Sample records for mars reference missions

  1. Reference Mission Version 3.0 Addendum to the Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team. Addendum; 3.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G. (Editor)

    1998-01-01

    This Addendum to the Mars Reference Mission was developed as a companion document to the NASA Special Publication 6107, "Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team." It summarizes changes and updates to the Mars Reference Missions that were developed by the Exploration Office since the final draft of SP 6107 was printed in early 1999. The Reference Mission is a tool used by the exploration community to compare and evaluate approaches to mission and system concepts that could be used for human missions to Mars. It is intended to identify and clarify system drivers, significant sources of cost, performance, risk, and schedule variation. Several alternative scenarios, employing different technical approaches to solving mission and technology challenges, are discussed in this Addendum. Comparing alternative approaches provides the basis for continual improvement to technology investment plan and a general understanding of future human missions to Mars. The Addendum represents a snapshot of work in progress in support of planning for future human exploration missions through May 1998.

  2. Human Exploration of Mars Design Reference Architecture 5.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.

    2010-01-01

    This paper provides a summary of the Mars Design Reference Architecture 5.0 (DRA 5.0), which is the latest in a series of NASA Mars reference missions. It provides a vision of one potential approach to human Mars exploration. The reference architecture provides a common framework for future planning of systems concepts, technology development, and operational testing as well as Mars robotic missions, research that is conducted on the International Space Station, and future lunar exploration missions. This summary the Mars DRA 5.0 provides an overview of the overall mission approach, surface strategy and exploration goals, as well as the key systems and challenges for the first three human missions to Mars.

  3. Human Exploration of Mars Design Reference Architecture 5.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.; Hoffman, Stephen J.; Beaty, David W.

    2009-01-01

    This paper provides a summary of the 2007 Mars Design Reference Architecture 5.0 (DRA 5.0), which is the latest in a series of NASA Mars reference missions. It provides a vision of one potential approach to human Mars exploration including how Constellation systems can be used. The reference architecture provides a common framework for future planning of systems concepts, technology development, and operational testing as well as Mars robotic missions, research that is conducted on the International Space Station, and future lunar exploration missions. This summary the Mars DRA 5.0 provides an overview of the overall mission approach, surface strategy and exploration goals, as well as the key systems and challenges for the first three human missions to Mars.

  4. Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

    NASA Astrophysics Data System (ADS)

    Hoffman, Stephen J.; Kaplan, David I.

    1997-07-01

    Personnel representing several NASA field centers have formulated a "Reference Mission" addressing human exploration of Mars. This report summarizes their work and describes a plan for the first human missions to Mars, using approaches that are technically feasible, have reasonable risks, and have relatively low costs. The architecture for the Mars Reference Mission builds on previous work of the Synthesis Group (1991) and Zubrin's (1991) concepts for the use of propellants derived from the Martian Atmosphere. In defining the Reference Mission, choices have been made. In this report, the rationale for each choice is documented; however, unanticipated technology advances or political decisions might change the choices in the future.

  5. Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J. (Editor); Kaplan, David I. (Editor)

    1997-01-01

    Personnel representing several NASA field centers have formulated a "Reference Mission" addressing human exploration of Mars. This report summarizes their work and describes a plan for the first human missions to Mars, using approaches that are technically feasible, have reasonable risks, and have relatively low costs. The architecture for the Mars Reference Mission builds on previous work of the Synthesis Group (1991) and Zubrin's (1991) concepts for the use of propellants derived from the Martian Atmosphere. In defining the Reference Mission, choices have been made. In this report, the rationale for each choice is documented; however, unanticipated technology advances or political decisions might change the choices in the future.

  6. Human Mars Missions: Cost Driven Architecture Assessments

    NASA Technical Reports Server (NTRS)

    Donahue, Benjamin

    1998-01-01

    This report investigates various methods of reducing the cost in space transportation systems for human Mars missions. The reference mission for this task is a mission currently under study at NASA. called the Mars Design Reference Mission, characterized by In-Situ propellant production at Mars. This study mainly consists of comparative evaluations to the reference mission with a view to selecting strategies that would reduce the cost of the Mars program as a whole. One of the objectives is to understand the implications of certain Mars architectures, mission modes, vehicle configurations, and potentials for vehicle reusability. The evaluations start with year 2011-2014 conjunction missions which were characterized by their abort-to-the-surface mission abort philosophy. Variations within this mission architecture, as well as outside the set to other architectures (not predicated on an abort to surface philosophy) were evaluated. Specific emphasis has been placed on identifying and assessing overall mission risk. Impacts that Mars mission vehicles might place upon the Space Station, if it were to be used as an assembly or operations base, were also discussed. Because of the short duration of this study only on a few propulsion elements were addressed (nuclear thermal, cryogenic oxygen-hydrogen, cryogenic oxygen-methane, and aerocapture). Primary ground rules and assumptions were taken from NASA material used in Marshall Space Flight Center's own assessment done in 1997.

  7. Mars Surface Habitability Options

    NASA Technical Reports Server (NTRS)

    Howe, A. Scott; Simon, Matthew; Smitherman, David; Howard, Robert; Toups, Larry; Hoffman, Stephen J.

    2015-01-01

    This paper reports on current habitability concepts for an Evolvable Mars Campaign (EMC) prepared by the NASA Human Spaceflight Architecture Team (HAT). For many years NASA has investigated alternative human Mars missions, examining different mission objectives, trajectories, vehicles, and technologies; the combinations of which have been referred to as reference missions or architectures. At the highest levels, decisions regarding the timing and objectives for a human mission to Mars continue to evolve while at the lowest levels, applicable technologies continue to advance. This results in an on-going need for assessments of alternative system designs such as the habitat, a significant element in any human Mars mission scenario, to provide meaningful design sensitivity characterizations to assist decision-makers regarding timing, objectives, and technologies. As a subset of the Evolvable Mars Campaign activities, the habitability team builds upon results from past studies and recommends options for Mars surface habitability compatible with updated technologies.

  8. HEDS-UP Mars Exploration Forum

    NASA Technical Reports Server (NTRS)

    Budden, Nancy Ann (Editor); Duke, Micheal B. (Editor)

    1998-01-01

    In the early 1990s, Duke and Budden convened a series of workshops addressing mission rationale, exploration objectives, and key constraints and issues facing human crews on Mars. The focal point was "why" the U.S. should fly humans to Mars. In the mid-1990s, strategies for a Mars mission matured and evolved, driven formally by NASA Johnson Space Center's Office of Exploration. In 1997, NASA published a report capturing the current thinking: the NASA Mars Reference Mission. In the 1997-1998 school year, HEDS-UP sponsored six universities to conduct design studies on Mars exploration, using the Reference Mission as a basis for their work. The 1998 Mars Exploration Forum presents the results of these university studies, suggesting "how" we might explore Mars, in terms of specific technical components that would enable human missions to Mars. A primary objective of the HEDS-UP Mars Exploration Forum was to provide a forum for active interaction among NASA, industry, and the university community on the subject of human missions to Mars. NASA scientists and engineers were asked to present the state of exploration for Mars mission options currently under study. This status "snapshot" of current Mars strategies set the stage for the six HEDS-UP universities to present their final design study results. Finally, a panel of industry experts discussed readiness for human missions to Mars as it pertains to the aerospace industries and technologies. A robust poster session provided the backdrop for government-industry-university discussions and allowed for feedback to NASA on the Mars Reference Mission. The common thread woven through the two days was discussion of technologies, proven and emerging, that will be required to launch, land, and sustain human crews on the Red Planet. As this decade (and indeed this millenium) draws to a close, Mars will continue to loom in our sights as the next target for human space exploration. It is our hope that the efforts of the Mars Exploration Forum will serve as one small contribution toward the ultimate goal of humans exploring Mars.

  9. Mars exploration advances: Missions to Mars - Mars base

    NASA Technical Reports Server (NTRS)

    Dejarnette, Fred R.; Mckay, Christopher P.

    1992-01-01

    An overview is presented of Mars missions and related planning with attention given to four mission architectures in the light of significant limitations. Planned unpiloted missions are discussed including the Mars Orbital Mapping Mission, the Mars Rover Sample Return, the Mars Aeronomy Orbiter, and the Mars Environmental Survey. General features relevant to the missions are mentioned including launch opportunities, manned-mission phases, and propulsion options. The four mission architectures are set forth and are made up of: (1) the Mars-exploration infrastructures; (2) science emphasis for the moon and Mars; (3) the moon to stay and Mars exploration; and (4) space resource utilization. The possibility of robotic missions to the moon and Mars is touched upon and are concluded to be possible by the end of the century. The ramifications of a Mars base are discussed with specific reference to habitability and base activities, and the human missions are shown to require a heavy-lift launcher and either chemical/aerobrake or nuclear-thermal propulsion system.

  10. Human Health and Performance Aspects of the Mars Design Reference Mission

    NASA Technical Reports Server (NTRS)

    Charles, John B.

    2000-01-01

    This paper will describe the current planning for exploration-class missions, emphasizing the medical, and human factors aspects of such expeditions. The details of mission architecture are still under study, but a typical Mars design reference mission comprises a six-month transit from Earth to Mar, eighteen months in residence on Mars, and a six-month transit back to Earth. Physiological stressors will include environmental factors such as prolonged exposure to radiation, weightlessness in transit, and hypogravity and a toxic atmosphere while on Mars. Psychological stressors will include remoteness from Earth, confinement, and potential interpersonal conflicts, all complicated by circadian alterations. Medical risks including trauma must also be considered. Results of planning for assuring human health and performance will be presented.

  11. Human Exploration of Mars: The Reference Mission of the NASA Mars Exploration Study Team

    NASA Technical Reports Server (NTRS)

    Connolly, John

    1998-01-01

    The Reference Mission was developed over a period of several years and was published in NASA Special Publication 6107 in July 1997. The purpose of the Reference Mission was to provide a workable model for the human exploration of Mars, which is described in enough detail that alternative strategies and implementations can be compared and evaluated. NASA is continuing to develop the Reference Mission and expects to update this report in the near future. It was the purpose of the Reference Mission to develop scenarios based on the needs of scientists and explorers who want to conduct research on Mars; however, more work on the surface-mission aspects of the Reference Mission is required and is getting under way. Some aspects of the Reference Mission that are important for the consideration of the surface mission definition include: (1) a split mission strategy, which arrives at the surface two years before the arrival of the first crew; (2) three missions to the outpost site over a 6-year period; (3) a plant capable of producing rocket propellant for lifting off Mars and caches of water, O, and inert gases for the life-support system; (4) a hybrid physico-chemical/bioregenerative life-support system, which emphasizes the bioregenerative system more in later parts of the scenario; (5) a nuclear reactor power supply, which provides enough power for all operations, including the operation of a bioregenerative life-support system as well as the propellant and consumable plant; (6) capability for at least two people to be outside the habitat each day of the surface stay; (7) telerobotic and human-operated transportation vehicles, including a pressurized rover capable of supporting trips of several days' duration from the habitat; (7) crew stay times of 500 days on the surface, with six-person crews; and (8) multiple functional redundancies to reduce risks to the crews on the surface. New concepts are being sought that would reduce the overall cost for this exploration program and reducing the risks that are indigenous to Mars exploration. Among those areas being explored are alternative space propulsion approaches, solar vs. nuclear power, and reductions in the size of crews.

  12. Mars Science Laboratory Entry Guidance Improvements for Mars 2018 (DRAFT)

    NASA Technical Reports Server (NTRS)

    Garcia-Llama, Eduardo; Winski, Richard G.; Shidner, Jeremy D.; Ivanov, Mark C.; Grover, Myron R.; Prakash, Ravi

    2011-01-01

    In 2011, the Mars Science Laboratory (MSL) will be launched in a mission to deliver the largest and most capable rover to date to the surface of Mars. A follow on MSL-derived mission, referred to as Mars 2018, is planned for 2018. Mars 2018 goals include performance enhancements of the Entry, Descent and Landing over that of its predecessor MSL mission of 2011. This paper will discuss the main elements of the modified 2018 EDL preliminary design that will increase performance on the entry phase of the mission. In particular, these elements will increase the parachute deploy altitude to allow for more time margin during the subsequent descent and landing phases and reduce the delivery ellipse size at parachute deploy through modifications in the entry reference trajectory design, guidance trigger logic design, and the effect of additional navigation hardware.

  13. The Aerial Regional-scale Environmental Survey (ARES) Mission to Mars

    NASA Technical Reports Server (NTRS)

    Levine, J. S.

    2005-01-01

    ARES is an exploration mission concept for an Aerial Regional-scale Environmental Survey of Mars designed to fly an instrumented platform over the surface of Mars at very low altitudes (1-3 km) for distances of hundreds to thousands of kilometers to obtain scientific data to address fundamental problems in Mars science. ARES helps to fill a gap in the scale and perspective of the Mars Exploration Program and addresses many key COMPLEX/MEPAG questions (e.g., nature and origin of crustal magnetic anomalies) not readily pursued in other parts of the exploration program. ARES supports the human exploration program through key environmental measurements and high-resolution contiguous data essential to reference mission design. Here we describe the major types of scientific goals, candidate instruments, and reference mission profiles.

  14. A Study for Mars Manned Exploration

    NASA Technical Reports Server (NTRS)

    Dorney, Daniel J.; Scimemi, Sam

    2012-01-01

    Over the last five decades there have been numerous studies devoted to developing, launching and conducting a manned mission to Mars by both Russian and U.S. organizations. These studies have proposed various crew sizes, mission length, propulsion systems, habitation modules, and scientific goals. As a first step towards establishing an international partnership approach to a Mars mission, the most recent Russian concepts are explored and then compared to NASA's latest Mars reference mission.

  15. Possible Scenarios for Mars Manned Exploration

    NASA Technical Reports Server (NTRS)

    Dorney, Daniel J.; Schumacher, Daniel M.

    2012-01-01

    Over the last five decades there have been numerous studies devoted to developing, launching and conducting a manned mission to Mars by both Russian and U.S. organizations. These studies have proposed various crew sizes, mission length, propulsion systems, habitation modules, and scientific goals. As a first step towards establishing an international partnership approach to a Mars mission, the most recent Russian concepts are explored and then compared to NASA's current Mars reference mission.

  16. Human Exploration of Mars Design Reference Architecture 5.0

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.

    2009-01-01

    This document reviews the Design Reference Architecture (DRA) for human exploration of Mars. The DRA represents the current best strategy for human missions. The DRA is not a formal plan, but provides a vision and context to tie current systems and technology developments to potential missions to Mars, and it also serves as a benchmark against which alternative architectures can be measured. The document also reviews the objectives and products of the 2007 study that was to update NASA's human Mars mission reference architecture, assess strategic linkages between lunar and Mars strategies, develop an understanding of methods for reducing cost/risk of human missions through investment in research, technology development and synergy with other exploration plans. There is also a review of the process by which the DRA will continue to be refined. The unique capacities of human exploration is reviewed. The possible goals and objectives of the first three human missions are presented, along with the recommendation that the mission involve a long stay visiting multiple sites.The deployment strategy is outlined and diagrammed including the pre-deployment of the many of the material requirements, and a six crew travel to Mars on a six month trajectory. The predeployment and the Orion crew vehicle are shown. The ground operations requirements are also explained. Also the use of resources found on the surface of Mars is postulated. The Mars surface exploration strategy is reviewed, including the planetary protection processes that are planned. Finally a listing of the key decisions and tenets is posed.

  17. Humans to Mars: Fifty Years of Mission Planning, 1950-2000

    NASA Technical Reports Server (NTRS)

    Portree, David S. F.

    2001-01-01

    Contents of this document include: On the Grand Scale; Earliest NASA Concepts; EMPIRE and After; A Hostile Environment; Apogee; Viking and the Resources of Mars; The Case for Mars; Challengers; Space Exploration Initiative; and Design Reference Mission.

  18. Solar-Electrochemical Power System for a Mars Mission

    NASA Technical Reports Server (NTRS)

    Withrow, Colleen A.; Morales, Nelson

    1994-01-01

    This report documents a sizing study of a variety of solar electrochemical power systems for the intercenter NASA study known as 'Mars Exploration Reference Mission'. Power systems are characterized for a variety of rovers, habitation modules, and space transport vehicles based on requirements derived from the reference mission. The mission features a six-person crew living on Mars for 500 days. Mission power requirements range from 4 kWe to 120 kWe. Primary hydrogen and oxygen fuel cells, regenerative hydrogen and oxygen fuel cells, sodium sulfur batteries advanced photovoltaic solar arrays of gallium arsenide on germanium with tracking and nontracking mechanisms, and tent solar arrays of gallium arsenide on germanium are evaluated and compared.

  19. Nuclear Thermal Propulsion Mars Mission Systems Analysis and Requirements Definition

    NASA Technical Reports Server (NTRS)

    Mulqueen, Jack; Chiroux, Robert C.; Thomas, Dan; Crane, Tracie

    2007-01-01

    This paper describes the Mars transportation vehicle design concepts developed by the Marshall Space Flight Center (MSFC) Advanced Concepts Office. These vehicle design concepts provide an indication of the most demanding and least demanding potential requirements for nuclear thermal propulsion systems for human Mars exploration missions from years 2025 to 2035. Vehicle concept options vary from large "all-up" vehicle configurations that would transport all of the elements for a Mars mission on one vehicle. to "split" mission vehicle configurations that would consist of separate smaller vehicles that would transport cargo elements and human crew elements to Mars separately. Parametric trades and sensitivity studies show NTP stage and engine design options that provide the best balanced set of metrics based on safety, reliability, performance, cost and mission objectives. Trade studies include the sensitivity of vehicle performance to nuclear engine characteristics such as thrust, specific impulse and nuclear reactor type. Tbe associated system requirements are aligned with the NASA Exploration Systems Mission Directorate (ESMD) Reference Mars mission as described in the Explorations Systems Architecture Study (ESAS) report. The focused trade studies include a detailed analysis of nuclear engine radiation shield requirements for human missions and analysis of nuclear thermal engine design options for the ESAS reference mission.

  20. Mars Design Reference Architecture 5.0 Study: Executive Summary

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.

    2008-01-01

    The NASA Mars Design Reference Architecture 5.0 Study seeks to update its long term goals and objective for human exploration missions; flight and surface systems for human missions and supporting infrastructure; operational concept for human and robotic exploration of Mars; key challenges including risk and cost drivers; and, its development schedule options. It additionally seeks to assess strategic linkages between lunar and Mars strategies and develop and understanding of methods for reducing the cost/risk of human Mars missions through investment in research, technology development, and synergy with other exploration plans. Recommendations are made regarding conjunction class (long-stay) missions which are seen as providing the best balance of cost, risk, and performance. Additionally, this study reviews entry, descent, and landing challenges; in-space transportation systems; launch vehicle and Orion assessments; risk and risk mitigation; key driving requirements and challenges; and, lunar linkages.

  1. Mars Sample Return: Mars Ascent Vehicle Mission and Technology Requirements

    NASA Technical Reports Server (NTRS)

    Bowles, Jeffrey V.; Huynh, Loc C.; Hawke, Veronica M.; Jiang, Xun J.

    2013-01-01

    A Mars Sample Return mission is the highest priority science mission for the next decade recommended by the recent Decadal Survey of Planetary Science, the key community input process that guides NASAs science missions. A feasibility study was conducted of a potentially simple and low cost approach to Mars Sample Return mission enabled by the use of developing commercial capabilities. Previous studies of MSR have shown that landing an all up sample return mission with a high mass capacity lander is a cost effective approach. The approach proposed is the use of an emerging commercially available capsule to land the launch vehicle system that would return samples to Earth. This paper describes the mission and technology requirements impact on the launch vehicle system design, referred to as the Mars Ascent Vehicle (MAV).

  2. Mars Sample Return: Mars Ascent Vehicle Mission and Technology Requirements

    NASA Technical Reports Server (NTRS)

    Bowles, Jeffrey V.; Huynh, Loc C.; Hawke, Veronica M.

    2013-01-01

    A Mars Sample Return mission is the highest priority science mission for the next decade recommended by the recent Decadal Survey of Planetary Science, the key community input process that guides NASA's science missions. A feasibility study was conducted of a potentially simple and low cost approach to Mars Sample Return mission enabled by the use of new commercial capabilities. Previous studies of MSR have shown that landing an all up sample return mission with a high mass capacity lander is a cost effective approach. The approach proposed is the use of a SpaceX Dragon capsule to land the launch vehicle system that would return samples to Earth. This paper describes the mission and technology requirements impact on the launch vehicle system design, referred to as the Mars Ascent Vehicle (MAV).

  3. Mars Simulant Development for In-Situ Resource Utilization (ISRU) Applications

    NASA Technical Reports Server (NTRS)

    Ming, Doug

    2016-01-01

    Current design reference missions for the Evolvable Mars Campaign (EMC) call for the use of in-situ resources to enable human missions to the surface of Mars. One potential resource is water extracted from the Martian regolith. Current Mars' soil analogs (JSC Mars-1) have 5-10 times more water than typical regolith on Mars. Therefore, there is a critical need to develop Mars simulants to be used in ISRU applications that mimic the chemical, mineralogical, and physical properties of the Martian regolith.

  4. Mars ISRU for Production of Mission Critical Consumables - Options, Recent Studies, and Current State of the Art

    NASA Technical Reports Server (NTRS)

    Sanders, G. B.; Paz, A.; Oryshchyn, L.; Araghi, K.; Muscatello, A.; Linne, D.; Kleinhenz, J.; Peters, T.

    2015-01-01

    In 1978, a ground breaking paper titled, "Feasibility of Rocket Propellant Production on Mars" by Ash, Dowler, and Varsi discussed how ascent propellants could be manufactured on the Mars surface from carbon dioxide collected from the atmosphere to reduce launch mass. Since then, the concept of making mission critical consumables such as propellants, fuel cell reactants, and life support consumables from local resources, commonly known as In-Situ Resource Utilization (ISRU), for robotic and human missions to Mars has been studied many times. In the late 1990's, NASA initiated a series of Mars Human Design Reference Missions (DRMs), the first of which was released in 1997. These studies primarily focused on evaluating the impact of making propellants on Mars for crew ascent to Mars orbit, but creating large caches of life support consumables (water & oxygen) as a backup for regenerative life support systems for long-duration surface stays (>500 days) was also considered in Mars DRM 3.0. Until science data from the Mars Odyssey orbiter and subsequent robotic missions revealed that water may be widely accessable across the surface of Mars, prior Mars ISRU studies were limited to processing Mars atmospheric resources (carbon dioxide, nitrogen, argon, oxygen, and water vapor). In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study which considered water on Mars as a potential resource for the first time in a human mission architecture. While knowledge of both water resources on Mars and the hardware required to excavate and extract the water were very preliminary, the study concluded that a significant reduction in mass and significant enhancements to the mission architecture were possible if Mars water resources were utilized. Two subsequent Mars ISRU studies aimed at reexamining ISRU technologies, processing options, and advancements in the state-of-the-art since 2007 and to better understand the volume and packaging associated with Mars ISRU systems further substantiated the preliminary results from the Mars DRA 5.0 study. This paper will provide an overview of Mars ISRU consumable production options, the analyses, results, and conclusions from the Mars DRA 5.0 (2007), Mars Collaborative (2013), and Mars ISRU Payload for the Supersonic Retro Propulsion (2014) mission studies, and the current state-of-the-art of Mars ISRU technologies and systems. The paper will also briefly discuss the mission architectural implications associated with Mars resource and ISRU processing options.

  5. Conventional vs Biomimetic Approaches to the Exploration of Mars

    NASA Astrophysics Data System (ADS)

    Ellery, A.

    It is not usual to refer to convention in planetary exploration missions by virtue of the innovation required for such projects. The term conventional refers to the methodologies, tools and approaches typically adopted in engineering that are applied to such missions. Presented is a "conventional" Mars rover mission in which the author was involved - ExoMars - into which is interspersed references to examples where biomimetic approaches may yield superior capabilities. Biomimetics is a relatively recently active area of research which seeks to examine how biological systems solve the problem of survival in the natural environment. Biological organisms are autonomous entities that must survive in a hostile world adapting both adaptivity and robustness. It is not then surprising that biomimetics is particularly useful when applied to robotic elements of a Mars exploration mission. I present a number of areas in which biomimetics may yield new solutions to the problem of Mars exploration - optic flow navigation, potential field navigation, genetically-evolved neuro-controllers, legged locomotion, electric motors implementing muscular behaviour, and a biomimetic drill based on the wood wasp ovipositor. Each of these techniques offers an alternative approach to conventional ones. However, the perceptive hurdles are likely to dwarf the technical hurdles in implementing many of these methods in the near future.

  6. Mars Surface Mission Workshop

    NASA Technical Reports Server (NTRS)

    Duke, M. B. (Editor)

    1997-01-01

    A workshop was held at the Lunar and Planetary Institute on September 4-5, 1997, to address the surface elements of the Mars Reference Mission now being reviewed by NASA. The workshop considered the current reference mission and addressed the types of activities that would be expected for science and resource exploration and facilities operations. A set of activities was defined that can be used to construct "vignettes" of the surface mission. These vignettes can form the basis for describing the importance of the surface mission, for illustrating aspects of the surface mission, and for allowing others to extend and revise these initial ideas. The topic is rich with opportunities for additional conceptualization. It is recommended that NASA consider supporting university design teams to conduct further analysis of the possibilities.

  7. Mars rover/sample return mission requirements affecting space station

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The possible interfaces between the Space Station and the Mars Rover/Sample Return (MRSR) mission are defined. In order to constrain the scope of the report a series of seven design reference missions divided into three major types were assumed. These missions were defined to span the probable range of Space Station-MRSR interactions. The options were reduced, the MRSR sample handling requirements and baseline assumptions about the MRSR hardware and the key design features and requirements of the Space Station are summarized. Only the aspects of the design reference missions necessary to define the interfaces, hooks and scars, and other provisions on the Space Station are considered. An analysis of each of the three major design reference missions, is reported, presenting conceptual designs of key hardware to be mounted on the Space Station, a definition of weights, interfaces, and required hooks and scars.

  8. Mars ISPP Precursor (MIP): The First Flight Demonstration of In-Situ Propellant Production

    NASA Technical Reports Server (NTRS)

    Kaplan, David

    1997-01-01

    Strategic planning for human missions of exploration to Mars has conclusively identified in-situ propellant production (ISPP) as an enabling technology. The Mars reference mission concept predeploys a robotic propellant production plant to the planet two years before the planned departure of the crew from Earth. The successful operation of this plant is necessary for the human journey to begin.

  9. Mars Soil-Based Resource Processing and Planetary Protection

    NASA Technical Reports Server (NTRS)

    Sanders, G. B.; Mueller, R. P.

    2015-01-01

    The ability to extract and process resources at the site of exploration into products and services, commonly referred to as In Situ Resource Utilization (ISRU), can have significant benefits for robotic and human exploration missions. In particular, the ability to use in situ resources to make propellants, fuel cell reactants, and life support consumables has been shown in studies to significantly reduce mission mass, cost, and risk, while enhancing or enabling missions not possible without the incorporation of ISRU. In December 2007, NASA completed the Mars Human Design Reference Architecture (DRA) 5.0 study. For the first time in a large scale Mars architecture study, water from Mars soil was considered as a potential resource. At the time of the study, knowledge of water resources (their form, concentration, and distribution) was extremely limited. Also, due to lack of understanding of how to apply planetary protection rules and requirements to ISRU soil-based excavation and processing, an extremely conservative approach was incorporated where only the top several centimeters of ultraviolet (UV) radiated soil could be processed (assumed to be 3% water by mass). While results of the Mars DRA 5.0 study showed that combining atmosphere processing to make oxygen and methane with soil processing to extract water provided the lowest mission mass, atmosphere processing to convert carbon dioxide (CO2) into oxygen was baselined for the mission since it was the lowest power and risk option. With increased knowledge and further clarification of Mars planetary protection rules, and the recent release of the Mars Exploration Program Analysis Group (MEPAG) report on "Special Regions and the Human Exploration of Mars", it is time to reexamine potential water resources on Mars, options for soil processing to extract water, and the implications with respect to planetary protection and Special Regions on Mars.

  10. Mars Global Reference Atmospheric Model 2010 Version: Users Guide

    NASA Technical Reports Server (NTRS)

    Justh, H. L.

    2014-01-01

    This Technical Memorandum (TM) presents the Mars Global Reference Atmospheric Model 2010 (Mars-GRAM 2010) and its new features. Mars-GRAM is an engineering-level atmospheric model widely used for diverse mission applications. Applications include systems design, performance analysis, and operations planning for aerobraking, entry, descent and landing, and aerocapture. Additionally, this TM includes instructions on obtaining the Mars-GRAM source code and data files as well as running Mars-GRAM. It also contains sample Mars-GRAM input and output files and an example of how to incorporate Mars-GRAM as an atmospheric subroutine in a trajectory code.

  11. Ares V Utilization in Support of a Human Mission to Mars

    NASA Technical Reports Server (NTRS)

    Holladay, J. B.; Jaap, J. P.; Pinson, R. M.; Creech, S. D.; Ryan, R. M.; Monk, T. S.; Baggett. K. E.; Runager, M. D.; Dux, I. J.; Hack, K. J.; hide

    2010-01-01

    During the analysis cycles of Phase A-Cycle 3 (PA-C3) and the follow-on 8-wk minicycle of PA-C3', the Ares V team assessed the Ares V PA-C3D configuration to the Mars Design Reference Mission as defined in the Constellation Architecture Requirements Document and further described in Mars Design Reference Architecture 5.0 (DRA 5.0) that was publicly released in July 2009. The ability to support the reference approach for the crewed Mars mission was confirmed through this analysis (7-launch nuclear thermal propulsion (NTP) architecture) and the reference chemical approach as defined in DRA 5.0 (11- or 12-launch chemical propulsion module approach). Additional chemical propulsion options were defined that utilized additional technology investments (primarily in-space cryogenic propellant transfer) that allowed for the same mission to be accomplished with 9 launches rather than the 11 or 12, as documented in DRA 5.0 and associated follow-on activities. This nine-launch chemical propulsion approach showed a unique ability to decouple the architecture from major technological developments (such as zero-boiloff technology or the development of NTP stages) and allowed for a relaxing of the infrastructure investments required to support a very rapid launch rate (30-day launch spacing as documented in DRA 5.0). As an enhancing capability, it also shows promise in allowing for and incorporating the development of a commercial market for cryogenic propellant delivery on orbit, without placing such development on the critical path of beyond low-Earth orbit exploration. The ability of Ares V to support all of the aforementioned options and discussion of key forward work that is required to fully understand the complexities and challenges presented by the Mars mission is further documented herein.

  12. A Phobos-Deimos Mission as an Element of the NASA Mars Design Reference Architecture 5.0

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    2011-01-01

    NASA has conducted a series of mission studies over the past 25 years examining the eventual exploration of the surface of Mars by humans. The latest version of this evolutionary series of design reference missions/architectures - Design Reference Architecture 5 or DRA-5 - was completed in 2007. This paper examines the implications of including a human mission to explore the moons of Mars and teleoperate robots in various locations, but not to land the human crews on Mars, as an element of this reference architecture. Such a mission has been proposed several times during this same 25 year evolution leading up to the completion of DRA-5 primarily as a mission of testing the in-space vehicles and operations while surface vehicles and landers are under development. But such a precursor or test mission has never been explicitly included as an element of this Architecture. This paper will first summarize the key features of the DRA-5 to provide context for the remainder of the assessment. This will include a description of the in-space vehicles that would be the subject of a shakedown test during the Mars orbital mission. A decision tree will be used to illustrate the factors that will be analyzed, and the sequence in which they will be addressed, for this assessment. The factors that will be analyzed include the type of interplanetary transfer orbit (opposition class versus conjunction class), the type of parking orbit (circular versus elliptical), and the type of propulsion technology (high thrust chemical versus nuclear thermal rocket). The manner in which each of these factors impacts an individual mission will be described. In addition to the direct impact of these factors, additional considerations impacting crew health and overall programmatic outcomes will be discussed. Numerical results for each of the factors in the decision tree will be grouped with derived qualitative impacts from crew health and programmatic consideration. These quantitative and qualitative results will be summarized in a pros/cons table as a summary for this analysis.

  13. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document. Volume 1: Major trades. Book 1: Draft final

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents trade studies and reference concept designs accomplished during a study of Space Transfer Concepts and Analyses for Exploration Missions (STCAEM). This volume contains the major top level trades, level 2 trades conducted in support of NASA's Lunar/Mars Exploration Program Office, and a synopsis of the vehicles for different propulsion systems under trade consideration. The vehicles are presented in more detail in other volumes of this report. Book 1 of Volume 1 covers the following analyses: lunar/Mars commonality trades, lunar/Mars mission operations, and Mars transfer systems.

  14. Human Missions to Mars Orbit, Phobos, and Mars Surface Using 100-kWe-Class Solar Electric Propulsion

    NASA Technical Reports Server (NTRS)

    Price, Humphrey W.; Woolley, Ryan C.; Strange, Nathan J.; Baker, John D.

    2014-01-01

    Solar electric propulsion (SEP) tugs in the 100-kWe range, may be utilized to preposition cargo in the Mars system to enable more affordable human missions to Phobos and to the surface of Mars. The SEP tug, a high heritage follow-on to the 50-kWe SEP spacecraft proposed for the Asteroid Redirect Robotic Mission (ARRM), would have the same structure, tankage, electric propulsion components, and avionics as the ARRM version, But with double the number of solar arrays, Hall thrusters, and power processor units (PPUs) and would be accommodated within the same launch envelope defined for ARRM. As a feasibility study, a 950-day human mission to Phobos using a conjunction class trajectory, such as the 2033 opportunity, was developed using two 100-kWe SEP vehicles to preposition a habitat at Phobos and propulsion stages in high Mars orbit (HMO). An architecture concept for a crewed Mars surface lander mission was also developed as a reference to build on the Phobos mission architecture, adding a lander element that could be delivered using chemical propulsion and aerocapture.

  15. Utilizing Mars Global Reference Atmospheric Model (Mars-GRAM 2005) to Evaluate Entry Probe Mission Sites

    NASA Technical Reports Server (NTRS)

    Justh, Hilary L.; Justus, Carl G.

    2008-01-01

    The Mars Global Reference Atmospheric Model (Mars-GRAM 2005) is an engineering-level atmospheric model widely used for diverse mission applications. An overview is presented of Mars-GRAM 2005 and its new features. The "auxiliary profile" option is one new feature of Mars-GRAM 2005. This option uses an input file of temperature and density versus altitude to replace the mean atmospheric values from Mars-GRAM's conventional (General Circulation Model) climatology. Any source of data or alternate model output can be used to generate an auxiliary profile. Auxiliary profiles for this study were produced from mesoscale model output (Southwest Research Institute's Mars Regional Atmospheric Modeling System (MRAMS) model and Oregon State University's Mars mesoscale model (MMM5) model) and a global Thermal Emission Spectrometer (TES) database. The global TES database has been specifically generated for purposes of making Mars-GRAM auxiliary profiles. This data base contains averages and standard deviations of temperature, density, and thermal wind components, averaged over 5-by-5 degree latitude-longitude bins and 15 degree Ls bins, for each of three Mars years of TES nadir data. The Mars Science Laboratory (MSL) sites are used as a sample of how Mars-GRAM' could be a valuable tool for planning of future Mars entry probe missions. Results are presented using auxiliary profiles produced from the mesoscale model output and TES observed data for candidate MSL landing sites. Input parameters rpscale (for density perturbations) and rwscale (for wind perturbations) can be used to "recalibrate" Mars-GRAM perturbation magnitudes to better replicate observed or mesoscale model variability.

  16. Integrated Surface Power Strategy for Mars

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle

    2015-01-01

    A National Aeronautics and Space Administration (NASA) study team evaluated surface power needs for a conceptual crewed 500-day Mars mission. This study had four goals: 1. Determine estimated surface power needed to support the reference mission; 2. Explore alternatives to minimize landed power system mass; 3. Explore alternatives to minimize Mars Lander power self-sufficiency burden; and 4. Explore alternatives to minimize power system handling and surface transportation mass. The study team concluded that Mars Ascent Vehicle (MAV) oxygen propellant production drives the overall surface power needed for the reference mission. Switching to multiple, small Kilopower fission systems can potentially save four to eight metric tons of landed mass, as compared to a single, large Fission Surface Power (FSP) concept. Breaking the power system up into modular packages creates new operational opportunities, with benefits ranging from reduced lander self-sufficiency for power, to extending the exploration distance from a single landing site. Although a large FSP trades well for operational complexity, a modular approach potentially allows Program Managers more flexibility to absorb late mission changes with less schedule or mass risk, better supports small precursor missions, and allows a program to slowly build up mission capability over time. A number of Kilopower disadvantages-and mitigation strategies-were also explored.

  17. Data Assimilation as a Tool for Developing a Mars International Reference Atmosphere

    NASA Technical Reports Server (NTRS)

    Houben, Howard

    2005-01-01

    A new paradigm for a Mars International Reference Atmosphere is proposed. In general, as is certainly now the case for Mars, there are sufficient observational data to specify what the full atmospheric state was under a variety of circumstances (season, dustiness, etc.). There are also general circulation models capable of deter- mining the evolution of these states. If these capabilities are combined-using data assimilation techniques-the resulting analyzed states can be probed to answer a wide variety of questions, whether posed by scientists, mission planners, or others. This system would fulfill all the purposes of an international reference atmosphere and would make the scientific results of exploration missions readily available to the community. Preliminary work on a website that would incorporate this functionality has begun.

  18. Human Exploration of the Moon and Mars: Space Radiation Data, Modeling and Instrumentation Needs

    NASA Technical Reports Server (NTRS)

    Adams, James H.; Barghouty, A. F.; Bhattacharya, M.; Lin, Zi-Wei

    2005-01-01

    On January 14, 2004 President Bush announced the Vision for Space Exploration, a program for long-term human and robotic exploration of the solar system which will include a return of humans to the moon not later than 2020, followed by human missions to Mars. Since this announcement, NASA has been developing plans and mission architectures for these human missions as well as robotic precursor missions. Among the critical needs for research and development in support of this Vision are investigations on the ionizing radiation environment and development of instrumentation to guide NASA in managing the radiation exposure of the crew during the manned missions. For mission planning, models are needed for a reference worst-case solar energetic particle event and a reference worst-case galactic cosmic ray environment. During Lunar missions it will be necessary to carefully manage the radiation exposure of the crew in real time because of the variability of the radiation environment due to solar activity. In particular, prompt warnings will be needed when large solar energetic particle events occur. Accurate predictions will also be needed of the particle flux and flux history at the moon to support critical mission management decisions. A new generation of dosimeters and radiation monitors will also be needed to accompany the crew. These instruments must return data in real time so that they can be used in the critical decisions that must be made if a large solar energetic particle event occurs. This is especially true if it occurs during a lunar excursion. A substantial radiation exposure on extended lunar missions and Mars missions comes from galactic cosmic rays. This exposure must be mitigated by radiation shielding and other measures. During Mars missions the galactic cosmic ray exposure occurs primarily during the cruse phase between the Earth and Mars. This is especially true for opposition class missions. These missions would typically last -430 days with only 30-90 days on Mars. Solar energetic particle events are less of a concern on Mars because of its greater distance from the Sun (approximately 1.5 AU) and the partial protection afforded by its atmosphere (approximately 20 grams per square centimeter). The talk will describe the current plans for future human missions to Earth orbit, the Moon and Mars. The needs for data and models of the radiation environment and radiation detectors to support these missions will be discussed.

  19. Biomedical Aspects of Lunar and Mars Exploration Missions

    NASA Technical Reports Server (NTRS)

    Charles, John B.

    2006-01-01

    Recent long-range planning for exploration-class missions has emphasized the need for anticipating the medical and human factors aspects of such expeditions. Missions returning Americans to the moon for stays of up to 6 months at a time will provide the opportunity to demonstrate the means to function safely and efficiently on another planet. Details of mission architectures are still under study, but a typical Mars design reference mission comprises a six-month transit from Earth to Mars, eighteen months in residence on Mars, and a six-month transit back to Earth. Physiological stresses will come from environmental factors such as prolonged exposure to radiation, weightlessness en route to Mars and then back to Earth, and low gravity and a toxic atmosphere while on Mars. Psychological stressors will include remoteness from Earth, confinement, and potential interpersonal conflicts, all complicated by circadian alterations. Medical risks including trauma must be considered. The role of such risk-modifying influences as artificial gravity and improved propulsion technologies to shorten round-trip time will also be discussed. Results of planning for assuring human health and performance will be presented.

  20. Advantages of a Modular Mars Surface Habitat Approach

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle A.; Hoffman, Stephan J.; Andrews, Alida; Watts, Kevin

    2018-01-01

    Early crewed Mars mission concepts developed by the National Aeronautics and Space Administration (NASA) assumed a single, large habitat would house six crew members for a 500-day Mars surface stay. At the end of the first mission, all surface equipment, including the habitat, -would be abandoned and the process would be repeated at a different Martian landing site. This work was documented in a series of NASA publications culminating with the Mars Design Reference Mission 5.0 (NASA-SP-2009-566). The Evolvable Mars Campaign (EMC) explored whether re-using surface equipment at a single landing site could be more affordable than the Apollo-style explore-abandon-repeat mission cadence. Initial EMC assumptions preserved the single, monolithic habitat, the only difference being a new requirement to reuse the surface habitat for multiple expedition crews. A trade study comparing a single large habitat versus smaller, modular habitats leaned towards the monolithic approach as more mass-efficient. More recent work has focused on the operational aspects of building up Mars surface infrastructure over multiple missions, and has identified compelling advantages of the modular approach that should be considered before making a final decision. This paper explores Mars surface mission operational concepts and integrated system analysis, and presents an argument for the modular habitat approach.

  1. Parametric Analysis for Aurora Mars Manned Mission Concept Definition

    NASA Astrophysics Data System (ADS)

    Augros, P.; Bonnefond, F.; Ranson, S.

    In the frame of the Aurora program (ESA program), Europe plans to get its own vision about future Mars manned mission. Within this context, we have performed an end-to-end analysis of what could be these missions, focusing on transportation aspects and mobile in-situ infrastructure. This paper will define what is needed to land on Mars, what is needed to return from Mars surface, will explore the round trip options and their consequences on the mission design and feasibility and will analyze the launcher issue and the in-orbit assembly scenarios. The main results enable to rediscover a candidate mission based on a scenario close to the NASA reference mission (Ref [1]). The main interest, from transportation point of view, is that the spacecraft are similar: same insertion stage, same descent vehicle. Such design can be possible with deployable aeroshield for Mars entry vehicle, in-situ water and propellant production, improved habitat technology, conjunction like round trip (minimum V avoiding science fiction design), a launcher payload capability of 100 tons in LEO with a payload size of 30 m long and 7.5 m diameter. An alternative, limiting also the overall mass in LEO, could be a no Mars infrastructure deployment and a single spacecraft going to Mars and returning back to Earth. But it implies for the crew to stay in Mars orbit several months, waiting for the next opportunity ensuring a minimum V.

  2. Manned Mars mission health maintenance facility

    NASA Technical Reports Server (NTRS)

    Degioanni, Joseph C.

    1986-01-01

    The Health Maintenance Facility (HMF) requirements which enable/enhance manned Mars missions (MMMs) are addressed. It does not attempt to resolve any issues that may affect the feasibility of any given element in the HMF. Reference is made to current work being conducted in the design of the space station HMF. The HMF requirements are discussed within the context of two distinctly different scenarios: HMF as part of the Mars surface infrastructure, and HMF as part of the nine months translation from low Earth orbit to Mars orbit. Requirements for an HMF are provided, and a concept of HMF is shown.

  3. Pioneering Objectives and Activities on the Surface of Mars

    NASA Technical Reports Server (NTRS)

    Toups, Larry; Hoffman, Stephen J.

    2015-01-01

    Human Mars missions have been a topic of sustained interest within NASA, which continues to use its resources to examine many different mission objectives, trajectories, vehicles, and technologies, the combinations of which are often referred to as reference missions or architectures. The current investigative effort, known as the Evolvable Mars Campaign (EMC), is examining alternatives that can pioneer an extended human presence on Mars that is Earth independent. These alternatives involve combinations of all the factors just mentioned. This paper is focused on the subset of these factors involved with objectives and activities that take place on the surface of Mars. "Pioneering" is a useful phrase to encapsulate the current approach being used to address this situation - one of its primary definitions is "a person or group that originates or helps open up a new line of thought or activity or a new method or technical development". Thus, in this scenario, NASA would be embarking on a path to "pioneer" a suite of technologies and operations that will result in an Earth independent, extended stay capability for humans on Mars. This paper will describe (a) the concept of operation determined to be best suited for the initial emplacement, (b) the functional capabilities determined to be necessary for this emplacement, with representative examples of systems that could carry out these functional capabilities and one implementation example (i.e., delivery sequence) at a representative landing site, and will (c) discuss possible capabilities and operations during subsequent surface missions.

  4. ExoMars Trace Gas Orbiter (TGO) Science Ground Segment (SGS)

    NASA Astrophysics Data System (ADS)

    Metcalfe, L.; Aberasturi, M.; Alonso, E.; Álvarez, R.; Ashman, M.; Barbarisi, I.; Brumfitt, J.; Cardesín, A.; Coia, D.; Costa, M.; Fernández, R.; Frew, D.; Gallegos, J.; García Beteta, J. J.; Geiger, B.; Heather, D.; Lim, T.; Martin, P.; Muñoz Crego, C.; Muñoz Fernandez, M.; Villacorta, A.; Svedhem, H.

    2018-06-01

    The ExoMars Trace Gas Orbiter (TGO) Science Ground Segment (SGS), comprised of payload Instrument Team, ESA and Russian operational centres, is responsible for planning the science operations of the TGO mission and for the generation and archiving of the scientific data products to levels meeting the scientific aims and criteria specified by the ESA Project Scientist as advised by the Science Working Team (SWT). The ExoMars SGS builds extensively upon tools and experience acquired through earlier ESA planetary missions like Mars and Venus Express, and Rosetta, but also is breaking ground in various respects toward the science operations of future missions like BepiColombo or JUICE. A productive interaction with the Russian partners in the mission facilitates broad and effective collaboration. This paper describes the global organisation and operation of the SGS, with reference to its principal systems, interfaces and operational processes.

  5. Evaluation of optical data for Mars approach navigation.

    NASA Technical Reports Server (NTRS)

    Jerath, N.

    1972-01-01

    Investigation of several optical data types which can be obtained from science and engineering instruments normally aboard interplanetary spacecraft. TV cameras are assumed to view planets or satellites and stars for celestial references. Also, spacecraft attitude sensors are assumed to yield celestial references. The investigation of approach phases of typical Mars missions showed that the navigation accuracy was greatly enhanced with the addition of optical data to radio data. Viewing stars and the planet Mars was found most advantageous ten days before Mars encounter, and viewing Deimos or Phobos and stars was most advantageous within ten days of encounter.

  6. Trades Between Opposition and Conjunction Class Trajectories for Early Human Missions to Mars

    NASA Technical Reports Server (NTRS)

    Mattfeld, Bryan; Stromgren, Chel; Shyface, Hilary; Komar, David R.; Cirillo, William; Goodliff, Kandyce

    2014-01-01

    Candidate human missions to Mars, including NASA's Design Reference Architecture 5.0, have focused on conjunction-class missions with long crewed durations and minimum energy trajectories to reduce total propellant requirements and total launch mass. However, in order to progressively reduce risk and gain experience in interplanetary mission operations, it may be desirable that initial human missions to Mars, whether to the surface or to Mars orbit, have shorter total crewed durations and minimal stay times at the destination. Opposition-class missions require larger total energy requirements relative to conjunction-class missions but offer the potential for much shorter mission durations, potentially reducing risk and overall systems performance requirements. This paper will present a detailed comparison of conjunction-class and opposition-class human missions to Mars vicinity with a focus on how such missions could be integrated into the initial phases of a Mars exploration campaign. The paper will present the results of a trade study that integrates trajectory/propellant analysis, element design, logistics and sparing analysis, and risk assessment to produce a comprehensive comparison of opposition and conjunction exploration mission constructs. Included in the trade study is an assessment of the risk to the crew and the trade offs between the mission duration and element, logistics, and spares mass. The analysis of the mission trade space was conducted using four simulation and analysis tools developed by NASA. Trajectory analyses for Mars destination missions were conducted using VISITOR (Versatile ImpulSive Interplanetary Trajectory OptimizeR), an in-house tool developed by NASA Langley Research Center. Architecture elements were evaluated using EXploration Architecture Model for IN-space and Earth-to-orbit (EXAMINE), a parametric modeling tool that generates exploration architectures through an integrated systems model. Logistics analysis was conducted using NASA's Human Exploration Logistics Model (HELM), and sparing allocation predictions were generated via the Exploration Maintainability Analysis Tool (EMAT), which is a probabilistic simulation engine that evaluates trades in spacecraft reliability and sparing requirements based on spacecraft system maintainability and reparability.

  7. Analysis of Shroud Options in Support of the Human Exploration of Mars

    NASA Technical Reports Server (NTRS)

    Feldman, Stuart; Borowski, Stanley; Engelund, Walter; Hundley, Jason; Monk, Timothy; Munk, Michelle

    2010-01-01

    In support of the Mars Design Reference Architecture (DRA) 5.0, the NASA study team analyzed several shroud options for use on the Ares V launch vehicle.1,2 These shroud options included conventional "large encapsulation" shrouds with outer diameters ranging from 8.4 to 12.9 meters (m) and overall lengths of 22.0 to 54.3 meters, along with a "nosecone-only" shroud option used for Mars transfer vehicle component delivery. Also examined was a "multi-use" aerodynamic encapsulation shroud used for launch, Mars aerocapture, and entry, descent, and landing of the cargo and habitat landers. All conventional shroud options assessed for use on the Mars launch vehicles were the standard biconic design derived from the reference shroud utilized in the Constellation Program s lunar campaign. It is the purpose of this paper to discuss the technical details of each of these shroud options including material properties, structural mass, etc., while also discussing both the volume and mass of the various space transportation and surface system payload elements required to support a "minimum launch" Mars mission strategy, as well as the synergy, potential differences and upgrade paths that may be required between the Lunar and Mars mission shrouds.

  8. Applications of Mars Global Reference Atmospheric Model (Mars-GRAM 2005) Supporting Mission Site Selection for Mars Science Laboratory

    NASA Technical Reports Server (NTRS)

    Justh, Hilary L.; Justus, Carl G.

    2008-01-01

    The Mars Global Reference Atmospheric Model (Mars-GRAM 2005) is an engineering level atmospheric model widely used for diverse mission applications. An overview is presented of Mars-GRAM 2005 and its new features. One new feature of Mars-GRAM 2005 is the 'auxiliary profile' option. In this option, an input file of temperature and density versus altitude is used to replace mean atmospheric values from Mars-GRAM's conventional (General Circulation Model) climatology. An auxiliary profile can be generated from any source of data or alternate model output. Auxiliary profiles for this study were produced from mesoscale model output (Southwest Research Institute's Mars Regional Atmospheric Modeling System (MRAMS) model and Oregon State University's Mars mesoscale model (MMM5)model) and a global Thermal Emission Spectrometer(TES) database. The global TES database has been specifically generated for purposes of making Mars-GRAM auxiliary profiles. This data base contains averages and standard deviations of temperature, density, and thermal wind components,averaged over 5-by-5 degree latitude-longitude bins and 15 degree L(s) bins, for each of three Mars years of TES nadir data. Results are presented using auxiliary profiles produced from the mesoscale model output and TES observed data for candidate Mars Science Laboratory (MSL) landing sites. Input parameters rpscale (for density perturbations) and rwscale (for wind perturbations) can be used to "recalibrate" Mars-GRAM perturbation magnitudes to better replicate observed or mesoscale model variability.

  9. Human Mars Mission Overview and Dust Storm Impacts on Site Selection

    NASA Astrophysics Data System (ADS)

    Hoffman, S. J.

    2017-06-01

    This presentation briefly reviews NASA's current approach to human exploration of Mars and key features placed on locations (referred to as Exploration Zones) for these activities. Impacts of dust and dust storms on selecting an EZ are discussed.

  10. Exploration Roadmap Working Group (ERWG) Data Collection, NASA's Inputs

    NASA Technical Reports Server (NTRS)

    Drake, Bret; Landis, Rob; Thomas, Andrew; Mauzy, Susan; Graham, Lee; Culbert, Chris; Troutman, Pat

    2010-01-01

    This slide presentation reviews four areas for further space exploration: (1) Human Exploration of Mars Design Reference Architecture (DRA) 5.0, (2) Robotic Precursors targeting Near Earth Objects (NEO) for Human Exploration, (3) Notional Human Exploration of Near Earth Objects and (4) Low Earth Orbit (LEO) Refueling to Augment Human Exploration. The first presentation reviews the goals and objectives of the Mars DRA, presents a possible mission profile, innovation requirements for the mission and key risks and challenges for human exploration of Mars. The second presentation reviews the objective and goals of the robotic precursors to the NEO and the mission profile of such robotic exploration. The third presentation reviews the mission scenario of human exploration of NEO, the objectives and goals, the mission operational drivers, the key technology needs and a mission profile. The fourth and last presentation reviews the examples of possible refueling in low earth orbit prior to lunar orbit insertion, to allow for larger delivered payloads for a lunar mission.

  11. Power Requirements for The NASA Mars Design Reference Architecture (DRA) 5.0

    NASA Technical Reports Server (NTRS)

    Cataldo, Robert L.

    2009-01-01

    This paper summarizes the power systems analysis results from NASA s recent Mars DRA 5.0 study which examined three architecture options and resulting mission requirements for a human Mars landing mission in the post-2030 timeframe. DRA 5.0 features a long approximately 500 day surface stay split mission using separate cargo and crewed Mars transfer vehicles. Two cargo flights, utilizing minimum energy trajectories, pre-deploy a cargo lander to the surface and a habitat lander into a 24-hour elliptical Mars parking orbit where it remains until the arrival of the crew during the next mission opportunity approximately 26 months later. The pre-deployment of cargo poses unique challenges for set-up and emplacement of surface assets that results in the need for self or robotically deployed designs. Three surface architecture options were evaluated for breadth of science content, extent of exploration range/capability and variations in system concepts and technology. This paper describes the power requirements for the surface operations of the three mission options, power system analyses including discussion of the nuclear fission, solar photovoltaic and radioisotope concepts for main base power and long range mobility.

  12. Mars Pathfinder Project: Planetary Constants and Models

    NASA Technical Reports Server (NTRS)

    Vaughan, Robin

    1995-01-01

    This document provides a common set of astrodynamic constants and planetary models for use by the Mars Pathfinder Project. It attempts to collect in a single reference all the quantities and models in use across the project during development and for mission operations. These models are central to the navigation and mission design functions, but they are also used in other aspects of the project such as science observation planning and data reduction.

  13. Human Mars Mission: Weights and Mass Properties. Pt. 1

    NASA Technical Reports Server (NTRS)

    Brothers, Bobby

    1999-01-01

    This paper presents a final report on The Human Mars Mission Weights and Measures. The topics included in this report are: 1) Trans-Earth Injection Storage Human Mars Mission (HMM) Chemical Design Reference Mission (DRM) v4.0a Weight Breakout; 2) Ascent Stage HMM Chemical DRM v4.0a Weight Breakout; 3) Descent Stages HMM Chemical DRM v4.0a Weight Breakout; 4) Trans-Mars Injection Stages HMM Chemical DRM v4.0a Weight Breakout; 5) Trans-Earth Injection Stage HMM Solar Electric Propulsion (SEP) DRM v4.0a Weight Breakout; 6) Ascent Stage HMM SEP DRM v4.0a Weight Breakout; 7) Descent Stages HMM SEP DRM v4.0a Weight Breakout; 8) Trans-Mars Injection Stages HMM SEP DRM v4.0a Weight Breakout; 9) Crew Taxi Stage HMM SEP DRM v4.0 Weight Breakout; 10)Trans-Earth Injection Stage HMM Nuclear DRM v4.0a Weight Breakout; 11) Ascent Stage HMM Nuclear DRM v4.0a Weight Breakout; 12) Descent Stages HMM Nuclear DRM v4.0a Weight Breakout; 13) Trans-Mars Injection Stages HMM Nuclear DRM v4.0a Weight Breakout; and 14) HMM Mass Properties Coordinate System.

  14. Design of human missions to Mars and robotic missions to Jupiter

    NASA Astrophysics Data System (ADS)

    Okutsu, Masataka

    We consider human missions to Mars and robotic missions to Jupiter for launch dates in the near- and far-future. For the near-future, we design trajectories for currently proposed space missions that have well-defined spacecraft and mission requirements. For example, for early human missions to Mars we assume that the constraints used in NASA's design reference missions are indicative of current and near-future technologies, which of course limit our capabilities to explore Mars--and these limits make the problem challenging. Similarly, in the case of robotic exploration of Jupiter, we consider that the technology levels assumed for the proposed Europa Orbiter mission represent reasonable limits. For the far-future (two to three decades from now), we take the best estimates from current literature about the capabilities that may be available in nuclear-powered electric propulsion. We consider hardware capabilities (in terms of specific mass, specific impulse, thrust, power, etc.) for low-thrust trajectories, which range froth near-term to far-future technologies. In designing such missions, several techniques are found useful. For example, the Tisserand Graph, which tracks the changes in orbital shapes and energies, provides insight in designing Jovian tours for the Europa Orbiter mission. The graph is also useful in analyzing abort trajectories for human missions to Mars. Furthermore, a patched-conic propagator, which can generate thousands of potential trajectories, plays a vital role in three of four chapters of this thesis. For launches in the next three decades, we discovered a class of Earth- Mars-Venus-Earth free returns (which appear only four times in the 100-year period), Jovian tours involving ten to twenty flybys of the Galilean satellites, and low-thrust trajectories to Jupiter via gravity assists from Venus, Earth, and Mars. In addition, our continuation method, in which a solution for a conic trajectory is gradually converted into that for a low- thrust trajectory, is found effective in design of some families of low-thrust trajectories. The method is applied, for example, in the design of a "one- vehicle cycler," an architecture requiring only one interplanetary vehicle for sustained human missions to Mars.

  15. Mission and space vehicle sizing data for a chemical propulsion/aerobraking option

    NASA Technical Reports Server (NTRS)

    Butler, John; Brothers, Bobby

    1986-01-01

    Sizing data is presented for various combinations of Mars missions and chemical-propulsion/aerobraking vehicles. Data is compared for vehicles utilizing opposition (2-year mission) and conjunction (3-year mission) trajectories for 1999 and 2001 opportunities, for various sizes of vehicles. Payload capabilities for manned and unmanned missions vehicles and for propulsive-braking and aerobraking cases are shown. The effect of scaling up a reference vehicle is compared to the case of utilizing two identical vehicles, for growth in payload capability. The rate of cumulative build up of weight on the surface of Mars is examined for various mission/vehicle combinations, and is compared to the landed-weight requirements for sortie missions, moving-base missions, and fixed-base missions. Also, the required buildup of weight in low Earth orbit (LEO) for various mission/vehicle combinations is presented and discussed.

  16. Design Concept for a Minimal Volume Spacecraft Cabin to Serve as a Mars Ascent Vehicle Cabin and Other Alternative Pressurized Vehicle Cabins

    NASA Technical Reports Server (NTRS)

    Howard, Robert L., Jr.

    2016-01-01

    The Evolvable Mars Campaign is developing concepts for human missions to the surface of Mars. These missions are round-trip expeditions, thereby requiring crew launch via a Mars Ascent Vehicle (MAV). A study to identify the smallest possible pressurized cabin for this mission has developed a conceptual vehicle referred to as the minimal MAV cabin. The origin of this concept will be discussed as well as its initial concept definition. This will lead to a description of possible configurations to integrate the minimal MAV cabin with ascent vehicle engines and propellant tanks. Limitations of this concept will be discussed, in particular those that argue against the use of the minimal MAV cabin to perform the MAV mission. However, several potential alternative uses for the cabin are identified. Finally, recommended forward work will be discussed, including current work in progress to develop a full scale mockup and conduct usability evaluations.

  17. Robotic Mars Sample Return: Risk Assessment and Analysis Report

    NASA Technical Reports Server (NTRS)

    Lalk, Thomas R.; Spence, Cliff A.

    2003-01-01

    A comparison of the risk associated with two alternative scenarios for a robotic Mars sample return mission was conducted. Two alternative mission scenarios were identified, the Jet Propulsion Lab (JPL) reference Mission and a mission proposed by Johnson Space Center (JSC). The JPL mission was characterized by two landers and an orbiter, and a Mars orbit rendezvous to retrieve the samples. The JSC mission (Direct/SEP) involves a solar electric propulsion (SEP) return to earth followed by a rendezvous with the space shuttle in earth orbit. A qualitative risk assessment to identify and characterize the risks, and a risk analysis to quantify the risks were conducted on these missions. Technical descriptions of the competing scenarios were developed in conjunction with NASA engineers and the sequence of events for each candidate mission was developed. Risk distributions associated with individual and combinations of events were consolidated using event tree analysis in conjunction with Monte Carlo techniques to develop probabilities of mission success for each of the various alternatives. The results were the probability of success of various end states for each candidate scenario. These end states ranged from complete success through various levels of partial success to complete failure. Overall probability of success for the Direct/SEP mission was determined to be 66% for the return of at least one sample and 58% for the JPL mission for the return of at least one sample cache. Values were also determined for intermediate events and end states as well as for the probability of violation of planetary protection. Overall mission planetary protection event probabilities of occurrence were determined to be 0.002% and 1.3% for the Direct/SEP and JPL Reference missions respectively.

  18. In-situ Production of High Density Polyethylene and Other Useful Materials on Mars

    NASA Technical Reports Server (NTRS)

    Flynn, Michael

    2005-01-01

    This paper describes a revolutionary materials structure and power storage concept based on the in-situ production of abiotic carbon 4 compounds. One of the largest single mass penalties required to support the human exploration of Mars is the surface habitat. This proposal will use physical chemical technologies to produce high density polyethylene (HDPE) inflatable structures and construction materials from Mars atmospheric CO2. The formation of polyethylene from Mars CO2 is based on the use of the Sabatier and modified Fischer Tropsch reactions. The proposed system will fully integrate with existing in-situ propellant production concepts. The technology will also be capable of supplementing human caloric requirements, providing solid and liquid fuels for energy storage, and providing significant reduction in mission risk. The NASA Mars Reference Mission Definition Team estimated that a conventional Mars surface habitat structure would weigh 10 tonnes. It is estimated that this technology could reduce this mass by 80%. This reduction in mass will significantly contribute to the reduction in total mission cost need to make a Mars mission a reality. In addition the potential reduction of risk provided by the ability to produce C4 and potentially higher carbon based materials in-situ on Mars is significant. Food, fuel, and shelter are only three of many requirements that would be impacted by this research.

  19. Human Exploration of Phobos

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew F. J.; Chappell, Steven P.; Gernhardt, Michael L.; Lee, David E.; Howe, A. Scott

    2015-01-01

    This study developed, analyzed, and compared mission architectures for human exploration of Mars' Moons within the context of an Evolvable Mars Campaign. METHODS: All trades assumed conjunction class missions to Phobos (approximately 500 days in Mars system) as it was considered the driving case for the transportation architecture. All architectures assumed that the Mars Transit Habitat would remain in a High Mars Orbit with crewmembers transferring between HMO and Phobos in a small crew taxi vehicle. A reference science / exploration program was developed including performance of a standard set of tasks at 55 locations on the Phobos surface. Detailed EVA timelines were developed using realistic flight rules to accomplish the reference science tasks using exploration systems ranging from jetpacks to multi-person pressurized excursion vehicles combined with Phobos surface and orbital (L1, L4/L5, 20km Distant Retrograde Orbit) habitat options. Detailed models of propellant mass, crew time, science productivity, radiation exposure, systems and consumables masses, and other figures of merit were integrated to enable quantitative comparison of different architectural options. Options for pre-staging assets using solar electric propulsion (SEP) vs. delivering all systems with the crew were also evaluated. Seven discrete mission architectures were evaluated. RESULTS: The driving consideration for habitat location (Phobos surface vs. orbital) was radiation exposure, with an estimated reduction in cumulative mission radiation exposure of up to 34% (vs. Mars orbital mission) when the habitat is located on the Phobos surface, compared with only 3-6% reduction for a habitat in a 20km DRO. The exploration utility of lightweight unpressurized excursion vehicles was limited by the need to remain within 20 minutes of Solar Particle Event radiation protection combined with complex GN&C systems required by the non-intuitive and highly-variable gravitational environment. Two-person pressurized excursion vehicles as well as mobile surface habitats offer significant exploration capability and operational benefits compared with unpressurized EVA mobility systems at the cost of increased system and propellant mass. Mechanical surface translation modes (i.e. hopping) were modeled and offer potentially significant propellant savings and the possibility of extended exploration operations between crewed missions. Options for extending the utilization of the crew taxi vehicle were examined, including use as an exploration asset for Phobos surface exploration (when combined with an alternate mobility system) and as an EVA platform, both on Phobos and for contingency EVA on the Mars Transit Habitat. CONCLUSIONS: Human exploration of Phobos offers a scientifically meaningful first step towards human Mars surface missions that develops and validates transportation, habitation, and exploration systems and operations in advance of the Mars landing systems.

  20. Utilizing Mars Global Reference Atmospheric Model (Mars-GRAM 2005) to Evaluate Entry Probe Mission Sites

    NASA Technical Reports Server (NTRS)

    Justh, Hilary L.; Justus, C. G.

    2008-01-01

    Engineering-level atmospheric model widely used for diverse mission applications. Mars-GRAM s perturbation modeling capability is commonly used, in a Monte-Carlo mode, to perform high fidelity engineering end-to-end simulations for entry, descent, and landing (EDL)1. Traditional Mars-GRAM options for representing the mean atmosphere along entry corridors include: a) TES Mapping Years 1 and 2, with Mars-GRAM data coming from MGCM model results driven by observed TES dust optical depth; and b) TES Mapping Year 0, with user-controlled dust optical depth and Mars-GRAM data interpolated from MGCM model results driven by selected values of globally-uniform dust optical depth. From the surface to 80 km altitude, Mars-GRAM is based on NASA Ames Mars General Circulation Model (MGCM). Mars-GRAM and MGCM use surface topography from Mars Global Surveyor Mars Orbiter Laser Altimeter (MOLA), with altitudes referenced to the MOLA areoid, or constant potential surface. Mars-GRAM 2005 has been validated2 against Radio Science data, and both nadir and limb data from the Thermal Emission Spectrometer (TES)

  1. An Efficient Approach for Mars Sample Return Using Emerging Commercial Capabilities

    NASA Technical Reports Server (NTRS)

    Gonzales, Andrew A.; Stoker, Carol R.

    2016-01-01

    Mars Sample Return is the highest priority science mission for the next decade as recommended by the 2011 Decadal Survey of Planetary Science. This article presents the results of a feasibility study for a Mars Sample Return mission that efficiently uses emerging commercial capabilities expected to be available in the near future. The motivation of our study was the recognition that emerging commercial capabilities might be used to perform Mars Sample Return with an Earth-direct architecture, and that this may offer a desirable simpler and lower cost approach. The objective of the study was to determine whether these capabilities can be used to optimize the number of mission systems and launches required to return the samples, with the goal of achieving the desired simplicity. All of the major element required for the Mars Sample Return mission are described. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships. The analysis shows the feasibility of a complete and closed Mars Sample Return mission design based on the following scenario: A SpaceX Falcon Heavy launch vehicle places a modified version of a SpaceX Dragon capsule, referred to as "Red Dragon", onto a Trans Mars Injection trajectory. The capsule carries all the hardware needed to return to Earth Orbit samples collected by a prior mission, such as the planned NASA Mars 2020 sample collection rover. The payload includes a fully fueled Mars Ascent Vehicle; a fueled Earth Return Vehicle, support equipment, and a mechanism to transfer samples from the sample cache system onboard the rover to the Earth Return Vehicle. The Red Dragon descends to land on the surface of Mars using Supersonic Retropropulsion. After collected samples are transferred to the Earth Return Vehicle, the single-stage Mars Ascent Vehicle launches the Earth Return Vehicle from the surface of Mars to a Mars phasing orbit. After a brief phasing period, the Earth Return Vehicle performs a Trans Earth Injection burn. Once near Earth, the Earth Return Vehicle performs Earth and lunar swing-bys and is placed into a Lunar Trailing Orbit - an Earth orbit, at lunar distance. A retrieval mission then performs a rendezvous with the Earth Return Vehicle, retrieves the sample container, and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft makes a controlled Earth re-entry preventing any unintended release of Martian materials into the Earth's biosphere. The mission can start in any one of three Earth to Mars launch opportunities, beginning in 2022.

  2. Analysis of a spacecraft life support system for a Mars mission.

    PubMed

    Czupalla, M; Aponte, V; Chappell, S; Klaus, D

    2004-01-01

    This report summarizes a trade study conducted as part of the Fall 2002 semester Spacecraft Life Support System Design course (ASEN 5116) in the Aerospace Engineering Sciences Department at the University of Colorado. It presents an analysis of current life support system technologies and a preliminary design of an integrated system for supporting humans during transit to and on the surface of the planet Mars. This effort was based on the NASA Design Reference Mission (DRM) for the human exploration of Mars [NASA Design Reference Mission (DRM) for Mars, Addendum 3.0, from the world wide web: http://exploration.jsc.nasa.gov/marsref/contents.html.]. The integrated design was broken into four subsystems: Water Management, Atmosphere Management, Waste Processing, and Food Supply. The process started with the derivation of top-level requirements from the DRM. Additional system and subsystem level assumptions were added where clarification was needed. Candidate technologies were identified and characterized based on performance factors. Trade studies were then conducted for each subsystem. The resulting technologies were integrated into an overall design solution using mass flow relationships. The system level trade study yielded two different configurations--one for the transit to Mars and another for the surface habitat, which included in situ resource utilization. Equivalent System Mass analyses were used to compare each design against an open-loop (non-regenerable) baseline system. c2003 International Astronautical Federation. Published by Elsevier Ltd. All rights reserved.

  3. Solar Electric Propulsion for Mars Exploration

    NASA Technical Reports Server (NTRS)

    Hack, Kurt J.

    1998-01-01

    Highly propellant-efficient electric propulsion is being combined with advanced solar power technology to provide a non-nuclear transportation option for the human exploration of Mars. By virtue of its high specific impulse, electric propulsion offers a greater change in spacecraft velocity for each pound of propellant than do conventional chemical rockets. As a result, a mission to Mars based on solar electric propulsion (SEP) would require fewer heavy-lift launches than a traditional all-chemical space propulsion scenario would. Performance, as measured by mass to orbit and trip time, would be comparable to the NASA design reference mission for human Mars exploration, which utilizes nuclear thermal propulsion; but it would avoid the issues surrounding the use of nuclear reactors in space.

  4. New Directions in Space: A Report on the Lunar and Mars Initiatives

    NASA Technical Reports Server (NTRS)

    Seitz, Frederick; Hawkins, Willis; Jastrow, Robert; Nierenberg, William A.

    1990-01-01

    This report focuses on one aspect of the current space program: The establishment of a manned base on the Moon and the manned exploration of Mars. These missions were announced by the President last year as a major U.S. space policy objective to be implemented under the leadership of the Vice President, acting as Chairman of the National Space Council. On March 8, 1990, the White House released Presidential guidelines for the execution of the lunar and Mars programs. The guidelines stressed the need for new approaches and the development of innovative technologies with a potential for major cost, schedule and performance improvements. They also called for a competitive environment, with several years allotted to the definition of at least two significantly different human space exploration "reference architectures." Selection of the final technical concepts for the mission is scheduled to occur only after the relative merits of the competing reference architectures have been evaluated.

  5. Mars exploration study workshop 2

    NASA Astrophysics Data System (ADS)

    Duke, Michael B.; Budden, Nancy Ann

    1993-11-01

    A year-long NASA-wide study effort has led to the development of an innovative strategy for the human exploration of Mars. The latest Mars Exploration Study Workshop 2 advanced a design reference mission (DRM) that significantly reduces the perceived high costs, complex infrastructure, and long schedules associated with previous Mars scenarios. This surface-oriented philosophy emphasizes the development of high-leveraging surface technologies in lieu of concentrating exclusively on space transportation technologies and development strategies. As a result of the DRM's balanced approach to mission and crew risk, element commonality, and technology development, human missions to Mars can be accomplished without the need for complex assembly operations in low-Earth orbit. This report, which summarizes the Mars Exploration Study Workshop held at the Ames Research Center on May 24-25, 1993, provides an overview of the status of the Mars Exploration Study, material presented at the workshop, and discussions of open items being addressed by the study team. The workshop assembled three teams of experts to discuss cost, dual-use technology, and international involvement, and to generate a working group white paper addressing these issues. The three position papers which were generated are included in section three of this publication.

  6. Mars exploration study workshop 2

    NASA Technical Reports Server (NTRS)

    Duke, Michael B.; Budden, Nancy Ann

    1993-01-01

    A year-long NASA-wide study effort has led to the development of an innovative strategy for the human exploration of Mars. The latest Mars Exploration Study Workshop 2 advanced a design reference mission (DRM) that significantly reduces the perceived high costs, complex infrastructure, and long schedules associated with previous Mars scenarios. This surface-oriented philosophy emphasizes the development of high-leveraging surface technologies in lieu of concentrating exclusively on space transportation technologies and development strategies. As a result of the DRM's balanced approach to mission and crew risk, element commonality, and technology development, human missions to Mars can be accomplished without the need for complex assembly operations in low-Earth orbit. This report, which summarizes the Mars Exploration Study Workshop held at the Ames Research Center on May 24-25, 1993, provides an overview of the status of the Mars Exploration Study, material presented at the workshop, and discussions of open items being addressed by the study team. The workshop assembled three teams of experts to discuss cost, dual-use technology, and international involvement, and to generate a working group white paper addressing these issues. The three position papers which were generated are included in section three of this publication.

  7. Autonomous optical navigation using nanosatellite-class instruments: a Mars approach case study

    NASA Astrophysics Data System (ADS)

    Enright, John; Jovanovic, Ilija; Kazemi, Laila; Zhang, Harry; Dzamba, Tom

    2018-02-01

    This paper examines the effectiveness of small star trackers for orbital estimation. Autonomous optical navigation has been used for some time to provide local estimates of orbital parameters during close approach to celestial bodies. These techniques have been used extensively on spacecraft dating back to the Voyager missions, but often rely on long exposures and large instrument apertures. Using a hyperbolic Mars approach as a reference mission, we present an EKF-based navigation filter suitable for nanosatellite missions. Observations of Mars and its moons allow the estimator to correct initial errors in both position and velocity. Our results show that nanosatellite-class star trackers can produce good quality navigation solutions with low position (<300 {m}) and velocity (<0.15 {m/s}) errors as the spacecraft approaches periapse.

