Sample records for managing development projects

  1. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  2. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  3. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  4. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  5. Integrating a Project Management Approach to E-Business Application Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2008-01-01

    Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…

  6. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  7. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  8. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  9. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  10. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into... a prime contractor's or general manager's obligations for a development project; or (c) Entry into a...

  11. Managers Handbook for Software Development

    NASA Technical Reports Server (NTRS)

    Agresti, W.; Mcgarry, F.; Card, D.; Page, J.; Church, V.; Werking, R.

    1984-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

  12. Automated support for experience-based software management

    NASA Technical Reports Server (NTRS)

    Valett, Jon D.

    1992-01-01

    To effectively manage a software development project, the software manager must have access to key information concerning a project's status. This information includes not only data relating to the project of interest, but also, the experience of past development efforts within the environment. This paper describes the concepts and functionality of a software management tool designed to provide this information. This tool, called the Software Management Environment (SME), enables the software manager to compare an ongoing development effort with previous efforts and with models of the 'typical' project within the environment, to predict future project status, to analyze a project's strengths and weaknesses, and to assess the project's quality. In order to provide these functions the tool utilizes a vast corporate memory that includes a data base of software metrics, a set of models and relationships that describe the software development environment, and a set of rules that capture other knowledge and experience of software managers within the environment. Integrating these major concepts into one software management tool, the SME is a model of the type of management tool needed for all software development organizations.

  13. Preparing project managers for faster-better-cheaper robotic planetary missions

    NASA Technical Reports Server (NTRS)

    Gowler, P.; Atkins, K.

    2003-01-01

    The authors have developed and implemented a week-long workshop for Jet Propulsion Laboratory Project Managers, designed around the development phases of the JPL Project Life Cycle. The workshop emphasizes the specific activities and deliverables that pertain to JPL managers of NASA robotic space exploration and instrument development projects.

  14. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  15. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  16. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  17. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  18. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  19. Conceptions of Software Development by Project Managers: A Study of Managing the Outsourced Development of Software Applications for United States Federal Government Agencies

    ERIC Educational Resources Information Center

    Eisen, Daniel

    2013-01-01

    This study explores how project managers, working for private federal IT contractors, experience and understand managing the development of software applications for U.S. federal government agencies. Very little is known about how they manage their projects in this challenging environment. Software development is a complex task and only grows in…

  20. Financial Management: Development and Management of the Army Game Project

    DTIC Science & Technology

    2005-08-24

    Financial Management Department of Defense Office of Inspector General August 24, 2005 Development and Management of the Army Game Project (D-2005...Management of the Army Game Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA 22202-4704 Acronyms AGP Army Game Project FMR

  1. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    NASA Astrophysics Data System (ADS)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  2. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  3. Utilization of Information Provided by the Wisconsin Management System.

    ERIC Educational Resources Information Center

    Rossmiller, Richard A.

    The management system developed by the Wisconsin Center for Cognitive Learning (CCL) is useful to principal investigators of individual projects for proposal development, project management, and project reporting, as well as to the CCL management for program planning, program management, and reporting to funding agencies. The system aids proposal…

  4. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  5. Manager's handbook for software development, revision 1

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

  6. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  7. The PMDP Roadmap

    NASA Technical Reports Server (NTRS)

    2004-01-01

    NASA's complex and highly technical missions rely on effective project teams and managers. Since 1993, through its Project Management Development Process (PMDP), the Academy of Program and Project Leadership (APPL) has offered direction to the Agency's project practitioners as they advance in their careers. PMDP helps identify and sequence professional experiences, courses, and other project-based learning experiences that support individual career goals and center activities by outlining competencies at four levels of development. The result is that PMDP provides NASA project practitioners with a road map to the knowledge and competencies appropriate for their job and the jobs to which they aspire. Plus, new this year, APPL has rolled out its electronic Project Management Development Process (ePMDP) tool, a learning management system that includes a dynamic presentation of the PMDP levels, competency areas, competency organizational structures, Individual Development Plans (IDP), and online PMDP enrollment. APPL's website, www.appl.nasa.gov, provides access to ePMDP as well as other online resources for NASA practitioners enrolled in the Project Management Development Process.

  8. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  9. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  13. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  14. Prototype road weather performance management tool : project report : draft report.

    DOT National Transportation Integrated Search

    2016-09-30

    This report is the Project Report for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Uses Connected Vehicle Data (RW-...

  15. Center for Ground Vehicle Development and Integration

    DTIC Science & Technology

    2011-04-22

    UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations

  16. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    ERIC Educational Resources Information Center

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  17. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  18. Development of high-rise buildings: digitalization of life cycle management

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  19. Utilising Planning and Financing Strategies in the Management of Community Development Projects in Enugu State, Nigeria

    ERIC Educational Resources Information Center

    Obetta, Chukwuemeka K.; Oreh, Catherine I.

    2017-01-01

    Utilisation of community management strategies is an approach to governance that is based on community and organisational involvement. Communities with development projects have formed community projects management committees (CPMCs) that are encouraged to adopt the community management strategy in the planning and financing of community…

  20. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  1. ASK Magazine. Volume 10

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward (Editor); Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    The Academy of Program and Project Leadership (APPL) and ASK Magazine is presented. APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of our Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects-they're all here in ASK. APPL is one of our most exciting publications about project management.

  2. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  3. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  4. Should Project Managers Buy Technical Data

    DTIC Science & Technology

    2017-04-06

    Should Project Managers Buy Technical Data? Jerry Harper April 6, 2017 PUBLISHED BY The Defense...intellectual property (IP) management and technical data rights (TDR) strategies. According to DoD Instruction 5000.02 (DoD, 2017), project managers (PMs...Defense Authorization Act NDI ................nondevelopmental item PM ................. project manager R&D ...............research and development

  5. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  6. Impact of senior design project for the development of leadership and management skills in construction management

    NASA Astrophysics Data System (ADS)

    Chowdhury, Tamara

    2013-08-01

    Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.

  7. The intelligent user interface for NASA's advanced information management systems

    NASA Technical Reports Server (NTRS)

    Campbell, William J.; Short, Nicholas, Jr.; Rolofs, Larry H.; Wattawa, Scott L.

    1987-01-01

    NASA has initiated the Intelligent Data Management Project to design and develop advanced information management systems. The project's primary goal is to formulate, design and develop advanced information systems that are capable of supporting the agency's future space research and operational information management needs. The first effort of the project was the development of a prototype Intelligent User Interface to an operational scientific database, using expert systems and natural language processing technologies. An overview of Intelligent User Interface formulation and development is given.

  8. Using Collaborative Action Learning Projects to Increase the Impact of Management Development

    ERIC Educational Resources Information Center

    Lyso, Ingunn Hybertsen; Mjoen, Kristian; Levin, Morten

    2011-01-01

    This article aims to contribute to the field of human resource development by exploring the conditions that influence the organizational impact of action learning projects. Many organizations use such projects as an integral part of their management development programs. Past research on action learning projects has shown how balancing action and…

  9. AKM in Open Source Communities

    NASA Astrophysics Data System (ADS)

    Stamelos, Ioannis; Kakarontzas, George

    Previous chapters in this book have dealt with Architecture Knowledge Management in traditional Closed Source Software (CSS) projects. This chapterwill attempt to examine the ways that knowledge is shared among participants in Free Libre Open Source Software (FLOSS 1) projects and how architectural knowledge is managed w.r.t. CSS. FLOSS projects are organized and developed in a fundamentally different way than CSS projects. FLOSS projects simply do not develop code as CSS projects do. As a consequence, their knowledge management mechanisms are also based on different concepts and tools.

  10. Project management in the development of scientific software

    NASA Astrophysics Data System (ADS)

    Platz, Jochen

    1986-08-01

    This contribution is a rough outline of a comprehensive project management model for the development of software for scientific applications. The model was tested in the unique environment of the Siemens AG Corporate Research and Technology Division. Its focal points are the structuring of project content - the so-called phase organization, the project organization and the planning model used, and its particular applicability to innovative projects. The outline focuses largely on actual project management aspects rather than associated software engineering measures.

  11. I-15 integrated corridor management system : project management plan.

    DOT National Transportation Integrated Search

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and deployment of the ICM System. The PMP...

  12. Implementation of quality management in early stages of research and development projects at a university.

    PubMed

    Fiehe, Sandra; Wagner, Georg; Schlanstein, Peter; Rosefort, Christiane; Kopp, Rüdger; Bensberg, Ralf; Knipp, Peter; Schmitz-Rode, Thomas; Steinseifer, Ulrich; Arens, Jutta

    2014-04-01

    The ultimate objective of university research and development projects is usually to create knowledge, but also to successfully transfer results to industry for subsequent marketing. We hypothesized that the university technology transfer requires efficient measures to improve this important step. Besides good scientific practice, foresighted and industry-specific adapted documentation of research processes in terms of a quality management system might improve the technology transfer. In order to bridge the gap between research institute and cooperating industry, a model project has been accompanied by a project specific amount of quality management. However, such a system had to remain manageable and must not constrain the researchers' creativity. Moreover, topics and research team are strongly interdisciplinary, which entails difficulties regarding communication because of different perspectives and terminology. In parallel to the technical work of the model project, an adaptable quality management system with a quality manual, defined procedures, and forms and documents accompanying the research, development and validation was implemented. After process acquisition and analysis the appropriate amount of management for the model project was identified by a self-developed rating system considering project characteristics like size, innovation, stakeholders, interdisciplinarity, etc. Employees were trained according to their needs. The management was supported and the technical documentation was optimized. Finally, the quality management system has been transferred successfully to further projects.

  13. An IS Project Management Course Project

    ERIC Educational Resources Information Center

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  14. Transportation risk management : international practices for program development and project delivery.

    DOT National Transportation Integrated Search

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  15. Linking Theory with Practice: Undergraduate Project Management with School-Age Children.

    ERIC Educational Resources Information Center

    Falkenberg, Loren; Russell, Randy; Ricker, Lynne

    2000-01-01

    Management students taught basic business concepts to sixth graders and managed business projects with them. The management students applied knowledge of marketing, human resources, and operations management and developed reflective learning skills through project reports and coaching sessions. (SK)

  16. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  17. Application of expert systems in project management decision aiding

    NASA Technical Reports Server (NTRS)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  18. Examining the Dynamics of Managing Information Systems Development Projects: A Control Loss Perspective

    ERIC Educational Resources Information Center

    Narayanaswamy, Ravi

    2009-01-01

    The failure rate of information systems development (ISD) projects continues to pose a big challenge for organizations. The success rate of ISD projects is less then forty percent. Factors such as disagreements and miscommunications among project manager and team members, poor monitoring and intermediary problems contribute to project failure.…

  19. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  20. Report on a Knowledge-Based Software Assistant.

    DTIC Science & Technology

    1983-08-01

    maintainers, project managers , and end-users). In this paradigm, software activities, including definition, management , and validation will be...project management . This report also presents a plan for the development of the KBSA, along with a description of the necessary supporting technology...Activity Coordination .. .. .. ..... ...... ..... .... 19 3.2 Project Management and Documentation. .. ... ........ 20 3.2.1 Project Management Facet

  1. openSE: a Systems Engineering Framework Particularly Suited to Particle Accelerator Studies and Development Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonnal, P.; Féral, B.; Kershaw, K.

    Particle accelerator projects share many characteristics with industrial projects. However, experience has shown that best practice of industrial project management is not always well suited to particle accelerator projects. Major differences include the number and complexity of technologies involved, the importance of collaborative work, development phases that can last more than a decade, and the importance of telerobotics and remote handling to address future preventive and corrective maintenance requirements due to induced radioactivity, to cite just a few. The openSE framework it is a systems engineering and project management framework specifically designed for scientific facilities’ systems and equipment studies andmore » development projects. Best practices in project management, in systems and requirements engineering, in telerobotics and remote handling and in radiation safety management were used as sources of inspiration, together with analysis of current practices surveyed at CERN, GSI and ESS.« less

  2. Introduction to SIMRAND: Simulation of research and development project

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1982-01-01

    SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

  3. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  4. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  5. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  6. GREMEX- GODDARD RESEARCH AND ENGINEERING MANAGEMENT EXERCISE SIMULATION SYSTEM

    NASA Technical Reports Server (NTRS)

    Vaccaro, M. J.

    1994-01-01

    GREMEX is a man-machine management simulation game of a research and development project. It can be used to depict a project from just after the development of the project plan through the final construction phase. The GREMEX computer programs are basically a program evaluation and review technique (PERT) reporting system. In the usual PERT program, the operator inputs each month the amount of work performed on each activity and the computer does the bookkeeping to determine the expected completion date of the project. GREMEX automatically assumes that all activities due to be worked in the current month will be worked. GREMEX predicts new durations (and costs) each month based on management actions taken by the players and the contractor's abilities. Each activity is assigned the usual cost and duration estimates but must also be assigned three parameters that relate to the probability that the time estimate is correct, the probability that the cost estimate is correct, and the probability of technical success. Management actions usually can be expected to change these probabilities. For example, use of overtime or double shifts in research and development work will decrease duration and increase cost by known proportions and will also decrease the probability of technical success due to an increase in the likelihood of accidents or mistakes. These re-estimating future events and assigning probability factors provides life to the model. GREMEX is not a production job for project management. GREMEX is a game that can be used to train management personnel in the administration of research and development type projects. GREMEX poses no 'best way' to manage a project. The emphasis of GREMEX is to expose participants to many of the factors involved in decision making when managing a project in a government research and development environment. A management team can win the game by surpassing cost, schedule, and technical performance goals established when the simulation began. The serious management experimenter can use GREMEX to explore the results of management methods they could not risk in real life. GREMEX can operate with any research and development type project with up to 15 subcontractors and produces reports simulating monthly or quarterly updates of the project PERT network. Included with the program is a data deck for simulation of a fictitious spacecraft project. Instructions for substituting other projects are also included. GREMEX is written in FORTRAN IV for execution in the batch mode and has been implemented on an IBM 360 with a central memory requirement of approximately 350K (decimal) of 8 bit bytes. The GREMEX system was developed in 1973.

  7. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...

  8. Improving System Engineering Excellence at NASA's Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Takada, Pamela Wallace; Newton, Steve; Gholston, Sampson; Thomas, Dale (Technical Monitor)

    2001-01-01

    NASA's Marshall Space Flight Center (MSFC) management feels that sound system engineering practices are essential for successful project management, NASA studies have concluded that recent project failures could be attributed in part to inadequate systems engineering. A recent survey of MSFC project managers and system engineers' resulted in the recognition of a need for training in Systems Engineering Practices, particularly as they relate to MSFC projects. In response to this survey, an internal pilot short-course was developed to reinforce accepted practices for system engineering at MSFC. The desire of the MSFC management is to begin with in-house training and offer additional educational opportunities to reinforce sound system engineering principles to the more than 800 professionals who are involved with system engineering and project management. A Systems Engineering Development Plan (SEDP) has been developed to address the longer-term systems engineering development needs of MSFC. This paper describes the survey conducted and the training course that was developed in response to that survey.

  9. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    ERIC Educational Resources Information Center

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  10. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  11. Short Duration Emergency Incidents Managed as Projects

    NASA Astrophysics Data System (ADS)

    Nixon, Thomas J.

    Emergency incidents have historically been managed by experience and some directional principles usually found in SOPs/SOGs or other pre-incident planning documents. The use of experience has the risk of bias influencing the decisions being made in truly life or death situations. Responders of disasters, long duration emergency incidents, are often equipped with a framework adapted to the project management lifecycle to assure the project priorities are adequately addressed. The disaster framework provides for savings from risk, loss, waste. This research is demonstrating the ability and reasoning to develop a framework to address short duration emergency incidents and expand the events that can be managed as a project. The research of the literature found that a framework can be applied to the project management lifecycle and the priorities of a short duration emergency incident can be managed as a project. The limitations of not having the ability to conduct empirical testing and the risks of not developing a formal implementation plan are discussed. Short duration emergency incidents are found to be capable of being managed as projects and will benefit from the effectiveness of project management methodologies.

  12. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  13. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  14. Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

    NASA Technical Reports Server (NTRS)

    Simon, Tom

    2009-01-01

    To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

  15. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  16. United States Army Medical Materiel Development Activity: 1997 Annual Report.

    DTIC Science & Technology

    1997-01-01

    business planning and execution information management system (Project Management Division Database ( PMDD ) and Product Management Database System (PMDS...MANAGEMENT • Project Management Division Database ( PMDD ), Product Management Database System (PMDS), and Special Users Database System:The existing...System (FMS), were investigated. New Product Managers and Project Managers were added into PMDS and PMDD . A separate division, Support, was

  17. The DEVELOP Program as a Unique Applied Science Internship

    NASA Astrophysics Data System (ADS)

    Skiles, J. W.; Schmidt, C. L.; Ruiz, M. L.; Cawthorn, J.

    2004-12-01

    The NASA mission includes "Inspiring the next generation of explorers" and "Understanding and protecting our home planet". DEVELOP students conduct research projects in Earth Systems Science, gaining valuable training and work experience, which support accomplishing this mission. This presentation will describe the DEVELOP Program, a NASA human capital development initiative, which is student run and student led with NASA scientists serving as mentors. DEVELOP began in 1998 at NASA's Langley Research Center in Virginia and expanded to NASA's Stennis Space Center in Mississippi and Marshall Space Flight Center in Alabama in 2002. NASA's Ames Research Center in California began DEVELOP activity in 2003. DEVELOP is a year round activity. High school through graduate school students participate in DEVELOP with students' backgrounds encompassing a wide variety of academic majors such as engineering, biology, physics, mathematics, computer science, remote sensing, geographic information systems, business, and geography. DEVELOP projects are initiated when county, state, or tribal governments submit a proposal requesting students work on local projects. When a project is selected, science mentors guide students in the application of NASA applied science and technology to enhance decision support tools for customers. Partnerships are established with customers, professional organizations and state and federal agencies in order to leverage resources needed to complete research projects. Student teams are assigned a project and are responsible for creating an inclusive project plan beginning with the design and approach of the study, the timeline, and the deliverables for the customer. Project results can consist of student papers, both team and individually written, face-to-face meetings and seminars with customers, presentations at national meetings in the form of posters and oral papers, displays at the Western and Southern Governors' Associations, and visualizations produced by the students. Projects have included Homeland Security in Virginia, Energy Management in New Mexico, Water Management in Mississippi, Air Quality Management in Alabama, Invasive Species mapping in Nevada, Public Health risk assessment in California, Disaster Management in Oklahoma, Agricultural Efficiency in South Dakota, Coastal Management in Louisiana and Carbon Management in Oregon. DEVELOP students gain experience in applied science, computer technology, and project management. Several DEVELOP projects will be demonstrated and discussed during this presentation. DEVELOP is sponsored by the Applications Division of NASA's Science Mission Directorate.

  18. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    PubMed

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  19. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences

    PubMed Central

    Wooten, Kevin C.; Dann, Sara M.; Finnerty, Celeste C.; Kotarba, Joseph A.

    2015-01-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle. PMID:25621288

  20. Impact of agile methodologies on team capacity in automotive radio-navigation projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Hutanu, A.; Volker, S.

    2017-01-01

    The development processes used in automotive radio-navigation projects are constantly under adaption pressure. While the software development models are based on automotive production processes, the integration of peripheral components into an automotive system will trigger a high number of requirement modifications. The use of traditional development models in automotive industry will bring team’s development capacity to its boundaries. The root cause lays in the inflexibility of actual processes and their adaption limits. This paper addresses a new project management approach for the development of radio-navigation projects. The understanding of weaknesses of current used models helped us in development and integration of agile methodologies in traditional development model structure. In the first part we focus on the change management methods to reduce request for change inflow. Established change management risk analysis processes enables the project management to judge the impact of a requirement change and also gives time to the project to implement some changes. However, in big automotive radio-navigation projects the saved time is not enough to implement the large amount of changes, which are submitted to the project. In the second phase of this paper we focus on increasing team capacity by integrating at critical project phases agile methodologies into the used traditional model. The overall objective of this paper is to prove the need of process adaption in order to solve project team capacity bottlenecks.

  1. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  2. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  3. Managing Programmatic Risk for Complex Space System Developments

    NASA Technical Reports Server (NTRS)

    Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)

    2001-01-01

    Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

  4. Knowledge Management Orientation: An Innovative Perspective to Hospital Management.

    PubMed

    Ghasemi, Matina; Ghadiri Nejad, Mazyar; Bagzibagli, Kemal

    2017-12-01

    By considering innovation as a new project in hospitals, all the project management's standard steps should be followed in execution. This study investigated the validation of a new set of measures in terms of providing a procedure for knowledge management-oriented innovation that enriches the hospital management system. The relation between innovation and all the knowledge management areas, as the main constructs of project management, was illustrated by referring to project management standard steps and previous studies. Through consultations and meetings with a committee of professional project managers, a questionnaire was developed to measure ten knowledge management areas in hospital's innovation process. Additionally, a group of experts from hospital managers were invited to comment on the applicability of the questionnaires by considering if the items are measurable in hospitals practically. A close-ended, Likert-type scale items, consisted of ten sections, were developed based on project management body of knowledge thorough Delphi technique. It enables the managers to evaluate hospitals' situation to be aware whether the organization follows the knowledge management standards in innovation process or not. By pilot study, confirmatory factor analysis and exploratory factor analysis were conducted to ensure the validity and reliability of the measurement items. The developed items seem to have a potential to help hospital managers and subsequently delivering new products/services successfully based on the standard procedures in their organization. In all innovation processes, the knowledge management areas and their standard steps help hospital managers by a new tool as questionnaire format.

  5. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  6. Astronomical large projects managed with MANATEE: management tool for effective engineering

    NASA Astrophysics Data System (ADS)

    García-Vargas, M. L.; Mujica-Alvarez, E.; Pérez-Calpena, A.

    2012-09-01

    This paper describes MANATEE, which is the Management project web tool developed by FRACTAL, specifically designed for managing large astronomical projects. MANATEE facilitates the management by providing an overall view of the project and the capabilities to control the three main projects parameters: scope, schedule and budget. MANATEE is one of the three tools of the FRACTAL System & Project Suite, which is composed also by GECO (System Engineering Tool) and DOCMA (Documentation Management Tool). These tools are especially suited for those Consortia and teams collaborating in a multi-discipline, complex project in a geographically distributed environment. Our Management view has been applied successfully in several projects and currently is being used for Managing MEGARA, the next instrument for the GTC 10m telescope.

  7. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Owens, C. M.

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  8. Less of Me

    NASA Technical Reports Server (NTRS)

    Owen, Tim

    2002-01-01

    The author warns that micromanagement of projects can provoke defensive attitudes among employees, and inhibits their professional development. Nevertheless, project managers should still demand some accountability from their subordinates. The article draws upon his own experiences as a NASA project manager and under NASA project managers for these lessons.

  9. 75 FR 51441 - Mid-Atlantic Fishery Management Council (MAFMC); Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-20

    ... development of the Visioning Project. DATES: The meeting will be held Thursday, September 9, 2010, from 10 a.m...: The purpose of this meeting is to begin the development of the Council's Visioning Project. The... project goals. The initial purpose of the project is to identify stakeholders' views on the management...

  10. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  11. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  12. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  13. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  14. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  15. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  16. 7 CFR 3570.93 - Regional Commission grants.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... to all ARC grants administered by Rural Development. Therefore, a separate Project Management... Commissions are handled in accordance with a separate Project Management Agreement between the respective... and Economic Development Act of 1965) for projects eligible for RHS assistance. RHS has agreed to...

  17. Decision support tools to support the operations of traffic management centers (TMC)

    DOT National Transportation Integrated Search

    2011-01-31

    The goal of this project is to develop decision support tools to support traffic management operations based on collected intelligent transportation system (ITS) data. The project developments are in accordance with the needs of traffic management ce...

  18. Reducing Risk for the Next Generation Nuclear Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John M. Beck II; Harold J. Heydt; Emmanuel O. Opare

    2010-07-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project.more » Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.« less

  19. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  20. Intellectual Production Supervision Perform based on RFID Smart Electricity Meter

    NASA Astrophysics Data System (ADS)

    Chen, Xiangqun; Huang, Rui; Shen, Liman; chen, Hao; Xiong, Dezhi; Xiao, Xiangqi; Liu, Mouhai; Xu, Renheng

    2018-03-01

    This topic develops the RFID intelligent electricity meter production supervision project management system. The system is designed for energy meter production supervision in the management of the project schedule, quality and cost information management requirements in RFID intelligent power, and provide quantitative information more comprehensive, timely and accurate for supervision engineer and project manager management decisions, and to provide technical information for the product manufacturing stage file. From the angle of scheme analysis, design, implementation and test, the system development of production supervision project management system for RFID smart meter project is discussed. Focus on the development of the system, combined with the main business application and management mode at this stage, focuses on the energy meter to monitor progress information, quality information and cost based information on RFID intelligent power management function. The paper introduces the design scheme of the system, the overall client / server architecture, client oriented graphical user interface universal, complete the supervision of project management and interactive transaction information display, the server system of realizing the main program. The system is programmed with C# language and.NET operating environment, and the client and server platforms use Windows operating system, and the database server software uses Oracle. The overall platform supports mainstream information and standards and has good scalability.

  1. A project management system for the X-29A flight test program

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  2. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    NASA Technical Reports Server (NTRS)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  3. Charleston Harbor, SC, Regional Sediment Management Study; Beneficial Use of Dredged Material through Nearshore Placement

    DTIC Science & Technology

    2017-05-01

    Project 454632, “Charleston Harbor, SC, Regional Sediment Management Study” Project . The HQUSACE RSM Program Manager was Ms. Linda S. Lillycrop, U.S. Army...objective of the U.S. Army Corps of Engineers (USACE) RSM Program is to improve the management of sediments across multiple projects , manage sediments as a...optimize use of sediments and streamline projects . The adaptive management strategies are developed and implemented through application of the best

  4. Charleston Harbor, SC, Regional Sediment Management Study: Beneficial Use of Dredged Material through Nearshore Placement

    DTIC Science & Technology

    2017-05-01

    Project 454632, “Charleston Harbor, SC, Regional Sediment Management Study” Project . The HQUSACE RSM Program Manager was Ms. Linda S. Lillycrop, U.S. Army...objective of the U.S. Army Corps of Engineers (USACE) RSM Program is to improve the management of sediments across multiple projects , manage sediments as a...optimize use of sediments and streamline projects . The adaptive management strategies are developed and implemented through application of the best

  5. 78 FR 7427 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-01

    ... Waters Canoe Area Wilderness (BWCAW) Non-native Plant Management Project, Cook, Lake and St. Louis... Development Project, Approval of Gaming Development and Management, Spokane County, WA, Review Period Ends: 03... EIS, AFS, OR, Rim Paunina Project and Forest Plan Amendments, Crescent Ranger District, Deschutes...

  6. NASA Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    Fleming, Jon F.; Poole, Kenneth W.

    2016-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  7. Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    2010-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  8. Using a Dual Role Assignment to Improve Group Dynamics and Performance: The Effects of Facilitating Social Capital in Teams

    ERIC Educational Resources Information Center

    Aquino, Karl; Serva, Mark A.

    2005-01-01

    This article describes a project that simulates the interplay between management and development project teams in a business environment. Each student team was assigned a management role supervising one project and a development role implementing another project. Results indicate that teams that communicate regularly and interact socially outside…

  9. Success Rates by Software Development Methodology in Information Technology Project Management: A Quantitative Analysis

    ERIC Educational Resources Information Center

    Wright, Gerald P.

    2013-01-01

    Despite over half a century of Project Management research, project success rates are still too low. Organizations spend a tremendous amount of valuable resources on Information Technology projects and seek to maximize the utility gained from their efforts. The author investigated the impact of software development methodology choice on ten…

  10. Developing Communities of Practice around e-Learning and Project Management

    ERIC Educational Resources Information Center

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  11. The Supervisor in the Project-Organized Group Work Should Participate in Developing the Students' Project Competencies

    ERIC Educational Resources Information Center

    Hansen, Soren

    2004-01-01

    Most work done by engineers today is organized in projects and very often as teamwork. When educating towards employability, it is therefore important that the students develop competencies in areas such as project management, collaboration and teamwork. In companies using human resource management, we find similar expectations to the engineers'…

  12. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  13. Issues in NASA program and project management. Special report: 1995 conference

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the tenth in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1996 Conference as follows: international partnerships; industry/interagency collaboration; technology transfer; and project management development process. A section on resources for NASA managers rounds out the publication.

