Sample records for management system program

  1. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Program Design and Management § 632.76 Program management systems. (a) All Native American grantees shall establish management information systems to... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program management systems. 632.76 Section...

  2. 75 FR 41798 - Solicitation of Letters of Interest to Participate in Biotechnology Quality Management System...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ...] Solicitation of Letters of Interest to Participate in Biotechnology Quality Management System Program AGENCY... participate in the APHIS Biotechnology Quality Management System Program. The Biotechnology Quality Management..., audit-based compliance assistance program known as the Biotechnology Quality Management System Program...

  3. 20 CFR 632.76 - Program management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program management systems. 632.76 Section... management systems. (a) All Native American grantees shall establish management information systems to... for the overall management of all programs including: (1) Eligibility verification systems as...

  4. 75 FR 68418 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-08

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION...) to establish a Real-Time System Management Information Program that provides, in all States, the... traveler information. The purposes of the Real-Time System Management Information Program are to: (1...

  5. 76 FR 42536 - Real-Time System Management Information Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...-Time System Management Information Program AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... Real-Time System Management Information Program and general information about current and planned... establishing requirements for the Real-Time System Management Information Program on November 8, 2010, at 75 FR...

  6. 32 CFR 239.10 - Management Controls.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management in formation system to protect the privacy information of Expanded...

  7. 32 CFR 239.10 - Management controls.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management information system to protect the privacy of Expanded HAP...

  8. 32 CFR 239.10 - Management controls.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management information system to protect the privacy of Expanded HAP...

  9. 32 CFR 239.10 - Management controls.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... systems. Headquarters, USACE has an existing information management system that manages all information related to the HAP program. (1) HAPMIS. The Homeowners Assistance Program Management Information System... to this program and the management information system to protect the privacy of Expanded HAP...

  10. 20 CFR 633.311 - Management information systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  11. 20 CFR 633.311 - Management information systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  12. 20 CFR 633.311 - Management information systems.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Management information systems. 633.311... AND SEASONAL FARMWORKER PROGRAMS Program Design and Administrative Procedures § 633.311 Management information systems. All grantees shall establish and maintain a program and financial management system which...

  13. The Air Program Information Management System (APIMS)

    DTIC Science & Technology

    2011-11-02

    Technology November 2, 2011 The Air Program Information Management System (APIMS) Frank Castaneda, III, P.E. APIMS Program Manager AFCEE/TDNQ APIMS...NOV 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE The Air Program Information Management System (APIMS... Information   Management   System : Sustainability of  Enterprise air quality management system • Aspects and Impacts to Process • Auditing and Measurement

  14. 23 CFR 511.305 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information Program § 511.305 Policy. This part establishes the provisions and parameters for the Real-Time System Management Information Program for State DOTs...

  15. 23 CFR 511.305 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information Program § 511.305 Policy. This part establishes the provisions and parameters for the Real-Time System Management Information Program for State DOTs...

  16. 23 CFR 511.305 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information Program § 511.305 Policy. This part establishes the provisions and parameters for the Real-Time System Management Information Program for State DOTs...

  17. 23 CFR 511.305 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information Program § 511.305 Policy. This part establishes the provisions and parameters for the Real-Time System Management Information Program for State DOTs...

  18. 45 CFR 1304.51 - Management systems and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... control program quality, maintain program accountability, and advise governing bodies, policy groups, and... DELEGATE AGENCIES Program Design and Management § 1304.51 Management systems and procedures. (a) Program... program planning that includes consultation with the program's governing body, policy groups, and program...

  19. Department of Defense Healthcare Management System Modernization (DHMSM)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Department of Defense Healthcare Management System Modernization (DHMSM) Defense...DSN Fax: Date Assigned: November 16, 2015 Program Information Program Name Department of Defense Healthcare Management System Modernization...DHMSM) DoD Component DoD The acquiring DoD Component is Program Executive Office (PEO) Department of Defense (DoD) Healthcare Management Systems (DHMS

  20. 48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...

  1. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  2. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  3. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  4. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  5. 25 CFR 170.502 - Are management systems required for the IRR Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... the following systems for the IRR Program: (1) Pavement management; (2) Safety management; (3) Bridge...

  6. Children/Youth Physical Fitness Program Management System.

    ERIC Educational Resources Information Center

    Mozzini, Lou; And Others

    Intended for physical fitness program managers, this book presents a system through which these professionals can justify, evaluate, develop, supervise, and promote a sound physical fitness program. Sections address the management stages of: (1) program assessment; (2) program commitment; (3) physical fitness program planning; (4) program…

  7. Navy Occupational Health Information Management System (NOHIMS). System-Wide Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOHIMS SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL JUNE 1987 DTIC 00 SEP I 21988DJ 0) 4... INFORMATION MANAGEMENT SYSTEM (NOHIMS) N 1.98 SYSTEM-WIDE MODULE PROGRAM MAINTENANCE MANUAL 7. Author(s) a. Performing Organization Rapt. No. MITRE... Management System (NOHIMS). NORIMS, whose initial version was ,eveloped at the Naval Health Research Center (NHRC), is a composite of 4 -’o subsystems: an

  8. 75 FR 61413 - Notice of Availability of Biotechnology Quality Management System Audit Standard and Evaluation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ...] Notice of Availability of Biotechnology Quality Management System Audit Standard and Evaluation of... Biotechnology Quality Management System Program (BQMS Program) to assist regulated entities in achieving and... customized biotechnology quality management system (BQMS) to improve their management of domestic research...

  9. Implementation of the Air Program Information Management System (APIMS) Inspection Module

    DTIC Science & Technology

    2009-05-01

    7 5 T H A I R B A S E W I N G Implementation of the Air Program Information Management System (APIMS) Inspection Module 2009 Environment...Implementation of the Air Program Information Management System (APIMS) Inspection Module 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER

  10. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  11. Apollo/Skylab suit program-management systems study, volume 1

    NASA Technical Reports Server (NTRS)

    Mcniff, M.

    1974-01-01

    A management systems study for future spacesuit programs was conducted to assess past suit program requirements and management systems in addition to new and modified systems in order to identify the most cost effective methods for use during future spacesuit programs. The effort and its findings concerned the development and production of all hardware ranging from crew protective gear to total launch vehicles.

  12. The analysis of the program to develop the Nuclear Waste Management System: Allocated requirements for the Office of Civilian Radioactive Waste Management Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woods, T.W.

    1991-09-01

    This report is volume 3, part B, of the program to satisfy the allocated requirements of the Office of Civilian Radioactive Waste Management Program, in the development of the nuclear waste management system. The report is divided into the following sections: regulatory compliance; external relations; international programs; strategic and contingency planning; contract business management; and administrative services. (CS)

  13. Navy Occupational Health Information Management System (NOHIMS). Medical Exam Scheduling Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center

  14. 76 FR 65561 - Multistate Corridor Operations and Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-21

    ... participation in the Multistate Corridor Operations and Management (MCOM) Program authorized by the Safe... transportation system management and operations. This notice seeks applications for available fiscal year (FY... system management and operations. Since the MCOM program is funded by the DOT Intelligent Transportation...

  15. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROOT, R.W.

    1999-05-18

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems.

  16. 23 CFR 511.311 - Real-time information program establishment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information... operated by the State. In addition, the real-time information program shall complement current... 23 Highways 1 2011-04-01 2011-04-01 false Real-time information program establishment. 511.311...

  17. 23 CFR 511.311 - Real-time information program establishment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information... operated by the State. In addition, the real-time information program shall complement current... 23 Highways 1 2014-04-01 2014-04-01 false Real-time information program establishment. 511.311...

  18. 23 CFR 511.311 - Real-time information program establishment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information... operated by the State. In addition, the real-time information program shall complement current... 23 Highways 1 2013-04-01 2013-04-01 false Real-time information program establishment. 511.311...

  19. 23 CFR 511.311 - Real-time information program establishment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... INFRASTRUCTURE MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information... operated by the State. In addition, the real-time information program shall complement current... 23 Highways 1 2012-04-01 2012-04-01 false Real-time information program establishment. 511.311...

  20. 23 CFR 511.307 - Eligibility for Federal funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the development and implementation of a real-time information program. (b) Those project applications... applications to establish a real-time information program for non-Interstate highways are entitled to a Federal... MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information Program...

  1. Program Manager: Journal of the Defense Systems Management College, Volume 21, Number 3, May-June 1992

    DTIC Science & Technology

    1992-05-01

    one manager -to-player inter- coaching styles are being used in tions do best with structured and actions, which diminish as each these outside...May-june 1992’ MANAGER Journal of the Defense Systems Management College Program management ,teI hIN be pl~ vrb~c aeese and sole; its 92-19864 92 7...23 l 9~3 PROGRAM MANAGER Journal of the Defense Systems Management College Vol. XXI, No. 3, DSMC 108 2 8 Is There Going to Be a High- Rebuilding the

  2. Joint Exercise Program: DOD Needs to Take Steps to Improve the Quality of Funding Data

    DTIC Science & Technology

    2017-02-01

    technology systems—the Joint Training Information Management System (JTIMS) and the Execution Management System—to manage the execution of the Joint...Exercise Program, but does not have assurance that funding execution data in the Execution Management System are reliable. JTIMS is the system of record...for the Joint Exercise Program that combatant commanders use to plan and manage their joint training exercises. GAO observed significant variation

  3. Utilization of Information Provided by the Wisconsin Management System.

    ERIC Educational Resources Information Center

    Rossmiller, Richard A.

    The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…

  4. Underground storage tank management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective actionmore » is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.« less

  5. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  6. General RMP Guidance - Chapter 5: Management System

    EPA Pesticide Factsheets

    If you have at least one Program 2 or Program 3 process, you are required to develop a management system to oversee the implementation of the risk management program elements, and designate responsibility for making process safety a constant priority.

  7. Joint Operational Medicine Information Systems (JOMIS)

    DTIC Science & Technology

    2016-03-01

    Component is Program Executive Office (PEO) Department of Defense (DoD) Healthcare Management Systems (DHMS) for Defense Health Agency (DHA). Responsible...AT&L)) and the Program Executive Office (PEO) Defense Healthcare Management Systems (DHMS). ​Operational medicine is the application of routine and...acquired by the DoD Healthcare Management System Modernization (DHMSM) program for Health Care Delivery (HCD) capabilities. JOMIS future release(s

  8. Army Contract Writing System (ACWS)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS...UNCLASSIFIED 4 Program Description The Army Contract Writing System (ACWS) will be the Army’s single, next-generation, enterprise-wide contract writing

  9. Program Helps Standardize Documentation Of Software

    NASA Technical Reports Server (NTRS)

    Howe, G.

    1994-01-01

    Intelligent Documentation Management System, IDMS, computer program developed to assist project managers in implementing information system documentation standard known as NASA-STD-2100-91, NASA STD, COS-10300, of NASA's Software Management and Assurance Program. Standard consists of data-item descriptions or templates, each of which governs particular component of software documentation. IDMS helps program manager in tailoring documentation standard to project. Written in C language.

  10. 48 CFR 301.607 - Certification of Program and Project Managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Certification of Program and Project Managers. 301.607 Section 301.607 Federal Acquisition Regulations System HEALTH AND HUMAN... Responsibilities 301.607 Certification of Program and Project Managers. ...

  11. A Management Information System Model for Program Management. Ph.D. Thesis - Oklahoma State Univ.; [Computerized Systems Analysis

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1972-01-01

    The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

  12. 78 FR 69651 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Dispute Resolution Act (ADR); DIA Instruction 5145.001, Conflict Management Program; DIA Manual 60-1... to add a new system of records notice, LDIA 13-0001, Conflict Management Programs, to its existing... Opportunity (EO) Program, Alternate Dispute Resolution Program (ADR), Employee Grievance System, and...

  13. Total Quality Management: Will It Work in the System Program Office?

    DTIC Science & Technology

    1990-05-01

    Quality Management (TQM) is a relatively new philosophy of management which has high-level Department of Defense support and is presently being implemented in the Air Force. In the Air Force Systems Command, weapon system development and acquisition are carried out in System Program Offices (SPOs), staffed with various functionally oriented specialists supplied to the System Program Director by functional ’home offices’ via a matrix management scheme. Can TQM, relying as it does on cross-functional cooperation and on processes which cross functional lines, be

  14. Organizational technologies of chronic disease management programs in large rural multispecialty group practice systems.

    PubMed

    Gamm, Larry; Bolin, Jane Nelson; Kash, Bita A

    2005-01-01

    Four large rural multispecialty group practice systems employ a mix of organizational technologies to provide chronic disease management with measurable impacts on their patient populations and costs. Four technologies-administrative, clinical, information, and social-are proposed as key dimensions for examining disease management programs. The benefits of disease management are recognized by these systems despite marked variability in the organization of the programs. Committees spanning health plans and clinics in the 4 systems and electronic medical records and/or other disease management information systems are important coordinating mechanisms. Increased reliance on nurses for patient education and care coordination in all 4 systems reflects significant extension of clinical and social technologies in the management of patient care. The promise of disease management as offered by these systems and other auspices are considered.

  15. 41 CFR 101-30.101-17 - Supply support.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....101-17 Section 101-30.101-17 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...; e.g., GSA stock program, Federal supply schedule program, GSA's buy-on-demand program, or GSA's...

  16. 41 CFR 101-30.101-17 - Supply support.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....101-17 Section 101-30.101-17 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...; e.g., GSA stock program, Federal supply schedule program, GSA's buy-on-demand program, or GSA's...

  17. 41 CFR 101-30.101-17 - Supply support.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....101-17 Section 101-30.101-17 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...; e.g., GSA stock program, Federal supply schedule program, GSA's buy-on-demand program, or GSA's...

  18. 41 CFR 101-30.101-17 - Supply support.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....101-17 Section 101-30.101-17 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...; e.g., GSA stock program, Federal supply schedule program, GSA's buy-on-demand program, or GSA's...

  19. 41 CFR 101-30.101-17 - Supply support.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....101-17 Section 101-30.101-17 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...; e.g., GSA stock program, Federal supply schedule program, GSA's buy-on-demand program, or GSA's...

  20. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaus, P.S.

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  1. Program Manager: Journal of the Defense Systems Management College, Volume 23, Number 3, DSMC 120, May-June 1994

    DTIC Science & Technology

    1994-06-01

    Defense Systems Management requirements for program executive College (DSMC). However. the sec- officers ( PEas ), program managers ond and third sets have...and presenting in- predictable outcomes in terms of cul- formation would change the entire tural change. t4 of culture. Once, carrier pigeons took days

  2. 76 FR 22613 - Privacy Act; Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... system of records, DA&M 01, entitled, ``Civil Liberties Program Case Management System'' from subsections...) System identifier and name: DA&M 01, Civil Liberties Program Case Management System. (i) Exemptions...

  3. Analysis of the Apollo spacecraft operational data management system. Executive summary

    NASA Technical Reports Server (NTRS)

    1971-01-01

    A study was made of Apollo, Skylab, and several other data management systems to determine those techniques which could be applied to the management of operational data for future manned spacecraft programs. The results of the study are presented and include: (1) an analysis of present data management systems, (2) a list of requirements for future operational data management systems, (3) an evaluation of automated data management techniques, and (4) a plan for data management applicable to future space programs.

  4. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  5. Management Methods Applied to Lunch Program. What Food Management Companies Can Do for You - 2

    ERIC Educational Resources Information Center

    Davidson, Kenneth R.

    1974-01-01

    In Joliet, Illinois, a food management system based on increased student participation in the school lunch program, was so successful that the controls developed to manage it were adopted as standard operating procedure in overall school system management. (Author/MLF)

  6. 23 CFR 973.206 - Funds for establishment, development, and implementation of the systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRANSPORTATION FEDERAL LANDS HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs Management Systems § 973.206 Funds for establishment, development, and implementation of the systems. The IRR program management funds may be used to...

  7. 76 FR 46774 - Privacy Act of 1974; System of Records-Federal Student Aid Application File

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Information and Regulatory Affairs in the Office of Management and Budget (OMB), on July 21, 2011. This... altered system of records to: Director, Application Processing Division, Program Management Systems...: Director, Application Processing Division, Program Management Systems, Federal Student Aid, U.S. Department...

  8. SOFIA Program SE and I Lessons Learned

    NASA Technical Reports Server (NTRS)

    Ray, Ronald J.; Fobel, Laura J.; Brignola, Michael P.

    2011-01-01

    Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

  9. AMA-Reddit Media Event

    NASA Image and Video Library

    2014-12-02

    NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. At left, is Mike Bolger, Ground Systems Development and Operations program manager. Not shown, but also participating were Mark Geyer, Orion program manager, and Todd May, Space Launch System program manager. Discussion topics include Mars and technology.

  10. 22 CFR 518.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Purpose of financial and program management. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.20 Purpose of financial and program management. Sections 518.21 through 518.28 prescribe standards for financial management systems, methods for...

  11. 34 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Purpose of financial and program management. 74.20... Requirements Financial and Program Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments...

  12. 22 CFR 145.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose of financial and program management... Financial and Program Management § 145.20 Purpose of financial and program management. Sections 145.21 through 145.28 prescribe standards for financial management systems, methods for making payments and rules...

  13. 2 CFR 215.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Purpose of financial and program management... Financial and Program Management § 215.20 Purpose of financial and program management. Sections 215.21 through 215.28 prescribe standards for financial management systems, methods for making payments and rules...

  14. 5 CFR 10.3 - OPM authority to review personnel management programs and practices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... management programs and practices. 10.3 Section 10.3 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE RULES AGENCY ACCOUNTABILITY SYSTEMS; OPM AUTHORITY TO REVIEW PERSONNEL MANAGEMENT PROGRAMS (RULE X) § 10.3 OPM authority to review personnel management programs and practices. The Office of...

  15. Parallel processing for scientific computations

    NASA Technical Reports Server (NTRS)

    Alkhatib, Hasan S.

    1991-01-01

    The main contribution of the effort in the last two years is the introduction of the MOPPS system. After doing extensive literature search, we introduced the system which is described next. MOPPS employs a new solution to the problem of managing programs which solve scientific and engineering applications on a distributed processing environment. Autonomous computers cooperate efficiently in solving large scientific problems with this solution. MOPPS has the advantage of not assuming the presence of any particular network topology or configuration, computer architecture, or operating system. It imposes little overhead on network and processor resources while efficiently managing programs concurrently. The core of MOPPS is an intelligent program manager that builds a knowledge base of the execution performance of the parallel programs it is managing under various conditions. The manager applies this knowledge to improve the performance of future runs. The program manager learns from experience.

  16. 32 CFR 239.13 - Program Performance Reviews.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... will prepare monthly program performance reviews using the Homeowners Assistance Program Management Information System; HQUSACE Annual Management Command Plan and Management Control Checklist. In addition...

  17. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  18. Comparing Occupational Health and Safety Management System Programming with Injury Rates in Poultry Production.

    PubMed

    Autenrieth, Daniel A; Brazile, William J; Douphrate, David I; Román-Muñiz, Ivette N; Reynolds, Stephen J

    2016-01-01

    Effective methods to reduce work-related injuries and illnesses in animal production agriculture are sorely needed. One approach that may be helpful for agriculture producers is the adoption of occupational health and safety management systems. In this replication study, the authors compared the injury rates on 32 poultry growing operations with the level of occupational health and safety management system programming at each farm. Overall correlations between injury rates and programming level were determined, as were correlations between individual management system subcomponents to ascertain which parts might be the most useful for poultry producers. It was found that, in general, higher levels of occupational health and safety management system programming were associated with lower rates of workplace injuries and illnesses, and that Management Leadership was the system subcomponent with the strongest correlation. The strength and significance of the observed associations were greater on poultry farms with more complete management system assessments. These findings are similar to those from a previous study of the dairy production industry, suggesting that occupational health and safety management systems may hold promise as a comprehensive way for producers to improve occupational health and safety performance. Further research is needed to determine the effectiveness of such systems to reduce farm work injuries and illnesses. These results are timely given the increasing focus on occupational safety and health management systems.

  19. AMA-Reddit Media Event

    NASA Image and Video Library

    2014-12-02

    NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager; and Mark Geyer, Orion program manager. Across from them, in the plaid shirt is Todd May, Space Launch System program manager. Discussion topics include Mars and technology.

  20. AMA-Reddit Media Event

    NASA Image and Video Library

    2014-12-02

    NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager. Also participating, but not shown in the photo is Todd May, Space Launch System program manager. Discussion topics include Mars and technology.

  1. KENNEDY SPACE CENTER, FLA. -- From left, United Space Alliance (USA) Deputy Space Shuttle Program Manager of Operations Loren Shriver, USA Associate Program Manager of Ground Operations Andy Allen, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and USA Vice President and Space Shuttle Program Manager Howard DeCastro examine a tile used in the Shuttle's Thermal Protection System (TPS) in KSC's TPS Facility. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, United Space Alliance (USA) Deputy Space Shuttle Program Manager of Operations Loren Shriver, USA Associate Program Manager of Ground Operations Andy Allen, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and USA Vice President and Space Shuttle Program Manager Howard DeCastro examine a tile used in the Shuttle's Thermal Protection System (TPS) in KSC's TPS Facility. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  2. Sandia National Laboratories California Waste Management Program Annual Report February 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brynildson, Mark E.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

  3. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  4. Pan Air Geometry Management System (PAGMS): A data-base management system for PAN AIR geometry data

    NASA Technical Reports Server (NTRS)

    Hall, J. F.

    1981-01-01

    A data-base management system called PAGMS was developed to facilitate the data transfer in applications computer programs that create, modify, plot or otherwise manipulate PAN AIR type geometry data in preparation for input to the PAN AIR system of computer programs. PAGMS is composed of a series of FORTRAN callable subroutines which can be accessed directly from applications programs. Currently only a NOS version of PAGMS has been developed.

  5. 75 FR 136 - Privacy Act of 1974; Systems of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-04

    ..., management of students in civilian institution programs, and course management for civil engineering... civilian institution programs, and course management for civil engineering education programs. Also...

  6. Sandia National Laboratories, California Environmental Management System program manual.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a setmore » of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.« less

  7. The Development and Testing of a Statewide Multilevel Curriculum Management System for Georgia Vocational Education Programs. Curriculum Management Handbook for Vocational Administrators in Comprehensive High Schools, Post-Secondary Area Vocational-Technical Schools and Community College Vocational Programs.

    ERIC Educational Resources Information Center

    Scott, Paul; Moye, Mike

    Developed to assist the building-level administrator in implementing a curriculum management system, this handbook considers two of five duties the vocational administrator must perform to meet the obligations of curriculum management: (1) performing curriculum management functions for the vocational program and (2) implementing and conducting an…

  8. 5 CFR 9701.107 - Program evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....107 Administrative Personnel DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM (DEPARTMENT OF HOMELAND SECURITY-OFFICE OF PERSONNEL MANAGEMENT) DEPARTMENT OF HOMELAND SECURITY HUMAN RESOURCES MANAGEMENT SYSTEM General Provisions § 9701.107 Program evaluation. (a) DHS will establish...

  9. Information management system study results. Volume 2: IMS study results appendixes

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Computer systems program specifications are presented for the modular space station information management system. These are the computer program contract end item, data bus system, data bus breadboard, and display interface adapter specifications. The performance, design, tests, and qualification requirements are established for the implementation of the information management system. For Vol. 1, see N72-19972.

  10. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning... management; and management and implementation level training in system/application life cycle management...

  11. 14 CFR 91.1431 - CAMP: Continuing analysis and surveillance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program manager who maintains program aircraft under a CAMP must establish and maintain a system for the... program manager or by another person. (b) Whenever the Administrator finds that the programs described in... program manager must, after notification by the Administrator, make changes in those programs requested by...

  12. 75 FR 27182 - Energy Conservation Program: Web-Based Compliance and Certification Management System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Conservation Program: Web-Based Compliance and Certification Management System AGENCY: Office of Energy... certification reports to the Department of Energy (DOE) through an electronic Web-based tool, the Compliance and... following means: 1. Compliance and Certification Management System (CCMS)--via the Web portal: http...

  13. The San Francisco Joint Institutional Transportation Systems Management Program.

    ERIC Educational Resources Information Center

    Fink, Ira; LaPointe, Robert

    1981-01-01

    Transportation systems management (TSM) programs are discussed, particularly the 1977 program of the University of California, San Francisco, which led to traffic reduction and improved vehicle flow. The city's implementation plan for a similar TSM program for 14 educational institutions and hospitals is described. (MLW)

  14. Management Data Base Development.

    ERIC Educational Resources Information Center

    Dan, Robert L.

    1975-01-01

    A management data base is seen as essential for a management information system, program budgeting, program costing, management by objectives, program evaluation, productivity measures, and accountability in institutions of higher education. The necessity of a management data base is addressed, along with the benefits and limitations it may have…

  15. A Model for a Single Unmanned Aircraft Systems (UAS) Program Office Managing Joint ISR Capabilities

    DTIC Science & Technology

    2017-10-01

    reduction in manning from the multiple program office structure to the new single program management model. Additional information regarding this...OFFICE MANAGING JOINT ISR CAPABILITIES by Angela E. Burris A Research Report Submitted to the Faculty In Partial Fulfillment of...research paper is to answer how a single management office could provide greater agility for unmanned aircraft systems (UAS); supporting Joint concepts

  16. KSC-2014-4647

    NASA Image and Video Library

    2014-12-02

    CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. At left, is Mike Bolger, Ground Systems Development and Operations program manager. Not shown, but also participating were Mark Geyer, Orion program manager, and Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin

  17. 40 CFR 30.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Program Management § 30.20 Purpose of financial and program management. Sections 30.21 through 30.28 prescribe standards for financial management systems, methods for making payments and rules for: satisfying... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Purpose of financial and program...

