Office's ISTEA update of the states' implementation of pavement management systems, bridges, highway safety, congestion management systems, public transportation, and intermodal management systems. A...

  8. Intelligent community management system based on the devicenet fieldbus

    NASA Astrophysics Data System (ADS)

    Wang, Yulan; Wang, Jianxiong; Liu, Jiwen

    2013-03-01

    With the rapid development of the national economy and the improvement of people's living standards, people are making higher demands on the living environment. And the estate management content, management efficiency and service quality have been higher required. This paper in-depth analyzes about the intelligent community of the structure and composition. According to the users' requirements and related specifications, it achieves the district management systems, which includes Basic Information Management: the management level of housing, household information management, administrator-level management, password management, etc. Service Management: standard property costs, property charges collecting, the history of arrears and other property expenses. Security Management: household gas, water, electricity and security and other security management, security management district and other public places. Systems Management: backup database, restore database, log management. This article also carries out on the Intelligent Community System analysis, proposes an architecture which is based on B / S technology system. And it has achieved a global network device management with friendly, easy to use, unified human - machine interface.

  9. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  10. 5 CFR 430.304 - SES performance management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false SES performance management systems. 430.304 Section 430.304 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Managing Senior Executive Performance § 430.304 SES performance management systems. (a...

  11. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  12. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  13. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  14. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases with a geographical reference system that can be used to geolocate all database information. (e...

  15. The Management and Demonstration System at Murray State University.

    ERIC Educational Resources Information Center

    Schroeder, Gary G.

    The management system in use at the Murray State University Teacher Corps Project is described. The system uses management by objectives and the demonstration approach, and encourages managers to focus on the development and demonstration of ideas, processes, and structures. The system's operating concepts of time management and human resources…

  16. 5 CFR 297.103 - Designations of authority by system manager.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... manager. 297.103 Section 297.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE... system manager. The responsible Office system manager having jurisdiction over a system of records may designate in writing an Office employee to evaluate and issue the Office's decision on Privacy Act matters...

  17. 5 CFR 297.103 - Designations of authority by system manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... manager. 297.103 Section 297.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE... system manager. The responsible Office system manager having jurisdiction over a system of records may designate in writing an Office employee to evaluate and issue the Office's decision on Privacy Act matters...

  18. 5 CFR 297.103 - Designations of authority by system manager.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... manager. 297.103 Section 297.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE... system manager. The responsible Office system manager having jurisdiction over a system of records may designate in writing an Office employee to evaluate and issue the Office's decision on Privacy Act matters...

  19. 5 CFR 297.103 - Designations of authority by system manager.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... manager. 297.103 Section 297.103 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE... system manager. The responsible Office system manager having jurisdiction over a system of records may designate in writing an Office employee to evaluate and issue the Office's decision on Privacy Act matters...

  20. Correlation Research of Medical Security Management System Network Platform in Medical Practice

    NASA Astrophysics Data System (ADS)

    Jie, Wang; Fan, Zhang; Jian, Hao; Li-nong, Yu; Jun, Fei; Ping, Hao; Ya-wei, Shen; Yue-jin, Chang

    Objective-The related research of medical security management system network in medical practice. Methods-Establishing network platform of medical safety management system, medical security network host station, medical security management system(C/S), medical security management system of departments and sections, comprehensive query, medical security disposal and examination system. Results-In medical safety management, medical security management system can reflect the hospital medical security problem, and can achieve real-time detection and improve the medical security incident detection rate. Conclusion-The application of the research in the hospital management implementation, can find hospital medical security hidden danger and the problems of medical disputes, and can help in resolving medical disputes in time and achieve good work efficiency, which is worth applying in the hospital practice.

  1. 77 FR 49011 - Privacy Act of 1974; New System of Records, Office of General Counsel E-Discovery Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... System of Records, Office of General Counsel E-Discovery Management System--Change in Final Effective... the OGC E-Discovery Management System until after the opportunity for further comment is provided to... intent to establish a new system of records for OGC's E-Discovery Management System (EDMS), a system...

  2. 77 FR 68140 - Privacy Act of 1974; New System of Records, Office of General Counsel E-Discovery Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... System of Records, Office of General Counsel E-Discovery Management System: Republication of System... Counsel (OGC) E- Discovery Management System (EDMS). EDMS was first announced and described in a July 17... for OGC's E-Discovery Management System (OGC-EDMS), a system expected to significantly improve the...

  3. Information management

    NASA Technical Reports Server (NTRS)

    Ricks, Wendell; Corker, Kevin

    1990-01-01

    Primary Flight Display (PFD) information management and cockpit display of information management research is presented in viewgraph form. The information management problem in the cockpit, information management burdens, the key characteristics of an information manager, the interface management system handling the flow of information and the dialogs between the system and the pilot, and overall system architecture are covered.

  4. [The future of clinical laboratory database management system].

    PubMed

    Kambe, M; Imidy, D; Matsubara, A; Sugimoto, Y

    1999-09-01

    To assess the present status of the clinical laboratory database management system, the difference between the Clinical Laboratory Information System and Clinical Laboratory System was explained in this study. Although three kinds of database management systems (DBMS) were shown including the relational model, tree model and network model, the relational model was found to be the best DBMS for the clinical laboratory database based on our experience and developments of some clinical laboratory expert systems. As a future clinical laboratory database management system, the IC card system connected to an automatic chemical analyzer was proposed for personal health data management and a microscope/video system was proposed for dynamic data management of leukocytes or bacteria.

  5. 41 CFR 109-1.5205 - Personal property management system changes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Personal property management system changes. 109-1.5205 Section 109-1.5205 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS...

  6. 48 CFR 252.245-7003 - Contractor Property Management System Administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management System Administration. 252.245-7003 Section 252.245-7003 Federal Acquisition Regulations System... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.245-7003 Contractor Property Management System Administration. As prescribed in 245.107, insert the following clause: CONTRACTOR PROPERTY MANAGEMENT SYSTEM...

  7. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  8. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  9. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  10. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases with a common or coordinated reference system, that can be used to geolocate all database information...

  11. Medicinal animals used in ethnoveterinary practices of the 'Cariri Paraibano', NE Brazil

    PubMed Central

    2011-01-01

    Background Zootherapy is important in various socio-cultural environments, and innumerous examples of the use of animal derived remedies can currently be found in many urban, semi-urban and more remote localities in all parts of the world, particularly in developing countries. However, although a number of ethnobiological inventories concerning the use of medicinal animals in human health care have been compiled in Brazil in recent years, zootherapeutic practices in ethnoveterinary medicine (EVM) are poorly described and neglected in favor of human ethnomedicine. In this sense, the purpose of this study was to describe the local zootherapeutic practices in ethnoveterinary medicine of semi-arid of NE Brazil (Caatinga biome) and to contribute to future research about the validation of the effects and side effects of these animal products Methods The information obtained through semi-structured interviews was complemented by free interviews and informal conversations. A total of 67 people were interviewed (53 men and 14 women) about the use and commercialization of medicinal animals. To determine the relative importance of each local known species, their use-values (UV) were calculated. Diversity of species utilized was compared, between localities, using rarefaction curves and diversity estimate (Chao2) Results and Conclusions A total of 44 animal species (37 vertebrates and 7 invertebrates), distributed among 6 taxonomic categories were found to be used to treat 30 different ailments in livestock and pets. The results of our surveys revealed a rich traditional knowledge of local residents about the use of animals in traditional veterinary medicine. Although it is gradually being discontinued, the perceived efficacy, economic and geographic accessibility were main reasons for popularity of zootherapy in studied areas. PMID:21985401

  12. Design and implement of mobile equipment management system based on QRcode

    NASA Astrophysics Data System (ADS)

    Yu, Runze; Duan, Xiaohui; Jiao, Bingli

    2017-08-01

    A mobile equipment management system based on QRcode is proposed for remote and convenient device management. Unlike conventional systems, the system here makes managers accessible to real-time information with smart phones. Compared with the conventional method, which can only be operated with specific devices, this lightweight and efficient tele management mode is conducive to the asset management in multiple scenarios.

