Sample records for management system phase

  1. 78 FR 37676 - Federal Acquisition Regulation; System for Award Management Name Change, Phase 1 Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ....204-13 System for Award Management Maintenance. * * * * * System for Award Management Maintenance (Jul...; System for Award Management Name Change, Phase 1 Implementation AGENCY: Department of Defense (DoD... System for Award Management (SAM) database. DATES: Effective Date: July 22, 2013. FOR FURTHER INFORMATION...

  2. SLURM: Simple Linux Utility for Resource Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jette, M; Dunlap, C; Garlick, J

    2002-04-24

    Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, and scheduling modules. The design also includes a scalable, general-purpose communication infrastructure. Development will take place in four phases: Phase I results in a solid infrastructure; Phase II produces a functional but limited interactive job initiation capability without use of the interconnect/switch; Phase III provides switch support and documentation; Phase IV provides job status, fault-tolerance, and job queuing and control through Livermore's Distributed Productionmore » Control System (DPCS), a meta-batch and resource management system.« less

  3. A Data Management System for Multi-Phase Case-Control Studies

    PubMed Central

    Gibeau, Joanne M.; Steinfeldt, Lois C.; Stine, Mark J.; Tullis, Katherine V.; Lynch, H. Keith

    1983-01-01

    The design of a computerized system for the management of data in multi-phase epidemiologic case-control studies is described. Typical study phases include case-control selection, abstracting of data from medical records, and interview of study subjects or next of kin. In consultation with project personnel, requirements for the system were established: integration of data from all study phases into one data base, accurate follow-up of subjects through the study, sophisticated data editing capabilities, ready accessibility of specified programs to project personnel, and generation of current status and exception reports for project managment. SIR (Scientific Information Retrieval), a commercially available data base management system, was selected as the foundation of this system. The system forms a comprehensive data management system applicable to many types of public health research studies.

  4. Principal Experiences with Crisis Management Professional Development, Collaboration, and Implementation of the National Incident Management System Phases of Emergency Management

    ERIC Educational Resources Information Center

    Naradko, Anthony M.

    2017-01-01

    The purpose of this qualitative single-subject case study was to identify the elements critical to crisis management professional development for school principals; the factors influencing the implementation of the National Incident Management System Phases of Emergency Management (2010) for principals; and the necessary elements for fostering…

  5. Advanced Software Techniques for Data Management Systems. Volume 2: Space Shuttle Flight Executive System: Functional Design

    NASA Technical Reports Server (NTRS)

    Pepe, J. T.

    1972-01-01

    A functional design of software executive system for the space shuttle avionics computer is presented. Three primary functions of the executive are emphasized in the design: task management, I/O management, and configuration management. The executive system organization is based on the applications software and configuration requirements established during the Phase B definition of the Space Shuttle program. Although the primary features of the executive system architecture were derived from Phase B requirements, it was specified for implementation with the IBM 4 Pi EP aerospace computer and is expected to be incorporated into a breadboard data management computer system at NASA Manned Spacecraft Center's Information system division. The executive system was structured for internal operation on the IBM 4 Pi EP system with its external configuration and applications software assumed to the characteristic of the centralized quad-redundant avionics systems defined in Phase B.

  6. Designing a model for trauma system management using public health approach: the case of Iran.

    PubMed

    Tarighi, Payam; Tabibi, Seyed Jamaledin; Motevalian, Seyed Abbas; Tofighi, Shahram; Maleki, Mohammad Reza; Delgoshaei, Bahram; Panahi, Farzad; Masoomi, Gholam Reza

    2012-01-01

    Trauma is a leading cause of death and disability around the world. Injuries are responsible for about six million deaths annually, of which ninety percent occur in developing countries. In Iran, injuries are the most common cause of death among age groups below fifty. Trauma system development is a systematic and comprehensive approach to injury prevention and treatment whose effectiveness has been proved. The present study aims at designing a trauma system management model as the first step toward trauma system establishment in Iran. In this qualitative research, a conceptual framework was developed based on the public health approach and three well-known trauma system models. We used Benchmarks, Indicators and Scoring (BIS) to analyze the current situation of Iran trauma care system. Then the trauma system management was designed using the policy development phase of public health approach The trauma system management model, validated by a panel of experts, describes lead agency, trauma system plan, policy-making councils, and data-based control according to the four main functions of management: leading, planning, organizing and controlling. This model may be implemented in two phases: the exclusive phase, focusing on resource integration and the inclusive phase, which concentrates on system development. The model could facilitate the development of trauma system in Iran through pilot studies as the assurance phase of public health approach. Furthermore, the model can provide a practical framework for trauma system management at the international level.

  7. Management approach recommendations. Earth Observatory Satellite system definition study (EOS)

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.

  8. Cost effective management of space venture risks

    NASA Technical Reports Server (NTRS)

    Giuntini, Ronald E.; Storm, Richard E.

    1986-01-01

    The development of a model for the cost-effective management of space venture risks is discussed. The risk assessment and control program of insurance companies is examined. A simplified system development cycle which consists of a conceptual design phase, a preliminary design phase, a final design phase, a construction phase, and a system operations and maintenance phase is described. The model incorporates insurance safety risk methods and reliability engineering, and testing practices used in the development of large aerospace and defense systems.

  9. The Vocational Education Component of the Rhode Island Educational Management Information System.

    ERIC Educational Resources Information Center

    Galamaga, Donald P.; Bartolomeo, Paul A.

    The document describes the implementation (Phase Two) of the Vocational Educational module--one component of an educational management information system. Phase Two entails the technical effort of final system design, final output specifications, edit specifications, system software selection, computer programing, systems documentation and the…

  10. Migrating a lecture in nursing informatics to a blended learning format--A bottom-up approach to implement an open-source web-based learning management system.

    PubMed

    Schrader, Ulrich

    2006-01-01

    At the university of applied sciences in Germany a learning management system has been implemented. The migration of classic courses to a web-enhances curriculum can be categorized into three phases independent of the technology used. The first two phases "dedicated website" and "database supported content management system" are mainly concerned with bringing the learning material and current information online and making it available to the students. The goal is here to make the maintenance of the learning material easier. The third phase characterized by the use of a learning management system offers the support of more modern didactic principles like social constructionism or problem-oriented learning. In this papers the phases as they occurred with the migration of a course of nursing informatics are described and experiences discussed.. The absence of institutional goals associated with the use of a learning management system led to a bottom-up approach triggered by faculty activities that can be described by a promoter model rather than by a process management model. The use of an open source learning management systems made this process easier to realize since no financial commitment is required up front.

  11. Design of Training Systems Phase I Summary Report.

    ERIC Educational Resources Information Center

    Lindahl, William H.; And Others

    A summary is provided of the status of Phase I of the three-stage project, "Design of Training Systems" (DOTS). The purpose of the overall project is described as being to introduce the technologies of education, psychology, management and operations research into the management of Navy training. Phase I of the effort is designed to…

  12. TxDOT's pavement management information system : current status and future directions

    DOT National Transportation Integrated Search

    1997-12-01

    Phase 2 focuses on improving The Texas Pavement Management Information System (PMIS) implementation at the district level, the goal being to provide sufficient information to move from network to project level decision making. Phase 2 implementation ...

  13. An overview of the NASA electronic components information management system

    NASA Technical Reports Server (NTRS)

    Kramer, G.; Waterbury, S.

    1991-01-01

    The NASA Parts Project Office (NPPO) comprehensive data system to support all NASA Electric, Electronic, and Electromechanical (EEE) parts management and technical data requirements is described. A phase delivery approach is adopted, comprising four principal phases. Phases 1 and 2 support Space Station Freedom (SSF) and use a centralized architecture with all data and processing kept on a mainframe computer. Phases 3 and 4 support all NASA centers and projects and implement a distributed system architecture, in which data and processing are shared among networked database servers. The Phase 1 system, which became operational in February of 1990, implements a core set of functions. Phase 2, scheduled for release in 1991, adds functions to the Phase 1 system. Phase 3, to be prototyped beginning in 1991 and delivered in 1992, introduces a distributed system, separate from the Phase 1 and 2 system, with a refined semantic data model. Phase 4 extends the data model and functionality of the Phase 3 system to provide support for the NASA design community, including integration with Computer Aided Design (CAD) environments. Phase 4 is scheduled for prototyping in 1992 to 93 and delivery in 1994.

  14. Legacy systems: managing evolution through integration in a distributed and object-oriented computing environment.

    PubMed

    Lemaitre, D; Sauquet, D; Fofol, I; Tanguy, L; Jean, F C; Degoulet, P

    1995-01-01

    Legacy systems are crucial for organizations since they support key functionalities. But they become obsolete with aging and the apparition of new techniques. Managing their evolution is a key issue in software engineering. This paper presents a strategy that has been developed at Broussais University Hospital in Paris to make a legacy system devoted to the management of health care units evolve towards a new up-to-date software. A two-phase evolution pathway is described. The first phase consists in separating the interface from the data storage and application control and in using a communication channel between the individualized components. The second phase proposes to use an object-oriented DBMS in place of the homegrown system. An application example for the management of hypertensive patients is described.

  15. NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)

    EPA Science Inventory

    This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...

  16. Efficient modeling of phase jitter in dispersion-managed soliton systems.

    PubMed

    McKinstrie, C J; Xie, C; Lakoba, T I

    2002-11-01

    The variational method is used to derive correlation equations that model phase jitter in dispersion-managed soliton systems. The predictions of these correlation equations are consistent with numerical solutions of the nonlinear Schrödinger equation on which they are based.

  17. Microgravity fluid management requirements of advanced solar dynamic power systems

    NASA Technical Reports Server (NTRS)

    Migra, Robert P.

    1987-01-01

    The advanced solar dynamic system (ASDS) program is aimed at developing the technology for highly efficient, lightweight space power systems. The approach is to evaluate Stirling, Brayton and liquid metal Rankine power conversion systems (PCS) over the temperature range of 1025 to 1400K, identify the critical technologies and develop these technologies. Microgravity fluid management technology is required in several areas of this program, namely, thermal energy storage (TES), heat pipe applications and liquid metal, two phase flow Rankine systems. Utilization of the heat of fusion of phase change materials offers potential for smaller, lighter TES systems. The candidate TES materials exhibit large volume change with the phase change. The heat pipe is an energy dense heat transfer device. A high temperature application may transfer heat from the solar receiver to the PCS working fluid and/or TES. A low temperature application may transfer waste heat from the PCS to the radiator. The liquid metal Rankine PCS requires management of the boiling/condensing process typical of two phase flow systems.

  18. Systems Management of Air Force Standard Communications-Computer systems: There is a Better Way

    DTIC Science & Technology

    1988-04-01

    upgrade or replacement of systems. AFR 700-6, Information Systems Operation Management , AFR 700-7, Information Processing Center Opera- tions Management...and AFR 700-8, Telephone Systems Operation Management provide USAF guidance, policy and procedures governing this phase. 4 2. 800-Series Regulations

  19. Geographic information systems - transportation ISTEA management systems server net prototype pooled fund study : phase B - summary

    DOT National Transportation Integrated Search

    1997-06-01

    The Geographic Information System-Transportation (GIS-T) ISTEA Management Systems Server Net Prototype Pooled Fund Study represents the first national cooperative effort in the transportation industry to address the management and monitoring systems ...

  20. Legacy systems: managing evolution through integration in a distributed and object-oriented computing environment.

    PubMed Central

    Lemaitre, D.; Sauquet, D.; Fofol, I.; Tanguy, L.; Jean, F. C.; Degoulet, P.

    1995-01-01

    Legacy systems are crucial for organizations since they support key functionalities. But they become obsolete with aging and the apparition of new techniques. Managing their evolution is a key issue in software engineering. This paper presents a strategy that has been developed at Broussais University Hospital in Paris to make a legacy system devoted to the management of health care units evolve towards a new up-to-date software. A two-phase evolution pathway is described. The first phase consists in separating the interface from the data storage and application control and in using a communication channel between the individualized components. The second phase proposes to use an object-oriented DBMS in place of the homegrown system. An application example for the management of hypertensive patients is described. PMID:8563252

  1. Time management displays for shuttle countdown

    NASA Technical Reports Server (NTRS)

    Beller, Arthur E.; Hadaller, H. Greg; Ricci, Mark J.

    1992-01-01

    The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.

  2. Microgravity fluid management in two-phase thermal systems

    NASA Technical Reports Server (NTRS)

    Parish, Richard C.

    1987-01-01

    Initial studies have indicated that in comparison to an all liquid single phase system, a two-phase liquid/vapor thermal control system requires significantly lower pumping power, demonstrates more isothermal control characteristics, and allows greater operational flexibility in heat load placement. As a function of JSC's Work Package responsibility for thermal management of space station equipment external to the pressurized modules, prototype development programs were initiated on the Two-Phase Thermal Bus System (TBS) and the Space Erectable Radiator System (SERS). JSC currently has several programs underway to enhance the understanding of two-phase fluid flow characteristics. The objective of one of these programs (sponsored by the Microgravity Science and Applications Division at NASA-Headquarters) is to design, fabricate, and fly a two-phase flow regime mapping experiment in the Shuttle vehicle mid-deck. Another program, sponsored by OAST, involves the testing of a two-phase thermal transport loop aboard the KC-135 reduced gravity aircraft to identify system implications of pressure drop variation as a function of the flow quality and flow regime present in a representative thermal system.

  3. Identifying and Validating Requirements of a Mobile-Based Self-Management System for People Living with HIV.

    PubMed

    Mehraeen, Esmaeil; Safdari, Reza; Seyedalinaghi, Seyed Ahmad; Mohammadzadeh, Niloofar; Arji, Goli

    2018-01-01

    Due to the widespread use of mobile technology and the low cost of this technology, implementing a mobile-based self-management system can lead to adherence to the medication regimens and promotion of the health of people living with HIV (PLWH). We aimed to identify requirements of a mobile-based self-management system, and validate them from the perspective of infectious diseases specialists. This is a mixed-methods study that carried out in two main phases. In the first phase, we identified requirements of a mobile-based self-management system for PLWH. In the second phase, identified requirements were validated using a researcher made questionnaire. The statistical population was infectious diseases specialists affiliated to Tehran University of Medical Sciences. The collected data were analyzed using SPSS statistical software (version 19), and descriptive statistics. By full-text review of selected studies, we determined requirements of a mobile-based self-management system in four categories: demographic, clinical, strategically and technical capabilities. According to the findings, 6 data elements for demographic category, 11 data elements for clinical category, 10 items for self-management strategies, and 11 features for technical capabilities were selected. Using the identified preferences, it is possible to design and implement a mobile-based self-management system for HIV-positive people. Developing a mobile-based self-management system is expected to progress the skills of self-management PLWH, improve of medication regimen adherence, and facilitate communication with healthcare providers.

  4. Fluvial biogeomorphology in the Anthropocene: Managing rivers and managing landscapes.

    NASA Astrophysics Data System (ADS)

    Viles, Heather

    2015-04-01

    Biogeomorphology considers the many, and often complex, interactions between ecological and geomorphological processes. The concept of the Anthropocene deserves greater attention by scientists working on biogeomorphology, as will be demonstrated in this talk though a focus on fluvial environments. Rivers and river systems have been the subject of long-term human interference and management across the world, often in the form of direct manipulation of biogeomorphic interactions. Up to the present three broadly-defined phases of the Anthropocene can be identified - the Palaeoanthropocene, the Industrial Revolution and the Great Acceleration. Each of these broad phases of the Anthropocene has different implications for fluvial biogeomorphology and river management. The nature and dynamics of tufa-depositing systems provide good examples of the differing Anthropocene situations and will be focused on in this talk. We may now be entering a fourth phase of the Anthropocene called 'Earth system stewardship'. In terms of better understanding and managing the biogeomorphic interactions within rivers in such a phase, an improved conceptualisation of the Anthropocene and the complex web of interactions between human, ecological and geomorphological processes is needed.

  5. Integration, acceptance testing, and clinical operation of the Medical Information, Communication and Archive System, phase II.

    PubMed

    Smith, E M; Wandtke, J; Robinson, A

    1999-05-01

    The Medical Information, Communication and Archive System (MICAS) is a multivendor incremental approach to picture archiving and communications system (PACS). It is a multimodality integrated image management system that is seamlessly integrated with the radiology information system (RIS). Phase II enhancements of MICAS include a permanent archive, automated workflow, study caches, Microsoft (Redmond, WA) Windows NT diagnostic workstations with all components adhering to Digital Information Communications in Medicine (DICOM) standards. MICAS is designed as an enterprise-wide PACS to provide images and reports throughout the Strong Health healthcare network. Phase II includes the addition of a Cemax-Icon (Fremont, CA) archive, PACS broker (Mitra, Waterloo, Canada), an interface (IDX PACSlink, Burlington, VT) to the RIS (IDXrad) plus the conversion of the UNIX-based redundant array of inexpensive disks (RAID) 5 temporary archives in phase I to NT-based RAID 0 DICOM modality-specific study caches (ImageLabs, Bedford, MA). The phase I acquisition engines and workflow management software was uninstalled and the Cemax archive manager (AM) assumed these functions. The existing ImageLabs UNIX-based viewing software was enhanced and converted to an NT-based DICOM viewer. Installation of phase II hardware and software and integration with existing components began in July 1998. Phase II of MICAS demonstrates that a multivendor open-system incremental approach to PACS is feasible, cost-effective, and has significant advantages over a single-vendor implementation.

  6. [Practical implementation of a quality management system in a radiological department].

    PubMed

    Huber, S; Zech, C J

    2011-10-01

    This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards.

  7. Guide for the Management of Multinational Programs. A Handbook for Managers Entering the World of International Acquisition. Second Edition

    DTIC Science & Technology

    1987-05-11

    Labor Stability and Ccupensation Practices . . . . 4-9 Management Styles . . . . . . . . . . . . . . . . 4-12 Canadian Relationship to The US...Systýem (PAPS) Milestones and Phases ...... _ . . . 3-8 3-4 Phased Armaments Programminq System(PAPS)/ DoD Systems Acquisition Structural Relationship ...sharing o Armaments cooperation o An understanding of the relationship between economics and security. In concert with the above efforts were various allied

  8. Electric vehicles batteries thermal management systems employing phase change materials

    NASA Astrophysics Data System (ADS)

    Ianniciello, Lucia; Biwolé, Pascal Henry; Achard, Patrick

    2018-02-01

    Battery thermal management is necessary for electric vehicles (EVs), especially for Li-ion batteries, due to the heat dissipation effects on those batteries. Usually, air or coolant circuits are employed as thermal management systems in Li-ion batteries. However, those systems are expensive in terms of investment and operating costs. Phase change materials (PCMs) may represent an alternative which could be cheaper and easier to operate. In fact, PCMs can be used as passive or semi-passive systems, enabling the global system to sustain near-autonomous operations. This article presents the previous developments introducing PCMs for EVs battery cooling. Different systems are reviewed and solutions are proposed to enhance PCMs efficiency in those systems.

  9. Generic Health Management: A System Engineering Process Handbook Overview and Process

    NASA Technical Reports Server (NTRS)

    Wilson, Moses Lee; Spruill, Jim; Hong, Yin Paw

    1995-01-01

    Health Management, a System Engineering Process, is one of those processes-techniques-and-technologies used to define, design, analyze, build, verify, and operate a system from the viewpoint of preventing, or minimizing, the effects of failure or degradation. It supports all ground and flight elements during manufacturing, refurbishment, integration, and operation through combined use of hardware, software, and personnel. This document will integrate Health Management Processes (six phases) into five phases in such a manner that it is never a stand alone task/effort which separately defines independent work functions.

  10. Oil field management system

    DOEpatents

    Fincke, James R.

    2003-09-23

    Oil field management systems and methods for managing operation of one or more wells producing a high void fraction multiphase flow. The system includes a differential pressure flow meter which samples pressure readings at various points of interest throughout the system and uses pressure differentials derived from the pressure readings to determine gas and liquid phase mass flow rates of the high void fraction multiphase flow. One or both of the gas and liquid phase mass flow rates are then compared with predetermined criteria. In the event such mass flow rates satisfy the predetermined criteria, a well control system implements a correlating adjustment action respecting the multiphase flow. In this way, various parameters regarding the high void fraction multiphase flow are used as control inputs to the well control system and thus facilitate management of well operations.

  11. 48 CFR 242.7201 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management and Accounting System 242.7201 Definitions. Material management and accounting system and valid time-phased requirements are defined in the clause at 252.242-7004, Material Management and Accounting... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Definitions. 242.7201...

  12. The Training Information Management System. Volume 2. Phase 2 evaluation Report

    DTIC Science & Technology

    1986-07-01

    The Training Information Management System (TIMS) is a computer-based system which can be used by Army personnel to collect and display training...but resides at a fixed location (e.g., the unit headquarters). This research note documents an evaluation of the Training Information Management System .

  13. Congestion management system/IVHS program study Birmingham, Alabama : phase 1, report

    DOT National Transportation Integrated Search

    1995-04-01

    The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...

  14. Congestion Management System/IVHS Program Study for Birmingham, Alabama. Phase 1 Report

    DOT National Transportation Integrated Search

    1995-04-01

    The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...

  15. Knowledge-based system for flight information management. Thesis

    NASA Technical Reports Server (NTRS)

    Ricks, Wendell R.

    1990-01-01

    The use of knowledge-based system (KBS) architectures to manage information on the primary flight display (PFD) of commercial aircraft is described. The PFD information management strategy used tailored the information on the PFD to the tasks the pilot performed. The KBS design and implementation of the task-tailored PFD information management application is described. The knowledge acquisition and subsequent system design of a flight-phase-detection KBS is also described. The flight-phase output of this KBS was used as input to the task-tailored PFD information management KBS. The implementation and integration of this KBS with existing aircraft systems and the other KBS is described. The flight tests are examined of both KBS's, collectively called the Task-Tailored Flight Information Manager (TTFIM), which verified their implementation and integration, and validated the software engineering advantages of the KBS approach in an operational environment.

  16. Design of a Model Management Information System (MIS) for California's Regional Occupational Centers and Programs. Final Report.

    ERIC Educational Resources Information Center

    Dick, James C.; And Others

    The management information system (MIS) development project for California's Regional Occupational Centers and Programs (ROC/Ps) was conducted in 3 phases over a 12-month period. Phase I involved a literature review and field study to match MIS design features and development strategy with existing conditions in ROC/Ps. A decision support system…

  17. Development of a pavement management system for Virginia : final report on phase I : application and verification of a pilot pavement condition inventory for Virginia interstate flexible pavements.

    DOT National Transportation Integrated Search

    1984-01-01

    The study reported here addresses some of the earlier phases in the development of a pavement management system for the state of Virginia. Among the issues discussed are the development of an adequate data base and the implementation of a condition r...

  18. Model Transformation for a System of Systems Dependability Safety Case

    NASA Technical Reports Server (NTRS)

    Murphy, Judy; Driskell, Steve

    2011-01-01

    The presentation reviews the dependability and safety effort of NASA's Independent Verification and Validation Facility. Topics include: safety engineering process, applications to non-space environment, Phase I overview, process creation, sample SRM artifact, Phase I end result, Phase II model transformation, fault management, and applying Phase II to individual projects.

  19. Command Flight Path Display. Phase I and II. Appendix F.

    DTIC Science & Technology

    1983-09-01

    AD -R145 858 COMMAND FLIGHT PATH DISPLAY PHASE I AND 11 APPENDIX F / (U) SYSTEMS ASSOCIATES INC LONG BEACH CA RESOURCE MANAGEMENT SYSTEMS DIY SEP...34- (Appendix F) .ś. SYSTEMS ASSOCIATES INC* of CALIFORNIA t. Resource Management Systems Division DTICL it~~~ll ELECTE 1 o..-- , ~SEP 2 4 1984...Availability Codos Avail and/or Dist Special "i j L i 7 7 .... Contained in this appendix are the various plots generated dur- ing data reduction. Parameters

  20. Improved cost monitoring and control through the Earned Value Management System

    NASA Astrophysics Data System (ADS)

    Hunter, Howard; Fitzgerald, Richard; Barlow, Dewey

    2014-01-01

    As economic pressure and competition for budget among federal agencies has increased, there has been an increasing need for more granular data and robust management information systems. This is especially true for the execution of major civilian space programs. This need has resulted in new program management requirements being implemented in an attempt to limit cost and schedule growth. In particular, NASA Procedural Requirements (NPR) 7120.5D requires the implementation of an Earned Value Management System (EVMS) compliant with the requirements of American National Standards Institute (ANSI)/Electronic Industries Alliance Standard 748-B. The Radiation Belt Storm Probes (RBSP) program management team at The Johns Hopkins University Applied Physics Laboratory (JHU/APL) made a decision to implement an EVMS on RBSP during Phase B—a year earlier than specified in the contractual Phase C reporting requirement as defined in the NPR. This decision was made so that the project would have the benefit of 12 months of training and hands-on implementation during Phase B. Although there were a number of technical and process hurdles encountered during Phase B and into Phase C, the system was working well when the Integrated Baseline Review (IBR) was held in August 2009. The IBR was a success because it met the review requirements. It was also clear to all IBR participants that the EVMS was providing value to the project management team. Although the IBR pointed out some areas of concern regarding process and ANSI compliance, the system had markedly improved the project's ability to monitor cost and schedule. This, in turn, allowed the project team to foresee problems in advance, formulate corrective actions, and implement course corrections without causing significant adverse impact to the project. Opponents of EVMS systems often communicate the unfavorable opinion that EVMS systems create unnecessary cost and administration. Although it is undeniable that EVMS implementation does not occur without cost, the cost is minimal in comparison to the benefits of successful implementation. This paper will focus on the implementation of EVMS on the RBSP project, explain EV processes and the implementation's cost, and analyze the benefits of EVMS to provide insight into cost/benefit considerations for other projects considering EVMS implementation. This paper will do this by focusing on the following points: (1) RBSP is the first full-up implementation of earned value management (EVM) at JHU/APL; (2) RBSP EVM started in Phase B; (3) RBSP EVM implementation has been working well in Phase C/D; (4) RBSP EVM implementation has been recognized by Goddard Space Flight Center and NASA Headquarters as successful; and (5) an assessment of the benefits of EVMS to the project management team and sponsor shows that the system's benefits outweigh the cost of implementation.

  1. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM2.5) RESEARCH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Charles G. Crawford

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase 1, which is currently in progress and will take twelve months to complete, will include the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. In Phase 2, which will be completed in the second year of the project, a platform for on-line data analysis will be developed. Phase 2 will include the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its eleventh month of Phase 1 development activities.« less

  2. Change and Transition--The Basis of the Effective Quality Management System = Kaita ir Keitimasis--Efektyvios Kokybes Vadybos Sistemos Pagrindas

    ERIC Educational Resources Information Center

    Misiunas, Mindaugas; Stravinskiene, Inga

    2010-01-01

    The article reasons the aspect of change and transition in higher education institutions implementing quality management systems. Psychological and behavioural responses of high school staff towards quality management system being implemented are discussed; transition phases of the employees are introduced; specific features of staff management in…

  3. Defence Capability Plan 2006-2016

    DTIC Science & Technology

    2006-06-14

    and supply chain management ; and • developing strategies focussing on critical industry capabilities and Defence’s ability to manage supply and... managers undertake pre-approval study activity and prepare the necessary departmental documentation. More formal industry solicitation would continue...Defence Management Systems Improvement Less than $10m JP 2085 Phase 1B Explosive Ordnance Warstock $150m to $200m JP 2090 Phase 1B Combined Information

  4. A support architecture for reliable distributed computing systems

    NASA Technical Reports Server (NTRS)

    Mckendry, Martin S.

    1986-01-01

    The Clouds kernel design was through several design phases and is nearly complete. The object manager, the process manager, the storage manager, the communications manager, and the actions manager are examined.

  5. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson Khosah

    2007-07-31

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project was conducted in two phases. Phase One included the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two involved the development of a platform for on-line data analysis. Phase Two included the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now technically completed.« less

  6. Advanced software techniques for data management systems. Volume 1: Study of software aspects of the phase B space shuttle avionics system

    NASA Technical Reports Server (NTRS)

    Martin, F. H.

    1972-01-01

    An overview of the executive system design task is presented. The flight software executive system, software verification, phase B baseline avionics system review, higher order languages and compilers, and computer hardware features are also discussed.

  7. The Wide-area Energy Management System Phase 2 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resultingmore » system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.« less

  8. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  9. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  10. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  11. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  12. 41 CFR 101-30.703 - Program objectives.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30... the Federal catalog system data base; and (e) Phasing out of the Government supply system those items... management, and warehousing costs; then following through to eliminate the items from agency catalog systems...

  13. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  14. Decision-making process related to treatment and management in Korean women with breast cancer: Finding the right individualized healthcare trajectory.

    PubMed

    Kim, Kkotbong; Yang, Jinhyang

    2017-06-01

    After being diagnosed with breast cancer, women must make a number of decisions about their treatment and management. When the decision-making process among breast cancer patients is ineffective, it results in harm to their health. Little is known about the decision-making process of breast cancer patients during the entire course of treatment and management. We investigated women with breast cancer to explore the decision-making processes related to treatment and management. Eleven women participated, all of whom were receiving treatment or management in Korea. The average participant age was 43.5years. For data collection and analysis, a grounded theory methodology was used. Through constant comparative analyses, a core category emerged that we referred to as "finding the right individualized healthcare trajectory." The decision-making process occurred in four phases: turmoil, exploration, balance, and control. The turmoil phase included weighing the credibility of information and lowering the anxiety level. The exploration phase included assessing the expertise/promptness of medical treatment and evaluating the effectiveness of follow-up management. The balance phase included performing analyses from multiple angles and rediscovering value as a human being. The control phase included constructing an individualized management system and following prescribed and other management options. It is important to provide patients with accurate information related to the treatment and management of breast cancer so that they can make effective decisions. Healthcare providers should engage with patients on issues related to their disease, understand the burden placed on patients because of issues related to their sex, and ensure that the patient has a sufficient support system. The results of this study can be used to develop phase-specific, patient-centered, and tailored interventions for breast cancer patients. Copyright © 2017 Elsevier Inc. All rights reserved.

  15. Michigan Department of Transportation statewide advanced traffic management system (ATMS) procurement evaluation - phase I : software procurement.

    DOT National Transportation Integrated Search

    2009-04-01

    This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...

  16. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 4 : use of knowledge integrated visual analytics system in supporting bridge management.

    DOT National Transportation Integrated Search

    2009-12-01

    The goals of integration should be: Supporting domain oriented data analysis through the use of : knowledge augmented visual analytics system. In this project, we focus on: : Providing interactive data exploration for bridge managements. : ...

  17. Engineering the Business of Defense Acquisition: An Analysis of Program Office Processes

    DTIC Science & Technology

    2015-05-01

    Information Technology and Business Process Redesign | MIT Sloan Management Review . MIT Sloan Management Review . Retrieved from http://sloanreview.mit.edu...links systems management to process execution Three Phases/ Multi-Year Effort (This Phase) Literature review Model development— Formal and...estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining

  18. Increasing Complexity in Rule-Based Clinical Decision Support: The Symptom Assessment and Management Intervention.

    PubMed

    Lobach, David F; Johns, Ellis B; Halpenny, Barbara; Saunders, Toni-Ann; Brzozowski, Jane; Del Fiol, Guilherme; Berry, Donna L; Braun, Ilana M; Finn, Kathleen; Wolfe, Joanne; Abrahm, Janet L; Cooley, Mary E

    2016-11-08

    Management of uncontrolled symptoms is an important component of quality cancer care. Clinical guidelines are available for optimal symptom management, but are not often integrated into the front lines of care. The use of clinical decision support (CDS) at the point-of-care is an innovative way to incorporate guideline-based symptom management into routine cancer care. The objective of this study was to develop and evaluate a rule-based CDS system to enable management of multiple symptoms in lung cancer patients at the point-of-care. This study was conducted in three phases involving a formative evaluation, a system evaluation, and a contextual evaluation of clinical use. In Phase 1, we conducted iterative usability testing of user interface prototypes with patients and health care providers (HCPs) in two thoracic oncology clinics. In Phase 2, we programmed complex algorithms derived from clinical practice guidelines into a rules engine that used Web services to communicate with the end-user application. Unit testing of algorithms was conducted using a stack-traversal tree-spanning methodology to identify all possible permutations of pathways through each algorithm, to validate accuracy. In Phase 3, we evaluated clinical use of the system among patients and HCPs in the two clinics via observations, structured interviews, and questionnaires. In Phase 1, 13 patients and 5 HCPs engaged in two rounds of formative testing, and suggested improvements leading to revisions until overall usability scores met a priori benchmarks. In Phase 2, symptom management algorithms contained between 29 and 1425 decision nodes, resulting in 19 to 3194 unique pathways per algorithm. Unit testing required 240 person-hours, and integration testing required 40 person-hours. In Phase 3, both patients and HCPs found the system usable and acceptable, and offered suggestions for improvements. A rule-based CDS system for complex symptom management was systematically developed and tested. The complexity of the algorithms required extensive development and innovative testing. The Web service-based approach allowed remote access to CDS knowledge, and could enable scaling and sharing of this knowledge to accelerate availability, and reduce duplication of effort. Patients and HCPs found the system to be usable and useful. ©David F Lobach, Ellis B Johns, Barbara Halpenny, Toni-Ann Saunders, Jane Brzozowski, Guilherme Del Fiol, Donna L Berry, Ilana M Braun, Kathleen Finn, Joanne Wolfe, Janet L Abrahm, Mary E Cooley. Originally published in JMIR Medical Informatics (http://medinform.jmir.org), 08.11.2016.

  19. Value added data archiving

    NASA Technical Reports Server (NTRS)

    Berard, Peter R.

    1993-01-01

    Researchers in the Molecular Sciences Research Center (MSRC) of Pacific Northwest Laboratory (PNL) currently generate massive amounts of scientific data. The amount of data that will need to be managed by the turn of the century is expected to increase significantly. Automated tools that support the management, maintenance, and sharing of this data are minimal. Researchers typically manage their own data by physically moving datasets to and from long term storage devices and recording a dataset's historical information in a laboratory notebook. Even though it is not the most efficient use of resources, researchers have tolerated the process. The solution to this problem will evolve over the next three years in three phases. PNL plans to add sophistication to existing multilevel file system (MLFS) software by integrating it with an object database management system (ODBMS). The first phase in the evolution is currently underway. A prototype system of limited scale is being used to gather information that will feed into the next two phases. This paper describes the prototype system, identifies the successes and problems/complications experienced to date, and outlines PNL's long term goals and objectives in providing a permanent solution.

  20. Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia

    NASA Astrophysics Data System (ADS)

    Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena

    2015-06-01

    In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.

  1. Electronic construction collaboration system : phase III.

    DOT National Transportation Integrated Search

    2011-12-01

    This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Br...

  2. Autonomous Satellite Command and Control through the World Wide Web: Phase 3

    NASA Technical Reports Server (NTRS)

    Cantwell, Brian; Twiggs, Robert

    1998-01-01

    NASA's New Millenium Program (NMP) has identified a variety of revolutionary technologies that will support orders of magnitude improvements in the capabilities of spacecraft missions. This program's Autonomy team has focused on science and engineering automation technologies. In doing so, it has established a clear development roadmap specifying the experiments and demonstrations required to mature these technologies. The primary developmental thrusts of this roadmap are in the areas of remote agents, PI/operator interface, planning/scheduling fault management, and smart execution architectures. Phases 1 and 2 of the ASSET Project (previously known as the WebSat project) have focused on establishing World Wide Web-based commanding and telemetry services as an advanced means of interfacing a spacecraft system with the PI and operators. Current automated capabilities include Web-based command submission, limited contact scheduling, command list generation and transfer to the ground station, spacecraft support for demonstrations experiments, data transfer from the ground station back to the ASSET system, data archiving, and Web-based telemetry distribution. Phase 2 was finished in December 1996. During January-December 1997 work was commenced on Phase 3 of the ASSET Project. Phase 3 is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer; (2) Support prioritized handling of multiple PIs as well as associated payload experimenters; (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft; (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware; (5) Implement a beacon monitoring test; (6) Implement an experimental blackboard controller for space system management; (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals is examined in the next section. Significant sections of this report were also published as a conference paper.

  3. Evaluation criteria for district health management information systems: lessons from the Ministry of Health, Kenya.

    PubMed

    Odhiambo-Otieno, George W

    2005-01-01

    There has been no comprehensive evaluation of the district health management information systems (DHMISs) since the establishment of these systems by the Ministry of Health (MoH), in Kenya. This is partly due to lack of defined criteria for evaluating the systems. The objective of this study is to design evaluation criteria for assessing the viability, sustainability and ultimate contribution of DHMIS in the management of the district health system (DHS) in Kenya. This descriptive cross-sectional study was undertaken in three DHSs in Kenya. Empirical evidence was collected through interviews, complemented by a comprehensive review of relevant literature, reports and operational manuals of various health information systems in Kenya. A set of evaluation criteria for DHMISs in Kenya was designed for each of the three phases of implementation: phase one-pre-implementation evaluation criteria (categorized as policy and objectives, technical feasibility, financial viability, political viability and administrative operability) to be applied at the design stage; phase two-concurrent (operational) implementation evaluation criteria to be applied during implementation of the new system; phase three-post-implementation evaluation criteria (classified as internal-quality of information; external-resources and managerial support; ultimate-systems impact) to be applied after operating the implemented system for at least 3 years. In designing a DHMIS model there is need to have built-in these three sets of evaluation criteria which should be used in a phased manner. Pre-implementation evaluation criteria should be used to evaluate the system's viability before more resources are committed to its implementation; concurrent (operational) implementation evaluation criteria should be used to ascertain the status of the on-going implementation with the view to either fine-tune or abandon it altogether before more resources are used on it; and post-implementation evaluation criteria should be used to assess its overall effectiveness (if it has achieved its hypothesized benefits) towards the management of DHS.

  4. Power management and distribution system for a More-Electric Aircraft (MADMEL) -- Program status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maldonado, M.A.; Shah, N.M.; Cleek, K.J.

    1995-12-31

    A number of technology breakthroughs in recent years have rekindled the concept of a more-electric aircraft. High-power solid-state switching devices, electrohydrostatic actuators (EHAs), electromechanical actuators (EMAs), and high-power generators are just a few examples of component developments that have made dramatic improvements in properties such as weight, size, power, and cost. However, these components cannot be applied piecemeal. A complete, and somewhat revolutionary, system design approach is needed to exploit the benefits that a more-electric aircraft can provide. A five-phase Power Management and Distribution System for a More-Electric Aircraft (MADMEL) program was awarded by the Air Force to the Northrop/Grumman,more » Military Aircraft Division team in September 1991. The objective of the program is to design, develop, and demonstrate an advanced electrical power generation and distribution system for a more-electric aircraft (MEA). The MEA emphasizes the use of electrical power in place of hydraulics, pneumatic, and mechanical power to optimize the performance and life cycle cost of the aircraft. This paper presents an overview of the MADMEL program and a top-level summary of the program results, development and testing of major components to date. In Phase 1 and Phase 2 studies, the electrical load requirements were established and the electrical power system architecture was defined for both near-term (NT-year 1996) and far-term (FT-year 2003) MEA application. The detailed design and specification for the electrical power system (EPS), its interface with the Vehicle Management System, and the test set-up were developed under the recently completed Phase 3. The subsystem level hardware fabrication and testing will be performed under the on-going Phase 4 activities. The overall system level integration and testing will be performed in Phase 5.« less

  5. Instructional System Design for Executive Orientation and Project Management Training Packages, Technical Memorandum No. 3. Interim Report. RF Project No. 3131-A1.

    ERIC Educational Resources Information Center

    Cook, Desmond L.; And Others

    This memorandum reports on the third phase, the design, of a four-phase project to design project management training materials for local educational agencies. The first section of the memorandum explains some considerations regarding management education and the organization of the report. Section 2 presents the design specifications for the…

  6. Agile parallel bioinformatics workflow management using Pwrake.

    PubMed

    Mishima, Hiroyuki; Sasaki, Kensaku; Tanaka, Masahiro; Tatebe, Osamu; Yoshiura, Koh-Ichiro

    2011-09-08

    In bioinformatics projects, scientific workflow systems are widely used to manage computational procedures. Full-featured workflow systems have been proposed to fulfil the demand for workflow management. However, such systems tend to be over-weighted for actual bioinformatics practices. We realize that quick deployment of cutting-edge software implementing advanced algorithms and data formats, and continuous adaptation to changes in computational resources and the environment are often prioritized in scientific workflow management. These features have a greater affinity with the agile software development method through iterative development phases after trial and error.Here, we show the application of a scientific workflow system Pwrake to bioinformatics workflows. Pwrake is a parallel workflow extension of Ruby's standard build tool Rake, the flexibility of which has been demonstrated in the astronomy domain. Therefore, we hypothesize that Pwrake also has advantages in actual bioinformatics workflows. We implemented the Pwrake workflows to process next generation sequencing data using the Genomic Analysis Toolkit (GATK) and Dindel. GATK and Dindel workflows are typical examples of sequential and parallel workflows, respectively. We found that in practice, actual scientific workflow development iterates over two phases, the workflow definition phase and the parameter adjustment phase. We introduced separate workflow definitions to help focus on each of the two developmental phases, as well as helper methods to simplify the descriptions. This approach increased iterative development efficiency. Moreover, we implemented combined workflows to demonstrate modularity of the GATK and Dindel workflows. Pwrake enables agile management of scientific workflows in the bioinformatics domain. The internal domain specific language design built on Ruby gives the flexibility of rakefiles for writing scientific workflows. Furthermore, readability and maintainability of rakefiles may facilitate sharing workflows among the scientific community. Workflows for GATK and Dindel are available at http://github.com/misshie/Workflows.

  7. Agile parallel bioinformatics workflow management using Pwrake

    PubMed Central

    2011-01-01

    Background In bioinformatics projects, scientific workflow systems are widely used to manage computational procedures. Full-featured workflow systems have been proposed to fulfil the demand for workflow management. However, such systems tend to be over-weighted for actual bioinformatics practices. We realize that quick deployment of cutting-edge software implementing advanced algorithms and data formats, and continuous adaptation to changes in computational resources and the environment are often prioritized in scientific workflow management. These features have a greater affinity with the agile software development method through iterative development phases after trial and error. Here, we show the application of a scientific workflow system Pwrake to bioinformatics workflows. Pwrake is a parallel workflow extension of Ruby's standard build tool Rake, the flexibility of which has been demonstrated in the astronomy domain. Therefore, we hypothesize that Pwrake also has advantages in actual bioinformatics workflows. Findings We implemented the Pwrake workflows to process next generation sequencing data using the Genomic Analysis Toolkit (GATK) and Dindel. GATK and Dindel workflows are typical examples of sequential and parallel workflows, respectively. We found that in practice, actual scientific workflow development iterates over two phases, the workflow definition phase and the parameter adjustment phase. We introduced separate workflow definitions to help focus on each of the two developmental phases, as well as helper methods to simplify the descriptions. This approach increased iterative development efficiency. Moreover, we implemented combined workflows to demonstrate modularity of the GATK and Dindel workflows. Conclusions Pwrake enables agile management of scientific workflows in the bioinformatics domain. The internal domain specific language design built on Ruby gives the flexibility of rakefiles for writing scientific workflows. Furthermore, readability and maintainability of rakefiles may facilitate sharing workflows among the scientific community. Workflows for GATK and Dindel are available at http://github.com/misshie/Workflows. PMID:21899774

  8. The fault monitoring and diagnosis knowledge-based system for space power systems: AMPERES, phase 1

    NASA Technical Reports Server (NTRS)

    Lee, S. C.

    1989-01-01

    The objective is to develop a real time fault monitoring and diagnosis knowledge-based system (KBS) for space power systems which can save costly operational manpower and can achieve more reliable space power system operation. The proposed KBS was developed using the Autonomously Managed Power System (AMPS) test facility currently installed at NASA Marshall Space Flight Center (MSFC), but the basic approach taken for this project could be applicable for other space power systems. The proposed KBS is entitled Autonomously Managed Power-System Extendible Real-time Expert System (AMPERES). In Phase 1 the emphasis was put on the design of the overall KBS, the identification of the basic research required, the initial performance of the research, and the development of a prototype KBS. In Phase 2, emphasis is put on the completion of the research initiated in Phase 1, and the enhancement of the prototype KBS developed in Phase 1. This enhancement is intended to achieve a working real time KBS incorporated with the NASA space power system test facilities. Three major research areas were identified and progress was made in each area. These areas are real time data acquisition and its supporting data structure; sensor value validations; development of inference scheme for effective fault monitoring and diagnosis, and its supporting knowledge representation scheme.

  9. Analysis of a display and control system man-machine interface concept. Volume 1: Final technical report

    NASA Technical Reports Server (NTRS)

    Karl, D. R.

    1972-01-01

    An evaluation was made of the feasibility of utilizing a simplified man machine interface concept to manage and control a complex space system involving multiple redundant computers that control multiple redundant subsystems. The concept involves the use of a CRT for display and a simple keyboard for control, with a tree-type control logic for accessing and controlling mission, systems, and subsystem elements. The concept was evaluated in terms of the Phase B space shuttle orbiter, to utilize the wide scope of data management and subsystem control inherent in the central data management subsystem provided by the Phase B design philosophy. Results of these investigations are reported in four volumes.

  10. Waste Management Information System (WMIS) User Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. E. Broz

    2008-12-22

    This document provides the user of the Waste Management Information System (WMIS) instructions on how to use the WMIS software. WMIS allows users to initiate, track, and close waste packages. The modular design supports integration and utilization of data throuh the various stages of waste management. The phases of the waste management work process include generation, designation, packaging, container management, procurement, storage, treatment, transportation, and disposal.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gelfand, Ilya; Shcherbak, Iurii; Millar, Neville

    Differences in soil nitrous oxide (N 2O) fluxes among ecosystems are often difficult to evaluate and predict due to high spatial and temporal variabilities and few direct experimental comparisons. For 20 years, we measured N 2O fluxes in 11 ecosystems in southwest Michigan USA: four annual grain crops (corn–soybean–wheat rotations) managed with conventional, no-till, reduced input, or biologically based/organic inputs; three perennial crops (alfalfa, poplar, and conifers); and four unmanaged ecosystems of different successional age including mature forest. Average N 2O emissions were higher from annual grain and N-fixing cropping systems than from nonleguminous perennial cropping systems and were low across unmanaged ecosystems. Among annual cropping systems full-rotation fluxes were indistinguishable from one another but rotation phase mattered. For example, those systems with cover crops and reduced fertilizer N emitted more N 2O during the corn and soybean phases, but during the wheat phase fluxes were ~40% lower. Likewise, no-till did not differ from conventional tillage over the entire rotation but reduced emissions ~20% in the wheat phase and increased emissions 30–80% in the corn and soybean phases. Greenhouse gas intensity for the annual crops (flux per unit yield) was lowest for soybeans produced under conventional management, while for the 11 other crop 9 management combinations intensities were similar to one another. Among the fertilized systems, emissions ranged from 0.30 to 1.33 kg N 2O-N ha -1 yr -1 and were best predicted by IPCC Tier 1 and DEF emission factor approaches. Annual cumulative fluxes from perennial systems were best explained by soil NOmore » $$-\\atop{3}$$ pools (r 2 = 0.72) but not so for annual crops, where management differences overrode simple correlations. Daily soil N 2O emissions were poorly predicted by any measured variables. Overall, long-term measurements reveal lower fluxes in nonlegume perennial vegetation and, for conservatively fertilized annual crops, the overriding influence of rotation phase on annual fluxes.« less

  12. FRACTAL Systems & Project suite: engineering tools for improving development and operation of the systems

    NASA Astrophysics Data System (ADS)

    Pérez-Calpena, A.; Mujica-Alvarez, E.; Osinde-Lopez, J.; García-Vargas, M.

    2008-07-01

    This paper describes the FRACTAL Systems & Projects suite. This suite is composed by several tools (GECO, DOCMA and SUMO) that provide the capabilities that all organizations need to store and manage the system information generated along the project's lifetime, from the design phase to the operation phase. The amount of information that is generated in a project keeps growing in size and complexity along the project's lifetime, to an extent that it becomes impossible to manage it without the aid of specific computer-based tools. The suite described in this paper is the solution developed by FRACTAL to assist the execution of different scientific projects, mainly related with telescopes and instruments, for astronomical research centres. These tools help the system and project engineers to maintain the technical control of the systems and to ensure an optimal use of the resources. GECO eases the control of the system configuration data; DOCMA provides the means to organise and manage the documents generated in the project; SUMO allows managing and scheduling the operation, the maintenance activities and the resources during the operational phase of a system. These tools improve the project communication making the information available to the authorized users (project team, customers, Consortium's members, etc). Finally and depending on the project needs, these three tools can be used integrated or in an independent manner.