  18. 24 CFR 84.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and Program Management § 84.20 Purpose of financial and program management. Sections 84.21 through 84.28 prescribe standards for financial management systems, methods for making payments and rules for... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Purpose of financial and program...

  19. AMA-Reddit Media Event

    NASA Image and Video Library

    2014-12-02

    From left, Mike Bolger, Ground Systems Development and Operations program manager; and Mark Geyer, Orion program manager, participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Not shown is Todd May, Space Launch System program manager. Discussion topics include Mars and technology.

  20. Contracts and management services site support program plan WBS 6.10.14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1994-09-01

    Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Programmore » Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.« less

  1. Systems approach provides management control of complex programs

    NASA Technical Reports Server (NTRS)

    Dudek, E. F., Jr.; Mc Carthy, J. F., Jr.

    1970-01-01

    Integrated program management process provides management visual assistance through three interrelated charts - system model that identifies each function to be performed, matrix that identifies personnel responsibilities for these functions, process chart that breaks down the functions into discrete tasks.

  2. 42 CFR 456.700 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ASSISTANCE PROGRAMS UTILIZATION CONTROL Drug Use Review (DUR) Program and Electronic Claims Management System... outpatient DUR program that includes prospective drug review, retrospective drug use review, and an... optional point-of-sale electronic claims management system for processing claims for covered outpatient...

  3. 41 CFR 102-74.100 - What are conservation programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT... programs are programs that improve energy and water efficiency and promote the use of solar and other...

  4. 41 CFR 102-74.100 - What are conservation programs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT... programs are programs that improve energy and water efficiency and promote the use of solar and other...

  5. SLFP: a stochastic linear fractional programming approach for sustainable waste management.

    PubMed

    Zhu, H; Huang, G H

    2011-12-01

    A stochastic linear fractional programming (SLFP) approach is developed for supporting sustainable municipal solid waste management under uncertainty. The SLFP method can solve ratio optimization problems associated with random information, where chance-constrained programming is integrated into a linear fractional programming framework. It has advantages in: (1) comparing objectives of two aspects, (2) reflecting system efficiency, (3) dealing with uncertainty expressed as probability distributions, and (4) providing optimal-ratio solutions under different system-reliability conditions. The method is applied to a case study of waste flow allocation within a municipal solid waste (MSW) management system. The obtained solutions are useful for identifying sustainable MSW management schemes with maximized system efficiency under various constraint-violation risks. The results indicate that SLFP can support in-depth analysis of the interrelationships among system efficiency, system cost and system-failure risk. Copyright © 2011 Elsevier Ltd. All rights reserved.

  6. 25 CFR 170.503 - How are IRR Program management systems funded?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How are IRR Program management systems funded? 170.503 Section 170.503 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...

  7. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  8. Reengineering outcomes management: an integrated approach to managing data, systems, and processes.

    PubMed

    Neuman, K; Malloch, K; Ruetten, V

    1999-01-01

    The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.

  9. A Comparative Analysis of the Resources Required for Test and Evaluation on Army-Led Weapon System Programs, Based Upon Program Size and Acquisition Management Complexity

    DTIC Science & Technology

    2007-12-01

    Program Manager PMO Program Manager Office POM Program Objective Memorandum PPE Personal Protective Equipment PPT Production Prove...test • Technical feasibility test • Engineering development test • Production prove-out test ( PPT ) • Software qualification test 22 • Live fire...improvement BIDS (P3I) system is equipped with a detection suite to include high volume samplers, a fluorescent particle counter/sizer, a flow

  10. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  11. AMA-Reddit Media Event

    NASA Image and Video Library

    2014-12-02

    NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Participating are Mike Bolger, Ground Systems Development and Operations program manager Mark Geyer, Orion program manager and Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Monitoring the live discussion is Brandi Dean, public affairs specialist from Johnson Space Center in Houston.

  12. KSC-2014-4645

    NASA Image and Video Library

    2014-12-02

    CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager. Also participating, but not shown in the photo is Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin

  13. KSC-2014-4644

    NASA Image and Video Library

    2014-12-02

    CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. From left, are Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager. Across from them, in the plaid shirt is Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin

  14. Program Manager: Journal of the Defense Systems Management College. Volume 23, Number 1, January-February 1994

    DTIC Science & Technology

    1994-02-01

    Jones, Jr. PROGRAM MANAGER Managing Editor Esther M. Farria Art Director Greg Caruth Typography and Design Paula Croisetlere Program Manager (ISSN 0199...Company bombers to implement the strategic organization - President Clayton 1. Brukner commu- bombing doctrine. This would take all brand -new cre

  15. Management Development and Training Program for Colleges and Universities. Program Handbook, May 1978.

    ERIC Educational Resources Information Center

    Higher Education Management Inst., Coconut Grove, FL.

    A Management Development and Training Program has been developed by the Higher Education Management Institute to improve the overall functioning of higher education organizations. The Institute believes management development and training can: add to individuals' knowledge and skills, increase awareness of management processes and systems;…

  16. Building Management Information Systems to Coordinate Citywide Afterschool Programs: A Toolkit for Cities. Executive Summary

    ERIC Educational Resources Information Center

    Kingsley, Chris

    2012-01-01

    This executive summary describes highlights from the report, "Building Management Information Systems to Coordinate Citywide Afterschool Programs: A Toolkit for Cities." City-led efforts to build coordinated systems of afterschool programming are an important strategy for improving the health, safety and academic preparedness of children…

  17. Emergency management training program: Guide to good practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-07-01

    The Emergency Management Training Program Guide to Good Practice is a project of the Training Resources and Data Exchange (TRADE) Emergency Management Issues Special Interest Group (EMI SIG). EMI SIG members expressed interest in a resource to assist in development of a comprehensive emergency management training program. This publication provides guidelines, methods, and materials for EMI SIG members to use, assisting in complete and effective emergency management programs. The purposes of the Emergency Management Training Program Guide to Good Practice are: Provide guidance in the development and management of Emergency Management (EM) training programs; Assist EM trainers to incorporate componentsmore » of the DOE Emergency Management System philosophy of planning, preparedness, readiness assurance, and response into EM training programs; Help EM training managers meet EM training requirements and conditions established by current regulations and policies; Supplement other TRADE EMI SIG documents and complement individual facility training documents. This program is designed for emergency management personnel who are responsible for providing or overseeing EM training but who do not necessarily possess expertise in developing training. It provides good practices from the manager`s point of view on how to produce, administer, and document facility EM training programs in the spirit of the DOE EM system philosophy. Basic guidance is also included for personnel who design, develop, deliver, and/or evaluate EM training programs or parts. This guidance includes key points of EM training programs and identifies other documents that contain useful and/or more detailed training information.« less

  18. Data Management Plan and Functional System Design for the Information Management System of the Clinch River Remedial Investigation and Waste Area Grouping 6

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, T.; Brandt, C.; Calfee, J.

    1994-03-01

    The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less

  19. Repository-Based Software Engineering Program: Working Program Management Plan

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Repository-Based Software Engineering Program (RBSE) is a National Aeronautics and Space Administration (NASA) sponsored program dedicated to introducing and supporting common, effective approaches to software engineering practices. The process of conceiving, designing, building, and maintaining software systems by using existing software assets that are stored in a specialized operational reuse library or repository, accessible to system designers, is the foundation of the program. In addition to operating a software repository, RBSE promotes (1) software engineering technology transfer, (2) academic and instructional support of reuse programs, (3) the use of common software engineering standards and practices, (4) software reuse technology research, and (5) interoperability between reuse libraries. This Program Management Plan (PMP) is intended to communicate program goals and objectives, describe major work areas, and define a management report and control process. This process will assist the Program Manager, University of Houston at Clear Lake (UHCL) in tracking work progress and describing major program activities to NASA management. The goal of this PMP is to make managing the RBSE program a relatively easy process that improves the work of all team members. The PMP describes work areas addressed and work efforts being accomplished by the program; however, it is not intended as a complete description of the program. Its focus is on providing management tools and management processes for monitoring, evaluating, and administering the program; and it includes schedules for charting milestones and deliveries of program products. The PMP was developed by soliciting and obtaining guidance from appropriate program participants, analyzing program management guidance, and reviewing related program management documents.

  20. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...

  1. 5 CFR 930.301 - Information systems security awareness training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... training in system/application life cycle management, risk management, and contingency planning. (4) Chief... security management, system/application life cycle management, risk management, and contingency planning..., risk management, and contingency planning. (b) Provide the Federal information systems security...

  2. Officer Computer Utilization Report

    DTIC Science & Technology

    1992-03-01

    Shipboard Non-tactical ADP Program (SNAP),Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM)). Mainframe - An extremely...ADP Program (SNAP), Navy Intelligence Processing System (NIPS), Retail Operation Management (ROM), etc.) @0230@6 7 7. Technical/tactical systems (e.g

  3. R and D Productivity: New Challenges for the US Space Program

    NASA Technical Reports Server (NTRS)

    Baskin, O. W. (Editor); Sullivan, L. J. (Editor)

    1985-01-01

    Various topics related to research and development activities applicable to their U.S. space program are discussed. Project management, automatic control technology, human resources, management information systems, computer aided design, systems engineering, and personnel management were among the topics covered.

  4. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  5. Nurse manager orientation.

    PubMed

    Hawkins, Anne; Carter, Kelly; Nugent, Mary

    2009-01-01

    On the basis of the principles of management and leadership, our organization has worked over the years to formalize the orientation program for new nurse managers. This program meets the needs of new nurse managers and responds to today's complex health care system needs. This article describes the components of a nurse manager orientation program for the novice nurse manager and methods for evaluating nurse manager effectiveness.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less

  7. Development of Integrated Programs for Aerospace-vehicle design (IPAD): Integrated information processing requirements

    NASA Technical Reports Server (NTRS)

    Southall, J. W.

    1979-01-01

    The engineering-specified requirements for integrated information processing by means of the Integrated Programs for Aerospace-Vehicle Design (IPAD) system are presented. A data model is described and is based on the design process of a typical aerospace vehicle. General data management requirements are specified for data storage, retrieval, generation, communication, and maintenance. Information management requirements are specified for a two-component data model. In the general portion, data sets are managed as entities, and in the specific portion, data elements and the relationships between elements are managed by the system, allowing user access to individual elements for the purpose of query. Computer program management requirements are specified for support of a computer program library, control of computer programs, and installation of computer programs into IPAD.

  8. Emergency management training program: Guide to good practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-07-01

    The Emergency Management Training Program Guide to Good Practice is a project of the Training Resources and Data Exchange (TRADE) Emergency Management Issues Special Interest Group (EMI SIG). EMI SIG members expressed interest in a resource to assist in development of a comprehensive emergency management training program. This publication provides guidelines, methods, and materials for EMI SIG members to use, assisting in complete and effective emergency management programs. The purposes of the Emergency Management Training Program Guide to Good Practice are: Provide guidance in the development and management of Emergency Management (EM) training programs; Assist EM trainers to incorporate componentsmore » of the DOE Emergency Management System philosophy of planning, preparedness, readiness assurance, and response into EM training programs; Help EM training managers meet EM training requirements and conditions established by current regulations and policies; Supplement other TRADE EMI SIG documents and complement individual facility training documents. This program is designed for emergency management personnel who are responsible for providing or overseeing EM training but who do not necessarily possess expertise in developing training. It provides good practices from the manager's point of view on how to produce, administer, and document facility EM training programs in the spirit of the DOE EM system philosophy. Basic guidance is also included for personnel who design, develop, deliver, and/or evaluate EM training programs or parts. This guidance includes key points of EM training programs and identifies other documents that contain useful and/or more detailed training information.« less

  9. Program Management Tool

    NASA Technical Reports Server (NTRS)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

  10. Development of integrated programs for Aerospace-vehicle Design (IPAD): Product program management systems

    NASA Technical Reports Server (NTRS)

    Isenberg, J. M.; Southall, J. W.

    1979-01-01

    The Integrated Programs for Aerospace Vehicle Design (IPAD) is a computing system to support company-wide design information processing. This document presents a brief description of the management system used to direct and control a product-oriented program. This document, together with the reference design process (CR 2981) and the manufacture interactions with the design process (CR 2982), comprises the reference information that forms the basis for specifying IPAD system requirements.

  11. 15 CFR 14.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.20 Purpose of financial and program management. Sections 14.21 through 14.28 prescribe standards for financial management systems, methods for making payments and rules for: satisfying cost sharing and...

  12. Program Management Collection. "LINCS" Resource Collection News

    ERIC Educational Resources Information Center

    Literacy Information and Communication System, 2011

    2011-01-01

    This edition of "'LINCS' Resource Collection News" features the Program Management Collection, which covers the topics of Assessment, Learning Disabilities, and Program Improvement. Each month Collections News features one of the three "LINCS" (Literacy Information and Communication System) Resource Collections--Basic Skills, Program Management,…

  13. Management Principles to be Considered for Implementing a Data Base Management System Aboard U.S. (United States) Naval Ships under the Shipboard Non-Tactical ADP (Automated Data Processing) Program.

    DTIC Science & Technology

    1982-12-01

    Data Base Management System Aboard U.S. Naval Ships Under the Shipboard Non-tactical ADP Program by Robert Harrison Dixon December 1982 Thesis Advisor...OF REPORT a PERIOD COVIAOtt Management Principles to be Considered for Master’s Thesis Implementing a Data Base Management System December 1982 Aboard...NOTES is. KEY s0mas (Coelte on revrs side of 0..e..mp am iNe or "Neo 00111) Data Base Management System , DBMS, SNAP, SNAP I, SNAP II, Information

  14. Tank waste remediation system systems engineering management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves.more » The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.« less

  15. Publications of the NASA CELSS (Controlled Ecological Life Support Systems) program

    NASA Technical Reports Server (NTRS)

    Dufour, P. A.; Solberg, J. L.; Wallace, J. S.

    1985-01-01

    Publications on research sponsored by the NASA CELSS (controlled ecological life support systems) Program are listed. The bibliography is divided into four areas: (1) human requirements; (2) food production; (3) waste management; and (4) system management and control. The 210 references cover the period from the inception of the CELSS Program (1979) to the present, as well as some earlier publications during the development of the CELSS Program.

  16. 45 CFR 74.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Purpose of financial and program management. 74.20... Management § 74.20 Purpose of financial and program management. Sections 74.21 through 74.28 prescribe standards for financial management systems, methods for making payments, and rules for satisfying cost...

  17. 41 CFR 105-72.300 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Purpose of financial and.../Financial and Program Management § 105-72.300 Purpose of financial and program management. Sections 105-72.301 through 105-72.308 prescribe standards for financial management systems, methods for making...

  18. Case Study of the U.S. Army’s Should-Cost Management Implementation

    DTIC Science & Technology

    2013-12-03

    and Pelvic Protection Systems (PPS). After graduating from the Naval Postgraduate School, Major Choi will be assigned to the U.S. Army...Systems PMO Product/Project/Program Management Office PMT Program Management Training POA&M Plan of Action and Milestones POE Program Office...Intelligence, Electronic Warfare and Sensors  PEO Simulation, Training , and Instrumentation  JPEO Chemical and Biological Defense The researcher

  19. One System for Blood Program Information Management

    PubMed Central

    Gero, Michael G.; Klickstein, Judith S.; Hurst, Timm M.

    1980-01-01

    A system which integrates the diverse functions of a Blood Program within one structure is being assembled at the American National Red Cross Blood Services, Northeast Region. When finished, it will provide technical support for collection scheduling, donor recruitment, recordkeeping, laboratory processing, inventory management, HLA typing and matching, distribution, and administration within the Program. By linking these applications, a reporting structure useful to top management will be provided.

  20. 28 CFR 70.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.20 Purpose of financial and program management. Sections 70.21 through 70.28 prescribe standards for financial management systems, methods for making payments and rules for: Satisfying cost sharing and...

  1. Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration

    NASA Technical Reports Server (NTRS)

    Greene, William D.

    2013-01-01

    System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.

  2. The evolution of educational information systems and nurse faculty roles.

    PubMed

    Nelson, Ramona; Meyers, Linda; Rizzolo, Mary Anne; Rutar, Pamela; Proto, Marcia B; Newbold, Susan

    2006-01-01

    Institutions of higher education are purchasing and/or designing sophisticated administrative information systems to manage such functions as the application, admissions, and registration process, grants management, student records, and classroom scheduling. Although faculty also manage large amounts of data, few automated systems have been created to help faculty improve teaching and learning through the management of information related to individual students, the curriculum, educational programs, and program evaluation. This article highlights the potential benefits that comprehensive educational information systems offer nurse faculty.

  3. Compliance program data management system for The Idaho National Engineering Laboratory/Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hertzler, C.L.; Poloski, J.P.; Bates, R.A.

    1988-01-01

    The Compliance Program Data Management System (DMS) developed at the Idaho National Engineering Laboratory (INEL) validates and maintains the integrity of data collected to support the Consent Order and Compliance Agreement (COCA) between the INEL and the Environmental Protection Agency (EPA). The system uses dBase III Plus programs and dBase III Plus in an interactive mode to enter, store, validate, manage, and retrieve analytical information provided on EPA Contract Laboratory Program (CLP) forms and CLP forms modified to accommodate 40 CFR 264 Appendix IX constituent analyses. Data analysis and presentation is performed utilizing SAS, a statistical analysis software program. Archivingmore » of data and results is performed at appropriate stages of data management. The DMS is useful for sampling and analysis programs where adherence to EPA CLP protocol, along with maintenance and retrieval of waste site investigation sampling results is desired or requested. 3 refs.« less

  4. Matrix management for aerospace 2000

    NASA Technical Reports Server (NTRS)

    Mccarthy, J. F., Jr.

    1980-01-01

    The martix management approach to program management is an organized effort for attaining program objectives by defining and structuring all elements so as to form a single system whose parts are united by interaction. The objective of the systems approach is uncompromisingly complete coverage of the program management endeavor. Starting with an analysis of the functions necessary to carry out a given program, a model must be defined; a matrix of responsibility assignment must be prepared; and each operational process must be examined to establish how it is to be carried out and how it relates to all other processes.

  5. Space America's commercial space program

    NASA Technical Reports Server (NTRS)

    Macleod, N. H.

    1984-01-01

    Space America prepared a private sector land observing space system which includes a sensor system with eight spectral channels configured for stereoscopic data acquisition of four stereo pairs, a spacecraft bus with active three-axis stabilization, a ground station for data acquisition, preprocessing and retransmission. The land observing system is a component of Space America's end-to-end system for Earth resources management, monitoring and exploration. In the context of the Federal Government's program of commercialization of the US land remote sensing program, Space America's space system is characteristic of US industry's use of advanced technology and of commercial, entrepreneurial management. Well before the issuance of the Request for Proposals for Transfer of the United States Land Remote Sensing Program to the Private Sector by the US Department of Commerce, Space Services, Inc., the managing venturer of Space America, used private funds to develop and manage its sub-orbital launch of its Conestoga launch vehicle.

  6. Concepts. The Journal of Defense Systems Acquisition Management. Winter 1981. Volume 4. Number 1.

    DTIC Science & Technology

    1981-01-01

    Long, USAF A major challenge facing the program manager is to effectively obtain and manage program funds. It is the author’s view that too few...Henry H. Mendenhall As defense systems become more and more complex, an effective test and evaluation program becomes more and more necessary. This means...that lies ahead for the military acquisition manager. And let us not think for a moment that optimism alone will suffice. Good, effective , efficient

  7. KSC-2014-4646

    NASA Image and Video Library

    2014-12-02

    CAPE CANAVERAL, Fla. – NASA managers participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Participating are Mike Bolger, Ground Systems Development and Operations program manager Mark Geyer, Orion program manager and Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Monitoring the live discussion is Brandi Dean, public affairs specialist from Johnson Space Center in Houston. Photo credit: NASA/Frankie Martin

  8. 38 CFR 49.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Program Management § 49.20 Purpose of financial and program management. Sections 49.21 through 49.28 prescribe standards for financial management systems, methods for making payments and rules for: satisfying... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Purpose of financial and...

  9. 77 FR 74178 - Notice of Intent To Grant Exclusive Patent License: Kismet Management Fund LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ...,248: Program Control for Resource Management Architecture and Corresponding Programs//U.S. Patent No. 7,171,654: System Specification Language for Resource Management Architecture and Corresponding... Architecture and Corresponding Programs//U.S. Patent No. 7,552,438: Resource Management Device. DATES: Anyone...

  10. 36 CFR 1210.20 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Financial and Program Management § 1210.20 Purpose of financial and program management. Sections 1210.21 through 1210.28 prescribe standards for financial management systems, methods for making payments and... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Purpose of financial and...

  11. 14 CFR 1260.120 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Purpose of financial and program management... Requirements § 1260.120 Purpose of financial and program management. Sections 1260.121 through 1260.128 prescribe standards for financial management systems, methods for making payments and rules for: satisfying...

  12. 49 CFR 192.913 - When may an operator deviate its program from certain requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management program. An operator that uses a performance-based approach that satisfies the requirements for... to demonstrate the exceptional performance of its integrity management program through the following... to the operator's pipeline system and to the operator's integrity management program; (vi) A...

  13. 2017 TRIAD Small Business Advisory Panel

    DTIC Science & Technology

    2017-10-11

    government service in 2007 as the Science & Technology (S&T) Project Manager for the United States Navy’s Unmanned Maritime Systems Program Office...National Renewable Energy Laboratory (NREL) as a Program Manager for over 110 energy and water projects on military installations. He worked... management , project management , program management , donor relation service, contract and subcontract policy development and implementation, data integrity

  14. Pathways Triple P and the Child Welfare System: A Promising Fit.

    PubMed

    Petra, Megan; Kohl, Patricia

    2010-04-01

    Parents referred to the child welfare system following maltreatment allegations are often ill-prepared to constructively address child disruptive behaviors, despite the high prevalence of these behaviors among this population. Evidence-based parent-mediated interventions are effective in improving parenting skills; however, they are rarely offered within the child welfare system. The purpose of this pilot project was to evaluate the fit and acceptability of one parent-mediated training program (Pathways Triple P) to case managers and parents within this system of care. We implemented Pathways Triple P and subsequently interviewed referring case managers and parents who had participated in the program. Case managers felt the program would work well within the existing child welfare system and would help them to better serve parents. They felt the program had potential to improve parenting skills and prevent future maltreatment. Parents appreciated the program's use of diverse methods, and the variety of parenting techniques taught. In keeping with case manager expectations, participants reported that their enhanced parenting skills and new ability to use non-physical discipline resulted in a better home life. We conclude that Pathways Triple P fits well within the child welfare system and is acceptable to both case managers and parents within this system.

  15. Hospitality Management Education and Training.

    ERIC Educational Resources Information Center

    Brotherton, Bob, Ed.; And Others

    1995-01-01

    Seven articles on hospitality management training discuss the following: computerized management games for restaurant manager training, work placement, real-life exercises, management information systems in hospitality degree programs, modular programming, service quality concepts in the curriculum, and General National Vocational Qualifications…

  16. 75 FR 79308 - Alcohol and Drug Testing: Determination of Minimum Random Testing Rates for 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... from Management Information System annual reports, FRA has determined that the 2009 rail industry... program data taken from FRA's Management Information System. Based on this data, the Administrator... effective December 20, 2010. FOR FURTHER INFORMATION CONTACT: Lamar Allen, Alcohol and Drug Program Manager...

  17. 75 FR 33736 - List of Approved Spent Fuel Storage Casks: MAGNASTOR System, Revision 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... Management Programs, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone (301) 415- 6219..., 11555 Rockville Pike, Rockville, Maryland. NRC's Agencywide Documents Access and Management System... M. McCausland, Office of Federal and State Materials and Environmental Management Programs, U.S...

  18. Decision support systems for transportation system management and operations (TSM&O) : [summary].

    DOT National Transportation Integrated Search

    2016-01-01

    The Transportation System Management and Operations (TSM&O) program of the Florida : Department of Transportation (FDOT) has seven objectives, which are listed in the TSM&O : Tier 2 business plan. Two important objectives of the program are to con...

  19. 32 CFR 324.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to prevent misuse of such information. Advises the Program Manager that systems notices must be published in the Federal Register prior to collecting or maintenance of the information. Submits system... misuse of such information. Advises the Program Manager that systems notices must be published in the...

  20. KSC-2014-4648

    NASA Image and Video Library

    2014-12-02

    CAPE CANAVERAL, Fla. – From left, Mike Bolger, Ground Systems Development and Operations program manager and Mark Geyer, Orion program manager, participate in a live online Ask Me Anything, or AMA, session for reddit.com followers during Orion preflight activities at NASA Kennedy Space Center's News Center in Florida. Not shown, but also participating is Todd May, Space Launch System program manager. Discussion topics include Mars and technology. Photo credit: NASA/Frankie Martin

  1. 49 CFR 1.33 - Assistant Secretary for Budget and Programs and Chief Financial Officer.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Programs and CFO, in consultation with the Chief Information Officer, may designate any information technology system as a financial management system under the CFO's policy and oversight area of... oversight and policy guidance for all budget, financial management, program performance, and internal...

  2. 49 CFR 1.33 - Assistant Secretary for Budget and Programs and Chief Financial Officer.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Programs and CFO, in consultation with the Chief Information Officer, may designate any information technology system as a financial management system under the CFO's policy and oversight area of... oversight and policy guidance for all budget, financial management, program performance, and internal...