  8. Destination Deimos: A Design Reference Architecture for Initial Human Exploration of the Mars System

    NASA Technical Reports Server (NTRS)

    Logan, James S.; Adamo, D. R.

    2011-01-01

    The two biggest challenges to successful human operations in interplanetary space are flight dynamics, constrained by the cold hard physics of the rocket equation, and bioastronautics, the psychophysiological realities of human adaptation, or lack thereof, to the deep space environment. Without substantial innovation in project/mission architecture and vehicle design, human exploration of the Mars system could be problematic for decades. Although a human landing on Mars is inevitable, humans-in-the-loop telerobotic exploration from the outer Martian moon Deimos is the best way to begin. Precursor robotic missions for reconnaissance and local site preparation will be required.

  9. MW-Class Electric Propulsion System Designs for Mars Cargo Transport

    NASA Technical Reports Server (NTRS)

    Gilland, James H.; LaPointe, Michael R.; Oleson, Steven; Mercer, Carolyn; Pencil, Eric; Maosn, Lee

    2011-01-01

    Multi-kilowatt electric propulsion systems are well developed and have been used on commercial and military satellites in Earth orbit for several years. Ion and Hall thrusters have also propelled robotic spacecraft to encounters with asteroids, the Moon, and minor planetary bodies within the solar system. High power electric propulsion systems are currently being considered to support piloted missions to near earth asteroids, as cargo transport for sustained lunar or Mars exploration, and for very high-power piloted missions to Mars and the outer planets. Using NASA Mars Design Architecture 5.0 as a reference, a preliminary parametric analysis was performed to determine the suitability of a nuclear powered, MW-class electric propulsion system for Mars cargo transport. For this initial analysis, high power 100-kW Hall thrusters and 250-kW VASIMR engines were separately evaluated to determine optimum vehicle architecture and estimated performance. The DRA 5.0 cargo mission closed for both propulsion options, delivering a 100 t payload to Mars orbit and reducing the number of heavy lift launch vehicles from five in the baseline DRA 5.0 architecture to two using electric propulsion. Under an imposed single engine-out mission success criteria, the VASIMR system took longer to reach Mars than did the Hall system, arising from the need to operate the VASIMR thrusters in pairs during the spiral out from low Earth orbit.

  10. Catalog of lunar and Mars science payloads

    NASA Technical Reports Server (NTRS)

    Budden, Nancy Ann (Editor)

    1994-01-01

    This catalog collects and describes science payloads considered for future robotic and human exploration missions to the Moon and Mars. The science disciplines included are geosciences, meteorology, space physics, astronomy and astrophysics, life sciences, in-situ resource utilization, and robotic science. Science payload data is helpful for mission scientists and engineers developing reference architectures and detailed descriptions of mission organizations. One early step in advanced planning is formulating the science questions for each mission and identifying the instrumentation required to address these questions. The next critical element is to establish and quantify the supporting infrastructure required to deliver, emplace, operate, and maintain the science experiments with human crews or robots. This requires a comprehensive collection of up-to-date science payload information--hence the birth of this catalog. Divided into lunar and Mars sections, the catalog describes the physical characteristics of science instruments in terms of mass, volume, power and data requirements, mode of deployment and operation, maintenance needs, and technological readiness. It includes descriptions of science payloads for specific missions that have been studied in the last two years: the Scout Program, the Artemis Program, the First Lunar Outpost, and the Mars Exploration Program.

  11. SolSTUS: Solar Source Thermal Upper Stage

    NASA Astrophysics Data System (ADS)

    This paper was written by members of the Utah State University (USU) Space Systems Design class, fall quarter 1993. The class is funded by NASA and administered by the University Space Research Association (USRA). The focus of the class is to give students some experience in design of space systems and as a source of original ideas for NASA. This paper is a summary of the work done by members of the Space Systems Design class during the opening phase of the course. The class was divided into groups to work on different areas of the Solar Thermal Rocket (STR) booster in order to produce a design reference mission that would identify the key design issues. The design reference mission focused upon a small satellite mission to Mars. There are several critical components in a Solar Thermal Rocket. STR's produce a very low thrust, but have a high specific impulse, meaning that they take longer to reach the desired orbit, but use a lot less fuel in doing it. The complexity of the rocket is discussed in this paper. Some of the more critical design problems discussed are: (1) the structural and optical complexity of collecting and focusing sunlight onto a specific point, (2) long term storage of fuel (liquid hydrogen), (3) attitude control while thrusting in an elliptical orbit and orienting the mirrors to collect sunlight, and (4) power and communications for the rocket and it's internal systems. The design reference mission discussed here is a very general mission to Mars. A first order trajectory design has been done and a possible basic science payload for Mars has been suggested. This paper summarizes the design reference mission (DRM) formulated by the USU students during fall quarter and identifies major design challenges that will confront the design team during the next two quarters here at USU.

  12. SolSTUS: Solar Source Thermal Upper Stage

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This paper was written by members of the Utah State University (USU) Space Systems Design class, fall quarter 1993. The class is funded by NASA and administered by the University Space Research Association (USRA). The focus of the class is to give students some experience in design of space systems and as a source of original ideas for NASA. This paper is a summary of the work done by members of the Space Systems Design class during the opening phase of the course. The class was divided into groups to work on different areas of the Solar Thermal Rocket (STR) booster in order to produce a design reference mission that would identify the key design issues. The design reference mission focused upon a small satellite mission to Mars. There are several critical components in a Solar Thermal Rocket. STR's produce a very low thrust, but have a high specific impulse, meaning that they take longer to reach the desired orbit, but use a lot less fuel in doing it. The complexity of the rocket is discussed in this paper. Some of the more critical design problems discussed are: (1) the structural and optical complexity of collecting and focusing sunlight onto a specific point, (2) long term storage of fuel (liquid hydrogen), (3) attitude control while thrusting in an elliptical orbit and orienting the mirrors to collect sunlight, and (4) power and communications for the rocket and it's internal systems. The design reference mission discussed here is a very general mission to Mars. A first order trajectory design has been done and a possible basic science payload for Mars has been suggested. This paper summarizes the design reference mission (DRM) formulated by the USU students during fall quarter and identifies major design challenges that will confront the design team during the next two quarters here at USU.

  13. Performance Testing of Yardney Li-Ion Cells and Batteries in Support of Future NASA Missions

    NASA Technical Reports Server (NTRS)

    Smart, M. C.; Ratnakumar, B. V.; Whitcanack, L. D.; Puglia, F. J.; Santee, S.; Gitzendanner, R.

    2009-01-01

    NASA requires lightweight rechargeable batteries for future missions to Mars and the outer planets that are capable of operating over a wide range of temperatures, with high specific energy and energy densities. Due to the attractive performance characteristics, Li-ion batteries have been identified as the battery chemistry of choice for a number of future applications. For example, JPL is planning to launch another unmanned rover mission to the planet Mars. This mission, referred to as the Mars Science Laboratory (MSL), will involve the use of a rover that is much larger than the previously developed Spirit and Opportunity Rovers for the 2003 Mars Exploration Rover (MER) mission, that are currently still in operation on the surface of the planet after more than five years. Part of the reason that the MER rovers have operated so successfully, far exceeding the required mission duration of 90 sols, is that they possess robust Li-ion batteries, manufactured by Yardney Technical Products, which have demonstrated excellent life characteristics. Given the excellent performance characteristics displayed, similar Li-ion batteries have been projected to successfully meet the mission requirements of the up-coming MSL mission. In addition to future missions to Mars, Li-ion technology is attractive for a number of other future NASA applications which require high specific energy, rechargeable batteries. To ascertain the viability of using Li-ion batteries for these applications, a number of performance validation tests have been performed on both Yardney cells and batteries of various sizes. These tests include mission simulation tests, charge and discharge rate characterization testing, cycle life testing under various conditions, and storage testing.

  14. An efficient approach for Mars Sample Return using emerging commercial capabilities

    NASA Astrophysics Data System (ADS)

    Gonzales, Andrew A.; Stoker, Carol R.

    2016-06-01

    Mars Sample Return is the highest priority science mission for the next decade as recommended by the 2011 Decadal Survey of Planetary Science (Squyres, 2011 [1]). This article presents the results of a feasibility study for a Mars Sample Return mission that efficiently uses emerging commercial capabilities expected to be available in the near future. The motivation of our study was the recognition that emerging commercial capabilities might be used to perform Mars Sample Return with an Earth-direct architecture, and that this may offer a desirable simpler and lower cost approach. The objective of the study was to determine whether these capabilities can be used to optimize the number of mission systems and launches required to return the samples, with the goal of achieving the desired simplicity. All of the major element required for the Mars Sample Return mission are described. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships. The analysis shows the feasibility of a complete and closed Mars Sample Return mission design based on the following scenario: A SpaceX Falcon Heavy launch vehicle places a modified version of a SpaceX Dragon capsule, referred to as ;Red Dragon;, onto a Trans Mars Injection trajectory. The capsule carries all the hardware needed to return to Earth Orbit samples collected by a prior mission, such as the planned NASA Mars 2020 sample collection rover. The payload includes a fully fueled Mars Ascent Vehicle; a fueled Earth Return Vehicle, support equipment, and a mechanism to transfer samples from the sample cache system onboard the rover to the Earth Return Vehicle. The Red Dragon descends to land on the surface of Mars using Supersonic Retropropulsion. After collected samples are transferred to the Earth Return Vehicle, the single-stage Mars Ascent Vehicle launches the Earth Return Vehicle from the surface of Mars to a Mars phasing orbit. After a brief phasing period, the Earth Return Vehicle performs a Trans Earth Injection burn. Once near Earth, the Earth Return Vehicle performs Earth and lunar swing-bys and is placed into a Lunar Trailing Orbit-an Earth orbit, at lunar distance. A retrieval mission then performs a rendezvous with the Earth Return Vehicle, retrieves the sample container, and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft makes a controlled Earth re-entry preventing any unintended release of Martian materials into the Earth's biosphere. The mission can start in any one of three Earth to Mars launch opportunities, beginning in 2022.

  15. An Efficient Approach for Mars Sample Return Using Emerging Commercial Capabilities.

    PubMed

    Gonzales, Andrew A; Stoker, Carol R

    2016-06-01

    Mars Sample Return is the highest priority science mission for the next decade as recommended by the 2011 Decadal Survey of Planetary Science [1]. This article presents the results of a feasibility study for a Mars Sample Return mission that efficiently uses emerging commercial capabilities expected to be available in the near future. The motivation of our study was the recognition that emerging commercial capabilities might be used to perform Mars Sample Return with an Earth-direct architecture, and that this may offer a desirable simpler and lower cost approach. The objective of the study was to determine whether these capabilities can be used to optimize the number of mission systems and launches required to return the samples, with the goal of achieving the desired simplicity. All of the major element required for the Mars Sample Return mission are described. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships. The analysis shows the feasibility of a complete and closed Mars Sample Return mission design based on the following scenario: A SpaceX Falcon Heavy launch vehicle places a modified version of a SpaceX Dragon capsule, referred to as "Red Dragon", onto a Trans Mars Injection trajectory. The capsule carries all the hardware needed to return to Earth Orbit samples collected by a prior mission, such as the planned NASA Mars 2020 sample collection rover. The payload includes a fully fueled Mars Ascent Vehicle; a fueled Earth Return Vehicle, support equipment, and a mechanism to transfer samples from the sample cache system onboard the rover to the Earth Return Vehicle. The Red Dragon descends to land on the surface of Mars using Supersonic Retropropulsion. After collected samples are transferred to the Earth Return Vehicle, the single-stage Mars Ascent Vehicle launches the Earth Return Vehicle from the surface of Mars to a Mars phasing orbit. After a brief phasing period, the Earth Return Vehicle performs a Trans Earth Injection burn. Once near Earth, the Earth Return Vehicle performs Earth and lunar swing-bys and is placed into a Lunar Trailing Orbit - an Earth orbit, at lunar distance. A retrieval mission then performs a rendezvous with the Earth Return Vehicle, retrieves the sample container, and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft makes a controlled Earth re-entry preventing any unintended release of Martian materials into the Earth's biosphere. The mission can start in any one of three Earth to Mars launch opportunities, beginning in 2022.

  16. An Efficient Approach for Mars Sample Return Using Emerging Commercial Capabilities

    PubMed Central

    Gonzales, Andrew A.; Stoker, Carol R.

    2016-01-01

    Mars Sample Return is the highest priority science mission for the next decade as recommended by the 2011 Decadal Survey of Planetary Science [1]. This article presents the results of a feasibility study for a Mars Sample Return mission that efficiently uses emerging commercial capabilities expected to be available in the near future. The motivation of our study was the recognition that emerging commercial capabilities might be used to perform Mars Sample Return with an Earth-direct architecture, and that this may offer a desirable simpler and lower cost approach. The objective of the study was to determine whether these capabilities can be used to optimize the number of mission systems and launches required to return the samples, with the goal of achieving the desired simplicity. All of the major element required for the Mars Sample Return mission are described. Mission system elements were analyzed with either direct techniques or by using parametric mass estimating relationships. The analysis shows the feasibility of a complete and closed Mars Sample Return mission design based on the following scenario: A SpaceX Falcon Heavy launch vehicle places a modified version of a SpaceX Dragon capsule, referred to as “Red Dragon”, onto a Trans Mars Injection trajectory. The capsule carries all the hardware needed to return to Earth Orbit samples collected by a prior mission, such as the planned NASA Mars 2020 sample collection rover. The payload includes a fully fueled Mars Ascent Vehicle; a fueled Earth Return Vehicle, support equipment, and a mechanism to transfer samples from the sample cache system onboard the rover to the Earth Return Vehicle. The Red Dragon descends to land on the surface of Mars using Supersonic Retropropulsion. After collected samples are transferred to the Earth Return Vehicle, the single-stage Mars Ascent Vehicle launches the Earth Return Vehicle from the surface of Mars to a Mars phasing orbit. After a brief phasing period, the Earth Return Vehicle performs a Trans Earth Injection burn. Once near Earth, the Earth Return Vehicle performs Earth and lunar swing-bys and is placed into a Lunar Trailing Orbit - an Earth orbit, at lunar distance. A retrieval mission then performs a rendezvous with the Earth Return Vehicle, retrieves the sample container, and breaks the chain of contact with Mars by transferring the sample into a sterile and secure container. With the sample contained, the retrieving spacecraft makes a controlled Earth re-entry preventing any unintended release of Martian materials into the Earth’s biosphere. The mission can start in any one of three Earth to Mars launch opportunities, beginning in 2022. PMID:27642199

  17. Crew Health and Performance on Mars

    NASA Technical Reports Server (NTRS)

    Stegemoeller, Charlie

    1998-01-01

    The issues surrounding the health and performance on Mars of a human crew are discussed in this presentation. The work of Human Space Life Sciences Program Office (HSLSPO) in the preparation of a crew for a Martian mission is reviewed. This includes a review of issues relating to human health and performance (HHP) in space and microgravity. The Mars design reference mission requires the most rigorous life sciences critical path of any manned mission in the forseeable future. This mission will require a 30 months round trip, with 4 different transistions to different gravities, and two episodes of high gravity load, during the Mars and Earth Aerobraking exercises. A graph is presented which shows the number of subjects with human space flight experience greater than 30 days. A chart presents the physical challenges to HHP in terms of gravity and acceleration and the length of times the crew will be exposed to the various gravity loads. Another chart presents the radiation challenges to the HHP for the duration of the trip. The human element is the most complex element of the mission design. Some challenges (i.e., human engineering and life support) must be overcome, and some issues such as bone loss, and radiation exposure must be addressed prior to making a decision for a manned Martian mission.

  18. Design Study for a Mars Geyser Hopper

    NASA Technical Reports Server (NTRS)

    Landis, Geoffrey A.; Oleson, Steven J.; McGuire, Melissa

    2012-01-01

    The Mars Geyser Hopper is a design reference missions (DRMs) for a Discovery-class spacecraft using Advanced Stirling Radioisotope Generator (ASRG) power source. The Geyser Hopper is a mission concept that will investigate the springtime carbon-dioxide geysers found in regions around the south pole of Mars. The Geyser Hopper design uses Phoenix heritage systems and approach, but uses a single ASRG as the power source, rather than twin solar arrays, and is designed to last over a one-year stay on the South Pole. The spacecraft will land at a target landing area near the south pole of Mars, and have the ability to "hop" after a summertime landing to reposition itself close to a geyser site, and wait through the winter until the first sunlight of spring to witness first-hand the geyser phenomenon.

  19. Nuclear electric propulsion: A better, safer, cheaper transportation system for human exploration of Mars

    NASA Technical Reports Server (NTRS)

    Clark, John S.; George, Jeffrey A.; Gefert, Leon P.; Doherty, Michael P.; Sefcik, Robert J.

    1994-01-01

    NASA has completed a preliminary mission and systems study of nuclear electric propulsion (NEP) systems for 'split-sprint' human exploration and related robotic cargo missions to Mars. This paper describes the study, the mission architecture selected, the NEP system and technology development needs, proposed development schedules, and estimated development costs. Since current administration policy makers have delayed funding for key technology development activities that could make Mars exploration missions a reality in the near future, NASA will have time to evaluate various alternate mission options, and it appears prudent to ensure that Mars mission plans focus on astronaut and mission safety, while reducing costs to acceptable levels. The split-sprint nuclear electric propulsion system offers trip times comparable to nuclear thermal propulsion (NTP) systems, while providing mission abort opportunities that are not possible with 'reference' mission architectures. Thus, NEP systems offer short transit times for the astronauts, reducing the exposure of the crew to intergalactic cosmic radiation. The high specific impulse of the NEP system, which leads to very low propellant requirements, results in significantly lower 'initial mass in low earth orbit' (IMLEO). Launch vehicle packaging studies show that the NEP system can be launched, assembled, and deployed, with about one less 240-metric-ton heavy lift launch vehicle (HLLV) per mission opportunity - a very Technology development cost of the nuclear reactor for an NEP system would be shared with the proposed nuclear surface power systems, since nuclear systems will be required to provide substantial electrical power on the surface of Mars. The NEP development project plan proposed includes evolutionary technology development for nuclear electric propulsion systems that expands upon SP-100 (Space Power - 100 kw(e)) technology that has been developed for lunar and Mars surface nuclear power, and small NEP systems for interplanetary probes. System upgrades are expected to evolve that will result in even shorter trip times, improved payload capabilities, and enhanced safety and reliability.

  20. Mars Communication Protocols

    NASA Technical Reports Server (NTRS)

    Kazz, G. J.; Greenberg, E.

    2000-01-01

    Over the next decade, international plans and commitments are underway to develop an infrastructure at Mars to support future exploration of the red planet. The purpose of this infrastructure is to provide reliable global communication and navigation coverage for on-approach, landed, roving, and in-flight assets at Mars. The claim is that this infrastructure will: 1) eliminate the need of these assets to carry Direct to Earth (DTE) communications equipment, 2) significantly increase data return and connectivity, 3) enable small mission exploration of Mars without DTE equipment, 4) provide precision navigation i.e., 10 to 100m position resolution, 5) supply timing reference accurate to 10ms. This paper in particular focuses on two CCSDS recommendations for that infrastructure: CCSDS Proximity-1 Space Link Protocol and CCSDS File Delivery Protocol (CFDP). A key aspect of Mars exploration will be the ability of future missions to interoperate. These protocols establish a framework for interoperability by providing standard communication, navigation, and timing services. In addition, these services include strategies to recover gracefully from communication interruptions and interference while ensuring backward compatibility with previous missions from previous phases of exploration.

  1. Solid Waste Management Requirements Definition for Advanced Life Support Missions: Results

    NASA Technical Reports Server (NTRS)

    Alazraki, Michael P.; Hogan, John; Levri, Julie; Fisher, John; Drysdale, Alan

    2002-01-01

    Prior to determining what Solid Waste Management (SWM) technologies should be researched and developed by the Advanced Life Support (ALS) Project for future missions, there is a need to define SWM requirements. Because future waste streams will be highly mission-dependent, missions need to be defined prior to developing SWM requirements. The SWM Working Group has used the mission architecture outlined in the System Integration, Modeling and Analysis (SIMA) Element Reference Missions Document (RMD) as a starting point in the requirement development process. The missions examined include the International Space Station (ISS), a Mars Dual Lander mission, and a Mars Base. The SWM Element has also identified common SWM functionalities needed for future missions. These functionalities include: acceptance, transport, processing, storage, monitoring and control, and disposal. Requirements in each of these six areas are currently being developed for the selected missions. This paper reviews the results of this ongoing effort and identifies mission-dependent resource recovery requirements.

  2. Aerocapture for manned Mars missions - Status and challenges

    NASA Astrophysics Data System (ADS)

    Walberg, Gerald D.

    1991-08-01

    The current status for manned Mars missions and the associated challenges are summarized. Mission benefits are considered to increase with increasing Mars entry velocity. However, significant benefits accrue at moderate entry velocities between 7 and 8 km/sec, which is the realistically achievable range in view of g-limits and heating constraints. Blunt, low mass/drag coefficient (reference area) vehicles with L/Ds from 0.3 to 0.5 are found to be the preferred configurations, taking into account their adequate control authority and good payload packaging characteristics. The overall design characteristics of Mars aerocapture vehicles can be established with good confidence, using flight and ground test data and the state-of-the-art flow field analysis techniques. The principal challenges are identified as follows: to refine the knowledge of the Martian atmosphere in order to reduce design conservatism, to extend present stagnation region heating analyses to the entire vehicle forebody, and to develop reflective low-wall-catalycity TPS systems for enabling reusable vehicles.

  3. Aerocapture for manned Mars missions - Status and challenges

    NASA Technical Reports Server (NTRS)

    Walberg, Gerald D.

    1991-01-01

    The current status for manned Mars missions and the associated challenges are summarized. Mission benefits are considered to increase with increasing Mars entry velocity. However, significant benefits accrue at moderate entry velocities between 7 and 8 km/sec, which is the realistically achievable range in view of g-limits and heating constraints. Blunt, low mass/drag coefficient (reference area) vehicles with L/Ds from 0.3 to 0.5 are found to be the preferred configurations, taking into account their adequate control authority and good payload packaging characteristics. The overall design characteristics of Mars aerocapture vehicles can be established with good confidence, using flight and ground test data and the state-of-the-art flow field analysis techniques. The principal challenges are identified as follows: to refine the knowledge of the Martian atmosphere in order to reduce design conservatism, to extend present stagnation region heating analyses to the entire vehicle forebody, and to develop reflective low-wall-catalycity TPS systems for enabling reusable vehicles.

  4. Asymptotic Parachute Performance Sensitivity

    NASA Technical Reports Server (NTRS)

    Way, David W.; Powell, Richard W.; Chen, Allen; Steltzner, Adam D.

    2006-01-01

    In 2010, the Mars Science Laboratory mission will pioneer the next generation of robotic Entry, Descent, and Landing systems by delivering the largest and most capable rover to date to the surface of Mars. In addition to landing more mass than any other mission to Mars, Mars Science Laboratory will also provide scientists with unprecedented access to regions of Mars that have been previously unreachable. By providing an Entry, Descent, and Landing system capable of landing at altitudes as high as 2 km above the reference gravitational equipotential surface, or areoid, as defined by the Mars Orbiting Laser Altimeter program, Mars Science Laboratory will demonstrate sufficient performance to land on 83% of the planet s surface. By contrast, the highest altitude landing to date on Mars has been the Mars Exploration Rover at 1.3 km below the areoid. The coupling of this improved altitude performance with latitude limits as large as 60 degrees off of the equator and a precise delivery to within 10 km of a surface target, will allow the science community to select the Mars Science Laboratory landing site from thousands of scientifically interesting possibilities. In meeting these requirements, Mars Science Laboratory is extending the limits of the Entry, Descent, and Landing technologies qualified by the Mars Viking, Mars Pathfinder, and Mars Exploration Rover missions. Specifically, the drag deceleration provided by a Viking-heritage 16.15 m supersonic Disk-Gap-Band parachute in the thin atmosphere of Mars is insufficient, at the altitudes and ballistic coefficients under consideration by the Mars Science Laboratory project, to maintain necessary altitude performance and timeline margin. This paper defines and discusses the asymptotic parachute performance observed in Monte Carlo simulation and performance analysis and its effect on the Mars Science Laboratory Entry, Descent, and Landing architecture.

  5. Conceptual Design For Interplanetary Spaceship Discovery

    NASA Astrophysics Data System (ADS)

    Benton, Mark G.

    2006-01-01

    With the recently revived national interest in Lunar and Mars missions, this design study was undertaken by the author in an attempt to satisfy the long-term space exploration vision of human travel ``to the Moon, Mars, and beyond'' with a single design or family of vehicles. This paper describes a conceptual design for an interplanetary spaceship of the not-to-distant future. It is a design that is outwardly similar to the spaceship Discovery depicted in the novel ``2001 - A Space Odyssey'' and film of the same name. Like its namesake, this spaceship could one day transport a human expedition to explore the moons of Jupiter. This spaceship Discovery is a real engineering design that is capable of being implemented using technologies that are currently at or near the state-of-the-art. The ship's main propulsion and electrical power are provided by bi-modal nuclear thermal rocket engines. Configurations are presented to satisfy four basic Design Reference Missions: (1) a high-energy mission to Jupiter's moon Callisto, (2) a high-energy mission to Mars, (3) a low-energy mission to Mars, and (4) a high-energy mission to the Moon. The spaceship design includes dual, strap-on boosters to enable the high-energy Mars and Jupiter missions. Three conceptual lander designs are presented: (1) Two types of Mars landers that utilize atmospheric and propulsive braking, and (2) a lander for Callisto or Earth's Moon that utilizes only propulsive braking. Spaceship Discovery offers many advantages for human exploration of the Solar System: (1) Nuclear propulsion enables propulsive capture and escape maneuvers at Earth and target planets, eliminating risky aero-capture maneuvers. (2) Strap-on boosters provide robust propulsive energy, enabling flexibility in mission planning, shorter transit times, expanded launch windows, and free-return abort trajectories from Mars. (3) A backup abort propulsion system enables crew aborts at multiple points in the mission. (4) Clustered NTR engines provide ``engine out'' redundancy. (5) The design efficiently implements galactic cosmic ray shielding using main propellant liquid hydrogen. (6) The design provides artificial gravity to mitigate crew physiological problems on long-duration missions. (7) The design is modular and can be launched using the proposed upgrades to the Evolved Expendable Launch Vehicles or Shuttle-derived heavy lift launch vehicles. (8) High value modules are reusable for Mars and Lunar missions. (9) The design has inherent growth capability, and can be tailored to satisfy expanding mission requirements to enable an in-family progression ``to the Moon, Mars, and beyond.''

  6. Assessing Group Dynamics in a Mars Simulation

    NASA Astrophysics Data System (ADS)

    Bishop, S. L.

    2007-10-01

    International interest in psychosocial functioning generally and issues of group and inter-group function for space crews has increased as focus has shifted towards longer duration spaceflight and, particularly, the issues involved in sending a human crew to Mars (Kanas, et al., 2001; Dawson, 2002). Planning documents for a human mission to Mars such as the NASA Design Reference Mission (DRM 1.0) emphasize the need for adaptability of crewmembers and autonomy in the crew as a whole (Hoffman and Kaplan, 1997). Similarly a major study by the International Space University (ISU, 1991) emphasized the need for autonomy and initiative for a Mars crew given that many of the scenarios that will be encountered on Mars cannot be rehearsed on earth and given the lack of any realistic possibility for rescue of the crew. This research project was only one subset of data collected during the larger AustroMars Expedition at the Mars Desert Research Facility (MDRS) in 2006. The participating crew comprises part of a multi-year investigation on teams utilizing the MDRS facility. The program of research has included numerous researchers since 2002 with a progressive evolution of key foci addressing stress, personality, coping, adaptation, cognitive functioning, and group identity assessed across the duration period of the individual missions.

  7. Habitability in Advanced Space Mission Design. Part 2; Evaluation of Habitation Elements

    NASA Technical Reports Server (NTRS)

    Adams, Constance M.; McCurdy, Matthew R.

    2000-01-01

    Habitability is a fundamental component of any long-duration human habitat. Due to the pressures on the crew and the criticality of their performance, this is particularly true of habitats or vehicles proposed for use in any human space mission of duration over 30 days. This paper, the second of three on this subject, will focus on evaluating all the vehicles currently under consideration for the Mars Design Reference Mission through application of metrics for habitability (proposed in a previous paper, see references Adams/McCurdy 1999).

  8. Benefits of Power and Propulsion Technology for a Piloted Electric Vehicle to an Asteroid

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Oleson, Steven R.; Pencil, Eric J.; Piszczor, Michael F.; Mason, Lee S.; Bury, Kristen M.; Manzella, David H.; Kerslake, Thomas W.; Hojinicki, Jeffrey S.; Brophy, John P.

    2012-01-01

    NASA s goal for human spaceflight is to expand permanent human presence beyond low Earth orbit (LEO). NASA is identifying potential missions and technologies needed to achieve this goal. Mission options include crewed destinations to LEO and the International Space Station; high Earth orbit and geosynchronous orbit; cis-lunar space, lunar orbit, and the surface of the Moon; near-Earth objects; and the moons of Mars, Mars orbit, and the surface of Mars. NASA generated a series of design reference missions to drive out required functions and capabilities for these destinations, focusing first on a piloted mission to a near-Earth asteroid. One conclusion from this exercise was that a solar electric propulsion stage could reduce mission cost by reducing the required number of heavy lift launches and could increase mission reliability by providing a robust architecture for the long-duration crewed mission. Similarly, solar electric vehicles were identified as critical for missions to Mars, including orbiting Mars, landing on its surface, and visiting its moons. This paper describes the parameterized assessment of power and propulsion technologies for a piloted solar electric vehicle to a near-Earth asteroid. The objective of the assessment was to determine technology drivers to advance the state of the art of electric propulsion systems for human exploration. Sensitivity analyses on the performance characteristics of the propulsion and power systems were done to determine potential system-level impacts of improved technology. Starting with a "reasonable vehicle configuration" bounded by an assumed launch date, we introduced technology improvements to determine the system-level benefits (if any) that those technologies might provide. The results of this assessment are discussed and recommendations for future work are described.

  9. Benefits of Power and Propulsion Technology for a Piloted Electric Vehicle to an Asteroid

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Oleson, Steven R.; Pencil, Eric J.; Piszczor, Michael F.; Mason, Lee S.; Bury, Kristen M.; Manzella, David H.; Kerslake, Thomas W.; Hojinicki, Jeffrey S.; Brophy, John P.

    2011-01-01

    NASA's goal for human spaceflight is to expand permanent human presence beyond low Earth orbit (LEO). NASA is identifying potential missions and technologies needed to achieve this goal. Mission options include crewed destinations to LEO and the International Space Station; high Earth orbit and geosynchronous orbit; cis-lunar space, lunar orbit, and the surface of the Moon; near-Earth objects; and the moons of Mars, Mars orbit, and the surface of Mars. NASA generated a series of design reference missions to drive out required functions and capabilities for these destinations, focusing first on a piloted mission to a near-Earth asteroid. One conclusion from this exercise was that a solar electric propulsion stage could reduce mission cost by reducing the required number of heavy lift launches and could increase mission reliability by providing a robust architecture for the long-duration crewed mission. Similarly, solar electric vehicles were identified as critical for missions to Mars, including orbiting Mars, landing on its surface, and visiting its moons. This paper describes the parameterized assessment of power and propulsion technologies for a piloted solar electric vehicle to a near-Earth asteroid. The objective of the assessment was to determine technology drivers to advance the state of the art of electric propulsion systems for human exploration. Sensitivity analyses on the performance characteristics of the propulsion and power systems were done to determine potential system-level impacts of improved technology. Starting with a "reasonable vehicle configuration" bounded by an assumed launch date, we introduced technology improvements to determine the system-level benefits (if any) that those technologies might provide. The results of this assessment are discussed and recommendations for future work are described.

  10. Surface Nuclear Power for Human Mars Missions

    NASA Technical Reports Server (NTRS)

    Mason, Lee S.

    1999-01-01

    The Design Reference Mission for NASA's human mission to Mars indicates the desire for in-situ propellant production and bio-regenerative life systems to ease Earth launch requirements. These operations, combined with crew habitation and science, result in surface power requirements approaching 160 kilowatts. The power system, delivered on an early cargo mission, must be deployed and operational prior to crew departure from Earth. The most mass efficient means of satisfying these requirements is through the use of nuclear power. Studies have been performed to identify a potential system concept using a mobile cart to transport the power system away from the Mars lander and provide adequate separation between the reactor and crew. The studies included an assessment of reactor and power conversion technology options, selection of system and component redundancy, determination of optimum separation distance, and system performance sensitivity to some key operating parameters. The resulting system satisfies the key mission requirements including autonomous deployment, high reliability, and cost effectiveness at a overall system mass of 12 tonnes and a stowed volume of about 63 cu m.

  11. Fast Track Lunar NTR Systems Assessment for NASA's First Lunar Outpost and Its Evolvability to Mars

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; Alexander, Stephen W.

    1995-01-01

    Integrated systems and missions studies are presented for an evolutionary lunar-to-Mars space transportation system (STS) based on nuclear thermal rocket (NTR) technology. A 'standardized' set of engine and stage components are identified and used in a 'building block' fashion to configure a variety of piloted and cargo, lunar and Mars vehicles. The reference NTR characteristics include a thrust of 50 thousand pounds force (klbf), specific impulse (I(sub sp)) of 900 seconds, and an engine thrust-to-weight ratio of 4. 3. For the National Aeronautics and Space Administrations (NASA) First Lunar Outpost (FLO) mission, and expendable NTR stage powered by two such engines can deliver approximately 96 metric tonnes (t) to trans-lunar injection (TLI) conditions for an initial mass in low Earth orbit (IMLEO) of approximately 198 t compared to 250 t for a cryogenic chemical system. The stage liquid hydrogen (LH2) tank has a diameter, length, and capacity of 10 m, 14.5 m and 66 t, respectively. By extending the stage length and LH2 capacity to approximately 20 m and 96 t, a single launch Mars cargo vehicle could deliver to an elliptical Mars parking orbit a 63 t Mars excursion vehicle (MEV) with a 45 t surface payload. Three 50 klbf engines and the two standardized LH2 tanks developed for the lunar and Mars cargo vehicles are used to configure the vehicles supporting piloted Mars missions as early as 2010. The 'modular' NTR vehicle approach forms the basis for an efficient STS able to handle the needs of a wide spectrum of lunar and Mars missions.

  12. Performance Testing of Yardney Li-Ion Cells and Batteries in Support of JPL's 2009 Mars Science Laboratory Mission

    NASA Technical Reports Server (NTRS)

    Smart, M.C.; Ratnakumar, B.V.; Whitcanack, L. D.; Dewell, E. A.; Jones, L. E.; Salvo, C. G.; Puglia, F. J.; Cohen, S.; Gitzendanner, R.

    2008-01-01

    In 2009, JPL is planning to launch an unmanned rover mission to the planet Mars. This mission, referred to as the Mars Science Laboratory (MSL), will involve the use of a rover that is much larger than the previously developed Spirit and Opportunity Rovers for the 2003 Mars Exploration Rover (MER) mission, that are currently still in operation on the surface of the planet after more than three years. Part of the reason that the MER rovers have operated so successfully, far exceeding the required mission duration of 90 sols, is that they possess robust Li-ion batteries, manufactured by Yardney Technical Products, which have demonstrated excellent life characteristics. Given the excellent performance characteristics displayed, similar lithium-ion batteries have been projected to successfully meet the mission requirements of the up-coming MSL mission. Although comparable in many facets, such as being required to operate over a wide temperature range (-20 to 40 C), the MSL mission has more demanding performance requirements compared to the MER mission, including much longer mission duration (approx. 687 sols vs. 90 sols), higher power capability, and the need to withstand higher temperature excursions. In addition, due to the larger rover size, the MSL mission necessitates the use of a much larger battery to meet the energy, life, and power requirements. In order to determine the viability of meeting these requirements, a number of performance verification tests were performed on 10 Ah Yardney lithium-ion cells (MER design) under MSL-relevant conditions, including mission surface operation simulation testing. In addition, the performance of on-going ground life testing of 10 Ah MER cells and 8-cell batteries will be discussed in the context of capacity loss and impedance growth predictions.

  13. Medicine on Mars: Remote medical care and the space exploration initiative

    NASA Technical Reports Server (NTRS)

    Simmons, S. C.; Billica, R. D.

    1992-01-01

    Mars exploration missions as described in the Synthesis Group report will involve extended exposures of crew members to remote, hazardous environments for up to 100 days. Maintenance of crew health and performance will be critical to ensure mission success. Because of the great distances between the Earth and Mars, round trip telecommunication will take from seven to forty minutes and immediate return to Earth will not be feasible: an autonomous medical care system that integrates preventive, occupational, and environmental aspects of health care and provides diagnostic and treatment capabilities will be necessary. Providing medical care for Mars explorers will pose some unique technical and engineering challenges. Medical care equipment will need to be designed to be modular and portable to ensure that it is interchangeable between vehicle and planetary surface elements. Miniaturization will be necessary to reduce mass and volume. Computerized systems that automatically acquire and manage medical information and provide medical references (literature), decision support, and automated medical record keeping will be a crucial part of a Martian medical care system. Medical care will also rely on remote consultation with Earth-based specialists. This presentation will provide an overview of the health and medical concerns associated with Mars exploration missions and will describe some specific concepts for Mars medical care systems.

  14. An Overview of Mars Vicinity Transportation Concepts for a Human Mars Mission

    NASA Technical Reports Server (NTRS)

    Dexter, Carol E.; Kos, Larry

    1998-01-01

    To send a piloted mission to Mars, transportation systems must be developed for the Earth to Orbit, trans Mars injection (TMI), capture into Mars orbit, Mars descent, surface stay, Mars ascent, trans Earth injection (TEI), and Earth return phases. This paper presents a brief overview of the transportation systems for the Human Mars Mission (HMM) only in the vicinity of Mars. This includes: capture into Mars orbit, Mars descent, surface stay, and Mars ascent. Development of feasible mission scenarios now is important for identification of critical technology areas that must be developed to support future human missions. Although there is no funded human Mars mission today, architecture studies are focusing on missions traveling to Mars between 2011 and the early 2020's.

  15. Independent Verification of Mars-GRAM 2010 with Mars Climate Sounder Data

    NASA Technical Reports Server (NTRS)

    Justh, Hilary L.; Burns, Kerry L.

    2014-01-01

    The Mars Global Reference Atmospheric Model (Mars-GRAM) is an engineering-level atmospheric model widely used for diverse mission and engineering applications. Applications of Mars-GRAM include systems design, performance analysis, and operations planning for aerobraking, entry, descent and landing, and aerocapture. Atmospheric influences on landing site selection and long-term mission conceptualization and development can also be addressed utilizing Mars-GRAM. Mars-GRAM's perturbation modeling capability is commonly used, in a Monte Carlo mode, to perform high-fidelity engineering end-to-end simulations for entry, descent, and landing. Mars-GRAM is an evolving software package resulting in improved accuracy and additional features. Mars-GRAM 2005 has been validated against Radio Science data, and both nadir and limb data from the Thermal Emission Spectrometer (TES). From the surface to 80 km altitude, Mars-GRAM is based on the NASA Ames Mars General Circulation Model (MGCM). Above 80 km, Mars-GRAM is based on the University of Michigan Mars Thermospheric General Circulation Model (MTGCM). The most recent release of Mars-GRAM 2010 includes an update to Fortran 90/95 and the addition of adjustment factors. These adjustment factors are applied to the input data from the MGCM and the MTGCM for the mapping year 0 user-controlled dust case. The adjustment factors are expressed as a function of height (z), latitude and areocentric solar longitude (Ls).

  16. Examining Mars with SPICE

    NASA Technical Reports Server (NTRS)

    Acton, Charles H.; Bachman, Nathaniel J.; Bytof, Jeff A.; Semenov, Boris V.; Taber, William; Turner, F. Scott; Wright, Edward D.

    1999-01-01

    The International Mars Conference highlights the wealth of scientific data now and soon to be acquired from an international armada of Mars-bound robotic spacecraft. Underlying the planning and interpretation of these scientific observations around and upon Mars are ancillary data and associated software needed to deal with trajectories or locations, instrument pointing, timing and Mars cartographic models. The NASA planetary community has adopted the SPICE system of ancillary data standards and allied tools to fill the need for consistent, reliable access to these basic data and a near limitless range of derived parameters. After substantial rapid growth in its formative years, the SPICE system continues to evolve today to meet new needs and improve ease of use. Adaptations to handle landers and rovers were prototyped on the Mars pathfinder mission and will next be used on Mars '01-'05. Incorporation of new methods to readily handle non-inertial reference frames has vastly extended the capability and simplified many computations. A translation of the SPICE Toolkit software suite to the C language has just been announced. To further support cartographic calculations associated with Mars exploration the SPICE developers at JPL have recently been asked by NASA to work with cartographers to develop standards and allied software for storing and accessing control net and shape model data sets; these will be highly integrated with existing SPICE components. NASA specifically supports the widest possible utilization of SPICE capabilities throughout the international space science community. With NASA backing the Russian Space Agency and Russian Academy of Science adopted the SPICE standards for the Mars 96 mission. The SPICE ephemeris component will shortly become the international standard for agencies using the Deep Space Network. U.S. and European scientists hope that ESA will employ SPICE standards on the Mars Express mission. SPICE is an open set of standards, and all related specifications and software are freely distributed around the world. This poster describes the current state of SPICE system development, with special emphasis on current and planned support for Mars exploration missions.

  17. Modular Growth NTR Space Transportation System for Future NASA Human Lunar, NEA and Mars Exploration Missions

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; McCurdy, David R.; Packard, Thomas W.

    2012-01-01

    The nuclear thermal rocket (NTR) is a proven, high thrust propulsion technology that has twice the specific impulse (I(sub sp) approx.900 s) of today's best chemical rockets. During the Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) programs, twenty rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability - everything required for affordable human missions beyond LEO. In NASA's recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower IMLEO, versatile vehicle design, and growth potential. Furthermore, the NTR requires no large technology scale-ups since the smallest engine tested during the Rover program - the 25 klb(sub f) "Pewee" engine is sufficient for human Mars missions when used in a clustered engine configuration. The "Copernicus" crewed Mars transfer vehicle developed for DRA 5.0 was an expendable design sized for fast-conjunction, long surface stay Mars missions. It therefore has significant propellant capacity allowing a reusable "1-year" round trip human mission to a large, high energy near Earth asteroid (NEA) like Apophis in 2028. Using a "split mission" approach, Copernicus and its two key elements - a common propulsion stage and integrated "saddle truss" and LH2 drop tank assembly - configured as an Earth Return Vehicle / propellant tanker, can also support a short round trip (approx.18 month) / short orbital stay (60 days) Mars reconnaissance mission in the early 2030's before a landing is attempted. The same short stay orbital mission can be performed with an "all-up" vehicle by adding an "in-line" LH2 tank to Copernicus to supply the extra propellant needed for this higher energy, opposition-class mission. To transition to a reusable Mars architecture, Copernicus' saddle truss / drop tank assembly is replaced by an in-line tank and "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. Shorter "1-way" transit time fast-conjunction Mars missions are another possibility using this vehicle configuration but, as with reusability, increased launch mass is required. "Scaled down" versions of Copernicus (sized to a SLS lift capability of approx.70 t - 100 t) can be developed initially allowing reusable lunar cargo delivery and crewed landing missions, easy NEA missions (e.g., 2000 SG344 also in 2028) or an expendable mission to Apophis. Mission scenario descriptions, key vehicle features and operational characteristics are provided along with a brief discussion of NASA's current activities and its "pre-decisional" plans for future NTR development.

  18. Atmospheric Modeling Using Accelerometer Data During Mars Atmosphere and Volatile Evolution (MAVEN) Flight Operations

    NASA Technical Reports Server (NTRS)

    Tolson, Robert H.; Lugo, Rafael A.; Baird, Darren T.; Cianciolo, Alicia D.; Bougher, Stephen W.; Zurek, Richard M.

    2017-01-01

    The Mars Atmosphere and Volatile EvolutioN (MAVEN) spacecraft is a NASA orbiter designed to explore the Mars upper atmosphere, typically from 140 to 160 km altitude. In addition to the nominal science mission, MAVEN has performed several Deep Dip campaigns in which the orbit's closest point of approach, also called periapsis, was lowered to an altitude range of 115 to 135 km. MAVEN accelerometer data were used during mission operations to estimate atmospheric parameters such as density, scale height, along-track gradients, and wave structures. Density and scale height estimates were compared against those obtained from the Mars Global Reference Atmospheric Model and used to aid the MAVEN navigation team in planning maneuvers to raise and lower periapsis during Deep Dip operations. This paper describes the processes used to reconstruct atmosphere parameters from accelerometers data and presents the results of their comparison to model and navigation-derived values.

  19. The Next Generation of Mars-GRAM and Its Role in the Autonomous Aerobraking Development Plan

    NASA Technical Reports Server (NTRS)

    Justh, Hilary L.; Justus, Carl G.; Ramey, Holly S.

    2011-01-01

    The Mars Global Reference Atmospheric Model (Mars-GRAM) is an engineering-level atmospheric model widely used for diverse mission applications. Mars-GRAM 2010 is currently being used to develop the onboard atmospheric density estimator that is part of the Autonomous Aerobraking Development Plan. In previous versions, Mars-GRAM was less than realistic when used for sensitivity studies for Thermal Emission Spectrometer (TES) MapYear=0 and large optical depth values, such as tau=3. A comparison analysis has been completed between Mars-GRAM, TES and data from the Planetary Data System (PDS) resulting in updated coefficients for the functions relating density, latitude, and longitude of the sun. The adjustment factors are expressed as a function of height (z), Latitude (Lat) and areocentric solar longitude (Ls). The latest release of Mars-GRAM 2010 includes these adjustment factors that alter the in-put data from MGCM and MTGCM for the Mapping Year 0 (user-controlled dust) case. The greatest adjustment occurs at large optical depths such as tau greater than 1. The addition of the adjustment factors has led to better correspondence to TES Limb data from 0-60 km as well as better agreement with MGS, ODY and MRO data at approximately 90-135 km. Improved simulations utilizing Mars-GRAM 2010 are vital to developing the onboard atmospheric density estimator for the Autonomous Aerobraking Development Plan. Mars-GRAM 2010 was not the only planetary GRAM utilized during phase 1 of this plan; Titan-GRAM and Venus-GRAM were used to generate density data sets for Aerobraking Design Reference Missions. These data sets included altitude profiles (both vertical and along a trajectory), GRAM perturbations (tides, gravity waves, etc.) and provided density and scale height values for analysis by other Autonomous Aero-braking team members.

  20. Deep Space Gateway - Enabling Missions to Mars

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle; Connolly, John

    2017-01-01

    There are many opportunities for commonality between Lunar vicinity and Mars mission hardware and operations. Best approach: Identify Mars mission risks that can be bought down with testing in the Lunar vicinity, then explore hardware and operational concepts that work for both missions with minimal compromise. Deep Space Transport will validate the systems and capabilities required to send humans to Mars orbit and return to Earth. Deep Space Gateway provides a convenient assembly, checkout, and refurbishment location to enable Mars missions Current deep space transport concept is to fly missions of increasing complexity: Shakedown cruise, Mars orbital mission, Mars surface mission; Mars surface mission would require additional elements.

  1. Telecommunications, navigation and information management concept overview for the Space Exploration Initiative program

    NASA Technical Reports Server (NTRS)

    Bell, Jerome A.; Stephens, Elaine; Barton, Gregg

    1991-01-01

    An overview is provided of the Space Exploration Initiative (SEI) concepts for telecommunications, information systems, and navigation (TISN), and engineering and architecture issues are discussed. The SEI program data system is reviewed to identify mission TISN interfaces, and reference TISN concepts are described for nominal, degraded, and mission-critical data services. The infrastructures reviewed include telecommunications for robotics support, autonomous navigation without earth-based support, and information networks for tracking and data acquisition. Four options for TISN support architectures are examined which relate to unique SEI exploration strategies. Detailed support estimates are given for: (1) a manned stay on Mars; (2) permanent lunar and Martian settlements; short-duration missions; and (4) systematic exploration of the moon and Mars.

  2. Nuclear Thermal Rocket/Vehicle Design Options for Future NASA Missions to the Moon and Mars

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; Corban, Robert R.; Mcguire, Melissa L.; Beke, Erik G.

    1995-01-01

    The nuclear thermal rocket (NTR) provides a unique propulsion capability to planners/designers of future human exploration missions to the Moon and Mars. In addition to its high specific impulse (approximately 850-1000 s) and engine thrust-to-weight ratio (approximately 3-10), the NTR can also be configured as a 'dual mode' system capable of generating electrical power for spacecraft environmental systems, communications, and enhanced stage operations (e.g., refrigeration for long-term liquid hydrogen storage). At present the Nuclear Propulsion Office (NPO) is examining a variety of mission applications for the NTR ranging from an expendable, single-burn, trans-lunar injection (TLI) stage for NASA's First Lunar Outpost (FLO) mission to all propulsive, multiburn, NTR-powered spacecraft supporting a 'split cargo-piloted sprint' Mars mission architecture. Each application results in a particular set of requirements in areas such as the number of engines and their respective thrust levels, restart capability, fuel operating temperature and lifetime, cryofluid storage, and stage size. Two solid core NTR concepts are examined -- one based on NERVA (Nuclear Engine for Rocket Vehicle Application) derivative reactor (NDR) technology, and a second concept which utilizes a ternary carbide 'twisted ribbon' fuel form developed by the Commonwealth of Independent States (CIS). The NDR and CIS concepts have an established technology database involving significant nuclear testing at or near representative operating conditions. Integrated systems and mission studies indicate that clusters of two to four 15 to 25 klbf NDR or CIS engines are sufficient for most of the lunar and Mars mission scenarios currently under consideration. This paper provides descriptions and performance characteristics for the NDR and CIS concepts, summarizes NASA's First Lunar Outpost and Mars mission scenarios, and describes characteristics for representative cargo and piloted vehicles compatible with a reference 240 t-class heavy lift launch vehicle (HLLV) and smaller 120 t HLLV option. Attractive performance characteristics and high-leverage technologies associated with both the engine and stage are identified, and supporting parametric sensitivity data is provided. The potential for commonality of engine and stage components to satisfy a broad range of lunar and Mars missions is also discussed.

  3. 21st century early mission concepts for Mars delivery and earth return

    NASA Technical Reports Server (NTRS)

    Cruz, Manuel I.; Ilgen, Marc R.

    1990-01-01

    In the 21st century, the early missions to Mars will entail unmanned Rover and Sample Return reconnaissance missions to be followed by manned exploration missions. High performance leverage technologies will be required to reach Mars and return to earth. This paper describes the mission concepts currently identified for these early Mars missions. These concepts include requirements and capabilities for Mars and earth aerocapture, Mars surface operations and ascent, and Mars and earth rendezvous. Although the focus is on the unmanned missions, synergism with the manned missions is also discussed.

  4. Meditations on the new space vision: The moon as a stepping stone to mars

    NASA Astrophysics Data System (ADS)

    Mendell, W. W.

    2005-07-01

    The Vision for Space Exploration invokes activities on the Moon in preparation for exploration of Mars and also directs International Space Station (ISS) research toward the same goal. Lunar missions will emphasize development of capability and concomitant reduction of risk for future exploration of Mars. Earlier papers identified three critical issues related to the so-called NASA Mars Design Reference Mission (MDRM) to be addressed in the lunar context: (a) safety, health, and performance of the human crew; (b) various modalities of mission operations ranging surface activities to logistics, planning, and navigation; and (c) reliability and maintainability of systems in the planetary environment. In simple terms, lunar expeditions build a résumé that demonstrates the ability to design, construct, and operate an enterprise such as the MDRM with an expectation of mission success. We can evolve from Apollo-like missions to ones that resemble the complexity and duration of the MDRM. Investment in lunar resource utilization technologies falls naturally into the Vision. NASA must construct an exit strategy from the Moon in the third decade. With a mandate for continuing exploration, it cannot assume responsibility for long-term operation of lunar assets. Therefore, NASA must enter into a partnership with some other entity—governmental, international, or commercial—that can responsibly carry on lunar development past the exploration phase.

  5. Meditations on the new space vision: the Moon as a stepping stone to Mars.

    PubMed

    Mendell, W W

    2005-01-01

    The Vision for Space Exploration invokes activities on the Moon in preparation for exploration of Mars and also directs International Space Station (ISS) research toward the same goal. Lunar missions will emphasize development of capability and concomitant reduction of risk for future exploration of Mars. Earlier papers identified three critical issues related to the so-called NASA Mars Design Reference Mission (MDRM) to be addressed in the lunar context: (a) safety, health, and performance of the human crew; (b) various modalities of mission operations ranging surface activities to logistics, planning, and navigation; and (c) reliability and maintainability of systems in the planetary environment. In simple terms, lunar expeditions build a résumé that demonstrates the ability to design, construct, and operate an enterprise such as the MDRM with an expectation of mission success. We can evolve from Apollo-like missions to ones that resemble the complexity and duration of the MDRM. Investment in lunar resource utilization technologies falls naturally into the Vision. NASA must construct an exit strategy from the Moon in the third decade. With a mandate for continuing exploration, it cannot assume responsibility for long-term operation of lunar assets. Therefore, NASA must enter into a partnership with some other entity--governmental, international, or commercial--that can responsibly carry on lunar development past the exploration phase. Published by Elsevier Ltd.

  6. A computational intelligence approach to the Mars Precision Landing problem

    NASA Astrophysics Data System (ADS)

    Birge, Brian Kent, III

    Various proposed Mars missions, such as the Mars Sample Return Mission (MRSR) and the Mars Smart Lander (MSL), require precise re-entry terminal position and velocity states. This is to achieve mission objectives including rendezvous with a previous landed mission, or reaching a particular geographic landmark. The current state of the art footprint is in the magnitude of kilometers. For this research a Mars Precision Landing is achieved with a landed footprint of no more than 100 meters, for a set of initial entry conditions representing worst guess dispersions. Obstacles to reducing the landed footprint include trajectory dispersions due to initial atmospheric entry conditions (entry angle, parachute deployment height, etc.), environment (wind, atmospheric density, etc.), parachute deployment dynamics, unavoidable injection error (propagated error from launch on), etc. Weather and atmospheric models have been developed. Three descent scenarios have been examined. First, terminal re-entry is achieved via a ballistic parachute with concurrent thrusting events while on the parachute, followed by a gravity turn. Second, terminal re-entry is achieved via a ballistic parachute followed by gravity turn to hover and then thrust vector to desired location. Third, a guided parafoil approach followed by vectored thrusting to reach terminal velocity is examined. The guided parafoil is determined to be the best architecture. The purpose of this study is to examine the feasibility of using a computational intelligence strategy to facilitate precision planetary re-entry, specifically to take an approach that is somewhat more intuitive and less rigid, and see where it leads. The test problems used for all research are variations on proposed Mars landing mission scenarios developed by NASA. A relatively recent method of evolutionary computation is Particle Swarm Optimization (PSO), which can be considered to be in the same general class as Genetic Algorithms. An improvement over the regular PSO algorithm, allowing tracking of nonstationary error functions is detailed. Continued refinement of PSO in the larger research community comes from attempts to understand human-human social interaction as well as analysis of the emergent behavior. Using PSO and the parafoil scenario, optimized reference trajectories are created for an initial condition set of 76 states, representing the convex hull of 2001 states from an early Monte Carlo analysis. The controls are a set series of bank angles followed by a set series of 3DOF thrust vectoring. The reference trajectories are used to train an Artificial Neural Network Reference Trajectory Generator (ANNTraG), with the (marginal) ability to generalize a trajectory from initial conditions it has never been presented. The controls here allow continuous change in bank angle as well as thrust vector. The optimized reference trajectories represent the best achievable trajectory given the initial condition. Steps toward a closed loop neural controller with online learning updates are examined. The inner loop of the simulation employs the Program to Optimize Simulated Trajectories (POST) as the basic model, containing baseline dynamics and state generation. This is controlled from a MATLAB shell that directs the optimization, learning, and control strategy. Using mainly bank angle guidance coupled with CI strategies, the set of achievable reference trajectories are shown to be 88% under 10 meters, a significant improvement in the state of the art. Further, the automatic real-time generation of realistic reference trajectories in the presence of unknown initial conditions is shown to have promise. The closed loop CI guidance strategy is outlined. An unexpected advance came from the effort to optimize the optimization, where the PSO algorithm was improved with the capability for tracking a changing error environment.

  7. Phootprint - A Phobos sample return mission study

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Svedhem, Håkan; Rebuffat, Denis

    Introduction ESA is currently studying a mission to return a sample from Phobos, called Phootprint. This study is performed as part of ESA’s Mars Robotic Exploration Programme. Part of the mission goal is to prepare technology needed for a sample return mission from Mars itself; the mission should also have a strong scientific justification, which is described here. 1. Science goal The main science goal of this mission will be to Understand the formation of the Martian moons Phobos and put constraints on the evolution of the solar system. Currently, there are several possibilities for explaining the formation of the Martian moons: (a) co-formation with Mars (b) capture of objects coming close to Mars (c) Impact of a large body onto Mars and formation from the impact ejecta The main science goal of this mission is to find out which of the three scenarios is the most probable one. To do this, samples from Phobos would be returned to Earth and analyzed with extremely high precision in ground-based laboratories. An on-board payload is foreseen to provide information to put the sample into the necessary geological context. 2. Mission Spacecraft and payload will be based on experience gained from previous studies to Martian moons and asteroids. In particular the Marco Polo and MarcoPolo-R asteroid sample return mission studies performed at ESA were used as a starting point. Currently, industrial studies are ongoing. The initial starting assumption was to use a Soyuz launcher. Uunlike the initial Marco Polo and MarcoPolo-R studies to an asteroid, a transfer stage will be needed. Another main difference to an asteroid mission is the fact that the spacecraft actually orbits Mars, not Phobos or Deimos. It is possible to select a spacecraft orbit, which in a Phobos- or Deimos-centred reference system would give an ellipse around the moon. The following model payload is currently foreseen: - Wide Angle Camera, - Narrow Angle Camera, - Close-Up Camera, - Context camera for sampling context, - visible-IR spectrometer - thermal IR spectrometer - and a Radio Science investigation. It is expected that with these instruments the necessary context for the sample can be provided. The paper will focus on the current status of the mission study.

  8. Nuclear Thermal Rocket/Vehicle Characteristics And Sensitivity Trades For NASA's Mars Design Reference Architecture (DRA) 5.0 Study

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; McCurdy, David R.; Packard, Thomas W.

    2009-01-01

    This paper summarizes Phase I and II analysis results from NASA's recent Mars DRA 5.0 study which re-examined mission, payload and transportation system requirements for a human Mars landing mission in the post-2030 timeframe. Nuclear thermal rocket (NTR) propulsion was again identified as the preferred in-space transportation system over chemical/aerobrake because of its higher specific impulse (I(sub sp)) capability, increased tolerance to payload mass growth and architecture changes, and lower total initial mass in low Earth orbit (IMLEO) which is important for reducing the number of Ares-V heavy lift launches and overall mission cost. DRA 5.0 features a long surface stay (approximately 500 days) split mission using separate cargo and crewed Mars transfer vehicles (MTVs). All vehicles utilize a common core propulsion stage with three 25 klbf composite fuel NERVA-derived NTR engines (T(sub ex) approximately 2650 - 2700 K, p(sub ch) approximately 1000 psia, epsilon approximately 300:1, I(sub sp) approximately 900 - 910 s, engine thrust-toweight ratio approximately 3.43) to perform all primary mission maneuvers. Two cargo flights, utilizing 1-way minimum energy trajectories, pre-deploy a cargo lander to the surface and a habitat lander into a 24-hour elliptical Mars parking orbit where it remains until the arrival of the crewed MTV during the next mission opportunity (approximately 26 months later). The cargo payload elements aerocapture (AC) into Mars orbit and are enclosed within a large triconicshaped aeroshell which functions as payload shroud during launch, then as an aerobrake and thermal protection system during Mars orbit capture and subsequent entry, descent and landing (EDL) on Mars. The all propulsive crewed MTV is a 0-gE vehicle design that utilizes a fast conjunction trajectory that allows approximately 6-7 month 1-way transit times to and from Mars. Four 12.5 kW(sub e) per 125 square meter rectangular photovoltaic arrays provide the crewed MTV with approximately 50 kW(sub e) of electrical power in Mars orbit for crew life support and spacecraft subsystem needs. Vehicle assembly involves autonomous Earth orbit rendezvous and docking between the propulsion stages, in-line propellant tanks and payload elements. Nine Ares-V launches -- five for the two cargo MTVs and four for the crewed MTV -- deliver the key components for the three MTVs. Details on mission, payload, engine and vehicle characteristics and requirements are presented and the results of key trade studies are discussed.

  9. Landing Area Narrowed for 2016 InSight Mission to Mars

    NASA Image and Video Library

    2013-09-04

    The process of selecting a site for NASA's next landing on Mars, planned for September 2016, has narrowed to four semifinalist sites located close together in the Elysium Planitia region of Mars. The mission known by the acronym InSight will study the Red Planet's interior, rather than surface features, to advance understanding of the processes that formed and shaped the rocky planets of the inner solar system, including Earth. The location of the cluster of semifinalist landing sites for InSight is indicated on this near-global topographic map of Mars, which also indicates landing sites of current and past NASA missions to the surface of Mars. The mission's full name is Interior Exploration Using Seismic Investigations, Geodesy and Heat Transport. The location of Elysium Planitia close to the Martian equator meets an engineering requirement for the stationary InSight lander to receive adequate solar irradiation year-round on its photovoltaic array. The location also meets an engineering constraint for low elevation, optimizing the amount of atmosphere the spacecraft can use for deceleration during its descent to the surface. The number of candidate landing sites for InSight was trimmed from 22 down to four in August 2013. This down-selection facilitates focusing the efforts to further evaluate the four sites. Cameras on NASA's Mars Reconnaissance Orbiter will be used to gather more information about them before the final selection. The topographic map uses data from the Mars Orbiter Laser Altimeter on NASA's Mars Global Surveyor spacecraft. The color coding on this map indicates elevation relative to a reference datum, since Mars has no "sea level." The lowest elevations are presented as dark blue; the highest as white. The difference between green and orange in the color coding is about 2.5 miles (4 kilometers) vertically. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA17357

  10. Report of the IAU Working Group on Cartographic Coordinates and Rotational Elements: 2009

    DTIC Science & Technology

    2011-01-01

    normal passes through P and by the height (h) of P above P ′. The topographic reference surface of Mars is that specified in the final MOLA Mission...System, MGS-M- MOLA -5-MEG- DR-L3-V1.0, 2003. Available on-line from http://pds-geosciences.wustl.edu/missions/mgs/megdr.html. Accessed 2010 October 18

  11. Workshop on Using In Situ Resources for Construction of Planetary Outposts

    NASA Technical Reports Server (NTRS)

    Duke, Michael B. (Editor)

    1998-01-01

    The workshop examined the potential uses of indigenous materials on the Moon and Mars, other than those associated with the production of propellants for space transportation. The papers presented concerned the needs for construction, based on analysis of the current NASA Mars reference Mission and past studies studies of lunar outposts; the availability of materials on the Moon and Mars; construction techniques that make use of the natural environment; materials production and fabrication techniques based on indigenous materials; and new technologies that could promote the use of indigenous materials in construction.

  12. Power requirements for the first lunar outpost (FLO)

    NASA Technical Reports Server (NTRS)

    Cataldo, Robert L.; Bozek, John M.

    1993-01-01

    NASA's Exploration Program Office is currently developing a preliminary reference mission description that lays the framework from which the nation can return to the Moon by the end of the decade. The First Lunar Outpost is the initial phase of establishing a permanent presence on the Moon and the next step of sending humans to Mars. Many systems required for missions to Mars will be verified on the Moon, while still accomplishing valuable lunar science and in-situ resource utilization (ISRU). Some of FLO's major accomplishments will be long duration habitation, extended surface roving (both piloted and teleoperated) and a suite of science experiments, including lunar resources extraction. Of equal challenge will be to provide long life, reliable power sources to meet the needs of a lunar mission.

  13. Estimated Radiation on Mars, Hits per Cell Nucleus

    NASA Technical Reports Server (NTRS)

    2002-01-01

    This global map of Mars shows estimates for amounts of high-energy-particle cosmic radiation reaching the surface, a serious health concern for any future human exploration of the planet.

    The estimates are based on cosmic-radiation measurements made on the way to Mars by the Mars radiation environment experiment, an instrument on NASA's 2001 Mars Odyssey spacecraft, plus information about Mars' surface elevations from the laser altimeter instrument on NASA's Mars Global Surveyor. The areas of Mars expected to have least radiation are where elevation is lowest, because those areas have more atmosphere above them to block out some of the radiation. Earth's thick atmosphere shields us from most cosmic radiation, but Mars has a much thinner atmosphere than Earth does.

    Colors in the map refer to the estimated average number of times per year each cell nucleus in a human there would be hit by a high-energy cosmic ray particle. The range is generally from two hits (color-coded green), a moderate risk level, to eight hits (coded red), a high risk level.

    NASA's Jet Propulsion Laboratory, Pasadena, Calif. manages the 2001 Mars Odyssey and Mars Global Surveyor missions for NASA's Office of Space Science, Washington D.C. The Mars radiation environment experiment was developed by NASA's Johnson Space Center. Lockheed Martin Astronautics, Denver, is the prime contractor for Odyssey, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  14. Mars Rover Sample Return mission study

    NASA Technical Reports Server (NTRS)

    Bourke, Roger D.

    1989-01-01

    The Mars Rover/Sample Return mission is examined as a precursor to a manned mission to Mars. The value of precursor missions is noted, using the Apollo lunar program as an example. The scientific objectives of the Mars Rover/Sample Return mission are listed and the basic mission plans are described. Consideration is given to the options for mission design, launch configurations, rover construction, and entry and lander design. Also, the potential for international cooperation on the Mars Rover/Sample Return mission is discussed.

  15. Application of Energy Integration Techniques to the Design of Advanced Life Support Systems

    NASA Technical Reports Server (NTRS)

    Levri, Julie; Finn, Cory

    2000-01-01

    Exchanging heat between hot and cold streams within an advanced life support system can save energy. This savings will reduce the equivalent system mass (ESM) of the system. Different system configurations are examined under steady-state conditions for various percentages of food growth and waste treatment. The scenarios investigated represent possible design options for a Mars reference mission. Reference mission definitions are drawn from the ALSS Modeling and Analysis Reference Missions Document, which includes definitions for space station evolution, Mars landers, and a Mars base. For each scenario, streams requiring heating or cooling are identified and characterized by mass flow, supply and target temperatures and heat capacities. The Pinch Technique is applied to identify good matches for energy exchange between the hot and cold streams and to calculate the minimum external heating and cooling requirements for the system. For each pair of hot and cold streams that are matched, there will be a reduction in the amount of external heating and cooling required, and the original heating and cooling equipment will be replaced with a heat exchanger. The net cost savings can be either positive or negative for each stream pairing, and the priority for implementing each pairing can be ranked according to its potential cost savings. Using the Pinch technique, a complete system heat exchange network is developed and heat exchangers are sized to allow for calculation of ESM. The energy-integrated design typically has a lower total ESM than the original design with no energy integration. A comparison of ESM savings in each of the scenarios is made to direct future Pinch Analysis efforts.

  16. Qualification of Engineering Camera for Long-Duration Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Maki, Justin N.; Pourangi, Ali M.; Lee, Steven W.

    2012-01-01

    Qualification and verification of advanced electronic packaging and interconnect technologies, and various other types of hardware elements for the Mars Exploration Rover s Spirit and Opportunity (MER)/Mars Science Laboratory (MSL) flight projects, has been performed to enhance the mission assurance. The qualification of hardware (engineering camera) under extreme cold temperatures has been performed with reference to various Mars-related project requirements. The flight-like packages, sensors, and subassemblies have been selected for the study to survive three times the total number of expected diurnal temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware, including all relevant manufacturing, ground operations, and mission phases. Qualification has been performed by subjecting above flight-like hardware to the environmental temperature extremes, and assessing any structural failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Engineering camera packaging designs, charge-coupled devices (CCDs), and temperature sensors were successfully qualified for MER and MSL per JPL design principles. Package failures were observed during qualification processes and the package redesigns were then made to enhance the reliability and subsequent mission assurance. These results show the technology certainly is promising for MSL, and especially for longterm extreme temperature missions to the extreme temperature conditions. The engineering camera has been completely qualified for the MSL project, with the proven ability to survive on Mars for 2010 sols, or 670 sols times three. Finally, the camera continued to be functional, even after 2010 thermal cycles.

  17. The NASA Mars Conference

    NASA Astrophysics Data System (ADS)

    Reiber, Duke B.

    Papers about Mars and Mars exploration are presented, covering topics such as Martian history, geology, volcanism, channels, moons, atmosphere, meteorology, water on the planet, and the possibility of life. The unmanned exploration of Mars is discussed, including the Phobos Mission, the Mars Observer, the Mars Aeronomy Observer, the seismic network, Mars sample return missions, and the Mars Ball, an inflatable-sectored-tire rover concept. Issues dealing with manned exploration of Mars are examined, such as the reasons for exploring Mars, mission scenarios, a transportation system for routine visits, technologies for Mars expeditions, the human factors for Mars missions, life support systems, living and working on Mars, and the report of the National Commission on Space.

  18. The case for Mars III: Strategies for exploration - General interest and overview

    NASA Technical Reports Server (NTRS)

    Stoker, Carol R. (Editor)

    1989-01-01

    Papers on the possibilities for manned Mars missions are presented, covering topics such as space policy, space education and Mars exploration, economic issues, international cooperation, life support, biomedical factors, human factors, the Mars Rover Sample Return Mission, and possible unmanned precursor missions to Mars. Other topics include the scientific objectives for human exploration of Mars, mission strategies, possible transportation systems for manned Mars flight, advanced propulsion techniques, and the utilization of Mars resources. Additional subjects include the construction and maintenance of a Martian base, possible systems for mobility on the Martian surface, space power systems, and the use of the Space Station for a Mars mission.

  19. Exobiology and Future Mars Missions

    NASA Technical Reports Server (NTRS)

    Mckay, Christopher P. (Editor); Davis, Wanda, L. (Editor)

    1989-01-01

    Scientific questions associated with exobiology on Mars were considered and how these questions should be addressed on future Mars missions was determined. The mission that provided a focus for discussions was the Mars Rover/Sample Return Mission.

  20. Human Mars Mission Design - The Ultimate Systems Challenge

    NASA Technical Reports Server (NTRS)

    Connolly, John F.; Joosten, B. Kent; Drake, Bret; Hoffman, Steve; Polsgrove, Tara; Rucker, Michelle; Andrews, Alida; Williams, Nehemiah

    2017-01-01

    A human mission to Mars will occur at some time in the coming decades. When it does, it will be the end result of a complex network of interconnected design choices, systems analyses, technical optimizations, and non-technical compromises. This mission will extend the technologies, engineering design, and systems analyses to new limits, and may very well be the most complex undertaking in human history. It can be illustrated as a large menu, or as a large decision tree. Whatever the visualization tool, there are numerous design decisions required to assemble a human Mars mission, and many of these interconnect with one another. This paper examines these many decisions and further details a number of choices that are highly interwoven throughout the mission design. The large quantity of variables and their interconnectedness results in a highly complex systems challenge, and the paper illustrates how a change in one variable results in ripples (sometimes unintended) throughout many other facets of the design. The paper concludes with a discussion of some mission design variables that can be addressed first, and those that have already been addressed as a result of ongoing National Aeronautics and Space Administration (NASA) developments, or as a result of decisions outside the technical arena. It advocates the need for a 'reference design' that can be used as a point of comparison, and to illustrate the system-wide impacts as design variables change.

  1. Extensibility of the fission surface power (FSP) system from the moon to Mars

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poston, David Irvin

    2011-01-28

    Fission reactors have great near-term potential to power human and robotic missions/outposts on the surface of the Moon and Mars (and potentially other planets, moons, and asteroids). The ability to provide a power-rich environment that is independent of solar intensity, nights, dust storms, etc., is of significant (perhaps enabling) importance to the further expansion of humans into our solar system. NASA's Reference Fission Surface Power (FSP) System is a 40 kWe system that has been primarily designed for lunar applications. This paper examines the extensibility of the FSP design and technology for potential missions on Mars. Possible impacts include themore » effects of changes in heat sink, gravity, day-night cycles, mission transit time, communication delay, and the chemistry of the regolith and atmosphere. One of the biggest impacts might be differences in the potential utilization of in-situ materials for shielding. Another major factor is that different missions will likely require different performance requirements, e.g. power, lifetime and mass. This paper concludes that the environmental differences between potential mission locations will not require significant changes in design and technologies, unless performance requirements for a specific mission are substantially different than those adopted for the FSP The primary basis for this conclusion is that the FSP has been designed with robust materials and design margins.« less

  2. Planetary protection and Mars: requirements and constraints on the 2016 and 2018 missions, and beyond

    NASA Astrophysics Data System (ADS)

    Rummel, J.; Kminek, G.; Conley, C.

    2011-10-01

    The suite of missions being planned currently by NASA and ESA as a partnership under the name "ExoMars" include an orbiter and an entry, descent, and landing demonstrator module (EDM) for the 2016 "ExoMars Trace Gas Orbiter" mission (ExoMars TGO), as well as a highly capable rover to be launched in 2018 to address the original ExoMars objectives (including the Pasteur payload). This 2018 ExoMars rover is expected to begin a series of missions leading to the first sample return mission from Mars, also conducted jointly between NASA, ESA, and their partners (JMSR). Each of these missions and mission components has a role in enabling future Mars exploration, including the search for life or life-related compounds on Mars, and each of them has the potential to carry confounding biological and organic materials into sensitive environments on Mars. Accordingly, this suite of missions will be subjected to joint planetary protection requirements applied by both ESA and NASA to their respective components, according to the COSPAR-delineated planetary protection policy to protect Mars from contamination, and eventually to provide for the protection of the Earth from potential life returned in a martian sample. This paper will discuss the challenges ahead for mission designers and the mission science teams, and will outline some of the potential pitfalls involved with different mission options.

  3. Mars Trek: An Interactive Web Portal for Current and Future Missions to Mars

    NASA Technical Reports Server (NTRS)

    Law, E.; Day, B.

    2017-01-01

    NASA's Mars Trek (https://marstrek.jpl.nasa.gov) provides a web-based Portal and a suite of interactive visualization and analysis tools to enable mission planners, lunar scientists, and engineers to access mapped data products from past and current missions to Mars. During the past year, the capabilities and data served by Mars Trek have been significantly expanded beyond its original design as a public outreach tool. At the request of NASA's Science Mission Directorate and Human Exploration Operations Mission Directorate, Mars Trek's technology and capabilities are now being extended to support site selection and analysis activities for the first human missions to Mars.