  13. Evaluation of Job Queuing/Scheduling Software: Phase I Report

    NASA Technical Reports Server (NTRS)

    Jones, James Patton

    1996-01-01

    The recent proliferation of high performance work stations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, the national Aerodynamic Simulation (NAS) supercomputer facility compiled a requirements checklist for job queuing/scheduling software. Next, NAS began an evaluation of the leading job management system (JMS) software packages against the checklist. This report describes the three-phase evaluation process, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still insufficient, even in the leading JMS's. However, by ranking each JMS evaluated against the requirements, we provide data that will be useful to other sites in selecting a JMS.

  14. The use of LCA in selecting the best MSW management system.

    PubMed

    De Feo, Giovanni; Malvano, Carmela

    2009-06-01

    This paper focuses on the study of eleven environmental impact categories produced by several municipal solid waste management systems (scenarios) operating on a provincial scale in Southern Italy. In particular, the analysis takes into account 12 management scenarios with 16 management phases for each one. The only difference among ten of the scenarios (separated kerbside collection of all recyclables, glass excepted, composting of putrescibles, RDF pressed bales production and incineration, final landfilling) is the percentage of separated collection varying in the range of 35-80%, while the other two scenarios, for 80% of separate collection, consider different alternatives in the disposal of treatment residues (dry residue sorting and final landfilling or direct disposal in landfill). The potential impacts induced on the environmental components were analysed using the life cycle assessment (LCA) procedure called "WISARD" (Waste Integrated System Assessment for Recovery and Disposal). Paper recycling was the phase with the greatest influence on avoided impacts, while the collection logistics of dry residue was the phase with the greatest influence on produced impacts. For six impact categories (renewable and total energy use, water, suspended solids and oxydable matters index, eutrophication and hazardous waste production), for high percentages of separate collection a management system based on recovery and recycling but without incineration would be preferable.

  15. Integrated corridor management initiative : demonstration phase evaluation, San Diego traveler response analysis test plan.

    DOT National Transportation Integrated Search

    1995-10-01

    REAL-TIME TRAFFIC INFORMATION, ROUTE GUIDANCE, ROUTE PLANNING, INTELLIGENT VEHICLE INITIATIVE OR IVI ">">KEYWORDS: OPERATIONAL TESTS, TRAVTEK, ADVANCED TRAVELER INFORMATION SYSTEMS OR ATIS, ADVANCED TRAFFIC MANAGEMENT SYSTEMS OR ATMS, INTELLI...

  16. Database and Analytical Tool Development for the Management of Data Derived from US DOE (NETL) Funded Fine Particulate (PM2.5) Research

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Frank T. Alex

    2007-02-11

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-eighth month of development activities.« less

  17. DATABASE AND ANALYTICAL TOOL DEVELOPMENT FOR THE MANAGEMENT OF DATA DERIVED FROM US DOE (NETL) FUNDED FINE PARTICULATE (PM 2.5) RESEARCH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson P. Khosah; Charles G. Crawford

    2006-02-11

    Advanced Technology Systems, Inc. (ATS) was contracted by the U. S. Department of Energy's National Energy Technology Laboratory (DOE-NETL) to develop a state-of-the-art, scalable and robust web-accessible database application to manage the extensive data sets resulting from the DOE-NETL-sponsored ambient air monitoring programs in the upper Ohio River valley region. The data management system was designed to include a web-based user interface that will allow easy access to the data by the scientific community, policy- and decision-makers, and other interested stakeholders, while providing detailed information on sampling, analytical and quality control parameters. In addition, the system will provide graphical analyticalmore » tools for displaying, analyzing and interpreting the air quality data. The system will also provide multiple report generation capabilities and easy-to-understand visualization formats that can be utilized by the media and public outreach/educational institutions. The project is being conducted in two phases. Phase One includes the following tasks: (1) data inventory/benchmarking, including the establishment of an external stakeholder group; (2) development of a data management system; (3) population of the database; (4) development of a web-based data retrieval system, and (5) establishment of an internal quality assurance/quality control system on data management. Phase Two, which is currently underway, involves the development of a platform for on-line data analysis. Phase Two includes the following tasks: (1) development of a sponsor and stakeholder/user website with extensive online analytical tools; (2) development of a public website; (3) incorporation of an extensive online help system into each website; and (4) incorporation of a graphical representation (mapping) system into each website. The project is now into its forty-second month of development activities.« less

  18. Large shipyard enlists EMS control capabilities. [Energy management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-10-01

    The energy management plan of the Ingalls Shipbuilding in Pascagoula, Mississippi, featuring computer technology, is described. An integral component of the plan is a plus 300-point energy management system with Phase II expansion envisaging to bring additional points under control Within the first ten months of operation, the system saved more than /89,763 in electricity costs alone.

  19. Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

    NASA Technical Reports Server (NTRS)

    Jung, Yoon; Engelland, Shawn; Capps, Richard; Coppenbarger, Rich; Hooey, Becky; Sharma, Shivanjli; Stevens, Lindsay; Verma, Savita; Lohr, Gary; Chevalley, Eric; hide

    2018-01-01

    This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

  20. Space station advanced automation

    NASA Technical Reports Server (NTRS)

    Woods, Donald

    1990-01-01

    In the development of a safe, productive and maintainable space station, Automation and Robotics (A and R) has been identified as an enabling technology which will allow efficient operation at a reasonable cost. The Space Station Freedom's (SSF) systems are very complex, and interdependent. The usage of Advanced Automation (AA) will help restructure, and integrate system status so that station and ground personnel can operate more efficiently. To use AA technology for the augmentation of system management functions requires a development model which consists of well defined phases of: evaluation, development, integration, and maintenance. The evaluation phase will consider system management functions against traditional solutions, implementation techniques and requirements; the end result of this phase should be a well developed concept along with a feasibility analysis. In the development phase the AA system will be developed in accordance with a traditional Life Cycle Model (LCM) modified for Knowledge Based System (KBS) applications. A way by which both knowledge bases and reasoning techniques can be reused to control costs is explained. During the integration phase the KBS software must be integrated with conventional software, and verified and validated. The Verification and Validation (V and V) techniques applicable to these KBS are based on the ideas of consistency, minimal competency, and graph theory. The maintenance phase will be aided by having well designed and documented KBS software.

  1. 48 CFR 2137.102 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 2137.102 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT, FEDERAL EMPLOYEES GROUP... Contractor will be reimbursed for all reasonable phase-in and phase-out costs (i.e., costs incurred within the agreed-upon period after contract termination that result from phase-in and phase-out operations...

  2. On compensation of four wave mixing effect in dispersion managed hybrid WDM-OTDM multicast overlay system with optical phase conjugation modules

    NASA Astrophysics Data System (ADS)

    Singh, Sukhbir; Singh, Surinder

    2017-11-01

    This paper investigated the effect of FWM and its suppression using optical phase conjugation modules in dispersion managed hybrid WDM-OTDM multicast overlay system. Interaction between propagating wavelength signals at higher power level causes new FWM component generation that can significant limit the system performance. OPC module consists of the pump signal and 0.6 km HNLF implemented in midway of optical link to generate destructive phase FWM components. Investigation revealed that by use of even OPC module in optical link reduces the FWM power and mitigate the interaction between wavelength signals at variable signal input power, dispersion parameter (β2) and transmission distance. System performance comparison is also made between without DM-OPC module, with DM and with DM-OPC module in scenario of FWM tolerance. The BER performance of hybrid WDM-OTDM multicast system using OPC module is improved by multiplication factor of 2 as comparable to dispersion managed and coverage distance is increased by factor of 2 as in Singh and Singh (2016).

  3. Development of a Web-Enabled Informatics Platform for Manipulation of Gene Expression Data

    DTIC Science & Technology

    2004-12-01

    genomic platforms such as metabolomics and proteomics , and to federated databases for knowledge management. A successful SBIR Phase I completed...measurements that require sophisticated bioinformatic platforms for data archival, management, integration, and analysis if researchers are to derive...web-enabled bioinformatic platform consisting of a Laboratory Information Management System (LIMS), an Analysis Information Management System (AIMS

  4. Development of the digital design environment ProjectWise(TM) - phase 1.

    DOT National Transportation Integrated Search

    2017-04-28

    The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...

  5. Inventory of system operations data collection and use in the Virginia Department of Transportation.

    DOT National Transportation Integrated Search

    2006-01-01

    Accurate data describing the status of the transportation network is the backbone of system operations management. Without accurate data, traffic engineers cannot optimize signal phasing and timing, effective incident management cannot be undertaken,...

  6. CTAS and NASA Air Traffic Management Fact Sheets for En Route Descent Advisor and Surface Management System

    NASA Technical Reports Server (NTRS)

    Lee, Katharine

    2004-01-01

    The Surface Management System (SMS) is a decision support tool that will help controllers, traffic managers, and NAS users manage the movements of aircraft on the surface of busy airports, improving capacity, efficiency, and flexibility. The Advanced Air Transportation Technologies (AATT) Project at NASA is developing SMS in cooperation with the FAA's Free Flight Phase 2 (FFP2) pro5ram. SMS consists of three parts: a traffic management tool, a controller tool, and a National Airspace System (NAS) information tool.

  7. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  8. Louisville region demonstration of travel management coordination center : system pre-deployment preparation.

    DOT National Transportation Integrated Search

    2013-03-01

    The purpose of the Greater Louisville Region Demonstration of Travel Management Coordination Center (TMCC): System Pre-Deploy-ment Preparation grant was to further phased implementation of the regions TMCC design by focusing on two major component...

  9. An expert system as applied to bridges : software development phase.

    DOT National Transportation Integrated Search

    1989-01-01

    This report describes the results of the third of a four-part study dealing with the use of a computerized expert system to assist bridge engineers in their structures management program. In this phase of the study, software (called DOBES) was writte...

  10. Chaos or transformation? Managing innovation.

    PubMed

    Manion, J

    1993-05-01

    Nurse innovation is the key to transformation of the healthcare organization and the healthcare system. This article offers the nurse executive and the leadership team a way to assess innovative tendencies of their department or organization and determine where strengths and trouble spots exist. The author discusses a five-phase innovation management process with suggested interventions for each phase.

  11. Spacelab data management subsystem phase B study

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Spacelab data management system is described. The data management subsystem (DMS) integrates the avionics equipment into an operational system by providing the computations, logic, signal flow, and interfaces needed to effectively command, control, monitor, and check out the experiment and subsystem hardware. Also, the DMS collects/retrieves experiment data and other information by recording and by command of the data relay link to ground. The major elements of the DMS are the computer subsystem, data acquisition and distribution subsystem, controls and display subsystem, onboard checkout subsystem, and software. The results of the DMS portion of the Spacelab Phase B Concept Definition Study are analyzed.

  12. Thermal management system options for high power space platforms

    NASA Technical Reports Server (NTRS)

    Sadunas, J. A.; Lehtinen, A.; Parish, R.

    1985-01-01

    Thermal Management System (TMS) design options for a high power (75kWe), low earth orbit, multimodule space platform were investigated. The approach taken was to establish a baseline TMS representative of current technology, and to make incremental improvements through successive subsystem trades that lead to a candidate TMS. The TMS trades included centralized and decentralized transport, single-phase and two-phase transport, alternate working fluids, liquid loop and heat pipe radiators, deployed fixed, body mounted and steerable radiators, and thermal storage. The subsystem options were evaluated against criteria such as weight, TMS power requirement, reliability, system isothermality penalty, and growth potential.

  13. Title IV Cash Management Life Cycle Training. Participant's Guide.

    ERIC Educational Resources Information Center

    Department of Education, Washington, DC.

    This participant's guide includes: "Introduction: Welcome to Cash Management Life Cycle Training"; "Module 1: Review of Cash Management Principles" (cash management overview and activity); "Module 2: Common Origination and Disbursement (COD) System Overview" (e.g., full participants and phase-in participants, COD…

  14. Understanding the potential role of mobile phone-based monitoring on asthma self-management: qualitative study.

    PubMed

    Pinnock, H; Slack, R; Pagliari, C; Price, D; Sheikh, A

    2007-05-01

    National and international healthcare policy increasingly seeks technological solutions to the challenge of providing care for people with long-term conditions. Novel technologies, however, have the potential to change the dynamics of disease monitoring and self-management. We aimed to explore the opinions and concerns of people with asthma and primary care clinicians on the potential role of mobile phone monitoring technology (transmitting symptoms and peak flows, with immediate feedback of control and reminder of appropriate actions) in supporting asthma self-management. This qualitative study recruited 48 participants (34 adults and teenagers with asthma, 14 asthma nurses and doctors) from primary care in Lothian (Central Scotland) and Kent (South East England). Thirty-nine participated in six focus groups, which included a demonstration of the technology; nine gave in-depth interviews before and after a 4-week trial of the technology. Participants considered that mobile phone-based monitoring systems can facilitate guided self-management although, paradoxically, may engender dependence on professional/technological support. In the early phases, as patients are learning to accept, understand and control their asthma, this support was seen as providing much-needed confidence. During the maintenance phase, when self-management predominates, patient and professionals were concerned that increased dependence may be unhelpful, although they appreciated that maintaining an on-going record could facilitate consultations. Mobile phone-based monitoring systems have the potential to support guided self-management by aiding transition from clinician-supported early phases to effective self-management during the maintenance phase. Continuing development, adoption and formal evaluation of these systems should take account of the insights provided by our data.

  15. Integrated corridor management initiative : demonstration phase evaluation, San Diego decision support system analysis test plan.

    DOT National Transportation Integrated Search

    2000-01-01

    This report demonstrates the benefits and potential pitfalls of deploying and operating an integrated freeway and arterial management system. In particular, it discusses the lessons learned about the Medical Center Corridor (MCC) Project deployed in ...

  16. Integrated corridor management initiative : demonstration phase evaluation - Dallas decision support system analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Decision Support System (DSS) Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration....

  17. UWR/MSAA demonstration of coordinated human-services transportation models - phase II : phased implementation.

    DOT National Transportation Integrated Search

    2012-12-01

    This report presents the results of a 16-month project for system development and design of a model for a Travel Management Coordination Center (TMCC) using ITS capabilities. The system was designed as a tool to facilitate the exchange of knowledge a...

  18. MIS Development in Higher Education: A Framework for Systems Planning.

    ERIC Educational Resources Information Center

    St. John, Edward P.

    An institutional management systems development study examined the Management Information Systems (MIS) needs of 23 public institutions of higher education in Missouri. The result was a model framework for other institutions to develop MIS appropriate to their needs. One of five distinct structural development phases could be related to all…

  19. Developing mobile- and BIM-based integrated visual facility maintenance management system.

    PubMed

    Lin, Yu-Cheng; Su, Yu-Chih

    2013-01-01

    Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool.

  20. CAD/CAM data management needs, requirements and options

    NASA Technical Reports Server (NTRS)

    Lopatka, R. S.; Johnson, T. G.

    1978-01-01

    The requirements for a data management system in support of technical or scientific applications and possible courses of action were reviewed. Specific requirements were evolved while working towards higher level integration impacting all phases of the current design process and through examination of commercially marketed systems and related data base research. Arguments are proposed for varied approaches in implementing data base systems ranging from no action necessary to immediate procurement of an existing data base management system.

  1. Exploring Capabilities of Electrical Capacitance Tomography Sensor and Velocity Analysis of Two-Phase R-134A Flow Through a Sudden Expansion

    DTIC Science & Technology

    2017-05-01

    SUDDEN EXPANSION 5a. CONTRACT NUMBER In-house 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 62203F 6. AUTHOR(S) Joseph Michael Cronin 5d. PROJECT ...heat transfer in order to manage the ever-increasing airframe and engine heat loads. Two-phase liquid-vapor refrigerant systems are one solution for...were compared with pressure drop correlations. 15. SUBJECT TERMS thermal management , two-phase flow, flow visualization, electric capacitance

  2. A pavement management system for concrete roadways in Virginia : phase I : condition ratings : final report.

    DOT National Transportation Integrated Search

    1988-01-01

    This report traces the development of a rating system proposed by the author and reviewed by a subcommittee of the Pavement Management Research Advisory Committee for use in evaluating the service condition of Virginia's Portland cement concrete pave...

  3. An approach to knowledge structuring for advanced phases of the Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Goranson, H. T.

    1986-01-01

    The Technical and Management Information System (TMIS) must employ on enlightened approach to its object structure, but basic issues in conceptual structuring remain to be resolved. Sirius outlines the necessary agenda and reports on progress toward solutions.

  4. Development and Testing of a Prototype Connected Vehicle Wrong-Way Driving Detection and Management System

    DOT National Transportation Integrated Search

    2018-02-01

    The primary objective of Phase II was to develop a prototype connected vehicle wrong-way driving detection and management system at the Texas A&M University Respect, Excellence, Leadership, Loyalty, Integrity, Selfless Service (RELLIS) campus. The pu...

  5. Vehicle System Management Modeling in UML for Ares I

    NASA Technical Reports Server (NTRS)

    Pearson, Newton W.; Biehn, Bradley A.; Curry, Tristan D.; Martinez, Mario R.

    2011-01-01

    The Spacecraft & Vehicle Systems Department of Marshall Space Flight Center is responsible for modeling the Vehicle System Management for the Ares I vehicle which was a part of the now canceled Constellation Program. An approach to generating the requirements for the Vehicle System Management was to use the Unified Modeling Language technique to build and test a model that would fulfill the Vehicle System Management requirements. UML has been used on past projects (flight software) in the design phase of the effort but this was the first attempt to use the UML technique from a top down requirements perspective.

  6. Animal Telemetry Network Data Assembly Center: Phase 2

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Animal telemetry network data assembly center: Phase...2 Barbara Block & Randy Kochevar Hopkins Marine Station Stanford University 120 Oceanview Blvd. Pacific Grove, Ca phone: (831) 655-6236...prior development for tag data management (e.g. TOPP, GTOPP, GulfTOPP) of animal telemetry data management into a single system (DAC) with an

  7. Long-term nitrous oxide fluxes in annual and perennial agricultural and unmanaged ecosystems in the upper Midwest USA

    DOE PAGES

    Gelfand, Ilya; Shcherbak, Iurii; Millar, Neville; ...

    2016-08-11

    Differences in soil nitrous oxide (N 2O) fluxes among ecosystems are often difficult to evaluate and predict due to high spatial and temporal variabilities and few direct experimental comparisons. For 20 years, we measured N 2O fluxes in 11 ecosystems in southwest Michigan USA: four annual grain crops (corn–soybean–wheat rotations) managed with conventional, no-till, reduced input, or biologically based/organic inputs; three perennial crops (alfalfa, poplar, and conifers); and four unmanaged ecosystems of different successional age including mature forest. Average N 2O emissions were higher from annual grain and N-fixing cropping systems than from nonleguminous perennial cropping systems and were low across unmanaged ecosystems. Among annual cropping systems full-rotation fluxes were indistinguishable from one another but rotation phase mattered. For example, those systems with cover crops and reduced fertilizer N emitted more N 2O during the corn and soybean phases, but during the wheat phase fluxes were ~40% lower. Likewise, no-till did not differ from conventional tillage over the entire rotation but reduced emissions ~20% in the wheat phase and increased emissions 30–80% in the corn and soybean phases. Greenhouse gas intensity for the annual crops (flux per unit yield) was lowest for soybeans produced under conventional management, while for the 11 other crop 9 management combinations intensities were similar to one another. Among the fertilized systems, emissions ranged from 0.30 to 1.33 kg N 2O-N ha -1 yr -1 and were best predicted by IPCC Tier 1 and DEF emission factor approaches. Annual cumulative fluxes from perennial systems were best explained by soil NOmore » $$-\\atop{3}$$ pools (r 2 = 0.72) but not so for annual crops, where management differences overrode simple correlations. Daily soil N 2O emissions were poorly predicted by any measured variables. Overall, long-term measurements reveal lower fluxes in nonlegume perennial vegetation and, for conservatively fertilized annual crops, the overriding influence of rotation phase on annual fluxes.« less

  8. Long-term nitrous oxide fluxes in annual and perennial agricultural and unmanaged ecosystems in the upper Midwest USA.

    PubMed

    Gelfand, Ilya; Shcherbak, Iurii; Millar, Neville; Kravchenko, Alexandra N; Robertson, G Philip

    2016-11-01

    Differences in soil nitrous oxide (N 2 O) fluxes among ecosystems are often difficult to evaluate and predict due to high spatial and temporal variabilities and few direct experimental comparisons. For 20 years, we measured N 2 O fluxes in 11 ecosystems in southwest Michigan USA: four annual grain crops (corn-soybean-wheat rotations) managed with conventional, no-till, reduced input, or biologically based/organic inputs; three perennial crops (alfalfa, poplar, and conifers); and four unmanaged ecosystems of different successional age including mature forest. Average N 2 O emissions were higher from annual grain and N-fixing cropping systems than from nonleguminous perennial cropping systems and were low across unmanaged ecosystems. Among annual cropping systems full-rotation fluxes were indistinguishable from one another but rotation phase mattered. For example, those systems with cover crops and reduced fertilizer N emitted more N 2 O during the corn and soybean phases, but during the wheat phase fluxes were ~40% lower. Likewise, no-till did not differ from conventional tillage over the entire rotation but reduced emissions ~20% in the wheat phase and increased emissions 30-80% in the corn and soybean phases. Greenhouse gas intensity for the annual crops (flux per unit yield) was lowest for soybeans produced under conventional management, while for the 11 other crop × management combinations intensities were similar to one another. Among the fertilized systems, emissions ranged from 0.30 to 1.33 kg N 2 O-N ha -1  yr -1 and were best predicted by IPCC Tier 1 and ΔEF emission factor approaches. Annual cumulative fluxes from perennial systems were best explained by soil NO3- pools (r 2  = 0.72) but not so for annual crops, where management differences overrode simple correlations. Daily soil N 2 O emissions were poorly predicted by any measured variables. Overall, long-term measurements reveal lower fluxes in nonlegume perennial vegetation and, for conservatively fertilized annual crops, the overriding influence of rotation phase on annual fluxes. © 2016 The Authors. Global Change Biology Published by John Wiley & Sons Ltd.

  9. Introduction to Defense Acquisition Management

    DTIC Science & Technology

    1989-03-01

    the system after Most new systems follow the same formatted and its usefullness in the weapon inventory predictable life cycle, and fit the model...natives for system concept development Statement (MNS) setting forth requirements need- -An acquisition strategy is developed to guide ed to meet the...6 BUSINESS, FINANCIAL AND TECHNICAL ASPECTS OF SYSTEMS ACQUISITION Management of the systems acquisition process The acquisition planning phase of the

  10. A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System

    PubMed Central

    Andújar-Montoya, María Dolores

    2017-01-01

    The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way. PMID:28737693

  11. A Context-Driven Model for the Flat Roofs Construction Process through Sensing Systems, Internet-of-Things and Last Planner System.

    PubMed

    Andújar-Montoya, María Dolores; Marcos-Jorquera, Diego; García-Botella, Francisco Manuel; Gilart-Iglesias, Virgilio

    2017-07-22

    The main causes of building defects are errors in the design and the construction phases. These causes related to construction are mainly due to the general lack of control of construction work and represent approximately 75% of the anomalies. In particular, one of the main causes of such anomalies, which end in building defects, is the lack of control over the physical variables of the work environment during the execution of tasks. Therefore, the high percentage of defects detected in buildings that have the root cause in the construction phase could be avoidable with a more accurate and efficient control of the process. The present work proposes a novel integration model based on information and communications technologies for the automation of both construction work and its management at the execution phase, specifically focused on the flat roof construction process. Roofs represent the second area where more defects are claimed. The proposed model is based on a Web system, supported by a service oriented architecture, for the integral management of tasks through the Last Planner System methodology, but incorporating the management of task restrictions from the physical environment variables by designing specific sensing systems. Likewise, all workers are integrated into the management process by Internet-of-Things solutions that guide them throughout the execution process in a non-intrusive and transparent way.

  12. Noise management to achieve superiority in quantum information systems

    NASA Astrophysics Data System (ADS)

    Nemoto, Kae; Devitt, Simon; Munro, William J.

    2017-06-01

    Quantum information systems are expected to exhibit superiority compared with their classical counterparts. This superiority arises from the quantum coherences present in these quantum systems, which are obviously absent in classical ones. To exploit such quantum coherences, it is essential to control the phase information in the quantum state. The phase is analogue in nature, rather than binary. This makes quantum information technology fundamentally different from our classical digital information technology. In this paper, we analyse error sources and illustrate how these errors must be managed for the system to achieve the required fidelity and a quantum superiority. This article is part of the themed issue 'Quantum technology for the 21st century'.

  13. Noise management to achieve superiority in quantum information systems.

    PubMed

    Nemoto, Kae; Devitt, Simon; Munro, William J

    2017-08-06

    Quantum information systems are expected to exhibit superiority compared with their classical counterparts. This superiority arises from the quantum coherences present in these quantum systems, which are obviously absent in classical ones. To exploit such quantum coherences, it is essential to control the phase information in the quantum state. The phase is analogue in nature, rather than binary. This makes quantum information technology fundamentally different from our classical digital information technology. In this paper, we analyse error sources and illustrate how these errors must be managed for the system to achieve the required fidelity and a quantum superiority.This article is part of the themed issue 'Quantum technology for the 21st century'. © 2017 The Author(s).

  14. Medical information, communication, and archiving system (MICAS): Phase II integration and acceptance testing

    NASA Astrophysics Data System (ADS)

    Smith, Edward M.; Wandtke, John; Robinson, Arvin E.

    1999-07-01

    The Medical Information, Communication and Archive System (MICAS) is a multi-modality integrated image management system that is seamlessly integrated with the Radiology Information System (RIS). This project was initiated in the summer of 1995 with the first phase being installed during the first half of 1997 and the second phase installed during the summer of 1998. Phase II enhancements include a permanent archive, automated workflow including modality worklist, study caches, NT diagnostic workstations with all components adhering to Digital Imaging and Communications in Medicine (DICOM) standards. This multi-vendor phased approach to PACS implementation is designed as an enterprise-wide PACS to provide images and reports throughout our healthcare network. MICAS demonstrates that aa multi-vendor open system phased approach to PACS is feasible, cost-effective, and has significant advantages over a single vendor implementation.

  15. Autonomous Satellite Command and Control Through the World Wide Web. Phase 3

    NASA Technical Reports Server (NTRS)

    Cantwell, Brian; Twiggs, Robert

    1998-01-01

    The Automated Space System Experimental Testbed (ASSET) system is a simple yet comprehensive real-world operations network being developed. Phase 3 of the ASSET Project was January-December 1997 and is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer. (2) Support prioritized handling of multiple (PIs) Principle Investigators as well as associated payload experimenters. (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft. (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware. (5) Implement a beacon monitoring test. (6) Implement an experimental blackboard controller for space system management. (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals are examined. Significant sections of this report were also published as a conference paper. Several publications produced in support of this grant are included as attachments. Titles include: 1) Experimental Initiatives in Space System Operations; 2) The ASSET Client Interface: Balancing High Level Specification with Low Level Control; 3) Specifying Spacecraft Operations At The Product/Service Level; 4) The Design of a Highly Configurable, Reusable Operating System for Testbed Satellites; 5) Automated Health Operations For The Sapphire Spacecraft; 6) Engineering Data Summaries for Space Missions; and 7) Experiments In Automated Health Assessment And Notification For The Sapphire Microsatellite.

  16. ERCMExpress. Volume 2, Issue 6

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This issue of ERCMExpress presents "The National Incident Management System" (NIMS) is the United States' uniform system for managing domestic incidents and is suitable for schools to implement in the four phases of their crisis planning: (1) prevention-mitigation; (2) preparedness; (4) recovery. The NIMS is a comprehensive approach to…

  17. Phase I Recommendations by the Air Quality Management Work Group to the Clean Air Act Advisory Committee

    EPA Pesticide Factsheets

    Recommendations to the Clean Air Act Advisory Committee by Air Quality Management Work Group addressing the recommendations made by the National Research Council to improve the U.S. air quality management system.

  18. 48 CFR 2152.237-70 - Continuity of services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... 2152.237-70 Section 2152.237-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Government or another Contractor, may continue them. The Contractor agrees to furnish phase-in training and...) The Contractor shall, upon the Contracting Officer's written notice, (1) furnish phase-in and phase...

  19. Converging Redundant Sensor Network Information for Improved Building Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dale Tiller; D. Phil; Gregor Henze

    2007-09-30

    This project investigated the development and application of sensor networks to enhance building energy management and security. Commercial, industrial and residential buildings often incorporate systems used to determine occupancy, but current sensor technology and control algorithms limit the effectiveness of these systems. For example, most of these systems rely on single monitoring points to detect occupancy, when more than one monitoring point could improve system performance. Phase I of the project focused on instrumentation and data collection. During the initial project phase, a new occupancy detection system was developed, commissioned and installed in a sample of private offices and open-planmore » office workstations. Data acquisition systems were developed and deployed to collect data on space occupancy profiles. Phase II of the project demonstrated that a network of several sensors provides a more accurate measure of occupancy than is possible using systems based on single monitoring points. This phase also established that analysis algorithms could be applied to the sensor network data stream to improve the accuracy of system performance in energy management and security applications. In Phase III of the project, the sensor network from Phase I was complemented by a control strategy developed based on the results from the first two project phases: this controller was implemented in a small sample of work areas, and applied to lighting control. Two additional technologies were developed in the course of completing the project. A prototype web-based display that portrays the current status of each detector in a sensor network monitoring building occupancy was designed and implemented. A new capability that enables occupancy sensors in a sensor network to dynamically set the 'time delay' interval based on ongoing occupant behavior in the space was also designed and implemented.« less

  20. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 1 : outreach and commercialization of IRSV prototype.

    DOT National Transportation Integrated Search

    2012-03-01

    The Integrated Remote Sensing and Visualization System (IRSV) was developed in Phase One of this project in order to : accommodate the needs of todays Bridge Engineers at the state and local level. Overall goals of this project are: : Better u...

  1. Development of uniform sections for pavement management system inventory and application : interim report.

    DOT National Transportation Integrated Search

    2007-12-01

    This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...

  2. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  3. 78 FR 20960 - Order Temporarily Exempting Certain Broker-Dealers From the Recordkeeping, Reporting, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ...'s own trading system (other than any risk management controls established for purposes of compliance... establishing a two-phased approach to implementation.\\6\\ In the first phase, the Commission provided a... through a sponsored access arrangement \\8\\ (``Phase One''). In the [[Page 20961

  4. Engagement and Termination in Marital and Familial Therapy: Special Ethical Issues.

    ERIC Educational Resources Information Center

    Wilcoxon, S. Allen; Gladding, Samuel T.

    1985-01-01

    Addresses ethical issues in the engagement and termination phases of marital and family therapy. Engagement phase must examine commitment to systemic intervention versus serving motivated clients. Termination phase must examine client's and therapist's ways of managing readiness, prematurity, and follow-up. Proposed solutions are suggested. (ABL)

  5. Spent Nuclear Fuel (SNF) project Integrated Safety Management System phase I and II Verification Review Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CARTER, R.P.

    1999-11-19

    The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.

  6. An Analysis of Program Managers as Total Life Cycle Systems Managers

    DTIC Science & Technology

    2017-09-01

    S) AND ADDRESS(ES) N/A 10. SPONSORING / MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of...Total Life Cycle Systems Management (TLCSM) is a term used in Army Regulation ( AR ) 70-1 to describe the responsibility of the Army Program Manager (PM...away from the PM. However, other Army guidance challenges AR 70-1 when transitioning to the Operations and Support phase of the acquisition life

  7. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 5 : automated management bridge information system.

    DOT National Transportation Integrated Search

    2009-12-01

    This volume focuses on one of the key components of the IRSV system, i.e., the AMBIS module. This module serves as one of : the tools used in this study to translate raw remote sensing data in the form of either high-resolution aerial photos or v...

  8. National Day Care Study First Annual Report. Volume III: Information Management and Data Collection Systems.

    ERIC Educational Resources Information Center

    Goodrich, Nancy; And Others

    Volume III of the National Day Care Study First Annual Report funded by the Office of Child Development describes the information management system which was developed and tested during Phase I. In addition, the volume includes overviews of the sample instruments from the three major data collection systems developed during the year: the Research…

  9. Use of a Content Management System for Blended Learning: Perceptions of Pre-Service Teachers

    ERIC Educational Resources Information Center

    Altun, Arif; Gulbahar, Yasemin; Madran, Orcun

    2008-01-01

    This study presents the development, implementation and evaluation phases of a content management system to be used in higher education settings in a blended learning environment. The purpose of this study is twofold. First, it is aimed to observe how pre-service teacher trainees interacted within the system when they are given the tool to…

  10. Developing Mobile- and BIM-Based Integrated Visual Facility Maintenance Management System

    PubMed Central

    Su, Yu-Chih

    2013-01-01

    Facility maintenance management (FMM) has become an important topic for research on the operation phase of the construction life cycle. Managing FMM effectively is extremely difficult owing to various factors and environments. One of the difficulties is the performance of 2D graphics when depicting maintenance service. Building information modeling (BIM) uses precise geometry and relevant data to support the maintenance service of facilities depicted in 3D object-oriented CAD. This paper proposes a new and practical methodology with application to FMM using BIM technology. Using BIM technology, this study proposes a BIM-based facility maintenance management (BIMFMM) system for maintenance staff in the operation and maintenance phase. The BIMFMM system is then applied in selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FMM practice. Using the BIMFMM system, maintenance staff can access and review 3D BIM models for updating related maintenance records in a digital format. Moreover, this study presents a generic system architecture and its implementation. The combined results demonstrate that a BIMFMM-like system can be an effective visual FMM tool. PMID:24227995

  11. Flow Pattern Phenomena in Two-Phase Flow in Microchannels

    NASA Astrophysics Data System (ADS)

    Keska, Jerry K.; Simon, William E.

    2004-02-01

    Space transportation systems require high-performance thermal protection and fluid management techniques for systems ranging from cryogenic fluid management devices to primary structures and propulsion systems exposed to extremely high temperatures, as well as for other space systems such as cooling or environment control for advanced space suits and integrated circuits. Although considerable developmental effort is being expended to bring potentially applicable technologies to a readiness level for practical use, new and innovative methods are still needed. One such method is the concept of Advanced Micro Cooling Modules (AMCMs), which are essentially compact two-phase heat exchangers constructed of microchannels and designed to remove large amounts of heat rapidly from critical systems by incorporating phase transition. The development of AMCMs requires fundamental technological advancement in many areas, including: (1) development of measurement methods/systems for flow-pattern measurement/identification for two-phase mixtures in microchannels; (2) development of a phenomenological model for two-phase flow which includes the quantitative measure of flow patterns; and (3) database development for multiphase heat transfer/fluid dynamics flows in microchannels. This paper focuses on the results of experimental research in the phenomena of two-phase flow in microchannels. The work encompasses both an experimental and an analytical approach to incorporating flow patterns for air-water mixtures flowing in a microchannel, which are necessary tools for the optimal design of AMCMs. Specifically, the following topics are addressed: (1) design and construction of a sensitive test system for two-phase flow in microchannels, one which measures ac and dc components of in-situ physical mixture parameters including spatial concentration using concomitant methods; (2) data acquisition and analysis in the amplitude, time, and frequency domains; and (3) analysis of results including evaluation of data acquisition techniques and their validity for application in flow pattern determination.

  12. ITS Architecture Development Program, Phase I; Summary Report

    DOT National Transportation Integrated Search

    1994-11-01

    IN-VEHICLE EMISSIONS DIAGNOSIS, COMMERCIAL VEHICLES OPERATIONS OR CVO, ADVANCED VEHICLE CONTROL AND SAFETY SYSTEMS OR AVCSS, ADVANCED PUBLIC TRANSPORTATION SYSTEMS OR APTS, INCIDENT MANAGEMENT/INCIDENT DETECTION, COLLISION AVOIDANCE SYSTEM, AUTOMATED...

  13. Thermal management of instruments on space platforms using a high capacity two-phase heat transport system

    NASA Technical Reports Server (NTRS)

    Ollendorf, S.; Fowle, A.; Almgren, D.

    1981-01-01

    A system utilizing a pumped, two-phase single component working fluid for heat exchange and transport services necessary to meet the temperature control requirements of typical orbiting instrument payloads on space platforms is described. The design characteristics of the system is presented, together with a presentation of a laboratory apparatus for demonstration of proof of concept. Results indicate that the pumped two-phase design concept can meet a wide range of thermal performance requirements with the only penalty being the requirement for a small liquid pump.

  14. Process Improvement Teams: A TQM Strategy for Improving Community College Systems.

    ERIC Educational Resources Information Center

    Needham, Robbie Lee; And Others

    The three principle elements of Total Quality Management (TQM) are a focus on customers; an attitude of continuous improvement of a system; and the involvement of everyone within an organization. At Delaware County Community College (DCCC) in Media, Pennsylvania, the first phase of implementing TQM focused on educating top management for the…

  15. 1989-90 Implementation of the Management Information System.

    ERIC Educational Resources Information Center

    Hamre, William; Holsclaw, Mick

    For the past three years, the Board of Governors has made the development and implementation of the California Community College Management Information System (MIS) a major priority. Following two years of pilot testing with five community college districts, statewide implementation of Phase I of MIS is slated to begin in July/August 1989. Several…

  16. International System and Foreign Policy Approaches: Implications for Conflict Modelling and Management

    DTIC Science & Technology

    tool for conflict management , preliminary version of which is the Computer Aided Conflict Information System. Using expert judgments to describe...1961. The combined model is more relevant during the crisis phase. The results have implications for conflict modelling. With respect to conflict ... management , there is an important implication. Since the organizational processes model may be more valid than an event interaction model, then conflict

  17. Impact of Dispersion Slope on SPM Degradation in WDM Systems With High Channel Count

    NASA Astrophysics Data System (ADS)

    Luí; S, Ruben S.; Cartaxo, Adolfo V. T.

    2005-11-01

    Dispersion management design in wavelength division multiplexing (WDM) intensity modulation-direct detection (IM-DD) systems is often difficult due to the complex relation between the dispersion-management parameters (inline and total residual dispersion) and nonlinear impairments, such as cross-phase modulation (XPM). In this paper, we investigate the dependence of the XPM degradation on the dispersion-management parameters of a two-channel system. Afterwards, the XPM degradation on systems with high channel count (161 channels) is analytically evaluated, and the observed behaviors are explained using the results obtained with a two-channel system. In the absence of dispersion-slope compensation (DSC), significant differences in the XPM degradation of different channels in the same system are shown. Such differences result mainly from the strong dependence of the phase-modulation-to-intensity-modulation conversion of the XPM on the dispersion-management parameters of each channel. Due to this dependence, numerical results show that, unlike systems without dispersion compensation (DC), the XPM degradation may increase steadily with the channel count, and the worst-case channel may not be the center channel of the transmitted band. DSC allows a remarkable equalization of the XPM degradation along the transmitted band, facilitating dispersion-management planning. However, variations of the dispersion parameter and excessive residual dispersion that is not compensated may still induce a tilt of the XPM degradation along the transmitted band.

  18. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 3 : advanced consideration in LiDAR technology for bridge evaluation.

    DOT National Transportation Integrated Search

    2012-03-01

    This report describes Phase Two enhancement of terrestrial LiDAR scanning for bridge damage : evaluation that was initially developed in Phase One. Considering the spatial and reflectivity : information contained in LiDAR scans, two detection algorit...

  19. Recent Improvement Of The Institutional Radioactive Waste Management System In Slovenia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sueiae, S.; Fabjan, M.; Hrastar, U.

    2008-07-01

    The task of managing institutional radioactive waste was assigned to the Slovenian National Agency for Radwaste Management by the Governmental Decree of May 1999. This task ranges from the collection of waste at users' premises to the storage in the Central Storage Facility in (CSF) and afterwards to the planned Low and Intermediate Level Waste (LILW) repository. By this Decree ARAO also became the operator of the CSF. The CSF has been in operation since 1986. Recent improvements of the institutional radioactive waste management system in Slovenia are presented in this paper. ARAO has been working on the reestablishment ofmore » institutional radioactive waste management since 1999. The Agency has managed to prepare the most important documents and carry out the basic activities required by the legislation to assure a safe and environmentally acceptable management of the institutional radioactive waste. With the aim to achieve a better organized operational system, ARAO took the advantage of the European Union Transition Facility (EU TF) financing support and applied for the project named 'Improvement of the management of institutional radioactive waste in Slovenia via the design and implementation of an Information Business System'. Through a public invitation for tenders one of the Slovenian largest software company gained the contract. Two international radwaste experts from Belgium were part of their project team. The optimization of the operational system has been carried out in 2007. The project was executed in ten months and it was divided into two phases. The first phase of the project was related with the detection of weaknesses and implementation of the necessary improvements in the current ARAO operational system. With the evaluation of the existing system, possible improvements were identified. In the second phase of the project the software system Information Business System (IBS) was developed and implemented by the group of IT experts. As a software development life-cycle methodology the Waterfall methodology was used. The reason for choosing this methodology lied in its simple approach: analyze the problem, design the solution, implement the code, test the code, integrate and deploy. ARAO's institutional radioactive waste management process was improved in the way that it is more efficient, better organized, allowing traceability and availability of all documents and operational procedures within the field of institutional radioactive waste. The tailored made IBS system links all activities of the institutional radioactive waste management process: collection, transportation, takeover, acceptance, storing, treatment, radiation protection, etc. into one management system. All existing and newly designed evidences, operational procedures and other documents can be searched and viewed via secured Internet access from different locations. (authors)« less

  20. Recognition and management of idiopathic systemic capillary leak syndrome: an evidence-based review.

    PubMed

    Baloch, Noor Ul-Ain; Bikak, Marvi; Rehman, Abdul; Rahman, Omar

    2018-05-01

    Idiopathic systemic capillary leak syndrome (SCLS) is a unique disorder characterized by episodes of massive systemic leak of intravascular fluid leading to volume depletion and shock. A typical attack of SCLS consists of prodromal, leak and post-leak phases. Complications, such as compartment syndrome and pulmonary edema, usually develop during the leak and post-leak phases respectively. Judicious intravenous hydration and early use of vasopressors is the cornerstone of management in such cases. Areas covered: The purpose of the present review is to provide an up-to-date, evidence-based review of our understanding of SCLS and its management in the light of currently available evidence. Idiopathic SCLS was first described in 1960 and, since then, more than 250 cases have been reported. A large number of cases have been reported over the past one decade, most likely due to improved recognition. In the acute care setting, most patients with SCLS are managed as per the Surviving Sepsis guidelines and receive aggressive volume resuscitation - which is not the optimal management strategy for such patients. There is a need to raise awareness amongst physicians and clinicians in order to improve recognition of this disorder and ensure its appropriate management.

  1. A computer aided engineering tool for ECLS systems

    NASA Technical Reports Server (NTRS)

    Bangham, Michal E.; Reuter, James L.

    1987-01-01

    The Computer-Aided Systems Engineering and Analysis tool used by NASA for environmental control and life support system design studies is capable of simulating atmospheric revitalization systems, water recovery and management systems, and single-phase active thermal control systems. The designer/analysis interface used is graphics-based, and allows the designer to build a model by constructing a schematic of the system under consideration. Data management functions are performed, and the program is translated into a format that is compatible with the solution routines.

  2. Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope

    NASA Astrophysics Data System (ADS)

    Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.

    2012-09-01

    Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.

  3. Health Care Financing Administration--Medicaid program; Medicaid management information systems. Final rule.

    PubMed

    1980-03-05

    These regulations set forth a new procedure to improve Medicaid management by explicitly authorizing HCFA to expand or revise State Medicaid Management Information Systems (MMIS) as necessary to meet program needs. Under this procedure, HCFA will publish major new requirements for comment before deciding to adopt them, and will provide increased Federal matching and reasonable phase-in time for their implementation. HCFA will also periodically review ongoing systems to determine whether all system requirements and performance standards are being met and may reduce the level of Federal matching for those MMIS systems which do not meet prescribed standards.

  4. Automated flight test management system

    NASA Technical Reports Server (NTRS)

    Hewett, M. D.; Tartt, D. M.; Agarwal, A.

    1991-01-01

    The Phase 1 development of an automated flight test management system (ATMS) as a component of a rapid prototyping flight research facility for artificial intelligence (AI) based flight concepts is discussed. The ATMS provides a flight engineer with a set of tools that assist in flight test planning, monitoring, and simulation. The system is also capable of controlling an aircraft during flight test by performing closed loop guidance functions, range management, and maneuver-quality monitoring. The ATMS is being used as a prototypical system to develop a flight research facility for AI based flight systems concepts at NASA Ames Dryden.

  5. Design of a simulation environment for laboratory management by robot organizations

    NASA Technical Reports Server (NTRS)

    Zeigler, Bernard P.; Cellier, Francois E.; Rozenblit, Jerzy W.

    1988-01-01

    This paper describes the basic concepts needed for a simulation environment capable of supporting the design of robot organizations for managing chemical, or similar, laboratories on the planned U.S. Space Station. The environment should facilitate a thorough study of the problems to be encountered in assigning the responsibility of managing a non-life-critical, but mission valuable, process to an organized group of robots. In the first phase of the work, we seek to employ the simulation environment to develop robot cognitive systems and strategies for effective multi-robot management of chemical experiments. Later phases will explore human-robot interaction and development of robot autonomy.

  6. Development of a methodology for strategic environmental assessment: application to the assessment of golf course installation policy in Taiwan.

    PubMed

    Chen, Ching-Ho; Wu, Ray-Shyan; Liu, Wei-Lin; Su, Wen-Ray; Chang, Yu-Min

    2009-01-01

    Some countries, including Taiwan, have adopted strategic environmental assessment (SEA) to assess and modify proposed policies, plans, and programs (PPPs) in the planning phase for pursuing sustainable development. However, there were only some sketchy steps focusing on policy assessment in the system of Taiwan. This study aims to develop a methodology for SEA in Taiwan to enhance the effectiveness associated with PPPs. The proposed methodology comprises an SEA procedure involving PPP management and assessment in various phases, a sustainable assessment framework, and an SEA management system. The SEA procedure is devised based on the theoretical considerations by systems thinking and the regulative requirements in Taiwan. The positive and negative impacts on ecology, society, and economy are simultaneously considered in the planning (including policy generation and evaluation), implementation, and control phases of the procedure. This study used the analytic hierarchy process, Delphi technique, and systems analysis to develop a sustainable assessment framework. An SEA management system was built based on geographic information system software to process spatial, attribute, and satellite image data during the assessment procedure. The proposed methodology was applied in the SEA of golf course installation policy in 2001 as a case study, which was the first SEA in Taiwan. Most of the 82 existing golf courses in 2001 were installed on slope lands and caused a serious ecological impact. Assessment results indicated that 15 future golf courses installed on marginal lands (including buffer zones, remedied lands, and wastelands) were acceptable because the comprehensive environmental (ecological, social, and economic) assessment value was better based on environmental characteristics and management regulations of Taiwan. The SEA procedure in the planning phase for this policy was completed but the implementation phase of this policy was not begun because the related legislation procedure could not be arranged due to a few senators' resistance. A self-review of the control phase was carried out in 2006 using this methodology. Installation permits for 12 courses on slope lands were terminated after 2001 and then 27 future courses could be installed on marginal lands. The assessment value of this policy using the data on ecological, social, and economic conditions from 2006 was higher than that using the data from 2001. The analytical results illustrate that the proposed methodology can be used to effectively and efficiently assist the related authorities for SEA.

  7. Armored Family of Vehicles (AFV) Automation and Communication. Resource Management Plan (ACRMP). Phase 1. Volume 15.

    DTIC Science & Technology

    1987-09-01

    The AFV ACRMP is the Task Force Director’s (08) tool to manage command, control, communication (C3) automation system life cycle developments for the...responsibilities, development management, acquisition strategy, testing , life cycle support, technology assessment and work group relationships. ACRMP

  8. The SIMRAND methodology - Simulation of Research and Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  9. Personnel launch system autoland development study

    NASA Technical Reports Server (NTRS)

    Bossi, J. A.; Langehough, M. A.; Tollefson, J. C.

    1991-01-01

    The Personnel Launch System (PLS) Autoland Development Study focused on development of the guidance and control system for the approach and landing (A/L) phase and the terminal area energy management (TAEM) phase. In the A/L phase, a straight-in trajectory profile was developed with an initial high glide slope, a pull-up and flare to lower glide slope, and the final flare touchdown. The TAEM system consisted of using a heading alignment cone spiral profile. The PLS autopilot was developed using integral LQG design techniques. The guidance and control design was verified using a nonlinear 6 DOF simulation. Simulation results demonstrated accurate steering during the TAEM phase and adequate autoland performance in the presence of wind turbulence and wind shear.

  10. A Science Plan for a Comprehensive Regional Assessment of the Atlantic Coastal Plain Aquifer System in Maryland

    USGS Publications Warehouse

    Shedlock, Robert J.; Bolton, David W.; Cleaves, Emery T.; Gerhart, James M.; Nardi, Mark R.