  3. 49 CFR 1.33 - Assistant Secretary for Budget and Programs and Chief Financial Officer.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Programs and CFO, in consultation with the Chief Information Officer, may designate any information technology system as a financial management system under the CFO's policy and oversight area of... oversight and policy guidance for all budget, financial management, program performance, and internal...

  4. Improving Performance of the System Safety Function at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Kiessling, Ed; Tippett, Donald D.; Shivers, Herb

    2004-01-01

    The Columbia Accident Investigation Board (CAIB) determined that organizational and management issues were significant contributors to the loss of Space Shuttle Columbia. In addition, the CAIB observed similarities between the organizational and management climate that preceded the Challenger accident and the climate that preceded the Columbia accident. To prevent recurrence of adverse organizational and management climates, effective implementation of the system safety function is suggested. Attributes of an effective system safety program are presented. The Marshall Space Flight Center (MSFC) system safety program is analyzed using the attributes. Conclusions and recommendations for improving the MSFC system safety program are offered in this case study.

  5. 23 CFR 973.210 - Indian lands bridge management system (BMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands bridge management system (BMS). 973.210... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs Management Systems § 973.210 Indian lands bridge management system (BMS...

  6. 23 CFR 973.214 - Indian lands congestion management system (CMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands congestion management system (CMS). 973.214... HIGHWAYS MANAGEMENT SYSTEMS PERTAINING TO THE BUREAU OF INDIAN AFFAIRS AND THE INDIAN RESERVATION ROADS PROGRAM Bureau of Indian Affairs Management Systems § 973.214 Indian lands congestion management system...

  7. Rhode Island congestion management plan : executive summary

    DOT National Transportation Integrated Search

    1997-09-01

    This document provides an overview of the Rhode Island Congestion Management System (CMS) program consisting of the following: Congestion Management System Plan; Incident Management Plan; and Intelligent Transportation System (ITS) Early Deployment P...

  8. Overview of Medicaid capitation and case-management initiatives

    PubMed Central

    Freund, Deborah A.; Neuschler, Edward

    1986-01-01

    Case-management programs have grown in number and in acceptance in the Medicaid program since 1981. In this article, we review their structure and incentives as well as what is known about their impact on cost and use. These programs also have been difficult to implement, posing myriad management challenges for prepaid program managers and State administrators. We highlight the problems in the following areas: eligibility, enrollment, rate setting, and management information systems. PMID:10311923

  9. 12 CFR 600.4 - Organization of the Farm Credit Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Agency's chartering activities; and analyzes policy and strategic risks to the System. (6) Office of Management Services. The Office of Management Services provides financial management services. It administers the Agency's information resources management program; human resources management program; and...

  10. 12 CFR 600.4 - Organization of the Farm Credit Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agency's chartering activities; and analyzes policy and strategic risks to the System. (6) Office of Management Services. The Office of Management Services provides financial management services. It administers the Agency's information resources management program; human resources management program; and...

  11. Earthquake Information System

    NASA Technical Reports Server (NTRS)

    1991-01-01

    IAEMIS (Integrated Automated Emergency Management Information System) is the principal tool of an earthquake preparedness program developed by Martin Marietta and the Mid-America Remote Sensing Center (MARC). It is a two-component set of software, data and procedures to provide information enabling management personnel to make informed decisions in disaster situations. The NASA-developed program ELAS, originally used to analyze Landsat data, provides MARC with a spatially-oriented information management system. Additional MARC projects include land resources management, and development of socioeconomic data.

  12. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  13. SDDOT transportation systems management & operations program plan.

    DOT National Transportation Integrated Search

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  14. An inexact multistage fuzzy-stochastic programming for regional electric power system management constrained by environmental quality.

    PubMed

    Fu, Zhenghui; Wang, Han; Lu, Wentao; Guo, Huaicheng; Li, Wei

    2017-12-01

    Electric power system involves different fields and disciplines which addressed the economic system, energy system, and environment system. Inner uncertainty of this compound system would be an inevitable problem. Therefore, an inexact multistage fuzzy-stochastic programming (IMFSP) was developed for regional electric power system management constrained by environmental quality. A model which concluded interval-parameter programming, multistage stochastic programming, and fuzzy probability distribution was built to reflect the uncertain information and dynamic variation in the case study, and the scenarios under different credibility degrees were considered. For all scenarios under consideration, corrective actions were allowed to be taken dynamically in accordance with the pre-regulated policies and the uncertainties in reality. The results suggest that the methodology is applicable to handle the uncertainty of regional electric power management systems and help the decision makers to establish an effective development plan.

  15. 41 CFR 101-6.2103 - What programs and activities of GSA are subject to these regulations?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true What programs and... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS...? The Administrator publishes in the Federal Register a list of GSA's programs and activities that are...

  16. 10 CFR 600.310 - Purpose of financial and program management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Purpose of financial and program management. 600.310... Requirements § 600.310 Purpose of financial and program management. Sections 600.311 through 600.318 prescribe standards for financial management systems; methods for making payments; and rules for cost sharing and...

  17. KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro are briefed on the properties of the tile used in the Shuttle's Thermal Protection System (TPS) by USA Manager of the TPS Facility Martin Wilson (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro are briefed on the properties of the tile used in the Shuttle's Thermal Protection System (TPS) by USA Manager of the TPS Facility Martin Wilson (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  18. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    NASA Technical Reports Server (NTRS)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  19. Disease management programs for CKD patients: the potential and pitfalls.

    PubMed

    Rocco, Michael V

    2009-03-01

    Disease management describes the use of a number of approaches to identify and treat patients with chronic health conditions, especially those that are expensive to treat. Disease management programs have grown rapidly in the United States in the past several years. These programs have been established for patients with chronic kidney disease (CKD), but some have been discontinued because of the high cost of the program. Disease management programs for CKD face unique challenges. Identification of patients with CKD is hampered by incomplete use of the International Classification of Diseases, Ninth Revision (ICD-9) codes for CKD by physicians and the less than universal use of estimated glomerular filtration rate from serum creatinine measurements to identify patients with an estimated glomerular filtration rate less than 60 mL/min/1.73 m(2). CKD affects multiple organ systems. Thus, a comprehensive disease management program will need to manage each of these aspects of CKD. These multiple interventions likely will make a CKD disease management program more costly than similar disease management programs designed for patients with diabetes mellitus, congestive heart failure, or other chronic diseases. The lack of data that can be used to develop effective disease management programs in CKD makes it difficult to determine goals for the management of each organ system affected by CKD. Finally, long periods of observation will be needed to determine whether a particular disease management program is effective in not only improving patient outcomes, but also decreasing both resource use and health care dollars. This long-term observation period is contrary to how most disease management contracts are written, which usually are based on meeting goals during a 1- to 3-year period. Until these challenges are resolved, it likely will be difficult to maintain effective disease management programs for CKD.

  20. PROGRAM-ORIENTED INFORMATION--A MANAGEMENT SYSTEMS COMPLEX FOR STATE EDUCATION AGENCIES. PART II, MANUAL OF ACCOUNTING AND RELATED FINANCIAL PROCEDURES.

    ERIC Educational Resources Information Center

    FRIEDMAN, BURTON DEAN; AND OTHERS

    THIS DOCUMENT IS THE SECOND PART OF A REPORT, PROGRAM-ORIENTED INFORMATION--A MANAGEMENT SYSTEMS COMPLEX FOR STATE EDUCATION AGENCIES. PART 1, EA 001 170, SUBTITLED "ANALYSIS AND PROPOSALS," CONTAINS AN OUTLINE OF THE NEED FOR A MANAGEMENT SYSTEMS COMPLEX WITHIN EACH STATE EDUCATION AGENCY. THIS DOCUMENT IS A MANUAL PRESENTING THE…

  1. 22 CFR 145.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Standards for financial management systems. 145... Financial and Program Management § 145.21 Standards for financial management systems. (a) The Department... whenever practical. (b) Recipients' financial management systems shall provide for the following. (1...

  2. 29 CFR 95.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Standards for financial management systems. 95.21 Section 95... Requirements Financial and Program Management § 95.21 Standards for financial management systems. (a... practical. (b) Recipients' financial management systems shall provide for the following: (1) Accurate...

  3. 7 CFR 3019.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Standards for financial management systems. 3019.21... Requirements Financial and Program Management § 3019.21 Standards for financial management systems. (a) Federal... cost information whenever practical. (b) Recipients' financial management systems shall provide for the...

  4. Integrated Baseline System (IBS) Version 2.0: Utilities Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burford, M.J.; Downing, T.R.; Williams, J.R.

    1994-03-01

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool being developed under the direction of the US Army Nuclear and Chemical Agency. This Utilities Guide explains how you can use the IBS utility programs to manage and manipulate various kinds of IBS data. These programs include utilities for creating, editing, and displaying maps and other data that are referenced to geographic location. The intended audience for this document are chiefly data managers but also system managers and some emergency management planners and analysts.

  5. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  6. Traffic management centers : the state-of-the-practice : task A : final working paper for design of support systems for advanced traffic management systems

    DOT National Transportation Integrated Search

    1999-02-01

    The goal of the Federal Highway Administration (FHWA) Expert Systems for Crash Data Collection Program was to use expert system technology to improve the accuracy and consistency of police-reported data. The program included the development and evalu...

  7. The Next Step in Educational Program Budgets and Information Resource Management: Integrated Data Structures.

    ERIC Educational Resources Information Center

    Jackowski, Edward M.

    1988-01-01

    Discusses the role that information resource management (IRM) plays in educational program-oriented budgeting (POB), and presents a theoretical IRM model. Highlights include design considerations for integrated data systems; database management systems (DBMS); and how POB data can be integrated to enhance its value and use within an educational…

  8. The planning and control of NASA programs and resources

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The major management systems used to plan and control NASA programs and resources are described as well as their integration to form the agency's general management approach in carrying out its mission. Documents containing more detailed descriptions of the processes and techniques involved in the agency's major management systems are listed.

  9. Management Information System for ESD Program Offices.

    DTIC Science & Technology

    1978-03-01

    Management Information System (MIS) functional requirements for the ESD Program Office are defined in terms of the Computer-Aided Design and Specification Tool. The development of the computer data base and a description of the MIS structure is included in the report. This report addresses management areas such as cost/budgeting, scheduling, tracking capabilities, and ECP

  10. Learning to Manage: A Program Just for Directors.

    ERIC Educational Resources Information Center

    Thomas, Megan E.

    1996-01-01

    Describes the Head Start-Johnson & Johnson Management Fellows program, whose mission is strengthening management skills of Head Start directors by providing training in human resources management, organizational design and development, financial management, computers and information systems, operations, marketing, and development of strategic…

  11. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    PubMed Central

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. Conclusions At the sites, project leaders served as travel guides, assisting and overseeing the programs as they traveled from the global plans to local actions. Project leaders, while hypothetically in control of the programs, in fact shared control of the traveling of the programs with patients, clinicians, and outside consultants. From this work, we can learn what roadblocks and expenses occur while a technology travels, from a project leader’s point of view. PMID:22578251

  12. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    PubMed

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served as travel guides, assisting and overseeing the programs as they traveled from the global plans to local actions. Project leaders, while hypothetically in control of the programs, in fact shared control of the traveling of the programs with patients, clinicians, and outside consultants. From this work, we can learn what roadblocks and expenses occur while a technology travels, from a project leader's point of view.

  13. Shuttle Program Information Management System (SPIMS) data base

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The Shuttle Program Information Management System (SPIMS) is a computerized data base operations system. The central computer is the CDC 170-730 located at Johnson Space Center (JSC), Houston, Texas. There are several applications which have been developed and supported by SPIMS. A brief description is given.

  14. The Development of a Planning, Programming and Budgeting System. Technical Report.

    ERIC Educational Resources Information Center

    Appelquist, Claes-Goran; Zandren, S.

    In CERI's program on institutional management in higher education, eight universities were brought together to set up teams within their institutions to work on their respective pre-selected problem areas. The planning, programming and budgeting system (PPBS) was developed as a management tool which would improve effectiveness by increasing the…

  15. A Perspective on a Management Information Systems (MIS) Program Review

    ERIC Educational Resources Information Center

    Yew, Bee K.

    2008-01-01

    This paper highlights relevant curriculum issues that were identified in a Management Information Systems (MIS) program review undertaken by a group of business faculty in a small regional university. The program review was initiated to improve job marketability of graduates and student enrollment. The review process is described as a collective…

  16. 7 CFR 1710.102 - Borrower eligibility for different types of loans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementation of demand side management, energy conservation programs, and on grid and off grid renewable energy... management, energy conservation programs, and on grid and off grid renewable energy systems. (c) One hundred..., energy conservation programs, and on grid and off grid renewable energy systems. (See 7 CFR part 1712...

  17. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  18. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  19. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  20. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  1. 23 CFR 973.208 - Indian lands pavement management system (PMS).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Indian lands pavement management system (PMS). 973.208... PROGRAM Bureau of Indian Affairs Management Systems § 973.208 Indian lands pavement management system (PMS... concepts described in the AASHTO's “Pavement Management Guide.” 1 1 “Pavement Management Guide,” AASHTO...

  2. 75 FR 21264 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Defense. A0030-22 AMC System name: Army Food Management Information System Records System location.... 9397, as amended. Purpose(s): The Army Food Management Information System will be used to automate the...: Supervisor, Army Food Management Information System, Program Manager, 401 First Street, Suite 157, Fort Lee...

  3. Environmental Files and Data Bases. Part A. Introduction and Oceanographic Management Information System.

    DTIC Science & Technology

    1981-09-01

    Management Information System Naval Oceanography Program Naval Oceanographic Requirements Acoustic Reference Service Research Vehicle...THE OCEANOGRAPHIC MANAGEMENT INFORMATION SYSTEM . .. .... 2-1 3. ACOUSTIC DATA .. .. .... ......... ...... 3-1 4. GEOLOGICAL AND GEOPHYSICAL DATA...36 CHAPTER 2 THE OCEANOGRAPHIC MANAGEMENT INFORMATION SYSTEM 2-i CHAPTER 2 THE OCEANOGRAPHIC MANAGEMENT INFORMATION SYSTEM CONTENTS Page

  4. KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians demonstrate the construction of a thermal blanket used in the Shuttle's thermal protection system for USA Vice President and Space Shuttle Program Manager Howard DeCastro (second from left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians demonstrate the construction of a thermal blanket used in the Shuttle's thermal protection system for USA Vice President and Space Shuttle Program Manager Howard DeCastro (second from left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  5. KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (third from left) watch as a USA technician (right) creates a tile for use in the Shuttle's Thermal Protection System (TPS). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (third from left) watch as a USA technician (right) creates a tile for use in the Shuttle's Thermal Protection System (TPS). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  6. 41 CFR 102-74.230 - Who is responsible for establishing an occupant emergency program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Occupant Emergency Program § 102-74.230 Who is... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who is responsible for...

  7. Project Management in NASA: The system and the men

    NASA Technical Reports Server (NTRS)

    Pontious, R. H.; Barnes, L. B.

    1973-01-01

    An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

  8. Fault management for data systems

    NASA Technical Reports Server (NTRS)

    Boyd, Mark A.; Iverson, David L.; Patterson-Hine, F. Ann

    1993-01-01

    Issues related to automating the process of fault management (fault diagnosis and response) for data management systems are considered. Substantial benefits are to be gained by successful automation of this process, particularly for large, complex systems. The use of graph-based models to develop a computer assisted fault management system is advocated. The general problem is described and the motivation behind choosing graph-based models over other approaches for developing fault diagnosis computer programs is outlined. Some existing work in the area of graph-based fault diagnosis is reviewed, and a new fault management method which was developed from existing methods is offered. Our method is applied to an automatic telescope system intended as a prototype for future lunar telescope programs. Finally, an application of our method to general data management systems is described.

  9. Exploration Systems Development (ESD) Approach to Enterprise Risk Management

    NASA Technical Reports Server (NTRS)

    Bauder, Stephen P.

    2014-01-01

    The National Aeronautics and Space Administration (NASA) Exploration Systems Development (ESD) Division has implemented an innovative approach to Enterprise Risk Management under a unique governance structure and streamlined integration model. ESD's mission is to design and build the capability to extend human existence to deep space. The Enterprise consists of three Programs: Space Launch System (SLS), Orion, and Ground Systems Development and Operations (GSDO). The SLS is a rocket and launch system that will be capable of powering humans, habitats, and support systems to deep space. Orion will be the first spacecraft in history capable of taking humans to multiple destinations within deep space. GSDO is modernizing Kennedy's spaceport to launch spacecraft built and designed by both NASA and private industry. ESD's approach to Enterprise Risk Management is commensurate with affordability and a streamlined management philosophy. ESD Enterprise Risk Management leverages off of the primary mechanisms for integration within the Enterprise. The Enterprise integration approach emphasizes delegation of authority to manage and execute the majority of cross-program activities and products to the individual Programs, while maintaining the overall responsibility for all cross-program activities at the Division. The intent of the ESD Enterprise Risk Management approach is to improve risk communication, to avoid replication and/or contradictory strategies, and to minimize overhead process burden. This is accomplished by the facilitation and integration of risk information within ESD. The ESD Division risks, Orion risks, SLS risks, and GSDO risks are owned and managed by the applicable Program. When the Programs have shared risks with multiple consequences, they are jointly owned and managed. When a risk is associated with the integrated system that involves more than one Program in condition, consequence, or mitigation plan, it is considered an Exploration Systems Integration (ESI) Risk. An ESI risk may require visibility and risk handling by multiple organizations. The Integrated Risk Working Group (IRWG) is a small team of Risk experts that are responsible for collaborating and communicating best practices. In addition, the forum facilitates proper integration of risks across the Enterprise. The IRWG uses a Continuous Risk Management approach for facilitating the identification, analysis, planning, tracking, and controlling of ESI Risks. The ESD Division, Programs, and Integrated Task Teams identify ESI Risks. The IRWG maintains a set of metrics for understanding Enterprise Risk process and the overall Risk Posture. The team is also actively involved in the modeling of risk for Enterprise Performance Management. With the Enterprise being constrained in Schedule and Budget, and with significant technical complexity, the appropriate use of Risk Management techniques is crucial to the success of the Enterprise. The IRWG achieves this through the modified approach, providing a forum for collaboration on risks that cross boundaries between the separate entities.

  10. MISOE [Management Information System for Occupational Education] Impact Battery.

    ERIC Educational Resources Information Center

    Conroy, William G., Jr.

    The impact battery consists of two instruments used to obtain impact data (descriptions of the experiences of program completors during post-program life) for the Sample Data Systems of the Management Information System for Occupational Education (MISOE). The first, Massachusetts Educational Impact Instrument (MEII), is an 11-page extensive…

  11. Neonatal Information System Using an Interactive Microcomputer Data Base Management Program

    PubMed Central

    Engelke, Stephen C.; Paulette, Ed W.; Kopelman, Arthur E.

    1981-01-01

    A low cost, interactive microcomputer data base management system is presented which is being used in a neonatal follow-up program at the East Carolina University School of Medicine. The features and flexibility of the system could be applied to a variety of medical care settings.

  12. 78 FR 55230 - Safety and Environmental Management System Requirements for Vessels on the U.S. Outer Continental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... that incorporates the management program and principles of API RP 75 is appropriate for vessels engaged... which would incorporate the management program and principles of API RP 75. Table 1 shows the current... to develop, implement, and maintain a SEMS that incorporates the management program and principles of...

  13. Economic efficiency and risk character of fire management programs, Northern Rocky Mountains

    Treesearch

    Thomas J. Mills; Frederick W. Bratten

    1988-01-01

    Economic efficiency and risk have long been considered during the selection of fire management programs and the design of fire management polices. The risk considerations was largely subjective, however, and efficiency has only recently been calculated for selected portions of the fire management program. The highly stochastic behavior of the fire system and the high...

  14. Navigator program risk management

    NASA Technical Reports Server (NTRS)

    Wessen, Randii R.; Padilla, Deborah A.

    2004-01-01

    In this paper, program risk management as applied to the Navigator Program: In Search of New Worlds will be discussed. The Navigator Program's goals are to learn how planetary systems form and to search for those worlds that could or do harbor life.

  15. Publications of the NASA Controlled Ecological Life Support System (CELSS) Program, 1979-1989

    NASA Technical Reports Server (NTRS)

    Wallace, Janice S.; Powers, Janet V.

    1990-01-01

    Publications of research sponsored by the NASA Controlled Ecological Life Support System (CELSS) Program from 1979 to 1989 are listed. The CELSS Program encompasses research and technology with the goal of developing an autonomous bioregenerative life support system that continually recycles the solid, liquid, and gaseous materials essential for human life. The bibliography is divided into four major subject areas: food production, nutritional requirements, waste management, and systems management and control.

  16. 20 CFR 668.800 - What systems must an INA grantee have in place to administer an INA program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... uses for: (1) The hiring and management of personnel paid with program funds; (2) The acquisition and management of property purchased with program funds; (3) Financial management practices; (4) A participant... to the best of his/her knowledge; and (3) The information necessary to comply with all program...

  17. 20 CFR 668.800 - What systems must an INA grantee have in place to administer an INA program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... uses for: (1) The hiring and management of personnel paid with program funds; (2) The acquisition and management of property purchased with program funds; (3) Financial management practices; (4) A participant... to the best of his/her knowledge; and (3) The information necessary to comply with all program...

  18. FSILP: fuzzy-stochastic-interval linear programming for supporting municipal solid waste management.

    PubMed

    Li, Pu; Chen, Bing

    2011-04-01

    Although many studies on municipal solid waste management (MSW management) were conducted under uncertain conditions of fuzzy, stochastic, and interval coexistence, the solution to the conventional linear programming problems of integrating fuzzy method with the other two was inefficient. In this study, a fuzzy-stochastic-interval linear programming (FSILP) method is developed by integrating Nguyen's method with conventional linear programming for supporting municipal solid waste management. The Nguyen's method was used to convert the fuzzy and fuzzy-stochastic linear programming problems into the conventional linear programs, by measuring the attainment values of fuzzy numbers and/or fuzzy random variables, as well as superiority and inferiority between triangular fuzzy numbers/triangular fuzzy-stochastic variables. The developed method can effectively tackle uncertainties described in terms of probability density functions, fuzzy membership functions, and discrete intervals. Moreover, the method can also improve upon the conventional interval fuzzy programming and two-stage stochastic programming approaches, with advantageous capabilities that are easily achieved with fewer constraints and significantly reduces consumption time. The developed model was applied to a case study of municipal solid waste management system in a city. The results indicated that reasonable solutions had been generated. The solution can help quantify the relationship between the change of system cost and the uncertainties, which could support further analysis of tradeoffs between the waste management cost and the system failure risk. Copyright © 2010 Elsevier Ltd. All rights reserved.

  19. A platform for population-based weight management: description of a health plan-based integrated systems approach.

    PubMed

    Pronk, Nicolaas P; Boucher, Jackie L; Gehling, Eve; Boyle, Raymond G; Jeffery, Robert W

    2002-10-01

    To describe an integrated, operational platform from which mail- and telephone-based health promotion programs are implemented and to specifically relate this approach to weight management programming in a managed care setting. In-depth description of essential systems structures, including people, computer technology, and decision-support protocols. The roles of support staff, counselors, a librarian, and a manager in delivering a weight management program are described. Information availability using computer technology is a critical component in making this system effective and is presented according to its architectural layout and design. Protocols support counselors and administrative support staff in decision making, and a detailed flowchart presents the layout of this part of the system. This platform is described in the context of a weight management program, and we present baseline characteristics of 1801 participants, their behaviors, self-reported medical conditions, and initial pattern of enrollment in the various treatment options. Considering the prevalence and upward trend of overweight and obesity in the United States, a need exists for robust intervention platforms that can systematically support multiple types of programs. Weight management interventions implemented using this platform are scalable to the population level and are sustainable over time despite the limits of defined resources and budgets. The present article describes an innovative approach to reaching a large population with effective programs in an integrated, coordinated, and systematic manner. This comprehensive, robust platform represents an example of how obesity prevention and treatment research may be translated into the applied setting.

  20. 38 CFR 52.180 - Administration of drugs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Administration of drugs... of drugs. The program management must assist with the management of medication and have a system for disseminating drug information to participants and program staff. (a) Procedures. (1) The program management...

  1. 38 CFR 52.180 - Administration of drugs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Administration of drugs... of drugs. The program management must assist with the management of medication and have a system for disseminating drug information to participants and program staff. (a) Procedures. (1) The program management...

  2. 38 CFR 52.180 - Administration of drugs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Administration of drugs... of drugs. The program management must assist with the management of medication and have a system for disseminating drug information to participants and program staff. (a) Procedures. (1) The program management...

  3. 38 CFR 52.180 - Administration of drugs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Administration of drugs... of drugs. The program management must assist with the management of medication and have a system for disseminating drug information to participants and program staff. (a) Procedures. (1) The program management...

  4. 38 CFR 52.180 - Administration of drugs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Administration of drugs... of drugs. The program management must assist with the management of medication and have a system for disseminating drug information to participants and program staff. (a) Procedures. (1) The program management...

  5. OSFA Goals and Objectives System: Strategies for Improved Program Planning and Management.

    ERIC Educational Resources Information Center

    Advanced Technology, Inc., Reston, VA.

