Sample records for manpower scheduling problem

  1. Problems in the Application of Behavior Modification Principles for Teaching Job-Required Behaviors to Disadvantaged Manpower Trainees. Special Report.

    ERIC Educational Resources Information Center

    Feifer, Irwin; And Others

    In its attempts to apply behavior modification principles to teaching job-required behaviors to manpower trainees, the Mobilization for Youth-Experimental Manpower Laboratory (MFY-EML), has mounted a number of reinforcement-based Neighborhood Youth Corps training programs. The nature, magnitude and scheduling of reinforcers, the nature of the…

  2. Multi-trip vehicle routing and scheduling problem with time window in real life

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Chiew, Kang-Leng; Sze, Jeeu-Fong

    2012-09-01

    This paper studies a manpower scheduling problem with multiple maintenance operations and vehicle routing considerations. Service teams located at a common service centre are required to travel to different customer sites. All customers must be served within given time window, which are known in advance. The scheduling process must take into consideration complex constraints such as a meal break during the team's shift, multiple travelling trips, synchronisation of service teams and working shifts. The main objective of this study is to develop a heuristic that can generate high quality solution in short time for large problem instances. A Two-stage Scheduling Heuristic is developed for different variants of the problem. Empirical results show that the proposed solution performs effectively and efficiently. In addition, our proposed approximation algorithm is very flexible and can be easily adapted to different scheduling environments and operational requirements.

  3. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  4. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  5. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  6. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  7. 48 CFR 1352.271-73 - Schedule of work.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Manpower Loading Curve. (4) Trade Manning Curves. (5) Subcontracting List. (b) The Production Schedule... events, and activities and shall clearly identify the critical path. The Total Manpower Loading Curve... deviation in the Production Schedule which results in a delay in the completion of work on a vessel past the...

  8. A Decomposition Approach for Shipboard Manpower Scheduling

    DTIC Science & Technology

    2009-01-01

    generalizes the bin-packing problem with no conflicts ( BPP ) which is known to be NP-hard (Garey and Johnson 1979). Hence our focus is to obtain a lower...to the BPP ; while the so called constrained packing lower bound also takes conflict constraints into account. Their computational study indicates

  9. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  10. Space station systems analysis study. Part 3: Documentation. Volume 4: Supporting research and technology report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    A brief description of recommended supporting research and technology items resulting from the space station analysis study is provided. Descriptions include the title; the status with respect to the state of the art; the justification; the technical plan including objectives and technical approach; resource requirements categorized by manpower, specialized facilities, and funding in 1977 dollars; and also the target schedule. The goal is to provide high confidence in the solutions for the various functional system development problems, and to do so within a time period compatible with the overall evolutionary space construction base schedule.

  11. Real life working shift assignment problem

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Kwek, Yeek-Ling; Tiong, Wei-King; Chiew, Kang-Leng

    2017-07-01

    This study concerns about the working shift assignment in an outlet of Supermarket X in Eastern Mall, Kuching. The working shift assignment needs to be solved at least once in every month. Current approval process of working shifts is too troublesome and time-consuming. Furthermore, the management staff cannot have an overview of manpower and working shift schedule. Thus, the aim of this study is to develop working shift assignment simulation and propose a working shift assignment solution. The main objective for this study is to fulfill manpower demand at minimum operation cost. Besides, the day off and meal break policy should be fulfilled accordingly. Demand based heuristic is proposed to assign working shift and the quality of the solution is evaluated by using the real data.

  12. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  13. 76 FR 66761 - Records Schedules; Availability and Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ..., after a specified period, of records lacking administrative, legal, research, or other value. Notice is... system used to manage manpower resources. Included is data relating to budgetary projections... reduce excess equipment and manpower for the National Guard Bureau. Included are logistical data on...

  14. Single-Pass Serial Scheduling Heuristic for Eglin AFB Range Services Division Schedule

    DTIC Science & Technology

    2009-06-01

    scheduling tool for this RCPSP. Research on a schedule improvement metaheuristic and coding of the complete algorithm is required before it can be...a schedule better by applying metaheuristic improvement algorithms to a feasible schedule after it is created. 2.5.1. Greedy Algorithm The...next available position, the algorithm will not utilize all the available range time and manpower. An improvement metaheuristic is required to

  15. Manpower and the City.

    ERIC Educational Resources Information Center

    Bolino, August C.

    Stressing the problems of American inner cities, this volume reviews major manpower problems in their urban setting, various Federal training and educational approaches to maximizing the use of manpower, and the directions that these programs may take during the 1970s. Chapter 1 reviews the general economic conditions of American cities.…

  16. Using Common Graphics Paradigms Implemented in a Java Applet to Represent Complex Scheduling Requirements

    NASA Technical Reports Server (NTRS)

    Jaap, John; Meyer, Patrick; Davis, Elizabeth

    1997-01-01

    The experiments planned for the International Space Station promise to be complex, lengthy and diverse. The scarcity of the space station resources will cause significant competition for resources between experiments. The scheduling job facing the Space Station mission planning software requires a concise and comprehensive description of the experiments' requirements (to ensure a valid schedule) and a good description of the experiments' flexibility (to effectively utilize available resources). In addition, the continuous operation of the station, the wide geographic dispersion of station users, and the budgetary pressure to reduce operations manpower make a low-cost solution mandatory. A graphical representation of the scheduling requirements for station payloads implemented via an Internet-based application promises to be an elegant solution that addresses all of these issues. The graphical representation of experiment requirements permits a station user to describe his experiment by defining "activities" and "sequences of activities". Activities define the resource requirements (with alternatives) and other quantitative constraints of tasks to be performed. Activities definitions use an "outline" graphics paradigm. Sequences define the time relationships between activities. Sequences may also define time relationships with activities of other payloads or space station systems. Sequences of activities are described by a "network" graphics paradigm. The bulk of this paper will describe the graphical approach to representing requirements and provide examples that show the ease and clarity with which complex requirements can be represented. A Java applet, to run in a web browser, is being developed to support the graphical representation of payload scheduling requirements. Implementing the entry and editing of requirements via the web solves the problems introduced by the geographic dispersion of users. Reducing manpower is accomplished by developing a concise representation which eliminates the misunderstanding possible with verbose representations and which captures the complete requirements and flexibility of the experiments.

  17. Evaluation of the HARDMAN comparability methodology for manpower, personnel and training

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.; Butler, R.; Gray, V.; Rosenberg, L.

    1984-01-01

    The methodology evaluation and recommendation are part of an effort to improve Hardware versus Manpower (HARDMAN) methodology for projecting manpower, personnel, and training (MPT) to support new acquisition. Several different validity tests are employed to evaluate the methodology. The methodology conforms fairly well with both the MPT user needs and other accepted manpower modeling techniques. Audits of three completed HARDMAN applications reveal only a small number of potential problem areas compared to the total number of issues investigated. The reliability study results conform well with the problem areas uncovered through the audits. The results of the accuracy studies suggest that the manpower life-cycle cost component is only marginally sensitive to changes in other related cost variables. Even with some minor problems, the methodology seem sound and has good near term utility to the Army. Recommendations are provided to firm up the problem areas revealed through the evaluation.

  18. A computer based approach for Material, Manpower and Equipment managementin the Construction Projects

    NASA Astrophysics Data System (ADS)

    Sasidhar, Jaladanki; Muthu, D.; Venkatasubramanian, C.; Ramakrishnan, K.

    2017-07-01

    The success of any construction project will depend on efficient management of resources in a perfect manner to complete the project with a reasonable budget and time and the quality cannot be compromised. The efficient and timely procurement of material, deployment of adequate labor at correct time and mobilization of machinery lacking in time, all of them causes delay, lack of quality and finally affect the project cost. It is known factor that Project cost can be controlled by taking corrective actions on mobilization of resources at a right time. This research focuses on integration of management systems with the computer to generate the model which uses OOM data structure which decides to include automatic commodity code generation, automatic takeoff execution, intelligent purchase order generation, and components of design and schedule integration to overcome the problems of stock out. To overcome the problem in equipment management system inventory management module is suggested and the data set of equipment registration number, equipment number, description, date of purchase, manufacturer, equipment price, market value, life of equipment, production data of the equipment which includes equipment number, date, name of the job, hourly rate, insurance, depreciation cost of the equipment, taxes, storage cost, interest, oil, grease, and fuel consumption, etc. is analyzed and the decision support systems to overcome the problem arising out improper management is generated. The problem on labor is managed using scheduling, Strategic management of human resources. From the generated support systems tool, the resources are mobilized at a right time and help the project manager to finish project in time and thereby save the abnormal project cost and also provides the percentage that can be improved and also research focuses on determining the percentage of delays that are caused by lack of management of materials, manpower and machinery in different types of projects and how the percentage various from project to project.

  19. L'Education des Adultes et les Problemes de Main-D'Oeuvre (Adult Education and Manpower Problems). Les Cahiers de L'I.C.E., 6-7.

    ERIC Educational Resources Information Center

    Canadian Inst. for Adult Education, Montreal (Quebec).

    The impact of continuing education on the complex problems encountered in developing and implementing overall manpower policies is discussed and documented in this anthology. An introductory chapter on adult education and the labor force is followed by surveys and critiques of manpower policy and the organization of the labor market in Sweden, the…

  20. Adjusting Hours to Increase Jobs: An Analysis of the Options. A Special Report of the National Commission for Manpower Policy. Special Report No. 15.

    ERIC Educational Resources Information Center

    Clark, Robert

    This fifteenth special report of the National Commission for Manpower Policy examines the interplay between the forces determining work schedules and the incidence and prevalence of unemployment. In the first chapter the author sets forth the major trends in hours of work and in the changing structure of the labor force that has led increasingly…

  1. Manpower in Oklahoma: Health Occupations.

    ERIC Educational Resources Information Center

    DeSpain, Don

    In a survey of Oklahoma business designed to develop occupational data for the present and future, 300 occupations were selected and 11 schedules prepared to reflect various types of firms. The schedule concerning medical and other health services facilities was sent to nearly 200 firms and institutions and usable information was received from…

  2. Guide to Restructuring Medical Manpower Occupations in Hospitals.

    ERIC Educational Resources Information Center

    Goldstein, Harold M.; And Others

    The guide for hospital administrators, chiefs of services, and health personnel in general, suggests ways to evaluate the utilization of manpower and to restructure health manpower occupations. The need to evaluate utilization is outlined in terms of problems faced by health institutions. The experience of the Center for Medical Manpower Studies…

  3. Deep space network resource scheduling approach and application

    NASA Technical Reports Server (NTRS)

    Eggemeyer, William C.; Bowling, Alan

    1987-01-01

    Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

  4. On Manpower Forecasting. Methods for Manpower Analysis, No.2.

    ERIC Educational Resources Information Center

    Morton, J.E.

    Some of the problems and techniques involved in manpower forecasting are discussed. This non-technical introduction to the field aims at reducing fears of data manipulation methods and at increasing respect for conceptual, logical, and analytical issues. The major approaches to manpower forecasting are explicated and evaluated under the headings:…

  5. A manpower scheduling heuristic for aircraft maintenance application

    NASA Astrophysics Data System (ADS)

    Sze, San-Nah; Sze, Jeeu-Fong; Chiew, Kang-Leng

    2012-09-01

    This research studies a manpower scheduling for aircraft maintenance, focusing on in-flight food loading operation. A group of loading teams with flexible shifts is required to deliver and upload packaged meals from the ground kitchen to aircrafts in multiple trips. All aircrafts must be served within predefined time windows. The scheduling process takes into account of various constraints such as meal break allocation, multi-trip traveling and food exposure time limit. Considering the aircrafts movement and predefined maximum working hours for each loading team, the main objective of this study is to form an efficient roster by assigning a minimum number of loading teams to the aircrafts. We proposed an insertion based heuristic to generate the solutions in a short period of time for large instances. This proposed algorithm is implemented in various stages for constructing trips due to the presence of numerous constraints. The robustness and efficiency of the algorithm is demonstrated in computational results. The results show that the insertion heuristic more efficiently outperforms the company's current practice.

  6. Goldstone (GDSCC) administrative computing

    NASA Technical Reports Server (NTRS)

    Martin, H.

    1981-01-01

    The GDSCC Data Processing Unit provides various administrative computing services for Goldstone. Those activities, including finance, manpower and station utilization, deep-space station scheduling and engineering change order (ECO) control are discussed.

  7. Manpower Requirements for Pollution Control and Water Resources in Indiana and a Related Pollution Control Technology Curriculum. Manpower Report 69-1.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN. Office of Manpower Studies.

    The purpose of this study was to identify the trained manpower needed to cope with Indiana's mounting problems in air and water pollution control, liquid and solid waste disposal, and water supply and resources. This report contains data concerning the present employment, current job opportunities, and projected manpower needs for related…

  8. Impact of Scheduled Attrition Rates on Meeting Monthly Sortie Goals in United States Air Force Bomb Wings

    DTIC Science & Technology

    2009-06-12

    predict future losses in the monthly flying schedules. The purpose of the attrition is to ensure that units meet their sortie contract consistently. In...an era of decreasing force size, it is important for units to maximize aircrew training operations, without wasting manpower and resources. Thus, the ...primary research question is as follows: Is the current USAF scheduling technique of using a 5-year historical attrition rate an effective way to

  9. Manpower Training in Community Colleges.

    ERIC Educational Resources Information Center

    Korim, Andrew S.

    The pamphlet's eight chapters review the results of a survey of community colleges, discuss some of the strengths of community colleges as they pertain to manpower training, and identify problems encountered in the operation of training programs. In addition, the development, organization, and operation of comprehensive manpower training skills…

  10. Manpower Policy in Norway. Reviews of Manpower and Social Policies.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France).

    In recent years the Norwegian manpower authorities have recognized the need for reevaluating and reformulating their objectives and functions and the scope of their activities. Problem areas have been identified and steps undertaken to implement recommended solutions. Efforts have been made to improve labor force participation rates, provide labor…

  11. Managing the Manpower Aspects of Applying Micro-Electronics Technology.

    ERIC Educational Resources Information Center

    Thornton, P.; Routledge, C.

    1980-01-01

    Outlines major effects that the application of micro-electronics devices in products/processes and in office systems will have on future manpower and skill requirements in manufacturing organizations. Identifies the type of problems these changes will pose for manpower managers. Provides general guidelines for the successful management of these…

  12. Manpower Aspects of Educational Planning. Problems for the Future.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). International Inst. for Educational Planning.

    This report, a compilation of symposium papers presented by participants from diverse professional and cultural backgrounds, examines several urgent and complex problems that lie beyond the purview of the traditional "manpower approach" to educational planning. Although the participants represented developing as well as developed countries, the…

  13. Emergent Approaches to Mental Health Problems. The Century Psychology Series.

    ERIC Educational Resources Information Center

    Cowen, Emory L., Ed.; And Others

    Innovative approaches to mental health problems are described. Conceptualizations about the following areas are outlined: psychiatry, the universe, and the community; theoretical malaise and community mental health; the relation of conceptual models to manpower needs; and mental health manpower and institutional change. Community programs and new…

  14. Strategies for Meeting Correctional Training and Manpower Needs, Four Developmental Projects.

    ERIC Educational Resources Information Center

    Law Enforcement Assistance Administration (Dept. of Justice), Washington, DC.

    The Law Enforcement Education Act of 1965 has placed special emphasis on projects involving training and utilization of correctional manpower. The four representative projects reported here give a comprehensive view of the problems of upgrading correctional staff and possible solutions to those problems: (1) "The Developmental Laboratory for…

  15. RETRAINING UNDER THE MANPOWER DEVELOPMENT AND TRAINING ACT OF 1962--INSTITUTIONAL PROGRAMS.

    ERIC Educational Resources Information Center

    HOOS, IDA R.

    A DISCUSSION OF INSTITUTIONAL RETRAINING PROGRAMS UNDER THE MANPOWER DEVELOPMENT AND TRAINING ACT (1962) OUTLINES MANPOWER REPORTING AND TRAINING PROVISIONS OF THE ACT ITSELF, DISCUSSES PROBLEMS OF IMPLEMENTATION IN CALIFORNIA (I.E., DIFFICULTY IN FURNISHING ON-THE-JOB PROGRAMS AND PROPER COUNSELING), OUTLINES NATIONAL AND REGIONAL TRAINING UNDER…

  16. The Place of Education in Manpower Planning in Developing Countries

    ERIC Educational Resources Information Center

    Fapohunda, Olanrewaju J.

    1974-01-01

    Defines manpower planning and outlines its objectives, describes the effects of education on economic growth in developing countries, and discusses problems of education in manpower planning: questions of the source of education, the content, and the percentage of the population ot be educated at a given time. Important political limitations are…

  17. [Nursing manpower and solutions in Taiwan].

    PubMed

    Teng, Su-Wen

    2014-04-01

    The shortage of nursing manpower is a long-term problem worldwide that affects Taiwan despite this country's internationally admired achievements in terms of its healthcare and national health insurance systems. This article reviews discussions related to the nursing shortage issue published by the World Health Organization, International Council of Nurses, and Taiwan Ministry of Health and Welfare. Next, an overview is given of the nursing workforce profile, causal factors behind the nursing shortage, and demand for and supply of nursing manpower. Finally, problems, resolutions, and expected outcomes for the nursing shortage in Taiwan are analyzed.

  18. Defense Manpower Policy: Presentations from the 1976 Rand Conference on Defense Manpower

    DTIC Science & Technology

    1978-12-01

    organizations working on defense manpower issues and problems, This book contains selected presentations from ti -a Rand Confer- ence on Defense Manpower...the complete Conference agenda.) Nevertheless, the papers included here provide a reasonably good sampling of the topics and issues addressed at the...one of the key concerns in the Pentagon and on Capitol Hill. Accordingly, the purpose of this book is to shed some light on some of the major issues

  19. Manpower for Health Care.

    ERIC Educational Resources Information Center

    Institute of Medicine (NAS), Washington, DC.

    The document is a collection of six papers on key problems in health manpower which were presented at a symposium during the 1974 spring meeting of the Institute of Medicine. A seventh paper provides a summary of the major themes at the conclusion of the program. All of the symposium papers deal with the principal manpower issues of supply,…

  20. The Canadian Labour Market: Readings in Manpower Economics.

    ERIC Educational Resources Information Center

    Kruger, A.M., Ed.; Meltz, N.M., Ed.

    Canadian manpower problems were researched by a group of economists at the University of Toronto in areas of interest to manpower planners and students of the labor market. The dissatisfaction of policy makers with the present operation of the labor market is discussed in three areas: (1) inadequate output due to alleged labor shortages, (2)…

  1. The Impact of Federal Programs and Policies on Manpower Planning for Scientists and Engineers: Problems and Progress.

    ERIC Educational Resources Information Center

    Scientific Manpower Commission, Washington, DC.

    This document reports the results of a workshop held to assess the impact of federal programs and legislation on manpower planning for scientists and engineers. Included are presentations relating to manpower utilization and planning via federal government agencies and professional societies for scientists and engineers. It was concluded that the…

  2. THE MANPOWER DEVELOPMENT AND TRAINING ACT, PROGRAMS AND PROCEDURES.

    ERIC Educational Resources Information Center

    Division of Manpower Development and Training. , BAVT.

    THE MANPOWER DEVELOPMENT AND TRAINING ACT (MDTA), AS AMENDED, IS DESIGNED TO DEAL WITH THE PROBLEMS OF WORKERS FACING JOB DISPLACEMENT, THE SPECIAL PROBLEMS OF THE HARDCORE UNEMPLOYED, OTHER UNEMPLOYED AND UNDEREMPLOYED, AND THE EMERGENCE OF SKILL SHORTAGE IN CERTAIN OCCUPATIONS. THE ACT IS JOINTLY ADMINISTERED BY THE SECRETARY OF HEALTH,…

  3. Critical Interfaces for Engineers and Scientists, 4 Appraisals. Proceedings of the Annual Joint Meeting of the Engineering Manpower Commission of Engineers Joint Council and the Scientific Manpower Commission, New York, May 18, 1967.

    ERIC Educational Resources Information Center

    Alden, John D.

    Contained in this booklet are the speeches given at the annual joint meeting of the Engineering Manpower Commission and the Scientific Manpower Commission. Each dealt with some problem aspect of the engineer-scientist interface. The presentation by Rear Admiral W. C. Hushing of the U. S. Navy was entitled "The Impact of High Performance Science…

  4. AI-MSG modification work plan. [LMFBR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Page, J.P.

    1973-08-20

    This document contains the Work Plan for the modification of the AI Steam Generator for tests in Large Leak Test Rig. This Work Plan describes the objectives, scope of work, schedule and manpower, end items, and meetings and reports required for the modification.

  5. Commercial Aircraft Maintenance Experience Relating to Engine External Hardware

    NASA Technical Reports Server (NTRS)

    Soditus, Sharon M.

    2006-01-01

    Airlines are extremely sensitive to the amount of dollars spent on maintaining the external engine hardware in the field. Analysis reveals that many problems revolve around a central issue, reliability. Fuel and oil leakage due to seal failure and electrical fault messages due to wire harness failures play a major role in aircraft delays and cancellations (D&C's) and scheduled maintenance. Correcting these items on the line requires a large investment of engineering resources and manpower after the fact. The smartest and most cost effective philosophy is to build the best hardware the first time. The only way to do that is to completely understand and model the operating environment, study the field experience of similar designs and to perform extensive testing.

  6. Survey of physician requirements in six specialties: manpower needs in anesthesiology, neurology, nuclear medicine, pathology, physical medicine and rehabilitation, radiology. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wills, J.

    1980-07-01

    This report was prepared to assist the Graduate Medical Education National Advisory Committee (GMENAC) in its efforts to model physician manpower requirements in six specialties: anesthesiology, neurology, nuclear medicine, pathology, physical medicine and rehabilitation, and radiology. The purpose of this report is to (1) survey and present the existing literature on manpower requirements in each of these six specialties, and (2) discuss the special problems present in each specialty in modeling manpower requirements, and where possible, suggest possible avenues of resolution.

  7. A Simulation Analysis of Work Based Navy Manpower Requirements

    DTIC Science & Technology

    2012-09-01

    Workweek is also the subject of greater discussion in the 2002 CNA study. At the time, the Navy Standard Workweek was 67 hours of...policies, states that the Navy Standard Workweek includes 8 hours of sleep a day (Navy, 2007). To properly model this while also treating...system during these non-scheduled hours . Figure 4 shows an example of a sailor’s schedule as built into Arena. The graph’s x-axis represents the

  8. Experimental Design of Multi-Crewing in R.O.K. (Republic of Korea) Navy.

    DTIC Science & Technology

    1986-12-01

    9 B. RESOURCE COSTRAINTS GEOGRAPHIC, MANPOWER, AND OTHEk ............................. 9 C. DESCRIPTION OF CURRENT OPERATIONS...Korean submarine force. B. RESOURCE COSTRAINTS , GEOGRAPHIC, MANPOWER, AND OTHER The primary yardstick for comparison of naval forces is the number and type...manpower of the Navy is generally inadequate to meet their performance requirement. This kind of problem is not only limited to internal Navy organization

  9. Preliminary plan for testing a thermionic reactor in the Plum Brook Space Power Facility

    NASA Technical Reports Server (NTRS)

    Haley, F. A.

    1972-01-01

    A preliminary plan is presented for testing a thermionic reactor in the Plum Brook Space Power Facility (SPF). A technical approach, cost estimate, manpower estimate, and schedule are presented to cover a 2 year full power reactor test.

  10. Manpower Policy and Problems in Greece. Reviews of Manpower and Social Policies No. 3.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France).

    A full solution of the employment problems of countries in the stage of development now existing in Greece, to a great extent depends upon the possibilities of achieving the accumulation of capital necessary for the establishment of new industries and other investment. It is important for Greece to promote economic progress in the different…

  11. SCIENTIFIC MANPOWER UTILIZATION, HEARINGS ON S. 430, AND S. 467, JANUARY 24-27, MARCH 29-30, 1967.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Labor and Public Welfare.

    THE PURPOSE OF BILL S. 430, "SCIENTIFIC MANPOWER UTILIZATION ACT OF 1967," IS TO FACILITATE AND ENCOURAGE THE UTILIZATION OF THE SCIENTIFIC, ENGINEERING, AND TECHNICAL RESOURCES OF THE NATION IN MEETING URGENT NATIONAL AND LOCAL PROBLEMS BY PROMOTING THE APPLICATION OF SYSTEMS ANALYSIS AND SYSTEMS ENGINEERING TO PROBLEMS IN THE AREAS OF EDUCATION,…

  12. Mini-Shifts: An Alternative to Overtime

    ERIC Educational Resources Information Center

    Werther, William B., Jr.

    1976-01-01

    Widely held misconceptions about the dependability, availability, and ability of part-time manpower have prevented this reservoir of potential employees from realizing its full capabilities. These misconceptions are explored, the advantages to using part-time personnel are discussed, and a variety of possible schedule variations are described.…

  13. Offenders as a Correctional Manpower Resource. Report of a Seminar (Washington, D.C., March 7-8, 1968).

    ERIC Educational Resources Information Center

    Joint Commission on Correctional Manpower and Training, Washington, DC.

    The use of the offender and ex-offender as manpower resources in corrections is a practice about which there is little agreement but an enormous amount of concern. Self-help programs such as Alcoholic s Anonymous and Synanon have attracted wide attraction. The concept of using a product of the problem to help others with the same problem is not…

  14. [Clinical nursing manpower: development and future prospects].

    PubMed

    Lin, Chiou-Fen; Kao, Ching-Chiu

    2014-04-01

    The significant changes in nursing manpower utilization in Taiwan over the past two decades are due in large part to the implementation of the National Health Insurance program and the rising need for long-term care. The changes have impacted clinical nursing manpower utilization in two important ways. Firstly, there has been a substantial increase in overall demand for nursing manpower. In particular, the need for clinical nurses has nearly quadrupled during this time period. Secondly, the level of difficulty involved in patient care has risen dramatically, with factors including increased disease severity and increased care quality expectations, among others. These changes, coupled with demands on nursing manpower imposed from other sectors, underpin and further exacerbate the problem of nursing manpower shortages throughout the healthcare system. To raise the quality of the nursing work environment, the Ministry of Health and Welfare (MOHW) brought together Taiwan's key professional nursing organizations to promote 10 care-reform strategies, establish the nursing-aid manpower system, and create the nursing classification system as an approach to effectively attract nurses to take positions in the medical system.

  15. Explanation of random experiment sheduling and its application to space station analysis

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1970-01-01

    The capability of the McDonnell-Douglas Phase B space station concept to complete the Blue Book Experiment program is analyzed and the Random experiment program with Resource Impact (REPRI) which was used to generate the data is described. The results indicate that station manpower and electrical power are the two resources which will constrain the amount of the Blue Book program that the station can complete. The station experiment program and its resource requirements are sensitive to levels of manpower and electrical power 13.5 men and 11 kilowatts. Continuous artificial gravity experiments have much less impact on the experiment program than experiments using separate artificial gravity periods. Station storage volume presently allocated for the FPE's and their supplies (1600 cu ft) is more than adequate. The REPRI program uses the Monte Carlo technique to generate a set of feasible experiment schedules for a space station. The schedules are statistically analyzed to determine the impact of the station experiment program resource requirements on the station concept. Also, the sensitivity of the station concept to one or more resources is assessed.

  16. Forecasting the Movement of Educational Administrators Through Vacancy Flows

    ERIC Educational Resources Information Center

    Brown, Daniel J.

    1976-01-01

    Discusses the problem of forecasting manpower flows in administrative hierarchies of educational organizations, reviews groups of manpower models, discusses characteristics of administrative hierarchies and the vacancy model as it relates to those characteristics, and carries out validation and projective tests of the model. (Author/IRT)

  17. Manpower Development for Workers in Tertiary Institutions: Distance Learning Approach

    ERIC Educational Resources Information Center

    Hassan, Moshood Ayinde

    2011-01-01

    The purpose of this study is to determine the extent to which workers patronize distance learning approach to further their education. Other purposes include: determine problems facing workers in the process of improving their knowledge and skills through distance learning approach; establish the level of attainment of manpower development…

  18. An Analysis of Health Manpower Models: Volume I.

    ERIC Educational Resources Information Center

    Bonder, Seth; And Others

    Objectives of the project were to identify and describe problem areas and policy issues confronting health manpower planning agencies at all levels, compile an inventory of models and evaluate their usefulness, and to evaluate the potential usefulness of two models (developed under contract to the Bureau of Health Resources Development) designed…

  19. Requirements and specifications of the space telescope for scientific operations

    NASA Technical Reports Server (NTRS)

    West, D. K.

    1976-01-01

    Requirements for the scientific operations of the Space Telescope and the Science Institute are used to develop operational interfaces between user scientists and the NASA ground system. General data systems are defined for observatory scheduling, daily science planning, and science data management. Hardware, software, manpower, and space are specified for several science institute locations and support options.

  20. The Training Implications of Manpower Productivity Agreements. Information Paper Number 4.

    ERIC Educational Resources Information Center

    Chemical and Allied Products Industry Training Board, Staines (England).

    This paper is concerned with the training implications of productivity agreements which seek the achievement of high stable earnings through the improved use of manpower leading to efficient low cost production, by making changes which could not be achieved by traditional wage negotiations. Consideration is given to the training problems arising…

  1. TECHNOLOGY AND MANPOWER IN THE HEALTH SERVICE INDUSTRY, 1965-75.

    ERIC Educational Resources Information Center

    STURM, HERMAN M.

    BASED UPON PUBLISHED SOURCES AND INTERVIEWS WITH EXPERTS, THE STUDY LOOKS TOWARD PROBABLE CHANGES IN THE SIZE AND JOB CONTENT OF KEY HEALTH OCCUPATIONS TO POINT OUT PROBLEMS AND OPPORTUNITIES IN DEVELOPING PROGRAMS AND POLICIES. SOME FACTORS AFFECTING HEALTH MANPOWER ARE (1) DEVELOPMENTS IN DIAGNOSIS AND PATIENT CARE, INCLUDING AUTOMATED CLINICAL…

  2. Education and Middle Manpower Development in Malaysia.

    ERIC Educational Resources Information Center

    Harris, Norman C.

    One of the essential factors in the economic development of nations is the attainment of a manpower mix which is strategically suited to current development problems, and which will also provide a catalyst for improvement and change. A review of the literature indicates that, although education per se is important, individual countries must…

  3. Phase C/D program development plan. Volume 1: Program plan

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

  4. Policy Conference on Highly Qualified Manpower, Paris, 26-28 September 1966.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France). Centre for Educational Research and Innovation.

    This conference report provides a general view of the problems arising in the education and utilization of qualified manpower and the possibility of identifying the policy measures needed in order to facilitate their solution. Part I of the report gives an account of the proceedings of the conference. Part II presents extracts from or summaries of…

  5. Manpower Planning, Occupational Education, and the Decision to Participate in the Labor Force. DASP Technical Paper No. 2.

    ERIC Educational Resources Information Center

    Kaufman, Jacob J.; Sumansky, John M.

    The report examines the multiplicity of factors which influence the labor market activity of the population and explores the implications of changes in those influential factors with regard to manpower and educational planning policy. The first section contains the introduction to the problem, summary of factors affecting labor force…

  6. Manpower Planning and Forecasting, Proceedings of the Annual Research Conference (10th, Beverly Hills, California, April 10-11, 1967).

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Inst. of Industrial Relations.

    Five conference papers covering research studies and problems related to effective utilization of manpower in southern California are presented. "The Impact of Technological Change on Employees in the Southern California Aerospace Industry," by Paul Prasow, reports a longitudinal study of social and psychological adjustment factors…

  7. Information System for Societal Cost and Benefit Analysis of Vocational and Manpower Programs. Final Report.

    ERIC Educational Resources Information Center

    Arora, Mehar

    The study was directed toward developing a manual for establishing societal benefits and costs of vocational and manpower programs in Wisconsin. After first outlining the background of benefit-cost analysis, problems in establishing cost functions in education are presented along with some important cost concepts and uses of cost information in…

  8. Training the Nation's Health Manpower.

    ERIC Educational Resources Information Center

    National Institutes of Health (DHEW), Bethesda, MD. Bureau of Health Manpower Education.

    Over the past decade, there has been an increasing concern about the lack of health manpower to serve the U.S. population. The areas hardest hit by this shortage are the poverty areas in large cities and rural areas where 30% of the population but only 10% of the physicians live. Many Federal programs have begun to alleviate the problem of the…

  9. Otolaryngology manpower in Canada: a crisis in the making?

    PubMed

    Gooden, Everton; Brown, Dale; Carr, Michelle

    2004-04-01

    Physician manpower issues have been of interest to Canadians and government officials for several decades. Since the first otolaryngology manpower survey was completed by Dr. Percy Ireland in 1962, there have been progressive declines in the physician-to-population ratio across Canada from 1 in 42 000 in 1962 to approximately 1 in 75 000 in 2000. The expected increase in our population over the next decade, the cutbacks in medical school enrollment, and an aging population will compound this problem. The system is in crisis, and this country is desperately in need of more otolaryngologists.

  10. [The manpower support of the organization of medical care in the Republic of Dagestan].

    PubMed

    Magomedova, S A; Il'intsev, E V

    2012-01-01

    The anonymous questionnaire survey was organized in the Republic of Dagestan (the percentage of urban population is less that 50%) to assess the situation with medical manpower. It is established that in rural territory all physicians-respondents work in curative preventive institutions of state or municipal forms of property. The specter of specialists is inadequate in quantitative and qualitative respect. The problem of ageing of specialists with medical university education is obvious. It is needed to regulate the manpower policy on the territorial level to prevent deterioration of quality of medical care.

  11. United Space Alliance LLC Parachute Refurbishment Facility Model

    NASA Technical Reports Server (NTRS)

    Esser, Valerie; Pessaro, Martha; Young, Angela

    2007-01-01

    The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.

  12. Efficient greedy algorithms for economic manpower shift planning

    NASA Astrophysics Data System (ADS)

    Nearchou, A. C.; Giannikos, I. C.; Lagodimos, A. G.

    2015-01-01

    Consideration is given to the economic manpower shift planning (EMSP) problem, an NP-hard capacity planning problem appearing in various industrial settings including the packing stage of production in process industries and maintenance operations. EMSP aims to determine the manpower needed in each available workday shift of a given planning horizon so as to complete a set of independent jobs at minimum cost. Three greedy heuristics are presented for the EMSP solution. These practically constitute adaptations of an existing algorithm for a simplified version of EMSP which had shown excellent performance in terms of solution quality and speed. Experimentation shows that the new algorithms perform very well in comparison to the results obtained by both the CPLEX optimizer and an existing metaheuristic. Statistical analysis is deployed to rank the algorithms in terms of their solution quality and to identify the effects that critical planning factors may have on their relative efficiency.