  14. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 13 2013-01-01 2013-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  15. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 13 2012-01-01 2012-01-01 false Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  16. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 13 2011-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  17. 7 CFR 1948.78 - Growth management and housing planning projects.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 13 2014-01-01 2013-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  18. Continuous Risk Management at NASA

    NASA Technical Reports Server (NTRS)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

  19. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  20. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  1. Influence of the economy crisis on project cost management

    NASA Astrophysics Data System (ADS)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  2. 2017 TRIAD Small Business Advisory Panel

    DTIC Science & Technology

    2017-10-11

    government service in 2007 as the Science & Technology (S&T) Project Manager for the United States Navy’s Unmanned Maritime Systems Program Office...National Renewable Energy Laboratory (NREL) as a Program Manager for over 110 energy and water projects on military installations. He worked... management , project management , program management , donor relation service, contract and subcontract policy development and implementation, data integrity

  3. A CMMI-based approach for medical software project life cycle study.

    PubMed

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  4. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    PubMed

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  5. Knowledge Management Orientation: An Innovative Perspective to Hospital Management

    PubMed Central

    GHASEMI, Matina; GHADIRI NEJAD, Mazyar; BAGZIBAGLI, Kemal

    2017-01-01

    Background: By considering innovation as a new project in hospitals, all the project management’s standard steps should be followed in execution. This study investigated the validation of a new set of measures in terms of providing a procedure for knowledge management-oriented innovation that enriches the hospital management system. Methods: The relation between innovation and all the knowledge management areas, as the main constructs of project management, was illustrated by referring to project management standard steps and previous studies. Through consultations and meetings with a committee of professional project managers, a questionnaire was developed to measure ten knowledge management areas in hospital’s innovation process. Additionally, a group of experts from hospital managers were invited to comment on the applicability of the questionnaires by considering if the items are measurable in hospitals practically. Results: A close-ended, Likert-type scale items, consisted of ten sections, were developed based on project management body of knowledge thorough Delphi technique. It enables the managers to evaluate hospitals’ situation to be aware whether the organization follows the knowledge management standards in innovation process or not. By pilot study, confirmatory factor analysis and exploratory factor analysis were conducted to ensure the validity and reliability of the measurement items. Conclusion: The developed items seem to have a potential to help hospital managers and subsequently delivering new products/services successfully based on the standard procedures in their organization. In all innovation processes, the knowledge management areas and their standard steps help hospital managers by a new tool as questionnaire format. PMID:29259938

  6. The Utilization of Project Management in the Pharmaceutical Industry.

    ERIC Educational Resources Information Center

    Krusko, Diane; Cangemi, Robert R.

    1987-01-01

    A survey of 99 pharmaceutical companies concerning their organization and use of project management techniques for research and development found that the industry is using project management increasingly in a variety of ways for better business planning and operations. (MSE)

  7. Choosing and Developing the Right Leadership Styles for Projects

    NASA Technical Reports Server (NTRS)

    Mueller, Ralf

    2008-01-01

    Analyzing extensive questionnaires completed by 400 project management professionals, Professor Rodney Turner of the Lille Graduate School of Management and I have identified competencies that contribute significantly to project management success. Our research helps define the managerial and emotional competencies needed to make projects work. We also found that different kinds of projects call for different combinations of competencies.

  8. The Impact of NPG 7120.5A Upon Training and Development

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J.

    1998-01-01

    NASA Procedures and Guidance 7120.5A for Program and Project Management Processes and Requirements should have minimal effect upon current Agency training and development programs - mainly because the new directive simply formalizes what we have been teaching and learning in the NASA Program/Project Management Initiative all along. A frequent complaint we get from the 8,000 or so graduates of our PPMI courses over the years, however, deals with resistance to what they may have learned in the classroom or training site. Brimming with new ideas, these young men and women often run up against an entrenched program or project manager who insists that things be done "the old way," too often perceived as "the NASA way" or even "the Goddard way." Management was all too often in the eyes of the manager; now we're all reading from the same book, 7120.5A, Still, there is no single method or "one size fits all" approach to project management in NASA. While each Center is responsible for developing policies, processes and procedures to comply with the new NPG, individual program and project managers will still need to tailor their requirements to the specific needs of the project, consistent with the size, complexity, risk and criticality of the project. Under NPG 7120.5A, the results of such tailoring are to be documented in agreements among managers, directors, Enterprise Associate Administrators and the Administrator.

  9. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  10. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  11. Development of the digital design environment ProjectWise(TM) - phase 1.

    DOT National Transportation Integrated Search

    2017-04-28

    The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hobbs, R.E.

    In large facilities, successful energy management cannot be measured by a few projects, no matter how significant the energy savings. Large facilities today are comprised of extensive energy consuming systems. For every energy project developed, two more projects remain to be discovered. The successful energy manager is one who has completed ten projects, or twenty, or thirty, and is still finding more projects to do. Nothing is assumed to be as efficient as possible, and no part of any system is ignored. The successful energy manager is willing to take risks, not of being fired, but to use imagination, studymore » engineering theory, exercise common sense, develop concept designs, calculate savings, sell projects to management, control designers, study equipment performance, pre-select contractors, manage the contractor efforts, solve inherent problems along the way, and then optimize the project after acceptance when the designers and contractors all walk off. Once the successful energy manager establishes his credibility, his problem becomes finding enough time to get the projects rolling as he dreams them up. He sees what others do not. As they say in the North, only the lead dog sees new scenery.« less

  13. Software risk management through independent verification and validation

    NASA Technical Reports Server (NTRS)

    Callahan, John R.; Zhou, Tong C.; Wood, Ralph

    1995-01-01

    Software project managers need tools to estimate and track project goals in a continuous fashion before, during, and after development of a system. In addition, they need an ability to compare the current project status with past project profiles to validate management intuition, identify problems, and then direct appropriate resources to the sources of problems. This paper describes a measurement-based approach to calculating the risk inherent in meeting project goals that leverages past project metrics and existing estimation and tracking models. We introduce the IV&V Goal/Questions/Metrics model, explain its use in the software development life cycle, and describe our attempts to validate the model through the reverse engineering of existing projects.

  14. The System of Management of Innovation Projects at a Higher Education

    ERIC Educational Resources Information Center

    Kalimullin, Aydar M.; Youngblood, Valery ?.; Khodyreva, Elana A.

    2016-01-01

    The urgency of the issue discussed in this article is caused by the need for development and assessment of new models and mechanisms of management of higher education institutions, which are connected with the development of the system of management of innovation projects and contribute to the development of educational institutions. The aim of…

  15. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  16. Targeted On-Demand Team Performance App Development

    DTIC Science & Technology

    2018-02-01

    ACCOMPLISHMENTS: Major Goals Task Description Status 1 Project Management Administration, oversight and management of all program tasks, expenditures...reporting charts, financial and project management protocols. Create, complete, and submit all documentation for program office and designated... project provided? All subjects participated in simulated emergency medicine events that included concurrent management of three patients with

  17. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  18. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  19. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  20. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  1. Managing Tipping Point Dynamics in Single Development Projects

    DTIC Science & Technology

    2006-04-30

    Journal of Product Innovation Management , 22(2005), 177-192. Lyneis, F., Cooper, K., & Els, S. (2001). Strategic management of complex projects: A case...new product development. Journal of Product Innovation Management ,18(2001), 265-300. Richardson, G.P., & Pugh, A.L. (1981). Introduction to... Product Innovation Management , 17(2000), 128- 142. United States General Accounting Office (USGAO). (1996). Department of Energy: Opportunity to improve

  2. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  3. First-line nurse leaders' health-care change management initiatives.

    PubMed

    Macphee, Maura; Suryaprakash, Nitya

    2012-03-01

    To examine nurse leaders' change management projects within British Columbia, Canada. British Columbia Nursing Leadership Institute 2007-10 attendees worked on year-long change management initiatives/projects of importance to their respective health-care institutions. Most leaders were in first-line positions with <3 years' experience. Consenting leaders' project reports (N = 133) were content analysed for specific themes: types of projects; scope of projects (e.g. unit or local level, departmental, institutional); influence targets or key stakeholder groups targeted by the projects; leadership successes and challenges. Of study participants, 77% successfully completed their projects. Staff tool and resource development and existing services improvement were major project types. Care delivery teams were the major influence targets. Only 25% of projects were at the unit level. Many projects had broader scopes, such as institutional levels. Participants cited multiple leadership successes, including enhanced leadership styles and organizational skills. First-line nurse leaders were able to successfully manage projects beyond their traditional scope of responsibilities. The majority of projects dealt with staff needs and healthcare restructuring initiatives. Constant change is a global reality. Change management, a universal competency, must be included in leadership development programmes. © 2011 Blackwell Publishing Ltd.

  4. Managing the Software Development Process

    NASA Technical Reports Server (NTRS)

    Lubelczky, Jeffrey T.; Parra, Amy

    1999-01-01

    The goal of any software development project is to produce a product that is delivered on time, within the allocated budget, and with the capabilities expected by the customer and unfortunately, this goal is rarely achieved. However, a properly managed project in a mature software engineering environment can consistently achieve this goal. In this paper we provide an introduction to three project success factors, a properly managed project, a competent project manager, and a mature software engineering environment. We will also present an overview of the benefits of a mature software engineering environment based on 24 years of data from the Software Engineering Lab, and suggest some first steps that an organization can take to begin benefiting from this environment. The depth and breadth of software engineering exceeds this paper, various references are cited with a goal of raising awareness and encouraging further investigation into software engineering and project management practices.

  5. Quality of Project Management Education and Training Programmes

    NASA Astrophysics Data System (ADS)

    Bodea, Constanta-Nicoleta; Dascalu, Maria; Coman, Melania

    The paper refers to the factors which influence the quality of training and education on project management. A survey was made and the main results are presented. 81 % of the responses came from China. The rest were professionals of different EU nationalities. The percentage of Project Managers who answered the questions is rather low - 8%. In the "Others" category, we have software developers, financial managers and professors, who are involved in both training on project management, but also as team members or team managers in projects, thus ensuring a balanced overview of both theory and practical issues.

  6. Civilian Agency Industry Working Group EVM World Update

    NASA Technical Reports Server (NTRS)

    Kerby, Jerald

    2013-01-01

    Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.

  7. Using electronic document management systems to manage highway project files.

    DOT National Transportation Integrated Search

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  8. Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

    NASA Technical Reports Server (NTRS)

    Michaels, Jeffrey

    1994-01-01

    These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

  9. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  10. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  11. Development of Novel Local Analgesics for Management of Acute Tissue Injury Pain

    DTIC Science & Technology

    2017-09-01

    assess biodistribution, tolerance and toxicity of candidate NCEs. 15% complete The goal of our project is to develop a new approach to the management ... Project Manager Boston Biomedical Innovation Center 215 First Street, Suite 500; Cambridge, MA 02142 857-307-2441 | rblackman1@partners.org | b...AWARD NUMBER: W81XWH-15-1-0480 TITLE: Development of Novel Local Analgesics for Management of Acute Tissue Injury Pain PRINCIPAL

  12. Project risk management in the construction of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  13. Combining Project Management Methods: A Case Study of Dlstributed Work Practices

    NASA Astrophysics Data System (ADS)

    Backlund, Per; Lundell, Björn

    The increasing complexity of information systems development (ISD) projects call for improved project management practices. This, together with an endeavour to improve the success rate of ISD projects (Lyytinen and Robey 1999; Cooke-Davies 2002; White and Fortune 2002), has served as drivers for various efforts in process improvement such as the introduction of new development methods (Fitzgerald 1997; Iivari and Maansaari 1998).

  14. Issues in NASA Program and Project Management:: A Collection of Papers on Aerospace Management Issues (Supplement 11)

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1996-01-01

    Papers address the following topics: NASA's project management development process; Better decisions through structural analysis; NASA's commercial technology management system; Today's management techniques and tools; Program control in NASA - needs and opportunities; and Resources for NASA managers.

  15. NAIT CPD. Competency Profile Development: A Systems Approach for Program Review Projects.

    ERIC Educational Resources Information Center

    Dhariwal, Mave

    The Engineering Technologies Division of the Northern Alberta Institute of Technology (NAIT) in Canada has developed a systems approach to program review called Competency Profile Development (CPD). This approach utilizes a combination of organizational communication, project management, management-by-objectives, a modified Developing A Curriculum…

  16. Reengineering outcomes management: an integrated approach to managing data, systems, and processes.

    PubMed

    Neuman, K; Malloch, K; Ruetten, V

    1999-01-01

    The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.

  17. Entrepreneurship skills development through project-based activity in Bachelor of Pharmacy program.

    PubMed

    Shahiwala, Aliasgar

    2017-07-01

    To provide pharmacy students with an opportunity to develop entrepreneurial thinking and skills. A business proposal building project-based activity was integrated into a two-credit hour pharmacy management course during the eighth semester of the bachelor of pharmacy degree program. The student groups submitted their proposals, mimicking the process of submitting business proposals and obtaining approval in the real world. Essential management tasks including operation procedures, location and layout design, inventory management, personnel management, marketing management, and finance management were taught step-by-step so that students could work on a similar scenario with their proposal building. Students' career preferences were also measured at the beginning and end of the course. Course was assessed by written exffigam and rubric based project evaluation. Student feedbacks of the project were collected using a five-point Likert scale. The project-based activity was well integrated in the course. The project helped the students (n=72) to understand management concepts more clearly, which was reflected by their significantly higher (p<0.01) grades compared to previous year. Students' feedback was overwhelmingly positive (mean score of 4.53 on the scale of 5). Students developed both interest and confidence to start a pharmacy as a result of this activity. The project was successfully designed and executed in a pharmacy management course within a bachelor of pharmacy curriculum. Based on the response received in this project, efforts will be made to provide guidance and support to the students by calling field experts such as pharmacy owners and financiers. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Using computer software to improve group decision-making.

    PubMed

    Mockler, R J; Dologite, D G

    1991-08-01

    This article provides a review of some of the work done in the area of knowledge-based systems for strategic planning. Since 1985, with the founding of the Center for Knowledge-based Systems for Business Management, the project has focused on developing knowledge-based systems (KBS) based on these models. In addition, the project also involves developing a variety of computer and non-computer methods and techniques for assisting both technical and non-technical managers and individuals to do decision modelling and KBS development. This paper presents a summary of one segment of the project: a description of integrative groupware useful in strategic planning. The work described here is part of an ongoing research project. As part of this project, for example, over 200 non-technical and technical business managers, most of them working full-time during the project, developed over 160 KBS prototype systems in conjunction with MBA course in strategic planning and management decision making. Based on replies to a survey of this test group, 28 per cent of the survey respondents reported their KBS were used at work, 21 per cent reportedly received promotions, pay rises or new jobs based on their KBS development work, and 12 per cent reported their work led to participation in other KBS development projects at work. All but two of the survey respondents reported that their work on the KBS development project led to a substantial increase in their job knowledge or performance.

  19. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  20. Waste management CDM projects barriers NVivo 10® qualitative dataset.

    PubMed

    Bufoni, André Luiz; de Sousa Ferreira, Aracéli Cristina; Oliveira, Luciano Basto

    2017-12-01

    This article contains one NVivo 10® file with the complete 432 projects design documents (PDD) of seven waste management sector industries registered as Clean Development Mechanism (CDM) under United Nations Framework Convention on Climate Change (UNFCCC) Kyoto Protocol Initiative from 2004 to 2014. All data analyses and sample statistics made during the research remain in the file. We coded PDDs in 890 fragments of text, classified in five categories of barriers (nodes): technological, financial, human resources, regulatory, socio-political. The data supports the findings of author thesis [1] and other two indexed publication in Waste Management Journal: "The financial attractiveness assessment of large waste management projects registered as clean development mechanism" and "The declared barriers of the large developing countries waste management projects: The STAR model" [2], [3]. The data allows any computer assisted qualitative content analysis (CAQCA) on the sector and it is available at Mendeley [4].

  1. Augmenting SCA project management and automation framework

    NASA Astrophysics Data System (ADS)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  2. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  3. Emily Evans | NREL

    Science.gov Websites

    Evans Emily Evans Project Controller Emily.Evans@nrel.gov | 303-275-3125 Emily joined NREL in 2010 . As a Project Administrator in the Integrated Applications Center, Emily works with project managers and teams to develop and maintain project management excellence on large-scale, multi-year projects

  4. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  5. The SIMRAND methodology - Simulation of Research and Development Projects

    NASA Technical Reports Server (NTRS)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  6. Project Management Professional Development: An Industry Led Programme.

    ERIC Educational Resources Information Center

    Gale, Andrew; Brown, Mike

    2003-01-01

    Describes a modular master's program in project management. Explores relationships between return on investment, management competencies, and learning outcomes in the context of industry-academic partnerships. Discusses the managed learning environment using WebCT. (Contains 40 references.) (SK)

  7. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  8. Project nurse manager: an intrapreneurial role.

    PubMed

    Risner, P B; Anderson, M L

    1994-01-01

    Nurse intrapreneurs are the key to innovation and cost-effective health care in the 1990s. A project nurse manager, acting as a liaison between service departments, can provide the vision and insight for the successful outcome of such projects as product evaluation, unit renovation, and the development of a new facility. The role, benefits, and outcomes of one project nurse manager are described.

  9. MG SPROUTS: A Project-in-a-Box Approach to Educational Programming

    ERIC Educational Resources Information Center

    Dorn,Sheri; Slagle, Krissy

    2016-01-01

    MG SPROUTS was developed as a "project-in-a-box" program, a self-contained educational programming tool for Extension agents working with master gardener Extension volunteers (MGEVs). The program design incorporates programmatic materials and project management materials and follows best management practices for volunteer management. MG…

  10. Instructional Design and Project Management: Complementary or Divergent?

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  11. The dynamics of software development project management: An integrative systems dynamic perspective

    NASA Technical Reports Server (NTRS)

    Vandervelde, W. E.; Abdel-Hamid, T.

    1984-01-01

    Rather than continuing to focus on software development projects per se, the system dynamics modeling approach outlined is extended to investigate a broader set of issues pertaining to the software development organization. Rather than trace the life cycle(s) of one or more software projects, the focus is on the operations of a software development department as a continuous stream of software products are developed, placed into operation, and maintained. A number of research questions are ""ripe'' for investigating including: (1) the efficacy of different organizational structures in different software development environments, (2) personnel turnover, (3) impact of management approaches such as management by objectives, and (4) the organizational/environmental determinants of productivity.

  12. Murchison project organization and control. [North Sea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lauzen, P.K.; Hall, J.N.

    This paper describes the project management organization and the management control systems used for Conoco's Murchison field development in the North Sea. These systems created for Murchison proved largely successful and have been enhanced for use during the Hutton field development. Management concepts are described in the context of the cost control system.

  13. A Case Study on the Failure of Management Controls around Expected Benefit Development

    ERIC Educational Resources Information Center

    Parsons, Earl H.

    2013-01-01

    Organization leaders manage change through projects to realize specific expected benefits. Under Expectation-Confirmation theory, expected benefits can be used to judge the ongoing viability and final success of the project. Organization leaders often develop management controls to ensure that the expected benefits are defined to allow their use…

  14. Health Care Administrators. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    The result of a project to develop short courses to help health care administrators and supervisors in developing practical, up-to-date management skills, this instructional workbook provides information and exercises applicable to on-the-job situations. Unit I covers the following leadership considerations: self-awareness, time management,…

  15. An Adaptive Approach to Managing Knowledge Development in a Project-Based Learning Environment

    ERIC Educational Resources Information Center

    Tilchin, Oleg; Kittany, Mohamed

    2016-01-01

    In this paper we propose an adaptive approach to managing the development of students' knowledge in the comprehensive project-based learning (PBL) environment. Subject study is realized by two-stage PBL. It shapes adaptive knowledge management (KM) process and promotes the correct balance between personalized and collaborative learning. The…

  16. Demonstrating and Evaluating an Action Learning Approach to Building Project Management Competence

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Starr, Stan; Steinrock, T. (Technical Monitor)

    2001-01-01

    This paper contributes a description of an action-learning approach to building project management competence. This approach was designed, implemented, and evaluated for use with the Dynacs Engineering Development Contract at the Kennedy Space Center. The aim of the approach was to improve three levels of competence within the organization: individual project management skills, project team performance. and organizational capabilities such as the project management process and tools. The overall steps to the approach, evaluation results, and lessons learned are presented. Managers can use this paper to design a specific action-learning approach for their organization.

  17. Practical Approaches to Curriculum Development. A Management Handbook. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 2.

    ERIC Educational Resources Information Center

    Gardner, David C.; Beatty, Grace Joely

    Within the context of the major objectives of developing, field testing, and refining the curriculum materials described in volume 1 of this final report (CE 024 117), Volume 2 describes and critiques the management system used by Project HIRE in that development process. (See Note for availability of curriculum materials.) Chapter 1 introduces…

  18. Project Management of Army Aircraft Survivability Equipment

    DTIC Science & Technology

    1976-11-01

    develop- ment trade-offs; and request for proposal (RFP) reviews involving advanced development (AD), engineering development (ED), and pro- ducibility...Safety: Ensur~e that adequate consideration is given safetyf throughout the life cycle of aviation surviva- bility equipment. -13. Project Manager Training...rate management effort to assure an orderly progression through its life cyIcle. Many of the items carry an urgent priority for worldwide applicatic

  19. Analytical Support to Defence Transformation (Le soutien analytique a la transformation de la Defense)

    DTIC Science & Technology

    2010-04-01

    analytical community. 5.1 Towards a Common Understanding of CD&E and CD&E Project Management Recent developments within NATO have contributed to the... project management purposes it is useful to distinguish four phases [P 21]: a) Preparation, Initiation and Structuring; b) Concept Development Planning...examined in more detail below. While the NATO CD&E policy provides a benchmark for a comprehensive, disciplined management of CD&E projects , it may

  20. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  1. Characteristic Features of Innovation Project Management Aimed at University Human Resource Development

    ERIC Educational Resources Information Center

    Kalimullin, Aydar M.; Yungblud, Valery T.; Khodyreva, Elena A.

    2016-01-01

    The relevance of the studied issue is based on the need to develop theoretical approaches to project management at a higher educational institution taking into consideration the specifics of the subject area of the projects that ensure finding the "growth points" and addressing the long-term objectives of a university in the field of…

  2. Mobilizing and Managing Social Capital: On Roles and Responsibilities of Local Facilitators in Territorial Development

    ERIC Educational Resources Information Center

    Schermer, Markus; Kirchengast, Christoph; Petit, Sandrine; Magnani, Natalia; Mieville-Ott, Valerie

    2010-01-01

    The paper explores the difficulties and challenges in mobilizing and managing social capital in concrete local and territorial directed rural development project activities. The main focus is put on the roles of local facilitators working with farmers and other local stakeholders during project implementation. The EU 5th framework project IMALP…

  3. Avoiding re-inventing the wheel in a people-centered approach to REDD+.

    PubMed

    Holmes, Ignacia; Potvin, Catherine

    2014-10-01

    One important debate regarding Reducing Emissions from Deforestation and Forest Degradation (REDD+) in developing countries concerns the manner in which its implementation might affect local and indigenous communities. New ways to implement this mechanism without harming the interests of local communities are emerging. To inform this debate, we conducted a qualitative research synthesis to identify best practices (BPs) from people-centered approaches to conservation and rural development, developed indicators of BPs, and invited development practitioners and researchers in the field to assess how the identified BPs are being adopted by community-level REDD+ projects in Latin America. BPs included: local participation in all phases of the project; project supported by a decentralized forest governance framework; project objectives matching community livelihood priorities; project addressing community development needs and expectations; project enhancing stakeholder collaboration and consensus building; project applying an adaptive management approach; and project developing national and local capacities. Most of the BPs were part of the evaluated projects. However, limitations of some of the projects related to decentralized forest governance, matching project objectives with community livelihood priorities, and addressing community development needs. Adaptive management and free and prior informed consent have been largely overlooked. These limitations could be addressed by integrating conservation outcomes and alternative livelihoods into longer-term community development goals, testing nested forest governance approaches in which national policies support local institutions for forest management, gaining a better understanding of the factors that will make REDD+ more acceptable to local communities, and applying an adaptive management approach that allows for social learning and capacity building of relevant stakeholders. Our study provides a framework of BPs and indicators that could be used by stakeholders to improve REDD+ project design, monitoring, and evaluation, which may help reconcile national initiatives and local interests without reinventing the wheel. © 2014 Society for Conservation Biology.

  4. The PI-Mode of Project Management

    NASA Technical Reports Server (NTRS)

    Isaac, Dan

    1997-01-01

    The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.

  5. Advancing the practice of systems engineering at JPL

    NASA Technical Reports Server (NTRS)

    Jansma, Patti A.; Jones, Ross M.

    2006-01-01

    In FY 2004, JPL launched an initiative to improve the way it practices systems engineering. The Lab's senior management formed the Systems Engineering Advancement (SEA) Project in order to "significantly advance the practice and organizational capabilities of systems engineering at JPL on flight projects and ground support tasks." The scope of the SEA Project includes the systems engineering work performed in all three dimensions of a program, project, or task: 1. the full life-cycle, i.e., concept through end of operations 2. the full depth, i.e., Program, Project, System, Subsystem, Element (SE Levels 1 to 5) 3. the full technical scope, e.g., the flight, ground and launch systems, avionics, power, propulsion, telecommunications, thermal, etc. The initial focus of their efforts defined the following basic systems engineering functions at JPL: systems architecture, requirements management, interface definition, technical resource management, system design and analysis, system verification and validation, risk management, technical peer reviews, design process management and systems engineering task management, They also developed a list of highly valued personal behaviors of systems engineers, and are working to inculcate those behaviors into members of their systems engineering community. The SEA Project is developing products, services, and training to support managers and practitioners throughout the entire system lifecycle. As these are developed, each one needs to be systematically deployed. Hence, the SEA Project developed a deployment process that includes four aspects: infrastructure and operations, communication and outreach, education and training, and consulting support. In addition, the SEA Project has taken a proactive approach to organizational change management and customer relationship management - both concepts and approaches not usually invoked in an engineering environment. This paper'3 describes JPL's approach to advancing the practice of systems engineering at the Lab. It describes the general approach used and how they addressed the three key aspects of change: people, process and technology. It highlights a list of highly valued personal behaviors of systems engineers, discusses the various products, services and training that were developed, describes the deployment approach used, and concludes with several lessons learned.

  6. Development of GPS survey data management protocols/policy.

    DOT National Transportation Integrated Search

    2010-08-01

    This project developed a statewide policy and criteria for collecting, analyzing, and managing global position system (GPS) survey data. The research project determined the needs of the Department in adopting the GPS real time kinetic (GPS RTK) stake...

  7. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. Development of a requirements management system for technical decision - making processes in the geological disposal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama

    2007-07-01

    NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less

  9. Software Management Environment (SME): Components and algorithms

    NASA Technical Reports Server (NTRS)

    Hendrick, Robert; Kistler, David; Valett, Jon

    1994-01-01

    This document presents the components and algorithms of the Software Management Environment (SME), a management tool developed for the Software Engineering Branch (Code 552) of the Flight Dynamics Division (FDD) of the Goddard Space Flight Center (GSFC). The SME provides an integrated set of visually oriented experienced-based tools that can assist software development managers in managing and planning software development projects. This document describes and illustrates the analysis functions that underlie the SME's project monitoring, estimation, and planning tools. 'SME Components and Algorithms' is a companion reference to 'SME Concepts and Architecture' and 'Software Engineering Laboratory (SEL) Relationships, Models, and Management Rules.'

  10. NASA Advanced Life Support Technology Testing and Development

    NASA Technical Reports Server (NTRS)

    Wheeler, Raymond M.

    2012-01-01

    Prior to 2010, NASA's advanced life support research and development was carried out primarily under the Exploration Life Support Project of NASA's Exploration Systems Mission Directorate. In 2011, the Exploration Life Support Project was merged with other projects covering Fire Prevention/Suppression, Radiation Protection, Advanced Environmental Monitoring and Control, and Thermal Control Systems. This consolidated project was called Life Support and Habitation Systems, which was managed under the Exploration Systems Mission Directorate. In 2012, NASA re-organized major directorates within the agency, which eliminated the Exploration Systems Mission Directorate and created the Office of the Chief Technologist (OCT). Life support research and development is currently conducted within the Office of the Chief Technologist, under the Next Generation Life Support Project, and within the Human Exploration Operation Missions Directorate under several Advanced Exploration System projects. These Advanced Exploration Systems projects include various themes of life support technology testing, including atmospheric management, water management, logistics and waste management, and habitation systems. Food crop testing is currently conducted as part of the Deep Space Habitation (DSH) project within the Advanced Exploration Systems Program. This testing is focused on growing salad crops that could supplement the crew's diet during near term missions.

  11. Teaching, Doing, and Sharing Project Management in a Studio Environment: The Development of an Instructional Design Open-Source Project Management Textbook

    ERIC Educational Resources Information Center

    Randall, Daniel L.; Johnson, Jacquelyn C.; West, Richard E.; Wiley, David A.

    2013-01-01

    In this article, the authors present an example of a project-based course within a studio environment that taught collaborative innovation skills and produced an open-source project management textbook for the field of instructional design and technology. While innovation plays an important role in our economy, and many have studied how to teach…

  12. LHCb migration from Subversion to Git

    NASA Astrophysics Data System (ADS)

    Clemencic, M.; Couturier, B.; Closier, J.; Cattaneo, M.

