An Approach for Implementation of Project Management Information Systems
NASA Astrophysics Data System (ADS)
Běrziša, Solvita; Grabis, Jānis
Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.
United States Army Medical Materiel Development Activity: 1997 Annual Report.
1997-01-01
business planning and execution information management system (Project Management Division Database ( PMDD ) and Product Management Database System (PMDS...MANAGEMENT • Project Management Division Database ( PMDD ), Product Management Database System (PMDS), and Special Users Database System:The existing...System (FMS), were investigated. New Product Managers and Project Managers were added into PMDS and PMDD . A separate division, Support, was
The integrated scheduling system: A case study in project management
NASA Technical Reports Server (NTRS)
Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.
1989-01-01
A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.
Program and Project Management Framework
NASA Technical Reports Server (NTRS)
Butler, Cassandra D.
2002-01-01
The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.
Project Management in NASA: The system and the men
NASA Technical Reports Server (NTRS)
Pontious, R. H.; Barnes, L. B.
1973-01-01
An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.
A Symbiosis between Instructional Systems Design and Project Management
ERIC Educational Resources Information Center
Pan, Cheng-Chang
2012-01-01
This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…
Utilization of Information Provided by the Wisconsin Management System.
ERIC Educational Resources Information Center
Rossmiller, Richard A.
The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…
NICA project management information system
NASA Astrophysics Data System (ADS)
Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.
2016-09-01
The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.
ERIC Educational Resources Information Center
Rodriguez, Jacinto
2013-01-01
This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…
I-15 integrated corridor management system : project management plan.
DOT National Transportation Integrated Search
2011-06-01
The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...
Application of expert systems in project management decision aiding
NASA Technical Reports Server (NTRS)
Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David
1987-01-01
The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.
Requirements management: keeping your technology acquisition project under control.
Carr, J J
2000-03-01
Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.
Agile Systems Engineering-Kanban Scheduling Subsection
2017-03-10
including both online and standalone versions. RESEARCH GOALS The overall Agile SE Management Project research goals are to: 1. Identify agile...March 10, 2017 5 Establish a better technical project management and... Project Management ,” Master of Science Project , Stevens Institute, to be completed in May, 2017. • Smith, Jeffrey, “System of Systems Task
Intellectual Production Supervision Perform based on RFID Smart Electricity Meter
NASA Astrophysics Data System (ADS)
Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng
2018-03-01
This topic develops the RFID intelligent electricity meter production supervision project management system. The system is designed for energy meter production supervision in the management of the project schedule, quality and cost information management requirements in RFID intelligent power, and provide quantitative information more comprehensive, timely and accurate for supervision engineer and project manager management decisions, and to provide technical information for the product manufacturing stage file. From the angle of scheme analysis, design, implementation and test, the system development of production supervision project management system for RFID smart meter project is discussed. Focus on the development of the system, combined with the main business application and management mode at this stage, focuses on the energy meter to monitor progress information, quality information and cost based information on RFID intelligent power management function. The paper introduces the design scheme of the system, the overall client / server architecture, client oriented graphical user interface universal, complete the supervision of project management and interactive transaction information display, the server system of realizing the main program. The system is programmed with C# language and.NET operating environment, and the client and server platforms use Windows operating system, and the database server software uses Oracle. The overall platform supports mainstream information and standards and has good scalability.
Management of major system programs and projects. Handbook
NASA Technical Reports Server (NTRS)
1993-01-01
This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.
Astronomical large projects managed with MANATEE: management tool for effective engineering
NASA Astrophysics Data System (ADS)
García-Vargas, M. L.; Mujica-Alvarez, E.; Pérez-Calpena, A.
2012-09-01
This paper describes MANATEE, which is the Management project web tool developed by FRACTAL, specifically designed for managing large astronomical projects. MANATEE facilitates the management by providing an overall view of the project and the capabilities to control the three main projects parameters: scope, schedule and budget. MANATEE is one of the three tools of the FRACTAL System & Project Suite, which is composed also by GECO (System Engineering Tool) and DOCMA (Documentation Management Tool). These tools are especially suited for those Consortia and teams collaborating in a multi-discipline, complex project in a geographically distributed environment. Our Management view has been applied successfully in several projects and currently is being used for Managing MEGARA, the next instrument for the GTC 10m telescope.
Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2010-12-01
The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...
Project Management Using Modern Guidance, Navigation and Control Theory
NASA Technical Reports Server (NTRS)
Hill, Terry R.
2011-01-01
Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.
Including information technology project management in the nursing informatics curriculum.
Sockolow, Paulina; Bowles, Kathryn H
2008-01-01
Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.
Solid waste information and tracking system server conversion project management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY, D.L.
1999-04-12
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.
Finance and supply management project execution plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BENNION, S.I.
As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.
Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory
NASA Astrophysics Data System (ADS)
Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi
Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.
NASA Technical Reports Server (NTRS)
Koenig, John C.; Billitti, Joseph W.; Tallon, John M.
1979-01-01
Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).
Managing Programmatic Risk for Complex Space System Developments
NASA Technical Reports Server (NTRS)
Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)
2001-01-01
Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.
ERIC Educational Resources Information Center
Baird, Aaron; Riggins, Frederick J.
2012-01-01
An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…
48 CFR 1301.671 - Assignment of program and project managers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...
VHBuild.com: A Web-Based System for Managing Knowledge in Projects.
ERIC Educational Resources Information Center
Li, Heng; Tang, Sandy; Man, K. F.; Love, Peter E. D.
2002-01-01
Describes an intelligent Web-based construction project management system called VHBuild.com which integrates project management, knowledge management, and artificial intelligence technologies. Highlights include an information flow model; time-cost optimization based on genetic algorithms; rule-based drawing interpretation; and a case-based…
Improving System Engineering Excellence at NASA's Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Takada, Pamela Wallace; Newton, Steve; Gholston, Sampson; Thomas, Dale (Technical Monitor)
2001-01-01
NASA's Marshall Space Flight Center (MSFC) management feels that sound system engineering practices are essential for successful project management, NASA studies have concluded that recent project failures could be attributed in part to inadequate systems engineering. A recent survey of MSFC project managers and system engineers' resulted in the recognition of a need for training in Systems Engineering Practices, particularly as they relate to MSFC projects. In response to this survey, an internal pilot short-course was developed to reinforce accepted practices for system engineering at MSFC. The desire of the MSFC management is to begin with in-house training and offer additional educational opportunities to reinforce sound system engineering principles to the more than 800 professionals who are involved with system engineering and project management. A Systems Engineering Development Plan (SEDP) has been developed to address the longer-term systems engineering development needs of MSFC. This paper describes the survey conducted and the training course that was developed in response to that survey.
Design, implementation and migration of security systems as an extreme project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scharmer, Carol; Trujillo, David
2010-08-01
Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocatedmore » based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.« less
Design implementation and migration of security systems as an extreme project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scharmer, Carol
2010-10-01
Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocatedmore » based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.« less
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Managemant of NASA's major projects
NASA Technical Reports Server (NTRS)
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
Microgrid Controls | Grid Modernization | NREL
Systems Integration Facility. Microgrid Controller Interaction with Distribution Management Systems This project investigates the interaction of distribution management systems with local controllers, including microgrid controllers. The project is developing integrated control and management systems for distribution
Center for Ground Vehicle Development and Integration
2011-04-22
UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations
Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta
2014-04-01
The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... Management Demonstration Project for TRICARE Standard Beneficiaries AGENCY: Department of Defense. ACTION: Notice of Two-Year Continuation of Disease Management Demonstration Project for TRICARE Standard... System (MHS) demonstration project entitled ``Disease Management Demonstration Project for TRICARE...
48 CFR 301.607 - Certification of Program and Project Managers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Certification of Program and Project Managers. 301.607 Section 301.607 Federal Acquisition Regulations System HEALTH AND HUMAN... Responsibilities 301.607 Certification of Program and Project Managers. ...
Advancing the practice of systems engineering at JPL
NASA Technical Reports Server (NTRS)
Jansma, Patti A.; Jones, Ross M.
2006-01-01
In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.
City of Fort Collins advanced traffic management system : final report
DOT National Transportation Integrated Search
2009-01-01
The Fort Collins Advance Traffic Management System (ATMS) was a FY01 earmarked project. The objective of the overall project was to rebuild the Citys entire traffic management system to utilize and provide Intelligent Transportation System (ITS) c...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bonnal, P.; Féral, B.; Kershaw, K.
Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies andmore » development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.« less
Case Study on Project Risk Management Planning Based on Soft System Methodology
NASA Astrophysics Data System (ADS)
Lifang, Xie; Jun, Li
This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.
1984-08-01
4 MOSQUITO INFORMATION MANAGEMENT PROJECT (MIMP): *APPLICATION OF A COMPUTERIZED GENERAL PURPOSE I INFORMATION MANAGEMENT SYSTEM (SELGEM) TO...1983 to August 1984 INFORMATION MANAGEMENT SYSTEM (SELGEM) TO MEDI- 6 EFRIGOG EOTNME * CALLY IMPORTANT ARTHROPODS (DIPTERA: CULICIDAE) .v PEnRMN OG
Transportation engineering project management : survey of practice.
DOT National Transportation Integrated Search
2017-01-01
Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...
Using electronic document management systems to manage highway project files.
DOT National Transportation Integrated Search
2011-12-12
"WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"
Project management techniques for highly integrated programs
NASA Technical Reports Server (NTRS)
Stewart, J. F.; Bauer, C. A.
1983-01-01
The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.
NASA Advanced Life Support Technology Testing and Development
NASA Technical Reports Server (NTRS)
Wheeler, Raymond M.
2012-01-01
Prior to 2010, NASA's advanced life support research and development was carried out primarily under the Exploration Life Support Project of NASA's Exploration Systems Mission Directorate. In 2011, the Exploration Life Support Project was merged with other projects covering Fire Prevention/Suppression, Radiation Protection, Advanced Environmental Monitoring and Control, and Thermal Control Systems. This consolidated project was called Life Support and Habitation Systems, which was managed under the Exploration Systems Mission Directorate. In 2012, NASA re-organized major directorates within the agency, which eliminated the Exploration Systems Mission Directorate and created the Office of the Chief Technologist (OCT). Life support research and development is currently conducted within the Office of the Chief Technologist, under the Next Generation Life Support Project, and within the Human Exploration Operation Missions Directorate under several Advanced Exploration System projects. These Advanced Exploration Systems projects include various themes of life support technology testing, including atmospheric management, water management, logistics and waste management, and habitation systems. Food crop testing is currently conducted as part of the Deep Space Habitation (DSH) project within the Advanced Exploration Systems Program. This testing is focused on growing salad crops that could supplement the crew's diet during near term missions.
The intelligent user interface for NASA's advanced information management systems
NASA Technical Reports Server (NTRS)
Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.
1987-01-01
NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.
Reengineering outcomes management: an integrated approach to managing data, systems, and processes.
Neuman, K; Malloch, K; Ruetten, V
1999-01-01
The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.
Implementation of a Project Management Office (PMO)--experiences from year 1.
Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann
2006-01-01
Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.
Computer Aided Management for Information Processing Projects.
ERIC Educational Resources Information Center
Akman, Ibrahim; Kocamustafaogullari, Kemal
1995-01-01
Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
NASA Astrophysics Data System (ADS)
Pérez-Calpena, A.; Mujica-Alvarez, E.; Osinde-Lopez, J.; García-Vargas, M.
2008-07-01
This paper describes the FRACTAL Systems & Projects suite. This suite is composed by several tools (GECO, DOCMA and SUMO) that provide the capabilities that all organizations need to store and manage the system information generated along the project's lifetime, from the design phase to the operation phase. The amount of information that is generated in a project keeps growing in size and complexity along the project's lifetime, to an extent that it becomes impossible to manage it without the aid of specific computer-based tools. The suite described in this paper is the solution developed by FRACTAL to assist the execution of different scientific projects, mainly related with telescopes and instruments, for astronomical research centres. These tools help the system and project engineers to maintain the technical control of the systems and to ensure an optimal use of the resources. GECO eases the control of the system configuration data; DOCMA provides the means to organise and manage the documents generated in the project; SUMO allows managing and scheduling the operation, the maintenance activities and the resources during the operational phase of a system. These tools improve the project communication making the information available to the authorized users (project team, customers, Consortium's members, etc). Finally and depending on the project needs, these three tools can be used integrated or in an independent manner.
NASA Technical Reports Server (NTRS)
Jr., R. F. Miles
1995-01-01
Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.
A project management system for the X-29A flight test program
NASA Technical Reports Server (NTRS)
Stewart, J. F.; Bauer, C. A.
1983-01-01
The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.
Cost/Schedule Control Systems Criteria: A Reference Guide to C/SCSC information
1992-09-01
Smith, Larry A. "Mainframe ARTEMIS: More than a Project Management Tool -- Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988...A. "Mainframe ARTEMIS: More than a Project Management Tool - Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988). 14...than a Project Management Tool -- Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988). 17. Trufant, Thomas M. and Robert
DOT National Transportation Integrated Search
2000-03-01
Procurement of Intelligent Transportation System (ITS) projects using Federal-aid funds can present challenges that are not typically observed in traditional transportation projects. Many roadway improvement projects involve the two-step "Design-Bid-...
NASA Technical Reports Server (NTRS)
1979-01-01
Contents: project plan summary; project and mission objectives; related studies and technology support activities; technical summary; management; procurement approach; project definition items and schedule; resources; management review; controlled items; and safety, reliability, and quality assurance.
Risk Management Model in Surface Exploitation of Mineral Deposits
NASA Astrophysics Data System (ADS)
Stojanović, Cvjetko
2016-06-01
Risk management is an integrative part of all types of project management. One of the main tasks of pre-investment studies and other project documentation is the tendency to protect investment projects as much as possible against investment risks. Therefore, the provision and regulation of risk information ensure the identification of the probability of the emergence of adverse events, their forms, causes and consequences, and provides a timely measures of protection against risks. This means that risk management involves a set of management methods and techniques used to reduce the possibility of realizing the adverse events and consequences and thus increase the possibilities of achieving the planned results with minimal losses. Investment in mining projects are of capital importance because they are very complex projects, therefore being very risky, because of the influence of internal and external factors and limitations arising from the socio-economic environment. Due to the lack of a risk management system, numerous organizations worldwide have suffered significant financial losses. Therefore, it is necessary for any organization to establish a risk management system as a structural element of system management system as a whole. This paper presents an approach to a Risk management model in the project of opening a surface coal mine, developed based on studies of extensive scientific literature and personal experiences of the author, and which, with certain modifications, may find use for any investment project, both in the mining industry as well as in investment projects in other areas.
ERIC Educational Resources Information Center
Narayanaswamy, Ravi
2009-01-01
The failure rate of information systems development (ISD) projects continues to pose a big challenge for organizations. The success rate of ISD projects is less then forty percent. Factors such as disagreements and miscommunications among project manager and team members, poor monitoring and intermediary problems contribute to project failure.…
Operations system administration plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources,more » Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.« less
NASA Astrophysics Data System (ADS)
Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.
2017-12-01
In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.
An IS Project Management Course Project
ERIC Educational Resources Information Center
Frank, Ronald L.
2010-01-01
Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…
POLARIS: Helping Managers Get Answers Fast!
NASA Technical Reports Server (NTRS)
Corcoran, Patricia M.; Webster, Jeffery
2007-01-01
This viewgraph presentation reviews the Project Online Library and Resource Information System (POLARIS) system. It is NASA-wide, web-based system, providing access to information related to Program and Project Management. It will provide a one-stop shop for access to: a searchable, sortable database of all requirements for all product lines, project life cycle diagrams with reviews, project life cycle diagrams with reviews, project review definitions with products review information from NPR 7123.1, NASA Systems Engineering Processes and Requirements, templates and examples of products, project standard WBSs with dictionaries, and requirements for implementation and approval, information from NASA s Metadata Manager (MdM): Attributes of Missions, Themes, Programs & Projects, NPR7120.5 waiver form and instructions and much more. The presentation reviews the plans and timelines for future revisions and modifications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama
2007-07-01
NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less
DOT National Transportation Integrated Search
1997-01-01
Prepared ca. 1997. The Configuration Management Plan (CMP) provides configuration management instructions and guidance for the Vessel Traffic Service (VTS) system of the Ports and Waterways Safety System (PAWSS) project. The CMP describes in detail t...
Disease management projects and the Chronic Care Model in action: baseline qualitative research.
Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland
2012-05-11
Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served as travel guides, assisting and overseeing the programs as they traveled from the global plans to local actions. Project leaders, while hypothetically in control of the programs, in fact shared control of the traveling of the programs with patients, clinicians, and outside consultants. From this work, we can learn what roadblocks and expenses occur while a technology travels, from a project leader's point of view.
ERIC Educational Resources Information Center
Council of the Great City Schools, Washington, DC.
This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…
Economic analysis of transmission line engineering based on industrial engineering
NASA Astrophysics Data System (ADS)
Li, Yixuan
2017-05-01
The modern industrial engineering is applied to the technical analysis and cost analysis of power transmission and transformation engineering. It can effectively reduce the cost of investment. First, the power transmission project is economically analyzed. Based on the feasibility study of power transmission and transformation project investment, the proposal on the company system cost management is put forward through the economic analysis of the effect of the system. The cost management system is optimized. Then, through the cost analysis of power transmission and transformation project, the new situation caused by the cost of construction is found. It is of guiding significance to further improve the cost management of power transmission and transformation project. Finally, according to the present situation of current power transmission project cost management, concrete measures to reduce the cost of power transmission project are given from the two aspects of system optimization and technology optimization.
Development of high-rise buildings: digitalization of life cycle management
NASA Astrophysics Data System (ADS)
Gusakova, Elena
2018-03-01
The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.
Stahl, Olivier; Duvergey, Hugo; Guille, Arnaud; Blondin, Fanny; Vecchio, Alexandre Del; Finetti, Pascal; Granjeaud, Samuel; Vigy, Oana; Bidaut, Ghislain
2013-06-06
With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. We developed Djeen (Database for Joomla!'s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group.Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material.
2013-01-01
Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665
Advanced Air Transportation Technologies Project, Final Document Collection
NASA Technical Reports Server (NTRS)
Mogford, Richard H.; Wold, Sheryl (Editor)
2008-01-01
This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.
Application of Project Portfolio Management
NASA Astrophysics Data System (ADS)
Pankowska, Malgorzata
The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.
A Data Management System for Multi-Phase Case-Control Studies
Gibeau, Joanne M.; Steinfeldt, Lois C.; Stine, Mark J.; Tullis, Katherine V.; Lynch, H. Keith
1983-01-01
The design of a computerized system for the management of data in multi-phase epidemiologic case-control studies is described. Typical study phases include case-control selection, abstracting of data from medical records, and interview of study subjects or next of kin. In consultation with project personnel, requirements for the system were established: integration of data from all study phases into one data base, accurate follow-up of subjects through the study, sophisticated data editing capabilities, ready accessibility of specified programs to project personnel, and generation of current status and exception reports for project managment. SIR (Scientific Information Retrieval), a commercially available data base management system, was selected as the foundation of this system. The system forms a comprehensive data management system applicable to many types of public health research studies.
Disease management projects and the Chronic Care Model in action: baseline qualitative research
2012-01-01
Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. Conclusions At the sites, project leaders served as travel guides, assisting and overseeing the programs as they traveled from the global plans to local actions. Project leaders, while hypothetically in control of the programs, in fact shared control of the traveling of the programs with patients, clinicians, and outside consultants. From this work, we can learn what roadblocks and expenses occur while a technology travels, from a project leader’s point of view. PMID:22578251
Project management; considerations for success.
Maas, Jos
2013-01-01
During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
ERIC Educational Resources Information Center
Cummings, C. Peter; Cook, Desmond L.
This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…
Strategic Project Management at the NASA Kennedy Space Center
NASA Technical Reports Server (NTRS)
Lavelle, Jerome P.
2000-01-01
This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.
Modeling support for Alabama MPOs
DOT National Transportation Integrated Search
2010-07-29
The Fort Collins Advance Traffic Management System (ATMS) was a FY01 earmarked project. The objective of the overall project was to rebuild the City's entire traffic management system to utilize and provide Intelligent Transportation System (ITS) cap...
Understanding the Manager of the Project Front-End
NASA Technical Reports Server (NTRS)
Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)
2000-01-01
Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.
NASA Astrophysics Data System (ADS)
Sasidhar, Jaladanki; Muthu, D.; Venkatasubramanian, C.; Ramakrishnan, K.
2017-07-01
The success of any construction project will depend on efficient management of resources in a perfect manner to complete the project with a reasonable budget and time and the quality cannot be compromised. The efficient and timely procurement of material, deployment of adequate labor at correct time and mobilization of machinery lacking in time, all of them causes delay, lack of quality and finally affect the project cost. It is known factor that Project cost can be controlled by taking corrective actions on mobilization of resources at a right time. This research focuses on integration of management systems with the computer to generate the model which uses OOM data structure which decides to include automatic commodity code generation, automatic takeoff execution, intelligent purchase order generation, and components of design and schedule integration to overcome the problems of stock out. To overcome the problem in equipment management system inventory management module is suggested and the data set of equipment registration number, equipment number, description, date of purchase, manufacturer, equipment price, market value, life of equipment, production data of the equipment which includes equipment number, date, name of the job, hourly rate, insurance, depreciation cost of the equipment, taxes, storage cost, interest, oil, grease, and fuel consumption, etc. is analyzed and the decision support systems to overcome the problem arising out improper management is generated. The problem on labor is managed using scheduling, Strategic management of human resources. From the generated support systems tool, the resources are mobilized at a right time and help the project manager to finish project in time and thereby save the abnormal project cost and also provides the percentage that can be improved and also research focuses on determining the percentage of delays that are caused by lack of management of materials, manpower and machinery in different types of projects and how the percentage various from project to project.
NHEXAS PHASE I MARYLAND STUDY--QUALITY SYSTEMS AND IMPLEMENTATION PLAN (HSPH QSIP)
This document describes the project design and quality systems used by the Maryland Study for NHEXAS Phase 1. It contains the following sections: Project Planning and Organization, Project Implementation Plan, Data Acquisition and Management, Records Usage and Management, Routin...
Applications for improved inventory management for public transit systems
DOT National Transportation Integrated Search
2001-01-01
This report documents and presents the results of a Testing and Demonstration (T&D) Project on applications for improved inventory management for public transit systems. This project is a follow-up to an earlier study on inventory management for bus ...
Pueblo Freeway Management System (FMS) : final report
DOT National Transportation Integrated Search
2005-05-16
The Pueblo Freeway Management System (FMS) was a FY00 earmarked project. The objective of the project was to enable the Colorado State Patrol (CSP), the City of Pueblo Police Department (PPD), and CDOT (both Region 2 and Colorado Traffic Management C...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lockwood, Jr., Neil; McLellan, Jason G; Crossley, Brian
The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managersmore » to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.« less
Crawler Acquisition and Testing Demonstration Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
DEFIGH-PRICE, C.
2000-10-23
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less
Status of Project Management Education in Pakistan
ERIC Educational Resources Information Center
Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad
2009-01-01
Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…
Technical support plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The PassPort (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, and Purchasing. The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources, Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HAND1 2000 Project, is referred to asmore » Business Management System (BMS) and Chemical Management.« less
Murchison project organization and control. [North Sea
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lauzen, P.K.; Hall, J.N.
This paper describes the project management organization and the management control systems used for Conoco's Murchison field development in the North Sea. These systems created for Murchison proved largely successful and have been enhanced for use during the Hutton field development. Management concepts are described in the context of the cost control system.
Engineering data management: Experience and projections
NASA Technical Reports Server (NTRS)
Jefferson, D. K.; Thomson, B.
1978-01-01
Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.
Introduction to SIMRAND: Simulation of research and development project
NASA Technical Reports Server (NTRS)
Miles, R. F., Jr.
1982-01-01
SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.
Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew
2017-01-01
An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research community. It is freely available under the GNU GPL v3 licence and can be accessed from, https://muccg.github.io/mastr-ms/.
Open Innovation and the Erosion of the Traditional Information Systems Project's Boundaries
NASA Astrophysics Data System (ADS)
Elbanna, Amany
This paper examines the notion of open innovation and its implication on information systems management. It investigates a project of an enterprise resource planning system implementation in an international organization to unravel the resemblance with the open innovation model. The study shows that the conceptualization of ERP project as an open innovation could reveal the complex architecture of today's organization from which the ERP project cannot be isolated. It argues that the traditional boundaries around IS projects are dissolving and the relationship between what used to be outside and what used to be inside the project is increasingly blurred. The study calls for a different perspective of project management that goes beyond single and multiple project management to scan the open space of innovation and actively look for partners, competitors, and collaborators.
[Requirements for the successful installation of an data management system].
Benson, M; Junger, A; Quinzio, L; Hempelmann, G
2002-08-01
Due to increasing requirements on medical documentation, especially with reference to the German Social Law binding towards quality management and introducing a new billing system (DRGs), an increasing number of departments consider to implement a patient data management system (PDMS). The installation should be professionally planned as a project in order to insure and complete a successful installation. The following aspects are essential: composition of the project group, definition of goals, finance, networking, space considerations, hardware, software, configuration, education and support. Project and finance planning must be prepared before beginning the project and the project process must be constantly evaluated. In selecting the software, certain characteristics should be considered: use of standards, configurability, intercommunicability and modularity. Our experience has taught us that vaguely defined goals, insufficient project planning and the existing management culture are responsible for the failure of PDMS installations. The software used tends to play a less important role.
[Practical implementation of a quality management system in a radiological department].
Huber, S; Zech, C J
2011-10-01
This article describes the architecture of a project aiming to implement a DIN EN ISO 9001 quality management system in a radiological department. It is intended to be a practical guide to demonstrate each step of the project leading to certification of the system. In a planning phase resources for the implementation of the project have to be identified and a quality management (QM) group as core team has to be formed. In the first project phase all available documents have to be checked and compiled in the QM manual. Moreover all relevant processes of the department have to be described in so-called process descriptions. In a second step responsibilities for the project are identified. Customer and employee surveys have to be carried out and a nonconformity management system has to be implemented. In this phase internal audits are also needed to check the new QM system, which is finally tested in the external certification audit with reference to its conformity with the standards.
The Middle Eastern Regional Irrigation Management Information Systems project-update
USDA-ARS?s Scientific Manuscript database
The Middle Eastern Regional Irrigation Management Information Systems Project (MERIMIS) was formulated at a meeting of experts from the region in Jordan in 2003. Funded by the U.S. Department of State, it is a cooperative regional project bringing together participants from Israel, Jordan, Palestini...
NASA Technical Reports Server (NTRS)
Vaccaro, M. J.
1973-01-01
The application of the NASA type management approach to achieve objectives in other fields is considered. The NASA management outlook and the influences of the NASA environment are discussed along with project organization and management, and applications to socio-economic projects.
Continuous Risk Management at NASA
NASA Technical Reports Server (NTRS)
Hammer, Theodore F.; Rosenberg, Linda
1999-01-01
NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.
2017 TRIAD Small Business Advisory Panel
2017-10-11
government service in 2007 as the Science & Technology (S&T) Project Manager for the United States Navy’s Unmanned Maritime Systems Program Office...National Renewable Energy Laboratory (NREL) as a Program Manager for over 110 energy and water projects on military installations. He worked... management , project management , program management , donor relation service, contract and subcontract policy development and implementation, data integrity
Management evolution in the LSST project
NASA Astrophysics Data System (ADS)
Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine
2010-07-01
The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.
A CMMI-based approach for medical software project life cycle study.
Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi
2013-01-01
In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.