  13. Factors Associated with the Migration of High-Level Persons From the Philippines to the U.S.A.

    ERIC Educational Resources Information Center

    Cortes, Josefina R.

    Although all countries face shortages of professional personnel, the problem is especially critical for the developing nations, who face the drain of high-level manpower to developed nations. This study of the migration of manpower from the Philippines to the United States identifies the major factors in this exodus, improves prediction…

  14. Civilian Manning of AE, AFS, and AD Type Support Ships. Volume II. Appendices.

    DTIC Science & Technology

    1983-04-05

    Manpower FYDP Cost Calculations ...... G-1 APPENDIX H - Navy Military Manpower Economic CostLA Calculations ....................................... H...AND AMERICAN MARITIME OFFICERS - Recognizing the serious economic problems confronting the American Merchant Marine with consequential adverse effects...Mindful that certain economic interests both foreign and *" domestic have and are creating substantial damage to an American national resource, our

  15. Report on Discussions of the Task Force on the Manpower Distribution Project of the National Health Council.

    ERIC Educational Resources Information Center

    National Health Council, New York, NY.

    Twenty-six health manpower experts met to: (1) recommend criteria for selecting proposals for local/regional demonstration projects; (2) recommend criteria for selection of areas or sites in which to implement demonstration projects, and (3) develop guidelines for a national program to involve the health professions in alleviating the problem of…

  16. A Study of Career Ladders and Manpower Development for Non-Management Personnel in the Food Service Industry.

    ERIC Educational Resources Information Center

    State Univ. of New York, Ithaca. School of Hotel Administration at Cornell Univ.

    Because of its failure to provide career ladders for non-management employees, the food service industry is facing increasingly severe manpower shortages and labor turnover. Unnecessary requirements bar entry workers from many jobs, and training opportunities leave much to be desired. This report identifies the problem areas and develops a model…

  17. A Study of the Staffing Requirements for the Replacement Hospital, National Naval Medical Center, Bethesda, Maryland

    DTIC Science & Technology

    1980-08-01

    individual services. Furthermore, while historical workload statistics for the facility as a whole are available, individual services’ workload...the linear production function statistically fitted to workload data associated with these areas in order to determine the numbers of different...scheduled replacement hospital, this study was conducted to reveal that regardless of increased facility efficiency design, current manpower

  18. Analysis of Critical Parts and Materials

    DTIC Science & Technology

    1980-12-01

    1 1 1% 1% 1% 1% Large Orders Manual Ordering of Some Critical Parts Order Spares with Original Order Incentives Belter Capital Investment...demand 23 Large orders 24 Long lead procurement funding (including raw materials, facility funding) 25 Manpower analysis and training 26 Manual ... ordering of some critical parts 27 More active role in schedule negotiation 28 Multiple source procurements 29 Multi-year program funding 30 Order

  19. HIGHER EDUCATION AND THE DEMAND FOR SCIENTIFIC MANPOWER IN THE UNITED STATES, OECD REVIEWS OF NATIONAL POLICIES FOR SCIENCE AND EDUCATION.

    ERIC Educational Resources Information Center

    COCKCROFT, JOHN; AND OTHERS

    PROBLEMS OF HIGHER EDUCATION IN THE UNITED STATES IN RELATION TO FUTURE DEMANDS FOR SCIENTIFIC AND TECHNICAL MANPOWER ARE CONSIDERED IN THIS 1963 REVIEW OF NATIONAL POLICIES CONDUCTED BY THE ORGANISATION FOR ECONOMIC COOPERATION AND DEVELOPMENT (OECD). A DESCRIPTION OF THE STRUCTURE OF THE UNITED STATES HIGHER EDUCATION SYSTEM EMPHASIZES (1)…

  20. Foreign investment in Asia in the 1990s: trends, problems and implications for manpower movements.

    PubMed

    Sekiguchi, S

    1992-01-01

    Direct foreign investment (DFI) is described as an international reallocation of managerial resources through which manpower moves across borders bidirectionally. This paper describes the diversity and rapidity of change in DFI for flows among North America, western Europe, Japan, ASEAN, Taiwan, China, Hong Kong, Korea, and Russia, and the implications for manpower movements. The US share of DFI in the Pacific Rim has declined while that of Japan and Western Europe has increased with the newly industrialized economies emerging regionally as net capital exporters. US and western European DFI will increasingly turn toward the Americas and Europe. Diminished US DFI will likely be compensated by Asian intraregional flows led by Japan, South Korea, Singapore, and Hong Kong. As for migration trends, bidirectinal flows of unskilled and professional labor may be stimulated by DFI, but only limited direct effects upon manpower movements should be expected.

  1. Annual Report on Awards (1982). Graduate and Postdoctoral Fellowships, Postdoctoral Research Associateships.

    DTIC Science & Technology

    1982-07-01

    report) UNCLASSIFIED ISa. DECLASSI FICATION/DOWNGRADING SCHEDULE IS. DISTRIBUTION STATEMENT (of this Report) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION...manpower is national. Knowledge, with the more effective development and utilization of especially basic knowledge, is part of the public domain, the... publication Career Achievements of NSF Graduate tional Research Council’s tradition is even longer: the Fellows: The Awardees of 1952-1972, the result of

  2. [A study on dental manpower distribution in Shanghai Pudong new district].

    PubMed

    Gu, Qin; Feng, Xi-ping

    2006-02-01

    A study of dental manpower distribution was made in Shanghai Pudong new district in order to analyze the needs and demands for dental services in Shanghai Pudong new district, to forecast the developmental trends of dental demand in the future and to provide basis for regional programs of dental manpower in the urban areas of China. An analysis was made in 601 subjects taken from all age groups in Shanghai Pudong new district by stratified and cluster random sampling and in 83 medical institutions of stomatology in Shanghai Pudong new district by mass examination. The amount of dental manpower need and demand was computed and forecasted by means of health care need and demand and proportional analogy methods. The total amounts needed were 755-834 dentists. The total amounts demanded were 285-314 dentists. It was forecasted that the figures would be 392-1041 in the year of 2010. The prevalence of oral disease was 90.18%, but only 37.66% of subjects visited dentist in a year. The ratio of dentists to the population was 1:9375. The unbalance between demand for and supply of dental manpower was mainly due to negative awareness of people, the irrationalness of demand levels, problems from service provider and the irrationalness of dental manpower levels.

  3. Staffing for Cyberspace Operations: Summary of Analysis

    DTIC Science & Technology

    2016-08-01

    Planning & Requirements, Office of the Assistant Secretary of Defense for Manpower & Reserve Affairs, Office of the Under Secretary of Defense for...planning effort. Total force mix has long been an important area in defense manpower management, given that the wrong total force mix can put the...mission at risk or result in inefficiencies that consume scarce defense resources. In the cyber arena, the problem is complicated by a lack of legal

  4. Operations automation

    NASA Technical Reports Server (NTRS)

    Boreham, Charles Thomas

    1994-01-01

    This is truly the era of 'faster-better-cheaper' at the National Aeronautics and Space Administration/Jet Propulsion Laboratory (NASA/JPL). To continue JPL's primary mission of building and operating interplanetary spacecraft, all possible avenues are being explored in the search for better value for each dollar spent. A significant cost factor in any mission is the amount of manpower required to receive, decode, decommutate, and distribute spacecraft engineering and experiment data. The replacement of the many mission-unique data systems with the single Advanced Multimission Operations System (AMMOS) has already allowed for some manpower reduction. Now, we find that further economies are made possible by drastically reducing the number of human interventions required to perform the setup, data saving, station handover, processed data loading, and tear down activities that are associated with each spacecraft tracking pass. We have recently adapted three public domain tools to the AMMOS system which allow common elements to be scheduled and initialized without the normal human intervention. This is accomplished with a stored weekly event schedule. The manual entries and specialized scripts which had to be provided just prior to and during a pass are now triggered by the schedule to perform the functions unique to the upcoming pass. This combination of public domain software and the AMMOS system has been run in parallel with the flight operation in an online testing phase for six months. With this methodology, a savings of 11 man-years per year is projected with no increase in data loss or project risk. There are even greater savings to be gained as we learn other uses for this configuration.

  5. Joint Egypt/United States report on Egypt/United States cooperative energy assessment. Volume 5 of 5 Vols. Annexes 11--13

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-04-01

    The principal features of the existing environment of Egypt are characterized and the main problem areas identified in Annex 11. The environmental, health, and associated social issues that must be considered in choosing from among the options available to Egypt for meeting projected future energy needs are identified. The environmental impacts associated with these options are discussed and observations are made of alternte ways to minimize environmental insults. Annex 12, Manpower, analyzes the energy-related manpower situation of Egypt. Manpower education and training resources of Egypt; the existing manpower base of Egypt; manpower needs of the energy strategies; a comparison ofmore » manpower needs and existing manpower base; and the underlying economic and social factors that will make Egypt energy facility development very difficult to plan and execute are discussed. Annex 13 summarizes a preliminary analysis of the capital, labor, materials, and equipment resources required to implement alternative Egyptian energy futures and documents the assessment of several Egyptian energy development programs selected by the DOE. It egins with brief overviews of the ESPM model and data base. It then describes the method by which the system was adapted to Egyptian conditions and the results of this modification. The comparison Case energy development program is described, followed by a summary of ESPM-derived facility and resource requirements. Finally, the sensitivity of these results to several alternative energy strategies is illustrated.« less

  6. Approximate Dynamic Programming Algorithms for United States Air Force Officer Sustainment

    DTIC Science & Technology

    2015-03-26

    level of correction needed. While paying bonuses has an easily calculable cost, RIFs have more subtle costs. Mone (1994) discovered that in a steady...a regression is performed utilizing instrumental variables to minimize Bellman error. This algorithm uses a set of basis functions to approximate the...transitioned to an all-volunteer force. Charnes et al. (1972) utilize a goal programming model for General Schedule civilian manpower management in the

  7. A Patient-specific Approach to Hospital Cost Accounting

    PubMed Central

    Macdonald, Larry K.; Reuter, Louis F.

    1973-01-01

    The hospital facilities and manpower used for the various procedures of a delivery suite are identified and measured as the basis for determining individual patient costs. The method of measuring staff and facility requirements, including the “cost of readiness” and the cost of inherent inefficiencies, generates detailed information that can be used in determining utilization ranges for budgeting decisions, for planning space needs, for personnel scheduling, and for patient billing. PMID:4269322

  8. A tradeoff between the losses caused by computer viruses and the risk of the manpower shortage

    PubMed Central

    Bi, Jichao; Yang, Lu-Xing; Wu, Yingbo; Tang, Yuan Yan

    2018-01-01

    This article addresses the tradeoff between the losses caused by a new virus and the size of the team for developing an antivirus against the virus. First, an individual-level virus spreading model is proposed to capture the spreading process of the virus before the appearance of its natural enemy. On this basis, the tradeoff problem is modeled as a discrete optimization problem. Next, the influences of different factors, including the infection force, the infection function, the available manpower, the alarm threshold, the antivirus development effort and the network topology, on the optimal team size are examined through computer simulations. This work takes the first step toward the tradeoff problem, and the findings are instructive to the decision makers of network security companies. PMID:29370222

  9. A tradeoff between the losses caused by computer viruses and the risk of the manpower shortage.

    PubMed

    Bi, Jichao; Yang, Lu-Xing; Yang, Xiaofan; Wu, Yingbo; Tang, Yuan Yan

    2018-01-01

    This article addresses the tradeoff between the losses caused by a new virus and the size of the team for developing an antivirus against the virus. First, an individual-level virus spreading model is proposed to capture the spreading process of the virus before the appearance of its natural enemy. On this basis, the tradeoff problem is modeled as a discrete optimization problem. Next, the influences of different factors, including the infection force, the infection function, the available manpower, the alarm threshold, the antivirus development effort and the network topology, on the optimal team size are examined through computer simulations. This work takes the first step toward the tradeoff problem, and the findings are instructive to the decision makers of network security companies.

  10. Department of Defense Tri-Service Precision Machine-Tool Program. Quarterly report, February--April 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-06-01

    Following a planning period during which the Lawrence Livermore Laboratory and the Department of Defense managing sponsor, the USAF Materials Laboratory, agreed on work statements, the Department of Defense Tri-Service Precision Machine-Tool Program began in February 1978. Milestones scheduled for the first quarter have been met. Tasks and manpower requirements for two basic projects, precision-machining commercialization (PMC) and a machine-tool task force (MTTF), were defined. Progress by PMC includes: (1) documentation of existing precision machine-tool technology by initiation and compilation of a bibliography containing several hundred entries: (2) identification of the problems and needs of precision turning-machine builders and ofmore » precision turning-machine users interested in developing high-precision machining capability; and (3) organization of the schedule and content of the first seminar, to be held in October 1978, which will bring together representatives from the machine-tool and optics communities to address the problems and begin the process of high-precision machining commercialization. Progress by MTTF includes: (1) planning for the organization of a team effort of approximately 60 to 80 international experts to contribute in various ways to project objectives, namely, to summarize state-of-the-art cutting-machine-tool technology and to identify areas where future R and D should prove technically and economically profitable; (2) preparation of a comprehensive plan to achieve those objectives; and (3) preliminary arrangements for a plenary session, also in October, when the task force will meet to formalize the details for implementing the plan.« less

  11. Alternatives for Young School-Leavers.

    ERIC Educational Resources Information Center

    Qamar, M. Kalim

    1983-01-01

    To produce skilled manpower and reduce its reliance on foreigners, Papua New Guinea has increased access to education. But the country has lately been facing the problem of youth leaving school, along with problems of mass unemployment, rural-urban migration, and crime. Strategies to solve these problems are discussed. (IS)

  12. Current Problems of Educational Development in Nigeria

    ERIC Educational Resources Information Center

    Adeyinka, A. A.

    1975-01-01

    A discussion of problems of educational development in Nigeria focusingon the responsibility for and control of the nations' educational system, its diversification, the need to relate the schools' curricula to national manpower needs, and the issue of finance. (EH)

  13. Department of Defense Manpower Requirements Report FY 1995

    DTIC Science & Technology

    1994-05-01

    lm& INYI 94 III aIII$• ~ BY 9 SUBMI Sam 1 mm I Em 1 am m I am- ITv too a" mT amsITTm aSM . cm 10 ARMA 31 a 21 137 M1 st 1 33 157 179 to I to Ha3 201 am...determined by the DoD Retirement Board of Actuaries . This Board of Actuaries also determines an amortization schedule for the transfer of funds from the

  14. The Army’s Output Oriented Resource Management System (OORMS): The Impact on Manpower Management.

    DTIC Science & Technology

    1987-12-01

    if there are major problems with OORMS that would prevent achievement of its objectives, it would be better to identify them before the system is...MjOGr" PRGRAM TOGiln Griws THE mat ’r. M if" ARIMY A -~1-~ RATIONAL .4 APPR(OAH4" Wi. VIME Figure 5.2 The Relationsh between the MDEP and OORMS in the...manpower management, particularly the requirements determination function. In practice, however, OORMS has many deficiencies that prevent it from

  15. Challenges of training and delivery of pediatric surgical services in Africa.

    PubMed

    Chirdan, Lohfa B; Ameh, Emmanuel A; Abantanga, Francis A; Sidler, Daniel; Elhalaby, Essam A

    2010-03-01

    The practice of pediatric surgery in Africa presents multiple challenges. This report presents an overview of problems encountered in the training of pediatric surgeons as well as the delivery of pediatric surgical services in Africa. A returned structured self-administered questionnaire sent to pediatric surgeons practicing in Africa was reviewed and analyzed using SPSS version 11.5 (SPSS, Chicago, IL). Forty-nine (57%) of 86 questionnaires were returned from 8 countries. Great variability in the requirements and training of pediatric surgeons, even within the same country, was found. Many surgical colleges are responsible for standardization and board certification of pediatric surgeons across Africa. There were 6 (12%) centers that train middle level manpower. Twenty-six (53%) participants have 1 to 2 trainees, whereas 22 (45%) have irregular or no trainee. A pediatric surgical trainee needs 2 to 4 (median, 2) years of training in general surgery to be accepted for training in pediatric surgery, and it takes a trainee between 2 to 4 (median, 3) years to complete training as a pediatric surgeon in the countries surveyed. The number of pediatric surgeons per million populations is lowest in Malawi (0.06) and highest in Egypt (1.5). Problems facing adequate delivery of pediatric surgical services enumerated by participants included poor facilities, lack of support laboratory facilities, shortage of manpower, late presentation, and poverty. The training of pediatric surgical manpower in some African countries revealed great variability in training with multiple challenges. Delivery of pediatric surgical services in Africa presents problems like severe manpower shortage, high pediatric surgeon workload, and poor facilities. Standardization of pediatric surgery training across the continent is advocated, and the problems of delivery of pediatric surgical services need to be addressed urgently, not only by health care planners in Africa but by the international community and donor agencies, if the African child is to have access to essential pediatric surgical services like his or her counterpart in other developed parts of the world.

  16. Recruitment and retention in obstetrics and gynaecology in the UK.

    PubMed

    Ogbonmwan, S E O; Ogbonmwan, D E

    2010-02-01

    The problem of recruitment and retention into obstetrics and gynaecology could translate into serious manpower problems if not addressed now by making the experience of trainees and medical students rotating through the speciality memorable and improving trainees' work-life balance.

  17. Assessment of DoD Wounded Warrior Matters: Selection and Training of Warrior Transition Unit and Wounded Warrior Battalion Leaders and Cadre

    DTIC Science & Technology

    2014-08-22

    balancing cost, schedule, performance, and risk. Observation 1 DODIG-2014-100 │ 9 Warrior Transition Unit Cadre Training Program Facts Over the past 5...understaffed. The DC M&RA, and WWR must continually account for turnover, unplanned losses, and the cyclical nature of Reserve IMA manpower to balance ...provide boards with an update of military and civilian skills and qualifications which may not be included in a members Official Military Personnel

  18. Unmanned Aircraft System / Remotely Piloted Aircraft (UAS/RPA) Human Factors and Human Systems Integration Research Workshop Held in Dayton, Ohio on November 8-9, 2011

    DTIC Science & Technology

    2012-05-25

    station design . These issues include: poor ergonomics ; varying data input methods; multiple inputs required to implement a single command; lack of...facing the UAS/RPA discipline. Major discussion topics included: UAS operator selection, training, control station design , manpower and scheduling...Break 1400 – 1430: Naval UAS Training  LCDR Brent Olde 1430 – 1500: Control Station Design Issues  Melissa Walwanis 1500 – 1600: Tour of NAMRU-D

  19. An Investigation of the Educational Needs of Health Sciences Library Manpower: I. Definition of the Manpower Problem and Research Design*

    PubMed Central

    Kronick, David A.; Rees, Alan M.; Rothenberg, Lesliebeth

    1970-01-01

    In order to plan adequately for education in health science librarianship and to be able to project future demands and needs we need to know a great deal more about existing manpower in health science libraries. This paper, the first in a series of reports on an investigation to gather this data, discusses the research methodology and the development of an inventory of the institution-program population upon which the survey is based. An analysis in terms of geographic location, type (educational, research, etc.), administrative control, and primary cognate area of these institutions is presented, and their distribution through the various Regional Medical Library areas is noted. Preliminary estimates are made, based on a questionnaire to the libraries, on the size of the library population, their relationship to reporting programs or institutions, exclusive of the hospital population which is being covered in an independent survey. A questionnaire to library personnel is underway which will establish, along with the other questionnaires, a basis for exploring the relationships which exist between institutions or programs, libraries and manpower. PMID:5411708

  20. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    NASA Technical Reports Server (NTRS)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-01-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less man-power rises.Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. The Automated-Scheduling and Planning Environment (ASPEN)tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the ASE project's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  1. Restructuring Nigerian Tertiary (University) Education for Better Performance

    ERIC Educational Resources Information Center

    Oyebade, Stephen Adebanjo; Dike, Chika

    2013-01-01

    This study assesses the goals of university level of education, namely, development of high level manpower, scholarship and community service, and found that universities have not been able to achieve close to average. Problems range from social, political, financial as well as personnel issues. Specifically, they include problems of…

  2. The Management of Online Resources: Problems and Opportunities.

    ERIC Educational Resources Information Center

    Lewis, D. A.; Adkins, R.

    1981-01-01

    Describes the management of online information services at ICI Plastics Division in terms of control and development, reviews implications for higher management, and identifies problems and opportunities related to manpower, money, materials, machinery, and time. Project RADIUS (Rapid Access to Data and Information by Untrained Scientists) is also…

  3. [Investigation of dental manpower in non-public medical units in Shanghai].

    PubMed

    Liu, Yi; Feng, Xi-Ping

    2010-02-01

    A mass survey on dental manpower was made in non-public medical units in Shanghai in 2007 to analyze the number,structure,composition,distribution,equipment and out-patient departments (OPDs) of dental manpower and to approach the existing problems. The purpose was to provide information for investigating the dental manpower in Shanghai and the reasonable allocation and utilization of the dental manpower in Shanghai. A mass survey on dental manpower was made in non-public medical units in Shanghai in 2007 by means of questionnaire investigation, which included direct interview and telephone interview. The survey content included the number,structure,composition,distribution,equipment and out-patient departments(OPDs) of dental manpower in non-public medical units in Shanghai. There were 488 non-public dental units and 1172 dentists, 848 nurses, 79 technicians, 1377 dental units in Shanghai. 86.9% of the dentists were young and middle-aged, 44.88% of them had middle level professional tiles, 51.28% of them had university educational background and the specialty of 89.59% of the dentists was general dentistry. 81.84% of the nurses had primary professional tiles and 75.47% of the nurses' educational background was below the junior college degree. The ratio of the dentists to nurses to technicians was 15:11:1. The non-public dental units and dental manpower resources were concentrated in the downtown with 54.1% of the units, 57.85% of the dentists, 61.57% of the nurses and 79.75% of the technicians there. The total amount of dental out-patient departments DOPDs in non-public medical units in Shanghai in 2007 was 976,650, 61.42% in the downtown. 38.97% of the units thought the DOPDs were few or less while 57.82% considered it was just right. Among them, 20.04% of the units thought their units needed dentists. Among them, 68.09% of the units needed general dentists. Dental manpower in non-public medical units in Shanghai concentrates in the downtown and Pudong new area. The structure and composition are reasonable. Most of the patients visit the non-public units in the downtown for treatment, many units think their amount of out-patient is small and they need general dentists mostly.

  4. Remote, wireless stakeout surveillance for law enforcement

    NASA Astrophysics Data System (ADS)

    Ford, Mike; Klein, Allen; Smith, Stan; Jones, John Paul

    2005-05-01

    Inflation combined with the added burden of homeland security requirements, is increasing pressure on local law enforcement budgets and manpower resources. The problem is: how can law enforcement agencies fulfill all of their requirements? How can they respond to these requirements, including homeland security, with limited manpower? Civil Rights considerations also place constraints on law enforcement. One possible solution is the Remote Law Enforcement Surveillance System (RLESS) concept. RLESS makes more efficient use of existing manpower while avoiding infringement on civil liberties. RLESS provides the capability for unattended stakeout and surveillance. Many stakeout or surveillance operations are conducted by vice, homicide, organized crime or other task forces. Lasting from days to weeks. Many large drug stings last months involving many persons of interest. A single surveillance mission usually involves a minimum of two persons X 3 shifts per day conducting active observation, equating to 48 man-hours per day. Their tasks include watching, listening, and documenting with photography. Recent military developments have included new technologies and techniques that enable remote unattended observation of areas or points of interest. This capability is now available to support law enforcement stakeouts, thereby significantly minimizes the stresses on manpower.

  5. Estimating Manpower, Personnel, and Training Requirements Early in the Weapon System Acquisition Process: An Application of the HARDMAN Methodology to the Army’s Division Support Weapon System

    DTIC Science & Technology

    1984-02-01

    identifies the supply of personnel and training resources that can be expected at critical dates in the conceptual weapon system’s acquisition schedule...impact analysis matches demand to supply and identifies shortfalls in skills, new skill requirements, and high resource drivers. The tradeoff analysis...system. Step 5 - Conduct Impact Analysis The Impact Analysis determines the Army’s supply of those personnel and training resources required by the

  6. Changing Aircraft Carrier Procurement Schedules: Effects that a Five-Year Procurement Cycle would have on Cost, Availability, and Shipyard Manpower and Workload

    DTIC Science & Technology

    2011-01-01

    Staff, the Unified Combatant Commands, the Navy, the Marine Corps, the defense agencies, and the defense Intelligence Community under Contract W74V8H...Unified Combatant Commands, the Navy, the Marine Corps, the defense agencies, and the defense Intel- ligence Community . For more information on the...the Cuban missile crisis of October 1962. The newest active air- craft carrier, the Nimitz-class USS George H. W. Bush (CVN 77), was 1 CVN is an

  7. Reflections on Higher Education

    ERIC Educational Resources Information Center

    Fleming, R. W.

    1975-01-01

    Four problems of higher education are discussed. These include the relationship between society's manpower needs and educational policy; egalitarian admission policies and faculty workloads; government control of monetary appropriations; and economic viability of the institution. (DE)

  8. Problems of Manpower in Agriculture. OECD Documentation in Food and Agriculture.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France).

    Problems related to rapid reduction of the agricultural labor force were examined in the 21 Organisation for Economic Co-operation and Development countries. The size and changes of the agricultural labor force, economic forces tending towards change, technical requirements for labor in agriculture, and obstacles hindering economic adjustment of…

  9. The Unemployment-Inflation Dilemma: A Manpower Solution.

    ERIC Educational Resources Information Center

    Holt, Charles C.; And Others

    Unemployment and inflation pose a trade-off problem with one being employed at the expense of the other, seriously hampering efforts to deal effectively with poverty, crime, pollution, and other domestic problems. When unemployment is high, real income is relatively low so the nation feels that it cannot afford measures to solve these questions.…

  10. Work-leave rotation pattern and incidence of offshore workplace injury.

    PubMed

    Massey, S

    2018-05-17

    Studies on work-leave rotation pattern and work place injuries among offshore oil and gas workers have been few and limited to a 2- or 3-week rotation schedule. To examine incidence of workplace injury in relation to the duration of time into work rotation for extended work schedules up to 24 weeks. Six-year injury data on four offshore installations were extracted. Data were analysed for incidence of injury over time and relative risk using linear trend lines and regression. In total, 311 injuries for 1302 workers were analysed, 39% with rotation schedule of 4 weeks work and 4 weeks rest, 27% 8 weeks work and 4 weeks rest, 23% 16 weeks work and 4 weeks rest and 10% 24 weeks work and 4 weeks rest. Incidence of injury decreased as duration of time into the work rotation increased, corrected for exposure, and this was statistically significant for all rotations in first 4 weeks (P < 0.01). Negative correlation between time offshore and injury was observed in all schedules and consistent for age groups, categories of work, shifts and severity of injury. There was no difference in relative risk of injuries between the four schedules, when corrected for exposure and occupational risk of injury. These results are at variance with previous studies, although no prior study has looked beyond 3-week rotation schedule. Longer offshore schedules are safely possible and this could help decrease manpower and logistics costs for oil and gas companies coping with unprecedented low oil prices.

  11. THE IMPACT OF TECHNOLOGICAL CHANGE IN THE MEATPACKING INDUSTRY. AUTOMATION PROGRAM REPORT, NUMBER 1.

    ERIC Educational Resources Information Center

    DICK, WILLIAM G.

    TWENTY AUTOMATION MANPOWER SERVICES DEMONSTRATION PROJECTS WERE STARTED TO PROVIDE EXPERIENCE WITH JOB MARKET PROBLEMS CAUSED BY CHANGING TECHNOLOGY AND MASS LAYOFFS. THE FIRST OF THE SERIES, ESTABLISHED IN LOCAL PUBLIC EMPLOYMENT SERVICE OFFICES, THIS PROJECT DEALT WITH THE LAYOFF OF 675 WORKERS, PROBLEMS OF READJUSTMENT IN THE PLANT, THE…

  12. Smaller Communities Program, Stone County, Mississippi. Part I: Economic Base Report; Part II: Manpower Resource Report.

    ERIC Educational Resources Information Center

    Mississippi Employment Security Commission, Jackson.

    The 2-part document, published by the Mississippi Employment Security Commission, relates to the Smaller Communities Program conducted during 1969 to help alleviate employment problems in rural areas of Mississippi and to provide employment services in areas with varying economic problems. Based on data secured from Federal, state, and private…

  13. Environmental Management in Mainland China.

    ERIC Educational Resources Information Center

    Shen, Thomas T.

    1984-01-01

    Provides an overview of China's environmental pollution management by discussing: China's Environmental Protection Organization; laws and regulations; environmental protection program; education and manpower training; and research into environmental pollution problems. (The author provided technical assistance to China's environmental pollution…

  14. Indonesia: Development of a Scientific Information Network.

    ERIC Educational Resources Information Center

    Hernandono

    1978-01-01

    Discusses the development of a library network in Indonesia, including problems encountered due to inadequate manpower, the need for the support of a powerful national advisory committee, and the possibility of utilizing telecommunication facilities in the future. (CWM)

  15. Challenges of pediatric residency training in Taiwan.

    PubMed

    Tsai, Tsuen-Chiuan; Harasym, Peter H

    2006-01-01

    A crisis in pediatric residency training today has raised serious concerns about the healthcare quality for children in Taiwan. The purpose of this study was to document the problems and to propose possible solutions for improvement. The problems include: 1) manpower shortage due to the difficulty of recruiting pediatric residents; 2) heavy workload that hinders learning; 3) lack of assessment and poor program planning; and 4) inadequate institutional and financial support. As a result, physicians' competencies are not guaranteed at the end of residency training, even with the pediatric board certification. Possible solutions may include: 1) conducting research on physician manpower statistics, work hours and environment; 2) establishing a Residency Program Review Committee and provision of standards for accreditation; 3) defining the competencies mandated as a general pediatrician and developing a set of measurable qualitative standards; 4) encouraging new programs with flexibility (e.g., primary care); and 5) pursuing adequate institutional and financial supports.

  16. [Problems of X-ray mammology manpower training and management].

    PubMed

    Rozhkova, N I

    2014-01-01

    The paper considers the issues of manpower training in X-ray mammology. It mentions staff shortage and no special training, which reduces the efficient activities of X-ray mammographic rooms, as well as shortage of training facilities and no unified educational programs within interdisciplinary integration, inadequate technical equipment in the training facilities, the lack of an accounting system for training higher- and mid-level health workers, as well as engineers. Emphasis is placed on that the educational programs must comply with the organizational forms of testing the specialists to be employed. The introduction of a continuous education system should be accelerated to rule out the decay period of specialists' competence.

  17. Evolutionary Capability Delivery of Coast Guard Manpower System

    DTIC Science & Technology

    2014-06-01

    Office IID iterative incremental development model IT information technology MA major accomplishment MRA manpower requirements analysis MRD manpower...CG will need to ensure that development is low risk. The CG uses Manpower Requirements Analysis ( MRAs ) to collect the necessary manpower data to...of users. The CG uses two business processes to manage human capital: Manpower Requirements Analysis ( MRA ) and Manpower Requirements

  18. Research Visibility: Manpower Research.

    ERIC Educational Resources Information Center

    Brandon, George L., Ed.

    1969-01-01

    Thirteen research reviews in this issue pertain to manpower research organized under these topics: (1) Manpower and Youth, treating youth unemployment and the youth labor market, (2) Manpower Needs, including an analysis of manpower research since World War II, health manpower planning, the shortage of skilled and technical workers, a projection…

  19. ALPHA SMP SYSTEM(S) Final Report CRADA No. TC-1404-97

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seager, M.; Beaudet, T.

    Within the scope of this subcontract, Digital Equipment Corporation (DIGITAL) and the University, through the Lawrence Livermore National Laboratory (LLNL), engaged in joint research and development activities of mutual interest and benefit. The primary objectives of these activities were, for LLNL to improve its capability to perform its mission, and for DIGITAL to develop technical capability complimentary to this mission. The collaborative activities had direct manpower investments by DIGITAL and LLNL. The project was divided into four areas of concern, which were handled concurrently. These areas included Gang Scheduling, Numerical Methods, Applications Development and Code Development Tools.

  20. Space station common module power system network topology and hardware development

    NASA Technical Reports Server (NTRS)

    Landis, D. M.

    1985-01-01

    Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

  1. SOCIAL SCIENTISTS VIEW POVERTY AS A SOCIAL PROBLEM, PROCEEDINGS OF THE NATIONAL COMMUNITY DEVELOPMENT SEMINAR (5TH, MICHIGAN STATE UNIVERSITY, SEPTEMBER 11-14, 1966).

    ERIC Educational Resources Information Center

    Michigan State Univ., East Lansing.

    A COMMUNITY DEVELOPMENT SEMINAR, WHICH FOCUSED ON RELATING VARIOUS SOCIAL SCIENCES TO THE ISSUES OF POVERTY, INCLUDED PAPERS ON SOCIOLOGICAL ASPECTS OF POVERTY, POLITICAL PARTICIPATION BY THE POOR, MANPOWER DEVELOPMENT NEEDS, GEOGRAPHIC FACTORS IN POVERTY, URBAN PLANNING, POLICE SERVICES, APPLICATIONS OF ANTHROPOLOGY, PROBLEMS IN SOCIAL WORK…

  2. Safety Specialist Manpower, Manpower Resources. Volumes II and III.

    ERIC Educational Resources Information Center

    Booz Allen and Hamilton, Inc., Washington, DC.

    These second and third volumes of a four-volume study of manpower in state highway safety programs over the next decade estimate manpower resources by state and in national aggregate and describe present and planned training programs for safety specialists. For each educational level, both total manpower and manpower actually available for…

  3. Constraint-based integration of planning and scheduling for space-based observatory management

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven F.