    2017-10-01

    Due to user demand and to support new development workflows based on code review and multiple development streams, LHCb decided to port the source code management from Subversion to Git, using the CERN GitLab hosting service. Although tools exist for this kind of migration, LHCb specificities and development models required careful planning of the migration, development of migration tools, changes to the development model, and redefinition of the release procedures. Moreover we had to support a hybrid situation with some software projects hosted in Git and others still in Subversion, or even branches of one projects hosted in different systems. We present the way we addressed the special LHCb requirements, the technical details of migrating large non standard Subversion repositories, and how we managed to smoothly migrate the software projects following the schedule of each project manager.

  13. Managing the Podcast Lecture: A Hybrid Approach for Online Lectures in the Business Classroom

    ERIC Educational Resources Information Center

    Hollandsworth, Randall J.

    2007-01-01

    This article discusses a pilot project applying podcast technology to a management course. The project was designed, implemented, and evaluated in spring 2006 in conjunction with the Management and Supervisory Development program at Athens Technical College (Athens, Georgia). The project goals were to evaluate the pedagogical, logistical, and…

  14. Continuous Risk Management: An Overview

    NASA Technical Reports Server (NTRS)

    Rosenberg, Linda; Hammer, Theodore F.

    1999-01-01

    Software risk management is important because it helps avoid disasters, rework, and overkill, but more importantly because it stimulates win-win situations. The objectives of software risk management are to identify, address, and eliminate software risk items before they become threats to success or major sources of rework. In general, good project managers are also good managers of risk. It makes good business sense for all software development projects to incorporate risk management as part of project management. The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to implement risk management. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This is an introductory tutorial to continuous risk management based on this course. The rational for continuous risk management and how it is incorporated into project management are discussed. The risk management structure of six functions is discussed in sufficient depth for managers to understand what is involved in risk management and how it is implemented. These functions include: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  15. A critical review of the life sciences project management at Ames Research Center for the Spacelab Mission development test 3

    NASA Technical Reports Server (NTRS)

    Helmreich, R. L.; Wilhelm, J. M.; Tanner, T. A.; Sieber, J. E.; Burgenbauch, S. F.

    1979-01-01

    A management study was initiated by ARC (Ames Research Center) to specify Spacelab Mission Development Test 3 activities and problems. This report documents the problems encountered and provides conclusions and recommendations to project management for current and future ARC life sciences projects. An executive summary of the conclusions and recommendations is provided. The report also addresses broader issues relevant to the conduct of future scientific missions under the constraints imposed by the space environment.

  16. Preparing the Production of a New Product in Small and Medium-Sized Enterprises by Using the Method of Projects Management

    NASA Astrophysics Data System (ADS)

    Bijańska, Jolanta; Wodarski, Krzysztof; Wójcik, Janusz

    2016-06-01

    Efficient and effective preparation the production of new products is important requirement for a functioning and development of small and medium-sized enterprises. One of the methods, which support the fulfilment of this condition is project management. This publication presents the results of considerations, which are aimed at developing a project management model of preparation the production of a new product, adopted to specificity of small and medium-sized enterprises.

  17. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  18. LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noonan, Christine F.; Henry, Michael J.; Corley, Courtney D.

    2014-01-14

    The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this documentmore » to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.« less

  19. Project-Based Management Development: "The Volvo Story."

    ERIC Educational Resources Information Center

    Branch, John; Smith, Bryan

    1992-01-01

    A modular group project-based approach to management development was implemented by Volvo Concessionaires (United Kingdom) in partnership with training consultants. Ingredients of its success included top-level commitment, investment in diagnosis and tailoring, and use of company-specific case studies. (SK)

  20. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  1. Fast Track Study

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The NASA Fast Track Study supports the efforts of a Special Study Group (SSG) made up of members of the Advanced Project Management Class number 23 (APM-23) that met at the Wallops Island Management Education Center from April 28 - May 8, 1996. Members of the Class expressed interest to Mr. Vem Weyers in having an input to the NASA Policy Document (NPD) 7120.4, that will replace NASA Management Institute (NMI) 7120.4, and the NASA Program/Project Management Guide. The APM-23 SSG was tasked with assisting in development of NASA policy on managing Fast Track Projects, defined as small projects under $150 million and completed within three years. 'Me approach of the APM-23 SSG was to gather data on successful projects working in a 'Better, Faster, Cheaper' environment, within and outside of NASA and develop the Fast Track Project section of the NASA Program/Project Management Guide. Fourteen interviews and four other data gathering efforts were conducted by the SSG, and 16 were conducted by Strategic Resources, Inc. (SRI), including five interviews at the Jet Propulsion Laboratory (JPL) and one at the Applied Physics Laboratory (APL). The interviews were compiled and analyzed for techniques and approaches commonly used to meet severe cost and schedule constraints.

  2. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  3. 33 CFR 385.21 - Quality control.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... will be produced by a Project Delivery Team. The quality control plan shall be included in the Project Management Plan and shall describe the procedures to be used to ensure compliance with technical and policy requirements during implementation. (b) During development of the Project Management Plan for each project, the...

  4. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  5. Managing Small Spacecraft Projects: Less is Not Easier

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  6. Implementing Extreme Programming in Distributed Software Project Teams: Strategies and Challenges

    NASA Astrophysics Data System (ADS)

    Maruping, Likoebe M.

    Agile software development methods and distributed forms of organizing teamwork are two team process innovations that are gaining prominence in today's demanding software development environment. Individually, each of these innovations has yielded gains in the practice of software development. Agile methods have enabled software project teams to meet the challenges of an ever turbulent business environment through enhanced flexibility and responsiveness to emergent customer needs. Distributed software project teams have enabled organizations to access highly specialized expertise across geographic locations. Although much progress has been made in understanding how to more effectively manage agile development teams and how to manage distributed software development teams, managers have little guidance on how to leverage these two potent innovations in combination. In this chapter, I outline some of the strategies and challenges associated with implementing agile methods in distributed software project teams. These are discussed in the context of a study of a large-scale software project in the United States that lasted four months.

  7. "Green-friendly" best management practices (BMPs) for interstate rest areas.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the findings of a research project to study and develop a list of green friendly Best : Management Practices (BMPs) for Illinois interstate rest areas. The objectives of this project are to (1) develop : energy and cost bas...

  8. Research review for information management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.

    1988-01-01

    The goal of RICIS research in information management is to apply currently available technology to existing problems in information management. Research projects include the following: the Space Business Research Center (SBRC), the Management Information and Decision Support Environment (MIDSE), and the investigation of visual interface technology. Several additional projects issued reports. New projects include the following: (1) the AdaNET project to develop a technology transfer network for software engineering and the Ada programming language; and (2) work on designing a communication system for the Space Station Project Office at JSC. The central aim of all projects is to use information technology to help people work more productively.

  9. An Instructional Feedback Technique for Teaching Project Management Tools Aligned with PMBOK

    ERIC Educational Resources Information Center

    Gonçalves, Rafael Queiroz; von Wangenheim, Christiane Gresse; Hauck, Jean Carlo Rossa; Petri, Giani

    2017-01-01

    The management of contemporary software projects is unfeasible without the support of a Project Management (PM) tool. In order to enable the adoption of PM tools in practice, teaching its usage is important as part of computer education. Aiming at teaching PM tools, several approaches have been proposed, such as the development of educational PM…

  10. The Administration of Sponsored Programs. Handbook for Developing and Managing Research Activities and Other Projects.

    ERIC Educational Resources Information Center

    Beasley, Kenneth L.; And Others

    Designed as a standard reference and training resource for administrators and project managers, this handbook discusses how to plan, organize, and manage sponsored projects in any organizational setting. It provides detailed, how-to-do-it information and many resources for: negotiating grants, awards, and contracts; organizing a sponsored projects…

  11. Building Project Management Communities: Exploring the Contribution of Patterns Supported by Web 2.0 Technologies

    ERIC Educational Resources Information Center

    Burd, Elizabeth L.; Hatch, Andrew; Ashurst, Colin; Jessop, Alan

    2009-01-01

    This article describes an approach whereby patterns are used to describe management issues and solutions to be used during the project management of team-based software development. The work describes how web 2.0 technologies have been employed to support the use and development of such patterns. To evaluate the success of patterns and the…

  12. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  13. Guidelines for the development of a Project Data Management Plan (PDMP)

    NASA Technical Reports Server (NTRS)

    Green, James L.; King, Joseph H.

    1988-01-01

    The purpose of this document is to assist NASA Project personnel in the preparation of their Project Data Management Plans (PDMP) in accordance with NASA Management Instruction (NMI) 8030.3A. In addition, this report summarizes the scope of a PDMP and establishes important aspects that must be addressed for the long term management and archiving of the data from a NASA space flight investigation.

  14. Application of Project Portfolio Management

    NASA Astrophysics Data System (ADS)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  15. The science of laboratory and project management in regulated bioanalysis.

    PubMed

    Unger, Steve; Lloyd, Thomas; Tan, Melvin; Hou, Jingguo; Wells, Edward

    2014-05-01

    Pharmaceutical drug development is a complex and lengthy process, requiring excellent project and laboratory management skills. Bioanalysis anchors drug safety and efficacy with systemic and site of action exposures. Development of scientific talent and a willingness to innovate or adopt new technology is essential. Taking unnecessary risks, however, should be avoided. Scientists must strategically assess all risks and find means to minimize or negate them. Laboratory Managers must keep abreast of ever-changing technology. Investments in instrumentation and laboratory design are critical catalysts to efficiency and safety. Matrix management requires regular communication between Project Managers and Laboratory Managers. When properly executed, it aligns the best resources at the right times for a successful outcome. Attention to detail is a critical aspect that separates excellent laboratories. Each assay is unique and requires attention in its development, validation and execution. Methods, training and facilities are the foundation of a bioanalytical laboratory.

  16. Microgrid Controls | Grid Modernization | NREL

    Science.gov Websites

    Systems Integration Facility. Microgrid Controller Interaction with Distribution Management Systems This project investigates the interaction of distribution management systems with local controllers, including microgrid controllers. The project is developing integrated control and management systems for distribution

  17. Let your fingers do the walking: The projects most invaluable tool

    NASA Technical Reports Server (NTRS)

    Zirk, Deborah A.

    1993-01-01

    The barrage of information pertaining to the software being developed for a project can be overwhelming. Current status information, as well as the statistics and history of software releases, should be 'at the fingertips' of project management and key technical personnel. This paper discusses the development, configuration, capabilities, and operation of a relational database, the System Engineering Database (SEDB) which was designed to assist management in monitoring of the tasks performed by the Network Control Center (NCC) Project. This database has proven to be an invaluable project tool and is utilized daily to support all project personnel.

  18. Management Guidelines for Database Developers' Teams in Software Development Projects

    NASA Astrophysics Data System (ADS)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  19. Rainwater Wildlife Area, Watershed Management Plan, A Columbia Basin Wildlife Mitigation Project, 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen B.

    This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less

  20. Adaptive Knowledge Management of Project-Based Learning

    ERIC Educational Resources Information Center

    Tilchin, Oleg; Kittany, Mohamed

    2016-01-01

    The goal of an approach to Adaptive Knowledge Management (AKM) of project-based learning (PBL) is to intensify subject study through guiding, inducing, and facilitating development knowledge, accountability skills, and collaborative skills of students. Knowledge development is attained by knowledge acquisition, knowledge sharing, and knowledge…

  1. Projecting manpower to attain quality

    NASA Technical Reports Server (NTRS)

    Rone, K. Y.

    1983-01-01

    The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.

  2. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or..., 1983 and (2) apply generally to rental housing projects not assisted under the Housing Development...

  3. 24 CFR 850.153 - Rent control.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.153 Rent control. A project constructed or..., 1983 and (2) apply generally to rental housing projects not assisted under the Housing Development...

  4. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  5. VA Construction: Improved Processes Needed to Monitor Contract Modifications, Develop Schedules, and Estimate Costs

    DTIC Science & Technology

    2017-03-01

    address challenges in managing projects to build medical facilities. In response to statutory requirements and additional congressional direction, VA...is outsourcing management of certain such projects to the U.S. Army Corps of Engineers (USACE). As of October 2016, VA had 23 ongoing projects...costing $100 million or more. VA and USACE have entered into interagency agreements for 12 of these 23 projects. The agreements entail USACE’s managing

  6. Communication Scaffolds for Project Management in PBL

    ERIC Educational Resources Information Center

    Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi

    2017-01-01

    In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…

  7. The Application of Project Management Techniques to College and University Admissions Activities.

    ERIC Educational Resources Information Center

    Bickers, Doyle

    1993-01-01

    The process of project management is illustrated through application to one activity, development of a new brochure, within the admissions program of a fictional college. The project life cycle is described, and a work responsibility schedule, project completion schedule, and critical path chart are used as planning and implementation tools. (MSE)

  8. Managed lanes handbook training : year 2 report of activities.

    DOT National Transportation Integrated Search

    2009-02-01

    This report summarizes the Year 2 activities under Implementation Project 5-4160-01, Managed Lanes : Handbook Training. The overall objective of the project is to develop a 12-hour workshop covering The : Managed Lanes Handbook, and teach the materia...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less

  10. How to handle multidisciplinary, multi-national and multi-sectoral projects

    NASA Astrophysics Data System (ADS)

    Reitz, Anja; Wallmann, Klaus; Visbeck, Martin

    2016-04-01

    Collaborative research projects funded by the European Commission are by nature multi-national. Often they bring together different scientific communities as the questions raised in EU project calls can typically only be addressed through the convergence of these previously separated disciplines in one research consortium. Some work programmes even necessitate to team up as different disciplines as natural sciences, social science, legal science and economic science. Examples for such multi- national, -disciplinary and - sectoral projects are the EU projects ECO2 (FP7, concluded) and AtlantOS (H2020). Project managers of such projects need to develop skills beyond the common technical and management skills namely go into the domain of partners and stakeholders psychology and be able to maintain different perspectives on communication and interaction needs regarding cultural-, discipline- and sectoral background. Accordingly, the project manager has besides his technical role as manager at least three further roles: that of a communicator, that of a mediator and that of a person convincing partners of the necessary and selling the project products to the stakeholders. As the typical project manager has not too much power and authority by his position he has to use the power of smart communication and persuasion to overcome potential dissension between disciplines, national reservation or potential conflicts regarding different sectoral views. Accordingly, the project manager of such a complex project would try to arrange the ideal working environment by considering cultural feel, the cooperation of disciplines, information and the control of resources. The way he develops such ideal working environment is by reflection of past, present and future experiences/needs.

  11. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    NASA Astrophysics Data System (ADS)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  12. Achieving Management Skills. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    Prepared as part of Platte Technical Community College's project to help managers and supervisors develop practical, up-to-date managerial skills in a relatively short time, this instructional workbook provides information and exercises applicable to on-the-job situations. Unit I focuses on time management, the causes and management of stress, and…

  13. NASA's Cryogenic Fluid Management Technology Project

    NASA Technical Reports Server (NTRS)

    Tramel, Terri L.; Motil, Susan M.

    2008-01-01

    The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.

  14. 76 FR 45543 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the Skagit River General...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-29

    ... proposed flood-risk management project in the Skagit River Basin from Ross Dam to the river mouth at Skagit... share of the project costs. This is a single-purpose flood-risk management study. The goal of this project is to identify the National Economic Development (NED) plan, the flood-risk management alternative...

  15. Improving the coordination of patients' medication management: a regional Finnish development project.

    PubMed

    Kivekäs, Eija; Luukkonen, Irmeli; Mykkänen, Juha; Saranto, Kaija

    2014-01-01

    In this paper, we present an overview of activities and results from a regional development project in Finland. The aim in this project was to analyze how healthcare providers produce and receive information on a patient's medication, and to identify opportunities to improve the quality, effectiveness, availability and collaboration of social and healthcare services in relation to medication information. The project focused on the most important points in patients' medication management such as home care and care transitions. In a regional development project, data was gathered by interviews and a multi professional workshop. The study revealed that medication information reached only some professionals and lay caregivers despite electronic patient record (EPR) systems and tools. Differences in work processes related to medication reconciliation and information management were discussed in the group meeting and were regarded as a considerable risk for patient safety.

  16. Some thoughts on the management of large, complex international space ventures

    NASA Technical Reports Server (NTRS)

    Lee, T. J.; Kutzer, Ants; Schneider, W. C.

    1992-01-01

    Management issues relevant to the development and deployment of large international space ventures are discussed with particular attention given to previous experience. Management approaches utilized in the past are labeled as either simple or complex, and signs of efficient management are examined. Simple approaches include those in which experiments and subsystems are developed for integration into spacecraft, and the Apollo-Soyuz Test Project is given as an example of a simple multinational approach. Complex approaches include those for ESA's Spacelab Project and the Space Station Freedom in which functional interfaces cross agency and political boundaries. It is concluded that individual elements of space programs should be managed by individual participating agencies, and overall configuration control is coordinated by level with a program director acting to manage overall objectives and project interfaces.

  17. 0-6683 : develop a pavement project evaluation index to support the 4-year pavement management plan.

    DOT National Transportation Integrated Search

    2013-08-01

    A pavement management plan (PMP) identifies : candidate maintenance and rehabilitation (M&R) : projects for a particular roadway network over a : multi-year planning period. The PMP is a living : document because projects are reevaluated and : reprio...

  18. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  19. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  20. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project restrictions. 850.151... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  1. Scalable collaborative risk management technology for complex critical systems

    NASA Technical Reports Server (NTRS)

    Campbell, Scott; Torgerson, Leigh; Burleigh, Scott; Feather, Martin S.; Kiper, James D.

    2004-01-01

    We describe here our project and plans to develop methods, software tools, and infrastructure tools to address challenges relating to geographically distributed software development. Specifically, this work is creating an infrastructure that supports applications working over distributed geographical and organizational domains and is using this infrastructure to develop a tool that supports project development using risk management and analysis techniques where the participants are not collocated.

  2. The Course Development Plan: Macro-Level Decisions and Micro-Level Processes

    ERIC Educational Resources Information Center

    Franker, Karen; James, Dennis

    2016-01-01

    A key step in distance learning project management is the creation of a course development plan. The plan should account for decisions related to materials, curriculum, delivery methods, staffing, technology applications, resources, reporting lines, and project management--issues that may require administrator involvement and support, particularly…

  3. Archiving a Software Development Project

    DTIC Science & Technology

    2013-04-01

    an ongoing monitoring system that identifies attempts and requests for retrieval, and ensures that the attempts and requests cannot proceed without...Intelligence Division Peter Fisher has worked as a consultant, systems analyst, software developer and project manager in Australia, Holland, the USA...4 3.1.3 DRMS – Defence Records Management System

  4. Bringing Knowledge Management into an Engineering Curriculum

    ERIC Educational Resources Information Center

    Winberg, S. L.; Schach, S. R.; Inggs, M. R.

    2007-01-01

    The use of effective knowledge management is becoming an essential part of technical development projects in order to enable developers to handle the growing complexity of these projects. In this article we discuss an innovative approach to address this concern from the perspective of an undergraduate engineering curriculum. Instead of adding…

  5. Leveraging Independent Management and Chief Engineer Hierarchy: Vertically and Horizontally-Derived Technical Authority Value

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    In the development of complex spacecraft missions, project management authority is usually extended hierarchically from NASA's highest agency levels down to the implementing institution's project team level, through both the center and the program. In parallel with management authority, NASA utilizes a complementary, but independent, hierarchy of technical authority (TA) that extends from the agency level to the project, again, through both the center and the program. The chief engineers (CEs) who serve in this technical authority capacity oversee and report on the technical status and ensure sound engineering practices, controls, and management of the projects and programs. At the lowest level, implementing institutions assign project CEs to technically engage projects, lead development teams, and ensure sound technical principles, processes, and issue resolution. At the middle level, programs and centers independently use CEs to ensure the technical success of their projects and programs. At the agency level, NASA's mission directorate CEs maintain technical cognizance over every program and project in their directorate and advise directorate management on the technical, cost, schedule, and programmatic health of each. As part of this vertically-extended CE team, a program level CE manages a continually varying balance between penetration depth and breadth across his or her assigned missions. Teamwork issues and information integration become critical for management at all levels to ensure value-added use of both the synergy available between CEs at the various agency levels, and the independence of the technical authority at each organization.

  6. ASK Magazine. No. 14

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    Academy of Program and Project Leadership (APPL) and ASK Magazine helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners, and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the best of the best project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects - they're all here in ASK. Please direct all inquiries about ASK Magazine editorial policy to Todd Post, EduTech Ltd., 8455 Colesville Rd., Suite 930, Silver Spring, MD 20910, (301) 585-1030; or email to tpost@edutechltd.com.

  7. The LANDFIRE Prototype Project: nationally consistent and locally relevant geospatial data for wildland fire management

    Treesearch

    Matthew G. Rollins; Christine K. Frame

    2006-01-01

    The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, began in April of 2002 and ended in April of 2005. The project was funded by the U.S. Department of Agriculture Forest Service and U.S. Department of the Interior. The objectives of the LANDFIRE Prototype Project were to develop the methods, tools, and protocols...

  8. Arctic Energy Technology Development Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sukumar Bandopadhyay; Charles Chamberlin; Robert Chaney

    2008-12-31

    The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. Inmore » the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.« less

  9. The scientific foundation of the LANDFIRE Prototype Project [Chapter 3

    Treesearch

    Robert E. Keane; Matthew Rollins

    2006-01-01

    The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, originated from a recent mapping project that developed a set of coarse-scale spatial data layers for wildland fire management describing fire hazard and ecological status for the conterminous United States (Hardy and others 2001; Schmidt and others 2002; www. fs...

  10. Climate project screening tool: an aid for climate change adaptation

    Treesearch

    Toni Lyn Morelli; Sharon Yeh; Nikola M. Smith; Mary Beth Hennessy; Constance I. Millar

    2012-01-01

    To address the impacts of climate change, land managers need techniques for incorporating adaptation into ongoing or impending projects. We present a new tool, the Climate Project Screening Tool (CPST), for integrating climate change considerations into project planning as well as for developing concrete adaptation options for land managers. We designed CPST as part of...

  11. Education Projects: Elaboration, Financing and Management. Fundamentals of Educational Planning, No. 38.

    ERIC Educational Resources Information Center

    Magnen, Andre

    In many developing countries, the translation of political objectives to action projects is made difficult by the lack of training of staff of the ministry of education planning and managing units. This booklet deals with the implementation of these projects within the framework of the planning process. After defining projects, chapter 1 shows the…

  12. Integration and Test of Shuttle Small Payloads

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.

    2003-01-01

    Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

  13. Change management methodologies trained for automotive infotainment projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Volker, S.; Hutanu, A.

    2017-01-01

    An Automotive Electronic Control Units (ECU) development project embedded within a car Environment is constantly under attack of a continuous flow of modifications of specifications throughout the life cycle. Root causes for those modifications are for instance simply software or hardware implementation errors or requirement changes to satisfy the forthcoming demands of the market to ensure the later commercial success. It is unavoidable that from the very beginning until the end of the project “requirement changes” will “expose” the agreed objectives defined by contract specifications, which are product features, budget, schedule and quality. The key discussions will focus upon an automotive radio-navigation (infotainment) unit, which challenges aftermarket devises such as smart phones. This competition stresses especially current used automotive development processes, which are fit into a 4 Year car development (introduction) cycle against a one-year update cycle of a smart phone. The research will focus the investigation of possible impacts of changes during all phases of the project: the Concept-Validation, Development and Debugging-Phase. Building a thorough understanding of prospective threats is of paramount importance in order to establish the adequate project management process to handle requirement changes. Personal automotive development experiences and Literature review of change- and configuration management software development methodologies led the authors to new conceptual models, which integrates into the structure of traditional development models used in automotive projects, more concretely of radio-navigation projects.

  14. Software Program: Software Management Guidebook

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The purpose of this NASA Software Management Guidebook is twofold. First, this document defines the core products and activities required of NASA software projects. It defines life-cycle models and activity-related methods but acknowledges that no single life-cycle model is appropriate for all NASA software projects. It also acknowledges that the appropriate method for accomplishing a required activity depends on characteristics of the software project. Second, this guidebook provides specific guidance to software project managers and team leaders in selecting appropriate life cycles and methods to develop a tailored plan for a software engineering project.

  15. Defense AT and L Magazine. Vol. 46, no. 4, July-August 2017

    DTIC Science & Technology

    2017-07-01

    engineering. He also is a certified Project Manage - ment Professional. Supply Chain Management SCM has become a vital tool used in today’s global economy to...modifying the project management dashboards originally developed by one of the authors, described in “Leveraging Fidelity of Performance­Based Metric...Tools for Project Man­ agement,” an article in the January­February 2003 issue of Program Manager , the predecessor of Defense AT&L magazine

  16. Task Management for Firefighters: A Practical Approach to Task Management.

    ERIC Educational Resources Information Center

    Roberts, Stephen S.

    1979-01-01

    A project management system for organizing requests from multiple departments and controlling the workload of the development/maintenance computer staff is described. Practical solutions to deciding project priorities, determining time estimates, creating positive peer pressure among programing staff, and formalizing information requests are…

  17. The corporate impact of addressing social issues: a financial case study of a project in Peru.

    PubMed

    Dabbs, Alan; Bateson, Matthew

    2002-05-01

    Large, multinational resource development projects can affect many aspects, including social, economic and ecological realities, in the regions where they operate. Social and environmental issues that are usually ignored in such projects are increasingly affecting the financial future of multinational corporations in negative ways. In this article, we advance the argument that corporations can successfully manage these issues and that if they choose to view these management efforts as an investment rather than an expense, they may well acquire a competitive advantage over companies that do not. We describe as a case study the Camisea natural gas and condensates development project in Peru, operated by Shell Prospecting and Development Peru (SPDP). Camisea is one of the first projects anywhere in the world to conduct a detailed analysis of key industry-related social issues and the processes, required investment and financial impact of managing them. The Camisea example supports the argument that addressing social and environmental concerns makes financial sense. In present value terms, the benefit of managing these concerns was expected to surpass the cost investment by approximately US$50 million.

  18. Research Results and Final Report for the Dispute Management in the Schools Project. PCR Working Paper Series.

    ERIC Educational Resources Information Center

    Araki, Charles T.; And Others

    To develop and test an experimental model of dispute or conflict management through mediation in a school complex, and to examine the basic nature of conflict in schools, the Dispute Management in the Schools Project (DMSP) was conducted. The 3-year mediation project, begun in January 1986, involved an elementary school, an intermediate school, a…

  19. ASK Magazine. No. 12

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    Welcome to the Academy of Program and Project Leadership (APPL) and ASK Magazine. APPL helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, smaLl projects-they're ali here in ASK. Stories in this issue include: Earthly Considerations on Mars, Getting Politically Active, Stumping for the Project, Grins & Giggles: The Launch Pad to High Performance, Transfer Wisdom Workshops: Coming to a NASA Center Near You, Project Management: The Television Show, Lessons Learned Again and Again and Again, Implementation Reviews, ASK Talks with Dr. Michael Hecht, and What Is This Fourth Dimension?.

  20. [Consequences of a Failed Project: Introduction and Management of a Hospitalization-Substituting Treatment Model].

    PubMed

    Peters, Uwe

    2018-01-01

    This article is a report on a psychiatric project introducing services that substitute in-patient treatment and a new control and management system. The implementation of the project was a failure. Nevertheless, the project has made a contribution to further development of community-based psychiatry. Design, organization and course of the project are described and analyzed from the point of view of the communal actors involved. Effects going beyond the time course of the project have been taken into consideration. The results show that the contracting authority, project developer and local actors involved had differing ideas on the weight attached to different parts of the project as well as on the project goal and resources for carrying out the project. © Georg Thieme Verlag KG Stuttgart · New York.

  1. Application of ESE Data and Tools to Air Quality Management: Services for Helping the Air Quality Community use ESE Data (SHAirED)

    NASA Technical Reports Server (NTRS)

    Falke, Stefan; Husar, Rudolf

    2011-01-01

    The goal of this REASoN applications and technology project is to deliver and use Earth Science Enterprise (ESE) data and tools in support of air quality management. Its scope falls within the domain of air quality management and aims to develop a federated air quality information sharing network that includes data from NASA, EPA, US States and others. Project goals were achieved through a access of satellite and ground observation data, web services information technology, interoperability standards, and air quality community collaboration. In contributing to a network of NASA ESE data in support of particulate air quality management, the project will develop access to distributed data, build Web infrastructure, and create tools for data processing and analysis. The key technologies used in the project include emerging web services for developing self describing and modular data access and processing tools, and service oriented architecture for chaining web services together to assemble customized air quality management applications. The technology and tools required for this project were developed within DataFed.net, a shared infrastructure that supports collaborative atmospheric data sharing and processing web services. Much of the collaboration was facilitated through community interactions through the Federation of Earth Science Information Partners (ESIP) Air Quality Workgroup. The main activities during the project that successfully advanced DataFed, enabled air quality applications and established community-oriented infrastructures were: develop access to distributed data (surface and satellite), build Web infrastructure to support data access, processing and analysis create tools for data processing and analysis foster air quality community collaboration and interoperability.