Assessment of the DSE 40mm Grenades
2013-08-22
on July 3, 2013, announced the sale of its assets to their competitor, AMTEC Corp, Janesville, Wisconsin. Because of these events, Project Manager...sale of its assets to AMTEC Corp. Project Manager, Maneuver Ammunition Systems and the Army Contracting Command are working with both contractors on...the novation of the DSE, Inc. contract to name AMTEC Corp as the successor on the contract. Project Manager, Maneuver Ammunition Systems needs to
Building Excellence in Project Execution: Integrated Project Management
2015-04-30
challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as
A Three Cohort Study of Role-Play Instruction for Agile Project Management
ERIC Educational Resources Information Center
Schmitz, Kurt
2018-01-01
Agile Project Management methods and processes that emphasize action and feedback over planning continue to gain prominence for Information Systems projects. This topic is an ideal candidate to lead the evolution of project management instruction from teaching "about" to learning "how to." This paper describes a role-play…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hobbs, R.E.
In large facilities, successful energy management cannot be measured by a few projects, no matter how significant the energy savings. Large facilities today are comprised of extensive energy consuming systems. For every energy project developed, two more projects remain to be discovered. The successful energy manager is one who has completed ten projects, or twenty, or thirty, and is still finding more projects to do. Nothing is assumed to be as efficient as possible, and no part of any system is ignored. The successful energy manager is willing to take risks, not of being fired, but to use imagination, studymore » engineering theory, exercise common sense, develop concept designs, calculate savings, sell projects to management, control designers, study equipment performance, pre-select contractors, manage the contractor efforts, solve inherent problems along the way, and then optimize the project after acceptance when the designers and contractors all walk off. Once the successful energy manager establishes his credibility, his problem becomes finding enough time to get the projects rolling as he dreams them up. He sees what others do not. As they say in the North, only the lead dog sees new scenery.« less
NASA Technical Reports Server (NTRS)
Johnson, Paul W.
2008-01-01
ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.
Implementing Earned Value Management in the CxP EVA Systems Project Office
NASA Technical Reports Server (NTRS)
Sorge, Les L.
2009-01-01
Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.
US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2010-12-01
This document is intended as a listing and discussion of the Requirements for the US-75 Integrated Corridor Management System (ICMS) Demonstration Project in Dallas. This document describes what the system is to do (the functional requirements), how ...
Towards Better Student Tracking Systems.
ERIC Educational Resources Information Center
Further Education Development Agency, London (England).
The Further Education (FE) sector in the United Kingdom has devoted time, energy, and resources in recent years to the development and improvement of information systems known as management-information systems. This report presents the findings of a research project on the use of management-information systems in student tracking. The project was…
Dryden Flight Research Center Critical Chain Project Management Implementation
NASA Technical Reports Server (NTRS)
Hines, Dennis O.
2012-01-01
In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burgard, K.G.
This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less
2014-04-01
All Hazards Risk Assessment Transition Project : Report on Capability Assessment Management System (CAMS) Automation...Prepared by: George Giroux Computer Applications Specialist Modis155 Queen Street, Suite 1206 Ottawa, ON K1P 6L1 Contract # THS 2335474-2 Project ...Under a Canadian Safety and Security Program (CSSP) targeted investigation (TI) project (CSSP-2012-TI- 1108), Defence Research and Development
Strengthening the management of ESA - the Inter-Directorate Reform of Corporate and Risk Management
NASA Astrophysics Data System (ADS)
Feustel-Büechl, Jörg; Arend, Harald; Derio, Eric; Infante, Giovanni; Kreiner, Gerhard; Phaler, Jesse; Tabbert, Michael
2007-02-01
ESA has undertaken the Inter-Directorate Reform of Corporate and Risk Management to strengthen the Agency's internal operations. The reform was completed at the end of 2006, encompassing five dedicated projects on Risk Management, Agency-Wide Controlling System, Project Plan and Integrated Project Review, General Budget Structure and Charging Policy, and Corporate Information Systems. It has contributed to improved management of the Agency's internal operations by engaging all internal stakeholders in a common objective, introducing improvements to planning and management methods, elaborating consolidated information structures and tools, contributing to enhanced transparency and accountability, and by providing qualified new policies, processes and tools.
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
Code of Federal Regulations, 2010 CFR
2010-07-01
... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...
Code of Federal Regulations, 2011 CFR
2011-07-01
... performance of the Central and Southern Project and other water management systems in the South Florida... locations and times. Natural system means all land and water managed by the Federal government or the State... System Operating Manual and Project Operating Manuals. Operating Manuals contain water control plans...
Civilian Agency Industry Working Group EVM World Update
NASA Technical Reports Server (NTRS)
Kerby, Jerald
2013-01-01
Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.
Effects of an incinerator project on a healthcare-waste management system.
Khammaneechan, Patthanasak; Okanurak, Kamolnetr; Sithisarankul, Pornchai; Tantrakarnapa, Kraichat; Norramit, Poonsup
2011-10-01
This evaluative research study aimed to assess the effects of the central healthcare incinerator project on waste management in Yala Province. The study data were collected twice: at baseline and during the operational phase. A combination of structured interview and observation were used during data collection. The study covered 127 healthcare facilities: government hospitals, healthcare centres, and private clinics. The results showed 63% of healthcare risk waste (HCRW) handlers attended the HCRW management training. Improvements in each stage of the HCRW management system were observed in all groups of facilities. The total cost of the HCRW management system did not change, however; the costs for hospitals decreased, whereas those for clinics increased significantly. It was concluded that the central healthcare waste incinerator project positively affected HCRW management in the area, although the costs of management might increase for a particular group. However, the benefits of changing to a more appropriately managed HCRW system will outweigh the increased costs.
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1996-01-01
Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.
NASA Technical Reports Server (NTRS)
Dittman, R. A.; Marks, V.
1983-01-01
Management Information System, MIS, provides Life Sciences Projects Division at Johnson Space Center with automated system for project managment. MIS utilizes Tektronix 4027 color graphics display terminal and form-fillout capability. User interface with MIS data base is through series of forms.
North Seattle advanced traffic management system (NSATMS) project evaluation
DOT National Transportation Integrated Search
2002-12-01
This report documents the findings of the evaluation of the North Seattle Advanced Traffic Management System (NSATMS) Project. The evaluation was originally designed to analyze the potential transportation benefits and costs of a regional arterial tr...
USDA-ARS?s Scientific Manuscript database
The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...
USDA-ARS?s Scientific Manuscript database
The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world's crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...
USDA-ARS?s Scientific Manuscript database
The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR...
USDA-ARS?s Scientific Manuscript database
The mission of the GRIN-Global Project is to create a new, scalable version of the Germplasm Resource Information System (GRIN) to provide the world’s crop genebanks with a powerful, flexible, easy-to-use plant genetic resource (PGR) information management system. The system will help safeguard PGR ...
A means to an end: a web-based client management system in palliative care.
O'Connor, Margaret; Erwin, Trudy; Dawson, Linda
2009-03-01
Home-based palliative care (hospice) services require comprehensive and fully integrated information systems to develop and manage the various aspects of their business, incorporating client data and management information. These systems assist in maintaining the quality of client care as well as improved management efficiencies. This article reports on a large not-for-profit home-based palliative care service in Australia, which embarked on a project to develop an electronic data management system specifically designed to meet the needs of the palliative care sector. This web-based client information management system represents a joint venture between the organization and a commercial company and has been a very successful project.
The personal receiving document management and the realization of email function in OAS
NASA Astrophysics Data System (ADS)
Li, Biqing; Li, Zhao
2017-05-01
This software is an independent software system, suitable for small and medium enterprises, contains personal office, scientific research project management and system management functions, independently run in relevant environment, and to solve practical needs. This software is an independent software system, using the current popular B/S (browser/server) structure and ASP.NET technology development, using the Windows 7 operating system, Microsoft SQL Server2005 Visual2008 and database as a development platform, suitable for small and medium enterprises, contains personal office, scientific research project management and system management functions, independently run in relevant environment, and to solve practical needs.
We Scrum Every Day: Using Scrum Project Management Framework for Group Projects
ERIC Educational Resources Information Center
Pope-Ruark, Rebecca
2012-01-01
Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…
Program Helps Standardize Documentation Of Software
NASA Technical Reports Server (NTRS)
Howe, G.
1994-01-01
Intelligent Documentation Management System, IDMS, computer program developed to assist project managers in implementing information system documentation standard known as NASA-STD-2100-91, NASA STD, COS-10300, of NASA's Software Management and Assurance Program. Standard consists of data-item descriptions or templates, each of which governs particular component of software documentation. IDMS helps program manager in tailoring documentation standard to project. Written in C language.
NASA Technical Reports Server (NTRS)
Puttkamer, J. V.
1973-01-01
An analysis has been conducted to find out whether the management techniques developed in connection with the Apollo project could be used for dealing with such urgent problems of modern society as the crisis of the cities, the increasing environmental pollution, and the steadily growing traffic. Basic concepts and definitions of program and system management are discussed together with details regarding the employment of these concepts in connection with the solution of the problems of the Apollo program. Principles and significance of a systems approach are considered, giving attention to planning, system analysis, system integration, and project management. An application of the methods of project management to the problems of the civil sector is possible if the special characteristics of each particular case are taken into account.
Research a Novel Integrated and Dynamic Multi-object Trade-Off Mechanism in Software Project
NASA Astrophysics Data System (ADS)
Jiang, Weijin; Xu, Yuhui
Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi- object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.
SDDOT'S enhanced pavement management system : visual distress survey manual [2017
DOT National Transportation Integrated Search
2017-05-11
In 1993, the South Dakota Department of Transportation initiated the Research Project SD93-14, Enhancement of South Dakotas Pavement Management System. As the Research Project progressed, it was determined that to better evaluate the condition of ...
Development of the digital design environment ProjectWise(TM) - phase 1.
DOT National Transportation Integrated Search
2017-04-28
The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...
Event-driven management algorithm of an Engineering documents circulation system
NASA Astrophysics Data System (ADS)
Kuzenkov, V.; Zebzeev, A.; Gromakov, E.
2015-04-01
Development methodology of an engineering documents circulation system in the design company is reviewed. Discrete event-driven automatic models using description algorithms of project management is offered. Petri net use for dynamic design of projects is offered.
Archiving a Software Development Project
2013-04-01
an ongoing monitoring system that identifies attempts and requests for retrieval, and ensures that the attempts and requests cannot proceed without...Intelligence Division Peter Fisher has worked as a consultant, systems analyst, software developer and project manager in Australia, Holland, the USA...4 3.1.3 DRMS – Defence Records Management System
Case management information systems: how to put the pieces together now and beyond year 2000.
Matthews, P
1999-01-01
Healthcare organizations must establish the goals and objectives of their case management processes before functional and system requirements can be defined. A gap analysis will identify existing systems that can be used to support case management as well as areas in need of systems support. The gap analysis will also identify short-term tactical projects and long-term strategic initiatives supporting the automation of case management. The projects resulting from the gap analysis must be incorporated into the organization's business and information systems plan and budget to ensure appropriate funding and prioritization.
Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel
NASA Astrophysics Data System (ADS)
Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi
Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.
78 FR 7477 - Multistate Corridor Operations and Management Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...
NASA Technical Reports Server (NTRS)
Sepulveda, Jose A.
1992-01-01
The stated purposes of the Management Science Faculty Fellowship Project were to: (1) provide a comprehensive analysis of KSC management training for engineers and other management professionals from project/program lead through executive levels; and (2) development of evaluation methodologies which can be used to perform ongoing program-wide course-to-course assessments. This report will focus primarily in the first stated purpose for the project. Ideally, the analysis of KSC management training will build in the current system and efficiently propose improvements to achieve existing goals and objectives while helping to identify new visions and new outcomes for the Center's Management Training Mission. Section 2 describes the objectives, approach, and specific tasks used to analyze KSC's Management training System. Section 3 discusses the main conclusions derived from an analysis of the available training data. Section 4 discusses the characteristics and benefits envisioned for a Management Training System. Section 5 proposes a Training System as identified by the results of a Needs Assessment exercise conducted at KSC this summer. Section 6 presents a number of recommendations for future work.
Distribution Management System Volt/VAR Evaluation | Grid Modernization |
NREL Distribution Management System Volt/VAR Evaluation Distribution Management System Volt/VAR Evaluation This project involves building a prototype distribution management system testbed that links a GE Grid Solutions distribution management system to power hardware-in-the-loop testing. This setup is
NASA Astrophysics Data System (ADS)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1990-01-01
Archival reports on developments in programs managed by the JPL Office of Telecommunications and Data Acquisition (TDA) are provided. Topics covered include: DSN advanced systems (tracking and ground-based navigation; communications, spacecraft-ground; and station control and system technology) and DSN systems implementation (capabilities for existing projects; capabilities for new projects; TDA program management and analysis; and Goldstone solar system radar).
ERIC Educational Resources Information Center
League for Innovation in the Community Coll., Los Angeles, CA.
Project USHER is designed to help community colleges implement a humanistic management system. This objective is to be achieved by giving each participating college the capability to redesign its own educational system through implementing a planning, programming, budgeting, and evaluation system (PPBE) within the context of participative…
MouseNet database: digital management of a large-scale mutagenesis project.
Pargent, W; Heffner, S; Schäble, K F; Soewarto, D; Fuchs, H; Hrabé de Angelis, M
2000-07-01
The Munich ENU Mouse Mutagenesis Screen is a large-scale mutant production, phenotyping, and mapping project. It encompasses two animal breeding facilities and a number of screening groups located in the general area of Munich. A central database is required to manage and process the immense amount of data generated by the mutagenesis project. This database, which we named MouseNet(c), runs on a Sybase platform and will finally store and process all data from the entire project. In addition, the system comprises a portfolio of functions needed to support the workflow management of the core facility and the screening groups. MouseNet(c) will make all of the data available to the participating screening groups, and later to the international scientific community. MouseNet(c) will consist of three major software components:* Animal Management System (AMS)* Sample Tracking System (STS)* Result Documentation System (RDS)MouseNet(c) provides the following major advantages:* being accessible from different client platforms via the Internet* being a full-featured multi-user system (including access restriction and data locking mechanisms)* relying on a professional RDBMS (relational database management system) which runs on a UNIX server platform* supplying workflow functions and a variety of plausibility checks.
The System of Management of Innovation Projects at a Higher Education
ERIC Educational Resources Information Center
Kalimullin, Aydar M.; Youngblood, Valery ?.; Khodyreva, Elana A.
2016-01-01
The urgency of the issue discussed in this article is caused by the need for development and assessment of new models and mechanisms of management of higher education institutions, which are connected with the development of the system of management of innovation projects and contribute to the development of educational institutions. The aim of…
Using Project Management Systems at the Construction Field Office
1989-03-01
instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which
Louisiana traffic sign inventory and management system : LTRC technical summary report.
DOT National Transportation Integrated Search
2008-03-01
This project initiated the development of such a comprehensive asset management system in Louisiana, starting with traffic sign inventory in a single parish. The projects primary goal was to undertake a pilot field inventory of sign attribute data...
DBMS as a Tool for Project Management
NASA Technical Reports Server (NTRS)
Linder, H.
1984-01-01
Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.
Enhancing Knowledge Sharing Management Using BIM Technology in Construction
Ho, Shih-Ping; Tserng, Hui-Ping
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
Managing and learning with multiple models: Objectives and optimization algorithms
Probert, William J. M.; Hauser, C.E.; McDonald-Madden, E.; Runge, M.C.; Baxter, P.W.J.; Possingham, H.P.
2011-01-01
The quality of environmental decisions should be gauged according to managers' objectives. Management objectives generally seek to maximize quantifiable measures of system benefit, for instance population growth rate. Reaching these goals often requires a certain degree of learning about the system. Learning can occur by using management action in combination with a monitoring system. Furthermore, actions can be chosen strategically to obtain specific kinds of information. Formal decision making tools can choose actions to favor such learning in two ways: implicitly via the optimization algorithm that is used when there is a management objective (for instance, when using adaptive management), or explicitly by quantifying knowledge and using it as the fundamental project objective, an approach new to conservation.This paper outlines three conservation project objectives - a pure management objective, a pure learning objective, and an objective that is a weighted mixture of these two. We use eight optimization algorithms to choose actions that meet project objectives and illustrate them in a simulated conservation project. The algorithms provide a taxonomy of decision making tools in conservation management when there is uncertainty surrounding competing models of system function. The algorithms build upon each other such that their differences are highlighted and practitioners may see where their decision making tools can be improved. ?? 2010 Elsevier Ltd.
DOT National Transportation Integrated Search
1997-03-01
This is our Management Advisory Memorandum on the National Airspace : System (NAS) Infrastructure Management System (NIMS) prototype : project in the Federal Aviation Administration (FAA). Our review was : initiated in response to a hotline complaint...
Missouri Ozark Forest Ecosystem Project: the experiment
Steven L. Sheriff
2002-01-01
Missouri Ozark Forest Ecosystem Project (MOFEP) is a unique experiment to learn about the impacts of management practices on a forest system. Three forest management practices (uneven-aged management, even-aged management, and no-harvest management) as practiced by the Missouri Department of Conservation were randomly assigned to nine forest management sites using a...
An on-line image data base system: Managing image collections
Malchus B. Baker; Daniel P. Huebner; Peter F. Ffolliott
2000-01-01
Many researchers and land management personnel want photographic records of the phases of their studies or projects. Depending on the personnel and the type of project, a study can result in a few or hundreds of photographic images. A data base system allows users to query using various parameters, such as key words, dates, and project locations, and to view images...
ERIC Educational Resources Information Center
Cook, Desmond L.; And Others
This memorandum reports on the third phase, the design, of a four-phase project to design project management training materials for local educational agencies. The first section of the memorandum explains some considerations regarding management education and the organization of the report. Section 2 presents the design specifications for the…
Krueger, Charles C.; Holbrook, Christopher; Binder, Thomas R.; Vandergoot, Christopher; Hayden, Todd A.; Hondorp, Darryl W.; Nate, Nancy; Paige, Kelli; Riley, Stephen; Fisk, Aaron T.; Cooke, Steven J.
2017-01-01
The Great Lakes Acoustic Telemetry Observation System (GLATOS), organized in 2012, aims to advance and improve conservation and management of Great Lakes fishes by providing information on behavior, habitat use, and population dynamics. GLATOS faced challenges during establishment, including a funding agency-imposed urgency to initiate projects, a lack of telemetry expertise, and managing a flood of data. GLATOS now connects 190+ investigators, provides project consultation, maintains a web-based data portal, contributes data to Ocean Tracking Network’s global database, loans equipment, and promotes science transfer to managers. The GLATOS database currently has 50+ projects, 39 species tagged, 8000+ fish released, and 150+ million tag detections. Lessons learned include (1) seek advice from others experienced in telemetry; (2) organize networks prior to when shared data is urgently needed; (3) establish a data management system so that all receivers can contribute to every project; (4) hold annual meetings to foster relationships; (5) involve fish managers to ensure relevancy; and (6) staff require full-time commitment to lead and coordinate projects and to analyze data and publish results.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
...; Oregon; Howard Elliot Johnson Fuels and Vegetation Management Project EIS AGENCY: Forest Service, USDA... Prineville, Oregon. The project area includes National Forest and Bureau of Land Management System lands in... effects will take place. The Howard Elliot Johnson Fuels and Vegetation Management Project decision and...
DOT National Transportation Integrated Search
2007-03-02
This report presents the case study and lessons learned for the national evaluation of the Great Lakes Intelligent Transportation Systems (GLITS) Airport ITS Integration and Road Infrastructure Management System (RIMS) projects. The Airport ITS Integ...
NASA Technical Reports Server (NTRS)
1979-01-01
Contractor information requirements necessary to support the power extension package project of the space shuttle program are specified for the following categories of data: project management; configuration management; systems engineering and test; manufacturing; reliability, quality assurance and safety; logistics; training; and operations.
NASA Astrophysics Data System (ADS)
Cristini, Luisa
2017-04-01
Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.
2012-11-01
reflecting the fact that project managers can often optimize the value of one of these parameters, but only at the expense of the other two. For example...which system developers can compare their SE capabilities to manage SE process improvements. As a reward for their participation, the companion...higher requirements development and management capability is strongly associat- ed with better program performance, particularly on challenging projects
The Management and Demonstration System at Murray State University.
ERIC Educational Resources Information Center
Schroeder, Gary G.
The management system in use at the Murray State University Teacher Corps Project is described. The system uses management by objectives and the demonstration approach, and encourages managers to focus on the development and demonstration of ideas, processes, and structures. The system's operating concepts of time management and human resources…
NASA Technical Reports Server (NTRS)
Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil
2007-01-01
The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.
Dialogue Systems and Dialogue Management
2016-12-01
dialogue management capability within DST Group’s Consensus project . UNCLASSIFIED UNCLASSIFIED Author Deeno Burgan National Security...3.1 Survey Process This research into dialogue management is part of a joint collaboration between DST Group and CSIRO. The project team comprised...
IEC 61511 and the capital project process--a protective management system approach.
Summers, Angela E
2006-03-17
This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.
A transportation-scheduling system for managing silvicultural projects
Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald
2005-01-01
A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...
Enhancing Understanding Of Coupled Human-Natural Systems Through Collaborative Learning
NASA Astrophysics Data System (ADS)
Santelmann, M. V.; Chan, S.; Morzillo, A.; Stebbins, A.; Wright, M.
2012-12-01
In the past decade, it has become clear that the dynamic nature of coupled human-natural systems must be better understood and incorporated into decision making. If the interactions between society and the rest of the ecosystem are poorly represented in system models, our ability to explore the potential consequences of feedbacks between the biophysical system and policy or management actions will be limited. Teams of researchers from three Oregon universities are collaborating with regional experts, water managers, and decision-makers to examine how climate change, population growth, and economic growth may alter the availability and use of water in the Willamette River Basin over the next one hundred years. A central project component is development of a version of the ENVISION modeling framework that will provide decision makers with a way to visualize the Willamette water system and evaluate the interaction of management choices with changing environmental and socioeconomic conditions. Key objectives of the project broader impacts team include: 1) assist with incorporating the human component of the system into the model, (2) fostering growth of the research team as an interdependent, interdisciplinary research community, and (3) communicating effectively with regional stakeholders. Through Learning-Action Networks we have been able to gather insightful, project-relevant knowledge on water use, management, policies and issues that impact water management in the region. We have identified the types of project outputs that managers and decision makers would find useful for anticipating water scarcity and informing integrative water systems responses. Events and processes used to accomplish our objectives began with field trips involving researchers, educators, and other stakeholders. Follow-up meetings and an all day symposium featured focus group interviews, plenary sessions on project progress, and interactive poster sessions in which participants could help identify water related policies and actions they would like to see modeled. Participants assisted in compiling an interactive table of potential policies and actions organized by water use sector and policy type (e.g., regulatory vs. incentive based). Involvement of K-12 educators and development of innovative interdisciplinary courses has enhanced the broader impacts of the project and helped us achieve multiple project objectives. We present plans to build on initial collaborative learning experiences to promote project outcomes that will advance coupled human-natural systems research and enhance the utility of model outcomes in water management.
Marshall Space Flight Center Ground Systems Development and Integration
NASA Technical Reports Server (NTRS)
Wade, Gina
2016-01-01
Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.
75 FR 23843 - Discretionary Bus and Bus Facilities Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... transit facilities and equipment. d. For facilities, evidence of proposed project compliance with ``Green Building'' certification. 3. For transit asset management system projects: If asset management system...-New York, Administrator, Region 7-Kansas One Bowling Green, Room 429, New City, MO, 901 Locust Street...
Enlightenment from ancient Chinese urban and rural stormwater management practices.
Wu, Che; Qiao, Mengxi; Wang, Sisi
2013-01-01
Hundreds of years ago, the ancient Chinese implemented several outstanding projects to cope with the changing climate and violent floods. Some of these projects are still in use today. These projects evolved from the experience and knowledge accumulated through the long coexistence of people with nature. The concepts behind these ancient stormwater management practices, such as low-impact development and sustainable drainage systems, are similar to the technology applied in modern stormwater management. This paper presents the cases of the Hani Terrace in Yunnan and the Fushou drainage system of Ganzhou in Jiangxi. The ancient Chinese knowledge behind these cases is seen in the design concepts and the features of these projects. These features help us to understand better their applications in the contemporary environment. In today's more complex environment, integrating traditional and advanced philosophy with modern technologies is extremely useful in building urban and rural stormwater management systems in China.
A cost-benefit analysis for materials management information systems.
Slapak-Iacobelli, L; Wilde, A H
1993-02-01
The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.
Re-engineering Nascom's network management architecture
NASA Technical Reports Server (NTRS)
Drake, Brian C.; Messent, David
1994-01-01
The development of Nascom systems for ground communications began in 1958 with Project Vanguard. The low-speed systems (rates less than 9.6 Kbs) were developed following existing standards; but, there were no comparable standards for high-speed systems. As a result, these systems were developed using custom protocols and custom hardware. Technology has made enormous strides since the ground support systems were implemented. Standards for computer equipment, software, and high-speed communications exist and the performance of current workstations exceeds that of the mainframes used in the development of the ground systems. Nascom is in the process of upgrading its ground support systems and providing additional services. The Message Switching System (MSS), Communications Address Processor (CAP), and Multiplexer/Demultiplexer (MDM) Automated Control System (MACS) are all examples of Nascom systems developed using standards such as, X-windows, Motif, and Simple Network Management Protocol (SNMP). Also, the Earth Observing System (EOS) Communications (Ecom) project is stressing standards as an integral part of its network. The move towards standards has produced a reduction in development, maintenance, and interoperability costs, while providing operational quality improvement. The Facility and Resource Manager (FARM) project has been established to integrate the Nascom networks and systems into a common network management architecture. The maximization of standards and implementation of computer automation in the architecture will lead to continued cost reductions and increased operational efficiency. The first step has been to derive overall Nascom requirements and identify the functionality common to all the current management systems. The identification of these common functions will enable the reuse of processes in the management architecture and promote increased use of automation throughout the Nascom network. The MSS, CAP, MACS, and Ecom projects have indicated the potential value of commercial-off-the-shelf (COTS) and standards through reduced cost and high quality. The FARM will allow the application of the lessons learned from these projects to all future Nascom systems.
Lech, Przemysław
2016-01-01
The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.
NASA Earned Value Management (EVM) Update
NASA Technical Reports Server (NTRS)
Kerby, Jerald
2013-01-01
Earned Value Management (EVM) is an integrated management control system for assessing, understanding and qualifying what a project is achieving with the resoures. EVM integrates technical cost and schedules with risk management. It allows objective assessment and quantification of current project performance, and helps predict future performance-based trents.
Teaching IT Project Management to Postgraduate Business Students: A Practical Approach
ERIC Educational Resources Information Center
Tatnall, Arthur; Reyes, Gina
2005-01-01
While most Information Systems (IS) professionals spend much of their time in the implementation or management of projects, the curriculum of university Information Technology (IT) courses does not always reflect this. While most university IT courses cover some aspects of project management, some do not go into this topic in any depth, and many…
ERIC Educational Resources Information Center
Lokey, Kenneth R.
The Satellite Technology Demonstration (STD), a project of the Federation of Rocky Mountain States, Inc. (FRMS), employed a project management model for its organizational structure. The organization and management system utilized by the STD was designed to accomplish a predetermined set of objectives with the highest quality possible within a…
System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.
DOT National Transportation Integrated Search
2013-02-01
The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...
Solid Waste Information and Tracking System Client Server Conversion Project Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
GLASSCOCK, J.A.
2000-02-10
The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion
MSFC Propulsion Systems Department Knowledge Management Project
NASA Technical Reports Server (NTRS)
Caraccioli, Paul A.
2007-01-01
This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.
TEX-SIS FOLLOW-UP: Student Follow-up Management Information System. Procedures Manual.
ERIC Educational Resources Information Center
Tarrant County Junior Coll. District, Ft. Worth, TX.
Project FOLLOW-UP was conducted to develop, test, and validate a statewide management information system for follow-up of Texas public junior and community college students. The results of this project was a student information system (TEX-SIS) consisting of seven subsystems: (1) Student's Educational Intent, (2) Nonreturning Student Follow-up,…
TEX-SIS FOLLOW-UP: Student Follow-up Management Information System. Data Processing Manual.
ERIC Educational Resources Information Center
Tarrant County Junior Coll. District, Ft. Worth, TX.