    1994-01-01

    Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

  4. A meta-heuristic method for solving scheduling problem: crow search algorithm

    NASA Astrophysics Data System (ADS)

    Adhi, Antono; Santosa, Budi; Siswanto, Nurhadi

    2018-04-01

    Scheduling is one of the most important processes in an industry both in manufacturingand services. The scheduling process is the process of selecting resources to perform an operation on tasks. Resources can be machines, peoples, tasks, jobs or operations.. The selection of optimum sequence of jobs from a permutation is an essential issue in every research in scheduling problem. Optimum sequence becomes optimum solution to resolve scheduling problem. Scheduling problem becomes NP-hard problem since the number of job in the sequence is more than normal number can be processed by exact algorithm. In order to obtain optimum results, it needs a method with capability to solve complex scheduling problems in an acceptable time. Meta-heuristic is a method usually used to solve scheduling problem. The recently published method called Crow Search Algorithm (CSA) is adopted in this research to solve scheduling problem. CSA is an evolutionary meta-heuristic method which is based on the behavior in flocks of crow. The calculation result of CSA for solving scheduling problem is compared with other algorithms. From the comparison, it is found that CSA has better performance in term of optimum solution and time calculation than other algorithms.

  5. [Designing dental manpower index to evaluate dental manpower resources].

    PubMed

    Li, Gang; Ni, Zong-zan

    2004-06-01

    The purpose of this investigation is to find out a method to evaluate dental manpower resources. We selected population, GDP, number of dentist and number of different oral health professionals from certain internet stations, published books and journals from 1996 to 2000 as our investigating data. Data was collected from 100 countries. Our investigation found that the design of dental manpower index to evaluate dental manpower resources was effective and convenient. Dental manpower index is a good method to evaluate dental manpower resources.

  6. The National Manpower Survey of the Criminal Justice System. Volume Six: Criminal Justice Manpower Planning.

    ERIC Educational Resources Information Center

    National Planning Association, Washington, DC.

    Focusing on data needs and methods for manpower planning and manpower projections, this document is one in a series of six volumes reporting the results of the National Manpower Survey (NMS) of the Criminal Justice System. Chapter 1 of five chapters discusses the role and objectives of criminal justice manpower planning at different levels of…

  7. Balancing antagonistic time and resource utilization constraints in over-subscribed scheduling problems

    NASA Technical Reports Server (NTRS)

    Smith, Stephen F.; Pathak, Dhiraj K.

    1991-01-01

    In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.

  8. Crowd Sourced Formal Verification-Augmentation (CSFV-A)

    DTIC Science & Technology

    2016-06-01

    Formal Verification (CSFV) program built games that recast FV problems into puzzles to make these problems more accessible, increasing the manpower to...construct FV proofs. This effort supported the CSFV program by hosting the games on a public website, and analyzed the gameplay for efficiency to...provide FV proofs. 15. SUBJECT TERMS Crowd Source, Software, Formal Verification, Games 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT

  9. Marine Corps Readiness: The Costs of First-Term Dependency

    DTIC Science & Technology

    2000-01-01

    Marines always get the job done, and the Marines are the masters of unfailing alchemy which converts unoriented youths into proud, self-reliant...especially in localities with high off base housing costs. Finances and housing problems are at the root of many other problems which service...Marine Corps Readiness: The Cost of First-Term Dependency CSC 2000 Subject Area – Manpower Table of Contents Page DISCLAIMER

  10. AUTOMATION.

    ERIC Educational Resources Information Center

    Manpower Research Council, Milwaukee, WI.

    THE MANPOWER RESEARCH COUNCIL, A NONPROFIT SERVICE ORGANIZATION, HAS AS ITS OBJECTIVE THE DEVELOPMENT OF AN INTERCHANGE AMONG THE MANUFACTURING AND SERVICE INDUSTRIES OF THE UNITED STATES OF INFORMATION ON EMPLOYMENT, INDUSTRIAL RELATIONS TRENDS AND ACTIVITIES, AND MANAGEMENT PROBLEMS. A SURVEY OF 200 MEMBER CORPORATIONS, EMPLOYING A TOTAL OF…

  11. CENTRALIZED MANAGEMENT OF SMALL TREATMENT PLANTS USING INSTRUMENTS AND REMOTE ALARMS

    EPA Science Inventory

    The operation and maintenance of small treatment plants and associated lift stations pose unique and difficult problems to the authority responsible for their performance. Due to financial and manpower limitations, they must operate unattended the majority of the time. Undetected...

  12. Decomposability and scalability in space-based observatory scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1992-01-01

    In this paper, we discuss issues of problem and model decomposition within the HSTS scheduling framework. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) scheduling problem, motivated by the limitations of the current solution and, more generally, the insufficiency of classical planning and scheduling approaches in this problem context. We first summarize the salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research. Then, we describe some key problem decomposition techniques supported by HSTS and underlying our integrated planning and scheduling approach, and we discuss the leverage they provide in solving space-based observatory scheduling problems.

  13. AI techniques for a space application scheduling problem

    NASA Technical Reports Server (NTRS)

    Thalman, N.; Sparn, T.; Jaffres, L.; Gablehouse, D.; Judd, D.; Russell, C.

    1991-01-01

    Scheduling is a very complex optimization problem which can be categorized as an NP-complete problem. NP-complete problems are quite diverse, as are the algorithms used in searching for an optimal solution. In most cases, the best solutions that can be derived for these combinatorial explosive problems are near-optimal solutions. Due to the complexity of the scheduling problem, artificial intelligence (AI) can aid in solving these types of problems. Some of the factors are examined which make space application scheduling problems difficult and presents a fairly new AI-based technique called tabu search as applied to a real scheduling application. the specific problem is concerned with scheduling application. The specific problem is concerned with scheduling solar and stellar observations for the SOLar-STellar Irradiance Comparison Experiment (SOLSTICE) instrument in a constrained environment which produces minimum impact on the other instruments and maximizes target observation times. The SOLSTICE instrument will gly on-board the Upper Atmosphere Research Satellite (UARS) in 1991, and a similar instrument will fly on the earth observing system (Eos).

  14. SOFIA's Choice: Automating the Scheduling of Airborne Observations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Norvig, Peter (Technical Monitor)

    1999-01-01

    This paper describes the problem of scheduling observations for an airborne telescope. Given a set of prioritized observations to choose from, and a wide range of complex constraints governing legitimate choices and orderings, how can we efficiently and effectively create a valid flight plan which supports high priority observations? This problem is quite different from scheduling problems which are routinely solved automatically in industry. For instance, the problem requires making choices which lead to other choices later, and contains many interacting complex constraints over both discrete and continuous variables. Furthermore, new types of constraints may be added as the fundamental problem changes. As a result of these features, this problem cannot be solved by traditional scheduling techniques. The problem resembles other problems in NASA and industry, from observation scheduling for rovers and other science instruments to vehicle routing. The remainder of the paper is organized as follows. In 2 we describe the observatory in order to provide some background. In 3 we describe the problem of scheduling a single flight. In 4 we compare flight planning and other scheduling problems and argue that traditional techniques are not sufficient to solve this problem. We also mention similar complex scheduling problems which may benefit from efforts to solve this problem. In 5 we describe an approach for solving this problem based on research into a similar problem, that of scheduling observations for a space-borne probe. In 6 we discuss extensions of the flight planning problem as well as other problems which are similar to flight planning. In 7 we conclude and discuss future work.

  15. Manpower Education in a Growing Economy.

    ERIC Educational Resources Information Center

    Darcy, Robert L.; Powell, Phillip E.

    This publication provides an introduction to manpower education and presents a summary report on a 2-year res"arch and curriculum development project for manpower and economic education at the junior high school level. The introduction includes "The Meaning of Manpower Education" and "Major Themes for A Manpower Education Course" which outlines…

  16. Manpower Planning: A Research Bibliography and Supplement. Bulletin 45 and Supplement I.

    ERIC Educational Resources Information Center

    Keaveny, Timothy J.; Herman, Georgianna

    This bibliography is composed of 260 citations ranging in date from 1942 to 1967, but emphasizing the 1960 to 1967 period. Listings are arranged alphabetically according to author under the general divisions of Introduction to Manpower Planning, Aggregate Manpower Planning, Disaggregate Manpower Planning, Foreign Manpower Planning, Manpower…

  17. IMPLEMENTING NONPROFESSIONAL PROGRAMS IN HUMAN SERVICES. MANPOWER TRAINING SERIES.

    ERIC Educational Resources Information Center

    SCHMAIS, AARON

    SPECIFIC PROCESSES FOR UTILIZING NONPROFESSIONAL EMPLOYEES IN HUMAN SERVICES ARE PRESENTED. THE BACKGROUND, CURRENT STATUS, AND PROBLEMS ARE DISCUSSED. THE ELEMENTS CONSIDERED ARE RECRUITMENT, SCREENING AND SELECTION, TRAINING, PLACEMENT, SUPERVISION, UPGRADING, AND EVALUATION. EXAMPLES OF NONPROFESSIONAL POSITIONS INCLUDE THE CASE AIDE IN SOCIAL…

  18. Training Unpolluters

    ERIC Educational Resources Information Center

    Manpower, 1970

    1970-01-01

    The shortage of trained manpower remains a troublesome problem that must be overcome if the national attack on water pollution succeeds. The total number of persons treating waste water in 1967 was 11,300 professionals, 10,300 technicians, 23,500 sewage treatment plant operators, and 50,000 maintenance workers. (BC)

  19. Secondary Education, Training, and Employment: Nationalizing Education and Employment Problems in Malaysia

    ERIC Educational Resources Information Center

    Kee, Chang Min

    1973-01-01

    The development of the Malaysian national educational system is described. An outline of the vocational component of the system is presented with an evaluation of descrepancies between output of the formal educational system and the manpower requirements of the economy. (KM)

  20. Work Breakdown Structure (WBS) and WBS dictionary. [advanced x ray astrophysics facility (AXAF)

    NASA Technical Reports Server (NTRS)

    Cocuzzo, F.

    1994-01-01

    This document is intended to provide the framework for defining all work to be accomplished under the proposed contract for the mission support program as defined by Section J-1 Statement of Work (SOW) of the RFP No.8-1-3-TA-50030 dated 11/2/93. The time period of performance of this contract will be from 3/1/94 through to the end of fiscal 1999. In addition to providing the framework for the integration of the cost, schedule, and manpower planning necessary to accomplish this work it establishes the association among the WBS elements, the SOW, and the Technical Proposal.

  1. Manpower Trends in Czechoslovakia: 1950 to 1990.

    ERIC Educational Resources Information Center

    Elias, Andrew

    This report, one of a series of manpower studies, presents various series of data on the manpower of Czechoslovakia, especially for the years 1950-70, and two projections of the economically active population for the years 1971-90. The different measures are defined, the population base, manpower trends, and the general manpower situation are…

  2. Noncontingent reinforcement without extinction plus differential reinforcement of alternative behavior during treatment of problem behavior.

    PubMed

    Fritz, Jennifer N; Jackson, Lynsey M; Stiefler, Nicole A; Wimberly, Barbara S; Richardson, Amy R

    2017-07-01

    The effects of noncontingent reinforcement (NCR) without extinction during treatment of problem behavior maintained by social positive reinforcement were evaluated for five individuals diagnosed with autism spectrum disorder. A continuous NCR schedule was gradually thinned to a fixed-time 5-min schedule. If problem behavior increased during NCR schedule thinning, a continuous NCR schedule was reinstated and NCR schedule thinning was repeated with differential reinforcement of alternative behavior (DRA) included. Results showed an immediate decrease in all participants' problem behavior during continuous NCR, and problem behavior maintained at low levels during NCR schedule thinning for three participants. Problem behavior increased and maintained at higher rates during NCR schedule thinning for two other participants; however, the addition of DRA to the intervention resulted in decreased problem behavior and increased mands. © 2017 Society for the Experimental Analysis of Behavior.

  3. Health Manpower Statistics, Fiscal Year 1985.

    DTIC Science & Technology

    1985-01-01

    Professional Health Manpower Personnel by Discipline and Sex .................................................................................... 3 Figure 1...Professional Health Manpower Personnel by Discipline and Sex .................................................................................... 6...Figure 2 - Professional Health Manpower Personnel by Military Department and Sex

  4. BEHAVIORAL TECHNOLOGY AND MANPOWER DEVELOPMENT.

    ERIC Educational Resources Information Center

    COOK, DONALD A.; MECHNER, FRANCIS

    A BRIEF HISTORIC SURVEY WHICH PLACES PROGRAMED INSTRUCTION IN THE PROPER PERSPECTIVE RELATIVE TO BEHAVIORAL TECHNOLOGY AS A WHOLE IS PRESENTED. BEHAVIORAL TECHNOLOGY IS THE APPLICATION OF LEARNING THEORY TO PRACTICAL PROBLEMS OF TRAINING AND EDUCATION. THE APPLICATION OF BEHAVIORAL TECHNOLOGY TO THE TEACHING OF CERTAIN VERBAL AND INTELLECTUAL…

  5. Administrative Issues in Institutions for the Mentally Retarded.

    ERIC Educational Resources Information Center

    Cleland, Charles C.; Swartz, Jon D.

    Designed primarily for administrators of both public and private institutions for the mentally retarded, the volume offers guidelines for coping with three areas of modification of institutional image, daily operational problems concerning manpower and equipment, and future demands upon institutions. Brief exercises following some of the readings…

  6. Job shop scheduling problem with late work criterion

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.

  7. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  8. Research on Production Scheduling System with Bottleneck Based on Multi-agent

    NASA Astrophysics Data System (ADS)

    Zhenqiang, Bao; Weiye, Wang; Peng, Wang; Pan, Quanke

    Aimed at the imbalance problem of resource capacity in Production Scheduling System, this paper uses Production Scheduling System based on multi-agent which has been constructed, and combines the dynamic and autonomous of Agent; the bottleneck problem in the scheduling is solved dynamically. Firstly, this paper uses Bottleneck Resource Agent to find out the bottleneck resource in the production line, analyses the inherent mechanism of bottleneck, and describes the production scheduling process based on bottleneck resource. Bottleneck Decomposition Agent harmonizes the relationship of job's arrival time and transfer time in Bottleneck Resource Agent and Non-Bottleneck Resource Agents, therefore, the dynamic scheduling problem is simplified as the single machine scheduling of each resource which takes part in the scheduling. Finally, the dynamic real-time scheduling problem is effectively solved in Production Scheduling System.

  9. Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

  10. Work Force Adjustments in Private Industry. Their Implications for Manpower Policy. Manpower Automation Research Monograph No. 7.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    The first part of this monograph represents the proceedings of a 1-day conference of manpower analysts on the processes by which private industry meets changing manpower requirements and the implications of these work force adjustments for manpower policy. The second part consists of the report on which the conference discussion was based. The…

  11. Navy Manpower Planning

    DTIC Science & Technology

    2017-03-31

    requirements based on valid, approved workload. • Link peacetime and mobilization manpower requirements. 16 Moreover, the purpose of the SMRD is to... research and policy; energy and environment; manpower management; acquisition and cost; infrastructure; and military readiness . CPP-2017 -U-015038-Final...CNA ANALYSIS & SOLUTIONS 31st March 2017 Subject: NAVY MANPOWER PLANNING MONOGRAPH Navy manpower planning is a rich and complex topic that has a

  12. The Modeling of Factors That Influence Coast Guard Manpower Requirements

    DTIC Science & Technology

    2014-12-01

    applications, and common data warehouses needed to fully develop an effective and efficient manpower requirements engineering and management program. The... manpower requirements determination ensures a ready force, and safe and effective mission execution. Shortage or excess of manpower is the catalyst...FACTORS THAT INFLUENCE COAST GUARD MANPOWER REQUIREMENTS by Kara M. Lavin December 2014 Thesis Advisor: Ronald E. Giachetti Co-Advisor

  13. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  14. DEVELOPMENTS IN TECHNICAL AND VOCATIONAL EDUCATION.

    ERIC Educational Resources Information Center

    HARRIS, NORMAN C.

    THE JUNIOR COLLEGE HAS EMERGED AS THE APPROPRIATE TRAINING AGENCY FOR STUDENTS ENTERING MIDDLE MANPOWER JOBS REQUIRING A BALANCE OF COGNITIVE AND MANUAL ABILITY. THESE ARE THE STUDENTS WITH MIDDLE LEVEL ABILITIES AND ACCOMPLISHMENTS, FOR WHOM HIGH SCHOOL EDUCATION IS NOT ENOUGH AND A 4-YEAR DEGREE NOT NECESSARY. PROBLEMS ENCOUNTERED IN TRAINING…

  15. Automation of University Libraries in Kerala: Status, Problems and Prospects

    ERIC Educational Resources Information Center

    Suku, J.; Pillai, Mini G.

    2005-01-01

    This paper discusses the present scenario of automation activities of university libraries in Kerala. The survey findings mainly cover various aspects of library automation such as information technology infrastructure, in-house activities, information services and their usage, manpower development, and budget. The paper briefly describes the role…

  16. Four Characteristics for Regional Continuing Education in Medical Allied Health

    ERIC Educational Resources Information Center

    Koewing, J. Robert; And Others

    1976-01-01

    The Area Health Education Centers (AHEC) Program (created under the Comprehensive Health Manpower Act of 1971) is briefly described followed by a discussion of the University of North Carolina's regional planning efforts for continuing education. Major planning problems--aggregate numbers, continuing education suppliers, geographic distribution,…

  17. Predicting and Supplying Human Resource Requirements for the Future.

    ERIC Educational Resources Information Center

    Blake, Larry J.

    After asserting that public institutions should not provide training for nonexistent jobs, this paper reviews problems associated with the accurate prediction of future manpower needs. The paper reviews the processes currently used to project labor force needs and notes the difficulty of accurately forecasting labor market "surprises,"…

  18. Demographic Trends Affecting the Future Labor Force.

    ERIC Educational Resources Information Center

    Taeuber, Karl E.

    This report reviews recent population and manpower projections and examines how they take into account certain unexpected shifts in demographic, social, and economic behavior. It also assesses how well the particular circumstances, trends, and problems of the nation's major minority groups have been brought into the purview of the projection…

  19. A Study of the Integration of Military Personnel into the Fort Gordon Occupational Health Program.

    DTIC Science & Technology

    1980-05-01

    manpower data should be readily available to determine resource requirements. The other limiting factors which could bear on the problem include both...physical examinations and appropriate eyeglasses are provided based on both visual and safety requirements. Hazard inven- tories in areas jointly worked by

  20. New Directions for Training Technology.

    ERIC Educational Resources Information Center

    Fletcher, J. D.

    Lower manpower quality and increasingly sophisticated equipment are creating training problems for both industry and the military. The training technology demanded by this situation must be delivered to and available at the job site, must be designed to motivate independent use by students rather than to encourage teacher acceptance, must be…

  1. REVIEW OF STANISLAUS COUNTY MULTI-OCCUPATIONAL VOCATIONAL TRAINING PROJECT, 1964-1965.

    ERIC Educational Resources Information Center

    Modesto Junior Coll., CA.

    THIS REPORT OUTLINES PROBLEMS ENCOUNTERED AND PROGRESS MADE IN THE STANISLAUS COUNTY, CALIFORNIA, TRAINING PROJECT. INITIAL DIFFICULTY IN SECURING FEDERAL APPROVAL AND FUNDS FOR PREVOCATIONAL OR BASIC EDUCATION WAS ENDED BY THE AMENDED MANPOWER TRAINING AND DEVELOPMENT ACT. HOWEVER, DIFFICULTIES, MAINLY IN REORIENTING PREVOCATIONAL AND VOCATIONAL…

  2. Postsecondary Technical Education and the Energy Crisis.

    ERIC Educational Resources Information Center

    Riendeau, Albert J.

    The energy problem affects virtually every wage earner in America and cries out for increased involvement by vocational and technical educators. A recent study by the National Planning Association points up the need to project future manpower demands in energy and energy-related industries so that the country's educational and training…

  3. OUR SOCIETY'S FUTURE--IMPLICATIONS FOR THE ADMINISTRATION OF EXTENSION PROGRAMS.

    ERIC Educational Resources Information Center

    GRIFFITH, WILLIAM S.

    IN AN ADDRESS THE AUTHOR STATES THAT THE POPULATION EXPLOSION VERSUS WORLD FOOD PRODUCTION CAPACITY, TOGETHER WITH URBAN BLIGHT, POVERTY, AND FUNCTIONAL ILLITERACY, INCREASING COMPETITION FOR TRAINED MANPOWER, AND RELATED IMBALANCES IN AMERICAN EDUCATION CONSTITUTE MAJOR TRENDS AND ACUTE PROBLEMS IN TODAY'S SOCIETY. THE AUTHOR FEELS UNIVERSITIES…

  4. Optimal manpower allocation in aircraft line maintenance (Case in GMF AeroAsia)

    NASA Astrophysics Data System (ADS)

    Puteri, V. E.; Yuniaristanto, Hisjam, M.

    2017-11-01

    This paper presents a mathematical modeling to find the optimal manpower allocation in an aircraft line maintenance. This research focuses on assigning the number and type of manpower that allocated to each service. This study considers the licenced worker or Aircraft Maintenance Engineer Licence (AMEL) and non licenced worker or Aircraft Maintenance Technician (AMT). In this paper, we also consider the relationship of each station in terms of the possibility to transfer the manpower among them. The optimization model considers the number of manpowers needed for each service and the requirement of AMEL worker. This paper aims to determine the optimal manpower allocation using the mathematical modeling. The objective function of the model is to find the minimum employee expenses. The model was solved using the ILOG CPLEX software. The results show that the manpower allocation can meet the manpower need and the all load can be served.

  5. Dynamic scheduling and planning parallel observations on large Radio Telescope Arrays with the Square Kilometre Array in mind

    NASA Astrophysics Data System (ADS)

    Buchner, Johannes

    2011-12-01

    Scheduling, the task of producing a time table for resources and tasks, is well-known to be a difficult problem the more resources are involved (a NP-hard problem). This is about to become an issue in Radio astronomy as observatories consisting of hundreds to thousands of telescopes are planned and operated. The Square Kilometre Array (SKA), which Australia and New Zealand bid to host, is aiming for scales where current approaches -- in construction, operation but also scheduling -- are insufficent. Although manual scheduling is common today, the problem is becoming complicated by the demand for (1) independent sub-arrays doing simultaneous observations, which requires the scheduler to plan parallel observations and (2) dynamic re-scheduling on changed conditions. Both of these requirements apply to the SKA, especially in the construction phase. We review the scheduling approaches taken in the astronomy literature, as well as investigate techniques from human schedulers and today's observatories. The scheduling problem is specified in general for scientific observations and in particular on radio telescope arrays. Also taken into account is the fact that the observatory may be oversubscribed, requiring the scheduling problem to be integrated with a planning process. We solve this long-term scheduling problem using a time-based encoding that works in the very general case of observation scheduling. This research then compares algorithms from various approaches, including fast heuristics from CPU scheduling, Linear Integer Programming and Genetic algorithms, Branch-and-Bound enumeration schemes. Measures include not only goodness of the solution, but also scalability and re-scheduling capabilities. In conclusion, we have identified a fast and good scheduling approach that allows (re-)scheduling difficult and changing problems by combining heuristics with a Genetic algorithm using block-wise mutation operations. We are able to explain and eradicate two problems in the literature: The inability of a GA to properly improve schedules and the generation of schedules with frequent interruptions. Finally, we demonstrate the scheduling framework for several operating telescopes: (1) Dynamic re-scheduling with the AUT Warkworth 12m telescope, (2) Scheduling for the Australian Mopra 22m telescope and scheduling for the Allen Telescope Array. Furthermore, we discuss the applicability of the presented scheduling framework to the Atacama Large Millimeter/submillimeter Array (ALMA, in construction) and the SKA. In particular, during the development phase of the SKA, this dynamic, scalable scheduling framework can accommodate changing conditions.

  6. Strengthening Manpower Programs for Spanish-Speaking Americans. Report of the Department of Labor Study Group on Manpower Needs of Spanish-Speaking Americans.

    ERIC Educational Resources Information Center

    Thompson, Lewin, and Associates, Inc., Washington, DC.

    This report summarizes the findings and recommendations of a study conducted cooperatively by a management consulting firm and a team of Spanish-speaking manpower specialists. Basic issues explored were: (1) What are the manpower needs of Spanish-speaking Americans, (2) How are manpower programs meeting the needs at present, and (3) What action…

  7. Software Reliability Study

    DTIC Science & Technology

    1976-08-01

    indicates the routine’s parent subsystem and function as well. A 1 01[ Subsystem-T Function Routine PROBS Number of actual problems encountered in the...liable to be shelved in the first scheduleof manpower pinch, The n.ixt problem is one of education . Here the situation is similar to that experienced in...assurance organization, and each is feasible in the Project 5 environment. Of particular help in the date collection process was the involement of the

  8. How Funding and Policy Affect Access to and Modernization of Major Air Force Ground Test Infrastructure Assets

    DTIC Science & Technology

    2017-04-06

    center’s wind tunnels, gas turbine sea level and altitude test cells, space chambers, altitude rocket cells, ballistic ranges, arc heaters and other...number of programs, and the difficulty getting new programs approved, the services are reluctant to delay or cancel programs. Performance problems in...manpower as an indirect cost would alleviate problems with maintaining expertise. The indirect costs provide for security, base infrastructure

  9. Reexamining European Manpower Policies. A Report on a Conference Sponsored by the National Commission for Manpower Policy in Hanzinelle, Belgium, June 1976. Special Report No. 10.

    ERIC Educational Resources Information Center

    National Commission for Manpower Policy, Washington, DC.

    The conference reported here was held to bring together European manpower experts and United States representatives to discuss European manpower programs and policies developed and expanded as a result of the 1974-1976 recession and recovery, and methods for coordinating manpower and general economic policies. This report contains a list of the…

  10. An Optimization Model for Scheduling Problems with Two-Dimensional Spatial Resource Constraint

    NASA Technical Reports Server (NTRS)

    Garcia, Christopher; Rabadi, Ghaith

    2010-01-01

    Traditional scheduling problems involve determining temporal assignments for a set of jobs in order to optimize some objective. Some scheduling problems also require the use of limited resources, which adds another dimension of complexity. In this paper we introduce a spatial resource-constrained scheduling problem that can arise in assembly, warehousing, cross-docking, inventory management, and other areas of logistics and supply chain management. This scheduling problem involves a twodimensional rectangular area as a limited resource. Each job, in addition to having temporal requirements, has a width and a height and utilizes a certain amount of space inside the area. We propose an optimization model for scheduling the jobs while respecting all temporal and spatial constraints.

  11. Manpower Policy and Programmes in Canada. Reviews of Manpower and Social Policies No. 4.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France).

    This report describes the Canadian labor force and economic climate, and the employment and manpower policies which comprise Canada's active manpower policy. Expanded programs for vocational and technical training are recommended, especially for unemployed youth. (BH)

  12. Allied Health Manpower Development: An Innovative Approach.

    ERIC Educational Resources Information Center

    Lugenbeel, Archie G.

    1980-01-01

    Health care delivery and manpower shortages continually plague rural communities in the United States. This article presents the results of a Rural Allied Health Manpower Project (RAHMP) implemented in Southern Illinois. RAHMP has effectively reduced the health care manpower deficiencies in 31 counties. (CT)

  13. An Implicit Enumeration Algorithm with Binary-Valued Constraints.

    DTIC Science & Technology

    1986-03-01

    problems is the National Basketball Association ( NBA -) schedul- ing problems developed by Bean (1980), as discussed in detail in the Appendix. These...fY! X F L- %n~ P ’ % -C-10 K7 K: K7 -L- -7".i - W. , W V APPENDIX The NBA Scheduling Problem §A.1 Formulation The National Basketball Association...16 2.2 4.9 40.2 15.14 §6.2.3 NBA Scheduling Problem The last set of testing problems involves the NBA scheduling problem. A detailed description of

  14. Training and manpower issues for specialist registrars in paediatrics. How are we doing and where are we going?

    PubMed

    Byrne, O C; Boland, B; Nicholson, A J; Waldron, M; O'Neill, M B

    2005-01-01

    All Irish paediatric higher specialist trainees' opinions about the paediatric higher specialist training (HST) scheme and related manpower issues were surveyed. Information was obtained on 1) trainees' level of satisfaction with HST, 2) their ultimate career ambitions including location of final posts, 3) attitudes to both flexible training and consultancies and 4) demographics to assess the significance of gender variations. Fifty-two eligible trainees were identified using the Royal College of Physicians of Ireland database. The survey was administered as an anonymous postal survey. The response rate was 88%. Results indicated a high level of satisfaction with HST (78%) overall although problems were noted with the half-day release programme as only 63% were facilitated. Only 30% wish to practice as subspecialists, 76% of trainees wish to work in an urban hospital and 43.5% desire a flexible consultancy suggesting an incompatibility of trainees' desires with current Irish medical manpower policy. To address these difficulties we suggest establishing more rigorous audit of training posts to ensure deficiencies are corrected and the establishment of flexible training to address gender imbalance and to promote the concept of consultant job sharing.

  15. Performance comparison of some evolutionary algorithms on job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Mishra, S. K.; Rao, C. S. P.

    2016-09-01

    Job Shop Scheduling as a state space search problem belonging to NP-hard category due to its complexity and combinational explosion of states. Several naturally inspire evolutionary methods have been developed to solve Job Shop Scheduling Problems. In this paper the evolutionary methods namely Particles Swarm Optimization, Artificial Intelligence, Invasive Weed Optimization, Bacterial Foraging Optimization, Music Based Harmony Search Algorithms are applied and find tuned to model and solve Job Shop Scheduling Problems. To compare about 250 Bench Mark instances have been used to evaluate the performance of these algorithms. The capabilities of each these algorithms in solving Job Shop Scheduling Problems are outlined.

  16. Position Papers on Bilingual Bicultural Educational Manpower Development.

    ERIC Educational Resources Information Center

    Montal Educational Associates, San Fernando, CA.

    Selected by the Division of Manpower Development and Training, U. S. Office of Education (HEW, Washington, D. C.), the Montal Educational Associates conducted a Symposium for Bilingual-Bicultural Educational Manpower Development. The Symposium's purpose was to bring together Spanish Speaking educational and manpower experts from throughout the…

  17. The Crisis in Air Pollution Manpower Development

    ERIC Educational Resources Information Center

    Moeller, Dade W.

    1974-01-01

    Three studies conducted by the National Air Pollution Manpower Development Advisory Committee concluded there is a crisis in air pollution manpower development within the United States today. The studies investigated the existing federal manpower program, air pollution educational requirements and the quality of graduate level university programs.…

  18. Health Sciences Education in California, 1983-1984.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    The adequacy of health sciences education enrollment levels in California is reviewed in the context of the 1981 Health Manpower Plan. After reviewing the Plan, attention is focused on two continuing problems among the issues: medical residencies and attrition in the nursing profession. New issues that receive extensive treatment in the 1981 Plan…

  19. Vision Care and the Nation's Children.

    ERIC Educational Resources Information Center

    American Optometric Association, St. Louis, MO.

    Aspects of vision and vision care considered are the following: extent and types of vision defects of American children; importance of vision care in pre-school years, elementary, and secondary school and beyond; and manpower resources in vision care today, the extent of vision testing and care, special problem areas, and governmental support.…

  20. Health Manpower Needs in North Carolina, 1967-1973.

    ERIC Educational Resources Information Center

    North Carolina Employment Security Commission, Raleigh.

    This study sought to determine over-all growth patterns of employment in health related establishments, to project needs for 48 selected occupations through 1973, and to identify current job opportunities, training needs, and employment problems. With medical and health services growing so fast, federal agencies predict an average need of 10,000…

  1. The Penultimate C4ISR Challenge: Reducing Military Manpower and Total Operating Costs

    DTIC Science & Technology

    2010-06-01

    Understanding Human Communication The...Warfighter, p. 18. 53 Wilber Shramm and William Porter, Men, Women, Messages and Media: Understanding Human Communication (New York, Harper and...Einstein is reported to have answered, ‘Figuring out how to think about the problem.’” Men, Women, Messages and Media: Understanding Human Communication

  2. National Service Programs and Their Effects on Military Manpower and Civilian Youth Problems. Budget Issue Paper for Fiscal Year 1979.

    DTIC Science & Technology

    1978-01-01

    advent of the All-Volunteer Force (AVF), military salaries have risen substantially; working conditions have improved; recruiting and advertising ...to be second-class citizens. 14/ Alienation among disavantaged youth—for example, black teenagers in urban ghettos—is particularly high. 13/ ACE

  3. FARMWORKERS, A REPRINT FROM THE 1966 MANPOWER REPORT.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    ALTHOUGH THE AVERAGE STANDARD OF LIVING OF FARM PEOPLE HAS BEEN RISING STEADILY, THEY CONTINUE TO FACE SEVERE PROBLEMS OF UNDEREMPLOYMENT AND POVERTY. THE AVERAGE PER CAPITA INCOME OF FARM RESIDENTS IS LESS THAN TWO-THIRDS THAT OF THE NONFARM POPULATION. MILLIONS HAVE MOVED TO CITIES, LEAVING STAGNATING RURAL COMMUNITIES, AND INCREASING THE CITY…

  4. Transition from School to Work: The Role of Career Education.

    ERIC Educational Resources Information Center

    Worthington, Robert M.

    Teenage unemployment is a critical manpower problem. Youth most severely affected are minority group members and those with limited education. Many barriers stand in the way of their obtaining steady jobs: lack of training and experience, job movement, child labor laws, minimum wage standards, and competition for jobs from veterans and middle-aged…

  5. Physics Careers, Employment and Education. AIP Conference Proceedings, No. 39.

    ERIC Educational Resources Information Center

    Perl, Martin L., Ed.

    This publication contains the proceedings of a Conference on Changing Career Opportunities for Physicists, held at the Pennsylvania State University, August 1-3, 1977. The purpose of the conference was to study present and future manpower problems in the physics profession. The breadth and depth of the conference is demonstrated by these…

  6. A Review of Energy Models with Particular Reference to Employment and Manpower Analysis.

    ERIC Educational Resources Information Center

    Eckstein, Albert J.; Heien, Dale M.

    To analyze the application of quantitative models to energy-employment issues, the energy problem was viewed in three distinct, but related, phases: the post-embargo shock effects, the intermediate-term process of adjustment, and the long-run equilibrium. Against this background eighteen existing energy models (government supported as well as…

  7. The Effects of Microprocessors on Industry, Society and Employment: A Meeting of the Frontier Group on Strategies for Change in a Technological Society (Bath, England, March 13, 1979).

    ERIC Educational Resources Information Center

    Harris, N. D. C.

    Discussed are the multiple impacts of microelectronics on society. Included are discussions of the problem of predicting effects, difficulty of exploiting new technology, manpower consequences, and needs within the United Kingdom relating to microprocessors. (RE)

  8. The Youth Labor Market: A Dynamic Overview.

    ERIC Educational Resources Information Center

    Antos, Joseph R.; Mellow, Wesley S.