  13. 41 CFR 101-1.101 - Federal Property Management Regulations System.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Federal Property Management Regulations System. 101-1.101 Section 101-1.101 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1...

  14. 20 CFR 637.300 - Management systems, reporting and recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Management systems, reporting and... Standards and Procedures § 637.300 Management systems, reporting and recordkeeping. (a) The Governor shall ensure that the State's financial management system and recordkeeping system comply with subpart D of...

  15. 48 CFR 52.223-19 - Compliance with Environmental Management Systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Environmental Management Systems. 52.223-19 Section 52.223-19 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.223-19 Compliance with Environmental Management Systems. As prescribed in 23.903, insert the following clause: Compliance With Environmental Management Systems (May 2011) The Contractor's...

  16. 10 CFR 600.311 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Standards for financial management systems. 600.311... Requirements § 600.311 Standards for financial management systems. (a) Recipients are encouraged to use existing financial management systems to the extent that the systems comply with Generally Accepted...

  17. 10 CFR 600.311 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Standards for financial management systems. 600.311... Requirements § 600.311 Standards for financial management systems. (a) Recipients are encouraged to use existing financial management systems to the extent that the systems comply with Generally Accepted...

  18. Master's Degree in Management Information Systems with a Supply Chain Management Focus

    ERIC Educational Resources Information Center

    Ramaswamy, Kizhanatham V.; Boyd, Joseph L.; Desai, Mayur

    2007-01-01

    A graduate curriculum in Management Information Systems with a Supply Chain Management focus is presented. The motivation for this endeavor stems from the fact that the global scope of modern business organizations and the competitive environment in which they operate, requires an information system leveraged supply chain management system (SCM)…

  19. 33 CFR 96.220 - What makes up a safety management system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false What makes up a safety management... SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.220 What makes up a safety management system? (a) The...

  20. Planning and Resource Management in an Intelligent Automated Power Management System

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.

    1991-01-01

    Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

  1. SSCR Automated Manager (SAM) release 1. 1 reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-10-01

    This manual provides instructions for using the SSCR Automated Manager (SAM) to manage System Software Change Records (SSCRs) online. SSCRs are forms required to document all system software changes for the Martin Marietta Energy Systems, Inc., Central computer systems. SAM, a program developed at Energy Systems, is accessed through IDMS/R (Integrated Database Management System) on an IBM system.

  2. Computational fluid dynamics modeling of laminar, transitional, and turbulent flows with sensitivity to streamline curvature and rotational effects

    NASA Astrophysics Data System (ADS)

    Chitta, Varun

    Modeling of complex flows involving the combined effects of flow transition and streamline curvature using two advanced turbulence models, one in the Reynolds-averaged Navier-Stokes (RANS) category and the other in the hybrid RANS-Large eddy simulation (LES) category is considered in this research effort. In the first part of the research, a new scalar eddy-viscosity model (EVM) is proposed, designed to exhibit physically correct responses to flow transition, streamline curvature, and system rotation effects. The four equation model developed herein is a curvature-sensitized version of a commercially available three-equation transition-sensitive model. The physical effects of rotation and curvature (RC) enter the model through the added transport equation, analogous to a transverse turbulent velocity scale. The eddy-viscosity has been redefined such that the proposed model is constrained to reduce to the original transition-sensitive model definition in nonrotating flows or in regions with negligible RC effects. In the second part of the research, the developed four-equation model is combined with a LES technique using a new hybrid modeling framework, dynamic hybrid RANS-LES. The new framework is highly generalized, allowing coupling of any desired LES model with any given RANS model and addresses several deficiencies inherent in most current hybrid models. In the present research effort, the DHRL model comprises of the proposed four-equation model for RANS component and the MILES scheme for LES component. Both the models were implemented into a commercial computational fluid dynamics (CFD) solver and tested on a number of engineering and generic flow problems. Results from both the RANS and hybrid models show successful resolution of the combined effects of transition and curvature with reasonable engineering accuracy, and for only a small increase in computational cost. In addition, results from the hybrid model indicate significant levels of turbulent fluctuations in the flowfield, improved accuracy compared to RANS models predictions, and are obtained at a significant reduction of computational cost compared to full LES models. The results suggest that the advanced turbulence modeling techniques presented in this research effort have potential as practical tools for solving low/high Re flows over blunt/curved bodies for the prediction of transition and RC effects.

  3. Applying management information systems to staffing.

    PubMed

    Hanson, R L

    1982-10-01

    A management information system (MIS) is a tool for managing resources effectively. After reviewing some concepts and principles for effective data management, Hanson clearly applies the concepts to nurse staffing systems, which manage human resources. He defines a seven-step process for establishing an MIS, from defining the management objective to implementing the system. Pointing out that an MIS need not be computerized to be effective, Hanson presents a positive perspective and clarifies some often-misconceived notions about management information systems and the paper printouts they generate. In the next issue of JONA, a second article by Hanson will take a more detailed look at the variety, use, and usefulness of staffing statistics available from an MIS for staffing. These articles are based on material in a forthcoming book, Management Systems for Nursing Service Staffing, to be published by Aspen Systems Corporation, Rockville, Maryland.

  4. Case management information systems: how to put the pieces together now and beyond year 2000.

    PubMed

    Matthews, Pamela

    2002-01-01

    The case management process is a critical management and operational component in the delivery of customer services across the patient care continuum. Case management has transcended time and will continue to be a viable infrastructure process for successful organizations in the future. A key component of the case management infrastructure is information systems and technology support. Case management challenges include effective deployment and use of systems and technology. As more sophisticated, integrated systems are made available, case managers can use these tools to continue to expand effectively beyond the patient's episodic event to provide greater levels of cradle-to-grave management of healthcare. This article explores methods for defining case management system needs and identifying automation options available to the case manager.

  5. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its performance management system(s), DHS must— (a) Transfer ratings between subordinate organizations and to... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM...

  6. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its performance management system(s), DHS must— (a) Transfer ratings between subordinate organizations and to... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM...

  7. 5 CFR 9701.410 - DHS responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.410 DHS responsibilities. In carrying out its performance management system(s), DHS must— (a) Transfer ratings between subordinate organizations and to... 9701.410 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM...

  8. Microcomputer Database Management Systems for Bibliographic Data.

    ERIC Educational Resources Information Center

    Pollard, Richard

    1986-01-01

    Discusses criteria for evaluating microcomputer database management systems (DBMS) used for storage and retrieval of bibliographic data. Two popular types of microcomputer DBMS--file management systems and relational database management systems--are evaluated with respect to these criteria. (Author/MBR)

  9. 5 CFR 9701.405 - Performance management system requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements. 9701.405 Section 9701.405 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM Performance Management § 9701.405 Performance...

  10. 32 CFR 34.23 - Property management system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Property management system. 34.23 Section 34.23... Requirements Property Standards § 34.23 Property management system. The recipient's property management system... control system shall be in effect to insure adequate safeguards to prevent loss, damage, or theft of the...

  11. 10 CFR 600.323 - Property management system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Property management system. 600.323 Section 600.323 Energy....323 Property management system. The recipient's property management system must include the following... existence, current utilization, and continued need for the property. (d) A control system must be in effect...

  12. The Implementation of an Office Systems Management Curriculum for the 1980s.

    ERIC Educational Resources Information Center

    Stallard, John J.

    1982-01-01

    Describes the implementation of an office systems management curriculum (at the University of Tennessee, Knoxville) that trains students to develop their conceptual skills and to train for management-level positions. Courses involve the automated office, records systems, office systems analysis, case studies, and management information systems.…

  13. 32 CFR 34.23 - Property management system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Property management system. 34.23 Section 34.23... Requirements Property Standards § 34.23 Property management system. The recipient's property management system... control system shall be in effect to insure adequate safeguards to prevent loss, damage, or theft of the...

  14. 10 CFR 600.323 - Property management system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Property management system. 600.323 Section 600.323 Energy....323 Property management system. The recipient's property management system must include the following... existence, current utilization, and continued need for the property. (d) A control system must be in effect...