    2007-01-01

    The Maryland Coastal Plain region is, at present, largely dependent upon ground water for its water supply. Decades of increasing pumpage have caused ground-water levels in parts of the Maryland Coastal Plain to decline by as much as 2 feet per year in some areas of southern Maryland. Continued declines at this rate could affect the long-term sustainability of ground-water resources in Maryland's heavily populated Coastal Plain communities and the agricultural industry of the Eastern Shore. In response to a recommendation in 2004 by the Advisory Committee on the Management and Protection of the State's Water Resources, the Maryland Geological Survey and the U.S. Geological Survey have developed a science plan for a comprehensive assessment that will provide new scientific information and new data management and analysis tools for the State to use in allocating ground water in the Coastal Plain. The comprehensive assessment has five goals aimed at improving the current information and tools used to understand the resource potential of the aquifer system: (1) document the geologic and hydrologic characteristics of the aquifer system in the Maryland Coastal Plain and appropriate areas of adjacent states; (2) conduct detailed studies of the regional ground-water-flow system and water budget for the aquifer system; (3) improve documentation of patterns of water quality in all Coastal Plain aquifers, including the distribution of saltwater; (4) enhance ground-water-level, streamflow, and water-quality-monitoring networks in the Maryland Coastal Plain; and (5) develop science-based tools to facilitate sound management of the ground-water resources in the Maryland Coastal Plain. The assessment, as designed, will be conducted in three phases and if fully implemented, is expected to take 7 to 8 years to complete. Phase I, which was initiated in January 2006, is an effort to assemble all the information and investigation tools needed to do a more comprehensive assessment of the aquifer system. The work will include updating the hydrogeologic framework, developing a Geographic Information System-based aquifer information system, refinement of water-use information, assessment of existing water-quality data, and development of detailed plans for ground-water-flow and management models. Phase II is an intensive study phase during which a regional ground-water-flow model will be developed and calibrated for the entire region of Maryland in the Atlantic Coastal Plain as well as appropriate areas of Delaware and Virginia. The model will be used to simulate flow and water levels in the aquifer system and to study the water budget of the system. The model analysis will be based on published information but will be supplemented with field investigations of recharge and leakage in the aquifer system. Localized and finely discretized ground-water-flow models that are embedded in the regional model will be developed for selected areas of heavy withdrawals. Other modeling studies will be conducted to better understand flow in the unconfined parts of the aquifer system and to support the recharge studies. Phase II will also include selected water-quality studies and a study to determine how hydrologic and water-quality-monitoring networks need to be enhanced to appropriately assess the sustainability of the Coastal Plain aquifer system. Phase III will be largely devoted to the development and application of a ground-water optimization model. This model will be linked to the ground-water-flow model to create a model package that can be used to test different water-management scenarios. The management criteria that will be used to develop these scenarios will be determined in consultation with a variety of state and local stakeholders and policy makers in Phases I and II of the assessment. The development of the aquifer information system is a key component of the assessment. The system will store all relevant aquifer data

  11. CIMS: The Cartographic Information Management System,

    DTIC Science & Technology

    1981-01-01

    information , composites of overlays to demonstrate the decision-making possibilities and slides of the cadastral sheet. System Use After data base ...create a national soils data base that can be used in managing the soil (Johnson, 1979). Small-scale information systems can be used in planning the...maps/charts over the base map, etc.). An example of the manual phase to be found in the literature is the Overlay Information System used in Prince

  12. Design and simulation of a lithium-ion battery with a phase change material thermal management system for an electric scooter

    NASA Astrophysics Data System (ADS)

    Khateeb, Siddique A.; Farid, Mohammed M.; Selman, J. Robert; Al-Hallaj, Said

    A lithium-ion battery employing a novel phase change material (PCM) thermal management system was designed for an electric scooter. Passive thermal management systems using PCM can control the temperature excursions and maintain temperature uniformity in Li-ion batteries without the use of active cooling components such as a fan, a blower or a pump found in air/liquid-cooling systems. Hence, the advantages of a compact, lightweight, and energy efficient system can be achieved with this novel form of thermal management system. Simulation results are shown for a Li-ion battery sub-module consisting of nine 18650 Li-ion cells surrounded by PCM with a melting point between 41 and 44 °C. The use of aluminum foam within the PCM and fins attached to the battery module were studied to overcome the low thermal conductivity of the PCM and the low natural convection heat transfer coefficient. The comparative results of the PCM performance in the presence of Al-foam and Al-fins are shown. The battery module is also simulated for summer and winter conditions. The effect of air-cooling on the Li-ion battery was also studied. These simulation results demonstrate the successful use of the PCM as a potential candidate for thermal management solution in electric scooter applications and therefore for other electric vehicle applications.

  13. Spacesuit Data Display and Management System

    NASA Technical Reports Server (NTRS)

    Hall, David G.; Sells, Aaron; Shah, Hemal

    2009-01-01

    A prototype embedded avionics system has been designed for the next generation of NASA extra-vehicular-activity (EVA) spacesuits. The system performs biomedical and other sensor monitoring, image capture, data display, and data transmission. An existing NASA Phase I and II award winning design for an embedded computing system (ZIN vMetrics - BioWATCH) has been modified. The unit has a reliable, compact form factor with flexible packaging options. These innovations are significant, because current state-of-the-art EVA spacesuits do not provide capability for data displays or embedded data acquisition and management. The Phase 1 effort achieved Technology Readiness Level 4 (high fidelity breadboard demonstration). The breadboard uses a commercial-grade field-programmable gate array (FPGA) with embedded processor core that can be upgraded to a space-rated device for future revisions.

  14. Incident management under SCAT adaptive control system : FAST-TRAC phase III deliverable. #11, Final report on incident management under SCATS adaptive control system

    DOT National Transportation Integrated Search

    1998-04-01

    The report documents the results of a study designed to test the effectiveness of ATMS and ATIS strategies to reduce delay resulting from an incident. The study had two main sections: a simulation study to test the effectiveness of several control st...

  15. Use of the recreation opportunity planning system to inventory recreation opportunities of arid lands

    Treesearch

    Perry J. Brown; B. L. Driver; Joseph K. Berry

    1981-01-01

    Recreation opportunity planning, which is being adopted by some land management agencies for recreation input to land management planning, is reviewed for its applicability to arid land situations. Particular attention is given to the inventory and analysis phases of the system and to what we have learned about its implementation during its development.

  16. Validation of Technical Recommendations. Final Report. ISSOE Managing Student Progress.

    ERIC Educational Resources Information Center

    Ridley, Dennis; And Others

    This report is organized to provide a complete, logical presentation of the major steps taken in the third phase of research on dynamics of dissemination of the Instructional Support System for Occupational Education (ISSOE). It reports on the confirmation and validation of the Phase II Final Report on Dissemination Issues and the Phase III…

  17. The Use of Invisalign® System in the Management of the Orthodontic Treatment before and after Class III Surgical Approach

    PubMed Central

    2016-01-01

    The approach to skeletal dysmorphisms in the maxillofacial area usually requires an orthodontic treatment by means of fixed appliances, both before and after the surgical phase. Since its introduction, Invisalign system has become a popular treatment choice for the clinicians because of the aesthetics and comfort of the removable clear aligners compared with the traditional appliances. Therefore, the aim of the present report was to illustrate the management of a malocclusion by means of Invisalign system associated with the traditional surgical technique. The present paper shows a case of a 23-year-old male patient characterized by a Class III malocclusion with lateral deviation of the mandible to the left side and cross-bite on teeth 2.2, 2.3, and 2.4. Invisalign system was used during the pre- and postsurgical phases rather than fixed appliances. The posttreatment cephalometric analysis emphasized the stability of the dental and skeletal symmetry corrections, occlusion and functional balance, over a 6-year follow-up. The results achieved at the end of the treatment showed how Invisalign can be effective in the management of the orthodontic phases in orthognathic surgery. The follow-up after 6 years emphasizes the stability of the treatment over time. PMID:27429811

  18. Payload operations control center network (POCCNET) systems definition phase study report

    NASA Technical Reports Server (NTRS)

    Desjardins, R.

    1978-01-01

    The results of the studies performed during the systems definition phase of POCCNET are presented. The concept of POCCNET as a system of standard POCCs is described and an analysis of system requirements is also included. Alternative systems concepts were evaluated as well as various methods for development of reliable reusable software. A number of POCC application areas, such as command management, on board computer support, and simulation were also studied. Other areas of investigation included the operation of POCCNET systems, the facility requirements and usage.

  19. Tracking and data systems support for the Helios project. Volume 1: Project development through end of mission, phase 2

    NASA Technical Reports Server (NTRS)

    Goodwin, P. S.; Traxler, M. R.; Meeks, W. G.; Flanagan, F. M.

    1976-01-01

    The overall evolution of the Helios Project is summarized from its conception through to the completion of the Helios-1 mission phase 2. Beginning with the project objectives and concluding with the Helios-1 spacecraft entering its first superior conjunction (end of mission phase 2), descriptions of the project, the mission and its phases, international management and interfaces, and Deep Space Network-spacecraft engineering development in telemetry, tracking, and command systems to ensure compatibility between the U.S. Deep Space Network and the German-built spacecraft are included.

  20. Investment portfolio management from cybernetic point of view

    NASA Astrophysics Data System (ADS)

    Marchev, Angel, Jr.; Marchev, Angel

    2013-12-01

    The theory of investment portfolios is a well defined component of financial science. While sound in principle, it faces some setbacks in its real-world implementation. In this paper the authors propose a reformulation of the investment portfolio problem as a cybernetic system where the Investor is the controlling system and the portfolio is the controlled system. Also the portfolio controlling process should be dissected in several ordered phases, so that each phase is represented as a subsystem within the structure of the controlling system Investor.

  1. Implementation research: a mentoring programme to improve laboratory quality in Cambodia

    PubMed Central

    Voeurng, Vireak; Sek, Sophat; Song, Sophanna; Vong, Nora; Tous, Chansamrach; Flandin, Jean-Frederic; Confer, Deborah; Costa, Alexandre; Martin, Robert

    2016-01-01

    Abstract Objective To implement a mentored laboratory quality stepwise implementation (LQSI) programme to strengthen the quality and capacity of Cambodian hospital laboratories. Methods We recruited four laboratory technicians to be mentors and trained them in mentoring skills, laboratory quality management practices and international standard organization (ISO) 15189 requirements for medical laboratories. Separately, we trained staff from 12 referral hospital laboratories in laboratory quality management systems followed by tri-weekly in-person mentoring on quality management systems implementation using the LQSI tool, which is aligned with the ISO 15189 standard. The tool was adapted from a web-based resource into a software-based spreadsheet checklist, which includes a detailed action plan and can be used to qualitatively monitor each laboratory’s progress. The tool – translated into Khmer – included a set of quality improvement activities grouped into four phases for implementation with increasing complexity. Project staff reviewed the laboratories’ progress and challenges in weekly conference calls and bi-monthly meetings with focal points of the health ministry, participating laboratories and local partners. We present the achievements in implementation from September 2014 to March 2016. Findings As of March 2016, the 12 laboratories have completed 74–90% of the 104 activities in phase 1, 53–78% of the 178 activities in phase 2, and 18–26% of the 129 activities in phase 3. Conclusion Regular on-site mentoring of laboratories using a detailed action plan in the local language allows staff to learn concepts of quality management system and learn on the job without disruption to laboratory service provision. PMID:27843164

  2. Perennial crop phase effects on soil fertility

    USDA-ARS?s Scientific Manuscript database

    There is a need to develop agricultural management systems that enhance soil fertility and reduce reliance on external inputs. Perennial phases in crop rotations are effective at restoring soil fertility, though little information exists in the northern Great Plains regarding soil-based outcomes re...

  3. South Lake Tahoe Coordinated Transit System project : phase III evaluation report

    DOT National Transportation Integrated Search

    2000-03-01

    Utah's basic highway information system is one of the most complete data base management systems found in any of the Highway Safety Information System (HSIS) States in terms of the number of files included in the system and the flexibility of output....

  4. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  5. Methods Used to Support a Life Cycle of Complex Engineering Products

    NASA Astrophysics Data System (ADS)

    Zakharova, Alexandra A.; Kolegova, Olga A.; Nekrasova, Maria E.; Eremenko, Andrey O.

    2016-08-01

    Management of companies involved in the design, development and operation of complex engineering products recognize the relevance of creating systems for product lifecycle management. A system of methods is proposed to support life cycles of complex engineering products, based on fuzzy set theory and hierarchical analysis. The system of methods serves to demonstrate the grounds for making strategic decisions in an environment of uncertainty, allows the use of expert knowledge, and provides interconnection of decisions at all phases of strategic management and all stages of a complex engineering product lifecycle.

  6. Common Ada Missile Packages. Phase 2. (CAMP-2). Volume 2. 11th Missile Demonstration

    DTIC Science & Technology

    1988-11-01

    report describes the work performed, Ihe results obtained, and the conclusions reached during the Common Ada Missile Packages Phase-2 (CAMP-2) contract ... contract was performed between Sep- tember 1985. and March 1988. The MDAC-STL CAMP program manager was: Dr. Daniel G. McNicholl Technology Branch...j DEC Code Management System X X Software Development Files x x Development Status Database x ! X i Smart Cade Counter X j

  7. Energy management installation at North Middlesex Hospital.

    PubMed

    Hart, V A

    1986-05-01

    The author is the Energy Conservation Officer for the Haringey Health Authority. The North Middlesex Hospital is an acute unit with approximately 700 beds. Currently, twenty-one outstations control the maternity/radio therapy tower complex plus the outpatients' department. Plans have been approved to extend the system and Phase 2 will cover pathology, administration, medical and surgical blocks together with x-ray and casualty blocks. Transmitton Ltd, as in Phase 1, will supply the hardware and contract management.

  8. Microencapsulated Phase-Change Materials For Storage Of Heat

    NASA Technical Reports Server (NTRS)

    Colvin, David P.

    1989-01-01

    Report describes research on engineering issues related to storage and transport of heat in slurries containing phase-change materials in microscopic capsules. Specific goal of project to develop lightweight, compact, heat-management systems used safely in inhabited areas of spacecraft. Further development of obvious potential of technology expected to lead to commercialization and use in aircraft, electronic equipment, machinery, industrial processes, and other sytems in which requirements for management of heat compete with severe restrictions on weight or volume.

  9. Multiperiod planning tool for multisite pig production systems.

    PubMed

    Nadal-Roig, E; Plà, L M

    2014-09-01

    This paper presents a multiperiod planning tool for multisite pig production systems based on Linear Programming (LP). The aim of the model is to help pig managers of multisite systems in making short-term decisions (mainly related to pig transfers between farms and batch management in fattening units) and mid-term or long-term decisions (according to company targets and expansion strategy). The model skeleton follows the structure of a three-site system that can be adapted to any multisite system present in the modern pig industry. There are three basic phases, namely, piglet production, rearing pigs, and fattening. Each phase involves a different set of farms; therefore, transportation between farms and delivering of pigs to the abattoir are under consideration. The model maximizes the total gross margin calculated from the income of sales to the abattoir and the production costs over the time horizon considered. Production cost depends on each type of farm involved in the process. Parameters like number of farms per phase and distance, farm capacity, reproduction management policies, feeding and veterinary expenses, and transportation costs are taken into account. The model also provides a schedule of transfers between farms in terms of animals to be transported and number of trucks involved. The use of the model is illustrated with a case study based on a real instance of a company located in Catalonia (Spain).

  10. Principles of hospital disaster management: an integrated and multidisciplinary approach.

    PubMed

    Hendrickx, C; Hoker, S D; Michiels, G; Sabbe, M B

    Principles of hospital disaster management: an integrated and multidisciplinary approach. Hospitals play an important role during a disaster response, and are also at risk for internal incidents. We propose an integrated and multidisciplinary approach towards hospital disaster management and preparedness. In addition to response strategies, much attention is given to risk assessment and preparedness in the pre-incident phase and to business continuity planning (BCP) in the post-incident phase. It is essential to train key players and all personnel to understand the Hospital Incident Management System (HIMS) and to perform specific emergency procedures. All emergency procedures should be grounded in evidence-based practice resulting from essential disaster response research.

  11. Design of Training Systems, Phase II Report, Volume III; Model Program Descriptions and Operating Procedures. TAEG Report No. 12-2.

    ERIC Educational Resources Information Center

    Naval Training Equipment Center, Orlando, FL. Training Analysis and Evaluation Group.

    The Design of Training Systems (DOTS) project was initiated by the Department of Defense (DOD) to develop tools for the effective management of military training organizations. Volume 3 contains the model and data base program descriptions and operating procedures designed for phase 2 of the project. Flow charts and program listings for the…

  12. CASSINI. Report on the Phase A study: Saturn Orbiter and Titan probe

    NASA Technical Reports Server (NTRS)

    1988-01-01

    An in-depth, second phase exploration of Saturn is proposed. The scientific objectives involving Titan, Saturn's rings, icy satellites, magnetosphere, Jupiter, asteroids, and cruise science are covered. Other topics presented include: (1) the model payloads; (2) project requirements; (3) mission; (4) launch vehicle; (5) the orbiter system; (6) the Titan probe system; (7) mission operations; (8) management; and (9) development plan.

  13. Combat Agility Management System (CAMS)

    NASA Technical Reports Server (NTRS)

    Skow, Andrew; Porada, William

    1994-01-01

    The proper management of energy becomes a complex task in fighter aircraft which have high angle of attack (AOA) capability. Maneuvers at high AOA are accompanied by high bleed rates (velocity decrease), a characteristic that is usually undesirable in a typical combat arena. Eidetics has developed under NASA SBIR Phase 1 and NAVAIR SBIR Phase 2 contracts a system which allows a pilot to more easily and effectively manage the trade-off of energy (airspeed or altitude) for turn rate while not imposing hard limits on the high AOA nose pointing capability that can be so important in certain air combat maneuver situations. This has been accomplished by incorporating a two-stage angle of attack limiter into the flight control laws. The first stage sets a limit on AOA to achieve a limit on the maximum bleed rate (selectable) by limiting AOA to values which are dependent on the aircraft attitude and dynamic pressure (or flight path, velocity, and altitude). The second stage sets an AOA limit near the AOA for C(sub l max). One of the principal benefits of such a system is that it enables a low-experience pilot to become much more proficient at managing his energy. The Phase 2 simulation work is complete, and an exploratory flight test on the F-18 HARV is planned for the Fall of 1994 to demonstrate/validate the concept.

  14. Microgravity Fluid Separation Physics: Experimental and Analytical Results

    NASA Technical Reports Server (NTRS)

    Shoemaker, J. Michael; Schrage, Dean S.

    1997-01-01

    Effective, low power, two-phase separation systems are vital for the cost-effective study and utilization of two-phase flow systems and flow physics of two-phase flows. The study of microgravity flows have the potential to reveal significant insight into the controlling mechanisms for the behavior of flows in both normal and reduced gravity environments. The microgravity environment results in a reduction in gravity induced buoyancy forces acting on the discrete phases. Thus, surface tension, viscous, and inertial forces exert an increased influence on the behavior of the flow as demonstrated by the axisymmetric flow patterns. Several space technology and operations groups have studied the flow behavior in reduced gravity since gas-liquid flows are encountered in several systems such as cabin humidity control, wastewater treatment, thermal management, and Rankine power systems.

  15. Data Management Standards in Computer-aided Acquisition and Logistic Support (CALS)

    NASA Technical Reports Server (NTRS)

    Jefferson, David K.

    1990-01-01

    Viewgraphs and discussion on data management standards in computer-aided acquisition and logistic support (CALS) are presented. CALS is intended to reduce cost, increase quality, and improve timeliness of weapon system acquisition and support by greatly improving the flow of technical information. The phase 2 standards, industrial environment, are discussed. The information resource dictionary system (IRDS) is described.

  16. An on-line image data base system: Managing image collections

    Treesearch

    Malchus B. Baker; Daniel P. Huebner; Peter F. Ffolliott

    2000-01-01

    Many researchers and land management personnel want photographic records of the phases of their studies or projects. Depending on the personnel and the type of project, a study can result in a few or hundreds of photographic images. A data base system allows users to query using various parameters, such as key words, dates, and project locations, and to view images...

  17. Use of imagery and GIS for humanitarian demining management

    NASA Astrophysics Data System (ADS)

    Gentile, Jack; Gustafson, Glen C.; Kimsey, Mary; Kraenzle, Helmut; Wilson, James; Wright, Stephen

    1997-11-01

    In the Fall of 1996, the Center for Geographic Information Science at James Madison University became involved in a project for the Department of Defense evaluating the data needs and data management systems for humanitarian demining in the Third World. In particular, the effort focused on the information needs of demining in Cambodia and in Bosnia. In the first phase of the project one team attempted to identify all sources of unclassified country data, image data and map data. Parallel with this, another group collected information and evaluations on most of the commercial off-the-shelf computer software packages for the management of such geographic information. The result was a design for the kinds of data and the kinds of systems necessary to establish and maintain such a database as a humanitarian demining management tool. The second phase of the work involved acquiring the recommended data and systems, integrating the two, and producing a demonstration of the system. In general, the configuration involves ruggedized portable computers for field use with a greatly simplified graphical user interface, supported by a more capable central facility based on Pentium workstations and appropriate technical expertise.

  18. [Road map for health and safety management systems in healthcare facilities, according to the OHSAS 18001:2007 standard].

    PubMed

    Pugliese, F; Albini, E; Serio, O; Apostoli, P

    2011-01-01

    The 81/2008 Act has defined a model of a health and safety management system that can contribute to prevent the occupational health and safety risks. We have developed the structure of a health and safety management system model and the necessary tools for its implementation in health care facilities. The realization of a model is structured in various phases: initial review, safety policy, planning, implementation, monitoring, management review and continuous improvement. Such a model, in continuous evolution, is based on the responsibilities of the different corporate characters and on an accurate analysis of risks and involved norms.

  19. A uniform transit safety records system for the Commonwealth of Virginia.

    DOT National Transportation Integrated Search

    1981-01-01

    This study was conceived as the first phase of a three-phase program to develop a safety data base for intracity bus transit. It involved reviewing the state of the art of general transportation safety management, examining the current intracity bus ...

  20. Phase fluctuation spectra: New radio science information to become available in the DSN tracking system Mark III-77

    NASA Technical Reports Server (NTRS)

    Berman, A. L.

    1977-01-01

    An algorithm was developed for the continuous and automatic computation of Doppler noise concurrently at four sample rate intervals, evenly spanning three orders of magnitude. Average temporal Doppler phase fluctuation spectra will be routinely available in the DSN tracking system Mark III-77 and require little additional processing. The basic (noise) data will be extracted from the archival tracking data file (ATDF) of the tracking data management system.

  1. Phase III Autotrack : integrated CCTV.

    DOT National Transportation Integrated Search

    2005-01-01

    The Virginia Department of Transportation (VDOT) has invested in extensive closed circuit television (CCTV) systems to monitor freeways in urban areas. Generally, these devices are installed as part of freeway management systems (Smart Traffic Center...

  2. Construction Management Activities of Governmental Agencies in the New England Area During the Construction Phase.

    DTIC Science & Technology

    1980-02-01

    automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined

  3. Mars transit vehicle thermal protection system: Issues, options, and trades

    NASA Technical Reports Server (NTRS)

    Brown, Norman

    1986-01-01

    A Mars mission is characterized by different mission phases. The thermal control of cryogenic propellant in a propulsive vehicle must withstand the different mission environments. Long term cryogenic storage may be achieved by passive or active systems. Passive cryo boiloff management features will include multilayer insulation, vapor cooled shield, and low conductance structural supports and penetrations. Active boiloff management incorporates the use of a refrigeration system. Key system trade areas include active verses passive system boiloff management (with respect to safety, reliability, and cost) and propellant tank insulation optimizations. Technology requirements include refrigeration technology advancements, insulation performance during long exposure, and cryogenic fluid transfer system for mission vehicle propellant tanking during vehicle buildip in LEO.

  4. Coordinated single-phase control scheme for voltage unbalance reduction in low voltage network.

    PubMed

    Pullaguram, Deepak; Mishra, Sukumar; Senroy, Nilanjan

    2017-08-13

    Low voltage (LV) distribution systems are typically unbalanced in nature due to unbalanced loading and unsymmetrical line configuration. This situation is further aggravated by single-phase power injections. A coordinated control scheme is proposed for single-phase sources, to reduce voltage unbalance. A consensus-based coordination is achieved using a multi-agent system, where each agent estimates the averaged global voltage and current magnitudes of individual phases in the LV network. These estimated values are used to modify the reference power of individual single-phase sources, to ensure system-wide balanced voltages and proper power sharing among sources connected to the same phase. Further, the high X / R ratio of the filter, used in the inverter of the single-phase source, enables control of reactive power, to minimize voltage unbalance locally. The proposed scheme is validated by simulating a LV distribution network with multiple single-phase sources subjected to various perturbations.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  5. The Recreational Pilot Practical Test Standard for Powered Parachute

    DOT National Transportation Integrated Search

    1997-06-01

    The I-4 Surveillance and Motorist Information System (SMIS) in the Orlando metropolitan area is Florida's largest existing Freeway Management System (FMS). This system was initially installed in 1991 (Phase I) to help support the TravTek ITS Operatio...

  6. Developing Mobile BIM/2D Barcode-Based Automated Facility Management System

    PubMed Central

    Chen, Yen-Pei

    2014-01-01

    Facility management (FM) has become an important topic in research on the operation and maintenance phase. Managing the work of FM effectively is extremely difficult owing to the variety of environments. One of the difficulties is the performance of two-dimensional (2D) graphics when depicting facilities. Building information modeling (BIM) uses precise geometry and relevant data to support the facilities depicted in three-dimensional (3D) object-oriented computer-aided design (CAD). This paper proposes a new and practical methodology with application to FM that uses an integrated 2D barcode and the BIM approach. Using 2D barcode and BIM technologies, this study proposes a mobile automated BIM-based facility management (BIMFM) system for FM staff in the operation and maintenance phase. The mobile automated BIMFM system is then applied in a selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FM practice. The combined results demonstrate that a BIMFM-like system can be an effective mobile automated FM tool. The advantage of the mobile automated BIMFM system lies not only in improving FM work efficiency for the FM staff but also in facilitating FM updates and transfers in the BIM environment. PMID:25250373

  7. Developing mobile BIM/2D barcode-based automated facility management system.

    PubMed

    Lin, Yu-Cheng; Su, Yu-Chih; Chen, Yen-Pei

    2014-01-01

    Facility management (FM) has become an important topic in research on the operation and maintenance phase. Managing the work of FM effectively is extremely difficult owing to the variety of environments. One of the difficulties is the performance of two-dimensional (2D) graphics when depicting facilities. Building information modeling (BIM) uses precise geometry and relevant data to support the facilities depicted in three-dimensional (3D) object-oriented computer-aided design (CAD). This paper proposes a new and practical methodology with application to FM that uses an integrated 2D barcode and the BIM approach. Using 2D barcode and BIM technologies, this study proposes a mobile automated BIM-based facility management (BIMFM) system for FM staff in the operation and maintenance phase. The mobile automated BIMFM system is then applied in a selected case study of a commercial building project in Taiwan to verify the proposed methodology and demonstrate its effectiveness in FM practice. The combined results demonstrate that a BIMFM-like system can be an effective mobile automated FM tool. The advantage of the mobile automated BIMFM system lies not only in improving FM work efficiency for the FM staff but also in facilitating FM updates and transfers in the BIM environment.

  8. Access management research and awareness program : phase IV final report

    DOT National Transportation Integrated Search

    1999-11-01

    Access management involves balancing the dual roles that roadways must play - through travel and access to property and economic activity. When these roles are not in proper balance, the result is a roadway system that functions sub-optimally. The Io...

  9. The Development of the Multi-Center Traffic Management Advisor (MCTMA): Traffic Flow Management Research in a Multi-Facility Environment

    NASA Technical Reports Server (NTRS)

    Lee, Katharine K.; Davis, Thomas J.; Levin, Kerry M.; Rowe, Dennis W.

    2001-01-01

    The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.

  10. Problem reporting management system performance simulation

    NASA Technical Reports Server (NTRS)

    Vannatta, David S.

    1993-01-01

    This paper proposes the Problem Reporting Management System (PRMS) model as an effective discrete simulation tool that determines the risks involved during the development phase of a Trouble Tracking Reporting Data Base replacement system. The model considers the type of equipment and networks which will be used in the replacement system as well as varying user loads, size of the database, and expected operational availability. The paper discusses the dynamics, stability, and application of the PRMS and addresses suggested concepts to enhance the service performance and enrich them.

  11. [Risk management project: reactive or proactive approach?].

    PubMed

    Vastola, Pasquale; Saracino, Donato M T

    2006-01-01

    Risk management in healthcare refers to the process of developing strategies aimed at preventing and controlling the risk of occurrence of errors and harmful events. The final objective is primarily that of increasing patient safety and secondarily, that of reducing the financial burden of adverse events. The implementation of a risk management system is therefore of vital strategic importance. Nevertheless, a fundamental question that needs to be answered in the operational phase is: should a proactive or reactive approach to risk management be taken? In our view, proactive risk management has many advantages over a reactive approach and is therefore preferable. The reactive approach should be taken exclusively to obtain information regarding risk and errors, in the preliminary, as well as monitoring and follow-up phases of the project.

  12. Cost effectiveness of adopted quality requirements in hospital laboratories.

    PubMed

    Hamza, Alneil; Ahmed-Abakur, Eltayib; Abugroun, Elsir; Bakhit, Siham; Holi, Mohamed

    2013-01-01

    The present study was designed in quasi-experiment to assess adoption of the essential clauses of particular clinical laboratory quality management requirements based on international organization for standardization (ISO 15189) in hospital laboratories and to evaluate the cost effectiveness of compliance to ISO 15189. The quality management intervention based on ISO 15189 was conceded through three phases; pre - intervention phase, Intervention phase and Post-intervention phase. In pre-intervention phase the compliance to ISO 15189 was 49% for study group vs. 47% for control group with P value 0.48, while the post intervention results displayed 54% vs. 79% for study group and control group respectively in compliance to ISO 15189 and statistically significant difference (P value 0.00) with effect size (Cohen's d) of (0.00) in pre-intervention phase and (0.99) in post - intervention phase. The annual average cost per-test for the study group and control group was 1.80 ± 0.25 vs. 1.97 ± 0.39, respectively with P value 0.39 whereas the post-intervention results showed that the annual average total costs per-test for study group and control group was 1.57 ± 0.23 vs 2.08 ± 0.38, P value 0.019 respectively, with cost-effectiveness ratio of (0.88) in pre -intervention phase and (0.52) in post-intervention phase. The planned adoption of quality management requirements (QMS) in clinical laboratories had great effect to increase the compliance percent with quality management system requirement, raise the average total cost effectiveness, and improve the analytical process capability of the testing procedure.

  13. Demonstration of digital phase-sensitive boosting to extend signal reach for long-haul WDM systems using optical phase-conjugated copy.

    PubMed

    Tian, Yue; Huang, Yue-Kai; Zhang, Shaoliang; Prucnal, Paul R; Wang, Ting

    2013-02-25

    We demonstrate a hybrid optical/digital phase-sensitive boosting (PSB) technique for long-haul wavelength division multiplexing (WDM) transmission systems. The approach uses four-wave mixing (FWM) to generate a phase-conjugated idler alongside the original signal. At the receiver, the signal and idler are jointly detected, and the phases of the idler symbols are conjugated and summed with the signal symbols to suppress noise and nonlinear phase distortion. The proposed hybrid PSB scheme is independent of modulation format and does not require an optical phase-locked loop to achieve phase matching required by conventional phase-sensitive amplifiers. Our simulation and experimental results of 112-Gb/s dual-polarization quadrature phase-shift-keying (DP-QPSK) transmission confirmed the principle of the PSB scheme, attaining a Q-factor improvement of 2.4 dB over conventional single-channel transmission after 4,800 km of dispersion-managed fiber (DMF) link at the expense of 50% reduction in spectral efficiency and extending the system reach by 60% to 7,680 km.

  14. Systems engineering and the user: Incorporation of user requirements into the SE process

    NASA Technical Reports Server (NTRS)

    Naugle, John E.

    1993-01-01

    This paper is organized into four parts. In the Gestation Phase, I describe the process of starting a new mission and establishing its rough boundaries. Next I show how the scientific experiments are selected. Then we enter the Preliminary Design Phase, where we incorporate the scientist's instruments into the systems engineering process. Finally, I show how the Preliminary Design Review (PDR) assures NASA management and the scientists that the scientific requirements have been incorporated into the systems engineering process to everyone's satisfaction.

  15. Analytical Optimization of the Net Residual Dispersion in SPM-Limited Dispersion-Managed Systems

    NASA Astrophysics Data System (ADS)

    Xiao, Xiaosheng; Gao, Shiming; Tian, Yu; Yang, Changxi

    2006-05-01

    Dispersion management is an effective technique to suppress the nonlinear impairment in fiber transmission systems, which includes tuning the amounts of precompensation, residual dispersion per span (RDPS), and net residual dispersion (NRD) of the systems. For self-phase modulation (SPM)-limited systems, optimizing the NRD is necessary because it can greatly improve the system performance. In this paper, an analytical method is presented to optimize NRD for SPM-limited dispersion-managed systems. The method is based on the correlation between the nonlinear impairment and the output pulse broadening of SPM-limited systems; therefore, dispersion-managed systems can be optimized through minimizing the output single-pulse broadening. A set of expressions is derived to calculate the output pulse broadening of the SPM-limited dispersion-managed system, from which the analytical result of optimal NRD is obtained. Furthermore, with the expressions of pulse broadening, how the nonlinear impairment depends on the amounts of precompensation and RDPS can be revealed conveniently.

  16. An Approach and Instrumentation for Management System Analysis

    DTIC Science & Technology

    1974-10-01

    Benefit Analysis Systems Analysis Manpower Planning Resource Planning Information Theory 20. ABSTRACT (Conlliwa on ravaraa alda It nacaaaary...participants the data necessary to trace both formal and informal information flows and make cost- benefit judgments about specific communications. The...network within a manage- ment structure and to provide a basis tor preliminary cost- benefit evaluations. This objective was in response to Phase I of the

  17. Power subsystem automation study

    NASA Technical Reports Server (NTRS)

    Tietz, J. C.; Sewy, D.; Pickering, C.; Sauers, R.

    1984-01-01

    The purpose of the phase 2 of the power subsystem automation study was to demonstrate the feasibility of using computer software to manage an aspect of the electrical power subsystem on a space station. The state of the art in expert systems software was investigated in this study. This effort resulted in the demonstration of prototype expert system software for managing one aspect of a simulated space station power subsystem.

  18. Phased-array radar for airborne systems

    NASA Astrophysics Data System (ADS)

    Tahim, Raghbir S.; Foshee, James J.; Chang, Kai

    2003-09-01

    Phased array antenna systems, which support high pulse rates and high transmit power, are well suited for radar and large-scale surveillance. Sensors and communication systems can function as the eyes and ears for ballistic missile defense applications, providing early warning of attack, target detection and identification, target tracking, and countermeasure decision. In such applications, active array radar systems that contain solid-state transmitter sources and low-noise preamplifiers for transmission and reception are preferred over the conventional radar antennas, because the phased array radar offers the advantages of power management and efficiency, reliability, signal reception, beam steering target detection. The current phased array radar designs are very large, complex and expensive and less efficient because of high RF losses in the phase control circuits used for beam scan. Several thousands of phase shifters and drivers may be required for a single system thus making the system very complex and expensive. This paper describes the phased array radar system based on high power T/R modules, wide-band radiating planar antenna elements and very low loss wide-band phase control circuits (requiring reduced power levels) for beam scan. The phase shifter design is based on micro-strip feed lines perturbed by the proximity of voltage controlled piezoelectric transducer (PET). Measured results have shown an added insertion loss of less than 1 dB for a phase shift of 450 degrees from 2 to 20 GHz. The new wideband phased array radar design provides significant reduction in size cost and weight. Compared to the conventional phased array systems, the cost saving is more than 15 to 1.

  19. Space station WP-04 power system. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Hallinan, G. J.

    1987-01-01

    Major study activities and results of the phase B study contract for the preliminary design of the space station Electrical Power System (EPS) are summarized. The areas addressed include the general system design, man-tended option, automation and robotics, evolutionary growth, software development environment, advanced development, customer accommodations, operations planning, product assurance, and design and development phase planning. The EPS consists of a combination photovoltaic and solar dynamic power generation subsystem and a power management and distribution (PMAD) subsystem. System trade studies and costing activities are also summarized.

  20. Tranzit XPress : hazardous material fleet management and monitoring system : evaluation report

    DOT National Transportation Integrated Search

    1997-07-01

    In this report the evaluation performed on the first phase of the Tranzit XPress system is presented. The system comprises of a traffic/safety control center, motor vehicle instrumentation, and a variety of off vehicle tools that communicate with eac...

  1. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2013-01-01

    Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks - not just risk office personnel. Each group/department is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk informed decision making should be introduced to all levels of management. ? Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  2. BEST PRACTICES TO SUPPORT AND IMPROVE PAVEMENT MANAGEMENT SYSTEMS FOR LOW-VOLUME PAVED ROADS – PHASE I

    DOT National Transportation Integrated Search

    2018-02-02

    The Colorado Department of Transportation (CDOT) has been trying to identify the most effective methods for managing low-volume roads (LVRs). These roads are facing multiple challenges including: reductions in maintenance budgets, impact of industria...

  3. Integrated corridor management initiative : demonstration phase evaluation, San Diego institutional and organizational analysis test plan.

    DOT National Transportation Integrated Search

    2003-03-01

    In March of 2001, the Federal Highway Administration (FHWA), in conjunction with the Federal Transit Administration (FTA), engaged Gannett Fleming, Inc., to develop the first ever Tunnel Management System to benefit both highway and rail transit tunn...

  4. An action plan for risk management in the Virginia Department of Transportation : final report.

    DOT National Transportation Integrated Search

    1991-01-01

    In part 3 of a three-phase effort, the Virginia Transportation Research Council was requested by the Virginia Department of Transportation (VDOT) to develop a comprehensive risk management system to confront the threat of tort liability caused by tra...

  5. Enhanced human service transportation models : joint demonstration. Phase 1, System planning and design process evaluation : baseline analysis

    DOT National Transportation Integrated Search

    2007-11-13

    This document presents the findings from the baseline phase of the evaluation of the process being used by eight sites to develop a design for a Travel Management Coordination Center (TMCC) for improved coordination of human service transportation wi...

  6. Mineral phases and metals in baghouse dust from secondary aluminum production

    EPA Science Inventory

    Baghouse dust (BHD) is a solid waste generated by air pollution control systems during secondary aluminum processing (SAP). Management and disposal of BHD can be challenging in the U.S. and elsewhere. In this study, the mineral phases, metal content and metal leachability of 78...

  7. On the Decision-Making Process in Music Education.

    ERIC Educational Resources Information Center

    Jorgensen, Estelle R.

    1985-01-01

    Sketches a conceptual framework for the systematic description of decision-making processes in music education. Refers to existing formulations in education, management, marketing, and economics. Lists decision-making phases in music education, each exhibiting the characteristics of a social system. Offers a historical example of each phase. (AYC)

  8. Evaluation of location and number of aid post for sustainable humanitarian relief using agent based modeling (ABM) and geographic information system (GIS)

    NASA Astrophysics Data System (ADS)

    Khair, Fauzi; Sopha, Bertha Maya

    2017-12-01

    One of the crucial phases in disaster management is the response phase or the emergency response phase. It requires a sustainable system and a well-integrated management system. Any errors in the system on this phase will impact on significant increase of the victims number as well as material damage caused. Policies related to the location of aid posts are important decisions. The facts show that there are many failures in the process of providing assistance to the refugees due to lack of preparation and determination of facilities and aid post location. Therefore, this study aims to evaluate the number and location of aid posts on Merapi eruption in 2010. This study uses an integration between Agent Based Modeling (ABM) and Geographic Information System (GIS) about evaluation of the number and location of the aid post using some scenarios. The ABM approach aims to describe the agents behaviour (refugees and volunteers) in the event of a disaster with their respective characteristics. While the spatial data, GIS useful to describe real condition of the Sleman regency road. Based on the simulation result, it shows alternative scenarios that combine DERU UGM post, Maguwoharjo Stadium, Tagana Post and Pakem Main Post has better result in handling and distributing aid to evacuation barrack compared to initial scenario. Alternative scenarios indicates the unmet demands are less than the initial scenario.

  9. Analytical expressions for the nonlinear interference in dispersion managed transmission coherent optical systems

    NASA Astrophysics Data System (ADS)

    Qiao, Yaojun; Li, Ming; Yang, Qiuhong; Xu, Yanfei; Ji, Yuefeng

    2015-01-01

    Closed-form expressions of nonlinear interference of dense wavelength-division-multiplexed (WDM) systems with dispersion managed transmission (DMT) are derived. We carry out a simulative validation by addressing an ample and significant set of the Nyquist-WDM systems based on polarization multiplexed quadrature phase-shift keying (PM-QPSK) subcarriers at a baud rate of 32 Gbaud per channel. Simulation results show the simple closed-form analytical expressions can provide an effective tool for the quick and accurate prediction of system performance in DMT coherent optical systems.

  10. Process-driven information management system at a biotech company: concept and implementation.

    PubMed

    Gobbi, Alberto; Funeriu, Sandra; Ioannou, John; Wang, Jinyi; Lee, Man-Ling; Palmer, Chris; Bamford, Bob; Hewitt, Robin

    2004-01-01

    While established pharmaceutical companies have chemical information systems in place to manage their compounds and the associated data, new startup companies need to implement these systems from scratch. Decisions made early in the design phase usually have long lasting effects on the expandability, maintenance effort, and costs associated with the information management system. Careful analysis of work and data flows, both inter- and intradepartmental, and identification of existing dependencies between activities are important. This knowledge is required to implement an information management system, which enables the research community to work efficiently by avoiding redundant registration and processing of data and by timely provision of the data whenever needed. This paper first presents the workflows existing at Anadys, then ARISE, the research information management system developed in-house at Anadys. ARISE was designed to support the preclinical drug discovery process and covers compound registration, analytical quality control, inventory management, high-throughput screening, lower throughput screening, and data reporting.

  11. Type 1 diabetes self-management: developing a web-based telemedicine application.

    PubMed

    Ayatollahi, Haleh; Hasannezhad, Mostafa; Fard, Hedieh Saneei; Haghighi, Mehran Kamkar

    2016-04-01

    Self-management skills are essential for patients with diabetes mellitus to minimise the risks of complications from their condition. The aim of this research was to develop a web-based application for self-management of type 1 diabetes, suitable for use by patients, their carers and physicians. The study was comprised of two phases, the first being analysis of the kind of information and capabilities required by potential users of the system. Based on the results derived from the first phase of the study, the system prototype was designed and then evaluated using the 'think aloud' method and a standard questionnaire. The application was designed for use by patients, their carers and physicians. Patients could enter the level of blood glucose, insulin and activities on a daily basis, and physicians were able to supervise a patient's health status from a distance. Users were generally satisfied with the final version of the system. People with a wide range of literacy skills were able to use the system effectively. Patients or their carers could use the web-based application as a log book by entering the level of blood glucose and insulin doses on a regular basis, and as an educational resource to improve self-management skills. Physicians could use the system at any time convenient to them to support patients by giving medical advice. Further research is needed to report the effectiveness of the system in practice.

  12. Fluor Daniel Hanford Inc. integrated safety management system phase 1 verification final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PARSONS, J.E.

    1999-10-28

    The purpose of this review is to verify the adequacy of documentation as submitted to the Approval Authority by Fluor Daniel Hanford, Inc. (FDH). This review is not only a review of the Integrated Safety Management System (ISMS) System Description documentation, but is also a review of the procedures, policies, and manuals of practice used to implement safety management in an environment of organizational restructuring. The FDH ISMS should support the Hanford Strategic Plan (DOE-RL 1996) to safely clean up and manage the site's legacy waste; deploy science and technology while incorporating the ISMS theme to ''Do work safely''; andmore » protect human health and the environment.« less

  13. Electronic construction collaboration system -- phase II.

    DOT National Transportation Integrated Search

    2010-06-01

    During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) : and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom d...

  14. Second Evaluation of Job Queuing/Scheduling Software. Phase 1

    NASA Technical Reports Server (NTRS)

    Jones, James Patton; Brickell, Cristy; Chancellor, Marisa (Technical Monitor)

    1997-01-01

    The recent proliferation of high performance workstations and the increased reliability of parallel systems have illustrated the need for robust job management systems to support parallel applications. To address this issue, NAS compiled a requirements checklist for job queuing/scheduling software. Next, NAS evaluated the leading job management system (JMS) software packages against the checklist. A year has now elapsed since the first comparison was published, and NAS has repeated the evaluation. This report describes this second evaluation, and presents the results of Phase 1: Capabilities versus Requirements. We show that JMS support for running parallel applications on clusters of workstations and parallel systems is still lacking, however, definite progress has been made by the vendors to correct the deficiencies. This report is supplemented by a WWW interface to the data collected, to aid other sites in extracting the evaluation information on specific requirements of interest.

  15. Experimental performances of a battery thermal management system using a phase change material

    NASA Astrophysics Data System (ADS)

    Hémery, Charles-Victor; Pra, Franck; Robin, Jean-François; Marty, Philippe

    2014-12-01

    Li-ion batteries are leading candidates for mobility because electric vehicles (EV) are an environmentally friendly mean of transport. With age, Li-ion cells show a more resistive behavior leading to extra heat generation. Another kind of problem called thermal runway arises when the cell is too hot, what happens in case of overcharge or short circuit. In order to evaluate the effect of these defects at the whole battery scale, an air-cooled battery module was built and tested, using electrical heaters instead of real cells for safety reasons. A battery thermal management system based on a phase change material is developed in that study. This passive system is coupled with an active liquid cooling system in order to initialize the battery temperature at the melting of the PCM. This initialization, or PCM solidification, can be performed during a charge for example, in other words when the energy from the network is available.

  16. Effects of an incinerator project on a healthcare-waste management system.

    PubMed

    Khammaneechan, Patthanasak; Okanurak, Kamolnetr; Sithisarankul, Pornchai; Tantrakarnapa, Kraichat; Norramit, Poonsup

    2011-10-01

    This evaluative research study aimed to assess the effects of the central healthcare incinerator project on waste management in Yala Province. The study data were collected twice: at baseline and during the operational phase. A combination of structured interview and observation were used during data collection. The study covered 127 healthcare facilities: government hospitals, healthcare centres, and private clinics. The results showed 63% of healthcare risk waste (HCRW) handlers attended the HCRW management training. Improvements in each stage of the HCRW management system were observed in all groups of facilities. The total cost of the HCRW management system did not change, however; the costs for hospitals decreased, whereas those for clinics increased significantly. It was concluded that the central healthcare waste incinerator project positively affected HCRW management in the area, although the costs of management might increase for a particular group. However, the benefits of changing to a more appropriately managed HCRW system will outweigh the increased costs.

  17. Operational Management of Area Environment.

    ERIC Educational Resources Information Center

    Sprague, George W.

    Three phases leading to the automation of the mechanical building systems on the Harvard campus are described. The systems allow a single operator to monitor and control all the mechanical systems, plus fire, flood, and security alarms, for all buildings in a large area of the campus. (JT)

  18. USDOT Guidance Summary for Connected Vehicle Deployments : System Requirements and the CVRIA/Set-It Tool : Final Report

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to System Requirements for the CV Pilots Deployment Concept Development Phase. Methods for system engineering are discussed with definitions for the successful management of each aspect. Important r...

  19. Cascaded Converters for Integration and Management of Grid Level Energy Storage Systems

    NASA Astrophysics Data System (ADS)

    Alaas, Zuhair

    This research work proposes two cascaded multilevel inverter structures for BESS. The gating and switching control of switching devices in both inverter typologies are done by using a phase-shifted PWM scheme. The first proposed isolated multilevel inverter is made up of three-phase six-switch inverter blocks with a reduced number of power components compared with traditional isolated CHB. The suggested isolated converter has only one battery string for three-phase system that can be used for high voltage and high power applications such as grid connected BESS and alternative energy systems. The isolated inverter enables dq frame based simple control and eliminates the issues of single-phase pulsating power, which can cause detrimental impacts on certain dc sources. Simulation studies have been carried out to compare the proposed isolated multi-level inverter with an H-bridge cascaded transformer inverter. The simulation results verified the performance of the isolated inverter. The second proposed topology is a Hierarchal Cascaded Multilevel Converter (HCMC) with phase to phase SOC balancing capability which also for high voltage and high power battery energy storage systems. The HCMC has a hybrid structure of half-bridge converters and H-bridge inverters and the voltage can be hierarchically cascaded to reach the desired value at the half-bridge and the H-bridge levels. The uniform SOC battery management is achieved by controlling the half-bridge converters that are connected to individual battery modules/cells. Simulation studies and experimental results have been carried on a large scale battery system under different operating conditions to verify the effectiveness of the proposed inverters. Moreover, this dissertation presents a new three-phase SOC equalizing circuit, called six-switch energy-level balancing circuit (SSBC), which can be used to realize uniform SOC operation for full utilization of the battery capacity in proposed HCMC or any CMI inverter while keeping balanced three-phase operation. A sinusoidal PWM modulation technique is used to control power transferring between phases. Simulation results have been carried out to verify the performance of the proposed SSBC circuit of uniform three-phase SOC balancing.