    Based on the National Longitudinal Surveys of over 10,000 men and women aged eighteen to twenty-seven who were interviewed annually from 1966 through 1971, this study investigates how the youth labor market operates and identifies its manpower problems that should be addressed by policymakers. A five-part recursive model is established for the…

  9. Manpower Conference for the Health Related Professions, and Dedication, School of Health Related Professions.

    ERIC Educational Resources Information Center

    Perry, J. Warren, Ed.

    More than 400 persons including national leaders in government, educational, and professional organizations and agencies attended the dedication and the 3-day conference intended to focus attention on priority needs. Conference papers include: (1) "Serving Is a Privilege, Not a Problem" by M.E. Switzer, (2) "Regional Medical…

  10. Water-Resources Manpower: Supply and Demand Patterns to 1980.

    ERIC Educational Resources Information Center

    Lewis, James E.

    Relating the supply of scientific manpower to the educational potential of the general population and the productive capacity of the educational system, this study disaggregates independent projections of scientific manpower supply and demand to yield projections for water resources manpower. This supply of engineers, natural scientists, and…

  11. Perspectives in Manpower Planning. An Edinburgh Group Report.

    ERIC Educational Resources Information Center

    Institute of Personnel Management, London (England).

    The examination of manpower planning is an important management activity rather than as a specialist technique is the purpose of this pamphlet. "The Climate of Manpower Planning" describes the present circumstances in which manpower studies are carried out and the national economic and political forces which affect organizations.…

  12. Statistical Tables on Manpower.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    The President sends to the Congress each year a report on the Nation's manpower, as required by the Manpower Development and Training Act of 1962, which includes a comprehensive report by the Department of Labor on manpower requirements, resources, utilization, and training. This statistical appendix to the Department of Labor report presents data…

  13. Public-Private Manpower Policies.

    ERIC Educational Resources Information Center

    Weber, Arnold R., Ed.; And Others

    This book deals with the question of identifying the optimal mix between public and private programs and provides some guides concerning the appropriate role of government in the manpower area. There is a need for public manpower programs which give some long range direction to manpower policies and which give continuing emphasis to the…

  14. Evaluation of Manpower Development and Training Skills Centers. Final Report.

    ERIC Educational Resources Information Center

    Olympus Research Corp., Salt Lake City, UT.

    Skills centers represent a fairly new and different component of national manpower policy. The 70 Manpower Development and Training Act (MDTA) Skills Centers are designed to provide comprehensive manpower services for the disadvantaged, including training, basic education, communication skills, counseling, placement, and follow-up. Based on visits…

  15. Development and Implementation of a Manpower Leadership Program. Project Report.

    ERIC Educational Resources Information Center

    Vogler, Daniel E.

    This report represents the first year record of the Manpower Leadership Education Project. This inaugural effort toward cooperative manpower leadership training between a labor department base and university occupational education base was made possible by a contract between the Michigan Department of Labor, Bureau of Manpower, and the University…

  16. Summary Report. Indiana College-Level Manpower Study Report Number 8.

    ERIC Educational Resources Information Center

    Greenberg, Robert M.

    Selected findings of seven previously published reports of the College-Level Manpower Study are summarized. Factors involving both manpower supply and demand were investigated and educational and occupational areas in which major supply/demand imbalances exist were determined. The primary goal was to investigate the manpower supply/demand…

  17. Compiling Planning into Scheduling: A Sketch

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Crawford, James M.; Smith, David E.

    2004-01-01

    Although there are many approaches for compiling a planning problem into a static CSP or a scheduling problem, current approaches essentially preserve the structure of the planning problem in the encoding. In this pape: we present a fundamentally different encoding that more accurately resembles a scheduling problem. We sketch the approach and argue, based on an example, that it is possible to automate the generation of such an encoding for problems with certain properties and thus produce a compiler of planning into scheduling problems. Furthermore we argue that many NASA problems exhibit these properties and that such a compiler would provide benefits to both theory and practice.

  18. Bridging the Gap Between Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  19. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  20. Allied Health Manpower Training Model. Final Report. June 27, 1973-January 31, 1975.

    ERIC Educational Resources Information Center

    Lutheran Medical Center, Brooklyn, NY.

    The purpose of the Allied Health Manpower Training Model Project has been to develop a comprehensive manpower development program for health professionals that will serve as a model for other training institutions and health care organizations as they undertake continuing manpower planning and reorganization to meet the changing requirements for…

  1. THE NEW ROLE OF THE EMPLOYMENT SERVICE IN SERVING THE DISADVANTAGED.

    ERIC Educational Resources Information Center

    LEVINE, LOUIS

    CHANGES IN MANPOWER GOALS AND OBJECTIVES, AND THE MEANS OF ACHIEVING THEM, HAS RESULTED IN A NEW ROLE FOR THE UNITED STATES EMPLOYMENT SERVICE. THE LOCAL EMPLOYMENT OFFICE IS NOW RESPONSIBLE FOR THE IMPLEMENTATION OF MANPOWER DEVELOPMENT AND TRAINING PROGRAMS AND FOR BETTER MANPOWER UTILIZATION. NEWLY ASSIGNED MANPOWER RESPONSIBILITIES WHICH THE…

  2. Manpower and Education Needs in Selected Professional Fields. Summaries of Commissioned Reports.

    ERIC Educational Resources Information Center

    Smith, Mary Howard

    Commissioned by the Southern Regional Education Board, this document contains summaries of a series of papers on manpower and education in various professional fields. Each paper addresses the following factors: present and future needs for manpower; trends which will affect manpower needs and demands; present capability of higher education to…

  3. 75 FR 45158 - Holcim (US) Inc. Corporate Division Including On-Site Leased Workers From Manpower, Office Team...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    .... Corporate Division Including On-Site Leased Workers From Manpower, Office Team and Advance Temporary... from Manpower and Office Team, Dundee, Michigan. The notice was published in the Federal Register on... Holcim (US) Inc., Corporate Division, including on-site leased workers from Manpower, Office Team Advance...

  4. [Study on manpower allocation criteria of center of disease prevention and control in the context of province level, city level and county level].

    PubMed

    Luo, Li; Waang, Ying; Sun, Mei; Su, Zhong-Xin; Ma, Ning; Xie, Hongbin; Wang, Weicheng; Yu, Jingjin; Yu, Mingzhu; Duan, Yong; Gong, Xiangguang; Chen, Zheng; Wang, Hua; Shi, Peiwu; Liang, Zhankai; Yang, Feng; Wang, Dunzhi; Yue, Jianning; Luo, Shi; Hao, Mo

    2006-01-01

    To set the manpower allocation criteria of center of disease prevention and control. Expected allocation manpower criteria was obtained through adjusting the current manpower allocation of disease prevention and control centers. The principle was to fulfill public function and promote professional efficiency. Based on function requirement, in 3 - 5 years, the manpower allocation criteria of center of disease prevention and control at provincial-level is 336 persons, at city-level is 102 persons, and at county-level is 33 persons, that means in whole country 140016 persons should be needed. In 10 years, the manpower allocation criteria of center of disease prevention and control at provincial-level is 386 persons, at city-level is 112 persons, and at county-level is 38 persons, that means in whole country 159086 persons should be needed. The manpower allocation criteria advanced in the study indicated that current manpower quantity should be greatly reduced. It is an inevitable trend that disease prevention and control centers reduce the staff quantity and promote their quality.

  5. Health manpower development in Bayelsa State, Nigeria.

    PubMed

    McFubara, Kalada G; Edoni, Elizabeth R; Ezonbodor-Akwagbe, Rose E

    2012-01-01

    Health manpower is one of the critical factors in the development of a region. This is because health is an index of development. Bayelsa State has a low level of health manpower. Thus, in this study, we sought to identify factors necessary for effective development of health manpower. Three methods were used to gather information, ie, face-to-face interviews, postal surveys, and documentary analysis. Critical incidents were identified, and content and thematic analyses were conducted. There is no full complement of a primary health care workforce in any of the health centers in the state. The three health manpower training institutions have the limitations of inadequate health care educators and other manpower training facilities, including lack of a teaching hospital. Accreditation of health manpower training institutions is a major factor for effective development of health manpower. Public officers can contribute to the accreditation process by subsuming their personal interest into the state's common interest. Bayelsa is a fast-growing state and needs a critical mass of health care personnel. To develop this workforce requires a conscious effort rich in common interests in the deployment of resources.

  6. Optimal recombination in genetic algorithms for flowshop scheduling problems

    NASA Astrophysics Data System (ADS)

    Kovalenko, Julia

    2016-10-01

    The optimal recombination problem consists in finding the best possible offspring as a result of a recombination operator in a genetic algorithm, given two parent solutions. We prove NP-hardness of the optimal recombination for various variants of the flowshop scheduling problem with makespan criterion and criterion of maximum lateness. An algorithm for solving the optimal recombination problem for permutation flowshop problems is built, using enumeration of prefect matchings in a special bipartite graph. The algorithm is adopted for the classical flowshop scheduling problem and for the no-wait flowshop problem. It is shown that the optimal recombination problem for the permutation flowshop scheduling problem is solvable in polynomial time for almost all pairs of parent solutions as the number of jobs tends to infinity.

  7. Integrated scheduling and resource management. [for Space Station Information System

    NASA Technical Reports Server (NTRS)

    Ward, M. T.

    1987-01-01

    This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.

  8. Applications of dynamic scheduling technique to space related problems: Some case studies

    NASA Astrophysics Data System (ADS)

    Nakasuka, Shinichi; Ninomiya, Tetsujiro

    1994-10-01

    The paper discusses the applications of 'Dynamic Scheduling' technique, which has been invented for the scheduling of Flexible Manufacturing System, to two space related scheduling problems: operation scheduling of a future space transportation system, and resource allocation in a space system with limited resources such as space station or space shuttle.

  9. Solving a real-world problem using an evolving heuristically driven schedule builder.

    PubMed

    Hart, E; Ross, P; Nelson, J

    1998-01-01

    This work addresses the real-life scheduling problem of a Scottish company that must produce daily schedules for the catching and transportation of large numbers of live chickens. The problem is complex and highly constrained. We show that it can be successfully solved by division into two subproblems and solving each using a separate genetic algorithm (GA). We address the problem of whether this produces locally optimal solutions and how to overcome this. We extend the traditional approach of evolving a "permutation + schedule builder" by concentrating on evolving the schedule builder itself. This results in a unique schedule builder being built for each daily scheduling problem, each individually tailored to deal with the particular features of that problem. This results in a robust, fast, and flexible system that can cope with most of the circumstances imaginable at the factory. We also compare the performance of a GA approach to several other evolutionary methods and show that population-based methods are superior to both hill-climbing and simulated annealing in the quality of solutions produced. Population-based methods also have the distinct advantage of producing multiple, equally fit solutions, which is of particular importance when considering the practical aspects of the problem.

  10. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  11. A Preliminary Evaluation of Federal Dental Manpower Subsidy Program. Health Manpower Policy Discussion Paper Series, No. A5.

    ERIC Educational Resources Information Center

    Feldstein, Paul J.

    This paper suggests an approach and an analysis of the impact that federal manpower programs have had on dentistry. The main beneficiaries under health manpower subsidy programs are indicated and some policy alternatives suggested. Emphasis is placed on federal subsidies for increasing the supply of dentists including students' financial…

  12. The Feasibility of Establishing Highway Safety Manpower Development and Research Centers at University-Level Institutions. Final Report, Volume I: Study Report.

    ERIC Educational Resources Information Center

    Chorness, Maury H.; And Others

    To examine the feasibility of establishing Highway Safety Manpower Development and Research (HSMDR) Centers at university-level institutions which would produce three types of manpower--safety specialists, safety professionals, and research manpower, previous National Highway Safety Bureau research studies and approximately 50 federally funded…

  13. Joint Chiefs of Staff > Directorates > J1 | Manpower and Personnel

    Science.gov Websites

    Management J1 | Manpower and Personnel J2 | Joint Staff Intelligence J3 | Operations J4 | Logistics► J8 | Force Structure, Resources & Assessment Contact J1 Manpower and Personnel Home : Directorates : J1 | Manpower and Personnel Mission To provide the Chairman of the Joint Chiefs of Staff

  14. Complete Report: Kodak Graphic Arts Industry Manpower Study.

    ERIC Educational Resources Information Center

    Eastman Kodak Co., Rochester, NY.

    This report is believed to be the first nationwide attempt in more than three centuries of printing in America to define graphic arts manpower needs. The objectives of this study were to determine the current status of industry manpower and to predict manpower needs for the 1970's. To carry out these objectives two questionnaires were developed, a…

  15. Manpower and Training Needs in Water Pollution Control. Senate Document No. 49.

    ERIC Educational Resources Information Center

    Department of the Interior, Washington, DC. Federal Water Pollution Control Administration.

    To determine trained manpower needs and training resources in the clean water field, data were gathered from interviews with state and federal agencies as well as the Water Pollution Control Federation, from prior manpower reports, and from Bureau of Census employment data. After analysis of present manpower resources and future requirements,…

  16. Discrete Bat Algorithm for Optimal Problem of Permutation Flow Shop Scheduling

    PubMed Central

    Luo, Qifang; Zhou, Yongquan; Xie, Jian; Ma, Mingzhi; Li, Liangliang

    2014-01-01

    A discrete bat algorithm (DBA) is proposed for optimal permutation flow shop scheduling problem (PFSP). Firstly, the discrete bat algorithm is constructed based on the idea of basic bat algorithm, which divide whole scheduling problem into many subscheduling problems and then NEH heuristic be introduced to solve subscheduling problem. Secondly, some subsequences are operated with certain probability in the pulse emission and loudness phases. An intensive virtual population neighborhood search is integrated into the discrete bat algorithm to further improve the performance. Finally, the experimental results show the suitability and efficiency of the present discrete bat algorithm for optimal permutation flow shop scheduling problem. PMID:25243220

  17. Discrete bat algorithm for optimal problem of permutation flow shop scheduling.

    PubMed

    Luo, Qifang; Zhou, Yongquan; Xie, Jian; Ma, Mingzhi; Li, Liangliang

    2014-01-01

    A discrete bat algorithm (DBA) is proposed for optimal permutation flow shop scheduling problem (PFSP). Firstly, the discrete bat algorithm is constructed based on the idea of basic bat algorithm, which divide whole scheduling problem into many subscheduling problems and then NEH heuristic be introduced to solve subscheduling problem. Secondly, some subsequences are operated with certain probability in the pulse emission and loudness phases. An intensive virtual population neighborhood search is integrated into the discrete bat algorithm to further improve the performance. Finally, the experimental results show the suitability and efficiency of the present discrete bat algorithm for optimal permutation flow shop scheduling problem.

  18. Two-machine flow shop scheduling integrated with preventive maintenance planning

    NASA Astrophysics Data System (ADS)

    Wang, Shijin; Liu, Ming

    2016-02-01

    This paper investigates an integrated optimisation problem of production scheduling and preventive maintenance (PM) in a two-machine flow shop with time to failure of each machine subject to a Weibull probability distribution. The objective is to find the optimal job sequence and the optimal PM decisions before each job such that the expected makespan is minimised. To investigate the value of integrated scheduling solution, computational experiments on small-scale problems with different configurations are conducted with total enumeration method, and the results are compared with those of scheduling without maintenance but with machine degradation, and individual job scheduling combined with independent PM planning. Then, for large-scale problems, four genetic algorithm (GA) based heuristics are proposed. The numerical results with several large problem sizes and different configurations indicate the potential benefits of integrated scheduling solution and the results also show that proposed GA-based heuristics are efficient for the integrated problem.

  19. A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna

    2003-01-01

    Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.

  20. A Master Plan for the Development of Vocational-Technical Education In New Mexico.

    ERIC Educational Resources Information Center

    Sterling Inst., Washington, DC.

    This master plan for vocational education in New Mexico is the result of a study conducted by professional education consultants. The following areas were examined during the study: (1) New Mexico's present manpower problems, (2) market trends of future industrial potential, (3) state resources capable of attracting new industry, (4) adequacy of…

  1. New Information Technology Directions for American Education. Improving Science and Mathematics Education. Final Report.

    ERIC Educational Resources Information Center

    Melmed, Arthur S.; Burnham, Robert A.

    This report is an analysis of the findings of four workshops exploring the ways interactive technology can be considered an option for improving American education after 25 years of research and development. Sections include: (1) "Manpower Needs and School Problems"; (2) "Science and Technology Option"; (3) "Barriers and Strategy"; and (4) "To…

  2. Motor Vehicle Repairs and Inspection Personnel--Manpower Development Program. Final Report, 1 July, 1968-31 December, 1969.

    ERIC Educational Resources Information Center

    McCutcheon, R. W.; And Others

    A perennial problem facing vocational educators is the need to correlate required on-the-job skills and knowledge with the instruction in the corresponding vocational education program. Using this as an objective, data were gathered on current automotive mechanic training programs by reviewing selected government reports and related literature and…

  3. Developing New Models of the COMP-LAB College Basic Writing Course for Other Settings. Final Report.

    ERIC Educational Resources Information Center

    Epes, Mary T.; And Others

    A course designed for college students with severe writing problems, especially those stemming from nonstandard speech patterns, was adapted to a variety of noncollege settings: two high schools, a labor union, a manpower training program, and the staff education department of a psychiatric hospital. Each setting attempted to integrate classroom…

  4. Shaping Computing and Information Processing as a Vital National Resource. (Keynote Address).

    ERIC Educational Resources Information Center

    Glaser, George

    New technical specialties are emerging within the computer industry at a rate threatening the ability of educational institutions to train those who would understand and apply them. The industry's ability to undertake more ambitious projects and to thereby solve more complex problems is limited by an inadequate force of skilled manpower. Thus, it…

  5. The Potential Transfer of Industrial Skills from Defense to Nondefense Industries. Volume 1.

    ERIC Educational Resources Information Center

    California State Dept. of Employment, Sacramento.

    Because of lack of knowledge of specific occupations in defense production, assessment of the impact of defense cutbacks on the economy has been difficult. This project was undertaken to determine which skills of industrial workers in missile production are transferable to nondefense industries and to anticipate manpower problems involved in mass…

  6. Manpower Information for Urban Poverty Areas.

    ERIC Educational Resources Information Center

    Levine, Louis; Norton, John Herbert

    A lack of data continues to hinder efforts to cure the problems of poverty areas. This project was designed to determine possible means to gather the needed data, so that program planners could make decisions based on facts rather than intuition. Although this is a case study of an inner-city poverty area of Philadelphia, the need for data and the…

  7. Medical Colleges in Saudi Arabia: Can We Predict Graduate Numbers?

    ERIC Educational Resources Information Center

    Althubaiti, Alaa; Alkhazim, Mohammad

    2014-01-01

    The shortage of Physicians is a major problem in many countries. Medical colleges are often encouraged to increase the graduate numbers. In the Kingdom of Saudi Arabia, Saudi physicians form only 37.89% of the physician manpower. The remainder of the physicians are expatriates. It was recently estimated that the Kingdom would need 29,128…

  8. Accounting for Special Revenue Sharing Grants. A Human Resource Management Course Monograph. No. 2 in a Series.

    ERIC Educational Resources Information Center

    Gunn, Sanford C.

    A training course to introduce students to the problems and accounting methods for Comprehensive Employment and Training Act (CETA) programs should consider four major areas. Within these areas certain objectives should be met: (1) to acquire background knowledge on manpower programs and typical fund accounting procedures, (2) to understand the…

  9. PROBLEMS AND PROMISE IN THE USE OF INDIGENOUS PERSONNEL.

    ERIC Educational Resources Information Center

    OTIS, JACK

    A SIGNIFICANT EXPANSION OF AUXILIARY PERSONNEL WILL BE CAUSED BY THE SOCIAL WORK MANPOWER SHORTAGE, THE ELIMINATION OF ROUTINE BLUE AND WHITE COLLAR JOBS BY AUTOMATION AND CYBERNATION, THE INCREASE IN NEW WORKERS IN A DECLINING LABOR MARKET FOR THE UNSKILLED AND THE SEMI-SKILLED, THE GROWTH OF FEDERAL PROGRAMS WHICH FUND THE ESTABLISHMENT OF NEW…

  10. Entrepreneurial Education in Nigeria Tertiary Institutions and Sustainable Development

    ERIC Educational Resources Information Center

    Agboola, B. M.

    2010-01-01

    The higher education in Nigeria has witnessed a tremendous growth in the last 50 years in terms of producing manpower that could bring about development. However, the problem of Nigeria today is not about human and natural resources, but how to translate the human potentials to meet the realization of its all round development and sustain economic…

  11. Manpower management information system /MIS/

    NASA Technical Reports Server (NTRS)

    Gravette, M. C.; King, W. L.

    1971-01-01

    System of programs capable of building and maintaining data bank provides all levels of management with regular manpower evaluation reports and data source for special management exercises on manpower.

  12. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  13. The Role of Education in the Supply and Demand of Educated Manpower. Research Memorandum.

    ERIC Educational Resources Information Center

    Young, Kan Hua

    This description of a methodology for examining the supply of educated manpower and the demand for their services consists of two major sections, which are devoted to the supply and demand of educated manpower respectively. In the first section, the supply of educated manpower and the demand for educational inputs are considered, the main…

  14. Manpower for Energy Research: A Comprehensive Manpower Information System for Energy Research, Development and Demonstration.

    ERIC Educational Resources Information Center

    Goldstein, Harold; And Others

    This publication is the result of a study commissioned by the Energy Research and Development Administration (ERDA) to design a manpower information system as indicated by the title. This study is designed to help ERDA (now the Department of Energy) meet its responsibility of helping to assure an adequate supply of manpower for the accomplishment…

  15. The Demand for Legal Assistants in Indiana. Indiana College-Level Manpower Study. Report Number Six.

    ERIC Educational Resources Information Center

    Greenberg, Robert M.; Tully, Richard B.

    The Indiana College-Level Manpower Study is being conducted by the Indiana Commission for Higher Education to provide manpower information of value to planning at the postsecondary level. Factors involving both manpower supply and demand are being investigated. This report deals with a survey assessing the demand for legal assistants in Indiana.…

  16. Health manpower development in Bayelsa State, Nigeria

    PubMed Central

    McFubara, Kalada G; Edoni, Elizabeth R; Ezonbodor-Akwagbe, Rose E

    2012-01-01

    Background: Health manpower is one of the critical factors in the development of a region. This is because health is an index of development. Bayelsa State has a low level of health manpower. Thus, in this study, we sought to identify factors necessary for effective development of health manpower. Methods: Three methods were used to gather information, ie, face-to-face interviews, postal surveys, and documentary analysis. Critical incidents were identified, and content and thematic analyses were conducted. Results: There is no full complement of a primary health care workforce in any of the health centers in the state. The three health manpower training institutions have the limitations of inadequate health care educators and other manpower training facilities, including lack of a teaching hospital. Conclusion: Accreditation of health manpower training institutions is a major factor for effective development of health manpower. Public officers can contribute to the accreditation process by subsuming their personal interest into the state’s common interest. Bayelsa is a fast-growing state and needs a critical mass of health care personnel. To develop this workforce requires a conscious effort rich in common interests in the deployment of resources. PMID:23271926

  17. Early Years of Neutron Scattering and Its Manpower Development in Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marsongkohadi

    In this paper I shall give a short history of the development of neutron scattering at the Research Centre for Nuclear Techniques (PPTN), in Bandung, and the early development of a more advanced facilities at the Neutron Scattering Laboratory (NSL BATAN), Centre of Technology for Nuclear Industrial Materials, in Serpong. The first research reactor in Indonesia was the TRIGA MARK II in Bandung, which became operational in 1965, with a power of 250 KW, upgraded to 1 MW in 1971, and to 2 MW in 2000. The neutron scattering activities was started in 1967, with the design and construction ofmore » the first powder diffractometer, and put in operation in 1970. It was followed by the second instrument, the filter detector spectrometer built in 1975 in collaboration with the Bhabha Atomic Research Centre (BARC), India. A powder diffractometer for magnetic studies was built in 1980, and finally, a modification of the filter detector spectrometer to measure textures was made in 1986. A brief description of the design and construction of the instruments, and a highlight of some research topics will be presented. Early developments of neutron scattering activities at the 30 MW, RSG-GAS reactor in Serpong in choosing suitable research program, which will be mainly centred around materials testing/characterization, and materials/condensed matter researches has been agreed. Instrument planning and layout which were appropriate to carry out the program had been decided. Manpower development for the neutron scattering laboratory is a severe problem. The efforts to overcome this problem has been solved. International Cooperation through workshops and on the job trainings also support the supply of qualified manpower.« less

  18. User requirements for a patient scheduling system

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.

    1979-01-01

    A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

  19. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  20. Manpower for the coal mining industry: an assessment of adequacy through the year 2000. Volume II. Technical approach. Final technical report. [USA; forecasting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mendis, M.S.; Rosenberg, J.I.; Medville, D.M.

    1980-03-01

    This report presents a summary of the analytical approach taken and the conclusions reached in an assessment of the supply and demand for manpower in the coal mining industry through the year 2000. A hybrid system dynamics/econometric model of the coal mining industry was developed which incorporates relationships between technological change, labor productivity, production costs, wages, graduation rates, and other key variables in estimating imbalances between labor supply and demand. Study results indicate that while the supply of production workers is expected to be sufficient under most future demand scenarios, periodic shortages of experienced workers, especially in the Northern Greatmore » Plains can be expected. Other study findings are that the supply of mining engineers will be sufficient under all but the highest coal demand scenario, a shortage of faculty will affect the supply of mining engineers in the near-term and the employment of mining technicians is expected to exhibit the largest increase in any labor category studied. In this volume the nature of the coal mining manpower problem is discussed, a detailed description of that analysis conducted and the sources of data used is provided, and the findings of the study are presented.« less

  1. Artificial intelligence approaches to astronomical observation scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  2. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  3. Manpower Planning for New Weapon Systems

    DTIC Science & Technology

    1978-12-01

    Logistics) take the following actions : 1. Institute formal, post-DSARC management reviews of integrated logistic support implementation to verify...that actions are being taken to minimize manpower and other support resource requirements. 2. Urge the Army, Navy and Marine Corps to press on with...examines how manpower planning actually is done by the military services, and recommends actions by the Assistant Secretary of Defense (Manpower Reserve

  4. Institutional Manpower Development and Training in New York State. Annual Report (July 1, 1970-June 30, 1971).

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Div. of Special Occupational Services.

    This annual report is the ninth in a series of reports concerning the activities of the New York State Education Department in the manpower training effort, and it offers a narrative description and rationale of the activities of the Bureaus of Manpower Program Development and Manpower Program Supervision during 1971. The goals of the manpower…

  5. Second Survey of Library and Information Manpower Needs in the Caribbean, Volume I. The Survey and Its Findings.

    ERIC Educational Resources Information Center

    Greene, Gloria; Robb, Reive

    The main concerns of this manpower survey were to examine and, where possible, modify and expand on the manpower planning model generated in the 1982 pilot study, and to use the model to assist with the forecasting of manpower requirements for library and information systems in the Caribbean region. Libraries and information systems in this area…

  6. Planning and Scheduling for Fleets of Earth Observing Satellites

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Jonsson, Ari; Morris, Robert; Smith, David E.; Norvig, Peter (Technical Monitor)

    2001-01-01

    We address the problem of scheduling observations for a collection of earth observing satellites. This scheduling task is a difficult optimization problem, potentially involving many satellites, hundreds of requests, constraints on when and how to service each request, and resources such as instruments, recording devices, transmitters, and ground stations. High-fidelity models are required to ensure the validity of schedules; at the same time, the size and complexity of the problem makes it unlikely that systematic optimization search methods will be able to solve them in a reasonable time. This paper presents a constraint-based approach to solving the Earth Observing Satellites (EOS) scheduling problem, and proposes a stochastic heuristic search method for solving it.

  7. Deep Space Network Scheduling Using Evolutionary Computational Methods

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seugnwon; Wang, Yeou-Fang; Terrile, Richard J.

    2007-01-01

    The paper presents the specific approach taken to formulate the problem in terms of gene encoding, fitness function, and genetic operations. The genome is encoded such that a subset of the scheduling constraints is automatically satisfied. Several fitness functions are formulated to emphasize different aspects of the scheduling problem. The optimal solutions of the different fitness functions demonstrate the trade-off of the scheduling problem and provide insight into a conflict resolution process.

  8. Enhanced Specification and Verification for Timed Planning

    DTIC Science & Technology

    2009-02-28

    Scheduling Problem The job-shop scheduling problem ( JSSP ) is a generic resource allocation problem in which common resources (“machines”) are required...interleaving of all processes Pi with the non-delay and mutual exclusion constraints: JSSP =̂ |||0<i6n Pi Where mutual-exclusion( JSSP ) For every complete...execution of JSSP (which terminates), its associated sched- ule S is a feasible schedule. An optimal schedule is a trace of JSSP with the minimum ending

  9. Improving Resource Selection and Scheduling Using Predictions. Chapter 1

    NASA Technical Reports Server (NTRS)

    Smith, Warren

    2003-01-01

    The introduction of computational grids has resulted in several new problems in the area of scheduling that can be addressed using predictions. The first problem is selecting where to run an application on the many resources available in a grid. Our approach to help address this problem is to provide predictions of when an application would start to execute if submitted to specific scheduled computer systems. The second problem is gaining simultaneous access to multiple computer systems so that distributed applications can be executed. We help address this problem by investigating how to support advance reservations in local scheduling systems. Our approaches to both of these problems are based on predictions for the execution time of applications on space- shared parallel computers. As a side effect of this work, we also discuss how predictions of application run times can be used to improve scheduling performance.

  10. Experiments with a decision-theoretic scheduler

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Holt, Gerhard; Mayer, Andrew

    1992-01-01

    This paper describes DTS, a decision-theoretic scheduler designed to employ state-of-the-art probabilistic inference technology to speed the search for efficient solutions to constraint-satisfaction problems. Our approach involves assessing the performance of heuristic control strategies that are normally hard-coded into scheduling systems, and using probabilistic inference to aggregate this information in light of features of a given problem. BPS, the Bayesian Problem-Solver, introduced a similar approach to solving single-agent and adversarial graph search problems, yielding orders-of-magnitude improvement over traditional techniques. Initial efforts suggest that similar improvements will be realizable when applied to typical constraint-satisfaction scheduling problems.

  11. Producing Satisfactory Solutions to Scheduling Problems: An Iterative Constraint Relaxation Approach

    NASA Technical Reports Server (NTRS)

    Chien, S.; Gratch, J.

    1994-01-01

    One drawback to using constraint-propagation in planning and scheduling systems is that when a problem has an unsatisfiable set of constraints such algorithms typically only show that no solution exists. While, technically correct, in practical situations, it is desirable in these cases to produce a satisficing solution that satisfies the most important constraints (typically defined in terms of maximizing a utility function). This paper describes an iterative constraint relaxation approach in which the scheduler uses heuristics to progressively relax problem constraints until the problem becomes satisfiable. We present empirical results of applying these techniques to the problem of scheduling spacecraft communications for JPL/NASA antenna resources.

  12. Knowledge and Policy in Manpower: A Study of the Manpower Research and Development Program in the Department of Labor.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Committee on Dept. of Labor Manpower Research and Development.

    The document presents an analysis of the progress in the research and development (R & D) efforts of the Department of Labor as embodied in the Manpower Development and Training Act, which combined an inquiry system and a mission-oriented operating system in a single agency. The analysis is presented in two parts. Part 1, The Manpower R &…

  13. Evaluation of Marine Corps Manpower Computer Simulation Model

    DTIC Science & Technology

    2016-12-01

    merit- based promotion selection that is in conjunction with the “up or out” manpower system. To ensure mission accomplishment within M&RA, it is...historical data the MSM pulls from an online Oracle database. Two types of data base pulls occur here: acquiring historical data of manpower pyramid...is based off of the assumption that the historical manpower progression is constant, and therefore is controllable. This unfortunately does not marry

  14. A New Lagrangian Relaxation Method Considering Previous Hour Scheduling for Unit Commitment Problem

    NASA Astrophysics Data System (ADS)

    Khorasani, H.; Rashidinejad, M.; Purakbari-Kasmaie, M.; Abdollahi, A.

    2009-08-01

    Generation scheduling is a crucial challenge in power systems especially under new environment of liberalization of electricity industry. A new Lagrangian relaxation method for unit commitment (UC) has been presented for solving generation scheduling problem. This paper focuses on the economical aspect of UC problem, while the previous hour scheduling as a very important issue is studied. In this paper generation scheduling of present hour has been conducted by considering the previous hour scheduling. The impacts of hot/cold start-up cost have been taken in to account in this paper. Case studies and numerical analysis presents significant outcomes while it demonstrates the effectiveness of the proposed method.

  15. Production scheduling with ant colony optimization

    NASA Astrophysics Data System (ADS)

    Chernigovskiy, A. S.; Kapulin, D. V.; Noskova, E. E.; Yamskikh, T. N.; Tsarev, R. Yu

    2017-10-01

    The optimum solution of the production scheduling problem for manufacturing processes at an enterprise is crucial as it allows one to obtain the required amount of production within a specified time frame. Optimum production schedule can be found using a variety of optimization algorithms or scheduling algorithms. Ant colony optimization is one of well-known techniques to solve the global multi-objective optimization problem. In the article, the authors present a solution of the production scheduling problem by means of an ant colony optimization algorithm. A case study of the algorithm efficiency estimated against some others production scheduling algorithms is presented. Advantages of the ant colony optimization algorithm and its beneficial effect on the manufacturing process are provided.

  16. Sensibility study in a flexible job shop scheduling problem

    NASA Astrophysics Data System (ADS)

    Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo

    2013-10-01

    This paper proposes the impact assessment of the jobs order in the optimal time of operations in a Flexible Job Shop Scheduling Problem. In this work a real assembly cell was studied: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France, which is considered as a Flexible Job Shop problem. The problem consists in finding the machines operations schedule, taking into account the precedence constraints. The main objective is to minimize the batch makespan, i.e. the finish time of the last operation completed in the schedule. Shortly, the present study consists in evaluating if the jobs order affects the optimal time of the operations schedule. The genetic algorithm was used to solve the optimization problem. As a conclusion, it's assessed that the jobs order influence the optimal time.

  17. [A preliminary study on dental-manpower forecasting model of Miyun County in Beijing].