  4. Mars Trek: An Interactive Web Portal for Current and Future Missions to Mars

    NASA Astrophysics Data System (ADS)

    Law, E.; Day, B.

    2017-09-01

    NASA's Mars Trek (https://marstrek.jpl.nasa.gov) provides a web-based Portal and a suite of interactive visualization and analysis tools to enable mission planners, lunar scientists, and engineers to access mapped data products from past and current missions to Mars. During the past year, the capabilities and data served by Mars Trek have been significantly expanded beyond its original design as a public outreach tool. At the request of NASA's Science Mission Directorate and Human Exploration Operations Mission Directorate, Mars Trek's technology and capabilities are now being extended to support site selection and analysis activities for the first human missions to Mars.

  5. Plans and Considerations for the Exploration of Space

    NASA Technical Reports Server (NTRS)

    Derkowski, Brian J.

    2001-01-01

    The Mars Settlement Design Competition is a program for high school students and teachers to experience the process of mission and hardware design. It provides a top level view into how NASA plans to explore space. I will be involved with all three days of this competition. On Friday I plan to give two presentations, one to the employees of White Sands Test Facility and one to students and teachers. On Saturday, I will have a question and answer session with some of the teachers participating in the workshop. Sunday I will serve as one of the judges that will review the students projects created over the weekend. The main emphasis of my talk will focus on exploring the possibilities of the future of space exploration. I will discuss the Mars Reference Mission 3.0, as well as some of the current robotic missions being sent to Mars. Next, I will present a business model perfected by Hum Mandell, showing how the public, private, and commercial sectors all play a major role in sending humans to Mars. I will also discuss the work of the Integrated Design Team at JSC and how that working together approach is key for a successful design. Finally, I will present that the question of how humans can reach out beyond low earth orbit and place permanent settlements on Mars is really a function of the imagination of those who intend on going there.

  6. Engineering-Level Model Atmospheres for Titan and Neptune

    NASA Technical Reports Server (NTRS)

    Justus, C. G.; Duvall, Aleta; Johnson, D. L.

    2003-01-01

    Engineering-level atmospheric models for Titan and Neptune have been developed for use in NASA s systems analysis studies of aerocapture applications in missions to the outer planets. Analogous to highly successful Global Reference Atmospheric Models for Earth (GRAM, Justus et al., 2000) and Mars (Mars-GRAM, Justus and Johnson, 2001, Justus et al., 2002) the new models are called Titan-GRAM and Neptune-GRAM. Like GRAM and Mars-GRAM, an important feature of Titan-GRAM and Neptune-GRAM is their ability to simulate quasi-random perturbations for Monte- Carlo analyses in developing guidance, navigation and control algorithms, and for thermal systems design.

  7. Mars, Phobos, and Deimos Sample Return Enabled by ARRM Alternative Trade Study Spacecraft

    NASA Technical Reports Server (NTRS)

    Englander, Jacob A.; Vavrina, Matthew; Merrill, Raymond G.; Qu, Min; Naasz, Bo J.

    2014-01-01

    The Asteroid Robotic Redirect Mission (ARRM) has been the topic of many mission design studies since 2011. The reference ARRM spacecraft uses a powerful solar electric propulsion (SEP) system and a bag device to capture a small asteroid from an Earth-like orbit and redirect it to a distant retrograde orbit (DRO) around the moon. The ARRM Option B spacecraft uses the same propulsion system and multi-Degree of Freedom (DoF) manipulators device to retrieve a very large sample (thousands of kilograms) from a 100+ meter diameter farther-away Near Earth Asteroid (NEA). This study will demonstrate that the ARRM Option B spacecraft design can also be used to return samples from Mars and its moons - either by acquiring a large rock from the surface of Phobos or Deimos, and or by rendezvousing with a sample-return spacecraft launched from the surface of Mars.

  8. Mars, Phobos, and Deimos Sample Return Enabled by ARRM Alternative Trade Study Spacecraft

    NASA Technical Reports Server (NTRS)

    Englander, Jacob A.; Vavrina, Matthew; Naasz, Bo; Merill, Raymond G.; Qu, Min

    2014-01-01

    The Asteroid Robotic Redirect Mission (ARRM) has been the topic of many mission design studies since 2011. The reference ARRM spacecraft uses a powerful solar electric propulsion (SEP) system and a bag device to capture a small asteroid from an Earth-like orbit and redirect it to a distant retrograde orbit (DRO) around the moon. The ARRM Option B spacecraft uses the same propulsion system and multi-Degree of Freedom (DoF) manipulators device to retrieve a very large sample (thousands of kilograms) from a 100+ meter diameter farther-away Near Earth Asteroid (NEA). This study will demonstrate that the ARRM Option B spacecraft design can also be used to return samples from Mars and its moons - either by acquiring a large rock from the surface of Phobos or Deimos, and/or by rendezvousing with a sample-return spacecraft launched from the surface of Mars.

  9. Low-latency teleoperations, planetary protection, and astrobiology

    NASA Astrophysics Data System (ADS)

    Lupisella, Mark L.

    2018-07-01

    The remote operation of an asset with time-delays short enough to allow for `real-time' or near real-time control - often referred to as low-latency teleoperations (LLT) - has important potential to address planetary protection concerns and to enhance astrobiology exploration. Not only can LLT assist with the search for extraterrestrial life and help mitigate planetary protection concerns as required by international treaty, but it can also aid in the real-time exploration of hazardous areas, robotically manipulate samples in real-time, and engage in precise measurements and experiments without the presence of crew in the immediate area. Furthermore, LLT can be particularly effective for studying `Special Regions' - areas of astrobiological interest that might be adversely affected by forward contamination from humans or spacecraft contaminants during activities on Mars. LLT can also aid human exploration by addressing concerns about backward contamination that could impact mission details for returning Martian samples and crew back to Earth.This paper provides an overview of LLT operational considerations and findings from recent NASA analyses and workshops related to planetary protection and human missions beyond Earth orbit. The paper focuses primarily on three interrelated areas of Mars operations that are particularly relevant to the planetary protection and the search for life: Mars orbit-to-surface LLT activities; Crew-on-surface and drilling LLT; and Mars surface science laboratory LLT. The paper also discusses several additional mission implementation considerations and closes with information on key knowledge gaps identified as necessary for the advance of LLT for planetary protection and astrobiology purposes on future human missions to Mars.

  10. Human Mars Mission Performance Crew Taxi Profile

    NASA Technical Reports Server (NTRS)

    Duaro, Vince A.

    1999-01-01

    Using the results from Integrated Mission Program (IMP), a simulation language and code used to model present and future Earth Moon, or Mars missions, this report presents six different case studies of a manned Mars mission. The mission profiles, timelines, propellant requirements, feasibility and perturbation analysis is presented for two aborted, two delayed rendezvous, and two normal rendezvous cases for a future Mars mission.

  11. Mars integrated transportation system multistage Mars mission

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In accordance with the objective of the Mars Integrated Transport System (MITS) program, the Multistage Mars Mission (MSMM) design team developed a profile for a manned mission to Mars. The purpose of the multistage mission is to send a crew of five astronauts to the martian surface by the year 2019. The mission continues man's eternal quest for exploration of new frontiers. This mission has a scheduled duration of 426 days that includes experimentation en route as well as surface exploration and experimentation. The MSMM is also designed as a foundation for a continuing program leading to the colonization of the planet Mars.

  12. Qualification Testing of Engineering Camera and Platinum Resistance Thermometer (PRT) Sensors for Mars Science Laboratory (MSL) Project under Extreme Temperatures to Assess Reliability and to Enhance Mission Assurance

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni; Maki, Justin N.; Cucullu, Gordon C.

    2008-01-01

    Package Qualification and Verification (PQV) of advanced electronic packaging and interconnect technologies and various other types of qualification hardware for the Mars Exploration Rover/Mars Science Laboratory flight projects has been performed to enhance the mission assurance. The qualification of hardware (Engineering Camera and Platinum Resistance Thermometer, PRT) under extreme cold temperatures has been performed with reference to various project requirements. The flight-like packages, sensors, and subassemblies have been selected for the study to survive three times (3x) the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations and mission phases. Qualification has been performed by subjecting above flight-like qual hardware to the environmental temperature extremes and assessing any structural failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experiments of flight like hardware qualification test results have been described in this paper.

  13. critcial human health issues in connection with future human missions to mMars: the HUMEX study of ESA

    NASA Astrophysics Data System (ADS)

    Horneck, G.; Humex Team

    ESA has recently initiated a study of the human responses, limits and needs with regard to the stress environments of interplanetary and planetary missions. Emphasis was laid on human health and performance care as well as Advanced Life Support Developments including Bioregenerative Life Support Systems and environmental monitoring. The overall study goals were as follows: (i) to define reference scenarios for a European participation in human exploration and to estimate their influence on the Life Sciences and Life Support requirements; (ii) for selected mission scenarios, to critically assess the limiting factors for human health, wellbeing, and performance and to recommend relevant countermeasures; (iii) for selected mission scenarios, to critically assess the potential of Advanced Life Support Developments and to pro-pose a European strategy including terrestrial applications; (iv) to critically assess the feasibility of existing facilities and technologies on ground and in space as test-beds in preparation for human exploratory missions and to develop a test plan for ground and ISS campaigns; (v) to develop a roadmap for a future European strategy towards human exploratory missions, including preparatory activities and terrestrial applications and benefits. Two scenarios for a Mars mission were selected: (i) with a 30 days stay on Mars, and (ii) with about 500 days stay on Mars. The impact on human health, perform-ance and well being has been investigated from the view point of (i) the effects of microgravity (during space travel), reduced gravity (on Mars) and abrupt gravity changes (during launch and landing), (ii) the effects of cosmic radiation including solar particle events, (iii) psychological issues as well as general health care. Coun-termeasures as well as necessary research using ground-based testbeds and/or the ISS have been defined. The need for highly intelligent autonomous diagnostic and therapy systems was emphasized. Advanced life support systems with a high degree of autonomy and regenerative capacity and synergy effects were considered where bioregenerative life support systems and biodiagnostic systems become essential especially for the long-term Mars scenario. The considerations have been incorpo-rated into a roadmap for a future European strategy in human health issues for a potential European participation in a cooperative international exploration of our solar system by humans. Ref. Horneck et al, 2003, HUMEX, study on the Survivability and Adaptation of Humans to Long-Duration Exploratory Missions, ESA SP 1264

  14. Mars scouts: an overview

    NASA Technical Reports Server (NTRS)

    Matousek, S.

    2001-01-01

    The Mars program institutes the Mars Scout Missions in order to address science goals in the program not otherwise covered in the baseline Mars plan. Mars Scout Missions will be Principle-Investigator (PI) led science missions. Analogous to the Discovery Program, PI led investigations optimize the use of limited resources to accomplish the best focused science and allow the flexibility to quickly respond to discoveries at Mars. Scout missions also require unique investments in technology and reliance upon Mars-based infrastructure such as telecom relay orbiters.

  15. Soil simulant sourcing for the ExoMars rover testbed

    NASA Astrophysics Data System (ADS)

    Gouache, Thibault P.; Patel, Nildeep; Brunskill, Christopher; Scott, Gregory P.; Saaj, Chakravarthini M.; Matthews, Marcus; Cui, Liang

    2011-06-01

    ExoMars is the European Space Agency (ESA) mission to Mars planned for launch in 2018, focusing on exobiology with the primary objective of searching for any traces of extant or extinct carbon-based micro-organisms. The on-surface mission is performed by a near-autonomous mobile robotic vehicle (also referred to as the rover) with a mission design life of 180 sols (Patel et al., 2010). In order to obtain useful data on the tractive performance of the ExoMars rover before flight, it is necessary to perform mobility tests on representative soil simulant materials producing a Martian terrain analogue under terrestrial laboratory conditions. Three individual types of regolith shown to be found extensively on the Martian surface were identified for replication using commercially available terrestrial materials, sourced from UK sites in order to ensure easy supply and reduce lead times for delivery. These materials (also referred to as the Engineering Soil (ES-x) simulants) are: a fine dust analogue (ES-1); a fine aeolian sand analogue (ES-2); and a coarse sand analogue (ES-3). Following a detailed analysis, three fine sand regolith types were identified from commercially available products. Each material was used in its off-the-shelf state, except for ES-2, where further processing methods were used to reduce the particle size range. These materials were tested to determine their physical characteristics, including the particle size distribution, particle density, particle shape (including angularity/sphericity) and moisture content. The results are analysed to allow comparative analysis with existing soil simulants and the published results regarding in situ analysis of Martian soil on previous NASA (National Aeronautics and Space Administration) missions. The findings have shown that in some cases material properties vary significantly from the specifications provided by material suppliers. This has confirmed the need for laboratory testing to determine the actual parameters to prove that standard geotechnical processes are indeed suitable. The outcomes have allowed the confirmation of each simulant material as suitable for replicating their respective regolith types.

  16. Human Exploration of Earth's Neighborhood and Mars

    NASA Technical Reports Server (NTRS)

    Condon, Gerald

    2003-01-01

    The presentation examines Mars landing scenarios, Earth to Moon transfers comparing direct vs. via libration points. Lunar transfer/orbit diagrams, comparison of opposition class and conjunction class missions, and artificial gravity for human exploration missions. Slides related to Mars landing scenarios include: mission scenario; direct entry landing locations; 2005 opportunity - Type 1; Earth-mars superior conjunction; Lander latitude accessibility; Low thrust - Earth return phase; SEP Earth return sequence; Missions - 200, 2007, 2009; and Mission map. Slides related to Earth to Moon transfers (direct vs. via libration points (L1, L2) include libration point missions, expeditionary vs. evolutionary, Earth-Moon L1 - gateway for lunar surface operations, and Lunar mission libration point vs. lunar orbit rendezvous (LOR). Slides related to lunar transfer/orbit diagrams include: trans-lunar trajectory from ISS parking orbit, trans-Earth trajectories, parking orbit considerations, and landing latitude restrictions. Slides related to comparison of opposition class (short-stay) and conjunction class (long-stay) missions for human exploration of Mars include: Mars mission planning, Earth-Mars orbital characteristics, delta-V variations, and Mars mission duration comparison. Slides related to artificial gravity for human exploration missions include: current configuration, NEP thruster location trades, minor axis rotation, and example load paths.

  17. The conceptual design of a hybrid life support system based on the evaluation and comparison of terrestrial testbeds

    NASA Astrophysics Data System (ADS)

    Czupalla, M.; Horneck, G.; Blome, H. J.

    This report summarizes a trade study of different options of a bioregenerative Life Support System (LSS) and a subsequent conceptual design of a hybrid LSS. The evaluation was based mainly on the terrestrial testbed projects MELISSA (ESA) and BIOS (Russia). In addition, some methods suggested by the Advanced Life Support Project (NASA) were considered. Computer models, including mass flows were established for each of the systems with the goal of closing system loops to the extent possible. In order to cope with the differences in the supported crew size and provided nutrition, all systems were scaled for supporting a crew of six for a 780 day Mars mission (180 days transport to Mars; 600 days surface period) as given in the NASA Design Reference Mission Scenario [Hoffman, S.J., Kaplan, D.L. Human exploration of Mars: the Reference Mission of the NASA Mars Exploratory Study, 1997]. All models were scaled to provide the same daily allowances, as of calories, to the crew. Equivalent System Mass (ESM) analysis was used to compare the investigated system models against each other. Following the comparison of the terrestrial systems, the system specific subsystem options for Food Supply, Solid Waste Processing, Water Management and Atmosphere Revitalization were evaluated in a separate trade study. The best subsystem technologies from the trade study were integrated into an overall design solution based on mass flow relationships. The optimized LSS is mainly a bioregenerative system, complemented by a few physico-chemical elements, with a total ESM of 18,088 kg, which is about 4 times higher than that of a pure physico-chemical LSS, as designed in an earlier study.

  18. The conceptual design of a hybrid life support system based on the evaluation and comparison of terrestrial testbeds.

    PubMed

    Czupalla, M; Horneck, G; Blome, H J

    2005-01-01

    This report summarizes a trade study of different options of a bioregenerative Life Support System (LSS) and a subsequent conceptual design of a hybrid LSS. The evaluation was based mainly on the terrestrial testbed projects MELISSA (ESA) and BIOS (Russia). In addition, some methods suggested by the Advanced Life Support Project (NASA) were considered. Computer models, including mass flows were established for each of the systems with the goal of closing system loops to the extent possible. In order to cope with the differences in the supported crew size and provided nutrition, all systems were scaled for supporting a crew of six for a 780 day Mars mission (180 days transport to Mars; 600 days surface period) as given in the NASA Design Reference Mission Scenario [Hoffman, S.J., Kaplan, D.L. Human exploration of Mars: the Reference Mission of the NASA Mars Exploratory Study, 1997]. All models were scaled to provide the same daily allowances, as of calories, to the crew. Equivalent System Mass (ESM) analysis was used to compare the investigated system models against each other. Following the comparison of the terrestrial systems, the system specific subsystem options for Food Supply, Solid Waste Processing, Water Management and Atmosphere Revitalization were evaluated in a separate trade study. The best subsystem technologies from the trade study were integrated into an overall design solution based on mass flow relationships. The optimized LSS is mainly a bioregenerative system, complemented by a few physico-chemical elements, with a total ESM of 18,088 kg, which is about 4 times higher than that of a pure physico-chemical LSS, as designed in an earlier study. c2005 COSPAR. Published by Elsevier Ltd. All rights reserved.

  19. Full-Frame Reference for Test Photo of Moon

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This pair of views shows how little of the full image frame was taken up by the Moon in test images taken Sept. 8, 2005, by the High Resolution Imaging Science Experiment (HiRISE) camera on NASA's Mars Reconnaissance Orbiter. The Mars-bound camera imaged Earth's Moon from a distance of about 10 million kilometers (6 million miles) away -- 26 times the distance between Earth and the Moon -- as part of an activity to test and calibrate the camera. The images are very significant because they show that the Mars Reconnaissance Orbiter spacecraft and this camera can properly operate together to collect very high-resolution images of Mars. The target must move through the camera's telescope view in just the right direction and speed to acquire a proper image. The day's test images also demonstrate that the focus mechanism works properly with the telescope to produce sharp images.

    Out of the 20,000-pixel-by-6,000-pixel full frame, the Moon's diameter is about 340 pixels, if the full Moon could be seen. The illuminated crescent is about 60 pixels wide, and the resolution is about 10 kilometers (6 miles) per pixel. At Mars, the entire image region will be filled with high-resolution information.

    The Mars Reconnaissance Orbiter, launched on Aug. 12, 2005, is on course to reach Mars on March 10, 2006. After gradually adjusting the shape of its orbit for half a year, it will begin its primary science phase in November 2006. From the mission's planned science orbit about 300 kilometers (186 miles) above the surface of Mars, the high resolution camera will be able to discern features as small as one meter or yard across.

    The Mars Reconnaissance Orbiter mission is managed by NASA's Jet Propulsion Laboratory, a division of the California Institute of Technology, Pasadena, for the NASA Science Mission Directorate. Lockheed Martin Space Systems, Denver, prime contractor for the project, built the spacecraft. Ball Aerospace & Technologies Corp., Boulder, Colo., built the High Resolution Imaging Science Experiment instrument for the University of Arizona, Tucson, to provide to the mission. The HiRISE Operations Center at the University of Arizona processes images from the camera.

  20. Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

    NASA Technical Reports Server (NTRS)

    Hunt, Charles D.; vanPelt, Michel O.

    2004-01-01

    To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

  1. A Combined Solar Electric and Storable Chemical Propulsion Vehicle for Piloted Mars Missions

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Oleson, Steven R.; Drake, Bret G.

    2014-01-01

    The Mars Design Reference Architecture (DRA) 5.0 explored a piloted Mars mission in the 2030 timeframe, focusing on architecture and technology choices. The DRA 5.0 focused on nuclear thermal and cryogenic chemical propulsion system options for the mission. Follow-on work explored both nuclear and solar electric options. One enticing option that was found in a NASA Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) design study used a combination of a 1-MW-class solar electric propulsion (SEP) system combined with storable chemical systems derived from the planned Orion crew vehicle. It was found that by using each propulsion system at the appropriate phase of the mission, the entire SEP stage and habitat could be placed into orbit with just two planned Space Launch System (SLS) heavy lift launch vehicles assuming the crew would meet up at the Earth-Moon (E-M) L2 point on a separate heavy-lift launch. These appropriate phases use high-thrust chemical propulsion only in gravity wells when the vehicle is piloted and solar electric propulsion for every other phase. Thus the SEP system performs the spiral of the unmanned vehicle from low Earth orbit (LEO) to E-M L2 where the vehicle meets up with the multi-purpose crew vehicle. From here SEP is used to place the vehicle on a trajectory to Mars. With SEP providing a large portion of the required capture and departure changes in velocity (delta V) at Mars, the delta V provided by the chemical propulsion is reduced by a factor of five from what would be needed with chemical propulsion alone at Mars. This trajectory also allows the SEP and habitat vehicle to arrive in the highly elliptic 1-sol parking orbit compatible with envisioned Mars landing concepts. This paper explores mission options using between SEP and chemical propulsion, the design of the SEP system including the solar array and electric propulsion systems, and packaging in the SLS shroud. Design trades of stay time, power level, specific impulse and propellant type are discussed.

  2. A Combined Solar Electric and Storable Chemical Propulsion Vehicle for Piloted Mars Missions

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Oleson, Steven R.; Drake, Bret

    2013-01-01

    The Mars Design Reference Architecture (DRA) 5.0 explored a piloted Mars mission in the 2030 timeframe, focusing on architecture and technology choices. The DRA 5.0 focused on nuclear thermal and cryogenic chemical propulsion system options for the mission. Follow-on work explored both nuclear and solar electric options. One enticing option that was found in a NASA Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) design study used a combination of a 1-MW-class solar electric propulsion (SEP) system combined with storable chemical systems derived from the planned Orion crew vehicle. It was found that by using each propulsion system at the appropriate phase of the mission, the entire SEP stage and habitat could be placed into orbit with just two planned Space Launch System (SLS) heavy lift launch vehicles assuming the crew would meet up at the Earth-Moon (E-M) L2 point on a separate heavy-lift launch. These appropriate phases use high-thrust chemical propulsion only in gravity wells when the vehicle is piloted and solar electric propulsion for every other phase. Thus the SEP system performs the spiral of the unmanned vehicle from low Earth orbit (LEO) to E-M L2 where the vehicle meets up with the multi-purpose crew vehicle. From here SEP is used to place the vehicle on a trajectory to Mars. With SEP providing a large portion of the required capture and departure changes in velocity (delta V) at Mars, the delta V provided by the chemical propulsion is reduced by a factor of five from what would be needed with chemical propulsion alone at Mars. This trajectory also allows the SEP and habitat vehicle to arrive in the highly elliptic 1-sol parking orbit compatible with envisioned Mars landing concepts. This paper explores mission options using between SEP and chemical propulsion, the design of the SEP system including the solar array and electric propulsion systems, and packaging in the SLS shroud. Design trades of stay time, power level, specific impulse and propellant type are discussed.

  3. A method to evaluate utility for architectural comparisons for a campaign to explore the surface of Mars

    NASA Astrophysics Data System (ADS)

    Ward, Eric D.; Webb, Ryan R.; deWeck, Olivier L.

    2016-11-01

    There is a general consensus that Mars is the next high priority destination for human space exploration. There has been no lack of analysis and recommendations for human missions to Mars, including, for example, the NASA Design Reference Architectures and the Mars Direct proposal. These studies and others usually employ the traditional approach of selecting a baseline mission architecture and running individual trade studies. However, this can cause blind spots, as not all combinations are explored. An alternative approach is to holistically analyze the entire architectural trade-space such that all of the possible system interactions are identified and measured. In such a framework, an optimal design is sought by minimizing cost for maximal value. While cost is relatively easy to model for manned spaceflight, value is more difficult to define. In our efforts to develop a surface base architecture for the MIT Mars 2040 project, we explored several methods for quantifying value, including technology development benefits, challenge, and various metrics for measuring scientific return. We developed a science multi-score method that combines astrobiology and geologic research goals, which is weighted by the crew-member hours that can be used for scientific research rather than other activities.

  4. Adaptable Deployable Entry & Placement Technology (ADEPT) for Cubesat Delivery to Mars Surface

    NASA Technical Reports Server (NTRS)

    Wercinski, Paul

    2014-01-01

    The Adaptable, Deployable Entry and Placement Technology (ADEPT), uses a mechanical skeleton to deploy a revolutionary carbon fabric system that serves as both heat shield and primary structure during atmospheric entry. The NASA ADEPT project, currently funded by the Game Changing Development Program in STMD is currently focused on 1m class hypersonic decelerators for the delivery of very small payloads ( 5 kg) to locations of interest in an effort to leverage low-cost platforms to rapidly mature the technology while simultaneously delivering high-value science. Preliminary mission design and aerothermal performance testing in arcjets have shown the ADEPT system is quite capable of safe delivery of cubesats to Mars surface. The ability of the ADEPT to transit to Mars in a stowed configuration (similar to an umbrella) provides options for integration with the Mars 2020 cruise stage, even to consider multiple ADEPTs. System-level test campaigns are underway for FY15 execution or planning for FY16. These include deployment testing, wind tunnel testing, system-level arc jet testing, and a sounding rocket flight test. The goal is system level maturation (TRL 6) at a 1m class Mars design reference mission configuration.

  5. Mars Exploration Rovers: 4 Years on Mars

    NASA Technical Reports Server (NTRS)

    Landis, Geoffrey A.

    2008-01-01

    This January, the Mars Exploration Rovers "Spirit" and "Opportunity" are starting their fifth year of exploring the surface of Mars, well over ten times their nominal 90-day design lifetime. This lecture discusses the Mars Exploration Rovers, presents the current mission status for the extended mission, some of the most results from the mission and how it is affecting our current view of Mars, and briefly presents the plans for the coming NASA missions to the surface of Mars and concepts for exploration with robots and humans into the next decade, and beyond.

  6. Human friendly architectural design for a small Martian base

    NASA Astrophysics Data System (ADS)

    Kozicki, J.; Kozicka, J.

    2011-12-01

    The manned mission to Mars is expected to last almost three years. A human factor must be taken seriously into account in such a long-term mission. A big comfortable habitat can help to overcome sociopsychological problems, that occur in ICEs (Isolated and Confined Environments). Authors have come forward to this issue and have developed a Martian base design as a human friendly habitat. The project is based on researches of extreme conditions on Mars, architecture in ICEs and contemporary building technologies. The base consists of five modules: a Central Module (CM), an Agriculture Dome (AD), a Residential Dome (RD), a Laboratory Dome (LD) and a Garage (G). Each element has its own functional purpose. The CM is a metal capsule similar to the Reference Mission module (RM, NASA, 1997). Domes are inflatable multilayer structures, which interiors are "open planned". Interiors can be arranged and divided into rooms by using modular partition walls designed by authors.

  7. The CanMars Analogue Mission: Lessons Learned for Mars Sample Return

    NASA Astrophysics Data System (ADS)

    Osinski, G. R.; Beaty, D.; Battler, M.; Caudill, C.; Francis, R.; Haltigin, T.; Hipkin, V.; Pilles, E.

    2018-04-01

    We present an overview and lessons learned for Mars Sample Return from CanMars — an analogue mission that simulated a Mars 2020-like cache mission. Data from 39 sols of operations conducted in the Utah desert in 2015 and 2016 are presented.

  8. Science Enhancements by the MAVEN Participating Scientists

    NASA Technical Reports Server (NTRS)

    Grebowsky, J.; Fast, K.; Talaat, E.; Combi, M.; Crary, F.; England, S.; Ma, Y.; Mendillo, M.; Rosenblatt, P.; Seki, K.

    2014-01-01

    NASA implemented a Participating Scientist Program and released a solicitation for the Mars Atmosphere and Volatile EvolutioN mission (MAVEN) proposals on February 14, 2013. After a NASA peer review panel evaluated the proposals, NASA Headquarters selected nine on June 12, 2013. The program's intent is to enhance the science return from the mission by including new investigations that broaden and/or complement the baseline investigations, while still addressing key science goals. The selections cover a broad range of science investigations. Included are: a patching of a 3D exosphere model to an improved global ionosphere-thermosphere model to study the generation of the exosphere and calculate the escape rates; the addition of a focused study of upper atmosphere variability and waves; improvement of a multi-fluid magnetohydrodynamic model that will be adjusted according to MAVEN observations to enhance the understanding of the solar-wind plasma interaction; a global study of the state of the ionosphere; folding MAVEN measurements into the Mars International Reference Ionosphere under development; quantification of atmospheric loss by pick-up using ion cyclotron wave observations; the reconciliation of remote and in situ observations of the upper atmosphere; the application of precise orbit determination of the spacecraft to measure upper atmospheric density and in conjunction with other Mars missions improve the static gravity field model of Mars; and an integrated ion/neutral study of ionospheric flows and resultant heavy ion escape. Descriptions of each of these investigations are given showing how each adds to and fits seamlessly into MAVEN mission science design.

  9. Science Enhancements by the MAVEN Participating Scientists

    NASA Astrophysics Data System (ADS)

    Grebowsky, J.; Fast, K.; Talaat, E.; Combi, M.; Crary, F.; England, S.; Ma, Y.; Mendillo, M.; Rosenblatt, P.; Seki, K.; Stevens, M.; Withers, P.

    2015-12-01

    NASA implemented a Participating Scientist Program and released a solicitation for the Mars Atmosphere and Volatile EvolutioN mission (MAVEN) proposals on February 14, 2013. After a NASA peer review panel evaluated the proposals, NASA Headquarters selected nine on June 12, 2013. The program's intent is to enhance the science return from the mission by including new investigations that broaden and/or complement the baseline investigations, while still addressing key science goals. The selections cover a broad range of science investigations. Included are: a patching of a 3D exosphere model to an improved global ionosphere-thermosphere model to study the generation of the exosphere and calculate the escape rates; the addition of a focused study of upper atmosphere variability and waves; improvement of a multi-fluid magnetohydrodynamic model that will be adjusted according to MAVEN observations to enhance the understanding of the solar-wind plasma interaction; a global study of the state of the ionosphere; folding MAVEN measurements into the Mars International Reference Ionosphere under development; quantification of atmospheric loss by pick-up using ion cyclotron wave observations; the reconciliation of remote and in situ observations of the upper atmosphere; the application of precise orbit determination of the spacecraft to measure upper atmospheric density and in conjunction with other Mars missions improve the static gravity field model of Mars; and an integrated ion/neutral study of ionospheric flows and resultant heavy ion escape. Descriptions of each of these investigations are given showing how each adds to and fits seamlessly into MAVEN mission science design.

  10. Universe exploration vision

    NASA Technical Reports Server (NTRS)

    O'Handley, D.; Swan, P.; Sadeh, W.

    1992-01-01

    U.S. space policy is discussed in terms of present and planned activities in the solar system and beyond to develop a concept for expanding space travel. The history of space exploration is briefly reviewed with references to the Mariner II, Apollo, and Discoverer programs. Attention is given to the issues related to return trips to the moon, sprint vs repetitive missions to Mars, and the implications of propulsion needs. The concept of terraforming other bodies within the solar system so that they can support human activity is identified as the next major phase of exploration. The following phase is considered to be the use of robotic or manned missions that extend beyond the solar system. Reference is given to a proposed Thousand Astronomical Units mission as a precursor to exploratory expansion into the universe, and current robotic mission activities are mentioned.

  11. Wind-Driven Wireless Networked System of Mobile Sensors for Mars Exploration

    NASA Technical Reports Server (NTRS)

    Davoodi, Faranak; Murphy, Neil

    2013-01-01

    A revolutionary way is proposed of studying the surface of Mars using a wind-driven network of mobile sensors: GOWON. GOWON would be a scalable, self-powered and autonomous distributed system that could allow in situ mapping of a wide range of environmental phenomena in a much larger portion of the surface of Mars compared to earlier missions. It could improve the possibility of finding rare phenomena such as "blueberries' or bio-signatures and mapping their occurrence, through random wind-driven search. It would explore difficult terrains that were beyond the reach of previous missions, such as regions with very steep slopes and cluttered surfaces. GOWON has a potentially long life span, as individual elements can be added to the array periodically. It could potentially provide a cost-effective solution for mapping wide areas of Martian terrain, enabling leaving a long-lasting sensing and searching infrastructure on the surface of Mars. The system proposed here addresses this opportunity using technology advances in a distributed system of wind-driven sensors, referred to as Moballs.

  12. Technology Development for NASA Mars Missions

    NASA Technical Reports Server (NTRS)

    Hayati, Samad

    2005-01-01

    A viewgraph presentation on technology development for NASA Mars Missions is shown. The topics include: 1) Mars mission roadmaps; 2) Focus and Base Technology programs; 3) Technology Infusion; and 4) Feed Forward to Future Missions.

  13. Anomaly Trends for Missions to Mars: Mars Global Surveyor and Mars Odyssey

    NASA Technical Reports Server (NTRS)

    Green, Nelson W.; Hoffman, Alan R.

    2008-01-01

    The long term flight operations of the Mars Global Surveyor and Mars Odyssey spacecraft give us an excellent chance to examine the operations of two long lived spacecraft in orbit around Mars during overlapping time periods. This study examined the anomalies for each mission maintained for NASA at the Jet Propulsion Laboratory. By examining the anomalies each mission encountered during their multiyear missions, trends were identified related to when anomalies occurred during each mission, the types of anomalies encountered, and corrective actions taken to mitigate the effects of the anomalies. As has been discovered in previous studies the numbers of anomalies directly correlate with mission activity and show a decreasing trend with elapsed mission time. Trend analysis also identified a heavy emphasis on software as the source or solution to anomalies for both missions.

  14. Mars Global Reference Atmospheric Model (Mars-GRAM) and Database for Mission Design

    NASA Technical Reports Server (NTRS)

    Justus, C. G.; Duvall, Aleta; Johnson, D. L.

    2003-01-01

    Mars Global Reference Atmospheric Model (Mars-GRAM 2001) is an engineering-level Mars atmosphere model widely used for many Mars mission applications. From 0-80 km, it is based on NASA Ames Mars General Circulation Model, while above 80 km it is based on Mars Thermospheric General Circulation Model. Mars-GRAM 2001 and MGCM use surface topography from Mars Global Surveyor Mars Orbiting Laser Altimeter. Validation studies are described comparing Mars-GRAM with Mars Global Surveyor Radio Science and Thermal Emission Spectrometer data. RS data from 2480 profiles were used, covering latitudes 75 deg S to 72 deg N, surface to approximately 40 km, for seasons ranging from areocentric longitude of Sun (Ls) = 70-160 deg and 265-310 deg. RS data spanned a range of local times, mostly 0-9 hours and 18-24 hours. For interests in aerocapture and precision landing, comparisons concentrated on atmospheric density. At a fixed height of 20 km, RS density varied by about a factor of 2.5 over ranges of latitudes and Ls values observed. Evaluated at matching positions and times, these figures show average RSMars-GRAM density ratios were generally 1+/-)0.05, except at heights above approximately 25 km and latitudes above approximately 50 deg N. Average standard deviation of RSMars-GRAM density ratio was 6%. TES data were used covering surface to approximately 40 km, over more than a full Mars year (February, 1999 - June, 2001, just before start of a Mars global dust storm). Depending on season, TES data covered latitudes 85 deg S to 85 deg N. Most TES data were concentrated near local times 2 hours and 14 hours. Observed average TES/Mars-GRAM density ratios were generally 1+/-0.05, except at high altitudes (15-30 km, depending on season) and high latitudes (greater than 45 deg N), or at most altitudes in the southern hemisphere at Ls approximately 90 and 180 deg. Compared to TES averages for a given latitude and season, TES data had average density standard deviation about the mean of approximately 2.5% for all data, or approximately 1-4%, depending on time of day and dust optical depth. Average standard deviation of TES/Mars-GRAM density ratio was 8.9% for local time 2 hours and 7.1% for local time 14 hours. Thus standard deviation of observed TES/Mars-GRAM density ratio, evaluated at matching positions and times, is about three times the standard deviation of TES data about the TES mean value at a given position and season.

  15. Risk analysis of earth return options for the Mars rover/sample return mission

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Four options for return of a Mars surface sample to Earth were studied to estimate the risk of mission failure and the risk of a sample container breach that might result in the release of Martian life forms, should such exist, in the Earth's biosphere. The probabilities calculated refer only to the time period from the last midcourse correction burn to possession of the sample on Earth. Two extreme views characterize this subject. In one view, there is no life on Mars, therefore there is no significant risk and no serious effort is required to deal with back contamination. In the other view, public safety overrides any desire to return Martian samples, and any risk of damaging contamination greater than zero is unacceptable. Zero risk requires great expense to achieve and may prevent the mission as currently envisioned from taking place. The major conclusion is that risk of sample container breach can be reduced to a very low number within the framework of the mission as now envisioned, but significant expense and effort, above that currently planned is needed. There are benefits to the public that warrant some risk. Martian life, if it exists, will be a major discovery. If it does not, there is no risk.

  16. Joint Inversion and Forward Modeling of Gravity and Magnetic Data in the Ismenius Region of Mars

    NASA Technical Reports Server (NTRS)

    Milbury, C. A.; Raymond, C. A.; Jewell, J. B.; Smrekar, S. E.; Schubert, G.

    2005-01-01

    The unexpected discovery of remanent crustal magnetism on Mars was one of the most intriguing results from the Mars Global Surveyor mission. The origin of the pattern of magnetization remains elusive. Correlations with gravity and geology have been examined to better understand the nature of the magnetic anomalies. In the area of the Martian dichotomy between 50 and 90 degrees E (here referred to as the Ismenius Area), we find that both the Bouguer and the isostatic gravity anomalies appear to correlate with the magnetic anomalies and a buried fault, and allow for a better constraint on the magnetized crust].

  17. The Mars Telecommunications Orbiter a key asset in the Mars Network

    NASA Technical Reports Server (NTRS)

    Abilleira, Fernando

    2006-01-01

    The Mars Telecommunications Orbiter (MTO) to be launched in 2009 will play a key role in the Mars Network since it will be the first interplanetary mission whose primary objective is to provide communications to existing and upcoming Mars missions, This paper presents a basic description of the primary mission an provides trajectory information for the Mars Telecommunication Orbiter.

  18. Mars scientific investigations as a precursor for human exploration.

    PubMed

    Ahlf, P; Cantwell, E; Ostrach, L; Pline, A

    2000-01-01

    In the past two years, NASA has begun to develop and implement plans for investigations on robotic Mars missions which are focused toward returning data critical for planning human missions to Mars. The Mars Surveyor Program 2001 Orbiter and Lander missions will mark the first time that experiments dedicated to preparation for human exploration will be carried out. Investigations on these missions and future missions range from characterization of the physical and chemical environment of Mars, to predicting the response of biology to the Mars environment. Planning for such missions must take into account existing data from previous Mars missions which were not necessarily focused on human exploration preparation. At the same time, plans for near term missions by the international community must be considered to avoid duplication of effort. This paper reviews data requirements for human exploration and applicability of existing data. It will also describe current plans for investigations and place them within the context of related international activities. c 2000 International Astronautical Federation. Published by Elsevier Science Ltd. All rights reserved.

  19. Phoenix--the first Mars Scout mission.

    PubMed

    Shotwell, Robert

    2005-01-01

    NASA has initiated the first of a new series of missions to augment the current Mars Program. In addition to the systematic series of planned, directed missions currently comprising the Mars Program plan, NASA has started a series of Mars Scout missions that are low cost, price fixed, Principal [correction of Principle] Investigator-led projects. These missions are intended to provide an avenue for rapid response to discoveries made as a result of the primary Mars missions, as well as allow more risky technologies and approaches to be applied in the investigation of Mars. The first in this new series is the Phoenix mission which was selected as part of a highly competitive process. Phoenix will use the Mars 2001 Lander that was discontinued in 2000 and apply a new set of science objectives and mission objectives and will validate this soft lander architecture for future applications. This paper will provide an overview of both the Program and the Project. c2005 Elsevier Ltd. All rights reserved.

  20. Mars scientific investigations as a precursor for human exploration

    NASA Technical Reports Server (NTRS)

    Ahlf, P.; Cantwell, E.; Ostrach, L.; Pline, A.

    2000-01-01

    In the past two years, NASA has begun to develop and implement plans for investigations on robotic Mars missions which are focused toward returning data critical for planning human missions to Mars. The Mars Surveyor Program 2001 Orbiter and Lander missions will mark the first time that experiments dedicated to preparation for human exploration will be carried out. Investigations on these missions and future missions range from characterization of the physical and chemical environment of Mars, to predicting the response of biology to the Mars environment. Planning for such missions must take into account existing data from previous Mars missions which were not necessarily focused on human exploration preparation. At the same time, plans for near term missions by the international community must be considered to avoid duplication of effort. This paper reviews data requirements for human exploration and applicability of existing data. It will also describe current plans for investigations and place them within the context of related international activities. c 2000 International Astronautical Federation. Published by Elsevier Science Ltd. All rights reserved.

  1. Nuclear Thermal Rocket (Ntr) Propulsion: A Proven Game-Changing Technology for Future Human Exploration Missions

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; McCurdy, David R.; Packard, Thomas W.

    2012-01-01

    The NTR represents the next evolutionary step in high performance rocket propulsion. It generates high thrust and has a specific impulse (Isp) of approx.900 seconds (s) or more V twice that of today s best chemical rockets. The technology is also proven. During the previous Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) nuclear rocket programs, 20 rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability V all the requirements needed for a human mission to Mars. Ceramic metal cermet fuel was also pursued, as a backup option. The NTR also has significant growth and evolution potential. Configured as a bimodal system, it can generate electrical power for the spacecraft. Adding an oxygen afterburner nozzle introduces a variable thrust and Isp capability and allows bipropellant operation. In NASA s recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower launch mass, simple assembly and mission operations. In contrast to other advanced propulsion options, NTP requires no large technology scale-ups. In fact, the smallest engine tested during the Rover program V the 25,000 lbf (25 klbf) Pewee engine is sufficient for human Mars missions when used in a clustered engine arrangement. The Copernicus crewed spacecraft design developed in DRA 5.0 has significant capability and a human exploration strategy is outlined here that uses Copernicus and its key components for precursor near Earth asteroid (NEA) and Mars orbital missions prior to a Mars landing mission. Initially, the basic Copernicus vehicle can enable reusable 1-year round trip human missions to candidate NEAs like 1991 JW and Apophis in the late 2020 s to check out vehicle systems. Afterwards, the Copernicus spacecraft and its 2 key components, now configured as an Earth Return Vehicle / propellant tanker, would be used for a short round trip (approx.18 - 20 months)/short orbital stay (60 days) Mars / Phobos survey mission in 2033 using a split mission approach. The paper also discusses NASA s current Foundational Technology Development activities and its pre-decisional plans for future system-level Technology Demonstrations that include ground testing a small (approx.7.5 klbf) scalable NTR before the decade is out with a flight test shortly thereafter.

  2. Dust Storm Impacts on Human Mars Mission Equipment and Operations

    NASA Technical Reports Server (NTRS)

    Rucker, M. A.

    2017-01-01

    Although it is tempting to use dust impacts on Apollo lunar exploration mission equipment and operations as an analog for human Mars exploration, there are a number of important differences to consider. Apollo missions were about a week long; a human Mars mission will start at least two years before crew depart from Earth, when cargo is pre-deployed, and crewed mission duration may be over 800 days. Each Apollo mission landed at a different site; although no decisions have been made, NASA is investigating multiple human missions to a single Mars landing site, building up capability over time and lowering costs by re-using surface infrastructure. Apollo missions used two, single-use spacecraft; a human Mars mission may require as many as six craft for different phases of the mission, most of which would be re-used by subsequent crews. Apollo crews never ventured more than a few kilometers from their lander; Mars crews may take "camping trips" a hundred kilo-meters or more from their landing site, utilizing pressurized rovers to explore far from their base. Apollo mission designers weren't constrained by human for-ward contamination of the Moon; if we plan to search for evidence of life on Mars we'll have to be more careful. These differences all impact how we will mitigate and manage dust on our human Mars mission equipment and operations.

  3. Feasibility of a Dragon-Derived Mars Lander for Scientific and Human-Precursor Missions

    NASA Technical Reports Server (NTRS)

    Karcz, John S.; Davis, Sanford S.; Allen, Gary A.; Glass, Brian J.; Gonzales, Andrew; Heldmann, Jennifer Lynne; Lemke, Lawrence G.; McKay, Chris; Stoker, Carol R.; Wooster, Paul Douglass; hide

    2013-01-01

    A minimally-modified SpaceX Dragon capsule launched on a Falcon Heavy rocket presents the possibility of a new low-cost, high-capacity Mars lander for robotic missions. We have been evaluating such a "Red Dragon" platform as an option for the Icebreaker Discovery Program mission concept. Dragon is currently in service ferrying cargo to and from the International Space Station, and a crew transport version is in development. The upcoming version, unlike other Earth-return vehicles, exhibits most of the capabilities necessary to land on Mars. In particular, it has a set of high-thrust, throttleable, storable bi-propellant "SuperDraco" engines integrated directly into the capsule that are intended for launch abort and powered landings on Earth. These thrusters provide the possibility of a parachute-free, fully-propulsive deceleration at Mars from supersonic speeds to the surface, a descent approach which would also scale well to larger future human landers. We will discuss the motivations for exploring a Red Dragon lander, the current results of our analysis of its feasibility and capabilities, and the implications of the platform for the Icebreaker mission concept. In particular, we will examine entry, descent, and landing (EDL) in detail. We will also describe the modifications to Dragon necessary for interplanetary cruise, EDL, and operations on the Martian surface. Our analysis to date indicates that a Red Dragon lander is feasible and that it would be capable of delivering more than 1000 kg of payload to sites at elevations three kilometers below the Mars Orbiter Laser Altimeter (MOLA) reference, which includes sites throughout most of the northern plains and Hellas.

  4. The Mars Express/NASA Project at JPL

    NASA Astrophysics Data System (ADS)

    Thompson, T. W.; Horttor, R. L.; Acton, C. H., Jr.; Zamani, P.; Johnson, W. T. K.; Plaut, J. J.; Holmes, D. P.; No, S.; Asmar, S.; Goltz, G.

    2006-03-01

    The Mars Express/NASA Project at JPL supports much of the U.S. involvement in ESA's Mars Express mission. Mars Express has just completed its prime mission in late 2005 and has embarked on its first extended mission cycle.

  5. Field Test of the ExoMars Panoramic Camera in the High Arctic - First Results and Lessons Learned

    NASA Astrophysics Data System (ADS)

    Schmitz, N.; Barnes, D.; Coates, A.; Griffiths, A.; Hauber, E.; Jaumann, R.; Michaelis, H.; Mosebach, H.; Paar, G.; Reissaus, P.; Trauthan, F.

    2009-04-01

    The ExoMars mission as the first element of the ESA Aurora program is scheduled to be launched to Mars in 2016. Part of the Pasteur Exobiology Payload onboard the ExoMars rover is a Panoramic Camera System (‘PanCam') being designed to obtain high-resolution color and wide-angle multi-spectral stereoscopic panoramic images from the mast of the ExoMars rover. The PanCam instrument consists of two wide-angle cameras (WACs), which will provide multispectral stereo images with 34° field-of-view (FOV) and a High-Resolution RGB Channel (HRC) to provide close-up images with 5° field-of-view. For field testing of the PanCam breadboard in a representative environment the ExoMars PanCam team joined the 6th Arctic Mars Analogue Svalbard Expedition (AMASE) 2008. The expedition took place from 4-17 August 2008 in the Svalbard archipelago, Norway, which is considered to be an excellent site, analogue to ancient Mars. 31 scientists and engineers involved in Mars Exploration (among them the ExoMars WISDOM, MIMA and Raman-LIBS team as well as several NASA MSL teams) combined their knowledge, instruments and techniques to study the geology, geophysics, biosignatures, and life forms that can be found in volcanic complexes, warm springs, subsurface ice, and sedimentary deposits. This work has been carried out by using instruments, a rover (NASA's CliffBot), and techniques that will/may be used in future planetary missions, thereby providing the capability to simulate a full mission environment in a Mars analogue terrain. Besides demonstrating PanCam's general functionality in a field environment, test and verification of the interpretability of PanCam data for in-situ geological context determination and scientific target selection was a main objective. To process the collected data, a first version of the preliminary PanCam 3D reconstruction processing & visualization chain was used. Other objectives included to test and refine the operational scenario (based on ExoMars Rover Reference Surface Mission), to investigate data commonalities and data fusion potential w.r.t. other instruments, and to collect representative image data to evaluate various influences, such as viewing distance, surface structure, and availability of structures at "infinity" (e.g. resolution, focus quality and associated accuracy of the 3D reconstruction). Airborne images with the HRSC-AX camera (airborne camera with heritage from the Mars Express High Resolution Stereo Camera HRSC), collected during a flight campaign over Svalbard in June 2008, provided large-scale geological context information for all field sites.

  6. Mars Pathfinder and Mars Global Surveyor Outreach Compilation

    NASA Astrophysics Data System (ADS)

    1999-09-01

    This videotape is a compilation of the best NASA JPL (Jet Propulsion Laboratory) videos of the Mars Pathfinder and Mars Global Surveyor missions. The mission is described using animation and narration as well as some actual footage of the entire sequence of mission events. Included within these animations are the spacecraft orbit insertion; descent to the Mars surface; deployment of the airbags and instruments; and exploration by Sojourner, the Mars rover. JPL activities at spacecraft control during significant mission events are also included at the end. The spacecraft cameras pan the surrounding Mars terrain and film Sojourner traversing the surface and inspecting rocks. A single, brief, processed image of the Cydonia region (Mars face) at an oblique angle from the Mars Global Surveyor is presented. A description of the Mars Pathfinder mission, instruments, landing and deployment process, Mars approach, spacecraft orbit insertion, rover operation are all described using computer animation. Actual color footage of Sojourner as well as a 360 deg pan of the Mars terrain surrounding the spacecraft is provided. Lower quality black and white photography depicting Sojourner traversing the Mars surface and inspecting Martian rocks also is included.

  7. Mars Pathfinder and Mars Global Surveyor Outreach Compilation

    NASA Technical Reports Server (NTRS)

    1999-01-01

    This videotape is a compilation of the best NASA JPL (Jet Propulsion Laboratory) videos of the Mars Pathfinder and Mars Global Surveyor missions. The mission is described using animation and narration as well as some actual footage of the entire sequence of mission events. Included within these animations are the spacecraft orbit insertion; descent to the Mars surface; deployment of the airbags and instruments; and exploration by Sojourner, the Mars rover. JPL activities at spacecraft control during significant mission events are also included at the end. The spacecraft cameras pan the surrounding Mars terrain and film Sojourner traversing the surface and inspecting rocks. A single, brief, processed image of the Cydonia region (Mars face) at an oblique angle from the Mars Global Surveyor is presented. A description of the Mars Pathfinder mission, instruments, landing and deployment process, Mars approach, spacecraft orbit insertion, rover operation are all described using computer animation. Actual color footage of Sojourner as well as a 360 deg pan of the Mars terrain surrounding the spacecraft is provided. Lower quality black and white photography depicting Sojourner traversing the Mars surface and inspecting Martian rocks also is included.

  8. Report of the 90-day study on human exploration of the Moon and Mars

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The basic mission sequence to achieve the President's goal is clear: begin with Space Station Freedom in the 1990's, return to the Moon to stay early in the Next century, and then journey to Mars. Five reference approaches are modeled building on past programs and recent studies to reflect wide-ranging strategies that incorporate varied program objectives, schedules, technologies, and resource availabilities. The reference approaches are (1) balance and speed; (2) the earliest possible landing on Mars; (3) reduce logistics from Earth; (4) schedule adapted to Space Station Freedom; and (5) reduced scales. The study and programmatic assessment have shown that the Human Exploration Initiative is indeed a feasible approach to achieving the President's goals. Several reasonable alternatives exist, but a long-range commitment and significant resources will be required. However, the value of the program and the benefits to the Nation are immeasurable.

  9. Mars together and FIRE and ICE: Report of the joint US/Russian technical working groups

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Cold War's end opened an opportunity for greater cooperation in planetary exploration for the United States and Russia. Two study groups were formed, Mars Together and FIRE and ICE. The Mars Together team developed a concept for a flight in 1998 that merged one U.S. Mars Surveyor 98 mission with the former Russian Mars 96 mission to further understanding of the Mars surface and atmosphere. The FIRE and ICE team developed concepts for a dual-spacecraft mission to the solar corona and for a mission to Pluto. The missions, scientific potential, and open issues are described.

  10. Mars together and FIRE and ICE: Report of the joint US/Russian technical working groups

    NASA Astrophysics Data System (ADS)

    1994-10-01

    The Cold War's end opened an opportunity for greater cooperation in planetary exploration for the United States and Russia. Two study groups were formed, Mars Together and FIRE and ICE. The Mars Together team developed a concept for a flight in 1998 that merged one U.S. Mars Surveyor 98 mission with the former Russian Mars 96 mission to further understanding of the Mars surface and atmosphere. The FIRE and ICE team developed concepts for a dual-spacecraft mission to the solar corona and for a mission to Pluto. The missions, scientific potential, and open issues are described.

  11. An Alternative Humans to Mars Approach: Reducing Mission Mass with Multiple Mars Flyby Trajectories and Minimal Capability Investments

    NASA Technical Reports Server (NTRS)

    Whitley, Ryan J.; Jedrey, Richard; Landau, Damon; Ocampo, Cesar

    2015-01-01

    Mars flyby trajectories and Earth return trajectories have the potential to enable lower- cost and sustainable human exploration of Mars. Flyby and return trajectories are true minimum energy paths with low to zero post-Earth departure maneuvers. By emplacing the large crew vehicles required for human transit on these paths, the total fuel cost can be reduced. The traditional full-up repeating Earth-Mars-Earth cycler concept requires significant infrastructure, but a Mars only flyby approach minimizes mission mass and maximizes opportunities to build-up missions in a stepwise manner. In this paper multiple strategies for sending a crew of 4 to Mars orbit and back are examined. With pre-emplaced assets in Mars orbit, a transit habitat and a minimally functional Mars taxi, a complete Mars mission can be accomplished in 3 SLS launches and 2 Mars Flyby's, including Orion. While some years are better than others, ample opportunities exist within a given 15-year Earth-Mars alignment cycle. Building up a mission cadence over time, this approach can translate to Mars surface access. Risk reduction, which is always a concern for human missions, is mitigated by the use of flybys with Earth return (some of which are true free returns) capability.

  12. Human Mars Landing Site and Impacts on Mars Surface Operations

    NASA Technical Reports Server (NTRS)

    Bussey, Ben; Hoffman, Stephen J.

    2016-01-01

    NASA has begun a process to identify and discuss candidate locations where humans could land, live and work on the Martian surface. These locations are referred to as Exploration Zones (EZs). Given current mission concepts, an EZ is a collection of Regions of Interest (ROIs) that are located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains a landing site and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. These candidate EZs will be used by NASA as part of a multi-year process of determining where and how humans could explore Mars. In the near term this process includes: (a) identifying locations that would maximize the potential science return from future human exploration missions, (b) identifying locations with the potential for resources required to support humans, (c) developing concepts and engineering systems needed by future human crews to conduct operations within an EZ, and (d) identifying key characteristics of the proposed candidate EZs that cannot be evaluated using existing data sets, thus helping to define precursor measurements needed in advance of human missions. Existing and future robotic spacecraft will be tasked to gather data from specific Mars surface sites within the representative EZs to support these NASA activities. The proposed paper will describe NASA's initial steps for identifying and evaluating candidate EZs and ROIs. This includes plans for the "First Landing Site/Exploration Zone Workshop for Human Missions to the Surface of Mars" to be held in October 2015 at which proposals for EZs and ROIs will be presented and discussed. It will also include a discussion of how these considerations are (or will be) taken into account as future robotic Mars missions are defined and developed. One or more representative EZs, drawn from similar previous studies involving Mars sites, will be used in the proposed paper to illustrate the process NASA envisions for gathering additional data from robotic precursor missions to assist in making a final selection of an EZ for human crews as well as the steps likely to occur during the buildup of a habitation site. Examples of the systems and operations likely to be used by human crews, assisted by robotic vehicles, to explore the scientific ROIs as well as developing the resource ROIs within the example EZs will be discussed.

  13. Mars Orbiter Study. Volume 2: Mission Design, Science Instrument Accommodation, Spacecraft Design

    NASA Technical Reports Server (NTRS)

    Drean, R.; Macpherson, D.; Steffy, D.; Vargas, T.; Shuman, B.; Anderson, K.; Richards, B.

    1982-01-01

    Spacecraft system and subsystem designs were developed at the conceptual level to perform either of two Mars Orbiter Missions, a Climatology Mission and an Aeronomy Mission. The objectives of these missions are to obtain and return data to increase knowledge of Mars.

  14. Mars NanoOrbiter: A CubeSat for Mars System Science

    NASA Astrophysics Data System (ADS)

    Ehlmann, Bethany; Klesh, Andrew; Alsedairy, Talal

    2017-10-01

    The Mars NanoOrbiter mission consists of two identical 12U spacecraft, launched simultaneously as secondary payloads on a larger planetary mission launch, and deployed to Earth-escape, as early as with Mars 2020. The nominal mission will last for 1 year, during which time the craft will independently navigate to Mars, enter into elliptical orbit, and achieve close flybys of Phobos and Deimos, obtaining unprecedented coverage of each moon. The craft will additionally provide high temporal resolution data of Mars clouds and atmospheric phenomena at multiple times of day. Two spacecraft provide redundancy to reduce the risk in meeting the science objectives at the Mars moons and enhanced coverage of the dynamic Mars atmosphere. This technology is enabled by recent advances in CubeSat propulsion technology, attitude control systems, guidance, navigation and control. NanoOrbiter builds directly on the systems heritage of the MarCO mission, scheduled to launch with the 2018 Discovery mission Insight.

  15. Mars Scout 2007 - a current status

    NASA Technical Reports Server (NTRS)

    Matousek, Steve

    2003-01-01

    The Mars Program institutes the Mars Scout Missions in order to address science goals in the program not otherwise covered in baseline Mars plans. Mars Scout missions will be Principal-Investigator (PI) led science missions. Analogous to the Discovery Program, PI-led investigations optimize the use of limited resources to accomplish focused science and allow the flexibility to quickly respond to discoveries at Mars. Scout missions also require unique investments in technology and reliance upon Mars-based infrastructure such as telecom relay orbiters. Scouts utilize a two-step competitive process for selection. In Dec, 2002, the Step 2 selections by NASA were announced and then approximately five month studies will result in a selection for flight around August, 2003 for a mission to be launched in 2007.

  16. (abstract) Telecommunications for Mars Rovers and Robotic Missions

    NASA Technical Reports Server (NTRS)

    Cesarone, Robert J.; Hastrup, Rolf C.; Horne, William; McOmber, Robert

    1997-01-01

    Telecommunications plays a key role in all rover and robotic missions to Mars both as a conduit for command information to the mission and for scientific data from the mission. Telecommunications to the Earth may be accomplished using direct-to-Earth links via the Deep Space Network (DSN) or by relay links supported by other missions at Mars. This paper reviews current plans for missions to Mars through the 2005 launch opportunity and their capabilities in support of rover and robotic telecommunications.

  17. Mars Analog Mission: Glacier Simulation AMADEE-15 by Austrian Space Forum

    NASA Astrophysics Data System (ADS)

    Groemer, Gernot; Losiak, Anna; Soucek, Alexander; Plank, Clemens; Zanardini, Laura; Sejkora, Nina; Sams, Sebastian

    2016-04-01

    Austrian Space Forum: The Austrian Space Forum (OeWF, Österreichisches Weltraum Forum) is a non-profit, citizen-science organization of aerospace specialists and enthusiasts. One of its specialisations is Mars analog research. Analog studies and analog instrument validation supported all planetary surface missions so far [1] and are considered as an effective tool to prepare for future missions to Mars [2,3,4,5,6,7]. Since 2006, OeWF has conducted 11 Mars analog field campaigns in diverse locations that represented: 1) average current Mars conditions (the Mars Desert Research Station (MDRS) in Utah in 2006 [8] and the Northern Sahara near Erfoud, Morocco in 2013 [9]); 2) the early and wet Mars (analog site of Rio Tinto Spain in 2011 [10]); and 3) subsurface exploration (Dachstein Ice Caves in 2012). During these campaigns, 68 experiments and major engineering tests were performed, whichwere mostly focused on astrobiology, robotics, human factors, geoscience and spacesuit operations. Major assets of OeWF include two advanced spacesuit simulators Aouda [11], an increasingly evolving Mission Support Center, a dedicated Remote Science Support team [12], and a growing set of Standard Operating Procedures defining major workflows within a mission team. The spacesuit simulators were operated by a total of 18 analog astronauts, who were selected and trained during a >6 month program. Total EVA time is nearly 600 hours, leading to a significant experience in analog field simulations. AMADEE-15: The mission took place between August 2nd and 14th 2015 at the Kaunertal Glacier in Tyrol, Austria. This glacier was selected as a study site because of its accessibility and high number of micro-landscapes analogous to those expected on Mars in locations where abundant water ice is present. As such it is considered a first-tier Mars analog [13]. The Base station was located at N 46.86320, E 10.71401 at 2800 masl, the highest reached location was on elevation of 2887 m. Eleven experiments were conducted by a field crew at the test site under simulated Martian surface exploration conditions, coordinated by the Mission Support Center in Innsbruck, Austria. A 10-minute satellite communication delay and other limitations pertinent to human planetary surface activities were introduced. A detailed description of the mission should be soon published in [14]. References: [1] Preston & Dartnell 2014. Int. J. Astrobiol. 13:81-98. [2] Drake et al. 2009. NASA-SP-2009-566.pdf. [3] Ross et al. 2013. Act. Astronaut. 90:182-202. [4] Abercromby et al. 2013. Act. Astronaut. 91:34-48. [5] Binstead et al. 2015. Human Research Program Investigators Workshop. [6] Imhof et al. 2015. AIAA SPACE 2015 Conference and Exposition. [7] Bessone et al. 2015. 10.1007/978-3-319-15982-9_37. [8] Groemer et al. 2007. AustroMars Sci. Worksh.:4-12. [9] Groemer et al. 2014. Astrobiol. 14:360-376. [10] Orgel et al. 2013. Act. Astronaut. 94:736-748. [11] Groemer et al. 2012. Astrobiol. 12(2):125-134. [12] Losiak et al. 2014. Astrobiol. 14:417-430. [13] Soare et al. 2001. EOS82, 501. [14] Gernot et al. 2016. Act. Astronaut. (in review).

  18. Mars Relays Satellite Orbit Design Considerations for Global Support of Robotic Surface Missions

    NASA Technical Reports Server (NTRS)

    Hastrup, Rolf; Cesarone, Robert; Cook, Richard; Knocke, Phillip; McOmber, Robert

    1993-01-01

    This paper discusses orbit design considerations for Mars relay satellite (MRS)support of globally distributed robotic surface missions. The orbit results reported in this paper are derived from studies of MRS support for two types of Mars robotic surface missions: 1) the mars Environmental Survey (MESUR) mission, which in its current definition would deploy a global network of up to 16 small landers, and 2)a Small Mars Sample Return (SMSR) mission, which included four globally distributed landers, each with a return stage and one or two rovers, and up to four additional sets of lander/rover elements in an extended mission phase.

  19. Ongoing Mars Missions: Extended Mission Plans

    NASA Astrophysics Data System (ADS)

    Zurek, Richard; Diniega, Serina; Crisp, Joy; Fraeman, Abigail; Golombek, Matt; Jakosky, Bruce; Plaut, Jeff; Senske, David A.; Tamppari, Leslie; Thompson, Thomas W.; Vasavada, Ashwin R.

    2016-10-01

    Many key scientific discoveries in planetary science have been made during extended missions. This is certainly true for the Mars missions both in orbit and on the planet's surface. Every two years, ongoing NASA planetary missions propose investigations for the next two years. This year, as part of the 2016 Planetary Sciences Division (PSD) Mission Senior Review, the Mars Odyssey (ODY) orbiter project submitted a proposal for its 7th extended mission, the Mars Exploration Rover (MER-B) Opportunity submitted for its 10th, the Mars Reconnaissance Orbiter (MRO) for its 4th, and the Mars Science Laboratory (MSL) Curiosity rover and the Mars Atmosphere and Volatile Evolution (MVN) orbiter for their 2nd extended missions, respectively. Continued US participation in the ongoing Mars Express Mission (MEX) was also proposed. These missions arrived at Mars in 2001, 2004, 2006, 2012, 2014, and 2003, respectively. Highlights of proposed activities include systematic observations of the surface and atmosphere in twilight (early morning and late evening), building on a 13-year record of global mapping (ODY); exploration of a crater rim gully and interior of Endeavour Crater, while continuing to test what can and cannot be seen from orbit (MER-B); refocused observations of ancient aqueous deposits and polar cap interiors, while adding a 6th Mars year of change detection in the atmosphere and the surface (MRO); exploration and sampling by a rover of mineralogically diverse strata of Mt. Sharp and of atmospheric methane in Gale Crater (MSL); and further characterization of atmospheric escape under different solar conditions (MVN). As proposed, these activities follow up on previous discoveries (e.g., recurring slope lineae, habitable environments), while expanding spatial and temporal coverage to guide new detailed observations. An independent review panel evaluated these proposals, met with project representatives in May, and made recommendations to NASA in June 2016. In this presentation, we will highlight the planned activities of these NASA Mars missions, as they start new chapters in their historic exploration of the dynamic and complex planet that is Mars.

  20. Interplanetary Mission Design Handbook: Earth-to-Mars Mission Opportunities and Mars-to-Earth Return Opportunities 2009-2024

    NASA Technical Reports Server (NTRS)

    George, L. E.; Kos, L. D.

    1998-01-01

    This paper provides information for trajectory designers and mission planners to determine Earth-Mars and Mars-Earth mission opportunities for the years 2009-2024. These studies were performed in support of a human Mars mission scenario that will consist of two cargo launches followed by a piloted mission during the next opportunity approximately 2 years later. "Porkchop" plots defining all of these mission opportunities are provided which include departure energy, departure excess speed, departure declination arrival excess speed, and arrival declinations for the mission space surrounding each opportunity. These plots are intended to be directly applicable for the human Mars mission scenario described briefly herein. In addition, specific trajectories and several alternate trajectories are recommended for each cargo and piloted opportunity. Finally, additional studies were performed to evaluate the effect of various thrust-to-weight ratios on gravity losses and total time-of-flight tradeoff, and the resultant propellant savings and are briefly summarized.

  1. Mars Rover/Sample Return (MRSR) Mission: Mars Rover Technology Workshop

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A return to the surface of Mars has long been an objective of NASA mission planners. The ongoing Mars Rover and Sample Return (MRSR) mission study represents the latest stage in that interest. As part of NASA's preparation for a possible MRSR mission, a technology planning workshop was held to attempt to define technology requirements, options, and preliminary plans for the principal areas of Mars rover technology. The proceedings of that workshop are presented.

  2. Evaluation of Human and AutomationRobotics Integration Needs for Future Human Exploration Missions

    NASA Technical Reports Server (NTRS)

    Marquez, Jessica J.; Adelstein, Bernard D.; Ellis, Stephen; Chang, Mai Lee; Howard, Robert

    2016-01-01

    NASA employs Design Reference Missions (DRMs) to define potential architectures for future human exploration missions to deep space, the Moon, and Mars. While DRMs to these destinations share some components, each mission has different needs. This paper focuses on the human and automation/robotic integration needs for these future missions, evaluating them with respect to NASA research gaps in the area of space human factors engineering. The outcomes of our assessment is a human and automation/robotic (HAR) task list for each of the four DRMs that we reviewed (i.e., Deep Space Sortie, Lunar Visit/Habitation, Deep Space Habitation, and Planetary), a list of common critical HAR factors that drive HAR design.

  3. Power System Overview for the Small RPS Centaur Flyby and the Mars Polar Hard Lander NASA COMPASS Studies

    NASA Technical Reports Server (NTRS)

    Cataldo, Robert L.

    2014-01-01

    The NASA Glenn Research Center (GRC) Radioisotope Power System Program Office (RPSPO) sponsored two studies lead by their mission analysis team. The studies were performed by NASA GRCs Collaborative Modeling for Parametric Assessment of Space Systems (COMPASS) team. Typically a complete toplevel design reference mission (DRM) is performed assessing conceptual spacecraft design, launch mass, trajectory, science strategy and sub-system design such as, power, propulsion, structure and thermal.

  4. Continuing the International Roadmapping Effort - An Introduction to the Evolution of the ISECG Global Exploration Roadmap

    NASA Astrophysics Data System (ADS)

    Schlutz, Juergen; Hufenbach, Bernhard; Laurini, Kathy; Spiero, Francois

    2016-07-01

    Future space exploration goals call for sending humans and robots beyond low Earth orbit and establishing sustained access to destinations such as the Moon, asteroids and Mars. Space agencies participating in the International Space Exploration Coordination Group (ISECG) are discussing an international approach for achieving these goals, documented in ISECG's Global Exploration Roadmap (GER). The GER reference scenario reflects a step-wise evolution of critical capabilities from ISS to missions in the lunar vicinity in preparation for the journey of humans to Mars. As ISECG agencies advance their individual planning, they also advance the mission themes and reference architecture of the GER to consolidate common goals, near-term mission scenarios and initial opportunities for collaboration. In this context, particular focus has been given to the Better understanding and further refinement of cislunar infrastructure and potential lunar transportation architecture Interaction with international science communities to identify and articulate the scientific opportunities of the near-term exploration mission themes Coordination and consolidation of interest in lunar polar volatiles prospecting and potential for in-situ resource utilisation Identification and articulation of the benefits from exploration and the technology transfer activities The paper discusses the ongoing roadmapping activity of the ISECG agencies. It provides an insight into the status of the above activities and an outlook towards the evolution of the GER that is currently foreseen in the 2017 timeframe.

  5. Human Mars Landing Site and Impacts on Mars Surface Operations

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.; Bussey, Ben

    2016-01-01

    This paper describes NASA's initial steps for identifying and evaluating candidate Exploration Zones (EZs) and Regions of Interests (ROIs) for the first human crews that will explore the surface of Mars. NASA's current effort to define the exploration of this planet by human crews, known as the Evolvable Mars Campaign (EMC), provides the context in which these EZs and ROIs are being considered. The EMC spans all aspects of a human Mars mission including launch from Earth, transit to and from Mars, and operations on the surface of Mars. An EZ is a collection of ROIs located within approximately 100 kilometers of a centralized landing site. ROIs are areas relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains one or more landing sites and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. With the EMC as a conceptual basis, the EZ model has been refined to a point where specific site selection criteria for scientific exploration and in situ resource utilization can be defined. In 2015 these criteria were distributed to the planetary sciences community and the in situ resource utilization and civil engineering communities as part of a call for EZ proposals. The resulting "First Landing Site/Exploration Zone Workshop for Human Missions to the Surface of Mars" was held in October 2015 during which 47 proposals for EZs and ROIs were presented and discussed. Proposed locations spanned all longitudes and all allowable latitudes (+/- 50 degrees). Proposed justification for selecting one of these EZs also spanned a significant portion of the scientific and resource criteria provided to the community. Several important findings resulted from this Workshop including: (a) a strong consensus that, at a scale of 100 km (radius), multiple places on Mars exist that have both sufficient scientific interest to sustain multiple crews of exploring astronauts, AND potential resource deposits for ISRU indicating the current EZ definition is viable and should be retained for now, (b) new data types (needed for more definitive analysis of EZs) argued strongly for a new orbiter mission, and possibly one or more surface missions, to obtain these data, (c) a general consensus that this Workshop was an excellent start to identifying a place where future human missions to Mars can productively explore this planet and learn to live and work there for the long term. Building on these findings, HEOMD and SMD are: (a) refining the EZ selection criteria and overall selection process to improve on lessons learned from the first EZ workshop, (b) using these proposed locations to develop "reference EZs" for assessment purposes (primarily engineering assessments), (c) gathering data and conducting analyses to better understanding the different potential sources for water, including the ease of extraction and purification, and (d) assessing trends in additional data that are needed to better characterize EZs proposed at the workshop and how these data needs impact the design and operation of future robotic Mars missions.

  6. Mars Sample Return and Flight Test of a Small Bimodal Nuclear Rocket and ISRU Plant

    NASA Technical Reports Server (NTRS)

    George, Jeffrey A.; Wolinsky, Jason J.; Bilyeu, Michael B.; Scott, John H.

    2014-01-01

    A combined Nuclear Thermal Rocket (NTR) flight test and Mars Sample Return mission (MSR) is explored as a means of "jump-starting" NTR development. Development of a small-scale engine with relevant fuel and performance could more affordably and quickly "pathfind" the way to larger scale engines. A flight test with subsequent inflight postirradiation evaluation may also be more affordable and expedient compared to ground testing and associated facilities and approvals. Mission trades and a reference scenario based upon a single expendable launch vehicle (ELV) are discussed. A novel "single stack" spacecraft/lander/ascent vehicle concept is described configured around a "top-mounted" downward firing NTR, reusable common tank, and "bottom-mount" bus, payload and landing gear. Requirements for a hypothetical NTR engine are described that would be capable of direct thermal propulsion with either hydrogen or methane propellant, and modest electrical power generation during cruise and Mars surface insitu resource utilization (ISRU) propellant production.

  7. Austere Human Missions to Mars

    NASA Technical Reports Server (NTRS)

    Price, Hoppy; Hawkins, Alisa M.; Tadcliffe, Torrey O.

    2009-01-01

    The Design Reference Architecture 5 (DRA 5) is the most recent concept developed by NASA to send humans to Mars in the 2030 time frame using Constellation Program elements. DRA 5 is optimized to meet a specific set of requirements that would provide for a robust exploration program to deliver a new six-person crew at each biennial Mars opportunity and provide for power and infrastructure to maintain a highly capable continuing human presence on Mars. This paper examines an alternate architecture that is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. It is recognized that a mission set using this approach would not meet all the current Constellation Mars mission requirements; however, this 'austere' architecture may represent a minimum mission set that would be acceptable from a science and exploration standpoint. The austere approach is driven by a philosophy of minimizing high risk or high cost technology development and maximizing development and production commonality in order to achieve a program that could be sustained in a flat-funded budget environment. Key features that would enable a lower technology implementation are as follows: using a blunt-body entry vehicle having no deployable decelerators, utilizing aerobraking rather than aerocapture for placing the crewed element into low Mars orbit, avoiding the use of liquid hydrogen with its low temperature and large volume issues, using standard bipropellant propulsion for the landers and ascent vehicle, and using radioisotope surface power systems rather than a nuclear reactor or large area deployable solar arrays. Flat funding within the expected NASA budget for a sustained program could be facilitated by alternating cargo and crew launches for the biennial Mars opportunities. This would result in two assembled vehicles leaving Earth orbit for Mars per Mars opportunity. The first opportunity would send two cargo landers to the Mars surface to preposition a habitat, supplies, and exploration equipment. The next opportunity, two years later, would send to Mars orbit 1) a lander with a Mars Ascent Vehicle (MAV) and 2) a crewed Mars Transit Habitat with an Orion CEV for Earth return. The following opportunity, two years after the first crew, would go back to cargo-only launches. This alternation of cargo and crew opportunities results in a sustainable launch rate of six Ares V launches every two years. It is notable that four of the six launches per Mars opportunity are identical, build-to-print, Tran-Mars Injection stages. This type of production rate could lend itself well to a COTStype service provider, and would make it feasible to have a live spare in place in the event of a single launch failure.