  20. Erosion Control and Environment Restoration Plan Development, Matagorda County, Texas. Phase 2. Preliminary Design

    DTIC Science & Technology

    2013-08-01

    recommended groin system. ......................... 37  Figure 23. H1% and Hs at the groin toe as a function of storm surge...phases of work. Keep in mind, the recommended groin system design will advance the shoreline; however, without dune and vegetation management, it...will not create a wider dry beach. Since the existing beach is presumably in equili- brium, the dune and vegetation will advance with the shoreline

  1. Space systems engineering and risk management - joined at the hip

    NASA Technical Reports Server (NTRS)

    Rose, James R.

    2004-01-01

    This paper explores the separate skills and capabilities practiced until now, and the powerful coupling to be achieved, practically and effectively, in implementing a space mission, from inception (pre-phase A) to the end of Operations (phase E). The use of risk assessment techniques in balancing cost risk against performance risk, and the application of the systems engineering team in these trades, is the key to achieving this new implementation paradigm.

  2. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  3. Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

    NASA Technical Reports Server (NTRS)

    Ging, Andrew; Engelland, Shawn; Capps, Al; Eshow, Michelle; Jung, Yoon; Sharma, Shivanjli; Talebi, Ehsan; Downs, Michael; Freedman, Cynthia; Ngo, Tyler; hide

    2018-01-01

    This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

  4. User systems guidelines for software projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abrahamson, L.

    1986-04-01

    This manual presents guidelines for software standards which were developed so that software project-development teams and management involved in approving the software could have a generalized view of all phases in the software production procedure and the steps involved in completing each phase. Guidelines are presented for six phases of software development: project definition, building a user interface, designing software, writing code, testing code, and preparing software documentation. The discussions for each phase include examples illustrating the recommended guidelines. 45 refs. (DWL)

  5. Annual Report in Support of Technical Development Plan 43-03X--Education and Training Development. Annual Report No. 4, November 11, 1972--November 15, 1973 on Phase 2.

    ERIC Educational Resources Information Center

    Marlowe, Edward; And Others

    This is the fourth report in a series which describes the results and progress in a long-term program to develop a Data Management System (DMS) and a Student Management System (SMS) for use in the Naval Student Pilot Training System. The DMS will contain all of the student naval aviator's data files needed to support an improved student training…

  6. Battery management systems with thermally integrated fire suppression

    DOEpatents

    Bandhauer, Todd M.; Farmer, Joseph C.

    2017-07-11

    A thermal management system is integral to a battery pack and/or individual cells. It relies on passive liquid-vapor phase change heat removal to provide enhanced thermal protection via rapid expulsion of inert high pressure refrigerant during abnormal abuse events and can be integrated with a cooling system that operates during normal operation. When a thermal runaway event occurs and sensed by either active or passive sensors, the high pressure refrigerant is preferentially ejected through strategically placed passages within the pack to rapidly quench the battery.

  7. Applying Risk Management to Reduce The Overall Time In Lay-Up While Increasing the Cost Effectiveness of a Nimitz (CVN 68) Class Aircraft Carrier in Dry Dock During the Execution Phase of a Refueling and Complex Overhaul

    DTIC Science & Technology

    2009-03-01

    operational availability and modernization capability. 15. NUMBER OF PAGES 137 14. SUBJECT TERMS Systems Engineering Process, Risk Management...MASTER OF SCIENCE IN SYSTEMS ENGINEERING from the NAVAL POSTGRADUATE SCHOOL March 2009 Author: Kiah Bernard Rahming Approved by...Professor Gary O. Langford Thesis Advisor Dr. Paul V. Shebalin Second Reader Dr. David H. Olwell Chairman, Department of Systems

  8. Smart sign enhancement, phase 2 : final report, September 2007.

    DOT National Transportation Integrated Search

    2007-09-01

    An on line ordering system, called Smart Sign Ordering System (SSOS), was : developed by The University of Akron for Ohio Department of Transportation (ODOT) : in 2004. Driven by the demand of managing planning, fabrication, packaging and : delivery,...

  9. Rework the workload.

    PubMed

    O'Bryan, Linda; Krueger, Janelle; Lusk, Ruth

    2002-03-01

    Kindred Healthcare, Inc., the nation's largest full-service network of long-term acute care hospitals, initiated a 3-year strategic plan to re-evaluate its workload management system. Here, follow the project's most important and difficult phase--designing and implementing the patient classification system.

  10. Alternate avionics system study and phase B extension

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Results of alternate avionics system studies for the space shuttle are presented that reduce the cost of vehicle avionics without incurring major off-setting costs on the ground. A comprehensive summary is provided of all configurations defined since the completion of the basic Phase B contract and a complete description of the optimized avionics baseline is given. In the new baseline, inflight redundancy management is performed onboard without ground support; utilization of off-the-shelf hardware reduces the cost figure substantially less than for the Phase B baseline. The only functional capability sacrificed in the new approach is automatic landing.

  11. Heterodyne detection using spectral line pairing for spectral phase encoding optical code division multiple access and dynamic dispersion compensation.

    PubMed

    Yang, Yi; Foster, Mark; Khurgin, Jacob B; Cooper, A Brinton

    2012-07-30

    A novel coherent optical code-division multiple access (OCDMA) scheme is proposed that uses spectral line pairing to generate signals suitable for heterodyne decoding. Both signal and local reference are transmitted via a single optical fiber and a simple balanced receiver performs sourceless heterodyne detection, canceling speckle noise and multiple-access interference (MAI). To validate the idea, a 16 user fully loaded phase encoded system is simulated. Effects of fiber dispersion on system performance are studied as well. Both second and third order dispersion management is achieved by using a spectral phase encoder to adjust phase shifts of spectral components at the optical network unit (ONU).

  12. Cost Effectiveness of Adopted Quality Requirements in Hospital Laboratories

    PubMed Central

    HAMZA, Alneil; AHMED-ABAKUR, Eltayib; ABUGROUN, Elsir; BAKHIT, Siham; HOLI, Mohamed

    2013-01-01

    Background The present study was designed in quasi-experiment to assess adoption of the essential clauses of particular clinical laboratory quality management requirements based on international organization for standardization (ISO 15189) in hospital laboratories and to evaluate the cost effectiveness of compliance to ISO 15189. Methods: The quality management intervention based on ISO 15189 was conceded through three phases; pre – intervention phase, Intervention phase and Post-intervention phase. Results: In pre-intervention phase the compliance to ISO 15189 was 49% for study group vs. 47% for control group with P value 0.48, while the post intervention results displayed 54% vs. 79% for study group and control group respectively in compliance to ISO 15189 and statistically significant difference (P value 0.00) with effect size (Cohen’s d) of (0.00) in pre-intervention phase and (0.99) in post – intervention phase. The annual average cost per-test for the study group and control group was 1.80 ± 0.25 vs. 1.97 ± 0.39, respectively with P value 0.39 whereas the post-intervention results showed that the annual average total costs per-test for study group and control group was 1.57 ± 0.23 vs 2.08 ± 0.38, P value 0.019 respectively, with cost-effectiveness ratio of (0.88) in pre -intervention phase and (0.52) in post-intervention phase. Conclusion: The planned adoption of quality management requirements (QMS) in clinical laboratories had great effect to increase the compliance percent with quality management system requirement, raise the average total cost effectiveness, and improve the analytical process capability of the testing procedure. PMID:23967422

  13. Energy management guidelines for rail transit systems : volume I. final report

    DOT National Transportation Integrated Search

    1986-09-01

    The cost of electricity is a significant portion of the operating costs of rail transit systems. The impact of increasing energy costs is felt by those systems presently in operation and will be felt by those in the planning or construction phases. B...

  14. Expert system for maintenance management of a boiling water reactor power plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hong Shen; Liou, L.W.; Levine, S.

    1992-01-01

    An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, whichmore » must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components.« less

  15. Oregon regional intelligent transportation systems (ITS) integration program. Final phase III report, I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project

    DOT National Transportation Integrated Search

    2005-07-01

    This report presents the results of the evaluation of the I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project, a cooperative project between the Oregon Department of Transportation (ODOT) and the City of Portland to integr...

  16. Demonstration of enhanced human service transportation models: phase 1 - system development and design : the purchase area regional travel management coordination center (TMCC).

    DOT National Transportation Integrated Search

    2009-03-23

    This report provides a comprehensive review of the policy, operational, and : technical design and development of the Purchase Area Transportation Management Coordination Center (TMCC) for : western Kentucky. The Purchase Area TMCC will facilitate si...

  17. SUSTAINABLE MANAGEMENT APPROACHES AND REVITALIZATION TOOLS-ELECTRONIC (SMARTE): OVERVIEW AND DEMONSTRATION FOR FINAL PHASE 3 CONFERENCE

    EPA Science Inventory

    The U.S. contingent of the U.S.-German Bilateral Working Group is developing Sustainable Management Approaches and Revitalization Tools-electronic (SMARTe). SMARTe is a web-based, decision support system designed to assist stakeholders in developing and evaluating alternative reu...

  18. Technical and Management Information System (TMIS)

    NASA Technical Reports Server (NTRS)

    Rau, Timothy R.

    1987-01-01

    The TMIS goals developed to support the Space Station Program (SSP) mission requirements are outlined. The TMIS will provide common capabilities to all SSP centers and facilitate the flow of technical and management information throughout the program as well as SSP decision-making processes. A summary is presented of the various TMIS phases.

  19. 78 FR 23194 - Federal Acquisition Regulation; Commercial and Government Entity Code

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ... Award Management Name Change, Phase 1 Implementation) which will make a global update to all of the... outside the United States; and Support supply chain traceability and integrity efforts. II. Discussion and.... For Contractors registered in the System for Award Management (SAM), the DLA Logistics Information...

  20. Phase II Recommendations by the Air Quality Management Subcommittee to the Clean Air Act Advisory Committee

    EPA Pesticide Factsheets

    The primary charge of the AQM Subcommittee was to develop recommendations to improve the air quality management system and address the air quality challenges in this country expected over the next 10 to 20 years. This report addresses those challenges.

  1. 77 FR 58845 - Proposed Data Collections Submitted for Public Comment and Recommendations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... Management Systems Assessment Tool. Phase II Miners Focus Groups.... 30 1 1 30 Phase III Miners Experimental... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention [60Day-12-12SG... on proposed data collection projects, the Centers for Disease Control and Prevention (CDC) will...

  2. Integrated Distribution Management System for Alabama Principal Investigator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schatz, Joe

    2013-03-31

    Southern Company Services, under contract with the Department of Energy, along with Alabama Power, Alstom Grid (formerly AREVA T&D) and others moved the work product developed in the first phase of the Integrated Distribution Management System (IDMS) from “Proof of Concept” to true deployment through the activity described in this Final Report. This Project – Integrated Distribution Management Systems in Alabama – advanced earlier developed proof of concept activities into actual implementation and furthermore completed additional requirements to fully realize the benefits of an IDMS. These tasks include development and implementation of a Distribution System based Model that enables datamore » access and enterprise application integration.« less

  3. Measuring quality progress

    NASA Astrophysics Data System (ADS)

    Lambert, Larry D.

    The study by the American Productivity & Quality Center (APQC) was commissioned by Loral Space Information Systems, Inc. and the National Aeronautics and Space Administration (NASA) to evaluate internal assessment systems. APQC benchmarked approaches to the internal assessment of quality management systems in three phases. The first phase included work conducted for the International Benchmarking Clearinghouse (IBC) and consisted of an in-depth analysis of the 1991 Malcolm Baldrige National Quality Award criteria. The second phase was also performed for the IBC and compared the 1991 award criteria among the following quality awards: Deming Prize, Malcolm Baldrige National Quality Award, The President's Award for Quality and Productivity Improvement, The NASA Excellence Award (The George M. Lowe Trophy) for Quality and Productivity Improvement and the Shigeo Shingo Award for Excellence in Manufacturing. The third phase compared the internal implementation approaches of 23 companies selected from American industry for their recognized, formal assessment systems.

  4. Measuring quality progress

    NASA Technical Reports Server (NTRS)

    Lambert, Larry D.

    1992-01-01

    The study by the American Productivity & Quality Center (APQC) was commissioned by Loral Space Information Systems, Inc. and the National Aeronautics and Space Administration (NASA) to evaluate internal assessment systems. APQC benchmarked approaches to the internal assessment of quality management systems in three phases. The first phase included work conducted for the International Benchmarking Clearinghouse (IBC) and consisted of an in-depth analysis of the 1991 Malcolm Baldrige National Quality Award criteria. The second phase was also performed for the IBC and compared the 1991 award criteria among the following quality awards: Deming Prize, Malcolm Baldrige National Quality Award, The President's Award for Quality and Productivity Improvement, The NASA Excellence Award (The George M. Lowe Trophy) for Quality and Productivity Improvement and the Shigeo Shingo Award for Excellence in Manufacturing. The third phase compared the internal implementation approaches of 23 companies selected from American industry for their recognized, formal assessment systems.

  5. Change Theory for Accounting System Reform in Health Sector: A Case Study of Kerman University of Medical Sciences in Iran

    PubMed Central

    Mehrolhassani, Mohammad Hossein; Emami, Mozhgan

    2013-01-01

    Background: Change theories provide an opportunity for organizational managers to plan, monitor and evaluate changes using a framework which enable them, among others, to show a fast response to environmental fluctuations and to predict the changing patterns of individuals and technology. The current study aimed to explore whether the change in the public accounting system of the Iranian health sector has followed Kurt Lewin’s change theory or not. Methods: This study which adopted a mixed methodology approach, qualitative and quantitative methods, was conducted in 2012. In the first phase of the study, 41 participants using purposive sampling and in the second phase, 32 affiliated units of Kerman University of Medical Sciences (KUMS) were selected as the study sample. Also, in phase one, we used face-to-face in-depth interviews (6 participants) and the quote method (35 participants) for data collection. We used a thematic framework analysis for analyzing data. In phase two, a questionnaire with a ten-point Likert scale was designed and then, data were analyzed using descriptive indicators, principal component and factorial analyses. Results: The results of phase one yielded a model consisting of four categories of superstructure, apparent infrastructure, hidden infrastructure and common factors. By linking all factors, totally, 12 components based on the quantitative results showed that the state of all components were not satisfactory at KUMS (5.06±2.16). Leadership and management; and technology components played the lowest and the greatest roles in implementing the accrual accounting system respectively. Conclusion: The results showed that the unfreezing stage did not occur well and the components were immature, mainly because the emphasis was placed on superstructure components rather than the components of hidden infrastructure. The study suggests that a road map should be developed in the financial system based on Kurt Lewin’s change theory and the model presented in this paper underpins the change management in any organizations. PMID:24596885

  6. Change theory for accounting system reform in health sector: a case study of kerman university of medical sciences in iran.

    PubMed

    Mehrolhassani, Mohammad Hossein; Emami, Mozhgan

    2013-11-01

    Change theories provide an opportunity for organizational managers to plan, monitor and evaluate changes using a framework which enable them, among others, to show a fast response to environmental fluctuations and to predict the changing patterns of individuals and technology. The current study aimed to explore whether the change in the public accounting system of the Iranian health sector has followed Kurt Lewin's change theory or not. This study which adopted a mixed methodology approach, qualitative and quantitative methods, was conducted in 2012. In the first phase of the study, 41 participants using purposive sampling and in the second phase, 32 affiliated units of Kerman University of Medical Sciences (KUMS) were selected as the study sample. Also, in phase one, we used face-to-face in-depth interviews (6 participants) and the quote method (35 participants) for data collection. We used a thematic framework analysis for analyzing data. In phase two, a questionnaire with a ten-point Likert scale was designed and then, data were analyzed using descriptive indicators, principal component and factorial analyses. The results of phase one yielded a model consisting of four categories of superstructure, apparent infrastructure, hidden infrastructure and common factors. By linking all factors, totally, 12 components based on the quantitative results showed that the state of all components were not satisfactory at KUMS (5.06±2.16). Leadership and management; and technology components played the lowest and the greatest roles in implementing the accrual accounting system respectively. The results showed that the unfreezing stage did not occur well and the components were immature, mainly because the emphasis was placed on superstructure components rather than the components of hidden infrastructure. The study suggests that a road map should be developed in the financial system based on Kurt Lewin's change theory and the model presented in this paper underpins the change management in any organizations.

  7. Human Factors in Aviation Maintenance. Phase 1

    DTIC Science & Technology

    1991-11-01

    Aircraft Maintenance Information SystemSupyyse AMP ......... Aircraft Maintenance Personnel CRM ....... Cockpit Resource Management AMT... developments were sponsored by the Department of interchange of relevant information between system par- Defense (DoD). Fewer than twenty systems are...ofindividuals without complicating lines ofcommand andothers in the maintenance system is repeated for row "I." orthe allocation ofresponsibility

  8. A system of vegetation classification applied to Hawaii

    Treesearch

    Michael G. Buck; Timothy E. Paysen

    1984-01-01

    A classification system for use in describing vegetation has been developed for Hawaii. Physiognomic and taxonomic criteria are used for a hierarchical stratification of vegetation in which the system categories are Formation, Subformation, Series, Association, and Phase. The System applies to local resource management activities and serves as a framework for resource...

  9. NASA System Engineering Design Process

    NASA Technical Reports Server (NTRS)

    Roman, Jose

    2011-01-01

    This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.

  10. Long-Term Information Management (LTIM) of Safeguards Data at Repositories: Phase II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haddal, Risa N.

    One of the challenges of implementing safeguards for geological repositories will be the long-term preservation of safeguards-related data for 100 years or more. While most countries considering the construction and operation of such facilities agree that safeguards information should be preserved, there are gaps with respect to standardized requirements, guidelines, timescales, and approaches. This study analyzes those gaps and explores research to clarify stakeholder needs, identify current policies, approaches, best practices and international standards, and explores existing safeguards information management infrastructure. The study also attempts to clarify what a safeguards data classification system might look like, how long data shouldmore » be retained, and how information should be exchanged between stakeholders at different phases of a repository’s life cycle. The analysis produced a variety of recommendations on what information to preserve, how to preserve it, where to store it, retention options and how to exchange information in the long term. Key findings include the use of the globally recognized international records management standard, ISO15489, for guidance on the development of information management systems, and the development of a Key Information File (KIF). The KIF could be used to identify only the most relevant, high-level safeguards information and the history of decision making about the repository. The study also suggests implementing on-site and off-site records storage in digital and physical form; developing a safeguards data classification system; long-term records retention with periodic reviews every 5 to 10 years during each phase of the repository life cycle; and establishing transition procedures well in advance so that data shepherds and records officers can transfer information with incoming facility managers effectively and efficiently. These and other recommendations are further analyzed in this study.« less

  11. Overview of ATLAS PanDA Workload Management

    NASA Astrophysics Data System (ADS)

    Maeno, T.; De, K.; Wenaus, T.; Nilsson, P.; Stewart, G. A.; Walker, R.; Stradling, A.; Caballero, J.; Potekhin, M.; Smith, D.; ATLAS Collaboration

    2011-12-01

    The Production and Distributed Analysis System (PanDA) plays a key role in the ATLAS distributed computing infrastructure. All ATLAS Monte-Carlo simulation and data reprocessing jobs pass through the PanDA system. We will describe how PanDA manages job execution on the grid using dynamic resource estimation and data replication together with intelligent brokerage in order to meet the scaling and automation requirements of ATLAS distributed computing. PanDA is also the primary ATLAS system for processing user and group analysis jobs, bringing further requirements for quick, flexible adaptation to the rapidly evolving analysis use cases of the early datataking phase, in addition to the high reliability, robustness and usability needed to provide efficient and transparent utilization of the grid for analysis users. We will describe how PanDA meets ATLAS requirements, the evolution of the system in light of operational experience, how the system has performed during the first LHC data-taking phase and plans for the future.

  12. Overview of ATLAS PanDA Workload Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maeno T.; De K.; Wenaus T.

    2011-01-01

    The Production and Distributed Analysis System (PanDA) plays a key role in the ATLAS distributed computing infrastructure. All ATLAS Monte-Carlo simulation and data reprocessing jobs pass through the PanDA system. We will describe how PanDA manages job execution on the grid using dynamic resource estimation and data replication together with intelligent brokerage in order to meet the scaling and automation requirements of ATLAS distributed computing. PanDA is also the primary ATLAS system for processing user and group analysis jobs, bringing further requirements for quick, flexible adaptation to the rapidly evolving analysis use cases of the early datataking phase, in additionmore » to the high reliability, robustness and usability needed to provide efficient and transparent utilization of the grid for analysis users. We will describe how PanDA meets ATLAS requirements, the evolution of the system in light of operational experience, how the system has performed during the first LHC data-taking phase and plans for the future.« less

  13. Design of a case management model for people with chronic disease (Heart Failure and COPD). Phase I: modeling and identification of the main components of the intervention through their actors: patients and professionals (DELTA-icE-PRO Study).

    PubMed

    Morales-Asencio, Jose M; Martin-Santos, Francisco J; Morilla-Herrera, Juan C; Fernández-Gallego, Magdalena Cuevas; Celdrán-Mañas, Miriam; Navarro-Moya, Francisco J; Rodríguez-Salvador, Maria M; Muñoz-Ronda, Francisco J; Gonzalo-Jiménez, Elena; Carrasco, Almudena Millán

    2010-12-02

    Chronic diseases account for nearly 60% of deaths around the world. The extent of this silent epidemic has not met determined responses in governments, policies or professionals in order to transform old Health Care Systems, configured for acute diseases. There is a large list of research about alternative models for people with chronic conditions, many of them with an advanced practice nurse as a key provider, as case management. But some methodological concerns raise, above all, the design of the intervention (intensity, frequency, components, etc). General: To develop the first and second phases (theorization and modeling) for designing a multifaceted case-management intervention in people with chronic conditions (COPD and heart failure) and their caregivers. 1) To identify key events in people living with chronic disease and their relation with the Health Care System, from their point of view. 2) To know the coping mechanisms developed by patients and their caregivers along the story with the disease. 3) To know the information processing and its utilization in their interactions with health care providers. 4) To detect potential unmet needs and the ways deployed by patients and their caregivers to resolve them. 5) To obtain a description from patients and caregivers, about their itineraries along the Health Care System, in terms of continuity, accessibility and comprehensiveness of care. 6) To build up a list of promising case-management interventions in patients with Heart Failure and COPD with this information in order to frame it into theoretical models for its reproducibility and conceptualization. 7) To undergo this list to expert judgment to assess its feasibility and pertinence in the Andalusian Health Care. Qualitative research with two phases: For the first five objectives, a qualitative technique with biographic stories will be developed and, for the remaining objectives, an expert consensus through Delphi technique, on the possible interventions yielded from the first phase. The study will be developed in the provinces of Almería, Málaga and Granada in the Southern Spain, from patients included in the Andalusian Health Care Service database with the diagnosis of COPD or Heart Failure, with the collaboration of case manager nurses and general practitioners for the assessment of their suitability to inclusion criteria. Patients and caregivers will be interviewed in their homes or their Health Centers, with their family or their case manager nurse as mediator. First of a series of studies intended to design a case-management service for people with heart failure and COPD, in the Andalusian Health Care System, where case management has been implemented since 2002. Accordingly with the steps of a theoretical model for complex interventions, in this study, theorization and intervention modeling phases will be developed.

  14. Arterial link travel time estimation using loop detector data : phase 1

    DOT National Transportation Integrated Search

    1997-11-01

    The envisioned operational tests of Advanced Traveler Information Systems (ATIS) and Advanced Traffic Management Systems (ATMS) in the Minneapolis/St. Paul area call for the provision of timely and reliable travel times over an entire rod network. Un...

  15. Upper Atmosphere Research Satellite (UARS) science data processing center implementation history

    NASA Technical Reports Server (NTRS)

    Herring, Ellen L.; Taylor, K. David

    1990-01-01

    NASA-Goddard is responsible for the development of a ground system for the Upper Atmosphere Research Satellite (UARS) observatory, whose launch is scheduled for 1991. This ground system encompasses a dedicated Central Data Handling Facility (CDHF); attention is presently given to the management of software systems design and implementation phases for CDHF by the UARS organization. Also noted are integration and testing activities performed following software deliveries to the CDHF. The UARS project has an obvious requirement for a powerful and flexible data base management system; an off-the-shelf commercial system has been incorporated.

  16. A vegetation classification system for use in California: its conceptual basis

    Treesearch

    Timothy E. Paysen; Jeanine A. Derby; C. Eugene Conrad

    1982-01-01

    A taxonomic Vegetation Classification System proposed for use in California is designed to simplify interdisciplinary communication about vegetation. The system structure is an aggregative plant community hierarchy at four levels of precision--the Association, Series, Subformation, and Formation. A flexible Phase category links specific resource management concerns to...

  17. The 40-kw field test power plant modification and development, phase 2

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Progression on the design and development of a 40 KW fuel cell system for on-site installation for providing both thermal and electrical power is reported. Development of the steam reformer fuel processor, power section, inverter, control system, and thermal management and water treatment systems is described.

  18. Experimental study of a passive thermal management system for high-powered lithium ion batteries using porous metal foam saturated with phase change materials

    NASA Astrophysics Data System (ADS)

    Li, W. Q.; Qu, Z. G.; He, Y. L.; Tao, Y. B.

    2014-06-01

    A highly efficient thermal strategy to manage a high-powered Li-ion battery package within the required safe temperature range is of great demand for electric vehicles (EVs) applications. A sandwiched cooling structure using copper metal foam saturated with phase change materials was designed. The thermal efficiency of the system was experimentally evaluated and compared with two control cases: a cooling mode with pure phase change materials and an air-cooling mode. The results showed that the thermal management with air natural convection cannot fulfill the safety demand of the Li-ion battery. The use of pure PCM can dramatically reduce the surface temperature and maintain the temperature within an allowable range due to the latent heat absorption and the natural convection of the melted PCM during the melting process. The foam-paraffin composite further reduced the battery's surface temperature and improved the uniformity of the temperature distribution caused by the improvement of the effective thermal conductivity. Additionally, the battery surface temperature increased with an increase in the porosity and the pore density of the metal foam.

  19. NASA's Risk Management System

    NASA Technical Reports Server (NTRS)

    Perera, Jeevan S.

    2011-01-01

    Leadership is key to success. Phased-approach for implementation of risk management is necessary. Risk management system will be simple, accessible and promote communication of information to all relevant stakeholders for optimal resource allocation and risk mitigation. Risk management should be used by all team members to manage risks -- risk office personnel. Each group is assigned Risk Integrators who are facilitators for effective risk management. Risks will be managed at the lowest-level feasible, elevate only those risks that require coordination or management from above. Risk reporting and communication is an essential element of risk management and will combine both qualitative and quantitative elements. Risk informed decision making should be introduced to all levels of management. Provide necessary checks and balances to insure that risks are caught/identified and dealt with in a timely manner. Many supporting tools, processes & training must be deployed for effective risk management implementation. Process improvement must be included in the risk processes.

  20. Recent Naval Postgraduate School Publications

    DTIC Science & Technology

    1988-08-30

    kind. Part 1: Regular kernals Applied Mathematics and Computation, vol. 21, p. 171-184, (1987). Neta B- Williams, R T Stability and phase speed for...Cong., Oslo Norway Aug. 5-9, 1985. IN Proc., IMAC, p. 209-213, (198). Neta Bi Williams, R T Stability and phase speed for various finite element...development phases DoD Software Technol. for Adaptable, Reliable Systems (STARS) Business Practices Area Manage. Workshop, Los Angeles, CA, Nov. 18-22, (1985

  1. A New Strategic Direction for the AAHSLD Annual Statistics: Planning, Service Roles, Performance Measures, and Management Information Systems for Academic Health Science Libraries: Final Report for Phase I.

    ERIC Educational Resources Information Center

    McClure, Charles R.; And Others

    This report presents a summary of activities, findings, and recommendations from Phase I of a project to improve the effectiveness of academic health science libraries and their provision of information services. The objectives for Phase I of the project are given: (1) to identify academic health science library requirements in the areas of…

  2. Mediating the Cognitive Walkthrough with Patient Groups to achieve Personalized Health in Chronic Disease Self-Management System Evaluation.

    PubMed

    Georgsson, Mattias; Kushniruk, Andre

    2016-01-01

    The cognitive walkthrough (CW) is a task-based, expert inspection usability evaluation method involving benefits such as cost effectiveness and efficiency. A drawback of the method is that it doesn't involve the user perspective from real users but instead is based on experts' predictions about the usability of the system and how users interact. In this paper, we propose a way of involving the user in an expert evaluation method by modifying the CW with patient groups as mediators. This along with other modifications include a dual domain session facilitator, specific patient groups and three different phases: 1) a preparation phase where suitable tasks are developed by a panel of experts and patients, validated through the content validity index 2) a patient user evaluation phase including an individual and collaborative process part 3) an analysis and coding phase where all data is digitalized and synthesized making use of Qualitative Data Analysis Software (QDAS) to determine usability deficiencies. We predict that this way of evaluating will utilize the benefits of the expert methods, also providing a way of including the patient user of these self-management systems. Results from this prospective study should provide evidence of the usefulness of this method modification.

  3. Biogas production enhancement using semi-aerobic pre-aeration in a hybrid bioreactor landfill.

    PubMed

    Cossu, Raffaello; Morello, Luca; Raga, Roberto; Cerminara, Giulia

    2016-09-01

    Landfilling continues to be one of the main methods used in managing Municipal Solid Waste (MSW) worldwide, particularly in developing countries. Although in many countries national legislation aims to reduce this practice as much as possible, landfill is a necessary and unavoidable step in closing the material cycle. The need for innovative waste management techniques to improve landfill management and minimize the adverse environmental impact produced has resulted in an increasing interest in innovative systems capable of accelerating waste stabilization. Landfill bioreactors allow decomposition kinetics to be increased and post-operational phase to be shortened; in particular, hybrid bioreactors combine the benefits afforded by both aerobic and anaerobic processes. Six bioreactor simulators were used in the present study: four managed as hybrid, with an initial semi-aerobic phase and a second anaerobic phase, and two as anaerobic control bioreactors. The main goal of the first aerated phase is to reduce Volatile Fatty Acids (VFA) in order to increase pH and enhance methane production during the anaerobic phase; for this reason, air injection was stopped only when these parameters reached the optimum range for methanogenic bacteria. Biogas and leachate were constantly monitored throughout the entire methanogenic phase with the aim of calibrating a Gompertz Model and evaluating the effects of pre-aeration on subsequent methane production. The results showed that moderate and intermittent pre-aeration produces a positive effect both on methane potential and in the kinetics of reaction. Copyright © 2015 Elsevier Ltd. All rights reserved.

  4. System engineering and management in a large and diverse multinational consortium

    NASA Astrophysics Data System (ADS)

    Wright, David; O'Sullivan, Brian; Thatcher, John; Renouf, Ian; Wright, Gillian; Wells, Martyn; Glasse, Alistair; Grozinger, Ulrich; Sykes, Jon; Smith, Dave; Eccleston, Paul; Shaughnessy, Bryan

    2008-07-01

    This paper elaborates the system engineering methods that are being successfully employed within the European Consortium (EC) to deliver the Optical System of the Mid Infa-Red Instrument (MIRI) to the James Webb Space Telescope (JWST). The EC is a Consortium of 21 institutes located in 10 European countries and, at instrument level, it works in a 50/50 partnership with JPL who are providing the instrument cooler, software and detector systems. The paper will describe how the system engineering approach has been based upon proven principles used in the space industry but applied in a tailored way that best accommodates the differences in international practices and standards with a primary aim of ensuring a cost-effective solution which supports all science requirements for the mission. The paper will recall how the system engineering has been managed from the definition of the system requirements in early phase B, through the successful Critical Design Review at the end of phase C and up to the test and flight build activities that are presently in progress. Communication and coordination approaches will also be discussed.

  5. Development of demand forecasting tool for natural resources recouping from municipal solid waste.

    PubMed

    Zaman, Atiq Uz; Lehmann, Steffen

    2013-10-01

    Sustainable waste management requires an integrated planning and design strategy for reliable forecasting of waste generation, collection, recycling, treatment and disposal for the successful development of future residential precincts. The success of the future development and management of waste relies to a high extent on the accuracy of the prediction and on a comprehensive understanding of the overall waste management systems. This study defies the traditional concepts of waste, in which waste was considered as the last phase of production and services, by putting forward the new concept of waste as an intermediate phase of production and services. The study aims to develop a demand forecasting tool called 'zero waste index' (ZWI) for measuring the natural resources recouped from municipal solid waste. The ZWI (ZWI demand forecasting tool) quantifies the amount of virgin materials recovered from solid waste and subsequently reduces extraction of natural resources. In addition, the tool estimates the potential amount of energy, water and emissions avoided or saved by the improved waste management system. The ZWI is tested in a case study of waste management systems in two developed cities: Adelaide (Australia) and Stockholm (Sweden). The ZWI of waste management systems in Adelaide and Stockholm is 0.33 and 0.17 respectively. The study also enumerates per capita energy savings of 2.9 GJ and 2.83 GJ, greenhouse gas emissions reductions of 0.39 tonnes (CO2e) and 0.33 tonnes (CO2e), as well as water savings of 2.8 kL and 0.92 kL in Adelaide and Stockholm respectively.

  6. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  7. Regional freight information resources for market opportunities in the Great Lakes maritime transportation system : phase II.

    DOT National Transportation Integrated Search

    2009-11-01

    The Great Lakes Maritime Information Delivery System (GLMIDS) is designed to facilitate the acquisition, storage, management, analysis and exchange of data between analysts and decision-makers within maritime commerce. (See http://maritime.utoledo.ed...

  8. 77 FR 40911 - Solicitation for a Cooperative Agreement-Technical Assistance Site Management in NIC's Evidence...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... policymaking bodies to collectively improve the effectiveness and capacity of their decision making related to...-based decision making in local criminal justice systems. The goal of Phase I of the initiative was to... principle product of Phase I of this initiative was the Evidence-Based Decision Making Framework in Local...

  9. 78 FR 53494 - Dam Safety Modifications at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... fundamental part of this mission was the construction and operation of an integrated system of dams and... by the Federal Emergency Management Agency, TVA prepares for the worst case flooding event in order... appropriate best management practices during all phases of construction and maintenance associated with the...

  10. Forest-fire models

    Treesearch

    Haiganoush Preisler; Alan Ager

    2013-01-01

    For applied mathematicians forest fire models refer mainly to a non-linear dynamic system often used to simulate spread of fire. For forest managers forest fire models may pertain to any of the three phases of fire management: prefire planning (fire risk models), fire suppression (fire behavior models), and postfire evaluation (fire effects and economic models). In...

  11. 75 FR 35122 - Approval of Noise Compatibility Program for Buckeye Municipal Airport, Town of Buckeye, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... the Aviation Safety and Noise Abatement Act, hereinafter referred to as ``the Act'') and 14 Code of... and management of the navigable airspace and air traffic control systems, or adversely affecting other... compatibility program comprised of actions designed for phased implementation by airport management and adjacent...

  12. Study of toluene rotary fluid management device and shear flow condenser performance for a space-based organic Rankine power system

    NASA Technical Reports Server (NTRS)

    Havens, Vance; Ragaller, Dana

    1988-01-01

    Management of two-phase fluid and control of the heat transfer process in microgravity is a technical challenge that must be addressed for an orbital Organic Rankine Cycle (ORC) application. A test program was performed in 1-g that satisfactorily demonstrated the two-phase management capability of the rotating fluid management device (RFMD) and shear-flow condenser. Operational tests of the RFMD and shear flow condenser in adverse gravity orientations, confirmed that the centrifugal forces in the RFMD and the shear forces in the condenser were capable of overcoming gravity forces. In a microgravity environment, these same forces would not have to compete against gravity and would therefore be dominant. The specific test program covered the required operating range of the Space Station Solar Dynamic Rankine Cycle power system. Review of the test data verified that: fluid was pumped from the RFMD in all attitudes; subcooled states in the condenser were achieved; condensate was pushed uphill against gravity; and noncondensible gases were swept through the condenser.

  13. Countermeasure Evaluation and Validation Project (CEVP) Database Requirement Documentation

    NASA Technical Reports Server (NTRS)

    Shin, Sung Y.

    2003-01-01

    The initial focus of the project by the JSC laboratories will be to develop, test and implement a standardized complement of integrated physiological test (Integrated Testing Regimen, ITR) that will examine both system and intersystem function, and will be used to validate and certify candidate countermeasures. The ITR will consist of medical requirements (MRs) and non-MR core ITR tests, and countermeasure-specific testing. Non-MR and countermeasure-specific test data will be archived in a database specific to the CEVP. Development of a CEVP Database will be critical to documenting the progress of candidate countermeasures. The goal of this work is a fully functional software system that will integrate computer-based data collection and storage with secure, efficient, and practical distribution of that data over the Internet. This system will provide the foundation of a new level of interagency and international cooperation for scientific experimentation and research, providing intramural, international, and extramural collaboration through management and distribution of the CEVP data. The research performed this summer includes the first phase of the project. The first phase of the project is a requirements analysis. This analysis will identify the expected behavior of the system under normal conditions and abnormal conditions; that could affect the system's ability to produce this behavior; and the internal features in the system needed to reduce the risk of unexpected or unwanted behaviors. The second phase of this project have also performed in this summer. The second phase of project is the design of data entry screen and data retrieval screen for a working model of the Ground Data Database. The final report provided the requirements for the CEVP system in a variety of ways, so that both the development team and JSC technical management have a thorough understanding of how the system is expected to behave.

  14. Development of a system for off-peak electrical energy use by air conditioners and heat pumps

    NASA Astrophysics Data System (ADS)

    Russell, L. D.

    1980-05-01

    Investigation and evaluation of several alternatives for load management for the TVA system are described. Specific data for the TVA system load characteristics were studied to determine the typical peak and off peak periods for the system. The alternative systems investigated for load management included gaseous energy storage, phase change materials energy storage, zeolite energy storage, variable speed controllers for compressors, and weather sensitive controllers. After investigating these alternatives, system design criteria were established; then, the gaseous and PCM energy storage systems were analyzed. The system design criteria include economic assessment of all alternatives. Handbook data were developed for economic assessment. A liquid/PCM energy storage system was judged feasible.

  15. Managing Data From Signal-Propagation Experiments

    NASA Technical Reports Server (NTRS)

    Kantak, A. V.

    1989-01-01

    Computer programs generate characteristic plots from amplitudes and phases. Software system enables minicomputer to process data on amplitudes and phases of signals received during experiments in ground-mobile/satellite radio propagation. Takes advantage of file-handling capabilities of UNIX operating system and C programming language. Interacts with user, under whose guidance programs in FORTRAN language generate plots of spectra or other curves of types commonly used to characterize signals. FORTRAN programs used to process file-handling outputs into any of several useful forms.

  16. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  17. Using Geo-Data Corporately on the Response Phase of Emergency Management

    NASA Astrophysics Data System (ADS)

    Demir Ozbek, E.; Ates, S.; Aydinoglu, A. C.

    2015-08-01

    Response phase of emergency management is the most complex phase in the entire cycle because it requires cooperation between various actors relating to emergency sectors. A variety of geo-data is needed at the emergency response such as; existing data provided by different institutions and dynamic data collected by different sectors at the time of the disaster. Disaster event is managed according to elaborately defined activity-actor-task-geodata cycle. In this concept, every activity of emergency response is determined with Standard Operation Procedure that enables users to understand their tasks and required data in any activity. In this study, a general conceptual approach for disaster and emergency management system is developed based on the regulations to serve applications in Istanbul Governorship Provincial Disaster and Emergency Directorate. The approach is implemented to industrial facility explosion example. In preparation phase, optimum ambulance locations are determined according to general response time of the ambulance to all injury cases in addition to areas that have industrial fire risk. Management of the industrial fire case is organized according to defined actors, activities, and working cycle that describe required geo-data. A response scenario was prepared and performed for an industrial facility explosion event to exercise effective working cycle of actors. This scenario provides using geo-data corporately between different actors while required data for each task is defined to manage the industrial facility explosion event. Following developing web technologies, this scenario based approach can be effective to use geo-data on the web corporately.

  18. Definition of two-phase flow behaviors for spacecraft design

    NASA Technical Reports Server (NTRS)

    Reinarts, Thomas R.; Best, Frederick R.; Miller, Katherine M.; Hill, Wayne S.

    1991-01-01

    Data for complete models of two-phase flow in microgravity are taken from in-flight experiments and applied to an adiabatic flow-regime analysis to study the feasibility of two-phase systems for spacecraft. The data are taken from five in-flight experiments by Hill et al. (1990) in which a two-phase pump circulates a freon mixture and vapor and liquid flow streams are measured. Adiabatic flow regimes are analyzed based on the experimental superficial velocities of liquid and vapor, and comparisons are made with the results of two-phase flow regimes at 1 g. A motion analyzer records the flow characteristics at a rate of 1000 frames/sec, and stratified flow regimes are reported at 1 g. The flow regimes observed under microgravitational conditions are primarily annular and include slug and bubbly-slug regimes. The present data are of interest to the design and analysis of two-phase thermal-management systems for use in space missions.

  19. Armored Family of Vehicles (AFV). Phase 1 Report. Book 7. Volume 11

    DTIC Science & Technology

    1987-08-31

    Armored Family of Vehicles. Specific requirements and products are described which initiate the training development process and a training management ...approach for the TRADOC and proponent schools to plan, develop, manage and integrate the training subsystem(s) for the Armored Family of Vehicles...Procedures. q. Charter, Armored Family of Vehicles. r. Operational and Organizational (O&W) Plan for AFV. s. System MANPRINT Management Plan for AFV

  20. Thermal management system technology development for space station applications

    NASA Technical Reports Server (NTRS)

    Rankin, J. G.; Marshall, P. F.

    1983-01-01

    A short discussion of the history to date of the NASA thermal management system technology development program is presented, and the current status of several ongoing studies and hardware demonstration tasks is reported. One element of technology that is required for long-life, high-power orbital platforms/stations that is being developed is heat rejection and a space-constructable radiator system. Aspects of this project include high-efficiency fin concepts, a heat pipe quick-disconnect device, high-capacity heat pipes, and an alternate interface heat exchanger design. In the area of heat acquisition and transport, developments in a pumped two-phase transport loop, a capillary pumped transport loop using the concept of thermal utility are reported. An example of a thermal management system concept is provided.

  1. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  2. Knowledge Capture and Management for Space Flight Systems

    NASA Technical Reports Server (NTRS)

    Goodman, John L.

    2005-01-01

    The incorporation of knowledge capture and knowledge management strategies early in the development phase of an exploration program is necessary for safe and successful missions of human and robotic exploration vehicles over the life of a program. Following the transition from the development to the flight phase, loss of underlying theory and rationale governing design and requirements occur through a number of mechanisms. This degrades the quality of engineering work resulting in increased life cycle costs and risk to mission success and safety of flight. Due to budget constraints, concerned personnel in legacy programs often have to improvise methods for knowledge capture and management using existing, but often sub-optimal, information technology and archival resources. Application of advanced information technology to perform knowledge capture and management would be most effective if program wide requirements are defined at the beginning of a program.

  3. Two-phase adiabatic pressure drop experiments and modeling under micro-gravity conditions

    NASA Astrophysics Data System (ADS)

    Longeot, Matthieu J.; Best, Frederick R.

    1995-01-01

    Thermal systems for space applications based on two phase flow have several advantages over single phase systems. Two phase thermal energy management and dynamic power conversion systems have the capability of achieving high specific power levels. However, before two phase systems for space applications can be designed effectively, knowledge of the flow behavior in a ``0-g'' acceleration environment is necessary. To meet this need, two phase flow experiments were conducted by the Interphase Transport Phenomena Laboratory Group (ITP) aboard the National Aeronautics and Space Administration's (NASA) KC-135, using R12 as the working fluid. The present work is concerned with modeling of two-phase pressure drop under 0-g conditions, for bubbly and slug flow regimes. The set of data from the ITP group includes 3 bubbly points, 9 bubbly/slug points and 6 slug points. These two phase pressure drop data were collected in 1991 and 1992. A methodology to correct and validate the data was developed to achieve high levels of confidence. A homogeneous model was developed to predict the pressure drop for particular flow conditions. This model, which uses the Blasius Correlation, was found to be accurate for bubbly and bubbly/slug flows, with errors not larger than 28%. For slug flows, however, the errors are greater, attaining values up to 66%.

  4. Phase 1 engineering and technical data report for the thermal control extravehicular life support system

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A shuttle EVLSS Thermal Control System (TCS) is defined. Thirteen heat rejection subsystems, thirteen water management subsystems, nine humidity control subsystems, three pressure control schemes and five temperature control schemes are evaluated. Sixteen integrated TCS systems are studied, and an optimum system is selected based on quantitative weighting of weight, volume, cost, complexity and other factors. The selected sybsystem contains a sublimator for heat rejection, a bubble expansion tank for water management, and a slurper and rotary separator for humidity control. Design of the selected subsystem prototype hardware is presented.

  5. Advanced Avionics Verification and Validation Phase II (AAV&V-II)

    DTIC Science & Technology

    1999-01-01

    Algorithm 2-8 2.7 The Weak Control Dependence Algorithm 2-8 2.8 The Indirect Dependence Algorithms 2-9 2.9 Improvements to the Pleiades Object...describes some modifications made to the Pleiades object management system to increase the speed of the analysis. 2.1 THE INTERPROCEDURAL CONTROL FLOW...slow as the edges in the graph increased. The time to insert edges was addressed by enhancements to the Pleiades object management system, which are

  6. Management System for Integrating Basic Skills 2 Training and Unit Training Programs

    DTIC Science & Technology

    1983-09-01

    Social Sciences. NOTEs The findings in this report are not to be construed as en official Department of the Army position, unless so designated by other...This report describes methods used and results obtained in the design , development, and field test of a management system and curriculum components...for integrating the Army’s Basic Skills Education Program, Phase II (BSEP II) and unit training programs. The curriculum components are designed to

  7. Human Resources in the Library System. Course 2, Study Guide. Final Report, Phase 2, Post-Master's Education for Middle and Upper-Level Personnel in Libraries and Information Centers.

    ERIC Educational Resources Information Center

    Goodman, Charles H.; Stone, Elizabeth W.

    A study guide is presented for a course designed for the continuing education of professional librarians at the level of middle or upper management who find that they need understanding about human resources in the library system beyond that acquired on the job or in previous library education. The course has four units: (1) Management: A Systems…

  8. The Large Synoptic Survey Telescope project management control system

    NASA Astrophysics Data System (ADS)

    Kantor, Jeffrey P.

    2012-09-01

    The Large Synoptic Survey Telescope (LSST) program is jointly funded by the NSF, the DOE, and private institutions and donors. From an NSF funding standpoint, the LSST is a Major Research Equipment and Facilities (MREFC) project. The NSF funding process requires proposals and D&D reviews to include activity-based budgets and schedules; documented basis of estimates; risk-based contingency analysis; cost escalation and categorization. "Out-of-the box," the commercial tool Primavera P6 contains approximately 90% of the planning and estimating capability needed to satisfy R&D phase requirements, and it is customizable/configurable for remainder with relatively little effort. We describe the customization/configuration and use of Primavera for the LSST Project Management Control System (PMCS), assess our experience to date, and describe future directions. Examples in this paper are drawn from the LSST Data Management System (DMS), which is one of three main subsystems of the LSST and is funded by the NSF. By astronomy standards the LSST DMS is a large data management project, processing and archiving over 70 petabyes of image data, producing over 20 petabytes of catalogs annually, and generating 2 million transient alerts per night. Over the 6-year construction and commissioning phase, the DM project is estimated to require 600,000 hours of engineering effort. In total, the DMS cost is approximately 60% hardware/system software and 40% labor.

  9. Security Techniques for Sensor Systems and the Internet of Things

    ERIC Educational Resources Information Center

    Midi, Daniele

    2016-01-01

    Sensor systems are becoming pervasive in many domains, and are recently being generalized by the Internet of Things (IoT). This wide deployment, however, presents significant security issues. We develop security techniques for sensor systems and IoT, addressing all security management phases. Prior to deployment, the nodes need to be hardened. We…

  10. Space station electrical power distribution analysis using a load flow approach

    NASA Technical Reports Server (NTRS)

    Emanuel, Ervin M.