  15. Systems Management of Air Force Standard Communications-Computer systems: There is a Better Way

    DTIC Science & Technology

    1988-04-01

    upgrade or replacement of systems. AFR 700-6, Information Systems Operation Management , AFR 700-7, Information Processing Center Opera- tions Management...and AFR 700-8, Telephone Systems Operation Management provide USAF guidance, policy and procedures governing this phase. 4 2. 800-Series Regulations

  16. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  17. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  18. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  19. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  20. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  1. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  2. 48 CFR 352.234-4 - Partial earned value management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system. 352.234-4 Section 352.234-4 Federal Acquisition Regulations System HEALTH AND HUMAN....234-4 Partial earned value management system. As prescribed in 334.203-70(d), the Contracting Officer shall insert the following clause: Partial Earned Value Management System (October 2008) (a) The...

  3. 48 CFR 352.234-3 - Full earned value management system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management system. 352.234-3 Section 352.234-3 Federal Acquisition Regulations System HEALTH AND HUMAN....234-3 Full earned value management system. As prescribed in 334.203-70(c), the Contracting Officer shall insert the following clause: Full Earned Value Management System (October 2008) (a) The Contractor...

  4. 48 CFR 252.234-7001 - Notice of Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Industries Alliance Standard 748, Earned Value Management Systems (ANSI/EIA-748) (current version at time of... Management System. 252.234-7001 Section 252.234-7001 Federal Acquisition Regulations System DEFENSE... CLAUSES Text of Provisions And Clauses 252.234-7001 Notice of Earned Value Management System. As...

  5. 36 CFR 212.5 - Road system management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... safety or to environmental degradation. (c) Cost recovery on National Forest System roads. The Chief may... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Road system management. 212.5... MANAGEMENT Administration of the Forest Transportation System § 212.5 Road system management. (a) Traffic...

  6. Current Standardization and Cooperative Efforts Related to Industrial Information Infrastructures.

    DTIC Science & Technology

    1993-05-01

    Data Management Systems: Components used to store, manage, and retrieve data. Data management includes knowledge bases, database management...Application Development Tools and Methods X/Open and POSIX APIs Integrated Design Support System (IDS) Knowledge -Based Systems (KBS) Application...IDEFlx) Yourdon Jackson System Design (JSD) Knowledge -Based Systems (KBSs) Structured Systems Development (SSD) Semantic Unification Meta-Model

  7. Integrated management system: The integration of ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000

    NASA Astrophysics Data System (ADS)

    Muzaimi, Hafizzudin; Chew, Boon Cheong; Hamid, Syaiful Rizal

    2017-03-01

    The implementation of integrated management system (IMS) for better quality management has become a preference for many organizations. This can be seen as many organizations used the combination of quality ISO 9001, an environment ISO 14001 and occupational health and safety management system OHSAS 18001 as a core for the IMS that largely implemented. Besides, the linked between quality management with risk management system need to be identified as the management system that enhance the effectiveness of IMS. Therefore, the risk management system ISO 31000 also presented as a part of integration. In nowadays competitive environment, the increasing pressure and needs from customer or stakeholders make it compulsory for the organization to propose the new system and standards. This paper presents and discusses about the benefit of integration, the management system components that can be converged and the implementation approach. A series of interview was conducted through in-depth interviews with 8 experts in this field, while data collected were analyzed qualitatively. The results consist of 16 factors of IMS implementation that have been identified and the use of PDCA approach for an effective implementation of IMS. As a conclusion, the paper proposes the integration of four management systems (ISO 9001, ISO 14001, OHSAS 18001 and ISO 31000) and on how the IMS can be used to structure the process of management for quality management towards sustainability practices in the organization.

  8. Fit for purpose quality management system for military forensic exploitation.

    PubMed

    Wilson, Lauren Elizabeth; Gahan, Michelle Elizabeth; Robertson, James; Lennard, Chris

    2018-03-01

    In a previous publication we described a systems approach to forensic science applied in the military domain. The forensic science 'system of systems' describes forensic science as a sub-system in the larger criminal justice, law enforcement, intelligence, and military systems, with quality management being an important supporting system. Quality management systems help to ensure that organisations achieve their objective and continually improve their capability. Components of forensic science quality management systems can include standardisation of processes, accreditation of facilities to national/international standards, and certification of personnel. A fit for purpose quality management system should be balanced to allow organisations to meet objectives, provide continuous improvement; mitigate risk; and impart a positive quality culture. Considerable attention over the last decades has been given to the need for forensic science quality management systems to meet criminal justice and law enforcement objectives. More recently, the need for the forensic quality management systems to meet forensic intelligence objectives has been considered. This paper, for the first time, discusses the need for a fit for purpose quality management system for military forensic exploitation. Crown Copyright © 2018. Published by Elsevier B.V. All rights reserved.

  9. Analysis of the Apollo spacecraft operational data management system. Executive summary

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A study was made of Apollo, Skylab, and several other data management systems to determine those techniques which could be applied to the management of operational data for future manned spacecraft programs. The results of the study are presented and include: (1) an analysis of present data management systems, (2) a list of requirements for future operational data management systems, (3) an evaluation of automated data management techniques, and (4) a plan for data management applicable to future space programs.

  10. 30 CFR 585.810 - What must I include in my Safety Management System?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., COPs and GAPs Safety Management Systems § 585.810 What must I include in my Safety Management System? You must submit a description of the Safety Management System you will use with your COP (provided...

  11. 30 CFR 585.810 - What must I include in my Safety Management System?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., COPs and GAPs Safety Management Systems § 585.810 What must I include in my Safety Management System? You must submit a description of the Safety Management System you will use with your COP (provided...

  12. 30 CFR 585.810 - What must I include in my Safety Management System?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., COPs and GAPs Safety Management Systems § 585.810 What must I include in my Safety Management System? You must submit a description of the Safety Management System you will use with your COP (provided...

  13. Management advisory memorandum on National Airspace System infrastructure management system prototype, Federal Aviation Administration

    DOT National Transportation Integrated Search

    1997-03-01

    This is our Management Advisory Memorandum on the National Airspace : System (NAS) Infrastructure Management System (NIMS) prototype : project in the Federal Aviation Administration (FAA). Our review was : initiated in response to a hotline complaint...

  14. 23 CFR 971.204 - Management systems requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS FOREST SERVICE... maintain the management systems and their associated databases; and (5) A process for data collection, processing, analysis, and updating for each management system. (c) All management systems will use databases...

  15. 23 CFR 970.204 - Management systems requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION FEDERAL LANDS HIGHWAYS NATIONAL PARK... the management systems and their associated databases; and (5) A process for data collection, processing, analysis and updating for each management system. (d) All management systems will use databases...

  16. A Study of MX Environmental Management Information System (MXEMIS) Needs.

    DTIC Science & Technology

    1983-12-01

    ENVIRONMENTAL MANAGEMENT INFORMATION SYSTEM (MXEMIS) NEEDS by Ronald Webster Ralph Mitchell Valorie Young -J : 2 34 LA--. Approved for public release...System (SAIFS) The MX Management Information System (MX MIS) The Mobilization Early Warning System (MEWS) The Computer-Aided Environmental Baseline...26 REFERENCES DISTRIBUTION I5 S’ t A STUDY OF MX ENVIRONMENTAL 2 EXISTING SYSTEMS CLASSIFICATION MANAGEMENT INFORMATION SYSTEM (MXEMIS

  17. The importance of management information systems in a managed care environment.

    PubMed

    Porro, M R; Brill, K R

    1995-06-01

    Keys to successful information systems for home care providers are planning and control. With managed care's emphasis on data, agencies need to have information systems that can handle the demands managed care puts on agencies today--planning before hurrying to install a system will ensure control as the managed care contracts add up.