  2. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    PubMed

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served as travel guides, assisting and overseeing the programs as they traveled from the global plans to local actions. Project leaders, while hypothetically in control of the programs, in fact shared control of the traveling of the programs with patients, clinicians, and outside consultants. From this work, we can learn what roadblocks and expenses occur while a technology travels, from a project leader's point of view.

  3. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  4. Marine and Hydrokinetic Technology Development Risk Management Framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snowberg, David; Weber, Jochem

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over themore » development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.« less

  5. [Development of an instrument for the assessment of demand and monitoring of the health management in a health insurance].

    PubMed

    Burnus, M; Benner, V; Becker, L; Müller, D; Stock, S

    2014-06-01

    To identify and follow up the health relevant effects of change-management-projects and to determine improvements in activities following this change a specific health-controlling instrument with benchmarking options has been developed. This instrument applies scientific quality standards and shows the organisational value in form of an index (BGM-Systemindex). It shows the correlation between the four indices management system, health-related actions, health and absence rate and allows a qualitative view of corporate health promotion on and its long term effects. The initiator for the project was an employee survey, which showed a need for action to improve job satisfaction. The survey was the reason that management initiated an integral change-management-project. The project showed many interfaces with the corporate health promotion (BGM), thus enabling consequent changes to be made and their effects to be evaluated. The aim of the project was to clearly increase employee satisfaction up to the next employee survey. Overall the project can be considered a success as the main aim of the project to increase the employees job satisfaction in the given period of time was clearly accomplished. The BGM-Systemindex also stood the test for comprehensive monitoring of the employees health. The project was able to prove that the health relevant parameters could be optimised and that the quality, acceptance and efficiency of the intervention methods had improved. It also showed a positive development of the early and long term health indicators. This is a positive contrast to available literature, which shows that an insufficient or incorrectly used change management results in a lower employee satisfaction. As a result it was decided to use the tool in future.

  6. Scientific data bases on a VAX-11/780 running VMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benkovitz, C.M.; Tichler, J.L.

    At Brookhaven National Laboratory several current projects are developing and applying data management techniques to compile, analyze and distribute scientific data sets that are the result of various multi institutional experiments and data gathering projects. This paper will present an overview of a few of these data management projects.

  7. Surgery and Research: A Practical Approach to Managing the Research Process

    PubMed Central

    Swiatek, Peter R.; Chung, Kevin C.; Mahmoudi, Elham

    2016-01-01

    Following a practical project management method is essential in completing a research project on time and within budget. Although this concept is well developed in the business world, it has yet to be explored in academic surgical research. Defining and adhering to a suitable workflow would increase portability, reusability, and therefore, efficiency of the research process. In this article, we briefly review project management techniques. We specifically underline four main steps of project management: (1) definition and organization, (2) planning, (3) execution, and (4) evaluation, using practical examples from our own multidisciplinary plastic surgery research team. PMID:26710037

  8. Fleet management performance monitoring.

    DOT National Transportation Integrated Search

    2013-05-01

    The principle goal of this project was to enhance and expand the analytical modeling methodology previously developed as part of the Fleet Management Criteria: Disposal Points and Utilization Rates project completed in 2010. The enhanced and ex...

  9. [Administration of the "Healthy School" project].

    PubMed

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management, the level of personal influence on different aspects of Project development and overall work motivation and satisfaction of all participants. (c) The outcomes of the given management attempts were analyzed by the following output variables: the number of different types of meetings held, the number of seminars, mass media presentation and articles, the amount of money raised and the number of questionnaires administered. Triangular method was used to gather the data: (1) direct observation, (2) four types of questionnaires and (3) project reports and documentation. Four types of specially designed questionnaires were used to examine four groups of participants (Project Coordinators, School Project Managers, Directors and Project Co-operators). The questionnaires were different in the questions concerning examinees' project tasks and types of external communication, while the questions referring to personal characteristics, general features of the project (goals, common jobs, participation in decision making, motivation and satisfaction) were the same for all groups. The average age of the project participants was 45.50 ranging from 25 to 60 years of age. The oldest group was the group of School Directors, while the youngest were School Co-operators. The project has been run mostly by women, while men were predominantly represented in the group of School Directors. The teaching occupation is presented by 61.8%, the rest being health professionals, mostly of preventive orientation. The analysis and classification of participants goals verify that the personal goals of all participants correspond with the main Project goals. Certain groups have also some additional motives which support their successful and affective movement towards the overall Project goals. The largest problem in all groups appear to be in the field of financing the Project activities (Figure 1). (ABSTRACT TRUNCATED)

  10. Business and Industrial Supervisors. Project TEAMS. (Techniques and Education for Achieving Management Skills).

    ERIC Educational Resources Information Center

    Platte Technical Community Coll., Columbus, NE.

    The result of a project to develop short courses to help business and industrial supervisors in developing practical, up-to-date managerial skills, this instructional workbook provides information and exercises applicable to on-the-job situations. Unit I covers the following aspects of management: leadership techniques, problem solving, decision…

  11. Infrastructure management : Project A : developing a framework for prioritizing infrastructure improvements on critical freight corridors; Project B : developing a market based framework for freight infrastructure management.

    DOT National Transportation Integrated Search

    2012-12-01

    Fully operational highways are necessary for efficient freight movements by the trucking industry. Yet, the combination of limited funding and aging infrastructure creates a grim scenario for states, which are dependent upon the economic benefits of ...

  12. Agile informatics: application of agile project management to the development of a personal health application.

    PubMed

    Chung, Jeanhee; Pankey, Evan; Norris, Ryan J

    2007-10-11

    We describe the application of the Agile method-- a short iteration cycle, user responsive, measurable software development approach-- to the project management of a modular personal health record, iHealthSpace, to be deployed to the patients and providers of a large academic primary care practice.

  13. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  14. Agile Methods: Selected DoD Management and Acquisition Concerns

    DTIC Science & Technology

    2011-10-01

    SIDRE Software Intensive Innovative Development and Reengineering/Evolution SLIM Software Lifecycle Management -Estimate SLOC source lines of code...ISBN #0321502752 Coaching Agile Teams Lyssa Adkins ISBN #0321637704 Agile Project Management : Creating Innovative Products – Second Edition Jim...Accessed July 13, 2011. [Highsmith 2009] Highsmith, J. Agile Project Management : Creating Innovative Products, 2nd ed. Addison- Wesley, 2009

  15. Instructional Leadership for Quality Learning: An Assessment of the Impact of the Primary School Management Development Project in Botswana

    ERIC Educational Resources Information Center

    Pansiri, Nkobi Owen

    2008-01-01

    A descriptive study using questionnaires was conducted in 2004 to assess the effectiveness of instructional leadership displayed by primary school management teams following the implementation of the Primary School Management Project in Botswana. Leadership skills, Coordination of instructional activities, management of curriculum and quality of…

  16. FOSS Tools for Research Data Management

    NASA Astrophysics Data System (ADS)

    Stender, Vivien; Jankowski, Cedric; Hammitzsch, Martin; Wächter, Joachim

    2017-04-01

    Established initiatives and organizations, e.g. the Initiative for Scientific Cyberinfrastructures (NSF, 2007) or the European Strategy Forum on Research Infrastructures (ESFRI, 2008), promote and foster the development of sustainable research infrastructures. These infrastructures aim the provision of services supporting scientists to search, visualize and access data, to collaborate and exchange information, as well as to publish data and other results. In this regard, Research Data Management (RDM) gains importance and thus requires the support by appropriate tools integrated in these infrastructures. Different projects provide arbitrary solutions to manage research data. However, within two projects - SUMARIO for land and water management and TERENO for environmental monitoring - solutions to manage research data have been developed based on Free and Open Source Software (FOSS) components. The resulting framework provides essential components for harvesting, storing and documenting research data, as well as for discovering, visualizing and downloading these data on the basis of standardized services stimulated considerably by enhanced data management approaches of Spatial Data Infrastructures (SDI). In order to fully exploit the potentials of these developments for enhancing data management in Geosciences the publication of software components, e.g. via GitHub, is not sufficient. We will use our experience to move these solutions into the cloud e.g. as PaaS or SaaS offerings. Our contribution will present data management solutions for the Geosciences developed in two projects. A sort of construction kit with FOSS components build the backbone for the assembly and implementation of projects specific platforms. Furthermore, an approach is presented to stimulate the reuse of FOSS RDM solutions with cloud concepts. In further projects specific RDM platforms can be set-up much faster, customized to the individual needs and tools can be added during the run-time.

  17. Productivity enhancement planning using participative management concepts

    NASA Technical Reports Server (NTRS)

    White, M. E.; Kukla, J. C.

    1985-01-01

    A productivity enhancement project which used participative management for both planning and implementation is described. The process and results associated with using participative management to plan and implement a computer terminal upgrade project where the computer terminals are used by research and development (R&D) personnel are reported. The upgrade improved the productivity of R&D personnel substantially, and their commitment of the implementation is high. Successful utilization of participative management for this project has laid a foundation for continued style shift toward participation within the organization.

  18. Software-Engineering Process Simulation (SEPS) model

    NASA Technical Reports Server (NTRS)

    Lin, C. Y.; Abdel-Hamid, T.; Sherif, J. S.

    1992-01-01

    The Software Engineering Process Simulation (SEPS) model is described which was developed at JPL. SEPS is a dynamic simulation model of the software project development process. It uses the feedback principles of system dynamics to simulate the dynamic interactions among various software life cycle development activities and management decision making processes. The model is designed to be a planning tool to examine tradeoffs of cost, schedule, and functionality, and to test the implications of different managerial policies on a project's outcome. Furthermore, SEPS will enable software managers to gain a better understanding of the dynamics of software project development and perform postmodern assessments.

  19. National Weather- RFC Development Management

    Science.gov Websites

    Map News Organization Search NWS ALL NOAA Go RFC Development Management Presentations Projects & ; Plans RFC Development Program RFC Archive Database Documentation Outline Workshops Contact Us resources and services. Description Graphic The RFC Development Management component of the Office of

  20. CrossTalk: The Journal of Defense Software Engineering. Volume 21, Number 1

    DTIC Science & Technology

    2008-01-01

    project manage- ment and the individual components of the software life-cycle model ; it will be awarded for...software professionals that had been formally educated in software project manage- ment. The study indicated that our industry is lacking in program managers...soft- ware developments get bigger, more complicated, and more dependent on senior software pro- fessionals to get the project on the right path

  1. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    PubMed Central

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. Conclusions At the sites, project leaders served as travel guides, assisting and overseeing the programs as they traveled from the global plans to local actions. Project leaders, while hypothetically in control of the programs, in fact shared control of the traveling of the programs with patients, clinicians, and outside consultants. From this work, we can learn what roadblocks and expenses occur while a technology travels, from a project leader’s point of view. PMID:22578251

  2. Distributed Information System Development: Review of Some Management Issues

    NASA Astrophysics Data System (ADS)

    Mishra, Deepti; Mishra, Alok

    Due to the proliferation of the Internet and globalization, distributed information system development is becoming popular. In this paper we have reviewed some significant management issues like process management, project management, requirements management and knowledge management issues which have received much attention in distributed development perspective. In this literature review we found that areas like quality and risk management issues could get only scant attention in distributed information system development.

  3. The Business Case for Systems Engineering Study: Results of the Systems Engineering Effectiveness Survey

    DTIC Science & Technology

    2012-11-01

    reflecting the fact that project managers can often optimize the value of one of these parameters, but only at the expense of the other two. For example...which system developers can compare their SE capabilities to manage SE process improvements. As a reward for their participation, the companion...higher requirements development and management capability is strongly associat- ed with better program performance, particularly on challenging projects

  4. A Study on the Self-Adaption Incentive Performance Salary

    NASA Astrophysics Data System (ADS)

    Zhang, Chuanming; Wang, Yang

    In project managing, the performance salary management mode is often used to motivate project managers and other similar staff to improve performance or reduce the cost. But the engineering activities who own a lot of internal and external uncertain factors can not be known by the principle. It is difficult for to develop a suitable incentive target to project managers etch. This paper thinks that the manager self master the maximum of information on engineering activities. So this paper sets up an incentive model: the project managers themselves report performance objectives; owner gives the managers reward or punishment combined with their reported performance and actual performance. The model to ensure that the project manager is only accurate self reported its results to get the maximum profit. At the same time, it cans incentive managers to improve performance or reduce the cost. This paper focuses on setting up the model, analyzing the model parameters. And cite an example analyze them.

  5. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    ERIC Educational Resources Information Center

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  6. Computer-aided software development process design

    NASA Technical Reports Server (NTRS)

    Lin, Chi Y.; Levary, Reuven R.

    1989-01-01

    The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

  7. An Integrated Hydrologic-Economic Modeling Tool for Evaluating Water Management Responses to Climate Change in the Boise River Basin

    NASA Astrophysics Data System (ADS)

    Schmidt, R. D.; Taylor, R. G.; Stodick, L. D.; Contor, B. A.

    2009-12-01

    A recent federal interagency report on climate change and water management (Brekke et. al., 2009) describes several possible management responses to the impacts of climate change on water supply and demand. Management alternatives include changes to water supply infrastructure, reservoir system operations, and water demand policies. Water users in the Bureau of Reclamation’s Boise Project (located in the Lower Boise River basin in southwestern Idaho) would be among those impacted both hydrologically and economically by climate change. Climate change and management responses to climate change are expected to cause shifts in water supply and demand. Supply shifts would result from changes in basin precipitation patterns, and demand shifts would result from higher evapotranspiration rates and a longer growing season. The impacts would also extend to non-Project water users in the basin, since most non-Project groundwater pumpers and drain water diverters rely on hydrologic externalities created by seepage losses from Boise Project water deliveries. An integrated hydrologic-economic model was developed for the Boise basin to aid Reclamation in evaluating the hydrologic and economic impacts of various management responses to climate change. A spatial, partial-equilibrium, economic optimization model calculates spatially-distinct equilibrium water prices and quantities, and maximizes a social welfare function (the sum of consumer and producers surpluses) for all agricultural and municipal water suppliers and demanders (both Project and non-Project) in the basin. Supply-price functions and demand-price functions are exogenous inputs to the economic optimization model. On the supply side, groundwater and river/reservoir models are used to generate hydrologic responses to various management alternatives. The response data is then used to develop water supply-price functions for Project and non-Project water users. On the demand side, crop production functions incorporating crop distribution, evapotranspiration rates, irrigation efficiencies, and crop prices are used to develop water demand-price functions for agricultural water users. Demand functions for municipal and industrial water users are also developed. Recent applications of the integrated model have focused on the hydrologic and economic impacts of demand management alternatives, including large-scale canal lining conservation measures, and market-based water trading between canal diverters and groundwater pumpers. A supply management alternative being investigated involves revising reservoir rule curves to compensate for climate change impacts on timing of reservoir filling.

  8. Novel Problem Solving - The NASA Solution Mechanism Guide

    NASA Technical Reports Server (NTRS)

    Keeton, Kathryn E.; Richard, Elizabeth E.; Davis, Jeffrey R.

    2014-01-01

    Over the past five years, the Human Health and Performance (HH&P) Directorate at the NASA Johnson Space Center (JSC) has conducted a number of pilot and ongoing projects in collaboration and open innovation. These projects involved the use of novel open innovation competitions that sought solutions from "the crowd", non-traditional problem solvers. The projects expanded to include virtual collaboration centers such as the NASA Human Health and Performance Center (NHHPC) and more recently a collaborative research project between NASA and the National Science Foundation (NSF). These novel problem-solving tools produced effective results and the HH&P wanted to capture the knowledge from these new tools, to teach the results to the directorate, and to implement new project management tools and coursework. The need to capture and teach the results of these novel problem solving tools, the HH&P decided to create a web-based tool to capture best practices and case studies, to teach novice users how to use new problem solving tools and to change project management training/. This web-based tool was developed with a small, multi-disciplinary group and named the Solution Mechanism Guide (SMG). An alpha version was developed that was tested against several sessions of user groups to get feedback on the SMG and determine a future course for development. The feedback was very positive and the HH&P decided to move to the beta-phase of development. To develop the web-based tool, the HH&P utilized the NASA Tournament Lab (NTL) to develop the software with TopCoder under an existing contract. In this way, the HH&P is using one new tool (the NTL and TopCoder) to develop the next generation tool, the SMG. The beta-phase of the SMG is planed for release in the spring of 2014 and results of the beta-phase testing will be available for the IAC meeting in September. The SMG is intended to disrupt the way problem solvers and project managers approach problem solving and to increase the use of novel and more cost and time effective problem solving tools such as open innovation, collaborative research, and virtual collaborative project centers. The HH&P envisions changing project management coursework by including the SMG in the teaching of project management problem solving tools.

  9. Challenges and opportunities of multi-disciplinary, multi-national and multi-sectoral projects

    NASA Astrophysics Data System (ADS)

    Reitz, Anja; Hamann, Kristin

    2017-04-01

    Collaborative research projects e.g. funded or supported by the European Commission are by nature multi-national. Often EU calls bring together different scientific communities to jointly tackle challenges that can only be addressed through the convergence of previously separated disciplines in one research consortium. Some work programmes even necessitate to team up as different disciplines as natural sciences, social science, legal science and economic science. Examples for such multi- national, -disciplinary and - sectoral projects are the EU projects ECO2 (FP7, concluded), AtlantOS (H2020) and MiningImpact (JPI Oceans). Project managers of such projects need to develop skills beyond the common technical and management skills namely go into the domain of partners and stakeholders psychology and be able to maintain different perspectives on communication and interaction needs regarding cultural-, discipline- and sectoral background. Accordingly, the project manager has besides his or her technical role as manager at least three further roles: that of a communicator, that of a mediator and that of a person convincing partners of the necessary and selling the project products to the stakeholders. As the typical project manager has not too much power and authority by his or her position he or she has to use the power of smart communication and persuasion to overcome potential dissension between disciplines, national reservation or potential conflicts regarding different sectoral views. Accordingly, the project manager of such complex projects would try to arrange the ideal working environment by considering cultural feel, the cooperation of disciplines, information and the control of resources. The way he or she develops such ideal working environment is by reflection of past, present and future experiences/needs.

  10. Effective factor of virtual team: Resolving communication breakdown in IBS construction project

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.

    2016-08-01

    Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.

  11. RESULTS OF THE ENVIRONMENTAL MANAGEMENT (EM) CORPORATE PROJECT TEAM DISPOSING WASTE & REDUCING RISK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SHRADER, T.A.; KNERR, R.

    2005-01-31

    In 2002, the US Department of Energy's (DOE) Office of Environmental Management (EM) released the Top-To-Bottom Review of cognizant clean-up activities around the DOE Complex. The review contained a number of recommendations for changing the way EM operates in order to reduce environmental risk by significantly accelerating clean-up at the DOE-EM sites. In order to develop and implement these recommendations, a number of corporate project teams were formed to identify, evaluate, and initiate implementation of alternatives for the different aspects of clean-up. In August 2002, a corporate team was formed to review all aspects of the management, treatment, and disposalmore » of low level radioactive waste (LLW), mixed low level radioactive waste (MLLW), transuranic waste (TRU), and hazardous waste (HW). Over the next 21 months, the Corporate Project Team: Disposing Waste, Reducing Risk, developed a number of alternatives for implementing the recommendations of the Top-To-Bottom Review based on information developed during numerous site visits and interviews with complex and industry personnel. With input from over a dozen EM sites at various stages of clean-up, the team identified the barriers to the treatment and disposal of low level waste, mixed low level waste, and transuranic waste. Once identified, preliminary design alternatives were developed and presented to the Acquisition Authority (for this project, the Assistant Secretary for Environmental Management) for review and approval. Once the preliminary design was approved, the team down selected to seven key alternatives which were subsequently fully developed in the Project Execution Plan. The seven most viable alternatives were: (1) creation of an Executive Waste Disposal Board; (2) projectizing the disposal of low level waste and mixed low level waste; (3) creation of a National Consolidation and Acceleration Facility for waste; (4) improvements to the Broad Spectrum contract; (5) improvements to the Toxic Substance Control Act (TSCA) Incinerator contract and operations; (6) development of a policy for load management of waste shipments to the Waste Isolation Pilot Plant (WIPP); and (7) development of a complex-wide fee incentive for transuranic waste disposal. The alternatives were further refined and a plan developed for institutionalizing the alternatives in various site contracts. In order to focus the team's efforts, all team activities were conducted per the principles of DOE Order 413.3, Program and Project Management for the Acquisition of Capital Assets. Although the Order was developed for construction projects, the principles were adapted for use on this ''soft'' project in which the deliverables were alternatives for the way work was performed. The results of the team's investigation and the steps taken during the project are presented along with lessons learned.« less

  12. Software Smarts

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Under an SBIR (Small Business Innovative Research) contract with Johnson Space Center, Knowledge Based Systems Inc. (KBSI) developed an intelligent software environment for modeling and analyzing mission planning activities, simulating behavior, and, using a unique constraint propagation mechanism, updating plans with each change in mission planning activities. KBSI developed this technology into a commercial product, PROJECTLINK, a two-way bridge between PROSIm, KBSI's process modeling and simulation software and leading project management software like Microsoft Project and Primavera's SureTrak Project Manager.

  13. Doing Projects in a Foreign Language — Communications Management, Issues and Strategies

    NASA Astrophysics Data System (ADS)

    Xian, Deling

    The Qinghai Salt Lake Industry Co. Ltd. (QSLIC) smelter project involves a Chinese state-owned client, a Canadian engineering company, their American technology partner, several Chinese design institutes and international vendors. Proper technical communication plays an important role during the development of a project in a foreign language and across cultures. Using the QSLIC project as an example, this paper presents the role of Communications Manager and personal qualifications required, as well as technical communications management, issues and strategies, lessons learnt while doing smelter projects in China and Chinese business culture and etiquette.

  14. Marshall Space Flight Center Ground Systems Development and Integration

    NASA Technical Reports Server (NTRS)

    Wade, Gina

    2016-01-01

    Ground Systems Development and Integration performs a variety of tasks in support of the Mission Operations Laboratory (MOL) and other Center and Agency projects. These tasks include various systems engineering processes such as performing system requirements development, system architecture design, integration, verification and validation, software development, and sustaining engineering of mission operations systems that has evolved the Huntsville Operations Support Center (HOSC) into a leader in remote operations for current and future NASA space projects. The group is also responsible for developing and managing telemetry and command configuration and calibration databases. Personnel are responsible for maintaining and enhancing their disciplinary skills in the areas of project management, software engineering, software development, software process improvement, telecommunications, networking, and systems management. Domain expertise in the ground systems area is also maintained and includes detailed proficiency in the areas of real-time telemetry systems, command systems, voice, video, data networks, and mission planning systems.

  15. 14 CFR 151.21 - Procedures: Application; general information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIRPORTS FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects... Federal aid for eligible airport development must submit to the Area Manager of the area in which the... the project development; and (2) The sponsor's written assurance, if the project involves displacement...

  16. Applying Project Management Strategies in a Large Curriculum Conversion Project in Higher Education

    ERIC Educational Resources Information Center

    Gardner, Joel; Bennett, Patrick A.; Hyatt, Niccole; Stoker, Kevin

    2017-01-01

    Higher education is undergoing great changes that require universities to adapt quickly, and making these changes can be difficult. One discipline that can aid in executing change is project management, which has developed a set of clear processes and strategies for completing initiatives quickly and effectively. Several authors have identified…

  17. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    ERIC Educational Resources Information Center

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  18. Price projections for selected grades of Douglas-fir, coast hem-fir, inland hem-fir, and ponderosa pine lumber.

    Treesearch

    Richard W. Haynes; Roger D. Fight

    1992-01-01

    Grade-specific price projections were developed for Douglas-fir, coast hem-fir, inland hem-fir, and ponderosa pine lumber. These grade-specific price projections can be used in evaluating management practices that will affect the quality of saw logs produced under various management regimes.

  19. Academic Mobility Projects Management: Challenges for Ukrainian Professional Education

    ERIC Educational Resources Information Center

    Zabolotna, Oksana

    2015-01-01

    The article is devoted to the academic mobility projects management on the example of Pavlo Tychyna Uman State Pedagogical University in the Erasmus Mundus Projects, namely, EMINENCE and EMINENCE II. It has been pointed out that modern university is a constantly developing system possessing a hidden potential for innovations. Thus, the…

  20. Software for improving the quality of project management, a case study: international manufacture of electrical equipment

    NASA Astrophysics Data System (ADS)

    Preradović, D. M.; Mićić, Lj S.; Barz, C.

    2017-05-01

    Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.

  1. Decision analysis and drug development portfolio management: uncovering the real options value of your projects.

    PubMed

    Rosati, Nicoletta

    2002-04-01

    Project selection and portfolio management are particularly challenging in the pharmaceutical industry due to the high risk - high stake nature of the drug development process. In the recent years, scholars and industry experts have agreed that traditional Net-Present-Value evaluation of the projects fails to capture the value of managerial flexibility, and encouraged adopting a real options approach to recover the missed value. In this paper, we take a closer look at the drug development process and at the indices currently used to rank projects. We discuss the economic value of information and of real options arising in drug development and present decision analysis as an ideal framework for the implementation of real options valuation.

  2. Managing Fault Management Development

    NASA Technical Reports Server (NTRS)

    McDougal, John M.

    2010-01-01

    As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

  3. FRACTAL Systems & Project suite: engineering tools for improving development and operation of the systems

    NASA Astrophysics Data System (ADS)

    Pérez-Calpena, A.; Mujica-Alvarez, E.; Osinde-Lopez, J.; García-Vargas, M.

    2008-07-01

    This paper describes the FRACTAL Systems & Projects suite. This suite is composed by several tools (GECO, DOCMA and SUMO) that provide the capabilities that all organizations need to store and manage the system information generated along the project's lifetime, from the design phase to the operation phase. The amount of information that is generated in a project keeps growing in size and complexity along the project's lifetime, to an extent that it becomes impossible to manage it without the aid of specific computer-based tools. The suite described in this paper is the solution developed by FRACTAL to assist the execution of different scientific projects, mainly related with telescopes and instruments, for astronomical research centres. These tools help the system and project engineers to maintain the technical control of the systems and to ensure an optimal use of the resources. GECO eases the control of the system configuration data; DOCMA provides the means to organise and manage the documents generated in the project; SUMO allows managing and scheduling the operation, the maintenance activities and the resources during the operational phase of a system. These tools improve the project communication making the information available to the authorized users (project team, customers, Consortium's members, etc). Finally and depending on the project needs, these three tools can be used integrated or in an independent manner.

  4. All Hazards Risk Assessment Transition Project: Report on Capability Assessment Management System (CAMS) Automation

    DTIC Science & Technology

    2014-04-01

    All Hazards Risk Assessment Transition Project : Report on Capability Assessment Management System (CAMS) Automation...Prepared by: George Giroux Computer Applications Specialist Modis155 Queen Street, Suite 1206 Ottawa, ON K1P 6L1 Contract # THS 2335474-2 Project ...Under a Canadian Safety and Security Program (CSSP) targeted investigation (TI) project (CSSP-2012-TI- 1108), Defence Research and Development

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lockwood, Jr., Neil; McLellan, Jason G; Crossley, Brian

    The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, commonly known as the Joint Stock Assessment Project (JSAP) is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (blocked area). The three-phase approach of this project will enhance the fisheries resources of the blocked area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information housed in a central location will allow managersmore » to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP (NWPPC program measure 10.8B.26) is designed and guided jointly by fisheries managers in the blocked area and the Columbia Basin blocked area management plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of blocked area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the blocked area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. The use of common collection and analytical tools is essential to the process of streamlining joint management decisions. In 1999 and 2000 the project began to address some of the identified data gaps, throughout the blocked area, with a variety of newly developed sampling projects, as well as, continuing with ongoing data collection of established projects.« less

  6. Systems Engineering and Project Management for Product Development: Optimizing Their Working Interfaces

    DTIC Science & Technology

    2013-09-01

    reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instruction...Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE... 1   A.  BACKGROUND ................................................................................... 1   B.  PRODUCT DEVELOPMENT

  7. Monitoring software development through dynamic variables

    NASA Technical Reports Server (NTRS)

    Doerflinger, Carl W.; Basili, Victor R.

    1983-01-01

    Research conducted by the Software Engineering Laboratory (SEL) on the use of dynamic variables as a tool to monitor software development is described. Project independent measures which may be used in a management tool for monitoring software development are identified. Several FORTRAN projects with similar profiles are examined. The staff was experienced in developing these types of projects. The projects developed serve similar functions. Because these projects are similar some underlying relationships exist that are invariant between projects. These relationships, once well defined, may be used to compare the development of different projects to determine whether they are evolving the same way previous projects in this environment evolved.

  8. Year 2000 Computerized Farm Project. Final Report.

    ERIC Educational Resources Information Center

    McGrann, James M.; Lippke, Lawrence A.