    1987-01-01

    The space station's electrical power system will evolve and grow in a manner much similar to the present terrestrial electrical power system utilities. The initial baseline reference configuration will contain more than 50 nodes or busses, inverters, transformers, overcurrent protection devices, distribution lines, solar arrays, and/or solar dynamic power generating sources. The system is designed to manage and distribute 75 KW of power single phase or three phase at 20 KHz, and grow to a level of 300 KW steady state, and must be capable of operating at a peak of 450 KW for 5 to 10 min. In order to plan far into the future and keep pace with load growth, a load flow power system analysis approach must be developed and utilized. This method is a well known energy assessment and management tool that is widely used throughout the Electrical Power Utility Industry. The results of a comprehensive evaluation and assessment of an Electrical Distribution System Analysis Program (EDSA) is discussed. Its potential use as an analysis and design tool for the 20 KHz space station electrical power system is addressed.

  11. Integrated corridor management initiative : demonstration phase evaluation. Dallas institutional and organizational analysis test plan.

    DOT National Transportation Integrated Search

    2000-10-01

    The Advanced Rural Traveler Information System (ARTIS) began development June 30, 1995. While a number of activities were underway to operationally test and evaluate metro or urban traveler information systems in the 75 target markets, ARTIS setout t...

  12. State of the art evaluation of traffic detection and monitoring systems. Volume 1, phases A & B : design [Summary

    DOT National Transportation Integrated Search

    2007-10-01

    Accurate, complete, and timely traffic data is critical to the effective management of Arizonas highway system. Limitations in current traffic monitoring abilities are an ongoing challenge for the Arizona Department of Transportation (ADOT) and fo...

  13. Stand Alone Battery Thermal Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brodie, Brad

    The objective of this project is research, development and demonstration of innovative thermal management concepts that reduce the cell or battery weight, complexity (component count) and/or cost by at least 20%. The project addresses two issues that are common problems with current state of the art lithium ion battery packs used in vehicles; low power at cold temperatures and reduced battery life when exposed to high temperatures. Typically, battery packs are “oversized” to satisfy the two issues mentioned above. The first phase of the project was spent making a battery pack simulation model using AMEsim software. The battery pack usedmore » as a benchmark was from the Fiat 500EV. FCA and NREL provided vehicle data and cell data that allowed an accurate model to be created that matched the electrical and thermal characteristics of the actual battery pack. The second phase involved using the battery model from the first phase and evaluate different thermal management concepts. In the end, a gas injection heat pump system was chosen as the dedicated thermal system to both heat and cool the battery pack. Based on the simulation model. The heat pump system could use 50% less energy to heat the battery pack in -20°C ambient conditions, and by keeping the battery cooler at hot climates, the battery pack size could be reduced by 5% and still meet the warranty requirements. During the final phase, the actual battery pack and heat pump system were installed in a test bench at DENSO to validate the simulation results. Also during this phase, the system was moved to NREL where testing was also done to validate the results. In conclusion, the heat pump system can improve “fuel economy” (for electric vehicle) by 12% average in cold climates. Also, the battery pack size, or capacity, could be reduced 5%, or if pack size is kept constant, the pack life could be increased by two years. Finally, the total battery pack and thermal system cost could be reduced 5% only if the system is integrated with the vehicle cabin air conditioning system. The reason why we were not able to achieve the 20% reduction target is because of the natural decay of the battery cell due to the number of cycles. Perhaps newer battery chemistries that are not so sensitive to cycling would have more potential for reducing the battery size due to thermal issues.« less

  14. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: KDP-A for Phase 2 Minimum Operational Performance Standards

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie; Hackenberg, Davis L.

    2016-01-01

    UAS Integration in the NAS Project has: a) Developed Technical Challenges that are crucial to UAS integration, aligned with NASA's Strategic Plan and Thrusts, and support FAA standards development. b) Demonstrated rigorous project management processes through the execution of previous phases. c) Defined Partnership Plans. d) Established path to KDP-C. Request approval of Technical Challenges, execution of partnerships and plans, and execution of near-term FY17 activities. There is an increasing need to fly UAS in the NAS to perform missions of vital importance to National Security and Defense, Emergency Management, and Science. There is also an emerging need to enable commercial applications such as cargo transport (e.g. FedEx). Unencumbered NAS Access for Civil/Commercial UAS. Provide research findings, utilizing simulation and flight tests, to support the development and validation of DAA and C2 technologies necessary for integrating Unmanned Aircraft Systems into the National Airspace System.

  15. System dynamic modeling on construction waste management in Shenzhen, China.

    PubMed

    Tam, Vivian W Y; Li, Jingru; Cai, Hong

    2014-05-01

    This article examines the complexity of construction waste management in Shenzhen, Mainland China. In-depth analysis of waste generation, transportation, recycling, landfill and illegal dumping of various inherent management phases is explored. A system dynamics modeling using Stella model is developed. Effects of landfill charges and also penalties from illegal dumping are also simulated. The results show that the implementation of comprehensive policy on both landfill charges and illegal dumping can effectively control the illegal dumping behavior, and achieve comprehensive construction waste minimization. This article provides important recommendations for effective policy implementation and explores new perspectives for Shenzhen policy makers.

  16. Information technology and emergency management: preparedness and planning in US states.

    PubMed

    Reddick, Christopher

    2011-01-01

    The purpose of this paper is to examine the impact of information technology (IT) on emergency preparedness and planning by analysing a survey of US state government departments of emergency management. The research results show that there has been a significant impact of IT on emergency planning. IT has proven to be effective for all phases of emergency management, but especially for the response phase. There are numerous technologies used in emergency management, ranging from the internet, Geographic Information Systems and wireless technologies to more advanced hazard analysis models. All were generally viewed as being effective. Lack of financial resources and support from elected officials is a perennial problem in public administration, and was found to be prevalent in this study of IT and emergency management. There was evidence that state governments rating high on a performance index were more likely to use IT for emergency management. © 2011 The Author(s). Disasters © Overseas Development Institute, 2011.

  17. Cryogenic Fluid Management Facility

    NASA Technical Reports Server (NTRS)

    Eberhardt, R. N.; Bailey, W. J.

    1985-01-01

    The Cryogenic Fluid Management Facility is a reusable test bed which is designed to be carried within the Shuttle cargo bay to investigate the systems and technologies associated with the efficient management of cryogens in space. Cryogenic fluid management consists of the systems and technologies for: (1) liquid storage and supply, including capillary acquisition/expulsion systems which provide single-phase liquid to the user system, (2) both passive and active thermal control systems, and (3) fluid transfer/resupply systems, including transfer lines and receiver tanks. The facility contains a storage and supply tank, a transfer line and a receiver tank, configured to provide low-g verification of fluid and thermal models of cryogenic storage and transfer processes. The facility will provide design data and criteria for future subcritical cryogenic storage and transfer system applications, such as Space Station life support, attitude control, power and fuel depot supply, resupply tankers, external tank (ET) propellant scavenging, and ground-based and space-based orbit transfer vehicles (OTV).

  18. Evaluation criteria for the district health management information systems: lessons from the Ministry of Health, Kenya.

    PubMed

    Odhiambo-Otieno, George W; Odero, Wilson W O

    2005-03-01

    The District Health Management Information Systems (DHMISs) were established by the Ministry of Health (MoH) in Kenya more than two decades ago. Since then, no comprehensive evaluation has been undertaken. This can partly be attributed to lack of defined criteria for evaluating them. To propose evaluation criteria for assessing the design, implementation and impact of DHMIS in the management of the District Health System (DHS) in Kenya. A descriptive cross-sectional study conducted in three DHSs in Kenya: Bungoma, Murang'a and Uasin Gishu districts. Data was collected through focus group discussions, key informant interviews, and documents' review. The respondents, purposely selected from the Ministry of Health headquarters and the three DHS districts, included designers, managers and end-users of the systems. A set of evaluation criteria for DHMISs was identified for each of the three phases of implementation: pre-implementation evaluation criteria (categorised as policy and objectives, technical feasibility, financial viability, political viability and administrative operability) to be applied at the design stage; concurrent implementation evaluation criteria to be applied during implementation of the new system; and post-implementation evaluation criteria (classified as internal - quality of information; external - resources and managerial support; ultimate - systems impact) to be applied after implementation of the system for at least three years. In designing a DHMIS model there is need to have built-in these three sets of evaluation criteria which should be used in a phased manner. Pre-implementation evaluation criteria should be used to evaluate the system's viability before more resources are committed to it; concurrent (operational) - implementation evaluation criteria should be used to monitor the process; and post-implementation evaluation criteria should be applied to assess the system's effectiveness.

  19. Intranet-based safety documentation in management of major hazards and occupational health and safety.

    PubMed

    Leino, Antti

    2002-01-01

    In the European Union, Council Directive 96/82/EC requires operators producing, using, or handling significant amounts of dangerous substances to improve their safety management systems in order to better manage the major accident potentials deriving from human error. A new safety management system for the Viikinmäki wastewater treatment plant in Helsinki, Finland, was implemented in this study. The system was designed to comply with both the new safety liabilities and the requirements of OHSAS 18001 (British Standards Institute, 1999). During the implementation phase experiences were gathered from the development processes in this small organisation. The complete documentation was placed in the intranet of the plant. Hyperlinks between documents were created to ensure convenience of use. Documentation was made accessible for all workers from every workstation.

  20. Data management at Biosphere 2 center

    NASA Technical Reports Server (NTRS)

    McCreary, Leone F.

    1997-01-01

    Throughout the history of Biosphere 2, the collecting and recording of biological data has been sporadic. Currently no active effort to administer and record regular biological surveys is being made. Also, there is no central location, such as an on-site data library, where all records from various studies have been archived. As a research institute, good, complete data records are at the core of all Biosphere 2's scientific endeavors. It is therefore imperative that an effective data management system be implemented within the management and research departments as soon as possible. Establishing this system would require three general phases: (1) Design/implement a new archiving/management program (including storage, cataloging and retrieval systems); (2) Organize and input baseline and intermediate data from existing archives; and (3) Maintain records by inputting new data.

  1. Advanced Aircraft Electrical System Control Technology Demonstrator. Phase I. Requirements Analysis and Conceptual Design.

    DTIC Science & Technology

    1981-07-01

    System 13 (7) Flight Critical Power 15 (8) Power Bus Configuration 16 b. System Control and Protection 20...includes the main buses, external power receptacles and distribution feeders. The function of the distribution protection system * is mainly to provide...TechnicaI rea Manager Power Systems Branch Power Systems B nch Aerospace Power Division Aerospace Power Division FOR .AKE D . REAMS Chief,

  2. Policy-based Distributed Data Management

    NASA Astrophysics Data System (ADS)

    Moore, R. W.

    2009-12-01

    The analysis and understanding of climate variability and change builds upon access to massive collections of observational and simulation data. The analyses involve distributed computing, both at the storage systems (which support data subsetting) and at compute engines (for assimilation of observational data into simulations). The integrated Rule Oriented Data System (iRODS) organizes the distributed data into collections to facilitate enforcement of management policies, support remote data processing, and enable development of reference collections. Currently at RENCI, the iRODS data grid is being used to manage ortho-photos and lidar data for the State of North Carolina, provide a unifying storage environment for engagement centers across the state, support distributed access to visualizations of weather data, and is being explored to manage and disseminate collections of ensembles of meteorological and hydrological model results. In collaboration with the National Climatic Data Center, an iRODS data grid is being established to support data transmission from NCDC to ORNL, and to integrate NCDC archives with ORNL compute services. To manage the massive data transfers, parallel I/O streams are used between High Performance Storage System tape archives and the supercomputers at ORNL. Further, we are exploring the movement and management of large RADAR and in situ datasets to be used for data mining between RENCI and NCDC, and for the distributed creation of decision support and climate analysis tools. The iRODS data grid supports all phases of the scientific data life cycle, from management of data products for a project, to sharing of data between research institutions, to publication of data in a digital library, to preservation of data for use in future research projects. Each phase is characterized by a broader user community, with higher expectations for more detailed descriptions and analysis mechanisms for manipulating the data. The higher usage requirements are enforced by management policies that define the required metadata, the required data formats, and the required analysis tools. The iRODS policy based data management system automates the creation of the community chosen data products, validates integrity and authenticity assessment criteria, and enforces management policies across all accesses of the system.

  3. The organization of successful participative management in a health sciences library.

    PubMed Central

    Wood, M B

    1977-01-01

    The University of Washington Health Sciences Library, Seattle, and its participative management process are described in detail. The evolution of the management system is reviewed by interrelating the various phases of the library's growth, its service complexities, and its communication needs. Staff development results of this participative management mode are discussed. Reference is made to the use of group dynamics concepts. The current organizational design, which integrates the participative subunit with the simple line management structure, is considered effective by both the library staff and its director. PMID:843648

  4. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  5. Talent management best practices: how exemplary health care organizations create value in a down economy.

    PubMed

    Groves, Kevin S

    2011-01-01

    : Difficult economic conditions and powerful workforce trends pose significant challenges to managing talent in health care organizations. Although robust research evidence supports the many benefits of maintaining a strong commitment to talent management practices despite these challenges, many organizations compound the problem by resorting to workforce reductions and limiting or eliminating investments in talent management. : This study examines how nationwide health care systems address these challenges through best practice talent management systems. Addressing important gaps in talent management theory and practice, this study develops a best practice model of talent management that is grounded in the contextual challenges facing health care practitioners. : Utilizing a qualitative case study that examined 15 nationwide health care systems, data were collected through semistructured interviews with 30 executives and document analysis of talent management program materials submitted by each organization. : Exemplary health care organizations employ a multiphased talent management system composed of six sequential phases and associated success factors that drive effective implementation. Based on these findings, a model of talent management best practices in health care organizations is presented. : Health care practitioners may utilize the best practice model to assess and enhance their respective talent management systems by establishing the business case for talent management, defining, identifying, and developing high-potential leaders, carefully communicating high-potential designations, and evaluating talent management outcomes.

  6. A strategic plan for the second phase (2013-2015) of the Korea biobank project.

    PubMed

    Park, Ok; Cho, Sang Yun; Shin, So Youn; Park, Jae-Sun; Kim, Jun Woo; Han, Bok-Ghee

    2013-04-01

    The Korea Biobank Project (KBP) was led by the Ministry of Health and Welfare to establish a network between the National Biobank of Korea and biobanks run by university-affiliated general hospitals (regional biobanks). The Ministry of Health and Welfare started the project to enhance medical and health technology by collecting, managing, and providing researchers with high-quality human bioresources. The National Biobank of Korea, under the leadership of the Ministry of Health and Welfare, collects specimens through various cohorts and regional biobanks within university hospitals gather specimens from patients. The project began in 2008, and the first phase ended in 2012, which meant that there needed to be a plan for the second phase that begins in 2013. Consequently, professionals from within and outside the project were gathered to develop a plan for the second phase. Under the leadership of the planning committee, six working groups were formed to formulate a practical plan. By conducting two workshops with experts in the six working groups and the planning committee and three forums in 2011 and 2012, they have developed a strategic plan for the second phase of the KBP. This document presents a brief report of the second phase of the project based on a discussion with them. During the first phase of the project (2008-2012), a network was set up between the National Biobank of Korea and 17 biobanks at university-affiliated hospitals in an effort to unify informatics and governance among the participating biobanks. The biobanks within the network manage data on their biospecimens with a unified Biobank Information Management System. Continuous efforts are being made to develop a common standard operating procedure for resource collection, management, distribution, and personal information security, and currently, management of these data is carried out in a somewhat unified manner. In addition, the KBP has trained and educated professionals to work within the biobanks, and has also carried out various publicity promotions to the public and researchers. During the first phase, biospecimens from more than 300,000 participants through various cohorts and biospecimens from more than 200,000 patients from hospitals were collected, which were distributed to approximately 600 research projects. The planning committee for the second phase evaluated that the first phase of the KBP was successful. However, the first phase of the project was meant to allow autonomy to the individual biobanks. The biobanks were able to choose the kind of specimens they were going to collect and the amount of specimen they would set as a goal, as well as being allowed to choose their own methods to manage their biobanks (autonomy). Therefore, some biobanks collected resources that were easy to collect and the resources needed by researchers were not strategically collected. In addition, there was also a low distribution rate to researchers outside of hospitals, who do not have as much access to specimens and cases as those in hospitals. There were also many cases in which researchers were not aware of the KBP, and the distribution processes were not set up to be convenient to the demands of researchers. Accordingly, the second phase of the KBP will be focused on increasing the integration and cooperation between the biobanks within the network. The KBP plans to set goals for the strategic collection of the needed human bioresources. Although the main principle of the first phase was to establish infrastructure and resource collection, the key objective of the second phase is the efficient utilization of gathered resources. In order to fully utilize the gathered resources in an efficient way, distribution systems and policies must be improved. Vitalization of distribution, securing of high-value resource and related clinical and laboratory information, international standardization of resource management systems, and establishment of a virtuous cycle between research and development (R&D) and biobanks are the four main strategies. Based on these strategies, 12 related objectives have been set and are planned to be executed.

  7. The Parable of the Boiled Safety Professional

    NASA Technical Reports Server (NTRS)

    Shivers, Charles H.

    2011-01-01

    Common and unique issues contribute to system failures. This paper touches on the concept of drift to failure as a cautionary message. Managers and leaders, design team members, fabricators and assemblers, analysis and assurance personnel, and others associated with operating and maintaining systems, need to pay attention to identify the manifestation of individual and collective behaviors that might indicate slips in rigor or focus or decisions that might eat away at safety margins as our system drifts to failure. Corrections to drift made during design and development phases may efficiently prevent or mitigate drift problems occurring in the operational phase.

  8. Thermal Management Tools for Propulsion System Trade Studies and Analysis

    NASA Technical Reports Server (NTRS)

    McCarthy, Kevin; Hodge, Ernie

    2011-01-01

    Energy-related subsystems in modern aircraft are more tightly coupled with less design margin. These subsystems include thermal management subsystems, vehicle electric power generation and distribution, aircraft engines, and flight control. Tighter coupling, lower design margins, and higher system complexity all make preliminary trade studies difficult. A suite of thermal management analysis tools has been developed to facilitate trade studies during preliminary design of air-vehicle propulsion systems. Simulink blocksets (from MathWorks) for developing quasi-steady-state and transient system models of aircraft thermal management systems and related energy systems have been developed. These blocksets extend the Simulink modeling environment in the thermal sciences and aircraft systems disciplines. The blocksets include blocks for modeling aircraft system heat loads, heat exchangers, pumps, reservoirs, fuel tanks, and other components at varying levels of model fidelity. The blocksets have been applied in a first-principles, physics-based modeling and simulation architecture for rapid prototyping of aircraft thermal management and related systems. They have been applied in representative modern aircraft thermal management system studies. The modeling and simulation architecture has also been used to conduct trade studies in a vehicle level model that incorporates coupling effects among the aircraft mission, engine cycle, fuel, and multi-phase heat-transfer materials.

  9. Definition of two-phase flow behaviors for spacecraft design

    NASA Technical Reports Server (NTRS)

    Reinarts, Thomas R.; Best, Frederick R.; Miller, Katherine M.; Hill, Wayne S.

    1991-01-01

    Two-phase flow, thermal management systems are currently being considered as an alternative to conventional, single phase systems for future space missions because of their potential to reduce overall system mass, size, and pumping power requirements. Knowledge of flow regime transitions, heat transfer characteristics, and pressure drop correlations is necessary to design and develop two-phase systems. A boiling and condensing experiment was built in which R-12 was used as the working fluid. A two-phase pump was used to circulate a freon mixture and allow separate measurements of the vapor and liquid flow streams. The experimental package was flown five times aboard the NASA KC-135 aircraft which simulates zero-g conditions by its parabolic flight trajectory. Test conditions included stratified and annual flow regimes in 1-g which became bubbly, slug, or annular flow regimes on 0-g. A portion of this work is the analysis of adiabatic flow regimes. The superficial velocities of liquid and vapor have been obtained from the measured flow rates and are presented along with the observed flow regimes.

  10. A Taxonomy of Factors to Promote Quality Web-Supported Learning

    ERIC Educational Resources Information Center

    Fresen, Jill

    2007-01-01

    This article reports on a case study of the e-learning production unit at the University of Pretoria, South Africa. Phase 1 of the study, completed in 2003, was the design and development of a process-based quality management system for web-supported learning (WSL) using a basic ISO 9000 approach (University of Pretoria, 2003). The second phase,…

  11. The Phases and Paradoxes of Educational Quality Assurance: The Case of the Singapore Education System

    ERIC Educational Resources Information Center

    Ng, Pak Tee

    2008-01-01

    Purpose: The purpose of this paper is to highlight three important insights into educational quality assurance, using Singapore as a case study. It is useful to policy makers and practitioners to understand the phases and paradoxes in their educational quality assurance journey so that they may recognise and manage better the complex dynamics of…

  12. Sub-nanosecond clock synchronization and trigger management in the nuclear physics experiment AGATA

    NASA Astrophysics Data System (ADS)

    Bellato, M.; Bortolato, D.; Chavas, J.; Isocrate, R.; Rampazzo, G.; Triossi, A.; Bazzacco, D.; Mengoni, D.; Recchia, F.

    2013-07-01

    The new-generation spectrometer AGATA, the Advanced GAmma Tracking Array, requires sub-nanosecond clock synchronization among readout and front-end electronics modules that may lie hundred meters apart. We call GTS (Global Trigger and Synchronization System) the infrastructure responsible for precise clock synchronization and for the trigger management of AGATA. It is made of a central trigger processor and nodes, connected in a tree structure by means of optical fibers operated at 2Gb/s. The GTS tree handles the synchronization and the trigger data flow, whereas the trigger processor analyses and eventually validates the trigger primitives centrally. Sub-nanosecond synchronization is achieved by measuring two different types of round-trip times and by automatically correcting for phase-shift differences. For a tree of depth two, the peak-to-peak clock jitter at each leaf is 70 ps; the mean phase difference is 180 ps, while the standard deviation over such phase difference, namely the phase equalization repeatability, is 20 ps. The GTS system has run flawlessly for the two-year long AGATA campaign, held at the INFN Legnaro National Laboratories, Italy, where five triple clusters of the AGATA sub-array were coupled with a variety of ancillary detectors.

  13. Flow Boiling and Condensation Experiment (FBCE) for the International Space Station

    NASA Technical Reports Server (NTRS)

    Mudawar, Issam; O'Neill, Lucas; Hasan, Mohammad; Nahra, Henry; Hall, Nancy; Balasubramaniam, R.; Mackey, Jeffrey

    2016-01-01

    An effective means to reducing the size and weight of future space vehicles is to replace present mostly single-phase thermal management systems with two-phase counterparts. By capitalizing upon both latent and sensible heat of the coolant rather than sensible heat alone, two-phase thermal management systems can yield orders of magnitude enhancement in flow boiling and condensation heat transfer coefficients. Because the understanding of the influence of microgravity on two-phase flow and heat transfer is quite limited, there is an urgent need for a new experimental microgravity facility to enable investigators to perform long-duration flow boiling and condensation experiments in pursuit of reliable databases, correlations and models. This presentation will discuss recent progress in the development of the Flow Boiling and Condensation Experiment (FBCE) for the International Space Station (ISS) in collaboration between Purdue University and NASA Glenn Research Center. Emphasis will be placed on the design of the flow boiling module and on new flow boiling data that were measured in parabolic flight, along with extensive flow visualization of interfacial features at heat fluxes up to critical heat flux (CHF). Also discussed a theoretical model that will be shown to predict CHF with high accuracy.

  14. Design, Development, Testing, and Evaluation: Human Factors Engineering

    NASA Technical Reports Server (NTRS)

    Adelstein, Bernard; Hobbs, Alan; OHara, John; Null, Cynthia

    2006-01-01

    While human-system interaction occurs in all phases of system development and operation, this chapter on Human Factors in the DDT&E for Reliable Spacecraft Systems is restricted to the elements that involve "direct contact" with spacecraft systems. Such interactions will encompass all phases of human activity during the design, fabrication, testing, operation, and maintenance phases of the spacecraft lifespan. This section will therefore consider practices that would accommodate and promote effective, safe, reliable, and robust human interaction with spacecraft systems. By restricting this chapter to what the team terms "direct contact" with the spacecraft, "remote" factors not directly involved in the development and operation of the vehicle, such as management and organizational issues, have been purposely excluded. However, the design of vehicle elements that enable and promote ground control activities such as monitoring, feedback, correction and reversal (override) of on-board human and automation process are considered as per NPR8705.2A, Section 3.3.

  15. National best management practices monitoring summary report, program phase-in period fiscal years 2013-2014

    Treesearch

    Joan Carlson; Pam Edwards; Todd Ellsworth; Michael Eberle

    2015-01-01

    The National BMP Program provides National Core BMPs, standardized monitoring protocols to evaluate implementation and effectiveness of the National Core BMPs, and a data management system to store and analyze the resulting monitoring data. BMP evaluations are completed by interdisciplinary teams of resource specialists and include assessments of whether BMP...

  16. A Team Approach to Managing Technology: Despite Our Differences--We Had To Make IT Work!

    ERIC Educational Resources Information Center

    Giuliani, Peter R.

    Franklin University, a private urban university with 4500 students located in Columbus, Ohio, completed the initial phase of a long-range, campus-wide technology plan. The plan creates a well supported and managed computing and communications infrastructure focusing on: user support systems; classrooms and laboratories; offices; outside access;…

  17. Research to guide trail management at Acadia National Park, Maine

    Treesearch

    Kelly Goonan; Robert Manning; William Valliere

    2009-01-01

    Acadia National Park, Maine, is the tenth most-visited national park in the United States. Managers face the challenge of protecting the park's trail system from damage while maintaining a high quality recreation experience. For this study, an initial phase of research was conducted to identify potential indicators of quality for trail resources and the visitor...

  18. Distribution system model calibration with big data from AMI and PV inverters

    DOE PAGES

    Peppanen, Jouni; Reno, Matthew J.; Broderick, Robert J.; ...

    2016-03-03

    Efficient management and coordination of distributed energy resources with advanced automation schemes requires accurate distribution system modeling and monitoring. Big data from smart meters and photovoltaic (PV) micro-inverters can be leveraged to calibrate existing utility models. This paper presents computationally efficient distribution system parameter estimation algorithms to improve the accuracy of existing utility feeder radial secondary circuit model parameters. The method is demonstrated using a real utility feeder model with advanced metering infrastructure (AMI) and PV micro-inverters, along with alternative parameter estimation approaches that can be used to improve secondary circuit models when limited measurement data is available. Lastly, themore » parameter estimation accuracy is demonstrated for both a three-phase test circuit with typical secondary circuit topologies and single-phase secondary circuits in a real mixed-phase test system.« less

  19. Distribution system model calibration with big data from AMI and PV inverters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peppanen, Jouni; Reno, Matthew J.; Broderick, Robert J.

    Efficient management and coordination of distributed energy resources with advanced automation schemes requires accurate distribution system modeling and monitoring. Big data from smart meters and photovoltaic (PV) micro-inverters can be leveraged to calibrate existing utility models. This paper presents computationally efficient distribution system parameter estimation algorithms to improve the accuracy of existing utility feeder radial secondary circuit model parameters. The method is demonstrated using a real utility feeder model with advanced metering infrastructure (AMI) and PV micro-inverters, along with alternative parameter estimation approaches that can be used to improve secondary circuit models when limited measurement data is available. Lastly, themore » parameter estimation accuracy is demonstrated for both a three-phase test circuit with typical secondary circuit topologies and single-phase secondary circuits in a real mixed-phase test system.« less

  20. Space Station 20-kHz power management and distribution system

    NASA Technical Reports Server (NTRS)

    Hansen, Irving G.; Sundberg, Gale R.

    1986-01-01

    During the conceptual design phase a 20-kHz power distribution system was selected as the reference for the Space Station. The system is single-phase 400 VRMS, with a sinusoidal wave form. The initial user power level will be 75 kW with growth to 300 kW. The high-frequency system selection was based upon considerations of efficiency, weight, safety, ease of control, interface with computers, and ease of paralleling for growth. Each of these aspects will be discussed as well as the associated trade-offs involved. An advanced development program has been instituted to accelerate the maturation of the high-frequency system. Some technical aspects of the advanced development will be discussed.

  1. Space station 20-kHz power management and distribution system

    NASA Technical Reports Server (NTRS)

    Hansen, I. G.; Sundberg, G. R.

    1986-01-01

    During the conceptual design phase a 20-kHz power distribution system was selected as the reference for the space station. The system is single-phase 400 VRMS, with a sinusoidal wave form. The initial user power level will be 75 kW with growth to 300 kW. The high-frequency system selection was based upon considerations of efficiency, weight, safety, ease of control, interface with computers, and ease of paralleling for growth. Each of these aspects will be discussed as well as the associated trade-offs involved. An advanced development program has been instituted to accelerate the maturation of the high-frequency system. Some technical aspects of the advanced development will be discussed.

  2. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 1 : summary report.

    DOT National Transportation Integrated Search

    2009-12-01

    The Integrated Remote Sensing and Visualization System (IRSV) is being designed to accommodate the needs of todays Bridge : Engineers at the state and local level from the following aspects: : Better understanding and enforcement of a complex ...

  3. Waste flow analysis and life cycle assessment of integrated waste management systems as planning tools: Application to optimise the system of the City of Bologna.

    PubMed

    Tunesi, Simonetta; Baroni, Sergio; Boarini, Sandro

    2016-09-01

    The results of this case study are used to argue that waste management planning should follow a detailed process, adequately confronting the complexity of the waste management problems and the specificity of each urban area and of regional/national situations. To support the development or completion of integrated waste management systems, this article proposes a planning method based on: (1) the detailed analysis of waste flows and (2) the application of a life cycle assessment to compare alternative scenarios and optimise solutions. The evolution of the City of Bologna waste management system is used to show how this approach can be applied to assess which elements improve environmental performance. The assessment of the contribution of each waste management phase in the Bologna integrated waste management system has proven that the changes applied from 2013 to 2017 result in a significant improvement of the environmental performance mainly as a consequence of the optimised integration between materials and energy recovery: Global Warming Potential at 100 years (GWP100) diminishes from 21,949 to -11,169 t CO2-eq y(-1) and abiotic resources depletion from -403 to -520 t antimony-eq. y(-1) This study analyses at great detail the collection phase. Outcomes provide specific operational recommendations to policy makers, showing the: (a) relevance of the choice of the materials forming the bags for 'door to door' collection (for non-recycled low-density polyethylene bags 22 kg CO2-eq (tonne of waste)(-1)); (b) relatively low environmental impacts associated with underground tanks (3.9 kg CO2-eq (tonne of waste)(-1)); (c) relatively low impact of big street containers with respect to plastic bags (2.6 kg CO2-eq. (tonne of waste)(-1)). © The Author(s) 2016.

  4. Perceptions of risk, risk aversion, and barriers to adoption of decision support systems and integrated pest management: an introduction.

    PubMed

    Gent, David H; De Wolf, Erick; Pethybridge, Sarah J

    2011-06-01

    Rational management of plant diseases, both economically and environmentally, involves assessing risks and the costs associated with both correct and incorrect tactical management decisions to determine when control measures are warranted. Decision support systems can help to inform users of plant disease risk and thus assist in accurately targeting events critical for management. However, in many instances adoption of these systems for use in routine disease management has been perceived as slow. The under-utilization of some decision support systems is likely due to both technical and perception constraints that have not been addressed adequately during development and implementation phases. Growers' perceptions of risk and their aversion to these perceived risks can be reasons for the "slow" uptake of decision support systems and, more broadly, integrated pest management (IPM). Decision theory provides some tools that may assist in quantifying and incorporating subjective and/or measured probabilities of disease occurrence or crop loss into decision support systems. Incorporation of subjective probabilities into IPM recommendations may be one means to reduce grower uncertainty and improve trust of these systems because management recommendations could be explicitly informed by growers' perceptions of risk and economic utility. Ultimately though, we suggest that an appropriate measure of the value and impact of decision support systems is grower education that enables more skillful and informed management decisions independent of consultation of the support tool outputs.

  5. Wave transmission approach based on modal analysis for embedded mechanical systems

    NASA Astrophysics Data System (ADS)

    Cretu, Nicolae; Nita, Gelu; Ioan Pop, Mihail

    2013-09-01

    An experimental method for determining the phase velocity in small solid samples is proposed. The method is based on measuring the resonant frequencies of a binary or ternary solid elastic system comprising the small sample of interest and a gauge material of manageable size. The wave transmission matrix of the combined system is derived and the theoretical values of its eigenvalues are used to determine the expected eigenfrequencies that, equated with the measured values, allow for the numerical estimation of the phase velocities in both materials. The known phase velocity of the gauge material is then used to asses the accuracy of the method. Using computer simulation and the experimental values for phase velocities, the theoretical values for the eigenfrequencies of the eigenmodes of the embedded elastic system are obtained, to validate the method. We conclude that the proposed experimental method may be reliably used to determine the elastic properties of small solid samples whose geometries do not allow a direct measurement of their resonant frequencies.

  6. Total On-line Access Data System (TOADS): Phase II Final Report for the Period August 2002 - August 2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuracko, K. L.; Parang, M.; Landguth, D. C.

    2004-09-13

    TOADS (Total On-line Access Data System) is a new generation of real-time monitoring and information management system developed to support unattended environmental monitoring and long-term stewardship of U.S. Department of Energy facilities and sites. TOADS enables project managers, regulators, and stakeholders to view environmental monitoring information in realtime over the Internet. Deployment of TOADS at government facilities and sites will reduce the cost of monitoring while increasing confidence and trust in cleanup and long term stewardship activities. TOADS: Reliably interfaces with and acquires data from a wide variety of external databases, remote systems, and sensors such as contaminant monitors, areamore » monitors, atmospheric condition monitors, visual surveillance systems, intrusion devices, motion detectors, fire/heat detection devices, and gas/vapor detectors; Provides notification and triggers alarms as appropriate; Performs QA/QC on data inputs and logs the status of instruments/devices; Provides a fully functional data management system capable of storing, analyzing, and reporting on data; Provides an easy-to-use Internet-based user interface that provides visualization of the site, data, and events; and Enables the community to monitor local environmental conditions in real time. During this Phase II STTR project, TOADS has been developed and successfully deployed for unattended facility, environmental, and radiological monitoring at a Department of Energy facility.« less

  7. First Experiences with CMS Data Storage on the GEMSS System at the INFN-CNAF Tier-1

    NASA Astrophysics Data System (ADS)

    Andreotti, D.; Bonacorsi, D.; Cavalli, A.; Pra, S. Dal; Dell'Agnello, L.; Forti, Alberto; Grandi, C.; Gregori, D.; Gioi, L. Li; Martelli, B.; Prosperini, A.; Ricci, P. P.; Ronchieri, Elisabetta; Sapunenko, V.; Sartirana, A.; Vagnoni, V.; Zappi, Riccardo

    A brand new Mass Storage System solution called "Grid-Enabled Mass Storage System" (GEMSS) -based on the Storage Resource Manager (StoRM) developed by INFN, on the General Parallel File System by IBM and on the Tivoli Storage Manager by IBM -has been tested and deployed at the INFNCNAF Tier-1 Computing Centre in Italy. After a successful stress test phase, the solution is now being used in production for the data custodiality of the CMS experiment at CNAF. All data previously recorded on the CASTOR system have been transferred to GEMSS. As final validation of the GEMSS system, some of the computing tests done in the context of the WLCG "Scale Test for the Experiment Program" (STEP'09) challenge were repeated in September-October 2009 and compared with the results previously obtained with CASTOR in June 2009. In this paper, the GEMSS system basics, the stress test activity and the deployment phase -as well as the reliability and performance of the system -are overviewed. The experiences in the use of GEMSS at CNAF in preparing for the first months of data taking of the CMS experiment at the Large Hadron Collider are also presented.

  8. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonnal, P.; Féral, B.; Kershaw, K.

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies andmore » development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.« less

  9. Two-phase nanofluid-based thermal management systems for LED cooling

    NASA Astrophysics Data System (ADS)

    Kiseev, V.; Aminev, D.; Sazhin, O.

    2017-04-01

    This research focuses on two-phase thermal control systems, namely loop thermosyphons (LTS) filled with nanofluids, and their use as LED cooling devices. The behavior of the fluid in the thermosyphons and the mechanisms explaining the possible impact of nanoparticles on thermal properties of the working fluid as well as the processes in the LTS are addressed. Nanoparticle distribution in the nanofluid, methods of preparation of nanofluids and nanofluid degradation processes (aging) are studied. The results are obtained from a set of experiments on thermosyphon characteristics depending on the thermophysical properties of the working fluid, filling volume, geometry and materials of radiators. The impact of nanofluids on heat-transfer process occurring inside thermosyphon is also studied. Results indicate strong influence of nanoparticles on the thermal properties of the thermosyphons, with up to 20% increase of the heat transfer coefficient. Additionally, a method of calculating the hydrodynamic limit of the LTS is proposed, which allows for estimation of the maximum heat flux that can be transferred by means of the LTS. Possible ways for further improvement of the model are proposed. The nanofluids are shown to be effective means of enhancing two-phase systems of thermal management.

  10. Evaluation of a novel closed-loop fluid-administration system based on dynamic predictors of fluid responsiveness: an in silico simulation study.

    PubMed

    Rinehart, Joseph; Alexander, Brenton; Le Manach, Yannick; Hofer, Christoph; Tavernier, Benoit; Kain, Zeev N; Cannesson, Maxime

    2011-01-01

    Dynamic predictors of fluid responsiveness have made automated management of fluid resuscitation more practical. We present initial simulation data for a novel closed-loop fluid-management algorithm (LIR, Learning Intravenous Resuscitator). The performance of the closed-loop algorithm was tested in three phases by using a patient simulator including a pulse-pressure variation output. In the first phase, LIR was tested in three different hemorrhage scenarios and compared with no management. In the second phase, we compared LIR with 20 practicing anesthesiologists for the management of a simulated hemorrhage scenario. In the third phase, LIR was tested under conditions of noise and artifact in the dynamic predictor. In the first phase, we observed a significant difference between the unmanaged and the LIR groups in moderate to large hemorrhages in heart rate (76 ± 8 versus 141 ± 29 beats/min), mean arterial pressure (91 ± 6 versus 59 ± 26 mm Hg), and cardiac output (CO; (6.4 ± 0.9 versus 3.2 ± 1.8 L/min) (P < 0.005 for all comparisons). In the second phase, LIR intervened significantly earlier than the practitioners (16.0 ± 1.3 minutes versus 21.5 ± 5.6 minutes; P < 0.05) and gave more total fluid (2,675 ± 244 ml versus 1,968 ± 644 ml; P < 0.05). The mean CO was higher in the LIR group than in the practitioner group (5.9 ± 0.2 versus 5.2 ± 0.6 L/min; P < 0.05). Finally, in the third phase, despite the addition of noise to the pulse-pressure variation value, no significant difference was found across conditions in mean, final, or minimum CO. These data demonstrate that LIR is an effective volumetric resuscitator in simulated hemorrhage scenarios and improved physician management of the simulated hemorrhages.

  11. The Mayo Clinic Value Creation System.

    PubMed

    Swensen, Stephen J; Dilling, James A; Harper, C Michel; Noseworthy, John H

    2012-01-01

    The authors present Mayo Clinic's Value Creation System, a coherent systems engineering approach to delivering a single high-value practice. There are 4 tightly linked, interdependent phases of the system: alignment, discovery, managed diffusion, and measurement. The methodology is described and examples of the results to date are presented. The Value Creation System has been demonstrated to improve the quality of patient care while reducing costs and increasing productivity.

  12. Design of a K-Band Transmit Phased Array For Low Earth Orbit Satellite Communications

    NASA Technical Reports Server (NTRS)

    Watson, Thomas; Miller, Stephen; Kershner, Dennis; Anzic, Godfrey

    2000-01-01

    The design of a light weight, low cost phased array antenna is presented. Multilayer printed wiring board (PWB) technology is utilized for Radio Frequencies (RF) and DC/Logic manifold distribution. Transmit modules are soldered on one side and patch antenna elements are on the other, allowing the use of automated assembly processes. The 19 GHz antenna has two independently steerable beams, each capable of transferring data at 622 Mbps. A passive, self-contained phase change thermal management system is also presented.

  13. Modular space station phase B extension preliminary systems design report. Volume 6: Trades and analyses

    NASA Technical Reports Server (NTRS)

    Jones, A. L.

    1972-01-01

    Requirements and concepts and the tradeoff analysis leading to the preferred concept are presented. Integrated analyses are given for subsystems and thermal control. Specific tradeoffs and analyses are also given for water management, atmosphere control, energy storage, radiators, navigation, control moment gyros, and system maintenance. The analyses of manipulator concepts and requirements, and supplemental analyses of information management issues are summarized. Subsystem reliability analyses include a detailed discussion of the critical failure analysis.

  14. Human Resources in the Library System. Course 2, Leader's Handbook, Part 1: Designs for Learning. Final Report, Phase 2, Post-Master's Education for Middle and Upper-Level Personnel in Libraries and Information Centers.

    ERIC Educational Resources Information Center

    Goodman, Charles H.; Stone, Elizabeth W.

    A leader's handbook is presented for a course designed for the continuing education of professional librarians at the level of middle or upper management who find that they need understanding about human resources in the library system beyond that acquired on the job or in previous library education. The course has four units: (1) Management: A…

  15. Improving customer satisfaction: emerging lessons about strategy and implementation, Part 2.

    PubMed

    Morton, J

    1995-01-01

    This article describes a six-phase strategy designed to systematically improve customer satisfaction across an entire managed care system. Part 1 (Spring 1995) of this two-part series summarized the theoretical underpinnings of the approach and highlighted the first two phases of the improvement strategy. Those phases involve systematically listening to the organization's customers and using customer information to strategically target key areas for improvement. This article describes the specifics of the last four phases of the strategy; these phases involve achieving and sustaining unprecedented levels of improvement in targeted areas. Initial results and emerging lessons associated with the implementation of this strategy are summarized.

  16. CO2 evaporative cooling: The future for tracking detector thermal management

    NASA Astrophysics Data System (ADS)

    Tropea, P.; Daguin, J.; Petagna, P.; Postema, H.; Verlaat, B.; Zwalinski, L.

    2016-07-01

    In the last few years, CO2 evaporative cooling has been one of the favourite technologies chosen for the thermal management of tracking detectors at LHC. ATLAS Insertable B-Layer and CMS Pixel phase 1 upgrade have adopted it and their systems are now operational or under commissioning. The CERN PH-DT team is now merging the lessons learnt on these two systems in order to prepare the design and construction of the cooling systems for the new Upstream Tracker and the Velo upgrade in LHCb, due by 2018. Meanwhile, the preliminary design of the ATLAS and CMS full tracker upgrades is started, and both concepts heavily rely on CO2 evaporative cooling. This paper highlights the performances of the systems now in operation and the challenges to overcome in order to scale them up to the requirements of the future generations of trackers. In particular, it focuses on the conceptual design of a new cooling system suited for the large phase 2 upgrade programmes, which will be validated with the construction of a common prototype in the next years.

  17. An investigation of two phase flow pressure drops in a reduced acceleration environment

    NASA Astrophysics Data System (ADS)

    Wheeler, Montgomery W.; Best, Frederick R.; Reinarts, Thomas R.

    1993-01-01

    Thermal systems for space applications based on two phase flow have several advantages over single phase systems. Two phase thermal energy management and dynamic power conversion system advantages include the capability of achieving high specific power levels. Before two phase systems for space applications can be designed effectively, knowledge of the flow behavior in a reduced acceleration environment is necessary. To meet these needs, two phase flow experiments were conducted aboard the National Aeronautic and Space Administration's KC-135 using R12 as the working fluid. Annular flow two phase pressure drops were measured through 10.41-mm ID 1.251-m long glass tubing during periods with acceleration levels in the range ±0.05 G. The experiments were conducted with emphasis on achieving data with a high level of accuracy. The reduced acceleration annular flow pressure drops were compred with pressure drops measured in a 1-G environment for similar flow conditions. The reduced acceleration pressure drops were found to be 45% greater than the 1-G pressure drops. In addition, the reduced acceleration annular flow interfacial friction factors were compared with models for vertical up-flow in a 1-G environment. The reduced acceleration interfacial friction factor data was not predicted by the 1-G models.

  18. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our work and results may be outdated when this paper is published.

  19. Development of a DC-DC conversion powering scheme for the CMS Phase-1 pixel upgrade

    NASA Astrophysics Data System (ADS)

    Feld, L.; Fimmers, C.; Karpinski, W.; Klein, K.; Lipinski, M.; Preuten, M.; Rauch, M.; Rittich, D.; Sammet, J.; Wlochal, M.

    2014-01-01

    A novel powering scheme based on the DC-DC conversion technique will be exploited to power the CMS Phase-1 pixel detector. DC-DC buck converters for the CMS pixel project have been developed, based on the AMIS5 ASIC designed by CERN. The powering system of the Phase-1 pixel detector is described and the performance of the converter prototypes is detailed, including power efficiency, stability of the output voltage, shielding, and thermal management. Results from a test of the magnetic field tolerance of the DC-DC converters are reported. System tests with pixel modules using many components of the future pixel barrel system are summarized. Finally first impressions from a pre-series of 200 DC-DC converters are presented.

  20. Data Management for Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Snyder, Joseph F.; Smyth, David E.

    2004-01-01

    Data Management for the Mars Exploration Rovers (MER) project is a comprehensive system addressing the needs of development, test, and operations phases of the mission. During development of flight software, including the science software, the data management system can be simulated using any POSIX file system. During testing, the on-board file system can be bit compared with files on the ground to verify proper behavior and end-to-end data flows. During mission operations, end-to-end accountability of data products is supported, from science observation concept to data products within the permanent ground repository. Automated and human-in-the-loop ground tools allow decisions regarding retransmitting, re-prioritizing, and deleting data products to be made using higher level information than is available to a protocol-stack approach such as the CCSDS File Delivery Protocol (CFDP).

  1. Satellite Application for Disaster Management Information Systems

    NASA Astrophysics Data System (ADS)

    Okpanachi, George

    Abstract Satellites are becoming increasingly vital to modern day disaster management activities. Earth observation (EO) satellites provide images at various wavelengths that assist rapid-mapping in all phases of the disaster management cycle: mitigation of potential risks in a given area, preparedness for eventual disasters, immediate response to a disaster event, and the recovery/reconstruction efforts follo wing it. Global navigation satellite systems (GNSS) such as the Global Positioning System (GPS) assist all the phases by providing precise location and navigation data, helping manage land and infrastructures, and aiding rescue crews coordinate their search efforts. Effective disaster management is a complex problem, because it involves many parameters, which are usually not easy to measure and even identify: Analysis of current situation, planning, optimum resource management, coordination, controlling and monitoring current activities and making quick and correct decisions are only some of these parameters, whose complete list is very long. Disaster management information systems (DMIS) assist disaster management to analyse the situation better, make decisions and suggest further actions following the emergency plans. This requires not only fast and thorough processing and optimization abilities, but also real-time data provided to the DMIS. The need of DMIS for disaster’s real-time data can be satisfied by small satellites data utilization. Small satellites can provide up-to-data, plus a better media to transfer data. This paper suggests a rationale and a framework for utilization of small Satellite data by DMIS. DMIS should be used ‘’before’’, ‘’during’’ and ‘’after’’ the disasters. Data provided by the Small Satellites are almost crucial in any period of the disasters, because early warning can save lives, and satellite data may help to identify disasters before they occur. The paper also presents’ ‘when’’, ‘’where’’ and ‘’how’’ small satellite data should be used by DMIS.

  2. Development of a prototype two-phase thermal bus system for Space Station

    NASA Technical Reports Server (NTRS)

    Myron, D. L.; Parish, R. C.

    1987-01-01

    This paper describes the basic elements of a pumped two-phase ammonia thermal control system designed for microgravity environments, the development of the concept into a Space Station flight design, and design details of the prototype to be ground-tested in the Johnson Space Center (JSC) Thermal Test Bed. The basic system concept is one of forced-flow heat transport through interface heat exchangers with anhydrous ammonia being pumped by a device expressly designed for two-phase fluid management in reduced gravity. Control of saturation conditions, and thus system interface temperatures, is accomplished with a single central pressure regulating valve. Flow control and liquid inventory are controlled by passive, nonelectromechanical devices. Use of these simple control elements results in minimal computer controls and high system reliability. Building on the basic system concept, a brief overview of a potential Space Station flight design is given. Primary verification of the system concept will involve testing at JSC of a 25-kW ground test article currently in fabrication.