    PubMed

    Huang, H; Wang, H; Yang, S

    1999-01-01

    To explore the dental-manpower forecasting model of Chinese rural region and provide references for Chinese dental-manpower researches. Chose rural Miyun County in Beijing as a sample, according to the need-based and demand-weighted forecasting method, a protocol WHO-CH model and corresponding JWG-6-M package developed by authors were used to calculate the present and future need and demand of dental-manpower in Miyun County. Further predications were also calculated on the effects of four modeling parameters to the demand of dental manpower. The present need and demand of oral care personnel for Miyun were 114.5 and 29.1 respectively. At present, Miyun has 43 oral care providers who can satisfy the demand but not the need. The change of oral health demand had a major effect on the forecast of the manpower. Dental-manpower planning should consider the need as a prime factor but must be modified by the demand. It was suggested that corresponding factors of oral care personnel need to be discussed further.

  18. Maintaining the Balance Between Manpower, Skill Levels, and PERSTEMPO

    DTIC Science & Technology

    2006-01-01

    requirement processes. Models and tools that integrate these dimensions would help crys- tallize issues, identify embedded assumptions , and surface...problems will change if the planning assumptions are incorrect or if the other systems are incapable of making the nec- essary adjustments. Static...Carrillo, Background and Theory Behind the Compensations, Accessions, and Personnel ( CAPM ) Model, Santa Monica, Calif.: RAND Corporation, MR-1667

  19. Shipboard Facilities Maintenance and Manpower Utilization: Problem and Approach

    DTIC Science & Technology

    1975-11-01

    sweeping, butting, polishing, lacquering, stenciling, vacuuming and shampooing , garbage disposal and trash removal, and all manner of sanitary and...spaces, passageways, heads and showers, crew lounge, mess decks, exterior deck and ship sides, and all office spaces; and limited facilities...maintenance in all passageways, heads , mess decks, office spaces, and berthing areas. They will also per- form sanitization and exterior deck and

  20. Social Work Education. Report of Master Plan Committee S.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield. Master Plan Committee.

    This report of the Master Plan Committee on Social Work Education is part of Phase III of the Illinois Statewide Master Plan for Higher Education dealing with graduate and professional education. Part I presents an overview. Part II gives a brief description of social work and a statement of the problem. In Part III the social work manpower in the…

  1. Study on Evaluation of Project Management Data for Decommissioning of Uranium Refining and Conversion Plant - 12234

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Usui, Hideo; Izumo, Sari; Tachibana, Mitsuo

    Some of nuclear facilities that would no longer be required have been decommissioned in JAEA (Japan Atomic Energy Agency). A lot of nuclear facilities have to be decommissioned in JAEA in near future. To implement decommissioning of nuclear facilities, it was important to make a rational decommissioning plan. Therefore, project management data evaluation system for dismantling activities (PRODIA code) has been developed, and will be useful for making a detailed decommissioning plan for an object facility. Dismantling of dry conversion facility in the uranium refining and conversion plant (URCP) at Ningyo-toge began in 2008. During dismantling activities, project management datamore » such as manpower and amount of waste generation have been collected. Such collected project management data has been evaluated and used to establish a calculation formula to calculate manpower for dismantling equipment of chemical process and calculate manpower for using a green house (GH) which was a temporary structure for preventing the spread of contaminants during dismantling. In the calculation formula to calculate project management data related to dismantling of equipment, the relation of dismantling manpower to each piece of equipment was evaluated. Furthermore, the relation of dismantling manpower to each chemical process was evaluated. The results showed promise for evaluating dismantling manpower with respect to each chemical process. In the calculation formula to calculate project management data related to use of the GH, relations of GH installation manpower and removal manpower to GH footprint were evaluated. Furthermore, the calculation formula for secondary waste generation was established. In this study, project management data related to dismantling of equipment and use of the GH were evaluated and analyzed. The project management data, manpower for dismantling of equipment, manpower for installation and removal of GH, and secondary waste generation from GH were considered. Establishment of the calculation formula for dismantling of each kind of equipment makes it possible to evaluate manpower for dismantling the whole facility. However, it is not easy to prepare calculation formula for all kinds of equipment that exist in the facility. Therefore, a simpler evaluation method was considered to calculate manpower based on facility characteristics. The results showed promise for evaluating dismantling manpower with respect to each chemical process. For dismantling of contaminated equipment, a GH has been used for protection of the spread of contamination. The use of a GH increases manpower for installation and removal of GH etc. Moreover, structural materials of the GH such as plastic sheets, adhesive tape become a burnable secondary waste. To create an effective dismantling plan, it is necessary to carefully consider use of a GH preliminarily. Thus, an evaluation method of project management data such as manpower and secondary waste generation was considered. The results showed promise for evaluating project management data of GH by using established calculation formula. (authors)« less

  2. Coordinating space telescope operations in an integrated planning and scheduling architecture

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  3. Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Yang, Jyh-Bin

    2017-10-01

    The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.

  4. Application of the HARDMAN methodology to the single channel ground-airborne radio system (SINCGARS)

    NASA Astrophysics Data System (ADS)

    Balcom, J.; Park, J.; Toomer, L.; Feng, T.

    1984-12-01

    The HARDMAN methodology is designed to assess the human resource requirements early in the weapon system acquisition process. In this case, the methodology was applied to the family of radios known as SINCGARS (Single Channel Ground-Airborne Radio System). At the time of the study, SINCGARS was approaching the Full-Scale Development phase, with 2 contractors in competition. Their proposed systems were compared with a composite baseline comparison (reference) system. The systems' manpower, personnel and training requirements were compared. Based on RAM data, the contractors' MPT figures showed a significant reduction from the figures derived for the baseline comparison system. Differences between the two contractors were relatively small. Impact and some tradeoff analyses were hindered by data access problems. Tactical radios, manpower and personnel requirements analysis, impact and tradeoff analysis, human resource sensitivity, training requirements analysis, human resources in LCSMM, and logistics analyses are discussed.

  5. Paediatric manpower: towards the 21st century.

    PubMed Central

    Appleyard, W J; Jackson, A D

    1988-01-01

    The British Paediatric Association (BPA) has carried out a national survey of paediatric medical manpower in the hospital and community child health services. The results of the survey relating to England and Wales are presented and compared with Department of Health and Social Security (DHSS) manpower statistics. On the basis of the survey findings and current trends in the pattern of paediatric care paediatric manpower requirements over the next 10 years are estimated. PMID:3178274

  6. Optimizing Maintenance Manpower for USMC F/A-18 Squadrons

    DTIC Science & Technology

    2016-06-01

    experience level, with the requirement of keeping a standard number of aircraft operationally ready. MVP results show areas of deficit, either manpower ...MAINTENANCE MANPOWER FOR USMC F/A-18 SQUADRONS by Kevin J. Goodwin June 2016 Thesis Co-Advisors: W. Matthew Carlyle Robert F. Dell Second...REPORT TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE OPTIMIZING MAINTENANCE MANPOWER FOR USMC F/A-18 SQUADRONS 5. FUNDING NUMBERS 6

  7. MATRIS Indexing and Retrieval Thesaurus (MIRT): Definitions of Indexing Terms

    DTIC Science & Technology

    1994-08-01

    use strategies ; may include simple manual systems for personnel management. • Bgc Marginal manpower utilization The utilization of various types of...resources. Bgg Manpower management evaluation Evaluation process including manpower plans, strategies , methods of execution, and decision making with...specialties. I I I I I I I I I U I I I I 6 MANPOWER I I I RECRUITMENT I C RECRUITMENT Process involving developing requirements and strategies for

  8. Further Evaluation of the Use of Multiple Schedules for Behavior Maintained by Negative Reinforcement.

    PubMed

    Campos, Claudia; Leon, Yanerys; Sleiman, Andressa; Urcuyo, Beatriz

    2017-03-01

    One potential limitation of functional communication training (FCT) is that after the functional communication response (FCR) is taught, the response may be emitted at high rates or inappropriate times. Thus, schedule thinning is often necessary. Previous research has demonstrated that multiple schedules can facilitate schedule thinning by establishing discriminative control of the communication response while maintaining low rates of problem behavior. To date, most applied research evaluating the clinical utility of multiple schedules has done so in the context of behavior maintained by positive reinforcement (e.g., attention or tangible items). This study examined the use of a multiple schedule with alternating Fixed Ratio (FR 1)/extinction (EXT) components for two individuals with developmental disabilities who emitted escape-maintained problem behavior. Although problem behavior remained low during all FCT and multiple schedule phases, the use of the multiple schedule alone did not result in discriminated manding.

  9. 32 CFR 44.5 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., before mobilization, conflicts between the mobilization manpower needs of the civilian sector and the... employers of Ready Reservists. (5) Coordinate conflicts between the mobilization manpower needs of the...) between the mobilization manpower needs of the civilian sector and the military. (3) Review...

  10. 32 CFR 44.5 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., before mobilization, conflicts between the mobilization manpower needs of the civilian sector and the... employers of Ready Reservists. (5) Coordinate conflicts between the mobilization manpower needs of the...) between the mobilization manpower needs of the civilian sector and the military. (3) Review...

  11. 75 FR 59236 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Warrior Care and Recovery Transition Coordination Program System Solution SYSTEM LOCATION: Manpower Information Systems Technology Branch, Manpower Information Systems Division, Manpower and Reserve Affairs... analysis, tracking, reporting, evaluating program effectiveness and conducting research. ROUTINE USES OF...

  12. 32 CFR 44.5 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., before mobilization, conflicts between the mobilization manpower needs of the civilian sector and the... employers of Ready Reservists. (5) Coordinate conflicts between the mobilization manpower needs of the...) between the mobilization manpower needs of the civilian sector and the military. (3) Review...

  13. 32 CFR 44.5 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., before mobilization, conflicts between the mobilization manpower needs of the civilian sector and the... employers of Ready Reservists. (5) Coordinate conflicts between the mobilization manpower needs of the...) between the mobilization manpower needs of the civilian sector and the military. (3) Review...

  14. 32 CFR 44.5 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., before mobilization, conflicts between the mobilization manpower needs of the civilian sector and the... employers of Ready Reservists. (5) Coordinate conflicts between the mobilization manpower needs of the...) between the mobilization manpower needs of the civilian sector and the military. (3) Review...

  15. Fractional Programming for Communication Systems—Part II: Uplink Scheduling via Matching

    NASA Astrophysics Data System (ADS)

    Shen, Kaiming; Yu, Wei

    2018-05-01

    This two-part paper develops novel methodologies for using fractional programming (FP) techniques to design and optimize communication systems. Part I of this paper proposes a new quadratic transform for FP and treats its application for continuous optimization problems. In this Part II of the paper, we study discrete problems, such as those involving user scheduling, which are considerably more difficult to solve. Unlike the continuous problems, discrete or mixed discrete-continuous problems normally cannot be recast as convex problems. In contrast to the common heuristic of relaxing the discrete variables, this work reformulates the original problem in an FP form amenable to distributed combinatorial optimization. The paper illustrates this methodology by tackling the important and challenging problem of uplink coordinated multi-cell user scheduling in wireless cellular systems. Uplink scheduling is more challenging than downlink scheduling, because uplink user scheduling decisions significantly affect the interference pattern in nearby cells. Further, the discrete scheduling variable needs to be optimized jointly with continuous variables such as transmit power levels and beamformers. The main idea of the proposed FP approach is to decouple the interaction among the interfering links, thereby permitting a distributed and joint optimization of the discrete and continuous variables with provable convergence. The paper shows that the well-known weighted minimum mean-square-error (WMMSE) algorithm can also be derived from a particular use of FP; but our proposed FP-based method significantly outperforms WMMSE when discrete user scheduling variables are involved, both in term of run-time efficiency and optimizing results.

  16. The Ames-Lockheed orbiter processing scheduling system

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Gargan, Robert

    1991-01-01

    A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

  17. An investigation of the use of temporal decomposition in space mission scheduling

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley E.; Narayanan, Venkat

    1994-01-01

    This research involves an examination of techniques for solving scheduling problems in long-duration space missions. The mission timeline is broken up into several time segments, which are then scheduled incrementally. Three methods are presented for identifying the activities that are to be attempted within these segments. The first method is a mathematical model, which is presented primarily to illustrate the structure of the temporal decomposition problem. Since the mathematical model is bound to be computationally prohibitive for realistic problems, two heuristic assignment procedures are also presented. The first heuristic method is based on dispatching rules for activity selection, and the second heuristic assigns performances of a model evenly over timeline segments. These heuristics are tested using a sample Space Station mission and a Spacelab mission. The results are compared with those obtained by scheduling the missions without any problem decomposition. The applicability of this approach to large-scale mission scheduling problems is also discussed.

  18. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  19. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  20. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  1. Genetic algorithm parameters tuning for resource-constrained project scheduling problem

    NASA Astrophysics Data System (ADS)

    Tian, Xingke; Yuan, Shengrui

    2018-04-01

    Project Scheduling Problem (RCPSP) is a kind of important scheduling problem. To achieve a certain optimal goal such as the shortest duration, the smallest cost, the resource balance and so on, it is required to arrange the start and finish of all tasks under the condition of satisfying project timing constraints and resource constraints. In theory, the problem belongs to the NP-hard problem, and the model is abundant. Many combinatorial optimization problems are special cases of RCPSP, such as job shop scheduling, flow shop scheduling and so on. At present, the genetic algorithm (GA) has been used to deal with the classical RCPSP problem and achieved remarkable results. Vast scholars have also studied the improved genetic algorithm for the RCPSP problem, which makes it to solve the RCPSP problem more efficiently and accurately. However, for the selection of the main parameters of the genetic algorithm, there is no parameter optimization in these studies. Generally, we used the empirical method, but it cannot ensure to meet the optimal parameters. In this paper, the problem was carried out, which is the blind selection of parameters in the process of solving the RCPSP problem. We made sampling analysis, the establishment of proxy model and ultimately solved the optimal parameters.

  2. Application of decentralized cooperative problem solving in dynamic flexible scheduling

    NASA Astrophysics Data System (ADS)

    Guan, Zai-Lin; Lei, Ming; Wu, Bo; Wu, Ya; Yang, Shuzi

    1995-08-01

    The object of this study is to discuss an intelligent solution to the problem of task-allocation in shop floor scheduling. For this purpose, the technique of distributed artificial intelligence (DAI) is applied. Intelligent agents (IAs) are used to realize decentralized cooperation, and negotiation is realized by using message passing based on the contract net model. Multiple agents, such as manager agents, workcell agents, and workstation agents, make game-like decisions based on multiple criteria evaluations. This procedure of decentralized cooperative problem solving makes local scheduling possible. And by integrating such multiple local schedules, dynamic flexible scheduling for the whole shop floor production can be realized.

  3. [The improvement of manpower support of municipal hospitals].

    PubMed

    Plutnitskiy, A N

    2013-01-01

    The article demonstrates the importance of analysis of improvement of implementation of manpower support of municipal hospitals in the framework of development of planning their activities. The optimal identification of demand in manpower and other types of resources is considered.

  4. Manpower Planning: The Need for a Diagnostic Approach.

    ERIC Educational Resources Information Center

    Fyfe, John

    1980-01-01

    Makes observations about progress in the field of manpower planning in highly industrialized and developed countries. Discusses the internal and external labor market, the state of the art of manpower planning at the micro level, and an economic framework. (CT)

  5. Genetic algorithm to solve the problems of lectures and practicums scheduling

    NASA Astrophysics Data System (ADS)

    Syahputra, M. F.; Apriani, R.; Sawaluddin; Abdullah, D.; Albra, W.; Heikal, M.; Abdurrahman, A.; Khaddafi, M.

    2018-02-01

    Generally, the scheduling process is done manually. However, this method has a low accuracy level, along with possibilities that a scheduled process collides with another scheduled process. When doing theory class and practicum timetable scheduling process, there are numerous problems, such as lecturer teaching schedule collision, schedule collision with another schedule, practicum lesson schedules that collides with theory class, and the number of classrooms available. In this research, genetic algorithm is implemented to perform theory class and practicum timetable scheduling process. The algorithm will be used to process the data containing lists of lecturers, courses, and class rooms, obtained from information technology department at University of Sumatera Utara. The result of scheduling process using genetic algorithm is the most optimal timetable that conforms to available time slots, class rooms, courses, and lecturer schedules.

  6. Decision-theoretic control of EUVE telescope scheduling

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1993-01-01

    This paper describes a decision theoretic scheduler (DTS) designed to employ state-of-the-art probabilistic inference technology to speed the search for efficient solutions to constraint-satisfaction problems. Our approach involves assessing the performance of heuristic control strategies that are normally hard-coded into scheduling systems and using probabilistic inference to aggregate this information in light of the features of a given problem. The Bayesian Problem-Solver (BPS) introduced a similar approach to solving single agent and adversarial graph search patterns yielding orders-of-magnitude improvement over traditional techniques. Initial efforts suggest that similar improvements will be realizable when applied to typical constraint-satisfaction scheduling problems.

  7. Design tool for multiprocessor scheduling and evaluation of iterative dataflow algorithms

    NASA Technical Reports Server (NTRS)

    Jones, Robert L., III

    1995-01-01

    A graph-theoretic design process and software tool is defined for selecting a multiprocessing scheduling solution for a class of computational problems. The problems of interest are those that can be described with a dataflow graph and are intended to be executed repetitively on a set of identical processors. Typical applications include signal processing and control law problems. Graph-search algorithms and analysis techniques are introduced and shown to effectively determine performance bounds, scheduling constraints, and resource requirements. The software tool applies the design process to a given problem and includes performance optimization through the inclusion of additional precedence constraints among the schedulable tasks.

  8. 75 FR 16760 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... unless comments are received which result in a contrary determination. ADDRESSES: You may submit comments... (MCMPS) Records System Location: Headquarters Marine Corps (HQMC) Manpower Information Systems Division...), and Manpower Management Force Augmentation (MMFA), Manpower and Reserve Affairs (M&RA), HQMC personnel...

  9. Development of a Prototype Contingency Plan Suitable for Use by FEMA (federal Emergency Management Agency) in Coordinating the Wartime Allocation of Health Manpower between the Military and Civilian Sectors

    DTIC Science & Technology

    1983-09-30

    UNCLASSIFIED SECl’IKTY CLASm;IFICATION OF THIS PAGE (When Dato Entered) REPORT DOCUMENTATION PAGE READ ISTRUCTONSBEFORE COMPLETING FORM 1. REPORT...Civilian Health Manpower Requirements Data ... .................. 4.6 4.3.5 Civilian Health Manpower Supply Data . . 4.7 4.4 Gata Base Creation and...reaeral *agencies involved. What is required is the development of adequate data bases for the civilian sector health manpower supply and requirements

  10. Manpower goals in American surgery. Implications for residency training. Future surgical manpower in the framework of total United States physicians.

    PubMed Central

    Moore, F D

    1976-01-01

    Constraints on manpower are intrinsic in the establishment of standards of excellence. When such constraints are exerted by individual Boards, Societies, Colleges or Academies they should act to improve the quality of care; their weakness lies in their lack of control over non-members, or those who have failed to pass the examinations. Such manpower constraints become specific objectives or goals when the number of accredited specialists is specifically related to the size of the population served. Any such manpower planning must recognize the many uncertainties in the future of American medicine, and maintain wide elasticity in the planning process. Social and economic pressures render the consideration of specific manpower goals essential at this time. Data from the national surgical study (SOSSUS) make it possible to consider such goals. Manpower objectives for surgery or any other branch of medicine should be considered as a part of the total medical manpower outlook for the United States. Pressures to reduce the number of surgeons entering practice are notable at this time. These should be evaluated against other pressures to maintain or increase the number of hospital-based specialists in all fields as the total number of practitioners undergoes a major expansion over the next 25 years, and the pressure for specialty care is thereby increased. A reasonable balance between these two pressures would be a manpower goal for surgery that allowed a modest growth rate over the next 25-50 years. An example of such is the goal of limiting surgical practitioner growth to a 1% increase in the ratio to population, every 5 years. This would be in sharp contrast to the continuous explosive growth of numbers of surgeons, since World War II. PMID:952562

  11. International Joint Seminar on Geographical and Occupational Mobility of Manpower (Castelfusano, November 19-22, 1963). Final Report. International Seminars 1963.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France). Social Affairs Div.

    Representatives of employers' and workers' organizations from 16 member countries met to analyze the problems of facilitating adjustment to geographical and occupational changes, to discuss their experience, and to study the type of overall program needed in this field. The report contains (1) an introduction to the Seminar by Solomon Barkin, (2)…

  12. LEADERSHIP FOR VOCATIONAL EDUCATION IN CALIFORNIA--THEORY AND PRACTICE OF PROGRAM DEVELOPMENT, SUMMARY REPORT OF THE COASTAL, CENTRAL, AND SOUTHERN REGIONAL CONFERENCES (JANUARY-FEBRUARY, 1966).

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Vocational Education Services.

    APPROXIMATELY 100 SUPERVISORS AND COORDINATORS OF PUBLIC SCHOOL VOCATIONAL EDUCATION PROGRAMS IN CALIFORNIA PARTICIPATED IN TWO CONFERENCES TO CONSIDER THE METHODS OF LABOR FORCE ENUMERATION, THE ASPECTS OF THE LABOR SITUATION MOST PERTINENT TO CHANGES IN VOCATIONAL EDUCATION, THE PROBLEMS OF WORKING WITH MANPOWER DATA, AND THE SALIENT FEATURES OF…

  13. Aerospace Employment Project: Finding New Careers in Local Government for Unemployed Engineers and Scientists. Final Report.

    ERIC Educational Resources Information Center

    United States Conference of Mayors, Washington, DC.

    "If we can put a man on the moon, why can't we solve the problems of our cities?" The demand for urban services and the manpower needs of local governments were increasing dramatically. Skilled professional personnel were unemployed. The Aerospace Employment Project was set up as a special pilot project to test whether unemployed professional…

  14. How Much Does Medical Education Cost? A Review. Health Manpower Policy Discussion Paper Series No. A3.

    ERIC Educational Resources Information Center

    MacBride, Owen

    This survey of studies of medical school costs was made in order to evaluate and compare the methodologies and findings of those studies. The survey covered studies of one or more medical schools that either produced figures for average annual per-student cost of education and/or discussed the methodologies and problems involved in producing such…

  15. Reserve Compensation System Study

    DTIC Science & Technology

    1978-06-30

    exactly the same manner as active duty CPY. Because Training Pay is based upon the three cash elements, rather than basic pay alone, the exercise ...controversial. • Planned improvements to the Defense Forre Planning Data Base do not include: r.oftware to interface with the per- sonnel...systems for future. Based on its findings of manpower shortfalls, overages and problems in specific areas in both officer and enlisted ranks, the

  16. Designing a fuzzy scheduler for hard real-time systems

    NASA Technical Reports Server (NTRS)

    Yen, John; Lee, Jonathan; Pfluger, Nathan; Natarajan, Swami

    1992-01-01

    In hard real-time systems, tasks have to be performed not only correctly, but also in a timely fashion. If timing constraints are not met, there might be severe consequences. Task scheduling is the most important problem in designing a hard real-time system, because the scheduling algorithm ensures that tasks meet their deadlines. However, the inherent nature of uncertainty in dynamic hard real-time systems increases the problems inherent in scheduling. In an effort to alleviate these problems, we have developed a fuzzy scheduler to facilitate searching for a feasible schedule. A set of fuzzy rules are proposed to guide the search. The situation we are trying to address is the performance of the system when no feasible solution can be found, and therefore, certain tasks will not be executed. We wish to limit the number of important tasks that are not scheduled.

  17. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  18. Improving Hospital-wide Patient Scheduling Decisions by Clinical Pathway Mining.

    PubMed

    Gartner, Daniel; Arnolds, Ines V; Nickel, Stefan

    2015-01-01

    Recent research has highlighted the need for solving hospital-wide patient scheduling problems. Inpatient scheduling, patient activities have to be scheduled on scarce hospital resources such that temporal relations between activities (e.g. for recovery times) are ensured. Common objectives are, among others, the minimization of the length of stay (LOS). In this paper, we consider a hospital-wide patient scheduling problem with LOS minimization based on uncertain clinical pathways. We approach the problem in three stages: First, we learn most likely clinical pathways using a sequential pattern mining approach. Second, we provide a mathematical model for patient scheduling and finally, we combine the two approaches. In an experimental study carried out using real-world data, we show that our approach outperforms baseline approaches on two metrics.

  19. ENGINEERING MANPOWER BULLETIN NUMBER 9.

    ERIC Educational Resources Information Center

    ALDEN, JOHN D.

    DESIGNED TO INFORM LEADERS IN INDUSTRY, GOVERNMENT, AND EDUCATION, WHOSE RESPONSIBILITY INCLUDES AWARENESS OF ENGINEERING MANPOWER DEVELOPMENTS, THIS BULLETIN REPORTS A STUDY CONDUCTED BY THE ENGINEERING MANPOWER COMMISSION OF ENGINEERS IN THE ARMED SERVICES. THE WORK OF THE COMMISSION IS TO ASSURE THE MOST EFFECTIVE UTILIZATION OF ENGINEERING…

  20. Private and Public Manpower Policies to Stimulate Productivity.

    ERIC Educational Resources Information Center

    Ginzberg, Eli; And Others

    Realizing the relationship of productivity to technological, organizational, and manpower variables, and the need to improve and increase production gains, this document examines existing public and private entrepreneurial and industrial relations structures in an effort to ascertain manpower policy measures which if strengthened or introduced…

  1. Manpower Targets and Educational Investments

    ERIC Educational Resources Information Center

    Ritzen, Jo M.

    1976-01-01

    Discusses the use of quadratic programming to calculate the optimal distribution of educational investments required to closely approach manpower targets when financial resources are insufficient to meet manpower targets completely. Demonstrates use of the quadratic programming approach by applying it to the training of supervisory technicians in…

  2. A new parallel DNA algorithm to solve the task scheduling problem based on inspired computational model.

    PubMed

    Wang, Zhaocai; Ji, Zuwen; Wang, Xiaoming; Wu, Tunhua; Huang, Wei

    2017-12-01

    As a promising approach to solve the computationally intractable problem, the method based on DNA computing is an emerging research area including mathematics, computer science and molecular biology. The task scheduling problem, as a well-known NP-complete problem, arranges n jobs to m individuals and finds the minimum execution time of last finished individual. In this paper, we use a biologically inspired computational model and describe a new parallel algorithm to solve the task scheduling problem by basic DNA molecular operations. In turn, we skillfully design flexible length DNA strands to represent elements of the allocation matrix, take appropriate biological experiment operations and get solutions of the task scheduling problem in proper length range with less than O(n 2 ) time complexity. Copyright © 2017. Published by Elsevier B.V.

  3. A hybrid online scheduling mechanism with revision and progressive techniques for autonomous Earth observation satellite

    NASA Astrophysics Data System (ADS)

    Li, Guoliang; Xing, Lining; Chen, Yingwu

    2017-11-01

    The autonomicity of self-scheduling on Earth observation satellite and the increasing scale of satellite network attract much attention from researchers in the last decades. In reality, the limited onboard computational resource presents challenge for the online scheduling algorithm. This study considered online scheduling problem for a single autonomous Earth observation satellite within satellite network environment. It especially addressed that the urgent tasks arrive stochastically during the scheduling horizon. We described the problem and proposed a hybrid online scheduling mechanism with revision and progressive techniques to solve this problem. The mechanism includes two decision policies, a when-to-schedule policy combining periodic scheduling and critical cumulative number-based event-driven rescheduling, and a how-to-schedule policy combining progressive and revision approaches to accommodate two categories of task: normal tasks and urgent tasks. Thus, we developed two heuristic (re)scheduling algorithms and compared them with other generally used techniques. Computational experiments indicated that the into-scheduling percentage of urgent tasks in the proposed mechanism is much higher than that in periodic scheduling mechanism, and the specific performance is highly dependent on some mechanism-relevant and task-relevant factors. For the online scheduling, the modified weighted shortest imaging time first and dynamic profit system benefit heuristics outperformed the others on total profit and the percentage of successfully scheduled urgent tasks.

  4. Turnaround operations analysis for OTV. Volume 2: Detailed technical report

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The objectives and accomplishments were to adapt and apply the newly created database of Shuttle/Centaur ground operations. Previously defined turnaround operations analyses were to be updated for ground-based OTVs (GBOTVs) and space-based OTVs (SBOTVs), design requirements identified for both OTV and Space Station accommodations hardware, turnaround operations costs estimated, and a technology development plan generated to develop the required capabilities. Technical and programmatic data were provided for NASA pertinent to OTV round and space operations requirements, turnaround operations, task descriptions, timelines and manpower requirements, OTV modular design and booster and Space Station interface requirements. SBOTV accommodations development schedule, cost and turnaround operations requirements, and a technology development plan for ground and space operations and space-based accommodations facilities and support equipment. Significant conclusion are discussed.

  5. 1974 Rural Manpower Report. [North Dakota].

    ERIC Educational Resources Information Center

    North Dakota State Employment Security Bureau, Bismarck. Employment Service Div.

    The North Dakota Employment Security Bureau provides equality of services in all programs administered by the Bureau to rural area residents throughout the State. It also provides services to agriculture, business, government, and workers in meeting their employment and manpower needs. The Supervisor of Rural Manpower Services provides supervision…

  6. Neurology Manpower--A Survey. NINCDS Monograph No. 16.

    ERIC Educational Resources Information Center

    American Neurological Association, Miami, FL.

    The three-year neurology manpower study reported here was directed toward (1) identifying the presently available neurological manpower and the demographic and professional characteristics of neurologists and neurologists-in-training in the United States as of 1971; (2) determining the current and emerging patterns for utilizing neurological…

  7. Report of the National Advisory Commission on Health Manpower. Volume 1.

    ERIC Educational Resources Information Center

    National Advisory Commission on Health Manpower, Washington, DC.

    In 1966, the President established the National Advisory Commission on Health Manpower to "develop appropriate recommendations for action by government or by private institutions, organizations, or individuals for improving the availability and utilization of health manpower." Recommendations include: (1) federal funds to encourage…

  8. Prince Edward Island Newstarts' Comprehensive Manpower Development System.

    ERIC Educational Resources Information Center

    Connor, Thomas R.

    1971-01-01

    An approach to new methods of helping disadvantaged people gain employment taken by Prince Edward Island Newstart is outlined. This approach is a Comprehensive Manpower Development System. The major components of the system consist of: (1) variants of some standard manpower training programs, (2) innovative recruitment and assignment techniques,…

  9. San Miguel County, New Mexico. A Report on Manpower Resources.

    ERIC Educational Resources Information Center

    New Mexico State Employment Service, Santa Fe.

    The Smaller Communities Program of Employment Security Offices furnishes manpower services to remote, low-income areas of New Mexico and makes comprehensive studies of the manpower and other resources which the community can use for expanding job opportunities. Other objectives include enumerating the unemployed, underemployed, and those wishing…

  10. Manpower Research and Development Projects; 1973 Edition.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    The third edition of Manpower Research and Development Projects presents descriptions of 455 projects which are grouped by subject matter to facilitate description of the research and development program and the use of the material. The 199 doctoral dissertation grants and the 12 manpower research institutional grants are classified by subject…

  11. [The actual issues of development of manpower potential in health care].

    PubMed

    Belostotskii, A V; Gridnev, O V; Grishina, N K; Znachkova, E A

    2016-01-01

    The analysis was implemented concerning main directions of development of health care manpower policy in Moscow. The activities are established related to improvement of actual situation with development of potential of medical personnel, increasing of motivation ofphysicians and paramedical personnel, improvement of conditions of development of manpower resources.

  12. 1973 Rural Manpower Report. [North Dakota]. ES-225F.

    ERIC Educational Resources Information Center

    North Dakota State Employment Security Bureau, Bismarck. Employment Service Div.

    The Rural Manpower Service's objective is to provide the State's rural people "equity of access" to all programs administered by the North Dakota Employment Security Bureau. It provides services to agriculture, business, government, and workers in meeting their employment and manpower needs. Functional supervision and direction to the…

  13. Information Manpower Forecasting. Papers Presented at the FID/ET Seminar (Espoo, Finland, August 24-27, 1988).

    ERIC Educational Resources Information Center

    Dosa, Marta L., Ed.; Froehlich, Thomas J., Ed.

    This collection contains 20 papers written by educators, administrators and information scientists who had conducted manpower surveys in the library and information fields: (1) "Background and Evolution of Educational Planning and Forecasting for Information Manpower" (Yves Courrier); (2) "Indicators for the Emerging Information…

  14. Engineering Manpower and Education: Foundation for Future Competitiveness.

    ERIC Educational Resources Information Center

    Business-Higher Education Forum, Washington, DC.

    Important issues, approaches, and options pertaining to supply and utilization of engineering manpower in the United States are outlined. An overview is presented of ongoing engineering manpower surveys, projections, and patterns, with particular emphasis on activities and trends of the past 2 years. Attention is also directed to manpower…

  15. Counselor's Guide to Manpower Information; An Annotated Bibliography of Government Publications.

    ERIC Educational Resources Information Center

    Smith, Gerard C.

    This selected bibliography of materials published by all Federal and many state agencies from 1962 to 1968 is divided into four sections. One deals with occupational and industry manpower literature, including occupational outlook service information, occupational and industry manpower studies, job descriptions, and Federal government careers. The…

  16. Agri-Manpower Forecasting and Educational Planning

    ERIC Educational Resources Information Center

    Ramarao, D.; Agrawal, Rashmi; Rao, B. V. L. N.; Nanda, S. K.; Joshi, Girish P.

    2014-01-01

    Purpose: Developing countries need to plan growth or expansion of education so as to provide required trained manpower for different occupational sectors. The paper assesses supply and demand of professional manpower in Indian agriculture and the demands are translated in to educational requirements. Methodology: The supply is assessed from the…

  17. Model Special Education Manpower Information and Management System. Final Report.

    ERIC Educational Resources Information Center

    Gilles, Cynthia

    The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…

  18. Manpower Planning, Rate of Return Analysis, and the University Medical Schools: The Case of Australia

    ERIC Educational Resources Information Center

    Davis, Denis J.