  18. Use of electronic information systems in nursing management.

    PubMed

    Lammintakanen, Johanna; Saranto, Kaija; Kivinen, Tuula

    2010-05-01

    The purpose of this study is to describe nurse managers' perceptions of the use of electronic information systems in their daily work. Several kinds of software are used for administrative and information management purposes in health care organizations, but the issue has been studied less from nurse managers' perspective. The material for this qualitative study was acquired according to the principles of focus group interview. Altogether eight focus groups were held with 48 nurse managers from both primary and specialized health care organizations. The nurse managers were asked in focus groups to describe the use of information systems in their daily work in addition to some other themes. The material was analyzed by inductive content analysis using ATLAS.ti computer program. The main category "pros and cons of using information systems in nursing management" summarized the nurse managers' perceptions of using electronic information systems. The main category consisted of three sub-categories: (1) nurse managers' perceptions of the use of information technology; (2) usability of management information systems; (3) development of personnel competencies and work processes. The nurse managers made several comments on the implementation of immature electronic information systems which caused inefficiencies in working processes. However, they considered electronic information systems to be essential elements of their daily work. Furthermore, the nurse managers' descriptions of the pros and cons of using information systems reflected partly the shortcomings of strategic management and lack of coordination in health care organizations. Copyright 2010 Elsevier Ireland Ltd. All rights reserved.

  19. Knowledge-based systems for power management

    NASA Technical Reports Server (NTRS)

    Lollar, L. F.

    1992-01-01

    NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.

  20. Toward information management in corporations (2)

    NASA Astrophysics Data System (ADS)

    Shibata, Mitsuru

    If construction of inhouse information management systems in an advanced information society should be positioned along with the social information management, its base making begins with reviewing current paper filing systems. Since the problems which inhere in inhouse information management systems utilizing OA equipments also inhere in paper filing systems, the first step toward full scale inhouse information management should be to grasp and solve the fundamental problems in current filing systems. This paper describes analysis of fundamental problems in filing systems, making new type of offices and analysis of improvement needs in filing systems, and some points in improving filing systems.

  1. 75 FR 68418 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-08

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...) to establish a Real-Time System Management Information Program that provides, in all States, the... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  2. 20 CFR 633.311 - Management information systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  3. 76 FR 42536 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  4. 41 CFR 101-39.102 - Determinations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-INTERAGENCY FLEET MANAGEMENT SYSTEMS 39.1-Establishment, Modification, and Discontinuance of Interagency Fleet Management Systems § 101-39.102 Determinations. Each determination to establish a fleet management system... name of the executive agency designated to be responsible for operating the fleet management system and...

  5. 48 CFR 970.3270 - Standard financial management clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management and operating contracts with integrated accounting systems. (iv) The contracting officer shall... systems: (1) 970.5232-7, Financial management system. (2) 970.5232-8, Integrated accounting. (c) Any... management clauses. 970.3270 Section 970.3270 Federal Acquisition Regulations System DEPARTMENT OF ENERGY...

  6. 48 CFR 970.3270 - Standard financial management clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... management and operating contracts with integrated accounting systems. (iv) The contracting officer shall... systems: (1) 970.5232-7, Financial management system. (2) 970.5232-8, Integrated accounting. (c) Any... management clauses. 970.3270 Section 970.3270 Federal Acquisition Regulations System DEPARTMENT OF ENERGY...

  7. 48 CFR 970.3270 - Standard financial management clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... management and operating contracts with integrated accounting systems. (iv) The contracting officer shall... systems: (1) 970.5232-7, Financial management system. (2) 970.5232-8, Integrated accounting. (c) Any... management clauses. 970.3270 Section 970.3270 Federal Acquisition Regulations System DEPARTMENT OF ENERGY...

  8. 48 CFR 970.3270 - Standard financial management clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management and operating contracts with integrated accounting systems. (iv) The contracting officer shall... systems: (1) 970.5232-7, Financial management system. (2) 970.5232-8, Integrated accounting. (c) Any... management clauses. 970.3270 Section 970.3270 Federal Acquisition Regulations System DEPARTMENT OF ENERGY...

  9. Selecting Data-Base Management Software for Microcomputers in Libraries and Information Units.

    ERIC Educational Resources Information Center

    Pieska, K. A. O.

    1986-01-01

    Presents a model for the evaluation of database management systems software from the viewpoint of librarians and information specialists. The properties of data management systems, database management systems, and text retrieval systems are outlined and compared. (10 references) (CLB)

  10. 20 CFR 633.311 - Management information systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  11. 20 CFR 633.311 - Management information systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  12. The SysMan monitoring service and its management environment

    NASA Astrophysics Data System (ADS)

    Debski, Andrzej; Janas, Ekkehard

    1996-06-01

    Management of modern information systems is becoming more and more complex. There is a growing need for powerful, flexible and affordable management tools to assist system managers in maintaining such systems. It is at the same time evident that effective management should integrate network management, system management and application management in a uniform way. Object oriented OSI management architecture with its four basic modelling concepts (information, organization, communication and functional models) together with widely accepted distribution platforms such as ANSA/CORBA, constitutes a reliable and modern framework for the implementation of a management toolset. This paper focuses on the presentation of concepts and implementation results of an object oriented management toolset developed and implemented within the framework of the ESPRIT project 7026 SysMan. An overview is given of the implemented SysMan management services including the System Management Service, Monitoring Service, Network Management Service, Knowledge Service, Domain and Policy Service, and the User Interface. Special attention is paid to the Monitoring Service which incorporates the architectural key entity responsible for event management. Its architecture and building components, especially filters, are emphasized and presented in detail.

  13. 41 CFR 101-30.101-13 - Management data.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....101-13 Section 101-30.101-13 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... to the individual agency's supply system for purposes of supply management as standardization, source...

  14. 41 CFR 101-30.101-13 - Management data.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....101-13 Section 101-30.101-13 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... to the individual agency's supply system for purposes of supply management as standardization, source...

  15. 41 CFR 101-30.101-13 - Management data.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....101-13 Section 101-30.101-13 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... to the individual agency's supply system for purposes of supply management as standardization, source...

  16. Adapting inland fisheries management to a changing climate

    USGS Publications Warehouse

    Paukert, Craig P.; Glazer, Bob A.; Hansen, Gretchen J. A.; Irwin, Brian J.; Jacobson, Peter C.; Kershner, Jeffrey L.; Shuter, Brian J.; Whitney, James E.; Lynch, Abigail J.

    2016-01-01

    Natural resource decision makers are challenged to adapt management to a changing climate while balancing short-term management goals with long-term changes in aquatic systems. Adaptation will require developing resilient ecosystems and resilient management systems. Decision makers already have tools to develop or ensure resilient aquatic systems and fisheries such as managing harvest and riparian zones. Because fisheries management often interacts with multiple stakeholders, adaptation strategies involving fisheries managers and other partners focused on land use, policy, and human systems, coupled with long-term monitoring, are necessary for resilient systems. We show how agencies and organizations are adapting to a changing climate in Minnesota and Ontario lakes and Montana streams. We also present how the Florida Fish and Wildlife Commission created a management structure to develop adaptation strategies. These examples demonstrate how organizations and agencies can cope with climate change effects on fishes and fisheries through creating resilient management and ecological systems.

  17. The Air Program Information Management System (APIMS)

    DTIC Science & Technology

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  18. Integrated, automated revenue management for managed care contracts.

    PubMed

    Burckhart, Kent

    2002-04-01

    Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.

  19. Proactive pavement asset management with climate change aspects

    NASA Astrophysics Data System (ADS)

    Zofka, Adam

    2018-05-01

    Pavement Asset Management System is a systematic and objective tool to manage pavement network based on the rational, engineering and economic principles. Once implemented and mature Pavement Asset Management System serves the entire range of users starting with the maintenance engineers and ending with the decision-makers. Such a system is necessary to coordinate agency management strategy including proactive maintenance. Basic inputs in the majority of existing Pavement Asset Management System approaches comprise the actual pavement inventory with associated construction history and condition, traffic information as well as various economical parameters. Some Pavement Management System approaches include also weather aspects which is of particular importance considering ongoing climate changes. This paper presents challenges in implementing the Pavement Asset Management System for those National Road Administrations that manage their pavement assets using more traditional strategies, e.g. worse-first approach. Special considerations are given to weather-related inputs and associated analysis to demonstrate the effects of climate change in a short- and long-term range. Based on the presented examples this paper concludes that National Road Administrations should account for the weather-related factors in their Pavement Management Systems as this has a significant impact on the system outcomes from the safety and economical perspective.