  3. Phase II : operational and safety-based analyses of varied toll lane configurations.

    DOT National Transportation Integrated Search

    2016-08-01

    The Puerto Rico Dynamic Toll Lane (DTL) is a 6.44 mi (10.4 km) reversible facility within a stretch of freeway PR-22 that operates a congestion pricing system; the first of its kind in the Commonwealth of Puerto Rico. This managed lane system is shar...

  4. GASB Statement 34 compliance : development of a fixed asset (infrastructure) MIS, Phase 1 for the Alabama Department of Transportation

    DOT National Transportation Integrated Search

    2002-01-02

    This project defined the scope, goals, and high-level requirements for the Alabama Department of Transportation's Asset Management System, so that it will comply with the General Accounting Standards Board policy 34. The system will provide a network...

  5. Mineralizing urban net-zero water treatment: Phase II field results and design recommendations

    EPA Science Inventory

    Net-zero water (NZW) systems, or water management systems achieving high recycling rates and low residuals generation so as to avoid water import and export, can also conserve energy used to heat and convey water, while economically restoring local eco-hydrology. However, design ...

  6. A Save-Energy, Save-Money Program That Pays Off

    ERIC Educational Resources Information Center

    Embersits, John F.

    1976-01-01

    Suggested guidelines for energy saving on campus include a 3-phase plan: (1) Quick Fix--effective management of what you already have; (2) Refitting--modification of existing systems and installation of simple controls; (3) Systems Convert--installation of computerized controls, waste-heat recovery, solid-waste recovery utilization and other…

  7. Life cycle costing of food waste: A review of methodological approaches.

    PubMed

    De Menna, Fabio; Dietershagen, Jana; Loubiere, Marion; Vittuari, Matteo

    2018-03-01

    Food waste (FW) is a global problem that is receiving increasing attention due to its environmental and economic impacts. Appropriate FW prevention, valorization, and management routes could mitigate or avoid these effects. Life cycle thinking and approaches, such as life cycle costing (LCC), may represent suitable tools to assess the sustainability of these routes. This study analyzes different LCC methodological aspects and approaches to evaluate FW management and valorization routes. A systematic literature review was carried out with a focus on different LCC approaches, their application to food, FW, and waste systems, as well as on specific methodological aspects. The review consisted of three phases: a collection phase, an iterative phase with experts' consultation, and a final literature classification. Journal papers and reports were retrieved from selected databases and search engines. The standardization of LCC methodologies is still in its infancy due to a lack of consensus over definitions and approaches. Research on the life cycle cost of FW is limited and generally focused on FW management, rather than prevention or valorization of specific flows. FW prevention, valorization, and management require a consistent integration of LCC and Life Cycle Assessment (LCA) to avoid tradeoffs between environmental and economic impacts. This entails a proper investigation of methodological differences between attributional and consequential modelling in LCC, especially with regard to functional unit, system boundaries, multi-functionality, included cost, and assessed impacts. Further efforts could also aim at finding the most effective and transparent categorization of costs, in particular when dealing with multiple stakeholders sustaining costs of FW. Interpretation of results from LCC of FW should take into account the effect on larger economic systems. Additional key performance indicators and analytical tools could be included in consequential approaches. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  8. Measurement of time delay for a prospectively gated CT simulator.

    PubMed

    Goharian, M; Khan, R F H

    2010-04-01

    For the management of mobile tumors, respiratory gating is the ideal option, both during imaging and during therapy. The major advantage of respiratory gating during imaging is that it is possible to create a single artifact-free CT data-set during a selected phase of the patient's breathing cycle. The purpose of the present work is to present a simple technique to measure the time delay during acquisition of a prospectively gated CT. The time delay of a Philips Brilliance BigBore (Philips Medical Systems, Madison, WI) scanner attached to a Varian Real-Time Position Management (RPM) system (Varian Medical Systems, Palo Alto, CA) was measured. Two methods were used to measure the CT time delay: using a motion phantom and using a recorded data file from the RPM system. In the first technique, a rotating wheel phantom was altered by placing two plastic balls on its axis and rim, respectively. For a desired gate, the relative positions of the balls were measured from the acquired CT data and converted into corresponding phases. Phase difference was calculated between the measured phases and the desired phases. Using period of motion, the phase difference was converted into time delay. The Varian RPM system provides an external breathing signal; it also records transistor-transistor logic (TTL) 'X-Ray ON' status signal from the CT scanner in a text file. The TTL 'X-Ray ON' indicates the start of CT image acquisition. Thus, knowledge of the start time of CT acquisition, combined with the real-time phase and amplitude data from the external respiratory signal, provides time-stamping of all images in an axial CT scan. The TTL signal with time-stamp was used to calculate when (during the breathing cycle) a slice was recorded. Using the two approaches, the time delay between the prospective gating signal and CT simulator has been determined to be 367 +/- 40 ms. The delay requires corrections both at image acquisition and while setting gates for the treatment delivery; otherwise the simulation and treatment may not be correlated with the patient's breathing.

  9. ACE: A distributed system to manage large data archives

    NASA Technical Reports Server (NTRS)

    Daily, Mike I.; Allen, Frank W.

    1993-01-01

    Competitive pressures in the oil and gas industry are requiring a much tighter integration of technical data into E and P business processes. The development of new systems to accommodate this business need must comprehend the significant numbers of large, complex data objects which the industry generates. The life cycle of the data objects is a four phase progression from data acquisition, to data processing, through data interpretation, and ending finally with data archival. In order to implement a cost effect system which provides an efficient conversion from data to information and allows effective use of this information, an organization must consider the technical data management requirements in all four phases. A set of technical issues which may differ in each phase must be addressed to insure an overall successful development strategy. The technical issues include standardized data formats and media for data acquisition, data management during processing, plus networks, applications software, and GUI's for interpretation of the processed data. Mass storage hardware and software is required to provide cost effective storage and retrieval during the latter three stages as well as long term archival. Mobil Oil Corporation's Exploration and Producing Technical Center (MEPTEC) has addressed the technical and cost issues of designing, building, and implementing an Advanced Computing Environment (ACE) to support the petroleum E and P function, which is critical to the corporation's continued success. Mobile views ACE as a cost effective solution which can give Mobile a competitive edge as well as a viable technical solution.

  10. Short-term hydro generation and interchange contract scheduling for Swiss Rail

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Christoforidis, M.; Awobamise, B.; Tong, S.

    This paper describes the Short-Term Resource Scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) Energy Management System. Optimal scheduling of the single-phase hydro plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and regulating reserve requirements), is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment.

  11. Evaluation of supercritical cryogen storage and transfer systems for future NASA missions

    NASA Technical Reports Server (NTRS)

    Arif, Hugh; Aydelott, John C.; Chato, David J.

    1990-01-01

    Conceptual designs of Space Transportation Vehicles (STV), and their orbital servicing facilities, that utilize supercritical, single phase, cryogenic propellant were established and compared with conventional subcritical, two phases, STV concepts. The analytical study was motivated by the desire to avoid fluid management problems associated with the storage, acquisition and transfer of subcritical liquid oxygen and hydrogen propellants in the low gravity environment of space. Although feasible, the supercritical concepts suffer from STV weight penalties and propellant resupply system power requirements which make the concepts impractical.

  12. Evaluation of supercritical cryogen storage and transfer systems for future NASA missions

    NASA Technical Reports Server (NTRS)

    Arif, Hugh; Aydelott, John C.; Chato, David J.

    1989-01-01

    Conceptual designs of Space Transportation Vehicles (STV), and their orbital servicing facilities, that utilize supercritical, single phase, cryogenic propellants were established and compared with conventional subcritical, two phase, STV concepts. The analytical study was motivated by the desire to avoid fluid management problems associated with the storage, acquisition and transfer of subcritical liquid oxygen and hydrogen propellants in the low gravity environment of space. Although feasible, the supercritical concepts suffer from STV weight penalties and propellant resupply system power requirements which make the concepts impractical.

  13. An operational model for mainstreaming ecosystem services for implementation

    PubMed Central

    Cowling, Richard M.; Egoh, Benis; Knight, Andrew T.; O'Farrell, Patrick J.; Reyers, Belinda; Rouget, Mathieu; Roux, Dirk J.; Welz, Adam; Wilhelm-Rechman, Angelika

    2008-01-01

    Research on ecosystem services has grown markedly in recent years. However, few studies are embedded in a social process designed to ensure effective management of ecosystem services. Most research has focused only on biophysical and valuation assessments of putative services. As a mission-oriented discipline, ecosystem service research should be user-inspired and user-useful, which will require that researchers respond to stakeholder needs from the outset and collaborate with them in strategy development and implementation. Here we provide a pragmatic operational model for achieving the safeguarding of ecosystem services. The model comprises three phases: assessment, planning, and management. Outcomes of social, biophysical, and valuation assessments are used to identify opportunities and constraints for implementation. The latter then are transformed into user-friendly products to identify, with stakeholders, strategic objectives for implementation (the planning phase). The management phase undertakes and coordinates actions that achieve the protection of ecosystem services and ensure the flow of these services to beneficiaries. This outcome is achieved via mainstreaming, or incorporating the safeguarding of ecosystem services into the policies and practices of sectors that deal with land- and water-use planning. Management needs to be adaptive and should be institutionalized in a suite of learning organizations that are representative of the sectors that are concerned with decision-making and planning. By following the phases of our operational model, projects for safeguarding ecosystem services are likely to empower stakeholders to implement effective on-the-ground management that will achieve resilience of the corresponding social-ecological systems. PMID:18621695

  14. Controls for Reusable Launch Vehicles During Terminal Area Energy Management

    NASA Technical Reports Server (NTRS)

    Driessen, Brian J.

    2005-01-01

    During the terminal energy management phase of flight (last of three phases) for a reusable launch vehicle, it is common for the controller to receive guidance commands specifying desired values for (i) the roll angle roll q(sub roll), (ii) the acceleration a(sub n) in the body negative z direction, -k(sub A)-bar, and (iii) omega(sub 3), the projection of onto the body-fixed axis k(sub A)-bar, is always indicated by guidance to be zero. The objective of the controller is to regulate the actual values of these three quantities, i.e make them close to the commanded values, while maintaining system stability.

  15. Satellite Power System (SPS) financial/management scenarios

    NASA Technical Reports Server (NTRS)

    Vajk, J. P.

    1978-01-01

    The possible benefits of a Satellite Power System (SPS) program, both domestically and internationally, justify detailed and imaginative investigation of the issues involved in financing and managing such a large-scale program. In this study, ten possible methods of financing a SPS program are identified ranging from pure government agency to private corporations. The following were analyzed and evaluated: (1) capital requirements for SPS; (2) ownership and control; (3) management principles; (4) organizational forms for SPS; (5) criteria for evaluation; (6) detailed description and preliminary evaluation of alternatives; (7) phased approaches; and (8) comparative evaluation. Key issues and observations and recommendations for further study are also presented.

  16. An Assessment of Feedback Procedures and Information Provided to Instructors within Computer Managed Learning Environments--Implications for Instruction and Software Redesign.

    ERIC Educational Resources Information Center

    Kotesky, Arturo A.

    Feedback procedures and information provided to instructors within computer managed learning environments were assessed to determine current usefulness and meaningfulness to users, and to present the design of a different instructor feedback instrument. Kaufman's system model was applied to accomplish the needs assessment phase of the study; and…

  17. Making Quality Happen: How Training Can Turn Strategy into Real Improvement. The Jossey-Bass Management Series.

    ERIC Educational Resources Information Center

    Cocheu, Ted

    This book, written by an organizational development director and consultant in the fields of quality improvement, management, and design of training systems to Fortune 500 clients, offers a six-step improvement strategy and a six-phase training curriculum that can be adapted to the needs of companies in various fields. Seven chapters present ideas…

  18. Phase 1 Development Report for the SESSA Toolkit

    DTIC Science & Technology

    2014-09-01

    data acquisition, data management, and data analysis. SESSA was designed to meet forensic crime scene needs as defined by the DoD’s Military Criminal...on the design , functional attributes, algorithm development, system architecture, and software programming include: Robert Knowlton, Brad Melton...Building Restoration Operations Optimization Model (BROOM). BROOM (Knowlton et al., 2012) was designed for consequence management activities (e.g

  19. A New Signaling Architecture THREP with Autonomous Radio-Link Control for Wireless Communications Systems

    NASA Astrophysics Data System (ADS)

    Hirono, Masahiko; Nojima, Toshio

    This paper presents a new signaling architecture for radio-access control in wireless communications systems. Called THREP (for THREe-phase link set-up Process), it enables systems with low-cost configurations to provide tetherless access and wide-ranging mobility by using autonomous radio-link controls for fast cell searching and distributed call management. A signaling architecture generally consists of a radio-access part and a service-entity-access part. In THREP, the latter part is divided into two steps: preparing a communication channel, and sustaining it. Access control in THREP is thus composed of three separated parts, or protocol phases. The specifications of each phase are determined independently according to system requirements. In the proposed architecture, the first phase uses autonomous radio-link control because we want to construct low-power indoor wireless communications systems. Evaluation of channel usage efficiency and hand-over loss probability in the personal handy-phone system (PHS) shows that THREP makes the radio-access sub-system operations in a practical application model highly efficient, and the results of a field experiment show that THREP provides sufficient protection against severe fast CNR degradation in practical indoor propagation environments.

  20. Multiphase Flow Technology Impacts on Thermal Control Systems for Exploration

    NASA Technical Reports Server (NTRS)

    McQuillen, John; Sankovic, John; Lekan, Jack

    2006-01-01

    The Two-Phase Flow Facility (TPHIFFy) Project focused on bridging the critical knowledge gap by developing and demonstrating critical multiphase fluid products for advanced life support, thermal management and power conversion systems that are required to enable the Vision for Space Exploration. Safety and reliability of future systems will be enhanced by addressing critical microgravity fluid physics issues associated with flow boiling, condensation, phase separation, and system stability. The project included concept development, normal gravity testing, and reduced gravity aircraft flight campaigns, in preparation for the development of a space flight experiment implementation. Data will be utilized to develop predictive models that could be used for system design and operation. A single fluid, two-phase closed thermodynamic loop test bed was designed, assembled and tested. The major components in this test bed include: a boiler, a condenser, a phase separator and a circulating pump. The test loop was instrumented with flow meters, thermocouples, pressure transducers and both high speed and normal speed video cameras. A low boiling point surrogate fluid, FC-72, was selected based on scaling analyses using preliminary designs for operational systems. Preliminary results are presented which include flow regime transitions and some observations regarding system stability.

  1. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  2. Satellite Systems Design/Simulation Environment: A Systems Approach to Pre-Phase A Design

    NASA Technical Reports Server (NTRS)

    Ferebee, Melvin J., Jr.; Troutman, Patrick A.; Monell, Donald W.

    1997-01-01

    A toolset for the rapid development of small satellite systems has been created. The objective of this tool is to support the definition of spacecraft mission concepts to satisfy a given set of mission and instrument requirements. The objective of this report is to provide an introduction to understanding and using the SMALLSAT Model. SMALLSAT is a computer-aided Phase A design and technology evaluation tool for small satellites. SMALLSAT enables satellite designers, mission planners, and technology program managers to observe the likely consequences of their decisions in terms of satellite configuration, non-recurring and recurring cost, and mission life cycle costs and availability statistics. It was developed by Princeton Synergetic, Inc. and User Systems, Inc. as a revision of the previous TECHSAT Phase A design tool, which modeled medium-sized Earth observation satellites. Both TECHSAT and SMALLSAT were developed for NASA.

  3. [Establishment of regional active neonatal transport network].

    PubMed

    Kong, Xiang-yong; Gao, Xin; Yin, Xiao-juan; Hong, Xiao-yang; Fang, Huan-sheng; Wang, Zi-zhen; Li, Ai-hua; Luo, Fen-ping; Feng, Zhi-chun

    2010-01-01

    To evaluate the clinical function and significance of establishing a regional active neonatal transport network (ANTN) in Beijing. The authors retrospectively studied intensive care and the role of ANTN system in management of critically ill neonates and compared the outcome of newborn infants transported to our NICU before and after we established standardized NICU and ANTN system (phase 1: July 2004 to June 2006 vs phase 2: July 2006 to May 2008). The number of neonatal transport significantly increased from 587 during phase 1 to 2797 during phase 2. Success rate of transport and the total cure rate in phase 2 were 97.85% and 91.99% respectively, which were significantly higher than those in phase 1 (94.36% and 88.69%, respectively, P < 0.01). The neonatal mortality significantly decreased in phase 2 compared with that in phase 1 (2.29% vs 4.31%, P < 0.01). The capacity of our NICU was enlarged following the development of ANTN. There are 200 beds for level 3 infants in phase 2, but there were only 20 beds in phase 1. Significantly less patients in the phase 2 had hypothermia, acidosis and the blood glucose instability than those in phase 1 (P < 0.01, 0.05, 0.01 and 0.05, respectively). The proportion of preterm infants transported to our NICU were higher in phase 2 compared with that in phase 1, especially infants whose gestational age was below 32 weeks. The proportions of asphyxia and respiratory distress syndrome were lower in phase 2 than that in phase 1, but the total cure rates of these two diseases had no significant changes between the two phases. The most important finding was that the improvement of outcome of premature infants and those with asphyxia and aspiration syndrome was noted following the development of ANTN. Establishing regional ANTN for a tertiary hospital is very important to elevate the total level in management of critically ill newborn infants. It plays a very important role in reducing mortality and improving total outcomes of newborn infants. There are still some problems remained to solve after four years practice in order to optimize the ANTN to meet needs of the development of neonatology.

  4. Two-Phase Flow in Microchannels with Non-Circular Cross Section

    NASA Astrophysics Data System (ADS)

    Eckett, Chris A.; Strumpf, Hal J.

    2002-11-01

    Two-phase flow in microchannels is of practical importance in several microgravity space technology applications. These include evaporative and condensing heat exchangers for thermal management systems and vapor cycle systems, phase separators, and bioreactors. The flow passages in these devices typically have a rectangular cross-section or some other non-circular cross-section; may include complex flow paths with branches, merges and bends; and may involve channel walls of different wettability. However, previous experimental and analytical investigations of two-phase flow in reduced gravity have focussed on straight, circular tubes. This study is an effort to determine two-phase flow behavior, both with and without heat transfer, in microchannel configurations other than straight, circular tubes. The goals are to investigate the geometrical effects on flow pattern, pressure drop and liquid holdup, as well as to determine the relative importance of capillary, surface tension, inertial, and gravitational forces in such geometries. An evaporative heat exchanger for microgravity thermal management systems has been selected as the target technology in this investigation. Although such a heat exchanger has never been developed at Honeywell, a preliminary sizing has been performed based on knowledge of such devices in normal gravity environments. Fin shapes considered include plain rectangular, offset rectangular, and wavy fin configurations. Each of these fin passages represents a microchannel of non-circular cross section. The pans at the inlet and outlet of the heat exchanger are flow branches and merges, with up to 90-deg bends. R-134a has been used as the refrigerant fluid, although ammonia may well be used in the eventual application.

  5. Development of key performance indicators to evaluate centralized intake for patients with osteoarthritis and rheumatoid arthritis.

    PubMed

    Barber, Claire E; Patel, Jatin N; Woodhouse, Linda; Smith, Christopher; Weiss, Stephen; Homik, Joanne; LeClercq, Sharon; Mosher, Dianne; Christiansen, Tanya; Howden, Jane Squire; Wasylak, Tracy; Greenwood-Lee, James; Emrick, Andrea; Suter, Esther; Kathol, Barb; Khodyakov, Dmitry; Grant, Sean; Campbell-Scherer, Denise; Phillips, Leah; Hendricks, Jennifer; Marshall, Deborah A

    2015-11-14

    Centralized intake is integral to healthcare systems to support timely access to appropriate health services. The aim of this study was to develop key performance indicators (KPIs) to evaluate centralized intake systems for patients with osteoarthritis (OA) and rheumatoid arthritis (RA). Phase 1 involved stakeholder meetings including healthcare providers, managers, researchers and patients to obtain input on candidate KPIs, aligned along six quality dimensions: appropriateness, accessibility, acceptability, efficiency, effectiveness, and safety. Phase 2 involved literature reviews to ensure KPIs were based on best practices and harmonized with existing measures. Phase 3 involved a three-round, online modified Delphi panel to finalize the KPIs. The panel consisted of two rounds of rating and a round of online and in-person discussions. KPIs rated as valid and important (≥7 on a 9-point Likert scale) were included in the final set. Twenty-five KPIs identified and substantiated during Phases 1 and 2 were submitted to 27 panellists including healthcare providers, managers, researchers, and patients in Phase 3. After the in-person meeting, three KPIs were removed and six were suggested. The final set includes 9 OA KPIs, 10 RA KPIs and 9 relating to centralized intake processes for both conditions. All 28 KPIs were rated as valid and important. Arthritis stakeholders have proposed 28 KPIs that should be used in quality improvement efforts when evaluating centralized intake for OA and RA. The KPIs measure five of the six dimensions of quality and are relevant to patients, practitioners and health systems.

  6. Phase 1 Environmental Baseline Survey for Construction of a Solar Photovoltaic System by NV Energy on Nellis Air Force Base, Clark County, Nevada

    DTIC Science & Technology

    2011-01-01

    is managed by the Restoration Program Manager (RPM) of the 99 CES/CEVR. Category 4 – Remedial action required and taken. Property where...Restoration Program Manager Mr. Waldo Pulido was contacted at his office, and he stated that he was not aware of any hazardous materials storage or...Site LF-01 and Site ST-27. Mr. Henry Rodriguez, 99 CES/CEANQ, Toxics Program Manager Mr. Henry Rodriguez was contacted at his office in 2009 as

  7. Prevention of MSD by means of ergonomic risk assessment (tools) in all phases of the vehicle development process.

    PubMed

    Karlheinz, Schaub; Michaela, Kugler; Max, Bierwirth; Andrea, Sinn-Behrendt; Ralph, Bruder

    2012-01-01

    In industrialized countries musculoskeletal disorders (MSD) play an import role and are often responsible for almost one third of the total sick leave. The changes in the demographic profiles, i.e. aging work forces might even worsen this situation in the future. For a highly productive and sustainable use of human resources in production systems, ergonomics offers high potentials. In the recent years the authors have developed several ergonomic risk assessment tools, especially for the use in automotive industries. These methods may be used during the planning phases in the Tech Centers as well as during the production phase at shop floor level. The tools might also be used for a standardized communication in between the Tech Center and the plants to improve the effects of "lessons learned" for the design and layout of workstations and processes and the optimization of vehicle components. This paper describes suitable risk assessment tools as well as the integration of these tools into the vehicle development process. It introduces a comprehensive management approach for the integration of ergonomics into the management of production systems.

  8. Research on Three-phase Four-wire Inverter

    NASA Astrophysics Data System (ADS)

    Xin, W. D.; Li, X. K.; Huang, G. Z.; Fan, X. C.; Gong, X. J.; Sun, L.; Wang, J.; Zhu, D. W.

    2017-05-01

    The concept of Voltage Source Converter (VSC) based hybrid AC and DC distribution system architecture is proposed, which can solve the traditional AC distribution power quality problems and respond to the request of DC distribution development. At first, a novel VSC system structure combining the four-leg based three-phase four-wire with LC filter is adopted, using the overall coordination control scheme of the AC current tracking compensation based grid-interfaced VSC. In the end, the 75 kW simulation experimental system is designed and tested to verify the performance of the proposed VSC under DC distribution, distributed DC sources conditions, as well as power quality management of AC distribution.

  9. Municipal solid waste development phases: Evidence from EU27.

    PubMed

    Vujić, Goran; Gonzalez-Roof, Alvaro; Stanisavljević, Nemanja; Ragossnig, Arne M

    2015-12-01

    Many countries in the European Union (EU) have very developed waste management systems. Some of its members have managed to reduce their landfilled waste to values close to zero during the last decade. Thus, European Union legislation is very stringent regarding waste management for their members and candidate countries, too. This raises the following questions: Is it possible for developing and developed countries to comply with the European Union waste legislation, and under what conditions? How did waste management develop in relation to the economic development in the countries of the European Union? The correlation between waste management practices and economic development was analysed for 27 of the European Union Member States for the time period between 1995 and 2007. In addition, a regression analysis was performed to estimate landfilling of waste in relation to gross domestic product for every country. The results showed a strong correlation between the waste management variables and the gross domestic product of the EU27 members. The definition of the municipal solid waste management development phases followed a closer analysis of the relation between gross domestic product and landfilled waste. The municipal solid waste management phases are characterised by high landfilling rates at low gross domestic product levels, and landfilling rates near zero at high gross domestic product levels. Hence the results emphasize the importance of wider understanding of what is required for developing countries to comply with the European Union initiatives, and highlight the importance of allowing developing countries to make their own paths of waste management development. © The Author(s) 2015.

  10. GeoGIS : phase III.

    DOT National Transportation Integrated Search

    2011-08-01

    GeoGIS is a web-based geotechnical database management system that is being developed for the Alabama : Department of Transportation (ALDOT). The purpose of GeoGIS is to facilitate the efficient storage and retrieval of : geotechnical documents for A...

  11. Evaluating transportation systems management & operations (TSM&O) benefits to alternative intersection treatments.

    DOT National Transportation Integrated Search

    2015-12-01

    This research provides a comprehensive review and assessment of current alternative intersection methods : which successfully eliminate the left-turn phase. With increasing traffic and limited resources, the Florida : Department of Transportati...

  12. Multidisciplinary analysis of invasive meningococcal disease as a framework for continuous quality and safety improvement in regional Australia

    PubMed Central

    Taylor, Kathryn A; Durrheim, David N; Merritt, Tony; Massey, Peter; Ferguson, John; Ryan, Nick; Hullick, Carolyn

    2018-01-01

    Background System factors in a regional Australian health district contributed to avoidable care deviations from invasive meningococcal disease (IMD) management guidelines. Traditional root cause analysis (RCA) is not well-suited to IMD, focusing on individual cases rather than system improvements. As IMD requires complex care across healthcare silos, it presents an opportunity to explore and address system-based patient safety issues. Context Baseline assessment of IMD cases (2005–2006) identified inadequate triage, lack of senior clinician review, inconsistent vital sign recording and laboratory delays as common issues, resulting in antibiotic administration delays and inappropriate or premature discharge. Methods Clinical governance, in partnership with clinical and public health services, established a multidisciplinary Meningococcal Reference Group (MRG) to routinely review management of all IMD cases. The MRG comprised representatives from primary care, acute care, public health, laboratory medicine and clinical governance. Baseline data were compared with two subsequent evaluation points (2011–2012 and 2013–2015). Interventions Phase I involved multidisciplinary process mapping and development of a standardised audit tool from national IMD management guidelines. Phase II involved formalisation of group processes and advocacy for operational change. Phase III focused on dissemination of findings to clinicians and managers. Results Greatest care improvements were observed in the final evaluation. Median antibiotic delay decreased from 72 to 42 min and proportion of cases triaged appropriately improved from 38% to 75% between 2013 and 2015. Increasing fatal outcomes were attributed to the emergence of more virulent meningococcal serotypes. Conclusions The MRG was a key mechanism for identifying system gaps, advocating for change and enhancing communication and coordination across services. Employing IMD case review as a focus for district-level process reflection presents an innovative patient safety approach, combining the strengths of prospective hazard analysis with more traditional RCA methodologies. PMID:29527576

  13. LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORDS K-BASINS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PERES MW

    In May 2007, the Department of Energy and the Fluor Hanford K Basin Closure Project completed transferring sludge from the K East Basin to new containers in the K West Basin using a Hose-in-Hose system. This project presented a number of complex and unique technical, operational, and management challenges that had to be resolved to complete the required transfers and satisfy project milestones. The project team (including DOE; regulators; and Fluor management, operations, maintenance, engineering and all other support organizations) found innovative solutions to each challenge. This paper records lessons learned during the operational phase of the sludge transfer viamore » the Hose-In-Hose system. The subject is limited to the operational phase and does not cover design, development, testing or turnover. A discussion of the situation or problem encountered is provided, along with the lesson learned as applicable to a future program or project.« less

  14. A Location Based Communication Proposal for Disaster Crisis Management

    NASA Astrophysics Data System (ADS)

    Gülnerman, A. G.; Goksel, C.; Tezer, A.

    2014-12-01

    The most vital applications within urban applications under the title of Geographical Information system applications are Disaster applications. Especially, In Turkey the most occured disaster type Earthquakes impacts are hard to retain in urban due to greatness of area, data and effected resident or victim. Currently, communications between victims and institutions congested and collapsed, after disaster that results emergency service delay and so secondary death and desperation. To avoid these types of life loss, the communication should be established between public and institutions. Geographical Information System Technology is seen capable of data management techniques and communication tool. In this study, Life Saving Kiosk Modal Proposal designed as a communication tool based on GIS, after disaster, takes locational emegency demands, meets emergency demands over notification maps which is created by those demands,increase public solidarity by visualizing close emergency demanded area surrounded another one and gathers emergency service demanded institutions notifications and aims to increasethe capability of management. This design prosals' leading role is public. Increase in capability depends on public major contribution to disaster management by required communication infrastructure establishment. The aim is to propound public power instead of public despiration. Apart from general view of disaster crisis management approaches, Life Saving Kiosk Modal Proposal indicates preparedness and response phases within the disaster cycle and solve crisis management with the organization of design in preparedness phase, use in response phase. This resolution modal flow diagram is builded between public, communication tool (kiosk) amd response force. The software is included in communication tools whose functions, interface designs and user algorithms are provided considering the public participation. In this study, disaster crisis management with public participation and power use with data flow modal based on location is came up for discussion by comparing with the other available applications in manner of time, detail of data, required staff and expertise degree, data reality and data archive.

  15. Opportunities for disease state management in prostate cancer.

    PubMed

    Pickard, A Simon; Hung, Shih-Ying; McKoy, June M; Witt, Whitney P; Arseven, Adnan; Sharifi, Roohollah; Wu, Zhigang; Knight, Sara J; McWilliams, Norene; Schumock, Glen T; Bennett, Charles L

    2005-08-01

    In this paper, we examine how the management of prostate cancer lends itself to a disease state management (DSM)-based approach, and propose a framework that emphasizes the patient-provider-caregiver triad in managing the long-term implications of the condition. There is often no clearly superior approach to the management of patients with prostate cancer (eg, watchful waiting and hormonal therapy), and each option entails different trade-offs in quality of life. Ideally, the physician and patient discuss the options, issues, and patient preferences for treatment through the shared decision-making process. A family caregiver such as the spouse of the patient is often involved in the treatment decision and in the long-term management of the cancer experience. In order to develop a DSM program supporting both patient and caregiver, educational, psychosocial, and health care system support needs should be tailored to each phase of cancer treatment/management. To embrace the unique aspects of prostate cancer management, the proposed framework emphasizes communication among the patient-caregiver-provider triad, inclusion of family caregivers in the program, cancer phase-specific support, and psychosocial services as a basis for implementation and evaluation of a DSM program in prostate cancer.

  16. System Qualities Ontology, Tradespace and Affordability (SQOTA) Project: Phase 5

    DTIC Science & Technology

    2017-04-30

    Principal Investigator: Dr. Barry Boehm, University of Southern California Research Team: Organizations 1: Air force Institute of Technology...Date April 30, 2017 Copyright © 2017 Stevens Institute of Technology, Systems Engineering Research Center The Systems Engineering Research ...Center (SERC) is a federally funded University Affiliated Research Center managed by Stevens Institute of Technology. This material is based upon

  17. Heat transfer and thermal management of electric vehicle batteries with phase change materials

    NASA Astrophysics Data System (ADS)

    Ramandi, M. Y.; Dincer, I.; Naterer, G. F.

    2011-07-01

    This paper examines a passive thermal management system for electric vehicle batteries, consisting of encapsulated phase change material (PCM) which melts during a process to absorb the heat generated by a battery. A new configuration for the thermal management system, using double series PCM shells, is analyzed with finite volume simulations. A combination of computational fluid dynamics (CFD) and second law analysis is used to evaluate and compare the new system against the single PCM shells. Using a finite volume method, heat transfer in the battery pack is examined and the results are used to analyse the exergy losses. The simulations provide design guidelines for the thermal management system to minimize the size and cost of the system. The thermal conductivity and melting temperature are studied as two important parameters in the configuration of the shells. Heat transfer from the surroundings to the PCM shell in a non-insulated case is found to be infeasible. For a single PCM system, the exergy efficiency is below 50%. For the second case for other combinations, the exergy efficiencies ranged from 30-40%. The second shell content did not have significant influence on the exergy efficiencies. The double PCM shell system showed higher exergy efficiencies than the single PCM shell system (except a case for type PCM-1). With respect to the reference environment, it is found that in all cases the exergy efficiencies decreased, when the dead-state temperatures rises, and the destroyed exergy content increases gradually. For the double shell systems for all dead-state temperatures, the efficiencies were very similar. Except for a dead-state temperature of 302 K, with the other temperatures, the exergy efficiencies for different combinations are well over 50%. The range of exergy efficiencies vary widely between 15 and 85% for a single shell system, and between 30-80% for double shell systems.

  18. Method of energy load management using PCM for heating and cooling of buildings

    DOEpatents

    Stovall, T.K.; Tomlinson, J.J.

    1996-03-26

    A method is described for energy load management for the heating and cooling of a building. The method involves utilizing a wallboard as a portion of the building, the wallboard containing about 5 to about 30 wt.% phase change material such that melting of the phase change material occurs during a rise in temperature within the building to remove heat from the air, and a solidification of the phase change material occurs during a lowering of the temperature to dispense heat into the air. At the beginning of either of these cooling or heating cycles, the phase change material is preferably ``fully charged``. In preferred installations one type of wallboard is used on the interior surfaces of exterior walls, and another type as the surface on interior walls. The particular PCM is chosen for the desired wall and room temperature of these locations. In addition, load management is achieved by using PCM-containing wallboards that form cavities of the building such that the cavities can be used for the air handling duct and plenum system of the building. Enhanced load management is achieved by using a thermostat with reduced dead band of about the upper half of a normal dead band of over three degrees. In some applications, air circulation at a rate greater than normal convection provides additional comfort. 7 figs.

  19. Method of energy load management using PCM for heating and cooling of buildings

    DOEpatents

    Stovall, Therese K.; Tomlinson, John J.

    1996-01-01

    A method of energy load management for the heating and cooling of a building. The method involves utilizing a wallboard as a portion of the building, the wallboard containing about 5 to about 30 wt. % a phase change material such that melting of the phase change material occurs during a rise in temperature within the building to remove heat from the air, and a solidification of the phase change material occurs during a lowering of the temperature to dispense heat into the air. At the beginning of either of these cooling or heating cycles, the phase change material is preferably "fully charged". In preferred installations one type of wallboard is used on the interior surfaces of exterior walls, and another type as the surface on interior walls. The particular PCM is chosen for the desired wall and room temperature of these locations. In addition, load management is achieved by using PCM-containing wallboard that form cavities of the building such that the cavities can be used for the air handling duct and plenum system of the building. Enhanced load management is achieved by using a thermostat with reduced dead band of about the upper half of a normal dead band of over three degree. In some applications, air circulation at a rate greater than normal convection provides additional comfort.

  20. Method of energy load management using PCM for heating and cooling of buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stovall, T.K.; Tomlinson, J.J.

    1996-03-26

    A method is described for energy load management for the heating and cooling of a building. The method involves utilizing a wallboard as a portion of the building, the wallboard containing about 5 to about 30 wt.% phase change material such that melting of the phase change material occurs during a rise in temperature within the building to remove heat from the air, and a solidification of the phase change material occurs during a lowering of the temperature to dispense heat into the air. At the beginning of either of these cooling or heating cycles, the phase change material ismore » preferably ``fully charged``. In preferred installations one type of wallboard is used on the interior surfaces of exterior walls, and another type as the surface on interior walls. The particular PCM is chosen for the desired wall and room temperature of these locations. In addition, load management is achieved by using PCM-containing wallboards that form cavities of the building such that the cavities can be used for the air handling duct and plenum system of the building. Enhanced load management is achieved by using a thermostat with reduced dead band of about the upper half of a normal dead band of over three degrees. In some applications, air circulation at a rate greater than normal convection provides additional comfort. 7 figs.« less

  1. Oak Ridge Environmental Information System (OREIS) functional system design document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birchfield, T.E.; Brown, M.O.; Coleman, P.R.

    1994-03-01

    The OREIS Functional System Design document provides a detailed functional description of the Oak Ridge Environmental Information System (OREIS). It expands the system requirements defined in the OREIS Phase 1-System Definition Document (ES/ER/TM-34). Documentation of OREIS development is based on the Automated Data Processing System Development Methodology, a Martin Marietta Energy Systems, Inc., procedure written to assist in developing scientific and technical computer systems. This document focuses on the development of the functional design of the user interface, which includes the integration of commercial applications software. The data model and data dictionary are summarized briefly; however, the Data Management Planmore » for OREIS (ES/ER/TM-39), a companion document to the Functional System Design document, provides the complete data dictionary and detailed descriptions of the requirements for the data base structure. The OREIS system will provide the following functions, which are executed from a Menu Manager: (1) preferences, (2) view manager, (3) macro manager, (4) data analysis (assisted analysis and unassisted analysis), and (5) spatial analysis/map generation (assisted ARC/INFO and unassisted ARC/INFO). Additional functionality includes interprocess communications, which handle background operations of OREIS.« less

  2. Evolutionary Concepts for Decentralized Air Traffic Flow Management

    NASA Technical Reports Server (NTRS)

    Adams, Milton; Kolitz, Stephan; Milner, Joseph; Odoni, Amedeo

    1997-01-01

    Alternative concepts for modifying the policies and procedures under which the air traffic flow management system operates are described, and an approach to the evaluation of those concepts is discussed. Here, air traffic flow management includes all activities related to the management of the flow of aircraft and related system resources from 'block to block.' The alternative concepts represent stages in the evolution from the current system, in which air traffic management decision making is largely centralized within the FAA, to a more decentralized approach wherein the airlines and other airspace users collaborate in air traffic management decision making with the FAA. The emphasis in the discussion is on a viable medium-term partially decentralized scenario representing a phase of this evolution that is consistent with the decision-making approaches embodied in proposed Free Flight concepts for air traffic management. System-level metrics for analyzing and evaluating the various alternatives are defined, and a simulation testbed developed to generate values for those metrics is described. The fundamental issue of modeling airline behavior in decentralized environments is also raised, and an example of such a model, which deals with the preservation of flight bank integrity in hub airports, is presented.

  3. Developing and Evaluating JIApp: Acceptability and Usability of a Smartphone App System to Improve Self-Management in Young People With Juvenile Idiopathic Arthritis

    PubMed Central

    Beste, Dominik; Chaplin, Hema; Varakliotis, Socrates; Suffield, Linda; Josephs, Francesca; Sen, Debajit; Wedderburn, Lucy R; Ioannou, Yiannakis; Hailes, Stephen; Eleftheriou, Despina

    2017-01-01

    Background Flare-ups in juvenile idiopathic arthritis (JIA) are characterized by joint pain and swelling and often accompanied with fatigue, negative emotions, and reduced participation in activities. To minimize the impact of JIA on the physical and psychosocial development and well-being of young people (YP), it is essential to regularly monitor disease activity and side effects, as well as to support self-management such as adherence to treatment plans and engagement in general health-promoting behaviors. Smartphone technology has the potential to engage YP with their health care through convenient self-monitoring and easy access to information. In addition, having a more accurate summary of self-reported fluctuations in symptoms, behaviors, and psychosocial problems can help both YP and health care professionals (HCPs) better understand the patient’s condition, identify barriers to self-management, and assess treatment effectiveness and additional health care needs. No comprehensive smartphone app has yet been developed in collaboration with YP with JIA, their parents, and HCPs involved in their care. Objectives The objective of this study was to design, develop, and evaluate the acceptability and usability of JIApp, a self-management smartphone app system for YP with JIA and HCPs. Methods We used a qualitative, user-centered design approach involving YP, parents, and HCPs from the rheumatology team. The study was conducted in three phases: (1) phase I focused on developing consensus on the features, content, and design of the app; (2) phase II was used for further refining and evaluating the app prototype; and (3) phase III focused on usability testing of the app. The interview transcripts were analyzed using qualitative content analysis. Results A total of 29 YP (aged 10-23, median age 17) with JIA, 7 parents, and 21 HCPs were interviewed. Major themes identified as the ones that helped inform app development in phase I were: (1) remote monitoring of symptoms, well-being, and activities; (2) treatment adherence; and (3) education and support. During phase II, three more themes emerged that informed further refinement of the app prototype. These included (4) adapting a reward system to motivate end users for using the app; (5) design of the app interface; and (6) clinical practice integration. The usability testing during phase III demonstrated high rates of overall satisfaction and further affirmed the content validity of the app. Conclusions We present the development and evaluation of a smartphone app to encourage self-management and engagement with health care for YP with JIA. The app was found to have high levels of acceptability and usability among YP and HCPs and has the potential to improve health care and outcomes for this age group. Future feasibility testing in a prospective study will firmly establish the reliability, efficacy, and cost-effectiveness of such an app intervention for patients with arthritis. PMID:28811270

  4. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 3 : use of scanning LiDAR in structural evaluation of bridges.

    DOT National Transportation Integrated Search

    2009-12-01

    This volume introduces several applications of remote bridge inspection technologies studied in : this Integrated Remote Sensing and Visualization (IRSV) study using ground-based LiDAR : systems. In particular, the application of terrestrial LiDAR fo...

  5. Applications of Remote Sensing to Emergency Management.

    DTIC Science & Technology

    1980-02-15

    Contents: Foundations of Remote Sensing : Data Acquisition and Interpretation; Availability of Remote Sensing Technology for Disaster Response...Imaging Systems, Current and Near Future Satellite and Aircraft Remote Sensing Systems; Utilization of Remote Sensing in Disaster Response: Categories of...Disasters, Phases of Monitoring Activities; Recommendations for Utilization of Remote Sensing Technology in Disaster Response; Selected Reading List.

  6. Impact of Hands-On Research Experience on Students' Learning in an Introductory Management Information System Course

    ERIC Educational Resources Information Center

    Wu, Yun; Sankar, Chetan S.

    2013-01-01

    Although students in Introductory Information Systems courses are taught new technology concepts, the complexity and constantly changing nature of these technologies makes it challenging to deliver the concepts effectively. Aiming to improve students' learning experiences, this research utilized the five phases of design science methodology to…

  7. Final report : federal earmark ITS-9851(003) : Virginia Department of Transportation : Northern Virginia smart traffic center video quality improvement program

    DOT National Transportation Integrated Search

    2005-08-01

    Like many freeway traffic management systems around the country, the NOVA STC system was implemented in phases over a period of years. As a result, some field components had reached their maximum life cycle, including a portion of the CCTV subsystem....

  8. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 4 : web-based bridge information database--visualization analytics and distributed sensing.

    DOT National Transportation Integrated Search

    2012-03-01

    This report introduces the design and implementation of a Web-based bridge information visual analytics system. This : project integrates Internet, multiple databases, remote sensing, and other visualization technologies. The result : combines a GIS ...

  9. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase one, volume 2 : knowledge modeling and database development.

    DOT National Transportation Integrated Search

    2009-12-01

    The Integrated Remote Sensing and Visualization System (IRSV) is being designed to accommodate the needs of todays Bridge Engineers at the : state and local level from several aspects that were documented in Volume One, Summary Report. The followi...

  10. Nasreya: a treatment and disposal facility for industrial hazardous waste in Alexandria, Egypt: phase I.

    PubMed

    Ramadan, Adham R; Kock, Per; Nadim, Amani

    2005-04-01

    A facility for the treatment and disposal of industrial hazardous waste has been established in Alexandria, Egypt. Phase I of the facility encompassing a secure landfill and solar evaporation ponds is ready to receive waste, and Phase II encompassing physico-chemical treatment, solidification, and interim storage is underway. The facility, the Nasreya Centre, is the first of its kind in Egypt, and represents the nucleus for the integration, improvement and further expansion of different hazardous waste management practices and services in Alexandria. It has been developed within the overall legal framework of the Egyptian Law for the Environment, and is expected to improve prospects for enforcement of the regulatory requirements specified in this law. It has been developed with the overall aim of promoting the establishment of an integrated industrial hazardous waste management system in Alexandria, serving as a demonstration to be replicated elsewhere in Egypt. For Phase I, the Centre only accepts inorganic industrial wastes. In this respect, a waste acceptance policy has been developed, which is expected to be reviewed during Phase II, with an expansion of the waste types accepted.

  11. Thermally coupled moving boundary model for charge-discharge of LiFePO4/C cells

    NASA Astrophysics Data System (ADS)

    Khandelwal, Ashish; Hariharan, Krishnan S.; Gambhire, Priya; Kolake, Subramanya Mayya; Yeo, Taejung; Doo, Seokgwang

    2015-04-01

    Optimal thermal management is a key requirement in commercial utilization of lithium ion battery comprising of phase change electrodes. In order to facilitate design of battery packs, thermal management systems and fast charging profiles, a thermally coupled electrochemical model that takes into account the phase change phenomenon is required. In the present work, an electrochemical thermal model is proposed which includes the biphasic nature of phase change electrodes, such as lithium iron phosphate (LFP), via a generalized moving boundary model. The contribution of phase change to the heat released during the cell operation is modeled using an equivalent enthalpy approach. The heat released due to phase transformation is analyzed in comparison with other sources of heat such as reversible, irreversible and ohmic. Detailed study of the thermal behavior of the individual cell components with changing ambient temperature, rate of operation and heat transfer coefficient is carried out. Analysis of heat generation in the various regimes is used to develop cell design and operating guidelines. Further, different charging protocols are analyzed and a model based methodology is suggested to design an efficient quick charging protocol.

  12. Analysis of navigation and guidance requirements for commercial VTOL operations

    NASA Technical Reports Server (NTRS)

    Hoffman, W. C.; Zvara, J.; Hollister, W. M.

    1975-01-01

    The paper presents some results of a program undertaken to define navigation and guidance requirements for commercial VTOL operations in the takeoff, cruise, terminal and landing phases of flight in weather conditions up to and including Category III. Quantitative navigation requirements are given for the parameters range, coverage, operation near obstacles, horizontal accuracy, multiple landing aircraft, multiple pad requirements, inertial/radio-inertial requirements, reliability/redundancy, update rate, and data link requirements in all flight phases. A multi-configuration straw-man navigation and guidance system for commercial VTOL operations is presented. Operation of the system is keyed to a fully automatic approach for navigation, guidance and control, with pilot as monitor-manager. The system is a hybrid navigator using a relatively low-cost inertial sensor with DME updates and MLS in the approach/departure phases.

  13. Passive control of temperature excursion and uniformity in high-energy Li-ion battery packs at high current and ambient temperature

    NASA Astrophysics Data System (ADS)

    Kizilel, R.; Lateef, A.; Sabbah, R.; Farid, M. M.; Selman, J. R.; Al-Hallaj, S.

    A strategy for portable high-power applications with a controlled thermal environment has been developed and has demonstrated the advantage of using the novel phase change material (PCM) thermal management systems over conventional active cooling systems. A passive thermal management system using PCM for Li-ion batteries is tested for extreme conditions, such as ambient temperature of 45 °C and discharge rate of 2.08 C-rate (10 A). Contrary to Li-ion packs without thermal management system, high-energy packs with PCM are discharged safely at high currents and degrading rate of capacity of the Li-ion packs lowered by half. Moreover, the compactness of the packs not only decreases the volume occupied by the packs and its associated complex cooling system, but also decreases the total weight for large power application.

  14. Knowledge-based support for the participatory design and implementation of shift systems.

    PubMed

    Gissel, A; Knauth, P

    1998-01-01

    This study developed a knowledge-based software system to support the participatory design and implementation of shift systems as a joint planning process including shift workers, the workers' committee, and management. The system was developed using a model-based approach. During the 1st phase, group discussions were repeatedly conducted with 2 experts. Thereafter a structure model of the process was generated and subsequently refined by the experts in additional semistructured interviews. Next, a factual knowledge base of 1713 relevant studies was collected on the effects of shift work. Finally, a prototype of the knowledge-based system was tested on 12 case studies. During the first 2 phases of the system, important basic information about the tasks to be carried out is provided for the user. During the 3rd phase this approach uses the problem-solving method of case-based reasoning to determine a shift rota which has already proved successful in other applications. It can then be modified in the 4th phase according to the shift workers' preferences. The last 2 phases support the final testing and evaluation of the system. The application of this system has shown that it is possible to obtain shift rotas suitable to actual problems and representative of good ergonomic solutions. A knowledge-based approach seems to provide valuable support for the complex task of designing and implementing a new shift system. The separation of the task into several phases, the provision of information at all stages, and the integration of all parties concerned seem to be essential factors for the success of the application.