    The purpose and function of the Goals and Objectives System of the U.S. Office of Student Financial Assistance (OSFA) are discussed. Results of a review of the system, policy issues, and a strategy for improving the system in OSFA program planning and management are also addressed. The system identifies a structure for work activities in OSFA and…

  6. Publications of the NASA Controlled Ecological Life Support Systems (CELSS) Program 1984-86

    NASA Technical Reports Server (NTRS)

    1987-01-01

    Publications of research sponsored by the NASA CELSS (Controlled Ecological Life Support Systems) Program are listed, along with publications of interest to the Program. The bibliography is divided into the three major divisions of CELSS research: (1) Food Production; (2) Waste Management; and (3) Systems Management and Control. This bibliography is an update of NASA CR-3911 and includes references from 1984 through 1986.

  7. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1990-01-01

    Archival reports on developments in programs managed by the JPL Office of Telecommunications and Data Acquisition (TDA) are provided. Topics covered include: DSN advanced systems (tracking and ground-based navigation; communications, spacecraft-ground; and station control and system technology) and DSN systems implementation (capabilities for existing projects; capabilities for new projects; TDA program management and analysis; and Goldstone solar system radar).

  8. 14 CFR 152.303 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...

  9. 14 CFR 152.303 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Financial management system. 152.303... (CONTINUED) AIRPORTS AIRPORT AID PROGRAM Accounting and Reporting Requirements § 152.303 Financial management system. Each sponsor or planning agency shall establish and maintain a financial management system that...

  10. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    NASA Technical Reports Server (NTRS)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  11. Program/Project Management of Sponsored Programs in a University Environment.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. Research Foundation.

    Management is a future-oriented decision process that relates resources into a total functional system for the accomplishment of a set of objectives. As a rule, universities do not have a management system, and there is no understanding of their environments in terms of the inputs, outputs, objectives, and organizational relationships of line and…

  12. Newly emerging resource efficiency manager programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolf, S.; Howell, C.

    1997-12-31

    Many facilities in the northwest such as K--12 schools, community colleges, and military installations are implementing resource-efficiency awareness programs. These programs are generally referred to as resource efficiency manager (REM) or resource conservation manager (RCM) programs. Resource efficiency management is a systems approach to managing a facility`s energy, water, and solid waste. Its aim is to reduce utility budgets by focusing on behavioral changes, maintenance and operation procedures, resource accounting, education and training, and a comprehensive awareness campaign that involves everyone in the organization.

  13. 41 CFR 102-33.140 - What are Flight Program Standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are Flight Program Standards? 102-33.140 Section 102-33.140 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33-MANAGEMENT OF...

  14. Tailoring Software for Multiple Processor Systems

    DTIC Science & Technology

    1982-10-01

    resource management decisions . Despite the lack of programming support, the use of multiple processor systems has grown sub- -stantially. Software has...making resource management decisions . Specifically, program- 1 mers need not allocate specific hardware resources to individual program components...Instead, such allocation decisions are automatically made based on high-level resource directives stated by ap- plication programmers, where each directive

  15. PMC's Florida Bay & Adjacent Marine Systems Science Program

    Science.gov Websites

    Florida Bay and Adjacent Marine Systems Science Program Inverted image, click link below to view actual image and caption click to display actual image and caption Program Overview Management & - January 2002 >For more, click here to view the What's New Page... | Main | Overview | Management &

  16. Feasibility of Executing MIMS on Interdata 80.

    DTIC Science & Technology

    CDC 6500 computers, CDC 6600 computers, MIMS(Medical Information Management System ), Medical information management system , File structures, Computer...storage managementThe report examines the feasibility of implementing large information management system on mini-computers. The Medical Information ... Management System and the Interdata 80 mini-computer were selected as being representative systems. The FORTRAN programs currently being used in MIMS

  17. The role of population monitoring in the management of North American waterfowl

    USGS Publications Warehouse

    Nichols, J.D.; Williams, B.K.; Johnson, F.A.

    2000-01-01

    Despite the effort and expense devoted to large-scale monitoring programs, few existing programs have been designed with specific objectives in mind and few permit strong inferences about the dynamics of monitored systems. The waterfowl population monitoring programs of the U.S. Fish and Wildlife Service, Canadian Wildlife Service and state and provincial agencies provide a nice example with respect to program objectives, design and implementation. The May Breeding Grounds Survey provides an estimate of system state (population size) that serves two primary purposes in the adaptive management process: identifying the appropriate time-specific management actions and updating the information state (model weights) by providing a basis for evaluating predictions of competing models. Other waterfowl monitoring programs (e.g., banding program, hunter questionnaire survey, parts collection survey, winter survey) provide estimates of vital rates (rates of survival, reproduction and movement) associated with system dynamics and variables associated with management objectives (e.g., harvest). The reliability of estimates resulting from monitoring programs depends strongly on whether considerations about spatial variation and detection probability have been adequately incorporated into program design and implementation. Certain waterfowl surveys again provide nice examples of monitoring programs that incorporate these considerations.

  18. A Case Study of Obsolescence Management Constraints During Development of Sustainment-Dominated Systems

    NASA Astrophysics Data System (ADS)

    Welch, Jonathan

    This case study focused on obsolescence management constraints that occur during development of sustainment-dominated systems. Obsolescence management constraints were explored in systems expected to last 20 years or more and that tend to use commercial off-the-shelf products. The field of obsolescence has received little study, but obsolescence has a large cost for military systems. Because developing complex systems takes an average of 3 to 8 years, and commercial off-the-shelf components are typically obsolete within 3 to 5 years, military systems are often deployed with obsolescence issues that are transferred to the sustainment community to determine solutions. The main problem addressed in the study was to identify the constraints that have caused 70% of military systems under development to be obsolete when they are delivered. The purpose of the study was to use a qualitative case study to identify constraints that interfered with obsolescence management occurring during the development stages of a program. The participants of this case study were managers, subordinates, and end-users who were logistics and obsolescence experts. Researchers largely agree that proactive obsolescence management is a lower cost solution for sustainment-dominated systems. Program managers must understand the constraints and understand the impact of not implementing proactive solutions early in the development program lifecycle. The conclusion of the study found several constraints that prevented the development program from early adoption of obsolescence management theories, specifically pro-active theories. There were three major themes identified: (a) management commitment, (b) lack of details in the statement of work, and (c) vendor management. Each major theme includes several subthemes. The recommendation is future researchers should explore two areas: (a) comparing the cost of managing obsolescence early in the development process versus the costs of managing later, (b) exploring the costs and value to start a centralized obsolescence group at each major defense contractor location.

  19. Shuttle Inventory Management

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Inventory Management System (SIMS) consists of series of integrated support programs providing supply support for both Shuttle program and Kennedy Space Center base opeations SIMS controls all supply activities and requirements from single point. Programs written in COBOL.

  20. 41 CFR 128-1.8009 - Review of Seismic Safety Program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Review of Seismic Safety Program. 128-1.8009 Section 128-1.8009 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF JUSTICE 1-INTRODUCTION 1.80-Seismic Safety Program...

  1. 77 FR 19408 - Dynamic Mobility Applications and Data Capture Management Programs; Notice of Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... DEPARTMENT OF TRANSPORTATION Dynamic Mobility Applications and Data Capture Management Programs...) Intelligent Transportation System Joint Program Office (ITS JPO) will host a free public meeting to provide stakeholders an update on the Data Capture and Management (DCM) and Dynamic Mobility Applications (DMA...

  2. The Denver region traffic signal system improvement program : planning for management and operations

    DOT National Transportation Integrated Search

    2009-04-01

    The Denver Regional Council of Governments (DRCOG) works with over 30 local jurisdictions on the Traffic Signal System Improvement Program (TSSIP), a combination of management and operations strategies designed to time and coordinate traffic signals ...

  3. Design and utilization of a Flight Test Engineering Database Management System at the NASA Dryden Flight Research Facility

    NASA Technical Reports Server (NTRS)

    Knighton, Donna L.

    1992-01-01

    A Flight Test Engineering Database Management System (FTE DBMS) was designed and implemented at the NASA Dryden Flight Research Facility. The X-29 Forward Swept Wing Advanced Technology Demonstrator flight research program was chosen for the initial system development and implementation. The FTE DBMS greatly assisted in planning and 'mass production' card preparation for an accelerated X-29 research program. Improved Test Plan tracking and maneuver management for a high flight-rate program were proven, and flight rates of up to three flights per day, two times per week were maintained.

  4. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  5. Dynamic analysis for solid waste management systems: an inexact multistage integer programming approach.

    PubMed

    Li, Yongping; Huang, Guohe

    2009-03-01

    In this study, a dynamic analysis approach based on an inexact multistage integer programming (IMIP) model is developed for supporting municipal solid waste (MSW) management under uncertainty. Techniques of interval-parameter programming and multistage stochastic programming are incorporated within an integer-programming framework. The developed IMIP can deal with uncertainties expressed as probability distributions and interval numbers, and can reflect the dynamics in terms of decisions for waste-flow allocation and facility-capacity expansion over a multistage context. Moreover, the IMIP can be used for analyzing various policy scenarios that are associated with different levels of economic consequences. The developed method is applied to a case study of long-term waste-management planning. The results indicate that reasonable solutions have been generated for binary and continuous variables. They can help generate desired decisions of system-capacity expansion and waste-flow allocation with a minimized system cost and maximized system reliability.

  6. U.S. Army Corps of Engineers Manpower Information System: An Integrated Approach to Manpower Management

    DTIC Science & Technology

    1994-04-01

    engineering and con- struction management services for both military and civil works programs. In FY93, the cost of those programs exceeded $10 billion and...A related issue was to explore the USACE costs , benefits, and barriers to implementing a single Class VI system software package for both the military...provide information in useful ways, track utilization information, I A Class HI system is defined in AR 25-3. It is a system whose total program costs are

  7. Assessment of Army Contracting Command’s Contract Management Processes (TACOM and RDECOM)

    DTIC Science & Technology

    2011-04-01

    Management Processes (TACOM and RDECOM)” was prepared for and funded by the Acquisition Program, Graduate School of Business & Public Policy, Naval...system and the Evolved Expendable Launch Vehicle rocket program. Rendon has taught contract management courses for the UCLA Government Contracts...program; he was also a senior faculty member for the Keller Graduate School of Management, where he taught MBA courses in project management and

  8. 41 CFR 301-73.2 - What are our responsibilities as participants in the Federal travel management program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What are our responsibilities as participants in the Federal travel management program? 301-73.2 Section 301-73.2 Public Contracts and Property Management Federal Travel Regulation System TEMPORARY DUTY (TDY) TRAVEL ALLOWANCES AGENCY RESPONSIBILITIES 73-TRAVEL PROGRAMS...

  9. 40 CFR 30.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Standards for financial management... Program Management § 30.21 Standards for financial management systems. (a) EPA shall require recipients to...) Recipients' financial management systems shall provide for the following. (1) Accurate, current and complete...

  10. 32 CFR 34.11 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Standards for financial management systems. 34... ORGANIZATIONS Post-award Requirements Financial and Program Management § 34.11 Standards for financial management systems. (a) Recipients shall be allowed and encouraged to use existing financial management...

  11. Design and implementation of an integrated, continuous evaluation, and quality improvement system for a state-based home-visiting program.

    PubMed

    McCabe, Bridget K; Potash, Dru; Omohundro, Ellen; Taylor, Cathy R

    2012-10-01

    To describe the design and implementation of an evaluation system to facilitate continuous quality improvement (CQI) and scientific evaluation in a statewide home visiting program, and to provide a summary of the system's progress in meeting intended outputs and short-term outcomes. Help Us Grow Successfully (HUGS) is a statewide home visiting program that provides services to at-risk pregnant/post-partum women, children (0-5 years), and their families. The program goals are to improve parenting skills and connect families to needed services and thus improve the health of the service population. The evaluation system is designed to: (1) integrate evaluation into daily workflow; (2) utilize standardized screening and evaluation tools; (3) facilitate a culture of CQI in program management; and, (4) facilitate scientifically rigorous evaluations. The review of the system's design and implementation occurred through a formative evaluation process (reach, dose, and fidelity). Data was collected through electronic and paper surveys, administrative data, and notes from management meetings, and medical chart review. In the design phase, four process and forty outcome measures were selected and are tracked using standardized screening and monitoring tools. During implementation, the reach and dose of training were adequate to successfully launch the evaluation/CQI system. All staff (n = 165) use the system for management of families; the supervisors (n = 18) use the system to track routine program activities. Data quality and availability is sufficient to support periodic program reviews at the region and state level. In the first 7 months, the HUGS evaluation system tracked 3,794 families (7,937 individuals). System use and acceptance is high. A successful implementation of a structured evaluation system with a strong CQI component is feasible in an existing, large statewide program. The evaluation/CQI system is an effective mechanism to drive modest change in management of the program.

  12. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  13. An Analysis of the Future Combat Systems (FCS) Spin Out 1 Low-Rate of Initial Production (LRIP) Contract

    DTIC Science & Technology

    2009-08-24

    interests are strategic resource management, strategic control, and corporate financial reporting. Joseph G. San Miguel Professor Graduate School of...Officer PM – Program Manager SAIC – Science Applications International Corporation SAP – Systems Applications and Products SDD – System Development and...the award of the multi-billion dollar FCS program management contract to the Boeing Company and Science Applications International Corporation (SAIC

  14. NASIS data base management system: IBM 360 TSS implementation. Volume 1: Installation standards

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The installation standards for the (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlines. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficency of the programming task.

  15. 41 CFR 101-26.501-2 - Standardized buying programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.501-2 Standardized buying programs. Wherever... school age passenger. (4) Sedans and station wagons (based on standardized, consolidated requirements...

  16. Medication therapy disease management: Geisinger's approach to population health management.

    PubMed

    Jones, Laney K; Greskovic, Gerard; Grassi, Dante M; Graham, Jove; Sun, Haiyan; Gionfriddo, Michael R; Murray, Michael F; Manickam, Kandamurugu; Nathanson, Douglas C; Wright, Eric A; Evans, Michael A

    2017-09-15

    Pharmacists' involvement in a population health initiative focused on chronic disease management is described. Geisinger Health System has cultivated a culture of innovation in population health management, as highlighted by its ambulatory care pharmacy program, the Medication Therapy Disease Management (MTDM) program. Initiated in 1996, the MTDM program leverages pharmacists' pharmacotherapy expertise to optimize care and improve outcomes. MTDM program pharmacists are trained and credentialed to manage over 16 conditions, including atrial fibrillation (AF) and multiple sclerosis (MS). Over a 15-year period, Geisinger Health Plan (GHP)-insured patients with AF whose warfarin therapy was managed by the MTDM program had, on average, 18% fewer emergency department (ED) visits and 18% fewer hospitalizations per year than GHP enrollees with AF who did not receive MTDM services, with 23% lower annual total care costs. Over a 2-year period, GHP-insured patients with MS whose pharmacotherapy was managed by pharmacists averaged 28% fewer annual ED visits than non-pharmacist-managed patients; however, the mean annual total care cost was 21% higher among MTDM clinic patients. The Geisinger MTDM program has evolved over 20 years from a single pharmacist-run anticoagulation clinic into a large program focused on managing the health of an ever-growing population. Initial challenges in integrating pharmacists into the Geisinger patient care framework as clinical experts were overcome by demonstrating the MTDM program's positive impact on patient outcomes. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  17. Why Army Program Managers Struggle As Life Cycle Managers: A Study of the PM’s Roles, Responsibilities, and Barriers In the Execution of Operations and Support

    DTIC Science & Technology

    2016-09-01

    Support Strategies (PBPSS), throughout the system life cycle .  Maximizing competition, to include small business participation.  Developing...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT WHY ARMY PROGRAM MANAGERS STRUGGLE AS LIFE CYCLE MANAGERS...SUBTITLE WHY ARMY PROGRAM MANAGERS STRUGGLE AS LIFE CYCLE MANAGERS: A STUDY OF THE PM’S ROLES, RESPONSIBILITIES, AND BARRIERS IN THE EXECUTION OF

  18. Spacelab software development and integration concepts study report. Volume 2: Appendices

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Software considerations were developed for incorporation in the spacelab systems design, and include management concepts for top-down structured programming, composite designs for modular programs, and team management methods for production programming.

  19. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  20. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  1. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  2. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  3. 24 CFR 7.13 - Responsibilities of the Assistant Secretary for Administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    .... The Assistant Secretary for Administration shall: (a) Provide leadership in developing and maintaining personnel management policies, programs, automated systems, and procedures that will promote and ensure... the personnel management policies, programs, automated systems, and EEO procedures; (c) Participate at...

  4. A management system for evaluating the Virginia periodic motor vehicle inspection program.

    DOT National Transportation Integrated Search

    1977-01-01

    A system for management evaluation of Virginia's periodic motor vehicle inspection (PMVI) program was developed which is similar to that currently in use by the Virginia Department of State Police, except for changes in the sample size of inspection ...

  5. NASIS data base management system - IBM 360/370 OS MVT implementation. 1: Installation standards

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The installation standards for the NASA Aerospace Safety Information System (NASIS) data base management system are presented. The standard approach to preparing systems documentation and the program design and coding rules and conventions are outlined. Included are instructions for preparing all major specifications and suggestions for improving the quality and efficiency of the programming task.

  6. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  7. [Characteristics of case management programs and their potential for patient empowerment].

    PubMed

    Grün, Oskar; Maier, Manfred

    2008-01-01

    Different types of case management programs have been increasingly developed for health care systems. This study, therefore, aimed to identify similarities and differences of case management programs, to estimate their shaping with special emphasis on patient empowerment, and to develop an instrument for their differentiation. During an interdisciplinary seminar for students, eight different case management programs were selected and analyzed. Five characteristics of case management programs were identified: type of case, extent of functions, players involved, limits of availability and need for resources. The programs were categorized into information-, provider-, disease- or patient centred. With these characteristics the selected programs could be exactly described and their potential for patient empowerment could be assessed. This newly developed tool for describing case management programs allows for their sufficient differentiation. The potential for patient empowerment apparently is most prominent in patient centred programs.

  8. 7 CFR 277.6 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Standards for financial management systems. 277.6... ADMINISTRATIVE COSTS OF STATE AGENCIES § 277.6 Standards for financial management systems. (a) General. This section prescribes standards for financial management systems in administering program funds by the State...

  9. 7 CFR 277.6 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Standards for financial management systems. 277.6... ADMINISTRATIVE COSTS OF STATE AGENCIES § 277.6 Standards for financial management systems. (a) General. This section prescribes standards for financial management systems in administering program funds by the State...

  10. Lessons Learned from the Development and Implementation of a Knowledge Management Program for the Naval Sea Systems Command

    DTIC Science & Technology

    2017-03-01

    ABSTRACT (maximum 200 words) This study applied knowledge management (KM) theories and principles to develop and implement a KM program for the... principles to develop and implement a KM program for the Naval Sea Systems Command (NAVSEA) that strengthens the workforce’s understanding of the...23 C. EXECUTION AND SUSTAINMENT .............................................. 24 1. Marketing

  11. The Program Manager’s Support System (PMSS). An Executive Overview and System Description,

    DTIC Science & Technology

    1987-01-01

    process. The PMSS tool will, when completed, support the program management process in all stages of program nanagement; that is, birth of the...module, developed as a template on LOTUS 1-2-3, is an application of the Constructive Cost Model (COCOMO) developed by B. Boehm. The DSMC SWCE module, a...developed for a specific program office but can be modified for use by others. It is a "template" system designed to operate on a Zenith Z-150 using Lotus 1

  12. 7 CFR 247.34 - Management reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Management reviews. 247.34 Section 247.34 Agriculture... CHILD NUTRITION PROGRAMS COMMODITY SUPPLEMENTAL FOOD PROGRAM § 247.34 Management reviews. (a) What must... agency must establish a management review system to ensure that local agencies, subdistributing agencies...

  13. 7 CFR 2610.2 - Headquarters organization.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Management (AIG/PD&RM) formulates OIG policies and procedures; develops, administers and directs comprehensive programs for the management, budget, financial, personnel, systems improvement, and information... information management systems. The staff maintains OIG's directives system; Departmental Regulations and...

  14. 20 CFR 632.125 - Responsibilities of Native American grantees, subgrantees and contractors for preventing fraud...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... management information system in accordance with the requirements of § 632.32. (c) Any person having..., subgrantees and contractors for preventing fraud and program abuse and for general program management. 632.125... and for general program management. (a) Each Native American grantee shall establish and use internal...

  15. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... program manager must establish and use an adequate system to schedule and release program aircraft. (b) Except as provided in paragraph (d) of this section, each program manager must have adequate procedures... manager with at least the information required to be included in a VFR flight plan; (2) Provide for timely...

  16. 75 FR 20526 - Fisheries of the Exclusive Economic Zone Off Alaska; Individual Fishing Quota Program; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... the Halibut Act. The IFQ Program's principal management measures, with certain exceptions, were: to... Conservation and Management Act (Magnuson-Stevens Act), and other applicable law. DATES: Effective April 20...: Background The IFQ Program, a limited access management system for the fixed gear Pacific halibut...

  17. NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad

    2012-12-31

    The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department ofmore » Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following topics in the primary five-day Building Energy/Sustainability Management Certificate program in five training modules, namely: 1) Strategic Planning, 2) Sustainability Audits, 3) Information Analysis, 4) Energy Efficiency, and 5) Communication. Training Program 2 addresses the following technical topics in the two-day Building Technologies workshop: 1) Energy Efficient Building Materials, 2) Green Roofing Systems, 3) Energy Efficient Lighting Systems, 4) Alternative Power Systems for Buildings, 5) Innovative Building Systems, and 6) Application of Building Performance Simulation Software. Program 3 is a seminar which provides an overview of elements of programs 1 and 2 in a seminar style presentation designed for the general public to raise overall public awareness of energy and sustainability topics.« less

  18. KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Manager of the Thermal Protection System (TPS) Facility Martin Wilson (right) briefs NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) on the properties of a thermal blanket used in the Shuttle's TPS. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

    NASA Image and Video Library

    2003-12-19

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Manager of the Thermal Protection System (TPS) Facility Martin Wilson (right) briefs NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) on the properties of a thermal blanket used in the Shuttle's TPS. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.

  19. SSCR Automated Manager (SAM) release 1. 1 reference manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-10-01

    This manual provides instructions for using the SSCR Automated Manager (SAM) to manage System Software Change Records (SSCRs) online. SSCRs are forms required to document all system software changes for the Martin Marietta Energy Systems, Inc., Central computer systems. SAM, a program developed at Energy Systems, is accessed through IDMS/R (Integrated Database Management System) on an IBM system.

  20. Feedback Improvement in Automatic Program Evaluation Systems

    ERIC Educational Resources Information Center

    Skupas, Bronius

    2010-01-01

    Automatic program evaluation is a way to assess source program files. These techniques are used in learning management environments, programming exams and contest systems. However, use of automated program evaluation encounters problems: some evaluations are not clear for the students and the system messages do not show reasons for lost points.…

  1. Concurrent Engineering Teams. Volume 2: Annotated Bibliography

    DTIC Science & Technology

    1990-11-01

    publishles. They normally embody restilts of major projects which (a) have a direct bearing am decisionse affecting major program , III) addrnss...D., "What Processes do You Own? How are They Doing?," Program Manager, Journal of the Defense Systems Management College, September-October 1989, pp...216. The key ingredient to any successful TQM program is top management commitment and involvement. The early top management involvement reflects

  2. 42 CFR 456.700 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ASSISTANCE PROGRAMS UTILIZATION CONTROL Drug Use Review (DUR) Program and Electronic Claims Management System... optional point-of-sale electronic claims management system for processing claims for covered outpatient... 42 Public Health 4 2014-10-01 2014-10-01 false Scope. 456.700 Section 456.700 Public Health...

  3. 7 CFR 249.11 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Financial management system. 249.11 Section 249.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions...

  4. 7 CFR 249.11 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Financial management system. 249.11 Section 249.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions...

  5. 7 CFR 248.11 - Financial management system.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Financial management system. 248.11 Section 248.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions...

  6. 7 CFR 249.11 - Financial management system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Financial management system. 249.11 Section 249.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions...

  7. 7 CFR 248.11 - Financial management system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Financial management system. 248.11 Section 248.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions...

  8. 7 CFR 248.11 - Financial management system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Financial management system. 248.11 Section 248.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions...

  9. 7 CFR 248.11 - Financial management system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Financial management system. 248.11 Section 248.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions...

  10. 7 CFR 248.11 - Financial management system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Financial management system. 248.11 Section 248.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS WIC FARMERS' MARKET NUTRITION PROGRAM (FMNP) State Agency Provisions...

  11. 7 CFR 249.11 - Financial management system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Financial management system. 249.11 Section 249.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions...

  12. 7 CFR 249.11 - Financial management system.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Financial management system. 249.11 Section 249.11 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS SENIOR FARMERS' MARKET NUTRITION PROGRAM (SFMNP) State Agency Provisions...

  13. A Data-Based Financial Management Information System (FMIS) for Administrative Sciences Department

    DTIC Science & Technology

    1990-12-01

    Financial Management Information System that would result in improved management of financial assets, better use of clerical skills, and more detailed...develops and implements a personal computer-based Management Information System for the Management of the many funding accounts controlled by the...different software programs, into a single all-encompassing Management Information System . The system was written using dBASE IV and is currently operational.

  14. Manpower management information system /MIS/

    NASA Technical Reports Server (NTRS)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  15. Exploratory technology research program for electrochemical energy storage

    NASA Astrophysics Data System (ADS)

    Kinoshita, K.