    1977-01-01

    Some of the errors in educational planning that arise from manpower forecasts are examined using the Australian doctors manpower plan, 1975-91 as an illustration. The large variation in results that can occur through the substitution of alternatively feasible coefficients is shown. (Editor/LBH)

  19. Toward Middle-Level Manpower Education for Colombia. A Report to USAID Colombia.

    ERIC Educational Resources Information Center

    Johnson, B. Lamar

    Education for middle-level manpower, a high-priority need in Colombia, is discussed. The current programs of five educational agencies--universities, university institutes, SENA (National Apprentice Service), industrial schools, and agricultural schools--that are providing some preparation for middle-level manpower positions are described. A…

  20. 76 FR 54793 - Westpoint Home, Inc., Manufacturing Division, Including On-Site Leased Workers from Manpower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... Home, Inc., Manufacturing Division, Including On-Site Leased Workers from Manpower, Greenville, AL; Westpoint Home, Inc., Distribution Center, Including On-Site Leased Workers from Manpower, Greenville, AL..., applicable to workers of WestPoint Home, Inc., Manufacturing Division, Greenville, Alabama and WestPoint Home...

  1. Allied Health Occupations Project, Title I, Phase I.

    ERIC Educational Resources Information Center

    Jensen, Mary E.

    This community college investigated the demand and supply of health manpower needs in the community for purposes of developing and implementing appropriate programs for the college. A three-part questionnaire was prepared to gather data on manpower needs, educational programs, and prospective educational consumers. Manpower needs and existing…

  2. The Application of Cost-Benefit Analysis in Manpower Area.

    ERIC Educational Resources Information Center

    Barsby, Steven L.

    The relative efficiency of various manpower programs as seen through cost-benefit analysis is assessed, and the contribution that cost-benefit analysis has made in evaluating manpower programs is discussed, taking into account a variety of methodologies presented in different studies. Vocational rehabilitation appears to yield the highest…

  3. Louisiana Annual Rural Manpower Report. ES-225, 1972.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Employment Security, Baton Rouge

    The Rural Manpower Service Section of the Louisiana Department of Employment Security provided recruitment, placement, and other Employment Service programs to the agricultural and rural non-agricultural populations. Goals of the Rural Manpower Service were to: serve the agricultural workers and rural population in accordance with existing Federal…

  4. Manpower and project planning

    NASA Technical Reports Server (NTRS)

    Johnson, David W.

    1991-01-01

    The purpose was to study how manpower and projects are planned at the Facilities Engineering Division (FENGD) within the Systems Engineering and Operations Directorate of the LaRC and to make recommendations for improving the effectiveness and productivity ot the tools that are used. The existing manpower and project planning processes (including the management plan for the FENGD, existing manpower planning reports, project reporting to LaRC and NASA Headquarters, employee time reporting, financial reporting, and coordination/tracking reports for procurement) were discussed with several people, and project planning software was evaluated.

  5. Smithsonian’s Manpower Research and Advisory Services: a 22-Year Partnership with the Office of Naval Research

    DTIC Science & Technology

    1994-04-01

    AD-A278 487 /-,I1111il~11 11 11 h Illlll SMITHSONIAN’S MANPOWER RESEARCH AND ADVISORY SERVICES: A 22-YEAR PARTNERSHIP WITH THE OFFICE OF NAVAL...Manpower, Personnel and Training R&D Program of the Office of Naval Research under Contract N00014-93- C-0129. Approved for public release; distribution...SMITHSONIAN’S MANPOWER RESEARCH AND ADVISORY SERVICES: A 22-YEAR PARTNERSHIP WITH THE OFFICE OF NAVAL RESEARCH H. Wallace Sinaiko Final Report April

  6. Estimating psychiatric manpower requirements based on patients' needs.

    PubMed

    Faulkner, L R; Goldman, C R

    1997-05-01

    To provide a better understanding of the complexities of estimating psychiatric manpower requirements, the authors describe several approaches to estimation and present a method based on patients' needs. A five-step method for psychiatric manpower estimation is used, with estimates of data pertinent to each step, to calculate the total psychiatric manpower requirements for the United States. The method is also used to estimate the hours of psychiatric service per patient per year that might be available under current psychiatric practice and under a managed care scenario. Depending on assumptions about data at each step in the method, the total psychiatric manpower requirements for the U.S. population range from 2,989 to 358,696 full-time-equivalent psychiatrists. The number of available hours of psychiatric service per patient per year is 14.1 hours under current psychiatric practice and 2.8 hours under the managed care scenario. The key to psychiatric manpower estimation lies in clarifying the assumptions that underlie the specific method used. Even small differences in assumptions mean large differences in estimates. Any credible manpower estimation process must include discussions and negotiations between psychiatrists, other clinicians, administrators, and patients and families to clarify the treatment needs of patients and the roles, responsibilities, and job description of psychiatrists.

  7. Discrete harmony search algorithm for scheduling and rescheduling the reprocessing problems in remanufacturing: a case study

    NASA Astrophysics Data System (ADS)

    Gao, Kaizhou; Wang, Ling; Luo, Jianping; Jiang, Hua; Sadollah, Ali; Pan, Quanke

    2018-06-01

    In this article, scheduling and rescheduling problems with increasing processing time and new job insertion are studied for reprocessing problems in the remanufacturing process. To handle the unpredictability of reprocessing time, an experience-based strategy is used. Rescheduling strategies are applied for considering the effect of increasing reprocessing time and the new subassembly insertion. To optimize the scheduling and rescheduling objective, a discrete harmony search (DHS) algorithm is proposed. To speed up the convergence rate, a local search method is designed. The DHS is applied to two real-life cases for minimizing the maximum completion time and the mean of earliness and tardiness (E/T). These two objectives are also considered together as a bi-objective problem. Computational optimization results and comparisons show that the proposed DHS is able to solve the scheduling and rescheduling problems effectively and productively. Using the proposed approach, satisfactory optimization results can be achieved for scheduling and rescheduling on a real-life shop floor.

  8. Solving multi-objective job shop scheduling problems using a non-dominated sorting genetic algorithm

    NASA Astrophysics Data System (ADS)

    Piroozfard, Hamed; Wong, Kuan Yew

    2015-05-01

    The efforts of finding optimal schedules for the job shop scheduling problems are highly important for many real-world industrial applications. In this paper, a multi-objective based job shop scheduling problem by simultaneously minimizing makespan and tardiness is taken into account. The problem is considered to be more complex due to the multiple business criteria that must be satisfied. To solve the problem more efficiently and to obtain a set of non-dominated solutions, a meta-heuristic based non-dominated sorting genetic algorithm is presented. In addition, task based representation is used for solution encoding, and tournament selection that is based on rank and crowding distance is applied for offspring selection. Swapping and insertion mutations are employed to increase diversity of population and to perform intensive search. To evaluate the modified non-dominated sorting genetic algorithm, a set of modified benchmarking job shop problems obtained from the OR-Library is used, and the results are considered based on the number of non-dominated solutions and quality of schedules obtained by the algorithm.

  9. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  10. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  11. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  12. What work schedule characteristics constitute a problem to the individual? A representative study of Swedish shift workers.

    PubMed

    Åkerstedt, Torbjörn; Kecklund, Göran

    2017-03-01

    The purpose was to investigate which detailed characteristics of shift schedules that are seen as problems to those exposed. A representative national sample of non-day workers (N = 2031) in Sweden was asked whether they had each of a number of particular work schedule characteristics and, if yes, to what extent this constituted a "big problem in life". It was also inquired whether the individual's work schedules had negative consequences for fatigue, sleep and social life. The characteristic with the highest percentage reporting a big problem was "short notice (<1 month) of a new work schedule" (30.5%), <11 h off between shifts (27.8%), and split duty (>1.5 h break at mid-shift, 27.2%). Overtime (>10 h/week), night work, morning work, day/night shifts showed lower prevalences of being a "big problem". Women indicated more problems in general. Short notice was mainly related to negative social effects, while <11 h off between shifts was related to disturbed sleep, fatigue and social difficulties. It was concluded that schedules involving unpredictable working hours (short notice), short daily rest between shifts, and split duty shifts constitute big problems. The results challenge current views of what aspects of shift work need improvement, and negative social consequences seem more important than those related to health. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Service-Oriented Node Scheduling Scheme for Wireless Sensor Networks Using Markov Random Field Model

    PubMed Central

    Cheng, Hongju; Su, Zhihuang; Lloret, Jaime; Chen, Guolong

    2014-01-01

    Future wireless sensor networks are expected to provide various sensing services and energy efficiency is one of the most important criterions. The node scheduling strategy aims to increase network lifetime by selecting a set of sensor nodes to provide the required sensing services in a periodic manner. In this paper, we are concerned with the service-oriented node scheduling problem to provide multiple sensing services while maximizing the network lifetime. We firstly introduce how to model the data correlation for different services by using Markov Random Field (MRF) model. Secondly, we formulate the service-oriented node scheduling issue into three different problems, namely, the multi-service data denoising problem which aims at minimizing the noise level of sensed data, the representative node selection problem concerning with selecting a number of active nodes while determining the services they provide, and the multi-service node scheduling problem which aims at maximizing the network lifetime. Thirdly, we propose a Multi-service Data Denoising (MDD) algorithm, a novel multi-service Representative node Selection and service Determination (RSD) algorithm, and a novel MRF-based Multi-service Node Scheduling (MMNS) scheme to solve the above three problems respectively. Finally, extensive experiments demonstrate that the proposed scheme efficiently extends the network lifetime. PMID:25384005

  14. A bicriteria heuristic for an elective surgery scheduling problem.

    PubMed

    Marques, Inês; Captivo, M Eugénia; Vaz Pato, Margarida

    2015-09-01

    Resource rationalization and reduction of waiting lists for surgery are two main guidelines for hospital units outlined in the Portuguese National Health Plan. This work is dedicated to an elective surgery scheduling problem arising in a Lisbon public hospital. In order to increase the surgical suite's efficiency and to reduce the waiting lists for surgery, two objectives are considered: maximize surgical suite occupation and maximize the number of surgeries scheduled. This elective surgery scheduling problem consists of assigning an intervention date, an operating room and a starting time for elective surgeries selected from the hospital waiting list. Accordingly, a bicriteria surgery scheduling problem arising in the hospital under study is presented. To search for efficient solutions of the bicriteria optimization problem, the minimization of a weighted Chebyshev distance to a reference point is used. A constructive and improvement heuristic procedure specially designed to address the objectives of the problem is developed and results of computational experiments obtained with empirical data from the hospital are presented. This study shows that by using the bicriteria approach presented here it is possible to build surgical plans with very good performance levels. This method can be used within an interactive approach with the decision maker. It can also be easily adapted to other hospitals with similar scheduling conditions.

  15. Performance evaluation of different types of particle representation procedures of Particle Swarm Optimization in Job-shop Scheduling Problems

    NASA Astrophysics Data System (ADS)

    Izah Anuar, Nurul; Saptari, Adi

    2016-02-01

    This paper addresses the types of particle representation (encoding) procedures in a population-based stochastic optimization technique in solving scheduling problems known in the job-shop manufacturing environment. It intends to evaluate and compare the performance of different particle representation procedures in Particle Swarm Optimization (PSO) in the case of solving Job-shop Scheduling Problems (JSP). Particle representation procedures refer to the mapping between the particle position in PSO and the scheduling solution in JSP. It is an important step to be carried out so that each particle in PSO can represent a schedule in JSP. Three procedures such as Operation and Particle Position Sequence (OPPS), random keys representation and random-key encoding scheme are used in this study. These procedures have been tested on FT06 and FT10 benchmark problems available in the OR-Library, where the objective function is to minimize the makespan by the use of MATLAB software. Based on the experimental results, it is discovered that OPPS gives the best performance in solving both benchmark problems. The contribution of this paper is the fact that it demonstrates to the practitioners involved in complex scheduling problems that different particle representation procedures can have significant effects on the performance of PSO in solving JSP.

  16. Automatic Generation of Heuristics for Scheduling

    NASA Technical Reports Server (NTRS)

    Morris, Robert A.; Bresina, John L.; Rodgers, Stuart M.

    1997-01-01

    This paper presents a technique, called GenH, that automatically generates search heuristics for scheduling problems. The impetus for developing this technique is the growing consensus that heuristics encode advice that is, at best, useful in solving most, or typical, problem instances, and, at worst, useful in solving only a narrowly defined set of instances. In either case, heuristic problem solvers, to be broadly applicable, should have a means of automatically adjusting to the idiosyncrasies of each problem instance. GenH generates a search heuristic for a given problem instance by hill-climbing in the space of possible multi-attribute heuristics, where the evaluation of a candidate heuristic is based on the quality of the solution found under its guidance. We present empirical results obtained by applying GenH to the real world problem of telescope observation scheduling. These results demonstrate that GenH is a simple and effective way of improving the performance of an heuristic scheduler.

  17. Parts and Components Reliability Assessment: A Cost Effective Approach

    NASA Technical Reports Server (NTRS)

    Lee, Lydia

    2009-01-01

    System reliability assessment is a methodology which incorporates reliability analyses performed at parts and components level such as Reliability Prediction, Failure Modes and Effects Analysis (FMEA) and Fault Tree Analysis (FTA) to assess risks, perform design tradeoffs, and therefore, to ensure effective productivity and/or mission success. The system reliability is used to optimize the product design to accommodate today?s mandated budget, manpower, and schedule constraints. Stand ard based reliability assessment is an effective approach consisting of reliability predictions together with other reliability analyses for electronic, electrical, and electro-mechanical (EEE) complex parts and components of large systems based on failure rate estimates published by the United States (U.S.) military or commercial standards and handbooks. Many of these standards are globally accepted and recognized. The reliability assessment is especially useful during the initial stages when the system design is still in the development and hard failure data is not yet available or manufacturers are not contractually obliged by their customers to publish the reliability estimates/predictions for their parts and components. This paper presents a methodology to assess system reliability using parts and components reliability estimates to ensure effective productivity and/or mission success in an efficient manner, low cost, and tight schedule.

  18. Optimizing an F-16 Squadron Weekly Pilot Schedule for the Turkish Air Force

    DTIC Science & Technology

    2010-03-01

    disrupted schedules are rescheduled , minimizing the total number of changes with respect to the previous schedule’s objective function. Output...producing rosters for a nursing staff in a large general hospital (Dowsland, 1998) and afterwards Aickelin and Dowsland use an Indirect Genetic...algorithm to improve the solutions of the nurse scheduling problem which is similar to the fighter squadron pilot scheduling problem (Aickelin and

  19. Scheduling language and algorithm development study. Volume 1, phase 2: Design considerations for a scheduling and resource allocation system

    NASA Technical Reports Server (NTRS)

    Morrell, R. A.; Odoherty, R. J.; Ramsey, H. R.; Reynolds, C. C.; Willoughby, J. K.; Working, R. D.

    1975-01-01

    Data and analyses related to a variety of algorithms for solving typical large-scale scheduling and resource allocation problems are presented. The capabilities and deficiencies of various alternative problem solving strategies are discussed from the viewpoint of computer system design.

  20. A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan

    NASA Astrophysics Data System (ADS)

    Bhongade, A. S.; Khodke, P. M.

    2014-04-01

    Manufacturing systems, in which, several parts are processed through machining workstations and later assembled to form final products, is common. Though scheduling of such problems are solved using heuristics, available solution approaches can provide solution for only moderate sized problems due to large computation time required. In this work, scheduling approach is developed for such flow-shop manufacturing system having machining workstations followed by assembly workstations. The initial schedule is generated using Disjunctive method and genetic algorithm (GA) is applied further for generating schedule for large sized problems. GA is found to give near optimal solution based on the deviation of makespan from lower bound. The lower bound of makespan of such problem is estimated and percent deviation of makespan from lower bounds is used as a performance measure to evaluate the schedules. Computational experiments are conducted on problems developed using fractional factorial orthogonal array, varying the number of parts per product, number of products, and number of workstations (ranging upto 1,520 number of operations). A statistical analysis indicated the significance of all the three factors considered. It is concluded that GA method can obtain optimal makespan.

  1. Permutation flow-shop scheduling problem to optimize a quadratic objective function

    NASA Astrophysics Data System (ADS)

    Ren, Tao; Zhao, Peng; Zhang, Da; Liu, Bingqian; Yuan, Huawei; Bai, Danyu

    2017-09-01

    A flow-shop scheduling model enables appropriate sequencing for each job and for processing on a set of machines in compliance with identical processing orders. The objective is to achieve a feasible schedule for optimizing a given criterion. Permutation is a special setting of the model in which the processing order of the jobs on the machines is identical for each subsequent step of processing. This article addresses the permutation flow-shop scheduling problem to minimize the criterion of total weighted quadratic completion time. With a probability hypothesis, the asymptotic optimality of the weighted shortest processing time schedule under a consistency condition (WSPT-CC) is proven for sufficiently large-scale problems. However, the worst case performance ratio of the WSPT-CC schedule is the square of the number of machines in certain situations. A discrete differential evolution algorithm, where a new crossover method with multiple-point insertion is used to improve the final outcome, is presented to obtain high-quality solutions for moderate-scale problems. A sequence-independent lower bound is designed for pruning in a branch-and-bound algorithm for small-scale problems. A set of random experiments demonstrates the performance of the lower bound and the effectiveness of the proposed algorithms.

  2. Hybrid Pareto artificial bee colony algorithm for multi-objective single machine group scheduling problem with sequence-dependent setup times and learning effects.

    PubMed

    Yue, Lei; Guan, Zailin; Saif, Ullah; Zhang, Fei; Wang, Hao

    2016-01-01

    Group scheduling is significant for efficient and cost effective production system. However, there exist setup times between the groups, which require to decrease it by sequencing groups in an efficient way. Current research is focused on a sequence dependent group scheduling problem with an aim to minimize the makespan in addition to minimize the total weighted tardiness simultaneously. In most of the production scheduling problems, the processing time of jobs is assumed as fixed. However, the actual processing time of jobs may be reduced due to "learning effect". The integration of sequence dependent group scheduling problem with learning effects has been rarely considered in literature. Therefore, current research considers a single machine group scheduling problem with sequence dependent setup times and learning effects simultaneously. A novel hybrid Pareto artificial bee colony algorithm (HPABC) with some steps of genetic algorithm is proposed for current problem to get Pareto solutions. Furthermore, five different sizes of test problems (small, small medium, medium, large medium, large) are tested using proposed HPABC. Taguchi method is used to tune the effective parameters of the proposed HPABC for each problem category. The performance of HPABC is compared with three famous multi objective optimization algorithms, improved strength Pareto evolutionary algorithm (SPEA2), non-dominated sorting genetic algorithm II (NSGAII) and particle swarm optimization algorithm (PSO). Results indicate that HPABC outperforms SPEA2, NSGAII and PSO and gives better Pareto optimal solutions in terms of diversity and quality for almost all the instances of the different sizes of problems.

  3. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  4. Scientists, Engineers and the Society of Free Choice: Enrollment as Policy and Practice in Swedish Science and Technology Education 1960-1990

    ERIC Educational Resources Information Center

    Lövheim, Daniel

    2014-01-01

    This article portrays the formation of a new problem area within Swedish educational policy in the 1960s, namely the need of scientific manpower and the demands to entice more individuals into studies in science and technology. As a consequence school science was given the mission to be interesting, fun and to change young people's attitudes…

  5. Military Utilization of a Sample of Graduate Scientists and Engineers 1968-1971. Research Memorandum 74-1.

    ERIC Educational Resources Information Center

    Vetter, Betty M.

    This publication is an informal report on a technical research problem, that of manpower utilization. This report is based on the results of a questionnaire sent out in 1973 and completed and returned by 621 men. The sample was the result of a steady attrition of the 3,000 men who responded to a short news item in "Science" magazine inviting…

  6. National Incomes Policy and Manpower Problems. Proceedings of the Annual Research Conference in Industrial Relations (14th, Los Angeles, California, March 16, 1971).

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Inst. of Industrial Relations.

    Two current economic dilemmas concern how to increase the supply of money without risking further inflation and how to influence wage-price decisions. The major purposes of the conference presented in this document were to define a national incomes policy, to explore alternative approaches to wage-price decisions, and to assess their implications…

  7. Russian Vodka - A National Tragedy

    DTIC Science & Technology

    2009-03-01

    Most of these were alcoholic, with the exception of voda and syta. However, besides voda, all had a non- alcoholic version or could be easily fermented ...USSR,” 492. 175 Treml, “Death from Alcohol Poisoning in the USSR,” 493. 176 Ibid., 494. 177 Ibid.., 495. 41 tooth powder, vinegar , and shoe...consumed aircraft gun coolant, vehicle antifreeze, and vinegar concentrate. 234 Today, Russia’s military is overwhelmed by manpower and morale problems

  8. Translations on Eastern Europe Political, Sociological, and Military Affairs No. 1384.

    DTIC Science & Technology

    1977-05-03

    developments; information on general sociological problems and developments in such areas as demography , manpower, public health and welfare, education...as pioneers on the historically new path of socialism/communism, that these peoples have made the greatest sacrifices for proletarian solida- rity...74 average longevity reached 71.3 years. A declining morbidity trend exists for a number of contagious deseases. In the Sixth Five-Year Plan their

  9. Organizati" and Programs of the U.S. Department of Labor: Manpower Administration.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    This publication was prepared to assist agencies in the development of manpower programs under the Demonstration Cities and Metropolitan Development Act of 1966. It contains information concerning the: (1)Manpowe r Administration (MA), (2)Bureau of Employment Security (BES), (3)Bureau of Apprenticeship and Training (BAT), (4)Bureau of Work…

  10. Towards a National Mental Retardation Manpower Model for Canada.

    ERIC Educational Resources Information Center

    Linton, Thomas E.

    The stated need for developing a national mental retardation manpower model for Canada is not the manpower shortages in mental retardation, but the unsound conceptual and functional approaches to the socialization and education of the mentally retarded. The report is divided into the four major areas investigated by a task force. First, the…

  11. A Report on Physician Manpower and Medical Education.

    ERIC Educational Resources Information Center

    American Medical Association, Chicago, IL.

    This report on physician manpower and medical education was prepared jointly by the Council on Medical Education and the Council on Health Manpower, and was adopted by the AMA House of Delegates. It discusses: (1) the AMA's concern for, but noninvolvement in the number of students admitted to medical schools; (2) general considerations of manpower…

  12. Indian Manpower Resources in the Southwest: A Pilot Study.

    ERIC Educational Resources Information Center

    Taylor, Benjamin J.; O'Connor, Dennis J.

    The Indian Manpower Resource Study (IMRS) was undertaken to provide basic information essential to the planning and development of effective programs to make use of the manpower resource of reservation Indians in Arizona and New Mexico. In the past, decision making has largely been undertaken with a minimum of valid information. The reservations…

  13. Graduate Student Support and Manpower Resources in Graduate Science Education, Fall 1970.

    ERIC Educational Resources Information Center

    National Science Foundation, Washington, DC.

    Current data on graduate student support and manpower resources in graduate science education are important to science administrators, educators, and others concerned with the education of highly qualified scientists and engineers and other related manpower issues. They are also of interest to prospective graduate students, vocational counselors,…

  14. A Plan of Action for Selected Health Manpower; A Supplementary Manpower Report to Alabama Comprehensive Health Planning.

    ERIC Educational Resources Information Center

    Alabama State Dept. of Public Health, Montgomery. Comprehensive Health Planning Administration.

    Fourteen categories of manpower, comprising 75 percent of the total health work force requiring formal training of six months or more in Alabama, are studied in this preliminary report. They are physicians, dentists, optometrists, pharmacists, medical technologists, certified laboratory assistants, sanitarians, medical records clerks, radiologic…

  15. Coaching in a Manpower Project. Based on the Experiences of the JOBS NOW Project (September 1966-January 1970).

    ERIC Educational Resources Information Center

    Rogers, David J.; Silverstein, Charles

    This description of "coaching" in a 4-year federally funded special manpower demonstration project, JOBS NOW, is intended especially for program administrators, industrial personnel, and guidance counselors. The project was designed to train and employ previously unemployable, disadvantaged, young black adults, provide manpower systems…

  16. Comparative Costs of Manpower Education: A Methodological Study.

    ERIC Educational Resources Information Center

    Lyman, Jay Rich

    The objective of this study was to establish a criteria and model for comparative evaluation of manpower educational programs. The criteria developed deals with resource allocation in manpower education programs and how well those programs meet the needs of industry. In the proposed model, an occupation is reduced to its basic skills, which are…

  17. Manpower Planning Criteria Manual, Construction Grants Section.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This document presents the material developed in conjunction with a project directed to test a methodology that a state water pollution control agency can use in determining its manpower and training needs. Included is a compilation of the manpower planning criteria used to relate numbers and types of personnel with deferred workloads. It also…

  18. Opportunities in Manpower Training Programs for the Forest Service and Its Cooperators.

    ERIC Educational Resources Information Center

    Forest Service (USDA), Washington, DC.

    Manpower programs in which the U.S. Forest Service can participate are identified in this booklet, and methods and procedures for initiating programs in the interest of meeting the needs of rural areas are explained. Major divisions of the document are Overall Planning, Program Sponsorship, The Program-Operation Mainstream, Manpower Development…

  19. Annual Rural Manpower Report, 1975. State of Maine.

    ERIC Educational Resources Information Center

    Maine State Dept. of Manpower Affairs, Augusta.

    The Annual Rural Manpower Report is a summary of events and programs affecting rural communities during 1975. Intended as a general overview of activities in rural Maine, it is not an indepth study of all manpower programs serving the state. Part I provides the annual summary and discusses planning, economic development, employment and…

  20. Defense.gov - Special Report: Hispanic American Heritage Month - 2013

    Science.gov Websites

    as the assistant secretary of the Navy (Manpower and Reserve Affairs) on Sept. 16, 2009. In this manpower requirements determination. Cruz has been leading all phases of program management in implementing helped to get the AWPS system certified to Congress as being operational for determining manpower

  1. The Area Resource File: ARF. A Manpower Planning and Research Tool.

    ERIC Educational Resources Information Center

    Applied Management Sciences, Inc., Silver Spring, MD.

    This publication describes the Area Resource File (ARF), a computer-based, county-specific health information system with broad analytical capabilities which utilizes manpower and manpower-related data that are available on a compatible basis for all counties in the United States, and which was developed to summarize statistics from many disparate…

  2. HEALTH MANPOWER RESEARCH. VOLUME 1.

    ERIC Educational Resources Information Center

    BUTTER, IRENE; AND OTHERS

    THE TWO PARTS OF THE DOCUMENT REFLECT THE ACTIVITIES CARRIED OUT TO FULFILL THE PRIMARY PURPOSES OF A PUBLIC HEALTH SERVICE CONTRACT (1) TO STIMULATE FURTHER ACADEMICALLY BASED HEALTH MANPOWER RESEARCH, AND (2) TO EXAMINE THE FIELD IN ORDER TO RECOMMEND PRIORITY AREAS OF HEALTH MANPOWER RESEARCH. PART A INCLUDES--(1) REFERENCE TO A SURVEY PAPER…

  3. 77 FR 34941 - Privacy Act of 1974; Notice of a Computer Matching Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...; Notice of a Computer Matching Program AGENCY: Defense Manpower Data Center, DoD. ACTION: Notice of a... computer matching program are the Department of Veterans Affairs (VA) and the Defense Manpower Data Center... identified as DMDC 01, entitled ``Defense Manpower Data Center Data Base,'' last published in the Federal...

  4. Manpower Development and Training in Correctional Programs. MDTA Experimental and Demonstration Findings No. 3.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    Four conferences on manpower development and training in correctional institutions were sponsored by the Manpower Administration to bring together the basic groups of people charged with responsibility in prisoner rehabilitation and to disseminate to them the significant results of experimental, demonstration, and research projects engaged in…

  5. 78 FR 78838 - National Medal of Technology and Innovation Call for 2014 Nominations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... development of technological manpower, you may obtain a nomination form from: http://www.uspto.gov/about/nmti... to the development of technological manpower, for the improvement of the economic, environmental or...'s technological manpower has had a profound and significant impact on our economy and way of life...

  6. FIRST ANNUAL REPORT, 7-1-66 TO 5-31-67.

    ERIC Educational Resources Information Center

    JAKUBAUSKAS, EDWARD B.

    SUPPORTED BY A MANPOWER INSTITUTIONAL GRANT, THE CENTER'S PURPOSES WERE TO (1) CONDUCT BASIC MANPOWER RESEARCH OF REGIONAL AND NATIONAL SIGNIFICANCE, (2) DEVELOP A SUPPLY OF SCHOLARS IN MANPOWER, (3) UPDATE SKILLS OF SCHOLARS AND PRACTITIONERS THROUGH WORKSHOPS AND INSTITUTES, AND (4) DEVELOP AND MAINTAIN A CLEARINGHOUSE OF RESEARCH AND TO…

  7. 77 FR 35432 - Privacy Act of 1974, Computer Matching Program: United States Postal Service and the Defense...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... the Defense Manpower Data Center, Department of Defense AGENCY: Postal Service TM . ACTION: Notice of Computer Matching Program--United States Postal Service and the Defense Manpower Data Center, Department of... as the recipient agency in a computer matching program with the Defense Manpower Data Center (DMDC...

  8. The National Manpower Survey of the Criminal Justice System. Volume Four: Courts.

    ERIC Educational Resources Information Center

    National Planning Association, Washington, DC.

    Focusing on adjudication manpower (judges, prosecutors, public defenders, court administrators, and probation officers), this document is one in a series of six volumes reporting the results of the National Manpower Survey (NMS) of the Criminal Justice System. Chapter 1 of six chapters summarizes the major results and recommendations of an…

  9. Manpower Aspects of Recent Economic Developments in Europe.

    ERIC Educational Resources Information Center

    International Labour Office, Geneva (Switzerland).

    This book examined economic growth and manpower policy and developments in Europe. Chapter I presents statistical data on labor force growth, trends in unemployment, occupational structure, and technological change for 1950-65 and made projections for 1965-80. The second chapter is an analysis of the relationship of manpower policy to general…

  10. Federal Manpower Legislation and the Academic Health Centers: An Interim Report.

    ERIC Educational Resources Information Center

    Carter, Grace M.; And Others

    Health Manpower Legislation and related research aspects are the topics of this report. The program of the Comprehensive Health Manpower Training Act of 1971 played a major role in the medical school enrollment expansion that occurred between 1971 and 1973. Medical school admissions decisions have been responsible to federal policy objectives and…

  11. Diagnosis: Acute. Report of Health Manpower Committee.

    ERIC Educational Resources Information Center

    Health and Hospital Council, Charlotte, NC.

    The number of health workers in Charlotte is inadequate. A local survey reported approximately 10 0/0 of total positions to be vacant. In an effort to help meet the critical manpower needs of the area, the Health Manpower Committee made these recommendations: existing local programs for registered nurses should continue to work toward increasing…

  12. 1973 Maryland Rural Manpower Report. Report No. MA 5-79.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Employment and Social Services, Baltimore. Employment Security Administration.

    Prepared by the State Department of Employment and Social Services (Research and Analysis Division) and the Rural Manpower Staff, this 1973 annual report provides a summary and review of the activities of Maryland's Rural Manpower Services Program. The report briefly gives: (1) a statement on the program's administrative organization and…

  13. A Navy Shore Activity Manpower Planning System for Civilians. Technical Report No. 24.

    ERIC Educational Resources Information Center

    Niehaus, R. J.; Sholtz, D.

    This report describes the U.S. Navy Shore Activity Manpower Planning System (SAMPS) advanced development research project. This effort is aimed at large-scale feasibility tests of manpower models for large Naval installations. These local planning systems are integrated with Navy-wide information systems on a data-communications network accessible…

  14. A fast and precise indoor localization algorithm based on an online sequential extreme learning machine.

    PubMed

    Zou, Han; Lu, Xiaoxuan; Jiang, Hao; Xie, Lihua

    2015-01-15

    Nowadays, developing indoor positioning systems (IPSs) has become an attractive research topic due to the increasing demands on location-based service (LBS) in indoor environments. WiFi technology has been studied and explored to provide indoor positioning service for years in view of the wide deployment and availability of existing WiFi infrastructures in indoor environments. A large body of WiFi-based IPSs adopt fingerprinting approaches for localization. However, these IPSs suffer from two major problems: the intensive costs of manpower and time for offline site survey and the inflexibility to environmental dynamics. In this paper, we propose an indoor localization algorithm based on an online sequential extreme learning machine (OS-ELM) to address the above problems accordingly. The fast learning speed of OS-ELM can reduce the time and manpower costs for the offline site survey. Meanwhile, its online sequential learning ability enables the proposed localization algorithm to adapt in a timely manner to environmental dynamics. Experiments under specific environmental changes, such as variations of occupancy distribution and events of opening or closing of doors, are conducted to evaluate the performance of OS-ELM. The simulation and experimental results show that the proposed localization algorithm can provide higher localization accuracy than traditional approaches, due to its fast adaptation to various environmental dynamics.

  15. Decomposition of timed automata for solving scheduling problems

    NASA Astrophysics Data System (ADS)

    Nishi, Tatsushi; Wakatake, Masato

    2014-03-01

    A decomposition algorithm for scheduling problems based on timed automata (TA) model is proposed. The problem is represented as an optimal state transition problem for TA. The model comprises of the parallel composition of submodels such as jobs and resources. The procedure of the proposed methodology can be divided into two steps. The first step is to decompose the TA model into several submodels by using decomposable condition. The second step is to combine individual solution of subproblems for the decomposed submodels by the penalty function method. A feasible solution for the entire model is derived through the iterated computation of solving the subproblem for each submodel. The proposed methodology is applied to solve flowshop and jobshop scheduling problems. Computational experiments demonstrate the effectiveness of the proposed algorithm compared with a conventional TA scheduling algorithm without decomposition.

  16. A controlled genetic algorithm by fuzzy logic and belief functions for job-shop scheduling.

    PubMed

    Hajri, S; Liouane, N; Hammadi, S; Borne, P

    2000-01-01

    Most scheduling problems are highly complex combinatorial problems. However, stochastic methods such as genetic algorithm yield good solutions. In this paper, we present a controlled genetic algorithm (CGA) based on fuzzy logic and belief functions to solve job-shop scheduling problems. For better performance, we propose an efficient representational scheme, heuristic rules for creating the initial population, and a new methodology for mixing and computing genetic operator probabilities.

  17. Scheduling in the Face of Uncertain Resource Consumption and Utility

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Dearden, Richard

    2003-01-01

    We discuss the problem of scheduling tasks that consume uncertain amounts of a resource with known capacity and where the tasks have uncertain utility. In these circumstances, we would like to find schedules that exceed a lower bound on the expected utility when executed. We show that the problems are NP- complete, and present some results that characterize the behavior of some simple heuristics over a variety of problem classes.