  8. Automation &robotics for future Mars exploration

    NASA Astrophysics Data System (ADS)

    Schulte, W.; von Richter, A.; Bertrand, R.

    2003-04-01

    Automation and Robotics (A&R) are currently considered as a key technology for Mars exploration. initiatives in this field aim at developing new A&R systems and technologies for planetary surface exploration. Kayser-Threde led the study AROMA (Automation &Robotics for Human Mars Exploration) under ESA contract in order to define a reference architecture of A&R elements in support of a human Mars exploration program. One of the goals was to define new developments and to maintain the competitiveness of European industry within this field. We present a summary of the A&R study in respect to a particular system: The Autonomous Research Island (ARI). In the Mars exploration scenario initially a robotic outpost system lands at pre-selected sites in order to search for life forms and water and to analyze the surface, geology and atmosphere. A&R systems, i.e. rovers and autonomous instrument packages, perform a number of missions with scientific and technology development objectives on the surface of Mars as part of preparations for a human exploration mission. In the Robotic Outpost Phase ARI is conceived as an automated lander which can perform in-situ analysis. It consists of a service module and a micro-rover system for local investigations. Such a system is already under investigation and development in other TRP activities. The micro-rover system provides local mobility for in-situ scientific investigations at a given landing or deployment site. In the long run ARI supports also human Mars missions. An astronaut crew would travel larger distances in a pressurized rover on Mars. Whenever interesting features on the surface are identified, the crew would interrupt the travel and perform local investigations. In order to save crew time ARI could be deployed by the astronauts to perform time-consuming investigations as for example in-situ geochemistry analysis of rocks/soil. Later, the crew could recover the research island for refurbishment and deployment at another site. In the frame of near-term Mars exploration a dedicated exobiology mission is envisaged. Scientific and technical studies for a facility to detect the evidence of past of present life have been carried out under ESA contract. Mars soil/rock samples are to be analyzed for their morphology, organic and inorganic composition using a suite of scientific instruments. Robotic devices, e.g. for the acquisition, handling and onboard processing of Mars sample material retrieved from different locations, and surface mobility are important elements in a fully automated mission. Necessary robotic elements have been identified in past studies. Their realization can partly be based on heritage of existing space hardware, but will require dedicated development effort.

  9. Research on lunar and planet development and utilization

    NASA Astrophysics Data System (ADS)

    Iwata, Tsutomu; Etou, Takao; Imai, Ryouichi; Oota, Kazuo; Kaneko, Yutaka; Maeda, Toshihide; Takano, Yutaka

    1992-08-01

    Status of the study on unmanned and manned lunar missions, unmanned Mars missions, lunar resource development and utilization missions, remote sensing exploration missions, survey and review to elucidate the problems of research and development for lunar resource development and utilization, and the techniques and equipment for lunar and planet exploration are presented. Following items were studied respectively: (1) spacecraft systems for unmanned lunar missions, such as lunar observation satellites, lunar landing vehicles, lunar surface rovers, lunar surface hoppers, and lunar sample retrieval; (2) spacecraft systems for manned lunar missions, such as manned lunar bases, lunar surface operation robots, lunar surface experiment systems, manned lunar take-off and landing vehicles, and lunar freight transportation ships; (3) spacecraft systems for Mars missions, such as Mars satellites, Phobos and Deimos sample retrieval vehicles, Mars landing explorers, Mars rovers, Mars sample retrieval; (4) lunar resource development and utilization; and (5) remote sensing exploration technologies.

  10. Mars - The relationship of robotic and human elements in the IAA International Exploration of Mars study

    NASA Technical Reports Server (NTRS)

    Marov, Mikhail YA.; Duke, Michael B.

    1993-01-01

    The roles of human and robotic missions in Mars exploration are defined in the context of the short- and long-term Mars programs. In particular, it is noted that the currently implemented and planned missions to Mars can be regarded as robotic precursor missions to human exploration. Attention is given to factors that must be considered in formulating the rationale for human flights to Mars and future human Mars settlements and justifying costly projects.

  11. French Participation in Mars Sample Return (and MARS Exploration)

    NASA Astrophysics Data System (ADS)

    Counil, Jean-Louis

    2000-10-01

    This presentation focused on high level contribution to the first MARS Sample Return mission. It further discusses leadership of the European Netlander project, Payload Instruments on the ESA-mission MARS-Express, Contribution to US Micro-missions, Instruments on Landers (PALOMA, Ma-FLUX), and Co-Is.

  12. Anomaly Trends for Missions to Mars: Mars Global Surveyor and Mars Odyssey

    NASA Technical Reports Server (NTRS)

    Green, Nelson W.; Hoffman, Alan R.

    2008-01-01

    Conducted as a part of NASA Ultra-Reliability effort: Goal is to design for increased reliability in all NASA missions. Desire is to increase reliability by a factor of 10. Study provides a baseline for current technology. Analyzed anomalies for spacecraft orbiting Mars. Long lived spacecraft. Comparison with current rover missions and past orbiters. Looked for trends to assist design of future missions.

  13. Computer processing of Mars Odyssey THEMIS IR imaging, MGS MOLA altimetry and Mars Express stereo imaging to locate Airy-0, the Mars prime meridian reference

    NASA Astrophysics Data System (ADS)

    Duxbury, Thomas; Neukum, Gerhard; Smith, David E.; Christensen, Philip; Neumann, Gregory; Albee, Arden; Caplinger, Michael; Seregina, N. V.; Kirk, Randolph L.

    The small crater Airy-0 was selected from Mariner 9 images to be the reference for the Mars prime meridian. Initial analyses were made in year 2000 to tie Viking Orbiter and Mars Orbiter Camera images of Airy-0 to the evolving Mars Orbiter Laser Altimeter global digital terrain model to improve the location accuracy of Airy-0. Based upon this tie and radiometric tracking of landers / rovers from earth, new expressions for the Mars spin axis direction, spin rate and prime meridian epoch value were produced to define the orientation of the Martian surface in inertial space over time. Now that the Mars Global Surveyor mission and the Mars Orbiter Laser Altimeter global digital terrain model are complete, a more exhaustive study has been performed to determine the location of Airy-0 relative to the global terrain grid. THEMIS IR image cubes of the Airy and Gale crater regions were tied to the global terrain grid using precision stereo photogrammetric image processing techniques. The Airy-0 location was determined to be within 50 meters of the currently defined IAU prime meridian, with this offset at the limiting absolute accuracy of the global terrain grid. Additional outputs of this study were a controlled multi-band photomosaic of Airy, precision alignment and geometric models of the ten THEMIS IR bands and a controlled multi-band photomosaic of Gale crater used to validate the Mars Surface Laboratory operational map products supporting their successful landing on Mars.

  14. ExoMars Mission 2016, Orbiter Module Power System Architecture (Based On An Unregulated Bus & MPPT Controlled Step-Down Voltage Regulators)

    NASA Astrophysics Data System (ADS)

    Digoin, JJ.; Boutelet, E.

    2011-10-01

    The main objective of the ExoMars program is to demonstrate key flight in situ enabling technologies in support of the European ambitions for future exploration missions and to pursue fundamental scientific investigations. Two missions are foreseen within the ExoMars program for the 2016 and 2018 launch opportunities to Mars. The 2016 mission is an ESA led mission that will supply a Mars Orbiter Module (OM) carrying an Entry Descent module (EDM) and NASA/ESA scientific instruments. The 2018 mission is a NASA led mission bringing one ESA rover and one NASA rover onto the Mars surface. This paper presents the OM Electrical Power Sub- system (EPS) design achieved at the end of pre- development phase. The main aspects addressed are: - EPS major constraints due to mission and environment, a succinct description of the power units, - Trade-off analyses results leading to the selected EPS architecture, - Preliminary results of electrical and energy simulations, - EPS units development plan.

  15. Software Aids Visualization Of Mars Pathfinder Mission

    NASA Technical Reports Server (NTRS)

    Weidner, Richard J.

    1996-01-01

    Report describes Simulator for Imager for Mars Pathfinder (SIMP) computer program. SIMP generates "virtual reality" display of view through video camera on Mars lander spacecraft of Mars Pathfinder mission, along with display of pertinent textual and graphical data, for use by scientific investigators in planning sequences of activities for mission.

  16. Crossing Mars: Past and Future Missions to a Cold, Dry Desert

    NASA Technical Reports Server (NTRS)

    Landis, Geoffrey A.

    2002-01-01

    Dr. Geoffrey A. Landis of the Photovoltaics and Space Environment Effects Branch presented an overview of recent discoveries about the environment of Mars. He covered missions from the 1966 Mariner IV that returned those first grainy close-up pictures of Mars showing an ancient cratered terrain to the Mars Odyssey mission with its tantalizing evidence of recent water flows on Mars. Mars is one of the most interesting planets in the solar system, featuring enormous canyons, giant volcanoes, and indications that, early in its history, it might have had rivers and perhaps even oceans. Five years ago, in July of 1997, the Pathfinder mission landed on Mars, bringing with it the microwave-oven sized Sojourner rover to wander around on the surface and analyze rocks. Pathfinder is only the first of an armada of spacecraft that will examine Mars from the pole to the equator in the next decade, culminating (someday, we hope!) with a mission to bring humans to Mars.

  17. Comparison of mission design options for manned Mars missions

    NASA Technical Reports Server (NTRS)

    Babb, Gus R.; Stump, William R.

    1986-01-01

    A number of manned Mars mission types, propulsion systems, and operational techniques are compared. Conjunction and opposition class missions for cryogenic, hybrid (cryo/storable), and NERVA propulsion concepts are addressed. In addition, both Earth and Mars orbit aerobraking, direct entry of landers, hyperbolic rendezvous, and electric propulsion cases are examined. A common payload to Mars was used for all cases. The basic figure of merit used was weight in low Earth orbit (LEO) at mission initiation. This is roughly proportional to launch costs.

  18. Life sciences interests in Mars missions

    NASA Technical Reports Server (NTRS)

    Rummel, John D.; Griffiths, Lynn D.

    1989-01-01

    NASA's Space Life Sciences research permeates plans for Mars missions and the rationale for the exploration of the planet. The Space Life Sciences program has three major roles in Mars mission studies: providing enabling technology for piloted missions, conducting scientific exploration related to the origin and evolution of life, and protecting space crews from the adverse physiological effects of space flight. This paper presents a rationale for exploration and some of the issues, tradeoffs, and visions being addressed in the Space Life Sciences program in preparation for Mars missions.

  19. Life Sciences Issues for a Mission to Mars

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Session MP5 includes short reports on: (1) Cardiovascular Concerns for a Mars Mission: Autonomic and Biomechanical Effects; (2) Reducing the Risk of Space Radiation Induced Bioeffects: Vehicle Design and Protectant Molecules; (3) Musculoskeletal Issues for Long Duration Mission: Muscle Mass Preservation, Renal Stone Risk Factors, Countermeasures, and Contingency Treatment Planning; (4) Psychological Issues and Crew Selection for a Mars Mission: Maximizing the Mix for the Long Haul; and (5) Issues in Crew Health, Medical Selection and Medical Officer (CMO) Training for a Mission to Mars.

  20. G. Marconi: A Data Relay Satellite for Mars Communications

    NASA Astrophysics Data System (ADS)

    Dionisio, C.; Marcozzi, M.; Landriani, C.

    2002-01-01

    Mars has always been a source of intrigue and fascination. Recent scientific discoveries have stimulated this longstanding interest, leading to a renaissance in Mars exploration. Future missions to Mars will be capable of long-distance surface mobility, hyperspectral imaging, subsurface exploration, and even life-detection. Manned missions and, eventually, colonies may follow. No mission to the Red Planet stands alone. New scientific and technological knowledge is passed on from one mission to the next, not only improving the journey into space, but also providing benefits here on Earth. The Mars Relay Network, an international constellation of Mars orbiters with relay radios, directly supports other Mars missions by relaying communications between robotic vehicles at Mars and ground stations on Earth. The ability of robotic visitors from Earth to explore Mars will take a gigantic leap forward in 2007 with the launch of the Guglielmo Marconi Orbiter (GMO), the first spacecraft primarily dedicated to providing communication relay, navigation and timing services at Mars. GMO will be the preeminent node of the Mars Relay Network. GMO will relay communications between Earth and robotic vehicles near Mars. GMO will also provide navigation services to spacecraft approaching Mars. GMO will receive transmissions from ground stations on Earth at X-band and will transmit to ground stations on Earth at X- and Ka-bands. GMO will transmit to robotic vehicles at Mars at UHF and receive from these vehicles at UHF and X-band. GMO's baseline 4450 km circular orbit provides complete coverage of the planet for telecommunication and navigation support. GMO will arrive at Mars in mid-2008, just before the NetLander and Mars Scout missions that will be its first users. GMO is designed for a nominal operating lifetime of 10 years and will support nominal commanding and data acquisition, as well as mission critical events such as Mars Orbit Insertion, Entry, Descent and Landing, and Mars Ascent Vehicle launch and Orbiting Sample Canister detection for the Mars Sample Return mission. The GMO mission is a close collaboration between the Italian and American national space agencies and two implementing organizations: Alenia Spazio in Italy and JPL in the United States. As the Italian prime contractor, Alenia Spazio is to design and fabricate the spacecraft bus, integrate the Italian and JPL payloads, support integration of the spacecraft with the launch vehicle, support launch, and conduct mission operations. GMO will use Alenia' s PRIMA spacecraft bus in a deep space configuration. The PRIMA bus is a new design concept, developed under ASI funding, that combines flexibility, low cost and high efficiency. Its modular design makes it adaptable for several classes of missions, including interplanetary.

  1. Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion

    NASA Astrophysics Data System (ADS)

    Borowski, Stanley K.; Dudzinski, Leonard A.; McGuire, Melissa L.

    2002-12-01

    The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (1sp is approximately 850-1000 s) capability and its attractive engine thrust-to-weight ratio (approximately 3-10). To stay within the available mass and payload volume limits of a "Magnum" heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (approximately 10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as "bimodal" operation), a robust, multiple burn, "power-rich" stage with propulsive Mars capture and reuse capability is possible. A family of modular bimodal NTR (BNTR) vehicles are described which utilize a common "core" stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, zero-boiloff liquid hydrogen (LH2) storage, and high data rate communications. An innovative, spine-like "saddle truss" design connects the core stage and payload element and is open underneath to allow supplemental "in-line" propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A "modified" DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step--use of the BNTR for propulsive capture of all payload elements into Mars orbit--the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass "aerodescent" shell. The attractiveness of the "all BNTR" option is further increased by the substitution of the lightweight, inflatable "TransHab" module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR / Earth return vehicle (ERV). It also allows the crew to travel to and from Mars on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half--from approximately 4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the "all LH2" BNTR stage. The use of "LOX-augmented" NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixture ratio (MR) of 0.5, helps to increase "bulk" propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH2 only (MR=0) to maximize vehicle performance while staying within the mass limits of two Magnum launches.

  2. Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion. Revised Dec. 1998

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; Dudzinski, Leonard A.; McGuire, Melissa L.

    2002-01-01

    The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (1sp is approximately 850-1000 s) capability and its attractive engine thrust-to-weight ratio (approximately 3-10). To stay within the available mass and payload volume limits of a "Magnum" heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (approximately 10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as "bimodal" operation), a robust, multiple burn, "power-rich" stage with propulsive Mars capture and reuse capability is possible. A family of modular bimodal NTR (BNTR) vehicles are described which utilize a common "core" stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, zero-boiloff liquid hydrogen (LH2) storage, and high data rate communications. An innovative, spine-like "saddle truss" design connects the core stage and payload element and is open underneath to allow supplemental "in-line" propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A "modified" DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step--use of the BNTR for propulsive capture of all payload elements into Mars orbit--the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass "aerodescent" shell. The attractiveness of the "all BNTR" option is further increased by the substitution of the lightweight, inflatable "TransHab" module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR / Earth return vehicle (ERV). It also allows the crew to travel to and from Mars on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half--from approximately 4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the "all LH2" BNTR stage. The use of "LOX-augmented" NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixture ratio (MR) of 0.5, helps to increase "bulk" propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH2 only (MR=0) to maximize vehicle performance while staying within the mass limits of two Magnum launches.

  3. Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using "Bimodal" NTR and LANTR Propulsion

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; Dudzinski, Leonard A.; McGuire, Melissa L.

    1998-01-01

    The nuclear thermal rocket (NTR) is one of the leading propulsion options for future human missions to Mars because of its high specific impulse (Isp-850-1000 s) capability and its attractive engine thrust-to-weight ratio (approximately equal 3-10). To stay within the available mass and payload volume limits of a "Magnum" heavy lift vehicle, a high performance propulsion system is required for trans-Mars injection (TMI). An expendable TMI stage, powered by three 15 thousand pounds force (klbf) NTR engines is currently under consideration by NASA for its Design Reference Mission (DRM). However, because of the miniscule burnup of enriched uranium-235 during the Earth departure phase (approximately 10 grams out of 33 kilograms in each NTR core), disposal of the TMI stage and its engines after a single use is a costly and inefficient use of this high performance stage. By reconfiguring the engines for both propulsive thrust and modest power generation (referred to as "bimodal" operation), a robust, multiple burn, "power-rich" stage with propulsive Mars capture and reuse capability is possible, A family of modular "bimodal" NTR (BNTR) vehicles are described which utilize a common "core" stage powered by three 15 klbf BNTRs that produce 50 kWe of total electrical power for crew life support, an active refrigeration / reliquification system for long term, "zero-boiloff" liquid hydrogen (LH2) storage, and high data rate communications. An innovative, spine-like "saddle truss" design connects the core stage and payload element and is open underneath to allow supplemental "in-line" propellant tanks and contingency crew consumables to be easily jettisoned to improve vehicle performance. A "modified" DRM using BNTR transfer vehicles requires fewer transportation system elements, reduces IMLEO and mission risk, and simplifies space operations. By taking the next logical step--use of the BNTR for propulsive capture of all payload elements into Mars orbit--the power available in Mars orbit grows to 150 kWe compared to 30 kWe for the DRM. Propulsive capture also eliminates the complex, higher risk aerobraking and capture maneuver which is replaced by a simpler reentry using a standardized, lower mass "aerodescent" shell. The attractiveness of the "all BNTR" option is further increased by the substitution of the lightweight, inflatable "TransHab" module in place of the heavier, hard-shell hab module. Use of TransHab introduces the potential for propulsive recovery and reuse of the BNTR/ERV. It also allows the crew to travel to and from Mar on the same BNTR transfer vehicle thereby cutting the duration of the ERV mission in half--from approximately 4.7 to 2.5 years. Finally, for difficult Mars options, such as Phobos rendezvous and sample return missions, volume (not mass) constraints limit the performance of the "all LH2" BNTR stage. The use of "LOX-augmented" NTR (LANTR) engines, operating at a modest oxygen-to-hydrogen mixutre ratio (MR) of 0.5, helps to increase "bulk" propellant density and total thrust during the TMI burn. On all subsequent burns, the bimodal LANTR engines operate on LH2 only (MR=0) to maximize vehicle performance while staying within the lift capability of two Magnum launches.

  4. 50 Years of Mars Exploration

    NASA Image and Video Library

    2015-08-20

    2015 marks 50 years of successful NASA missions to Mars starting with Mariner 4 in 1965. Since then, a total of 15 robotic missions led by various NASA centers have laid the groundwork for future human missions to the Red Planet. The journey to Mars continues with additional robotic missions planned for 2016 and 2020, and human missions in the 2030s.

  5. The Thermal Infrared Sensor onboard NASA's Mars 2020 Mission

    NASA Astrophysics Data System (ADS)

    Martinez, G.; Perez-Izquierdo, J.; Sebastian, E.; Ramos, M.; Bravo, A.; Mazo, M.; Rodriguez-Manfredi, J. A.

    2017-12-01

    NASA's Mars 2020 rover mission is scheduled for launch in July/August 2020 and will address key questions about the potential for life on Mars. The Mars Environmental Dynamics Analyzer (MEDA) is one of the seven instruments onboard the rover [1] and has been designed to assess the environmental conditions across the rover traverse. MEDA will extend the current record of in-situ meteorological measurements at the surface [2] to other locations on Mars. The Thermal InfraRed Sensor (TIRS) [3] is one of the six sensors comprising MEDA. TIRS will use three downward-looking channels to measure (1) the surface skin temperature (with high heritage from the Rover Environmental Monitoring Station onboard the Mars Science Laboratory mission [4]), (2) the upwelling thermal infrared radiation from the surface and (3) the reflected solar radiation at the surface, and two upward-looking channels to measure the (4) downwelling thermal infrared radiation at the surface and (5) the atmospheric temperature. In combination with other MEDA's sensors, TIRS will allow the quantification of the surface energy budget [5] and the determination of key geophysical properties of the terrain such as the albedo and thermal inertia with an unprecedented spatial resolution. Here we present a general description of the TIRS, with focus on its scientific requirements and results from field campaigns showing the performance of the different channels. References:[1] Rodríguez-Manfredi, J. A. et al. (2014), MEDA: An environmental and meteorological package for Mars 2020, LPSC, 45, 2837. [2] Martínez, G.M. et al. (2017), The Modern Near-Surface Martian Climate: A Review of In-situ Meteorological Data from Viking to Curiosity, Space Science Reviews, 1-44. [3] Pérez-Izquierdo, J. et al. (2017), The Thermal Infrared Sensor (TIRS) of the Mars Environmental Dynamics Analyzer (MEDA) Instrument onboard Mars 2020, IEEE. [4] Sebastián, E. et al. (2010), The Rover Environmental Monitoring Station Ground Temperature Sensor: A Pyrometer for Measuring Ground Temperature on Mars," Sensors, vol. 10(10), pp. 9211-9231. [5] Martínez, G. M. et al. (2014), Surface energy budget and thermal inertia at Gale Crater: Calculations from ground-based measurements, J.Geophys. Res. Planets, 119.

  6. A Mission Concept: Re-Entry Hopper-Aero-Space-Craft System on-Mars (REARM-Mars)

    NASA Technical Reports Server (NTRS)

    Davoodi, Faranak

    2013-01-01

    Future missions to Mars that would need a sophisticated lander, hopper, or rover could benefit from the REARM Architecture. The mission concept REARM Architecture is designed to provide unprecedented capabilities for future Mars exploration missions, including human exploration and possible sample-return missions, as a reusable lander, ascend/descend vehicle, refuelable hopper, multiple-location sample-return collector, laboratory, and a cargo system for assets and humans. These could all be possible by adding just a single customized Re-Entry-Hopper-Aero-Space-Craft System, called REARM-spacecraft, and a docking station at the Martian orbit, called REARM-dock. REARM could dramatically decrease the time and the expense required to launch new exploratory missions on Mars by making them less dependent on Earth and by reusing the assets already designed, built, and sent to Mars. REARM would introduce a new class of Mars exploration missions, which could explore much larger expanses of Mars in a much faster fashion and with much more sophisticated lab instruments. The proposed REARM architecture consists of the following subsystems: REARM-dock, REARM-spacecraft, sky-crane, secure-attached-compartment, sample-return container, agile rover, scalable orbital lab, and on-the-road robotic handymen.

  7. Status of robotic mission studies for the Space Exploration Initiative - 1991

    NASA Technical Reports Server (NTRS)

    Bourke, Roger D.; Dias, William C.; Golombek, Matthew P.; Pivirotto, Donna L.; Sturms, Francis M.; Hubbard, G. S.

    1991-01-01

    Results of studies of robotic missions to the moon and Mars planned under the U.S. Space Exploration Initiative are summarized. First, an overall strategy for small robotic missions to accomplish the information gathering required by human missions is reviewed, and the principal robotic mission requirements are discussed. The discussion covers the following studies: the Lunar Observer, the Mars Environmental Survey mission, Mars Sample Return missions using microtechnology, and payloads.

  8. Robotic missions to Mars - Paving the way for humans

    NASA Technical Reports Server (NTRS)

    Pivirotto, D. S.; Bourke, R. D.; Cunningham, G. E.; Golombek, M. P.; Sturms, F. M.; Kahl, R. C.; Lance, N.; Martin, J. S.

    1990-01-01

    NASA is in the planning stages of a program leading to the human exploration of Mars. A critical element in that program is a set of robotic missions that will acquire information on the Martian environment and test critical functions (such as aerobraking) at the planet. This paper presents some history of Mars missions, as well as results of recent studies of the Mars robotic missions that are under consideration as part of the exploration program. These missions include: (1) global synoptic geochemical and climatological characterization from orbit (Mars Observer), (2) global network of small meteorological and seismic stations, (3) sample returns, (4) reconnaissance orbiters and (5) rovers.

  9. Extraction and Capture of Water from Martian Regolith Experimental Proof-of-Concept

    NASA Technical Reports Server (NTRS)

    Linne, Diane; Kleinhenz, Julie; Bauman, Steve; Johnson, Kyle

    2016-01-01

    Mars Design Reference Architecture 5.0:Lists in-situ resource utilization (ISRU) as enabling for robust human Mars missionsLO2LCH4 ascent propulsion 25,000 kg oxygen from atmosphere for ascent and life support Atmospheric based ISRU processes less operationally complex than surface based limited concept evaluation to date and Mars surface water property and distribution uncertainty would not allow [Mars soil water processing] to be base lined at this time Limited Concept Evaluation to Date Lunar regolith O2 extraction processing experience Lunar regolith is fluidized and heated to high temperatures with H2 to produce H2O from iron-bearing minerals Mars similarity concept: Soil placed in fluidized bed reactor Heated to moderate temperatures Inert gas flow used to fluidize the bed and help with water desorption Challenges: High-temperature dusty seals Working gas requires downstream separation and recycling to reduce consumables loss Batch process heating thermally inefficient.

  10. Expert system isssues in automated, autonomous space vehicle rendezvous

    NASA Technical Reports Server (NTRS)

    Goodwin, Mary Ann; Bochsler, Daniel C.

    1987-01-01

    The problems involved in automated autonomous rendezvous are briefly reviewed, and the Rendezvous Expert (RENEX) expert system is discussed with reference to its goals, approach used, and knowledge structure and contents. RENEX has been developed to support streamlining operations for the Space Shuttle and Space Station program and to aid definition of mission requirements for the autonomous portions of rendezvous for the Mars Surface Sample Return and Comet Nucleus Sample return unmanned missions. The experience with REMEX to date and recommendations for further development are presented.

  11. Post-Flight EDL Entry Guidance Performance of the 2011 Mars Science Laboratory Mission

    NASA Technical Reports Server (NTRS)

    Mendeck, Gavin F.; McGrew, Lynn Craig

    2012-01-01

    The 2011 Mars Science Laboratory was the first successful Mars mission to attempt a guided entry which safely delivered the rover to a final position approximately 2 km from its target within a touchdown ellipse of 19.1 km x 6.9 km. The Entry Terminal Point Controller guidance algorithm is derived from the final phase Apollo Command Module guidance and, like Apollo, modulates the bank angle to control the range flown. For application to Mars landers which must make use of the tenuous Martian atmosphere, it is critical to balance the lift of the vehicle to minimize the range error while still ensuring a safe deploy altitude. An overview of the process to generate optimized guidance settings is presented, discussing improvements made over the last nine years. Key dispersions driving deploy ellipse and altitude performance are identified. Performance sensitivities including attitude initialization error and the velocity of transition from range control to heading alignment are presented. Just prior to the entry and landing of MSL in August 2012, the EDL team examined minute tuning of the reference trajectory for the selected landing site, analyzed whether adjustment of bank reversal deadbands were necessary, the heading alignment velocity trigger was in union with other parameters to balance the EDL risks, and the vertical L/D command limits. This paper details a preliminary postflight assessment of the telemetry and trajectory reconstruction that is being performed, and updates the information presented in the former paper Entry Guidance for the 2011 Mars Science Laboratory Mission (AIAA Atmospheric Flight Mechanics Conference; 8-11 Aug. 2011; Portland, OR; United States)

  12. Magnetic Mars Dust Removal Technology

    NASA Astrophysics Data System (ADS)

    Arias, F. J.; De las Heras, S. A.

    2018-04-01

    From the recorded data from recent Mars missions, there are substantial evidence that the dust of Mars is strongly magnetic. In this work we propose a novel, reliable, robust, and ad hoc technique for Mars dust removal for Mars Sample Return mission.

  13. Planetary Protection Provisions for the Mars 2020 Mission: Enabling Discovery by Constraining Contamination

    NASA Astrophysics Data System (ADS)

    Rummel, J. D.; Conley, C. A.

    2013-12-01

    The 2013-2022 NRC Decadal Survey named its #1 Flagship priority as a large, capable Mars rover that would be the first of a three-mission, multi-decadal effort to return samples from Mars. More recently, NASA's Mars Program has stated that a Mars rover mission known as 'Mars 2020' would be flown to Mars (in 2020) to accomplish a subset of the goals specified by the NRC, and the recent report of the Mars 2020 Science Definition Team (SDT) has recommended that the mission accomplish broad and rigorous in situ science, including seeking biosignatures, acquiring a diverse set of samples intended to address a range of Mars science questions and storing them in a cache for potential return to Earth at a later time, and other engineering goals to constrain costs and support future human exploration. In some ways Mars 2020 will share planetary protection requirements with the Mars Science Laboratory mission that landed in 2012, which included landing site constraints based on the presence of a perennial heat source (the MMRTG) aboard the lander/rover. In a very significant way, however, the presence of a sample-cache and the potential that Mars 2020 will be the first mission in the chain that will return a sample from Mars to Earth. Thus Mars 2020 will face more stringent requirements aimed at keeping the mission from returning Earth contamination with the samples from Mars. Mars 2020 will be looking for biosignatures of ancient life, on Mars, but will also need to be concerned with the potential to detect extant biosignatures or life itself within the sample that is eventually returned. If returned samples are able to unlock wide-ranging questions about the geology, surface processes, and habitability of Mars that cannot be answered by study of meteorites or current mission data, then either the returned samples must be free enough of Earth organisms to be releasable from a quarantine facility or the planned work of sample scientists, including high- and low-T geochemistry, igneous and sedimentary petrology, mineral spectroscopy, and astrobiology, will have to be accomplished within a containment facility. The returned samples also need to be clean of Earth organisms to avoid the potential that Earth contamination will mask the potential for martian life to be detected, allowing only non-conclusive or false-negative results. The requirements placed on the Mars 2020 mission to address contamination control in a life-detection framework will be one of the many challenges faced in this potential first step in Mars sample return.

  14. Proceedings of the Fourth International Conference on Mars Polar Science and Exploration

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Sessions in this conference include: Mars polar geology and glaciology; Mars and terrestrial radar investigations; Observations, nature, and evolution of the Martian seasonal polar caps; Mars' residual south polar cap; Climate change, ice core analysis, and the redistribution of volatiles on Mars; errestrial Mars analog environments; The Phoenix Scout mission and the nature of the near-polar environment; Moderated Discussion: Key Issues Regarding Phoenix Scout Mission and the nature of the near-polar environment; Panel Discussion: Key Issues in Mars Polar Science and Exploration; Mars Reconnaissance Orbiter investigations of the Martian polar regions and climate; Mars Polar Scout Mission concepts; and Panel Discussion: New perspectives on Mars polar science and exploration

  15. Planetary protection implementation on future Mars lander missions

    NASA Astrophysics Data System (ADS)

    Howell, Robert; Devincenzi, Donald L.

    1993-06-01

    A workshop was convened to discuss the subject of planetary protection implementation for Mars lander missions. It was sponsored and organized by the Exobiology Implementation Team of the U.S./Russian Joint Working Group on Space Biomedical and Life Support Systems. The objective of the workshop was to discuss planetary protection issues for the Russian Mars '94 mission, which is currently under development, as well as for additional future Mars lander missions including the planned Mars '96 and U.S. MESUR Pathfinder and Network missions. A series of invited presentations was made to ensure that workshop participants had access to information relevant to the planned discussions. The topics summarized in this report include exobiology science objectives for Mars exploration, current international policy on planetary protection, planetary protection requirements developed for earlier missions, mission plans and designs for future U.S. and Russian Mars landers, biological contamination of spacecraft components, and techniques for spacecraft bioload reduction. In addition, the recent recommendations of the U.S. Space Studies Board (SSB) on this subject were also summarized. Much of the discussion focused on the recommendations of the SSB. The SSB proposed relaxing the planetary protection requirements for those Mars lander missions that do not contain life detection experiments, but maintaining Viking-like requirements for those missions that do contain life detection experiments. The SSB recommendations were found to be acceptable as a guide for future missions, although many questions and concerns about interpretation were raised and are summarized. Significant among the concerns was the need for more quantitative guidelines to prevent misinterpretation by project offices and better access to and use of the Viking data base of bio-assays to specify microbial burden targets. Among the questions raised were how will the SSB recommendations be integrated with existing Committee on Space Research (COSPAR) policy and how will they apply to and affect Mars '94, Mars '96, MESUR Pathfinder, and MESUR Network missions? One additional topic briefly considered at the workshop was the identification of some issues related to planetary protection considerations for Mars sample return missions. These issues will form the basis for a follow-on joint U.S./Russian workshop on that subject.

  16. Planetary protection implementation on future Mars lander missions

    NASA Technical Reports Server (NTRS)

    Howell, Robert; Devincenzi, Donald L.

    1993-01-01

    A workshop was convened to discuss the subject of planetary protection implementation for Mars lander missions. It was sponsored and organized by the Exobiology Implementation Team of the U.S./Russian Joint Working Group on Space Biomedical and Life Support Systems. The objective of the workshop was to discuss planetary protection issues for the Russian Mars '94 mission, which is currently under development, as well as for additional future Mars lander missions including the planned Mars '96 and U.S. MESUR Pathfinder and Network missions. A series of invited presentations was made to ensure that workshop participants had access to information relevant to the planned discussions. The topics summarized in this report include exobiology science objectives for Mars exploration, current international policy on planetary protection, planetary protection requirements developed for earlier missions, mission plans and designs for future U.S. and Russian Mars landers, biological contamination of spacecraft components, and techniques for spacecraft bioload reduction. In addition, the recent recommendations of the U.S. Space Studies Board (SSB) on this subject were also summarized. Much of the discussion focused on the recommendations of the SSB. The SSB proposed relaxing the planetary protection requirements for those Mars lander missions that do not contain life detection experiments, but maintaining Viking-like requirements for those missions that do contain life detection experiments. The SSB recommendations were found to be acceptable as a guide for future missions, although many questions and concerns about interpretation were raised and are summarized. Significant among the concerns was the need for more quantitative guidelines to prevent misinterpretation by project offices and better access to and use of the Viking data base of bioassays to specify microbial burden targets. Among the questions raised were how will the SSB recommendations be integrated with existing Committee on Space Research (COSPAR) policy and how will they apply to and affect Mars '94, Mars '96, MESUR Pathfinder, and MESUR Network missions? One additional topic briefly considered at the workshop was the identification of some issues related to planetary protection considerations for Mars sample return missions. These issues will form the basis for a follow-on joint U.S./Russian workshop on that subject.

  17. Manned Mars mission cost estimate

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph; Smith, Keith

    1986-01-01

    The potential costs of several options of a manned Mars mission are examined. A cost estimating methodology based primarily on existing Marshall Space Flight Center (MSFC) parametric cost models is summarized. These models include the MSFC Space Station Cost Model and the MSFC Launch Vehicle Cost Model as well as other modes and techniques. The ground rules and assumptions of the cost estimating methodology are discussed and cost estimates presented for six potential mission options which were studied. The estimated manned Mars mission costs are compared to the cost of the somewhat analogous Apollo Program cost after normalizing the Apollo cost to the environment and ground rules of the manned Mars missions. It is concluded that a manned Mars mission, as currently defined, could be accomplished for under $30 billion in 1985 dollars excluding launch vehicle development and mission operations.

  18. Reliability and Qualification of Hardware to Enhance the Mission Assurance of JPL/NASA Projects

    NASA Technical Reports Server (NTRS)

    Ramesham, Rajeshuni

    2010-01-01

    Packaging Qualification and Verification (PQV) and life testing of advanced electronic packaging, mechanical assemblies (motors/actuators), and interconnect technologies (flip-chip), platinum temperature thermometer attachment processes, and various other types of hardware for Mars Exploration Rover (MER)/Mars Science Laboratory (MSL), and JUNO flight projects was performed to enhance the mission assurance. The qualification of hardware under extreme cold to hot temperatures was performed with reference to various project requirements. The flight like packages, assemblies, test coupons, and subassemblies were selected for the study to survive three times the total number of expected temperature cycles resulting from all environmental and operational exposures occurring over the life of the flight hardware including all relevant manufacturing, ground operations, and mission phases. Qualification/life testing was performed by subjecting flight-like qualification hardware to the environmental temperature extremes and assessing any structural failures, mechanical failures or degradation in electrical performance due to either overstress or thermal cycle fatigue. Experimental flight qualification test results will be described in this presentation.

  19. The Future of Human Exploration

    NASA Technical Reports Server (NTRS)

    Cooke, Doug

    2001-01-01

    This slide presentation reviews the near term future of human space exploration in terms of possible mission scenarios, propulsion technologies, orbital dynamics that lead to Low-Energy Transfer from Earth-Moon LI to Solar Libration Points and Return Potential Staging Point for Human Mars Missions. It also examines the required evolution of mission architecture, solar electric propulsion concept, vehicle concepts for future Mars missions, and an overview of a Mars Mission, Also in this presentation are pictures of several historic personages and occasions, and a view of a Mars Meteorite (i.e., ALH84001.0)

  20. World First MarsLink Mission Participants Learn and Enjoy Science

    ERIC Educational Resources Information Center

    Barry, Dana

    2005-01-01

    This article describes how students learn and experience the excitement of science by actively participating in the MarsLink Space Mission, an educational component of the National Aeronautics and Space Administration's (NASA) Mars Missions. This Mission has been made possible by Space Explorers, Inc., in collaboration with NASA. In the…

  1. Architectural design proposal for a Martian base to continue NASA Mars Design Reference Mission

    NASA Astrophysics Data System (ADS)

    Kozicki, Janek

    The issue of extraterrestrial bases has recently been a very vivid one. There are orbital stations currently existing and humans will travel to Mars around 2030. They will need stations established there, which will provide them the proper living conditions. Firstly, it might be a small module brought from Earth (e.g. NASA Mars Design Reference Mission module (DRM)), in later stages equivalents of Earth houses may be built from local resources. The goal of this paper is to propose an architectural design for an intermediate stage — for a larger habitable unit transported from Earth. It is inspired by terrestrial portable architecture ideas. A pneumatic structure requires small volume during transportation. However, it provides large habitable space after deployment. It is designed for transport by DRM transportation module and its deployment is considerable easy and brief. An architectural solution analogous to a terrestrial house with a studio and a workshop was assumed. Its form was a result of technical and environmental limitations, and the need for an ergonomic interior. The spatial placement of following zones was carefully considered: residential, agricultural and science, as well as a garage with a workshop, transportation routes, and a control and communication center. The issues of Life Support System, energy, food, water and waste recycling were also discussed. This Martian base was designed to be crewed by a team of eight people to stay on Mars for at least 1.5 year. An Open Plan architectural solution was assumed in pneumatic modules, with a high level of modularity. Walls of standardized sizes with zip-fasteners allow free rearrangement of the interior to adapt to a new situation (e.g. damage of one of the pneumatic modules or a psychological ,,need of a change"). The architectural design focuses on ergonomic and psychological aspects of longer stay in hostile Martian environment. This solution provides Martian crew with a comfortable habitable space larger than DRM modules. It is proposed to send this base in a DRM transportation module after the first successful human mission. The author of this paper hopes that this, or other similar Martian base designs will help establishing a permanent presence of humans on Mars.

  2. Mars Atmosphere Resource Verification INsitu (MARVIN) - In Situ Resource Demonstration for the Mars 2020 Mission

    NASA Technical Reports Server (NTRS)

    Sanders, Gerald B.; Araghi, Koorosh; Ess, Kim M.; Valencia, Lisa M.; Muscatello, Anthony C.; Calle, Carlos I.; Clark, Larry; Iacomini, Christie

    2014-01-01

    The making of oxygen from resources in the Martian atmosphere, known as In Situ Resource Utilization (ISRU), has the potential to provide substantial benefits for future robotic and human exploration. In particular, the ability to produce oxygen on Mars for use in propulsion, life support, and power systems can provide significant mission benefits such as a reducing launch mass, lander size, and mission and crew risk. To advance ISRU for possible incorporation into future human missions to Mars, NASA proposed including an ISRU instrument on the Mars 2020 rover mission, through an announcement of opportunity (AO). The purpose of the the Mars Atmosphere Resource Verification INsitu or (MARVIN) instrument is to provide the first demonstration on Mars of oxygen production from acquired and stored Martian atmospheric carbon dioxide, as well as take measurements of atmospheric pressure and temperature, and of suspended dust particle sizes and amounts entrained in collected atmosphere gases at different times of the Mars day and year. The hardware performance and environmental data obtained will be critical for future ISRU systems that will reduce the mass of propellants and other consumables launched from Earth for robotic and human exploration, for better understanding of Mars dust and mitigation techniques to improve crew safety, and to help further define Mars global circulation models and better understand the regional atmospheric dynamics on Mars. The technologies selected for MARVIN are also scalable for future robotic sample return and human missions to Mars using ISRU.

  3. Diverse Orbits Around Mars Graphic

    NASA Image and Video Library

    2015-05-04

    This graphic depicts the relative shapes and distances from Mars for five active orbiter missions plus the planet's two natural satellites. It illustrates the potential for intersections of the spacecraft orbits. The number of active orbiter missions at Mars increased from three to five in 2014. With the increased traffic, NASA has augmented a process for anticipating orbit intersections and avoiding collisions. NASA's Mars Odyssey and MRO (Mars Reconnaissance Orbiter) travel near-circular orbits. The European Space Agency's Mars Express, NASA's MAVEN (Mars Atmosphere and Volatile Evolution) and India's MOM (Mars Orbiter Mission), travel more elliptical orbits. Phobos and Deimos are the two natural moons of Mars. http://photojournal.jpl.nasa.gov/catalog/PIA19396

  4. Lessons Learned from Coordinating Relay Activities at Mars

    NASA Technical Reports Server (NTRS)

    Gladden, Roy E.; Hwang, Pauline; Waggoner, Bruce; McLaughlin, Bruce; Fieseler, Paul; Thomas, Reid; Bigwood, Maria; Herrera, Paul

    2005-01-01

    The Mission Management Office at the Jet Propulsion Laboratory was tasked with coordinating the relay of data between multiple spacecraft at Mars in support of the Mars Exploration Rover Missions in early 2004. The confluence of three orbiters (Mars Global Surveyor, Mars Odyssey, and Mars Express), two rovers (Spirit and Opportunity), and one lander (Beagle 2) has provided a challenging operational scenario that required careful coordination between missions to provide the necessary support and to avoid potential interference during simultaneous relay sessions. As these coordination efforts progressed, several important lessons were learned that should be applied to future Mars relay activities.

  5. Mass and Reliability System (MaRS)

    NASA Technical Reports Server (NTRS)

    Barnes, Sarah

    2016-01-01

    The Safety and Mission Assurance (S&MA) Directorate is responsible for mitigating risk, providing system safety, and lowering risk for space programs from ground to space. The S&MA is divided into 4 divisions: The Space Exploration Division (NC), the International Space Station Division (NE), the Safety & Test Operations Division (NS), and the Quality and Flight Equipment Division (NT). The interns, myself and Arun Aruljothi, will be working with the Risk & Reliability Analysis Branch under the NC Division's. The mission of this division is to identify, characterize, diminish, and communicate risk by implementing an efficient and effective assurance model. The team utilizes Reliability and Maintainability (R&M) and Probabilistic Risk Assessment (PRA) to ensure decisions concerning risks are informed, vehicles are safe and reliable, and program/project requirements are realistic and realized. This project pertains to the Orion mission, so it is geared toward a long duration Human Space Flight Program(s). For space missions, payload is a critical concept; balancing what hardware can be replaced by components verse by Orbital Replacement Units (ORU) or subassemblies is key. For this effort a database was created that combines mass and reliability data, called Mass and Reliability System or MaRS. The U.S. International Space Station (ISS) components are used as reference parts in the MaRS database. Using ISS components as a platform is beneficial because of the historical context and the environment similarities to a space flight mission. MaRS uses a combination of systems: International Space Station PART for failure data, Vehicle Master Database (VMDB) for ORU & components, Maintenance & Analysis Data Set (MADS) for operation hours and other pertinent data, & Hardware History Retrieval System (HHRS) for unit weights. MaRS is populated using a Visual Basic Application. Once populated, the excel spreadsheet is comprised of information on ISS components including: operation hours, random/nonrandom failures, software/hardware failures, quantity, orbital replaceable units (ORU), date of placement, unit weight, frequency of part, etc. The motivation for creating such a database will be the development of a mass/reliability parametric model to estimate mass required for replacement parts. Once complete, engineers working on future space flight missions will have access a mean time to failures and on parts along with their mass, this will be used to make proper decisions for long duration space flight missions

  6. Mars Observer: Mission toward a basic understanding of Mars

    NASA Technical Reports Server (NTRS)

    Albee, Arden L.

    1992-01-01

    The Mars Observer Mission will provide a spacecraft platform about Mars from which the entire Martian surface and atmosphere will be observed and mapped by remote sensing instruments for at least 1 Martian year. The scientific objectives for the Mission emphasize qualitative and quantitative determination of the elemental and mineralogical composition of the surface; measurement of the global surface topography, gravity field, and magnetic field; and the development of a synoptic data base of climatological conditions. The Mission will provide basic global understanding of Mars as it exists today and will provide a framework for understanding its past.

  7. The Deep Space Gateway: The Next Stepping Stone to Mars

    NASA Astrophysics Data System (ADS)

    Cassady, R. J.; Carberry, C.; Cichan, T.

    2018-02-01

    Human missions to Mars will benefit from precursor missions such as the Deep Space Gateway (DSG) that achieve important science and human health and safety milestones. The DSG can perform lunar science and prepare for future Mars mission science.

  8. Dust Storm Impacts on Human Mars Mission Equipment and Operations

    NASA Astrophysics Data System (ADS)

    Rucker, M. A.

    2017-06-01

    NASA has accumulated a wealth of experience between the Apollo program and robotic Mars rover programs, but key differences between those missions and a human Mars mission that will require unique approaches to mitigate potential dust storm concerns.

  9. Proceedings of the 39th Lunar and Planetary Science Conference

    NASA Technical Reports Server (NTRS)

    2008-01-01

    Sessions with oral presentations include: A SPECIAL SESSION: MESSENGER at Mercury, Mars: Pingos, Polygons, and Other Puzzles, Solar Wind and Genesis: Measurements and Interpretation, Asteroids, Comets, and Small Bodies, Mars: Ice On the Ground and In the Ground, SPECIAL SESSION: Results from Kaguya (SELENE) Mission to the Moon, Outer Planet Satellites: Not Titan, Not Enceladus, SPECIAL SESSION: Lunar Science: Past, Present, and Future, Mars: North Pole, South Pole - Structure and Evolution, Refractory Inclusions, Impact Events: Modeling, Experiments, and Observations, Mars Sedimentary Processes from Victoria Crater to the Columbia Hills, Formation and Alteration of Carbonaceous Chondrites, New Achondrite GRA 06128/GRA 06129 - Origins Unknown, The Science Behind Lunar Missions, Mars Volcanics and Tectonics, From Dust to Planets (Planetary Formation and Planetesimals):When, Where, and Kaboom! Astrobiology: Biosignatures, Impacts, Habitability, Excavating a Comet, Mars Interior Dynamics to Exterior Impacts, Achondrites, Lunar Remote Sensing, Mars Aeolian Processes and Gully Formation Mechanisms, Solar Nebula Shake and Bake: Mixing and Isotopes, Lunar Geophysics, Meteorites from Mars: Shergottite and Nakhlite Invasion, Mars Fluvial Geomorphology, Chondrules and Chondrule Formation, Lunar Samples: Chronology, Geochemistry, and Petrology, Enceladus, Venus: Resurfacing and Topography (with Pancakes!), Overview of the Lunar Reconnaissance Orbiter Mission, Mars Sulfates, Phyllosilicates, and Their Aqueous Sources, Ordinary and Enstatite Chondrites, Impact Calibration and Effects, Comparative Planetology, Analogs: Environments and Materials, Mars: The Orbital View of Sediments and Aqueous Mineralogy, Planetary Differentiation, Titan, Presolar Grains: Still More Isotopes Out of This World, Poster sessions include: Education and Public Outreach Programs, Early Solar System and Planet Formation, Solar Wind and Genesis, Asteroids, Comets, and Small Bodies, Carbonaceous Chondrites, Chondrules and Chondrule Formation, Chondrites, Refractory Inclusions, Organics in Chondrites, Meteorites: Techniques, Experiments, and Physical Properties, MESSENGER and Mercury, Lunar Science Present: Kaguya (SELENE) Results, Lunar Remote Sensing: Basins and Mapping of Geology and Geochemistry, Lunar Science: Dust and Ice, Lunar Science: Missions and Planning, Mars: Layered, Icy, and Polygonal, Mars Stratigraphy and Sedimentology, Mars (Peri)Glacial, Mars Polar (and Vast), Mars, You are Here: Landing Sites and Imagery, Mars Volcanics and Magmas, Mars Atmosphere, Impact Events: Modeling, Experiments, and Observation, Ice is Nice: Mostly Outer Planet Satellites, Galilean Satellites, The Big Giant Planets, Astrobiology, In Situ Instrumentation, Rocket Scientist's Toolbox: Mission Science and Operations, Spacecraft Missions, Presolar Grains, Micrometeorites, Condensation-Evaporation: Stardust Ties, Comet Dust, Comparative Planetology, Planetary Differentiation, Lunar Meteorites, Nonchondritic Meteorites, Martian Meteorites, Apollo Samples and Lunar Interior, Lunar Geophysics, Lunar Science: Geophysics, Surface Science, and Extralunar Components, Mars, Remotely, Mars Orbital Data - Methods and Interpretation, Mars Tectonics and Dynamics, Mars Craters: Tiny to Humongous, Mars Sedimentary Mineralogy, Martian Gullies and Slope Streaks, Mars Fluvial Geomorphology, Mars Aeolian Processes, Mars Data and Mission,s Venus Mapping, Modeling, and Data Analysis, Titan, Icy Dwarf Satellites, Rocket Scientist's Toolbox: In Situ Analysis, Remote Sensing Approaches, Advances, and Applications, Analogs: Sulfates - Earth and Lab to Mars, Analogs: Remote Sensing and Spectroscopy, Analogs: Methods and Instruments, Analogs: Weird Places!. Print Only Early Solar System, Solar Wind, IDPs, Presolar/Solar Grains, Stardust, Comets, Asteroids, and Phobos, Venus, Mercury, Moon, Meteorites, Mars, Astrobiology, Impacts, Outer Planets, Satellites, and Rings, Support for Mission Operations, Analog Education and Public Outreach.

  10. Mars Helicopter Technology Demonstration

    NASA Image and Video Library

    2018-05-11

    The Mars Helicopter is a technology demonstration that will fly as a secondary payload with the Mars 2020 mission. It will demonstrate the potential of aerial flight on Mars, which may enable more ambitious missions in the future.

  11. Impact of lunar and planetary missions on the space station: Preliminary STS logistics report

    NASA Technical Reports Server (NTRS)

    1984-01-01

    Space station requirements for lunar and planetary missions are discussed. Specific reference is made to projected Ceres and Kopff missions; Titan probes; Saturn and Mercury orbiters; and a Mars sample return mission. Such requirements as base design; station function; program definition; mission scenarios; uncertainties impact; launch manifest and mission schedule; and shuttle loads are considered. It is concluded that: (1) the impact of the planetary missions on the space station is not large when compared to the lunar base; (2) a quarantine module may be desirable for sample returns; (3) the Ceres and Kopff missions require the ability to stack and checkout two-stage OTVs; and (4) two to seven manweeks of on-orbit work are required of the station crew to launch a mission and, with the exception of the quarantine module, dedicated crew will not be required.

  12. Evolvable Mars Campaign Long Duration Habitation Strategies: Architectural Approaches to Enable Human Exploration Missions

    NASA Technical Reports Server (NTRS)

    Simon, Matthew A.; Toups, Larry; Howe, A. Scott; Wald, Samuel I.

    2015-01-01

    The Evolvable Mars Campaign (EMC) is the current NASA Mars mission planning effort which seeks to establish sustainable, realistic strategies to enable crewed Mars missions in the mid-2030s timeframe. The primary outcome of the Evolvable Mars Campaign is not to produce "The Plan" for sending humans to Mars, but instead its intent is to inform the Human Exploration and Operations Mission Directorate near-term key decisions and investment priorities to prepare for those types of missions. The FY'15 EMC effort focused upon analysis of integrated mission architectures to identify technically appealing transportation strategies, logistics build-up strategies, and vehicle designs for reaching and exploring Mars moons and Mars surface. As part of the development of this campaign, long duration habitats are required which are capable of supporting crew with limited resupply and crew abort during the Mars transit, Mars moons, and Mars surface segments of EMC missions. In particular, the EMC design team sought to design a single, affordable habitation system whose manufactured units could be outfitted uniquely for each of these missions and reused for multiple crewed missions. This habitat system must provide all of the functionality to safely support 4 crew for long durations while meeting mass and volume constraints for each of the mission segments set by the chosen transportation architecture and propulsion technologies. This paper describes several proposed long-duration habitation strategies to enable the Evolvable Mars Campaign through improvements in mass, cost, and reusability, and presents results of analysis to compare the options and identify promising solutions. The concepts investigated include several monolithic concepts: monolithic clean sheet designs, and concepts which leverage the co-manifested payload capability of NASA's Space Launch System (SLS) to deliver habitable elements within the Universal Payload Adaptor between the SLS upper stage and the Orion/Service module on the top of the vehicle. Multiple modular habitat options for Mars surface and in-space missions are also considered with various functionality and volume splits between modules to find the best balance of reducing the single largest mass which must be delivered to a destination and reducing the number of separate elements which must be launched. Analysis results presented for each of these concepts in this paper include mass/volume/power sizing using parametric sizing tools, identification of unique operational constraints, and limited comments on the additional impacts of reusability/dormancy on system design. Finally, recommendations will be made for promising solutions which will be carried forward for consideration in the Evolvable Mars Campaign work.

  13. Exobiology on Mars

    NASA Technical Reports Server (NTRS)

    Devincenzi, D. L. (Editor); Marshall, J. R. (Editor); Andersen, D. (Editor)

    1990-01-01

    Descriptions of several instrument concepts that were generated during a workshop entitled, Exobiology Instrument Concepts for a Soviet Mars 94/94 Mission, held at NASA Ames Research Center in 1989 are presented. The objective was to define and describe instrument concepts for exobiology and related science that would be compatible with the mission types under discussion for the 1994 and 1996 Soviet Mars missions. Experiments that use existing technology were emphasized. The concepts discussed could also be used on U.S. missions that follow Mars Observer.

  14. Selecting a landing site of astrobiological interest for Mars landers and sample return missions

    NASA Astrophysics Data System (ADS)

    Wills, D.; Monaghan, E.; Foing, B. H.

    2008-09-01

    Abstract The landscape of Mars, despite its apparent hostility to life, is riddled with geological and mineralogical signs of past or present hydrological activity. As such, it is a key target for astrobiological exploration. There are, however, many factors that will need to be considered when planning in-situ and sample return missions, if these missions are indeed to adequately exploit the science potential of this intriguing world. These will not only take into account the environment of the landing site in terms of topography and ambient atmosphere etc., but also the geochemical make up of the surface regolith, evidence of hydrological processes and various other considerations. The knowledge base in all aspects of Martian science is being added to on an almost daily basis, and the aim of this work is to combine data and studies to nominate top priority landing locations for the search for evidence of life on Mars. We report in particular on science and technical criteria and our data analysis for sites of astrobiological interest. This includes information from previous missions (such as Mars Express, MGS, Odyssey, MRO and MER rovers) on mineralogical composition, geomorphology, evidence from past water history from imaging and spectroscopic data, and existence of in-situ prior information from landers and rovers (concerning evidences for volatiles, organics and habitability conditions). We discuss key mission objectives, and assess what sort of sites should be targeted in the light of these. We consider the accessibility of chosen locations, taking into account difficulties presented in accessing the polar regions and other regions of high altitude. We describe what additional measurements are needed, and outline the technical and scientific operations requirements of such in-situ landers and sample return missions. Approach In the first step of this study we focus on the science objectives of in-situ and sample return missions to Mars. We investigate the evidence for extinct or extant life, propose a criteria for astrobiological interest, and characterise landing sites in the light of this criteria. This first step thus focuses on the question of where such missions should land, and why. In the second step, we extend this analysis into utilising real data to design mission scenarios for each of the proposed sites. This further step takes into account the safety, instruments and payloads, as well as the technological and engineering constraints of such missions. In this way, the second step addresses the question of what could be done, and how, once the landing sites have been chosen. In the final step we conduct a comparative study of in-situ and sample return missions with reference to the candidate sites.

  15. A Lean, Fast Mars Round-trip Mission Architecture: Using Current Technologies for a Human Mission in the 2030s

    NASA Technical Reports Server (NTRS)

    Bailey, Lora; Folta, David; Barbee, Brent W.; Vaughn, Frank; Kirchman, Frank; Englander, Jacob; Campbell, Bruce; Thronson, Harley; Lin, Tzu Yu

    2013-01-01

    We present a lean fast-transfer architecture concept for a first human mission to Mars that utilizes current technologies and two pivotal parameters: an end-to-end Mars mission duration of approximately one year, and a deep space habitat of approximately 50 metric tons. These parameters were formulated by a 2012 deep space habitat study conducted at the NASA Johnson Space Center (JSC) that focused on a subset of recognized high- engineering-risk factors that may otherwise limit space travel to destinations such as Mars or near-Earth asteroid (NEA)s. With these constraints, we model and promote Mars mission opportunities in the 2030s enabled by a combination of on-orbit staging, mission element pre-positioning, and unique round-trip trajectories identified by state-of-the-art astrodynamics algorithms.

  16. Martian Multimedia: The Agony and Ecstasy of Communicating Real-Time, Authentic Science During the Phoenix Mars Mission

    NASA Astrophysics Data System (ADS)

    Bitter, C.; Buxner, S. R.

    2009-03-01

    The Phoenix Mars Mission faced robust communication challenges requiring real-time solutions. Managing the message from Mars and ensuring the highest quality of science data and news releases were our top priorities during mission surface operations.

  17. The Designing of the Mission to Mars for the Siol Delivery by the Electric Propulsion Spacecraft

    NASA Astrophysics Data System (ADS)

    Starinova, O. L.; Gao, Ch.; Kurochkin, D. V.; Yudong, H.

    2018-04-01

    The effectiveness of the mission to return soil from Mars depends on design and trajectory parameters.The problem of comprehensive optimization of the low-thrust mission Earth-Mars-Earth is formulated and solved in this paper.

  18. Mars Telecom Orbiter mission operations concepts

    NASA Technical Reports Server (NTRS)

    Deutsch, Marie-Jose; Komarek, Tom; Lopez, Saturnino; Townes, Steve; Synnott, Steve; Austin, Richard; Guinn, Joe; Varghese, Phil; Edwards, Bernard; Bondurant, Roy; hide

    2004-01-01

    The Mars Telecom Orbiter (MTO) relay capability enables next decadal missions at Mars, collecting gigabits of data a day to be relayed back at speeds exceeding 4 Mbps and it facilitates small missions whose limited resources do not permit them to have a direct link to Earth.

  19. The Mars Technology Program

    NASA Technical Reports Server (NTRS)

    Hayati, Samad A.

    2002-01-01

    Future Mars missions require new capabilities that currently are not available. The Mars Technology Program (MTP) is an integral part of the Mars Exploration Program (MEP). Its sole purpose is to assure that required technologies are developed in time to enable the baselined and future missions. The MTP is a NASA-wide technology development program managed by JPL. It is divided into a Focused Program and a Base Program. The Focused Program is tightly tied to the proposed Mars Program mission milestones. It involves time-critical deliverables that must be developed in time for infusion into the proposed Mars 2005, and, 2009 missions. In addition a technology demonstration mission by AFRL will test a LIDAR as part of a joint NASNAFRL experiment. This program bridges the gap between technology and projects by vertically integrating the technology work with pre-project development in a project-like environment with critical dates for technology infusion. A Base Technology Program attacks higher riskhigher payoff technologies not in the critical path of missions.

  20. Human exploration mission studies

    NASA Technical Reports Server (NTRS)

    Cataldo, Robert L.

    1989-01-01

    The Office of Exploration has established a process whereby all NASA field centers and other NASA Headquarters offices participate in the formulation and analysis of a wide range of mission strategies. These strategies were manifested into specific scenarios or candidate case studies. The case studies provided a systematic approach into analyzing each mission element. First, each case study must address several major themes and rationale including: national pride and international prestige, advancement of scientific knowledge, a catalyst for technology, economic benefits, space enterprise, international cooperation, and education and excellence. Second, the set of candidate case studies are formulated to encompass the technology requirement limits in the life sciences, launch capabilities, space transfer, automation, and robotics in space operations, power, and propulsion. The first set of reference case studies identify three major strategies: human expeditions, science outposts, and evolutionary expansion. During the past year, four case studies were examined to explore these strategies. The expeditionary missions include the Human Expedition to Phobos and Human Expedition to Mars case studies. The Lunar Observatory and Lunar Outpost to Early Mars Evolution case studies examined the later two strategies. This set of case studies established the framework to perform detailed mission analysis and system engineering to define a host of concepts and requirements for various space systems and advanced technologies. The details of each mission are described and, specifically, the results affecting the advanced technologies required to accomplish each mission scenario are presented.

  1. Mars 2001 Cruise Phase Radiation Measurments

    NASA Technical Reports Server (NTRS)

    Turner, R. E.; Badhwar, G. D.

    1999-01-01

    Mars 2001 presents an exciting opportunity for advances in radiation risk management of a future human mission to Mars. The mission timing is particularly fortuitous, coming just after solar maxinuun, when there will be a high probability to observe significant solar particle events (SPEs). A major objective of this mission is to characterize the Martian radiation environment to support future human missions to Mars. In addition, the MARIE instruments on the Lander and Orbiter, designed to measure the energetic particle flux at Mars, can be used during the cruise phase to provide multipoint observations of SPEs in the critical region of the heliosphere (1 to 1.5 AU) needed to reduce the in-flight radiation risk to a future Mars-bound crew.

  2. Mission to Mars using integrated propulsion concepts: considerations, opportunities, and strategies.

    PubMed

    Accettura, Antonio G; Bruno, Claudio; Casotto, Stefano; Marzari, Francesco

    2004-04-01

    The aim of this paper is to evaluate the feasibility of a mission to Mars using the Integrated Propulsion Systems (IPS) which means to couple Nuclear-MPD-ISPU propulsion systems. In particular both mission analysis and propulsion aspects are analyzed together with technological aspects. Identifying possible mission scenarios will lead to the study of possible strategies for Mars Exploration and also of methods for reducing cost. As regard to IPS, the coupling between Nuclear Propulsion (Rubbia's engine) and Superconductive MPD propulsion is considered for the Earth-Mars trajectories: major emphasis is given to the advantages of such a system. The In Situ Resource Utilization (ISRU) concerns on-Mars operations; In Situ Propellant Utilization (ISPU) is foreseen particularly for LOX-CH4 engines for Mars Ascent Vehicles and this possibility is analyzed from a technological point of view. Tether Systems are also considered during interplanetary trajectories and as space elevators on Mars orbit. Finally strategic considerations associated to this mission are considered also. c2003 Elsevier Ltd. All rights reserved.

  3. Affordable Exploration of Mars: Recommendations from a Community Workshop

    NASA Technical Reports Server (NTRS)

    Thronson, Harley A.; Carberry, Chris; Cassady, R. Joseph; Cooke, Doug; Kirkpatrick, Jim; Perino, Maria Antonietta; Raftery, Michael; Westenberg, Artemis; Zucker, Richard

    2014-01-01

    There is a growing opinion that within two decades initial human missions to Mars are affordable under plausible budget scenarios, with sustained international participation, and --- especially --- without requiring those first missions to achieve a burdensome number of goals. In response to this view, a group of experts from the Mars exploration stakeholder communities attended the "Affording Mars" workshop at George Washington University in December 2013. Participants reviewed scenarios for proposed affordable and sustainable human and robotic exploration of Mars, the role of the International Space Station as the essential early step toward humans to Mars, possible "bridge" or "transition" missions in the 2020s, key capabilities required for affordable initial missions, international partnerships, and usable definitions of affordability and sustainability. We report here the findings, observations, and recommendations that were agreed to at that workshop. In the context of affordable early missions to Mars, we also discuss the recent report of the National Research Council on human space flight and a pair of recent scenarios that appear to promise reduced costs.

  4. Mars Ascent Vehicle Test Requirements and Terrestrial Validation

    NASA Technical Reports Server (NTRS)

    Dankanich, John W.; Cathey, Henry M.; Smith, David A.

    2011-01-01

    The Mars robotic sample return mission has been a potential flagship mission for NASA s science mission directorate for decades. The Mars Exploration Program and the planetary science decadal survey have highlighted both the science return of the Mars Sample Return mission, but also the need for risk reduction through technology development. One of the critical elements of the MSR mission is the Mars Ascent Vehicle, which must launch the sample from the surface of Mars and place it into low Mars orbit. The MAV has significant challenges to overcome due to the Martian environments and the Entry Descent and Landing system constraints. Launch vehicles typically have a relatively low success probability for early flights, and a thorough system level validation is warranted. The MAV flight environments are challenging and in some cases impossible to replicate terrestrially. The expected MAV environments have been evaluated and a first look of potential system test options has been explored. The terrestrial flight requirements and potential validation options are presented herein.

  5. Cars on Mars

    NASA Technical Reports Server (NTRS)

    Landis, Geoffrey A.

    2002-01-01

    Mars is one of the most fascinating planets in the solar system, featuring an atmosphere, water, and enormous volcanoes and canyons. The Mars Pathfinder, Global Surveyor, and Odyssey missions mark the first wave of the Planet Earth's coming invasion of the red planet, changing our views of the past and future of the planet and the possibilities of life. Scientist and science-fiction writer Geoffrey A. Landis will present experiences on the Pathfinder mission, the challenges of using solar power on the surface of Mars, and present future missions to Mars such as the upcoming Mars Twin Rovers, which will launch two highly-capable vehicles in 2003 to explore the surface of Mars.

  6. Mars Observer Mission: Mapping the Martian World

    NASA Technical Reports Server (NTRS)

    1992-01-01

    The 1992 Mars Observer Mission is highlighted in this video overview of the mission objectives and planning. Using previous photography and computer graphics and simulation, the main objectives of the 687 day (one Martian year) consecutive orbit by the Mars Observer Satellite around Mars are explained. Dr. Arden Albee, the project scientist, speaks about the pole-to-pole mapping of the Martian surface topography, the planned relief maps, the chemical and mineral composition analysis, the gravity fields analysis, and the proposed search for any Mars magnetic fields.

  7. The Exploration of Mars by Humans: Why Mars? Why Humans?

    NASA Technical Reports Server (NTRS)

    Levine, Joel S.

    2011-01-01

    As we commemorate the 50th anniversary of Yuri Gagarin's historic flight in 1961, the first flight of a human in space, plans are underway for another historic human mission. Plans are being developed for a human mission to Mars. Once we reach Mars, the human species will become the first two-planet species. Both the Bush Administration (in 2004) and the Obama Administration (in 2010) proposed a human mission to Mars as a national goal of the United States.

  8. Mars Curiosity mission

    NASA Image and Video Library

    2012-08-04

    NASA welcomed hundreds of children and accompanying adults to its INFINITY visitor center on Aug. 4, offering Mars-related activities that focused attention on the space agency's Curiosity mission to the Red Planet. Parents and children, such as Myron and Trey (age 3) Cummings, enjoyed exploring Mars using an interactive touch table (top right photo). Midway through the day of activities, visitors in the Science on a Sphere auditorium also enjoyed a presentation on Mars and the Curiosity mission by Dr. Steven Williams, a NASA expert on Mars.

  9. Mars Curiosity mission

    NASA Image and Video Library

    2012-08-04

    NASA welcomed hundreds of children and accompanying adults to its INFINITY visitor center on Aug. 4, offering Mars-related activities that focused attention on the space agency's Curiosity mission to the Red Planet. Parents and children, such as Myron and Trey (age 3) Cummings, enjoyed exploring Mars using an interactive touch table. Midway through the day of activities, visitors in the Science on a Sphere auditorium also enjoyed a presentation on Mars and the Curiosity mission by Dr. Steven Williams, a NASA expert on Mars.

  10. Pioneer Mars surface penetrator mission. Mission analysis and orbiter design

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The Mars Surface Penetrator mission was designed to provide a capability for multiple and diverse subsurface science measurements at a low cost. Equipment required to adapt the Pioneer Venus spacecraft for the Mars mission is described showing minor modifications to hardware. Analysis and design topics which are similar and/or identical to the Pioneer Venus program are briefly discussed.

  11. Mars Global Reference Atmospheric Model (Mars-GRAM 2005) Applications for Mars Science Laboratory Mission Site Selection Processes

    NASA Technical Reports Server (NTRS)

    Justh, H. L.; Justus, C. G.

    2007-01-01

    The new Mars-GRAM auxiliary profile capability, using data from TES observations, mesoscale model output, or other sources, allows a potentially higher fidelity representation of the atmosphere, and a more accurate way of estimating inherent uncertainty in atmospheric density and winds. Figure 3 indicates that, with nominal value rpscale=1, Mars-GRAM perturbations would tend to overestimate observed or mesoscale-modeled variability. To better represent TES and mesoscale model density perturbations, rpscale values as low as about 0.4 could be used. Some trajectory model implementations of Mars-GRAM allow the user to dynamically change rpscale and rwscale values with altitude. Figure 4 shows that an mscale value of about 1.2 would better replicate wind standard deviations from MRAMS or MMM5 simulations at the Gale, Terby, or Melas sites. By adjusting the rpscale and rwscale values in Mars-GRAM based on figures such as Figure 3 and 4, we can provide more accurate end-to-end simulations for EDL at the candidate MSL landing sites.

  12. Mission Design Considerations for Mars Cargo of the Human Spaceflight Architecture Team's Evolvable Mars Campaign

    NASA Technical Reports Server (NTRS)

    Sjauw, Waldy K.; McGuire, Melissa L.; Freeh, Joshua E.

    2016-01-01

    Recent NASA interest in human missions to Mars has led to an Evolvable Mars Campaign by the agency's Human Architecture Team. Delivering the crew return propulsion stages and Mars surface landers, SEP based systems are employed because of their high specific impulse characteristics enabling missions requiring less propellant although with longer transfer times. The Earth departure trajectories start from an SLS launch vehicle delivery orbit and are spiral shaped because of the low SEP thrust. Previous studies have led to interest in assessing the divide in trip time between the Earth departure and interplanetary legs of the mission for a representative SEP cargo vehicle.

  13. Manned Mars Explorer project: Guidelines for a manned mission to the vicinity of Mars using Phobos as a staging outpost; schematic vehicle designs considering chemical and nuclear electric propulsion

    NASA Technical Reports Server (NTRS)

    Nolan, Sean; Neubek, Deb; Baxmann, C. J.

    1988-01-01

    The Manned Mars Explorer (MME) project responds to the fundamental problems of sending human beings to Mars in a mission scenario and schematic vehicle designs. The mission scenario targets an opposition class Venus inbound swingby for its trajectory with concentration on Phobos and/or Deimos as a staging base for initial and future Mars vicinity operations. Optional vehicles are presented as a comparison using nuclear electric power/propulsion technology. A Manned Planetary Vehicle and Crew Command Vehicle are used to accomplish the targeted mission. The Manned Planetary Vehicle utilizes the mature technology of chemical propulsion combined with an advanced aerobrake, tether and pressurized environment system. The Crew Command Vehicle is the workhorse of the mission performing many different functions including a manned Mars landing, and Phobos rendezvous.

  14. Trajectory and navigation system design for robotic and piloted missions to Mars

    NASA Technical Reports Server (NTRS)

    Thurman, S. W.; Matousek, S. E.

    1991-01-01

    Future Mars exploration missions, both robotic and piloted, may utilize Earth to Mars transfer trajectories that are significantly different from one another, depending upon the type of mission being flown and the time period during which the flight takes place. The use of new or emerging technologies for future missions to Mars, such as aerobraking and nuclear rocket propulsion, may yield navigation requirements that are much more stringent than those of past robotic missions, and are very difficult to meet for some trajectories. This article explores the interdependencies between the properties of direct Earth to Mars trajectories and the Mars approach navigation accuracy that can be achieved using different radio metric data types, such as ranging measurements between an approaching spacecraft and Mars orbiting relay satellites, or Earth based measurements such as coherent Doppler and very long baseline interferometry. The trajectory characteristics affecting navigation performance are identified, and the variations in accuracy that might be experienced over the range of different Mars approach trajectories are discussed. The results predict that three sigma periapsis altitude navigation uncertainties of 2 to 10 km can be achieved when a Mars orbiting satellite is used as a navigation aid.

  15. Alternate Approaches to Exploration: The Single Crew Module Concept

    NASA Technical Reports Server (NTRS)

    Chambliss, Joe

    2011-01-01

    The Cx Program envisioned exploration of the moon and mars using an extrapolation of the Apollo approach. If new technology development initiatives are successful, they will provide capabilities that can enable alternate approaches. This presentation will provide a brief overview of the Cx approaches for lunar and Mars missions and some of the alternatives that were considered. Then an alternative approach referred to as a Single Crew Module approach is described. The SCM concept employs new technologies in a way that could reduce exploration cost and possibly schedule. Options to the approaches will be presented and discussed.

  16. The location of Airy-0, the Mars prime meridian reference, from stereo photogrammetric processing of THEMIS IR imaging and digital elevation data

    NASA Astrophysics Data System (ADS)

    Duxbury, T. C.; Christensen, P.; Smith, D. E.; Neumann, G. A.; Kirk, R. L.; Caplinger, M. A.; Albee, A. A.; Seregina, N. V.; Neukum, G.; Archinal, B. A.

