Sample records for managing multiple projects

  1. Improvement of Project Portfolio Management in an Information Technology Consulting Company

    NASA Astrophysics Data System (ADS)

    Kaewta, S.; Chutima, P.

    2014-06-01

    The scope of this research is to improve the efficiency of multiple project management in an information technology consulting company through the adaptation of the project portfolio management technique. The project management information system (PMIS) is implemented to establish effective communication channels so that internal and external teams as well as all relevant stakeholders can be employed to negotiate their work schedules. In addition, all activities created by multiple teams can be systematically reviewed and combined into a single checklist to be used as an agreed working plan for all team members. A general guideline for project portfolio management in information technology consulting companies is also proposed, which could results in a higher level of project on-time delivery.

  2. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  3. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  4. 77 FR 11109 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ...-Native Plant Control Project, Proposes a Forest-Wide Integrated Management Strategy to Control the Spread..., Final EIS, USFS, SD, Steamboat Project, Proposes to Implement Multiple Resource Management Actions... EIS, USFS, WA, South George Vegetation and Fuels Management Project, To Improve Forest Health and...

  5. Charleston Harbor, SC, Regional Sediment Management Study; Beneficial Use of Dredged Material through Nearshore Placement

    DTIC Science & Technology

    2017-05-01

    Project 454632, “Charleston Harbor, SC, Regional Sediment Management Study” Project . The HQUSACE RSM Program Manager was Ms. Linda S. Lillycrop, U.S. Army...objective of the U.S. Army Corps of Engineers (USACE) RSM Program is to improve the management of sediments across multiple projects , manage sediments as a...optimize use of sediments and streamline projects . The adaptive management strategies are developed and implemented through application of the best

  6. Charleston Harbor, SC, Regional Sediment Management Study: Beneficial Use of Dredged Material through Nearshore Placement

    DTIC Science & Technology

    2017-05-01

    Project 454632, “Charleston Harbor, SC, Regional Sediment Management Study” Project . The HQUSACE RSM Program Manager was Ms. Linda S. Lillycrop, U.S. Army...objective of the U.S. Army Corps of Engineers (USACE) RSM Program is to improve the management of sediments across multiple projects , manage sediments as a...optimize use of sediments and streamline projects . The adaptive management strategies are developed and implemented through application of the best

  7. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  8. The Missouri Ozark Forest Ecosystem Project: past, present, and future

    Treesearch

    Brian L. Brookshire; Randy Jensen; Daniel C. Dey

    1997-01-01

    In 1989, the Missouri Department of Conservation initiated a research project to examine the impacts of forest management practices on multiple ecosystem components. The Missouri Ozark Forest Ecosystem Project (MOFEP) is a landscape experiment comparing the impacts of even-aged management, uneven-aged management, and no harvesting on a wide array of ecosystem...

  9. Katy Freeway : an evaluation of a second-generation managed lanes project.

    DOT National Transportation Integrated Search

    2013-04-01

    The Katy Freeway Managed Lanes (KML) represents the first operational, multilane managed facility in : Texas and provides an opportunity to benefit from the lessons learned from the project. This study evaluated : multiple aspects of KML and the crit...

  10. Task Management for Firefighters: A Practical Approach to Task Management.

    ERIC Educational Resources Information Center

    Roberts, Stephen S.

    1979-01-01

    A project management system for organizing requests from multiple departments and controlling the workload of the development/maintenance computer staff is described. Practical solutions to deciding project priorities, determining time estimates, creating positive peer pressure among programing staff, and formalizing information requests are…

  11. Floristic Quality Index of Restored Wetlands in Coastal Louisiana

    DTIC Science & Technology

    2017-08-01

    been used to monitor and assess project performance, resilience, and adaptive management needs. An emerging tool for performing bioassessments in...condition have been used to monitor and assess project performance, resilience, and adaptive management needs. There are three basic levels of wetland...result of saltwater intrusion and rapid subsidence; nevertheless, multiple hydrologic restoration projects (Naomi Outfall Management BA-03c and

  12. Management of Globally Distributed Software Development Projects in Multiple-Vendor Constellations

    NASA Astrophysics Data System (ADS)

    Schott, Katharina; Beck, Roman; Gregory, Robert Wayne

    Global information systems development outsourcing is an apparent trend that is expected to continue in the foreseeable future. Thereby, IS-related services are not only increasingly provided from different geographical sites simultaneously but beyond that from multiple service providers based in different countries. The purpose of this paper is to understand how the involvement of multiple service providers affects the management of the globally distributed information systems development projects. As research on this topic is scarce, we applied an exploratory in-depth single-case study design as research approach. The case we analyzed comprises a global software development outsourcing project initiated by a German bank together with several globally distributed vendors. For data collection and data analysis we have adopted techniques suggested by the grounded theory method. Whereas the extant literature points out the increased management overhead associated with multi-sourcing, the analysis of our case suggests that the required effort for managing global outsourcing projects with multiple vendors depends among other things on the maturation level of the cooperation within the vendor portfolio. Furthermore, our data indicate that this interplay maturity is positively impacted through knowledge about the client that has been derived based on already existing client-vendor relationships. The paper concludes by offering theoretical and practical implications.

  13. Exploring Stakeholder Definitions within the Aerospace Industry: A Qualitative Case Study

    NASA Astrophysics Data System (ADS)

    Hebert, Jonathan R.

    A best practice in the discipline of project management is to identify all key project stakeholders prior to the execution of a project. When stakeholders are properly identified, they can be consulted to provide expert advice on project activities so that the project manager can ensure the project stays within the budget and schedule constraints. The problem addressed by this study is that managers fail to properly identify key project stakeholders when using stakeholder theory because there are multiple conflicting definitions for the term stakeholder. Poor stakeholder identification has been linked to multiple negative project outcomes such as budget and schedules overruns, and this problem is heightened in certain industries such as aerospace. The purpose of this qualitative study was to explore project managers' and project stakeholders' perceptions of how they define and use the term stakeholder within the aerospace industry. This qualitative exploratory single-case study had two embedded units of analysis: project managers and project stakeholders. Six aerospace project managers and five aerospace project stakeholders were purposively selected for this study. Data were collected through individual semi-structured interviews with both project managers and project stakeholders. All data were analyzed using Yin's (2011) five-phased cycle approach for qualitative research. The results indicated that the aerospace project managers and project stakeholder define the term stakeholder as "those who do the work of a company." The participants build upon this well-known concept by adding that, "a company should list specific job titles" that correspond to their company specific-stakeholder definition. Results also indicated that the definition of the term stakeholder is used when management is assigning human resources to a project to mitigate or control project risk. Results showed that project managers tended to include the customer in their stakeholder definitions while project stakeholders included a wider range of stakeholders from young employees to union workers. Practical application recommendations, based on the study's findings, include that companies start to develop company-specific definitions of the term stakeholder. Recommendations for future research should focus on exploring how CEOs, executive members, new hires, and hourly workers define and use the term stakeholder in the aerospace industry.

  14. Conceptual framework of the Controlling Asthma in American Cities Project.

    PubMed

    Herman, Elizabeth Jane

    2011-02-01

    The Controlling Asthma in American Cities Project (CAACP) was designed to improve the control of asthma in inner-city populations of children with a disparate burden of symptoms and adverse outcomes. As with many chronic diseases, asthma is the manifestation of multiple biologic, environmental, and social determinants. In addition to appropriate medical management, individuals with asthma must have logistical, financial, and cultural access to environments that allow avoidance of asthma triggers and encourage good asthma management practices. In recognition of this complexity, the CAACP required the seven project sites to coordinate and synchronize multiple interventions (education, healthcare access, medical management, trigger reduction) at multiple levels (individual, home, school, community, and policy) through the collaboration of relevant groups, institutions, and individuals. This paper describes the "program theory" of the CAACP project-the assumptions about how the project worked, how the components were linked, and what outcomes were anticipated. It relates the subsequent papers in the supplement to the program theory and describes how the papers can inform and guide other community-based interventions, and advance the translation of scientific knowledge to effective interventions in communities of need.

  15. The effectiveness of risk management: an analysis of project risk planning across industries and countries.

    PubMed

    Zwikael, Ofer; Ahn, Mark

    2011-01-01

    This article examines the effectiveness of current risk management practices to reduce project risk using a multinational, multi-industry study across different scenarios and cultures. A survey was administered to 701 project managers, and their supervisors, in seven industries and three diverse countries (New Zealand, Israel, and Japan), in multiple languages during the 2002-2007 period. Results of this study show that project context--industry and country where a project is executed--significantly impacts perceived levels of project risk, and the intensity of risk management processes. Our findings also suggest that risk management moderates the relationship between risk level and project success. Specifically, we found that even moderate levels of risk management planning are sufficient to reduce the negative effect risk levels have on project success. © 2010 Society for Risk Analysis.

  16. [Potentials of cooperative quality management initiatives: BQS Institute projects, January 2010 - July 2013].

    PubMed

    Veit, Christof; Bungard, Sven; Hertle, Dagmar; Grothaus, Franz-Josef; Kötting, Joachim; Arnold, Nicolai

    2013-01-01

    Alongside the projects of internal quality management and mandatory quality assurance there is a variety of quality driven projects across institutions initiated and run by various partners to continuously improve the quality of care. The multiplicity and characteristics of these projects are discussed on the basis of projects run by the BQS Institute between 2010 and 2013. In addition, useful interactions and linking with mandatory quality benchmarking and with internal quality management are discussed. (As supplied by publisher). Copyright © 2013. Published by Elsevier GmbH.

  17. 76 FR 71353 - Notice of Availability of the Record of Decision for the DesertXpress Enterprises, LLC High-Speed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    ..., LLC High-Speed Passenger Train Project AGENCY: Bureau of Land Management, Interior. ACTION: Notice of... (ROD) for the DesertXpress Enterprises, LLC High-Speed Passenger Train Project (DesertXpress Project...-managed lands to build an Electrical Multiple Unit (EMU) high-speed passenger rail line in compliance with...

  18. Linking Multiple Databases: Term Project Using "Sentences" DBMS.

    ERIC Educational Resources Information Center

    King, Ronald S.; Rainwater, Stephen B.

    This paper describes a methodology for use in teaching an introductory Database Management System (DBMS) course. Students master basic database concepts through the use of a multiple component project implemented in both relational and associative data models. The associative data model is a new approach for designing multi-user, Web-enabled…

  19. Simulating fire and forest dynamics for a coordinated landscape fuel treatment project in the Sierra Nevada

    Treesearch

    Brandon M. Collins; Scott L. Stephens; Gary B. Roller; John Battles

    2011-01-01

    We evaluate an actual landscape fuel treatment project that was designed by local U. S. Forest Service managers in the northern Sierra Nevada. We model the effects of this project at reducing landscape-level fire behavior at multiple time steps, up to nearly 30 yr beyond treatment implementation. Additionally, we modeled planned treatments under multiple diameter-...

  20. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    PubMed

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  1. Agile Task Tracking Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duke, Roger T.; Crump, Thomas Vu

    The work was created to provide a tool for the purpose of improving the management of tasks associated with Agile projects. Agile projects are typically completed in an iterative manner with many short duration tasks being performed as part of iterations. These iterations are generally referred to as sprints. The objective of this work is to create a single tool that enables sprint teams to manage all of their tasks in multiple sprints and automatically produce all standard sprint performance charts with minimum effort. The format of the printed work is designed to mimic a standard Kanban board. The workmore » is developed as a single Excel file with worksheets capable of managing up to five concurrent sprints and up to one hundred tasks. It also includes a summary worksheet providing performance information from all active sprints. There are many commercial project management systems typically designed with features desired by larger organizations with many resources managing multiple programs and projects. The audience for this work is the small organizations and Agile project teams desiring an inexpensive, simple, user-friendly, task management tool. This work uses standard readily available software, Excel, requiring minimum data entry and automatically creating summary charts and performance data. It is formatted to print out and resemble standard flip charts and provide the visuals associated with this type of work.« less

  2. Multiple-source spatial data fusion and integration research in the region unified planning management information system

    NASA Astrophysics Data System (ADS)

    Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun

    2008-12-01

    In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.

  3. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    NASA Technical Reports Server (NTRS)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  4. A case study of resources management planning with multiple objectives and projects

    NASA Astrophysics Data System (ADS)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  5. Evaluating Threats in Multinational Marine Ecosystems: A Coast Salish First Nations and Tribal Perspective.

    PubMed

    Gaydos, Joseph K; Thixton, Sofie; Donatuto, Jamie

    2015-01-01

    Despite the merit of managing natural resources on the scale of ecosystems, evaluating threats and managing risk in ecosystems that span multiple countries or jurisdictions can be challenging. This requires each government involved to consider actions in concert with actions being taken in other countries by co-managing entities. Multiple proposed fossil fuel-related and port development projects in the Salish Sea, a 16,925 km2 inland sea shared by Washington State (USA), British Columbia (Canada), and Indigenous Coast Salish governments, have the potential to increase marine vessel traffic and negatively impact natural resources. There is no legal mandate or management mechanism requiring a comprehensive review of the potential cumulative impacts of these development activities throughout the Salish Sea and across the international border. This project identifies ongoing and proposed energy-related development projects that will increase marine vessel traffic in the Salish Sea and evaluates the threats each project poses to natural resources important to the Coast Salish. While recognizing that Coast Salish traditions identify all species as important and connected, we used expert elicitation to identify 50 species upon which we could evaluate impact. These species were chosen because Coast Salish depend upon them heavily for harvest revenue or as a staple food source, they were particularly culturally or spiritually significant, or they were historically part of Coast Salish lifeways. We identified six development projects, each of which had three potential impacts (pressures) associated with increased marine vessel traffic: oil spill, vessel noise and vessel strike. Projects varied in their potential for localized impacts (pressures) including shoreline development, harbor oil spill, pipeline spill, coal dust accumulation and nearshore LNG explosion. Based on available published data, impact for each pressure/species interaction was rated as likely, possible or unlikely. Impacts are likely to occur in 23 to 28% of the possible pressure/species scenarios and are possible in another 15 to 28% additional pressure/species interactions. While it is not clear which impacts will be additive, synergistic, or potentially antagonistic, studies that manipulate multiple stressors in marine ecosystems suggest that threats associated with these six projects are likely to have an overall additive or even synergistic interaction and therefore impact species of major cultural importance to the Coast Salish, an important concept that would be lost by merely evaluating each project independently. Failure to address multiple impacts will affect the Coast Salish and the 7 million other people that also depend on this ecosystem. These findings show the value of evaluating multiple threats, and ultimately conducting risk assessments at the scale of ecosystems and highlight the serious need for managers of multinational ecosystems to actively collaborate on evaluating threats, assessing risk, and managing resources.

  6. Evaluating Threats in Multinational Marine Ecosystems: A Coast Salish First Nations and Tribal Perspective

    PubMed Central

    Gaydos, Joseph K.; Thixton, Sofie; Donatuto, Jamie

    2015-01-01

    Despite the merit of managing natural resources on the scale of ecosystems, evaluating threats and managing risk in ecosystems that span multiple countries or jurisdictions can be challenging. This requires each government involved to consider actions in concert with actions being taken in other countries by co-managing entities. Multiple proposed fossil fuel-related and port development projects in the Salish Sea, a 16,925 km2 inland sea shared by Washington State (USA), British Columbia (Canada), and Indigenous Coast Salish governments, have the potential to increase marine vessel traffic and negatively impact natural resources. There is no legal mandate or management mechanism requiring a comprehensive review of the potential cumulative impacts of these development activities throughout the Salish Sea and across the international border. This project identifies ongoing and proposed energy-related development projects that will increase marine vessel traffic in the Salish Sea and evaluates the threats each project poses to natural resources important to the Coast Salish. While recognizing that Coast Salish traditions identify all species as important and connected, we used expert elicitation to identify 50 species upon which we could evaluate impact. These species were chosen because Coast Salish depend upon them heavily for harvest revenue or as a staple food source, they were particularly culturally or spiritually significant, or they were historically part of Coast Salish lifeways. We identified six development projects, each of which had three potential impacts (pressures) associated with increased marine vessel traffic: oil spill, vessel noise and vessel strike. Projects varied in their potential for localized impacts (pressures) including shoreline development, harbor oil spill, pipeline spill, coal dust accumulation and nearshore LNG explosion. Based on available published data, impact for each pressure/species interaction was rated as likely, possible or unlikely. Impacts are likely to occur in 23 to 28% of the possible pressure/species scenarios and are possible in another 15 to 28% additional pressure/species interactions. While it is not clear which impacts will be additive, synergistic, or potentially antagonistic, studies that manipulate multiple stressors in marine ecosystems suggest that threats associated with these six projects are likely to have an overall additive or even synergistic interaction and therefore impact species of major cultural importance to the Coast Salish, an important concept that would be lost by merely evaluating each project independently. Failure to address multiple impacts will affect the Coast Salish and the 7 million other people that also depend on this ecosystem. These findings show the value of evaluating multiple threats, and ultimately conducting risk assessments at the scale of ecosystems and highlight the serious need for managers of multinational ecosystems to actively collaborate on evaluating threats, assessing risk, and managing resources. PMID:26691860

  7. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  8. Flexible resource management and its effect on project cost and duration

    NASA Astrophysics Data System (ADS)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  9. Agile Preparation within a Traditional Project Management Course

    ERIC Educational Resources Information Center

    Landry, Jeffrey P.; McDaniel, Rachel

    2016-01-01

    Agile software approaches have seen a steady rise over a decade and a half, but agile's place in the information systems (IS) undergraduate curriculum is far from settled. While agile concepts may arguably be taught in multiple places in the IS curriculum, this paper argues for its inclusion in a project management course. This paper builds on…

  10. Collaboration across eight research centers: unanticipated benefits and outcomes for project managers.

    PubMed

    Perez, Norma A; Weathers, Benita; Willis, Marilyn; Mendez, Jacqueline

    2013-02-01

    Managers of transdisciplinary collaborative research lack suitable didactic material to support the implementation of research methodologies and to build ongoing partnerships with community representatives and peers, both between and within multiple academic centers. This article will provide insight on the collaborative efforts of project managers involved in multidisciplinary research and their subsequent development of a tool kit for research project managers and/or directors. Project managers from the 8 Centers for Population Health and Health Disparities across the nation participated in monthly teleconferences to share experiences and offer advice on how to achieve high participation rates and maintain community involvement in collaboration with researchers and community leaders to achieve the common goal of decreasing health inequities. In the process, managers recognized and seized the opportunity to produce a tool kit that was designed for future project managers and directors. Project managers in geographically distinct locations maintained a commitment to work together over 4 years and subsequently built upon an existing communications network to design a tool kit that could be disseminated easily to a diverse audience.

  11. MASTR-MS: a web-based collaborative laboratory information management system (LIMS) for metabolomics.

    PubMed

    Hunter, Adam; Dayalan, Saravanan; De Souza, David; Power, Brad; Lorrimar, Rodney; Szabo, Tamas; Nguyen, Thu; O'Callaghan, Sean; Hack, Jeremy; Pyke, James; Nahid, Amsha; Barrero, Roberto; Roessner, Ute; Likic, Vladimir; Tull, Dedreia; Bacic, Antony; McConville, Malcolm; Bellgard, Matthew

    2017-01-01

    An increasing number of research laboratories and core analytical facilities around the world are developing high throughput metabolomic analytical and data processing pipelines that are capable of handling hundreds to thousands of individual samples per year, often over multiple projects, collaborations and sample types. At present, there are no Laboratory Information Management Systems (LIMS) that are specifically tailored for metabolomics laboratories that are capable of tracking samples and associated metadata from the beginning to the end of an experiment, including data processing and archiving, and which are also suitable for use in large institutional core facilities or multi-laboratory consortia as well as single laboratory environments. Here we present MASTR-MS, a downloadable and installable LIMS solution that can be deployed either within a single laboratory or used to link workflows across a multisite network. It comprises a Node Management System that can be used to link and manage projects across one or multiple collaborating laboratories; a User Management System which defines different user groups and privileges of users; a Quote Management System where client quotes are managed; a Project Management System in which metadata is stored and all aspects of project management, including experimental setup, sample tracking and instrument analysis, are defined, and a Data Management System that allows the automatic capture and storage of raw and processed data from the analytical instruments to the LIMS. MASTR-MS is a comprehensive LIMS solution specifically designed for metabolomics. It captures the entire lifecycle of a sample starting from project and experiment design to sample analysis, data capture and storage. It acts as an electronic notebook, facilitating project management within a single laboratory or a multi-node collaborative environment. This software is being developed in close consultation with members of the metabolomics research community. It is freely available under the GNU GPL v3 licence and can be accessed from, https://muccg.github.io/mastr-ms/.

  12. Open Innovation and the Erosion of the Traditional Information Systems Project's Boundaries

    NASA Astrophysics Data System (ADS)

    Elbanna, Amany

    This paper examines the notion of open innovation and its implication on information systems management. It investigates a project of an enterprise resource planning system implementation in an international organization to unravel the resemblance with the open innovation model. The study shows that the conceptualization of ERP project as an open innovation could reveal the complex architecture of today's organization from which the ERP project cannot be isolated. It argues that the traditional boundaries around IS projects are dissolving and the relationship between what used to be outside and what used to be inside the project is increasingly blurred. The study calls for a different perspective of project management that goes beyond single and multiple project management to scan the open space of innovation and actively look for partners, competitors, and collaborators.

  13. First-line nurse leaders' health-care change management initiatives.

    PubMed

    Macphee, Maura; Suryaprakash, Nitya

    2012-03-01

    To examine nurse leaders' change management projects within British Columbia, Canada. British Columbia Nursing Leadership Institute 2007-10 attendees worked on year-long change management initiatives/projects of importance to their respective health-care institutions. Most leaders were in first-line positions with <3 years' experience. Consenting leaders' project reports (N = 133) were content analysed for specific themes: types of projects; scope of projects (e.g. unit or local level, departmental, institutional); influence targets or key stakeholder groups targeted by the projects; leadership successes and challenges. Of study participants, 77% successfully completed their projects. Staff tool and resource development and existing services improvement were major project types. Care delivery teams were the major influence targets. Only 25% of projects were at the unit level. Many projects had broader scopes, such as institutional levels. Participants cited multiple leadership successes, including enhanced leadership styles and organizational skills. First-line nurse leaders were able to successfully manage projects beyond their traditional scope of responsibilities. The majority of projects dealt with staff needs and healthcare restructuring initiatives. Constant change is a global reality. Change management, a universal competency, must be included in leadership development programmes. © 2011 Blackwell Publishing Ltd.

  14. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil and gas drilling projects could help oil companies improve the performance of future drilling projects. Theoretically, the study's findings may help to bridge a gap in the project management CSFs literature, and add to the general project management body of knowledge.

  15. An Alignment Model for Collaborative Value Networks

    NASA Astrophysics Data System (ADS)

    Bremer, Carlos; Azevedo, Rodrigo Cambiaghi; Klen, Alexandra Pereira

    This paper presents parts of the work carried out in several global organizations through the development of strategic projects with high tactical and operational complexity. By investing in long-term relationships, strongly operating in the transformation of the competitive model and focusing on the value chain management, the main aim of these projects was the alignment of multiple value chains. The projects were led by the Axia Transformation Methodology as well as by its Management Model and following the principles of Project Management. As a concrete result of the efforts made in the last years in the Brazilian market this work also introduces the Alignment Model which supports the transformation process that the companies undergo.

  16. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project

    DOT National Transportation Integrated Search

    2018-01-11

    Background: Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available e...

  17. Radio frequency identification (RFID) tagging for material tracking and future asset management : research project capsule.

    DOT National Transportation Integrated Search

    2016-07-01

    Current Louisiana Department of Transportation and Development (DOTD) : practice allows multiple mixtures or materials to be submitted and subsequently : used during a highway construction project. Such materials include mechanically : stabilized ear...

  18. Burning questions for managers: Fuels management practices in riparian areas

    Treesearch

    Kristen E. Meyer; Kathleen A. Dwire; Patricia A. Champ; Sandra E. Ryan; Gregg M. Riegel; Timothy A. Burton

    2012-01-01

    Vegetation treatment projects for fuel reduction in riparian areas can pose distinct challenges to resource managers. Riparian areas are protected by administrative regulations, many of which are largely custodial and restrict active management. Like uplands, however, riparian areas have been affected by fire suppression, land use, and multiple types of disturbance....

  19. Project Management Using Modern Guidance, Navigation and Control Theory

    NASA Technical Reports Server (NTRS)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state of the system. The behavior of a system, as captured in the system modeling, when properly done will aid in accurately predicting future system performance. The Feedback Control system understands the state and behavior of the system and uses feedback to adjust control inputs into the system. The feedback, which is the right arm of the Control system, allows change to be affected in the overall system; it therefore is important to not only correctly identify the system feedback inputs, but also the system response to the feedback inputs. The Navigation system takes multiple data inputs and based on a priori knowledge of the inputs, develops a statistically based weighting of the inputs and measurements to determine the system's state. Guidance and Planning Logic of the system, complete with an understanding of where the system is (provided by the Navigation system), will in turn determine where the system needs to be and how to get it there. With any system/project, it is critical that the objective of the system/project be clearly defined -- not only to plan but to measure performance and to aid in guiding the system or the project. The system principles discussed above, which can be and have been applied to the current CxP space suit development project, can also be mapped to real-world constituents, thus allowing project managers to apply systems theories that are well defined in engineering and mathematics to a discipline (i.e., Project Management) that historically has been based in personal experience and intuition. This mapping of GN&C theory to Project Management will, in turn, permit a direct, methodical approach to Project Management, planning and control providing a tool to help predict (and guide) performance and an understanding of the project constraints, how the project can be controlled, and the impacts to external influences and inputs. This approach, to a project manager, flows down to the three bottom-line variables of cost, schedule, and scope ando the needed control of these three variables to successfully perform and complete a project.

  20. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  1. Managing aquatic ecosystems and water resources under multiple stress--an introduction to the MARS project.

    PubMed

    Hering, Daniel; Carvalho, Laurence; Argillier, Christine; Beklioglu, Meryem; Borja, Angel; Cardoso, Ana Cristina; Duel, Harm; Ferreira, Teresa; Globevnik, Lidija; Hanganu, Jenica; Hellsten, Seppo; Jeppesen, Erik; Kodeš, Vit; Solheim, Anne Lyche; Nõges, Tiina; Ormerod, Steve; Panagopoulos, Yiannis; Schmutz, Stefan; Venohr, Markus; Birk, Sebastian

    2015-01-15

    Water resources globally are affected by a complex mixture of stressors resulting from a range of drivers, including urban and agricultural land use, hydropower generation and climate change. Understanding how stressors interfere and impact upon ecological status and ecosystem services is essential for developing effective River Basin Management Plans and shaping future environmental policy. This paper details the nature of these problems for Europe's water resources and the need to find solutions at a range of spatial scales. In terms of the latter, we describe the aims and approaches of the EU-funded project MARS (Managing Aquatic ecosystems and water Resources under multiple Stress) and the conceptual and analytical framework that it is adopting to provide this knowledge, understanding and tools needed to address multiple stressors. MARS is operating at three scales: At the water body scale, the mechanistic understanding of stressor interactions and their impact upon water resources, ecological status and ecosystem services will be examined through multi-factorial experiments and the analysis of long time-series. At the river basin scale, modelling and empirical approaches will be adopted to characterise relationships between multiple stressors and ecological responses, functions, services and water resources. The effects of future land use and mitigation scenarios in 16 European river basins will be assessed. At the European scale, large-scale spatial analysis will be carried out to identify the relationships amongst stress intensity, ecological status and service provision, with a special focus on large transboundary rivers, lakes and fish. The project will support managers and policy makers in the practical implementation of the Water Framework Directive (WFD), of related legislation and of the Blueprint to Safeguard Europe's Water Resources by advising the 3rd River Basin Management Planning cycle, the revision of the WFD and by developing new tools for diagnosing and predicting multiple stressors. Copyright © 2014. Published by Elsevier B.V.

  2. Briefing paper : toward a best practice model for managed lanes in Texas.

    DOT National Transportation Integrated Search

    2013-09-01

    Over the past two decades, agencies : have increasingly implemented managed : lanes (MLs) to mitigate growing urban traffic : congestion in the United States. Multiple operating : projects : representing a combination : of HOV-to-HOT conversions a...

  3. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  4. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    PubMed Central

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  5. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    PubMed

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  6. Doing Research That Matters: A Success Story from Statistics Education

    ERIC Educational Resources Information Center

    Hipkins, Rosemary

    2014-01-01

    This is the first report from a new initiative called TLRI Project Plus. It aims to add value to the Teaching and Learning Research Initiative (TLRI), which NZCER manages on behalf of the government, by synthesising findings across multiple projects. This report focuses on two projects in statistics education and explores the factors that…

  7. From shared care to disease management: key-influencing factors.

    PubMed

    Eijkelberg, I M; Spreeuwenberg, C; Mur-Veeman, I M; Wolffenbuttel, B H

    2001-01-01

    In order to improve the quality of care of chronically ill patients the traditional boundaries between primary and secondary care are questioned. To demolish these boundaries so-called 'shared care' projects have been initiated in which different ways of substitution of care are applied. When these projects end, disease management may offer a solution to expand the achieved co-operation between primary and secondary care. Answering the question: What key factors influence the development and implementation of shared care projects from a management perspective and how are they linked? The theoretical framework is based on the concept of the learning organisation. Reference point is a multiple case study that finally becomes a single case study. Data are collected by means of triangulation. The studied cases concern two interrelated Dutch shared care projects for type 2 diabetic patients, that in the end proceed as one disease management project. In these cases the predominant key-influencing factors appear to be the project management, commitment and local context, respectively. The factor project management directly links the latter two, albeit managing both appear prerequisites to its success. In practice this implies managing the factors' interdependency by the application of change strategies and tactics in a committed and skillful way. Project management, as the most important and active key factor, is advised to cope with the interrelationships of the influencing factors in a gradually more fundamental way by using strategies and tactics that enable learning processes. Then small-scale shared care projects may change into a disease management network at a large scale, which may yield the future blueprint to proceed.

  8. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  9. Data management for support of the Oregon Transect Ecosystem Research (OTTER) project

    NASA Technical Reports Server (NTRS)

    Skiles, J. W.; Angelici, Gary L.

    1993-01-01

    Management of data collected during projects that involve large numbers of scientists is an often overlooked aspect of the experimental plan. Ecosystem science projects like the Oregon Transect Ecosystem Research (OTTER) Project that involve many investigators from many institutions and that run for multiple years, collect and archive large amounts of data. These data range in size from a few kilobytes of information for such measurements as canopy chemistry and meteorological variables, to hundreds of megabytes of information for such items as views from multi-band spectrometers flown on aircraft and scenes from imaging radiometers aboard satellites. Organizing and storing data from the OTTER Project, certifying those data, correcting errors in data sets, validating the data, and distributing those data to other OTTER investigators is a major undertaking. Using the National Aeronautics and Space Administration's (NASA) Pilot Land Data System (PLDS), a Support mechanism was established for the OTTER Project which accomplished all of the above. At the onset of the interaction between PLDS and OTTER, it was not certain that PLDS could accomplish these tasks in a manner that would aid researchers in the OTTER Project. This paper documents the data types that were collected under the auspices of the OTTER Project and the procedures implemented to store, catalog, validate, and certify those data. The issues of the compliance of investigators with data-management requirements, data use and certification, and the ease of retrieving data are discussed. We advance the hypothesis that formal data management is necessary in ecological investigations involving multiple investigators using many data gathering instruments and experimental procedures. The issues and experience gained in this exercise give an indication of the needs for data management systems that must be addressed in the coming decades when other large data-gathering endeavors are undertaken by the ecological science community.

  10. Portfolio Analysis Tool

    NASA Technical Reports Server (NTRS)

    Barth, Tim; Zapata, Edgar; Benjamin, Perakath; Graul, Mike; Jones, Doug

    2005-01-01

    Portfolio Analysis Tool (PAT) is a Web-based, client/server computer program that helps managers of multiple projects funded by different customers to make decisions regarding investments in those projects. PAT facilitates analysis on a macroscopic level, without distraction by parochial concerns or tactical details of individual projects, so that managers decisions can reflect the broad strategy of their organization. PAT is accessible via almost any Web-browser software. Experts in specific projects can contribute to a broad database that managers can use in analyzing the costs and benefits of all projects, but do not have access for modifying criteria for analyzing projects: access for modifying criteria is limited to managers according to levels of administrative privilege. PAT affords flexibility for modifying criteria for particular "focus areas" so as to enable standardization of criteria among similar projects, thereby making it possible to improve assessments without need to rewrite computer code or to rehire experts, and thereby further reducing the cost of maintaining and upgrading computer code. Information in the PAT database and results of PAT analyses can be incorporated into a variety of ready-made or customizable tabular or graphical displays.

  11. Citizen Science: Data Sharing For, By, and With the Public

    NASA Astrophysics Data System (ADS)

    Wiggins, A.

    2017-12-01

    Data sharing in citizen science is just as challenging as it is for any other type of science, except that there are more parties involved, with more diverse needs and interests. This talk provides an overview of the challenges and current efforts to advance data sharing in citizen science, and suggests refocusing data management activities on supporting the needs of multiple audiences. Early work on data sharing in citizen science advocated applying the standards and practices of academia, which can only address the needs of one of several audiences for citizen science data, and academics are not always the primary audience. Practitioners still need guidance on how to better share data other key parties, such as participants and policymakers, and which data management practices to prioritize for addressing the needs of multiple audiences. The benefits to the project of investing scarce resources into data products and dissemination strategies for each target audience still remain variable, unclear, or unpredictable. And as projects mature and change, the importance of data sharing activities and audiences are likely to change as well. This combination of multiple diverse audiences, shifting priorities, limited resources, and unclear benefits creates a perfect storm of conditions to suppress data sharing. Nonetheless, many citizen science projects make the effort, with exemplars showing substantial returns on data stewardship investments, and international initiatives are underway to bolster the data sharing capacity of the field. To improve the state of data sharing in citizen science, strategic use of limited resources suggests prioritizing data management activities that support the needs of multiple audiences. These may include better transparency about data access and usage, and standardized reporting of broader impacts from secondary data users, to both reward projects and incentivize further data sharing.

  12. Structure and Management of European R&D Projects: A View from Industrial Liaison Organizations

    ERIC Educational Resources Information Center

    Arranz, N.; de Arroyabe, J. C. Fdez.

    2009-01-01

    Collaboration between economic agents, especially in technological areas, is characterized by ambiguity in terminology, multiple analytical approaches, a diversity of objectives and multiple organizational forms, among which the network constitutes the most important example of "common organization" in international collaboration. This…

  13. DYNAMIC PROJECT COLLABORATION TOOLS FOR UNEXPLODED ORDNANCE (UXO) REMOVAL Case Study: Jefferson Proving Ground UXO Removal Projector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daffron, James Y.

    2003-02-27

    Unexploded Ordnance (UXO) removal and investigation projects typically involve multiple organizations including Government entities, private contractors, and technical experts. Resources are split into functional ''teams'' who perform the work and interface with the clients. The projects typically generate large amounts of data that must be shared among the project team members, the clients, and the public. The ability to efficiently communicate and control information is essential to project success. Web-based project collaboration is an effective management and communication tool when applied to ordnance and explosives (OE) projects. During a recent UXO/OE removal project at the Jefferson Proving Ground (JPG) inmore » Madison, IN, American Technologies, Inc. (ATI) successfully used the Project Commander(reg sign) (www.ProCommander.com) project collaboration website as a dynamic project and information management tool.« less

  14. The Legacy Ecosystem Management Framework: From Theory to Application in the Detention Pond Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coty, J; Stevenson, M; Vogt, K A

    The Detention Pond is a constructed and lined storm water treatment basin at Lawrence Livermore National Laboratory that serves multiple stakeholder objectives and programmatic goals. This paper examines the process and outcome involved in the development of a new management plan for the Detention Pond. The plan was created using a new ecosystem management tool, the Legacy Framework. This stakeholder-driven conceptual framework provides an interdisciplinary methodology for determining ecosystem health, appropriate management strategies, and sensitive indicators. The conceptual framework, the Detention Ponds project, and the use of the framework in the context of the project, are described and evaluated, andmore » evaluative criteria for this and other ecosystem management frameworks are offered. The project benefited in several ways from use of the Legacy Framework, although refinements to the framework are suggested. The stakeholder process created a context and environment in which team members became receptive to using an ecosystem management approach to evaluate and support management alternatives previously not considered. This allowed for the unanimous agreement to pursue support from upper management and organizational funding to implement a progressive management strategy. The greatly improved stakeholder relations resulted in upper management support for the project.« less

  15. A Fire Severity Mapping System (FSMS) for real-time management applications and long term planning: Developing a map of the landscape potential for severe fire in the western United States

    Treesearch

    Gregory K. Dillon; Zachary A. Holden; Penny Morgan; Bob Keane

    2009-01-01

    The Fire Severity Mapping System project is geared toward providing fire managers across the western United States with critical information for dealing with and planning for the ecological effects of wildfire at multiple levels of thematic, spatial, and temporal detail. For this project, we are developing a comprehensive, west-wide map of the landscape potential for...

  16. From shared care to disease management: key-influencing factors

    PubMed Central

    Eijkelberg, Irmgard M.J.G.; Spreeuwenberg, Cor; Mur-Veeman, Ingrid M.; Wolffenbuttel, Bruce H.R.

    2001-01-01

    Abstract Background In order to improve the quality of care of chronically ill patients the traditional boundaries between primary and secondary care are questioned. To demolish these boundaries so-called ‘shared care’ projects have been initiated in which different ways of substitution of care are applied. When these projects end, disease management may offer a solution to expand the achieved co-operation between primary and secondary care. Objective Answering the question: What key factors influence the development and implementation of shared care projects from a management perspective and how are they linked? Theory The theoretical framework is based on the concept of the learning organisation. Design Reference point is a multiple case study that finally becomes a single case study. Data are collected by means of triangulation. The studied cases concern two interrelated Dutch shared care projects for type 2 diabetic patients, that in the end proceed as one disease management project. Results In these cases the predominant key-influencing factors appear to be the project management, commitment and local context, respectively. The factor project management directly links the latter two, albeit managing both appear prerequisites to its success. In practice this implies managing the factors' interdependency by the application of change strategies and tactics in a committed and skilful way. Conclusion Project management, as the most important and active key factor, is advised to cope with the interrelationships of the influencing factors in a gradually more fundamental way by using strategies and tactics that enable learning processes. Then small-scale shared care projects may change into a disease management network at a large scale, which may yield the future blueprint to proceed. PMID:16896415

  17. Capturing the multiple benefits associated with nature-based solutions: lessons from natural flood management project in the Cotswolds, UK

    NASA Astrophysics Data System (ADS)

    Short, Chrisopher; Clarke, Lucy; Uttley, Chris; Smith, Brian

    2017-04-01

    Following severe flooding in 2007, and subsequent smaller flood events, a decision was taken in 2012 to explore nature-based solutions in 250km2 river catchment in the southern Cotswolds in the UK. A major tributary within the catchment has been designated as rapid response; with a primarily limestone geology limestone and a mixture of spring and surface drained sources along a number of tributaries feeding in the river, with one main population centre where the water bodies converge. The project involves landscape and land management interventions aimed at attenuating high flows to reduce flood risk through changes in land management practices in both agriculture and forestry and slowing peak flows in surface flows through increased infiltration and attenuation areas. After three years of the project it is clear that the threshold for effectiveness requires the majority of the upstream catchment area to be implementing these measures. However, the cost effectiveness of the approach seems to be substantial compared to traditional hard-engineering approaches. The level of community involvement, including local flood forums, is high and the social, and natural, capital has been enhanced through the project. Early results suggest that there have been localized improvements in water quality and biodiversity as well as a reduction in peak flow but such changes are difficult to directly associate to the project. What is clear is the role of communities, landowners and partners to implement natural flood management on a catchment wide scale. In this sense the project has adopted a co-management or adaptive management approach which brings together the knowledges of hydrologists, ecologists, farmers, woodland owners and the local community to implement locally be-spoke solutions within a broader project framework. This paper will outline the initial findings and the governance structure that has assisted in the early success of the project within a theoretical framework of co-management and suggest how this type of framework is suitable for a range of nature-based solutions across Europe. However, the challenge remains of capturing the multiple-benefits that such projects offer as these are often missed through conventional approaches such as cost-benefit analysis and some reflections on this will also be presented along with a potential way forward.

  18. How big is too big or how many partners are needed to build a large project which still can be managed successfully?

    NASA Astrophysics Data System (ADS)

    Henkel, Daniela; Eisenhauer, Anton

    2017-04-01

    During the last decades, the number of large research projects has increased and therewith the requirement for multidisciplinary, multisectoral collaboration. Such complex and large-scale projects pose new competencies to form, manage, and use large, diverse teams as a competitive advantage. For complex projects the effort is magnified because multiple large international research consortia involving academic and non-academic partners, including big industries, NGOs, private and public bodies, all with cultural differences, individually discrepant expectations on teamwork and differences in the collaboration between national and multi-national administrations and research organisations, challenge the organisation and management of such multi-partner research consortia. How many partners are needed to establish and conduct collaboration with a multidisciplinary and multisectoral approach? How much personnel effort and what kinds of management techniques are required for such projects. This presentation identifies advantages and challenges of large research projects based on the experiences made in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program. Possible strategies are discussed to circumvent and avoid conflicts already at the beginning of the project.

  19. Integrated design and management of complex and fast track projects

    NASA Astrophysics Data System (ADS)

    Mancini, Dario

    2003-02-01

    Modern scientific and technological projects are increasingly in competition over scientific aims, technological innovation, performance, time and cost. They require a dedicated and innovative organization able to satisfy contemporarily various technical and logistic constraints imposed by the final user, and guarantee the satisfaction of technical specifications, identified on the basis of scientific aims. In order to satisfy all the above, the management has to be strategically innovative and intuitive, by removing, first of all, the bottlenecks that are pointed out, usually only at the end of the projects, as the causes of general dissatisfaction. More than 30 years spent working on complex multidisciplinary systems and 20 years of formative experience in managing contemporarily both scientific, technological and industrial projects have given the author the possibility to study, test and validate strategies for parallel project management and integrated design, merged in a sort of unique optimized task, using the newly-coined word "Technomethodology". The paper highlights useful information to be taken into consideration during project organization to minimize the program deviations from the expected goals and describe some of the basic meanings of this new advanced method that is the key for parallel successful management of multiple and interdisciplinary activities.

  20. Why projects often fail even with high cost contingencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kujawski, Edouard

    2002-02-28

    In this note we assume that the individual risks have been adequately quantified and the total project cost contingency adequately computed to ensure an agreed-to probability or confidence level that the total project cost estimate will not be exceeded. But even projects that implement such a process are likely to result in significant cost overruns and/or project failure if the project manager allocates the contingencies to the individual subsystems. The intuitive and mathematically valid solution is to maintain a project-wide contingency and to distribute it to the individual risks on an as-needed basis. Such an approach ensures cost-efficient risk management,more » and projects that implement it are more likely to succeed and to cost less. We illustrate these ideas using a simplified project with two independent risks. The formulation can readily be extended to multiple risks.« less

  1. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  2. E-Learning, Multiple Intelligences Theory (MI) and Learner-Centred Instruction: Adapting MI Learning Theoretical Principles to the Instruction of Health and Safety to Construction Managers

    ERIC Educational Resources Information Center

    McNamee, Paul; Madden, Dave; McNamee, Frank; Wall, John; Hurst, Alan; Vrasidas, Charalambos; Chanquoy, Lucile; Baccino, Thierry; Acar, Emrah; Onwy-Yazici, Ela; Jordan, Ann

    2009-01-01

    This paper describes an ongoing EU project concerned with developing an instructional design framework for virtual classes (VC) that is based on the theory of Multiple Intelligences (MI) (1983). The psychological theory of Multiple Intelligences (Gardner 1983) has received much credence within instructional design since its inception and has been…

  3. LHCb migration from Subversion to Git

    NASA Astrophysics Data System (ADS)

    Clemencic, M.; Couturier, B.; Closier, J.; Cattaneo, M.

    2017-10-01

    Due to user demand and to support new development workflows based on code review and multiple development streams, LHCb decided to port the source code management from Subversion to Git, using the CERN GitLab hosting service. Although tools exist for this kind of migration, LHCb specificities and development models required careful planning of the migration, development of migration tools, changes to the development model, and redefinition of the release procedures. Moreover we had to support a hybrid situation with some software projects hosted in Git and others still in Subversion, or even branches of one projects hosted in different systems. We present the way we addressed the special LHCb requirements, the technical details of migrating large non standard Subversion repositories, and how we managed to smoothly migrate the software projects following the schedule of each project manager.

  4. Evaluation of Ensemble Water Supply and Demands Forecasts for Water Management in the Klamath River Basin

    NASA Astrophysics Data System (ADS)

    Broman, D.; Gangopadhyay, S.; McGuire, M.; Wood, A.; Leady, Z.; Tansey, M. K.; Nelson, K.; Dahm, K.

    2017-12-01

    The Upper Klamath River Basin in south central Oregon and north central California is home to the Klamath Irrigation Project, which is operated by the Bureau of Reclamation and provides water to around 200,000 acres of agricultural lands. The project is managed in consideration of not only water deliveries to irrigators, but also wildlife refuge water demands, biological opinion requirements for Endangered Species Act (ESA) listed fish, and Tribal Trust responsibilities. Climate change has the potential to impact water management in terms of volume and timing of water and the ability to meet multiple objectives. Current operations use a spreadsheet-based decision support tool, with water supply forecasts from the National Resources Conservation Service (NRCS) and California-Nevada River Forecast Center (CNRFC). This tool is currently limited in its ability to incorporate in ensemble forecasts, which offer the potential for improved operations by quantifying forecast uncertainty. To address these limitations, this study has worked to develop a RiverWare based water resource systems model, flexible enough to use across multiple decision time-scales, from short-term operations out to long-range planning. Systems model development has been accompanied by operational system development to handle data management and multiple modeling components. Using a set of ensemble hindcasts, this study seeks to answer several questions: A) Do a new set of ensemble streamflow forecasts have additional skill beyond what?, and allow for improved decision making under changing conditions? B) Do net irrigation water requirement forecasts developed in this project to quantify agricultural demands and reservoir evaporation forecasts provide additional benefits to decision making beyond water supply forecasts? C) What benefit do ensemble forecasts have in the context of water management decisions?

  5. Integrating forest stand projections with wildlife occupancy models to develop a decision support tool

    Treesearch

    Michelle F. Tacconelli; Edward F. Loewenstein

    2012-01-01

    Natural resource managers must often balance multiple objectives on a single property. When these objectives are seemingly conflicting, the manager’s job can be extremely difficult and complex. This paper presents a decision support tool, designed to aid land managers in optimizing wildlife habitat needs while accomplishing additional objectives such as ecosystem...

  6. Moving Forward on a National Strategy for Developing Essential Skills

    ERIC Educational Resources Information Center

    Taylor, Maurice; Taschereau, Suzanne

    2014-01-01

    This pan Canadian participatory action research project involved faculty and managers in twelve Canadian colleges and institutes, nine employers, and 1300 students and workers in examining exemplary practice in essential skills as a way of catalyzing system change. Multiple sources of data were used in the three year project and key findings…

  7. Collaborative engineering and design management for the Hobby-Eberly Telescope tracker upgrade

    NASA Astrophysics Data System (ADS)

    Mollison, Nicholas T.; Hayes, Richard J.; Good, John M.; Booth, John A.; Savage, Richard D.; Jackson, John R.; Rafal, Marc D.; Beno, Joseph H.

    2010-07-01

    The engineering and design of systems as complex as the Hobby-Eberly Telescope's* new tracker require that multiple tasks be executed in parallel and overlapping efforts. When the design of individual subsystems is distributed among multiple organizations, teams, and individuals, challenges can arise with respect to managing design productivity and coordinating successful collaborative exchanges. This paper focuses on design management issues and current practices for the tracker design portion of the Hobby-Eberly Telescope Wide Field Upgrade project. The scope of the tracker upgrade requires engineering contributions and input from numerous fields including optics, instrumentation, electromechanics, software controls engineering, and site-operations. Successful system-level integration of tracker subsystems and interfaces is critical to the telescope's ultimate performance in astronomical observation. Software and process controls for design information and workflow management have been implemented to assist the collaborative transfer of tracker design data. The tracker system architecture and selection of subsystem interfaces has also proven to be a determining factor in design task formulation and team communication needs. Interface controls and requirements change controls will be discussed, and critical team interactions are recounted (a group-participation Failure Modes and Effects Analysis [FMEA] is one of special interest). This paper will be of interest to engineers, designers, and managers engaging in multi-disciplinary and parallel engineering projects that require coordination among multiple individuals, teams, and organizations.

  8. Great Basin Integrated Landscape Monitoring Pilot Summary Report

    USGS Publications Warehouse

    Finn, Sean P.; Kitchell, Kate; Baer, Lori Anne; Bedford, David R.; Brooks, Matthew L.; Flint, Alan L.; Flint, Lorraine E.; Matchett, J.R.; Mathie, Amy; Miller, David M.; Pilliod, David S.; Torregrosa, Alicia; Woodward, Andrea

    2010-01-01

    The Great Basin Integrated Landscape Monitoring Pilot project (GBILM) was one of four regional pilots to implement the U.S. Geological Survey (USGS) Science Thrust on Integrated Landscape Monitoring (ILM) whose goal was to observe, understand, and predict landscape change and its implications on natural resources at multiple spatial and temporal scales and address priority natural resource management and policy issues. The Great Basin is undergoing rapid environmental change stemming from interactions among global climate trends, increasing human populations, expanding and accelerating land and water uses, invasive species, and altered fire regimes. GBLIM tested concepts and developed tools to store and analyze monitoring data, understand change at multiple scales, and forecast landscape change. The GBILM endeavored to develop and test a landscape-level monitoring approach in the Great Basin that integrates USGS disciplines, addresses priority management questions, catalogs and uses existing monitoring data, evaluates change at multiple scales, and contributes to development of regional monitoring strategies. GBILM functioned as an integrative team from 2005 to 2010, producing more than 35 science and data management products that addressed pressing ecosystem drivers and resource management agency needs in the region. This report summarizes the approaches and methods of this interdisciplinary effort, identifies and describes the products generated, and provides lessons learned during the project.

  9. Smart Energy Management of Multiple Full Cell Powered Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MOhammad S. Alam

    2007-04-23

    In this research project the University of South Alabama research team has been investigating smart energy management and control of multiple fuel cell power sources when subjected to varying demands of electrical and thermal loads together with demands of hydrogen production. This research has focused on finding the optimal schedule of the multiple fuel cell power plants in terms of electric, thermal and hydrogen energy. The optimal schedule is expected to yield the lowest operating cost. Our team is also investigating the possibility of generating hydrogen using photoelectrochemical (PEC) solar cells through finding materials for efficient light harvesting photoanodes. Themore » goal is to develop an efficient and cost effective PEC solar cell system for direct electrolysis of water. In addition, models for hydrogen production, purification, and storage will be developed. The results obtained and the data collected will be then used to develop a smart energy management algorithm whose function is to maximize energy conservation within a managed set of appliances, thereby lowering O/M costs of the Fuel Cell power plant (FCPP), and allowing more hydrogen generation opportunities. The Smart Energy Management and Control (SEMaC) software, developed earlier, controls electrical loads in an individual home to achieve load management objectives such that the total power consumption of a typical residential home remains below the available power generated from a fuel cell. In this project, the research team will leverage the SEMaC algorithm developed earlier to create a neighborhood level control system.« less

  10. A residency clinic chronic condition management quality improvement project.

    PubMed

    Halverson, Larry W; Sontheimer, Dan; Duvall, Sharon

    2007-02-01

    Quality improvement in chronic disease management is a major agenda for improving health and reducing health care costs. A six-component chronic disease management model can help guide this effort. Several characteristics of the "new model" of family medicine described by the Future of Family Medicine (FFM) Project Leadership Committee are promulgated to foster practice changes that improve quality. Our objective was to implement and assess a quality improvement project guided by the components of a chronic disease management model and FFM new model characteristics. Diabetes was selected as a model chronic disease focus. Multiple practice changes were implemented. A mature electronic medical record facilitated data collection and measurement of quality improvement progress. Data from the diabetes registry demonstrates that our efforts have been effective. Significant improvement occurred in five out of six quality indicators. Multidisciplinary teamwork in a model residency practice guided by chronic disease management principles and the FFM new model characteristics can produce significant management improvements in one important chronic disease.