  15. Factors associated with Neospora caninum serostatus in cattle of 20 specialised Costa Rican dairy herds.

    PubMed

    Romero, J J; Perez, E; Dolz, G; Frankena, K

    2002-04-15

    Twenty-five specialised Costa Rican dairy farms (located in the Poás area) were used to determine neosporosis seroprevalence and the association of seropositivity with environmental and management factors. The farms involved were selected intentionally and all of them use VAMPP 5.1 (Veterinary Automated Management and Production Control Programme) as management-information system. Holstein-Friesian, Jersey and crosses between them were the most-frequent breeds in these herds. The number of females per farm varied from 41 to 296. Our cross-sectional study had two phases. In the first phase, we determined the presence or absence of seropositivity at herd level. For the second phase, all females in 20 seropositive farms were bled. Serum samples were tested for antibodies to Neospora caninum using an indirect enzyme-linked immunosorbent assay (ELISA). A questionnaire with factors mentioned in the literature was administered to the farmers. Logistic regression (LR with herd as random effect) was used to assess the relationships of the serostatus at the individual level with characteristics of the cows and environmental factors. In the first phase all herds had >20% seropositive females; therefore, all herds were eligible for the second phase. In the second phase, the overall prevalence was 39.7% (1191/3002), and within-herd prevalences were between 25.0 and 70.5%. Age 3-6 years, parity < or =2 of the dam of the cow, Jersey breed and lack of purposive sampling to diagnose abortive infectious disease were associated with positive serostatus; other management and environmental factors did not show significant associations. The lack of association between management and environmental factors with serostatus might be because all farms were exposed to a considerable number of potential factors. That all herds of this study were seropositive for neosporosis and the within-herd prevalence was considerable raises questions about how far the infection is spread in other dairy areas of Costa Rica.

  16. Advanced Health Management System for the Space Shuttle Main Engine

    NASA Technical Reports Server (NTRS)

    Davidson, Matt; Stephens, John

    2004-01-01

    Boeing-Canoga Park (BCP) and NASA-Marshall Space Flight Center (NASA-MSFC) are developing an Advanced Health Management System (AHMS) for use on the Space Shuttle Main Engine (SSME) that will improve Shuttle safety by reducing the probability of catastrophic engine failures during the powered ascent phase of a Shuttle mission. This is a phased approach that consists of an upgrade to the current Space Shuttle Main Engine Controller (SSMEC) to add turbomachinery synchronous vibration protection and addition of a separate Health Management Computer (HMC) that will utilize advanced algorithms to detect and mitigate predefined engine anomalies. The purpose of the Shuttle AHMS is twofold; one is to increase the probability of successfully placing the Orbiter into the intended orbit, and the other is to increase the probability of being able to safely execute an abort of a Space Transportation System (STS) launch. Both objectives are achieved by increasing the useful work envelope of a Space Shuttle Main Engine after it has developed anomalous performance during launch and the ascent phase of the mission. This increase in work envelope will be the result of two new anomaly mitigation options, in addition to existing engine shutdown, that were previously unavailable. The added anomaly mitigation options include engine throttle-down and performance correction (adjustment of engine oxidizer to fuel ratio), as well as enhanced sensor disqualification capability. The HMC is intended to provide the computing power necessary to diagnose selected anomalous engine behaviors and for making recommendations to the engine controller for anomaly mitigation. Independent auditors have assessed the reduction in Shuttle ascent risk to be on the order of 40% with the combined system and a three times improvement in mission success.

  17. Developing management capacity building package to district health manager in northwest of Iran: A sequential mixed method study.

    PubMed

    Tabrizi, Jafar Sadegh; Gholipour, Kamal; Farahbakhsh, Mostafa; Jahanbin, Hasan; Karamuz, Majid

    2016-11-01

    To assess districts health managers educational needs and develop management training programmes. This mixed-method study was carried out between August 2014 and August 2015 in Tabriz, Iran. Four focus group discussion sessions and three semi-structured face-to-face interviews were conducted among district health managers and experts of a health centre. Besides, 52 questionnaires were completed to weigh and finalise management education module and courses. Interviews and focus group discussions were tape-recorded, transcribed and analysed using content analysis method. Data was analysed using SPSS17. There were 52 participants, of whom 40(78.8%) were men and 12(21.2%) were women. All of the subjects (100%) took part in the quantitative phase, while 25(48.08%) participated in the qualitative phase. In the qualitative section, 11(44%) participants were heads of unit/departments in provincial health centre and 14(56%) were district health managers. In the quantitative phase, 30(57.7%) participants were district health managers and 8(28.8%) were heads of units/departments. Moreover, 33(63.4%) participants had medical education. The job experience of 3(5.8%) participants in the current position was below five years. Districts health management training programme consisted of 10modules with 53 educational topics. The normalised score out of a total of 100 for rules and ethics was 75.51, health information management 71.19, management and leadership 69.27, district management 68.08, human resources and organisational creativity 67.58,quality improvement 66.6, health resources management 62.37, planning and evaluation 61.87, research in health system 59.15, and community participation was 53.15. Considering district health managers' qualification in health and medicine, they had not been trained in basic management. Almost all the management and leadership courses were prioritised as most necessary.

  18. Management of the diffusion of 4-methylumbelliferone across phases in microdroplet-based systems for in vitro protein evolution.

    PubMed

    Wu, Nan; Courtois, Fabienne; Zhu, Yonggang; Oakeshott, John; Easton, Chris; Abell, Chris

    2010-09-01

    Fluorongenic reagents based on 4-methylumbelliferone (4-MU) have been widely used for the detection of phosphatase, sulfatase, esterase, lipase and glycosidase activities in conventionally formatted enzyme assay systems. However, the sensitivity of assays based on these substrates is also potentially very useful in the microdroplet formats now being developed for high throughput in vitro evolution experiments. In this article, we report the investigation of diffusion of 4-MU as a model dye from water-in-oil droplets and the internal aqueous phase of water-in-oil-in-water droplets in microfluidics. The effect of BSA in the aqueous phase on the diffusion of 4-MU is also discussed. Based on these results, we provided here proof-of-concept of the reaction of the enzyme OpdA with the substrate coumaphos in water-in-oil-in-water droplets. In this double-emulsion system, the reaction of OpdA and coumaphos was achieved by allowing coumaphos to diffuse from the continuous aqueous phase across the oil phase into the internal aqueous droplets.

  19. Compaction managed mirror bend achromat

    DOEpatents

    Douglas, David [Yorktown, VA

    2005-10-18

    A method for controlling the momentum compaction in a beam of charged particles. The method includes a compaction-managed mirror bend achromat (CMMBA) that provides a beamline design that retains the large momentum acceptance of a conventional mirror bend achromat. The CMMBA also provides the ability to tailor the system momentum compaction spectrum as desired for specific applications. The CMMBA enables magnetostatic management of the longitudinal phase space in Energy Recovery Linacs (ERLs) thereby alleviating the need for harmonic linearization of the RF waveform.

  20. Managing Requirements-Documents to Data

    NASA Technical Reports Server (NTRS)

    Orr, Kevin; Hudson, Abe

    2017-01-01

    Managing Requirements on long term projects like International Space Station (ISS) can go thru many phases, from initial product development to almost over 20 years of operations and sustainment. Over that time many authorized changes have been made to the requirement set, that apply to any new systems that would visit the ISS today, like commercial cargo/crew vehicles or payloads. Explore the benefits of managing requirements in a database while satisfying traditional documents needs for contracts and stakeholder/user consumption that are not tied into the database.

  1. Promoting a culture of disaster preparedness.

    PubMed

    Medina, Angeli

    2016-01-01

    Disasters from all hazards, ranging from natural disasters, human-induced disasters, effects of climate change to social conflicts can significantly affect the healthcare system and community. This requires a paradigm shift from a reactive approach to a disaster risk management 'all-hazards' approach. Disaster management is a joint effort of the city, state, regional, national, multi-agencies and international organisations that requires effective communication, collaboration and coordination. This paper offers lessons learned and best practices, which, when taken into consideration, can strengthen the phases of disaster risk management.

  2. Optimizing Marine Corps Maintenance Personnel Conversion to the Joint Strike Fighter

    DTIC Science & Technology

    2012-03-01

    experience levels, retention, fix rates, operations tempo, spare parts issues, and aircraft systems reliability and maintainability are as well related to...manning requirements. The initial phase, which starts six months before the squadron stands up, is called RFO (Ready For Operation ). The second phase...Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget

  3. A Decade of Carbon Flux Measurements with Annual and Perennial Crop Rotations on the Canadian Prairies

    NASA Astrophysics Data System (ADS)

    Amiro, B. D.; Tenuta, M.; Gao, X.; Gervais, M.

    2016-12-01

    The Fluxnet database has over 100 cropland sites, some of which have long-term (over a decade) measurements. Carbon neutrality is one goal of sustainable agriculture, although measurements over many annual cropping systems have indicated that soil carbon is often lost. Croplands are complex systems because the CO2 exchange depends on the type of crop, soil, weather, and management decisions such as planting date, nutrient fertilization and pest management strategy. Crop rotations are often used to decrease pest pressure, and can range from a simple 2-crop system, to have 4 or more crops in series. Carbon dioxide exchange has been measured using the flux-gradient technique since 2006 in agricultural systems in Manitoba, Canada. Two cropping systems are being followed: one that is a rotation of annual crops (corn, faba bean, spring wheat, rapeseed, barley, spring wheat, corn, soybean, spring wheat, soybean); and the other with a perennial phase of alfalfa/grass in years 3 to 6. Net ecosystem production ranged from a gain of 330 g C m-2 y-1 in corn to a loss of 75 g C m-2 y-1 in a poor spring-wheat crop. Over a decade, net ecosystem production for the annual cropping system was not significantly different from zero (carbon neutral), but the addition of the perennial phase increased the sink to 130 g C m-2 y-1. Once harvest removals were included, there was a net loss of carbon ranging from 77 g C m-2 y-1 in the annual system to 52 g C m-2 y-1 in the annual-perennial system; but neither of these were significantly different from zero. Termination of the perennial phase of the rotation only caused short-term increases in respiration. We conclude that both these systems were close to carbon-neutral over a decade even though they were tilled with a short growing season (90 to 130 days). We discuss the need for more datasets on agricultural systems to inform management options to increase the soil carbon sink.

  4. Electronic construction collaboration system -- final phase : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-07-01

    Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...

  5. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    DOT National Transportation Integrated Search

    1997-09-26

    Appendices A & B of the "Implementation of the National Intelligent Transportation Systems Program", a report forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA).

  6. Laboratory and quality assurance protocols for the analysis of herbicides in ground water from the Management Systems Evaluation Area, Princeton, Minnesota

    USGS Publications Warehouse

    Larson, S.J.; Capel, P.D.; VanderLoop, A.G.

    1996-01-01

    Laboratory and quality assurance procedures for the analysis of ground-water samples for herbicides at the Management Systems Evaluation Area near Princeton, Minnesota are described. The target herbicides include atrazine, de-ethylatrazine, de-isopropylatrazine, metribuzin, alachlor, 2,6-diethylaniline, and metolachlor. The analytical techniques used are solid-phase extraction, and analysis by gas chromatography with mass-selective detection. Descriptions of cleaning procedures, preparation of standard solutions, isolation of analytes from water, sample transfer methods, instrumental analysis, and data analysis are included.

  7. Management Control Systems in Not-for-Profit Organizations: A Case Study.

    DTIC Science & Technology

    1982-12-01

    UNCLASSIFIED F/G 5/1 NL mhmmhhhhhmhmmum IEIIEEIIIIIEEE EIIIIIIIIIIIIl Diiit 1.1_I220 H- M141116 MICROCOPY RESOLUION4 TEST CHART 14ATIONAL BUREAU Of... test case. C. RESEARCH RET HODS The first phase of the study was a review of current literature on management control procedures and systems in...RESOLUTION TEST CHART NATIONAL BUREAU 0f SIANDARD 96% A I II a U a .1 ii IiU- I! IA i -~ - U I -..................... I I ~ 3 ,’u!nAA~~ -~~j ~; Eu ~ II 8I~ ~B

  8. Software Quality Metrics: A Software Management Monitoring Method for Air Force Logistics Command in Its Software Quality Assurance Program for the Quantitative Assessment of the System Development Life Cycle under Configuration Management.

    DTIC Science & Technology

    1982-03-01

    pilot systems. Magnitude of the mutant error is classified as: o Program does not compute. o Program computes but does not run test data. o Program...14 Test and Integration ... ............ .. 105 15 The Mapping of SQM to the SDLC ........ ... 108 16 ADS Development .... .............. . 224 17...and funds. While the test phase concludes the normal development cycle, one should realize that with software the development continues in the

  9. Texas A&M vortex type phase separator

    NASA Astrophysics Data System (ADS)

    Best, Frederick

    2000-01-01

    Phase separation is required for regenerative biological and chemical process systems as well as thermal transport and rejection systems. Liquid and gas management requirements for future spacecraft will demand small, passive systems able to operate over wide ranges of inlet qualities. Conservation and recycling of air and water is a necessary part of the construction and operation of the International Space Station as well as future long duration space missions. Space systems are sensitive to volume, mass, and power. Therefore, it is necessary to develop a method to recycle wastewater with minimal power consumption. Regenerative life support systems currently being investigated require phase separation to separate the liquid from the gas produced. The microgravity phase separator designed and fabricated at Texas A&M University relies on centripetal driven buoyancy forces to form a gas-liquid vortex within a fixed, right-circular cylinder. Two-phase flow is injected tangentially along the inner wall of this cylinder producing a radial acceleration gradient. The gradient produced from the intrinsic momentum of the injected mixture results in a rotating flow that drives the buoyancy process by the production of a hydrostatic pressure gradient. Texas A&M has flown several KC-135 flights with separator. These flights have included scaling studies, stability and transient investigations, and tests for inventory instrumentation. Among the hardware tested have been passive devices for separating mixed vapor/liquid streams into single-phase streams of vapor only and liquid only. .

  10. FEL system with homogeneous average output

    DOEpatents

    Douglas, David R.; Legg, Robert; Whitney, R. Roy; Neil, George; Powers, Thomas Joseph

    2018-01-16

    A method of varying the output of a free electron laser (FEL) on very short time scales to produce a slightly broader, but smooth, time-averaged wavelength spectrum. The method includes injecting into an accelerator a sequence of bunch trains at phase offsets from crest. Accelerating the particles to full energy to result in distinct and independently controlled, by the choice of phase offset, phase-energy correlations or chirps on each bunch train. The earlier trains will be more strongly chirped, the later trains less chirped. For an energy recovered linac (ERL), the beam may be recirculated using a transport system with linear and nonlinear momentum compactions M.sub.56, which are selected to compress all three bunch trains at the FEL with higher order terms managed.

  11. Evaluation of a clinical decision support tool for osteoporosis disease management: protocol for an interrupted time series design.

    PubMed

    Kastner, Monika; Sawka, Anna; Thorpe, Kevin; Chignel, Mark; Marquez, Christine; Newton, David; Straus, Sharon E

    2011-07-22

    Osteoporosis affects over 200 million people worldwide at a high cost to healthcare systems. Although guidelines on assessing and managing osteoporosis are available, many patients are not receiving appropriate diagnostic testing or treatment. Findings from a systematic review of osteoporosis interventions, a series of mixed-methods studies, and advice from experts in osteoporosis and human-factors engineering were used collectively to develop a multicomponent tool (targeted to family physicians and patients at risk for osteoporosis) that may support clinical decision making in osteoporosis disease management at the point of care. A three-phased approach will be used to evaluate the osteoporosis tool. In phase 1, the tool will be implemented in three family practices. It will involve ensuring optimal functioning of the tool while minimizing disruption to usual practice. In phase 2, the tool will be pilot tested in a quasi-experimental interrupted time series (ITS) design to determine if it can improve osteoporosis disease management at the point of care. Phase 3 will involve conducting a qualitative postintervention follow-up study to better understand participants' experiences and perceived utility of the tool and readiness to adopt the tool at the point of care. The osteoporosis tool has the potential to make several contributions to the development and evaluation of complex, chronic disease interventions, such as the inclusion of an implementation strategy prior to conducting an evaluation study. Anticipated benefits of the tool may be to increase awareness for patients about osteoporosis and its associated risks and provide an opportunity to discuss a management plan with their physician, which may all facilitate patient self-management.

  12. Evaluation of a clinical decision support tool for osteoporosis disease management: protocol for an interrupted time series design

    PubMed Central

    2011-01-01

    Background Osteoporosis affects over 200 million people worldwide at a high cost to healthcare systems. Although guidelines on assessing and managing osteoporosis are available, many patients are not receiving appropriate diagnostic testing or treatment. Findings from a systematic review of osteoporosis interventions, a series of mixed-methods studies, and advice from experts in osteoporosis and human-factors engineering were used collectively to develop a multicomponent tool (targeted to family physicians and patients at risk for osteoporosis) that may support clinical decision making in osteoporosis disease management at the point of care. Methods A three-phased approach will be used to evaluate the osteoporosis tool. In phase 1, the tool will be implemented in three family practices. It will involve ensuring optimal functioning of the tool while minimizing disruption to usual practice. In phase 2, the tool will be pilot tested in a quasi-experimental interrupted time series (ITS) design to determine if it can improve osteoporosis disease management at the point of care. Phase 3 will involve conducting a qualitative postintervention follow-up study to better understand participants' experiences and perceived utility of the tool and readiness to adopt the tool at the point of care. Discussion The osteoporosis tool has the potential to make several contributions to the development and evaluation of complex, chronic disease interventions, such as the inclusion of an implementation strategy prior to conducting an evaluation study. Anticipated benefits of the tool may be to increase awareness for patients about osteoporosis and its associated risks and provide an opportunity to discuss a management plan with their physician, which may all facilitate patient self-management. PMID:21781318

  13. Sustainable WEE management in Malaysia: present scenarios and future perspectives

    NASA Astrophysics Data System (ADS)

    Rezaul Hasan Shumon, Md; Ahmed, S.

    2013-12-01

    Technological advances have resulted development of a lot of electronic products for continuously increasing number of customers. As the customer taste and features of these products change rapidly, the life cycles have come down tremendously. Therefore, a large volume of e-wastes are now emanated every year. This scenario is very much predominant in Malaysia. On one hand e-wastes are becoming environmental hazards and affecting the ecological imbalance. On the other, these wastes are remaining still economically valuable. In Malaysia, e-waste management system is still in its nascent state. This paper describes the current status of e-waste generation and recycling and explores issues for future e-waste management system in Malaysia from sustainable point of view. As to draw some factual comparisons, this paper reviews the e-waste management system in European Union, USA, Japan, as a benchmark. Then it focuses on understanding the Malaysian culture, consumer discarding behavior, flow of the materials in recycling, e-waste management system, and presents a comparative view with the Swiss e-waste system. Sustainable issues for e-waste management in Malaysia are also presented. The response adopted so far in collection and recovery activities are covered in later phases. Finally, it investigates the barriers and challenges of e-waste system in Malaysia.

  14. Research on a Defects Detection Method in the Ferrite Phase Shifter Cementing Process Based on a Multi-Sensor Prognostic and Health Management (PHM) System.

    PubMed

    Wan, Bo; Fu, Guicui; Li, Yanruoyue; Zhao, Youhu

    2016-08-10

    The cementing manufacturing process of ferrite phase shifters has the defect that cementing strength is insufficient and fractures always appear. A detection method of these defects was studied utilizing the multi-sensors Prognostic and Health Management (PHM) theory. Aiming at these process defects, the reasons that lead to defects are analyzed in this paper. In the meanwhile, the key process parameters were determined and Differential Scanning Calorimetry (DSC) tests during the cure process of resin cementing were carried out. At the same time, in order to get data on changing cementing strength, multiple-group cementing process tests of different key process parameters were designed and conducted. A relational model of cementing strength and cure temperature, time and pressure was established, by combining data of DSC and process tests as well as based on the Avrami formula. Through sensitivity analysis for three process parameters, the on-line detection decision criterion and the process parameters which have obvious impact on cementing strength were determined. A PHM system with multiple temperature and pressure sensors was established on this basis, and then, on-line detection, diagnosis and control for ferrite phase shifter cementing process defects were realized. It was verified by subsequent process that the on-line detection system improved the reliability of the ferrite phase shifter cementing process and reduced the incidence of insufficient cementing strength defects.

  15. Managing the Implementation of Mission Operations Automation

    NASA Technical Reports Server (NTRS)

    Sodano, R.; Crouse, P.; Odendahl, S.; Fatig, M.; McMahon, K.; Lakin, J.

    2006-01-01

    Reducing the cost of mission operations has necessitated a high level of automation both on spacecraft and ground systems. While automation on spacecraft is implemented during the design phase, ground system automation tends to be implemented during the prime mission operations phase. Experience has shown that this tendency for late automation development can be hindered by several factors: additional hardware and software resources may need to be procured; software must be developed and tested on a non-interference basis with primary operations with limited manpower; and established procedures may not be suited for automation requiring substantial rework. In this paper we will review the experience of successfully automating mission operations for seven on-orbit missions: the Compton Gamma Ray Observatory (CGRO), the Rossi X-Ray Timing Explorer (RXTE), the Advanced Composition Explorer (ACE), the Far Ultraviolet Spectroscopic Explorer (FUSE), Interplanetary Physics Laboratory (WIND), Polar Plasma Laboratory (POLAR), and the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE). We will provide lessons learned in areas such as: spacecraft recorder management, procedure development, lights out commanding from the ground system vs. stored command loads, spacecraft contingency response time, and ground station interfaces. Implementing automation strategies during the mission concept and spacecraft integration and test phase as the most efficient method will be discussed.

  16. Study of Critical Heat Flux and Two-Phase Pressure Drop Under Reduced Gravity

    NASA Technical Reports Server (NTRS)

    Abdollahian, Davood; Quintal, Joseph; Barez, Fred; Zahm, Jennifer; Lohr, Victor

    1996-01-01

    The design of the two-phase flow systems which are anticipated to be utilized in future spacecraft thermal management systems requires a knowledge of two-phase flow and heat transfer phenomena in reduced gravities. This program was funded by NASA headquarters in response to NRA-91-OSSA-17 and was managed by Lewis Research Center. The main objective of this program was to design and construct a two-phase test loop, and perform a series of normal gravity and aircraft trajectory experiments to study the effect of gravity on the Critical Heat Flux (CHF) and onset of instability. The test loop was packaged on two aircraft racks and was also instrumented to generate data for two-phase pressure drop. The normal gravity tests were performed with vertical up and downflow configurations to bound the effect of gravity on the test parameters. One set of aircraft trajectory tests was performed aboard the NASA DC-9 aircraft. These tests were mainly intended to evaluate the test loop and its operational performance under actual reduced gravity conditions, and to produce preliminary data for the test parameters. The test results were used to demonstrate the applicability of the normal gravity models for prediction of the two-phase friction pressure drop. It was shown that the two-phase friction multipliers for vertical upflow and reduced gravity conditions can be successfully predicted by the appropriate normal gravity models. Limited critical heat flux data showed that the measured CHF under reduced gravities are of the same order of magnitude as the test results with vertical upflow configuration. A simplified correlation was only successful in predicting the measured CHF for low flow rates. Instability tests with vertical upflow showed that flow becomes unstable and critical heat flux occurs at smaller powers when a parallel flow path exists. However, downflow tests and a single reduced gravity instability experiment indicated that the system actually became more stable with a parallel single-phase flow path. Several design modifications have been identified which will improve the system performance for generating reduced gravity data. The modified test loop can provide two-phase flow data for a range of operating conditions and can serve as a test bed for component evaluation.

  17. Rocketdyne automated dynamics data analysis and management system

    NASA Technical Reports Server (NTRS)

    Tarn, Robert B.

    1988-01-01

    An automated dynamics data analysis and management systems implemented on a DEC VAX minicomputer cluster is described. Multichannel acquisition, Fast Fourier Transformation analysis, and an online database have significantly improved the analysis of wideband transducer responses from Space Shuttle Main Engine testing. Leakage error correction to recover sinusoid amplitudes and correct for frequency slewing is described. The phase errors caused by FM recorder/playback head misalignment are automatically measured and used to correct the data. Data compression methods are described and compared. The system hardware is described. Applications using the data base are introduced, including software for power spectral density, instantaneous time history, amplitude histogram, fatigue analysis, and rotordynamics expert system analysis.

  18. Asterism: an integrated, complete, and open-source approach for running seismologist continuous data-intensive analysis on heterogeneous systems

    NASA Astrophysics Data System (ADS)

    Ferreira da Silva, R.; Filgueira, R.; Deelman, E.; Atkinson, M.

    2016-12-01

    We present Asterism, an open source data-intensive framework, which combines the Pegasus and dispel4py workflow systems. Asterism aims to simplify the effort required to develop data-intensive applications that run across multiple heterogeneous resources, without users having to: re-formulate their methods according to different enactment systems; manage the data distribution across systems; parallelize their methods; co-place and schedule their methods with computing resources; and store and transfer large/small volumes of data. Asterism's key element is to leverage the strengths of each workflow system: dispel4py allows developing scientific applications locally and then automatically parallelize and scale them on a wide range of HPC infrastructures with no changes to the application's code; Pegasus orchestrates the distributed execution of applications while providing portability, automated data management, recovery, debugging, and monitoring, without users needing to worry about the particulars of the target execution systems. Asterism leverages the level of abstractions provided by each workflow system to describe hybrid workflows where no information about the underlying infrastructure is required beforehand. The feasibility of Asterism has been evaluated using the seismic ambient noise cross-correlation application, a common data-intensive analysis pattern used by many seismologists. The application preprocesses (Phase1) and cross-correlates (Phase2) traces from several seismic stations. The Asterism workflow is implemented as a Pegasus workflow composed of two tasks (Phase1 and Phase2), where each phase represents a dispel4py workflow. Pegasus tasks describe the in/output data at a logical level, the data dependency between tasks, and the e-Infrastructures and the execution engine to run each dispel4py workflow. We have instantiated the workflow using data from 1000 stations from the IRIS services, and run it across two heterogeneous resources described as Docker containers: MPI (Container2) and Storm (Container3) clusters (Figure 1). Each dispel4py workflow is mapped to a particular execution engine, and data transfers between resources are automatically handled by Pegasus. Asterism is freely available online at http://github.com/dispel4py/pegasus_dispel4py.

  19. On-board fault management for autonomous spacecraft

    NASA Technical Reports Server (NTRS)

    Fesq, Lorraine M.; Stephan, Amy; Doyle, Susan C.; Martin, Eric; Sellers, Suzanne

    1991-01-01

    The dynamic nature of the Cargo Transfer Vehicle's (CTV) mission and the high level of autonomy required mandate a complete fault management system capable of operating under uncertain conditions. Such a fault management system must take into account the current mission phase and the environment (including the target vehicle), as well as the CTV's state of health. This level of capability is beyond the scope of current on-board fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems. This presentation will discuss work in progress at TRW to apply artificial intelligence to the problem of on-board fault management. The goal of this work is to develop fault management systems that can meet the needs of spacecraft that have long-range autonomy requirements. We have implemented a model-based approach to fault detection and isolation that does not require explicit characterization of failures prior to launch. It is thus able to detect failures that were not considered in the failure and effects analysis. We have applied this technique to several different subsystems and tested our approach against both simulations and an electrical power system hardware testbed. We present findings from simulation and hardware tests which demonstrate the ability of our model-based system to detect and isolate failures, and describe our work in porting the Ada version of this system to a flight-qualified processor. We also discuss current research aimed at expanding our system to monitor the entire spacecraft.

  20. International Space Station United States Laboratory Module Water Recovery Management Subsystem Verification from Flight 5A to Stage ULF2

    NASA Technical Reports Server (NTRS)

    Williams, David E.; Labuda, Laura

    2009-01-01

    The International Space Station (ISS) Environmental Control and Life Support (ECLS) system comprises of seven subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), Vacuum System (VS), Water Recovery and Management (WRM), and Waste Management (WM). This paper provides a summary of the nominal operation of the United States (U.S.) Laboratory Module WRM design and detailed element methodologies utilized during the Qualification phase of the U.S. Laboratory Module prior to launch and the Qualification of all of the modification kits added to it from Flight 5A up and including Stage ULF2.

  1. Crew interface specifications preparation for in-flight maintenance and stowage functions

    NASA Technical Reports Server (NTRS)

    Parker, F. W.; Carlton, B. E.

    1972-01-01

    The findings and data products developed during the Phase 2 crew interface specification study are presented. Five new NASA general specifications were prepared: operations location coding system for crew interfaces; loose equipment and stowage management requirements; loose equipment and stowage data base information requirements; spacecraft loose equipment stowage drawing requirements; and inflight stowage management data requirements. Additional data was developed defining inflight maintenance processes and related data concepts for inflight troubleshooting, remove/repair/replace and scheduled maintenance activities. The process of maintenance task and equipment definition during spacecraft design and development was also defined and related data concepts were identified for futher development into formal NASA specifications during future follow-on study phases of the contract.

  2. Edema: a silent but important factor.

    PubMed

    Villeco, June P

    2012-01-01

    Edema is a normal response to injury. Even the smallest injury is associated with some inflammation, and initial edema is part of the normal inflammatory process. However, edema becomes a concern when it persists beyond the inflammatory phase. Once we have progressed into the rebuilding, or fibroplastic phase of healing, edema will delay healing and contribute to complications such as pain and stiffness. Early prevention and management to prevent this progression are therefore critical. This article discusses edema in relation to stages of healing and presents the research behind techniques available to the clinician to manage localized extracellular upper extremity edema in the patient with an intact lymphatic system. Copyright © 2012 Hanley & Belfus. Published by Elsevier Inc. All rights reserved.

  3. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  4. Integrated Training System for Air Force On-the-Job Training: Specification Development. Final Technical Paper.

    ERIC Educational Resources Information Center

    Carson, Stuart B.; And Others.

    The Air Force conducted this study for two purposes: (1) to define the system of Air Force On-the-Job Training (OJT); and (2) to prepare a set of functional specifications for an integrated, base-level OJT evaluation and management system with linkages to the Major Commands and Air Staff. The study was conducted in four phases. During the first…

  5. Planning for successful outcomes in the new millennium.

    PubMed

    Matthews, P

    2000-02-01

    The complexity of the health care environment will increase in the next millennium. Organizations must adopt an approach of selecting outcomes management solutions that are focused on data capture, analysis, and comparative reviews and reporting. They must decisively and creatively implement, in a phased approach, integrated solutions from existing robust systems, while considering future systems targeted for implementation. Outcomes management solutions must be integrated with the organization's information systems strategic plan. The successful organization must be able to turn business-critical data into information that supports both business and clinical decision-making activities. In short, health care organizations will have to become information-driven.

  6. Radiation Hardness Assurance (RHA) for Space Systems

    NASA Technical Reports Server (NTRS)

    Poivey, Christian; Buchner, Stephen

    2007-01-01

    This presentation discusses radiation hardness assurance (RHA) for space systems, providing both the programmatic aspects of RHA and the RHA procedure. RHA consists of all activities undertaken to ensure that the electronics and materials of a space system perform to their design specifications after exposure to the space radiation environment. RHA also pertains to environment definition, part selection, part testing, spacecraft layout, radiation tolerant design, and mission/system/subsystems requirements. RHA procedure consists of establishing mission requirements, defining and evaluating the radiation hazard, selecting and categorizing the appropriate parts, and evaluating circuit response to hazard. The RHA approach is based on risk management and is confined only to parts, it includes spacecraft layout, system/subsystem/circuit design, and system requirements and system operations. RHA should be taken into account in the early phases of a program including the proposal and feasibility analysis phases.

  7. Data management of clinical trials during an outbreak of Ebola virus disease.

    PubMed

    Hossmann, Stefanie; Haynes, Alan G; Spoerri, Adrian; Diatta, Ibrahima Dina; Aboubacar, Barry; Egger, Matthias; Rintelen, Felix; Trelle, Sven

    2017-10-23

    Clinical trial data management (DM) conducted during outbreaks like that of Ebola virus disease (EVD) in West Africa, 2014-2016, has to adapt to specific, unique circumstances. CTU Bern was asked to set up a safe data capture/management system that could be launched within a few weeks and cover two different vaccine trials. This article describes some of the challenges we faced and our solutions during the two different trials. Setting up a DM system was split into four phases/tasks: (1) quick set-up of the (electronic) data capture system (EDC) and mobile infrastructure in Bern, (2) moving the EDC and infrastructure to Conakry, Guinea and implementation of a local data management centre (DMC), (3) running the DMC, and (4) data cleaning. The DMC had to meet the following criteria: (1) quick implementation, (2) efficient maintenance and handling of data, and (3) procedures to guarantee data quality. The EDC (REDCap) was setup as a local area network. In order to ensure high data quality, double data entry, and then review of inconsistencies and offline plausibility checks were implemented. From the start of CTU Bern's involvement to the productive EDC took 11 weeks. It was necessary to adapt processes for dealing with data continuously throughout the trial conduct phase. The data management team processed 171,794 case report form pages from a total of 14,203 participants in the period between March and December 2015. Data management is a key task supporting trial conduct. For trials in emergency situations, many of our approaches are suitable, but we also provide a list of aspects that might be done differently. Copyright © 2017. Published by Elsevier Ltd.

  8. A Cost and Performance System (CAPS) in a Federal agency

    NASA Technical Reports Server (NTRS)

    Huseonia, W. F.; Penton, P. G.

    1994-01-01

    Cost and Performance System (CAPS) is an automated system used from the planning phase through implementation to analysis and documentation. Data is retrievable or available for analysis of cost versus performance anomalies. CAPS provides a uniform system across intra- and international elements. A common system is recommended throughout an entire cost or profit center. Data can be easily accumulated and aggregated into higher levels of tracking and reporting of cost and performance.The level and quality of performance or productivity is indicated in the CAPS model and its process. The CAPS model provides the necessary decision information and insight to the principal investigator/project engineer for a successful project management experience. CAPS provides all levels of management with the appropriate detailed level of data.

  9. Results of phase one of land use information Delphi study

    NASA Technical Reports Server (NTRS)

    Paul, C. K.; Landini, A. J.

    1975-01-01

    The Land Use Management Information System (LUMIS) is being developed for the city portion of the Santa Monica mountains. LUMIS incorporates data developed from maps and aerial photos as well as traditional land based data associated with routine city and county record keeping activities and traditional census data. To achieve the merging of natural resource data with governmental data LUMIS is being designed in accordance with restrictions associated with two other land use information systems currently being constructed by Los Angeles city staff. The two city systems are LUPAMS (Land Use Planning and Management System) which is based on data recorded by the County Assessor's office for each individual parcel of land in the city, and Geo-BEDS, a geographically based environmental data system.

  10. A remote sensing and GIS-enabled asset management system (RS-GAMS) : phase 2.

    DOT National Transportation Integrated Search

    2014-04-01

    Under the U.S. Department of Transportation (DOT) Commercial Remote Sensing and Spatial : Information (CRS&SI) Technology Initiative 2 of the Transportation Infrastructure Construction : and Condition Assessment, an intelligent Remote Sensing and GIS...

  11. Leadership and management training as a catalyst to health system strengthening in low-income settings: Evidence from implementation of the Zambia Management and Leadership course for district health managers in Zambia.

    PubMed

    Mutale, Wilbroad; Vardoy-Mutale, Anne-Thora; Kachemba, Arthur; Mukendi, Roman; Clarke, Kupela; Mulenga, Dennis

    2017-01-01

    Research has shown that the modes of leadership and management may influence health outcomes. However, majority of health leaders and managers in many low-income countries are promoted on account of clinical expertise. It has been recognised that these new managers are often ill-prepared for managing complex health systems. In response to this challenge, the Zambian Ministry of Health (MoH) has developed the Governance and Management Capacity Building (GMCB) Strategic Plan (2012-2016), whose overarching goal is to improve health sector governance and create an environment that is result-oriented, accountable and transparent. This led to the introduction of a new in-service leadership and management course, which has come to be known as the Zambia Management and Leadership Academy (ZMLA). This paper presents the results of an impact evaluation of the ZMLA programme conducted in 2014. This was a cross-sectional mixed method study. The study targeted health workers, stakeholders and course implementers. ZMLA trainees were targeted to gain perspectives on the extent to which the programme affected levels of self-confidence resulting from knowledge gained. Perspectives were sought from both ZMLA and non ZMLA trainees to measure changes in the work environment. Stakeholder perspectives were collected from trainers and key informants involved in providing ZMLA training. On average, knowledge levels increased by 38% after each workshop. A comparison of the average self-rated scores from 444 management and leadership survey responses before ZMLA and after ZMLA training showed a significant increase in the proportion of participants that felt adequately trained to undertake management and leadership, from 63% (before) to 99% (after) in phase 1 and 43% (before) to 98% (after) in the phase II cohort. The calculated before and after percentage change for work environment themes ranged from 5.8% to 13.4%. Majority of respondents perceived improvements in the workplace environment, especially in handling human resource management matters. The smallest improvement was noted in ethics and accountability. Qualitative interviews showed improvements in the meeting culture and a greater appreciation for the importance of meetings. Shared vision, teamwork and coordination seemed to have improved more in work places where the overall manager had received ZMLA training. Leadership and management training will be a key ingredient in health system strengthening in low-income settings. The ZMLA model was found to be acceptable and effective in improving knowledge and skills for health system managers with minimal disruption to health services.

  12. BALTEX—an interdisciplinary research network for the Baltic Sea region

    NASA Astrophysics Data System (ADS)

    Reckermann, Marcus; Langner, Joakim; Omstedt, Anders; von Storch, Hans; Keevallik, Sirje; Schneider, Bernd; Arheimer, Berit; Markus Meier, H. E.; Hünicke, Birgit

    2011-10-01

    BALTEX is an environmental research network dealing with the Earth system of the entire Baltic Sea drainage basin. Important elements include the water and energy cycle, climate variability and change, water management and extreme events, and related impacts on biogeochemical cycles. BALTEX was founded in 1993 as a GEWEX continental-scale experiment and is currently in its second 10 yr phase. Phase I (1993-2002) was primarily dedicated to hydrological, meteorological and oceanographic processes in the Baltic Sea drainage basin, hence mostly dealt with the physical aspects of the system. Scientific focus was on the hydrological cycle and the exchange of energy between the atmosphere, the Baltic Sea and the surface of its catchment. The BALTEX study area was hydrologically defined as the Baltic Sea drainage basin. The second 10 yr phase of BALTEX (Phase II: 2003-12) has strengthened regional climate research, water management issues, biogeochemical cycles and overarching efforts to reach out to stakeholders and decision makers, as well as to foster communication and education. Achievements of BALTEX Phase II have been the establishment of an assessment report of regional climate change and its impacts on the Baltic Sea basin (from hydrological to biological and socio-economic), the further development of regional physical climate models and the integration of biogeochemical and ecosystem models. BALTEX features a strong infrastructure, with an international secretariat and a publication series, and organizes various workshops and conferences. This article gives an overview of the BALTEX programme, with an emphasis on Phase II, with some examples from BALTEX-related research.

  13. Base of the upper layer of the phase-three Elkhorn-Loup groundwater-flow model, north-central Nebraska

    USGS Publications Warehouse

    Stanton, Jennifer S.

    2013-01-01

    The Elkhorn and Loup Rivers in Nebraska provide water for irrigation, recreation, hydropower produc­tion, aquatic life, and municipal water systems for the Omaha and Lincoln metropolitan areas. Groundwater is another important resource in the region and is extracted primarily for agricultural irrigation. Water managers of the area are interested in balancing and sustaining the long-term uses of these essential surface-water and groundwater resources. Thus, a cooperative study was established in 2006 to compile reliable data describing hydrogeologic properties and water-budget components and to improve the understanding of stream-aquifer interactions in the Elkhorn and Loup River Basins. A groundwater-flow model was constructed as part of the first two phases of that study as a tool for under­standing the effect of groundwater pumpage on stream base flow and the effects of management strategies on hydrologically connected groundwater and surface-water supplies. The third phase of the study was implemented to gain additional geologic knowledge and update the ELM with enhanced water-budget information and refined discretization of the model grid and stress periods. As part of that effort, the ELM is being reconstructed to include two vertical model layers, whereas phase-one and phase-two simulations represented the aquifer system using one vertical model layer. This report presents a map of and methods for developing the elevation of the base of the upper model layer for the phase-three ELM. Digital geospatial data of elevation contours and geologic log sites used to esti­mate elevation contours are available as part of this report.

  14. Radiologic Monitoring of Faculty and Staff in an Electrophysiology Lab Using a Real-Time Dose Monitoring System

    ERIC Educational Resources Information Center

    Chardenet, Kathleen A.

    2016-01-01

    Purpose: A real-time dose management system was used to determine if radiation exposure levels would decrease when providers were privy to their real-time radiation exposure levels. Six aggregate categories of providers were first blinded (phase 1) and subsequently made aware of their radiation exposure levels during electrophysiology procedures…

  15. Operating a petabyte class archive at ESO

    NASA Astrophysics Data System (ADS)

    Suchar, Dieter; Lockhart, John S.; Burrows, Andrew

    2008-07-01

    The challenges of setting up and operating a Petabyte Class Archive will be described in terms of computer systems within a complex Data Centre environment. The computer systems, including the ESO Primary and Secondary Archive and the associated computational environments such as relational databases will be explained. This encompasses the entire system project cycle, including the technical specifications, procurement process, equipment installation and all further operational phases. The ESO Data Centre construction and the complexity of managing the environment will be presented. Many factors had to be considered during the construction phase, such as power consumption, targeted cooling and the accumulated load on the building structure to enable the smooth running of a Petabyte class Archive.

  16. Development of an Ultrasonic Phased Array System for Wellbore Integrity Evaluation and Near-Wellbore Fracture Network Mapping of Injection and Production Wells in Geothermal Energy Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Almansouri, Hani; Foster, Benjamin; Kisner, Roger A

    2016-01-01

    This paper documents our progress developing an ultrasound phased array system in combination with a model-based iterative reconstruction (MBIR) algorithm to inspect the health of and characterize the composition of the near-wellbore region for geothermal reservoirs. The main goal for this system is to provide a near-wellbore in-situ characterization capability that will significantly improve wellbore integrity evaluation and near well-bore fracture network mapping. A more detailed image of the fracture network near the wellbore in particular will enable the selection of optimal locations for stimulation along the wellbore, provide critical data that can be used to improve stimulation design, andmore » provide a means for measuring evolution of the fracture network to support long term management of reservoir operations. Development of such a measurement capability supports current hydrothermal operations as well as the successful demonstration of Engineered Geothermal Systems (EGS). The paper will include the design of the phased array system, the performance specifications, and characterization methodology. In addition, we will describe the MBIR forward model derived for the phased array system and the propagation of compressional waves through a pseudo-homogenous medium.« less

  17. Gravity Effects in Microgap Flow Boiling

    NASA Technical Reports Server (NTRS)

    Robinson, Franklin; Bar-Cohen, Avram

    2017-01-01

    Increasing integration density of electronic components has exacerbated the thermal management challenges facing electronic system developers. The high power, heat flux, and volumetric heat generation of emerging devices are driving the transition from remote cooling, which relies on conduction and spreading, to embedded cooling, which facilitates direct contact between the heat-generating device and coolant flow. Microgap coolers employ the forced flow of dielectric fluids undergoing phase change in a heated channel between devices. While two phase microcoolers are used routinely in ground-based systems, the lack of acceptable models and correlations for microgravity operation has limited their use for spacecraft thermal management. Previous research has revealed that gravitational acceleration plays a diminishing role as the channel diameter shrinks, but there is considerable variation among the proposed gravity-insensitive channel dimensions and minimal research on rectangular ducts. Reliable criteria for achieving gravity-insensitive flow boiling performance would enable spaceflight systems to exploit this powerful thermal management technique and reduce development time and costs through reliance on ground-based testing. In the present effort, the authors have studied the effect of evaporator orientation on flow boiling performance of HFE7100 in a 218 m tall by 13.0 mm wide microgap cooler. Similar heat transfer coefficients and critical heat flux were achieved across five evaporator orientations, indicating that the effect of gravity was negligible.

  18. Interactive effects of altitude and management on resistance and resilience of permanent grasslands to drought: combining agronomic, functional and ecophysiological approaches Buttler, A., Deleglise, C., Signarbieux, C., Meisser, M., Mosimann, E., Mills, R.

    NASA Astrophysics Data System (ADS)

    Buttler, A.; Deléglise, C.; Signarbieux, C.; Meisser, M.; Mosimann, E.; Mills, R.; Risch, A.; Vitra, A.; Delzon, S.

    2015-12-01

    The expected increase in extreme climatic events will cause significant constraints on grassland systems and, as a result, farmers must adapt grassland management. Identifying potential interactive effects of factors such as altitude and management, with different water availability scenarios is therefore a major challenge to anticipate the performance of mountain grasslands. Using rain shelters across grassland systems in the Swiss Jura, we simulated the effects of severe droughts in spring and summer periods, at different altitudes, and compared realistic management types such as grazing by sheep, and intensive and extensive mowing. When comparing grazing and mowing management under an extreme drought event at a similar altitude, minor short-term changes of species composition, and almost no persistent effects were observed. However, significant changes were observed in plant functional traits, reflecting a strong decline in plant growth during the drought, and a partial recovery two months later. Forage yields, and its nutritive value, thus declined during the drought period, and both were still affected in the following months, but had recovered in the following spring. Negative drought effects were stronger in the grazing management, although recovery was slightly improved in this management. Concerning soil biogeochemistry, we compared microbial biomass C and N, as well as the activity of extracellular enzymes at peak drought, and during the rewet phase. Both indices remained comparable to control treatments under drought. During the rewet phase, some enzymes were stimulated in the grazed-control, but microbial biomass remained comparable. These systems showed considerable resistance to extreme drought, with only minor short term impacts due to management. However, cascading effects from the aboveground to belowground function may be observed if such events increase in frequency and these processes are expected to be different at the various altitudes.

  19. Central Inertial and GPS Test Facility (CIGTF) Customer Handbook

    DTIC Science & Technology

    2007-08-01

    capabilities offer the customer a cost-effective means to evaluate their guidance and navigation systems. The 746 TS also manages the tri-service GPS...minimum your test manager ur test or current phase of testing is complete. 4.0 Customer Feedback The 746 TS works very hard to provide its customers ... Customer Handbook August 2007 HOLLOMAN AFB, NEW MEXICO Distribution Statement A Approved for public release: distribution is

  20. Predictors of Short- and Long-Term Attrition From the Parents as Agents of Change Randomized Controlled Trial for Managing Pediatric Obesity.

    PubMed

    Spence, Nicholas D; Newton, Amanda S; Keaschuk, Rachel A; Ambler, Kathryn A; Jetha, Mary M; Holt, Nicholas L; Rosychuk, Rhonda J; Spence, John C; Sharma, Arya M; Ball, Geoff D C

    Attrition in pediatric weight management is a substantial problem. This study examined factors associated with short- and long-term attrition from a lifestyle and behavioral intervention for parents of children with overweight or obesity. Fifty-two families with children ages 6 to 12 years old and body mass index at or above the 85th percentile participated in a randomized controlled trial focused on parents, comparing parent-based cognitive behavioral therapy with parent-based psychoeducation for pediatric weight management. We examined program attrition using two clinical phases of the intervention: short-term and long-term attrition, modeled using the general linear model. Predictors included intervention type, child/parent weight status, sociodemographic factors, and health of the family system. Higher self-assessed health of the family system was associated with lower short-term attrition; higher percentage of intervention sessions attended by parents was associated with lower long-term attrition. Different variables were significant in our short- and long-term models. Attrition might best be conceptualized based on short- and long-term phases of clinical, parent-based interventions for pediatric weight management. Copyright © 2016 National Association of Pediatric Nurse Practitioners. Published by Elsevier Inc. All rights reserved.

  1. Perineal hygiene in patients with pelvic fractures.

    PubMed

    Hossain, Mohammad A; Pearce, Rachel; Bircher, Martin D

    2008-08-01

    At the tertiary referral Orthopaedic Unit of St. Georges Hospital, it was noted that there was an unacceptably high number of soiled perinea in patients transferred from Base Hospitals. This not only exposed the patients to increased infection [Jepsen O. The effectiveness of preoperative skin preparations: an integrated review of the literature. AORN J 1993;58:477-82; and Nix D, Ermer-Seltun J. A review of perineal skin care protocols and skin barrier product use. Ostomy Wound Manage 2004;50:59-67] but was also undignified and unacceptable for them. We decided to audit the problem with a view to finding out why this was happening and to improve the situation. A 2-year study was carried out over three distinct phases (phase 1: February-June 2004, phase 2: July-November 2004, phase 3: February-November 2005). Observations of soiling were recorded in a questionnaire by the surgeon prior to surgery. Key system and clinical guidelines were implemented during the second phase, and the audit process was repeated. The percentage of clean perinea in phase 1 was 32%, phase 2 68% and phase 3 99.5% indicating a clear improvement in the overall system.