Project FOLLOW-UP was conducted to develop, test, and validate a statewide management information system for follow-up of Texas public junior and community college students. The result of this project was a student information system (TEX-SIS) consisting of seven subsystems: (1) Student's Educational Intent, (2) Nonreturning Student Follow-up, (3)…
Research review for information management
NASA Technical Reports Server (NTRS)
Bishop, Peter C.
1988-01-01
The goal of RICIS research in information management is to apply currently available technology to existing problems in information management. Research projects include the following: the Space Business Research Center (SBRC), the Management Information and Decision Support Environment (MIDSE), and the investigation of visual interface technology. Several additional projects issued reports. New projects include the following: (1) the AdaNET project to develop a technology transfer network for software engineering and the Ada programming language; and (2) work on designing a communication system for the Space Station Project Office at JSC. The central aim of all projects is to use information technology to help people work more productively.
Toward an expert project management system
NASA Technical Reports Server (NTRS)
Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas
1987-01-01
The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, R.E.
1994-11-02
This document provides the software development plan for the Waste Receiving and Processing (WRAP) Module 1 Data Management System (DMS). The DMS is one of the plant computer systems for the new WRAP 1 facility (Project W-026). The DMS will collect, store, and report data required to certify the low level waste (LLW) and transuranic (TRU) waste items processed at WRAP 1 as acceptable for shipment, storage, or disposal.
Model Special Education Manpower Information and Management System. Final Report.
ERIC Educational Resources Information Center
Gilles, Cynthia
The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…
DOT National Transportation Integrated Search
1999-10-01
The following case study provides a snapshot of the Boston Central Artery/Tunnel Integration Project Control System (IPCS) operations control center. It follows the outline provided in the companion document, Metropolitan Transportation Management Ce...
Systemic safety project selection tool.
DOT National Transportation Integrated Search
2013-07-01
"The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...
NASA Astrophysics Data System (ADS)
Rauser, Florian; Vamborg, Freja
2016-04-01
The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should complement the current system, by creating permanent, sustained options for interactions between large research projects in similar fields. In the long run such a centre might improve on the host-based system because the centre-based solution allows multiple projects to be coordinated in conjunction by experienced science managers, using overlap in meeting organization, reporting, infrastructure, travel and so on. To still maintain close cooperation between project managers and lead PIs, we envision a virtual centre that creates extensive collaborative opportunities by organizing yearly retreats, a shared technical data base, et cetera. As "CESSMA" is work in progress (we have applied for funding for 2016-18), we would like to use this opportunity to discuss chances, potential problems, experiences and options for this attempt to institutionalise the very reason for this session: improved, coordinated, effective science coordination; and to create a central focal point for public / academia interactions.
Accruals for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources. Accruals are made at the project level. At the inception of each project, Project Management and the Accounts Payable Group make a mutual decision on whether periodic accrual entries should be made for it.
Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.
Leong, Tiong Kung; Ariff, Mohd. Shoki Md.
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1998-01-01
A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.
A database management capability for Ada
NASA Technical Reports Server (NTRS)
Chan, Arvola; Danberg, SY; Fox, Stephen; Landers, Terry; Nori, Anil; Smith, John M.
1986-01-01
The data requirements of mission critical defense systems have been increasing dramatically. Command and control, intelligence, logistics, and even weapons systems are being required to integrate, process, and share ever increasing volumes of information. To meet this need, systems are now being specified that incorporate data base management subsystems for handling storage and retrieval of information. It is expected that a large number of the next generation of mission critical systems will contain embedded data base management systems. Since the use of Ada has been mandated for most of these systems, it is important to address the issues of providing data base management capabilities that can be closely coupled with Ada. A comprehensive distributed data base management project has been investigated. The key deliverables of this project are three closely related prototype systems implemented in Ada. These three systems are discussed.
ERIC Educational Resources Information Center
Gardner, David C.; Beatty, Grace Joely
Within the context of the major objectives of developing, field testing, and refining the curriculum materials described in volume 1 of this final report (CE 024 117), Volume 2 describes and critiques the management system used by Project HIRE in that development process. (See Note for availability of curriculum materials.) Chapter 1 introduces…
Communication Scaffolds for Project Management in PBL
ERIC Educational Resources Information Center
Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi
2017-01-01
In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…
Improvement of Project Portfolio Management in an Information Technology Consulting Company
NASA Astrophysics Data System (ADS)
Kaewta, S.; Chutima, P.
2014-06-01
The scope of this research is to improve the efficiency of multiple project management in an information technology consulting company through the adaptation of the project portfolio management technique. The project management information system (PMIS) is implemented to establish effective communication channels so that internal and external teams as well as all relevant stakeholders can be employed to negotiate their work schedules. In addition, all activities created by multiple teams can be systematically reviewed and combined into a single checklist to be used as an agreed working plan for all team members. A general guideline for project portfolio management in information technology consulting companies is also proposed, which could results in a higher level of project on-time delivery.
Decision support tools to support the operations of traffic management centers (TMC)
DOT National Transportation Integrated Search
2011-01-31
The goal of this project is to develop decision support tools to support traffic management operations based on collected intelligent transportation system (ITS) data. The project developments are in accordance with the needs of traffic management ce...
A system safety model for developmental aircraft programs
NASA Technical Reports Server (NTRS)
Amberboy, E. J.; Stokeld, R. L.
1982-01-01
Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.
Latorre, Mariano; Silva, Herman; Saba, Juan; Guziolowski, Carito; Vizoso, Paula; Martinez, Veronica; Maldonado, Jonathan; Morales, Andrea; Caroca, Rodrigo; Cambiazo, Veronica; Campos-Vargas, Reinaldo; Gonzalez, Mauricio; Orellana, Ariel; Retamales, Julio; Meisel, Lee A
2006-11-23
Expressed sequence tag (EST) analyses provide a rapid and economical means to identify candidate genes that may be involved in a particular biological process. These ESTs are useful in many Functional Genomics studies. However, the large quantity and complexity of the data generated during an EST sequencing project can make the analysis of this information a daunting task. In an attempt to make this task friendlier, we have developed JUICE, an open source data management system (Apache + PHP + MySQL on Linux), which enables the user to easily upload, organize, visualize and search the different types of data generated in an EST project pipeline. In contrast to other systems, the JUICE data management system allows a branched pipeline to be established, modified and expanded, during the course of an EST project. The web interfaces and tools in JUICE enable the users to visualize the information in a graphical, user-friendly manner. The user may browse or search for sequences and/or sequence information within all the branches of the pipeline. The user can search using terms associated with the sequence name, annotation or other characteristics stored in JUICE and associated with sequences or sequence groups. Groups of sequences can be created by the user, stored in a clipboard and/or downloaded for further analyses. Different user profiles restrict the access of each user depending upon their role in the project. The user may have access exclusively to visualize sequence information, access to annotate sequences and sequence information, or administrative access. JUICE is an open source data management system that has been developed to aid users in organizing and analyzing the large amount of data generated in an EST Project workflow. JUICE has been used in one of the first functional genomics projects in Chile, entitled "Functional Genomics in nectarines: Platform to potentiate the competitiveness of Chile in fruit exportation". However, due to its ability to organize and visualize data from external pipelines, JUICE is a flexible data management system that should be useful for other EST/Genome projects. The JUICE data management system is released under the Open Source GNU Lesser General Public License (LGPL). JUICE may be downloaded from http://genoma.unab.cl/juice_system/ or http://www.genomavegetal.cl/juice_system/.
Evaluation of the impact of the I-66 active traffic management system : final report.
DOT National Transportation Integrated Search
2016-09-01
Construction of a Virginia Department of Transportation project to install an Active Traffic Management (ATM) system on Interstate-66 (I-66) from U.S. 29 in Centreville to the Capital Beltway (I-495) was completed in September 2015. The project was c...
40 CFR 35.2015 - State priority system and project priority list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... achieve optimum water quality management consistent with the goals and requirements of the Act. All..., needs and priorities set forth in areawide water quality management plans, and any other factors... priority to projects in priority water quality areas. The priority system may also include the...
NAIT CPD. Competency Profile Development: A Systems Approach for Program Review Projects.
ERIC Educational Resources Information Center
Dhariwal, Mave
The Engineering Technologies Division of the Northern Alberta Institute of Technology (NAIT) in Canada has developed a systems approach to program review called Competency Profile Development (CPD). This approach utilizes a combination of organizational communication, project management, management-by-objectives, a modified Developing A Curriculum…
DOT National Transportation Integrated Search
2007-12-01
This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...
The ZOG Technology Demonstration Project: A System Evaluation of USS CARL VINSON (CVN 70)
1984-12-01
part of a larger project involving development of a wide range of computer technologies, including artifcial intelligence and a long-range computer...shipboard manage- ment, aircraft management, expert systems, menu selection, man- machine interface, artificial intelligence , automation; shipboard It AWM...functions, planning, evaluation, training, hierarchical data bases The objective of this project was to conduct an evaluation of ZOG, a general purpose
Getting the Best Value in a Source Selection
2015-12-01
leadership, for both civilian and military program managers . Army COL James C. Mills relieved COL Gary D. Stephens as project manager for the...Precision Fires Rocket and Missile Systems (PFRMS) on July 15. COL William D. Jackson relieved COL Thomas H. Todd as project manager for Utility...Helicopters (UH) on July 15. COL Shane N. Fullmer relieved COL John Cavedo, Jr. as project manager for Joint Program Office, Joint Light Tactical Vehicles
Intermediate Outcomes, Strategies, and Challenges of Eight Healthy Start Projects
Walker, Deborah Klein; Hargreaves, Margaret; Rosenbach, Margo
2008-01-01
Site visits were conducted for the evaluation of the national Healthy Start program to gain an understanding of how projects design and implement five service components (outreach, case management, health education, depression screening and interconceptional care) and four system components (consortium, coordination/collaboration, local health system action plan and sustainability) as well as program staff’s perceptions of these components’ influence on intermediate outcomes. Interviews with project directors, case managers, local evaluators, clinicians, consortium members, outreach/lay workers and other stakeholders were conducted during 3-day in-depth site visits with eight Healthy Start grantees. Grantees reported that both services and systems components were related to self-reported service achievements (e.g. earlier entry into prenatal care) and systems achievements (e.g. consumer involvement). Outreach, case management, and health education were perceived as the service components that contributed most to their achievements while consortia was perceived as the most influential systems component in reaching their goals. Furthermore, cultural competence and community voice were overarching project components that addressed racial/ethnic disparities. Finally, there was great variability across sites regarding the challenges they faced, with poor service availability and limited funding the two most frequently reported. Service provision and systems development are both critical for successful Healthy Start projects to achieve intermediate program outcomes. Unique contextual and community issues influence Healthy Start project design, implementation and reported accomplishments. All eight projects implement the required program components yet outreach, case management, and health education are cited most frequently for contributing to their perceived achievements. PMID:19011959
Project monitoring and evaluation: an enhancing method for health research system management.
Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar
2014-04-01
Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.
Tools and Methods for Risk Management in Multi-Site Engineering Projects
NASA Astrophysics Data System (ADS)
Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman
In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.
Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope
NASA Astrophysics Data System (ADS)
Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.
2012-09-01
Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Balducelli, C.; Bologna, S.; Di Costanzo, G.
1995-12-31
The paper describes part of the results achieved in the framework of the MUSTER project (Multi-Users System for Training and Evaluating Environmental Emergency Response). The aim of this project is to define the detailed specifications of a computer based system supporting collaborative training for emergency management. A system prototype has been implemented to support the refinement and improvement of the system specifications.
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Using computer software to improve group decision-making.
Mockler, R J; Dologite, D G
1991-08-01
This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.
Cyber-intrusion Auto-response and Policy Management System (CAPMS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lusk, Steve; Lawrence, David; Suvana, Prakash
The Cyber-intrusion Auto-response and Policy Management System (CAPMS) project was funded by a grant from the US Department of Energy (DOE) Cybersecurity for Energy Delivery Systems (CEDS) program with contributions from two partner electric utilities: Southern California Edison (SCE) and Duke Energy. The goal of the project was to demonstrate protecting smart grid assets from a cyber attack in a way that “does not impede critical energy delivery functions.” This report summarizes project goals and activities for the CAPMS project and explores what did and did not work as expected. It concludes with an assessment of possible benefits and valuemore » of the system for the future.« less
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
A Case Study of the United States Navy’s Enterprise Resource Planning System
2006-06-01
incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system
GREMEX- GODDARD RESEARCH AND ENGINEERING MANAGEMENT EXERCISE SIMULATION SYSTEM
NASA Technical Reports Server (NTRS)
Vaccaro, M. J.
1994-01-01
GREMEX is a man-machine management simulation game of a research and development project. It can be used to depict a project from just after the development of the project plan through the final construction phase. The GREMEX computer programs are basically a program evaluation and review technique (PERT) reporting system. In the usual PERT program, the operator inputs each month the amount of work performed on each activity and the computer does the bookkeeping to determine the expected completion date of the project. GREMEX automatically assumes that all activities due to be worked in the current month will be worked. GREMEX predicts new durations (and costs) each month based on management actions taken by the players and the contractor's abilities. Each activity is assigned the usual cost and duration estimates but must also be assigned three parameters that relate to the probability that the time estimate is correct, the probability that the cost estimate is correct, and the probability of technical success. Management actions usually can be expected to change these probabilities. For example, use of overtime or double shifts in research and development work will decrease duration and increase cost by known proportions and will also decrease the probability of technical success due to an increase in the likelihood of accidents or mistakes. These re-estimating future events and assigning probability factors provides life to the model. GREMEX is not a production job for project management. GREMEX is a game that can be used to train management personnel in the administration of research and development type projects. GREMEX poses no 'best way' to manage a project. The emphasis of GREMEX is to expose participants to many of the factors involved in decision making when managing a project in a government research and development environment. A management team can win the game by surpassing cost, schedule, and technical performance goals established when the simulation began. The serious management experimenter can use GREMEX to explore the results of management methods they could not risk in real life. GREMEX can operate with any research and development type project with up to 15 subcontractors and produces reports simulating monthly or quarterly updates of the project PERT network. Included with the program is a data deck for simulation of a fictitious spacecraft project. Instructions for substituting other projects are also included. GREMEX is written in FORTRAN IV for execution in the batch mode and has been implemented on an IBM 360 with a central memory requirement of approximately 350K (decimal) of 8 bit bytes. The GREMEX system was developed in 1973.
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, Roy H.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.
1987-01-01
The Software Automation, Generation and Administration (SAGA) project is investigating the design and construction of practical software engineering environments for developing and maintaining aerospace systems and applications software. The research includes the practical organization of the software lifecycle, configuration management, software requirements specifications, executable specifications, design methodologies, programming, verification, validation and testing, version control, maintenance, the reuse of software, software libraries, documentation, and automated management.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ball, T.; Brandt, C.; Calfee, J.
1994-03-01
The Data Management Plan and Functional System Design supports the Clinch River Remedial Investigation (CRRI) and Waste Area Grouping (WAG) 6 Environmental Monitoring Program. The objective of the Data Management Plan and Functional System Design is to provide organization, integrity, security, traceability, and consistency of the data generated during the CRRI and WAG 6 projects. Proper organization will ensure that the data are consistent with the procedures and requirements of the projects. The Information Management Groups (IMGs) for these two programs face similar challenges and share many common objectives. By teaming together, the IMGs have expedited the development and implementationmore » of a common information management strategy that benefits each program.« less
ERIC Educational Resources Information Center
Kastner, Theodore A.; Walsh, Kevin K.; Criscione, Teri
1997-01-01
Presents a general model of the structure and functioning of managed care and describes elements (provider networks, fiscal elements, risk estimation, case-mix, management information systems, practice parameters, and quality improvement) critical to people with developmental disabilities. Managed care demonstration projects and a hypothetical…
Le management des projets scientifiques
NASA Astrophysics Data System (ADS)
Perrier, Françoise
2000-12-01
We describe in this paper a new approach for the management of scientific projects. This approach is the result of a long reflexion carried out within the MQDP (Methodology and Quality in the Project Development) group of INSU-CNRS, and continued with Guy Serra. Our reflexion was initiated with the study of the so-called `North-American Paradigm' which was, initially considered as the only relevant management model. Through our active participation in several astrophysical projects we realized that this model could not be applied to our laboratories without major modifications. Therefore, step-by-step, we have constructed our own methodology, using to the fullest human potential resources existing in our research field, their habits and skills. We have also participated in various working groups in industrial and scientific organisms for the benefits of CNRS. The management model presented here is based on a systemic and complex approach. This approach lets us describe the multiple aspects of a scientific project specially taking into account the human dimension. The project system model includes three major interconnected systems, immersed within an influencing and influenced environment: the `System to be Realized' which defines scientific and technical tasks leading to the scientific goals, the `Realizing System' which describes procedures, processes and organization, and the `Actors' System' which implements and boosts all the processes. Each one exists only through a series of successive models, elaborated at predefined dates of the project called `key-points'. These systems evolve with time and under often-unpredictable circumstances and the models have to take it into account. At these key-points, each model is compared to reality and the difference between the predicted and realized tasks is evaluated in order to define the data for the next model. This model can be applied to any kind of projects.
Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success
2009-09-01
comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to
A parallel data management system for large-scale NASA datasets
NASA Technical Reports Server (NTRS)
Srivastava, Jaideep
1993-01-01
The past decade has experienced a phenomenal growth in the amount of data and resultant information generated by NASA's operations and research projects. A key application is the reprocessing problem which has been identified to require data management capabilities beyond those available today (PRAT93). The Intelligent Information Fusion (IIF) system (ROEL91) is an ongoing NASA project which has similar requirements. Deriving our understanding of NASA's future data management needs based on the above, this paper describes an approach to using parallel computer systems (processor and I/O architectures) to develop an efficient parallel database management system to address the needs. Specifically, we propose to investigate issues in low-level record organizations and management, complex query processing, and query compilation and scheduling.
Task Management for Firefighters: A Practical Approach to Task Management.
ERIC Educational Resources Information Center
Roberts, Stephen S.
1979-01-01
A project management system for organizing requests from multiple departments and controlling the workload of the development/maintenance computer staff is described. Practical solutions to deciding project priorities, determining time estimates, creating positive peer pressure among programing staff, and formalizing information requests are…
NASA Risk Management Handbook. Version 1.0
NASA Technical Reports Server (NTRS)
Dezfuli, Homayoon; Benjamin, Allan; Everett, Christopher; Maggio, Gaspare; Stamatelatos, Michael; Youngblood, Robert; Guarro, Sergio; Rutledge, Peter; Sherrard, James; Smith, Curtis;
2011-01-01
The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \\Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.
MATS--Management Accounting Tutorial System. Version 1.0. Project Documentation.
ERIC Educational Resources Information Center
Wardle, Andrew; O'Connor, Rodric
The Management Accounting Tutorial System (MATS) is a management accounting database for a carpet manufacturing company. The system allows the display and output of monthly activities, and is intended to provide a means of illustrating the main topics of the second year management accounting course at Manchester University. The system itself…
ERIC Educational Resources Information Center
Allan, George
1999-01-01
A student-centered learning model for a course on information systems project management consisted of individual study and group discussion with facilitator guidance. Data from session records, repertory grids, and a learning network diagram showed that interactive learning was more effective and students took responsibility, although some…
Design of Training Systems Phase I Summary Report.
ERIC Educational Resources Information Center
Lindahl, William H.; And Others
A summary is provided of the status of Phase I of the three-stage project, "Design of Training Systems" (DOTS). The purpose of the overall project is described as being to introduce the technologies of education, psychology, management and operations research into the management of Navy training. Phase I of the effort is designed to…
Cost and schedule management on the quiet short-haul research aircraft project
NASA Technical Reports Server (NTRS)
Wilcox, D. E.; Patterakis, P.
1979-01-01
The Quiet Short-Haul Research Aircraft (QSRA) Project, one of the largest aeronautical programs undertaken by NASA to date, achieved a significant cost underrun. This is attributed to numerous factors, not the least of which were the contractual arrangement and the system of cost and schedule management employed by the contractor. This paper summarizes that system and the methods used for cost/performance measurement by the contractor and by the NASA project management. Recommendations are made for the use of some of these concepts in particular for future programs of a similar nature.
Data management strategies for multinational large-scale systems biology projects.
Wruck, Wasco; Peuker, Martin; Regenbrecht, Christian R A
2014-01-01
Good accessibility of publicly funded research data is essential to secure an open scientific system and eventually becomes mandatory [Wellcome Trust will Penalise Scientists Who Don't Embrace Open Access. The Guardian 2012]. By the use of high-throughput methods in many research areas from physics to systems biology, large data collections are increasingly important as raw material for research. Here, we present strategies worked out by international and national institutions targeting open access to publicly funded research data via incentives or obligations to share data. Funding organizations such as the British Wellcome Trust therefore have developed data sharing policies and request commitment to data management and sharing in grant applications. Increased citation rates are a profound argument for sharing publication data. Pre-publication sharing might be rewarded by a data citation credit system via digital object identifiers (DOIs) which have initially been in use for data objects. Besides policies and incentives, good practice in data management is indispensable. However, appropriate systems for data management of large-scale projects for example in systems biology are hard to find. Here, we give an overview of a selection of open-source data management systems proved to be employed successfully in large-scale projects.
Data management strategies for multinational large-scale systems biology projects
Peuker, Martin; Regenbrecht, Christian R.A.
2014-01-01
Good accessibility of publicly funded research data is essential to secure an open scientific system and eventually becomes mandatory [Wellcome Trust will Penalise Scientists Who Don’t Embrace Open Access. The Guardian 2012]. By the use of high-throughput methods in many research areas from physics to systems biology, large data collections are increasingly important as raw material for research. Here, we present strategies worked out by international and national institutions targeting open access to publicly funded research data via incentives or obligations to share data. Funding organizations such as the British Wellcome Trust therefore have developed data sharing policies and request commitment to data management and sharing in grant applications. Increased citation rates are a profound argument for sharing publication data. Pre-publication sharing might be rewarded by a data citation credit system via digital object identifiers (DOIs) which have initially been in use for data objects. Besides policies and incentives, good practice in data management is indispensable. However, appropriate systems for data management of large-scale projects for example in systems biology are hard to find. Here, we give an overview of a selection of open-source data management systems proved to be employed successfully in large-scale projects. PMID:23047157
Experiential learning in control systems laboratories and engineering project management
NASA Astrophysics Data System (ADS)
Reck, Rebecca Marie
Experiential learning is a process by which a student creates knowledge through the insights gained from an experience. Kolb's model of experiential learning is a cycle of four modes: (1) concrete experience, (2) reflective observation, (3) abstract conceptualization, and (4) active experimentation. His model is used in each of the three studies presented in this dissertation. Laboratories are a popular way to apply the experiential learning modes in STEM courses. Laboratory kits allow students to take home laboratory equipment to complete experiments on their own time. Although students like laboratory kits, no previous studies compared student learning outcomes on assignments using laboratory kits with existing laboratory equipment. In this study, we examined the similarities and differences between the experiences of students who used a portable laboratory kit and students who used the traditional equipment. During the 2014- 2015 academic year, we conducted a quasi-experiment to compare students' achievement of learning outcomes and their experiences in the instructional laboratory for an introductory control systems course. Half of the laboratory sections in each semester used the existing equipment, while the other sections used a new kit. We collected both quantitative data and qualitative data. We did not identify any major differences in the student experience based on the equipment they used. Course objectives, like research objectives and product requirements, help provide clarity and direction for faculty and students. Unfortunately, course and laboratory objectives are not always clearly stated. Without a clear set of objectives, it can be hard to design a learning experience and determine whether students are achieving the intended outcomes of the course or laboratory. In this study, I identified a common set of laboratory objectives, concepts, and components of a laboratory apparatus for undergraduate control systems laboratories. During the summer of 2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects course. Two students from the project management course function as project managers and lead a team of undergraduate students in the second course through a project. I studied how closely the project management experience in these courses aligns with engineering project management in industry. In the spring of 2015, I enrolled in the project management course at a large Midwestern university. I used analytic autoethnography to compare my experiences in the course with my experiences as a project engineer at a large aerospace company. I found that the experience in the course provided an authentic and comprehensive opportunity to practice most of the skills listed in the Project Management Book of Knowledge (an industry standard) as necessary for project managers. Some components of the course that made it successful: I was the project manager for the whole term, I worked with a real client, and the team defined and delivered the project before the end of the semester.
Electronic construction collaboration system : phase III.
DOT National Transportation Integrated Search
2011-12-01
This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Br...
Hanford tanks initiative (HTI) configuration management desk instruction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaus, P.S., Fluor Daniel Hanford
The purpose of the document is to provide working level directions for submitting requirements, making changes to the requirements database, and entering Project documentation into the HTI Project information and document management system.
78 FR 22604 - Privacy Act of 1974, as Amended; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-16
...: Chief-Office of Strategic Systems Management, Chief-Office of Quality, Chief-Office of Order Management & Delivery Systems, and Chief-Office of Portfolio & Project Management. Bureau of Engraving and Printing...; System of Records AGENCY: Bureau of Engraving and Printing, Treasury. ACTION: Notice of systems of...
DOT National Transportation Integrated Search
2005-07-01
This report presents the results of the evaluation of the I-5/Barbur Boulevard Parallel Corridor Traffic Management Demonstration Project, a cooperative project between the Oregon Department of Transportation (ODOT) and the City of Portland to integr...
Systems Engineering and Management Applications of ISO 9001:2015 for Government
NASA Technical Reports Server (NTRS)
Shepherd, Christena C.
2016-01-01
The manufacturing segment of the business world is busy assessing the impact of ISO 9001:2015, and updating their management systems to meet the required compliance date. What does the new revision mean for government agencies that deliver large engineering projects rather than mass production? In fact, the standard, especially the new revision, can be used quite readily for government agencies, or applied to specific projects, once it is understood in terms of the similarities with systems engineering and project management. From there it can be extrapolated to "mission realization" systems, and a Quality Management System (QMS) is a logical result that can bring order to processes and systems that likely already exist in some fashion. ISO 9001:2015 is less product-oriented than previous versions. It can be more broadly applied to public organizations as well as private; and to services (missions) as well as products. The emphasis on risk management in the revised standard provides the needed balance for weighing decisions with respect to cost, schedule, technical, safety, and regulatory compliance; so if this is not part of agency governance already, this is a good place to start, especially for large engineering projects. The Systems Engineering standard used for this analysis is from NASA's NPR 7123.1 NASA Systems Engineering Processes and Requirements; however, those who are more familiar with ISO/IEC 26702 Systems Engineering-application and management of the systems engineering process, or SAE/EIA 632 Processes for Engineering a System will also recognize the similarities. In reality, the QMS outlined by ISO 9001 reinforces the systems engineering processes, and serves to ensure that they are adequately implemented, although most of the ISO 9001 literature emphasizes the production and process aspects of the standard. Rather than beginning with ISO 9001and getting lost in the vocabulary, it is useful to begin with the systems engineering lifecycle. Identification of stakeholder expectations, identifying solutions, creating specific product or service designs, production of the product or service, delivery to the public, and the associated management, planning, and control processes, are a familiar place to begin thinking of the overall system of identifying, designing, and competing a project or mission. Lining up this lifecycle with the ISO requirements (see Figure 1) illustrates how a quality management system is concerned with the same processes, and provides a governance and assurance function. If implemented properly, there are cost savings resulting from less rework, repair, reprocessing, failures, misplaced documents, and similar types of deficiencies1. Starting with an organization's systems engineering processes allows the organization to use their own terminology for a QMS plan, and tailor the plan to their own project or organization, so that it is more easily developed, understood, and implemented.
Project Management Using Modern Guidance, Navigation and Control Theory
NASA Technical Reports Server (NTRS)
Hill, Terry
2010-01-01
The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.