  11. Information Management System Supporting a Multiple Property Survey Program with Legacy Radioactive Contamination.

    PubMed

    Stager, Ron; Chambers, Douglas; Wiatzka, Gerd; Dupre, Monica; Callough, Micah; Benson, John; Santiago, Erwin; van Veen, Walter

    2017-04-01

    The Port Hope Area Initiative is a project mandated and funded by the Government of Canada to remediate properties with legacy low-level radioactive waste contamination in the Town of Port Hope, Ontario. The management and use of large amounts of data from surveys of some 4800 properties is a significant task critical to the success of the project. A large amount of information is generated through the surveys, including scheduling individual field visits to the properties, capture of field data laboratory sample tracking, QA/QC, property report generation and project management reporting. Web-mapping tools were used to track and display temporal progress of various tasks and facilitated consideration of spatial associations of contamination levels. The IM system facilitated the management and integrity of the large amounts of information collected, evaluation of spatial associations, automated report reproduction and consistent application and traceable execution for this project.x. © The Author 2017. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  12. NeuroManager: a workflow analysis based simulation management engine for computational neuroscience

    PubMed Central

    Stockton, David B.; Santamaria, Fidel

    2015-01-01

    We developed NeuroManager, an object-oriented simulation management software engine for computational neuroscience. NeuroManager automates the workflow of simulation job submissions when using heterogeneous computational resources, simulators, and simulation tasks. The object-oriented approach (1) provides flexibility to adapt to a variety of neuroscience simulators, (2) simplifies the use of heterogeneous computational resources, from desktops to super computer clusters, and (3) improves tracking of simulator/simulation evolution. We implemented NeuroManager in MATLAB, a widely used engineering and scientific language, for its signal and image processing tools, prevalence in electrophysiology analysis, and increasing use in college Biology education. To design and develop NeuroManager we analyzed the workflow of simulation submission for a variety of simulators, operating systems, and computational resources, including the handling of input parameters, data, models, results, and analyses. This resulted in 22 stages of simulation submission workflow. The software incorporates progress notification, automatic organization, labeling, and time-stamping of data and results, and integrated access to MATLAB's analysis and visualization tools. NeuroManager provides users with the tools to automate daily tasks, and assists principal investigators in tracking and recreating the evolution of research projects performed by multiple people. Overall, NeuroManager provides the infrastructure needed to improve workflow, manage multiple simultaneous simulations, and maintain provenance of the potentially large amounts of data produced during the course of a research project. PMID:26528175

  13. NeuroManager: a workflow analysis based simulation management engine for computational neuroscience.

    PubMed

    Stockton, David B; Santamaria, Fidel

    2015-01-01

    We developed NeuroManager, an object-oriented simulation management software engine for computational neuroscience. NeuroManager automates the workflow of simulation job submissions when using heterogeneous computational resources, simulators, and simulation tasks. The object-oriented approach (1) provides flexibility to adapt to a variety of neuroscience simulators, (2) simplifies the use of heterogeneous computational resources, from desktops to super computer clusters, and (3) improves tracking of simulator/simulation evolution. We implemented NeuroManager in MATLAB, a widely used engineering and scientific language, for its signal and image processing tools, prevalence in electrophysiology analysis, and increasing use in college Biology education. To design and develop NeuroManager we analyzed the workflow of simulation submission for a variety of simulators, operating systems, and computational resources, including the handling of input parameters, data, models, results, and analyses. This resulted in 22 stages of simulation submission workflow. The software incorporates progress notification, automatic organization, labeling, and time-stamping of data and results, and integrated access to MATLAB's analysis and visualization tools. NeuroManager provides users with the tools to automate daily tasks, and assists principal investigators in tracking and recreating the evolution of research projects performed by multiple people. Overall, NeuroManager provides the infrastructure needed to improve workflow, manage multiple simultaneous simulations, and maintain provenance of the potentially large amounts of data produced during the course of a research project.

  14. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  15. Mapping habitat for multiple species in the Desert Southwest

    USGS Publications Warehouse

    Inman, Richard D.; Nussear, Kenneth E.; Esque, Todd C.; Vandergast, Amy G.; Hathaway, Stacie A.; Wood, Dustin A.; Barr, Kelly R.; Fisher, Robert N.

    2014-01-01

    Many utility scale renewable energy projects are currently proposed across the Mojave Ecoregion. Agencies that manage biological resources throughout this region need to understand the potential impacts of these renewable energy projects and their associated infrastructure (for example, transmission corridors, substations, access roads, etc.) on species movement, genetic exchange among populations, and species’ abilities to adapt to changing environmental conditions. Understanding these factors will help managers’ select appropriate project sites and possibly mitigate for anticipated effects of management activities. We used species distribution models to map habitat for 15 species across the Mojave Ecoregion to aid regional land-use management planning. Models were developed using a common 1 × 1 kilometer resolution with maximum entropy and generalized additive models. Occurrence data were compiled from multiple sources, including VertNet (http://vertnet.org/), HerpNET (http://www.herpnet.org), and MaNIS (http://manisnet.org), as well as from internal U.S. Geological Survey databases and other biologists. Background data included 20 environmental covariates representing terrain, vegetation, and climate covariates. This report summarizes these environmental covariates and species distribution models used to predict habitat for the 15 species across the Mojave Ecoregion.

  16. Kalman approach to accuracy management for interoperable heterogeneous model abstraction within an HLA-compliant simulation

    NASA Astrophysics Data System (ADS)

    Leskiw, Donald M.; Zhau, Junmei

    2000-06-01

    This paper reports on results from an ongoing project to develop methodologies for representing and managing multiple, concurrent levels of detail and enabling high performance computing using parallel arrays within distributed object-based simulation frameworks. At this time we present the methodology for representing and managing multiple, concurrent levels of detail and modeling accuracy by using a representation based on the Kalman approach for estimation. The Kalman System Model equations are used to represent model accuracy, Kalman Measurement Model equations provide transformations between heterogeneous levels of detail, and interoperability among disparate abstractions is provided using a form of the Kalman Update equations.

  17. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - AMS Testbed Detailed Requirements

    DOT National Transportation Integrated Search

    2016-04-20

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  18. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - Chicago testbed analysis plan.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  19. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - evaluation plan : draft report.

    DOT National Transportation Integrated Search

    2016-07-13

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  20. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs — evaluation summary for DMA program.

    DOT National Transportation Integrated Search

    2017-07-04

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of Dynamic Mobility Application (DMA) connected vehicle applications and Active Transportation and Demand management (ATDM)...

  1. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - San Diego calibration report.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  2. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs : summary report for the Chicago testbed.

    DOT National Transportation Integrated Search

    2017-04-01

    The primary objective of this project is to develop multiple simulation testbeds and transportation models to evaluate the impacts of Connected Vehicle Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) strateg...

  3. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs : Evaluation Report for the Chicago Testbed

    DOT National Transportation Integrated Search

    2017-04-01

    The primary objective of this project is to develop multiple simulation testbeds and transportation models to evaluate the impacts of Connected Vehicle Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) strateg...

  4. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs — Chicago calibration report.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  5. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - Pasadena testbed analysis plan : final report.

    DOT National Transportation Integrated Search

    2016-06-30

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  6. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs — evaluation report for ATDM program.

    DOT National Transportation Integrated Search

    2017-07-16

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of Dynamic Mobility Applications (DMA) and the Active Transportation and Demand Management (ATDM) strategies. Specifically,...

  7. Managing the University Campus: Exploring Models for the Future and Supporting Today's Decisions

    ERIC Educational Resources Information Center

    den Heijer, Alexandra

    2012-01-01

    Managing contemporary campuses and taking decisions that will impact on those of tomorrow is a complex task for universities worldwide. It involves strategic, financial, functional and physical aspects as well as multiple stakeholders. This article summarises the conclusions of a comprehensive PhD research project which was enriched with lessons…

  8. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - San Diego testbed analysis plan.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  9. Remote sensing for restoration planning: how the big picture can inform stakeholders

    Treesearch

    Susan Cordell; Erin J. Questad; Gregory P. Asner; Kealoha M. Kinney; Jarrod M. Thaxton; Amanda Uowolo; Sam Brooks; Mark W. Chynoweth

    2016-01-01

    The use of remote sensing in ecosystem management has transformed how land managers, practitioners, and policymakers evaluate ecosystem loss, gain, and change at multiple spatial and temporal scales. Less developed is the use of these spatial tools for planning, implementing, and evaluating ecosystem restoration projects and especially so in multifunctional...

  10. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs — evaluation summary for ATDM program.

    DOT National Transportation Integrated Search

    2017-07-04

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of Dynamic Mobility Application (DMA) connected vehicle applications and Active Transportation and Dynamic management (ATDM...

  11. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - AMS Testbed Selection Criteria

    DOT National Transportation Integrated Search

    2016-06-16

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  12. A Multi-criterial Decision Support System for Forest Management

    Treesearch

    Donald Nute; Geneho Kim; Walter D. Potter; Mark J. Twery; H. Michael Rauscher; Scott Thomasma; Deborah Bennett; Peter Kollasch

    1999-01-01

    We describe a research project that has as its goal development of a full-featured decision support system for managing forested land to satisfy multiple criteria represented as timber, wildlife, water, ecological, and wildlife objectives. The decision process proposed for what was originally conceived of as a Northeast Decision Model (NED) includes data acquisition,...

  13. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs : Dallas testbed analysis plan.

    DOT National Transportation Integrated Search

    2016-06-16

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate theimpacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM)strategies. The outputs (mo...

  14. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - Pasadena calibration report : draft report.

    DOT National Transportation Integrated Search

    2017-03-01

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active transportation and demand management (ATDM) strategies. The primary pu...

  15. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs — evaluation report for DMA program.

    DOT National Transportation Integrated Search

    2017-02-02

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  16. Candidate biomarker discovery and selection for ‘Granny Smith' superficial scald risk management and diagnosis, poster board

    USDA-ARS?s Scientific Manuscript database

    Discovery of candidate biomarkers for superficial scald, a peel disorder that develops during storage of susceptible apple cultivars, is part of a larger project aimed at developing biomarker-based risk-management and diagnostic tools for multiple apple postharvest disorders (http://www.tfrec.wsu.ed...

  17. Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories

    NASA Astrophysics Data System (ADS)

    Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly

    The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.

  18. Staff - Jennifer E. Athey | Alaska Division of Geological & Geophysical

    Science.gov Websites

    multiple data management projects from digital field data collection to data compilation projects to Surveys Digital Data Series 14, http://doi.org/10.14509/photodb. http://doi.org/10.14509/29735 Athey, J.E increasing communication about digital geologic field mapping, in Soller, D.R., ed. Digital Mapping

  19. User's operating procedures. Volume 1: Scout project information programs

    NASA Technical Reports Server (NTRS)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  20. Managing and learning with multiple models: Objectives and optimization algorithms

    USGS Publications Warehouse

    Probert, William J. M.; Hauser, C.E.; McDonald-Madden, E.; Runge, M.C.; Baxter, P.W.J.; Possingham, H.P.

    2011-01-01

    The quality of environmental decisions should be gauged according to managers' objectives. Management objectives generally seek to maximize quantifiable measures of system benefit, for instance population growth rate. Reaching these goals often requires a certain degree of learning about the system. Learning can occur by using management action in combination with a monitoring system. Furthermore, actions can be chosen strategically to obtain specific kinds of information. Formal decision making tools can choose actions to favor such learning in two ways: implicitly via the optimization algorithm that is used when there is a management objective (for instance, when using adaptive management), or explicitly by quantifying knowledge and using it as the fundamental project objective, an approach new to conservation.This paper outlines three conservation project objectives - a pure management objective, a pure learning objective, and an objective that is a weighted mixture of these two. We use eight optimization algorithms to choose actions that meet project objectives and illustrate them in a simulated conservation project. The algorithms provide a taxonomy of decision making tools in conservation management when there is uncertainty surrounding competing models of system function. The algorithms build upon each other such that their differences are highlighted and practitioners may see where their decision making tools can be improved. ?? 2010 Elsevier Ltd.

  1. An Automated Method for Identifying Inconsistencies within Diagrammatic Software Requirements Specifications

    NASA Technical Reports Server (NTRS)

    Zhang, Zhong

    1997-01-01

    The development of large-scale, composite software in a geographically distributed environment is an evolutionary process. Often, in such evolving systems, striving for consistency is complicated by many factors, because development participants have various locations, skills, responsibilities, roles, opinions, languages, terminology and different degrees of abstraction they employ. This naturally leads to many partial specifications or viewpoints. These multiple views on the system being developed usually overlap. From another aspect, these multiple views give rise to the potential for inconsistency. Existing CASE tools do not efficiently manage inconsistencies in distributed development environment for a large-scale project. Based on the ViewPoints framework the WHERE (Web-Based Hypertext Environment for requirements Evolution) toolkit aims to tackle inconsistency management issues within geographically distributed software development projects. Consequently, WHERE project helps make more robust software and support software assurance process. The long term goal of WHERE tools aims to the inconsistency analysis and management in requirements specifications. A framework based on Graph Grammar theory and TCMJAVA toolkit is proposed to detect inconsistencies among viewpoints. This systematic approach uses three basic operations (UNION, DIFFERENCE, INTERSECTION) to study the static behaviors of graphic and tabular notations. From these operations, subgraphs Query, Selection, Merge, Replacement operations can be derived. This approach uses graph PRODUCTIONS (rewriting rules) to study the dynamic transformations of graphs. We discuss the feasibility of implementation these operations. Also, We present the process of porting original TCM (Toolkit for Conceptual Modeling) project from C++ to Java programming language in this thesis. A scenario based on NASA International Space Station Specification is discussed to show the applicability of our approach. Finally, conclusion and future work about inconsistency management issues in WHERE project will be summarized.

  2. Governance and management dynamics of landscape restoration at multiple scales: Learning from successful environmental managers in Sweden.

    PubMed

    Dawson, Lucas; Elbakidze, Marine; Angelstam, Per; Gordon, Johanna

    2017-07-15

    Due to a long history of intensive land and water use, habitat networks for biodiversity conservation are generally degraded in Sweden. Landscape restoration (LR) is an important strategy for achieving representative and functional green infrastructures. However, outcomes of LR efforts are poorly studied, particularly the dynamics of LR governance and management. We apply systems thinking methods to a series of LR case studies to analyse the causal structures underlying LR governance and management in Sweden. We show that these structures appear to comprise of an interlinked system of at least three sets of drivers and four core processes. This system exhibits many characteristics of a transformative change towards an integrated, adaptive approach to governance and management. Key challenges for Swedish LR projects relate to institutional and regulatory flexibility, the timely availability of sufficient funds, and the management of learning and knowledge production processes. In response, successful project leaders develop several key strategies to manage complexity and risk, and enhance perceptions of the attractiveness of LR projects. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    PubMed

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  4. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    PubMed Central

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  5. Managing the effects of multiple stressors on aquatic ecosystems under water scarcity. The GLOBAQUA project.

    PubMed

    Navarro-Ortega, Alícia; Acuña, Vicenç; Bellin, Alberto; Burek, Peter; Cassiani, Giorgio; Choukr-Allah, Redouane; Dolédec, Sylvain; Elosegi, Arturo; Ferrari, Federico; Ginebreda, Antoni; Grathwohl, Peter; Jones, Colin; Rault, Philippe Ker; Kok, Kasper; Koundouri, Phoebe; Ludwig, Ralf Peter; Merz, Ralf; Milacic, Radmila; Muñoz, Isabel; Nikulin, Grigory; Paniconi, Claudio; Paunović, Momir; Petrovic, Mira; Sabater, Laia; Sabaterb, Sergi; Skoulikidis, Nikolaos Th; Slob, Adriaan; Teutsch, Georg; Voulvoulis, Nikolaos; Barceló, Damià

    2015-01-15

    Water scarcity is a serious environmental problem in many European regions, and will likely increase in the near future as a consequence of increased abstraction and climate change. Water scarcity exacerbates the effects of multiple stressors, and thus results in decreased water quality. It impacts river ecosystems, threatens the services they provide, and it will force managers and policy-makers to change their current practices. The EU-FP7 project GLOBAQUA aims at identifying the prevalence, interaction and linkages between stressors, and to assess their effects on the chemical and ecological status of freshwater ecosystems in order to improve water management practice and policies. GLOBAQUA assembles a multidisciplinary team of 21 European plus 2 non-European scientific institutions, as well as water authorities and river basin managers. The project includes experts in hydrology, chemistry, biology, geomorphology, modelling, socio-economics, governance science, knowledge brokerage, and policy advocacy. GLOBAQUA studies six river basins (Ebro, Adige, Sava, Evrotas, Anglian and Souss Massa) affected by water scarcity, and aims to answer the following questions: how does water scarcity interact with other existing stressors in the study river basins? How will these interactions change according to the different scenarios of future global change? Which will be the foreseeable consequences for river ecosystems? How will these in turn affect the services the ecosystems provide? How should management and policies be adapted to minimise the ecological, economic and societal consequences? These questions will be approached by combining data-mining, field- and laboratory-based research, and modelling. Here, we outline the general structure of the project and the activities to be conducted within the fourteen work-packages of GLOBAQUA. Copyright © 2014. Published by Elsevier B.V.

  6. Managing the effects of multiple stressors on aquatic ecosystems under water scarcity. The GLOBAQUA project

    PubMed Central

    Navarro-Ortega, Alícia; Acuña, Vicenç; Bellin, Alberto; Burek, Peter; Cassiani, Giorgio; Choukr-Allah, Redouane; Dolédec, Sylvain; Elosegi, Arturo; Ferrari, Federico; Ginebreda, Antoni; Grathwohl, Peter; Jones, Colin; Rault, Philippe Ker; Kok, Kasper; Koundouri, Phoebe; Ludwig, Ralf Peter; Merz, Ralf; Milacic, Radmila; Muñoz, Isabel; Nikulin, Grigory; Paniconi, Claudio; Paunović, Momir; Petrovic, Mira; Sabater, Laia; Sabaterb, Sergi; Skoulikidis, Nikolaos Th.; Slob, Adriaan; Teutsch, Georg; Voulvoulis, Nikolaos; Barceló, Damià

    2015-01-01

    Water scarcity is a serious environmental problem in many European regions, and will likely increase in the near future as a consequence of increased abstraction and climate change. Water scarcity exacerbates the effects of multiple stressors, and thus results in decreased water quality. It impacts river ecosystems, threatens the services they provide, and it will force managers and policy-makers to change their current practices. The EU-FP7 project GLOBAQUA aims at identifying the prevalence, interaction and linkages between stressors, and to assess their effects on the chemical and ecological status of freshwater ecosystems in order to improve water management practice and policies. GLOBAQUA assembles a multidisciplinary team of 21 European plus 2 non-European scientific institutions, as well as water authorities and river basin managers. The project includes experts in hydrology, chemistry, biology, geomorphology, modelling, socio-economics, governance science, knowledge brokerage, and policy advocacy. GLOBAQUA studies six river basins (Ebro, Adige, Sava, Evrotas, Anglian and Souss Massa) affected by water scarcity, and aims to answer the following questions: how does water scarcity interact with other existing stressors in the study river basins? How will these interactions change according to the different scenarios of future global change? Which will be the foreseeable consequences for river ecosystems? How will these in turn affect the services the ecosystems provide? How should management and policies be adapted to minimise the ecological, economic and societal consequences? These questions will be approached by combining data-mining, field- and laboratory-based research, and modelling. Here, we outline the general structure of the project and the activities to be conducted within the fourteen work-packages of GLOBAQUA. PMID:25005236

  7. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs — Calibration Report for San Mateo Testbed.

    DOT National Transportation Integrated Search

    2016-08-22

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  8. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - calibration report for Dallas testbed : final report.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  9. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs — gaps, challenges and future research.

    DOT National Transportation Integrated Search

    2017-05-01

    The primary objective of AMS project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. Through this p...

  10. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - Evaluation Report for the San Diego Testbed

    DOT National Transportation Integrated Search

    2017-07-01

    The primary objective of this project is to develop multiple simulation testbeds and transportation models to evaluate the impacts of Connected Vehicle Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) strateg...

  11. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs : Evaluation Report for the San Diego Testbed : Draft Report.

    DOT National Transportation Integrated Search

    2017-07-01

    The primary objective of this project is to develop multiple simulation testbeds and transportation models to evaluate the impacts of Connected Vehicle Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) strateg...

  12. Exploring the Theory-Practice Gap: Applications to Health Information Management/Technology Education and Training

    ERIC Educational Resources Information Center

    Green, Zakevia Denise

    2013-01-01

    Although research on the theory-practice gap is available across multiple disciplines, similar studies focusing on the profession of health information management/technology (HIM/T) are not yet available. The projected number of qualified HIM/T needed with advanced skills and training suggests that skillful use of electronic health records (EHR)…

  13. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - calibration Report for Phoenix Testbed : Final Report.

    DOT National Transportation Integrated Search

    2016-10-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  14. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic mobility applications (DMA) and active transportation and demand management (ATDM) programs - evaluation summary for the San Diego testbed

    DOT National Transportation Integrated Search

    2017-08-01

    The primary objective of this project is to develop multiple simulation testbeds and transportation models to evaluate the impacts of Connected Vehicle Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) strateg...

  15. Analysis, modeling, and simulation (AMS) testbed development and evaluation to support dynamic applications (DMA) and active transportation and demand management (ATDM) programs — leveraging AMS testbed outputs for ATDM analysis – a primer.

    DOT National Transportation Integrated Search

    2017-08-01

    The primary objective of AMS Testbed project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. Throug...

  16. Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs - San Mateo Testbed Analysis Plan : Final Report.

    DOT National Transportation Integrated Search

    2016-06-29

    The primary objective of this project is to develop multiple simulation testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  17. SunLine Expands Horizons with Fuel Cell Bus Demo

    DOT National Transportation Integrated Search

    2006-05-01

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  18. Clinical nursing leaders', team members' and service managers' experiences of implementing evidence at a local level.

    PubMed

    Kitson, Alison; Silverston, Heidi; Wiechula, Rick; Zeitz, Kathryn; Marcoionni, Danni; Page, Tammy

    2011-05-01

    To describe the experiences of 14 clinical nursing leaders introducing a knowledge translation (KT) project into one metropolitan acute care hospital in South Australia. The study also explored team members' and service managers' experiences. KT strategies assume that local (nursing) clinical leaders have the capacity and capability to champion innovation combining positional leadership roles (ward leader) with a project lead role. There is limited evidence to support these assumptions. Semi-structured interviews of clinical nursing leaders and managers were undertaken at month 4 and 12 of the project. Data were also collected from the interdisciplinary team members (n = 28). Clinical nursing leaders identified risks and anxieties associated with taking on an additional leadership role, whereas managers acknowledged the multiple pressures on the system and the need for local level innovation. Team members generally reported positive experiences. With support, clinical nursing leaders can effectively embrace KT project leadership roles that complement their positional leadership roles. Clinical nursing leaders' experiences differed from nursing and medical managers' experiences.   Managers need to be more attuned to the personal risks local leaders experience, providing support for leaders to experiment and innovate. Managers need to integrate local priorities with broader system wide agendas. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  19. Assessing risk from a stakeholder perspective

    NASA Technical Reports Server (NTRS)

    Cooper, L. P.

    2003-01-01

    Planetary exploration missions are subject to a vast array of interpretations of 'success' based on the concerns of multiple stakeholder groups. While project risk management generally focuses on issues of cost/schedule constraints or reliability issues, a broader interpretation of 'risk' as it applies to stakeholders such as sponsors (e.g., NASA), the public at large, the scientific community, the home organization, and the project team itself can provide important insights into the full spectrum of risk that needs to be managed. This paper presents a stakeholder view of risk which is divided into failure, not-a-failure, success, and stunning-success zones. Using the Mars Pathfinder mission as an example, an alternative interpretation of the risks to that mission is presented from the view of key stakeholders. The implications of the stakeholder perspective to project risk management are addressed.

  20. Success in large high-technology projects: What really works?

    NASA Astrophysics Data System (ADS)

    Crosby, P.

    2014-08-01

    Despite a plethora of tools, technologies and management systems, successful execution of big science and engineering projects remains problematic. The sheer scale of globally funded projects such as the Large Hadron Collider and the Square Kilometre Array telescope means that lack of project success can impact both on national budgets, and collaborative reputations. In this paper, I explore data from contemporary literature alongside field research from several current high-technology projects in Europe and Australia, and reveal common `pressure points' that are shown to be key influencers of project control and success. I discuss the how mega-science projects sit between being merely complicated, and chaotic, and explain the importance of understanding multiple dimensions of project complexity. Project manager/leader traits are briefly discussed, including capability to govern and control such enterprises. Project structures are examined, including the challenge of collaborations. I show that early attention to building project resilience, curbing optimism, and risk alertness can help prepare large high-tech projects against threats, and why project managers need to understand aspects of `the silent power of time'. Mission assurance is advanced as a critical success function, alongside the deployment of task forces and new combinations of contingency plans. I argue for increased project control through industrial-style project reviews, and show how post-project reviews are an under-used, yet invaluable avenue of personal and organisational improvement. Lastly, I discuss the avoidance of project amnesia through effective capture of project knowledge, and transfer of lessons-learned to subsequent programs and projects.

  1. Project Management Using Modern Guidance, Navigation and Control Theory

    NASA Technical Reports Server (NTRS)

    Hill, Terry

    2010-01-01

    The idea of control theory and its application to project management is not new, however literature on the topic and real-world applications is not as readily available and comprehensive in how all the principals of Guidance, Navigation and Control (GN&C) apply. This paper will address how the fundamental principals of modern GN&C Theory have been applied to NASA's Constellation Space Suit project and the results in the ability to manage the project within cost, schedule and budget. A s with physical systems, projects can be modeled and managed with the same guiding principles of GN&C as if it were a complex vehicle, system or software with time-varying processes, at times non-linear responses, multiple data inputs of varying accuracy and a range of operating points. With such systems the classic approach could be applied to small and well-defined projects; however with larger, multi-year projects involving multiple organizational structures, external influences and a multitude of diverse resources, then modern control theory is required to model and control the project. The fundamental principals of G N&C stated that a system is comprised of these basic core concepts: State, Behavior, Control system, Navigation system, Guidance and Planning Logic, Feedback systems. The state of a system is a definition of the aspects of the dynamics of the system that can change, such as position, velocity, acceleration, coordinate-based attitude, temperature, etc. The behavior of the system is more of what changes are possible rather than what can change, which is captured in the state of the system. The behavior of a system is captured in the system modeling and if properly done, will aid in accurate system performance prediction in the future. The Control system understands the state and behavior of the system and feedback systems to adjust the control inputs into the system. The Navigation system takes the multiple data inputs and based upon a priori knowledge of the input, will develop a statistical-based weighting of the input to determine where the system currently is located. Guidance and Planning logic of the system with the understanding of where it is (provided by the navigation system) will in turn determine where it needs to be and how to get there. Lastly, the system Feedback system is the right arm of the control system to allow it to affect change in the overall system and therefore it is critical to not only correctly identify the system feedback inputs but also the system response to the feedback inputs. And with any systems project it is critical that the objective of the system be clearly defined for not only planning but to be used to measure performance and to aid in the guidance of the system or project.

  2. Science of Integrated Approaches to Natural Resources Management

    NASA Astrophysics Data System (ADS)

    Tengberg, Anna; Valencia, Sandra

    2017-04-01

    To meet multiple environmental objectives, integrated programming is becoming increasingly important for the Global Environmental Facility (GEF), the financial mechanism of the multilateral environmental agreements, including the United Nations Convention to Combat Desertification (UNCCD). Integration of multiple environmental, social and economic objectives also contributes to the achievement of the Sustainable Development Goals (SDGs) in a timely and cost-effective way. However, integration is often not well defined. This paper therefore focuses on identifying key aspects of integration and assessing their implementation in natural resources management (NRM) projects. To that end, we draw on systems thinking literature, and carry out an analysis of a random sample of GEF integrated projects and in-depth case studies demonstrating lessons learned and good practices in addressing land degradation and other NRM challenges. We identify numerous challenges and opportunities of integrated approaches that need to be addressed in order to maximise the catalytic impact of the GEF during problem diagnosis, project design, implementation and governance. We highlight the need for projects to identify clearer system boundaries and main feedback mechanisms within those boundaries, in order to effectively address drivers of environmental change. We propose a theory of change for Integrated Natural Resources Management (INRM) projects, where short-term environmental and socio-economic benefits will first accrue at the local level. Implementation of improved INRM technologies and practices at the local level can be extended through spatial planning, strengthening of innovation systems, and financing and incentive mechanisms at the watershed and/or landscape/seascape level to sustain and enhance ecosystem services at larger scales and longer time spans. We conclude that the evolving scientific understanding of factors influencing social, technical and institutional innovations and transitions towards sustainable management of natural resources should be harnessed and integrated into GEF's influencing models and theory of change, and be coupled with updated approaches for learning, adaptive management and scaling up.

  3. User's operating procedures. Volume 3: Projects directorate information programs

    NASA Technical Reports Server (NTRS)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  4. Projections of change in key ecosystem indicators for planning and management of marine protected areas: An example study for European seas

    NASA Astrophysics Data System (ADS)

    Kay, Susan; Butenschön, Momme

    2018-02-01

    Marine Protected Areas (MPAs) are widely used as tools to maintain biodiversity, protect habitats and ensure that development is sustainable. If MPAs are to maintain their role into the future it is important for managers to understand how conditions at these sites may change as a result of climate change and other drivers, and this understanding needs to extend beyond temperature to a range of key ecosystem indicators. This case study demonstrates how spatially-aggregated model results for multiple variables can provide useful projections for MPA planners and managers. Conditions in European MPAs have been projected for the 2040s using unmitigated and globally managed scenarios of climate change and river management, and hence high and low emissions of greenhouse gases and riverborne nutrients. The results highlight the vulnerability of potential refuge sites in the north-west Mediterranean and the need for careful monitoring at MPAs to the north and west of the British Isles, which may be affected by changes in Atlantic circulation patterns. The projections also support the need for more MPAs in the eastern Mediterranean and Adriatic Sea, and can inform the selection of sites.

  5. Proof Rolling of Foundation Soil and Prepared Subgrade During Construction

    DOT National Transportation Integrated Search

    2017-07-04

    The primary objective of this project is to develop multiple simulation testbeds and transportation models to evaluate the impacts of Connected Vehicle Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) strateg...

  6. Development and implementation of a residency project advisory board.

    PubMed

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  7. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    NASA Technical Reports Server (NTRS)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  8. Onshore and Offshore Outsourcing with Agility: Lessons Learned

    NASA Astrophysics Data System (ADS)

    Kussmaul, Clifton

    This chapter reflects on case study based an agile distributed project that ran for approximately three years (from spring 2003 to spring 2006). The project involved (a) a customer organization with key personnel distributed across the US, developing an application with rapidly changing requirements; (b) onshore consultants with expertise in project management, development processes, offshoring, and relevant technologies; and (c) an external offsite development team in a CMM-5 organization in southern India. This chapter is based on surveys and discussions with multiple participants. The several years since the project was completed allow greater perspective on both the strengths and weaknesses, since the participants can reflect on the entire life of the project, and compare it to subsequent experiences. Our findings emphasize the potential for agile project management in distributed software development, and the importance of people and interactions, taking many small steps to find and correct errors, and matching the structures of the project and product to support implementation of agility.

  9. Challenges and Experiences of Building Multidisciplinary Datasets across Cultures

    NASA Astrophysics Data System (ADS)

    Jamiyansharav, K.; Laituri, M.; Fernandez-Gimenez, M.; Fassnacht, S. R.; Venable, N. B. H.; Allegretti, A. M.; Reid, R.; Baival, B.; Jamsranjav, C.; Ulambayar, T.; Linn, S.; Angerer, J.

    2017-12-01

    Efficient data sharing and management are key challenges to multidisciplinary scientific research. These challenges are further complicated by adding a multicultural component. We address the construction of a complex database for social-ecological analysis in Mongolia. Funded by the National Science Foundation (NSF) Dynamics of Coupled Natural and Human (CNH) Systems, the Mongolian Rangelands and Resilience (MOR2) project focuses on the vulnerability of Mongolian pastoral systems to climate change and adaptive capacity. The MOR2 study spans over three years of fieldwork in 36 paired districts (Soum) from 18 provinces (Aimag) of Mongolia that covers steppe, mountain forest steppe, desert steppe and eastern steppe ecological zones. Our project team is composed of hydrologists, social scientists, geographers, and ecologists. The MOR2 database includes multiple ecological, social, meteorological, geospatial and hydrological datasets, as well as archives of original data and survey in multiple formats. Managing this complex database requires significant organizational skills, attention to detail and ability to communicate within collective team members from diverse disciplines and across multiple institutions in the US and Mongolia. We describe the database's rich content, organization, structure and complexity. We discuss lessons learned, best practices and recommendations for complex database management, sharing, and archiving in creating a cross-cultural and multi-disciplinary database.

  10. SMC Message Browser Projects

    NASA Technical Reports Server (NTRS)

    Wichmann, Benjamin C.

    2013-01-01

    I work directly with the System Monitoring and Control (SMC) software engineers who develop, test and release custom and commercial software in support of the Kennedy Space Center Spaceport Command and Control System. (SCCS). SMC uses Commercial Off-The-Shelf (COTS) Enterprise Management Systems (EMS) software which provides a centralized subsystem for configuring, monitoring, and controlling SCCS hardware and software used in the Control Rooms. There are multiple projects being worked on using the COTS EMS software. I am currently working with the HP Operations Manager for UNIX (OMU) software which allows Master Console Operators (MCO) to access, view and interpret messages regarding the status of the SCCS hardware and software. The OMU message browser gets cluttered with messages which can make it difficult for the MCO to manage. My main project involves determining ways to reduce the number of messages being displayed in the OMU message browser. I plan to accomplish this task in two different ways: (1) by correlating multiple messages into one single message being displayed and (2) to create policies that will determine the significance of each message and whether or not it needs to be displayed to the MCO. The core idea is to lessen the number of messages being sent to the OMU message browser so the MCO can more effectively use it.

  11. Demonstrating artificial intelligence for space systems - Integration and project management issues

    NASA Technical Reports Server (NTRS)

    Hack, Edmund C.; Difilippo, Denise M.

    1990-01-01

    As part of its Systems Autonomy Demonstration Project (SADP), NASA has recently demonstrated the Thermal Expert System (TEXSYS). Advanced real-time expert system and human interface technology was successfully developed and integrated with conventional controllers of prototype space hardware to provide intelligent fault detection, isolation, and recovery capability. Many specialized skills were required, and responsibility for the various phases of the project therefore spanned multiple NASA centers, internal departments and contractor organizations. The test environment required communication among many types of hardware and software as well as between many people. The integration, testing, and configuration management tools and methodologies which were applied to the TEXSYS project to assure its safe and successful completion are detailed. The project demonstrated that artificial intelligence technology, including model-based reasoning, is capable of the monitoring and control of a large, complex system in real time.

  12. A highly scalable information system as extendable framework solution for medical R&D projects.

    PubMed

    Holzmüller-Laue, Silke; Göde, Bernd; Stoll, Regina; Thurow, Kerstin

    2009-01-01

    For research projects in preventive medicine a flexible information management is needed that offers a free planning and documentation of project specific examinations. The system should allow a simple, preferably automated data acquisition from several distributed sources (e.g., mobile sensors, stationary diagnostic systems, questionnaires, manual inputs) as well as an effective data management, data use and analysis. An information system fulfilling these requirements has been developed at the Center for Life Science Automation (celisca). This system combines data of multiple investigations and multiple devices and displays them on a single screen. The integration of mobile sensor systems for comfortable, location-independent capture of time-based physiological parameter and the possibility of observation of these measurements directly by this system allow new scenarios. The web-based information system presented in this paper is configurable by user interfaces. It covers medical process descriptions, operative process data visualizations, a user-friendly process data processing, modern online interfaces (data bases, web services, XML) as well as a comfortable support of extended data analysis with third-party applications.

  13. QAIT: a quality assurance issue tracking tool to facilitate the improvement of clinical data quality.

    PubMed

    Zhang, Yonghong; Sun, Weihong; Gutchell, Emily M; Kvecher, Leonid; Kohr, Joni; Bekhash, Anthony; Shriver, Craig D; Liebman, Michael N; Mural, Richard J; Hu, Hai

    2013-01-01

    In clinical and translational research as well as clinical trial projects, clinical data collection is prone to errors such as missing data, and misinterpretation or inconsistency of the data. A good quality assurance (QA) program can resolve many such errors though this requires efficient communications between the QA staff and data collectors. Managing such communications is critical to resolving QA problems but imposes a major challenge for a project involving multiple clinical and data processing sites. We have developed a QA issue tracking (QAIT) system to support clinical data QA in the Clinical Breast Care Project (CBCP). This web-based application provides centralized management of QA issues with role-based access privileges. It has greatly facilitated the QA process and enhanced the overall quality of the CBCP clinical data. As a stand-alone system, QAIT can supplement any other clinical data management systems and can be adapted to support other projects. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  14. Development of a hybrid modeling approach for predicting intensively managed Douglas-fir growth at multiple scales.

    Treesearch

    A. Weiskittel; D. Maguire; R. Monserud

    2007-01-01

    Hybrid models offer the opportunity to improve future growth projections by combining advantages of both empirical and process-based modeling approaches. Hybrid models have been constructed in several regions and their performance relative to a purely empirical approach has varied. A hybrid model was constructed for intensively managed Douglas-fir plantations in the...

  15. The Anger Management Project: A Group Intervention for Anger in People with Physical and Multiple Disabilities

    ERIC Educational Resources Information Center

    Hagiliassis, Nick; Gulbenkoglu, Hrepsime; Di Marco, Mark; Young, Suzanne; Hudson, Alan

    2005-01-01

    Background: This paper describes the evaluation of a group program designed specifically to meet the anger management needs of a group of individuals with various levels of intellectual disability and/or complex communication needs. Method: Twenty-nine individuals were randomly assigned to an intervention group or a waiting-list comparison group.…

  16. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  17. Biodiesel Research : Alternative Fuels & Life-Cycle Engineering Program : November 29, 2006 to November 28, 2011

    DOT National Transportation Integrated Search

    2011-12-20

    The primary objective of this project is to develop multiple simulation Testbeds/transportation models to evaluate the impacts of DMA connected vehicle applications and the active and dynamic transportation management (ATDM) strategies. The outputs (...

  18. Agile Metrics: Progress Monitoring of Agile Contractors

    DTIC Science & Technology

    2014-01-01

    epic. The short timeframe is usually called an itera- tion or, in Scrum -based teams, a sprint; multiple iterations make up a release [Lapham 2011...9769 [Rawsthorne 2012] Rawsthorne, Dan. Monitoring Scrum Projects with AgileEVM and Earned Business Value Metrics (EBV). 2012. http...AgileEVM – Earned Value Manage- ment in Scrum Projects.” Presented at Agile2006, 23-28 July 2006. [USAF 2008] United States Air Force. United

  19. User's operating procedures. Volume 2: Scout project financial analysis program

    NASA Technical Reports Server (NTRS)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  20. Exploring role confusion in nurse case management.

    PubMed

    Gray, Frances C; White, Ann; Brooks-Buck, Judith

    2013-01-01

    This is a report of the results of a pilot project conducted to identify the areas where role confusion/ambiguity exists in the practice of nurse case management. A convenience sample of 25 registered nurses practicing as case managers in a small east coast medical treatment facility's outpatient clinics. Participants responded to 2 Likert-type surveys designed to evaluate role confusion from an individual and a team membership perspective. Analysis indicated that nurse case managers experience role confusion in the specific areas of conflicts between time resources, capabilities, and multiple individual roles. There was no identified role confusion associated with membership on multidisciplinary teams. The application of the Synergy Model as a theoretical framework for nurse case management serves as a benchmark for the implementation of evidence-based practices. This project could serve as the starting point for the development of a skill set for nurse case managers, for the standardization of the practice, and for the recognition of nurse case management as a legitimate nursing subspecialty.

  1. LabVIEW Task Manager v. 1.10.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, Timothy D.

    LabVIEW Task Manager is a debugging tool for use during code development in the National Instruments (NI) LabVIEW® IDE. While providing a dynamic & big-picture view of running code, an expandable/collapsible tree diagram displays detailed information (both static and dynamic) on all VIs in memory, belonging to a selected project/target. It allows for interacting with single or multiple selected VIs at a time, providing significant benefits while troubleshooting, and has the following features: Look & Feel similar to Windows® Task Manager; Selection of project/target; Lists all VIs in memory, grouped by class/library; Searches for and enumerates clones in memory; DropInmore » VI for including dynamically referenced clones (Clone Beacon); 'Refresh Now' (F5) re-reads all VIs in memory and adds new ones to the tree; Displays VI name, owning class/library, state, path, data size & code size; Displays VI FP Behavior, Reentrant?, Reentrancy Type, Paused? & Highlight?; Sort by any column, including by library name; Filter by item types vi, ctl, and vit/ctt; Filter out vi.lib and global VIs; Tracking of, and ability to toggle, execution highlighting on multiple selected VIs; Tracking of paused VIs with ability to Pause/Resume/TogglePause multiple selected VIs; DropIn VI for pausing on a condition; If a clone initiates a pause, a different pause symbol is used for all clones of that same reentrant original VI; Select multiple VIs and open or close their FPs or BDs; Double Click a VI from the tree to bring the BD (first choice) or FP to front, if already open; and Select multiple top-level VIs and Abort them.« less

  2. The Ophidia Stack: Toward Large Scale, Big Data Analytics Experiments for Climate Change

    NASA Astrophysics Data System (ADS)

    Fiore, S.; Williams, D. N.; D'Anca, A.; Nassisi, P.; Aloisio, G.

    2015-12-01

    The Ophidia project is a research effort on big data analytics facing scientific data analysis challenges in multiple domains (e.g. climate change). It provides a "datacube-oriented" framework responsible for atomically processing and manipulating scientific datasets, by providing a common way to run distributive tasks on large set of data fragments (chunks). Ophidia provides declarative, server-side, and parallel data analysis, jointly with an internal storage model able to efficiently deal with multidimensional data and a hierarchical data organization to manage large data volumes. The project relies on a strong background on high performance database management and On-Line Analytical Processing (OLAP) systems to manage large scientific datasets. The Ophidia analytics platform provides several data operators to manipulate datacubes (about 50), and array-based primitives (more than 100) to perform data analysis on large scientific data arrays. To address interoperability, Ophidia provides multiple server interfaces (e.g. OGC-WPS). From a client standpoint, a Python interface enables the exploitation of the framework into Python-based eco-systems/applications (e.g. IPython) and the straightforward adoption of a strong set of related libraries (e.g. SciPy, NumPy). The talk will highlight a key feature of the Ophidia framework stack: the "Analytics Workflow Management System" (AWfMS). The Ophidia AWfMS coordinates, orchestrates, optimises and monitors the execution of multiple scientific data analytics and visualization tasks, thus supporting "complex analytics experiments". Some real use cases related to the CMIP5 experiment will be discussed. In particular, with regard to the "Climate models intercomparison data analysis" case study proposed in the EU H2020 INDIGO-DataCloud project, workflows related to (i) anomalies, (ii) trend, and (iii) climate change signal analysis will be presented. Such workflows will be distributed across multiple sites - according to the datasets distribution - and will include intercomparison, ensemble, and outlier analysis. The two-level workflow solution envisioned in INDIGO (coarse grain for distributed tasks orchestration, and fine grain, at the level of a single data analytics cluster instance) will be presented and discussed.

  3. Framework for Automation of Hazard Log Management on Large Critical Projects

    NASA Astrophysics Data System (ADS)

    Vinerbi, Lorenzo; Babu, Arun P.

    2016-08-01

    Hazard log is a database of all risk management activities in a project. Maintaining its correctness and consistency on large safety/mission critical projects involving multiple vendors, suppliers, and partners is critical and challenging. IBM DOORS is one of the popular tool used for hazard management in space applications. However, not all stake- holders are familiar with it. Also, It is not always feasible to expect all stake-holders to provide correct and consistent hazard data.The current work describes the process and tools to simplify the process of hazard data collection on large projects. It demonstrates how the collected data from all stake-holders is merged to form the hazard log while ensuring data consistency and correctness.The data provided by all parties are collected using a template containing scripts. The scripts check for mistakes based on internal standards of company in charge of hazard management. The collected data is then subjected to merging in DOORS, which also contain scripts to check and import data to form the hazard log. The proposed tool has been applied to a mission critical project, and has been found to save time and reduce the number of mistakes while creating the hazard log. The use of automatic checks paves the way for correct tracking of risk and hazard analysis activities for large critical projects.

  4. Leaf LIMS: A Flexible Laboratory Information Management System with a Synthetic Biology Focus.

    PubMed

    Craig, Thomas; Holland, Richard; D'Amore, Rosalinda; Johnson, James R; McCue, Hannah V; West, Anthony; Zulkower, Valentin; Tekotte, Hille; Cai, Yizhi; Swan, Daniel; Davey, Robert P; Hertz-Fowler, Christiane; Hall, Anthony; Caddick, Mark

    2017-12-15

    This paper presents Leaf LIMS, a flexible laboratory information management system (LIMS) designed to address the complexity of synthetic biology workflows. At the project's inception there was a lack of a LIMS designed specifically to address synthetic biology processes, with most systems focused on either next generation sequencing or biobanks and clinical sample handling. Leaf LIMS implements integrated project, item, and laboratory stock tracking, offering complete sample and construct genealogy, materials and lot tracking, and modular assay data capture. Hence, it enables highly configurable task-based workflows and supports data capture from project inception to completion. As such, in addition to it supporting synthetic biology it is ideal for many laboratory environments with multiple projects and users. The system is deployed as a web application through Docker and is provided under a permissive MIT license. It is freely available for download at https://leaflims.github.io .

  5. Projecting cumulative benefits of multiple river restoration projects: an example from the Sacramento-San Joaquin River system in California

    USGS Publications Warehouse

    Kondolf, G. Mathias; Angermeier, Paul L.; Cummins, Kenneth; Dunne, Thomas; Healey, Michael; Kimmerer, Wim; Moyle, Peter B.; Murphy, Dennis; Patten, Duncan; Railsback, Steve F.; Reed, Denise J.; Spies, Robert B.; Twiss, Robert

    2008-01-01

    Despite increasingly large investments, the potential ecological effects of river restoration programs are still small compared to the degree of human alterations to physical and ecological function. Thus, it is rarely possible to “restore” pre-disturbance conditions; rather restoration programs (even large, well-funded ones) will nearly always involve multiple small projects, each of which can make some modest change to selected ecosystem processes and habitats. At present, such projects are typically selected based on their attributes as individual projects (e.g., consistency with programmatic goals of the funders, scientific soundness, and acceptance by local communities), and ease of implementation. Projects are rarely prioritized (at least explicitly) based on how they will cumulatively affect ecosystem function over coming decades. Such projections require an understanding of the form of the restoration response curve, or at least that we assume some plausible relations and estimate cumulative effects based thereon. Drawing on our experience with the CALFED Bay-Delta Ecosystem Restoration Program in California, we consider potential cumulative system-wide benefits of a restoration activity extensively implemented in the region: isolating/filling abandoned floodplain gravel pits captured by rivers to reduce predation of outmigrating juvenile salmon by exotic warmwater species inhabiting the pits. We present a simple spreadsheet model to show how different assumptions about gravel pit bathymetry and predator behavior would affect the cumulative benefits of multiple pit-filling and isolation projects, and how these insights could help managers prioritize which pits to fill.

  6. Multi-Element Integrated Project Planning at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Mullon, Robert

    2008-01-01

    This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

  7. Is this what you need? Direct feedback help climate change information exchange

    NASA Astrophysics Data System (ADS)

    Bachelet, D. M.; Brown, M.; Gough, M.; Basin, D.

    2015-12-01

    The combination of projected climate change and land use adds uncertainty to the long-term effectiveness of current management strategies. Managers need reliable information to adjust their strategies as population density increases. However they are currently overwhelmed by the diversity of available information and the multiplicity of sources. CBI's goal is to centralize and package effectively the usable information for land managers and for the general public in order to increase awareness and promote preparation for the challenges ahead. We are designing conservation planning atlases in Data Basin for a number of landscape conservation cooperatives to address this need. We are adding some user-friendly tools to specifically serve the available climate projections and land use data in a meaningful way. By working closely with a group of managers, our goal is to understand how consideration of these projections figures into the decision-making process and refine the ways we can deliver relevant metrics. We have been holding interviews to gather information and critical feedback on existing climate-related web pages and tools, providing us with benchmarks for improvement. As it turned out, the student-manager dialogue added a component of climate change education and awareness of available tools to the project. Through an iterative process we plan to continue this exchange and address the variety of issues managers continually have to face to maintain healthy ecosystems.

  8. Integrating management tools and concepts to develop an estuarine planning support system: A case study of the Humber Estuary, Eastern England.

    PubMed

    Lonsdale, Jemma-Anne; Weston, Keith; Barnard, Steve; Boyes, Suzanne J; Elliott, Michael

    2015-11-15

    Estuaries are important because of their multiple uses and users which often makes them challenging to manage since management must strike a balance between the needs of users, the estuaries' ecological and economic value and the context of multiple legislative drivers. To facilitate management we have therefore developed an Estuarine Planning Support System (EPSS) framework using the Humber Estuary, Eastern England, as a case study which integrates the current legislation tools and concepts. This integrated EPSS framework is an improvement on previous approaches for assessing cumulative impacts as it takes into account legislative drivers, management tools and other mechanisms for controlling plans/projects specific to the estuary. It therefore enables managers and users to assess and address both the current state and the way in which a new industrial, port or urban development could impact an estuary in an accessible and understandable framework. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  9. Development and Appraisal of Multiple Accounting Record System (Mars).

    PubMed

    Yu, H C; Chen, M C

    2016-01-01

    The aim of the system is to achieve simplification of workflow, reduction of recording time, and increase the income for the study hospital. The project team decided to develop a multiple accounting record system that generates the account records based on the nursing records automatically, reduces the time and effort for nurses to review the procedure and provide another note of material consumption. Three configuration files were identified to demonstrate the relationship of treatments and reimbursement items. The workflow was simplified. The nurses averagely reduced 10 minutes of daily recording time, and the reimbursement points have been increased by 7.49%. The project streamlined the workflow and provides the institute a better way in finical management.

  10. JCL Implementation On A Human Spaceflight Program

    NASA Technical Reports Server (NTRS)

    Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William

    2013-01-01

    Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.

  11. Ames Engineering Directorate

    NASA Technical Reports Server (NTRS)

    Phillips, Veronica J.

    2017-01-01

    The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.

  12. Molecular Cloning Designer Simulator (MCDS): All-in-one molecular cloning and genetic engineering design, simulation and management software for complex synthetic biology and metabolic engineering projects.

    PubMed

    Shi, Zhenyu; Vickers, Claudia E

    2016-12-01

    Molecular Cloning Designer Simulator (MCDS) is a powerful new all-in-one cloning and genetic engineering design, simulation and management software platform developed for complex synthetic biology and metabolic engineering projects. In addition to standard functions, it has a number of features that are either unique, or are not found in combination in any one software package: (1) it has a novel interactive flow-chart user interface for complex multi-step processes, allowing an integrated overview of the whole project; (2) it can perform a user-defined workflow of cloning steps in a single execution of the software; (3) it can handle multiple types of genetic recombineering, a technique that is rapidly replacing classical cloning for many applications; (4) it includes experimental information to conveniently guide wet lab work; and (5) it can store results and comments to allow the tracking and management of the whole project in one platform. MCDS is freely available from https://mcds.codeplex.com.