  20. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  1. 23 CFR 500.109 - CMS.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    .... Congestion management means the application of strategies to improve system performance and reliability by... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at... management system or process is a systematic and regionally accepted approach for managing congestion that...

  2. 23 CFR 500.109 - CMS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... Congestion management means the application of strategies to improve system performance and reliability by... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at... management system or process is a systematic and regionally accepted approach for managing congestion that...

  3. 20 CFR 632.32 - Financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  4. 14 CFR 152.303 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...

  5. 23 CFR 500.109 - CMS.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at.... Congestion management means the application of strategies to improve system performance and reliability by... management system or process is a systematic and regionally accepted approach for managing congestion that...

  6. 23 CFR 500.109 - CMS.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at.... Congestion management means the application of strategies to improve system performance and reliability by... management system or process is a systematic and regionally accepted approach for managing congestion that...

  7. 23 CFR 500.109 - CMS.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... SYSTEMS Management Systems § 500.109 CMS. (a) For purposes of this part, congestion means the level at.... Congestion management means the application of strategies to improve system performance and reliability by... management system or process is a systematic and regionally accepted approach for managing congestion that...

  8. 7 CFR 246.13 - Financial management system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Financial management system. 246.13 Section 246.13... State Agency Provisions § 246.13 Financial management system. (a) Disclosure of expenditures. The State agency shall maintain a financial management system which provides accurate, current and complete...

  9. 7 CFR 246.13 - Financial management system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Financial management system. 246.13 Section 246.13... State Agency Provisions § 246.13 Financial management system. (a) Disclosure of expenditures. The State agency shall maintain a financial management system which provides accurate, current and complete...

  10. 7 CFR 246.13 - Financial management system.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Financial management system. 246.13 Section 246.13... State Agency Provisions § 246.13 Financial management system. (a) Disclosure of expenditures. The State agency shall maintain a financial management system which provides accurate, current and complete...

  11. 29 CFR 1470.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 4 2013-07-01 2013-07-01 false Standards for financial management systems. 1470.20 Section... Post-Award Requirements Financial Administration § 1470.20 Standards for financial management systems... the restrictions and prohibitions of applicable statutes. (b) The financial management systems of...

  12. 29 CFR 1470.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 4 2012-07-01 2012-07-01 false Standards for financial management systems. 1470.20 Section... Post-Award Requirements Financial Administration § 1470.20 Standards for financial management systems... the restrictions and prohibitions of applicable statutes. (b) The financial management systems of...

  13. 7 CFR 246.13 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Financial management system. 246.13 Section 246.13... State Agency Provisions § 246.13 Financial management system. (a) Disclosure of expenditures. The State agency shall maintain a financial management system which provides accurate, current and complete...

  14. 20 CFR 632.32 - Financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  15. 14 CFR 152.303 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...

  16. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  17. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  18. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  19. 46 CFR 16.500 - Management Information System requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Management Information System requirements. 16.500 Section 16.500 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Management Information System § 16.500 Management Information System requirements. (a...

  20. Course Management Systems for Learning: Beyond Accidental Pedagogy

    ERIC Educational Resources Information Center

    McGee, Patricia; Carmean, Colleen; Jafari, Ali

    2005-01-01

    "Course Management Systems for Learning: Beyond Accidental Pedagogy" is a comprehensive overview of standards, practices and possibilities of course management systems in higher education. "Course Management Systems for Learning: Beyond Accidental Pedagogy" focuses on what the current knowledge is (in best practices, research, standards and…

  1. A design for a new catalog manager and associated file management for the Land Analysis System (LAS)

    NASA Technical Reports Server (NTRS)

    Greenhagen, Cheryl

    1986-01-01

    Due to the larger number of different types of files used in an image processing system, a mechanism for file management beyond the bounds of typical operating systems is necessary. The Transportable Applications Executive (TAE) Catalog Manager was written to meet this need. Land Analysis System (LAS) users at the EROS Data Center (EDC) encountered some problems in using the TAE catalog manager, including catalog corruption, networking difficulties, and lack of a reliable tape storage and retrieval capability. These problems, coupled with the complexity of the TAE catalog manager, led to the decision to design a new file management system for LAS, tailored to the needs of the EDC user community. This design effort, which addressed catalog management, label services, associated data management, and enhancements to LAS applications, is described. The new file management design will provide many benefits including improved system integration, increased flexibility, enhanced reliability, enhanced portability, improved performance, and improved maintainability.

  2. Rhode Island congestion management plan : executive summary

    DOT National Transportation Integrated Search

    1997-09-01

    This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...

  3. Case Studies of Ecological Integrative Information Systems: The Luquillo and Sevilleta Information Management Systems

    NASA Astrophysics Data System (ADS)

    San Gil, Inigo; White, Marshall; Melendez, Eda; Vanderbilt, Kristin

    The thirty-year-old United States Long Term Ecological Research Network has developed extensive metadata to document their scientific data. Standard and interoperable metadata is a core component of the data-driven analytical solutions developed by this research network Content management systems offer an affordable solution for rapid deployment of metadata centered information management systems. We developed a customized integrative metadata management system based on the Drupal content management system technology. Building on knowledge and experience with the Sevilleta and Luquillo Long Term Ecological Research sites, we successfully deployed the first two medium-scale customized prototypes. In this paper, we describe the vision behind our Drupal based information management instances, and list the features offered through these Drupal based systems. We also outline the plans to expand the information services offered through these metadata centered management systems. We will conclude with the growing list of participants deploying similar instances.

  4. The success of a management information system in health care - a case study from Finland.

    PubMed

    Kivinen, Tuula; Lammintakanen, Johanna

    2013-02-01

    The purpose of this article is to describe perspectives on information availability and information use among users of a management information system in one specialized health care organization. The management information system (MIS) is defined as the information system that provides management with information about financial and operational aspects of hospital management. The material for this qualitative case study was gathered by semi-structured interviews. The interviewees were purposefully selected from one specialized health care organization. The organization has developed its management information system in recent years. Altogether 13 front-line, middle and top-level managers were interviewed. The two themes discussed were information availability and information use. The data were analyzed using inductive content analysis using ATLAS.ti computer program. The main category "usage of management information system" consisted of four sub-categories: (1) system quality, (2) information quality, (3) use and user satisfaction and (4) development of information culture. There were many organizational and cultural aspects which influence the use of MIS in addition to factors concerning system usability and users. The connection between information culture and information use was recognized and the managers proposed numerous ways to increase the use of information in management work. The implementation and use of management information system did not seem to be planned as an essential tool in strategic information management in the health care organization studied. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  5. Cancer Care Ontario and integrated cancer programs: portrait of a performance management system and lessons learned.

    PubMed

    Cheng, Siu Mee; Thompson, Leslee J

    2006-01-01

    A performance management system has been implemented by Cancer Care Ontario (CCO). This system allows for the monitoring and management of 11 integrated cancer programs (ICPs) across the Province of Ontario. The system comprises of four elements: reporting frequency, reporting requirements, review meetings and accountability and continuous improvement activities. CCO and the ICPs have recently completed quarterly performance review exercises for the last two quarters of the fiscal year 2004-2005. The purpose of this paper is to address some of the key lessons learned. The paper provides an outline of the CCO performance management system. These lessons included: data must be valid and reliable; performance management requires commitments from both parties in the performance review exercises; streamlining performance reporting is beneficial; technology infrastructure which allows for cohesive management of data is vital for a sustainable performance management system; performance indicators need to stand up to scrutiny by both parties; and providing comparative data across the province is valuable. Critical success factors which would help to ensure a successful performance management system include: corporate engagement from various parts of an organization in the review exercises; desire to focus on performance improvement and avoidance of blaming; and strong data management systems. The performance management system is a practical and sustainable system that allows for performance improvement of cancer care services. It can be a vital tool to enhance accountability within the health care system. The paper demonstrates that the performance management system supports accountability in the cancer care system for Ontario, and reflects the principles of the provincial governments commitment to continuous improvement of healthcare.