Improved cost monitoring and control through the Earned Value Management System
NASA Astrophysics Data System (ADS)
Hunter, Howard; Fitzgerald, Richard; Barlow, Dewey
2014-01-01
As economic pressure and competition for budget among federal agencies has increased, there has been an increasing need for more granular data and robust management information systems. This is especially true for the execution of major civilian space programs. This need has resulted in new program management requirements being implemented in an attempt to limit cost and schedule growth. In particular, NASA Procedural Requirements (NPR) 7120.5D requires the implementation of an Earned Value Management System (EVMS) compliant with the requirements of American National Standards Institute (ANSI)/Electronic Industries Alliance Standard 748-B. The Radiation Belt Storm Probes (RBSP) program management team at The Johns Hopkins University Applied Physics Laboratory (JHU/APL) made a decision to implement an EVMS on RBSP during Phase B—a year earlier than specified in the contractual Phase C reporting requirement as defined in the NPR. This decision was made so that the project would have the benefit of 12 months of training and hands-on implementation during Phase B. Although there were a number of technical and process hurdles encountered during Phase B and into Phase C, the system was working well when the Integrated Baseline Review (IBR) was held in August 2009. The IBR was a success because it met the review requirements. It was also clear to all IBR participants that the EVMS was providing value to the project management team. Although the IBR pointed out some areas of concern regarding process and ANSI compliance, the system had markedly improved the project's ability to monitor cost and schedule. This, in turn, allowed the project team to foresee problems in advance, formulate corrective actions, and implement course corrections without causing significant adverse impact to the project. Opponents of EVMS systems often communicate the unfavorable opinion that EVMS systems create unnecessary cost and administration. Although it is undeniable that EVMS implementation does not occur without cost, the cost is minimal in comparison to the benefits of successful implementation. This paper will focus on the implementation of EVMS on the RBSP project, explain EV processes and the implementation's cost, and analyze the benefits of EVMS to provide insight into cost/benefit considerations for other projects considering EVMS implementation. This paper will do this by focusing on the following points: (1) RBSP is the first full-up implementation of earned value management (EVM) at JHU/APL; (2) RBSP EVM started in Phase B; (3) RBSP EVM implementation has been working well in Phase C/D; (4) RBSP EVM implementation has been recognized by Goddard Space Flight Center and NASA Headquarters as successful; and (5) an assessment of the benefits of EVMS to the project management team and sponsor shows that the system's benefits outweigh the cost of implementation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...
41 CFR 102-36.195 - What type of excess personal property may we furnish to our project grantees?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What type of excess personal property may we furnish to our project grantees? 102-36.195 Section 102-36.195 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT...
Signal systems asset management state-of-the-practice review
DOT National Transportation Integrated Search
2004-04-01
The purpose of this project is to obtain a better understanding of operations-level asset management by examining the specific case of signal systems. Key products will include: a synthesis of existing signal systems asset management practices; a gen...
Design and Data Management System at Johnson Space Center, Houston, Texas
NASA Technical Reports Server (NTRS)
Aronoff, Raymond
2002-01-01
The Design and Data Management System (DDMS) Project is a cooperative effort between Engineering and Information Systems whose overall objective is to move toward an integrated approach to collecting, managing, warehousing and accessing its engineering design data.
Latorre, Mariano; Silva, Herman; Saba, Juan; Guziolowski, Carito; Vizoso, Paula; Martinez, Veronica; Maldonado, Jonathan; Morales, Andrea; Caroca, Rodrigo; Cambiazo, Veronica; Campos-Vargas, Reinaldo; Gonzalez, Mauricio; Orellana, Ariel; Retamales, Julio; Meisel, Lee A
2006-01-01
Background Expressed sequence tag (EST) analyses provide a rapid and economical means to identify candidate genes that may be involved in a particular biological process. These ESTs are useful in many Functional Genomics studies. However, the large quantity and complexity of the data generated during an EST sequencing project can make the analysis of this information a daunting task. Results In an attempt to make this task friendlier, we have developed JUICE, an open source data management system (Apache + PHP + MySQL on Linux), which enables the user to easily upload, organize, visualize and search the different types of data generated in an EST project pipeline. In contrast to other systems, the JUICE data management system allows a branched pipeline to be established, modified and expanded, during the course of an EST project. The web interfaces and tools in JUICE enable the users to visualize the information in a graphical, user-friendly manner. The user may browse or search for sequences and/or sequence information within all the branches of the pipeline. The user can search using terms associated with the sequence name, annotation or other characteristics stored in JUICE and associated with sequences or sequence groups. Groups of sequences can be created by the user, stored in a clipboard and/or downloaded for further analyses. Different user profiles restrict the access of each user depending upon their role in the project. The user may have access exclusively to visualize sequence information, access to annotate sequences and sequence information, or administrative access. Conclusion JUICE is an open source data management system that has been developed to aid users in organizing and analyzing the large amount of data generated in an EST Project workflow. JUICE has been used in one of the first functional genomics projects in Chile, entitled "Functional Genomics in nectarines: Platform to potentiate the competitiveness of Chile in fruit exportation". However, due to its ability to organize and visualize data from external pipelines, JUICE is a flexible data management system that should be useful for other EST/Genome projects. The JUICE data management system is released under the Open Source GNU Lesser General Public License (LGPL). JUICE may be downloaded from or . PMID:17123449
Demonstrating artificial intelligence for space systems - Integration and project management issues
NASA Technical Reports Server (NTRS)
Hack, Edmund C.; Difilippo, Denise M.
1990-01-01
As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.
Building a Propulsion Experiment Project Management Environment
NASA Technical Reports Server (NTRS)
Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara
2004-01-01
What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.
Space Station Information Systems
NASA Technical Reports Server (NTRS)
Pittman, Clarence W.
1988-01-01
The utility of the Space Station is improved, the ability to manage and integrate its development and operation enhanced, and the cost and risk of developing the software for it is minimized by three major information systems. The Space Station Information System (SSIS) provides for the transparent collection and dissemination of operational information to all users and operators. The Technical and Management Information System (TMIS) provides all the developers with timely and consistent program information and a project management 'window' to assess the project status. The Software Support Environment (SSE) provides automated tools and standards to be used by all software developers. Together, these three systems are vital to the successful execution of the program.
System verification and validation: a fundamental systems engineering task
NASA Astrophysics Data System (ADS)
Ansorge, Wolfgang R.
2004-09-01
Systems Engineering (SE) is the discipline in a project management team, which transfers the user's operational needs and justifications for an Extremely Large Telescope (ELT) -or any other telescope-- into a set of validated required system performance characteristics. Subsequently transferring these validated required system performance characteris-tics into a validated system configuration, and eventually into the assembled, integrated telescope system with verified performance characteristics and provided it with "objective evidence that the particular requirements for the specified intended use are fulfilled". The latter is the ISO Standard 8402 definition for "Validation". This presentation describes the verification and validation processes of an ELT Project and outlines the key role System Engineering plays in these processes throughout all project phases. If these processes are implemented correctly into the project execution and are started at the proper time, namely at the very beginning of the project, and if all capabilities of experienced system engineers are used, the project costs and the life-cycle costs of the telescope system can be reduced between 25 and 50 %. The intention of this article is, to motivate and encourage project managers of astronomical telescopes and scientific instruments to involve the entire spectrum of Systems Engineering capabilities performed by trained and experienced SYSTEM engineers for the benefit of the project by explaining them the importance of Systems Engineering in the AIV and validation processes.
Origami: An Active Learning Exercise for Scrum Project Management
ERIC Educational Resources Information Center
Sibona, Christopher; Pourreza, Saba; Hill, Stephen
2018-01-01
Scrum is a popular project management model for iterative delivery of software that subscribes to Agile principles. This paper describes an origami active learning exercise to teach the principles of Scrum in management information systems courses. The exercise shows students how Agile methods respond to changes in requirements during project…
2001-02-16
New Center Network Deployment ribbon Cutting: from left to right: Maryland Edwards, Code JT upgrade project deputy task manager; Ed Murphy, foundry networks systems engineer; Bohdan Cmaylo, Code JT upgrade project task manager, Scott Santiago, Division Chief, Code JT; Greg Miller, Raytheon Network engineer and Frank Daras, Raytheon network engineering manager.
Marshall Space Flight Center In-House Earned Value System (EVS)
NASA Technical Reports Server (NTRS)
Smith, Donnie
2004-01-01
The Earned Value System (EVS) is a project management budgeting and scheduling process for in-house project and institutional applications. This viewgraph presentation includes images of the system's computer interface.
Enhanced project management tool
NASA Technical Reports Server (NTRS)
Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)
2012-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.
Dawson, Lucas; Elbakidze, Marine; Angelstam, Per; Gordon, Johanna
2017-07-15
Due to a long history of intensive land and water use, habitat networks for biodiversity conservation are generally degraded in Sweden. Landscape restoration (LR) is an important strategy for achieving representative and functional green infrastructures. However, outcomes of LR efforts are poorly studied, particularly the dynamics of LR governance and management. We apply systems thinking methods to a series of LR case studies to analyse the causal structures underlying LR governance and management in Sweden. We show that these structures appear to comprise of an interlinked system of at least three sets of drivers and four core processes. This system exhibits many characteristics of a transformative change towards an integrated, adaptive approach to governance and management. Key challenges for Swedish LR projects relate to institutional and regulatory flexibility, the timely availability of sufficient funds, and the management of learning and knowledge production processes. In response, successful project leaders develop several key strategies to manage complexity and risk, and enhance perceptions of the attractiveness of LR projects. Copyright © 2017 Elsevier Ltd. All rights reserved.
Convention Center Management: A Systems Analysis & Design Course Project
ERIC Educational Resources Information Center
Guidry, Brandi N.; Totaro, Michael W.
2011-01-01
A challenge faced by many instructors of systems analysis and design courses is the selection or development of projects that provide challenging, yet suitable, learning experiences for the students. Employing a system development project case in undergraduate MIS courses offers students a multitude of opportunities to experientially examine…
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Badger, W.; Beckman, C. S.; Beshers, G.; Hammerslag, D.; Kimball, J.; Kirslis, P. A.; Render, H.; Richards, P.; Terwilliger, R.
1984-01-01
The project to automate the management of software production systems is described. The SAGA system is a software environment that is designed to support most of the software development activities that occur in a software lifecycle. The system can be configured to support specific software development applications using given programming languages, tools, and methodologies. Meta-tools are provided to ease configuration. Several major components of the SAGA system are completed to prototype form. The construction methods are described.
Groundwater Data Package for Hanford Assessments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thorne, Paul D.; Bergeron, Marcel P.; Williams, Mark D.
2006-01-31
This report presents data and interpreted information that supports the groundwater module of the System Assessment Capability (SAC) used in Hanford Assessments. The objective of the groundwater module is to predict movement of radioactive and chemical contaminants through the aquifer to the Columbia River or other potential discharge locations. This data package is being revised as part of the deliverables under the Characterization of Systems Project (#49139) aimed at providing documentation for assessments being conducted under the Hanford Assessments Project (#47042). Both of these projects are components of the Groundwater Remediation and Closure Assessments Projects, managed by the Management andmore » Integration Project (#47043).« less
Good governance and sustainability: a case study from Pakistan.
Israr, Syed Muhammad; Islam, Anwar
2006-01-01
On the basis of a case study in Pakistan, the paper argues that good governance, characterized by transparency, accountability and meaningful community participation, plays a critical role in the sustainability of donor-funded health systems projects in the public health sector. The Family Health Project (FHP) (1992-1999), funded by the World Bank, has been used as a case study. Critical analysis of secondary data mainly obtained from the Department of Health (DoH) in the province of Sindh in Pakistan is the major tool used for the study. Data from other sources including the World Bank have also been used. The analysis reveals that the existing health care system could not fully absorb and sustain major "sociopolitical" thrusts of the project, meaningful community participation and "democratic" decision-making processes being the most important ones. The hierarchical structure and management process made it difficult to produce a sense of ownership of the project among all managers and the rank and file staff. The Provincial Health Development Center (PHDC) and District Health Development Centers (DHDCs) established by the FHP did not receive adequate financial and political support from DoH and the Ministry of Health to have much control of the project at the local level. Consequently, these Centers largely failed to institutionalize a continuing training program for district level health officials/professionals. Due to lack of political support, the District Health Management Teams (DHMTs) could not be institutionalized. Community participation in the DHMTs was symbolic rather than forceful. Improved coordination among all stakeholders, more stable and competent leadership, more meaningful community participation, greater devolution of project management to the district level, and better management of resources would have resulted in more effective and efficient implementation of the project. Based on these findings, the paper introduces a Sustainable Management Approach (SMA) as a tool that can be used to ensure the sustainability of health systems projects, particularly those funded by international organizations in developing countries. Good governance and a conducive organizational culture are important prerequisites for incorporating any new project within an existing system. This includes prior consensus building among all stakeholders, a meaningful and inclusive participatory planning, implementation and evaluation process involving communities, political commitment, and the identification and use of appropriate leadership for project management.
Continuous Risk Management: An Overview
NASA Technical Reports Server (NTRS)
Rosenberg, Linda; Hammer, Theodore F.
1999-01-01
Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.
NASA's Cryogenic Fluid Management Technology Project
NASA Technical Reports Server (NTRS)
Tramel, Terri L.; Motil, Susan M.
2008-01-01
The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.
Management of the Atmosphere Resource Recovery and Environmental Monitoring Project
NASA Technical Reports Server (NTRS)
Roman, Monsi; Perry, Jay; Howard, David
2013-01-01
The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.
75 FR 9250 - Notice of Public Meeting, BLM-Alaska Resource Advisory Council
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... Land Management, on a variety of planning and management issues associated with public land management.... Manager reports. Stimulus projects update. Alaska Land Information System. National Landscape Conservation System anniversary. Resource management planning. Other topics of interest to the RAC. All meetings are...
NASA Astrophysics Data System (ADS)
Liu, Yuling; Wang, Xiaoping; Zhu, Yuhui; Fei, Lanlan
2017-08-01
This paper introduces a Comprehensively Functional Integrated Management Information System designed for the Optical Engineering Major by the College of Optical Science and Engineering, Zhejiang University, which combines the functions of teaching, students learning, educational assessment and management. The system consists of 5 modules, major overview, online curriculum, experiment teaching management, graduation project management and teaching quality feedback. The major overview module introduces the development history, training program, curriculums and experiment syllabus and teaching achievements of optical engineering major in Zhejiang University. The Management Information System is convenient for students to learn in a mobile and personalized way. The online curriculum module makes it very easy for teachers to setup a website for new curriculums. On the website, teachers can help students on their problems about the curriculums in time and collect their homework online. The experiment teaching management module and the graduation project management module enables the students to fulfill their experiment process and graduation thesis under the help of their supervisors. Before students take an experiment in the lab, they must pass the pre-experiment quiz on the corresponding module. After the experiment, students need to submit the experiment report to the web server. Moreover, the module contains experiment process video recordings, which are very helpful to improve the effect of the experiment education. The management of the entire process of a student's graduation program, including the project selection, mid-term inspection, progress report of every two weeks, final thesis, et al, is completed by the graduation project management module. The teaching quality feedback module is not only helpful for teachers to know whether the education effect of curriculum is good or not, but also helpful for the administrators of the college to know whether the design of syllabus is reasonable or not. The Management Information System changes the management object from the education results to the entire education processes. And it improves the efficiency of the management. It provides an effective method to promote curriculum construction management by supervision and evaluation, which improves students' learning outcomes and the quality of curriculums. As a result, it promotes the quality system of education obviously.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maloney, J.; Kiepper, A.F.; Simonetta, R.J.
The volume examines monitoring and reporting procedures applicable to performance and productivity. The managers of three transit systems of varying sizes discuss how productivity has been increased within their systems. The Pittsburgh discussion reviews a variety of capital projects and management improvement initiatives undertaken by Port Authority Transit, including development of maintenance manuals and an absenteeism reduction project. The Houston discussion describes how the property used a management study to identify needed organizational change and restructuring. The Ann Arbor discussion focuses on a set of service standards and performance indicators adopted to focus the management improvement process.
Incorporating a social-ecological-technological systems (SETS) perspective to the adaptive management process requires that stakeholders and managers conceptualize restoration projects as part of coupled human and natural systems and assess underlying social drivers and accrued b...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Quinn, N.W.T.; Ortega, R.; Rahilly, P.
2011-12-17
The project has provided science-based tools for the long-term management of salinity in drainage discharges from wetlands to the San Joaquin River. The results of the project are being used to develop best management practices (BMP) and a decision support system to assist wetland managers adjust the timing of salt loads delivered to the San Joaquin River during spring drawdown. Adaptive drainage management scheduling has the potential to improve environmental compliance with salinity objectives in the Lower San Joaquin River by reducing the frequency of violation of Vernalis salinity standards, especially in dry and critically dry years. The paired approachmore » to project implementation whereby adaptively managed and traditional practices were monitored in a side-by-side fashion has provided a quantitative measure of the impacts of the project on the timing of salt loading to the San Joaquin River. The most significant accomplishments of the project has been the technology transfer to wetland biologists, ditch tenders and water managers within the Grasslands Ecological Area. This “learning by doing” has build local community capacity within the Grassland Water District and California Department of Fish and Game providing these institutions with new capability to assess and effectively manage salinity within their wetlands while simultaneously providing benefits to salinity management of the San Joaquin River.« less
7 CFR 3560.302 - Accounting, bookkeeping, budgeting, and financial management systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Financial Management § 3560.302 Accounting, bookkeeping, budgeting, and financial management systems. (a... the accounting system reflects the amount escrowed. (5) Regardless of the number or types of accounts... two or more housing projects as long as the borrower's accounting system segregates and tracks funds...
The SIMPSONS project: An integrated Mars transportation system
NASA Astrophysics Data System (ADS)
Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett
In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.
The SIMPSONS project: An integrated Mars transportation system
NASA Technical Reports Server (NTRS)
Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett
1992-01-01
In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.
Application of a cost/performance measurement system on a research aircraft project
NASA Technical Reports Server (NTRS)
Diehl, J. J.
1978-01-01
The fundamentals of the cost/performance management system used in the procurement of two tilt rotor aircraft for a joint NASA/Army research project are discussed. The contractor's reporting system and the GPO's analyses are examined. The use of this type of reporting system is assessed. Recommendations concerning the use of like systems on future projects are included.
The Relationship between Earned Value Management Metrics and Customer Satisfaction
ERIC Educational Resources Information Center
Plumer, David R.
2010-01-01
Information Technology (IT) products have a high rate of failure. Only 25% of IT projects were completed within budget and schedule, and 15% of completed projects were not operational. Researchers have not investigated the success of project management systems from the perspective of customer satisfaction. In this quantitative study, levels of…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... Economic Studies Research Proposal Process and Project Management AGENCY: U.S. Census Bureau, Commerce... Project Management System by visiting the CES Web site ( http://www.ces.census.gov/index/php ) and click...) and instructions should be directed to Dr. Brian P. Holly, Project Review Coordinator, Center for...
Academic Mobility Projects Management: Challenges for Ukrainian Professional Education
ERIC Educational Resources Information Center
Zabolotna, Oksana
2015-01-01
The article is devoted to the academic mobility projects management on the example of Pavlo Tychyna Uman State Pedagogical University in the Erasmus Mundus Projects, namely, EMINENCE and EMINENCE II. It has been pointed out that modern university is a constantly developing system possessing a hidden potential for innovations. Thus, the…
Software risk management through independent verification and validation
NASA Technical Reports Server (NTRS)
Callahan, John R.; Zhou, Tong C.; Wood, Ralph
1995-01-01
Software project managers need tools to estimate and track project goals in a continuous fashion before, during, and after development of a system. In addition, they need an ability to compare the current project status with past project profiles to validate management intuition, identify problems, and then direct appropriate resources to the sources of problems. This paper describes a measurement-based approach to calculating the risk inherent in meeting project goals that leverages past project metrics and existing estimation and tracking models. We introduce the IV&V Goal/Questions/Metrics model, explain its use in the software development life cycle, and describe our attempts to validate the model through the reverse engineering of existing projects.
Integration of structural health monitoring and asset management.
DOT National Transportation Integrated Search
2012-08-01
This project investigated the feasibility and potential benefits of the integration of infrastructure monitoring systems into enterprise-scale transportation management systems. An infrastructure monitoring system designed for bridges was implemented...
Integrating Agronomic Principles with Management Experience in Introductory Agronomy.
ERIC Educational Resources Information Center
Vorst, J. J.
1989-01-01
Explains the use of a cropping systems project to teach agronomic principles and crop management techniques, and to enhance communication skills. Provides a sample progress report instructions sheet which was used for the project. (Author/RT)
Rusnak, James E.
1987-01-01
Due to previous systems selections, many hospitals (health care facilities) are faced with the problem of fragmented data bases containing clinical, demographic and financial information. Projects to select and implement a Case Mix Management System (CMMS) provide an opportunity to reduce the number of separate physical files and to migrate towards systems with an integrated data base. The number of CMMS candidate systems is often restricted due to data base and system interface issues. The hospital must insure the CMMS project provides a means to implement an integrated on-line hospital information data base for use by departments in operating under a DRG-based Prospective Payment System. This paper presents guidelines for use in selecting a Case Mix Mangement System to meet the hospital's financial and operations planning, budgeting, marketing, and other management needs, while considering the data base implications of the implementation.
ERIC Educational Resources Information Center
Kerns, Dannie J.
2014-01-01
The qualitative phenomenological study explored the lived experiences of financial services industry change managers to understand the genesis of low data management information system project adoption rates. The goal of the study was to find methods to improve data management information system adoption rates. The participant pool consisted of 19…
Configuration management issues and objectives for a real-time research flight test support facility
NASA Technical Reports Server (NTRS)
Yergensen, Stephen; Rhea, Donald C.
1988-01-01
Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.
41 CFR 102-73.40 - What happens if the dollar value of the project exceeds the prospectus threshold?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What happens if the dollar value of the project exceeds the prospectus threshold? 102-73.40 Section 102-73.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 73-REAL ESTATE...
41 CFR 102-73.40 - What happens if the dollar value of the project exceeds the prospectus threshold?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What happens if the dollar value of the project exceeds the prospectus threshold? 102-73.40 Section 102-73.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 73-REAL ESTATE...
Combining Project Management Methods: A Case Study of Dlstributed Work Practices
NASA Astrophysics Data System (ADS)
Backlund, Per; Lundell, Björn
The increasing complexity of information systems development (ISD) projects call for improved project management practices. This, together with an endeavour to improve the success rate of ISD projects (Lyytinen and Robey 1999; Cooke-Davies 2002; White and Fortune 2002), has served as drivers for various efforts in process improvement such as the introduction of new development methods (Fitzgerald 1997; Iivari and Maansaari 1998).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moeckel, D.R.
A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerningmore » various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time.« less
Projecting technology change to improve space technology planning and systems management
NASA Astrophysics Data System (ADS)
Walk, Steven Robert
2011-04-01
Projecting technology performance evolution has been improving over the years. Reliable quantitative forecasting methods have been developed that project the growth, diffusion, and performance of technology in time, including projecting technology substitutions, saturation levels, and performance improvements. These forecasts can be applied at the early stages of space technology planning to better predict available future technology performance, assure the successful selection of technology, and improve technology systems management strategy. Often what is published as a technology forecast is simply scenario planning, usually made by extrapolating current trends into the future, with perhaps some subjective insight added. Typically, the accuracy of such predictions falls rapidly with distance in time. Quantitative technology forecasting (QTF), on the other hand, includes the study of historic data to identify one of or a combination of several recognized universal technology diffusion or substitution patterns. In the same manner that quantitative models of physical phenomena provide excellent predictions of system behavior, so do QTF models provide reliable technological performance trajectories. In practice, a quantitative technology forecast is completed to ascertain with confidence when the projected performance of a technology or system of technologies will occur. Such projections provide reliable time-referenced information when considering cost and performance trade-offs in maintaining, replacing, or migrating a technology, component, or system. This paper introduces various quantitative technology forecasting techniques and illustrates their practical application in space technology and technology systems management.
Distributed Information System Development: Review of Some Management Issues
NASA Astrophysics Data System (ADS)
Mishra, Deepti; Mishra, Alok
Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.
NASA Technical Reports Server (NTRS)
2004-01-01
NASA's complex and highly technical missions rely on effective project teams and managers. Since 1993, through its Project Management Development Process (PMDP), the Academy of Program and Project Leadership (APPL) has offered direction to the Agency's project practitioners as they advance in their careers. PMDP helps identify and sequence professional experiences, courses, and other project-based learning experiences that support individual career goals and center activities by outlining competencies at four levels of development. The result is that PMDP provides NASA project practitioners with a road map to the knowledge and competencies appropriate for their job and the jobs to which they aspire. Plus, new this year, APPL has rolled out its electronic Project Management Development Process (ePMDP) tool, a learning management system that includes a dynamic presentation of the PMDP levels, competency areas, competency organizational structures, Individual Development Plans (IDP), and online PMDP enrollment. APPL's website, www.appl.nasa.gov, provides access to ePMDP as well as other online resources for NASA practitioners enrolled in the Project Management Development Process.
Charting the Course: Life Cycle Management of Mars Mission Digital Information
NASA Technical Reports Server (NTRS)
Reiz, Julie M.
2003-01-01
This viewgraph presentation reviews the life cycle management of MER Project information. This process was an essential key to the successful launch of the MER Project rovers. Incorporating digital information archive requirements early in the project life cycle resulted in: Design of an information system that included archive metadata, Reduced the risk of information loss through in-process appraisal, Easier transfer of project information to institutional online archive and Project appreciation for preserving information for reuse by future projects
Production roll out plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adams, D.E.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects,more » General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.« less
Integrated Risk Management Within NASA Programs/Projects
NASA Technical Reports Server (NTRS)
Connley, Warren; Rad, Adrian; Botzum, Stephen
2004-01-01
As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.
Noble, Bram; Liu, Jialang; Hackett, Paul
2017-04-01
This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.
NASA Astrophysics Data System (ADS)
Detsis, Emmanouil; Brodsky, Yuval; Knudtson, Peter; Cuba, Manuel; Fuqua, Heidi; Szalai, Bianca
2012-11-01
Space assets have a unique opportunity to play a more active role in global resource management. There is a clear need to develop resource management tools in a global framework. Illegal, Unregulated and Unreported (IUU) fishing is placing pressure on the health and size of fishing stocks around the world. Earth observation systems can provide fishery management organizations with cost effective monitoring of large swaths of ocean. Project Catch is a fisheries management project based upon the complimentary, but independent Catch-VMS and Catch-GIS systems. Catch-VMS is a Vessel Monitoring System with increased fidelity over existing offerings. Catch-GIS is a Geographical Information System that combines VMS information with existing Earth Observation data and other data sources to identify Illegal, Unregulated and Unreported (IUU) fishing. Project Catch was undertaken by 19 Masters students from the 2010 class of the International Space University. In this paper, the space-based system architecture of Project Catch is presented and analyzed. The rationale for the creation of the system, as well as the engineering trade-off studies in its creation, are discussed. The Catch-VMS proposal was envisaged in order to address two specific problems: (1) the expansion of illegal fishing to high-latitude regions where existing satellite systems coverage is an issue and (2) the lack of coverage in remote oceanic regions due to reliance on coastal-based monitoring. Catch-VMS utilizes ship-borne transponders and hosted-payload receivers on a Global Navigation Satellite System in order to monitor the position and activity of compliant fishing vessels. Coverage is global and continuous with multiple satellites in view providing positional verification through multilateration techniques. The second part of the paper briefly describes the Catch-GIS system and investigates its cost of implementation.
Artificial intelligence - New tools for aerospace project managers
NASA Technical Reports Server (NTRS)
Moja, D. C.
1985-01-01
Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.