  13. Comparing approaches for using climate projections in assessing water resources investments for systems with multiple stakeholder groups

    NASA Astrophysics Data System (ADS)

    Hurford, Anthony; Harou, Julien

    2015-04-01

    Climate change has challenged conventional methods of planning water resources infrastructure investment, relying on stationarity of time-series data. It is not clear how to best use projections of future climatic conditions. Many-objective simulation-optimisation and trade-off analysis using evolutionary algorithms has been proposed as an approach to addressing complex planning problems with multiple conflicting objectives. The search for promising assets and policies can be carried out across a range of climate projections, to identify the configurations of infrastructure investment shown by model simulation to be robust under diverse future conditions. Climate projections can be used in different ways within a simulation model to represent the range of possible future conditions and understand how optimal investments vary according to the different hydrological conditions. We compare two approaches, optimising over an ensemble of different 20-year flow and PET timeseries projections, and separately for individual future scenarios built synthetically from the original ensemble. Comparing trade-off curves and surfaces generated by the two approaches helps understand the limits and benefits of optimising under different sets of conditions. The comparison is made for the Tana Basin in Kenya, where climate change combined with multiple conflicting objectives of water management and infrastructure investment mean decision-making is particularly challenging.

  14. The Dust Management Project: Characterizing Lunar Environments and Dust, Developing Regolith Mitigation Technology and Simulants

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon A.

    2010-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth?s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting long-term operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it?s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, plans, and accomplishments will be presented.

  15. Assess and Adapt: Coordinated Ecoregional Forest Vulnerability Assessments Covering the Upper Midwest and Northeast in Support of Climate-informed Decision-making

    NASA Astrophysics Data System (ADS)

    Swanston, C.; Janowiak, M.; Handler, S.; Butler, P.; Brandt, L.; Iverson, L.; Thompson, F.; Ontl, T.; Shannon, D.

    2016-12-01

    Forest ecosystem vulnerability assessments are rapidly becoming an integral component of forest management planning, in which there is increasing public expectation that even near-term activities explicitly incorporate information about anticipated climate impacts and risks. There is a clear desire among forest managers for targeted assessments that address critical questions about species and ecosystem vulnerabilities while delivering this information in an accessible format. We developed the Ecosystem Vulnerability Assessment Approach (EVAA), which combines multiple quantitative models, expert elicitation from scientists and land managers, and a templated report structure oriented to natural resource managers. The report structure includes relevant information on the contemporary landscape, past climate, future climate projections, impact model results, and a transparent vulnerability assessment of species and ecosystems. We have used EVAA in seven ecoregional assessments covering 246 million acres of forestland across the upper Midwest and Northeast (www.forestadaptation.org; five published, two in review). We convened a panel of local forest ecology and management experts in each assessment area to examine projected climate effects on system drivers, stressors, and dominant species, as well as the current adaptive capacity of the major ecoregional forest ecosystems. The panels provided a qualitative assessment of the vulnerability of forest ecosystems to climate change over the next century. Over 130 authors from dozens of organizations collaborated on these peer-reviewed assessment publications, which are delivered to thousands of stakeholders through live and recorded webinars, online briefs, and in-person trainings and seminars. The assessments are designed to be used with the Adaptation Workbook (www.adaptationworkbook.org), a planning tool that works at multiple scales and has generated more than 200 real-world forest adaptation demonstration projects.

  16. Managed pollinator CAP Coordinated Agricultural Project

    USDA-ARS?s Scientific Manuscript database

    Scientists are looking at the root cause of the Colony Collapse Disorder (CCD) syndrome; searching for new diseases, harmful chemicals or a combination of these factors which could inflict stress on bee colonies pushing them over the edge for recovery. Among multiple suspects identified so far, bee...

  17. Integrating Human Factors into Space Vehicle Processing for Risk Management

    NASA Technical Reports Server (NTRS)

    Woodbury, Sarah; Richards, Kimberly J.

    2008-01-01

    This presentation will discuss the multiple projects performed in United Space Alliance's Human Engineering Modeling and Performance (HEMAP) Lab, improvements that resulted from analysis, and the future applications of the HEMAP Lab for risk assessment by evaluating human/machine interaction and ergonomic designs.

  18. A Word to the Wise: Advice for Scientists Engaged in Collaborative Adaptive Management

    NASA Astrophysics Data System (ADS)

    Hopkinson, Peter; Huber, Ann; Saah, David S.; Battles, John J.

    2017-05-01

    Collaborative adaptive management is a process for making decisions about the environment in the face of uncertainty and conflict. Scientists have a central role to play in these decisions. However, while scientists are well trained to reduce uncertainty by discovering new knowledge, most lack experience with the means to mitigate conflict in contested situations. To address this gap, we drew from our efforts coordinating a large collaborative adaptive management effort, the Sierra Nevada Adaptive Management Project, to offer advice to our fellow environmental scientists. Key challenges posed by collaborative adaptive management include the confusion caused by multiple institutional cultures, the need to provide information at management-relevant scales, frequent turnover in participants, fluctuations in enthusiasm among key constituencies, and diverse definitions of success among partners. Effective strategies included a dedication to consistency, a commitment to transparency, the willingness to communicate frequently via multiple forums, and the capacity for flexibility. Collaborative adaptive management represents a promising, new model for scientific engagement with the public. Learning the lessons of effective collaboration in environmental management is an essential task to achieve the shared goal of a sustainable future.

  19. The peculiarities of process-based approach realization in transport sector company management

    NASA Astrophysics Data System (ADS)

    Khripko, Elena; Sidorov, Gennadiy

    2017-10-01

    In the present article we study the phenomena of multiple meaning in understanding process-based management method in construction of transport infrastructure facilities. The idea of multiple meaning is in distortions which appear during reception of the management process paradigm in organizational environment of transport sector. The cause of distortion in process management is organizational resistance. The distortions of management processes are discovered at the level of diffusion among spheres of responsibility, collision in forms of functional, project and process interaction between the owner of the process and its participants. The level of distortion is affected by the attitude towards the result of work which means that process understanding of the result is replaced by the functional one in practice of management. This transfiguration is the consequence of regressive defensive mechanisms of the organizational environment. On the base of experience of forming process management in construction of transport infrastructure facilities company of the issues of diagnostics of various forms of organizational resistance and ways of reducing the destructive influence on managing processes are reviewed.

  20. Cooperative Learning through Team-Based Projects in the Biotechnology Industry †

    PubMed Central

    Luginbuhl, Sarah C.; Hamilton, Paul T.

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students’ professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting. PMID:24358386

  1. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    PubMed

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  2. Managing Headship Transitions in U.S. Independent Schools

    ERIC Educational Resources Information Center

    Kane, Pearl Rock; Barbaro, Justin

    2016-01-01

    Headship transitions in U.S. independent schools represent critical organizational events that affect multiple school constituencies, including faculty, staff, and students. With recent projections forecasting a high level of impending headship transitions in independent schools, this paper seeks to capture how second-year U.S. independent school…

  3. Merging Methods to Manage Uncertainty: Combining Simulation Modeling and Scenario Planning to Inform Resource Management Under Climate Change

    NASA Astrophysics Data System (ADS)

    Miller, B. W.; Schuurman, G. W.; Symstad, A.; Fisichelli, N. A.; Frid, L.

    2017-12-01

    Managing natural resources in this era of anthropogenic climate change is fraught with uncertainties around how ecosystems will respond to management actions and a changing climate. Scenario planning (oftentimes implemented as a qualitative, participatory exercise for exploring multiple possible futures) is a valuable tool for addressing this challenge. However, this approach may face limits in resolving responses of complex systems to altered climate and management conditions, and may not provide the scientific credibility that managers often require to support actions that depart from current practice. Quantitative information on projected climate changes and ecological responses is rapidly growing and evolving, but this information is often not at a scale or in a form that is `actionable' for resource managers. We describe a project that sought to create usable information for resource managers in the northern Great Plains by combining qualitative and quantitative methods. In particular, researchers, resource managers, and climate adaptation specialists co-produced a simulation model in conjunction with scenario planning workshops to inform natural resource management in southwest South Dakota. Scenario planning for a wide range of resources facilitated open-minded thinking about a set of divergent and challenging, yet relevant and plausible, climate scenarios and management alternatives that could be implemented in the simulation. With stakeholder input throughout the process, we built a simulation of key vegetation types, grazing, exotic plants, fire, and the effects of climate and management on rangeland productivity and composition. By simulating multiple land management jurisdictions, climate scenarios, and management alternatives, the model highlighted important tradeoffs between herd sizes and vegetation composition, and between the short- versus long-term costs of invasive species management. It also identified impactful uncertainties related to the effects of fire and grazing on vegetation. Ultimately, this integrative and iterative approach yielded counter-intuitive and surprising findings, and resulted in a more tractable set of possible futures for resource management planning.

  4. NIMH Prototype Management Information System for Community Mental Health Centers

    PubMed Central

    Wurster, Cecil R.; Goodman, John D.

    1980-01-01

    Various approaches to centralized support of computer applications in health care are described. The NIMH project to develop a prototype Management Information System (MIS) for community mental health centers is presented and discussed as a centralized development of an automated data processing system for multiple user organizations. The NIMH program is summarized, the prototype MIS is characterized, and steps taken to provide for the differing needs of the mental health centers are highlighted.

  5. A Recipe for Streamlining Mission Management

    NASA Technical Reports Server (NTRS)

    Mitchell, Andrew E.; Semancik, Susan K.

    2004-01-01

    This paper describes a project's design and implementation for streamlining mission management with knowledge capture processes across multiple organizations of a NASA directorate. Thc project's focus is on standardizing processes and reports; enabling secure information access and case of maintenance; automating and tracking appropriate workflow rules through process mapping; and infusing new technologies. This paper will describe a small team's experiences using XML technologies through an enhanced vendor suite of applications integrated on Windows-based platforms called the Wallops Integrated Scheduling and Document Management System (WISDMS). This paper describes our results using this system in a variety of endeavors, including providing range project scheduling and resource management for a Range and Mission Management Office; implementing an automated Customer Feedback system for a directorate; streamlining mission status reporting across a directorate; and initiating a document management, configuration management and portal access system for a Range Safety Office's programs. The end result is a reduction of the knowledge gap through better integration and distribution of information, improved process performance, automated metric gathering, and quicker identification of problem areas and issues. However, the real proof of the pudding comes through overcoming the user's reluctance to replace familiar, seasoned processes with new technology ingredients blended with automated procedures in an untested recipe. This paper shares some of the team's observations that led to better implementation techniques, as well as an IS0 9001 Best Practices citation. This project has provided a unique opportunity to advance NASA's competency in new technologies, as well as to strategically implement them within an organizational structure, while wetting the appetite for continued improvements in mission management.

  6. What happens when capitated behavioral health comes to town? The transition from the Fort Bragg demonstration to a capitated managed behavioral health contract.

    PubMed

    Heflinger, C A; Northrup, D A

    2000-11-01

    Capitated managed care contracts for behavioral health services are becoming more prevalent across the country in both public and private sectors. This study followed the transition from a demonstration project for child mental health services to a capitated managed behavioral health care contract with a for-profit managed care company. The focus of the study was on the impact--at both the service system and the individual consumer level--pertaining to the start-up and maintenance of a capitated managed behavioral health program. A case study using multiple methods and multiple sources of information incorporated a program fidelity framework that examined micro to macro levels of program implementation. The findings of this study include the following: access to services decreased, the lengths of stay and average daily census in the more intensive levels of treatment declined, difficult-to-treat children were shifted to the public sector, and ratings of service system performance and coordination fell.

  7. U.S. Forest Service Leads Climate Change Adaptation in the Western United States

    NASA Astrophysics Data System (ADS)

    Halofsky, J.; Peterson, D. L.

    2014-12-01

    Effective climate change engagement on public lands is characterized by (1) an enduring science-management partnership, (2) involvement of key stakeholders, (3) consideration of broad landscapes with multiple landowners, (4) science-based, peer-reviewed assessments of sensitivity of natural resources to climate change, (5) adaptation strategies and tactics developed by resource managers, (6) leadership and a workforce motivated to implement climate-smart practices in resource planning and project management. Using this approach, the U.S. Forest Service, in partnership with other organizations, has developed climate change vulnerability assessments and adaptation plans for diverse ecosystems and multiple resources in national forests and other lands in the western United States, although implementation (step 6) has been slow in some cases. Hundreds of meetings, strategies, plans, and panels have focused on climate change adaptation over the past decade, but only direct engagement between scientists and resource managers (less research, less planning, more action) has resulted in substantive outcomes and increased organizational capacity for climate-smart management.

  8. Effort to Accelerate MBSE Adoption and Usage at JSC

    NASA Technical Reports Server (NTRS)

    Wang, Lui; Izygon, Michel; Okron, Shira; Garner, Larry; Wagner, Howard

    2016-01-01

    This paper describes the authors' experience in adopting Model Based System Engineering (MBSE) at the NASA/Johnson Space Center (JSC). Since 2009, NASA/JSC has been applying MBSE using the Systems Modeling Language (SysML) to a number of advanced projects. Models integrate views of the system from multiple perspectives, capturing the system design information for multiple stakeholders. This method has allowed engineers to better control changes, improve traceability from requirements to design and manage the numerous interactions between components. As the project progresses, the models become the official source of information and used by multiple stakeholders. Three major types of challenges that hamper the adoption of the MBSE technology are described. These challenges are addressed by a multipronged approach that includes educating the main stakeholders, implementing an organizational infrastructure that supports the adoption effort, defining a set of modeling guidelines to help engineers in their modeling effort, providing a toolset that support the generation of valuable products, and providing a library of reusable models. JSC project case studies are presented to illustrate how the proposed approach has been successfully applied.

  9. Managed pollinator CAP coordinated agricultural project: detecting Nosema in time

    USDA-ARS?s Scientific Manuscript database

    Scientists are looking at the root cause of the Colony Collapse Disorder (CCD) syndrome by searching for new diseases, harmful chemicals or a combination of these factors which could inflict stress on bee colonies pushing them over the edge for recovery. Among multiple suspects identified so far, be...

  10. Habitat modeling for biodiversity conservation.

    Treesearch

    Bruce G. Marcot

    2006-01-01

    Habitat models address only 1 component of biodiversity but can be useful in addressing and managing single or multiple species and ecosystem functions, for projecting disturbance regimes, and in supporting decisions. I review categories and examples of habitat models, their utility for biodiversity conservation, and their roles in making conservation decisions. I...

  11. Managing intellectual property to develop medicines for the world's poorest.

    PubMed

    Fonteilles-Drabek, Sylvie; Reddy, David; Wells, Timothy N C

    2017-04-01

    It has been argued that patents impede the development and access of medicines for tropical diseases such as malaria. However, we believe that intellectual property can be a key tool to enable timely progression of drug development projects involving multiple partners and to ensure equitable access to successful products.

  12. Runoff and sediment reduction from integration of native prairie filter strips into row-crop agriculture

    USDA-ARS?s Scientific Manuscript database

    Agroecosystems provide multiple benefits including food, fiber, fuel, clean water and air, habitat, carbon sequestration, recreation, and aesthetics. But most agricultural landscapes are managed for only a few of these benefits. This project aimed to evaluate how the integration of diverse perennial...

  13. Sediment Profile Imagery as a Toll to Assist Benthic Assessment and Benthic Habitat Mapping

    EPA Science Inventory

    The U.S. EPA Atlantic Ecology Division and the Southern California Coastal Water Research Project (SCCWRP) collaborated in 2008 to explore the use of sediment profile imagery as a tool to assist environmental management, capturing multiple images at each of over 100 stations at a...

  14. Wikis and Collaborative Inquiry

    ERIC Educational Resources Information Center

    Lamb, Annette; Johnson, Larry

    2009-01-01

    Wikis are simply Web sites that provide easy-to-use tools for creating, editing, and sharing digital documents, images, and media files. Multiple participants can enter, submit, manage, and update a single Web workspace creating a community of authors and editors. Wiki projects help young people shift from being "consumers" of the Internet to…

  15. Real-time operating system for selected Intel processors

    NASA Technical Reports Server (NTRS)

    Pool, W. R.

    1980-01-01

    The rationale for system development is given along with reasons for not using vendor supplied operating systems. Although many system design and performance goals were dictated by problems with vendor supplied systems, other goals surfaced as a result of a design for a custom system able to span multiple projects. System development and management problems and areas that required redesign or major code changes for system implementation are examined as well as the relative successes of the initial projects. A generic description of the actual project is provided and the ongoing support requirements and future plans are discussed.

  16. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  17. Scientific Guidance for Rehabilitation of the Chesapeake Bay Ecosystem under the Changing Climate.

    NASA Astrophysics Data System (ADS)

    Boesch, D. F.; Johnson, Z. P.; Li, M.

    2017-12-01

    While the Chesapeake Bay is an estuary and not a marginal sea on the scale of the Baltic Sea or the Gulf of Mexico, it has a complex set of environmental issues and multiple political jurisdictions such that it can serve as a test bed for science-informed management in larger marine systems. In particular, the Chesapeake Bay possesses a relatively advanced effort to ameliorate eutrophication, reduce toxic stresses, rehabilitate critical habitats, and sustainably utilized resources. Furthermore, both scientists and managers are addressing these challenges while now beginning to incorporate the effects of changes in temperature, precipitation and runoff, sea level, ocean boundary conditions, and pH. Increases in temperature and sea level are already apparent and future conditions can be estimated from global model projections, although sea level and ocean exchanges are also affected by variations in Gulf Stream flows and mesoscale climate. Changes in the volume, seasonality and variability in freshwater delivery from the multiple rivers discharging to the bay are harder to project with confidence, but may have pervasive consequences for circulation, reducing nutrient loads to ameliorate eutrophication, biogeochemical processes, and biotic distributions and dynamics. Science is now challenged to inform multiple adaptation strategies, including minimizing the vulnerability of humans and infrastructure, sustaining important tidal wetlands, managing sediment resources, sustaining living resources, redefining achievable ecosystem rehabilitation goals, and achieving shifting goals for nutrient load reductions. At the same time, science will also have to identify effective means to meet these challenges while also reducing greenhouse gas emissions.

  18. Lessons Learned on Effective Co-production of Drought Science and Decision Support Tools with the Wind River Reservation Tribal Water Managers

    NASA Astrophysics Data System (ADS)

    McNeeley, S.; Ojima, D. S.; Beeton, T.

    2015-12-01

    The Wind River Reservation in west-central Wyoming is home of the Eastern Shoshone and Northern Arapaho Tribes. The reservation has experienced severe drought impacts on Tribal livelihoods and cultural activities in recent years. Scientists from the North Central Climate Science Center, the National Drought Mitigation Center, the High Plains Regional Climate Center, and multiple others are working in close partnership with the tribal water managers on a reservation-wide drought preparedness project that includes a technical assessment of drought risk, capacity building to train managers on drought and climate science and indicators, and drought planning. This talk will present project activities to date along with the valuable and transferrable lessons learned on effective co-production of actionable science for decision making in a tribal context.

  19. Phase 1 studies summary of major findings of the South Bay Salt Pond Restoration Project, South San Francisco Bay, California

    USGS Publications Warehouse

    Valoppi, Laura

    2018-04-02

    Executive SummaryThe South Bay Salt Pond Restoration Project (Project) is one of the largest restoration efforts in the United States. It is located in South San Francisco Bay of California. It is unique not only for its size—more than 15,000 acres—but also for its location adjacent to one of the nation’s largest urban areas, home to more than 4 million people (Alameda, Santa Clara, and San Mateo Counties). The Project is intended to restore and enhance wetlands in South San Francisco Bay while providing for flood management, wildlife-oriented public access, and recreation. Restoration goals of the project are to provide a mosaic of saltmarsh habitat to benefit marsh species and managed ponds to benefit waterbirds, throughout 3 complexes and 54 former salt ponds.Although much is known about the project area, significant uncertainties remain with a project of this geographic and temporal scale of an estimated 50 years to complete the restoration. For example, in order to convert anywhere from 50 to 90 percent of the existing managed ponds to saltmarsh habitat, conservation managers first enhance the habitat of managed ponds in order to increase use by waterbirds, and provide migratory, wintering, and nesting habitat for more than 90 species of waterbirds. Project managers have concluded that the best way to address these uncertainties is to carefully implement the project in phases and learn from the outcome of each phase. The Adaptive Management Plan (AMP) identifies specific restoration targets for multiple aspects of the Project and defines triggers that would necessitate some type of management action if a particular aspect is trending negatively. U.S. Geological Survey (USGS) biologist Laura Valoppi served as the project Lead Scientist and oversaw implementation of the AMP in coordination with other members of the Project Management Team (PMT), comprised of representatives from the California State Coastal Conservancy, California Department of Fish and Wildlife, the Santa Clara Valley Water District, the U.S. Army Corps of Engineers, and the U.S. Fish and Wildlife Service.To implement the AMP, the PMT have selected and funded applied studies and monitoring projects to address key uncertainties. This information is used by the PMT to make decisions about current management of the project area and future restoration actions in order to meet project.This document summarizes the major scientific findings from studies conducted from 2009 to 2016, as part of the science program that was conducted in conjunction with Phase 1 restoration and management actions. Additionally, this report summarizes the management response to the study results under the guidance of the AMP framework and provides a list of suggested studies to be conducted in “Phase 2–A scorecard summarizing the Project’s progress toward meeting the AMP goals for a range of Project objectives.” The scoring to date indicates that the Project is meeting or exceeding expectations for sediment accretion and western snowy plover (Charadrius alexandrinus nivosus) recovery. There is uncertainty with respect to objectives for California gulls (Larus californicus), California least tern (Sternula antillarum), steelhead trout (Oncorhynchus mykiss), and regulatory water quality objectives. Water quality and algal blooms, specifically of the managed ponds, is indicated as trending negative. However, the vast majority of objectives are trending positive, including increased abundance for a number of bird guilds, increasing marsh habitat, maintenance of mudflats, visitor experience, estuarine fish numbers, and special-status marsh species numbers.

  20. Systems engineering implementation in the preliminary design phase of the Giant Magellan Telescope

    NASA Astrophysics Data System (ADS)

    Maiten, J.; Johns, M.; Trancho, G.; Sawyer, D.; Mady, P.

    2012-09-01

    Like many telescope projects today, the 24.5-meter Giant Magellan Telescope (GMT) is truly a complex system. The primary and secondary mirrors of the GMT are segmented and actuated to support two operating modes: natural seeing and adaptive optics. GMT is a general-purpose telescope supporting multiple science instruments operated in those modes. GMT is a large, diverse collaboration and development includes geographically distributed teams. The need to implement good systems engineering processes for managing the development of systems like GMT becomes imperative. The management of the requirements flow down from the science requirements to the component level requirements is an inherently difficult task in itself. The interfaces must also be negotiated so that the interactions between subsystems and assemblies are well defined and controlled. This paper will provide an overview of the systems engineering processes and tools implemented for the GMT project during the preliminary design phase. This will include requirements management, documentation and configuration control, interface development and technical risk management. Because of the complexity of the GMT system and the distributed team, using web-accessible tools for collaboration is vital. To accomplish this GMTO has selected three tools: Cognition Cockpit, Xerox Docushare, and Solidworks Enterprise Product Data Management (EPDM). Key to this is the use of Cockpit for managing and documenting the product tree, architecture, error budget, requirements, interfaces, and risks. Additionally, drawing management is accomplished using an EPDM vault. Docushare, a documentation and configuration management tool is used to manage workflow of documents and drawings for the GMT project. These tools electronically facilitate collaboration in real time, enabling the GMT team to track, trace and report on key project metrics and design parameters.

  1. Fire management, managed relocation, and land conservation options for long-lived obligate seeding plants under global changes in climate, urbanization, and fire regime.

    PubMed

    Bonebrake, Timothy C; Syphard, Alexandra D; Franklin, Janet; Anderson, Kurt E; Akçakaya, H Resit; Mizerek, Toni; Winchell, Clark; Regan, Helen M

    2014-08-01

    Most species face multiple anthropogenic disruptions. Few studies have quantified the cumulative influence of multiple threats on species of conservation concern, and far fewer have quantified the potential relative value of multiple conservation interventions in light of these threats. We linked spatial distribution and population viability models to explore conservation interventions under projected climate change, urbanization, and changes in fire regime on a long-lived obligate seeding plant species sensitive to high fire frequencies, a dominant plant functional type in many fire-prone ecosystems, including the biodiversity hotspots of Mediterranean-type ecosystems. First, we investigated the relative risk of population decline for plant populations in landscapes with and without land protection under an existing habitat conservation plan. Second, we modeled the effectiveness of relocating both seedlings and seeds from a large patch with predicted declines in habitat area to 2 unoccupied recipient patches with increasing habitat area under 2 projected climate change scenarios. Finally, we modeled 8 fire return intervals (FRIs) approximating the outcomes of different management strategies that effectively control fire frequency. Invariably, long-lived obligate seeding populations remained viable only when FRIs were maintained at or above a minimum level. Land conservation and seedling relocation efforts lessened the impact of climate change and land-use change on obligate seeding populations to differing degrees depending on the climate change scenario, but neither of these efforts was as generally effective as frequent translocation of seeds. While none of the modeled strategies fully compensated for the effects of land-use and climate change, an integrative approach managing multiple threats may diminish population declines for species in complex landscapes. Conservation plans designed to mitigate the impacts of a single threat are likely to fail if additional threats are ignored. © 2014 Society for Conservation Biology.

  2. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    PubMed

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  3. LSN MS guidelines for the management of multiple sclerosis.

    PubMed

    Shatila, A R; Koussa, S; Jabbour, R; Mourad, A; Aouad, A; Sabbagh, G; Kallab, K; Hilal, R; Khalifeh, R; Gebeily, S; Tourbah, A

    2013-12-01

    The prevalence of multiple sclerosis (MS) in Lebanon is unknown, as there are no available or reliable epidemiological studies to date. The circumstances of Middle East countries are different from those of Europe and North America in terms of differential diagnoses and disease management. The aim of the conference is to establish guidelines for diagnosis, treatment, follow-up and management of patients with MS in Lebanon. Another objective is to discuss and participate in research projects based on epidemiology, clinical trials and more fundamental aspects of the disease in the future. Under the authority of the Lebanese Society of Neurology (LSN), a group of neurologists took the initiative to participate in this LSN MS committee with the purpose of establishing a consensus for the management of patients with MS, and under the supervision of a Coordinator (A.T.) designed by the LSN board. Diagnostic and therapeutic, follow-up and research recommendations were proposed with special emphasis on the specific needs and circumstances of Lebanon. The experts highlighted the importance of considering particular needs, the identification of patients at high risk of developing MS in order to maximize therapeutic opportunities, and cost-effective control of treatment efficacy, as well as global assessment of disability. The experts established guidelines concerning diagnosis, treatment, and follow-up of patients with MS in Lebanon. Furthermore, they recommended some clinical and fundamental research projects. Copyright © 2013 Elsevier Masson SAS. All rights reserved.

  4. Software Transition Project Retrospectives and the Application of SEL Effort Estimation Model and Boehm's COCOMO to Complex Software Transition Projects

    NASA Technical Reports Server (NTRS)

    McNeill, Justin

    1995-01-01

    The Multimission Image Processing Subsystem (MIPS) at the Jet Propulsion Laboratory (JPL) has managed transitions of application software sets from one operating system and hardware platform to multiple operating systems and hardware platforms. As a part of these transitions, cost estimates were generated from the personal experience of in-house developers and managers to calculate the total effort required for such projects. Productivity measures have been collected for two such transitions, one very large and the other relatively small in terms of source lines of code. These estimates used a cost estimation model similar to the Software Engineering Laboratory (SEL) Effort Estimation Model. Experience in transitioning software within JPL MIPS have uncovered a high incidence of interface complexity. Interfaces, both internal and external to individual software applications, have contributed to software transition project complexity, and thus to scheduling difficulties and larger than anticipated design work on software to be ported.

  5. Integrating science into management of ecosystems in the Greater Blue Mountains.

    PubMed

    Chapple, Rosalie S; Ramp, Daniel; Bradstock, Ross A; Kingsford, Richard T; Merson, John A; Auld, Tony D; Fleming, Peter J S; Mulley, Robert C

    2011-10-01

    Effective management of large protected conservation areas is challenged by political, institutional and environmental complexity and inconsistency. Knowledge generation and its uptake into management are crucial to address these challenges. We reflect on practice at the interface between science and management of the Greater Blue Mountains World Heritage Area (GBMWHA), which covers approximately 1 million hectares west of Sydney, Australia. Multiple government agencies and other stakeholders are involved in its management, and decision-making is confounded by numerous plans of management and competing values and goals, reflecting the different objectives and responsibilities of stakeholders. To highlight the complexities of the decision-making process for this large area, we draw on the outcomes of a recent collaborative research project and focus on fire regimes and wild-dog control as examples of how existing knowledge is integrated into management. The collaborative research project achieved the objectives of collating and synthesizing biological data for the region; however, transfer of the project's outcomes to management has proved problematic. Reasons attributed to this include lack of clearly defined management objectives to guide research directions and uptake, and scientific information not being made more understandable and accessible. A key role of a local bridging organisation (e.g., the Blue Mountains World Heritage Institute) in linking science and management is ensuring that research results with management significance can be effectively transmitted to agencies and that outcomes are explained for nonspecialists as well as more widely distributed. We conclude that improved links between science, policy, and management within an adaptive learning-by-doing framework for the GBMWHA would assist the usefulness and uptake of future research.

  6. Integrating Science into Management of Ecosystems in the Greater Blue Mountains

    NASA Astrophysics Data System (ADS)

    Chapple, Rosalie S.; Ramp, Daniel; Bradstock, Ross A.; Kingsford, Richard T.; Merson, John A.; Auld, Tony D.; Fleming, Peter J. S.; Mulley, Robert C.

    2011-10-01

    Effective management of large protected conservation areas is challenged by political, institutional and environmental complexity and inconsistency. Knowledge generation and its uptake into management are crucial to address these challenges. We reflect on practice at the interface between science and management of the Greater Blue Mountains World Heritage Area (GBMWHA), which covers approximately 1 million hectares west of Sydney, Australia. Multiple government agencies and other stakeholders are involved in its management, and decision-making is confounded by numerous plans of management and competing values and goals, reflecting the different objectives and responsibilities of stakeholders. To highlight the complexities of the decision-making process for this large area, we draw on the outcomes of a recent collaborative research project and focus on fire regimes and wild-dog control as examples of how existing knowledge is integrated into management. The collaborative research project achieved the objectives of collating and synthesizing biological data for the region; however, transfer of the project's outcomes to management has proved problematic. Reasons attributed to this include lack of clearly defined management objectives to guide research directions and uptake, and scientific information not being made more understandable and accessible. A key role of a local bridging organisation (e.g., the Blue Mountains World Heritage Institute) in linking science and management is ensuring that research results with management significance can be effectively transmitted to agencies and that outcomes are explained for nonspecialists as well as more widely distributed. We conclude that improved links between science, policy, and management within an adaptive learning-by-doing framework for the GBMWHA would assist the usefulness and uptake of future research.

  7. Managing data from multiple disciplines, scales, and sites to support synthesis and modeling

    USGS Publications Warehouse

    Olson, R. J.; Briggs, J. M.; Porter, J.H.; Mah, Grant R.; Stafford, S.G.

    1999-01-01

    The synthesis and modeling of ecological processes at multiple spatial and temporal scales involves bringing together and sharing data from numerous sources. This article describes a data and information system model that facilitates assembling, managing, and sharing diverse data from multiple disciplines, scales, and sites to support integrated ecological studies. Cross-site scientific-domain working groups coordinate the development of data associated with their particular scientific working group, including decisions about data requirements, data to be compiled, data formats, derived data products, and schedules across the sites. The Web-based data and information system consists of nodes for each working group plus a central node that provides data access, project information, data query, and other functionality. The approach incorporates scientists and computer experts in the working groups and provides incentives for individuals to submit documented data to the data and information system.

  8. Research impact of systems-level long-term care research: a multiple case study.

    PubMed

    Kothari, Anita; Peter, Nedra; Donskov, Melissa; Luciani, Tracy

    2017-03-21

    Traditional reporting of research outcomes and impacts, which tends to focus on research product publications and grant success, does not capture the value, some contributions, or the complexity of research projects. The purpose of this study was to understand the contributions of five systems-level research projects as they were unfolding at the Bruyère Centre for Learning, Research and Innovation (CLRI) in long-term care (LTC) in Ottawa, Ontario, Canada. The research questions were, (1) How are partnerships with research end-users (policymakers, administrators and other public/private organisations) characterised? (2) How have interactions with the CLRI Management Committee and Steering Committee influenced the development of research products? (3) In what way have other activities, processes, unlinked actors or organisations been influenced by the research project activities? The study was guided by Kok and Schuit's concept of research impacts, using a multiple case study design. Data were collected through focus groups and interviews with research teams, a management and a steering committee, research user partners, and unlinked actors. Documents were collected and analysed for contextual background. Cross-case analysis revealed four major themes: (1) Benefits and Perceived Tensions: Working with Partners; (2) Speaking with the LTC Community: Interactions with the CLRI Steering Committee; (3) The Knowledge Broker: Interactions with the Management Committee; and (4) All Forms of Research Contributions. Most contributions were focused on interactions with networks and stimulating important conversations in the province about LTC issues. These contributions were well-supported by the Steering and Management Committees' research-to-action platform, which can be seen as a type of knowledge brokering model. It was also clear that researcher-user partnerships were beneficial and important.

  9. The Baselines Project: Establishing Reference Environmental Conditions for Marine Habitats in the Gulf of Mexico using Forecast Models and Satellite Data

    NASA Astrophysics Data System (ADS)

    Jolliff, J. K.; Gould, R. W.; deRada, S.; Teague, W. J.; Wijesekera, H. W.

    2012-12-01

    We provide an overview of the NASA-funded project, "High-Resolution Subsurface Physical and Optical Property Fields in the Gulf of Mexico: Establishing Baselines and Assessment Tools for Resource Managers." Data assimilative models, analysis fields, and multiple satellite data streams were used to construct temperature and photon flux climatologies for the Flower Garden Banks National Marine Sanctuary (FGBNMS) and similar habitats in the northwestern Gulf of Mexico where geologic features provide a platform for unique coral reef ecosystems. Comparison metrics of the products to in situ data collected during complimentary projects are also examined. Similarly, high-resolution satellite-data streams and advanced processing techniques were used to establish baseline suspended sediment load and turbidity conditions in selected northern Gulf of Mexico estuaries. The results demonstrate the feasibility of blending models and data into accessible web-based analysis products for resource managers, policy makers, and the public.

  10. Species distribution modelling for plant communities: Stacked single species or multivariate modelling approaches?

    Treesearch

    Emilie B. Henderson; Janet L. Ohmann; Matthew J. Gregory; Heather M. Roberts; Harold S.J. Zald

    2014-01-01

    Landscape management and conservation planning require maps of vegetation composition and structure over large regions. Species distribution models (SDMs) are often used for individual species, but projects mapping multiple species are rarer. We compare maps of plant community composition assembled by stacking results from many SDMs with multivariate maps constructed...

  11. Project risk and appeals in U.S. Forest Service planning

    Treesearch

    Marc J. Stern; S. Andrew Predmore; Wayde C. Morse; David N. Seesholtz

    2013-01-01

    The National Environmental Policy Act (NEPA) requires U.S. Forest Service planning processes to be conducted by interdisciplinary teams of resource specialists to analyze and disclose the likely environmental impacts of proposed natural resource management actions on Forest Service lands. Multiple challenges associated with these processes have been a source of...

  12. Integration of e-Management, e-Development and e-Learning Technologies for Blended Course Delivery

    ERIC Educational Resources Information Center

    Johnson, Lynn E.; Tang, Michael

    2005-01-01

    This paper describes and assesses a pre-engineering curriculum development project called Foundations of Engineering, Science and Technology (FEST). FEST integrates web-based technologies into an inter-connected system to enable delivery of a blended program at multiple institutions. Tools and systems described include 1) technologies to deliver…

  13. Use of Aerial Hyperspectral Imaging For Monitoring Forest Health

    Treesearch

    Milton O. Smith; Nolan J. Hess; Stephen Gulick; Lori G. Eckhardt; Roger D. Menard

    2004-01-01

    This project evaluates the effectiveness of aerial hyperspectral digital imagery in the assessment of forest health of loblolly stands in central Alabama. The imagery covers 50 square miles, in Bibb and Hale Counties, south of Tuscaloosa, AL, which includes intensive managed forest industry sites and National Forest lands with multiple use objectives. Loblolly stands...

  14. Pricing the Services of Scientific Cores. Part II: Charging Outside Users.

    ERIC Educational Resources Information Center

    Fife, Jerry; Forrester, Robert

    2002-01-01

    Explaining that scientific cores at research institutions support shared resources and facilities, considers pricing of services to users from outside the institution. Proposes a method of allocating charges from the cores to projects with multiple funding sources through program-based management. Describes aspects of an example program: price of…

  15. Real Clients, Real Management, Real Failure: The Risks and Rewards of Service Learning

    ERIC Educational Resources Information Center

    Cyphert, Dale

    2006-01-01

    There are multiple advantages to service-learning projects across the business curriculum, but in communication classes the author has found their biggest value to be authenticity. A "real-world" assignment requires the flexible, creative integration of communication skills in an environment where, "unlike exams and other typical university…

  16. Integrated remote sensing and visualization (IRSV) system for transportation infrastructure operations and management, phase two, volume 4 : web-based bridge information database--visualization analytics and distributed sensing.

    DOT National Transportation Integrated Search

    2012-03-01

    This report introduces the design and implementation of a Web-based bridge information visual analytics system. This : project integrates Internet, multiple databases, remote sensing, and other visualization technologies. The result : combines a GIS ...

  17. Managing high-risk patients: the Mass General care management programme

    PubMed Central

    Kodner, Dennis L.

    2015-01-01

    The Massachusetts General Care Management Program (Mass General CMP or CMP) was designed as a federally supported demonstration to test the impact of intensive, practice-based care management on high-cost Medicare fee-for-service (FFS) beneficiaries—primarily older persons—with multiple hospitalisations and multiple chronic conditions. The Massachusetts General Care Management Program operated over a 6-year period in two phases (3 years each). It started during the first phase at Massachusetts General Hospital, a major academic medical centre in Boston, Massachusetts in collaboration with Massachusetts General Physicians Organisation. During the second phase, the programme expanded to two more affiliated sites in and around the Boston area, including a community hospital, as well as incorporated several modifications primarily focused on the management of transitions to post-acute care in skilled nursing facilities. At the close of the demonstration in July 2012, Mass General Massachusetts General Care Management Program became a component of a new Pioneer accountable care organisation (ACO). The Massachusetts General Care Management Program is focused on individuals meeting defined eligibility criteria who are offered care that is integrated by a case manager embedded in a primary care practice. The demonstration project showed substantial cost savings compared to fee-for-service patients served in the traditional Medicare system but no impact on hospital readmissions. The Massachusetts General Care Management Program does not rest upon a “whole systems” approach to integrated care. It is an excellent example of how an innovative care co-ordination programme can be implemented in an existing health-care organisation without making fundamental changes in its underlying structure or the way in which direct patient care services are paid for. The accountable care organisation version of the Massachusetts General Care Management Program includes the staffing structure, standards of practice, collaborative approach to care transitions and information technology tools that were used in the original demonstration project. PMID:26417211

  18. Le management des projets scientifiques

    NASA Astrophysics Data System (ADS)

    Perrier, Françoise

    2000-12-01

    We describe in this paper a new approach for the management of scientific projects. This approach is the result of a long reflexion carried out within the MQDP (Methodology and Quality in the Project Development) group of INSU-CNRS, and continued with Guy Serra. Our reflexion was initiated with the study of the so-called `North-American Paradigm' which was, initially considered as the only relevant management model. Through our active participation in several astrophysical projects we realized that this model could not be applied to our laboratories without major modifications. Therefore, step-by-step, we have constructed our own methodology, using to the fullest human potential resources existing in our research field, their habits and skills. We have also participated in various working groups in industrial and scientific organisms for the benefits of CNRS. The management model presented here is based on a systemic and complex approach. This approach lets us describe the multiple aspects of a scientific project specially taking into account the human dimension. The project system model includes three major interconnected systems, immersed within an influencing and influenced environment: the `System to be Realized' which defines scientific and technical tasks leading to the scientific goals, the `Realizing System' which describes procedures, processes and organization, and the `Actors' System' which implements and boosts all the processes. Each one exists only through a series of successive models, elaborated at predefined dates of the project called `key-points'. These systems evolve with time and under often-unpredictable circumstances and the models have to take it into account. At these key-points, each model is compared to reality and the difference between the predicted and realized tasks is evaluated in order to define the data for the next model. This model can be applied to any kind of projects.

  19. Passport-PeopleSoft integration for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    The integration between the PeopleSoft applications and Passport modules are accomplished with an off the shelf package developed by lNDUS. The product was updated to the PeopleSoft Release 7.O. The Integration product interacts with data from multiple products within Passport and PeopleSoft. For 10/l/98 the Integration will interlace between the following: (1) PassPort Accounts Payable, Contract Management, Inventory Management, Purchasing; and (2) PeopleSoft General Ledger, Project Costing, Human Resources, Payroll. The current supply systems and financial systems interact with each other via multiple custom interfaces. Data integrity and Y2K issues were some of the driving factors in replacement of thesemore » systems. The new systems allow FDH the opportunity to change the current business processes to go to a best business practice that the commercial off the shelf software was adopted.« less

  20. Reviewing Bayesian Networks potentials for climate change impacts assessment and management: A multi-risk perspective.

    PubMed

    Sperotto, Anna; Molina, José-Luis; Torresan, Silvia; Critto, Andrea; Marcomini, Antonio

    2017-11-01

    The evaluation and management of climate change impacts on natural and human systems required the adoption of a multi-risk perspective in which the effect of multiple stressors, processes and interconnections are simultaneously modelled. Despite Bayesian Networks (BNs) are popular integrated modelling tools to deal with uncertain and complex domains, their application in the context of climate change still represent a limited explored field. The paper, drawing on the review of existing applications in the field of environmental management, discusses the potential and limitation of applying BNs to improve current climate change risk assessment procedures. Main potentials include the advantage to consider multiple stressors and endpoints in the same framework, their flexibility in dealing and communicate with the uncertainty of climate projections and the opportunity to perform scenario analysis. Some limitations (i.e. representation of temporal and spatial dynamics, quantitative validation), however, should be overcome to boost BNs use in climate change impacts assessment and management. Copyright © 2017 Elsevier Ltd. All rights reserved.

  1. Application of science-based restoration planning to a desert river system.

    PubMed

    Laub, Brian G; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  2. Application of Science-Based Restoration Planning to a Desert River System

    NASA Astrophysics Data System (ADS)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  3. Application of science-based restoration planning to a desert river system

    USGS Publications Warehouse

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  4. Implementing regional sediment management to sustain navigation at an energetic tidal inlet

    USGS Publications Warehouse

    Moritz, H.R.; Gelfenbaum, G.R.; Kaminsky, G.M.; Ruggiero, P.; Oltman-shay, J.; Mckillip, D.J.

    2007-01-01

    Regional Sediment Management (RSM) is a systems-based approach for managing multiple projects involving sediment. RSM fosters balance between infrastructure and natural system processes, resulting in reduced project costs and achievement of greater benefits. This paper introduces the RSM concept and describes how RSM is being implemented at the Mouth of the Columbia River to sustain the inlet's 100-year old navigation infrastructure and adjacent shore lands. Implementing RSM at this energetic inlet involves feeding the inlet's morphology using dredged material, and letting nature do the work of dispersing the placed dredged material to supplement the inlet's sediment budget, without compromising the reliability of the navigation channel. The paper discusses the types of data that are being collected and analyzed to understand the environmental forcing affecting the inlet's morphology. The paper also addresses how dredged material disposal is being conducted to implement RSM.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foslien, Wendy K.; Curtner, Keith L.

    Because of growing energy demands and shortages, residential home owners are turning to energy conservation measures and smart home energy management devices to help them reduce energy costs and live more sustainably. In this context, the Honeywell team researched, developed, and tested the Context Aware Smart Home Energy Manager (CASHEM) as a trusted advisor for home energy management. The project focused on connecting multiple devices in a home through a uniform user interface. The design of the user interface was an important feature of the project because it provided a single place for the homeowner to control all devices andmore » was also where they received coaching. CASHEM then used data collected from homes to identify the contexts that affect operation of home appliances. CASHEM's goal was to reduce energy consumption while keeping the user's key needs satisfied. Thus, CASHEM was intended to find the opportunities to minimize energy consumption in a way that fit the user's lifestyle.« less

  6. CAMBerVis: visualization software to support comparative analysis of multiple bacterial strains.

    PubMed

    Woźniak, Michał; Wong, Limsoon; Tiuryn, Jerzy

    2011-12-01

    A number of inconsistencies in genome annotations are documented among bacterial strains. Visualization of the differences may help biologists to make correct decisions in spurious cases. We have developed a visualization tool, CAMBerVis, to support comparative analysis of multiple bacterial strains. The software manages simultaneous visualization of multiple bacterial genomes, enabling visual analysis focused on genome structure annotations. The CAMBerVis software is freely available at the project website: http://bioputer.mimuw.edu.pl/camber. Input datasets for Mycobacterium tuberculosis and Staphylocacus aureus are integrated with the software as examples. m.wozniak@mimuw.edu.pl Supplementary data are available at Bioinformatics online.

  7. Operations management system advanced automation: Fault detection isolation and recovery prototyping

    NASA Technical Reports Server (NTRS)

    Hanson, Matt

    1990-01-01

    The purpose of this project is to address the global fault detection, isolation and recovery (FDIR) requirements for Operation's Management System (OMS) automation within the Space Station Freedom program. This shall be accomplished by developing a selected FDIR prototype for the Space Station Freedom distributed processing systems. The prototype shall be based on advanced automation methodologies in addition to traditional software methods to meet the requirements for automation. A secondary objective is to expand the scope of the prototyping to encompass multiple aspects of station-wide fault management (SWFM) as discussed in OMS requirements documentation.

  8. Implementation of a diabetes self-management education program in primary care for adults using shared medical appointments.

    PubMed

    Sanchez, Iris

    2011-01-01

    The purpose of this study was to implement diabetes self-management education in primary care using the Chronic Care Model and shared medical appointments (SMA) to provide evidence-based interventions to improve process and measure outcomes. A quality improvement project using the Plan-Do-Check-Act cycle was implemented in a primary care setting in South Texas to provide diabetes self-management education for adults. Biological measures were evaluated in 70 patients at initiation of the project and thereafter based on current practice guidelines. The results of the project were consistent with the literature regarding the benefits, sustainability, and viability of SMA. As compared with that in studies presented in the literature, the patient population who participated in SMA had similar outcomes regarding improvement in A1C, self-management skills, and satisfaction. SMA are an innovative system redesign concept with the potential to provide comprehensive and coordinated care for patients with multiple and chronic health conditions while still being an efficient, effective, financially viable, and sustainable program. As the incidence and prevalence of diabetes increase, innovative models of care can meet the growing demand for access and utilization of diabetes self-management education programs. Programs focusing on chronic conditions to improve outcomes can be replicated by health care providers in primary care settings. SMA can increase revenue and productivity, improve disease management, and increase provider and patient satisfaction.

  9. Marine species in ambient low-oxygen regions subject to double jeopardy impacts of climate change.

    PubMed

    Stortini, Christine H; Chabot, Denis; Shackell, Nancy L

    2017-06-01

    We have learned much about the impacts of warming on the productivity and distribution of marine organisms, but less about the impact of warming combined with other environmental stressors, including oxygen depletion. Also, the combined impact of multiple environmental stressors requires evaluation at the scales most relevant to resource managers. We use the Gulf of St. Lawrence, Canada, characterized by a large permanently hypoxic zone, as a case study. Species distribution models were used to predict the impact of multiple scenarios of warming and oxygen depletion on the local density of three commercially and ecologically important species. Substantial changes are projected within 20-40 years. A eurythermal depleted species already limited to shallow, oxygen-rich refuge habitat (Atlantic cod) may be relatively uninfluenced by oxygen depletion but increase in density within refuge areas with warming. A more stenothermal, deep-dwelling species (Greenland halibut) is projected to lose ~55% of its high-density areas under the combined impacts of warming and oxygen depletion. Another deep-dwelling, more eurythermal species (Northern shrimp) would lose ~4% of its high-density areas due to oxygen depletion alone, but these impacts may be buffered by warming, which may increase density by 8% in less hypoxic areas, but decrease density by ~20% in the warmest parts of the region. Due to local climate variability and extreme events, and that our models cannot project changes in species sensitivity to hypoxia with warming, our results should be considered conservative. We present an approach to effectively evaluate the individual and cumulative impacts of multiple environmental stressors on a species-by-species basis at the scales most relevant to managers. Our study may provide a basis for work in other low-oxygen regions and should contribute to a growing literature base in climate science, which will continue to be of support for resource managers as climate change accelerates. © 2016 John Wiley & Sons Ltd.

  10. Social and Personal Factors in Semantic Infusion Projects

    NASA Astrophysics Data System (ADS)

    West, P.; Fox, P. A.; McGuinness, D. L.

    2009-12-01

    As part of our semantic data framework activities across multiple, diverse disciplines we required the involvement of domain scientists, computer scientists, software engineers, data managers, and often, social scientists. This involvement from a cross-section of disciplines turns out to be a social exercise as much as it is a technical and methodical activity. Each member of the team is used to different modes of working, expectations, vocabularies, levels of participation, and incentive and reward systems. We will examine how both roles and personal responsibilities play in the development of semantic infusion projects, and how an iterative development cycle can contribute to the successful completion of such a project.

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  12. Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

    USGS Publications Warehouse

    Hnottavange-Telleen, K.; Chabora, E.; Finley, R.J.; Greenberg, S.E.; Marsteller, S.

    2011-01-01

    Like most large-scale infrastructure projects, carbon dioxide (CO 2) geological sequestration (GS) projects have multiple success criteria and multiple stakeholders. In this context "risk evaluation" encompasses multiple scales. Yet a risk management program aims to maximize the chance of project success by assessing, monitoring, minimizing all risks in a consistent framework. The 150,000-km2 Illinois Basin underlies much of the state of Illinois, USA, and parts of adjacent Kentucky and Indiana. Its potential for CO2 storage is first-rate among basins in North America, an impression that has been strengthened by early testing of the injection well of the Midwest Geological Sequestration Consortium's (MGSC's) Phase III large scale demonstration project, the Illinois Basin - Decatur Project (IBDP). The IBDP, funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL), represents a key trial of GS technologies and project-management techniques. Though risks are specific to each site and project, IBDP risk management methodologies provide valuable experience for future GS projects. IBDP views risk as the potential for negative impact to any of these five values: health and safety, environment, financial, advancing the viability and public acceptability of a GS industry, and research. Research goals include monitoring one million metric tonnes of injected CO2 in the subsurface. Risk management responds to the ways in which any values are at risk: for example, monitoring is designed to reduce uncertainties in parameter values that are important for research and system control, and is also designed to provide public assurance. Identified risks are the primary basis for risk-reduction measures: risks linked to uncertainty in geologic parameters guide further characterization work and guide simulations applied to performance evaluation. Formally, industry defines risk (more precisely risk criticality) as the product L*S, the Likelihood multiplied by the Severity of negative impact. L and S are each evaluated on five-point scales, yielding a theoretical spread in risk values of 1 through 25. So defined, these judgment-based values are categorical and ordinal - they do not represent physically measurable quantities, but are nonetheless useful for comparison and therefore decision support. The "risk entities" first evaluated are FEPs - conceptual Features, Events, and Processes based on the list published by Quintessa Ltd. After concrete scenarios are generated based on selected FEPs, scenarios become the critical entities whose associated risks are evaluated and tracked. In IBDP workshops, L and S values for 123 FEPs were generated through expert elicitation. About 30 experts in the project or in GS in general were assigned among six facilitated working groups, and each group was charged to envision risks within a sphere of project operations. Working groups covered FEPs with strong spatial characteristics - such as those related to the injection wellbore and simulated plume footprint - and "nonspatial" FEPs related to finance, regulations, legal, and stakeholder issues. Within these working groups, experts shared information, examined assumptions, refined and extended the FEP list, calibrated responses, and provided initial L and S values by consensus. Individual rankings were collected in a follow-up process via emailed spreadsheets. For each of L and S, three values were collected: Lower Bound, Best Guess, and Upper Bound. The Lower-Upper Bound ranges and the spreads among experts can be interpreted to yield rough confidence measures. Based on experts' responses, FEPs were ranked in terms of their L*S risk levels. FEP rankings were determined from individual (not consensus or averaged) results, thus no high-risk responses were damped out. The higher-risk FEPs were used to generate one or more concrete, well defined risk-bearing scenarios for each FEP. Any FEP scored by any expert as having associated risk of

  13. Barriers, Opportunities, and Strategies for Urban Ecosystem ...

    EPA Pesticide Factsheets

    Urban ecosystem restoration can be especially difficult to accomplish because of complications like industrial pollutants, population density, infrastructure, and expense, however, the unique opportunities in urban settings, including the potential to provide benefits to many people, can make urban restoration especially rewarding. The success of urban restoration projects—even those focused primarily on ecological targets—depends on incorporating the findings of social research, though that research is relatively rare. This work attempts to fill that gap by presenting barriers, opportunities, and strategies for restoration projects in urban settings. Building from interviews with restoration managers involved in a suite of aquatic restoration projects in Rhode Island, we contribute to the learning axis of adaptive management by identifying and synthesizing the lessons learned from managers’ work in urban settings. We then consider how managers can design creative solutions to accomplish restoration goals by thinking more broadly about the multiple social or institutional, biophysical, and discursive dimensions of barriers to and opportunities for urban restoration. This report describes the results from 27 interviews with restoration managers, and informs managers about barriers, opportunities, and strategies for restoration in urban settings.