    2014-12-01

    The small crater Airy-0 was selected from Mariner 9 images to be the reference for the Mars prime meridian. Initial analyses in the year 2000 tied Viking Orbiter and Mars Orbiter Camera images of Airy-0 to the evolving Mars Orbiter Laser Altimeter global digital terrain model to update the location of Airy-0. Based upon this tie and radiometric tracking of landers/rovers from Earth, new expressions for the Mars spin axis direction, spin rate, and prime meridian epoch value were produced to define the orientation of the Martian surface in inertial space over time. Since the Mars Global Surveyor mission and Mars Orbiter Laser Altimeter global digital terrain model were completed some time ago, a more exhaustive study has been performed to determine the accuracy of the Airy-0 location and orientation of Mars at the standard epoch. Thermal Emission Imaging System (THEMIS) IR image cubes of the Airy and Gale crater regions were tied to the global terrain grid using precision stereo photogrammetric image processing techniques. The Airy-0 location was determined to be about 0.001° east of its predicted location using the currently defined International Astronomical Union (IAU) prime meridian location. Information on this new location and how it was derived will be provided to the NASA Mars Exploration Program Geodesy and Cartography Working Group for their assessment. This NASA group will make a recommendation to the IAU Working Group on Cartographic Coordinates and Rotational Elements to update the expression for the Mars spin axis direction, spin rate, and prime meridian location.

  17. Medical System Concept of Operations for Mars Exploration Missions

    NASA Technical Reports Server (NTRS)

    Urbina, Michelle; Rubin, D.; Hailey, M.; Reyes, D.; Antonsen, Eric

    2017-01-01

    Future exploration missions will be the first time humanity travels beyond Low Earth Orbit (LEO) since the Apollo program, taking us to cis-lunar space, interplanetary space, and Mars. These long-duration missions will cover vast distances, severely constraining opportunities for emergency evacuation to Earth and cargo resupply opportunities. Communication delays and blackouts between the crew and Mission Control will eliminate reliable, real-time telemedicine consultations. As a result, compared to current LEO operations onboard the International Space Station, exploration mission medical care requires an integrated medical system that provides additional in-situ capabilities and a significant increase in crew autonomy. The Medical System Concept of Operations for Mars Exploration Missions illustrates how a future NASA Mars program could ensure appropriate medical care for the crew of this highly autonomous mission. This Concept of Operations document, when complete, will document all mission phases through a series of mission use case scenarios that illustrate required medical capabilities, enabling the NASA Human Research Program (HRP) Exploration Medical Capability (ExMC) Element to plan, design, and prototype an integrated medical system to support human exploration to Mars.

  18. NASA Design Projects at UC Berkeley for NASA's HEDS-UP Program

    NASA Astrophysics Data System (ADS)

    Kuznetz, Lawrence

    1998-01-01

    Missions to Mars have been a topic for study since the advent of the space age. But funding has been largely reserved for the unmanned probes such as Viking, Pathfinder and Global Surveyer. Financial and political constraints have relegated human missions, on the other hand, to backroom efforts such as the Space Exploration Initiative (SEI) of 1989-1990. With the new found enthusiasm from Pathfinder and the meteorite ALH84001, however, there is renewed interest in human exploration of Mars. This is manifest in the new Human Exploration and Development of Space (HEDS) program that NASA has recently initiated. This program, through its University Projects (HEDS-UP) office has taken the unusual step of soliciting creative solutions from universities. For its part in the HEDS-UP program, the University of California at Berkeley was asked to study the issues of Habitat design, Space Suits for Mars, Environmental Control and Life Support Systems, Countermeasures to Hypogravity and Crew Size/Mix. These topics were investigated as design projects in "Mars by 2012", an on-going class for undergraduates and graduate students. The methodology of study was deemed to be as important as the design projects themselves and for that we were asked to create an Interactive Design Environment. The Interactive Design Environment (IDE) is an electronic "office" that allows scientists and engineers, as well as other interested parties, to interact with and critique engineering designs as they progress. It usually takes the form of a website that creates a "virtual office" environment. That environment is a place where NASA and others can interact with and critique the university designs for potential inclusion in the Mars Design Reference Mission.

  19. End-To-END Performance of the Future MOMA Instrument Aboard the ExoMars Mission

    NASA Astrophysics Data System (ADS)

    Pinnick, V. T.; Buch, A.; Szopa, C.; Grand, N.; Danell, R.; Grubisic, A.; van Amerom, F. H. W.; Glavin, D. P.; Freissinet, C.; Coll, P. J.; Stalport, F.; Humeau, O.; Arevalo, R. D., Jr.; Brinckerhoff, W. B.; Steininger, H.; Goesmann, F.; Raulin, F.; Mahaffy, P. R.

    2015-12-01

    Following the SAM experiment aboard the Curiosity rover, the Mars Organic Molecule Analyzer (MOMA) experiment aboard the 2018 ExoMars mission will be the continuation of the search for organic matter on the Mars surface. One advancement with the ExoMars mission is that the sample will be extracted as deep as 2 meters below the Martian surface to minimize effects of radiation and oxidation on organic materials. To analyze the wide range of organic composition (volatile and non-volatile compounds) of the Martian soil, MOMA is equipped with a dual ion source ion trap mass spectrometer utilizing UV laser desorption / ionization (LDI) and pyrolysis gas chromatography (pyr-GC). In order to analyze refractory organic compounds and chiral molecules during GC-ITMS analysis, samples may be submitted to a derivatization process, consisting of the reaction of the sample components with specific reactants (MTBSTFA [1], DMF-DMA [2] or TMAH [3]). Previous experimental reports have focused on coupling campaigns between the breadboard versions of the GC, provided by the French team (LISA, LATMOS, CentraleSupelec), and the MS, provided by the US team (NASA-GSFC). This work focuses on the performance verification and optimization of the GC-ITMS experiment using the Engineering Test Unit (ETU) models which are representative of the form, fit and function of the flight instrument including a flight-like pyrolysis oven and tapping station providing by the German team (MPS). The results obtained demonstrate the current status of the end-to-end performance of the gas chromatography-mass spectrometry mode of operation. References: [1] Buch, A. et al. (2009) J Chrom. A, 43, 143-151. [2] Freissinet et al. (2011) J Chrom A, 1306, 59-71. [3] Geffroy-Rodier, C. et al. (2009) JAAP, 85, 454-459.

  20. Nuclear thermal rocket workshop reference system Rover/NERVA

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.

    1991-01-01

    The Rover/NERVA engine system is to be used as a reference, against which each of the other concepts presented in the workshop will be compared. The following topics are reviewed: the operational characteristics of the nuclear thermal rocket (NTR); the accomplishments of the Rover/NERVA programs; and performance characteristics of the NERVA-type systems for both Mars and lunar mission applications. Also, the issues of ground testing, NTR safety, NASA's nuclear propulsion project plans, and NTR development cost estimates are briefly discussed.

  1. Mars Hybrid Propulsion System Trajectory Analysis. Part II; Cargo Missions

    NASA Technical Reports Server (NTRS)

    Chai, Patrick R.; Merrill, Raymond G.; Qu, Min

    2015-01-01

    NASA's Human Spaceflight Architecture Team is developing a reusable hybrid transportation architecture in which both chemical and electric propulsion systems are used to send crew and cargo to Mars destinations such as Phobos, Deimos, the surface of Mars, and other orbits around Mars. By combining chemical and electrical propulsion into a single spaceship and applying each where it is more effective, the hybrid architecture enables a series of Mars trajectories that are more fuel-efficient than an all chemical architecture without significant increases in flight times. This paper shows the feasibility of the hybrid transportation architecture to pre-deploy cargo to Mars and Phobos in support of the Evolvable Mars Campaign crew missions. The analysis shows that the hybrid propulsion stage is able to deliver all of the current manifested payload to Phobos and Mars through the first three crew missions. The conjunction class trajectory also allows the hybrid propulsion stage to return to Earth in a timely fashion so it can be reused for additional cargo deployment. The 1,100 days total trip time allows the hybrid propulsion stage to deliver cargo to Mars every other Earth-Mars transit opportunity. For the first two Mars surface mission in the Evolvable Mars Campaign, the short trip time allows the hybrid propulsion stage to be reused for three round-trip journeys to Mars, which matches the hybrid propulsion stage's designed lifetime for three round-trip crew missions to the Martian sphere of influence.

  2. Mars Navigator: An Interactive Multimedia Program about Mars, Aerospace Engineering, Astronomy, and the JPL Mars Missions. [CD-ROM

    ERIC Educational Resources Information Center

    Gramoll, Kurt

    This CD-ROM introduces basic astronomy and aerospace engineering by examining the Jet Propulsion Laboratory's (JPL) Mars Pathfinder and Mars Global Surveyor missions to Mars. It contains numerous animations and narrations in addition to detailed graphics and text. Six interactive laboratories are included to help understand topics such as the…

  3. Robotic astrobiology - the need for sub-surface penetration of Mars

    NASA Astrophysics Data System (ADS)

    Ellery, A.; Ball, A.; Cockell, C.; Coste, P.; Dickensheets, D.; Edwards, H.; Hu, H.; Kolb, C.; Lammer, H.; Lorenz, R.; McKee, G.; Richter, L.; Winfield, A.; Welch, C.

    2002-11-01

    Recent interest in the astrobiological investigation of Mars has culminated in the only planned astrobiology-focussed robotic mission to Mars - the Beagle2 mission to be carried to Mars by the Mars Express spacecraft in 2003. Beagle2 will be primarily investigating the surface and near-surface environment of Mars. However, the results from the Viking Mars lander indicated that the Martian surface is saturated in peroxides and super-oxides which would rapidly degrade any organic material. Furthermore, recent models of gardening due to meteoritic impacts on the Martian surface suggest that the depth of this oxidising layer could extend to depths of 2-3m. Given that the discovery of organic fossilised residues will be the primary target for astrobiological investigation, this implies that future robotic astrobiology missions to Mars must penetrate to below these depths. The need to penetrate into the sub-surface of Mars has recently been given greater urgency with the discovery of extensive water ice-fields as little as 1m from the surface. We review the different technologies that make this penetration into the sub-surface a practical possibility on robotic missions. We further briefly present one such implementation of these technologies through the use of ground-penetrating moles - The Vanguard Mars mission proposal.

  4. Mars Polar Lander Mission Distributed Operations

    NASA Technical Reports Server (NTRS)

    Norris, J.; Backes, P.; Slostad, J.; Bonitz, R.; Tharp, G.; Tso, K.

    2000-01-01

    The Mars Polar Lander (MPL) mission is the first planetary mission to use Internet-based distributed ground operations where scientists and engineers collaborate in daily mission operations from multiple geographically distributed locations via the Internet.

  5. The Long, Bumpy Road to a Mars Aeronomy Mission (Invited)

    NASA Astrophysics Data System (ADS)

    Grebowsky, J. M.; Luhmann, J. G.; Bougher, S. W.; Jakosky, B. M.

    2013-12-01

    With the advent of the space age, early focus was put into characterizing the Earth's upper atmosphere with aeronomy missions. These missions were designed to study the upper atmosphere region of a planet where the ionosphere is produced with particular attention given to the composition, properties and motion of atmosphere constituents. In particular a very successful US series of Atmosphere Explorer aeronomy spacecraft (1963-1977) was implemented. This upper atmosphere region is the envelope that all energy from the sun must penetrate and is recognized as an inseparable part of a planet's entire atmosphere. Venus was the next planet to have its upper atmosphere/ionosphere deeply probed via the Pioneer Venus Orbiter (1978-1986) that carried a complement of instruments similar to some flown on the Atmosphere Explorers. The planet which humans have long set their imagination on, Mars, has yet to be subjected to the same detailed upper atmosphere perusal until now, with MAVEN. Not that attempts have been wanting. More than 30 spacecraft launches to Mars were attempted, but half were not successful and those that attained orbit came far short of attaining the same level of knowledge of the Martian upper atmosphere. Other countries had planned Mars aeronomy missions that didn't bear fruit - e.g. Mars-96 and Nozomi and the US did studies for two missions, Mars Aeronomy Orbiter and MUADEE, that never were implemented. This is about to change. NASA's Scout Program singled out two aeronomy missions in its final competition and the selected mission, MAVEN, will fly with the needed sophistication of instruments to finally probe and understand the top of Mars' atmosphere. Was this late selection of a NASA aeronomy mission to Mars a philosophy change in US priorities or was it an accident of planning and budget constraints? Was it driven by the developing knowledge that Mars really had an early atmosphere environment conducive to life and that an aeronomy mission is indeed needed to determine where and how fast the life-capable atmosphere disappeared. Or was it thought that other orbiting missions like MEx or MGS that sampled the ionosphere were inadequate to the task? In a way the delay in executing a Mars aeronomy mission has a positive side; i.e. instruments are better developed than in earlier proposals and we have the benefit of MEx and MGS better defining the science objectives for an aeronomy mission. The bumps and potholes that planners of missions to Mars encountered makes an interesting story

  6. Mechanically-Deployed Hypersonic Decelerator and Conformal Ablator Technologies for Mars Missions

    NASA Technical Reports Server (NTRS)

    Venkatapathy, Ethiraj; Wercinski, Paul F.; Beck, Robin A. S.; Hamm, Kenneth R.; Yount, Bryan C.; Makino, A.; Smith, B.; Gage, P.; Prabhu, D.

    2012-01-01

    The concept of a mechanically deployable hypersonic decelerator, developed initially for high mass (40 MT) human Mars missions, is currently funded by OCT for technology maturation. The ADEPT (Adaptive, Deployable Entry and Placement Technology) project has broad, game-changing applicability to in situ science missions to Venus, Mars, and the Outer Planets. Combined with maturation of conformal ablator technology (another current OCT investment), the two technologies provide unique low mass mission enabling capabilities otherwise not achievable by current rigid aeroshell or by inflatables. If this abstract is accepted, we will present results that illustrate the mission enabling capabilities of the mechanically deployable architecture for: (1) robotic Mars (Discovery or New Frontiers class) in the near term; (2) alternate approaches to landing MSL-class payloads, without the need for supersonic parachute or lifting entry, in the mid-term; and (3) Heavy mass and human missions to Mars in the long term.

  7. Mechanically-Deployed Hypersonic Decelerator and Conformal Ablator Technologies for Mars Missions

    NASA Technical Reports Server (NTRS)

    Venkatapathy, E.; Wercinski, P.; Prabhu, D.

    2012-01-01

    The concept of a mechanically deployable hypersonic decelerator, developed initially for high mass (approximately 40 MT) human Mars missions, is currently funded by OCT for technology maturation. The ADEPT (Adaptive, Deployable Entry and Placement Technology) project has broad, game-changing applicability to in situ science missions to Venus, Mars, and the Outer Planets. Combined with maturation of conformal ablator technology (another current OCT investment), the two technologies provide unique low-mass mission enabling capabilities otherwise not achievable by current rigid aeroshell or by inflatables. If this abstract is accepted, we will present results that illustrate the mission enabling capabilities of the mechanically deployable architecture for: (1) robotic Mars (Discovery or New Frontiers class) in the near term (2) alternate approaches to landing MSL-class payloads, without the need for supersonic parachute or lifting entry, in the mid-term and (3) Heavy mass and human missions to Mars in the long term.

  8. Development of a NASA 2018 Mars Landed Mission Concept

    NASA Technical Reports Server (NTRS)

    Wilson, M. G.; Salvo, C. G.; Abilleira, F.; Sengstacken, A. J.; Allwood, A. G.; Backes, P. G.; Lindemann, R. A.; Jordan, J. F.

    2010-01-01

    Fundamental to NASA's Mars Exploration Program (MEP) is an ongoing development of an integrated and coordinated set of possible future candidate missions that meet fundamental science and programmatic objectives of NASA and the Mars scientific community. In the current planning horizon of the NASA MEP, a landed mobile surface exploration mission launching in the 2018 Mars launch opportunity exists as a candidate project to meet MEP in situ science and exploration objectives. This paper describes the proposed mission science objectives and the mission implementation concept developed for the 2018 opportunity. As currently envisioned, this mission concept seeks to explore a yet-to-be-selected site with high preservation potential for physical and chemical biosignatures, evaluate paleoenvironmental conditions, characterize the potential for preservation of biosignatures, and access multiple sequences of geological units in a search for evidence of past life and/or prebiotic chemistry at a site on Mars.

  9. Mars: A reassessment of its interest to biology

    NASA Technical Reports Server (NTRS)

    Mckay, Christopher P.

    1992-01-01

    Of all the planets in the solar system, Mars is certainly the one that has inspired the most speculation concerning extraterrestrial life. Observers had long ago noticed that Mars exhibits changes in its polar caps and alterations in its surface coloration that parallel seasonal changes on Earth. The fascination with Mars and the possibility of life on Mars continued into the spacecraft era and was directly expressed in the Viking Missions. These highly successful missions had the search for life on Mars as one of their principal goals. A review of Viking Missions experiments is presented. Results of these investigations are summarized. While the Viking Missions returned a negative answer to the question of life on Mars, they also showed that many years ago Mars was a very different place and enjoyed conditions that may have been conducive to the origin of life - life that may have long since become extinct. Evidence for the existence of water on Mars in the past is presented. Techniques used to study early life on Earth, which may also be used for similar studies on Mars, are described.

  10. Solar Electric Propulsion Technology Development for Electric Propulsion

    NASA Technical Reports Server (NTRS)

    Mercer, Carolyn R.; Kerslake, Thomas W.; Scheidegger, Robert J.; Woodworth, Andrew A.; Lauenstein, Jean-Marie

    2015-01-01

    NASA is developing technologies to prepare for human exploration missions to Mars. Solar electric propulsion (SEP) systems are expected to enable a new cost effective means to deliver cargo to the Mars surface. Nearer term missions to Mars moons or near-Earth asteroids can be used to both develop and demonstrate the needed technology for these future Mars missions while demonstrating new capabilities in their own right. This presentation discusses recent technology development accomplishments for high power, high voltage solar arrays and power management that enable a new class of SEP missions.

  11. Interplanetary mission design handbook. Volume 1, part 2: Earth to Mars ballistic mission opportunities, 1990-2005

    NASA Technical Reports Server (NTRS)

    Sergeyevsky, A. B.; Snyder, G. C.; Cunniff, R. A.

    1983-01-01

    Graphical data necessary for the preliminary design of ballistic missions to Mars are provided. Contours of launch energy requirements, as well as many other launch and Mars arrival parameters, are presented in launch date/arrival date space for all launch opportunities from 1990 through 2005. In addition, an extensive text is included which explains mission design methods, from launch window development to Mars probe and orbiter arrival design, utilizing the graphical data as well as numerous equations relating various parameters.

  12. Long Range Navigation for Mars Rovers Using Sensor-Based Path Planning and Visual Localisation

    NASA Technical Reports Server (NTRS)

    Laubach, Sharon L.; Olson, Clark F.; Burdick, Joel W.; Hayati, Samad

    1999-01-01

    The Mars Pathfinder mission illustrated the benefits of including a mobile robotic explorer on a planetary mission. However, for future Mars rover missions, significantly increased autonomy in navigation is required in order to meet demanding mission criteria. To address these requirements, we have developed new path planning and localisation capabilities that allow a rover to navigate robustly to a distant landmark. These algorithms have been implemented on the JPL Rocky 7 prototype microrover and have been tested extensively in the JPL MarsYard, as well as in natural terrain.

  13. Martian settlement

    NASA Technical Reports Server (NTRS)

    Roberts, Barney B.

    1987-01-01

    The rationale for a manned Mars mission and the establishment of a base is divided into three areas: science, resource utilization, and strategic issues. The effects of a Mars mission on the objectives of near-term NASA programs, and the applications of these programs to a Mars mission are examined. The use of extraterrestrial resources to supply space settlements and thereby reduce transportation costs is studied; the development of systems for extraterrestrial materials processing will need to be researched. The possibility of a joint U.S./Soviet Mars mission is discussed by the symposium participants.

  14. Effect of Earth and Mars departure delays on human missions to Mars

    NASA Technical Reports Server (NTRS)

    Desai, Prasun N.; Tartabini, Paul V.

    1993-01-01

    This study determines the impact on the initial mass in low-Earth orbit (IMLEO) for delaying departure from Mars and Earth by 5, 15, and 30 days, once a nominal mission to Mars has been selected. Additionally, the use of a deep space maneuver (DSM) is attempted to alleviate the IMLEO penalties. Three different classes of missions are analyzed using chemical and nuclear thermal propulsion systems in the 2000-2025 time-frame: opposition, conjunction, and fast-transfer conjunction. The results indicate that Mars and Earth delays can lead to large IMLEO penalties. Opposition and fast-transfer conjunction class missions have the highest IMLEO penalties, upwards of 432.4 mt and 1977.3 mt, respectively. Conjunction class missions, on the other hand, tend to be insensitive to Mars and Earth delays having IMLEO penalties under 103.5 mt. As expected, nuclear thermal propulsion had significantly lower IMLEO penalties as compared to chemical propulsion. The use of a DSM is found not to have a significant impact on reducing the IMLEO penalties. Through this investigation, the effect of off-nominal departure conditions on the overall mission (i.e., IMLEO) can be gained, enabling mission designers to incorporate the influence of off-nominal departure conditions of the interplanetary trajectory in the overall conceptual design process of a Mars transfer vehicle.

  15. Manned Mars Missions. Working group papers, volume 1, section 1-4

    NASA Technical Reports Server (NTRS)

    Duke, Michael B. (Editor); Keaton, Paul W. (Editor)

    1986-01-01

    The papers presented by the working group on Manned Mars Missions are given. The purpose is to update earlier Mars missions study data, to examine the impact of new and emerging technologies on Mars mission capabilities, and to identify technological issues that would be useful in projecting scientific and engineering research in the coming decades. The papers are grouped into nine sections, which are: (1) rationale; (2) transportation trades and issues; (3) mission and configuration concepts; (4) surface infrastructure; (5) science investigations and issues; (6) life science/medical issues; (7) subsystems and technology development requirements; (8) political and economic issues; and (9) impact on other programs.

  16. Multimegawatt electric propulsion system design considerations

    NASA Technical Reports Server (NTRS)

    Gilland, J. H.; Myers, Roger M.; Patterson, Michael J.

    1991-01-01

    Piloted Mars Mission Requirements of relatively short trip times and low initial mass in Earth orbit as identified by the NASA Space Exploration Initiative, indicate the need for multimegawatt electric propulsion systems. The design considerations and results for two thruster types, the argon ion, and hydrogen magnetoplasmadynamic thrusters, are addressed in terms of configuration, performance, and mass projections. Preliminary estimates of power management and distribution for these systems are given. Some assessment of these systems' performance in a reference Space Exploration Initiative piloted mission are discussed. Research and development requirements of these systems are also described.

  17. A fundamental parameters approach to calibration of the Mars Exploration Rover Alpha Particle X-ray Spectrometer

    NASA Astrophysics Data System (ADS)

    Campbell, J. L.; Lee, M.; Jones, B. N.; Andrushenko, S. M.; Holmes, N. G.; Maxwell, J. A.; Taylor, S. M.

    2009-04-01

    The detection sensitivities of the Alpha Particle X-ray Spectrometer (APXS) instruments on the Mars Exploration Rovers for a wide range of elements were experimentally determined in 2002 using spectra of geochemical reference materials. A flight spare instrument was similarly calibrated, and the calibration exercise was then continued for this unit with an extended set of geochemical reference materials together with pure elements and simple chemical compounds. The flight spare instrument data are examined in detail here using a newly developed fundamental parameters approach which takes precise account of all the physics inherent in the two X-ray generation techniques involved, namely, X-ray fluorescence and particle-induced X-ray emission. The objectives are to characterize the instrument as fully as possible, to test this new approach, and to determine the accuracy of calibration for major, minor, and trace elements. For some of the lightest elements the resulting calibration exhibits a dependence upon the mineral assemblage of the geological reference material; explanations are suggested for these observations. The results will assist in designing the overall calibration approach for the APXS on the Mars Science Laboratory mission.

  18. Analysis of Moessbauer Data from Mars: A Database and Artificial Neural Network for Identification of Iron-bearing Phases

    NASA Technical Reports Server (NTRS)

    Morris, R. V.; deSouza, P. A.; Morris, R. V.; Klingelhoefer, G.

    2003-01-01

    The exploration of the planet Mars is one of the major goals within the Solar system exploration programs of the US-American space agency NASA and the European Space Agency ESA. In particular the search for water and life and understanding of the history of the surface and atmosphere will be the major tasks of the upcoming space missions to Mars. The miniaturized Moessbauer spectrometer MIMOS II has been selected for the NASA Mars-Exploration-Rover twin-mission to Mars in 2003 and the ESA 2003 Mars-Express Beagle 2 mission. Reduced in size and weight, in comparison to ordinary laboratory setup, the sensor head just weights approximately 400 g, with a volume of (50x50x90) cu mm, and holds two gamma-ray sources: the stronger for experiments and the weaker for calibrations. The collimator (in sample direction) also shields the primary radiation off the detectors. Around the drive four detectors are mounted. The detectors are made of Si-PIN-photodiodes in chip form (100 sq mm, thickness of 0.5 mm). The control unit is located in a separate electronics board. This board is responsible for the power supply, generation of the drive's velocity reference signal, read of the detector pulses to record the spectrum, data storage and communication with the host computer. After more than four decades from the discovery of the Moessbauer effect, more than 400 minerals were studied at different temperatures. Their Moessbauer parameters were reported in the literature, and have been recently collected in a data bank. Previous Mars-missions, namely Viking and Mars Pathfinder, revealed Si, Al, Fe, Mg, Ca, K, Ti, S and Cl to be the major constituents in soil and rock elemental composition of the red planet. More than 200 minerals already studied by Moessbauer spectroscopy contain significant amounts of these elements. A considerable number of Moessbauer studies were also carried out on meteorites and on Moon samples. Looking backward in the studies of the whole Moessbauer community, we have built a specific library containing Moessbauer parameters of those possible Mars minerals. The selected minerals, their Moessbauer parameter values (min. max. s.d and number of available data), main site substitution, behavior as a function of temperature and a ranking as expected to be found on Mars were organized. Mars-analogue Fe-bearing minerals not studied by Moessbauer spectroscopy are being collected and investigated. In addition, it an identification system based on Artificial Neural Networks (ANN) was implemented which enables fast and precise mineral identification from the experimental Moessbauer parameters at a given temperature.

  19. Mars Atmospheric Characterization Using Advanced 2-Micron Orbiting Lidar

    NASA Technical Reports Server (NTRS)

    Singh, U.; Engelund, W.; Refaat, T.; Kavaya, M.; Yu, J.; Petros, M.

    2015-01-01

    Mars atmospheric characterization is critical for exploring the planet. Future Mars missions require landing massive payloads to the surface with high accuracy. The accuracy of entry, descent and landing (EDL) of a payload is a major technical challenge for future Mars missions. Mars EDL depends on atmospheric conditions such as density, wind and dust as well as surface topography. A Mars orbiting 2-micron lidar system is presented in this paper. This advanced lidar is capable of measuring atmospheric pressure and temperature profiles using the most abundant atmospheric carbon dioxide (CO2) on Mars. In addition Martian winds and surface altimetry can be mapped, independent of background radiation or geographical location. This orbiting lidar is a valuable tool for developing EDL models for future Mars missions.

  20. Report on the Loss of the Mars Polar Lander and Deep Space 2 Missions

    NASA Technical Reports Server (NTRS)

    Albee, Arden; Battel, Steven; Brace, Richard; Burdick, Garry; Casani, John; Lavell, Jeffrey; Leising, Charles; MacPherson, Duncan; Burr, Peter; Dipprey, Duane

    2000-01-01

    NASA's Mars Surveyor Program (MSP) began in 1994 with plans to send spacecraft to Mars every 26 months. Mars Global Surveyor (MGS), a global mapping mission, was launched in 1996 and is currently orbiting Mars. Mars Surveyor '98 consisted of Mars Climate Orbiter (MCO) and Mars Polar Lander (MPL). Lockheed Martin Astronautics (LMA) was the prime contractor for Mars Surveyor '98. The Jet Propulsion Laboratory (JPL), California Institute of Technology, manages the Mars Surveyor Program for NASA's Office of Space Science. MPL was developed under very tight funding constraints. The combined development cost of MPL and MCO, including the cost of the two launch vehicles, was approximately the same as the development cost of the Mars Pathfinder mission, including the cost of its single launch vehicle. The MPL project accepted the challenge to develop effective implementation methodologies consistent with programmatic requirements.

  1. Lunar and Planetary Science XXXV: Missions and Instruments: Hopes and Hope Fulfilled

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The titles in this section include: 1) Mars Global Surveyor Mars Orbiter Camera in the Extended Mission: The MOC Toolkit; 2) Mars Odyssey THEMIS-VIS Calibration; 3) Early Science Operations and Results from the ESA Mars Express Mission: Focus on Imaging and Spectral Mapping; 4) The Mars Express/NASA Project at JPL; 5) Beagle 2: Mission to Mars - Current Status; 6) The Beagle 2 Microscope; 7) Mars Environmental Chamber for Dynamic Dust Deposition and Statics Analysis; 8) Locating Targets for CRISM Based on Surface Morphology and Interpretation of THEMIS Data; 9) The Phoenix Mission to Mars; 10) First Studies of Possible Landing Sites for the Phoenix Mars Scout Mission Using the BMST; 11) The 2009 Mars Telecommunications Orbiter; 12) The Aurora Exploration Program - The ExoMars Mission; 13) Electron-induced Luminescence and X-Ray Spectrometer (ELXS) System Development; 14) Remote-Raman and Micro-Raman Studies of Solid CO2, CH4, Gas Hydrates and Ice; 15) The Compact Microimaging Spectrometer (CMIS): A New Tool for In-Situ Planetary Science; 16) Preliminary Results of a New Type of Surface Property Measurement Ideal for a Future Mars Rover Mission; 17) Electrodynamic Dust Shield for Solar Panels on Mars; 18) Sensor Web for Spatio-Temporal Monitoring of a Hydrological Environment; 19) Field Testing of an In-Situ Neutron Spectrometer for Planetary Exploration: First Results; 20) A Miniature Solid-State Spectrometer for Space Applications - Field Tests; 21) Application of Laser Induced Breakdown Spectroscopy (LIBS) to Mars Polar Exploration: LIBS Analysis of Water Ice and Water Ice/Soil Mixtures; 22) LIBS Analysis of Geological Samples at Low Pressures: Application to Mars, the Moon, and Asteroids; 23) In-Situ 1-D and 2-D Mapping of Soil Core and Rock Samples Using the LIBS Long Spark; 24) Rocks Analysis at Stand Off Distance by LIBS in Martian Conditions; 25) Evaluation of a Compact Spectrograph/Detection System for a LIBS Instrument for In-Situ and Stand-Off Detection; 26) Analysis of Organic Compounds in Mars Analog Samples; 27) Report of the Organic Contamination Science Steering Group; 28) The Water-Wheel IR (WIR) - A Contact Survey Experiment for Water and Carbonates on Mars; 29) Mid-IR Fiber Optic Probe for In Situ Water Detection and Characterization; 30) Effects of Subsurface Sampling & Processing on Martian Simulant Containing Varying Quantities of Water; 31) The Subsurface Ice Probe (SIPR): A Low-Power Thermal Probe for the Martian Polar Layered Deposits; 32) Deploying Ground Penetrating Radar in Planetary Analog Sites to Evaluate Potential Instrument Capabilities on Future Mars Missions; 33) Evaluation of Rock Powdering Methods to Obtain Fine-grained Samples for CHEMIN, a Combined XRD/XRF Instrument; 34) Novel Sample-handling Approach for XRD Analysis with Minimal Sample Preparation; 35) A New Celestial Navigation Method for Mars Landers; 36) Mars Mineral Spectroscopy Web Site: A Resource for Remote Planetary Spectroscopy.

  2. Exploring Mars

    NASA Astrophysics Data System (ADS)

    Breuil, Stéphanie

    2016-04-01

    Mars is our neighbour planet and has always fascinated humans as it has been seen as a potential abode for life. Knowledge about Mars is huge and was constructed step by step through numerous missions. It could be difficult to describe these missions, the associated technology, the results, the questions they raise, that's why an activity is proposed, that directly interests students. Their production is presented in the poster. Step 1: The main Mars feature and the first Mars explorations using telescope are presented to students. It should be really interesting to present "Mars Canals" from Percival Lowell as it should also warn students against flawed interpretation. Moreover, this study has raised the big question about extra-terrestrial life on Mars for the first time. Using Google Mars is then a good way to show the huge knowledge we have on the planet and to introduce modern missions. Step 2: Students have to choose and describe one of the Mars mission from ESA and NASA. They should work in pairs. Web sites from ESA and NASA are available and the teacher makes sure the main missions will be studied. Step 3: Students have to collect different pieces of information about the mission - When? Which technology? What were the main results? What type of questions does it raise? They prepare an oral presentation in the form they want (role play, academic presentation, using a poster, PowerPoint). They also have to produce playing cards about the mission that could be put on a timeline. Step 4: As a conclusion, the different cards concerning different missions are mixed. Groups of students receive cards and they have to put them on a timeline as fast as possible. It is also possible to play the game "timeline".

  3. A Mars Rover Mission Simulation on Kilauea Volcano

    NASA Technical Reports Server (NTRS)

    Stoker, Carol; Cuzzi, Jeffery N. (Technical Monitor)

    1995-01-01

    A field experiment to simulate a rover mission on Mars was performed using the Russian Marsokhod rover deployed on Kilauea Volcano HI in February, 1995. A Russian Marsokhod rover chassis was equipped with American avionics equipment, stereo cameras on a pan and tilt platform, a digital high resolution body-mounted camera, and a manipulator arm on which was mounted a camera with a close-up lens. The six wheeled rover is 2 meters long and has a mass of 120 kg. The imaging system was designed to simulate that used on the planned "Mars Together" mission. The rover was deployed on Kilauea Volcano HI and operated from NASA Ames by a team of planetary geologists and exobiologists. Two modes of mission operations were simulated for three days each: (1) long time delay, low data bandwidth (simulating a Mars mission), and (2) live video, wide-bandwidth data (allowing active control simulating a Lunar rover mission or a Mars rover mission controlled from on or near the Martian surface). Simulated descent images (aerial photographs) were used to plan traverses to address a detailed set of science questions. The actual route taken was determined by the science team and the traverse path was frequently changed in response to the data acquired and to unforeseen operational issues. Traverses were thereby optimized to efficiently answer scientific questions. During the Mars simulation, the rover traversed a distance of 800 m. Based on the time delay between Earth and Mars, we estimate that the same operation would have taken 30 days to perform on Mars. This paper will describe the mission simulation and make recommendations about incorporating rovers into the Mars surveyor program.

  4. Optimization of vehicle weight for Mars excursion missions

    NASA Technical Reports Server (NTRS)

    Ferebee, Melvin J., Jr.

    1991-01-01

    The excursion class mission to Mars is defined as a mission with one year durations coupled with a stay time of up to 30 days. The fuel budget for such a mission is investigated. The overall figure of merit in such an assessment is the vehicle weight ratio, the ratio between the wet vehicle weight to the dry vehicle weight. It is necessary to minimize the overall fuel budget for the mission in order to maximize the benefits that could be obtained by sending humans to Mars. Assumptions used in the analysis are: each mission will depart and terminate in low-earth-orbit (LEO) (500 km circular) and the maximum stay time at Mars is 30 days. The maximum mission duration is one year (355-375 days). The mass returned to LEO is 135,000 kg, the dropoff mass left at Mars is 168,000 kg. Three propulsive techniques for atmospheric interface are investigated: aerobraking, all-chemical propulsion, and nuclear thermal propulsion. By defining the fuel requirements, the space transfer vehicle's configuration is defined.

  5. Gram-negative Biomass in Clay Minerals Analogs: Testing Habitability Potential for the 2011 Mars Science Laboratory Mission

    NASA Astrophysics Data System (ADS)

    Bonaccorsi, R.; McKay, C. P.

    2009-12-01

    Landing sites of next missions to Mars i.e., the US 2011 Mars Science Laboratory (MSL11) and the ESA2016 Pasteur ExoMars, will include phyllosilicate outcrops as targets for investigating the geological and biological history of that planet. In this context, we present a study assessing the living biomass and habitability potential in mineralogical Mars analogs such as phyllosilicates and hematite-rich deposits encompassing a broad arid-hyper-arid climate range (annual rainfall <0.2 to ~700mm/y). Samples from the Atacama Desert (Chile), the Death Valley (CA), and the California Coast (USA) were analyzed for microbial lipopolysaccharide (LPS) as proxy for Gram-negatives biomass with the Limulus-Amebocite-Lysate (LAL) assay. Mineral phases were identified using X-Ray-Diffraction (XRD). These samples resulted to contain phyllosilicate phases similar to those identified, or inferred [1], on the surface of Mars by the OMEGA-Mars/Express [e.g., 2], the Mars Reconnaissance Orbiter (MRO) instruments (HiRISE and CRISM) [3]. Basic observations were: 1) there is no systematic pattern in biomass content of clays vs. non-clays (oxidized) materials from the study sites; 2) Atacama desiccation polygons (muscovite and kaolinite) and contiguous hematite-rich hyper-arid deposits contain the lowest biomass, i.e., ~104to-105 cells/g, respectively; 3) the hyper-arid clays contain three-order magnitude lower Gram-negative biomass than those (montmorillonite, illite, and chlorite) from the arid Death Valley site (~107cells/g); and 4) finally, the Gram-negative (~107cells/g) of clay minerals-rich materials from the arid site is about the same than that (~1.5 to ~3.0 x 107cells/g) of water-saturated massive deposits (kaolinite, illite, and vermiculite) from the wetter California coast. Results from this investigation will help testing for the habitability potential of phyllosilicate deposits sampled by the MSL11 Mission. REFERENCES:[1] Bibring et al., 2006, Science 312:400-404; [2] Wang et al., 2006 JGR E02S16 Vol.111; [3] Bishop et al., 2008. Science, 321,830-833.

  6. Affordable Exploration of Mars: Recommendations from a Community Workshop on Sustainable Initial Human Missions

    NASA Technical Reports Server (NTRS)

    Thronson, Harley; Carberry, Chris; Cassady, R. J.; Cooke, Doug; Hopkins, Joshua; Perino, Maria A.; Kirkpatrick, Jim; Raftery, Michael; Westenberg, Artemis; Zucker, Richard

    2013-01-01

    There is a growing consensus that within two decades initial human missions to Mars are affordable under plausible budget assumptions and with sustained international participation. In response to this idea, a distinguished group of experts from the Mars exploration stakeholder communities attended the "Affording Mars" workshop at George Washington University in December, 2013. Participants reviewed and discussed scenarios for affordable and sustainable human and robotic exploration of Mars, the role of the International Space Station over the coming decade as the essential early step toward humans to Mars, possible "bridge" missions in the 2020s, key capabilities required for affordable initial missions, international partnerships, and a usable definition of affordability and sustainability. We report here the findings, observations, and recommendations that were agreed to at that workshop.

  7. Europe is going to Mars

    NASA Astrophysics Data System (ADS)

    1999-06-01

    The Agency's Science Programme Committee (SPC) approved Mars Express after ESA's Council, meeting at ministerial level in Brussels on 11 and 12 May, had agreed the level of the science budget for the next 4 years, just enough to make the mission affordable. "Mars Express is a mission of opportunity and we felt we just had to jump in and do it. We are convinced it will produce first-rate science", says Hans Balsiger, SPC chairman. As well as being a first for Europe in Mars exploration, Mars Express will pioneer new, cheaper ways of doing space science missions. "With a total cost of just 150 million euros, Mars Express will be the cheapest Mars mission ever undertaken", says Roger Bonnet, ESA's Director of Science. Mars Express will be launched in June 2003. When it arrives at the red planet six months later, it will begin to search for water and life. Seven instruments, provided by space research institutes throughout Europe, will make observations from the main spacecraft as it orbits the planet. Just before the spacecraft arrives, it will release a small lander, provided by research institutes in the UK, that will journey on to the surface to look for signs of life. The lander is called Beagle 2 after the ship in which Charles Darwin sailed round the world in search of evidence supporting his theory of evolution. But just as Darwin had to raise the money for his trip, so the search is on for public and private finance for Beagle 2. "Beagle 2 is an extremely important element of the mission", says Bonnet. Europe's space scientists have envisaged a mission to Mars for over fifteen years. But limited funding has prevented previous proposals from going ahead. The positioning of the planets in 2003, however, offers a particularly favourable passage to the red planet - an opportunity not to be missed. Mars Express will be joined by an international flotilla of spacecraft that will also be using this opportunity to work together on scientific questions and pave the way for future exploration. ESA is now able to afford Mars Express because it will be built more quickly and cheaply than any other comparable mission. It will be the first of the Agency's new flexible missions, based on maximum reuse of technology off-the-shelf and from other missions (the Rosetta cometary mission in this case). Mars Express will explore the extent to which innovative working practices, now made possible by the maturity of Europe's space industry, can cut mission costs and the time from concept to launch : a new kind of relationship with industrial partners is starting. "We are adopting a new approach to management by delegating to Matra Marconi Space (the prime contractor) responsibility for the whole project. This means we can reduce the ESA's management costs" says Bonnet. Despite the knock-down price, however, the future of Mars Express has hung in the balance because of the steady erosion of ESA's space science budget since 1995. Last November, the SPC said the mission could go ahead only if it could be afforded without affecting missions already approved, especially the FIRST infra-red observatory and the Planck mission to measure the cosmic microwave background. On 19/20 May, the SPC, which has the ultimate decision over the Agency's science missions, agreed that the level of resources allowed was just sufficient to allow Mars Express to go ahead. "To do such an ambitious mission for so little money is a challenge and we have decided to meet", says Balsiger.

  8. Mars orbiter conceptual systems design study

    NASA Technical Reports Server (NTRS)

    Dixon, W.; Vogl, J.

    1982-01-01

    Spacecraft system and subsystem designs at the conceptual level to perform either of two Mars Orbiter missions, a Climatology Mission and an Aeronomy Mission were developed. The objectives of these missions are to obtain and return data.

  9. Human Mars Surface Mission Nuclear Power Considerations

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle A.

    2018-01-01

    A key decision facing Mars mission designers is how to power a crewed surface field station. Unlike the solar-powered Mars Exploration Rovers (MER) that could retreat to a very low power state during a Martian dust storm, human Mars surface missions are estimated to need at least 15 kilowatts of electrical (kWe) power simply to maintain critical life support and spacecraft functions. 'Hotel' loads alone for a pressurized crew rover approach two kWe; driving requires another five kWe-well beyond what the Curiosity rover’s Radioisotope Power System (RPS) was designed to deliver. Full operation of a four-crew Mars field station is estimated at about 40 kWe. Clearly, a crewed Mars field station will require a substantial and reliable power source, beyond the scale of robotic mission experience. This paper explores the applications for both fission and RPS nuclear options for Mars.

  10. Chemistry and mineralogy of Martian dust: An explorer's primer

    NASA Technical Reports Server (NTRS)

    Gooding, James L.

    1991-01-01

    A summary of chemical and mineralogical properties of Martian surface dust is offered for the benefit of engineers or mission planners who are designing hardware or strategies for Mars surface exploration. For technical details and specialized explanations, references should be made to literature cited. Four sources used for information about Martian dust composition: (1) Experiments performed on the Mars surface by the Viking Landers 1 and 2 and Earth-based lab experiments attempting to duplicate these results; (2) Infrared spectrophotometry remotely performed from Mars orbit, mostly by Mariner 9; (3) Visible and infrared spectrophotometry remotely performed from Earth; and (4) Lab studies of the shergottite nakhlite chassignite (SNC) clan of meteorites, for which compelling evidence suggests origin on Mars. Source 1 is limited to fine grained sediments at the surface whereas 2 and 3 contain mixed information about surface dust (and associated rock) and atmospheric dust. Source 4 has provided surprisingly detailed information but investigations are still incomplete.

  11. Progress-like logistical supply vehicle and the Mars Manned Mission architecture

    NASA Astrophysics Data System (ADS)

    Keith, E. L.

    1993-06-01

    The paper examines the economics of the Russian Progress spacecraft (which has been used to supply Russian space stations with propellant and fresh supplies since 1978), as applied to the American Manned Mars Mission architecture. The results of the examination show that an economic American Progress-like vehicle could be designed significantly different from the Russian spacecraft. The use of a Progress-like vehicle could permit Manned Mars missions without the need for larger heavy-lift vehicles that do not now exist in the American inventory. A MIR-like Manned Mars mission architecture would also enable elimination of most of the extravehicular activity required to assemble a Mars-bound craft.

  12. The Role of the Photogeologic Mapping in the Morocco 2013 Mars Analog Field Simulation (Austrian Space Forum)

    NASA Astrophysics Data System (ADS)

    Losiak, Anna; Orgel, Csilla; Moser, Linda; MacArthur, Jane; Gołębiowska, Izabela; Wittek, Steffen; Boyd, Andrea; Achorner, Isabella; Rampey, Mike; Bartenstein, Thomas; Jones, Natalie; Luger, Ulrich; Sans, Alejandra; Hettrich, Sebastian

    2013-04-01

    The MARS2013 mission: The Austrian Space Forum together with multiple scientific partners will conduct a Mars analog field simulation. The project takes place between 1st and 28th of February 2013 in the northern Sahara near Erfoud. During the simulation a field crew (consisting of suited analog astronauts and a support team) will conduct several experiments while being managed by the Mission Support Center (MSC) located in Innsbruck, Austria. The aim of the project is to advance preparation of the future human Mars missions by testing: 1) the mission design with regard to operational and engineering challenges (e.g., how to work efficiently with introduced time delay in communication between field team and MSC), 2) scientific instruments (e.g., rovers) and 3) human performance in conditions analogous to those that will be encountered on Mars. The Role of Geological Mapping: Remote Science Support team (RSS) is responsible for processing science data obtained in the field. The RSS is also in charge of preparing a set of maps to enable planning activities of the mission (including the development of traverses) [1, 2]. The usage of those maps will increase the time-cost efficiency of the entire mission. The RSS team members do not have any prior knowledge about the area where the simulation is taking place and the analysis is fully based on remote sensing satellite data (Landsat, GoogleEarth) and a digital elevation model (ASTER GDEM)from the orbital data. The maps design: The set of maps (covering area 5 km X 5 km centered on the Mission Base Camp) was designed to simplify the process of site selection for the daily traverse planning. Additionally, the maps will help to accommodate the need of the field crew for the increased autonomy in the decision making process, forced by the induced time delay between MSC and "Mars". The set of provided maps should allow the field team to orientate and navigate in the explored areas as well as make informed decisions about choosing the best alternative traverses if the ones suggested by the flight planning team based on satellite data turn out to be impossible. The set of maps includes: A "geological map" prepared following suggestions of [3]. A set of experiment "suitability maps", one for every experiment, assessing the suitability of the area for an experiment. E.g., if a rover cannot move on surfaces that have an inclination larger than 5° and/or are covered with rocks larger than 15 cm in diameter, than the areas likely to have such conditions will be marked as not suitable for this experiment. "Danger" map - showing locations of all potentially dangerous places e.g., cliffs. "Mobility" map - with information important for estimating astronauts' mobility. During the mission maps will be updated on a daily basis, based on the observations made in the field. In this way quality of the maps (and predictions based on them) will be gradually improved. Acknowledges: We thank all people involved in the MARS2013 mission, especially Dr. Gernot Grömer, the President of Austrian Space Forum, MARS2013 program officer & expedition lead. References: [1] Sans Fuentes S.A. 2012. Human-Robotic Mars Science Operations: Target Selection Optimization via Traverse and Science Planning. (M.S. thesis). U. of Innsbruck. [2] Hettich S. 2012. Human-Robotic Mars Science Operations: Itinerary Optimisation for Surface Activities (M.S. thesis). U. of Innsbruck. [3] Skinner J.A.Jr., Fortezzo C.M. 2011. Acta Astronautica. http://dx.doi.org/10.1016/j.actaastro.2011.11.011.

  13. Hinners Point Above Floor of Marathon Valley on Mars

    NASA Image and Video Library

    2015-09-25

    This Martian scene shows contrasting textures and colors of "Hinners Point," at the northern edge of "Marathon Valley," and swirling reddish zones on the valley floor to the left. The view combines six frames taken by the panoramic camera (Pancam) on NASA's Mars Exploration Rover Opportunity on Aug. 14, 2015, during the 4,108th Martian day, or sol, of the rover's work on Mars. The summit takes its informal name as a tribute to Noel Hinners (1935-2014). For NASA's Apollo program, Hinners played important roles in selection of landing sites on the moon and scientific training of astronauts. He then served as NASA associate administrator for space science, director of the Smithsonian National Air and Space Museum, director of NASA's Goddard Space Flight Center, NASA chief scientist and associate deputy administrator of NASA. Subsequent to responsibility for the Viking Mars missions while at NASA, he spent the latter part of his career as vice president for flight systems at Lockheed Martin, where he had responsibility for the company's roles in development and operation of NASA's Mars Global Surveyor, Mars Reconnaissance Orbiter, Mars Odyssey, Phoenix Mars Lander, Stardust and Genesis missions. Marathon Valley cuts generally east-west through the western rim of Endeavour Crater. The valley's name refers to the distance Opportunity drove from its 2004 landing site to arrival at this location in 2014. The valley was a high-priority destination for the rover mission because observations from orbit detected clay minerals there. Dark rocks on Hinners Point show a pattern dipping downward toward the interior of Endeavour, to the right from this viewing angle. The strong dip may have resulted from the violence of the impact event that excavated the crater. Brighter rocks make up the valley floor. The reddish zones there may be areas where water has altered composition. Inspections by Opportunity have found compositions there are higher in silica and lower in iron than the typical composition of rocks on Endeavour's rim. The scene spans from west-southwest at left to northwest at right. The larger of two stones close to each other in the foreground left of center is about 5 inches (12 centimeters) wide. On bright bedrock to the right of those stones, Opportunity inspected a target informally named "Pvt. George Gibson." Another inspected target, "Pvt. Silas Goodrich," is on the valley floor near the left edge of this scene. The informal names for these targets refer to members of the Lewis and Clark expedition's Corps of Discovery. This version of the image is presented in approximate true color by combing exposures taken through three of the Pancam's color filters, centered on wavelengths of 753 nanometers (near-infrared), 535 nanometers (green) and 432 nanometers (violet). http://photojournal.jpl.nasa.gov/catalog/PIA19819

  14. Review of NASA's Planned Mars Program

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The exploration of Mars has long been a prime scientific objective of the U.S. planetary exploration program. Yet no U.S. spacecraft has successfully made measurements at Mars since the Viking missions of the late 1970s. Mars Observer, which was designed to conduct global observations from orbit, failed just before orbit insertion in 1993. The Russian spacecraft Phobos 2 did succeed in making some observations of the planet in 1989, but it was designed primarily to observe Phobos, the innermost satellite of Mars; the spacecraft failed 2 months after insertion into Mars orbit during the complex maneuvers required to rendezvous with the martian satellite. In fall 1996 NASA plans to launch Mars Pathfinder for a landing on the martian surface in mid-1997. This spacecraft is one of the first two missions in NASA's Discovery program that inaugurates a new style of planetary exploration in which missions are low-cost (less than $150 million) and have very focused science objectives. As can be seen in the comparative data presented in Box 1, this mission is considerably smaller in terms of cost, mass, and scope than NASA's previous Mars missions. NASA's FY 1995 budget initiated a continuing Mars exploration program, called Mars Surveyor, that involves multiple launches of spacecraft as small as or smaller than Mars Pathfinder to Mars over the next several launch opportunities, which recur roughly every 26 months. The first mission in the program, Mars Global Surveyor, set for launch late in 1996, is intended to accomplish many of the objectives of the failed Mars Observer. Like the Discovery program, Mars Surveyor is a continuing series of low-cost missions, each of which has highly focused science objectives. See Box 1 for comparative details of those Surveyor missions currently defined. Around the same time that the Mars Surveyor series was chosen as the centerpiece of NASA's solar system exploration program, the Committee on Planetary and Lunar Exploration (COMPLEX) designated Mars as one of four scientific targets for emphasis in future studies. It was against this background that the Space Studies Board charged COMPLEX to review whether the Mars Pathfinder and Surveyor programs, as presently conceived, satisfy the highest priorities for understanding Mars as provided in its report, An Integrated Strategy for the Planetary Sciences: 1995-2010. The present document is COMPLEX's assessment of the scientific potential of NASA's new approach to Mars exploration. This assessment considers how well the scientific objectives of the Mars Surveyor program match those of the Integrated Strategy; it also addresses some advantages and disadvantages of the smaller-faster-cheaper approach to the exploration of Mars. The capabilities of the various instruments are not discussed in detail since the Mars Observer instruments, all of which are scheduled for reflight, have already been assessed by COMPLEX2 and later instruments are, in general, not yet well defined.

  15. International Human Mission to Mars: Analyzing A Conceptual Launch and Assembly Campaign

    NASA Technical Reports Server (NTRS)

    Cates, Grant; Stromgren, Chel; Arney, Dale; Cirillo, William; Goodliff, Kandyce

    2014-01-01

    In July of 2013, U.S. Congressman Kennedy (D-Mass.) successfully offered an amendment to H.R. 2687, the National Aeronautics and Space Administration Authorization Act of 2013. "International Participation—The President should invite the United States partners in the International Space Station program and other nations, as appropriate, to participate in an international initiative under the leadership of the United States to achieve the goal of successfully conducting a crewed mission to the surface of Mars." This paper presents a concept for an international campaign to launch and assemble a crewed Mars Transfer Vehicle. NASA’s “Human Exploration of Mars: Design Reference Architecture 5.0” (DRA 5.0) was used as the point of departure for this concept. DRA 5.0 assumed that the launch and assembly campaign would be conducted using NASA launch vehicles. The concept presented utilizes a mixed fleet of NASA Space Launch System (SLS), U.S. commercial and international launch vehicles to accomplish the launch and assembly campaign. This concept has the benefit of potentially reducing the campaign duration. However, the additional complexity of the campaign must also be considered. The reliability of the launch and assembly campaign utilizing SLS launches augmented with commercial and international launch vehicles is analyzed and compared using discrete event simulation.

  16. PERCIVAL mission to Mars

    NASA Astrophysics Data System (ADS)

    Reed, David W.; Lilley, Stewart; Sirman, Melinda; Bolton, Paul; Elliott, Susan; Hamilton, Doug; Nickelson, James; Shelton, Artemus

    1992-12-01

    With the downturn of the world economy, the priority of unmanned exploration of the solar system has been lowered. Instead of foregoing all missions to our neighbors in the solar system, a new philosophy of exploration mission design has evolved to insure the continued exploration of the solar system. The 'Discovery-class' design philosophy uses a low cost, limited mission, available technology spacecraft instead of the previous 'Voyager-class' design philosophy that uses a 'do-everything at any cost' spacecraft. The Percival Mission to Mars was proposed by Ares Industries as one of the new 'Discovery-class' of exploration missions. The spacecraft will be christened Percival in honor of American astronomer Percival Lowell who proposed the existence of life on Mars in the early twentieth century. The main purpose of the Percival mission to Mars is to collect and relay scientific data to Earth suitable for designing future manned and unmanned missions to Mars. The measurements and observations made by Percival will help future mission designers to choose among landing sites based on the feasibility and scientific interest of the sites. The primary measurements conducted by the Percival mission include gravity field determination, surface and atmospheric composition, sub-surface soil composition, sub-surface seismic activity, surface weather patterns, and surface imaging. These measurements will be taken from the orbiting Percival spacecraft and from surface penetrators deployed from Mars orbit. The design work for the Percival Mission to Mars was divided among four technical areas: Orbits and Propulsion System, Surface Penetrators, Gravity and Science Instruments, and Spacecraft Structure and Systems. The results for each of the technical areas is summarized and followed by a design cost analysis and recommendations for future analyses.

  17. PERCIVAL mission to Mars

    NASA Technical Reports Server (NTRS)

    Reed, David W.; Lilley, Stewart; Sirman, Melinda; Bolton, Paul; Elliott, Susan; Hamilton, Doug; Nickelson, James; Shelton, Artemus

    1992-01-01

    With the downturn of the world economy, the priority of unmanned exploration of the solar system has been lowered. Instead of foregoing all missions to our neighbors in the solar system, a new philosophy of exploration mission design has evolved to insure the continued exploration of the solar system. The 'Discovery-class' design philosophy uses a low cost, limited mission, available technology spacecraft instead of the previous 'Voyager-class' design philosophy that uses a 'do-everything at any cost' spacecraft. The Percival Mission to Mars was proposed by Ares Industries as one of the new 'Discovery-class' of exploration missions. The spacecraft will be christened Percival in honor of American astronomer Percival Lowell who proposed the existence of life on Mars in the early twentieth century. The main purpose of the Percival mission to Mars is to collect and relay scientific data to Earth suitable for designing future manned and unmanned missions to Mars. The measurements and observations made by Percival will help future mission designers to choose among landing sites based on the feasibility and scientific interest of the sites. The primary measurements conducted by the Percival mission include gravity field determination, surface and atmospheric composition, sub-surface soil composition, sub-surface seismic activity, surface weather patterns, and surface imaging. These measurements will be taken from the orbiting Percival spacecraft and from surface penetrators deployed from Mars orbit. The design work for the Percival Mission to Mars was divided among four technical areas: Orbits and Propulsion System, Surface Penetrators, Gravity and Science Instruments, and Spacecraft Structure and Systems. The results for each of the technical areas is summarized and followed by a design cost analysis and recommendations for future analyses.

  18. Evolving EO-1 Sensor Web Testbed Capabilities in Pursuit of GEOSS

    NASA Technical Reports Server (NTRS)

    Mandi, Dan; Ly, Vuong; Frye, Stuart; Younis, Mohamed

    2006-01-01

    A viewgraph presentation to evolve sensor web capabilities in pursuit of capabilities to support Global Earth Observing System of Systems (GEOSS) is shown. The topics include: 1) Vision to Enable Sensor Webs with "Hot Spots"; 2) Vision Extended for Communication/Control Architecture for Missions to Mars; 3) Key Capabilities Implemented to Enable EO-1 Sensor Webs; 4) One of Three Experiments Conducted by UMBC Undergraduate Class 12-14-05 (1 - 3); 5) Closer Look at our Mini-Rovers and Simulated Mars Landscae at GSFC; 6) Beginning to Implement Experiments with Standards-Vision for Integrated Sensor Web Environment; 7) Goddard Mission Services Evolution Center (GMSEC); 8) GMSEC Component Catalog; 9) Core Flight System (CFS) and Extension for GMSEC for Flight SW; 10) Sensor Modeling Language; 11) Seamless Ground to Space Integrated Message Bus Demonstration (completed December 2005); 12) Other Experiments in Queue; 13) Acknowledgements; and 14) References.

  19. Co-Investigator Participation in the Mars-94 Mission Studies of the Mars-Solar Wind Interaction: Topside Sounder and Magnetometer

    NASA Technical Reports Server (NTRS)

    Luhmann, Janet G. (Principal Investigator)

    1996-01-01

    The purpose of this investigation has been to provide United States co-investigator support toward the preparation of the Topside Ionospheric Sounder and Magnetometer experiments on the Russian Mars-96 (previously Mars-94) mission. The main role has been to assist in the preparation of software tools for the optimum design of the investigation and the evaluation of mission operational plans and orbits.

  20. JPL-20180416-INSIGHf-0001-Marco Media Reel 1

    NASA Image and Video Library

    2018-04-16

    Mars Cube One is a Mars flyby mission consisting of two CubeSats that is planned for launch alongside NASA's InSight Mars lander mission. This will be the first interplanetary CubeSat mission. If successful, the CubeSats will relay entry, descent, and landing (EDL) data to Earth during InSight's landing.

  1. Moving to Mars: There and Back Again. Stress and the Psychology and Culture of Crew and Astronaut

    NASA Astrophysics Data System (ADS)

    Bishop, Sheryl L.

    2010-10-01

    The journey to explore our red neighbor will entail the application of all our terrestrial lessons learned and of some we have yet to discover. A Mars mission represents the extreme in terms of both distance and uncharted environment. The selection, monitoring and support of Mars bound crews will challenge existing technology and knowledge. The human, at the center, represents the greatest strength and the greatest weakness for a Mars mission. Human response to confined and isolated environments has been shown to be characterized by serious stressors and a Mars mission will represent the most extreme of such environments. The impact of such stressors on coping, performance, motivation, behavior, cognitive functioning and psychological well-being must be taken into account. The extraordinary duration of the mission poses special challenges in planning for mission support since very different needs may be driven by particular phases of the mission. Selection, monitoring and! support will similarly be significantly affected by anticipating potential differential characteristics and needs across the travel phases to and from Mars and the period on the planet's surface.

  2. A Review of Aerothermal Modeling for Mars Entry Missions

    NASA Technical Reports Server (NTRS)

    Wright, Michael J; Tang, Chun Y.; Edquist, Karl T.; Hollis, Brian R.; Krasa, Paul

    2009-01-01

    The current status of aerothermal analysis for Mars entry missions is reviewed. The aeroheating environment of all Mars missions to date has been dominated by convective heating. Two primary uncertainties in our ability to predict forebody convective heating are turbulence on a blunt lifting cone and surface catalysis in a predominantly CO2 environment. Future missions, particularly crewed vehicles, will encounter additional heating from shock-layer radiation due to a combination of larger size and faster entry velocity. Localized heating due to penetrations or other singularities on the aeroshell must also be taken into account. The physical models employed to predict these phenomena are reviewed, and key uncertainties or deficiencies inherent in these models are explored. Capabilities of existing ground test facilities to support aeroheating validation are also summarized. Engineering flight data from the Viking and Pathfinder missions, which may be useful for aerothermal model validation, are discussed, and an argument is presented for obtaining additional flight data. Examples are taken from past, present, and future Mars entry missions, including the twin Mars Exploration Rovers and the Mars Science Laboratory, scheduled for launch by NASA in 2011.

  3. 2001 Mars Odyssey Mission

    NASA Technical Reports Server (NTRS)

    Varghese, Philip

    2008-01-01

    This viewgraph presentation reviews the 2001 Mars Odyssey Mission. The contents include: 1) Mission Overview; 2) Current Scope of Work: 3) Facilities; 4) Critical Role of DSN; 5) Relay as Mission Supplement; 6) Current Mars Telecom Infrastructure; 7) PHX EDL Comm Overview; 8) EDL Geometry (Entry through Landing); 9) Phoenix Support; 10) Preparations for Phoenix; 11) EDL Support Timeline; 12) One Year Rolling Schedule; 13) E3 Rationale; and 14) Spacecraft Status.

  4. The UV Sensor Onboard the Mars Science Laboratory Mission: Correction and Generation of UV Fluxes

    NASA Astrophysics Data System (ADS)

    Vicente-Retortillo, Á.; Martinez, G.; Renno, N. O.; Lemmon, M. T.; Gomez-Elvira, J.

    2017-12-01

    The Rover Environmental Monitoring Station UV sensor (UVS) onboard the Mars Science Laboratory mission has completed more than 1750 sols of measurements, providing an unprecedented coverage ranging from diurnal to interannual times scales [1,2]. The UVS is comprised of six photodiodes to measure the UV flux in the ranges 200-380, 320-380, 280-320, 200-280, 230-290 and 300-350 nm [3]. UV fluxes in units of W/m2 can be found in the NASA Planetary Data System (PDS). However, dust deposition on the UVS and a non-physical discontinuity in the calibration functions when the solar zenith angle is above 30º cause errors in these fluxes that increase with time. We have developed a technique to correct UV fluxes from the effects of dust degradation and inconsistencies in the angular response of the UVS. The photodiode output currents (available in the PDS as lower-level TELRDR products), ancillary data records (available in the PDS as ADR products) and dust opacity values derived from Mastcam observations are used for performing the corrections. The corrections have been applied to the UVA band (320-380 nm) for the first 1000 sols of the mission, providing excellent results [4]. We plan to correct the UV fluxes on each of the six UVS bands and to make these results available in the PDS. Data products generated by this study will allow comparisons of the UV radiation environment at Gale crater with that at the locations of the future missions ExoMars 2020 and Mars 2020, as well as the assessment of the potential survivability of biological contaminants brought to Mars from Earth. References: [1] Smith, M. D., et al. (2016), Aerosol optical depth as observed by the Mars Science Laboratory REMS UV photodiodes, Icarus, 280, 234-248. [2] Vicente-Retortillo, Á., et al. (2017), Determination of dust aerosol particle size at Gale Crater using REMS UVS and Mastcam measurements, Geophys. Res. Lett., 44, 3502-3508. [3] Gómez-Elvira, J., et al. (2012), REMS: The environmental sensor suite for the Mars Science Laboratory rover, Space Sci. Rev. 170 (1-4), 583-640. [4] Martínez, G.M., et al. (2017), Generation of UV Radiation Data at Gale Crater by Correcting REMS UV Measurements from Dust Deposition and Sensor's Angular Response, LPSC 48.

  5. The Gulliver Mission: A Short-Cut to Primitive Body and Mars Sample Return

    NASA Astrophysics Data System (ADS)

    Britt, D. T.

    2003-05-01

    The Martian moon Deimos has extraordinary potential for future sample return missions. Deimos is spectrally similar to D-type asteroids and may be a captured primitive asteroid that originated in the outer asteroid belt. This capture probably took place in the earliest periods of Martian history, over 4.4 Gyrs ago [1], and Deimos has been accumulating material ejected from the Martian surface ever since. Analysis of Martian ejecta, material accumulation, capture cross-section, regolith over-turn, and Deimos's albedo suggest that Mars material may make up as much as 10% of Deimos's regolith. The Martian material on Deimos would be dominated by ejecta from the ancient crust of Mars, delivered during the Noachian Period of basin-forming impacts and heavy bombardment. Deimos could be a repository of samples from ancient Mars, including the full range of Martian crustal and upper mantle material from the early differentiation and crustal-forming epoch as well as samples from the era of high volatile flux, thick atmosphere, and possible surface water. In addition to Martian ejecta, 90% of the Deimos sample will be spectral type D asteroidal material. D-type asteroids are thought to be highly primitive and are most common in the difficult to access outer asteroid belt and the Jupiter Trojans. The Gulliver Mission proposes to directly collect up to 10 kilograms of Deimos regolith and return it to Earth. This sample may contain up to 1000 grams of Martian material along with up to 9 kilograms of primitive asteroidal material. Because of stochastic processes of regolith mixing over 4.4 Gyrs, the rock fragments and grains will likely sample the diversity of the Martian ancient surface as well as the asteroid. In essence, Gulliver represents two shortcuts, to Mars sample return and to the outer asteroid belt. References: [1] Burns J. A. (1992) Mars (Kieffer H. H. et al., eds), 1283-1302.

  6. Mars Telecommunications Orbiter, Artist's Concept

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This illustration depicts a concept for NASA's Mars Telecommunications Orbiter in flight around Mars. The orbiter is in development to be the first spacecraft with a primary function of providing communication links while orbiting a foreign planet. The project's plans call for launch in September 2009, arrival at Mars in August 2010 and a mission of six to 10 years while in orbit. Mars Telecommunication Orbiter would serve as the Mars hub for an interplanetery Internet, greatly increasing the information payoff from other future Mars missions. The mission is designed to orbit Mars more than 10 times farther from the planet than orbiters dedicated primarily to science. The high-orbit design minimizes the time that Mars itself blocks the orbiter from communicating with Earth and maximizes the time that the orbiter is above the horizon -- thus capable of communications relay -- for rovers and stationary landers on Mars' surface.

  7. The effect of interplanetary trajectory options on a manned Mars aerobrake configuration

    NASA Technical Reports Server (NTRS)

    Braun, Robert D.; Powell, Richard W.; Hartung, Lin C.

    1990-01-01

    Manned Mars missions originating in low Earth orbit (LEO) in the time frame 2010 to 2025 were analyzed to identify preferred mission opportunities and their associated vehicle and trajectory characteristics. Interplanetary and Mars atmospheric trajectory options were examined under the constraints of an initial manned exploration scenario. Two chemically propelled vehicle options were considered: (1) an all propulsive configuration, and (2) a configuration which employs aerobraking at Earth and Mars with low lift/drag (L/D) shapes. Both the interplanetary trajectory options as well as the Mars atmospheric passage are addressed to provide a coupled trajectory simulation. Direct and Venus swingby interplanetary transfers with a 60 day Mars stopover are considered. The range and variation in both Earth and Mars entry velocity are also defined. Two promising mission strategies emerged from the study: (1) a 1.0 to 2.0 year Venus swingby mission, and (2) a 2.0 to 2.5 year direct mission. Through careful trajectory selection, 11 mission opportunities are identified in which the Mars entry velocity is between 6 and 10 km/sec and Earth entry velocity ranges from 11.5 to 12.5 km/sec. Simulation of the Earth return aerobraking maneuver is not performed. It is shown that a low L/D configuration is not feasible for Mars aerobraking without substantial improvements in the interplanetary navigation system. However, even with an advanced navigation system, entry corridor and aerothermal requirements restrict the number of potential mission opportunities. It is also shown that for a large blunt Mars aerobrake configuration, the effects of radiative heating can be significant at entry velocities as low as 6.2 km/sec and will grow to dominate the aerothermal environment at entry velocities above 8.5 km/sec. Despite the additional system complexity associated with an aerobraking vehicle, the use of aerobraking was shown to significantly lower the required initial LEO weight. In comparison with an all propulsive mission, savings between 19 and 59 percent were obtained depending upon launch date.

  8. MetNet Precursor - Network Mission to Mars

    NASA Astrophysics Data System (ADS)

    Harri, Arri-Matti

    2010-05-01

    We are developing a new kind of planetary exploration mission for Mars - MetNet in situ observation network based on a new semi-hard landing vehicle called the Met-Net Lander (MNL). The first MetNet vehicle, MetNet Precursor, slated for launch in 2011. The MetNet development work started already in 2001. The actual practical Precursor Mission development work started in January 2009 with participation from various space research institutes and agencies. The scientific rationale and goals as well as key mission solutions will be discussed. The eventual scope of the MetNet Mission is to deploy some 20 MNLs on the Martian surface using inflatable descent system structures, which will be supported by observations from the orbit around Mars. Currently we are working on the MetNet Mars Precursor Mission (MMPM) to deploy one MetNet Lander to Mars in the 2011 launch window as a technology and science demonstration mission. The MNL will have a versatile science payload focused on the atmospheric science of Mars. Time-resolved in situ Martian meteorological measurements acquired by the Viking, Mars Pathfinder and Phoenix landers and remote sensing observations by the Mariner 9, Viking, Mars Global Surveyor, Mars Odyssey and the Mars Express orbiters have provided the basis for our current understanding of the behavior of weather and climate on Mars. However, the available amount of data is still scarce and a wealth of additional in situ observations are needed on varying types of Martian orography, terrain and altitude spanning all latitudes and longitudes to address microscale and mesoscale atmospheric phenomena. Detailed characterization of the Martian atmospheric circulation patterns and climatological cycles requires simultaneous in situ atmospheric observations. The scientific payload of the MetNet Mission encompasses separate instrument packages for the atmospheric entry and descent phase and for the surface operation phase. The MetNet mission concept and key probe technologies have been developed and the critical subsystems have been qualified to meet the Martian environmental and functional conditions. The flight unit of the landing vehicle has been manufactured and tested. This development effort has been fulfilled in collaboration between the Finnish Meteorological Institute (FMI), the Russian Lavoschkin Association (LA) and the Russian Space Research Institute (IKI) since August 2001. INTA (Instituto Nacional de Técnica Aeroespacial) from Spain joined the MetNet Mission team in 2008, and is participating significantly in the MetNet payload development.

  9. Mars Science Laboratory (MSL) : the US 2009 Mars rover mission

    NASA Technical Reports Server (NTRS)

    Palluconi, Frank; Tampari, Leslie; Steltzner, Adam; Umland, Jeff

    2003-01-01

    The Mars Science Laboratory mission is the 2009 United States Mars Exploration Program rover mission. The MSL Project expects to complete its pre-Phase A definition activity this fiscal year (FY2003), investigations in mid-March 2004, launch in 2009, arrive at Mars in 2010 during Northern hemisphere summer and then complete a full 687 day Mars year of surface exploration. MSL will assess the potential for habitability (past and present) of a carefully selected landing region on Mars by exploring for the chemical building blocks of life, and seeking to understand quantitatively the chemical and physical environment with which these components have interacted over the geologic history of the planet. Thus, MSL will advance substantially our understanding of the history of Mars and potentially, its capacity to sustain life.

  10. Field Simulation of a Drilling Mission to Mars to Search for Subsurface Life

    NASA Technical Reports Server (NTRS)

    Stoker, C. R.; Lemke, L. G.; Cannon, H.; Glass, B.; Dunagan, S.; Zavaleta, J.; Miller, D.; Gomez-Elvira, J.

    2005-01-01

    The discovery of near surface ground ice by the Mars Odyssey mission and the abundant evidence for recent Gulley features observed by the Mars Global Surveyor mission support longstanding theoretical arguments for subsurface liquid water on Mars. Thus, implementing the Mars program goal to search for life points to drilling on Mars to reach liquid water, collecting samples and analyzing them with instrumentation to detect in situ organisms and biomarker compounds. Searching for life in the subsurface of Mars will require drilling, sample extraction and handling, and new technologies to find and identify biomarker compounds and search for living organisms. In spite of its obvious advantages, robotic drilling for Mars exploration is in its technological infancy and has yet to be demonstrated in even a terrestrial field environment.

  11. Mars Mission Concepts: SAR and Solar Electric Propulsion

    NASA Astrophysics Data System (ADS)

    Elsperman, M.; Klaus, K.; Smith, D. B.; Clifford, S. M.; Lawrence, S. J.

    2012-12-01

    Introduction: The time has come to leverage technology advances (including advances in autonomous operation and propulsion technology) to reduce the cost and increase the flight rate of planetary missions, while actively developing a scientific and engineering workforce to achieve national space objectives. Mission Science at Mars: A SAR imaging radar offers an ability to conduct high resolution investigations of the shallow (<10 m depth) subsurface of Mars, enabling identification of fine-scale layering within the Martian polar layered deposits (PLD), as well as the identification of pingos, investigations of polygonal terrain, and measurements of the thickness of mantling layers at non-polar latitudes. It would allow systematic near-surface prospecting, which is tremendously useful for human exploration purposes (in particular, the identification of accessible ice deposits and quantification of Martian regolith properties). Limited color capabilities in a notional high-resolution stereo imaging system would enable the generation of false color images, resulting in useful science results, and the stereo data could be reduced into high-resolution Digital Elevation Models uniquely useful for exploration planning and science purposes. Since the SAR and the notional high-resolution stereo imaging system would be huge data volume producers - to maximize the science return we are currently considering the usage of laser communications systems; this notional spacecraft represents one pathway to evaluate the utility of laser communications in planetary exploration while providing useful science return.. Mission Concept: Using a common space craft for multiple missions reduces costs. Solar electric propulsion (SEP) provides the flexibility required for multiple mission objectives. SEP provides the greatest payload advantage albeit at the sacrifice of mission time. Our concept involves using a SEP enabled space craft (Boeing 702SP) with a highly capable SAR imager that also conducts autonomous rendezvous and docking experiments accomplished from Mars orbit. Our concept of operations is to launch on May 5, 2018 using a launch vehicle with 2000kg launch capacity with a C3 of 7.4. After reaching Mars it takes 145 days to spiral down to a 250 km orbit above the surface of Mars when Mars SAR operations begin. Summary/Conclusions: A robust and compelling Mars mission can be designed to meet the 2018 Mars launch window opportunity. Using advanced in-space power and propulsion technologies like High Power Solar Electric Propulsion provides enormous mission flexibility to execute the baseline science mission and conduct necessary Mars Sample Return Technology Demonstrations in Mars orbit on the same mission. An observation spacecraft platform like the high power (~5Kw) 702SP at Mars also enables the use of a SAR instrument to reveal new insights and understanding of the Mars regolith for both science and future manned exploration and utilization.