Development of a Carbon Management Geographic Information System (GIS) for the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Howard Herzog; Holly Javedan
In this project a Carbon Management Geographical Information System (GIS) for the US was developed. The GIS stored, integrated, and manipulated information relating to the components of carbon management systems. Additionally, the GIS was used to interpret and analyze the effect of developing these systems. This report documents the key deliverables from the project: (1) Carbon Management Geographical Information System (GIS) Documentation; (2) Stationary CO{sub 2} Source Database; (3) Regulatory Data for CCS in United States; (4) CO{sub 2} Capture Cost Estimation; (5) CO{sub 2} Storage Capacity Tools; (6) CO{sub 2} Injection Cost Modeling; (7) CO{sub 2} Pipeline Transport Costmore » Estimation; (8) CO{sub 2} Source-Sink Matching Algorithm; and (9) CO{sub 2} Pipeline Transport and Cost Model.« less
Tank waste remediation system configuration management implementation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
1998-03-31
The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less
Cooperative Projects - Challenges and Opportunities
NASA Astrophysics Data System (ADS)
Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja
2017-04-01
Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned challenges across several cooperative projects - a virtual centre for earth system science management (CESSMA).
Recent Improvement Of The Institutional Radioactive Waste Management System In Slovenia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sueiae, S.; Fabjan, M.; Hrastar, U.
2008-07-01
The task of managing institutional radioactive waste was assigned to the Slovenian National Agency for Radwaste Management by the Governmental Decree of May 1999. This task ranges from the collection of waste at users' premises to the storage in the Central Storage Facility in (CSF) and afterwards to the planned Low and Intermediate Level Waste (LILW) repository. By this Decree ARAO also became the operator of the CSF. The CSF has been in operation since 1986. Recent improvements of the institutional radioactive waste management system in Slovenia are presented in this paper. ARAO has been working on the reestablishment ofmore » institutional radioactive waste management since 1999. The Agency has managed to prepare the most important documents and carry out the basic activities required by the legislation to assure a safe and environmentally acceptable management of the institutional radioactive waste. With the aim to achieve a better organized operational system, ARAO took the advantage of the European Union Transition Facility (EU TF) financing support and applied for the project named 'Improvement of the management of institutional radioactive waste in Slovenia via the design and implementation of an Information Business System'. Through a public invitation for tenders one of the Slovenian largest software company gained the contract. Two international radwaste experts from Belgium were part of their project team. The optimization of the operational system has been carried out in 2007. The project was executed in ten months and it was divided into two phases. The first phase of the project was related with the detection of weaknesses and implementation of the necessary improvements in the current ARAO operational system. With the evaluation of the existing system, possible improvements were identified. In the second phase of the project the software system Information Business System (IBS) was developed and implemented by the group of IT experts. As a software development life-cycle methodology the Waterfall methodology was used. The reason for choosing this methodology lied in its simple approach: analyze the problem, design the solution, implement the code, test the code, integrate and deploy. ARAO's institutional radioactive waste management process was improved in the way that it is more efficient, better organized, allowing traceability and availability of all documents and operational procedures within the field of institutional radioactive waste. The tailored made IBS system links all activities of the institutional radioactive waste management process: collection, transportation, takeover, acceptance, storing, treatment, radiation protection, etc. into one management system. All existing and newly designed evidences, operational procedures and other documents can be searched and viewed via secured Internet access from different locations. (authors)« less
A Recipe for Streamlining Mission Management
NASA Technical Reports Server (NTRS)
Mitchell, Andrew E.; Semancik, Susan K.
2004-01-01
This paper describes a project's design and implementation for streamlining mission management with knowledge capture processes across multiple organizations of a NASA directorate. Thc project's focus is on standardizing processes and reports; enabling secure information access and case of maintenance; automating and tracking appropriate workflow rules through process mapping; and infusing new technologies. This paper will describe a small team's experiences using XML technologies through an enhanced vendor suite of applications integrated on Windows-based platforms called the Wallops Integrated Scheduling and Document Management System (WISDMS). This paper describes our results using this system in a variety of endeavors, including providing range project scheduling and resource management for a Range and Mission Management Office; implementing an automated Customer Feedback system for a directorate; streamlining mission status reporting across a directorate; and initiating a document management, configuration management and portal access system for a Range Safety Office's programs. The end result is a reduction of the knowledge gap through better integration and distribution of information, improved process performance, automated metric gathering, and quicker identification of problem areas and issues. However, the real proof of the pudding comes through overcoming the user's reluctance to replace familiar, seasoned processes with new technology ingredients blended with automated procedures in an untested recipe. This paper shares some of the team's observations that led to better implementation techniques, as well as an IS0 9001 Best Practices citation. This project has provided a unique opportunity to advance NASA's competency in new technologies, as well as to strategically implement them within an organizational structure, while wetting the appetite for continued improvements in mission management.
GSC configuration management plan
NASA Technical Reports Server (NTRS)
Withers, B. Edward
1990-01-01
The tools and methods used for the configuration management of the artifacts (including software and documentation) associated with the Guidance and Control Software (GCS) project are described. The GCS project is part of a software error studies research program. Three implementations of GCS are being produced in order to study the fundamental characteristics of the software failure process. The Code Management System (CMS) is used to track and retrieve versions of the documentation and software. Application of the CMS for this project is described and the numbering scheme is delineated for the versions of the project artifacts.
Management Of Optical Projects
NASA Astrophysics Data System (ADS)
Young, Peter S.; Olson, David R.
1981-03-01
This paper discusses the management of optical projects from the concept stage, beginning with system specifications, through design, optical fabrication and test tasks. Special emphasis is placed on effective coupling of design engineering with fabrication development and utilization of available technology. Contrasts are drawn between accepted formalized management techniques, the realities of dealing with fragile components and the necessity of an effective project team which integrates the special characteristics of highly skilled optical specialists including lens designers, optical engineers, opticians, and metrologists. Examples are drawn from the HEAO-2 X-Ray Telescope and Space Telescope projects.
A Proposed System of "Project Management" for Study Items.
ERIC Educational Resources Information Center
Worcester Public Schools, MA.
The purposes of the proposed system are to provide a standard operating procedure for a systematic and effective handling of project-type study items as differentiated from informational-type items; to assign definite singular responsibility for projects; to suggest specific sequential steps to be taken in the preparation of the project report;…
Options of system integrated environment modelling in the predicated dynamic cyberspace
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janková, Martina; Dvořák, Jiří
In this article there are briefly mentioned some selected options of contemporary conception of cybernetic system models in the corresponding and possible integratable environment with modern system dynamics thinking and all this in the cyberspace of possible projecting of predicted system characteristics. The key to new capabilities of system integration modelling in the considered cyberspace is mainly the ability to improve the environment and the system integration options, all this with the aim of modern control in the hierarchically arranged dynamic cyberspace, e.g. in the currently desired electronic business with information. The aim of this article is to assess generallymore » the trends in the use of modern modelling methods considering the cybernetics applications verified in practice, modern concept of project management and also the potential integration of artificial intelligence in the new projecting and project management of integratable and intelligent models, e.g. with the optimal structures and adaptable behaviour.The article results from the solution of a specific research partial task at the faculty; especially the moments proving that the new economics will be based more and more on information, knowledge system defined cyberspace of modern management, are stressed in the text.« less
1980-02-01
automatic data exchange ... 56 There are currently 12 Data Systems available: I. Integrated Disbursing and Accounting (IDA) 2. Integrated Program Management...construction project progress through the use of a CPM scheduling and progress reporting system . It automatically generates invoices for payment and payment...posted on the project. Water will be drained daily from tanks of vehicle air brake systems . Rtigging, hooks, pendants and slings will be examined
Software Tools Streamline Project Management
NASA Technical Reports Server (NTRS)
2009-01-01
Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query-Based Document Management (QBDM) is a tool that enables content or context searches, either simple or hierarchical, across a variety of databases. The system enables users to specify notification subscriptions where they associate "contexts of interest" and "events of interest" to one or more documents or collection(s) of documents. Based on these subscriptions, users receive notification when the events of interest occur within the contexts of interest for associated document or collection(s) of documents. Users can also associate at least one notification time as part of the notification subscription, with at least one option for the time period of notifications.
Development of GPS survey data management protocols/policy.
DOT National Transportation Integrated Search
2010-08-01
This project developed a statewide policy and criteria for collecting, analyzing, and managing global position system (GPS) survey data. The research project determined the needs of the Department in adopting the GPS real time kinetic (GPS RTK) stake...
Asset Management of Roadway Signs Through Advanced Technology
DOT National Transportation Integrated Search
2003-06-01
This research project aims to ease the process of Roadway Sign asset management. The project utilized handheld computer and global positioning system (GPS) technology to capture sign location data along with a timestamp. This data collection effort w...
2010-03-16
L TO R: DR. FRANCIS CHIARAMONTE, PROGRAM EXECUTIVE FOR PHYSICAL SCIENCES, ISS RESEARCH PROJECT, NASA HEADQUARTERS; DR. RAYMOND CLINTON, ACTING MANAGER FOR SCIENCE AND MISSION SYSTEMS OFFICE, NASA MARSHALL; DR. FRANK SZOFRAN, MICROGRAVITY MATERIALS SCIENCE PROJECT MANAGER AND DISCIPLINE SCIENTIST MATERIALS AND PROCESSES LABORATORY AT MSFC.
Control Systems for Information Systems Development Projects (Part I)
ERIC Educational Resources Information Center
Dickson, Gary W.
1970-01-01
Discusses control of management information systems and finds a similarity in management of research and development activity. Part II will appear in AEDS Journal, Volume 4, number 2, December 1970. (JF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eckerle, William; Hall, Stephen
2005-12-30
In 2002, Gnomon, Inc., entered into a cooperative agreement with the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) for a project entitled, Adaptive Management and Planning Models for Cultural Resources in Oil and Gas Fields in New Mexico and Wyoming (DE-FC26-02NT15445). This project, funded through DOE’s Preferred Upstream Management Practices grant program, examined cultural resource management practices in two major oil- and gas-producing areas, southeastern New Mexico and the Powder River Basin of Wyoming (Figure 1). The purpose of this project was to examine how cultural resources have been investigated and managed and to identify more effectivemore » management practices. The project also was designed to build information technology and modeling tools to meet both current and future management needs. The goals of the project were described in the original proposal as follows: Goal 1. Create seamless information systems for the project areas. Goal 2. Examine what we have learned from archaeological work in the southeastern New Mexico oil fields and whether there are better ways to gain additional knowledge more rapidly or at a lower cost. Goal 3. Provide useful sensitivity models for planning, management, and as guidelines for field investigations. Goal 4. Integrate management, investigation, and decision- making in a real-time electronic system. Gnomon, Inc., in partnership with the Wyoming State Historic Preservation Office (WYSHPO) and Western GeoArch Research, carried out the Wyoming portion of the project. SRI Foundation, in partnership with the New Mexico Historic Preservation Division (NMHPD), Statistical Research, Inc., and Red Rock Geological Enterprises, completed the New Mexico component of the project. Both the New Mexico and Wyoming summaries concluded with recommendations how cultural resource management (CRM) processes might be modified based on the findings of this research.« less
IS-ENES project management - lessons learnt
NASA Astrophysics Data System (ADS)
Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie
2017-04-01
IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.
Submittal for 2003 Project of the Year K Basins Fuel Transfer System Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
GERBER, M.S.
2003-01-29
Fluor Hanford, Inc. is pleased to submit the K Basins Fuel Transfer System (FTS) for consideration by the Project Management Institute as Project of the Year for 2003. The FTS involved installing a unique, unproven system in an inhospitable and deteriorating radiological and hazardous environment, under very stringent requirements and within an extremely condensed schedule, just 19 months, from authorization to full operations. The FTS, therefore, is an excellent example of effective project management, and the dynamic involvement of an integrated team representing a broad spectrum of personnel, disciplines, and services. The FTS is an integral and critical part ofmore » a larger project at Hanford -the Spent Nuclear Fuel Project (SNF). The mission of the SNF Project is to relocate used, or spent, nuclear fuel to safe interim storage, permanently dispose of radioactive debris in the K-Basins, and deactivate all related facilities and prepare them for demolition. Today, the FTS is being used to remove highly radioactive nuclear fuel from an aging, and potentially unstable storage in underground pools of water--the K-Basins--and safely transport it to a processing area to be cleaned, dried and sent to safe storage. The role the FTS plays in successfully completing the mission of the SNF Project is concrete evidence of the intrinsic value of project management and a testimonial to the innovation, ingenuity, and teamwork of many--from workers to management and subcontractors, and regulators to stakeholders. It's a true success story and one that will have a happy ending, safely eliminating the risk of potentially contaminating one of Washington state's most valuable natural resources, the Columbia River. This nomination is dedicated to that Project Team.« less
The PCP SYS IV Management System: Educational Overview.
ERIC Educational Resources Information Center
Siegel, Martin A.; Davis, Dennis M.
This paper describes the structure and function of the SYS IV PLATO Curriculum Project's (PCP) computer-based management system and justifies the system design. A consideration of features most critical in the design of management systems provides the context for a discussion of specific SYS IV features, which include its ability to deliver any…
Internship - practical education
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porell, A.L.; Bauman, H.F.
1989-01-01
The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less
Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects
ERIC Educational Resources Information Center
Vera, Gil; Daniel, Víctor; Awad, Gabriel
2015-01-01
The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…
Database Design Learning: A Project-Based Approach Organized through a Course Management System
ERIC Educational Resources Information Center
Dominguez, Cesar; Jaime, Arturo
2010-01-01
This paper describes an active method for database design learning through practical tasks development by student teams in a face-to-face course. This method integrates project-based learning, and project management techniques and tools. Some scaffolding is provided at the beginning that forms a skeleton that adapts to a great variety of…
An Exploratory Study of Risk Factors for Implementing Service-Oriented IS Projects
NASA Astrophysics Data System (ADS)
Chang, Hsin-Lu; Lue, Chia-Pei
For IS project managers, how to implement the projects successfully is always a challenge. Further, as more and more enterprises start to develop service-oriented IS projects, it is essential to assess the sources and impacts of relevant risks. This research aimed at identifying risk factors related to service-oriented IS projects and analyzing the impact of these risk factors. Applying the SIMM (service integrated maturity model) proposed by IBM, customer service systems were selected to justify the research framework. Result showed that the risk factors influencing the adoption of service-oriented systems were insufficient technology planning, lack of expertise, ineffective project governance, and organizational misalignment, listed in the order of strength of influence. The findings of this research is expected to assist managers realize the risks and the importance of these risks that have to be noticed and controlled when making decisions on service-oriented systems adoption.
Configuration Management Process Assessment Strategy
NASA Technical Reports Server (NTRS)
Henry, Thad
2014-01-01
Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*
Computerized Management Information and Reporting Systems for Sponsored Projects.
ERIC Educational Resources Information Center
Rodman, John A.; Peters, Carl M.
1980-01-01
The effective management of the university depends on the research office providing usable, accurate, timely, and accessible information regarding sponsored programs. The utilization of automated systems to store, access, and manage information is seen as essential. (MLW)
Optimization of knowledge-based systems and expert system building tools
NASA Technical Reports Server (NTRS)
Yasuda, Phyllis; Mckellar, Donald
1993-01-01
The objectives of the NASA-AMES Cooperative Agreement were to investigate, develop, and evaluate, via test cases, the system parameters and processing algorithms that constrain the overall performance of the Information Sciences Division's Artificial Intelligence Research Facility. Written reports covering various aspects of the grant were submitted to the co-investigators for the grant. Research studies concentrated on the field of artificial intelligence knowledge-based systems technology. Activities included the following areas: (1) AI training classes; (2) merging optical and digital processing; (3) science experiment remote coaching; (4) SSF data management system tests; (5) computer integrated documentation project; (6) conservation of design knowledge project; (7) project management calendar and reporting system; (8) automation and robotics technology assessment; (9) advanced computer architectures and operating systems; and (10) honors program.
Heterogeneous distributed query processing: The DAVID system
NASA Technical Reports Server (NTRS)
Jacobs, Barry E.
1985-01-01
The objective of the Distributed Access View Integrated Database (DAVID) project is the development of an easy to use computer system with which NASA scientists, engineers and administrators can uniformly access distributed heterogeneous databases. Basically, DAVID will be a database management system that sits alongside already existing database and file management systems. Its function is to enable users to access the data in other languages and file systems without having to learn the data manipulation languages. Given here is an outline of a talk on the DAVID project and several charts.
Construction Management Oversight Options for UMTA
DOT National Transportation Integrated Search
1983-11-01
At the request of UMTA, a study team was formed on July 29, 1983 at the Transportation Systems Center (TSC) to conduct a review of the project management and grant monitoring procedures employed by the UMTA Regional Offices in projects involving larg...
Managing laboratory automation in a changing pharmaceutical industry
Rutherford, Michael L.
1995-01-01
The health care reform movement in the USA and increased requirements by regulatory agencies continue to have a major impact on the pharmaceutical industry and the laboratory. Laboratory management is expected to improve effciency by providing more analytical results at a lower cost, increasing customer service, reducing cycle time, while ensuring accurate results and more effective use of their staff. To achieve these expectations, many laboratories are using robotics and automated work stations. Establishing automated systems presents many challenges for laboratory management, including project and hardware selection, budget justification, implementation, validation, training, and support. To address these management challenges, the rationale for project selection and implementation, the obstacles encountered, project outcome, and learning points for several automated systems recently implemented in the Quality Control Laboratories at Eli Lilly are presented. PMID:18925014
NASA Astrophysics Data System (ADS)
Dominik, Michael T.
The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.
NASA Astrophysics Data System (ADS)
Lorenzo Alvarez, Jose; Metselaar, Harold; Amiaux, Jerome; Saavedra Criado, Gonzalo; Gaspar Venancio, Luis M.; Salvignol, Jean-Christophe; Laureijs, René J.; Vavrek, Roland
2016-08-01
In the last years, the system engineering field is coming to terms with a paradigm change in the approach for complexity management. Different strategies have been proposed to cope with highly interrelated systems, system of systems and collaborative system engineering have been proposed and a significant effort is being invested into standardization and ontology definition. In particular, Model Based System Engineering (MBSE) intends to introduce methodologies for a systematic system definition, development, validation, deployment, operation and decommission, based on logical and visual relationship mapping, rather than traditional 'document based' information management. The practical implementation in real large-scale projects is not uniform across fields. In space science missions, the usage has been limited to subsystems or sample projects with modeling being performed 'a-posteriori' in many instances. The main hurdle for the introduction of MBSE practices in new projects is still the difficulty to demonstrate their added value to a project and whether their benefit is commensurate with the level of effort required to put them in place. In this paper we present the implemented Euclid system modeling activities, and an analysis of the benefits and limitations identified to support in particular requirement break-down and allocation, and verification planning at mission level.
Operations-oriented performance measures for freeway management systems : final report.
DOT National Transportation Integrated Search
2008-12-01
This report describes the second and final year activities of the project titled Using Operations-Oriented Performance Measures to Support Freeway Management Systems. Work activities included developing a prototype system architecture for testi...
On adaptive modified projective synchronization of a supply chain management system
NASA Astrophysics Data System (ADS)
Tirandaz, Hamed
2017-12-01
In this paper, the synchronization problem of a chaotic supply chain management system is studied. A novel adaptive modified projective synchronization method is introduced to control the behaviour of the leader supply chain system by a follower chaotic system and to adjust the leader system parameters until the measurable errors of the system parameters converge to zero. The stability evaluation and convergence analysis are carried out by the Lyapanov stability theorem. The proposed synchronization and antisynchronization techniques are studied for identical supply chain chaotic systems. Finally, some numerical simulations are presented to verify the effectiveness of the theoretical discussions.
Management Information System Project.
ERIC Educational Resources Information Center
Foley, Walter J.; Harr, Gordon G.
The Management Information System (MIS) described in this report represents a plan to utilize modern management techniques to facilitate the goal of a learner-responsive school system. The MIS component is being developed to meet the need for the coordination of the resources of staff, facilities, and time with the long range planning and…
SSME Advanced Health Management: Project Overview
NASA Technical Reports Server (NTRS)
Plowden, John
2000-01-01
This document is the viewgraphs from a presentation concerning the development of the Health Management system for the Space Shuttle Main Engine (SSME). It reviews the historical background of the SSME Advanced Health Management effort through the present final Health management configuration. The document includes reviews of three subsystems to the Advanced Health Management System: (1) the Real-Time Vibration Monitor System, (2) the Linear Engine Model, and (3) the Optical Plume Anomaly Detection system.
The Large Synoptic Survey Telescope project management control system
NASA Astrophysics Data System (ADS)
Kantor, Jeffrey P.
2012-09-01
The Large Synoptic Survey Telescope (LSST) program is jointly funded by the NSF, the DOE, and private institutions and donors. From an NSF funding standpoint, the LSST is a Major Research Equipment and Facilities (MREFC) project. The NSF funding process requires proposals and D&D reviews to include activity-based budgets and schedules; documented basis of estimates; risk-based contingency analysis; cost escalation and categorization. "Out-of-the box," the commercial tool Primavera P6 contains approximately 90% of the planning and estimating capability needed to satisfy R&D phase requirements, and it is customizable/configurable for remainder with relatively little effort. We describe the customization/configuration and use of Primavera for the LSST Project Management Control System (PMCS), assess our experience to date, and describe future directions. Examples in this paper are drawn from the LSST Data Management System (DMS), which is one of three main subsystems of the LSST and is funded by the NSF. By astronomy standards the LSST DMS is a large data management project, processing and archiving over 70 petabyes of image data, producing over 20 petabytes of catalogs annually, and generating 2 million transient alerts per night. Over the 6-year construction and commissioning phase, the DM project is estimated to require 600,000 hours of engineering effort. In total, the DMS cost is approximately 60% hardware/system software and 40% labor.
The dynamics of software development project management: An integrative systems dynamic perspective
NASA Technical Reports Server (NTRS)
Vandervelde, W. E.; Abdel-Hamid, T.
1984-01-01
Rather than continuing to focus on software development projects per se, the system dynamics modeling approach outlined is extended to investigate a broader set of issues pertaining to the software development organization. Rather than trace the life cycle(s) of one or more software projects, the focus is on the operations of a software development department as a continuous stream of software products are developed, placed into operation, and maintained. A number of research questions are ""ripe'' for investigating including: (1) the efficacy of different organizational structures in different software development environments, (2) personnel turnover, (3) impact of management approaches such as management by objectives, and (4) the organizational/environmental determinants of productivity.
Arterial catheter complications and management problems: observations from AACN's Thunder Project.
1993-09-01
Arterial cannulation, while common in critical care, is a procedure with attendant risks of complications. Anecdotal data from the American Association of Critical Care Nurses' Thunder Project provided evidence that catheters, insertion sites, and monitoring systems continue to be sources of complications. The problems have not changed since arterial cannulation began. Line management issues cannot be resolved until low-maintenance systems are developed.
Boundary Spanning in Offshored Information Systems Development Projects
ERIC Educational Resources Information Center
Krishnan, Poornima
2010-01-01
Recent growth in offshore outsourcing of information systems (IS) services is accompanied by managing the offshore projects successfully. Much of the project failures can be attributed to geographic and organizational boundaries which create differences in culture, language, work patterns, and decision making processes among the offshore project…
DOT National Transportation Integrated Search
2008-03-31
This Requirements Specification Document (RSD) was developed under the project titled TransGuide Integrated Corridor Management Stage 1 as part of the United States Department of Transportation (USDOT) Integrated Corridor Management (ICM) p...
Project #8, Task 2 - Travel Information Services (TIS), Definition Of Goals For The I-95 Corridor
DOT National Transportation Integrated Search
1995-01-23
CONTINUED FROM DOCUMENT NUMBER 6303 : RESEARCH AND DEVELOPMENT OR R&D, ELECTRONIC PAYMENT SYSTEMS, AUTOMATED FARE COLLECTION, EMERGENCY MANAGEMENT SERVICES OR EMS, FREEWAY MANAGEMENT SYSTEMS, INCIDENT MANAGEMENT/INCIDENT DETECTION : THE L-95 CORRI...
Eilbeck, Karen L; Lipstein, Julie; McGarvey, Sunanda; Staes, Catherine J
2014-01-01
The Reportable Condition Knowledge Management System (RCKMS) is envisioned to be a single, comprehensive, authoritative, real-time portal to author, view and access computable information about reportable conditions. The system is designed for use by hospitals, laboratories, health information exchanges, and providers to meet public health reporting requirements. The RCKMS Knowledge Representation Workgroup was tasked to explore the need for ontologies to support RCKMS functionality. The workgroup reviewed relevant projects and defined criteria to evaluate candidate knowledge domain areas for ontology development. The use of ontologies is justified for this project to unify the semantics used to describe similar reportable events and concepts between different jurisdictions and over time, to aid data integration, and to manage large, unwieldy datasets that evolve, and are sometimes externally managed.
Enhancement of the FDOT's project level and network level bridge management analysis tools
DOT National Transportation Integrated Search
2011-02-01
Over several years, the Florida Department of Transportation (FDOT) has been implementing the AASHTO Pontis Bridge Management System to support network-level and project-level decision making in the headquarters and district offices. Pontis is an int...
Report #17-P-0029, November 7, 2016. Ineffective project oversight could cause project delays that prolong the EPA's ability to provide emergency responders with data about hazardous waste shipped between generators’ sites and waste management facilities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon
Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developedmore » system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to establish the optimal O&M strategy at the program-level. • It can be applied to any other country or sector in the global environment.« less
Drainage facility management system : final report, June 2009.
DOT National Transportation Integrated Search
2009-06-01
This research project identified requirements for a drainage facility management system for the Oregon Department of Transportation. It also estimated the personnel resources needed to collect the inventory to populate such a system with data. A tota...
NASA Technical Reports Server (NTRS)
Muniz, R.; Hochstadt, J.; Boelke J.; Dalton, A.
2011-01-01
The Content Documents are created and managed under the System Software group with. Launch Control System (LCS) project. The System Software product group is lead by NASA Engineering Control and Data Systems branch (NEC3) at Kennedy Space Center. The team is working on creating Operating System Images (OSI) for different platforms (i.e. AIX, Linux, Solaris and Windows). Before the OSI can be created, the team must create a Content Document which provides the information of a workstation or server, with the list of all the software that is to be installed on it and also the set where the hardware belongs. This can be for example in the LDS, the ADS or the FR-l. The objective of this project is to create a User Interface Web application that can manage the information of the Content Documents, with all the correct validations and filters for administrator purposes. For this project we used one of the most excellent tools in agile development applications called Ruby on Rails. This tool helps pragmatic programmers develop Web applications with Rails framework and Ruby programming language. It is very amazing to see how a student can learn about OOP features with the Ruby language, manage the user interface with HTML and CSS, create associations and queries with gems, manage databases and run a server with MYSQL, run shell commands with command prompt and create Web frameworks with Rails. All of this in a real world project and in just fifteen weeks!
NASA Technical Reports Server (NTRS)
Vallee, J.; Wilson, T.
1976-01-01
Results are reported of the first experiments for a computer conference management information system at the National Aeronautics and Space Administration. Between August 1975 and March 1976, two NASA projects with geographically separated participants (NASA scientists) used the PLANET computer conferencing system for portions of their work. The first project was a technology assessment of future transportation systems. The second project involved experiments with the Communication Technology Satellite. As part of this project, pre- and postlaunch operations were discussed in a computer conference. These conferences also provided the context for an analysis of the cost of computer conferencing. In particular, six cost components were identified: (1) terminal equipment, (2) communication with a network port, (3) network connection, (4) computer utilization, (5) data storage and (6) administrative overhead.
NOSC (Naval Ocean Systems Center) Program Manager’s Handbook.
1986-07-01
impact downstream on other obligations-can wreck the best program through loss of performance, credibility, sponsorship, and future opportunity...planning sessions should be alert to external constraints that may impact on the timely completion of the project. Networking, through planning sessions...schedule, will have significant impact on the project. One of the most important functions of project management
Region and database management for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Data Integration 2000 Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract. It is based on the Commercial-Off-The-Shelf product solution with commercially proven business processes. The COTS product solution set, of PassPort and People Soft software, supports finance, supply and chemical management/Material Safety Data Sheet, human resources.
Spacecraft systems engineering: An introduction to the process at GSFC
NASA Technical Reports Server (NTRS)
Fragomeni, Tony; Ryschkewitsch, Michael G.
1993-01-01
The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.