  14. The DEVELOP National Program's Strategy for Communicating Applied Science Outcomes

    NASA Astrophysics Data System (ADS)

    Childs-Gleason, L. M.; Ross, K. W.; Crepps, G.; Favors, J.; Kelley, C.; Miller, T. N.; Allsbrook, K. N.; Rogers, L.; Ruiz, M. L.

    2016-12-01

    NASA's DEVELOP National Program conducts rapid feasibility projects that enable the future workforce and current decision makers to collaborate and build capacity to use Earth science data to enhance environmental management and policy. The program communicates its results and applications to a broad spectrum of audiences through a variety of methods: "virtual poster sessions" that engage the general public through short project videos and interactive dialogue periods, a "Campus Ambassador Corps" that communicates about the program and its projects to academia, scientific and policy conference presentations, community engagement activities and end-of-project presentations, project "hand-offs" providing results and tools to project partners, traditional publications (both gray literature and peer-reviewed), an interactive website project gallery, targeted brochures, and through multiple social media venues and campaigns. This presentation will describe the various methods employed by DEVELOP to communicate the program's scientific outputs, target audiences, general statistics, community response and best practices.

  15. NASA/NOAA implementation of the USAID-sponsored satellite ground station and data processing facility for Bangladesh

    NASA Technical Reports Server (NTRS)

    Dodge, J. C.; Vermillion, C. H.

    1983-01-01

    A description is given of a project to transfer multiple environmental satellite data reception, processing, and interpretation capabilities from the U.S. to Bangladesh. The goal of the project is to improve the management of resources related primarily to agriculture, water development, forestry, and fisheries. It is also hoped to improve the existing cyclone/storm surge warning system. An account is given of the interagency and international cooperation underlying the project. The remote-sensing installation in Dhaka, Bangladesh, is described, and the most likely system applications are summarized. Attention is also given to the special requirements concerning this type of technology transfer, and an assessment is made of the project's practical value to Bangladesh.

  16. End-to-end modeling as part of an integrated research program in the Bering Sea

    NASA Astrophysics Data System (ADS)

    Punt, André E.; Ortiz, Ivonne; Aydin, Kerim Y.; Hunt, George L.; Wiese, Francis K.

    2016-12-01

    Traditionally, the advice provided to fishery managers has focused on the trade-offs between short- and long-term yields, and between future resource size and expected future catches. The harvest control rules that are used to provide management advice consequently relate catches to stock biomass levels expressed relative to reference biomass levels. There are, however, additional trade-offs. Ecosystem-based fisheries management (EBFM) aims to consider fish and fisheries in their ecological context, taking into account physical, biological, economic, and social factors. However, making EBFM operational remains challenging. It is generally recognized that end-to-end modeling should be a key part of implementing EBFM, along with harvest control rules that use information in addition to estimates of stock biomass to provide recommendations for management actions. Here we outline the process for selecting among alternative management strategies in an ecosystem context and summarize a Field-integrated End-To-End modeling program, or FETE, intended to implement this process as part of the Bering Sea Project. A key aspect of this project was that, from the start, the FETE included a management strategy evaluation component to compare management strategies. Effective use of end-to-end modeling requires that the models developed for a system are indeed integrated across climate drivers, lower trophic levels, fish population dynamics, and fisheries and their management. We summarize the steps taken by the program managers to promote integration of modeling efforts by multiple investigators and highlight the lessons learned during the project that can be used to guide future use and design of end-to-end models.

  17. Marine and Hydrokinetic Technology Development Risk Management Framework

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snowberg, David; Weber, Jochem

    2015-09-01

    Over the past decade, the global marine and hydrokinetic (MHK) industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed an MHK Risk Management Framework. By addressing uncertainties, the MHK Risk Management Framework increases the likelihood of successful development of an MHK technology. It covers projects of any technical readiness level (TRL) or technical performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over themore » development cycle. This framework is intended for the development and deployment of a single MHK technology—not for multiple device deployments within a plant. This risk framework is intended to meet DOE’s risk management expectations for the MHK technology research and development efforts of the Water Power Program (see Appendix A). It also provides an overview of other relevant risk management tools and documentation.1 This framework emphasizes design and risk reviews as formal gates to ensure risks are managed throughout the technology development cycle. Section 1 presents the recommended technology development cycle, Sections 2 and 3 present tools to assess the TRL and TPL of the project, respectively. Section 4 presents a risk management process with design and risk reviews for actively managing risk within the project, and Section 5 presents a detailed description of a risk registry to collect the risk management information into one living document. Section 6 presents recommendations for collecting and using lessons learned throughout the development process.« less

  18. The water balance of the urban Salt Lake Valley: a multiple-box model validated by observations

    NASA Astrophysics Data System (ADS)

    Stwertka, C.; Strong, C.

    2012-12-01

    A main focus of the recently awarded National Science Foundation (NSF) EPSCoR Track-1 research project "innovative Urban Transitions and Arid-region Hydro-sustainability (iUTAH)" is to quantify the primary components of the water balance for the Wasatch region, and to evaluate their sensitivity to climate change and projected urban development. Building on the multiple-box model that we developed and validated for carbon dioxide (Strong et al 2011), mass balance equations for water in the atmosphere and surface are incorporated into the modeling framework. The model is used to determine how surface fluxes, ground-water transport, biological fluxes, and meteorological processes regulate water cycling within and around the urban Salt Lake Valley. The model is used to evaluate the hypotheses that increased water demand associated with urban growth in Salt Lake Valley will (1) elevate sensitivity to projected climate variability and (2) motivate more attentive management of urban water use and evaporative fluxes.

  19. Practical management of cumulative anthropogenic impacts with working marine examples.

    PubMed

    Wright, Andrew J; Kyhn, Line A

    2015-04-01

    Human pressure on the environment is expanding and intensifying, especially in coastal and offshore areas. Major contributors to this are the current push for offshore renewable energy sources, which are thought of as environmentally friendly sources of power, as well as the continued demand for petroleum. Human disturbances, including the noise almost ubiquitously associated with human activity, are likely to increase the incidence, magnitude, and duration of adverse effects on marine life, including stress responses. Stress responses have the potential to induce fitness consequences for individuals, which add to more obvious directed takes (e.g., hunting or fishing) to increase the overall population-level impact. To meet the requirements of marine spatial planning and ecosystem-based management, many efforts are ongoing to quantify the cumulative impacts of all human actions on marine species or populations. Meanwhile, regulators face the challenge of managing these accumulating and interacting impacts with limited scientific guidance. We believe there is scientific support for capping the level of impact for (at a minimum) populations in decline or with unknown statuses. This cap on impact can be facilitated through implementation of regular application cycles for project authorization or improved programmatic and aggregated impact assessments that simultaneously consider multiple projects. Cross-company collaborations and a better incorporation of uncertainty into decision making could also help limit, if not reduce, cumulative impacts of multiple human activities. These simple management steps may also form the basis of a rudimentary form of marine spatial planning and could be used in support of future ecosystem-based management efforts. © 2014 Society for Conservation Biology.

  20. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    NASA Astrophysics Data System (ADS)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should complement the current system, by creating permanent, sustained options for interactions between large research projects in similar fields. In the long run such a centre might improve on the host-based system because the centre-based solution allows multiple projects to be coordinated in conjunction by experienced science managers, using overlap in meeting organization, reporting, infrastructure, travel and so on. To still maintain close cooperation between project managers and lead PIs, we envision a virtual centre that creates extensive collaborative opportunities by organizing yearly retreats, a shared technical data base, et cetera. As "CESSMA" is work in progress (we have applied for funding for 2016-18), we would like to use this opportunity to discuss chances, potential problems, experiences and options for this attempt to institutionalise the very reason for this session: improved, coordinated, effective science coordination; and to create a central focal point for public / academia interactions.

  1. Management for Educational Development in Sri Lanka.

    ERIC Educational Resources Information Center

    Fernando, Neil, Ed.

    This document reports on 4 broad action programs, constituting a total of 15 projects, in 4 pilot districts in Sri Lanka. The programs, part of a larger effort by the Ministry of Education to actualize policy guidelines, have been attempts to bridge gaps between the capability and efficiency of the established school system and the multiple levels…

  2. Integrating Vegetation Classification, Mapping, and Strategic Inventory for Forest Management

    Treesearch

    C. K. Brewer; R. Bush; D. Berglund; J. A. Barber; S. R. Brown

    2006-01-01

    Many of the analyses needed to address multiple resource issues are focused on vegetation pattern and process relationships and most rely on the data models produced from vegetation classification, mapping, and/or inventory. The Northern Region Vegetation Mapping Project (R1-VMP) data models are based on these three integrally related, yet separate processes. This...

  3. 75 FR 4842 - Notice of Availability of Record of Decision for the Yuma Field Office Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... Conservation Service; the Yuma County Department of Public Works; the city of Yuma; the U.S. Army Yuma Proving..., recreational, geological, educational, scientific, and scenic values that balance multiple uses of the BLM... cultural resources for which the area is designated; (2) Recreation facilities are limited to projects that...

  4. Collaborative Research for Water Resource Management under Climate Change Conditions

    NASA Astrophysics Data System (ADS)

    Brundiers, K.; Garfin, G. M.; Gober, P.; Basile, G.; Bark, R. H.

    2010-12-01

    We present an ongoing project to co-produce science and policy called Collaborative Planning for Climate Change: An Integrated Approach to Water-Planning, Climate Downscaling, and Robust Decision-Making. The project responds to motivations related to dealing with sustainability challenges in research and practice: (a) state and municipal water managers seek research that addresses their planning needs; (b) the scientific literature and funding agencies call for more meaningful engagement between science and policy communities, in ways that address user needs, while advancing basic research; and (c) empirical research contributes to methods for the design and implementation of collaborative projects. To understand how climate change might impact water resources and management in the Southwest US, our project convenes local, state, and federal water management practitioners with climate-, hydrology-, policy-, and decision scientists. Three areas of research inform this collaboration: (a) the role of paleo-hydrology in water resources scenario construction; (b) the types of uncertainties that impact decision-making beyond climate and modeling uncertainty; and (c) basin-scale statistical and dynamical downscaling of climate models to generate hydrologic projections for regional water resources planning. The project engages all participants in the research process, from research design to workshops that build capacity for understanding data generation and sources of uncertainty to the discussion of water management decision contexts. A team of “science-practice translators” facilitates the collaboration between academic and professional communities. In this presentation we contextualize the challenges and opportunities of use-inspired science-policy research collaborations by contrasting the initial project design with the process of implementation. We draw from two sources to derive lessons learned: literature on collaborative research, and evaluations provided by participating scientists and water managers throughout the process. Lessons learned include: RESULTS: The research process needs to generate academic (peer-reviewed publications, grant proposals) and applied (usable dataset, communication support) products. Additionally, the project also strives for intangible products, e.g., the research currently continues to support efforts to predict future regional hydroclimatology, whereas management requires a paradigm shift toward anticipation of needs for adapting to multiple possible futures. APPROACH: Collaborative research is not a one-off event or consultation, but a process of mutual engagement that needs to allow for adaptive evolution of the project and its organization. TOPICS: With the acceptance of hydroclimatic non-stationarity, the focus of water managers shifts from reducing scientific uncertainty to enhancing their ability to present academically and politically defensible scenarios to their constituencies. This requires addressing the related need for exploring how to deal with political and institutional uncertainties in decision-making.

  5. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  6. Introduction of a quality improvement program in a children's hospital in Tehran: design, implementation, evaluation and lessons learned.

    PubMed

    Mohammadi, S Mehrdad; Mohammadi, S Farzad; Hedges, Jerris R; Zohrabi, Morteza; Ameli, Omid

    2007-08-01

    Reports addressing continuous quality improvement (CQI) methods in developing countries are scant and there are questions about the applicability of quality improvement methods in such settings. The structure and output of a formal quality improvement program implemented in a teaching hospital affiliated with the Tehran University of Medical Sciences is presented. OBJECTIVE METHOD: During a nine-month period, a multi-stage quality improvement program was implemented. It comprised: (i) training workshops; (ii) a steering committee; (iii) weekly consultation and facilitation of improvement projects; and (iv) a day-long demonstration and recognition meeting. Four cycles of workshops were held in which 132 employees were trained in the basics of CQI. Thirty improvement projects were initiated. Twenty-five of the projects were completed. In an evaluation survey more than 70% of respondents assessed a 'positive impact' on organizational culture, work efficiency and quality of services. More than 90% believed that the changes were sustained, and more than 60% reported that they have implemented additional improvement projects. Our quality improvement package supported rapid implementation of multiple projects. The underlying 'change structure' comprised the improvement teams, top management and the university's quality improvement office; it integrated project management, support and facilitation functions by the respective participant. Organization-wide change was more limited than anticipated. To institutionalize the program and ensure sustainability, a local structure for change should be organized, management coaching should be sustained, local facilitators should be developed, incentives should be established and physician involvement should be emphasized.

  7. Enhancing Understanding Of Coupled Human-Natural Systems Through Collaborative Learning

    NASA Astrophysics Data System (ADS)

    Santelmann, M. V.; Chan, S.; Morzillo, A.; Stebbins, A.; Wright, M.

    2012-12-01

    In the past decade, it has become clear that the dynamic nature of coupled human-natural systems must be better understood and incorporated into decision making. If the interactions between society and the rest of the ecosystem are poorly represented in system models, our ability to explore the potential consequences of feedbacks between the biophysical system and policy or management actions will be limited. Teams of researchers from three Oregon universities are collaborating with regional experts, water managers, and decision-makers to examine how climate change, population growth, and economic growth may alter the availability and use of water in the Willamette River Basin over the next one hundred years. A central project component is development of a version of the ENVISION modeling framework that will provide decision makers with a way to visualize the Willamette water system and evaluate the interaction of management choices with changing environmental and socioeconomic conditions. Key objectives of the project broader impacts team include: 1) assist with incorporating the human component of the system into the model, (2) fostering growth of the research team as an interdependent, interdisciplinary research community, and (3) communicating effectively with regional stakeholders. Through Learning-Action Networks we have been able to gather insightful, project-relevant knowledge on water use, management, policies and issues that impact water management in the region. We have identified the types of project outputs that managers and decision makers would find useful for anticipating water scarcity and informing integrative water systems responses. Events and processes used to accomplish our objectives began with field trips involving researchers, educators, and other stakeholders. Follow-up meetings and an all day symposium featured focus group interviews, plenary sessions on project progress, and interactive poster sessions in which participants could help identify water related policies and actions they would like to see modeled. Participants assisted in compiling an interactive table of potential policies and actions organized by water use sector and policy type (e.g., regulatory vs. incentive based). Involvement of K-12 educators and development of innovative interdisciplinary courses has enhanced the broader impacts of the project and helped us achieve multiple project objectives. We present plans to build on initial collaborative learning experiences to promote project outcomes that will advance coupled human-natural systems research and enhance the utility of model outcomes in water management.

  8. Integrating Engineering Data Systems for NASA Spaceflight Projects

    NASA Technical Reports Server (NTRS)

    Carvalho, Robert E.; Tollinger, Irene; Bell, David G.; Berrios, Daniel C.

    2012-01-01

    NASA has a large range of custom-built and commercial data systems to support spaceflight programs. Some of the systems are re-used by many programs and projects over time. Management and systems engineering processes require integration of data across many of these systems, a difficult problem given the widely diverse nature of system interfaces and data models. This paper describes an ongoing project to use a central data model with a web services architecture to support the integration and access of linked data across engineering functions for multiple NASA programs. The work involves the implementation of a web service-based middleware system called Data Aggregator to bring together data from a variety of systems to support space exploration. Data Aggregator includes a central data model registry for storing and managing links between the data in disparate systems. Initially developed for NASA's Constellation Program needs, Data Aggregator is currently being repurposed to support the International Space Station Program and new NASA projects with processes that involve significant aggregating and linking of data. This change in user needs led to development of a more streamlined data model registry for Data Aggregator in order to simplify adding new project application data as well as standardization of the Data Aggregator query syntax to facilitate cross-application querying by client applications. This paper documents the approach from a set of stand-alone engineering systems from which data are manually retrieved and integrated, to a web of engineering data systems from which the latest data are automatically retrieved and more quickly and accurately integrated. This paper includes the lessons learned through these efforts, including the design and development of a service-oriented architecture and the evolution of the data model registry approaches as the effort continues to evolve and adapt to support multiple NASA programs and priorities.

  9. Integrated analysis for population estimation, management impact evaluation, and decision-making for a declining species

    USGS Publications Warehouse

    Crawford, Brian A.; Moore, Clinton; Norton, Terry M.; Maerz, John C.

    2018-01-01

    A challenge for making conservation decisions is predicting how wildlife populations respond to multiple, concurrent threats and potential management strategies, usually under substantial uncertainty. Integrated modeling approaches can improve estimation of demographic rates necessary for making predictions, even for rare or cryptic species with sparse data, but their use in management applications is limited. We developed integrated models for a population of diamondback terrapins (Malaclemys terrapin) impacted by road-associated threats to (i) jointly estimate demographic rates from two mark-recapture datasets, while directly estimating road mortality and the impact of management actions deployed during the study; and (ii) project the population using population viability analysis under simulated management strategies to inform decision-making. Without management, population extirpation was nearly certain due to demographic impacts of road mortality, predators, and vegetation. Installation of novel flashing signage increased survival of terrapins that crossed roads by 30%. Signage, along with small roadside barriers installed during the study, increased population persistence probability, but the population was still predicted to decline. Management strategies that included actions targeting multiple threats and demographic rates resulted in the highest persistence probability, and roadside barriers, which increased adult survival, were predicted to increase persistence more than other actions. Our results support earlier findings showing mitigation of multiple threats is likely required to increase the viability of declining populations. Our approach illustrates how integrated models may be adapted to use limited data efficiently, represent system complexity, evaluate impacts of threats and management actions, and provide decision-relevant information for conservation of at-risk populations.

  10. The delicate balance of keeping it all together: Using social capital to manage multiple medications for patients on dialysis.

    PubMed

    Parker, Wendy M; Ferreira, Kristine; Vernon, Lauren; Cardone, Katie E

    Patients with end-stage kidney disease (ESKD) typically have high medication burdens with numerous medications and specialized instructions. Limited data exist regarding ESKD patient perspectives on medication management. Why can some patients self-manage? Which organizational techniques are used? This project sought to determine experiences and attitudes regarding medication management among hemodialysis patients. Group interviews were conducted with adult patients from 3 dialysis facilities. Semi-structured interviews solicited information about medication self-management and views on related services. Interviews were recorded and transcribed and data were analyzed using inductive, thematic coding. Participants reported medication regimens complicated by the dialysis schedule, co-morbid conditions and multiple prescribers. Patients engaged in various coping strategies, including reliance on activating social capital and/or family social support, to manage their medications and health. When described, most thought medication management services would be beneficial, but not necessarily for themselves, despite some having histories of medication mismanagement. Patients on hemodialysis often develop strategies for managing medications that rely heavily on a social network, and strategies may not be discussed with healthcare providers. Social capital is a useful framework for considering patients' lifestyles and support structure when designing a medication regimen. Future research should explore this idea more proactively. Copyright © 2016 Elsevier Inc. All rights reserved.

  11. Engaging Clinical Nurses in Quality Improvement Projects.

    PubMed

    Moore, Susan; Stichler, Jaynelle F

    2015-10-01

    Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.

  12. Engineering Technical Support Center Annual Report Fiscal ...

    EPA Pesticide Factsheets

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  13. Ecological requirements for pallid sturgeon reproduction and recruitment in the Lower Missouri River: Annual report 2010

    USGS Publications Warehouse

    DeLonay, Aaron J.; Jacobson, Robert B.; Papoulias, Diana M.; Wildhaber, Mark L.; Chojnacki, Kimberly A.; Pherigo, Emily K.; Haas, Justin D.; Mestl, Gerald E.

    2012-01-01

    The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2010 scope of work primarily address spawning as a probable factor limiting pallid sturgeon survival and recovery, although limited pilot studies also have been initiated to examine the requirements of early life stages. The research is designed to inform management decisions affecting channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2010.

  14. Managing Data, Provenance and Chaos through Standardization and Automation at the Georgia Coastal Ecosystems LTER Site

    NASA Astrophysics Data System (ADS)

    Sheldon, W.

    2013-12-01

    Managing data for a large, multidisciplinary research program such as a Long Term Ecological Research (LTER) site is a significant challenge, but also presents unique opportunities for data stewardship. LTER research is conducted within multiple organizational frameworks (i.e. a specific LTER site as well as the broader LTER network), and addresses both specific goals defined in an NSF proposal as well as broader goals of the network; therefore, every LTER data can be linked to rich contextual information to guide interpretation and comparison. The challenge is how to link the data to this wealth of contextual metadata. At the Georgia Coastal Ecosystems LTER we developed an integrated information management system (GCE-IMS) to manage, archive and distribute data, metadata and other research products as well as manage project logistics, administration and governance (figure 1). This system allows us to store all project information in one place, and provide dynamic links through web applications and services to ensure content is always up to date on the web as well as in data set metadata. The database model supports tracking changes over time in personnel roles, projects and governance decisions, allowing these databases to serve as canonical sources of project history. Storing project information in a central database has also allowed us to standardize both the formatting and content of critical project information, including personnel names, roles, keywords, place names, attribute names, units, and instrumentation, providing consistency and improving data and metadata comparability. Lookup services for these standard terms also simplify data entry in web and database interfaces. We have also coupled the GCE-IMS to our MATLAB- and Python-based data processing tools (i.e. through database connections) to automate metadata generation and packaging of tabular and GIS data products for distribution. Data processing history is automatically tracked throughout the data lifecycle, from initial import through quality control, revision and integration by our data processing system (GCE Data Toolbox for MATLAB), and included in metadata for versioned data products. This high level of automation and system integration has proven very effective in managing the chaos and scalability of our information management program.

  15. Ecological requirements for pallid sturgeon reproduction and recruitment in the Missouri River—Annual report 2014

    USGS Publications Warehouse

    Delonay, Aaron J.; Chojnacki, Kimberly A.; Jacobson, Robert B.; Braaten, Patrick J.; Buhl, Kevin J.; Elliott, Caroline M.; Erwin, Susannah O.; Faulkner, Jacob D.A.; Candrl, James S.; Fuller, David B.; Backes, Kenneth M.; Haddix, Tyler M.; Rugg, Matthew L.; Wesolek, Christopher J.; Eder, Brandon L.; Mestl, Gerald E.

    2016-03-16

    The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with collaborating research partners and in cooperation with the U.S. Army Corps of Engineers, Missouri River Recovery Program–Integrated Science Program. The project research consists of several interdependent and complementary tasks that involve multiple disciplines.The project research tasks in the 2014 scope of work emphasized understanding of reproductive migrations and spawning of adult pallid sturgeon and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and downstream reaches of the Milk River, and the Lower Yellowstone River. The project research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2014.

  16. Uncertainty Analysis of Consequence Management (CM) Data Products.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, Brian D.; Eckert-Gallup, Aubrey Celia; Cochran, Lainy Dromgoole

    The goal of this project is to develop and execute methods for characterizing uncertainty in data products that are deve loped and distributed by the DOE Consequence Management (CM) Program. A global approach to this problem is necessary because multiple sources of error and uncertainty from across the CM skill sets contribute to the ultimate p roduction of CM data products. This report presents the methods used to develop a probabilistic framework to characterize this uncertainty and provides results for an uncertainty analysis for a study scenario analyzed using this framework.

  17. Managing Institutional and Sociocultural Challenges through Sociotransformative Constructivism: A Longitudinal Case Study of a High School Science Teacher

    ERIC Educational Resources Information Center

    Rodriguez, Alberto J.

    2015-01-01

    Using a case study approach, this manuscript describes the professional transformation of Gary--an Anglo, male novice teacher--by focusing on his first two years of teaching in a culturally diverse and economically disadvantaged school. As a participant of a larger hybrid, intervention project with peers, Gary received multiple hands-on and…

  18. Initiating the 2002 Mars Science Laboratory (MSL) Focused Technology Program

    NASA Technical Reports Server (NTRS)

    Caffrey, Robert T.; Udomkesmalee, Gabriel; Hayati, Samad A.

    2004-01-01

    The Mars Science Laboratory (MSL) Project is an aggressive mission launching in 2009 to deliver a new generation of rover safely to the surface of Mars and conduct comprehensive in situ investigations using a new generation of instruments. This system will be designed to land with precision and be capable of operating over a large percentage on the surface of Mars. It will have capabilities that will support NASA's scientific goals into the next decade of exphation. The MSL Technology program is developing a wide-range of technologies needed for this Mission and potentially other space missions. The MSL Technology Program reports to both the MSL Project and the Mars Technology Program (MTP). The dual reporting process creates a challenging management situation, but ensures the new technology meets both the specific MSL requirements and the broader Mars Program requirements. MTP is a NASA-wide technology development program managed by the Jet Propulsion Laboratory (JPL) and is divided into a Focused Program and a Base Program. The Focused Technology Program addresses technologies that are specific and critical to near-term missions, while the Base Technology Program addresses those technologies that are applicable to multiple missions and which can be characterized as longer term, higher risk, and high payoff technologies. The MSL Technology Program is under the Focused Program and is tightly coupled to MSL's mission milestones and deliverables. The technology budget is separate from the flight Project budget, but the technology s requirements and the development process are tightly coordinated with the Project. The Technology Program combines proven management techniques of flight projects with commercial and academic technology management strategies, to create a technology management program that meets the near-term requirements of MSL and the long-term requirements of MTP. This paper examines the initiation of 2002 MSL Technology program. Some of the areas discussed in this paper include technology definition, task selection, technology management, and technology assessment.

  19. Application of multiple tracers (SF6 and chloride) to identify the transport by characteristics of contaminant at two separate contaminated sites

    NASA Astrophysics Data System (ADS)

    Lee, K. K.; Lee, S. S.; Kim, H. H.; Koh, E. H.; Kim, M. O.; Lee, K.; Kim, H. J.

    2016-12-01

    Multiple tracers were applied for source and pathway detection at two different sites. CO2 gas injected in the subsurface for a shallow-depth CO2 injection and leak test can be regarded as a potential contaminant source. Therefore, it is necessary to identify the migration pattern of CO2 gas. Also, at a DNAPL contaminated site, it is important to figure out the characteristics of plume evolution from the source zone. In this study, multiple tracers (SF6 and chloride) were used to evaluate the applicability of volatile and non-volatile tracers and to identify the characteristics of contaminant transport at each CO2 injection and leak test site and DNAPL contaminated site. Firstly, at the CO2 test site, multiple tracers were used to perform the single well push-drift-pull tracer test at total 3 specific depth zones. As results of tests, volatile and non-volatile tracers showed different mass recovery percentage. Most of chloride mass was recovered but less than half of SF6 mass was recovered due to volatile property. This means that only gaseous SF6 leak out to unsaturated zone. However, breakthrough curves of both tracers indicated similar peak time, effective porosity, and regional groundwater velocity. Also, at both contaminated sites, natural gradient tracer tests were performed with multiple tracers. With the results of natural gradient tracer test, it was possible to confirm the applicability of multiple tracers and to understand the contaminant transport in highly heterogeneous aquifer systems through the long-term monitoring of tracers. Acknowledgement: financial support was provided by the R&D Project on Environmental Management of Geologic CO2 Storage)" from the KEITI (Project Number: 2014001810003) and Korea Ministry of Environment as "The GAIA project (2014000540010)".

  20. Power Hardware-in-the-Loop Testing of a Smart Distribution System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mendoza Carrillo, Ismael; Breaden, Craig; Medley, Paige

    This paper presents the results of the third and final phase of the National Renewable Energy Lab (NREL) INTEGRATE demonstration: Smart Distribution. For this demonstration, high penetrations of solar PV and wind energy systems were simulated in a power hardware-in-the-loop set-up using a smart distribution test feeder. Simulated and real DERs were controlled by a real-time control platform, which manages grid constraints under high clean energy deployment levels. The power HIL testing, conducted at NREL's ESIF smart power lab, demonstrated how dynamically managing DER increases the grid's hosting capacity by leveraging active network management's (ANM) safe and reliable control framework.more » Results are presented for how ANM's real-time monitoring, automation, and control can be used to manage multiple DERs and multiple constraints associated with high penetrations of DER on a distribution grid. The project also successfully demonstrated the importance of escalating control actions given how ANM enables operation of grid equipment closer to their actual physical limit in the presence of very high levels of intermittent DER.« less

  1. Lessons Learned Implementing DOORS in a Citrix Environment

    NASA Technical Reports Server (NTRS)

    Bussman, Marie

    2005-01-01

    NASA's James Web Space Telescope (JWST) Project is a large multi-national project with geographically dispersed contractors that all need access to the Projects requirement database. Initially, the project utilized multiple DOORS databases with the built-in partitions feature to exchange modules amongst the various contractor sites. As the requirements databases matured the use of partitions became extremely difficult. There have been many issues such as incompatible versions of DOORS, inefficient mechanism for sharing modules, security concerns, performance issues, and inconsistent document import and export formats. Deployment of the client software with limited IT resources available was also an issue. The solution chosen by JWST was to integrate the use of a Citrix environment with the DOORS database to address most of the project concerns. The use of the Citrix solution allowed a single Requirements database in a secure environment via a web interface. The Citrix environment allows JWST to upgrade to the most current version of DOORS without having to coordinate multiple sites and user upgrades. The single requirements database eliminates a multitude of Configuration Management concerns and facilitated the standardization of documentation formats. This paper discusses the obstacles and the lessons learned throughout the installation, implementation, usage and deployment process of a centralized DOORS database solution.

  2. Integrating Semantic Information in Metadata Descriptions for a Geoscience-wide Resource Inventory.

    NASA Astrophysics Data System (ADS)

    Zaslavsky, I.; Richard, S. M.; Gupta, A.; Valentine, D.; Whitenack, T.; Ozyurt, I. B.; Grethe, J. S.; Schachne, A.

    2016-12-01

    Integrating semantic information into legacy metadata catalogs is a challenging issue and so far has been mostly done on a limited scale. We present experience of CINERGI (Community Inventory of Earthcube Resources for Geoscience Interoperability), an NSF Earthcube Building Block project, in creating a large cross-disciplinary catalog of geoscience information resources to enable cross-domain discovery. The project developed a pipeline for automatically augmenting resource metadata, in particular generating keywords that describe metadata documents harvested from multiple geoscience information repositories or contributed by geoscientists through various channels including surveys and domain resource inventories. The pipeline examines available metadata descriptions using text parsing, vocabulary management and semantic annotation and graph navigation services of GeoSciGraph. GeoSciGraph, in turn, relies on a large cross-domain ontology of geoscience terms, which bridges several independently developed ontologies or taxonomies including SWEET, ENVO, YAGO, GeoSciML, GCMD, SWO, and CHEBI. The ontology content enables automatic extraction of keywords reflecting science domains, equipment used, geospatial features, measured properties, methods, processes, etc. We specifically focus on issues of cross-domain geoscience ontology creation, resolving several types of semantic conflicts among component ontologies or vocabularies, and constructing and managing facets for improved data discovery and navigation. The ontology and keyword generation rules are iteratively improved as pipeline results are presented to data managers for selective manual curation via a CINERGI Annotator user interface. We present lessons learned from applying CINERGI metadata augmentation pipeline to a number of federal agency and academic data registries, in the context of several use cases that require data discovery and integration across multiple earth science data catalogs of varying quality and completeness. The inventory is accessible at http://cinergi.sdsc.edu, and the CINERGI project web page is http://earthcube.org/group/cinergi

  3. Sensor Webs and Virtual Globes: Enabling Understanding of Changes in a partially Glaciated Watershed

    NASA Astrophysics Data System (ADS)

    Heavner, M.; Fatland, D. R.; Habermann, M.; Berner, L.; Hood, E.; Connor, C.; Galbraith, J.; Knuth, E.; O'Brien, W.

    2008-12-01

    The University of Alaska Southeast is currently implementing a sensor web identified as the SouthEast Alaska MOnitoring Network for Science, Telecommunications, Education, and Research (SEAMONSTER). SEAMONSTER is operating in the partially glaciated Mendenhall and Lemon Creek Watersheds, in the Juneau area, on the margins of the Juneau Icefield. These watersheds are studied for both 1. long term monitoring of changes, and 2. detection and analysis of transient events (such as glacier lake outburst floods). The heterogeneous sensors (meteorologic, dual frequency GPS, water quality, lake level, etc), power and bandwidth constraints, and competing time scales of interest require autonomous reactivity of the sensor web. They also present challenges for operational management of the sensor web. The harsh conditions on the glaciers provide additional operating constraints. The tight integration of the sensor web and virtual global enabling technology enhance the project in multiple ways. We are utilizing virtual globe infrastructures to enhance both sensor web management and data access. SEAMONSTER utilizes virtual globes for education and public outreach, sensor web management, data dissemination, and enabling collaboration. Using a PosgreSQL with GIS extensions database coupled to the Open Geospatial Consortium (OGC) Geoserver, we generate near-real-time auto-updating geobrowser files of the data in multiple OGC standard formats (e.g KML, WCS). Additionally, embedding wiki pages in this database allows the development of a geospatially aware wiki describing the projects for better public outreach and education. In this presentation we will describe how we have implemented these technologies to date, the lessons learned, and our efforts towards greater OGC standard implementation. A major focus will be on demonstrating how geobrowsers and virtual globes have made this project possible.

  4. Relative importance of professional practice and engineering management competencies

    NASA Astrophysics Data System (ADS)

    Pons, Dirk

    2016-09-01

    Problem: The professional practice of engineering always involves engineering management, but it is difficult to know what specifically to include in the undergraduate curriculum. Approach: The population of New Zealand practising engineers was surveyed to determine the importance they placed on specific professional practice and engineering management competencies. Findings: Results show that communication and project planning were the two most important topics, followed by others as identified. The context in which practitioners use communication skills was found to be primarily with project management, with secondary contexts identified. The necessity for engineers to develop the ability to use multiple soft skills in an integrative manner is strongly supported by the data. Originality: This paper is one of only a few large-scale surveys of practising engineers to have explored the soft skill attributes. It makes a didactic contribution of providing a ranked list of topics which can be used for designing the curriculum and prioritising teaching effort, which has not previously been achieved. It yields the new insight that combinations of topics are sometimes more important than individual topics.

  5. Habitat Demonstration Unit Project Leadership and Management Strategies

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

  6. Sustainable Hydro Assessment and Groundwater Recharge Projects (SHARP) in Germany - Water Balance Models

    NASA Astrophysics Data System (ADS)

    Niemand, C.; Kuhn, K.; Schwarze, R.

    2010-12-01

    SHARP is a European INTERREG IVc Program. It focuses on the exchange of innovative technologies to protect groundwater resources for future generations by considering the climate change and the different geological and geographical conditions. Regions involved are Austria, United Kingdom, Poland, Italy, Macedonia, Malta, Greece and Germany. They will exchange practical know-how and also determine know-how demands concerning SHARP’s key contents: general groundwater management tools, artificial groundwater recharge technologies, groundwater monitoring systems, strategic use of groundwater resources for drinking water, irrigation and industry, techniques to save water quality and quantity, drinking water safety plans, risk management tools and water balance models. SHARP Outputs & results will influence the regional policy in the frame of sustainable groundwater management to save and improve the quality and quantity of groundwater reservoirs for future generations. The main focus of the Saxon State Office for Environment, Agriculture and Landscape in this project is the enhancement and purposive use of water balance models. Already since 1992 scientists compare different existing water balance models on different scales and coupled with groundwater models. For example in the KLIWEP (Assessment of Impacts of Climate Change Projections on Water and Matter Balance for the Catchment of River Parthe in Saxony) project the coupled model WaSiM-ETH - PCGEOFIM® has been used to study the impact of climate change on water balance and water supplies. The project KliWES (Assessment of the Impacts of Climate Change Projections on Water and Matter Balance for Catchment Areas in Saxony) still running, comprises studies of fundamental effects of climate change on catchments in Saxony. Project objective is to assess Saxon catchments according to the vulnerability of their water resources towards climate change projections in order to derive region-specific recommendations for management actions. The model comparisons within reference areas showed significant differences in outcome. The values of water balance components calculated with different models partially fluctuate by a multiple of their value. The SHARP project was prepared in several previous projects that were testing suitable water balance models and is now able to assist the knowledge transfer.

  7. Multiple stressors threatening the future of the Baltic Sea-Kattegat marine ecosystem: implications for policy and management actions.

    PubMed

    Jutterström, S; Andersson, H C; Omstedt, A; Malmaeus, J M

    2014-09-15

    The paper discusses the combined effects of ocean acidification, eutrophication and climate change on the Baltic Sea and the implications for current management strategies. The scientific basis is built on results gathered in the BONUS+ projects Baltic-C and ECOSUPPORT. Model results indicate that the Baltic Sea is likely to be warmer, more hypoxic and more acidic in the future. At present management strategies are not taking into account temporal trends and potential ecosystem change due to warming and/or acidification, and therefore fulfilling the obligations specified within the Marine Strategy Framework Directive, OSPAR and HELCOM conventions and national environmental objectives may become significantly more difficult. The paper aims to provide a basis for a discussion on the effectiveness of current policy instruments and possible strategies for setting practical environmental objectives in a changing climate and with multiple stressors. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.

  8. System Safety in an IT Service Organization

    NASA Astrophysics Data System (ADS)

    Parsons, Mike; Scutt, Simon

    Within Logica UK, over 30 IT service projects are considered safetyrelated. These include operational IT services for airports, railway infrastructure asset management, nationwide radiation monitoring and hospital medical records services. A recent internal audit examined the processes and documents used to manage system safety on these services and made a series of recommendations for improvement. This paper looks at the changes and the challenges to introducing them, especially where the service is provided by multiple units supporting both safety and non-safety related services from multiple locations around the world. The recommendations include improvements to service agreements, improved process definitions, routine safety assessment of changes, enhanced call logging, improved staff competency and training, and increased safety awareness. Progress is reported as of today, together with a road map for implementation of the improvements to the service safety management system. A proposal for service assurance levels (SALs) is discussed as a way forward to cover the wide variety of services and associated safety risks.

  9. Integrating science, policy and stakeholder perspectives for water resource management

    NASA Astrophysics Data System (ADS)

    Barbour, Emily; Allan, Andrew; Whitehead, Paul; Salehin, Mashfiqus; Lazzar, Attila; Lim, Michelle; Munsur Rahman, Md.

    2015-04-01

    Successful management of water resources requires an integrated approach considering the complex relationships between different biophysical processes, governance frameworks and socio-economic factors. The Ecosystem Services for Poverty Alleviation (ESPA) Deltas project has developed a range of socio-economic scenarios using a participatory approach, and applied these across different biophysical models as well as an integrated environmental, socio-economic model of the Ganges-Brahmaputra-Meghna (GBM) Delta. This work demonstrates a novel approach through the consideration of multiple ecosystem services and related socio-economic factors in the development of scenarios; the application of these to multiple models at multiple scales; and the participatory approach to improve project outcomes and engage national level stakeholders and policy makers. Scenarios can assist in planning for an uncertain future through exploring plausible alternatives. To adequately assess the potential impacts of future changes and management strategies on water resources, the wider biophysical, socio-economic and governance context needs to be considered. A series of stakeholder workshops have been held in Bangladesh to identify issues of main concern relating to the GBM Delta; to iteratively develop scenario narratives for business as usual, less sustainable, and more sustainable development pathways; and to translate these qualitative scenarios into a quantitative form suitable for analysis. The combined impact of these scenarios and climate change on water quantity and quality within the GBM Basin are demonstrated. Results suggest that climate change is likely to impact on both peak and low flows to a greater extent than most socio-economic changes. However, the diversion of water from the Ganges and Brahmaputra has the potential to significantly impact on water availability in Bangladesh depending on the timing and quantity of diversions. Both climate change and socio-economic scenarios are likely to impact on water quality. This work provides the foundation for investigating the effects of different policy and management interventions in coastal Bangladesh, and exploring trade-offs between different water resource objectives, and other ecosystem, social or economic objectives.

  10. Laboratory information management system: an example of international cooperation in Namibia.

    PubMed

    Colangeli, Patrizia; Ferrilli, Monica; Quaranta, Fabrizio; Malizia, Elio; Mbulu, Rosa-Stella; Mukete, Esther; Iipumbu, Lukas; Kamhulu, Anna; Tjipura-Zaire, Georgina; Di Francesco, Cesare; Lelli, Rossella; Scacchia, Massimo

    2012-01-01

    The authors describe the project undertaken by the Istituto G. Caporale to provide a laboratory information management system (LIMS) to the Central Veterinary Laboratory (CVL) in Windhoek, Namibia. This robust laboratory management tool satisfies Namibia's information obligations under international quality standard ISO 17025:2005. The Laboratory Information Management System (LIMS) for Africa was designed to collect and manage all necessary information on samples, tests and test results. The system involves the entry of sample data on arrival, as required by Namibian sampling plans, the tracking of samples through the various sections of the CVL, the collection of test results, generation of test reports and monitoring of outbreaks through data interrogation functions, eliminating multiple registrations of the same data on paper records. It is a fundamental component of the Namibian veterinary information system.

  11. Perspectives on the use of green infrastructure for stormwater management in Cleveland and Milwaukee.

    PubMed

    Keeley, Melissa; Koburger, Althea; Dolowitz, David P; Medearis, Dale; Nickel, Darla; Shuster, William

    2013-06-01

    Green infrastructure is a general term referring to the management of landscapes in ways that generate human and ecosystem benefits. Many municipalities have begun to utilize green infrastructure in efforts to meet stormwater management goals. This study examines challenges to integrating gray and green infrastructure for stormwater management, informed by interviews with practitioners in Cleveland, OH and Milwaukee WI. Green infrastructure in these cities is utilized under conditions of extreme fiscal austerity and its use presents opportunities to connect stormwater management with urban revitalization and economic recovery while planning for the effects of negative- or zero-population growth. In this context, specific challenges in capturing the multiple benefits of green infrastructure exist because the projects required to meet federally mandated stormwater management targets and the needs of urban redevelopment frequently differ in scale and location.

  12. Perspectives on the Use of Green Infrastructure for Stormwater Management in Cleveland and Milwaukee

    NASA Astrophysics Data System (ADS)

    Keeley, Melissa; Koburger, Althea; Dolowitz, David P.; Medearis, Dale; Nickel, Darla; Shuster, William

    2013-06-01

    Green infrastructure is a general term referring to the management of landscapes in ways that generate human and ecosystem benefits. Many municipalities have begun to utilize green infrastructure in efforts to meet stormwater management goals. This study examines challenges to integrating gray and green infrastructure for stormwater management, informed by interviews with practitioners in Cleveland, OH and Milwaukee WI. Green infrastructure in these cities is utilized under conditions of extreme fiscal austerity and its use presents opportunities to connect stormwater management with urban revitalization and economic recovery while planning for the effects of negative- or zero-population growth. In this context, specific challenges in capturing the multiple benefits of green infrastructure exist because the projects required to meet federally mandated stormwater management targets and the needs of urban redevelopment frequently differ in scale and location.

  13. An image database management system for conducting CAD research

    NASA Astrophysics Data System (ADS)

    Gruszauskas, Nicholas; Drukker, Karen; Giger, Maryellen L.

    2007-03-01

    The development of image databases for CAD research is not a trivial task. The collection and management of images and their related metadata from multiple sources is a time-consuming but necessary process. By standardizing and centralizing the methods in which these data are maintained, one can generate subsets of a larger database that match the specific criteria needed for a particular research project in a quick and efficient manner. A research-oriented management system of this type is highly desirable in a multi-modality CAD research environment. An online, webbased database system for the storage and management of research-specific medical image metadata was designed for use with four modalities of breast imaging: screen-film mammography, full-field digital mammography, breast ultrasound and breast MRI. The system was designed to consolidate data from multiple clinical sources and provide the user with the ability to anonymize the data. Input concerning the type of data to be stored as well as desired searchable parameters was solicited from researchers in each modality. The backbone of the database was created using MySQL. A robust and easy-to-use interface for entering, removing, modifying and searching information in the database was created using HTML and PHP. This standardized system can be accessed using any modern web-browsing software and is fundamental for our various research projects on computer-aided detection, diagnosis, cancer risk assessment, multimodality lesion assessment, and prognosis. Our CAD database system stores large amounts of research-related metadata and successfully generates subsets of cases that match the user's desired search criteria.

  14. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    NASA Astrophysics Data System (ADS)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  15. Project Catch: A space based solution to combat illegal, unreported and unregulated fishing. Part I: Vessel monitoring system

    NASA Astrophysics Data System (ADS)

    Detsis, Emmanouil; Brodsky, Yuval; Knudtson, Peter; Cuba, Manuel; Fuqua, Heidi; Szalai, Bianca

    2012-11-01

    Space assets have a unique opportunity to play a more active role in global resource management. There is a clear need to develop resource management tools in a global framework. Illegal, Unregulated and Unreported (IUU) fishing is placing pressure on the health and size of fishing stocks around the world. Earth observation systems can provide fishery management organizations with cost effective monitoring of large swaths of ocean. Project Catch is a fisheries management project based upon the complimentary, but independent Catch-VMS and Catch-GIS systems. Catch-VMS is a Vessel Monitoring System with increased fidelity over existing offerings. Catch-GIS is a Geographical Information System that combines VMS information with existing Earth Observation data and other data sources to identify Illegal, Unregulated and Unreported (IUU) fishing. Project Catch was undertaken by 19 Masters students from the 2010 class of the International Space University. In this paper, the space-based system architecture of Project Catch is presented and analyzed. The rationale for the creation of the system, as well as the engineering trade-off studies in its creation, are discussed. The Catch-VMS proposal was envisaged in order to address two specific problems: (1) the expansion of illegal fishing to high-latitude regions where existing satellite systems coverage is an issue and (2) the lack of coverage in remote oceanic regions due to reliance on coastal-based monitoring. Catch-VMS utilizes ship-borne transponders and hosted-payload receivers on a Global Navigation Satellite System in order to monitor the position and activity of compliant fishing vessels. Coverage is global and continuous with multiple satellites in view providing positional verification through multilateration techniques. The second part of the paper briefly describes the Catch-GIS system and investigates its cost of implementation.

  16. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico.

    PubMed

    Dalyander, P Soupy; Meyers, Michelle; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark; Ford, Mark

    2016-12-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a prototype for using structured decision-making in support of engineering projects in dynamic environments where mid-construction decisions may arise; highlights uncertainty about barrier island physical processes that limit the ability to make robust decisions; and demonstrates the potential for direct incorporation of process-based models in a formal adaptive management decision framework. Published by Elsevier Ltd.

  17. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico

    USGS Publications Warehouse

    Dalyander, P. Soupy; Meyers, Michelle B.; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark R.; Ford, Mark

    2016-01-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a prototype for using structured decision-making in support of engineering projects in dynamic environments where mid-construction decisions may arise; highlights uncertainty about barrier island physical processes that limit the ability to make robust decisions; and demonstrates the potential for direct incorporation of process-based models in a formal adaptive management decision framework.

  18. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

  19. Lessons from NASA Applied Sciences Program: Success Factors in Applying Earth Science in Decision Making

    NASA Astrophysics Data System (ADS)

    Friedl, L. A.; Cox, L.

    2008-12-01

    The NASA Applied Sciences Program collaborates with organizations to discover and demonstrate applications of NASA Earth science research and technology to decision making. The desired outcome is for public and private organizations to use NASA Earth science products in innovative applications for sustained, operational uses to enhance their decisions. In addition, the program facilitates the end-user feedback to Earth science to improve products and demands for research. The Program thus serves as a bridge between Earth science research and technology and the applied organizations and end-users with management, policy, and business responsibilities. Since 2002, the Applied Sciences Program has sponsored over 115 applications-oriented projects to apply Earth observations and model products to decision making activities. Projects have spanned numerous topics - agriculture, air quality, water resources, disasters, public health, aviation, etc. The projects have involved government agencies, private companies, universities, non-governmental organizations, and foreign entities in multiple types of teaming arrangements. The paper will examine this set of applications projects and present specific examples of successful use of Earth science in decision making. The paper will discuss scientific, organizational, and management factors that contribute to or impede the integration of the Earth science research in policy and management. The paper will also present new methods the Applied Sciences Program plans to implement to improve linkages between science and end users.

  20. A Case Review: Integrating Lewin’s Theory with Lean’s System Approach for Change

    PubMed

    Wojciechowski, Elizabeth; Pearsall, Tabitha; Murphy, Patricia; French, Eileen

    2016-05-31

    The complexity of healthcare calls for interprofessional collaboration to improve and sustain the best outcomes for safe and high quality patient care. Historically, rehabilitation nursing has been an area that relies heavily on interprofessional relationships. Professionals from various disciplines often subscribe to different change management theories for continuous quality improvement. Through a case review, authors describe how a large, Midwestern, rehabilitation hospital used the crosswalk methodology to facilitate interprofessional collaboration and develop an intervention model for implementing and sustaining bedside shift reporting. The authors provide project background and offer a brief overview of the two common frameworks used in this project, Lewin’s Three-Step Model for Change and the Lean Systems Approach. The description of the bedside shift report project methods demonstrates that multiple disciplines are able to utilize a common framework for leading and sustaining change to support outcomes of high quality and safe care, and capitalize on the opportunities of multiple views and discipline-specific approaches. The conclusion discusses outcomes, future initiatives, and implications for nursing practice.

  1. Integrated Data & Analysis in Support of Informed and Transparent Decision Making

    NASA Astrophysics Data System (ADS)

    Guivetchi, K.

    2012-12-01

    The California Water Plan includes a framework for improving water reliability, environmental stewardship, and economic stability through two initiatives - integrated regional water management to make better use of local water sources by integrating multiple aspects of managing water and related resources; and maintaining and improving statewide water management systems. The Water Plan promotes ways to develop a common approach for data standards and for understanding, evaluating, and improving regional and statewide water management systems, and for common ways to evaluate and select from alternative management strategies and projects. The California Water Plan acknowledges that planning for the future is uncertain and that change will continue to occur. It is not possible to know for certain how population growth, land use decisions, water demand patterns, environmental conditions, the climate, and many other factors that affect water use and supply may change by 2050. To anticipate change, our approach to water management and planning for the future needs to consider and quantify uncertainty, risk, and sustainability. There is a critical need for information sharing and information management to support over-arching and long-term water policy decisions that cross-cut multiple programs across many organizations and provide a common and transparent understanding of water problems and solutions. Achieving integrated water management with multiple benefits requires a transparent description of dynamic linkages between water supply, flood management, water quality, land use, environmental water, and many other factors. Water Plan Update 2013 will include an analytical roadmap for improving data, analytical tools, and decision-support to advance integrated water management at statewide and regional scales. It will include recommendations for linking collaborative processes with technical enhancements, providing effective analytical tools, and improving and sharing data and information. Specifically, this includes achieving better integration and consistency with other planning activities; obtaining consensus on quantitative deliverables; building a common conceptual understanding of the water management system; developing common schematics of the water management system; establishing modeling protocols and standards; and improving transparency and exchange of Water Plan information.