  2. Screening for Psychopathology Versus Selecting for Suitability: Ethical and Legal Considerations

    NASA Technical Reports Server (NTRS)

    Holland, Albert W.; Galarza, Laura; Arvey, Richard; Hysong, Sylvia; Sackett, Paul; Cascio, Wayne

    2000-01-01

    The current system for psychological selection of U.S. astronauts is divided into two phases: The select-out phase and the select-in phase. The select-out phase screens candidates for psychopathology; candidates who do not meet the baseline psychiatric requirements are immediately disqualified. The select-in phase assesses candidates for suitability to fly short- and long-duration missions. Suitability ratings are given for ten factors found to be critical for short and long-duration space missions. There are qualitative differences in the purpose of the two phases (select-in vs. select-out) and in the nature of the information collected in each phase. Furthermore, there are different logistic, ethical, and legal issues related to a medical or psychiatric (select-out) screening versus a suitability (select-in) psychological screening process . The purpose of this presentation is to contrast the ethical and legal environment surrounding the select-out and select-in phases of the psychological selection system. Issues such as data collection, data storage and management, the federal statutory environment, and personnel training will be discussed. Further, a summary of the new standards for psychological testing is presented, along with their implications for astronaut selection.

  3. Phase contrast imaging of cochlear soft tissue.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, S.; Hwang, M.; Rau, C.

    A noninvasive technique to image soft tissue could expedite diagnosis and disease management in the auditory system. We propose inline phase contrast imaging with hard X-rays as a novel method that overcomes the limitations of conventional absorption radiography for imaging soft tissue. In this study, phase contrast imaging of mouse cochleae was performed at the Argonne National Laboratory Advanced Photon Source. The phase contrast tomographic reconstructions show soft tissue structures of the cochlea, including the inner pillar cells, the inner spiral sulcus, the tectorial membrane, the basilar membrane, and the Reissner's membrane. The results suggest that phase contrast X-ray imagingmore » and tomographic techniques hold promise to noninvasively image cochlear structures at an unprecedented cellular level.« less

  4. Reliability Analysis of RSG-GAS Primary Cooling System to Support Aging Management Program

    NASA Astrophysics Data System (ADS)

    Deswandri; Subekti, M.; Sunaryo, Geni Rina

    2018-02-01

    Multipurpose Research Reactor G.A. Siwabessy (RSG-GAS) which has been operating since 1987 is one of the main facilities on supporting research, development and application of nuclear energy programs in BATAN. Until now, the RSG-GAS research reactor has been successfully operated safely and securely. However, because it has been operating for nearly 30 years, the structures, systems and components (SSCs) from the reactor would have started experiencing an aging phase. The process of aging certainly causes a decrease in reliability and safe performances of the reactor, therefore the aging management program is needed to resolve the issues. One of the programs in the aging management is to evaluate the safety and reliability of the system and also screening the critical components to be managed.One method that can be used for such purposes is the Fault Tree Analysis (FTA). In this papers FTA method is used to screening the critical components in the RSG-GAS Primary Cooling System. The evaluation results showed that the primary isolation valves are the basic events which are dominant against the system failure.

  5. Novel thermal management system using boiling cooling for high-powered lithium-ion battery packs for hybrid electric vehicles

    NASA Astrophysics Data System (ADS)

    Al-Zareer, Maan; Dincer, Ibrahim; Rosen, Marc A.

    2017-09-01

    A thermal management system is necessary to control the operating temperature of the lithium ion batteries in battery packs for electrical and hybrid electrical vehicles. This paper proposes a new battery thermal management system based on one type of phase change material for the battery packs in hybrid electrical vehicles and develops a three dimensional electrochemical thermal model. The temperature distributions of the batteries are investigated under various operating conditions for comparative evaluations. The proposed system boils liquid propane to remove the heat generated by the batteries, and the propane vapor is used to cool the part of the battery that is not covered with liquid propane. The effect on the thermal behavior of the battery pack of the height of the liquid propane inside the battery pack, relative to the height of the battery, is analyzed. The results show that the propane based thermal management system provides good cooling control of the temperature of the batteries under high and continuous charge and discharge cycles at 7.5C.

  6. Transportation informatics : an image analysis system for managing transportation facilities - phase II.

    DOT National Transportation Integrated Search

    2012-02-01

    One of the most important tasks in maintaining transportation facilities such as highways : and streets is the evaluation of the existing condition. Visual evaluation by human : inspectors is subjective in nature, therefore has issues of consistency ...

  7. A system dynamics model of a large R&D program

    NASA Astrophysics Data System (ADS)

    Ahn, Namsung

    Organizations with large R&D activities must deal with a hierarchy of decision regarding resource allocation. At the highest level of allocation, the decision is related to the total allocation to R&D as some portion of revenue. The middle level of allocation deals with the allocation among phases of the R&D process. The lowest level of decisions relates to the resource allocation to specific projects within a specific phase. This study focuses on developing an R&D model to deal with the middle level of allocation, i.e., the allocation among phases of research such as basic research, development, and demonstration. The methodology used to develop the R&D model is System Dynamics. Our modeling concept is innovative in representing each phase of R&D as consisting of two parts: projects under way, and an inventory of successful but not-yet- exploited projects. In a simple world, this concept can yield an exact analytical solution for allocation of resources among phases. But in a real world, the concept should be improved by adding more complex structures with nonlinear behaviors. Two particular nonlinear feedbacks are incorporated into the R&D model. The probability of success for any specific project is assumed partly dependent upon resources allocated to the project. Further, the time required to reach a conclusion regarding the success or failure of a project is also assumed dependent upon the level of resources allocated. In addition, the number of successful projects partly depends on the inventory of potential ideas in the previous stage that can be exploited. This model can provide R&D management with insights into the effect of changing allocations to phases whether those changes are internally or externally driven. With this model, it is possible to study the effectiveness of management decisions in a continuous fashion. Managers can predict payoffs for a host of different policies. In addition, as new research results accumulate, a re- assessment of program goals can be implemented easily and allocations adjusted to enhance continuously the likelihood of success, and to optimize payoffs. Finally, this model can give managers a quantitative rationale for program evaluation and permit the quantitative assessment of various externally imposed changes. (Copies available exclusively from MIT Libraries, Rm. 14-0551, Cambridge, MA 02139-4307. Ph. 617-253-5668; Fax 617-253-1690.)

  8. Configuration Management Process Assessment Strategy

    NASA Technical Reports Server (NTRS)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  9. System impairment compensation in coherent optical communications by using a bio-inspired detector based on artificial neural network and genetic algorithm

    NASA Astrophysics Data System (ADS)

    Wang, Danshi; Zhang, Min; Li, Ze; Song, Chuang; Fu, Meixia; Li, Jin; Chen, Xue

    2017-09-01

    A bio-inspired detector based on the artificial neural network (ANN) and genetic algorithm is proposed in the context of a coherent optical transmission system. The ANN is designed to mitigate 16-quadrature amplitude modulation system impairments, including linear impairment: Gaussian white noise, laser phase noise, in-phase/quadrature component imbalance, and nonlinear impairment: nonlinear phase. Without prior information or heuristic assumptions, the ANN, functioning as a machine learning algorithm, can learn and capture the characteristics of impairments from observed data. Numerical simulations were performed, and dispersion-shifted, dispersion-managed, and dispersion-unmanaged fiber links were investigated. The launch power dynamic range and maximum transmission distance for the bio-inspired method were 2.7 dBm and 240 km greater, respectively, than those of the maximum likelihood estimation algorithm. Moreover, the linewidth tolerance of the bio-inspired technique was 170 kHz greater than that of the k-means method, demonstrating its usability for digital signal processing in coherent systems.

  10. Propellant Feed Subsystem for a 26 kW flight arcjet propulsion system

    NASA Astrophysics Data System (ADS)

    Vaughan, C. E.; Morris, J. P.

    1993-06-01

    The USAF arcjet ATTD program demanded the development of a low-cost ammonia Propellant Feed Subsystem (PFS). A flow rate of 240 +/- 5 mg/sec during a total of ten 15-min ammonia outflows was required for the flight mission. The precision of the flow tolerance required a departure from the design of previous ammonia propellant feed systems. Since a propellant management device was not used, thermocapillary forces were explored as a means to limit outflow of liquid phase ammonia. A high energy density feedline heater with an internal wick was developed to guarantee that only gas phase propellant would reach the arcjet. A digital control algorithm was developed to implement bang-bang control of mass flow rate metered by a sonic venturi. Development tests of this system have been completed. The system is capable of continuous gas phase outflows regardless of orientation. Integrated tests with the arcjet and power conditioning unit have also been successfully completed.

  11. Phosphorus removal from Everglades agricultural area runoff by submerged aquatic vegetation/limerock treatment technology: an overview of research.

    PubMed

    Gu, B; DeBusk, T A; Dierberg, F E; Chimney, M J; Pietro, K C; Aziz, T

    2001-01-01

    The 1994 Everglades Forever Act mandates the South Florida Water Management District and the Florida Department of Environmental Protection to evaluate a series of advanced treatment technologies to reduce total phosphorus (TP) in Everglades Agricultural Area runoff to a threshold target level. A submerged aquatic vegetation/limerock (SAV/LR) treatment system is one of the technologies selected for evaluation. The research program consists of two phases. Phase I examined the efficiency of SAV/LR treatment system for TP removal at the mesocosm scale. Preliminary results demonstrate that this technology is capable of reducing effluent TP to as low as 10 microg/L under constant flows. The SAV component removes the majority of the influent soluble reactive P, while the limerock component removes a portion of the particulate P. Phase II is a multi-scale project (i.e., microcosms, mesocosms, test cells and full-size wetlands). Experiments and field investigations using various environmental scenarios are designed to (1) identify key P removal processes; (2) provide management and operational criteria for basin-scale implementation; and (3) provide scientific data for a standardized comparison of performance among advanced treatment technologies.

  12. Thermal management of high heat flux electronic components in space and aircraft systems, phase 1

    NASA Astrophysics Data System (ADS)

    Iversen, Arthur H.

    1991-03-01

    The objectives of this Phase 1 program were to analyze, design, construct and demonstrate the application of curved surface cooling to power devices with the goal of demonstrating greater than 200 W/sq cm chip dissipation while maintaining junction temperatures within specification. Major components of the experiment comprised the test fixture for mounting the device under test and the cooling loop equipment and instrumentation. The work conducted in this Phase 1 study was to establish the basic parameters for the design of an entire class of efficient, compact, lightweight and cost competitive power conversion/conditioning systems for space, aircraft and general DOD requirements. This has been accomplished. Chip power dissipation of greater than 400 W/sq cm was demonstrated, and a general packaging and the thermal management design has been devised to meet the above requirements. The power limit reached was dictated by the junction temperature and not power dissipation, i.e., critical heat flux. The key to the packaging design is a basic construction concept that provides low junction to fluid thermal resistance. High heat flux dissipation without low thermal resistance is useless because excessive junction temperatures will results.

  13. Implementation of Benchmarking Transportation Logistics Practices and Future Benchmarking Organizations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thrower, A.W.; Patric, J.; Keister, M.

    2008-07-01

    The purpose of the Office of Civilian Radioactive Waste Management's (OCRWM) Logistics Benchmarking Project is to identify established government and industry practices for the safe transportation of hazardous materials which can serve as a yardstick for design and operation of OCRWM's national transportation system for shipping spent nuclear fuel and high-level radioactive waste to the proposed repository at Yucca Mountain, Nevada. The project will present logistics and transportation practices and develop implementation recommendations for adaptation by the national transportation system. This paper will describe the process used to perform the initial benchmarking study, highlight interim findings, and explain how thesemore » findings are being implemented. It will also provide an overview of the next phase of benchmarking studies. The benchmarking effort will remain a high-priority activity throughout the planning and operational phases of the transportation system. The initial phase of the project focused on government transportation programs to identify those practices which are most clearly applicable to OCRWM. These Federal programs have decades of safe transportation experience, strive for excellence in operations, and implement effective stakeholder involvement, all of which parallel OCRWM's transportation mission and vision. The initial benchmarking project focused on four business processes that are critical to OCRWM's mission success, and can be incorporated into OCRWM planning and preparation in the near term. The processes examined were: transportation business model, contract management/out-sourcing, stakeholder relations, and contingency planning. More recently, OCRWM examined logistics operations of AREVA NC's Business Unit Logistics in France. The next phase of benchmarking will focus on integrated domestic and international commercial radioactive logistic operations. The prospective companies represent large scale shippers and have vast experience in safely and efficiently shipping spent nuclear fuel and other radioactive materials. Additional business processes may be examined in this phase. The findings of these benchmarking efforts will help determine the organizational structure and requirements of the national transportation system. (authors)« less

  14. Development of the Andalusian Registry of Patients Receiving Community Case Management, for the follow-up of people with complex chronic diseases.

    PubMed

    Morales-Asencio, Jose M; Kaknani-Uttumchandani, Shakira; Cuevas-Fernández-Gallego, Magdalena; Palacios-Gómez, Leopoldo; Gutiérrez-Sequera, José L; Silvano-Arranz, Agustina; Batres-Sicilia, Juan Pedro; Delgado-Romero, Ascensión; Cejudo-Lopez, Ángela; Trabado-Herrera, Manuel; García-Lara, Esteban L; Martin-Santos, Francisco J; Morilla-Herrera, Juan C

    2015-10-01

    Complex chronic diseases are a challenge for the current configuration of health services. Case management is a service frequently provided for people with chronic conditions, and despite its effectiveness in many outcomes, such as mortality or readmissions, uncertainty remains about the most effective form of team organization, structures and the nature of the interventions. Many processes and outcomes of case management for people with complex chronic conditions cannot be addressed with the information provided by electronic clinical records. Registries are frequently used to deal with this weakness. The aim of this study was to generate a registry-based information system of patients receiving case management to identify their clinical characteristics, their context of care, events identified during their follow-up, interventions developed by case managers and services used. The study was divided into three phases, covering the detection of information needs, the design and its implementation in the health care system, using literature review and expert consensus methods to select variables that would be included in the registry. A total of 102 variables representing structure, processes and outcomes of case management were selected for their inclusion in the registry after the consensus phase. A web-based registry with modular and layered architecture was designed. The framework follows a pattern based on the model-view-controller approach. In its first 6 months after the implementation, 102 case managers have introduced an average number of 6.49 patients each one. The registry permits a complete and in-depth analysis of the characteristics of the patients who receive case management, the interventions delivered and some major outcomes as mortality, readmissions or adverse events. © 2015 John Wiley & Sons, Ltd.

  15. Sundstrand’s Precision Metal Forming Cell. Industrial Modernization Incentive Program (IMIP). Phase 2

    DTIC Science & Technology

    1991-03-01

    1-2 1.4 CONCLUSIONS AND RECOMMENDATIONS ....................... 1-2 20. PHASE II MANAGEMENT PLAN...2-1 2.1 PROGRAM MANAGEMENT ................................... 2-1 2.2 IM IP TEAM...Barbier, reference Section 2.0 (Phase II Management Plan), is complete and this report provides the results of the Phase II study. 1.2 OBJECTIVES The

  16. Usage Analysis for the Identification of Research Trends in Digital Libraries; Keepers of the Crumbling Culture: What Digital Preservation Can Learn from Library History; Patterns of Journal Use by Scientists through Three Evolutionary Phases; Developing a Content Management System-Based Web Site; Exploring Charging Models for Digital Cultural Heritage in Europe; Visions: The Academic Library in 2012.

    ERIC Educational Resources Information Center

    Bollen, Johan; Vemulapalli, Soma Sekara; Xu, Weining; Luce, Rick; Marcum, Deanna; Friedlander, Amy; Tenopir, Carol; Grayson, Matt; Zhang, Yan; Ebuen, Mercy; King, Donald W.; Boyce, Peter; Rogers, Clare; Kirriemuir, John; Tanner, Simon; Deegan, Marilyn; Marcum, James W.

    2003-01-01

    Includes six articles that discuss use analysis and research trends in digital libraries; library history and digital preservation; journal use by scientists; a content management system-based Web site for higher education in the United Kingdom; cost studies for transitioning to digitized collections in European cultural institutions; and the…

  17. Training survey -- educational profile for Hanford HANDI 2000 project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    Fluor Daniel Hanford, Inc. (FDH) is currently adopting streamlined business processes through integrated software solutions. Replacing the legacy software (current/replacement systems, attached) also avoids significant maintenance required to resolve Year 2000 issues. This initiative is being referred to as `HANDI 2000`. The software being implemented in the first phase of this project includes Indus International`s PASSPORT Software, Peoplesoft and Primavera P3 Software. The project, which encompasses all the system replacements that will occur, has been named `HANDI 2000.` The PASSPORT applications being implemented are Inventory Management, Purchasing, Contract Management, Accounts Payable, and MSDS (Material Safety Data Sheets).

  18. Scalable software architecture for on-line multi-camera video processing

    NASA Astrophysics Data System (ADS)

    Camplani, Massimo; Salgado, Luis

    2011-03-01

    In this paper we present a scalable software architecture for on-line multi-camera video processing, that guarantees a good trade off between computational power, scalability and flexibility. The software system is modular and its main blocks are the Processing Units (PUs), and the Central Unit. The Central Unit works as a supervisor of the running PUs and each PU manages the acquisition phase and the processing phase. Furthermore, an approach to easily parallelize the desired processing application has been presented. In this paper, as case study, we apply the proposed software architecture to a multi-camera system in order to efficiently manage multiple 2D object detection modules in a real-time scenario. System performance has been evaluated under different load conditions such as number of cameras and image sizes. The results show that the software architecture scales well with the number of camera and can easily works with different image formats respecting the real time constraints. Moreover, the parallelization approach can be used in order to speed up the processing tasks with a low level of overhead.

  19. External closed-circuit cooling system for management of patients after device implantation: A feasibility study.

    PubMed

    Giofrè, Fabrizio; Ferrari, Paola; Leidi, Cristina; Foschi, Maria Laura; Senni, Michele; De Filippo, Paolo

    2017-08-15

    In the first 24h after pacemaker or implantable cardioverter/defibrillator (ICD) implantation or replacement, the occurrence of hematoma and pain in the surgically treated region is not infrequent and may result in re-intervention and/or more severe complications, such as infections. Currently, the post-implant phase management is very empiric. The aim of this study was to test the clinical applicability and usefulness of an external close-circuit cooling system for the management of the early post-implant period in patients with high risk of hematoma due to anticoagulant and/or antiplatelet therapy. We studied 135 patients (78M; 71±11years) with high risk of hematoma occurrence after pace-maker (63 patients) or ICD (72 patients) implantation or replacement. Immediately after the intervention, a closed-circuit cooling system (CAREPACE™ system, Zamar, Italy) was externally applied on the pre-pectoral region to each patient and maintained for 24h. The system has a compressive pad and a refrigerating circuit in which non-toxic glycolic fluid is pumped. The fluid temperature was set and kept at 5°C for the whole period. The compressive and cooling effect of the system was well tolerated by all the patients at the temperature set. Four patients complained of noise due to machine operation, but in none the treatment was interrupted. The average length of hospital stay was 2.8±0.4days. No clinically significant hematoma was observed at discharge and after one month follow-up visit. This new system can be used for the management of the early phase after device implantation or replacement and appears clinically useful and well tolerated. Further studies on a larger scale are needed to test the potential reduction of post-intervention complications and the cost-effectiveness of this device. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility. Phase 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, J.W.

    1993-08-01

    The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction.

  1. Creating a performance appraisal template for pharmacy technicians using the method of equal-appearing intervals.

    PubMed

    Desselle, Shane P; Vaughan, Melissa; Faria, Thomas

    2002-01-01

    To design a highly quantitative template for the evaluation of community pharmacy technicians' job performance that enables managers to provide sufficient feedback and fairly allocate organizational rewards. Two rounds of interviews with two convenience samples of community pharmacists and pharmacy technicians were conducted. The interview in phase 1 was qualitative, and responses were used to design the second interview protocol. During the phase 2 interviews, a new group of respondents ranked technicians' job responsibilities, identified through the initial interviewees' responses, using scales the researchers had designed using an interval-level scaling technique called equal-appearing intervals. Chain and independent pharmacies. Phase 1-20 pharmacists and 20 technicians from chain and independent pharmacies; phase 2-20 pharmacists and 9 technicians from chain and independent pharmacies. Ratings of the importance of technician practice functions and corresponding responsibilities. Weights were calculated for each practice function. A weighted list of practice functions was developed, and this may serve as a performance evaluation template. Customer service-related activities were judged by pharmacists and technicians alike to be the most important technician functions. Many pharmacies either lack formal performance appraisal systems or fail to implement them properly. Technicians may desire more consistent feedback from pharmacists and value information that may lead to organizational rewards. Using a weighted, behaviorally anchored performance appraisal system may help pharmacists and pharmacy managers meet these demands.

  2. Replacement of Ablators with Phase-Change Material for Thermal Protection of STS Elements

    NASA Technical Reports Server (NTRS)

    Kaul, Raj K.; Stuckey, Irvin; Munafo, Paul M. (Technical Monitor)

    2002-01-01

    As part of the research and development program to develop new Thermal Protection System (TPS) materials for aerospace applications at NASA's Marshall Space Flight Center (MSFC), an experimental study was conducted on a new concept for a non-ablative TPS material. Potential loss of TPS material and ablation by-products from the External Tank (ET) or Solid Rocket Booster (SRB) during Shuttle flight with the related Orbiter tile damage necessitates development of a non-ablative thermal protection system. The new Thermal Management Coating (TMC) consists of phase-change material encapsulated in micro spheres and a two-part resin system to adhere the coating to the structure material. The TMC uses a phase-change material to dissipate the heat produced during supersonic flight rather than an ablative material. This new material absorbs energy as it goes through a phase change during the heating portion of the flight profile and then the energy is slowly released as the phase-change material cools and returns to its solid state inside the micro spheres. The coating was subjected to different test conditions simulating design flight environments at the NASA/MSFC Improved Hot Gas Facility (IHGF) to study its performance.

  3. A Goal Orientation Analysis of Teachers' Motivations to Participate in the School Self-Assessment Processes of a Quality Assurance System in Chile

    ERIC Educational Resources Information Center

    Montecinos, Carmen; Madrid, Romina; Fernández, María Beatriz; Ahumada, Luis

    2014-01-01

    The current study examined the goal orientations that could be inferred from how teachers from six municipal schools in Chile described their understandings, emotions, and behaviors during their participation in the assessment phase of the School Management Quality Assurance System. Content analysis of focus group interview transcripts evidenced…

  4. A REMOTE SENSING AND GIS-ENABLED HIGHWAY ASSET MANAGEMENT SYSTEM PHASE 2

    DOT National Transportation Integrated Search

    2018-02-02

    The objective of this project is to validate the use of commercial remote sensing and spatial information (CRS&SI) technologies, including emerging 3D line laser imaging technology, mobile light detection and ranging (LiDAR), image processing algorit...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    G.I. Alekseev

    Wastewater generation, water consumption, and water management at coke plants are considered. Measures to create runoff-free water-supply and sewer systems are discussed. Filters for water purification, corrosion inhibitors, and biocides are described. An integrated single-phase technology for the removal of phenols, thiocyanides, and ammoniacal nitrogen is outlined.

  6. 75 FR 22675 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... expansion. Security screening expansion. Terminal restroom design. Terminal restroom remodel. Terminal... remodeling. Pavement management system. Master plan, phase 1. Decision Date: September 23, 2009. FOR FURTHER... modifications, passenger terminal. Rehabilitation of taxilane K-1. Design and implement noise mitigation...

  7. Development of Uniform Sections for PMS Inventory and Application.

    DOT National Transportation Integrated Search

    2007-12-01

    This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. : The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system : (PMS). Results...

  8. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    DOT National Transportation Integrated Search

    1998-11-01

    The purpose of this working paper is to present estimates of potential safety benefits resulting from full implementation of Intelligent Transportation Systems (ITS) in the United States. These estimates were derived by integrating results from a num...

  9. Commercial vehicle fleet management and information systems. Phase 1 : interim report

    DOT National Transportation Integrated Search

    1998-01-01

    The three-quarter moving composite price index is the weighted average of the indices for three consecutive quarters. The Composite Bid Price Index is composed of six indicator items: common excavation, to indicate the price trend for all roadway exc...

  10. Implementation of Indigenous Electronic Medical Record System to Facilitate Care of Sickle Cell Disease Patients in Chhattisgarh.

    PubMed

    Choubey, Mona; Mishra, Hrishikesh; Soni, Khushboo; Patra, Pradeep Kumar

    2016-02-01

    Sickle cell disease (SCD) is prevalent in central India including Chhattisgarh. Screening for SCD is being carried out by Government of Chhattisgarh. Electronic Medical Record (EMR) system was developed and implemented in two phases. Aim was to use informatics techniques and indigenously develop EMR system to improve the care of SCD patients in Chhattisgarh. EMR systems had to be developed to store and manage: i) huge data generated through state wide screening for SCD; ii) clinical data for SCD patients attending the outpatient department (OPD) of institute. 'State Wide Screening Data Interface' (SWSDI) was designed and implemented for storing and managing data generated through screening program. Further, 'Sickle Cell Patients Temporal Data Management System' (SCPTDMS) was developed and implemented for storing, managing and analysing sickle cell disease patients' data at OPD. Both systems were developed using VB.Net and MS SQL Server 2012. Till April 2015, SWSDI has data of 1294558 persons, out of which 121819 and 4087 persons are carriers and patients of sickle cell disease respectively. Similarly till June 2015, SCPTDMS has data of 3760 persons, of which 923 are sickle cell disease patients (SS) and 1355 are sickle cell carriers (AS). Both systems are proving to be useful in efficient storage, management and analysis of data for clinical and research purposes. The systems are an example of beneficial usage of medical informatics solutions for managing large data at community level.

  11. Study of Tools for Command and Telemetry Dictionaries

    NASA Technical Reports Server (NTRS)

    Pires, Craig; Knudson, Matthew D.

    2017-01-01

    The Command and Telemetry Dictionary is at the heart of space missions. The C&T Dictionary represents all of the information that is exchanged between the various systems both in space and on the ground. Large amounts of ever-changing information has to be disseminated to all for the various systems and sub-systems throughout all phases of the mission. The typical approach of having each sub-system manage it's own information flow, results in a patchwork of methods within a mission. This leads to significant duplication of effort and potential errors. More centralized methods have been developed to manage this data flow. This presentation will compare two tools that have been developed for this purpose, CCDD and SCIMI that were designed to work with the Core Flight System (cFS).

  12. Climate Risk Management Strategy in the Tropical Low to Medium Income Countries

    NASA Astrophysics Data System (ADS)

    Parhi, P.; Giannini, A.; Lall, U.

    2015-12-01

    The market penetration of index insurance sector, posed as an innovative weather risk management and climate change adaptation tool, is growing in the tropical low to medium income countries. Usually the underwriters such as regional, national or international organizations, banks or (re)insurance companies hold these risk portfolios. The micro-level insurance contracts when aggregated at state, country or regional level, could potentially pose significant systemic risk due to tail dependency, micro-correlation and fat-tail nature of the damage, threatening the survival of this micro-financial risk management sector, ultimately impeding the sustainable development goals. Analyzing the observed inter-annual variability of the tropical climate system, this paper identifies the physical mechanisms for heterogeneous climatic response and suggests that diversification opportunity exists across different regions and seasons. Taking two case studies from tropical Africa, an empirical analysis is done to highlight that El Niño modulates the number of wet days in an opposite way across the two regions and seasons, suggesting the possibility of diversification of the index insurance portfolios across regions and seasons. Specifically, El Niño is associated with drier condition over Sahel, while it is associated with wetter condition over Tropical Eastern Africa (TEA), during their respective Jul-Aug-Sep and Oct-Nov-Dec rainy seasons. Such contrasting modulation in the number of wet days can be understood by the phase relationship between the local rainy season and El Niño evolution stage. The transient phase of El Niño, which is in phase with the rainy season (Jul-Sep) over Sahel, is characterized by tropospheric stability induced by tropospheric warming without regional North Atlantic sea surface temperature (SST) adjustment. In contrast, the mature phase of El Niño is in phase with the short rainy season (Oct-Dec) over TEA, and is characterized by adjusted warmer regional Indian Ocean SST and increased onshore- advection of moisture from the Indian Ocean.

  13. Marshall Application Realignment System (MARS) Architecture

    NASA Technical Reports Server (NTRS)

    Belshe, Andrea; Sutton, Mandy

    2010-01-01

    The Marshall Application Realignment System (MARS) Architecture project was established to meet the certification requirements of the Department of Defense Architecture Framework (DoDAF) V2.0 Federal Enterprise Architecture Certification (FEAC) Institute program and to provide added value to the Marshall Space Flight Center (MSFC) Application Portfolio Management process. The MARS Architecture aims to: (1) address the NASA MSFC Chief Information Officer (CIO) strategic initiative to improve Application Portfolio Management (APM) by optimizing investments and improving portfolio performance, and (2) develop a decision-aiding capability by which applications registered within the MSFC application portfolio can be analyzed and considered for retirement or decommission. The MARS Architecture describes a to-be target capability that supports application portfolio analysis against scoring measures (based on value) and overall portfolio performance objectives (based on enterprise needs and policies). This scoring and decision-aiding capability supports the process by which MSFC application investments are realigned or retired from the application portfolio. The MARS Architecture is a multi-phase effort to: (1) conduct strategic architecture planning and knowledge development based on the DoDAF V2.0 six-step methodology, (2) describe one architecture through multiple viewpoints, (3) conduct portfolio analyses based on a defined operational concept, and (4) enable a new capability to support the MSFC enterprise IT management mission, vision, and goals. This report documents Phase 1 (Strategy and Design), which includes discovery, planning, and development of initial architecture viewpoints. Phase 2 will move forward the process of building the architecture, widening the scope to include application realignment (in addition to application retirement), and validating the underlying architecture logic before moving into Phase 3. The MARS Architecture key stakeholders are most interested in Phase 3 because this is where the data analysis, scoring, and recommendation capability is realized. Stakeholders want to see the benefits derived from reducing the steady-state application base and identify opportunities for portfolio performance improvement and application realignment.

  14. Facing Stormwater Management Challenges at a Southeastern Army Installation: US Army Garrison Fort Gordon

    DTIC Science & Technology

    2012-05-24

    Medical Center • Host to Army, Navy, Air Force, Marines and multi- national forces • Supporting 17,950 military and 6,710 civilians 4 Fort Gordon...comply with the NPne:s ( National Pol utant Discharge Elimination System) Phase II stormwater oermit and reduce pollutants fourld in stonnwatar...Lane Avenue: • Approximately 50 ft drop • Stormwater management (constructed riffle ) • Streambank stabilization (geolift, log vane) 19

  15. Benchmark requirements for the the Energy Emergency Management Information System (EEMIS). Phase 1: Work plan

    NASA Astrophysics Data System (ADS)

    1980-09-01

    The energy emergency management information system (EEMIS) has responsibility for providing special information and communication services to government officials at Federal and state levels, who must deal with energy emergencies. Because of proprietary information residing in the data base used for federal purposes, a special system (EEMIS-S) must be established for use by the states. It is planned to acquire teleprocessing services for EEMIS-S from a time-sharing commercial vendor, and the process for procurement must meet guidelines for approval. The work plan and schedule for meeting these guidelines are discussed. Tasks to be included contain estimates of time, cost, and resources required, all of which are briefly described.

  16. A dynamic two-dimensional system for measuring volatile organic compound volatilization and movement in soils.

    PubMed

    Allaire, S E; Yates, S R; Ernst, F F; Gan, J

    2002-01-01

    There is an important need to develop instrumentation that allows better understanding of atmospheric emission of toxic volatile compounds associated with soil management. For this purpose, chemical movement and distribution in the soil profile should be simultaneously monitored with its volatilization. A two-dimensional rectangular soil column was constructed and a dynamic sequential volatilization flux chamber was attached to the top of the column. The flux chamber was connected through a manifold valve to a gas chromatograph (GC) for real-time concentration measurement. Gas distribution in the soil profile was sampled with gas-tight syringes at selected times and analyzed with a GC. A pressure transducer was connected to a scanivalve to automatically measure the pressure distribution in the gas phase of the soil profile. The system application was demonstrated by packing the column with a sandy loam in a symmetrical bed-furrow system. A 5-h furrow irrigation was started 24 h after the injection of a soil fumigant, propargyl bromide (3-bromo-1-propyne; 3BP). The experience showed the importance of measuring lateral volatilization variability, pressure distribution in the gas phase, chemical distribution between the different phases (liquid, gas, and sorbed), and the effect of irrigation on the volatilization. Gas movement, volatilization, water infiltration, and distribution of degradation product (Br-) were symmetric around the bed within 10%. The system saves labor cost and time. This versatile system can be modified and used to compare management practices, estimate concentration-time indexes for pest control, study chemical movement, degradation, and emissions, and test mathematical models.

  17. Managing high-risk patients: the Mass General care management programme

    PubMed Central

    Kodner, Dennis L.

    2015-01-01

    The Massachusetts General Care Management Program (Mass General CMP or CMP) was designed as a federally supported demonstration to test the impact of intensive, practice-based care management on high-cost Medicare fee-for-service (FFS) beneficiaries—primarily older persons—with multiple hospitalisations and multiple chronic conditions. The Massachusetts General Care Management Program operated over a 6-year period in two phases (3 years each). It started during the first phase at Massachusetts General Hospital, a major academic medical centre in Boston, Massachusetts in collaboration with Massachusetts General Physicians Organisation. During the second phase, the programme expanded to two more affiliated sites in and around the Boston area, including a community hospital, as well as incorporated several modifications primarily focused on the management of transitions to post-acute care in skilled nursing facilities. At the close of the demonstration in July 2012, Mass General Massachusetts General Care Management Program became a component of a new Pioneer accountable care organisation (ACO). The Massachusetts General Care Management Program is focused on individuals meeting defined eligibility criteria who are offered care that is integrated by a case manager embedded in a primary care practice. The demonstration project showed substantial cost savings compared to fee-for-service patients served in the traditional Medicare system but no impact on hospital readmissions. The Massachusetts General Care Management Program does not rest upon a “whole systems” approach to integrated care. It is an excellent example of how an innovative care co-ordination programme can be implemented in an existing health-care organisation without making fundamental changes in its underlying structure or the way in which direct patient care services are paid for. The accountable care organisation version of the Massachusetts General Care Management Program includes the staffing structure, standards of practice, collaborative approach to care transitions and information technology tools that were used in the original demonstration project. PMID:26417211

  18. KSC-2013-2916

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. - NASA's Commercial Crew Program Manager Ed Mango and astronaut Mike Good media on the progress of American human spaceflight development at Kennedy Space Center in Florida. At right is NASA Public Affairs Officer Gregory Harland. They also discussed the future steps the program will take to certify crew transportation systems for missions to the International Space Station. The program is working toward the next phase of certification, which will be called Commercial Crew Transportation Capability, or CCtCap. That phase will include a joint test concept in which NASA astronauts will play a role in flight testing the systems. To learn more about CCP, visit www.nasa.gov/commercialcrew. Photo credit: Jim Grossmann

  19. KSC-2013-2914

    NASA Image and Video Library

    2013-06-27

    CAPE CANAVERAL, Fla. - NASA's Commercial Crew Program Manager Ed Mango and astronaut Mike Good media on the progress of American human spaceflight development at Kennedy Space Center in Florida. At right is NASA Public Affairs Officer Gregory Harland. They also discussed the future steps the program will take to certify crew transportation systems for missions to the International Space Station. The program is working toward the next phase of certification, which will be called Commercial Crew Transportation Capability, or CCtCap. That phase will include a joint test concept in which NASA astronauts will play a role in flight testing the systems. To learn more about CCP, visit www.nasa.gov/commercialcrew. Photo credit: Jim Grossmann

  20. Tracking and data system support for the Viking 1975 mission to Mars. Volume 2: Launch through landing of Viking 1

    NASA Technical Reports Server (NTRS)

    Mudgway, D. J.; Traxler, M. R.

    1977-01-01

    Problems inherent in the deployment and management of a worldwide tracking and data acquisition network to support the two Viking Orbiters and two Viking Landers simultaneously over 320 million kilometers (200 million miles) of deep space are discussed. Activities described include tracking coverage of the launch phase, the deep space operations during the long cruise phase that occupied approximately 11 months, and the implementation of the a vast worldwide network of tracking sttions and global communications systems. The performance of the personnel, hardware, and software involved in this vast undertaking are evaluated.

  1. Agricultural land use and N losses to water: the case study of a fluvial park in northern Italy.

    PubMed

    Morari, F; Lugato, E; Borin, M

    2003-01-01

    An integrated water resource management programme has been under way since 1999 to reduce agricultural water pollution in the River Mincio fluvial park. The experimental part of the programme consisted of: a) a monitoring phase to evaluate the impact of conventional and environmentally sound techniques (Best Management Practices, BMPs) on water quality; this was done on four representative landscape units, where twelve fields were instrumented to monitor the soil, surface and subsurface water quality; b) a modelling phase to extend the results obtained at field scale to the whole territory of the Mincio watershed. For this purpose a GIS developed in the Arc/Info environment was integrated into the CropSyst model. The model had previously been calibrated to test its ability to describe the complexity of the agricultural systems. The first results showed a variable efficiency of the BMPs depending on the interaction between management and pedo-climatic conditions. In general though, the BMPs had positive effects in improving the surface and subsurface water quality. The CropSyst model was able to describe the agricultural systems monitored and its linking with the GIS represented a valuable tool for identifying the vulnerable areas within the watershed.

  2. Passive thermal management using phase change materials

    NASA Astrophysics Data System (ADS)

    Ganatra, Yash Yogesh

    The trend of enhanced functionality and reducing thickness of mobile devices has. led to a rapid increase in power density and a potential thermal bottleneck since. thermal limits of components remain unchanged. Active cooling mechanisms are not. feasible due to size, weight and cost constraints. This work explores the feasibility. of a passive cooling system based on Phase Change Materials (PCMs) for thermal. management of mobile devices. PCMs stabilize temperatures due to the latent heat. of phase change thus increasing the operating time of the device before threshold. temperatures are exceeded. The primary contribution of this work is the identification. of key parameters which influence the design of a PCM based thermal management. system from both the experiments and the numerical models. This work first identifies strategies for integrating PCMs in an electronic device. A. detailed review of past research, including experimental techniques and computational. models, yields key material properties and metrics to evaluate the performance of. PCMs. Subsequently, a miniaturized version of a conventional thermal conductivity. measurement technique is developed to characterize thermal resistance of PCMs. Further, latent heat and transition temperatures are also characterized for a wide. range of PCMs. In-situ measurements with PCMs placed on the processor indicate that some. PCMs can extend the operating time of the device by as much as a factor of 2.48. relative to baseline tests (with no PCMs). This increase in operating time is investigated. by computational thermal models that explore various integration locations, both at the package and device level.

  3. Thermal modeling of secondary lithium batteries for electric vehicle/hybrid electric vehicle applications

    NASA Astrophysics Data System (ADS)

    Al-Hallaj, Said; Selman, J. R.

    A major obstacle to the development of commercially successful electric vehicles (EV) or hybrid electric vehicles (HEV) is the lack of a suitably sized battery. Lithium ion batteries are viewed as the solution if only they could be "scaled-up safely", i.e. if thermal management problems could be overcome so the batteries could be designed and manufactured in much larger sizes than the commercially available near-2-Ah cells. Here, we review a novel thermal management system using phase-change material (PCM). A prototype of this PCM-based system is presently being manufactured. A PCM-based system has never been tested before with lithium-ion (Li-ion) batteries and battery packs, although its mode of operation is exceptionally well suited for the cell chemistry of the most common commercially available Li-ion batteries. The thermal management system described here is intended specifically for EV/HEV applications. It has a high potential for providing effective thermal management without introducing moving components. Thereby, the performance of EV/HEV batteries may be improved without complicating the system design and incurring major additional cost, as is the case with "active" cooling systems requiring air or liquid circulation.

  4. Risk management in waste water treatment.

    PubMed

    Wagner, M; Strube, I

    2005-01-01

    With the continuous restructuring of the water market due to liberalisation, privatisation and internationalisation processes, the requirements on waste water disposal companies have grown. Increasing competition requires a target-oriented and clearly structured procedure. At the same time it is necessary to meet the environment-relevant legal requirements and to design the processes to be environment-oriented. The implementation of risk management and the integration of such a management instrument in an existing system in addition to the use of modern technologies and procedures can help to make the operation of the waste water treatment safer and consequently strengthen market position. The risk management process consists of three phases, risk identification, risk analysis/risk assessment and risk handling, which are based on each other, as well as of the risk managing. To achieve an identification of the risks as complete as possible, a subdivision of the kind of risks (e.g. legal, financial, market, operational) is suggested. One possibility to assess risks is the portfolio method which offers clear representation. It allows a division of the risks into classes showing which areas need handling. The determination of the appropriate measures to handle a risk (e.g. avoidance, reduction, shift) is included in the concluding third phase. Different strategies can be applied here. On the one hand, the cause-oriented strategy, aiming at preventive measures which aim to reduce the probability of occurrence of a risk (e.g. creation of redundancy, systems with low susceptibility to malfunction). On the other hand, the effect-oriented strategy, aiming to minimise the level of damage in case of an undesired occurrence (e.g. use of alarm systems, insurance cover).

  5. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 5: Design of the IPAD system. Part 2: System design. Part 3: General purpose utilities, phase 1, task 2

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.

    1973-01-01

    Viable designs are presented of various elements of the IPAD framework software, data base management system, and required new languages in relation to the capabilities of operating systems software. A thorough evaluation was made of the basic systems functions to be provide by each software element, its requirements defined in the conceptual design, the operating systems features affecting its design, and the engineering/design functions which it was intended to enhance.

  6. Proposal of experimental setup on boiling two-phase flow on-orbit experiments onboard Japanese experiment module "KIBO"

    NASA Astrophysics Data System (ADS)

    Baba, S.; Sakai, T.; Sawada, K.; Kubota, C.; Wada, Y.; Shinmoto, Y.; Ohta, H.; Asano, H.; Kawanami, O.; Suzuki, K.; Imai, R.; Kawasaki, H.; Fujii, K.; Takayanagi, M.; Yoda, S.

    2011-12-01

    Boiling is one of the efficient modes of heat transfer due to phase change, and is regarded as promising means to be applied for the thermal management systems handling a large amount of waste heat under high heat flux. However, gravity effects on the two-phase flow phenomena and corresponding heat transfer characteristics have not been clarified in detail. The experiments onboard Japanese Experiment Module "KIBO" in International Space Station on boiling two-phase flow under microgravity conditions are proposed to clarify both of heat transfer and flow characteristics under microgravity conditions. To verify the feasibility of ISS experiments on boiling two-phase flow, the Bread Board Model is assembled and its performance and the function of components installed in a test loop are examined.

  7. Posttest calculations of bundle quench test CORA-13 with ATHLET-CD

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bestele, J.; Trambauer, K.; Schubert, J.D.

    Gesellschaft fuer Anlagen- und Reaktorsicherheit is developing, in cooperation with the Institut fuer Kernenergetik und Energiesysteme, Stuttgart, the system code Analysis of Thermalhydraulics of Leaks and Transients with Core Degradation (ATHLET-CD). The code consists of detailed models of the thermal hydraulics of the reactor coolant system. This thermo-fluid dynamics module is coupled with modules describing the early phase of the core degradation, like cladding deformation, oxidation and melt relocation, and the release and transport of fission products. The assessment of the code is being done by the analysis of separate effect tests, integral tests, and plant events. The code willmore » be applied to the verification of severe accident management procedures. The out-of-pile test CORA-13 was conducted by Forschungszentrum Karlsruhe in their CORA test facility. The test consisted of two phases, a heatup phase and a quench phase. At the beginning of the quench phase, a sharp peak in the hydrogen generation rate was observed. Both phases of the test have been calculated with the system code ATHLET-CD. Special efforts have been made to simulate the heat losses and the flow distribution in the test facility and the thermal hydraulics during the quench phase. In addition to previous calculations, the material relocation and the quench phase have been modeled. The temperature increase during the heatup phase, the starting time of the temperature escalation, and the maximum temperatures have been calculated correctly. At the beginning of the quench phase, an increased hydrogen generation rate has been calculated as measured in the experiment.« less

  8. Coordination of short-term and long-term mitigation measures of hydro-meteorological risks: the importance of establishing a link between emergency management and spatial planning

    NASA Astrophysics Data System (ADS)

    Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa

    2013-04-01

    The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored by means of exploratory questionnaires and interviews with government agencies, local administrations, community and research organizations on each study site. First results provided will address the general role of spatial planning in risk management. Additionally, preliminary observations are made in regard to the coordination of emergency preparedness and long-term spatial planning activities. The observations consider that integration facilitates proactive strategies that aim at preventing disaster occurrence and promote interaction between involved parties. Finally, consideration is given to the potential use of a DSS tool to cover both aspects of spatial planning and emergency management in the risk management cycle.

  9. Analysis and Development of Management Information Systems for Private Messes Afloat

    DTIC Science & Technology

    1988-03-01

    the development phase emphasis was placed on a three step approach starting with an analysis of the requirements as established by... oper - ating the mess divided by number of mess members Total Mess Bill Due Total of old bills, current bill, mess share owed, and special assessment 46...TRANSPARENCY THE SYSTEM BEHAVIOR IS TRANSPARENT TO THE USER. THAT MEANS THAT THE USER CAN DEVELOP A CONSISTENT MODEL OF THE SYSTEM WHEN WORKING

  10. Space station System Engineering and Integration (SE and I). Volume 2: Study results

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A summary of significant study results that are products of the Phase B conceptual design task are contained. Major elements are addressed. Study results applicable to each major element or area of design are summarized and included where appropriate. Areas addressed include: system engineering and integration; customer accommodations; test and program verification; product assurance; conceptual design; operations and planning; technical and management information system (TMIS); and advanced development.

  11. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  12. Space station electric power system requirements and design

    NASA Technical Reports Server (NTRS)

    Teren, Fred

    1987-01-01

    An overview of the conceptual definition and design of the space station Electric Power System (EPS) is given. Responsibilities for the design and development of the EPS are defined. The EPS requirements are listed and discussed, including average and peak power requirements, contingency requirements, and fault tolerance. The most significant Phase B trade study results are summarized, and the design selections and rationale are given. Finally, the power management and distribution system architecture is presented.

  13. IS-ENES project management - lessons learnt

    NASA Astrophysics Data System (ADS)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  14. USDOT guidance summary for connected vehicle deployments : concept of operations and the CVRIA/SET-IT tool.

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to the Concept of Operations for the CV Pilots DeploymentConcept Development Phase. Methods for system engineering are discussed in depth with definitions for thesuccessful management of each aspect...

  15. California ATMS Testbed : PHASE III: Operational Research Implementation : Final Report [Volume 1: Executive Summary ; and, Volume II: Technical Report

    DOT National Transportation Integrated Search

    2006-10-01

    This report summarizes research and development that has been conducted to position the Testbed to support prototype deployment and evaluation of Advanced Transportation Management Systems (ATMS) products and services. The various elements contained ...

  16. An Analysis of the Maintenance Performance Measurement System for LAMPS MK III Helicopter Squadrons

    DTIC Science & Technology

    1993-12-01

    effectiveness, efficiency, productivity, quality, budgetability, innovation and quality of work.life ), and determine the significance of AFM funds on... Balance .. Phase II - Unit Sustainment Manpower Cost Methodology, Management Consulting and Research, Falls Church, Virginia, 1981. McCutcheon, David A

  17. Integrated corridor management initiative : demonstration phase evaluation, Dallas benefit-cost analysis test plan.

    DOT National Transportation Integrated Search

    2000-12-01

    The focus of this paper is on advanced public transportation systems (APTS) technologies. It assesses the extent of their deployment and judges their degree of success. It covers APTS technologies in use only by bus and demand responsive service oper...

  18. Phase 2 - GASB Statement 34 compliance : development of a fixed asset (infrastructure) for the Alabama Department of Transportation

    DOT National Transportation Integrated Search

    2003-05-01

    The Alabama Department of Transportation (ALDOT) Bureau of Materials and Tests has been working with the University of Alabama's Management Information Systems Department to provide a tool for road maintenance and optimization associated funding. Spe...

  19. Development and validation of deterioration models for concrete bridge decks - phase 1 : artificial intelligence models and bridge management system.

    DOT National Transportation Integrated Search

    2013-06-01

    This research documents the development and evaluation of artificial neural network (ANN) models to predict the condition ratings of concrete highway bridge decks in Michigan. Historical condition assessments chronicled in the national bridge invento...

  20. Design Of An ITS-Level Advanced Traffic Management System, A Human Factors Perspective

    DOT National Transportation Integrated Search

    1999-09-01

    The incidence of motorists violating the red phase of a traffic signal has been on the rise and is a contributing factor to intersection crashes. Technology has become available that automatically detects a motorist running the red light and records ...