Use of a Knowledge Management System in Waste Management Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gruendler, D.; Boetsch, W.U.; Holzhauer, U.
2006-07-01
In Germany the knowledge management system 'WasteInfo' about waste management and disposal issues has been developed and implemented. Beneficiaries of 'WasteInfo' are official decision makers having access to a large information pool. The information pool is fed by experts, so called authors This means compiling of information, evaluation and assigning of appropriate properties (metadata) to this information. The knowledge management system 'WasteInfo' has been introduced at the WM04, the operation of 'WasteInfo' at the WM05. The recent contribution describes the additional advantage of the KMS being used as a tool for the dealing with waste management projects. This specific aspectmore » will be demonstrated using a project concerning a comparative analysis of the implementation of repositories in six countries using nuclear power as examples: The information of 'WasteInfo' is assigned to categories and structured according to its origin and type of publication. To use 'WasteInfo' as a tool for the processing the projects, a suitable set of categories has to be developed for each project. Apart from technical and scientific aspects, the selected project deals with repository strategies and policies in various countries, with the roles of applicants and authorities in licensing procedures, with safety philosophy and with socio-economic concerns. This new point of view has to be modelled in the categories. Similar to this, new sources of information such as local and regional dailies or particular web-sites have to be taken into consideration. In this way 'WasteInfo' represents an open document which reflects the current status of the respective repository policy in several countries. Information with particular meaning for the German repository planning is marked and by this may influence the German strategy. (authors)« less
Was It Really Worth Pain? Refurbishment of Mercedes-Benz Trucks by Botswana Defence Force
2005-12-01
staff, especially those who were involved in rework, was their inability to access the fleet management system Mincom Ellipse database. Access to...CHAPTER IV This chapter analyzes the survey/questionnaires that were sent to the users, the project middle managers, and the CMER. The CMER was a de ...transferred directly to the BDF; they were accessed from a fund set up for the project. This enabled the project manager to have versatility in the
Information Technology Projects - Leaving the `Magic' to the `Wizards'
NASA Astrophysics Data System (ADS)
Bednar, Peter M.; Welch, Christine
In this chapter, we explore the significant challenges relating to investment in IT business. Information technology does not in itself deliver business value. We highlight the complexities that are often ignored in management of IT projects. If the management system in an organization is ineffective, then installing information technologies does not constitute a ‘magic wand' that will generate prosperity. It can only generate value if attention is paid to the design of the system for use at the same time that technological systems are developed. The authors explore how IT benefits require attention from management generally and show that investment in IT projects cannot be left to ‘IT experts' alone. We point out that undue reliance on rational planning is unsatisfactory, as it ignores contextual dependencies in organizational life. Criteria by which the success/failure of projects is to be judged must go beyond a focus on timescales, budgets, and ‘requirement specifications.' We suggest that the criteria need to be expanded to embrace usefulness of resultant systems, as perceived by organizational staff as they attempt to use them in carrying out their work.
Zhang, Yonghong; Sun, Weihong; Gutchell, Emily M; Kvecher, Leonid; Kohr, Joni; Bekhash, Anthony; Shriver, Craig D; Liebman, Michael N; Mural, Richard J; Hu, Hai
2013-01-01
In clinical and translational research as well as clinical trial projects, clinical data collection is prone to errors such as missing data, and misinterpretation or inconsistency of the data. A good quality assurance (QA) program can resolve many such errors though this requires efficient communications between the QA staff and data collectors. Managing such communications is critical to resolving QA problems but imposes a major challenge for a project involving multiple clinical and data processing sites. We have developed a QA issue tracking (QAIT) system to support clinical data QA in the Clinical Breast Care Project (CBCP). This web-based application provides centralized management of QA issues with role-based access privileges. It has greatly facilitated the QA process and enhanced the overall quality of the CBCP clinical data. As a stand-alone system, QAIT can supplement any other clinical data management systems and can be adapted to support other projects. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
DOT National Transportation Integrated Search
2000-08-01
Intelligent transportation systems (ITS) projects often need staff with skills that are not resident in traditional transportation organizations. Therefore, project administrators must sometimes look beyond the usual staffing methods to fill these po...
Making the most of MBSE: pragmatic model-based engineering for the SKA Telescope Manager
NASA Astrophysics Data System (ADS)
Le Roux, Gerhard; Bridger, Alan; MacIntosh, Mike; Nicol, Mark; Schnetler, Hermine; Williams, Stewart
2016-08-01
Many large projects including major astronomy projects are adopting a Model Based Systems Engineering approach. How far is it possible to get value for the effort involved in developing a model that accurately represents a significant project such as SKA? Is it possible for such a large project to ensure that high-level requirements are traceable through the various system-engineering artifacts? Is it possible to utilize the tools available to produce meaningful measures for the impact of change? This paper shares one aspect of the experience gained on the SKA project. It explores some of the recommended and pragmatic approaches developed, to get the maximum value from the modeling activity while designing the Telescope Manager for the SKA. While it is too early to provide specific measures of success, certain areas are proving to be the most helpful and offering significant potential over the lifetime of the project. The experience described here has been on the 'Cameo Systems Modeler' tool-set, supporting a SysML based System Engineering approach; however the concepts and ideas covered would potentially be of value to any large project considering a Model based approach to their Systems Engineering.
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
FAILSAFE Health Management for Embedded Systems
NASA Technical Reports Server (NTRS)
Horvath, Gregory A.; Wagner, David A.; Wen, Hui Ying; Barry, Matthew
2010-01-01
The FAILSAFE project is developing concepts and prototype implementations for software health management in mission- critical, real-time embedded systems. The project unites features of the industry-standard ARINC 653 Avionics Application Software Standard Interface and JPL s Mission Data System (MDS) technology (see figure). The ARINC 653 standard establishes requirements for the services provided by partitioned, real-time operating systems. The MDS technology provides a state analysis method, canonical architecture, and software framework that facilitates the design and implementation of software-intensive complex systems. The MDS technology has been used to provide the health management function for an ARINC 653 application implementation. In particular, the focus is on showing how this combination enables reasoning about, and recovering from, application software problems.
A model for international border management systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duggan, Ruth Ann
2008-09-01
To effectively manage the security or control of its borders, a country must understand its border management activities as a system. Using its systems engineering and security foundations as a Department of Energy National Security Laboratory, Sandia National Laboratories has developed such an approach to modeling and analyzing border management systems. This paper describes the basic model and its elements developed under Laboratory Directed Research and Development project 08-684.
ERIC Educational Resources Information Center
Mei, Jianyang
2016-01-01
This research project uses a large research university in the Midwest as a research site to explore the time management skills of international students and analyzes how using the Course Hack, an online Learning Management System (LMS) calendar tool, improves participants' time management skills and positively impacts their academic performance,…
Software Configuration Management Plan for the B-Plant Canyon Ventilation Control System
DOE Office of Scientific and Technical Information (OSTI.GOV)
MCDANIEL, K.S.
1999-08-31
Project W-059 installed a new B Plant Canyon Ventilation System. Monitoring and control of the system is implemented by the Canyon Ventilation Control System (CVCS). This Software Configuration Management Plan provides instructions for change control of the CVCS.
DOT National Transportation Integrated Search
2010-12-01
The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...
Urban Wood-Based Bio-Energy Systems in Seattle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stan Gent, Seattle Steam Company
2010-10-25
Seattle Steam Company provides thermal energy service (steam) to the majority of buildings and facilities in downtown Seattle, including major hospitals (Swedish and Virginia Mason) and The Northwest (Level I) Regional Trauma Center. Seattle Steam has been heating downtown businesses for 117 years, with an average length of service to its customers of 40 years. In 2008 and 2009 Seattle Steam developed a biomass-fueled renewable energy (bio-energy) system to replace one of its gas-fired boilers that will reduce greenhouse gases, pollutants and the amount of waste sent to landfills. This work in this sub-project included several distinct tasks associated withmore » the biomass project development as follows: a. Engineering and Architecture: Engineering focused on development of system control strategies, development of manuals for start up and commissioning. b. Training: The project developer will train its current operating staff to operate equipment and facilities. c. Flue Gas Clean-Up Equipment Concept Design: The concept development of acid gas emissions control system strategies associated with the supply wood to the project. d. Fuel Supply Management Plan: Development of plans and specifications for the supply of wood. It will include potential fuel sampling analysis and development of contracts for delivery and management of fuel suppliers and handlers. e. Integrated Fuel Management System Development: Seattle Steam requires a biomass Fuel Management System to track and manage the delivery, testing, processing and invoicing of delivered fuel. This application will be web-based and accessed from a password-protected URL, restricting data access and privileges by user-level.« less
R and D Productivity: New Challenges for the US Space Program
NASA Technical Reports Server (NTRS)
Baskin, O. W. (Editor); Sullivan, L. J. (Editor)
1985-01-01
Various topics related to research and development activities applicable to their U.S. space program are discussed. Project management, automatic control technology, human resources, management information systems, computer aided design, systems engineering, and personnel management were among the topics covered.
DOT National Transportation Integrated Search
2013-06-01
This System Design document for the US-75 Integrated Corridor Management (ICM) Program has been developed as part of the US Department of Transportation Integrated Corridor Management Initiative. The basic premise behind the ICM initiative is that in...
DOT National Transportation Integrated Search
2009-04-01
This project evaluates the process that was followed by MDOT and other stakeholders for the acquisition : of new Advanced Traffic Management System (ATMS) software aiming to integrate and facilitate the : management of various Intelligent Transportat...
NASA Technical Reports Server (NTRS)
Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.
2004-01-01
There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.
2012-08-01
CAPE CANAVERAL, Fla. - At a hangar near the Shuttle Landing Facility, or SLF, at NASA’s Kennedy Space Center in Florida, members of the media view the Morpheus prototype lander and speak with Morpheus managers. In front is Gregory Gaddis, Kennedy Project Morpheus/ALHAT site manager. To his left, are Jon Olansen, Johnson Space Center Project Morpheus manager and Chirold Epp, JSC ALHAT project manager. Testing of the prototype lander had been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free-flight test at Kennedy Space Center. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst rocks, craters and other hazards during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://morpheuslander.jsc.nasa.gov/. Photo credit: NASA/Kim Shiflett
The Environmental Geophysics Web Site and Geophysical Decision Support System (GDSS)
This product provides assistance to project managers, remedial project managers, stakeholders, and anyone interested in on-site investigations or environmental geophysics. The APM is the beta version of the new U.S. EPA Environmental Geophysics Web Site which includes the Geophys...
DOT National Transportation Integrated Search
2009-12-01
The goals of integration should be: Supporting domain oriented data analysis through the use of : knowledge augmented visual analytics system. In this project, we focus on: : Providing interactive data exploration for bridge managements. : ...
Stager, Ron; Chambers, Douglas; Wiatzka, Gerd; Dupre, Monica; Callough, Micah; Benson, John; Santiago, Erwin; van Veen, Walter
2017-04-01
The Port Hope Area Initiative is a project mandated and funded by the Government of Canada to remediate properties with legacy low-level radioactive waste contamination in the Town of Port Hope, Ontario. The management and use of large amounts of data from surveys of some 4800 properties is a significant task critical to the success of the project. A large amount of information is generated through the surveys, including scheduling individual field visits to the properties, capture of field data laboratory sample tracking, QA/QC, property report generation and project management reporting. Web-mapping tools were used to track and display temporal progress of various tasks and facilitated consideration of spatial associations of contamination levels. The IM system facilitated the management and integrity of the large amounts of information collected, evaluation of spatial associations, automated report reproduction and consistent application and traceable execution for this project.x. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Marine Corps Research and Development Objectives Document (RADOD)
1980-08-08
461.1 Data exchange /joint projects, evaluation of foreign weapon systems .......................... N/A MANAGEMENT SUPPORT 471.0 General management...DI3ZITiL WIDEBAND TtAMSISSION ;YSTem W2AK D~ CQ)43L CCC 9S22 AUTOMATED DATA ENTlY SYSTEM (AES) usM: CCC 9269 ORMBDAND 3MNDIRE:TID04AL VHF 4NTEM44...Standardization and Interoper- ability through data exchanges , joint projects, evaluation of foreign weapon systems , material or related technology. 461.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-06-01
This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oilymore » wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.« less
I-15 integrated corridor management : system requirements.
DOT National Transportation Integrated Search
2011-07-01
This document is intended as a listing and discussion of the Requirements for the I-15 Integrated Corridor Management System (ICMS) Demonstration Project in San Diego. This document describes what the system is to do (the functional requirements), ho...
Pavement management system for City of Madison.
DOT National Transportation Integrated Search
2016-11-01
This project aims to implement a pavement management system (PMS) for the City of Madison using : four specific objectives: 1) build a city-wide GIS database for PMS compatible and incorporable with the : citys GIS system; 2) identify feasible pav...
Knowledge Management Orientation: An Innovative Perspective to Hospital Management.
Ghasemi, Matina; Ghadiri Nejad, Mazyar; Bagzibagli, Kemal
2017-12-01
By considering innovation as a new project in hospitals, all the project management's standard steps should be followed in execution. This study investigated the validation of a new set of measures in terms of providing a procedure for knowledge management-oriented innovation that enriches the hospital management system. The relation between innovation and all the knowledge management areas, as the main constructs of project management, was illustrated by referring to project management standard steps and previous studies. Through consultations and meetings with a committee of professional project managers, a questionnaire was developed to measure ten knowledge management areas in hospital's innovation process. Additionally, a group of experts from hospital managers were invited to comment on the applicability of the questionnaires by considering if the items are measurable in hospitals practically. A close-ended, Likert-type scale items, consisted of ten sections, were developed based on project management body of knowledge thorough Delphi technique. It enables the managers to evaluate hospitals' situation to be aware whether the organization follows the knowledge management standards in innovation process or not. By pilot study, confirmatory factor analysis and exploratory factor analysis were conducted to ensure the validity and reliability of the measurement items. The developed items seem to have a potential to help hospital managers and subsequently delivering new products/services successfully based on the standard procedures in their organization. In all innovation processes, the knowledge management areas and their standard steps help hospital managers by a new tool as questionnaire format.
ERIC Educational Resources Information Center
Warner, Paul D.; Clearfield, Frank
The Green Thumb Project was designed to test the feasibility of operating a computerized system for disseminating weather, market, and other agricultural production and management information on a day-to-day basis; to develop a prototype software support system for the test; and to provide essential project information on conduct of the test to…
Knowledge management for chronic patient control and monitoring
NASA Astrophysics Data System (ADS)
Pedreira, Nieves; Aguiar-Pulido, Vanessa; Dorado, Julián; Pazos, Alejandro; Pereira, Javier
2014-10-01
Knowledge Management (KM) can be seen as the process of capturing, developing, sharing, and effectively using organizational knowledge. In this context, the work presented here proposes a KM System to be used in the scope of chronic patient control and monitoring for distributed research projects. It was designed in order to enable communication between patient and doctors, as well as to be usedbythe researchers involved in the project for its management. The proposed model integrates all the information concerning every patient and project management tasks in the Institutional Memory of a KMSystem and uses an ontology to maintain the information and its categorization independently. Furthermore, taking the philosophy of intelligent agents, the system will interact with the user to show him the information according to his preferences and access rights. Finally, three different scenarios of application are described.
P.L. Tedder; R.N. La Mont; J.C. Kincaid
1987-01-01
TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...
ERIC Educational Resources Information Center
Cechinel, Cristian
2014-01-01
This work presents a quantitative study of the use of a Learning Management System (LMS) by the professors of a distance learning course, focused on the guidance given for the students' Final Undergraduate Project. Data taken from the logs of 34 professors in two distinct virtual rooms were collected. After pre-processing the data, a series of…
2013-06-01
measuring numerical risk to the government ( Galway , 2004). However, quantitative risk analysis is rarely utilized in DoD acquisition programs because the...quantitative assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost...Kindle version]. Retrieved from Amazon.com 83 Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review
M855A1 Enhanced Performance Round (EPR) Media Day
2011-05-04
Distribution is unlimited. Other requests shall be referred to the Office of the Project Manager for Maneuver Ammunition Systems, ATTN: SFAE-AMO-MAS- SETI ... SETI ,Picatinny,NJ,07806-5000 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S...the Project Manager for Maneuver Ammunition Systems, ATTN: SFAE- AMO-MAS- SETI , Picatinny, NJ Distribution Statement A: Approved for Public Release
DOT National Transportation Integrated Search
2000-03-01
This case study is one of a series of case studies that examine procurement approaches used to deliver Intelligent Transportation System (ITS) projects. ITS projects are often complex and leverage the latest technology in telecommunications, computer...
Satellite based Ocean Forecasting, the SOFT project
NASA Astrophysics Data System (ADS)
Stemmann, L.; Tintoré, J.; Moneris, S.
2003-04-01
The knowledge of future oceanic conditions would have enormous impact on human marine related areas. For such reasons, a number of international efforts are being carried out to obtain reliable and manageable ocean forecasting systems. Among the possible techniques that can be used to estimate the near future states of the ocean, an ocean forecasting system based on satellite imagery is developped through the Satelitte based Ocean ForecasTing project (SOFT). SOFT, established by the European Commission, considers the development of a forecasting system of the ocean space-time variability based on satellite data by using Artificial Intelligence techniques. This system will be merged with numerical simulation approaches, via assimilation techniques, to get a hybrid SOFT-numerical forecasting system of improved performance. The results of the project will provide efficient forecasting of sea-surface temperature structures, currents, dynamic height, and biological activity associated to chlorophyll fields. All these quantities could give valuable information on the planning and management of human activities in marine environments such as navigation, fisheries, pollution control, or coastal management. A detailed identification of present or new needs and potential end-users concerned by such an operational tool is being performed. The project would study solutions adapted to these specific needs.
NASA Technical Reports Server (NTRS)
Phillips, Veronica J.
2017-01-01
The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.
Construction manpower management system.
DOT National Transportation Integrated Search
1990-01-01
This report traces the development of and explains the operation of a Construction Manpower Management System (CMMS) developed for the Virginia Department of Transportation (VDOT). Initial direction for this project was received from the Construction...
75 FR 29307 - Web Based Supply Chain Management Commodity Offer Form, Paperwork Collection Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Doc. No FV10-CP-01, AMS-FV-10-0041] Web... collection request is required for the implementation of a new system named Web Based Supply Chain Management...-2782. Mail: David Tuckwiller, Project Manager, Web Based Supply Chain Management System, Agricultural...
NASA Technical Reports Server (NTRS)
Schramm, Harry F.; Sullivan, Kenneth W.
1991-01-01
An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.
Reducing Risk for the Next Generation Nuclear Plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
John M. Beck II; Harold J. Heydt; Emmanuel O. Opare
2010-07-01
The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project.more » Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.« less
NASA Technical Reports Server (NTRS)
Nguyen, Hung D.; Steele, Gynelle C.
2017-01-01
This report is intended to help NASA program and project managers incorporate Small Business Innovation Research Small Business Technology Transfer (SBIR/STTR) technologies into NASA Human Exploration and Operations Mission Directorate (HEOMD) projects. Other Government and commercial projects managers can also find this useful. Space Transportation; Life Support and Habitation Systems; Extra-Vehicular Activity; High EfficiencySpace Power; Human Exploration and Operations Mission,
ERIC Educational Resources Information Center
Cronshey, Raymond W.; Dunklau, M. William
This booklet describes the Daily Production Reports subsystem of the School Food Management System, a computer program package developed as one part of a family of educational management systems. The Daily Production Reports system produces two major types of reports on a daily basis. Business Analysis Reports display all food service costs, as…
23 CFR 511.307 - Eligibility for Federal funding.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the development and implementation of a real-time information program. (b) Those project applications... applications to establish a real-time information program for non-Interstate highways are entitled to a Federal... MANAGEMENT REAL-TIME SYSTEM MANAGEMENT INFORMATION PROGRAM Real-Time System Management Information Program...
Managing Automation: A Process, Not a Project.
ERIC Educational Resources Information Center
Hoffmann, Ellen
1988-01-01
Discussion of issues in management of library automation includes: (1) hardware, including systems growth and contracts; (2) software changes, vendor relations, local systems, and microcomputer software; (3) item and authority databases; (4) automation and library staff, organizational structure, and managing change; and (5) environmental issues,…
Intelligent Resource Management for Local Area Networks: Approach and Evolution
NASA Technical Reports Server (NTRS)
Meike, Roger
1988-01-01
The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.
Data management plan for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.
The pioneer projects: Economical exploration of the solar system
NASA Technical Reports Server (NTRS)
Spahr, J. R.; Hall, C. F.
1975-01-01
The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.
NASA Astrophysics Data System (ADS)
McCord, P. F.; Evans, T. P.; Dell'Angelo, J.; Gower, D.; McBride, L.; Caylor, K. K.
2013-12-01
Climate change processes are projected to change the availability and seasonality of streamflow with dramatic implications for irrigated agricultural systems. Within mountain environments, this alteration in water availability may be quite pronounced over a relatively short distance as upstream users with first access to river water directly impact the availability of water to downstream users. Livelihood systems that directly depend on river water for both domestic consumption and practices such as irrigated agriculture are particularly vulnerable. The Mount Kenya region is an exemplary case of a semi-arid upstream-downstream system in which water availability rapidly decreases and directly impacts the livelihoods of river water users existing across this steep environmental gradient. To effectively manage river water within these water-scarce environs, water projects have been established along the major rivers of the Mount Kenya region. These water projects are responsible for managing water within discrete sub-catchments of the region. While water projects develop rules that encourage the responsible use of water and maintenance of the project itself, the efficiency of water allocation to the projects' members remains unclear. This research analyzes water projects from five sub-catchments on the northwest slopes of Mount Kenya. It utilizes data from household surveys and water project management surveys as well as stream gauge data and flow measurements within individual water projects to assess the governance structure and performance of water projects. The performance of water projects is measured through a variety of household level metrics including: farm-level water flow and volume over time, mean and variability in maize yield, per capita crop productivity, household-level satisfaction with water availability, number of days where water volume was insufficient for irrigation, and quantity harvested compared with expected quantity harvested. We present results demonstrating the heterogeneity of these individual measures and discuss the influence of topography, network design, household behaviors and water governance on the overall performance of these water projects. This work is the foundation for an agent-based model of these water projects that investigates the impact of climate change and population pressure on sustained agricultural production in the region. Additionally, the study highlights the utility of pairing distinct fields of scholarship by utilizing both survey responses and hydrological data to study complex social-ecological systems. This pairing allows for insights regarding governance structures that are effectively managing river water in the present and helps to understand the structures that may be suitable for future water management.
Using tailored methodical approaches to achieve optimal science outcomes
NASA Astrophysics Data System (ADS)
Wingate, Lory M.
2016-08-01
The science community is actively engaged in research, development, and construction of instrumentation projects that they anticipate will lead to new science discoveries. There appears to be very strong link between the quality of the activities used to complete these projects, and having a fully functioning science instrument that will facilitate these investigations.[2] The combination of using internationally recognized standards within the disciplines of project management (PM) and systems engineering (SE) has been demonstrated to lead to achievement of positive net effects and optimal project outcomes. Conversely, unstructured, poorly managed projects will lead to unpredictable, suboptimal project outcomes ultimately affecting the quality of the science that can be done with the new instruments. The proposed application of these two specific methodical approaches, implemented as a tailorable suite of processes, are presented in this paper. Project management (PM) is accepted worldwide as an effective methodology used to control project cost, schedule, and scope. Systems engineering (SE) is an accepted method that is used to ensure that the outcomes of a project match the intent of the stakeholders, or if they diverge, that the changes are understood, captured, and controlled. An appropriate application, or tailoring, of these disciplines can be the foundation upon which success in projects that support science can be optimized.
Maximizing the Independence of Deaf-Blind Teenagers.
ERIC Educational Resources Information Center
Venn, J. J.; Wadler, F.
1990-01-01
The Independent Living Project for Deaf/Blind Youth emphasized the teaching of home management, personal management, social/emotional skills, work skills, and communication skills to increase low-functioning teenagers' autonomy. The project included an independent living apartment in which a video monitoring system was used for indirect…
Automatic Ammunition Identification Technology Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weil, B.
1993-01-01
The Automatic Ammunition Identification Technology (AAIT) Project is an activity of the Robotics Process Systems Division at the Oak Ridge National Laboratory (ORNL) for the US Army's Project Manager-Ammunition Logistics (PM-AMMOLOG) at the Picatinny Arsenal in Picatinny, New Jersey. The project objective is to evaluate new two-dimensional bar code symbologies for potential use in ammunition logistics systems and automated reloading equipment. These new symbologies are a significant improvement over typical linear bar codes since machine-readable alphanumeric messages up to 2000 characters long are achievable. These compressed data symbologies are expected to significantly improve logistics and inventory management tasks and permitmore » automated feeding and handling of ammunition to weapon systems. The results will be increased throughout capability, better inventory control, reduction of human error, lower operation and support costs, and a more timely re-supply of various weapon systems. This paper will describe the capabilities of existing compressed data symbologies and the symbol testing activities being conducted at ORNL for the AAIT Project.« less
Automatic Ammunition Identification Technology Project. Ammunition Logistics Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weil, B.
1993-03-01
The Automatic Ammunition Identification Technology (AAIT) Project is an activity of the Robotics & Process Systems Division at the Oak Ridge National Laboratory (ORNL) for the US Army`s Project Manager-Ammunition Logistics (PM-AMMOLOG) at the Picatinny Arsenal in Picatinny, New Jersey. The project objective is to evaluate new two-dimensional bar code symbologies for potential use in ammunition logistics systems and automated reloading equipment. These new symbologies are a significant improvement over typical linear bar codes since machine-readable alphanumeric messages up to 2000 characters long are achievable. These compressed data symbologies are expected to significantly improve logistics and inventory management tasks andmore » permit automated feeding and handling of ammunition to weapon systems. The results will be increased throughout capability, better inventory control, reduction of human error, lower operation and support costs, and a more timely re-supply of various weapon systems. This paper will describe the capabilities of existing compressed data symbologies and the symbol testing activities being conducted at ORNL for the AAIT Project.« less
HARMFUL ALGAL BLOOMS OBSERVING SYSTEM PILOT PROJECT
The HABSOS Pilot Project is being developed through a partnership of federal, state and academic organizations as proof-of-concept for a coastal observing system in the Gulf of Mexico. The goal is to design a HAB data management system and develop the regional communication infra...
Experience Of Implementing The Integrated Management System In Manufacturing Companies In Slovakia
NASA Astrophysics Data System (ADS)
Lestyánszka Škůrková, Katarína; Kučerová, Marta; Fidlerová, Helena
2015-06-01
In corporate practice, the term of Integrated Management System means a system the aim of which is to manage an organization regarding the quality, environment, health and safety at work. In the first phase of the VEGA project No. 1/0448/13 "Transformation of ergonomics program into the company management structure through interaction and utilization QMS, EMS, HSMS", we focused on obtaining information about the way or procedure of implementing the integrated management systems in manufacturing companies in Slovakia. The paper considers characteristics of integrated management system, specifies the possibilities for successive integration of the management systems and also describes the essential aspects of the practical implementation of integrated management systems in companies in Slovakia.
Eilbeck, Karen L.; Lipstein, Julie; McGarvey, Sunanda; Staes, Catherine J.
2014-01-01
The Reportable Condition Knowledge Management System (RCKMS) is envisioned to be a single, comprehensive, authoritative, real-time portal to author, view and access computable information about reportable conditions. The system is designed for use by hospitals, laboratories, health information exchanges, and providers to meet public health reporting requirements. The RCKMS Knowledge Representation Workgroup was tasked to explore the need for ontologies to support RCKMS functionality. The workgroup reviewed relevant projects and defined criteria to evaluate candidate knowledge domain areas for ontology development. The use of ontologies is justified for this project to unify the semantics used to describe similar reportable events and concepts between different jurisdictions and over time, to aid data integration, and to manage large, unwieldy datasets that evolve, and are sometimes externally managed. PMID:25954354
DOE Office of Scientific and Technical Information (OSTI.GOV)
Singh, Ravindra; Reilly, James T.; Wang, Jianhui
Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to commonmore » barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.« less
Management approach recommendations. Earth Observatory Satellite system definition study (EOS)
NASA Technical Reports Server (NTRS)
1974-01-01
Management analyses and tradeoffs were performed to determine the most cost effective management approach for the Earth Observatory Satellite (EOS) Phase C/D. The basic objectives of the management approach are identified. Some of the subjects considered are as follows: (1) contract startup phase, (2) project management control system, (3) configuration management, (4) quality control and reliability engineering requirements, and (5) the parts procurement program.