  6. Department of Defense Healthcare Management System Modernization (DHMSM)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Department of Defense Healthcare Management System Modernization (DHMSM) Defense...DSN Fax: Date Assigned: November 16, 2015 Program Information Program Name Department of Defense Healthcare Management System Modernization...DHMSM) DoD Component DoD The acquiring DoD Component is Program Executive Office (PEO) Department of Defense (DoD) Healthcare Management Systems (DHMS

  7. Management Information Systems, Planning, and Public Community Colleges.

    ERIC Educational Resources Information Center

    Ritch, Stephen W.; Munro, Robert J.

    Management Information Systems (MIS), originally developed in the areas of accounting, management science, and computer processing, are now being applied to decision-making in educational settings. Definitions of MIS are numerous and often vague, but management systems (as distinguished from other information systems) should promote real-time…

  8. Advanced Grid Control Technologies Workshop Series | Energy Systems

    Science.gov Websites

    on advanced distribution management systems (ADMS) and microgrid controls. The workshops were held at . July 7, 2015: Advanced Distribution Management Systems (ADMS) Welcome and NREL Overview Dr. Murali Keynote: Next-Generation Distribution Management Systems and Distributed Resource Energy Management

  9. 20 CFR 437.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Standards for financial management systems... Financial Administration § 437.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  10. 45 CFR 92.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Standards for financial management systems. 92.20...-Award Requirements Financial Administration § 92.20 Standards for financial management systems. (a) A... restrictions and prohibitions of applicable statutes. (b) The financial management systems of other grantees...

  11. 14 CFR 1273.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Standards for financial management systems... Requirements Financial Administration § 1273.20 Standards for financial management systems. (a) A State must... prohibitions of applicable statutes. (b) The financial management systems of other grantees and subgrantees...

  12. 45 CFR 92.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Standards for financial management systems. 92.20...-Award Requirements Financial Administration § 92.20 Standards for financial management systems. (a) A... restrictions and prohibitions of applicable statutes. (b) The financial management systems of other grantees...

  13. 20 CFR 437.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Standards for financial management systems... Financial Administration § 437.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  14. 14 CFR 1273.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Standards for financial management systems... Requirements Financial Administration § 1273.20 Standards for financial management systems. (a) A State must... prohibitions of applicable statutes. (b) The financial management systems of other grantees and subgrantees...

  15. 20 CFR 437.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Standards for financial management systems... Financial Administration § 437.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  16. 20 CFR 437.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Standards for financial management systems... Financial Administration § 437.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  17. 14 CFR § 1273.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Standards for financial management systems... Post-Award Requirements Financial Administration § 1273.20 Standards for financial management systems... the restrictions and prohibitions of applicable statutes. (b) The financial management systems of...

  18. 49 CFR 19.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Standards for financial management systems. 19.21... ORGANIZATIONS Post-Award Requirements § 19.21 Standards for financial management systems. (a) Federal awarding... information whenever practical. (b) Recipients' financial management systems shall provide for the following...

  19. 14 CFR 1260.121 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Standards for financial management systems... Requirements § 1260.121 Standards for financial management systems. (a) Recipients shall relate financial data...) Recipients' financial management systems shall provide for the following. (1) Accurate, current and complete...

  20. 7 CFR 550.20 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Standards for financial management systems. 550.20... Management of Agreements Financial Management § 550.20 Standards for financial management systems. (a) REE agencies shall require Cooperators to relate financial data to performance data. (b) Cooperators' financial...

  1. 41 CFR 101-39.200 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services § 101-39.200 Scope. This subpart... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Scope. 101-39.200 Section 101-39.200 Public Contracts and Property Management Federal Property Management Regulations System...

  2. 41 CFR 101-39.200 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services § 101-39.200 Scope. This subpart... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Scope. 101-39.200 Section 101-39.200 Public Contracts and Property Management Federal Property Management Regulations System...

  3. 41 CFR 101-39.200 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANAGEMENT SYSTEMS 39.2-GSA Interagency Fleet Management System Services § 101-39.200 Scope. This subpart... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Scope. 101-39.200 Section 101-39.200 Public Contracts and Property Management Federal Property Management Regulations System...

  4. 76 FR 47516 - Personnel Management in Agencies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... management, in accordance with merit system principles. Sec. 250.205 Systems and standards. The five human... effective human capital management in accordance with the merit system principles and in compliance with... OFFICE OF PERSONNEL MANAGEMENT 5 CFR PART 250 RIN 3206-AL98 Personnel Management in Agencies...

  5. 40 CFR 30.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Standards for financial management... Program Management § 30.21 Standards for financial management systems. (a) EPA shall require recipients to...) Recipients' financial management systems shall provide for the following. (1) Accurate, current and complete...

  6. 32 CFR 34.11 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Standards for financial management systems. 34... ORGANIZATIONS Post-award Requirements Financial and Program Management § 34.11 Standards for financial management systems. (a) Recipients shall be allowed and encouraged to use existing financial management...

  7. 41 CFR 105-72.301 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Standards for financial... Management § 105-72.301 Standards for financial management systems. (a) Federal awarding agencies shall... practical. (b) Recipients' financial management systems shall provide for the following. (1) Accurate...

  8. 7 CFR 550.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Standards for financial management systems. 550.20... Management of Agreements Financial Management § 550.20 Standards for financial management systems. (a) REE agencies shall require Cooperators to relate financial data to performance data. (b) Cooperators' financial...

  9. Design and realization of high quality prime farmland planning and management information system

    NASA Astrophysics Data System (ADS)

    Li, Manchun; Liu, Guohong; Liu, Yongxue; Jiang, Zhixin

    2007-06-01

    The article discusses the design and realization of a high quality prime farmland planning and management information system based on SDSS. Models in concept integration, management planning are used in High Quality Prime Farmland Planning in order to refine the current model system and the management information system is deigned with a triangular structure. Finally an example of Tonglu county high quality prime farmland planning and management information system is introduced.

  10. Navy Occupational Health Information Management System (NOHIMS). System-Wide Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOHIMS SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL JUNE 1987 DTIC 00 SEP I 21988DJ 0) 4... INFORMATION MANAGEMENT SYSTEM (NOHIMS) N 1.98 SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL 7. Author(s) a. Performing Organization Rapt. No. MITRE... Management System (NOHIMS). NORIMS, whose initial version was ,eveloped at the Naval Health Research Center (NHRC), is a composite of 4 -’o subsystems: an

  11. A new specimen management system using RFID technology.

    PubMed

    Shim, Hun; Uh, Young; Lee, Seung Hwan; Yoon, Young Ro

    2011-12-01

    The specimen management system with barcode needs to be improved in order to solve inherent problems in work performance. This study describes the application of Radio Frequency Identification (RFID) which is the solution for the problems associated with specimen labeling and management. A new specimen management system and architecture with RFID technology for clinical laboratory was designed. The suggested system was tested in various conditions such as durability to temperature and aspect of effective utilization of new work flow under a virtual hospital clinical laboratory environment. This system demonstrates its potential application in clinical laboratories for improving work flow and specimen management. The suggested specimen management system with RFID technology has advantages in comparison to the traditional specimen management system with barcode in the aspect of mass specimen processing, robust durability of temperature, humidity changes, and effective specimen tracking.

  12. Organizational technologies of chronic disease management programs in large rural multispecialty group practice systems.

    PubMed

    Gamm, Larry; Bolin, Jane Nelson; Kash, Bita A

    2005-01-01

    Four large rural multispecialty group practice systems employ a mix of organizational technologies to provide chronic disease management with measurable impacts on their patient populations and costs. Four technologies-administrative, clinical, information, and social-are proposed as key dimensions for examining disease management programs. The benefits of disease management are recognized by these systems despite marked variability in the organization of the programs. Committees spanning health plans and clinics in the 4 systems and electronic medical records and/or other disease management information systems are important coordinating mechanisms. Increased reliance on nurses for patient education and care coordination in all 4 systems reflects significant extension of clinical and social technologies in the management of patient care. The promise of disease management as offered by these systems and other auspices are considered.