  12. Attracting Students to Space Science Fields: Mission to Mars

    NASA Astrophysics Data System (ADS)

    Congdon, Donald R.; Lovegrove, William P.; Samec, Ronald G.

    Attracting high school students to space science is one of the main goals of Bob Jones University's annual Mission to Mars (MTM). MTM develops interest in space exploration through a highly realistic simulated trip to Mars. Students study and learn to appreciate the challenges of space travel including propulsion life support medicine planetary astronomy psychology robotics and communication. Broken into teams (Management Spacecraft Design Communications Life Support Navigation Robotics and Science) they address the problems specific to each aspect of the mission. Teams also learn to interact and recognize that a successful mission requires cooperation. Coordinated by the Management Team the students build a spacecraft and associated apparatus connect computers and communications equipment train astronauts on the mission simulator and program a Pathfinder-type robot. On the big day the astronauts enter the spacecraft as Mission Control gets ready to support them through the expected and unexpected of their mission. Aided by teamwork the astronauts must land on Mars perform their scientific mission on a simulated surface of mars and return home. We see the success of MTM not only in successful missions but in the students who come back year after year for another MTM.

  13. The upper atmosphere and ionosphere of Mars

    NASA Technical Reports Server (NTRS)

    Brace, Larry H.

    1992-01-01

    The topics discussed include the following: the dynamic atmosphere of Mars; possible similarities with Earth and Venus; the atmosphere and ionosphere of Mars; solar wind interactions; future approved missions; and possible future mission.

  14. Overview of the Mars Reconnaissance Orbiter mission

    NASA Technical Reports Server (NTRS)

    Mateer, B.; Graf, J.; Zurek, R.; Jones, R.; Eisen, H.; Johnston, M.; Jai, D. B.

    2002-01-01

    The Mars Reconnaissance Orbiter will deliver to Mars orbit a payload to conduct remote sensing science observations, characterize sites for future landers, and provide critical telecom/navigation relay capability for follow-on missions.

  15. Planetary science questions for the manned exploration of Mars

    NASA Technical Reports Server (NTRS)

    Blanchard, Douglas P.

    1986-01-01

    A major goal of a manned Mars mission is to explore the planet and to investigate scientific questions for which the intensive study of Mars is essential. The systematic exploration of planets was outlined by the National Academy of Science. The nearest analogy to the manned Mars mission is the Apollo program and manned missions to the Moon, but the analogy is limited. The case is argued here that Mars may have to be explored far more systematically than was the pre-Apollo Moon to provide the detailed information necessary if plans are made to use any of the resources available on Mars. Viking missions provided a wealth of information, yet there are great gaps in the fundamental knowledge of essential facts such as the properties of the Martian surface materials and their interaction with the atmosphere. Building on a strong data base of precursor missions, human exploration will allow great leaps in understanding the Martian environment and geologic history and its evolutionary role in the solar system.

  16. Status of the French Mars Exploration Program

    NASA Astrophysics Data System (ADS)

    Bonneville, R.; Counil, J.-L.; Rocard, F.

    2002-01-01

    The French Mars exploration initiative named PREMIER (Programme de Retour d'Echantillons Martiens et Installation d'Expériences en Réseau) is a long term, multiform co- operative program including as its two main components : - the development with a consortium of European partners (Finland, Germany, Belgium) and the deployment of a network of 4 small Mars ground stations for performing geophysical measurements (NetLander project) ; - a participation to the future Mars Sample Return mission (MSR) in cooperation with NASA including the development and the operation of the orbiter vehicle of this mission. Its additional elements are : - instrument contributions to ESA's Mars Express mission ; - payload contributions to the orbiters and landers &rovers of the future missions to Mars, and especially to NASA's "smart lander" mission dedicated to in situ investigations. This program wants to ensure the complementarity between its three poles : (i) global investigations from the orbit, (ii) landed science with both network science (NetLanders) and in situ investigations, and (iii) sample return. A major step in the PREMIER program will be the 2007 orbiter mission ; this precursor vehicle developed by CNES and launched by Ariane 5 in September 2007 will first deliver the 4 NetLanders at Mars and then will be inserted in Mars orbit. This orbiter will perform technological tests aiming at preparing the future Mars Sample Return mission, it will ensure a telecommunication relay function for the NetLanders and it will be used for an additional orbital science mission. While the NetLanders will study the internal structure of Mars and its climate, with the goal to operate a full Martian year, the primary objectives of the orbital science mission will be complementary of those of the NetLanders, with an emphasis on the study of the Martian atmosphere. In a first phase, the orbiter will be on a 500 km x 500 km circular, near polar, Sun-synchronous orbit around 12 am local time, which is optimal for the NetLander relay. In a second phase, the orbit will be lowered around 350 km for the benefit of the orbital science. A very low periapsis phase (170 km x 1000 km) is foreseen for some experiments. The nominal mission will end in September 2011, with the hope of an extended mission beyond this date.

  17. Preparing for Mars: The Evolvable Mars Campaign 'Proving Ground' Approach

    NASA Technical Reports Server (NTRS)

    Bobskill, Marianne R.; Lupisella, Mark L.; Mueller, Rob P.; Sibille, Laurent; Vangen, Scott; Williams-Byrd, Julie

    2015-01-01

    As the National Aeronautics and Space Administration (NASA) prepares to extend human presence beyond Low Earth Orbit, we are in the early stages of planning missions within the framework of an Evolvable Mars Campaign. Initial missions would be conducted in near-Earth cis-lunar space and would eventually culminate in extended duration crewed missions on the surface of Mars. To enable such exploration missions, critical technologies and capabilities must be identified, developed, and tested. NASA has followed a principled approach to identify critical capabilities and a "Proving Ground" approach is emerging to address testing needs. The Proving Ground is a period subsequent to current International Space Station activities wherein exploration-enabling capabilities and technologies are developed and the foundation is laid for sustained human presence in space. The Proving Ground domain essentially includes missions beyond Low Earth Orbit that will provide increasing mission capability while reducing technical risks. Proving Ground missions also provide valuable experience with deep space operations and support the transition from "Earth-dependence" to "Earth-independence" required for sustainable space exploration. A Technology Development Assessment Team identified a suite of critical technologies needed to support the cadence of exploration missions. Discussions among mission planners, vehicle developers, subject-matter-experts, and technologists were used to identify a minimum but sufficient set of required technologies and capabilities. Within System Maturation Teams, known challenges were identified and expressed as specific performance gaps in critical capabilities, which were then refined and activities required to close these critical gaps were identified. Analysis was performed to identify test and demonstration opportunities for critical technical capabilities across the Proving Ground spectrum of missions. This suite of critical capabilities is expected to provide the foundation required to enable a variety of possible destinations and missions consistent with the Evolvable Mars Campaign.. The International Space Station will be used to the greatest extent possible for exploration capability and technology development. Beyond this, NASA is evaluating a number of options for Proving Ground missions. An "Asteroid Redirect Mission" will demonstrate needed capabilities (e.g., Solar Electric Propulsion) and transportation systems for the crew (i.e., Space Launch System and Orion) and for cargo (i.e., Asteroid Redirect Vehicle). The Mars 2020 mission and follow-on robotic precursor missions will gather Mars surface environment information and will mature technologies. NASA is considering emplacing a small pressurized module in cis-lunar space to support crewed operations of increasing duration and to serve as a platform for critical exploration capabilities testing (e.g., radiation mitigation; extended duration deep space habitation). In addition, "opportunistic mission operations" could demonstrate capabilities not on the Mars critical path that may, nonetheless, enhance exploration operations (e.g., teleoperations, crew assisted Mars sample return). The Proving Ground may also include "pathfinder" missions to test and demonstrate specific capabilities at Mars (e.g., entry, descent, and landing). This paper describes the (1) process used to conduct an architecture-driven technology development assessment, (2) exploration mission critical and supporting capabilities, and (3) approach for addressing test and demonstration opportunities encompassing the spectrum of flight elements and destinations consistent with the Evolvable Mars Campaign.

  18. Impact of Utilizing Photos and Deimos as Waypoints for Mars Human Surface Missions

    NASA Technical Reports Server (NTRS)

    Cianciolo, Alicia D.; Brown, Kendall

    2015-01-01

    Phobos and Deimos, the moons of Mars, are interesting exploration destinations that offer extensibility of the Asteroid Redirect Mission (ARM) technologies. Solar Electric Propulsion (SEP), asteroid rendezvous and docking, and surface operations can be used to land on and explore the moons of Mars. The close Mars vicinity of Phobos and Deimos warrant examining them as waypoints, or intermediate staging orbits, for Mars surface missions. This paper outlines the analysis performed to determine the mass impact of using the moons of Mars both as an intermediate staging point for exploration as well as for in-situ recourse utilization, namely propellant, to determine if the moons are viable options to include in the broader Mars surface exploration architecture.

  19. Quick trips to Mars

    NASA Technical Reports Server (NTRS)

    Hornung, R.

    1991-01-01

    The design of a Mars Mission Vehicle that would have to be launched by two very heavy lift launch vehicles is described along with plans for a mission to Mars. The vehicle has three nuclear engine for rocket vehicle application (NERVA) boosters with a fourth in the center that acts as a dual mode system. The fourth generates electrical power while in route, but it also helps lift the vehicle out of earth orbit. A Mars Ascent Vehicle (MAV), a Mars transfer vehicle stage, and a Mars Excursion Vehicle (MEV) are located on the front end of this vehicle. Other aspects of this research including aerobraking, heat shielding, nuclear thermal rocket engines, a mars mission summary, closed Brayton cycle with and without regeneration, liquid hydrogen propellant storage, etc. are addressed.

  20. EXPLORING MARS WITH SOLAR-POWERED ROVERS

    NASA Technical Reports Server (NTRS)

    Landis, Geoffrey A.

    2006-01-01

    The Mars Exploration Rover (MER) project landed two solar-powered rovers, "Spirit" and "Opportunity," on the surface of Mars in January of 2003. This talk reviews the history of solar-powered missions to Mars and looks at the science mission of the MER rovers, focusing on the solar energy and array performance.

  1. Joint US-USSR Long duration Antarctic Mars calibration Balloon (LAMB) mission

    NASA Technical Reports Server (NTRS)

    Floyd, S. R.; Trombka, J. I.; Evans, L. G.; Starr, R.; Squyres, S. W.; Surkov, Iu. A.; Moskaleva, L. P.; Shcheglov, O.; Mitugov, A. G.; Rester, A. C.

    1991-01-01

    The Long duration Antarctic Mars calibration Balloon (LAMB) project has been established at Goddard Space Flight Center for the evaluation and cross calibration of U.S. and USSR remote sensing gamma-ray and neutron detectors. These detectors are analogs of those flown on the Soviet Phobos mission around Mars and those to be flown on the upcoming U.S. Mars Observer mission. Cosmic rays, which are normally filtered out by the atmosphere, and the earth's magnetic field, will induce gamma-ray and neutron emissions from about a half ton of simulated Mars soil aboard the gondola. The cross calibration of these instruments should greatly facilitate the data analysis from both missions and play a role in U.S.-USSR cooperation in space.

  2. Mars mission safety

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buden, D.

    1989-06-01

    Precautions that need to be taken to assure safety on a manned Mars mission with nuclear thermal propulsion are briefly considered. What has been learned from the 1955 SNAP-10A operation of a nuclear reactor in space and from the Rover/NERVA project is reviewed. The ways that radiation hazards can be dealt with at various stages of a Mars mission are examined.

  3. Space transfer concepts and analysis for exploration missions

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Covered here is the second phase of a broad scoped and systematic study of space transfer concepts for human lunar and Mars missions. The study addressed issues that were raised during Phase 1, developed generic Mars missions profile analysis data, and conducted preliminary analysis of the Mars in-space transportation requirements and implementation from the Stafford Committee Synthesis Report.

  4. Adaptable, Deployable Entry and Placement Technology (ADEPT) for Future Mars Missions

    NASA Technical Reports Server (NTRS)

    Wercinski, P.; Venkatapathy, E.; Gage, P.; Prabhu, D.; Smith, B.; Cassell, A.; Yount, B.; Allen, G.

    2013-01-01

    The concept of a mechanically deploy- able hypersonic decelerator, developed initially for high mass (40 MT) human Mars missions, is currently funded by OCT for technology maturation. The ADEPT (Adaptive, Deployable Entry and Placement Technology) project has broad, game-changing applicability to in situ science missions to Venus, Mars, and the Outer Planets.

  5. A manned Mars mission concept with artificial gravity

    NASA Technical Reports Server (NTRS)

    Davis, Hubert P.

    1986-01-01

    A series of simulated manned Mars missions was analyzed by a computer model. Numerous mission opportunities and mission modes were investigated. Sensitivity trade studies were performed of the vehicle all-up mass and propulsion stage sizes as a function of various levels of conservatism in mission velocity increment margins, payload mass and propulsive stage characteristics. The longer duration but less energetic type of conjunction class mission is emphasized. The specific mission opportunity reviewed was for a 1997 departure. From the trade study results, a three and one-half stage vehicle concept evolved, utilizing a Trans-Mars Injection (TMI) first stage derived from the Space Shuttle External Tank (ET).

  6. X-Ray Diffraction and Fluorescence Measurements for In Situ Planetary Instruments

    NASA Astrophysics Data System (ADS)

    Hansford, G.; Hill, K. S.; Talboys, D.; Vernon, D.; Ambrosi, R.; Bridges, J.; Hutchinson, I.; Marinangeli, L.

    2011-12-01

    The ESA/NASA ExoMars mission, due for launch in 2018, has a combined X-ray fluorescence/diffraction instrument, Mars-XRD, as part of the onboard analytical laboratory. The results of some XRF (X-ray fluorescence) and XRD (X-ray diffraction) tests using a laboratory chamber with representative performance are reported. A range of standard geological reference materials and analogues were used in these tests. The XRD instruments are core components of the forthcoming NASA Mars Science Laboratory (MSL) and ESA/NASA ExoMars missions and will provide the first demonstrations of the capabilities of combined XRD/XRF instrumentation in situ on an extraterrestrial planetary surface. The University of Leicester team is part of the Italy-UK collaboration that is responsible for building the ExoMars X-ray diffraction instrument, Mars-XRD [1,2]. Mars-XRD incorporates an Fe-55 radioisotope source and three fixed-position charge-coupled devices (CCDs) to simultaneously acquire an X-ray fluorescence spectrum and a diffraction pattern providing a measurement of both elemental and mineralogical composition. The CCDs cover an angular range of 2θ = 6° to 73° enabling the analysis of a wide range of geologically important minerals including phyllosilicates, feldspars, oxides, carbonates and evaporites. The identification of hydrous minerals may help identify past Martian hydrothermal systems capable of preserving traces of life. Here we present some initial findings from XRF and XRD tests carried out at the University of Leicester using an Fe-55 source and X-ray sensitive CCD. The XRF/XRD test system consists of a single CCD on a motorised arm, an Fe-55 X-ray source, a collimator and a sample table which approximately replicate the reflection geometry of the Mars-XRD instrument. It was used to test geological reference standard materials and Martian analogues. This work was funded by the Science and Technology Facilities Council, UK. References [1] Marinangeli, L., Hutchinson, I., Baliva, A., Stevoli, A., Ambrosi, R., Critani, F., Delhez, R., Scandelli, L., Holland, A., Nelms, N. & the Mars-XRD Team, Proceedings of the 38th Lunar and Planetary Science Conference, 12 - 16 March 2007, League City, Texas, USA. [2] L. Marinangeli, I. B. Hutchinson, A. Stevoli, G. Adami, R. Ambrosi, R. Amils, V. Assis Fernandes, A. Baliva, A. T. Basilevsky, G. Benedix, P. Bland, A. J. Böttger, J. Bridges, G. Caprarelli, G. Cressey, F. Critani, N. d'Alessandro, R. Delhez, C. Domeneghetti, D. Fernandez-Remolar, R. Filippone, A. M. Fioretti, J. M. Garcia Ruiz, M. Gilmore, G. M. Hansford, G. Iezzi, R. Ingley, M. Ivanov, G. Marseguerra, L. Moroz, C. Pelliciari, P. Petrinca, E. Piluso, L. Pompilio, J. Sykes, F. Westall and the MARS-XRD Team, EPSC-DPS Joint Meeting 2011, 3 - 7 October 2011, La Cité Internationale des Congrès Nantes Métropole, Nantes, France.

  7. Post-aerocapture orbit selection and maintenance for the Aerofast mission to Mars

    NASA Astrophysics Data System (ADS)

    Pontani, Mauro; Teofilatto, Paolo

    2012-10-01

    Aerofast is the abbreviation of “aerocapture for future space transportation” and represents a project aimed at developing aerocapture techniques with regard to an interplanetary mission to Mars, in the context of the 7th Framework Program, with the financial support of the European Union. This paper describes the fundamental characteristics of the operational orbit after aerocapture for the mission of interest, as well as the related maintenance strategy. The final orbit selection depends on the desired lighting conditions, maximum revisit time of specific target regions, and feasibility of the orbit maintenance strategy. A sunsynchronous, frozen, repeating-ground-track orbit is chosen. First, the period of repetition is such that adjacent ascending node crossings (over the Mars surface) have a separation compatible with the swath of the optical payload. Secondly, the sunsynchronism condition ensures that a given latitude is periodically visited at the same local time, which condition is essential for comparing images of the same region at different epochs. Lastly, the fulfillment of the frozen condition guarantees improved orbit stability with respect to perturbations due to the zonal harmonics of Mars gravitational field. These three fundamental features of the operational orbit lead to determining its mean orbital elements. The evaluation of short and long period effects (e.g., those due to the sectorial harmonics of the gravitational field or to the aerodynamic drag) requires the determination of the osculating orbital elements at an initial reference time. This research describes a simple and accurate approach that leads to numerically determining these initial values, without employing complicated analytical developments. Numerical simulations demonstrate the long-period stability of the orbit when a significant number of harmonics of the gravitational field are taken into account. However, aerodynamic drag produces a relatively slow orbital decay at the altitudes considered for the mission. This circumstance implies the progressive loss of the sunsynchronism condition, and therefore corrective maneuvers are to be performed. This work proves that actually only in-plane maneuvers are necessary, evaluates the overall delta-v budget needed in the period of repetition (85 Martian nodal days), and proposes a simple maintenance strategy, making reference to the worst-case scenario, which corresponds to the highest seasonal values of the atmospheric density and to the maximum value of the ballistic coefficient of the spacecraft.

  8. NASA Mars 2020 Rover Mission: New Frontiers in Science

    NASA Technical Reports Server (NTRS)

    Calle, Carlos I.

    2014-01-01

    The Mars 2020 rover mission is the next step in NASAs robotic exploration of the red planet. The rover, based on the Mars Science Laboratory Curiosity rover now on Mars, will address key questions about the potential for life on Mars. The mission would also provide opportunities to gather knowledge and demonstrate technologies that address the challenges of future human expeditions to Mars.Like the Mars Science Laboratory rover, which has been exploring Mars since 2012, the Mars 2020 spacecraft will use a guided entry, descent, and landing system which includes a parachute, descent vehicle, and, during the provides the ability to land a very large, heavy rover on the surface of Mars in a more precise landing area. The Mars 2020 mission is designed to accomplish several high-priority planetary science goals and will be an important step toward meeting NASAs challenge to send humans to Mars in the 2030s. The mission will conduct geological assessments of the rover's landing site, determine the habitability of the environment, search for signs of ancient Martian life, and assess natural resources and hazards for future human explorers. The science instruments aboard the rover also will enable scientists to identify and select a collection of rock and soil samples that will be stored for potential return to Earth in the future. The rover also may help designers of a human expedition understand the hazards posed by Martian dust and demonstrate how to collect carbon dioxide from the atmosphere, which could be a valuable resource for producing oxygen and rocket fuel.

  9. Human Factor Studies on a Mars Analogue During Crew 100b International Lunar Exploration Working Group EuroMoonMars Crew: Proposed New Approaches for Future Human Space and Interplanetary Missions.

    PubMed

    Rai, Balwant; Kaur, Jasdeep

    2012-11-01

    Knowing the risks, costs, and complexities associated with human missions to Mars, analogue research can be a great (low-risk) tool for exploring the challenges associated with the preparation for living, operating, and undertaking research in interplanetary missions. Short-duration analogue studies, such as those being accomplished at the Mars Desert Research Station (MDRS), offer the chance to study mission operations and human factors in a simulated environment, and therefore contribute to exploration of the Moon and Mars in planned future missions. This article is based upon previously published articles, abstracts, and presentations by a series of independent authors, human factor studies performed on mars analogue station by Crew 100B. The MDRS Crew 100B performed studies over 15 days providing a unique insight into human factor issues in simulated short-duration Mars mission. In this study, 15 human factors were evaluated and analyzed by subjective and objective means, and from the summary of results it was concluded that optimum health of an individual and the crew as a whole is a necessity in order to encourage and maintain high performance and the satisfaction of project goals.

  10. Human Factor Studies on a Mars Analogue During Crew 100b International Lunar Exploration Working Group EuroMoonMars Crew: Proposed New Approaches for Future Human Space and Interplanetary Missions

    PubMed Central

    Rai, Balwant; Kaur, Jasdeep

    2012-01-01

    Knowing the risks, costs, and complexities associated with human missions to Mars, analogue research can be a great (low-risk) tool for exploring the challenges associated with the preparation for living, operating, and undertaking research in interplanetary missions. Short-duration analogue studies, such as those being accomplished at the Mars Desert Research Station (MDRS), offer the chance to study mission operations and human factors in a simulated environment, and therefore contribute to exploration of the Moon and Mars in planned future missions. This article is based upon previously published articles, abstracts, and presentations by a series of independent authors, human factor studies performed on mars analogue station by Crew 100B. The MDRS Crew 100B performed studies over 15 days providing a unique insight into human factor issues in simulated short-duration Mars mission. In this study, 15 human factors were evaluated and analyzed by subjective and objective means, and from the summary of results it was concluded that optimum health of an individual and the crew as a whole is a necessity in order to encourage and maintain high performance and the satisfaction of project goals. PMID:23181225

  11. A mission design for International Manned Mars Mission - From the 1991 International Space University (ISU) Design Project

    NASA Technical Reports Server (NTRS)

    Mendell, Wendell W.

    1991-01-01

    The International Space University (ISU) conducted a study of an international program to support human exploration of Mars as its annual Design Project activity during its 1991 summer session in Toulouse, France. Although an ISU Design Project strives to produce an in-depth analysis during the intense 10-week summer session, the International Mars Mission (IMM) project was conducted in a manner designed to provide a learning experience for young professionals working in an unusual multidisciplinary and multinational environment. The breadth of the IMM study exceeds that of most Mars mission studies of the past, encompassing political organization for long-term commitment, multinational management structure, cost analysis, mission architecture, vehicle configuration, crew health, life support, Mars surface infrastructure, mission operations, technology evaluation, risk assessment, scientific planning, exploration, communication networks, and Martian resource utilization. The IMM Final Report has particular value for those seeking insight into the choices made by a multinational group working in an apolitical environment on the problems of international cooperation in space.

  12. Objectives for Mars Orbital Missions in the 2020s: Report from a MEPAG Science Analysis Group

    NASA Astrophysics Data System (ADS)

    Zurek, R. W.; Campbell, B. A.; Diniega, S.; Lock, R. E.

    2015-12-01

    NASA Headquarters is looking at possible missions to Mars to follow the proposed 2020 Mars rover mission currently in development. One option being considered is a multi-functional orbiter, launched in the early 2020's, whose capabilities could address objectives in the following areas: • Replenishment of the telecommunications and reconnaissance infrastructure presently provided by the aging Mars Odyssey and Mars Reconnaissance Orbiters; • Scientific and technical progress on the NRC Planetary Science Decadal Survey priorities, updated MEPAG Goals, and/or follow-up of new discoveries; • Location and quantification of in situ resources for utilization by future robotic and human surface-based missions; and • Data needed to address Strategic Knowledge Gaps (SKGs), again for possible human missions. The Mars Exploration Program Analysis Group (MEPAG) was asked to prepare an analysis of possible science objectives and remote sensing capabilities that could be implemented by such a multi-purpose Mars orbiter launched in the 2022/24 timeframe. MEPAG conducted this analysis through formation of a Next Orbiter Science Analysis Group (NEX-SAG), which was chartered jointly by the NASA Science and Human Exploration Directorates. The SAG was asked to conduct this study within a range of mission capabilities, including the possible first use of Solar Electric Propulsion (SEP) in the Mars system. SEP could provide additional power enabling new payload components and possible changes in orbit (e.g., orbital inclination change) that permit different mission observational campaigns (e.g., polar and non-polar). Special attention was paid towards identifying synergies between science investigations, reconnaissance, and resource/SKG needs. We will present the findings and conclusions of this NEX-SAG regarding possible objectives for the next NASA Orbiter to Mars.

  13. The Nuclear Thermal Propulsion Stage (NTPS): A Key Space Asset for Human Exploration and Commercial Missions to the Moon

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; McCurdy, David R.; Burke, Laura M.

    2014-01-01

    The nuclear thermal rocket (NTR) has frequently been discussed as a key space asset that can bridge the gap between a sustained human presence on the Moon and the eventual human exploration of Mars. Recently, a human mission to a near Earth asteroid (NEA) has also been included as a "deep space precursor" to an orbital mission of Mars before a landing is attempted. In his "post-Apollo" Integrated Space Program Plan (1970 to 1990), Wernher von Braun, proposed a reusable Nuclear Thermal Propulsion Stage (NTPS) to deliver cargo and crew to the Moon to establish a lunar base initially before sending human missions to Mars. The NTR was selected because it was a proven technology capable of generating both high thrust and high specific impulse (Isp approx. 900 s)-twice that of today's best chemical rockets. During the Rover and NERVA programs, 20 rocket reactors were designed, built and successfully ground tested. These tests demonstrated the (1) thrust levels; (2) high fuel temperatures; (3) sustained operation; (4) accumulated lifetime; and (5) restart capability needed for an affordable in-space transportation system. In NASA's Mars Design Reference Architecture (DRA) 5.0 study, the "Copernicus" crewed NTR Mars transfer vehicle used three 25 klbf "Pewee" engines-the smallest and highest performing engine tested in the Rover program. Smaller lunar transfer vehicles-consisting of a NTPS with three approx. 16.7 klbf "SNRE-class" engines, an in-line propellant tank, plus the payload-can be delivered to LEO using a 70 t to LEO upgraded SLS, and can support reusable cargo delivery and crewed lunar landing missions. The NTPS can play an important role in returning humans to the Moon to stay by providing an affordable in-space transportation system that can allow initial lunar outposts to evolve into settlements capable of supporting commercial activities. Over the next decade collaborative efforts between NASA and private industry could open up new exploration and commercial opportunities for both organizations. With efficient NTP, commercial habitation and crew delivery systems, a "mobile cislunar research station" can transport crews to small NEAs delivered to the E-ML2 point. Also possible are week-long "lunar tourism" missions that can carry passengers into lunar orbit for sightseeing (and plenty of picture taking), then return them to Earth orbit where they would re-enter and land using a small reusable lifting body based on NASA's HL-20 design. Mission descriptions, key vehicle features and operational characteristics are described and presented.

  14. A concept for NASA's Mars 2016 astrobiology field laboratory.

    PubMed

    Beegle, Luther W; Wilson, Michael G; Abilleira, Fernando; Jordan, James F; Wilson, Gregory R

    2007-08-01

    The Mars Program Plan includes an integrated and coordinated set of future candidate missions and investigations that meet fundamental science objectives of NASA and the Mars Exploration Program (MEP). At the time this paper was written, these possible future missions are planned in a manner consistent with a projected budget profile for the Mars Program in the next decade (2007-2016). As with all future missions, the funding profile depends on a number of factors that include the exact cost of each mission as well as potential changes to the overall NASA budget. In the current version of the Mars Program Plan, the Astrobiology Field Laboratory (AFL) exists as a candidate project to determine whether there were (or are) habitable zones and life, and how the development of these zones may be related to the overall evolution of the planet. The AFL concept is a surface exploration mission equipped with a major in situ laboratory capable of making significant advancements toward the Mars Program's life-related scientific goals and the overarching Vision for Space Exploration. We have developed several concepts for the AFL that fit within known budget and engineering constraints projected for the 2016 and 2018 Mars mission launch opportunities. The AFL mission architecture proposed here assumes maximum heritage from the 2009 Mars Science Laboratory (MSL). Candidate payload elements for this concept were identified from a set of recommendations put forth by the Astrobiology Field Laboratory Science Steering Group (AFL SSG) in 2004, for the express purpose of identifying overall rover mass and power requirements for such a mission. The conceptual payload includes a Precision Sample Handling and Processing System that would replace and augment the functionality and capabilities provided by the Sample Acquisition Sample Processing and Handling system that is currently part of the 2009 MSL platform.

  15. Flashline Mars Arctic Research Station (FMARS) 2009 Crew Perspectives

    NASA Technical Reports Server (NTRS)

    Ferrone, Kristine; Cusack, Stacy L.; Garvin, Christy; Kramer, Walter Vernon; Palaia, Joseph E., IV; Shiro, Brian

    2010-01-01

    A crew of six "astronauts" inhabited the Mars Society s Flashline Mars Arctic Research Station (FMARS) for the month of July 2009, conducting a simulated Mars exploration mission. In addition to the various technical achievements during the mission, the crew learned a vast amount about themselves and about human factors relevant to a future mission to Mars. Their experiences, detailed in their own words, show the passion of those with strong commitment to space exploration and detail the human experiences for space explorers including separation from loved ones, interpersonal conflict, dietary considerations, and the exhilaration of surmounting difficult challenges.

  16. Mars Stratigraphy Mission

    NASA Technical Reports Server (NTRS)

    Budney, C. J.; Miller, S. L.; Cutts, J. A.

    2000-01-01

    The Mars Stratigraphy Mission lands a rover on the surface of Mars which descends down a cliff in Valles Marineris to study the stratigraphy. The rover carries a unique complement of instruments to analyze and age-date materials encountered during descent past 2 km of strata. The science objective for the Mars Stratigraphy Mission is to identify the geologic history of the layered deposits in the Valles Marineris region of Mars. This includes constraining the time interval for formation of these deposits by measuring the ages of various layers and determining the origin of the deposits (volcanic or sedimentary) by measuring their composition and imaging their morphology.

  17. Can We Power Future Mars Missions?

    NASA Technical Reports Server (NTRS)

    Balint, Tibor S.; Sturm, Erick J., II; Woolley, Ryan C.; Jordan, James F.

    2006-01-01

    The Vision for Space Exploration identified the exploration of Mars as one of the key pathways. In response, NASAs Mars Program Office is developing a detailed mission lineup for the next decade that would lead to future explorations. Mission architectures for the next decade include both orbiters and landers. Existing power technologies, which could include solar panels, batteries, radioisotope power systems, and in the future fission power, could support these missions. Second and third decade explorations could target human precursor and human in-situ missions, building on increasingly complex architectures. Some of these could use potential feed forward from earlier Constellation missions to the Moon, discussed in the ESAS study. From a potential Mars Sample Return mission to human missions the complexity of the architectures increases, and with it the delivered mass and power requirements also amplify. The delivered mass at Mars mostly depends on the launch vehicle, while the landed mass might be further limited by EDL technologies, including the aeroshell, parachutes, landing platform, and pinpoint landing. The resulting in-situ mass could be further divided into payload elements and suitable supporting power systems. These power systems can range from tens of watts to multi-kilowatts, influenced by mission type, mission configuration, landing location, mission duration, and season. Regardless, the power system design should match the power needs of these surface assets within a given architecture. Consequently, in this paper we will identify potential needs and bounds of delivered mass and architecture dependent power requirements to surface assets that would enable future in-situ exploration of Mars.

  18. A performance comparison of nuclear electric and nuclear thermal propulsion for Mars cargo missions across the 15-17 year synodic cycle

    NASA Technical Reports Server (NTRS)

    Sponaugle, Steven J.; Davis, Steven F.; Everett, Shonn F.

    1992-01-01

    This paper examines the effects of the Earth-Mars synodic cycle on Mars cargo missions. Cargo vehicles that use nuclear thermal propulsion are compared with those that use nuclear electric propulsion. It will be shown that for low energy class cargo missions, nuclear electric systems exhibit far less variation in peak performance over the synodic cycle than comparable nuclear thermal systems. Performance is measured by the amount of usable mass delivered to Mars, as well as the initial mass requirements in nuclear safe orbit. Nuclear electric propulsion systems also have significantly longer injection window opportunities for a given 26 month synodic period, resulting in much greater mission design flexibility. Injection window opportunities over a 20 year period from 2010 to 2030 are examined. This covers a complete synodic cycle and shows its effects on performance for Mars cargo missions.

  19. Near Earth Asteroid Human Mission Possibilities Using Nuclear Thermal Rocket (NTR) Propulsion

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley; McCurdy, David R.; Packard, Thomas W.

    2012-01-01

    The NTR is a proven technology that generates high thrust and has a specific impulse (Isp (is) approximately 900 s) twice that of today's best chemical rockets. During the Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) programs, twenty rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability - all the requirements needed for a human mission to Mars. Ceramic metal fuel was also evaluated as a backup option. In NASA's recent Mars Design reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower launch mass, versatile vehicle design, simple assembly, and growth potential. In contrast to other advanced propulsion options, NTP requires no large technology scale-ups. In fact, the smallest engine tested during the Rover program - the 25 klbf 'Pewee' engine is sufficient for a human Mars mission when used in a clustered engine configuration. The 'Copernicus crewed NTR Mars transfer vehicle design developed for DRA 5.0 has significant capability that can enable reusable '1-year' round trip human missions to candidate near Earth asteroids (NEAs) like 1991 JW in 2027, or 2000 SG344 and Apophis in 2028. A robotic precursor mission to 2000 SG344 in late 2023 could provide an attractive Flight Technology Demonstration of a small NTR engine that is scalable to the 25 klbf-class engine used for human missions 5 years later. In addition to the detailed scientific data gathered from on-site inspection, human NEA missions would also provide a valuable 'check out' function for key elements of the NTR transfer vehicle (its propulsion module, TransHab and life support systems, etc.) in a 'deep space' environment prior to undertaking the longer duration Mars orbital and landing missions that would follow. The initial mass in low Earth orbit required for a mission to Apophis is approximately 323 t consisting of the NTR propulsion module ((is) approximately 138 t), the integrated saddle truss and LH2 drop tank assembly ((is) approximately 123 t), and the 6-crew payload element ((is) approximately 62 t). The later includes a multi-mission Space Excursion Vehicle (MMSEV) used for close-up examination and sample gathering. The total burn time and required restarts on the three 25 klbf 'Pewee-class' engines operating at Isp (is) approximately 906 s, are approximately 76.2 minutes and 4, respectively, well below the 2 hours and 27 restarts demonstrated on the NERVA eXperimental Engine, the NRX-XE. The paper examines the benefits, requirements and characteristics of using NTP for the above NEA missions. The impacts on vehicle design of HLV payload volume and lift capability, crew size, and reusability are also quantified.

  20. Overview of a Preliminary Destination Mission Concept for a Human Orbital Mission to the Martial Moons

    NASA Technical Reports Server (NTRS)

    Mazanek, D. D.; Abell, P. A.; Antol, J.; Barbee, B. W.; Beaty, D. W.; Bass, D. S.; Castillo-Rogez, J. C.; Coan, D. A.; Colaprete, A.; Daugherty, K. J.; hide

    2012-01-01

    The National Aeronautics and Space Administration s Human Spaceflight Architecture Team (HAT) has been developing a preliminary Destination Mission Concept (DMC) to assess how a human orbital mission to one or both of the Martian moons, Phobos and Deimos, might be conducted as a follow-on to a human mission to a near-Earth asteroid (NEA) and as a possible preliminary step prior to a human landing on Mars. The HAT Mars-Phobos-Deimos (MPD) mission also permits the teleoperation of robotic systems by the crew while in the Mars system. The DMC development activity provides an initial effort to identify the science and exploration objectives and investigate the capabilities and operations concepts required for a human orbital mission to the Mars system. In addition, the MPD Team identified potential synergistic opportunities via prior exploration of other destinations currently under consideration.

  1. The ISECG Science White Paper - A Scientific Perspective on the Global Exploration Roadmap

    NASA Astrophysics Data System (ADS)

    Bussey, David B.; Worms, Jean-Claude; Spiero, Francois; Schlutz, Juergen; Ehrenfreund, Pascale

    2016-07-01

    Future space exploration goals call for sending humans and robots beyond low Earth orbit and establishing sustained access to destinations such as the Moon, asteroids and Mars. Space agencies participating in the International Space Exploration Coordination Group (ISECG) are discussing an international approach for achieving these goals, documented in ISECG's Global Exploration Roadmap (GER). The GER reference scenario reflects a step-wise evolution of critical capabilities from ISS to missions in the lunar vicinity in preparation for the journey of humans to Mars. As an element of this continued road mapping effort, the ISECG agencies are therefore soliciting input and coordinated discussion with the scientific community to better articulate and promote the scientific opportunities of the proposed mission themes. An improved understanding of the scientific drivers and the requirements to address priority science questions associated with the exploration destinations (Moon, Near Earth Asteroids, Mars and its moons) as well as the preparatory activities in cis-lunar space is beneficial to optimize the partnership of robotic assets and human presence beyond low Earth orbit. The interaction has resulted in the development of a Science White Paper to: • Identify and highlight the scientific opportunities in early exploration missions as the GER reference architecture matures, • Communicate overarching science themes and their relevance in the GER destinations, • Ensure international science communities' perspectives inform the future evolution of mission concepts considered in the GER The paper aims to capture the opportunities offered by the missions in the GER for a broad range of scientific disciplines. These include planetary and space sciences, astrobiology, life sciences, physical sciences, astronomy and Earth science. The paper is structured around grand science themes that draw together and connect research in the various disciplines, and it will focus on opportunities created by the near-term mission themes in the GER centred around 1) extended duration crew missions to an exploration habitat in cis-lunar space, 2) crew mission(s) to an asteroid, and 3) crew missions to the lunar surface. The preparation of that Science White Paper has been coordinated and led by an external Science Advisory Group composed of scientists form a variety of nations. The first draft of this White Paper has been discussed on the occasion of a COSPAR-ISECG-ESF workshop organised in Paris on 10-11 February 2016. The recommendations developed at the workshop provide further input that is incorporated in the final version of the ISECG Science White Paper, expected to be published in the fall of 2016. The authors aim to present the rationale and contents of this White Paper on the occasion of the COSPAR Assembly.

  2. A preliminary study of Mars rover/sample return missions

    NASA Technical Reports Server (NTRS)

    1987-01-01

    The Solar System Exploration Committee (SSEC) of the NASA Advisory Council recommends that a Mars Sample Return mission be undertaken before the year 2000. Comprehensive studies of a Mars Sample Return mission have been ongoing since 1984. The initial focus of these studies was an integrated mission concept with the surface rover and sample return vehicle elements delivered to Mars on a single launch and landed together. This approach, to be carried out as a unilateral U.S. initiative, is still a high priority goal in an Augmented Program of exploration, as the SSEC recommendation clearly states. With this background of a well-understood mission concept, NASA decided to focus its 1986 study effort on a potential opportunity not previously examined; namely, a Mars Rover/Sample Return (MRSR) mission which would involve a significant aspect of international cooperation. As envisioned, responsibility for the various mission operations and hardware elements would be divided in a logical manner with clearly defined and acceptable interfaces. The U.S. and its international partner would carry out separately launched but coordinated missions with the overall goal of accomplishing in situ science and returning several kilograms of surface samples from Mars. Important considerations for implementation of such a plan are minimum technology transfer, maximum sharing of scientific results, and independent credibility of each mission role. Under the guidance and oversight of a Mars Exploration Strategy Advisory Group organized by NASA, a study team was formed in the fall of 1986 to develop a preliminary definition of a flight-separable, cooperative mission. The selected concept assumes that the U.S. would undertake the rover mission with its sample collection operations and our international partner would return the samples to Earth. Although the inverse of these roles is also possible, this study report focuses on the rover functions of MRSR because rover operations have not been studied in as much detail as the sample return functions of the mission.

  3. Planetary Protection Issues in the Human Exploration of Mars

    NASA Technical Reports Server (NTRS)

    Criswell, Marvin E.; Race, M. S.; Rummel, J. D.; Baker, A.

    2005-01-01

    This workshop report, long delayed, is the first 21st century contribution to what will likely be a series of reports examining the effects of human exploration on the overall scientific study of Mars. The considerations of human-associated microbial contamination were last studied in a 1990 workshop ("Planetary Protection Issues and Future Mars Missions," NASA CP-10086, 1991), but the timing of that workshop allowed neither a careful examination of the full range of issues, nor an appreciation for the Mars that has been revealed by the Mars Global Surveyor and Mars Pathfinder missions. Future workshops will also have the advantage of Mars Odyssey, the Mars Exploration Rover missions, and ESA's Mars Express, but the Pingree Park workshop reported here had both the NCR's (1992) concern that "Missions carrying humans to Mars will contaminate the planet" and over a decade of careful study of human exploration objectives to guide them and to reconcile. A daunting challenge, and one that is not going to be simple (as the working title of this meeting, "When Ecologies Collide?" might suggest), it is clear that the planetary protection issues will have to be addressed to enable human explorers to safely and competently extend out knowledge about Mars, and its potential as a home for life whether martian or human.

  4. Planetary Protection Issues in the Human Exploration of Mars

    NASA Astrophysics Data System (ADS)

    Criswell, Marvin E.; Race, M. S.; Rummel, J. D.; Baker, A.

    2005-06-01

    This workshop report, long delayed, is the first 21st century contribution to what will likely be a series of reports examining the effects of human exploration on the overall scientific study of Mars. The considerations of human-associated microbial contamination were last studied in a 1990 workshop ("Planetary Protection Issues and Future Mars Missions," NASA CP-10086, 1991), but the timing of that workshop allowed neither a careful examination of the full range of issues, nor an appreciation for the Mars that has been revealed by the Mars Global Surveyor and Mars Pathfinder missions. Future workshops will also have the advantage of Mars Odyssey, the Mars Exploration Rover missions, and ESA's Mars Express, but the Pingree Park workshop reported here had both the NCR's (1992) concern that "Missions carrying humans to Mars will contaminate the planet" and over a decade of careful study of human exploration objectives to guide them and to reconcile. A daunting challenge, and one that is not going to be simple (as the working title of this meeting, "When Ecologies Collide?" might suggest), it is clear that the planetary protection issues will have to be addressed to enable human explorers to safely and competently extend out knowledge about Mars, and its potential as a home for life whether martian or human.

  5. Low cost manned Mars mission based on indigenous propellant production

    NASA Technical Reports Server (NTRS)

    Bruckner, A. P.; Cinnamon, M.; Hamling, S.; Mahn, K.; Phillips, J.; Westmark, V.

    1993-01-01

    The paper describes a low-cost approach to the manned exploration of Mars (which involves an unmanned mission followed two years later by a manned mission) based on near-term technologies and in situ propellant production. Particular attention is given to the basic mission architecture and its major components, including the orbital analysis, the unmanned segment, the Earth Return Vehicle, the aerobrake design, life sciences, guidance, communications, power, propellant production, the surface rovers, and Mars science. Also discussed are the cost per mission over an assumed 8-yr initiative.

  6. An Autonomous Instrument Package for Providing 'Pathfinder' Network Measurements on the Surface of Mars

    NASA Technical Reports Server (NTRS)

    Banerdt, W. B.; Lognonne, Ph.

    2003-01-01

    The investigations of the interior and atmosphere of Mars have been identified as high scientific priorities in most planetary exploration strategy document since the time of Viking. Most recently, the National Academy of Sciences has recommended a long-lived Mars network mission as its second highest scientific priority for Mars (after sample return) for the purpose of performing seismological investigations of the interior and studying the activity and composition of the atmosphere. Despite consistent recommendations by advisory groups, Mars network missions (MESUR, Marsnet, InterMarsnet, NetLander/MSR 05, NetLander/Premier 07, NetLander/?? 09) have undergone a strikingly consistent 'Phoenix' cycle of death and rebirth over the past 15 years, and there are still no confirmed plans to address the interior and atmosphere of Mars. The latest attempt is the NetLander mission. The objective of NetLander is to place a network of four landers on Mars to perform detailed measurements of the seismicity and atmospheric pressure, temperature, wind, humidity, and opacity (as well as provide images, subsurface radar sounding profiles, and electric/magnetic field measurements). However, this mission has recently encountered major programmatic difficulties within CNES and NASA. NASA has already cancelled its participation and the mission itself is facing imminent cancellation if CNES cannot solve programmatic issues associated with launching the mission in 2009. In this presentation we will describe an approach that could move us closer to realizing the goals of a Mars network mission and will secure at least one geophysical and meteorological observatory in 2009.

  7. Telecommunications and navigation systems design for manned Mars exploration missions

    NASA Astrophysics Data System (ADS)

    Hall, Justin R.; Hastrup, Rolf C.

    1989-06-01

    This paper discusses typical manned Mars exploration needs for telecommunications, including preliminary navigation support functions. It is a brief progress report on an ongoing study program within the current NASA JPL Deep Space Network (DSN) activities. A typical Mars exploration case is defined, and support approaches comparing microwave and optical frequency performance for both local in situ and Mars-earth links are described. Optical telecommunication and navigation technology development opportunities in a Mars exploration program are also identified. A local Mars system telecommunication relay and navigation capability for service support of all Mars missions has been proposed as part of an overall solar system communications network. The effects of light-time delay and occultations on real-time mission decision-making are discussed; the availability of increased local mass data storage may be more important than increasing peak data rates to earth. The long-term frequency use plan will most likely include a mix of microwave, millimeter-wave and optical link capabilities to meet a variety of deep space mission needs.

  8. Telecommunications and navigation systems design for manned Mars exploration missions

    NASA Technical Reports Server (NTRS)

    Hall, Justin R.; Hastrup, Rolf C.

    1989-01-01

    This paper discusses typical manned Mars exploration needs for telecommunications, including preliminary navigation support functions. It is a brief progress report on an ongoing study program within the current NASA JPL Deep Space Network (DSN) activities. A typical Mars exploration case is defined, and support approaches comparing microwave and optical frequency performance for both local in situ and Mars-earth links are described. Optical telecommunication and navigation technology development opportunities in a Mars exploration program are also identified. A local Mars system telecommunication relay and navigation capability for service support of all Mars missions has been proposed as part of an overall solar system communications network. The effects of light-time delay and occultations on real-time mission decision-making are discussed; the availability of increased local mass data storage may be more important than increasing peak data rates to earth. The long-term frequency use plan will most likely include a mix of microwave, millimeter-wave and optical link capabilities to meet a variety of deep space mission needs.

  9. Emirates Mars Mission Planetary Protection Plan

    NASA Astrophysics Data System (ADS)

    Awadhi, Mohsen Al

    2016-07-01

    The United Arab Emirates is planning to launch a spacecraft to Mars in 2020 as part of the Emirates Mars Mission (EMM). The EMM spacecraft, Amal, will arrive in early 2021 and enter orbit about Mars. Through a sequence of subsequent maneuvers, the spacecraft will enter a large science orbit and remain there throughout the primary mission. This paper describes the planetary protection plan for the EMM mission. The EMM science orbit, where Amal will conduct the majority of its operations, is very large compared to other Mars orbiters. The nominal orbit has a periapse altitude of 20,000 km, an apoapse altitude of 43,000 km, and an inclination of 25 degrees. From this vantage point, Amal will conduct a series of atmospheric investigations. Since Amal's orbit is very large, the planetary protection plan is to demonstrate a very low probability that the spacecraft will ever encounter Mars' surface or lower atmosphere during the mission. The EMM team has prepared methods to demonstrate that (1) the launch vehicle targets support a 0.01% probability of impacting Mars, or less, within 50 years; (2) the spacecraft has a 1% probability or less of impacting Mars during 20 years; and (3) the spacecraft has a 5% probability or less of impacting Mars during 50 years. The EMM mission design resembles the mission design of many previous missions, differing only in the specific parameters and final destination. The following sequence describes the mission: 1.The mission will launch in July, 2020. The launch includes a brief parking orbit and a direct injection to the interplanetary cruise. The launch targets are specified by the hyperbolic departure's energy C3, and the hyperbolic departure's direction in space, captured by the right ascension and declination of the launch asymptote, RLA and DLA, respectively. The targets of the launch vehicle are biased away from Mars such that there is a 0.01% probability or less that the launch vehicle arrives onto a trajectory that impacts Mars. 2.The spacecraft is deployed from the launch vehicle and powers on. 3.Within the first month, the spacecraft executes a trajectory correction maneuver to remove the launch bias. The target of this maneuver may still have a small bias to further reduce the probability of inadvertently impacting Mars. 4.Four additional trajectory correction maneuvers are scheduled and planned in the interplanetary cruise in order to target the precise arrival conditions at Mars. The targeted arrival conditions are specified by an altitude above the surface of Mars and an inclination relative to Mars' equator. The closest approach to Mars during the Mars Orbit Insertion (MOI) is over 600 km and the periapsis altitude of the first orbit about Mars is nominally 500 km. The inclination of the first orbit about Mars is nominally around 18 degrees. 5.The Mars Orbit Insertion is performed as a pitch-over burn, approaching no closer than approximately 600 km, and targeting a capture orbit period of 35-40 hours. 6.The spacecraft Capture Orbit has a nominal periapse altitude of 500 km, a nominal apoapse altitude of approximately 45,000 km, and a nominal period of approximately 35 hours. The mission expects that this orbit will be somewhat different after executing the real MOI due to maneuver execution errors. The full range of expected Capture Orbit sizes is acceptable from a planetary protection perspective. 7.The spacecraft remains in the Capture Orbit for two months. 8.The spacecraft then executes three maneuvers in the Transition to Science phase, raising the orbital periapse, raising the orbit inclination, adjusting the apoapse, and placing the argument of periapse near a value of 177 deg. The three maneuvers are nominally one week apart. The first maneuver is large and will raise the periapse significantly, thereafter significantly reducing the probability of Amal impacting Mars in the future.

  10. Mars Descent Imager for Curiosity

    NASA Image and Video Library

    2010-07-19

    A pocketknife provides scale for this image of the Mars Descent Imager camera; the camera will fly on the Curiosity rover of NASA Mars Science Laboratory mission. Malin Space Science Systems, San Diego, Calif., supplied the camera for the mission.

  11. Orbital Transfer Techniques for Round-Trip Mars Missions

    NASA Astrophysics Data System (ADS)

    Landau, D. F.; Barbee, B. W.; Woolley, R. C.; Gershman, R.

    2012-06-01

    Efficient methods to transfer among a variety of Mars orbits is presented. Emphasis is placed on connecting arrival and departure interplanetary trajectories to an arbitrary circular target orbit for a hybrid human/robotic Mars sample return mission.

  12. Planetary Protection for Polar Mars Missions

    NASA Technical Reports Server (NTRS)

    Rummel, J. D.

    2003-01-01

    The picture of Mars that is emerging from the Mars Global Surveyor and Odyssey results contrasts markedly from that portrayed shortly after the Viking missions ended. Particularly intriguing is the abundance of water ice seen both in the polar caps themselves, and in lower latitudes outside of the polar regions. Along with the new data comes a heightened consideration of the potential for biological contamination that may be carried by future missions, and its possible effects. Particularly challenging are scenarios where missions carrying perennial heat sources of high capacity and longevity (e.g., Radioisotope Thermoelectric Generators) could, by non-nominal landings or other mission operations be introduced to close contact with water ice on Mars - potentially forming Earthlike environments that could accommodate the growth of contaminant organisms.

  13. Mission Plan for the Mars Surveyor 2001 Orbiter and Lander

    NASA Technical Reports Server (NTRS)

    Plaut, J. J.; Spencer, D. A.

    1999-01-01

    The Mars Surveyor 2001 Project consists of two missions to Mars, an Orbiter and a Lander, both to be launched in the spring of 2001 for October 2001 (Orbiter) and January 2002 (Lander) arrival at Mars. The Orbiter will support the Lander mission primarily as a communications relay system; the Lander will not have direct-to-Earth communications capability. Science data collected from the Orbiter will also be used to aid in the geologic interpretation of the landing site, along with data from past missions. Combining the Orbiter and Lander missions into a single Project has enabled the streamlining of many activities and an efficient use of personnel and other resources at the Jet Propulsion Laboratory and at the spacecraft contractor, Lockheed Martin Astronautics.

  14. The Challenges of Searching, Finding, Reading, Understanding and Using Mars Mission Datasets for Science Analysis

    NASA Technical Reports Server (NTRS)

    Johnson, Jeffrey R.

    2006-01-01

    This viewgraph presentation reviews the problems that non-mission researchers have in accessing data to use in their analysis of Mars. The increasing complexity of Mars datasets results in custom software development by instrument teams that is often the only means to visualize and analyze the data. The solutions to the problem are to continue efforts toward synergizing data from multiple missions and making the data, s/w, derived products available in standardized, easily-accessible formats, encourage release of "lite" versions of mission-related software prior to end-of-mission, and planetary image data should be systematically processed in a coordinated way and made available in an easily accessed form. The recommendations of Mars Environmental GIS Workshop are reviewed.

  15. Mars Sample Return as a Feed-Forward into Planetary Protection for Crewed Missions to the Martian Surface

    NASA Astrophysics Data System (ADS)

    Spry, J. A.; Siegel, B.

    2018-04-01

    PP implementation is a required part of crewed exploration of Mars. Determining how PP is achieved is contingent on improved knowledge of Mars, best obtained in part by analysis of martian material of known provenance, as part of a Mars Sample Return mission.

  16. Calculation of Operations Efficiency Factors for Mars Surface Missions

    NASA Technical Reports Server (NTRS)

    Laubach, Sharon

    2014-01-01

    The duration of a mission--and subsequently, the minimum spacecraft lifetime--is a key component in designing the capabilities of a spacecraft during mission formulation. However, determining the duration is not simply a function of how long it will take the spacecraft to execute the activities needed to achieve mission objectives. Instead, the effects of the interaction between the spacecraft and ground operators must also be taken into account. This paper describes a method, using "operations efficiency factors", to account for these effects for Mars surface missions. Typically, this level of analysis has not been performed until much later in the mission development cycle, and has not been able to influence mission or spacecraft design. Further, the notion of moving to sustainable operations during Prime Mission--and the effect that change would have on operations productivity and mission objective choices--has not been encountered until the most recent rover missions (MSL, the (now-cancelled) joint NASA-ESA 2018 Mars rover, and the proposed rover for Mars 2020). Since MSL had a single control center and sun-synchronous relay assets (like MER), estimates of productivity derived from MER prime and extended missions were used. However, Mars 2018's anticipated complexity (there would have been control centers in California and Italy, and a non-sun-synchronous relay asset) required the development of an explicit model of operations efficiency that could handle these complexities. In the case of the proposed Mars 2018 mission, the model was employed to assess the mission return of competing operations concepts, and as an input to component lifetime requirements. In this paper we provide examples of how to calculate the operations efficiency factor for a given operational configuration, and how to apply the factors to surface mission scenarios. This model can be applied to future missions to enable early effective trades between operations design, science mission planning, and spacecraft design.

  17. Evolution of a Mars Airplane Concept for the ARES Mars Scout Mission

    NASA Technical Reports Server (NTRS)

    Smith, Stephen C.; Guynn, Mark D.; Smith, Stephen C.; Parks, Robert W.; Gelhausen, Paul A.

    2004-01-01

    ARES (Aerial Regional-scale Environmental Survey of Mars) is a proposed Mars Scout mission using an airplane to provide high-value science measurements in the areas of atmospheric chemistry, surface geology and mineralogy, and crustal magnetism. The use of an airplane for robotic exploration of Mars has been studied for over 25 years. There are, however, significant challenges associated with getting an airplane to Mars and flying through the thin, carbon dioxide Martian atmosphere. The traditional wisdom for aircraft design does not always apply for this type of vehicle and geometric, aerodynamic, and mission constraints result in a limited feasible design space. The ARES airplane design is the result of a concept exploration and evolution involving a number of trade studies, downselects, and design refinements. Industry, university, and NASA partners initially proposed a number of different concepts, drawing heavily on past Mars airplane design experience. Concept downselects were conducted with qualitative evaluation and high level analyses, focused on the most important parameters for the ARES mission. Following a successful high altitude test flight of the basic configuration, additional design refinement led to the current design. The resulting Mars airplane concept enables the high-value science objectives of the ARES mission to be accomplished while also fulfilling the desire for a simple, low-risk design.

  18. Radiation environment and shielding for early manned Mars missions

    NASA Technical Reports Server (NTRS)

    Hall, Stephen B.; Mccann, Michael E.

    1986-01-01

    The problem of shielding a crew during early manned Mars missions is discussed. Requirements for shielding are presented in the context of current astronaut exposure limits, natural ionizing radiation sources, and shielding inherent in a particular Mars vehicle configuration. An estimated range for shielding weight is presented based on the worst solar flare dose, mission duration, and inherent vehicle shielding.

  19. China forced to delay its maiden mission to Mars

    NASA Astrophysics Data System (ADS)

    Li, Jiao

    2009-11-01

    Scientists in China are urging the government to build its own capability to launch a craft to Mars after the county's first satellite to the red planet was delayed last month. China's mission to Mars, the Yinghuo-1 orbiter, was postponed after the Russian Space Agency, Roscosmos, announced that its Phobos-Grunt mission will now be launched in 2011.

  20. Evolving earth-based and in-situ satellite network architectures for Mars communications and navigation support

    NASA Technical Reports Server (NTRS)

    Hastrup, Rolf; Weinberg, Aaron; Mcomber, Robert

    1991-01-01

    Results of on-going studies to develop navigation/telecommunications network concepts to support future robotic and human missions to Mars are presented. The performance and connectivity improvements provided by the relay network will permit use of simpler, lower performance, and less costly telecom subsystems for the in-situ mission exploration elements. Orbiting relay satellites can serve as effective navigation aids by supporting earth-based tracking as well as providing Mars-centered radiometric data for mission elements approaching, in orbit, or on the surface of Mars. The relay satellite orbits may be selected to optimize navigation aid support and communication coverage for specific mission sets.

  1. Technology Needs for the Next Generation of NASA Science Missions

    NASA Technical Reports Server (NTRS)

    Anderson, David J.

    2013-01-01

    In-Space propulsion technologies relevant to Mars presentation is for the 14.03 Emerging Technologies for Mars Exploration panel. The talk will address propulsion technology needs for future Mars science missions, and will address electric propulsion, Earth entry vehicles, light weight propellant tanks, and the Mars ascent vehicle. The second panel presentation is Technology Needs for the Next Generation of NASA Science Missions. This talk is for 14.02 Technology Needs for the Next Generation of NASA Science Missions panel. The talk will summarize the technology needs identified in the NAC's Planetary Science Decadal Survey, and will set the stage for the talks for the 4 other panelist.

  2. Evolving earth-based and in-situ satellite network architectures for Mars communications and navigation support

    NASA Astrophysics Data System (ADS)

    Hastrup, Rolf; Weinberg, Aaron; McOmber, Robert

    1991-09-01

    Results of on-going studies to develop navigation/telecommunications network concepts to support future robotic and human missions to Mars are presented. The performance and connectivity improvements provided by the relay network will permit use of simpler, lower performance, and less costly telecom subsystems for the in-situ mission exploration elements. Orbiting relay satellites can serve as effective navigation aids by supporting earth-based tracking as well as providing Mars-centered radiometric data for mission elements approaching, in orbit, or on the surface of Mars. The relay satellite orbits may be selected to optimize navigation aid support and communication coverage for specific mission sets.

  3. Immersive Environments for Mission Operations: Beyond Mars Pathfinder

    NASA Technical Reports Server (NTRS)

    Wright, J.; Hartman, F.; Cooper, B.

    1998-01-01

    Immersive environments are just beginning to be used to support mission operations at the Jet Propulsion Laboratory. This technology contributed to the Mars Pathfinder Mission in planning sorties for the Sojourner rover.

  4. Effect of Departure Delays on Manned Mars Mission Selection

    NASA Technical Reports Server (NTRS)

    Desai, Prasun N.; Tartabini, Paul V.

    1995-01-01

    This study determines the effect on the initial mass in low Earth orbit (IMLEO) of delaying departure from Mars and Earth by 5, 15, and 30 days, once a nominal mission to Mars has been selected. Additionally, the use of a deep-space maneuver (DSM) is considered in order to alleviate the IMLEO penalties. Three different classes of missions are analyzed, using chemical and nuclear thermal propulsion systems in the 2000-2025 time frame: opposition, conjunction, and fast-transfer conjunction. The results indicate that Mars and Earth delays can lead to large IMLEO penalties. Opposition and fast-transfer conjunction-class missions have the highest IMLEO penalties, upwards of 432.4 and 1977.3 metric tons (mt), respectively. Conjunction-class missions, on the other hand, tend to be insensitive to Mars and Earth delays, having IMLEO penalties under 103.5 mt. As expected, nuclear thermal propulsion had significantly lower IMLEO penalties than chemical propulsion. The use of a DSM does not significantly reduce the penalties. The results of this study can enable mission designers to incorporate the influence of off-nominal departure conditions of the interplanetary trajectory in the overall conceptual design of a Mars transfer vehicle.

  5. Martian Chemical and Isotopic Reference Standards in Earth-based Laboratories — An Invitation for Geochemical, Astrobiological, and Engineering Dialog on Considering a Weathered Chondrite for Mars Sample Return.

    NASA Astrophysics Data System (ADS)

    Ashley, J. W.; Tait, A. W.; Velbel, M. A.; Boston, P. J.; Carrier, B. L.; Cohen, B. A.; Schröder, C.; Bland, P.

    2017-12-01

    Exogenic rocks (meteorites) found on Mars 1) have unweathered counterparts on Earth; 2) weather differently than indigenous rocks; and 3) may be ideal habitats for putative microorganisms and subsequent biosignature preservation. These attributes show the potential of meteorites for addressing hypothesis-driven science. They raise the question of whether chondritic meteorites, of sufficient weathering intensity, might be considered as candidates for sample return in a potential future mission. Pursuant to this discussion are the following questions. A) Is there anything to be learned from the laboratory study of a martian chondrite that cannot be learned from indigenous materials; and if so, B) is the science value high enough to justify recovery? If both A and B answer affirmatively, then C) what are the engineering constraints for sample collection for Mars 2020 and potential follow-on missions; and finally D) what is the likelihood of finding a favorable sample? Observations relevant to these questions include: i) Since 2005, 24 candidate and confirmed meteorites have been identified on Mars at three rover landing sites, demonstrating their ubiquity and setting expectations for future finds. All have been heavily altered by a variety of physical and chemical processes. While the majority of these are irons (not suitable for recovery), several are weathered stony meteorites. ii) Exogenic reference materials provide the only chemical/isotope standards on Mars, permitting quantification of alteration rates if residence ages can be attained; and possibly enabling the removal of Late Amazonian weathering overprints from other returned samples. iii) Recent studies have established the habitability of chondritic meteorites with terrestrial microorganisms, recommending their consideration when exploring astrobiological questions. High reactivity, organic content, and permeability show stony meteorites to be more attractive for colonization and subsequent biosignature preservation than Earth rocks. iv) Compressive strengths of most ordinary chondrites are within the range of rocks being tested for the Mars 2020 drill bits, provided that sufficient size, stability, and flatness of a target can be achieved. Alternatively, the regolith collection bit could be employed for unconsolidated material.

  6. Environmental Assurance Program for the Phoenix Mars Mission

    NASA Technical Reports Server (NTRS)

    Man, Kin F.; Natour, Maher C.; Hoffman, Alan R.

    2008-01-01

    The Phoenix Mars mission involves delivering a stationary science lander on to the surface of Mars in the polar region within the latitude band 65 deg N to 72 deg N. Its primary objective is to perform in-situ and remote sensing investigations that will characterize the chemistry of the materials at the local surface, subsurface, and atmosphere. The Phoenix spacecraft was launched on August 4, 2007 and will arrive at Mars in May 2008. The lander includes a suite of seven (7) science instruments. This mission is baselined for up to 90 sols (Martian days) of digging, sampling, and analysis. Operating at the Mars polar region creates a challenging environment for the Phoenix landed subsystems and instruments with Mars surface temperature extremes between -120 deg C to 25 deg C and diurnal thermal cycling in excess of 145 deg C. Some engineering and science hardware inside the lander were qualification tested up to 80 deg C to account for self heating. Furthermore, many of the hardware for this mission were inherited from earlier missions: the lander from the Mars Surveyor Program 2001 (MSP'01) and instruments from the MSP'01 and the Mars Polar Lander. Ensuring all the hardware was properly qualified and flight acceptance tested to meet the environments for this mission required defining and implementing an environmental assurance program that included a detailed heritage review coupled with tailored flight acceptance testing. A heritage review process with defined acceptance success criteria was developed and is presented in this paper together with the lessons learned in its implementation. This paper also provides a detailed description of the environmental assurance program of the Phoenix Mars mission. This program includes assembly/subsystem and system level testing in the areas of dynamics, thermal, and electromagnetic compatibility, as well as venting/pressure, dust, radiation, and meteoroid analyses to meet the challenging environment of this mission.

  7. A Mars orbiter mission design

    NASA Astrophysics Data System (ADS)

    Castronuovo, Marco M.

    1992-08-01

    A preliminary study of a new orbiter mission to Mars using an earth gravity assist is presented. The trajectory resulting from this study has been evaluated utilizing Everhart's (1985) integrator RADAU. The mission sequences are described and compared to other proposed mission designs and some mission opportunities for the years 1997 to 2014 are discussed.

  8. Mars Exploration Architecture

    NASA Technical Reports Server (NTRS)

    Jordan, James F.; Miller, Sylvia L.

    2000-01-01

    The architecture of NASA's program of robotic Mars exploration missions received an intense scrutiny during the summer months of 1998. We present here the results of that scrutiny, and describe a list of Mars exploration missions which are now being proposed by the nation's space agency. The heart of the new program architecture consists of missions which will return samples of Martian rocks and soil back to Earth for analysis. A primary scientific goal for these missions is to understand Mars as a possible abode of past or present life. The current level of sophistication for detecting markers of biological processes and fossil or extant life forms is much higher in Earth-based laboratories than possible with remotely deployed instrumentation, and will remain so for at least the next decade. Hence, bringing Martian samples back to Earth is considered the best way to search for the desired evidence. A Mars sample return mission takes approximately three years to complete. Transit from Earth to Mars requires almost a single year. After a lapse of time of almost a year at Mars, during which orbital and surface operations can take place, and the correct return launch energy constraints are met, a Mars-to-Earth return flight can be initiated. This return leg also takes approximately one year. Opportunities to launch these 3-year sample return missions occur about every 2 years. The figure depicts schedules for flights to and from Mars for Earth launches in 2003, 2005, 2007 and 2009. Transits for less than 180 deg flight angle, measured from the sun, and more than 180 deg are both shown.

  9. Mars Sample Return in the Context of the Mars Exploration Program

    NASA Astrophysics Data System (ADS)

    Garvin, J. B.

    2002-05-01

    The scientific priorities developed for the scientific exploration of Mars by the Mars Exploration Program Assessment Group [MEPAG, 2001] and as part of the Committee on Planetary and Lunar Exploration (COMPLEX) recent assessment of the NASA Mars Exploration Program [COMPLEX, 2001] all involve a campaign of Mars Sample Return (MSR) missions. Such MSR missions are required to address in a definitive manner most of the highest priority investigations within overarching science themes which include: (1) biological potential (past or present); (2) climate (past or present); (3) solid planet (surface and interior, past and present); (4) knowledge necessary to prepare for eventual human exploration of Mars. NASA's current Mars Exploration Program (MEP) contains specific flight mission developments and plans only for the present decade (2002-2010), including a cascade of missions designed to set the stage for an inevitable campaign of MSR missions sometime in the second decade (2011-2020). Studies are presently underway to examine implementation options for a first MSR mission in which at least 500g of martian materials (including lithic fragments) would be returned to Earth from a landing vicinity carefully selected on the basis of the comprehensive orbital and surface-based remote sensing campaign that is ongoing (MGS, ODYSSEY) and planned (MER, MRO, 2009 MSL). Key to the first of several MSR's is attention to risk, cost, and enabling technologies that facilitate access to most scientifically-compelling martian materials at very local scales. The context for MSR's in the upcoming decade remains a vital part of NASA's scientific strategy for Mars exploration.

  10. Network science landers for Mars

    NASA Astrophysics Data System (ADS)

    Harri, A.-M.; Marsal, O.; Lognonne, P.; Leppelmeier, G. W.; Spohn, T.; Glassmeier, K.-H.; Angrilli, F.; Banerdt, W. B.; Barriot, J. P.; Bertaux, J.-L.; Berthelier, J. J.; Calcutt, S.; Cerisier, J. C.; Crisp, D.; Dehant, V.; Giardini, D.; Jaumann, R.; Langevin, Y.; Menvielle, M.; Musmann, G.; Pommereau, J. P.; di Pippo, S.; Guerrier, D.; Kumpulainen, K.; Larsen, S.; Mocquet, A.; Polkko, J.; Runavot, J.; Schumacher, W.; Siili, T.; Simola, J.; Tillman, J. E.

    1999-01-01

    The NetLander Mission will deploy four landers to the Martian surface. Each lander includes a network science payload with instrumentation for studying the interior of Mars, the atmosphere and the subsurface, as well as the ionospheric structure and geodesy. The NetLander Mission is the first planetary mission focusing on investigations of the interior of the planet and the large-scale circulation of the atmosphere. A broad consortium of national space agencies and research laboratories will implement the mission. It is managed by CNES (the French Space Agency), with other major players being FMI (the Finnish Meteorological Institute), DLR (the German Space Agency), and other research institutes. According to current plans, the NetLander Mission will be launched in 2005 by means of an Ariane V launch, together with the Mars Sample Return mission. The landers will be separated from the spacecraft and targeted to their locations on the Martian surface several days prior to the spacecraft's arrival at Mars. The landing system employs parachutes and airbags. During the baseline mission of one Martian year, the network payloads will conduct simultaneous seismological, atmospheric, magnetic, ionospheric, geodetic measurements and ground penetrating radar mapping supported by panoramic images. The payloads also include entry phase measurements of the atmospheric vertical structure. The scientific data could be combined with simultaneous observations of the atmosphere and surface of Mars by the Mars Express Orbiter that is expected to be functional during the NetLander Mission's operational phase. Communication between the landers and the Earth would take place via a data relay onboard the Mars Express Orbiter.

  11. In-Space Transportation for NASA's Evolvable Mars Campaign

    NASA Technical Reports Server (NTRS)

    Percy, Thomas K.; McGuire, Melissa; Polsgrove, Tara

    2015-01-01

    As the nation embarks on a new and bold journey to Mars, significant work is being done to determine what that mission and those architectural elements will look like. The Evolvable Mars Campaign, or EMC, is being evaluated as a potential approach to getting humans to Mars. Built on the premise of leveraging current technology investments and maximizing element commonality to reduce cost and development schedule, the EMC transportation architecture is focused on developing the elements required to move crew and equipment to Mars as efficiently and effectively as possible both from a performance and a programmatic standpoint. Over the last 18 months the team has been evaluating potential options for those transportation elements. One of the key aspects of the EMC is leveraging investments being made today in missions like the Asteroid Redirect Mission (ARM) mission using derived versions of the Solar Electric Propulsion (SEP) propulsion systems and coupling them with other chemical propulsion elements that maximize commonality across the architecture between both transportation and Mars operations elements. This paper outlines the broad trade space being evaluated including the different technologies being assessed for transportation elements and how those elements are assembled into an architecture. Impacts to potential operational scenarios at Mars are also investigated. Trades are being made on the size and power level of the SEP vehicle for delivering cargo as well as the size of the chemical propulsion systems and various mission aspects including Inspace assembly and sequencing. Maximizing payload delivery to Mars with the SEP vehicle will better support the operational scenarios at Mars by enabling the delivery of landers and habitation elements that are appropriately sized for the mission. The purpose of this investigation is not to find the solution but rather a suite of solutions with potential application to the challenge of sending cargo and crew to Mars. The goal is that, by building an architecture intelligently with all aspects considered, the sustainable Mars program wisely invests limited resources enabling a long-term human Mars exploration program.

  12. MEDA, The New Instrument for Mars Environment Analysis for the Mars 2020 Mission

    NASA Astrophysics Data System (ADS)

    Moreno-Alvarez, Jose F.; Pena-Godino, Antonio; Rodriguez-Manfredi, Jose Antonio; Cordoba, Elizabeth; MEDA Team

    2016-08-01

    The Mars 2020 rover mission is part of NASA's Mars Exploration Program, a long-term effort of robotic exploration of the red planet. Designed to advance high-priority science goals for Mars exploration, the mission will address key questions about the potential for life on Mars. The mission will also provide opportunities to gather knowledge and demonstrate technologies that address the challenges of future human expeditions to Mars.The Mars Environmental Dynamics Analyzer (MEDA) is an integrated full suite of sensors designed to address the Mars 2020 mission objectives of characterization of dust size and morphology and surface weather measurements.MEDA system consists of one control unit and 10 separated sensor enclosures distributed in different positions along the Mars 2020 rover. MEDA is composed of an ARM-based control computer with its flight software application, two wind sensors including mixed ASICs inside, five air temperature sensors, one sky pointing camera complemented with 16 photo- detectors looking up and around, one thermal infrared sensor using five measurement bands, one relative humidity sensor, one pressure sensor and the harness that interconnects all of them. It is a complex system intended to operate in one of the harshest environments possible, the Mars surface, for many years to come.This will become a short term reality thanks to the combination of a strong international science team driving the science and system requirements working together with a powerful industrial organization to design and build the instrument. The instrument is being built right now, with its Critical Design Review at the end of 2016, and the flight model to be provided in 2018.This paper summarizes the main scientific objective of the MEDA instrument, the links between the Mission and the MEDA science objectives, and the challenging environmental Mars requirements. It will then focus on the engineered definition of the instrument, showing the overall architecture of the instrument and its sensors, including a discussion of the heritage from REMS.