ENVIRONMENTAL INFORMATION MANAGEMENT SYSTEM (EIMS)
The Environmental Information Management System (EIMS) organizes descriptive information (metadata) for data sets, databases, documents, models, projects, and spatial data. The EIMS design provides a repository for scientific documentation that can be easily accessed with standar...
Weather responsive traffic signal timing in Utah Department of Transportation.
DOT National Transportation Integrated Search
1993-06-01
The Design of Support Systems for Advanced Traffic Management Systems Project is a five-year program to define, design, and field test prototype systems to support the multitude of functions within Traffic Management Centers (TMC). Mature TMCs of the...
Power Electronics Thermal Management Research: Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moreno, Gilberto
The objective for this project is to develop thermal management strategies to enable efficient and high-temperature wide-bandgap (WBG)-based power electronic systems (e.g., emerging inverter and DC-DC converter). Reliable WBG devices are capable of operating at elevated temperatures (≥ 175 °Celsius). However, packaging WBG devices within an automotive inverter and operating them at higher junction temperatures will expose other system components (e.g., capacitors and electrical boards) to temperatures that may exceed their safe operating limits. This creates challenges for thermal management and reliability. In this project, system-level thermal analyses are conducted to determine the effect of elevated device temperatures on invertermore » components. Thermal modeling work is then conducted to evaluate various thermal management strategies that will enable the use of highly efficient WBG devices with automotive power electronic systems.« less
Valuing flexibilities in the design of urban water management systems.
Deng, Yinghan; Cardin, Michel-Alexandre; Babovic, Vladan; Santhanakrishnan, Deepak; Schmitter, Petra; Meshgi, Ali
2013-12-15
Climate change and rapid urbanization requires decision-makers to develop a long-term forward assessment on sustainable urban water management projects. This is further complicated by the difficulties of assessing sustainable designs and various design scenarios from an economic standpoint. A conventional valuation approach for urban water management projects, like Discounted Cash Flow (DCF) analysis, fails to incorporate uncertainties, such as amount of rainfall, unit cost of water, and other uncertainties associated with future changes in technological domains. Such approach also fails to include the value of flexibility, which enables managers to adapt and reconfigure systems over time as uncertainty unfolds. This work describes an integrated framework to value investments in urban water management systems under uncertainty. It also extends the conventional DCF analysis through explicit considerations of flexibility in systems design and management. The approach incorporates flexibility as intelligent decision-making mechanisms that enable systems to avoid future downside risks and increase opportunities for upside gains over a range of possible futures. A water catchment area in Singapore was chosen to assess the value of a flexible extension of standard drainage canals and a flexible deployment of a novel water catchment technology based on green roofs and porous pavements. Results show that integrating uncertainty and flexibility explicitly into the decision-making process can reduce initial capital expenditure, improve value for investment, and enable decision-makers to learn more about system requirements during the lifetime of the project. Copyright © 2013 Elsevier Ltd. All rights reserved.
Kitson, Alison; Silverston, Heidi; Wiechula, Rick; Zeitz, Kathryn; Marcoionni, Danni; Page, Tammy
2011-05-01
To describe the experiences of 14 clinical nursing leaders introducing a knowledge translation (KT) project into one metropolitan acute care hospital in South Australia. The study also explored team members' and service managers' experiences. KT strategies assume that local (nursing) clinical leaders have the capacity and capability to champion innovation combining positional leadership roles (ward leader) with a project lead role. There is limited evidence to support these assumptions. Semi-structured interviews of clinical nursing leaders and managers were undertaken at month 4 and 12 of the project. Data were also collected from the interdisciplinary team members (n = 28). Clinical nursing leaders identified risks and anxieties associated with taking on an additional leadership role, whereas managers acknowledged the multiple pressures on the system and the need for local level innovation. Team members generally reported positive experiences. With support, clinical nursing leaders can effectively embrace KT project leadership roles that complement their positional leadership roles. Clinical nursing leaders' experiences differed from nursing and medical managers' experiences. Managers need to be more attuned to the personal risks local leaders experience, providing support for leaders to experiment and innovate. Managers need to integrate local priorities with broader system wide agendas. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.
qPortal: A platform for data-driven biomedical research.
Mohr, Christopher; Friedrich, Andreas; Wojnar, David; Kenar, Erhan; Polatkan, Aydin Can; Codrea, Marius Cosmin; Czemmel, Stefan; Kohlbacher, Oliver; Nahnsen, Sven
2018-01-01
Modern biomedical research aims at drawing biological conclusions from large, highly complex biological datasets. It has become common practice to make extensive use of high-throughput technologies that produce big amounts of heterogeneous data. In addition to the ever-improving accuracy, methods are getting faster and cheaper, resulting in a steadily increasing need for scalable data management and easily accessible means of analysis. We present qPortal, a platform providing users with an intuitive way to manage and analyze quantitative biological data. The backend leverages a variety of concepts and technologies, such as relational databases, data stores, data models and means of data transfer, as well as front-end solutions to give users access to data management and easy-to-use analysis options. Users are empowered to conduct their experiments from the experimental design to the visualization of their results through the platform. Here, we illustrate the feature-rich portal by simulating a biomedical study based on publically available data. We demonstrate the software's strength in supporting the entire project life cycle. The software supports the project design and registration, empowers users to do all-digital project management and finally provides means to perform analysis. We compare our approach to Galaxy, one of the most widely used scientific workflow and analysis platforms in computational biology. Application of both systems to a small case study shows the differences between a data-driven approach (qPortal) and a workflow-driven approach (Galaxy). qPortal, a one-stop-shop solution for biomedical projects offers up-to-date analysis pipelines, quality control workflows, and visualization tools. Through intensive user interactions, appropriate data models have been developed. These models build the foundation of our biological data management system and provide possibilities to annotate data, query metadata for statistics and future re-analysis on high-performance computing systems via coupling of workflow management systems. Integration of project and data management as well as workflow resources in one place present clear advantages over existing solutions.
NASA Astrophysics Data System (ADS)
Francois, Baptiste; Hingray, Benoit; Creutin, Jean-Dominique; Hendrickx, Frederic
2015-04-01
The performance of water systems used worldwide for the management of water resources is expected to be influenced by future changes in regional climates and water uses. Anticipating possible performance changes of a given system requires a modeling chain simulating its management. Operational management is usually not trivial especially when several conflicting objectives have to be accounted for. Management models are therefore often a crude representation of the real system and they only approximate its performance. Estimated performance changes are expected to depend on the management model used, but this is often not assessed. This communication analyzes the influence of the management strategy representation on the performance of an Alpine reservoir (Serre-Ponçon, South-East of France) for which irrigation supply, hydropower generation and recreational activities are the main objectives. We consider three ways to construct the strategy named as clear-, short- and far-sighted management. They are based on different forecastability degrees of seasonal inflows into the reservoir. The strategies are optimized using a Dynamic Programming algorithm (deterministic for clear-sighted and implicit stochastic for short- and far-sighted). System performance is estimated for an ensemble of future hydro-meteorological projections obtained in the RIWER2030 research project (http://www.lthe.fr/RIWER2030/) from a suite of climate experiments from the EU - ENSEMBLES research project. Our results show that changes in system performance is much more influenced by changes in hydro-meteorological variables than by the choice of strategy modeling. They also show that a simple strategy representation (i.e. clear-sighted management) leads to similar estimates of performance modifications than those obtained with a representation supposedly closer to real world (i.e. the far-sighted management). The Short-Sighted management approach lead to significantly different results, especially when inter-annual inflow variability is high. Key words: Climate change, water resource, impact, management strategy modelling
Management of the Space Physics Analysis Network (SPAN)
NASA Technical Reports Server (NTRS)
Green, James L.; Thomas, Valerie L.; Butler, Todd F.; Peters, David J.; Sisson, Patricia L.
1990-01-01
Here, the purpose is to define the operational management structure and to delineate the responsibilities of key Space Physics Analysis Network (SPAN) individuals. The management structure must take into account the large NASA and ESA science research community by giving them a major voice in the operation of the system. Appropriate NASA and ESA interfaces must be provided so that there will be adequate communications facilities available when needed. Responsibilities are delineated for the Advisory Committee, the Steering Committee, the Project Scientist, the Project Manager, the SPAN Security Manager, the Internetwork Manager, the Network Operations Manager, the Remote Site Manager, and others.
Leaf LIMS: A Flexible Laboratory Information Management System with a Synthetic Biology Focus.
Craig, Thomas; Holland, Richard; D'Amore, Rosalinda; Johnson, James R; McCue, Hannah V; West, Anthony; Zulkower, Valentin; Tekotte, Hille; Cai, Yizhi; Swan, Daniel; Davey, Robert P; Hertz-Fowler, Christiane; Hall, Anthony; Caddick, Mark
2017-12-15
This paper presents Leaf LIMS, a flexible laboratory information management system (LIMS) designed to address the complexity of synthetic biology workflows. At the project's inception there was a lack of a LIMS designed specifically to address synthetic biology processes, with most systems focused on either next generation sequencing or biobanks and clinical sample handling. Leaf LIMS implements integrated project, item, and laboratory stock tracking, offering complete sample and construct genealogy, materials and lot tracking, and modular assay data capture. Hence, it enables highly configurable task-based workflows and supports data capture from project inception to completion. As such, in addition to it supporting synthetic biology it is ideal for many laboratory environments with multiple projects and users. The system is deployed as a web application through Docker and is provided under a permissive MIT license. It is freely available for download at https://leaflims.github.io .
Integrated, automated revenue management for managed care contracts.
Burckhart, Kent
2002-04-01
Faced with increasing managed care penetration and declining net revenue in recent years, healthcare providers increasingly are emphasizing revenue management. To streamline processes and reduce costs in this area, many healthcare providers have implemented or are considering automated contract management systems. When selecting such a system, healthcare financial managers should make certain that the system can interface with both patient-accounting and decision-support systems of the organization. This integration enhances a healthcare provider's financial viability by providing integrated revenue-management capabilities to analyze projected performance of proposed managed care contracts and actual performance of existing contracts.
Human Systems Integration in Practice: Constellation Lessons Learned
NASA Technical Reports Server (NTRS)
Zumbado, Jennifer Rochlis
2012-01-01
NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
DOT National Transportation Integrated Search
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
DOT National Transportation Integrated Search
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
Exploring Systems Engineering (and the Universe) Through the RadioJOVE telescope
NASA Astrophysics Data System (ADS)
Aditi Raj, Anya
2017-01-01
Amateur projects in radio astronomy are popular methods to engage in what often seems to be an inaccessible field, and pre-made kits are becoming increasingly available to hobbyists and educators. One such kit is the RadioJOVE, which is attractive due to its simplicity, accessibility and its extensive support network and community of users. When coupled with an education in project management, building the RadioJOVE provides a perfect framework to learn about best practices in completing a project. We will primarily discuss the use of the RadioJOVE project to enhance study in project management and systems engineering. We also intend to discuss the importance of amateur projects such as the RadioJOVE in gaining a holistic understanding of radio astronomy and the project’s potential to spark interest in radio astronomy in students of various disciplines.
Advanced Engineering Environment FY09/10 pilot project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lamph, Jane Ann; Kiba, Grant W.; Pomplun, Alan R.
2010-06-01
The Advanced Engineering Environment (AEE) project identifies emerging engineering environment tools and assesses their value to Sandia National Laboratories and our partners in the Nuclear Security Enterprise (NSE) by testing them in our design environment. This project accomplished several pilot activities, including: the preliminary definition of an engineering bill of materials (BOM) based product structure in the Windchill PDMLink 9.0 application; an evaluation of Mentor Graphics Data Management System (DMS) application for electrical computer-aided design (ECAD) library administration; and implementation and documentation of a Windchill 9.1 application upgrade. The project also supported the migration of legacy data from existing corporatemore » product lifecycle management systems into new classified and unclassified Windchill PDMLink 9.0 systems. The project included two infrastructure modernization efforts: the replacement of two aging AEE development servers for reliable platforms for ongoing AEE project work; and the replacement of four critical application and license servers that support design and engineering work at the Sandia National Laboratories/California site.« less
NASA Astrophysics Data System (ADS)
Sheldon, W.
2013-12-01
Managing data for a large, multidisciplinary research program such as a Long Term Ecological Research (LTER) site is a significant challenge, but also presents unique opportunities for data stewardship. LTER research is conducted within multiple organizational frameworks (i.e. a specific LTER site as well as the broader LTER network), and addresses both specific goals defined in an NSF proposal as well as broader goals of the network; therefore, every LTER data can be linked to rich contextual information to guide interpretation and comparison. The challenge is how to link the data to this wealth of contextual metadata. At the Georgia Coastal Ecosystems LTER we developed an integrated information management system (GCE-IMS) to manage, archive and distribute data, metadata and other research products as well as manage project logistics, administration and governance (figure 1). This system allows us to store all project information in one place, and provide dynamic links through web applications and services to ensure content is always up to date on the web as well as in data set metadata. The database model supports tracking changes over time in personnel roles, projects and governance decisions, allowing these databases to serve as canonical sources of project history. Storing project information in a central database has also allowed us to standardize both the formatting and content of critical project information, including personnel names, roles, keywords, place names, attribute names, units, and instrumentation, providing consistency and improving data and metadata comparability. Lookup services for these standard terms also simplify data entry in web and database interfaces. We have also coupled the GCE-IMS to our MATLAB- and Python-based data processing tools (i.e. through database connections) to automate metadata generation and packaging of tabular and GIS data products for distribution. Data processing history is automatically tracked throughout the data lifecycle, from initial import through quality control, revision and integration by our data processing system (GCE Data Toolbox for MATLAB), and included in metadata for versioned data products. This high level of automation and system integration has proven very effective in managing the chaos and scalability of our information management program.
Using Decision Structures for Policy Analysis in Software Product-line Evolution - A Case Study
NASA Astrophysics Data System (ADS)
Sarang, Nita; Sanglikar, Mukund A.
Project management decisions are the primary basis for project success (or failure). Mostly, such decisions are based on an intuitive understanding of the underlying software engineering and management process and have a likelihood of being misjudged. Our problem domain is product-line evolution. We model the dynamics of the process by incorporating feedback loops appropriate to two decision structures: staffing policy, and the forces of growth associated with long-term software evolution. The model is executable and supports project managers to assess the long-term effects of possible actions. Our work also corroborates results from earlier studies of E-type systems, in particular the FEAST project and the rules for software evolution, planning and management.
Software Project Management and Measurement on the World-Wide-Web (WWW)
NASA Technical Reports Server (NTRS)
Callahan, John; Ramakrishnan, Sudhaka
1996-01-01
We briefly describe a system for forms-based, work-flow management that helps members of a software development team overcome geographical barriers to collaboration. Our system, called the Web Integrated Software Environment (WISE), is implemented as a World-Wide-Web service that allows for management and measurement of software development projects based on dynamic analysis of change activity in the workflow. WISE tracks issues in a software development process, provides informal communication between the users with different roles, supports to-do lists, and helps in software process improvement. WISE minimizes the time devoted to metrics collection and analysis by providing implicit delivery of messages between users based on the content of project documents. The use of a database in WISE is hidden from the users who view WISE as maintaining a personal 'to-do list' of tasks related to the many projects on which they may play different roles.
The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training
NASA Technical Reports Server (NTRS)
Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.;
2017-01-01
The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.
Let your fingers do the walking: The projects most invaluable tool
NASA Technical Reports Server (NTRS)
Zirk, Deborah A.
1993-01-01
The barrage of information pertaining to the software being developed for a project can be overwhelming. Current status information, as well as the statistics and history of software releases, should be 'at the fingertips' of project management and key technical personnel. This paper discusses the development, configuration, capabilities, and operation of a relational database, the System Engineering Database (SEDB) which was designed to assist management in monitoring of the tasks performed by the Network Control Center (NCC) Project. This database has proven to be an invaluable project tool and is utilized daily to support all project personnel.
Exploration Medical System Demonstration Project
NASA Technical Reports Server (NTRS)
Chin, D. A.; McGrath, T. L.; Reyna, B.; Watkins, S. D.
2011-01-01
A near-Earth Asteroid (NEA) mission will present significant new challenges including hazards to crew health created by exploring a beyond low earth orbit destination, traversing the terrain of asteroid surfaces, and the effects of variable gravity environments. Limited communications with ground-based personnel for diagnosis and consultation of medical events require increased crew autonomy when diagnosing conditions, creating treatment plans, and executing procedures. Scope: The Exploration Medical System Demonstration (EMSD) project will be a test bed on the International Space Station (ISS) to show an end-to-end medical system assisting the Crew Medical Officers (CMO) in optimizing medical care delivery and medical data management during a mission. NEA medical care challenges include resource and resupply constraints limiting the extent to which medical conditions can be treated, inability to evacuate to Earth during many mission phases, and rendering of medical care by a non-clinician. The system demonstrates the integration of medical technologies and medical informatics tools for managing evidence and decision making. Project Objectives: The objectives of the EMSD project are to: a) Reduce and possibly eliminate the time required for a crewmember and ground personnel to manage medical data from one application to another. b) Demonstrate crewmember's ability to access medical data/information via a software solution to assist/aid in the treatment of a medical condition. c) Develop a common data management architecture that can be ubiquitously used to automate repetitive data collection, management, and communications tasks for all crew health and life sciences activities. d) Develop a common data management architecture that allows for scalability, extensibility, and interoperability of data sources and data users. e) Lower total cost of ownership for development and sustainment of peripheral hardware and software that use EMSD for data management f) Provide better crew health via the reduction in crew errors, crew time, and ground time.
DOT National Transportation Integrated Search
1995-12-01
CONTINUED FROM DOCUMENT NUMBER 6303 : RESEARCH AND DEVELOPMENT OR R&D, ELECTRONIC PAYMENT SYSTEMS, AUTOMATED FARE COLLECTION, EMERGENCY MANAGEMENT SERVICES OR EMS, FREEWAY MANAGEMENT SYSTEMS, INCIDENT MANAGEMENT/INCIDENT DETECTION : THE L-95 CORRI...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... State priority system and list must be designed to achieve optimum water quality management consistent... water quality management (WQM) plans. The State shall hold a public hearing before submission of the... also sets forth the administrative, management, and public participation procedures required to develop...
Staley, S; Romlein, J; Chacko, A K; Wider, R
2000-05-01
Picture archiving and communication system (PACS) maintenance on an individual site basis has historically been a complex and costly challenge. With the advent of enterprise-wide PACS projects such as the Virtual Radiology Environment (VRE) project, the challenge of a maintenance program with even more complexities has presented itself. The approach of the project management team for the VRE project is not one of reactive maintenance, but one of highly proactive planning and negotiations, in hopes of capitalizing on the economies of scale of an enterprise-wide PACS maintenance program. A proactive maintenance program is one aspect of life-cycle management. As with any capital acquisition, life-cycle management may be used to manage the specific project aspects related to PACS. The purpose of an enterprise-wide warranty and maintenance life-cycle management approach is to maintain PACS at its maximum operational efficiency and utilization levels through a flexible, shared, yet symbiotic relationship between local, regional, and vendor resources. These goals include providing maximum operational performance levels on a local, regional, and enterprise basis, while maintaining acceptable costs and resource utilization levels. This goal must be achieved without negatively impacting point of care activities, regardless of changes to the clinical business environment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None,
1981-09-01
Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)
Applied Space Systems Engineering. Chapter 17; Manage Technical Data
NASA Technical Reports Server (NTRS)
Kent, Peter
2008-01-01
Effective space systems engineering (SSE) is conducted in a fully electronic manner. Competitive hardware, software, and system designs are created in a totally digital environment that enables rapid product design and manufacturing cycles, as well as a multitude of techniques such as modeling, simulation, and lean manufacturing that significantly reduce the lifecycle cost of systems. Because the SSE lifecycle depends on the digital environment, managing the enormous volumes of technical data needed to describe, build, deploy, and operate systems is a critical factor in the success of a project. This chapter presents the key aspects of Technical Data Management (TDM) within the SSE process. It is written from the perspective of the System Engineer tasked with establishing the TDM process and infrastructure for a major project. Additional perspectives are reflected from the point of view of the engineers on the project who work within the digital engineering environment established by the TDM toolset and infrastructure, and from the point of view of the contactors who interface via the TDM infrastructure. Table 17.1 lists the TDM process as it relates to SSE.
Training survey -- educational profile for Hanford HANDI 2000 project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
Fluor Daniel Hanford, Inc. (FDH) is currently adopting streamlined business processes through integrated software solutions. Replacing the legacy software (current/replacement systems, attached) also avoids significant maintenance required to resolve Year 2000 issues. This initiative is being referred to as `HANDI 2000`. The software being implemented in the first phase of this project includes Indus International`s PASSPORT Software, Peoplesoft and Primavera P3 Software. The project, which encompasses all the system replacements that will occur, has been named `HANDI 2000.` The PASSPORT applications being implemented are Inventory Management, Purchasing, Contract Management, Accounts Payable, and MSDS (Material Safety Data Sheets).
Makinde, Olusesan A; Ezomike, Chioma F; Lehmann, Harold P; Ibanga, Iko J
2011-11-28
To share our experience on how we used simple but detailed processes and deployed a management information system on a new HIV counseling and testing (HCT) project in Nigeria. The procedures used in this study were adopted for their strength in identifying areas of continuous improvement as the project was implemented. We used an iterative brainstorming technique among 30 participants (volunteer counselors and project management staff) as well as iterative quality audits to identify several limitations to the success of the project and to propose solutions. We then implemented the solutions and reevaluated for performance. Findings from the evaluations were then reintroduced into the brainstorming and planning sessions. Several limitations were identified with the most prominent being the poor documentation of records at the site and the lack of a document transfer trail for audit purposes. Communication, cohesion and team focus are necessary to achieve success on any new project. Institutionalizing routine HIV behavioral surveillance using data collected at HCT will help in streamlining interventions that will be evidence-based. 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins
Developing Instructional Technology Products Using Effective Project Management Practices
ERIC Educational Resources Information Center
Allen, Stephanie; Hardin, Paul C.
2008-01-01
Delivering a successful instructional technology (IT) product depends on more than just having an extremely creative instructional solution or following an instructional systems design (ISD) model. Proper planning, direction, and execution of the project are require, as well. We present a model of management that encompasses the ISD process. Five…
Space Geodesy Project Information and Configuration Management Procedure
NASA Technical Reports Server (NTRS)
Merkowitz, Stephen M.
2016-01-01
This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-24
... of proposal to design and implement a personnel management demonstration project. SUMMARY: Section..., 2009, designates additional DoD laboratories as STRLs for the purpose of designing and implementing... experiences, SSC Atlantic and SSC Pacific have the benefit of being in earlier personnel systems designed to...
Daniel Navon
1978-01-01
These 14 papers were submitted to a conference of Project Group P4.07 Division IV, International Union of Forestry Research Organizations. Topics discussed included the uses of simulations, analytical techniques, and mathematical programming techniques in land management planning, reforestation programs, intensive forestry, timber management and production, tree growth...
Non-Algorithmic Issues in Automated Computational Mechanics
1991-04-30
Tworzydlo, Senior Research Engineer and Manager of Advanced Projects Group I. Professor I J. T. Oden, President and Senior Scientist of COMCO, was project...practical applications of the systems reported so far is due to the extremely arduous and complex development and management of a realistic knowledge base...software, designed to effectively implement deep, algorithmic knowledge, * and 0 "intelligent" software, designed to manage shallow, heuristic
2013-06-30
QUANTITATIVE RISK ANALYSIS The use of quantitative cost risk analysis tools can be valuable in measuring numerical risk to the government ( Galway , 2004...assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost, schedule, and...www.amazon.com Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review (RAND Working Paper WR-112-RC
Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)
NASA Technical Reports Server (NTRS)
Vipavetz, Kevin; Shull, Thomas A.; Infeld, Samatha; Price, Jim
2016-01-01
The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.
Galileo: Exploration of Jupiter's system
NASA Technical Reports Server (NTRS)
Johnson, T. V.; Yeates, C. M.; Colin, L.; Fanale, F. P.; Frank, L.; Hunten, D. M.
1985-01-01
The scientific objectives of the Galileo mission to the Jovian system is presented. Topics discussed include the history of the project, our current knowledge of the system, the objectives of interrelated experiments, mission design, spacecraft, and instruments. The management, scientists, and major contractors for the project are also given.
Automated Procurement System (APS) revised project management plan (DS-03)
NASA Technical Reports Server (NTRS)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
DOT National Transportation Integrated Search
2011-08-01
This report documents an investigation into the transportation project development process in the : context of the implementation of bus rapid transit systems on the State Highway System as well as such : systems being part of the Federal New Starts ...
Adaptive Management for Urban Watersheds: The Slavic Village Pilot Project
Adaptive management is an environmental management strategy that uses an iterative process of decision-making to reduce the uncertainty in environmental management via system monitoring. A central tenet of adaptive management is that management involves a learning process that ca...
The Research of Paper Datum Mmanagement Information System
NASA Astrophysics Data System (ADS)
Zhigang, Ji; Gaifang, Niu; Lingxi, Liu
Now, paper management is becoming an important work in many colleges and universities, and the digitization of paper management is a significant constituent part of the information of college management. We have studied a universal framework of comprehensive management system spanning departments and geographical positions by taking the opportunity of the developing of the paper management system. The framework provides support for setting up large complicated distributed application fleetly, efficiently, expansively and safely, and it is a new project to realize the standardization of paper information management.
PACS project management utilizing web-based tools
NASA Astrophysics Data System (ADS)
Patel, Sunil; Levin, Brad; Gac, Robert J., Jr.; Harding, Douglas, Jr.; Chacko, Anna K.; Radvany, Martin; Romlein, John R.
2000-05-01
As Picture Archiving and Communications Systems (PACS) implementations become more widespread, the management of deploying large, multi-facility PACS will become a more frequent occurrence. The tools and usability of the World Wide Web to disseminate project management information obviates time, distance, participant availability, and data format constraints, allowing for the effective collection and dissemination of PACS planning, implementation information, for a potentially limitless number of concurrent PACS sites. This paper will speak to tools, such as (1) a topic specific discussion board, (2) a 'restricted' Intranet, within a 'project' Intranet. We will also discuss project specific methods currently in use in a leading edge, regional PACS implementation concerning the sharing of project schedules, physical drawings, images of implementations, site-specific data, point of contacts lists, project milestones, and a general project overview. The individual benefits realized for the end user from each tool will also be covered. These details will be presented, balanced with a spotlight on communication as a critical component of any project management undertaking. Using today's technology, the web arguably provides the most cost and resource effective vehicle to facilitate the broad based, interactive sharing of project information.
New York integrated incident management system evaluation project final report
DOT National Transportation Integrated Search
2007-03-23
The Integrated Incident Management System (IIMS) enables incident response personnel to transmit data about an incident to other responders and dispatchers on a real-time basis. When an incident is entered into IIMS, the system uses GPS to identify t...
Decision support systems for transportation system management and operations (TSM&O).
DOT National Transportation Integrated Search
2015-12-01
There is a need for the development of tools and methods to support off-line and real-time : planning and operation decisions associated with the Transportation System Management and : Operations (TSM&O) program. The goal of this proposed project is ...
SDDOT transportation systems management & operations program plan.
DOT National Transportation Integrated Search
2016-06-01
The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...
[Evaluation of public health risk. A new instrument for environmental management in Chile].