    1992-06-01

    The U.S. Department of Energy's Office of Propulsion Systems provides support for an electrochemical energy storage program, that includes research and development (R&D) on advanced rechargeable batteries and fuel cells. A major goal of this program is to develop electrochemical power sources suitable for application in electric vehicles. The program centers on advanced systems that offer the potential for high performance and low life-cycle costs. The DOE Electrochemical Energy Storage Program is divided into two projects: the Electric Vehicle Advanced Battery Systems Development (EVABS) Program and the Exploratory Technology Research (ETR) Program. The EVABS Program management responsibility has been assigned to Sandia National Laboratory, and the Lawrence Berkeley Laboratory is responsible for management of the ETR Program. The EVABS and ETR Programs include an integrated matrix of R&D efforts designed to advance progress on several candidate electrochemical systems. The United States Advanced Battery Consortium (USABC), a tripartite undertaking between DOE, the U.S. automobile manufacturers and the Electric Power Research Institute (EPRI), was formed in 1991 to accelerate the development of advanced batteries for consumer EVs. The role of the ETR Program is to perform supporting research on the advanced battery systems under development by the USABC and EVABS Program, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the ETR Program is to identify the most promising electrochemical technologies and transfer them to the USABC, the battery industry and/or the EVABS Program for further development and scaleup. This report summarizes the research, financial and management activities relevant to the ETR Program in FY 1991.

  16. Rising out-of-pocket costs in disease management programs.

    PubMed

    Chernew, Michael E; Rosen, Allison B; Fendrick, A Mark

    2006-03-01

    To document the rise in copayments for patients in disease management programs and to call attention to the inherent conflicts that exist between these 2 approaches to benefit design. Data from 2 large health plans were used to compare cost sharing in disease management programs with cost sharing outside of disease management programs. The copayments charged to participants in disease management programs usually do not differ substantially from those charged to other beneficiaries. Cost sharing and disease management result in conflicting approaches to benefit design. Increasing copayments may lead to underuse of recommended services, thereby decreasing the clinical effectiveness and increasing the overall costs of disease management programs. Policymakers and private purchasers should consider the use of targeted benefit designs when implementing disease management programs or redesigning cost-sharing provisions. Current information systems and health services research are sufficiently advanced to permit these benefit designs.

  17. Civilian Agency Industry Working Group EVM World Update

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald

    2013-01-01

    Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.

  18. 41 CFR 102-194.40 - For what Standard or Optional forms should an electronic version not be made available?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false For what Standard or... Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS 194-STANDARD AND OPTIONAL FORMS MANAGEMENT PROGRAM § 102-194.40...

  19. Program Manager: Journal of the Defense Systems Management College. Volume 18. Number 6, November-December 1989

    DTIC Science & Technology

    1989-12-01

    program manager was evaluated managers in group one will group two, the "less or no sports at all" by at least one additional rater ). In ad- have... determined that for the 34 evaluating the differences between subhypothesis is based on its respective managers, the total number of years group means, each...things like education, experience, age, sex , personality, in- formed within the context of Air Force program managers dividual values, and a specific

  20. 20 CFR 435.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.21 Standards for financial management systems. (a) Introduction. SSA requires recipients to relate financial... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Standards for financial management systems...

  1. Financial Management in the Strategic Systems Project Office.

    DTIC Science & Technology

    SSPO, the largest program office in the Navy and in existence for over 20 years, has perfected time tested financial management procedures which may...serve as a model for the student of program management. This report presents an overview of the SSPO financial management concepts and general

  2. Transportation engineering project management : survey of practice.

    DOT National Transportation Integrated Search

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  3. The Design and Implementation of a Management Information System to Facilitate the Functioning of a CBTE Program.

    ERIC Educational Resources Information Center

    Neuhauser, Charlotte

    The Vocational and Applied Arts (VAE) Management Information System (MIS) is designed to select, store, process, and transmit information needed in a competency-based teacher education (CBTE) program. The system is computerized and is composed of six subsystems which deal with admissions, class scheduling, faculty loads, instruction, field…

  4. Tree fruit IPM programs in the Western United States: the challenge of enhancing biological control through intensive management

    USDA-ARS?s Scientific Manuscript database

    The work of Stern and colleagues on integrated control has had long-lasting effects on development of IPM programs in orchard systems. Management systems based solely on pesticides have proven to be unstable, and the success of IPM systems in orchards has been driven by the conservation of natural ...

  5. Costing and Data Management. Development of a Simplified System for Smaller Colleges and Universities

    ERIC Educational Resources Information Center

    Ames, Michael D.

    1976-01-01

    A participatory process by which a useful costing and data management system was developed at Chapman College is described. The system summarizes information on instructional workloads, class sizes, and the costs per student credit hour for academic programs. Costs incurred in other areas to support each program are included. (Editor/LBH)

  6. 48 CFR 519.7014 - Internal controls.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Internal controls. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7014 Internal controls. (a) The GSA Mentor-Protégé Program Manager will manage the Program. Internal controls will be established by...

  7. 48 CFR 519.7014 - Internal controls.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Internal controls. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7014 Internal controls. (a) The GSA Mentor-Protégé Program Manager will manage the Program. Internal controls will be established by...

  8. 48 CFR 519.7014 - Internal controls.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Internal controls. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7014 Internal controls. (a) The GSA Mentor-Protégé Program Manager will manage the Program. Internal controls will be established by...

  9. 48 CFR 519.7014 - Internal controls.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Internal controls. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7014 Internal controls. (a) The GSA Mentor-Protégé Program Manager will manage the Program. Internal controls will be established by...

  10. 48 CFR 519.7014 - Internal controls.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Internal controls. 519... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7014 Internal controls. (a) The GSA Mentor-Protégé Program Manager will manage the Program. Internal controls will be established by...

  11. Translating Addictions Research into Evidence-based Practice: the Polaris CD Outcomes Management System

    PubMed Central

    Toche-Manley, L.; Grissom, G.; Dietzen, L.; Sangsland, S.

    2011-01-01

    Converting the findings from addictions studies into information actionable by (non-research) treatment programs is important to improving program outcomes. This paper describes the translation of the findings of studies on Patient-Services matching, prediction of patient response to treatment (Expected Treatment Response) and prediction of dropout to provide evidence-based decision support in routine treatment. The findings of the studies and their application to the development of an outcomes management system are described. Implementation issues in a network of addictions treatment programs are discussed. The work illustrates how outcomes management systems can play an important role in translating research into practice. PMID:21324606

  12. An Analysis of Program Managers as Total Life Cycle Systems Managers

    DTIC Science & Technology

    2017-09-01

    S) AND ADDRESS(ES) N/A 10. SPONSORING / MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of...Total Life Cycle Systems Management (TLCSM) is a term used in Army Regulation ( AR ) 70-1 to describe the responsibility of the Army Program Manager (PM...away from the PM. However, other Army guidance challenges AR 70-1 when transitioning to the Operations and Support phase of the acquisition life

  13. An Agent-Based Cockpit Task Management System

    NASA Technical Reports Server (NTRS)

    Funk, Ken

    1997-01-01

    An agent-based program to facilitate Cockpit Task Management (CTM) in commercial transport aircraft is developed and evaluated. The agent-based program called the AgendaManager (AMgr) is described and evaluated in a part-task simulator study using airline pilots.

  14. 48 CFR 719.273-8 - Developmental assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... 719.273-8 Section 719.273-8 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The U.S. Agency for International Development... relating to— (1) Financial management; (2) Organizational management; (3) Overall business management...

  15. Detailed requirements document for common software of shuttle program information management system

    NASA Technical Reports Server (NTRS)

    Everette, J. M.; Bradfield, L. D.; Horton, C. L.

    1975-01-01

    Common software was investigated as a method for minimizing development and maintenance cost of the shuttle program information management system (SPIMS) applications while reducing the time-frame of their development. Those requirements satisfying these criteria are presented along with the stand-alone modules which may be used directly by applications. The SPIMS applications operating on the CYBER 74 computer, are specialized information management systems which use System 2000 as a data base manager. Common software provides the features to support user interactions on a CRT terminal using form input and command response capabilities. These features are available as subroutines to the applications.

  16. Reliability Analysis of RSG-GAS Primary Cooling System to Support Aging Management Program

    NASA Astrophysics Data System (ADS)

    Deswandri; Subekti, M.; Sunaryo, Geni Rina

    2018-02-01

    Multipurpose Research Reactor G.A. Siwabessy (RSG-GAS) which has been operating since 1987 is one of the main facilities on supporting research, development and application of nuclear energy programs in BATAN. Until now, the RSG-GAS research reactor has been successfully operated safely and securely. However, because it has been operating for nearly 30 years, the structures, systems and components (SSCs) from the reactor would have started experiencing an aging phase. The process of aging certainly causes a decrease in reliability and safe performances of the reactor, therefore the aging management program is needed to resolve the issues. One of the programs in the aging management is to evaluate the safety and reliability of the system and also screening the critical components to be managed.One method that can be used for such purposes is the Fault Tree Analysis (FTA). In this papers FTA method is used to screening the critical components in the RSG-GAS Primary Cooling System. The evaluation results showed that the primary isolation valves are the basic events which are dominant against the system failure.

  17. Automatic Management of Parallel and Distributed System Resources

    NASA Technical Reports Server (NTRS)

    Yan, Jerry; Ngai, Tin Fook; Lundstrom, Stephen F.

    1990-01-01

    Viewgraphs on automatic management of parallel and distributed system resources are presented. Topics covered include: parallel applications; intelligent management of multiprocessing systems; performance evaluation of parallel architecture; dynamic concurrent programs; compiler-directed system approach; lattice gaseous cellular automata; and sparse matrix Cholesky factorization.

  18. Development and Implementation of a Comprehensive Risk Management Program at the USAF Academy Hospital.

    DTIC Science & Technology

    1980-04-01

    much less con - cerned about malpractice problems. As a result of the program, they began to view the risk management program as their own and to recog...that con - tributes to better patient care. 131 Implementing Risk Management According to Donovan and Bader, an action plan for the systems approach might...Al87 344 DEVELOPMENT AND IMPLEMENTATION OF A COMPREHENSIVE RISK 1 MANAGEMENT PROGRAM AT THE USAF ACADEMY HOSPITAL(U) ARMY HEALTH CARE STUDIES AND

  19. 23 CFR 973.210 - Indian lands bridge management system (BMS).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Indian lands bridge management system (BMS). 973.210... PROGRAM Bureau of Indian Affairs Management Systems § 973.210 Indian lands bridge management system (BMS...: (a) The BIA shall have a nationwide BMS for the federally and tribally owned IRR bridges that are...

  20. Program Manager: Journal of the Defense Systems Management College. Volume 17, Number 1, January-February 1988,

    DTIC Science & Technology

    1988-02-01

    vendors 1 over government usurpation of their proprietary data rights. It is not ap- parent what effect, if any, this acquisi- tion strategy would have at...relative to what it would have cost Codevelopment Programs 0 Review of this material does not in:- each user to develop the item separate- Recent...codevelopment Codevelopment programs have had mixed results. The Programs Leading Multiple Launch Rocket System in- To Production Competition volving the

  1. Underground storage tank management plan, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Underground Storage Tank (UST) Program at the Oak Ridge Y-12 Plant was established to locate UST systems at the facility and to ensure that all operating UST systems are free of leaks. UST systems have been removed or upgraded in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance. With the closure of a significant portion of the USTs, the continuing mission of the UST Management Program is to manage the remaining active UST systems and continue corrective actions in a safe regulatory compliant manner. This Program outlines the compliance issues that must be addressed, reviewsmore » the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Program provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. The plan is divided into three major sections: (1) regulatory requirements, (2) active UST sites, and (3) out-of-service UST sites. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Program, and the procedures and guidance for compliance.« less

  2. Computerized commodity management system in Thailand and Brazil.

    PubMed

    1984-01-01

    Thailand's National Family Planning Program is testing a computerized contraceptive commodity reporting management in 4 provinces with 104 National Family Planning Program (NFPP) reporting entities. Staff in the Brazilian Association of Family Planning Entities (ABEPF) and CPAIMC, a major family planning service agency, have been trained in the use of a computerized commodity distribution management system and are ready to initiate test use. The systems were designed in response to specific commodity management needs of the concerned organizations. Neither distribution program functions as a contraceptive social marketing (CSM) program, but each system reviewed has aspects that are relevant to CSM commodity management needs. Both the Thai and Brazilian systems were designed to be as automatic and user friendly as possible. Both have 3 main databases and perform similar management and reporting functions. Differing program configurations and basic data forms reflect the specific purposes of each system. Databases for the logistics monitoring system in Thailand arethe reporting entity (or ID) file; the current month's data file; and the master balance file. The data source is the basic reporting form that also serves as a Request and Issue Voucher for commodities. Editing functions in the program check to see that the current "beginning balance" equals the previous month's ending balance. Indexing functions in the system allow direct access to the records of any reporting entity via the ID number, as well as the sequential processing of records by ID number. 6 reports can be generated: status report by issuing entity; status report by dispensing entity; aggregate status report; out of compliance products report; out of compliance outlets report; and suggested shipment to regional warehouse report. Databases for the distribution management system in Brazil are: the name-ID (client institution) file; the product file; and the data file. The data source is an order form that contains a client code similar to the code used in Thailand. An interrogative data entry program enhances the management function of the system. 8 reports can be individually issued: a status report on back orders by product; a status report on back orders by institution and product; a historical report of year to date shipments and value by product; a historical report of year to date shipments by client and product; year to date payment reports from each client; outstanding invoices by month for the previous 12 months; a product report showing the amount of each product or order with outstanding invoices; and a stock position report.

  3. 22 CFR 226.21 - Standards for financial management systems.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Standards for financial management systems. 226... AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Financial and Program Management § 226.21 Standards for financial management systems. (a) Recipients shall relate financial data to...

  4. 36 CFR 1210.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Program Management § 1210.21 Standards for financial management systems. (a) The NHPRC shall require.... (b) Recipients' financial management systems shall provide for the following. (1) Accurate, current... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Standards for financial...

  5. 38 CFR 49.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Program Management § 49.21 Standards for financial management systems. (a) Federal awarding agencies shall... practical. (b) Recipients' financial management systems shall provide for the following. (1) Accurate... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Standards for financial...

  6. 22 CFR 518.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Standards for financial management systems. 518... ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.21 Standards for financial management systems. (a) Federal awarding agencies shall require recipients to relate financial data to...

  7. 45 CFR 2543.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Standards for financial management systems. 2543... OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.21 Standards for financial management systems. (a) Federal awarding agencies shall require recipients to relate...

  8. 34 CFR 74.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Standards for financial management systems. 74.21... Requirements Financial and Program Management § 74.21 Standards for financial management systems. (a) Recipients shall relate financial data to performance data and develop unit cost information whenever...

  9. 41 CFR 101-26.501-9 - Centralized motor vehicle leasing program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Centralized motor vehicle leasing program. 101-26.501-9 Section 101-26.501-9 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26...

  10. 41 CFR 102-33.155 - How must we establish Flight Program Standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How must we establish Flight Program Standards? 102-33.155 Section 102-33.155 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 33...

  11. 40 CFR 68.15 - Management.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Management. 68.15 Section 68.15... ACCIDENT PREVENTION PROVISIONS General § 68.15 Management. (a) The owner or operator of a stationary source with processes subject to Program 2 or Program 3 shall develop a management system to oversee the...

  12. 40 CFR 68.15 - Management.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Management. 68.15 Section 68.15... ACCIDENT PREVENTION PROVISIONS General § 68.15 Management. (a) The owner or operator of a stationary source with processes subject to Program 2 or Program 3 shall develop a management system to oversee the...

  13. 40 CFR 68.15 - Management.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Management. 68.15 Section 68.15... ACCIDENT PREVENTION PROVISIONS General § 68.15 Management. (a) The owner or operator of a stationary source with processes subject to Program 2 or Program 3 shall develop a management system to oversee the...

  14. 40 CFR 68.15 - Management.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Management. 68.15 Section 68.15... ACCIDENT PREVENTION PROVISIONS General § 68.15 Management. (a) The owner or operator of a stationary source with processes subject to Program 2 or Program 3 shall develop a management system to oversee the...

  15. 41 CFR 102-194.25 - What is an automated Standard or Optional format?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS 194-STANDARD AND OPTIONAL FORMS MANAGEMENT PROGRAM § 102-194.25 What is an automated Standard or... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What is an automated...

  16. 40 CFR 68.15 - Management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Management. 68.15 Section 68.15... ACCIDENT PREVENTION PROVISIONS General § 68.15 Management. (a) The owner or operator of a stationary source with processes subject to Program 2 or Program 3 shall develop a management system to oversee the...

  17. 75 FR 35092 - Submission for Review: Program Services Evaluation Surveys, OMB Control No. 3206-NEW

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Management (OPM) leads Federal agencies in shaping human resources management systems to effectively recruit... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Program Services Evaluation Surveys, OMB Control No. 3206-NEW AGENCY: U.S. Office of Personnel Management. ACTION: 60-Day Notice and request for...

  18. An Empirical Investigation of USAF Logistics Readiness Officer Mission Sets

    DTIC Science & Technology

    2013-03-01

    parts, engine repair and 7 spare utilization, fuel cell and fuel system related repairs, heavy maintenance and inspection functions, and aircraft...provide additional mission sets. Fuels Management, Program Management, Acquisitions Management, and Depot Maintenance were suggested once each as...being mentioned by 2.5 percent ( Fuels Management, Program Management, Acquisitions Management, and Depot Maintenance) and 5 percent (Human Capital

  19. Health Care Financing Administration--Medicaid program; Medicaid management information systems. Final rule.

    PubMed

    1980-03-05

    These regulations set forth a new procedure to improve Medicaid management by explicitly authorizing HCFA to expand or revise State Medicaid Management Information Systems (MMIS) as necessary to meet program needs. Under this procedure, HCFA will publish major new requirements for comment before deciding to adopt them, and will provide increased Federal matching and reasonable phase-in time for their implementation. HCFA will also periodically review ongoing systems to determine whether all system requirements and performance standards are being met and may reduce the level of Federal matching for those MMIS systems which do not meet prescribed standards.

  20. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  1. NASA Lewis Research Center low-gravity fluid management technology program

    NASA Technical Reports Server (NTRS)

    Aydelott, J. C.; Carney, M. J.; Hochstein, J. I.

    1985-01-01

    A history of the Lewis Research Center in space fluid management technology program is presented. Current programs which include numerical modeling of fluid systems, heat exchanger/radiator concept studies, and the design of the Cryogenic Fluid Management Facility are discussed. Recent analytical and experimental activities performed to support the Shuttle/Centaur development activity are highlighted.

  2. Implementation of a data management software system for SSME test history data

    NASA Technical Reports Server (NTRS)

    Abernethy, Kenneth

    1986-01-01

    The implementation of a software system for managing Space Shuttle Main Engine (SSME) test/flight historical data is presented. The software system uses the database management system RIM7 for primary data storage and routine data management, but includes several FORTRAN programs, described here, which provide customized access to the RIM7 database. The consolidation, modification, and transfer of data from the database THIST, to the RIM7 database THISRM is discussed. The RIM7 utility modules for generating some standard reports from THISRM and performing some routine updating and maintenance are briefly described. The FORTRAN accessing programs described include programs for initial loading of large data sets into the database, capturing data from files for database inclusion, and producing specialized statistical reports which cannot be provided by the RIM7 report generator utility. An expert system tutorial, constructed using the expert system shell product INSIGHT2, is described. Finally, a potential expert system, which would analyze data in the database, is outlined. This system could use INSIGHT2 as well and would take advantage of RIM7's compatibility with the microcomputer database system RBase 5000.

  3. Short and long term improvements in quality of chronic care delivery predict program sustainability.

    PubMed

    Cramm, Jane Murray; Nieboer, Anna Petra

    2014-01-01

    Empirical evidence on sustainability of programs that improve the quality of care delivery over time is lacking. Therefore, this study aims to identify the predictive role of short and long term improvements in quality of chronic care delivery on program sustainability. In this longitudinal study, professionals [2010 (T0): n=218, 55% response rate; 2011 (T1): n=300, 68% response rate; 2012 (T2): n=265, 63% response rate] from 22 Dutch disease-management programs completed surveys assessing quality of care and program sustainability. Our study findings indicated that quality of chronic care delivery improved significantly in the first 2 years after implementation of the disease-management programs. At T1, overall quality, self-management support, delivery system design, and integration of chronic care components, as well as health care delivery and clinical information systems and decision support, had improved. At T2, overall quality again improved significantly, as did community linkages, delivery system design, clinical information systems, decision support and integration of chronic care components, and self-management support. Multilevel regression analysis revealed that quality of chronic care delivery at T0 (p<0.001) and quality changes in the first (p<0.001) and second (p<0.01) years predicted program sustainability. In conclusion this study showed that disease-management programs based on the chronic care model improved the quality of chronic care delivery over time and that short and long term changes in the quality of chronic care delivery predicted the sustainability of the projects. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.

  4. 41 CFR 105-64.110 - When may GSA establish computer matching programs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... computer matching programs? 105-64.110 Section 105-64.110 Public Contracts and Property Management Federal... GSA establish computer matching programs? (a) System managers will establish computer matching... direction of the GSA Data Integrity Board that will be established when and if computer matching programs...

  5. 41 CFR 105-64.110 - When may GSA establish computer matching programs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... computer matching programs? 105-64.110 Section 105-64.110 Public Contracts and Property Management Federal... GSA establish computer matching programs? (a) System managers will establish computer matching... direction of the GSA Data Integrity Board that will be established when and if computer matching programs...

  6. 41 CFR 105-64.110 - When may GSA establish computer matching programs?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... computer matching programs? 105-64.110 Section 105-64.110 Public Contracts and Property Management Federal... GSA establish computer matching programs? (a) System managers will establish computer matching... direction of the GSA Data Integrity Board that will be established when and if computer matching programs...

  7. 41 CFR 105-64.110 - When may GSA establish computer matching programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... computer matching programs? 105-64.110 Section 105-64.110 Public Contracts and Property Management Federal... GSA establish computer matching programs? (a) System managers will establish computer matching... direction of the GSA Data Integrity Board that will be established when and if computer matching programs...

  8. 41 CFR 105-64.110 - When may GSA establish computer matching programs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... computer matching programs? 105-64.110 Section 105-64.110 Public Contracts and Property Management Federal... GSA establish computer matching programs? (a) System managers will establish computer matching... direction of the GSA Data Integrity Board that will be established when and if computer matching programs...

  9. --No Title--

    Science.gov Websites

    Search Search Home SH Reference Manual E19 Documentation Program Management Training/Drills Other Dataweb National Water Information System Database SH Reference Manual, E-19 Docs, Program Management

  10. Report to the NASA Administrator by the Aerospace Safety Advisory Panel on the Space Shuttle Program. Part 1: Observations and Conclusions

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Each system was chosen on the basis of its importance with respect to crew safety and mission success. An overview of the systems management is presented. The space shuttle main engine, orbiter thermal protection system, avionics, external tanks and solid rocket boosters were examined. The ground test and ground support equipment programs were studied. Program management was found to have an adequate understanding of the significant ground and flight risks involved.

  11. A taxonomy for disease management: a scientific statement from the American Heart Association Disease Management Taxonomy Writing Group.

    PubMed

    Krumholz, Harlan M; Currie, Peter M; Riegel, Barbara; Phillips, Christopher O; Peterson, Eric D; Smith, Renee; Yancy, Clyde W; Faxon, David P

    2006-09-26

    Disease management has shown great promise as a means of reorganizing chronic care and optimizing patient outcomes. Nevertheless, disease management programs are widely heterogeneous and lack a shared definition of disease management, which limits our ability to compare and evaluate different programs. To address this problem, the American Heart Association's Disease Management Taxonomy Writing Group developed a system of classification that can be used both to categorize and compare disease management programs and to inform efforts to identify specific factors associated with effectiveness. The AHA Writing Group began with a conceptual model of disease management and its components and subsequently validated this model over a wide range of disease management programs. A systematic MEDLINE search was performed on the terms heart failure, diabetes, and depression, together with disease management, case management, and care management. The search encompassed articles published in English between 1987 and 2005. We then selected studies that incorporated (1) interventions designed to improve outcomes and/or reduce medical resource utilization in patients with heart failure, diabetes, or depression and (2) clearly defined protocols with at least 2 prespecified components traditionally associated with disease management. We analyzed the study protocols and used qualitative research methods to develop a disease management taxonomy with our conceptual model as the organizing framework. The final taxonomy includes the following 8 domains: (1) Patient population is characterized by risk status, demographic profile, and level of comorbidity. (2) Intervention recipient describes the primary targets of disease management intervention and includes patients and caregivers, physicians and allied healthcare providers, and healthcare delivery systems. (3) Intervention content delineates individual components, such as patient education, medication management, peer support, or some form of postacute care, that are included in disease management. (4) Delivery personnel describes the network of healthcare providers involved in the delivery of disease management interventions, including nurses, case managers, physicians, pharmacists, case workers, dietitians, physical therapists, psychologists, and information systems specialists. (5) Method of communication identifies a broad range of disease management delivery systems that may include in-person visitation, audiovisual information packets, and some form of electronic or telecommunication technology. (6) Intensity and complexity distinguish between the frequency and duration of exposure, as well as the mix of program components, with respect to the target for disease management. (7) Environment defines the context in which disease management interventions are typically delivered and includes inpatient or hospital-affiliated outpatient programs, community or home-based programs, or some combination of these factors. (8) Clinical outcomes include traditional, frequently assessed primary and secondary outcomes, as well as patient-centered measures, such as adherence to medication, self-management, and caregiver burden. This statement presents a taxonomy for disease management that describes critical program attributes and allows for comparisons across interventions. Routine application of the taxonomy may facilitate better comparisons of structure, process, and outcome measures across a range of disease management programs and should promote uniformity in the design and conduct of studies that seek to validate disease management strategies.