    An ongoing project was funded to develop and demonstrate a computerized approach to operation and management of a commercial-sized farm. Other project objectives were to facilitate the demonstration of the computerized farm to the public and to develop individual software packages and make them available to the public. Project accomplishments…

  9. Let's Build a Sailboat: A Differentiated Gifted Education Project.

    ERIC Educational Resources Information Center

    Forster, Bruce R.

    1990-01-01

    A rationale is presented for developing gifted education projects that are differentiated from the regular curriculum. A specific activity, called "Let's Build a Sailboat," is described to illustrate guiding principles for success in student project development. The project taught planning and management skills to junior high school gifted…

  10. Collaboration across eight research centers: unanticipated benefits and outcomes for project managers.

    PubMed

    Perez, Norma A; Weathers, Benita; Willis, Marilyn; Mendez, Jacqueline

    2013-02-01

    Managers of transdisciplinary collaborative research lack suitable didactic material to support the implementation of research methodologies and to build ongoing partnerships with community representatives and peers, both between and within multiple academic centers. This article will provide insight on the collaborative efforts of project managers involved in multidisciplinary research and their subsequent development of a tool kit for research project managers and/or directors. Project managers from the 8 Centers for Population Health and Health Disparities across the nation participated in monthly teleconferences to share experiences and offer advice on how to achieve high participation rates and maintain community involvement in collaboration with researchers and community leaders to achieve the common goal of decreasing health inequities. In the process, managers recognized and seized the opportunity to produce a tool kit that was designed for future project managers and directors. Project managers in geographically distinct locations maintained a commitment to work together over 4 years and subsequently built upon an existing communications network to design a tool kit that could be disseminated easily to a diverse audience.

  11. Risk management integration into complex project organizations

    NASA Technical Reports Server (NTRS)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  12. Pennsylvania: Penn State University Integrated Pest Management Project (A Former EPA CARE Project)

    EPA Pesticide Factsheets

    Penn State University (PSU) is the recipient of a Level II CARE cooperative agreement targeting environmental risks in Philadelphia communities. PSU is involved in developing IPM management practices recommendations and policies.

  13. Software Project Management and Measurement on the World-Wide-Web (WWW)

    NASA Technical Reports Server (NTRS)

    Callahan, John; Ramakrishnan, Sudhaka

    1996-01-01

    We briefly describe a system for forms-based, work-flow management that helps members of a software development team overcome geographical barriers to collaboration. Our system, called the Web Integrated Software Environment (WISE), is implemented as a World-Wide-Web service that allows for management and measurement of software development projects based on dynamic analysis of change activity in the workflow. WISE tracks issues in a software development process, provides informal communication between the users with different roles, supports to-do lists, and helps in software process improvement. WISE minimizes the time devoted to metrics collection and analysis by providing implicit delivery of messages between users based on the content of project documents. The use of a database in WISE is hidden from the users who view WISE as maintaining a personal 'to-do list' of tasks related to the many projects on which they may play different roles.

  14. ASK Magazine. No. 15

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    WELCOME TO THE ACADEMY OF PROGRAM AND PROJECT Leadership (APPL) and ASK Magazine. APPL helps NASA managers and project teams accomplish today s missions and meet tomorrow s challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportu- nities for project management collaboration with univer- sities, professional associations, industry partners, and other government agencies. ASK Magazine grew out of APPL s Knowledge Sharing Initiative. The stories that appear in ASK are written by the best of the best project managers, primarily from NASA, but also from other government agencies and industry. In a mature view of the subject career development is not simply four years of college or a week at training, culminating in a diploma or a certificate to hang on an office wall. That s why we wanted to take a broad look at career development in this issue of ASK.

  15. Defense AT&L. Volume 37, Number 4, July-August 2008

    DTIC Science & Technology

    2008-08-01

    allowed the Greek philosopher to share some tidbits of wisdom regarding pro- gram management and changing the way we view chaos and order. 21...on your team. Virtual teaming is chang- ing the way we develop and work with team members. 37 Project Manager and Program Manager : What’s the...Difference? Jeffrey Peisach and Timothy S. Kroecker Identifying the roles and responsibilities of project managers and program managers will

  16. Onshore and Offshore Outsourcing with Agility: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Kussmaul, Clifton

    This chapter reflects on case study based an agile distributed project that ran for approximately three years (from spring 2003 to spring 2006). The project involved (a) a customer organization with key personnel distributed across the US, developing an application with rapidly changing requirements; (b) onshore consultants with expertise in project management, development processes, offshoring, and relevant technologies; and (c) an external offsite development team in a CMM-5 organization in southern India. This chapter is based on surveys and discussions with multiple participants. The several years since the project was completed allow greater perspective on both the strengths and weaknesses, since the participants can reflect on the entire life of the project, and compare it to subsequent experiences. Our findings emphasize the potential for agile project management in distributed software development, and the importance of people and interactions, taking many small steps to find and correct errors, and matching the structures of the project and product to support implementation of agility.

  17. [Design, implementation and evaluation of a management model of patient safety in hospitals in Catalonia, Spain].

    PubMed

    Saura, Rosa Maria; Moreno, Pilar; Vallejo, Paula; Oliva, Glòria; Alava, Fernando; Esquerra, Miquel; Davins, Josep; Vallès, Roser; Bañeres, Joaquim

    2014-07-01

    Since its inception in 2006, the Alliance for Patient Safety in Catalonia has played a major role in promoting and shaping a series of projects related to the strategy of the Ministry of Health, Social Services and Equality, for improving patient safety. One such project was the creation of functional units or committees of safety in hospitals in order to facilitate the management of patient safety. The strategy has been implemented in hospitals in Catalonia which were selected based on criteria of representativeness. The intervention was based on two lines of action, one to develop the model framework and the other for its development. Firstly the strategy for safety management based on EFQM (European Foundation for Quality Management) was defined with the development of standards, targets and indicators to implement security while the second part involved the introduction of tools, methodologies and knowledge to the management support of patient safety and risk prevention. The project was developed in four hospital areas considered higher risk, each assuming six goals for safety management. Some of these targets such as the security control panel or system of adverse event reporting were shared. 23 hospitals joined the project in Catalonia. Despite the different situations in each centre, high compliance was achieved in the development of the objectives. In each of the participating areas the security control panel was developed. Stable structures for safety management were established or strengthened. Training in patient safety played and important role, 1415 professionals participated. Through these kind of projects not only have been introduced programs of proven effectiveness in reducing risks, but they also provide to the facilities a work system that allows autonomy in diagnosis and analysis of the different risk situations or centre specific safety issues. Copyright © 2014. Published by Elsevier Espana.

  18. Management Of Optical Projects

    NASA Astrophysics Data System (ADS)

    Young, Peter S.; Olson, David R.

    1981-03-01

    This paper discusses the management of optical projects from the concept stage, beginning with system specifications, through design, optical fabrication and test tasks. Special emphasis is placed on effective coupling of design engineering with fabrication development and utilization of available technology. Contrasts are drawn between accepted formalized management techniques, the realities of dealing with fragile components and the necessity of an effective project team which integrates the special characteristics of highly skilled optical specialists including lens designers, optical engineers, opticians, and metrologists. Examples are drawn from the HEAO-2 X-Ray Telescope and Space Telescope projects.

  19. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  20. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  1. Competencies for the provision of comprehensive medication management services in an experiential learning project

    PubMed Central

    de Freitas, Erika Lourenço; Ramalho de Oliveira, Djenane

    2017-01-01

    Objective To understand students’ and tutors’ perceptions of the development of clinical competencies for the delivery of comprehensive medication management services in an experiential learning project linked to a Brazilian school of pharmacy. Methods An autoethnographic qualitative study was carried out based on participant observation, focus groups and individual interviews with students and tutors involved in an experiential learning project. Results The study revealed the development of competencies related to the philosophy of practice, the pharmacotherapy workup of drug therapy and interprofessional relationships. Conclusions The experiential learning project contributed to the professional development of pharmacy students in pharmaceutical care practice, pointing to its potential benefits for incorporation into professional pharmacy curricula. PMID:28950021

  2. Competencies for the provision of comprehensive medication management services in an experiential learning project.

    PubMed

    Mendonça, Simone de Araújo Medina; Freitas, Erika Lourenço de; Ramalho de Oliveira, Djenane

    2017-01-01

    To understand students' and tutors' perceptions of the development of clinical competencies for the delivery of comprehensive medication management services in an experiential learning project linked to a Brazilian school of pharmacy. An autoethnographic qualitative study was carried out based on participant observation, focus groups and individual interviews with students and tutors involved in an experiential learning project. The study revealed the development of competencies related to the philosophy of practice, the pharmacotherapy workup of drug therapy and interprofessional relationships. The experiential learning project contributed to the professional development of pharmacy students in pharmaceutical care practice, pointing to its potential benefits for incorporation into professional pharmacy curricula.

  3. Integration and Test for Small Shuttle Payloads

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.; Day, John H. (Technical Monitor)

    2001-01-01

    Recommended approaches for shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of small shuttle payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of the NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration, and interface testing; and (7) Postflight operations. This paper is of special interest to those payload projects which have small budgets and few resources: That is, the truly 'faster, cheaper, better' projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

  4. Global perspective of watershed management

    Treesearch

    Kenneth N. Brooks; Karlyn Eckman

    2000-01-01

    This paper discusses the role of watershed management in moving towards sustainable natural resource and agricultural development. Examples from 30 field projects and six training projects involving over 25 countries are presented to illustrate watershed management initiatives that have been implemented over the last half of the 20th century. The level of success has...

  5. Urban Wood-Based Bio-Energy Systems in Seattle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stan Gent, Seattle Steam Company

    2010-10-25

    Seattle Steam Company provides thermal energy service (steam) to the majority of buildings and facilities in downtown Seattle, including major hospitals (Swedish and Virginia Mason) and The Northwest (Level I) Regional Trauma Center. Seattle Steam has been heating downtown businesses for 117 years, with an average length of service to its customers of 40 years. In 2008 and 2009 Seattle Steam developed a biomass-fueled renewable energy (bio-energy) system to replace one of its gas-fired boilers that will reduce greenhouse gases, pollutants and the amount of waste sent to landfills. This work in this sub-project included several distinct tasks associated withmore » the biomass project development as follows: a. Engineering and Architecture: Engineering focused on development of system control strategies, development of manuals for start up and commissioning. b. Training: The project developer will train its current operating staff to operate equipment and facilities. c. Flue Gas Clean-Up Equipment Concept Design: The concept development of acid gas emissions control system strategies associated with the supply wood to the project. d. Fuel Supply Management Plan: Development of plans and specifications for the supply of wood. It will include potential fuel sampling analysis and development of contracts for delivery and management of fuel suppliers and handlers. e. Integrated Fuel Management System Development: Seattle Steam requires a biomass Fuel Management System to track and manage the delivery, testing, processing and invoicing of delivered fuel. This application will be web-based and accessed from a password-protected URL, restricting data access and privileges by user-level.« less

  6. The international charter for space and major disasters--project manager training

    USGS Publications Warehouse

    Jones, Brenda

    2011-01-01

    Regional Project Managers for the Charter are developed through training courses, which typically last between 3 and 5 days and are held in a central location for participants. These courses have resulted in increased activations and broader use of Charter data and information by local emergency management authorities. Project Managers are nominated according to either their regional affiliation or their specific areas of expertise. A normal activation takes 2 to 3 weeks to complete, with all related expenses the responsibility of the PM's home agency.

  7. 33 CFR 332.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... following terms are defined: Adaptive management means the development of a management strategy that... guides modification of those projects to optimize performance. It includes the selection of appropriate... monitoring results to identify potential problems of a compensatory mitigation project and the identification...

  8. Technical Support for Contaminated Sites

    EPA Science Inventory

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...

  9. Event-driven management algorithm of an Engineering documents circulation system

    NASA Astrophysics Data System (ADS)

    Kuzenkov, V.; Zebzeev, A.; Gromakov, E.

    2015-04-01

    Development methodology of an engineering documents circulation system in the design company is reviewed. Discrete event-driven automatic models using description algorithms of project management is offered. Petri net use for dynamic design of projects is offered.

  10. A Management Development Course for Physicians

    ERIC Educational Resources Information Center

    Plovnick, Mark S.; And Others

    1977-01-01

    Developed and tested by the Health Management Project at the MIT Sloan School of Management, this course was designed to provide a more accurate understanding of the relevance and usefulness of management education to physicians and to train physicians in some basic management skills. Its content and field tests are described. (LBH)

  11. Pan-European management of coastal lagoons: A science-policy-stakeholder interface perspective

    NASA Astrophysics Data System (ADS)

    Lillebø, Ana I.; Stålnacke, Per; Gooch, Geoffrey D.; Krysanova, Valentina; Bielecka, Małgorzata

    2017-11-01

    The main objective of the work carried out in the scope of a three years collaborative research project was to develop science-based strategies and a decision support framework for the integrated management of coastal lagoons and their catchments and, in this context, to enhance connectivity between research and policymaking. In this paper our main objective is to share the lessons learned from the innovative methodology used throughout the project. To achieve the proposed objectives, the multidisciplinary scientific knowledge in the project team was combined and integrated with the knowledge and views of local stakeholders of four selected European coastal lagoons, using a three step participatory approach. With this innovative approach, which included the usage of eco-hydrological and water quality-modelling tools, the team developed and analyzed integrated scenarios of possible economic development and environmental impacts in four European lagoons and their catchments. These scenarios were presented and discussed with stakeholders, giving rise to management recommendations for each case study lagoon. Results show that some management options might be transferrable to other European lagoons having similar climatic, geophysical and socio-economic settings. In management terms, the project output provides a set of policy guidelines derived from the different analyses conducted and proposes initiatives concerning management implementation in a local-regional-national-European setting.

  12. Exploring Stakeholder Definitions within the Aerospace Industry: A Qualitative Case Study

    NASA Astrophysics Data System (ADS)

    Hebert, Jonathan R.

    A best practice in the discipline of project management is to identify all key project stakeholders prior to the execution of a project. When stakeholders are properly identified, they can be consulted to provide expert advice on project activities so that the project manager can ensure the project stays within the budget and schedule constraints. The problem addressed by this study is that managers fail to properly identify key project stakeholders when using stakeholder theory because there are multiple conflicting definitions for the term stakeholder. Poor stakeholder identification has been linked to multiple negative project outcomes such as budget and schedules overruns, and this problem is heightened in certain industries such as aerospace. The purpose of this qualitative study was to explore project managers' and project stakeholders' perceptions of how they define and use the term stakeholder within the aerospace industry. This qualitative exploratory single-case study had two embedded units of analysis: project managers and project stakeholders. Six aerospace project managers and five aerospace project stakeholders were purposively selected for this study. Data were collected through individual semi-structured interviews with both project managers and project stakeholders. All data were analyzed using Yin's (2011) five-phased cycle approach for qualitative research. The results indicated that the aerospace project managers and project stakeholder define the term stakeholder as "those who do the work of a company." The participants build upon this well-known concept by adding that, "a company should list specific job titles" that correspond to their company specific-stakeholder definition. Results also indicated that the definition of the term stakeholder is used when management is assigning human resources to a project to mitigate or control project risk. Results showed that project managers tended to include the customer in their stakeholder definitions while project stakeholders included a wider range of stakeholders from young employees to union workers. Practical application recommendations, based on the study's findings, include that companies start to develop company-specific definitions of the term stakeholder. Recommendations for future research should focus on exploring how CEOs, executive members, new hires, and hourly workers define and use the term stakeholder in the aerospace industry.

  13. Project Summary Report

    NASA Technical Reports Server (NTRS)

    Upchurch, Christopher

    2011-01-01

    The project, being the development of resource management applications, consisted entirely of my own effort. From deliverable requirements provided by my mentor, and some functional requirement additions generated through design reviews, It was my responsibility to implement the requested features as well as possible, given the resources available. For the most part development work consisted of database programming and functional testing using real resource data. Additional projects I worked on included some firing room console training, configuring the new NE-A microcontroller development lab network, mentoring high school CubeSat students, and managing the NE interns' component of the mentor appreciation ceremony.

  14. Chapter 2 - An overview of the LANDFIRE Prototype Project

    Treesearch

    Matthew G. Rollins; Robert E. Keane; Zhiliang Zhu; James P. Menakis

    2006-01-01

    This chapter describes the background and design of the Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, which was a sub-regional, proof-of-concept effort designed to develop methods and applications for providing the high-resolution data (30-m pixel) needed to support wildland fire management and to implement the...

  15. The Forest Service, Rocky Mountain Research Station's Southwestern Borderlands Ecosystem Management Project: building on ten years of success [Abstract

    Treesearch

    Gerald J. Gottfried; Carleton B. Edminster

    2005-01-01

    The USDA Forest Service initiated the Southwestern Borderlands Ecosystem Management Project in 1994. The Project concentrates on the unique, relatively unfragmented landscape of exceptional biological diversity in southeastern Arizona and southwestern New Mexico. Its mission is to: "Contribute to the scientific basis for developing and implementing a comprehensive...

  16. Project MET. A Trainer's Guide. Management for Effective Teaching, A Title IV-C Project.

    ERIC Educational Resources Information Center

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide provides trainers with a format and process for conducting inservice education programs for elementary school teachers on the use of the Management for Effective Teaching (MET) support kit. Project MET is a program developed to aid teachers in the Fairfax County (Virginia) public schools in implementing the school district curriculum,…

  17. Project COMPAS [Consortium for Operating and Managing Programs for the Advancment of Skills]: A Design for Change.

    ERIC Educational Resources Information Center

    Schermerhorn, Leora L., Ed.; And Others

    Descriptive and evaluative information is provided in this report on Project COMPAS (Consortium for Operating and Managing Programs for the Advancement of Skills), a cooperative effort between seven community colleges which developed cognitive skills programs for entry-level freshmen. Chapter I reviews the unique features of Project COMPAS,…

  18. Database Design Learning: A Project-Based Approach Organized through a Course Management System

    ERIC Educational Resources Information Center

    Dominguez, Cesar; Jaime, Arturo

    2010-01-01

    This paper describes an active method for database design learning through practical tasks development by student teams in a face-to-face course. This method integrates project-based learning, and project management techniques and tools. Some scaffolding is provided at the beginning that forms a skeleton that adapts to a great variety of…

  19. Quality Management Framework for Total Diet Study centres in Europe.

    PubMed

    Pité, Marina; Pinchen, Hannah; Castanheira, Isabel; Oliveira, Luisa; Roe, Mark; Ruprich, Jiri; Rehurkova, Irena; Sirot, Veronique; Papadopoulos, Alexandra; Gunnlaugsdóttir, Helga; Reykdal, Ólafur; Lindtner, Oliver; Ritvanen, Tiina; Finglas, Paul

    2018-02-01

    A Quality Management Framework to improve quality and harmonization of Total Diet Study practices in Europe was developed within the TDS-Exposure Project. Seventeen processes were identified and hazards, Critical Control Points and associated preventive and corrective measures described. The Total Diet Study process was summarized in a flowchart divided into planning and practical (sample collection, preparation and analysis; risk assessment analysis and publication) phases. Standard Operating Procedures were developed and implemented in pilot studies in five organizations. The flowchart was used to develop a quality framework for Total Diet Studies that could be included in formal quality management systems. Pilot studies operated by four project partners were visited by project assessors who reviewed implementation of the proposed framework and identified areas that could be improved. The quality framework developed can be the starting point for any Total Diet Study centre and can be used within existing formal quality management approaches. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Program Helps Standardize Documentation Of Software

    NASA Technical Reports Server (NTRS)

    Howe, G.

    1994-01-01

    Intelligent Documentation Management System, IDMS, computer program developed to assist project managers in implementing information system documentation standard known as NASA-STD-2100-91, NASA STD, COS-10300, of NASA's Software Management and Assurance Program. Standard consists of data-item descriptions or templates, each of which governs particular component of software documentation. IDMS helps program manager in tailoring documentation standard to project. Written in C language.

  1. Installation Restoration Program Preliminary Assessment, Big Mountain Radio Relay Station, Alaska

    DTIC Science & Technology

    1989-04-01

    DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design, project management and implementation of various...management functions, as well as direct involvement in project marketing, corporate computer and CAD operations, and company R&D efforts. 5 DETOX , Inc...interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as sale and management of several substantial and

  2. Improving Life-Cycle Cost Management of Spacecraft Missions

    NASA Technical Reports Server (NTRS)

    Clardy, Dennon

    2010-01-01

    This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

  3. Engineering data management: Experience and projections

    NASA Technical Reports Server (NTRS)

    Jefferson, D. K.; Thomson, B.

    1978-01-01

    Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.

  4. The Role of an Academic Development Unit in Supporting Institutional VET Learning and Teaching Change Management

    ERIC Educational Resources Information Center

    Fotinatos, Nina

    2016-01-01

    The aim of this paper is to examine the role and impact of a central academic development unit (ADU) within an institutional strategic and operational change management project. The primary goal of this project was to improve vocational education and training (VET) learning and teaching practice in an Australian dual-sector regional university.…

  5. Management of Teacher Scientific-Methodical Work in Vocational Educational Institutions on the Basis of Project-Target Approach

    ERIC Educational Resources Information Center

    Shakuto, Elena A.; Dorozhkin, Evgenij M.; Kozlova, Anastasia A.

    2016-01-01

    The relevance of the subject under analysis is determined by the lack of theoretical development of the problem of management of teacher scientific-methodical work in vocational educational institutions based upon innovative approaches in the framework of project paradigm. The purpose of the article is to develop and test a science-based…

  6. Public Participation in Urban Environmental Management: A Model for Promoting Community-Based Environmental Management in Peri-Urban Areas.

    ERIC Educational Resources Information Center

    Yacoob, May; Brantly, Eugene; Whiteford, Linda

    In October 1992, the Water and Sanitation for Health (WASH) Project held a workshop to explore how the U.S. Agency for International Development (USAID) could incorporate community participation as a core element in projects to improve water supply, sanitation, and other environmental conditions of peri-urban areas in developing countries. The…

  7. Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine, Volume 11, March 2003

    NASA Technical Reports Server (NTRS)

    2003-01-01

    APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. Contributors to this issue include: Teresa Bailey, a librarian at the Jet Propulsion Laboratory, Roy Malone, Deputy Director in the Safety and Mission Assurance (S&MA) Office at the NASA Marshall Space Flight Center (MSFC), W. Scott Cameron, Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble, Ray Morgan, recent retiree as Vice President of AeroVironment, Inc., Marty Davis, Program Manager of the Geostationary Operational Environmental Satellite (GOES) at the NASA Goddard Space Flight Center (GSFC) in Greenbelt, Maryland, Todd Post, editor of ASK Magazine, and works for EduTech Ltd. in Silver Spring, Maryland, Dr. Owen Gadeken, professor of Engineering Management at the Defense Acquisition University, Ken Schwer, currently the Project Manager of Solar Dynamics Observatory, Dr. Edward Hoffmwan, Director of the NASA Academy of Program and Project Leadership, Frank Snow, a member of the NASA Explorer Program at Goddard Space Flight Center since 1992, Dr. Alexander Laufer, Editor-in-Chief of ASK Magazine and a member of the Advisory Board of the NASA Academy of Program and Project Leadership, Judy Stokley, presently Air Force Program Executive Officer for Weapons in Washington, D.C. and Terry Little, Director of the Kinetic Energy Boost Office of the Missile Defense Agency.

  8. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burgard, K.G.

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes tomore » systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.« less

  9. Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making

    NASA Technical Reports Server (NTRS)

    Depenbrock, Brett T.; Balint, Tibor S.; Sheehy, Jeffrey A.

    2014-01-01

    Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.

  10. Planning and management of the Nido Reef Complex Oil Field development, Philippines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harry, R.Y.

    1981-01-01

    As Operator for the Northeast Palawan consortium, Philippines-Cities Service, Inc., commenced the Philippines first commercial offshore oil production from the Nido Reef Complex Oil Field on February 1, 1979, some 11 months after a decision by management to start development. The relative speed at which design, fabrication, and construction were accomplished is attributed to the use of the concepts of project planning, task force approach, and project management. This paper presents the above concepts as applied to the Nido Complex.

  11. ENVIRONMENTAL DATA MANAGEMENT IN SUPPORT OF SHARING DATA AND MANAGEMENT

    EPA Science Inventory

    A data management system (DMS) was developed, tested and demonstrated to store and manage water quality and quantity (WQ2) data pertaining to U.S. Environmental Protection Agency/Office of Research and Development (EPA/ORD) research projects in standardized formats. This approach...

  12. The personal receiving document management and the realization of email function in OAS

    NASA Astrophysics Data System (ADS)

    Li, Biqing; Li, Zhao

    2017-05-01

    This software is an independent software system, suitable for small and medium enterprises, contains personal office, scientific research project management and system management functions, independently run in relevant environment, and to solve practical needs. This software is an independent software system, using the current popular B/S (browser/server) structure and ASP.NET technology development, using the Windows 7 operating system, Microsoft SQL Server2005 Visual2008 and database as a development platform, suitable for small and medium enterprises, contains personal office, scientific research project management and system management functions, independently run in relevant environment, and to solve practical needs.

  13. A means to an end: a web-based client management system in palliative care.

    PubMed

    O'Connor, Margaret; Erwin, Trudy; Dawson, Linda

    2009-03-01

    Home-based palliative care (hospice) services require comprehensive and fully integrated information systems to develop and manage the various aspects of their business, incorporating client data and management information. These systems assist in maintaining the quality of client care as well as improved management efficiencies. This article reports on a large not-for-profit home-based palliative care service in Australia, which embarked on a project to develop an electronic data management system specifically designed to meet the needs of the palliative care sector. This web-based client information management system represents a joint venture between the organization and a commercial company and has been a very successful project.

  14. Initiating the 2002 Mars Science Laboratory (MSL) Technology Program

    NASA Technical Reports Server (NTRS)

    Caffrey, Robert T.; Udomkesmalee, Gabriel; Hayati, Samad A.; Henderson, Rebecca

    2004-01-01

    The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to investigate the Martian environment and requires new capabilities that are currently are not available. The MSL Technology Program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by JPL and is divided into a Focused Program and a Base Program. The MSL Technology Program is under the focused program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology's requirements and the development process are tightly coordinated with the Project. The MSL Technology Program combines the proven management techniques of flight projects with the commercial technology management strategies of industry and academia, to create a technology management program that meets the short-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment. This paper also provides an update of the 2003 MSL technology program and examines some of the drivers that changed the program from its initiation.

  15. Task Analysis and Job Descriptions for Robotics/Automated Systems Technicians. Final Report. Volume 1.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…

  16. 33 CFR 279.5 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... utilize an interdisciplinary team with leadership by planning, and participation from engineering, design.... Subsequent aspects of planning, development, and management for the specific project will be directed to... management plans for each specific water resource project, including at least one public meeting. The...

  17. Louisiana traffic sign inventory and management system : LTRC technical summary report.

    DOT National Transportation Integrated Search

    2008-03-01

    This project initiated the development of such a comprehensive asset management system in Louisiana, starting with traffic sign inventory in a single parish. The projects primary goal was to undertake a pilot field inventory of sign attribute data...

  18. Space Station Information Systems

    NASA Technical Reports Server (NTRS)

    Pittman, Clarence W.

    1988-01-01

    The utility of the Space Station is improved, the ability to manage and integrate its development and operation enhanced, and the cost and risk of developing the software for it is minimized by three major information systems. The Space Station Information System (SSIS) provides for the transparent collection and dissemination of operational information to all users and operators. The Technical and Management Information System (TMIS) provides all the developers with timely and consistent program information and a project management 'window' to assess the project status. The Software Support Environment (SSE) provides automated tools and standards to be used by all software developers. Together, these three systems are vital to the successful execution of the program.

  19. Independent technical review, handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction,more » and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.« less

  20. Managing Ada development

    NASA Technical Reports Server (NTRS)

    Green, James R.

    1986-01-01

    The Ada programming language was developed under the sponsorship of the Department of Defense to address the soaring costs associated with software development and maintenance. Ada is powerful, and yet to take full advantage of its power, it is sufficiently complex and different from current programming approaches that there is considerable risk associated with committing a program to be done in Ada. There are also few programs of any substantial size that have been implemented using Ada that may be studied to determine those management methods that resulted in a successful Ada project. The items presented are the author's opinions which have been formed as a result of going through an experience software development. The difficulties faced, risks assumed, management methods applied, and lessons learned, and most importantly, the techniques that were successful are all valuable sources of management information for those managers ready to assume major Ada developments projects.