  2. A Blended Learning Approach to Teaching Project Management: A Model for Active Participation and Involvement--Insights from Norway

    ERIC Educational Resources Information Center

    Hussein, Bassam A.

    2015-01-01

    The paper demonstrates and evaluates the effectiveness of a blended learning approach to create a meaningful learning environment. We use the term blended learning approach in this paper to refer to the use of multiple or hybrid instructional methods that emphasize the role of learners as contributors to the learning process rather than recipients…

  3. The Italian National Forest Inventory: geographical and positioning aspects in relation to the different phases of the project

    Treesearch

    Giacomo Colle; Antonio Floris; Gianfranco Scrinzi; Giovanni Tabacchi; Lorenzo Cavini

    2009-01-01

    In this article, we describe in depth the analysis and solutions to manage the multiple coordinates of the sampling objects coming from the three different phases of the second Italian national forest inventory (Inventario Nazionale delle Foreste e dei serbatoi forestali di Carbonio [INFC]). In particular, this article describes the criteria used to determine the...

  4. Development of Medical Technology for Contingency Response to Marrow Toxic Agents

    DTIC Science & Technology

    2018-06-06

    Health Physics e. Emergency Medicine f. Burn Care g. State Public Health h. Federal Public Health i. Emergency Management. 2. The group has...Preparedness 4 Project: Local Public Health Radiological Preparedness Gap Review and Tool Development Identification 1. The National Association...of County and City Health Officials (NACCHO) has held multiple conference calls with leaders within their organization to identify the areas of

  5. Proceedings of a Symposium on the Kings River Sustainable Forest Ecosystem Project: Progress and Current Status

    Treesearch

    Jared Verner

    2002-01-01

    Ecosystem management aligns different uses of the land with ecological parameters and goals of environmental quality. An important USDA Forest Service mission is to balance the multiple uses of its lands in an ecologically sustainable way. This objective has been particularly challenging for National Forests of the Sierra Nevada in the face of heated controversies over...

  6. A Phenomenological Inquiry into the Perceptions of Software Professionals on the Asperger's Syndrome/High Functioning Autism Spectrum and the Success of Software Development Projects

    ERIC Educational Resources Information Center

    Kendall, Leslie R.

    2013-01-01

    Individuals who have Asperger's Syndrome/High-Functioning Autism, as a group, are chronically underemployed and underutilized. Many in this group have abilities that are well suited for various roles within the practice of software development. Multiple studies have shown that certain organizational and management changes in the software…

  7. Fast and Efficient Feature Engineering for Multi-Cohort Analysis of EHR Data.

    PubMed

    Ozery-Flato, Michal; Yanover, Chen; Gottlieb, Assaf; Weissbrod, Omer; Parush Shear-Yashuv, Naama; Goldschmidt, Yaara

    2017-01-01

    We present a framework for feature engineering, tailored for longitudinal structured data, such as electronic health records (EHRs). To fast-track feature engineering and extraction, the framework combines general-use plug-in extractors, a multi-cohort management mechanism, and modular memoization. Using this framework, we rapidly extracted thousands of features from diverse and large healthcare data sources in multiple projects.

  8. Air Traffic Management Technology Demonstration-1 Concept of Operations (ATD-1 ConOps), Version 2.0

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Johnson, William C.; Swenson, Harry N.; Robinson, John E.; Prevot, Tom; Callantine, Todd J.; Scardina, John; Greene, Michael

    2013-01-01

    This document is an update to the operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) integrates three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to the Final Approach Fix. These arrival streams are Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and their implantation into an operational environment. The ATD-1 goals include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  9. Modeling the Complex Impacts of Timber Harvests to Find Optimal Management Regimes for Amazon Tidal Floodplain Forests

    PubMed Central

    Fortini, Lucas B.; Cropper, Wendell P.; Zarin, Daniel J.

    2015-01-01

    At the Amazon estuary, the oldest logging frontier in the Amazon, no studies have comprehensively explored the potential long-term population and yield consequences of multiple timber harvests over time. Matrix population modeling is one way to simulate long-term impacts of tree harvests, but this approach has often ignored common impacts of tree harvests including incidental damage, changes in post-harvest demography, shifts in the distribution of merchantable trees, and shifts in stand composition. We designed a matrix-based forest management model that incorporates these harvest-related impacts so resulting simulations reflect forest stand dynamics under repeated timber harvests as well as the realities of local smallholder timber management systems. Using a wide range of values for management criteria (e.g., length of cutting cycle, minimum cut diameter), we projected the long-term population dynamics and yields of hundreds of timber management regimes in the Amazon estuary, where small-scale, unmechanized logging is an important economic activity. These results were then compared to find optimal stand-level and species-specific sustainable timber management (STM) regimes using a set of timber yield and population growth indicators. Prospects for STM in Amazonian tidal floodplain forests are better than for many other tropical forests. However, generally high stock recovery rates between harvests are due to the comparatively high projected mean annualized yields from fast-growing species that effectively counterbalance the projected yield declines from other species. For Amazonian tidal floodplain forests, national management guidelines provide neither the highest yields nor the highest sustained population growth for species under management. Our research shows that management guidelines specific to a region’s ecological settings can be further refined to consider differences in species demographic responses to repeated harvests. In principle, such fine-tuned management guidelines could make management more attractive, thus bridging the currently prevalent gap between tropical timber management practice and regulation. PMID:26322896

  10. Modeling the complex impacts of timber harvests to find optimal management regimes for Amazon tidal floodplain forests

    USGS Publications Warehouse

    Fortini, Lucas B.; Cropper, Wendell P.; Zarin, Daniel J.

    2015-01-01

    At the Amazon estuary, the oldest logging frontier in the Amazon, no studies have comprehensively explored the potential long-term population and yield consequences of multiple timber harvests over time. Matrix population modeling is one way to simulate long-term impacts of tree harvests, but this approach has often ignored common impacts of tree harvests including incidental damage, changes in post-harvest demography, shifts in the distribution of merchantable trees, and shifts in stand composition. We designed a matrix-based forest management model that incorporates these harvest-related impacts so resulting simulations reflect forest stand dynamics under repeated timber harvests as well as the realities of local smallholder timber management systems. Using a wide range of values for management criteria (e.g., length of cutting cycle, minimum cut diameter), we projected the long-term population dynamics and yields of hundreds of timber management regimes in the Amazon estuary, where small-scale, unmechanized logging is an important economic activity. These results were then compared to find optimal stand-level and species-specific sustainable timber management (STM) regimes using a set of timber yield and population growth indicators. Prospects for STM in Amazonian tidal floodplain forests are better than for many other tropical forests. However, generally high stock recovery rates between harvests are due to the comparatively high projected mean annualized yields from fast-growing species that effectively counterbalance the projected yield declines from other species. For Amazonian tidal floodplain forests, national management guidelines provide neither the highest yields nor the highest sustained population growth for species under management. Our research shows that management guidelines specific to a region’s ecological settings can be further refined to consider differences in species demographic responses to repeated harvests. In principle, such fine-tuned management guidelines could make management more attractive, thus bridging the currently prevalent gap between tropical timber management practice and regulation.

  11. Hybrid Cloud Computing Environment for EarthCube and Geoscience Community

    NASA Astrophysics Data System (ADS)

    Yang, C. P.; Qin, H.

    2016-12-01

    The NSF EarthCube Integration and Test Environment (ECITE) has built a hybrid cloud computing environment to provides cloud resources from private cloud environments by using cloud system software - OpenStack and Eucalyptus, and also manages public cloud - Amazon Web Service that allow resource synchronizing and bursting between private and public cloud. On ECITE hybrid cloud platform, EarthCube and geoscience community can deploy and manage the applications by using base virtual machine images or customized virtual machines, analyze big datasets by using virtual clusters, and real-time monitor the virtual resource usage on the cloud. Currently, a number of EarthCube projects have deployed or started migrating their projects to this platform, such as CHORDS, BCube, CINERGI, OntoSoft, and some other EarthCube building blocks. To accomplish the deployment or migration, administrator of ECITE hybrid cloud platform prepares the specific needs (e.g. images, port numbers, usable cloud capacity, etc.) of each project in advance base on the communications between ECITE and participant projects, and then the scientists or IT technicians in those projects launch one or multiple virtual machines, access the virtual machine(s) to set up computing environment if need be, and migrate their codes, documents or data without caring about the heterogeneity in structure and operations among different cloud platforms.

  12. The FIFE Project at Fermilab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Box, D.; Boyd, J.; Di Benedetto, V.

    2016-01-01

    The FabrIc for Frontier Experiments (FIFE) project is an initiative within the Fermilab Scientific Computing Division designed to steer the computing model for non-LHC Fermilab experiments across multiple physics areas. FIFE is a collaborative effort between experimenters and computing professionals to design and develop integrated computing models for experiments of varying size, needs, and infrastructure. The major focus of the FIFE project is the development, deployment, and integration of solutions for high throughput computing, data management, database access and collaboration management within an experiment. To accomplish this goal, FIFE has developed workflows that utilize Open Science Grid compute sites alongmore » with dedicated and commercial cloud resources. The FIFE project has made significant progress integrating into experiment computing operations several services including a common job submission service, software and reference data distribution through CVMFS repositories, flexible and robust data transfer clients, and access to opportunistic resources on the Open Science Grid. The progress with current experiments and plans for expansion with additional projects will be discussed. FIFE has taken the leading role in defining the computing model for Fermilab experiments, aided in the design of experiments beyond those hosted at Fermilab, and will continue to define the future direction of high throughput computing for future physics experiments worldwide.« less

  13. Genomes OnLine Database (GOLD) v.6: data updates and feature enhancements

    PubMed Central

    Mukherjee, Supratim; Stamatis, Dimitri; Bertsch, Jon; Ovchinnikova, Galina; Verezemska, Olena; Isbandi, Michelle; Thomas, Alex D.; Ali, Rida; Sharma, Kaushal; Kyrpides, Nikos C.; Reddy, T. B. K.

    2017-01-01

    The Genomes Online Database (GOLD) (https://gold.jgi.doe.gov) is a manually curated data management system that catalogs sequencing projects with associated metadata from around the world. In the current version of GOLD (v.6), all projects are organized based on a four level classification system in the form of a Study, Organism (for isolates) or Biosample (for environmental samples), Sequencing Project and Analysis Project. Currently, GOLD provides information for 26 117 Studies, 239 100 Organisms, 15 887 Biosamples, 97 212 Sequencing Projects and 78 579 Analysis Projects. These are integrated with over 312 metadata fields from which 58 are controlled vocabularies with 2067 terms. The web interface facilitates submission of a diverse range of Sequencing Projects (such as isolate genome, single-cell genome, metagenome, metatranscriptome) and complex Analysis Projects (such as genome from metagenome, or combined assembly from multiple Sequencing Projects). GOLD provides a seamless interface with the Integrated Microbial Genomes (IMG) system and supports and promotes the Genomic Standards Consortium (GSC) Minimum Information standards. This paper describes the data updates and additional features added during the last two years. PMID:27794040

  14. Catchment Models and Management Tools for diffuse Contaminants (Sediment, Phosphorus and Pesticides): DIFFUSE Project

    NASA Astrophysics Data System (ADS)

    Mockler, Eva; Reaney, Simeon; Mellander, Per-Erik; Wade, Andrew; Collins, Adrian; Arheimer, Berit; Bruen, Michael

    2017-04-01

    The agricultural sector is the most common suspected source of nutrient pollution in Irish rivers. However, it is also often the most difficult source to characterise due to its predominantly diffuse nature. Particulate phosphorus in surface water and dissolved phosphorus in groundwater are of particular concern in Irish water bodies. Hence the further development of models and indices to assess diffuse sources of contaminants are required for use by the Irish Environmental Protection Agency (EPA) to provide support for river basin planning. Understanding connectivity in the landscape is a vital component of characterising the source-pathway-receptor relationships for water-borne contaminants, and hence is a priority in this research. The DIFFUSE Project will focus on connectivity modelling and incorporation of connectivity into sediment, nutrient and pesticide risk mapping. The Irish approach to understanding and managing natural water bodies has developed substantially in recent years assisted by outputs from multiple research projects, including modelling and analysis tools developed during the Pathways and CatchmentTools projects. These include the Pollution Impact Potential (PIP) maps, which are an example of research output that is used by the EPA to support catchment management. The PIP maps integrate an understanding of the pollution pressures and mobilisation pathways and, using the source-pathways-receptor model, provide a scientific basis for evaluation of mitigation measures. These maps indicate the potential risk posed by nitrate and phosphate from diffuse agricultural sources to surface and groundwater receptors and delineate critical source areas (CSAs) as a means of facilitating the targeting of mitigation measures. Building on this previous research, the DIFFUSE Project will develop revised and new catchment managements tools focused on connectivity, sediment, phosphorus and pesticides. The DIFFUSE project will strive to identify the state-of-the-art methods and models that are most applicable to Irish conditions and management challenges. All styles of modelling considered useful for water resources management are relevant to this project and a balance of technical sophistication, data availability and operational practicalities is the ultimate goal. Achievement of this objective will be measured by comparing the performance of the new models developed in the project with models used in other countries. The models and tools developed in the course of the project will be evaluated by comparison with Irish catchment data and with other state-of-the-art models in a model-inter-comparison workshop which will be open to other models and the wider research community.

  15. The Human Toxome Collaboratorium: A Shared Environment for Multi-Omic Computational Collaboration within a Consortium.

    PubMed

    Fasani, Rick A; Livi, Carolina B; Choudhury, Dipanwita R; Kleensang, Andre; Bouhifd, Mounir; Pendse, Salil N; McMullen, Patrick D; Andersen, Melvin E; Hartung, Thomas; Rosenberg, Michael

    2015-01-01

    The Human Toxome Project is part of a long-term vision to modernize toxicity testing for the 21st century. In the initial phase of the project, a consortium of six academic, commercial, and government organizations has partnered to map pathways of toxicity, using endocrine disruption as a model hazard. Experimental data is generated at multiple sites, and analyzed using a range of computational tools. While effectively gathering, managing, and analyzing the data for high-content experiments is a challenge in its own right, doing so for a growing number of -omics technologies, with larger data sets, across multiple institutions complicates the process. Interestingly, one of the most difficult, ongoing challenges has been the computational collaboration between the geographically separate institutions. Existing solutions cannot handle the growing heterogeneous data, provide a computational environment for consistent analysis, accommodate different workflows, and adapt to the constantly evolving methods and goals of a research project. To meet the needs of the project, we have created and managed The Human Toxome Collaboratorium, a shared computational environment hosted on third-party cloud services. The Collaboratorium provides a familiar virtual desktop, with a mix of commercial, open-source, and custom-built applications. It shares some of the challenges of traditional information technology, but with unique and unexpected constraints that emerge from the cloud. Here we describe the problems we faced, the current architecture of the solution, an example of its use, the major lessons we learned, and the future potential of the concept. In particular, the Collaboratorium represents a novel distribution method that could increase the reproducibility and reusability of results from similar large, multi-omic studies.

  16. Scientist-Practitioner Engagement to Inform Regional Hydroclimate Model Evaluation

    NASA Astrophysics Data System (ADS)

    Jones, A. D.; Jagannathan, K. A.; Ullrich, P. A.

    2017-12-01

    Water mangers face significant challenges in planning for the coming decades as previously stationary aspects of the regional hydroclimate shift in response to global climate change. Providing scientific insights that enable appropriate use of regional hydroclimate projections for planning is a non-trivial problem. The system of data, models, and methods used to produce regional hydroclimate projections is subject to multiple interacting uncertainties and biases, including uncertainties that arise from general circulation models, re-analysis data products, regional climate models, hydrologic models, and statistical downscaling methods. Moreover, many components of this system were not designed with the information needs of water managers in mind. To address this problem and provide actionable insights into the sources of uncertainty present in regional hydroclimate data products, Project Hyperion has undertaken a stakeholder engagement process in four case study water basins across the US. Teams of water managers and scientists are interacting in a structured manner to identify decision-relevant metrics of model performance. These metrics are in turn being used to drive scientific investigations to uncover the sources of uncertainty in these quantities. Thus far, we have found that identification of climate phenomena of interest to stakeholders is relatively easy, but translating these into specific quantifiable metrics and prioritizing metrics is more challenging. Iterative feedback among scientists and stakeholders has proven critical in resolving these challenges, as has the roles played by boundary spanners who understand and can speak to the perspectives of multiple professional communities. Here we describe the structured format of our engagement process and the lessons learned so far, as we aim to improve the decision-relevance of hydroclimate projections through a collaborative process.

  17. Ecological requirements for pallid sturgeon reproduction and recruitment in the Lower Missouri River: Annual report 2009

    USGS Publications Warehouse

    DeLonay, Aaron J.; Jacobson, Robert B.; Papoulias, Diana M.; Wildhaber, Mark L.; Chojnacki, Kimberly A.; Pherigo, Emily K.; Bergthold, Casey L.; Mestl, Gerald E.

    2010-01-01

    The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The general Comprehensive Sturgeon Research Project strategy is to integrate field and laboratory studies of sturgeon reproductive ecology, habitat requirements, and physiology to produce a predictive understanding of sturgeon population dynamics. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery-Integrated Science Program. The research consists of several interdependent and complementary research tasks engaging multiple disciplines that primarily address spawning as a probable limiting factor in reproduction and survival of the pallid sturgeon. The research is multifaceted and is designed to provide information needed for management decisions impacting habitat restoration, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research activities and progress towards understanding of the species are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by Comprehensive Sturgeon Research Project during 2009.

  18. The invisible work of personal health information management among people with multiple chronic conditions: qualitative interview study among patients and providers.

    PubMed

    Ancker, Jessica S; Witteman, Holly O; Hafeez, Baria; Provencher, Thierry; Van de Graaf, Mary; Wei, Esther

    2015-06-04

    A critical problem for patients with chronic conditions who see multiple health care providers is incomplete or inaccurate information, which can contribute to lack of care coordination, low quality of care, and medical errors. As part of a larger project on applications of consumer health information technology (HIT) and barriers to its use, we conducted a semistructured interview study with patients with multiple chronic conditions (MCC) with the objective of exploring their role in managing their personal health information. Semistructured interviews were conducted with patients and providers. Patients were eligible if they had multiple chronic conditions and were in regular care with one of two medical organizations in New York City; health care providers were eligible if they had experience caring for patients with multiple chronic conditions. Analysis was conducted from a grounded theory perspective, and recruitment was concluded when saturation was achieved. A total of 22 patients and 7 providers were interviewed; patients had an average of 3.5 (SD 1.5) chronic conditions and reported having regular relationships with an average of 5 providers. Four major themes arose: (1) Responsibility for managing medical information: some patients perceived information management and sharing as the responsibility of health care providers; others—particularly those who had had bad experiences in the past—took primary responsibility for information sharing; (2) What information should be shared: although privacy concerns did influence some patients' perceptions of sharing of medical data, decisions about what to share were also heavily influenced by their understanding of health and disease and by the degree to which they understood the health care system; (3) Methods and tools varied: those patients who did take an active role in managing their records used a variety of electronic tools, paper tools, and memory; and (4) Information management as invisible work: managing transfers of medical information to solve problems was a tremendous amount of work that was largely unrecognized by the medical establishment. We conclude that personal health information management should be recognized as an additional burden that MCC places upon patients. Effective structural solutions for information sharing, whether institutional ones such as care management or technological ones such as electronic health information exchange, are likely not only to improve the quality of information shared but reduce the burden on patients already weighed down by MCC.

  19. Managing Analysis Models in the Design Process

    NASA Technical Reports Server (NTRS)

    Briggs, Clark

    2006-01-01

    Design of large, complex space systems depends on significant model-based support for exploration of the design space. Integrated models predict system performance in mission-relevant terms given design descriptions and multiple physics-based numerical models. Both the design activities and the modeling activities warrant explicit process definitions and active process management to protect the project from excessive risk. Software and systems engineering processes have been formalized and similar formal process activities are under development for design engineering and integrated modeling. JPL is establishing a modeling process to define development and application of such system-level models.

  20. Center for Plasma Edge Simulation (CPES) -- Rutgers University Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parashar, Manish

    2014-03-06

    The CPES scientific simulations run at scale on leadership class machines, collaborate at runtime and produce and exchange large data sizes, which present multiple I/O and data management challenges. During the CPES project, the Rutgers team worked with the rest of the CPES team to address these challenges at different levels, and specifically (1) at the data transport and communication level through the DART (Decoupled and Asynchronous Remote Data Transfers) framework, and (2) at the data management and services level through the DataSpaces and ActiveSpaces frameworks. These frameworks and their impact are briefly described.

  1. Integrated watershed planning across jurisdictional boundaries

    NASA Astrophysics Data System (ADS)

    Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.

    2014-12-01

    We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.

  2. Projecting future expansion of invasive species: comparing and improving methodologies for species distribution modeling.

    PubMed

    Mainali, Kumar P; Warren, Dan L; Dhileepan, Kunjithapatham; McConnachie, Andrew; Strathie, Lorraine; Hassan, Gul; Karki, Debendra; Shrestha, Bharat B; Parmesan, Camille

    2015-12-01

    Modeling the distributions of species, especially of invasive species in non-native ranges, involves multiple challenges. Here, we developed some novel approaches to species distribution modeling aimed at reducing the influences of such challenges and improving the realism of projections. We estimated species-environment relationships for Parthenium hysterophorus L. (Asteraceae) with four modeling methods run with multiple scenarios of (i) sources of occurrences and geographically isolated background ranges for absences, (ii) approaches to drawing background (absence) points, and (iii) alternate sets of predictor variables. We further tested various quantitative metrics of model evaluation against biological insight. Model projections were very sensitive to the choice of training dataset. Model accuracy was much improved using a global dataset for model training, rather than restricting data input to the species' native range. AUC score was a poor metric for model evaluation and, if used alone, was not a useful criterion for assessing model performance. Projections away from the sampled space (i.e., into areas of potential future invasion) were very different depending on the modeling methods used, raising questions about the reliability of ensemble projections. Generalized linear models gave very unrealistic projections far away from the training region. Models that efficiently fit the dominant pattern, but exclude highly local patterns in the dataset and capture interactions as they appear in data (e.g., boosted regression trees), improved generalization of the models. Biological knowledge of the species and its distribution was important in refining choices about the best set of projections. A post hoc test conducted on a new Parthenium dataset from Nepal validated excellent predictive performance of our 'best' model. We showed that vast stretches of currently uninvaded geographic areas on multiple continents harbor highly suitable habitats for parthenium. However, discrepancies between model predictions and parthenium invasion in Australia indicate successful management for this globally significant weed. © 2015 John Wiley & Sons Ltd.

  3. Negotiating designs of multi-purpose reservoir systems in international basins

    NASA Astrophysics Data System (ADS)

    Geressu, Robel; Harou, Julien

    2016-04-01

    Given increasing agricultural and energy demands, coordinated management of multi-reservoir systems could help increase production without further stressing available water resources. However, regional or international disputes about water-use rights pose a challenge to efficient expansion and management of many large reservoir systems. Even when projects are likely to benefit all stakeholders, agreeing on the design, operation, financing, and benefit sharing can be challenging. This is due to the difficulty of considering multiple stakeholder interests in the design of projects and understanding the benefit trade-offs that designs imply. Incommensurate performance metrics, incomplete knowledge on system requirements, lack of objectivity in managing conflict and difficulty to communicate complex issue exacerbate the problem. This work proposes a multi-step hybrid multi-objective optimization and multi-criteria ranking approach for supporting negotiation in water resource systems. The approach uses many-objective optimization to generate alternative efficient designs and reveal the trade-offs between conflicting objectives. This enables informed elicitation of criteria weights for further multi-criteria ranking of alternatives. An ideal design would be ranked as best by all stakeholders. Resource-sharing mechanisms such as power-trade and/or cost sharing may help competing stakeholders arrive at designs acceptable to all. Many-objective optimization helps suggests efficient designs (reservoir site, its storage size and operating rule) and coordination levels considering the perspectives of multiple stakeholders simultaneously. We apply the proposed approach to a proof-of-concept study of the expansion of the Blue Nile transboundary reservoir system.

  4. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  5. Configuration Management at NASA

    NASA Technical Reports Server (NTRS)

    Doreswamy, Rajiv

    2013-01-01

    NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

  6. Developing Quality Improvement capacity and capability across the Children in Fife partnership.

    PubMed

    Morris, Craig; Alexander, Ingrid

    2016-01-01

    A Project Manager from the Fife Early Years Collaborative facilitated a large-scale Quality Improvement (herein QI) project to build organisational capacity and capability across the Children in Fife partnership through three separate, eight month training cohorts. This 18 month QI project enabled 32 practitioners to increase their skills, knowledge, and experiences in a variety of QI tools including the Model for Improvement which then supported the delivery of high quality improvement projects and improved outcomes for children and families. Essentially growing the confidence and capability of practitioners to deliver sustainable QI. 27 respective improvement projects were delivered, some leading to service redesign, reduced waiting times, increased uptake of health entitlements, and improved accessibility to front-line health services. 13 improvement projects spread or scaled beyond the initial site and informal QI mentoring took place with peers in respective agencies. Multiple PDSA cycles were conducted testing the most efficient and effective support mechanisms during and post training, maintaining regular contact, and utilising social media to share progress and achievements.

  7. Climate Change and Interacting Stressors: Implications for ...

    EPA Pesticide Factsheets

    EPA announced the release of the final document, Climate Change and Interacting Stressors: Implications for Coral Reef Management in American Samoa. This report provides a synthesis of information on the interactive effects of climate change and other stressors on the reefs of American Samoa as well as an assessment of potential management responses. This report provides the coral reef managers of American Samoa, as well as other coral reef managers in the Pacific region, with some management options to help enhance the capacity of local coral reefs to resist the negative effects of climate change. This report was designed to take advantage of diverse research and monitoring efforts that are ongoing in American Samoa to: analyze and compile the results of multiple research projects that focus on understanding climate-related stressors and their effects on coral reef ecosystem degradation and recovery; and assess implications for coral reef managment of the combined information, including possible response options.

  8. The role of Indigenous knowledge in environmental health risk management in Yukon, Canada

    PubMed Central

    Friendship, Katelyn A.; Furgal, Chris M.

    2012-01-01

    Objectives This project aimed to gain better understandings of northern Indigenous risk perception related to food safety and to identify the role that Indigenous knowledge (IK) plays in risk management processes to support more effective and culturally relevant benefit-risk (B-R) management strategies. Study design The project used an exploratory qualitative case study design to investigate the role and place of IK in the management of environmental contaminants exposure via consumption of traditional foods in Yukon First Nations (YFNs). Methods Forty-one semi-directive interviews with Traditional Food Knowledge Holders and Health and Environment Decision-makers were conducted. A review and analysis of organizational documents related to past risk management events for the issue was conducted. Thematic content analysis was used to analyze transcripts and documents for key themes related to the research question. Results There was a recognized need by all participants for better collaboration between scientists and YFN communities. YFNs have been involved in identifying and defining community concerns about past risk issues, setting a local context, and participating in communications strategies. Interviewees stressed the need to commit adequate time for building relationships, physically being in the community, and facilitating open communication. Conducting community-based projects was identified as critical for collaboration and for cooperative learning and management of these issues. Conclusions The perception of “effective” benefit-risk management is significantly influenced by the efforts made to include local communities in the process. A set of common guiding principles within a process that brings together people and knowledge systems may provide a more effective way forward in cross-cultural, multiple knowledge system contexts for complex benefit-risk issues than a prescriptive rigid framework. PMID:22868192

  9. The Saskatchewan River Basin - a large scale observatory for water security research (Invited)

    NASA Astrophysics Data System (ADS)

    Wheater, H. S.

    2013-12-01

    The 336,000 km2 Saskatchewan River Basin (SaskRB) in Western Canada illustrates many of the issues of Water Security faced world-wide. It poses globally-important science challenges due to the diversity in its hydro-climate and ecological zones. With one of the world's more extreme climates, it embodies environments of global significance, including the Rocky Mountains (source of the major rivers in Western Canada), the Boreal Forest (representing 30% of Canada's land area) and the Prairies (home to 80% of Canada's agriculture). Management concerns include: provision of water resources to more than three million inhabitants, including indigenous communities; balancing competing needs for water between different uses, such as urban centres, industry, agriculture, hydropower and environmental flows; issues of water allocation between upstream and downstream users in the three prairie provinces; managing the risks of flood and droughts; and assessing water quality impacts of discharges from major cities and intensive agricultural production. Superimposed on these issues is the need to understand and manage uncertain water futures, including effects of economic growth and environmental change, in a highly fragmented water governance environment. Key science questions focus on understanding and predicting the effects of land and water management and environmental change on water quantity and quality. To address the science challenges, observational data are necessary across multiple scales. This requires focussed research at intensively monitored sites and small watersheds to improve process understanding and fine-scale models. To understand large-scale effects on river flows and quality, land-atmosphere feedbacks, and regional climate, integrated monitoring, modelling and analysis is needed at large basin scale. And to support water management, new tools are needed for operational management and scenario-based planning that can be implemented across multiple scales and multiple jurisdictions. The SaskRB has therefore been developed as a large scale observatory, now a Regional Hydroclimate Project of the World Climate Research Programme's GEWEX project, and is available to contribute to the emerging North American Water Program. State-of-the-art hydro-ecological experimental sites have been developed for the key biomes, and a river and lake biogeochemical research facility, focussed on impacts of nutrients and exotic chemicals. Data are integrated at SaskRB scale to support the development of improved large scale climate and hydrological modelling products, the development of DSS systems for local, provincial and basin-scale management, and the development of related social science research, engaging stakeholders in the research and exploring their values and priorities for water security. The observatory provides multiple scales of observation and modelling required to develop: a) new climate, hydrological and ecological science and modelling tools to address environmental change in key environments, and their integrated effects and feedbacks at large catchment scale, b) new tools needed to support river basin management under uncertainty, including anthropogenic controls on land and water management and c) the place-based focus for the development of new transdisciplinary science.

  10. Photography in Telemedicine: Improving Diagnosis of Chronic Graft-Versus-Host Disease.

    PubMed

    Busby, Brianna; Campbell, Shannon; Cole, Rachel; DeVries, Charisse; Dobbins, Kamille; Trimble, Mary Beth; Wickline, Mihkaila

    2017-02-01

    The long-term follow-up (LTFU) team at the Seattle Cancer Care Alliance uses telemedicine to diagnose and treat post-transplantation complications in hematopoietic cell transplantation (HCT) survivors. Photos are often requested via the telemedicine service to aid in diagnosis, but they are typically of poor quality, making them unusable. This project offered bachelor of science in nursing students, partnered with a comprehensive cancer center, the opportunity to participate in an evidence-based practice project to improve detection and management of chronic graft-versus-host disease (cGVHD) in patients after HCT. Students partnered with RNs to develop instructional tools using multiple evidence sources. A brochure and video were developed. Providing these instructional tools to those in the LTFU program improved patient outcomes for managing cGVHD through telemedicine. This partnership provided an opportunity for mutual learning and improved clinical practice.

  11. The Opportunities and Challenges of the State-owned Exploration Companies Confronting the Prosperous Mineral Industry

    NASA Astrophysics Data System (ADS)

    Gao, Bangfei; Xie, Hui

    The stated-owned exploration companies (SOEC), of state-owned enterprises background, go for profits as well as national and social responsibility. The SOEC play significant roles in commercial mineral exploration by taking advantage of their brands, strong financial backing and operation capability to integrate the capital and technology. Since the disadvantage of backwardness, the SOEC have to deal with multiple problems, such as high costs of mineral rights acquisition, multi-cooperation project management, and the criterions for traditional techniques can not adapt the rapid commercial mineral exploration and evaluation. Under the new situation, the SOEC should be careful to make investment decisions, strengthen project management, introduce venture capital funds, and cooperate with the government and the state-owned exploration institution (SOEI). It's suggested to carry out small-scale assembled explorations to reduce the exploration risks and costs, and to increase the exploration success rate.

  12. A Decision Model for Supporting Task Allocation Processes in Global Software Development

    NASA Astrophysics Data System (ADS)

    Lamersdorf, Ansgar; Münch, Jürgen; Rombach, Dieter

    Today, software-intensive systems are increasingly being developed in a globally distributed way. However, besides its benefit, global development also bears a set of risks and problems. One critical factor for successful project management of distributed software development is the allocation of tasks to sites, as this is assumed to have a major influence on the benefits and risks. We introduce a model that aims at improving management processes in globally distributed projects by giving decision support for task allocation that systematically regards multiple criteria. The criteria and causal relationships were identified in a literature study and refined in a qualitative interview study. The model uses existing approaches from distributed systems and statistical modeling. The article gives an overview of the problem and related work, introduces the empirical and theoretical foundations of the model, and shows the use of the model in an example scenario.

  13. The Childhood Obesity Research Demonstration project: a team approach for supporting a multisite, multisector intervention.

    PubMed

    Williams, Nancy; Dooyema, Carrie A; Foltz, Jennifer L; Belay, Brook; Blanck, Heidi M

    2015-02-01

    Comprehensive multisector, multilevel approaches are needed to address childhood obesity. This article introduces the structure of a multidisciplinary team approach used to support and guide the multisite, multisector interventions implemented as part of the Childhood Obesity Research Demonstration (CORD) project. This article will describe the function, roles, and lessons learned from the CDC-CORD approach to project management. The CORD project works across multisectors and multilevels in three demonstration communities. Working with principal investigators and their research teams who are engaging multiple stakeholder groups, including community organizations, schools and child care centers, health departments, and healthcare providers, can be a complex endeavor. To best support the community-based research project, scientific and programmatic expertise in a wide range of areas was required. The team was configured based on the skill sets needed to interact with the various levels of staff working with the project. By thoughtful development of the team and processes, an efficient system for supporting the multisite, multisector intervention project sites was developed. The team approach will be formally evaluated at the end of the project period.

  14. A comprehensive grid to evaluate case management's expected effectiveness for community-dwelling frail older people: results from a multiple, embedded case study.

    PubMed

    Van Durme, Thérèse; Schmitz, Olivier; Cès, Sophie; Anthierens, Sibyl; Maggi, Patrick; Delye, Sam; De Almeida Mello, Johanna; Declercq, Anja; Macq, Jean; Remmen, Roy; Aujoulat, Isabelle

    2015-06-18

    Case management is a type of intervention expected to improve the quality of care and therefore the quality of life of frail, community-dwelling older people while delaying institutionalisation in nursing homes. However, the heterogeneity, multidimensionality and complexity of these interventions make their evaluation by the means of classical approaches inadequate. Our objective was twofold: (i) to propose a tool allowing for the identification of the key components that explain the success of case management for this population and (ii) to propose a typology based on the results of this tool. The process started with a multiple embedded case study design in order to identify the key components of case management. Based on the results of this first step, data were collected among 22 case management interventions, in order to evaluate their expected effectiveness. Finally, multiple correspondence analyses was conducted to propose a typology of case management. The overall approach was informed by Wagner's Chronic Care Model and the theory of complexity. The study identified a total of 23 interacting key components. Based on the clustering of response patterns of the 22 case management projects included in our study, three types of case management programmes were evidenced, situated on a continuum from a more "socially-oriented" type towards a more "clinically-oriented" type of case management. The type of feedback provided to the general practitioner about both the global geriatric assessment and the result of the intervention turned out to be the most discriminant component between the types. The study design allowed to produce a tool that can be used to distinguish between different types of case management interventions and further evaluate their effect on frail older people in terms of the delaying institutionalisation, functional and cognitive status, quality of life and societal costs.

  15. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  16. Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX

    DTIC Science & Technology

    2013-02-06

    Table 5 5 Stormwater Concrete Removal 6 Area Disturbed (acres) Average Removal Depth (ft) Concrete Density (lb/ft 3 ) Concrete Removed (lb...600 feet to the north; and, • Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Construction would include site...of exposed soils from stormwater runoff, best management practices (BMPs) would be implemented during construction and demolition (C&D). These

  17. Organizational principles of cloud storage to support collaborative biomedical research.

    PubMed

    Kanbar, Lara J; Shalish, Wissam; Robles-Rubio, Carlos A; Precup, Doina; Brown, Karen; Sant'Anna, Guilherme M; Kearney, Robert E

    2015-08-01

    This paper describes organizational guidelines and an anonymization protocol for the management of sensitive information in interdisciplinary, multi-institutional studies with multiple collaborators. This protocol is flexible, automated, and suitable for use in cloud-based projects as well as for publication of supplementary information in journal papers. A sample implementation of the anonymization protocol is illustrated for an ongoing study dealing with Automated Prediction of EXtubation readiness (APEX).

  18. An Examination of the Perceived Importance of Technical Competence in Acquisition Project Management

    DTIC Science & Technology

    1991-09-01

    Develop (First Draft) Instructions Critique (Revision) Answerability Pilot Test (Second Draft) Analysis Response Mode Revision Useability Preparation...appropriate questionnaire items. Initially, the set of questions developed for the study reflected a few shortcomings. A pilot test of the first draft among...resulted. First, feedback from the pilot test indicated a need to reduce the completion time. Because the multiple choice format required several

  19. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  20. Methodology Development for Assessment of Spaceport Technology Returns and Risks

    NASA Technical Reports Server (NTRS)

    Joglekar, Prafulla; Zapata, Edgar

    2001-01-01

    As part of Kennedy Space Center's (KSC's) challenge to open the space frontier, new spaceport technologies must be developed, matured and successfully transitioned to operational systems. R&D investment decisions can be considered from multiple perspectives. Near mid and far term technology horizons must be understood. Because a multitude of technology investment opportunities are available, we must identify choices that promise the greatest likelihood of significant lifecycle At the same time, the costs and risks of any choice must be well understood and balanced against its potential returns The problem is not one of simply rank- ordering projects in terms of their desirability. KSC wants to determine a portfolio of projects that simultaneously satisfies multiple goals, such as getting the biggest bang for the buck, supporting projects that may be too risky for private funding, staying within annual budget cycles without foregoing the requirements of a long term technology vision, and ensuring the development of a diversity of technologies that, support the variety of operational functions involved in space transportation. This work aims to assist in the development of in methods and techniques that support strategic technology investment decisions and ease the process of determining an optimal portfolio of spaceport R&D investments. Available literature on risks and returns to R&D is reviewed and most useful pieces are brought to the attention of the Spaceport Technology Development Office (STDO). KSC's current project management procedures are reviewed. It is found that the "one size fits all" nature of KSC's existing procedures and project selection criteria is not conducive to prudent decision-making. Directions for improving KSC's - procedures and criteria are outlined. With help of a contractor, STDO is currently developing a tool, named Change Management Analysis Tool (CMAT)/ Portfolio Analysis Tool (PAT), to assist KSC's R&D portfolio determination. A critical review of CMAT/PAT is undertaken. Directions for the improvement of this tool are provided. STDO and KSC intend to follow up on many, if not all, of the recommendations provided.

  1. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  2. An update on MS Nurse PROfessional, an ongoing project of the European Multiple Sclerosis Platform.

    PubMed

    Winslow, Anne

    2016-12-01

    Within the multidisciplinary team required to manage people with multiple sclerosis (MS) effectively, the nurse is the central component of coordinated care and support. A 2009 survey led by the European Multiple Sclerosis Platform, an umbrella organization of national MS associations, identified variance and disparity across Europe in the nursing care of MS patients. This led to development of MS Nurse PROfessional, a continuing medical education-accredited modular online learning program endorsed and approved by leading international nursing and professional groups, and people with MS, as a tool to support the evolving role of the European MS nurse. Analysis of participant experience and nurse practice to date has been overwhelmingly positive. Expansion of MS Nurse PRO is underway or planned for future.

  3. NASA's ATM Technology Demonstration-1: Integrated Concept of Arrival Operations

    NASA Technical Reports Server (NTRS)

    Baxley, Brian T.; Swenson, Harry N.; Prevot, Thomas; Callantine, Todd J.

    2012-01-01

    This paper describes operations and procedures envisioned for NASA s Air Traffic Management (ATM) Technology Demonstration #1 (ATD-1). The ATD-1 Concept of Operations (ConOps) demonstration will integrate three NASA technologies to achieve high throughput, fuel-efficient arrival operations into busy terminal airspace. They are Traffic Management Advisor with Terminal Metering (TMA-TM) for precise time-based schedules to the runway and points within the terminal area, Controller-Managed Spacing (CMS) decision support tools for terminal controllers to better manage aircraft delay using speed control, and Flight deck Interval Management (FIM) avionics and flight crew procedures to conduct airborne spacing operations. The ATD-1 concept provides de-conflicted and efficient operations of multiple arrival streams of aircraft, passing through multiple merge points, from top-of-descent (TOD) to touchdown. It also enables aircraft to conduct Optimized Profile Descents (OPDs) from en route altitude to the runway, using primarily speed control to maintain separation and schedule. The ATD-1 project is currently addressing the challenges of integrating the three technologies, and implantation into an operational environment. Goals of the ATD-1 demonstration include increasing the throughput of high-density airports, reducing controller workload, increasing efficiency of arrival operations and the frequency of trajectory-based operations, and promoting aircraft ADS-B equipage.

  4. Reducing Lake Erie's Harmful Algal Blooms: Projection and Adoption of Management Plans

    NASA Astrophysics Data System (ADS)

    Martin, J.; Aloysius, N.; Howard, G.; Kalcic, M. M.; Wilson, R. S.; Scavia, D.; Roe, B.

    2016-12-01

    In early 2016, the United States and Canada formally agreed to reduce phosphorus inputs to Lake Erie by 40% to reduce the severity of annual Harmful Algal Blooms (HABs). These blooms have become more severe, with record events occurring in 2011 and 2015, and have compromised public safety, shut down drinking water supplies, and negatively impacted the economy of the western Lake Erie basin. Now, key questions revolve around the ability to reach the 40% reduction, required management changes, and resources to support these changes. This presentation will highlight interdisciplinary research to compare the amount and types of practices needed for this reduction to the current and projected levels of adoption. Economic resources to support these management changes are also compared with the financial support from the general public to improve Lake Erie water quality. Multiple models of the Maumee watershed identified management plans and adoption rates needed to reach the reduction targets. For example, one successful scenario estimated necessary adoption rates of 50% for subsurface application of fertilizer on row crops, 58% for cover crops, and 78% for buffer strips. Current adoption is below these levels, but future projections based on farmer surveys shows these levels are possible. Public support is necessary to generate the funding to support cost sharing and other programs aimed at increasing adoption of recommended practices. Comparing results from willingness-to-pay surveys of the general public with the estimated need for these management plans shows a gap in resources to support these levels of adoption. In general, these results show that accelerated adoption of management plans is needed compared to past adoption rates, but that these rates are possible based on likely adoption rates. Projected support from the general public indicates it will be challenging to fund these rates of adoption, especially during climate changes that may require even greater adoption. To partially address this challenge, accelerated rates of adoption may be achieved through voluntary means by increasing the perceived efficacy of the practices.

  5. An assessment of adherence to basic ecological principles by payments for ecosystem service projects.

    PubMed

    Prager, C M; Varga, A; Olmsted, P; Ingram, J C; Cattau, M; Freund, C; Wynn-Grant, R; Naeem, S

    2016-08-01

    Programs and projects employing payments for ecosystem service (PES) interventions achieve their objectives by linking buyers and sellers of ecosystem services. Although PES projects are popular conservation and development interventions, little is known about their adherence to basic ecological principles. We conducted a quantitative assessment of the degree to which a global set of PES projects adhered to four ecological principles that are basic scientific considerations for any project focused on ecosystem management: collection of baseline data, identification of threats to an ecosystem service, monitoring, and attention to ecosystem dynamics or the formation of an adaptive management plan. We evaluated 118 PES projects in three markets-biodiversity, carbon, and water-compiled using websites of major conservation organizations; ecology, economic, and climate-change databases; and three scholarly databases (ISI Web of Knowledge, Web of Science, and Google Scholar). To assess adherence to ecological principles, we constructed two scientific indices (one additive [ASI] and one multiplicative [MSI]) based on our four ecological criteria and analyzed index scores by relevant project characteristics (e.g., sector, buyer, seller). Carbon-sector projects had higher ASI values (P < 0.05) than water-sector projects and marginally higher ASI scores (P < 0.1) than biodiversity-sector projects, demonstrating their greater adherence to ecological principles. Projects financed by public-private partnerships had significantly higher ASI values than projects financed by governments (P < 0.05) and marginally higher ASI values than those funded by private entities (P < 0.1). We did not detect differences in adherence to ecological principles based on the inclusion of cobenefits, the spatial extent of a project, or the size of a project's budget. These findings suggest, at this critical phase in the rapid growth of PES projects, that fundamental ecological principles should be considered more carefully in PES project design and implementation in an effort to ensure PES project viability and sustainability. © 2015 Society for Conservation Biology.

  6. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  7. Experiential learning in control systems laboratories and engineering project management

    NASA Astrophysics Data System (ADS)

    Reck, Rebecca Marie

    Experiential learning is a process by which a student creates knowledge through the insights gained from an experience. Kolb's model of experiential learning is a cycle of four modes: (1) concrete experience, (2) reflective observation, (3) abstract conceptualization, and (4) active experimentation. His model is used in each of the three studies presented in this dissertation. Laboratories are a popular way to apply the experiential learning modes in STEM courses. Laboratory kits allow students to take home laboratory equipment to complete experiments on their own time. Although students like laboratory kits, no previous studies compared student learning outcomes on assignments using laboratory kits with existing laboratory equipment. In this study, we examined the similarities and differences between the experiences of students who used a portable laboratory kit and students who used the traditional equipment. During the 2014- 2015 academic year, we conducted a quasi-experiment to compare students' achievement of learning outcomes and their experiences in the instructional laboratory for an introductory control systems course. Half of the laboratory sections in each semester used the existing equipment, while the other sections used a new kit. We collected both quantitative data and qualitative data. We did not identify any major differences in the student experience based on the equipment they used. Course objectives, like research objectives and product requirements, help provide clarity and direction for faculty and students. Unfortunately, course and laboratory objectives are not always clearly stated. Without a clear set of objectives, it can be hard to design a learning experience and determine whether students are achieving the intended outcomes of the course or laboratory. In this study, I identified a common set of laboratory objectives, concepts, and components of a laboratory apparatus for undergraduate control systems laboratories. During the summer of 2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects course. Two students from the project management course function as project managers and lead a team of undergraduate students in the second course through a project. I studied how closely the project management experience in these courses aligns with engineering project management in industry. In the spring of 2015, I enrolled in the project management course at a large Midwestern university. I used analytic autoethnography to compare my experiences in the course with my experiences as a project engineer at a large aerospace company. I found that the experience in the course provided an authentic and comprehensive opportunity to practice most of the skills listed in the Project Management Book of Knowledge (an industry standard) as necessary for project managers. Some components of the course that made it successful: I was the project manager for the whole term, I worked with a real client, and the team defined and delivered the project before the end of the semester.

  8. Climate change and watershed mercury export: a multiple projection and model analysis

    USGS Publications Warehouse

    Golden, Heather E.; Knightes, Christopher D.; Conrads, Paul; Feaster, Toby D.; Davis, Gary M.; Benedict, Stephen T.; Bradley, Paul M.

    2013-01-01

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. An ensemble of watershed models was applied in the present study to simulate and evaluate the responses of hydrological and total Hg (THg) fluxes from the landscape to the watershed outlet and in-stream THg concentrations to contrasting climate change projections for a watershed in the southeastern coastal plain of the United States. Simulations were conducted under stationary atmospheric deposition and land cover conditions to explicitly evaluate the effect of projected precipitation and temperature on watershed Hg export (i.e., the flux of Hg at the watershed outlet). Based on downscaled inputs from 2 global circulation models that capture extremes of projected wet (Community Climate System Model, Ver 3 [CCSM3]) and dry (ECHAM4/HOPE-G [ECHO]) conditions for this region, watershed model simulation results suggest a decrease of approximately 19% in ensemble-averaged mean annual watershed THg fluxes using the ECHO climate-change model and an increase of approximately 5% in THg fluxes with the CCSM3 model. Ensemble-averaged mean annual ECHO in-stream THg concentrations increased 20%, while those of CCSM3 decreased by 9% between the baseline and projected simulation periods. Watershed model simulation results using both climate change models suggest that monthly watershed THg fluxes increase during the summer, when projected flow is higher than baseline conditions. The present study's multiple watershed model approach underscores the uncertainty associated with climate change response projections and their use in climate change management decisions. Thus, single-model predictions can be misleading, particularly in developmental stages of watershed Hg modeling.

  9. Analyzing compound and project progress through multi-objective-based compound quality assessment.

    PubMed

    Nissink, J Willem M; Degorce, Sébastien

    2013-05-01

    Compound-quality scoring methods designed to evaluate multiple drug properties concurrently are useful to analyze and prioritize output from drug-design efforts. However, formalized multiparameter optimization approaches are not widely used in drug design. We rank molecules synthesized in drug-discovery projects using simple and aggregated desirability functions reflecting medicinal chemistry 'rules'. Our quality score deals transparently with missing data, a key requirement in drug-hunting projects where data availability is often limited. We further estimate confidence in the interpretation of such a compound-quality measure. Scores and associated confidences provide systematic insight in the quality of emerging chemical equity. Tracking quality of synthetic output over time yields valuable insight into the progress of drug-design teams, with potential applications in risk and resource management of a drug portfolio.

  10. Screensaver: an open source lab information management system (LIMS) for high throughput screening facilities

    PubMed Central

    2010-01-01

    Background Shared-usage high throughput screening (HTS) facilities are becoming more common in academe as large-scale small molecule and genome-scale RNAi screening strategies are adopted for basic research purposes. These shared facilities require a unique informatics infrastructure that must not only provide access to and analysis of screening data, but must also manage the administrative and technical challenges associated with conducting numerous, interleaved screening efforts run by multiple independent research groups. Results We have developed Screensaver, a free, open source, web-based lab information management system (LIMS), to address the informatics needs of our small molecule and RNAi screening facility. Screensaver supports the storage and comparison of screening data sets, as well as the management of information about screens, screeners, libraries, and laboratory work requests. To our knowledge, Screensaver is one of the first applications to support the storage and analysis of data from both genome-scale RNAi screening projects and small molecule screening projects. Conclusions The informatics and administrative needs of an HTS facility may be best managed by a single, integrated, web-accessible application such as Screensaver. Screensaver has proven useful in meeting the requirements of the ICCB-Longwood/NSRB Screening Facility at Harvard Medical School, and has provided similar benefits to other HTS facilities. PMID:20482787

  11. Small steps to health: building sustainable partnerships in pediatric obesity care.

    PubMed

    Pomietto, Mo; Docter, Alicia Dixon; Van Borkulo, Nicole; Alfonsi, Lorrie; Krieger, James; Liu, Lenna L

    2009-06-01

    Given the prevalence of childhood obesity and the limited support for preventing and managing obesity in primary care settings, the Seattle Children's Hospital's Children's Obesity Action Team has partnered with Steps to Health King County to develop a pediatric obesity quality-improvement project. Primary care clinics joined year-long quality-improvement collaboratives to integrate obesity prevention and management into the clinic setting by using the chronic-disease model. Sustainability was enhanced through integration at multiple levels by emphasizing small, consistent behavior changes and self-regulation of eating/feeding practices with children, teenagers, and families; building local community partnerships; and encouraging broader advocacy and policy change. Cultural competency and attention to disparities were integrated into quality-improvement efforts. . Participating clinics were able to increase BMI measurement and weight classification; integrate management of overweight/obese children and family and self-management support; and grow community collaborations. Over the course of 4 years, this project grew from a local effort involving 3 clinics to a statewide program recently adopted by the Washington State Department of Health. This model can be used by other states/regions to develop pediatric obesity quality-improvement programs to support the assessment, prevention, and management of childhood obesity. Furthermore, these health care efforts can be integrated into broader community-wide childhood-obesity action plans.