  12. Strategic Plan for Information Systems and Technology, Fiscal Years 1994-1998.

    ERIC Educational Resources Information Center

    National Archives and Records Administration, Washington, DC.

    The information systems and technology management program of the National Archives and Records Administration (NARA) establishes broad policy guidance and technical standards for information management to ensure that appropriate resource sharing can occur, while providing cost-effective support for mission requirements of program offices. The NARA…

  13. Assessing the Effect of a Personal Health Management System Within Retirement Communities: A Preliminary Investigation.

    ERIC Educational Resources Information Center

    Slivinske, Lee R.; Kosberg, Jordan I.

    1984-01-01

    Describes a holistic health care program (Personal Health Management System) initiated within several retirement communities. Initial findings suggested that program participants experienced significant increases in their health and well-being while nonequivalent control group subjects did not. Conceptual and methodological issues are discussed.…

  14. Management System for EMR Work Study Program.

    ERIC Educational Resources Information Center

    Columbia County Board of Public Instruction, Lake City, FL. Exceptional Child Education Dept.

    A computerized information management system involving the specification of objectives, the coding of teacher evaluations of students, and a variety of possible outputs has been used in a work study program for educable mentally retarded adolescents. Instructional objectives are specified and coded by number and category. Evaluation is by means of…

  15. NAIT CPD. Competency Profile Development: A Systems Approach for Program Review Projects.

    ERIC Educational Resources Information Center

    Dhariwal, Mave

    The Engineering Technologies Division of the Northern Alberta Institute of Technology (NAIT) in Canada has developed a systems approach to program review called Competency Profile Development (CPD). This approach utilizes a combination of organizational communication, project management, management-by-objectives, a modified Developing A Curriculum…

  16. Safety management vs. picking leaves.

    PubMed

    Wright, D

    1991-09-01

    A safety program will generally have as its base a comprehensive written document made available for everyone in the organization. The document should indicate a positive commitment to safety by management. It should not be a "how to" guide, but rather a broad outline to establish responsibilities, goals, and methods. The safety manager is appointed in writing and answers to the highest level of management. As opposed to a "doer," the safety manager acts as a director and administrator of the safety program. This is accomplished through the advisory capacity of the safety program for solicited and unsolicited problems. The focus of the safety manager is on the system and how it contributes to safety problems, rather than individual problems. Management has the ultimate responsibility for safety. Their efforts should reflect a proactive attitude to correct problems in the system. In order to identify areas of interest, technically competent input from the safety manager should be required. The support of the safety program by top management determines the success of the program. Without a clear and firm commitment by the organization, safety will receive no more than lip service from the employees. The benefits of a proactive approach will be realized in the organization's ability to manage safety issues, rather than reacting to them.

  17. Alternatives for Revitalizing Student Services Programs.

    ERIC Educational Resources Information Center

    Deegan, William L.

    1984-01-01

    Reviews alternatives for revitalizing the programs and management of community college student services. As program development models, considers Miami-Dade Community College's computer-based instructional management system; entrepreneurial fee-based services; and divestment of situational or special-interest services to student groups. In…

  18. Human Systems Integration in Practice: Constellation Lessons Learned

    NASA Technical Reports Server (NTRS)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  19. 2 CFR 215.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false Standards for financial management systems... Financial and Program Management § 215.21 Standards for financial management systems. (a) Federal awarding agencies shall require recipients to relate financial data to performance data and develop unit cost...

  20. RMP Guidance for Warehouses - Chapter 5: Management System

    EPA Pesticide Factsheets

    Your management system should oversee the implementation of the risk management program elements, and designate and assign responsibility in order to make process safety a constant priority. Includes sample documentation.

  1. Information Management Strategies for Program Tracking and Formative Evaluation

    NASA Astrophysics Data System (ADS)

    Siegfried, D.; Detrick, L.; Valaitis, S.; Johnson, A.; Thomas, S. H.; Fauver, A.

    2013-05-01

    The Institute for Broadening Participation (IBP) has developed information management systems to facilitate programmatic formative evaluation, tracking and outreach activities. Nearly a decade of design solutions and technical implementations in support of IBP's professional development and mentoring programs for students (including the "Pathways to Ocean Science," "Minorities Striving and Pursuing Higher Degrees of Success" in Earth System Science, and "Pathways to Engineering") has provided IBP with a toolbox of proven strategies for addressing program engagement and participant tracking, outreach, and a variety of other information management needs. In this session, IBP will use case-specific examples to share general design strategies for program participant and activities data collection in REUs and other program types. The cases will illustrate an approach that begins with a review of program logic, objectives, expected outcomes, constraints and requirements, which then informs a comprehensive system design. When implemented, such information systems improve administrative efficiency through streamlined data collection processes and easy-to-use data capture forms, and a corresponding set of reporting tools provides access to data that is crucial for ongoing program improvement. IBP presents this information in response to collaborations with administrators of Research Experience for Undergraduates (REU) programs as well as longer duration programs, who have expressed the need for more comprehensive and easy to use information systems. Recently IBP has also worked with the directors of NSF and NASA funded programs seeking assistance in addressing their formative evaluation needs including system design, information collection, and reporting efforts.

  2. A Concept of Constructing a Common Information Space for High Tech Programs Using Information Analytical Systems

    NASA Astrophysics Data System (ADS)

    Zakharova, Alexandra A.; Kolegova, Olga A.; Nekrasova, Maria E.

    2016-04-01

    The paper deals with the issues in program management used for engineering innovative products. The existing project management tools were analyzed. The aim is to develop a decision support system that takes into account the features of program management used for high-tech products: research intensity, a high level of technical risks, unpredictable results due to the impact of various external factors, availability of several implementing agencies. The need for involving experts and using intelligent techniques for information processing is demonstrated. A conceptual model of common information space to support communication between members of the collaboration on high-tech programs has been developed. The structure and objectives of the information analysis system “Geokhod” were formulated with the purpose to implement the conceptual model of common information space in the program “Development and production of new class mining equipment - “Geokhod”.

  3. Using systems science for population health management in primary care.

    PubMed

    Li, Yan; Kong, Nan; Lawley, Mark A; Pagán, José A

    2014-10-01

    Population health management is becoming increasingly important to organizations managing and providing primary care services given ongoing changes in health care delivery and payment systems. The objective of this study is to show how systems science methodologies could be incorporated into population health management to compare different interventions and improve health outcomes. The New York Academy of Medicine Cardiovascular Health Simulation model (an agent-based model) and data from the Behavioral Risk Factor Surveillance System were used to evaluate a lifestyle program that could be implemented in primary care practice settings. The program targeted Medicare-age adults and focused on improving diet and exercise and reducing weight. The simulation results suggest that there would be significant reductions projected in the proportion of the Medicare-age population with diabetes after the implementation of the proposed lifestyle program for a relatively long term (3 and 5 years). Similar results were found for the subpopulations with high cholesterol, but the proposed intervention would not have a significant effect in the proportion of the population with hypertension over a time period of <5 years. Systems science methodologies can be useful to compare the health outcomes of different interventions. These tools can become an important component of population health management because they can help managers and other decision makers evaluate alternative programs in primary care settings. © The Author(s) 2014.

  4. Systematic and Scalable Testing of Concurrent Programs

    DTIC Science & Technology

    2013-12-16

    The evaluation of CHESS [107] checked eight different programs ranging from process management libraries to a distributed execution engine to a research...tool (§3.1) targets systematic testing of scheduling nondeterminism in multi- threaded components of the Omega cluster management system [129], while...tool for systematic testing of multithreaded com- ponents of the Omega cluster management system [129]. In particular, §3.1.1 defines a model for

  5. 77 FR 70061 - Groundfish Fisheries of the Exclusive Economic Zone Off Alaska and Pacific Halibut Fisheries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ...NMFS publishes regulations to implement Amendment 86 to the Fishery Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area and Amendment 76 to the Fishery Management Plan for Groundfish of the Gulf of Alaska (Amendments 86/76). Amendments 86/ 76 add a funding and deployment system for observer coverage to the existing North Pacific Groundfish Observer Program (Observer Program) and amend existing observer coverage requirements for vessels and processing plants. The new funding and deployment system allows NMFS to determine when and where to deploy observers according to management and conservation needs, with funds provided through a system of fees based on the ex-vessel value of groundfish and halibut in fisheries covered by the new system. This action is necessary to resolve data quality and cost equity concerns with the Observer Program's existing funding and deployment structure. This action is intended to promote the goals and objectives of the Magnuson-Stevens Fishery Conservation and Management Act, the Northern Pacific Halibut Act of 1982, the fishery management plans, and other applicable law.

  6. Exploratory Technology Research Program for electrochemical energy storage

    NASA Astrophysics Data System (ADS)

    Kinoshita, Kim

    1994-09-01

    The U.S. Department of Energy's Office of Propulsion Systems provides support for an Electrochemical Energy Storage Program, that includes research and development (R&D) on advanced rechargeable batteries and fuel cells. A major goal of this program is to develop electrochemical power sources suitable for application in electric vehicles (EV's). The program centers on advanced systems that offer the potential for high performance and low life-cycle costs, both of which are necessary to permit significant penetration into commercial markets. The DOE Electrochemical Energy Storage Program is divided into two projects: the Electric Vehicle Advanced Battery Systems (EVABS) Development Program and the Exploratory Technology Research (ETR) Program. The EVABS Program management responsibility has been assigned to Sandia National Laboratories (SNL); Lawrence Berkeley Laboratory (LBL) is responsible for management of the ETR Program. The EVABS and ETR Programs include an integrated matrix of R&D efforts designed to advance progress on selected candidate electrochemical systems. The United States Advanced Battery Consortium (USABC), a tripartite undertaking between DOE, the U.S. automobile manufacturers and the Electric Power Research Institute (EPRI), was formed in 1991 to accelerate the development of advanced batteries for consumer EV's. The role of the FIR Program is to perform supporting research on the advanced battery systems under development by the USABC and EVABS Program, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the ETR Program is to identify the most promising electrochemical technologies and transfer them to the USABC, the battery industry and/or the EVABS Program for further development and scale-up. This report summarizes the research, financial and management activities relevant to the ETR Program in CY 1993.

  7. Exploratory Technology Research Program for electrochemical energy storage

    NASA Astrophysics Data System (ADS)

    Kinoshita, Kim

    1994-09-01

    The U.S. Department of Energy's Office of Propulsion Systems provides support for an Electrochemical Energy Storage Program, that includes research and development (R&D) on advanced rechargeable batteries and fuel cells. A major goal of this program is to develop electrochemical power sources suitable for application in electric vehicles (EV's). The program centers on advanced systems that offer the potential for high performance and low life-cycle costs, both of which are necessary to permit significant penetration into commercial markets. The DOE Electrochemical Energy Storage Program is divided into two projects: the Electric Vehicle Advanced Battery Systems (EVABS) Development Program and the Exploratory Technology Research (ETR) Program. The EVABS Program management responsibility has been assigned to Sandia National Laboratories (SNL); Lawrence Berkeley Laboratory (LBL) is responsible for management of the FIR Program. The EVABS and ETR Programs include an integrated matrix of R&D efforts designed to advance progress on selected candidate electrochemical systems. The United States Advanced Battery Consortium (USABC), a tripartite undertaking between DOE, the U.S. automobile manufacturers and the Electric Power Research Institute (EPRI), was formed in 1991 to accelerate the development of advanced batteries for consumer EV's. The role of the FIR Program is to perform supporting research on the advanced battery systems under development by the USABC and EVABS Program, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the ETR Program is to identify the most promising electrochemical technologies and transfer them to the USABC, the battery industry and/or the EVABS Program for further development and scale-up. This report summarizes the research, financial and management activities relevant to the ETR Program in CY 1993.

  8. 24 CFR 572.230 - Cash and Management Information (C/MI) System.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Cash and Management Information (C... HOMES PROGRAM (HOPE 3) Grants § 572.230 Cash and Management Information (C/MI) System. Disbursement of HOPE 3 grant funds is managed through HUD's Cash and Management Information (C/MI) System for the HOPE...

  9. 24 CFR 572.230 - Cash and Management Information (C/MI) System.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 3 2011-04-01 2010-04-01 true Cash and Management Information (C... HOMES PROGRAM (HOPE 3) Grants § 572.230 Cash and Management Information (C/MI) System. Disbursement of HOPE 3 grant funds is managed through HUD's Cash and Management Information (C/MI) System for the HOPE...

  10. 24 CFR 572.230 - Cash and Management Information (C/MI) System.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Cash and Management Information (C... HOMES PROGRAM (HOPE 3) Grants § 572.230 Cash and Management Information (C/MI) System. Disbursement of HOPE 3 grant funds is managed through HUD's Cash and Management Information (C/MI) System for the HOPE...

  11. 24 CFR 572.230 - Cash and Management Information (C/MI) System.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Cash and Management Information (C... HOMES PROGRAM (HOPE 3) Grants § 572.230 Cash and Management Information (C/MI) System. Disbursement of HOPE 3 grant funds is managed through HUD's Cash and Management Information (C/MI) System for the HOPE...

  12. 24 CFR 572.230 - Cash and Management Information (C/MI) System.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Cash and Management Information (C... HOMES PROGRAM (HOPE 3) Grants § 572.230 Cash and Management Information (C/MI) System. Disbursement of HOPE 3 grant funds is managed through HUD's Cash and Management Information (C/MI) System for the HOPE...

  13. Mississippi Curriculum Framework for Computer Information Systems Technology. Computer Information Systems Technology (Program CIP: 52.1201--Management Information Systems & Business Data). Computer Programming (Program CIP: 52.1201). Network Support (Program CIP: 52.1290--Computer Network Support Technology). Postsecondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for two programs in the state's postsecondary-level computer information systems technology cluster: computer programming and network support. Presented in the introduction are program descriptions and suggested course…

  14. 41 CFR 102-118.270 - Must my agency establish a prepayment audit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a prepayment audit program? 102-118.270 Section 102-118.270 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT Prepayment Audits of Transportation Services Agency Requirements...

  15. 41 CFR 102-118.410 - Can GSA suspend my agency's prepayment audit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agency's prepayment audit program? 102-118.410 Section 102-118.410 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT Prepayment Audits of Transportation Services Suspension of...

  16. 6 CFR 29.4 - Protected Critical Infrastructure Information Program administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Protected Critical Infrastructure Information Management System (PCIIMS). The PCII Program Manager shall... be known as the “Protected Critical Infrastructure Information Management System” (PCIIMS), to record... 6 Domestic Security 1 2014-01-01 2014-01-01 false Protected Critical Infrastructure Information...

  17. 6 CFR 29.4 - Protected Critical Infrastructure Information Program administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Protected Critical Infrastructure Information Management System (PCIIMS). The PCII Program Manager shall... be known as the “Protected Critical Infrastructure Information Management System” (PCIIMS), to record... 6 Domestic Security 1 2011-01-01 2011-01-01 false Protected Critical Infrastructure Information...

  18. 6 CFR 29.4 - Protected Critical Infrastructure Information Program administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Protected Critical Infrastructure Information Management System (PCIIMS). The PCII Program Manager shall... be known as the “Protected Critical Infrastructure Information Management System” (PCIIMS), to record... 6 Domestic Security 1 2010-01-01 2010-01-01 false Protected Critical Infrastructure Information...

  19. 6 CFR 29.4 - Protected Critical Infrastructure Information Program administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Protected Critical Infrastructure Information Management System (PCIIMS). The PCII Program Manager shall... be known as the “Protected Critical Infrastructure Information Management System” (PCIIMS), to record... 6 Domestic Security 1 2012-01-01 2012-01-01 false Protected Critical Infrastructure Information...

  20. 6 CFR 29.4 - Protected Critical Infrastructure Information Program administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Protected Critical Infrastructure Information Management System (PCIIMS). The PCII Program Manager shall... be known as the “Protected Critical Infrastructure Information Management System” (PCIIMS), to record... 6 Domestic Security 1 2013-01-01 2013-01-01 false Protected Critical Infrastructure Information...

  1. Experience of health-system pharmacy administration residents in a longitudinal human resource management program.

    PubMed

    Amerine, Lindsey B Poppe; Granko, Robert P; Savage, Scott W; Daniels, Rowell; Eckel, Stephen F

    2014-12-15

    The experience of health-system pharmacy administration (HSPA) residents in a longitudinal human resource (HR) management program is described. The subsequent benefits to the residents, department, and profession are also discussed. Postgraduate year 2 HSPA residents at an academic medical center desired more responsibility for managing an operational area. To this end, a program was created in which these residents directly manage a small group of pharmacy technicians and report to a clinical manager or assistant director with oversight responsibility. These "resident managers" are responsible, under the direction of the area's clinical manager, for the personnel, schedule, time and attendance, and HR activities of the area. Resident managers have led and sustained operational improvement projects in their areas. In addition to providing learning experiences to residents, the HSPA residency program has also improved the operations of the areas in which these residents work. Benefits to the residents include conducting annual performance evaluations for employees with whom they have a relationship as it is a task every administrator completes. Resident managers at UNC have consistently stated that this longitudinal HR experience is one of the most rewarding and most challenging experiences offered in the two-year HSPA residency. The involvement of HSPA residents in longitudinal management responsibilities furthers residents' leadership success by providing trained managers who are ready to immerse themselves into practice postresidency, having employee engagement and HR skills as well as experiences with leading operational improvements. A longitudinal HR management experience was successfully incorporated into an HSPA residency combined Master of Science degree program. Copyright © 2014 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  2. Assessing the quality of cost management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fayne, V.; McAllister, A.; Weiner, S.B.

    1995-12-31

    Managing environmental programs can be effective only when good cost and cost-related management practices are developed and implemented. The Department of Energy`s Office of Environmental Management (EM), recognizing this key role of cost management, initiated several cost and cost-related management activities including the Cost Quality Management (CQM) Program. The CQM Program includes an assessment activity, Cost Quality Management Assessments (CQMAs), and a technical assistance effort to improve program/project cost effectiveness. CQMAs provide a tool for establishing a baseline of cost-management practices and for measuring improvement in those practices. The result of the CQMA program is an organization that has anmore » increasing cost-consciousness, improved cost-management skills and abilities, and a commitment to respond to the public`s concerns for both a safe environment and prudent budget outlays. The CQMA program is part of the foundation of quality management practices in DOE. The CQMA process has contributed to better cost and cost-related management practices by providing measurements and feedback; defining the components of a quality cost-management system; and helping sites develop/improve specific cost-management techniques and methods.« less

  3. 48 CFR 2146.270 - FEGLI Program quality assurance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 2146.270 FEGLI Program quality assurance requirements. (a) The... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false FEGLI Program quality...

  4. 48 CFR 2146.270 - FEGLI Program quality assurance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 2146.270 FEGLI Program quality assurance requirements. (a) The... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false FEGLI Program quality...

  5. 48 CFR 2146.270 - FEGLI Program quality assurance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 2146.270 FEGLI Program quality assurance requirements. (a) The... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false FEGLI Program quality...

  6. 48 CFR 2146.270 - FEGLI Program quality assurance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 2146.270 FEGLI Program quality assurance requirements. (a) The... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false FEGLI Program quality...

  7. 48 CFR 2146.270 - FEGLI Program quality assurance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MANAGEMENT, FEDERAL EMPLOYEES GROUP LIFE INSURANCE FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 2146.270 FEGLI Program quality assurance requirements. (a) The... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true FEGLI Program quality...

  8. NASA Risk Management Handbook. Version 1.0

    NASA Technical Reports Server (NTRS)

    Dezfuli, Homayoon; Benjamin, Allan; Everett, Christopher; Maggio, Gaspare; Stamatelatos, Michael; Youngblood, Robert; Guarro, Sergio; Rutledge, Peter; Sherrard, James; Smith, Curtis; hide

    2011-01-01

    The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \\Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.

  9. The business concept of leader pricing as applied to heart failure disease management.

    PubMed

    Hauptman, Paul J; Bednarek, Heather L

    2004-01-01

    The implementation of a disease management approach for patients with heart failure has been promoted as a way to improve outcomes, including a decrease in hospitalizations. However, in the absence of rigorous cost analyses and with revenues limited by professional fees, heart failure disease management programs may appear to operate at a loss. The literature outlining the importance of disease management for patients with heart failure is summarized. We review the limitations of current cost analyses and outline the economic concepts of leader pricing, vertical integration and transaction costs to argue that heart failure disease management programs may provide significant "downstream" revenue for an integrated system of health care delivery in a fee-for-service payment structure, while reducing overall costs of care. Pilot data from a university-based program are used in support of this argument. In addition, the favorable impact on patient satisfaction and loyalty can enhance market share, a vital consideration for all health systems. Options for improving the reputation of heart failure disease management within a health system are suggested. Viewed as a loss leader, disease management provides not only quality care for patients with heart failure but also appears to provide financial benefits to the health system that funds the infrastructure and administration of the program. The actual magnitude of this benefit and the degree to which it mitigates overall administration costs requires further study.

  10. Case Study of American Healthways' Diabetes Disease Management Program

    PubMed Central

    Pope, James E.; Hudson, Laurel R.; Orr, Patty M.

    2005-01-01

    Disease management has been defined as a system of coordinated health care interventions and communications for populations with conditions in which patient self-care efforts are significant (Disease Management Association of America, 2005). The purpose of this article is to provide an overview of the diabetes disease management program offered by American Healthways (AMHC) and highlight recently reported results of this program (Villagra, 2004a; Espinet et al., 2005). PMID:17288077

  11. Marshall information retrieval and display system (MIRADS)

    NASA Technical Reports Server (NTRS)

    Groover, J. L.; Jones, S. C.; King, W. L.

    1974-01-01

    Program for data management system allows sophisticated inquiries while utilizing simplified language. Online system is composed of several programs. System is written primarily in COBOL with routines in ASSEMBLER and FORTRAN V.

  12. 41 CFR 101-26.507-4 - Quantities in excess of the maximum order limitation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Quantities in excess of... Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26.507-4 Quantities in...

  13. 41 CFR 101-26.508-1 - Requisitioning data processing tape available through Federal Supply Schedule contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...

  14. 41 CFR 102-33.180 - What standards must we establish or require (contractually, where applicable) for flight program...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... must be— (1) Experienced as pilots or crewmembers or in aviation operations management/flight program... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What standards must we....180 Public Contracts and Property Management Federal Property Management Regulations System (Continued...

  15. 20 CFR 668.800 - What systems must an INA grantee have in place to administer an INA program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... procedures the grantee uses for: (1) The hiring and management of personnel paid with program funds; (2) The acquisition and management of property purchased with program funds; (3) Financial management practices; (4) A... she provided is true to the best of his/her knowledge; and (3) The information necessary to comply...

  16. 20 CFR 668.800 - What systems must an INA grantee have in place to administer an INA program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... procedures the grantee uses for: (1) The hiring and management of personnel paid with program funds; (2) The acquisition and management of property purchased with program funds; (3) Financial management practices; (4) A... she provided is true to the best of his/her knowledge; and (3) The information necessary to comply...

  17. 20 CFR 668.800 - What systems must an INA grantee have in place to administer an INA program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... procedures the grantee uses for: (1) The hiring and management of personnel paid with program funds; (2) The acquisition and management of property purchased with program funds; (3) Financial management practices; (4) A... she provided is true to the best of his/her knowledge; and (3) The information necessary to comply...

  18. Creating and Sustaining Effective Partnership between Government and Industry

    DTIC Science & Technology

    2011-04-30

    defense industry, fielding, contracting, interoperability, organizational behavior, risk management , cost estimating, and many others. Approaches...Finance from Cameron University and an MBA from Drury University. [scott.fouse@dau.mil] Allen Green—Engineer and Program Manager , SAIC, Inc...Program Executive Officer SHIPS • Commander, Naval Sea Systems Command • Army Contracting Command, U.S. Army Materiel Command • Program Manager , Airborne

  19. The visual management system of the Forest Service, USDA

    Treesearch

    Warren R. Bacon

    1979-01-01

    The National Forest Landscape Management Program began, as a formal program, at a Servicewide meeting in St. Louis in 1969 in response to growing agency and public concern for the visual resource. It is now an accepted part of National Forest management and is supported by a large and growing foundation of handbooks, research papers, and audio/visual programs. This...

  20. Special report writer: A flexible information management system. Documentation and user's manual

    NASA Technical Reports Server (NTRS)

    Greene, W. A.

    1976-01-01

    A special report writer (SSR) was developed which performs multiple correlations on files containing several data hierarchies. Output reports are specified in a simple notation, readily learned by persons having limited familarity with ADP. The SRR system can be adopted by other NASA installations while the basic techniques themselves are compatible with the information management needs of a wide range of organizations. Specifically, the program lends itself to generalization and can be readily adapted for other file management purposes. Extensive details on the characteristics of the SRR program are presented along with a full explanation of the system for those contemplating its application to other data bases. The complete COBOL program and documentation are available.