  13. Mars Relay Satellite: Key to Enabling Low-Cost Exploration Missions

    NASA Technical Reports Server (NTRS)

    Hastrup, R.; Cesarone, R.; Miller, A.

    1993-01-01

    Recently, there has been increasing evidence of a renewed focus on Mars exploration both by NASA and the international community. The thrust of this renewed interest appears to be manifesting itself in numerous low-cost missions employing small, light weight elements, which utilize advanced technologies including integrated microelectronics. A formidable problem facing these low-cost missions is communications with Earth. Providing adequate direct-link performance has very significant impacts on spacecraft power, pointing, mass and overall complexity. Additionally, for elements at or near the surface of Mars, there are serious connectivity constraints, especially at higher latitudes, which lose view of Earth for up to many months at a time. This paper will discuss the role a Mars relay satellite can play in enabling and enhancing low-cost missions to Mars...

  14. An independent assessment of the technical feasibility of the Mars One mission plan - Updated analysis

    NASA Astrophysics Data System (ADS)

    Do, Sydney; Owens, Andrew; Ho, Koki; Schreiner, Samuel; de Weck, Olivier

    2016-03-01

    In recent years, the Mars One program has gained significant publicity for its plans to colonize the red planet. Beginning in 2025, the program plans to land four people on Mars every 26 months via a series of one-way missions, using exclusively existing technology. This one-way approach has frequently been cited as a key enabler of accelerating the first crewed landing on Mars. While the Mars One program has received considerable attention, little has been published in the technical literature regarding the formulation of its mission architecture. In light of this, we perform an independent analysis of the technical feasibility of the Mars One mission plan, focusing on the architecture of the life support and in-situ resource utilization (ISRU) systems, and their impact on sparing and space logistics. To perform this analysis, we adopt an iterative analysis approach in which we model and simulate the mission architecture, assess its feasibility, implement any applicable modifications while attempting to remain within the constraints set forth by Mars One, and then resimulate and reanalyze the revised version of the mission architecture. Where required information regarding the Mars One mission architecture is not available, we assume numerical values derived from standard spaceflight design handbooks and documents. Through four iterations of this process, our analysis finds that the Mars One mission plan, as publicly described, is not feasible. This conclusion is obtained from analyses based on mission assumptions derived from and constrained by statements made by Mars One, and is the result of the following findings: (1) several technologies including ISRU, life support, and entry, descent, and landing (EDL) are not currently "existing, validated and available" as claimed by Mars One; (2) the crop growth area described by Mars One is insufficient to feed their crew; (3) increasing the crop growth area to provide sufficient food for the crew leads to atmospheric imbalances that requires a prohibitively large ISRU atmospheric processor or a notably different system architecture to manage; and (4) at least 13 Falcon Heavy launches are needed to deliver a portion of the required equipment to the Martian surface, a value that is at least double that planned by Mars One for the same mission phase. Most importantly, we find that the one-way nature of the Mars One mission, coupled with its plans to increase its crew population every 26 months, causes the operating costs of the program to grow continually over time. This is due to the fact that maintaining a growing colony on the Martian surface incurs increasing equipment and spare parts resupply requirements and hence launch costs over time. Based on published launch vehicle and lander estimates, our analysis finds that by the launch of the fifth crew, the cost associated with launching a portion of all required equipment and spares is approximately equal to half of the total NASA FY2015 budget - and this cost will grow when other critical systems outside the scope of this analysis are included. To mitigate these costs and bring the plan closer towards feasibility, we recommend a number of mission architecture modifications and technology development efforts be implemented before the initiation of any Mars settlement campaign. These include the further development of EDL, life support, and ISRU technologies, as well as additive manufacturing technology that utilizes ISRU-derived Martian feedstock as a potential means to address the growing cost of resupply.

  15. JPL VLBI Analysis Center Report for 2012

    NASA Technical Reports Server (NTRS)

    Jacobs, Chris

    2013-01-01

    This report describes the activities of the JPL VLBI Analysis Center for the year 2012. The highlight of the year was the successful MSL rover Mars landing, which was supported by VLBI-based navigation using our combined spacecraft, celestial reference frame, terrestrial reference frame, earth orientation, and planetary ephemeris VLBI systems. We also supported several other missions with VLBI navigation measurements. A combined NASA-ESA network was demonstrated with first Ka-band fringes to ESA's Malargue, Argentina 35 m. We achieved first fringes with our new digital back end and Mark 5C recorders.

  16. Landing Sites for a Mars Sample Return Mission in Arabia Terra

    NASA Astrophysics Data System (ADS)

    Salese, F.; Pondrelli, M.; Schmidt, G. W.; Mitri, G.; Pacifici, A.; Cavalazzi, B.; Ori, G. G.; Glamoclija, M.; Hauber, E.; Le Deit, L.; Marinangeli, L.; Rossi, A. P.

    2018-04-01

    We are characterizing the geology of several areas in Arabia Terra as possible Mars Sample Return mission landing sites. Arabia Terra presents several interesting sites regarding the search for past traces of life on Mars.

  17. Life sciences and Mars exploration

    NASA Technical Reports Server (NTRS)

    Sulzman, Frank M.; Rummel, John D.; Leveton, Lauren B.; Teeter, Ron

    1990-01-01

    The major life science considerations for Mars exploration missions are discussed. Radiation protection and countermeasures for zero gravity are discussed. Considerations of crew psychological health considerations and life support systems are addressed. Scientific opportunities presented by manned Mars missions are examined.

  18. Mars Methane Analogue Mission (M3): Analytical Techniques and Operations

    NASA Astrophysics Data System (ADS)

    Cloutis, E.; Vrionis, H.; Qadi, A.; Bell, J. F.; Berard, G.; Boivin, A.; Ellery, A.; Jamroz, W.; Kruzelecky, R.; Mann, P.; Samson, C.; Stromberg, J.; Strong, K.; Tremblay, A.; Whyte, L.; Wing, B.

    2011-03-01

    The Mars Methane Analogue Mission (M3) project is designed to simulate a rover-based search for, and analysis of, methane sources on Mars at a serpentinite open pit mine in Quebec, using a variety of instruments.

  19. Color Camera for Curiosity Robotic Arm

    NASA Image and Video Library

    2010-11-16

    The Mars Hand Lens Imager MAHLI camera will fly on NASA Mars Science Laboratory mission, launching in late 2011. This photo of the camera was taken before MAHLI November 2010 installation onto the robotic arm of the mission Mars rover, Curiosity.

  20. Exomars Mission Verification Approach

    NASA Astrophysics Data System (ADS)

    Cassi, Carlo; Gilardi, Franco; Bethge, Boris

    According to the long-term cooperation plan established by ESA and NASA in June 2009, the ExoMars project now consists of two missions: A first mission will be launched in 2016 under ESA lead, with the objectives to demonstrate the European capability to safely land a surface package on Mars, to perform Mars Atmosphere investigation, and to provide communi-cation capability for present and future ESA/NASA missions. For this mission ESA provides a spacecraft-composite, made up of an "Entry Descent & Landing Demonstrator Module (EDM)" and a Mars Orbiter Module (OM), NASA provides the Launch Vehicle and the scientific in-struments located on the Orbiter for Mars atmosphere characterisation. A second mission with it launch foreseen in 2018 is lead by NASA, who provides spacecraft and launcher, the EDL system, and a rover. ESA contributes the ExoMars Rover Module (RM) to provide surface mobility. It includes a drill system allowing drilling down to 2 meter, collecting samples and to investigate them for signs of past and present life with exobiological experiments, and to investigate the Mars water/geochemical environment, In this scenario Thales Alenia Space Italia as ESA Prime industrial contractor is in charge of the design, manufacturing, integration and verification of the ESA ExoMars modules, i.e.: the Spacecraft Composite (OM + EDM) for the 2016 mission, the RM for the 2018 mission and the Rover Operations Control Centre, which will be located at Altec-Turin (Italy). The verification process of the above products is quite complex and will include some pecu-liarities with limited or no heritage in Europe. Furthermore the verification approach has to be optimised to allow full verification despite significant schedule and budget constraints. The paper presents the verification philosophy tailored for the ExoMars mission in line with the above considerations, starting from the model philosophy, showing the verification activities flow and the sharing of tests between the different levels (system, modules, subsystems, etc) and giving an overview of the main test defined at Spacecraft level. The paper is mainly focused on the verification aspects of the EDL Demonstrator Module and the Rover Module, for which an intense testing activity without previous heritage in Europe is foreseen. In particular the Descent Module has to survive to the Mars atmospheric entry and landing, its surface platform has to stay operational for 8 sols on Martian surface, transmitting scientific data to the Orbiter. The Rover Module has to perform 180 sols mission in Mars surface environment. These operative conditions cannot be verified only by analysis; consequently a test campaign is defined including mechanical tests to simulate the entry loads, thermal test in Mars environment and the simulation of Rover operations on a 'Mars like' terrain. Finally, the paper present an overview of the documentation flow defined to ensure the correct translation of the mission requirements in verification activities (test, analysis, review of design) until the final verification close-out of the above requirements with the final verification reports.

  1. Evaluating Mars Science Laboratory Landing Sites with the Mars Global Reference Atmospheric Model (Mars-GRAM 2005)

    NASA Technical Reports Server (NTRS)

    Justh, H. L.; Justus, C. G.

    2008-01-01

    The Mars Global Reference Atmospheric Model (Mars-GRAM) is an engineering-level atmospheric model widely used for diverse mission applications. Mars-GRAM s perturbation modeling capability is commonly used, in a Monte-Carlo mode, to perform high fidelity engineering end-to-end simulations for entry, descent, and landing (EDL) [1]. From the surface to 80 km altitude, Mars-GRAM is based on the NASA Ames Mars General Circulation Model (MGCM). Mars-GRAM and MGCM use surface topography from Mars Global Surveyor Mars Orbiter Laser Altimeter (MOLA), with altitudes referenced to the MOLA areoid, or constant potential surface. Traditional Mars-GRAM options for representing the mean atmosphere along entry corridors include: (1) Thermal Emission Spectrometer (TES) mapping years 1 and 2, with Mars-GRAM data coming from NASA Ames Mars General Circulation Model (MGCM) results driven by observed TES dust optical depth or (2) TES mapping year 0, with user-controlled dust optical depth and Mars-GRAM data interpolated from MGCM model results driven by selected values of globally-uniform dust optical depth. Mars-GRAM 2005 has been validated [2] against Radio Science data, and both nadir and limb data from TES [3]. There are several new features included in Mars-GRAM 2005. The first is the option to use input data sets from MGCM model runs that were designed to closely simulate conditions observed during the first two years of TES observations at Mars. The TES Year 1 option includes values from April 1999 through January 2001. The TES Year 2 option includes values from February 2001 through December 2002. The second new feature is the option to read and use any auxiliary profile of temperature and density versus altitude. In exercising the auxiliary profile Mars-GRAM option, values from the auxiliary profile replace data from the original MGCM databases. Some examples of auxiliary profiles include data from TES nadir or limb observations and Mars mesoscale model output at a particular location and time. The final new feature is the addition of two Mars-GRAM parameters that allow standard deviations of Mars-GRAM perturbations to be adjusted. The parameter rpscale can be used to scale density perturbations up or down while rwscale can be used to scale wind perturbations.

  2. Effects of simulated space radiation on immunoassay components for life-detection experiments in planetary exploration missions.

    PubMed

    Derveni, Mariliza; Hands, Alex; Allen, Marjorie; Sims, Mark R; Cullen, David C

    2012-08-01

    The Life Marker Chip (LMC) instrument is part of the proposed payload on the ESA ExoMars rover that is scheduled for launch in 2018. The LMC will use antibody-based assays to detect molecular signatures of life in samples obtained from the shallow subsurface of Mars. For the LMC antibodies, the ability to resist inactivation due to space particle radiation (both in transit and on the surface of Mars) will therefore be a prerequisite. The proton and neutron components of the mission radiation environment are those that are expected to have the dominant effect on the operation of the LMC. Modeling of the radiation environment for a mission to Mars led to the calculation of nominal mission fluences for proton and neutron radiation. Various combinations and multiples of these values were used to demonstrate the effects of radiation on antibody activity, primarily at the radiation levels envisaged for the ExoMars mission as well as at much higher levels. Five antibodies were freeze-dried in a variety of protective molecular matrices and were exposed to various radiation conditions generated at a cyclotron facility. After exposure, the antibodies' ability to bind to their respective antigens was assessed and found to be unaffected by ExoMars mission level radiation doses. These experiments indicated that the expected radiation environment of a Mars mission does not pose a significant risk to antibodies packaged in the form anticipated for the LMC instrument.

  3. AutoGen Version 5.0

    NASA Technical Reports Server (NTRS)

    Gladden, Roy E.; Khanampornpan, Teerapat; Fisher, Forest W.

    2010-01-01

    Version 5.0 of the AutoGen software has been released. Previous versions, variously denoted Autogen and autogen, were reported in two articles: Automated Sequence Generation Process and Software (NPO-30746), Software Tech Briefs (Special Supplement to NASA Tech Briefs), September 2007, page 30, and Autogen Version 2.0 (NPO- 41501), NASA Tech Briefs, Vol. 31, No. 10 (October 2007), page 58. To recapitulate: AutoGen (now signifying automatic sequence generation ) automates the generation of sequences of commands in a standard format for uplink to spacecraft. AutoGen requires fewer workers than are needed for older manual sequence-generation processes, and greatly reduces sequence-generation times. The sequences are embodied in spacecraft activity sequence files (SASFs). AutoGen automates generation of SASFs by use of another previously reported program called APGEN. AutoGen encodes knowledge of different mission phases and of how the resultant commands must differ among the phases. AutoGen also provides means for customizing sequences through use of configuration files. The approach followed in developing AutoGen has involved encoding the behaviors of a system into a model and encoding algorithms for context-sensitive customizations of the modeled behaviors. This version of AutoGen addressed the MRO (Mars Reconnaissance Orbiter) primary science phase (PSP) mission phase. On previous Mars missions this phase has more commonly been referred to as mapping phase. This version addressed the unique aspects of sequencing orbital operations and specifically the mission specific adaptation of orbital operations for MRO. This version also includes capabilities for MRO s role in Mars relay support for UHF relay communications with the MER rovers and the Phoenix lander.

  4. The Importance of Contamination Knowledge in Curation - Insights into Mars Sample Return

    NASA Technical Reports Server (NTRS)

    Harrington, A. D.; Calaway, M. J.; Regberg, A. B.; Mitchell, J. L.; Fries, M. D.; Zeigler, R. A.; McCubbin, F. M.

    2018-01-01

    The Astromaterials Acquisition and Curation Office at NASA Johnson Space Center (JSC), in Houston, TX (henceforth Curation Office) manages the curation of extraterrestrial samples returned by NASA missions and shared collections from international partners, preserving their integrity for future scientific study while providing the samples to the international community in a fair and unbiased way. The Curation Office also curates flight and non-flight reference materials and other materials from spacecraft assembly (e.g., lubricants, paints and gases) of sample return missions that would have the potential to cross-contaminate a present or future NASA astromaterials collection.

  5. Systems analysis of Mars solar electric propulsion vehicles

    NASA Technical Reports Server (NTRS)

    Hickman, J. M.; Curtis, H. B.; Kenny, B. H.; Sefcik, R. J.

    1990-01-01

    Mission performance, mass, initial power, and cost are determined for solar electric propulsion vehicles across a range of payload masses, reference powers, and mission trajectories. Thick radiation shielding is added to arrays using indium phosphide or III-V multijunction solar cells to reduce the damage incurred through the radiation belts. Special assessments of power management and distribution systems, atmospheric drag, and energy storage are made. It is determined that atmospheric drag is of no great concern and that the energy storage used in countering drag is unnecessary. A scheme to package the arrays, masts, and ion thrusters into a single fairing is presented.

  6. Space Transportation Infrastructure Supported By Propellant Depots

    NASA Technical Reports Server (NTRS)

    Smitherman, David; Woodcock, Gordon

    2011-01-01

    A space transportation infrastructure is described that utilizes propellant depots to support all foreseeable missions in the Earth-Moon vicinity and deep space out to Mars. The infrastructure utilizes current expendable launch vehicles such as the Delta IV Heavy, Atlas V, and Falcon 9, for all crew, cargo, and propellant launches to orbit. Propellant launches are made to a Low-Earth-Orbit (LEO) Depot and an Earth-Moon Lagrange Point 1 (L1) Depot to support new reusable in-space transportation vehicles. The LEO Depot supports missions to Geosynchronous Earth Orbit (GEO) for satellite servicing, and to L1 for L1 Depot missions. The L1 Depot supports Lunar, Earth-Sun L2 (ESL2), Asteroid, and Mars missions. A Mars Orbital Depot is also described to support ongoing Mars missions. New concepts for vehicle designs are presented that can be launched on current 5-meter diameter expendable launch vehicles. These new reusable vehicle concepts include a LEO Depot, L1 Depot, and Mars Orbital Depot based on International Space Station (ISS) heritage hardware. The high-energy depots at L1 and Mars orbit are compatible with, but do not require, electric propulsion tug use for propellant and/or cargo delivery. New reusable in-space crew transportation vehicles include a Crew Transfer Vehicle (CTV) for crew transportation between the LEO Depot and the L1 Depot, a new reusable Lunar Lander for crew transportation between the L1 Depot and the lunar surface, and a Deep Space Habitat (DSH) to support crew missions from the L1 Depot to ESL2, Asteroid, and Mars destinations. A 6 meter diameter Mars lander concept is presented that can be launched without a fairing based on the Delta IV heavy Payload Planners Guide, which indicates feasibility of a 6.5 meter fairing. This lander would evolve to re-usable operations when propellant production is established on Mars. Figure 1 provides a summary of the possible missions this infrastructure can support. Summary mission profiles are presented for each primary mission capability. These profiles are the basis for propellant loads, numbers of vehicles/stages and launches for each mission capability. Data includes the number of launches required for each mission utilizing current expendable launch vehicle systems, and concluding remarks include ideas for reducing the number of launches through incorporation of heavy-lift launch vehicles, solar electric propulsion, and other transportation support concepts.

  7. Manned Mars mission communication and data management systems

    NASA Technical Reports Server (NTRS)

    White, Ronald E.

    1986-01-01

    A manned Mars mission will involve a small crew and many complex tasks. The productivity of the crew and the entire mission will depend significantly on effective automation of these tasks and the ease with which the crew can interface with them. The technology to support a manned Mars mission is available today; however, evolving software and electronic technology are enabling many interesting possibilities for increasing productivity and safety while reducing life cycle cost. Some of these advanced technologies are identified.

  8. Launch and Assembly Reliability Analysis for Mars Human Space Exploration Missions

    NASA Technical Reports Server (NTRS)

    Cates, Grant R.; Stromgren, Chel; Cirillo, William M.; Goodliff, Kandyce E.

    2013-01-01

    NASA s long-range goal is focused upon human exploration of Mars. Missions to Mars will require campaigns of multiple launches to assemble Mars Transfer Vehicles in Earth orbit. Launch campaigns are subject to delays, launch vehicles can fail to place their payloads into the required orbit, and spacecraft may fail during the assembly process or while loitering prior to the Trans-Mars Injection (TMI) burn. Additionally, missions to Mars have constrained departure windows lasting approximately sixty days that repeat approximately every two years. Ensuring high reliability of launching and assembling all required elements in time to support the TMI window will be a key enabler to mission success. This paper describes an integrated methodology for analyzing and improving the reliability of the launch and assembly campaign phase. A discrete event simulation involves several pertinent risk factors including, but not limited to: manufacturing completion; transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to TMI. The model accommodates varying numbers of launches, including the potential for spare launches. Having a spare launch capability provides significant improvement to mission success.

  9. Natural radiation hazards on the manned Mars mission

    NASA Technical Reports Server (NTRS)

    Letaw, John R.; Silberberg, Rein; Tsao, C. H.

    1986-01-01

    The hazards of the natural radiation environment (cosmic rays and solar energetic particles) on a manned mission to Mars are considered. These hazards are addressed in three different settings: the flight to Mars where the astronauts are shielded only by the spacecraft; on the surface of Mars under an atmosphere of about 10 g/sq cm carbon dioxide; and under the surface of Mars where additional shielding would result.

  10. The supercam instrument on the NASA Mars 2020 mission: optical design and performance

    NASA Astrophysics Data System (ADS)

    Perez, R.; Parès, Laurent P.; Newell, R.; Robinson, S.; Bernardi, P.; Réess, J.-M.; Caïs, Ph.; McCabe, K.; Maurice, S.; Wiens, R. C.

    2017-09-01

    NASA is developing the MARS 2020 mission, which includes a rover that will land and operate on the surface of Mars. MARS 2020, scheduled for launch in July, 2020, is designed to conduct an assessment of Mars' past habitability, search for potential biosignatures, demonstrate progress toward the future return of samples to Earth, and contribute to NASA's Human Exploration and Space Technology Programs.

  11. Design of a fast crew transfer vehicle to Mars

    NASA Technical Reports Server (NTRS)

    1988-01-01

    A final report is made on the trajectory and vehicle requirements for a fast crew transfer vehicle to Mars which will complete an Earth to Mars (and Mars to Earth) transfer in 150 days and will have a stay time at Mars of 40 days. This vehicle will maximize the crew's effectiveness on Mars by minimizing detrimental physiological effects such as bone demineralization and loss of muscle tone caused by long period exposure to zero gravity and radiation from cosmic rays and solar flares. The crew transfer vehicle discussed will complete the second half of a Split Mission to Mars. In the Split Mission, a slow, unmanned cargo vehicle, nicknamed the Barge, is sent to Mars ahead of the crew vehicle. Once the Barge is in orbit around Mars, the fast crew vehicle will be launched to rendezvous with the Barge in Mars orbit. The vehicle presented is designed to carry six astronauts for a mission duration of one year. The vehicle uses a chemical propulsion system and a nuclear power system. Four crew modules, similar to the proposed Space Station Common Modules, are used to house the crew and support equipment during the mission. The final design also includes a command module that is shielded to protect the crew during radiation events.

  12. Mars Drilling Status

    NASA Technical Reports Server (NTRS)

    Mandell, Humboldt, C., Jr.

    2002-01-01

    This slide presentation reviews the current status of work to explore Mars beneath the surface of planet. One of the objective of this work is to enable further exploration of Mars by humans. One of the requirements for this is to find water on Mars. The presences of water is critical for Human Exploration and a permanent presence on Mars. If water is present beneath the surface it is the best chance of finding life on Mars. The presentation includes a timeline showing the robotic missions, those that have already been on Mars, and planned missions, an explanation of why do we want to drill on Mars, and some of the challenges, Also include are reviews of a missions that would drill 200 and 4,000 to 6,000 meters into the Martian bedrock, and a overview description of the drill. There is a view of some places where we have hopes of finding water.

  13. Aerobrake concepts for NTP systems study

    NASA Technical Reports Server (NTRS)

    Cruz, Manuel I.

    1992-01-01

    Design concepts are described for landing large spacecraft masses on the Mars surface in support of manned missions with interplanetary transportation using Nuclear Thermal Propulsion (NTP). Included are the mission and systems analyses, trade studies and sensitivity analyses, design analyses, technology assessment, and derived requirements to support this concept. The mission phases include the Mars de-orbit, entry, terminal descent, and terminal touchdown. The study focuses primarily on Mars surface delivery from orbit after Mars orbit insertion using an NTP. The requirements associated with delivery of logistical supplies, habitats, and other equipment on minimum energy Earth to Mars transfers are also addressed in a preliminary fashion.

  14. Mars-GRAM 2010: Additions and Resulting Improvements

    NASA Technical Reports Server (NTRS)

    Justh, Hilary L.; Burns, K. Lee

    2013-01-01

    The Mars Global Reference Atmospheric Model (Mars-GRAM) is an engineering-level atmospheric model widely used for diverse mission applications. Mars-GRAM has been utilized during previous aerobraking operations in the atmosphere of Mars. Mars-GRAM has also been used in the prediction and validation of Mars Pathfinder hypersonic aerodynamics, the aerothermodynamic and entry dynamics studies for Mars Polar Lander, the landing site selection process for the Mars Science Laboratory (MSL), the Mars Aerocapture System Study (MASS) as well as the Aerocapture Technology Assessment Group (TAG). Most recently, Mars-GRAM 2010 was used to develop the onboard atmospheric density estimator that is part of the Autonomous Aerobraking Development Plan. The most recent release of Mars-GRAM 2010 contains several changes including an update to Fortran 90/95 and the addition of adjustment factors. Following the completion of a comparison analysis between Mars-GRAM, Thermal Emission Spectrometer (TES), as well as Mars Global Surveyor (MGS), Mars Odyssey (ODY), and Mars Reconnaissance Orbiter (MRO) aerobraking density data, adjustment factors were added to Mars-GRAM 2010 that alter the input data from National Aeronautics and Space Administration (NASA) Ames Mars General Circulation Model (MGCM) and the University of Michigan Mars Thermospheric General Circulation Model (MTGCM) for the mapping year 0 user-controlled dust case. The addition of adjustment factors resolved the issue of previous versions of Mars-GRAM being less than realistic when used for sensitivity studies for mapping year 0 and large optical depth values, such as tau equal to 3. Mars-GRAM was evaluated at locations and times of TES limb observations and adjustment factors were determined. For altitudes above 80 km and below 135 km, Mars-GRAM (MTGCM) densities were compared to aerobraking densities measured by Mars Global Surveyor (MGS), Mars Odyssey (ODY), and Mars Reconnaissance Orbiter (MRO) to determine the adjustment factors. The adjustment factors generated by this process had to satisfy the gas law as well as the hydrostatic relation and are expressed as a function of height (z), Latitude (Lat) and areocentric solar longitude (Ls). The greatest adjustments are made at large optical depths such as tau greater than 1. The addition of the adjustment factors has led to better correspondence to TES Limb data from 0-60 km altitude as well as better agreement with MGS, ODY and MRO data at approximately 90-130 km altitude. Improved Mars-GRAM atmospheric simulations for various locations, times and dust conditions on Mars will be presented at the workshop session. The latest results validating Mars-GRAM 2010 versus Mars Climate Sounder data will also be presented. Mars-GRAM 2010 updates have resulted in improved atmospheric simulations which will be very important when beginning systems design, performance analysis, and operations planning for future aerocapture, aerobraking or landed missions to Mars.

  15. Sample Collection for Investigation of Mars (SCIM): An Early Mars Sample Return Mission Through the Mars Scout Program

    NASA Technical Reports Server (NTRS)

    Leshin, L. A.; Yen, A.; Bomba, J.; Clark, B.; Epp, C.; Forney, L.; Gamber, T.; Graves, C.; Hupp, J.; Jones, S.

    2002-01-01

    The Sample Collection for Investigation of Mars (SCIM) mission is designed to: (1) make a 40 km pass through the Martian atmosphere; (2) collect dust and atmospheric gas; and (3) return the samples to Earth for analysis. Additional information is contained in the original extended abstract.

  16. On Adopting a Proactive Approach to the Disposition of Mars Orbiters

    NASA Astrophysics Data System (ADS)

    Rummel, John; Shotwell, Robert; Price, Hoppy

    2016-07-01

    There are currently three U.S. orbiters at Mars plus two orbiters from other nations. At the end of each mission, it is desirable to dispose of the vehicle in a condition where it would present no hazard to other orbiters and to potential future crewed vehicles, while meeting planetary protection constraints. There is currently no way to accurately track and confirm positions of these orbiters after they are no longer being actively tracked from Earth, and due to the extremely "bumpy" nature of the Martian gravity field the position of these vehicles rapidly becomes unknowable . The current COSPAR Planetary Protection Policy for Mars includes a throwback to an earlier era of planetary exploration. The Policy's provisions for the disposition of Mars orbiters includes an option "to meet orbital lifetime requirements" of 20 years (at 99% probability) and 50 years (at 95% probability) after launch (which we will call option 1), or option 2, requiring total (surface, mated, and encapsulated) bioburden levels of ≤ 5 x 10 ^{5} spores - which may be discounted by the number of spores thought to be destroyed during the eventual deorbit of the spacecraft. Reference to DeVincenzi et al (1996) illustrates that the current orbital lifetime requirements in option 1 are directly tied to the notion of a "period of exploration," rather than to any explicit expectation of bioload reduction. Under the current regime, all orbiters comply with option 1, orbital lifetime, or option 2, prior to launch, which generally includes an approved bioburden reduction program prior to launch. As part of option 2, a break up/burn up analysis is also performed, covering the event of an uncontrolled re-entry at arrival or during the orbital mission itself. It has been suggested that we should be seeing an increasing tempo of Mars operations, with an emphasis on making maximum use of communications orbiters in particular. It can be shown that for many orbiters, deorbiting can take quite a bit less delta-V than orbit raising (e.g., to >500 km) to extend their lifetime, so deorbiting (with an attendant focus on increasing burnup and breakup to limit microbial contamination) could provide for possibly years more relay support, as well as a more explicit step for bioburden reduction. Deorbiting can also provide for a more positive termination, eliminates future risk of orbital debris generation around Mars, and ends the possibility of re-entering in an uncontrolled fashion and uncontrolled location later. This paper lays out the issues and options associated with an emphasis on option 2 as the preferred orbiter disposal strategy for Category III missions to Mars. The expectation is that valuable orbits can be better protected for future explorers, and that controls over the contamination of Mars by orbiters can be improved if COSPAR adopts this re-emphasis on behalf of the agencies which are now planning future missions to Mar. Ref. DeVincenzi, D. L., P. D. Stabekis, and J. Barengoltz, Refinement of planetary protection policy for Mars missions, Adv. Space Res. 18: 311-316, 1996.

  17. Access to enterntainment and information programming for the crew as part of the communication system of future Mars mission or Lunar Base

    NASA Astrophysics Data System (ADS)

    Hargitai, H.

    In recent years the improtance of the psychologic conditions of the cure of a long- term Mars expedition (or a Lunar Base) is becoming a crucial factor concerning the success of such mission. The 500-day stay on Mars will be the longest planetary surface exploration opportunity ever experienced. [1] Manned planetary missions so far had no such long term isolation from the our cultural environment (or "bubble"), and cosmo - and astronauts consumed mostly recorded materials for enterntainment which will not be sufficent for such mission. The closest analogy for such a long-term isolation of a relatively small group of people is the situation at military bases or the American (or other) pioneer settlers. Both American and British Army uses an extensive enternatinment and information media network - both radio and TV - which provides programs for their personell in places which are out of the reach of their home media services but usually inside an other cultural environment. For a mission with a long duration (months or years), where the crew is absolutely cut off from Earth media and news (incl. politics, culture, music etc), especially for the flight time, it is important to create a special "buquet" of programs that keeps the crew inside the Earth cultural environment. In this paper I will discuss the technical requirements for the uplink to a Martian mission on the way to and from and on the surface of Mars, and the questions of optimal programming to such a mission, using the experiences from military media. The psychological problems encountered in space has been analyzed in great detail. [2] Kass and Kass list 28 such problems. Access to Earth mass media or quasi-live enterntainment and informational channel can help in solving the followings [from 3]: setting in of boredom and demoralisation; missing your own language - not fully fluent in the common language; lack of information sharing; confinement and isolation. A general homesickness would probably be an other problem. The opportunity of escaping from interpersonal problems can sometimes help, but have to handle with care since it can also keep the crew members from disuss and solve their problems in personal interaction. REFERENCES [1] Budden N. A., ed. (1999) Mars Field Geology, Biology, and Paleontology Workshop LPI No. 968 [2] Kanas, N. Psychological issues during long duration space missions. In 12th MIS Symposium, June 8 13, 1997, Washington,- 1997. [3] R. KASS and J. KASS: Psycho -social Training for man in space. Acta Astronautica Vol. 45, No. 2, pp. 115-118, 1999.

  18. Mariner Mars 1971: Press kit

    NASA Technical Reports Server (NTRS)

    Mittauer, R. T.

    1971-01-01

    The news release describes the 1971 launches of Mariner 8 and 9 which were to be the first attempt by NASA to orbit another planet, Mars. Described are: (1) mission capsule; (2) planetary missions; (3) aiming zones; (4) the spacecraft; (5) scientific experiments to be performed; (6) Atlas Centaur launch vehicle; (7) launch operations; (8) tracking and data system and mission operations; and (9) Mariner Mars 71 team and subcontractors.

  19. Operations concepts for Mars missions with multiple mobile spacecraft

    NASA Technical Reports Server (NTRS)

    Dias, William C.

    1993-01-01

    Missions are being proposed which involve landing a varying number (anywhere from one to 24) of small mobile spacecraft on Mars. Mission proposals include sample returns, in situ geochemistry and geology, and instrument deployment functions. This paper discusses changes needed in traditional space operations methods for support of rover operations. Relevant differences include more frequent commanding, higher risk acceptance, streamlined procedures, and reliance on additional spacecraft autonomy, advanced fault protection, and prenegotiated decisions. New methods are especially important for missions with several Mars rovers operating concurrently against time limits. This paper also discusses likely mission design limits imposed by operations constraints .

  20. Planetary mission summaries. Volume 1: Introduction and overview

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Tabular synopses of twelve missions are presented along with the Mariner Jupiter/Saturn 1977 mission for comparison. Mission definitions considered include: Mars Polar Orbiter; Mars Surface Sample Return; Mars Rover; Marine Jupiter/Uranus 1979 with Uranus Entry Probe; Mariner Jupiter Orbiter; Mariner Mercury Orbiter 1978; Early Mariner Comet Flyby Solar Electric Encke Slow Flyby; Mariner Encke Ballistic Flyby; Solar Electric Encke Rendezvous 1981; Venus Orbital Imaging Radar; Solar Electric Out-of-the-Eliptic Probe 1979. Technical conclusions of mission studies are given in order that these results may interact with the broader questions of scope, pace, and priorities in the planetary exploration program.

  1. Engaging Students Through Classroom Connection Webinars to Improve Their Understanding of the Mars Science Laboratory Mission

    NASA Technical Reports Server (NTRS)

    Graff, Paige V.; Achilles, Cherie

    2013-01-01

    Planetary exploration missions to other worlds, like Mars, can generate a lot of excitement and wonder for the public. The Mars Science Laboratory Mission is one of the latest planetary missions that has intrigued the public perhaps more than most. How can scientists and educational specialists capitalize on the allure of this mission and involve students and teachers in a way that not only shares the story of the mission, but actively engages classrooms with scientists and improves their understanding of the science? The Expedition Earth and Beyond (EEAB) Program [1], facilitated by the Astromaterials Research and Exploration Science (ARES) Directorate Education Program at the NASA Johnson Space Center achieves this by facilitating MSL mission focused classroom connection webinars. Five MSL-focused webinars facilitated through EEAB during the 2012 fall semester engaged almost 3000 students and teachers. Involved STEM experts/role models helped translate the science behind the Mars Science Laboratory mission in a comprehensive, exciting, and engaging manner. These virtual events captured participants attention while increasing their science awareness and understanding of the MSL mission.

  2. GLOBAL REFERENCE ATMOSPHERIC MODELS FOR AEROASSIST APPLICATIONS

    NASA Technical Reports Server (NTRS)

    Duvall, Aleta; Justus, C. G.; Keller, Vernon W.

    2005-01-01

    Aeroassist is a broad category of advanced transportation technology encompassing aerocapture, aerobraking, aeroentry, precision landing, hazard detection and avoidance, and aerogravity assist. The eight destinations in the Solar System with sufficient atmosphere to enable aeroassist technology are Venus, Earth, Mars, Jupiter, Saturn, Uranus, Neptune, and Saturn's moon Titan. Engineering-level atmospheric models for five of these targets - Earth, Mars, Titan, Neptune, and Venus - have been developed at NASA's Marshall Space Flight Center. These models are useful as tools in mission planning and systems analysis studies associated with aeroassist applications. The series of models is collectively named the Global Reference Atmospheric Model or GRAM series. An important capability of all the models in the GRAM series is their ability to simulate quasi-random perturbations for Monte Carlo analysis in developing guidance, navigation and control algorithms, for aerothermal design, and for other applications sensitive to atmospheric variability. Recent example applications are discussed.

  3. Reducing the Risk of Human Missions to Mars Through Testing

    NASA Astrophysics Data System (ADS)

    Drake, Bret G.

    2007-07-01

    During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in order to put into context an updated Integrated Space Transportation Plan (post- Columbia) and guide Agency planning. NASA was on the verge of committing significant funding in programs that would be better served if longer term goals were better known including the Orbital Space Plane, research on the ISS, National Aerospace Initiative, Shuttle Life Extension Program, Project Prometheus, as well as a wide range of technology development throughout the Agency. Much of the focus during this period was on integrating the results from the previous studies into more concrete implementation strategies in order to understand the relationship between NASA programs, timing, and resulting budgetary implications. This resulted in an integrated approach including lunar surface operations to retire risk of human Mars missions, maximum use of common and modular systems including what was termed the exploration transfer vehicle, Earth orbit and lunar surface demonstrations of long-life systems, collaboration of human and robotic missions to vastly increase mission return, and high-efficiency transportation systems (nuclear) for deep-space transportation and power. The data provided in this summary viewgraph presentation was developed to begin to address one of the key elements of the emerging implementation strategy, namely how lunar missions help retire risk of human missions to Mars. During this process the scope of the activity broadened into the issue of how testing in general, in various venues including the Moon, can help reduce the risk for Mars missions.

  4. Reducing the Risk of Human Missions to Mars Through Testing

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.

    2007-01-01

    During the summer of 2002 the NASA Deputy Administrator charted an internal NASA planning group to develop the rationale for exploration beyond low-Earth orbit. This team, termed the Exploration Blueprint, performed architecture analyses to develop roadmaps for how to accomplish the first steps beyond Low-Earth Orbit through the human exploration of Mars. The previous NASA Exploration Team (NEXT) activities laid the foundation and framework for development of NASA s Integrated Space Plan. The reference missions resulting from the analysis performed by the Exploration Blueprint team formed the basis for requirement definition, systems development, technology roadmapping, and risk assessments for future human exploration beyond low-Earth orbit. Emphasis was placed on developing recommendations on what could be done now to effect future exploration activities. The Exploration Blueprint team embraced the Stepping Stone approach to exploration where human and robotic activities are conducted through progressive expansion outward beyond low- Earth orbit. Results from this study produced a long-term strategy for exploration with near-term implementation plans, program recommendations, and technology investments. Specific results included the development of a common exploration crew vehicle concept, a unified space nuclear strategy, focused bioastronautics research objectives, and an integrated human and robotic exploration strategy. Recommendations from the Exploration Blueprint included the endorsement of the Nuclear Systems Initiative, augmentation of the bioastronautics research, a focused space transportation program including heavy-lift launch and a common exploration vehicle design for ISS and exploration missions, as well as an integrated human and robotic exploration strategy for Mars. Following the results of the Exploration Blueprint study, the NASA Administrator has asked for a recommendation by June, 2003 on the next steps in human and robotic exploration in order to put into context an updated Integrated Space Transportation Plan (post- Columbia) and guide Agency planning. NASA was on the verge of committing significant funding in programs that would be better served if longer term goals were better known including the Orbital Space Plane, research on the ISS, National Aerospace Initiative, Shuttle Life Extension Program, Project Prometheus, as well as a wide range of technology development throughout the Agency. Much of the focus during this period was on integrating the results from the previous studies into more concrete implementation strategies in order to understand the relationship between NASA programs, timing, and resulting budgetary implications. This resulted in an integrated approach including lunar surface operations to retire risk of human Mars missions, maximum use of common and modular systems including what was termed the exploration transfer vehicle, Earth orbit and lunar surface demonstrations of long-life systems, collaboration of human and robotic missions to vastly increase mission return, and high-efficiency transportation systems (nuclear) for deep-space transportation and power. The data provided in this summary viewgraph presentation was developed to begin to address one of the key elements of the emerging implementation strategy, namely how lunar missions help retire risk of human missions to Mars. During this process the scope of the activity broadened into the issue of how testing in general, in various venues including the Moon, can help reduce the risk for Mars missions.

  5. OHB's Exploration Capabilities Overview Relevant to Mars Sample Return Mission

    NASA Astrophysics Data System (ADS)

    Jaime, A.; Gerth, I.; Rohrbeck, M.; Scheper, M.

    2018-04-01

    The presentation will give an overview to all the OHB past and current projects that are relevant to the Mars Sample Return (MSR) mission, including some valuable lessons learned applicable to the upcoming MSR mission.

  6. Cryogenics and the Human Exploration of Mars

    NASA Technical Reports Server (NTRS)

    Salerno, Louis J.; Kittel, Peter; Rasky, Daniel J. (Technical Monitor)

    1997-01-01

    Current plans within NASA involve extending the human exploration of space from low earth orbit into the solar system, with the first human exploration of Mars presently planned in 2011. Integral to all hum Mars mission phases is cryogenic fluid management. Cryogenic fluids will be required both as propellant and for In-Situ Resource Utilization (ISRU). Without safe and efficient cryogen storage human Mars missions will not be possible. Effective control and handling of cryogenic fluids is the key to affordable Mars missions, and advancing active thermal control technology is synergistic with all of NASA's exploration initiatives and with existing and future instrument cooling programs, including MTPE and Origins. Present mission scenarios for human exploration require cryogenic propellant storage for up to 1700 days and for up to 60 metric tons. These requirements represent increases of an order of magnitude over previous storage masses and lifetimes. The key cryogenic terminology areas to be addressed in human Mars missions are long-term propellant storage, cryogenic refrigeration, cryogenic liquefaction, and zero gravity fluid management. Long-term storage for the thermal control of cryogenic propellants is best accomplished with a mix of passive and active technologies. Passive technologies such as advanced multilayer insulation (MLI) concepts will be combined with the development of active coolers (cryogenic refrigerators). Candidates for long-life active cooling applications include Reverse Turbo-Brayton, Stirling, and Pulse-Tube coolers. The integration of passive and active technologies will form a hybrid system optimized to minimize the launch mass while preserving the cryogenic propellants. Since cryogenic propellants are the largest mass that Mars missions must launch from earth, even a modest reduction in the percentage of propellant carried results in a significant weight saving. This paper will present a brief overview of cryogenic fluid management technology as it applies to the current human Mars mission scenarios.

  7. Interplanetary Mission Design Handbook: Earth-to-Mars Mission Opportunities 2026 to 2045

    NASA Technical Reports Server (NTRS)

    Burke, Laura M.; Falck, Robert D.; McGuire, Melissa L.

    2010-01-01

    The purpose of this Mission Design Handbook is to provide trajectory designers and mission planners with graphical information about Earth to Mars ballistic trajectory opportunities for the years of 2026 through 2045. The plots, displayed on a departure date/arrival date mission space, show departure energy, right ascension and declination of the launch asymptote, and target planet hyperbolic arrival excess speed, V(sub infinity), for each launch opportunity. Provided in this study are two sets of contour plots for each launch opportunity. The first set of plots shows Earth to Mars ballistic trajectories without the addition of any deep space maneuvers. The second set of plots shows Earth to Mars transfer trajectories with the addition of deep space maneuvers, which further optimize the determined trajectories. The accompanying texts explains the trajectory characteristics, transfers using deep space maneuvers, mission assumptions and a summary of the minimum departure energy for each opportunity.

  8. The human story of Crew 173- capturing a Mars analog mission

    NASA Astrophysics Data System (ADS)

    Shaw, Niamh; Musilova, Michaela; Pons Lorente, Arnau; Sisaid, Idriss; Naor, Roy; Blake, Richard

    2017-04-01

    An international crew of six scientists, engineers, artists and entrepreneurs with different space specialisations were selected by the Mars Society to take part in a Martian simulation in January 2017. An ambitious outreach and media strategy was developed, aimed at communicating the benefits of missions to Mars to the public and to capture the public's interest by telling the human story of the crew's mission. Entitled Crew 173 Team PRIMA, they entered the Mars Desert Research Station in the Utah Desert and conducted research in 3D printing, hydroponics, geology and astronomy. Both the scientific and community experience of this mission was documented through still image, video, audio, diary and daily journalling by the resident artist of the mission, Niamh Shaw. The full experience of the crew was documented (before, during and after the expedition), to capture each individual experience of the crew and the human experience of isolation of future human space missions.

  9. A new look at oxygen production on Mars - In situ propellant production (ISPP)

    NASA Technical Reports Server (NTRS)

    Frisbee, Robert H.; French, James R., Jr.; Lawton, Emil A.

    1987-01-01

    Consideration is given to the technique of producing oxygen on Mars from CO2 in the Martian atmosphere via in situ propellent production (ISPP). Mission implications of ISPP for both manned and unmanned Mars missions are described as well as ways to improve system reliability. Technology options that improve reliability and reduce power requirements include the use of adsorption pumps and advanced zirconia membranes. It is concluded that both manned and unmanned missions will benefit greatly from ISPP, especially in the context of a permanent manned base on Mars.

  10. Mechanical design of the Mars Pathfinder mission

    NASA Technical Reports Server (NTRS)

    Eisen, Howard Jay; Buck, Carl W.; Gillis-Smith, Greg R.; Umland, Jeffrey W.

    1997-01-01

    The Mars Pathfinder mission and the Sojourner rover is reported on, with emphasis on the various mission steps and the performance of the technologies involved. The mechanical design of mission hardware was critical to the success of the entry sequence and the landing operations. The various mechanisms employed are considered.

  11. Rationale for a Mars Pathfinder mission to Chryse Planitia and the Viking 1 lander

    NASA Technical Reports Server (NTRS)

    Craddock, Robert A.

    1994-01-01

    Presently the landing site for Mars Pathfinder will be constrained to latitudes between 0 deg and 30 deg N to facilitate communication with earth and to allow the lander and rover solar arrays to generate the maximum possible power. The reference elevation of the site must also be below 0 km so that the descent parachute, a Viking derivative, has sufficient time to open and slow the lander to the correct terminal velocity. Although Mars has as much land surface area as the continental crust of the earth, such engineering constraints immediately limit the number of possible landing sites to only three broad areas: Amazonis, Chryse, and Isidis Planitia. Of these, both Chryse and Isidis Planitia stand out as the sites offering the most information to address several broad scientific topics.

  12. MIRA: review of inputs from updated results of the phobos mission

    NASA Astrophysics Data System (ADS)

    Moroz, V. I.; Korablev, O. I.; Rodin, A. V.; Titov, D. V.

    1999-01-01

    The future Mars International Reference Atmosphere (MIRA) is intended to replace the present COSPAR Mars Reference Model compiled in 1979 on the basis of Mariner 9 and Viking 1,2 missions results. At the moment, several sources of the post-Viking data potentially useful for MIRA are available. Among them is a data set obtained during Phobos mission in 1989. The interpretation of these data has undergone thorough refinement, so final recommendations for MIRA can be made. The principal points are: 1) vertical profile of water vapor with a ``knee'' at the height about 25 km retrieved in the spring equinox season near equator; 2) variations of water vapor column density including peculiarities on the slopes of high mountains; 3) vertical profiles of ozone; 4) new estimates of CO abundance; 5) surface pressure/height mapping (CO2 altimetry) in selected regions; 6) optical depths of aerosols; 7) vertical profiles of aerosol between surface and 40 km; 8) properties of high altitude ice layers and clouds above mountains; 9) microphysical properties of aerosol particles (size, composition, and number density estimates). The data have been obtained by means of instruments AUGUSTE (UV and NIR spectrometers for limb sounding of the atmosphere using solar occultations), ISM (NIR scanning spectrometer), TERMOSKAN (thermal IR scanning radiometer), KRFM (near-UV and visible multi-band photometer). The observations were performed in equatorial regions during northern spring (solar aerocentric longitudes 8° < Ls < 18°).

  13. Terrain Modelling for Immersive Visualization for the Mars Exploration Rovers

    NASA Technical Reports Server (NTRS)

    Wright, J.; Hartman, F.; Cooper, B.; Maxwell, S.; Yen, J.; Morrison, J.

    2004-01-01

    Immersive environments are being used to support mission operations at the Jet Propulsion Laboratory. This technology contributed to the Mars Pathfinder Mission in planning sorties for the Sojourner rover and is being used for the Mars Exploration Rover (MER) missions. The stereo imagery captured by the rovers is used to create 3D terrain models, which can be viewed from any angle, to provide a powerful and information rich immersive visualization experience. These technologies contributed heavily to both the mission success and the phenomenal level of public outreach achieved by Mars Pathfinder and MER. This paper will review the utilization of terrain modelling for immersive environments in support of MER.

  14. Manned Mars mission crew factors

    NASA Technical Reports Server (NTRS)

    Santy, Patricia A.

    1986-01-01

    Crew factors include a wide range of concerns relating to the human system and its role in a Mars mission. There are two important areas which will play a large part in determining the crew for a Mars mission. The first relates to the goals and priorities determined for such a vast endeavor. The second is the design of the vehicle for the journey. The human system cannot be separated from the other systems in that vehicle. In fact it will be the human system which drives the development of many of the technical breakthroughs necessary to make a Mars mission successful. As much as possible, the engineering systems must adapt to the needs of the human system and its individual components.

  15. Mars MetNet Precursor Mission Status

    NASA Astrophysics Data System (ADS)

    Harri, A.-M.; Aleksashkin, S.; Guerrero, H.; Schmidt, W.; Genzer, M.; Vazquez, L.; Haukka, H.

    2013-09-01

    We are developing a new kind of planetary exploration mission for Mars in collaboration between the Finnish Meteorological Institute (FMI), Lavochkin Association (LA), Space Research Institute (IKI) and Institutio Nacional de Tecnica Aerospacial (INTA). The Mars MetNet mission is based on a new semi-hard landing vehicle called MetNet Lander (MNL). The scientific payload of the Mars MetNet Precursor [1] mission is divided into three categories: Atmospheric instruments, Optical devices and Composition and structure devices. Each of the payload instruments will provide significant insights in to the Martian atmospheric behavior. The key technologies of the MetNet Lander have been qualified and the electrical qualification model (EQM) of the payload bay has been built and successfully tested.

  16. Mars MetNet Mission Status

    NASA Astrophysics Data System (ADS)

    Harri, A.-M.; Aleksashkin, S.; Arruego, I.; Schmidt, W.; Genzer, M.; Vazquez, L.; Haukka, H.; Palin, M.; Nikkanen, T.

    2015-10-01

    New kind of planetary exploration mission for Mars is under development in collaboration between the Finnish Meteorological Institute (FMI), Lavochkin Association (LA), Space Research Institute (IKI) and Institutio Nacional de Tecnica Aerospacial (INTA). The Mars MetNet mission is based on a new semihard landing vehicle called MetNet Lander (MNL). The scientific payload of the Mars MetNet Precursor [1] mission is divided into three categories: Atmospheric instruments, Optical devices and Composition and structure devices. Each of the payload instruments will provide significant insights in to the Martian atmospheric behavior. The key technologies of the MetNet Lander have been qualified and the electrical qualification model (EQM) of the payload bay has been built and successfully tested.

  17. Mission and Design Sensitivities for Human Mars Landers Using Hypersonic Inflatable Aerodynamic Decelerators

    NASA Technical Reports Server (NTRS)

    Polsgrove, Tara; Thomas, Herbert D.; Dwyer Cianciolo, Alicia; Collins, Tim; Samareh, Jamshid

    2017-01-01

    This paper explores the impact of human Mars mission architecture decisions on the design and performance of a lander using the HIAD entry system: (a) Earth departure options, (b) Mars arrival options, (c) Entry Descent and Landing options.

  18. The ExoMars 2016 Mission arriving at Mars

    NASA Astrophysics Data System (ADS)

    Svedhem, H.; Vago, J. L.

    2016-12-01

    The ExoMars 2016 mission was launched on a Proton rocket from Baikonur, Kazakhstan, on 14 March 2016 and is scheduled to arrive at Mars on 19 October 2016. ExoMars is a joint programme of the European Space Agency (ESA) and Roscosmos, Russia. It consists of the ExoMars 2016 mission with the Trace Gas Orbiter, TGO, and the Entry Descent and Landing Demonstrator, EDM, named Schiaparelli, and the ExoMars 2020 mission, which carries a lander and a rover. The TGO scientific payload consists of four instruments. These are: ACS and NOMAD, both infrared spectrometers for atmospheric measurements in solar occultation mode and in nadir mode, CASSIS, a multichannel camera with stereo imaging capability, and FREND, an epithermal neutron detector to search for subsurface hydrogen (as proxy for water ice and hydrated minerals). The mass of the TGO is 3700 kg, including fuel. The EDM, with a mass of 600 kg, is mounted on top of the TGO as seen in its launch configuration. The EDM is carried to Mars by the TGO and is separated three days before arrival at Mars. In addition to demonstrating the landing capability two scientific investigations are included with the EDM. The AMELIA investigation aims at characterising the Martian atmosphere during the entry and descent using technical and engineering sensors of the EDM, and the DREAMS suite of sensors that will characterise the environment of the landing site for a few days after the landing. ESA provides the TGO spacecraft and the Schiaparelli Lander demonstrator, ESA member states provide two of the TGO instruments and Roscosmos provides the launcher and the other two TGO instruments. After the arrival of the ExoMars 2020 mission at the surface of Mars, the TGO will handle all communications between the Earth and the Rover. The communication between TGO and the rover/lander is done through a UHF communications system, a contribution from NASA. This presentation will cover a description of the 2016 mission, including the spacecraft, its payload and science and the related plans for scientific operations and measurements, a summary of the activities since arrival, and, if available, some first results of the mission.

  19. Micro-Pressure Sensors for Future Mars Missions

    NASA Technical Reports Server (NTRS)

    Catling, David C.

    1996-01-01

    The joint research interchange effort was directed at the following principal areas: u further development of NASA-Ames' Mars Micro-meteorology mission concept as a viable NASA space mission especially with regard to the science and instrument specifications u interaction with the flight team from NASA's New Millennium 'Deep-Space 2' (DS-2) mission with regard to selection and design of micro-pressure sensors for Mars u further development of micro-pressure sensors suitable for Mars The research work undertaken in the course of the Joint Research Interchange should be placed in the context of an ongoing planetary exploration objective to characterize the climate system on Mars. In particular, a network of small probes globally-distributed on the surface of the planet has often been cited as the only way to address this particular science goal. A team from NASA Ames has proposed such a mission called the Micrometeorology mission, or 'Micro-met' for short. Surface pressure data are all that are required, in principle, to calculate the Martian atmospheric circulation, provided that simultaneous orbital measurements of the atmosphere are also obtained. Consequently, in the proposed Micro-met mission a large number of landers would measure barometric pressure at various locations around Mars, each equipped with a micro-pressure sensor. Much of the time on the JRI was therefore spent working with the engineers and scientists concerned with Micro-met to develop this particular mission concept into a more realistic proposition.

  20. Mining the wealth of Phobos multispectral data contained in MEX-OMEGA and MRO-CRISM datasets

    NASA Astrophysics Data System (ADS)

    Pajola, Maurizio; Roush, Ted

    2016-04-01

    The origin of Phobos is still strongly debated between in situ versus asteroid capture formation scenarios. Growing interest in Phobos as a scientific destination is demonstrated by the multiple NASA-Discovery missions presented in 2015, the proposed ESA-M class mission PhoDEx, and JAXA's Mars Moon's sample return mission (MMX, Mars Moons eXploration). This large number of Phobos dedicated missions and JAXA's planned mission clearly illustrate the scientific interest in Phobos as a destination. We believe that there is still a wealth of data that can be mined in order to constrain Phobos' surface properties and possibly its origin. There are several multispectral Phobos datasets available on the NASA-Planetary Data System. In this work we focus on the first steps aimed to perform a new spectral analysis on the Mars satellite Phobos. We made use of the available Mars Express (MEX) OMEGA spectral cubes, obtained throughout the MEX mission, and Mars Reconnaissance Orbiter (MRO) CRISM hyperspectral data obtained during early MRO orbits around Mars. Previous analyses (Fraeman et al. 2012, 2014) mainly focus on three specific Regions of Interest, ROIs, located inside the so-called blue and red regions of Phobos, i.e. inside or close to Stickney crater (the biggest crater on Phobos, 8-km in diameter) and its eastern ejecta blanket. We extended this analysis by considering multiple ROIs located both in the leading and the trailing hemispheres of the satellite, taking advantage of the broader coverage of the OMEGA and CRISM data. This provides the possibility to detect spectral properties of intermediate areas located in the transition region between the blue and the red spectral unit. The analyses can enable i) documentation of how the spectral slope changes between these two units, ii) their boundaries and surface extent, and iii) identify additional surface materials, if present. This work paves the way to a more thorough analysis, foreseen in the near future, where the widest spectral wavelength range available (from near UV to far-IR) will be mined, returning a desirable complete picture of surface properties to enable planning for, and validation/confirmation by, future Phobos spacecraft. Acknowledgements: We make use of the public NASA-Planetary Data System MEX-OMEGA and MRO-CRISM spectral data of Phobos. M.P. was supported for this research by an appointment to the NASA Postdoctoral Program at the Ames Research Center, administered by Oak Ridge Associated Universities through a contract with NASA. References: Fraeman et al. 2012, J. Geophy. Res, E00J15, 10.1029/2012JE004137; Fraeman et al., 2014, Icarus, 229, 196-205, 10.1016/icarus.2013.11.021

  1. The Mars Express/NASA Project at JPL

    NASA Technical Reports Server (NTRS)

    Thompson, T. W.; Horttor, R. L.; Acton, C. H., Jr.; Zamani, P.; Johnson, W. T. K.; Plaut, J. J.; Holmes, D. P.; No, S.; Asmar, S.; Goltz, G.

    2005-01-01

    ESA s Mars Express Mission involves international collaboration between the European Space Agency (ESA) and the European space agencies with the National Aeronautics and Space Administration (NASA) as a junior partner. The primary objective of this mission is to search for hydrologic resources on the surface of Mars. Mars Express was launched from Baikonur, Kazakhstan on June 2, 2003 and arrived at Mars on December 25, 2003. Orbital science observations started in January 2004.

  2. INRRI-EDM/2016: the first laser retroreflector on the surface of Mars

    NASA Astrophysics Data System (ADS)

    Dell'Agnello, S.; Delle Monache, G.; Porcelli, L.; Boni, A.; Contessa, S.; Ciocci, E.; Martini, M.; Tibuzzi, M.; Intaglietta, N.; Salvatori, L.; Tuscano, P.; Patrizi, G.; Mondaini, C.; Lops, C.; Vittori, R.; Maiello, M.; Flamini, E.; Marchetti, E.; Bianco, G.; Mugnuolo, R.; Cantone, C.

    2017-01-01

    During Summer 2015 the SCF_Lab (Satellite/lunar/GNSS laser ranging/altimetry and cube/microsat Characterization Facilities Laboratory, http://www.lnf.infn.it/esperimenti/etrusco, Team of INFN-LNF, with support by ASI, carried out an intense activity of final design, manufacturing and testing in order to construct, space qualify and finally integrate INRRI-EDM/2016 on ESA's ExoMars EDM spacecraft (also dubbed "Schiaparelli"), which was successfully launched on March 14, 2016. INRRI (INstrument for landing-Roving laser Retroreflector Investigation) for the EDM (Entry descent and landing Demonstration Module) 2016 mission is a compact, lightweight, passive, maintenance-free array of eight cube corner laser retroreflectors fixed to an aluminum alloy frame through the use of silicon rubber suitable for space applications. INRRI was installed on the top panel of the EDM Central Bay on October 14, 2015. It will enable the EDM to be laser-located from Mars orbiters, through laser ranging and altimetry, lidar atmospheric observations from orbit, laser flashes emitted by orbiters, and lasercom. One or all of the above means of observation can be supported by INRRI when there is an active, laser-equipped orbiter, especially after EDM end-of-life and for a long time. INRRI goals will cover science (Mars geodesy/geophysics, future Mars test of General Relativity, GR), technology and exploration. Concerning the latter two, INRRI will support mars-georeferencing of the EDM landing site, support potential precision lidar-based landing next to the EDM, support test & diagnostics of lasercom for data exchange among Mars orbit, Mars surface and Earth, and it will be a precursor for additional Mars surface retroreflectors, for example on exploration rovers. This paper describes in detail our innovative payload, hopefully the very first to be deployed safely with the lander Schiaparelli on the Mars surface, and its space qualification for the ExoMars EDM 2016 mission. Despite the fate of the Schiaparelli landing, which is still under the investigation of ESA and the industry, this paper remains a valuable reference for next INRRI-like laser retroreflectors arrays.

  3. Processing of Space Resources to Enable the Vision for Space Exploration

    NASA Technical Reports Server (NTRS)

    Curreri, Peter A.

    2006-01-01

    The NASA human exploration program as directed by the Vision for Exploration (G.W. Bush, Jan. 14,2004) includes developing methods to process materials on the Moon and beyond to enable safe and affordable human exploration. Processing space resources was first popularized (O Neill 1976) as a technically viable, economically feasible means to build city sized habitats and multi GWatt solar power satellites in Earth/Moon space. Although NASA studies found the concepts to be technically reasonable in the post Apollo era (AMES 1979), the front end costs the limits of national or corporate investment. In the last decade analysis of space on has shown it to be economically justifiable even on a relatively small mission or commercial scenario basis. The Mars Reference Mission analysis (JSC 1997) demonstrated that production of return propellant on Mars can enable an order of magnitude decrease in the costs of human Mars missions. Analysis (by M. Duke 2003) shows that production of propellant on the Moon for the Earth based satellite industries can be commercially viable after a human lunar base is established. Similar economic analysis (Rapp 2005) also shows large cost benefits for lunar propellant production for Mars missions and for the use of lunar materials for the production of photovoltaic power (Freundlich 2005). Recent technologies could enable much smaller initial costs, to achieve mass, energy, and life support self sufficiency, than were achievable in the 1970s. If the Exploration Vision program is executed with a front end emphasis on space resources, it could provide a path for human self reliance beyond Earth orbit. This path can lead to an open, non-zero-sum, future for humanity with safer human competition with limitless growth potential. This paper discusses extension of the analysis for space resource utilization, to determine the minimum systems necessary for human self sufficiency and growth off Earth. Such a approach can provide a more compelling and comprehensive path to space resource utilization.

  4. Mars Global Surveyor Mission: Environmental Assessment

    NASA Technical Reports Server (NTRS)

    1995-01-01

    This environmental assessment addresses the proposed action to complete the integration and launch the Mars Global Surveyor (MGS) spacecraft from Cape Canaveral Air Station (CCAS), Florida, during the launch window in November 1996. Mars Global Surveyor is part of the Solar System Exploration Program to the inner planets designed to maintain a sufficient level of scientific investigation and accomplishment so that the United States retains a leading position in solar system exploration through the end of the century. The Program consists of a specific sequence of missions, based on technological readiness, launch opportunities, rapidity of data return, and a balance of scientific disciplines. The purpose of the MGS mission would be to deliver a spacecraft platform to a low-altitude polar orbit around Mars where it would collect global observations of basic geological, geophysical, and climatological processes of the planet. To satisfy this purpose, the MGS mission would support a scientific set of objectives. Detailed global maps of surface topography, the distribution of minerals, the planet's mass, size, and shape, the characterization of Mars gravitational and magnetic fields, and the monitoring of global weather, collected over the period of one Martian year (about two Earth years), would help answer some of the questions about the evolution of Mars. Such an investigation would help scientists better understand the current state of water on Mars, the evolution of the planet's atmosphere, and the factors that led to major changes in the Martian climate. It would also provide much needed information on the magnetic field of Mars. Data collected from this mission would provide insight into the evolution of both Earth and the solar system, as well as demonstrate technological approaches that could be applicable to future Mars missions.

  5. Flight Mechanics of the Entry, Descent and Landing of the ExoMars Mission

    NASA Technical Reports Server (NTRS)

    HayaRamos, Rodrigo; Boneti, Davide

    2007-01-01

    ExoMars is ESA's current mission to planet Mars. A high mobility rover and a fixed station will be deployed on the surface of Mars. This paper regards the flight mechanics of the Entry, Descent and Landing (EDL) phases used for the mission analysis and design of the Baseline and back-up scenarios of the mission. The EDL concept is based on a ballistic entry, followed by a descent under parachutes and inflatable devices (airbags) for landing. The mission analysis and design is driven by the flexibility in terms of landing site, arrival dates and the very stringent requirement in terms of landing accuracy. The challenging requirements currently imposed to the mission need innovative analysis and design techniques to support system design trade-offs to cope with the variability in entry conditions. The concept of the Global Entry Corridor has been conceived, designed, implemented and successfully validated as a key tool to provide a global picture of the mission capabilities in terms of landing site reachability.

  6. Manned Mars mission accommodation: Sprint mission

    NASA Technical Reports Server (NTRS)

    Cirillo, William M.; Kaszubowski, Martin J.; Ayers, J. Kirk; Llewellyn, Charles P.; Weidman, Deene J.; Meredith, Barry D.

    1988-01-01

    The results of a study conducted at the NASA-LaRC to assess the impacts on the Phase 2 Space Station of Accommodating a Manned Mission to Mars are documented. In addition, several candidate transportation node configurations are presented to accommodate the assembly and verification of the Mars Mission vehicles. This study includes an identification of a life science research program that would need to be completed, on-orbit, prior to mission departure and an assessment of the necessary orbital technology development and demonstration program needed to accomplish the mission. Also included is an analysis of the configuration mass properties and a preliminary analysis of the Space Station control system sizing that would be required to control the station. Results of the study indicate the Phase 2 Space Station can support a manned mission to Mars with the addition of a supporting infrastructure that includes a propellant depot, assembly hangar, and a heavy lift launch vehicle to support the large launch requirements.

  7. Unmanned surface traverses of Mars and Moon: Science objectives, payloads, operations

    NASA Technical Reports Server (NTRS)

    Jaffe, L. D.; Choate, R.

    1973-01-01

    Science objectives and properties to be measured are outlined for long surface traverse missions on Mars and the Moon, with remotely-controlled roving vehicles. A series of candidate rover payloads is proposed for each planet, varying in weight, cost, purpose, and development needed. The smallest weighs 35 kg; the largest almost 300 kg. A high degree of internal control will be needed on the Mars rover, including the ability to carry out complex science sequences. Decision-making by humans in the Mars mission includes supervisory control of rover operations and selection of features and samples of geological and biological interest. For the lunar mission, less control on the rover and more on earth is appropriate. Science portions of the rover mission profile are outlined, with timelines and mileage breakdowns. Operational problem areas for Mars include control, communications, data storage, night operations, and the mission operations system. For the moon, science data storage on the rover would be unnecessary and control much simpler.

  8. Selecting A Landing Site Of Astrobiological Interest For Mars Landers And Sample Return Missions

    NASA Astrophysics Data System (ADS)

    Wills, Danielle; Monaghan, E.; Foing, B.

    2008-09-01

    The landscape of Mars, despite its apparent hostility to life, is riddled with geological and mineralogical signs of past or present hydrological activity. As such, it is a key target for astrobiological exploration. The aim of this work is to combine data and studies to select top priority landing locations for in-situ landers and sample return missions to Mars. We report in particular on science and technical criteria and our data analysis for sites of astrobiological interest. This includes information from previous missions (such as Mars Express, MGS, Odyssey, MRO and MER rovers) on mineralogical composition, geomorphology, evidence from past water history from imaging and spectroscopic data, and existence of in-situ prior information from landers and rovers (concerning evidence for volatiles, organics and habitability conditions). We discuss key mission objectives, and consider the accessibility of chosen locations. We describe what additional measurements are needed, and outline the technical and scientific operations requirements of in-situ landers and sample return missions to Mars.

  9. Orbit selection and its impact on radiation warning architecture for a human mission to Mars.

    PubMed

    Turner, R E; Levine, J M

    1998-01-01

    With the recent announcement of the discovery of the possibility of life on Mars, there is renewed interest in Mars missions, perhaps eventually in human missions. Astronauts on such missions are at risk to occasional periods of enhanced high energy particle flux from the sun known as Solar Particle Events. These events can pose a substantial risk to the health of the astronauts and to the on-board electronics. Effective forecast and warning of these events could provide time to take steps to minimize the risk (retreating to a safe haven, shutting down sensitive equipment, etc.) Providing that forecast capability, will require additional monitoring capability. The extent of this architecture is sensitive to the orbit selected for the transfer to and from Mars. This paper looks at the major classes of Mars missions (Conjunction and Opposition) and sub-categories of these classes and draws conclusions on the number of monitoring satellites needed for each, with a goal to reducing total system cost through optimum orbit selection.

  10. Observations of Crew Dynamics during Mars Analog Simulations

    NASA Technical Reports Server (NTRS)

    Cusack, Stacy L.

    2010-01-01

    This presentation reviews the crew dynamics during two simulations of Mars Missions. Using an analog of a Mars habitat in two locations, Flashline Mars Arctic Research Station (FMARS) which is located on Devon Island at 75 deg North in the Canadian Arctic, and the Mars Desert Research Station (MDRS) which is located in the south of Utah, the presentation examines the crew dynamics in relation to the leadership style of the commander of the mission. The difference in the interaction of the two crews were shown to be related to the leadership style and the age group in the crew. As much as possible the habitats and environment was to resemble a Mars outpost. The difference between the International Space Station and a Mars missions is reviewed. The leadership styles are reviewed and the contrast between the FMARS and the MDRS leadership styles were related to crew productivity, and the personal interactions between the crew members. It became evident that leadership styles and interpersonal skill had more affect on mission success and crew dynamics than other characteristics.

  11. Mars curiosity mission

    NASA Image and Video Library

    2012-08-04

    NASA welcomed hundreds of children and accompanying adults to its INFINITY visitor center on Aug. 4, offering Mars-related activities that focused attention on the space agency's Curiosity mission to the Red Planet. Among other attractions, 3-D images from Mars provided 'Wow!' glimpses of the Red Planet. In addition to the Mars activities, visitors were able to tour other space-related exhibits at the center.

  12. MAVEN - Mars Atmosphere and Volatile EvolutioN Mission

    NASA Technical Reports Server (NTRS)

    Grebowsky, Joseph M.; Jakosky, Bruce M.

    2011-01-01

    NASA's MAVEN mission (to be launched in late 2013) is the first mission to Mars devoted to sampling all of the upper atmosphere neutral and plasma environments, including the well-mixed atmosphere, the exosphere, ionosphere, outer magnetosphere and near-Mars solar wind. It will fill in some measurement gaps remaining from the successful Mars Global Surveyor and the on-going Mars Express missions. The primary science objectives of MAVEN are: 1. Provide a comprehensive picture of the present state of the upper atmosphere and ionosphere of Mars; 2. Understand the processes controlling the present state; and 3. Determine how loss of volatiles to outer space in the present epoch varies with changing solar condition - EUY, solar wind and interplanetary magnetic field measurements will provide the varying solar energy inputs into the system. Knowing how these processes respond to the Sun's energy inputs in the current epoch will provide a framework for projecting atmospheric processes back in time to profile MARS' atmospheric evolution and to explore "where the water went", A description will be given of the science objectives, the instruments, and the current status of the project, emphasizing the value of having collaborations between the MAVEN project and the Mars upper atmosphere science community.

  13. Earth-Mars transfers through Moon Distant Retrograde Orbits

    NASA Astrophysics Data System (ADS)

    Conte, Davide; Di Carlo, Marilena; Ho, Koki; Spencer, David B.; Vasile, Massimiliano

    2018-02-01

    This paper focuses on the trajectory design which is relevant for missions that would exploit the use of asteroid mining in stable cis-lunar orbits to facilitate deep space missions, specifically human Mars exploration. Assuming that a refueling "gas station" is present at a given lunar Distant Retrograde Orbit (DRO), ways of departing from the Earth to Mars via that DRO are analyzed. Thus, the analysis and results presented in this paper add a new cis-lunar departure orbit for Earth-Mars missions. Porkchop plots depicting the required C3 at launch, v∞ at arrival, Time of Flight (TOF), and total Δ V for various DRO departure and Mars arrival dates are created and compared with results obtained for low Δ V Low Earth Orbit (LEO) to Mars trajectories. The results show that propellant-optimal trajectories from LEO to Mars through a DRO have higher overall mission Δ V due to the additional stop at the DRO. However, they have lower Initial Mass in LEO (IMLEO) and thus lower gear ratio as well as lower TOF than direct LEO to Mars transfers. This results in a lower overall spacecraft dry mass that needs to be launched into space from Earth's surface.

  14. Design of Photovoltaic Power System for a Precursor Mission for Human Exploration of Mars

    NASA Technical Reports Server (NTRS)

    Mcnatt, Jeremiah; Landis, Geoffrey; Fincannon, James

    2016-01-01

    This project analyzed the viability of a photovoltaic power source for technology demonstration mission to demonstrate Mars in-situ resource utilization (ISRU) to produce propellant for a future human mission, based on technology available within the next ten years. For this assessment, we performed a power-system design study for a scaled ISRU demonstrator lander on the Mars surface based on existing solar array technologies.

  15. Mars Underground News.

    NASA Astrophysics Data System (ADS)

    Edgett, K.

    Contents: Next entry to Mars (Mars Pathfinder and the microrover Sojourner). Hello, Mars, we're back! Mars Global Surveyor update. The Mars program - 2001 and beyond. Schedule of missions to Mars (as of June 11, 1997). Mars on the Web.

  16. Biologically-inspired navigation and flight control for Mars flyer missions

    NASA Technical Reports Server (NTRS)

    Thakoor, S.; Chahl, J.; Hine, B.; Zornetzer, S.

    2003-01-01

    Bioinspired Engineering Exploration Systems (BEES), is enabling new bioinspired sensors for autonomous exploration of Mars. The steps towards autonomy in development of these BEES flyers are described. A future set of Mars mission that are uniquely enabled by surch flyers are finally described.

  17. Dosimetry of a Deep-Space (Mars) Mission using Measurements from RAD on the Mars Science Laboratory

    NASA Astrophysics Data System (ADS)

    Hassler, D.; Zeitlin, C.; Ehresmann, B.; Wimmer-Schweingruber, R. F.; Guo, J.; Matthiae, D.; Reitz, G.

    2017-12-01

    The space radiation environment is one of the outstanding challenges of a manned deep-space mission to Mars. To improve our understanding and take us one step closer to enabling a human Mars to mission, the Radiation Assessment Detector (RAD) on the Mars Science Laboratory (MSL) has been characterizing the radiation environment, both during cruise and on the surface of Mars for the past 5 years. Perhaps the most significant difference between space radiation and radiation exposures from terrestrial exposures is that space radiation includes a significant component of heavy ions from Galactic Cosmic Rays (GCRs). Acute exposures from Solar Energetic Particles (SEPs) are possible during and around solar maximum, but the energies from SEPs are generally lower and more easily shielded. Thus the greater concern for long duration deep-space missions is the GCR exposure. In this presentation, I will review the the past 5 years of MSL RAD observations and discuss current approaches to radiation risk estimation used by NASA and other space agencies.