  18. Scheduling Earth Observing Fleets Using Evolutionary Algorithms: Problem Description and Approach

    NASA Technical Reports Server (NTRS)

    Globus, Al; Crawford, James; Lohn, Jason; Morris, Robert; Clancy, Daniel (Technical Monitor)

    2002-01-01

    We describe work in progress concerning multi-instrument, multi-satellite scheduling. Most, although not all, Earth observing instruments currently in orbit are unique. In the relatively near future, however, we expect to see fleets of Earth observing spacecraft, many carrying nearly identical instruments. This presents a substantially new scheduling challenge. Inspired by successful commercial applications of evolutionary algorithms in scheduling domains, this paper presents work in progress regarding the use of evolutionary algorithms to solve a set of Earth observing related model problems. Both the model problems and the software are described. Since the larger problems will require substantial computation and evolutionary algorithms are embarrassingly parallel, we discuss our parallelization techniques using dedicated and cycle-scavenged workstations.

  19. Modelling of project cash flow on construction projects in Malang city

    NASA Astrophysics Data System (ADS)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  20. Contingency rescheduling of spacecraft operations

    NASA Technical Reports Server (NTRS)

    Britt, Daniel L.; Geoffroy, Amy L.; Gohring, John R.

    1988-01-01

    Spacecraft activity scheduling was a focus of attention in artificial intelligence recently. Several scheduling systems were devised which more-or-less successfully address various aspects of the activity scheduling problem, though most of these are not yet mature, with the notable expection of NASA's ESP. Few current scheduling systems, however, make any attempt to deal fully with the problem of modifying a schedule in near-real-time in the event of contingencies which may arise during schedule execution. These contingencies can include resources becoming unavailable unpredictably, a change in spacecraft conditions or environment, or the need to perform an activity not scheduled. In these cases it becomes necessary to repair an existing schedule, disrupting ongoing operations as little as possible. Normal scheduling is just a part of that which must be accomplished during contingency rescheduling. A prototype system named MAESTRO was developed for spacecraft activity scheduling. MAESTRO is briefly described with a focus on recent work in the area of real-time contingency handling. Included is a discussion of some of the complexities of the scheduling problem and how they affect contingency rescheduling, such as temporal constraints between activities, activities which may be interrupted and continued in any of several ways, and different ways to choose a resource complement which will allow continuation of an activity. Various heuristics used in MAESTRO for contingency rescheduling is discussed, as are operational concerns such as interaction of the scheduler with spacecraft subsystems controllers.

  1. Using Multiple Schedules During Functional Communication Training to Promote Rapid Transfer of Treatment Effects

    PubMed Central

    Fisher, Wayne W.; Greer, Brian D.; Fuhrman, Ashley M.; Querim, Angie C.

    2016-01-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects from one setting to the next and from one therapist to the next. With two children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. PMID:26384141

  2. A Simulation Based Approach to Optimize Berth Throughput Under Uncertainty at Marine Container Terminals

    NASA Technical Reports Server (NTRS)

    Golias, Mihalis M.

    2011-01-01

    Berth scheduling is a critical function at marine container terminals and determining the best berth schedule depends on several factors including the type and function of the port, size of the port, location, nearby competition, and type of contractual agreement between the terminal and the carriers. In this paper we formulate the berth scheduling problem as a bi-objective mixed-integer problem with the objective to maximize customer satisfaction and reliability of the berth schedule under the assumption that vessel handling times are stochastic parameters following a discrete and known probability distribution. A combination of an exact algorithm, a Genetic Algorithms based heuristic and a simulation post-Pareto analysis is proposed as the solution approach to the resulting problem. Based on a number of experiments it is concluded that the proposed berth scheduling policy outperforms the berth scheduling policy where reliability is not considered.

  3. Using multiple schedules during functional communication training to promote rapid transfer of treatment effects.

    PubMed

    Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C

    2015-12-01

    Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.

  4. Capability of the Maximax&Maximin selection operator in the evolutionary algorithm for a nurse scheduling problem

    NASA Astrophysics Data System (ADS)

    Ramli, Razamin; Tein, Lim Huai

    2016-08-01

    A good work schedule can improve hospital operations by providing better coverage with appropriate staffing levels in managing nurse personnel. Hence, constructing the best nurse work schedule is the appropriate effort. In doing so, an improved selection operator in the Evolutionary Algorithm (EA) strategy for a nurse scheduling problem (NSP) is proposed. The smart and efficient scheduling procedures were considered. Computation of the performance of each potential solution or schedule was done through fitness evaluation. The best so far solution was obtained via special Maximax&Maximin (MM) parent selection operator embedded in the EA, which fulfilled all constraints considered in the NSP.

  5. Scheduling multirobot operations in manufacturing by truncated Petri nets

    NASA Astrophysics Data System (ADS)

    Chen, Qin; Luh, J. Y.

    1995-08-01

    Scheduling of operational sequences in manufacturing processes is one of the important problems in automation. Methods of applying Petri nets to model and analyze the problem with constraints on precedence relations, multiple resources allocation, etc. have been available in literature. Searching for an optimum schedule can be implemented by combining the branch-and-bound technique with the execution of the timed Petri net. The process usually produces a large Petri net which is practically not manageable. This disadvantage, however, can be handled by a truncation technique which divides the original large Petri net into several smaller size subnets. The complexity involved in the analysis of each subnet individually is greatly reduced. However, when the locally optimum schedules of the resulting subnets are combined together, it may not yield an overall optimum schedule for the original Petri net. To circumvent this problem, algorithms are developed based on the concepts of Petri net execution and modified branch-and-bound process. The developed technique is applied to a multi-robot task scheduling problem of the manufacturing work cell.

  6. Tools for Coordinated Planning Between Observatories

    NASA Technical Reports Server (NTRS)

    Jones, Jeremy; Fishman, Mark; Grella, Vince; Kerbel, Uri; Maks, Lori; Misra, Dharitri; Pell, Vince; Powers, Edward I. (Technical Monitor)

    2001-01-01

    With the realization of NASA's era of great observatories, there are now more than three space-based telescopes operating in different wavebands. This situation provides astronomers with a unique opportunity to simultaneously observe with multiple observatories. Yet scheduling multiple observatories simultaneously is highly inefficient when compared to observations using only one single observatory. Thus, programs using multiple observatories are limited not due to scientific restrictions, but due to operational inefficiencies. At present, multi-observatory programs are conducted by submitting observing proposals separately to each concerned observatory. To assure that the proposed observations can be scheduled, each observatory's staff has to check that the observations are valid and meet all the constraints for their own observatory; in addition, they have to verify that the observations satisfy the constraints of the other observatories. Thus, coordinated observations require painstaking manual collaboration among the observatory staff at each observatory. Due to the lack of automated tools for coordinated observations, this process is time consuming, error-prone, and the outcome of the requests is not certain until the very end. To increase observatory operations efficiency, such manpower intensive processes need to undergo re-engineering. To overcome this critical deficiency, Goddard Space Flight Center's Advanced Architectures and Automation Branch is developing a prototype effort called the Visual Observation Layout Tool (VOLT). The main objective of the VOLT project is to provide visual tools to help automate the planning of coordinated observations by multiple astronomical observatories, as well as to increase the scheduling probability of all observations.

  7. Tomorrow's Manpower Needs. Volume III, National Trends and Outlook: Occupational Employment. Bulletin No. 1606.

    ERIC Educational Resources Information Center

    Bureau of Labor Statistics (DOL), Washington, DC.

    This publication is the third of four volumes of "Tomorrow's Manpower Needs," which are devoted to the subject of national, state, and area projections of manpower requirements. This volume presents information on the national employment trends and projected 1975 requirements for workers in nine major occupational groups and 40 selected…

  8. 75 FR 45158 - RBS Citizens, N.A., Business Services, Including On-Site Leased Workers of Manpower and Randstad...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Citizens, N.A., Business Services, Including On-Site Leased Workers of Manpower and Randstad, 1 Citizens Drive, Riverside, RI RBS Citizens, N.A., Business Services, Including On-Site Leased Workers of Manpower... Worker Adjustment Assistance In accordance with Section 223 of the Trade Act of 1974, as amended (``Act...

  9. Nigerian University and Manpower Development in a Changing World

    ERIC Educational Resources Information Center

    Anyebe, Adam Adem

    2014-01-01

    This paper examines Nigerian university system in relation to manpower development in a rapidly changing world of work. This is for purposes of identifying areas that need urgent attention in order to reposition the system to produce high quality manpower. The study reveals that the expansion in the university system is characterized by a mixed…

  10. THE ROLE OF THE NONPROFESSIONAL IN THE MANPOWER DEVELOPMENT PROGRAMS. SUBMITTED FOR OPERATION RETRIEVAL.

    ERIC Educational Resources Information Center

    GROSSER, CHARLES

    BASED ON A REVIEW OF REPORTS AND OTHER DOCUMENTS PREPARED BY VARIOUS MANPOWER DEVELOPMENT TRAINING ACT-SPONSORED YOUTH-TRAINING PROJECTS AND ON INTERVIEWS WITH ADMINISTRATORS AND COMMUNITY RESIDENTS AT FIVE PROJECT SITES, THIS STUDY EVALUATES THE USE OF NONPROFESSIONAL STAFF IN THE OPERATION OF MANPOWER PROGRAMS. THE CONSEQUENCES OF SUCH…

  11. The National Manpower Survey of the Criminal Justice System. Volume One: Summary Report.

    ERIC Educational Resources Information Center

    American Institutes for Research in the Behavioral Sciences, Washington, DC.

    As mandated in the 1973 Amendments to the Safe Streets Act, the National Manpower Survey of the Criminal Justice System was conducted to assess current and projected manpower needs, personnel quality, and training and education programs. Data were collected from the following sources: surveys of 8,000 executives of state and local criminal justice…

  12. MDTA Experimental and Demonstration Findings No. 3: Manpower Development and Training in Correctional Programs. Final Report.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC.

    The capabilities of Title I of the Manpower Development and Training Act have been used for several years to fund experimental and demonstration projects for the prerelease training of prisoners. Four conferences on Manpower Development and Training in correctional institutions were sponsored to bring together the basic groups of people charged…

  13. Analysis of Some Potential Manpower Policies for the All-Volunteer Navy. Final Report.

    ERIC Educational Resources Information Center

    Battelle, R. Bard; And Others

    This report describes an analysis of Navy personnel as a subsystem of the Navy, functioning with the overall objective of maintaining Fleet readiness within the constraints of budget and manpower supply limitations. Manpower utilization and management techniques and options were examined and evaluated for their usefulness to an all volunteer Navy…

  14. The Supply of and Demand for Graduates of Post-Secondary School Institutions in the Next Decade

    ERIC Educational Resources Information Center

    Goodman, F. V. S.

    1969-01-01

    Joint responsibility of education authorities and the Department of Manpower and Immigration is to accelerate research and to develop programs which will ease the process of adjustment to changing conditions in manpower demand. The inevitable prerequisite of closer matching of demand for and supply of qualified manpower is increased specialization…

  15. 32 CFR Appendix D to Part 169a - Commercial Activities Management Information System (CAMIS)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to provide an initial estimate of the manpower associated with the activity (or activities). The initial estimate of the manpower in this section of the CCR will be in all cases those manpower figures... Medical Program of the Uniformed Services (CHAMPUS) [3D1] E—Defense Advanced Research Projects Agency F...

  16. 32 CFR Appendix D to Part 169a - Commercial Activities Management Information System (CAMIS)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to provide an initial estimate of the manpower associated with the activity (or activities). The initial estimate of the manpower in this section of the CCR will be in all cases those manpower figures... Medical Program of the Uniformed Services (CHAMPUS) [3D1] E—Defense Advanced Research Projects Agency F...

  17. 32 CFR Appendix D to Part 169a - Commercial Activities Management Information System (CAMIS)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to provide an initial estimate of the manpower associated with the activity (or activities). The initial estimate of the manpower in this section of the CCR will be in all cases those manpower figures... Medical Program of the Uniformed Services (CHAMPUS) [3D1] E—Defense Advanced Research Projects Agency F...

  18. 32 CFR Appendix D to Part 169a - Commercial Activities Management Information System (CAMIS)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to provide an initial estimate of the manpower associated with the activity (or activities). The initial estimate of the manpower in this section of the CCR will be in all cases those manpower figures... Medical Program of the Uniformed Services (CHAMPUS) [3D1] E—Defense Advanced Research Projects Agency F...

  19. Handbook of Information Relevant to Manpower Agencies: A Compilation of Practice Principles and Strategies for Manpower Operations.

    ERIC Educational Resources Information Center

    Erfurt, John C.; And Others

    Concepts of internal agency structure and operations, agency-company relations, and agency-enrollee relations, with recommendations for their implementation, form the three main sections of this handbook developed for manpower agency administrators, supervisory staffs and program planners. It is designed to aid those who organize and develop…

  20. The Total Impact of Manpower Programs: A Four-City Case Study. Volume II--Final Report.

    ERIC Educational Resources Information Center

    Olympus Research Corp., Washington, DC.

    Based on followup interviews with 1700 participants, this study is an evaluation of Federal manpower programs in Boston, Denver, and San Francisco-Oakland. Included are Manpower Development and Training Act Programs, Work Incentive Programs, and Concentrated Employment Program from late 1969 to early 1970. Program impact on enrollees, employers,…

  1. The Manpower Research Institutional Grant Program: The First Three Years 1966-1969.

    ERIC Educational Resources Information Center

    Manpower Administration (DOL), Washington, DC. Office of Manpower Research.

    This document, based on 3-year summary reports submitted by the participating schools, summarizes programs supported by the Manpower Research Institutional Grant Program under authority of Title I of the Manpower Development and Training Act of 1962, as amended. In June 1966, the first grants were awarded to seven colleges and universities. The…

  2. The Practice of Manpower Forecasting: A Collection of Case Studies. Studies on Education; Vol. 1.

    ERIC Educational Resources Information Center

    Ahamad, Bashir; And Others

    In the 1960's academics, politicians, administrators and industrialists became convinced of the importance of education for economic development. The forecasting of qualified manpower needs was able to turn this new idea into practice. During the decade hundreds of manpower forecasts were made, and innumerable international conferenceses were held…

  3. Engineering Manpower and Engineering Education in New York State: A Report and Recommendations for Action.

    ERIC Educational Resources Information Center

    Diamond, Celia B.

    Data related to current and recent engineering manpower demand, engineering degrees and enrollments, supply and demand projections for engineering manpower, and results of an April 1982 survey of New York's engineering schools are presented and discussed in separate sections of this report. Based on these data, nine recommendations for the future…

  4. 42 CFR 23.10 - Under what circumstances may a National Health Service Corps site's reimbursement obligation to...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., private organizations and individuals; (iii) The need of the health manpower shortage area for health... personnel. (2) A significant percentage of the individuals who are located in the health manpower shortage... the health manpower shortage area and the area's cost-of-living index. (b) The Secretary may waive in...

  5. Manpower Policies and Programs; A Review, 1935-75.

    ERIC Educational Resources Information Center

    Clague, Ewan; Kramer, Leo

    Constituting an update to a previous publication that interpreted the directions of United States manpower policy subsequent to World War II, this publication places the previous essay in the historical context of manpower policies that reach back to the Great Depression of the 1930's and the Employment Act of 1946; and to policy options now…

  6. AIR NATIONAL GUARD C-130H AIRCRAFT MAINTENANCE OFFICER MANNING: IS THERE A BETTER OPTION

    DTIC Science & Technology

    2016-10-01

    7 Section V: Result of Analysis...was put into how to reorganize existing aircraft manpower and without creating additional cost or manpower requirements. Through careful analysis it...38-201 Determining Manpower Requirements states, “National Guard Bureau (NGB)/A1MR will build Unit Manning Documents (UMD) in accordance with

  7. 42 CFR 23.10 - Under what circumstances may a National Health Service Corps site's reimbursement obligation to...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., private organizations and individuals; (iii) The need of the health manpower shortage area for health... personnel. (2) A significant percentage of the individuals who are located in the health manpower shortage... the health manpower shortage area and the area's cost-of-living index. (b) The Secretary may waive in...

  8. 42 CFR 23.10 - Under what circumstances may a National Health Service Corps site's reimbursement obligation to...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., private organizations and individuals; (iii) The need of the health manpower shortage area for health... personnel. (2) A significant percentage of the individuals who are located in the health manpower shortage... the health manpower shortage area and the area's cost-of-living index. (b) The Secretary may waive in...

  9. 42 CFR 23.10 - Under what circumstances may a National Health Service Corps site's reimbursement obligation to...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., private organizations and individuals; (iii) The need of the health manpower shortage area for health... personnel. (2) A significant percentage of the individuals who are located in the health manpower shortage... the health manpower shortage area and the area's cost-of-living index. (b) The Secretary may waive in...

  10. 42 CFR 23.10 - Under what circumstances may a National Health Service Corps site's reimbursement obligation to...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., private organizations and individuals; (iii) The need of the health manpower shortage area for health... personnel. (2) A significant percentage of the individuals who are located in the health manpower shortage... the health manpower shortage area and the area's cost-of-living index. (b) The Secretary may waive in...

  11. Guidelines for Analysis of Health Manpower Planning. Volume 3: Health Manpower Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Staff, Robert J.; Porter, Dennis R.

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this third of ten manuals in the International Health Planning Methods Series deals with health manpower planning and assessment. It provides a conceptual and…

  12. State Level Programs to Prepare and Use Mental Health Manpower in a State Mental Health Agency.

    ERIC Educational Resources Information Center

    Southern Regional Education Board, Atlanta, GA.

    To assist mental health agency leaders and others concerned with state mental health manpower development, these guidelines (presented in ten sections) explore various issues and approaches and indications for using one approach over another. The first three sections focus on designing and conducting manpower studies, making long range projections…

  13. MANPOWER PROJECTIONS AND TRAINING NEEDS FORECAST TO 1975 FOR THE TERRE HAUTE AREA.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute.

    USING U.S. CENSUS BUREAU AND INDIANA EMPLOYMENT SECURITY DIVISION DATA, A PREVIOUS STUDY WAS UPDATED TO INCLUDE PROJECTIONS OF MANPOWER AND TRAINING NEEDS FOR THE TERRE HAUTE AREA. GRAPHS SHOW TRENDS FOR EIGHT OCCUPATIONAL GROUPS IN THE UNITED STATES, THE NATION'S URBAN AREAS, INDIANA, AND THE TERRE HAUTE STANDARD METROPOLITAN AREA. MANPOWER NEEDS…

  14. A Study of Legal Manpower Demand and Supply in Pennsylvania.

    ERIC Educational Resources Information Center

    Durkee, Frank M.

    This study was directed toward an examination of the legal manpower system and its response to needs in Pennsylvania. Information based on surveys is presented on: (1) lawyer-population ratios by counties, lawyer-area ratios by counties, and lawyer ratios to population and area in the State; (2) legal manpower demand in terms of correlations…

  15. The use of think-aloud and instant data analysis in evaluation research: Exemplar and lessons learned.

    PubMed

    Joe, Jonathan; Chaudhuri, Shomir; Le, Thai; Thompson, Hilaire; Demiris, George

    2015-08-01

    While health information technologies have become increasingly popular, many have not been formally tested to ascertain their usability. Traditional rigorous methods take significant amounts of time and manpower to evaluate the usability of a system. In this paper, we evaluate the use of instant data analysis (IDA) as developed by Kjeldskov et al. to perform usability testing on a tool designed for older adults and caregivers. The IDA method is attractive because it takes significantly less time and manpower than the traditional usability testing methods. In this paper we demonstrate how IDA was used to evaluate usability of a multifunctional wellness tool, discuss study results and lessons learned while using this method. We also present findings from an extension of the method which allows the grouping of similar usability problems in an efficient manner. We found that the IDA method is a quick, relatively easy approach to identifying and ranking usability issues among health information technologies. Copyright © 2015 Elsevier Inc. All rights reserved.

  16. Automatic photointerpretation for land use management in Minnesota

    NASA Technical Reports Server (NTRS)

    Swanlund, G. D. (Principal Investigator); Pile, D. R.; Zirkle, R. E.

    1973-01-01

    The author has identified the following significant results. Progress is being made in the areas of sun angle and atmospheric effects on the data and its interpretation. The effort is aimed at correction using only navigation and calendar data needed for satellite operation and derivations from the MSS data. Water estimation of value to land planners and conservationists has been demonstrated with verification of performance by comparison with a concurrent study involving map planimetry, aerial photos, and field-checking. The satellite will provide seasonal and annual coverage with timely information in a way not now feasible by conventional methods. For example, the reference data were obtained using the most recent files, which date back to 1949, and from most recent photography taken in 1968. The calendar time involved was three to four months, which is a reflection on priority pressure on trained manpower available. ERTS-1 data can help relieve this problem by providing the needed information while freeing trained manpower for more appropriate parts of the effort.

  17. Scheduling in the Face of Uncertain Resource Consumption and Utility

    NASA Technical Reports Server (NTRS)

    Koga, Dennis (Technical Monitor); Frank, Jeremy; Dearden, Richard

    2003-01-01

    We discuss the problem of scheduling tasks that consume a resource with known capacity and where the tasks have varying utility. We consider problems in which the resource consumption and utility of each activity is described by probability distributions. In these circumstances, we would like to find schedules that exceed a lower bound on the expected utility when executed. We first show that while some of these problems are NP-complete, others are only NP-Hard. We then describe various heuristic search algorithms to solve these problems and their drawbacks. Finally, we present empirical results that characterize the behavior of these heuristics over a variety of problem classes.

  18. A novel discrete PSO algorithm for solving job shop scheduling problem to minimize makespan

    NASA Astrophysics Data System (ADS)

    Rameshkumar, K.; Rajendran, C.

    2018-02-01

    In this work, a discrete version of PSO algorithm is proposed to minimize the makespan of a job-shop. A novel schedule builder has been utilized to generate active schedules. The discrete PSO is tested using well known benchmark problems available in the literature. The solution produced by the proposed algorithms is compared with best known solution published in the literature and also compared with hybrid particle swarm algorithm and variable neighborhood search PSO algorithm. The solution construction methodology adopted in this study is found to be effective in producing good quality solutions for the various benchmark job-shop scheduling problems.

  19. [Dental practitioners in Israel: past, present and future].

    PubMed

    Mann, J; Vered, Y; Zini, A

    2010-04-01

    Since 1980 various studies have been published in Israel dealing with dental manpower issues, utilizing several methods such as manpower to population ratio. The dental literature pointed out that dentistry in Israel has an over supply of dentists and that manpower to population ratio is one of the highest in the world 1:770. All studies were based on the information provided by the Ministry of Health which showed that Israel has over 9500 dentists. The Israel Central Bureau of Statistics figures showed a much smaller number which was 5700 active dentists. This enormous gap in between two sources of information, following strict examination of the data revealed that the Bureau of Statistics information is reliable and hence, the real manpower to population ratio in Israel in 2008 was 1:1271. Prediction of manpower is extremely important and the base line information is crucial for future evaluations.

  20. Evaluation of nursing manpower allocation in a nursing home.

    PubMed

    Chen, Chun-Hsi; Tsai, Wen-Chen; Chang, Wei-Chieh

    2007-03-01

    The subjects of this study encompassed the nursing staffs (nurses and nursing aids) and residents of a public hospital-based nursing home. By intensive sampling, this study explored the differences in actual times that nurses spent caring for residents. We assessed the functional status of nursing home residents of various illness severities as well as measured the actual nursing manpower needed to meet the residents' care needs using Typology of the Aged with Illustration (TAI). Results showed that current nursing manpower levels in nursing homes was adequate, although some units had excessive manpower allocation. As a result, this study suggests the establishment of a resident classification system for use in long-term care (LTC) facilities to assist with manpower allocation and reasonable utilization of resources within the facility. Adequate nurse staffing will enhance the quality and accessibility of care for the residents with severe illnesses in LTC facilities.

  1. Discrete Optimization Model for Vehicle Routing Problem with Scheduling Side Cosntraints

    NASA Astrophysics Data System (ADS)

    Juliandri, Dedy; Mawengkang, Herman; Bu'ulolo, F.

    2018-01-01

    Vehicle Routing Problem (VRP) is an important element of many logistic systems which involve routing and scheduling of vehicles from a depot to a set of customers node. This is a hard combinatorial optimization problem with the objective to find an optimal set of routes used by a fleet of vehicles to serve the demands a set of customers It is required that these vehicles return to the depot after serving customers’ demand. The problem incorporates time windows, fleet and driver scheduling, pick-up and delivery in the planning horizon. The goal is to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the overall costs of all routes over the planning horizon. We model the problem as a linear mixed integer program. We develop a combination of heuristics and exact method for solving the model.

  2. Open shop scheduling problem to minimize total weighted completion time

    NASA Astrophysics Data System (ADS)

    Bai, Danyu; Zhang, Zhihai; Zhang, Qiang; Tang, Mengqian

    2017-01-01

    A given number of jobs in an open shop scheduling environment must each be processed for given amounts of time on each of a given set of machines in an arbitrary sequence. This study aims to achieve a schedule that minimizes total weighted completion time. Owing to the strong NP-hardness of the problem, the weighted shortest processing time block (WSPTB) heuristic is presented to obtain approximate solutions for large-scale problems. Performance analysis proves the asymptotic optimality of the WSPTB heuristic in the sense of probability limits. The largest weight block rule is provided to seek optimal schedules in polynomial time for a special case. A hybrid discrete differential evolution algorithm is designed to obtain high-quality solutions for moderate-scale problems. Simulation experiments demonstrate the effectiveness of the proposed algorithms.

  3. Empirical results on scheduling and dynamic backtracking

    NASA Technical Reports Server (NTRS)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  4. Sensitivity and bias under conditions of equal and unequal academic task difficulty.

    PubMed

    Reed, Derek D; Martens, Brian K

    2008-01-01

    We conducted an experimental analysis of children's relative problem-completion rates across two workstations under conditions of equal (Experiment 1) and unequal (Experiment 2) problem difficulty. Results were described using the generalized matching equation and were evaluated for degree of schedule versus stimulus control. Experiment 1 involved a symmetrical choice arrangement in which the children could earn points exchangeable for rewards contingent on correct math problem completion. Points were delivered according to signaled variable-interval schedules at each workstation. For 2 children, relative rates of problem completion appeared to have been controlled by the schedule requirements in effect and matched relative rates of reinforcement, with sensitivity values near 1 and bias values near 0. Experiment 2 involved increasing the difficulty of math problems at one of the workstations. Sensitivity values for all 3 participants were near 1, but a substantial increase in bias toward the easier math problems was observed. This bias was possibly associated with responding at the more difficult workstation coming under stimulus control rather than schedule control.

  5. Analysis of Feeder Bus Network Design and Scheduling Problems

    PubMed Central

    Almasi, Mohammad Hadi; Karim, Mohamed Rehan

    2014-01-01

    A growing concern for public transit is its inability to shift passenger's mode from private to public transport. In order to overcome this problem, a more developed feeder bus network and matched schedules will play important roles. The present paper aims to review some of the studies performed on Feeder Bus Network Design and Scheduling Problem (FNDSP) based on three distinctive parts of the FNDSP setup, namely, problem description, problem characteristics, and solution approaches. The problems consist of different subproblems including data preparation, feeder bus network design, route generation, and feeder bus scheduling. Subsequently, descriptive analysis and classification of previous works are presented to highlight the main characteristics and solution methods. Finally, some of the issues and trends for future research are identified. This paper is targeted at dealing with the FNDSP to exhibit strategic and tactical goals and also contributes to the unification of the field which might be a useful complement to the few existing reviews. PMID:24526890

  6. A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes.

    PubMed

    Lee, I; Sikora, R; Shaw, M J

    1997-01-01

    Genetic algorithms (GAs) have been used widely for such combinatorial optimization problems as the traveling salesman problem (TSP), the quadratic assignment problem (QAP), and job shop scheduling. In all of these problems there is usually a well defined representation which GA's use to solve the problem. We present a novel approach for solving two related problems-lot sizing and sequencing-concurrently using GAs. The essence of our approach lies in the concept of using a unified representation for the information about both the lot sizes and the sequence and enabling GAs to evolve the chromosome by replacing primitive genes with good building blocks. In addition, a simulated annealing procedure is incorporated to further improve the performance. We evaluate the performance of applying the above approach to flexible flow line scheduling with variable lot sizes for an actual manufacturing facility, comparing it to such alternative approaches as pair wise exchange improvement, tabu search, and simulated annealing procedures. The results show the efficacy of this approach for flexible flow line scheduling.

  7. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm

    NASA Astrophysics Data System (ADS)

    Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu

    2015-12-01

    For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

  8. Army Manpower Cost System (AMCOS) Economic and Budget Cost Models.

    DTIC Science & Technology

    1985-06-30

    STANDARDS - 963 - A ZRDMServices0opaiy in ( o FINAL REPORT Tm ARMY MANPOWER COST SYSTEM4 (ANCOS) ECONOMIC AND BUDGET I COST MODELS CONTRACT NO. N00014...Organization .. .. . . . . . . . . . 1 2.0 AN APPLICATION OF ANCOS: UNIT-LEVEL MANPOWER COST COMPARISON . . . . o ...13 3.0 MODEL OVERVIEW . . . . o . . . . . . .. . .. . o . . 21 3.1 Cost Definitions ........ ............ 22 3.2 Model Output

  9. Balancing Agile Combat Support Manpower to Better Meet the Future Security Environment

    DTIC Science & Technology

    2014-01-01

    for a 3,000-person deployment package. 6 Figure 1.1 Postured Manpower Included in This Analysis NOTE: Spc = space, Avn = aviation, MX...an po w er ,  1 00 0s USAF  postured  manpower Spc,   Avn ,  Mx,  Intel Other  ACS Our  scope 7 • In Chapter Four, we discuss several

  10. Health Manpower Source Book. Manpower Supply and Educational Statistics for Selected Health Occupations: 1968. Public Health Service Publication Number 263, Section 20.

    ERIC Educational Resources Information Center

    National Institutes of Health (DHEW), Bethesda, MD. Bureau of Health Professions Education and Manpower Training.

    This publication is a compilation of statistics on supply and education of health manpower in medicine and osteopathy, dentistry, optometry, pharmacy, podiatry, veterinary medicine, nursing, public health, and eight selected allied health occupations. The material is organized by occupations and the following information is presented for each…

  11. Technical Change and Manpower Planning: Co-Ordination at Enterprise Level. Industrial Relations Aspects of Manpower Policy 4.

    ERIC Educational Resources Information Center

    Barkin, Solomon, Ed.

    The 29 case studies in this report seek to define the policies and practices followed by firms in programing technological change and manpower adjustments. The purpose of the report is to make these policies and practices more broadly known and to extend the range of effective adjustments provided by individual managements. The inquiries were…

  12. Employment Impacts of Health Policy Developments. A Special Report of the National Commission for Manpower Policy. Special Report No. 11.

    ERIC Educational Resources Information Center

    Fein, Rashi; Bishop, Christine

    This eleventh special report of the National Commission for Manpower Policy examines the manpower, employment, and training implications of policy developments in the health care industry. Section 1 describes the health care industry setting, including health sector characteristics and health expenditure growth. Sections 2 and 3 deal with the…

  13. Characteristics of Urban Enrollees Entering the Job Corps. Longitudinal Manpower Evaluation Studies.

    ERIC Educational Resources Information Center

    Office of Economic Opportunity, Washington, DC. Office of Planning, Research, and Evaluation.

    This paper is the first in a series describing the results of the Longitudinal Manpower Study, a national study of four major manpower programs as they operate in large urban areas. Included in the paper are data gained from the responses of 1,236 Job Corps enrollees concerning their reasons for joining the program, their demographic…

  14. An Appraisal of the Manpower Training Programs Established by Congress in the 1960's. Project Baseline Supplemental Report.

    ERIC Educational Resources Information Center

    Brandon, George L.

    Offering an overview and informal appraisal of the Manpower Development and Training Act (MDTA) and its amendments since 1962, the study focuses on the vocational education program and the development of its legislation and administration. The 12 years of manpower training legislation from MDTA to the Comprehensive Employment and Training Act…

  15. Neighborhood-Based Child Care Services for the Inner City. Manpower for the Human Services.

    ERIC Educational Resources Information Center

    Kassel, Myrna Bordelon

    This monograph is the fifth in a series summarizing the work progress of the Human Services Manpower Career Center, a special research and development project funded by the U. S. Department of Labor. This report describes the action taken by a committee of child care workers, educators, welfare mothers, manpower specialists, and concerned lay…

  16. TECHNOLOGY AND MANPOWER IN DESIGN AND DRAFTING 1965-75. MANPOWER RESEARCH BULLETIN NUMBER 12.

    ERIC Educational Resources Information Center

    Office of Manpower Policy, Evaluation, and Research (DOL), Washington, DC.

    AS PART OF AN EXPERIMENTAL AND DEMONSTRATION PROJECT LAUNCHED BY THE DEPARTMENT OF LABOR IN 1965 TO EMPHASIZE LIKELY FUTURE TECHNOLOGICAL AND MANPOWER CHANGES, THIS STUDY OF THE DESIGN AND DRAFTING PROCESS AIMED TO IDENTIFY THE MAJOR TECHNOLOGICAL CHANGES IN THE NEXT 10 YEARS, TO DETERMINE THE EXTENT AND RATE OF DIFFUSION OF THESE CHANGES, AND TO…

  17. Manpower Studies in Postsecondary Education. ERIC/Higher Education Research Report No. 10.

    ERIC Educational Resources Information Center

    Norris, Donald M.; And Others

    Manpower information and projections in postsecondary education have present value in the sense that they guide today's decisions based on a view of what tomorrow's world will be like. But manpower decisions are complicated by the fact that the decision-maker, be it a government, an institution, or an individual, must also take account of how…

  18. Physician Manpower in Georgia: Report of the Task Force for Physician Manpower to the Georgia Comprehensive Health Planning Council.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Public Health, Atlanta. Office of Comprehensive Health Planning.

    This report is a result of a study of the state's physician manpower by representatives of the fields of medical education and professional practice in Georgia. Contents include introduction and principal findings, recommendations, and analysis of present supply of physicians and other data. Recommendations suggest improvement of the utilization…

  19. [The characteristic of stomatologic service manpower in Omsk region].

    PubMed

    Prokop'ev, K A; Ravdugina, T G

    2013-01-01

    The article considers the network and manpower characteristics of stomatologic service in Omsk oblast during 2006-3011. The results are presented concerning statistical analysis of dynamics of manpower size and staffing of specialists in stomatologic rooms (departments) in state (budget) health institutions. The differences are demonstrated concerning the accessibility of stomatologic care to residents of city and rural regions of oblast.