  12. Screensaver: an open source lab information management system (LIMS) for high throughput screening facilities.

    PubMed

    Tolopko, Andrew N; Sullivan, John P; Erickson, Sean D; Wrobel, David; Chiang, Su L; Rudnicki, Katrina; Rudnicki, Stewart; Nale, Jennifer; Selfors, Laura M; Greenhouse, Dara; Muhlich, Jeremy L; Shamu, Caroline E

    2010-05-18

    Shared-usage high throughput screening (HTS) facilities are becoming more common in academe as large-scale small molecule and genome-scale RNAi screening strategies are adopted for basic research purposes. These shared facilities require a unique informatics infrastructure that must not only provide access to and analysis of screening data, but must also manage the administrative and technical challenges associated with conducting numerous, interleaved screening efforts run by multiple independent research groups. We have developed Screensaver, a free, open source, web-based lab information management system (LIMS), to address the informatics needs of our small molecule and RNAi screening facility. Screensaver supports the storage and comparison of screening data sets, as well as the management of information about screens, screeners, libraries, and laboratory work requests. To our knowledge, Screensaver is one of the first applications to support the storage and analysis of data from both genome-scale RNAi screening projects and small molecule screening projects. The informatics and administrative needs of an HTS facility may be best managed by a single, integrated, web-accessible application such as Screensaver. Screensaver has proven useful in meeting the requirements of the ICCB-Longwood/NSRB Screening Facility at Harvard Medical School, and has provided similar benefits to other HTS facilities.

  13. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    NASA Technical Reports Server (NTRS)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  14. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  15. Self-presentational persona: simultaneous management of multiple impressions.

    PubMed

    Leary, Mark R; Allen, Ashley Batts

    2011-11-01

    Most research on self-presentation has examined how people convey images of themselves on only 1 or 2 dimensions at a time. In everyday interactions, however, people often manage their impressions on several image-relevant dimensions simultaneously. By examining people's self-presentations to several targets across multiple dimensions, these 2 studies offer new insights into the nature of self-presentation and provide a novel paradigm for studying impression management. Results showed that most people rely on a relatively small number of basic self-presentational personas in which they convey particular profiles of impressions as a set and that these personas reflect both normative influences to project images that are appropriate to a particular target and distinctive influences by which people put an idiosyncratic spin on these normative images. Furthermore, although people's self-presentational profiles correlate moderately with their self-views, they tailor their public images to specific targets. The degree to which participants' self-presentations were normative and distinctive, as well as the extent to which they reflected their own self-views, were moderated by individual differences in agreeableness, self-esteem, authenticity, and Machiavellianism.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Call, Justin

    This contract report is one of a series of reports that document implementation components of the Bonneville Power Administration's (BPA) funded project: Integrated Status and Effectiveness Monitoring Program (ISEMP - BPA project No.2003-017-00, Chris Jordan, NOAA-NWFSC project sponsor). Other components of the project are separately reported, as explained below. The ISEMP project has been created as a cost effective means of developing protocols and new technologies, novel indicators, sample designs, analytical data management, communication tools and skills, and restoration experiments that support the development of a region-wide Research, Monitoring, and Evaluation (RME) program to assess the status of anadromous salmonidsmore » populations, their tributary habitat and restoration and management actions. The most straightforward approach to developing a regional-scale monitoring and evaluation program would be to increase standardization among status and trend monitoring programs. However, the diversity of species and their habitat, as well as the overwhelming uncertainty surrounding indicators, metrics, and data interpretation methods requires the testing of multiple approaches. Thus, ISEMP has adopted an approach to develop a broad template that may differ in the details among subbasins, but one that will ultimately lead to the formation of a unified RME process for the management of anadromous salmonid populations and habitat across the Columbia River Basin. ISEMP has been initiated in three pilot areas, the Wenatchee/Entiat, John Day, and Salmon. To balance replicating experimental approaches with the goal of developing monitoring and evaluation tools that apply as broadly as possible across the Pacific Northwest, these subbasins were chosen as representative of a wide range of potential challenges and conditions, e.g., differing fish species composition and life histories, ecoregions, institutional settings, and existing data. ISEMP has constructed a framework that builds on current status and trend monitoring infrastructures in these pilot subbasins, but challenges current programs by testing alternative monitoring approaches. In addition, the ISEMP is: (1) Collecting information over a hierarchy of spatial scales, allowing for a greater flexibility of data aggregation for multi-scale recovery planning assessments, and (2) Designing methods that: (a) Identify factors limiting fish production in watersheds; (b) Determine restoration actions to address these problems; (c) Implement actions as a large-scale experiment (e.g. Before After Control Impact, or BACI design), and (d) Implement intensive monitoring and research to evaluate the action's success. The intent of the ISEMP project is to design monitoring programs that can efficiently collect information to address multiple management objectives over a broad range of scales. This includes: Evaluating the status of anadromous salmonids and their habitat; Identifying opportunities to restore habitat function and fish performance, and Evaluating the benefits of the actions to the fish populations across the Columbia River Basin. The multi-scale nature of this goal requires the standardization of protocols and sampling designs that are statistically valid and powerful, properties that are currently inconsistent across the multiple monitoring programs in the region. Other aspects of the program will aid in the ability to extrapolate information beyond the study area, such as research to elucidate causal mechanisms, and a classification of watersheds throughout the Columbia River Basin. Obviously, the scale of the problem is immense and the ISEMP does not claim to be the only program working towards this goal. As such, ISEMP relies heavily on the basin's current monitoring infrastructure to test and develop monitoring strategies, while acting as a coordinating body and providing support for key elements such as data management and technical analyses. The ISEMP also ensures that monitoring programs can address large-scale management objectives (resulting largely from the ESA) through these local efforts. While the ISEMP maintains a regional focus it also returns the necessary information to aid in management at the smaller spatial scales (individual projects) where manipulations (e.g., habitat restoration actions) actually occur. The work captured in this report is a component of the overall ISEMP, and while it stands alone as an important contribution to the management of anadromous salmonids and their habitat, it also plays a key role within ISEMP. Each component of work within ISEMP is reported on individually, as is done so here, and in annual and triennial summary reports that present all of the overall project components in their programmatic context and shows how the data and tools developed can be applied to the development of regionally consistent, efficient and effective Research, Monitoring and Evaluation.« less

  17. A Real-time Ventilator Management Dashboard: Toward Hardwiring Compliance with Evidence-based Guidelines

    PubMed Central

    Starmer, John; Giuse, Dario

    2008-01-01

    Care of mechanically ventilated patients requires coordination between multiple caregivers, necessitating the availability of accurate and timely information on patient status. Researchers have documented positive effects of several interventions on the rates of developing ventilator associated complications, such as providing regular oral care and elevating the head of the bed. Informatics tools, such as electronic whiteboards, reminders, and alerts have been shown to aid in clinician compliance with guidelines or protocols. The purpose of this project was to design and implement a real-time ventilator management dashboard to show patient status with respect to elements important for ventilator management and infection prevention in the adult Intensive Care Units at Vanderbilt University Medical Center. PMID:18998939

  18. Structured Qualitative Research: Organizing “Mountains of Words” for Data Analysis, both Qualitative and Quantitative

    PubMed Central

    Johnson, Bruce D.; Dunlap, Eloise; Benoit, Ellen

    2008-01-01

    Qualitative research creates mountains of words. U.S. federal funding supports mostly structured qualitative research, which is designed to test hypotheses using semi-quantitative coding and analysis. The authors have 30 years of experience in designing and completing major qualitative research projects, mainly funded by the US National Institute on Drug Abuse [NIDA]. This article reports on strategies for planning, organizing, collecting, managing, storing, retrieving, analyzing, and writing about qualitative data so as to most efficiently manage the mountains of words collected in large-scale ethnographic projects. Multiple benefits accrue from this approach. Several different staff members can contribute to the data collection, even when working from remote locations. Field expenditures are linked to units of work so productivity is measured, many staff in various locations have access to use and analyze the data, quantitative data can be derived from data that is primarily qualitative, and improved efficiencies of resources are developed. The major difficulties involve a need for staff who can program and manage large databases, and who can be skillful analysts of both qualitative and quantitative data. PMID:20222777

  19. Approach to Managing MeaSURES Data at the GSFC Earth Science Data and Information Services Center (GES DISC)

    NASA Technical Reports Server (NTRS)

    Vollmer, Bruce; Kempler, Steven J.; Ramapriyan, Hampapuram K.

    2009-01-01

    A major need stated by the NASA Earth science research strategy is to develop long-term, consistent, and calibrated data and products that are valid across multiple missions and satellite sensors. (NASA Solicitation for Making Earth System data records for Use in Research Environments (MEaSUREs) 2006-2010) Selected projects create long term records of a given parameter, called Earth Science Data Records (ESDRs), based on mature algorithms that bring together continuous multi-sensor data. ESDRs, associated algorithms, vetted by the appropriate community, are archived at a NASA affiliated data center for archive, stewardship, and distribution. See http://measures-projects.gsfc.nasa.gov/ for more details. This presentation describes the NASA GSFC Earth Science Data and Information Services Center (GES DISC) approach to managing the MEaSUREs ESDR datasets assigned to GES DISC. (Energy/water cycle related and atmospheric composition ESDRs) GES DISC will utilize its experience to integrate existing and proven reusable data management components to accommodate the new ESDRs. Components include a data archive system (S4PA), a data discovery and access system (Mirador), and various web services for data access. In addition, if determined to be useful to the user community, the Giovanni data exploration tool will be made available to ESDRs. The GES DISC data integration methodology to be used for the MEaSUREs datasets is presented. The goals of this presentation are to share an approach to ESDR integration, and initiate discussions amongst the data centers, data managers and data providers for the purpose of gaining efficiencies in data management for MEaSUREs projects.

  20. Recent advances in applying decision science to managing national forests

    USGS Publications Warehouse

    Marcot, Bruce G.; Thompson, Matthew P.; Runge, Michael C.; Thompson, Frank R.; McNulty, Steven; Cleaves, David; Tomosy, Monica; Fisher, Larry A.; Andrew, Bliss

    2012-01-01

    Management of federal public forests to meet sustainability goals and multiple use regulations is an immense challenge. To succeed, we suggest use of formal decision science procedures and tools in the context of structured decision making (SDM). SDM entails four stages: problem structuring (framing the problem and defining objectives and evaluation criteria), problem analysis (defining alternatives, evaluating likely consequences, identifying key uncertainties, and analyzing tradeoffs), decision point (identifying the preferred alternative), and implementation and monitoring the preferred alternative with adaptive management feedbacks. We list a wide array of models, techniques, and tools available for each stage, and provide three case studies of their selected use in National Forest land management and project plans. Successful use of SDM involves participation by decision-makers, analysts, scientists, and stakeholders. We suggest specific areas for training and instituting SDM to foster transparency, rigor, clarity, and inclusiveness in formal decision processes regarding management of national forests.

  1. Quality control and quality assurance plan for bridge channel-stability assessments in Massachusetts

    USGS Publications Warehouse

    Parker, Gene W.; Pinson, Harlow

    1993-01-01

    A quality control and quality assurance plan has been implemented as part of the Massachusetts bridge scour and channel-stability assessment program. This program is being conducted by the U.S. Geological Survey, Massachusetts-Rhode Island District, in cooperation with the Massachusetts Highway Department. Project personnel training, data-integrity verification, and new data-management technologies are being utilized in the channel-stability assessment process to improve current data-collection and management techniques. An automated data-collection procedure has been implemented to standardize channel-stability assessments on a regular basis within the State. An object-oriented data structure and new image management tools are used to produce a data base enabling management of multiple data object classes. Data will be reviewed by assessors and data base managers before being merged into a master bridge-scour data base, which includes automated data-verification routines.

  2. Social and Economic Analysis Branch: integrating policy, social, economic, and natural science

    USGS Publications Warehouse

    Schuster, Rudy; Walters, Katie D.

    2015-01-01

    The Fort Collins Science Center's Social and Economic Analysis Branch provides unique capabilities in the U.S. Geological Survey by leading projects that integrate social, behavioral, economic, and natural science in the context of human–natural resource interactions. Our research provides scientific understanding and support for the management and conservation of our natural resources in support of multiple agency missions. We focus on meeting the scientific needs of the Department of the Interior natural resource management bureaus in addition to fostering partnerships with other Federal and State managers to protect, restore, and enhance our environment. The Social and Economic Analysis Branch has an interdisciplinary group of scientists whose primary functions are to conduct both theoretical and applied social science research, provide technical assistance, and offer training to support the development of skills in natural resource management activities. Management and research issues associated with human-resource interactions typically occur in a unique context and require knowledge of both natural and social sciences, along with the skill to integrate multiple science disciplines. In response to these challenging contexts, Social and Economic Analysis Branch researchers apply a wide variety of social science concepts and methods which complement our rangeland/agricultural, wildlife, ecology, and biology capabilities. The goal of the Social and Economic Analysis Branch's research is to enhance natural-resource management, agency functions, policies, and decisionmaking.

  3. Five principles for the practice of knowledge exchange in environmental management.

    PubMed

    Reed, M S; Stringer, L C; Fazey, I; Evely, A C; Kruijsen, J H J

    2014-12-15

    This paper outlines five principles for effective practice of knowledge exchange, which when applied, have the potential to significantly enhance the impact of environmental management research, policy and practice. The paper is based on an empirical analysis of interviews with 32 researchers and stakeholders across 13 environmental management research projects, each of which included elements of knowledge co-creation and sharing in their design. The projects focused on a range of upland and catchment management issues across the UK, and included Research Council, Government and NGO funded projects. Preliminary findings were discussed with knowledge exchange professionals and academic experts to ensure the emerging principles were as broadly applicable as possible across multiple disciplines. The principles suggest that: knowledge exchange needs to be designed into research; the needs of likely research users and other stakeholders should be systematically represented in the research where possible; and long-term relationships must be built on trust and two-way dialogue between researchers and stakeholders in order to ensure effective co-generation of new knowledge. We found that the delivery of tangible benefits early on in the research process helps to ensure continued motivation and engagement of likely research users. Knowledge exchange is a flexible process that must be monitored, reflected on and continuously refined, and where possible, steps should be taken to ensure a legacy of ongoing knowledge exchange beyond initial research funding. The principles have been used to inform the design of knowledge exchange and stakeholder engagement guidelines for two international research programmes. They are able to assist researchers, decision-makers and other stakeholders working in contrasting environmental management settings to work together to co-produce new knowledge, and more effectively share and apply existing knowledge to manage environmental change. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.

  4. Protocol for a randomised controlled trial of chronic disease self-management support for older Australians with multiple chronic diseases.

    PubMed

    Reed, Richard L; Battersby, Malcolm; Osborne, Richard H; Bond, Malcolm J; Howard, Sara L; Roeger, Leigh

    2011-11-01

    The prevalence of older Australians with multiple chronic diseases is increasing and now accounts for a large proportion of total health care utilisation. Chronic disease self-management support (CDSMS) has become a core service component of many community based health programs because it is considered a useful tool in improving population health outcomes and reducing the financial burden of chronic disease care. However, the evidence base to justify these support programs is limited, particularly for older people with multiple chronic diseases. We describe an ongoing trial examining the effectiveness of a particular CDSMS approach called the Flinders Program. The Flinders Program is a clinician-led generic self-management intervention that provides a set of tools and a structured process that enables health workers and patients to collaboratively assess self-management behaviours, identify problems, set goals, and develop individual care plans covering key self-care, medical, psychosocial and carer issues. A sample of 252 older Australians that have two or more chronic conditions will be randomly assigned to receive either CDSMS or an attention control intervention (health information only) for 6 months. Outcomes will be assessed using self-reported health measures taken at baseline and post-intervention. This project will be the first comprehensive evaluation of CDSMS in this population. Findings are expected to guide consumers, clinicians and policymakers in the use of CDSMS, as well as facilitate prioritisation of public monies towards evidence-based services. Copyright © 2011 Elsevier Inc. All rights reserved.

  5. Preliminary Concept of Operations for the Spent Fuel Management System--WM2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cumberland, Riley M; Adeniyi, Abiodun Idowu; Howard, Rob L

    The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the U.S. Department of Energy s Office of Nuclear Energy is tasked with identifying, planning, and conducting activities to lay the groundwork for developing interim storage and transportation capabilities in support of an integrated waste management system. The system will provide interim storage for commercial spent nuclear fuel (SNF) from reactor sites and deliver it to a repository. The system will also include multiple subsystems, potentially including; one or more interim storage facilities (ISF); one or more repositories; facilities to package and/or repackage SNF; and transportation systems. The project teammore » is analyzing options for an integrated waste management system. To support analysis, the project team has developed a Concept of Operations document that describes both the potential integrated system and inter-dependencies between system components. The goal of this work is to aid systems analysts in the development of consistent models across the project, which involves multiple investigators. The Concept of Operations document will be updated periodically as new developments emerge. At a high level, SNF is expected to travel from reactors to a repository. SNF is first unloaded from reactors and placed in spent fuel pools for wet storage at utility sites. After the SNF has cooled enough to satisfy loading limits, it is placed in a container at reactor sites for storage and/or transportation. After transportation requirements are met, the SNF is transported to an ISF to store the SNF until a repository is developed or directly to a repository if available. While the high level operation of the system is straightforward, analysts must evaluate numerous alternative options. Alternative options include the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if any), repackaging technology, the types of containers used, repository design, component sizing, and timing of events. These alternative options arise due to technological, economic, or policy considerations. As new developments regularly emerge, the operational concepts will be periodically updated. This paper gives an overview of the different potential alternatives identified in the Concept of Operations document at a conceptual level.« less

  6. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    ERIC Educational Resources Information Center

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  7. Advanced Avionics and Processor Systems for a Flexible Space Exploration Architecture

    NASA Technical Reports Server (NTRS)

    Keys, Andrew S.; Adams, James H.; Smith, Leigh M.; Johnson, Michael A.; Cressler, John D.

    2010-01-01

    The Advanced Avionics and Processor Systems (AAPS) project, formerly known as the Radiation Hardened Electronics for Space Environments (RHESE) project, endeavors to develop advanced avionic and processor technologies anticipated to be used by NASA s currently evolving space exploration architectures. The AAPS project is a part of the Exploration Technology Development Program, which funds an entire suite of technologies that are aimed at enabling NASA s ability to explore beyond low earth orbit. NASA s Marshall Space Flight Center (MSFC) manages the AAPS project. AAPS uses a broad-scoped approach to developing avionic and processor systems. Investment areas include advanced electronic designs and technologies capable of providing environmental hardness, reconfigurable computing techniques, software tools for radiation effects assessment, and radiation environment modeling tools. Near-term emphasis within the multiple AAPS tasks focuses on developing prototype components using semiconductor processes and materials (such as Silicon-Germanium (SiGe)) to enhance a device s tolerance to radiation events and low temperature environments. As the SiGe technology will culminate in a delivered prototype this fiscal year, the project emphasis shifts its focus to developing low-power, high efficiency total processor hardening techniques. In addition to processor development, the project endeavors to demonstrate techniques applicable to reconfigurable computing and partially reconfigurable Field Programmable Gate Arrays (FPGAs). This capability enables avionic architectures the ability to develop FPGA-based, radiation tolerant processor boards that can serve in multiple physical locations throughout the spacecraft and perform multiple functions during the course of the mission. The individual tasks that comprise AAPS are diverse, yet united in the common endeavor to develop electronics capable of operating within the harsh environment of space. Specifically, the AAPS tasks for the Federal fiscal year of 2010 are: Silicon-Germanium (SiGe) Integrated Electronics for Extreme Environments, Modeling of Radiation Effects on Electronics, Radiation Hardened High Performance Processors (HPP), and and Reconfigurable Computing.

  8. How will climate change affect watershed mercury export in a representative Coastal Plain watershed?

    NASA Astrophysics Data System (ADS)

    Golden, H. E.; Knightes, C. D.; Conrads, P. A.; Feaster, T.; Davis, G. M.; Benedict, S. T.; Bradley, P. M.

    2012-12-01

    Future climate change is expected to drive variations in watershed hydrological processes and water quality across a wide range of physiographic provinces, ecosystems, and spatial scales. How such shifts in climatic conditions will impact watershed mercury (Hg) dynamics and hydrologically-driven Hg transport is a significant concern. We simulate the responses of watershed hydrological and total Hg (HgT) fluxes and concentrations to a unified set of past and future climate change projections in a Coastal Plain basin using multiple watershed models. We use two statistically downscaled global precipitation and temperature models, ECHO, a hybrid of the ECHAM4 and HOPE-G models, and the Community Climate System Model (CCSM3) across two thirty-year simulations (1980 to 2010 and 2040 to 2070). We apply three watershed models to quantify and bracket potential changes in hydrologic and HgT fluxes, including the Visualizing Ecosystems for Land Management Assessment Model for Hg (VELMA-Hg), the Grid Based Mercury Model (GBMM), and TOPLOAD, a water quality constituent model linked to TOPMODEL hydrological simulations. We estimate a decrease in average annual HgT fluxes in response to climate change using the ECHO projections and an increase with the CCSM3 projections in the study watershed. Average monthly HgT fluxes increase using both climate change projections between in the late spring (March through May), when HgT concentrations and flow are high. Results suggest that hydrological transport associated with changes in precipitation and temperature is the primary mechanism driving HgT flux response to climate change. Our multiple model/multiple projection approach allows us to bracket the relative response of HgT fluxes to climate change, thereby illustrating the uncertainty associated with the projections. In addition, our approach allows us to examine potential variations in climate change-driven water and HgT export based on different conceptualizations of watershed HgT dynamics and the representative mathematical structures underpinning existing watershed Hg models.

  9. Coastwide Reference Monitoring System (CRMS)

    USGS Publications Warehouse

    2010-01-01

    In 1990, the U.S. Congress enacted the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA) in response to growing awareness of a land loss crisis in Louisiana. Projects funded by CWPPRA require monitoring and evaluation of project effectiveness, and there is also a need to assess the cumulative effects of all projects to achieve a sustainable coastal environment. In 2003, the Louisiana Office of Coastal Protection and Restoration (OCPR) and the U.S. Geological Survey (USGS) received approval from the CWPPRA Task Force to implement the Coastwide Reference Monitoring System (CRMS) as a mechanism to monitor and evaluate the effectiveness of CWPPRA projects at the project, region, and coastwide levels. The CRMS design implements a multiple reference approach by using aspects of hydrogeomorphic functional assessments and probabilistic sampling. The CRMS program is as dynamic as the coastal habitats it monitors. The program is currently funded through CWPPRA and provides data for a variety of user groups, including resource managers, academics, landowners, and researchers.

  10. 21st century drought outlook for major climate divisions of Texas based on CMIP5 multimodel ensemble: Implications for water resource management

    NASA Astrophysics Data System (ADS)

    Venkataraman, Kartik; Tummuri, Spandana; Medina, Aldo; Perry, Jordan

    2016-03-01

    Management of water resources in Texas (United States) is a challenging endeavor due to rapid population growth in the recent past coupled with significant spatiotemporal variations in climate. While climate conditions impact the availability of water, over-usage and lack of efficient management further complicate the dynamics of supply availability. In this paper, we provide the first look at the impact of climate change projections from an ensemble of Coupled Model Intercomparison Project Phase 5 (CMIP5) on 21st century drought characteristics under three future emission trajectories: Representative Concentration Pathway (RCP) 2.6, RCP 4.5 and RCP 8.5, using the standardized precipitation index (SPI) and standardized precipitation evapotranspiration index (SPEI). In addition, we evaluate the performance of the ensemble in simulating historical (1950-1999) observations from multiple climate divisions in Texas. Overall, the ensemble performs better in simulating historical temperature than precipitation. In semi-arid locations such as El Paso and Laredo, decreasing precipitation trends are projected even under the influence of climate policies represented by the RCP 4.5. There is little variability in the SPI across climate divisions and across RCPs. The SPEI, on the other hand, generally shows a decreasing trend toward the latter half of the 21st century, with multi-year droughts becoming the norm under the RCP 8.5, particularly in regions that are already dry, such as El Paso. Less severe droughts are projected for the sub-humid eastern edge of the state. Considering that state water planning agencies are already forecasting increased water shortages over the next 50 years, we recommend proactive approaches to risk management such as adjusting the planning tools for potential recurrence of multi-year droughts in regions that are already water-stressed.

  11. Capacity development for knowledge translation: evaluation of an experiential approach through secondment opportunities.

    PubMed

    Gerrish, Kate; Piercy, Hilary

    2014-06-01

    Experiential approaches to skills development using secondment models are shown to benefit healthcare organizations more generally, but little is known about the potential of this approach to develop capacity for knowledge translation (KT). To evaluate the success of KT capacity development secondments from the perspective of multiple stakeholders. A pluralistic evaluation design was used. Data were collected during 2011-2012 using focus group and individual interviews with 14 clinical and academic secondees, and five managers from host and seconding organizations to gain insight into participants' perceptions of the success of secondments and the criteria by which they judged success. Six After Action Reviews were undertaken with KT project teams to explore participants' perceptions of the contribution secondees made to KT projects. Semistructured interviews were undertaken with three healthcare managers on completion of projects to explore the impact of secondments on the organization, staff, and patients. Qualitative content analysis was used to identify criteria for success. The criteria provided a framework through which the overall success of secondments could be judged. Six criteria for judging the success of the secondments at individual, team, and organization level were identified: KT skills development, effective workload management, team working, achieving KT objectives, enhanced care delivery, and enhanced education delivery. Benefits to the individual, KT team, seconding, and host organizations were identified. Hosting teams should provide mentorship support to secondees, and be flexible to accommodate secondees' needs as team members. Ongoing support of managers from seconding organizations is needed to maximize the benefits to individual secondees and the organization. Experiential approaches to KT capacity development using secondments can benefit individual secondees, project teams, seconding, and host organizations. © 2014 Sigma Theta Tau International.

  12. Climate Change Resilience Planning at the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.; Johnson, A.

    2015-12-01

    The Savannah River National Laboratory (SRNL) is developing a site sustainability plan for the Department of Energy's Savannah River Site (SRS) in South Carolina in accordance with Executive Order 13693, which charges each DOE agency with "identifying and addressing projected impacts of climate change" and "calculating the potential cost and risk to mission associated with agency operations". The plan will comprise i) projections of climate change, ii) surveys of site managers to estimate the effects of climate change on site operations, and iii) a determination of adaptive actions. Climate change projections for SRS are obtained from multiple sources, including an online repository of downscaled global climate model (GCM) simulations of future climate and downscaled GCM simulations produced at SRNL. Taken together, we have projected data for temperature, precipitation, humidity, and wind - all variables with a strong influence on site operations. SRNL is working to engage site facility managers and facilitate a "bottom up" approach to climate change resilience planning, where the needs and priorities of stakeholders are addressed throughout the process. We make use of the Vulnerability Assessment Scoring Tool, an Excel-based program designed to accept as input various climate scenarios ('exposure'), the susceptibility of assets to climate change ('sensitivity'), and the ability of these assets to cope with climate change ('adaptive capacity'). These are combined to produce a series of scores that highlight vulnerabilities. Working with site managers, we have selected the most important assets, estimated their expected response to climate change, and prepared a report highlighting the most endangered facilities. Primary risks include increased energy consumption, decreased water availability, increased forest fire danger, natural resource degradation, and compromised outdoor worker safety in a warmer and more humid climate. Results of this study will aid in driving future management decisions and promoting sustainable practices at SRS.

  13. Simulation of Mission Phases

    NASA Technical Reports Server (NTRS)

    Carlstrom, Nicholas Mercury

    2016-01-01

    This position with the Simulation and Graphics Branch (ER7) at Johnson Space Center (JSC) provided an introduction to vehicle hardware, mission planning, and simulation design. ER7 supports engineering analysis and flight crew training by providing high-fidelity, real-time graphical simulations in the Systems Engineering Simulator (SES) lab. The primary project assigned by NASA mentor and SES lab manager, Meghan Daley, was to develop a graphical simulation of the rendezvous, proximity operations, and docking (RPOD) phases of flight. The simulation is to include a generic crew/cargo transportation vehicle and a target object in low-Earth orbit (LEO). Various capsule, winged, and lifting body vehicles as well as historical RPOD methods were evaluated during the project analysis phase. JSC core mission to support the International Space Station (ISS), Commercial Crew Program (CCP), and Human Space Flight (HSF) influenced the project specifications. The simulation is characterized as a 30 meter +V Bar and/or -R Bar approach to the target object's docking station. The ISS was selected as the target object and the international Low Impact Docking System (iLIDS) was selected as the docking mechanism. The location of the target object's docking station corresponds with the RPOD methods identified. The simulation design focuses on Guidance, Navigation, and Control (GNC) system architecture models with station keeping and telemetry data processing capabilities. The optical and inertial sensors, reaction control system thrusters, and the docking mechanism selected were based on CCP vehicle manufacturer's current and proposed technologies. A significant amount of independent study and tutorial completion was required for this project. Multiple primary source materials were accessed using the NASA Technical Report Server (NTRS) and reference textbooks were borrowed from the JSC Main Library and International Space Station Library. The Trick Simulation Environment and User Training Materials version 2013.0 release was used to complete the Trick tutorial. Multiple network privilege and repository permission requests were required in order to access previous simulation models. The project was also an introduction to computer programming and the Linux operating system. Basic C++ and Python syntax was used during the completion of the Trick tutorial. Trick's engineering analysis and Monte Carlo simulation capabilities were observed and basic space mission planning procedures were applied in the conceptual design phase. Multiple professional development opportunities were completed in addition to project duties during this internship through the System for Administration, Training, and Education Resources for NASA (SATERN). Topics include: JSC Risk Management Workshop, CCP Risk Management, Basic Radiation Safety Training, X-Ray Radiation Safety, Basic Laser Safety, JSC Export Control, ISS RISE Ambassador, Basic SharePoint 2013, Space Nutrition and Biochemistry, and JSC Personal Protective Equipment. Additionally, this internship afforded the opportunity for formal project presentation and public speaking practice. This was my first experience at a NASA center. After completing this internship I have a much clearer understanding of certain aspects of the agency's processes and procedures, as well as a deeper appreciation from spaceflight simulation design and testing. I will continue to improve my technical skills so that I may have another opportunity to return to NASA and Johnson Space Center.

  14. How we manage autologous stem cell transplantation for patients with multiple myeloma

    PubMed Central

    Dingli, David

    2014-01-01

    An estimated 22 350 patients had multiple myeloma diagnosed in 2013, representing 1.3% of all new cancers; 10 710 deaths are projected, representing 1.8% of cancer deaths. Approximately 0.7% of US men and women will have a myeloma diagnosis in their lifetime, and with advances in therapy, 77 600 US patients are living with myeloma. The 5-year survival rate was 25.6% in 1989 and was 44.9% in 2005. The median age at diagnosis is 69 years, with 62.4% of patients aged 65 or older at diagnosis. Median age at death is 75 years. The rate of new myeloma cases has been rising 0.7% per year during the past decade. The most common indication for autologous stem cell transplantation in the United States is multiple myeloma, and this article is designed to provide the specifics of organizing a transplant program for multiple myeloma. We review the data justifying use of stem cell transplantation as initial management in myeloma patients. We provide selection criteria that minimize the risks of transplantation. Specific guidelines on mobilization and supportive care through the transplant course, as done at Mayo Clinic, are given. A review of the data on tandem vs sequential autologous transplants is provided. PMID:24973360

  15. Ecological requirements for pallid sturgeon reproduction and recruitment in the Missouri River: annual report 2011

    USGS Publications Warehouse

    DeLonay, Aaron J.; Jacobson, Robert B.; Chojnacki, Kimberly A.; Annis, Mandy L.; Braaten, P. J.; Elliott, Caroline M.; Fuller, D. B.; Haas, Justin D.; Haddix, Tyler M.; Ladd, Hallie L.A.; McElroy, Brandon J.; Mestl, Gerald E.; Papoulias, Diana M.; Rhoten, Jason C.; Wildhaber, Mark L.

    2014-01-01

    The Comprehensive Sturgeon Research Project is a multiyear, multiagency collaborative research framework developed to provide information to support pallid sturgeon recovery and Missouri River management decisions. The project strategy integrates field and laboratory studies of sturgeon reproductive ecology, early life history, habitat requirements, and physiology. The project scope of work is developed annually with cooperating research partners and in collaboration with the U.S. Army Corps of Engineers, Missouri River Recovery—Integrated Science Program. The research consists of several interdependent and complementary tasks that engage multiple disciplines. The research tasks in the 2011 scope of work emphasized understanding of reproductive migrations and spawning of adult sturgeon, and hatch and drift of larvae. These tasks were addressed in three hydrologically and geomorphologically distinct parts of the Missouri River Basin: the Lower Missouri River downstream from Gavins Point Dam, the Upper Missouri River downstream from Fort Peck Dam and including downstream reaches of the Milk River, and the Lower Yellowstone River. The research is designed to inform management decisions related to channel re-engineering, flow modification, and pallid sturgeon population augmentation on the Missouri River, and throughout the range of the species. Research and progress made through this project are reported to the U.S. Army Corps of Engineers annually. This annual report details the research effort and progress made by the Comprehensive Sturgeon Research Project during 2011.

  16. What Ambulatory Care Managers Need to Know About Examination Room Utilization Measurement and Analysis.

    PubMed

    Klarich, Mark J; Rea, Ronald W; Lal, Tarun Mohan; Garcia, Angel L; Steffens, Fay L

    2016-01-01

    Demand for ambulatory care visits is projected to increase 22% between 2008 and 2025. Given this growth, ambulatory care managers need to proactively plan for efficient use of scarce resources (ie, space, equipment, and staff). One important component of ambulatory care space (the number of examination rooms) is dependent on multiple factors, including variation in demand, hours of operation, scheduling, and staff. The authors (1) outline common data collection methods, (2) highlight analysis and reporting considerations for examination room utilization, and (3) provide a strategic framework for short- and long-term decision making for facility design or renovation.

  17. The 1984 ASEE-NASA summer faculty fellowship program (aeronautics and research)

    NASA Technical Reports Server (NTRS)

    Dah-Nien, F.; Hodge, J. R.; Emad, F. P.

    1984-01-01

    The 1984 NASA-ASEE Faculty Fellowship Program (SFFP) is reported. The report includes: (1) a list of participants; (2) abstracts of research projects; (3) seminar schedule; (4) evaluation questionnaire; and (5) agenda of visitation by faculty programs committee. Topics discussed include: effects of multiple scattering on laser beam propagation; information management; computer techniques; guidelines for writing user documentation; 30 graphics software; high energy electron and antiproton cosmic rays; high resolution Fourier transform infrared spectrum; average monthly annual zonal and global albedos; laser backscattering from ocean surface; image processing systems; geomorphological mapping; low redshift quasars; application of artificial intelligence to command management systems.

  18. Analyzing Uncertainty and Risk in the Management of Water Resources in the State Of Texas

    NASA Astrophysics Data System (ADS)

    Singh, A.; Hauffpauir, R.; Mishra, S.; Lavenue, M.

    2010-12-01

    The State of Texas updates its state water plan every five years to determine the water demand required to meet its growing population. The plan compiles forecasts of water deficits from state-wide regional water planning groups as well as the water supply strategies to address these deficits. To date, the plan has adopted a deterministic framework, where reference values (e.g., best estimates, worst-case scenario) are used for key factors such as population growth, demand for water, severity of drought, water availability, etc. These key factors can, however, be affected by multiple sources of uncertainties such as - the impact of climate on surface water and groundwater availability, uncertainty in population projections, changes in sectoral composition of the economy, variability in water usage, feasibility of the permitting process, cost of implementation, etc. The objective of this study was to develop a generalized and scalable methodology for addressing uncertainty and risk in water resources management both at the regional and the local water planning level. The study proposes a framework defining the elements of an end-to-end system model that captures the key components of demand, supply and planning modules along with their associated uncertainties. The framework preserves the fundamental elements of the well-established planning process in the State of Texas, promoting an incremental and stakeholder-driven approach to adding different levels of uncertainty (and risk) into the decision-making environment. The uncertainty in the water planning process is broken down into two primary categories: demand uncertainty and supply uncertainty. Uncertainty in Demand is related to the uncertainty in population projections and the per-capita usage rates. Uncertainty in Supply, in turn, is dominated by the uncertainty in future climate conditions. Climate is represented in terms of time series of precipitation, temperature and/or surface evaporation flux for some future time period of interest, which can be obtained as outputs of global climate models (GCMs). These are then linked with hydrologic and water-availability models (WAMs) to estimate water availability for the worst drought conditions under each future climate scenario. Combining the demand scenarios with the water availability scenarios yields multiple scenarios for water shortage (or surplus). Given multiple shortage/surplus scenarios, various water management strategies can be assessed to evaluate the reliability of meeting projected deficits. These reliabilities are then used within a multi-criteria decision-framework to assess trade-offs between various water management objectives, thus helping to make more robust decisions while planning for the water needs of the future.

  19. Decision analysis for designing marine protected areas for multiple species with uncertain fishery status.

    PubMed

    White, J Wilson; Botsford, Louis W; Moffitt, Elizabeth A; Fischer, Douglas T

    2010-09-01

    Marine protected areas (MPAs) are growing in popularity as a conservation tool, and there are increasing calls for additional MPAs. Meta-analyses indicate that most MPAs successfully meet the minimal goal of increasing biomass inside the MPA, while some do not, leaving open the important question of what makes MPAs successful. An often-overlooked aspect of this problem is that the success of fishery management outside MPA boundaries (i.e., whether a population is overfished) affects how well MPAs meet both conservation goals (e.g., increased biomass) and economic goals (e.g., minimal negative effects on fishery yield). Using a simple example of a system with homogeneous habitat and periodically spaced MPAs, we show that, as area in MPAs increases, (1) conservation value (biomass) may initially be zero, implying no benefit, then at some point increases monotonically; and (2) fishery yield may be zero, then increases monotonically to a maximum beyond which further increase in MPA area causes yield to decline. Importantly, the points at which these changes in slope occur vary among species and depend on management outside MPAs. Decision makers considering the effects of a potential system of MPAs on multiple species are confronted by a number of such cost-benefit curves, and it is usually impossible to maximize benefits and minimize costs for all species. Moreover, the precise shape of each curve is unknown due to uncertainty regarding the fishery status of each species. Here we describe a decision-analytic approach that incorporates existing information on fishery stock status to present decision makers with the range of likely outcomes of MPA implementation. To summarize results from many species whose overfishing status is uncertain, our decision-analysis approach involves weighted averages over both overfishing uncertainty and species. In an example from an MPA decision process in California, USA, an optimistic projection of future fishery management success led to recommendation of fewer and smaller MPAs than that derived from a more pessimistic projection of future management success. This example illustrates how information on fishery status can be used to project potential outcomes of MPA implementation within a decision analysis framework and highlights the need for better population information.

  20. Increasing quality and managing complexity in neuroinformatics software development with continuous integration.

    PubMed

    Zaytsev, Yury V; Morrison, Abigail

    2012-01-01

    High quality neuroscience research requires accurate, reliable and well maintained neuroinformatics applications. As software projects become larger, offering more functionality and developing a denser web of interdependence between their component parts, we need more sophisticated methods to manage their complexity. If complexity is allowed to get out of hand, either the quality of the software or the speed of development suffer, and in many cases both. To address this issue, here we develop a scalable, low-cost and open source solution for continuous integration (CI), a technique which ensures the quality of changes to the code base during the development procedure, rather than relying on a pre-release integration phase. We demonstrate that a CI-based workflow, due to rapid feedback about code integration problems and tracking of code health measures, enabled substantial increases in productivity for a major neuroinformatics project and additional benefits for three further projects. Beyond the scope of the current study, we identify multiple areas in which CI can be employed to further increase the quality of neuroinformatics projects by improving development practices and incorporating appropriate development tools. Finally, we discuss what measures can be taken to lower the barrier for developers of neuroinformatics applications to adopt this useful technique.

  1. Hyper-Spectral Networking Concept of Operations and Future Air Traffic Management Simulations

    NASA Technical Reports Server (NTRS)

    Davis, Paul; Boisvert, Benjamin

    2017-01-01

    The NASA sponsored Hyper-Spectral Communications and Networking for Air Traffic Management (ATM) (HSCNA) project is conducting research to improve the operational efficiency of the future National Airspace System (NAS) through diverse and secure multi-band, multi-mode, and millimeter-wave (mmWave) wireless links. Worldwide growth of air transportation and the coming of unmanned aircraft systems (UAS) will increase air traffic density and complexity. Safe coordination of aircraft will require more capable technologies for communications, navigation, and surveillance (CNS). The HSCNA project will provide a foundation for technology and operational concepts to accommodate a significantly greater number of networked aircraft. This paper describes two of the HSCNA projects technical challenges. The first technical challenge is to develop a multi-band networking concept of operations (ConOps) for use in multiple phases of flight and all communication link types. This ConOps will integrate the advanced technologies explored by the HSCNA project and future operational concepts into a harmonized vision of future NAS communications and networking. The second technical challenge discussed is to conduct simulations of future ATM operations using multi-bandmulti-mode networking and technologies. Large-scale simulations will assess the impact, compared to todays system, of the new and integrated networks and technologies under future air traffic demand.

  2. Increasing quality and managing complexity in neuroinformatics software development with continuous integration

    PubMed Central

    Zaytsev, Yury V.; Morrison, Abigail

    2013-01-01

    High quality neuroscience research requires accurate, reliable and well maintained neuroinformatics applications. As software projects become larger, offering more functionality and developing a denser web of interdependence between their component parts, we need more sophisticated methods to manage their complexity. If complexity is allowed to get out of hand, either the quality of the software or the speed of development suffer, and in many cases both. To address this issue, here we develop a scalable, low-cost and open source solution for continuous integration (CI), a technique which ensures the quality of changes to the code base during the development procedure, rather than relying on a pre-release integration phase. We demonstrate that a CI-based workflow, due to rapid feedback about code integration problems and tracking of code health measures, enabled substantial increases in productivity for a major neuroinformatics project and additional benefits for three further projects. Beyond the scope of the current study, we identify multiple areas in which CI can be employed to further increase the quality of neuroinformatics projects by improving development practices and incorporating appropriate development tools. Finally, we discuss what measures can be taken to lower the barrier for developers of neuroinformatics applications to adopt this useful technique. PMID:23316158

  3. Six Sigma: not for the faint of heart.

    PubMed

    Benedetto, Anthony R

    2003-01-01

    Six Sigma is an excellent quality and performance improvement tool. Like any tool, the results of using it are highly dependent on whether you use it with competence and on the right problem. This article will help you decide if your problem is well-suited for a Six Sigma approach and will suggest the optimum approach for planning and implementing Six Sigma methodology. Performance improvement methods can be grouped into two broad categories, based on the problem to be addressed. When the problem is relatively minor and localized, "evolutionary" methods may be suitable (e.g., quality circles, problem-solving staff meetings, continuous quality improvement [CQI], total quality management [TQM]). These tools work best when modest incremental improvements are sought, when major process redesign is not thought to be necessary, and when the avoidance of workplace disruption is desired. Reengineering and Six Sigma are the best-known examples of the "revolutionary" performance improvement methods. These methods should be used when major (drastic, do or die, etc.) improvements are needed. Problems that cross departmental boundaries need these methods. When a process is so dysfunctional that you feel like you need to tear up the standard operating procedure (SOP) and start all over again, you need a revolutionary method. A Six Sigma project requires a major expenditure of money and employee time, and a willingness to make some hard decisions about jobs, employee retention and relationships among stakeholders. An institution's culture should be considered as part of the decision about using Six Sigma. If the institution has a history of making data-driven decisions, or at least has displayed openness to operating in that manner, Six Sigma has a good chance of success. A radiology-driven Six Sigma project should not be undertaken until a comprehensive written description of the scope of the project is approved by the radiology department leadership team and by the appropriate higher-level institutional leaders. This document should address the specific outcomes desired, the resources available, a rough tentative timeline, and any political constraints imposed on the project (e.g., inviolate HR policies, compatibility with enterprise strategic goals). The document should be comprehensive enough and explicit enough to be useful as a major component of the bid package for hiring a consultant or for writing the job description for the hiring of an in-house expert. A full-time project manager should be designated if an in-house expert is not hired. This person should be a senior leader in the department, but not the department director. Leading a Six Sigma project is a full-time job in itself and cannot be performed as an additional duty. Although it may be tempting to appoint a senior staff technologist or nurse, keep in mind that the project manager must have sufficient authority to expect cooperation from departmental supervisors without resorting to frequent appeals to the department director. Contact the institution's CIO and ask that a knowledgeable person on the IT staff be appointed to serve as the IT liaison for the project. This person should have in-depth familiarity with the HIS and the ways that it interfaces with the RIS (if the RIS is not a module within the HIS). Most importantly, this liaison must understand the exact data definitions and the origins of the data that are passed between the HIS and the RIS. The steering committee should consist of at least one physician and one department-level administrator from outside of the radiology department. From within the radiology department, there should be at least one radiologist and one senior modality manager (whose modality is not the primary focus), the project manager, and the manager of a radiology component that is a focus of the project (e.g., the film library manager). The consultant should be an ex officio member without vote. The steering committee should be small enough to be manageable, yet large enough to provide insight from both the radiology department and the rest of the institution. Because of the size of the steering committee and the difficulty of bringing so many people together for meetings, the day-to-day governance of the project will be provided by an informal "operations committee." When we consider "change" in the context of a Six Sigma project, we talk about a wide variety of topics, but they can be summarized usefully as dealing with processes, policies, physical plant and equipment, personnel, and politics (or culture). The first three of these lend themselves to quantitative analysis, or at least rigorously qualitative analysis. The final two, however, are subjective, ill-defined or not readily acknowledged, and fraught with potentially major challenges when it becomes necessary to implement changes in the first three. The Six Sigma process, as taught by GE, consists of five phases summarized by the acronym DMAIC: Define, Measure, Analyze, Improve and Control. This article deals mostly with the time period from first consideration of a possible Six Sigma project through the early part of the Define phase. It also discusses pitfalls that must be considered anytime throughout a project, from first thoughts of conducting a project until recommended changes become ingrained in the department's operations. Six Sigma compares baseline or historical data to data obtained after implementation of Six Sigma-driven changes in order to determine if desired changes in performance have been achieved. When historical data are not available, the Six Sigma team must collect baseline data as one of their earliest tasks. A Six Sigma project can easily last 18 to 24 months or longer. We must be sure that the data we collect during Month 18 are collected identically to the data we collected at baseline. A major performance improvement project is likely to require 12 to 24 months or longer. Upper management initially may be reluctant to appoint the "cream of the crop" to the project teams. Success is predicated on having the most knowledgeable personnel involved in the project. Without them, the chances of success are reduced. A Six Sigma project's length always exceeds the attention span of the vast majority of its participants. The department director and project manager must anticipate this and devote special efforts to maintaining motivation and momentum after the initial flurry of activity. The complexity of a Six Sigma project will be greatly increased, and all of the pitfalls discussed here will be exacerbated, if your facility has multiple sites. At the simplest, the multiple sites will introduce complications in getting personnel to come to project meetings. The complications will escalate if the sites are under different management, such as a confederated health system. The project manager and the consultant will expend additional time and effort dealing with these issues, which likely will lengthen the project unavoidably. The project manager must spend time with the department's external customers who have significant stakes in the project. At a minimum, this should include relatively formal meetings with other department directors or subordinate managers and key physician and nurse leaders, and attendance at their managerial or staff meetings (you may need to ask to be invited). Although paper or e-mail surveys can be helpful, only sustained personal contact with a stakeholder will truly allow you to understand how they interact with radiology and what their concerns are. As with daily operational management, a performance improvement project requires attention to policies, procedures, processes, physical plant and infrastructure, personnel, and perhaps most importantly, to politics.

  4. The Invisible Work of Personal Health Information Management Among People With Multiple Chronic Conditions: Qualitative Interview Study Among Patients and Providers

    PubMed Central

    Witteman, Holly O; Hafeez, Baria; Provencher, Thierry; Van de Graaf, Mary; Wei, Esther

    2015-01-01

    Background A critical problem for patients with chronic conditions who see multiple health care providers is incomplete or inaccurate information, which can contribute to lack of care coordination, low quality of care, and medical errors. Objective As part of a larger project on applications of consumer health information technology (HIT) and barriers to its use, we conducted a semistructured interview study with patients with multiple chronic conditions (MCC) with the objective of exploring their role in managing their personal health information. Methods Semistructured interviews were conducted with patients and providers. Patients were eligible if they had multiple chronic conditions and were in regular care with one of two medical organizations in New York City; health care providers were eligible if they had experience caring for patients with multiple chronic conditions. Analysis was conducted from a grounded theory perspective, and recruitment was concluded when saturation was achieved. Results A total of 22 patients and 7 providers were interviewed; patients had an average of 3.5 (SD 1.5) chronic conditions and reported having regular relationships with an average of 5 providers. Four major themes arose: (1) Responsibility for managing medical information: some patients perceived information management and sharing as the responsibility of health care providers; others—particularly those who had had bad experiences in the past—took primary responsibility for information sharing; (2) What information should be shared: although privacy concerns did influence some patients’ perceptions of sharing of medical data, decisions about what to share were also heavily influenced by their understanding of health and disease and by the degree to which they understood the health care system; (3) Methods and tools varied: those patients who did take an active role in managing their records used a variety of electronic tools, paper tools, and memory; and (4) Information management as invisible work: managing transfers of medical information to solve problems was a tremendous amount of work that was largely unrecognized by the medical establishment. Conclusions We conclude that personal health information management should be recognized as an additional burden that MCC places upon patients. Effective structural solutions for information sharing, whether institutional ones such as care management or technological ones such as electronic health information exchange, are likely not only to improve the quality of information shared but reduce the burden on patients already weighed down by MCC. PMID:26043709

  5. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    PubMed Central

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  6. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    PubMed

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  7. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  8. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  9. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  10. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  11. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  12. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  13. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  14. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  15. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. A New Tool for Effective and Efficient Project Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willett, Jesse A

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  18. Stepwise approach to establishing multiple outreach laboratory information system-electronic medical record interfaces.

    PubMed

    Pantanowitz, Liron; Labranche, Wayne; Lareau, William

    2010-05-26

    Clinical laboratory outreach business is changing as more physician practices adopt an electronic medical record (EMR). Physician connectivity with the laboratory information system (LIS) is consequently becoming more important. However, there are no reports available to assist the informatician with establishing and maintaining outreach LIS-EMR connectivity. A four-stage scheme is presented that was successfully employed to establish unidirectional and bidirectional interfaces with multiple physician EMRs. This approach involves planning (step 1), followed by interface building (step 2) with subsequent testing (step 3), and finally ongoing maintenance (step 4). The role of organized project management, software as a service (SAAS), and alternate solutions for outreach connectivity are discussed.

  19. Stepwise approach to establishing multiple outreach laboratory information system-electronic medical record interfaces

    PubMed Central

    Pantanowitz, Liron; LaBranche, Wayne; Lareau, William

    2010-01-01

    Clinical laboratory outreach business is changing as more physician practices adopt an electronic medical record (EMR). Physician connectivity with the laboratory information system (LIS) is consequently becoming more important. However, there are no reports available to assist the informatician with establishing and maintaining outreach LIS–EMR connectivity. A four-stage scheme is presented that was successfully employed to establish unidirectional and bidirectional interfaces with multiple physician EMRs. This approach involves planning (step 1), followed by interface building (step 2) with subsequent testing (step 3), and finally ongoing maintenance (step 4). The role of organized project management, software as a service (SAAS), and alternate solutions for outreach connectivity are discussed. PMID:20805958

  20. Practical Tips and Techniques on the Process of Transdisciplinary Sea Level Rise Research

    NASA Astrophysics Data System (ADS)

    DeLorme, D.; Hagen, S. C.; Kidwell, D.; Stephens, S. H.

    2015-12-01

    There is increasing awareness of the need for transdisciplinary science to address complex climate change issues, yet practical guidance is lacking. This presentation describes the iterative planning, implementation, and evaluation process of an ongoing transdisciplinary sea level rise (SLR) research project. Observations, reflections, and recommendations from firsthand experience are shared, illustrated with examples, and placed within a transdisciplinary research framework. The NOAA-sponsored project, Ecological Effects of Sea Level Rise in the Northern Gulf of Mexico (EESLR-NGOM) is a six-year regional study involving a team of biology, ecology, civil/coastal engineering, and communication scholars working with government agency personnel and industry professionals; supervising students and post-doctoral researchers; and engaging a group of non-academic stakeholders (i.e., coastal resource managers). EESLR-NGOM's focus is on detailed assessment and process-based modeling to project SLR impacts on northern Gulf of Mexico coastal wetland habitats and flood plains. This presentation highlights collaboration, communication, and project management considerations, and explains knowledge co-production from a dynamic combination of natural and social scientific methods (secondary data analysis, computer modeling, field observations, field and laboratory experiments, focus group interviews, surveys) and interrelated stakeholder engagement mechanisms (advisory committee, project flow chart, workshops, focus groups, webinars) infused throughout the EESLR-NGOM project to improve accessibility and utility of the scientific results and products. Attention is also given to project evaluation including monitoring, multiple quantitative and qualitative measures, and recognition of challenges and limitations. This presentation should generate productive dialogue and direction for similar endeavors to find transformative solutions to pressing problems of climate change.