  18. Planning for the V&V of infused software technologies for the Mars Science Laboratory Mission

    NASA Technical Reports Server (NTRS)

    Feather, Martin S.; Fesq, Lorraine M.; Ingham, Michel D.; Klein, Suzanne L.; Nelson, Stacy D.

    2004-01-01

    NASA's Mars Science Laboratory (MSL) rover mission is planning to make use of advanced software technologies in order to support fulfillment of its ambitious science objectives. The mission plans to adopt the Mission Data System (MDS) as the mission software architecture, and plans to make significant use of on-board autonomous capabilities for the rover software.

  19. Mars sample return mission architectures utilizing low thrust propulsion

    NASA Astrophysics Data System (ADS)

    Derz, Uwe; Seboldt, Wolfgang

    2012-08-01

    The Mars sample return mission is a flagship mission within ESA's Aurora program and envisioned to take place in the timeframe of 2020-2025. Previous studies developed a mission architecture consisting of two elements, an orbiter and a lander, each utilizing chemical propulsion and a heavy launcher like Ariane 5 ECA. The lander transports an ascent vehicle to the surface of Mars. The orbiter performs a separate impulsive transfer to Mars, conducts a rendezvous in Mars orbit with the sample container, delivered by the ascent vehicle, and returns the samples back to Earth in a small Earth entry capsule. Because the launch of the heavy orbiter by Ariane 5 ECA makes an Earth swing by mandatory for the trans-Mars injection, its total mission time amounts to about 1460 days. The present study takes a fresh look at the subject and conducts a more general mission and system analysis of the space transportation elements including electric propulsion for the transfer. Therefore, detailed spacecraft models for orbiters, landers and ascent vehicles are developed. Based on that, trajectory calculations and optimizations of interplanetary transfers, Mars entries, descents and landings as well as Mars ascents are carried out. The results of the system analysis identified electric propulsion for the orbiter as most beneficial in terms of launch mass, leading to a reduction of launch vehicle requirements and enabling a launch by a Soyuz-Fregat into GTO. Such a sample return mission could be conducted within 1150-1250 days. Concerning the lander, a separate launch in combination with electric propulsion leads to a significant reduction of launch vehicle requirements, but also requires a large number of engines and correspondingly a large power system. Therefore, a lander performing a separate chemical transfer could possibly be more advantageous. Alternatively, a second possible mission architecture has been developed, requiring only one heavy launch vehicle (e.g., Proton). In that case the lander is transported piggyback by the electrically propelled orbiter.

  20. NASA Lunar and Planetary Mapping and Modeling

    NASA Astrophysics Data System (ADS)

    Day, B. H.; Law, E.

    2016-12-01

    NASA's Lunar and Planetary Mapping and Modeling Portals provide web-based suites of interactive visualization and analysis tools to enable mission planners, planetary scientists, students, and the general public to access mapped lunar data products from past and current missions for the Moon, Mars, and Vesta. New portals for additional planetary bodies are being planned. This presentation will recap significant enhancements to these toolsets during the past year and look forward to the results of the exciting work currently being undertaken. Additional data products and tools continue to be added to the Lunar Mapping and Modeling Portal (LMMP). These include both generalized products as well as polar data products specifically targeting potential sites for the Resource Prospector mission. Current development work on LMMP also includes facilitating mission planning and data management for lunar CubeSat missions, and working with the NASA Astromaterials Acquisition and Curation Office's Lunar Apollo Sample database in order to help better visualize the geographic contexts from which samples were retrieved. A new user interface provides, among other improvements, significantly enhanced 3D visualizations and navigation. Mars Trek, the project's Mars portal, has now been assigned by NASA's Planetary Science Division to support site selection and analysis for the Mars 2020 Rover mission as well as for the Mars Human Landing Exploration Zone Sites. This effort is concentrating on enhancing Mars Trek with data products and analysis tools specifically requested by the proposing teams for the various sites. Also being given very high priority by NASA Headquarters is Mars Trek's use as a means to directly involve the public in these upcoming missions, letting them explore the areas the agency is focusing upon, understand what makes these sites so fascinating, follow the selection process, and get caught up in the excitement of exploring Mars. The portals also serve as outstanding resources for education and outreach. As such, they have been designated by NASA's Science Mission Directorate as key supporting infrastructure for the new education programs selected through the division's recent CAN.

  1. Interpreting Radar View near Mars' South Pole, Orbit 1360

    NASA Technical Reports Server (NTRS)

    2006-01-01

    A radargram from the Shallow Subsurface Radar instrument (SHARAD) on NASA's Mars Reconnaissance Orbiter is shown in the upper-right panel and reveals detailed structure in the polar layered deposits of the south pole of Mars.

    The sounding radar collected the data presented here during orbit 1360 of the mission, on Nov. 10, 2006.

    The horizontal scale in the radargram is distance along the ground track. It can be referenced to the ground track map shown in the lower right. The radar traversed from about 74 degrees to 85 degrees south latitude, or about 650 kilometers (400 miles). The ground track map shows elevation measured by the Mars Orbiter Laser Altimeter on NASA's Mars Global Surveyor orbiter. Green indicates low elevation; reddish-white indicates higher elevation. The traverse proceeds up onto a plateau formed by the layers.

    The vertical scale on the radargram is time delay of the radar signals reflected back to Mars Reconnaissance Orbiter from the surface and subsurface. For reference, using an assumed velocity of the radar waves in the subsurface, time is converted to depth below the surface at one place: about 800 meters (2,600 feet) to one of the strongest subsurface reflectors. This reflector marks the base of the polar layered deposits. The color scale varies from black for weak reflections to white for strong reflections.

    The middle panel shows mapping of the major subsurface reflectors, some of which can be traced for a distance of 100 kilometers (60 miles) or more. The layering manifests the recent climate history of Mars, recorded by the deposition and removal of ice and dust.

    The Shallow Subsurface Radar was provided by the Italian Space Agency (ASI). Its operations are led by the University of Rome and its data are analyzed by a joint U.S.-Italian science team. NASA's Jet Propulsion Laboratory, a division of the California Institute of Technology, Pasadena, manages the Mars Reconnaissance Orbiter for the NASA Science Mission Directorate, Washington.

  2. The rocky Soviet road to Mars

    NASA Astrophysics Data System (ADS)

    Klaes, Larry

    1990-08-01

    The history of the Soviet space program is reviewed with particular attention given to the Soviet Mars exploration program. Missions of the Mars and Zond series and their exploration of Mars are described in detail, and the progress of the Soviet Mars exploration program is compared and contrasted with that of U.S. programs. Soviet space exploration in the 1980s is reviewed, noting that changes in political climate enabled more open discussion of the Phobos mission, which facilitated both international cooperation in assembling the craft and extensive U.S.-Soviet cooperation in the communications aspect of the probe through use of NASA's Deep Space Network of radio telescopes. The Phobos 1 and Phobos 2 missions are discussed and reasons for difficulties are analyzed; the future of the Soviet Mars program is reviewed.

  3. The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

    NASA Technical Reports Server (NTRS)

    Johnston, M. Daniel; Zurek, Richard W.

    2016-01-01

    The Mars Reconnaissance Orbiter ( MRO ) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low -altitude science orbit. The spacecraft has been on station in its 255 x 320 k m, sun -synchronous (approximately 3 am -pm ), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

  4. Mariner IV Mission to Mars. Part I

    NASA Technical Reports Server (NTRS)

    James, Jack N.

    1965-01-01

    This technical report is a series of individual papers documenting the Mariner-Mars project from its beginning in 1962 following the successful Mariner-Venus mission. Part I is pre-encounter data. It includes papers on the design, development, and testing of Mariner IV, as well as papers detailing methods of maintaining communication with and obtaining data from the spacecraft during flight, and expected results during encounter with Mars. Part 11, post-encounter data, to be published later, will consist of documentation of the events taking place during Mariner IV's encounter with Mars and thereafter. The Mariner-Mars mission, the culmination of an era of spacecraft development, has contributed much new technology to be used in future projects.

  5. Hydrothermal Alteration Mineralogy Characterized Through Multiple Analytical Methods: Implications for Mars

    NASA Astrophysics Data System (ADS)

    Black, S.; Hynek, B. M.; Kierein-Young, K. S.; Avard, G.; Alvarado-Induni, G.

    2015-12-01

    Proper characterization of mineralogy is an essential part of geologic interpretation. This process becomes even more critical when attempting to interpret the history of a region remotely, via satellites and/or landed spacecraft. Orbiters and landed missions to Mars carry with them a wide range of analytical tools to aid in the interpretation of Mars' geologic history. However, many instruments make a single type of measurement (e.g., APXS: elemental chemistry; XRD: mineralogy), and multiple data sets must be utilized to develop a comprehensive understanding of a sample. Hydrothermal alteration products often exist in intimate mixtures, and vary widely across a site due to changing pH, temperature, and fluid/gas chemistries. These characteristics require that we develop a detailed understanding regarding the possible mineral mixtures that may exist, and their detectability in different instrument data sets. This comparative analysis study utilized several analytical methods on existing or planned Mars rovers (XRD Raman, LIBS, Mössbauer, and APXS) combined with additional characterization (thin section, VNIR, XRF, SEM-EMP) to develop a comprehensive suite of data for hydrothermal alteration products collected from Poás and Turrialba volcanoes in Costa Rica. Analyzing the same samples across a wide range of instruments allows for direct comparisons of results, and identification of instrumentation "blind spots." This provides insight into the ability of in-situ analyses to comprehensively characterize sites on Mars exhibiting putative hydrothermal characteristics, such as the silica and sulfate deposits at Gusev crater [eg: Squyres et al., 2008], as well as valuable information for future mission planning and data interpretation. References: Squyres et al. (2008), Detection of Silica-Rich Deposits on Mars, Science, 320, 1063-1067, doi:10.1126/science.1155429.

  6. Calibration OGSEs for multichannel radiometers for Mars atmosphere studies

    NASA Astrophysics Data System (ADS)

    Jiménez, J. J.; J Álvarez, F.; Gonzalez-Guerrero, M.; Apéstigue, V.; Martín, I.; Fernández, J. M.; Fernán, A. A.; Arruego, I.

    2018-02-01

    This work describes several Optical Ground Support Equipment (OGSEs) developed by INTA (Spanish Institute of Aerospace Technology—Instituto Nacional de Técnica Aeroespacial) for the calibration and characterization of their self-manufactured multichannel radiometers (solar irradiance sensors—SIS) developed for working on the surface of Mars and studying the atmosphere of that planet. Nowadays, INTA is developing two SIS for the ESA ExoMars 2020 and for the JPL/NASA Mars 2020 missions. These calibration OGSEs have been improved since the first model in 2011 developed for Mars MetNet Precursor mission. This work describes the currently used OGSE. Calibration tests provide an objective evidence of the SIS performance, allowing the conversion of the electrical sensor output into accurate physical measurements (irradiance) with uncertainty bounds. Calibration results of the SIS on board of the Dust characterisation, Risk assessment, and Environment Analyzer on the Martian Surface (DREAMS) on board the ExoMars 2016 Schiaparelli module (EDM—entry and descent module) are also presented, as well as their error propagation. Theoretical precision and accuracy of the instrument are determined by these results. Two types of OGSE are used as a function of the pursued aim: calibration OGSEs and Optical Fast Verification (OFV) GSE. Calibration OGSEs consist of three setups which characterize with the highest possible accuracy, the responsivity, the angular response and the thermal behavior; OFV OGSE verify that the performance of the sensor is close to nominal after every environmental and qualification test. Results show that the accuracy of the calibrated sensors is a function of the accuracy of the optical detectors and of the light conditions. For normal direct incidence and diffuse light, the accuracy is in the same order of uncertainty as that of the reference cell used for fixing the irradiance, which is about 1%.

  7. Contamination Knowledge Strategy for the Mars 2020 Sample-Collecting Rover

    NASA Technical Reports Server (NTRS)

    Farley, K. A.; Williford, K.; Beaty, D W.; McSween, H. Y.; Czaja, A. D.; Goreva, Y. S.; Hausrath, E.; Herd, C. D. K.; Humayun, M.; McCubbin, F. M.; hide

    2017-01-01

    The Mars 2020 rover will collect carefully selected samples of rock and regolith as it explores a potentially habitable ancient environment on Mars. Using the drill, rock cores and regolith will be collected directly into ultraclean sample tubes that are hermetically sealed and, later, deposited on the surface of Mars for potential return to Earth by a subsequent mission. Thorough characterization of any contamination of the samples at the time of their analysis will be essential for achieving the objectives of Mars returned sample science (RSS). We refer to this characterization as contamination knowledge (CK), which is distinct from contamination control (CC). CC is the set of activities that limits the input of contaminating species into a sample, and is specified by requirement thresholds. CK consists of identifying and characterizing both potential and realized contamination to better inform scientific investigations of the returned samples. Based on lessons learned by other sample return missions with contamination-sensitive scientific objectives, CC needs to be "owned" by engineering, but CK needs to be "owned" by science. Contamination present at the time of sample analysis will reflect the sum of contributions from all contamination vectors up to that point in time. For this reason, understanding the integrated history of contamination may be crucial for deciphering potentially confusing contaminant-sensitive observations. Thus, CK collected during the Mars sample return (MSR) campaign must cover the time period from the initiation of hardware construction through analysis of returned samples in labs on Earth. Because of the disciplinary breadth of the scientific objectives of MSR, CK must include a broad spectrum of contaminants covering inorganic (i.e., major, minor, and trace elements), organic, and biological molecules and materials.

  8. Calibration OGSEs for multichannel radiometers for Mars atmosphere studies

    NASA Astrophysics Data System (ADS)

    Jiménez, J. J.; J Álvarez, F.; Gonzalez-Guerrero, M.; Apéstigue, V.; Martín, I.; Fernández, J. M.; Fernán, A. A.; Arruego, I.

    2018-06-01

    This work describes several Optical Ground Support Equipment (OGSEs) developed by INTA (Spanish Institute of Aerospace Technology—Instituto Nacional de Técnica Aeroespacial) for the calibration and characterization of their self-manufactured multichannel radiometers (solar irradiance sensors—SIS) developed for working on the surface of Mars and studying the atmosphere of that planet. Nowadays, INTA is developing two SIS for the ESA ExoMars 2020 and for the JPL/NASA Mars 2020 missions. These calibration OGSEs have been improved since the first model in 2011 developed for Mars MetNet Precursor mission. This work describes the currently used OGSE. Calibration tests provide an objective evidence of the SIS performance, allowing the conversion of the electrical sensor output into accurate physical measurements (irradiance) with uncertainty bounds. Calibration results of the SIS on board of the Dust characterisation, Risk assessment, and Environment Analyzer on the Martian Surface (DREAMS) on board the ExoMars 2016 Schiaparelli module (EDM—entry and descent module) are also presented, as well as their error propagation. Theoretical precision and accuracy of the instrument are determined by these results. Two types of OGSE are used as a function of the pursued aim: calibration OGSEs and Optical Fast Verification (OFV) GSE. Calibration OGSEs consist of three setups which characterize with the highest possible accuracy, the responsivity, the angular response and the thermal behavior; OFV OGSE verify that the performance of the sensor is close to nominal after every environmental and qualification test. Results show that the accuracy of the calibrated sensors is a function of the accuracy of the optical detectors and of the light conditions. For normal direct incidence and diffuse light, the accuracy is in the same order of uncertainty as that of the reference cell used for fixing the irradiance, which is about 1%.

  9. Agriculture on Mars: Soils for Plant Growth

    NASA Technical Reports Server (NTRS)

    Ming, D. W.

    2016-01-01

    Robotic rovers and landers have enabled the mineralogical, chemical, and physical characterization of loose, unconsolidated materials on the surface of Mars. Planetary scientists refer to the regolith material as "soil." NASA is currently planning to send humans to Mars in the mid 2030s. Early missions may rely on the use of onsite resources to enable exploration and self-sufficient outposts on Mars. The martian "soil" and surface environment contain all essential plant growth elements. The study of martian surface materials and how they might react as agricultural soils opens a new frontier for researchers in the soil science community. Other potential applications for surface "soils" include (i) sources for extraction of essential plant-growth nutrients, (ii) sources of O2, H2, CO2, and H2O, (iii) substrates for microbial populations in the degradation of wastes, and (iv) shielding materials surrounding outpost structures to protect humans, plants, and microorganisms from radiation. There are many challenges that will have to be addressed by soil scientists prior to human exploration over the next two decades.

  10. GRAM Series of Atmospheric Models for Aeroentry and Aeroassist

    NASA Technical Reports Server (NTRS)

    Duvall, Aleta; Justus, C. G.; Keller, Vernon W.

    2005-01-01

    The eight destinations in the Solar System with sufficient atmosphere for either aeroentry or aeroassist, including aerocapture, are: Venus, Earth, Mars, Jupiter, Saturn; Uranus. and Neptune, and Saturn's moon Titan. Engineering-level atmospheric models for four of these (Earth, Mars, Titan, and Neptune) have been developed for use in NASA's systems analysis studies of aerocapture applications in potential future missions. Work has recently commenced on development of a similar atmospheric model for Venus. This series of MSFC-sponsored models is identified as the Global Reference Atmosphere Model (GRAM) series. An important capability of all of the models in the GRAM series is their ability to simulate quasi-random perturbations for Monte Carlo analyses in developing guidance, navigation and control algorithms, and for thermal systems design. Example applications for Earth aeroentry and Mars aerocapture systems analysis studies are presented and illustrated. Current and planned updates to the Earth and Mars atmospheric models, in support of NASA's new exploration vision, are also presented.

  11. The Effect of a Mars Mission on Chromosome Damage in the Blood Lymphocytes of Astronauts

    NASA Technical Reports Server (NTRS)

    George, Kerry A.; Durante, M.; Cucinnotta, F. A.

    2006-01-01

    The radiation environment encountered during a manned mission to Mars will lead to significant elevation of biological damage in astronauts. Here we present estimates of the increased frequencies of chromosome aberrations in the peripheral blood lymphocytes of astronauts after a hypothetical Mars mission using radiation dose estimations and lymphocyte biology. Results will incorporate previously published data on in vivo induced chromosome damage in the blood lymphocytes of crewmembers after ISS and Mir missions, along with recent findings on the time dependant decay of chromosome aberrations after space flight.

  12. The Collaborative Information Portal and NASA's Mars Exploration Rover Mission

    NASA Technical Reports Server (NTRS)

    Mak, Ronald; Walton, Joan

    2005-01-01

    The Collaborative Information Portal was enterprise software developed jointly by the NASA Ames Research Center and the Jet Propulsion Laboratory for NASA's Mars Exploration Rover mission. Mission managers, engineers, scientists, and researchers used this Internet application to view current staffing and event schedules, download data and image files generated by the rovers, receive broadcast messages, and get accurate times in various Mars and Earth time zones. This article describes the features, architecture, and implementation of this software, and concludes with lessons we learned from its deployment and a look towards future missions.

  13. Mars-GRAM Applications for Mars Science Laboratory Mission Site Selection Processes

    NASA Technical Reports Server (NTRS)

    Justh, Hilary; Justus, C. G.

    2007-01-01

    An overview is presented of the Mars-Global Reference Atmospheric Model (Mars-GRAM 2005) and its new features. One important new feature is the "auxiliary profile" option, whereby a simple input file is used to replace mean atmospheric values from Mars-GRAM's conventional (General Circulation Model) climatology. An auxiliary profile can be generated from any source of data or alternate model output. Results are presented using auxiliary profiles produced from mesoscale model output (Southwest Research Institute's Mars Regional Atmospheric Modeling System (MRAMS) model and Oregon State University's Mars mesoscale model (MMM5) model) for three candidate Mars Science Laboratory (MSL) landing sites (Terby Crater, Melas Chasma, and Gale Crater). A global Thermal Emission Spectrometer (TES) database has also been generated for purposes of making 'Mars-GRAM auxiliary profiles. This data base contains averages and standard deviations of temperature, density, and thermal wind components, averaged over 5-by-5 degree latitude bins and 15 degree L(sub S) bins, for each of three Mars years of TES nadir data. Comparisons show reasonably good consistency between Mars-GRAM with low dust optical depth and both TES observed and mesoscale model simulated density at the three study sites. Mean winds differ by a more significant degree. Comparisons of mesoscale and TES standard deviations' with conventional Mars-GRAM values, show that Mars-GRAM density perturbations are somewhat conservative (larger than observed variability), while mesoscale-modeled wind variations are larger than Mars-GRAM model estimates. Input parameters rpscale (for density perturbations) and rwscale (for wind perturbations) can be used to "recalibrate" Mars-GRAM perturbation magnitudes to better replicate observed or mesoscale model variability.

  14. Mars Analog Rio Tinto Experiment (MARTE): An Experimental Demonstration of Key Technologies for Searching for Life on Mars

    NASA Technical Reports Server (NTRS)

    Stoker, Carol

    2004-01-01

    The discovery of near surface ground ice by the Mars Odyssey mission and the abundant evidence for recent Gulley features observed by the Mars Global Surveyor mission support longstanding theoretical arguments for subsurface liquid water on Mars. Thus, implementing the Mars program goal to search for life points to drilling on Mars to reach liquid water, collecting samples and analyzing them with instrumentation to detect in situ organisms and biomarker compounds. Searching for life in the subsurface of Mars will require drilling, sample extraction and handling, and new technologies to find and identify biomarker compounds and search for living organisms.

  15. Mars Mission Surface Operation Simulation Testing of Lithium-Ion Batteries

    NASA Technical Reports Server (NTRS)

    Smart, M. C.; Bugga, R.; Whitcanack, L. D.; Chin, K. B.; Davies, E. D.; Surampudi, S.

    2003-01-01

    The objectives of this program are to 1) Assess viability of using lithium-ion technology for future NASA applications, with emphasis upon Mars landers and rovers which will operate on the planetary surface; 2) Support the JPL 2003 Mars Exploration Rover program to assist in the delivery and testing of a 8 AHr Lithium-Ion battery (Lithion/Yardney) which will power the rover; 3) Demonstrate applicability of using lithium-ion technologyfor future Mars applications: Mars 09 Science Laboratory (Smart Lander) and Future Mars Surface Operations (General). Mission simulation testing was carried out for cells and batteries on the Mars Surveyor 2001 Lander and the 2003 Mars Exploration Rover.

  16. Lowest cost, nearest term options for a manned Mars mission

    NASA Technical Reports Server (NTRS)

    Sauls, Bob; Mortensen, Michael; Myers, Renee; Guacci, Giovanni; Montes, Fred

    1992-01-01

    This study is part of a NASA/USRA Advanced Design Program project executed for the purpose of examining the requirements of a first manned Mars mission. The mission, classified as a split/sprint mission, has been designed for a crew of six with a total manned trip time of one year.

  17. MSR ESA Earth Return Orbiter Mission Design Trades

    NASA Astrophysics Data System (ADS)

    Sanchez Perez, J. M.; Varga, G. I.; Huesing, J.; Beyer, F.

    2018-04-01

    The paper describes the work performed at ESOC in support of the Mars Sample Return ESA Earth Return Orbiter definition studies by exploring the trajectory optimization and mission design trade spaces of Mars return missions using electric and chemical propulsion.

  18. The Potential Impact of Mars' Atmospheric Dust on Future Human Exploration of the Red Planet

    NASA Astrophysics Data System (ADS)

    Winterhalter, D.; Levine, J. S.; Kerschmann, R.; Beaty, D. W.; Carrier, B. L.; Ashley, J. W.

    2017-12-01

    With the increasing focus by NASA and other space agencies on a crewed mission to Mars in the 2039 time-frame, many Mars-specific environmental factors are now starting to be considered by NASA and other engineering teams. Learning from NASA's Apollo Missions to the Moon, where lunar dust turned out to be a significant challenge to mission and crew safety, attention is now turning to the dust in Mars' atmosphere and regolith. To start the process of identifying possible dust-caused challenges to the human presence on Mars, and thus aid early engineering and mission design efforts, the NASA Engineering and Safety Center (NESC) Robotic Spacecraft Technical Discipline Team organized and conducted a Workshop on the "Dust in Mars' Atmosphere and Its Impact on the Human Exploration of Mars", held at the Lunar and Planetary Institute (LPI), Houston, TX, June 13-15, 2017. The workshop addressed the following general areas: 1. What is known about Mars' dust in terms of its physical and chemical properties, its local and global abundance and composition, and its variability.2. What is the impact of Mars atmospheric dust on human health.3. What is the impact of Mars atmospheric dust on surface mechanical systems (e.g., spacesuits, habitats, mobility systems, etc.). We present the top priority issues identified in the workshop.

  19. Human Mars Ascent Configuration and Design Sensitivities

    NASA Technical Reports Server (NTRS)

    Polsgrove, Tara P.; Gernhardt, Mike; Collins, Tim; Martin, John

    2017-01-01

    Human missions to Mars may utilize several small cabins where crew members could live for days up to a couple of weeks. At the end of a Mars surface mission the Mars Ascent Vehicle (MAV) crew cabin would carry the crew to their destination in orbit in a matter of hours or days. Other small cabins in support of a Mars mission would include pressurized rovers that allow crew members to travel great distances from their primary habitat on Mars while unconstrained by time limits of typical EVAs. An orbital crew taxi could allow for exploration of the moons of Mars with minimum impact to the primary Earth-Mars transportation systems. A common crew cabin design that can perform in each of these applications is desired and could reduce the overall mission cost. However, for the MAV, the crew cabin size and mass can have a large impact on vehicle design and performance. The total ascent vehicle mass drives performance requirements for the Mars descent systems and the Earth to Mars transportation elements. Minimizing MAV mass is a priority and minimizing the crew cabin size and mass is one way to do that. This paper explores the benefits and impacts of using a common crew cabin design for the MAV. Results of a MAV configuration trade study will be presented along with mass and performance estimates for the selected design.

  20. From Mars to Media: The Phoenix Mars Mission and the Challenges of Real-Time, Multimedia Science Communication and Public Education

    NASA Astrophysics Data System (ADS)

    Buxner, S.; Bitter, C.

    2008-12-01

    Although the Mars Exploration Rovers, Mars Reconnaissance Orbiter, and Mars Odyssey Missions set the standard for science communication and public education about Mars, the Phoenix Mission was presented with robust new communication challenges and opportunities. The new frontier includes Web 2.0, international forums, internal and external blogs, social networking sites, as well as the traditional media and education outlets for communicating science and information. We will explore the highlights and difficulties of managing the 'message from Mars' in our current multimedia saturated world while balancing authentic science discoveries, public expectations, and communication demands. Our goal is to create a more science savvy public and a more communication oriented science community for the future. The key issues are helping the public and our scientists distinguish between information and knowledge and managing the content that connects the two.

  1. Electrical power systems for Mars

    NASA Technical Reports Server (NTRS)

    Giudici, Robert J.

    1986-01-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  2. Electrical power systems for Mars

    NASA Astrophysics Data System (ADS)

    Giudici, Robert J.

    1986-05-01

    Electrical power system options for Mars Manned Modules and Mars Surface Bases were evaluated for both near-term and advanced performance potential. The power system options investigated for the Mission Modules include photovoltaics, solar thermal, nuclear reactor, and isotope power systems. Options discussed for Mars Bases include the above options with the addition of a brief discussion of open loop energy conversion of Mars resources, including utilization of wind, subsurface thermal gradients, and super oxides. Electrical power requirements for Mission Modules were estimated for three basic approaches: as a function of crew size; as a function of electric propulsion; and as a function of transmission of power from an orbiter to the surface of Mars via laser or radio frequency. Mars Base power requirements were assumed to be determined by production facilities that make resources available for follow-on missions leading to the establishment of a permanently manned Base. Requirements include the production of buffer gas and propellant production plants.

  3. Affordable Precursor Missions to Search for Life and Pave the Way for Human Exploration of Mars

    NASA Astrophysics Data System (ADS)

    Stoker, C. R.

    2017-02-01

    The goal of landing humans on Mars in the 2030s requires a precursor program to assess modern life on Mars and assess the water resource of near surface ground ice. Missions that address these issues are presented.

  4. Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

    NASA Technical Reports Server (NTRS)

    Borowski, Stanley K.; McCurdy, David R.; Packard, Thomas W.

    2014-01-01

    The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

  5. System-level Analysis of Food Moisture Content Requirements for the Mars Dual Lander Transit Mission

    NASA Technical Reports Server (NTRS)

    Levri, Julie A.; Perchonok, Michele H.

    2004-01-01

    In order to ensure that adequate water resources are available during a mission, any net water loss from the habitat must be balanced with an equivalent amount of required makeup water. Makeup water may come from a variety of sources, including water in shipped tanks, water stored in prepackaged food, product water from fuel cells, and in-situ water resources. This paper specifically addresses the issue of storing required makeup water in prepackaged food versus storing the water in shipped tanks for the Mars Dual Lander Transit Mission, one of the Advanced Life Support Reference Missions. In this paper, water mass balances have been performed for the Dual Lander Transit Mission, to determine the necessary requirement of makeup water under nominal operation (i.e. no consideration of contingency needs), on a daily basis. Contingency issues are briefly discussed with respect to impacts on makeup water storage (shipped tanks versus storage in prepackaged food). The Dual Lander Transit Mission was selected for study because it has been considered by the Johnson Space Center Exploration Office in enough detail to define a reasonable set of scenario options for nominal system operation and contingencies. This study also illustrates the concept that there are multiple, reasonable life support system scenarios for any one particular mission. Thus, the need for a particular commodity can depend upon many variables in the system. In this study, we examine the need for makeup water as it depends upon the configuration of the rest of the life support system.

  6. Mission and Design Sensitivities for Human Mars Landers Using Hypersonic Inflatable Aerodynamic Decelerators

    NASA Technical Reports Server (NTRS)

    Polsgrove, Tara P.; Thomas, Herbert D.; Collins, Tim; Dwyer Cianciolo, Alicia; Samareh, Jamshid

    2017-01-01

    Landing humans on Mars is one of NASA's long term goals. The Evolvable Mars Campaign (EMC) is focused on evaluating architectural trade options to define the capabilities and elements needed for a sustainable human presence on the surface of Mars. The EMC study teams have considered a variety of in-space propulsion options and surface mission options. As we seek to better understand how these choices affect the performance of the lander, this work informs and influences requirements for transportation systems to deliver the landers to Mars and enable these missions. This paper presents the effects of mission and vehicle design options on lander mass and performance. Beginning with Earth launch, options include fairing size assumptions, co-manifesting other elements with the lander, and Earth-Moon vicinity operations. Capturing into Mars orbit using either aerocapture or propulsive capture is assessed. For entry, descent, and landing both storable as well as oxygen and methane propellant combinations are considered, engine thrust level is assessed, and sensitivity to landed payload mass is presented. This paper focuses on lander designs using the Hypersonic Inflatable Aerodynamic Decelerators (HIAD), one of several entry system technologies currently considered for human missions.

  7. Development of Carbon Dioxide Removal Systems for Advanced Exploration Systems 2015-2016

    NASA Technical Reports Server (NTRS)

    Knox, James C.; Coker, Robert; Howard, David; Peters, Warren; Watson, David; Cmarik, Gregory; Miller, Lee A.

    2016-01-01

    A long-term goal for NASA is to enable crewed missions to Mars: first to the vicinity of Mars, and then to the Mars surface. These missions present new challenges for all aspects of spacecraft design in comparison with the International Space Station, as resupply is unavailable in the transit phase, and early return is not possible. Additionally, mass, power, and volume must be minimized for all phases to reduce propulsion needs. Mass reduction is particularly crucial for Mars surface landing and liftoff due to the challenges inherent in these operations for even much smaller payloads. In this paper we describe current and planned developments in the area of carbon dioxide removal to support future crewed Mars missions. Activities are also described that apply to both the resolution of anomalies observed in the ISS CDRA and the design of life support systems for future missions.

  8. Development of Carbon Dioxide Removal Systems for Advanced Exploration Systems 2014-2015

    NASA Technical Reports Server (NTRS)

    Knox, James C.; Coker, Robert; Huff, Timothy L.; Gatens, Robyn; Miller, Lee A.; Stanley, Christine

    2015-01-01

    A long-term goal for NASA is to enable crewed missions to Mars: first to the vicinity of Mars, and then to the Mars surface. These missions present new challenges for all aspects of spacecraft design in comparison with the International Space Station, as resupply is unavailable in the transit phase, and early return is not possible. Additionally, mass, power, and volume must be minimized for all phases to reduce propulsion needs. Mass reduction is particularly crucial for Mars surface landing and liftoff due to the challenges inherent in these operations for even much smaller payloads. In this paper we describe current and planned developments in the area of carbon dioxide removal to support future crewed Mars missions. Activities are also described that apply to both the resolution of anomalies observed in the ISS CDRA and the design of life support systems for future missions.

  9. NASA Exploration Team (NExT) In-Space Transportation Overview

    NASA Technical Reports Server (NTRS)

    Drake, Bret G.; Cooke, Douglas R.; Kos, Larry D.; Brady, Hugh J. (Technical Monitor)

    2002-01-01

    This presentation provides an overview of NASA Exploration Team's (NEXT) vision of in-space transportation in the future. Hurdles facing in-space transportation include affordable power sources, crew health and safety, optimized robotic and human operations and space systems performance. Topics covered include: exploration of Earth's neighborhood, Earth's neighborhood architecture and elements, Mars mission trajectory options, delta-v variations, Mars mission duration options, Mars mission architecture, nuclear electric propulsion advantages and miscellaneous technology needs.

  10. Space transfer concepts and analysis for exploration missions

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The progress and results are summarized for mission/system requirements database; mission analysis; GN and C (Guidance, Navigation, and Control), aeroheating, Mars landing; radiation protection; aerobrake mass analysis; Shuttle-Z, TMIS (Trans-Mars Injection Stage); Long Duration Habitat Trade Study; evolutionary lunar and Mars options; NTR (Nuclear Thermal Rocket); NEP (Nuclear Electric Propulsion) update; SEP (Solar Electric Propulsion) update; orbital and space-based requirements; technology; piloted rover; programmatic task; and evolutionary and innovative architecture.

  11. Development of Carbon Dioxide Removal Systems for Advanced Exploration Systems 2016-2017

    NASA Technical Reports Server (NTRS)

    Knox, James C.; Peters, Warren; Cmarik, Gregory E.; Watson, David; Coker, Robert; Miller, Lee

    2017-01-01

    A long-term goal for NASA is to enable crewed missions to Mars: first to the vicinity of Mars, and then to the Mars surface. These missions present new challenges for all aspects of spacecraft design in comparison with the International Space Station, as resupply is unavailable in the transit phase, and early return is not possible. Additionally, mass, power, and volume must be minimized for all phases to reduce propulsion needs. In this paper we describe current and planned developments in the area of carbon dioxide removal to support future crewed Mars missions. Activities are also described that apply to both the resolution of anomalies observed in the ISS CDRA and the design of life support systems for future missions.

  12. Acetylene fuel from atmospheric CO2 on Mars

    NASA Technical Reports Server (NTRS)

    Landis, Geoffrey A.; Linne, Diane L.

    1992-01-01

    The Mars mission scenario proposed by Baker and Zubrin (1990) intended for an unmanned preliminary mission is extended to maximize the total impulse of fuel produced with a minimum mass of hydrogen from Earth. The hydrogen along with atmospheric carbon dioxide is processed into methane and oxygen by the exothermic reaction in an atmospheric processing module. Use of simple chemical reactions to produce acetylene/oxygen rocket fuel on Mars from hydrogen makes it possible to produce an amount of fuel that is nearly 100 times the mass of hydrogen brought from earth. If such a process produces the return propellant for a manned Mars mission, the required mission mass in LEO is significantly reduced over a system using all earth-derived propellants.

  13. Why send humans to Mars?

    NASA Technical Reports Server (NTRS)

    Sagan, Carl

    1991-01-01

    The proposed Space Exploration Initiative (SDI) to launch a manned flight to Mars is examined in the current light of growing constraints in costs and other human requirements. Sharing the huge costs of such a program among a group of nations might become low enough for the project to be feasible. Robotic missions, equipped with enhanced artificial intelligence, appear to be capable of satisfying mission requirements at 10 percent or less, of the cost of a manned flight. Various additional pros and cons are discussed regarding both SDI generally and a Mars mission. It is suggested that R&D projects be pursued that can be better justified and can also contribute to human mission to Mars if eventually a decision to go is made.

  14. Mars MetNet Mission - Martian Atmospheric Observational Post Network

    NASA Astrophysics Data System (ADS)

    Harri, A.-M.; Haukka, H.; Aleksashkin, S.; Arruego, I.; Schmidt, W.; Genzer, M.; Vazquez, L.; Siikonen, T.; Palin, M.

    2017-09-01

    A new kind of planetary exploration mission for Mars is under development in collaboration between the Finnish Meteorological Institute (FMI), Lavochkin Association (LA), Space Research Institute (IKI) and Institutio Nacional de Tecnica Aerospacial (INTA). The Mars MetNet mission is based on a new semi-hard landing vehicle called MetNet Lander (MNL). The scientific payload of the Mars MetNet Precursor [1] mission is divided into three categories: Atmospheric instruments, Optical devices and Composition and structure devices. Each of the payload instruments will provide significant insights in to the Martian atmospheric behavior. The key technologies of the MetNet Lander have been qualified and the electrical qualification model (EQM) of the payload bay has been built and successfully tested.

  15. Astrobiological aspects of Mars and human presence: pros and cons.

    PubMed

    Horneck, G

    2008-08-01

    After the realization of the International Space Station, human exploratory missions to Moon or Mars, i.e. beyond low Earth orbit, are widely considered as the next logical step of peaceful cooperation in space on a global scale. Besides the human desire to extend the window of habitability, human exploratory missions are driven by several aspects of science, technology, culture and economy. Mars is currently considered as a major target in the search for life beyond the Earth. Understanding the history of water on Mars appears to be one of the clues to the puzzle on the probability of life on Mars. On Earth microorganisms have flourished for more than 3.5 Ga and have developed strategies to cope with so-called extreme conditions (e.g., hot vents, permafrost, subsurface regions, rocks or salt crystals). Therefore, in search for life on Mars, microorganisms are the most likely candidates for a putative biota on Mars and the search for morphological or chemical signatures of life or its relics is one of the primary and most exciting goals of Mars exploration. The presence of humans on the surface of Mars will substantially increase this research potential, e.g., by supporting deep subsurface drilling and by allowing intellectual collection and sophisticated in situ analysis of samples of astrobiological interest. On the other hand, such long-duration missions beyond LEO will add a new dimension to human space flight, concerning the distance of travel, the radiation environment, the gravity levels, the duration of the mission, and the level of confinement and isolation the crew will be exposed to. This will raise the significance of several health issues, above all radiation protection, gravity related effects as well as psychological issues. Furthermore, the import of internal and external microorganisms inevitably accompanying any human mission to Mars, or brought purposely to Mars as part of a bioregenerative life support system needs careful consideration with regard to planetary protection issues. Therefore, before planning any human exploratory mission, the critical issues concerning human health and wellbeing as well as protection of Mars in its pristine condition need to be investigated.

  16. Astrobiological Aspects of Mars and Human Presence: Pros and Cons

    PubMed Central

    Horneck, G

    2008-01-01

    After the realization of the International Space Station, human exploratory missions to Moon or Mars, i.e. beyond low Earth orbit, are widely considered as the next logical step of peaceful cooperation in space on a global scale. Besides the human desire to extend the window of habitability, human exploratory missions are driven by several aspects of science, technology, culture and economy. Mars is currently considered as a major target in the search for life beyond the Earth. Understanding the history of water on Mars appears to be one of the clues to the puzzle on the probability of life on Mars. On Earth microorganisms have flourished for more than 3.5 Ga and have developed strategies to cope with so-called extreme conditions (e.g., hot vents, permafrost, subsurface regions, rocks or salt crystals). Therefore, in search for life on Mars, microorganisms are the most likely candidates for a putative biota on Mars and the search for morphological or chemical signatures of life or its relics is one of the primary and most exciting goals of Mars exploration. The presence of humans on the surface of Mars will substantially increase this research potential, e.g., by supporting deep subsurface drilling and by allowing intellectual collection and sophisticated in situ analysis of samples of astrobiological interest. On the other hand, such long-duration missions beyond LEO will add a new dimension to human space flight, concerning the distance of travel, the radiation environment, the gravity levels, the duration of the mission, and the level of confinement and isolation the crew will be exposed to. This will raise the significance of several health issues, above all radiation protection, gravity related effects as well as psychological issues. Furthermore, the import of internal and external microorganisms inevitably accompanying any human mission to Mars, or brought purposely to Mars as part of a bioregenerative life support system needs careful consideration with regard to planetary protection issues. Therefore, before planning any human exploratory mission, the critical issues concerning human health and wellbeing as well as protection of Mars in its pristine condition need to be investigated. PMID:19048093

  17. Mars Science Laboratory Cruise Propulsion Maneuvering Operations

    NASA Technical Reports Server (NTRS)

    Baker, Raymond S.; Mizukami, Masahi; Barber, Todd J.

    2013-01-01

    Mars Science Laboratory "Curiosity" is NASA's most recent mission to Mars, launched in November 2011, and landed in August 2012. It is a subcompact car-sized nuclear powered rover designed for a long duration mission, with an extensive suite of science instruments. Entry, descent and landing used a unique "skycrane" concept. This report describes the propulsive maneuvering operations during cruise from Earth to Mars, to control attitudes and to target the vehicle for entry. The propulsion subsystem, mission operations, and flight performance are discussed. All trajectory control maneuvers were well within accuracy requirements, and all turns and spin corrections were nominal.

  18. 2001 Mars Odyssey Project report

    NASA Technical Reports Server (NTRS)

    Spencer, D. A.; Gibbs, R. G.; Mase, R. A.; Plaut, J. J.; Saunders, R. S.

    2002-01-01

    The Mars Odyssey orbiter was launched on April 7, 2001, and arrived at Mars on October 24, 2001. The orbiter carries scientific instruments that will determine surface elemental composition, mineralogy and morphology, and measure the Mars radiation environment from orbit. In addition, the orbiter will serve as a data relay for future surface missions. This paper will present an overview of the Odyssey project, including the key elements of the spacecraft design, mission design and navigation, mission operations, and the science approach. The project's risk management process will be described. Initial findings of the science team will be summarized.

  19. Bird's Eye View of Mars

    NASA Technical Reports Server (NTRS)

    2004-01-01

    This artist's concept shows NASA's future Mars Reconnaissance Orbiter mission over the red planet.

    NASA plans to launch this multipurpose spacecraft in August 2005 to advance our understanding of Mars through detailed observation, to examine potential landing sites for future surface missions and to provide a high-data-rate communications relay for those missions.

    The orbiter's shallow radar experiment, one of six science instruments on board, is designed to probe the internal structure of Mars' polar ice caps, as well as to gather information planet-wide about underground layers of ice, rock and, perhaps, liquid water, which might be accessible from the surface.

  20. Mars Network: Strategies for Deploying Enabling Telecommunications Capabilities in Support of Mars Exploration

    NASA Technical Reports Server (NTRS)

    Edwards, C. D.; Adams, J. T.; Agre, J. R.; Bell, D. J.; Clare, L. P.; Durning, J. F.; Ely, T. A.; Hemmati, H.; Leung, R. Y.; McGraw, C. A.

    2000-01-01

    The coming decade of Mars exploration will involve a diverse set of robotic science missions, including in situ and sample return investigations, and ultimately moving towards sustained robotic presence on the Martian surface. In supporting this mission set, NASA must establish a robust telecommunications architecture that meets the specific science needs of near-term missions while enabling new methods of future exploration. This paper will assess the anticipated telecommunications needs of future Mars exploration, examine specific options for deploying capabilities, and quantify the performance of these options in terms of key figures of merit.

  1. Planning Mars Memory: Learning from the MER Mission

    NASA Technical Reports Server (NTRS)

    Charlotte, Linde

    2004-01-01

    This viewgraph presentation discusses ways in which the lessons learned from a mission can be systematically remembered, retained, and applied by individuals and by an organization as a whole. The presentation cites lessons learned from the Mars Exploration Rover (MER) Mission as examples.

  2. Ice Dragon: A Mission to Address Science and Human Exploration Objectives on Mars

    NASA Technical Reports Server (NTRS)

    Stoker, Carol R.; Davila, A.; Sanders, G.; Glass, Brian; Gonzales, A.; Heldmann, Jennifer; Karcz, J.; Lemke, L.; Sanders, G.

    2012-01-01

    We present a mission concept where a SpaceX Dragon capsule lands a payload on Mars that samples ground ice to search for evidence of life, assess hazards to future human missions, and demonstrate use of Martian resources.

  3. Ice Dragon: A Mission to Address Science and Human Exploration Objectives on Mars

    NASA Astrophysics Data System (ADS)

    Stoker, C.; Davilla, A.; Davis, S.; Glass, B.; Gonzales, A.; Heldmann, J.; Karcz, J.; Lemke, L.; Sanders, G.

    2012-06-01

    We present a mission concept where a SpaceX Dragon capsule lands a payload on Mars that samples ground ice to search for evidence of life, assess hazards to future human missions, and demonstrate use of Martian resources.

  4. A Water Rich Mars Surface Mission Scenario

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.; Andrews, Alida; Joosten, B. Kent; Watts, Kevin

    2017-01-01

    In an on-going effort to make human Mars missions more affordable and sustainable, NASA continues to investigate the innovative leveraging of technological advances in conjunction with the use of accessible Martian resources directly applicable to these missions. One of the resources with the broadest utility for human missions is water. Many past studies of human Mars missions assumed a complete lack of water derivable from local sources. However, recent advances in our understanding of the Martian environment provides growing evidence that Mars may be more "water rich" than previously suspected. This is based on data indicating that substantial quantities of water are mixed with surface regolith, bound in minerals located at or near the surface, and buried in large glacier-like forms. This paper describes an assessment of what could be done in a "water rich" human Mars mission scenario. A description of what is meant by "water rich" in this context is provided, including a quantification of the water that would be used by crews in this scenario. The different types of potential feedstock that could be used to generate these quantities of water are described, drawing on the most recently available assessments of data being returned from Mars. This paper specifically focuses on sources that appear to be buried quantities of water ice. (An assessment of other potential feedstock materials is documented in another paper.) Technologies and processes currently used in terrestrial Polar Regions are reviewed. One process with a long history of use on Earth and with potential application on Mars - the Rodriguez Well - is described and results of an analysis simulating the performance of such a well on Mars are presented. These results indicate that a Rodriguez Well capable of producing the quantities of water identified for a "water rich" human mission are within the capabilities assumed to be available on the Martian surface, as envisioned in other comparable Evolvable Mars Campaign assessments. The paper concludes by capturing additional findings and describing additional simulations and tests that should be conducted to better characterize the performance of the identified terrestrial technologies for accessing subsurface ice, as well as the Rodriguez Well, under Mars environmental conditions.

  5. A Water Rich Mars Surface Mission Scenario

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.; Andrews, Alida; Joosten, B. Kent; Watts, Kevin

    2017-01-01

    In an on-going effort to make human Mars missions more affordable and sustainable, NASA continues to investigate the innovative leveraging of technological advances in conjunction with the use of accessible Martian resources directly applicable to these missions. One of the resources with the broadest utility for human missions is water. Many past studies of human Mars missions assumed a complete lack of water derivable from local sources. However, recent advances in our understanding of the Martian environment provides growing evidence that Mars may be more "water rich" than previously suspected. This is based on data indicating that substantial quantities of water are mixed with surface regolith, bound in minerals located at or near the surface, and buried in large glacier-like forms. This paper describes an assessment of what could be done in a "water rich" human Mars mission scenario. A description of what is meant by "water rich" in this context is provided, including a quantification of the water that would be used by crews in this scenario. The different types of potential feedstock that could be used to generate these quantities of water are described, drawing on the most recently available assessments of data being returned from Mars. This paper specifically focuses on sources that appear to be buried quantities of water ice. (An assessment of other potential feedstock materials is documented in another paper.) Technologies and processes currently used in terrestrial polar regions is reviewed. One process with a long history of use on Earth and with potential application on Mars - the Rodriguez Well - is described and results of an analysis simulating the performance of such a well on Mars are presented. These results indicate that a Rodriguez Well capable of producing the quantities of water identified for a "water rich" human mission are within the capabilities assumed to be available on the Martian surface, as envisioned in other comparable Evolvable Mars Campaign assessments. The paper concludes by capturing additional findings and describing additional simulations and tests that should be conducted to better characterize the performance of the identified terrestrial technologies for accessing subsurface ice, as well as the Rodriguez Well, under Mars environmental conditions.

  6. Multiple Smaller Missions as a Direct Pathway to Mars Sample Return

    NASA Technical Reports Server (NTRS)

    Niles, P. B.; Draper, D. S.; Evans, C. A.; Gibson, E. K.; Graham, L. D.; Jones, J. H.; Lederer, S. M.; Ming, D.; Seaman, C. H.; Archer, P. D.; hide

    2012-01-01

    Recent discoveries by the Mars Exploration Rovers, Mars Express, Mars Odyssey, and Mars Reconnaissance Orbiter spacecraft include multiple, tantalizing astrobiological targets representing both past and present environments on Mars. The most desirable path to Mars Sample Return (MSR) would be to collect and return samples from that site which provides the clearest examples of the variety of rock types considered a high priority for sample return (pristine igneous, sedimentary, and hydrothermal). Here we propose an MSR architecture in which the next steps (potentially launched in 2018) would entail a series of smaller missions, including caching, to multiple landing sites to verify the presence of high priority sample return targets through in situ analyses. This alternative architecture to one flagship-class sample caching mission to a single site would preserve a direct path to MSR as stipulated by the Planetary Decadal Survey, while permitting investigation of diverse deposit types and providing comparison of the site of returned samples to other aqueous environments on early Mars

  7. The 2009 Mars Telecommunications Orbiter

    NASA Technical Reports Server (NTRS)

    Wilson, G. R.; DePaula, R.; Diehl, R. E.; Edwards, C. D.; Fitzgerald, R. J.; Franklin, S. F.; Kerridge, S. A.; Komarek, T. A.; Noreen, G. K.

    2004-01-01

    The first spacecraft with a primary function of providing communication links while orbiting a foreign planet has begun development for a launch in 2009. NASA's Mars Telecommunications Orbiter would use three radio bands to magnify the benefits of other future Mars missions and enable some types of missions otherwise impractical. It would serve as the Mars hub for a growing interplanetary Internet. And it would pioneer the use of planet-to-planet laser communications to demonstrate the possibility for even greater networking capabilities in the future. With Mars Telecommunications Orbiter overhead in the martian sky, the Mars Science Laboratory rover scheduled to follow the orbiter to Mars by about a month could send to Earth more than 100 times as much data per day as it could otherwise send. The orbiter will be designed for the capability of relaying up to 15 gigabits per day from the rover, equivalent to more than three full compact discs each day. The same benefits would accrue to other future major Mars missions from any nation.

  8. Status of Liquid Oxygen/Liquid Methane Injector Study for a Mars Ascent Engine

    NASA Technical Reports Server (NTRS)

    Trinh, Huu Ogyic; Cramer, John M.

    1998-01-01

    Preliminary mission studies for human exploration of Mars have been performed at Marshall Space Flight Center (MSFC). These studies indicate that for non-toxic chemical rockets only a cryogenic propulsion system would provide high enough performance to be considered for a Mars ascent vehicle. Although the mission is possible with Earth-supplied propellants for this vehicle, utilization of in-situ propellants is highly attractive. This option would significantly reduce the overall mass of the return vehicle. Consequently, the cost of the mission would be greatly reduced because the number and size of the Earth launch vehicle(s) needed for the mission decrease. NASA/Johnson Space Center has initiated several concept studies (2) of in-situ propellant production plants. Liquid oxygen (LOX) is the primary candidate for an in-situ oxidizer. In-situ fuel candidates include methane (CH4), ethylene (C2H4), and methanol (CH3OH). MSFC initiated a technology development program for a cryogenic propulsion system for the Mars human exploration mission in 1998. One part of this technology program is the effort described here: an evaluation of propellant injection concepts for a LOX/liquid methane Mars Ascent Engine (MAE) with an emphasis on light-weight, high efficiency, reliability, and thermal compatibility. In addition to the main objective, hot-fire tests of the subject injectors will be used to test other key technologies including light-weight combustion chamber materials and advanced ignition concepts. This state-of-the-art technology will then be applied to the development of a cryogenic propulsion system that will meet the requirements of the planned Mars sample return (MSR) mission. The current baseline propulsion system for the MSR mission uses a storable propellant combination [monomethyl hydrazine/mixed oxides of nitrogen-25(MMH/MON-25)]. However, a mission option that incorporates in-situ propellant production and utilization for the ascent stage is being carefully considered as a subscale precursor to a future human mission to Mars.

  9. Mars-NEXT - A future step in the European exploration of Mars

    NASA Astrophysics Data System (ADS)

    Chicarro, Agustin

    The Mars-NEXT concept represents a new mission to Mars within the Aurora Exploration Programme of the European Space Agency (ESA). Mars-NEXT is planned after ExoMars and before the Mars Sample Return (MSR) and includes a number of landers to establish a network on the surface of Mars, to investigate the interior of the planet, its atmospheric dynamics and the geology of each landing site. The mission would be launched in 2016 onboard a Russian Soyuz rocket from Kourou. The Mars-NEXT mission includes a spacecraft carrying three (or four) lander probes to be released from an hyperbolic arrival trajectory to establish a Network of stations on the surface of Mars. The carrier spacecraft would be placed into orbit and carry a few instruments to complement the Network. Such network-orbiter combination represents a unique tool to perform new investigations of Mars which could not be addressed by other means. In particular, i) the internal geophysical aspects concern the structure and dynamics of the interior of Mars including the state of the core and composition of the mantle; the fine structure of the crust including its paleomagnetic anomalies; the rotational parameters (axis tilt, precession, nutation, etc) that define both the state of the interior and the climate evolution; ii) the atmospheric physics aspects concern the general circulation and its forcing factors; the time variability cycles of the transport of volatiles, water and dust; surface-atmosphere interactions and overall meteorology and climate; iii) the geology of each landing site concerns the full characterization of the surrounding area including petrological rock types, chemical and mineralogical sample analysis, erosion, oxidation and weathering processes to infer the geological history of the region. Characterization of the landing site area from a geosciences point of view requires a degree of mobility (instrument deployment device or robotic sampling arm). To complement the science gained from the Martian surface, investigations need to be carried out from orbit in a coordinated manner, such as i) global atmospheric mapping to study weather patterns and opacity; ii) accurate mapping of the planet's gravity field with a sub-satellite; iii) following Mars Global Surveyor's initial mapping of the crustal magnetic anomalies, a complete and detailed map from lower orbit (150 km) needs to be gathered; iv) also, these magnetic anomalies need to be studied in light of the magnetic field induced by the solar wind interaction with the upper atmosphere of the planet. The Network Mission concept is based on the fact that some important science goals on any given terrestrial planet can only be achieved with simultaneous measurements from a number of landers located on the surface of the planet (primarily internal geophysics and meteorology). The concept of a Network Mission on Mars is not new, and indeed previous studies support the great maturity of such a mission. A purely meteorological network would include as many stations as possible. For seismology, however, the number of stations (one to four) has a direct bearing on the scientific return achieved, four being the ultimate goal of the mission. The Geophysical Package (GEP) onboard ExoMars will allow to determine the level and frequency band of martian seismicity in order to calibrate the Mars-NEXT seismometers. Given the multiplicity of elements in the mission (landers, orbiter, science payload), numerous opportunities exist to share the efforts in an equitable way between ESA and other partners. The Mars-NEXT Mission is not only complementary to previous missions to Mars, including ExoMars, but is to be seen within the context of future astrobiological investigations of Mars, as we do not know which parameters did inhibit or favour the development of life on Earth. For instance, is plate tectonics a necessity, as well as an intrinsic magnetic field, a large orbiting moon, a thick atmosphere and a permanent ocean (to name a few) to preserve lifeforms on a terrestrial planet. Therefore, Mars-NEXT represents the logical step for Europe to undertake in the exploration of Mars, between ExoMars (2013 launch) and MSR (2020+ launch), providing unique science unavailable by other means.

  10. Mars-Next - a Future Step in the European Exploration of Mars

    NASA Astrophysics Data System (ADS)

    Chicarro, A. F.

    2008-09-01

    The Mars-NEXT concept represents a new mission to Mars within the Aurora Exploration Programme of the European Space Agency (ESA). Mars-NEXT is planned after ExoMars and before the Mars Sample Return (MSR) and includes a number of landers to establish a network on the surface of Mars, to investigate the interior of the planet, its atmospheric dynamics and the geology of each landing site. The mission would be launched in 2016 onboard a Russian Soyuz rocket from Kourou. The Mars-NEXT mission includes a spacecraft carrying three (or four) lander probes to be released from an hyperbolic arrival trajectory to establish a Network of stations on the surface of Mars. The carrier spacecraft would be placed into orbit and carry a few instruments to complement the Network. Such network-orbiter combination represents a unique tool to perform new investigations of Mars which could not be addressed by other means. In particular, i) the internal geophysical aspects concern the structure and dynamics of the interior of Mars including the state of the core and composition of the mantle; the fine structure of the crust including its paleomagnetic anomalies; the rotational parameters (axis tilt, precession, nutation, etc) that define both the state of the interior and the climate evolution; ii) the atmospheric physics aspects concern the general circulation and its forcing factors; the time variability cycles of the transport of volatiles, water and dust; surface-atmosphere interactions and overall meteorology and climate; iii) the geology of each landing site concerns the full characterization of the surrounding area including petrological rock types, chemical and mineralogical sample analysis, erosion, oxidation and weathering processes to infer the geological history of the region, as well as the astrobiological potential of each site. Characterization of the landing site area from a geosciences point of view requires a degree of mobility (instrument deployment device or robotic sampling arm). To complement the science gained from the Martian surface, investigations need to be carried out from orbit in a coordinated manner, such as i) global atmospheric mapping to study weather patterns and opacity; ii) accurate mapping of the planet's gravity field with a sub-satellite; iii) following Mars Global Surveyor's initial mapping of the crustal magnetic anomalies, a complete and detailed map from lower orbit (150 km) needs to be gathered; iv) also, these magnetic anomalies need to be studied in light of the magnetic field induced by the solar wind interaction with the upper atmosphere of the planet. The Network Mission concept is based on the fact that some important science goals on any given terrestrial planet can only be achieved with simultaneous measurements from a number of landers located on the surface of the planet (primarily internal geophysics and meteorology). The concept of a Network Mission on Mars is not new, and indeed previous studies support the great maturity of such a mission. A purely meteorological network would include as many stations as possible. For seismology, however, the number of stations (one to four) has a direct bearing on the scientific return achieved, four being the ultimate goal of the mission. The Geophysical Package (GEP) onboard ExoMars will allow to determine the level and frequency band of martian seismicity in order to calibrate the Mars- NEXT seismometers. Given the multiplicity of elements in the mission (landers, orbiter, science payload), numerous opportunities exist to share the efforts in an equitable way between ESA and other partners. The Mars-NEXT Mission is not only complementary to previous missions to Mars, including ExoMars, but is to be seen within the context of future astrobiological investigations of Mars, as we do not know which parameters did inhibit or favour the development of life on Earth. For instance, is plate tectonics a necessity, as well as an intrinsic magnetic field, a large orbiting moon, a thick atmosphere and a permanent ocean (to name a few) to preserve lifeforms on a terrestrial planet. Therefore, Mars-NEXT represents the logical step for Europe to undertake in the exploration of Mars, between ExoMars (2013 launch) and MSR (2020+ launch), providing unique science unavailable by other means.

  11. Mars-NEXT - A future major step in the European exploration of Mars

    NASA Astrophysics Data System (ADS)

    Chicarro, A.

    2009-04-01

    The Mars-NEXT concept represents a new mission to Mars within the Exploration Programme of the European Space Agency (ESA). Mars-NEXT is planned after ExoMars and before the Mars Sample Return (MSR) and includes a number of landers to establish a network on the surface of Mars, to investigate the interior of the planet, its atmospheric dynamics and the geology of each landing site. The mission would be launched in 2018 onboard a Russian Soyuz rocket from Kourou. The Mars-NEXT mission includes a spacecraft carrying three (or four) lander probes to be released from an hyperbolic arrival trajectory to establish a Network of stations on the surface of Mars. The carrier spacecraft would be placed into orbit and carry a few instruments to complement the Network. Such network-orbiter combination represents a unique tool to perform new investigations of Mars which could not be addressed by other means. In particular, i) the internal geophysical aspects concern the structure and dynamics of the interior of Mars including the state of the core and composition of the mantle; the fine structure of the crust including its paleomagnetic anomalies; the rotational parameters (axis tilt, precession, nutation, etc) that define both the state of the interior and the climate evolution; ii) the atmospheric physics aspects concern the general circulation and its forcing factors; the time variability cycles of the transport of volatiles, water and dust; surface-atmosphere interactions and overall meteorology and climate; iii) the geology of each landing site concerns the full characterization of the surrounding area including petrological rock types, chemical and mineralogical sample analysis, erosion, oxidation and weathering processes to infer the geological history of the region, as well as the astrobiological potential of each site. Characterization of the landing site area from a geosciences point of view requires a degree of mobility (instrument deployment device or robotic sampling arm). To complement the science gained from the Martian surface, investigations need to be carried out from orbit in a coordinated manner, such as i) global atmospheric mapping to study weather patterns and opacity; ii) accurate mapping of the planet's gravity field with a sub-satellite; iii) following Mars Global Surveyor's initial mapping of the crustal magnetic anomalies, a complete and detailed map from lower orbit (150 km) needs to be gathered; iv) also, these magnetic anomalies need to be studied in light of the magnetic field induced by the solar wind interaction with the upper atmosphere of the planet. The Network Mission concept is based on the fact that some important science goals on any given terrestrial planet can only be achieved with simultaneous measurements from a number of landers located on the surface of the planet (primarily internal geophysics and meteorology). The concept of a Network Mission on Mars is not new, and indeed previous studies support the great maturity of such a mission. A purely meteorological network would include as many stations as possible. For seismology, however, the number of stations (one to four) has a direct bearing on the scientific return achieved, four being the ultimate goal of the mission. The Geophysical Package (GEP) onboard ExoMars will allow to determine the level and frequency band of martian seismicity in order to calibrate the Mars-NEXT seismometers. Given the multiplicity of elements in the mission (landers, orbiter, science payload), numerous opportunities exist to share the efforts in an equitable way between ESA and other partners. The Mars-NEXT Mission is not only complementary to previous missions to Mars, including ExoMars, but is to be seen within the context of future astrobiological investigations of Mars, as we do not know which parameters did inhibit or favour the development of life on Earth. For instance, is plate tectonics a necessity, as well as an intrinsic magnetic field, a large orbiting moon, a thick atmosphere and a permanent ocean (to name a few) to preserve lifeforms on a terrestrial planet. Therefore, Mars-NEXT represents the logical step for Europe to undertake in the exploration of Mars, between ExoMars (2016 launch) and MSR (2020+ launch), providing unique science unavailable by other means.

  12. MMPM - Mission implementation of Mars MetNet Precursor

    NASA Astrophysics Data System (ADS)

    Harri, A.-M.

    2009-04-01

    We are developing a new kind of planetary exploration mission for Mars - MetNet in situ observation network based on a new semi-hard landing vehicle called the Met-Net Lander (MNL). The key technical aspects and solutions of the mission will be discussed. The eventual scope of the MetNet Mission is to deploy some 20 MNLs on the Martian surface using inflatable descent system structures, which will be supported by observations from the orbit around Mars. Currently we are working on the MetNet Mars Precursor Mission (MMPM) to deploy one MetNet Lander to Mars in the 2009/2011 launch window as a technology and science demonstration mission. The MNL will have a versatile science payload focused on the atmospheric science of Mars. Detailed characterization of the Martian atmospheric circulation patterns, boundary layer phenomena, and climatology cycles, require simultaneous in-situ measurements by a network of observation posts on the Martian surface. The scientific payload of the MetNet Mission encompasses separate instrument packages for the atmospheric entry and descent phase and for the surface operation phase. The MetNet mission concept and key probe technologies have been developed and the critical subsystems have been qualified to meet the Martian environmental and functional conditions. This development effort has been fulfilled in collaboration between the Finnish Meteorological Institute (FMI), the Russian Lavoschkin Association (LA) and the Russian Space Research Institute (IKI) since August 2001. Currently the INTA (Instituto Nacional de Técnica Aeroespacial) from Spain is also participating in the MetNet payload development.

  13. Proceedings of the Seventh International Conference on Mars

    NASA Technical Reports Server (NTRS)

    2007-01-01

    The oral and poster sessions of the SEVENTH INTERNATIONAL CONFERENCE ON MARS included; The Distribution and Context of Water-related Minerals on Mars; Poster Session: Mars Geology; Geology of the Martian Surface: Lithologic Variation, Composition, and Structure; Water Through Mars' Geologic History; Poster Session: Mars Water and the Martian Interior; Volatiles and Interior Evolution; The Martian Climate and Atmosphere: Variations in Time and Space; Poster Session: The Martian Climate and Current Processes; Modern Mars: Weather, Atmospheric Chemistry, Geologic Processes, and Water Cycle; Public Lecture: Mars Reconnaissance Orbiter's New View of the Red Planet; The North and South Polar Layered Deposits, Circumpolar Regions, and Changes with Time; Poster Session: Mars Polar Science, Astrobiology, Future Missions/Instruments, and Other Mars Science; Mars Astrobiology and Upcoming Missions; and Martian Stratigraphy and Sedimentology: Reading the Sedimentary Record.

  14. Science objectives of ESA's ExoMars mission

    NASA Astrophysics Data System (ADS)

    Vago, J. L.; Gardini, B.; Baglioni, P.; Kminek, G.; Gianfiglio, G.; Exomars Project Team

    ExoMars will deliver two science elements to the Martian surface: a Rover, carrying the Pasteur scientific payload; and a small, fixed surface station -the Geophysics & Environment Package (GEP). The ExoMars mission's scientific objectives are: 1) To search for signs of past and present life on Mars; 2) To characterise the water/geochemical environment as a function of depth in the shallow subsurface; 3) To study the surface environment and identify hazards to future human missions; and 4) To investigate the planet's deep interior to better understand Mars's evolution and habitability. Over its planned 6-month lifetime, the Rover will travel a few kilometres searching for traces of past and present signs of life. It will do this by collecting and analysing samples from within surface rocks, and from underground -down to 2-m depth. The very powerful combination of mobility with the capability to access locations where organic molecules may be well preserved is unique to this mission. The ExoMars mission contains two other elements: a Carrier and a Descent Module. The Carrier will bring the Descent Module to Mars and release it from the hyperbolic arrival trajectory. The Descent Module's objective is to safely deploy the Pasteur Rover and the GEP -developing a robust European Entry, Descent and Landing System (EDLS) is another fundamental goal of this mission. The mission's data relay capability will be provided by a NASA orbiter. The Pasteur Rover's mass is presently estimated at 190 kg, including the Pasteur scientific payload. The Pasteur payload contains: Panoramic Instruments: stereoscopic cameras, a ground-penetrating radar, and an IR spectrometer; Contact Instrument for studying surface rocks: a close-up imager and a Mössbauer spectrometer; a subsurface drill capable of reaching a depth of 2 m, and also of collecting specimens from exposed bedrock; a sample preparation and distribution unit; a microscope; an oxidation sensor; and a variety of analytical instruments for the characterisation of organic substances and geochemistry in the collected samples. Latitudinal bands between -15 deg and 45 deg can be targeted for landing, ensuring that the mission is flexible enough to accommodate interesting new sites based on latest available data from on-going Mars orbital missions.

  15. Using Mars and the Mer Mission to Teach Science: A Curriculum Designed for Teachers and Their Students

    NASA Astrophysics Data System (ADS)

    Aubele, J. C.; Stanley, J.; Grochowski, A.; Jones, K.; Aragon, J.

    2006-12-01

    Learning opportunities can be exceptionally successful when linked to national, newsworthy events. Planetary missions are particularly exciting in engaging teachers, and their students, because they combine the human "stories" of scientists and engineers with cutting-edge technology and new science. Planetary suface missions, such as the Mars Exploration Rover (MER) mission, return beautiful and human-scale images that can virtually transport the viewer to another world. The MER mission allows children and adults to participate in the exploration of one of our nearest neighbors in space. New discoveries in the natural history of Mars have been used as the basis of a new integrated curriculum created by Museum and class-room educators designed to serve informal (family learning) and formal (classroom) audiences. The curriculum uses Mars and the MER mission as a "hook" to teach a wide range of topics that relate to all of the sciences, mathematics, social studies (history and exploration), science and society, career readiness, language and literacy, and visual arts. The curriculum, entitled "Making Tracks on Mars: Teacher Resource and Activity Guide," includes the following key features that have contributed to its success and usefulness: (1) basic information about Mars, Mars missions, and the MER mission providing teachers with the knowledge they may lack; (2) activities that follow a standardized format and include necessary information, pre-lesson preparation and post-lesson closure and extensions, and all information and/or images needed; (3) activities that cross the curriculum and can be used to address many different standards; (4) relevant state and national standards listed for each activity; (5) annotated MER image file and PowerPoint presentation for easy classroom use; (6) lists of additional Mars-related resources; (7) emphasis on local connections to the mission to enable teachers and students to feel personally connected; (8) elementary through high school classroom teachers as co-authors and co-developers of the curriculum; (9) evaluation and assessement by "pilot program" teachers; and (10) collaboration and partnership with other local and regional science education providers, such as SCORE, which provided partial funding and dissemination support, and NM MESA, a statewide organization of teachers.

  16. MRSR: Rationale for a Mars Rover/Sample Return mission

    NASA Technical Reports Server (NTRS)

    Carr, Michael H.

    1992-01-01

    The Solar System Exploration Committee of the NASA Advisory Council has recommended that a Mars Rover/Sample Return mission be launched before the year 2000. The recommendation is consistent with the science objectives as outlined by the National Academy of Sciences committees on Planetary and Lunar Exploration, and Planetary Biology and Chemical Evolution. Interest has also focused on Mars Rover/Sample Return (MRSR) missions, because of their crucial role as precursors for human exploration. As a result of this consensus among the advisory groups, a study of an MRSR mission began early in 1987. The study has the following goals: (1) to assess the technical feasibility of the mission; (2) to converge on two or three options for the general architecture of the mission; (3) to determine what new technologies need to be developed in order to implement the mission; (4) to define the different options sufficiently well that preliminary cost estimates can be made; and (5) to better define the science requirements. This chapter briefly describes Mars Rover/Sample Return missions that were examined in the late 1980s. These missions generally include a large (1000 kg) rover and return of over 5 kg of sample.

  17. Environmental Monitoring as Part of Life Support for the Crew Habitat for Lunar and Mars Missions

    NASA Technical Reports Server (NTRS)

    Jan, Darrell L.

    2010-01-01

    Like other crewed space missions, future missions to the moon and Mars will have requirements for monitoring the chemical and microbial status of the crew habitat. Monitoring the crew habitat becomes more critical in such long term missions. This paper will describe the state of technology development for environmental monitoring of lunar lander and lunar outpost missions, and the state of plans for future missions.

  18. Interplanetary CubeSat for Technology Demonstration at Mars Artist Concept

    NASA Image and Video Library

    2015-06-12

    NASA's two MarCO CubeSats will be flying past Mars in September 2016 just as NASA's next Mars lander, InSight, is descending through the Martian atmosphere and landing on the surface. MarCO, for Mars Cube One, will provide an experimental communications relay to inform Earth quickly about the landing. This illustration depicts a moment during the lander's descent when it is transmitting data in the UHF radio band, and the twin MarCO craft are receiving those transmissions while simultaneously relaying the data to Earth in a different radio band. Each of the MarCO twins carries two solar panels for power, and both UHF-band and X-band radio antennas. As a technology demonstration, MarCO could lead to other "bring-your-own-relay" mission designs and also to use of miniature spacecraft for a wide diversity of interplanetary missions. MarCO is the first interplanetary use of CubeSat technologies for small spacecraft. CubeSats are a class of spacecraft based on a standardized small size and modular use of off-the-shelf technologies to streamline development. Many have been made by university students, and dozens have been launched into Earth orbit using extra payload mass available on launches of larger spacecraft. The two briefcase-size MarCO CubeSats will ride along with InSight on an Atlas V launch vehicle lifting off in March 2016 from Vandenberg Air Force Base, California. MarCO is a technology demonstration aspect of the InSight mission and not needed for that mission's success. InSight, an acronym for Interior Exploration using Seismic Investigations, Geodesy and Heat Transport, will investigate the deep interior of Mars to advance understanding of how rocky planets, including Earth, formed and evolved. After launch, the MarCO twins and InSight will be navigated separately to Mars. Note: After thorough examination, NASA managers have decided to suspend the planned March 2016 launch of the Interior Exploration using Seismic Investigations Geodesy and Heat Transport (InSight) mission. The decision follows unsuccessful attempts to repair a leak in a section of the prime instrument in the science payload. http://photojournal.jpl.nasa.gov/catalog/PIA19388

  19. Mars Pathfinder Microrover- Implementing a Low Cost Planetary Mission Experiment

    NASA Technical Reports Server (NTRS)

    Matijevic, J.

    1996-01-01

    The Mars Pathfinder Microrover Flight Experiment (MFEX) is a NASA Office of Space Access and Technology (OSAT) flight experiment which has been delivered and integrated with the Mars Pathfinder (MPF) lander and spacecraft system. The total cost of the MFEX mission, including all subsystem design and development, test, integration with the MPF lander and operations on Mars has been capped at $25 M??is paper discusses the process and the implementation scheme which has resulted in the development of this first Mars rover.

  20. A High Power Solar Electric Propulsion - Chemical Mission for Human Exploration of Mars

    NASA Technical Reports Server (NTRS)

    Burke, Laura M.; Martini, Michael C.; Oleson, Steven R.

    2014-01-01

    Recently Solar Electric Propulsion (SEP) as a main propulsion system has been investigated as an option to support manned space missions to near-Earth destinations for the NASA Gateway spacecraft. High efficiency SEP systems are able to reduce the amount of propellant long duration chemical missions require, ultimately reducing the required mass delivered to Low Earth Orbit (LEO) by a launch vehicle. However, for long duration interplanetary Mars missions, using SEP as the sole propulsion source alone may not be feasible due to the long trip times to reach and insert into the destination orbit. By combining an SEP propulsion system with a chemical propulsion system the mission is able to utilize the high-efficiency SEP for sustained vehicle acceleration and deceleration in heliocentric space and the chemical system for orbit insertion maneuvers and trans-earth injection, eliminating the need for long duration spirals. By capturing chemically instead of with low-thrust SEP, Mars stay time increases by nearly 200 days. Additionally, the size the of chemical propulsion system can be significantly reduced from that of a standard Mars mission because the SEP system greatly decreases the Mars arrival and departure hyperbolic excess velocities (V(sub infinity)).

Top