  1. Evaluation of Capacity-Building Program of District Health Managers in India: A Contextualized Theoretical Framework

    PubMed Central

    Prashanth, N. S.; Marchal, Bruno; Kegels, Guy; Criel, Bart

    2014-01-01

    Performance of local health services managers at district level is crucial to ensure that health services are of good quality and cater to the health needs of the population in the area. In many low- and middle-income countries, health services managers are poorly equipped with public health management capacities needed for planning and managing their local health system. In the south Indian Tumkur district, a consortium of five non-governmental organizations partnered with the state government to organize a capacity-building program for health managers. The program consisted of a mix of periodic contact classes, mentoring and assignments and was spread over 30 months. In this paper, we develop a theoretical framework in the form of a refined program theory to understand how such a capacity-building program could bring about organizational change. A well-formulated program theory enables an understanding of how interventions could bring about improvements and an evaluation of the intervention. In the refined program theory of the intervention, we identified various factors at individual, institutional, and environmental levels that could interact with the hypothesized mechanisms of organizational change, such as staff’s perceived self-efficacy and commitment to their organizations. Based on this program theory, we formulated context–mechanism–outcome configurations that can be used to evaluate the intervention and, more specifically, to understand what worked, for whom and under what conditions. We discuss the application of program theory development in conducting a realist evaluation. Realist evaluation embraces principles of systems thinking by providing a method for understanding how elements of the system interact with one another in producing a given outcome. PMID:25121081

  2. Evaluation of capacity-building program of district health managers in India: a contextualized theoretical framework.

    PubMed

    Prashanth, N S; Marchal, Bruno; Kegels, Guy; Criel, Bart

    2014-01-01

    Performance of local health services managers at district level is crucial to ensure that health services are of good quality and cater to the health needs of the population in the area. In many low- and middle-income countries, health services managers are poorly equipped with public health management capacities needed for planning and managing their local health system. In the south Indian Tumkur district, a consortium of five non-governmental organizations partnered with the state government to organize a capacity-building program for health managers. The program consisted of a mix of periodic contact classes, mentoring and assignments and was spread over 30 months. In this paper, we develop a theoretical framework in the form of a refined program theory to understand how such a capacity-building program could bring about organizational change. A well-formulated program theory enables an understanding of how interventions could bring about improvements and an evaluation of the intervention. In the refined program theory of the intervention, we identified various factors at individual, institutional, and environmental levels that could interact with the hypothesized mechanisms of organizational change, such as staff's perceived self-efficacy and commitment to their organizations. Based on this program theory, we formulated context-mechanism-outcome configurations that can be used to evaluate the intervention and, more specifically, to understand what worked, for whom and under what conditions. We discuss the application of program theory development in conducting a realist evaluation. Realist evaluation embraces principles of systems thinking by providing a method for understanding how elements of the system interact with one another in producing a given outcome.

  3. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  5. Research and Design of Embedded Wireless Meal Ordering System Based on SQLite

    NASA Astrophysics Data System (ADS)

    Zhang, Jihong; Chen, Xiaoquan

    The paper describes features and internal architecture and developing method of SQLite. And then it gives a design and program of meal ordering system. The system realizes the information interaction among the users and embedded devices with SQLite as database system. The embedded database SQLite manages the data and achieves wireless communication by using Bluetooth. A system program based on Qt/Embedded and Linux drivers realizes the local management of environmental data.

  6. Managing Conflict in Temporary Management Systems

    ERIC Educational Resources Information Center

    Wilemon, David L.

    1973-01-01

    As organizational tasks have grown more complex, several innovative temporary management systems such as matrix management have been developed. The Apollo space program has been an important contribution to the development of matrix management techniques. Discusses the role of conflict within the matrix, its determinants, and the process of…

  7. Capacity planning for waste management systems: an interval fuzzy robust dynamic programming approach.

    PubMed

    Nie, Xianghui; Huang, Guo H; Li, Yongping

    2009-11-01

    This study integrates the concepts of interval numbers and fuzzy sets into optimization analysis by dynamic programming as a means of accounting for system uncertainty. The developed interval fuzzy robust dynamic programming (IFRDP) model improves upon previous interval dynamic programming methods. It allows highly uncertain information to be effectively communicated into the optimization process through introducing the concept of fuzzy boundary interval and providing an interval-parameter fuzzy robust programming method for an embedded linear programming problem. Consequently, robustness of the optimization process and solution can be enhanced. The modeling approach is applied to a hypothetical problem for the planning of waste-flow allocation and treatment/disposal facility expansion within a municipal solid waste (MSW) management system. Interval solutions for capacity expansion of waste management facilities and relevant waste-flow allocation are generated and interpreted to provide useful decision alternatives. The results indicate that robust and useful solutions can be obtained, and the proposed IFRDP approach is applicable to practical problems that are associated with highly complex and uncertain information.

  8. Enhancing the role of case managers with specialty populations: development and evaluation of a palliative care education program.

    PubMed

    Howell, Doris; Prestwich, Catherine; Laughlin, Emmy; Giga, Nasreen

    2004-01-01

    Palliative home care is an important component of the care system for patients at the end of life and case management is considered an essential element of the Canadian home care system. Case managers play a critical role in allocating resources, thus influencing the costs and the viability of palliative home care. Case management education programs focused on care coordination with specialty palliative care populations are nonexistent. An education program targeted at improving the knowledge and skills of case managers in allocating resources to palliative care populations was developed and pilot-tested in a metropolitan Canadian city home care program. Core curriculum was based on an initial learning needs assessment and used case-based problem solving to enhance case-management skills. An improvement in knowledge was noted on posttests and case managers described increased comfort and confidence in their role as case managers to this patient population. Home care organizations caring for palliative care populations must ensure case managers are prepared for case management roles with specialty populations if the home is to be rendered an appropriate and viable care setting for patients at the end of life.

  9. A management system for evaluating the Virginia periodic motor vehicle inspection program : software manual and implementation procedures : final report.

    DOT National Transportation Integrated Search

    1978-01-01

    This report deals with the Periodic Motor Vehicle Inspection Management Evaluation System software documentation and implementation procedures. A companion report entitled "A Management System for Evaluating the Virginia Periodic Motor Vehicle Inspec...

  10. A Statewide Management Information System for the Control of Sexually Transmitted Diseases

    PubMed Central

    Fichtner, Ronald R.; Blount, Joseph H.; Spencer, Jack N.

    1983-01-01

    The persistent endemicity in the U.S. of infectious syphilis and gonorrhea, together with increasing diagnoses of gonococcal-related pelvic inflammatory disease in women and genital herpes infections, have intensified pressures on state and local VD control programs to measure, analyze, and interpret the distribution and transmission of these and other sexually transmitted diseases. In response, the Division of Venereal Disease Control (DVDC) of the Centers for Disease Control (CDC) is participating in the development of three state-wide, prototype sexually transmitted disease (STD) management information systems. A systems analysis of a typical state-wide STD control program indicated that timely, comprehensive, informational support to public health managers and policy makers should be combined with rapid, direct support of program activities using an on-line, integrated data base, computer system with telecommunications capability. This methodology uses a data base management system, query facility for ad hoc inquiries, custom design philosophies, but utilizes distinct hardware and software implementations.

  11. Financial management challenges for general hospital psychiatry 2001.

    PubMed

    Goldberg, R J

    2001-01-01

    Psychiatry programs are facing significant business and financial challenges. This paper provides an overview of these management challenges in five areas: departmental, hospital, payment system, general finance, and policy. Psychiatric leaders will require skills in a variety of business management areas to ensure their program success. Many programs will need to develop new compensation models with more of an emphasis on revenue collection and overhead management. Programs which cannot master these areas are likely to go out of business. For academic programs, incentive systems must address not only clinical productivity, but academic and teaching output as well. General hospital programs will need to develop increased sophistication in differential cost accounting in order to be able to advocate for their patients and program in the current management climate. Clinical leaders will need the skills (ranging from actuarial to negotiations) to be at the table with contract development, since those decisions are inseparable from clinical care issues. Strategic planning needs to consider the value of improving integration with primary care, along with the ability to understand the advantages and disadvantages of risk-sharing models. Psychiatry leaders need to define and develop useful reports shared with clinical division leadership to track progress and identify problems and opportunities. Leaders should be responsible for a strategy for developing appropriate information system architecture and infrastructure. Finally, it is hoped that some leaders will emerge who can further our needs to address inequities in mental health fee schedules and parity issues which affect our program viability.

  12. Monitoring components of GypsES

    Treesearch

    Lukas P. Schaub; F. William Ravlin; Jesse A. Logan; Shelby J. Fleischer

    1991-01-01

    The manager needs tools for assistance in planning and interpreting monitoring systems. We are building a system that designs sampling programs by interpreting data about Gypsy Moth, stand condition and management objectives. The system prioritizes areas within the management unit within budgetary constraints and defines the areas to be monitored. The system proposes...

  13. Fuzzy robust credibility-constrained programming for environmental management and planning.

    PubMed

    Zhang, Yimei; Hang, Guohe

    2010-06-01

    In this study, a fuzzy robust credibility-constrained programming (FRCCP) is developed and applied to the planning for waste management systems. It incorporates the concepts of credibility-based chance-constrained programming and robust programming within an optimization framework. The developed method can reflect uncertainties presented as possibility-density by fuzzy-membership functions. Fuzzy credibility constraints are transformed to the crisp equivalents with different credibility levels, and ordinary fuzzy inclusion constraints are determined by their robust deterministic constraints by setting a-cut levels. The FRCCP method can provide different system costs under different credibility levels (lambda). From the results of sensitivity analyses, the operation cost of the landfill is a critical parameter. For the management, any factors that would induce cost fluctuation during landfilling operation would deserve serious observation and analysis. By FRCCP, useful solutions can be obtained to provide decision-making support for long-term planning of solid waste management systems. It could be further enhanced through incorporating methods of inexact analysis into its framework. It can also be applied to other environmental management problems.

  14. A systems engineering management approach to resource management applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  15. Effective Records Management: The District Administrator's Role.

    ERIC Educational Resources Information Center

    Marrese, Marylynn

    1990-01-01

    School districts should have a records management system through which student, employee, and related documents are maintained. Explains the meaning of records management, the implications of choosing not to establish an ongoing program, and how to be a leader in the program. (eight references) (MLF)

  16. 41 CFR 102-118.300 - How does my agency fund its prepayment audit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... its prepayment audit program? 102-118.300 Section 102-118.300 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT Prepayment Audits of Transportation Services Agency Requirements...

  17. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  18. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  19. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  20. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Workplace substance abuse programs-management and operating contracts. 970.2305 Section 970.2305 Federal Acquisition Regulations... Work Place 970.2305 Workplace substance abuse programs—management and operating contracts. ...

  1. Internship - practical education

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porell, A.L.; Bauman, H.F.

    1989-01-01

    The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less

  2. Benchmarking processes for managing large international space programs

    NASA Technical Reports Server (NTRS)

    Mandell, Humboldt C., Jr.; Duke, Michael B.

    1993-01-01

    The relationship between management style and program costs is analyzed to determine the feasibility of financing large international space missions. The incorporation of management systems is considered to be essential to realizing low cost spacecraft and planetary surface systems. Several companies ranging from large Lockheed 'Skunk Works' to small companies including Space Industries, Inc., Rocket Research Corp., and Orbital Sciences Corp. were studied. It is concluded that to lower the prices, the ways in which spacecraft and hardware are developed must be changed. Benchmarking of successful low cost space programs has revealed a number of prescriptive rules for low cost managements, including major changes in the relationships between the public and private sectors.

  3. Total Library Computerization, Version 2: A DOS-Based Program from On Point, Inc., for Managing Small to Midsized Libraries.

    ERIC Educational Resources Information Center

    Combs, Joseph, Jr.

    1995-01-01

    Reviews the Total Library Computerization program, which can be used to manage small to midsized libraries. Discusses costs; operating system requirements; security features; user-interface styles; and system modules including online cataloging, circulation, serials control, acquisitions, authorities control, and interlibrary loan. (Author/JMV)

  4. 75 FR 78725 - Recreational Boating Safety Projects, Programs and Activities Funded Under Provisions of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-16

    ... defect. ($17,335). Web-based Document Management System: Funding was provided to continue to provide a web-based document management system to better enable the handling of thousands of recreational... program strategy support to the nation-wide RBS effort. The goal is to coordinate the RBS outreach...

  5. 75 FR 23822 - Notice of Opportunity for Public Comment on the Proposed Models for Plant-Specific Adoption of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... Agencywide Documents Access and Management System (ADAMS) under Accession Number ML092670242. The proposed... and Maintenance Program'' is being proposed for Section [5.5] [``Administrative Controls--Programs and... and Management System (ADAMS): Publicly available documents created or received at the NRC are...

  6. Space station data system analysis/architecture study. Task 5: Program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Cost estimates for both the on-board and ground segments of the Space Station Data System (SSDS) are presented along with summary program schedules. Advanced technology development recommendations are provided in the areas of distributed data base management, end-to-end protocols, command/resource management, and flight qualified artificial intelligence machines.

  7. Model Adoption Exchange Payment System: Technical Specifications and User Instructions.

    ERIC Educational Resources Information Center

    Ambrosino, Robert J.

    This user's manual, designed to meet the needs of adoption exchange administrators and program managers for a formal tool to assist them in the overall management and operation of their program, presents the Model Adoption Exchange Payment System (MAEPS), which was developed to improve the delivery of adoption exchange services throughout the…

  8. Defense Enterprise Accounting and Management System-Increment 1 (DEAMS Inc 1)

    DTIC Science & Technology

    2016-03-01

    information accurately and in conformance with Generally Accepted Accounting Principles , to comply with Congressional requirements of the Chief Financial ...2016 Major Automated Information System Annual Report Defense Enterprise Accounting and Management System-Increment 1 (DEAMS Inc 1) Defense...Phone: 937-257-2714 Fax: DSN Phone: 787-2714 DSN Fax: Date Assigned: August 17, 2015 Program Information Program Name Defense Enterprise Accounting

  9. The Effectiveness of Using Learning Management Systems and Collaborative Tool in Web-Based Teaching of Programming Languages

    ERIC Educational Resources Information Center

    Cavus, Nadire; Uzunboylu, Huseyin; Ibrahim, Dogan

    2006-01-01

    This paper is about a pilot study which has been carried out at the Near East University during the 2004/5 Fall Semester using the Moodle LMS [learning management system] together with GREWPtool collaborative editor. The system has been tested with 36 students taking the Java and the Pascal programming courses. The results of the pilot study…

  10. A Symbiosis between Instructional Systems Design and Project Management

    ERIC Educational Resources Information Center

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  11. 76 FR 54809 - Submission for Review: Standard Form 1153: Claim for Unpaid Compensation of Deceased Civilian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... and request for comments. SUMMARY: Merit System Audit and Compliance, Office of Personnel Management..., U.S. Office of Personnel Management, Merit System Audit and Compliance, Room 6484, 1900 E Street, NW... Classification and Pay Claims Program Manager, U.S. Office of Personnel Management, Merit System Audit and...

  12. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  13. Obesity weight management and bariatric surgery case management programs: a review of literature.

    PubMed

    Echols, Jennie

    2010-01-01

    The proportion of Americans with clinically severe obesity has vast implications for the nation's healthcare system since this population have twice as many chronic medical conditions as people with normal weight. Through the use of review of literature, this article (a) describes the types of weight loss programs; (b) reviews the results from studies on effectiveness of bariatric surgery; and (c) identifies recommendations for obesity and bariatric surgery case management programs. Disease management companies appear to be concentrating on general weight loss strategies associated with wellness and other condition-specific disease management products, whereas larger national healthcare companies with at-risk and insurance products offer specific bariatric surgery management products. Case management programs within healthcare systems, health management organizations, and insurance companies are frequently faced with the management of individuals with morbid obesity and, increasingly, those who are requesting or have undergone bariatric surgery. Research shows that morbid obesity is a disease that remains generally unresponsive to diet and drug therapy but appears to respond well to bariatric surgery. Research findings suggest that surgical treatment is more effective than pharmacological treatment of weight loss and the control of some comorbidities associated with obesity. The number of Americans having weight loss surgery increased by 804% between 1998 and 2004, which appears to be a driver for the recent development of obesity disease management and bariatric surgery case management programs. Although the immaturity and lack of studies citing outcomes of obesity disease and case management programs limit the identification of best practices based on outcomes, emerging practices can be identified and recommendations for case management can be formulated. In addition to primary prevention and treatment programs for obesity, this article describes program activities in detail for the following key areas: (1) identification and engagement; (2) coaching, education, and support; (3) collaboration among treating providers; (4) preparation, management, and follow-up when bariatric surgery is indicated; (5) aggressive follow-up until personal goals are achieved; and (6) outcome measurement.

  14. Continuous Risk Management: A NASA Program Initiative

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  15. Intelligent Systems for Power Management and Distribution

    NASA Technical Reports Server (NTRS)

    Button, Robert M.

    2002-01-01

    The motivation behind an advanced technology program to develop intelligent power management and distribution (PMAD) systems is described. The program concentrates on developing digital control and distributed processing algorithms for PMAD components and systems to improve their size, weight, efficiency, and reliability. Specific areas of research in developing intelligent DC-DC converters and distributed switchgear are described. Results from recent development efforts are presented along with expected future benefits to the overall PMAD system performance.

  16. The Cheetah Data Management System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kunz, P.F.; Word, G.B.

    1991-03-01

    Cheetah is a data management system based on the C programming language. The premise of Cheetah is that the banks' of FORTRAN based systems should be structures' as defined by the C language. Cheetah is a system to mange these structures, while preserving the use of the C language in its native form. For C structures managed by Cheetah, the user can use Cheetah utilities such as reading and writing, in a machine independent form, both binary and text files to disk or over a network. Files written by Cheetah also contain a dictionary describing in detail the data containedmore » in the file. Such information is intended to be used by interactive programs for presenting the contents of the file. Such information is intended to be used by interactive programs for presenting the contents of file. Cheetah has been ported to many different operating systems with no operating system dependent switches.« less

  17. Space Station Information Systems

    NASA Technical Reports Server (NTRS)

    Pittman, Clarence W.

    1988-01-01

    The utility of the Space Station is improved, the ability to manage and integrate its development and operation enhanced, and the cost and risk of developing the software for it is minimized by three major information systems. The Space Station Information System (SSIS) provides for the transparent collection and dissemination of operational information to all users and operators. The Technical and Management Information System (TMIS) provides all the developers with timely and consistent program information and a project management 'window' to assess the project status. The Software Support Environment (SSE) provides automated tools and standards to be used by all software developers. Together, these three systems are vital to the successful execution of the program.

  18. Design and implementation of a nuclear weapons management system submodule: Shipboard security force system. Master's thesis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Settlemyer, S.R.

    1991-09-01

    The Nuclear Weapons Management System combines the strengths of an expert system with the flexibility of a database management system to assist the Weapons Officer, Security Officer, and the Personnel Reliability Program Officer in the performance of administrative duties associated with the nuclear weapons programs in the United States Navy. This thesis examines the need for, and ultimately the design of, a system that will assist the Security Officer in administrative duties associated with the Shipboard Self Defense Force. This system, designed and coded utilizing dBASE IV, can be implemented as a stand alone system. Furthermore, it interfaces with themore » expert system submodule that handles the PRP screening process.« less

  19. 49 CFR 659.15 - System safety program standard.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... included in the affected rail transit agency's system safety program plan relating to the hazard management... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program standard. 659.15 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the...

  20. 41 CFR 102-118.350 - Does establishing a prepayment audit system or program change the responsibilities of the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... prepayment audit system or program change the responsibilities of the certifying officers? 102-118.350... System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT... Does establishing a prepayment audit system or program change the responsibilities of the certifying...

  1. Centralized Control of Defense Acquisition Programs: A Comparative Review of the Framework from 1987 - 2003

    DTIC Science & Technology

    2003-09-29

    for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget...selected to be the Product Manager for the Joint Advanced Special Operations Radio System, at Fort Monmouth, New Jersey and successfully completed a...use,” or in defense terms-- operational effectiveness and suitability. Beyond the business aspects of program management , measurement of system

  2. An analysis of the technical status of high level radioactive waste and spent fuel management systems

    NASA Technical Reports Server (NTRS)

    English, T.; Miller, C.; Bullard, E.; Campbell, R.; Chockie, A.; Divita, E.; Douthitt, C.; Edelson, E.; Lees, L.

    1977-01-01

    The technical status of the old U.S. mailine program for high level radioactive nuclear waste management, and the newly-developing program for disposal of unreprocessed spent fuel was assessed. The method of long term containment for both of these waste forms is considered to be deep geologic isolation in bedded salt. Each major component of both waste management systems is analyzed in terms of its scientific feasibility, technical achievability and engineering achievability. The resulting matrix leads to a systematic identification of major unresolved technical or scientific questions and/or gaps in these programs.

  3. Summary of development and recommendations for a quality assurance program for the procurement and manufacture of urban mass transit operating equipment and systems

    NASA Technical Reports Server (NTRS)

    Witkin, S. A.

    1976-01-01

    A viable quality program for the urban mass transit industry, and a management approach to ensure compliance with the program are outlined. Included are: (1) a set of guidelines for quality assurance to be imposed on transit authorities, and a management approach to ensure compliance with them; (2) a management approach to be used by the transit authorities (properties) for assuring compliance with the QA guidelines; and (3) quality assurance guidelines to be imposed by properties and umta for procurement of hardware and systems.

  4. Technology-based management of environmental organizations using an Environmental Management Information System (EMIS): Design and development

    NASA Astrophysics Data System (ADS)

    Kouziokas, Georgios N.

    2016-01-01

    The adoption of Information and Communication Technologies (ICT) in environmental management has become a significant demand nowadays with the rapid growth of environmental information. This paper presents a prototype Environmental Management Information System (EMIS) that was developed to provide a systematic way of managing environmental data and human resources of an environmental organization. The system was designed using programming languages, a Database Management System (DBMS) and other technologies and programming tools and combines information from the relational database in order to achieve the principal goals of the environmental organization. The developed application can be used to store and elaborate information regarding: human resources data, environmental projects, observations, reports, data about the protected species, environmental measurements of pollutant factors or other kinds of analytical measurements and also the financial data of the organization. Furthermore, the system supports the visualization of spatial data structures by using geographic information systems (GIS) and web mapping technologies. This paper describes this prototype software application, its structure, its functions and how this system can be utilized to facilitate technology-based environmental management and decision-making process.

  5. Making automated computer program documentation a feature of total system design

    NASA Technical Reports Server (NTRS)

    Wolf, A. W.

    1970-01-01

    It is pointed out that in large-scale computer software systems, program documents are too often fraught with errors, out of date, poorly written, and sometimes nonexistent in whole or in part. The means are described by which many of these typical system documentation problems were overcome in a large and dynamic software project. A systems approach was employed which encompassed such items as: (1) configuration management; (2) standards and conventions; (3) collection of program information into central data banks; (4) interaction among executive, compiler, central data banks, and configuration management; and (5) automatic documentation. A complete description of the overall system is given.

  6. [Applications of the hospital statistics management system].

    PubMed

    Zhai, Hong; Ren, Yong; Liu, Jing; Li, You-Zhang; Ma, Xiao-Long; Jiao, Tao-Tao

    2008-01-01

    The Hospital Statistics Management System is built on an Office Automation Platform of Shandong provincial hospital system. Its workflow, role and popedom technologies are used to standardize and optimize the management program of statistics in the total quality control of hospital statistics. The system's applications have combined the office automation platform with the statistics management in a hospital and this provides a practical example of a modern hospital statistics management model.

  7. Cost-Benefit Analysis for ECIA Chapter 1 and State DPPF Programs Comparing Groups Receiving Regular Program Instruction and Groups Receiving Computer Assisted Instruction/Computer Management System (CAI/CMS). 1986-87.

    ERIC Educational Resources Information Center

    Chamberlain, Ed

    A cost benefit study was conducted to determine the effectiveness of a computer assisted instruction/computer management system (CAI/CMS) as an alternative to conventional methods of teaching reading within Chapter 1 and DPPF funded programs of the Columbus (Ohio) Public Schools. The Chapter 1 funded Compensatory Language Experiences and Reading…

  8. Data Element Dictionary: Finance. A Technical Report Concerning Finance Related Data Elements in the WICHE Management Information Systems Program. First Edition.

    ERIC Educational Resources Information Center

    Thomas, Charles R.

    This document is one of the 5 sections of the Data Element Dictionary developed as part of the WICHE Management Information Systems (MIS) Program. The elements in this section apply to both the current and historical data concerning finance. The purpose of the WICHE MIS Program is to make it possible to derive data which will be truly comparable…

  9. Infusing Stretch Goal Requirements into the Constellation Program

    NASA Technical Reports Server (NTRS)

    Lee, Young H.; Galpin, Roger A.; Ingoldsby, Kevin

    2008-01-01

    In 2004, the Vision for Space Exploration (VSE) was announced by the United States President's Administration in an effort to explore space and to extend a human presence across our solar system. Subsequently, the National Aeronautics and Space Administration (NASA) established the Exploration Systems Mission Directorate (ESMD) to develop a constellation of new capabilities, supporting technologies, and foundational research that allows for the sustained and affordable exploration of space. Then, ESMD specified the primary mission for the Constellation Program to carry out a series of human expeditions, ranging from Low Earth Orbit (LEO) to the surface of Moon, Mars, and beyond for the purposes of conducting human exploration of space. Thus, the Constellation Program was established at the Lyndon B. Johnson Space Center (JSC) to manage the development of the flight and ground infrastructure and systems that can enable continued and extended human access to space. Constellation Program's "Design Objectives" call for an early attention to the program's life cycle costs management through the Program's Need, Goals, and Objectives (NGO) document, which provides the vision, scope, and key areas of focus for the Program. One general policy of the Constellation Program, found in the Constellation Architecture Requirements Document (CARD), states: "A sustainable program hinges on how effectively total life cycle costs are managed. Developmental costs are a key consideration, but total life cycle costs related to the production, processing, and operation of the entire architecture must be accounted for in design decisions sufficiently to ensure future resources are available for ever more ambitious missions into the solar system....It is the intent of the Constellation Program to aggressively manage this aspect of the program using the design policies and simplicity." To respond to the Program's strong desire to manage the program life cycle costs, special efforts were established to identify operability requirements to influence flight vehicle and ground infrastructure design in order to impact the life cycle operations costs, and stretch goal requirements were introduced to the Program. This paper will describe how these stretch goal requirements were identified, developed, refined, matured, approved, and infused into the CARD. The paper will also document several challenges encountered when infusing the stretch goal requirements into the Constellation Program.