  1. The declared barriers of the large developing countries waste management projects: The STAR model.

    PubMed

    Bufoni, André Luiz; Oliveira, Luciano Basto; Rosa, Luiz Pinguelli

    2016-06-01

    The aim of this study is to investigate and describe the barriers system that precludes the feasibility, or limits the performance of the waste management projects through the analysis of which are the declared barriers at the 432 large waste management projects registered as CDM during the period 2004-2014. The final product is a waste management barriers conceptual model proposal (STAR), supported by literature and corroborated by projects design documents. This paper uses the computer assisted qualitative content analysis (CAQCA) methodology with the qualitative data analysis (QDA) software NVivo®, by 890 fragments, to investigate the motives to support our conclusions. Results suggest the main barriers classification in five types: sociopolitical, technological, regulatory, financial, and human resources constraints. Results also suggest that beyond the waste management industry, projects have disadvantages added related to the same barriers inherent to others renewable energies initiatives. The STAR model sheds some light over the interactivity and dynamics related to the main constraints of the industry, describing the mutual influences and relationships among each one. Future researches are needed to better and comprehensively understand these relationships and ease the development of tools to alleviate or eliminate them. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. The Generalizability of Private Sector Research on Software Project Management in Two USAF Organizations: An Exploratory Study

    DTIC Science & Technology

    2003-03-01

    private sector . Researchers have also identified software acquisitions as one of the major differences between the private sector and public sector MIS. This indicates that the elements for a successful software project in the public sector may be different from the private sector . Private sector project success depends on many elements. Three of them are user interaction with the project’s development, critical success factors, and how the project manager prioritizes the traditional success criteria.

  3. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  4. Financial arrangement selection for energy management projects

    NASA Astrophysics Data System (ADS)

    Woodroof, Eric Aubrey

    Scope and method of study. The purpose of this study was to develop a model (E-FUND) to help facility managers select financial arrangements for energy management projects (EMPs). The model was developed with the help of a panel of expert financiers. The panel also helped develop a list of key objectives critical to the decision process. The E-FUND model was tested by a population of facility managers in four case studies. Findings and conclusions. The results may indicate that having a high economic benefit (from an EMP) is not overwhelmingly important, when compared to other qualitative objectives. The results may also indicate that the true lease and performance contract may be the most applicable financial arrangements for EMPs.

  5. Project Management as Related to Weapon Development in Navy Research and Development Organizations.

    DTIC Science & Technology

    of management . AGILE a current development program, is traced from inception to the present and unique management problems are discussed. The authors...evaluation is based on two standards of measurement: compliance with Department of Defense policy and conformance to generally accepted principles

  6. JICA -- working from the grass roots up. Vietnam.

    PubMed

    1997-11-01

    The fact that Japan has reduced its foreign aid by 10% for fiscal 1998 will require the Japan International Cooperation Agency's (JICA) Medical Cooperation Department (MCD) to review both the number of projects it funds and program management. The MCD is developing new guidelines for primary health care programs that will reflect the principles embedded in the Program of Action of the 1994 International Conference on Population and Development. The managing director of the MCD believes that an effective way to promote primary health care is to focus on reproductive health/family planning and then broaden the scope of activities. The current reproductive health project being implemented in Nghe An Province of Viet Nam is expected to make a great contribution to the improvement of community health. The MCD also wants to explore bottom-up primary health care approaches with the cooperation of nongovernmental organizations (NGOs). Thus, the Viet Nam project is being conducted in collaboration with the NGO JOICFP and may pioneer new avenues in governmental/NGO cooperation worldwide. The new budget cuts will force JICA to review its disbursement and project management procedures. Thus, all future projects will use the project cycle management approach, including the use of a participatory project design matrix. JICA will also be fostering a sense of ownership of projects from the grassroots to the national level that will allow projects to become sustainable.

  7. Native Youth Businesses: Native American Youth Entrepreneurship Projects.

    ERIC Educational Resources Information Center

    Children Today, 1994

    1994-01-01

    Describes five demonstration projects intended to stimulate innovative community approaches to developing entrepreneurial activities for Native American youth. Each of the projects is charged with meeting the community's need to train young persons with relevant entrepreneurial orientations and management skills to improve economic development.…

  8. Catchment Models and Management Tools for diffuse Contaminants (Sediment, Phosphorus and Pesticides): DIFFUSE Project

    NASA Astrophysics Data System (ADS)

    Mockler, Eva; Reaney, Simeon; Mellander, Per-Erik; Wade, Andrew; Collins, Adrian; Arheimer, Berit; Bruen, Michael

    2017-04-01

    The agricultural sector is the most common suspected source of nutrient pollution in Irish rivers. However, it is also often the most difficult source to characterise due to its predominantly diffuse nature. Particulate phosphorus in surface water and dissolved phosphorus in groundwater are of particular concern in Irish water bodies. Hence the further development of models and indices to assess diffuse sources of contaminants are required for use by the Irish Environmental Protection Agency (EPA) to provide support for river basin planning. Understanding connectivity in the landscape is a vital component of characterising the source-pathway-receptor relationships for water-borne contaminants, and hence is a priority in this research. The DIFFUSE Project will focus on connectivity modelling and incorporation of connectivity into sediment, nutrient and pesticide risk mapping. The Irish approach to understanding and managing natural water bodies has developed substantially in recent years assisted by outputs from multiple research projects, including modelling and analysis tools developed during the Pathways and CatchmentTools projects. These include the Pollution Impact Potential (PIP) maps, which are an example of research output that is used by the EPA to support catchment management. The PIP maps integrate an understanding of the pollution pressures and mobilisation pathways and, using the source-pathways-receptor model, provide a scientific basis for evaluation of mitigation measures. These maps indicate the potential risk posed by nitrate and phosphate from diffuse agricultural sources to surface and groundwater receptors and delineate critical source areas (CSAs) as a means of facilitating the targeting of mitigation measures. Building on this previous research, the DIFFUSE Project will develop revised and new catchment managements tools focused on connectivity, sediment, phosphorus and pesticides. The DIFFUSE project will strive to identify the state-of-the-art methods and models that are most applicable to Irish conditions and management challenges. All styles of modelling considered useful for water resources management are relevant to this project and a balance of technical sophistication, data availability and operational practicalities is the ultimate goal. Achievement of this objective will be measured by comparing the performance of the new models developed in the project with models used in other countries. The models and tools developed in the course of the project will be evaluated by comparison with Irish catchment data and with other state-of-the-art models in a model-inter-comparison workshop which will be open to other models and the wider research community.

  9. Prototype road weather performance management (RWPM) tool installation instructions & user manual.

    DOT National Transportation Integrated Search

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  10. Prototype road weather performance management tool : installation instructions & user manual.

    DOT National Transportation Integrated Search

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  11. IEC 61511 and the capital project process--a protective management system approach.

    PubMed

    Summers, Angela E

    2006-03-17

    This year, the process industry has reached an important milestone in process safety-the acceptance of an internationally recognized standard for safety instrumented systems (SIS). This standard, IEC 61511, documents good engineering practice for the assessment, design, operation, maintenance, and management of SISs. The foundation of the standard is established by several requirements in Part 1, Clauses 5-7, which cover the development of a management system aimed at ensuring that functional safety is achieved. The management system includes a quality assurance process for the entire SIS lifecycle, requiring the development of procedures, identification of resources and acquisition of tools. For maximum benefit, the deliverables and quality control checks required by the standard should be integrated into the capital project process, addressing safety, environmental, plant productivity, and asset protection. Industry has become inundated with a multitude of programs focusing on safety, quality, and cost performance. This paper introduces a protective management system, which builds upon the work process identified in IEC 61511. Typical capital project phases are integrated with the management system to yield one comprehensive program to efficiently manage process risk. Finally, the paper highlights areas where internal practices or guidelines should be developed to improve program performance and cost effectiveness.

  12. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Volunteer community service projects. 551...

  13. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  14. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  15. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  16. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  17. Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories

    NASA Astrophysics Data System (ADS)

    Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly

    The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.

  18. PMIS Project. Planning & Management Information System. A Project To Develop a Data Processing System for Support of the Planning and Management Needs of Local School Districts. Final Report, Year 2.

    ERIC Educational Resources Information Center

    Council of the Great City Schools, Washington, DC.

    This document examines the design and structure of PMIS (Planning and Management Information System), an information system that supports the decisionmaking process of executive management in local school districts. The system is designed around a comprehensive, longitudinal, and interrelated data base. It utilizes a powerful real-time,…

  19. Report: Acquisition Certifications Needed for Managers Overseeing Development of EPA’s Electronic Manifest System

    EPA Pesticide Factsheets

    Report #17-P-0029, November 7, 2016. Ineffective project oversight could cause project delays that prolong the EPA's ability to provide emergency responders with data about hazardous waste shipped between generators’ sites and waste management facilities.

  20. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  1. Managing hardwood-softwood mixtures for future forests in eastern North America: assessing suitability to projected climate change

    Treesearch

    John M. Kabrick; Kenneth L. Clark; Anthony W. D' Amato; Daniel C. Dey; Laura S. Kenefic; Christel C. Kern; Benjamin O. Knapp; David A. MacLean; Patricia Raymond; Justin D. Waskiewicz

    2017-01-01

    Despite growing interest in management strategies for climate change adaptation, there are few methods for assessing the ability of stands to endure or adapt to projected future climates. We developed a means for assigning climate "Compatibility" and "Adaptability" scores to stands for assessing the suitability of tree species for projected climate...

  2. Re-engineering Nascom's network management architecture

    NASA Technical Reports Server (NTRS)

    Drake, Brian C.; Messent, David

    1994-01-01

    The development of Nascom systems for ground communications began in 1958 with Project Vanguard. The low-speed systems (rates less than 9.6 Kbs) were developed following existing standards; but, there were no comparable standards for high-speed systems. As a result, these systems were developed using custom protocols and custom hardware. Technology has made enormous strides since the ground support systems were implemented. Standards for computer equipment, software, and high-speed communications exist and the performance of current workstations exceeds that of the mainframes used in the development of the ground systems. Nascom is in the process of upgrading its ground support systems and providing additional services. The Message Switching System (MSS), Communications Address Processor (CAP), and Multiplexer/Demultiplexer (MDM) Automated Control System (MACS) are all examples of Nascom systems developed using standards such as, X-windows, Motif, and Simple Network Management Protocol (SNMP). Also, the Earth Observing System (EOS) Communications (Ecom) project is stressing standards as an integral part of its network. The move towards standards has produced a reduction in development, maintenance, and interoperability costs, while providing operational quality improvement. The Facility and Resource Manager (FARM) project has been established to integrate the Nascom networks and systems into a common network management architecture. The maximization of standards and implementation of computer automation in the architecture will lead to continued cost reductions and increased operational efficiency. The first step has been to derive overall Nascom requirements and identify the functionality common to all the current management systems. The identification of these common functions will enable the reuse of processes in the management architecture and promote increased use of automation throughout the Nascom network. The MSS, CAP, MACS, and Ecom projects have indicated the potential value of commercial-off-the-shelf (COTS) and standards through reduced cost and high quality. The FARM will allow the application of the lessons learned from these projects to all future Nascom systems.

  3. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    NASA Astrophysics Data System (ADS)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  4. Health insurance and corporate social responsibility.

    PubMed

    Carter, Tony

    2009-01-01

    Innovation drives productivity in the nonprofit sector as well as in the commercial sector. The greatest advances come not from incremental improvements in efficiency but from new and better approaches. The most powerful way to create social value, therefore, is by developing a new means to address social problems and putting it into widespread practice. The expertise, research capacity, and reach that companies bring to philanthropy can help nonprofits create new solutions that they could never afford to develop on their own. Corporate managers sometimes work directly with faculty and community residents to implement local business projects. These projects often have significant societal benefits, especially since student collaboration and involvement extend to communities in many different inner cities. These projects are incredibly diverse and through such initiatives, management education not only provides an educationally rewarding outlet for students but also endows and enriches inner city communities. Management students sometimes work directly with faculty and community residents to implement local business projects. These projects often have significant societal benefits, especially since student collaboration and involvement extend to communities in many different inner cities. These projects are incredibly diverse and through such initiatives, management education not only provides an educationally rewarding outlet for students but also endows and enriches inner city communities. This article looks at how to use corporate social responsibility and service learning to drive innovation for local inner-city economic development.

  5. From shared care to disease management: key-influencing factors.

    PubMed

    Eijkelberg, I M; Spreeuwenberg, C; Mur-Veeman, I M; Wolffenbuttel, B H

    2001-01-01

    In order to improve the quality of care of chronically ill patients the traditional boundaries between primary and secondary care are questioned. To demolish these boundaries so-called 'shared care' projects have been initiated in which different ways of substitution of care are applied. When these projects end, disease management may offer a solution to expand the achieved co-operation between primary and secondary care. Answering the question: What key factors influence the development and implementation of shared care projects from a management perspective and how are they linked? The theoretical framework is based on the concept of the learning organisation. Reference point is a multiple case study that finally becomes a single case study. Data are collected by means of triangulation. The studied cases concern two interrelated Dutch shared care projects for type 2 diabetic patients, that in the end proceed as one disease management project. In these cases the predominant key-influencing factors appear to be the project management, commitment and local context, respectively. The factor project management directly links the latter two, albeit managing both appear prerequisites to its success. In practice this implies managing the factors' interdependency by the application of change strategies and tactics in a committed and skillful way. Project management, as the most important and active key factor, is advised to cope with the interrelationships of the influencing factors in a gradually more fundamental way by using strategies and tactics that enable learning processes. Then small-scale shared care projects may change into a disease management network at a large scale, which may yield the future blueprint to proceed.

  6. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  7. Vocational Curriculum Modification. Teaching Technical Language to Learning Handicapped Students. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 1.

    ERIC Educational Resources Information Center

    Gardner, David C.; And Others

    Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…

  8. Applying Project Histories and Project Learning through Knowledge Management in an Australian Construction Company

    ERIC Educational Resources Information Center

    Maqsood, Tayyab; Finegan, Andrew; Walker, Derek

    2006-01-01

    Purpose: With the advent of information and communication technologies (ICT), some organisations have endeavoured to develop and maintain systems commonly known as project histories. This paper aims to provide a framework to the construction organisations in order to improve the learning from projects through the development and use of project…

  9. Qualitative Phenomenological Examination of IT Project Management in Pharmaceutical Industry

    ERIC Educational Resources Information Center

    Ly, Phil

    2013-01-01

    The purpose of this study was to examine what caused IT projects to fail at a high rate in the pharmaceutical industry. IT projects failures delayed development of new drugs that can help save lives. It was imperative to evaluate what caused project failures because the collateral damage was delay in drug development. This qualitative…

  10. Chapter 13 - Perspectives on LANDFIRE Prototype Project Accuracy Assessment

    Treesearch

    James Vogelmann; Zhiliang Zhu; Jay Kost; Brian Tolk; Donald Ohlen

    2006-01-01

    The purpose of this chapter is to provide a general overview of the many aspects of accuracy assessment pertinent to the Landscape Fire and Resource Management Planning Tools Prototype Project (LANDFIRE Prototype Project). The LANDFIRE Prototype formed a large and complex research and development project with many broad-scale data sets and products developed throughout...

  11. The ID Database: Managing the Instructional Development Process

    ERIC Educational Resources Information Center

    Piña, Anthony A.; Sanford, Barry K.

    2017-01-01

    Management is evolving as a foundational domain to the field of instructional design and technology. However, there are few tools dedicated to the management of instructional design and development projects and activities. In this article, we describe the development, features and implementation of an instructional design database--built from a…

  12. Environmental Land Management in Tajikistan

    NASA Astrophysics Data System (ADS)

    Makhmudov, Zafar; Ergashev, Murod

    2015-04-01

    Tackling Environmental Land Management in Tajikistan "Project approach" Khayrullo Ibodzoda, Zafar Mahmoudov, Murod Ergashev, Kamoliddin Abdulloev Among 28 countries in Europe and Central Asia, Tajikistan is estimated to be the most vulnerable to the climate change impacts depending on its high exposure and sensitivity combined with a very low adaptive capacity. The agricultural sector of Tajikistan is subject to lower and more erratic rainfalls, as well as dryness of water resources due to the possible temperature rising in the region, high evaporation, reducing the accumulation of snow in the mountain glaciers and increased frequency of extreme events. Climate change and variability are likely to pose certain risks, especially for those who prefer natural agriculture or pasture management that just reinforces the need for sound, adapted to new climatic conditions and improved principles of land management. Adoption of new strategies and best practices on sustainable land and water management for agricultural ecosystems will help the farmers and communities in addressing the abovementioned problems, adapt and become more resilient to changing climate by increasing wellbeing of local population, and contributing to food security and restoring productive natural resources. The Environmental Land Management and Rural Livelihoods Project is being financed by the Pilot Program for Climate Resilience (PPCR) and Global Environment Facility (GEF). The Project goal is to enable the rural population to increase their productive assets by improving management of natural resources and building resilience to climate change in selected climate vulnerable sites. The project will facilitate introduction of innovative measures on land use and agricultural production by providing small grants at the village level and grants for the Pasture User Groups (PUGs) at jamoat level in order to implement joint plans of pasture management and wellbred livestock, also for the Water User Associations (WUAs) to introduce sustainable on-farm water management practices. The Project comprises three components to be implemented in five years: 1. Rural Production and Land Resource Management Investments; 2. Knowledge Management and Institutional Support, and 3. Project Management and Coordination. These components include a set of grants from the PPCR and GEF that betrays the particular importance of the grant sources for the Project funding. This innovative combination of the PPCR and GEF grant funding will help in scheduling a scope of work under the Project and enable to implement certain activities on a pilot basis that otherwise could not be implemented at this level. Key partners are the Committee for Environmental Protection (Implementing Agency), the Ministry of Finance, the PPCR Secretariat in Tajikistan, Farkhor, Kulyab, Khovaling, Baljuvan, Tavildara and Jirgatal districts, the German Agency for International Development (GIZ) with its GREAT program which provides additional support to the community-based Project planning and institutional development, as well as technical agricultural advisory services. Currently the project has Project Implementation Group and most of its Facilitating Organizations in place that will carry out financial management, disbursements, procurement process, environmental management, social development, monitoring and evaluation. Workshops on coordinating the Project were held in the districts, as well as a series of Trainings of trainings and meetings were conducted for specialists and technical personnel. Next step is to initiate supporting local initiatives for climate adaptive land management and improved livelihoods based on Community Action Plans.

  13. Process Acceptance and Adoption by IT Software Project Practitioners

    ERIC Educational Resources Information Center

    Guardado, Deana R.

    2012-01-01

    This study addresses the question of what factors determine acceptance and adoption of processes in the context of Information Technology (IT) software development projects. This specific context was selected because processes required for managing software development projects are less prescriptive than in other, more straightforward, IT…

  14. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    NASA Technical Reports Server (NTRS)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  15. Managing Risk Assessment in Science Departments.

    ERIC Educational Resources Information Center

    Forlin, Peter; Forlin, Chris

    1997-01-01

    Describes a health-and-safety risk-management audit in four Queensland, Australia high schools. One major outcome of this research project is the development of a comprehensive risk-management policy in compliance with the law. Other outcomes include the preparation of a professional-development package in risk-management policy for use as a…

  16. Using Construction Management for Public and Institutional Facilities.

    ERIC Educational Resources Information Center

    Public Technology, Inc., Washington, DC.

    Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…

  17. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  18. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    NASA Astrophysics Data System (ADS)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  19. Good governance and sustainability: a case study from Pakistan.

    PubMed

    Israr, Syed Muhammad; Islam, Anwar

    2006-01-01

    On the basis of a case study in Pakistan, the paper argues that good governance, characterized by transparency, accountability and meaningful community participation, plays a critical role in the sustainability of donor-funded health systems projects in the public health sector. The Family Health Project (FHP) (1992-1999), funded by the World Bank, has been used as a case study. Critical analysis of secondary data mainly obtained from the Department of Health (DoH) in the province of Sindh in Pakistan is the major tool used for the study. Data from other sources including the World Bank have also been used. The analysis reveals that the existing health care system could not fully absorb and sustain major "sociopolitical" thrusts of the project, meaningful community participation and "democratic" decision-making processes being the most important ones. The hierarchical structure and management process made it difficult to produce a sense of ownership of the project among all managers and the rank and file staff. The Provincial Health Development Center (PHDC) and District Health Development Centers (DHDCs) established by the FHP did not receive adequate financial and political support from DoH and the Ministry of Health to have much control of the project at the local level. Consequently, these Centers largely failed to institutionalize a continuing training program for district level health officials/professionals. Due to lack of political support, the District Health Management Teams (DHMTs) could not be institutionalized. Community participation in the DHMTs was symbolic rather than forceful. Improved coordination among all stakeholders, more stable and competent leadership, more meaningful community participation, greater devolution of project management to the district level, and better management of resources would have resulted in more effective and efficient implementation of the project. Based on these findings, the paper introduces a Sustainable Management Approach (SMA) as a tool that can be used to ensure the sustainability of health systems projects, particularly those funded by international organizations in developing countries. Good governance and a conducive organizational culture are important prerequisites for incorporating any new project within an existing system. This includes prior consensus building among all stakeholders, a meaningful and inclusive participatory planning, implementation and evaluation process involving communities, political commitment, and the identification and use of appropriate leadership for project management.

  20. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  1. Keep Talking & Monitoring: the importance of longitudinal research & community-based monitoring to support sustainable land management in southern Africa

    NASA Astrophysics Data System (ADS)

    Dougill, Andrew; Stringer, Lindsay

    2015-04-01

    Projects come and go with researchers, development practioners and government staff initiating new forms of community engagement in environmental monitoring and land management practices. We analyse interventions from Botswana and Swaziland and highlight that for benefits to be long-lived and lead to sustainable land management, requires community engagement in project design, implementation and for project outputs to be used in developing community-led environmental monitoring tools that can then help to guide local decision-making systems. We stress the vital importance of continued participatory engagement of researchers with community leaders and key government staff beyond the timeframe of their initial research such that longitudinal research approaches can realise significant benefits to all concerned. In dynamic (non-equilibrium) dryland environments, it is vitally important that research approaches address temporal and spatial variability by mapping patterns of change, using a range of participatory tools to enhance understandings of the causes of land degradation and the opportunities for shifts towards more sustainable land management. Decision-support tools, such as rangeland assessment guides produced for various Kalahari rangeland settings in Botswana (via a UNEP project and affiliated research), provide opportunities to support more sustainable land management. However, at present benefits are not being fully realised as project and research staff move on after projects end. Similarly, findings from mixed farming systems in Swaziland (assessing a JICA-funded project) show problems in maintaining new institutional structures to manage rangeland degradation, whilst issues on arable areas associated with parasitic weeds (Striga asiatica) remain problematic. Findings from longitudinal research in Swaziland also show that community understandings of environmental problems have evolved over 10 years and identify new problems associated with intensified drought events linked to climate change. Returning to communities (even if irregularly) after project completion enables identification of local-level knowledge and institutional problems that are often the underlying cause of the post-project failings. In many cases, such failings have led to a lack of sustained benefits as significant community-level goodwill and knowledge is developed during projects, but limited input and guidance through remaining institutional channels means that any strong grounding for success is not harnessed or sustained. It is vital that researchers work pro-actively with formal state institutions (notably agricultural extension services) to ensure that research and development project outputs are understood and used in the post-project phase. Continued engagement with local and institutional actors through longitudinal research assessing multi-stakeholder partnerships and local management practices can realise significant additional benefits far beyond the small time and cost implications of such continued engagement. Shifts to trans-disciplinary, multi-stakeholder working need to address the need for such longer-term, longitudinal research processes to ensure that benefits are not immediately lost and that new forms of sustainable land management can indeed be sustained.

  2. ADOPTING THE PROBLEM BASED LEARNING APPROACH IN A GIS PROJECT MANAGEMENT CLASS

    EPA Science Inventory

    Problem Based Learning (PBL) is a process that emphasizes the need for developing problem solving skills through hands-on project formulation and management. A class adopting the PBL method provides students with an environment to acquire necessary knowledge to encounter, unders...

  3. Making Childhood Asthma Management Education Happen in the Community: Translating Health Behavioral Research into Local Program.

    ERIC Educational Resources Information Center

    Krutzch, Christine B.; And Others

    1987-01-01

    A technology transfer project for getting initial community adoption of childhood asthma management programs is described. The evolution of the project, including development of programs, packaging considerations, establishment of partnerships, implementation, and evaluation are discussed. (Author/CH)

  4. A Writing-Intensive Program for Teaching Retail Management.

    ERIC Educational Resources Information Center

    Darian, Jean C.; And Others

    1992-01-01

    Presents the writing-intensive design for a retailing management course developed by its instructor in accordance with writing-across-the-curriculum principles. Provides an overview of the semester-long project. Details project procedures for preparatory activities, field research, and writing the marketing plan. (SR)

  5. Academic Leaders as Thermostats

    ERIC Educational Resources Information Center

    Kekale, Jouni

    2003-01-01

    University of Jones launched a two-year development and training project on academic management and leadership in the beginning of 2002. Open seminars were arranged for heads for departments, deans and administrative managers. In addition, personnel administration started pilot projects with two departments in co-operation with the Finnish…

  6. A cost-benefit analysis for materials management information systems.

    PubMed

    Slapak-Iacobelli, L; Wilde, A H

    1993-02-01

    The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.

  7. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    ERIC Educational Resources Information Center

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  8. 76 FR 3743 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... Demonstration Project, Department of the Army, Army Research, Development and Engineering Command, Armament Research, Development and Engineering Center (ARDEC); Notice #0;#0;Federal Register / Vol. 76 , No. 13... the Army, Army Research, Development and Engineering Command, Armament Research, Development and...

  9. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    NASA Technical Reports Server (NTRS)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  10. Voluntary Activities and Online Education for Digital Heritage Inventory Development after the Great East Japan Earthquake

    NASA Astrophysics Data System (ADS)

    Kondo, Y.; Uozu, T.; Seino, Y.; Ako, T.; Goda, Y.; Fujimoto, Y.; Yamaguchi, H.

    2013-07-01

    Consortium for Earthquake-Damaged Cultural Heritage (CEDACH) is a voluntary initiative launched just after the Great East Japan Earthquake on 11 March 2011. The consortium is developing a social network between local cultural resource managers restoring disaster-damaged cultural heritage on one side and remote researchers including historians, archaeologists and specialists of cultural information studies on the other side, in order to facilitate collaborative projects. This paper presents three projects in which CEDACH contributed to the development of a digital inventory for disaster-damaged heritage management through web-based collaborations by self-motivated workers. The first project, CEDACH GIS, developed an online archaeological site inventory for the disaster area. Although a number of individuals voluntarily participated in the project at the beginning, it gradually stagnated due to limited need for local rescue archaeology. However, the experience of online-based collaborations worked well for the second project proposed by local specialists, in which CEDACH restored the book catalogue of a tsunami-devastated research library. This experience highlighted the need for online education to improve information and communication technologies (ICT) skills of data builders. Therefore, in the third project called CEDACHeLi, an e-Learning management system was developed to facilitate learning the fundamental knowledge and techniques required for information processing in rescue operations of disaster-damaged cultural heritage. This system will contribute to improved skills and motivation of potential workers for further developments in digital heritage inventory.

  11. A framework for assessment and monitoring of small mammals in a lowland tropical forest.

    PubMed

    Solari, Sergio; Rodriguez, Juan José; Vivar, Elena; Velazco, Paul M

    2002-05-01

    Development projects in tropical forests can impact biodiversity. Assessment and monitoring programs based on the principles of adaptive management assist managers to identify and reduce such impacts. The small mammal community is one important component of a forest ecosystem that may be impacted by development projects. In 1996, a natural gas exploration project was initiated in a Peruvian rainforest. The Smithsonian Institution's Monitoring and Assessment of Biodiversity program cooperated with Shell Prospecting and Development Peru to establish an adaptive management program to protect the region's biodiversity. In this article, we discuss the role of assessing and monitoring small mammals in relation to the natural gas project. We outline the conceptual issues involved in establishing an assessment and monitoring program, including setting objectives, evaluating the results and making appropriate decisions. We also summarize the steps taken to implement the small mammal assessment, provide results from the assessment and discuss protocols to identify appropriate species for monitoring.

  12. Software Management Environment (SME) concepts and architecture, revision 1

    NASA Technical Reports Server (NTRS)

    Hendrick, Robert; Kistler, David; Valett, Jon

    1992-01-01

    This document presents the concepts and architecture of the Software Management Environment (SME), developed for the Software Engineering Branch of the Flight Dynamic Division (FDD) of GSFC. The SME provides an integrated set of experience-based management tools that can assist software development managers in managing and planning flight dynamics software development projects. This document provides a high-level description of the types of information required to implement such an automated management tool.

  13. Risk Management Model in Surface Exploitation of Mineral Deposits

    NASA Astrophysics Data System (ADS)

    Stojanović, Cvjetko

    2016-06-01

    Risk management is an integrative part of all types of project management. One of the main tasks of pre-investment studies and other project documentation is the tendency to protect investment projects as much as possible against investment risks. Therefore, the provision and regulation of risk information ensure the identification of the probability of the emergence of adverse events, their forms, causes and consequences, and provides a timely measures of protection against risks. This means that risk management involves a set of management methods and techniques used to reduce the possibility of realizing the adverse events and consequences and thus increase the possibilities of achieving the planned results with minimal losses. Investment in mining projects are of capital importance because they are very complex projects, therefore being very risky, because of the influence of internal and external factors and limitations arising from the socio-economic environment. Due to the lack of a risk management system, numerous organizations worldwide have suffered significant financial losses. Therefore, it is necessary for any organization to establish a risk management system as a structural element of system management system as a whole. This paper presents an approach to a Risk management model in the project of opening a surface coal mine, developed based on studies of extensive scientific literature and personal experiences of the author, and which, with certain modifications, may find use for any investment project, both in the mining industry as well as in investment projects in other areas.