Matus C, Patricia
2011-08-01
One of the main challenges in environmental management is to prevent the public health impact of projects that can cause pollution. To tackle this problem, the new Chilean bill on environmental management has defined the need to determine the potential health risks of a given Project. This paper gives a summary of the method used for risk evaluation and its evolution. Its incorporation in the Environmental Impact Evaluation System is proposed, to guarantee an effective prevention of the potential risks on health of new projects.
NASA System Engineering Design Process
NASA Technical Reports Server (NTRS)
Roman, Jose
2011-01-01
This slide presentation reviews NASA's use of systems engineering for the complete life cycle of a project. Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. Each phase of a NASA project is terminated with a Key decision point (KDP), which is supported by major reviews.
ENVIRONMENTAL QUALITY INFORMATION SYSTEM - EQULS® - ITER
This project consisted of an evaluation of the Environmental Quality Information System (EQuIS) software designed by Earthsoft, Inc. as an environmental data management and analysis platform for monitoring and remediation projects. In consultation with the EQuIS vendor, six pri...
Status of DOE and AID stand-alone photovoltaic system field tests
NASA Astrophysics Data System (ADS)
Bifano, W. J.; Delombard, R.; Ratajczak, A. F.; Scudder, L. R.
The NASA Lewis Research Center (LeRC) is managing stand-alone photovoltaic (PV) system projects sponsored by the U.S. Department of Energy (DOE) and the U.S. Agency for International Development (AID). The DOE project includes village PV power demonstration projects in Gabon (four sites) and the Marshall Islands, and PV-powered vaccine refrigerator systems in six countries. The AID project includes a large village power system, a farmhouse system and two water pumping-irrigation systems in Tunisia, a water pumping/grain grinding system in Upper Volta, five medical clinic systems in four countries, PV-powered vaccine refrigerator systems in 18 countries and a PV-powered remote earth station in Indonesia. This paper reviews these PV projects and summarizes significant findings to date.
Status of DOE and AID stand-alone photovoltaic system field tests
NASA Technical Reports Server (NTRS)
Bifano, W. J.; Delombard, R.; Ratajczak, A. F.; Scudder, L. R.
1984-01-01
The NASA Lewis Research Center (LeRC) is managing stand-alone photovoltaic (PV) system projects sponsored by the U.S. Department of Energy (DOE) and the U.S. Agency for International Development (AID). The DOE project includes village PV power demonstration projects in Gabon (four sites) and the Marshall Islands, and PV-powered vaccine refrigerator systems in six countries. The AID project includes a large village power system, a farmhouse system and two water pumping-irrigation systems in Tunisia, a water pumping/grain grinding system in Upper Volta, five medical clinic systems in four countries, PV-powered vaccine refrigerator systems in 18 countries and a PV-powered remote earth station in Indonesia. This paper reviews these PV projects and summarizes significant findings to date.
The Troll HSE Risk Management System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiig, E.; Berthelsen, I.; Donovan, K.
1996-12-31
The Petroleum Act and Internal Control regulations in Norway lay down requirements for how HSE shall be Managed and documented. To comply with the Norwegian legislation the Troll Project has developed an HSE Risk Management System (RMS) structured around Hazards and Effects Management. The resulting quality, technical and operating integrity, and HSE performance are an endorsement of the power of RMS.
NASA Astrophysics Data System (ADS)
Schneller, D.
2014-08-01
The E-ELT has completed its design phase and is now entering construction. ESO is acting as prime contractor and usually procures subsystems, including their design, from industry. This, in turn, leads to a large number of requirements, whose validity, consistency and conformity with user needs requires extensive management. Therefore E-ELT Systems Engineering has chosen to follow a systematic approach, based on a reasoned requirement architecture that follows the product breakdown structure of the observatory. The challenge ahead is the controlled flow-down of science user needs into engineering requirements, requirement specifications and system design documents. This paper shows how the E-ELT project manages this. The project has adopted IBM DOORTM as a supporting requirements management tool. This paper deals with emerging problems and pictures potential solutions. It shows trade-offs made to reach a proper balance between the effort put in this activity and potential overheads, and the benefit for the project.
Management of Service Projects in Support of Space Flight Research
NASA Technical Reports Server (NTRS)
Love, J.
2009-01-01
Goal:To provide human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration . [HRP-47051] Specific Objectives: 1) Develop capabilities, necessary countermeasures, and technologies in support of human space exploration, focusing on mitigating the highest risks to human health and performance. 2) Define and improve human spaceflight medical, environmental, and human factors standards. 3) Develop technologies that serve to reduce medical and environmental risks, to reduce human systems resource requirements (mass, volume, power, data, etc.) and to ensure effective human-system integration across exploration systems. 4) Ensure maintenance of Agency core competencies necessary to enable risk reduction in the following areas: A. Space medicine B. Physiological and behavioral effects of long duration spaceflight on the human body C. Space environmental effects, including radiation, on human health and performance D. Space "human factors" [HRP-47051]. Service projects can form integral parts of research-based project-focused programs to provide specialized functions. Traditional/classic project management methodologies and agile approaches are not mutually exclusive paradigms. Agile strategies can be combined with traditional methods and applied in the management of service projects functioning in changing environments. Creative collaborations afford a mechanism for mitigation of constrained resource limitations.
ERIC Educational Resources Information Center
Coopers & Lybrand, New York, NY.
Covered in this report of the 1978 project of the Joint Committee on Printing are aspects of three selected areas. Part one, Management Review and Assessment, contains a summary of management and user interviews, a review of GPO's goals and organizational structure, and an assessment of management systems and procedures. The accounting system is…
Open Ocean Assessments for Management in the GEF Transboundary Waters Assessment Project (TWAP)
NASA Astrophysics Data System (ADS)
Fischer, A. S.; Alverson, K. D.
2010-12-01
A methodology for a thematic and scientifically-credible assessment of Open Ocean waters as a part of the Global Environment Facility (GEF) Transboundary Waters Assessment Project (TWAP) has been developed in the last 18 months by the Intergovernmental Oceanographic Commission of UNESCO, and is presented for feedback and comment. While developed to help the GEF International Waters focal area target investment to manage looming environmental threats in interlinked freshwater and marine systems (a very focused decision support system), the assessment methodology could contribute to other assessment and management efforts in the UN system and elsewhere. Building on a conceptual framework that describes the relationships between human systems and open ocean natural systems, and on mapping of the human impact on the marine environment, the assessment will evaluate and make projections on a thematic basis, identifying key metrics, indices, and indicators. These themes will include the threats on key ecosystem services of climate change through sea level rise, changed stratification, warming, and ocean acidification; vulnerabilities of ecosystems, habitats, and living marine resources; the impact and sustainability of fisheries; and pollution. Global-level governance arrangements will also be evaluated, with an eye to identifying scope for improved global-level management. The assessment will build on sustained ocean observing systems, model projections, and an assessment of scientific literature, as well as tools for combining knowledge to support identification of priority concerns and in developing scenarios for management. It will include an assessment of key research and observing needs as one way to deal with the scientific uncertainty inherent in such an exercise, and to better link policy and science agendas.
Furniss, Dominic; Curzon, Paul; Blandford, Ann
2018-06-01
Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.
Project management web tools at the MICE experiment
NASA Astrophysics Data System (ADS)
Coney, L. R.; Tunnell, C. D.
2012-12-01
Project management tools like Trac are commonly used within the open-source community to coordinate projects. The Muon Ionization Cooling Experiment (MICE) uses the project management web application Redmine to host mice.rl.ac.uk. Many groups within the experiment have a Redmine project: analysis, computing and software (including offline, online, controls and monitoring, and database subgroups), executive board, and operations. All of these groups use the website to communicate, track effort, develop schedules, and maintain documentation. The issue tracker is a rich tool that is used to identify tasks and monitor progress within groups on timescales ranging from immediate and unexpected problems to milestones that cover the life of the experiment. It allows the prioritization of tasks according to time-sensitivity, while providing a searchable record of work that has been done. This record of work can be used to measure both individual and overall group activity, identify areas lacking sufficient personnel or effort, and as a measure of progress against the schedule. Given that MICE, like many particle physics experiments, is an international community, such a system is required to allow easy communication within a global collaboration. Unlike systems that are purely wiki-based, the structure of a project management tool like Redmine allows information to be maintained in a more structured and logical fashion.
Student Organizations--FBLA Projects and Activities Relating to Free Enterprise.
ERIC Educational Resources Information Center
Western Kentucky Univ., Bowling Green.
This guide for Future Business Leaders of America and Phi Beta Lambda chapters describes 25 economic awareness projects/activities to create awareness of the free enterprise economic system. Introductory materials include suggestions for project planning and management and a worksheet for planning activities and projects. The projects/activities…
Evaluation of Oregon Department of Transportation project delivery.
DOT National Transportation Integrated Search
2007-08-01
This report summarizes analysis of Oregon Department of Transportation (ODOT) methods of insourced and outsourced project delivery using data obtained from ODOT reporting systems, ratings of project effectiveness by ODOT Area Managers and by construc...
A Systems-Based Approach To Integrated Nutrient Management in Narragansett Bay and Its Watershed.
EPA’s Office of Research and Development is embarking on a project to develop and demonstrate a systems-based management approach that will achieve more integrated and effective management of nutrients in southern New England. The geographic focus of this multi-year research proj...
A Systems-Based Approach to Integrated Nutrient Management in Narragansett Bay and its Watershed
EPA’s Office of Research and Development is embarking on a project to develop and demonstrate a systems-based management approach that will achieve more integrated and effective management of nutrients in southern New England. The geographic focus of this multi-year research proj...
Appendix X. ComField Information Management System.
ERIC Educational Resources Information Center
Coffin, Robert W.
This appendix outlines the ComField information management system which is designed to give the project management a comprehensive tool for decisionmaking and to free instructors from tasks of keeping current records of every student's performance, help them plan their time more efficiently for counseling students and planning instruction, and…
Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review
NASA Technical Reports Server (NTRS)
Taylor, Randall
2011-01-01
The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.
Gulf of Mexico Integrated Science - Tampa Bay Study - Data Information Management System (DIMS)
Johnston, James
2004-01-01
The Tampa Bay Integrated Science Study is an effort by the U.S. Geological Survey (USGS) that combines the expertise of federal, state and local partners to address some of the most pressing ecological problems of the Tampa Bay estuary. This project serves as a template for the application of integrated research projects in other estuaries in the Gulf of Mexico. Efficient information and data distribution for the Tampa Bay Study has required the development of a Data Information Management System (DIMS). This information system is being used as an outreach management tool, providing information to scientists, decision makers and the public on the coastal resources of the Gulf of Mexico.
Envision: An interactive system for the management and visualization of large geophysical data sets
NASA Technical Reports Server (NTRS)
Searight, K. R.; Wojtowicz, D. P.; Walsh, J. E.; Pathi, S.; Bowman, K. P.; Wilhelmson, R. B.
1995-01-01
Envision is a software project at the University of Illinois and Texas A&M, funded by NASA's Applied Information Systems Research Project. It provides researchers in the geophysical sciences convenient ways to manage, browse, and visualize large observed or model data sets. Envision integrates data management, analysis, and visualization of geophysical data in an interactive environment. It employs commonly used standards in data formats, operating systems, networking, and graphics. It also attempts, wherever possible, to integrate with existing scientific visualization and analysis software. Envision has an easy-to-use graphical interface, distributed process components, and an extensible design. It is a public domain package, freely available to the scientific community.
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
SAGA: A project to automate the management of software production systems
NASA Technical Reports Server (NTRS)
Campbell, R. H.
1983-01-01
The current work in progress for the SAGA project are described. The highlights of this research are: a parser independent SAGA editor, design for the screen editing facilities of the editor, delivery to NASA of release 1 of Olorin, the SAGA parser generator, personal workstation environment research, release 1 of the SAGA symbol table manager, delta generation in SAGA, requirements for a proof management system, documentation for and testing of the cyber pascal make prototype, a prototype cyber-based slicing facility, a June 1984 demonstration plan, SAGA utility programs, summary of UNIX software engineering support, and theorem prover review.
Apollo Soyuz Test Project Weights and Mass Properties Operational Management System
NASA Technical Reports Server (NTRS)
Collins, M. A., Jr.; Hischke, E. R.
1975-01-01
The Apollo Soyuz Test Project (ASTP) Weights and Mass Properties Operational Management System was established to assure a timely and authoritative method of acquiring, controlling, generating, and disseminating an official set of vehicle weights and mass properties data. This paper provides an overview of the system and its interaction with the various aspects of vehicle and component design, mission planning, hardware and software simulations and verification, and real-time mission support activities. The effect of vehicle configuration, design maturity, and consumables updates is discussed in the context of weight control.
Knowledge Management Orientation: An Innovative Perspective to Hospital Management
GHASEMI, Matina; GHADIRI NEJAD, Mazyar; BAGZIBAGLI, Kemal
2017-01-01
Background: By considering innovation as a new project in hospitals, all the project management’s standard steps should be followed in execution. This study investigated the validation of a new set of measures in terms of providing a procedure for knowledge management-oriented innovation that enriches the hospital management system. Methods: The relation between innovation and all the knowledge management areas, as the main constructs of project management, was illustrated by referring to project management standard steps and previous studies. Through consultations and meetings with a committee of professional project managers, a questionnaire was developed to measure ten knowledge management areas in hospital’s innovation process. Additionally, a group of experts from hospital managers were invited to comment on the applicability of the questionnaires by considering if the items are measurable in hospitals practically. Results: A close-ended, Likert-type scale items, consisted of ten sections, were developed based on project management body of knowledge thorough Delphi technique. It enables the managers to evaluate hospitals’ situation to be aware whether the organization follows the knowledge management standards in innovation process or not. By pilot study, confirmatory factor analysis and exploratory factor analysis were conducted to ensure the validity and reliability of the measurement items. Conclusion: The developed items seem to have a potential to help hospital managers and subsequently delivering new products/services successfully based on the standard procedures in their organization. In all innovation processes, the knowledge management areas and their standard steps help hospital managers by a new tool as questionnaire format. PMID:29259938
NASA Astrophysics Data System (ADS)
Vasiliades, Lampros; Spiliotopoulos, Marios; Tzabiras, John; Loukas, Athanasios; Mylopoulos, Nikitas
2015-06-01
An integrated modeling system, developed in the framework of "Hydromentor" research project, is applied to evaluate crop water requirements for operational water resources management at Lake Karla watershed, Greece. The framework includes coupled components for operation of hydrotechnical projects (reservoir operation and irrigation works) and estimation of agricultural water demands at several spatial scales using remote sensing. The study area was sub-divided into irrigation zones based on land use maps derived from Landsat 5 TM images for the year 2007. Satellite-based energy balance for mapping evapotranspiration with internalized calibration (METRIC) was used to derive actual evapotranspiration (ET) and crop coefficient (ETrF) values from Landsat TM imagery. Agricultural water needs were estimated using the FAO method for each zone and each control node of the system for a number of water resources management strategies. Two operational strategies of hydro-technical project development (present situation without operation of the reservoir and future situation with the operation of the reservoir) are coupled with three water demand strategies. In total, eight (8) water management strategies are evaluated and compared. The results show that, under the existing operational water resources management strategies, the crop water requirements are quite large. However, the operation of the proposed hydro-technical projects in Lake Karla watershed coupled with water demand management measures, like improvement of existing water distribution systems, change of irrigation methods, and changes of crop cultivation could alleviate the problem and lead to sustainable and ecological use of water resources in the study area.
DOT National Transportation Integrated Search
1998-01-01
VDOT is implementing Pontis 3.0 to provide the analytical component of its Bridge Management System (BMS). This system prioritizes bridge maintenance, repair, rehabilitation, and replacement (MRR & R) needs using cost/benefit analysis. The accuracy o...
DOE Office of Scientific and Technical Information (OSTI.GOV)
RIECK, C.A.
1999-02-23
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less
Using Group Drawings Activities to Facilitate the Understanding of the Systemic Aspects of Projects
ERIC Educational Resources Information Center
Arantes do Amaral, João Alberto; Hess, Aurélio; Gonçalves, Paulo; Rodrigues, Vinícius Picanço
2017-01-01
In this article, we present our findings regarding promoting group drawing activities in order to facilitate the learning of systemic aspects of projects. We discuss the approach we used to engage the students and foster learning in our classes. We used group drawing activities in two project management undergraduate courses. The courses, which…
Laboratory Animal Management Assistant (LAMA): a LIMS for active research colonies.
Milisavljevic, Marko; Hearty, Taryn; Wong, Tony Y T; Portales-Casamar, Elodie; Simpson, Elizabeth M; Wasserman, Wyeth W
2010-06-01
Laboratory Animal Management Assistant (LAMA) is an internet-based system for tracking large laboratory mouse colonies. It has a user-friendly interface with powerful search capabilities that ease day-to-day tasks such as tracking breeding cages and weaning litters. LAMA was originally developed to manage hundreds of new mouse strains generated by a large functional genomics program, the Pleiades Promoter Project ( http://www.pleiades.org ). The software system has proven to be highly flexible, suitable for diverse management approaches to mouse colonies. It allows custom tagging and grouping of animals, simplifying project-specific handling and access to data. Finally, LAMA was developed in close collaboration with mouse technicians to ease the transition from paper- or Excel-based management systems to computerized tracking, allowing data export in a popular spreadsheet format and automatic printing of cage cards. LAMA is an open-access software tool, freely available to the research community at http://launchpad.net/mousedb .
Luo, Jake; Apperson-Hansen, Carolyn; Pelfrey, Clara M; Zhang, Guo-Qiang
2014-11-30
Cross-institutional cross-disciplinary collaboration has become a trend as researchers move toward building more productive and innovative teams for scientific research. Research collaboration is significantly changing the organizational structure and strategies used in the clinical and translational science domain. However, due to the obstacles of diverse administrative structures, differences in area of expertise, and communication barriers, establishing and managing a cross-institutional research project is still a challenging task. We address these challenges by creating an integrated informatics platform to reduce the barriers to biomedical research collaboration. The Request Management System (RMS) is an informatics infrastructure designed to transform a patchwork of expertise and resources into an integrated support network. The RMS facilitates investigators' initiation of new collaborative projects and supports the management of the collaboration process. In RMS, experts and their knowledge areas are categorized and managed structurally to provide consistent service. A role-based collaborative workflow is tightly integrated with domain experts and services to streamline and monitor the life-cycle of a research project. The RMS has so far tracked over 1,500 investigators with over 4,800 tasks. The research network based on the data collected in RMS illustrated that the investigators' collaborative projects increased close to 3 times from 2009 to 2012. Our experience with RMS indicates that the platform reduces barriers for cross-institutional collaboration of biomedical research projects. Building a new generation of infrastructure to enhance cross-disciplinary and multi-institutional collaboration has become an important yet challenging task. In this paper, we share the experience of developing and utilizing a collaborative project management system. The results of this study demonstrate that a web-based integrated informatics platform can facilitate and increase research interactions among investigators.
Pérez-Pérez, Martín; Glez-Peña, Daniel; Fdez-Riverola, Florentino; Lourenço, Anália
2015-02-01
Document annotation is a key task in the development of Text Mining methods and applications. High quality annotated corpora are invaluable, but their preparation requires a considerable amount of resources and time. Although the existing annotation tools offer good user interaction interfaces to domain experts, project management and quality control abilities are still limited. Therefore, the current work introduces Marky, a new Web-based document annotation tool equipped to manage multi-user and iterative projects, and to evaluate annotation quality throughout the project life cycle. At the core, Marky is a Web application based on the open source CakePHP framework. User interface relies on HTML5 and CSS3 technologies. Rangy library assists in browser-independent implementation of common DOM range and selection tasks, and Ajax and JQuery technologies are used to enhance user-system interaction. Marky grants solid management of inter- and intra-annotator work. Most notably, its annotation tracking system supports systematic and on-demand agreement analysis and annotation amendment. Each annotator may work over documents as usual, but all the annotations made are saved by the tracking system and may be further compared. So, the project administrator is able to evaluate annotation consistency among annotators and across rounds of annotation, while annotators are able to reject or amend subsets of annotations made in previous rounds. As a side effect, the tracking system minimises resource and time consumption. Marky is a novel environment for managing multi-user and iterative document annotation projects. Compared to other tools, Marky offers a similar visually intuitive annotation experience while providing unique means to minimise annotation effort and enforce annotation quality, and therefore corpus consistency. Marky is freely available for non-commercial use at http://sing.ei.uvigo.es/marky. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
Bridge deterioration models to support Indiana's bridge management system.
DOT National Transportation Integrated Search
2016-02-01
An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...
Framework for a comprehensive bridge management and information system.
DOT National Transportation Integrated Search
2011-11-01
"The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...
Geotechnical data management at the Virginia Department of Transportation.
DOT National Transportation Integrated Search
2010-04-01
This report describes the development and implementation of the geotechnical data management system at the Virginia Department of Transportation (VDOT). The purpose of this project was to develop a practical, comprehensive, enterprise-wide system for...
Petersen, Lone Stub; Bjoernes, Charlotte D; Bertelsen, Pernille
2010-01-01
A well-known challenge in system development is the aspect of user participation. In this paper we shift perspective from how to involve users in system development to how project managers with a clinical background, but without technical system knowledge, can involve system developers in IT projects. Using data from the development of an online patient book (an ICT application for clinical practice), we analyze challenges using the concept of language-games. We conclude that further research and development of participatory and communicative methods to involve system developers in IT projects, based in a clinical context, is needed.
NASA Astrophysics Data System (ADS)
Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun
2008-12-01
In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.
Muşat, Simona Nicoleta; Ioniţa, Diana; Paceonea, Mirela; Chiriac, Nona Delia; Stoicescu, Ileana Paula; Mihălţan, F D
2011-01-01
Identifying and promoting new management techniques for the descentralized pneumology hospitals or wards was one of the most ambitious objectives of the project "Quality in the pneumology medical services through continuous medical education and organizational flexibility", financed by the Human Resourses Development Sectorial Operational Programme 2007-2013 (ID 58451). The "Medium term Strategy on the specific management of the pneumology hospitals or wards after the descentralization of the sanitary system" presented in the article was written by the project's experts and discussed with pneumology managers and local authorities representatives. This Strategy application depends on the colaboration of the pneumology hospitals with professional associations, and local and central authorities.
Management issues in systems engineering
NASA Astrophysics Data System (ADS)
Shishko, Robert; Chamberlain, Robert G.; Aster, Robert; Bilardo, Vincent; Forsberg, Kevin; Mooz, Hal; Polaski, Lou; Wade, Ron
When applied to a system, the doctrine of successive refinement is a divide-and-conquer strategy. Complex systems are sucessively divided into pieces that are less complex, until they are simple enough to be conquered. This decomposition results in several structures for describing the product system and the producing system. These structures play important roles in systems engineering and project management. Many of the remaining sections in this chapter are devoted to describing some of these key structures. Structures that describe the product system include, but are not limited to, the requirements tree, system architecture and certain symbolic information such as system drawings, schematics, and data bases. The structures that describe the producing system include the project's work breakdown, schedules, cost accounts and organization.
NASA systems engineering handbook
NASA Astrophysics Data System (ADS)
Shishko, Robert; Aster, Robert; Chamberlain, Robert G.; McDuffee, Patrick; Pieniazek, Les; Rowell, Tom; Bain, Beth; Cox, Renee I.; Mooz, Harold; Polaski, Lou
1995-06-01
This handbook brings the fundamental concepts and techniques of systems engineering to NASA personnel in a way that recognizes the nature of NASA systems and environment. It is intended to accompany formal NASA training courses on systems engineering and project management when appropriate, and is designed to be a top-level overview. The concepts were drawn from NASA field center handbooks, NMI's/NHB's, the work of the NASA-wide Systems Engineering Working Group and the Systems Engineering Process Improvement Task team, several non-NASA textbooks and guides, and material from independent systems engineering courses taught to NASA personnel. Five core chapters cover systems engineering fundamentals, the NASA Project Cycle, management issues in systems engineering, systems analysis and modeling, and specialty engineering integration. It is not intended as a directive.
Management issues in systems engineering
NASA Technical Reports Server (NTRS)
Shishko, Robert; Chamberlain, Robert G.; Aster, Robert; Bilardo, Vincent; Forsberg, Kevin; Mooz, Hal; Polaski, Lou; Wade, Ron
1993-01-01
When applied to a system, the doctrine of successive refinement is a divide-and-conquer strategy. Complex systems are sucessively divided into pieces that are less complex, until they are simple enough to be conquered. This decomposition results in several structures for describing the product system and the producing system. These structures play important roles in systems engineering and project management. Many of the remaining sections in this chapter are devoted to describing some of these key structures. Structures that describe the product system include, but are not limited to, the requirements tree, system architecture and certain symbolic information such as system drawings, schematics, and data bases. The structures that describe the producing system include the project's work breakdown, schedules, cost accounts and organization.
NASA Technical Reports Server (NTRS)
Simon, Tom
2009-01-01
To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.
NASA Technical Reports Server (NTRS)
Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)
2009-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.
Gregory K. Dillon; Zachary A. Holden; Penny Morgan; Bob Keane
2009-01-01
The Fire Severity Mapping System project is geared toward providing fire managers across the western United States with critical information for dealing with and planning for the ecological effects of wildfire at multiple levels of thematic, spatial, and temporal detail. For this project, we are developing a comprehensive, west-wide map of the landscape potential for...
Electronic construction collaboration system -- final phase : [tech transfer summary].
DOT National Transportation Integrated Search
2014-07-01
Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...
Solving a Health Information Management Problem. An international success story.
Hannan, Terry J
2015-01-01
The management of health care delivery requires the availability of effective 'information management' tools based on e-technologies [eHealth]. In developed economies many of these 'tools' are readily available whereas in Low and Middle Income Countries (LMIC) there is limited access to eHealth technologies and this has been defined as the "digital divide". This paper provides a short introduction to the fundamental understanding of what is meant by information management in health care and how it applies to all social economies. The core of the paper describes the successful implementation of appropriate information management tools in a resource poor environment to manage the HIV/AIDS epidemic and other disease states, in sub-Saharan Africa and how the system has evolved to become the largest open source eHealth project in the world and become the health information infrastructure for several national eHealth economies. The system is known as Open MRS [www.openmrs.org). The continuing successful evolution of the OpenMRS project has permitted its key implementers to define core factors that are the foundations for successful eHealth projects.
Francis, Caitlin F; Feyer, Anne-Marie; Smith, Ben J
2007-11-01
The evaluation of the Sharing Health Care Initiative addressed the translation of different models of chronic disease self-management into health and community service contexts in Australia. Across seven projects, four intervention models were adopted: (1) the Stanford Chronic Disease Self Management course; (2) generic disease management planning, training and support; (3) tailored disease management planning, training and support, and; (4) telephone coaching. Targeted recruitment through support groups and patient lists was most successful for reaching high-needs clients. Projects with well developed organisational structures and health system networks demonstrated more effective implementation. Engagement of GPs in recruitment and client support was limited. Future self-management programs will require flexible delivery methods in the primary health care setting, involving practice nurses or the equivalent. After 12 months there was little evidence of potential sustainability, although structures such as consumer resource centres and client support clubs were established in some locations. Only one project was able to use Medicare chronic disease-related items to integrate self-management support into routine general practice. Participants in all projects showed improvements in self-management practices, but those receiving Model 3, flexible and tailored support, and Model 4, telephone coaching, reported the greatest benefits.
ERIC Educational Resources Information Center
Kaiser, David Brian; Köhler, Thomas; Weith, Thomas
2016-01-01
This article aims to sketch a conceptual design for an information and knowledge management system in sustainability research projects. The suitable frameworks to implement knowledge transfer models constitute social communities, because the mutual exchange and learning processes among all stakeholders promote key sustainable developments through…
Project Success Environment: A Positive Contingency Program for Elementary Teachers Management.
ERIC Educational Resources Information Center
Thompson, Marion; And Others
The third year of the project, funded under Elementary Secondary Education Act Title III, was essentially a replication of Year Two. Second Year results indicated that the success technique had provided inner-city teachers with both an effective classroom management system, and an effective program for the acceleration of academic performance.…