  13. Distributed Information System Development: Review of Some Management Issues

    NASA Astrophysics Data System (ADS)

    Mishra, Deepti; Mishra, Alok

    Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.

  14. Recommendation System Based On Association Rules For Distributed E-Learning Management Systems

    NASA Astrophysics Data System (ADS)

    Mihai, Gabroveanu

    2015-09-01

    Traditional Learning Management Systems are installed on a single server where learning materials and user data are kept. To increase its performance, the Learning Management System can be installed on multiple servers; learning materials and user data could be distributed across these servers obtaining a Distributed Learning Management System. In this paper is proposed the prototype of a recommendation system based on association rules for Distributed Learning Management System. Information from LMS databases is analyzed using distributed data mining algorithms in order to extract the association rules. Then the extracted rules are used as inference rules to provide personalized recommendations. The quality of provided recommendations is improved because the rules used to make the inferences are more accurate, since these rules aggregate knowledge from all e-Learning systems included in Distributed Learning Management System.

  15. 41 CFR 101-1.109 - Numbering in FPMR System.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Numbering in FPMR System. 101-1.109 Section 101-1.109 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation System § 101...

  16. 41 CFR 101-1.105 - Authority for FPMR System.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Authority for FPMR System. 101-1.105 Section 101-1.105 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation System § 101...

  17. 78 FR 12344 - Wekiva River System Advisory Management Committee Meetings (FY2013)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... River System Advisory Management Committee. DATES: The meetings are scheduled for: April 3, 2013; June 4... meeting will result in decisions and steps that advance the Wekiva River System Advisory Management... Wekiva River System Advisory Management Committee, National Park Service, 5342 Clark Road, PMB 123...

  18. 20 CFR 627.425 - Standards for financial management and participant data systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Standards for financial management and... Administrative Standards § 627.425 Standards for financial management and participant data systems. (a)(1) General. The financial management system and the participant data system of each recipient and...

  19. 41 CFR 109-27.102-50 - Systems contracting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102-50 Systems contracting. Systems contracting may... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Systems contracting. 109-27.102-50 Section 109-27.102-50 Public Contracts and Property Management Federal Property Management...

  20. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-27

    ... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...

  1. 40 CFR 35.6270 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 35.6270 Standards for financial management systems. (a) Accounting system standards—(1) General. The... of the adequacy of the financial management system as described in 40 CFR 31.20(c). (2) Allowable... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Standards for financial management...

  2. 7 CFR 277.6 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Standards for financial management systems. 277.6... ADMINISTRATIVE COSTS OF STATE AGENCIES § 277.6 Standards for financial management systems. (a) General. This section prescribes standards for financial management systems in administering program funds by the State...

  3. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Material Management and... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a...

  4. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (MAY 2011) (a) Definitions. As used in this...

  5. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (MAY 2011) (a) Definitions. As used in this...

  6. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Material Management and... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a...

  7. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (MAY 2011) (a) Definitions. As used in this...

  8. 48 CFR 252.242-7004 - Material Management and Accounting System.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Material Management and... CLAUSES Text of Provisions And Clauses 252.242-7004 Material Management and Accounting System. As prescribed in 242.7204, use the following clause: Material Management and Accounting System (MAY 2011) (a...

  9. 33 CFR 96.250 - What documents and reports must a safety management system have?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Safety management system document and data maintenance (1) Procedures which establish and maintain control of all documents and data relevant to the safety management system. (2) Documents are available at... safety management system have? 96.250 Section 96.250 Navigation and Navigable Waters COAST GUARD...

  10. 33 CFR 96.240 - What functional requirements must a safety management system meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a safety management system meet? 96.240 Section 96.240 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.240 What functional...

  11. 33 CFR 96.230 - What objectives must a safety management system meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management system meet? 96.230 Section 96.230 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY VESSEL OPERATING REGULATIONS RULES FOR THE SAFE OPERATION OF VESSELS AND SAFETY MANAGEMENT SYSTEMS Company and Vessel Safety Management Systems § 96.230 What objectives must a safety...

  12. 22 CFR 135.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Standards for financial management systems. 135... Financial Administration § 135.20 Standards for financial management systems. (a) A State must expand and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  13. 36 CFR 1207.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management systems. 1207.20 Section 1207.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS... financial management systems. (a) A State must expand and account for grant funds in accordance with State... management systems of other grantees and subgrantees must meet the following standards: (1) Financial...

  14. 32 CFR 33.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 1 2011-07-01 2011-07-01 false Standards for financial management systems. 33... financial management systems. (a) A State must expand and account for grant funds in accordance with State... management systems of other grantees and subgrantees must meet the following standards: (1) Financial...

  15. 21 CFR 1403.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Standards for financial management systems. 1403... Financial Administration § 1403.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  16. 38 CFR 43.20 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management systems. 43.20 Section 43.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... management systems. (a) A State must expand and account for grant funds in accordance with State laws and... violation of the restrictions and prohibitions of applicable statutes. (b) The financial management systems...

  17. 21 CFR 1403.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Standards for financial management systems. 1403... Financial Administration § 1403.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  18. 49 CFR 18.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 1 2014-10-01 2014-10-01 false Standards for financial management systems. 18.20... Administration § 18.20 Standards for financial management systems. (a) A State must expand and account for grant... statutes. (b) The financial management systems of other grantees and subgrantees must meet the following...

  19. 21 CFR 1403.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Standards for financial management systems. 1403... Financial Administration § 1403.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  20. 36 CFR § 1207.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management systems. § 1207.20 Section § 1207.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND... Standards for financial management systems. (a) A State must expand and account for grant funds in... financial management systems of other grantees and subgrantees must meet the following standards: (1...

  1. 38 CFR 43.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management systems. 43.20 Section 43.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... management systems. (a) A State must expand and account for grant funds in accordance with State laws and... violation of the restrictions and prohibitions of applicable statutes. (b) The financial management systems...

  2. 10 CFR 600.220 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Standards for financial management systems. 600.220... Post-Award Requirements § 600.220 Standards for financial management systems. (a) A State must expend... prohibitions of applicable statutes. (b) The financial management systems of other grantees and subgrantees...

  3. 45 CFR 1174.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Standards for financial management systems. 1174... Financial Administration § 1174.20 Standards for financial management systems. (a) A State must expand and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  4. 45 CFR 1183.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Standards for financial management systems. 1183... Financial Administration § 1183.20 Standards for financial management systems. (a) A State must expand and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  5. 45 CFR 1157.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Standards for financial management systems. 1157... Administration § 1157.20 Standards for financial management systems. (a) A State must expand and account for... statutes. (b) The financial management systems of other grantees and subgrantees must meet the following...

  6. 22 CFR 135.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Standards for financial management systems. 135... Financial Administration § 135.20 Standards for financial management systems. (a) A State must expand and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  7. 43 CFR 12.60 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Standards for financial management systems... Standards for financial management systems. (a) A State must expand and account for grant funds in... financial management systems of other grantees and subgrantees must meet the following standards: (1...

  8. 49 CFR 18.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Standards for financial management systems. 18.20... Administration § 18.20 Standards for financial management systems. (a) A State must expand and account for grant... statutes. (b) The financial management systems of other grantees and subgrantees must meet the following...

  9. 38 CFR 43.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management systems. 43.20 Section 43.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... management systems. (a) A State must expand and account for grant funds in accordance with State laws and... violation of the restrictions and prohibitions of applicable statutes. (b) The financial management systems...

  10. 45 CFR 1174.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Standards for financial management systems. 1174... Financial Administration § 1174.20 Standards for financial management systems. (a) A State must expand and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  11. 10 CFR 600.220 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Standards for financial management systems. 600.220... Post-Award Requirements § 600.220 Standards for financial management systems. (a) A State must expend... prohibitions of applicable statutes. (b) The financial management systems of other grantees and subgrantees...

  12. 48 CFR 52.204-13 - System for Award Management Maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management Maintenance. 52.204-13 Section 52.204-13 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.204-13 System for Award Management Maintenance. As prescribed in 4.1105(b), use the following clause: System for Award Management Maintenance (JUL 2013) (a) Definitions. As used in this clause...