  14. Wrap-up session

    NASA Technical Reports Server (NTRS)

    Holland, Geoffrey

    1992-01-01

    Listening to the case studies that were presented it became quite evident that the best data management systems were the ones where data managers and research scientists worked as a team developed in the early stages of project planning. Examples that were given included WOCE Data Assembly Centres e.g., Drifters, the Global Temperature Salinity Pilot Project (GTSPP) collaboration with Joint Analyses Centres in the U.S. and Australia, and JGOFS/BOFS development of Topical Centres. While each of these has some elements unique to the project, each had brought together 'teams' of Principal Investigators (PI's) and data management experts at an early stage of project development. Conversely, projects which had considered data management as a totally separate activity with lower priority often failed to provide the service required to meet scientific objectives. Therefore, the following actions should be brought to the attention of relevant groups within the IOC and other international organizations: (1) Publicize, at the national and international level, underway data/scientist collaborations that may be used as models in planning for the future. (2) Reduce adversarial situations where data managers and scientists appear to be in competition. (3) Colocation and other forms of collaboration often results in very high quality data sets and more timely data submission. Improved timeliness of data submissions was a common theme throughout the workshop and must be considered an important element in all future plans. Improvements in timely submission of data were noted. In order to continue this trend the advantages of timely submission of data must be stressed to those planning new ocean science projects.

  15. Framework for a comprehensive bridge management and information system.

    DOT National Transportation Integrated Search

    2011-11-01

    "The purpose of this research project was to provide a framework for the development of a Bridge : Management Information System (BMIS). Researchers developed a synthesis of current BMIS development : activities and identified sources of data availab...

  16. Convention Center Management: A Systems Analysis & Design Course Project

    ERIC Educational Resources Information Center

    Guidry, Brandi N.; Totaro, Michael W.

    2011-01-01

    A challenge faced by many instructors of systems analysis and design courses is the selection or development of projects that provide challenging, yet suitable, learning experiences for the students. Employing a system development project case in undergraduate MIS courses offers students a multitude of opportunities to experientially examine…

  17. Processes and process development in Taiwan

    NASA Technical Reports Server (NTRS)

    Hwang, H. L.

    1986-01-01

    Silicon material research in the Republic of China (ROC) parallels its development in the electronic industry. A brief outline of the historical development in ROC silicon material research is given. Emphasis is placed on the recent Silane Project managed by the National Science Council, ROC, including project objectives, task forces, and recent accomplishments. An introduction is also given to industrialization of the key technologies developed in this project.

  18. An Introduction to Flight Software Development: FSW Today, FSW 2010

    NASA Technical Reports Server (NTRS)

    Gouvela, John

    2004-01-01

    Experience and knowledge gained from ongoing maintenance of Space Shuttle Flight Software and new development projects including Cockpit Avionics Upgrade are applied to projected needs of the National Space Exploration Vision through Spiral 2. Lessons learned from these current activities are applied to create a sustainable, reliable model for development of critical software to support Project Constellation. This presentation introduces the technologies, methodologies, and infrastructure needed to produce and sustain high quality software. It will propose what is needed to support a Vision for Space Exploration that places demands on the innovation and productivity needed to support future space exploration. The technologies in use today within FSW development include tools that provide requirements tracking, integrated change management, modeling and simulation software. Specific challenges that have been met include the introduction and integration of Commercial Off the Shelf (COTS) Real Time Operating System for critical functions. Though technology prediction has proved to be imprecise, Project Constellation requirements will need continued integration of new technology with evolving methodologies and changing project infrastructure. Targets for continued technology investment are integrated health monitoring and management, self healing software, standard payload interfaces, autonomous operation, and improvements in training. Emulation of the target hardware will also allow significant streamlining of development and testing. The methodologies in use today for FSW development are object oriented UML design, iterative development using independent components, as well as rapid prototyping . In addition, Lean Six Sigma and CMMI play a critical role in the quality and efficiency of the workforce processes. Over the next six years, we expect these methodologies to merge with other improvements into a consolidated office culture with all processes being guided by automated office assistants. The infrastructure in use today includes strict software development and configuration management procedures, including strong control of resource management and critical skills coverage. This will evolve to a fully integrated staff organization with efficient and effective communication throughout all levels guided by a Mission-Systems Architecture framework with focus on risk management and attention toward inevitable product obsolescence. This infrastructure of computing equipment, software and processes will itself be subject to technological change and need for management of change and improvement,

  19. Risk assessment for construction projects of transport infrastructure objects

    NASA Astrophysics Data System (ADS)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  20. Best Practices from WisDOT Mega and ARRA Projects

    DOT National Transportation Integrated Search

    2012-03-01

    Since 2004 WisDOT has developed a number of new techniques, methods, processes and procedures for management of two new : types of transportation projects: Mega projects and projects funded through the American Recovery and Reinvestment Act of ...

  1. Best practices from WisDOT mega and ARRA projects.

    DOT National Transportation Integrated Search

    2012-03-01

    Since 2004 WisDOT has developed a number of new techniques, methods, processes and procedures for management of two new types of transportation projects: "Mega projects" and projects funded through the American Recovery and Reinvestment Act of 2009 (...

  2. Cultivating Leadership Development for Support Staff.

    ERIC Educational Resources Information Center

    Russell, Sharon

    1997-01-01

    Describes an urban school district's focus on leadership development for support staff. The project identified and trained 500 front-line supervisors representing office managers, food service managers, head custodians, and district maintenance supervisors. This paper explains program design, objectives, participants, management support, content,…

  3. Conceptualizing the cross-cultural gaps in managing international aid: HIV/AIDS and TB project delivery in Southern Africa.

    PubMed

    Jackson, Terence

    2011-01-01

    There appears to be a gap between the billions of dollars inputted into fighting HIV/AIDS and TB and outcomes. This in part can be attributed to the lack of attention in International Development to managing programmes and projects within complex levels of cross-cultural interactions. International Development often ignores management issues, yet Management Studies is left wanting through a lack of engagement with development issues including the fight against disease and poverty. This paper attempts to link these two disciplines towards mutual benefit, through a critical cross-cultural approach. It provides contextualization of international development policies/strategies; conceptualization of dominant paradigms; structural analysis of how a programme/project fits into the global governance structure; analysis of complexities and levels of cross-cultural interaction and their consequences and the process and implications of knowledge transfer across cultural distances. It concludes with implications for policy and practice, as well as what is needed from cross-disciplinary research. This includes how feedback loops can be strengthened from local to global, how indigenous knowledge may be better understood and integrated, how power relations within the global governance structure could be managed, how cross-cultural interaction could be better understood, and how knowledge transfer/sharing should be critically managed. Copyright © 2010 John Wiley & Sons, Ltd.

  4. Planning an adaptive management process for biodiversity conservation and resource development in the Camisea River Basin.

    PubMed

    Dallmeier, Francisco; Alonso, Alfonso; Jones, Murray

    2002-05-01

    The Smithsonian Institution's Monitoring and Assessment of Biodiversity Program joined Shell Prospecting and Development Peru (SPDP) to protect biodiversity during a natural gas exploration project. Emphasis was on long-term societal and environmental benefits in addition to financial gain for the company. The systematic, cyclical adaptive management process was used to generate feedback for SPDP managers. Adaptive management enables ongoing improvement of management policies and practices based on lessons learned from operational activities. Previous to this study, very little information about the local biodiversity was available. Over a 2-year period, the team conducted biological assessments of six taxonomic groups at five sites located within 600 km2. A broad range of management options such as location, timing and technology were developed from the beginning of the project. They were considered in conjunction with emerging lessons from the biodiversity assessments. Critical decisions included location of a gas plant and the cost of helicopter access versus roads to service the full field development. Both of these decisions were evaluated to ensure that they were economically and environmentally feasible. Project design changes, addressed in the planning stage, were accepted once consensus was achieved. Stakeholders were apprised of the implications of the baseline biodiversity assessments.

  5. Djeen (Database for Joomla!'s Extensible Engine): a research information management system for flexible multi-technology project administration.

    PubMed

    Stahl, Olivier; Duvergey, Hugo; Guille, Arnaud; Blondin, Fanny; Vecchio, Alexandre Del; Finetti, Pascal; Granjeaud, Samuel; Vigy, Oana; Bidaut, Ghislain

    2013-06-06

    With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. We developed Djeen (Database for Joomla!'s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group.Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material.

  6. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    NASA Technical Reports Server (NTRS)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  7. Djeen (Database for Joomla!’s Extensible Engine): a research information management system for flexible multi-technology project administration

    PubMed Central

    2013-01-01

    Background With the advance of post-genomic technologies, the need for tools to manage large scale data in biology becomes more pressing. This involves annotating and storing data securely, as well as granting permissions flexibly with several technologies (all array types, flow cytometry, proteomics) for collaborative work and data sharing. This task is not easily achieved with most systems available today. Findings We developed Djeen (Database for Joomla!’s Extensible Engine), a new Research Information Management System (RIMS) for collaborative projects. Djeen is a user-friendly application, designed to streamline data storage and annotation collaboratively. Its database model, kept simple, is compliant with most technologies and allows storing and managing of heterogeneous data with the same system. Advanced permissions are managed through different roles. Templates allow Minimum Information (MI) compliance. Conclusion Djeen allows managing project associated with heterogeneous data types while enforcing annotation integrity and minimum information. Projects are managed within a hierarchy and user permissions are finely-grained for each project, user and group. Djeen Component source code (version 1.5.1) and installation documentation are available under CeCILL license from http://sourceforge.net/projects/djeen/files and supplementary material. PMID:23742665

  8. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    NASA Astrophysics Data System (ADS)

    Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.

    2017-12-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.

  9. Project delivery in HIV/AIDS and TB in Southern Africa: the cross-cultural management imperative.

    PubMed

    Claeyé, Frederik; Jackson, Terence

    2011-01-01

    The purpose of this paper is to report the findings of a broad-based study that initially investigated a possible gap in global inputs into the fight against HIV/AIDS and TB co-infection, and outputs in terms of results achieved. It is proposed that such a gap may be hypothesized to be due, at least in part, to inappropriate management regimes within the global health governance structure. The research does not simply question the effectiveness of the management of programs and projects, but rather the inappropriateness resulting from the lack of addressing cross-cultural issues. The factors facilitating or hampering project service delivery were examined, by looking at 12 case studies in Botswana and South Africa. These data were complemented with seven semi-structured interviews with donor organizations and NGOs, conducted in the North. Cultural interactions were investigated by using the concept of "interfaces". The results suggest that there is a disjuncture between the global and local level that affects project delivery. The main issues hampering project outcomes can be summarized as systemic, structural and cultural. The article's main contributions are both theoretical, looking at global project delivery from a cross-cultural management perspective, as well as to development praxis by highlighting the need to focus more critically on cross-cultural management issues within the global health governance structure, and indeed within international development as a whole.

  10. Software Process Improvement Journey: IBM Australia Application Management Services

    DTIC Science & Technology

    2005-03-01

    learned from its successes and mistakes and then applied that learning to the next project . 28 CMU/SEI-2005-TR...worldwide re- quirements for project management and quality; it was the organization’s staff members who played a part in the development of the ...environ- ment and that it involves personnel from a variety of areas, ideally not part of the group that developed the technology or process

  11. MASTR-MS: a web-based collaborative laboratory information management system (LIMS) for metabolomics.

    PubMed

    Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew

    2017-01-01

    An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research community. It is freely available under the GNU GPL v3 licence and can be accessed from, https://muccg.github.io/mastr-ms/.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connor, Jason M.; McLellan, Jason G.; O'Connor, Dick

    In 1980, the United States Congress enacted the Northwest Power Planning and Conservation Act (PL 96-501, 1980), which established the Northwest Power Planning Council (NPPC). The NPPC was directed by Congress to develop a regional Power Plan and also the Columbia River Basin Fish and Wildlife Program (FWP) to restore or replace losses of fish caused by construction and operation of hydroelectric dams in the Columbia River Basin. In developing the FWP, Congress specifically directed NPPC to solicit recommendations for measures to be included in the Program from the region's fish and wildlife agencies and Indian tribes. All measures adoptedmore » by the Council were also required to be consistent with the management objectives of the agencies and tribes [Section 4.(h)(6)(A)], the legal rights of Indian tribes in the region [Section 4.(h)(6)(D)] and be based upon and supported by the best available scientific knowledge [Section 4.(h)(6)(B)]. The Resident Fish Stock Status above Chief Joseph and Grand Coulee Dams Project, also known as the Joint Stock Assessment Project (JSAP) specifically addresses NPPC Council measure 10.8B.26 of the 1994 program. The Joint Stock Assessment Project is a management tool using ecosystem principles to manage artificial fish assemblages and native fish in altered environments existing in the Columbia River System above Chief Joseph and Grand Coulee Dams (Blocked Area). A three-phase approach of this project will enhance the fisheries resources of the Blocked Area by identifying data gaps, filling data gaps with research, and implementing management recommendations based on research results. The Blocked Area fisheries information is housed in a central location, allowing managers to view the entire system while making decisions, rather than basing management decisions on isolated portions of the system. The JSAP is designed and guided jointly by fisheries managers in the Blocked Area and the Columbia Basin Blocked Area Management Plan (1998). The initial year of the project (1997) identified the need for a central data storage and analysis facility, coordination with the StreamNet project, compilation of Blocked Area fisheries information, and a report on the ecological condition of the Spokane River System. These needs were addressed in 1998 by acquiring a central location with a data storage and analysis system, coordinating a pilot project with StreamNet, compiling fisheries distribution data throughout the Blocked Area, identifying data gaps based on compiled information, and researching the ecological condition of the Spokane River. In order to ensure that any additional information collected throughout the life of this project will be easily stored and manipulated by the central storage facility, it was necessary to develop standardized methodologies between the JSAP fisheries managers. Common collection and analytical methodologies were developed in 1999. In 1999, 2000, and 2001 the project began addressing some of the identified data gaps throughout the Blocked Area. Data collection of established projects and a variety of newly developed sampling projects are ongoing. Projects developed and undertaken by JSAP fisheries managers include investigations of the Pend Orielle River and its tributaries, the Little Spokane River and its tributaries, and water bodies within and near the Spokane Indian Reservation. Migration patterns of adfluvial and reservoir fish in Box Canyon Reservoir and its tributaries, a baseline assessment of Boundary Reservoir and its tributaries, ecological assessment of mountain lakes in Pend Oreille County, and assessments of seven streams and four lakes on the Spokane Indian Reservation were completed by 2000. Assessments of the Little Spokane River and its tributaries, tributaries to the Pend Oreille River, small lakes in southern Pend Oreille County, and water bodies within and near the Spokane Indian Reservation were conducted in 2001. This work was done in accordance with the scope of work approved by Bonneville Power Administration (BPA).« less

  13. Conjunctive management of surface and groundwater resources under projected future climate change scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mani, Amir; Tsai, Frank T. -C.; Kao, Shih-Chieh

    Our study introduces a mixed integer linear fractional programming (MILFP) method to optimize conjunctive use of future surface water and groundwater resources under projected climate change scenarios. The conjunctive management model maximizes the ratio of groundwater usage to reservoir water usage. Future inflows to the reservoirs were estimated from the future runoffs projected through hydroclimate modeling considering the Variable Infiltration Capacity model, and 11 sets of downscaled Coupled Model Intercomparison Project phase 5 global climate model projections. Bayesian model averaging was adopted to quantify uncertainty in future runoff projections and reservoir inflow projections due to uncertain future climate projections. Optimizedmore » conjunctive management solutions were investigated for a water supply network in northern Louisiana which includes the Sparta aquifer. Runoff projections under climate change scenarios indicate that runoff will likely decrease in winter and increase in other seasons. Ultimately, results from the developed conjunctive management model with MILFP indicate that the future reservoir water, even at 2.5% low inflow cumulative probability level, could counterbalance groundwater pumping reduction to satisfy demands while improving the Sparta aquifer through conditional groundwater head constraint.« less

  14. Conjunctive management of surface and groundwater resources under projected future climate change scenarios

    DOE PAGES

    Mani, Amir; Tsai, Frank T. -C.; Kao, Shih-Chieh; ...

    2016-06-16

    Our study introduces a mixed integer linear fractional programming (MILFP) method to optimize conjunctive use of future surface water and groundwater resources under projected climate change scenarios. The conjunctive management model maximizes the ratio of groundwater usage to reservoir water usage. Future inflows to the reservoirs were estimated from the future runoffs projected through hydroclimate modeling considering the Variable Infiltration Capacity model, and 11 sets of downscaled Coupled Model Intercomparison Project phase 5 global climate model projections. Bayesian model averaging was adopted to quantify uncertainty in future runoff projections and reservoir inflow projections due to uncertain future climate projections. Optimizedmore » conjunctive management solutions were investigated for a water supply network in northern Louisiana which includes the Sparta aquifer. Runoff projections under climate change scenarios indicate that runoff will likely decrease in winter and increase in other seasons. Ultimately, results from the developed conjunctive management model with MILFP indicate that the future reservoir water, even at 2.5% low inflow cumulative probability level, could counterbalance groundwater pumping reduction to satisfy demands while improving the Sparta aquifer through conditional groundwater head constraint.« less

  15. Management of Globally Distributed Software Development Projects in Multiple-Vendor Constellations

    NASA Astrophysics Data System (ADS)

    Schott, Katharina; Beck, Roman; Gregory, Robert Wayne

    Global information systems development outsourcing is an apparent trend that is expected to continue in the foreseeable future. Thereby, IS-related services are not only increasingly provided from different geographical sites simultaneously but beyond that from multiple service providers based in different countries. The purpose of this paper is to understand how the involvement of multiple service providers affects the management of the globally distributed information systems development projects. As research on this topic is scarce, we applied an exploratory in-depth single-case study design as research approach. The case we analyzed comprises a global software development outsourcing project initiated by a German bank together with several globally distributed vendors. For data collection and data analysis we have adopted techniques suggested by the grounded theory method. Whereas the extant literature points out the increased management overhead associated with multi-sourcing, the analysis of our case suggests that the required effort for managing global outsourcing projects with multiple vendors depends among other things on the maturation level of the cooperation within the vendor portfolio. Furthermore, our data indicate that this interplay maturity is positively impacted through knowledge about the client that has been derived based on already existing client-vendor relationships. The paper concludes by offering theoretical and practical implications.

  16. Reaching for the APEX at Ames

    NASA Technical Reports Server (NTRS)

    Kohut, Matthew

    2008-01-01

    The multidimensional design of the APEX program is the result of an extensive research and development effort dating back nearly a decade. "In the late 1990s and early 2000, we were pretty successful at getting new research and technology projects here at the center," Johnson says, "and we had a lack of critical mass of project managers. We were taking people who were primarily researchers and putting them in the position of managing projects." Smith and Johnson held a series of workshops across the center during 2000 and 2001 to gather feedback about how to address this issue. When they briefed the center's senior management on their findings, one of the top recommendations was to establish a project manager development program at Ames. At that point, they cast a wide net for ideas and information. "We did centerwide needs assessment, we did focus groups, we did surveys," Smith says. "We came up with a proposal for what a program would look like, tying in what we knew about the Academy of Program1 Project Leadership (now the Academy for Program/Project and Engineering Leadership, or APPEL), what we've seen at other centers, what other centers have tried. We were always checking to make sure our program mapped to APPEL. We also looked at the PMI [Project Management Institute] model, INCOSE [International Council on Systems Engineering], CMMI [Capability Maturity Model Integration], you name it." "We had a lot of conversations with the Jet Propulsion Lab and Goddard," Johnson adds. "We saw those centers as models for what Ames was aspiring to be in terms of a center for managing space flight missions." Their research confirmed what they already knew-that strong practitioner involvement would be critical to their program design process. 'XPEX is for the practitioner by the practitioner," Smith says. "They have to be a part of designing it. Otherwise there's no way we could design a program that meets their needs." At the same time that they worked at the grassroots level, they also solicited feedback from the center's senior management. "We recognized that in order for anything to succeed here, we needed to have a champion at the center management level," Johnson said. "You have to have champions, and you have to listen to what the senior managers are saying. They have their own ideas." In the case of APEX, one of those ideas fundamentally reshaped the program. "When we originally started, it was a project management development program," Johnson says, "but in our meeting with our center director, he said, 'Project management is important, but we also need to strengthen our systems engineering.' So we basically added that component to the program based on what he wanted."

  17. Project officer's perspective: quality assurance as a management tool.

    PubMed

    Heiby, J

    1993-06-01

    Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.

  18. Managing In-House Development of a Campus-Wide Information System

    ERIC Educational Resources Information Center

    Shurville, Simon; Williams, John

    2005-01-01

    Purpose: To show how a combination of hard and soft project and change management methodologies guided successful in-house development of a campus-wide information system. Design/methodology/approach: A case study of the methodologies and management structures that guided the development is presented. Findings: Applying a combination of the…

  19. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  20. 12 CFR 1261.6 - Nominations for member and independent directorships.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... areas: auditing and accounting, derivatives, financial management, organizational management, project development, risk management practices, and the law. Before nominating any individual for an independent...

  1. 12 CFR 1261.9 - Actions affecting director elections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... auditing and accounting, derivatives, financial management, organizational management, project development, risk management practices, or the law , it may identify those qualifications and so inform the members...

  2. Cultural differences in Research project management

    NASA Astrophysics Data System (ADS)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  3. Project Plan for Recreation Resources Development. North Hartland Lake, Hartland and Hartford, Vermont.

    DTIC Science & Technology

    1981-01-01

    of reservoir management are included within the scope of thle project plan. The plan represents a culmination of knowledge gathered from past...a detailed inventory and analysis of the projects natural resources in order to minimize environment and aesthetic impact, promote logical development...and minimize development costs. Factors inventoried included soil types, vegetation, topography, wildlife, surface geology, historical

  4. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    NASA Astrophysics Data System (ADS)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  5. From shared care to disease management: key-influencing factors

    PubMed Central

    Eijkelberg, Irmgard M.J.G.; Spreeuwenberg, Cor; Mur-Veeman, Ingrid M.; Wolffenbuttel, Bruce H.R.

    2001-01-01

    Abstract Background In order to improve the quality of care of chronically ill patients the traditional boundaries between primary and secondary care are questioned. To demolish these boundaries so-called ‘shared care’ projects have been initiated in which different ways of substitution of care are applied. When these projects end, disease management may offer a solution to expand the achieved co-operation between primary and secondary care. Objective Answering the question: What key factors influence the development and implementation of shared care projects from a management perspective and how are they linked? Theory The theoretical framework is based on the concept of the learning organisation. Design Reference point is a multiple case study that finally becomes a single case study. Data are collected by means of triangulation. The studied cases concern two interrelated Dutch shared care projects for type 2 diabetic patients, that in the end proceed as one disease management project. Results In these cases the predominant key-influencing factors appear to be the project management, commitment and local context, respectively. The factor project management directly links the latter two, albeit managing both appear prerequisites to its success. In practice this implies managing the factors' interdependency by the application of change strategies and tactics in a committed and skilful way. Conclusion Project management, as the most important and active key factor, is advised to cope with the interrelationships of the influencing factors in a gradually more fundamental way by using strategies and tactics that enable learning processes. Then small-scale shared care projects may change into a disease management network at a large scale, which may yield the future blueprint to proceed. PMID:16896415

  6. Construction manpower management system.

    DOT National Transportation Integrated Search

    1990-01-01

    This report traces the development of and explains the operation of a Construction Manpower Management System (CMMS) developed for the Virginia Department of Transportation (VDOT). Initial direction for this project was received from the Construction...

  7. 42 CFR 56.603 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of acute pain and suffering for medical emergencies, when provision of such services is necessary to...) Develop management and control systems which are in accordance with sound financial management procedures... (e) of this section. (g) Develop an overall financial management plan and an operating budget for the...

  8. 42 CFR 56.603 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of acute pain and suffering for medical emergencies, when provision of such services is necessary to...) Develop management and control systems which are in accordance with sound financial management procedures... (e) of this section. (g) Develop an overall financial management plan and an operating budget for the...

  9. 42 CFR 56.603 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of acute pain and suffering for medical emergencies, when provision of such services is necessary to...) Develop management and control systems which are in accordance with sound financial management procedures... (e) of this section. (g) Develop an overall financial management plan and an operating budget for the...

  10. A Metadata Element Set for Project Documentation

    NASA Technical Reports Server (NTRS)

    Hodge, Gail; Templeton, Clay; Allen, Robert B.

    2003-01-01

    Abstract NASA Goddard Space Flight Center is a large engineering enterprise with many projects. We describe our efforts to develop standard metadata sets across project documentation which we term the "Goddard Core". We also address broader issues for project management metadata.

  11. Non-Algorithmic Issues in Automated Computational Mechanics

    DTIC Science & Technology

    1991-04-30

    Tworzydlo, Senior Research Engineer and Manager of Advanced Projects Group I. Professor I J. T. Oden, President and Senior Scientist of COMCO, was project...practical applications of the systems reported so far is due to the extremely arduous and complex development and management of a realistic knowledge base...software, designed to effectively implement deep, algorithmic knowledge, * and 0 "intelligent" software, designed to manage shallow, heuristic

  12. The Forest Service, Rocky Mountain Research Station's Southwestern Borderlands Ecosystem Management Project: building on 10 years of success

    Treesearch

    Gerald J. Gottfried; Carleton B. Edminster

    2005-01-01

    The USDA Forest Service’s Southwestern Borderlands Ecosystem Management Project mission is to contribute to the scientific basis for developing and implementing a comprehensive ecosystem management plan to restore natural processes, improve the productivity and biological diversity of grasslands and woodlands, and sustain an open landscape with a viable rural economy...

  13. Remote sensing in Michigan for land resource management

    NASA Technical Reports Server (NTRS)

    Sattinger, I. J.

    1972-01-01

    This project to demonstrate the application of earth resource survey technology to current problems in Michigan was undertaken jointly by the Environmental Research Institute of Michigan and Michigan State University. Remote sensing techniques were employed to advantage in providing management information for the Pointe Mouillee State Game Area and preparing an impact assessment in advance of the projected construction of the M-14 freeway from Ann Arbor to Plymouth, Michigan. The project also assisted the state government in its current effort to develop and implement a state-wide land management plan.

  14. SKA Telescope Manager (TM): status and architecture overview

    NASA Astrophysics Data System (ADS)

    Natarajan, Swaminathan; Barbosa, Domingos; Barraca, Joao P.; Bridger, Alan; Choudhury, Subhrojyoti R.; Di Carlo, Matteo; Dolci, Mauro; Gupta, Yashwant; Guzman, Juan; Van den Heever, Lize; Le Roux, Gerhard; Nicol, Mark; Patil, Mangesh; Smareglia, Riccardo; Swart, Paul; Thompson, Roger; Vrcic, Sonja; Williams, Stewart

    2016-07-01

    The SKA radio telescope project is building two telescopes, SKA-Low in Australia and SKA-Mid in South Africa respectively. The Telescope Manager is responsible for the observations lifecycle and for monitoring and control of each instrument, and is being developed by an international consortium. The project is currently in the design phase, with the Preliminary Design Review having been successfully completed, along with re-baselining to match project scope to available budget. This report presents the status of the Telescope Manager work, key architectural challenges and our approach to addressing them.

  15. Towards a Participatory Strategy for Integrated Rural Development.

    ERIC Educational Resources Information Center

    Lowdermilk, Max; Laitos, W. Robert

    1981-01-01

    Details essential elements of any rural development program, describes a seven-stage project development strategy which has proved successful in water management projects in Pakistan and Egypt, delineates the key concepts in each of the seven stages, and recommends integration of the client system into rural development programs. (Author)

  16. Development of a Total Energy, Environment and Asset Management (TE2AM tm) Curriculum

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Leary, Phillip R.