  1. The Optimizing Patient Transfers, Impacting Medical Quality, andImproving Symptoms:Transforming Institutional Care approach: preliminary data from the implementation of a Centers for Medicare and Medicaid Services nursing facility demonstration project.

    PubMed

    Unroe, Kathleen T; Nazir, Arif; Holtz, Laura R; Maurer, Helen; Miller, Ellen; Hickman, Susan E; La Mantia, Michael A; Bennett, Merih; Arling, Greg; Sachs, Greg A

    2015-01-01

    The Optimizing Patient Transfers, Impacting Medical Quality, and Improving Symptoms: Transforming Institutional Care (OPTIMISTIC) project aims to reduce avoidable hospitalizations of long-stay residents enrolled in 19 central Indiana nursing facilities. This clinical demonstration project, funded by the Centers for Medicare and Medicaid Services Innovations Center, places a registered nurse in each nursing facility to implement an evidence-based quality improvement program with clinical support from nurse practitioners. A description of the model is presented, and early implementation experiences during the first year of the project are reported. Important elements include better medical care through implementation of Interventions to Reduce Acute Care Transfers tools and chronic care management, enhanced transitional care, and better palliative care with a focus on systematic advance care planning. There were 4,035 long-stay residents in 19 facilities enrolled in OPTIMISTIC between February 2013 and January 2014. Root-cause analyses were performed for all 910 acute transfers of these long stay residents. Of these transfers, the project RN evaluated 29% as avoidable (57% were not avoidable and 15% were missing), and opportunities for quality improvement were identified in 54% of transfers. Lessons learned in early implementation included defining new clinical roles, integrating into nursing facility culture, managing competing facility priorities, communicating with multiple stakeholders, and developing a system for collecting and managing data. The success of the overall initiative will be measured primarily according to reduction in avoidable hospitalizations of long-stay nursing facility residents. © 2014, Copyright the Authors Journal compilation © 2014, The American Geriatrics Society.

  2. Advanced Post-Irradiation Examination Capabilities Alternatives Analysis Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeff Bryan; Bill Landman; Porter Hill

    2012-12-01

    An alternatives analysis was performed for the Advanced Post-Irradiation Capabilities (APIEC) project in accordance with the U.S. Department of Energy (DOE) Order DOE O 413.3B, “Program and Project Management for the Acquisition of Capital Assets”. The Alternatives Analysis considered six major alternatives: ? No Action ? Modify Existing DOE Facilities – capabilities distributed among multiple locations ? Modify Existing DOE Facilities – capabilities consolidated at a few locations ? Construct New Facility ? Commercial Partnership ? International Partnerships Based on the alternatives analysis documented herein, it is recommended to DOE that the advanced post-irradiation examination capabilities be provided by amore » new facility constructed at the Materials and Fuels Complex at the Idaho National Laboratory.« less

  3. Cooperative fault-tolerant distributed computing U.S. Department of Energy Grant DE-FG02-02ER25537 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sunderam, Vaidy S.

    2007-01-09

    The Harness project has developed novel software frameworks for the execution of high-end simulations in a fault-tolerant manner on distributed resources. The H2O subsystem comprises the kernel of the Harness framework, and controls the key functions of resource management across multiple administrative domains, especially issues of access and allocation. It is based on a “pluggable” architecture that enables the aggregated use of distributed heterogeneous resources for high performance computing. The major contributions of the Harness II project result in significantly enhancing the overall computational productivity of high-end scientific applications by enabling robust, failure-resilient computations on cooperatively pooled resource collections.

  4. Diversified Native Species Restoration for Recovery of Multiple Ecosystem Services in a Highly Disturbed Tropical Dry Forest Landscape of Southwestern Nicaragua

    NASA Astrophysics Data System (ADS)

    Williams-Guillen, K.; Otterstrom, S.; Perla, C.

    2015-12-01

    Tropical dry forests have been reduced to a fraction of their original extent in the Neotropics due to conversion to agriculture and cattle pasture. While TDF can recover via natural regeneration, resulting forests are dominated by wind-dispersed pioneer species of limited value for frugivorous wildlife. Additionally, passive restoration can be perceived as "abandonment" resulting in neighbors casually invading property to rear livestock and extract timber. In 2007, the NGO Paso Pacífico initiated restoration in a highly degraded tropical dry forest landscape of southwestern Nicaragua; funded by an ex-ante carbon purchase, the project was designed to integrate multiple native tree species known to provide resources used by local wildlife. We restored roughly 400 hectares spanning a rainfall gradient from dry to transitional moist forest, using reforestation (planting 70 species of tree seedlings in degraded pastures on a 4x4 m grid, leaving occurring saplings) and assisted regeneration (clearing vines and competing vegetation from saplings in natural regeneration and strategically managing canopy cover). In just over seven years, mean carbon increased nearly threefold, from to 21.5±5.0 to 57.9±9.6 SE tonnes/ha. Current carbon stocks match those of 20-year-old forests in the area, accumulated in less than a decade. Stem density per 15-m radius plot decreased from 16.3±2.3 to 12.5±0.9 SE, while species richness increased from 3.9±0.4 to 18.4±1.4 SE. Alpha richness of woody stems across plots increased from 36 to 94 species, and over 20 tree species established as a result of natural dispersal and recruitment. We have observed sensitive species such as spider monkeys and parrots foraging in restoration areas. Managed reforestation is a highly effective method for rapidly restoring the functionality of multiple ecosystem services in degraded TDF, particularly when social and political realities force restoration to coexist with human productive activities. Project techniques were developed in collaboration with local community members and incorporated indigenous practices regarding lunar cycles, intercropping, and other management aspects. We suggest that this integration was a critical aspect to project success, and that these approaches could be widely adapted throughout Central America.

  5. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  6. Climate change and watershed mercury export: a multiple projection and model analysis.

    PubMed

    Golden, Heather E; Knightes, Christopher D; Conrads, Paul A; Feaster, Toby D; Davis, Gary M; Benedict, Stephen T; Bradley, Paul M

    2013-09-01

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. An ensemble of watershed models was applied in the present study to simulate and evaluate the responses of hydrological and total Hg (THg) fluxes from the landscape to the watershed outlet and in-stream THg concentrations to contrasting climate change projections for a watershed in the southeastern coastal plain of the United States. Simulations were conducted under stationary atmospheric deposition and land cover conditions to explicitly evaluate the effect of projected precipitation and temperature on watershed Hg export (i.e., the flux of Hg at the watershed outlet). Based on downscaled inputs from 2 global circulation models that capture extremes of projected wet (Community Climate System Model, Ver 3 [CCSM3]) and dry (ECHAM4/HOPE-G [ECHO]) conditions for this region, watershed model simulation results suggest a decrease of approximately 19% in ensemble-averaged mean annual watershed THg fluxes using the ECHO climate-change model and an increase of approximately 5% in THg fluxes with the CCSM3 model. Ensemble-averaged mean annual ECHO in-stream THg concentrations increased 20%, while those of CCSM3 decreased by 9% between the baseline and projected simulation periods. Watershed model simulation results using both climate change models suggest that monthly watershed THg fluxes increase during the summer, when projected flow is higher than baseline conditions. The present study's multiple watershed model approach underscores the uncertainty associated with climate change response projections and their use in climate change management decisions. Thus, single-model predictions can be misleading, particularly in developmental stages of watershed Hg modeling. Copyright © 2013 SETAC.

  7. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  8. [Case Study] CityCenter and Cosmopolitan Construction Projects, Las Vegas, Nevada: lessons learned from the use of multiple sources and mixed methods in a safety needs assessment.

    PubMed

    Gittleman, Janie L; Gardner, Paige C; Haile, Elizabeth; Sampson, Julie M; Cigularov, Konstantin P; Ermann, Erica D; Stafford, Pete; Chen, Peter Y

    2010-06-01

    The present study describes a response to eight tragic deaths over an eighteen month times span on a fast track construction project on the largest commercial development project in U.S. history. Four versions of a survey were distributed to workers, foremen, superintendents, and senior management. In addition to standard Likert-scale safety climate scale items, an open-ended item was included at the end of the survey. Safety climate perceptions differed by job level. Specifically, management perceived a more positive safety climate as compared to workers. Content analysis of the open-ended item was used to identify important safety and health concerns which might have been overlooked with the qualitative portion of the survey. The surveys were conducted to understand workforce issues of concern with the aim of improving site safety conditions. Such efforts can require minimal investment of resources and time and result in critical feedback for developing interventions affecting organizational structure, management processes, and communication. The most important lesson learned was that gauging differences in perception about site safety can provide critical feedback at all levels of a construction organization. Implementation of multi-level organizational perception surveys can identify major safety issues of concern. Feedback, if acted upon, can potentially result in fewer injuries and fatal events. (c) 2010 Elsevier Ltd. All rights reserved.

  9. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    ERIC Educational Resources Information Center

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  10. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  11. Mosaicked Historic Airborne Imagery from Seward Peninsula, Alaska, Starting in the 1950's

    DOE Data Explorer

    Cherry, Jessica; Wirth, Lisa

    2016-12-06

    Historical airborne imagery for each Seward Peninsula NGEE Arctic site - Teller, Kougarok, Council - with multiple years for each site. This dataset includes mosaicked, geolocated and, where possible, orthorectified, historic airborne and recent satellite imagery. The older photos were sourced from USGS's Earth Explorer site and the newer, satellite imagery is from the Statewide Digital Mapping Initiative (SDMI) project managed by the Geographic Information Network of Alaska on behalf of the state of Alaska.

  12. Ending the U.S. War in Iraq: The Final Transition, Operational Maneuver, and Disestablishment of United States Forces-Iraq

    DTIC Science & Technology

    2013-01-01

    management survey and ensure that all databases (military and contracted civilian), key leader engagement logs, assistance project files, and other...Princeton University Press, 2000; Michael I. Handel, War Termination—A Critical Survey , Jeru- salem: Hebrew University, 1978; Jane Holl Lute, From the...DoS did not plan to install permanent and more costly security measures.133 Security surveys undertaken collaboratively by USF-I and multiple

  13. Cleared for Launch - Lessons Learned from the OSIRIS-REx System Requirements Verification Program

    NASA Technical Reports Server (NTRS)

    Stevens, Craig; Adams, Angela; Williams, Bradley; Goodloe, Colby

    2017-01-01

    Requirements verification of a large flight system is a challenge. It is especially challenging for engineers taking on their first role in space systems engineering. This paper describes our approach to verification of the Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) system requirements. It also captures lessons learned along the way from developing systems engineers embroiled in this process. We begin with an overview of the mission and science objectives as well as the project requirements verification program strategy. A description of the requirements flow down is presented including our implementation for managing the thousands of program and element level requirements and associated verification data. We discuss both successes and methods to improve the managing of this data across multiple organizational interfaces. Our approach to verifying system requirements at multiple levels of assembly is presented using examples from our work at instrument, spacecraft, and ground segment levels. We include a discussion of system end-to-end testing limitations and their impacts to the verification program. Finally, we describe lessons learned that are applicable to all emerging space systems engineers using our unique perspectives across multiple organizations of a large NASA program.

  14. Irvine Smart Grid Demonstration, a Regional Smart Grid Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yinger, Robert; Irwin, Mark

    ISGD was a comprehensive demonstration that spanned the electricity delivery system and extended into customer homes. The project used phasor measurement technology to enable substation-level situational awareness, and demonstrated SCE’s next-generation substation automation system. It extended beyond the substation to evaluate the latest generation of distribution automation technologies, including looped 12-kV distribution circuit topology using URCIs. The project team used DVVC capabilities to demonstrate CVR. In customer homes, the project evaluated HAN devices such as smart appliances, programmable communicating thermostats, and home energy management components. The homes were also equipped with energy storage, solar PV systems, and a number ofmore » energy efficiency measures (EEMs). The team used one block of homes to evaluate strategies and technologies for achieving ZNE. A home achieves ZNE when it produces at least as much renewable energy as the amount of energy it consumes annually. The project also assessed the impact of device-specific demand response (DR), as well as load management capabilities involving energy storage devices and plug-in electric vehicle charging equipment. In addition, the ISGD project sought to better understand the impact of ZNE homes on the electric grid. ISGD’s SENet enabled end-to-end interoperability between multiple vendors’ systems and devices, while also providing a level of cybersecurity that is essential to smart grid development and adoption across the nation. The ISGD project includes a series of sub-projects grouped into four logical technology domains: Smart Energy Customer Solutions, Next-Generation Distribution System, Interoperability and Cybersecurity, and Workforce of the Future. Section 2.3 provides a more detailed overview of these domains.« less

  15. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  16. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  17. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  18. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  19. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  20. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  1. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  2. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  3. Next generation paradigm for urban pluvial flood modelling, prediction, management and vulnerability reduction - Interaction between RainGain and Blue Green Dream projects

    NASA Astrophysics Data System (ADS)

    Maksimovic, C.

    2012-04-01

    The effects of climate change and increasing urbanisation call for a new paradigm for efficient planning, management and retrofitting of urban developments to increase resilience to climate change and to maximize ecosystem services. Improved management of urban floods from all sources in required. Time scale for well documented fluvial and coastal floods allows for timely response but surface (pluvial) flooding caused by intense local storms had not been given appropriate attention, Pitt Review (UK). Urban surface floods predictions require fine scale data and model resolutions. They have to be tackled locally by combining central inputs (meteorological services) with the efforts of the local entities. Although significant breakthrough in modelling of pluvial flooding was made there is a need to further enhance short term prediction of both rainfall and surface flooding. These issues are dealt with in the EU Iterreg project Rain Gain (RG). Breakthrough in urban flood mitigation can only be achieved by combined effects of advanced planning design, construction and management of urban water (blue) assets in interaction with urban vegetated areas' (green) assets. Changes in design and operation of blue and green assets, currently operating as two separate systems, is urgently required. Gaps in knowledge and technology will be introduced by EIT's Climate-KIC Blue Green Dream (BGD) project. The RG and BGD projects provide synergy of the "decoupled" blue and green systems to enhance multiple benefits to: urban amenity, flood management, heat island, biodiversity, resilience to drought thus energy requirements, thus increased quality of urban life at lower costs. Urban pluvial flood management will address two priority areas: Short Term rainfall Forecast and Short term flood surface forecast. Spatial resolution of short term rainfall forecast below 0.5 km2 and lead time of a few hours are needed. Improvements are achievable by combining data sources of raingauge networks with C-Band and X-Band radars with NWP and pluvial flood prediction models. The RG project deals with the merging and providing synergy of these technologies. Combined effects of BG technologies can totally reduce the risk of surface flooding for low return period events and up to 50-80% for high return periods. Demonstration technology testing sites for both BGD and RG projects will be established in 5 participating countries. Decision Support Systems will enhance full scale implementation of both BGD and RG project deliverables. A BGD efficiency rating scheme and training guidelines and e-learning tools will be developed. Experimental/demo sites for BDG and RG technology development and testing in Rotterdam, Paris, Berlin, Leuven and London and the expected results with concepts of RG and BGD projects and the initial results will be presented in the paper.

  4. CONTROL CHART DASHBOARDS MANAGING YOUR NUMBERS INSTEAD OF YOU NUMBER MANAGING YOU

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PREVETTE, S.S.

    2006-11-15

    This paper, which documents Fluor Hanford's application of Statistical Process Control (SPC) and Dashboards to support planning and decision making, is a sequel to ''Leading with Leading Indicators'' that was presented at WM 05. This year's paper provides more detail on management's use of SPC and control charts and discusses their integration into an executive summary using the popular color-cod3ed dashboard methodology. Fluor Hanford has applied SPC in a non-traditional (that is non-manufacturing) manner. Dr. Shewhart's 75-year-old control-chart methodologies have been updated to modern data processing, but are still founded on his sound, tried and true principles. These methods aremore » playing a key role in safety and quality at what has been called the world's largest environmental cleanup project. The US Department of Energy's (DOE's) Hanford Site played a pivotal role in the nation's defense, beginning in the 1940s when it was established as part of the Manhattan Project. After more than 50 years of producing nuclear weapons, Hanford--which covers 586 square miles in southeastern Washington state--is now focused on three outcomes: (1) restoring the Columbia River corridor for multiple uses; (2) transitioning the central plateau to support long-term waste management; and (3) putting DOE assets to work for the future.« less

  5. HydroCube: an entity-relationship hydrogeological data model

    NASA Astrophysics Data System (ADS)

    Wojda, Piotr; Brouyère, Serge; Derouane, Johan; Dassargues, Alain

    2010-12-01

    Managing, handling and accessing hydrogeological information depends heavily on the applied hydrogeological data models, which differ between institutions and countries. The effective dissemination of hydrogeological information requires the convergence of such models to make hydrogeological information accessible to multiple users such as universities, water suppliers, and administration and research organisations. Furthermore, because hydrogeological studies are complex, they require a wide variety of high-quality hydrogeological data with appropriate metadata in clearly designed and coherent structures. A need exists, therefore, to develop and implement hydrogeological data models that cover, as much as possible, the full hydrogeological domain. A new data model, called HydroCube, was developed for the Walloon Region in Belgium in 2005. The HydroCube model presents an innovative holistic project-based approach which covers a full set of hydrogeological concepts and features, allowing for effective hydrogeological project management. The model stores data relating to the project locality, hydrogeological equipment, and related observations and measurements. In particular, it focuses on specialized hydrogeological field experiments such as pumping and tracer tests. This logical data model uses entity-relationship diagrams and it has been implemented in the Microsoft Access environment. It has been enriched with a fully functional user interface.

  6. Influence of three common calibration metrics on the diagnosis of climate change impacts on water resources

    NASA Astrophysics Data System (ADS)

    Seiller, G.; Roy, R.; Anctil, F.

    2017-04-01

    Uncertainties associated to the evaluation of the impacts of climate change on water resources are broad, from multiple sources, and lead to diagnoses sometimes difficult to interpret. Quantification of these uncertainties is a key element to yield confidence in the analyses and to provide water managers with valuable information. This work specifically evaluates the influence of hydrological modeling calibration metrics on future water resources projections, on thirty-seven watersheds in the Province of Québec, Canada. Twelve lumped hydrologic models, representing a wide range of operational options, are calibrated with three common objective functions derived from the Nash-Sutcliffe efficiency. The hydrologic models are forced with climate simulations corresponding to two RCP, twenty-nine GCM from CMIP5 (Coupled Model Intercomparison Project phase 5) and two post-treatment techniques, leading to future projections in the 2041-2070 period. Results show that the diagnosis of the impacts of climate change on water resources are quite affected by the hydrologic models selection and calibration metrics. Indeed, for the four selected hydrological indicators, dedicated to water management, parameters from the three objective functions can provide different interpretations in terms of absolute and relative changes, as well as projected changes direction and climatic ensemble consensus. The GR4J model and a multimodel approach offer the best modeling options, based on calibration performance and robustness. Overall, these results illustrate the need to provide water managers with detailed information on relative changes analysis, but also absolute change values, especially for hydrological indicators acting as security policy thresholds.

  7. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    NASA Technical Reports Server (NTRS)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  8. NASA Cloud-Based Climate Data Services

    NASA Astrophysics Data System (ADS)

    McInerney, M. A.; Schnase, J. L.; Duffy, D. Q.; Tamkin, G. S.; Strong, S.; Ripley, W. D., III; Thompson, J. H.; Gill, R.; Jasen, J. E.; Samowich, B.; Pobre, Z.; Salmon, E. M.; Rumney, G.; Schardt, T. D.

    2012-12-01

    Cloud-based scientific data services are becoming an important part of NASA's mission. Our technological response is built around the concept of specialized virtual climate data servers, repetitive cloud provisioning, image-based deployment and distribution, and virtualization-as-a-service (VaaS). A virtual climate data server (vCDS) is an Open Archive Information System (OAIS) compliant, iRODS-based data server designed to support a particular type of scientific data collection. iRODS is data grid middleware that provides policy-based control over collection-building, managing, querying, accessing, and preserving large scientific data sets. We have deployed vCDS Version 1.0 in the Amazon EC2 cloud using S3 object storage and are using the system to deliver a subset of NASA's Intergovernmental Panel on Climate Change (IPCC) data products to the latest CentOS federated version of Earth System Grid Federation (ESGF), which is also running in the Amazon cloud. vCDS-managed objects are exposed to ESGF through FUSE (Filesystem in User Space), which presents a POSIX-compliant filesystem abstraction to applications such as the ESGF server that require such an interface. A vCDS manages data as a distinguished collection for a person, project, lab, or other logical unit. A vCDS can manage a collection across multiple storage resources using rules and microservices to enforce collection policies. And a vCDS can federate with other vCDSs to manage multiple collections over multiple resources, thereby creating what can be thought of as an ecosystem of managed collections. With the vCDS approach, we are trying to enable the full information lifecycle management of scientific data collections and make tractable the task of providing diverse climate data services. In this presentation, we describe our approach, experiences, lessons learned, and plans for the future.; (A) vCDS/ESG system stack. (B) Conceptual architecture for NASA cloud-based data services.

  9. A knowledge discovery object model API for Java

    PubMed Central

    Zuyderduyn, Scott D; Jones, Steven JM

    2003-01-01

    Background Biological data resources have become heterogeneous and derive from multiple sources. This introduces challenges in the management and utilization of this data in software development. Although efforts are underway to create a standard format for the transmission and storage of biological data, this objective has yet to be fully realized. Results This work describes an application programming interface (API) that provides a framework for developing an effective biological knowledge ontology for Java-based software projects. The API provides a robust framework for the data acquisition and management needs of an ontology implementation. In addition, the API contains classes to assist in creating GUIs to represent this data visually. Conclusions The Knowledge Discovery Object Model (KDOM) API is particularly useful for medium to large applications, or for a number of smaller software projects with common characteristics or objectives. KDOM can be coupled effectively with other biologically relevant APIs and classes. Source code, libraries, documentation and examples are available at . PMID:14583100

  10. Health promotion implementation capacities in hospitals matter: results from the PRICES-HPH study.

    PubMed

    Röthlin, Florian; Schmied, Hermann; Dietscher, Christina

    2017-06-01

    In this article, organizational implementation capacities are discussed as facilitators for hospital health promotion (HP) activities, based on data from 159 sampled hospitals of the PRICES-HPH study. PRICES-HPH is a cross-sectional evaluation study of the International Network of Health Promoting Hospitals and Health Services (HPH-Network) and was conducted from 2008 to 2012. Hospitals applying elaborated HP implementation capacities such as 'regular health promotion projects and organization-wide programs', 'established health promotion management systems' or the 'integration of health promotion in existing quality management systems' have better HP activity scores as compared with hospitals that implement HP on the basis of occasional projects only. Organizational capacities are associated with considerably higher chances for the successful implementation of a multiplicity of different HP activities in hospitals. The results add further evidence to the importance of capacity building in hospital HP. © The Author 2015. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  11. [Extraction of management information from the national quality assurance program].

    PubMed

    Stausberg, Jürgen; Bartels, Claus; Bobrowski, Christoph

    2007-07-15

    Starting with clinically motivated projects, the national quality assurance program has established a legislative obligatory framework. Annual feedback of results is an important means of quality control. The annual reports cover quality-related information with high granularity. A synopsis for corporate management is missing, however. Therefore, the results of the University Clinics in Greifswald, Germany, have been analyzed and aggregated to support hospital management. Strengths were identified by the ranking of results within the state for each quality indicator, weaknesses by the comparison with national reference values. The assessment was aggregated per clinical discipline and per category (indication, process, and outcome). A composition of quality indicators was claimed multiple times. A coherent concept is still missing. The method presented establishes a plausible summary of strengths and weaknesses of a hospital from the point of view of the national quality assurance program. Nevertheless, further adaptation of the program is needed to better assist corporate management.

  12. From Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge

    NASA Technical Reports Server (NTRS)

    Dubon, Lydia P.

    2006-01-01

    The Dawn GDS Team met the SC Sim integration challenge in eight months. The GDS System Engineering approach in response to the SC Simintegration challenge, focused on a set of key practices: decomposition of project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; risk management thru management of expectations; and aggregation of intermediate products into a final product. By maintaining a a system-level focus, the overall systems engineering process unified team GDS Team members with a common goal: the success of the ground system as a whole and not just the success of their individual expert contributions. Incorporation of Agile-type development efforts were aligned with a risk strategy based on team-oriented principles and expectations management, thus achieving a more stable baseline solution without compromising the integrity of the GDS design.

  13. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  14. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  15. A Multiple Watershed Approach to Assessing the Effects of Habitat Restoration Actions on Anadromous and Resident Fish Populations, Technical Report 2003-2004.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marmorek, David

    2004-03-01

    Habitat protection and restoration is a cornerstone of current strategies to restore ecosystems, recover endangered fish species, and rebuild fish stocks within the Columbia River Basin. Strategies featuring habitat restoration include the 2000 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS BiOp) developed by the National Marine Fisheries Service (NMFS), the 2000 Biological Opinion on Bull Trout developed by the US Fish and Wildlife Service (USFWS), and Sub-Basin Plans developed under the Fish and Wildlife Program of the Northwest Power and Conservation Council (NWPCC). There is however little quantitative information about the effectiveness of different habitatmore » restoration techniques. Such information is crucial for helping scientists and program managers allocate limited funds towards the greatest benefits for fish populations. Therefore, it is critical to systematically test the hypotheses underlying habitat restoration actions for both anadromous and resident fish populations. This pilot project was developed through a proposal to the Innovative Projects fund of the NWPCC (ESSA 2002). It was funded by the Bonneville Power Administration (BPA) following reviews by the Independent Scientific Review Panel (ISRP 2002), the Columbia Basin Fish and Wildlife Authority (CBFWA 2002), the NWPCC and BPA. The study was designed to respond directly to the above described needs for information on the effectiveness of habitat restoration actions, including legal measures specified in the 2000 FCRPS BiOp (RPA 183, pg. 9-133, NMFS 2000). Due to the urgency of addressing these measures, the timeline of the project was accelerated from a duration of 18 months to 14 months. The purpose of this pilot project was to explore methods for evaluating past habitat restoration actions and their effects on fish populations. By doing so, the project will provide a foundation of retrospective analyses, on which to build prospective, multi-watershed designs for future habitat restoration actions. Such designs are being developed concurrently with this project by several other groups in the Columbia Basin (RME Workgroup 2003, NMFS 2003, Hillman and Paulsen 2002, Hillman 2003). By addressing questions about habitat restoration and monitoring (in coordination with other related efforts), we hope that this project will catalyze a shift in the Basin's paradigm of habitat restoration, moving from implementation of individual watershed projects towards rigorously designed and monitored, multiwatershed, adaptive management experiments. The project involved three phases of work, which were closely integrated with various related and ongoing efforts in the region: (1) Scoping - We met with a Core Group of habitat experts and managers to scope out a set of testable habitat restoration hypotheses, identify candidate watersheds and recommend participants for a data evaluation workshop. (2) Data Assembly - We contacted over 80 scientists and managers to help evaluate the suitability of each candidate watershed's historical data for assessing the effectiveness of past restoration actions. We eventually settled on the Yakima, Wenatchee, Clearwater, and Salmon subbasins, and began gathering relevant data for these watersheds at a workshop with habitat experts and managers. Data assembly continued for several months after the workshop. (3) Data Analysis and Synthesis - We explored statistical approaches towards retrospectively analyzing the effects of restoration 'treatments' at nested spatial scales across multiple watersheds (Chapters 2-5 of this report). These analyses provided a foundation for identifying existing constraints to testing restoration hypotheses, and opportunities to overcome these constraints through improved experimental designs, monitoring protocols and project selection strategies (Chapters 6 and 7 of this report). Finally, we developed a set of recommendations to improve the design, implementation, and monitoring of prospective habitat restoration programs in the Columbia River Basin (Chapter 8).« less

  16. Evaluating the Relevance, Reliability, and Applicability of CMIP5 Climate Projections for Water Resources and Environmental Planning

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Scott, J.; Ferguson, I. M.; Arnold, J.; Raff, D. A.; Webb, R. S.

    2012-12-01

    Water managers need to understand the applicability of climate projection information available for decision-support at the scale of their applications. Applicability depends on information reliability and relevance. This need to understand applicability stems from expectations that entities rationalize adaptation investments or decisions to delay investment. It is also occurring at a time when new global climate projections are being released through the World Climate Research Programme Coupled Model Intercomparison Project phase 5 (CMIP5), which introduces new information opportunities and interpretation challenges. This project involves an interagency collaboration to evaluate the applicability of CMIP5 projections for use in water and environmental resources planning. The overarching goal is to develop and demonstrate a framework that involves dual evaluations of relevance and reliability informing an ultimate discussion and judgment of applicability, which is expected to vary with decision-making context. The framework is being developed and demonstrated within the context of reservoir systems management in California's Sacramento and San Joaquin River basins. The relevance evaluation focuses on identifying the climate variables and statistical measures relevant to long-term management questions, which may depend on satisfying multiple objectives. Past studies' results are being considered in this evaluation, along with new results from system sensitivity analyses conducted through this effort. The reliability evaluation focuses on the CMIP5 climate models' ability to simulate past conditions relative to observed references. The evaluation is being conducted across the global domain using a large menu of climate variables and statistical measures, leveraging lessons learned from similar evaluations of CMIP3 climate models. The global focus addresses a broader project goal of producing a web resource that can serve reliability information to applicability discussions around the world, with evaluation results being served through a web-portal similar to that developed by NOAA/CIRES to serve CMIP3 information on future climate extremes (http://www.esrl.noaa.gov/psd/ipcc/extremes/). The framework concludes with an applicability discussion informed by relevance and reliability results. The goal is to observe the discussion process and identify features, choice points, and challenges that might be summarized and shared with other resource management groups facing applicability questions. This presentation will discuss the project framework and preliminary results. In addition to considering CMIP5 21st century projection information, the framework is being developed to support evaluation of CMIP5 decadal predictability experiment simulations and reconcile those simulations with 21st century projections. The presentation will also discuss implications of considering the applicability of bias-corrected and downscaled information within this framework.

  17. Community Digital Library Requirements for the Southern California Earthquake Center Community Modeling Environment (SCEC/CME)

    NASA Astrophysics Data System (ADS)

    Moore, R.; Faerman, M.; Minster, J.; Day, S. M.; Ely, G.

    2003-12-01

    A community digital library provides support for ingestion, organization, description, preservation, and access of digital entities. The technologies that traditionally provide these capabilities are digital libraries (ingestion, organization, description), persistent archives (preservation) and data grids (access). We present a design for the SCEC community digital library that incorporates aspects of all three systems. Multiple groups have created integrated environments that sustain large-scale scientific data collections. By examining these projects, the following stages of implementation can be identified: \\begin{itemize} Definition of semantic terms to associate with relevant information. This includes definition of uniform content descriptors to describe physical quantities relevant to the scientific discipline, and creation of concept spaces to define how the uniform content descriptors are logically related. Organization of digital entities into logical collections that make it simple to browse and manage related material. Definition of services that are used to access and manipulate material in the collection. Creation of a preservation environment for the long-term management of the collection. Each community is faced with heterogeneity that is introduced when data is distributed across multiple sites, or when multiple sets of collection semantics are used, and or when multiple scientific sub-disciplines are federated. We will present the relevant standards that simplify the implementation of the SCEC community library, the resource requirements for different types of data sets that drive the implementation, and the digital library processes that the SCEC community library will support. The SCEC community library can be viewed as the set of processing steps that are required to build the appropriate SCEC reference data sets (SCEC approved encoding format, SCEC approved descriptive metadata, SCEC approved collection organization, and SCEC managed storage location). Each digital entity that is ingested into the SCEC community library is processed and validated for conformance to SCEC standards. These steps generate provenance, descriptive, administrative, structural, and behavioral metadata. Using data grid technology, the descriptive metadata can be registered onto a logical name space that is controlled and managed by the SCEC digital library. A version of the SCEC community digital library is being implemented in the Storage Resource Broker. The SRB system provides almost all the features enumerated above. The peer-to-peer federation of metadata catalogs is planned for release in September, 2003. The SRB system is in production use in multiple projects, from high-energy physics, to astronomy, to earth systems science, to bio-informatics. The SCEC community library will be based on the definition of standard metadata attributes, the creation of logical collections within the SRB, the creation of access services, and the demonstration of a preservation environment. The use of the SRB for the SCEC digital library will sustain the expected collection size and collection capabilities.

  18. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  19. The COMPASS Project

    NASA Astrophysics Data System (ADS)

    Duley, A. R.; Sullivan, D.; Fladeland, M. M.; Myers, J.; Craig, M.; Enomoto, F.; Van Gilst, D. P.; Johan, S.

    2011-12-01

    The Common Operations and Management Portal for Airborne Science Systems (COMPASS) project is a multi-center collaborative effort to advance and extend the research capabilities of the National Aeronautics and Space Administration's (NASA) Airborne Science Program (ASP). At its most basic, COMPASS provides tools for visualizing the position of aircraft and instrument observations during the course of a mission, and facilitates dissemination, discussion, and analysis and of multiple disparate data sources in order to more efficiently plan and execute airborne science missions. COMPASS targets a number of key objectives. First, deliver a common operating picture for improved shared situational awareness to all participants in NASA's Airborne Science missions. These participants include scientists, engineers, managers, and the general public. Second, encourage more responsive and collaborative measurements between instruments on multiple aircraft, satellites, and on the surface in order to increase the scientific value of these measurements. Fourth, provide flexible entry points for data providers to supply model and advanced analysis products to mission team members. Fifth, provide data consumers with a mechanism to ingest, search and display data products. Finally, embrace an open and transparent platform where common data products, services, and end user components can be shared with the broader scientific community. In pursuit of these objectives, and in concert with requirements solicited by the airborne science research community, the COMPASS project team has delivered a suite of core tools intended to represent the next generation toolset for airborne research. This toolset includes a collection of loosely coupled RESTful web-services, a system to curate, register, and search, commonly used data sources, end-user tools which leverage web socket and other next generation HTML5 technologies to aid real time aircraft position and data visualization, and an extensible a framework to rapidly accommodate mission specific requirements and mission tools.

  20. Nurse managers' challenges in project management.

    PubMed

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  1. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  2. Effectiveness of a systematic approach to promote intersectoral collaboration in comprehensive school health promotion-a multiple-case study using quantitative and qualitative data.

    PubMed

    Pucher, Katharina K; Candel, Math J J M; Krumeich, Anja; Boot, Nicole M W M; De Vries, Nanne K

    2015-07-05

    We report on the longitudinal quantitative and qualitative data resulting from a two-year trajectory (2008-2011) based on the DIagnosis of Sustainable Collaboration (DISC) model. This trajectory aimed to support regional coordinators of comprehensive school health promotion (CSHP) in systematically developing change management and project management to establish intersectoral collaboration. Multilevel analyses of quantitative data on the determinants of collaborations according to the DISC model were done, with 90 respondents (response 57 %) at pretest and 69 respondents (52 %) at posttest. Nvivo analyses of the qualitative data collected during the trajectory included minutes of monthly/bimonthly personal/telephone interviews (N = 65) with regional coordinators, and documents they produced about their activities. Quantitative data showed major improvements in change management and project management. There were also improvements in consensus development, commitment formation, formalization of the CSHP, and alignment of policies, although organizational problems within the collaboration increased. Content analyses of qualitative data identified five main management styles, including (1) facilitating active involvement of relevant parties; (2) informing collaborating parties; (3) controlling and (4) supporting their task accomplishment; and (5) coordinating the collaborative processes. We have contributed to the fundamental understanding of the development of intersectoral collaboration by combining qualitative and quantitative data. Our results support a systematic approach to intersectoral collaboration using the DISC model. They also suggest five main management styles to improve intersectoral collaboration in the initial stage. The outcomes are useful for health professionals involved in similar ventures.

  3. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  4. Multiple Intelligences: Curriculum and Assessment Project. Final Report

    ERIC Educational Resources Information Center

    Hyland, Aine, Ed.

    2011-01-01

    The "Multiple Intelligences, Curriculum and Assessment Project" at University College Cork was a collaborative project carried out between 1995 and 1999. The key research question focused on whether Howard Gardner's theory of Multiple Intelligences could be applied to, and enhance, aspects of curriculum and assessment at primary and…

  5. Managing hydrological measurements for small and intermediate projects: RObsDat

    NASA Astrophysics Data System (ADS)

    Reusser, Dominik E.

    2014-05-01

    Hydrological measurements need good management for the data not to be lost. Multiple, often overlapping files from various loggers with heterogeneous formats need to be merged. Data needs to be validated and cleaned and subsequently converted to the format for the hydrological target application. Preferably, all these steps should be easily tracable. RObsDat is an R package designed to support such data management. It comes with a command line user interface to support hydrologists to enter and adjust their data in a database following the Observations Data Model (ODM) standard by QUASHI. RObsDat helps in the setup of the database within one of the free database engines MySQL, PostgreSQL or SQLite. It imports the controlled water vocabulary from the QUASHI web service and provides a smart interface between the hydrologist and the database: Already existing data entries are detected and duplicates avoided. The data import function converts different data table designes to make import simple. Cleaning and modifications of data are handled with a simple version control system. Variable and location names are treated in a user friendly way, accepting and processing multiple versions. A new development is the use of spacetime objects for subsequent processing.

  6. Future scenarios of impacts to ecosystem services on California rangelands

    USGS Publications Warehouse

    Byrd, Kristin; Alvarez, Pelayo; Flint, Lorraine; Flint, Alan

    2014-01-01

    The 18 million acres of rangelands in the Central Valley of California provide multiple benefits or “ecosystem services” to people—including wildlife habitat, water supply, open space, recreation, and cultural resources. Most of this land is privately owned and managed for livestock production. These rangelands are vulnerable to land-use conversion and climate change. To help resource managers assess the impacts of land-use change and climate change, U.S. Geological Survey scientists and their cooperators developed scenarios to quantify and map changes to three main rangeland ecosystem services—wildlife habitat, water supply, and carbon sequestration. Project results will help prioritize strategies to conserve these rangelands and the ecosystem services that they provide.

  7. Organizing "mountains of words" for data analysis, both qualitative and quantitative.

    PubMed

    Johnson, Bruce D; Dunlap, Eloise; Benoit, Ellen

    2010-04-01

    Qualitative research creates mountains of words. U.S. federal funding supports mostly structured qualitative research, which is designed to test hypotheses using semiquantitative coding and analysis. This article reports on strategies for planning, organizing, collecting, managing, storing, retrieving, analyzing, and writing about qualitative data so as to most efficiently manage the mountains of words collected in large-scale ethnographic projects. Multiple benefits accrue from this approach. Field expenditures are linked to units of work so productivity is measured, many staff in various locations have access to use and analyze the data, quantitative data can be derived from data that is primarily qualitative, and improved efficiencies of resources are developed.

  8. Automatic HDL firmware generation for FPGA-based reconfigurable measurement and control systems with mezzanines in FMC standard

    NASA Astrophysics Data System (ADS)

    Wojenski, Andrzej; Kasprowicz, Grzegorz; Pozniak, Krzysztof T.; Romaniuk, Ryszard

    2013-10-01

    The paper describes a concept of automatic firmware generation for reconfigurable measurement systems, which uses FPGA devices and measurement cards in FMC standard. Following sections are described in details: automatic HDL code generation for FPGA devices, automatic communication interfaces implementation, HDL drivers for measurement cards, automatic serial connection between multiple measurement backplane boards, automatic build of memory map (address space), automatic generated firmware management. Presented solutions are required in many advanced measurement systems, like Beam Position Monitors or GEM detectors. This work is a part of a wider project for automatic firmware generation and management of reconfigurable systems. Solutions presented in this paper are based on previous publication in SPIE.

  9. From industry to academia: Benefits of integrating a professional project management standard into (geo)science research

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa

    2017-04-01

    Scientific and technological research carried out within universities and public research institutions often involves large collaborations across several countries. Despite the considerable budget (typically millions of Euros), the high expectations (high impact scientific findings, new technological developments and links with policy makers, industry and civil society) and the length of the project over several years, these international projects often rely heavily on the personal skills of the management team (project coordinator, project manager, principal investigators) without a structured, transferable framework. While this approach has become an established practice, it's not ideal and can jeopardise the success of the entire effort with consequences ranging from schedule delays, loss of templates/systems, financial charges and ultimately project failure. In this presentation I will show the advantages of integrating a globally recognised standard for professional project management, such as the PMP® by the Project Management Institute, into academic research. I will cover the project management knowledge areas (integration management, scope management, time management, cost management, quality management, human resources management, risk management, procurement management, and stakeholder management) and the processes within these throughout the phases of the project lifetime (project initiation, planning, executing, monitoring and controlling, and closure). I will show how application of standardised, transferable procedures, developed within the business & administration sector, can benefit academia and more generally scientific research.

  10. Making climate change projections relevant to water management: opportunities and challenges in the Colorado River basin (Invited)

    NASA Astrophysics Data System (ADS)

    Vano, J. A.

    2013-12-01

    By 2007, motivated by the ongoing drought and release of new climate model projections associated with the IPCC AR4 report, multiple independent studies had made estimates of future Colorado River streamflow. Each study had a unique approach, and unique estimate for the magnitude for mid-21st century streamflow change ranging from declines of only 6% to declines of as much as 45%. The differences among studies provided for interesting scientific debates, but to many practitioners this appeared to be just a tangle of conflicting predictions, leading to the question 'why is there such a wide range of projections of impacts of future climate change on Colorado River streamflow, and how should this uncertainty be interpreted?' In response, a group of scientists from academic and federal agencies, brought together through a NOAA cross-RISA project, set forth to identify the major sources of disparities and provide actionable science and guidance for water managers and decision makers. Through this project, four major sources of disparities among modeling studies were identified that arise from both methodological and model differences. These differences, in order of importance, are: (1) the Global Climate Models (GCMs) and emission scenarios used; (2) the ability of land surface hydrology and atmospheric models to simulate properly the high elevation runoff source areas; (3) the sensitivities of land surface hydrology models to precipitation and temperature changes; and (4) the methods used to statistically downscale GCM scenarios. Additionally, reconstructions of pre-instrumental streamflows provided further insights about the greatest risk to Colorado River streamflow of a multi-decadal drought, like those observed in paleo reconstructions, exacerbated by a steady reduction in flows due to climate change. Within this talk I will provide an overview of these findings and insights into the opportunities and challenges encountered in the process of striving to make climate change projections more useful to water managers and decision makers.

  11. Mapping Application for Penguin Populations and Projected Dynamics (MAPPPD): Data and Tools for Dynamic Management and Decision Support

    NASA Technical Reports Server (NTRS)

    Humphries, G. R. W.; Naveen, R.; Schwaller, M.; Che-Castaldo, C.; McDowall, P.; Schrimpf, M.; Schrimpf, Michael; Lynch, H. J.

    2017-01-01

    The Mapping Application for Penguin Populations and Projected Dynamics (MAPPPD) is a web-based, open access, decision-support tool designed to assist scientists, non-governmental organizations and policy-makers working to meet the management objectives as set forth by the Commission for the Conservation of Antarctic Marine Living Resources (CCAMLR) and other components of the Antarctic Treaty System (ATS) (that is, Consultative Meetings and the ATS Committee on Environmental Protection). MAPPPD was designed specifically to complement existing efforts such as the CCAMLR Ecosystem Monitoring Program (CEMP) and the ATS site guidelines for visitors. The database underlying MAPPPD includes all publicly available (published and unpublished) count data on emperor, gentoo, Adelie) and chinstrap penguins in Antarctica. Penguin population models are used to assimilate available data into estimates of abundance for each site and year.Results are easily aggregated across multiple sites to obtain abundance estimates over any user-defined area of interest. A front end web interface located at www.penguinmap.com provides free and ready access to the most recent count and modelled data, and can act as a facilitator for data transfer between scientists and Antarctic stakeholders to help inform management decisions for the continent.

  12. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    ERIC Educational Resources Information Center

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  13. Center for Ground Vehicle Development and Integration

    DTIC Science & Technology

    2011-04-22

    UNCLASSIFIED OPSEC# 21798 CGVDI Organizational Chart CGVDI Director Project and Operations Management Project Management Operations Management Engineered...Metals Welding Assembly / Paint UNCLASSIFIED UNCLASSIFIED OPSEC# 21798 Project and Operations Management CGVDI serves as a single entry point to RDECOM...for ground vehicle system integration projects, as well as for managing cost, schedule, performance and risk. Project Management Operations

  14. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  15. Analysis of interactions among barriers in project risk management

    NASA Astrophysics Data System (ADS)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  16. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  17. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  18. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  19. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  20. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  1. Managemant of NASA's major projects

    NASA Technical Reports Server (NTRS)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  2. Astronomical large projects managed with MANATEE: management tool for effective engineering

    NASA Astrophysics Data System (ADS)

    García-Vargas, M. L.; Mujica-Alvarez, E.; Pérez-Calpena, A.

    2012-09-01

    This paper describes MANATEE, which is the Management project web tool developed by FRACTAL, specifically designed for managing large astronomical projects. MANATEE facilitates the management by providing an overall view of the project and the capabilities to control the three main projects parameters: scope, schedule and budget. MANATEE is one of the three tools of the FRACTAL System & Project Suite, which is composed also by GECO (System Engineering Tool) and DOCMA (Documentation Management Tool). These tools are especially suited for those Consortia and teams collaborating in a multi-discipline, complex project in a geographically distributed environment. Our Management view has been applied successfully in several projects and currently is being used for Managing MEGARA, the next instrument for the GTC 10m telescope.

  3. Making decisions in complex landscapes: Headwater stream management across multiple federal agencies

    USGS Publications Warehouse

    Katz, Rachel; Grant, Evan H. Campbell; Runge, Michael C.; Connery, Bruce; Crockett, Marquette; Herland, Libby; Johnson, Sheela; Kirk, Dawn; Wofford, Jeb; Bennett, Rick; Nislow, Keith; Norris, Marian; Hocking, Daniel; Letcher, Benjamin; Roy, Allison

    2014-01-01

    Headwater stream ecosystems are vulnerable to numerous threats associated with climate and land use change. In the northeastern US, many headwater stream species (e.g., brook trout and stream salamanders) are of special conservation concern and may be vulnerable to climate change influences, such as changes in stream temperature and streamflow. Federal land management agencies (e.g., US Fish and Wildlife Service, National Park Service, USDA Forest Service, Bureau of Land Management and Department of Defense) are required to adopt policies that respond to climate change and may have longer-term institutional support to enforce such policies compared to state, local, non-governmental, or private land managers. However, federal agencies largely make management decisions in regards to headwater stream ecosystems independently. This fragmentation of management resources and responsibilities across the landscape may significantly impede the efficiency and effectiveness of conservation actions, and higher degrees of collaboration may be required to achieve conservation goals. This project seeks to provide an example of cooperative landscape decision-making to address the conservation of headwater stream ecosystems. We identified shared and contrasting objectives of each federal agency and potential collaboration opportunities that may increase efficient and effective management of headwater stream ecosystems in two northeastern US watersheds. These workshops provided useful insights into the adaptive capacity of federal institutions to address threats to headwater stream ecosystems. Our ultimate goal is to provide a decision-making framework and analysis that addresses large-scale conservation threats across multiple stakeholders, as a demonstration of cooperative landscape conservation for aquatic ecosystems. Additionally, we aim to provide new scientific knowledge and a regional perspective to resource managers to help inform local management decisions.

  4. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  5. Advanced Caution and Warning System, Final Report - 2011

    NASA Technical Reports Server (NTRS)

    Spirkovska, Lilly; Aaseng, Gordon; Iverson, David; McCann, Robert S.; Robinson, Peter; Dittemore, Gary; Liolios, Sotirios; Baskaran, Vijay; Johnson, Jeremy; Lee, Charles; hide

    2013-01-01

    The work described in this report is a continuation of the ACAWS work funded in fiscal year (FY) 2010 under the Exploration Technology Development Program (ETDP), Integrated Systems Health Management (ISHM) project. In FY 2010, we developed requirements for an ACAWS system and vetted the requirements with potential users via a concept demonstration system. In FY 2011, we developed a working prototype of aspects of that concept, with placeholders for technologies to be fully developed in future phases of the project. The objective is to develop general capability to assist operators with system health monitoring and failure diagnosis. Moreover, ACAWS was integrated with the Discrete Controls (DC) task of the Autonomous Systems and Avionics (ASA) project. The primary objective of DC is to demonstrate an electronic and interactive procedure display environment and multiple levels of automation (automatic execution by computer, execution by computer if the operator consents, and manual execution by the operator).

  6. Preliminary data on ASP2215: tolerability and efficacy in acute myeloid leukemia patients.

    PubMed

    Thom, Claire

    2015-09-01

    Claire Thom speaks to Gemma Westcott, Commissioning Editor: Claire Thom joined Astellas in 2013 as the Therapeutic Area Head for Oncology in Global Development. In that role, she also serves as the STAR leader for Oncology for Astellas. Prior to Astellas, she spent 12 years with Takeda. Her last position was Senior Vice President, Portfolio Management, Drug Development Management and Medical Informatics and Strategic Operations within the Medical Division (the Division within Millennium responsible for oncology clinical drug development within Takeda). During her 4 years at Millennium, at various times, she had responsibility within the Medical Division for leading portfolio management, business operations (medical finance, annual and mid-range financial planning, space planning and operations, headcount resourcing, development goals process), clinical development operations (clinical operations, programming, data management, statistics, medical writing, clinical outsourcing), drug development management (project management), medical informatics (technology support for the division) and the strategic project management office for the division. Prior to joining Millennium, Claire Thom spent 18 months working in Osaka, Japan, during which she was responsible for developing the oncology strategy for Takeda that culminated in the acquisition of Millennium. Before going to Japan, she held positions of varying responsibility within the Takeda US development organization including the management of regulatory affairs, safety, biometrics and data management, clinical research and quality assurance. Claire Thom has particular expertise in organizational design and efficiency; she has successfully worked through integrations across multiple functions and redesigned business processes. She has a PharmD from University of Illinois (IL, USA) and over 20 years of pharmaceutical experience including positions in medical affairs and new product planning (over 11 years at Searle) and drug development (over 12 years at Takeda/Millennium).

  7. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  8. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  9. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  13. Library roles in disaster response: an oral history project by the National Library of Medicine*†

    PubMed Central

    Featherstone, Robin M.; Lyon, Becky J.; Ruffin, Angela B.

    2008-01-01

    Objectives: To develop a knowledgebase of stories illustrating the variety of roles that librarians can assume in emergency and disaster planning, preparedness, response, and recovery, the National Library of Medicine conducted an oral history project during the summer of 2007. The history aimed to describe clearly and compellingly the activities—both expected and unusual—that librarians performed during and in the aftermath of the disasters. While various types of libraries were included in interviews, the overall focus of the project was on elucidating roles for medical libraries. Methods: Using four broad questions as the basis for telephone and email interviews, the investigators recorded the stories of twenty-three North American librarians who responded to bombings and other acts of terrorism, earthquakes, epidemics, fires, floods, hurricanes, and tornados. Results: Through the process of conducting the oral history, an understanding of multiple roles for libraries in disaster response emerged. The roles fit into eight categories: institutional supporters, collection managers, information disseminators, internal planners, community supporters, government partners, educators and trainers, and information community builders. Conclusions: Librarians—particularly health sciences librarians—made significant contributions to preparedness and recovery activities surrounding recent disasters. Lessons learned from the oral history project increased understanding of and underscored the value of collaborative relationships between libraries and local, state, and federal disaster management agencies and organizations. PMID:18974811

  14. NBII-SAIN Data Management Toolkit

    USGS Publications Warehouse

    Burley, Thomas E.; Peine, John D.