  10. Factors associated with integrating self-management support into primary care.

    PubMed

    Crespo, Richard; Shrewsberry, Molly

    2007-06-01

    The purpose of this article is to expand the understanding of self-management support by describing factors that contribute to implementing a comprehensive self-management program in primary care. Four rural health centers in medically underserved areas participated in a study to document the implementation of a self-management program. This program consisted of a social marketing plan and decision-making tools to guide patients in making self-management behavior changes. The stages of change constructs of the transtheoretical model were used to design the social marketing plan. Key informant interviews were conducted at 6-month and 9-month intervals to document the implementation process. A standardized set of questions was used in the interviews. The data from the interviews were analyzed using content analysis techniques. One of the principle findings is that self-management support requires putting a system in place, not just adding a new component to primary care. The health centers that fully implemented the self-management program made an organizational commitment to keep self-management on the agenda in management meetings, clinical staff set the example by adopting self-management behaviors, and patient self-management support was implemented in multiple patient care venues. Primary care centers with limited financial resources are able to integrate self-management support into their system of chronic illness care.

  11. 43 CFR 12.921 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Standards for financial management systems... AND AUDIT REQUIREMENTS AND COST PRINCIPLES FOR ASSISTANCE PROGRAMS Uniform Administrative Requirements... Organizations Post-Award Requirements § 12.921 Standards for financial management systems. (a) Federal awarding...

  12. Intellectual Production Supervision Perform based on RFID Smart Electricity Meter

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-03-01

    This topic develops the RFID intelligent electricity meter production supervision project management system. The system is designed for energy meter production supervision in the management of the project schedule, quality and cost information management requirements in RFID intelligent power, and provide quantitative information more comprehensive, timely and accurate for supervision engineer and project manager management decisions, and to provide technical information for the product manufacturing stage file. From the angle of scheme analysis, design, implementation and test, the system development of production supervision project management system for RFID smart meter project is discussed. Focus on the development of the system, combined with the main business application and management mode at this stage, focuses on the energy meter to monitor progress information, quality information and cost based information on RFID intelligent power management function. The paper introduces the design scheme of the system, the overall client / server architecture, client oriented graphical user interface universal, complete the supervision of project management and interactive transaction information display, the server system of realizing the main program. The system is programmed with C# language and.NET operating environment, and the client and server platforms use Windows operating system, and the database server software uses Oracle. The overall platform supports mainstream information and standards and has good scalability.

  13. LUMIS: Land Use Management and Information Systems; coordinate oriented program documentation

    NASA Technical Reports Server (NTRS)

    1976-01-01

    An integrated geographic information system to assist program managers and planning groups in metropolitan regions is presented. The series of computer software programs and procedures involved in data base construction uses the census DIME file and point-in-polygon architectures. The system is described in two parts: (1) instructions to operators with regard to digitizing and editing procedures, and (2) application of data base construction algorithms to achieve map registration, assure the topological integrity of polygon files, and tabulate land use acreages within administrative districts.

  14. A Small Business Management Entrepreneurship Curriculum: A Dual Progression Experience.

    ERIC Educational Resources Information Center

    Kuratko, Donald; LaFollette, William R.

    1986-01-01

    Describes Ball State University's "dual progression" curriculum for the small business management program. The program seeks to combine the best elements of entrepreneurial theory with the difficult facets of practical experience. The five major component courses (small business ventures, entrepreneurship, management information systems,…

  15. Professional Development through Organizational Assessment: Using APPA's Facilities Management Evaluation Program

    ERIC Educational Resources Information Center

    Medlin, E. Lander; Judd, R. Holly

    2013-01-01

    APPA's Facilities Management Evaluation Program (FMEP) provides an integrated system to optimize organizational performance. The criteria for evaluation not only provide a tool for organizational continuous improvement, they serve as a compelling leadership development tool essential for today's facilities management professional. The senior…

  16. Residuals Management and Water Pollution Control Planning.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC. Office of Public Affairs.

    This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)

  17. Program management model study

    NASA Technical Reports Server (NTRS)

    Connelly, J. J.; Russell, J. E.; Seline, J. R.; Sumner, N. R., Jr.

    1972-01-01

    Two models, a system performance model and a program assessment model, have been developed to assist NASA management in the evaluation of development alternatives for the Earth Observations Program. Two computer models were developed and demonstrated on the Goddard Space Flight Center Computer Facility. Procedures have been outlined to guide the user of the models through specific evaluation processes, and the preparation of inputs describing earth observation needs and earth observation technology. These models are intended to assist NASA in increasing the effectiveness of the overall Earth Observation Program by providing a broader view of system and program development alternatives.

  18. Distributed mixed-integer fuzzy hierarchical programming for municipal solid waste management. Part I: System identification and methodology development.

    PubMed

    Cheng, Guanhui; Huang, Guohe; Dong, Cong; Xu, Ye; Chen, Xiujuan; Chen, Jiapei

    2017-03-01

    Due to the existence of complexities of heterogeneities, hierarchy, discreteness, and interactions in municipal solid waste management (MSWM) systems such as Beijing, China, a series of socio-economic and eco-environmental problems may emerge or worsen and result in irredeemable damages in the following decades. Meanwhile, existing studies, especially ones focusing on MSWM in Beijing, could hardly reflect these complexities in system simulations and provide reliable decision support for management practices. Thus, a framework of distributed mixed-integer fuzzy hierarchical programming (DMIFHP) is developed in this study for MSWM under these complexities. Beijing is selected as a representative case. The Beijing MSWM system is comprehensively analyzed in many aspects such as socio-economic conditions, natural conditions, spatial heterogeneities, treatment facilities, and system complexities, building a solid foundation for system simulation and optimization. Correspondingly, the MSWM system in Beijing is discretized as 235 grids to reflect spatial heterogeneity. A DMIFHP model which is a nonlinear programming problem is constructed to parameterize the Beijing MSWM system. To enable scientific solving of it, a solution algorithm is proposed based on coupling of fuzzy programming and mixed-integer linear programming. Innovations and advantages of the DMIFHP framework are discussed. The optimal MSWM schemes and mechanism revelations will be discussed in another companion paper due to length limitation.

  19. 41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larsen, Barbara L.

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  2. Keeping health promotion in the pink. Documentation can show how programs contribute to hospital goals.

    PubMed

    Kernaghan, S G

    1990-01-01

    Health promotion encompasses a wide range of services, including health information, health education, wellness, and employee health programs--important efforts, but hardly life-or-death matters. So with increased pressure to put programs to an institutional "worth" test, few health promotion programs make the grade, not because they fail, but because their managers do not know how to document and demonstrate their contributions to hospital goals. The tools that can be used to track program impact range from simple hand-written record keeping on file cards to more complicated and computer-supported systems of data gathering and analysis. It is a mistake to assume that only computer-based systems can yield meaningful information. In the documentation process it may be necessary to start small, but it is necessary to start. Sound management decisions depend on practical evidence that a program is helping a hospital's operations. When one hospital implemented an employee assistance program, program managers set out to document how the program saved the hospital money, improved the work environment, and improved quality of care. At another hospital, the manager of the inpatient cardiac rehabilitation program enlisted the assistance of the medical records department to document to the hospital that patients not in the program had longer lengths of stay than program participants.

  3. Assess program: Interactive data management systems for airborne research

    NASA Technical Reports Server (NTRS)

    Munoz, R. M.; Reller, J. O., Jr.

    1974-01-01

    Two data systems were developed for use in airborne research. Both have distributed intelligence and are programmed for interactive support among computers and with human operators. The C-141 system (ADAMS) performs flight planning and telescope control functions in addition to its primary role of data acquisition; the CV-990 system (ADDAS) performs data management functions in support of many research experiments operating concurrently. Each system is arranged for maximum reliability in the first priority function, precision data acquisition.

  4. Managing System of Systems Requirements with a Requirements Screening Group

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirement’s Baseline, but also the development of all your individual requirements during a Program’s/Project’s Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration withmore » multiple requirements’ development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.« less

  5. A model for managing sources of groundwater pollution

    USGS Publications Warehouse

    Gorelick, Steven M.

    1982-01-01

    The waste disposal capacity of a groundwater system can be maximized while maintaining water quality at specified locations by using a groundwater pollutant source management model that is based upon linear programing and numerical simulation. The decision variables of the management model are solute waste disposal rates at various facilities distributed over space. A concentration response matrix is used in the management model to describe transient solute transport and is developed using the U.S. Geological Survey solute transport simulation model. The management model was applied to a complex hypothetical groundwater system. Large-scale management models were formulated as dual linear programing problems to reduce numerical difficulties and computation time. Linear programing problems were solved using a numerically stable, available code. Optimal solutions to problems with successively longer management time horizons indicated that disposal schedules at some sites are relatively independent of the number of disposal periods. Optimal waste disposal schedules exhibited pulsing rather than constant disposal rates. Sensitivity analysis using parametric linear programing showed that a sharp reduction in total waste disposal potential occurs if disposal rates at any site are increased beyond their optimal values.

  6. Computer-Based Educational Software System. Final Report.

    ERIC Educational Resources Information Center

    Brandt, Richard C.; Davis, Bradley N.

    CBESS (Computer-Based Educational Software System) is a set of 22 programs addressing authoring, instructional delivery, and instructional management. The programs are divided into five groups: (1) Computer-Based Memorization System (CBMS), which helps students acquire and maintain declarative (factual) knowledge (11 programs); (2) Language Skills…

  7. AQMAN; linear and quadratic programming matrix generator using two-dimensional ground-water flow simulation for aquifer management modeling

    USGS Publications Warehouse

    Lefkoff, L.J.; Gorelick, S.M.

    1987-01-01

    A FORTRAN-77 computer program code that helps solve a variety of aquifer management problems involving the control of groundwater hydraulics. It is intended for use with any standard mathematical programming package that uses Mathematical Programming System input format. The computer program creates the input files to be used by the optimization program. These files contain all the hydrologic information and management objectives needed to solve the management problem. Used in conjunction with a mathematical programming code, the computer program identifies the pumping or recharge strategy that achieves a user 's management objective while maintaining groundwater hydraulic conditions within desired limits. The objective may be linear or quadratic, and may involve the minimization of pumping and recharge rates or of variable pumping costs. The problem may contain constraints on groundwater heads, gradients, and velocities for a complex, transient hydrologic system. Linear superposition of solutions to the transient, two-dimensional groundwater flow equation is used by the computer program in conjunction with the response matrix optimization method. A unit stress is applied at each decision well and transient responses at all control locations are computed using a modified version of the U.S. Geological Survey two dimensional aquifer simulation model. The program also computes discounted cost coefficients for the objective function and accounts for transient aquifer conditions. (Author 's abstract)

  8. The Watershed and River Systems Management Program: Decision Support for Water- and Environmental-Resource Management

    NASA Astrophysics Data System (ADS)

    Leavesley, G.; Markstrom, S.; Frevert, D.; Fulp, T.; Zagona, E.; Viger, R.

    2004-12-01

    Increasing demands for limited fresh-water supplies, and increasing complexity of water-management issues, present the water-resource manager with the difficult task of achieving an equitable balance of water allocation among a diverse group of water users. The Watershed and River System Management Program (WARSMP) is a cooperative effort between the U.S. Geological Survey (USGS) and the Bureau of Reclamation (BOR) to develop and deploy a database-centered, decision-support system (DSS) to address these multi-objective, resource-management problems. The decision-support system couples the USGS Modular Modeling System (MMS) with the BOR RiverWare tools using a shared relational database. MMS is an integrated system of computer software that provides a research and operational framework to support the development and integration of a wide variety of hydrologic and ecosystem models, and their application to water- and ecosystem-resource management. RiverWare is an object-oriented reservoir and river-system modeling framework developed to provide tools for evaluating and applying water-allocation and management strategies. The modeling capabilities of MMS and Riverware include simulating watershed runoff, reservoir inflows, and the impacts of resource-management decisions on municipal, agricultural, and industrial water users, environmental concerns, power generation, and recreational interests. Forecasts of future climatic conditions are a key component in the application of MMS models to resource-management decisions. Forecast methods applied in MMS include a modified version of the National Weather Service's Extended Streamflow Prediction Program (ESP) and statistical downscaling from atmospheric models. The WARSMP DSS is currently operational in the Gunnison River Basin, Colorado; Yakima River Basin, Washington; Rio Grande Basin in Colorado and New Mexico; and Truckee River Basin in California and Nevada.

  9. 28 CFR 70.21 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Standards for financial management..., HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.21 Standards for financial management systems. (a) Recipients must relate financial data to...

  10. Preparing health care organizations for successful case management programs.

    PubMed

    Bonvissuto, C A; Kastens, J M; Atwell, S R

    1997-01-01

    This article reports the results of a study of four hospital-based providers in varying stages of implementing case management programs. Three of the providers had most of the necessary elements in place to ensure success, such as a mix of reimbursement sources, an effective and integrated information management system, a full range of clinical services, and continuous quality improvement programs. The authors make several suggestions for key activities that must be pursued by any health care organization seeking to implement a case management program in an era of managed care, tightening reimbursement, and consumer demand for quality care. These include the need to (a) organize essential case management functions under a centralized structure; (b) set realistic, quantifiable targets, and (c) design a communications plan for the program.

  11. Department of Education: Multiple, Nonintegrated Systems Hamper Management of Student Financial Aid Programs. Testimony before the Committee on Labor and Human Resources, U. S. Senate. Statement of Cornelia M. Blanchette, Associate Director Education and Employment Issues, Health, Education, and Human Services Division.

    ERIC Educational Resources Information Center

    Blanchette, Cornelia M.

    This statement of Cornelia M. Blanchette to the U.S. Senate Committee on Labor and Human Reources discusses Department of Education information management systems that support the financial aid programs authorized by Title IV of the Higher Education Act of 1965, as amended. These programs help the Federal Family Education Loan Program (FFELP), the…

  12. Software Quality Metrics: A Software Management Monitoring Method for Air Force Logistics Command in Its Software Quality Assurance Program for the Quantitative Assessment of the System Development Life Cycle under Configuration Management.

    DTIC Science & Technology

    1982-03-01

    pilot systems. Magnitude of the mutant error is classified as: o Program does not compute. o Program computes but does not run test data. o Program...14 Test and Integration ... ............ .. 105 15 The Mapping of SQM to the SDLC ........ ... 108 16 ADS Development .... .............. . 224 17...and funds. While the test phase concludes the normal development cycle, one should realize that with software the development continues in the

  13. Congestion management system/IVHS program study Birmingham, Alabama : phase 1, report

    DOT National Transportation Integrated Search

    1995-04-01

    The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...

  14. Congestion Management System/IVHS Program Study for Birmingham, Alabama. Phase 1 Report

    DOT National Transportation Integrated Search

    1995-04-01

    The Inter-modal Surface Transportation Efficiency Act of 1991 (ISTEA) required states and : metropolitan areas designated as transportation management areas develop congestion : management systems. The Birmingham Planning Area is designated as a non-...

  15. Planning for management information systems in drug treatment organizations.

    PubMed

    Zalkind, D; Zelon, H; Moore, M; Kaluzny, A

    1979-02-01

    An attempt to set up a management information system for individual drug abuse programs throughout a state is described. The principles upon which the system is based are discussed along with the problems encountered in its implementation. A series of guidelines for establishing management information systems in operating human services agencies is included.

  16. 43 CFR 12.60 - Standards for financial management systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Standards for financial management systems... AUDIT REQUIREMENTS AND COST PRINCIPLES FOR ASSISTANCE PROGRAMS Uniform Administrative Requirements for... Standards for financial management systems. (a) A State must expand and account for grant funds in...

  17. Prototyping with Application Generators: Lessons Learned from the Naval Aviation Logistics Command Management Information System Case

    DTIC Science & Technology

    1992-10-01

    Prototyping with Application Generators: Lessons Learned from the Naval Aviation Logistics Command Management Information System Case. This study... management information system to automate manual Naval aviation maintenance tasks-NALCOMIS. With the use of a fourth-generation programming language

  18. Annual Site Environmental Report: 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nuckolls, H.; /SLAC

    2008-02-22

    This report provides information about environmental programs during the calendar year (CY) of 2006 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year; i.e., stormwater monitoring covering the winter season of 2006/2007 (October 2006 through May 2007), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC continued to follow the path tomore » self-declare an environmental management system under DOE Order 450.1, 'Environmental Protection Program' and effectively applied environmental management in meeting the site's integrated safety and environmental management system goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that Worker safety and health are protected; The environment is protected; and Compliance is ensured. Throughout 2006, SLAC focused on these activities through the SLAC management systems. These systems were also the way SLAC approached implementing 'greening of the government' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. The SLAC Office of Assurance was created during 2006 in response to DOE Order 226.1. During 2006, there were no reportable releases to the environment from SLAC operations, and there were no Notice of Violations issued to SLAC from any of the regulatory agencies that oversee SLAC. In addition, many improvements in waste minimization, recycling, stormwater drain system, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2006 to better manage chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board, San Francisco Bay Region (RWQCB) for the investigation and remediation of impacted soil and groundwater at SLAC. The new board order lists specific tasks and deadlines for groundwater and soil remedial investigation. All 2006 submittals to the board were completed on time.« less

  19. Comprehensive managed care evaluation.

    PubMed

    Bushick, B

    1992-01-01

    To optimize the benefits of managed care delivery systems, employers must identify and reward those systems that are most efficient and effective. At the same time, their deeper involvement in system design and management exposes employers to greater potential liability. Employers thus need to better evaluate their managed care programs in order to enhance the benefits and minimize the risks.

  20. 41 CFR 102-118.275 - What must my agency consider when designing and implementing a prepayment audit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... consider when designing and implementing a prepayment audit program? 102-118.275 Section 102-118.275 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT Prepayment Audits of Transportation...

  1. 78 FR 4391 - New England Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... current management system based on days-at-sea (DAS) and trip limits. These changes may include adoption of a DAS leasing program, and in that context, the NMFS Regional Office staff will give a presentation on the DAS leasing program adopted in the Northeast Multispecies Fishery Management Plan. The...

  2. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the permit...

  3. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the permit...

  4. 36 CFR 13.934 - How will the superintendent manage the permit program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... manage the permit program? 13.934 Section 13.934 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Denali National Park and Preserve Motor Vehicle Permits § 13.934 How will the superintendent manage the permit...

  5. 78 FR 78416 - Submission for Review: Program Services Evaluation Surveys, OMB Control No. 3206-0252

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ...) leads Federal agencies in shaping human resources management systems to effectively recruit, develop... OFFICE OF PERSONNEL MANAGEMENT Submission for Review: Program Services Evaluation Surveys, OMB Control No. 3206-0252 AGENCY: U.S. Office of Personnel Management. ACTION: 60-Day Notice and request for...

  6. An Analysis of the Navy’s Selective Reenlistment Bonus (SRB) Management System and ROGER Model

    DTIC Science & Technology

    2008-03-01

    SRBMS Selective Reenlistment Bonus Management System STAR Selective Training and Reenlistment Program YOS Years of Service 4YO 4-Year Obligor 5YO...it includes 4-year obligors ( 4YO ) sailors who will reach the end of active obligated service (EAOS) during the fiscal year of the SRB program, as

  7. Teaching Management Information Systems as a General Education Requirement (GER) Capstone

    ERIC Educational Resources Information Center

    Hoanca, Bogdan

    2012-01-01

    Although many IS programs nationwide use capstone courses in the major, this paper reports on the use of an upper division Management Information Systems (MIS) class as a general education requirements (GER) capstone. The class is a core requirement for all majors in the Bachelor of Business Administration (BBA) program at the University of Alaska…

  8. Research on Building Education & Workforce Capacity in Systems Engineering

    DTIC Science & Technology

    2012-09-30

    Science Coast Guard Academy Chris Lund, Research Engineer USCG R&D center Civil Engineering Coast Guard Academy Scot T. Tripp, Program Manager USCG...74 researchers Coast Guard Academy Scot T. Tripp, Program Manager Internal institutional USCG R&D center... Woods Industry Lockheed Martin Aeronautics Company Defense contracted system development and analysis Stevens Tom Newby Industry Buro

  9. Visual management support system

    Treesearch

    Lee Anderson; Jerry Mosier; Geoffrey Chandler

    1979-01-01

    The Visual Management Support System (VMSS) is an extension of an existing computer program called VIEWIT, which has been extensively used by the U. S. Forest Service. The capabilities of this program lie in the rapid manipulation of large amounts of data, specifically opera-ting as a tool to overlay or merge one set of data with another. VMSS was conceived to...

  10. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  11. ADP SYSTEMS ANALYSIS - COMMITTED VS. AVAILABLE MILITARY TRANSPORTATION (LMI T1).

    DTIC Science & Technology

    LOGISTICS , * MANAGEMENT ENGINEERING), (*DATA PROCESSING, LOGISTICS), INFORMATION RETRIEVAL, SYSTEMS ENGINEERING, MILITARY TRANSPORTATION, CARGO VEHICLES, SCHEDULING, COMPUTER PROGRAMMING, MANAGEMENT PLANNING AND CONTROL

  12. Unisys' experience in software quality and productivity management of an existing system

    NASA Technical Reports Server (NTRS)

    Munson, John B.

    1988-01-01

    A summary of Quality Improvement techniques, implementation, and results in the maintenance, management, and modification of large software systems for the Space Shuttle Program's ground-based systems is provided.

  13. Information Technology in Sport Management Curricula

    ERIC Educational Resources Information Center

    Barneva, Reneta P.; Hite, Penny D.

    2017-01-01

    We study the breadth of inclusion of information technology in sport management (SM) programs, surveying program sponsoring colleges and universities within a prominent state-university system. Our results indicate a very low number of SM programs require any type of information technology courses as part of their core requirements. In fact, only…

  14. 77 FR 55371 - System Safety Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ...-based rule and FRA seeks comments on all aspects of the proposed rule. An SSP would be implemented by a... SSP would be the risk-based hazard management program and risk-based hazard analysis. A properly implemented risk-based hazard management program and risk-based hazard analysis would identify the hazards and...

  15. Linear Programming for Vocational Education Planning. Interim Report.

    ERIC Educational Resources Information Center

    Young, Robert C.; And Others

    The purpose of the paper is to define for potential users of vocational education management information systems a quantitative analysis technique and its utilization to facilitate more effective planning of vocational education programs. Defining linear programming (LP) as a management technique used to solve complex resource allocation problems…

  16. Commentary: Medicaid reform issues affecting the Indian health care system.

    PubMed Central

    Wellever, A; Hill, G; Casey, M

    1998-01-01

    Substantial numbers of Indian people rely on Medicaid for their primary health insurance coverage. When state Medicaid programs enroll Indians in managed care programs, several unintended consequences may ensue. This paper identifies some of the perverse consequences of Medicaid reform for Indians and the Indian health care system and suggests strategies for overcoming them. It discusses the desire of Indian people to receive culturally appropriate services, the need to maintain or improve Indian health care system funding, and the duty of state governments to respect tribal sovereignty. Because of their relatively small numbers, Indians may be treated differently under Medicaid managed care systems without significantly endangering anticipated program savings. Failure of Medicaid programs to recognize the uniqueness of Indian people, however, may severely weaken the Indian health care system. PMID:9491006

  17. Acquisition Management for System of Systems: Affordability through Effective Portfolio Management

    DTIC Science & Technology

    2013-04-01

    the management of strategic “ portfolios of systems” in military acquisitions; this includes application of Real Options (RO) theory and metrics such...Affordability Through Effective Portfolio Management Navindran Davendralingam and Daniel DeLaurentis Purdue University Published April 1, 2013...Systems: Affordability Through Effective Portfolio Management 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d

  18. Making Technology Ready: Integrated Systems Health Management

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  19. MQ-9 Reaper Unmanned Aircraft System (MQ-9 Reaper)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-424 MQ-9 Reaper Unmanned Aircraft System (MQ-9 Reaper) As of FY 2017 President’s Budget...Defense Acquisition Management Information Retrieval (DAMIR) March 23, 2016 16:18:05 UNCLASSIFIED MQ-9 Reaper December 2015 SAR March 23, 2016 16:18:05...2015 SAR March 23, 2016 16:18:05 UNCLASSIFIED 3 PB - President’s Budget PE - Program Element PEO - Program Executive Officer PM - Program Manager

  20. Management System for Integrating Basic Skills 2 Training and Unit Training Programs

    DTIC Science & Technology

    1983-09-01

    Social Sciences. NOTEs The findings in this report are not to be construed as en official Department of the Army position, unless so designated by other...This report describes methods used and results obtained in the design , development, and field test of a management system and curriculum components...for integrating the Army’s Basic Skills Education Program, Phase II (BSEP II) and unit training programs. The curriculum components are designed to

Top