    2012-12-31

    The University of Wisconsin Department of Engineering Professional Development (EPD) has completed the sponsored project entitled, Development of a Total Energy, Environment and Asset Management (TE2AM) Curriculum. The project involved the development of a structured professional development program to improve the knowledge, skills, capabilities, and competencies of engineers and operators of commercial buildings. TE2AM advances a radically different approach to commercial building design, operation, maintenance, and end of life disposition. By employing asset management principles to the lifecycle of a commercial building, owners and occupants will realize improved building performance, reduced energy consumption and positive environmental impacts. Through our commercializationmore » plan, we intend to offer TE2AM courses and certificates to the professional community and continuously improve TE2AM course materials. The TE2AM project supports the DOE Strategic Theme 1 Energy Security; and will further advance the DOE Strategic Goal 1.4 Energy Productivity. Through participation in the TE2AM curriculum, engineers and operators of commercial buildings will be eligible for a professional certificate; denoting the completion of a prescribed series of learning activities. The project involved a comprehensive, rigorous approach to curriculum development, and accomplished the following goals: 1. Identify, analyze and prioritize key learning needs of engineers, architects and technical professionals as operators of commercial buildings. 2. Design and develop TE2AM curricula and instructional strategies to meet learning needs of the target learning community. 3. Establish partnerships with the sponsor and key stakeholders to enhance the development and delivery of learning programs. 4. Successfully commercialize and sustain the training and certificate programs for a substantial time following the term of the award. The project team was successful in achieving the goals and deliverables set forth in the original proposal. Though attempts were made to adhere to the original project timeline, the team requested, and was granted a 6 month project extension, during which time the project was completed.« less

  17. A Glossary of Terms Used by the Educational Management Project.

    ERIC Educational Resources Information Center

    Tucson Public Schools, AZ.

    This publication defines and illustrates approximately 80 terms and concepts that are crucial to understanding the Educational Management Project, a comprehensive inservice program for educational administrators that was developed by the Tucson Public Schools. Annotations for the individual terms vary in length from approximately 30 to 350 words…

  18. Conscientious Consumerism Project in an Undergraduate Quality Management Class

    ERIC Educational Resources Information Center

    Helms, Marilyn M.

    2014-01-01

    This article describes a "conscientious consumerism" project that involves the student as the consumer to either commend or complain to a company about a recent product or service experience. This activity and presentation helps students develop an understanding of the commendation/complaint management process within organizations while…

  19. Developing Instructional Technology Products Using Effective Project Management Practices

    ERIC Educational Resources Information Center

    Allen, Stephanie; Hardin, Paul C.

    2008-01-01

    Delivering a successful instructional technology (IT) product depends on more than just having an extremely creative instructional solution or following an instructional systems design (ISD) model. Proper planning, direction, and execution of the project are require, as well. We present a model of management that encompasses the ISD process. Five…

  20. Project Management Approaches for Online Learning Design

    ERIC Educational Resources Information Center

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  1. Development of uniform sections for pavement management system inventory and application : interim report.

    DOT National Transportation Integrated Search

    2007-12-01

    This report summarizes the findings of the first phase of LTRC research project 04-2P, which is sponsored by LADOTD. The project is assessing the current status and the state-of-the-practice of the LADOTD pavement management system (PMS). Results of ...

  2. Towards Better Student Tracking Systems.

    ERIC Educational Resources Information Center

    Further Education Development Agency, London (England).

    The Further Education (FE) sector in the United Kingdom has devoted time, energy, and resources in recent years to the development and improvement of information systems known as management-information systems. This report presents the findings of a research project on the use of management-information systems in student tracking. The project was…

  3. COMPETITIVE BROWNFIELD REDEVELOPMENT - PROJECT MANAGEMENT AND MARKETING STRATEGIES (CD 2 OF 6)

    EPA Science Inventory

    The goal of this interactive CD is to inform urban planners and State and Federal Brownfield development personnel of new and innovative project management and marketing strategies related to brownfield activities. To order this CD by email: www.epa.gov/ncepi/ or phone 1-800-490-...

  4. 2002 Report to Congress: Evaluating the Consensus Best Practices Developed through the Howard Hughes Medical Institute’s Collaborative Hazardous Waste Management Demonstration Project

    EPA Pesticide Factsheets

    This report discusses a collaborative project initiated by the Howard Hughes Medical Institute (HHMI) to establish and evaluate a performance-based approach to management of hazardous wastes in the laboratories of academic research institutions.

  5. Engineering and management experience at Texas A&M Transportation Institute

    NASA Astrophysics Data System (ADS)

    Chowdhury, Arif Tahjibul

    This manuscript presents the author's engineering and management experience during his internship in the Materials and Pavements (M&P) Division at the Texas A&M Transportation Institute (TTI), and is a record of study for the Doctor of Engineering at Texas A&M University. Through this internship, he met his established internship objectives of gaining technical knowledge as well as knowledge and skills in project management, organizational communication, and quality management of pavement condition data, and of attaining professional development. In meeting these objectives, the author describes the history, mission, and organizational structure of his workplace. He also presents his experience of developing and delivering a two-week training course on pavement design and construction in Kosovo. Participating in a number of professional development training courses and other activities prepared him for working as an engineering manager. These activities include Delta-T leadership training, an instructor development course, a time management and organizational skills course, and the M&P Division lecture series. Leadership and skills learned through the Delta-T program were beneficial for the employee as well as the employer. For the class project, the author and his teammates performed a study dealing with improving TTI's deliverables. The Delta-T team composed a report summarizing their efforts of examining the current state of TTI's project deliverables, the deliverables' shortcomings, and potential enhancements to expand the deliverables' appeal to additional types of potential users outside the traditional research community. The team also developed a prototype web-based model of deliverables and presented some implementation recommendations. Participating in the Texas Department of Transportation's (TxDOT's) pavement surface distress data collection program enabled the author to become familiar with pavement distress data quality management and thus attain the technical and nontechnical skills required for project management. He noticed some areas for improvement in TxDOT's rater's manual, rater's training class, and acceptance criteria for visual distress data.

  6. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    NASA Astrophysics Data System (ADS)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should complement the current system, by creating permanent, sustained options for interactions between large research projects in similar fields. In the long run such a centre might improve on the host-based system because the centre-based solution allows multiple projects to be coordinated in conjunction by experienced science managers, using overlap in meeting organization, reporting, infrastructure, travel and so on. To still maintain close cooperation between project managers and lead PIs, we envision a virtual centre that creates extensive collaborative opportunities by organizing yearly retreats, a shared technical data base, et cetera. As "CESSMA" is work in progress (we have applied for funding for 2016-18), we would like to use this opportunity to discuss chances, potential problems, experiences and options for this attempt to institutionalise the very reason for this session: improved, coordinated, effective science coordination; and to create a central focal point for public / academia interactions.

  7. Mind the Gap: furthering the development of an international collaboration in marine data management

    NASA Astrophysics Data System (ADS)

    Glaves, Helen; Miller, Stephen; Proctor, Roger; Schaap, Dick

    2013-04-01

    A large and ever increasing amount of marine data is available throughout Europe, USA, Australia and beyond. The challenges associated with the acquisition of this data mean that the cost of collection is high and the data itself often irreplaceable. At a time when the demand for marine data is growing while financial resources for its collection are being dramatically reduced the need to maximise its re-use is becoming a priority for marine data managers. A number of barriers to the re-use of marine data currently exist due to the various formats, standards, vocabularies etc. used by the organisations engaged in collecting and managing this data. These challenges are already being addressed at a regional level by projects in Europe (Geo-Seas, SeaDataNet etc.), USA (R2R) and Australia (IMOS). To expand these projects further and bridge the gap between these regional initiatives the Ocean Data Interoperability Platform (ODIP) will establish a collaborative platform which will facilitate the development of a common approach to marine data management. Proactive dissemination of the outcomes and products of this project will promote adoption of the common standards and practices developed by the ODIP project to other organisations and regions beyond the 20 original consortium partners. To demonstrate this coordinated approach several joint prototypes will be developed to test and evaluate potential solutions for solving the marine data management issues identified within the different marine. These prototypes will also be used to illustrate the effective sharing of data across scientific domains, organisations and international boundaries through the development of common practices and standards in marine data management.

  8. Mind the Gap: furthering the development of an international collaboration in marine data management

    NASA Astrophysics Data System (ADS)

    Glaves, H. M.; Miller, S. P.; Proctor, R.; Schaap, D.

    2012-12-01

    A large and ever increasing amount of marine data is available throughout Europe, USA, Australia and beyond. The challenges associated with the acquisition of this data mean that the cost of collection is high and the data itself often irreplaceable. At a time when the demand for marine data is growing while financial resources for its collection are being dramatically reduced the need to maximise its re-use is becoming a priority for marine data managers. A number of barriers to the re-use of marine data currently exist due to the various formats, standards, vocabularies etc. used by the organisations engaged in collecting and managing this data. These challenges are already being addressed at a regional level by projects in Europe (Geo-Seas, SeaDataNet etc.), USA (R2R) and Australia (IMOS). To expand these projects further and bridge the gap between these regional initiatives the Ocean Data Interoperability Platform (ODIP) will establish a collaborative platform which will facilitate the development of a common approach to marine data management. Proactive dissemination of the outcomes and products of this project will promote adoption of the common standards and practices developed by the ODIP project to other organisations and regions beyond the 20 original consortium partners. To demonstrate this coordinated approach several joint prototypes will be developed to test and evaluate potential solutions for solving the marine data management issues identified within the different marine disciplines. These prototypes will also be used to illustrate the effective sharing of data across scientific domains, organisations and international boundaries through the development of common practices and standards in marine data management.

  9. Importance of bottom-up approach in water management - sustainable development of catchment areas in Croatia

    NASA Astrophysics Data System (ADS)

    Pavic, M.; Cosic-Flajsig, G.; Petricec, M.; Blazevic, Z.

    2012-04-01

    Association for preservation of Croatian waters and sea SLAP is a non-governmental organization (NGO) that gathers more than 150 scientist, hydrologist and civil engineers. SLAP has been established in 2006 and since then had organized many conferences and participated in projects dealing with water management. We have started our work developing plans to secure water supply to the 22 (21) villages in the rural parts of Dubrovnik (Pozega) area and trough the years we have accumulated knowledge and experience in dealing with stakeholders in hydrology and water management. Within this paper we will present importance of bottom-up approach to the stakeholders in water management in Croatia on two case studies: (1) Management of River Trebizat catchment area - irrigation of the Imotsko-Bekijsko rural parts; (2) Development of multipurpose water reservoirs at the River Orljava catchment area. Both projects were designed in the mid and late 1980's but due to the war were forgotten and on halt. River Trebizat meanders between Croatia and Bosnia and Herzegovina and acquires joint management by both countries. In 2010 and 2011 SLAP has organized conferences in both countries gathering all the relevant stakeholders from representatives of local and state governments, water management companies and development agencies to the scientist and interested NGO's. The conferences gave firm scientific background of the topic including presentation of all previous studies and measurements as well as model results but presented in manner appropriate to the stakeholders. The main result of the conference was contribution to the development of joint cross-border project sent to the EU Pre-Accession funds in December 2011 with the aim to strengthen capacities of both countries and prepare larger project dealing with management of the whole Trebizat catchment area to EU structural funds once Croatia enters EU in 2013. Similar approach was taken for the Orljava catchment in the northern Croatia. Construction of multipurpose water storage KAMENSKA with capacity of about 45 million cubic meters per year was planned in 1984 but the project was postponed due to the war activities and never realized. None the less, the need for Kamenska is great. Orljava river basin, tributary of river Sava, has great significance for the Posavina area and wider area of Pozega. Improvements in water supply, flood control, irrigation and renewable hydro energy are not possible without new management of river Orljava basin. On round table in Pozega in October 2011 we have managed to gather all the relevant stakeholders including regional governor, directors of Croatian waters (state owned water management company), representatives of ministries and regional development agencies. The result was revitalization of the Kamenska multipurpose water storage project and inclusion in the Croatian waters and regional plans for 2012. Both examples stress the importance of the bottom-up approach to the stakeholders in the water management and give the way how scientific research can be transmitted to the decision making establishment trough organization of public events.

  10. Control Systems for Information Systems Development Projects (Part I)

    ERIC Educational Resources Information Center

    Dickson, Gary W.

    1970-01-01

    Discusses control of management information systems and finds a similarity in management of research and development activity. Part II will appear in AEDS Journal, Volume 4, number 2, December 1970. (JF)

  11. Migrant Education Administrative Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    Relating specifically to the North Carolina migrant education program's administrative responsibilities, this guide is designed to aid administrators in program management, monitoring project activities, project evaluation, self-assessment, determining needs for training and staff development, site-visit preparation, policy development, and…

  12. Learning from Experience--How Development Projects Spread "Good Practice" in Britain.

    ERIC Educational Resources Information Center

    Clynes, Roger

    1992-01-01

    Architects and Buildings Branch (A&B) of Department of Education in London, England, is specifically responsible for design and management of educational facilities. Current development project provides example of emphasis, aims, methods of work, and outcome of a typical project. Fact file on British public schools and list of type of reports…

  13. 77 FR 46516 - Notice of Availability of the Final Environmental Impact Statement, Including a Programmatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... Groundwater Development Project, Nevada AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... White Pine Counties Groundwater Development Project (SNWA Project), and by this notice is announcing the... Drive, Las Vegas Libraries in Nevada: Nevada State Library, 100 N. Stewart St., Carson City White Pine...

  14. The Feasibility of Determining Success Criteria for Educational Research and Development Projects.

    ERIC Educational Resources Information Center

    Ball, Rodney J.; Cook, Desmond L.

    The determination of final success of educational research and development projects is an important problem for those concerned with project management and evaluation. The purpose of this study was twofold: (a) to determine if schedule, cost, quality/performance, follow-on work, spin-off benefits, and customer/client satisfaction were given a…

  15. DEVELOPMENT OF A CONTAMINANT TRANSPORT AND FATE MASS BALANCE CALIBRATION MODEL FOR LAKE MICHIGAN MASS BALANCE PROJECT (LMMBP)

    EPA Science Inventory

    Lake Michigan Mass Balance Project (LMMBP) was initiated to directly support the development of a lakewide management plan (LaMP) for Lake Michigan. A mass balance modeling approach is proposed for the project to addrss the realtionship between sources of toxic chemicals and thei...

  16. 31 CFR 500.413 - Participation in certain development projects in Vietnam.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... However, had the ADB formally proposed the project in its monthly ADB Business Opportunities as a project... continued management and operation of the plants by the U.S. Company after completion, and for the insurance... is completed, Vietnam hires a U.S. marketing firm to develop marketing strategies for the product...

  17. Developing a common framework for integrated solid waste management advances in Managua, Nicaragua.

    PubMed

    Olley, Jane E; IJgosse, Jeroen; Rudin, Victoria; Alabaster, Graham

    2014-09-01

    This article describes the municipal solid waste management system in Managua, Nicaragua. It updates an initial profile developed by the authors for the 2010 UN-HABITAT publication Solid Waste Management in the World's Cities and applies the methodology developed in that publication. In recent years, the municipality of Managua has been the beneficiary of a range of international cooperation projects aimed at improving municipal solid waste management in the city. The article describes how these technical assistance and infrastructure investments have changed the municipal solid waste management panorama in the city and analyses the sustainability of these changes. The article concludes that by working closely with the municipal government, the UN-HABITAT project Strengthening Capacities for Solid Waste Management in Managua was able to unite these separate efforts and situate them within a strategic framework to guide the evolution of the municipal solid waste management system in the forthcoming years. The creation of this multi-stakeholder platform allowed for the implementation of joint activities and ensured coherence in the products generated by the different projects. This approach could be replicated in other cities and in other sectors with similar effect. Developing a long term vision was essential for the advancement of municipal solid waste management in the city. Nevertheless, plan implementation may still be undermined by the pressures of the short term municipal administrative government, which emphasize operational over strategic investment. © The Author(s) 2014.

  18. Recovery Act. Advanced Load Identification and Management for Buildings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang, Yi; Casey, Patrick; Du, Liang

    2014-02-12

    In response to the U.S. Department of Energy (DoE)’s goal of achieving market ready, net-zero energy residential and commercial buildings by 2020 and 2025, Eaton partnered with the Department of Energy’s National Renewable Energy Laboratory (NREL) and Georgia Institute of Technology to develop an intelligent load identification and management technology enabled by a novel “smart power strip” to provide critical intelligence and information to improve the capability and functionality of building load analysis and building power management systems. Buildings account for 41% of the energy consumption in the United States, significantly more than either transportation or industrial. Within the buildingmore » sector, plug loads account for a significant portion of energy consumption. Plug load consumes 15-20% of building energy on average. As building managers implement aggressive energy conservation measures, the proportion of plug load energy can increase to as much as 50% of building energy leaving plug loads as the largest remaining single source of energy consumption. This project focused on addressing plug-in load control and management to further improve building energy efficiency accomplished through effective load identification. The execution of the project falls into the following three major aspects; An intelligent load modeling, identification and prediction technology was developed to automatically determine the type, energy consumption, power quality, operation status and performance status of plug-in loads, using electric waveforms at a power outlet level. This project demonstrated the effectiveness of the developed technology through a large set of plug-in loads measurements and testing; A novel “Smart Power Strip (SPS) / Receptacle” prototype was developed to act as a vehicle to demonstrate the feasibility of load identification technology as a low-cost, embedded solution; and Market environment for plug-in load control and management solutions, in particular, advanced power strips (APSs) was studied. The project evaluated the market potential for Smart Power Strips (SPSs) with load identification and the likely impact of a load identification feature on APS adoption and effectiveness. The project also identified other success factors required for widespread APS adoption and market acceptance. Even though the developed technology is applicable for both residential and commercial buildings, this project is focused on effective plug-in load control and management for commercial buildings, accomplished through effective load identification. The project has completed Smart Receptacle (SR) prototype development with integration of Load ID, Control/Management, WiFi communication, and Web Service. Twenty SR units were built, tested, and demonstrated in the Eaton lab; eight SR units were tested in the National Renewable Energy Lab (NREL) for one-month of field testing. Load ID algorithm testing for extended load sets was conducted within the Eaton facility and at local university campuses. This report is to summarize the major achievements, activities, and outcomes under the execution of the project.« less

  19. Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope

    NASA Astrophysics Data System (ADS)

    Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.

    2012-09-01

    Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.

  20. The ZOG Technology Demonstration Project: A System Evaluation of USS CARL VINSON (CVN 70)

    DTIC Science & Technology

    1984-12-01

    part of a larger project involving development of a wide range of computer technologies, including artifcial intelligence and a long-range computer...shipboard manage- ment, aircraft management, expert systems, menu selection, man- machine interface, artificial intelligence , automation; shipboard It AWM...functions, planning, evaluation, training, hierarchical data bases The objective of this project was to conduct an evaluation of ZOG, a general purpose

  1. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    NASA Astrophysics Data System (ADS)

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-06-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning, spiral learning and peer assessment. Namely, the course is articulated during a semester through the structured (progressive and incremental) development of a sequence of four projects, whose duration, scope and difficulty of management increase as the student gains theoretical and instrumental knowledge related to planning, monitoring and controlling projects. Moreover, the proposal is complemented using peer assessment. The proposal has already been implemented and validated for the last 3 years in two different universities. In the first year, project-based learning and spiral learning methods were combined. Such a combination was also employed in the other 2 years; but additionally, students had the opportunity to assess projects developed by university partners and by students of the other university. A total of 154 students have participated in the study. We obtain a gain in the quality of the subsequently projects derived from the spiral project-based learning. Moreover, this gain is significantly bigger when peer assessment is introduced. In addition, high-performance students take advantage of peer assessment from the first moment, whereas the improvement in poor-performance students is delayed.

  2. Innovations in Advanced Materials and Metals Manufacturing Project (IAM2)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, Elizabeth

    This project, under the Jobs and Innovation Accelerator Challenge, Innovations in Advanced Materials and Metals Manufacturing Project, contracted with Cascade Energy to provide a shared energy project manager engineer to work with five different companies throughout the Portland metro grant region to implement ten energy efficiency projects and develop a case study to analyze the project model. As a part of the project, the energy project manager also looked into specific new technologies and methodologies that could change the way energy is consumed by manufacturers—from game-changing equipment and technology to monitor energy use to methodologies that change the way companiesmore » interact and use their machines to reduce energy consumption.« less

  3. Marginal reserves of energy and environmental problems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raveloson, E.A.; Rakotomaria, E.; Gazerian, J.P.

    1995-12-31

    Madagascar is a country which has a variety of energy fields that present limited reserves in quantity and quality. Up till now, these fields were not economically viable. When and how to change this situation? In the classical project management approach, there will not be any chance to drive up the development of these energy fields. Nowadays, the economical crisis is general at a world-wide level, but for each developing country it appears that poverty is closely linked to environmental problems. Drought, starvation, deforestation, intensive migration of population without taking into account the standard constraints of under-development, non existence ofmore » roads or of modern agriculture and industry, limitation of financing availability, etc. The preliminary conditions to answer efficiently the common problems of development and of environment should be the reduction of the project size to a reasonable investment, the splitting of the field to a small zones of {open_quotes}development and environment,{close_quotes} identifying the economic potential (agriculture, industry, tourism, trade, and consumer centers), then determining the model of energy production adapted to the in situ available raw material. Project management methods and competitive intelligence methods should be combined to find the right solution in due time for the southern part of Madagascar. From the logical framework method, the Logiframe software has been designed to be an efficient tool for developing countries project managers and decision makers to solve the projects integratability problems on behalf of a regional development program.« less

  4. Implementing chronic disease self-management in community settings: lessons from Australian demonstration projects.

    PubMed

    Francis, Caitlin F; Feyer, Anne-Marie; Smith, Ben J

    2007-11-01

    The evaluation of the Sharing Health Care Initiative addressed the translation of different models of chronic disease self-management into health and community service contexts in Australia. Across seven projects, four intervention models were adopted: (1) the Stanford Chronic Disease Self Management course; (2) generic disease management planning, training and support; (3) tailored disease management planning, training and support, and; (4) telephone coaching. Targeted recruitment through support groups and patient lists was most successful for reaching high-needs clients. Projects with well developed organisational structures and health system networks demonstrated more effective implementation. Engagement of GPs in recruitment and client support was limited. Future self-management programs will require flexible delivery methods in the primary health care setting, involving practice nurses or the equivalent. After 12 months there was little evidence of potential sustainability, although structures such as consumer resource centres and client support clubs were established in some locations. Only one project was able to use Medicare chronic disease-related items to integrate self-management support into routine general practice. Participants in all projects showed improvements in self-management practices, but those receiving Model 3, flexible and tailored support, and Model 4, telephone coaching, reported the greatest benefits.

  5. LANDFIRE: Collaboration for National Fire Fuel Assessment

    USGS Publications Warehouse

    Zhu, Zhi-Liang

    2006-01-01

    The implementation of national fire management policies, such as the National Fire Plan and the Healthy Forest Restoration Act, requires geospatial data of vegetation types and structure, wildland fuels, fire risks, and ecosystem fire regime conditions. Presently, no such data sets are available that can meet these requirements. As a result, the U.S. Department of Agriculture (USDA) Forest Service and the Department of the Interior's land management bureaus (Bureau of Indian Affairs (BIA), Bureau of Land Management (BLM), Fish and Wildlife Service (FWS), and National Park Service (NPS)) have jointly sponsored LANDFIRE, a new research and development project. The primary objective of the project is to develop an integrated and repeatable methodology and produce vegetation, fire, and ecosystem information and predictive models for cost-effective national land management applications. The project is conducted collaboratively by the U.S. Geological Survey (USGS), the USDA Forest Service, and The Nature Conservancy.

  6. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  7. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  8. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  9. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  10. 22 CFR 216.2 - Applicability of procedures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... river basin development; (ii) Irrigation or water management projects, including dams and impoundments... projects, programs or activities authorized or approved by A.I.D. and to substantive amendments or extensions of ongoing projects, programs, or activities. (b) Exemptions. (1) Projects, programs or activities...

  11. The Proposal Project

    ERIC Educational Resources Information Center

    Pierce, Elizabeth

    2007-01-01

    The proposal project stretches over a significant portion of the semester-long sophomore course Professional Communication (ENG 250) at Monroe Community College. While developing their proposal project, students need to use time management skills to successfully complete a quality project on time. In addition, excellent oral and written…

  12. Phased project planning and development in anticipation of operational programs

    NASA Technical Reports Server (NTRS)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  13. Interface Management for a NASA Flight Project Using Model-Based Systems Engineering (MBSE)

    NASA Technical Reports Server (NTRS)

    Vipavetz, Kevin; Shull, Thomas A.; Infeld, Samatha; Price, Jim

    2016-01-01

    The goal of interface management is to identify, define, control, and verify interfaces; ensure compatibility; provide an efficient system development; be on time and within budget; while meeting stakeholder requirements. This paper will present a successful seven-step approach to interface management used in several NASA flight projects. The seven-step approach using Model Based Systems Engineering will be illustrated by interface examples from the Materials International Space Station Experiment-X (MISSE-X) project. The MISSE-X was being developed as an International Space Station (ISS) external platform for space environmental studies, designed to advance the technology readiness of materials and devices critical for future space exploration. Emphasis will be given to best practices covering key areas such as interface definition, writing good interface requirements, utilizing interface working groups, developing and controlling interface documents, handling interface agreements, the use of shadow documents, the importance of interface requirement ownership, interface verification, and product transition.

  14. Commitment of project participants to developing health care services based on the internet technology.

    PubMed

    Kouri, Pirkko; Karjalainen-Jurvelin, Ritva; Kinnunen, Juha

    2005-12-01

    When developing Information and Communication Technology (ICT), such as services for the decision-making process, skilled health care professionals with their comprehensive knowledge of patients/clients are essential contributors to the project. Careful evaluation is needed to assess the effectiveness of project management as well as to analyze the commitment of the personnel to goal attainment. In the course of the development of integrated maternity care services, the commitment of project participants (n=48) was evaluated. What factors enhanced or impaired their commitment to the project work? Questionnaire (n=80, response rate 60%) with quantitative analysis as well as open-ended questions with qualitative content analysis. Positive commitment was related to a confidential and open atmosphere during the project. The utilization of personal skills and experience was appreciated. Differences in the working principles and cultures between the participating organizations complicated fluent collaboration. To encourage commitment, a lot of attention should be paid to internal communication as well as the effective realization of project tasks. The strength of the project was the highly innovative and confidential atmosphere. The well-established project goals, the highly inspired project team, and the effective co-operation between the project manager and the core group helped to deepen overall commitment in the project.

  15. 24 CFR 990.295 - Resident Management Corporation operating subsidy.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Resident Management Corporation... Managed by Resident Management Corporations (RMCs) § 990.295 Resident Management Corporation operating subsidy. (a) General. This part applies to all projects managed by a Resident Management Corporation (RMC...

  16. 24 CFR 990.295 - Resident Management Corporation operating subsidy.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Resident Management Corporation... Managed by Resident Management Corporations (RMCs) § 990.295 Resident Management Corporation operating subsidy. (a) General. This part applies to all projects managed by a Resident Management Corporation (RMC...

  17. 24 CFR 990.295 - Resident Management Corporation operating subsidy.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Resident Management Corporation... Managed by Resident Management Corporations (RMCs) § 990.295 Resident Management Corporation operating subsidy. (a) General. This part applies to all projects managed by a Resident Management Corporation (RMC...

  18. 24 CFR 990.295 - Resident Management Corporation operating subsidy.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Resident Management Corporation... Managed by Resident Management Corporations (RMCs) § 990.295 Resident Management Corporation operating subsidy. (a) General. This part applies to all projects managed by a Resident Management Corporation (RMC...

  19. 24 CFR 990.295 - Resident Management Corporation operating subsidy.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Resident Management Corporation... Managed by Resident Management Corporations (RMCs) § 990.295 Resident Management Corporation operating subsidy. (a) General. This part applies to all projects managed by a Resident Management Corporation (RMC...

  20. Climate Risk Management and Decision Support Tools for the Agriculture Sector in Lao PDR, Bangladesh, and Indonesia

    NASA Astrophysics Data System (ADS)

    Allis, E. C.; Greene, A. M.; Cousin, R.

    2014-12-01

    We describe a comprehensive project for developing climate information and decision support / climate risk management tools in Lao PDR, Bangladesh and Indonesia. Mechanisms are developed for bringing the benefits of these tools to both policy makers and poor rural farmers, with the goal of enabling better management, at the farm level, of the risks associated with climate variability and change. The project comprises several interwoven threads, differentially applied in the different study regions. These include data management and quality control, development of seasonal forecast capabilities, use of dynamic cropping calendars and climate advisories, the development of longer-term climate information for both past and future and a weather index insurance component. Stakeholder engagement and capacity building served as reinforcing and complementary elements to all components. In this talk we will provide a project overview, show how the various components fit together and describe some lessons learned in this attempt to promote the uptake of actionable climate information from farmer to policy level. The applied research project was led by the International Research Institute for Climate and Society (IRI) at Columbia University with funding from the International Fund for Agriculture Development (IFAD) and in close collaboration with our regional partners at the Centre for Climate Risk and Opportunity Management in Southeast Asia Pacific (at Bogor Agricultural University in Indonesia), Indonesia's National Agency for Meteorology, Climatology and Geophysics (BMKG), Lao PDR's National Agriculture and Forestry Research Institute (NAFRI), Laotian Department of Meteorology and Hydrology (DMH), WorldFish Center, Bangladesh Meteorology Department (BMD), and CGIAR Research Program on Climate Change, Agriculture and Food Security (CCAFS).

Top