  20. Health Manpower Planning: A Comparative Study in Four Countries. Volume 1. Health Manpower References.

    ERIC Educational Resources Information Center

    Whiteside, Daniel F.; And Others

    The health manpower planning experiences of four countries reported here were presented in a traveling seminar held for member countries of the Pan American Health Organization. Focus was on what should be carried out in any country to coordinate the training of health workers with the operation of health services. Following the introduction, the…

  1. The University and Manpower Educational Services: An Experimental and Demonstration Project.

    ERIC Educational Resources Information Center

    Williams, J. Earl

    The goal of the Manpower Educational Services Project at the University of Houston was, in the short run, to explore using a university's capability and position in the community to contribute to the understanding and functioning of manpower programs in its geographic area. In the long run, it was hoped that a permanent center could be established…

  2. 78 FR 42080 - Privacy Act of 1974; CMS Computer Match No. 2013-07; HHS Computer Match No. 1303; DoD-DMDC Match...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... with the Department of Defense (DoD), Defense Manpower Data Center (DMDC). We have provided background... & Medicaid Services and the Department of Defense, Defense Manpower Data Center for the Determination of...), Centers for Medicare & Medicaid Services (CMS), and Department of Defense (DoD), Defense Manpower Data...

  3. Report of Conference of New Manpower Researchers (September 26-27, 1968).

    ERIC Educational Resources Information Center

    National Manpower Policy Task Force, Washington, DC.

    The second annual Conference of New Manpower Researchers was held to: (1) provide an opportunity for new researchers to meet and establish contact with other professionals in the field and to exchange ideas and information, (2) aid new researchers by allowing them to present their work to their peers and senior manpower people, and (3) permit the…

  4. Opportunities for Improving the Institutional Manpower Training Program in South Carolina. Report to the Congress.

    ERIC Educational Resources Information Center

    Comptroller General of the U.S., Washington, DC.

    This study was conducted to assess the results of institutional manpower training in South Carolina conducted under the Manpower Development and Training Act at two skills centers, at 10 state instructional centers, and at public and private facilities throughout the state. The study found that about 72 percent of 9,800 trainees graduated, and…

  5. Structural Issues in the Supply and Demand for Scientific Manpower: Implications for National Manpower Policy.

    ERIC Educational Resources Information Center

    Weathersby, George B.

    This paper argues that, in addition to responding to surface manifestations of imbalance in scientific manpower supply and demand, we should examine and understand far better than we now do the nature and extent of the structural forces operative on the supply and demand of scientific talent. The author reviewed the literature and the parameters…

  6. Adaptation and Employment of Special Groups of Manpower. Implementing an Active Manpower Policy; Conclusions of the Manpower and Social Affairs Committee.

    ERIC Educational Resources Information Center

    Organisation for Economic Cooperation and Development, Paris (France).

    Conclusions are presented indicating the role which public bodies, employers, trade unions, and other private groups can play in improving the employment opportunities of special groups, such as older workers, workers with family responsibilities, and workers of rural origin engaged in non-agricultural employment. Because of the increasing number…

  7. Comparative Analysis of Four Manpower Nursing Requirements Models. Health Manpower References. [Nurse Planning Information Series, No. 6].

    ERIC Educational Resources Information Center

    Deane, Robert T.; Ro, Kong-Kyun

    The analysis and description of four manpower nursing requirements models-- the Pugh-Roberts, the Vector, the Community Systems Foundation (CSF), and the Western Interstate Commission of Higher Education (WICHE)--are presented in this report. The introduction provides an overview of the project which was designed to analyze these different models.…

  8. Manpower Systems Integration Factors for Frigate Design in the Turkish Navy

    DTIC Science & Technology

    2016-12-01

    factors for frigate design in the Turkish Navy. The qualitative and quantitative analyses of the correlation between ship design specifications and...frigates. The correlation between the ship design characteristics and the manpower requirements is supported by the quantitative analysis. This... design in the Turkish Navy. The qualitative and quantitative analyses of the correlation between ship design specifications and manpower requirements

  9. High Level Manpower and Technological Change in the Steel Industry: Implications for Corporate Manpower Planning.

    ERIC Educational Resources Information Center

    Hiestand, Dale L.

    The purpose of this study was to examine the role that high level manpower plays in the establishment of new technologies at the plant and industry level. The steel industry was selected as an appropriate industry to approach these questions due to: its considerable technological changes; its straightforward, easier-to-understand technology; its…

  10. Enterprise Planning for Change; Co-ordination of Manpower and Technical Planning. Industrial Relations Aspects of Manpower Policy, No. 5.

    ERIC Educational Resources Information Center

    Wedderburn, Dorothy

    Forty case studies made by research teams of independents or governmental agencies in Austria, Canada, France, Germany, Norway, Sweden, United Kingdom, and the United States were analyzed to provide managements and trade unions with illustrations of present systems of technical and manpower changes at the enterprise level and to describe the…

  11. [The manpower market for physicians in the Nordic countries 1980-2000].

    PubMed

    Skoglund, E; Taraldset, A

    2000-06-30

    The ratio between population and active physicians in the Nordic countries has improved from 488 inhabitants per physician in 1980 to 315 in 2000. There is a large mobility of physicians between the countries, contributing to levelling out swings in demand and supply of manpower. Language and culture being similar, physicians can easily adjust to working in a neighbouring country. Iceland is special in this respect, as a surplus of Icelandic physicians has always found work in the other Nordic countries. Of course, their numbers are small relative to the total number of active physicians in the Nordic countries, now approximately 76,000. The number of students admitted to Nordic medical faculties has changed in line with swings in estimated future demand for manpower. Today, numbers are increasing again; this year, approximately 2,900 students will be admitted. Norway stands apart from the other Nordic countries in terms of medical manpower needs. During the last 20 years there has been a continuous shortage of physicians while all the other countries have been through periods of surplus and unemployment among physicians. Manpower forecasts in the early 1980s underestimated the growth in the health care system and hence the demand for medical manpower.

  12. Economic Ergonomic Approach to Design an Optimal Manpower and Mechanization in Rice Production

    NASA Astrophysics Data System (ADS)

    Muanah; Syuaib, M. F.; Liyantono

    2018-05-01

    Productivity of manpower could be improved by considering the economic and ergonomic aspect. The ergonomic aspect (human factor) is required to design an optimal manpower, while in the economic aspect, the well being of manpower could be evaluated from the amount of received income based on their work capability. This research was conducted on February 2016 to January 2017 in Gapoktan Silih Asih rice field Cigombong, Bogor. This study aims to analyze the income of manpower based on current conditions, increasement of working hours and mechanization addition. The results showed that manpower income based on the current condition and ergonomic consideration was Rp 1,174,030/person.month, by increasing the working hours with ergonomic consideration the obtained income was Rp 1,766,204/person.month. the revenues were based on the existing work system even though the increasement of working hours have not provided optimal income due to low productivity. Therefore the results of analysis with the addition of selective mechanization, showed self-ownership machinery was more profitable the obtained income have more than the Bogor minimum wage standard of Rp 2,969,325/person.month.

  13. An Integrated Constraint Programming Approach to Scheduling Sports Leagues with Divisional and Round-robin Tournaments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.

  14. Remote sensing for urban planning

    NASA Technical Reports Server (NTRS)

    Davis, Bruce A.; Schmidt, Nicholas; Jensen, John R.; Cowen, Dave J.; Halls, Joanne; Narumalani, Sunil; Burgess, Bryan

    1994-01-01

    Utility companies are challenged to provide services to a highly dynamic customer base. With factory closures and shifts in employment becoming a routine occurrence, the utility industry must develop new techniques to maintain records and plan for expected growth. BellSouth Telecommunications, the largest of the Bell telephone companies, currently serves over 13 million residences and 2 million commercial customers. Tracking the movement of customers and scheduling the delivery of service are major tasks for BellSouth that require intensive manpower and sophisticated information management techniques. Through NASA's Commercial Remote Sensing Program Office, BellSouth is investigating the utility of remote sensing and geographic information system techniques to forecast residential development. This paper highlights the initial results of this project, which indicate a high correlation between the U.S. Bureau of Census block group statistics and statistics derived from remote sensing data.

  15. [The state of obstetrics in the national republics of North Caucasus during the first half of XX century].

    PubMed

    Iakh'iaeva, Z I; Bataev, Kh M

    2011-01-01

    In Caucasus, during the first half of XX century the organization of obstetric gynecological care of women accompanied by significant problems to be resolved in the conditions of burning deficiency of material and manpower resources. In the early 1950s the functioning of the system of obstetrics in the North Caucasus region needed more intensive organizational efforts and highest possible involvement of medical science achievements.

  16. Manpower Management: No Tiered Readiness - Enabling The Nation’s Force in Readiness

    DTIC Science & Technology

    2013-04-09

    physically qualified (medical, dental , panorex) 2,D, D,H,Q Pregnancy (after determination by proper authority) N Postpartum (up to six...identifying surfaces and gaps are elemental to both the Marine Corps Planning Process and this study, and assist in the overall problem framing. Manning...of the Marine Corps on T/Os. To assist the deputy commandants in this task, each occupational field retains an occupational field sponsor. The

  17. Personnel and Staff Development Planning for the Human Services. Volume 1. Final Report of the Florida Board of Regents, Office of Career Planning and Curriculum Development for the Human Services.

    ERIC Educational Resources Information Center

    Austin, Michael J.; And Others

    The Office of Career Planning and Curriculum Development for the Human Services was established in September 1972 to study the problems associated with manpower utilization and the lack of career mobility within the Florida Department of Health and Rehabilitative Services (HRS). Objectives of the study were: (1) to identify the contributing…

  18. Health Manpower Requirements for the Achievement of Health for All by the Year 2000 through Primary Health Care. Report of a WHO Expert Committee. Technical Report Series 717.

    ERIC Educational Resources Information Center

    World Health Organization, Geneva (Switzerland).

    This report explains what will be necessary to achieve health for all people in the world by the year 2000 through primary health care. The booklet is organized in six chapters. The first chapter introduces the premise and describes current socioeconomic development and prospects for the future, along with current problems of health personnel…

  19. Translations on Eastern Europe, Political, Sociological, and Military Affairs, Number 1438

    DTIC Science & Technology

    1977-08-29

    general sociological problems and developments in such areas as demography , manpower, public health and welfare, education, and mass organizations; and...importance on the development of the whole system of national edu- cation and upbringing of the young generation. This is a national matter: Its pioneers ... longevity of Romanian citizens. In the prewar period the average lifetime was about U2 years, whereas today it has reached nearly 70 years (72 for

  20. Performance of Extended Local Clustering Organization (LCO) for Large Scale Job-Shop Scheduling Problem (JSP)

    NASA Astrophysics Data System (ADS)

    Konno, Yohko; Suzuki, Keiji

    This paper describes an approach to development of a solution algorithm of a general-purpose for large scale problems using “Local Clustering Organization (LCO)” as a new solution for Job-shop scheduling problem (JSP). Using a performance effective large scale scheduling in the study of usual LCO, a solving JSP keep stability induced better solution is examined. In this study for an improvement of a performance of a solution for JSP, processes to a optimization by LCO is examined, and a scheduling solution-structure is extended to a new solution-structure based on machine-division. A solving method introduced into effective local clustering for the solution-structure is proposed as an extended LCO. An extended LCO has an algorithm which improves scheduling evaluation efficiently by clustering of parallel search which extends over plural machines. A result verified by an application of extended LCO on various scale of problems proved to conduce to minimizing make-span and improving on the stable performance.

  1. Optimization of Airport Surface Traffic: A Case-Study of Incheon International Airport

    NASA Technical Reports Server (NTRS)

    Eun, Yeonju; Jeon, Daekeun; Lee, Hanbong; Jung, Yoon C.; Zhu, Zhifan; Jeong, Myeongsook; Kim, Hyounkong; Oh, Eunmi; Hong, Sungkwon

    2017-01-01

    This study aims to develop a controllers decision support tool for departure and surface management of ICN. Airport surface traffic optimization for Incheon International Airport (ICN) in South Korea was studied based on the operational characteristics of ICN and airspace of Korea. For surface traffic optimization, a multiple runway scheduling problem and a taxi scheduling problem were formulated into two Mixed Integer Linear Programming (MILP) optimization models. The Miles-In-Trail (MIT) separation constraint at the departure fix shared by the departure flights from multiple runways and the runway crossing constraints due to the taxi route configuration specific to ICN were incorporated into the runway scheduling and taxiway scheduling problems, respectively. Since the MILP-based optimization model for the multiple runway scheduling problem may be computationally intensive, computation times and delay costs of different solving methods were compared for a practical implementation. This research was a collaboration between Korea Aerospace Research Institute (KARI) and National Aeronautics and Space Administration (NASA).

  2. Optimization of Airport Surface Traffic: A Case-Study of Incheon International Airport

    NASA Technical Reports Server (NTRS)

    Eun, Yeonju; Jeon, Daekeun; Lee, Hanbong; Jung, Yoon Chul; Zhu, Zhifan; Jeong, Myeong-Sook; Kim, Hyoun Kyoung; Oh, Eunmi; Hong, Sungkwon

    2017-01-01

    This study aims to develop a controllers' decision support tool for departure and surface management of ICN. Airport surface traffic optimization for Incheon International Airport (ICN) in South Korea was studied based on the operational characteristics of ICN and airspace of Korea. For surface traffic optimization, a multiple runway scheduling problem and a taxi scheduling problem were formulated into two Mixed Integer Linear Programming (MILP) optimization models. The Miles-In-Trail (MIT) separation constraint at the departure fix shared by the departure flights from multiple runways and the runway crossing constraints due to the taxi route configuration specific to ICN were incorporated into the runway scheduling and taxiway scheduling problems, respectively. Since the MILP-based optimization model for the multiple runway scheduling problem may be computationally intensive, computation times and delay costs of different solving methods were compared for a practical implementation. This research was a collaboration between Korea Aerospace Research Institute (KARI) and National Aeronautics and Space Administration (NASA).

  3. Multi-Objective Scheduling for the Cluster II Constellation

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Giuliano, Mark

    2011-01-01

    This paper describes the application of the MUSE multiobjecctive scheduling framework to the Cluster II WBD scheduling domain. Cluster II is an ESA four-spacecraft constellation designed to study the plasma environment of the Earth and it's magnetosphere. One of the instruments on each of the four spacecraft is the Wide Band Data (WBD) plasma wave experiment. We have applied the MUSE evolutionary algorithm to the scheduling problem represented by this instrument, and the result has been adopted and utilized by the WBD schedulers for nearly a year. This paper describes the WBD scheduling problem, its representation in MUSE, and some of the visualization elements that provide insight into objective value tradeoffs.

  4. Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem.

    PubMed

    Chen, Xiaopan; Kong, Yunfeng; Dang, Lanxue; Hou, Yane; Ye, Xinyue

    2015-01-01

    As a class of hard combinatorial optimization problems, the school bus routing problem has received considerable attention in the last decades. For a multi-school system, given the bus trips for each school, the school bus scheduling problem aims at optimizing bus schedules to serve all the trips within the school time windows. In this paper, we propose two approaches for solving the bi-objective school bus scheduling problem: an exact method of mixed integer programming (MIP) and a metaheuristic method which combines simulated annealing with local search. We develop MIP formulations for homogenous and heterogeneous fleet problems respectively and solve the models by MIP solver CPLEX. The bus type-based formulation for heterogeneous fleet problem reduces the model complexity in terms of the number of decision variables and constraints. The metaheuristic method is a two-stage framework for minimizing the number of buses to be used as well as the total travel distance of buses. We evaluate the proposed MIP and the metaheuristic method on two benchmark datasets, showing that on both instances, our metaheuristic method significantly outperforms the respective state-of-the-art methods.

  5. The application of artificial intelligence to astronomical scheduling problems

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike to other problem domains, and plans for the future evolution of the system.

  6. The Development and Diffusion of the Training and Technology Program: A Decade of Development of Manpower Training, 1965-1975. Final Report.

    ERIC Educational Resources Information Center

    Demik, Gary H.; And Others

    The report describes the development of a model training program, Training and Technology, and subsequent efforts to diffuse the innovation. Before the inception of TAT, a survey study, Resources for Southern Manpower Development, had indicated that the South had considerable manpower development potential and need. TAT was organized by Oak Ridge…

  7. LONG-TERM MANPOWER PROJECTIONS, PROCEEDINGS OF A CONFERENCE CONDUCTED BY THE RESEARCH PROGRAM ON UNEMPLOYMENT AND THE AMERICAN ECONOMY (WASHINGTON, D.C., JUNE 25-26, 1964).

    ERIC Educational Resources Information Center

    GORDON, R.A.

    FORTY-ONE REPRESENTATIVES FROM EDUCATIONAL INSTITUTIONS, THE NATIONAL GOVERNMENT, AND THE NATIONAL SCIENCE FOUNDATION MET IN A 2-DAY CONFERENCE TO DISCUSS MANPOWER PROJECTIONS. GENERAL AREAS CONSIDERED WERE (1) METHODS NOW BEING USED WITHIN THE FEDERAL GOVERNMENT TO MAKE MANPOWER PROJECTIONS, (2) GROUPS OUTSIDE THE GOVERNMENT CONCERNED WITH MAKING…

  8. Labor Market Identification Model; Procedure in Labor Market Planning for Vocational Education Programs of Columbia Junior College.

    ERIC Educational Resources Information Center

    Columbia Junior Coll., CA.

    This document is designed as a workbook for those planning to conduct labor market surveys. The data gathering procedures were specifically designed for a small rural college with limited financial and manpower resources. The purposes of such a survey are to identify manpower needs, to make the college known as a source of trained manpower, and to…

  9. A Report and Basic Proposal to Provide Alaskan Manpower Entry into the Pipeline and Related Construction Skills via Technical Training, Immediate and Intermediate.

    ERIC Educational Resources Information Center

    Bland, Laurel L.

    To make policy makers and others more aware of possibilities for utilizing Alaskan manpower, information has been gathered on the manpower demand to construct the proposed 800 mile Alaska oil pipeline and its supporting system. The recruitment and training of chronically unemployed or underemployed workers (largely Eskimos and Indians) is being…

  10. Manpower and Employment Policies for Developing Countries, Proceedings of the International Manpower Seminar. (7th, September 28-December 10, 1966).

    ERIC Educational Resources Information Center

    Bussey, Ellen M.

    The Seminar, a joint venture of the Agency for International Development and the Labor Department of the United States, brought together 29 participants from 20 developing countries for the purpose of exchanging ideas and experiences on manpower programs and planning efforts. These proceedings are the result of notes taken by reporters during the…

  11. Health Manpower Credentialing: Legal Implications of Institutional Licensure. Health Manpower Policy Discussion Paper Series No.: C3.

    ERIC Educational Resources Information Center

    Crane, Stephen

    The objective of this analysis is to outline in broad fashion the current trends and issues in the licensure of health manpower and to contrast two proposed alternative systems of credentialing that focus on licensure of health care institutions instead of individual health care providers. The argument of the analysis is that the current system of…

  12. Non-Evolutionary Algorithms for Scheduling Dependent Tasks in Distributed Heterogeneous Computing Environments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wayne F. Boyer; Gurdeep S. Hura

    2005-09-01

    The Problem of obtaining an optimal matching and scheduling of interdependent tasks in distributed heterogeneous computing (DHC) environments is well known to be an NP-hard problem. In a DHC system, task execution time is dependent on the machine to which it is assigned and task precedence constraints are represented by a directed acyclic graph. Recent research in evolutionary techniques has shown that genetic algorithms usually obtain more efficient schedules that other known algorithms. We propose a non-evolutionary random scheduling (RS) algorithm for efficient matching and scheduling of inter-dependent tasks in a DHC system. RS is a succession of randomized taskmore » orderings and a heuristic mapping from task order to schedule. Randomized task ordering is effectively a topological sort where the outcome may be any possible task order for which the task precedent constraints are maintained. A detailed comparison to existing evolutionary techniques (GA and PSGA) shows the proposed algorithm is less complex than evolutionary techniques, computes schedules in less time, requires less memory and fewer tuning parameters. Simulation results show that the average schedules produced by RS are approximately as efficient as PSGA schedules for all cases studied and clearly more efficient than PSGA for certain cases. The standard formulation for the scheduling problem addressed in this paper is Rm|prec|Cmax.,« less

  13. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  14. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  15. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  16. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  17. Blood Glucose Levels and Problem Behavior

    ERIC Educational Resources Information Center

    Valdovinos, Maria G.; Weyand, David

    2006-01-01

    The relationship between varying blood glucose levels and problem behavior during daily scheduled activities was examined. The effects that varying blood glucose levels had on problem behavior during daily scheduled activities were examined. Prior research has shown that differing blood glucose levels can affect behavior and mood. Results of this…

  18. Planning as a Precursor to Scheduling for Space Station Payload Operations

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Maxwell, Theresa

    1995-01-01

    Contemporary schedulers attempt to solve the problem of best fitting a set of activities into an available timeframe while still satisfying the necessary constraints. This approach produces results which are optimized for the region of time the scheduler is able to process, satisfying the near term goals of the operation. In general the scheduler is not able to reason about the activities which precede or follow the window into which it is inputs to scheduling so that the intermediate placing activities. This creates a problem for operations which are composed of many activities spanning long durations (which exceed the scheduler's reasoning horizon) such as the continuous operations environment for payload operations on the Space Station. Not only must the near term scheduling objectives be met, but somehow the results of near term scheduling must be made to support the attainment of long term goals.

  19. Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1992-01-01

    This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

  20. Solving the flexible job shop problem by hybrid metaheuristics-based multiagent model

    NASA Astrophysics Data System (ADS)

    Nouri, Houssem Eddine; Belkahla Driss, Olfa; Ghédira, Khaled

    2018-03-01

    The flexible job shop scheduling problem (FJSP) is a generalization of the classical job shop scheduling problem that allows to process operations on one machine out of a set of alternative machines. The FJSP is an NP-hard problem consisting of two sub-problems, which are the assignment and the scheduling problems. In this paper, we propose how to solve the FJSP by hybrid metaheuristics-based clustered holonic multiagent model. First, a neighborhood-based genetic algorithm (NGA) is applied by a scheduler agent for a global exploration of the search space. Second, a local search technique is used by a set of cluster agents to guide the research in promising regions of the search space and to improve the quality of the NGA final population. The efficiency of our approach is explained by the flexible selection of the promising parts of the search space by the clustering operator after the genetic algorithm process, and by applying the intensification technique of the tabu search allowing to restart the search from a set of elite solutions to attain new dominant scheduling solutions. Computational results are presented using four sets of well-known benchmark literature instances. New upper bounds are found, showing the effectiveness of the presented approach.

  1. Novel technique for tracking manpower and work packages: a useful tool for the team and management

    NASA Astrophysics Data System (ADS)

    Gill, R.; Gracia, G.; Lupton, R. H.; O'Mullane, W.

    2014-08-01

    In these times of austerity it is becoming more and more important to justify the need for manpower to management. Additionally, with the fast pace of today's projects the need for tools that facilitate teams to not only plan, but also track their work, are essential. The practice of planning work packages and the associated manpower has been about for a while but little is done to really cross-check that planning against reality. In this paper these elements are brought together through a number of tools that make up the end to end process of planning, tracking and reporting of work package progress and manpower usage.

  2. An Investigation of the Educational Needs of Health Sciences Library Manpower: III. Manpower Supply and Demand in Health Sciences Libraries *

    PubMed Central

    Rothenberg, Lesliebeth; Kronick, David A.; Rees, Alan M.

    1971-01-01

    An investigation of the manpower requirements of health sciences libraries and of educational programs appropriate to these manpower needs was begun in March 1968. To date, 4,727 libraries have been identified as being used by 14,000 health sciences institutions and programs. Of this total, 2,628 are hospital libraries; 1,328 are health sciences libraries and collections located outside of hospitals; and 771 are academic or public libraries. Within these libraries some 14,938 persons are directly involved, either full- or part-time, in the delivery of health sciences library services. Of the total work force, 5,861 persons are employed in hospital libraries and 9,077 are employed in health sciences libraries and collections. The ratio between professional and nonprofessional employees is 1:2; professional and nonprofessional status was assigned by the chief librarian. Survey data indicate a 7 percent manpower shortage in positions classified as professional, and a 3 percent shortage in positions classified as nonprofessional. PMID:5542913

  3. Projecting manpower to attain quality

    NASA Technical Reports Server (NTRS)

    Rone, K. Y.

    1983-01-01

    The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.

  4. Colloquy and workshops: regional implications of the engineering manpower requirements of the National Energy Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Segool, H. D.

    1979-05-01

    The crucial interrelationships of engineering manpower, technological innovation, productivity and capital re-formaton were keynoted. Near-term, a study has indicated a much larger New England energy demand-reduction/economic/market potential, with a probably larger engineering manpower requirement, for energy-conservation measures characterized by technological innovation and cost-effective capital services than for alternative energy-supply measures. Federal, regional, and state energy program responsibilities described a wide-ranging panorama of activities among many possible energy options which conveyed much endeavor without identifiable engineering manpower demand coefficients. Similarly, engineering manpower assessment data was described as uneven and unfocused to the energy program at the national level, disaggregated data asmore » non-existent at the regional/state levels, although some qualitative inferences were drawn. A separate abstract was prepared for each of the 16 individual presentations for the DOE Energy Data Base (EDB); 14 of these were selected for Energy Abstracts for Policy Analysis (EAPA) and 2 for Energy Research Abstracts (ERA).« less

  5. Periodic Heterogeneous Vehicle Routing Problem With Driver Scheduling

    NASA Astrophysics Data System (ADS)

    Mardiana Panggabean, Ellis; Mawengkang, Herman; Azis, Zainal; Filia Sari, Rina

    2018-01-01

    The paper develops a model for the optimal management of logistic delivery of a given commodity. The company has different type of vehicles with different capacity to deliver the commodity for customers. The problem is then called Periodic Heterogeneous Vehicle Routing Problem (PHVRP). The goal is to schedule the deliveries according to feasible combinations of delivery days and to determine the scheduling of fleet and driver and routing policies of the vehicles. The objective is to minimize the sum of the costs of all routes over the planning horizon. We propose a combined approach of heuristic algorithm and exact method to solve the problem.

  6. Strategic Gang Scheduling for Railroad Maintenance

    DOT National Transportation Integrated Search

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  7. Estimates of the absolute error and a scheme for an approximate solution to scheduling problems

    NASA Astrophysics Data System (ADS)

    Lazarev, A. A.

    2009-02-01

    An approach is proposed for estimating absolute errors and finding approximate solutions to classical NP-hard scheduling problems of minimizing the maximum lateness for one or many machines and makespan is minimized. The concept of a metric (distance) between instances of the problem is introduced. The idea behind the approach is, given the problem instance, to construct another instance for which an optimal or approximate solution can be found at the minimum distance from the initial instance in the metric introduced. Instead of solving the original problem (instance), a set of approximating polynomially/pseudopolynomially solvable problems (instances) are considered, an instance at the minimum distance from the given one is chosen, and the resulting schedule is then applied to the original instance.

  8. MANPOWER REPORT OF THE PRESIDENT AND A REPORT ON MANPOWER REQUIREMENTS, RESOURCES, UTILIZATION, AND TRAINING, MARCH 1966.

    ERIC Educational Resources Information Center

    Department of Labor, Washington, DC.

    HIGHLIGHTS OF THE PRESIDENT'S REPORT INCLUDED (1) IN 1965 MORE THAN 100,000 PERSONS COMPLETED TRAINING UNDER THE MANPOWER DEVELOPMENT AND TRAINING ACT, (2) 3 OF EVERY 4 WERE PLACED IN JOBS WITHIN 90 DAYS OF COMPLETION OF THE COURSE, (3) MORE THAN 500,000 YOUNG MEN AND WOMEN WERE APPROVED FOR PARTICIPATION IN THE NEIGHBORHOOD YOUTH CORPS, (4)…

  9. 2015 Workplace and Gender Relations Survey of Reserve Component Members: Tabulations of Responses

    DTIC Science & Technology

    2016-03-17

    Report 6. AUTHOR(S) DefenseResearch, Surveys,andStatistics Center (RSSC) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Defense Manpower Data Center...2015 WORKPLACE AND GENDER RELATIONS SURVEY OF RESERVE COMPONENT MEMBERS: TABULATIONS OF RESPONSES Defense Manpower Data Center Defense Research...Surveys, and Statistics Center 4800 Mark Center Drive, Suite 04E25-01, Alexandria, VA 22350-4000 ii DMDC Acknowledgments The Defense Manpower Data

  10. 2015 Military Investigation and Justice Experience Survey (MIJES). Overview Report

    DTIC Science & Technology

    2016-03-16

    FMG) b Defense Manpower Data Center (DMDC) a SRA International, Inc., A CSRA Company Defense Manpower Data Center 4800 Mark Center Drive, Suite... Manpower Data Center (DMDC) is indebted to numerous people for their assistance with the 2015 Military Investigation and Justice Experience Survey (2015...Statistical Analysis Macros to calculate the results presented in this report. Ms. Sue Reinhold provided assistance with programming and merging contact

  11. A Theoretical Manpower Optimization Model for the Air Force Installation Contracting Agency (AFICA)

    DTIC Science & Technology

    2017-12-01

    development and enterprise-wide market intelligence. The theoretical manpower model proposed by this project optimizes manpower in respect to contracting...procurement needs and/or more effectively leverage spend, market position, market knowledge (e.g., price benchmarks), and capabilities (e.g., IT...CONS level because the process savings are not clearly traceable to a contract action. For example, to augment the market intelligence of category

  12. Lean Manufacturing and the Infantry: Retaining Quality during Total Mobilization

    DTIC Science & Technology

    United States last decisive war against a peer threat, World War II, required significant manpower resources. Prioritizing quality manpower ...distribution to technical jobs resulted in the degradation of the infantry, which then required the Army to implement corrective measures to reverse the...deficiency in quality. Should another decisive war occur in the future, the lethality and speed of modern warfare will increase the demand for manpower , which

  13. Sharing the Burden and Risk: An Operational Assessment of the Reserve Components in Operation Iraqi Freedom

    DTIC Science & Technology

    2016-10-01

    Manpower Data Center (DMDC) for data extracts identifying monthly deployments from September 2001 through December 2014. This data would answer questions... Manpower Data Center (DMDC) databases captured which service members were mobilized and deployed. Government history offices, lessons learned...develop MOEs and MOPs to conduct assessments. 1. Data Extracts Concurrent with engagement efforts, IDA queried the Defense Manpower Data Center (DMDC

  14. Optimizing Marine Corps Pilot Conversion to the Joint Strike Fighter

    DTIC Science & Technology

    2010-06-01

    Office of Civilian Manpower Management. Included are a summary of modeling efforts and the mathematics behind them, models for aggregate manpower...Vajda for the Admiralty of the Royal Navy. They also mention work by one of the first actuaries , John Rowe, who as early as 1779, conducted studies...idea of using mathematical and statistical techniques to obtain better information on the manpower requirements has its roots in personnel research

  15. Higher Education and Development in South-East Asia. Volume III, Part 1, High-level Manpower for Development.

    ERIC Educational Resources Information Center

    Hunter, Guy

    This document, the first part of the third volume of a study concerned with the role of institutions of higher education in the development of countries in South-East Asia, appraises the high-level manpower needs of the region. The report is divided into two sections: the first includes the major comments on the position of high-level manpower in…

  16. Manpower planning using Markov Chain model

    NASA Astrophysics Data System (ADS)

    Saad, Syafawati Ab; Adnan, Farah Adibah; Ibrahim, Haslinda; Rahim, Rahela

    2014-07-01

    Manpower planning is a planning model which understands the flow of manpower based on the policies changes. For such purpose, numerous attempts have been made by researchers to develop a model to investigate the track of movements of lecturers for various universities. As huge number of lecturers in a university, it is difficult to track the movement of lecturers and also there is no quantitative way used in tracking the movement of lecturers. This research is aimed to determine the appropriate manpower model to understand the flow of lecturers in a university in Malaysia by determine the probability and mean time of lecturers remain in the same status rank. In addition, this research also intended to estimate the number of lecturers in different status rank (lecturer, senior lecturer and associate professor). From the previous studies, there are several methods applied in manpower planning model and appropriate method used in this research is Markov Chain model. Results obtained from this study indicate that the appropriate manpower planning model used is validated by compare to the actual data. The smaller margin of error gives a better result which means that the projection is closer to actual data. These results would give some suggestions for the university to plan the hiring lecturers and budgetary for university in future.

  17. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  18. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  19. Uncertainty management by relaxation of conflicting constraints in production process scheduling

    NASA Technical Reports Server (NTRS)

    Dorn, Juergen; Slany, Wolfgang; Stary, Christian

    1992-01-01

    Mathematical-analytical methods as used in Operations Research approaches are often insufficient for scheduling problems. This is due to three reasons: the combinatorial complexity of the search space, conflicting objectives for production optimization, and the uncertainty in the production process. Knowledge-based techniques, especially approximate reasoning and constraint relaxation, are promising ways to overcome these problems. A case study from an industrial CIM environment, namely high-grade steel production, is presented to demonstrate how knowledge-based scheduling with the desired capabilities could work. By using fuzzy set theory, the applied knowledge representation technique covers the uncertainty inherent in the problem domain. Based on this knowledge representation, a classification of jobs according to their importance is defined which is then used for the straightforward generation of a schedule. A control strategy which comprises organizational, spatial, temporal, and chemical constraints is introduced. The strategy supports the dynamic relaxation of conflicting constraints in order to improve tentative schedules.

  20. Simulated annealing with probabilistic analysis for solving traveling salesman problems

    NASA Astrophysics Data System (ADS)

    Hong, Pei-Yee; Lim, Yai-Fung; Ramli, Razamin; Khalid, Ruzelan

    2013-09-01

    Simulated Annealing (SA) is a widely used meta-heuristic that was inspired from the annealing process of recrystallization of metals. Therefore, the efficiency of SA is highly affected by the annealing schedule. As a result, in this paper, we presented an empirical work to provide a comparable annealing schedule to solve symmetric traveling salesman problems (TSP). Randomized complete block design is also used in this study. The results show that different parameters do affect the efficiency of SA and thus, we propose the best found annealing schedule based on the Post Hoc test. SA was tested on seven selected benchmarked problems of symmetric TSP with the proposed annealing schedule. The performance of SA was evaluated empirically alongside with benchmark solutions and simple analysis to validate the quality of solutions. Computational results show that the proposed annealing schedule provides a good quality of solution.

Top