  13. 38 CFR 43.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management systems. 43.20 Section 43.20 Pensions, Bonuses, and Veterans' Relief DEPARTMENT OF VETERANS... management systems. (a) A State must expand and account for grant funds in accordance with State laws and... violation of the restrictions and prohibitions of applicable statutes. (b) The financial management systems...

  14. 36 CFR 1207.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management systems. 1207.20 Section 1207.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS... financial management systems. (a) A State must expand and account for grant funds in accordance with State... management systems of other grantees and subgrantees must meet the following standards: (1) Financial...

  15. 36 CFR 1207.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management systems. 1207.20 Section 1207.20 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS... financial management systems. (a) A State must expand and account for grant funds in accordance with State... management systems of other grantees and subgrantees must meet the following standards: (1) Financial...

  16. 34 CFR 80.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Standards for financial management systems. 80.20... Financial Administration § 80.20 Standards for financial management systems. (a) A State must expand and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  17. 45 CFR 1157.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Standards for financial management systems. 1157... Administration § 1157.20 Standards for financial management systems. (a) A State must expand and account for... statutes. (b) The financial management systems of other grantees and subgrantees must meet the following...

  18. 7 CFR 3016.20 - Standards for financial management systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Standards for financial management systems. 3016.20... Standards for financial management systems. (a) A State must expand and account for grant funds in... financial management systems of other grantees and subgrantees must meet the following standards: (1...

  19. 10 CFR 600.220 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Standards for financial management systems. 600.220... Post-Award Requirements § 600.220 Standards for financial management systems. (a) A State must expend... prohibitions of applicable statutes. (b) The financial management systems of other grantees and subgrantees...

  20. 32 CFR 33.20 - Standards for financial management systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 1 2012-07-01 2012-07-01 false Standards for financial management systems. 33... financial management systems. (a) A State must expand and account for grant funds in accordance with State... management systems of other grantees and subgrantees must meet the following standards: (1) Financial...

  1. 21 CFR 1403.20 - Standards for financial management systems.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Standards for financial management systems. 1403... Financial Administration § 1403.20 Standards for financial management systems. (a) A State must expend and... of applicable statutes. (b) The financial management systems of other grantees and subgrantees must...

  2. 36 CFR 64.12 - Standards for grantee financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... financial management systems. 64.12 Section 64.12 Parks, Forests, and Public Property NATIONAL PARK SERVICE... RIGHTS-OF-WAY § 64.12 Standards for grantee financial management systems. The grantees' Financial Management Systems shall meet the minimum standards set forth in OMB Circular A-102, Attachment G. ...

  3. 7 CFR 277.6 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Standards for financial management systems. 277.6... ADMINISTRATIVE COSTS OF STATE AGENCIES § 277.6 Standards for financial management systems. (a) General. This section prescribes standards for financial management systems in administering program funds by the State...

  4. Space Transportation System Western Launch Site Construction Management Information System - A Case Study.

    DTIC Science & Technology

    1979-09-01

    The Corps of Engineers Management Information System (COEMIS) is used by the Corps of Engineers in their role as Construction Agents on Air Force...California. The research concluded that the Corps of Engineers Management Information System can be an effective, efficient management tool which has the

  5. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Earned Value Management... and Clauses 1852.234-2 Earned Value Management System. As prescribed in 1834.203-70(b) insert the following clause: Earned Value Management System (NOV 2006) (a) In the performance of this contract, the...

  6. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: EARNED VALUE MANAGEMENT SYSTEM (MAY 2011) (a) Definitions. As used in this...

  7. 48 CFR 252.234-7002 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Earned Value Management... of Provisions And Clauses 252.234-7002 Earned Value Management System. As prescribed in 234.203(2), use the following clause: Earned Value Management System (APR 2008) (a) In the performance of this...

  8. 48 CFR 1852.234-2 - Earned Value Management System.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Earned Value Management... and Clauses 1852.234-2 Earned Value Management System. As prescribed in 1834.203-70(b) insert the following clause: Earned Value Management System (NOV 2006) (a) In the performance of this contract, the...

  9. Management Information System Based on the Balanced Scorecard

    ERIC Educational Resources Information Center

    Kettunen, Juha; Kantola, Ismo

    2005-01-01

    Purpose: This study seeks to describe the planning and implementation in Finland of a campus-wide management information system using a rigorous planning methodology. Design/methodology/approach: The structure of the management information system is planned on the basis of the management process, where strategic management and the balanced…

  10. Identity and Access Management and Security in Higher Education.

    ERIC Educational Resources Information Center

    Bruhn, Mark; Gettes, Michael; West, Ann

    2003-01-01

    Discusses the drivers for an identity management system (IdM), components of this system, and its role within a school security strategy, focusing on: basic access management; requirements for access management; middleware support for an access management system; IdM implementation considerations (e.g., access eligibilities, authentication…

  11. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...

  12. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...

  13. 40 CFR 1.39 - Office of Policy, Planning and Evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Office of Management Systems and Evaluation, evaluating Agency management and uses of data for decision-making. (c) Office of Management Systems and Evaluation. The Office of Management Systems and... Administrator on Agency policy and planning issues and as such is responsible for supervision and management of...

  14. 41 CFR 101-30.403-2 - Management codes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....403-2 Section 101-30.403-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403-2 Management codes. For internal use within an...

  15. 41 CFR 101-30.403-2 - Management codes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....403-2 Section 101-30.403-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403-2 Management codes. For internal use within an...

  16. 41 CFR 101-30.403-2 - Management codes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....403-2 Section 101-30.403-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403-2 Management codes. For internal use within an...

  17. 41 CFR 101-30.403-2 - Management codes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....403-2 Section 101-30.403-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30.4-Use of the Federal Catalog System § 101-30.403-2 Management codes. For internal use within an...

  18. Utilization of Information Provided by the Wisconsin Management System.

    ERIC Educational Resources Information Center

    Rossmiller, Richard A.

    The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…

  19. Quality management, a directive approach to patient safety.

    PubMed

    Ayuso-Murillo, Diego; de Andrés-Gimeno, Begoña; Noriega-Matanza, Concha; López-Suárez, Rafael Jesús; Herrera-Peco, Ivan

    Nowadays the implementation of effective quality management systems and external evaluation in healthcare is a necessity to ensure not only transparency in activities related to health but also access to health and patient safety. The key to correctly implementing a quality management system is support from the managers of health facilities, since it is managers who design and communicate to health professionals the strategies of action involved in quality management systems. This article focuses on nursing managers' approach to quality management through the implementation of cycles of continuous improvement, participation of improvement groups, monitoring systems and external evaluation quality models (EFQM, ISO). The implementation of a quality management system will enable preventable adverse effects to be minimized or eliminated, and promote patient safety and safe practice by health professionals. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  20. Managing hybrid marketing systems.

    PubMed

    Moriarty, R T; Moran, U

    1990-01-01

    As competition increases and costs become critical, companies that once went to market only one way are adding new channels and using new methods - creating hybrid marketing systems. These hybrid marketing systems hold the promise of greater coverage and reduced costs. But they are also hard to manage; they inevitably raise questions of conflict and control: conflict because marketing units compete for customers; control because new indirect channels are less subject to management authority. Hard as they are to manage, however, hybrid marketing systems promise to become the dominant design, replacing the "purebred" channel strategy in all kinds of businesses. The trick to managing the hybrid is to analyze tasks and channels within and across a marketing system. A map - the hybrid grid - can help managers make sense of their hybrid system. What the chart reveals is that channels are not the basic building blocks of a marketing system; marketing tasks are. The hybrid grid forces managers to consider various combinations of channels and tasks that will optimize both cost and coverage. Managing conflict is also an important element of a successful hybrid system. Managers should first acknowledge the inevitability of conflict. Then they should move to bound it by creating guidelines that spell out which customers to serve through which methods. Finally, a marketing and sales productivity (MSP) system, consisting of a central marketing database, can act as the central nervous system of a hybrid marketing system, helping managers create customized channels and service for specific customer segments.

Top