    2009-01-01

    The Strategic Plan for the U.S. Geological Survey Biological Informatics Program (2005-2009) recognizes the need for effective data management: Though the Federal government invests more than $600 million per year in biological data collection, it is difficult to address these issues because of limited accessibility and lack of standards for data and information...variable quality, sources, methods, and formats (for example observations in the field, museum specimens, and satellite images) present additional challenges. This is further complicated by the fast-moving target of emerging and changing technologies such as GPS and GIS. Even though these technologies offer new solutions, they also create new informatics challenges (Ruggiero and others, 2005). The USGS National Biological Information Infrastructure program, hereafter referred to as NBII, is charged with the mission to improve the way data and information are gathered, documented, stored, and accessed. The central objective of this project is a direct reflection of the purpose of NBII as described by John Mosesso, Program Manager of the U.S. Geological Survey-Biological Informatics Program-GAP Analysis: At the outset, the reason for bringing about NBII was that there were significant amounts of data and information scattered all over the U.S., not accessible, in incompatible formats, and that NBII was tasked with addressing this problem...NBII's focus is to pull data together that truly matters to someone or communities. Essentially, the core questions are: 1) what are the issues, 2) where is the data, and 3) how can we make it usable and accessible (John Mosesso, U.S. Geological Survey, oral commun., 2006). Redundancy in data collection can be a major issue when multiple stakeholders are involved with a common effort. In 2001 the U.S. General Accounting Office (USGAO) estimated that about 50 percent of the Federal government's geospatial data at the time was redundant. In addition, approximately 80 percent of the cost of a spatial information system is associated with spatial data collection and management (U.S. General Accounting Office, 2003). These figures indicate that the resources (time, personnel, money) of many agencies and organizations could be used more efficiently and effectively. Dedicated and conscientious data management coordination and documentation is critical for reducing such redundancy. Substantial cost savings and increased efficiency are direct results of a pro-active data management approach. In addition, details of projects as well as data and information are frequently lost as a result of real-world occurrences such as the passing of time, job turnover, and equipment changes and failure. A standardized, well documented database allows resource managers to identify issues, analyze options, and ultimately make better decisions in the context of adaptive management (National Land and Water Resources Audit and the Australia New Zealand Land Information Council on behalf of the Australian National Government, 2003). Many environmentally focused, scientific, or natural resource management organizations collect and create both spatial and non-spatial data in some form. Data management appropriate for those data will be contingent upon the project goal(s) and objectives and thus will vary on a case-by-case basis. This project and the resulting Data Management Toolkit, hereafter referred to as the Toolkit, is therefore not intended to be comprehensive in terms of addressing all of the data management needs of all projects that contain biological, geospatial, and other types of data. The Toolkit emphasizes the idea of connecting a project's data and the related management needs to the defined project goals and objectives from the outset. In that context, the Toolkit presents and describes the fundamental components of sound data and information management that are common to projects involving biological, geospatial, and other related data

  15. Thermal management of VECSELs by front surface direct liquid cooling

    NASA Astrophysics Data System (ADS)

    Smyth, Conor J. C.; Mirkhanov, Shamil; Quarterman, Adrian H.; Wilcox, Keith G.

    2016-03-01

    Efficient thermal management is vital for VECSELs, affecting the output power and several aspects of performance of the device. Presently there exist two distinct methods of effective thermal management which both possess their merits and disadvantages. Substrate removal of the VECSEL gain chip has proved a successful method in devices emitting at a wavelength near 1μm. However for other wavelengths the substrate removal technique has proved less effective primarily due to the thermal impedance of the distributed Bragg reflectors. The second method of thermal management involves the use of crystalline heat spreaders bonded to the gain chip surface. Although this is an effective thermal management scheme, the disadvantages are additional loss and the etalon effect that filters the gain spectrum, making mode locking more difficult and normally resulting in multiple peaks in the spectrum. There are considerable disadvantages associated with both methods attributed to heatspreader cost and sample processing. It is for these reasons that a proposed alternative, front surface liquid cooling, has been investigated in this project. Direct liquid cooling involves flowing a temperature-controlled liquid over the sample's surface. In this project COMSOL was used to model surface liquid cooling of a VECSEL sample in order to investigate and compare its potential thermal management with current standard thermal management techniques. Based on modelling, experiments were carried out in order to evaluate the performance of the technique. While modelling suggests that this is potentially a mid-performance low cost alternative to existing techniques, experimental measurements to date do not reflect the performance predicted from modelling.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beutler, Joshua; Cole, Jr., Edward I.; Smith, Norman F.

    This project investigated a recently patented Sandia technology known as visible light Laser Voltage Probing (LVP). In this effort we carefully prepared well understood and characterized samples for testing. These samples were then operated across a range of configurations to minimize the possibility of superposition of multiple photon carrier interactions as data was taken with conventional and visible light LVP systems. Data consisted of LVP waveforms and Laser Voltage Images (LVI). Visible light (633 nm) LVP data was compared against 1319 nm and 1064 nm conventional LVP data to better understand the similarities and differences in mechanisms for all wavelengthsmore » of light investigated. The full text can be obtained by reaching the project manager, Ed Cole or the Cyber IA lead, Justin Ford.« less

  17. Modelling of Tethered Space-Web Structures

    NASA Astrophysics Data System (ADS)

    McKenzie, D. J.; Cartnell, M. P.

    Large structures in space are an essential milestone in the path of many projects, from solar power collectors to space stations. In space, as on Earth, these large projects may be split up into more manageable sections, dividing the task into multiple replicable parts. Specially constructed spider robots could assemble these structures piece by piece over a membrane or space- web, giving a method for building a structure while on orbit. The modelling and applications of these space-webs are discussed, along with the derivation of the equations of motion of the structure. The presentation of some preliminary results from the solution of these equations will show that space-webs can take a variety of different forms, and give some guidelines for configuring the space-web system.

  18. The Ensembl Web Site: Mechanics of a Genome Browser

    PubMed Central

    Stalker, James; Gibbins, Brian; Meidl, Patrick; Smith, James; Spooner, William; Hotz, Hans-Rudolf; Cox, Antony V.

    2004-01-01

    The Ensembl Web site (http://www.ensembl.org/) is the principal user interface to the data of the Ensembl project, and currently serves >500,000 pages (∼2.5 million hits) per week, providing access to >80 GB (gigabyte) of data to users in more than 80 countries. Built atop an open-source platform comprising Apache/mod_perl and the MySQL relational database management system, it is modular, extensible, and freely available. It is being actively reused and extended in several different projects, and has been downloaded and installed in companies and academic institutions worldwide. Here, we describe some of the technical features of the site, with particular reference to its dynamic configuration that enables it to handle disparate data from multiple species. PMID:15123591

  19. The Ensembl Web site: mechanics of a genome browser.

    PubMed

    Stalker, James; Gibbins, Brian; Meidl, Patrick; Smith, James; Spooner, William; Hotz, Hans-Rudolf; Cox, Antony V

    2004-05-01

    The Ensembl Web site (http://www.ensembl.org/) is the principal user interface to the data of the Ensembl project, and currently serves >500,000 pages (approximately 2.5 million hits) per week, providing access to >80 GB (gigabyte) of data to users in more than 80 countries. Built atop an open-source platform comprising Apache/mod_perl and the MySQL relational database management system, it is modular, extensible, and freely available. It is being actively reused and extended in several different projects, and has been downloaded and installed in companies and academic institutions worldwide. Here, we describe some of the technical features of the site, with particular reference to its dynamic configuration that enables it to handle disparate data from multiple species.

  20. Baseline practices and user needs for Web dissemination of geotechnical data

    USGS Publications Warehouse

    Turner, L.L.; Brown, M.P.; Chambers, D.; Davis, C.A.; Diehl, J.; Hitchcock, C.S.; Holzer, T.L.; Nigbor, R.L.; Plumb, C.; Real, C.; Reimer, M.; Steidl, J.H.; Sun, J.I.; Tinsley, J.C.; Vaughn, D.; ,

    2004-01-01

    This paper presents the findings and recommendations of the User Scenario Work Group (USWG) in identifying a baseline of current practices within the geo-professional community and prioritizing desired functional requirements in the development of a comprehensive geotechnical information management system. This work was conducted as an initial phase of a larger project to demonstrate the effectiveness of a web based virtual data center for the dissemination of geotechnical data from multiple linked databases of various government and private sector organizations. An online survey was administered over the course of several months to practitioners across the nation. The results from the survey were compiled and examined to provide direction to the other project teams in the development of user-driven prototype data system.

  1. Making grandma's data secure: a security architecture for home telemedicine.

    PubMed Central

    Starren, J.; Sengupta, S.; Hripcsak, G.; Ring, G.; Klerer, R.; Shea, S.

    2001-01-01

    Home telemedicine presents special challenges for data security and privacy. Experience in the Informatics for Diabetes Education And Telemedicine (IDEATel) project has demonstrated that data security is not a one-size-fits-all problem. The IDEATel users include elderly patients in their homes, nurse case managers, physicians, and researchers. The project supports multiple computer systems that require a variety of user interactions, including: data entry, data review, patient education, videoconferencing, and electronic monitoring. To meet these various needs, a number of different of security solutions were utilized, including: UserID/Password, PKI certificates, time-based tokens, IP filtering, VPNs, symmetric and asymmetric encryption schemes, firewalls and dedicated connections. These were combined in different ways to meet the needs of each user groups. PMID:11825267

  2. Telehealth on advanced networks.

    PubMed

    Wilson, Laurence S; Stevenson, Duncan R; Cregan, Patrick

    2010-01-01

    We address advanced Internet for complex telehealth applications by reviewing four hospital-based broadband telehealth projects and identifying common threads. These projects were conducted in Australia under a 6-year research project on broadband Internet applications. Each project addressed specific clinical needs and its development was guided by the clinicians involved. Each project was trialed in the field and evaluated against the initial requirements. The four projects covered remote management of a resuscitation team in a district hospital, remote guidance and interpretation of echocardiography, virtual-reality-based instructor-student surgical training, and postoperative outpatient consultations following pediatric surgery. Each was characterized by a high level of interpersonal communication, a high level of clinical expertise, and multiple participants. Each made use of multiple high-quality video and audio links and shared real-time access to clinical data. Four common threads were observed. Each application provided a high level of usability and task focus because the design and use of broadband capability was aimed directly to meet the clinicians' needs. Each used the media quality available over broadband to convey words, gestures, body movements, and facial expressions to support communication and a sense of presence among the participants. Each required a complex information space shared among the participants, including real-time access to stored patient data and real-time interactive access to the patients themselves. Finally, each application supported the social and organizational aspects of their healthcare focus, creating and maintaining relationships between the various participants, and this was done by placing the telehealth application into a wider functioning clinical context. These findings provide evidence for a significantly enhanced role for appropriate telemedicine systems running on advanced networks, in a wider range of clinical applications, more deeply integrated into healthcare systems.

  3. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  4. Cost/Schedule Control Systems Criteria: A Reference Guide to C/SCSC information

    DTIC Science & Technology

    1992-09-01

    Smith, Larry A. "Mainframe ARTEMIS: More than a Project Management Tool -- Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988...A. "Mainframe ARTEMIS: More than a Project Management Tool - Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988). 14...than a Project Management Tool -- Earned Value Analysis ( PEVA )," Project Management Journal, 19:23-28 (April 1988). 17. Trufant, Thomas M. and Robert

  5. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    ERIC Educational Resources Information Center

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  6. Appreciating the Complexity of Project Management Execution: Using Simulation in the Classroom

    ERIC Educational Resources Information Center

    Hartman, Nathan S.; Watts, Charles A.; Treleven, Mark D.

    2013-01-01

    As the popularity and importance of project management increase, so does the need for well-prepared project managers. This article discusses our experiences using a project management simulation in undergraduate and MBA classes to help students better grasp the complexity of project management. This approach gives students hands-on experience with…

  7. Uncertainty and extreme events in future climate and hydrologic projections for the Pacific Northwest: providing a basis for vulnerability and core/corridor assessments

    USGS Publications Warehouse

    Littell, Jeremy S.; Mauger, Guillaume S.; Salathe, Eric P.; Hamlet, Alan F.; Lee, Se-Yeun; Stumbaugh, Matt R.; Elsner, Marketa; Norheim, Robert; Lutz, Eric R.; Mantua, Nathan J.

    2014-01-01

    The purpose of this project was to (1) provide an internally-consistent set of downscaled projections across the Western U.S., (2) include information about projection uncertainty, and (3) assess projected changes of hydrologic extremes. These objectives were designed to address decision support needs for climate adaptation and resource management actions. Specifically, understanding of uncertainty in climate projections – in particular for extreme events – is currently a key scientific and management barrier to adaptation planning and vulnerability assessment. The new dataset fills in the Northwest domain to cover a key gap in the previous dataset, adds additional projections (both from other global climate models and a comparison with dynamical downscaling) and includes an assessment of changes to flow and soil moisture extremes. This new information can be used to assess variations in impacts across the landscape, uncertainty in projections, and how these differ as a function of region, variable, and time period. In this project, existing University of Washington Climate Impacts Group (UW CIG) products were extended to develop a comprehensive data archive that accounts (in a reigorous and physically based way) for climate model uncertainty in future climate and hydrologic scenarios. These products can be used to determine likely impacts on vegetation and aquatic habitat in the Pacific Northwest (PNW) region, including WA, OR, ID, northwest MT to the continental divide, northern CA, NV, UT, and the Columbia Basin portion of western WY New data series and summaries produced for this project include: 1) extreme statistics for surface hydrology (e.g. frequency of soil moisture and summer water deficit) and streamflow (e.g. the 100-year flood, extreme 7-day low flows with a 10-year recurrence interval); 2) snowpack vulnerability as indicated by the ratio of April 1 snow water to cool-season precipitation; and, 3) uncertainty analyses for multiple climate scenarios.

  8. Implementing the Patient-Centered Medical Home: Observation and Description of the National Demonstration Project

    PubMed Central

    Stewart, Elizabeth E.; Nutting, Paul A.; Crabtree, Benjamin F.; Stange, Kurt C.; Miller, William L.; Jaén, Carlos Roberto

    2010-01-01

    PURPOSE We provide an overall description of the National Demonstration Project (NDP) intervention to transform family practices into patient-centered medical homes. METHODS An independent evaluation team used multiple data sources and methods to describe the design and implementation of the NDP. These included direct observation of the implementation team and project meetings, site visits to practices, depth interviews with practice members and implementation team members, access to practice communications (eg, telephone calls, e-mails), and public domain materials (eg, the NDP Web site). RESULTS The American Academy of Family Physicians created a new division called TransforMED, which launched the 24-month NDP in June 2006. From 337 family medicine practices completing an extensive online application, 36 were selected and randomized to a facilitated group, which received tailored, intensive assistance and services from TransforMED, or a self-directed group, which received very limited assistance. Three facilitators from diverse backgrounds in finance, practice management, and organizational psychology used multiple practice change strategies including site visits, e-mails, metrics, and learning sessions. The self-directed practices worked primarily on their own, but self-organized a retreat midway through the project. The intervention model for the project evolved to be consistent with the emerging national consensus principles of the patient-centered medical home. The independent evaluation team studied the NDP and provided ongoing feedback to inform the implementation process. CONCLUSIONS The NDP illustrates that complex practice change interventions must combine flexibility in the intervention model, implementation strategy, and the evaluation, in order to maximize ongoing learning. PMID:20530392

  9. Implementing the patient-centered medical home: observation and description of the national demonstration project.

    PubMed

    Stewart, Elizabeth E; Nutting, Paul A; Crabtree, Benjamin F; Stange, Kurt C; Miller, William L; Jaén, Carlos Roberto

    2010-01-01

    We provide an overall description of the National Demonstration Project (NDP) intervention to transform family practices into patient-centered medical homes. An independent evaluation team used multiple data sources and methods to describe the design and implementation of the NDP. These included direct observation of the implementation team and project meetings, site visits to practices, depth interviews with practice members and implementation team members, access to practice communications (eg, telephone calls, e-mails), and public domain materials (eg, the NDP Web site). The American Academy of Family Physicians created a new division called TransforMED, which launched the 24-month NDP in June 2006. From 337 family medicine practices completing an extensive online application, 36 were selected and randomized to a facilitated group, which received tailored, intensive assistance and services from TransforMED, or a self-directed group, which received very limited assistance. Three facilitators from diverse backgrounds in finance, practice management, and organizational psychology used multiple practice change strategies including site visits, e-mails, metrics, and learning sessions. The self-directed practices worked primarily on their own, but self-organized a retreat midway through the project. The intervention model for the project evolved to be consistent with the emerging national consensus principles of the patient-centered medical home. The independent evaluation team studied the NDP and provided ongoing feedback to inform the implementation process. The NDP illustrates that complex practice change interventions must combine flexibility in the intervention model, implementation strategy, and the evaluation, in order to maximize ongoing learning.

  10. Providing the Persistent Data Storage in a Software Engineering Environment Using Java/COBRA and a DBMS

    NASA Technical Reports Server (NTRS)

    Dhaliwal, Swarn S.

    1997-01-01

    An investigation was undertaken to build the software foundation for the WHERE (Web-based Hyper-text Environment for Requirements Engineering) project. The TCM (Toolkit for Conceptual Modeling) was chosen as the foundation software for the WHERE project which aims to provide an environment for facilitating collaboration among geographically distributed people involved in the Requirements Engineering process. The TCM is a collection of diagram and table editors and has been implemented in the C++ programming language. The C++ implementation of the TCM was translated into Java in order to allow the editors to be used for building various functionality of the WHERE project; the WHERE project intends to use the Web as its communication back- bone. One of the limitations of the translated software (TcmJava), which militated against its use in the WHERE project, was persistent data management mechanisms which it inherited from the original TCM; it was designed to be used in standalone applications. Before TcmJava editors could be used as a part of the multi-user, geographically distributed applications of the WHERE project, a persistent storage mechanism must be built which would allow data communication over the Internet, using the capabilities of the Web. An approach involving features of Java, CORBA (Common Object Request Broker), the Web, a middle-ware (Java Relational Binding (JRB)), and a database server was used to build the persistent data management infrastructure for the WHERE project. The developed infrastructure allows a TcmJava editor to be downloaded and run from a network host by using a JDK 1.1 (Java Developer's Kit) compatible Web-browser. The aforementioned editor establishes connection with a server by using the ORB (Object Request Broker) software and stores/retrieves data in/from the server. The server consists of a CORBA object or objects depending upon whether the data is to be made persistent on a single server or multiple servers. The CORBA object providing the persistent data server is implemented using the Java progranu-ning language. It uses the JRB to store/retrieve data in/from a relational database server. The persistent data management system provides transaction and user management facilities which allow multi-user, distributed access to the stored data in a secure manner.

  11. Customized laboratory information management system for a clinical and research leukemia cytogenetics laboratory.

    PubMed

    Bakshi, Sonal R; Shukla, Shilin N; Shah, Pankaj M

    2009-01-01

    We developed a Microsoft Access-based laboratory management system to facilitate database management of leukemia patients referred for cytogenetic tests in regards to karyotyping and fluorescence in situ hybridization (FISH). The database is custom-made for entry of patient data, clinical details, sample details, cytogenetics test results, and data mining for various ongoing research areas. A number of clinical research laboratoryrelated tasks are carried out faster using specific "queries." The tasks include tracking clinical progression of a particular patient for multiple visits, treatment response, morphological and cytogenetics response, survival time, automatic grouping of patient inclusion criteria in a research project, tracking various processing steps of samples, turn-around time, and revenue generated. Since 2005 we have collected of over 5,000 samples. The database is easily updated and is being adapted for various data maintenance and mining needs.

  12. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  13. The impacts of climate, land use, and demography on fires during the 21st century simulated by CLM-CN

    NASA Astrophysics Data System (ADS)

    Kloster, S.; Mahowald, N. M.; Randerson, J. T.; Lawrence, P. J.

    2012-01-01

    Landscape fires during the 21st century are expected to change in response to multiple agents of global change. Important controlling factors include climate controls on the length and intensity of the fire season, fuel availability, and fire management, which are already anthropogenically perturbed today and are predicted to change further in the future. An improved understanding of future fires will contribute to an improved ability to project future anthropogenic climate change, as changes in fire activity will in turn impact climate. In the present study we used a coupled-carbon-fire model to investigate how changes in climate, demography, and land use may alter fire emissions. We used climate projections following the SRES A1B scenario from two different climate models (ECHAM5/MPI-OM and CCSM) and changes in population. Land use and harvest rates were prescribed according to the RCP 45 scenario. In response to the combined effect of all these drivers, our model estimated, depending on our choice of climate projection, an increase in future (2075-2099) fire carbon emissions by 17 and 62% compared to present day (1985-2009). The largest increase in fire emissions was predicted for Southern Hemisphere South America for both climate projections. For Northern Hemisphere Africa, a region that contributed significantly to the global total fire carbon emissions, the response varied between a decrease and an increase depending on the climate projection. We disentangled the contribution of the single forcing factors to the overall response by conducting an additional set of simulations in which each factor was individually held constant at pre-industrial levels. The two different projections of future climate change evaluated in this study led to increases in global fire carbon emissions by 22% (CCSM) and 66% (ECHAM5/MPI-OM). The RCP 45 projection of harvest and land use led to a decrease in fire carbon emissions by -5%. The RCP 26 and RCP 60 harvest and landuse projections caused decreases around -20%. Changes in human ignition led to an increase of 20%. When we also included changes in fire management efforts to suppress fires in densely populated areas, global fire carbon emission decreased by -6% in response to changes in population density. We concluded from this study that changes in fire emissions in the future are controlled by multiple interacting factors. Although changes in climate led to an increase in future fire emissions this could be globally counterbalanced by coupled changes in land use, harvest, and demography.

  14. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  15. Two graphical user interfaces for managing and analyzing MODFLOW groundwater-model scenarios

    USGS Publications Warehouse

    Banta, Edward R.

    2014-01-01

    Scenario Manager and Scenario Analyzer are graphical user interfaces that facilitate the use of calibrated, MODFLOW-based groundwater models for investigating possible responses to proposed stresses on a groundwater system. Scenario Manager allows a user, starting with a calibrated model, to design and run model scenarios by adding or modifying stresses simulated by the model. Scenario Analyzer facilitates the process of extracting data from model output and preparing such display elements as maps, charts, and tables. Both programs are designed for users who are familiar with the science on which groundwater modeling is based but who may not have a groundwater modeler’s expertise in building and calibrating a groundwater model from start to finish. With Scenario Manager, the user can manipulate model input to simulate withdrawal or injection wells, time-variant specified hydraulic heads, recharge, and such surface-water features as rivers and canals. Input for stresses to be simulated comes from user-provided geographic information system files and time-series data files. A Scenario Manager project can contain multiple scenarios and is self-documenting. Scenario Analyzer can be used to analyze output from any MODFLOW-based model; it is not limited to use with scenarios generated by Scenario Manager. Model-simulated values of hydraulic head, drawdown, solute concentration, and cell-by-cell flow rates can be presented in display elements. Map data can be represented as lines of equal value (contours) or as a gradated color fill. Charts and tables display time-series data obtained from output generated by a transient-state model run or from user-provided text files of time-series data. A display element can be based entirely on output of a single model run, or, to facilitate comparison of results of multiple scenarios, an element can be based on output from multiple model runs. Scenario Analyzer can export display elements and supporting metadata as a Portable Document Format file.

  16. Hydrometric, Hydrochemical, and Hydrogeophysical Runoff Characterization Across Multiple Land Covers in the Agua Salud Project, Panama

    NASA Astrophysics Data System (ADS)

    Litt, Guy Finley

    As the Panama Canal Authority faces sensitivity to water shortages, managing water resources becomes crucial for the global shipping industry's security. These studies address knowledge gaps in tropical water resources to aid hydrological model development and validation. Field-based hydrological investigations in the Agua Salud Project within the Panama Canal Watershed employed multiple tools across a variety of land covers to investigate hydrological processes. Geochemical tracers informed where storm runoff in a stream comes from and identified electrical conductivity (EC) as an economical, high sample frequency tracer during small storms. EC-based hydrograph separation coupled with hydrograph recession rate analyses identified shallow and deep groundwater storage-discharge relationships that varied by season and land cover. A series of plot-scale electrical resistivity imaging geophysical experiments coupled with rainfall simulation characterized subsurface flow pathway behavior and quantified respectively increasing infiltration rates across pasture, 10 year old secondary succession forest, teak (tectona grandis), and 30 year old secondary succession forest land covers. Additional soil water, groundwater, and geochemical studies informed conceptual model development in subsurface flow pathways and groundwater, and identified future research needs.

  17. MABEL at IPAC: managing address books and email lists at the Infrared Processing and Analysis Center

    NASA Astrophysics Data System (ADS)

    Crane, Megan; Brinkworth, Carolyn; Gelino, Dawn; O'Leary, Ellen

    2012-09-01

    The Infrared Processing and Analysis Center (IPAC), located on the campus of the California Institute of Technology, is NASA's multi-mission data center for infrared astrophysics. Some of IPAC's services include administering data analysis funding awards to the astronomical community, organizing conferences and workshops, and soliciting and selecting fellowship and observing proposals. As most of these services are repeated annually or biannually, it becomes necessary to maintain multiple lists of email contacts associated with each service. MABEL is a PHP/MySQL web database application designed to facilitate this process. It serves as an address book containing up-to-date contact information for thousands of recipients. Recipients may be assigned to any number of email lists categorized by IPAC project and team. Lists may be public (viewable by all project members) or private (viewable only by team members). MABEL can also be used to send HTML or plain-text emails to multiple lists at once and prevents duplicate emails to a single recipient. This work was performed at the California Institute of Technology under contract to the National Aeronautics and Space Administration.

  18. Improving service user self-management: development and implementation of a strategy for the Richmond Response and Rehabilitation Team.

    PubMed

    Sanders, Julie; Fitzpatrick, Joanne M

    2017-01-01

    Community rapid response and rehabilitation teams are used to prevent avoidable hospital admissions for adults living with multiple long-term conditions and to support early hospital discharge by providing short-term intensive multidisciplinary support. Supporting self-management is an important service intervention if desired outcomes are to be achieved. A Care Quality Commission inspection of the Richmond Response and Rehabilitation Team in 2014 identified that self-management plans were not routinely developed with service users and reported this as requiring improvement. This quality improvement project aimed to develop and implement a self-management strategy for service users and for 90% of service users to have a personalised self-management plan within 3 months. The quality improvement intervention used the Plan-Do-Study-Act model comprising: (1) the development of a self-management plan, (2) staff education to support service users to self-manage using motivational interviewing techniques, (3) piloting the self-management plan with service users, (4) implementation of the self-management plan and (5) monthly audit and feedback. Evaluation involved an audit of the number and quality of self-management plans developed with service users and a survey of staff knowledge and confidence to support service users to self-manage. Following implementation of the intervention, the number of self-management plans developed in collaboration with service users increased from 0 to 187 over a 4-week period. Monthly audit data confirmed that this improvement has been sustained. Results indicated that staff knowledge and confidence improved after an education intervention. Quality improvement methods facilitated development and operationalisation of a self-management strategy by a community rapid response and rehabilitation team. The next phase of the project is to evaluate the impact of the self-management strategy on key service outcomes including self-efficacy, unplanned and emergency hospital admissions and early discharges.

  19. Dimensions of sustainability for a health communication intervention in African American churches: a multi-methods study.

    PubMed

    Scheirer, Mary Ann; Santos, Sherie Lou Z; Tagai, Erin K; Bowie, Janice; Slade, Jimmie; Carter, Roxanne; Holt, Cheryl L

    2017-03-28

    Sustainability of evidence-based health promotion interventions has received increased research attention in recent years. This paper reports sustainability data from Project HEAL (Health through Early Awareness and Learning) a cancer communication implementation trial about early detection, based in African American churches. In this paper, we used a framework by Scheirer and Dearing (Am J Publ Health 101:2059-2067, 2011) to evaluate multiple dimensions of sustainability from Project HEAL. We examined the following dimensions of sustainability: (a) continued benefits for intervention recipients, (b) continuation of intervention activities, c) maintaining community partnerships, (d) changes in organizational policies or structures, (e) sustained attention to the underlying issues, (f) diffusion to additional sites, or even (g) unplanned consequences of the intervention. Project HEAL provided a three-workshop cancer educational series delivered by trained lay peer community health advisors (CHAs) in their churches. Multiple sources of sustainability were collected at 12 and 24 months after the intervention that reflect several levels of analysis: participant surveys; interviews with CHAs; records from the project's management database; and open-ended comments from CHAs, staff, and community partners. Outcomes differ for each dimension of sustainability. For continued benefit, 39 and 37% of the initial 375 church members attended the 12- and 24-month follow-up workshops, respectively. Most participants reported sharing the information from Project HEAL with family or friends (92% at 12 months; 87% at 24 months). For continuation of intervention activities, some CHAs reported that the churches held at least one additional cancer educational workshop (33% at 12 months; 24% at 24 months), but many more CHAs reported subsequent health activities in their churches (71% at 12 months; 52% at 24 months). No church replicated the original series of three workshops. Additional data confirm the maintenance of community partnerships, some changes in church health policies, and continued attention to health issues by churches and CHAs. The multiple dimensions of sustainability require different data sources and levels of analysis and show varied sustainability outcomes in this project. The findings reinforce the dynamic nature of evidence-based health interventions in community contexts.

  20. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  1. 76 FR 12081 - Notice of Two-Year Continuation of Disease Management Demonstration Project for TRICARE Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Management Demonstration Project for TRICARE Standard Beneficiaries AGENCY: Department of Defense. ACTION: Notice of Two-Year Continuation of Disease Management Demonstration Project for TRICARE Standard... System (MHS) demonstration project entitled ``Disease Management Demonstration Project for TRICARE...

  2. Achieving Effective Risk Management Reduction Throughout Decommissioning at the Columbus Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, K.D.

    2006-07-01

    Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less

  3. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    NASA Technical Reports Server (NTRS)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  4. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  5. The XChemExplorer graphical workflow tool for routine or large-scale protein-ligand structure determination.

    PubMed

    Krojer, Tobias; Talon, Romain; Pearce, Nicholas; Collins, Patrick; Douangamath, Alice; Brandao-Neto, Jose; Dias, Alexandre; Marsden, Brian; von Delft, Frank

    2017-03-01

    XChemExplorer (XCE) is a data-management and workflow tool to support large-scale simultaneous analysis of protein-ligand complexes during structure-based ligand discovery (SBLD). The user interfaces of established crystallographic software packages such as CCP4 [Winn et al. (2011), Acta Cryst. D67, 235-242] or PHENIX [Adams et al. (2010), Acta Cryst. D66, 213-221] have entrenched the paradigm that a `project' is concerned with solving one structure. This does not hold for SBLD, where many almost identical structures need to be solved and analysed quickly in one batch of work. Functionality to track progress and annotate structures is essential. XCE provides an intuitive graphical user interface which guides the user from data processing, initial map calculation, ligand identification and refinement up until data dissemination. It provides multiple entry points depending on the need of each project, enables batch processing of multiple data sets and records metadata, progress and annotations in an SQLite database. XCE is freely available and works on any Linux and Mac OS X system, and the only dependency is to have the latest version of CCP4 installed. The design and usage of this tool are described here, and its usefulness is demonstrated in the context of fragment-screening campaigns at the Diamond Light Source. It is routinely used to analyse projects comprising 1000 data sets or more, and therefore scales well to even very large ligand-design projects.

  6. Hardware Implementation of Multiple Fan Beam Projection Technique in Optical Fibre Process Tomography

    PubMed Central

    Rahim, Ruzairi Abdul; Fazalul Rahiman, Mohd Hafiz; Leong, Lai Chen; Chan, Kok San; Pang, Jon Fea

    2008-01-01

    The main objective of this project is to implement the multiple fan beam projection technique using optical fibre sensors with the aim to achieve a high data acquisition rate. Multiple fan beam projection technique here is defined as allowing more than one emitter to transmit light at the same time using the switch-mode fan beam method. For the thirty-two pairs of sensors used, the 2-projection technique and 4-projection technique are being investigated. Sixteen sets of projections will complete one frame of light emission for the 2-projection technique while eight sets of projection will complete one frame of light emission for the 4-projection technique. In order to facilitate data acquisition process, PIC microcontroller and the sample and hold circuit are being used. This paper summarizes the hardware configuration and design for this project. PMID:27879885

  7. A Qualitative Study on Certified Female Project Managers and Perceived Value of the Project Management Professional Certification

    ERIC Educational Resources Information Center

    Bozylinski, Elena

    2017-01-01

    The purpose of this phenomenological qualitative study was to explore the influence of the Project Management Professional (PMP) certification on the careers of PMP-certified female information technology project managers who are current members in a mid-Atlantic Project Management Institute chapter in the United States. The aim of this study was…

  8. Nurse managers' strategies for feeling less drained by their work: an action research and reflection project for developing emotional intelligence.

    PubMed

    Taylor, Bev; Roberts, Sue; Smyth, Therese; Tulloch, Moira

    2015-10-01

    To raise nurse managers' critical awareness of practice problems; uncover practice constraints and improve work effectiveness. Nurse management requires skills and knowledge, underscored by emotional intelligence. The research improved participants' practice and personal insights. Purposive sampling targeted nurse managers interested in improving their practice. Three experienced female nurse managers met fortnightly in a group, for 1 hour, for 10 meetings. The methods included: writing and sharing de-identified journal reflections; critically analysing practice stories; identifying a thematic concern; generating action strategies; and instituting and revising the action plan. Phase One resulted in the identification of the issue of 'being drained by the intensity of nurse managers' work'. The participants adopted five strategies: debriefing problematic situations; deflecting multiple requests; diffusing issues; naming dysfunctional behaviours; and regrouping. In Phase Two, participants implemented and revised the action plan strategies, which resulted in them feeling less drained by their work. Strategies can lessen nurse managers' sense of personal depletion. However, strategies cannot guarantee success every time because the emotional intelligence is integral to nurse management. Action research and reflection assist nurse managers to improve their practice and develop their emotional intelligence. © 2014 John Wiley & Sons Ltd.

  9. Implementing a regional oncology information system: approach and lessons learned.

    PubMed

    Evans, W K; Ashbury, F D; Hogue, G L; Smith, A; Pun, J

    2014-10-01

    Paper-based medical record systems are known to have major problems of inaccuracy, incomplete data, poor accessibility, and challenges to patient confidentiality. They are also an inefficient mechanism of record-sharing for interdisciplinary patient assessment and management, and represent a major problem for keeping current and monitoring quality control to facilitate improvement. To address those concerns, national, regional, and local health care authorities have increased the pressure on oncology practices to upgrade from paper-based systems to electronic health records. Here, we describe and discuss the challenges to implementing a region-wide oncology information system across four independent health care organizations, and we describe the lessons learned from the initial phases that are now being applied in subsequent activities of this complex project. The need for change must be shared across centres to increase buy-in, adoption, and implementation. It is essential to establish physician leadership, commitment, and engagement in the process. Work processes had to be revised to optimize use of the new system. Culture change must be included in the change management strategy. Furthermore, training and resource requirements must be thoroughly planned, implemented, monitored, and modified as required for effective adoption of new work processes and technology. Interfaces must be established with multiple existing electronic systems across the region to ensure appropriate patient flow. Periodic assessment of the existing project structure is necessary, and adjustments are often required to ensure that the project meets its objectives. The implementation of region-wide oncology information systems across different health practice locations has many challenges. Leadership is essential. A strong, collaborative information-sharing strategy across the region and with the supplier is essential to identify, discuss, and resolve implementation problems. A structure that supports project management and accountability contributes to success.

  10. Global Change adaptation in water resources management: the Water Change project.

    PubMed

    Pouget, Laurent; Escaler, Isabel; Guiu, Roger; Mc Ennis, Suzy; Versini, Pierre-Antoine

    2012-12-01

    In recent years, water resources management has been facing new challenges due to increasing changes and their associated uncertainties, such as changes in climate, water demand or land use, which can be grouped under the term Global Change. The Water Change project (LIFE+ funding) developed a methodology and a tool to assess the Global Change impacts on water resources, thus helping river basin agencies and water companies in their long term planning and in the definition of adaptation measures. The main result of the project was the creation of a step by step methodology to assess Global Change impacts and define strategies of adaptation. This methodology was tested in the Llobregat river basin (Spain) with the objective of being applicable to any water system. It includes several steps such as setting-up the problem with a DPSIR framework, developing Global Change scenarios, running river basin models and performing a cost-benefit analysis to define optimal strategies of adaptation. This methodology was supported by the creation of a flexible modelling system, which can link a wide range of models, such as hydrological, water quality, and water management models. The tool allows users to integrate their own models to the system, which can then exchange information among them automatically. This enables to simulate the interactions among multiple components of the water cycle, and run quickly a large number of Global Change scenarios. The outcomes of this project make possible to define and test different sets of adaptation measures for the basin that can be further evaluated through cost-benefit analysis. The integration of the results contributes to an efficient decision-making on how to adapt to Global Change impacts. Copyright © 2012 Elsevier B.V. All rights reserved.

  11. Planning tiger recovery: Understanding intraspecific variation for effective conservation

    PubMed Central

    Wilting, Andreas; Courtiol, Alexandre; Christiansen, Per; Niedballa, Jürgen; Scharf, Anne K.; Orlando, Ludovic; Balkenhol, Niko; Hofer, Heribert; Kramer-Schadt, Stephanie; Fickel, Jörns; Kitchener, Andrew C.

    2015-01-01

    Although significantly more money is spent on the conservation of tigers than on any other threatened species, today only 3200 to 3600 tigers roam the forests of Asia, occupying only 7% of their historical range. Despite the global significance of and interest in tiger conservation, global approaches to plan tiger recovery are partly impeded by the lack of a consensus on the number of tiger subspecies or management units, because a comprehensive analysis of tiger variation is lacking. We analyzed variation among all nine putative tiger subspecies, using extensive data sets of several traits [morphological (craniodental and pelage), ecological, molecular]. Our analyses revealed little variation and large overlaps in each trait among putative subspecies, and molecular data showed extremely low diversity because of a severe Late Pleistocene population decline. Our results support recognition of only two subspecies: the Sunda tiger, Panthera tigris sondaica, and the continental tiger, Panthera tigris tigris, which consists of two (northern and southern) management units. Conservation management programs, such as captive breeding, reintroduction initiatives, or trans-boundary projects, rely on a durable, consistent characterization of subspecies as taxonomic units, defined by robust multiple lines of scientific evidence rather than single traits or ad hoc descriptions of one or few specimens. Our multiple-trait data set supports a fundamental rethinking of the conventional tiger taxonomy paradigm, which will have profound implications for the management of in situ and ex situ tiger populations and boost conservation efforts by facilitating a pragmatic approach to tiger conservation management worldwide. PMID:26601191

  12. Planning tiger recovery: Understanding intraspecific variation for effective conservation.

    PubMed

    Wilting, Andreas; Courtiol, Alexandre; Christiansen, Per; Niedballa, Jürgen; Scharf, Anne K; Orlando, Ludovic; Balkenhol, Niko; Hofer, Heribert; Kramer-Schadt, Stephanie; Fickel, Jörns; Kitchener, Andrew C

    2015-06-01

    Although significantly more money is spent on the conservation of tigers than on any other threatened species, today only 3200 to 3600 tigers roam the forests of Asia, occupying only 7% of their historical range. Despite the global significance of and interest in tiger conservation, global approaches to plan tiger recovery are partly impeded by the lack of a consensus on the number of tiger subspecies or management units, because a comprehensive analysis of tiger variation is lacking. We analyzed variation among all nine putative tiger subspecies, using extensive data sets of several traits [morphological (craniodental and pelage), ecological, molecular]. Our analyses revealed little variation and large overlaps in each trait among putative subspecies, and molecular data showed extremely low diversity because of a severe Late Pleistocene population decline. Our results support recognition of only two subspecies: the Sunda tiger, Panthera tigris sondaica, and the continental tiger, Panthera tigris tigris, which consists of two (northern and southern) management units. Conservation management programs, such as captive breeding, reintroduction initiatives, or trans-boundary projects, rely on a durable, consistent characterization of subspecies as taxonomic units, defined by robust multiple lines of scientific evidence rather than single traits or ad hoc descriptions of one or few specimens. Our multiple-trait data set supports a fundamental rethinking of the conventional tiger taxonomy paradigm, which will have profound implications for the management of in situ and ex situ tiger populations and boost conservation efforts by facilitating a pragmatic approach to tiger conservation management worldwide.

  13. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  14. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  15. Dynamo Catalogue: Geometrical tools and data management for particle picking in subtomogram averaging of cryo-electron tomograms.

    PubMed

    Castaño-Díez, Daniel; Kudryashev, Mikhail; Stahlberg, Henning

    2017-02-01

    Cryo electron tomography allows macromolecular complexes within vitrified, intact, thin cells or sections thereof to be visualized, and structural analysis to be performed in situ by averaging over multiple copies of the same molecules. Image processing for subtomogram averaging is specific and cumbersome, due to the large amount of data and its three dimensional nature and anisotropic resolution. Here, we streamline data processing for subtomogram averaging by introducing an archiving system, Dynamo Catalogue. This system manages tomographic data from multiple tomograms and allows visual feedback during all processing steps, including particle picking, extraction, alignment and classification. The file structure of a processing project file structure includes logfiles of performed operations, and can be backed up and shared between users. Command line commands, database queries and a set of GUIs give the user versatile control over the process. Here, we introduce a set of geometric tools that streamline particle picking from simple (filaments, spheres, tubes, vesicles) and complex geometries (arbitrary 2D surfaces, rare instances on proteins with geometric restrictions, and 2D and 3D crystals). Advanced functionality, such as manual alignment and subboxing, is useful when initial templates are generated for alignment and for project customization. Dynamo Catalogue is part of the open source package Dynamo and includes tools to ensure format compatibility with the subtomogram averaging functionalities of other packages, such as Jsubtomo, PyTom, PEET, EMAN2, XMIPP and Relion. Copyright © 2016. Published by Elsevier Inc.

  16. Factors of human capital related to project success in health care work units.

    PubMed

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  17. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  18. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    NASA Astrophysics Data System (ADS)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  19. Management Innovations in Higher Education: A Descriptive Study of Information Technology Managers' Perceptions Regarding the Use and Value of Project Management in Institutions of Higher Education

    ERIC Educational Resources Information Center

    Durbin, Michael P.

    2013-01-01

    This study examined the perspectives of IT managers working in colleges and universities regarding their use of and value for project management. Descriptive and inferential analyses were used to understand individual innovativeness, innovation characteristics of project management, and the perceived use of and value for project management best…

  20. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  1. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11...

  2. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11...

  3. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2013-10-01 2013-10-01 false Covered projects. 633.11 Section 633.11...

  4. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11...

  5. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11...

  6. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  7. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  8. Scenario management and automated scenario generation

    NASA Astrophysics Data System (ADS)

    McKeever, William; Gilmour, Duane; Lehman, Lynn; Stirtzinger, Anthony; Krause, Lee

    2006-05-01

    The military planning process utilizes simulation to determine the appropriate course of action (COA) that will achieve a campaign end state. However, due to the difficulty in developing and generating simulation level COAs, only a few COAs are simulated. This may have been appropriate for traditional conflicts but the evolution of warfare from attrition based to effects based strategies, as well as the complexities of 4 th generation warfare and asymmetric adversaries have placed additional demands on military planners and simulation. To keep pace with this dynamic, changing environment, planners must be able to perform continuous, multiple, "what-if" COA analysis. Scenario management and generation are critical elements to achieving this goal. An effects based scenario generation research project demonstrated the feasibility of automated scenario generation techniques which support multiple stove-pipe and emerging broad scope simulations. This paper will discuss a case study in which the scenario generation capability was employed to support COA simulations to identify plan effectiveness. The study demonstrated the effectiveness of using multiple simulation runs to evaluate the effectiveness of alternate COAs in achieving the overall campaign (metrics-based) objectives. The paper will discuss how scenario generation technology can be employed to allow military commanders and mission planning staff to understand the impact of command decisions on the battlespace of tomorrow.

  9. Should Project Managers Buy Technical Data

    DTIC Science & Technology

    2017-04-06

    Should Project Managers Buy Technical Data? Jerry Harper April 6, 2017 PUBLISHED BY The Defense...intellectual property (IP) management and technical data rights (TDR) strategies. According to DoD Instruction 5000.02 (DoD, 2017), project managers (PMs...Defense Authorization Act NDI ................nondevelopmental item PM ................. project manager R&D ...............research and development

  10. ASK Magazine. Volume 10

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward (Editor); Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    The Academy of Program and Project Leadership (APPL) and ASK Magazine is presented. APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of our Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects-they're all here in ASK. APPL is one of our most exciting publications about project management.

  11. Situating Green Infrastructure in Context: A Framework for Adaptive Socio-Hydrology in Cities.

    PubMed

    Schifman, L A; Herrmann, D L; Shuster, W D; Ossola, A; Garmestani, A; Hopton, M E

    2017-12-01

    Management of urban hydrologic processes using green infrastructure (GI) has largely focused on stormwater management. Thus, design and implementation of GI usually rely on physical site characteristics and local rainfall patterns, and do not typically account for human or social dimensions. This traditional approach leads to highly centralized stormwater management in a disconnected urban landscape, and can deemphasize additional benefits that GI offers, such as increased property value, greenspace aesthetics, heat island amelioration, carbon sequestration, and habitat for biodiversity. We propose a Framework for Adaptive Socio-Hydrology (FrASH) in which GI planning and implementation moves from a purely hydrology-driven perspective to an integrated socio-hydrological approach. This allows for an iterative, multifaceted decision-making process that would enable a network of stakeholders to collaboratively set a dynamic, context-guided project plan for the installation of GI, rather than a 'one-size-fits-all' installation. We explain how different sectors (e.g., governance, non-governmental organizations, academia, and industry) can create a connected network of organizations that work towards a common goal. Through a graphical Chambered Nautilus model, FrASH is experimentally applied to contrasting GI case studies and shows that this multi-stakeholder, connected, de-centralized network with a co-evolving decision-making project plan results in enhanced multi-functionality, potentially allowing for the management of resilience in urban systems at multiple scales.

  12. Situating Green Infrastructure in Context: A Framework for Adaptive Socio-Hydrology in Cities

    NASA Astrophysics Data System (ADS)

    Schifman, L. A.; Herrmann, D. L.; Shuster, W. D.; Ossola, A.; Garmestani, A.; Hopton, M. E.

    2017-12-01

    Management of urban hydrologic processes using green infrastructure (GI) has largely focused on storm water management. Thus, design and implementation of GI usually rely on physical site characteristics and local rainfall patterns, and do not typically account for human or social dimensions. This traditional approach leads to highly centralized storm water management in a disconnected urban landscape and can deemphasize additional benefits that GI offers, such as increased property value, greenspace aesthetics, heat island amelioration, carbon sequestration, and habitat for biodiversity. We propose the Framework for Adaptive Socio-Hydrology (FrASH) in which GI planning and implementation moves from a purely hydrology-driven perspective to an integrated sociohydrological approach. This allows for an iterative, multifaceted decision-making process that would enable a network of stakeholders to collaboratively set a dynamic, context-guided project plan for the installation of GI, rather than a "one-size-fits-all" installation. We explain how different sectors (e.g., governance, nongovernmental organizations, communities, academia, and industry) can create a connected network of organizations that work toward a common goal. Through a graphical Chambered Nautilus model, FrASH is experimentally applied to contrasting GI case studies and shows that this multistakeholder, connected, decentralized network with a coevolving decision-making project plan results in enhanced multifunctionality, potentially allowing for the management of resilience in urban systems at multiple scales.

  13. Quantifying and valuing ecosystem services: An application of ARIES to the San Pedro River basin, USA

    USGS Publications Warehouse

    Bagstad, Kenneth J.; Semmens, Darius J.; Villa, Ferdinando; Johnson, Gary

    2014-01-01

    A large body of research exists that identifies and values ecosystem services - the benefits that ecosystems provide to humans (MA, 2005) - and their underlying ecological processes. However, the development of software decision support tools that integrate ecology, economics and geography that can be independently used within the public, private, academic and NGO sectors is a more recent phenomenon (Ruhl et al., 2007; Daily et al., 2009). Spurred by growing demand for more sophisticated analysis of the social and economic consequences of land management decisions, the US Department of Interior - Bureau of Land Management (BLM) launched a pilot project with the US Geological Survey (USGS) to assess the usefulness and feasibility of ecosystem service assessment and valuation tools to provide inputs to decision-making. The project analysed ecosystem services in the US portion of the San Pedro River watershed, which includes the BLM-managed San Pedro Riparian National Conservation Area (SPRNCA), to improve the understanding of complex social and ecological relationships that transcend administrative divisions. The BLM manages some 99 million hectares, primarily in the western United States, and 283 million hectares of sub-surface mineral estate. BLM's multiple-use mission requires that it appropriately balance non-extractive uses such as habitat conservation, recreation and archaeological heritage protection and the extractive use of resources such as timber, oil and gas, coal, uranium, and other minerals.

  14. Cooperative Projects - Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja

    2017-04-01

    Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned challenges across several cooperative projects - a virtual centre for earth system science management (CESSMA).

  15. Workplace Factors That Shape Information Technology Project Success

    ERIC Educational Resources Information Center

    Nguyen, Dan Schilling

    2013-01-01

    Information technology (IT) project success depends on having a project manager with effective decision making, leadership, and project management skills. Project success also depends on completing the project in a given budget, time, and scope. Despite these critical qualities of a successful project manager, little research has explored the…

  16. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project.

    PubMed

    Patterson, P Daniel; Higgins, J Stephen; Weiss, Patricia M; Lang, Eddy; Martin-Gill, Christian

    2018-02-15

    Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available evidence, and rate the quality of that evidence for purposes of producing an Evidence Based Guideline (EBG) for fatigue risk management in EMS operations. We completed seven systematic reviews that involved searches of six databases for literature relevant to seven research questions. These questions were developed a priori by an expert panel and framed in the Population, Intervention, Comparison, and Outcome (PICO) format and pre-registered with PROSPERO. Our target population was defined as persons 18 years of age and older classified as EMS personnel or similar shift worker groups. A panel of experts selected outcomes for each PICO question as prescribed by the Grading of Recommendations, Assessment, Development, and Evaluation (GRADE) methodology. We pooled findings, stratified by study design (experimental vs. observational) and presented results of each systematic review in narrative and quantitative form. We used meta-analyses of select outcomes to generate pooled effects. We used the GRADE methodology and the GRADEpro software to designate a quality of evidence rating for each outcome. We present the results for each systematic review in accordance with the Preferred Reporting Items for Systematic reviews and Meta-Analyses (PRISMA). More than 38,000 records were screened across seven systematic reviews. The median, minimum, and maximum inter-rater agreements (Kappa) between screeners for our seven systematic reviews were 0.66, 0.49, and 0.88, respectively. The median, minimum, and maximum number of records retained for the seven systematic reviews was 13, 1, and 100, respectively. We present key findings in GRADE Evidence Profile Tables in separate publications for each systematic review. We describe a protocol for conducting multiple, simultaneous systematic reviews connected to fatigue with the goal of creating an EBG for fatigue risk management in the EMS setting. Our approach may be informative to others challenged with the creation of EBGs that address multiple, inter-related systematic reviews with overlapping outcomes.

  17. Final Technical Report. Project Boeing SGS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bell, Thomas E.

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of criticalmore » systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor and maintain secure configuration of network devices resulting in reduced vulnerabilities for potential exploitation; Improved overall cyber security situational awareness through the integration of multiple discrete security technologies into a single cyber security reporting console; Improved ability to maintain the resiliency of critical systems in the face of a targeted cyber attack of other significant event; Improved ability to model complex networks for penetration testing and advanced training of cyber security personnel« less

  18. Business Management System Support Analysis

    NASA Technical Reports Server (NTRS)

    Parikh, Jay

    2008-01-01

    The purpose of this research project was to develop a searchable database compiled with internal and external audit findings/observations. The data will correspond to the findings and observations from the date of Center-wide implementation of the ISO 9001-2000 standard to the present (2003-2008). It was derived and extracted from several sources and was in multiple formats. Once extracted, categorization of the findings/observations would be possible. The final data was mapped to the ISO 9001-2000 standard with the understanding that it will be displayed graphically. The data will be used to verify trends, associate risks, and establish timelines to identify strengths and weaknesses to determine areas of improvement in the Kennedy Space Center Business Management System Internal Audit Program.

  19. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

  20. 49 CFR 633.29 - PMP waivers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.29 PMP waivers. A waiver will be... element is not necessary for a particular plan; or (b) The requirement of having a new project management... under a previously-approved project management plan. ...

Top